  1. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  2. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  3. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  4. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  5. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  6. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  7. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  8. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  9. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  10. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  11. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  12. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  13. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  14. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  15. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  16. Work management administration FY 1995 site support program plan WBS 6.2

    Energy Technology Data Exchange (ETDEWEB)

    Hale, N.S.

    1994-09-01

    Westinghouse Hanford Company`s (WHC) near-term vision is to implement a Site-wide work management program that is consistent from one facility to the other, and can realize workforce efficiencies, minimum down time, and familiarization with facilities uniqueness. Additionally, consistent Hanford Site work management processes can produce meaningful information to be shared complex-wide as the US Department of Energy (DOE) cleans up facilities Site-wide. It is the mission of the WHC Work Management Administration Program to provide guidance and program direction on how to implement consistent and effective work management across the Hanford Site that comply with the DOE and other regulatory requirements. This report describes the steps needed to implement a work management plan at Hanford.

  17. Indonesia's family planning program works toward self-sufficiency.

    Science.gov (United States)

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  18. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  19. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    International Nuclear Information System (INIS)

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  20. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  1. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  2. Analysis of Work Performance of Family Planning Field Workers in Male Family Planning Program in Cilacap District

    OpenAIRE

    Suryani, Untari Fajar; Nurjazuli, Nurjazuli; Arso, Septo Pawelas

    2013-01-01

    Target of MDG's to reach maternal mortality rate of 102/100.000 live-births and infantmortality rate of 23/1000 live-births had been performed by improving maternal health throughincreasing contraceptive prevalence rate and decreasing unmet need. Percentage of male withpermanent birth control in Cilacap district was in the lowest rank, 0.16%. Success of familyplanning program could not be separated from work performance of PLKB (family planning field workers); assessment of PLKB work performa...

  3. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  4. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  5. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  6. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  7. Bottom head failure program plan

    International Nuclear Information System (INIS)

    Meyer, R.O.

    1989-01-01

    Earlier this year the NRC staff presented a Revised Severe Accident Research Program Plan (SECY-89-123) to the Commission and initiated work on that plan. Two of the near-term issues in that plan involve failure of the bottom head of the reactor pressure vessel. These two issues are (1) depressurization and DCH and (2) BWR Mark I Containment Shell Meltthrough. ORNL has developed models for several competing failure mechanisms for BWRs. INEL has performed analytical and experimental work directly related to bottom head failure in connection with several programs. SNL has conducted a number of analyses and experimental activities to examine the failure of LWR vessels. In addition to the government-sponsored work mentioned above, EPRI and FAI performed studies on vessel failure for the Industry Degraded Core Rulemaking Program (IDCOR). EPRI examined the failure of a PWR vessel bottom head without penetrations, as found in some Combustion Engineering reactors. To give more attention to this subject as called for by the revised Severe Accident Research Plan, two things are being done. First, work previously done is being reviewed carefully to develop an overall picture and to determine the reliability of assumptions used in those studies. Second, new work is being planned for FY90 to try to complete a reasonable understanding of the failure process. The review and planning are being done in close cooperation with the ACRS. Results of this exercise will be presented in this paper

  8. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  9. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  10. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  11. Work program analysis - defining the capability/risk plan

    International Nuclear Information System (INIS)

    Hrinivich, W.A.

    2004-01-01

    Bruce Power has developed and implemented an analysis methodology (Work Program Analysis) to assess and address corporate business risk associated with work group capability. Work Program Analysis is proving to be an excellent tool for identifying and supporting key business decisions facing the line and senior management at Bruce Power. The following describes the methodology, its application and the results achieved. (author)

  12. Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    International Nuclear Information System (INIS)

    2010-01-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone No.3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  13. Site Support Program Plan Infrastructure Program

    International Nuclear Information System (INIS)

    1995-01-01

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site's infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford's infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition

  14. Site Support Program Plan Infrastructure Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  15. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  16. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    Science.gov (United States)

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  17. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  18. LANDSCAPE PLANNING IN UKRAINE: THE FIRST LANDSCAPE-PLANNING PROGRAM

    Directory of Open Access Journals (Sweden)

    Leonid Rudenko

    2013-01-01

    Full Text Available The paper presents the results of the first, in Ukraine; project on landscape planning widely accepted in European countries. Under the project implemented in 2010–2013, a landscape-planning program has been developed for the Cherkassy oblast. This is the first document of this kind in Ukraine. The program is mainly based on the experience of the German and Russian schools of landscape planning and on research and assessment conducted by the authors, which allowed identifying approaches to landscape planning, principles of the national policy, and characteristics and potential of environmentally friendly planning in Ukraine. The paper discusses the main phases of the work on the development of the landscape program for the oblast. It also identifies the main stages and key concepts and principles of landscape planning. The paper presents the results of integrated research on the identification and classification of conflicts in land use and the integral concept of the developmental goals for the oblast. The results can be the foundation for adopting management decisions and development of action plans for the lower hierarchal branches.

  19. FY97 Geothermal R&D Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  20. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  1. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  2. 40 CFR 256.05 - Annual work program.

    Science.gov (United States)

    2010-07-01

    ... FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... included by reference in the annual work program: (1) Substate solid waste management plans, (2) Plans for the development of facilities and services, including hazardous waste management facilities and...

  3. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  4. FY85 Program plan for the Defense Transuranic Waste Program (DTWP)

    International Nuclear Information System (INIS)

    1984-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY85 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research and Development (R and D), the organizational interfaces and communication channels for R and D and the establishment of procedures for planning, reporting, and budgeting of all R and D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. The work breakdown structure is reflected graphically immediately following the Administration section and is described in the subsequent narrative. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY85; outyear budget projections are presented for future years

  5. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  6. 40 CFR 35.107 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... and evaluation of performance under the grant agreement. (2) An approvable work plan must specify: (i... and a time frame for their accomplishment; (iv) A performance evaluation process and reporting... environmental program grant if the portions of the Performance Partnership Agreement that serve as all or part...

  7. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  8. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  9. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  10. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  11. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  12. NWTS waste package program plan. Volume II. Program logic networks

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  13. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    International Nuclear Information System (INIS)

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems' ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL's groundwater problems

  14. Planning of optimal work path for minimizing exposure dose during radiation work in radwaste storage

    International Nuclear Information System (INIS)

    Kim, Yoon Hyuk; Park, Won Man; Kim, Kyung Soo; Whang, Joo Ho

    2005-01-01

    Since the safety of nuclear power plant has been becoming a big social issue, the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate dose not depend on the location within a work space, thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation during radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, the developed numerical method and simulation program could be useful tools in the planning of radiation work

  15. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  16. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  17. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  18. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  19. First regional CSM program planned.

    Science.gov (United States)

    1982-09-01

    6 countries in the English-speaking Caribbean (Antigua, Barbados, Dominica, St. Kitts/Nevis, St. Lucia, and St. Vincent) are scheduled to form the 1st regional contraceptive social marketing program. The program will be under the auspices of the Barbados Family Planning Association. By combining resources, contraceptive social marketing should be able to effectively augment family planning activities in smaller countries where individual programs wuld be too costly. The regional program will also determine whether program elements from 1 country in a region are relevant in other countries. The Caribbean region as a whole has experienced a general decline in both crude birth rates and fertility rates during the past 15 years; however, adolescent fertility rates remain high and an average of 46% of the populations of Caribbean countries are under 15 years of age. Although heavy emigration has traditionally curbed population increases, new restrictive immigration laws are expected. Further increases in the working age population will contribute to already high unemployment rates and hinder economic development. The 6 countries selected for the social marketing program are receptive to innovative family planning approaches and have the basic marketing infrastructure required. Community-based distribution programs already in operation in these countries distribute condoms, oral contraceptives, and barrier methods. The success of these programs has plateaued, and there is a need for delivery systems capable of reaching broader segments of the population. The social marketing program will be phased in to ensure local acceptance among national leaders and consumers. The regional program hopes to borrow elements from Jamaica's contraceptive social marketing program to avoid the costs involved in starting a program from scratch. A major innovation will be the use of mass media advertising for contraceptives.

  20. DOE-owned spent nuclear fuel program plan

    International Nuclear Information System (INIS)

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines

  1. DOE-owned spent nuclear fuel program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  2. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  3. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  4. ESnet Program Plan 1994

    Energy Technology Data Exchange (ETDEWEB)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  5. ESnet Program Plan 1994

    International Nuclear Information System (INIS)

    Merola, S.

    1994-01-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet's development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet's development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet's connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking

  6. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  7. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  8. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  9. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  10. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  11. NWTS waste package program plan. Volume I. Program strategy, description, and schedule

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  12. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  13. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  14. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  15. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  16. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  17. The Managers’ Experiential Learning of Program Planning in Active Ageing Learning Centers

    Directory of Open Access Journals (Sweden)

    Chun-Ting Yeh

    2016-12-01

    Full Text Available Planning older adult learning programs is really a complex work. Program planners go through different learning stages and accumulate experiences to be able to undertake the task alone. This study aimed to explore the experiential learning process of older adult learning program planners who work in the Active Ageing Learning Centers (AALCs. Semi-structure interviews were conducted with seven program planners. The findings of this study were identified as follows. 1 Before being a program planner, the participants’ knowledge results from grasping and transforming experience gained from their family, their daily lives and past learning experiences; 2 after being a program planner, the participants’ experiential learning focused on leadership, training in the institute, professional development, as well as involvement in organizations for elderly people; and 3 the participants’ experiential learning outcomes in the older adult learning program planning include: their ability to reflect on the appropriateness and fulfillment of program planning, to apply theoretical knowledge and professional background in the field, and to make plans for future learning and business strategies.

  18. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  19. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  20. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  1. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  2. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  3. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  4. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  5. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  6. N Reactor Deactivation Program Plan

    International Nuclear Information System (INIS)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities · in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually

  7. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  8. Task plan for the US Department of Energy TMI-2 programs

    International Nuclear Information System (INIS)

    1982-10-01

    The Task Plan for the US Department of Energy (DOE) Three Mile Island (TMI) Unit 2 Programs identifies the tasks to be planned and administered by the DOE Technical Integration Office (TIO) in a manner which will maximize the use of available resources, obtain the maximum benefit from the opportunities associated with the TMI-2 cleanup effort, and retrieve generically useful information for addressing some of the key problems and issues facing the nuclear power industry. The Plan identifies tasks in three major program areas where DOE has assumed implementation responsibility. The DOE TMI-2 Programs are: Data Acquisition Program, Waste Immobilization Program, and Reactor Evaluation Program. The plan is intended to serve as a management overview by defining the task objective, benefits, and work scope with respect to prioritization of tasks and utilization of resources

  9. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  10. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  11. Program Planning in Health Professions Education

    Science.gov (United States)

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  12. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  13. Selenide isotope generator for the Galileo mission. Reliability program plan

    International Nuclear Information System (INIS)

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineated herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work

  14. 20 CFR 632.255 - Program planning.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described in...

  15. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  16. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  17. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  18. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  19. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  20. 7 CFR 23.6 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... relationship of this program to ongoing planning and development efforts. (3) The organizational structure for... research program techniques, and organizational structure for planning and conducting each program... separate concise statement describing specific extension projects to be funded under each program. The...

  1. 45 CFR 1355.35 - Program improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program improvement plans. 1355.35 Section 1355.35... plans. (a) Mandatory program improvement plan. (1) States found not to be operating in substantial conformity shall develop a program improvement plan. The program improvement plan must: (i) Be developed...

  2. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  3. Planned Parenthood works with Korean government.

    Science.gov (United States)

    Yang, J M

    1968-01-01

    In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.

  4. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  5. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  6. INSPECT: a package of computer programs for planning and evaluating safeguards inspections

    International Nuclear Information System (INIS)

    Mullen, M.F.

    1980-01-01

    As part of the US Program of Technical Assistance to IAEA Safeguards, PNL has developed a package of computer programs, called INSPECT, that can be used in planning and evaluating safeguards inspections of various types of nuclear facilities. The programs are based on the statistical methods described in Part F of the IAEA Safeguards Technical Manual and can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, and a measure of the effectiveness of the inspection plan. The paper describes the programs, reviews a number of applications, and indicates areas for future work

  7. Programs that work : California case examples

    International Nuclear Information System (INIS)

    Rodgrigues, G.

    2007-01-01

    Examples of programs that work in California with respect to greenhouse gas emissions were discussed. Specifically, Southern California Edison (SCE) was noted as one of the country's largest investor-owned utilities that has provided environmental leadership in this area. Energy, environment, economy, and community were mentioned as being the four value propositions for demand side management (DSM) programs. The environmental benefits of California investor-owned utilities programs were also discussed. Customer participation in SCE's energy efficiency programs was defined as an important measure of success. Other topics that were addressed in the presentation included energy efficiency in the long-term resource plan; ratcheting codes and standards; effective marketing and outreach; residential and non-residential programs; partnership programs; and competitively-selected programs. Measurement, verification and evaluation were noted as being real savings. Initiatives on the horizon such as the California solar initiative and Edison smartconnect were presented. tabs., figs

  8. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  9. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  10. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  11. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  12. Programs that work : California case examples

    Energy Technology Data Exchange (ETDEWEB)

    Rodgrigues, G. [Southern California Edison, Rosemead, CA (United States)

    2007-07-01

    Examples of programs that work in California with respect to greenhouse gas emissions were discussed. Specifically, Southern California Edison (SCE) was noted as one of the country's largest investor-owned utilities that has provided environmental leadership in this area. Energy, environment, economy, and community were mentioned as being the four value propositions for demand side management (DSM) programs. The environmental benefits of California investor-owned utilities programs were also discussed. Customer participation in SCE's energy efficiency programs was defined as an important measure of success. Other topics that were addressed in the presentation included energy efficiency in the long-term resource plan; ratcheting codes and standards; effective marketing and outreach; residential and non-residential programs; partnership programs; and competitively-selected programs. Measurement, verification and evaluation were noted as being real savings. Initiatives on the horizon such as the California solar initiative and Edison smartconnect were presented. tabs., figs.

  13. Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)

    International Nuclear Information System (INIS)

    Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

    1982-01-01

    The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public

  14. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  15. Requirements for an ES and H assurance program at the working levels of organization

    International Nuclear Information System (INIS)

    Tierney, M.S.; Ellingson, A.C.

    1979-07-01

    Means by which the disciplines of quality assurance (QA), reliability (R), and human factors (HF) might be used to the advantage of Environment, Safety, and Health (ES and H) programs are being investigated. A generalized model assurance program, based on QA, R, and HF principles but specifically tailored to ES and H program needs, has been developed. Current studies address implementation of the model assurance program at the working levels of organization. It appears that the only way practicability at the working level can be determined is by the case study method. The present study represents a first step in the application of such a procedure. An attempt was made to approach the question of practicability by first constructing a generic ES and H assurance plan for working-level organizations that is based upon the more widely-applied model plan and studies mentioned earlier. Then the elements of this generic working-level plan were compared with the practices of an existing R and D organization at Sandia Laboratories, Albuquerque. Some of the necessary steps were taken to convert these practices to those required by the generic plan in order to gain a measure of the feasibility, cost, and some of the possible benefits of such a conversion. Partial results of one case study are presented, and some generalizations that emerge regarding the structure of an idealized working-level ES and H plan are made

  16. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    limited available resources of the suppliers to execute the work. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned using a dedicated core team, and involved much more involvement of the suppliers to ensure feasibility of the proposed program of work and more detailed specification of the required resources. Priorities for executing the diverse activities in the Program were originally set using criteria based on the risks that the liabilities presented to health and safety, to the environment and to AECL's ability to meet its obligations as the owner-operator of licensed nuclear sites. The LMU later recognized that the decision criteria should also explicitly include the value gained in reducing the risks and liabilities for expended funds. Greater consideration should be given to mitigating risks to the execution of the Program that might materialize. In addition, licensing strategies and processes should be better-defined, and waste characterization methods and disposition pathways would have to be put in place, or clearly identified, to deal with the wastes the Program would generate before many of the planned activities could be initiated. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and activities. These include developing a more formal procedure for setting priorities of the different parts of the Program, preparing an Integrated Waste Plan to identify the optimal suite of support facilities to be constructed, the creation of a series of 'pre-project initiation' procedures and documents to guide the development

  17. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  18. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  19. In situ vitrification laboratory-scale test work plan

    International Nuclear Information System (INIS)

    Nagata, P.K.; Smith, N.L.

    1991-05-01

    The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs

  20. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  1. Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3

    International Nuclear Information System (INIS)

    Loika, E.F.

