77 FR 29317 - Fiscal Year 2012 Draft Work Plan
2012-05-17
... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...
77 FR 29317 - Fiscal Year 2011 Draft Work Plan
2012-05-17
... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...
77 FR 17091 - Trust Land Consolidation Draft Plan
2012-03-23
... DEPARTMENT OF THE INTERIOR Office of the Secretary Trust Land Consolidation Draft Plan AGENCY... reopening the period for commenting on the Cobell Land Consolidation Program Draft Plan (also known as the Trust Land Consolidation Draft Plan), which is the draft plan for accomplishing these goals. DATES...
USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site
2011-10-06
...] Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas AGENCY: Fish... draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP will function as a... the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its range in Texas...
77 FR 5528 - Trust Land Consolidation Draft Plan
2012-02-03
... DEPARTMENT OF THE INTERIOR Office of the Secretary Trust Land Consolidation Draft Plan AGENCY... draft plan for accomplishing these goals. DATES: Submit comments by March 19, 2012. ADDRESSES: Send comments on the draft plan to: Elizabeth Appel, Bureau of Indian Affairs, 1001 Indian School Road NW...
Draft IAEA Action Plan on Nuclear Safety. Report by the Director General
International Nuclear Information System (INIS)
Amano, Y.
2011-01-01
In accordance with paragraphs 23 and 24 of the Declaration adopted by the Ministerial Conference on Nuclear Safety held on 20-24 June 2011, the Director General was requested to prepare and present to the Board of Governors and the General Conference at their September 2011 meetings a report on the Ministerial Conference and a draft Action Plan, building on the Ministerial Declaration, the conclusions and recommendations of the working sessions of the Ministerial Conference and the expertise and knowledge available therein, and to facilitate consultations among Member States on the draft Action Plan. This draft Action Plan is the result of an extensive process of consultations with Member States and responds to the request contained in the Ministerial Declaration.
Draft 1988 mission plan amendment
International Nuclear Information System (INIS)
1988-06-01
This draft 1988 amendment to the Mission Plan for the Civilian Radioactive Waste Management Program has been prepared by the US Department of Energy (DOE). The purpose is to inform the Congress of the DOE's plans for implementing the provisions of the Nuclear Waste Policy Amendments Act of 1987 (P.L. 100-203) for the Civilian Radioactive Waste Management Program. This document is being submitted in draft form to Federal agencies, states, previously affected Indian Tribes, affected units of local government, and the public. After the consideration of comments, this amendment will be revised as appropriate and submitted to the Congress. 39 refs., 7 figs., 4 tabs
International Nuclear Information System (INIS)
1994-06-01
Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization
78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan
2013-09-12
... DEPARTMENT OF VETERANS AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans... Affairs (VA) is announcing the availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan... Act of 2010 (GPRAMA) (Pub. L. 111-352). The Strategic Plan provides the Department's long-term...
78 FR 26616 - Draft NOAA Five Year Research and Development Plan
2013-05-07
... DEPARTMENT OF COMMERCE Draft NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development...
2011-09-23
... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...
Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices
International Nuclear Information System (INIS)
1995-02-01
This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS
Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1995-02-01
This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.
76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan
2011-10-04
...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...
12 CFR 516.20 - What information must I include in my draft business plan?
2010-01-01
... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
2013-04-02
... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http... through additional interpretive efforts, marketing, and facilities. Alternative C, the NPS preferred...
2011-09-16
... approximately 707,000 subsurface acres of Federal mineral estate. Decisions in the Colorado River Valley RMP... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River Valley Field Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability...
2011-04-22
...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...
The draft Mission Plan Amendment
International Nuclear Information System (INIS)
Gale, R.W.
1987-01-01
The draft Mission Plan Amendment provides an opportunity for States and Indian Tribes and other involved parties to participate in a process that no other nation affords its citizens. More than just a comment period on a Department of Energy document, the amendment that is to be submitted later this year will lay before Congress, the documentary basis on which to make decisions about the scope and timing of the high-level waste program in what Secretary Herrington has called a ''crossroads'' years. The Amendment will distill the view of the participants and also preset them to Congress as an integral part of the document. After four years of effort, the Nation is being afforded an opportunity to ask itself again whether the Act passed in 1982 is working and remains the best way to protect the public interest
76 FR 64327 - Office of Oceanic and Atmospheric Research Draft Strategic Plan
2011-10-18
...: 111003608-1608-01] Office of Oceanic and Atmospheric Research Draft Strategic Plan AGENCY: Office of Oceanic... notice announces that OAR's draft Strategic Plan (FY12- 18) is available for public review and comment... next six years. These goals and objectives will provide guidance and strategic direction for program...
2010-04-26
... DEPARTMENT OF THE INTERIOR National Park Service Coral Reef Restoration Plan, Draft Programmatic... Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National Environmental... availability of a Draft Programmatic Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan...
10 CFR 51.76 - Draft environmental impact statement-limited work authorization.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...
2012-06-29
... DEPARTMENT OF THE INTERIOR National Park Service [2310-0070-422] Winter Use Plan, Supplemental.... ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter... Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan for Yellowstone National Park...
2011-05-02
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-R-2010-N277; 40136-1265-0000-S3] Cabo Rojo National Wildlife Refuge, Cabo Rojo, Puerto Rico; Draft Comprehensive Conservation Plan and... draft comprehensive conservation plan and environmental assessment (Draft CCP/EA) for Cabo Rojo National...
2013-08-01
... Availability of the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity Fee Schedule for the Fort... the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity Fee Schedule. The Rob Jaggers... comments will be considered, the BLM must receive written comments on the Draft Business Plan by December...
2012-09-04
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMRO-YELL-11188; 2310-0070-422] Winter Use... comment period on the Draft Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan... online at http://parkplanning.nps.gov/YELL (click on the link to the 2012 Supplemental Winter Use Plan...
Draft Transportaion Business Plan
International Nuclear Information System (INIS)
1985-08-01
The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for establishing a transportation system to support shipment of spent fuel and high-level radioactive waste to repositories and storage facilities developed under the Nuclear Waste Policy Act of 1982 (NWPA). An element that assists in fulfilling that responsibility is a business plan for acquiring and operating a transportation system. The Draft Transportation Business Plan is an interim step in the process of procuring the transportation system. It sets the context for business strategy decisions by providing pertinent background information, describing the legislation and policies governing transportation under the NWPA, and with establishing the transportation system. It also serves as an instrument for initiating communication between OCRWM and other interested parties. Included in the docuument are strategies for procuring shipping casks and transportation support services. Additionally, in the spirit of the NWPA directive to utilize the private sector to the maximum extent possible, opportunities for business ventures are obvious throughout the system development cycle
2010-09-17
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYP07000; L16100000.DU0000] Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the Fortification Creek Planning Area... and maintaining other management activities in the planning area. The Draft RMPA/EA documents the...
2012-10-03
...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... of comments pertaining to the development of the Midwest Wind Energy Multi-Species Habitat..., intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation Plan (MSHCP) under the...
2012-08-30
...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... our planning partners, intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation... decommissioning of wind energy facilities within all or portions of the eight-State planning area. Activities...
Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1
International Nuclear Information System (INIS)
1994-01-01
This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan
76 FR 9529 - Migratory Birds; Draft Eagle Conservation Plan Guidance
2011-02-18
...-1231-9BPP] RIN 1018-AX53 Migratory Birds; Draft Eagle Conservation Plan Guidance AGENCY: Fish and... mail to: Attention: Eagle Conservation Plan Guidance; Division of Migratory Bird Management; U.S. Fish... implementing statutes including the Bald and Golden Eagle Protection Act (BGEPA), the Migratory Bird Treaty Act...
77 FR 31869 - Iris Lacustris (Dwarf Lake Iris); Draft Recovery Plan for Review and Comment
2012-05-30
...-FF03E00000] Iris Lacustris (Dwarf Lake Iris); Draft Recovery Plan for Review and Comment AGENCY: Fish and... Service (Service) announces availability for public review of the draft recovery plan for the Iris lacustris (dwarf lake iris), a species that is federally listed as threatened under the Endangered Species...
2010-01-13
... visitor experiences. Management actions would build upon the cultural resource, interpretive, and... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...
77 FR 8890 - Clarks River National Wildlife Refuge, KY; Draft Comprehensive Conservation Plan and...
2012-02-15
... boundaries would be based on importance of the habitat for target management species. We would offer....fws.gov planning under ``Draft Documents.'' Comments on the Draft CCP/EA may be submitted to the above..., advancement, management, conservation, and protection of fish and wildlife resources. Approximately 74 percent...
2011-01-26
... guides and transporters to maintain big game hunting opportunities while reducing social conflict in the...] Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife Refuge... period for the Revised Comprehensive Conservation Plan and Environmental Assessment for Selawik National...
International Nuclear Information System (INIS)
1988-01-01
The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs
2013-12-19
... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...
Prioritization of tasks in the draft LWR safety technology program plan. Final report
International Nuclear Information System (INIS)
Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.
1980-05-01
The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix
2011-04-25
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...
Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents
EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
2011-07-26
... Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact Statement AGENCY... availability of the Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact... resident Canada geese. Action is needed at this time to manage the restored wetlands at the Park. The Plan...
75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015
2010-07-09
... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...
Puget Sound area electric reliability plan: Draft Environmental Impact Statement
International Nuclear Information System (INIS)
1992-04-01
The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin
2012-12-26
...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm Springs Dace... revised recovery plan for the Kendall Warm Springs dace (Rhinichthys osculus thermalis). This species is... recovery plan. The Kendall Warm Springs dace (Rhinichthys osculus thermalis), found only in one location in...
77 FR 2514 - National Ocean Council-National Ocean Policy Draft Implementation Plan
2012-01-18
... Ocean Council developed actions to achieve the Policy's nine priority objectives, and to address some of..., contribute trillions of dollars a year to the national economy, and are essential to public health and... departments, agencies, and offices developed the actions in the draft Implementation Plan with significant...
2013-02-26
... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS....YP0000] Draft Environmental Impact Statement for General Management Plan, Everglades National Park... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National...
Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches
International Nuclear Information System (INIS)
1987-09-01
This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…
2013-01-28
...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...
2013-11-08
... focus on protecting natural resources and systems. Under this alternative, most of the Big Spring... Availability of the Draft General Management Plan/ Wilderness Study/Environmental Impact Statement for the... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic...
2011-05-27
... and Threatened Wildlife and Plants (List). Recovery plans help guide our recovery efforts by...] Endangered and Threatened Wildlife and Plants; Notice of Availability of a Draft Recovery Plan, First... plan, you may submit your comments in writing by any one of the following methods: U.S. mail: Field...
2010-09-17
...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog AGENCY: Fish... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... and peer reviewers in an appendix to the approved recovery plan. The Utah prairie dog (Cynomys...
2013-03-27
... and strategic process to cover the years 2013-2018, and responds to feedback from the National... administrations. Two cross-modal bodies participated in the process: the RD&T Planning Team Council (composed of...-0002] Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...
International Nuclear Information System (INIS)
1988-01-01
The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE's repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab
Knowledge co-production and boundary work to promote implementation of conservation plans.
Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda
2016-02-01
Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas
2013-12-06
... Environmental Impact Statement (Draft Phase III ERP/PEIS). The Draft Phase III ERP/PEIS considers programmatic... programmatic restoration alternatives. The Draft Phase III ERP/PEIS evaluates these restoration alternatives... the Framework Agreement. The Draft Phase III ERP/PEIS also evaluates the environmental consequences of...
Drafting method of electricity and electron design
International Nuclear Information System (INIS)
Gungbon, Junchun
1989-11-01
This book concentrates on drafting of electricity and electron design. It deals with The meaning of electricity and electron drafting JIS standard regulation the types of drafting and line and letter, basics drafting with projection drafting method, plan projection and development elevation, Drafting method of shop drawing, practical method of design and drafting, Design and drafting of technic and illustration, Connection diagram, Drafting of wiring diagram for light and illumination, Drafting of development connection diagram for sequence control, Drafting of logic circuit sign of flow chart and manual, drafting for a electron circuit diagram and Drawing of PC board.
2010-09-15
... on the MOCA network recommended in the 2008 Recovery Plan and will instead use the model results to... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N184; 10120-1113-0000-C2] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl...
International Nuclear Information System (INIS)
Wood, W.B.
1977-02-01
In this fourth part of the four-part TNS Draft Program Plan, project engineering concerns are considered. The TNS Project is first broken down into the major time and functional periods of feasibility study, preconceptual design, conceptual design, and line item construction, while the elements of the project are organized into an administrative work breakdown structure. With the aid of these two classifying schemes, the project tasks are described in terms of schedule, estimated cost, type of funding, and proposed type of participant. The initial constraints of completion data, anticipated scientific inputs, and budget procedures are used to develop a two-phase project in which the facilities are authorized first and the device 2 years later. This specific mechanism is fundamental to the construction of the schedule and should be reconsidered when the completion and initiation dates are reformulated
2010-05-26
...; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093560837). The Office of Nuclear Security...
2011-06-02
... for invasive introduced plant removal, as appropriate, and adaptive management plans to address... consider the species for reclassification or removal from the Federal List of Endangered and Threatened... hispida under the Endangered Species Act of 1973, as amended (Act). This draft plan is an addendum to the...
2010-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application... Tribe/Consortium in drafting its planning grant application? 1000.68 Section 1000.68 Indians OFFICE OF... planning grant application? Yes, upon request from the Tribe/Consortium, a non-BIA bureau may provide...
2013-05-03
.... Alternative 2, the NPS preferred alternative, would support a broad ecosystem approach for preserve management... management of cross-boundary resource issues and the importance of encouraging partnerships to address and... Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National...
Draft Site Treatment Plan (DSTP), Volumes I and II
International Nuclear Information System (INIS)
D'Amelio, J.
1994-01-01
Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state's input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only
2010-03-30
... Wildlife Service, announce the availability of the Draft Revised Recovery Plan for the Mariana Fruit Bat or... and assistance of a Recovery Team appointed by the U.S. Fish and Wildlife Service. Section 4(f) of the... life history and ecology, this recovery plan focuses on the first 10 years of the recovery process. As...
Region 3 - EPA is performing market research to determine if industry has the capability and capacity to perform the work, on a national level, as described in the attached draft Statement of Work /Performance Work Statement(SOW/PWS).
2013-04-05
.... Background The Fowler Ridge application is unusual in that 355 wind turbines are already in place and have... Agreement, and Draft Implementing Agreement; Application for an Incidental Take Permit, Fowler Ridge Wind... application from Fowler Ridge Wind Farm LLC, Fowler Ridge II Wind Farm LLC, Fowler Ridge III Wind Farm LLC...
2010-08-25
...: National Center for Complementary and Alternative Medicine Draft Strategic Plan ACTION: Notice. SUMMARY: The National Center for Complementary and Alternative Medicine (NCCAM) is developing its third... for Complementary and Alternative Medicine (NCCAM) was established in 1998 with the mission of...
EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
International Nuclear Information System (INIS)
1988-01-01
The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab
2012-06-13
... (ICCVAM) has developed a draft NICEATM-ICCVAM Five-Year Plan. The plan describes four core strategies to... innovations are driving transformative changes in toxicology and how safety testing is performed. The field of toxicology is evolving from a system based largely on animal testing toward one based on the integration of...
1992 Resource Program, 10 Year Plan : Draft II.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-05-01
The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.
1992 Resource Program, 10 Year Plan : Draft II.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-05-01
The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.
2012-12-14
... eliminated. A maximum of 7,500 summer and winter landings would be permitted in the project area annually... considered, the BLM must receive written comments on the Draft RMP Amendment/Draft EIS within 90 days... meetings or hearings and any other public involvement activities at least 15 days in advance through public...
Puget Sound area electric reliability plan. Draft environmental impact statement
Energy Technology Data Exchange (ETDEWEB)
1991-09-01
The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.
Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1991-09-01
The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.
System for implement draft reduction
DEFF Research Database (Denmark)
2008-01-01
Abstract of WO 2008095503 (A1) There is disclosed a system and method of reducing draft forces when working soil with agricultural soil working implements (206, 211) creating draft forces, the soil working implements (208, 206, 211) beingoperable connectable to a frame (204, 304, 404, 504, 604......, the second part of the width comprising an other part of said width (212) than the first part (222), so as e.g. to reduce draft forces compared to working both first and second parts at the same time....
2011-07-07
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-R-2011-N053; 40136-1265-0000-S3] St... conservation plan and environmental assessment (Draft CCP/EA) for St. Johns National Wildlife Refuge (NWR) in... Complex, P.O. Box 2683, Titusville, FL 32781, or via e-mail at [email protected] , or St. Johns CCP...
2013-02-08
... identifying and responding to the challenges that a changing climate poses to human health and the environment... fulfill its mission of protecting human health and the environment even as the climate changes. EPA...: Draft EPA Climate Change Adaptation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Notice...
Developing a Pilot Maritime Spatial Plan for the Pomeranian Bight and Arkona Basin
DEFF Research Database (Denmark)
Käppeler, Bettina; Toben, Susan; Chmura, Grazyna
2012-01-01
This report presents the result of a pilot project carried out as part of the EU-‐funded BaltSeaPlan project (2009-‐2011). A team of experts with diverse professional backgrounds worked over a period of two years to draft a pilot transboundary maritime spatial plan for a sea area in the Pomeran......This report presents the result of a pilot project carried out as part of the EU-‐funded BaltSeaPlan project (2009-‐2011). A team of experts with diverse professional backgrounds worked over a period of two years to draft a pilot transboundary maritime spatial plan for a sea area...... in the Pomeranian Bight/Arkona Basin. The draft spatial plan is the result of a planning exercise which took place outside the formal planning processes as legally binding agreements already exist for the German EEZ and the territorial waters of Mecklenburg-‐Vorpommern. Working with diverse stakeholders in Poland...... tangible output, the pilot project was also a test case of working with the MSP planning cycle across national borders, bringing together four different planning systems and traditions in the attempt to come to joint solutions in a sea area faced with multiple pressures. In line with the MSP planning cycle...
2010-08-25
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Draft National Conversation on Public Health and Chemical Exposures Work Group Reports; Opportunity for Public Comment AGENCY.../nationalconversation/work_groups.html . For additional information on the National Conversation on Public Health and...
International Nuclear Information System (INIS)
Hambley, D.F.; Mraz, D.Z.; Unterberter, R.R.
1987-01-01
This report documents the peer review conducted by Argonne National Laboratory of a document entitled ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared for Battelle Memorial Institute's Office of Nuclear Waste Isolation by Golder Associates, Inc. In general, the peer review panelists found the test plan to be technically sound, although some deficiencies were identified. Recommendations for improving the test plan are presented in this review report. A microfiche copy of the following unpublished report is attached to the inside back cover of this report: ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared by Golder Associates, Inc., for Office of Nuclear Waste Isolation, Battelle Memorial Institute, Columbus, Ohio (March 1985)
Brief Comment on the Draft Land Administration, Use, Registration ...
African Journals Online (AJOL)
D_Behailu
The draft 'Land Administration, Use, Registration and Plan Proclamation (2007. EC)' has been in circulation for a while now. One of the prime objectives of the draft law is to address various counterproductive restrictions in the current federal land proclamation. According to its preamble, the draft aspires to expand the rights ...
DER Certification Laboratory Pilot, Accreditation Plan, and Interconnection Agreement Handbook
Energy Technology Data Exchange (ETDEWEB)
Key, T.; Sitzlar, H. E.; Ferraro, R.
2003-11-01
This report describes the first steps toward creating the organization, procedures, plans and tools for distributed energy resources (DER) equipment certification, test laboratory accreditation, and interconnection agreements. It covers the activities and accomplishments during the first period of a multiyear effort. It summarizes steps taken to outline a certification plan to assist in the future development of an interim plan for certification and accreditation activities. It also summarizes work toward a draft plan for certification, a beta Web site to support communications and materials, and preliminary draft certification criteria.
2013-06-18
... draft recovery plan for the endangered golden sedge, a species endemic to the coastal plain in North... framework for the recovery of this species so that protection under the Act is no longer necessary. Golden... ``protected'' to mean the site has been fee simple acquired and put into long-term conservation by a local or...
International Nuclear Information System (INIS)
1988-01-01
As part of the process for siting the nation's first geologic repository for radioactive waste, the Department of Energy (DOE) is preparing a site characterization plan for the Hanford site in Benton County, Washington. As a step in the preparation of that plan, the DOE has provided, for information and review, a consultation draft of the plan to the State of Washington, the affected Indian Tribes - the Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Indian Tribe, and the Yakima Indian Nation - and the US Nuclear Regulatory Commission. The Hanford site is one of three sites that the DOE currently plans to characterize;the other sites are the Deaf Smith County site in Texas and the Yucca Mountain site in Nevada. After site characterization has been completed and its results evaluated, the DOE will identify from among the three characterized sites the site that is preferred for the repository. The overview presented here consists of brief summaries of important topics covered in the consulation draft of the site characterization plan;it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with breif descriptions of the dispoal system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Hanford site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization
International Nuclear Information System (INIS)
Meek, N.C.; Ingram, S.; Page, J.
2003-01-01
BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] → [Review project and conduct Characterisation review of power station] → [Identify work packages] → [Set up WBS to level 3] → [Assign work packages] → [Update WBS to level 4] →[Develop cost model] → [Develop logic network] → [Develop risk management procedure] ] → [Develop project strategy document]→ [Work package
2010-05-11
...] Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic... draft Environmental Planning and Historic Preservation Compliance Costs policy and a draft Environmental Planning and Historic Preservation Mitigation policy. DATES: Comments must be received by June 10, 2010...
Surface-based test plan, Deaf Smith County, Texas Site: Draft
International Nuclear Information System (INIS)
1985-01-01
The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure
Introduction to Production/Manufacturing Drafting. Drafting Module 8. Instructor's Guide.
Missouri Univ., Columbia. Instructional Materials Lab.
This module, 1 of 10 in the Drafting curriculum guide developed in Missouri, contains 3 units of study that include some or all of the following components: performance objectives, lesson plans, information sheets, transparency masters, handouts, assignment sheets, job sheets, a unit test, and answers to the unit test. Special instructions on…
International Nuclear Information System (INIS)
1991-06-01
Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE
Automatic drafting system for lined tanks used for nuclear power plants
International Nuclear Information System (INIS)
Sasaki, Ryoichi; Kikuchi, Nobuo
1981-01-01
The concrete vessels lined with metallic sheets are used widely in chemical and food industries and nuclear power plants. Especially in nuclear power plants, rectangular lined tanks have been adopted mainly to store radioactive liquid and solid wastes recently, because of the good volume efficiency. Though the basic structure of the lined tanks is the same, the volume and the form change according to the kinds of stored matters and the positions of pipe connections, and the form of individual lining sheets diversifies. As much labor and time are consumed for the drawing, automatic drafting was planned, and the conditions of application were studied. As for the conditions of application, the following metters are conceivable: the standardized method of design of equipments, the handling of figures numerically or by mathematical formulas, troublesome calculation, the works likely to cause mistake, many drawings for production and so on. The lined tanks almost satisfy these conditions, therefore the automatic drafting was promoted, and good results were obtained. the range of application of the automatic drafting system, the standardization of the form of lined tanks, the size of lining sheets, part number and welding number, the composition of the automatic drafting system, the outline of the program, and the effectiveness of automatic drafting are described. (Kako, I.)
DEFF Research Database (Denmark)
Eibe Sørensen, Hans
2018-01-01
Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...
Directory of Open Access Journals (Sweden)
F. Dall'Osso
2010-08-01
Full Text Available Australia is at risk from tsunamis and recent work has identified the need for models to assess the vulnerability of exposed coastal areas – a fundamental element of the risk management process. Outputs of vulnerability assessment can be used as a baseline for the generation of tsunami prevention and mitigation measures, including evacuation maps. Having noted that no evacuation maps exist for Manly, Sydney (an area recently subjected to high resolution building vulnerability assessment by Dall'Osso et al., 2009b, we use the results of the analysis by Dall'Osso et al. (2009b to "draft" tsunami evacuation maps that could be used by the local emergency service organisations. We then interviewed 500 permanent residents of Manly in order to gain a rapid assessment on their views about the potential usefulness of the draft evacuation maps we generated. Results of the survey indicate that residents think the maps are useful and understandable, and include insights that should be considered by local government planners and emergency risk management specialists during the development of official evacuation maps (and plans in the future.
