WorldWideScience

Sample records for planning design construction

  1. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  2. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  3. Constructing a modern cytology laboratory: A toolkit for planning and design.

    Science.gov (United States)

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction

  4. Constructing a modern cytology laboratory: A toolkit for planning and design

    Directory of Open Access Journals (Sweden)

    Janie Roberson

    2013-01-01

    Full Text Available Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD, Design Development (DD, Construction Documents (CD and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding

  5. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    Science.gov (United States)

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  6. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  7. 7 CFR 1717.605 - Design standards, plans and specifications, construction standards, and RUS accepted materials.

    Science.gov (United States)

    2010-01-01

    ..., construction standards, and RUS accepted materials. 1717.605 Section 1717.605 Agriculture Regulations of the... standards, plans and specifications, construction standards, and RUS accepted materials. All borrowers... system design, construction standards, and the use of RUS accepted materials. Borrowers must comply with...

  8. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  9. Situation thinking as an aid to organizing and planning the construction effort

    International Nuclear Information System (INIS)

    Stull, J.O.

    1976-01-01

    Constructibility of a nuclear project design can be improved by assigning experienced construction men to work with the design engineers. A construction sequence can be developed using a small scale model simulating the various stages of construction. Seeing a simulated situation dictates a conclusion to the experienced construction man which can be explained and is usually acceptable to all. The result is a unified team effort and a good constructible design. Photos of the model in a Work Plan Book provide an effective medium for transferring this planned sequence to the constructor. Slides can quickly express the plan to management and the client. Working with engineers on design models and using a standard identification program for systems and buildings can be an aid to construction. Cross-reference requirements which complicate field and office work can be minimized by developing standard identifiers for buildings and systems. Review of design models by construction men can provide access for construction, eliminate delays and costly out-of-sequence work

  10. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  11. Beyond Design: The Importance of Construction and Post-Construction Phases in Green Developments

    Directory of Open Access Journals (Sweden)

    Mark Hostetler

    2010-04-01

    Full Text Available Green developments are becoming a popular land use planning concept that attempts to accommodate growth while minimizing impacts on natural resources. Various policies encourage conservation designs that usually translate into the clustering of homes and the conservation of some percentage of open space. However, the success of a design is determined by what happens during the construction and post-construction phases of a subdivision project. These two phases are often ignored in land use planning and given only minimal attention by built environment professionals. As a result, green developments may not be functioning as originally intended. This essay discusses the importance of construction and post-construction and a way forward to create functional, sustainable communities. Construction activities and decisions, such as impacts from earthwork machines, improper protection of conserved open spaces and trees, the choice of plants used for yards and common areas, and the storage of construction material all can lead to severe impacts on natural areas both within and surrounding a development site. During post-construction, a variety of improper management practices by homeowners can compromise the sustainability of a development. Developers and associated environmental consultant teams could implement approaches that would engage contractors and residents, such as environmental construction covenants and the installment of a neighborhood, environmental education program. To increase the adoption of relevant construction and post-construction practices, appropriate policies need to be created. However, the shift will only occur once the planning and built environment community acknowledges that design is only the first step towards sustainability. Academic design studios and continuing education courses can help with this culture shift by including construction and post-construction considerations within their curriculum.

  12. Using Augmented Reality to Plan Virtual Construction Worksite

    Directory of Open Access Journals (Sweden)

    Xiangyu Wang

    2007-12-01

    Full Text Available Current construction worksite layout planning heavily relies on 2D paper media where the worksite planners sketch the future layout adjacent to their real environment. This traditional approach turns out to be ineffective and prone to error because only experienced and well-trained planners are able to generate the effective layout design with paper sketch. Augmented Reality (AR, as a new user interface technology, introduces a completely new perspective for construction worksite planning. This paper disucsses the related AR work and issues in construction and describes the concept and prototype of an AR-based construction planning tool, AR Planner with virtual elements sets and tangible interface. The focus of the paper is to identify and integrate worksite planning rules into the AR planner with the purpose of intelligently preventing potential planning errors and process inefficiency, thus maximizing the overall productivity. Future work includes refining and verifying AR Planner in realistic projects.

  13. Using Augmented Reality to Plan Virtual Construction Worksite

    Directory of Open Access Journals (Sweden)

    Xiangyu Wang

    2008-11-01

    Full Text Available Current construction worksite layout planning heavily relies on 2D paper media where the worksite planners sketch the future layout adjacent to their real environment. This traditional approach turns out to be ineffective and prone to error because only experienced and well-trained planners are able to generate the effective layout design with paper sketch. Augmented Reality (AR, as a new user interface technology, introduces a completely new perspective for construction worksite planning. This paper disucsses the related AR work and issues in construction and describes the concept and prototype of an AR-based construction planning tool, AR Planner with virtual elements sets and tangible interface. The focus of the paper is to identify and integrate worksite planning rules into the AR planner with the purpose of intelligently preventing potential planning errors and process inefficiency, thus maximizing the overall productivity. Future work includes refining and verifying AR Planner in realistic projects.

  14. 41 CFR 102-76.15 - What are design and construction services?

    Science.gov (United States)

    2010-07-01

    ... CONSTRUCTION Design and Construction § 102-76.15 What are design and construction services? Design and construction services are— (a) Site planning and landscape design; (b) Architectural and interior design; and... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are design and...

  15. Design and construction of hazardous waste landfill components

    International Nuclear Information System (INIS)

    Frano, A.J.; Numes, G.S.

    1985-01-01

    This paper discusses design and construction of two sections of a hazardous waste landfill at Peoria Disposal Company's hazardous waste management facilities in central Illinois. One section, an existing disposal facility, was retrofitted with leachate control and containment features for additional security. The second section, a new facility which had been previously permitted for development with a single clay liner, was modified to include a double liner and revised leachate collection system for additional security, and an all-weather construction and operation access ramp. The two sections of the landfill were granted a development permit allowing construction. An operating permit was granted after construction and certification by the designer allowing waste disposal operations. The sections will be accepting waste material at publication. Design and construction included: planning studies, design analyses, permitting, preparation of construction contract documents, construction assistance, monitoring construction, and certification

  16. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  17. AP1000 design and construction integration

    International Nuclear Information System (INIS)

    Winters, James W.; Clelland, Jill A.

    2004-01-01

    design of this structure. It then was married to the overall construction plan in '4D' to ensure that the detail design did or did not impact the overall construction duration. With the extensive AP1000 3D design model graphics linked to a construction schedule during the design process, better reviews could be performed. Using '4D' techniques will be integrated more and more into the AP1000 design process as time goes on. (authors)

  18. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  19. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  20. Building Information Modeling for Managing Design and Construction

    DEFF Research Database (Denmark)

    Berard, Ole Bengt

    outcome of construction work. Even though contractors regularly encounter design information problems, these issues are accepted as a condition of doing business and better design information has yet to be defined. Building information modeling has the inherent promise of improving the quality of design...... information for work tasks. * Amount of Information – the number of documents and files, and other media, should be appropriate for the scope. The criteria were identified by empirical studies and theory on information quality in the architectural, engineering and construction (AEC) industry and other fields......Contractors planning and executing construction work encounter many kinds of problems with design information, such as uncoordinated drawings and specification, missing relevant information, and late delivery of design information. Research has shown that missing design information and unintended...

  1. Complete self-sufficiency planning: designing and building disaster-ready hospitals.

    Science.gov (United States)

    Brands, Chad K; Hernandez, Raquel G; Stenberg, Arnold; Carnes, Gary; Ellen, Jonathan; Epstein, Michael; Strouse, Timothy

    2013-01-01

    The need for healthcare systems and academic medical centers to be optimally prepared in the event of a disaster is well documented. Events such as Hurricane Katrina demonstrate a major gap in disaster preparedness for at-risk medical institutions. To address this gap, we outline the components of complete self-sufficiency planning in designing and building hospitals that will function at full operational capacity in the event of a disaster. We review the processes used and outcomes achieved in building a new critical access, freestanding children's hospital in Florida. Given that hurricanes are the most frequently occurring natural disaster in Florida, the executive leadership of our hospital determined that we should be prepared for worst-case scenarios in the design and construction of a new hospital. A comprehensive vulnerability assessment was performed. A building planning process that engaged all of the stakeholders was used during the planning and design phases. Subsequent executive-level review and discussions determined that a disaster would require the services of a fully functional hospital. Lessons learned from our own institution's previous experiences and those of medical centers involved in the Hurricane Katrina disaster were informative and incorporated into an innovative set of hospital design elements used for construction of a new hospital with full operational capacity in a disaster. A freestanding children's hospital was constructed using a new framework for disaster planning and preparedness that we have termed complete self-sufficiency planning. We propose the use of complete self-sufficiency planning as a best practice for disaster preparedness in the design and construction of new hospital facilities.

  2. Airport Planning and Design - Legal and Professional Competence Requirements

    Science.gov (United States)

    Kazda, Antonin

    2017-12-01

    Airport design and planning considerably differs from the design of other transport infrastructure. The reasons are the wide scope of regulation in civil aviation and the lack of links between the Civil Aviation Act and the Building Act. The effect is that the sequence of procedures, negotiation, and/or document approval is not clearly defined. The situation is further complicated by the fact that an airport is a unique construction both for the investor and for the local building authority. The paper is an outcome of our research, building on long-term experience in airport planning and design, and the elucidation of planning and approval processes with experts from the Transport Authority and the Ministry of Transport and Construction of the Slovak Republic.

  3. Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2015). Development of design and construction planning and countermeasure technologies (Contract research)

    International Nuclear Information System (INIS)

    Toguri, Satohito; Kobayashi, Shinji; Tsuji, Masakuni; Yahagi, Ryoji; Yamada, Toshiko; Matsui, Hiroya; Mikake, Shinichiro; Aoyagi, Yoshiaki; Sato, Toshinori

    2017-03-01

    The study on engineering technology in the Mizunami Underground Research Laboratory (MIU) project roughly consists of (1)development of design and construction planning technologies, (2)development of construction technology, (3)development of countermeasure technology, (4)development of technology for security, and (5) development of technologies regarding restoration and mitigating of the excavation effect. So far, the verification of the initial design based on the data obtained during excavation was mainly conducted as a research in the Construction Phase, also the countermeasure technologies to control groundwater inflow were examined as a research in the Operation Phase. In FY2015, as a part of the important issues on the research program, “Development of countermeasure technologies for reducing groundwater inflow” in the Japan Atomic Energy Agency 3rd Midterm Plan, water-tight grouting method has been developed. Grouting methods utilized in the MIU were evaluated and the post-excavation grouting at the -500m Access/Research Gallery-South was planned based on these evaluation results. Also, technology development from the viewpoint of geological disposal was summarized, and information on the alternative method to the grouting method was collected and organized. (author)

  4. Development of Secondary Route Bridge Design Plan Guides

    Science.gov (United States)

    2018-03-03

    The objective of this study is to develop a set of bridge plan guides for low-volume traffic roads. The purpose of the plans is to facilitate construction of new structures suitable for local agencies. The designs are to specifically address common l...

  5. Handbook factory planning and design

    CERN Document Server

    Wiendahl, Hans-Peter; Nyhuis, Peter

    2015-01-01

    This handbook introduces a methodical approach and pragmatic concept for the planning and design of changeable factories that act in strategic alliances to supply the ever-changing needs of the global market. In the first part, the change drivers of manufacturing enterprises and the resulting new challenges are considered in detail with focus on an appropriate change potential. The second part concerns the design of the production facilities and systems on the factory levels work place, section, building and site under functional, organisational, architectural and strategic aspects keeping in mind the environmental, health and safety aspects including corporate social responsibility. The third part is dedicated to the planning and design method that is based on a synergetic interaction of process and space. The accompanying project management of the planning and construction phase and the facility management for the effective utilization of the built premises close the book. -        Concise overview o...

  6. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  7. 3D design terrain models for construction plans and GPS control of highway construction equipment.

    Science.gov (United States)

    2010-03-01

    Research was conducted with the objectives of 1) identifying and characterizing benefits and technological, institutional, cultural, and : legal impediments associated with adoption of 3D design and construction technologies, identifying strategies t...

  8. Measurement plan and observational construction program on drift excavation at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Yamaguchi, Takehiro; Funaki, Hironori; Fujikawa, Daisuke; Tsusaka, Kimikazu

    2008-09-01

    The Horonobe URL Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D' on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. On the Horonobe URL Project, 'Phase 1' was finished in 2005FY and construction of the underground facility was started since then. Now, 'Phase 2' (investigations during construction of the underground facilities) is on-going. On the 'Development of engineering techniques for use in the deep underground environment' in Phase 1, based on the various types of data acquired on investigations from the surface, the design of underground facility in advance was planned. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe URL Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes followings from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment model estimated before shaft excavation, and it is on-going. This report summarizes the measurement plan during construction of drifts based on the design in advance and the observational construction program for feedback measurements data into design and construction on subsequent steps. This report also describes about design and construction management program of underground facility and R and D program on

  9. Biogas plants: Design, construction and operation

    International Nuclear Information System (INIS)

    2001-01-01

    At the big readiness of waste coming from the agricultural activities are looked for the production of Energy and Payments, the biogas like product of the organic decomposition under anaerobic conditions, their composition and characteristic. The elements that conform the design as the digester, the storage, the load tanks and it discharges and the conduction is described and analyzed. They are given a series of elements to obtain the characteristics of the system possible to place as: planning, calculations, evaluation, execution and operation. Lastly the steps are indicated that should be continued in the construction of the plant including planning for the work

  10. Planning, design, and construction of nuclear power plants: an overview. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rhodes, D.A.; Rad, P.F.

    1977-12-01

    Chapters are included on generation system descriptions and alternative energy sources; load forecasting and growth projections; utility studies, program development, and analytical models; organizational alternatives and contract arrangements; project control in the design and construction phase; site management activities; construction activities; and startup and testing.

  11. Planning, design, and construction of nuclear power plants: an overview. Final report

    International Nuclear Information System (INIS)

    Rhodes, D.A.; Rad, P.F.

    1977-12-01

    Chapters are included on generation system descriptions and alternative energy sources; load forecasting and growth projections; utility studies, program development, and analytical models; organizational alternatives and contract arrangements; project control in the design and construction phase; site management activities; construction activities; and startup and testing

  12. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  13. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  14. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Science.gov (United States)

    2010-04-01

    ... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian... funds be used for road construction and other projects? Yes, any tribe can request to have its planning... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road...

  15. Design, construction and description of a triple axis neutron crystal spectrometer

    International Nuclear Information System (INIS)

    Fulfaro, R.; Vinhas, L.A.; Fuhrmann, C.; Liguori Neto, R.; Parente, C.B.R.

    1977-01-01

    Integrating the neutron inelastic scattering plan in IEA (Sao Paulo, Brazil) it was completely designed and constructed there, a triple axis neutron spectrometer. The details about construction and design of the spectrometer are described. Basic principles about the experimental method which utilizes neutron coherent inelastic scattering in order to determine the relation dispersion between frequency and wave vector of the crystalline vibrations, are presented [pt

  16. Future plans for the design and construction of fast reactor power stations in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kempken, M.; Koehler, M.; Wolff, M.

    1978-01-01

    Some important design features of future fast reactors in the Federal Republic of Germany (FRG) are presented, in particular for the demonstration plant SNR 2 which is to follow the prototype SNR 300, presently under construction in Kalkar. The SNR 2 conceptual design will be based on the SNR 300 design as far as possible. Programmes for the introduction of fast breeder reactor power stations on the part of the governments, the utilities and suppliers are based on broad international co-operation. The FRG is a country which imports a high proportion of its primary energy and it has rather small resources of natural uranium. The natural uranium realistically available to the FRG will allow nuclear energy to play a substantial role in the long-term energy supply only if present uranium utilization based on LWRs is supplemented and replaced by breeder reactor utilization later. To maintain this option, efforts towards the development, design and construction of fast breeder reactors have to be intensively continued in the FRG. The construction of the first large power station with a fast breeder reactor, SNR 2, will, according to present planning, start in the middle of the 80s. Operation can be expected to start at the beginning of the 90s. The present fast breeder programme in the FRG promises to develop reactors, reprocessing and fuel manufacturing plants to such a degree that by the end of this century the introduction of a substantial number of fast reactor power stations will be possible. (author)

  17. Design and construction of an impulse turbine

    Science.gov (United States)

    Hernández, E.

    2013-11-01

    Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic.

  18. Design and construction of an impulse turbine

    International Nuclear Information System (INIS)

    Hernández, E

    2013-01-01

    Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic

  19. IMPROVING THE QUALITY OF INVESTMENT DESIGN IN INDUSTRIAL CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    I. M. Meylanov

    2017-01-01

    Full Text Available Objectives. The development of a set of practical measures in order to improve the quality of investment design in industrial construction.Methods. The basis of research comprises a project management methodology as well as methods for logical and statistical analysis of decisionmaking in investment activities.Results. A mechanism of inclusion of industrial construction objects into the Federal targeted investment programme is revealed. The sequence of the state expert evaluation of investment projects is determined, which optimises the design solutions aimed at minimising their estimated cost if the investment is made with the involvement of the Federal budget. Qualitative and quantitative criteria are systematised for the integrated assessment of the effectiveness of investment fund usage sent to industrial construction objects.Conclusion. The consistent implementation of the state investment policy is aimed at developing the scientific-technological and scientific-industrial potential of industrial construction by providing favourable conditions for effective innovation activity, selecting rational investment strategies and priority projects aimed at solving urgent problems of improving the competitiveness of construction. Successful implementation of the state investment policy in industrial construction largely depends on the effectiveness of investment design, starting from the accuracy of the formulation of the investment plan (idea, in which the interests of all participants in investment activities are concentrated and taken into account, and to the development of an agreed set of actions to complete the project. A unified register covering the data on the cost and results of investment projects is proposed to be created with the purpose of facilitating decision-making in the process of allocation of the Federal budget funds, planning of state capital investments and approval of project documentation for new industrial construction

  20. Theoretical Framework and Model Design for Beautiful Countryside Construction in China

    Directory of Open Access Journals (Sweden)

    ZHENG Xiang-qun

    2015-04-01

    Full Text Available In the context of China today, the process of beautiful countryside construction mainly imitates the patterns of‘urbanization’construction. However, this approach leads to the loss of countryside characteristics and the separation of agricultural culture. Therefore, it's urgent to carry out research of the theoretical framework and model design for beautiful countryside construction. In this paper, based on the analysis of the beautiful countryside construction connotation, the basic theory of beautiful countryside construction was summarized in three aspects: rural complex ecosystem model, multi-functionality of rural model and sustainable development evaluation model. The basic idea of the beautiful countryside construction mode was studied. The design method of beautiful countryside construction mode was proposed in three levels: planning, scheming and evaluating. The research results might offer scientific reference for improving the scientific and operational nature of beautiful countryside construction.

  1. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  2. Design and construction of multi research reactor

    International Nuclear Information System (INIS)

    1985-05-01

    This is the report about design and construction of multi research reactor, which introduces the purpose and necessity of the project, business contents, plan of progress of project and budget for the project. There are three appendixes about status of research reactor in other country, a characteristic of research reactor, three charts about evaluation, process and budget for the multi research reactor and three drawings for the project.

  3. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  4. Bicycle-friendly infrastructure planning in Beijing and Copenhagen - between adapting design solutions and learning local planning cultures

    DEFF Research Database (Denmark)

    Zhao, Chunli; Carstensen, Trine Agervig; Nielsen, Thomas Alexander Sick

    2018-01-01

    Abstract Cities around the world are constructing bicycle infrastructure to increase cycling. However, identifying efficient design solutions and determining how bicycle infrastructure planning knowledge can be integrated into comprehensive policy remains a challenge. The objective of this paper...... is to shed light on the strengths and weaknesses of current bicycle infrastructure planning in both an experienced city, Copenhagen, and in a less experienced city, Beijing. The paper examines how local design solutions are identified, how efficient they are and to what extent bicycle infrastructure planning...

  5. CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.

    Science.gov (United States)

    Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj

    2018-01-01

    Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.

  6. Learning from nuclear waste repository design: the ground-control plan

    International Nuclear Information System (INIS)

    Schmidt, B.

    1988-01-01

    At present, under a U.S. Department of Energy program, three repositories for commercial spent fuel-in salt, tuff and basalt-are in the phase of site characterization and conceptual design, and one pilot project for defense waste in salt is under development. Because of strict quality assurance requirements throughout design and construction, and the need to predict and ascertain in advance the satisfactory performance of the underground openings, underground openings in the unusual circumstances of the repository environment have been analysed. This will lead to an improved understanding of rock behavior and improved methods of underground analysis and design. A formalized ground control plan was developed, the principles of which may be applied to other types of projects. This paper summarizes the status of underground design and construction for nuclear waste repositories and presents some details of the ground control plan and its individual elements. (author)

  7. Planning and design considerations in karst terrain

    Science.gov (United States)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures

  8. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  9. Advancing Integrated STEM Learning through Engineering Design: Sixth-Grade Students' Design and Construction of Earthquake Resistant Buildings

    Science.gov (United States)

    English, Lyn D.; King, Donna; Smeed, Joanna

    2017-01-01

    As part of a 3-year longitudinal study, 136 sixth-grade students completed an engineering-based problem on earthquakes involving integrated STEM learning. Students employed engineering design processes and STEM disciplinary knowledge to plan, sketch, then construct a building designed to withstand earthquake damage, taking into account a number of…

  10. How to Construct a Mixed Methods Research Design.

    Science.gov (United States)

    Schoonenboom, Judith; Johnson, R Burke

    2017-01-01

    This article provides researchers with knowledge of how to design a high quality mixed methods research study. To design a mixed study, researchers must understand and carefully consider each of the dimensions of mixed methods design, and always keep an eye on the issue of validity. We explain the seven major design dimensions: purpose, theoretical drive, timing (simultaneity and dependency), point of integration, typological versus interactive design approaches, planned versus emergent design, and design complexity. There also are multiple secondary dimensions that need to be considered during the design process. We explain ten secondary dimensions of design to be considered for each research study. We also provide two case studies showing how the mixed designs were constructed.

  11. Low Impact Development Intensive Rural Construction Planning in Xu Fu Village Ningbo, China: Planning Review through Rural Resilience Perspective

    Directory of Open Access Journals (Sweden)

    Roosmayri Lovina Hermaputi

    2017-08-01

    Full Text Available Xu Fu Village Ningbo LID Intensive Rural Construction Planning is a cooperation project between Zhejiang University and Ningbo Institute of Technology which named "12th Five-Year National Science and Technology support program-the comprehensive demonstration of the key technology of the beautiful rural construction in the rapid urbanization area of the Yangtze River Delta". This plan focuses on intensive rural construction as part of rural development and construction project that applies the principles of low impact development. Xu Fu Village located in the Yangtze River Delta Region. Currently, the rural growth brings the high impact of development, as a result of rapid urbanization growth arising several issues, such as low land use efficiency, dispersed rural residence, homestead occupies more, rural roads covering over, etc. Meanwhile, Xu Fu village wishes to develop its tourism potential. Thus, the intensive rural construction should be done to avoid the severe effect. The project result hopefully can improve the quality and level of rural residential planning, design, and construction; improve their living environment; save construction land and water use; and improve energy efficiency. The aim of this study is to review the Low Impact Development (LID Intensive Rural Construction in Xu Fu Village, Ningbo City through the rural resilience perspective. This paper will describe the project plan first, then review it through rural resilience perspective. This paper will elaborate the rural resilience theory and then review the rural resiliency through two parts; the first part is identifying rural resilience in rural infrastructure development based on the criteria created by Ayyob S. and Yoshiki Y. (2014, about urban resiliency criteria, and then the second part is reviewing Xu Fu Village resilience through Arup Resilience Qualities (2012, considering three rural resilience domain (economy, ecology, and cultural.

  12. MMSW. A large-size micromegas quadruplet prototype. Design and construction

    Energy Technology Data Exchange (ETDEWEB)

    Kuger, Fabian; Sidiropoulou, Ourania [Julius Maximilians Universitaet, Wuerzburg (Germany); European Organization for Nuclear Research (CERN), Geneva (Switzerland); Bianco, Michele; Danielsson, Hans; Degrange, Jordan; Oliveira, Rui de; Farina, Eduardo; Iengo, Paolo; Perez Gomez, Francisco; Sekhniaidze, Givi; Sforza, Federico; Vergain, Maurice; Wotschack, Joerg [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Duedder, Andreas; Lin, Tai-Hua; Schott, Matthias [Johannes Gutenberg-Universitaet, Mainz (Germany)

    2016-07-01

    Two micromegas detector quadruplets with an area of 0.5 m{sup 2} (MMSW) have been recently constructed and tested at CERN and University of Mainz. They serve as prototypes for the planned upgrade project of the ATLAS muon system. Their design is based on the resistive-strip technology and thus renders the detectors spark tolerant. The applied 'mechanically floating' mesh design allows for large area Micromegas construction and facilitates detector cleaning before assembly. Each quadruplet comprises four detection layers with 1024 readout strips and a strip pitch of 415 μm. In two out of the four layers the strips are inclined by ± 1.5 to allow for the measurement of a second coordinate. We present the detector concept and report on the experience gained during the detector construction.

  13. Combinatorial designs constructions and analysis

    CERN Document Server

    Stinson, Douglas R

    2004-01-01

    Created to teach students many of the most important techniques used for constructing combinatorial designs, this is an ideal textbook for advanced undergraduate and graduate courses in combinatorial design theory. The text features clear explanations of basic designs, such as Steiner and Kirkman triple systems, mutual orthogonal Latin squares, finite projective and affine planes, and Steiner quadruple systems. In these settings, the student will master various construction techniques, both classic and modern, and will be well-prepared to construct a vast array of combinatorial designs. Design theory offers a progressive approach to the subject, with carefully ordered results. It begins with simple constructions that gradually increase in complexity. Each design has a construction that contains new ideas or that reinforces and builds upon similar ideas previously introduced. A new text/reference covering all apsects of modern combinatorial design theory. Graduates and professionals in computer science, applie...

  14. Managing the construction bidding process : a move to simpler construction plan sets

    Science.gov (United States)

    2001-01-31

    This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...

  15. Construction technique for a chemical plant (II)

    International Nuclear Information System (INIS)

    1978-08-01

    This book deals with design and construction for a chemical plant which includes design and building of steel structure for a chemical plant with types, basic regulation, plan, shop fabrication for steel structure and field construction. It explains design and construction of making building for a chemical construction with measurement, types of building and basic rule of the building, design of the building, constructing plumbing for a chemical plant with plan, management of material, checking for construction, construction of electrical installation on plan, know-how to construction and maintenance.

  16. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  17. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  18. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  19. Designs 2002 further computational and constructive design theory

    CERN Document Server

    2003-01-01

    This volume is a sequel to the 1996 compilation, Computational and Constructive Design Theory. It contains research papers and surveys of recent research work on two closely related aspects of the study of combinatorial designs: design construction and computer-aided study of designs. Audience: This volume is suitable for researchers in the theory of combinatorial designs

  20. Construction Analysis during the Design Process

    NARCIS (Netherlands)

    Vries, de B.; Harink, J.M.J.; Martens, B.; Brown, A.

    2005-01-01

    4D CAD systems are used by contractors for visually checking the construction process. To enable simulation of the construction process, the construction planner links building components from a CAD model with the activities from a project planning. In this paper we describe a method to generate a

  1. Design, construction and monitoring of temporary storage facilities for removed contaminants

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Funaki, Hironori; Kurikami, Hiroshi; Sakamoto, Yoshiaki; Tokizawa, Takayuki

    2013-01-01

    Since the Fukushima Daiichi nuclear power plant accident caused by the Tohoku Region Pacific Coast Earthquake on March 11, 2011, decontamination work has been conducted in the surrounding environment within the Fukushima prefecture. Removed contaminants including soil, grass and trees are to be stored safely at temporary storage facilities for up to three years, after which they will be transferred to a planned interim storage facility. The decontamination pilot project was carried out in both the restricted and planned evacuation areas in order to assess decontamination methods and demonstrate measures for radiation protection of workers. Fourteen temporary storage facilities of different technical specifications were designed and constructed under various topographic conditions and land use. In order to support the design, construction and monitoring of temporary storage facilities for removed contaminants during the full-scale decontamination within the prefecture of Fukushima, technical know-how obtained during the decontamination pilot project has been identified and summarized in this paper. (author)

  2. Digital building planning - digital construction; Digitale Gebaeudeplanung - digitales Bauen

    Energy Technology Data Exchange (ETDEWEB)

    Friedrichs, K. [Karlsruhe Univ. (T.H.) (Germany). Fakultaet fuer Architektur

    1995-12-31

    In chapter 3 of the anthology about building control the following aspects are discussed: digital building planning and digital construction, which are characterised by an increasing complexity of planning, buildings, construction technology and construction processes. In this respect the digital-technical scenarios, passive and active objects as well as digital construction are described. (BWI) [Deutsch] Kapitel 3 des Sammelbandes ueber Building Control ist den Themen Digitale Gebaeudeplanung und Digitales Bauen gewidmet, die durch die zunehmende Komplexitaet von Planung, Gebaeuden, Bautechnologien und -prozessen bedingt sind. In diesem Zusammenhang werden folgende Themen angesprochen: Digitale technische Szenarien, passive und aktive Objekte sowie digitales Bauen. (BWI)

  3. [Design for constructability studies in support of the DOE ALWR (Advanced Light Water Reactor) Program

    International Nuclear Information System (INIS)

    1990-03-01

    This technical report accounts for work performed as part of Duke Power Company's Design for Constructability Program. This program is contractual agreement AC03-86SF16566, part of the US Department of Energy's Technology Program in Support of Advanced Light Water Reactors. This report covers the period from contract inception (September 1986) through completion (March 1990). This report is divided into 4 volumes. Volume 1 includes the executive summary and significant program conclusions. The details supporting these conclusions are in Volume 3, Improving Construction Performance, and Volume 4, Enchancing Constructability Through Design. Volume 2 includes a description of the program, objectives, and approach. A significant conclusion from these discussions was the identification of a ''missing link'' in ALWR programs. With an essentially complete, certified design, the majority of the up-front planning and preparation for implementing the design can be accomplished. Though a monumental undertaking beyond the scope of this project, this up-front planning and preparation must be considered as the next logical step for standardization. Much of the planning can be repeated with future plants and marketed to recoup expenditures. Devoting resources to develop the standard design (evolutionary or passive) to a marketable, standard, and comprehensive plant package is essential to revitalizing the option of nuclear energy. The DOE should seriously consider devoting these resources as a logical extension of its ALWR support

  4. Revision of construction plan for advanced thermal demonstration reactor

    International Nuclear Information System (INIS)

    1996-01-01

    The Federation of Electric Power Companies demanded the revision of the construction plan for the advanced thermal demonstration reactor, which is included in the 'Long term plan on the research, development and utilization of atomic energy' decided by the Atomic Energy Commission in 1994, for economical reason. The Atomic Energy Commission carried out the deliberation on this demand. It was found that the cost of construction increases to 580 billion yen, and the cost of electric power generation increases three times as high as that of LWRs. The role as the reactor that utilizes MOX fuel can be substituted by LWRs. The relation of trust with the local town must be considered. In view of these circumstances, it is judged that the stoppage of the construction plan is appropriate. It is necessary to investigate the substitute plan for the stoppage, and the viewpoints of investigating the substitute plan, the examination of the advanced BWR with all MOX fuel core and the method of advancing its construction are considered. On the research and development related to advanced thermal reactors, the research and development contributing to the advance of nuclear fuel recycling are advanced, and the prototype reactor 'Fugen' is utilized. (K.I.)

  5. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: GENERAL Environmental Review... the basis of how well they: (a) Reflect the use of best available technology in design, construction... plans to minimize the possibility and consequences of pollution incidents such as spills and discharges...

  6. Integral stormwater management master plan and design in an ecological community.

    Science.gov (United States)

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  7. Interiors Construction Manual integrated planning, finishing and fitting out, technical servcies

    CERN Document Server

    Hausladen, Gerhard

    2010-01-01

    Soccer stadiums, airports, theaters, museums it falls to very few architects to tackle spectacular building tasks like these. The everyday work of most architects is more often focused on ""manageable"" projects like the renovation, remodeling, or rebuilding of single- and multi-family houses, schools, and offices. Whatever the nature of the building task, interior construction is always a significant design and qualitative challenge that calls for highly detailed technical expertise. After all, it affects the realm that will be brought to life and utilized by the user when the task is finished, and whose aesthetic and functional serviceability will be put to the test each and every day. The Interior Construction Manual supports planners in their daily work as a practical planning aid and reference work with the relevant standards, guidelines, reference details, and constructional solutions, all illustrated by built example projects. It brings together the crucial facts on all aspects of interior construction...

  8. Construction principles and design rules in the case of circular design

    NARCIS (Netherlands)

    Romme, A.G.L.; Endenburg, G.

    2006-01-01

    This paper proposes science-based organization design that uses construction principles and design rules to guide practitioner-academic projects. Organization science implies construction principles for creating and implementing designs. These principles serve to construct design rules that are

  9. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  10. Construction of a remote radiotherapy planning system

    International Nuclear Information System (INIS)

    Ogawa, Yoshihiro; Nemoto, Kenji; Takahashi, Chiaki; Takai, Yoshihiro; Yamada, Shogo; Seiji, Hiromasa; Sasaki, Kazuya

    2005-01-01

    We constructed a remote radiotherapy planning system, and we examined the usefulness of and faults in our system in this study. Two identical radiotherapy planning systems, one installed at our institution and the other installed at an affiliated hospital, were used for radiotherapy planning. The two systems were connected by a wide area network (WAN), using a leased line. Beam data for the linear accelerator at the affiliated hospital were installed in the two systems. During the period from December 2001 to December 2002, 43 remote radiotherapy plans were made using this system. Data were transmitted using a file transfer protocol (FTP) software program. The 43 radiotherapy plans examined in this study consisted of 13 ordinary radiotherapy plans, 28 radiotherapy plans sent to provide assistance for medical residents, and 2 radiotherapy plans for emergency cases. There were ten minor planning changes made in radiotherapy plans sent to provide assistance for medical residents. Our remote radiotherapy planning system based on WAN using a leased line is useful for remote radiotherapy, with advantages for both radiation oncologists and medical residents. (author)

  11. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  12. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  13. Mitigating construction safety risks using prevention through design.

    Science.gov (United States)

    Gangolells, Marta; Casals, Miquel; Forcada, Núria; Roca, Xavier; Fuertes, Alba

    2010-04-01

    Research and practice have demonstrated that decisions made prior to work at construction sites can influence construction worker safety. However, it has also been argued that most architects and design engineers possess neither the knowledge of construction safety nor the knowledge of construction processes necessary to effectively perform Construction Hazards Prevention through Design (CHPtD). This paper introduces a quantitative methodology that supports designers by providing a way to evaluate the safety-related performance of residential construction designs using a risk analysis-based approach. The methodology compares the overall safety risk level of various construction designs and ranks the significance of the various safety risks of each of these designs. The methodology also compares the absolute importance of a particular safety risk in various construction designs. Because the methodology identifies the relevance of each safety risk at a particular site prior to the construction stage, significant risks are highlighted in advance. Thus, a range of measures for mitigating safety risks can then be implemented during on-site construction. The methodology is specially worthwhile for designers, who can compare construction techniques and systems during the design phase and determine the corresponding level of safety risk without their creative talents being restricted. By using this methodology, construction companies can improve their on-site safety performance. Copyright 2010 Elsevier Ltd. All rights reserved.

  14. Sustainable Design and Construction of the Fernald Preserve Visitors Center

    International Nuclear Information System (INIS)

    Powell, J.; Sizemore, M.; Cornils, K.