    1994-01-01

    This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate

  2. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  3. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  4. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  5. Plans for the NKS-program 1998-2001

    International Nuclear Information System (INIS)

    Bennerstedt, T.

    1999-08-01

    The present report is a comprehensive compilation of the adopted NKS project plans for the sixth four-year period, 1998-2001. Most of the plans are in English. One is in both English and Danish. One is in Norwegian, with a brief summary in English. Only two of the six appendices are in English. In spite of this, it is believed that the report will serve as a valuable source of information not only to those actually active in or closely following the NKS work, but also the international scientific community, e.g., within EU and in the Baltic States. The research program incorporates reactor safety, radioactive waste, emergency preparedness, radioecology, cross-disciplinary studies, and information issues. The necessary administrative support program, including the NKS Secretariat, is not described herein. Neither is the aim, scope or organization of NKS, since this has been covered elsewhere. (EHS)

  6. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Science.gov (United States)

    2011-02-09

    ... Plan Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Program implementation with request for comments. SUMMARY: SBA is introducing a new Dealer Floor Plan Pilot Program to make... Plan Pilot Program was created in the Small Business Jobs Act of 2010. Under the new Dealer Floor Plan...

  7. Performance Demonstration Program Plan for the WIPP Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-02-01

    The Performance Demonstration Program is designed to ensure that compliance with the Quality Assurance Objective, identified in the Quality Assurance Program Plan for the WIPP Experimental-Waste Characterization Program (QAPP), is achieved. This Program Plan is intended for use by the WPO to assess the laboratory support provided for the characterization of WIPP TRU waste by the storage/generator sites. Phase 0 of the Performance Demonstration Program encompasses the analysis of headspace gas samples for inorganic and organic components. The WPO will ensure the implementation of this plan by designating an independent organization to coordinate and provide technical oversight for the program (Program Coordinator). Initial program support, regarding the technical oversight and coordination functions, shall be provided by the USEPA-ORP. This plan identifies the criteria that will be used for the evaluation of laboratory performance, the responsibilities of the Program Coordinator, and the responsibilities of the participating laboratories. 5 tabs

  8. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  9. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  10. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  11. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  12. Performance-based planning and programming guidebook.

    Science.gov (United States)

    2013-09-01

    "Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...

  13. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  14. Evaluation of the Navy Master Planning Program

    Science.gov (United States)

    1976-05-01

    Navy planning directives, interviews with Navy planning personnel, researc " of applicable literature on planning and program evaluation, and the...master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63

  15. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  16. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  17. Subseabed-disposal program: systems-analysis program plan

    International Nuclear Information System (INIS)

    Klett, R.D.

    1981-03-01

    This report contains an overview of the Subseabed Nuclear Waste Disposal Program systems analysis program plan, and includes sensitivity, safety, optimization, and cost/benefit analyses. Details of the primary barrier sensitivity analysis and the data acquisition and modeling cost/benefit studies are given, as well as the schedule through the technical, environmental, and engineering feasibility phases of the program

  18. The Reuni Program and Challenges for Professional Education in Social Work

    Directory of Open Access Journals (Sweden)

    Kátia Regina de Souza Lima

    2013-11-01

    Full Text Available This article analyzes the implementation of the Program for Support to Plans for the Restructuring and Expansion of Federal Universities (Reuni, particularly concerning the expansion of the number of openings for students in the schools of Social Work at federal universities. It identifies Reuni as an expression of the expansion policy underway in Brazil in the first decade of the new century. The text analyzes the political and pedagogical significance of the program, it’s impacts on the intensification of the work of teaching and on professional education in Social Work.

  19. Single Shell Tank (SST) Program Plan

    International Nuclear Information System (INIS)

    HAASS, C.C.

    2000-01-01

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000

  20. Single Shell Tank (SST) Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    HAASS, C.C.

    2000-03-21

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000.

  1. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  2. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  3. Lawrence Livermore National Laboratory (LLNL) Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    Heckman, R.A.; Tang, W.R.

    1989-01-01

    This Program Plan document describes the background of the Waste Minimization field at Lawrence Livermore National Laboratory (LLNL) and refers to the significant studies that have impacted on legislative efforts, both at the federal and state levels. A short history of formal LLNL waste minimization efforts is provided. Also included are general findings from analysis of work to date, with emphasis on source reduction findings. A short summary is provided on current regulations and probable future legislation which may impact on waste minimization methodology. The LLN Waste Minimization Program Plan is designed to be dynamic and flexible so as to meet current regulations, and yet is able to respond to an everchanging regulatory environment. 19 refs., 12 figs., 8 tabs

  4. Educational program emergency planning.

    Science.gov (United States)

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  5. Program plan for the resolution of tank vapor issues

    International Nuclear Information System (INIS)

    Osborne, J.W.

    1992-09-01

    The purpose of this document is to provide a detailed description of the priorities, logic, work breakdown structure (WBS), task descriptions, and program milestones required for the resolution of tank vapor issues associated with the single-shell tanks (SST) and double-shell tanks (DST). The primary objective of this plan is to determine whether a health (personnel exposure) and/or safety (flammability) hazard exists. This plan is focused upon one waste tank, 241-C-103, but contains all elements required to bring the vapor issues to resolution

  6. Planning aquatic ecosystem restoration monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  7. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    International Nuclear Information System (INIS)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation

  8. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    Energy Technology Data Exchange (ETDEWEB)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation.

  9. Case report: a work simulation program for a manual worker with a fracture injury.

    Science.gov (United States)

    Chan, Chi-Chung; Chow, Jonathan H.W.

    2000-01-01

    Work rehabilitation programs targeting different client groups are available in nearly all major hospital occupational therapy departments in Hong Kong. Clients receiving work rehabilitation are referred from various out-patient clinics and other occupational therapists. Those clients experience limitation in work after their injuries or diseases and plan to return to work after rehabilitation. Program objectives are 1) to assist clients to reach maximum work capacity as rapidly as possible 2) to ensure clients return to work safely 3) to improve clients' work readiness. This case report describes an individualized work simulation program at a general hospital in Hong Kong provided for a typical client who is preparing to return to his worker role. Specific job analysis, goals and program rationale for the client are discussed.

  10. FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-11-01

    This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

  11. Use of a radiation therapy treatment planning computer in a hospital health physics program

    International Nuclear Information System (INIS)

    Addison, S.J.

    1984-01-01

    An onsite treatment planning computer has become state of the art in the care of radiation therapy patients, but in most installations the computer is used for therapy planning a diminutive amount of the day. At St. Mary's Hospital, arrangements have been negotiated for part time use of the treatment planning computer for health physics purposes. Computerized Medical Systems, Inc. (CMS) produces the Modulex radiotherapy planning system which is programmed in MUMPS, a user oriented language specially adapted for handling text string information. St. Mary's Hospital's CMS computer has currently been programmed to assist in data collection and write-up of diagnostic x-ray surveys, meter calibrations, and wipe/leak tests. The computer is setup to provide timely reminders of tests and surveys, and billing for consultation work. Programs are currently being developed for radionuclide inventories. Use of a therapy planning computer for health physics purposes can enhance the radiation safety program and provide additional grounds for the acquisition of such a computer system

  12. [Some psychological problems in family planning work].

    Science.gov (United States)

    Chen, J

    1983-11-29

    Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.

  13. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    Energy Technology Data Exchange (ETDEWEB)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  14. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS number-sign 1.4

    International Nuclear Information System (INIS)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan

  15. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  16. Standard Review Plan Update and Development Program

    International Nuclear Information System (INIS)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures

  17. Standard Review Plan Update and Development Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  18. Working program for deep borehole investigations. HDB-6,7,8, borehole

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Takahashi, Kazuharu; Ishii, Eiichi; Takeuchi, Ryuji; Sasaki, Manabu; Kunimaru, Takanori; Eki, Nobuhiro; Matsui, Hiroya

    2003-08-01

    optimized program for deep borehole (HDB-6, 7, 8) investigations has been drawn-up. This program addresses the general issues and provides input to the subsequent investigation programs and design for the shaft and experimental drifts. This document mainly describes the planned working program for the HDB-6, 7, 8 borehole investigations including associated laboratory programs during and after drilling. The working program is divided into the following investigation fields: borehole drilling geology, geophysics, hydrogeology, hydrochemistry, rock mechanics and long-term monitoring. Post-HDB borehole investigations; a VSP (Vertical Seismic Profiling) survey are planned in the surface-based investigations phase. (author)

  19. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  20. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  1. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  2. The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145

    International Nuclear Information System (INIS)

    Patterson, Russ; Klein, Thomas; Van Luik, Abraham

    2013-01-01

    The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance

  3. 30 CFR 75.161 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...

  4. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  5. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  6. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  7. DOE Region 6 Radiological Assistance Program plan. Revision 1

    International Nuclear Information System (INIS)

    Jakubowski, F.M.

    1995-11-01

    The US Department of Energy (DOE) has sponsored a Radiological Assistance Program (RAP) since the 1950's. The RAP is designed to make DOE resources available to other DOE facilities, state, tribal, local, private businesses, and individuals for the explicit purpose of assisting during radiological incidents. The DOE has an obligation, through the Atomic Energy Act of 1954, as amended, to provide resources through the Federal Radiological Emergency Response Plan (FRERP, Nov. 1985) in the event of a radiological incident. Toward this end, the RAP program is implemented on a regional basis, and has planned for an incremental response capability with regional coordination between states and DOE response elements. This regional coordination is intended to foster a working relationship between DOE radiological assistance elements and those state, tribal, and local agencies responsible for first response to protect public health and safety

  8. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  9. Preretirement Programs within Service Firms: Existing and Planned Programs.

    Science.gov (United States)

    Siegel, Sidney R.; Rives, Janet M.

    1980-01-01

    A study of 300 nonmanufacturing firms' current and projected preretirement programs indicated that (1) personnel departments have primary responsibility for existing programs, (2) focus is changing from financial planning to psychological counseling, and (3) such programs benefit the company as well as the employee. (SK)

  10. Migration plans and hours of work in Malaysia.

    Science.gov (United States)

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  11. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  12. 49 CFR 613.200 - Statewide transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  13. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  14. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  15. 25 CFR 87.9 - Programming aspects of plans.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  16. Evaluation of natural factors in town planning and strategic programming of development local community

    Directory of Open Access Journals (Sweden)

    Lješević Milutin

    2009-01-01

    Full Text Available The natural components are very important aspect of human life and work. The nature is place is place wherever to happened majority of human activity, working vacation and survival, although are some areas is technicality and desecrating to denaturalization. Because of that, it is necessary to study all valid of natural factors, when to programs new contents which are in function of human living, work or holiday. We can find great differences in exploration of some natural factors depending of level in programming of development (general or detail urban planning and strategic programming or local community or projecting. .

  17. Cost-effectiveness of USAID's regional program for family planning in West Africa.

    Science.gov (United States)

    Shepard, Donald S; Bail, Richard N; Merritt, C Gary

    2003-06-01

    Between 1994 and 1996, the United States Agency for International Development (USAID) closed 23 country missions worldwide, of which eight were in West and Central Africa. To preserve United States support for family planning and reproductive health in four countries in that region, USAID created a subregional program through a consortium of US-based groups that hired mainly African managers and African organizations. This study assesses cost-effectiveness of the program through an interrupted time-series design spanning the 1990s and compares cost-effectiveness in four similar countries in which mission-based programs continued. Key indicators include costs, contraceptive prevalence rates, and imputed "women-years of protection." The study found that, taking into account all external financing for population and family planning, the USAID West Africa regional approach generated women-years of protection at one-third the cost of the mission-based programs. This regional approach delivered family planning assistance in West Africa cost-effectively, and the findings suggest that regional models may work well for many health and population services in small countries.

  18. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  19. Preparation of a program for the independent verification of the brachytherapy planning systems calculations

    International Nuclear Information System (INIS)

    V Carmona, V.; Perez-Calatayud, J.; Lliso, F.; Richart Sancho, J.; Ballester, F.; Pujades-Claumarchirant, M.C.; Munoz, M.

    2010-01-01

    In this work a program is presented that independently checks for each patient the treatment planning system calculations in low dose rate, high dose rate and pulsed dose rate brachytherapy. The treatment planning system output text files are automatically loaded in this program in order to get the source coordinates, the desired calculation point coordinates and the dwell times when it is the case. The source strength and the reference dates are introduced by the user. The program allows implementing the recommendations about independent verification of the clinical brachytherapy dosimetry in a simple and accurate way, in few minutes. (Author).

  20. Abandoned works program

    International Nuclear Information System (INIS)

    Arnott, A.

    2007-01-01

    Thousands of improperly abandoned or decommissioned oil and gas wells are threatening the purity of Ontario's source water. This presentation discussed an abandoned works program developed by the Ontario Ministry of Natural Resources. The abandoned works program was established in 2005 in order to plug old oil and gas wells. The program was designed to create a list of abandoned wells, develop a coherent policy, and formulate procurement and contracting protocols. Abandoned wells are defined as wells drilled prior to 1963 with no operator other than the current landowner. There are currently over 200 prioritized wells on the list. Twenty-six contracts have been issued for a total of 33 wells, and 19 wells have been plugged since the program's field operations began in 2006. However, the program is often challenged by the difficulties associated with determining where the wells are located. Many of the wells have been cut off and buried, and access is often dependent on weather conditions and road restrictions. There is also a shortage of contractors who have experience working with older wells. It was concluded that the program will expand by obtaining further funding and modifying its qualification criteria. tabs., figs

  1. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  2. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    Science.gov (United States)

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  3. PLAN Bicol, Philippines: health manpower development program in action.

    Science.gov (United States)

    Lind, K

    1994-06-01

    PLAN Bicol in the Philippines is a community based Health Manpower Development Program (HMDP) geared toward training and mobilization of indigenous health practitioners, providing infrastructural and logistical support to individual families, and educating the community about health, nutrition, and the environment. The field officer recommends at the initiation of a project that program staff have roles that are well defined. New programs should be introduced to the community first and should involve the community in the planning stages. The HMDP program is directed to 38 villages located around national parks that have suffered from deforestation. Community health issues are malnutrition, low immunization, and lack of access to health services. HMDP established a training program for auxiliary health workers (AHWs), who make a commitment to return to their villages after training. Midwives are being trained at local schools. Village houses are being built and repaired; water systems and sanitary toilet facilities are being installed. Village health stations have been constructed and equipped with basic medicines, supplies, and equipment, and are open 5 days a week. Health education classes inform the community about nutrition and health. The problems at inception were the unwillingness of field staff to participate in the program and a high drop out rate among AHWs. Problems were worked out as the program progressed. Facilitative factors are the close coordination with the provincial health office, community acceptance, and the availability of qualified people.

  4. Return to work programs are becoming a business priority

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2001-06-01

    Improved safety planning and operational procedures in the offshore industry, based on lessons learned from accidents offshore, are discussed. The emphasis in this instance is on the 'return-to-work' (RTW) program which consists of a formal set of processes whose goal is to minimize the impact of an impairment or disability on an individual's capacity to work. The program is designed to assist workers to return to their jobs or to an alternate suitable job, to mitigate the human and financial cost for both the worker and the employer. RTW programs are said to have assumed greater importance recently because of globalization of the economy and downsizing, and the increased pressure on organizations to decrease costs to stay competitive. The longer work-week for the remaining employees and increase in the average age of the workforce which tend to increase recovery time from an injury, are other factors contributing to the demand for increased safety in the work place and the increased popularity of structured and regulated return-to-work programs in all sectors of industry. Retained seniority, pay and benefits, along with maintaining self-worth, family stability, and social ties, are suggested as the principal benefit to workers. Employers would benefit from the ability to retain skilled workers, minimize production losses, and minimize the need to recruit and train new workers, or to retrain current employees to perform new tasks. To be successful, the employer must commit money and resources for the program, and employees have to be fully aware of the benefits of an RTW program. It appears that pending legislation making workplace accommodation mandatory, an RTW program will soon become a business essential for employers. At the same time, rising health care costs provide further substantiation for more structured approaches to reduce claims and absenteeism from the workplace.

  5. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  6. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... statement including identification of high priority knowledge, skill, and organization needs for rural..., which in turn support State development strategies. (3) A concise statement of the organization structure for planning and conducting the program funded under section 503(b)(2). (4) A plan for evaluating...