Energy Technology Data Exchange (ETDEWEB)
NONE
1996-11-01
This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.
International Nuclear Information System (INIS)
1996-11-01
This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts
2018-01-01
Background The Hungarian draft is a horse breed with a recent mixed ancestry created in the 1920s by crossing local mares with draught horses imported from France and Belgium. The interest in its conservation and characterization has increased over the last few years. The aim of this work is to contribute to the characterization of the endangered Hungarian heavy draft horse populations in order to obtain useful information to implement conservation strategies for these genetic stocks. Methods To genetically characterize the breed and to set up the basis for a conservation program, in the present study a hypervariable region of the mitochrondial DNA (D-loop) was used to assess genetic diversity in Hungarian draft horses. Two hundred and eighty five sequences obtained in our laboratory and 419 downloaded sequences available from Genbank were analyzed. Results One hundred and sixty-four haplotypes and thirty-six polymorphic sites were observed. High haplotype and nucleotide diversity values (Hd = 0.954 ± 0.004; π = 0.028 ± 0.0004) were identified in Hungarian population, although they were higher within than among the different populations (Hd = 0.972 ± 0.002; π = 0.03097 ± 0.002). Fourteen of the previously observed seventeen haplogroups were detected. Discussion Our samples showed a large intra- and interbreed variation. There was no clear clustering on the median joining network figure. The overall information collected in this work led us to consider that the genetic scenario observed for Hungarian draft breed is more likely the result of contributions from ‘ancestrally’ different genetic backgrounds. This study could contribute to the development of a breeding plan for Hungarian draft horses and help to formulate a genetic conservation plan, avoiding inbreeding while. PMID:29404201
LBNL Institutional Plan, FY 1996--2001. Draft
International Nuclear Information System (INIS)
1995-06-01
The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy's strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory's scientific and support divisions
LBNL Institutional Plan, FY 1996--2001. Draft
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-06-01
The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.
2013-05-21
...] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear Recovery Plan... extending the public comment period for a Draft Revised Supplement to the Grizzly Bear Recovery Plan in the... to the Grizzly Bear Recovery Plan is available at http://www.fws.gov/mountain-prairie/species/mammals...
FY97 Geothermal R&D Program Plan
Energy Technology Data Exchange (ETDEWEB)
None
1996-09-01
This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)
76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan
2011-06-17
... developing access to construction trades through the enhancement of construction career pathways and the... providing an opportunity for a 30- day period of public review and written comment. During this time, the... Technology Program $2,400,000 Bulk Fuel/RPSU Planning, Design & $3,770,350 Construction. Renewable Energy...
2010-07-26
... implementation of the alternative plans. The District will work as part of a team to include the New York State... Engineers, New York District (District), is preparing a Draft Environmental Impact Statement (DEIS) to...) document in accordance with the President's Council of Environmental Quality (CEQ) Rules and Regulations...
2011-09-09
... a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS... development and other land use authorizations with resource values; and (6) climate change. The Draft RMP... authorizations, livestock grazing, mineral development and recreation. Bitter Creek (6,121 acres): This newly...
2013-08-16
... Availability of the Northwest Colorado Greater Sage- Grouse Draft Resource Management Plan Amendment and Draft... Land Management (BLM) has prepared a Northwest Colorado Greater Sage-Grouse Draft Resource Management.../or mailings. ADDRESSES: You may submit comments related to the Northwest Colorado Greater Sage-Grouse...
Planning for renewable energy in Devon
International Nuclear Information System (INIS)
1993-04-01
The aim of the Study was to examine the technical, planning and environmental factors, and the resource availability, which may affect the development of renewable energy schemes in Devon, with particular reference to West Devon. The study was undertaken to draw up a specimen planning policy framework for the development of renewable energy in Devon, looking at each major renewable energy source and at the relevant environmental and planning constraints; using this framework, to amplify the draft Structure Plan policy for renewable energy; to draw up draft guidance and specimen policies for a Local Plan covering renewable energy for a District Council, in this case, West Devon Borough; and to provide a pilot study for implementing the draft Planning Policy Guidance (PPG) on renewable energy. (author)
An exploratory shaft facility in SALT: Draft shaft study plan
International Nuclear Information System (INIS)
1987-03-01
This draft Shaft Study Plan describes a program of testing and monitoring in the Exploratory Shafts of a candidate high-level nuclear waste repository site in Deaf Smith County, Texas. The purpose of the programs to assist with site characterization in support of a determination of site suitability for development as a repository design and performance assessment evaluations. The program includes a variety of geological, geophysical, geomechanical, thermomechanical, and geohydrological testing and monitoring. The program is presented as a series of separate studies concerned with geological, geomechanical, and geohydrological site characterization, and with evaluating the mechanical and hydrological response of the site to construction of the shafts. The various studies, and associated test or monitoring methods are shown. The procedure used in developing the test program has been to initially identify the information necessary to satisfy (1) federal, state, and local requirements, and (2) repository program requirements. These information requirements have then been assessed to determine which requirements can be addressed wholly or in significant part by monitoring and testing from within the shafts. Test methods have been identified to address specific information requirements. 67 refs., 39 figs., 31 tabs
2011-09-16
... federally-owned subsurface mineral estate. The Colorado River Valley Field Office and the KFO were... Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In... Avenue, Kremmling, Colorado 80459. Copies of the Kremmling Draft RMP/EIS are available in the KFO at the...
Ham, J.M.; Blom-Bruggeman, J.M.
1989-01-01
A methodology has been developed for the cataloguing of hazardous (industrial) activities and the evaluation of these activities as part of the process of formulating an emergency management plan. This guide will enable priorities to be set at local level (district, region) for the drafting of
46 CFR 167.55-1 - Draft marks and draft indicating systems.
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 167.55-1... NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... aft to the location of the draft marks, due to a raked stem or cut away skeg, the draft must be...
Site observational work plan for the UMTRA Project site at Spook, Wyoming
International Nuclear Information System (INIS)
1995-05-01
The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)
2011-03-04
... matters related to program responsibilities. The Assistant Secretary for Health (ASH) has been designated... adult immunization coverage levels.'' The Adult Immunization Working Group (AIWG) of NVAC has developed a draft report and recommendations for the consideration of the NVAC. Individuals and organizations...
2011-07-29
... respondent will be available for public inspection at the locations listed below during their business hours... Idaho, Nevada, and Wyoming and Prospective Draft Land Use Plan Amendments AGENCY: Bureau of Land... Gateway West Transmission Line Project DEIS and prospective draft Land Use Plan (LUP) Amendments. The DEIS...
76 FR 53149 - North American Waterfowl Management Plan
2011-08-25
... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...
Energy Technology Data Exchange (ETDEWEB)
1993-10-01
This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.
Draft Transportation Institutional Plan
International Nuclear Information System (INIS)
1985-09-01
The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab
Considerations about noise aspects in the EEC draft directive physical agents
Passchier-Vermeer, W.
1992-01-01
This report contains an overview of and considerations about the Working Draft of a future EEC Directive Physical Agents (draft 1991). The overview in this report is limited to noise exposure. The Draft gives minimum regulations concerning the protection of workers and prevention against the risks
Draft At-Depth Study Plan for an exploratory shaft facility in salt: Revision 1
International Nuclear Information System (INIS)
1988-03-01
This draft At-Depth Study Plan describes a program of at-depth monitoring and testing in the bedded salt deposits of a candidate high-level nuclear waste repository site in Deaf Smith County, Texas. The test program will be undertaken within an At-Depth Facility (ADF) constructed at the candidate repository horizon. The purpose of the program is to assist with site characterization in support of determination of site suitability for development as a repository and for preparation of licensing documentation, and to provide information in support of repository design and performance assessment evaluation. The program includes a variety of geological, geophysical, geomechanical, thermochemical, and geohydrological monitoring and testing. The program is presented as a series of separate studies concerned with geological, geomechanical, and geohydrological site characterization, and with evaluating the mechanical and hydrological response of the site to construction of the ADF. The various studies, and associated test or monitoring methods, are included. Specific large-scale tests concerned with evaluating the performance of engineered components of the repository system (i.e., rooms, waste package, bulkhead and backfill seals) will be performed in the ADF but are described separately in individual Study Plan. 53 refs., 54 figs., 24 tabs
Draft 1992 Resource Program : Summary Report.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-01-01
The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future resource needs -- how much new resource development is needed by BPA, which types of resources to acquire and option, how to go about acquiring them, and how much to spend. The Northwest Power Planning Council completed a new Northwest Power Plan in 1991. This Draft Resource Program describes how BPA proposes to do its part to meet the Council's regional resource objectives.
2013-06-12
... jails and extensive experience in working with local jails on issues related to inmate mental health... mental illness. Scope of Work: The cooperative agreement awardee will draft a curriculum on (1) the key...--Curriculum Development: Planning and Implementing Effective Mental Health Services in Jails AGENCY: National...
2013-11-01
...] Notice of Availability of the Idaho and Southwestern Montana Greater Sage-Grouse Draft Land Use Plan... Environmental Impact Statement (EIS) for managing Greater Sage- Grouse (GRSG) in the Idaho and Southwestern... Southwestern Montana Greater Sage-Grouse Draft LUP Amendments/Draft EIS by any of the following methods: Email...
2013-05-28
...The Bureau of Reclamation has made available for public review and comment, the Draft Resource Management Plan (RMP)/Draft Environmental Impact Statement (DEIS) for the Newlands Project. This RMP/DEIS provides a range of alternatives for managing Reclamation- administered lands in the Newlands Project Planning Area, which is in the west-central Nevada counties of Washoe, Storey, Lyon, and Churchill.
Workshop for development of formal MC and A plans
International Nuclear Information System (INIS)
Erkkila, B.H.; Hatcher, C.R.; Scott, S.C.; Thomas, K.E.
1998-01-01
Upgrades to both physical protection and material controls and accountability (MC and A) are progressing at many nuclear facilities in the Russian Federation. In general, Russian facilities are well prepared to address issues related to physical protection. The infrastructure to plan and implement physical protection upgrades is already in place in Russia. The infrastructure to integrate new and existing MC and A capabilities is not as well developed. The authors experience has shown that working with Russian facility management and technical personnel to draft an MC and A plan provides a way of moving MC and A upgrades forward. Los Alamos has developed a workshop for Russian nuclear facilities to facilitate the preparation of their facility MC and A plans. The workshops have been successful in bringing together facility management, safeguards specialists, and operations personnel to initiate the process of drafting these MC and A plans. The MC and A plans provide the technical basis for scheduling future MC and A upgrades at the facilities. Although facility MC and A plans are site specific, the workshop can be tailored to guide the development of an MC and A plan for any Russian nuclear site
ADP Security Plan, Math Building, Room 1139
Energy Technology Data Exchange (ETDEWEB)
Melton, R.
1985-08-27
This document provides the draft copy of an updated (ADP) Security Plan for an IBM Personal Computer to be used in the Math Building at PNL for classified data base management. Using the equipment specified in this document and implementing the administrative and physical procedures as outlined will provide the secure environment necessary for this work to proceed.
2012-07-20
... Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended, and the... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the...
Drafting. A Bilingual Text = Dibujo Mecanico. Un Texto Bilingue.
Los Angeles Unified School District, CA. Div. of Career and Continuing Education.
This bilingual instructional text, one in a series of six texts covering various vocational and technical topics, provides secondary level English and Spanish instruction in drafting. Addressed in the individual units are the following topics: safety, drafting tools and techniques, sketching, geometric construction, working drawings, sectioning,…
Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)
International Nuclear Information System (INIS)
1994-09-01
This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets
Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)
Energy Technology Data Exchange (ETDEWEB)
1994-09-01
This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.
75 FR 28073 - Draft Regulatory Guide: Issuance, Availability
2010-05-19
... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Draft Regulatory Guide: Issuance, Availability... Guide, DG-3039, ``Standard Format and Content for Emergency Plans for Fuel Cycle and Materials...
2010-02-19
... Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment... Commission (CEC) have prepared a Draft Environmental Impact Statement (EIS), Draft California Desert... impacts of the proposed Solar Two Project on air quality, biological resources, cultural resources, water...
[Some psychological problems in family planning work].
Chen, J
1983-11-29
Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-09-30
In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.
Drafting Lab Management Guide.
Ohio State Univ., Columbus. Instructional Materials Lab.
This manual was developed to guide drafting instructors and vocational supervisors in sequencing laboratory instruction and controlling the flow of work for a 2-year machine trades training program. The first part of the guide provides information on program management (program description, safety concerns, academic issues, implementation…
2012-10-09
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-R-2012-N171; 1265-0000-10137-S3] Rose... Rose Atoll National Wildlife Refuge (NWR/refuge) for public review and comment. In the Draft CCP/EA, [email protected] . Include ``Rose Atoll National Wildlife Refuge Draft CCP/EA'' in the subject line of the...
Computer Assisted Drafting (CNC) Drawings. Drafting Module 6. Instructor's Guide.
Missouri Univ., Columbia. Instructional Materials Lab.
This Missouri Vocational Instruction Management System instructor's drafting guide has been keyed to the drafting competency profile developed by state industry and education professionals. This unit contains information on computer-assisted drafting drawings. The guide contains a cross-reference table of instructional materials and 20 worksheets.…
Basic plans on measures of mine site at the Ningyo-Toge Environmental Engineering Center
International Nuclear Information System (INIS)
2002-04-01
At the Ningyo-Toge and its peripheries, there are some mine relating facilities and apparatuses finishing their actions such as wasted stones and slags accumulation sites, and so on formed by results of searching and mining works of uranium mine carried out from beginning of 1950s by the Nuclear Fuels Corporation and the Power Reactor and Nuclear Fuel Development Corporation, both of which are predecessors of the Japan Nuclear Cycle Development Institute (JNC). These facilities are, at present, adequately maintained and managed by the Ningyo-Toge Environmental Engineering Center, but as resource development of uranium was positioned to a disposal business on JNC, JNC has investigated on optimal measuring methods and testing plans to evaluate their safety under cooperation with other works of JNC, to summarize a draft of the basic plans on measures of mine site'. Here were described two drafts of the 'Basic plans on measures of mine site' summarized on concepts and indications of whole of measures of mine relating facilities sites and of the 'Proof test plan' summarized on testing plans containing concrete measures to obtain basic data and knowledge required for progressing the measures and a proof test. (G.K.)
Enhanced radiological work planning; TOPICAL
International Nuclear Information System (INIS)
DECKER, W.A.
1999-01-01
The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System
Migration plans and hours of work in Malaysia.
Gillin, E D; Sumner, D A
1985-01-01
"This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt
2012-02-27
... proposed information collected is necessary for the proper performance of FDA's functions, including... the draft guidance for industry entitled: ``Planning for the Effects of High Absenteeism to Ensure Availability of Medically Necessary Drug Products'' (Absenteeism Draft Guidance) published in the Federal...
2010-01-08
.... This draft guidance applies to manufacturers of drug and therapeutic biologic products regulated by...: General preparedness through employee education and immunization, Prioritization of manufactured products... of information technology. The draft guidance recommends that manufacturers of drug and therapeutic...
Draft program plan for TNS: the next step after the tokamak fusion test reactor. Part I. Summary
International Nuclear Information System (INIS)
Roberts, M.
1977-10-01
A draft program plan for TNS has been prepared which consists of two basic parts--an R and D Needs Assessment and a Project Plan with schedules and necessary implementation steps. In this brief but intensive effort, questions concerning (1) the present basis for the TNS program, (2) the principal gaps in the supporting program, and (3) the necessary actions to be taken to implement the TNS program were examined. The study supported the thesis that the physics and technology bases do exist from which to start the TNS design as a central fusion program goal. Specific recommendations are made to emphasize those physics, technology, and engineering areas in which there are program gaps. In the project engineering study, a basic schedule with close support from the R and D program is developed from which recommendations on administrative actions and areas for further elucidation are made. This document presents in summary form the findings of the study, the development of the principal theses, and the recommendation to ERDA-DMFE
Energy planning and management plan
International Nuclear Information System (INIS)
1996-01-01
This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program
Numerical simulation of draft tube flow of a bulb turbine
Energy Technology Data Exchange (ETDEWEB)
Coelho, J.G. [Federal University of Triangulo Mineiro, Institute of Technological and Exact Sciences, Avenida Doutor Randolfo Borges Junior, 1250 – Uberaba – MG (Brazil); Brasil, A.C.P. Jr. [University of Brasilia, Department of Mechanical Engineering, Campus Darcy Ribeiro, Brasilia – DF (Brazil)
2013-07-01
In this work a numerical study of draft tube of a bulb hydraulic turbine is presented, where a new geometry is proposed. This new proposal of draft tube has the unaffected ratio area, a great reduction in his length and approximately the same efficiency of the draft tube conventionally used. The numerical simulations were obtained in commercial software of calculation of flow (CFX-14), using the turbulence model SST, that allows a description of the field fluid dynamic near to the wall. The simulation strategy has an intention of identifying the stall of the boundary layer precisely limits near to the wall and recirculations in the central part, once those are the great causes of the decrease of efficiency of a draft tube. Finally, it is obtained qualitative and quantitative results about the flow in draft tubes.
Schertz, Karen
This introductory module on drafting includes the technical content and tasks necessary for a student to be employed in an entry-level drafting occupation. The module contains 18 instructional units that cover the following topics: introduction to drafting; tools and equipment; supplies and materials; sketching; scales; drawing format; lettering;…
Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans
International Nuclear Information System (INIS)
1980-01-01
This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager
ATF Neutron Irradiation Program Technical Plan
Energy Technology Data Exchange (ETDEWEB)
Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division
2016-03-01
The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.
Evaluations for draft reports on geological disposal
International Nuclear Information System (INIS)
Maekawa, Keisuke; Igarashi, Hiroshi
2002-10-01
This report summarizes the results of the technical evaluations on two reports which are named as 'Overview of the Geological Disposal Facility' and Considerable Factors on Selection of Potential Sites for Geological Disposal' drafted by NUMO (Nuclear Waste Management Organization of Japan). The review of each draft report has been referred to committee (held on 9th September, 2002) and working group (held on 1st October, 2002) which were organized in order to confirm a progress of implementation of geological disposal by government. (author)
Traditional Engineering Graphics versus Computer-Aided Drafting: A View from Academe.
Foster, Robert J.
1987-01-01
Argues for a legitimate role of manually expressed engineering graphics within engineering education as a needed support for computer-assisted drafting work. Discusses what and how students should learn as well as trends in engineering graphics education. Compares and contrasts manual and computer drafting methods. (CW)
Training Planning and Working Memory in Third Graders
Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano
2013-01-01
Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…
First Draft of the Research Agenda
DEFF Research Database (Denmark)
Dahl, Hanne Marlene; Pieper, Michael; Fahnøe, Kristian
This report is a draft of a research agenda that the consortium INNOSERV has provided to the European Commission. It is the result of the work of researchers and insights provided by users, practitioners, experts and policy-makers involving around 20 examples of innovative practices from different...... and provide one of several sources of input from social platforms for HORISON 2020. INNOSERV is a social platform consisting of experts from various EU countries and key stakeholders and is itself an innovation in how researchers work together with representatives from various parts of society, thereby...... ensuring the relevance of the suggested draft of a research agenda. The seven themes identified are: User-centeredness innovation in social services, Innovation in institutional development, Framing of social services in relation to innovation, The governance of innovation, Influence of regional and local...
International Nuclear Information System (INIS)
M. Gross
2006-01-01
The overall objective of the work scope covered by this technical work plan (TWP) is to develop new damage abstractions for the seismic scenario class in total system performance assessment (TSPA). The new abstractions will be based on a new set of waste package and drip shield damage calculations in response to vibratory ground motion and fault displacement. The new damage calculations, which are collectively referred to as damage models in this TWP, are required to represent recent changes in waste form packaging and in the regulatory time frame. The new damage models also respond to comments from the Independent Validation Review Team (IVRT) postvalidation review of the draft TSPA model regarding performance of the drip shield and to an Additional Information Need (AIN) from the U.S. Nuclear Regulatory Commission (NRC)
Energy Technology Data Exchange (ETDEWEB)
M. Gross
2006-12-08
The overall objective of the work scope covered by this technical work plan (TWP) is to develop new damage abstractions for the seismic scenario class in total system performance assessment (TSPA). The new abstractions will be based on a new set of waste package and drip shield damage calculations in response to vibratory ground motion and fault displacement. The new damage calculations, which are collectively referred to as damage models in this TWP, are required to represent recent changes in waste form packaging and in the regulatory time frame. The new damage models also respond to comments from the Independent Validation Review Team (IVRT) postvalidation review of the draft TSPA model regarding performance of the drip shield and to an Additional Information Need (AIN) from the U.S. Nuclear Regulatory Commission (NRC).
2011-01-20
... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...
31 CFR 500.406 - Drafts under irrevocable letters of credit; documentary drafts.
2010-07-01
... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Drafts under irrevocable letters of credit; documentary drafts. 500.406 Section 500.406 Money and Finance: Treasury Regulations Relating to... ASSETS CONTROL REGULATIONS Interpretations § 500.406 Drafts under irrevocable letters of credit...
31 CFR 515.406 - Drafts under irrevocable letters of credit; documentary drafts.
2010-07-01
... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Drafts under irrevocable letters of credit; documentary drafts. 515.406 Section 515.406 Money and Finance: Treasury Regulations Relating to... CONTROL REGULATIONS Interpretations § 515.406 Drafts under irrevocable letters of credit; documentary...
1991-01-01
Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.
International Nuclear Information System (INIS)
1991-06-01
Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity
International Nuclear Information System (INIS)
1986-12-01
The Geochemistry Review Panel (GRP) was established by the Salt Repository Project Office (SRPO) to help evaluate geochemistry-related issues in the US Department of Energy's nuclear waste repository program. The May 1986 meeting of the GRP reviewed the Salt Repository Program (SRP) geochemistry program developed by the Office of Nuclear Waste Isolation (ONWI). This program is described in the Draft Geochemistry Plan of April 9, 1986. This report documents the GRP's comments and recommendations on this subject and the ONWI responses to the specific points raised by the GRP
2011-04-08
and sealed in brown envelopes and the envelopes bound together with a large rubber band. The top envelope had an affixed label printed in 25 font ...red text with the words "EYES ONLY" and the name of the recipient in 18 font red text, all underlined. In addition to the draft Report and...Marine Corps, Retired Commander two copies. One from Mr. Paul & :Mr. Juan Garcia Captain Copy made by Executive Asst to Mr. Robert Work USMC Colonel
Hanford Waste Management Plan, 1987
International Nuclear Information System (INIS)
1987-01-01
The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste
2013-03-18
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Draft Damage Assessment...: National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of Availability of a Draft... natural resources. Under the federal Oil Pollution Act (OPA), the National Oceanic and Atmospheric...
2011-06-10
... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...) has prepared a Draft Environmental Impact Statement (EIS) and a Draft Programmatic Agreement (PA.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver. The Draft EIS describes and analyzes SNWA's...
Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin
2015-04-01
The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize
National NIF Diagnostic Program Interim Management Plan
International Nuclear Information System (INIS)
Warner, B
2002-01-01
The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope
General Drafting. Technical Manual.
Department of the Army, Washington, DC.
The manual provides instructional guidance and reference material in the principles and procedures of general drafting and constitutes the primary study text for personnel in drafting as a military occupational specialty. Included is information on drafting equipment and its use; line weights, conventions and formats; lettering; engineering charts…
WIPP Facility Work Plan for Solid Waste Management Units
International Nuclear Information System (INIS)
2000-01-01
This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A
WIPP Facility Work Plan for Solid Waste Management Units
Energy Technology Data Exchange (ETDEWEB)
Washington TRU Solutions LLC
2000-02-25
This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA
BIM approach for automated drafting and design for modular construction manufacturing
Alwisy, A.; Al-Hussein, M.; Al-Jibouri, Saad H.S.; Issa, R.R.; Flood, I.