    2009-01-01

    In September 2008, the Fernald Preserve Visitors Center was awarded the platinum certification level by the US Green Building Council (USGBC), the highest level achievable under the Leadership in Energy and Environmental Design New Construction and Major Renovations (LEED-NC) rating system. The Visitors Center, which is maintained and operated under the direction of the U.S. Department of Energy (DOE) Office of Legacy Management, is the first building in Ohio, the second DOE building and one of approximately 100 buildings worldwide to achieve platinum certification. As a sustainable building, the Visitors Center includes a ground source heat pump, a bio-treatment wetland system, recycled construction materials, native and no-irrigation plants and numerous other components to reduce energy, electricity, and water consumption and to lessen the building's impact on the environment. The building's conceptual design was originally developed by the University of Cincinnati's College of Design, Architecture, Art and Planning (DAAP), with input from the community, and the building was designed and built by the Megen Construction Company-glaserworks team, under the direction of S.M. Stoller, Corporation, the Legacy Management contractor for the Fernald Preserve and the DOE Office of Legacy Management. The project required a committed effort by all members of the project team. This is the first sustainable building constructed as part of the cleanup of the environmental legacy of the Cold War. The Visitors Center's exhibits, reading room, and programs will help to educate the community about the Fernald Preserve's environmental legacy and show how our decisions affect the environment. (authors)

  15. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    1987-01-01

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  16. Workspace experiments: a journey on planning participatory design

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole

    2017-01-01

    Summative Statement: This paper presents a resource material in planning and performing participatory workspace design processes. This material brings up design dialogues into focus and gives insights on how to stage them, bridging the gap of merging user involvement with the well-defined design...... work-practice. Problem statement: There is a widespread interest in implementing user involvement in major building and construction projects. Nevertheless, it is also often difficult to translate the contributions from users to workspace design that seriously take on board the employees’ specific work...... practices as a platform for a desired change. There is a need of tool that manages to travel into a well-defined design work-practice and merge with it. Research Objective: We developed a resource material to merge user involvement within current designers’ practices when designing new workspaces. The aim...

  17. BUSINESS PLANS INFORMED BY DESIGN

    DEFF Research Database (Denmark)

    Petersen, Sørren Ingomar; Heebøll, John

    2011-01-01

    Today the value created by applying design at a business model and innovation level as opposed to a design and process level is marginal. Interviews with product developers from academia and industry suggest this is due to a lack of design perspective when formulating and evaluating business plans...... types. These were the design of products based on sustainable and on disruptive technologies. In conclusion, we recommend a procedure to align and translate business plan content into inspirational design briefs for enhancing design concept synthesis performance........ To remedy this, we propose including Design Quality Criteria drivers in the formulation of business plans. While auditing entrepreneurial business plans and design briefs content gaps were revealed between them. Strategy and context differences as well as a negative correlation between investors’ business...

  18. Nuclear waste repository design and construction

    International Nuclear Information System (INIS)

    Bohlke, B.M.; Monsees, J.E.

    1987-01-01

    Extensive underground excavation will be required for construction of a mined geologic repository for nuclear waste. Hundreds of thousands of feet of drift will be required based on the conceptual layout design for each candidate nuclear waste repository. Comparison of boring and blasting excavation methods are discussed, as are special design and construction requirements (e.g., quality assurance procedures and performance assessment) for the nuclear waste repository. Comparisons are made between boring and blasting construction methods for the repository designs proposed for salt, volcanic tuff, and basalt

  19. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts....... It can be argued that design to target cost may also provide a frame for developing the supply chain towards better coordination and collaboration. Thus methods of design to target cost may serve to facilitate the development of a more integrated supply chain....

  20. 4D modeling in high-rise construction

    Science.gov (United States)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  1. Initial research on planning and design of today's Buddhist temple

    Institute of Scientific and Technical Information of China (English)

    Xinjian LI; Guangya ZHU

    2008-01-01

    Starting from the reconstruction planning for the Chongyuan Temple in Suzhou Industrial Park, the planners explored the elements of contemporary Buddhism architecture planning and design in terms of the social multi-requirement, environmental utilization fitted for a given time and place, appropriate temple pat-tern on specification and institution, functional division for harmonic relationship between monks and laymen, etc. For realization of historic mission: carrying forward the cultural tradition and constructing harmonic society, this paper proposes some principles of creation, which have historical evidence and are keeping pace with the times.

  2. Disposal of spent fuel in Olkiluoto bedrock. Programme for research, development and technical design for the pre-construction phase

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The spent fuel from the nuclear power plants at Olkiluoto and Loviisa will be disposed of in Finnish bedrock. Posiva aims at starting the construction of the disposal facility in the 2010's and the actual disposal operations in 2020. In May 1999 Posiva submitted an application for the so-called Decision-in-Principle (DiP) on the facility to the Finnish Government. According to the application the repository would be based on a KBS-3 type concept and sited at Olkiluoto. The application was approved by the Government in December 2000 and will go next to the Parliament for final approval. However, Posiva has already started the planning for the next programme phase on the assumption that a positive decision will be made. The purpose of the present document is to describe the objectives and major items of research, development, technical planning and design work for the period preceding the construction license. According to the current official guidelines Posiva should prepare for submitting the application for the license in 2010. For the technical development and design work the main target for the starting programme phase is to reach the maturity of design and technical plans that allows the specification of work packages for bid calls and gives sufficient confidence in the technical feasibility of planned operations at the encapsulation facility and in the repository. The main objectives for the complementary characterisation work at Olkiluoto consist of the verification of the present conclusions on site suitability, the definition and identification of suitable rock volumes for repository space and the characterisation of the target host rock for repository design, safety assessment and planning of construction work. The technical design and demonstration work together with the results of complementary site characterisation will provide the basis of the safety case prepared as the support for the construction license application. An integrated safety

  3. Disposal of spent fuel in Olkiluoto bedrock. Programme for research, development and technical design for the pre-construction phase

    International Nuclear Information System (INIS)

    2000-12-01

    The spent fuel from the nuclear power plants at Olkiluoto and Loviisa will be disposed of in Finnish bedrock. Posiva aims at starting the construction of the disposal facility in the 2010's and the actual disposal operations in 2020. In May 1999 Posiva submitted an application for the so-called Decision-in-Principle (DiP) on the facility to the Finnish Government. According to the application the repository would be based on a KBS-3 type concept and sited at Olkiluoto. The application was approved by the Government in December 2000 and will go next to the Parliament for final approval. However, Posiva has already started the planning for the next programme phase on the assumption that a positive decision will be made. The purpose of the present document is to describe the objectives and major items of research, development, technical planning and design work for the period preceding the construction license. According to the current official guidelines Posiva should prepare for submitting the application for the license in 2010. For the technical development and design work the main target for the starting programme phase is to reach the maturity of design and technical plans that allows the specification of work packages for bid calls and gives sufficient confidence in the technical feasibility of planned operations at the encapsulation facility and in the repository. The main objectives for the complementary characterisation work at Olkiluoto consist of the verification of the present conclusions on site suitability, the definition and identification of suitable rock volumes for repository space and the characterisation of the target host rock for repository design, safety assessment and planning of construction work. The technical design and demonstration work together with the results of complementary site characterisation will provide the basis of the safety case prepared as the support for the construction license application. An integrated safety assessment

  4. Fuzzy sets on step of planning of experiment for organization and management of construction processes

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy

    2016-01-01

    Full Text Available In this article, problems of mathematical modeling and experiment planning of the organization and management of construction. The authors designated the basic restrictions and the difficulties in this field. Concluded that the planning of research experiment is possible in the information sphere with using of heuristic, graphical, mathematical models, as well as neural networks and genetic algorithms. The authors note the need for use of expert information in the case of the formalization of quality parameters. The article presented an overview of the translation methods of qualitative information into mathematical language. Comparison of methods the qualimetry of USSR scientists, the analytic hierarchy process and fuzzy set theory were performed. The benefits of the latter for interpretation of qualitative parameters were identified. The authors have given many examples of application fuzzy sets for formalization of organizational factors of construction processes. Finally, there conclusion was made about progressiveness and effectiveness of fuzzy set theory to describe the qualitative parameters of organization and management of construction.

  5. Optimization planning for the construction of the U.S. EPR

    International Nuclear Information System (INIS)

    Phillips, M. K.

    2008-01-01

    As utilities and project developers in the United States embark on a new nuclear plant construction endeavor, the industry must have the confidence and support of all stakeholders. To gain this confidence and support, cost and schedule certainty must be established. Therein lies the challenge. The owner will insist that constructors and suppliers deliver new plants on time and within project budgets. This will be a significant effort given the limited number of qualified equipment and commodity suppliers, and a shortage of experienced craft and supervision. In an effort to manage construction risk and ensure cost and schedule certainty, the AREVA Construction Management Team has lead the development of a construction strategy that includes advanced construction methods and technologies such as 3-D modeling, detailed planning and scheduling, open-top construction, state-of-the-art fabrication practices, specialty transportation and lifting methods, and pre-assembly and modularization, otherwise referred to as construction optimization. Unlike off-shore platforms, industrial process plants, and ships where piping and components can be integrated into the steel building structure, optimized construction of nuclear plants must consider reinforced concrete walls and slabs that serve as the building structure, and provide radiation shielding and containment of nuclear systems. These differences in design and construction require a significantly different analysis approach that is focused on rooms of a building rather than the whole building or plant. This paper will focus on the process developed and currently being implemented by the U.S. EPR (Evolutionary Power Reactor) Construction Team to identify opportunities for optimization and then to evaluate and select the rooms or areas of the plant where pre-assembly or modularization will provide the greatest benefit to construction cost and schedule certainty. Key measures for comparison and selection are critical path

  6. The management of design interfaces in the nuclear power construction

    International Nuclear Information System (INIS)

    Lv Shubao

    2005-01-01

    This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)

  7. Design of a Construction Safety Training System using Contextual Design Methodology

    OpenAIRE

    Baldev, Darshan H.

    2006-01-01

    In the U.S., the majority of construction companies are small companies with 10 or fewer employees (BLS, 2004). The fatality rate in the construction industry is high, indicating a need for implementing safety training to a greater extent. This research addresses two main goals: to make recommendations and design a safety training system for small construction companies, and to use Contextual Design to design the training system. Contextual Design was developed by Holtzblatt (Beyer and Holtzb...

  8. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  9. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  10. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  11. 4D modeling in high-rise construction

    Directory of Open Access Journals (Sweden)

    Balakina Anastasiya

    2018-01-01

    Full Text Available High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  12. The Role of Hypothesis in Constructive Design Research

    DEFF Research Database (Denmark)

    Bang, Anne Louise; Krogh, Peter; Ludvigsen, Martin

    2012-01-01

    It is, today, widely appreciated that Research-through-Design – or Constructive Design Research as we will call it in this paper – allows for designers to produce knowledge based on the skills and capacities of the design field itself. However, most of the research fails to bridge the gap between...... the general notions of constructive design research and the detailed research activities of the field. We therefore suggest bridging this methodological gap in the academic discussion with what we have ended up calling the “entrance level of constructive design research”. As a step towards to a more nuanced...... and solid perspective on how to keep constructive design research on track, this paper offers a model for understanding the role of hypothesis in constructive design research. The model allows for understanding the hypothesis’s relation to research motivation, questions, experiments, evaluation...

  13. Car Builder: Design, Construct and Test Your Own Cars. School Version with Lesson Plans. [CD-ROM].

    Science.gov (United States)

    Highsmith, Joni Bitman

    Car Builder is a scientific CD-ROM-based simulation program that lets students design, construct, modify, test, and compare their own cars. Students can design sedans, four-wheel-drive vehicles, vans, sport cars, and hot rods. They may select for aerodynamics, power, and racing ability, or economic and fuel efficiency. It is a program that teaches…

  14. Contingency planning and emergency response in construction activities: Training the construction worker

    International Nuclear Information System (INIS)

    Jones, E.

    1987-01-01

    Construction activities have the potential for environmental and/or health impacts at Oak Ridge National Laboratory (ORNL) particularly as site cleanup and restoration plans are initiated. ORNL has instituted special training for all construction workers and related contractors. Individuals learn how construction activities at ORNL can potentially have adverse effects on the environment and their health, and to learn how to respond to potential chemical and radiation hazards. Workers are given a review of basic information on radiation and chemicals in a framework that emphasizes the situations in which workers or the environment may be exposed to potential risk. Specific instructions are presented on what to do when contamination is suspected, with identification of emergency procedures and response personnel. 5 refs., 1 fig

  15. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  16. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  17. A review of the design, construction and development of the PUSPATI project

    International Nuclear Information System (INIS)

    Ahmad Tajuddin Ali.

    1983-01-01

    The setting up of the Tun Ismail Atomic Research Centre (PUSPATI) was decided upon in September 1972 and soon after, plans were underway for the purchase of a research reactor and the construction of a research centre to house it. The centre was originally planned to be located at Sungai Buloh about 20 km to the north-west of Kuala Lumpur. However, in September 1978, a decision was made to locate the centre at Bangi, about 32 km to south of Kuala Lumpur. Earth work was started in January 1979 with clearing of the forest at the proposed site. Building construction started in February 1980. By September 1981, the reactor building was practically completed and enable reactor construction to begin. This was finished on July 15, 1982 when the reactor was officially handed over to PUSPATI. Work on the rest of the complex fell behind schedule and was only completed in July 1983 when PUSPATI moved in to occupy the research laboratories. The implementation of the PUSPATI project has been completed not without its share of problems. Its completion also marks the beginning of a new era for the development of nuclear science and technology in this country. This paper reviews the design, construction and development of the entire project. (author)

  18. Enterprise resource planning in construction: An evaluation of recent implementations

    NARCIS (Netherlands)

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  19. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  20. Nuclear power plant equipment design and construction rules

    International Nuclear Information System (INIS)

    Boiron, P.

    1983-03-01

    Presentation of the AFCEN (French association for nuclear power plant equipment design and construction rules) working, of its edition activity and of somes of its edited documents such as RCC-C (design and construction rules for PWR power plant fuel assemblies) and RCC-E (design and construction rules for nuclear facility electrical equipments) [fr

  1. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  2. Designing Users : The Social Construction of Users in Product Design

    OpenAIRE

    Kadanoff, David Bradley

    2014-01-01

    The technological systems in our society are widespread and structured in complex ways. To comprehend the construction of these systems, it is necessary to understand who has opportunities to influence them and how. Previous scholarship in the sociology of technology has provided some analysis of the roles of designers and users in constructing technology. However, this research tends to oversimplify the nature of design work and portrays designers and users in isolation, having little- to-no...

  3. Sustainable green inner-wall design for flexible floor plan

    International Nuclear Information System (INIS)

    Tawil, N M; Husaini, H A; Ani, A I; Saleh, R M; Basri, H

    2013-01-01

    The rises of house price in the market is so drastic that it effects the younger generation nowadays especially young executives and young couples who could not afford to buy their first home. The factors that determine the house price presumably are the interior and exterior structural of the house itself. So to lessen the house price, we have to minimize the usage of wet construction thus the idea of having a sustainable green inner-wall implemented into the house with a flexible floor plan. This concept is user-friendly as it is built on needs and the ownership's affordability. They can design the interior of the house however they want with using minimal cost because it does not involve wet construction.

  4. Gene composer: database software for protein construct design, codon engineering, and gene synthesis.

    Science.gov (United States)

    Lorimer, Don; Raymond, Amy; Walchli, John; Mixon, Mark; Barrow, Adrienne; Wallace, Ellen; Grice, Rena; Burgin, Alex; Stewart, Lance

    2009-04-21

    To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene assembly procedure with mis-match specific endonuclease

  5. Gene Composer: database software for protein construct design, codon engineering, and gene synthesis

    Directory of Open Access Journals (Sweden)

    Mixon Mark

    2009-04-01

    Full Text Available Abstract Background To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. Results An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. Conclusion We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene

  6. Study on mid and long-term strategic plan formulation for newly-constructed NPP

    International Nuclear Information System (INIS)

    Song Lin

    2014-01-01

    Mid and Long-term strategic plan plays a key role for the management of a newly constructed nuclear power company. Among others, process, goals, and risk management, are the primary concerns during plan preparing. The article analyzed these three areas for Fuqing NPP, including the formulating process for the plan, the mid and long-term goal setting of the company, the major risk analysis and countermeasure selection therefore. Through that solutions and suggestions for strategic plan formulation were concluded for newly-constructed NPP. (author)

  7. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  8. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    Science.gov (United States)

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  9. Planning and design of information systems

    CERN Document Server

    Blokdijk, André

    1991-01-01

    Planning and Design of Information Systems provides a theoretical base and a practical method of executing the planning of computerized information systems, and the planning and design of individual applications. The book is organized into five parts, covering the non-technical and nonimplementational part of information systems planning, design, and development. Part I gives the theoretical base for the subsequent parts of the book. It discusses modeling, techniques, notations, boundaries, quality issues and aspects, and decomposition techniques and problems. Part II discusses the needs, prob

  10. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  11. Planning and Design: A Systems Approach.

    Science.gov (United States)

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  12. Design in the planning arena : how regional designing influences strategic spatial planning

    NARCIS (Netherlands)

    Kempenaar, Annet

    2017-01-01

    Regional designing is a form of spatial design that engages with the future physical form and arrangement of regions, including its aesthetic appearances and how it can come about. As such it is closely entangled with spatial planning. This thesis studies the influence of regional designing on

  13. Study on environmental impact assessment index system of uranium production base construction plan

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    The index system on planning environmental impact assessment of uranium mining base construction is discussed by using the hiberarchy method according to characteristics of uranium production and environmental protection object of planning assessment. The suggested index system is in favor of persistent exploitation of uranium resource and environmental protection in the uranium mining area, and can provide a reference for planning environmental impact assessment of uranium mining base construction in China. (authors)

  14. Building for a Changing Climate - Adaptation through planning and construction

    Energy Technology Data Exchange (ETDEWEB)

    2009-08-15

    Adaptation through planning and construction can help to reduce the negative effects of climate change, such as flooding, landslides, landslips, and erosion. The National Board of Housing, Building and Planning (Boverket) has conducted an analysis of how the Planning and Building Act can assist in the work towards climate change adaptation. This brochure provides guidance and support to for example property owners, developers, officials and decision makers in municipalities and the state

  15. Managing Client Values in Construction Design

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2008-01-01

    In construction projects the client will comprise both owner, end-users, and the wider society, representatives of which may have conflicting goals and values; and these may not be fully realized by the stakeholders themselves. Therefore it is a great challenge to capture and manage the values...... for capturing and managing client values within a lean framework. This paper describes the initial findings of a joint research project between academia and industry practitioners that seeks to develop the workshop method to create a state of the art approach in construction design management. This includes...... of the multiple stakeholders that constitutes the “client”. However, seeing client satisfaction as the end-goal of construction it is imperative to make client values explicit in the early project phase and make sure that these values are reflected in all subsequent phases of design and construction...

  16. Drug plan design incentives among Medicare prescription drug plans.

    Science.gov (United States)

    Huskamp, Haiden A; Keating, Nancy L; Dalton, Jesse B; Chernew, Michael E; Newhouse, Joseph P

    2014-07-01

    Medicare Advantage prescription drug plans (MA-PDs) and standalone prescription drug plans (PDPs) face different incentives for plan design resulting from the scope of covered benefits (only outpatient drugs for PDPs versus all drug and nondrug services for Medicare Advantage [MA]/MA-PDs). The objective is to begin to explore how MA-PDs and PDPs may be responding to their different incentives related to benefit design. We compared 2012 PDP and MA-PD average formulary coverage, prior authorization (PA) or step therapy use, and copayment requirements for drugs in 6 classes used commonly among Medicare beneficiaries. We primarily used 2012 Prescription Drug Plan Formulary and Pharmacy Network Files and MA enrollment data. 2011 Truven Health MarketScan claims were used to estimate drug prices and to compute drug market share. Average coverage and PA/step rates, and average copayment requirements, were weighted by plan enrollment and drug market share. MA-PDs are generally more likely to cover and less likely to require PA/step for brand name drugs with generic alternatives than PDPs, and MA-PDs often have lower copayment requirements for these drugs. For brands without generics, we generally found no differences in average rates of coverage or PA/step, but MA-PDs were more likely to cover all brands without generics in a class. We found modest, confirmatory evidence suggesting that PDPs and MA-PDs respond to different incentives for plan design. Future research is needed to understand the factors that influence Medicare drug plan design decisions.

  17. Construction plan of ion irradiation facility in JAERI

    International Nuclear Information System (INIS)

    Tanaka, Ryuichi

    1987-01-01

    The Takasaki Radiation Chemistry Research Establishment of Japan Atomic Energy Research Institute (JAERI) started the construction of an ion irradiation facility to apply ion beam to the research and development of radiation resistant materials for severe environment, the research on biotechnology and new functional materials. This project was planned as ion beam irradiation becomes an effective means for the research on fundamental physics and advanced technology, and the national guideline recently emphasizes the basic and pioneering field in research and development. This facility comprises an AVF cyclotron with an ECR ion source (maximum proton energy: 90 MeV), a 3 MV tandem accelerator, a 3 MV single end type Van de Graaf accelerator and a 400 kV ion implanter. In this report, the present status of planning the accelerators and the facility to be constructed, the outline of research plan, the features of the accelerators, and the beam characteristics are described. In this project, the research items are divided into the materials for space environment, the materials for nuclear fusion reactors, biotechnology, new functional materials, and ion beam technology. The ion beams required for the facility are microbeam, pulsed beam, multiple beam, neutron beam and an expanded irradiation field. (Kako, I.)

  18. Constructional project planning and atomic energy law - the Wackersdorf reprocessing plant as an example

    International Nuclear Information System (INIS)

    Hofmann, J.

    1989-01-01

    The article discusses a provisional order issued by the 22nd senate of the Munich Higher Administrative Court on December 19, 1985 in accordance with section 47 VII VwGO (Rules of Administrative Courts), and a decision by the same senate on a voidance petition, taken on January 29, 1988, which however is not final due to a notice of appeal. The problematic items discussed include the consideration of interests not specific to constructional planning in the planning procedure according to construction planning laws, the significance of the amendment of 1976 of the Federal Building Act, the obligation to settle conflicts, the definition of scope and limits of this obligation, as well as the planning-related requirements set by the construction planning law fo nuclear installations. (RST) [de

  19. Advanced customization in architectural design and construction

    CERN Document Server

    Naboni, Roberto

    2015-01-01

    This book presents the state of the art in advanced customization within the sector of architectural design and construction, explaining important new technologies that are boosting design, product and process innovation and identifying the challenges to be confronted as we move toward a mass customization construction industry. Advanced machinery and software integration are discussed, as well as an overview of the manufacturing techniques offered through digital methods that are acquiring particular significance within the field of digital architecture. CNC machining, Robotic Fabrication, and Additive Manufacturing processes are all clearly explained, highlighting their ability to produce personalized architectural forms and unique construction components. Cutting-edge case studies in digitally fabricated architectural realizations are described and, looking towards the future, a new model of 100% customized architecture for design and construction is presented. The book is an excellent guide to the profoun...

  20. 46 CFR 58.05-1 - Material, design and construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Material, design and construction. 58.05-1 Section 58.05... AUXILIARY MACHINERY AND RELATED SYSTEMS Main Propulsion Machinery § 58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery...

  1. 42 CFR 137.365 - What is the procedure for the Secretary's review and approval of project planning and design...

    Science.gov (United States)

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...

  2. Designing and constructing/installing technical security countermeasures (TSCM) into supersensitive facilities

    International Nuclear Information System (INIS)

    Davis, D.L.

    1988-01-01

    The design and construction of supersensitive facilities and the installation of systems secure from technical surveillance and sabotage penetration involve ''TSCM'' in the broad sense of technical ''security'' countermeasures. When the technical threat was at a lower level of intensity and sophistication, it was common practice to defer TSCM to the future facility occupant. However, the New Moscow Embassy experience has proven this course of action subject to peril. Although primary concern with the embassy was audio surveillance, elsewhere there are other threats of equal or greater concern, e.g., technical implants may be used to monitor readiness status or interfere with the operation of C3I and weapons systems. Present and future technical penetration threats stretch the imagination. The Soviets have committed substantial hard scientific resources to a broad range of technical intelligence, even including applications or parapsychology. Countering these threats involves continuous TSCM precautions from initial planning to completion. Designs and construction/installation techniques must facilitate technical inspections and preclude the broadest range of known and suspected technical penetration efforts

  3. Designing and constructing/installing technical security countermeasures (TSCM) into supersensitive facilities

    Energy Technology Data Exchange (ETDEWEB)

    Davis, D.L.

    1988-01-01

    The design and construction of supersensitive facilities and the installation of systems secure from technical surveillance and sabotage penetration involve ''TSCM'' in the broad sense of technical ''security'' countermeasures. When the technical threat was at a lower level of intensity and sophistication, it was common practice to defer TSCM to the future facility occupant. However, the New Moscow Embassy experience has proven this course of action subject to peril. Although primary concern with the embassy was audio surveillance, elsewhere there are other threats of equal or greater concern, e.g., technical implants may be used to monitor readiness status or interfere with the operation of C3I and weapons systems. Present and future technical penetration threats stretch the imagination. The Soviets have committed substantial hard scientific resources to a broad range of technical intelligence, even including applications or parapsychology. Countering these threats involves continuous TSCM precautions from initial planning to completion. Designs and construction/installation techniques must facilitate technical inspections and preclude the broadest range of known and suspected technical penetration efforts.

  4. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  5. Planning linear construction projects: automated method for the generation of earthwork activities

    NARCIS (Netherlands)

    Askew, W.H.; Al-Jibouri, Saad H.S.; Mawdesley, M.J.; Patterson, D.E.

    2002-01-01

    Earthworks planning for road construction projects is a complex operation and the planning rules used are usually intuitive and not well defined. An approach to automate the earthworks planning process is described and the basic techniques that are used are outlined. A computer-based system has been

  6. Construction technique for a chemical plant (I)

    International Nuclear Information System (INIS)

    1978-08-01

    This book mentions the order of plant construction, building plant and related regulations, basic engineering design data, provide of equipment, plan and management on building plant, quality control, the budget and contract for building plant, public works for building chemical plant like road construction, basic plan and building for a chemical plant, introduction and principle on foundation improvement method, including pile foundation and design for footing, construction and installation for a chemical plant and a rotary machine for a chemical plant.

  7. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  8. Design, designer and designer’s liability in construction procurement routes

    OpenAIRE

    Akbiyikli, Rifat; Onur Ugur, Latif; Ateş, Ali; Polat, Hakan

    2016-01-01

    In construction projects, the question of who bears the risk and responsibility for the design of the project is often a source of dispute between the project owner, on the one hand, and the architect/engineer or the contractor/subcontractor(s), on the other hand. All parties to a construction project should ensure they have read and understood their design responsibilities pursuant to the terms of their contracts. Most importantly, parties should ensure that the contracts explicitly reflect ...

  9. Handbook for the design, selection, and construction of a rock cover for retired uranium-mill tailings

    International Nuclear Information System (INIS)

    Parker, G.B.

    1982-09-01

    As part of a Nuclear Regulatory Commission (NRC) study to assess the long-term protection of retired uranium mill tailings, the Pacific Northwest Laboratory (PNL) is developing a Handbook to guide the design, selection, and construction of a rock cover (riprap) for decommissioned and reclaimed uranium-mill tailings. The rock cover is designed for long-term protection of mill tailings from wind and water erosion. The purpose of the Handbook is twofold. First, it can be used as a manual by the uranium mill operators for designing, selecting, and constructing a rock cover. Second, the Handbook can be used as a guide to help the NRC evaluate the decommissioning and reclamation plans submitted to them by mill operators. Although the Handbook is not site-specific, it is structured to allow the design of a rock cover for any NRC-licensed tailings impoundment

  10. The implementation of the integrated design process in the hole-plan system

    Directory of Open Access Journals (Sweden)

    Won-Sun Ruy

    2012-12-01

    Full Text Available All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  11. Architects' perspectives on construction waste reduction by design.

    Science.gov (United States)

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  12. Architects' perspectives on construction waste reduction by design

    International Nuclear Information System (INIS)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process

  13. Augmented reality for improved communication of construction and maintenance plans in nuclear power plants

    International Nuclear Information System (INIS)

    Sorensen, Soren S.

    2010-01-01

    The purpose of implementing Augmented Reality, AR, in the planning, construction and maintenance of Nuclear Power Plants is to secure strict control, precise and correct constructions, exact execution of assignments and heightened safety at all levels. Communication of construction plans to ensure precise and correct assembly of structural elements is essential in all building projects. This is especially crucial in the construction of nuclear plants and installation of new components. The current ways in which construction plans are communicated, blueprints, 3D digital models and written descriptions all embody the need for significant levels of abstraction and interpretation, and are thus both difficult to understand and can lead to misinterpretations. A simulation system with full scale three dimensional models experienced in the physical setting where operations are to take place would bring operators closer to the real life assignments. Augmented Reality is a visualization technology that provides this motivation. (author)

  14. Problems of development and ecological construction in terms of design and construction activities in the Volgograd region

    OpenAIRE

    Taranova Anna Valer'evna; Borisova Natal'ja Ivanovna

    2016-01-01

    The analysis of existing problems and the further development of ecological construction in the Volgograd region. Discusses the problem of socio-environmental plan in terms of project construction activities. The necessity of identifying the sources of negative impact on the construction of residential properties, define solutions for their further elimination, the authors show the necessity of using environmental innovation techniques in modern construction industry.

  15. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  16. Countermeasures for China’s Ecological Environment Construction in Land Reclamation

    Institute of Scientific and Technical Information of China (English)

    Chen; LI; Xinfeng; LIU; Zhe; PENG; Tao; SI; Lingfeng; KONG

    2013-01-01

    Basic situation of the current ecological environment construction in land consolidation and rehabilitation of China is introduced. The related advanced experience abroad is summarized from mainly four aspects, namely policy, system as well as subject development, planning guidance, design method of project planning and engineering study, and practical countermeasures to China’s ecological environment construction in land reclamation are proposed. In terms of policy, system and subject, relevant regulations, policies and system construction should be strengthened and the framework of policy, system and subject development in ecological landscape construction of China’s land reclamation should be proposed, integrating ecological environment construction into land reclamation. At the level of strategic planning, the spatial layout and construction key points of green infrastructure in land reclamation of "urban multi-functional developing region, eastern economic developed region, central modern agricultural region and northwestern ecological fragile region" should be achieved. At the level of project planning design, ecological principles, sustainable landscape design principles and vernacular landscape design methods are to be integrated into the planning procedure to form operable technique regulations or introductions. At the level of engineering design, engineering technique system, standards and regulations of ditches, roads, forests and channels with local distinctions should be formulated according to the characters and strategic demands of urbanization, industrialization, agriculture modernization and ecological environment preservation in different regions.

  17. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  18. The Role of Hypothesis in Constructive Design Research

    OpenAIRE

    Bang, Anne Louise; Krogh, Peter; Ludvigsen, Martin; Markussen, Thomas

    2012-01-01

    It is, today, widely appreciated that Research-through-Design – or Constructive Design Research as we will call it in this paper – allows for designers to produce knowledge based on the skills and capacities of the design field itself.However, most of the research fails to bridge the gap between the general notions of constructive design research and the detailed research activities of the field. We therefore suggest bridging this methodological gap in the academic discussion with what we hav...

  19. Facility design, construction, and operation

    International Nuclear Information System (INIS)

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l'Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l'Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec's contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides' all of the basic information in these areas and reflects actual experience to date

  20. Constructal Law and the Unifying Principle of Design

    CERN Document Server

    Lorente, Sylvie; Bejan, Adrian

    2013-01-01

    Design happens everywhere, whether in animate objects (e.g., dendritic lung structures, bacterial colonies, and corals), inanimate patterns (river basins, beach slope, and dendritic crystals), social dynamics (pedestrian traffic flows), or engineered systems (heat dissipation in electronic circuitry). This “design in nature” often takes on remarkably similar patterns, which can be explained under one unifying Constructal Law. This book explores the unifying power of the Constructal Law and its applications in all domains of design generation and evolution, ranging from biology and geophysics to globalization, energy, sustainability, and security.  The Constructal Law accounts for the universal tendency of flow systems to morph into evolving configurations that provide greater and easier access over time. The Constructal Law resolves the many and contradictory ad hoc statements of “optimality”, end design, and destiny in nature, such as minimum and maximum entropy production and minimum and maximum fl...

  1. Perception of Construction Participants in Construction delays: A case study in Tamilnadu, India.

    Science.gov (United States)

    Rathinakumar, V.; Vignesh, T.; Dhivagar, K.

    2017-07-01

    Delays in the construction industry are universal fact, which affects the construction participants. The research work spotlights on determining the prevailing delays in the cities of Tamil Nadu, as perceived by the participants. After a few field level interactions, a questionnaire was framed and administered to the participants i.e., Consultants (50 Nos.), contractors (50 Nos.) and clients (150 Nos.) to understand their perception on the causes of delays. The factors for delay was categorized into 4 groups say Improper project planning, Design related issues, Finance related issues and Resource related issues. The responses were analysed using the SPSS software by applying ANOVA and Regression analysis. From the analysis, it was found that the personal financial problems of the client dominantly affect the entire construction progress and the subsequent design changes by the clients, Inadequate early project planning, labour related issues. Also, the delay groups were found to be the improper project planning and the Resource related issues.

  2. Proposal for elicitation and analysis of environmental requirements into the construction design process: a case study

    Directory of Open Access Journals (Sweden)

    Camila Pegoraro

    2010-05-01

    Full Text Available Proposal: As new demands from sustainable development, environmental requirements arise as another challenge to design process management. It is already known that companies which design buildings are usually exposed to many managerial difficulties. Faced to the environmental demands, these companies require new facilities to align environmental requirements to the business goals and to include them properly in design process. This paper is based on a case study in a construction company, which was developed through interviews and document analysis. It is intended to present a procedure for the project environmental requirements elicitation, organization and analysis, which is based on the requirements engineering (ER concepts. As results it was concluded that the ER concepts are useful for the environmental requirements integration into the design process and that strategic planning should give directions for the effective environmental requirements adherence. Moreover, a procedure for environmental requirements modeling is proposed. Key-words: Design process, Requirements management, Environmental requirements, Construction

  3. The influence of architectural designers on construction ergonomics ...

    African Journals Online (AJOL)

    , the construction process generates a disproportionate number of fatalities, injuries and disease and both the direct and indirect costs contribute to the cumulative cost of construction. Designers influence construction ergonomics directly and ...

  4. Mass of materials: the impact of designers on construction ergonomics.

    Science.gov (United States)

    Smallwood, John

    2012-01-01

    Many construction injuries are musculoskeletal related in the form of sprains and strains arising from the handling of materials, which are specified by designers. The paper presents the results of a study conducted among delegates attending two 'designing for H&S' (DfH&S) seminars using a questionnaire. The salient findings include: the level of knowledge relative to the mass and density of materials is limited; designers generally do not consider the mass and density of materials when designing structures and elements and specifying materials; to a degree designers appreciate that the mass and density of materials impact on construction ergonomics; designers rate their knowledge of the mass and density of materials as limited, and designers appreciate the potential of the consideration of the mass and density of materials to contribute to an improvement in construction ergonomics. Conclusions include: designers lack the requisite knowledge relative to the mass and density of materials; designers are thus precluded from conducting optimum design hazard identification and risk assessments, and tertiary built environment designer education does not enlighten designers relative to construction ergonomics. Recommendations include: tertiary built environment designer education should construction ergonomics; professional associations should raise the level of awareness relative to construction ergonomics, and design practices should include a category 'mass and density of materials' in their practice libraries.

  5. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Science.gov (United States)

    2010-10-01

    ... crewmembers and scientific personnel. (i) Magazines and magazine vans. (1) All plans relating to the arrangement, construction, ventilation, and fire protection system for magazines and magazine vans. (The plans... liferafts and buoyant apparatus. (h) Accommodations for crewmembers and scientific personnel. Arrangement...

  6. Slovenia’s Construction Act and Implementation Plans: A Case Study of Izola IPA-8

    Science.gov (United States)

    Ažman Momirski, Lucija

    2017-10-01

    The guidelines for urban design in Izola’s IPA-8 planning area, which is earmarked for hotels, apartment complexes, and sports, specify diverse forms of leisure living space required by modern society. The new tourist complex is not a large monotonous hotel complex, but rather a spatial arrangement in which guests experience an authentic local environment and city residents enjoy the new high-quality ambience. The hotel area is defined by three major communication axes from north to south, linking the countryside to the coastal area and opening up attractive sea views in the new complex. Internal east-west links connect buildings and public spaces. Because of the terraced terrain, a large number of paved ramps and internal public gardens have been designed between the structures. The extensions of the communication axes are laid out as squares, named based on the function of the public spaces. Hotel Street is the central axis and main connecting street, with public hotel services and restaurants. The west axis extends into Culture Square, where activities related to Izola’s culture and history are presented; here there is an opportunity to create new galleries, a small local museum, and an exhibition room. Apartment Square is located on the east communication axis, along which only a limited number of trade, catering, and service activities are planned. The plan received first prize in a public competition, and it later developed into detailed municipal spatial plan. In this process, it became clear that Slovenia’s Construction Act (ZGO-1) does not support plans to create terraced buildings.

  7. The ACR: Advanced design features for a short construction schedule

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.

    2003-01-01

    Building on the successful CANDU construction at Qinshan, the ACR-700 is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. A project schedule of 48 months has been developed for the nth ACR unit with a 36 months construction period from First Concrete to Fuel Load. This paper describes some of the advanced design features implemented in the reactor building design in order to achieve this short construction period. These features include large volume concrete pours, prefabricated rebar, composite structures, prefabricated permanent formwork and significant modularization and prefabrication

  8. Planning and architectural safety considerations in designing nuclear power plants

    International Nuclear Information System (INIS)

    Konsowa, Ahmed A.

    2009-01-01

    To achieve optimum safety and to avoid possible hazards in nuclear power plants, considering architectural design fundamentals and all operating precautions is mandatory. There are some planning and architectural precautions should be considered to achieve a high quality design and construction of nuclear power plant with optimum safety. This paper highlights predicted hazards like fire, terrorism, aircraft crash attacks, adversaries, intruders, and earthquakes, proposing protective actions against these hazards that vary from preventing danger to evacuating and sheltering people in-place. For instance; using safeguards program to protect against sabotage, theft, and diversion. Also, site and building well design focusing on escape pathways, emergency exits, and evacuation zones, and the safety procedures such as; evacuation exercises and sheltering processes according to different emergency classifications. In addition, this paper mentions some important codes and regulations that control nuclear power plants design, and assessment methods that evaluate probable risks. (author)

  9. Planning Tunnel Construction Using Markov Chain Monte Carlo (MCMC

    Directory of Open Access Journals (Sweden)

    Juan P. Vargas

    2015-01-01

    Full Text Available Tunnels, drifts, drives, and other types of underground excavation are very common in mining as well as in the construction of roads, railways, dams, and other civil engineering projects. Planning is essential to the success of tunnel excavation, and construction time is one of the most important factors to be taken into account. This paper proposes a simulation algorithm based on a stochastic numerical method, the Markov chain Monte Carlo method, that can provide the best estimate of the opening excavation times for the classic method of drilling and blasting. Taking account of technical considerations that affect the tunnel excavation cycle, the simulation is developed through a computational algorithm. Using the Markov chain Monte Carlo method, the unit operations involved in the underground excavation cycle are identified and assigned probability distributions that, with random number input, make it possible to simulate the total excavation time. The results obtained with this method are compared with a real case of tunneling excavation. By incorporating variability in the planning, it is possible to determine with greater certainty the ranges over which the execution times of the unit operations fluctuate. In addition, the financial risks associated with planning errors can be reduced and the exploitation of resources maximized.

  10. Methodology for modular nuclear plant design and construction

    International Nuclear Information System (INIS)

    Lapp, C.W.; Golay, M.

    1992-01-01

    During the past decade, the rising cost of nuclear power plant construction has caused the cancellation of many projects and has forced some utilities into bankruptcy. Many factors have contributed to capital cost increases, including regulatory changes, the absence of standard designs, and low worker productivity. Low worker productivity can be attributed to the conventional building process, which is not conductive to productive labor. This study presents innovative ways to reduce the capital cost of nuclear plants through more efficient construction processes designed to increase worker productivity. A major portion of the plant capital cost is the interest paid during construction on borrowed capital. Modular fabrication could potentially reduce interest payments by compressing the construction schedule of nuclear facilities. Additional cost savings expected from modular designs arise from improved quality, productivity, and schedule control in fabrication of plant elements within a factory environment

  11. Improving Building Performance through Integrating Constructability in the Design Process

    OpenAIRE

    Ezzat Othman, Ayman Ahmed

    2011-01-01

    The traditional procurment approaches commonly adopted in construction projects and the involvement of multitude of various project participants with diverse objectives, skills and interests tended to separate design from construction.This separation obstructs contractors from providing designers with construction feedback and suggestions for design improvement, which ultimately hampers the improvement of building performance. Because of the importance of the design phase and the vit...

  12. Designing Pension Plans to Incorporate Recent Legislation.

    Science.gov (United States)

    Biggs, John H.

    1983-01-01

    Two proposals before Congress threaten to offset the delicate balance in pension plan design. The significance of the normal retirement feature in plan design, some possible program design changes, and how the pension arrangements of higher education institutions would be affected are discussed. (MLW)

  13. 4D Simulation for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Jeong, Seo G.; Suh, Kune Y.

    2006-01-01

    For the timely and competitive response to rapidly changing energy environment at the turn of millennium, there is a desperate need to build the nuclear power plant (NPP) in the virtual reality of digital engineering prior to commissioning. To construct a NPP is a highly integrated, voluminous project. Verification of design and initial planning is prerequisite to construction to confirm optimal fabrication and high productivity. This paper presents the design feasibility by simulating the initial construction plan of NPP using four-dimensional (4D) simulation. The virtual reality method, using three dimensional (3D) computer-aided design (CAD) model, enables various designs in the project launching stage to be promptly and exactly previewed

  14. Design, Implementation, and Improvement of a Methodology for Strategic Planning for Small and Medium Companies, Based on the Imaginary Construction of Concurrent Competitors

    Directory of Open Access Journals (Sweden)

    Nelson Santos Machado

    2012-06-01

    Full Text Available This article shows the results of five (5 research studies carried out in the western extreme of Santa Catarina, financed with the resources of the Fund to Support Research at the Universidade do Oeste de Santa Catarina – Unoesc or by participating companies. Such research had as its central objective the construction, application, and improvement of a strategic planning methodology adjusted to small and medium enterprises, for which conventional methods have proved to have complex, expensive, and questionable results. Having as reference Fahey (2003, we inserted the construction of an imaginary competitor-like tool of analysis of external and internal environments, as well as the establishment of strategies and actions for the company itself, in a time horizon, which acquires features of a fictitious competitor. The methodological procedures are qualitative, the design is the case study, with the adoption of action research in collecting and interpreting data, and research subjects were employees. The surveys were conducted between 2004 and 2010 in firms of service, commercial, and industrial sectors. As result, this methodology demonstrated applicability and feasibility, being able to be adopted by other companies of similar size and characteristics of those tested empirically. The main advantages are the creative process that involves the construction of an imaginary competitor, the participatory nature and of the use of action research, as well as the attachment that focuses on quality choices based on the experiences of the participants, rather than in statistical series, although they are used.

  15. An integral approach to town planning: lessons from personal construct theory, part 1

    OpenAIRE

    A Jackson

    1986-01-01

    Personal construct theory is introduced as an all-embracing philosophy which provides a consistent framework for integrating different notions about the planning process. The implication is that 'man-the-planner' does not necessarily have constructs which are better, more accurate, or more predictive than his subject, 'man-the-planned'. Policies can be seen as theories, in which case they should be clearly expressed as such. The theory and its methodology have been used in an empirical invest...

  16. Geotechnical information as an important element when planning and designing civil engineering work Bogotá

    OpenAIRE

    Denisse Cangrejo Aljure; Carlos Gustavo Infante

    2010-01-01

    The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...

  17. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  18. Planning of designing and installation of mechanical elements at the gear speed reducer on the basis of the parameter technology

    Directory of Open Access Journals (Sweden)

    D. Letić

    2013-01-01

    Full Text Available The development and implementation of the computer methods at project managing in the part of the planning of designing and installation of mechanical elements with the fit (assembly block of the gear speed reducer is significant and at present irreplaceable engineering task if it has been realized by the modern parameter technology. There are multifunction uses of this organized group of activities, beginning from the quick changeability of elements still in the phase of designing and constructing, thanks to the characteristics of their associativity, still to the wide basis of standard elements that are incorporated in the very program package. Meanwhile, these activities are not simple, so their realization has to be planned from the stand - point of time, resource and cost of realization. For the very designing and constructing was used AutoCAD Mechanical, and for the design managing Microsoft Project.

  19. Noticing climate change in electricity network design and construction

    International Nuclear Information System (INIS)

    Syri, S.; Martikeinen, A.; Lehtonen, M.

    2007-01-01

    The climate change is widely known to cause remarkable effects to electricity network systems on the whole. Some of the changes are good but the most of the changes cause disadvantages to electricity network. Consequence of climate change, blackouts can be long-standing which affect remarkable society and economic life. Most of electricity networks are coming to a renovation phase and the solutions, that are being made nowadays, affect still after decades. Taking account of climate change, now when networks are being developed and planned, it is possible to avoid possible large repair operation and increase reliability of distribution in the future. The aim of this project is to clarify how climate change should be noticed in planning and construction processes. According to the results of this project electricity network companies can be prepared for climate change by developing planning processes and network cost effectively. Also construction processes are being developed but emphasis is on planning process. The results and developed knowledge of VTT research project 'Impacts of climate change on electricity network business' are exploited in this project. In addition, impacts of climate change on cables and transformers are analyzed in collaboration with TKK in the project. (orig.)

  20. Teaching Construction: A Design-Based Course Model

    Science.gov (United States)

    Love, Tyler S.; Salgado, Carlos A.

    2016-01-01

    The focus on construction in T&E education has drastically changed. This article presents a series of topics and design-based labs that can be taught at various grade levels to integrate STEM concepts while also increasing students' overall awareness of construction and structural technologies.

  1. Design, construction and operation features of high-rise structures

    Science.gov (United States)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  2. Enterprise resource planning in a large construction firm: Implementation analysis

    NARCIS (Netherlands)

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  3. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  4. Design and construction of palm kernel cracking and separation ...

    African Journals Online (AJOL)

    Design and construction of palm kernel cracking and separation machines. ... Username, Password, Remember me, or Register. DOWNLOAD FULL TEXT Open Access DOWNLOAD FULL TEXT Subscription or Fee Access. Design and construction of palm kernel cracking and separation machines. JO Nordiana, K ...

  5. Large-scale performance and design for construction activity erosion control best management practices.

    Science.gov (United States)

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  6. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  7. Planning for design quality

    International Nuclear Information System (INIS)

    Marguglio, B.W.

    1977-01-01

    In the nuclear industry and in other high technology industries in which the Government serves as either a customer or a regulator, it is almost always required that the contractor prepare a Quality Program Plan sometimes also referred to as a Quality Program Index. Often, the Quality Program Plan is included as part of the contractor's proposal in response to the Government's or a prime contractor's Request for Proposal. At this stage, the Quality Program Plan serves to demonstrate to the prospective customer the availability of the various quality systems. It provides the customer with a commitment as to the use of these quality systems, thus giving greater assurance that the customer's overall quality and design requirements can be met. The Quality Program Plan is contributing to the salability of the proposal. 1 ref

  8. Development of the radiological protection focus in the site, design and construction of the nuclear power plant in Cuba

    International Nuclear Information System (INIS)

    Rodriguez R, J.M.

    1996-01-01

    The first nuclear station in Cuba NPP Juragua, at present in analysis for starting again the construction, under a multinational economic association, had had as main architect/engineer organization the Design Institute for Nuclear Power Stations of St. Petersburg (former LIAEP). Active participation of Cuban radiation protection specialist of Energoproyecto in the Juragua Project began at the beginning of the site selection works and continued in the design and construction stages up till now, and simultaneously our specialists have been acting as a counterpart of soviet designers, responsible for the general design of the station. Furthermore, some additional works in compliance with the latest safety requirements and the best international practices, which are described, as well as ongoing and planned work were performed. (author). 11 refs., 3 figs

  9. Design and construction of superconductor resonators

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; Goliak, T.; Holmgren, D.W.; Storm, D.W.

    1984-01-01

    A low beta resonator was fabricated at the Nuclear Physics Laboratory, then plated and successfully tested at Stony Brook. The basic design is a quarter wave, cylindrical cavity excited by a magnetic coupling loop. Before the copper prototype was made the exact design parameters were measured by the construction and RF testing of a brass model

  10. Telecommunications network modelling, planning and design

    CERN Document Server

    Evans, Sharon

    2003-01-01

    Telecommunication Network Modelling, Planning and Design addresses sophisticated modelling techniques from the perspective of the communications industry and covers some of the major issues facing telecommunications network engineers and managers today. Topics covered include network planning for transmission systems, modelling of SDH transport network structures and telecommunications network design and performance modelling, as well as network costs and ROI modelling and QoS in 3G networks.

  11. 36 CFR 223.38 - Standards for road design and construction.

    Science.gov (United States)

    2010-07-01

    ... Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  12. Construction Progress and Science Planning for the New Research Vessel R/V Sikuliaq

    Science.gov (United States)

    Whitledge, T. E.

    2011-12-01

    The research vessel R/V Sikuliaq (pronounced [see-KOO-lee-auk]) is currently being constructed on behalf of the NSF to support future scientific studies in high latitude waters. The 261 foot global class vessel will be capable of breaking 2.5 foot thick ice at 2 knots with an endurance of 45 days at sea and cruising at 11 knots. The R/V Sikuliaq will have a beam of 52 feet and a draft of 18.9 feet that will carry 26 scientists and a crew of 20. Berthing accommodations are a combination of single/double rooms with one stateroom and the common areas of the vessel are designed for ADA access and accommodations. The total laboratory space (main, analytical, electronics, wet, upper, and Baltic room will be 2100 square feet. The 4360 square foot working deck that is approximately 70 feet in length will accommodate 2-4 vans and multiple science operations. The vessel design strives to have the lowest possible environmental impact, including a low underwater-radiated noise signature. The science systems are prescribed to be state-of-the-art for bottom mapping, over-the-side "hands free" gear handling, broad band communications and scientific walk-in freezer and environmental chamber. More details and photos of the construction progress are available on the website at www.sfos.uaf.edu/arrv. The tentative shipyard schedule has a launch date of June 2012 and delivery to the University of Alaska Fairbanks in June 2013. Scientific operations following trials and testing is planned to start in January 2014. A Sikuliaq science planning workshop has been arranged for 18-19 February 2012 in Salt Lake City, UT just prior to the 2012 Ocean Sciences meeting. Interested participants should contact Terry Whitledge (terry@ims.uaf.edu).

  13. Integrated watershed management: a planning methodology for construction of new dams in Ethiopia

    NARCIS (Netherlands)

    Bezuayehu, Tefera; Stroosnijder, L.

    2007-01-01

    Integrated watershed management (IWM) is emerging as an alternative to the centrally planned and sectoral approaches that currently characterize the planning process for dam construction in Ethiopia. This report clarifies the concept of IWM, and reviews the major social, environmental and economic

  14. Wall Construction; Carpentry: 901892.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in floor and wall layout, and in the diverse methods and construction of walls. Upon completion of this course the students should have acquired a knowledge of construction plans and structural foundations in addition to a basic knowledge of mathematics. The course consists of…

  15. Dam's design continues throughout construction

    Energy Technology Data Exchange (ETDEWEB)

    Lara E, R; Wulff, J G

    1979-11-01

    In spite of adverse site conditions, Arenal dam in Costa Rica was completed a year ahead of schedule. Historical data on local earthquake activity which was available in unusual detail reduced some uncertainties in design information. Other uncertainties regarding the complex foundation conditions were resolved as excavation and construction progressed.

  16. NCSX Construction Progress and Research Plans

    International Nuclear Information System (INIS)

    Neilson, G.H.; Heitzenroeder, P.; Lyon, J.; Nelson, B.; Reiersen, W.; Zarnstorff, M.

    2005-01-01

    Stellarators use 3D plasma and magnetic field shaping to produce a steady-state disruption-free magnetic confinement configuration. Compact stellarators have additional attractive properties, quasi-symmetric magnetic fields and low aspect ratio. The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge National Laboratory (ORNL) to test the physics of a high-beta compact stellarator with a low-ripple, tokamak-like magnetic configuration. The engineering challenges of NCSX stem from its complex geometry requirements. These issues are addressed in the construction project through manufacturing R and D and system engineering. As a result, the fabrication of the coil winding forms and vacuum vessel are proceeding in industry without significant technical issues, and preparations for winding the coils at PPPL are in place. Design integration, analysis, and dimensional control are functions provided by system engineering to ensure that the finished product will satisfy the physics requirements, especially accurate realization of the specified coil geometries. After completion of construction in 2009, a research program to test the expected physics benefits will start

  17. Seeking Constructive Synergy: Design Science and the Constructive Research Approach

    DEFF Research Database (Denmark)

    Piirainen, Kalle; Gonzalez, Rafael A.

    2013-01-01

    Information systems research and management science create knowledge which can be applied in organizations. Design science specifically aims at applying existing knowledge to solve interesting and relevant business problems and has been steadily gaining support in information systems research....... However, design science is not the only design-oriented framework. Accordingly, this raises the question of whether it is possible to compare the results obtained from different brands of design-oriented research. This paper contributes to answering this question by comparing two research approaches......, enabling mutual learning possibilities and suggesting improvements in transparency and rigor. The objective of this paper is to compare design science research with the constructive research approach. The conclusion is that the two approaches are compatible, save for details in practical requirements...

  18. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  19. Engineering and Design. Design, Construction, and Maintenance of Relief Wells

    National Research Council Canada - National Science Library

    1992-01-01

    The objective of this manual is to provide guidance and information on the design, construction, and maintenance of pressure relief wells installed for the purpose of relieving subsurface hydrostatic...

  20. Study on Strategic Planning of Road and Bridge Infrastructure Development in City Planning: Taking Porto-novo City of Benin Republic as Example

    Directory of Open Access Journals (Sweden)

    Boko-haya Dossa Didier

    2018-01-01

    Full Text Available Concern about the townlet infrastructure construction in developing country is one of the crucial part of county town planning and development. By taking the overall planning and design in a case study of Porto-novo city at Republic of Benin, this paper analyzes the characteristics and opportunities of Porto-novo city and puts forward corresponding infrastructure construction strategy. In the end, the paper comes up with specific plan of planning and design under the background of Porto-novo's planning of development strategy.

  1. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  2. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  3. Global floor planning approach for VLSI design

    International Nuclear Information System (INIS)

    LaPotin, D.P.

    1986-01-01

    Within a hierarchical design environment, initial decisions regarding the partitioning and choice of module attributes greatly impact the quality of the resulting IC in terms of area and electrical performance. This dissertation presents a global floor-planning approach which allows designers to quickly explore layout issues during the initial stages of the IC design process. In contrast to previous efforts, which address the floor-planning problem from a strict module placement point of view, this approach considers floor-planning from an area planning point of view. The approach is based upon a combined min-cut and slicing paradigm, which ensures routability. To provide flexibility, modules may be specified as having a number of possible dimensions and orientations, and I/O pads as well as layout constraints are considered. A slicing-tree representation is employed, upon which a sequence of traversal operations are applied in order to obtain an area efficient layout. An in-place partitioning technique, which provides an improvement over previous min-cut and slicing-based efforts, is discussed. Global routing and module I/O pin assignment are provided for floor-plan evaluation purposes. A computer program, called Mason, has been developed which efficiently implements the approach and provides an interactive environment for designers to perform floor-planning. Performance of this program is illustrated via several industrial examples

  4. Interactive urban design using integrated planning requirements control

    NARCIS (Netherlands)

    Vries, de B.; Tabak, V.; Achten, H.H.

    2005-01-01

    Urban planning and urban design are separated disciplines. As a consequence, there is hardly any feedback from the urban design process to the urban planning process. To improve interaction between these two, an interactive urban design (IUD) tool has been developed. The tool is implemented in a

  5. A design methodology to reduce waste in the construction process

    Institute of Scientific and Technical Information of China (English)

    AndrewN.BALDWIN; SimonA.AUSTIN; AndrewKEYS

    2003-01-01

    This paper describes a conceptual tool to enable construction professional to identify where waste is generated during the construction of buildings and address how it can be reduced. It allows an improvement in the waste management practices on site by forecasting future waste types and volumes. It will reduce waste volumes on site through identification of wasteful design practices. The tool contributes to all stages of design and construction. At the Concept Stage of Design the proposed methodology provides a framework for reducing waste through better informed decisions. At the Detailed Design Stage it gives a methodology to address the areas of concern and provide focused information to aid the reduction of waste through informed design decisions. During construction it provides a tool to predict waste types arising on site thus allowing a system of proaclive waste management that will aid skip segregation strategies leading to improved waste recycling and waste reuse.

  6. NSS design and plant construction interfaces

    International Nuclear Information System (INIS)

    Stewart, J.J.; Cobb, W.A.

    1976-01-01

    Interface management between NSS design, balance-of-plant design, and plant construction may have a significant effect on schedule stretchout and total plant costs. The paper discusses the importance of the NSS supplier's interface management role, the favorable and unfavorable influencing factors, and examples of interface areas in which experience has demonstrated that problems may arise. Where appropriate, actions are defined to avoid the problems or mitigate the consequences

  7. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  8. The integration of price/cost modelling and construction planning - the automated generation of construc­tion operation

    Directory of Open Access Journals (Sweden)

    P. A. Bowen

    1997-07-01

    Full Text Available The fact that traditional price/cost models are unrelated to the construction process renders them largely unsuited to the provision of meaningful price/cost advice. The nature and lengthiness of the construction planning process has precluded its incorporation into price/cost modelling during the pre-tender phase of the traditional building procurement process. The nub of the modelling problem has been how to integrate the complex process of construction planning into the pre-tender price/cost modelling process. In this paper the authors propose the synthesis of artificial intelligence techniques and construction planning techniques, resulting in a conceptual framework for a network-based cost modelling system for use by quantity surveyors in the cost modelling of buildings.

  9. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  10. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    Science.gov (United States)

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  11. Interior design. Mastering the master plan.

    Science.gov (United States)

    Mesbah, C E

    1995-10-01

    Reflecting on the results of the survey, this proposed interior design master planning process addresses the concerns and issues of both CEOs and facility managers in ways that focus on problem-solving strategies and methods. Use of the interior design master plan process further promotes the goals and outcomes expressed in the survey by both groups. These include enhanced facility image, the efficient selection of finishes and furnishings, continuity despite staff changes, and overall savings in both costs and time. The interior design master plan allows administrators and facility managers to anticipate changes resulting from the restructuring of health care delivery. The administrators and facility managers are then able to respond in ways that manage those changes in the flexible and cost-effective manner they are striving for. This framework permits staff members to concentrate their time and energy on the care of their patients--which is, after all, what it's all about.

  12. Comparative study of plans for integrated residue management of construction: an analysis documental

    OpenAIRE

    Júnior, Jorge Henrique e Silva; Vieira, Elizângela de Jesus Oliveira de Sousa; Monte, Maria José Soares; Carvalho, Moisés Lopes; Oliveira, Francílio de Carvalho; Carvalho, Jancineide Oliveira de

    2013-01-01

    Objective: The present study is a comparative study of integrated plans in four cities, highlighting the points that are in accordance with Resolution 307/2002 of CONAMA. Methods: This is a bibliographic and documentary research as having scientific articles sources Plans and Integrated Solid Waste Management Construction of five Brazilian cities: Curitiba, Cuiaba, Florianopolis, Rio de Janeiro and São Paulo. Results: The resolution foresees the Integrated Management of Residues Plan for Cons...

  13. Support to design and construction of the PBMR plant

    International Nuclear Information System (INIS)

    Cazorla, F.; Moron, P.; Gonzalez, J. I.

    2010-01-01

    Developing the new reactor design to a licensable state for constructing a pilot plant is a tough task require specific resources, concerning knowledge and previous experience, which trespassing the pure scientific or technologic knowledge linked to the reactor conceptual design. Taking into consideration the experience derived from the collaboration between the South African company PBMR (PTY) Ltd.; the Pebble Bed Modular Reactor Designer, and Tecnatom SA, the article presents some of the aspects in which the companies or organization in charge of the design can demand external support to license and construct the pilot plants with guaranteed success. (Author)

  14. Study on the methods of rational analysis about the area of the Planning of Sea Usage of Regional Construction

    Science.gov (United States)

    Ya-Juan, Li; Tian-Yu, Mao; Mingjing-Tian

    2018-03-01

    The Planning of Sea Usage of Regional Construction is a new area, and the rational analysis about the area of which is one of its difficulties. Based on “Urban land classification and land use planning and construction standards”, the land use control index method study the rationality of the sea usage area of the whole region, by accumulating for specific land use indicators for each land type within the planning area. This paper, takeing the project named “caofeidian integrated service area” for example, make a little study on the land use control index method used by the sea usage demonstration of the planning of sea usage of regional construction. The study will be good for improving the technical methods of rational analysis about the area of the planning of sea usage of regional construction.

  15. A Decision Support Concept for a construction design project – selecting the type of glass façade

    Directory of Open Access Journals (Sweden)

    Franjo Šimić

    2017-01-01

    Full Text Available The paper describes research into the possibility of developing a concept for supporting decisions in planning construction projects (one of the most important stages of construction project management. The focus is on supporting decisions in selecting the type of and solution for the glass façade in the main design. Materials and types of soluteons for a glass façade were analyzed and alternative solutions were obtained. The concept was developed in that it included relevant stakeholders in the decision-making process during the construction design. These stakeholders were the investor, architect, and construction contractor. The analysis was carried out and a hierarchical structure of objectives was formed as a goal tree. The criteria at the last hierarchical level were used to evaluate alternative solutions for the glass façade, and their weights were determined by all stakeholders using the AHP method (Analytic Hierarchy Process. Using PROMETHEE (Preference Ranking Method for Enrichment Evaluation, a comparison of alternative solutions for the glass façade was conducted and the alternatives were ranked according to the priorities for inclusion into the main design. The concept was tested by selecting a type of glass façade on a residential-commercial building in the city of Rijeka, Croatia.

  16. The constructal law of design and evolution in nature

    Science.gov (United States)

    Bejan, Adrian; Lorente, Sylvie

    2010-01-01

    Constructal theory is the view that (i) the generation of images of design (pattern, rhythm) in nature is a phenomenon of physics and (ii) this phenomenon is covered by a principle (the constructal law): ‘for a finite-size flow system to persist in time (to live) it must evolve such that it provides greater and greater access to the currents that flow through it’. This law is about the necessity of design to occur, and about the time direction of the phenomenon: the tape of the design evolution ‘movie’ runs such that existing configurations are replaced by globally easier flowing configurations. The constructal law has two useful sides: the prediction of natural phenomena and the strategic engineering of novel architectures, based on the constructal law, i.e. not by mimicking nature. We show that the emergence of scaling laws in inanimate (geophysical) flow systems is the same phenomenon as the emergence of allometric laws in animate (biological) flow systems. Examples are lung design, animal locomotion, vegetation, river basins, turbulent flow structure, self-lubrication and natural multi-scale porous media. This article outlines the place of the constructal law as a self-standing law in physics, which covers all the ad hoc (and contradictory) statements of optimality such as minimum entropy generation, maximum entropy generation, minimum flow resistance, maximum flow resistance, minimum time, minimum weight, uniform maximum stresses and characteristic organ sizes. Nature is configured to flow and move as a conglomerate of ‘engine and brake’ designs. PMID:20368252

  17. Y-12 Sustainable Design Principles for Building Design and Construction

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, J. G.

    2008-11-01

    B&W Y-12 is committed to modernizing the Y-12 complex to meet future needs with a sustainable and responsive infrastructure and to integrating sustainability principles and practices into Y-12 work (Y72-001, B&W Y-12 Environmental, Safety and Health Policy). This commitment to sustainability and specifically sustainable design of buildings is also incorporated into Presidential Executive Orders (EO), DOE Orders (DOE O), and goals. Sustainable building design is an approach to design, construct, and operate facilities in an efficient and environmentally sound manner that will produce a healthful, resource-efficient and productive working environment that is inherently protective of the environment. The DOE has established the following 5 Guiding Principles for High Performance Sustainable Building (HPSB), and has issued directives that require Y-12 to incorporate the principles and a number of supporting specific practices and techniques into building design, construction and renovation projects: (1) Employ Integrated Design Principles; (2) Optimize Energy Performance; (3) Protect and Conserve Water; (4) Enhance Indoor Environmental Quality; and (5) Reduce Environmental Impact of Materials. The purpose of this document is to present the required sustainable building principles, practices and techniques, summarize the key drivers for incorporating them into Y-12 projects, and present additional recommendations and resources that can be used to support sustainable buildings to enhance the environmental and economic performance of the Y-12 Complex.

  18. Developing plan and pre-conceptual design of target system for JAERI`s high intensity neutron source

    Energy Technology Data Exchange (ETDEWEB)

    Hino, Ryutaro; Kaminaga, Masanori; Haga, Katsuhiro; Ishikura, Syuichi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Nakamura, Fumito; Uchida, Shoji

    1997-11-01

    This paper presents an outline of developing plan of a target system and topics obtained by a pre-conceptual design, which aims to establish a technology base of the target system and to make clear a system concept. In the plan, two types of target - solid and mercury targets - are to be developed for a neutron scattering facility. Information obtained through the development shall be applied to designs of an irradiation and a transmutation facilities. Through the pre-conceptual design, system arrangement, scale etc. were made clear: total weight will be 12000 ton, and 26 beam lines with beam shutters will be equipped for 4 moderators. Engineering problems were also made clear through the design; high flux heat removal, dynamic stress caused by thermal shock and pressure wave, loop technology for the mercury target and a slurry moderator consisting of methane pellets and liquefied hydrogen. We are now constructing new test apparatuses and arranging computer codes for solving these problems. (author)

  19. The flower and the butterfly constructed wetland system at Koh Phi Phi - system design and lessons learned during implementation and operation

    DEFF Research Database (Denmark)

    Brix, Hans; Koottatep, Thammarat; Fryd, Ole

    2011-01-01

    In 2007, a constructed wetland system was implemented on the tourist island of Koh Phi Phi in Southern Thailand. This paper presents the process of planning, designing and implementing the system and discusses the performance and operational issues 3 years after implementation. The system is an i...

  20. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    OpenAIRE

    Iakymchuk Iryna M.

    2017-01-01

    The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiv...

  1. The Role of Hypothesis in Constructive Design Research

    DEFF Research Database (Denmark)

    Bang, Anne Louise; Krogh, Peter; Ludvigsen, Martin

    2012-01-01

    and solid perspective on how to keep constructive design research on track, this paper offers a model for understanding the role of hypothesis in constructive design research. The model allows for understanding the hypothesis’s relation to research motivation, questions, experiments, evaluation...... and knowledge production. The intention of the model is to have it serve as a tool in the research process aiding the researcher to understand at what “level” discussions and claims are brought forward, and what consequences these might have for the research work at hand. Thus, the paper claims the central...

  2. Design and Construction Documents Associated with N232, Sustainability Base

    Science.gov (United States)

    Zornetzer, Steven F.; Schuler, Raymond F.; Grymes, Rosalind A.

    2014-01-01

    This request comprehensively covers documents associated with the design and construction of Sustainability Base, N232. The intent of this project specifically envisioned broad dissemination of these materials to others undertaking the design and construction of high-performing energy- and resource-efficient buildings in comparable climate zones.

  3. Assessing problem-solving skills in construction education with the virtual construction simulator

    Science.gov (United States)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on

  4. Planning as situated design

    DEFF Research Database (Denmark)

    Axel, Erik

    It is common to associate situated activity with concrete, craftlike or manual activity here and now and to reserve theoretical and abstract thinking for activities like theoretical experimentation and systematic planning. Much work has gone into demonstrating that these activities are concrete...... and situated, too. In this presentation it will be argued that the investigation of systematic planning as conflictual cooperation will help us see that situated activity is not only based on the present conditions, but also relates them to events spread out in time and space, thereby opening up for another...... understanding of theoretical thinking. Some material from the empirical research project developed with Klaus Nielsen on the design and engineering of a house will be presented. On this basis a conception of planning will be unfolded. It will be understood differently from the way it is understood...

  5. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  6. IT Requirements Integration in High-Rise Construction Design Projects

    Science.gov (United States)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  7. Management of Foreign Military Sales Design and Construction Services

    National Research Council Canada - National Science Library

    Young, Shelton

    1995-01-01

    ...) design and construction services. In addition, we examined the role of the Air Force in the administration of FMS construction projects at the request of the then Assistant Deputy Under Secretary of Defense...

  8. Power supply for the Spanish stellarator TJ-II, design, construction, and tests

    Energy Technology Data Exchange (ETDEWEB)

    Perez, A.; Lucia, C.; Alberdi, B.; Del Rio, J.M. [JEMA SA, Lasarte-Oria (Spain); Almoguera, L.; Blaumoser, M.; Kirpitchev, I.; Mendez, P. [Asociacion EURATOM-CIEMAT para Fusion, Madrid (Spain)

    1995-12-31

    Most of the components of the electrical power supply system of the new TJ-II stellarator, which is under construction in Madrid (Spain), are now constructed and tested. The flywheel synchronous generator is still under construction and its tests are planned for the end of 1995. The power plant is described in detail as well as the tests which have been carried out and their results.

  9. Analysis, Design, and Construction of a Base-Isolated Multiple Building Structure

    Directory of Open Access Journals (Sweden)

    Stefano Sorace

    2014-01-01

    Full Text Available The analysis and design of a multiple residential building, seismically protected by a base isolation system incorporating double friction pendulum sliders as protective devices, are presented in the paper. The building, situated in the suburban area of Florence, is composed of four independent reinforced concrete framed structures, mutually separated by three thermal expansion joints. The plan is L-shaped, with dimensions of about 75 m in the longitudinal direction and about 30 m along the longest side of the transversal direction. These characteristics identify the structure as the largest example of a base-isolated “artificial ground” ever built in Italy. The base isolation solution guarantees lower costs, a much greater performance, and a finer architectural look, as compared to a conventional fixed-base antiseismic design. The characteristics of the building and the isolators, the mechanical properties and the experimental characterization campaign and preliminary sizing carried out on the latter, and the nonlinear time-history design and performance assessment analyses developed on the base isolated building are reported in this paper, along with details about the installation of the isolators and the plants and highlights of the construction works.

  10. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    Directory of Open Access Journals (Sweden)

    Iakymchuk Iryna M.

    2017-09-01

    Full Text Available The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiveness of innovation project by providing cost-management services at all stages of investment project, identifying opportunities for reducing them, thereby contributing to sustainable development of construction organization over time. It has been concluded that the more specific the program of activities of construction organization, the more accurate the process of identification of costs becomes, the more efficient is the management of costs, targeted at saving resources, reducing the self cost of construction works.

  11. Plan of deep underground construction for investigations on high-level radioactive waste storage

    International Nuclear Information System (INIS)

    Mayanovskij, M.S.

    1996-01-01

    The program of studies of the Japanese PNC corporation on construction of deep underground storage for high-level radioactive wastes is presented. The program is intended for 20 years. The total construction costs equal about 20 billion yen. The total cost of the project is equal to 60 billion yen. The underground part is planned to reach 1000 m depth

  12. Designing anticancer peptides by constructive machine learning.

    Science.gov (United States)

    Grisoni, Francesca; Neuhaus, Claudia; Gabernet, Gisela; Müller, Alex; Hiss, Jan; Schneider, Gisbert

    2018-04-21

    Constructive machine learning enables the automated generation of novel chemical structures without the need for explicit molecular design rules. This study presents the experimental application of such a generative model to design membranolytic anticancer peptides (ACPs) de novo. A recurrent neural network with long short-term memory cells was trained on alpha-helical cationic amphipathic peptide sequences and then fine-tuned with 26 known ACPs. This optimized model was used to generate unique and novel amino acid sequences. Twelve of the peptides were synthesized and tested for their activity on MCF7 human breast adenocarcinoma cells and selectivity against human erythrocytes. Ten of these peptides were active against cancer cells. Six of the active peptides killed MCF7 cancer cells without affecting human erythrocytes with at least threefold selectivity. These results advocate constructive machine learning for the automated design of peptides with desired biological activities. © 2018 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  13. Establishment of Biosafety Level-3 (BSL-3 laboratory: Important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting

    Directory of Open Access Journals (Sweden)

    Devendra T Mourya

    2014-01-01

    This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.

  14. Information Management for Factory Planning and Design

    OpenAIRE

    Chen, Danfang

    2012-01-01

    This thesis is dedicated to the manufacturing industry for the improvement of information management within the factory planningand design domain, and for more efficient factory planning and design. Currently the manufacturing industry lacks sufficient methods for capturing, structuring, and representing information and knowledge for easy access, exchange, integration and reuse within the domain. Therefore the focus of this thesis is on information and knowledge management within factory plan...

  15. Outline of principle of design construction of demolished concrete from electric power plant

    International Nuclear Information System (INIS)

    Takahashi, Tomohiko; Sakagami, Takeharu; Inagaki, Hirokazu; Morozumi, Hironori; Muranaka, Kenji

    2005-01-01

    'The principle of design construction of recycled demolished concrete from electric power plant' (a plan) is going to be published by TSCE Concrete Committee in 2005. The abstract of the above principle is described. A large amount of demolished concrete is generated by decommissioning of atomic power plant. About 450,000 to 500,000t of concrete with small radiation level per an atomic power plant will be generated. This report included decommissioning of Tokai power plant, characteristics of subject of demolished concrete, the recycled demolished concrete, fresh conditions of the recycled demolished concrete, the strength, deformation properties, durability, alkali silica reactivity of them and control measurement. (S.Y.)

  16. design, construction and measured performance of a single-stage

    African Journals Online (AJOL)

    2012-11-03

    Nov 3, 2012 ... Abstract. The design philosophy, construction and measured performances of a single stage, single entry centrifugal pump .... the tachometer spindle to be held against a recess in the motor shaft. The constructed centrifugal ...

  17. The buffer/container experiment design and construction report

    Energy Technology Data Exchange (ETDEWEB)

    Chandler, N.A.; Wan, A.W.L.; Roach, P.J

    1998-03-01

    The Buffer/Container Experiment was a full-scale in situ experiment, installed at a depth of 240 m in granitic rock at AECL's Underground Research Laboratory (URL). The experiment was designed to examine the performance of a compacted sand-bentonite buffer material under the influences of elevated temperature and in situ moisture conditions. Buffer material was compacted in situ into a 5-m-deep, 1.24-m-diameter borehole drilled into the floor of an excavation. A 2.3-m long heater, representative of a nuclear fuel waste container, was placed within the buffer, and instrumentation was installed to monitor changes in buffer moisture conditions, temperature and stress. The experiment was sealed at the top of the borehole and restrained against vertical displacement. Instrumentation in the rock monitored pore pressures, temperatures and rock displacement. The heater was operated at a constant power of 1200 W, which provided a heater skin temperature of approximately 85 degrees C. Experiment construction and installation required two years, followed by two and a half years of heater operation and two years of monitoring the rock conditions during cooling. The construction phase of the experiment included the design, construction and testing of a segmental heater and controller, geological and hydrogeological characterization of the rock, excavation of the experiment room, drilling of the emplacement borehole using high pressure water, mixing and in situ compaction of buffer material, installation of instrumentation in the rock, buffer and on the heater, and the construction of concrete curb and steel vertical restraint system at the top of emplacement borehole. Upon completion of the experiment, decommissioning sampling equipment was designed and constructed and sampling methods were developed which allowed approximately 2000 samples of buffer material to be taken over a 12-day period. Quality assurance procedures were developed for all aspects of experiment

  18. The buffer/container experiment design and construction report

    International Nuclear Information System (INIS)

    Chandler, N.A.; Wan, A.W.L.; Roach, P.J.

    1998-03-01

    The Buffer/Container Experiment was a full-scale in situ experiment, installed at a depth of 240 m in granitic rock at AECL's Underground Research Laboratory (URL). The experiment was designed to examine the performance of a compacted sand-bentonite buffer material under the influences of elevated temperature and in situ moisture conditions. Buffer material was compacted in situ into a 5-m-deep, 1.24-m-diameter borehole drilled into the floor of an excavation. A 2.3-m long heater, representative of a nuclear fuel waste container, was placed within the buffer, and instrumentation was installed to monitor changes in buffer moisture conditions, temperature and stress. The experiment was sealed at the top of the borehole and restrained against vertical displacement. Instrumentation in the rock monitored pore pressures, temperatures and rock displacement. The heater was operated at a constant power of 1200 W, which provided a heater skin temperature of approximately 85 degrees C. Experiment construction and installation required two years, followed by two and a half years of heater operation and two years of monitoring the rock conditions during cooling. The construction phase of the experiment included the design, construction and testing of a segmental heater and controller, geological and hydrogeological characterization of the rock, excavation of the experiment room, drilling of the emplacement borehole using high pressure water, mixing and in situ compaction of buffer material, installation of instrumentation in the rock, buffer and on the heater, and the construction of concrete curb and steel vertical restraint system at the top of emplacement borehole. Upon completion of the experiment, decommissioning sampling equipment was designed and constructed and sampling methods were developed which allowed approximately 2000 samples of buffer material to be taken over a 12-day period. Quality assurance procedures were developed for all aspects of experiment construction

  19. Review and comment on the US Department of Energy Site Characterization Plan Conceptual Design report

    International Nuclear Information System (INIS)

    1988-10-01

    The ''Site Characterization Plan Conceptual Design Report,'' as prepared by the United States Department of Energy and its contractors, depicts the conceptual designs being proposed for the Yucca Mountain, Nevada High-Level Waste Repository. Much of the report is comprised of designs based on large assumptions that lead to inconclusiveness in terms of technical integrity and reasonableness. As a result, the likely success of the designs proposed within the report is highly questionable from a technical and even constructibility standpoint. Grave deficiencies have been found throughout the report ranging from the over-simplification of the geologic and geohydrologic setting to the incorrect determination of the repository horizon's host rock strength. All of these deficiencies found within the report relate directly to the probable outcome of the site characterization of Yucca Mountain and the possible design and construction of a high-level waste repository at the site. It does not appear that a concerted effort has been put forth to develop many of the concepts within the report to a reasonable level of engineering and scientific integrity that would be suitable to meet the needs of and provide the results to the Nation's High-Level Waste Program

  20. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  1. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  2. Constructed wetlands for pollution control: processes, performance, design and operation

    National Research Council Canada - National Science Library

    2000-01-01

    .... Types of constructed wetland, major design parameters, role of vegetation, hydraulic patterns, loadings, treatment efficiency, construction, operation and maintenance costs are discussed in depth...

  3. Hanford Site waste tank farm facilities design reconstitution program plan

    International Nuclear Information System (INIS)

    Vollert, F.R.

    1994-01-01

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980's has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan

  4. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  5. Heat pump planning handbook

    CERN Document Server

    Bonin, Jürgen

    2015-01-01

    The Heat Pump Planning Handbook contains practical information and guidance on the design, planning and selection of heat pump systems, allowing engineers, designers, architects and construction specialists to compare a number of different systems and options. Including detailed descriptions of components and their functions and reflecting the current state of technology this guide contains sample tasks and solutions as well as new model calculations and planning evaluations. Also economic factors and alternative energy sources are covered, which are essential at a time of rising heat costs. T

  6. 105-KE Basin Pilot Run design plan

    International Nuclear Information System (INIS)

    Sherrell, D.L.

    1994-01-01

    This document identifies all design deliverables and procedures applicable to the 105-KE Basin Pilot Run. It also establishes a general design strategy, defines interface control requirements, and covers planning for mechanical, electrical, instrument/control system, and equipment installation design

  7. NRC Seismic Design Margins Program Plan

    International Nuclear Information System (INIS)

    Cummings, G.E.; Johnson, J.J.; Budnitz, R.J.

    1985-08-01

    Recent studies estimate that seismically induced core melt comes mainly from earthquakes in the peak ground acceleration range from 2 to 4 times the safe shutdown earthquake (SSE) acceleration used in plant design. However, from the licensing perspective of the US Nuclear Regulatory Commission, there is a continuing need for consideration of the inherent quantitative seismic margins because of, among other things, the changing perceptions of the seismic hazard. This paper discusses a Seismic Design Margins Program Plan, developed under the auspices of the US NRC, that provides the technical basis for assessing the significance of design margins in terms of overall plant safety. The Plan will also identify potential weaknesses that might have to be addressed, and will recommend technical methods for assessing margins at existing plants. For the purposes of this program, a general definition of seismic design margin is expressed in terms of how much larger that the design basis earthquake an earthquake must be to compromise plant safety. In this context, margin needs to be determined at the plant, system/function, structure, and component levels. 14 refs., 1 fig

  8. An Agent Based Approach for Project Management in Construction

    OpenAIRE

    Sencer, Safiye; Turgay, Tahsin

    2013-01-01

    Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...

  9. Design and Construction of a Hydroturbine Test Facility

    Science.gov (United States)

    Ayli, Ece; Kavurmaci, Berat; Cetinturk, Huseyin; Kaplan, Alper; Celebioglu, Kutay; Aradag, Selin; Tascioglu, Yigit; ETU Hydro Research Center Team

    2014-11-01

    Hydropower is one of the clean, renewable, flexible and efficient energy resources. Most of the developing countries invest on this cost-effective energy source. Hydroturbines for hydroelectric power plants are tailor-made. Each turbine is designed and constructed according to the properties, namely the head and flow rate values of the specific water source. Therefore, a center (ETU Hydro-Center for Hydro Energy Research) for the design, manufacturing and performance tests of hydraulic turbines is established at TOBB University of Economics and Technology to promote research in this area. CFD aided hydraulic and structural design, geometry optimization, manufacturing and performance tests of hydraulic turbines are the areas of expertise of this center. In this paper, technical details of the design and construction of this one of a kind test facility in Turkey, is explained. All the necessary standards of IEC (International Electrotechnical Commission) are met since the test facility will act as a certificated test center for hydraulic turbines.

  10. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Planning, bidding, contracting, and constructing. [See...) ASSOCIATIONS Community Facility Loans § 1942.9 Planning, bidding, contracting, and constructing. [See §§ 1942....18(l) of this subpart will not be considered when an FmHA or its successor agency under Public Law...

  11. The relationship between motivations of architectural designers and environmentally sustainable construction design

    OpenAIRE

    Murtagh, N. M.; Roberts, A.; Hind, R.

    2016-01-01

    Research on sustainability in construction design has tended to focus on technological, institutional and economic drivers but there has been little change in the industry. Social scientific approaches offer insights on the lack of progress. However, few previous studies have investigated psychological factors despite the pivotal role of the individual professional decision-maker. The aim was to understand what personal motivations drive architectural designers to pursue sustainable design in...

  12. Design And Construction Of 300W Audio Power Amplifier For Classroom

    Directory of Open Access Journals (Sweden)

    Shune Lei Aung

    2015-07-01

    Full Text Available Abstract This paper describes the design and construction of 300W audio power amplifier for classroom. In the construction of this amplifier microphone preamplifier tone preamplifier equalizer line amplifier output power amplifier and sound level indicator are included. The output power amplifier is designed as O.C.L system and constructed by using Class B among many types of amplifier classes. There are two types in O.C.L system quasi system and complementary system. Between them the complementary system is used in the construction of 300W audio power amplifier. The Multisim software is utilized for the construction of audio power amplifier.

  13. Design, construction and evaluation of a meteorological mobile mast ...

    African Journals Online (AJOL)

    A 30 metre meteorological mobile mast has been designed and constructed for upper air profile measurements. The parameters to be measured are wind speed, wind direction, temperature and relative humidity. The sensors for each parameter to be measured are constructed with locally available materials.

  14. DESIGN AND CONSTRUCTION OF A FOREST SPATIAL DATABASE: AN APPLICATION

    Directory of Open Access Journals (Sweden)

    Turan Sönmez

    2006-11-01

    Full Text Available General Directorate of Forests (GDF has not yet created the spatial forest database to manage forest and catch the developed countries in forestry. The lack of spatial forest database results in collection of the spatial data redundancy, communication problems among the forestry organizations. Also it causes Turkish forestry to be backward of informatics’ era. To solve these problems; GDF should establish spatial forest database supported Geographic Information System (GIS. To design the spatial database, supported GIS, which provides accurate, on time and current data/info for decision makers and operators in forestry, and to develop sample interface program to apply and monitor classical forest management plans is paramount in contemporary forest management planning process. This research is composed of three major stages: (i spatial rototype database design considering required by the three hierarchical organizations of GDF (regional directorate of forests, forest enterprise, and territorial division, (ii user interface program developed to apply and monitor classical management plans based on the designed database, (iii the implementation of the designed database and its user interface in Artvin Central Planning Unit.

  15. Expected treatment dose construction and adaptive inverse planning optimization: Implementation for offline head and neck cancer adaptive radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Yan Di; Liang Jian [Department of Radiation Oncology, Beaumont Health System, Royal Oak, Michigan 48073 (United States)

    2013-02-15

    Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect to the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions

  16. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Construction management research at the interface of design and explanatory science

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2011-01-01

    Purpose – The purpose of this study is to characterize construction management research at the interface of explanatory science and design science. Design/methodology/approach – The dual nature of construction management research is analyzed by relating this field of research to natural science,

  18. Evaluating Levels of Project Planning and their Effects on Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Godwin Idoro

    2012-11-01

    Full Text Available This study compares the level of project planning on public andprivate sectors projects and its impact on performance. Thepurpose is to create awareness of the level and effectivenessof the planning done by public and private clients in the deliveryof construction projects. A questionnaire survey administeredto a sample of 130 client representatives selected by stratifi edrandom sampling from the population of public and private clientsin the Nigerian construction industry is used and analysed usingdescriptive statistics, the t-test and Spearman correlation test. Theresults show that the level of preconstruction planning on privatesector projects is higher than that of public sector projects whilethe level of contract planning done by the latter is higher thanthat of the former. Furthermore, the performance of private sectorprojects is higher than that of public sector projects in many of theparameters used. However, the level of preparation of life-cyclecharts that concern project delivery time in both public and privatesectors projects is low and the level of project planning in the twocategories of projects has a limited impact on project performance.The understanding of how public and private sectors projectsperform in planning and its impact are expected to assist publicand private clients to know the challenges ahead of them in theireffort to improve the planning and performance of their projects.

  19. Genetic algorithm optimization for dynamic construction site layout planning

    Directory of Open Access Journals (Sweden)

    Farmakis Panagiotis M.

    2018-02-01

    Full Text Available The dynamic construction site layout planning (DCSLP problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

  20. 谈项目施工的前期策划%Discussion on pre planning of project construction

    Institute of Scientific and Technical Information of China (English)

    谷来喜

    2014-01-01

    论述了项目前期策划的重要性,依据项目前期策划的基本原则,对项目策划的组织机构、施工部署、技术、质量、安全管理策划等项目施工前期策划编制的主要内容作了阐述,为项目管理提供参考依据。%This paper discussed the importance of project pre planning, based on the basic principles of project pre planning, elaborated the main contents of project planning organization, construction planning, technology, quality, safety management preparation and project construc-tion pre planning, provide reference basis for project management.

  1. GIS-based planning system for managing the flow of construction and demolition waste in Brazil.

    Science.gov (United States)

    Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo

    2018-05-01

    The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.

  2. Design and construction of the CDF central tracking chamber

    International Nuclear Information System (INIS)

    Bedeschi, F.; Berge, J.P.; Bofill, J.; Dell'Orso, M.; Foster, G.W.; Hrycyk, M.; Kadel, R.W.; Kowalski, J.; Mukherjee, A.; Newman-Holmes, C.; O'Meara, J.; Patrick, J.; Tinsley, D.; Wagner, R.L.; Yarema, R.; Byon, A.

    1988-01-01

    We describe the design and construction of a large drift chamber of a novel design well adapted for operation in high magnetic fields and in the high track density environment of hadron colliders. (orig.)

  3. Ports and Terminals : Planning and Functional Design

    NARCIS (Netherlands)

    Groenveld, R.; Velsink, H.

    1993-01-01

    1. Maritime transport, means and commodities 3. Principles of integrated port planning 4. Planning and design of a port's water areas 5. Port terminals - introduction 6. Conventional general cargo terminals 7. Container terminals 8. Oil & liquid gas terminals 9. Dry bulk cargo terminals 10. Fishery

  4. Constructal Theory and Aeroelastic Design of Flexible Flying Wing Aircraft

    Directory of Open Access Journals (Sweden)

    Pezhman Mardanpour

    2017-07-01

    Full Text Available The aeroelastic behavior of high-aspect-ratio very flexible flying wing is highly affected by the geometric nonlinearities of the aircraft structure. This paper reviews the findings on how these nonlinearities influence the structural and flight dynamics, and it shows that the aeroelastic flight envelope could significantly be extended with proper choices of design parameters such as engine placement. Moreover, in order to investigate the physics behind the effects of design parameters, constructal theory of design is reviewed. The constructal theory advances the philosophy of design as science, it states that the better structural design emerges when stress flow strangulation is avoided. Furthermore, it shows that airplanes, through their evolution, have obeyed theoretical allometric rules that unite their designs.

  5. Arrangement and planning of developer’s activities in the course of construction megaprojects implementation

    Directory of Open Access Journals (Sweden)

    Orlov Alexandr K.

    2017-01-01

    Full Text Available The paper deals with the specific features of megaprojects. Problems related to real estate reproduction in the course of construction megaprojects implementation were analyzed. Considering the specifics of construction megaprojects, recommendations for their performance assessment were developed. Issues relating to development arrangement and planning at all management levels (strategic, tactical and operational were considered. Recommendations provided in this paper can be used for the assessment of megaproject performance and formation of KPIs for the participants of the construction process.

  6. Designing and Implementing Performance-Based Career Ladder Plans.

    Science.gov (United States)

    Hawley, Willis D.

    1985-01-01

    Reviews the factors that any teacher motivation plan must incorporate to be effective and outlines 11 principles that should be followed in designing career ladder plans to meet teacher needs, increase teacher competence, and facilitate effective instruction. Warns against potential pitfalls in career ladder plans. (PGD)

  7. Completion of latest ABWR 'SHIKA Unit 2' construction

    International Nuclear Information System (INIS)

    Yamazaki, Tatsuhiro; Yoshimoto, Yuichiro

    2007-01-01

    The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant. (author)

  8. Computer aided system engineering for space construction

    Science.gov (United States)

    Racheli, Ugo

    1989-01-01

    This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

  9. Low-cost satellite mechanical design and construction

    Science.gov (United States)

    Boisjolie-Gair, Nathaniel; Straub, Jeremy

    2017-05-01

    This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.

  10. Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea.

    Science.gov (United States)

    Won, Jongsung; Cheng, Jack C P; Lee, Ghang

    2016-03-01

    Waste generated in construction and demolition processes comprised around 50% of the solid waste in South Korea in 2013. Many cases show that design validation based on building information modeling (BIM) is an effective means to reduce the amount of construction waste since construction waste is mainly generated due to improper design and unexpected changes in the design and construction phases. However, the amount of construction waste that could be avoided by adopting BIM-based design validation has been unknown. This paper aims to estimate the amount of construction waste prevented by a BIM-based design validation process based on the amount of construction waste that might be generated due to design errors. Two project cases in South Korea were studied in this paper, with 381 and 136 design errors detected, respectively during the BIM-based design validation. Each design error was categorized according to its cause and the likelihood of detection before construction. The case studies show that BIM-based design validation could prevent 4.3-15.2% of construction waste that might have been generated without using BIM. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. National Ignition Facility Title II Design Plan

    International Nuclear Information System (INIS)

    Kumpan, S

    1997-01-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed

  12. Planning, design and technological criteria of conventional and nuclear shelters

    International Nuclear Information System (INIS)

    Sadoon, A.S.

    1989-01-01

    The thesis aims to establish a special criteria for building the shelters in two types. The conventional and nuclear, in respect to planning design and technological aspects, and finally establishing a special reference of planning, design and technology for Iraq which can be used when planning or designing a conventional or nuclear shelter. The thesis included four chapters, the first chapter included definition of shelters, and explanation of the effects of all types of weapons on buildings, and the second chapter included definition of planning and design concepts of shelters in its two types and analytical studies for international examples. The third chapter covered definition for technologies of structural, mechanical, electrical and sanitary systems. The fourth chapter included details of a case study in order to approach the results of research which included the conclusions, recommendations, criteria and prospects of planning design and technological aspects. 51 tabs.; 180 figs.; 32 refs.; 15 apps

  13. Design, construction and initial state of the underground openings

    International Nuclear Information System (INIS)

    2010-12-01

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  14. Design, construction and initial state of the underground openings

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  15. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  16. Design and construction of UVSOR-BL4A2 beam line for nano-structure processing

    CERN Document Server

    Takezoe, N; Tanaka, T; Kurosawa, K; Nonogaki, Y; Noda, H; Mekaru, H; Urisu, T

    2001-01-01

    We have designed and constructed a new beam line BL4A2 at UVSOR mainly for nano-structure fabrication based on synchrotron radiation stimulated surface photochemical reactions. In order to obtain high-photon flux, we use white ray beam focused with only one mirror. The beam line is connected with ultra-high vacuum scanning tunneling microscope for in-situ atomic scale observations, low energy electron diffraction and Auger electron spectroscope for surface crystal structure characterization, and photo-stimulated surface reaction chamber. In order to monitor the optical properties with atomic scale, a near field optical microscope is planned to be installed.

  17. Design and construction of UVSOR-BL4A2 beam line for nano-structure processing

    International Nuclear Information System (INIS)

    Takezoe, N.; Yanagida, H.; Tanaka, T.; Kurosawa, K.; Nonogaki, Y.; Noda, H.; Mekaru, H.; Urisu, T.

    2001-01-01

    We have designed and constructed a new beam line BL4A2 at UVSOR mainly for nano-structure fabrication based on synchrotron radiation stimulated surface photochemical reactions. In order to obtain high-photon flux, we use white ray beam focused with only one mirror. The beam line is connected with ultra-high vacuum scanning tunneling microscope for in-situ atomic scale observations, low energy electron diffraction and Auger electron spectroscope for surface crystal structure characterization, and photo-stimulated surface reaction chamber. In order to monitor the optical properties with atomic scale, a near field optical microscope is planned to be installed

  18. Design and Construction of Strain Gauge Interface Pressure ...

    African Journals Online (AJOL)

    Design and Construction of Strain Gauge Interface Pressure Transducer for Measurement of Static and Dynamic Interface Pressure Applied by Pressure Garments and its Relationship to Deep Vein Thrombosis.

  19. Reimagining Game Design: Exploring the Design of Constructible Authentic Representations for Science Reasoning

    Science.gov (United States)

    Holbert, Nathan Ryan

    Video games have recently become a popular space for educational design due to their interactive and engaging nature and the ubiquity of the gaming experience among youth. Though many researchers argue video games can provide opportunities for learning, educational game design has focused on the classroom rather than the informal settings where games are typically played. Educational games have been moderately successful at achieving learning gains on standardized items, but have failed to show improvements on related but distal problems. In this dissertation I develop and assess a new design principle, called constructible authentic representations for creating informal gaming experiences that players will actively draw on when reasoning in formal and real world contexts. These games provide players with opportunities to engage in meaningful construction with components that integrate relevant concepts to create in-game representations that visually and epistemologically align with related tools and representations utilized in the target domain. In the first phase of the dissertation, I observed children playing popular video games to better understand what in-game representations children attend to and how interactions with these representations contribute to intuitive ideas of encountered STEM content. Results from this study fed into the iterative design of two prototype video games, FormulaT Racing and Particles!, intending to give players useful knowledge resources for reasoning about kinematics and the particulate nature of matter respectively. Designed games encourage players to utilize and refine intuitive ideas about target content through the construction of domain relevant representations. To assess the effectiveness of these designs I conducted two studies of children ages 7-14 playing prototype games in informal settings. An analysis of pre- and post-game clinical interviews, domain specific tasks, and video and logging data of gameplay suggests

  20. Processes in construction of failure management expert systems from device design information

    Science.gov (United States)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  1. Construction industry in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Moavenzadeh, F

    1978-01-01

    This paper provides a review of the construction capability available in the developing countries to meet the demand for shelter. It discusses the role of construction in the process of development and its importance to economic growth. It considers the issue facing the growth of a viable indigenous construction industry in the developing world within the context of the activities involved in the creation of constructed facilities--planning, design, contruction and maintenance; it also examines the environment within which the industry has developed. For each construction activity the paper reviews available capabilities, the various resources needed for the development of an indigenous industry, and some possible means of accommodating these needs.

  2. Construction technique for a chemical plant (III)

    International Nuclear Information System (INIS)

    1978-08-01

    This book mentions design of instrumentation and construction for a chemical plant, which deals with the change of instrumentation, construction, choice of material test, construction of thermal insulation work for a chemical plant, about classification and main materials, the problems on construction, painting plan and construction for a chemical plant such as paint and painting, safety and hygiene, cleaning of a chemical plant on the time for washing and decision of the way of washing, start up test for a chemical plant such as introduction of the check, construction and repair.

  3. Future plan of ITER

    International Nuclear Information System (INIS)

    Kitsunezaki, Akio

    1998-01-01

    In cooperation of four countries, Japan, USA, EU and Russia, ITER plan has been proceeding as ''the conceptual design activities'' from 1988 to 1990 and ''the industrial design activities'' since 1992. To construct ITER, the legal and work side of ITER operation has been investigated by four countries. However, their economic conditions have been changed to be wrong. So that, construction of ITER can not begin after end of industrial design activities in 1998. Accordingly, they determined to continue the industrial design activities more three years in order to study low cost options and to test the superconductive model·coil. (S.Y.)

  4. Constructive Synergy in Design Science Research: A Comparative Analysis of Design Science Research and the Constructive Research Approach

    DEFF Research Database (Denmark)

    Piirainen, Kalle; Gonzalez, Rafael A.

    2014-01-01

    Information systems research is focused on creating knowledge which can be applied in organizations. Design science research, which specifically aims at applying existing knowledge to solve interesting and relevant business problems, has been steadily gaining support in information systems research....... However, design science research is not the only design-oriented research framework available. Accordingly, this raises the question of whether there is something to learn between the different approaches. This paper contributes to answering this question by comparing design science research...... with the constructive research approach. The conclusion is that the two approaches are similar and compatible, save for details in practical requirements and partly underlying philosophical assumptions. The main finding that arises from the comparison is, however, that there is a potential problem in claiming knowledge...

  5. Constructive Synergy in Design Science Research: A Comparative Analysis of Design Science Research and the Constructive Research Approach

    DEFF Research Database (Denmark)

    Piirainen, Kalle; Gonzalez, Rafael A.

    2014-01-01

    with the constructive research approach. The conclusion is that the two approaches are similar and compatible, save for details in practical requirements and partly underlying philosophical assumptions. The main finding that arises from the comparison is, however, that there is a potential problem in claiming knowledge......Information systems research is focused on creating knowledge which can be applied in organizations. Design science research, which specifically aims at applying existing knowledge to solve interesting and relevant business problems, has been steadily gaining support in information systems research....... However, design science research is not the only design-oriented research framework available. Accordingly, this raises the question of whether there is something to learn between the different approaches. This paper contributes to answering this question by comparing design science research...

  6. A Duration Prediction Using a Material-Based Progress Management Methodology for Construction Operation Plans

    Directory of Open Access Journals (Sweden)

    Yongho Ko

    2017-04-01

    Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.

  7. 41 CFR 101-26.506 - Interior planning and design services.

    Science.gov (United States)

    2010-07-01

    ... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...

  8. Advanced plant engineering and construction of Japanese ABWRs

    International Nuclear Information System (INIS)

    Gotoh, N.; Sumikawa, J.; Yoshida, N.; Yoshida, M.

    1998-01-01

    Remarkable improvement has been made in recent nuclear power plant design and construction in Japan. These many improved engineering technologies has been made a good use in the lately commercial operated two world's first 1,356MWe ABW's (Advanced Boiling Water Reactors), and made a great contribution to the smooth progress and the completion of a highly reliable plant construction. Especially, two engineering technologies, (1), three-dimensional computer aided design system through engineering data-base, and (2), large scale modularising construction method, have been successfully applied as the integrated engineering technologies of the plant construction. And two integrated reviews, 'integrated design review, confirmation of new and changed design and prevention of failure recurrence' in the design stage, and 'constructing plant review' at the site, have been widely and systematically conducted as a link in the chain of steady reliability improvement activities. These advanced and/or continuous and steady technologies are one of most important factors for high reliability through the entire lifetime of a nuclear plant, including planning, design, construction, operation and maintenance stages. (author)

  9. Design and Construction of Onkalo

    International Nuclear Information System (INIS)

    Vira, Juhani

    2014-01-01

    The principal objectives set to the ONKALO design were: 1- to enable the underground characterization of the actual host rock of the repository, and, barring unexpected negative results, the final confirmation of the site suitability; 2- to enable in situ testing and demonstration of repository technologies and work processes in realistic conditions, with the main constraints that it should be built in a way that the characteristics of the host rock important for long term safety were not compromised, and it should be built as if it were a nuclear facility. The first of the constraints came directly from the regulations. The second constraint had particular implications to quality management, safety classification of systems and structures, application of safeguards. Posiva had applied an ISO 9001 quality assurance system for all its previous R and D work, but now the QA system needed to be extended to the design and construction work and it should comply with the regulatory QA requirements. However, on the details of QA the existing YVL Guide on quality assurance largely referred to IAEA's safety guides. What came up handy at that time was a comparison, made by IAEA, between ISO based QA and IAEA's safety guides. It showed that the differences were actually small and comprised mainly of the graded approach based on safety meaning, and the role of a responsible facility manager, which were not included in the ISO 9001 based QA system. Posiva decided to continue with the ISO based quality management revamped with additional features from IAEA safety guidelines. This paper describes the management of Onkalo design and construction, and the current experience notably concerning some control procedures implemented for long-term safety

  10. Next Generation CANDU: Conceptual Design for a Short Construction Schedule

    International Nuclear Information System (INIS)

    Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville

    2002-01-01

    Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

  11. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  12. Reduction of construction periods of PWRs by optimization of detailed sequence planning

    International Nuclear Information System (INIS)

    Stocker, W.; Leverenz, R.

    1991-01-01

    The construction of PWR's is an enterprise with high investment costs, in total up to three billion US$ and with long construction periods of five years and more. Besides the results reached by the intensive standardization, a further reduction of the construction period is possible by optimization of detailed sequence planning and interfaces of work units. During the execution of the three German Convoy plants ISAR 2, EMSLAND and NECKARWESTHEIM 2, the contractual construction periods were shortened between 4 and 8 months. These reductions were reached after individual investigations by measures like advanced finishing work activities; erection of an increased amount of prefabricated pipings; rearrangement of erection sequences; overlapping of piping erection and electrical installation; reduction of plant commissioning period. All these measures support directly the reduction of the total investment cost of a plant, as already demonstrated by the Convoy plants. (author). 8 figs

  13. Stages in planning and construction of the Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Pracht, F.

    1975-01-01

    On October 23, 1972, RWE gave a letter of intent and on January 9, 1973 an order for the construction of a nuclear power plant on a turn-key basis to the consortium of BBC, BBR and Hochtief. The power plant in question was the Muelheim-Kaerlich nuclear power station with a pressurized-water reactor of a gross efficiency of 1,295 MWe. After considerable delay of the project, the first building permit was issued to the builder-owner on January 15, 1975, and the constructional work on the building site started immediately afterwards. As the planning and constructional work has so far been carried out according to schedule and the consortium intends to keep the effects of the belated license as small as possible, the start-off of the plant will probably be in summer 1979 if the constructional work is not interrupted. (orig./AK) [de

  14. Building a Roll-Off Roof Observatory A Complete Guide for Design and Construction

    CERN Document Server

    Hicks, John

    2009-01-01

    Almost every practical astronomer who takes the pursuit to its second level aspires to a fixed, permanent housing for his telescope, permitting its rapid and comfortable use and avoiding hours of setting-up time for each observing session. A roll-off roof observatory is the simplest and by far the most popular observatory design for today’s practical astronomers. Building a Roll-off Roof Observatory will help you decide whether to embark on the venture and will certainly provoke your enthusiasm for the project. The author, both an amateur astronomer and professional landscape architect, answers many of the common questions asked around observatory construction covering the following topics: Site planning, zoning, and by-law requirements common to most states, towns and municipalities Opportunities for locating the observatory Tailoring the observatory for your particular use Tools and structural components required to build it Variations in footing design to suit your soil conditions Variations possible in ...

  15. RCC-F: Design and construction rules for PWR fire protection systems

    International Nuclear Information System (INIS)

    2013-01-01

    The RCC-F code defines the rules for designing, building and installing the fire protection systems used to manage the nuclear hazards inherent in the outbreak of a fire inside the facility and thereby control the fundamental nuclear functions. The code provides fire protection recommendations in terms of: the industrial risk (loss of assets and/or operation), personnel safety, the environment. The code is divided into five main sections: generalities, design safety principles, fire protection design bases, construction provisions, rules for installing the fire protection components and equipment. The RCC-F code is available as an ETC-F version specifically for EPR projects (European pressurized reactor). Contents of the 2013 edition of the ETC-F code: Volume A - Generalities: Structure of ETC-F general points, documentation (in progress), chapter (provision) quality assurance; Volume B - Design safety principles: design nuclear safety principles; Volume C - Fire protection design bases: fire protection design bases; Volume D - Construction provisions: construction provisions; Volume E - Installation rules for fire protection: rules for installing the fire protection, components and equipment

  16. Integration of packaging design and planning into transportation

    International Nuclear Information System (INIS)

    Jarrell, R.F.

    1993-01-01

    In the past, numerous programs, projects, and design concepts for packaging and materials production have taken place without all the principal participants being involved in the up-front planning process. Many major facilities and packagings have been designed without the involvement of Transportation professionals. Unfortunately, Transportation has been overlooked and in most cases is a critical element that should have been included in the Planning process. (J.P.N.)

  17. Design Solutions for Sustainable Construction of Pre Engineered Steel Buildings

    Directory of Open Access Journals (Sweden)

    Muhammad Umair Saleem

    2018-05-01

    Full Text Available Sustainable construction of ecofriendly infrastructure has been the priority of worldwide researchers. The induction of modern technology in the steel manufacturing industry has enabled designers to get the desired control over the steel section shapes and profiles resulting in efficient use of construction material and manufacturing energy required to produce these materials. The current research study is focused on the optimization of steel building costs with the use of pre-engineered building construction technology. Construction of conventional steel buildings (CSB incorporates the use of hot rolled sections, which have uniform cross-section throughout the length. However, pre-engineered steel buildings (PEB utilize steel sections, which are tailored and profiled based on the required loading effects. In this research study, the performance of PEB steel frames in terms of optimum use of steel sections and its comparison with the conventional steel building is presented in detail. A series of PEB and CSB steel frames is selected and subjected to various loading conditions. Frames were analyzed using Finite Element Based analysis tool and design was performed using American Institute of Steel Construction design specifications. Comparison of the frames has been established in terms of frame weights, lateral displacements (sway and vertical displacements (deflection of the frames. The results have clearly indicated that PEB steel frames are not only the most economical solution due to lesser weight of construction but also have shown better performance compared to CSB frames.

  18. NASA Lunar Mining and Construction Activities and Plans

    Science.gov (United States)

    Sanders, Gerald B.; Larson, William E.; Sacksteder, Kurt R.

    2009-01-01

    The Space Exploration Policy enacted by the US Congress in 2005 calls for the US National Aeronautics and Space Administration (NASA) to implement a sustained and affordable human and robotic program to explore the solar system and beyond; Extend human presence across the solar system, starting with a human return to the Moon by the year 2020, in preparation for human exploration of Mars and other destinations; Develop the innovative technologies, knowledge, and infrastructures both to explore and to support decisions about the destinations for human exploration; and Promote international and commercial participation in exploration to further U.S. scientific, security, and economic interests. In 2006, NASA released the Lunar Architecture Study, which proposed establishing a lunar Outpost on the Moon with international participation to extend human presence beyond Earth's orbit, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere. The establishment of sustained human presence on the Moon for science and exploration combines the design, integration, and operation challenges experienced from both the short Apollo lunar missions and the build-up and sustained crew operations of the International Space Station (ISS). Apollo experience reminds developers and mission planners that hardware must operate under extremely harsh environmental and abrasive conditions and every kilogram of mass and payload must be critical to achieve the mission s objectives due to the difficulty and cost of reaching the lunar surface. Experience from the ISS reminds developers and mission planners that integration of all hardware must be designed and planned from the start of the program, operations and evolution of capabilities on a continuous basis are important, and long-term life-cycle costs and logistical needs are equally or more important than minimizing early development and test costs. Overarching all of this is

  19. Design process for a repository - KBS-3 case

    International Nuclear Information System (INIS)

    Svemar, C.

    1995-01-01

    This paper deals with the design process for the Swedish (generic) repository design KBS-3. The repository may have a spiral access ramp, access shafts, or straight access ramps. Galleries lead from a central service area to a small spent fuel storage area, a larger main spent fuel storage area, and a disposal area for other nuclear waste. This, or any, design has to be planned through three stages of layout and design, viz. feasibility study, preliminary planning, and architectural design, followed by detailed planning, and then planning of excavation and construction. Decisions on final design have to wait until construction is imminent, and all the rock data are available. This means that different sections of the repository may be at different planning stages at any one time. In the last stage, the plan of the disposal holes depends on detailed coring results, because a hole will not be bored where there is a fracture. 3 refs., 1 tab., 3 figs

  20. Identifying Indicators Related to Constructs for Engineering Design Outcome

    Science.gov (United States)

    Wilhelmsen, Cheryl A.; Dixon, Raymond A.

    2016-01-01

    This study ranked constructs articulated by Childress and Rhodes (2008) and identified the key indicators for each construct as a starting point to explore what should be included on an instrument to measure the engineering design process and outcomes of students in high schools that use the PLTW and EbDTM curricula in Idaho. A case-study design…

  1. Design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Meiswinkel, Ruediger; Meyer, Julian; Schnell, Juergen

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply. Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overview from approval aspects given by nuclear and construction law, with special attention to the interface between plant and construction engineering, to a building structure classification. All life cycle phases are considered, with the primary focus on execution. Accidental actions on structures, the safety concept and design and fastening systems are exposed to a particular treatment. Selected chapters of the German concrete yearbook ''Beton-Kalender'' are now available in English. The new English BetonKalender Series delivers internationally useful engineering expertise and industrial know-how from Germany.

  2. Design and construction of the ZEUS barrel calorimeter

    International Nuclear Information System (INIS)

    Repond, J.

    1990-01-01

    The mechanical design and construction techniques of the barrel calorimeter for the ZEUS detector are presented. The calorimeter uses alternate layers of depleted uranium and scintillator with one radiation length sampling. The unit cell has e/h = 1 which yields an optimal energy resolution for hadronic jets. We discuss the placing of the structural components and cracks between modules. Details of the construction and assembly effort needed to realize the total calorimeter are reported. 4 figs., 1 tab

  3. Constructing sites at a large scale - towards new design (education) methods

    DEFF Research Database (Denmark)

    Braae, Ellen Marie; Tietjen, Anne

    2010-01-01

    of the design disciplines within the development of our urban landscapes. At the same time, urban and landscape designers are confronted with new methodological problems. Within a strategic transformation perspective the formulation of the design problem or brief becomes an integrated part of the design process......Since the 1990s the regional scale has regained importance in urban and landscape design. In parallel, the focus in design tasks has shifted from master plans for urban extension to strategic urban transformation projects. The current paradigm of planning by projects reinforces the role....... This paper discusses new design (education) methods based on a relational concept of urban sites and design processes using the actor-network-theory as theoretical frame....

  4. Library Services and Construction Act. Long Range Plan, 1982-1986 Updates.

    Science.gov (United States)

    Seidenberg, Edward

    This 1982-86 update to long-range planning designed to continue the improvement of library facilities and services in Texas includes a review of how the plan developed, the various environmental factors affecting library operations, the present development of libraries, information needs and approaches to satisfying those needs, and methods for…

  5. Design and construction of the low-level liquid waste treatment system

    International Nuclear Information System (INIS)

    Baker, M.N.; Mateer, W.E.; Metzler, G.H.; Reeves, S.R.; Rickettson, D.J.

    1989-03-01

    This report describes the design and construction of the Low-Level Liquid Waste Treatment System (LWTS). The LWTS is part of a system that will prepare High-Level Radioactive Waste for solidification in glass. This preparation includes removal of water and salts from the stored waste. The topics addressed are: the design objective to reuse the Process Building to contain LWTS, the special considerations that arise when building a new system inside a decontaminated facility, interface to existing plant systems, phased construction, and construction testing. 8 refs., 24 figs

  6. 4kV Electrostatic Accelerator Construction

    International Nuclear Information System (INIS)

    Fontaine, M.; Montanno, Luis M.

    2013-01-01

    We design and construct a small one meter linear electron accelerator. It can reach energy up to 4KeV. As a first step we put it in work via electrostatic voltage difference and verifying the acceleration of the electrons with an electrometer. Our plans in the future refer to construct another accelerator of bigger energy and type, for instance, a linear one with resounding cavities. (Author)

  7. Solar building construction. Town planning - construction planning. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schempp, D.; Krampen, M.; Moellring, F.

    1994-01-01

    The book discusses the problems of solar energy use under the following aspects: Town planing; Typology of green solar architecture; Typologie of solar architecture; Vegetation in green solar architecture; Planning and simulation; Building materials; Ventilation, illumination; Research projects. (HW) [de

  8. design, construction and performance evaluation of multiple casting

    African Journals Online (AJOL)

    eobe

    time taken for solidification, plays an important role in the casting. There should not ... Keywords: Design, Construction, Multiple casting machine, Compo Casting operation. 1. Introduction .... metal and pathway channel pipe with heater is used.

  9. Design of chemical plant

    International Nuclear Information System (INIS)

    Lee, Dong Il; Kim, Seung Jae; Yang, Jae Ho; Ryu, Hwa Won

    1993-01-01

    This book describes design of chemical plant, which includes chemical engineer and plan for chemical plant, development of chemical process, cost engineering pattern, design and process development, general plant construction plan, project engineering, foundation for economy on assets and depreciation, estimation for cost on capital investment and manufacturing cost, design with computers optimal design and method like fluid mechanics design chemical device and estimation for cost, such as dispatch of material and device writing on design report and appendixes.

  10. Radiotherapy facilities: Master planning and concept design considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals.

  11. Radiotherapy facilities: Master planning and concept design considerations

    International Nuclear Information System (INIS)

    2014-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  12. Design and construction of a 1-MJ DPF

    International Nuclear Information System (INIS)

    DelMedico, S.; Javedani, J.; Wimmer, R.

    1994-01-01

    A MJ-Class Dense Plasma Focus (DPF) facility, is being designed to develop the technology needed for plasma focus-type magnetoplasmadynamic (MPD) thrusters. The facility will be capable of studying various commercial applications of the plasma focus also, such as soft x-ray lithography. The facility will be located at the University of Illinois, Champaign/Urbana campus. The ultimate objective is to demonstrate the feasibility and attractiveness of the plasma focus MPD concept for very high specific-impulse space propulsion. Studies include scaling experiments up to and including the 1-MJ level and experiments using a gas-injected plasma focus, such as required in the hard vacuum environment of space. The plasma focus thruster differs from the conventional MPD in that it is capable of generating additional thrust from fusion energy released during the pinch phase of the arc run-down. The proposed 1-MJ facility would enable studies of these concepts at a meaningful energy level. If the results are encouraging, as expected, a next step would be to construct a prototype thruster for further studies, including space qualifications. In addition to thruster studies, the MJ-class facility offers considerable flexibility for the study of a variety of scientific applications requiring an intense, pulsed, radiation source. Examples of such uses range from studies of radiation hardening of electronics to transmutation of radioactive wastes. Consequently, upon completion, it is planned to invite outside users to access the MJ-facility in the time that remains after mainline research. A key objective is to establish the DPF facility as a National User's Facility. To accomplish this, it is planned to establish an advisory committee for use of the facility next year and host a workshop for potential users

  13. How to Construct a Mixed Methods Research Design

    OpenAIRE

    Schoonenboom, Judith; Johnson, R. Burke

    2017-01-01

    This article provides researchers with knowledge of how to design a high quality mixed methods research study. To design a mixed study, researchers must understand and carefully consider each of the dimensions of mixed methods design, and always keep an eye on the issue of validity. We explain the seven major design dimensions: purpose, theoretical drive, timing (simultaneity and dependency), point of integration, typological versus interactive design approaches, planned versus emergent desig...

  14. Social marketing to plan a fall prevention program for Latino construction workers.

    Science.gov (United States)

    Menzel, Nancy N; Shrestha, Pramen P

    2012-08-01

    Latino construction workers experience disparities in occupational death and injury rates. The Occupational Safety and Health Administration funded a fall prevention training program at the University of Nevada, Las Vegas in response to sharp increases in fall-related accidents from 2005 to 2007. The grant's purpose was to improve fall protection for construction workers, with a focus on Latinos. This study assessed the effectiveness of social marketing for increasing fall prevention behaviors. A multi-disciplinary team used a social marketing approach to plan the program. We conducted same day class evaluations and follow-up interviews 8 weeks later. The classes met trainee needs as evidenced by class evaluations and increased safety behaviors. However, Spanish-speaking Latinos did not attend in the same proportion as their representation in the Las Vegas population. A social marketing approach to planning was helpful to customize the training to Latino worker needs. However, due to the limitations of behavior change strategies, future programs should target employers and their obligation to provide safer workplaces. Copyright © 2012 Wiley Periodicals, Inc.

  15. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  16. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS... BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  17. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  18. Design and construction of a fast critical facility

    International Nuclear Information System (INIS)

    Kato, W.Y.; Dates, L.R.

    1962-01-01

    Design and construction of a fast critical facility. In a fast-power-reactor development programme, a critical facility is found to be a highly useful tool to ascertain calculational techniques, to verify neutron cross-section sets, and to obtain integral reactor-physics parameters necessary for the nuclear design of a power system. Since it is primarily a physics instrument, the design of a fast critical facility itself poses a number of different problems not found in the design of a power reactor. In addition to usual questions of site, containment, core design and instrumentation , there arise such problems as: how to obtain a large degree of flexibility consistent with safety, the determination of the size and type of facility to meet the experimental physics requirements, the determination of the number and location of control and safety rods minimizing perturbation effects and the specification of the reproducibility of control rods and other movable components to obtain the accuracy required in reactivity measurements. These are some of the problems which are discussed in this paper based on recent experience at the Argonne National Laboratory which has under construction a fast critical facility, ZPR-VI at its Lemont, Illinois site for fast-reactor-physics studies. The ZPR-VI is a movable half- or split-table-type machine similar to ZPR-III. It has a matrix about two and a half times the volume of the earlier machine and will be used to investigate the physics of large, highly dilute, metal and cermet, unmoderated and partially moderated systems having core volumes up to about 1500 l. A detailed description of the ZPR-VI with a discussion on the criteria used in the design of its various components from the point of view of reactor physics is presented. In addition, such topics as management and operating procedures, potential hazards during operation, experimental techniques to be used and construction costs are also included. (author) [fr

  19. Role of civil engineers in design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Sivathanu Pillai, C.

    2015-01-01

    Nuclear energy remains an important element in India's energy mix for sustaining rapid economic growth. In the Indian energy scenario projections for the future, nuclear power through fast reactors has been considered as an important component. Fast reactors are also planned to be built in the medium term to burn minor actinides as means of reducing the burden of radioactive waste management. Nuclear power in India provides 3% of the electricity generated in the country now; it is estimated to go up to 25% by 2050. India has a special interest in developing fast breeder reactors and use of thorium as a source of energy as it has one of the largest reserves of thorium. Nuclear industry always provides challenging works to civil engineers. From geotechnical investigation, structural analysis, design, construction and to material developments and provides unique opportunity for excellence

  20. Waste Encapsulation and Storage Facility (WESF) Design Reconstitution Plan

    International Nuclear Information System (INIS)

    HERNANDEZ, R.

    1999-01-01

    The purpose of Design Reconstitution is to establish a Design Baseline appropriate to the current facility mission. The scope of this plan is to ensure that Systems, Structures and Components (SSC) identified in the WESF Basis for Interim Operation (HNF-SDWM-BIO-002) are adequately described and documented, in order to support facility operations. In addition the plan addresses the adequacy of selected Design Topics which are also crucial for support of the facility Basis for Interim Operation (BIO)

  1. Final design and construction issues of the TAPIRO epithermal column

    International Nuclear Information System (INIS)

    Burn, K.W.; Casalini, L.; Nava, E.; Tinti, R.; Martini, S.; Mondini, D.; Rosi, G.

    2006-01-01

    The construction of the epithermal column for clinical trials at the 5 kW fast reactor TAPIRO (ENEA, Casaccia, Italy) has been completed, the experimental bunker in the reactor hall has been designed and the beam characterisation will shortly be underway. As has been reviewed at the last two ICNCT conferences, the low power of the neuron source and the relatively distant patient position outside the reactor shield led to a column design with certain characteristics. One consequence is the employment of a collimator containing lead of high purity with the resultant problems of mechanical construction. Another is the substantial neutron leakage from the column outside the aperture into the experimental bunker. Furthermore the absence of a gamma shield has led to an electron dose to the skin. This is resolved with an electron shield of aluminium. Here the construction and final design issues are discussed and the state of the project is presented. (author)

  2. Look Ahead: Long-Range Learning Plans

    Science.gov (United States)

    Weinstein, Margery

    2010-01-01

    Faced with an unsteady economy and fluctuating learning needs, planning a learning strategy designed to last longer than the next six months can be a tall order. But a long-range learning plan can provide a road map for success. In this article, four companies (KPMG LLP, CarMax, DPR Construction, and EMC Corp.) describe their learning plans, and…

  3. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  4. Quality planning for major plant design modifications

    International Nuclear Information System (INIS)

    Dulee, R.J.

    1988-01-01

    This paper reviews the approach and activities undertaken by Public Service Electric and Gas Company's (PSE and G's) nuclear quality assurance (QA) department to support major plant design modifications conducted during refueling outages at Salem Generating Station. It includes the planning and implementation of quality plans developed to provide both QA and quality control (QC) coverage of modification performed by contracted service organizations

  5. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

  8. Design and construction of the Fuels and Materials Examination Facility

    International Nuclear Information System (INIS)

    Burgess, C.A.

    1979-01-01

    Final design is more than 85 percent complete on the Fuels and Materials Examination Facility, the facility for post-irradiation examination of the fuels and materials tests irradiated in the FFTF and for fuel process development, experimental test pin fabrication and supporting storage, assay, and analytical chemistry functions. The overall facility is generally described with specific information given on some of the design features. Construction has been initiated and more than 10% of the construction contracts have been awarded on a fixed price basis

  9. Swarming Robot Design, Construction and Software Implementation

    Science.gov (United States)

    Stolleis, Karl A.

    2014-01-01

    In this paper is presented an overview of the hardware design, construction overview, software design and software implementation for a small, low-cost robot to be used for swarming robot development. In addition to the work done on the robot, a full simulation of the robotic system was developed using Robot Operating System (ROS) and its associated simulation. The eventual use of the robots will be exploration of evolving behaviors via genetic algorithms and builds on the work done at the University of New Mexico Biological Computation Lab.

  10. Minimization In Digital Design As A Meta-Planning Problem

    Science.gov (United States)

    Ho, William P. C.; Wu, Jung-Gen

    1987-05-01

    In our model-based expert system for automatic digital system design, we formalize the design process into three sub-processes - compiling high-level behavioral specifications into primitive behavioral operations, grouping primitive operations into behavioral functions, and grouping functions into modules. Consideration of design minimization explicitly controls decision-making in the last two subprocesses. Design minimization, a key task in the automatic design of digital systems, is complicated by the high degree of interaction among the time sequence and content of design decisions. In this paper, we present an AI approach which directly addresses these interactions and their consequences by modeling the minimization prob-lem as a planning problem, and the management of design decision-making as a meta-planning problem.

  11. 25 CFR 170.415 - What is pre-project planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall...

  12. The VolturnUS 1:8 Floating Wind Turbine: Design, Construction, Deployment, Testing, Retrieval, and Inspection of the First Grid-Connected Offshore Wind Turbine in US

    Energy Technology Data Exchange (ETDEWEB)

    Dagher, Habib [Univ. of Maine, Orono, ME (United States); Viselli, Anthony [Univ. of Maine, Orono, ME (United States); Goupee, Andrew [Univ. of Maine, Orono, ME (United States); Kimball, Richard [Maine Maritime Academy, Castine, ME (United States); Allen, Christopher [Univ. of Maine, Orono, ME (United States)

    2017-08-15

    Volume II of the Final Report for the DeepCwind Consortium National Research Program funded by US Department of Energy Award Number: DE-EE0003278.001 summarizes the design, construction, deployment, testing, numerical model validation, retrieval, and post-deployment inspection of the VolturnUS 1:8-scale floating wind turbine prototype deployed off Castine, Maine on June 2nd, 2013. The 1:8 scale VolturnUS design served as a de-risking exercise for a commercial multi-MW VolturnUS design. The American Bureau of Shipping Guide for Building and Classing Floating Offshore Wind Turbine Installations was used to design the prototype. The same analysis methods, design methods, construction techniques, deployment methods, mooring, and anchoring planned for full-scale were used. A commercial 20kW grid-connected turbine was used and was the first offshore wind turbine in the US.

  13. 46 CFR 50.20-30 - Alternative materials or methods of construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Alternative materials or methods of construction. 50.20... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of construction. (a) When new or alternative procedures, designs, or methods of construction are submitted for...

  14. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  15. 40 CFR 125.99 - What are approved design and construction technologies?

    Science.gov (United States)

    2010-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following....99 was suspended. ...

  16. Design of methodology for incremental compiler construction

    Directory of Open Access Journals (Sweden)

    Pavel Haluza

    2011-01-01

    Full Text Available The paper deals with possibilities of the incremental compiler construction. It represents the compiler construction possibilities for languages with a fixed set of lexical units and for languages with a variable set of lexical units, too. The methodology design for the incremental compiler construction is based on the known algorithms for standard compiler construction and derived for both groups of languages. Under the group of languages with a fixed set of lexical units there belong languages, where each lexical unit has its constant meaning, e.g., common programming languages. For this group of languages the paper tries to solve the problem of the incremental semantic analysis, which is based on incremental parsing. In the group of languages with a variable set of lexical units (e.g., professional typographic system TEX, it is possible to change arbitrarily the meaning of each character on the input file at any time during processing. The change takes effect immediately and its validity can be somehow limited or is given by the end of the input. For this group of languages this paper tries to solve the problem case when we use macros temporarily changing the category of arbitrary characters.

  17. Predicting sugar-sweetened behaviours with theory of planned behaviour constructs: Outcome and process results from the SIPsmartER behavioural intervention

    Science.gov (United States)

    Zoellner, Jamie M.; Porter, Kathleen J.; Chen, Yvonnes; Hedrick, Valisa E.; You, Wen; Hickman, Maja; Estabrooks, Paul A.

    2017-01-01

    Objective Guided by the theory of planned behaviour (TPB) and health literacy concepts, SIPsmartER is a six-month multicomponent intervention effective at improving SSB behaviours. Using SIPsmartER data, this study explores prediction of SSB behavioural intention (BI) and behaviour from TPB constructs using: (1) cross-sectional and prospective models and (2) 11 single-item assessments from interactive voice response (IVR) technology. Design Quasi-experimental design, including pre- and post-outcome data and repeated-measures process data of 155 intervention participants. Main Outcome Measures Validated multi-item TPB measures, single-item TPB measures, and self-reported SSB behaviours. Hypothesised relationships were investigated using correlation and multiple regression models. Results TPB constructs explained 32% of the variance cross sectionally and 20% prospectively in BI; and explained 13–20% of variance cross sectionally and 6% prospectively. Single-item scale models were significant, yet explained less variance. All IVR models predicting BI (average 21%, range 6–38%) and behaviour (average 30%, range 6–55%) were significant. Conclusion Findings are interpreted in the context of other cross-sectional, prospective and experimental TPB health and dietary studies. Findings advance experimental application of the TPB, including understanding constructs at outcome and process time points and applying theory in all intervention development, implementation and evaluation phases. PMID:28165771

  18. Ship Design and Construction. An Integrated University Course

    DEFF Research Database (Denmark)

    Andersen, Poul; Jensen, Jørgen Juncher

    1996-01-01

    This paper describes an integrated course in design and construction of merchant ships taught at the Department of Naval Architecture andOffshore Engineering, the Technical University of Denmark. During the course, the students make a preliminary design of a ship of selected type and also design...... its engine room. The teaching combines lectures with laboratory work at the drawing tables and computer terminals. During the summer holiday, sea time on board ships of the relevant types are offered. Experienced naval architects from shipyards and ship consultancies give lectures and instructions...

  19. Project plan for PACS networking construction and cabling

    International Nuclear Information System (INIS)

    Luo Min; Wang Xiaolin; Luo Song; Lei Wenyong; Wang Xuejian; Wen Hongyue; Wu Hongxing

    2002-01-01

    Objective: To meet the networking requirement of the heave data flow, load balance, and potential networking storm during expanding the application of PACS. Methods: Intel Net Structure 480T Giga Switch was used as main switch and connected to each building by optical channel at 1 Giga speed to archive 100 MB/s to each port. At the same time, the in dependence of the original networking construction was physically kept. The layer 3 and 4 switchers was used as load balance to reduce the heavy load of the networking, and all the cabling for PACS used the super CAT5 along with the Intel Net Structure 1520 to prepare for the potential networking storm. Results: An advanced intranet was set up to fully meet the high standard requirement of PACS. The good foundation for upgrading the whole networking system to 1 Giga application was built for realized share and transmission of image, information, and patient data within the hospital. The base was established for the standardized management of the hospital. Conclusion: Good planning is the 1 st step in setting up PACS and the equipment are the platform to run PACS and all kinds of HIS. The networking construction is the foundation of e-hospitals

  20. Design, Construction and Testing of an Uninterruptible Power ...

    African Journals Online (AJOL)

    Design, Construction and Testing of an Uninterruptible Power Supply of 300 Watts Capacity. ... is transformed using the transformer to 240v a.c., 50Hz. The system also has in-built voltage reversal protection, automatic change-over and battery ...

  1. Design and construction of synthetic microbial consortia in China

    Directory of Open Access Journals (Sweden)

    Ming-Zhu Ding

    2016-12-01

    Full Text Available The rapid development of synthetic biology enables the design, construction and optimization of synthetic microbial consortia to achieve specific functions. In China, the “973” project-“Design and Construction of Microbial Consortia” was funded by the National Basic Research Program of China in January 2014. It was proposed to address the fundamental challenges in engineering natural microbial consortia and reconstructing microbial consortia to meet industrial demands. In this review, we will introduce this “973” project, including the significance of microbial consortia, the fundamental scientific issues, the recent research progresses, and some case studies about synthetic microbial consortia in the past two and a half years.

  2. 49 CFR 195.132 - Design and construction of aboveground breakout tanks.

    Science.gov (United States)

    2010-10-01

    ...) or more of liquefied petroleum gas (LPG) must be designed and constructed in accordance with API... constructed in accordance with API Standard 650. (4) High pressure steel tanks (i.e., internal gas or vapor...

  3. Interstitial vaginal needle implantation in gynecological tumors : design and construction of applicator

    International Nuclear Information System (INIS)

    Kang, Seung Hee; Chun, Mi Son; Kang, Hae Jin; Jung, Chil; Son, Jeong Hyae

    1998-01-01

    It is not a simple task to achieve the ideal isodose curve with a standard vaginal applicator or single plane needle impant in the paravaginal tissue when primary or recurrent gynecological neoplasms(cervical cancers, vaginal cancers and vulvar cancers) are treated as a boost following external beam radiotherapy. The authors introduce the development and construction of a simple, inexpensive, customized applicator for volume implant to maximize the radiation dose to the tumor while minimizing the dose to the rectum and the bladder. Nine patients underwent Ir-192 transperineal interstitial implantation for either recurrent(5 cases)or primary(3 cases) cervical cancers or primary vaginal cancer(1 case) between August 1994 and February 1998 at Ajou university hospital. First 3 cases were performed with a single plane implant guided by digital palpation. Because of inadequate isodose coverage in the tumor volume in first 3 cases, we designed and constructed interstitial vaginal applicator for volume implant to mprove tumor dose distribution and homogeneity while sparing the surrounding normal tissue. Our applicators consist of vaginal obturator and perineal template that made of the clear acrylamide and dental mold material(Provil). The applicators were customized individually according to the tumor size and its location. Both HDR and LDR irradiation were given with these applicators accomodating 6 Fr needles(Microselectron, Nucletron). The pretreatment planning prior to actual implant was performed whenever possible. Needles can be inserted easily and evenly into the tumor volume through the holes of templates, requiring less efforts and time for the implant prodecure. Our applicators made of materials available from commercial vendors. These have an advantage that require easy procedure, and spend relatively short time to construct. Also it was possible to fabricate applicators to individualize according to the tumor size and its location and to achieve the ideal

  4. IAEA Guidance for Safeguards Implementation in Facility Design and Construction

    International Nuclear Information System (INIS)

    Sprinkle, J.; Hamilton, A.; Poirier, S.; Catton, A.; Ciuculescu, C.; Ingegneri, M.; Plenteda, R.

    2015-01-01

    One of the IAEA's statutory objectives is to seek to accelerate and enlarge the contribution of nuclear energy to peace, health and prosperity throughout the world. One way the IAEA works to achieve this objective is through the publication of technical series that can provide guidance to Member States. These series include the IAEA Services Series, the IAEA Safety Standard Series, the IAEA Nuclear Security Series and the IAEA Nuclear Energy Series. The Nuclear Energy Series is comprised of publications designed to encourage and assist research and development on, and practical application of, nuclear energy for peaceful purposes. This includes guidance to be used by owners and operators of utilities, academia, vendors and government officials. The IAEA has chosen the Nuclear Energy Series to publish guidance for States regarding the consideration of safeguards in nuclear facility design and construction. Historically, safeguards were often applied after a facility was designed or maybe even after it was built. However, many in the design and construction community would prefer to include consideration of these requirements from the conceptual design phase in order to reduce the need for retro-fits and modifications. One can then also take advantage of possible synergies between safeguards, security, safety and environmental protection and reduce the project risk against cost increments and schedule slippage. The IAEA is responding to this interest with a suite of publications in the IAEA Nuclear Energy Series, developed with the assistance of a number of Member State Support Programmes through a joint support programme task: · International Safeguards in Nuclear Facility Design and Construction (NP-T-2.8, 2013), · International Safeguards in the Design of Nuclear Reactors (NP-T-2.9, 2014), · International Safeguards in the Design of Spent Fuel Management (NF-T-3.1, tbd), · International Safeguards in the Design of Fuel Fabrication Plants (NF-T-4.7, tbd

  5. Safety-related concrete structure design and construction of Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Morishita, Hideki; Munakata, Yoshinari; Togashi, Akihito

    2003-01-01

    The Rokkasho Reprocessing Plant of the Japan Nuclear Fuel Co. Ltd., is a facility to reprocess remained uranium without firing and newly formed plutonium contained in spent fuels used at the nuclear power stations, to produce fuels to be repeatedly used. Constructions in this facility has some characteristics shown as follows: 1) radiation shielding and seismic isolated functions like those at the nuclear power plants, 2) reduction of wall thickness based on partially using heavy concrete at walls required for radiation shielding, 3) protective design against fly-coming matters such as aircrafts, 4) construction period reduction based on winter construction and large scale block engineering. Here were described characteristics of designs on radiation shielding, seismic isolated and fly-coming matters protection construction engineering and quality control on concrete. (G.K.)

  6. Utilization of building information modeling in infrastructure’s design and construction

    Science.gov (United States)

    Zak, Josef; Macadam, Helen

    2017-09-01

    Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.

  7. Design ampersand construction innovations of the defense waste processing facility

    International Nuclear Information System (INIS)

    McKibben, J.M.; Pair, C.R.; Bethmann, H.K.

    1990-01-01

    Construction of the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) is essentially complete. The facility is designed to convert high-level radioactive waste, now contained in large steel tanks as aqueous salts and sludge, into solid borosilicate glass in stainless steel canisters. All processing of the radioactive material and operations in a radioactive environment will be done remotely. The stringent requirements dictated by remote operation and new approaches to the glassification process led to the development of a number of first-of-a-kind pieces of equipment, new construction fabrication and erection techniques, and new applications of old techniques. The design features and construction methods used in the vitrification building and its equipment were to accomplish the objective of providing a state-of-the-art vitrification facility. 3 refs., 10 figs

  8. Global or local construction materials for post-disaster reconstruction? Sustainability assessment of 20 post-disaster shelter designs.

    Science.gov (United States)

    Zea Escamilla, E; Habert, G

    2015-09-01

    This data article presents the life cycle inventories of 20 transitional shelter solutions. The data was gathered from the reports 8 shelter designs [1]; 10 post-disaster shelter designs [2]; the environmental impact of brick production outside of Europe [3]; and the optimization of bamboo-based post-disaster housing units for tropical and subtropical regions using LCA methodologies [4]. These reports include bill of quantities, plans, performance analysis, and lifespan of the studied shelters. The data from these reports was used to develop the Life Cycle Inventories (LCI). All the amounts were converted from their original units (length, volume and amount) into mass (kg) units and the transport distance into ton×km. These LCIs represent the production phases of each shelter and the transportation distances for the construction materials. Two types of distances were included, local (road) and international (freight ship), which were estimated based on the area of the country of study. Furthermore, the digital visualization of the shelters is presented for each of the 20 designs. Moreover, this data article presents a summary of the results for the categories Environment, Cost and Risk and the contribution to the environmental impact from the different building components of each shelter. These results are related to the article "Global or local construction materials for post-disaster reconstruction? Sustainability assessment of 20 post-disaster shelter designs"[5].

  9. Design and Construction of a Robotic Vehicle with Omni-directional Mecanum Wheels

    Directory of Open Access Journals (Sweden)

    Ján VACHÁLEK

    2014-06-01

    Full Text Available The paper deals with the design and construction of a universal robotic vehicle prototype, used for laboratory and educational purposes. The main goal is its use as a technology demonstrator for the needs of students, therefore it is equipped with several kinds of sensors and universal advanced control technologies and design solutions. Its basis is a control system and construction concept using mobile battery gear and omnidirectional Mecanum wheels. A manipulating arm and advanced tracking and spatial navigation systems are also components of the design. Since the problem of a customized design and construction of such a robotic vehicle is very complex and solved in various scientific fields, in this paper we will mainly focus on the detailed description of the control systems and subsystems of the vehicle.

  10. The design and construction of a central radiopharmacy

    International Nuclear Information System (INIS)

    Elliott, A.T.; Hilditch, T.E.; Murray, T.; McNulty, H.

    1993-01-01

    Following an inspection by the Medicines Control Agency (MCA) of the existing radiopharmacy, it was necessary to design and build a new facility at the Western Infirmary to supply radiopharmaceuticals for patient use throughout the West of Scotland. This is one of the largest radiopharmacies in Europe, supplying some 40 000 patient doses per year prepared using both closed and open procedures. The design parameters and construction details of the new facility are presented. (Author)

  11. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  12. On the effectiveness in implementing a waste-management-plan method in construction

    International Nuclear Information System (INIS)

    Tam, Vivian W.Y.

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method

  13. Design and construction of a personal radiation monitor

    International Nuclear Information System (INIS)

    Oliveira, A.H. de.

    1979-01-01

    The design and construction of a personal radiation monitor is dealt with. It provides a direct and reliable reading of the received dose, and sounds an alarm in the event of an excessive dose rate. A detailed analysis of its design, construction and caracteristics is given, as well a comparison with usual dosimeters. The apparatus is based on large-scale integrated electronics, it is reliable, easy to read, and can be used in the same manner as a film-badge. Contrariwise to both the film-badge and the termoluminescent dosimeters, it allows a direct reading. Also, it is not susceptible to false readings due to mechanical shocks, which is the weak point of the pocket ionization chamber. The dosimeter described herein is equipped with a special corrective shield that gives the correct dose reading, regardless of the photon energy. It is also highly immune to neutron interference. (Author) [pt

  14. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  15. Study of the layout plan in the tokamak complex building for ITER

    International Nuclear Information System (INIS)

    Sato, Kazuyoshi; Yagenji, Akira; Sekiya, Shigeki; Takahashi, Hideo; Tamura, Kousaku; Neyatani, Yuzuru; Hashimoto, Masayoshi; Ogino, Shunji; Nagamatsu, Nobuhide; Motohashi, Keiichi; Uehara, Masaharu; Kataoka, Takahiro; Ohashi, Hironori

    2006-03-01

    This report summarizes study of the layout plan in the ITER Tokamak complex building as an invite to set up its plant in Japan. To draw up this arrangement plan, final design report (FDR), which was designed for main components and determined for the non-site specific design, was reconstructed systematically for the Japanese site. A supplementary design was performed for the insufficiency parts of FDR. An additional study was also performed for the adaptation of a regulatory framework including technical safety requirements in Japan. We proposed the tokamak complex building with seismic isolation to combine with the hot cell building. Through the studies, a layout plan has been constructed including maintenance plan for personnel access and component route with in the building from assembly to operation period. This layout plan would be used as a basis in the construction period, although final decision will be done by ITER organization. (author)

  16. Engineered surface barriers for waste disposal sites: lysimeter facility design and construction

    International Nuclear Information System (INIS)

    Phillips, S.J.; Ruben, M.S.; Kirkham, R.R.

    1988-01-01

    A facility to evaluate performance of engineered surface carriers for confinement of buried wastes has been designed, constructed, and operations initiated. The Field Lysimeter Test Facility is located at the US Department of Energy's Hanford Site in Richland, Washington. The facility consists of 18 one-dimensional drainage and weighing lysimeters used to evaluate 7 replicated barrier treatments. Distinct layers of natural earth materials were used to construct layered soil and rock barriers in each lysimeter. These barrier designs are capable in principal of significantly reducing or precluding infiltration of meteoric water through barriers into underlying contaminated zones. This paper summarizes salient facility design and construction features used in testing of the Hanford Site's engineered surface barriers

  17. 24 CFR 941.203 - Design and construction standards.

    Science.gov (United States)

    2010-04-01

    ... national building code, such as Uniform Building Code, Council of American Building Officials Code, or Building Officials Conference of America Code; (2) Applicable State and local laws, codes, ordinances, and... intended to serve. Building design and construction shall strive to encourage in residents a proprietary...

  18. Design, Construction, Demonstration and Delivery of an Automated Narrow Gap Welding System.

    Science.gov (United States)

    1982-06-29

    DESIGN, CONSTRUCTION, DEMONSTRATION AND DELIVERY OF WE DA4I &NARROW GAP CONTRACT NO. NOOGOO-81-C-E923 TO DAVID TAYLOR NAVAL RESEARCH AND DEVELOPMENT...the automated * Narrow Gap welding process, is the narrow (3/8 - inch), square-butt joint *design. This narrow joint greatly reduces the volume of weld...AD-i45 495 DESIGN CONSTRUCTION DEMONSTRATION AiND DELIVERY OF RN 1/j AUrOMATED NARROW GAP WELDING SYSTEMI() CRC AUTOMATIC WELDING CO HOUSTON TX 29

  19. The planning and construction of Distributed Energy System in Qingdao Sino-German Eco-park

    Science.gov (United States)

    Wei, Cun; Zhang, Gaijing; Song, Peipei

    2018-04-01

    This paper introduce the development and characteristics of new energy, Eco-city and Distributed Energy System in China, a case study of Qingdao Sino-German Eco-park, research on practical application about planning and construction of Distributed Energy System in Eco-city. Results show that: we must first do a good job in energy planning, giving full play to their own advantages, and Distributed Energy System based renewable energy resources is a promising option for reducing emissions from electricity generation in Eco-city.

  20. Designing Targets for Elective Nodal Irradiation in Lung Cancer Radiotherapy: A Planning Study

    International Nuclear Information System (INIS)

    Kepka, Lucyna; Tatro, Daniel; Moran, Jean M.; Quint, Leslie E.; Hayman, James A.; Ten Haken, Randall K.; Kong Fengming

    2009-01-01

    Purpose: To assess doses received by mediastinal and hilar lymph node stations (LNS) delineated according to published recommendations when 'standard' two-dimensional (2D) elective fields are applied and to assess doses to critical structures when fields are designed using 2D and three-dimensional (3D) treatment planning for elective irradiation. Methods and Materials: LNS were delineated on axial CT scans according to existing recommendations. For each case and tumor location, 2D anteroposterior-posteroanterior (AP-PA) elective fields were applied using the AP-PA CT topograms. From the 2D portal fields, 3D dose distributions were then calculated to particular LNS. Next, 3D plans were prepared for elective nodal irradiation for tumors of different lobes. Doses for critical structures were compared for 2D and 3D plans. Results: LNS 1/2R, 1/2L, 3A, 3P, 5, 6, and 8 were not adequately covered in a substantial part of plans by standard 2D portals when guidelines for delineation were strictly followed. The magnitude of the lack of coverage increased with margin application. There was a trend for a higher yet probably still safe dose delivered to lung for 3D plans compared with 2D plans with a prescription dose of 45 Gy. Conclusions: 2D fields did not entirely cover LNS delineated according to the recommendations for 3D techniques. A strict adherence to these guidelines may lead to larger portals than traditionally constructed using 2D methods. Some modifications for clinical implementation are discussed.

  1. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  2. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  3. Design, construction, and calibration of a nonfocusing neutron spectrometer

    International Nuclear Information System (INIS)

    Storey, W.

    1974-12-01

    A fourteen-channel time-resolved neutron spectrometer with associated Faraday cup has been designed and constructed for use in the field. A neutron energy range of 9.5 to 15 MeV is covered. Both instruments detect protons elastically scattered from a thin hydrogenous foil in interaction with the neutron beam, with magnetic analysis of the protons by the spectrometer. The design requirements of small size and weight and 0.6 to 0.7 MeV resolution have been met. Following a description of the instrument and of its geometry, there is a detailed presentation of the design and construction of the instrument. The section on instrument performance is concerned with the comparison between predicted performance based upon computation, in which the magnet is of primary interest, and upon measured performance based upon a calibration experiment, which is given a general description in Appendix A. Software used mainly for signal prediction and unfolding, for both the neutron spectrometer and Faraday cup, is described

  4. 25 CFR 170.407 - What happens to unobligated planning funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to unobligated planning funds? 170.407... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation Planning § 170.407 What happens to unobligated planning funds? Once all tribal governments...

  5. Design and construction of low level radioactive waste disposal facility at Rokkasho storage center

    International Nuclear Information System (INIS)

    Takahashi, K.; Itoh, H.; Iimura, H.; Shimoda, H.

    1992-01-01

    Japan Nuclear Fuel Industries Co., Inc. (JNFI) which has been established to dispose through burial the low-level radioactive waste (LLW) produced by nuclear power stations over the country is now constructing Rokkasho LLW Storage Center at Rokkasho Village,Aomori Prefecture. At this storage center JNFI plans to bury about 200,000m 3 , of LLW (equivalent to about one million drums each with a 200 liter capacity), and ultimately plans to bury about 600,000m 3 about 3 million drums of LLW. About the construction of the burial facilities for the first-stage LLW equivalent to 200,000 drums (each with a 200-liter capacity) we obtained the government's permit in November, 1990 and set out the construction work from the same month, which has since been promoted favorably. The facilities are scheduled to start operation from December, 1992. This paper gives an overview of at these facilities

  6. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  7. Design and construction of the SAPHIR detector

    International Nuclear Information System (INIS)

    Schwille, W.J.; Bockhorst, M.; Burbach, G.; Burgwinkel, R.; Empt, J.; Guse, B.; Haas, K.M.; Hannappel, J.; Heinloth, K.; Hey, T.; Honscheid, K.; Jahnen, T.; Jakob, H.P.; Joepen, N.; Juengst, H.; Kirch, U.; Klein, F.J.; Kostrewa, D.; Lindemann, L.; Link, J.; Manns, J.; Menze, D.; Merkel, H.; Merkel, R.; Neuerburg, W.; Paul, E.; Ploetzke, R.; Schenk, U.; Schmidt, S.; Scholmann, J.; Schuetz, P.; Schultz-Coulon, H.C.; Schweitzer, M.; Tran, M.Q.; Vogl, W.; Wedemeyer, R.; Wehnes, F.; Wisskirchen, J.; Wolf, A.

    1994-01-01

    The design, construction, and performance of the large solid angle magnetic spectrometer SAPHIR is described. It was built for the investigation of photon-induced reactions on nucleous and light nuclei with mulit-particle final states up to photon energies of 3.1 GeV. The detector is equipped with a tagged photon beam facility and is operated at the stretcher ring ELSA in Bonn. (orig.)

  8. Design and construction of the SAPHIR detector

    Energy Technology Data Exchange (ETDEWEB)

    Schwille, W.J. (Bonn Univ. (Germany). Physikalisches Inst.); Bockhorst, M. (Bonn Univ. (Germany). Physikalisches Inst.); Burbach, G. (Bonn Univ. (Germany). Physikalisches Inst.); Burgwinkel, R. (Bonn Univ. (Germany). Physikalisches Inst.); Empt, J. (Bonn Univ. (Germany). Physikalisches Inst.); Guse, B. (Bonn Univ. (Germany). Physikalisches Inst.); Haas, K.M. (Bonn Univ. (Germany). Physikalisches Inst.); Hannappel, J. (Bonn Univ. (Germany). Physikalisches Inst.); Heinloth, K. (Bonn Univ. (Germany). Physikalisches Inst.); Hey, T. (Bonn Univ. (Germany). Physikalisches Inst.); Honscheid, K. (Bonn Univ. (Germany). Physikalisches Inst.); Jahnen, T. (Bonn Univ. (Germany). Physikalisches Inst.); Jakob, H.P. (Bonn Univ. (Germany). Physikalisches Inst.); Joepen, N. (Bonn Univ. (Germany). Physikalisches Inst.); Juengst, H. (Bonn Univ. (Germany). Physikalisches Inst.); Kirch, U. (Bonn Univ. (Germany). Physikalisches Inst.); Klein, F.J. (Bonn Univ. (Germany). Physikalisches Inst.)

    1994-05-15

    The design, construction, and performance of the large solid angle magnetic spectrometer SAPHIR is described. It was built for the investigation of photon-induced reactions on nucleous and light nuclei with mulit-particle final states up to photon energies of 3.1 GeV. The detector is equipped with a tagged photon beam facility and is operated at the stretcher ring ELSA in Bonn. (orig.)

  9. Design and construction of a NIR spectrometer

    CERN Document Server

    Barcala-Riveira, J M; Fernandez-Marron, J L; Molero-Menendez, F; Navarrete-Marin, J J; Oller-Gonzalez, J C

    2003-01-01

    This document describes the design and construction of a NIR spectrometer based on an acoustic-optic tunable filter. The spectrometer will be used for automatic identification of plastics in domestic waste. The system works between 1200 and 1800 nm. Instrument is controlled by a personal computer. Computer receives and analyses data. A software package has been developed to do these tasks. (Author) 27 refs.

  10. Design and construction of a NIR spectrometer

    International Nuclear Information System (INIS)

    Barcala Riveira, J. M.; Fernandez Marron, J. L.; Alberdi Primicia, J.; Molero Menendez, F.; Navarrete Marin, J. J.; Oller Gonzalez, J. C.

    2003-01-01

    This document describes the design and construction of a NIR spectrometer based on an acoustic-optic tunable filter. The spectrometer will be used for automatic identification of plastics in domestic waste. The system works between 1200 and 1800 nm. Instrument is controlled by a personal computer. Computer receives and analyses data. A software package has been developed to do these tasks. (Author) 27 refs

  11. Planning and design of the Ikedako bride (temporary name); Ikedakokyo (kasho) no keikaku to sekkei

    Energy Technology Data Exchange (ETDEWEB)

    Mochizuki, H.; Iizuka, Y.; Yukawa, Y. [Japan Highway Public Corporation, Tokyo (Japan)

    1997-09-30

    This paper describes the planning and design of the Ikeda-Lake Bridge of the Tokushima Express Way. This bridge is a PC (prestressed concrete) five-span continuous balanced arch bridge with a length 705 m. This bridge transverses prefectural road, Ikeda Dam Lake of Yoshino River, park, JR line, national highway, and town road, and both ends of the bridge are tunnels, resulting in the complicated bridging condition. Various bridging methods were examined from the viewpoint of structural characteristics, workability, profitability, maintenance/management, and aspect. A bridge with PC stiffening girders was adopted. The maximum interval between supports is 200 m. This bridge has the largest scale as a concrete arch bridge in Japan. Basements of bridge piers were constructed by pneumatic caisson method and large-diameter deep basement method. Since basements were located in the dam lake and they were quickly constructed in a short period in a non-flood season, steel caissons were separately fabricated in the dock, towed and placed for excavation. For the construction of upper section, overhang method was adopted using movable working vehicle. For the construction of arch section, the arch was overhung simultaneously in the both sides by composing the truss using stiffened girders, arch ribs, vertical members, and temporary cable stayed members, which was the first in Japan. In 1997, basement construction was completed, and construction of bridge piers and a part of the construction of upper section have been started. 2 refs., 12 figs.

  12. 30 CFR 74.7 - Design and construction requirements.

    Science.gov (United States)

    2010-07-01

    ... shall measure respirable coal mine dust concentrations accurately, as specified under § 74.8, for an end... 15.1 through 15.407 (FCC Radio Frequency Devices). Persons must proceed in accordance with IEEE Std... CPDM shall be designed and constructed to remain safe and measure respirable coal mine dust...

  13. Design-a-wetland: a tool for generating and assessing constructed wetland designs for wastewater treatment

    International Nuclear Information System (INIS)

    Casaril, Carolina J.

    2007-01-01

    Full text: Full text: The hydrological cycle is a key cycle affected by current and predicted climate change. Wetlands are one of the key ecosystems within the hydrological cycle and could contribute significantly in facing the challenges of climate change, such as water shortage. The impact of wetlands on greenhouse gas emissions is much debated and, conversely, the impact of climate change on wetlands also raises many questions. There have been many attempts to harness and integrate the natural capacities of wetlands into constructed systems. These systems are especially designed for multiple purposes. They can be used for wastewater treatment and reuse, and have the potential to increase sustainability by changing land and water use practices. This project generates a 'Design-A-Wetland' prototype model, designed to facilitate decision-making in the creation of constructed wetlands. Constructed wetlands are specifically tailored to their end use; water treatment fish and fowl habitat, flood buffer zones, or sequestration of greenhouse gases. This project attempts to answer the following questions: Can a single integrated decision model be created for the design and assessment of artificial wetlands, provided either entry or exit standards are known and specified?; Can the elements of a system of interfacing the model with public consultation be specified?; The project identifies model schematics and lays the groundwork for modelling suited to the wide variety of inputs required for decision making

  14. Impact of ACI-ASME code on design and construction of nuclear containment structures

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1978-01-01

    The effect of the ACI-ASME code for design and construction of concrete containment structures on the nuclear and concrete industries is examined. Topics covered include purpose of the code, general requirements, responsibilities and duties, design and construction specifications, quality assurance, inspection, the liner, and stamping

  15. Trench design and construction techniques for low-level radioactive waste disposal

    International Nuclear Information System (INIS)

    Tucker, P.G.

    1983-02-01

    This document provides information on trench design and construction techniques which can be used in the disposal of LLW by shallow land burial. It covers practices currently in use not only in the LLW disposal field, but also methods and materials being used in areas of hazardous and municipal waste disposal which are compatible with the performance objectives of 10 CFR Part 61. The complexity of a disposal site and its potential problems dictate the use of site-specific characteristics when designing a LLW disposal trench. This report presents the LLW disposal trench as consisting of various elements or unit processes. The term unit processes is used as it more fully relays the impact of the designer's choice of methods and materials. When choosing a material to fulfill the function of a certain trench element, the designer is also stipulating a portion of his operational procedure which must be compatible with the disposal operation as a whole. Information is provided on the properties, selection, and installation of various materials such as bentonite, soil-cement, polymeric materials, asphaltic materials, and geotechnical fabrics. This is not intended to outline step-by-step procedures. Basically, three time frames are addressed with respect to construction techniques; preoperational, operational, and postoperational. Within each of these time frames there are certain construction techniques which can be employed by the designer to enhance the overall ease of construction and ultimate success of the disposal facility. Among the techniques presented are precontouring the disposal area, alignment of the trench axis, sloping the trench bottom, incremental excavation, and surface water (runoff) management

  16. Plasma focus system: Design, construction and experiments

    International Nuclear Information System (INIS)

    Alacakir, A.; Akguen, Y.; Boeluekdemir, A. S.

    2007-01-01

    The aim of this work is to construct a compact experimental system for fusion research. The design, construction and experiments of the 3 kJ Mather type plasma focus machine is described. This machine is established for neutron yield and fast neutron radiography by D-D reaction which is given by D + D→ 3 He (0.82 MeV) + n (2.45 MeV) . Investigation of the geometry of plasma focus machine in the presence of high voltage drive and vacuum system setup is shown. 108 neutron per pulse and 200 kA peak current is obtained for many shots. Scintillator screen for fast neutron imaging, sensitive to 2.45 MeV neutrons, is also manufactured in our labs. Structural neutron shielding computations for safety is also completed

  17. Design and Construction of Variable Direct Current Speed Drive ...

    African Journals Online (AJOL)

    controlled rectifiers from the viewpoint of simplicity and cost effectiveness to act as power converter and controller. Design and construction of constituent circuits such as acceleration/deceleration, speed and current amplifier and the trigger ...

  18. Development of a Supporting System of the Business Continuity Plan (BCP) for Construction Companies

    Science.gov (United States)

    Mano, Kouhei; Shiraki, Wataru; Inomo, Hitoshi; Kuyama, Hironori; Isouchi, Chikako

    Recently, the natural disaster and the accident have happened frequently. Thus, many companies and local organizations had been suffered such as discontinuity of business, loss of profits, customers' confidence decrease, and tremendous damage out of business. Especially the business stop of construction companies are influenced the recovery activities, so that it could be late the rescue activities. In this study, a supporting system of the business continuity plan (BCP) for construction companies is developed using the web server and database, and then some ideas for the user's friendly system are considered.

  19. A Study on the construction of 22.9 kV distribution test line of KEPCO

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Hi Kyun; Choi, Hung Sik; Hwang, Si Dole; Jung, Young Ho [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Kim, Dong Hwan; Choi, Chang Huk [Korea Power Engineering Company and Architecture Engineers (Korea, Republic of)

    1995-12-31

    In order to enhance the reliability of power supply and the quality of electricity, a study on the construction of 22.9 kV distribution test line was performed. The main objective of this study was to establish a construction plan and a basic design to perform the construction and the detailed design of the test line effectively. (author). 21 refs., 45 figs.

  20. Software for CATV Design and Frequency Plan Optimization

    OpenAIRE

    Hala, O.

    2007-01-01

    The paper deals with the structure of a software medium used for design and sub-optimization of frequency plan in CATV networks, their description and design method. The software performance is described and a simple design example of energy balance of a simplified CATV network is given. The software was created in programming environment called Delphi and local optimization was made in Matlab.

  1. The evaluation, design and construction of the uranium plant for Chemwes Limited

    International Nuclear Information System (INIS)

    Viljoen, E.B.; Bluhm, B.J.; Pilkington, W.; Taylor, J.L.; Robinson, J.E.; Le Grange, P.

    1981-01-01

    The Chemwes uranium plant was designed and constructed within fifteen months; commissioning started during June 1979, and the plant was producing at design capacity four months later. This account highlights the procedures and methods adopted to bring the plant into production. The description of the various phases includes some details of the early evaluation, and the feasibility and optimization studies; of the financing, project management, design, construction, and commissioning of the plant; and of the training of personnel. Some of the mistakes made and the factors that contributed to the success are also listed [af

  2. BIM approach for automated drafting and design for modular construction manufacturing

    NARCIS (Netherlands)

    Alwisy, A.; Al-Hussein, M.; Al-Jibouri, Saad H.S.; Issa, R.R.; Flood, I.

    2012-01-01

    Industrialization creates new requirements for design. Designers need to consider not only building performance, but also production plan needs. This requires a well-structured Building Information Model (BIM) to support the manufacturing needs for design and drafting. BIM, in combination with CAD

  3. Comparative Study On The Ethical Perceptions Of Contractors And Designers In The China Construction Industry

    Science.gov (United States)

    Kang, Byung Gyoo; Long, Kaiwen; Zhang, Cheng; Li Hao, Jian

    2017-12-01

    Ethics is becoming one of the most important requirements for successful business in the 21st century. The construction industry cannot be exceptional from this trend. However construction ethics management requires different approaches from other industries, as the products of the industry are construction projects which are completely different from mass production. Contractors and designers are two major participants in construction projects. The roles and responsibilities of these two project stakeholders decisively influence all aspects of construction project. Practically ethical perceptions of contractors and designers are one of main aspects to be considered for the effective and efficient management of ethics for the construction industry. This research has investigated the ethical perceptions of contractors and designers in the China construction industry. A questionnaire survey which contains 15 ethical issues and 6 demographic factors has been conducted. 170 construction professionals from construction companies and consulting companies have been participated in this survey. These 15 ethical issues are ranked in terms of seriousness, frequency and importance for both contractors and designers as a single group to understand the overall perceptions in the industry. The analysis has also been conducted for contractors and designers respectively to make comparisons between them. The top three serious ethical issues in the industry are ‘Bribery and corruption’, ‘Failure to practice whistle-blowing’ and ‘Improper bidding practices’. Contractors and designers showed similar outcomes for the top five important ethical issues. But for the middle ranged ethical issues, they showed some differences. Further researches are required to identify the causes of the similarity and differences.

  4. Design and construction of a deep slurry trench barrier

    International Nuclear Information System (INIS)

    Deming, P.W.

    1997-01-01

    A 24 m (80 ft) deep slurry trench surrounding a former chromium manufacturing facility on the Patapsco River in Baltimore, Maryland was constructed in 1995 to contain groundwater and site Soils, and to reduce the volume of groundwater extracted to maintain an inward gradient. In 1992, an embankment made of crushed stone was constructed in the Patapsco River to make land for barrier construction outboard of the bulkheads, and to protect the barrier. Stability of the slurry-supported trench excavation in the embankment required construction from an elevated work platform. An extended reach backhoe was used to excavate the deep slurry trench and to clean the trench bottom. Soil-Bentonite backfill was prepared at a central mixing area and transported by truck to the perimeter barrier. A synthetic membrane was inserted partially into the backfill for connection to a multimedia cap, and for redundancy and erosion control in the tidal zone. Hydraulic testing of the aquitard contained by the barrier demonstrated excellent performance of the barrier and bottom closure. Detailed definition of subsurface conditions and the closure stratum was necessary for the design and successful construction of the barrier, and is recommended for comparable slurry trench construction projects

  5. General construction requirements for the deep repository in the KBS-3 system

    International Nuclear Information System (INIS)

    2002-10-01

    The KBS-3 systems includes equipment and plants for transport of spent nuclear fuels and encapsulated spent fuels, central intermediate storage, encapsulation and deep geologic disposal. The requirements in this document concern the repository and have been put together in view of the tasks of designing, constructing and building the repository. The report presents: A general review of existing design plans; Laws and regulations relevant for the design of the repository; How the regulations have been broken down to functional demands and dimensioning requirements for the repository; How the site conditions influence the design, and how the layout of the different parts of the repository interact; Relations between the functions of the repository, the safety and the design; A foundation for developing construction plans for the repository. The requirements will be collected in a database that will develop as new knowledge is collected

  6. Architecture between construction and expression

    Directory of Open Access Journals (Sweden)

    Luca Lanini

    2015-11-01

    Full Text Available I think that the problem is basically the same as always: to redefine the relationship between Construction and Expression. On one hand, construction is considered an endeavor, on the other hand, a tendency to contest architecture only with expression. The relationship between architecture and control of urban phenomena is a relationship that has been gradually lost in the past three decades and has been replaced by the relationship between finance and planning. A useful object is very different from a building: for its time and costs of construction. Buildings are expected to last many years and are paid with everybody’s taxes, a design object’s lifespan is perhaps fifty years, then it’s ready to be modernized or for the landfill ... I believe that the main tool that a designer must have, beyond necessary technical skills, is the capacity of his/her own critical thought.

  7. Implementation of sustainability in bridge design, construction and maintenance.

    Science.gov (United States)

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  8. Rationalization of design and construction of buildings for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-02-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.).

  9. Rationalization of design and construction of buildings for nuclear power plants

    International Nuclear Information System (INIS)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-01-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.)

  10. Design and construction of the KSTAR tokamak

    International Nuclear Information System (INIS)

    Lee, G.S.

    2001-01-01

    The extensive design effort has been focused on two major aspects of the KSTAR project mission, steady-state operation capability and 'advanced tokamak' physics. The steady-state aspect of mission is reflected in the choice of superconducting magnets, provision of actively cooled in-vessel components, and long-pulse current-drive and heating systems. The 'advanced tokamak' aspect of the mission is incorporated in the design features associated with flexible plasma shaping, double-null divertor and passive stabilizers, internal control coils , and a comprehensive set of diagnostics. Substantial progress in engineering has been made on superconducting magnets, vacuum vessel, plasma facing components, and power supplies. The new KSTAR experimental facility with cryogenic system and de-ionized water-cooling and main power systems has been designed, and the construction work has been on-going for completion in year 2004. (author)

  11. 46 CFR 160.061-3 - Design and construction.

    Science.gov (United States)

    2010-10-01

    ... Design and construction. (a) Container. The container shall be made of ethyl cellulose, clear, type EM—1... prepared in pamphlet form, approximately 21/2 inches by 41/2 inches on parchment paper, in waterproof ink, with printing on one side of the paper only. The booklet shall contain a complete description of how...

  12. Global or local construction materials for post-disaster reconstruction? Sustainability assessment of 20 post-disaster shelter designs

    Directory of Open Access Journals (Sweden)

    E. Zea Escamilla

    2015-09-01

    Full Text Available This data article presents the life cycle inventories of 20 transitional shelter solutions. The data was gathered from the reports 8 shelter designs [1]; 10 post-disaster shelter designs [2]; the environmental impact of brick production outside of Europe [3]; and the optimization of bamboo-based post-disaster housing units for tropical and subtropical regions using LCA methodologies [4]. These reports include bill of quantities, plans, performance analysis, and lifespan of the studied shelters. The data from these reports was used to develop the Life Cycle Inventories (LCI. All the amounts were converted from their original units (length, volume and amount into mass (kg units and the transport distance into ton×km. These LCIs represent the production phases of each shelter and the transportation distances for the construction materials. Two types of distances were included, local (road and international (freight ship, which were estimated based on the area of the country of study. Furthermore, the digital visualization of the shelters is presented for each of the 20 designs. Moreover, this data article presents a summary of the results for the categories Environment, Cost and Risk and the contribution to the environmental impact from the different building components of each shelter. These results are related to the article “Global or local construction materials for post-disaster reconstruction? Sustainability assessment of 20 post-disaster shelter designs”[5

  13. Quality of Slab Track Construction - Track Alignment Design and Track Geometry

    Science.gov (United States)

    Šestáková, Janka

    2015-05-01

    The slab track superstructure design (without ballast) is a perspective construction especially for building tunnels and bridges in the modernized sections of railway tracks in Slovakia. Monitoring of the structure described in this article is focused on the transition areas between standard structure with ballast and slab track construction.

  14. The design and construction of the ZEUS central tracking detector

    Energy Technology Data Exchange (ETDEWEB)

    Foster, B.; Malos, J.; Saxon, D.H.; Clark, D.E.; Jamdagni, A.K.; Markou, C.; Miller, D.B.; Miller, D.G.; Toudup, L.W.; Auty, C.G.; Blair, G.A.; Brooks, C.B.; Cashmore, R.J.; Hanford, A.T.; Harnew, N.; Holmes, A.R.; Linford, W.; Martin, N.C.; McArthur, I.C.; Nash, J.; Nobbs, K.N.; Wastie, R.L.; Williams, M.T.; Wilson, F.F.; Wilson, R.D.; Hart, J.C.; Hatley, R.W.; Hiddleston, J.W.; Gibson, M.D.; McCubbin, N.A.; Middleton, A.; Morrissey, M.C.; Morrow, D.; O' Brien, P.; Payne, B.T.; Roberts, J.C.H.; Shaw, T.B.; Sinclair, C.K.; Wallis, E.W.G.; White, D.J.; Yeo, K.L.; Bullock, F.W.; Dumper, J.; Fraser, T.J.; Hayes, D.; Jones, T.W.; Strachan, D.E.; Vine, I.A. (H.H. Wills Physics Lab., Univ. of Bristol (United Kingdom) Dept. of Physics and Astronomy, Univ. of Glasgow (United Kingdom) Blackett Lab., Physics Dept., Imperial Coll., London (United Kingdom) Dept. of Physics, Nuclear Physics Lab., Univ. of Oxford (United Kingdom) Rutherford Appleton Lab., Chilton (United Kingdom) Dept. of Physics an

    1994-01-15

    The mechanical, electrical and electronic design and construction of the ZEUS central tracking detector are described, together with the chamber monitoring and environmental control. This cylindrical drift chamber is designed for track reconstruction, electron identification and fast event triggering in a high beam-crossing rate, high magnetic field application. (orig.)

  15. Baby MIND Experiment Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Antonova, M.; et al.

    2017-04-28

    Baby MIND is a magnetized iron neutrino detector, with novel design features, and is planned to serve as a downstream magnetized muon spectrometer for the WAGASCI experiment on the T2K neutrino beam line in Japan. One of the main goals of this experiment is to reduce systematic uncertainties relevant to CP-violation searches, by measuring the neutrino contamination in the anti-neutrino beam mode of T2K. Baby MIND is currently being constructed at CERN, and is planned to be operational in Japan in October 2017.

  16. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  17. Optimization of design and erection methods to minimize the construction time-schedule of EPR plants

    International Nuclear Information System (INIS)

    Pierrat, Michel; L'Huby, Yvan; Decelle, Alain

    1999-01-01

    This paper presents the results of the investigations made during the Basic Design of the EPR project (European Pressurized water Reactor) to shorten the construction schedule. A 57 months construction schedule can be reached for the first unit. The investigations concern both design and construction methods. (author)

  18. Software for CATV Design and Frequency Plan Optimization

    Directory of Open Access Journals (Sweden)

    O. Hala

    2007-09-01

    Full Text Available The paper deals with the structure of a software medium used for design and sub-optimization of frequency plan in CATV networks, their description and design method. The software performance is described and a simple design example of energy balance of a simplified CATV network is given. The software was created in programming environment called Delphi and local optimization was made in Matlab.

  19. The use of modern measurement techniques for designing pro ecological constructions

    Science.gov (United States)

    Wieczorowski, Michał; Gapiński, Bartosz; Szymański, Maciej; Rękas, Artur

    2017-10-01

    In the paper some possibilities of application modern length and angle metrology techniques to design constructions that support ecology were presented. The paper is based on a project where a lighter bus and train car seat was developed. Different options were presented including static and dynamic photogrammetry, computed tomography and thermography. Research related with dynamic behaviour of designed structures gave input to determine deformation of a seat and passengers sitting on it during communication accidents. Works connected to strength of construction elements made it possible to optimize its dimensions maintaining proper durability. Metrological actions taken in relation to production machines and equipment enabled to better recognize phenomena that take place during manufacturing process and to correct its parameters, what in turns also contributed to slim down the construction.

  20. Design and Construction Solutions in the Accurate Realization of NCSX Magnetic Fields

    International Nuclear Information System (INIS)

    Heitzenroeder, P.; Dudek, Lawrence E.; Brooks, Arthur W.; Viola, Michael E.; Brown, Thomas; Neilson, George H.; Zarnstorff, Michael C.; Rej, Donald; Cole, Michael J.; Freudenberg, Kevin D.; Harris, J.H.; McGinnis, Gary

    2008-01-01

    The National Compact Stellarator Experiment, NCSX, is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge national Laboratory. The goal of NCSX is to provide the understanding necessary to develop an attractive, disruption free, steady state compact stellarator based reactor design. This paper describes the recently revised designs of the critical interfaces between the modular coils, the construction solutions developed to meet assembly tolerances, and the recently revised trim coil system that provides the required compensation to correct for the 'as built' conditions and to allow flexibility in the disposition of as-built conditions. In May, 2008, the sponsor decided to terminate the NCSX project due to growth in the project's cost and schedule estimates. However significant technical challenges in design and construction were overcome, greatly reducing the risk in the remaining work to complete the project

  1. 25 CFR 170.400 - What is the purpose of transportation planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of transportation planning? 170.400... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation Planning § 170.400 What is the purpose of transportation planning? The purpose of transportation...

  2. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  3. Construction, Maintenance and Repair as Elements in Rubble Mound Breakwater Design

    DEFF Research Database (Denmark)

    Burcharth, Hans F.; Rietveld, C.F.W.

    Very often rubble mound breakwater designs seem to be a result only of stability considerations corresponding to design wave conditions. Designers tend to put too little emphasis on practical problems related to construction, maintenance and repair. As is discussed in the paper due consideration...... of these problems Ieeds to a more economical design in terms of lower total costs during the structural lifetime....

  4. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  5. REQUIREMENTS FOR HAZARDOUS WASTE LANDFILL DESIGN, CONSTRUCTION AND CLOSURE

    Science.gov (United States)

    This publication contains edited versions of the material presented at ten Technology Transfer seminars conducted in 1988 on this subject. Sections are included on design of clay and flexible membrane liners, leachate collector systems, and landfill covers. Construction quality a...

  6. 25 CFR 170.404 - What happens when a tribe uses its IRR Program construction funds for transportation planning?

    Science.gov (United States)

    2010-04-01

    ... of Indian Reservation Roads Program Facilities Transportation Planning § 170.404 What happens when a... 25 Indians 1 2010-04-01 2010-04-01 false What happens when a tribe uses its IRR Program construction funds for transportation planning? 170.404 Section 170.404 Indians BUREAU OF INDIAN AFFAIRS...

  7. Under Construction: An Experiential Exercise Illustrating Elements of Work Design

    Science.gov (United States)

    Donovan, Kimberly M.; Fluegge-Woolf, Erin R.

    2015-01-01

    The Under Construction Exercise was developed by the authors to highlight key factors of work design that when implemented among the work group or entire organization can lead to an environment conducive to fostering satisfaction and motivation. In the exercise, groups are assigned to one of four different conditions that are designed to emulate…

  8. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  9. Comparison of design margin for core shroud in between design and construction code and fitness-for-service code

    International Nuclear Information System (INIS)

    Dozaki, Koji

    2007-01-01

    Structural design methods for core shroud of BWR are specified in JSME Design and Construction Code, like ASME Boiler and Pressure Vessel Code Sec. III, as a part of core support structure. Design margins are defined according to combination of the structural design method selected and service limit considered. Basically, those margins in JSME Code were determined after ASME Sec. III. Designers can select so-called twice-slope method for core shroud design among those design methods. On the other hand, flaw evaluation rules have been established for core shroud in JSME Fitness-for-Service Code. Twice-slope method is also adopted for fracture evaluation in that code even when the core shroud contains a flaw. Design margin was determined as structural factors separately from Design and Construction Code. As a natural consequence, there is a difference in those design margins between the two codes. In this paper, it is shown that the design margin in Fitness-for-Service Code is conservative by experimental evidences. Comparison of design margins between the two codes is discussed. (author)

  10. Construction design of apple sorter

    Directory of Open Access Journals (Sweden)

    Nieoczym Aleksander

    2018-01-01

    Full Text Available When assessing the quality of fruit and packaging process, fruit-producing farms owners decide to evaluate fruit by people or automated sorting lines. The purchase of an automated sorting line generates high costs for the company, but it brings benefits in the form of increased work efficiency, and the better organization of fruit packaging and storage processes. The use of that machinery and equipment is common in agricultural farms as well as in fruit and vegetable processing companies. Despite the widespread use of various types of fruit sorters, the analysis of the operation of the designed device and the study of its technological parameters is still a current research problem. During operation of the devices for sorting fruit there are many technical problems affecting technological processes and quality of fruits. In order to improve the efficiency of sorting fruit, this process should be quickly and accurately. The purpose of this paper is to present the automated apple sorter line construction design, and software for quality controlling fruits. Selected elements of the sorter structure including endurance calculation using the Finite Element Method (FEM and fruit control system using image analysis were presented.

  11. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  12. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is BIA's role in transportation planning? 170.401... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation Planning § 170.401 What is BIA's role in transportation planning? Except as provided in § 170.402...

  13. Design and construction of the Portable Industrial X-Ray Equipment

    International Nuclear Information System (INIS)

    Nguyen Phuc; Nguyen Van Si; Le Tien Quan; Trinh Anh Tuan; Nguyen Manh Hung; Trinh Dinh Tuong

    2011-01-01

    The main purposes of the project are the supporting to design and construction of the Portable Industrial X-Ray Equipment; with the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA. The Equipment is composed of control unit, X-ray generator, and power cable, connection cable. X-ray generator is assembling construction X-ray tube, H.V transformer together with gas insulation (SF6) are sealed up in aluminum bucked cabinet, fan and heat-sink are mounted in the end of X-ray generator as cooling, SF6 is a gas electrical performance to H.V. Alarm lamp is used to warn, flashing, show generating X-ray. Control unit is box construction. Four printed circuit boards (PCB) and electronic device are mounted in it. All operating buttons switches and displays are equipped on the panel. We have completed to design and construct the Portable Industrial X-Ray Equipment; and have tested the electronic parameters of all test points and the main parameters of equipment (the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA). We also have successful used the Portable Industrial X-Ray Equipment to evaluate the welds in industry. (author)

  14. Learning Earthquake Design and Construction 20. How do Beam ...

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 10; Issue 6. Learning Earthquake Design and Construction – How do Beam–Column Joints in RC Buildings Resist Earthquakes? C V R Murty. Classroom Volume 10 Issue 6 June 2005 pp 82-85 ...

  15. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  16. Sound insulation design of modular construction housing

    OpenAIRE

    Yates, D. J.; Hughes, Lawrence; Campbell, A.

    2007-01-01

    This paper provides an insight into the acoustic issues of modular housing using the Verbus System of construction. The paper briefly summarises the history of the development of Verbus modular housing and the acoustic design considerations of the process. Results are presented from two sound insulation tests conducted during the course of the project. The results are discussed in terms of compliance with Approved Document E1 and increased performance standards such as EcoHomes2.

  17. Design, Construction and Testing of a Dry Sand Sieving Machine ...

    African Journals Online (AJOL)

    This paper reports on the design, construction and Testing of a dry sand sieving machine. The sample to be sieved is uniformly graded. The coefficient of uniformity is 1.11, thus the machine design does not sieve larger particles such as gravel. The slip calculated is 36% which enabled the proper configuration of the V-belt.

  18. Designable DNA-binding domains enable construction of logic circuits in mammalian cells.

    Science.gov (United States)

    Gaber, Rok; Lebar, Tina; Majerle, Andreja; Šter, Branko; Dobnikar, Andrej; Benčina, Mojca; Jerala, Roman

    2014-03-01

    Electronic computer circuits consisting of a large number of connected logic gates of the same type, such as NOR, can be easily fabricated and can implement any logic function. In contrast, designed genetic circuits must employ orthogonal information mediators owing to free diffusion within the cell. Combinatorial diversity and orthogonality can be provided by designable DNA- binding domains. Here, we employed the transcription activator-like repressors to optimize the construction of orthogonal functionally complete NOR gates to construct logic circuits. We used transient transfection to implement all 16 two-input logic functions from combinations of the same type of NOR gates within mammalian cells. Additionally, we present a genetic logic circuit where one input is used to select between an AND and OR function to process the data input using the same circuit. This demonstrates the potential of designable modular transcription factors for the construction of complex biological information-processing devices.

  19. Design and construction the identification of nitriding plasma process parameters using personal computer based on serial communication

    International Nuclear Information System (INIS)

    Frida Iswinning Diah; Slamet Santosa

    2012-01-01

    Design and construction the identification of process parameters using personal computer based on serial communication PLC M-series has been done. The function of this device is to identify the process parameters of a system (plan), to which then be analyzed and conducted a follow-up given to the plan by the user. The main component of this device is the M-Series T100MD1616 PLC and personal computer (PC). In this device the data plan parameters obtained from the corresponding sensor outputs in the form of voltage or current. While the analog parameter data is adjusted to the ADC analog input of the PLC using a signal conditioning system. Then, as the parameter is processed by the PLC then sent to a PC via RS232 to be displayed in the form of graphs or tables and stored in the database. Software to program the database is created using Visual Basic Programming V-6. The device operation test is performed for the measurement of temperature parameter and vacuum level on the plasma nitriding machine. The results indicate that the device has functioning as an identification device parameters process of plasma nitriding machine. (author)

  20. Design, simulation and construction of the Taban tokamak

    Science.gov (United States)

    H, R. MIRZAEI; R, AMROLLAHI

    2018-04-01

    This paper describes the design and construction of the Taban tokamak, which is located in Amirkabir University of Technology, Tehran, Iran. The Taban tokamak was designed for plasma investigation. The design, simulation and construction of essential parts of the Taban tokamak such as the toroidal field (TF) system, ohmic heating (OH) system and equilibrium field system and their power supplies are presented. For the Taban tokamak, the toroidal magnetic coil was designed to produce a maximum field of 0.7 T at R = 0.45 m. The power supply of the TF was a 130 kJ, 0–10 kV capacitor bank. Ripples of toroidal magnetic field at the plasma edge and plasma center are 0.2% and 0.014%, respectively. For the OH system with 3 kA current, the stray field in the plasma region is less than 40 G over 80% of the plasma volume. The power supply of the OH system consists of two stages, as follows. The fast bank stage is a 120 μF, 0–5 kV capacitor that produces 2.5 kA in 400 μs and the slow bank stage is 93 mF, 600 V that can produce a maximum of 3 kA. The equilibrium system can produce uniform magnetic field at plasma volume. This system’s power supply, like the OH system, consists of two stages, so that the fast bank stage is 500 μF, 800 V and the slow bank stage is 110 mF, 200 V.

  1. Current situation and countermeasures of port logistics park information construction

    Directory of Open Access Journals (Sweden)

    Zhen Liu

    2013-03-01

    Full Text Available Purpose: Improve work efficiency of logistics park department, and drive the economy of the park and its surrounding areas. Design/methodology/approach: Analyze the information development situation and existent questions of current national logistics park, and design proper scheme to meet the demand of port logistics park. Findings: Proposed an information construction implementation plan using technology of the Internet of things which can be applied to port logistics park. Designed a scheme for the park information construction and explained the system's implementation strategy and implementation steps. Practical implications: The proposed construction program is particularly suitable for the northwest port logistics parks in China, and also has reference function to other logistics park construction. Originality/value: Group the information construction of the logistics park into four levels, three types of users, and two requirements. The scheme is innovative and comprehensive, which can ensure the development of port logistics park.

  2. Economic-mathematical model of planning construction-installation work for automation in drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tsay, L K

    1979-01-01

    The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.

  3. Proposed Model for Integrating RAMS Method in the Design Process in Construction

    Directory of Open Access Journals (Sweden)

    Saad Al-Jibouri

    2010-05-01

    Full Text Available There is a growing trend in the Netherlands for outsourcing public construction activities to the private sector through the use of integrated contracts. There is also an increasing emphasis from public clients on the use of RAMS and life cycle costing (LCC in the design process of infrastructural projects to improve the performance of designed systems and optimize the project cost. RAMS is an acronym for `reliability, availability, maintainability and safety' and represents a collection of techniques to provide predictions of the performance targets of the required system. Increasingly, RAMS targets are being specified in invitation to tender or contract documents and the parties responsible for the design are required to provide evidence of its application in their design. Recent evidence from practice, complemented with a literature study, has shown that the knowledge and application of RAMS in infrastructural designs are in their infancy compared with other industrial sectors and many designers in construction do not have the necessary knowledge and experience to apply it. This paper describes a proposed model for the integration of RAMS and LCC into the design process in construction. A variation of the model for the application of RAMS in `design, build, finance and maintain' (DBFM contracts that include maintenance requirements is also proposed. The two models involve providing guidelines to simplify the application of RAMs by the designers. The model has been validated for its practicality and usefulness during a workshop by experienced designers. DOI: 10.3763/aedm.2008.0100 Published in the Journal AEDM - Volume 5, Number 4, 2009 , pp. 179-192(14

  4. Exploration on Planning Methods for Rural Communities in the Local Economic and Institutional Contexts

    Institute of Scientific and Technical Information of China (English)

    Ying; WANG; Xin; PAN; Zhilun; XIAO; Xiangwei; CHENG; Caige; LI

    2014-01-01

    This paper reviews the wave of rural community construction, compares the urban and rural areas on the aspects of land property right, financing channels, construction management procedures, and the user-builder difference, and examines the unique characteristics of rural communities. On the basis of that, it proposes some planning methods for the rural community planning and construction, such as encouraging public participation, conducting public facility-oriented planning, and providing house-design menu, and further puts forward some supporting measures and policies.

  5. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  6. Siting, design and construction of a deep geological repository for the disposal of high level and alpha bearing wastes

    International Nuclear Information System (INIS)

    1990-06-01

    The main objective of this document is to summarize the basic principles and approaches to siting, design and construction of a deep geological repository for disposal of high level and alpha bearing radioactive wastes, as commonly agreed upon by Member States. This report is addressed to decision makers and technical managers as well as to specialists planning for siting, design and construction of geological repositories for disposal of high level and alpha bearing wastes. This document is intended to provide Member States of the IAEA with a summary outline for the responsible implementing organizations to use for siting, designing and constructing confinement systems for high level and alpha bearing radioactive waste in accordance with the protection objectives set by national regulating authorities or derived from safety fundamentals and standards of the IAEA. The protection objectives will be achieved by the isolation of the radionuclides from the environment by a repository system, which consists of a series of man made and natural safety barriers. Engineered barriers are used to enhance natural geological containment in a variety of ways. They must complement the natural barriers to provide adequate safety and necessary redundancy to the barrier system to ensure that safety standards are met. Because of the long timescales involved and the important role of the natural barrier formed by the host rock, the site selection process is a key activity in the repository design and development programme. The choice of the site, the investigation of its geological setting, the exploration of the regional hydrogeological setting and the primary underground excavations are all considered to be part of the siting process. 16 refs

  7. Design and planning of the Henderson Mine ventilation upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Loring, D.M.; Shea, N.A. [Climax Molybdenum Co., Henderson Operations, Empire, CO (United States)

    2010-07-01

    The average molybdenum ore throughput at the Henderson Mine near Denver, Colorado increased significantly between 2003 and 2007. In response, the Climax Molybdenum Company updated the life-of-mine plan which resulted in significant changes to the ventilation requirements of the mine. This paper outlined the mine and ventilation planning efforts. The design options that were evaluated to upgrade the ventilation system were also described along with the final design that was chosen to support the updated mine plan. The mine uses an exhaust ventilation system in which ventilation is supplied through a service shaft, an intake shaft and a long ore haulage tunnel. Currently, air is exhausted through 2 exhaust shafts. The new reserve model that was completed in 2007 incorporated updated geologic information and mix/dilution models. An evaluation of the new life-of-mine plans and production sequences drove the development of a new ventilation plan that increased the airflow requirements of the mine. The primary design concerns were radon control; reduction of diesel particulate matter; silica dust; blasting and other gases; and climate control. Ventilation requirements were also updated based on the final exposure limits stipulated in the 2008 regulations of the Mine Safety and Health Administration. 4 refs., 11 tabs., 8 figs.

  8. LSST summit facility construction progress report: reacting to design refinements and field conditions

    Science.gov (United States)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  9. Learning Earthquake Design and Construction – 23. Why are ...

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 10; Issue 11. Learning Earthquake Design and Construction – 23. Why are Buildings with Shear Walls Preferred in Seismic Regions? C V R Murty. Classroom Volume 10 Issue 11 November 2005 pp 85-88 ...

  10. Development work for the Japanese LCT coil and its design and construction

    International Nuclear Information System (INIS)

    Shimamoto, Susumu; Ando, Toshinari; Tsuji, Hiroshi; Yasukochi, Ko

    1984-01-01

    This paper describes design, verification tests, and construction of the Japanese test coil for the Large Coil Task (LCT). Japan Atomic Energy Research Institute (JAERI) signed on the LCT international agreement under the International Energy Agency (IEA) in 1978, and since then JAERI has been working to develop the Japanese LCT coil to explore the problems of design and construction of tokamak toroidal coil. Based on the common requirements of the LCT, the Japanese LCT coil was designed to be a pool-cooled NbTi fully-stabilized coil whose operating current is 10,220 A at 8 T. Through research and development of the Japanese LCT coil, new advances in the super-conducting coil technology were obtained, such as mechanically and chemically treated conductor surface that has high heat transfer about four times as much as usual ones, nitrogen-strengthened stainless steel that has the yield strength twice as much as usual stainless steel, NbTi filaments those have the critical current density twice as much as those before LCT, and so on. These advances have enabled to construct the Japanese LCT coil and it was completed in the spring of 1982. During the construction of the coil, new fabrication techniques were obtained to wind large current conductor into a mechanically rigid coil and thus to construct a totally stable large coil. (author)

  11. Greenroads : a sustainability performance metric for roadway design and construction.

    Science.gov (United States)

    2009-11-01

    Greenroads is a performance metric for quantifying sustainable practices associated with roadway design and construction. Sustainability is defined as having seven key components: ecology, equity, economy, extent, expectations, experience and exposur...

  12. Construction and commissioning of workrooms for handling of unsealed radioactive materials

    International Nuclear Information System (INIS)

    Weinhold, G.; Jost, E.; Koenig, W.

    1976-03-01

    The requirements prescribed for planning, design and construction of type II and III workrooms for handling of unsealed sources are outlined. The 'Guide Concerning Construction and Equipment of Rooms for Handling of Radioactive Materials' is explained and supplemented in part. Furthermore, problems of radiation protection organization and measuring techniques are discussed. (author)

  13. Water-related planning and design at energy firms

    International Nuclear Information System (INIS)

    Abbey, D.; Lucero, F.

    1980-11-01

    Water related planning and design at energy firms are examined. By identifying production alternatives and specifying the cost of these alternatives under a variety of conditions, one gains insight into the future pattern of water use in the energy industry and the response of industry to water-related regulation. In Part II, the three principal decisions of industry that affect water allocation are reviewed: where to build plants, where to get water, and how much water to use. The cost of water use alternatives is reviewed. Part III presents empirical data to substantiate the inferences derived from engineering/economic analysis. The source of water, type of cooling system, and pattern of discharge for electric plants constructed during the 1970s or projected to come on line in this decade are reported. In the 1970s in the US, there was a trend away from once-through cooling toward use of evaporative cooling. Freshwater, as a source of supply, and discharge of effluent were standard practice. In the 1980s, almost all new capacity in the states and basins surveyed will use evaporative cooling. It is pointed out that a thorough understanding of industrial water use economics and water markets is a precursor to successful regulation

  14. Construction management and economics: the epistemology of a multidisciplinary design science

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2009-01-01

    Research in the field of construction management and economics (CME) can be characterized as a multidisciplinary design science. Results from the sciences and humanities are necessary inputs for this field of research that deals with design, production and operation of the built environment. The

  15. design and construction of design and construction of pilot scale

    African Journals Online (AJOL)

    eobe

    construction of the extractor, evaporator, condensate receiver and the the extractor, evaporator ... The concept of overall heat transfer coefficient was adopted for calculating the heat ..... Evaporator. Residence time for evaporation = 14070.25s.

  16. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    Science.gov (United States)

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  17. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    Science.gov (United States)

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  18. Design and construction of a resistivity meter for shallow investigation

    African Journals Online (AJOL)

    Design and construction of a resistivity meter for shallow investigation. ... Nigerian Journal of Physics. Journal Home ... Consequently many institutions that need this equipment for teaching and research purposes cannot afford the price.

  19. Review: Improving the Impact of Plant Science on Urban Planning and Design

    Directory of Open Access Journals (Sweden)

    Peter C. Wootton-Beard

    2016-11-01

    Full Text Available Urban planning is a vital process in determining the functionality of future cities. It is predicted that at least two thirds of the world’s citizens will reside in towns and cities by the middle of this century, up from one third in the middle of the previous century. Not only is it essential to provide space for work and dwelling, but also for their well-being. Well-being is inextricably linked with the surrounding environment, and natural landscapes have a potent positive effect. For this reason, the inclusion and management of urban green infrastructure has become a topic of increasing scientific interest. Elements of this infrastructure, including green roofs and façades are of growing importance to operators in each stage of the planning, design and construction process in urban areas. Currently, there is a strong recognition that “green is good”. Despite the positive recognition of urban greenery, and the concerted efforts to include more of it in cities, greater scientific attention is needed to better understand its role in the urban environment. For example, many solutions are cleverly engineered without giving sufficient consideration to the biology of the vegetation that is used. This review contends that whilst “green is good” is a positive mantra to promote the inclusion of urban greenery, there is a significant opportunity to increase the contribution of plant science to the process of urban planning through both green infrastructure, and biomimicry.

  20. On The Designed And Constructed Feedback Shift-Register Encoder

    African Journals Online (AJOL)

    An encoder capable of cyclical shifting of data, and which can therefore be used for Bose-Chaudhuri and Hocquenghem (BCH) coding, has been designed and constructed using discrete components. It comprises basically four bistable multivibrators and an exclusive-OR device. On completion, the encoder performed ...

  1. Radiotherapy Facilities: Master Planning and Concept Design Considerations (Russian Edition)

    International Nuclear Information System (INIS)

    2015-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology and a typical project work plan, and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  2. Design and Construction of Pool Door for Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kwangsub; Lee, Sangjin; Choi, Jinbok; Oh, Jinho; Lee, Jongmin [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The pool door is a structure to isolate the reactor pool from the service pool for maintenance. The pool door is installed before the reactor pool is drained. The pool door consists of structural component and sealing component. The main structures of the pool door are stainless steel plates and side frames. The plates and frames are assembled by welded joints. Lug is welded at the top of the plate. The pool door is submerged in the pool water when it is used. Materials of the pool door should be resistive to corrosion and radiation. Stainless steel is used in structural components and air nozzle assemblies. Features of design and construction of the pool door for the research reactor are introduced. The pool door is designed to isolate the reactor pool for maintenance. Structural analysis is performed to evaluate the structural integrity during earthquake. Tests and inspections are also carried out during construction to identify the safety and function of the pool door.

  3. Design and Construction of Pool Door for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Lee, Sangjin; Choi, Jinbok; Oh, Jinho; Lee, Jongmin

    2016-01-01

    The pool door is a structure to isolate the reactor pool from the service pool for maintenance. The pool door is installed before the reactor pool is drained. The pool door consists of structural component and sealing component. The main structures of the pool door are stainless steel plates and side frames. The plates and frames are assembled by welded joints. Lug is welded at the top of the plate. The pool door is submerged in the pool water when it is used. Materials of the pool door should be resistive to corrosion and radiation. Stainless steel is used in structural components and air nozzle assemblies. Features of design and construction of the pool door for the research reactor are introduced. The pool door is designed to isolate the reactor pool for maintenance. Structural analysis is performed to evaluate the structural integrity during earthquake. Tests and inspections are also carried out during construction to identify the safety and function of the pool door

  4. Design and construction of electronic filters

    International Nuclear Information System (INIS)

    Becerril Z, E.R.; Moreno P, C.; Salinas B, E.

    1979-01-01

    The design and construction of very low frequencies electronic filters which will be used for carrying out analysis of pile noise at Mexico's Nuclear Center Triga Mark III Reactor, in order to realize measurements of its parameters is presented. NIM norms and active filters with lineal integrated circuits were used: a. Band pass filter from 10 to 500 hertz, band width 50. b. Low pass filter from 0.001 to 10 hertz in 3 steps. c. Kalman Bucy filter, an analogical simulation of this filter was undertaken, obtained from a mathematical model of a Zero power experimental reactor, with the purpose to establish a control searching. (author)

  5. Analysis of construction dynamic plan using fuzzy critical path method

    Directory of Open Access Journals (Sweden)

    Kurij Kazimir V.

    2014-01-01

    Full Text Available Critical Path Method (CPM technique has become widely recognized as valuable tool for the planning and scheduling large construction projects. The aim of this paper is to present an analytical method for finding the Critical Path in the precedence network diagram where the duration of each activity is represented by a trapezoidal fuzzy number. This Fuzzy Critical Path Method (FCPM uses a defuzzification formula for trapezoidal fuzzy number and applies it on the total float (slack time for each activity in the fuzzy precedence network to find the critical path. The method presented in this paper is very effective in determining the critical activities and finding the critical paths.

  6. The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects

    Directory of Open Access Journals (Sweden)

    Mary Hardie

    2012-11-01

    Full Text Available Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.

  7. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2011-06-17

    ... developing access to construction trades through the enhancement of construction career pathways and the... providing an opportunity for a 30- day period of public review and written comment. During this time, the... Technology Program $2,400,000 Bulk Fuel/RPSU Planning, Design & $3,770,350 Construction. Renewable Energy...

  8. Handbook of energy use for building construction

    Energy Technology Data Exchange (ETDEWEB)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  9. Handbook of energy use for building construction

    Science.gov (United States)

    Stein, R. G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, railroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. Emphasis is given to new building construction; however, some information for the other parts of the construction industry is also included. Building designers are provided with information to determine the energy required for buildings construction and to evaluate the energy required for alternative materials, assemblies, and methods. It is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  10. Constructive Preference Elicitation

    Directory of Open Access Journals (Sweden)

    Paolo Dragone

    2018-01-01

    Full Text Available When faced with large or complex decision problems, human decision makers (DM can make costly mistakes, due to inherent limitations of their memory, attention, and knowledge. Preference elicitation tools assist the decision maker in overcoming these limitations. They do so by interactively learning the DM’s preferences through appropriately chosen queries and suggesting high-quality outcomes based on the preference estimates. Most state-of-the-art techniques, however, fail in constructive settings, where the goal is to synthesize a custom or entirely novel configuration rather than choosing the best option among a given set of candidates. Many wide-spread problems are constructive in nature: customizing composite goods such as cars and computers, bundling products, recommending touristic travel plans, designing apartments, buildings, or urban layouts, etc. In these settings, the full set of outcomes is humongous and can not be explicitly enumerated, and the solution must be synthesized via constrained optimization. In this article, we describe recent approaches especially designed for constructive problems, outlining the underlying ideas and their differences as well as their limitations. In presenting them, we especially focus on novel issues that the constructive setting brings forth, such as how to deal with sparsity of the DM’s preferences, how to properly frame the interaction, and how to achieve efficient synthesis of custom instances.

  11. Literature Review of Advantages and Disadvantages of Pre-planned Construction Projects 2013 PhD Conference

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    The construction industry’s focus on pre-planning, with its advantages and disadvantages, has not been investigated in a literature review which gives a state of art understanding of the topic. The aim of the paper is to review related papers, to fulfill gaps in the literature which could...

  12. 25 CFR 170.402 - What is the tribal role in transportation planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the tribal role in transportation planning? 170... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation Planning § 170.402 What is the tribal role in transportation planning? (a) All tribes must prepare...

  13. Presentation of the RCC-M design and construction rule

    International Nuclear Information System (INIS)

    Quero, J.R.

    1983-03-01

    Presentation of the French rules for design and construction of nuclear power plant components: stress resistance, material choice, fabrication and quality control, control methodology etc... covering equipments such as pressurized components (tanks, exchangers, pipes, pumps, valves and fittings), internal and support reactor elements and non pressurized small devices [fr

  14. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    Science.gov (United States)

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  15. Site characterization plan: Conceptual design report, Volume 2: Chapters 4-9: Nevada Nuclear Waste Storage Investigations Project

    International Nuclear Information System (INIS)

    MacDougall, H.R.; Scully, L.W.; Tillerson, J.R.

    1987-09-01

    This document presents a description of a prospective geologic repository for high-level radioactive waste to support the development of the Site Characterization Plan for the Yucca Mountain site. The target horizon for waste emplacement is a sloping bed of densely welded tuff more than 650 ft below the surface and typically more than 600 ft above the water table. The conceptual design described in this report is unique among repository designs in that it uses ramps in addition to shafts to gain access to the underground facility, the emplacement horizon is located above the water table, and it is possible that 300- to 400-ft-long horizontal waste emplacement boreholes will be used. This report summarizes the design bases (site and properties of the waste package), design and performance criteria, and the design analyses performed. The current status of meeting the preclosure performance objectives for licensing and of resolving the repository design and preclosure issues is presented. The repository design presented in this report will be expanded and refined during the advanced conceptual design, the license application design, and the final procurement and construction design phases. 147 refs., 145 figs., 83 tabs

  16. Risk management at the stage of design of high-rise construction facilities

    Science.gov (United States)

    Politi, Violetta

    2018-03-01

    This paper describes the assessment of the probabilistic risk of an accident formed in the process of designing a technically complex facility. It considers values of conditional probabilities of the compliance of load-bearing structures with safety requirements, provides an approximate list of significant errors of the designer and analyzes the relationship between the degree of compliance and the level of danger of errors. It describes and proposes for implementation the regulated procedures related to the assessment of the safety level of constructive solutions and the reliability of the construction process participants.

  17. Requirements for the quality assurance of design, planning and construction for power plants

    International Nuclear Information System (INIS)

    Edelmann, J.

    1981-01-01

    One of the main points of effective quality planning and quality assurance are the organizational conditions. The basic foundation is a development organization with a clear definition of tasks and responsibilities as well as determination of the information flow. Here the dividing of the tasks is to be carried out in a manner where the number of transitions - in particular error-critical transitions - between the individual organization units are minimized. (orig.) [de

  18. Reliability-Based Optimal Design of Experiment Plans for Offshore Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Faber, Michael Havbro; Kroon, I. B.

    1993-01-01

    Design of cost optimal experiment plans on the basis of a preposterior analysis is discussed. In particular the planning of on-site response measurements on offshore structures in order to update probabilistic models for fatigue life estimation is addressed. Special emphasis is given to modelling...

  19. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs

  20. Urban Planning and Management Information Systems Analysis and Design Based on GIS

    Science.gov (United States)

    Xin, Wang

    Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.

  1. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  2. The method of using current regulations and standards in designing management and technologies of construction

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available Economic efficiency of using funds in construction of buildings and structures begins from an effective, proper design, which is based on modern, cutting-edge, advanced equipment, streamlined organization and process solutions of construction operations. In the light of this it is considered application of “Self-Organization and Technology of Building” multifunctional software package capable of solving various engineering tasks on designing management of construction operations in accordance with the applicable rules and regulations in view of using software for automatic generation of workflow. Implementing this software in the construction management processes may help to solve management tasks at the construction site.

  3. Materials for construction and civil engineering science, processing, and design

    CERN Document Server

    Margarido, Fernanda

    2015-01-01

    This expansive volume presents the essential topics related to construction materials composition and their practical application in structures and civil installations. The book's diverse slate of expert authors assemble invaluable case examples and performance data on the most important groups of materials used in construction, highlighting aspects such as nomenclature, the properties, the manufacturing processes, the selection criteria, the products/applications, the life cycle and recyclability, and the normalization. Civil Engineering Materials: Science, Processing, and Design is ideal for practicing architects; civil, construction, and structural engineers, and serves as a comprehensive reference for students of these disciplines. This book also: ·       Provides a substantial and detailed overview of traditional materials used in structures and civil infrastructure ·       Discusses properties of natural and synthetic materials in construction and materials' manufacturing processes ·  �...

  4. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  5. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  6. A Theoretical Construct of Serious Play and the Design of a Tangible Social Interface

    Science.gov (United States)

    Jennings, Pamela L.

    To construct is to creatively invent one's world by engaging in creative decision-making, problem solving, and negotiation. The metaphor of construction is used to demonstrate how a simple artifact - a building blockw can be used to facilitate the exploration of personal narratives. This chapter presents an argument for the development of tangible social interfaces and interaction design practices that are informed by the premises of twentieth century philosophical and cultural theories. Specifically, this chapter explores the historical notion of the role of play in constructing a civic society. The constructed narratives' electronic construction kit is introduced as an example of research and development of a critical creative technology built on a wireless ad hoc 802.15.4 network platform. The game is designed to support collaborative play and learning.

  7. Creating a strategic business plan for a Nepalese construction company: a case study of Jhapali International Engineering and Builders

    OpenAIRE

    Basnet, Yugal Kumar

    2013-01-01

    Developing an effective strategy is a vital aspect of business management, which is necessary to survive in the market and achieve the corporate mission and vision. In order to succeed a company must develop a plan of action in their business plan. The formulation of the strategy is central to any business plan. Constructing a detailed business plan will guide the company’s owner to envision the future shape of the company and make the best decisions regarding the company’s business. The rese...

  8. Specific features of modern multifunctional high-rise building construction

    Science.gov (United States)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  9. A Qualitative Comparison on Guidelines for Construction Workers Accommodation and Facility

    OpenAIRE

    Khamis Norasyikin; Suratkon Azeanita; Mohammad Hairuddin; Yaman Siti Khalijah

    2017-01-01

    Construction industry in Malaysia covers almost 1.3 million workers. Thus, realizing the importance of human-centred trait, a long-term plan that is led by the Construction Industry Development Board Malaysia (CIDB) has been designed to improve accommodation and facilities of workers at construction site. In conjunction to that, the Institute for Industrial Research and Standards Malaysia (SIRIM) has developed Malaysia Standard (MS 2593:2015) as the guideline for improvement of accommodation ...

  10. Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects

    OpenAIRE

    Gamil Yaser; Abdul Rahman Ismail; Nagapan Sasitharan; Alemad Nashwan

    2017-01-01

    Large construction projects in Yemen face many impediments and challenges to be completed successfully. This article presents an investigative cases study of three mega construction projects which are considered failed to achieve their assigned plans and objectives. An exploratory interview was implied in this study via telephone to three construction experts who involved directly in these mega projects at the managerial level. Semi-structured questions based on literature were designed as gu...

  11. Design and construction of a magnetic sector mass spectrometer

    International Nuclear Information System (INIS)

    Dallaqua, R.S.; Ludwig, G.O.; Montes, A.

    1991-08-01

    In this work we describe the design and construction of a sector magnetic mass spectrometer. The main parts of the instrument are: ion source, grids (extraction, energy analysis and ion acceleration), electrostatic lens, magnetic sector and detector. All these components are kept inside a vacuum chamber evacuated by a turbomolecular pump. (author)

  12. DESIGN AND CONSTRUCTION OF A HYDRAULIC PISTON

    OpenAIRE

    Santos De la Cruz, Eulogio; Rojas Lazo, Oswaldo; Yenque Dedios, Julio; Lavado Soto, Aurelio

    2014-01-01

    A hydraulic system project includes the design, materials selection and construction of the hydraulic piston, hydraulic circuit and the joint with the pump and its accesories. This equiment will be driven by the force of moving fluid, whose application is in the devices of machines, tools, printing, perforation, packing and others. El proyecto de un sistema hidráulico, comprende el diseño, selección de materiales y construcción del pistón hidráulico, circuito hidráulico y el ensamble con l...

  13. Design and construction of the TIT RFQ

    International Nuclear Information System (INIS)

    Takeda, Osamu; Tanabe, Yoshio; Satoh, Kiyokazu; Kawatsu, Shosi; Okamura, Masahiro; Oguri, Yoshiyuki; Hattori, Toshiyuki.

    1993-01-01

    At Tokyo Institute of Technology (TIT) a four-vane RFQ is to be applied for inertial confinement fusion research. The RFQ(TIT RFQ) is designed for acceleration of particles with charge to mass ratio (q/A) of 1/16 from 5 keV/amu to 213 keV/amu. The planned maximum injection current is 10 mA for 16 O + and beam transmission is expected to be 60% as a result of a PIC code simulation. Structural and thermal analyses were carried out. (author)

  14. The co-constructing stories method : feedback of designers on use of the method in real design cases

    NARCIS (Netherlands)

    Buskermolen, D.; Terken, J.M.B.; Eggen, J.H.

    2015-01-01

    In this paper we present the "Co-constructing Stories" method, aiming to elicit feedback from end-users on novel design concepts in the early phases of the design process. In sessions of less than an hour, participants are prompted by a storyboard depicting the current situation to recollect

  15. Implementation of straight and curved steel girder erection design tools construction : summary.

    Science.gov (United States)

    2010-11-05

    Project 0-5574 Curved Plate Girder Design for Safe and Economical Construction, resulted in the : development of two design tools, UT Lift and UT Bridge. UT Lift is a spreadsheet-based program for analyzing : steel girders during lifting while ...

  16. Plan and present status of synchrotron radiation applications at HESYRL

    International Nuclear Information System (INIS)

    Zhang, Y.; Su, Y.; Qian, S.; Xu, X.; Jiang, D.; Xu, C.

    1985-01-01

    An 800 MeV electron storage ring is being constructed at Hefei, China. It is a dedicated UV synchrotron light source from which 27 beam lines could be extracted to accommodate about 50 experimental stations. Four beam lines and five stations are planned and some instruments have been designed and are under construction for the first five-year plan. The proposed experiments include x-ray lithography, soft x-ray microscopy, photoelectron spectroscopy, time-resolved spectroscopy and photochemistry

  17. Quality of Slab Track Construction – Track Alignment Design and Track Geometry

    Directory of Open Access Journals (Sweden)

    Šestáková Janka

    2015-05-01

    Full Text Available The slab track superstructure design (without ballast is a perspective construction especially for building tunnels and bridges in the modernized sections of railway tracks in Slovakia. Monitoring of the structure described in this article is focused on the transition areas between standard structure with ballast and slab track construction.

  18. Design and construction of a remote piloted flying wing. B.S. Thesis

    Science.gov (United States)

    Costa, Alfred J.; Koopman, Fritz; Soboleski, Craig; Trieu, Thai-Ba; Duquette, Jaime; Krause, Scott; Susko, David; Trieu, Thuyba

    1994-01-01

    Currently, there is a need for a high-speed, high-lift civilian transport. Although unconventional, a flying wing could fly at speeds in excess of Mach 2 and still retain the capacity of a 747. The design of the flying wing is inherently unstable since it lacks a fuselage and a horizontal tail. The project goal was to design, construct, fly, and test a remote-piloted scale model flying wing. The project was completed as part of the NASA/USRA Advanced Aeronautics Design Program. These unique restrictions required us to implement several fundamental design changes from last year's Elang configuration including wing sweepback and wingtip endplates. Unique features such as a single ducted fan engine, composite structural materials, and an electrostatic stability system were incorporated. The result is the Banshee '94. Our efforts will aid future projects in design and construction techniques so that a viable flying wing can become an integral part of the aviation industry.

  19. Flexibility in flood management design: proactive planning under uncertainty

    Science.gov (United States)

    Smet, K.; de Neufville, R.; van der Vlist, M.

    2016-12-01

    This paper presents a value-enhancing approach for proactive planning and design of long-lived flood management infrastructure given uncertain future flooding threats. Designing infrastructure that can be adapted over time is a method to safeguard the efficacy of current design decisions given future uncertainties. We explore the value of embedding "options" in a physical structure, where an option is the right but not the obligation to do something at a later date (e.g. over-dimensioning a floodwall foundation now facilitates a future height addition in response to observed increases in sea level; building extra pump bays in a drainage pumping station enables the easy addition of pumping capacity whenever increased precipitation warrants an expansion.) The proposed approach couples a simulation model that captures future climate induced changes to the hydrologic operating environment of a structure, with an economic model that estimates the lifetime economic performance of alternative investment strategies. The economic model uses Real "In" Options analysis, a type of cash flow analysis that quantifies the implicit value of options and the flexibility they provide. We demonstrate the approach using replacement planning for the multi-functional pumping station IJmuiden on the North Sea Canal in the Netherlands. The analysis models flexibility in design decisions, varying the size and specific options included in the new structure. Results indicate that the incorporation of options within the structural design has the potential to improve its economic performance, as compared to more traditional, "build it once and build it big" designs where flexibility is not an explicit design criterion. The added value resulting from the incorporation of flexibility varies with the range of future conditions considered, and the specific options examined. This approach could be applied to explore investment strategies for the design of other flood management structures, as well

  20. Design and development of the roadbed construction on the soft soils

    Directory of Open Access Journals (Sweden)

    Yushkov Boris Semenovich

    2014-12-01

    Full Text Available Now the considerable part of territories is presented by soft soils. Construction of highways under difficult conditions, in places of the soft heaving soil distribution having an excessive moistening, low bearing capability, high compressibility and other unfavorable properties, significantly complicates and raises the price of road construction. Improvement of technology of highway construction serves as a solution of problem. In this article the authors propose the design of a roadbed on the soft clay soil, strengthened by a spatial geoweb. The experimental studies of four designs were conducted: the first one is research of the roadbed — soft clay soil mutual interaction; the second one is research of work of the geotextile material laid in the base of roadbed with the soft clay soil; the third one is research of work of the spatial geoweb laid in the base of roadbed with the soft clay soil; the fourth one is research of joint action of a spatial geoweb and the geotextile material laid in the base of a roadbed with soft clay soil. Based on the results of the carried-out laboratory tests it has been revealed that the design with strengthening by a spatial geoweb and geotextile material has a rational one of the roadbed.

  1. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 5 Report: Generation IV Reactor Virtual Mockup Proof-of-Principle Study

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Task 5 report is part of a 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Created a virtual mockup of PBMR reactor cavity and discussed applications of virtual mockup technology to improve Gen IV design review, construction planning, and maintenance planning

  2. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 5 Report: Generation IV Reactor Virtual Mockup Proof-of-Principle Study

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 5 report is part of a 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Created a virtual mockup of PBMR reactor cavity and discussed applications of virtual mockup technology to improve Gen IV design review, construction planning, and maintenance planning.

  3. Methods and techniques for decontamination design and construction of facilities

    International Nuclear Information System (INIS)

    Augustin, X.; Cohen, S.

    1986-01-01

    TECHNICATOME and STMI have jointly solved a wide range of problems specific to decontamination from the very design studies up to operation. TECHNICATOME has brought its expertise in the design and construction of nuclear facilities concerned in particular with decontamination and radwaste management. STMI is an experienced operator with expertise in designing tools and developing advanced techniques in the same fields. The expertise of both companies in this field cumulated for many years has resulted in developing techniques and tools adapted to most of the decontamination problems including specific cases [fr

  4. The constructional design of cooling water discharge structures on German rivers

    International Nuclear Information System (INIS)

    Geldner, P.; Zimmermann, C.

    1975-11-01

    The present compilation of structures for discharging cooling water from power stations into rivers is an attempt to make evident developments in the constructional design of such structures and to give reasons for special structure shapes. A complete collection of all structures built in Germany, however, is difficult to realize because of the large number of power stations. For conventionally heated power stations therefore only a selection was made, while nuclear power stations in operation or under construction could almost completely be taken into account. For want of sufficient quantities of water for river water cooling, projected power stations are now almost exclusively designed for closed-circuit cooling so that the required discharge structures for elutrition water from the cooling towers as well as for the emergency and secondary cooling circuits have to be designed only for small amounts of water. (orig./HP) [de

  5. RESEARCH ON THE INTENSITY ANALYSIS AND RESULT VISUALIZATION OF CONSTRUCTION LAND IN URBAN PLANNING

    Directory of Open Access Journals (Sweden)

    J. Cui

    2017-09-01

    Full Text Available As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.

  6. Experience in design and construction of the Log tunnel

    Directory of Open Access Journals (Sweden)

    Jovičić Vojkan

    2017-09-01

    Full Text Available A twin highway Log tunnel is a part of a new motorway connection between Maribor and Zagreb, section Draženci-Gruškovje, which is located towards the border crossing between Slovenia and Croatia. The tunnel is currently under construction, and only the excavation works have been completed during the writing of this paper. The terrain in the area of the Log tunnel is diverse, and the route of the highway in its vicinity is characterised by deep excavations, bridges or viaducts. The Log tunnel is approximately 250 m long, partly constructed as a gallery. The geological conditions are dominated by Miocene base rock, featuring layers of well-connected clastic rocks, which are covered by diluvium clays, silts, sands and gravels of different thicknesses. Due to the short length of the tunnel, the usual separation of the motorway route to the left and the right tunnel axes was not carried out. Thus, the tunnel was constructed with an intermediate pillar and was designed as a three-lane tunnel, including the stopping lane. The construction of the tunnel was carried out using the New Austrian tunnelling method (NATM, in which the central adit was excavated first and the intermediate pillar was constructed within it. The excavation of the main tubes followed and was divided into the top heading, bench and the invert, enabling the intermediate pillar to take the load off the top heading of both tubes. The secondary lining of the tunnel is currently under construction. The experience of the tunnel construction gathered so far is presented in the paper. The main emphasis is on the construction of the intermediate pillar, which had to take the significant and asymmetrical ground load.

  7. Experience in design and construction of the Log tunnel

    Science.gov (United States)

    Jovičić, Vojkan; Goleš, Niko; Tori, Matija; Peternel, Miha; Vajović, Stanojle; Muhić, Elvir

    2017-09-01

    A twin highway Log tunnel is a part of a new motorway connection between Maribor and Zagreb, section Draženci-Gru\\vskovje, which is located towards the border crossing between Slovenia and Croatia. The tunnel is currently under construction, and only the excavation works have been completed during the writing of this paper. The terrain in the area of the Log tunnel is diverse, and the route of the highway in its vicinity is characterised by deep excavations, bridges or viaducts. The Log tunnel is approximately 250 m long, partly constructed as a gallery. The geological conditions are dominated by Miocene base rock, featuring layers of well-connected clastic rocks, which are covered by diluvium clays, silts, sands and gravels of different thicknesses. Due to the short length of the tunnel, the usual separation of the motorway route to the left and the right tunnel axes was not carried out. Thus, the tunnel was constructed with an intermediate pillar and was designed as a three-lane tunnel, including the stopping lane. The construction of the tunnel was carried out using the New Austrian tunnelling method (NATM), in which the central adit was excavated first and the intermediate pillar was constructed within it. The excavation of the main tubes followed and was divided into the top heading, bench and the invert, enabling the intermediate pillar to take the load off the top heading of both tubes. The secondary lining of the tunnel is currently under construction. The experience of the tunnel construction gathered so far is presented in the paper. The main emphasis is on the construction of the intermediate pillar, which had to take the significant and asymmetrical ground load.

  8. Present construction status and future plan of JT-60

    Energy Technology Data Exchange (ETDEWEB)

    Iso, Yasuhiko; Yoshikawa, Masaji [Japan Atomic Energy Research Inst., Tokai, Ibaraki. Tokai Research Establishment

    1982-04-01

    As for the critical plasma test facility JT-60, its detailed design was initiated in 1975, and the manufacture of the main body components was started in April, 1978, through the trial manufacture and development of important components. The manufacture of all the system equipment in factories is in progress. Especially, the essential components of main body have been almost completed, and ready to be installed in the building. The building is under construction, and a part of the equipment was brought in and installed since the beginning of 1982 fiscal year. JT-60 is composed of heating system, toroidal magnetic field coil power supply, poloidal magnetic field coil power supply, total control system, associated system for main body and various measuring equipment as well as the main body which consists of vacuum vessel, toroidal and poloidal magnetic field coils, base, primary cooling system, movable limiter and evacuating system. In this report, first the significance of JT-60 development and the outline of JT-60 are described, and the present construction status is reported. The specifications of the essential equipment of the main body and heating system and the measuring system configuration are listed in tables. The aims in JT-60 design are to make plasma generating pulse width longer, to obtain higher beta value in circular cross-section plasma, to install the magnetic limiter, and to realize compound second stage heating.

  9. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  10. Design and analysis of advanced flight planning concepts

    Science.gov (United States)

    Sorensen, John A.

    1987-01-01

    The objectives of this continuing effort are to develop and evaluate new algorithms and advanced concepts for flight management and flight planning. This includes the minimization of fuel or direct operating costs, the integration of the airborne flight management and ground-based flight planning processes, and the enhancement of future traffic management systems design. Flight management (FMS) concepts are for on-board profile computation and steering of transport aircraft in the vertical plane between a city pair and along a given horizontal path. Flight planning (FPS) concepts are for the pre-flight ground based computation of the three-dimensional reference trajectory that connects the city pair and specifies the horizontal path, fuel load, and weather profiles for initializing the FMS. As part of these objectives, a new computer program called EFPLAN has been developed and utilized to study advanced flight planning concepts. EFPLAN represents an experimental version of an FPS. It has been developed to generate reference flight plans compatible as input to an FMS and to provide various options for flight planning research. This report describes EFPLAN and the associated research conducted in its development.

  11. Problems related to design and construction of industrial radiography exposure room - an experience

    International Nuclear Information System (INIS)

    Siti Madiha Muhammad Amir; Mohd Khairi Mohd Said; Abdul Nassir Ibrahim; Ab Razak Hamzah

    2009-01-01

    In Non-Destructive Testing (NDT), especially in radiography method, inspections of components are executed either on-site or in-house. For in-house inspections, work must be performed in a specially constructed exposure room. The design of the exposure room must be according to specific requirements described in various documents related to radiation safety. Stringent requirements specified for the exposure room is for the purpose of ensuring the safety of public and radiation workers. These requirements are never compromised. One of the AELB requirements that need to be complied is that the permissible dose limit anywhere outside the room must be less than 0.25 mR/hr. In designing and constructing the exposure room, many factors must be taken into account such as shielding thickness, density of shielding, thickness of lead door, the roof design of the exposure room and many more. This paper highlights problems encountered and the considerations taken to design and construct the exposure room so that the exposure room will comply with the permissible dose limit set by the regulatory body. (Author)

  12. Constructed Wetlands for Treatment of Combined Sewer Overflow in the US: A Review of Design Challenges and Application Status

    Directory of Open Access Journals (Sweden)

    Wendong Tao

    2014-11-01

    Full Text Available As combined sewer systems and centralized wastewater treatment facilities age, many communities in the world are challenged by management of combined sewer overflow (CSO. Constructed wetlands are considered to be one of the green infrastructure solutions to CSOs in the US. Despite the wide application of constructed wetlands to different types of wastewaters, the stochastic and intermittent nature of CSO presents challenges for design and performance assessment of constructed wetlands. This paper reviews the application status of CSO constructed wetlands in the US, assesses the benefits of CSO constructed wetlands, identifies challenges to designing CSO constructed wetlands, and proposes design considerations. This review finds that constructed wetlands are effective in CSO treatment and relatively less expensive to build than comparable grey infrastructure. Constructed wetlands not only remove pollutants, but also mitigate the event-associated flow regime. The design challenges include incorporating considerations of green infrastructure into permit requirements, determining design capacity for highly variable flows, requiring pretreatment, and needing adaptive design and intensive monitoring. Simultaneous monitoring of flow rate and water quality at both the inflow and outflow of CSO constructed wetlands is required for performance assessment and needed to support design, but is rarely available.

  13. Design and construction of the X-2 two-stage free piston driven expansion tube

    Science.gov (United States)

    Doolan, Con

    1995-01-01

    This report outlines the design and construction of the X-2 two-stage free piston driven expansion tube. The project has completed its construction phase and the facility has been installed in the new impulsive research laboratory where commissioning is about to take place. The X-2 uses a unique, two-stage driver design which allows a more compact and lower overall cost free piston compressor. The new facility has been constructed in order to examine the performance envelope of the two-stage driver and how well it couple to sub-orbital and super-orbital expansion tubes. Data obtained from these experiments will be used for the design of a much larger facility, X-3, utilizing the same free piston driver concept.

  14. Design, construction, and analysis of specific zinc finger nucleases for microphthalmia - associate transcription factor

    Directory of Open Access Journals (Sweden)

    Wenwen Wang

    2012-08-01

    Full Text Available This work studied the design, construction, and cleavage analysis of zinc finger nucleases (ZFNs that could cut the specific sequences within microphthalmia - associate transcription factor (mitfa of zebra fish. The target site and ZFPs were selected and designed with zinc finger tools, while the ZFPs were synthesized using DNAWorks and two-step PCR. The ZFNs were constructed, expressed, purified, and analyzed in vitro. As expected, the designed ZFNs could create a double-stand break (DSB at the target site in vitro. The DNAWorks, two-step PCR, and an optimized process of protein expression were firstly induced in the construction of ZFNs successfully, which was an effective and simplified protocol. These results could be useful for further application of ZFNs - mediated gene targeting.

  15. Design and Construction of Manned Lunar Base

    Science.gov (United States)

    Li, Zhijie

    2016-07-01

    Building manned lunar base is one of the core aims of human lunar exploration project, which is also an important way to carry out the exploitation and utilization of lunar in situ resources. The most important part of manned lunar base is the design and construction of living habitation and many factors should be considered including science objective and site selection. Through investigating and research, the scientific goals of manned lunar base should be status and characteristics ascertainment of lunar available in situ resources, then developing necessary scientific experiments and utilization of lunar in situ resources by using special environment conditions of lunar surface. The site selection strategy of manned lunar base should rely on scientific goals according to special lunar surface environment and engineering capacity constraints, meanwhile, consulting the landing sites of foreign unmanned and manned lunar exploration, and choosing different typical regions of lunar surface and analyzing the landform and physiognomy, reachability, thermal environment, sunlight condition, micro meteoroids protection and utilization of in situ resources, after these steps, a logical lunar living habitation site should be confirmed. This paper brings out and compares three kinds of configurations with fabricating processes of manned lunar base, including rigid module, flexible and construction module manned lunar base. 1.The rigid habitation module is usually made by metal materials. The design and fabrication may consult the experience of space station, hence with mature technique. Because this configuration cannot be folded or deployed, which not only afford limit working and living room for astronauts, but also needs repetitious cargo transit between earth and moon for lunar base extending. 2. The flexible module habitation can be folded in fairing while launching. When deploying on moon, the configuration can be inflatable or mechanically-deployed, which means under

  16. Design, construction and testing of a low-cost flat plate solar energy ...

    African Journals Online (AJOL)

    A low-cost flat plate solar energy collector has been designed and constructed with locally available materials such as mild steel and black paint of absorptance 0.94. On testing, an average daily efficiency of 55.6% was obtained. The methods are simple and illustrate the fact that construction of efficient collectors are ...

  17. Recent evolutions of French design and construction rules

    Energy Technology Data Exchange (ETDEWEB)

    Lambs, R.; Grandemange, J.M. [Framatome ANP GmbH - NBTT, Erlangen (Germany); Paris, D.; Faidy, C. [Electricite de France (EDF), 75 - Paris (France)

    2001-07-01

    This paper summarises the studies and evaluations made in order to support the recent evolutions of the French Design and Construction Rules, with the objective to improve the competitiveness of nuclear power plants. To this aim, an inquiry was conducted with Suppliers, in order to identify the topics corresponding to cost reduction potentials. Following this inquiry, the RCC-M construction code provisions which may be improved in order to reduce the cost were identified and highlighted compared to the others cost-intensive requirements falling outside the code scope. In parallel, other non-nuclear codes, such as CODAP and CODETI in France for Vessels, heat exchangers and piping, and ASME VIII were analysed in order to evaluate the possibility to refer to more standard alternatives for safety related mechanical components. In such a case, eventual complementary requirements should be specified, and some exercises of application were conducted with the suppliers on typical examples. In order to finalize the overview, return of operating experience was addressed and discussed with the Safety Authority, leading to complementary precautions, in particular on fatigue and fast fracture prevention. The corresponding revisions have been included in the 2000 edition of the RCC-M construction code. (author)

  18. Recent evolutions of French design and construction rules

    International Nuclear Information System (INIS)

    Lambs, R.; Grandemange, J.M.; Paris, D.; Faidy, C.

    2001-01-01

    This paper summarises the studies and evaluations made in order to support the recent evolutions of the French Design and Construction Rules, with the objective to improve the competitiveness of nuclear power plants. To this aim, an inquiry was conducted with Suppliers, in order to identify the topics corresponding to cost reduction potentials. Following this inquiry, the RCC-M construction code provisions which may be improved in order to reduce the cost were identified and highlighted compared to the others cost-intensive requirements falling outside the code scope. In parallel, other non-nuclear codes, such as CODAP and CODETI in France for Vessels, heat exchangers and piping, and ASME VIII were analysed in order to evaluate the possibility to refer to more standard alternatives for safety related mechanical components. In such a case, eventual complementary requirements should be specified, and some exercises of application were conducted with the suppliers on typical examples. In order to finalize the overview, return of operating experience was addressed and discussed with the Safety Authority, leading to complementary precautions, in particular on fatigue and fast fracture prevention. The corresponding revisions have been included in the 2000 edition of the RCC-M construction code. (author)

  19. Recycling-friendly planning and construction; Recyclinggerechtes Planen und Bauen

    Energy Technology Data Exchange (ETDEWEB)

    Willkomm, W. [Hannover Univ. (Germany). Fachbereich Architektur]|[Institut fuer Industrialisierung des Bauens GmbH, Hannover (Germany)

    1995-09-01

    Building materials recycling is part and parcel of any intelligent, resource-conserving materials recycling concept. Principally, however, it can never be more than the second best solution. This is because it must always come after all has been done to prevent building material residues from arising in the first place. The greatest potential for waste avoidance in the building industry lies in the planning phase. Planning nowadays is oriented more to production, utilisation, reutilisation, maintenance, and recycling processes, i.e. more to processes in general than to the design of any certain product. (orig./HW) [Deutsch] Baustoff-Recycling ist ein unverzichtbarer Beitrag zu intelligenten, resourcensparenden Materialkreislaeufen. Es stellt aber immer nur die zweitbeste Loesung dar. Denn zunaechst muessen alle Moeglichkeiten genutzt werden. Bauabfaelle gar nicht erst entstehen zu lassen. Die groessten Potentiale zur Abfallvermeidung in der Bauproduktion liegen in einer Bauplanung, die sich intensiver als bisher an Herstellungs-, Nutzungs-, Umnutzungs-, Instandhaltungs- und Recyclingprozessen orientiert, also eher prozessorientierte Planung als Produktgestaltung. (orig./HW)

  20. Design and construction of the mineral insulated magnets

    International Nuclear Information System (INIS)

    Kurokawa, S.; Hirabayashi, H.; Taino, M.; Tsuchiya, K.; Yamamoto, A.

    1978-01-01

    The radiation resistant magnets with mineral insulated coils are designed and constructed. The electrical insulation of the cable is maintained by magnesium oxide in the form of a powder held around the copper hollow conductor by a copper shieth. By the direct water cooling through a hollow conductor the sometimes conflicting requirements of good insulation and high field are fulfilled. The magnets can with stand more than 10 12 rad of absorbed dose. (author)

  1. Are we developing walkable suburbs through urban planning policy? Identifying the mix of design requirements to optimise walking outcomes from the 'Liveable Neighbourhoods' planning policy in Perth, Western Australia.

    Science.gov (United States)

    Hooper, Paula; Knuiman, Matthew; Bull, Fiona; Jones, Evan; Giles-Corti, Billie

    2015-05-16

    Planning policy makers and practitioners are requesting clearer guidance on the 'essential' ingredients as assessed by public health researchers to ensure suburban neighbourhood environments are designed to promote active living behaviours such as walking. To identify the combination of design requirements from the 'Liveable Neighbourhoods' (LN) planning policy in Perth, Western Australia that were optimally supportive of walking. K-means cluster analysis identified groups of developments with homogeneous LN features from its community design (CD), movement network (MN), lot layout (LL) and public parkland (PP) elements. Walking behaviours measured using the Neighbourhood Physical Activity Questionnaire were compared between participants resident in the different clusters, adjusting for demographic characteristics, self-selection factors, stage of construction and scale of development. Compared with participants living in the referent cluster of 'poor CD and PP developments' those living in: 'MN and LL developments' had higher odds of doing any (OR = 1.74; 95 % CI = 1.22, 2.48) and ≥60 min walking for recreation (WR) (OR = 2.05; 1.46, 2.88); 'PP developments' had increased odds of doing any WR (OR = 3.53; 2.02, 6.17), ≥60 min WR (OR = 3.37; 1.98, 5.74) and any total walking (TW) (OR = 2.35; 1.36, 4.09); 'CD-MN developments' had increased odds of doing any walking for transport (WT) (OR = 2.64; 1.38, 5.06), ≥60 min WT (OR = 1.98; 1.09, 3.61), any TW (OR = 1.71; 1.44, 2.03), ≥60 min TW (OR = 1.77; 1.14, 2.76) and ≥150 min TW (OR = 1.47; 1.15, 1.86). This study is the first to have empirically identified a mix of specific and distinguishing planning policy neighbourhood design requirements to optimise walking outcomes. These findings will assist in the assessment of urban plans for greenfield suburban developments designed to promote walking and physical activity.

  2. Tunnel boring waste test plan

    International Nuclear Information System (INIS)

    Patricio, J.G.

    1984-03-01

    The test plan has been prepared in anticipation of the need to excavate certain repository openings by relying upon mechanical excavation techniques. The test plan proposes that specific technical issues can be resolved and key design parameters defined by excavating openings in basalt near the surface, utilizing a full face tunnel boring machine (TBM). The purpose and objective of this type of testing will define the overall feasibility and attributes of mechanical excavation in basalt. The test plan recognizes that although this technology is generally available for underground construction for some geologic settings, the current state of technology for excavation in basalt is limited and the potential for improvement is considerable. The test plan recommends that it is economically advantageous to conduct additional testing in the laboratory to allow refinement of this plan based on the laboratory results. Thus, this test plan is considered preliminary in nature, with respect to detailed testing recommendations. However, the gross design attributes and resource requirements of a near-surface TBM demonstration are considered to be valid. 15 refs., 7 figs., 3 tabs

  3. National Ignition Facility project acquisition plan

    International Nuclear Information System (INIS)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF

  4. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    Science.gov (United States)

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  5. A Novel CAPP System Based on SML for Variant Design of Process Planning

    Institute of Scientific and Technical Information of China (English)

    ZHAO Haibin; WANG Junying; ZHANG Min

    2006-01-01

    The production model of "multi-specification and low-quantity" is becoming the main trend of manufacturing industry. As a key activity in the manufacturing chain, traditional computer aided process planning (CAPP) system fails to adapt to the production model of customization. Therefore, a novel method for variant design of process planning was proposed to develop CAPP system based on Tabular Layouts of Article Characteristics (Sach-Merk Leisten in German and SML for short). With the support of standard database of master process planning documents which are developed by parameterization technique, and instance process planning for special product (instance product) can be generated automatically by the sub-system of variant design of process planning. Finally, a CAPP system was developed for process design of rotor of steam turbine to validate the feasibility and applicability of the method.

  6. Cosmopolitanism and Its Sociomaterial Construction in the Servicescape

    DEFF Research Database (Denmark)

    Figueiredo, Bernardo; Bean, Jonathan; Pico Larsen, Hanne

    2018-01-01

    to retail brand ideology, branded and themed spaces. By examining cosmopolitanism as an ideology that informs the servicescape, we suggest a shift away from understanding the consumption of cosmopolitanism as a descriptive inventory of consumer traits, preferences, and behaviors, to instead understanding......, and analysis of the floor plan and design of Samuelsson’s restaurant. By analyzing how the servicescape offers narrative templates and resources for cosmopolitan consumers’ experience and re-construction of identity, we link current thinking about cosmopolitanism with the sociomaterial construction...

  7. Predicting sugar-sweetened behaviours with theory of planned behaviour constructs: Outcome and process results from the SIPsmartER behavioural intervention.

    Science.gov (United States)

    Zoellner, Jamie M; Porter, Kathleen J; Chen, Yvonnes; Hedrick, Valisa E; You, Wen; Hickman, Maja; Estabrooks, Paul A

    2017-05-01

    Guided by the theory of planned behaviour (TPB) and health literacy concepts, SIPsmartER is a six-month multicomponent intervention effective at improving SSB behaviours. Using SIPsmartER data, this study explores prediction of SSB behavioural intention (BI) and behaviour from TPB constructs using: (1) cross-sectional and prospective models and (2) 11 single-item assessments from interactive voice response (IVR) technology. Quasi-experimental design, including pre- and post-outcome data and repeated-measures process data of 155 intervention participants. Validated multi-item TPB measures, single-item TPB measures, and self-reported SSB behaviours. Hypothesised relationships were investigated using correlation and multiple regression models. TPB constructs explained 32% of the variance cross sectionally and 20% prospectively in BI; and explained 13-20% of variance cross sectionally and 6% prospectively. Single-item scale models were significant, yet explained less variance. All IVR models predicting BI (average 21%, range 6-38%) and behaviour (average 30%, range 6-55%) were significant. Findings are interpreted in the context of other cross-sectional, prospective and experimental TPB health and dietary studies. Findings advance experimental application of the TPB, including understanding constructs at outcome and process time points and applying theory in all intervention development, implementation and evaluation phases.

  8. Optics Supply Planning System

    International Nuclear Information System (INIS)

    Gaylord, J.

    2009-01-01

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  9. SU-E-T-595: Design of a Graphical User Interface for An In-House Monte Carlo Based Treatment Planning System: Planning and Contouring Tools

    International Nuclear Information System (INIS)

    EMAM, M; Eldib, A; Lin, M; Li, J; Chibani, O; Ma, C

    2014-01-01

    Purpose: An in-house Monte Carlo based treatment planning system (MC TPS) has been developed for modulated electron radiation therapy (MERT). Our preliminary MERT planning experience called for a more user friendly graphical user interface. The current work aimed to design graphical windows and tools to facilitate the contouring and planning process. Methods: Our In-house GUI MC TPS is built on a set of EGS4 user codes namely MCPLAN and MCBEAM in addition to an in-house optimization code, which was named as MCOPTIM. Patient virtual phantom is constructed using the tomographic images in DICOM format exported from clinical treatment planning systems (TPS). Treatment target volumes and critical structures were usually contoured on clinical TPS and then sent as a structure set file. In our GUI program we developed a visualization tool to allow the planner to visualize the DICOM images and delineate the various structures. We implemented an option in our code for automatic contouring of the patient body and lungs. We also created an interface window displaying a three dimensional representation of the target and also showing a graphical representation of the treatment beams. Results: The new GUI features helped streamline the planning process. The implemented contouring option eliminated the need for performing this step on clinical TPS. The auto detection option for contouring the outer patient body and lungs was tested on patient CTs and it was shown to be accurate as compared to that of clinical TPS. The three dimensional representation of the target and the beams allows better selection of the gantry, collimator and couch angles. Conclusion: An in-house GUI program has been developed for more efficient MERT planning. The application of aiding tools implemented in the program is time saving and gives better control of the planning process

  10. DATA TRANSFER IN THE AUTOMATED SYSTEM OF PARALLEL DESIGN AND CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Volkov Andrey Anatol'evich

    2012-12-01

    Full Text Available This article covers data transfer processes in the automated system of parallel design and construction. The authors consider the structure of reports used by contractors and clients when large-scale projects are implemented. All necessary items of information are grouped into three levels, and each level is described by certain attributes. The authors drive a lot of attention to the integrated operational schedule as it is the main tool of project management. Some recommendations concerning the forms and the content of reports are presented. Integrated automation of all operations is a necessary condition for the successful implementation of the new concept. The technical aspect of the notion of parallel design and construction also includes the client-to-server infrastructure that brings together all process implemented by the parties involved into projects. This approach should be taken into consideration in the course of review of existing codes and standards to eliminate any inconsistency between the construction legislation and the practical experience of engineers involved into the process.

  11. Baby MIND Experiment Construction Status arXiv

    CERN Document Server

    Antonova, M.; Bayes, R.; Benoit, P.; Blondel, A.; Bogomilov, M.; Bross, A.; Cadoux, F.; Cervera, A.; Chikuma, N.; Dudarev, A.; Ekelöf, T.; Favre, Y.; Fedotov, S.; Hallsjö, S-P.; Izmaylov, A.; Karadzhov, Y.; Khabibullin, M.; Khotyantsev, A.; Kleymenova, A.; Koga, T.; Kostin, A.; Kudenko, Y.; Likhacheva, V.; Martinez, B.; Matev, R.; Medvedeva, M.; Mefodiev, A.; Minamino, A.; Mineev, O.; Nessi, M.; Nicola, L.; Noah, E.; Ovsiannikova, T.; Pais Da Silva, H.; Parsa, S.; Rayner, M.; Rolando, G.; Shaykhiev, A.; Simion, P.; Soler, F.J.P.; Suvorov, S.; Tsenov, R.; Ten Kate, H.; Vankova-Kirilova, G.; Yershov, N.

    Baby MIND is a magnetized iron neutrino detector, with novel design features, and is planned to serve as a downstream magnetized muon spectrometer for the WAGASCI experiment on the T2K neutrino beam line in Japan. One of the main goals of this experiment is to reduce systematic uncertainties relevant to CP-violation searches, by measuring the neutrino contamination in the anti-neutrino beam mode of T2K. Baby MIND is currently being constructed at CERN, and is planned to be operational in Japan in October 2017.

  12. Methodology of environmental diagnosis for construction and demolition waste landfills: a tool for planning and making decisions.

    Science.gov (United States)

    Garrido, E; Calvo, F; Ramos, A F; Zamorano, M

    2005-11-01

    Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.

  13. 7 CFR 3560.71 - Construction financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  14. Design and construction of a strain gage compression load cell to measure rolling forces

    International Nuclear Information System (INIS)

    Schoeffer, L.; Borchardt, I.G.; Carvalho, L.F.A.

    1978-05-01

    A complete detailed mechanical desion of a strain gauge compression load cell is presented. This cell was specialy designed to measure rolling forces at conventional duo or trio industrial roughing stands. The stands, in general, have little space (height) to adjust to the cells. Moreover the contact stands surfaces are very rough. Do to this facts, load cells of elastic cilindrical geometries are not recommended for accuracies better than 8%. This work describes the complete design and the construction of a circular (membrane) steel plate load cell. A prototype of 300 KN (approximately 30t) capacity, with 2% accuracies and with a height of 6 cm was constructed and tested. The design proposed is a general one and permits the construction of small load cells to measure any compression load [pt

  15. The design, construction and implementation of a computerised trauma registry in a developing South African metropolitan trauma service.

    Science.gov (United States)

    Laing, G L; Bruce, J L; Aldous, C; Clarke, D L

    2014-01-01

    The Pietermaritzburg Metropolitan Trauma Service formerly lacked a robust computerised trauma registry. This made surgical audit difficult for the purpose of quality of care improvement and development. We aimed to design, construct and implement a computerised trauma registry within our service. Twelve months following its implementation, we sought to examine and report on the quality of the registry. Formal ethical approval to maintain a computerised trauma registry was obtained prior to undertaking any design and development. Appropriate commercial software was sourced to develop this project. The registry was designed as a flat file. A flat file is a plain text or mixed text and binary file which usually contains one record per line or physical record. Thereafter the registry file was launched onto a secure server. This provided the benefits of access security and automated backups. Registry training was provided to clients by the developer. The exercise of data capture was then integrated into the process of service delivery, taking place at the endpoint of patient care (discharge, transfer or death). Twelve months following its implementation, the compliance rates of data entry were measured. The developer of this project managed to design, construct and implement an electronic trauma registry into the service. Twelve months following its implementation the data were extracted and audited to assess the quality. A total of 2640 patient entries were captured onto the registry. Compliance rates were in the order of eighty percent and client satisfaction rates were high. A number of deficits were identified. These included the omission of weekend discharges and underreporting of deaths. The construction and implementation of the computerised trauma registry was the beginning of an endeavour to continue improvements in the quality of care within our service. The registry provided a reliable audit at twelve months post implementation. Deficits and limitations were

  16. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  17. Conclusion - Sustainable Energy Landscapes: Designing, Planning, and Development

    NARCIS (Netherlands)

    Stremke, S.; Dobbelsteen, van den A.

    2013-01-01

    Book abstract: The goal of advancing eco cities often remains confined to political or technological issues. This book establishes a focus on architectural and infrastructural design approaches to sustainable urban planning. Starting out from a critical assessment of five prototypical eco cities of

  18. The quality estimation of exterior wall’s and window filling’s construction design

    Science.gov (United States)

    Saltykov, Ivan; Bovsunovskaya, Maria

    2017-10-01

    The article reveals the term of “artificial envelope” in dwelling building. Authors offer a complex multifactorial approach to the design quality estimation of external fencing structures, which is based on various parameters impact. These referred parameters are: functional, exploitation, cost, and also, the environmental index is among them. The quality design index Qк is inputting for the complex characteristic of observed above parameters. The mathematical relation of this index from these parameters is the target function for the quality design estimation. For instance, the article shows the search of optimal variant for wall and window designs in small, middle and large square dwelling premises of economic class buildings. The graphs of target function single parameters are expressed for the three types of residual chamber’s dimensions. As a result of the showing example, there is a choice of window opening’s dimensions, which make the wall’s and window’s constructions properly correspondent to the producible complex requirements. The authors reveal the comparison of recommended window filling’s square in accordance with the building standards, and the square, due to the finding of the optimal variant of the design quality index. The multifactorial approach for optimal design searching, which is mentioned in this article, can be used in consideration of various construction elements of dwelling buildings in accounting of suitable climate, social and economic construction area features.

  19. Recurrent Neural Network Model for Constructive Peptide Design.

    Science.gov (United States)

    Müller, Alex T; Hiss, Jan A; Schneider, Gisbert

    2018-02-26

    We present a generative long short-term memory (LSTM) recurrent neural network (RNN) for combinatorial de novo peptide design. RNN models capture patterns in sequential data and generate new data instances from the learned context. Amino acid sequences represent a suitable input for these machine-learning models. Generative models trained on peptide sequences could therefore facilitate the design of bespoke peptide libraries. We trained RNNs with LSTM units on pattern recognition of helical antimicrobial peptides and used the resulting model for de novo sequence generation. Of these sequences, 82% were predicted to be active antimicrobial peptides compared to 65% of randomly sampled sequences with the same amino acid distribution as the training set. The generated sequences also lie closer to the training data than manually designed amphipathic helices. The results of this study showcase the ability of LSTM RNNs to construct new amino acid sequences within the applicability domain of the model and motivate their prospective application to peptide and protein design without the need for the exhaustive enumeration of sequence libraries.

  20. Computational model-informed design and bioprinting of cell-patterned constructs for bone tissue engineering.

    Science.gov (United States)

    Carlier, Aurélie; Skvortsov, Gözde Akdeniz; Hafezi, Forough; Ferraris, Eleonora; Patterson, Jennifer; Koç, Bahattin; Van Oosterwyck, Hans

    2016-05-17

    Three-dimensional (3D) bioprinting is a rapidly advancing tissue engineering technology that holds great promise for the regeneration of several tissues, including bone. However, to generate a successful 3D bone tissue engineering construct, additional complexities should be taken into account such as nutrient and oxygen delivery, which is often insufficient after implantation in large bone defects. We propose that a well-designed tissue engineering construct, that is, an implant with a specific spatial pattern of cells in a matrix, will improve the healing outcome. By using a computational model of bone regeneration we show that particular cell patterns in tissue engineering constructs are able to enhance bone regeneration compared to uniform ones. We successfully bioprinted one of the most promising cell-gradient patterns by using cell-laden hydrogels with varying cell densities and observed a high cell viability for three days following the bioprinting process. In summary, we present a novel strategy for the biofabrication of bone tissue engineering constructs by designing cell-gradient patterns based on a computational model of bone regeneration, and successfully bioprinting the chosen design. This integrated approach may increase the success rate of implanted tissue engineering constructs for critical size bone defects and also can find a wider application in the biofabrication of other types of tissue engineering constructs.