  7. WIPP facility representative program plan

    International Nuclear Information System (INIS)

    1994-01-01

    This plan describes the Department of Energy (DOE), Carlsbad Area Office (CAO) facility representative (FR) program at the Waste Isolation Pilot Plant (WIPP). It provides the following information: (1) FR and support organization authorities and responsibilities; (2) FR program requirements; and (3) FR training and qualification requirements

  8. The Transuranic Waste Program's integration and planning activities and the contributions of the TRU partnership

    International Nuclear Information System (INIS)

    Harms, T.C.; O'Neal, W.; Petersen, C.A.; McDonald, C.E.

    1994-02-01

    The Technical Support Division, EM-351 manages the integration and planning activities of the Transuranic Waste Program. The Transuranic Waste Program manager provides transuranic waste policy, guidance, and issue resolution to Headquarters and the Operations Offices. In addition, the program manager is responsible for developing and implementing an integrated, long-range waste management plan for the transuranic waste system. A steering committee, a core group of support contractors, and numerous interface working groups support the efforts of the program manager. This paper provides an overview of the US Department of Energy's transuranic waste integration activities and a long-range planning process that includes internal and external stakeholder participation. It discusses the contributions and benefits provided by the Transuranic Partnership, most significantly, the integration activities and the body of data collected and assembled by the Partnership

  9. 30 CFR 77.107-1 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section... COAL MINES Qualified and Certified Persons § 77.107-1 Plans for training programs. Each operator must..., a program or plan setting forth what, when, how, and where the operator will train and retrain...

  10. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  11. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  12. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  13. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  14. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  15. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    Ashwood, T.L.; Sample, B.E.; Suter, G.W. II; Turner, M.G.; Loar, J.M.; Barnthouse, L.W.

    1994-08-01

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  16. Characterization program management plan for Hanford K Basin spent nuclear fuel

    International Nuclear Information System (INIS)

    Lawrence, L.A.

    1998-01-01

    The management plan developed to characterize the K Basin Spent Nuclear Fuel was revised to incorporate actions necessary to comply with the Office of Civilian Radioactive Waste Management Quality Assurance Requirements Document 0333P. This plan was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the spent nuclear fuels stored at the Hanford K Basins. This revision to the Program Management Plan replaces Westinghouse Hanford Company with Duke Engineering and Services Hanford, Inc., updates the various activities where necessary, and expands the Quality Assurance requirements to meet the applicable requirements document. Characterization will continue to utilize the expertise and capabilities of both organizations to support the Spent Nuclear Fuels Project goals and objectives. This Management Plan defines the structure and establishes the roles for the participants providing the framework for Duke Engineering and Services Hanford, Inc. and Pacific Northwest National Laboratory to support the Spent Nuclear Fuels Project at Hanford

  17. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    International Nuclear Information System (INIS)

    Young, C.L.

    1994-01-01

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items

  18. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task

    International Nuclear Information System (INIS)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI ampersand SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI ampersand SI field task must include (1) the general health and safety program plan for all WAG 2 RI ampersand SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169

  19. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  20. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  1. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  2. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  3. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    International Nuclear Information System (INIS)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991

  4. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  5. Virtual reality based support system for layout planning and programming of an industrial robotic work cell.

    Directory of Open Access Journals (Sweden)

    Hwa Jen Yap

    Full Text Available Traditional robotic work cell design and programming are considered inefficient and outdated in current industrial and market demands. In this research, virtual reality (VR technology is used to improve human-robot interface, whereby complicated commands or programming knowledge is not required. The proposed solution, known as VR-based Programming of a Robotic Work Cell (VR-Rocell, consists of two sub-programmes, which are VR-Robotic Work Cell Layout (VR-RoWL and VR-based Robot Teaching System (VR-RoT. VR-RoWL is developed to assign the layout design for an industrial robotic work cell, whereby VR-RoT is developed to overcome safety issues and lack of trained personnel in robot programming. Simple and user-friendly interfaces are designed for inexperienced users to generate robot commands without damaging the robot or interrupting the production line. The user is able to attempt numerous times to attain an optimum solution. A case study is conducted in the Robotics Laboratory to assemble an electronics casing and it is found that the output models are compatible with commercial software without loss of information. Furthermore, the generated KUKA commands are workable when loaded into a commercial simulator. The operation of the actual robotic work cell shows that the errors may be due to the dynamics of the KUKA robot rather than the accuracy of the generated programme. Therefore, it is concluded that the virtual reality based solution approach can be implemented in an industrial robotic work cell.

  6. Virtual reality based support system for layout planning and programming of an industrial robotic work cell.

    Science.gov (United States)

    Yap, Hwa Jen; Taha, Zahari; Dawal, Siti Zawiah Md; Chang, Siow-Wee

    2014-01-01

    Traditional robotic work cell design and programming are considered inefficient and outdated in current industrial and market demands. In this research, virtual reality (VR) technology is used to improve human-robot interface, whereby complicated commands or programming knowledge is not required. The proposed solution, known as VR-based Programming of a Robotic Work Cell (VR-Rocell), consists of two sub-programmes, which are VR-Robotic Work Cell Layout (VR-RoWL) and VR-based Robot Teaching System (VR-RoT). VR-RoWL is developed to assign the layout design for an industrial robotic work cell, whereby VR-RoT is developed to overcome safety issues and lack of trained personnel in robot programming. Simple and user-friendly interfaces are designed for inexperienced users to generate robot commands without damaging the robot or interrupting the production line. The user is able to attempt numerous times to attain an optimum solution. A case study is conducted in the Robotics Laboratory to assemble an electronics casing and it is found that the output models are compatible with commercial software without loss of information. Furthermore, the generated KUKA commands are workable when loaded into a commercial simulator. The operation of the actual robotic work cell shows that the errors may be due to the dynamics of the KUKA robot rather than the accuracy of the generated programme. Therefore, it is concluded that the virtual reality based solution approach can be implemented in an industrial robotic work cell.

  7. Virtual Reality Based Support System for Layout Planning and Programming of an Industrial Robotic Work Cell

    Science.gov (United States)

    Yap, Hwa Jen; Taha, Zahari; Md Dawal, Siti Zawiah; Chang, Siow-Wee

    2014-01-01

    Traditional robotic work cell design and programming are considered inefficient and outdated in current industrial and market demands. In this research, virtual reality (VR) technology is used to improve human-robot interface, whereby complicated commands or programming knowledge is not required. The proposed solution, known as VR-based Programming of a Robotic Work Cell (VR-Rocell), consists of two sub-programmes, which are VR-Robotic Work Cell Layout (VR-RoWL) and VR-based Robot Teaching System (VR-RoT). VR-RoWL is developed to assign the layout design for an industrial robotic work cell, whereby VR-RoT is developed to overcome safety issues and lack of trained personnel in robot programming. Simple and user-friendly interfaces are designed for inexperienced users to generate robot commands without damaging the robot or interrupting the production line. The user is able to attempt numerous times to attain an optimum solution. A case study is conducted in the Robotics Laboratory to assemble an electronics casing and it is found that the output models are compatible with commercial software without loss of information. Furthermore, the generated KUKA commands are workable when loaded into a commercial simulator. The operation of the actual robotic work cell shows that the errors may be due to the dynamics of the KUKA robot rather than the accuracy of the generated programme. Therefore, it is concluded that the virtual reality based solution approach can be implemented in an industrial robotic work cell. PMID:25360663

  8. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  9. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  10. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  11. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  12. 45 CFR 235.62 - State plan requirements for training programs.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false State plan requirements for training programs. 235... ADMINISTRATION OF FINANCIAL ASSISTANCE PROGRAMS § 235.62 State plan requirements for training programs. A State plan under title I, IV-A, X, XIV, or XVI (AABD) of the Act must provide for a training program for...

  13. Planning a New Education and Outreach Program Based on Past Experiences

    Science.gov (United States)

    Prescott, W. H.; Eriksson, S. C.

    2004-12-01

    In 2004, UNAVCO, a geodetic research consortium, celebrated its 20th birthday and hired its first Education and Outreach Coordinator. UNAVCO has informally reached out to various constituents such as geodetic researchers, undergraduate and graduate students, and K-12 teachers through web-based mapping tools, short courses, and one-to-one training on research equipment. A strategically planned and implemented Education and Outreach Program will, by definition, depend on the organization's leadership and on the experience of the people leading such a program. Based on 39 years of combined experience, here are some lessons-learned that will inform UNAVCO's efforts. E & O should focus on what is special and unique to our organization. UNAVCO supports high precision, GPS, geodetic research as its primary mission. Define our audience. UNAVCO serves the research scientists at the member institutions. Do we have a broader goal of helping in the education of undergraduates? Is our work relevant in middle and secondary school? Include the audience in planning what we will do. A two-way dialogue to determine the most effective education and outreach products must balance what scientists think the audience needs and having the audience learn about a subject to help in making decisions. Involve the scientists and decision-makers in the process to develop ownership. Having people `buy in' from the beginning is important for participation, advocacy, and finding long term resources. Decide on quality and quantity. Is it important to serve large numbers of people? Would a small program that focuses on a few individuals over a long period of time serve the organization's goals better? What do we need from an E & O program? Being explicit about what an organization needs from E & O helps define what activities it will do. Does UNAVCO need visibility with members? Does the membership need help with `broader impacts'? Does UNAVCO see itself serving its members or being a `good citizen

  14. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  15. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  16. Strategic planning in an academic radiation medicine program.

    Science.gov (United States)

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  17. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  18. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  19. 7 CFR 22.304 - Multiyear planning and programming.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  20. Characterization Program Management Plan for Hanford K Basin Spent Nuclear Fuel (SNF) (OCRWM)

    International Nuclear Information System (INIS)

    BAKER, R.B.; TRIMBLE, D.J.

    2000-01-01

    The management plan developed to characterize the K Basin spent nuclear fuel (SNF) and sludge was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the SNF stored at the Hanford K Basins. The plan also addressed necessary characterization for the removal, transport, and storage of the sludge from the Hanford K Basins. This plan was revised in 1999 (i.e., Revision 2) to incorporate actions necessary to respond to the deficiencies revealed as the result of Quality Assurance surveillances and audits in 1999 with respect to the fuel characterization activities. Revision 3 to this Program Management Plan responds to a Worker Assessment resolution determined in Fical Year 2000. This revision includes an update to current organizational structures and other revisions needed to keep this management plan consistent with the current project scope. The plan continues to address both the SNF and the sludge accumulated at K Basins. Most activities for the characterization of the SNF have been completed. Data validation, Office of Civilian Radioactive Waste Management (OCRWM) document reviews, and OCRWM data qualification are the remaining SNF characterization activities. The transport and storage of K Basin sludge are affected by recent path forward revisions. These revisions require additional laboratory analyses of the sludge to complete the acquisition of required supporting engineering data. Hence, this revision of the management plan provides the overall work control for these remaining SNF and sludge characterization activities given the current organizational structure of the SNF Project

  1. Women's experiences after Planned Parenthood's exclusion from a family planning program in Texas.

    Science.gov (United States)

    Woo, C Junda; Alamgir, Hasanat; Potter, Joseph E

    2016-04-01

    We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006-2010 (NSFG). (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Requiring low-income family planning patients to switch healthcare providers has adverse consequences. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  3. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  4. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    Science.gov (United States)

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  5. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  6. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  7. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  8. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  9. Strategic planning in an academic radiation medicine program

    Science.gov (United States)

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  10. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  11. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  12. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  13. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  14. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  15. Financial services FY 1995 site support program plan WBS 6.10.4

    Energy Technology Data Exchange (ETDEWEB)

    Vodney, E.P.

    1994-09-01

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  16. Techniques for overcoming community resistance to family planning programs.

    Science.gov (United States)

    Palley, H A

    1968-01-01

    Methods of overcoming resistance to publicly subsidized family planning programs are discussed. The main sources of opposition include groups that oppose family planning for moral reasons, and those who object to the spending of government funds to provide services and information. Such opposition can be weakened by indicating that family planning clinics fulf: 11 important medical needs. Presenting social justification for family planning can help to lower oppostion. In order to secure participation in the programs by low income groups it is essential to have community leaders involved in policy decisions and to use indigenous community paraprofessionals in the clinics. A coalition of representatives of the poor community and the health and welfare system, aided by the community organization, can lead to an effective family planning program.

  17. Planning-Programming-Budgeting Systems.

    Science.gov (United States)

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  18. Federal Employees Health Benefits Program (FEHBP) Plan Information

    Data.gov (United States)

    Office of Personnel Management — A list of all Federal Employees Health Benefits Program (FEHBP) plans available in each state, as well as links to the plan brochures, changes for each plan from the...

  19. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  20. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    International Nuclear Information System (INIS)

    Kinney, Mike; Breen, Kevin

    2008-01-01

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities

  1. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....

  3. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  4. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  5. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  6. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  7. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Newsom, H.C.

    1999-01-01

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted

  8. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  9. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  10. Balanced program plan. Volume 10. Fusion: analysis for biomedical and environmental research

    International Nuclear Information System (INIS)

    Hungate, F.P.

    1976-06-01

    Development of the Balanced Program Plan for analysis for biomedical and environmental research was initiated in the spring of 1975. The goal was a redefinition of research efforts and priorities to meet ERDA's requirements for a program of health and environmental research to support the development and commercialization of energy technologies. As part of the Balanced Program planning effort the major ERDA-supported multidisciplinary laboratories were assigned responsibility for analyzing the research needs of each of nine energy technologies and describing a research program to meet these needs. The staff of the Division of Biomedical and Environmental Research was assigned the task of defining a research program addressed to each of five biomedical and environmental research categories (characterization, measurement and monitoring; physical and chemical processes and effects; health effects; ecological effects; and integrated assessment and socioeconomic processes and effects) applicable to all energy technologies. The first drafts of these documents were available for a work-shop in June 1975 at which the DBER staff and scientists from the laboratories developed a comprehensive set of program recommendations. Pacific Northwest Laboratory was assigned responsibility for defining research needs and a recommended research program for fusion and fission technologies. This report, Volume 10, presents the input for fusion

  11. Review and summary of Solar Thermal Conversion Program planning assistance

    Energy Technology Data Exchange (ETDEWEB)

    1975-06-01

    The Solar Thermal Conversion Program comprises a major part of the national solar energy program which must be continuously reviewed and modified where necessary. Modifications are typically required to reflect technical achievements and uncertainties which arise from within the program or from other technical programs, changes in budgets available for supporting the program as well as internal program funding priorities, changing goals such as through acceleration or stretch-out of the program schedule, significant organizational changes involving responsible governmental agencies, the introduction of new project management support contractors, and required budget or schedule changes occurring within individual projects that make up the Solar Thermal Conversion Program. The Aerospace Corporation has provided data to assist in planning, review, coordination, and documentation of the overall Solar Thermal Conversion Program. The Solar Thermal Conversion Program Plan is described in detail. Sections 2.0 through 5.0 cover the discussion and detail planning covering the objectives, justification, basic and alternative plans, budgets, and schedules for the Solar Thermal sub-unit portion of the Solar Electric Applications effort. Appendices B1, B2, and B3 include the March 21, March 28, and April 5, 1975, Program Plan submissions of the complete Solar Electric Applications effort. In Appendix B the Solar Thermal, Solar Photovoltaic, Wind Energy, and Ocean Thermal sub-unit texts have been condensed and formatted for integration in the overall ERDA budget package. (WHK)

  12. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  13. Natural and accelerated bioremediation research program plan

    International Nuclear Information System (INIS)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE's Office of Environmental Management (EM). The program builds on OHER's tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER's and Office of Energy Research's (OER's) commitment to supporting DOE's environmental management mission and the belief that bioremediation is an important part of the solution to DOE's environmental problems

  14. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  15. Low-level radioactive waste research program plan

    International Nuclear Information System (INIS)

    O'Donnell, E.; Lambert, J.

    1989-11-01

    The Waste Management Branch, Division of Engineering, Office of Nuclear Regulatory Research, has developed a strategy for conducting research on issues of concern to the US Nuclear Regulatory Commission (NRC) in its efforts to ensure safe disposal of low-level radioactive waste (LLW). The resulting LLW research program plan provides an integrated framework for planning the LLW research program to ensure that the program and its products are responsive and timely for use in NRC's LLW regulatory program. The plan discusses technical and scientific issues and uncertainties associated with the disposal of LLW, presents programmatic goals and objectives for resolving them, establishes a long-term strategy for conducting the confirmatory and investigative research needed to meet these goals and objectives, and includes schedules and milestones for completing the research. Areas identified for investigation include waste form and other material concerns, failure mechanisms and radionuclide releases, engineered barrier performance, site characterization and monitoring, and performance assessment. The plan proposes projects that (1) analyze and test actual LLW and solidified LLW under laboratory and field conditions to determine leach rates and radionuclide releases, (2) examine the short- and long-term performance of concrete-enhanced LLW burial structures and high-integrity containers, and (3) attempt to predict water movement and contaminant transport through low permeability saturated media and unsaturated porous media. 4 figs., 3 tabs

  16. Project quality assurance plan for research and development services provided by Oak Ridge National Laboratory in support of the Hanford Grout Disposal Program

    Energy Technology Data Exchange (ETDEWEB)

    Spence, R.D.; Gilliam, T.M.