2012-01-01
Industrialization creates new requirements for design. Designers need to consider not only building performance, but also production plan needs. This requires a well-structured Building Information Model (BIM) to support the manufacturing needs for design and drafting. BIM, in combination with CAD
Draft Automatic Data Acquisition System Plan
International Nuclear Information System (INIS)
1987-04-01
This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs
ICDF Complex Remedial Action Work Plan
Energy Technology Data Exchange (ETDEWEB)
W. M. Heileson
2006-12-01
This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.
Wang, Zhuo; Pascual-Anaya, Juan; Zadissa, Amonida; Li, Wenqi; Niimura, Yoshihito; Huang, Zhiyong; Li, Chunyi; White, Simon; Xiong, Zhiqiang; Fang, Dongming; Wang, Bo; Ming, Yao; Chen, Yan; Zheng, Yuan; Kuraku, Shigehiro
2013-01-01
The unique anatomical features of turtles have raised unanswered questions about the origin of their unique body plan. We generated and analyzed draft genomes of the soft-shell turtle (Pelodiscus sinensis) and the green sea turtle (Chelonia mydas); our results indicated the close relationship of the turtles to the bird-crocodilian lineage, from which they split ~267.9–248.3 million years ago (Upper Permian to Triassic). We also found extensive expansion of olfactory receptor genes in these tu...
Socioeconomic Site Study Plan: Draft
International Nuclear Information System (INIS)
1987-07-01
Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs
Final Work Plan: Targeted Investigation at York, Nebraska
Energy Technology Data Exchange (ETDEWEB)
LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)
2016-08-01
The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.
Surface moisture measurement system acceptance testing work plan
International Nuclear Information System (INIS)
Ritter, G.A.
1996-01-01
This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing
2013-04-08
... Environmental Impact Statement and Land Protection Plan; Request for Public Comments AGENCY: Fish and Wildlife... a draft environmental impact statement (DEIS) and land protection plan (LPP) for the proposed... resources to enhance conservation; enhance recreation; increase tourism; instill new money into local...
Draft of the PHENIX Management Plan
International Nuclear Information System (INIS)
1994-01-01
The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... Impact Statements § 51.74 Distribution of draft environmental impact statement and supplement to draft...
Articulation Workshop in Drafting. Final Report.
Catonsville Community Coll., MD.
Drafting students from vocational/technical and high schools frequently repeat the same experiences and courses and work with the same instructional materials when they enroll in college engineering drawing, and architecture programs. In order to minimize needless repetition and address the problem of articulation between such schools and the…
Strategic Planning and Values in Secondary School
Directory of Open Access Journals (Sweden)
Damjana Gruden
2012-06-01
Full Text Available RQ: Which factors have a decisive influence on a school’s strategic development?Purpose: The purpose of this research is the improvement of school development and the goal of this research study was to prepare a draft for strategic planning.Method: Qualitative method is used in the first phase of the research study. An annual interview was conducted with secondary technical and vocational school teaching staff. In the second phase of this research study, a survey with one question was distributed to the teaching staff. The question on the survey referred to teachersvalues that stemmed from the interviews. The directed question was on the values that that should be emphasized in assisting the school to prepare a strategic development plan.Results: The results of this research study showed that strategic development of the school is based on values and activities that provide for quality education,professional and practical knowledge, strengthen and develop interpersonal relations and provide good connections between schools, craftsmen, and the economy.Organization: By defining the school’s priorities, it will become easier for the staff to prepare the school’s development strategy and action plans for individual tasks.Society: Awareness and developing values through activities at school provides support to adolescents and young adults in developing their life style. Values lead the behavior of individuals and consequently,are very important for society.Originality: Through the research study the school obtained thebasic values that will be used in drafting a development plan. This will be the first such document for the school. Up until now planning has been performed only in terms of short-term planning within the annual work plan.Limitations: The survey was conducted among the staff of one vocational and technical secondary school. Further research would be required to include parents and students and to start introducing evaluation and
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for the two course sequences of the state's postsecondary-level drafting and design technology program: architectural drafting technology and drafting and design technology. Presented first are a program description and…
DEFF Research Database (Denmark)
Hasle, Peter; Møller, Niels
2001-01-01
The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....
2013-03-22
...] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear Recovery Plan... Revised Supplement to the Grizzly Bear Recovery Plan. Specifically, this supplement proposes to revise the demographic recovery criteria for the Yellowstone Ecosystem. In the lower 48 States, Grizzly bears (Ursus...
Office of Inspector General fiscal year 1996 annual work plan
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-10-01
This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.
FY 1999 annual work plan for infrastructure program WBS 6
Energy Technology Data Exchange (ETDEWEB)
Donley, C.D.
1998-08-27
The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.
75 FR 63851 - Draft Friends Organizations Policy
2010-10-18
...] Draft Friends Organizations Policy AGENCY: Fish and Wildlife Service, Department of the Interior. ACTION... Service's mission through partnerships with Friends organizations (volunteer/advocate). Today, Friends organizations play a vital role in helping to fulfill the Service's mission of ``working with others, to...
2010-06-01
... Mountain salamander and Indiana bat. Its dominant habitats include wet meadows, peatlands, shrub and... refuge revenue sharing payments, and continuing our role in land conservation partnerships. The draft CCP... wetland complex as a Research Natural Area. The hunt program would remain the same as alternative A...
Toupin April, Karine; Barton, Jennifer; Fraenkel, Liana; Li, Linda; Grandpierre, Viviane; Guillemin, Francis; Rader, Tamara; Stacey, Dawn; Légaré, France; Jull, Janet; Petkovic, Jennifer; Scholte Voshaar, Marieke; Welch, Vivian; Lyddiatt, Anne; Hofstetter, Cathie; De Wit, Maarten; March, Lyn; Meade, Tanya; Christensen, Robin; Gaujoux-Viala, Cécile; Suarez-Almazor, Maria E.; Boonen, Annelies; Pohl, Christoph; Martin, Richard; Tugwell, Peter
2015-01-01
Objective Despite the importance of shared decision making for delivering patient-centred care in rheumatology, there is no consensus on how to measure its process and outcomes. The aim of this OMERACT working group is to determine the core set of domains for measuring shared decision making in intervention studies in adults with osteoarthritis (OA), from the perspective of patients, health professionals and researchers. Methods We followed the OMERACT Filter 2.0 to develop a draft core domain set, which consisted of: (i) forming an OMERACT working group; (ii) conducting a review of domains of shared decision making; and (iii) obtaining the opinions of stakeholders using a modified nominal group process held at a session activity at the OMERACT 2014 meeting. Results 26 stakeholders from Europe, North America and Australia, including 5 patient research partners, participated in the session activity. Participants identified the following domains for measuring shared decision making to be included as part of the Draft Core Set: 1) Identifying the decision; 2) Exchanging Information; 3) Clarifying views; 4) Deliberating; 5) Making the decision; 6) Putting the decision into practice; and 7) Assessing the impact of the decision. Contextual factors were also suggested. Conclusion We propose a Draft Core Set of shared decision making domains for OA intervention research studies. Next steps include a workshop at OMERACT 2016 to reach consensus on these proposed domains in the wider OMERACT group, as well as detail sub-domains and assess instruments to develop a Core Outcome Measurement Set. PMID:25877502
Toupin-April, Karine; Barton, Jennifer; Fraenkel, Liana; Li, Linda; Grandpierre, Viviane; Guillemin, Francis; Rader, Tamara; Stacey, Dawn; Légaré, France; Jull, Janet; Petkovic, Jennifer; Scholte-Voshaar, Marieke; Welch, Vivian; Lyddiatt, Anne; Hofstetter, Cathie; De Wit, Maarten; March, Lyn; Meade, Tanya; Christensen, Robin; Gaujoux-Viala, Cécile; Suarez-Almazor, Maria E; Boonen, Annelies; Pohl, Christoph; Martin, Richard; Tugwell, Peter S
2015-12-01
Despite the importance of shared decision making for delivering patient-centered care in rheumatology, there is no consensus on how to measure its process and outcomes. The aim of this Outcome Measures in Rheumatology (OMERACT) working group is to determine the core set of domains for measuring shared decision making in intervention studies in adults with osteoarthritis (OA), from the perspectives of patients, health professionals, and researchers. We followed the OMERACT Filter 2.0 method to develop a draft core domain set by (1) forming an OMERACT working group; (2) conducting a review of domains of shared decision making; and (3) obtaining opinions of all those involved using a modified nominal group process held at a session activity at the OMERACT 12 meeting. In all, 26 people from Europe, North America, and Australia, including 5 patient research partners, participated in the session activity. Participants identified the following domains for measuring shared decision making to be included as part of the draft core set: (1) identifying the decision, (2) exchanging information, (3) clarifying views, (4) deliberating, (5) making the decision, (6) putting the decision into practice, and (7) assessing the effect of the decision. Contextual factors were also suggested. We proposed a draft core set of shared decision-making domains for OA intervention research studies. Next steps include a workshop at OMERACT 13 to reach consensus on these proposed domains in the wider OMERACT group, as well as to detail subdomains and assess instruments to develop a core outcome measurement set.
Work-Family Planning Attitudes among Emerging Adults
Basuil, Dynah A.; Casper, Wendy J.
2012-01-01
Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…
Transmission System Vegetation Management Program. Draft Environmental Impact Statement - Appendices
International Nuclear Information System (INIS)
1999-01-01
The appendices covered in this Draft Environmental Impact Statement are: Appendix A--Public involvement; Appendix B--Biological weed control agents; Appendix C--BPA herbicide licensing plan; Appendix D--Sample educational information; Appendix E--Clearance criteria; Appendix F--USFS mitigation measures and background; Appendix G--BLM mitigation measures and background and Appendix H--Pesticide fact sheets
Draft 1992 Resource Program : Technical Report.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-01-01
The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.
Draft 1992 Resource Program : Technical Report.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-01-01
The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.
Salt repository sealing materials development program: 5-year work plan
International Nuclear Information System (INIS)
Myers, L.B.
1986-06-01
This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing
LEGAL DRAFTING IN CROATIA - CASE STUDY
Directory of Open Access Journals (Sweden)
Dario Đerđa
2017-01-01
Full Text Available This paper highlights the importance of legal drafting and its essential elements, which has not drawn a lot of attention in the Republic of Croatia so far. The paper emphasises the importance of proportionality in the simplicity and legal distinctness of a legal text in the process of drafting for the purpose of its clarity. The paper also presents objective requirements necessary for quality legal drafting, as well as subjective qualities of the drafters. With the purpose of drawing attention to imperfections in the legal drafting in Croatia, some defi ciencies are presented in the process of drafting and amending of the Utility Services Act. The process of drafting and amending of this Act is a good example of the way how legal drafting should not be done. It contains a lot of defi ciencies and failures that are the result of legal drafting mistakes. At the end, authors expect that the adoption of the Uniform methodology and nomotechnical rules for the drafting of acts enacted by Parliament should contribute to the higher quality of legal texts and to their full adjustment to the general requirements of legal certainty and rule of law.
EPA scientific integrity policy draft
Showstack, Randy
2011-08-01
The U.S. Environmental Protection Agency (EPA) issued its draft scientific integrity policy on 5 August. The draft policy addresses scientific ethical standards, communications with the public, the use of advisory committees and peer review, and professional development. The draft policy was developed by an ad hoc group of EPA senior staff and scientists in response to a December 2010 memorandum on scientific integrity from the White House Office of Science and Technology Policy. The agency is accepting public comments on the draft through 6 September; comments should be sent to osa.staff@epa.gov. For more information, see http://www.epa.gov/stpc/pdfs/draft-scientific-integrity-policy-aug2011.pdf.
76 FR 77431 - Decommissioning Planning During Operations
2011-12-13
... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...
Site observational work plan for the UMTRA project site at Grand Junction, Colorado
International Nuclear Information System (INIS)
1996-01-01
This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer
Burn site groundwater interim measures work plan.
Energy Technology Data Exchange (ETDEWEB)
Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)
2005-05-01
This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.
Informal work and formal plans
DEFF Research Database (Denmark)
Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm
2012-01-01
trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...
Russian MINATOM nuclear safety research strategic plan. An international review
International Nuclear Information System (INIS)
1999-03-01
The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)
2013-10-29
... Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft... Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff...
The shape of natural draft cooling towers
International Nuclear Information System (INIS)
Grange, J.L.
1992-07-01
The shape of cooling towers is more often designed empirically. There, it is considered from a theoretical point of view. The analysis of dynamic of natural draft and of the air flow in a cooling tower shell is presented. It is shown, that although it is convergent, a tower works like a diffuser for pressure recovery. And it is turbulence that produces a transfer of kinetic energy and allows a good operation of the diffusor. The equations permit to define a shell profile which depends upon the operating conditions of the cooling tower. In the same way, a stability criteria for natural draft depending upon operating conditions is established. A heating model of one meter diameter has been built in a thermal similitude. The turbulence rate has been measured with a hot wire anemometer at the tower exit and visualizations have also been made. Natural draft stability has been studied by these means for four different shell shapes and a wide range of operating conditions. Experimental and theoretical results agree satisfactorily and experiments can be considered as a validation of theory
Technical Work Plan for: Fracture and Lithophysal Studies
International Nuclear Information System (INIS)
2006-01-01
The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models
Technical Work Plan for: Fracture and Lithophysal Studies
Energy Technology Data Exchange (ETDEWEB)
n
2006-09-11
The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.
2011-03-15
... and recommendations could be found on the Web at http://www.hhs.gov/nvpo/nvac/subgroups/adultimmunization . The Web address where the draft report and recommendations can be found is http://www.hhs.gov...) The draft report and recommendations are available on the Web at http://www.hhs.gov/nvpo/nvac...
78 FR 57538 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement
2013-09-19
..., Chief, Communication, Planning, and Rulemaking Branch Waste Confidence Directorate, Office of Nuclear...-2012-0246] RIN 3150-AJ20 Proposed Waste Confidence Rule and Draft Generic Environmental Impact... disposal (proposed Waste Confidence rule). In addition, the NRC will receive public comment on its...
Municipal Development Plan, Acerra (Naples
Directory of Open Access Journals (Sweden)
Luigi Benevolo
2014-02-01
Full Text Available The Municipal Development Plan (Piano Urbanistico Comunale - PUC of Acerra has been drafted by a group of young professionals and researchers, led by Leonardo Benevolo, in accordance with the guidelines laid out by Regional Law no. 16 of 2004. Its complex drafting process was compressed into a brief, nine-month period in 2008 and 2009, at the end of which its initial adoption (or “predisposizione” – “preparation” or “predisposition” – in Italian legal terms was ratified by the municipal council. This article reconstructs the key moments, illustrating the main elements of the plan and how the debate about it took shape both inside and outside the municipal administration.
Illinois Occupational Skill Standards: Mechanical Drafting Cluster.
Illinois Occupational Skill Standards and Credentialing Council, Carbondale.
This document, which is intended as a guide for work force preparation program providers, details the Illinois occupational skill standards for programs preparing students for employment in occupations in the mechanical drafting cluster. The document begins with a brief overview of the Illinois perspective on occupational skill standards and…
Illinois Occupational Skill Standards: Architectural Drafting Cluster.
Illinois Occupational Skill Standards and Credentialing Council, Carbondale.
This document, which is intended as a guide for work force preparation program providers, details the Illinois occupational skill standards for programs preparing students for employment in occupations in the architectural drafting cluster. The document begins with a brief overview of the Illinois perspective on occupational skill standards and…
The International Space Life Sciences Strategic Planning Working Group
White, Ronald J.; Rabin, Robert; Lujan, Barbara F.
1993-01-01
Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.
2010-10-15
... reduced for certain environmental resource areas (i.e., for transportation, public and occupational health... NUCLEAR REGULATORY COMMISSION [NRC-2009-0435] Notice of Availability of Draft Environmental... of Availability of Draft Environmental Assessment and Draft Finding of No Significant Impact; Notice...
2013-02-26
... components, including Source Plasma. The guidance announced in this notice replaces the draft guidance... before it begins work on the final version of the guidance, submit either electronic or written comments... the SUPPLEMENTARY INFORMATION section for electronic access to the draft guidance document. Submit...
Applying Planning Algorithms to Argue in Cooperative Work
Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía
Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.
Dose exposure work planning using DMU kinematics tools
International Nuclear Information System (INIS)
Rosli Darmawan
2010-01-01
The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)
A draft business plan for the production of PZC 99Mo-99mTc generator in the Philippines
International Nuclear Information System (INIS)
Sombrito, Elvira Z.; Cabalfin, Estelita G.; Calix, Virginia S.; Dela Rosa, Alumanda M.; Borras, Ma. Teresa L.; Bulos, Adelina dM.
2007-01-01
Technetium-99m ( 99m Tc) remains as the main workhorse of nuclear medicine in the country. Alone or conjugated with other ligands, it is being used to show the function of major organs and other tissues such as the lung, brain, kidney, liver and bone. It is imported to the country as 99 Mo- 99m Tc generator. These commercial generators use fission molybdenum adsorbed onto alumina column. The FNCA project has shown the feasibility of using a PZC column-reactor 99 Mo generator for commercial applications, citing mainly the cheaper cost of the PZC generator than the imported alumina column-fission 99 Mo generator. PNRI proposes in this draft business plan, the commercial production of PZC generator through the establishment of a facility for the in-house production of 99 Mo- 99m Tc generator. The generator will use PZC coming from Japan as the column material, 99 Mo sourced from neighboring countries and an automatic loading and adsorption machine. Because the PNRI has no local production of the generator, the requirements for successfully venturing into this business activity may differ from the other FNCA members. A careful assessment based on verified data will be needed to refine the business plan. (author)
78 FR 54949 - Major Project Financial Plan Guidance
2013-09-06
...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...
2013-06-24
...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.
TWRS Systems Engineering Working Plan
International Nuclear Information System (INIS)
Eiholzer, C.R.
1994-01-01
The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations
Incorporating ecological risk assessment into remedial investigation/feasibility study work plans
International Nuclear Information System (INIS)
1994-06-01
This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites
Incorporating ecological risk assessment into remedial investigation/feasibility study work plans
Energy Technology Data Exchange (ETDEWEB)
1994-06-01
This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.
International Nuclear Information System (INIS)
1991-09-01
This report describes the investigative work planned at the potential location Bois de la Glaive, one of four possible locations for a waste disposal site for short-lived low and intermediate-level radioactive waste in Switzerland. This document replaces the 'plan d'execution BDG 89' dated October 1989, which lists the work which Nagra intends to carry out according to the preparatory work in accordance with Article 15 of the Bundesgesetz (Federal Law) regarding compulsory expropriation. This action was unfortunately necessary owing to the intense local opposition to the project. Owing to this opposition it was only possible to carry out field tests for the geophysical work and the plaster capped drill holes at the Bois de la Glaive as well as the hydrological cadastre. Thanks to a recommendation by the local authority and an amicable arrangement with the private owners at most of the observation points, it was possible to start periodic inspection measurements within the framework of the hydrogeological tests from March 1991. The aim of the tests described in this document is to obtain primary geological knowledge, as well as, where applicable, identify possible disqualifying criteria for the potential location at Bois de la Glaive. The different geological and hydrogeological tests are presented following an introduction which refers to the geological, historical and legal problems. It is intended to carry out these tests in 1991/92 possibly extending over into the first quarter 1993. Thus the necessary level of information should be achieved for this location. (author) figs., tabs., 14 refs
Vortex rope instabilities in a model of conical draft tube
Skripkin, Sergey; Tsoy, Mikhail; Kuibin, Pavel; Shtork, Sergey
2017-10-01
We report on experimental studies of the formation of vortex ropes in a laboratory simplified model of hydroturbine draft tube. Work is focused on the observation of various flow patterns at the different rotational speed of turbine runner at fixed flow rate. The measurements involve high-speed visualization and pressure pulsations recordings. Draft tube wall pressure pulsations are registered by pressure transducer for different flow regimes. Vortex rope precession frequency were calculated using FFT transform. The experiments showed interesting features of precessing vortex rope like twin spiral and formation of vortex ring.
Vortex rope instabilities in a model of conical draft tube
Directory of Open Access Journals (Sweden)
Skripkin Sergey
2017-01-01
Full Text Available We report on experimental studies of the formation of vortex ropes in a laboratory simplified model of hydroturbine draft tube. Work is focused on the observation of various flow patterns at the different rotational speed of turbine runner at fixed flow rate. The measurements involve high-speed visualization and pressure pulsations recordings. Draft tube wall pressure pulsations are registered by pressure transducer for different flow regimes. Vortex rope precession frequency were calculated using FFT transform. The experiments showed interesting features of precessing vortex rope like twin spiral and formation of vortex ring.
Competency Reference for Computer Assisted Drafting.
Oregon State Dept. of Education, Salem. Div. of Vocational Technical Education.
This guide, developed in Oregon, lists competencies essential for students in computer-assisted drafting (CAD). Competencies are organized in eight categories: computer hardware, file usage and manipulation, basic drafting techniques, mechanical drafting, specialty disciplines, three dimensional drawing/design, plotting/printing, and advanced CAD.…
Current status of quality assurance of treatment planning systems
International Nuclear Information System (INIS)
Mijnheer, B.J.
1997-01-01
A review is given of the current status of quality assurance of treatment planning systems. At this moment only one comprehensive report is available. In order to review national activities a questionnaire has been distributed amongst national societies of medical physicists. From the 23 responding countries, 8 indicated that only limited efforts are underway, 8 answered that a working group is evaluating their specific national requirements while in 5 countries a document is drafted. The highlights of these reports have been summarized. (author)
Radiological Work Planning and Procedures
Kurtz, J E
2000-01-01
Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...
Planning of optimal work path for minimizing exposure dose during radiation work in radwaste storage
International Nuclear Information System (INIS)
Kim, Yoon Hyuk; Park, Won Man; Kim, Kyung Soo; Whang, Joo Ho
2005-01-01
Since the safety of nuclear power plant has been becoming a big social issue, the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate dose not depend on the location within a work space, thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation during radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, the developed numerical method and simulation program could be useful tools in the planning of radiation work
2013-01-16
... draft revisions to Comprehensive Plan Public Comment, National Capital Planning Commission, 401 9th Street NW., Suite 500, Washington, DC 20004. The public meeting will be held at 401 9th Street NW., North.... SUPPLEMENTARY INFORMATION: Electronic Access and Filing Addresses You may submit comments electronically at the...
Analytical and Experimental Draft Force Evaluation of Plastic Coated Chisel Tines
Directory of Open Access Journals (Sweden)
M Barzegar Tabrizi
2017-10-01
Full Text Available Introduction Improving the efficiency of all agricultural operations has always been important for farmers and engineers. It is well known that the force required for cutting a soil using narrow blades is a function of soil and environmental physical properties, tool shape geometry and the tool’s surface characteristics like soil-tool adhesion and friction. Soil tool adhesion can reduce ploughing efficiency and quality. It may also halt the movement of tillage machines in more severe conditions. Adhesion can also disable some machine abilities, which can result in a significant reduction of machine performance. Adhesion of the soil to seed-bed preparation tools like furrowers can significantly affect the germination rate. Reducing soil tool adhesion of furrowers can reduce draft force and improve ploughing efficiency. Many researchers have worked on methods of reducing draft force by modifying the surface material and/or surface texture of the plough tools. A good prediction on draft force of a tool before producing it has always been important for farmers and engineers. There are some models for predicting the draft force of narrow blades in soil. McKyes-Ali’s model is widely used because of its accuracy and simplicity. Ultra-high molecular weight polythene (UHMW-PE is a polymer with ultra-high weight and long molecular chains and is well known for its outstanding physical and chemical properties and self-cleaning abilities, which reduce soil-tool adhesion. The aim of this study was to investigate usability of UHMW-PE coated furrower tines for draft force. Analytical and experimental investigations were carried out during the research. A comparison was conducted between the analytical and the experimental method. The results of this comparison can be used to determine reliability of the analytical model for predicting the draft force improvement caused by the surface modification on tines using different surface coatings. Materials and
75 FR 80850 - Development of Strategic Plan 2011-2015
2010-12-23
... intended for use as LSC embarks on its planning process. LSC anticipates publishing a draft Strategic Plan... process to develop a Strategic Plan for the years 2011-2015. Toward that end, LSC is soliciting... strategic planning efforts. In addition, Among other sources, LSC is considering the guidance provided by...
Planned Parenthood works with Korean government.
Yang, J M
1968-01-01
In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.
Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado
International Nuclear Information System (INIS)
1996-03-01
The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards
Housekeeping category corrective action unit work plan
International Nuclear Information System (INIS)
1996-08-01
The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process
2012-07-25
... Environmental Assessment and Draft San Luis Valley Regional Habitat Conservation Plan, Colorado AGENCY: Fish and...; Alamosa, Conejos, Costilla, Mineral, Rio Grande, and Saguache Counties; the municipalities of Alamosa, Monte Vista, Del Norte, and South Fork; and the State of Colorado Department of Natural Resources...
Informal work and formal plans
DEFF Research Database (Denmark)
Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm
2012-01-01
INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...
Tank waste remediation system multi-year work plan
International Nuclear Information System (INIS)
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders
Tank waste remediation system multi-year work plan
Energy Technology Data Exchange (ETDEWEB)
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.
Evaluation of Worktext in Mechanical Drafting
Directory of Open Access Journals (Sweden)
Erich D. Cruz
2015-11-01
Full Text Available This study aimed to evaluate Worktext in Drafting Technology 4 (Mechanical Drafting for Bachelor of Technology (BT major in Drafting Technology. It was conducted at University of Rizal System with twenty Drafting and Mechanical Technology professors as respondents. The study used the descriptive evaluative method to describe and evaluate the developed Worktext in DT 4 using the questionnaire-checklist in gathering data. They were asked to evaluate the worktext through the following: objectives, contents, activities, presentation and style, organization, creativity, evaluation, accuracy, completeness and appropriateness. It was found out that the developed worktext with respect to objectives was highly agree, contents was highly agree, activities was highly agree, presentation and style was agree, creativity was highly agree and evaluation was highly agree. Meaning that the items with highly agree interpretations attained excellent level of acceptability while those with agree interpretations obtained extensive level of acceptability with fully achieved and above average Drafting standards, respectively. It was also found out that the developed worktext in terms of accuracy was high, completeness was very high and appropriateness was likewise very high. The researcher recommends that the developed Worktext in Drafting Technology 4 may be adopted for use by the Bachelor of Technology major in Drafting Technology students.
Predicted percentage dissatisfied with ankle draft.
Liu, S; Schiavon, S; Kabanshi, A; Nazaroff, W W
2017-07-01
Draft is unwanted local convective cooling. The draft risk model of Fanger et al. (Energy and Buildings 12, 21-39, 1988) estimates the percentage of people dissatisfied with air movement due to overcooling at the neck. There is no model for predicting draft at ankles, which is more relevant to stratified air distribution systems such as underfloor air distribution (UFAD) and displacement ventilation (DV). We developed a model for predicted percentage dissatisfied with ankle draft (PPD AD ) based on laboratory experiments with 110 college students. We assessed the effect on ankle draft of various combinations of air speed (nominal range: 0.1-0.6 m/s), temperature (nominal range: 16.5-22.5°C), turbulence intensity (at ankles), sex, and clothing insulation (thermal sensation and air speed at ankles are the dominant parameters affecting draft. The seated subjects accepted a vertical temperature difference of up to 8°C between ankles (0.1 m) and head (1.1 m) at neutral whole-body thermal sensation, 5°C more than the maximum difference recommended in existing standards. The developed ankle draft model can be implemented in thermal comfort and air diffuser testing standards. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Energy Technology Data Exchange (ETDEWEB)
Allwine, K Jerry; Flaherty, Julia E.
2007-08-01
This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.
International Nuclear Information System (INIS)
1996-08-01
This appendix discusses the scope of actions addressed in the Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. To address the purpose and need for agency action identified in Chapter 2.0 of the HRA-EIS, the scope includes an evaluation of the potential environmental impacts associated with the remedial actions to be conducted by the US Department of Energy (DOE) under the provisions of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1989). These remedial actions would bring the Hanford Site into compliance with the applicable requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA). The DOE program responsible for conducting remedial actions at the Hanford Site is referred to as the Richland Environmental Restoration (ER) Project. The Richland ER Project encompasses the following projects: radiation area remedial actions and underground storage tanks (UST); RCRA closures; single-shell tank (SST) closures; past-practice waste site operable unit (source and groundwater) remedial actions; surplus facility decommissioning; and waste storage and disposal facilities
2010-07-01
... and evaluation of performance under the grant agreement. (2) An approvable work plan must specify: (i... and a time frame for their accomplishment; (iv) A performance evaluation process and reporting... environmental program grant if the portions of the Performance Partnership Agreement that serve as all or part...
Readiness to proceed: Characterization planning basis
International Nuclear Information System (INIS)
Adams, M.R.
1998-01-01
This report summarizes characterization requirements, data availability, and data acquisition plans in support of the Phase 1 Waste Feed Readiness to Proceed Mid-Level Logic. It summarizes characterization requirements for the following program planning documents: Waste Feed Readiness Mid-Level Logic and Decomposition (in development); Master blue print (not available); Tank Waste Remediation System (TWRS) Operations and Utilization Plan and Privatization Contract; Enabling assumptions (not available); Privatization low-activity waste (LAW) Data Quality Objective (DQO); Privatization high-level waste (HLW) DQO (draft); Problem-specific DQOs (in development); Interface control documents (draft). Section 2.0 defines the primary objectives for this report, Section 3.0 discusses the scope and assumptions, and Section 4.0 identifies general characterization needs and analyte-specific characterization needs or potential needs included in program documents and charts. Section 4.0 also shows the analyses that have been conducted, and the archive samples that are available for additional analyses. Section 5.0 discusses current plans for obtaining additional samples and analyses to meet readiness-to-proceed requirements. Section 6.0 summarizes sampling needs based on preliminary requirements and discusses other potential characterization needs. Many requirements documents are preliminary. In many cases, problem-specific DQOs have not been drafted, and only general assumptions about the document contents could be obtained from the authors. As a result, the readiness-to-proceed characterization requirements provided in this document are evolving and may change
Sectored Clean-up Work Plan for Housekeeping Category Waste Sites
International Nuclear Information System (INIS)
Nacht, S. J.
2000-01-01
The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs
Project Management Plan (PMP) for Work Management Implementation
International Nuclear Information System (INIS)
SHIPLER, C.E.
2000-01-01
The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system
Planning and Evaluating Educational Work in Slovene Preschools
Directory of Open Access Journals (Sweden)
Marcela Batistič Zorec
2012-01-01
Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.
Radiological Work Planning and Procedures
International Nuclear Information System (INIS)
KURTZ, J.E.
2000-01-01
Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD
Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement
Energy Technology Data Exchange (ETDEWEB)
N/A
1999-05-14
On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering & Services; COGEMA, Inc.; and Stone & Webster (known as DCS) to provide the requested
Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement
International Nuclear Information System (INIS)
1999-01-01
On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering and Services; COGEMA, Inc.; and Stone and Webster (known as DCS) to provide the requested services. The procurement process
2012-02-24
... BLM will announce future meetings or hearings and any other public participation activities at least..., Attention--Eastern Interior Draft RMP/EIS, Bureau of Land Management, 1150 University Avenue, Fairbanks... interior Alaska and is divided into four geographic areas: The Fortymile, Steese, Upper Black River, and...
Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11
International Nuclear Information System (INIS)
Moore, D.A.
1994-09-01
The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan
Learners’ processes during pre-task planning and Working Memory Capacity
Directory of Open Access Journals (Sweden)
Maria da Gloria Tavares
2016-01-01
Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.
Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms
Dalland, Cecilie P.; Klette, Kirsti
2014-01-01
This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…
77 FR 14047 - Guidance for Decommissioning Planning During Operations
2012-03-08
...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...
2013-01-25
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMR-LAMR-10224; 2310-0091-422] Off-Road... Service (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the Off- Road Vehicle... impacts of four alternatives that address off-road vehicle (ORV) management in the national recreation...
WIPP Facility Work Plan for Solid Waste Management Units
Energy Technology Data Exchange (ETDEWEB)
Washington TRU Solutions LLC
2001-02-25
This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.
2011-12-23
.... Operation related activities could include solar panel maintenance, on-site parking, operation of solar...-FXES11120800000F2-123] Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species... National Environmental Policy Act for the proposed Maricopa Sun Solar Complex Habitat Conservation Plan...
OZKAN, Aysen; YILDIRIM, Kemal
2016-01-01
Problem Statement: Drafting course is essential for students in the design disciplines for becoming more organized and for complying with standards in the educational system. Drafting knowledge is crucial, both for comprehension of the issues and for the implementation phase. In any design project, drafting performance and success are as important as the design process, especially in the educational environments aimed at professional life. However, there have been relatively any studies under...
Siberian Chemical Combine laboratory project work plan, fiscal year 1999
International Nuclear Information System (INIS)
Morgado, R.E.; Acobyan, R.; Shropsire, R.
1998-01-01
The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves
Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority
1987-10-01
The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.
2013-01-25
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO-11522; PX.P0131800B.00.1] Draft Environmental Impact Statement for Merced Wild and Scenic River Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa Counties, CA AGENCY: National Park Service, Interior. ACTION: Notice of...
PUREX facility preclosure work plan
International Nuclear Information System (INIS)
Engelmann, R.H.
1997-01-01
This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)
2011-11-09
... (Grand Ballroom-Allagash and Aroostook rooms) (207) 768-9502; December 14 at Black Bear Inn, 4 Godfrey... requiring rehabilitation; and up to 5 could be killed (3 adults and 2 kittens indirectly killed because their mother was killed in a trap). The MDIFW draft ITP proposes various measures to minimize and...
Foreign University Involvement in Sustainable New Town Planning in Provincial China
Directory of Open Access Journals (Sweden)
David. J. Edelman
Full Text Available ABSTRACT: Recent concern with sustainable urban development has focused on the widespread development of new towns and the expansion of cities throughout China. In recent decades, an increasing number of planning and design professionals in the United States and Europe have undertaken consulting work in China. This study examines the first instance of a Chinese city funding an American academic planning unit to create a conceptual plan for a new town. The School of Planning from the University of Cincinnati was commissioned to prepare the conceptual plan for the Anyang Eastern New Town. Prior to the drafting of the plan, faculty and students visited the site on a reconnaissance and data gathering mission, undertook research and studio work, organized presentations, and navigated the labyrinthine bureaucracy at the local, provincial, and national levels. These experiences differ considerably from those encountered in places such as Shanghai and the southern coastal plain region. This article identifies a number of issues that play a key role in the success of projects involving American or European Universities in conjunction with the Chinese government, particularly provincial authorities. This paper provides a valuable reference for any organization involved in such undertakings. KEYWORDS: Chinese urban planning, sustainable urban design, provincial planning
Planning in All its (Dis)guises: Spheres of Government, Functional ...
African Journals Online (AJOL)
Planning in All its (Dis)guises: Spheres of Government, Functional Areas and ... Draft legislation such as the Spatial Planning and Land Use Management Bill ... of co-operative government where uncertainty and conflict exist is examined, ...
Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement
Wiese, Bettina S.; Freund, Alexandra M.
2011-01-01
This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…
Review of the proposed Strategic National Plan for Civilian Nuclear Reactor Development: Volume 1
International Nuclear Information System (INIS)
1986-10-01
On August 9, 1985, the Secretary of Energy requested that the Chairman of the Energy Research Advisory Board establish an ad-hoc Panel to review a draft ''Strategic National Plan for Civilian Nuclear Reactor Development.'' The resulting report, approved by the Board, contains suggestions for improving the draft plan and also contains major recommendations for alleviating the several institutional barriers that appear to preclude the construction of any new nuclear power plants in this country
Strategic planning for skills and simulation labs in colleges of nursing.
Gantt, Laura T
2010-01-01
While simulation laboratories for clinical nursing education are predicted to grow, budget cuts may threaten these programs. One of the ways to develop a new lab, as well as to keep an existing one on track, is to develop and regularly update a strategic plan. The process of planning not only helps keep the lab faculty and staff apprised of the challenges to be faced, but it also helps to keep senior level management engaged by reason of the need for their input and approval of the plan. The strategic planning documents drafted by those who supervised the development of the new building and Concepts Integration Labs (CILs) helped guide and orient faculty and other personnel hired to implement the plan and fulfill the vision. As the CILs strategic plan was formalized, the draft plans, including the SWOT analysis, were reviewed to provide historical perspective, stimulate discussion, and to make sure old or potential mistakes were not repeated.
Forced draft wet cooling systems
International Nuclear Information System (INIS)
Daubert, A.; Caudron, L.; Viollet, P.L.
1975-01-01
The disposal of the heat released from a 1000MW power plant needs a natural draft tower of about 130m of diameter at the base, and 170m height, or a cooling system with a draft forced by about forty vans, a hundred meters in diameter, and thirty meters height. The plumes from atmospheric cooling systems form, in terms of fluid mechanics, hot jets in a cross current. They consist in complex flows that must be finely investigated with experimental and computer means. The study, currently being performed at the National Hydraulics Laboratory, shows that as far as the length and height of visible plumes are concerned, the comparison is favorable to some types of forced draft cooling system, for low and medium velocities, (below 5 or 6m/s at 10m height. Beyond these velocities, the forced draft sends the plume up to smaller heights, but the plume is generally more dilute [fr
2011-01-04
...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Draft Environmental Impact Statement (EIS), and Draft Environmental Impact Report (EIR) as a joint environmental analysis document for the Iberdrola Renewable/Pacific Wind Development Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the opening of the comment period on the Draft EIS/EIR.
Draft genome sequence of Agrobacterium rhizogenes strain NCPPB2659
This work reports the draft genome of Agrobacterium rhizogenes strain NCPPB2659 (also known as strain K599). The assembled genome contains 5,277,347 bp, and is composed of 1 circular chromosome, the Ri virulence plasmid, and 17 scaffolds pertaining to the linear chromosome. The wild type strain cau...
Community Solutions for Stormwater Management: A Guide for Voluntary Long-Term Planning
This draft guide describes how to develop a comprehensive long-term community stormwater plan that integrates stormwater management with communities’ broader plans for economic development, infrastructure investment and environmental compliance.
International Nuclear Information System (INIS)
Daily, M.C.; Huffert, A.; Cardile, F.; Malaro, J.C.
1994-08-01
The Nuclear Regulatory Commission's (NRC) regulations in 10 CFR 20 are being amended to include radiological criteria for decommissioning of lands and structures at nuclear facilities. 10 CFR Part 20, Subpart E establishes criteria for the remediation of contaminated sites or facilities that will allow their release for future use with or without restrictions. The criteria include a Total Effective Dose Equivalent (TEDE) limit of 15 mrem/year (0.15 mSv/y) that should not be exceeded by an average individual among those who could potentially receive the greatest exposure from any residual activity within a facility or on a site. The criteria also require a licensee to reduce any residual radioactivity to as-low-as-reasonably-achievable (ALARA) levels. This staff draft guide describes acceptable procedures for determining the predicted dose level (PDL) from any residual radioactivity at the site. It describes the basic features of the calculational models and the associated default assumptions and parameter values the NRC staff would find acceptable in calculating PDLs. Appendices A, B, and C provide numerical values that can be used to estimate the dose from residual radioactivity remaining at a site. Since 10 CFR Part 20, Subpart E introduces several new concepts, definitions and discussions are included in a regulatory position concepts section of the guide to assist licensees in understanding some of the philosophy underlying the rule
Individualism-Collectivism: Links to Occupational Plans and Work Values
Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.
2010-01-01
Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…
Half-liter supernatant sampler system engineering work plan
International Nuclear Information System (INIS)
Ritter, G.A.
1995-01-01
The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task
IRIS Toxicological Review of Ammonia (Revised External Review Draft)
In August 2013, EPA submitted a revised draft IRIS assessment of ammonia to the agency's Science Advisory Board (SAB) and posted this draft on the IRIS website. EPA had previously released a draft of the assessment for public comment, held a public meeting about the draft, and ...
2012-06-21
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-MWR-CUVA-10100; 6065-4000-409] Draft Trail... Park Service, Interior. ACTION: Notice of Availability. SUMMARY: The National Park Service (NPS... blueprint to guide the expansion, elimination, restoration, management, and use of the trail system and its...
Energy Technology Data Exchange (ETDEWEB)
Robert Nourgaliev
2010-02-01
This is an initial draft of a born-assessed VU plan for the RELAP7 (R7) code development effort. The plan will continue to evolve based on the growth of code capability. This growth will be reflected as additional testing is identified and done. Later versions of this document will reflect that growth.
The relationship between the Municipal Master Plan and local Watershed Plans in water management
Directory of Open Access Journals (Sweden)
Denise Gallo Pizella
2015-07-01
Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.
CFD Analysis of The Hydraulic Turbine Draft Tube to Improve System Efficiency
Directory of Open Access Journals (Sweden)
Chakrabarty Spandan
2016-01-01
Full Text Available Demand of the power is increasing day by day with the development of the science and technology. Development of the renewable energy sector has become essential issue at the present situation due to the limited source of the non-renewable energy. Hydro energy power generation sector is superior over the other renewable sector due to the high efficiency, ability to continuous generation and low generation cost. In India a great amount of the power generation is taken care by the hydro power system but still some more potential have unexplored. The efficiency improvement of the hydro turbine system can be done for the new installation or installed system by the improvement in component level. The system can be installed by the state of the art equipment, like modern inlet guide vane (IGV control system, improved design of the runner, IGV system, draft tube, penstock to reduce the loss, hence improve the efficiency. The energy recovery in the draft tube depends on the design of draft tube. In the present work the optimized design of the draft tube shape through computational fluid dynamics (CFD simulation has been carried out in ANSYS FLUENT platform. The design objective of the draft tube is to reduce the flow loss and improve the energy recovery, hence to improve the efficiency.
2010-02-23
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 47740, LLCAD07000, L51030000.FX0000, LVRAB109AA01] Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment...
2012-06-29
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.FX0000, LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement/Environmental Impact Report and Proposed California Desert Conservation Area Plan Amendment, Kern County, CA...
76 FR 43985 - Endangered and Threatened Species; Recovery Plan for the Sei Whale
2011-07-22
... and Threatened Species; Recovery Plan for the Sei Whale AGENCY: National Marine Fisheries Service... review of the draft Recovery Plan (Plan) for the sei whale (Balaenoptera borealis). NMFS is soliciting... recovery plans for each listed species unless such a plan would not promote its recovery. The sei whale has...
Study on optimization of normal plant outage work plan for nuclear power plants
International Nuclear Information System (INIS)
Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo
2011-01-01
This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)
Evaluation of mercury speciation by EPA (Draft) Method 29
Energy Technology Data Exchange (ETDEWEB)
Laudal, D.L.; Heidt, M.K. [Energy & Environmental Research Center, Grand Forks, ND (United States); Nott, B. [Electric Power Research Institute, Palo Alto, CA (United States)
1995-11-01
The 1990 Clean Air Act Amendments require that the U.S. Environmental protection Agency (EPA) assess the health risks associated with mercury emissions. Also, the law requires a separate assessment of health risks posed by the emission of 189 tract chemicals (including mercury) for electric utility steam-generating units. In order to conduct a meaningful assessment of health and environmental effects, we must have, among other things, a reliable and accurate method to measure mercury emissions. In addition, the rate of mercury deposition and the type of control strategies used may depend upon the type of mercury emitted (i.e., whether it is in the oxidized or elemental form). It has been speculated that EPA (Draft) Method 29 can speciate mercury by selective absorption; however, this claim has yet to be proven. The Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) have contracted with the Energy & Environmental Research Center (EERC) at University of North Dakota to evaluate EPA (Draft) Method 29 at the pilot-scale level. The objective of the work is to determine whether EPA (Draft) Method 29 can reliably quantify and speciate mercury in the flue gas from coal-fired boilers.
Okello, Walter O; Muhanguzi, Dennis; MacLeod, Ewan T; Welburn, Susan C; Waiswa, Charles; Shaw, Alexandra P
2015-11-05
A study was conducted in Tororo District in eastern Uganda to assess the socio-economic contribution of draft cattle to rural livelihoods. The aim of the study was to empirically quantify the economic value of draft cattle thus contributing to understanding the impact of endemic parasitic diseases of cattle on livestock productivity and subsequently household income, labor and food security. A total of 205 draft cattle keeping households (n = 205) were randomly selected and structured household questionnaires were administered, focusing on work oxen use, productivity, inputs and outputs. The data obtained was analyzed using standard statistical methods and used to calculate the gross margin from the draft cattle enterprise. Secondary data were obtained from focus group discussions and key informant interviews and these were analyzed using Bayesian methods. The study showed that, apart from being labor saving, the use of animal traction is highly profitable with the gross margin per year from the use of draft cattle amounting to 245 United States dollars per work oxen owning household. The cash obtained from hiring out draft animals was equivalent to nearly a quarter of the average local household's monetary receipts. It also revealed that endemic bovine parasitic diseases such as trypanosomiasis and tick-borne diseases reduced draft cattle output by 20.9 % and potential household income from the use of draft oxen by 32.2 %. The presence of endemic cattle diseases in rural Uganda is adversely affecting the productivity of draft cattle, which in turn affects household income, labor and ultimately food security. This study highlights the contribution of draft cattle to rural livelihoods, thus increasing the expected impact of cost-effective control strategies of endemic production limiting livestock diseases in Uganda.
Technical Support Section annual work plan for FY 1998
Energy Technology Data Exchange (ETDEWEB)
Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.
1997-12-01
The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.
2011-10-05
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2011-N161; 10120-1112-0000-F2] Incidental Take Permit; Auwahi Wind Energy Generation Facility, Maui, HI; Draft Habitat Conservation Plan and..., HI 96850. You may also send comments by facsimile to (808) 792-9580. FOR FURTHER INFORMATION CONTACT...
2010-02-10
... 236; by e-mail at [email protected] ; or on our Web site at www.fws.gov/southwest/es/arizona... designated. The primary threats to the Yuma clapper rail are habitat loss and degradation due to changes in... included in the draft revised recovery plan and include population and habitat monitoring and evaluation...
2013-12-26
... biologics approvals, drug supply chain, and other topics related to human pharmaceuticals. The draft PDUFA V... . Submit written comments to the Division of Dockets Management (HFA-305), Food and Drug Administration....gov or written comments to the Division of Dockets Management (see ADDRESSES). It is only necessary to...
Jovan Hadžić's civil procedure code draft (1845
Directory of Open Access Journals (Sweden)
Stanković Uroš
2013-01-01
Full Text Available The article sheds light on civil procedure code draft prepared by renown Serbian lawmaker Jovan Hadžić in 1845. Contrarily to Hadžić's work on producing civil code, his efforts to write civil procedure code are to a large extent obscure. Original text of the draft has not been found. Therefore, one is imposed to reconstruct it with the aid of auxiliary sources, among which the record kept by the commission tasked with revision of the draft, has prevailing significance. The author made an attempt to determine the structure of the draft, as well as the contents of its provisions as accurately as possible, wherein the remarks that the Commission had made were of most assistance. Hadžić consigned his draft to the Prince Aleksandar Karađorđević on August 4th 1845. The Draft consisted of introduction and three parts. The introduction comprised of general provisions. Therein was stipulated principle of trial by written declaration, determined five kinds of courts before which civil procedure should occur and established vacatio legis. The first and concviningly largest part of the Draft was most likely entitled 'On principal litigations and litigation evidence' ('O parnicama glavnima i parničnim dokazatelstvima'. It included diverse rules, such as proceedings before peace courts, proceedings before district courts, ordinary course of litigation (i. e. rules in terms of filing a complaint, scheduling of hearings, subpoenas delivery, procurement of evidence, trial, bankruptcy proceedings, forms of evidence, presentation of evidence and deliberation of judgment, appellate procedure, new trial and enforcement procedure. The third part subsumed the title named 'likvidacija' (literally 'liquidation', whose contents is undeterminable on the basis of existing text of the draft, resolution of bankruptcy proceedings via settlement, resolution of regular litigations via settlement, title named 'on special proceedings and advantages' ('o osobenom
Energy Technology Data Exchange (ETDEWEB)
NONE
1991-09-01
The Department of Energy`s Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs.