    1991-11-01

    This Project Quality Assurance Plan (PQAP) is being published to provide the sponsor with referenceable documentation for work conducted in support of the Hanford WHC Grout Disposal Program. This plan, which meets NQA-1 requirements, is being applied to work performed at Oak Ridge National Laboratory (ORNL) during FY 1991 in support of this program. It should also be noted that with minor revisions, this plan should be applicable to other projects involving research and development that must comply with NQA-1 requirements.

  17. Project quality assurance plan for research and development services provided by Oak Ridge National Laboratory in support of the Hanford Grout Disposal Program

    International Nuclear Information System (INIS)

    Spence, R.D.; Gilliam, T.M.

    1991-11-01

    This Project Quality Assurance Plan (PQAP) is being published to provide the sponsor with referenceable documentation for work conducted in support of the Hanford WHC Grout Disposal Program. This plan, which meets NQA-1 requirements, is being applied to work performed at Oak Ridge National Laboratory (ORNL) during FY 1991 in support of this program. It should also be noted that with minor revisions, this plan should be applicable to other projects involving research and development that must comply with NQA-1 requirements

  18. Work-Family Planning Attitudes among Emerging Adults

    Science.gov (United States)

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  19. FFTF-cycle 10 program and future plan

    Science.gov (United States)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  20. Development of a system to verify the programs used for planning of photon beams teletherapy

    International Nuclear Information System (INIS)

    Ocariz Ayala, Victor Daniel

    2004-12-01

    The main objective of radiotherapy is to deliver to the tumor the radiation dose prescribed by the physician, in the most possible accurate form, to save, as much as possible, the healthy tissues located in the neighborhood of the tumor. In order to reach these objectives, it is necessary to carry out a treatment planning and the more the used technologies and therapeutical procedures are sophisticated, the more the planning will be sophisticated. The most sophisticated planning systems use computer programs and are able to determine dose distributions in three dimensions. However, since they work using mathematical models, they may fail and it is necessary to evaluate their performances in order to be considered reliable. Therefore, the availability of a system capable to evaluate the performance of planning systems employed in oncological teletherapy, using ionizing radiation, becomes important. In this work, a data file to be used in radiotherapy planning system quality control (Algorithm accuracy and dose distribution) was developed and it is able to be sent by mail to the radiotherapy services that work with photon beams. (author)

  1. Decommissioning program and future plan for research hot laboratory (2)

    International Nuclear Information System (INIS)

    Koya, Toshio; Nozawa, Yukio; Hanada, Yasushi; Ono, Katsuto; Kanazawa, Hiroyuki; Nihei, Yasuo; Owada, Isao

    2010-01-01

    The Research Hot Laboratory (RHL) in Japan Atomic Energy Agency (JAEA) was constructed in 1961, as the first one in JAPAN, to perform the examinations of irradiated fuels and materials. RHL consists of 10 heavy concrete cells and 38 lead cells, which had been contributed to research and development program in or out of JAEA for the investigation of irradiation behavior for fuels and nuclear materials. However, RHL is the one of target as the rationalization program for decrepit facilities in former Tokai institute. Therefore the decommissioning works of RHL have been started on April 2003. The decommissioning work will be progressing, dismantling the lead cells and decontamination of concrete caves then release in the regulation of controlled area. The 18 lead cells (including semi-hot cell and junior-cell) had been dismantled. Removal of the applause from the cells, survey of the contamination revel in the lead cells and prediction of radio active waste have been finished as the preparing work for dismantling of the remained 20 lead cells. The future plan of decommissioning work has been prepared to incarnate the basic vision and dismantling procedure. (author)

  2. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  3. Natural and accelerated bioremediation research program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  4. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  5. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  6. Developing the strategic plan for pollution prevention in defense programs

    International Nuclear Information System (INIS)

    Marchetti, John A.; Betschart, James F.; Suffern, J. Samuel

    1992-01-01

    In order to provide effective leadership and to ensure a consistent pollution prevention effort in all of its production facilities and laboratories, Defense Programs (DP) Headquarters, in close cooperation with the Field, has developed a strategic plan for its Pollution Prevention Program. The strategic plan is built upon the history of waste minimization, waste reduction, and pollution prevention activity to date, and articulates both long- and short-term strategies to ensure program initiation, growth, and stability. The organization of the program, including Headquarters staffing and linkages to the Geld, is described. Life-cycle analysis of program barriers and bottlenecks, along with associated initiatives and action plans are discussed. (author)

  7. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  8. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  9. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  10. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  11. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  12. Highly enriched uranium (HEU) storage and disposition program plan

    International Nuclear Information System (INIS)

    Arms, W.M.; Everitt, D.A.; O'Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables

  13. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  14. An Administrator's Manual for Planning, Developing, and Implementing Mainstream, Self-Contained, or Co-op Programs for the Disadvantaged.

    Science.gov (United States)

    Pennsylvania State Univ., University Park. Div. of Occupational and Vocational Studies.

    This administrator's manual contains guidelines for planning, developing, and implementing mainstream, self-contained, or cooperative work experience programs for the disadvantaged. Outlined in the introductory section are the philosophy underlying programs for the disadvantaged, procedures to determine student eligibility, signals indicating the…

  15. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  16. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  17. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  18. Experimental program plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  19. Experimental program plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included

  20. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  1. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    Science.gov (United States)

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  2. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  3. Strengthening government health and family planning programs: findings from an action research project in rural Bangladesh.

    Science.gov (United States)

    Simmons, R; Phillips, J F; Rahman, M

    1984-01-01

    An ongoing study at the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) is based on the premise that public sector health and family planning programs can be improved through an assessment of the dysfunctional aspects of their operations, the development of problem-solving capabilities, and the transfer of strategies successfully tested in a small-scale pilot project. This paper reports findings from a field trial implemented in a subunit of the project area at an early stage of the project. Operational barriers to public sector program implementation are discussed with regard to the quantity of work, the quality of work, supplies and facilities, integration of health and family planning, and leadership, supervision, and decision making. Initial results of the ICDDR,B intervention on these managerial processes are also indicated.

  4. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Science.gov (United States)

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor...

  5. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  6. SRS ES ampersand H standards compliance program management plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan

  7. Women’s experiences after Planned Parenthood’s exclusion from a family planning program in Texas☆

    Science.gov (United States)

    Woo, C. Junda; Alamgir, Hasanat; Potter, Joseph E.

    2016-01-01

    Objective We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. Study Design We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006–2010 (NSFG). Results (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Conclusions Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Implications Requiring low-income family planning patients to switch healthcare providers has adverse consequences. PMID:26680757

  8. Systems autonomy technology: Executive summary and program plan

    Science.gov (United States)

    Bull, John S (Editor)

    1987-01-01

    The National Space Strategy approved by the President and Congress in 1984 sets for NASA a major goal of conducting effective and productive space applications and technology programs which contribute materially toward United States leadership and security. To contribute to this goal, OAST supports the Nation's civil and defense space programs and overall economic growth. OAST objectives are to ensure timely provision of new concepts and advanced technologies, to support both the development of NASA missions in space and the space activities of industry and other organizations, to utilize the strengths of universities in conducting the NASA space research and technology program, and to maintain the NASA centers in positions of strength in critical space technology areas. In line with these objectives, NASA has established a new program in space automation and robotics that will result in the development and transfer and automation technology to increase the capabilities, productivity, and safety of NASA space programs including the Space Station, automated space platforms, lunar bases, Mars missions, and other deep space ventures. The NASA/OAST Automation and Robotics program is divided into two parts. Ames Research Center has the lead role in developing and demonstrating System Autonomy capabilities for space systems that need to make their own decisions and do their own planning. The Jet Propulsion Laboratory has the lead role for Telerobotics (that portion of the program that has a strong human operator component in the control loop and some remote handling requirement in space). This program is intended to be a working document for NASA Headquarters, Program Offices, and implementing Project Management.

  9. Applying Planning Algorithms to Argue in Cooperative Work

    Science.gov (United States)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  10. Dose exposure work planning using DMU kinematics tools

    International Nuclear Information System (INIS)

    Rosli Darmawan

    2010-01-01

    The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)

  11. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  12. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan

  13. Hospital graduate social work field work programs: a study in New York City.

    Science.gov (United States)

    Showers, N

    1990-02-01

    Twenty-seven hospital field work programs in New York City were studied. Questionnaires were administered to program coordinators and 238 graduate social work students participating in study programs. High degrees of program structural complexity and variation were found, indicating a state of art well beyond that described in the general field work literature. High rates of student satisfaction with learning, field instructors, programs, and the overall field work experience found suggest that the complexity of study programs may be more effective than traditional field work models. Statistically nonsignificant study findings indicate areas in which hospital social work departments may develop field work programs consistent with shifting organizational needs, without undue risk to educational effectiveness. Statistically significant findings suggest areas in which inflexibility in program design may be more beneficial in the diagnostic related groups era.

  14. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    Energy Technology Data Exchange (ETDEWEB)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  15. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  16. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  17. NASA program planning on nuclear electric propulsion

    International Nuclear Information System (INIS)

    Bennett, G.L.; Miller, T.J.

    1992-03-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors. 28 refs

  18. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  19. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  20. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  1. Planning for a program design for energy environmental analysis. Final report, draft

    Energy Technology Data Exchange (ETDEWEB)

    Denton, J; Saaty, T; Blair, P; Ma, F; Buneman, P

    1976-04-01

    The objective of the work reported here is to assist BER/ERDA in program planning with respect to a regional assessment study program for energy environmental analysis. The focus of the work was to examine the use of operational gaming fof regional assessment studies. Specific concerns were gaming applications (1) in regional assessment or management and direction of regional assessments; (2) for achieving a higher level of public understanding of environmental, health, and safety problems of energy; (3) with respect to the supply of adequately trained manpower for energy; (4) with respect to computational requirements; and (5) with respect to current state-of-the-art in computer simulation. In order to investigate these concerns and examine the feasibility of using operational gaming in a regional assessment study program, a Regional Energy Environment Game (REEG) was designed and implemented on an IBM 370/168 digital computer employing APL (A Programming Language). The applicability of interactive operational gaming has been demonstrated by the REEG as applied to a region consisting of Delaware, Maryland, New Jersey, Pennsylvania, and the District of Columbia.

  2. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  3. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  4. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  5. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  6. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  7. Health and safety work plan for sampling colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Marsh, J.D.; McCarthy, J.F.

    1994-07-01

    This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid sampling project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program manual, and applicable ORNL, Martin Marietta Energy Systems, Inc., and US Department of Energy (DOE) policies and procedures

  8. "BodyWorks": A Parent-Focused Program to Promote Healthful Eating and Physical Activity for Children and Adolescents

    Science.gov (United States)

    Borden, Valerie Melino; Labiner-Wolfe, Judith; Blake, Susan M.; Marr, Amanda; Rowe, Jonelle; Wasserman, Jill

    2012-01-01

    The "BodyWorks" program was designed to help parents improve family eating and activity behaviors. "BodyWorks" was associated with significant gains in parents' knowledge about nutrition and activity, and greater self-efficacy to set family nutrition goals, plan physical activities, and change eating habits. (Contains 1 table.)

  9. Radioactive Waste Management Research Program Plan for high-level waste: 1987

    International Nuclear Information System (INIS)

    1987-05-01

    This plan will identify and resolve technical and scientific issues involved in the NRC's licensing and regulation of disposal systems intended to isolate high level hazardous radioactive wastes (HLW) from the human environment. The plan describes the program goals, discusses the research approach to be used, lays out peer review procedures, discusses the history and development of the high level radioactive waste problem and the research effort to date and describes study objectives and research programs in the areas of materials and engineering, hydrology and geochemistry, and compliance assessment and modeling. The plan also details the cooperative interactions with international waste management research programs. Proposed Earth Science Seismotectonic Research Program plan for radioactive waste facilities is appended

  10. Working plan BDG 91/92

    International Nuclear Information System (INIS)

    1991-09-01

    This report describes the investigative work planned at the potential location Bois de la Glaive, one of four possible locations for a waste disposal site for short-lived low and intermediate-level radioactive waste in Switzerland. This document replaces the 'plan d'execution BDG 89' dated October 1989, which lists the work which Nagra intends to carry out according to the preparatory work in accordance with Article 15 of the Bundesgesetz (Federal Law) regarding compulsory expropriation. This action was unfortunately necessary owing to the intense local opposition to the project. Owing to this opposition it was only possible to carry out field tests for the geophysical work and the plaster capped drill holes at the Bois de la Glaive as well as the hydrological cadastre. Thanks to a recommendation by the local authority and an amicable arrangement with the private owners at most of the observation points, it was possible to start periodic inspection measurements within the framework of the hydrogeological tests from March 1991. The aim of the tests described in this document is to obtain primary geological knowledge, as well as, where applicable, identify possible disqualifying criteria for the potential location at Bois de la Glaive. The different geological and hydrogeological tests are presented following an introduction which refers to the geological, historical and legal problems. It is intended to carry out these tests in 1991/92 possibly extending over into the first quarter 1993. Thus the necessary level of information should be achieved for this location. (author) figs., tabs., 14 refs

  11. NWMO transportation technical work program

    International Nuclear Information System (INIS)

    Hatton, C.

    2015-01-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  12. NWMO transportation technical work program

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, C. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2015-07-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  13. 40 CFR 30.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...

  14. 45 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  15. Tank Waste Remediation System Inactive Miscellaneous Underground Storage Tanks Program Plan

    International Nuclear Information System (INIS)

    Gustavson, R.D.

    1995-12-01

    The Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure

  16. Draft program plan for TNS: The Next Step after the Tokamak Fusion Test Reactor. Part IV. Program planning

    International Nuclear Information System (INIS)

    Wood, W.B.

    1977-02-01

    In this fourth part of the four-part TNS Draft Program Plan, project engineering concerns are considered. The TNS Project is first broken down into the major time and functional periods of feasibility study, preconceptual design, conceptual design, and line item construction, while the elements of the project are organized into an administrative work breakdown structure. With the aid of these two classifying schemes, the project tasks are described in terms of schedule, estimated cost, type of funding, and proposed type of participant. The initial constraints of completion data, anticipated scientific inputs, and budget procedures are used to develop a two-phase project in which the facilities are authorized first and the device 2 years later. This specific mechanism is fundamental to the construction of the schedule and should be reconsidered when the completion and initiation dates are reformulated

  17. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  18. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  19. 38 CFR 49.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  20. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  1. Soil Vapor Extraction and Bioventing Test Work Plan for the MOGAS Site, Myrtle Beach Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1995-01-01

    This work plan presents an evaluation of soil vapor extraction (SVE) and bioventing, and describes the SVE pilot scale and bioventing activities to be conducted to extract and treat soil gas at Installation Restoration Program (IRP...

  2. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    Energy Technology Data Exchange (ETDEWEB)

    Young, Ralph [Paducah Citizens Advisory Board (United States)

    2013-07-01

    -specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

  3. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  4. Master plan nurse duty roster using the 0-1 goal programming technique

    Science.gov (United States)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  5. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  6. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    International Nuclear Information System (INIS)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ''scores'' and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process

  7. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  8. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-05-01

    This paper presents the status of technology program planning to develop those Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies with significant development heritage: ion electric propulsion and the SP-100 space nuclear power technologies. Detailed plans are presented for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  9. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  10. 22 CFR 145.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...

  11. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  12. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  13. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  14. Characterization program management plan for Hanford K Basin Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    Lawrence, L.A.