International Nuclear Information System (INIS)
1991-09-01
The Department of Energy's Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation's spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs
Draft User Functionalities and Interfaces of PN Services (Low-Fi Prototyping)
DEFF Research Database (Denmark)
Karamolegkos, P.; Larsen, J. E.; Larsen, Lars Bo
2006-01-01
Internal report of WP1 Task 4 activities from January 2006 to August 2006. This report describes the draft user functionalities and coming user interfaces for PN services. It is a working document to be handed over to WP1 Task1 and Task3 for guidelines on specification. State of the art usability...... and user experience, conceptual design work on the two pilot services, MAGNET.CARE and Nomadic@Work, is described....
2013-02-26
...The Bureau of Reclamation has made available for public review and comment the draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The California Tahoe Conservancy and the Tahoe Regional Planning Agency, the other lead agencies for the Project, made the EIR/EIS/EIS available to the public on February 8, 2013.
The Role of Working Memory in Planning and Generating Written Sentences
Directory of Open Access Journals (Sweden)
Ronald T. Kellogg
2016-02-01
Full Text Available Planning a sentence with concrete concepts whose referents can be mentally imaged has been shown in past work to require the limited resources of visual working memory. By contrast, grammatically encoding such concepts as lexical items in a syntactic structure requires verbal working memory. We report an experiment designed to demonstrate a double dissociation of these two stores of working memory by manipulating the difficulty of (1 planning by comparing related concepts to unrelated concepts and (2 grammatical encoding of an English sentence in active voice versus the more complex structure of the passive voice. College students (N = 46 composed sentences that were to include two noun prompts (related versus unrelated while concurrently performing either a visual or a verbal distracting task. Instructions to produce either active or passive sentences were manipulated between groups. The results surprisingly indicated that the supposedly easier planning with related concepts made a large demand on verbal working memory, rather than unrelated concepts demanding more visual working memory. The temporal dynamics of the sentence production process appear to best account for the unexpected findings.
2013-03-22
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9792-9] Draft Guidance for E85 Flexible Fuel Vehicle... draft EPA guidance to auto manufacturers for weighting the greenhouse gas (GHG) emissions of a flexible... all federal government work days from 8:30 a.m. to 4:30 p.m.; generally, it is open Monday through...
2011-07-22
... this authority would be effective only for a period of up to 2 years, without the possibility of... Snake River Conservation District, Medicine Bow Conservation District, Carbon County, and the City of... planning alternatives for the public lands administered by the BLM Rawlins Field Office within the planning...
Cluster: Drafting. Course: Introduction to Technical Drafting.
Sanford - Lee County Schools, NC.
The set of 10 units is designed for use with an instructor as an introduction to technical drafting, and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: drafting…
19 CFR 207.63 - Circulation of draft questionnaires.
2010-04-01
... 19 Customs Duties 3 2010-04-01 2010-04-01 false Circulation of draft questionnaires. 207.63... SUBSIDIZED EXPORTS TO THE UNITED STATES Five-Year Reviews § 207.63 Circulation of draft questionnaires. (a) The Director shall circulate draft questionnaires to the parties for comment in each full review. (b...
10 CFR 51.81 - Distribution of draft environmental impact statement.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.86 - Distribution of draft environmental impact statement.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
The Physics of Bump Drafting in Car Racing
Fiolhais, Miguel C. N.; Amor dos Santos, Susana
2014-01-01
The technique of bump drafting, also known as two-car drafting in motorsports, is analysed in the framework of Newtonian mechanics and simple aerodynamic drag forces. As an apparent unnatural effect that often pleases the enthusiasts of car racing, bump drafting provides a unique pedagogical opportunity for students to gain insights into the…
Wind turbine certification - the committee draft by IEC-TC88-WG9
Energy Technology Data Exchange (ETDEWEB)
Hauge Madsen, P [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark)
1999-03-01
In 1995 the Technical Committee TC88 of the International Electrotechnical Commission decided to start a new work item, namely to prepare a standard for the certification procedures for wind turbines with respect to safety, performance, interaction with the public grid, environmental requirements and the documentation requested by the certification bodies. The purpose was to provide a common basis for certification of wind turbines, including a basis for accreditation of certification bodies and mutual recognition of certificates. A working group (WG9) was created to prepare a committee draft. WG9 submitted the result late in 1998 to TC88. This paper presents the committee draft Standard, which defines a certification system for Wind Turbine Generator Systems. Key issues in the evaluation of conformity with these standards and identified needs for other technical criteria and procedures are presented. (au) 10 refs.
Materials for the WIIN Strategic Plan
EPA will also be hosting a webinar on March 23, 2017 to review a draft strategic plan that identifies roles and responsibilities for EPA, states and PWS under the requirements of WIIN. EPA will also be hosting a follow up webinar in May.
The LHC Luminosity Upgrade and Related ATLAS Detector Plans
Hartjes, F; The ATLAS collaboration
2009-01-01
3rd draft of the proposed talk about Atlas Upgrade for MPGD2009 (Instrumentation conference on gaseous pixel detectors) on Friday June 12, 2009. I concentrated my presentation on the upgrade plans and schedule of the LHC and on detector technologies for the new Inner Tracker, putting less emphasis on other subdetectors. Compared to the 2nd draft I modified and clarified a few items about trigger, muon detection and calorimetry and did a number of cosmetic adaptions.
10 CFR 51.80 - Draft environmental impact statement-materials license.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
Improvement of hydro-turbine draft tube efficiency using vortex generator
Directory of Open Access Journals (Sweden)
Xiaoqing Tian
2015-07-01
Full Text Available Computational fluid dynamics simulation was employed in a hydraulic turbine (from inlet tube to draft tube. The calculated turbine efficiencies were compared with measured results, and the relative error is 1.12%. In order to improve the efficiency of the hydraulic turbine, 15 kinds of vortex generators were installed at the vortex development section of the draft tube, and all of them were simulated using the same method. Based on the turbine efficiencies, distribution of streamlines, velocities, and pressures in the draft tube, an optimal draft tube was found, which can increase the efficiency of this hydraulic turbine more than 1.5%. The efficiency of turbine with the optimal draft tube, draft tube with four pairs of middle-sized vortex generator, and draft tube without vortex generator under different heads of turbine (5–14 m was calculated, and it was verified that these two kinds of draft tubes can increase the efficiency of this turbine in every situation.
Orientation, Sketching, Mechanical Drawing, Drafting--Basic: 9253.01.
Dade County Public Schools, Miami, FL.
The course introduces the student to the drafting trade, freehand sketching, and basic mechanical drawing. The course has no prerequisites and will guide the student into drafting concepts and serve as a foundation for further study in vocational drafting. Requiring a total of 45 class hours, eight hours are utilized in orientation, 15 hours are…
Optimum Drafting Conditions Of Polyester And Viscose Blend Yarns
Directory of Open Access Journals (Sweden)
Hatamvand Mohammad
2017-09-01
Full Text Available In this study, we used an experimental design to investigate the influence of the total draft, break draft, distance between the aprons (Clips and production roller pressure on yarn quality in order to obtain optimum drafting conditions for polyester and viscose (PES/CV blend yarns in ring spinning frame. We used PES fibers (1.4 dtex × 38 mm long and CV fibers (1.6 dtex × 38 mm long to spin a 20 Tex blend yarn of PES (70%/CV (30% blend ratio. When the break draft, adjustment of distance between of aprons and roller pressure is not reasonable, controlling and leading of the fibers is not sufficient for proper orientation of the fibers in the yarn structure to produce a high quality yarn. Experimental results and statistical analysis show that the best yarn quality will be obtained under drafting conditions total draft of 38, 1.2 break draft, 2.8 mm distance between of aprons and maximum pressure of the production top roller (18daN.
International Nuclear Information System (INIS)
1994-01-01
This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams
Draft project management update to the Iowa DOT Project Development Manual : final report.
2016-08-01
This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...
Working memory and planning during sentence production.
Martin, Randi C; Yan, Hao; Schnur, Tatiana T
2014-10-01
Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.
Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan
International Nuclear Information System (INIS)
1995-06-01
This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process
10 CFR 51.85 - Draft environmental impact statement-rulemaking.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-rulemaking. 51.85... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact... Commission has determined to prepare an environmental impact statement. ...
How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.
Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H
2018-06-12
To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout
Dorożyński, Tomasz; Urbaniak, Wojciech
2016-01-01
Running a business on an international scale requires not only a substantial body of knowledge but also the ability to apply it in practice. That is why our textbook, with a vast collection of practical examples, discusses a wide variety of pertinent issues connected with business operations in international markets, from international market analysis, drafting business plans, concluding business transactions and the insurance of goods through to customs clearance procedures and professional ...
Energy Technology Data Exchange (ETDEWEB)
2010-09-15
Draft implementation plan for a common Nordic Retail Market was developed in close cooperation with relevant stakeholders in the Nordic electricity market during winter and spring 2010. The implementation plan outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. NordREG organised a public consultation on the draft implementation plan from the end of June until the beginning of the August, 2010 and received 25 responses from stakeholders. This evaluation report includes summary of stakeholders' responses and NordREG comments on stakeholders' views. The evaluation of the responses has been taken into account during the finalization of the implementation plan
Environmental Restoration Remedial Actions Program Field Office Work Plan
International Nuclear Information System (INIS)
1989-02-01
The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs
Plug-in hybrid electric vehicle R&D plan
Energy Technology Data Exchange (ETDEWEB)
None, None
2007-06-01
FCVT, in consultation with industry and other appropriate DOE offices, developed the Draft Plug-In Hybrid Electric Vehicle R&D Plan to accelerate the development and deployment of technologies critical for plug-in hybrid vehicles.
Assessing risk of draft survey by AHP method
Xu, Guangcheng; Zhao, Kuimin; Zuo, Zhaoying; Liu, Gang; Jian, Binguo; Lin, Yan; Fan, Yukun; Wang, Fei
2018-04-01
The paper assesses the risks of vessel floating in the seawater for draft survey by using the analytic hierarchy process. On this basis, the paper established draft survey risk index from the view of draft reading, ballast water, fresh water, and calculation process and so on. Then the paper proposes the method to deal with risk assessment using one concrete sample.
Comparative study on thermal performance of natural draft cooling towers with finned shells
International Nuclear Information System (INIS)
Goodarzi, Mohsen
2016-01-01
The cooling efficiency of natural draft cooling towers under crosswind condition should be improved. In the present research work three different externally finned shells were considered for a typical natural draft cooling tower to investigate the cooling improvement. They were numerically simulated under normal and crosswind conditions. Numerical results show that twisting four fin plates over the tower shell along the 45 peripheral angle, could improve the cooling efficiency up to 6.5 %. Because of the periodic shape of the fin plates, the cooling efficiency of the cooling tower with finned shell is less sensitive to the change of wind.
Comparative study on thermal performance of natural draft cooling towers with finned shells
Energy Technology Data Exchange (ETDEWEB)
Goodarzi, Mohsen [Bu-Ali Sina Univ., Hamedan (Iran, Islamic Republic of). Dept. of Mechanical Engineering
2016-10-15
The cooling efficiency of natural draft cooling towers under crosswind condition should be improved. In the present research work three different externally finned shells were considered for a typical natural draft cooling tower to investigate the cooling improvement. They were numerically simulated under normal and crosswind conditions. Numerical results show that twisting four fin plates over the tower shell along the 45 peripheral angle, could improve the cooling efficiency up to 6.5 %. Because of the periodic shape of the fin plates, the cooling efficiency of the cooling tower with finned shell is less sensitive to the change of wind.
The draft common frame of reference (DCFR) : A giant with feet of clay
Chirico, F.; van Damme, E.E.C.; Larouche, P.; Larouche, P.; Cserne, P.
2013-01-01
This chapter summarizes the lessons drawn from the work of the Economic Impact Group (EIG), a part of the CoPECL Network of Excellence funded by the EU to prepare a Draft Common Frame of Reference (DCFR). First, it revisits basic principles which are central to the work of the whole group. For one,
2010-06-21
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 49537, LLCAD08000, L51030000.FX0000, LVRAB109AA02] Notice of Correction to Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment to the California Desert Conservation Area Plan for the Calico Solar (Formerly SES Solar One...
2011-07-08
... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...: For further information and/or to have your name added to our mailing list, contact Cedric Perry, BLM...
On the Drafting of Confidentiality Agreements
DEFF Research Database (Denmark)
Drewsen, Merete; Lando, Henrik; Cummins, Tim
2006-01-01
This is not a theoretical paper but an application of existing law and economic contract theory to the issue of how to draft a specific kind of contract. It is addressed to practitioners and is intended for practical use. It will be part of a Wiki (as in Wikipedia) for contract drafting, which...
Remedial Action Plan for Expanded Bioventing System Facility 6454
National Research Council Canada - National Science Library
1996-01-01
This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...
Senior dental students' career intentions, work-life balance and retirement plans.
Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D
2007-09-08
To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p work full time. Although the majority (65%) intend to work in general practice significant numbers (19%) wish to have a career in hospital dentistry and very few (3%) in community dentistry. Senior students seem to show no more commitment to the NHS than those in our previous study of dental school applicants. Only 3% intend to work exclusively for the NHS and 18% intend to work exclusively in the private sector. Surprising numbers had plans to retire or go part time before 60 years of age. Only 20% of the sample intended to continue working full time after the age of 60 years. The mode age that those surveyed intended to start a family was 30 years and a large majority of both sexes thought this would interrupt their professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.
Action plan for energy efficiency 2003-2006. A Working Group Proposal
International Nuclear Information System (INIS)
2003-02-01
The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are
10 CFR 51.70 - Draft environmental impact statement-general.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...
10 CFR 51.71 - Draft environmental impact statement-contents.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-contents. 51.71... Implementing Section 102(2) Environmental Impact Statements § 51.71 Draft environmental impact statement—contents. (a) Scope. The draft environmental impact statement will be prepared in accordance with the scope...
Accuracy of professional sports drafts in predicting career potential.
Koz, D; Fraser-Thomas, J; Baker, J
2012-08-01
The forecasting of talented players is a crucial aspect of building a successful sports franchise and professional sports invest significant resources in making player choices in sport drafts. The current study examined the relationship between career performance (i.e. games played) and draft round for the National Football League, National Hockey League, National Basketball League, and Major League Baseball for players drafted from 1980 to 1989 (n = 4874) against the assumption of a linear relationship between performance and draft round (i.e. that players with the most potential will be selected before players of lower potential). A two-step analysis revealed significant differences in games played across draft rounds (step 1) and a significant negative relationship between draft round and games played (step 2); however, the amount of variance accounted for was relatively low (less than 17%). Results highlight the challenges of accurately evaluating amateur talent. © 2011 John Wiley & Sons A/S.
2010-09-23
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Solicitation of Written Comments on Draft Tier 2 Strategies/ Modules for Inclusion in the ``HHS Action Plan to Prevent Healthcare- Associated Infections'' AGENCY: Department of Health and Human Services, Office of the Assistant Secretary for Health, Office of...
Cluster: Drafting. Course: Basic Technical Drafting. Research Project.
Sanford - Lee County Schools, NC.
The set of six units is designed for use with an instructor in basic technical drafting and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: pictorial drawing; screw…
77 FR 30509 - Fiscal Year 2012 Draft Work Plan
2012-05-23
... was not carried out. Several factors contributed to this including continuing resolutions (CRs) passed... governed by the following general principles: In FY 2012 no project specific earmarks were directed. The..., designated as ``up to'' may be reassigned to the Legacy Energy Program, Bulk Fuel and Rural Power System...
77 FR 67635 - Fiscal Year 2013 Draft Work Plan
2012-11-13
... received federal funding from several sources. These fund sources are governed by the following general... source for program components. Subtotal of Program Funding: These are the figures that appear in rows entitled ``subtotal'' and are the subtotals of all program funding within a given fund source. The subtotal...
In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s sco...
Stuart oil shale project stage two: executive summary: draft environmental impact statement
International Nuclear Information System (INIS)
1999-09-01
The project is an oil shale open pit mine and processing operation that is currently being commissioned 15 km north of Gladstone, Queensland, Australia, and is owned as a joint venture by Southern Pacific Petroleum N.L., Central Pacific Minerals N.L, and Suncor Energy Inc., a leading Canadian company that is an integrated energy company. The results of a comprehensive investigation are included of the potential environmental impacts of the project, and which are described in the Draft Environmental Impact Statement (EIS). In stage two, there is included the existing mine expansion as well as the construction of an additional process plant based around a larger commercial scale ATP oil shale processing plant. The new stage two operation will be developed next to and integral with services and infrastructure provided for stage one. Described are: the assessment process, regulatory framework and the project area, the needs for an alternative to the project, the proposal itself, the existing natural, social and economic impacts, and the environmental impacts as well as plans for their mitigation. In appendices there are included a draft environmental management overview strategy and an environmental management plan. The elements covered in the report by section are: background, need for the project, the proponent, legislation and approvals, project description, environmental issues and impact management
75 FR 4400 - Draft Guidance for Industry on Assessment of Abuse Potential of Drugs; Availability
2010-01-27
... draft guidance before it begins work on the final version of the guidance, submit written or electronic..., prescribing, advertising, manufacturing, promotion, marketing, and use in the practice of medicine. Not...
Housing, health and master planning: rules of engagement.
Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P
2014-04-01
Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.
Integrating ALARA into work planning and organization
International Nuclear Information System (INIS)
Croft, J.R.; Robb, J.D.
1993-01-01
This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs
International Nuclear Information System (INIS)
Pentecost, E.D.; Vinikour, W.S.
1993-08-01
This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods
Energy Technology Data Exchange (ETDEWEB)
NONE
1999-03-01
For thermal power plants in Maritime Province of Russia, a repair plan for effective reduction of emission of greenhouse effect gas was worked out as a draft plan for the joint execution. The project is to be implemented for the additional installation/replacement of boilers at Vladivostok No. 2 power plant, construction of a power plant as a substitute for Partizansk power plant, and new construction of Ussuriisk power plant. The draft plan includes the new installation of two gas-fired boilers/replacement of existing boilers at Vladivostok No. 2 power plant, construction of 200MW cogeneration facility at Partizansk power plant, construction of 180MW cogeneration facility at Ussuriisk power plant, abolition of small-sized boiler station, etc. The reduction amount of the greenhouse effect gas emission based on this repair plan totaled 338 million tons in project. The effect against cost is US$ 4.75 per 1 CO2 ton at Vladivostok. (NEDO)
International Nuclear Information System (INIS)
1981-03-01
This staff supplement to Draft Report NUREG/CR-1580, Human Engineering Guide to Control Room Evaluation, provides staff responses to comments on the draft report and supplemental material not provided in the draft report. The supplemental material includes new draft guidelines for the systems review of nuclear power plant control rooms and sample checklists and corresponding human engineering guidelines
Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan
International Nuclear Information System (INIS)
Nielsen, T.; Waage, E.; Miller, D.
1990-01-01
This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes
2010-07-28
... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...
International Nuclear Information System (INIS)
Thomauske, B.
2008-01-01
The German Federal Ministry for the Environment, Nature Conservation, and Nuclear Safety (BMU) on August 12, 2008 published a July 29, 2008 draft of the ''Safety Requirements to Be Met in Final Storage of Heat-producing Radioactive Waste.'' As announced by the BMU, these safety requirements are to bring up to the state of the art the safety criteria of 1983. Over a couple of years, efforts had been made to adapt the criteria to the internationally accepted standard as demanded by the Advisory Committees on Reactor Safeguards (RSK) and Radiation Protection (SSK). The main changes made by the BMU are the introduction of a phased procedure in building repositories. A phased plans approval procedure under the Atomic Energy Act has been foreseen by the Ministry for this purpose. In addition, the draft provides for the introduction of a risk-based goal of protection. To ensure retrievability of the waste, the casks are to have a demonstrated service life of 500 years. The BMU draft safety requirements are unable to bring the safety criteria of 1983 up to the current state of the art. Here are the key points of criticism: - A risk-based goal of protection is introduced. The yardstick to be applied is to be defined in a guideline yet to be elaborated. As a consequence, the draft lacks substance. - As in licensing of nuclear facilities, the licensing procedure provides for a phased plans approval procedure for exploration. This analogy does not exist, as exploration is not the first phase of the plant to be built but a measure which is a precondition for obtaining a permit for construction and operation. - The information contained in the draft indicates that, contrary to international recommendations, it tightens the goal of protection by more than one order of magnitude. - The requirements to be met by the casks because of retrievability impose constraints on solutions optimized for safety in emplacement technology. - The risk-based approach is not mature and is
Participatory planning intercultural: Reflections for social work
Directory of Open Access Journals (Sweden)
Esperanza Gómez Hernández
2012-01-01
Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.
Mindell, J; Sheridan, L; Joffe, M; Samson-Barry, H; Atkinson, S
2004-03-01
To increase the positive and mitigate the negative health impacts of the mayor's draft transport strategy for London. A rapid prospective health impact assessment (HIA) of the penultimate draft of the strategy, using a review commissioned by the regional director of public health; an appraisal of congestion charging; and a participatory workshop. Two audits of changes were performed to assess the impact on policy of the HIA process. Regional government policy development. Recommendations from the rapid HIA were fed back into the drafting process. Changes (a) between the penultimate draft and the draft for public consultation and (b) between that and the final mayoral strategy. The draft transport strategy published for consultation differed in a number of respects from the previous version. Almost all the recommendations from the HIA were incorporated into the final strategy. Significant changes included promoting sustainable travel plans for workplaces and schools; giving priority to infrastructure and services that benefit London's deprived communities; increased emphasis on promoting walking and cycling and reducing reliance on private cars; and a commitment to track the health impacts of the final strategy and its implementation. Specific additions included re-allocating road space. HIA was successful in influencing the transport strategy for London, resulting in several improvements from a health viewpoint. HIA is an effective method both for bringing about significant change in policy proposals and in increasing policy makers' understanding of determinants of health and hence in changing attitudes of policy makers.
IRIS Toxicological Review of Methanol (Noncancer) (Interagency Science Discussion Draft)
On May 3, 2013, the Toxicological Review of Methanol (noncancer) (Revised External Review Draft) was posted for public review and comment. Subsequently, the draft Toxicological Review, Appendices, and draft IRIS Summary were reviewed internally by EPA and by other federal agenci...
India's draft nuclear doctrine
International Nuclear Information System (INIS)
Kapur, A.
2000-01-01
India's draft nuclear doctrine and its nuclear and missile testing are a response to recent international, regional and domestic developments. Nehru's policy of nuclear disarmament, non-discriminatory international arrangements and unilateral restraint has been overturned in favour of self-reliant security and negotiated nuclear restraints. The draft nuclear doctrine is aimed at transparency and formalization of existing capacities. It is anchored in the United Nations Charter, based on the legitimacy of self-defence and espouses minimum nuclear deterrence. After the launching of Pokhran II, the debate in India has been settled on weaponization and deployment. The doctrine is not country-specific with respect to threat perceptions, but the author posits that the long-term focus is on China and the short-term on Pakistan. The doctrine emphasizes civilian command and control. India's decision to test incurred diplomatic and other economic costs, but afforded new opportunities for the country to assert itself militarily and politically in Asia and in the world. There were no diplomatic costs in issuing the draft nuclear doctrine, but the author estimates the economic costs of a full-blown (triad) Indian nuclear deterrent. (author)
Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)
International Nuclear Information System (INIS)
Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.
1990-06-01
As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations
International Nuclear Information System (INIS)
Moos, L. P.; Ditmars, J. D.; Heston, S. L.; Granzen, G. A.; Holzemer, M. J.; Bennett, D. B.