    1995-01-01

    A management plan was developed for Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratories (PNL) to work together on a program to provide characterization data to support removal, conditioning and subsequent dry storage of the spent nuclear fuels stored at the Hanford K Basins. The Program initially supports gathering data to establish the current state of the fuel in the two basins. Data Collected during this initial effort will apply to all SNF Project objectives. N Reactor fuel has been degrading with extended storage resulting in release of material to the basin water in K East and to the closed conisters in K West. Characterization of the condition of these materials and their responses to various conditioning processes and dry storage environments are necessary to support disposition decisions. Characterization will utilize the expertise and capabilities of WHC and PNL organizations to support the Spent Nuclear Fuels Project goals and objectives. This Management Plan defines the structure and establishes the roles for the participants providing the framework for WHC and PNL to support the Spent Nuclear Fuels Project at Hanford

  15. Westinghouse Hanford Company waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Craig, P.A.; Nichols, D.H.; Lindsey, D.W.

    1991-08-01

    The purpose of this plan is to establish the Westinghouse Hanford Company's Waste Minimization Program. The plan specifies activities and methods that will be employed to reduce the quantity and toxicity of waste generated at Westinghouse Hanford Company (Westinghouse Hanford). It is designed to satisfy the US Department of Energy (DOE) and other legal requirements that are discussed in Subsection C of the section. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as permitted by DOE Order 5400.1 (DOE 1988a). This plan is based on the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, which directs DOE Field Office, Richland contractors to develop and maintain a waste minimization program. This waste minimization program is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Westinghouse Hanford Waste Minimization Program is designed to prevent or minimize pollutant releases to all environmental media from all aspects of Westinghouse Hanford operations and offers increased protection of public health and the environment. 14 refs., 2 figs., 1 tab

  16. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  17. Fusion reactor materials program plan. Section III. Plasma material interaction

    International Nuclear Information System (INIS)

    1978-07-01

    A discussion of materials-related problems and an analysis of such problems is given for each major topical area. The strategy that will be used to solve the materials problems is described. As part of this program strategy, a series of major milestones is identified that extends over the next 20 years. Detailed task descriptions for the next five years leading to the achievement of the major milestones are given. Each task is described on a separate page (or task sheet) which includes the task number, task title, objective, scope, and the major milestones addressed by the task. Secondary milestones within a given task or subtask are defined, together with a priority assignment and an estimate of man-years to accomplish the work. Each Plan is organized along major topics which parallel the Subtask organization of the Task Group responsible for the Plan

  18. Environmental Development Plan (EDP): magnetohydrodynamics program, FY 1977

    International Nuclear Information System (INIS)

    1978-03-01

    This magnetohydrodynamics (MHD) EDP identifies and examines the environmental, health, and safety issues concerning the development of the ERDA Magnetohydrodynamics Program, the environmental activities needed to resolve these issues, applicable ongoing and completed research, and a time-phased action plan for the evaluation and mitigation of environmental impacts. A schedule for environmental research, assessment, and other activities is laid out. The purpose of the EDP is to identify environmental issues and to specify actions to ensure the environmental acceptability of commercial energy technologies being developed by ERDA. The EDP also will assist in coordinating ERDA's environmental activities with those of other government agencies. This document addresses the following technologies associated with ERDA's MHD program: (1) open-cycle magnetohydrodynamics; (2) closed-cycle plasma magnetohydrodynamics; and (3) closed-cycle liquid metal magnetohydrodynamics. The proposed environmental action plan is designed to meet the following objectives: (1) develop methods for monitoring and measuring emissions; (2) characterize air emissions, water effluents, and solid wastes from MHD; (3) determine potential environmental impacts and health hazards associated with MHD; (4) model pollutant transport and transformation; (5) ensure adequate control of pollutant emissions; (6) identify and minimize occupational health and safety hazards; (7) prepare NEPA compliance documents; and (8) assess the environmental, health, and safety impacts of the commercialized industry. This EDP will be updated and revised annually to take into account the progress of technologies toward commercialization, the environmental work accomplished, and the resolution of outstanding environmental issues concerning the technologies

  19. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  20. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  1. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  2. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  3. Next Generation Nuclear Plant Materials Research and Development Program Plan, Revision 3

    International Nuclear Information System (INIS)

    G.O. Hayner; R.L. Bratton; R.E. Mizia; W.E. Windes; W.R. Corwin; T.D. Burchell; C.E. Duty; Y. Katoh; J.W. Klett; T.E. McGreevy; R.K. Nanstad; W. Ren; P.L. Rittenhouse; L.L. Snead; R.W. Swindeman; D.F. Wlson

    2006-01-01

    Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R and D) Program is responsible for performing R and D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R and D Program includes the following elements: Developing a specific approach, program plan and other project management tools for managing the R and D program elements; Developing a specific work package for the R and D activities to be performed during each government fiscal year; Reporting the status and progress of the work based on committed deliverables and milestones; Developing collaboration in areas of materials R and D of benefit to the NGNP with countries that are a part of the Generation IV International Forum; and Ensuring that the R and D work performed in support of the materials program supports the PPMP and is in conformance with established Quality Assurance and procurement requirements

  4. A Seven-Step Business Plan Methodology To Develop and Manage Certificate Programs.

    Science.gov (United States)

    Cherif, Karim

    2000-01-01

    Outlines a process for writing a business plan for university certificate programs. The plan's sections include executive summary, rationale and objectives, prospective student profile, external involvement, program characteristics, marketing and promotion, and program administration. (SK)

  5. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  6. Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program

    International Nuclear Information System (INIS)

    None

    2000-01-01

    This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects

  7. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-01-01

    This paper presents the status of technology program planning to achieve readiness of Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies of significant maturity: ion electric propulsion and the SP-100 space nulcear power technologies. Detailed plans are presented herein for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  8. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  9. Generation Expansion Planning with Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    DEFF Research Database (Denmark)

    Zhan, Yiduo; Zheng, Qipeng; Wang, Jianhui

    2016-01-01

    , the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming......Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined...

  10. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    Nacht, S. J.

    2000-01-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  11. The use of mixed-integer programming for inverse treatment planning with pre-defined field segments

    International Nuclear Information System (INIS)

    Bednarz, Greg; Michalski, Darek; Houser, Chris; Huq, M. Saiful; Xiao Ying; Rani, Pramila Anne; Galvin, James M.

    2002-01-01

    Complex intensity patterns generated by traditional beamlet-based inverse treatment plans are often very difficult to deliver. In the approach presented in this work the intensity maps are controlled by pre-defining field segments to be used for dose optimization. A set of simple rules was used to define a pool of allowable delivery segments and the mixed-integer programming (MIP) method was used to optimize segment weights. The optimization problem was formulated by combining real variables describing segment weights with a set of binary variables, used to enumerate voxels in targets and critical structures. The MIP method was compared to the previously used Cimmino projection algorithm. The field segmentation approach was compared to an inverse planning system with a traditional beamlet-based beam intensity optimization. In four complex cases of oropharyngeal cancer the segmental inverse planning produced treatment plans, which competed with traditional beamlet-based IMRT plans. The mixed-integer programming provided mechanism for imposition of dose-volume constraints and allowed for identification of the optimal solution for feasible problems. Additional advantages of the segmental technique presented here are: simplified dosimetry, quality assurance and treatment delivery. (author)

  12. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  13. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  14. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  15. The Situation Analysis Study of the family planning program in Kenya.

    Science.gov (United States)

    Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A

    1991-01-01

    A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.

  16. Program plan, and request for reprogramming first year funds. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  17. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  18. Plans for the NKS-program 1998-2001; Planer for NKS-programmet 1998-2001

    Energy Technology Data Exchange (ETDEWEB)

    Bennerstedt, T [ed.

    1999-08-01

    The present report is a comprehensive compilation of the adopted NKS project plans for the sixth four-year period, 1998-2001. Most of the plans are in English. One is in both English and Danish. One is in Norwegian, with a brief summary in English. Only two of the six appendices are in English. In spite of this, it is believed that the report will serve as a valuable source of information not only to those actually active in or closely following the NKS work, but also the international scientific community, e.g., within EU and in the Baltic States. The research program incorporates reactor safety, radioactive waste, emergency preparedness, radioecology, cross-disciplinary studies, and information issues. The necessary administrative support program, including the NKS Secretariat, is not described herein. Neither is the aim, scope or organization of NKS, since this has been covered elsewhere. (EHS)

  19. Radiological Work Planning and Procedures

    International Nuclear Information System (INIS)

    KURTZ, J.E.

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD

  20. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  1. A Fuzzy Linear Programming Approach for Aggregate Production Planning

    DEFF Research Database (Denmark)

    Iris, Cagatay; Cevikcan, Emre

    2014-01-01

    a mathematical programming framework for aggregate production planning problem under imprecise data environment. After providing background information about APP problem, together with fuzzy linear programming, the fuzzy linear programming model of APP is solved on an illustrative example for different a...

  2. FY1983 HTGR summary level program plan

    International Nuclear Information System (INIS)

    1983-01-01

    The major focus and priority of the FY1983 HTGR Program is the development of the HTGR-SC/C Lead Project through one of the candidate lead utilities. Accordingly, high priority will be given to work described in WBS 04 for site and user specific studies toward the development of the Lead Project. Asessment of advanced HTGR systems will continue during FY1983 in accordance with the High Temperature Process Heat (HTPH) Concept Evaluation Plan. Within the context of that plan, the assessment of the monolithic HTPH concepts has been essentially completed in FY1982 and FY1983 activities and will be limited to documentation only. the major advanced HTGR systems efforts in FY1983 will be focused on the further definition of the Modular Reactor Systems concepts in both the reforming (MRS-R) and Steam Cycle/Cogeneration 9MRS-SC/C) configurations in WBS 41. The effort will concentrate upon key technical issues and trade studies oriented to reduction in expected cost and schedule duration. With regard to the latter, the most significant will be trade study addressing the degree of modularization of reactor plant structures. particular attention will be given to the confinement building which currently defines the critical path for construction

  3. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  4. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    International Nuclear Information System (INIS)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required

  5. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  6. 28 CFR 545.23 - Inmate work/program assignment.

    Science.gov (United States)

    2010-07-01

    ... community living area, unless the pretrial inmate has signed a waiver of his or her right not to work (see... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Inmate work/program assignment. 545.23... WORK AND COMPENSATION Inmate Work and Performance Pay Program § 545.23 Inmate work/program assignment...

  7. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  8. Navy Radon Assessment and Mitigation Program: Work/quality assurance project plan screening phase

    International Nuclear Information System (INIS)

    1991-03-01

    In 1987, the military services of the United States were tasked to take appropriate action to establish an indoor radon assessment and mitigation program. As a result, the Naval Facilities Engineering Command (NAVFACENGCOM) was assigned the responsibility of identifying potential hazards to personnel from exposure to naturally occurring radon gas and prioritizing corrective actions and to coordinating these actions with the major claimants. NAVRAMP is based upon current US Environmental Protection Agency (EPA) guidelines. The program has been separated into four phases. The screening phase will concentrate on evaluating radon levels, based on statistical samples, in those buildings that have been determined to be at most at risk to elevated levels of radon, such as base housing, schools, day-care centers, hospitals, brigs, Base Officer Quarters, and Base Enlisted Quarters. During the assessment phase, every building that contains personnel for over 4 h/day will be evaluated. Mitigation work will be accomplished by Navy or Navy-contracted personnel. HAZWRAP services during the mitigation phase will consist of determining the extent of reduction in radon levels after the mitigation effort. 7 refs., 11 figs

  9. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  10. Are men well served by family planning programs?

    Science.gov (United States)

    Hardee, Karen; Croce-Galis, Melanie; Gay, Jill

    2017-01-23

    Although the range of contraceptives includes methods for men, namely condoms, vasectomy and withdrawal that men use directly, and the Standard Days Method (SDM) that requires their participation, family planning programming has primarily focused on women. What is known about reaching men as contraceptive users? This paper draws from a review of 47 interventions that reached men and proposes 10 key considerations for strengthening programming for men as contraceptive users. A review of programming shows that men and boys are not particularly well served by programs. Most programs operate from the perspective that women are contraceptive users and that men should support their partners, with insufficient attention to reaching men as contraceptive users in their own right. The notion that family planning is women's business only is outdated. There is sufficient evidence demonstrating men's desire for information and services, as well as men's positive response to existing programming to warrant further programming for men as FP users. The key considerations focus on getting information and services where men and boys need it; addressing gender norms that affect men's attitudes and use while respecting women's autonomy; reaching adolescent boys; including men as users in policies and guidelines; scaling up successful programming; filling gaps with implementation research and monitoring & evaluation; and creating more contraceptive options for men.

  11. The Philippine Population Program strategic plan (1981-1985).

    Science.gov (United States)

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.

  12. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    Science.gov (United States)

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  13. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    Science.gov (United States)

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  14. Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, C.A.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) is organized to address WHC's implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE

  15. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  16. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  17. A methodology for comprehensive strategic planning and program prioritization

    Science.gov (United States)

    Raczynski, Christopher Michael

    2008-10-01

    This process developed in this work, Strategy Optimization for the Allocation of Resources (SOAR), is a strategic planning methodology based off Integrated Product and Process Development and systems engineering techniques. Utilizing a top down approach, the process starts with the creation of the organization vision and its measures of effectiveness. These measures are prioritized based on their application to external world scenarios which will frame the future. The programs which will be used to accomplish this vision are identified by decomposing the problem. Information is gathered on the programs as to the application, cost, schedule, risk, and other pertinent information. The relationships between the levels of the hierarchy are mapped utilizing subject matter experts. These connections are then utilized to determine the overall benefit of the programs to the vision of the organization. Through a Multi-Objective Genetic Algorithm a tradespace of potential program portfolios can be created amongst which the decision maker can allocate resources. The information and portfolios are presented to the decision maker through the use of a Decision Support System which collects and visualizes all the data in a single location. This methodology was tested utilizing a science and technology planning exercise conducted by the United States Navy. A thorough decomposition was defined and technology programs identified which had the potential to provide benefit to the vision. The prioritization of the top level capabilities was performed through the use of a rank ordering scheme and a previous naval application was used to demonstrate a cumulative voting scheme. Voting was performed utilizing the Nominal Group Technique to capture the relationships between the levels of the hierarchy. Interrelationships between the technologies were identified and a MOGA was utilized to optimize portfolios with respect to these constraints and information was placed in a DSS. This

  18. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  19. Writing parallel programs that work

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    Serial algorithms typically run inefficiently on parallel machines. This may sound like an obvious statement, but it is the root cause of why parallel programming is considered to be difficult. The current state of the computer industry is still that almost all programs in existence are serial. This talk will describe the techniques used in the Intel Parallel Studio to provide a developer with the tools necessary to understand the behaviors and limitations of the existing serial programs. Once the limitations are known the developer can refactor the algorithms and reanalyze the resulting programs with the tools in the Intel Parallel Studio to create parallel programs that work. About the speaker Paul Petersen is a Sr. Principal Engineer in the Software and Solutions Group (SSG) at Intel. He received a Ph.D. degree in Computer Science from the University of Illinois in 1993. After UIUC, he was employed at Kuck and Associates, Inc. (KAI) working on auto-parallelizing compiler (KAP), and was involved in th...

  20. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program plan: Executive summary

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan provides a strategy for management of hazardous and mixed wastes generated by the five Department of Energy (DOE) installations managed by Martin Marietta Energy Systems, Inc. (Energy Systems). This integrated corporate plan is based on the individual installation plans, which identify waste streams, facility capabilities, problem wastes, future needs, and funding needs. Using this information, the corporate plan identifies common concerns and technology/facility needs over the next 10 years. The overall objective of this corporate plan is to ensure that treatment, storage, and disposal (TSD) needs for all hazardous and mixed wastes generated by Energy Systems installations have been identified and planned for. Specific objectives of the program plan are to (1) identify all hazardous and mixed waste streams; (2) identify hazardous and mixed waste TSD requirements; (3) identify any unresolved technical issues preventing implementation of the strategy; (4) develop schedules for studies, demonstrations, and facilities to resolve the issues; and (5) define the interfaces with the Low-Level Waste Disposal Development and Demonstration (LLWDDD) Program. 10 refs., 7 figs

  1. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  2. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  3. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  4. A comprehensive medical student career development program improves medical student satisfaction with career planning.