2003-01-01
This paper describes a pilot study that resulted in the generation of draft planning documents for the upcoming transition from remediation construction to long-term stewardship at three national laboratories managed by the U.S. Department of Energy (DOE)-Chicago Operations Office (CH). The remediation construction work at these facilities is being completed under the DOE's Office of Environmental Management (EM) Program. Once the remediation is complete, the responsibility for long-term stewardship (LTS) of the closed waste sites is expected to be transferred to the DOE organization responsible for managing each of the three facilities (i.e., the site landlord). To prepare for this transfer, an extensive planning effort is required. This pilot study utilized the DOE guidance in effect at the time to (1) develop a series of documents identifying applicable requirements that the LTS Programs will need to satisfy, issues that need to be resolved before the transfer can proceed, and criteria to be used to determine when active remediation is complete and a given site is ready for transfer to the LTS Program; (2) examine alternate structures for possible LTS Programs; and (3) develop draft LTS Implementation Plans. This advanced planning effort yielded a number of observations and lessons learned that are applicable to any facility approaching the end of its remediation construction phase
2012-11-05
... NCPC review required by law. The new Federal Urban Design Element provides policies that will guide the... public comment a draft new Federal Urban Design Element and draft revisions to the Preservation and... Features Element articulates policies that guide federal actions preserving Washington's historic character...
In Brief: Geoengineering draft statement
Showstack, Randy
2009-04-01
The American Meteorological Society (AMS) has prepared a draft policy statement on geoengineering the climate system, which the AMS Council is considering for approval. The statement notes, “Geoengineering will not substitute for either aggressive mitigation or proactive adaptation. It could contribute to a comprehensive risk management strategy to slow climate change and alleviate its negative impacts, but the potential for adverse and unintended consequences implies a need for adequate research, appropriate regulation, and transparent consideration.” The statement, if adopted, indicates that AMS recommends enhanced research on the scientific and technological potential for geoengineering the climate system; additional study of the historical, ethical, legal, political, and societal aspects of the geoengineering issues; and the development and analysis of policy options to promote transparency and international cooperation in exploring geoengineering options along with restrictions on reckless efforts to manipulate the climate system. AMS is accepting comments on the draft statement until 23 April. For more information, visit http://ametsoc.org/policy/draftstatements/index.html#draft.
Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning
Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.
2016-01-01
Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…
Economic-mathematical model of planning construction-installation work for automation in drilling
Energy Technology Data Exchange (ETDEWEB)
Tsay, L K
1979-01-01
The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.
International Nuclear Information System (INIS)
1995-01-01
ITER Task No. 8, Vacuum Vessel Fabrication Plan and Cost Study (D68), was initiated to assess ITER vacuum vessel fabrication, assembly, and cost. The industrial team of Raytheon Engineers ampersand Constructors and Chicago Bridge ampersand Iron (Raytheon/CB ampersand I) reviewed the current vessel basis and prepared a manufacturing plan, assembly plan, and cost estimate commensurate with the present design. The guidance for the Raytheon/CB ampersand I assessment activities was prepared by the ITER Garching Work Site. This guidance provided in the form of work descriptions, sketches, drawings, and costing guidelines for each of the presently identified vacuum vessel Work Breakdown Structure (WBS) elements was compiled in ITER Garching Joint Work Site Memo (Draft No. 9 - G 15 MD 01 94-17-05 W 1). A copy of this document is provided as Appendix 1 to this report. Additional information and clarifications required for the Raytheon/CB ampersand I assessments were coordinated through the US Home Team (USHT) and its technical representative. Design details considered essential to the Task 8 assessments but not available from the ITER Joint Central Team (JCT) were generated by Raytheon/CB ampersand I and documented accordingly
International Nuclear Information System (INIS)
1993-04-01
The Draft Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales (Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)). The document includes the purpose and background of the proposed actions, the alternatives, the description of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities
10 CFR 51.77 - Distribution of draft environmental impact statement.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...
Energy Technology Data Exchange (ETDEWEB)
1994-03-01
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.
International Nuclear Information System (INIS)
1994-03-01
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow
The Impact of Law and Lawyers on Operations and Planning
National Research Council Canada - National Science Library
Hollingshead, Christopher M
2007-01-01
.... It is important for the SJA to fully participate in the development of plans, guidance, and ROE, but it is the commander's responsibility to ensure that these documents do not become so over drafted...
48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.
2010-10-01
..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...
Debate on the Draft--Helping Students Decide Where They Stand.
Victory, James
1981-01-01
Presents four exercises to help secondary school social studies students understand the complex issues of the draft. Students participate in a mock draft lottery, analyze Phil Och's Draft Dodger Rag, examine how individual experiences affect attitudes, and compare writings by Bill Mauldin and Ron Kovic. (KC)
Report of ITER Special Working Group 2
International Nuclear Information System (INIS)
Roberts, M.
1994-01-01
ITER Special Working Group 2 (SWG-2) was established by the terms of the ITER-EDA Agreement. According to that agreement, open-quotes SWG-2 shall submit guidelines for implementation of task assignments by the Home Teams to the Council for approval at its second meeting. This SWG shall also draft Protocol 2 to the ITER-EDA Agreement and submit a draft to the Council not later than by 21 May 1993.close quotes The members of SWG-2 for Protocol 2 drafting are listed. The rest of this paper is the verbatim report of SWG-2 on Protocol 2
Engineering and planning for decommissioning of nuclear power plants
International Nuclear Information System (INIS)
Gans, G.M. Jr.
1982-01-01
With the publication of NUREG-0586, ''Draft Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities'' in January, 1981 the Nuclear Regulatory Commission staff has put the industry on notice that the termination of operating licenses and the final disposal of physical facilities will require the early consideration of several options and approaches and the preparation of comprehensive engineering and planning documents for the selected option at the end of useful life. This paper opens with a discussion of the options available and the principal aspects of decommissioning. The major emphasis of the composition is the nature of documents, the general approach to be followed, and special considerations to be taken into account when performing the detailed engineering and planning for decommissioning, as the end of life approaches and actual physical disposal is imminent. The author's main point of reference is on-going work by Burns and Roe, with Nuclear Energy Services, under contract to the Department of Energy's Richland Office, to perform the engineering and planning for the decommissioning of the Shippingport Atomic Power Station in Pennsylvania
Directory of Open Access Journals (Sweden)
Manuel Albarrán-Santiago
2015-01-01
Full Text Available This research project revolves around the properties of text linguistics under a qualitative approach. The author analyzed drafts of a research paper by two university students as well as lesson plans and textbooks of high school Spanish Language and Literature courses and lesson plans of courses from the Licentiate degree in Education. According to the information from the drafts, students struggle with coherence and cohesion in writing; however, they succeed in choosing the correct language for the type of writing. Difficulties are most likely due to fact that this topic is not included in secondary education plans and is not commonly addressed in textbooks or university classes. In conclusion, teachers should include the properties of text linguistics in their lesson plans in order to help students overcome these difficulties.
Bergström, Jessica; Miller, Michael; Horneij, Eva
2015-01-01
A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.
10 CFR 51.73 - Request for comments on draft environmental impact statement.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Request for comments on draft environmental impact...-Regulations Implementing Section 102(2) Environmental Impact Statements § 51.73 Request for comments on draft environmental impact statement. Each draft environmental impact statement and each supplement to a draft...
46 CFR 169.755 - Draft marks and draft indicating systems.
2010-10-01
... Section 169.755 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Vessel Control, Miscellaneous Systems, and Equipment Markings § 169.755 Draft marks and... projections of the marks onto a vertical plane are of uniform height equal to the vertical spacing between...
10 CFR 51.72 - Supplement to draft environmental impact statement.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...
Performance Recovery of Natural Draft Dry Cooling Systems by Combined Air Leading Strategies
Directory of Open Access Journals (Sweden)
Weijia Wang
2017-12-01
Full Text Available The cooling efficiency of natural draft dry cooling system (NDDCS are vulnerable to ambient winds, so the implementation of measures against the wind effects is of great importance. This work presents the combined air leading strategies to recover the flow and heat transfer performances of NDDCS. Following the energy balance among the exhaust steam, circulating water, and cooling air, numerical models of natural draft dry cooling systems with the combined air leading strategies are developed. The cooling air streamlines, volume effectiveness, thermal efficiency and outlet water temperature for each cooling delta of the large-scale heat exchanger are obtained. The overall volume effectiveness, average outlet water temperature of NDDCS and steam turbine back pressure are calculated. The results show that with the air leading strategies inside or outside the dry-cooling tower, the thermo-flow performances of natural draft dry cooling system are improved under all wind conditions. The combined inner and outer air leading strategies are superior to other single strategy in the performance recovery, thus can be recommended for NDDCS in power generating units.
Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.
Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao
2018-03-01
To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.
Cesium legacy safety project management work plan
International Nuclear Information System (INIS)
Durham, J.S.
1998-01-01
This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)
Increasing draft capability for retrofit flue gas desulfurization systems
International Nuclear Information System (INIS)
Petersen, R.D.; Basel, B.E.; Mosier, R.J.
1992-01-01
The retrofit installation of flue gas desulfurization (FGD) systems results in significantly higher draft losses for existing generating stations. Consequently, the means for increasing draft capability must be included in many FGD retrofit projects. Consideration is given to several alternatives for increasing draft capability. Alternatives are developed for new induced draft (ID) fans to replace the existing ID fans and for new booster fans to supplement the existing ID fans. Both centrifugal and axial fans are evaluated, as are different means of fan volume control. Each alternative is evaluated on the basis of technical merit and economics. Presented are the development of fan alternatives and results of the technical and economic evaluations
A draft plan for the routine production of PZC based 99mTc generator in the Vietnam
International Nuclear Information System (INIS)
Duong Van Dong
2007-01-01
This is an outline of the radioisotope production programme using a research reactor of 500 kW in Vietnam. Under the framework of Forum for Nuclear Cooperation in Asia (FNCA) cooperation program, the PZC based technology for production of 99m Tc-generator has been studied at Dalat Nuclear Research Institute (DNRI) as well as FNCA members countries in the past several years. The FNCA project has shown the feasibility of using a PZC column-reactor 99 Mo- 99m Tc-generator for commercial applications, citing mainly the cheaper cost of the PZC generator than the imported alumina column-fission 99 Mo generator and excellent technology achievement has been established and optimized by close cooperation between FNCA country members and KAKEN, JAERI. DNRI proposes in this draft business plan, the commercial production of PZC generator through the establishment of national project stage 2006-2008 for the routine production of 99 Mo- 99m Tc generator. In this national project the 99m Tc-generator will use PZC coming from KAKEN - Japan or locally synthesis as the column material, 99 Mo sourced from neighboring countries or irradiated at or reactor and the semi-automatic loading and adsorption machine will be studied, designed and installed in the hot cells available. Because the DNRI have facility 99m Tc-generator production line with two hot cells used production of the 99m Tc generator by using fission 99 Mo. The generator assembly will be designed and fabricated. (author)
Remarks of the SFRP working group about ICRP recommendations
International Nuclear Information System (INIS)
Schieber, C.; Cordoliani, Y.S.
2005-01-01
Remarks of the SFRP working group about ICRP recommendations. The International Commission on Radiological Protection has proposed last summer on its Web site the draft text of the 2005 ICRP recommendations for consultation. As it was done for the previous drafts, the French Society for Radiation Protection, has sent his comments to the ICRP, through a specific working group. The text sent to the ICRP is presented here to the readers of the SFRP's Journal. (author)
Salt Repository Project Waste Package Program Plan: Draft
International Nuclear Information System (INIS)
Carr, J.A.; Cunnane, J.C.
1986-01-01
Under the direction of the Office of Civilian Radioactive Waste Management (OCRWM) created within the DOE by direction of the Nuclear Waste Policy Act of 1982 (NWPA), the mission of the Salt Repository Project (SRP) is to provide for the development of a candidate salt repository for disposal of high-level radioactive waste (HLW) and spent reactor fuel in a manner that fully protects the health and safety of the public and the quality of the environment. In consideration of the program needs and requirements discussed above, the SRP has decided to develop and issue this SRP Waste Package Program Plan. This document is intended to outline how the SRP plans to develop the waste package design and to show, with reasonable assurance, that the developed design will satisfy applicable requirements/performance objectives. 44 refs., 16 figs., 16 tabs
CFD based draft tube hydraulic design optimization
International Nuclear Information System (INIS)
McNabb, J; Murry, N; Mullins, B F; Devals, C; Kyriacou, S A
2014-01-01
The draft tube design of a hydraulic turbine, particularly in low to medium head applications, plays an important role in determining the efficiency and power characteristics of the overall machine, since an important proportion of the available energy, being in kinetic form leaving the runner, needs to be recovered by the draft tube into static head. For large units, these efficiency and power characteristics can equate to large sums of money when considering the anticipated selling price of the energy produced over the machine's life-cycle. This same draft tube design is also a key factor in determining the overall civil costs of the powerhouse, primarily in excavation and concreting, which can amount to similar orders of magnitude as the price of the energy produced. Therefore, there is a need to find the optimum compromise between these two conflicting requirements. In this paper, an elaborate approach is described for dealing with this optimization problem. First, the draft tube's detailed geometry is defined as a function of a comprehensive set of design parameters (about 20 of which a subset is allowed to vary during the optimization process) and are then used in a non-uniform rational B-spline based geometric modeller to fully define the wetted surfaces geometry. Since the performance of the draft tube is largely governed by 3D viscous effects, such as boundary layer separation from the walls and swirling flow characteristics, which in turn governs the portion of the available kinetic energy which will be converted into pressure, a full 3D meshing and Navier-Stokes analysis is performed for each design. What makes this even more challenging is the fact that the inlet velocity distribution to the draft tube is governed by the runner at each of the various operating conditions that are of interest for the exploitation of the powerhouse. In order to determine these inlet conditions, a combined steady-state runner and an initial draft tube analysis
CFD based draft tube hydraulic design optimization
McNabb, J.; Devals, C.; Kyriacou, S. A.; Murry, N.; Mullins, B. F.
2014-03-01
The draft tube design of a hydraulic turbine, particularly in low to medium head applications, plays an important role in determining the efficiency and power characteristics of the overall machine, since an important proportion of the available energy, being in kinetic form leaving the runner, needs to be recovered by the draft tube into static head. For large units, these efficiency and power characteristics can equate to large sums of money when considering the anticipated selling price of the energy produced over the machine's life-cycle. This same draft tube design is also a key factor in determining the overall civil costs of the powerhouse, primarily in excavation and concreting, which can amount to similar orders of magnitude as the price of the energy produced. Therefore, there is a need to find the optimum compromise between these two conflicting requirements. In this paper, an elaborate approach is described for dealing with this optimization problem. First, the draft tube's detailed geometry is defined as a function of a comprehensive set of design parameters (about 20 of which a subset is allowed to vary during the optimization process) and are then used in a non-uniform rational B-spline based geometric modeller to fully define the wetted surfaces geometry. Since the performance of the draft tube is largely governed by 3D viscous effects, such as boundary layer separation from the walls and swirling flow characteristics, which in turn governs the portion of the available kinetic energy which will be converted into pressure, a full 3D meshing and Navier-Stokes analysis is performed for each design. What makes this even more challenging is the fact that the inlet velocity distribution to the draft tube is governed by the runner at each of the various operating conditions that are of interest for the exploitation of the powerhouse. In order to determine these inlet conditions, a combined steady-state runner and an initial draft tube analysis, using a
Student Centric Learning Through Planned Hard work - An Innovative Model
Aithal, Sreeramana; Aithal, Shubrajyotsna
2016-01-01
The strategies followed by educational institutions and the students become very important when the performance of students in the examinations is concerned. By means of properly planned and well guided model of training and motivation to do hard work, students can follow a well disciplined study plan and become exceptionally successful in examinations. Teaching and training by experienced and dedicated faculty members, continuous support by parents and motivating the students based on settin...
Directory of Open Access Journals (Sweden)
Amer Khalid Ahmed Al-Neama
2017-06-01
Full Text Available This paper explains a model to predict the draft force acting on varying standard single tines by using principles of soil mechanics and soil profile evaluation. Draft force (Fd measurements were made with four standard single tines comprising Heavy Duty, Double Heart, Double Heart with Wings and Duck Foot. Tine widths were 6.5, 13.5, 45 and 40 cm, respectively. The test was conducted in a soil bin with sandy loam soil. The effects of forward speeds and working depths on draft forces were investigated under controlled lab conditions. Results were evaluated based on a prediction model. A good correlation between measured and predicted Fd values for all tines with an average absolute variation less than 15 % was found.
25 CFR 170.413 - What is the public role in developing the long-range transportation plan?
2010-04-01
... Roads Program Facilities Long-Range Transportation Planning § 170.413 What is the public role in developing the long-range transportation plan? BIA or the tribe must solicit public involvement. If there are... newspapers when the draft long-range transportation plan is complete. In the absence of local public...
Planning for a program design for energy environmental analysis. Final report, draft
Energy Technology Data Exchange (ETDEWEB)
Denton, J; Saaty, T; Blair, P; Ma, F; Buneman, P
1976-04-01
The objective of the work reported here is to assist BER/ERDA in program planning with respect to a regional assessment study program for energy environmental analysis. The focus of the work was to examine the use of operational gaming fof regional assessment studies. Specific concerns were gaming applications (1) in regional assessment or management and direction of regional assessments; (2) for achieving a higher level of public understanding of environmental, health, and safety problems of energy; (3) with respect to the supply of adequately trained manpower for energy; (4) with respect to computational requirements; and (5) with respect to current state-of-the-art in computer simulation. In order to investigate these concerns and examine the feasibility of using operational gaming in a regional assessment study program, a Regional Energy Environment Game (REEG) was designed and implemented on an IBM 370/168 digital computer employing APL (A Programming Language). The applicability of interactive operational gaming has been demonstrated by the REEG as applied to a region consisting of Delaware, Maryland, New Jersey, Pennsylvania, and the District of Columbia.
A study of swirl flow in draft tubes
Energy Technology Data Exchange (ETDEWEB)
Dahlhaug, Ole Gunnar
1997-12-31
This thesis presents measurements performed inside conical diffuser and bend, draft tubes of model hydro turbines, and draft tube of a prototype hydro turbine. Experimental results for swirling flow in conical diffuser and bend are presented in three different geometries. The axial velocity decreases at the centre of the tube at high swirl numbers because of an axial pressure gradient set up by the downstream frictional damping of the tangential velocities and the pressure increase downstream of the diffuser. Analytical models of the tangential velocity profiles are found and the radial pressure distribution calculated. Good correlation to the measured pressure distribution was achieved. Diffuser efficiency was calculated based on the equations for velocity and pressure profiles, which gave a qualified estimate of the diffuser hydraulic performance. The calculation shows that the bend reduces the efficiency by more than 30%. For a straight tube followed by a diffuser, numerical calculations were done, using K{epsilon}, RNG and RSM turbulence models for all measured swirl numbers. The K{epsilon} model gave best results for the forced vortex profile at low swirl numbers, while the RSM model gave best results at high swirl number. The turbulent kinetic energy at high swirl numbers gave the largest difference between the calculated and the measured values. Measurements on draft tubes in model turbines show the importance of good draft tube design. Prototype measurements on a Francis turbine show how the outlet draft tube flow should be measured for prototype draft tube evaluation. 54 refs., 118 figs., 2 tabs.
A study of swirl flow in draft tubes
Energy Technology Data Exchange (ETDEWEB)
Dahlhaug, Ole Gunnar
1998-12-31
This thesis presents measurements performed inside conical diffuser and bend, draft tubes of model hydro turbines, and draft tube of a prototype hydro turbine. Experimental results for swirling flow in conical diffuser and bend are presented in three different geometries. The axial velocity decreases at the centre of the tube at high swirl numbers because of an axial pressure gradient set up by the downstream frictional damping of the tangential velocities and the pressure increase downstream of the diffuser. Analytical models of the tangential velocity profiles are found and the radial pressure distribution calculated. Good correlation to the measured pressure distribution was achieved. Diffuser efficiency was calculated based on the equations for velocity and pressure profiles, which gave a qualified estimate of the diffuser hydraulic performance. The calculation shows that the bend reduces the efficiency by more than 30%. For a straight tube followed by a diffuser, numerical calculations were done, using K{epsilon}, RNG and RSM turbulence models for all measured swirl numbers. The K{epsilon} model gave best results for the forced vortex profile at low swirl numbers, while the RSM model gave best results at high swirl number. The turbulent kinetic energy at high swirl numbers gave the largest difference between the calculated and the measured values. Measurements on draft tubes in model turbines show the importance of good draft tube design. Prototype measurements on a Francis turbine show how the outlet draft tube flow should be measured for prototype draft tube evaluation. 54 refs., 118 figs., 2 tabs.
Production, staff, working time and financial planning
Directory of Open Access Journals (Sweden)
Orlando Boiteux
2009-07-01
Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.
Draft Animal Power at the Core of Strategies of Family Farms in Sub-Saharan Africa
Directory of Open Access Journals (Sweden)
M. Havard
2004-03-01
Full Text Available A comparative analysis was carried out on the use of draft animal power in three contrasted situations: the groundnut basin of Senegal, North-Cameroon, and Eastern Burkina Faso. The objective was to characterize draft animal power within farms. In each situation, data were collected according to specific methods and tools, and with the collaboration of various partners, but they did not allow for comparisons between the three countries. In any case, the analysis shows that farmers’ access to animal draft is often a difficult and step by step project. The first step is the acquisition of draft animals, which can require years of effort. The introduction of animal traction leads to major changes in the production system of farmers who need to find a balance between land and energy availability, and manpower. The use of animals helps expand cultivated areas and develop crop/livestock integration. It changes the work organization and distribution, and generates new incomes. Finally, it creates new tasks related to husbandry activities, which thus lead to more expenses from farmers. At the farm level, analyses show that farmers acquire implements in various ways and therefore use various strategies in order to have access to and retain animal traction. They also confirm the central role of animal traction in the life cycle of the farms. At the village level, they show the determining role of work and land exchanges among farms in the process of animal traction acquisition. This process is at an advanced stage in the Senegalese groundnut basin and at an earlier stage in Eastern Burkina Faso and North-Cameroon. It is essential to assist these processes. Priorities must be given to the acquisition of draft animals for unequipped farmers in Eastern Burkina Faso and North-Cameroon, and to taking sustainable measures in all three countries studied, particularly in Senegal: diversified activities, technique control, area-specific innovations.
In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. The IAP communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s scoping and initial proble...
Exercising the federal radiological emergency response plan
International Nuclear Information System (INIS)
Gant, K.S.; Adler, M.V.; Wolff, W.F.
1986-01-01
Multiagency exercises were an important part of the development of the Federal Radiological Emergency Response Plan. This paper concentrates on two of these exercises, the Federal Field Exercise in March 1984 and the Relocation Tabletop Exercise in December 1985. The Federal Field Exercise demonstrated the viability and usefulness of the draft plan; lessons learned from the exercise were incorporated into the published plan. The Relocation Tabletop Exercise examined the federal response in the postemergency phase. This exercise highlighted the change over time in the roles of some agencies and suggested response procedures that should be developed or revised. 8 refs
Work-in-process clearing in supply chain operations planning
Selcuk, B.; Fransoo, J.C.; Kok, de A.G.
2008-01-01
In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a
Process development work plan for waste feed delivery system
International Nuclear Information System (INIS)
Papp, I.G.
1998-01-01
This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis
Remedial action work plan for the Colonie site. Revision 1
International Nuclear Information System (INIS)
1985-08-01
The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab
Draft of regulations for road transport of radioactive wastes
International Nuclear Information System (INIS)
Gese, J.; Zizka, B.
1979-06-01
A draft regulation is presented for the transport of solid and solidified radioactive wastes from nuclear power plants. The draft takes into consideration dosimetric, safety and fire-fighting directives, transport organization, anticipated amounts of radioactive wastes, characteristics of containers, maintenance of vehicles, and equipment of vehicles and personnel. The draft is based on the provisional regulations governing the transport on public roads issued in 1973, valid directives, decrees, acts and standards, and complies with 1973 IAEA requirements. (J.P.)
Analysis of the Kaplan turbine draft tube effect
International Nuclear Information System (INIS)
Motycak, L; Skotak, A; Obrovsky, J
2010-01-01
The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.
Analysis of the Kaplan turbine draft tube effect
Energy Technology Data Exchange (ETDEWEB)
Motycak, L; Skotak, A; Obrovsky, J, E-mail: motycak.vhs@cbeng.c [CKD Blansko Engineering, a.s., Capkova 2357/5, Blansko 67801 (Czech Republic)
2010-08-15
The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.
Analysis of the Kaplan turbine draft tube effect
Motycak, L.; Skotak, A.; Obrovsky, J.
2010-08-01
The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.
FY 1992 work plan and technical progress reports
Energy Technology Data Exchange (ETDEWEB)
NONE
1992-11-01
The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.
RFI/RI work plan for the Road A Chemical Basin 904-111G
International Nuclear Information System (INIS)
Kmetz, T.F.
2000-01-01
This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities
RFI/RI work plan for the Road A Chemical Basin 904-111G
Energy Technology Data Exchange (ETDEWEB)
Kmetz, T.F.
2000-03-07
This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.
International Nuclear Information System (INIS)
Bates, E.F.; Grimes, B.K.; Ramos, S.L.
1982-05-01
This document provides a Standard Review Plan for the guidance of the NRC staff to assure that complete and uniform reviews are made of research and test reactor emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in Draft II of ANSI/ANS 15.16 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix
Record of the fourth meeting of the working group, Vienna, 6 April 1979
International Nuclear Information System (INIS)
1979-04-01
The items discussed include the report by the Co-Chairmen on the February TCC, the progress report from the joint sub-groups, matters arising from the progress report of the joint sub-groups, the draft chapter II of the final report, the future programme of work, and a discussion of the draft summary (chapter 12) of the draft final report
16 CFR 1.84 - Draft environmental impact statements: Availability and comment.
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...
10 CFR 51.117 - Draft environmental impact statement-notice of availability.
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a draft environmental impact statement or any supplement to a draft environmental impact statement, the appropriate NRC staff director...
Draft Genome Sequence of Lactobacillus salivarius SGL 03, a Novel Potential Probiotic Strain.
Federici, Federica; Manna, Laura; Rizzi, Eleonora; Galantini, Elena; Marini, Umberto
2017-12-07
In this work, we report the draft genome sequence of Lactobacillus salivarius SGL 03, a novel potential probiotic strain isolated from healthy infant stools. Antibiotic resistance analysis revealed the presence of a tetracycline resistance gene without elements potentially responsible for interspecific horizontal gene transfer. Copyright © 2017 Federici et al.
78 FR 77027 - Overhead Clearance (Air-Draft) Accidents
2013-12-20
... No. USCG-2013-0466] Overhead Clearance (Air-Draft) Accidents AGENCY: Coast Guard, DHS. ACTION... clearance (air-draft) accidents. In its petition, which calls for vessel masters to be provided with... accidents that it says were avoidable and that resulted in damage to or destruction of waterway...
76 FR 9210 - Draft DOC National Aquaculture Policy
2011-02-16
... DEPARTMENT OF COMMERCE Draft DOC National Aquaculture Policy AGENCY: Commerce. ACTION: Notice of availability of draft aquaculture policy; request for comments. SUMMARY: The Department of Commerce (DOC) is... United States. The intent of the policy is to guide DOC's actions and decisions on aquaculture and to...
23 CFR 771.123 - Draft environmental impact statements.
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A... significant impacts on the environment. When the applicant, after consultation with any project sponsor that...
Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1
International Nuclear Information System (INIS)
Prather, M.C.
1994-11-01
This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem
Role of working memory components in planning performance of individuals with Parkinson's disease.
Altgassen, Mareike; Phillips, Louise; Kopp, Ute; Kliegel, Matthias
2007-06-11
The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417-423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD). PD resulted in poorer formulation and execution of plans, as measured by the Tower of London task. PD also reduced the efficiency of the episodic buffer and central executive components of working memory, but did not influence storage of verbal or visuospatial information. Planning deficits in PD were particularly linked to problems in integrating multimodal short-term information with long-term memory (episodic buffer). These results emphasize the importance of integrative and executive processing in cognitive problems in PD, rather than simple memory deficits.
American Samoa Energy Action Plan
Energy Technology Data Exchange (ETDEWEB)
Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)
2013-08-01
Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.
Pilot test of ANSI draft standard N13.29 environmental dosimetry -- Performance criteria for testing
International Nuclear Information System (INIS)
Klemic, G.; Shebell, P.; Monetti, M.; Raccah, F.; Sengupta, S.
1998-09-01
American National Standards Institute Draft N13.29 describes performance tests for environmental radiation dosimetry providers. If approved it would be the first step toward applying the types of performance testing now required in personnel dosimetry to environmental radiation monitoring. The objective of this study was to pilot test the draft standard, before it undergoes final balloting, on a small group of dosimetry providers that were selected to provide a mix of facility types, thermoluminescent dosimeter designs and monitoring program applications. The first phase of the pilot test involved exposing dosimeters to laboratory photon, beta, and x-ray sources at routine and accident dose levels. In the second phase, dosimeters were subjected to ninety days of simulated environmental conditions in an environmental chamber that cycled through extremes of temperature and humidity. Two out of seven participants passed all categories of the laboratory testing phase, and all seven passed the environmental test phase. While some relatively minor deficiencies were uncovered in the course of the pilot test, the results show that draft N13.29 describes useful tests that could be appropriate for environmental dosimetry providers. An appendix to this report contains recommendations that should be addressed by the N13.29 working group before draft N13.29 is submitted for balloting
Reduced order model of draft tube flow
International Nuclear Information System (INIS)
Rudolf, P; Štefan, D
2014-01-01
Swirling flow with compact coherent structures is very good candidate for proper orthogonal decomposition (POD), i.e. for decomposition into eigenmodes, which are the cornerstones of the flow field. Present paper focuses on POD of steady flows, which correspond to different operating points of Francis turbine draft tube flow. Set of eigenmodes is built using a limited number of snapshots from computational simulations. Resulting reduced order model (ROM) describes whole operating range of the draft tube. ROM enables to interpolate in between the operating points exploiting the knowledge about significance of particular eigenmodes and thus reconstruct the velocity field in any operating point within the given range. Practical example, which employs axisymmetric simulations of the draft tube flow, illustrates accuracy of ROM in regions without vortex breakdown together with need for higher resolution of the snapshot database close to location of sudden flow changes (e.g. vortex breakdown). ROM based on POD interpolation is very suitable tool for insight into flow physics of the draft tube flows (especially energy transfers in between different operating points), for supply of data for subsequent stability analysis or as an initialization database for advanced flow simulations
A statistical method for draft tube pressure pulsation analysis
International Nuclear Information System (INIS)
Doerfler, P K; Ruchonnet, N
2012-01-01
Draft tube pressure pulsation (DTPP) in Francis turbines is composed of various components originating from different physical phenomena. These components may be separated because they differ by their spatial relationships and by their propagation mechanism. The first step for such an analysis was to distinguish between so-called synchronous and asynchronous pulsations; only approximately periodic phenomena could be described in this manner. However, less regular pulsations are always present, and these become important when turbines have to operate in the far off-design range, in particular at very low load. The statistical method described here permits to separate the stochastic (random) component from the two traditional 'regular' components. It works in connection with the standard technique of model testing with several pressure signals measured in draft tube cone. The difference between the individual signals and the averaged pressure signal, together with the coherence between the individual pressure signals is used for analysis. An example reveals that a generalized, non-periodic version of the asynchronous pulsation is important at low load.
Ray, R. K.; Syed, T. H.; Saha, Dipankar; Sarkar, B. C.; Patre, A. K.
2017-12-01
Extracted groundwater, 90% of which is used for irrigated agriculture, is central to the socio-economic development of India. A lack of regulation or implementation of regulations, alongside unrecorded extraction, often leads to over exploitation of large-scale common-pool resources like groundwater. Inevitably, management of groundwater extraction (draft) for irrigation is critical for sustainability of aquifers and the society at large. However, existing assessments of groundwater draft, which are mostly available at large spatial scales, are inadequate for managing groundwater resources that are primarily exploited by stakeholders at much finer scales. This study presents an estimate, projection and analysis of fine-scale groundwater draft in the Seonath-Kharun interfluve of central India. Using field surveys of instantaneous discharge from irrigation wells and boreholes, annual groundwater draft for irrigation in this area is estimated to be 212 × 106 m3, most of which (89%) is withdrawn during non-monsoon season. However, the density of wells/boreholes, and consequent extraction of groundwater, is controlled by the existing hydrogeological conditions. Based on trends in the number of abstraction structures (1982-2011), groundwater draft for the year 2020 is projected to be approximately 307 × 106 m3; hence, groundwater draft for irrigation in the study area is predicted to increase by ˜44% within a span of 8 years. Central to the work presented here is the approach for estimation and prediction of groundwater draft at finer scales, which can be extended to critical groundwater zones of the country.
Gas and liquid sampling for closed canisters in KW Basin - Work Plan
International Nuclear Information System (INIS)
Pitkoff, C.C.
1995-01-01
Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule
[The Hospital Emergency Plan: Important Tool for Disaster Preparedness].
Wurmb, Thomas; Scholtes, Katja; Kolibay, Felix; Rechenbach, Peer; Vogel, Ulrich; Kowalzik, Barbara
2017-09-01
Hospitals need to be prepared for any kind of disaster. The terrorist attacks and mass shootings that took place in Europe in recent years impressively demonstrated the capability of hospitals to manage such challenging and disastrous events. To be adequately prepared, the hospital emergency plan is a very important tool. In this article we describe the entire process of drafting the emergency plan. We discuss the theoretical background as well as different models of disaster planning and we give important practical hints and tips for those in charge of the hospital disaster planning. Georg Thieme Verlag KG Stuttgart · New York.
78 FR 66010 - Draft Risk Profile on Pathogens and Filth in Spices; Availability
2013-11-04
...] Draft Risk Profile on Pathogens and Filth in Spices; Availability AGENCY: Food and Drug Administration... availability of a draft risk profile entitled ``FDA Draft Risk Profile: Pathogens and Filth in Spices'' (draft... posed by consumption of spices in the United States by identifying the most commonly occurring microbial...
Technical Site Information: Planning group of the Directorate and Conventional Construction Division
International Nuclear Information System (INIS)
1993-11-01
This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development
Technical Site Information: Planning group of the Directorate and Conventional Construction Division
Energy Technology Data Exchange (ETDEWEB)
NONE
1993-11-01
This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.
Groundwater Interim Measures Work Plan for the Former Chemical Plant
May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.
Hospital nurses' work environment, quality of care provided and career plans.
Hinno, S; Partanen, P; Vehviläinen-Julkunen, K
2011-06-01
In several European countries, the availability of qualified nurses is insufficient to meet current healthcare requirements. Nurses are highly dissatisfied with the rising demands of the healthcare environment and increasingly considering leaving their jobs. The study aims to investigate the relationships between the characteristics of hospital nurses' work environment and the quality of care provided, and furthermore to examine Dutch nurses' career plans. A cross-sectional, questionnaire survey of registered nurses (n = 334) working in the academic and district hospitals was conducted in 2005/2006. Previously validated questionnaires translated into the participants' language were used. Factor and regression analysis were used for data analysis. Overall, nurses rated their work environment rather favourably. Five work environment characteristics were identified: support for professional development, adequate staffing, nursing competence, supportive management and teamwork. Significant relationships were found between nurses' perceptions of their work environment characteristics and quality of care provided and nurses' career plans. When work environment characteristics were evaluated to be better, nurse-assessed quality of care also increased and intentions to leave current job decreased linearly. Study findings suggest that nurses' perceptions of their work environment are important for nurse outcomes in hospital settings. Further research is needed to explore the predictive ability of the work environment for nurse, patient and organizational outcomes in hospitals. © 2011 The Authors. International Nursing Review © 2011 International Council of Nurses.
2011-12-19
... performance of medical devices in women. This information can be of benefit to patients and their medical... draft guidance before it begins work on the final version of the guidance, submit either electronic or...
Energy Technology Data Exchange (ETDEWEB)
NONE
2004-07-01
According to the Inventory on Land with Activities or Installations which have the Potential to Pollute the land, drawn up by the Environmental Management Public Company, IHOBE, for the Department of Regional Planning and Environmental Planning, one per cent of the surface area of the Autonomous Community of the Basque Country may currently be classified as potentially polluted land. Last March 2 the Basque Government council passed the draft Bill for the Prevention and Correction of Pollution of Land which was sent to the Basque Parliament for its subsequent debate and passing. (Author)
2012-05-24
... Mexico. FOR FURTHER INFORMATION CONTACT: Brad Higdon, Planning and Environmental Coordinator, Taos Field..., largely through the public participation provided under NEPA. The Draft RMP/ Environmental Impact...] Notice of Availability of the Record of Decision for the Taos Resource Management Plan/Environmental...
On random pressure pulses in the turbine draft tube
Kuibin, P. A.; Shtork, S. I.; Skripkin, S. G.; Tsoy, M. A.
2017-04-01
The flow in the conical part of the hydroturbine draft tube undergoes various instabilities due to deceleration and flow swirling at off-design operation points. In particular, the precessing vortex rope develops at part-load regimes in the draft tube. This rope induces periodical low-frequency pressure oscillations in the draft tube. Interaction of rotational (asynchronous) mode of disturbances with the elbow can bring to strong oscillations in the whole hydrodynamical system. Recent researches on flow structure in the discharge cone in a regime of free runner had revealed that helical-like vortex rope can be unstable itself. Some coils of helix close to each other and reconnection appears with generation of a vortex ring. The vortex ring moves toward the draft tube wall and downstream. The present research is focused on interaction of vortex ring with wall and generation of pressure pulses.
Oil spill response planning on the Columbia river estuary
International Nuclear Information System (INIS)
Christopherson, S.K.; Slyman, P.M.
1993-01-01
The Columbia River Estuary lies along the Washington-Oregon state boundary on the west coast of the United States. The entire area is environmentally very sensitive with numerous large, shallow bays, exposed mud flats, wetland areas, and central channels having maximum currents of three to four knots. These features make the area very difficult to protect from an oil spill. Spill response is further complicated because of the many different state, federal, and local jurisdictions with mandated responsibilities in oil spill response and environmental protection. Under the leadership of the US Coast Guard Marine Safety Office in Portland, Oregon, a steering group was established to guide the development of a response plan for the Columbia River Estuary. A concerted effort was made to include representatives from response organizations, natural resource agencies, and resource users from federal, state, and local governments, and commercial sectors in the planning process. The first draft of an operational response plan was completed the summer of 1992 through a combination of technical workshops, field trips, and small working groups meeting with local communities. The Columbia River Estuary Response Plan prioritizes areas to protect; identifies specific response strategies for protecting these areas; and outlines the Iogistics needed to implement these strategies, including equipment needs, the location of staging areas, and the identification of pre-designed command posts. The local spill response cooperative and oil transportation industry are using the plan to coordinate the purchase of response equipment and the staging of this equipment at numerous locations along the river. The key to success is ensuring that all the groups responding to an event participate in the planning process together. This process has worked well and will serve as a model for response planning for other areas along the Columbia River and coastal areas of Washington and Oregon
International Nuclear Information System (INIS)
1996-07-01
This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan
WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern
International Nuclear Information System (INIS)
2001-01-01
This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
2010-10-01
..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
Sierer, S Patrick; Battaglini, Claudio L; Mihalik, Jason P; Shields, Edgar W; Tomasini, Nathan T
2008-01-01
The purpose of this study was to examine performance differences between drafted and nondrafted athletes (N = 321) during the 2004 and 2005 National Football League (NFL) Combines. We categorized players into one of 3 groups: Skill, Big skill, and Linemen. Skill players (SP) consisted of wide receivers, cornerbacks, free safeties, strong safeties, and running backs. Big skill players (BSP) included fullbacks, linebackers, tight ends, and defensive ends. Linemen (LM) consisted of centers, offensive guards, offensive tackles, and defensive tackles. We analyzed player height and mass, as well as performance on the following combine drills: 40-yard dash, 225-lb bench press test, vertical jump, broad jump, pro-agility shuttle, and the 3-cone drill. Student t-tests compared performance on each of these measures between drafted and nondrafted players. Statistical significance was found between drafted and nondrafted SP for the 40-yard dash (P ready themselves for the NFL Combine.
Compression planning for continuous improvement in quality programs
International Nuclear Information System (INIS)
Willis, Y.A.; Hood, F.C.
1992-01-01
This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives
This report was prepared by the Global Change Research Program (GCRP) in the National Center for Environmental Assessment (NCEA) of the Office of Research and Development (ORD) at the U.S. Environmental Protection Agency (EPA). This draft report is a review of decision-making pro...
Executive summary of a draft report on the geology and salt deposits of the Salina Salt Basin
International Nuclear Information System (INIS)
1978-01-01
The study discussed is the first phase of a program for the geologic evaluation of the Silurian-age bedded salt of the Salina Group. The Salina Salt Basin, as used in this study, includes those portions of the Appalachian and Michigan basins that are underlain by the Salina Group. The full draft report consists of a regional reconnaissance, identification of study areas in New York and Ohio which are deserving of a more thorough evaluation, and a program plan to accomplish that evaluation. The entire draft report is in two volumes, contains 1068 pages and 204 figures, and has a bibliography that consists of over 1100 separate entries. This summary has been prepared for the benefit of those who wish to review the results of this phase of the evaluation but who do not want to go through the exhaustive detail that is present in the full report. The regional reconnaissance was accomplished by a very thorough and extensive literature review, addressing the following topics: depth of salt, thickness, stratigraphy, tectonics, structure, seismicity, hydrology, erosion and denudation, and mineral resources. Before further technical evaluation proceeds, the draft report and the proposed program are being subjected to a thorough evaluation by a number of groups, including appropriate state agencies. This rather extensive review process is being conducted to ensure that the program is performed entirely in the open and subject to continuous public surveillance. This report does not represent the first work that has been done in this region with regard to evaluating the salt deposits for waste disposal. Previous efforts have been limited, however, and have been done by individual consultants. At the present time, the U.S. Geological Survey is also participating in the technical evaluation; their results will be issued separately. In addition to the technical evaluations, environmental surveys will also be conducted as an integral part of this thorough evaluation program
North Carolina State Dept. of Community Colleges, Raleigh.
A two-part articulation instructional objective guide for drafting (graphic communications) is provided. Part I contains summary information on seven blocks (courses) of instruction. They are as follow: introduction; basic technical drafting; problem solving in graphics; reproduction processes; freehand drawing and sketching; graphics composition;…
Nanomaterial Case Studies: Nanoscale Titanium Dioxide (External Review Draft)
This draft document presents two case studies of nanoscale titanium dioxide (nano-TiO2) used (1) to remove arsenic from drinking water and (2) as an active ingredient in topical sunscreen. The draft case studies are organized around a comprehensive environmental asses...
Effect of noise on comfort in open-plan offices: application of an assessment questionnaire.
Perrin Jegen, N; Chevret, P
2017-01-01
Open-plan offices account for 60% of French office workspaces. The noise levels recorded in this type of environment are much lower than those encountered in industrial workplaces. Nevertheless, surveys show that noise is considered by employees as the main source of discomfort. A first questionnaire dedicated to noise discomfort was produced in 2013 and tested on a panel made up of 217 people working in 7 French companies. Today, it also makes it possible to address the issues of fatigue related to ambient sound, but above all, the survey aims to study the differences in how ambient noise is perceived depending on the type of open-plan office. On the basis of that new version, a second survey has been conducted in 23 open-plan offices, making it possible to collect the responses from 617 employees. Most of the results of the first survey have been confirmed, with an increase in the significance of the statistical analyses. Moreover, French Standard NF S 31-199, which is currently being drafted, establishes a typology of open-plan office spaces according to the types of work done in them. Based on this typology, it appears that when dealing with the impact on noise on workers, a distinction has to be made between the types of open plan offices. Practitioner Summary: Surveys conducted in open-plan offices show that noise is considered by employees as the main source of discomfort even if the noise recorded in this type of environment is not hazardous. This work presents the result of a large survey dedicated to noise discomfort conducted in 23 open-plan offices.
Ema, Makoto; Fukui, Yoshihiro; Aoyama, Hiroaki; Fujiwara, Michio; Fuji, Junichiro; Inouye, Minoru; Iwase, Takayuki; Kihara, Takahide; Oi, Akihide; Otani, Hiroki; Shinomiya, Mitsuhiro; Sugioka, Kozo; Yamano, Tsunekazu; Yamashita, Keisuke H; Tanimura, Takashi
2007-06-01
In October 2006, a new revision of the draft guideline (OECD Guideline for the Testing of Chemicals, Proposal for a New Guideline 426. Developmental Neurotoxicity Study) and Draft Document of the Retrospective Performance Assessment (RPA) of the Draft Test Guideline 426 on Developmental Neurotoxicity were distributed following incorporation of the results of the Expert Consultation Meeting in Tokyo on May 24-26, 2005. The draft guideline consists of 50 paragraphs and an appendix with 102 references; and the draft RPA consists of 37 paragraphs with 109 references. National coordinators were requested to arrange for national expert reviews of these draft documents in their member countries. Members of the Developmental Neurotoxicology (DNT) Committee of the Japanese Teratology Society (JTS) reviewed, discussed, and commented on the draft Test Guideline Proposal. The DNT Committee of the JTS also commented on the draft document of the RPA. These comments were sent to the OECD Secretariat. The DNT Committee of the JTS expects the comments to be useful for the finalization of these draft documents.
Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory
Li, Shaofeng; Fu, Mengxia
2018-01-01
This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…
Bridging the gap between private industry and government in infrastructure development planning
CSIR Research Space (South Africa)
Ittmann, HW
2013-07-01
Full Text Available , to keep up with economic growth and remain regionally competitive. To this end the government and state-owned enterprises have made significant investment commitments and encouraging development plans are being drafted. But infrastructure development...
Sea ice draft in the Weddell Sea, measured by upward looking sonars
Directory of Open Access Journals (Sweden)
A. Behrendt
2013-06-01
Full Text Available The presented database contains time-referenced sea ice draft values from upward looking sonar (ULS measurements in the Weddell Sea, Antarctica. The sea ice draft data can be used to infer the thickness of the ice. They were collected during the period 1990–2008. In total, the database includes measurements from 13 locations in the Weddell Sea and was generated from more than 3.7 million measurements of sea ice draft. The files contain uncorrected raw drafts, corrected drafts and the basic parameters measured by the ULS. The measurement principle, the data processing procedure and the quality control are described in detail. To account for the unknown speed of sound in the water column above the ULS, two correction methods were applied to the draft data. The first method is based on defining a reference level from the identification of open water leads. The second method uses a model of sound speed in the oceanic mixed layer and is applied to ice draft in austral winter. Both methods are discussed and their accuracy is estimated. Finally, selected results of the processing are presented. The data can be downloaded from doi:10.1594/PANGAEA.785565.
1 CFR 15.10 - Information on drafting and publication.
2010-01-01
... 1 General Provisions 1 2010-01-01 2010-01-01 false Information on drafting and publication. 15.10... drafting and publication. The Director of the Federal Register may prepare, and distribute to agencies... chapter. The Director may also develop and conduct programs of technical instruction. ...
Energy Technology Data Exchange (ETDEWEB)
NONE
1990-03-01
Promotion of development of hydraulic power and others as fossil fuel alternative energy sources is one of the most important measures for solving the global environmental problems. This draft plan proposes, first of all, to conduct surveys on hydraulic power resources on a global scale, to collect the basic data for development of the energy sources. It is estimated that developed hydraulic power resources account for approximately 14% of the total developable resources, the remainder being left untouched. By region, these percentages rise to approximately 55 and 45% in North America and Europe, respectively. These percentages in Asia, Africa, Latin America and FSU are significantly lower, and their undeveloped resources are estimated to total approximately 6 times as large as those already developed worldwide. It is expected that the hydraulic power resources are surveyed on a 10-year plan (1991 to 2000) with a total budget of 30 billion yen, to collect the data and establish the databases in cooperation with international organizations, e.g., UN organizations, regional organizations (e.g., ASEAN organizations) and newly founded organizations. (NEDO)
Denisse Cangrejo Aljure; Carlos Gustavo Infante
2010-01-01
The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...