    Science.gov (United States)

    Zink, Brian J; Hammoud, Maya M; Middleton, Eric; Moroney, Donney; Schigelone, Amy

    2007-01-01

    In 1999, the University of Michigan Medical School (UMMS) initiated a new career development program (CDP). The CDP incorporates the 4-phase career development model described by the Association of American Medical Colleges (AAMC) Careers in Medicine (CiM). The CDP offers self-assessment exercises with guidance from trained counselors for 1st- and 2nd-year medical students. Career exploration experiences include Career Seminar Series luncheons, shadow experiences with faculty, and a shadow program with second-year (M2) and fourth-year (M4) medical students. During the decision-making phase, students work with trained faculty career advisors (FCA). Mandatory sessions are held on career selection, preparing the residency application, interviewing, and program evaluation. During the implementation phase, students meet with deans or counselors to discuss residency application and matching. An "at-risk plan" assists students who may have difficulty matching. The CiM Web site is extensively used during the 4 stages. Data from the AAMC and UMMS Graduation Questionnaires (GQ) show significant improvements for UMMS students in overall satisfaction with career planning services and with faculty mentoring, career assessment activities, career information, and personnel availability. By 2003, UMMS students had significantly higher satisfaction in all measured areas of career planning services when compared with all other U.S. medical students.

  5. Appendix B, AVLIS Program: Statement of work May 1, 1994 through July 31, 1994

    International Nuclear Information System (INIS)

    1994-04-01

    While the United States Enrichment Corporation (USEC) is preparing decisions regarding it's future Atomic Vapor Laser Isotope Separation (AVLIS) deployment options, this interim three month plan (through July 31, 1994) is intended to maintain the USEC options for the ultimate deployment of AVLIS technology for enriching uranium, gadolinium (Gd) and possibly erbium (Er). This plan addresses the key activities leading to such commercial deployment while recognizing current, significant funding limitations. The goal of this three month plan is to provide support to the USEC business assessment; assure that facilities, equipment and other property remain functional and retain value; and achieve maximum progress on critical tasks required for future AVLIS deployment if the USEC decides to proceed. This proposed plan continues activities (through July 31, 1994) that could lead to an overall plan for deployment of a uranium and a Gd/Er enrichment facility. This Statement of Work (SOW) is directed toward preserving the technical capabilities and core staff of the AVLIS Program while minimizing program costs and maintaining options for the USEC pending a decision on the future course of direction for the AVLIS Program. The specific activities described in this SOW are: (1) maintenance and surveillance of those AVLIS facilities not required for near-term operations; (2) preparation for future photoionization; (3) long lead preparation for future operations; (4) provide support, as requested by the USEC, for development of strategies and market entry plans for enriched uranium, gadolinium, and possibly erbium; (5) provide support, as requested, for the USEC Advanced Technology Business Evaluation; and (6) continue uranium processing and fuel cycle integration activities

  6. Hanford Site waste tank farm facilities design reconstitution program plan

    International Nuclear Information System (INIS)

    Vollert, F.R.

    1994-01-01

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980's has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan

  7. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  8. A Guide for Planning and Implementing Successful Mental Health Educational Programs.

    Science.gov (United States)

    Blanco-Vieira, Thiago; Ramos, Fernando Augusto da Cunha; Lauridsen-Ribeiro, Edith; Ribeiro, Marcos Vinícius Vieira; Meireles, Elisa Andrade; Nóbrega, Brunno Araújo; Motta Palma, Sonia Maria; Ratto, Maria de Fátima; Caetano, Sheila Cavalcante; Ribeiro, Wagner Silva; Rosário, Maria Conceição do

    2018-01-01

    Considering the global burden of mental disorders, there is a worldwide need to improve the quality of mental health care. In order to address this issue, a change in how health care professionals are trained may be essential. However, the majority of the few reports published on this field's training programs do not discuss the characteristics associated with the success or failure of these strategies. The purpose of this review was to systematically examine the literature about mental health training programs designed for health care professionals in order to identify the relevant factors associated with their effective implementation. The MEDLINE/PubMed, SciELO, and Virtual Health Library databases were used to search for articles published before February 2017 and reviewed by two double-blind reviewers. We found 77 original papers about mental health educational programs. Many of these studies were conducted in the USA (39%), addressed depression as the main subject (34%), and applied a quasi-experimental design (52%). Effective interventions were associated with the following characteristics: the use of learner-centered and interactive methodological approaches; a curriculum based on challenges in the trainees' daily routines; the involvement of experts in the program's development; the enrollment of experienced participants; interdisciplinary group work; flexible timing; the use of e-learning resources; and optimizing the implementation of knowledge into the participants' routine work practices. These results will be helpful for planning and improving the quality of future educational programs in mental health.

  9. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  10. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  11. Monitored retrievable storage program. Status and plans for meeting NWPA requirements

    International Nuclear Information System (INIS)

    Hall, R.J.; Fletcher, J.F.

    1983-12-01

    Accomplishments of the Monitored Retrieval Storage (MRS) Program since passage of the Nuclear Waste Policy Act of 1982 (NWPA) are as follows: (1) R and D needs report was submitted; (2) conceptual design analysis of 8 MRS concepts was performed; (3) selection of two MRS concepts (primary, alternative) are underway; (4) Parson/Westinghouse/Golder were selected as architect-engineer; (5) functional design criteria were established; (6) reports to accompany proposal were defined; and (7) evaluations of mission, cost-effectiveness, deployment time were performed. Future work, plans and schedule include completion of facility advanced conceptual design and accompanying design reports in early 1985, for submittal with proposal in June. Designs are being prepared for the primary concept, and in less detail, for the alternate. Three separate site locations will be assumed for each concept. A siting plan, to accompany the proposal, will also be completed in early 1985, as will an environmental assessment now under preparation. It is planned that the proposal be accompanied by several reports augmenting the planning base for post-proposal actions, to be activated at the time MRS deployment is authorized by Congress. 9 figures

  12. Nuclear weapons modernization: Plans, programs, and issues for Congress

    Science.gov (United States)

    Woolf, Amy F.

    2017-11-01

    The United States is currently recapitalizing each delivery system in its "nuclear triad" and refurbishing many of the warheads carried by those systems. The plans for these modernization programs have raised a number of questions, both within Congress and among analysts in the nuclear weapons and arms control communities, about the costs associated with the programs and the need to recapitalize each leg of the triad at the same time. This paper covers four distinct issues. It begins with a brief review of the planned modernization programs, then addresses questions about why the United States is pursuing all of these modernization programs at this time. It then reviews the debate about how much these modernization programs are likely to cost in the next decade and considers possible changes that might reduce the cost. It concludes with some comments about congressional views on the modernization programs and prospects for continuing congressional support in the coming years.

  13. Water Conservation and Reuse. Instructor Guide. Working for Clean Water: An Information Program for Advisory Committees.

    Science.gov (United States)

    Pennsylvania State Univ., Middletown. Inst. of State and Regional Affairs.

    Described is a learning session on water conservation intended for citizen advisory groups interested in water quality planning. Topics addressed in this instructor's manual include water conservation needs, benefits, programs, technology, and problems. These materials are components of the Working for Clean Water Project. (Author/WB)

  14. DO FAMILY PLANNING PROGRAMS DECREASE POVERTY? EVIDENCE FROM PUBLIC CENSUS DATA

    Science.gov (United States)

    Bailey, Martha J.; Malkova, Olga; Norling, Johannes

    2014-01-01

    This paper provides new evidence that family planning programs are associated with a decrease in the share of children and adults living in poverty. Our research design exploits the county roll-out of U.S. family planning programs in the late 1960s and early 1970s and examines their relationship with poverty rates in the short and longer-term in public census data. We find that cohorts born after federal family planning programs began were less likely to live in poverty in childhood and that these same cohorts were less likely to live in poverty as adults. PMID:25346655

  15. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  16. Linear Programming for Vocational Education Planning. Interim Report.

    Science.gov (United States)

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  17. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  18. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  19. Health plans' disease management programs: extending across the medical and behavioral health spectrum?

    Science.gov (United States)

    Merrick, Elizabeth Levy; Horgan, Constance M; Garnick, Deborah W; Hodgkin, Dominic; Morley, Melissa

    2008-01-01

    Although the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health and depression program characteristics are highly variable.

  20. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  1. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  2. A neo-strategic planning approach to enhance local tobacco control programs.

    Science.gov (United States)

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality

  3. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams.

  4. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    International Nuclear Information System (INIS)

    1994-09-01

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams

  5. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  6. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    Science.gov (United States)

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  7. Quality Assurance Program Plan for the Waste Isolation Pilot Plant Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-01-01

    This Quality Assurance Program Plan (QAPP) identifies the quality of data necessary to meet the specific objectives associated with the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Experimental-Waste Characterization Program (the Program). DOE plans to conduct experiments in the WIPP during a Test Phase of approximately 5 years. These experiments will be conducted to reduce the uncertainties associated with the prediction of several processes (e.g., gas generation) that may influence repository performance. The results of the experiments will be used to assess the ability of the WIPP to meet regulatory requirements for the long-term protection of human health and the environment from the disposal of TRU wastes. 37 refs., 25 figs., 18 tabs

  8. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  9. Proposing an Aggregate Production Planning Model by Goal Programming Approach, a Case Study

    Directory of Open Access Journals (Sweden)

    Mansoureh Farzam Rad

    2014-06-01

    Full Text Available Production planning is one of the most important functions in the process of production management. Production planning in the intermediate range of time is termed as aggregate production planning (APP. Aggregate production planning is an important upper level planning activity in a production management system. The present study tries to suggest an aggregate production planning model for products of Hafez tile factory during one year. Due to this fact that the director of the company seeks 3 main objectives to determine the optimal production rate, the linear goal planning method was employed. After solving the problem, in order to examine the efficiency and the distinctiveness of this method in compare to linear programming, the problem was modeled just by considering one objective then was solved by linear programming approach. The findings revealed the goal programming with multi objectives resulted more appropriate solution rather than linear programming with just one objective.

  10. Strategic plan and strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below

  11. AUA Program Master Plan. Volume 1: Overview

    Science.gov (United States)

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  12. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The objective of the Hazardous Waste Development, Demonstration and Disposal (HAZWDDD) Program Plan is to ensure that the needs for treatment and disposal of all its hazardous and mixed wastes have been identified and planned for. A multifaceted approach to developing and implementing this plan is given, including complete plans for each of the five installations, and an overall integrated plan is also described in this report. The HAZWDDD Plan accomplishes the following: (1) provides background and organizational information; (2) summarizes the 402 hazardous and mixed waste streams from the five installations by grouping them into 13 general waste categories; (3) presents current treatment, storage, and disposal capabilities within Energy Systems; (4) develops a management strategy by outlining critical issues, presents flow sheets describing management schemes for problem waste streams, and builds on the needs identified; (5) outlines specific activities needed to implement the strategy developed; and (6) presents schedule and budget requirements for the next decade. The HAZWDDD Program addresses current and future technical problems and regulatory issues and uncertainties. Because of the nature and magnitude of the problems in hazardous and mixed waste management, substantial funding will be required. 10 refs., 39 figs., 16 tabs

  13. Timber management planning with timber ram and goal programming

    Science.gov (United States)

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  14. Polymorphic Uncertain Linear Programming for Generalized Production Planning Problems

    Directory of Open Access Journals (Sweden)

    Xinbo Zhang

    2014-01-01

    Full Text Available A polymorphic uncertain linear programming (PULP model is constructed to formulate a class of generalized production planning problems. In accordance with the practical environment, some factors such as the consumption of raw material, the limitation of resource and the demand of product are incorporated into the model as parameters of interval and fuzzy subsets, respectively. Based on the theory of fuzzy interval program and the modified possibility degree for the order of interval numbers, a deterministic equivalent formulation for this model is derived such that a robust solution for the uncertain optimization problem is obtained. Case study indicates that the constructed model and the proposed solution are useful to search for an optimal production plan for the polymorphic uncertain generalized production planning problems.

  15. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  16. Atmospheric chemistry: Description of the area of performance and a working plan

    Science.gov (United States)

    Kirchhoff, Volker W. J. H.

    1986-11-01

    INPE's program in Atmospheric Chemistry Research is described. Research in this area is concerned with atmospheric gases and their chemical reactions, production and loss rates, and their interactions with the biosphere. Atmospheric chemistry includes concepts in Physics, Chemistry, Meteorology, and Biology, which gives it a strong interdisciplinary character. The interaction of some of the atmospheric gases with the biosphere, such as ozone, is very strong and direct. Studying atmospheric chemistry is, therefore, of direct interest to man and the quality of life. Details are described to define the objectives of study, in particular those of our research program at INPE. A working plan is proposed in order to reach the defined goals. Owing to the large anthropogenic interference in the balance of the natural atmosphere it is anticipated that a better understanding of Atmospheric Chemistry will be the great scientific challenge of the next decade.

  17. Individualism-Collectivism: Links to Occupational Plans and Work Values

    Science.gov (United States)

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  18. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  19. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  20. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  1. Planning for College Success

    Science.gov (United States)

    PEPNet, 2009

    2009-01-01

    "Planning for College Success" (PCS) is a curriculum model designed by Sharon Downs, M.S., for a course intended to assist deaf and hard of hearing students during their initial introduction to college life. This program allows students to work one-on-one with a counselor to plan for their college success. The program includes short-term goals and…

  2. Half-liter supernatant sampler system engineering work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task

  3. NRC Seismic Design Margins Program Plan

    International Nuclear Information System (INIS)

    Cummings, G.E.; Johnson, J.J.; Budnitz, R.J.

    1985-08-01

    Recent studies estimate that seismically induced core melt comes mainly from earthquakes in the peak ground acceleration range from 2 to 4 times the safe shutdown earthquake (SSE) acceleration used in plant design. However, from the licensing perspective of the US Nuclear Regulatory Commission, there is a continuing need for consideration of the inherent quantitative seismic margins because of, among other things, the changing perceptions of the seismic hazard. This paper discusses a Seismic Design Margins Program Plan, developed under the auspices of the US NRC, that provides the technical basis for assessing the significance of design margins in terms of overall plant safety. The Plan will also identify potential weaknesses that might have to be addressed, and will recommend technical methods for assessing margins at existing plants. For the purposes of this program, a general definition of seismic design margin is expressed in terms of how much larger that the design basis earthquake an earthquake must be to compromise plant safety. In this context, margin needs to be determined at the plant, system/function, structure, and component levels. 14 refs., 1 fig

  4. Training Accreditation Program

    International Nuclear Information System (INIS)

    1989-01-01

    The Training Accreditation Program establishes the objectives and criteria against which DOE nuclear facility training is evaluated to determine its readiness for accreditation. Training programs are evaluated against the accreditation objectives and criteria by facility personnel during the initial self-evaluation process. From this self-evaluation, action plans are made by the contractor to address the scope of work necessary in order to upgrade any deficiencies noted. This scope of work must be formally documented in the Training Program Accreditation Plan. When reviewed and approved by the responsible Head of the Field Organization and cognizant Program Secretarial Office, EH-1 concurrence is obtained. This plan then becomes the document which guides accreditation efforts for the contractor

  5. Development and Implementation of a Mental Health Work Rehabilitation Program: Results of a Developmental Evaluation.

    Science.gov (United States)

    Sylvain, Chantal; Durand, Marie-José; Velasquez Sanchez, Astrid; Lessard, Nathalie; Maillette, Pascale

    2018-05-23

    Purpose Long-term work disability due to common mental disorders (CMDs) is a growing problem. Yet optimal interventions remain unclear and little is known about implementation challenges in everyday practice. This study aimed to support and evaluate, in real time, the development and implementation of a work rehabilitation program (WRP) designed to promote post-CMD return-to-work (RTW). Methods A 2-year developmental evaluation was performed using a participatory approach. At program outset, the researchers held five work meetings to revise the program's logic model and discuss its underlying change theory with clinicians. Data collection tools used throughout the study period were structured charts of activities conducted with workers (n = 41); in-depth interviews with program clinicians and managers (n = 9); and participant observation during work meetings. Quantitative data were analyzed using descriptive statistics. Qualitative data underwent thematic analysis using a processual approach. Results Three types of activity were developed and implemented: individual and group interventions targeting workers, and joint activities targeting partners (physicians, employers, others). While worker-targeted activities were generally implemented as planned, joint activities were sporadic. Analysis of the implementation process revealed five challenges faced by clinicians. Determinants included clinicians, host organization, sociopolitical context and resources provided by the evaluation. Conclusion The program studied is original in that it is based on the best available scientific knowledge, yet adapted to contextual particularities. The identified implementation challenges highlight the need for greater importance to be placed on the external, non-program context to ensure sustainable implementation in everyday practice.

  6. Next Generation Nuclear Plant Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    P. E. MacDonald

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen

  7. Next Generation Nuclear Plant Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented

  8. Optimal Diet Planning for Eczema Patient Using Integer Programming

    Science.gov (United States)

    Zhen Sheng, Low; Sufahani, Suliadi

    2018-04-01

    Human diet planning is conducted by choosing appropriate food items that fulfill the nutritional requirements into the diet formulation. This paper discusses the application of integer programming to build the mathematical model of diet planning for eczema patients. The model developed is used to solve the diet problem of eczema patients from young age group. The integer programming is a scientific approach to select suitable food items, which seeks to minimize the costs, under conditions of meeting desired nutrient quantities, avoiding food allergens and getting certain foods into the diet that brings relief to the eczema conditions. This paper illustrates that the integer programming approach able to produce the optimal and feasible solution to deal with the diet problem of eczema patient.

  9. Multiyear Program Plan for the High Temperature Materials Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  10. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  11. Orchestration in work environment policy programs

    DEFF Research Database (Denmark)

    Hasle, Peter; Limborg, Hans Jørgen; Grøn, Sisse

    2017-01-01

    In spite of many years’ efforts, it is difficult to prove substantial improvements of the work environment and policymakers are continuously searching for new efficient strategies. This paper examines the concept of orchestration of work environment programs, based on an empirical analysis...... of recent Danish policy. Orchestration is a strategy where different stakeholders and activities are integrated into a unified program aimed at a specific target group. The analysis includes three policy cases, supplemented with two company case studies. The research shows a move toward a more governance...... type of regulation, which is not only emerging in network but also includes more explicitly orchestrated policy programs. The stakeholders participate in the network with different interests and the orchestration of work environment policies is therefore built on a platform of regulation...

  12. Verification and Planning Based on Coinductive Logic Programming

    Science.gov (United States)

    Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal

    2008-01-01

    Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution

  13. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  14. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  15. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  16. Pollution prevention program plan 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE's commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE's routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations

  17. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    Science.gov (United States)

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  18. The US Global Change Data and Information Management Program Plan

    International Nuclear Information System (INIS)

    1992-01-01

    The US Global Change Research Program (USGCRP) requires massive quantities of highly diverse data and information to improve our understanding of global change processes. The Committee on Earth and Environmental Sciences (CEES) comprises Federal agencies that need to provide reliable data and information for this purpose from existing programs and archives and from new activities designed to improve upon the data and information. This US Global Change Data and Information Management Program Plan commits the participating Federal agencies to work with each other, with academia, and with the international community to make it as easy as possible for researchers and others to access and use global change data and information. Toward this end, the agencies are organizing a Global Change Data and Information System (GCDIS), which takes advantage of the mission resources and responsibilities of each agency. Sources for global change data and information are national and international agency programs, including those focused on the USGCRP, such as NASA's Earth Observing System [EOS] and other agency global change initiatives and those contributing to the USGCRP from other agency programs not focused on global change. Data and information include raw data from observation systems, value-added data from data assembly activities, and derived data and information from models and other investigations. Additional data and information are identified from appropriate sources including academia and the international community

  19. 77 FR 55430 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Science.gov (United States)

    2012-09-10

    ... of its regulatory program and abandoned mine land reclamation plan, make grammatical changes, correct... portions of its regulatory program and abandoned mine land reclamation plan, make grammatical changes... Streams. PART 785--REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINING 785.13, 785.14, 785.15...

  20. LLNL Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs

  1. Alumni Views about Educational Administration, Supervision, Planning and Economics Non-Thesis Master’s Program: The Case of Gaziantep University

    Directory of Open Access Journals (Sweden)

    Murat BAĞLIBEL

    2014-12-01

    Full Text Available The aim of this study is to determine alumni views about Educational Administration, Supervision, Planning and Economics Non-Thesis Master’s Program which is carried out in Gaziantep University. The working group of the study consists of 16 participants graduated from Educational Administration, Supervision, Planning and Economics Non-Thesis Master’s Program of Gaziantep University until June, 2013. It is a case study of qualitative research designs. In order to collect research data, semistructured interview method is used. Research data are analyzed with descriptive and content analysis methods in accordance with qualitative research approach. At the end of the study, developing oneself in terms of occupational, personal and social relationships emerged as the reasons of choosing the program for education. The participants specify that the program met their expectations to a large extent. Regulating the program fee, starting distance education program, increasing the number of practical lessons of the program and Ministry of National Education’s giving more importance to the alumni of this Non-Thesis Master’s Program are among the proposals of the study.

  2. Georgetown University generic integrated community energy system GU-ICES demonstration project. Modified work management plan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint. Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.

  3. Generation Expansion Planning With Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    Energy Technology Data Exchange (ETDEWEB)

    Zhan, Yiduo; Zheng, Qipeng P.; Wang, Jianhui; Pinson, Pierre

    2017-07-01

    Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined future uncertainties (i.e., fixed random outcomes with given probabilities). In several recent studies of generation assets' planning (e.g., thermal versus renewable), new findings show that the investment decisions could affect the future uncertainties as well. To this end, this paper proposes a multistage decision-dependent stochastic optimization model for long-term large-scale generation expansion planning, where large amounts of wind power are involved. In the decision-dependent model, the future uncertainties are not only affecting but also affected by the current decisions. In particular, the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming model. The wind penetration, investment decisions, and the optimality of the decision-dependent model are evaluated in a series of multistage case studies. The results show that the proposed decision-dependent model provides effective optimization solutions for long-term generation expansion planning.

  4. Applying national survey results for strategic planning and program improvement: the National Diabetes Education Program.

    Science.gov (United States)

    Griffey, Susan; Piccinino, Linda; Gallivan, Joanne; Lotenberg, Lynne Doner; Tuncer, Diane

    2015-02-01

    Since the 1970s, the federal government has spearheaded major national education programs to reduce the burden of chronic diseases in the United States. These prevention and disease management programs communicate critical information to the public, those affected by the disease, and health care providers. The National Diabetes Education Program (NDEP), the leading federal program on diabetes sponsored by the National Institutes of Health (NIH) and the Centers for Disease Control and Prevention (CDC), uses primary and secondary quantitative data and qualitative audience research to guide program planning and evaluation. Since 2006, the NDEP has filled the gaps in existing quantitative data sources by conducting its own population-based survey, the NDEP National Diabetes Survey (NNDS). The NNDS is conducted every 2–3 years and tracks changes in knowledge, attitudes and practice indicators in key target audiences. This article describes how the NDEP has used the NNDS as a key component of its evaluation framework and how it applies the survey results for strategic planning and program improvement. The NDEP's use of the NNDS illustrates how a program evaluation framework that includes periodic population-based surveys can serve as an evaluation model for similar national health education programs.

  5. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... we are What we do Programs and activities Work with us Contact Us Blog Popular topics Vision ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Breastfeeding myths in ...

  6. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO)

  7. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  8. 76 FR 5774 - Planning and Establishment of Consumer Operated and Oriented Plan Program; Request for Comments...

    Science.gov (United States)

    2011-02-02

    ...) of the Affordable Care Act directs the Secretary to establish a program to foster, through grants and... in feasibility studies, business plans, and marketing plans provided by prospective applicants before... are the advantages and disadvantages of a regional qualified nonprofit issuer or a regional federation...

  9. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  10. Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program

    International Nuclear Information System (INIS)

    2002-01-01

    The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase 'gas generationtesting' shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

  11. The Program Planned for the Molten Salt Reactor Experiment

    International Nuclear Information System (INIS)

    Haubenreich, Paul N.

    1967-01-01

    This document outlines the program planned for the MSRE in fiscal years 1968 and 1969. It includes a bar diagram of the program, a critical-path type diagram of the operations, and a brief description of each task. In addition to the work at the reactor site, the outline also covers activities elsewhere at ORNL and by the AEC that directly affect the reactor schedule. The amount of detail and the accuracy with which we can estimate times varies considerably among the different items on the schedule. Some items, such as annual checkouts and core sample replacement, have been done before and our time estimates do not include any contingency, In the case of such tasks as planning, reviewing, and preparing for experiments or operations, we have set target dates that appear reasonable and we fully expect to meet these. Processing the salt is a different matter. If there are no unforeseen difficulties we should finish easily in the time shown, but the operation is in part a shakedown, so delays would not be too surprising, The time for modifying the system and adding fluoroborate is, of course, uncertain because the requirements are not yet known. As the requirements develop in more detail the estimate will be updated, but we do not foresee any major dislocation in the schedule, The scheduled time for preparation of enriching salt is becoming tight because of delays in facility construction. Should there be further delays in this key item, the entire schedule would have to be reconsidered.

  12. 48 CFR 307.7108 - Statement of work.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW... of the project and the importance of the project to the overall program objectives. (3) A detailed... shall specify separately the work requirements to implement information security management requirements...

  13. The Role of Working Memory in Planning and Generating Written Sentences

    Directory of Open Access Journals (Sweden)

    Ronald T. Kellogg

    2016-02-01

    Full Text Available Planning a sentence with concrete concepts whose referents can be mentally imaged has been shown in past work to require the limited resources of visual working memory. By contrast, grammatically encoding such concepts as lexical items in a syntactic structure requires verbal working memory. We report an experiment designed to demonstrate a double dissociation of these two stores of working memory by manipulating the difficulty of (1 planning by comparing related concepts to unrelated concepts and (2 grammatical encoding of an English sentence in active voice versus the more complex structure of the passive voice. College students (N = 46 composed sentences that were to include two noun prompts (related versus unrelated while concurrently performing either a visual or a verbal distracting task. Instructions to produce either active or passive sentences were manipulated between groups. The results surprisingly indicated that the supposedly easier planning with related concepts made a large demand on verbal working memory, rather than unrelated concepts demanding more visual working memory. The temporal dynamics of the sentence production process appear to best account for the unexpected findings.

  14. [IBM Work and Personal Life Balance Programs.

    Science.gov (United States)

    International Business Machines Corp., Armonk, NY.

    These five brochures describe the IBM Corporation's policies, programs, and initiatives designed to meet the needs of employees' child care and family responsibilities as they move through various stages of employment with IBM. The Work and Personal Life Balance Programs brochure outlines (1) policies for flexible work schedules, including…

  15. International solar-terrestrial physics program: a plan for the core spaceflight missions

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    This brochure has been prepared to describe the scope of the science problems to be investigated and the mission plan for the core International Solar-Terrestrial Physics (ISTP) Program. This information is intended to stimulate discussions and plans for the comprehensive worldwide ISTP Program. The plan for the study of the solar - terrestrial system is included. The Sun, geospace, and Sun-Earth interaction is discussed as is solar dynamics and the origins of solar winds.

  16. Fiscal year 1998 multi-year work plan. Advanced reactors transition program

    International Nuclear Information System (INIS)

    Gantt, D.A.

    1997-01-01

    The mission of the Advanced Reactors Transition program is two-fold. First, the program is to maintain the Fast Flux Test Facility (FFTF) and the Fuels and Materials Examination Facility (FMEF) in Standby to support a possible future role in the tritium production strategy. Secondly, the program is to continue deactivation activities which do not conflict with the Standby directive. On-going deactivation activities include the processing of non-usable, irradiated, FFTF components for storage or disposal; deactivation of Nuclear Energy legacy test facilities; and deactivation of the Plutonium Recycle Test Reactor (PRTR) facility, 309 Building

  17. Understanding Program Planning Theory and Practice in a Feminist Community-Based Organization

    Science.gov (United States)

    Bracken, Susan J.

    2011-01-01

    The purpose of this article is to discuss feminist-program-planning issues, drawing from a critical ethnographic study of a Latin American feminist community-based organization. The research findings discuss the centrality of feminist identity to understanding and analyzing day-to-day program-planning process issues within a feminist…

  18. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  19. Very Low-Cost Nutritious Diet Plans Designed by Linear Programming.

    Science.gov (United States)

    Foytik, Jerry

    1981-01-01

    Provides procedural details of Linear Programing, developed by the U.S. Department of Agriculture to devise a dietary guide for consumers that minimizes food costs without sacrificing nutritional quality. Compares Linear Programming with the Thrifty Food Plan, which has been a basis for allocating coupons under the Food Stamp Program. (CS)

  20. Think Warm Thoughts: Plan Ahead for Summertime Information Literacy Programs! The College Connection

    Science.gov (United States)

    Kasowitz-Scheer, Abby

    2009-01-01

    It's winter! While it is frosty outside, one can at least think warm thoughts by starting now to plan ahead for summer information literacy programs. This article is designed to provide some ideas for planning next summer's reading, sleuthing, and research programs. It features a variety of programs organized by academic librarians this past…

  1. A Peer-Based Financial Planning & Education Service Program: An Innovative Pedagogic Approach

    Science.gov (United States)

    Goetz, Joseph W.; Durband, Dorothy B.; Halley, Ryan E.; Davis, Kimberlee

    2011-01-01

    This paper presents a peer-based financial planning and education program as a strategy to address the lack of financial literacy among college students and provide an experiential learning opportunity for students majoring in financial planning or other financial services-related disciplines. Benefits of such programs to campus communities are…

  2. The Teaching of Work Ethics: Current Practices of Work Program Coordinators in Georgia.

    Science.gov (United States)

    Ford, Frances Annette; Herren, Ray V.

    A study examined the perceptions and practices of 160 work program coordinators in Georgia (44% of the sample) regarding the teaching of work ethics. A literature review had shown that a consistent view of potential employers was that graduates of vocational education programs should be well grounded in the concept of work ethics. The main purpose…

  3. Using business plan development as a capstone project for MPH programs in Canada: validation through the student perspective.

    Science.gov (United States)

    Papadopoulos, Andrew; Britten, Nicole; Hatcher, Meghan; Rainville, Keira

    2013-10-01

    Master of Public Health (MPH) programs have been developed across Canada as a response to the need for adequately trained individuals to work in the public health sector. Educational institutions that deliver MPH programs have a responsibility to ensure that graduates of their program have the essential knowledge, skills and attitudes to begin a successful career in public health. The Public Health Agency of Canada has created the core competencies for public health to guide the development, delivery and evaluation of MPH programs. In Canada, a capstone project is the recommended method of evaluating the MPH graduate's ability to demonstrate proficiency in the public health core competencies. A business plan that develops the framework for a public health program is an ideal capstone project currently used in practice within the University of Guelph MPH program. This group assignment incorporates all 36 of the public health core competencies while providing students with a real-world public health experience, and should be considered for inclusion within MPH programs across Canada. Business planning provides students the opportunity to engage in practice-based learning, applying theoretical knowledge to practice. Further, the ability to develop realistic but financially feasible public health problems is an invaluable skill for MPH graduates. As the development of programs becomes more restricted and the continuation of other programs are under constant threat, the ability to develop a sound business plan is a required skill for individuals entering the public health sector, and will ensure students are able to maximize outcomes given tight fiscal budgets and limited resources.

  4. A research-oriented treatment planning program system

    International Nuclear Information System (INIS)

    Kalet, I.J.; Jacky, J.P.

    1982-01-01

    The function of a treatment planning program is to graphically simulate radiation dose distributions from proposed radiation therapy treatments. While many such programs are available which provide this much-needed service, none addresses the question of how to intercompare calculation and display techniques. This paper describes a program system designed for support of research efforts, particularly development and testing of new calculation algorithms. The system emphasizes a modular flexible structure, enabling programs to be developed somewhat as interchangeable parts. Thus multiple variants of a calculation algorithm can be compared without undue software overhead or additional data management. Unusual features of the system include extensive use of command procedures, logical names and a structured language (PASCAL). These features are described along with other implementation details. Obstacles, limitations and future applications are also discussed. (Auth.)

  5. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    OpenAIRE

    Tunjo Perić; Željko Mandić

    2017-01-01

    This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method) in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained resul...

  6. Older Workers and Federal Work Programs: The Korean Senior Employment Program (KSEP).

    Science.gov (United States)

    Choi, Eunhee

    2016-01-01

    Federal older worker programs are attracting attention due to the growing number of older workers across the world. They are uniquely situated to provide out-of-market work opportunities to older job seekers, who often find their age a barrier to securing desirable jobs. In 2004, the Korean government established its own program, the Korean Senior Employment Program (KSEP); however, literature for international readers on this innovative program is lacking. Thus, this article aims to provide an in-depth description of KSEP and a brief comparison between the Senior Community Service Employment Program in the U.S. and KSEP. The unique characteristics of KSEP include having the dual program foci on supplemental income and social participation; expanding work opportunities in the private sector beyond community-based jobs; accepting participants who are financially disadvantaged as well as those with a high desire for social participation regardless of their income; and broadening work opportunities for those with professional skills beyond repetitive, simple, and temporary jobs. This article may offer helpful insights to older worker advocates from various countries in creating or modifying their programs.

  7. Multiyear Program Plan for the High Temperature Materials Laboratory; FINAL

    International Nuclear Information System (INIS)

    Arvid E. Pasto

    2000-01-01

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO(sub x) and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required

  8. Pilot chargeback system program plan

    International Nuclear Information System (INIS)

    Smith, P.

    1997-03-01

    This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management

  9. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  10. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    International Nuclear Information System (INIS)

    1990-06-01

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs

  11. Tobacco training in clinical social work graduate programs.

    Science.gov (United States)

    Kleinfelder, JoAnn; Price, James H; Dake, Joseph A; Jordan, Timothy R; Price, Joy A

    2013-08-01

    The leading cause of preventable death, in the most vulnerable segments of society, whom social workers often counsel, is cigarette smoking. The purpose of this study was to assess tobacco smoking cessation training in clinical social work programs. A valid 21-item questionnaire was sent to the entire population of 189 clinical graduate social work programs identified by the Council on Social Work Education. A three-wave mailing process was used to maximize the return rate. Directors from 112 clinical social work programs returned completed questionnaires (61 percent). The majority (91 percent) of directors reported having never thought about offering formal smoking cessation training, and only nine of the programs (8 percent) currently provided formal smoking cessation education. The three leading barriers to offering smoking cessation education were as follows: not a priority (60 percent), not enough time (55 percent), and not required by the accrediting body (41 percent). These findings indicate that clinical social work students are not receiving standardized smoking cessation education to assist in improving the well-being of their clients. The national accrediting body for graduate clinical social work programs should consider implementing guidelines for smoking cessation training in the curriculums.

  12. Geothermal-subsidence research program plan and review

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  13. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  14. Strategic planning of an integrated program for state oversight agreements

    International Nuclear Information System (INIS)

    Walzer, A.E.; Cothron, T.K.

    1991-01-01

    Among the barrage of agreements faced by federal facilities are the State Oversight Agreements (known as Agreements in Principle in many states). These agreements between the Department of Energy (DOE) and the states fund the states to conduct independent environmental monitoring and oversight which requires plans, studies, inventories, models, and reports from DOE and its management and operating contractors. Many states have signed such agreements, including Tennessee, Kentucky, Washington, Idaho, Colorado, California, and Florida. This type of oversight agreement originated in Colorado as a result of environmental concerns at the Rocky Flats Plant. The 5-year State Oversight Agreements for Tennessee and Kentucky became effective on May 13, 1991, and fund these states nearly $21 million and $7 million, respectively. Implementation of these open-quotes comprehensive and integratedclose quotes agreements is particularly complex in Tennessee where the DOE Oak Ridge Reservation houses three installations with distinctly different missions. The program development and strategic planning required for coordinating and integrating a program of this magnitude is discussed. Included are the organizational structure and interfaces required to define and coordinate program elements across plants and to also effectively negotiate scope and schedules with the state. The planned Program Management Plan, which will contain implementation and procedural guidelines, and the management control system for detailed tracking of activities and costs are outlined. Additionally, issues inherent in the nature of the agreements and implementation of a program of this magnitude are discussed. Finally, a comparison of the agreements for Tennessee, Kentucky, Colorado, and Idaho is made to gain a better understanding of the similarities and differences in State Oversight Agreements to aid in implementation of these agreements

  15. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  16. Generalizable Skills in Individualized Vocational Program Planning for Special Needs Students.

    Science.gov (United States)

    Stodden, Robert A.; Boone, Rosalie

    1986-01-01

    The authors address planning issues and suggest methods of interagency cooperation, integration of generalizable skills in individualized educational planning/programming, developing goals and objectives, and using student assessment and evaluation information. (CT)

  17. Security Transition Program Office 1994 fiscal year work plan WBS 6.11

    International Nuclear Information System (INIS)

    Brogdon, R.C. Jr.

    1993-10-01

    The Security Transition Program Office (STPO) will change the Hanford Safeguards and Security Protection Program from one that supported the national defense program to one that supports environmental restoration and waste management. A Successful Safeguards and Security Protection Program transition will have an industrial security foundation supplemented to protect material interests and information resources. The transition will change the current approaches to protection philosophy to ones that will provide the Hanford Site with the following: consolidation, reduction, and elimination of safeguards and security interests and targets; greater open Site access; maximum application of technology and automation; interpretation of security policies and procedures in light of the Hanford Site's environmental mission; coexistence with other emergency services; streamlined operations; and protection of employees and the public from health, safety, fire, security, and safeguards risks. This report describes the 1994 program objectives, the technical base, schedule baseline, cost, funding, manpower, and the 1993 program workscope

  18. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  19. Large-scale linear programs in planning and prediction.

    Science.gov (United States)

    2017-06-01

    Large-scale linear programs are at the core of many traffic-related optimization problems in both planning and prediction. Moreover, many of these involve significant uncertainty, and hence are modeled using either chance constraints, or robust optim...

  20. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  1. Drunk Driving Public Information Program Strategies and Planning Guide.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  2. THE NUCLEAR MATERIAL MEASUREMENT PROGRAM PLAN FOR GOSATOMNADZOR OF RUSSIA

    International Nuclear Information System (INIS)

    Bokov, Dmitry; Byers, Kenneth R.

    2003-01-01

    As the Russian State regulatory agency responsible for oversight of nuclear material control and accounting (MC and A), Gosatomnadzor of Russia determines the status of the MC and A programs at Russian facilites by testing the nuclear material inventory for accounting record accuracy. Currently, Gosatomnadzor is developing and implementing an approach to planning and conducting MC and A inspections using non-destructive assay (NDA) instruments that will provide for consistent application of MC and A measurement inspection objectives throughtout Russia. This Gosatomnadzor NDA Program Plan documents current NDA measurement capability in all regions of Gosatomnadzor; provides justification for upgrades to equipment, procedures and training; and defines the inspector-facility operator interface as it relates to NDA measurement equipment use. This plan covers a three-year measurement program cycle, but will be reviewed and updated annually to ensure that adequate inspection resources are available to meet the demands of the inspection schedule. This paper presents the elements of this plan and describes the process by which Gosatomnadzor ensures that its NDA instruments are effectively utilized, procedures are developed and certified, and inspection personnel are properly trained to provide assurance that Russian nuclear facilities are in compliance with Russian MC and A regulations.

  3. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  4. An efficient inverse radiotherapy planning method for VMAT using quadratic programming optimization.

    Science.gov (United States)

    Hoegele, W; Loeschel, R; Merkle, N; Zygmanski, P

    2012-01-01

    The purpose of this study is to investigate the feasibility of an inverse planning optimization approach for the Volumetric Modulated Arc Therapy (VMAT) based on quadratic programming and the projection method. The performance of this method is evaluated against a reference commercial planning system (eclipse(TM) for rapidarc(TM)) for clinically relevant cases. The inverse problem is posed in terms of a linear combination of basis functions representing arclet dose contributions and their respective linear coefficients as degrees of freedom. MLC motion is decomposed into basic motion patterns in an intuitive manner leading to a system of equations with a relatively small number of equations and unknowns. These equations are solved using quadratic programming under certain limiting physical conditions for the solution, such as the avoidance of negative dose during optimization and Monitor Unit reduction. The modeling by the projection method assures a unique treatment plan with beneficial properties, such as the explicit relation between organ weightings and the final dose distribution. Clinical cases studied include prostate and spine treatments. The optimized plans are evaluated by comparing isodose lines, DVH profiles for target and normal organs, and Monitor Units to those obtained by the clinical treatment planning system eclipse(TM). The resulting dose distributions for a prostate (with rectum and bladder as organs at risk), and for a spine case (with kidneys, liver, lung and heart as organs at risk) are presented. Overall, the results indicate that similar plan qualities for quadratic programming (QP) and rapidarc(TM) could be achieved at significantly more efficient computational and planning effort using QP. Additionally, results for the quasimodo phantom [Bohsung et al., "IMRT treatment planning: A comparative inter-system and inter-centre planning exercise of the estro quasimodo group," Radiother. Oncol. 76(3), 354-361 (2005)] are presented as an example

  5. Planning an integrated agriculture and health program and designing its evaluation: Experience from Western Kenya.

    Science.gov (United States)

    Cole, Donald C; Levin, Carol; Loechl, Cornelia; Thiele, Graham; Grant, Frederick; Girard, Aimee Webb; Sindi, Kirimi; Low, Jan

    2016-06-01

    Multi-sectoral programs that involve stakeholders in agriculture, nutrition and health care are essential for responding to nutrition problems such as vitamin A deficiency among pregnant and lactating women and their infants in many poor areas of lower income countries. Yet planning such multi-sectoral programs and designing appropriate evaluations, to respond to different disciplinary cultures of evidence, remain a challenge. We describe the context, program development process, and evaluation design of the Mama SASHA project (Sweetpotato Action for Security and Health in Africa) which promoted production and consumption of a bio-fortified, orange-fleshed sweetpotato (OFSP). In planning the program we drew upon information from needs assessments, stakeholder consultations, and a first round of the implementation evaluation of a pilot project. The multi-disciplinary team worked with partner organizations to develop a program theory of change and an impact pathway which identified aspects of the program that would be monitored and established evaluation methods. Responding to the growing demand for greater rigour in impact evaluations, we carried out quasi-experimental allocation by health facility catchment area, repeat village surveys for assessment of change in intervention and control areas, and longitudinal tracking of individual mother-child pairs. Mid-course corrections in program implementation were informed by program monitoring, regular feedback from implementers and partners' meetings. To assess economic efficiency and provide evidence for scaling we collected data on resources used and project expenses. Managing the multi-sectoral program and the mixed methods evaluation involved bargaining and trade-offs that were deemed essential to respond to the array of stakeholders, program funders and disciplines involved. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  6. Salt Repository Project transportation program plan

    International Nuclear Information System (INIS)

    Fisher, R.L.; Greenberg, A.H.; Anderson, T.L.; Yates, K.R.

    1987-01-01

    The Salt Repository Project (SRP) has the responsibility to develop a comprehensive transportation program plan (TrPP) that treats the transportation of workers, supplies, and high-level radioactive waste to the site and the transportation of salt, low-level, and transuranic wastes from the site. The TrPP has developed a systematic approach to transportation which is directed towards satisfying statutes, regulations, and directives and is guided by a hierarchy of specific functional requirements, strategies, plans, and reports. The TrPP identifies and develops the planning process for transportation-related studies and provides guidance to staff in performing and documenting these activities. The TrPP also includes an explanation of the responsibilities of the organizational elements involved in these transportation studies. Several of the report chapters relate to identifying routes for transporting nuclear waste to the site. These include a chapter on identifying an access corridor for a new rail route leading to the site, identifying and evaluating emergency-response preparedness capabilities along candidate routes in the state, and identifying alternative routes from the state border, ports, or in-state reactors to the site. The TrPP also includes plans for identifying salt disposal routes and a discussion of repository/transportation interface requirements. 89 refs., 6 figs

  7. Biofuels Program Plan, FY 1992--FY 1996. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    This five-year program plan describes the goals and philosophy of the US Department of Energy`s (DOE) Biofuels Systems Division (BSD) program and the BSD`s major research and development (R&D) activities for fiscal years (FY) 1992 through 1996. The plan represents a consensus among government and university researchers, fuel and automotive manufacturers, and current and potential users of alternative fuels and fuel additives produced from biomass. It defines the activities that are necessary to produce versatile, domestic, economical, renewable liquid fuels from biomass feedstocks. The BSD program focuses on the production of alternative liquid fuels for transportation-fuels such as ethanol, methanol, biodiesel, and fuel additives for reformulated gasoline. These fuels can be produced from many plant materials and from a significant portion of the wastes generated by municipalities and industry. Together these raw materials and wastes, or feedstocks, are called biomass.

  8. Salt Repository Project Waste Package Program Plan: Draft

    International Nuclear Information System (INIS)

    Carr, J.A.; Cunnane, J.C.

    1986-01-01

    Under the direction of the Office of Civilian Radioactive Waste Management (OCRWM) created within the DOE by direction of the Nuclear Waste Policy Act of 1982 (NWPA), the mission of the Salt Repository Project (SRP) is to provide for the development of a candidate salt repository for disposal of high-level radioactive waste (HLW) and spent reactor fuel in a manner that fully protects the health and safety of the public and the quality of the environment. In consideration of the program needs and requirements discussed above, the SRP has decided to develop and issue this SRP Waste Package Program Plan. This document is intended to outline how the SRP plans to develop the waste package design and to show, with reasonable assurance, that the developed design will satisfy applicable requirements/performance objectives. 44 refs., 16 figs., 16 tabs

  9. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  10. Are men well served by family planning programs?

    OpenAIRE

    Hardee, Karen; Croce-Galis, Melanie; Gay, Jill

    2017-01-01

    Although the range of contraceptives includes methods for men, namely condoms, vasectomy and withdrawal that men use directly, and the Standard Days Method (SDM) that requires their participation, family planning programming has primarily focused on women. What is known about reaching men as contraceptive users? This paper draws from a review of 47 interventions that reached men and proposes 10 key considerations for strengthening programming for men as contraceptive users. A review of progra...

  11. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  12. Electric generating capacity planning: A nonlinear programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Yakin, M.Z.; McFarland, J.W.

    1987-02-01

    This paper presents a nonlinear programming approach for long-range generating capacity expansion planning in electrical power systems. The objective in the model is the minimization of total cost consisting of investment cost plus generation cost for a multi-year planning horizon. Reliability constraints are imposed by using standard and practical reserve margin requirements. State equations representing the dynamic aspect of the problem are included. The electricity demand (load) and plant availabilities are treated as random variables, and the method of cumulants is used to calculate the expected energy generated by each plant in each year of the planning horizon. The resulting model has a (highly) nonlinear objective function and linear constraints. The planning model is solved over the multiyear planning horizon instead of decomposing it into one-year period problems. This approach helps the utility decision maker to carry out extensive sensitivity analysis easily. A case study example is provided using EPRI test data. Relationships among the reserve margin, total cost and surplus energy generating capacity over the planning horizon are explored by analyzing the model.

  13. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    1987-08-01

    This report was prepared to illustrate the policy and actions that the State of Nevada believe are required to assure that the quality of the environment is adequately considered during the course of the DOE work at the proposed high-level nuclear waste repository at Yucca Mountain. The report describes the DOE environmental program and the studies planned by NWPO to reflect the State's position toward environmental protection. 41 refs., 2 figs., 11 tabs

  14. Senior dental students' career intentions, work-life balance and retirement plans.

    Science.gov (United States)

    Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D

    2007-09-08

    To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p work full time. Although the majority (65%) intend to work in general practice significant numbers (19%) wish to have a career in hospital dentistry and very few (3%) in community dentistry. Senior students seem to show no more commitment to the NHS than those in our previous study of dental school applicants. Only 3% intend to work exclusively for the NHS and 18% intend to work exclusively in the private sector. Surprising numbers had plans to retire or go part time before 60 years of age. Only 20% of the sample intended to continue working full time after the age of 60 years. The mode age that those surveyed intended to start a family was 30 years and a large majority of both sexes thought this would interrupt their professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.

  15. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... we are What we do Programs and activities Work with us Contact Us Blog Popular topics Vision and mission Leadership Programs and activities In your community Funding opportunities Internships and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural ...

  16. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  17. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  18. CSSP implementation plan for space plasma physics programs

    International Nuclear Information System (INIS)

    Baker, D.N.; Williams, D.J.; Johns Hopkins Univ., Laurel, MD)

    1985-01-01

    The Committee on Solar and Space Physics (CSSP) has provided NASA with guidance in the areas of solar, heliospheric, magnetospheric, and upper atmospheric research. The budgetary sitation confronted by NASA has called for a prioritized plane for the implementation of solar and space plasma physics programs. CSSP has developed the following recommendations: (1) continue implementation of both the Upper Atmosphere Research Satellite and Solar Optical Telescope programs; (2) initiate the International Solar Terrestrial Physics program; (3) plan for later major free-flying missions and carry out the technology development they require; (4) launch an average of one solar and space physics Explorer per yr beginning in 1990; (5) enhance current Shuttle/Spacelab programs; (6) develop facility-class instrumentation; (7) augment the solar terrestrial theory program by FY 1990; (8) support a compute modeling program; (9) strengthen the research and analysis program; and (10) maintain a stable suborbital program for flexible science objectives in upper atmosphere and space plasma physics

  19. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  20. Quality Assurance program plan - plutonium stabilization and handling project W-460

    International Nuclear Information System (INIS)

    SCHULTZ, J.W.

    1999-01-01

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460