Technical work plan for Surface Impoundments Operable Unit engineering support studies
International Nuclear Information System (INIS)
1995-11-01
This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided
Technical work plan for Surface Impoundments Operable Unit engineering support studies
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-11-01
This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.
Planned Positron Factory project
International Nuclear Information System (INIS)
Okada, Sohei
1990-01-01
The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)
Energy Technology Data Exchange (ETDEWEB)
LaFreniere, L. M.; Environmental Science Division
2007-02-02
This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.
Work plan, AP-102 mixer pump removal and pump replacement
International Nuclear Information System (INIS)
Jimenez, R.F.
1994-01-01
The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ''green house'' will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken
Draft of textbook focused on indirect taxes
Nováková, Hana
2012-01-01
The diploma thesis is about draft of textbook which is focused on indirect taxes for business school. The thesis is divided into theoretical and practical part. The theoretical part is focused on teaching tax issues at business school. Readers are introduced with basic studying documents, for example framework educational program and school educational program. In the following part I have conducted didactic analysis of curriculum and textbook of economics for business schools. The draft of t...
The importance of work or productive activity in life care planning and case management.
Reid, Christine; Riddick-Grisham, Susan
2015-01-01
The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.
Scope and purpose of the preliminary planning work
International Nuclear Information System (INIS)
Kalas, P.
1976-01-01
The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de
The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667
Energy Technology Data Exchange (ETDEWEB)
Young, Ralph [Paducah Citizens Advisory Board (United States)
2013-07-01
One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site
Draft Public Health Statement on the U.S.-Central American Free Trade Agreement (CAFTA).
2004-01-01
The U.S. is rapidly negotiating a raft of new regional and bilateral trade agreements. The most recent agreement, with Central America, [was to] come before Congress for a vote as soon as late May. There is growing concern that international trade agreements threaten health care and the health of communities. . . . The Draft Public Health Statement on the U.S.-Central American Free Trade Agreement (CAFTA), developed by CPATH which planned a campaign around the issues, analyzes key provisions from the perspective of public health and suggests reframing the trade debate in terms of health.
A working plan for working group 2 'enrichment' within the scope of INFCE
International Nuclear Information System (INIS)
1977-01-01
A working plan for INFCE/WG.2 is presented, outlining the major questions which the group needs to answer under the headings: 1. Enrichment needs and supply, 2. Models for cross-investment, 3. Market situation, 4. Technical and economic assessment of the different enrichment technologies, and 5. Safeguards aspects. It is suggested that the group's assessment should include: 1. Future enrichment capacities, 2. Multinational or regional fuel cycle centres, 3. Possible patterns for guarantees of supply, and 4. Special needs of developing countries
WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern
International Nuclear Information System (INIS)
2002-01-01
This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable
2013-11-19
... OFFICE OF SCIENCE AND TECHNOLOGY POLICY OFFICE National Nanotechnology Initiative Strategic Plan; National Science and Technology Council; National Nanotechnology Coordination Office AGENCY: Executive... Science, Engineering, and Technology Subcommittee requests public comments on the draft 2014 National...
Wang, Zhuo; Pascual-Anaya, Juan; Zadissa, Amonida; Li, Wenqi; Niimura, Yoshihito; Huang, Zhiyong; Li, Chunyi; White, Simon; Xiong, Zhiqiang; Fang, Dongming; Wang, Bo; Ming, Yao; Chen, Yan; Zheng, Yuan; Kuraku, Shigehiro; Pignatelli, Miguel; Herrero, Javier; Beal, Kathryn; Nozawa, Masafumi; Li, Qiye; Wang, Juan; Zhang, Hongyan; Yu, Lili; Shigenobu, Shuji; Wang, Junyi; Liu, Jiannan; Flicek, Paul; Searle, Steve; Wang, Jun; Kuratani, Shigeru; Yin, Ye; Aken, Bronwen; Zhang, Guojie; Irie, Naoki
2013-06-01
The unique anatomical features of turtles have raised unanswered questions about the origin of their unique body plan. We generated and analyzed draft genomes of the soft-shell turtle (Pelodiscus sinensis) and the green sea turtle (Chelonia mydas); our results indicated the close relationship of the turtles to the bird-crocodilian lineage, from which they split ∼267.9-248.3 million years ago (Upper Permian to Triassic). We also found extensive expansion of olfactory receptor genes in these turtles. Embryonic gene expression analysis identified an hourglass-like divergence of turtle and chicken embryogenesis, with maximal conservation around the vertebrate phylotypic period, rather than at later stages that show the amniote-common pattern. Wnt5a expression was found in the growth zone of the dorsal shell, supporting the possible co-option of limb-associated Wnt signaling in the acquisition of this turtle-specific novelty. Our results suggest that turtle evolution was accompanied by an unexpectedly conservative vertebrate phylotypic period, followed by turtle-specific repatterning of development to yield the novel structure of the shell.
Niimura, Yoshihito; Huang, Zhiyong; Li, Chunyi; White, Simon; Xiong, Zhiqiang; Fang, Dongming; Wang, Bo; Ming, Yao; Chen, Yan; Zheng, Yuan; Kuraku, Shigehiro; Pignatelli, Miguel; Herrero, Javier; Beal, Kathryn; Nozawa, Masafumi; Li, Qiye; Wang, Juan; Zhang, Hongyan; Yu, Lili; Shigenobu, Shuji; Wang, Junyi; Liu, Jiannan; Flicek, Paul; Searle, Steve; Wang, Jun; Kuratani, Shigeru; Yin, Ye; Aken, Bronwen; Zhang, Guojie; Irie, Naoki
2014-01-01
The unique anatomical features of turtles have raised unanswered questions about the origin of their unique body plan. We generated and analyzed draft genomes of the soft-shell turtle (Pelodiscus sinensis) and the green sea turtle (Chelonia mydas); our results indicated the close relationship of the turtles to the bird-crocodilian lineage, from which they split ~267.9–248.3 million years ago (Upper Permian to Triassic). We also found extensive expansion of olfactory receptor genes in these turtles. Embryonic gene expression analysis identified an hourglass-like divergence of turtle and chicken embryogenesis, with maximal conservation around the vertebrate phylotypic period, rather than at later stages that show the amniote-common pattern. Wnt5a expression was found in the growth zone of the dorsal shell, supporting the possible co-option of limb-associated Wnt signaling in the acquisition of this turtle-specific novelty. Our results suggest that turtle evolution was accompanied by an unexpectedly conservative vertebrate phylotypic period, followed by turtle-specific repatterning of development to yield the novel structure of the shell. PMID:23624526
Final work plan : environmental site investigation at Sylvan Grove, Kansas.
Energy Technology Data Exchange (ETDEWEB)
LaFreniere, L. M. (Environmental Science Division)
2012-07-15
In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining
[Critical evaluation of the first draft of DSM-V].
Frances, A
2011-02-16
Critical evaluation of DSM-V first draft This is an evaluation of the first DSM-V (Diagnostic and Statistical Manual of Mental Disorders-V) draft from the DSM-IV chairman. First, a brief history of DSM is reported. Then, major reasons for present controversies and the threat they raise to APA leadership in the field are discussed. Third point is careful recollection of the several conflicting aspects of the DSM-V draft, paying attention to drawbacks and their implications for future clinical practice, research and forensic activity. Comment is finally provided about APA (American Psychiatric Association) decisions aimed at reaching more consensus about this basic instrument of American psychiatry.
The importance of work or productive activity in life care planning and case management
Reid, Christine; Riddick-Grisham, Susan
2015-01-01
Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330
Satisfaction with work-life balance and the career and retirement plans of US oncologists.
Shanafelt, Tait D; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E; Sloan, Jeff; Gradishar, William J
2014-04-10
To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P hour, 0.977; P work hours and leave current position on multivariable analysis. Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted.
2011-04-22
...). The Draft PEIS/R document evaluates the direct, indirect, and cumulative effects of implementing the... fax at 916-978-5469, or e-mail at [email protected] . Additional information is available online at... Department of Fish and Game (DFG), will work to implement the Settlement. Reclamation, on behalf of the...
Suryani, Untari Fajar; Nurjazuli, Nurjazuli; Arso, Septo Pawelas
2013-01-01
Target of MDG's to reach maternal mortality rate of 102/100.000 live-births and infantmortality rate of 23/1000 live-births had been performed by improving maternal health throughincreasing contraceptive prevalence rate and decreasing unmet need. Percentage of male withpermanent birth control in Cilacap district was in the lowest rank, 0.16%. Success of familyplanning program could not be separated from work performance of PLKB (family planning field workers); assessment of PLKB work performa...
Experimentally Identify the Effective Plume Chimney over a Natural Draft Chimney Model
Rahman, M. M.; Chu, C. M.; Tahir, A. M.; Ismail, M. A. bin; Misran, M. S. bin; Ling, L. S.
2017-07-01
The demands of energy are in increasing order due to rapid industrialization and urbanization. The researchers and scientists are working hard to improve the performance of the industry so that the energy consumption can be reduced significantly. Industries like power plant, timber processing plant, oil refinery, etc. performance mainly depend on the cooling tower chimney’s performance, either natural draft or forced draft. Chimney is used to create sufficient draft, so that air can flow through it. Cold inflow or flow reversal at chimney exit is one of the main identified problems that may alter the overall plant performance. The presence Effective Plume Chimney (EPC) is an indication of cold inflow free operation of natural draft chimney. Different mathematical model equations are used to estimate the EPC height over the heat exchanger or hot surface. In this paper, it is aim to identify the EPC experimentally. In order to do that, horizontal temperature profiling is done at the exit of the chimneys of face area 0.56m2, 1.00m2 and 2.25m2. A wire mesh screen is installed at chimneys exit to ensure cold inflow chimney operation. It is found that EPC exists in all modified chimney models and the heights of EPC varied from 1 cm to 9 cm. The mathematical models indicate that the estimated heights of EPC varied from 1 cm to 2.3 cm. Smoke test is also conducted to ensure the existence of EPC and cold inflow free option of chimney. Smoke test results confirmed the presence of EPC and cold inflow free operation of chimney. The performance of the cold inflow free chimney is increased by 50% to 90% than normal chimney.
Advanced Technical Drafting (Industrial Arts) Curriculum Guide. Bulletin 1751.
Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.
This curriculum guide contains materials for a 17-unit course in advanced technical drafting, a followup to the basic technical drafting course in the industrial arts curriculum for grades 10-12. It is intended for use by industrial arts teachers, supervisors, counselors, administrators, and teacher educators. A three-page course overview provides…
In situ vitrification laboratory-scale test work plan
International Nuclear Information System (INIS)
Nagata, P.K.; Smith, N.L.
1991-05-01
The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-09-01
The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.
International Nuclear Information System (INIS)
1995-09-01
The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule
Investigations into dynamics of a draft of mine cars with two locomotives during electric braking
Energy Technology Data Exchange (ETDEWEB)
Sikora-Iliew, R; Szklarski, L; Thuc, Thai Duy
1983-03-01
The computerized simulation of electric braking of a draft of GRANBY-5 mine cars and two locomotives (Ld2 locomotives with LDO30 electric series motors) is discussed. The following stages of simulation are analyzed: constructing a mathematical model of the draft of mine cars during electric (dynamic) braking, equations which describe dynamic states of locomotives, mine cars and electric motors during dynamic braking, equations for stability assessment of the draft during dynamic braking. The analog model for simulation of dynamic braking of the draft is given. Simulation results are shown in 10 diagrams. The WAT-1000 hybrid computer is used. Simulation shows that dynamic braking causes occurrence of maximum forces in the couplers between a locomotive and a mine car. When two locomotives are used the maximum force in couplers is lower than in a draft with one locomotive. Braking distance does not depend on position of locomotives in a draft of mine cars. Doubling draft speed causes braking distance to increase by 4 times. Optimum stability conditions of a draft of mine cars are guaranteed when one locomotive is placed at the draft head and a second is separated from the first one by one third of the draft length. 6 references
Energy Technology Data Exchange (ETDEWEB)
NONE
1997-03-01
This paper describes the research result on the WE-NET project in fiscal 1996. The WE-NET project is composed of various elemental technologies such as hydrogen production, transport, storage, low-temperature material, utilization and hydrogen combustion turbine. The organic integrated cooperation and coordination between individual subtasks are indispensable for effective promotion of the project and optimization of the total system. The current R and D states of every elemental technology were surveyed, and its findings were utilized for coordination of the whole project and examination of the research project including pilot studies. Eleven important items in the total coordination including a total system cost and safety measures in a developmental stage were examined. The development results for 4 years of fiscal 1993-1996 were assessed together, and the draft working plan for fiscal 1997-1998 was also decided. The verification test plan of a hydrogen combustion turbine scheduled in Phase II was studied, and the basic plans of development step were proposed. The draft report of a transition scenario was also prepared. 6 figs., 68 tabs.
International Nuclear Information System (INIS)
Didsbury, R.; Bains, N.; Cho, U.Y.
1998-01-01
The use of three dimensional(3D) computer-aided design and drafting(CADD) models, and the associated information technology and databases, in the engineering and construction phases of large projects is well established and yielding significant improvements in project cost, schedule and quality. The information contained in these models can also be extremely valuable to operating plants, particularly when the visual and spatial information contained in the 3D models is interfaced to other plant information databases. Indeed many plant owners and operators in the process and power industries are already using this technology to assist with such activities as plant configuration management, staff training, work planning and radiation protection. This paper will explore the application of 3D models and the associated databases in an operating plant environment and describe the resulting operational benefits and cost reduction benefits. Several industrial experience case studies will be presented along with suggestions for further future applications. (author). 4 refs., 1 tab., 8 figs
IRIS Assessment Plan for Nitrate and Nitrite (Scoping and Problem Formulation Materials)
In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Nitrate and Nitrite for public review and comment. This document was discussed at an EPA Science Advisory Board (SAB) Chemical Assessment Advisory Committee (CAAC) meeting on September 27-28, 2017....
75 FR 9613 - Draft NIJ Restraints Standard for Criminal Justice
2010-03-03
... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1512] Draft NIJ Restraints Standard for Criminal Justice AGENCY: National Institute of Justice, Office of Justice Programs, DOJ. ACTION: Notice of Draft NIJ Restraints Standard for Criminal Justice and Certification Program...
Design optimization of hydraulic turbine draft tube based on CFD and DOE method
Nam, Mun chol; Dechun, Ba; Xiangji, Yue; Mingri, Jin
2018-03-01
In order to improve performance of the hydraulic turbine draft tube in its design process, the optimization for draft tube is performed based on multi-disciplinary collaborative design optimization platform by combining the computation fluid dynamic (CFD) and the design of experiment (DOE) in this paper. The geometrical design variables are considered as the median section in the draft tube and the cross section in its exit diffuser and objective function is to maximize the pressure recovery factor (Cp). Sample matrixes required for the shape optimization of the draft tube are generated by optimal Latin hypercube (OLH) method of the DOE technique and their performances are evaluated through computational fluid dynamic (CFD) numerical simulation. Subsequently the main effect analysis and the sensitivity analysis of the geometrical parameters of the draft tube are accomplished. Then, the design optimization of the geometrical design variables is determined using the response surface method. The optimization result of the draft tube shows a marked performance improvement over the original.
Yakima Fisheries Project : Revised Draft Environmental Impact Statement.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1995-05-01
BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.
RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3
Energy Technology Data Exchange (ETDEWEB)
1993-12-01
RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.
RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3
International Nuclear Information System (INIS)
1993-12-01
RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP
2013-01-25
... quantity and quality of the experiences and desired recreation setting available in the planning area. The... designation areas; lands with wilderness characteristics; water, soil, and riparian areas; special status... and importance values. Badger Wash, up to 2,200 acres, Alternatives A, B, C and D: No surface...
49 CFR 520.23 - Preparation of draft environmental impact statements.
2010-10-01
... social, economic, and environmental consequences. (b) Form and content requirements. Attachment 1 of this... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of draft environmental impact...
National Research Council Canada - National Science Library
1997-01-01
This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA...
Replacement Nuclear Research Reactor. Supplement to Draft Environmental Impact Statement. Volume 3
International Nuclear Information System (INIS)
1999-01-01
The Draft Environmental Impact Statement for a replacement research reactor at Lucas Heights, was available for public examination and comment for some three months during 1998. A Supplement to the Draft Environmental Impact Statement (Draft EIS) has been completed and was lodged with Environment Australia on 18 January 1999. The Supplement is an important step in the overall environmental assessment process. It reviews submissions received and provides the proponent's response to issues raised in the public review period. General issues extracted from submissions and addressed in the Supplement include concern over liability issues, Chernobyl type accidents, the ozone layer and health issues. Further studies, relating to issues raised in the public submission process, were undertaken for the Supplementary EIS. These studies confirm, in ANSTO's view, the findings of the Draft EIS and hence the findings of the Final EIS are unchanged from the Draft EIS
Replacement Nuclear Research Reactor. Supplement to Draft Environmental Impact Statement. Volume 3
Energy Technology Data Exchange (ETDEWEB)
NONE
1999-01-01
The Draft Environmental Impact Statement for a replacement research reactor at Lucas Heights, was available for public examination and comment for some three months during 1998. A Supplement to the Draft Environmental Impact Statement (Draft EIS) has been completed and was lodged with Environment Australia on 18 January 1999. The Supplement is an important step in the overall environmental assessment process. It reviews submissions received and provides the proponent`s response to issues raised in the public review period. General issues extracted from submissions and addressed in the Supplement include concern over liability issues, Chernobyl type accidents, the ozone layer and health issues. Further studies, relating to issues raised in the public submission process, were undertaken for the Supplementary EIS. These studies confirm, in ANSTO`s view, the findings of the Draft EIS and hence the findings of the Final EIS are unchanged from the Draft EIS
International Nuclear Information System (INIS)
MCCARTHY, M.M.
1999-01-01
This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-09-01
This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.
International Nuclear Information System (INIS)
1995-09-01
This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond
Model trees for identifying exceptional players in the NHL and NBA draft
Liu, Yejia
2018-01-01
Drafting players is crucial for a team’s success. We describe a data-driven interpretable approach for assessing prospects in the National Hockey League and National Basketball Association. Previous approaches have built a predictive model based on player features, or derived performance predictions from comparable players. Our work develops model tree learning, which incorporates strengths of both model-based and cohort-based approaches. A model tree partitions the feature space according to...
Role of working memory components in planning performance of individuals with Parkinson's disease
Altgassen, A.M.; Phillips, L.H.; Kopp, U.; Kliegel, M.
2007-01-01
The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417–423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD).
Report of the first interim meeting of the Seabed Working Group Engineering Studies Task Group
International Nuclear Information System (INIS)
Talbert, D.M.
1982-02-01
The first interim meeting of the Engineering Studies Task Group (ESTG) was held at the Delft Soil Mechanics Laboratory, Delft, The Netherlands, on 21-24 September 1981. The main business of the meeting was the development of a network analysis for the ESTG. Significant progress was made; however, substantial further development remains to be accomplished. Other items discussed were (1) progress relevant to engineering studies made in the various national programs since the sixth annual meeting of the Seabed Working Group (SWG) held in Paris, February, 1981; (2) the ESTG Boundary Conditions and Scope of Work as previously defined at the Paris meeting; (3) the Draft II SWG Five-Year Plan; (4) the deep ocean drilling proposal made by the Site Selection Task Group at the Paris meeting and expanded upon at their May, 1981, meeting; and (5) a recent compilation of data from the Nares Abyssal Plain arising from the US Program studies. Finally, consideration was given to a plan for continued work by the ESTG. A brief discussion of the principal items is given. The current state of the network analysis is shown
A social survey on the noise impact in open-plan working environments in China.
Zhang, Mei; Kang, Jian; Jiao, Fenglei
2012-11-01
The aim of this study is to reveal noise impact in open-plan working environments in China, through a series of questionnaire surveys and acoustic measurements in typical open-plan working environments. It has been found that compared to other physical environmental factors in open-plan working environments, people are much less satisfied with the acoustic environment. The noise impact in the surveyed working environments is rather significant, in terms of sound level inside the office, understanding of colleagues' conversation, and the use of background music such as music players. About 30-50% of the interviewees think that various noise sources inside and outside offices are 'very disturbing' and 'disturbing', and the most annoying sounds include noises from outside, ventilation systems, office equipment, and keyboard typing. Using higher panels to separate work space, or working in enclosed offices, are regarded as effective improvement measures, whereas introducing natural sounds to mask unwanted sounds seems to be not preferable. There are significant correlations between the evaluation of acoustic environment and office symptoms, including hypersensitivity to loud sounds, easily getting tired and depression. There are also significant correlations between evaluation of various acoustics-related factors and certain statements relating to job satisfaction, including sensitivity to noise, as well as whether conversations could be heard by colleagues. Copyright © 2012 Elsevier B.V. All rights reserved.
The Bacteriostasis Study of Nisin for the Raspberry Health Draft Beer
Sun, Jinxu; Zhu, Hui xia; Guo, Jiping; Xiao, Dong Guang
The raspberry healthy draft beer was obtained by adding the extracting of raspberry into the raw fermentation materials of beer, in order to prolong the shelf life, the different concentrations nisin were added to the the raspberry healthy draft beer, the result shown that nisin could have obvious influence on the shelf life, the shelf life prolonged with nisin concentrations adding, the shelf life raspberry healthy draft beer was 44d after adding 0.02 nisin mg/mL, the shelf life prolonged 36d than blank.
Implications of draft ICRP recommendations: the View of the OECD Nuclear Energy Agency
International Nuclear Information System (INIS)
Magnusson, S.; Lazo, T.
2006-01-01
Full text: The OECD Nuclear Energy Agency has taken an active interest in the work being performed by the International Commission on Radiological Protection (ICRP) to develop a new set of general recommendations. As several key junctures, the Nea, through the lead of its Committee on Radiation Protection and Public Health (C.R.P.P.H.) has performed in-depth analyses of the possible implications that draft ICRP materials, in order to inform policy makers of the regulatory and application implications that would result should draft ICRP Recommendations for a system of radiological protection be published. Comments from the Nea have constructively contributed to the ICRP development process, and it is hoped that the final ICRP recommendations in this area will be developed to best serve the needs of national and international radiation protection policy makers, regulators and implementers. Having assessed and commented on previous drafts, the C.R.P.P.H. has co-ordinated the views of all the relevant standing technical committees within the OECD Nuclear Energy Agency to provide constructive suggestions as to how the text could be usefully improved. Comments were requested from the Nea committees dealing with radioactive waste management, nuclear safety, nuclear regulatory activities, nuclear development and nuclear science. The present paper summarises the results of the C.R.P.P.H. review process related to the new ICRP recommendations. (author)
Indoor climate, psychosocial work environment and symptoms in open-plan offices
DEFF Research Database (Denmark)
Pejtersen, J; Allermann, L; Kristensen, T S
2006-01-01
To study the indoor climate, the psychosocial work environment and occupants' symptoms in offices a cross-sectional questionnaire survey was made in 11 naturally and 11 mechanically ventilated office buildings. Nine of the buildings had mainly cellular offices; five of the buildings had mainly open...... irritation, skin irritation, central nervous system (CNS) symptoms and psychosocial factors. Occupants in open-plan offices are more likely to perceive thermal discomfort, poor air quality and noise and they more frequently complain about CNS and mucous membrane symptoms than occupants in multi......-person and cellular offices. The association between psychosocial factors and office size was weak. Open-plan offices may not be suited for all job types. PRACTICAL IMPLICATION: Open-plan offices may be a risk factor for adverse environmental perceptions and symptoms....
Energy Technology Data Exchange (ETDEWEB)
MCCARTHY, M.M.
1999-08-01
This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.
Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work
International Nuclear Information System (INIS)
Gould, J.
1999-01-01
The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol