WorldWideScience

Sample records for planning approach final

  1. Repository documentation rethought. A comprehensive approach from untreated waste to waste packages for final disposal

    Energy Technology Data Exchange (ETDEWEB)

    Anthofer, Anton Philipp; Schubert, Johannes [VPC GmbH, Dresden (Germany)

    2017-11-15

    The German Act on Reorganization of Responsibility for Nuclear Disposal (Entsorgungsuebergangsgesetz (EntsorgUebG)) adopted in June 2017 provides the energy utilities with the new option of transferring responsibility for their waste packages to the Federal Government. This is conditional on the waste packages being approved for delivery to the Konrad final repository. A comprehensive approach starts with the dismantling of nuclear facilities and extends from waste disposal and packaging planning to final repository documentation. Waste package quality control measures are planned and implemented as early as in the process qualification stage so that the production of waste packages that are suitable for final deposition can be ensured. Optimization of cask and loading configuration can save container and repository volume. Workflow planning also saves time, expenditure and exposure time for personnel at the facilities. VPC has evaluated this experience and developed it into a comprehensive approach.

  2. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    International Nuclear Information System (INIS)

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ''a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...''. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State's Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixed waste

  3. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  4. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  5. Vector-model-supported approach in prostate plan optimization

    International Nuclear Information System (INIS)

    Liu, Eva Sau Fan; Wu, Vincent Wing Cheung; Harris, Benjamin; Lehman, Margot; Pryor, David; Chan, Lawrence Wing Chi

    2017-01-01

    Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100 previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration

  6. Vector-model-supported approach in prostate plan optimization

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Eva Sau Fan [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong); Wu, Vincent Wing Cheung [Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong); Harris, Benjamin [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); Lehman, Margot; Pryor, David [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); School of Medicine, University of Queensland (Australia); Chan, Lawrence Wing Chi, E-mail: wing.chi.chan@polyu.edu.hk [Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong)

    2017-07-01

    Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100 previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration

  7. An Asset-Based Approach to Tribal Community Energy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Rachael A. [Pratt Inst., Brooklyn, NY (United States). City and Regional Planning; Martino, Anthony [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Materials, Devices, and Energy Technologies; Begay, Sandra K. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Materials, Devices, and Energy Technologies

    2016-08-01

    Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

  8. 76 FR 61379 - Final Recovery Plan, Bexar County Karst Invertebrates

    Science.gov (United States)

    2011-10-04

    ...] Final Recovery Plan, Bexar County Karst Invertebrates AGENCY: Fish and Wildlife Service, Interior... availability of our final recovery plan, for the nine Bexar County Karst Invertebrates under the Endangered... County karst invertebrates were listed as endangered species on December 26, 2000 (65 FR 81419): Rhadine...

  9. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  10. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    Science.gov (United States)

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  11. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  12. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    Science.gov (United States)

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  13. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  14. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  15. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  16. Clinical Significance: a Therapeutic Approach Topsychological Assessment in Treatment Planning

    Directory of Open Access Journals (Sweden)

    Afolabi Olusegun Emmanuel

    2015-06-01

    Full Text Available Psychological assessment has long been reported as a key component of clinical psychology. This paper examines the complexities surrounding the clinical significance of therapeutic approach to treatment planning. To achieve this objective, the paper searched and used the PsycINFO and PubMed databases and the reference sections of chapters and journal articles to analysed, 1 a strong basis for the usage of therapeutic approach to psychological assessment in treatment plans, 2 explained the conceptual meaning of clinical significant change in therapeutic assessment, 3 answered some of the questions regarding practicability and the clinical significance of therapeutic approach to treatment plans, particularly during or before treatment, 4 linked therapeutic assessment to change in clients’ clinical impression, functioning and therapeutic needs 5 analysed the empirically documenting clinically significant change in therapeutic assessment. Finally, the study suggested that though therapeutic assessment is not sufficient for the systematic study of psychotherapy outcome and process, it is still consistent with both the layman and professional expectations regarding treatment outcome and also provides a precise method for classifying clients as ‘changed’ or ‘unchanged’ on the basis of clinical significance criteria.

  17. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  18. A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated

    Science.gov (United States)

    Liu, Shang; Shi, Dongyan; Zhang, Ying

    Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.

  19. Systematic Approach for Decommissioning Planning and Estimating

    International Nuclear Information System (INIS)

    Dam, A. S.

    2002-01-01

    Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises

  20. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  1. An Approach for Practical Multiobjective IMRT Treatment Planning

    International Nuclear Information System (INIS)

    Craft, David; Halabi, Tarek; Shih, Helen A.; Bortfeld, Thomas

    2007-01-01

    Purpose: To introduce and demonstrate a practical multiobjective treatment planning procedure for intensity-modulated radiation therapy (IMRT) planning. Methods and Materials: The creation of a database of Pareto optimal treatment plans proceeds in two steps. The first step solves an optimization problem that finds a single treatment plan which is close to a set of clinical aspirations. This plan provides an example of what is feasible, and is then used to determine mutually satisfiable hard constraints for the subsequent generation of the plan database. All optimizations are done using linear programming. Results: The two-step procedure is applied to a brain, a prostate, and a lung case. The plan databases created allow for the selection of a final treatment plan based on the observed tradeoffs between the various organs involved. Conclusions: The proposed method reduces the human iteration time common in IMRT treatment planning. Additionally, the database of plans, when properly viewed, allows the decision maker to make an informed final plan selection

  2. Physical treatment planning by several approaches

    International Nuclear Information System (INIS)

    Burger, G.; Morhart, A.; Wittmann, A.

    1985-01-01

    Neutron isodose planning may be performed by commercial treatment planning systems for photons, providing that certain modifications are applied. All geometry-related corrections such as for nonregular surfaces and oblique incidence remain unchanged. The main modifications concern the tissue-air-ratio, containing essentially the attenuation correction function. We have as a first step applied this modified commercial system to a few regular exposure situations in a homogenious water phantom and compared the generated isodose charts with those derived by direct Monte Carlo calculations of the neutron transport for the corresponding fields. As expected the commercial methods do not incorporate the necessary corrections for the change of scatter conditions in case of oblique incidence or wedged fields. For this reason we developed another approach, based upon the numerical superposition of dose matrices for pencil beams. These matrices were again Monte Carlo calculated. From it build-up functions can be derived by partial radial integration. The isodose charts generated by superposition of pencil beam dose distributions agree much better with directly Monte Carlo calculated ones, than those from the commercial treatment planning system. Based upon these results the method was finally applied to real patients cross sections, as derived from CT or MR-tomography. In the latter case one can even perform a pixelwise attenuation correction, if spin density images are available

  3. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Science.gov (United States)

    2011-11-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact.... ACTION: Notice of availability of the Final Environmental Impact Statement for the Winter Use Plan... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and [[Page 68504

  4. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  5. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  6. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Science.gov (United States)

    2012-12-12

    ...] Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone National... Availability of Amended Record of Decision for the Final Environmental Impact Statement for a Winter Use Plan... Record of Decision for the Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and...

  7. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  8. FOCUS: a fire management planning system -- final report

    Science.gov (United States)

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  9. Systemic Planning: Dealing with Complexity by a Wider Approach to Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    2005-01-01

    and methodology that can be helpful for planning under circumstances characterised by complexity and uncertainty. It is argued that compared to conventional, planning – referred to as systematic planning - there is a need for a wider, more systemic approach to planning that is better suited to current real......On the basis of a new book Systemic Planning this paper addresses systems thinking and complexity in a context of planning. Specifically, renewal of planning thinking on this background is set out as so-called systemic planning (SP). The principal concern of SP is to provide principles...

  10. Handling uncertainty through adaptiveness in planning approaches

    NARCIS (Netherlands)

    Zandvoort, M.; Vlist, van der M.J.; Brink, van den A.

    2018-01-01

    Planners and water managers seek to be adaptive to handle uncertainty through the use of planning approaches. In this paper, we study what type of adaptiveness is proposed and how this may be operationalized in planning approaches to adequately handle different uncertainties. We took a

  11. PARETO: A novel evolutionary optimization approach to multiobjective IMRT planning.

    Science.gov (United States)

    Fiege, Jason; McCurdy, Boyd; Potrebko, Peter; Champion, Heather; Cull, Andrew

    2011-09-01

    of beams. This initial evaluation of the evolutionary optimization software tool pareto for IMRT treatment planning demonstrates feasibility and provides motivation for continued development. Advantages of this approach over current commercial methods for treatment planning are many, including: (1) fully automated optimization that avoids human controlled iterative optimization and potentially improves overall process efficiency, (2) formulation of the problem as a true multiobjective one, which provides an optimized set of Pareto nondominated solutions refined over hundreds of generations and compiled from thousands of parameter sets explored during the run, and (3) rapid exploration of the final nondominated set accomplished by a graphical interface used to select the best treatment option for the patient.

  12. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  13. Global floor planning approach for VLSI design

    International Nuclear Information System (INIS)

    LaPotin, D.P.

    1986-01-01

    Within a hierarchical design environment, initial decisions regarding the partitioning and choice of module attributes greatly impact the quality of the resulting IC in terms of area and electrical performance. This dissertation presents a global floor-planning approach which allows designers to quickly explore layout issues during the initial stages of the IC design process. In contrast to previous efforts, which address the floor-planning problem from a strict module placement point of view, this approach considers floor-planning from an area planning point of view. The approach is based upon a combined min-cut and slicing paradigm, which ensures routability. To provide flexibility, modules may be specified as having a number of possible dimensions and orientations, and I/O pads as well as layout constraints are considered. A slicing-tree representation is employed, upon which a sequence of traversal operations are applied in order to obtain an area efficient layout. An in-place partitioning technique, which provides an improvement over previous min-cut and slicing-based efforts, is discussed. Global routing and module I/O pin assignment are provided for floor-plan evaluation purposes. A computer program, called Mason, has been developed which efficiently implements the approach and provides an interactive environment for designers to perform floor-planning. Performance of this program is illustrated via several industrial examples

  14. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  15. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  16. Theoretical orientations in environmental planning: An inquiry into alternative approaches

    Science.gov (United States)

    Briassoulis, Helen

    1989-07-01

    In the process of devising courses of action to resolve problems arising at the society-environment interface, a variety of planning approaches are followed, whose adoption is influenced by—among other things—the characteristics of environmental problems, the nature of the decision-making context, and the intellectual traditions of the disciplines contributing to the study of these problems. This article provides a systematic analysis of six alternative environmental planning approaches—comprehensive/rational, incremental, adaptive, contingency, advocacy, and participatory/consensual. The relative influence of the abovementioned factors is examined, the occurrence of these approaches in real-world situations is noted, and their environmental soundness and political realism is evaluated. Because of the disparity between plan formulation and implementation and between theoretical form and empirical reality, a synthetic view of environmental planning approaches is taken and approaches in action are identified, which characterize the totality of the planning process from problem definition to plan implementation, as well as approaches in the becoming, which may be on the horizon of environmental planning of tomorrow. The suggested future research directions include case studies to verify and detail the presence of the approaches discussed, developing measures of success of a given approach in a given decision setting, and an intertemporal analysis of environmental planning approaches.

  17. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  18. Data integration for statewide transportation planning : final report

    Science.gov (United States)

    2009-08-01

    The goal of this study was to investigate the data availability, accessibility, and interoperability issues arisen from the statewide : transportation planning activities undertaken at WisDOT and to identify possible approaches for addressing these i...

  19. Marketing planning by learning: "Plearning" approach

    Directory of Open Access Journals (Sweden)

    Ilić Milovan M.

    2006-01-01

    Full Text Available This work emphasizes that the final outcome of planning is not only the benefit of having the ready plan but showing that the very process of planning through which a business goes through, is important. Here we consider the process of learning in order to get a complete picture of current and future business processes. Three stages of learning are included. The first stage describes the current position of the business; the second stage describes the position of the business in the future and the last stage shows how the business will achieve these objectives. The focus of planning should be deciding on internal communication which form the basis for gaining the competitive advantage. One of the ways for carrying out this analysis is creating the matrix based on gaining competitive advantage through using resources.

  20. PARETO: A novel evolutionary optimization approach to multiobjective IMRT planning

    International Nuclear Information System (INIS)

    Fiege, Jason; McCurdy, Boyd; Potrebko, Peter; Champion, Heather; Cull, Andrew

    2011-01-01

    promise in optimizing the number of beams. Conclusions: This initial evaluation of the evolutionary optimization software tool pareto for IMRT treatment planning demonstrates feasibility and provides motivation for continued development. Advantages of this approach over current commercial methods for treatment planning are many, including: (1) fully automated optimization that avoids human controlled iterative optimization and potentially improves overall process efficiency, (2) formulation of the problem as a true multiobjective one, which provides an optimized set of Pareto nondominated solutions refined over hundreds of generations and compiled from thousands of parameter sets explored during the run, and (3) rapid exploration of the final nondominated set accomplished by a graphical interface used to select the best treatment option for the patient.

  1. Corridor X in Serbia: Approach to spatial planning

    Directory of Open Access Journals (Sweden)

    Milijić Saša

    2003-01-01

    Full Text Available For the infrastructural corridor's area, of the national importance, is predicted making spatial plans of area of special use, as the most complex instruments for the developing and arranging management of these areas. These plans should have an integrative and problem-oriented approach towards development planning and arrangement of such an area, and it is obliged to include: a complex evaluation of state and function of infrastructural system in the corridor; an analysis of infrastructural corridor influence on the development of the planning area and its surrounding; an alternative conception of long-term protection, improvement, organization and use of the planning area; a choice of the priorities and assumption of the realization phases; instructions for the implementation of the plan etc. The approach in making of this category of plans, as well as, experiences in planning, arrangement and use of multimodal corridors, have been considered on the example of Spatial plan of the infrastructural corridor E-75 section Belgrade-Nis area.

  2. Green Infrastructure and German Landscape Planning: A Comparison of Approaches

    Directory of Open Access Journals (Sweden)

    Catalina VIEIRA MEJÍA

    2015-11-01

    Full Text Available A variety of similarities between green infrastructure and the German landscape planning can be found in comparing the approaches of the two planning instruments. Principles of green infrastructure such as multifunctionality, the multi-scale approach and connectivity show correspondences with landscape planning elements. However, some differences are apparent. The objective of this paper is to determine whether the main aims of these two frameworks overlap. It also seeks to deduce what benefits from ecosystem services could be provided by integrating the green infrastructure approach into the German landscape planning system. The results show that the green infrastructure concept is not well-known in German planning practice, although its principles are generally implemented through traditional landscape planning. Nevertheless, green infrastructure could act as a supplementary approach to current landscape planning practices by improving public acceptance and strengthening the social focus of the current landscape planning system.

  3. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  4. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  5. An Approximation Approach for Solving the Subpath Planning Problem

    OpenAIRE

    Safilian, Masoud; Tashakkori, S. Mehdi; Eghbali, Sepehr; Safilian, Aliakbar

    2016-01-01

    The subpath planning problem is a branch of the path planning problem, which has widespread applications in automated manufacturing process as well as vehicle and robot navigation. This problem is to find the shortest path or tour subject for travelling a set of given subpaths. The current approaches for dealing with the subpath planning problem are all based on meta-heuristic approaches. It is well-known that meta-heuristic based approaches have several deficiencies. To address them, we prop...

  6. An innovative approach for planning and execution of pre-experimental runs for Design of Experiments

    Directory of Open Access Journals (Sweden)

    Muhammad Arsalan Farooq

    2016-09-01

    Full Text Available This paper addresses the study of the pre-experimental planning phase of the Design of Experiments (DoE in order to improve the final product quality. The pre-experimental planning phase includes a clear identification of the problem statement, selection of control factors and their respective levels and ranges. To improve production quality based on the DoE a new approach for the pre-experimental planning phase, called Non-Conformity Matrix (NCM, is presented. This article also addresses the key steps of the pre-experimental runs considering a consumer goods manufacturing process. Results of the application for an industrial case show that this methodology can support a clear definition of the problem and also a correct identification of the factor ranges in particular situations. The proposed new approach allows modeling the entire manufacturing system holistically and correctly defining the factor ranges and respective levels for a more effective application of DoE. This new approach can be a useful resource for both research and industrial practitioners who are dedicated to large DoE projects with unknown factor interactions, when the operational levels and ranges are not completely defined.

  7. Planning for risk-informed/performance-based fire protection at nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Najafi, B.; Parkinson, W.J.; Lee, J.A.

    1997-12-01

    This document presents a framework for discussing issues and building consensus towards use of fire modeling and risk technology in nuclear power plant fire protection program implementation. The plan describes a three-phase approach: development of core technologies, implementation of methods, and finally, case studies and pilot applications to verify viability of such methods. The core technologies are defined as fire modeling, fire and system tests, use of operational data, and system and risk techniques. The implementation phase addresses the programmatic issues involved in implementing a risk-informed/performance-based approach in an integrated approach with risk/performance measures. The programmatic elements include: (1) a relationship with fire codes and standards development as defined by the ongoing effort of NFPA for development of performance-based standards; (2) the ability for NRC to undertake inspection and enforcement; and (3) the benefit to utilities in terms of cost versus safety. The case studies are intended to demonstrate applicability of single issue resolution while pilot applications are intended to check the applicability of the integrated program as a whole

  8. Security and privacy preserving approaches in the eHealth clouds with disaster recovery plan.

    Science.gov (United States)

    Sahi, Aqeel; Lai, David; Li, Yan

    2016-11-01

    Cloud computing was introduced as an alternative storage and computing model in the health sector as well as other sectors to handle large amounts of data. Many healthcare companies have moved their electronic data to the cloud in order to reduce in-house storage, IT development and maintenance costs. However, storing the healthcare records in a third-party server may cause serious storage, security and privacy issues. Therefore, many approaches have been proposed to preserve security as well as privacy in cloud computing projects. Cryptographic-based approaches were presented as one of the best ways to ensure the security and privacy of healthcare data in the cloud. Nevertheless, the cryptographic-based approaches which are used to transfer health records safely remain vulnerable regarding security, privacy, or the lack of any disaster recovery strategy. In this paper, we review the related work on security and privacy preserving as well as disaster recovery in the eHealth cloud domain. Then we propose two approaches, the Security-Preserving approach and the Privacy-Preserving approach, and a disaster recovery plan. The Security-Preserving approach is a robust means of ensuring the security and integrity of Electronic Health Records, and the Privacy-Preserving approach is an efficient authentication approach which protects the privacy of Personal Health Records. Finally, we discuss how the integrated approaches and the disaster recovery plan can ensure the reliability and security of cloud projects. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. A Sociotechnical Systems Approach To Coastal Marine Spatial Planning

    Science.gov (United States)

    2016-12-01

    SYSTEMS APPROACH TO COASTAL MARINE SPATIAL PLANNING by Tyler B. McDonald December 2016 Thesis Advisor: Karen Holness Co-Advisor: Tom...2016 3. REPORT TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE A SOCIOTECHNICAL SYSTEMS APPROACH TO COASTAL MARINE SPATIAL PLANNING...engineering perspective and specifically used a sociotechnical systems approach . The research investigated aquaculture permitting from the

  10. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  11. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming. On December 5...

  12. Robot Learning from Demonstration: A Task-level Planning Approach

    Directory of Open Access Journals (Sweden)

    Staffan Ekvall

    2008-09-01

    Full Text Available In this paper, we deal with the problem of learning by demonstration, task level learning and planning for robotic applications that involve object manipulation. Preprogramming robots for execution of complex domestic tasks such as setting a dinner table is of little use, since the same order of subtasks may not be conceivable in the run time due to the changed state of the world. In our approach, we aim to learn the goal of the task and use a task planner to reach the goal given different initial states of the world. For some tasks, there are underlying constraints that must be fulfille, and knowing just the final goal is not sufficient. We propose two techniques for constraint identification. In the first case, the teacher can directly instruct the system about the underlying constraints. In the second case, the constraints are identified by the robot itself based on multiple observations. The constraints are then considered in the planning phase, allowing the task to be executed without violating any of them. We evaluate our work on a real robot performing pick-and-place tasks.

  13. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  14. Freshwater conservation planning: the case for systematic approaches

    CSIR Research Space (South Africa)

    Linke, S

    2011-01-01

    Full Text Available The authors review recent advances in systematic conservation planning in fresh waters. Most modern systematic planning approaches are based on the CARE principles: comprehensiveness, adequacy, representativeness and efficiency. Efficiency...

  15. Demand planning approaches employed by clothing industry stakeholders in Gauteng, South Africa

    Directory of Open Access Journals (Sweden)

    Ntombizodwa J. Matsoma

    2017-10-01

    Full Text Available Background: The decline in the productivity of the South African clothing industry was attributed to changing trends in the number of clothing production organisations, which together with a decline in manufacturing output and a fluctuation in employment had all contributed to complexities in demand planning. Purpose: This article investigates demand planning approaches in the clothing industry in Gauteng. Method: A descriptive study was conducted based on a structured questionnaire. Findings: The results revealed that both hierarchical and optimal approaches should be considered in clothing manufacturing. Managerial implications: In order to improve demand planning practices in the clothing industry, managers are recommended to apply hierarchical and optimal demand planning approaches, which might bring about improvements to demand planning in the Gauteng clothing industry. Conclusion: It is recommended that clothing manufacturers consider the types of product offering before making decisions about adopting the hierarchical or optimal demand planning approaches. When planning for basic clothes, manufacturers should consider a hierarchical demand planning approach, whereas the optimal demand planning approach is recommended for fashion clothes.

  16. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    Science.gov (United States)

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  17. Electric generating capacity planning: A nonlinear programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Yakin, M.Z.; McFarland, J.W.

    1987-02-01

    This paper presents a nonlinear programming approach for long-range generating capacity expansion planning in electrical power systems. The objective in the model is the minimization of total cost consisting of investment cost plus generation cost for a multi-year planning horizon. Reliability constraints are imposed by using standard and practical reserve margin requirements. State equations representing the dynamic aspect of the problem are included. The electricity demand (load) and plant availabilities are treated as random variables, and the method of cumulants is used to calculate the expected energy generated by each plant in each year of the planning horizon. The resulting model has a (highly) nonlinear objective function and linear constraints. The planning model is solved over the multiyear planning horizon instead of decomposing it into one-year period problems. This approach helps the utility decision maker to carry out extensive sensitivity analysis easily. A case study example is provided using EPRI test data. Relationships among the reserve margin, total cost and surplus energy generating capacity over the planning horizon are explored by analyzing the model.

  18. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  19. Intelligent Transportation and Evacuation Planning A Modeling-Based Approach

    CERN Document Server

    Naser, Arab

    2012-01-01

    Intelligent Transportation and Evacuation Planning: A Modeling-Based Approach provides a new paradigm for evacuation planning strategies and techniques. Recently, evacuation planning and modeling have increasingly attracted interest among researchers as well as government officials. This interest stems from the recent catastrophic hurricanes and weather-related events that occurred in the southeastern United States (Hurricane Katrina and Rita). The evacuation methods that were in place before and during the hurricanes did not work well and resulted in thousands of deaths. This book offers insights into the methods and techniques that allow for implementing mathematical-based, simulation-based, and integrated optimization and simulation-based engineering approaches for evacuation planning. This book also: Comprehensively discusses the application of mathematical models for evacuation and intelligent transportation modeling Covers advanced methodologies in evacuation modeling and planning Discusses principles a...

  20. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  1. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    Science.gov (United States)

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  2. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-11-18

    ...] Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan and.../docs/HI-PI/docsjcpearl.htm . Email: [email protected] . Include ``Pearl Harbor final CCP'' in...`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project Leader, (808) 637-6330...

  3. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2013-03-14

    ...-FF03R06000] Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and... the Environmental Assessment (EA) for Neal Smith National Wildlife Refuge (Refuge, NWR). In this final... . Include ``Neal Smith Final CCP'' in the subject line of the message. U.S. Mail: Neal Smith National...

  4. Reactive Path Planning Approach for Docking Robots in Unknown Environment

    Directory of Open Access Journals (Sweden)

    Peng Cui

    2017-01-01

    Full Text Available Autonomous robots need to be recharged and exchange information with the host through docking in the long-distance tasks. Therefore, feasible path is required in the docking process to guide the robot and adjust its pose. However, when there are unknown obstacles in the work area, it becomes difficult to determine the feasible path for docking. This paper presents a reactive path planning approach named Dubins-APF (DAPF to solve the path planning problem for docking in unknown environment with obstacles. In this proposed approach the Dubins curves are combined with the designed obstacle avoidance potential field to plan the feasible path. Firstly, an initial path is planned and followed according to the configurations of the robot and the docking station. Then when the followed path is evaluated to be infeasible, the intermediate configuration is calculated as well as the replanned path based on the obstacle avoidance potential field. The robot will be navigated to the docking station with proper pose eventually via the DAPF approach. The proposed DAPF approach is efficient and does not require the prior knowledge about the environment. Simulation results are given to validate the effectiveness and feasibility of the proposed approach.

  5. An innovative approach to capability-based emergency operations planning.

    Science.gov (United States)

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.

  6. Multiyear Program Plan for the High Temperature Materials Laboratory; FINAL

    International Nuclear Information System (INIS)

    Arvid E. Pasto

    2000-01-01

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO(sub x) and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required

  7. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  8. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  9. Optimization approaches to volumetric modulated arc therapy planning

    Energy Technology Data Exchange (ETDEWEB)

    Unkelbach, Jan, E-mail: junkelbach@mgh.harvard.edu; Bortfeld, Thomas; Craft, David [Department of Radiation Oncology, Massachusetts General Hospital and Harvard Medical School, Boston, Massachusetts 02114 (United States); Alber, Markus [Department of Medical Physics and Department of Radiation Oncology, Aarhus University Hospital, Aarhus C DK-8000 (Denmark); Bangert, Mark [Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Heidelberg D-69120 (Germany); Bokrantz, Rasmus [RaySearch Laboratories, Stockholm SE-111 34 (Sweden); Chen, Danny [Department of Computer Science and Engineering, University of Notre Dame, Notre Dame, Indiana 46556 (United States); Li, Ruijiang; Xing, Lei [Department of Radiation Oncology, Stanford University, Stanford, California 94305 (United States); Men, Chunhua [Department of Research, Elekta, Maryland Heights, Missouri 63043 (United States); Nill, Simeon [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG (United Kingdom); Papp, Dávid [Department of Mathematics, North Carolina State University, Raleigh, North Carolina 27695 (United States); Romeijn, Edwin [H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia 30332 (United States); Salari, Ehsan [Department of Industrial and Manufacturing Engineering, Wichita State University, Wichita, Kansas 67260 (United States)

    2015-03-15

    Volumetric modulated arc therapy (VMAT) has found widespread clinical application in recent years. A large number of treatment planning studies have evaluated the potential for VMAT for different disease sites based on the currently available commercial implementations of VMAT planning. In contrast, literature on the underlying mathematical optimization methods used in treatment planning is scarce. VMAT planning represents a challenging large scale optimization problem. In contrast to fluence map optimization in intensity-modulated radiotherapy planning for static beams, VMAT planning represents a nonconvex optimization problem. In this paper, the authors review the state-of-the-art in VMAT planning from an algorithmic perspective. Different approaches to VMAT optimization, including arc sequencing methods, extensions of direct aperture optimization, and direct optimization of leaf trajectories are reviewed. Their advantages and limitations are outlined and recommendations for improvements are discussed.

  10. Approach of ICT Application to Governance in Urban Planning

    Science.gov (United States)

    Virtudes, Ana; Sá, João

    2017-10-01

    This article discusses the use of information and communication technologies (ICT) at the local level of governance in the field of urban planning. It is based on a literature review, in order to define a set of considerations about their use in the urban context and the challenges ahead on this domain. As a starting point, there is the need of rethinking the local governance through the use of ICT related to cities, focused on the modernization of the processes associated with urban planning. Nowadays, in several societies the paradigm about cities if shifting, from an expansionist way of acting towards a regeneration and rehabilitation approach. In the case of Portugal, the local authorities; the municipalities; are the main responsible for the coordination, and integration of policies with territorial impacts. However, these policies are generally onerous and inefficient, triggering communication and information failures in between local administration and citizens. In this sense, governance should support the decision-making process related to cities’ policies, engaging citizens and socio-economic agents. As the main result in this scenario, the use of ICT demonstrates the ability to play an important role in urban planning, by contributing as a simplifying tool, regarding the information and knowledge sharing, gathering local authorities, citizens and socio-economic agents. On the one hand, they promote the reduction of inefficiencies associated to the urban planning process. On the other hand, they boost the development of networks, and consequently the social and territorial cohesion. In summary, the use of ICT infrastructures works as a glue allowing the integration of several intelligence elements of the city, and operating as their base platform. Finally, the literature has revealed that the use of ICT in urban planning should be seen as a means to a wider social goal, and not as an end by itself. With the use of ICT, urban planning authorities are more

  11. Spatiotemporal radiotherapy planning using a global optimization approach

    Science.gov (United States)

    Adibi, Ali; Salari, Ehsan

    2018-02-01

    This paper aims at quantifying the extent of potential therapeutic gain, measured using biologically effective dose (BED), that can be achieved by altering the radiation dose distribution over treatment sessions in fractionated radiotherapy. To that end, a spatiotemporally integrated planning approach is developed, where the spatial and temporal dose modulations are optimized simultaneously. The concept of equivalent uniform BED (EUBED) is used to quantify and compare the clinical quality of spatiotemporally heterogeneous dose distributions in target and critical structures. This gives rise to a large-scale non-convex treatment-plan optimization problem, which is solved using global optimization techniques. The proposed spatiotemporal planning approach is tested on two stylized cancer cases resembling two different tumor sites and sensitivity analysis is performed for radio-biological and EUBED parameters. Numerical results validate that spatiotemporal plans are capable of delivering a larger BED to the target volume without increasing the BED in critical structures compared to conventional time-invariant plans. In particular, this additional gain is attributed to the irradiation of different regions of the target volume at different treatment sessions. Additionally, the trade-off between the potential therapeutic gain and the number of distinct dose distributions is quantified, which suggests a diminishing marginal gain as the number of dose distributions increases.

  12. [Landscape planning approaches for biodiversity conservation in agriculture].

    Science.gov (United States)

    Liu, Yun-hui; Li, Liang-tao; Yu, Zhen-rong

    2008-11-01

    Biodiversity conservation in agriculture not only relates to the sustainable development of agriculture, but also is an essential part of species conservation. In recent years, the landscape planning approach for biodiversity was highlighted instead of species-focused approach. In this paper, the landscape factors affecting the biodiversity in agriculture were reviewed, and the possible landscape approaches at three different scales for more efficient conservation of biodiversity in agro-landscape were suggested, including: (1) the increase of the proportion of natural or semi-natural habitats in agriculture, diversification of land use or crop pattern, and protection or construction of corridor at landscape level; (2) the establishment of non-cropping elements such as field margin at between-field level; and (3) the application of reasonable crop density, crop distribution pattern and rotation, and intercrop etc. at within-field level. It was suggested that the relevant policies for natural conservation, land use planning, and ecological compensation should be made to apply the landscape approaches for biodiversity conservation at larger scale.

  13. 75 FR 27121 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Dependent...

    Science.gov (United States)

    2010-05-13

    ... 45 CFR Parts 144, 146, and 147 Group Health Plans and Health Insurance Issuers Relating to Dependent... 144, 146, and 147 RIN 0991-AB66 Interim Final Rules for Group Health Plans and Health Insurance... requirements for group health plans and health insurance issuers in the group and individual markets under...

  14. The role of the observational approach in RI planning: WAG 5 case study

    International Nuclear Information System (INIS)

    Brill, A.K.; Kuhaida, A.J. Jr.

    1992-10-01

    A Remedial Investigation (RI) Plan was developed for the Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 5 in March 1988 and submitted to the Environmental Protection Agency (EPA) Region IV and the State of Tennessee for review and approval. The observational approach was evaluated by the ORNL Environmental Restoration (ER) Program and accepted by EPA as an accelerated and cost-effective approach to the RI/Feasibility Study (FS) process for remediation of WAG 5. The traditional approach used in preparing the 1988 RI Plan focused on data completeness, included a typical range of RI data-gathering activities for determining the nature and extent of contamination at WAG 5, and used multiple iterations of sampling activities to deal with uncertainties without consideration of potential deviations. In fall 1991, a revised Field Sampling Plan (FSP) was developed that used the observational approach to integrate site characterization with site remediation needs. This approach recognized the uncertainties of site characterization/remedial planning and developed contingency plans for dealing with them. The observational approach emphasizes data sufficiency to support remedial planning decisions for WAG 5

  15. MRI-based treatment plan simulation and adaptation for ion radiotherapy using a classification-based approach

    International Nuclear Information System (INIS)

    Rank, Christopher M; Tremmel, Christoph; Hünemohr, Nora; Nagel, Armin M; Jäkel, Oliver; Greilich, Steffen

    2013-01-01

    In order to benefit from the highly conformal irradiation of tumors in ion radiotherapy, sophisticated treatment planning and simulation are required. The purpose of this study was to investigate the potential of MRI for ion radiotherapy treatment plan simulation and adaptation using a classification-based approach. Firstly, a voxelwise tissue classification was applied to derive pseudo CT numbers from MR images using up to 8 contrasts. Appropriate MR sequences and parameters were evaluated in cross-validation studies of three phantoms. Secondly, ion radiotherapy treatment plans were optimized using both MRI-based pseudo CT and reference CT and recalculated on reference CT. Finally, a target shift was simulated and a treatment plan adapted to the shift was optimized on a pseudo CT and compared to reference CT optimizations without plan adaptation. The derivation of pseudo CT values led to mean absolute errors in the range of 81 - 95 HU. Most significant deviations appeared at borders between air and different tissue classes and originated from partial volume effects. Simulations of ion radiotherapy treatment plans using pseudo CT for optimization revealed only small underdosages in distal regions of a target volume with deviations of the mean dose of PTV between 1.4 - 3.1% compared to reference CT optimizations. A plan adapted to the target volume shift and optimized on the pseudo CT exhibited a comparable target dose coverage as a non-adapted plan optimized on a reference CT. We were able to show that a MRI-based derivation of pseudo CT values using a purely statistical classification approach is feasible although no physical relationship exists. Large errors appeared at compact bone classes and came from an imperfect distinction of bones and other tissue types in MRI. In simulations of treatment plans, it was demonstrated that these deviations are comparable to uncertainties of a target volume shift of 2 mm in two directions indicating that especially

  16. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  17. The third stage of hospital long-range planning: the marketing approach.

    Science.gov (United States)

    Rynne, T J

    1980-01-01

    Today most hospital administrators are convinced they should implement long-range planning. The marketing approach to long-range planning is an effective strategy that is consumer oriented. It starts the planning process with the consumer, letting the consumer's needs and wants guide the organization's planning.

  18. 77 FR 51044 - Laguna Cartagena National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding...

    Science.gov (United States)

    2012-08-23

    ... download the document from our Internet Site: http://southeast.fws.gov/planning/ under ``Final Documents... facilities and programs will be expanded. Specifically, improving parking areas, providing additional...

  19. Improving resource capacity planning in hospitals with business approaches.

    NARCIS (Netherlands)

    van Lent, Wineke Agnes Marieke; van Lent, W.A.M.

    2011-01-01

    This dissertation contributed to the knowledge on the translation of approaches from businesses and services to improve the resource capacity planning on tactical and operational level in (oncologic) hospital care. The following studies were presented: * Chapter 2 surveyed the business approaches

  20. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Science.gov (United States)

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide... reviews to amendments to licenses for operating reactors or for activities associated with review of...

  1. Adapt or Perish: A Review of Planning Approaches for Adaptation under Deep Uncertainty

    Directory of Open Access Journals (Sweden)

    Jan H. Kwakkel

    2013-03-01

    Full Text Available There is increasing interest in long-term plans that can adapt to changing situations under conditions of deep uncertainty. We argue that a sustainable plan should not only achieve economic, environmental, and social objectives, but should be robust and able to be adapted over time to (unforeseen future conditions. Large numbers of papers dealing with robustness and adaptive plans have begun to appear, but the literature is fragmented. The papers appear in disparate journals, and deal with a wide variety of policy domains. This paper (1 describes and compares a family of related conceptual approaches to designing a sustainable plan, and (2 describes several computational tools supporting these approaches. The conceptual approaches all have their roots in an approach to long-term planning called Assumption-Based Planning. Guiding principles for the design of a sustainable adaptive plan are: explore a wide variety of relevant uncertainties, connect short-term targets to long-term goals over time, commit to short-term actions while keeping options open, and continuously monitor the world and take actions if necessary. A key computational tool across the conceptual approaches is a fast, simple (policy analysis model that is used to make large numbers of runs, in order to explore the full range of uncertainties and to identify situations in which the plan would fail.

  2. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  3. Forest management planning for timber production: a sequential approach

    Science.gov (United States)

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  4. A Modelling Approach for Integrated Planning of Port Capacity- Trade-Offs in Rotterdam Investment Planning

    Directory of Open Access Journals (Sweden)

    Sander Dekker

    2006-03-01

    Full Text Available This paper presents a modelling approach for planning ofport capacity. The approach integrates port commercial andpublic interests. It further incorporates route competition andautonomous demand growth. It is applied to port expansion,which can be considered as a strategy for an individual port todeal with route competition. The basis for solving this planningproblem comprises an analysis of port demand and supply in apartial equilibrium model. With such an approach, the reactionof a single port on the change in a transport network comprisingalternative routes to a hinterland destination can be simulated.To establish the optimal expansion strategy, port expansion iscombined with congestion pricing. This is used for the simultaneousdetermination of 1 optimal expansion size, and 2 investmentrecovery period. The modelling approach will be appliedto Rotterdam port focusing on port expansion by means ofland reclamation. The scenmio of the entry of a new competingroute via the Italian port Gioia Tauro is used to address sometrade-offs in Rotterdam investment planning.

  5. Planning and management for health in periods of economic stringency and instability: a contingency approach.

    Science.gov (United States)

    van der Werff, A

    1986-01-01

    The mid-1970s marked the end of the longest period of uninterrupted economic growth in history, and initiated in Europe--and other parts of the world--a period of economic stagnation and instability. Along with the prosperity explosion of the past, the pattern of health problems has changed and is still changing. Moreover, the demand for health care has kept on rising, without much improvement of health status in general. Thus, there is a critical need to rethink policies, and to ensure that future changes occur within the limits of shrinking resources and the allotted time-span. In particular, the change in priorities envisaged by the Health for All 2000 (HFA 2000) strategies will need to take place against the background of an ageing population, social instability, and continuing development of new lifestyles and persistent economic scarcity. It is by analysing that background that this article seeks to make recommendations as to how health planning and management might successfully cope with the policy reorientation of the HFA 2000 strategy. The structure of this article is as follows. Firstly, the changes taking place in planning conditions will be reviewed, and form the basis of a framework for subsequent analysis of the planning environment. Following this framework, some of the conflicts likely to be faced in planning and management will be discussed, many of which are the consequence of economic stringency and instability. Also the requirements for an improvement of the effectiveness and efficiency of planning will be identified. Finally, a limited number of approaches to planning will be considered, for their appropriateness to the present-day economic circumstances. The point of view elucidated throughout is that there is no single solution which is 'best' under all circumstances. The conclusion, rather, is that the selection of particular theory or method of planning and management should depend both on the objectives of the decision maker and on the

  6. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Science.gov (United States)

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... and Insurance Oversight, Department of Health and Human Services. ACTION: Interim final rules with...

  7. Planning a World Wide Web based design computer system supporting a collaborative design process

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    1996-01-01

    An early planning of a WWW-based CAD-system is the major of this publication. Different approaches are discussed and the final "solution" for the system is described in a general way.......An early planning of a WWW-based CAD-system is the major of this publication. Different approaches are discussed and the final "solution" for the system is described in a general way....

  8. Planning approaches for rurban areas

    DEFF Research Database (Denmark)

    Busck, Anne Gravsholt; Hidding, Marjan; Kristensen, Søren Bech Pilgaard

    2009-01-01

    ), Staffanstorp municipality (Sweden) and Werv-area (the Netherlands). All three areas belong to the rurban zone and are selected to exemplify pro-active planning. The analysis focuses on how the concept of compact city is perceived and implemented, how rurban areas are managed in order to avoid further urban...... encroachment, and how resilient green landscapes are ensured. The results reveal significant differences in approaches, reflecting variations in the public involvement in rurban areas development, the role of different administrative levels and the use of zonation. Variation in the use of zonation encapsulates...

  9. Research approach for forming a new typology of spatial planning theory

    Directory of Open Access Journals (Sweden)

    Bulajić Vladan

    2011-01-01

    Full Text Available What is being suggested in this paper is the research approach for the classification of theoretical contributions in the scientific domain of the spatial planning. Typology is a multidimensional classification, actually it is the framework for the understanding of the subject area, theory and practice, ideas and methodologies. The complex approach is needed to organize the complex and diverse domain of spatial planning theory, which has been shaped by different schools of thought and the influences of the related scientific disciplines. It has been suggested that the research approach becomes the bridge between two cultures, in other words it should be the synthesis of the qualitative and quantitative methods of the typology construction. With the analysis of the existing typologies, which are quantitatively derived, the chosen concepts will be improved and completed due to the computerized statistical analysis of the appropriate bibliometrical data. Moreover, the procedure in the opposite direction will be used, which also connects empiric types with their conceptual counterparts. With that approach, the main aim is to achieve the comprehensive classification scheme, which will take part of the platform for integration of the interdisciplinary approach in the spatial planning domain. That concept of the research belongs to the wider approach that has got the aim that with the scientific innovations and imaginations bring about the solving of the problems and challenges that the spatial planning faces with. The forming of the new typology is the first step in that direction.

  10. Nuclear power programme planning: An integrated approach

    International Nuclear Information System (INIS)

    2001-12-01

    The International Atomic Energy Agency (IAEA) has published material on different policy considerations in the introduction of nuclear power, primarily addressed to top level decision makers in government and industry in Member States. Several Member States and experts recommended to the IAEA to address the aspects of an integrated approach to nuclear power programme planning and to serve as guidance to those countries wishing to embark on a nuclear power programme. As a follow-up, the present publication is primarily intended to serve as guidance for executives and managers in Member States in planning for possible introduction of nuclear power plants in their electricity generating systems. Nuclear power programme planning, as dealt with in this publication, includes all activities that need to be carried out up to a well-founded decision to proceed with a project feasibility study. Project implementation beyond this decision is not in the scope of this publication. Although it is possible to use nuclear energy as a heat source for industrial processes, desalination and other heat applications, it is assumed in this publication that the planning is aimed towards nuclear power for electricity generation. Much of the information given would, however, also be relevant for planning of nuclear reactors for heat production. The publication was prepared within the framework of the IAEA programme on nuclear power planning, implementation and performance as a joint activity of the Nuclear Power Engineering Section and the Planning and Economic Studies Section (Division of Nuclear Power)

  11. An LNS Approach for Container Stowage Multi-port Master Planning

    DEFF Research Database (Denmark)

    Pacino, Dario

    2013-01-01

    The generation of competitive stowage plans have become a priority for the shipping industry. Stowage planning is NP-hard and is a challenging optimization problem in practice. Two-phase decomposition approaches have proved to give viable solutions. We propose a large neighborhood search (LNS) to...

  12. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Science.gov (United States)

    2013-05-03

    ... to improve the learning environment and quality of life at the POM installation. The Final EIS... are also planned to Leadership in Energy and Environmental Design standards to conserve resources. The... the Chamberlain Library on the OMC. An electronic version of the Final EIS can be viewed or downloaded...

  13. Developing a planning tool for South African prosecution resources: challenges and approach

    Directory of Open Access Journals (Sweden)

    R Koen

    2012-12-01

    Full Text Available In every country the prosecution of criminal cases is governed by different laws, policies and processes. In South Africa, the National Prosecuting Authority (NPA has the responsibility of planning and managing all prosecution functions. The NPA has certain unique characteristics that make it different from other similar organisations internationally. The development of a planning tool that the NPA could use to plan their future resource requirements over the short to medium term required extensive modelling, and its final form included features which, to the best knowledge of the development team, make it unique both locally and internationally. Model design was largely influenced by the challenges emanating from the special requirements and context of the problem. Resources were not forecasted directly, but were derived with the help of simulation models that traced docket flows through various resource-driven processes. Docket flows were derived as a proportion of reported crimes, and these were forecasted using a multivariate statistical model which could take into account explanatory variables as well as the correlations between the patterns observed within different crime categories. The simulation consisted of a number of smaller models which could be run independently, and not of one overarching model. This approach was found to make the best use of available data, and compensated for the fact that certain parameters, linking different courts and court types, were not available. In addition, it simplified scenario testing and sensitivity analysis. The various components of the planning tool, including inputs and outputs of the simulation models and the linkages between the forecasts and the simulation models, were implemented in a set of spreadsheets. By using spreadsheets as a common user interface, the planning tool could be used by prosecutors and managers who may not have extensive mathematical or modelling experience.

  14. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...

  15. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  16. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  17. The UK national response plan: An 'all-risk' approach

    International Nuclear Information System (INIS)

    Englefield, C.

    2001-01-01

    Full text: The UK has been using and regulating radioactive materials for many years. The law, and the regulatory systems to implement it have developed over time, to meet the perceived need. More recently, the threat of inadvertent movements of, and illicit trafficking in radioactive materials has become apparent. This relatively new challenge cannot be met by a single U.K. law enforcement body. There will be Police and security services interest in any cases that arise of deliberate trafficking in fissile materials, and there will be statutory concerns for Customs and Excise. At the operational level, they do not have radioanalytical services and radiation protection support immediately available, as the frequency of occurrence of such incidents is extremely low. However, the typical case is an inadvertent movement. These usually involve orphaned sources, where none of the above law enforcement bodies have a statutory locus. In such cases, it is the UK environment agencies that take the lead (as regulators of radioactive substances), together with Health and Safety Executive as regulators of radiation safety. However they do not have all the statutory powers needed to intervene. This is in contrast to the position in some other countries. The UK paper at the International Conference of Regulators in Buenos Aires in December 2000 described the UK's co-ordination work to create synergies between law enforcement bodies and potentially affected industry groups. This was described as an 'All Risk Approach'. This is seen as the best way to manage an effective response to the challenge, given that the legislation cannot at present provide all the necessary powers. This new paper will describe the UK Response Plan and how it is designed to cover all risk: radiological and socio-economic. It will also describe how the Plan is being tested and validated as a project. The plan draws on UK Emergency Planning policy, as well as IAEA guidance on the Prevention, Detection and

  18. Mid-Term Assessment of the EU Drugs Strategy 2013-2020 and Final Evaluation of the Action Plan on Drugs 2013-2016: Final report.

    Science.gov (United States)

    Emilie, Balbirnie; Matthew, Davies; Emma, Disley; Cristina Gonzalez, Monsalve; Stephen, Hartka; Stijn, Hoorens; Kristy, Kruithof; Martin, Sacher; Jirka, Taylor

    2018-01-01

    The aim of the EU Drugs Strategy 2013-2020 is to contribute to a reduction in drug demand and drug supply within the EU. The Strategy has so far been implemented by an Action Plan covering the period 2013-2016. This article sets out the findings of an evaluation that assesses the degree of implementation of the Strategy and the Action Plan in terms of outputs and, where possible, impacts. It looks at the extent to which the objectives of the Strategy have been achieved. The evaluation aims to provide evidence to support the European Commission's decision about whether to propose a new Action Plan for the period 2017-2020 and, if so, what changes would be needed compared to the current plan. Through applying a mixed-methods approach, the evaluation examined the effectiveness, efficiency, relevance and coherence of the actions undertaken on the basis of the EU Drugs Strategy and the Action Plan, as well as their EU added value. The evaluation makes 20 recommendations, addressed to the European Commission, Member States, the European Council and other stakeholders. The key recommendation for the Commission is that a new Action Plan should be implemented for the period 2017-2020. This should be an updated version of the current Action Plan, rather than taking a new approach or introducing more new actions.

  19. SU-G-BRC-02: A Novel Multi-Criteria Optimization Approach to Generate Deliverable Intensity-Modulated Radiation Therapy (IMRT) Treatment Plans

    Energy Technology Data Exchange (ETDEWEB)

    Kirlik, G; D’Souza, W; Zhang, H [University of Maryland School of Medicine, Baltimore, MD (United States)

    2016-06-15

    Purpose: To present a novel multi-criteria optimization (MCO) solution approach that generates treatment plans with deliverable apertures using column generation. Methods: We demonstrate our method with 10 locally advanced head-and-neck cancer cases retrospectively. In our MCO formulation, we defined an objective function for each structure in the treatment volume. This resulted in 9 objective functions, including 3 distinct objectives for primary target volume, high-risk and low-risk target volumes, 5 objectives for each of the organs-at-risk (OARs) (two parotid glands, spinal cord, brain stem and oral cavity), and one for the non-target non-OAR normal tissue. Conditional value-at-risk (CVaR) constraints were utilized to ensure at least certain fraction of the target volumes receiving the prescription doses. To directly generate deliverable plans, column generation algorithm was embedded within our MCO approach for aperture shape generation. Final dose distributions for all plans were generated using a Monte Carlo kernel-superposition dose calculation. We compared the MCO plans with the clinical plans, which were created by clinicians. Results: At least 95% target coverage was achieved by both MCO plans and clinical plans. However, the average conformity indices of clinical plans and the MCO plans were 1.95 and 1.35, respectively (31% reduction, p<0.01). Compared to the conventional clinical plan, the proposed MCO method achieved average reductions in left parotid mean dose of 5% (p=0.06), right parotid mean dose of 18% (p<0.01), oral cavity mean dose of 21% (p=0.03), spinal cord maximum dose of 20% (p<0.01), brain stem maximum dose of 61% (p<0.01), and normal tissue maximum dose of 5% (p<0.01), respectively. Conclusion: We demonstrated that the proposed MCO method was able to obtain deliverable IMRT treatment plans while achieving significant improvements in dosimetric plan quality.

  20. A New Path-Constrained Rendezvous Planning Approach for Large-Scale Event-Driven Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Ahmadreza Vajdi

    2018-05-01

    Full Text Available We study the problem of employing a mobile-sink into a large-scale Event-Driven Wireless Sensor Networks (EWSNs for the purpose of data harvesting from sensor-nodes. Generally, this employment improves the main weakness of WSNs that is about energy-consumption in battery-driven sensor-nodes. The main motivation of our work is to address challenges which are related to a network’s topology by adopting a mobile-sink that moves in a predefined trajectory in the environment. Since, in this fashion, it is not possible to gather data from sensor-nodes individually, we adopt the approach of defining some of the sensor-nodes as Rendezvous Points (RPs in the network. We argue that RP-planning in this case is a tradeoff between minimizing the number of RPs while decreasing the number of hops for a sensor-node that needs data transformation to the related RP which leads to minimizing average energy consumption in the network. We address the problem by formulating the challenges and expectations as a Mixed Integer Linear Programming (MILP. Henceforth, by proving the NP-hardness of the problem, we propose three effective and distributed heuristics for RP-planning, identifying sojourn locations, and constructing routing trees. Finally, experimental results prove the effectiveness of our approach.

  1. A New Path-Constrained Rendezvous Planning Approach for Large-Scale Event-Driven Wireless Sensor Networks.

    Science.gov (United States)

    Vajdi, Ahmadreza; Zhang, Gongxuan; Zhou, Junlong; Wei, Tongquan; Wang, Yongli; Wang, Tianshu

    2018-05-04

    We study the problem of employing a mobile-sink into a large-scale Event-Driven Wireless Sensor Networks (EWSNs) for the purpose of data harvesting from sensor-nodes. Generally, this employment improves the main weakness of WSNs that is about energy-consumption in battery-driven sensor-nodes. The main motivation of our work is to address challenges which are related to a network’s topology by adopting a mobile-sink that moves in a predefined trajectory in the environment. Since, in this fashion, it is not possible to gather data from sensor-nodes individually, we adopt the approach of defining some of the sensor-nodes as Rendezvous Points (RPs) in the network. We argue that RP-planning in this case is a tradeoff between minimizing the number of RPs while decreasing the number of hops for a sensor-node that needs data transformation to the related RP which leads to minimizing average energy consumption in the network. We address the problem by formulating the challenges and expectations as a Mixed Integer Linear Programming (MILP). Henceforth, by proving the NP-hardness of the problem, we propose three effective and distributed heuristics for RP-planning, identifying sojourn locations, and constructing routing trees. Finally, experimental results prove the effectiveness of our approach.

  2. A New Path-Constrained Rendezvous Planning Approach for Large-Scale Event-Driven Wireless Sensor Networks

    Science.gov (United States)

    Zhang, Gongxuan; Wang, Yongli; Wang, Tianshu

    2018-01-01

    We study the problem of employing a mobile-sink into a large-scale Event-Driven Wireless Sensor Networks (EWSNs) for the purpose of data harvesting from sensor-nodes. Generally, this employment improves the main weakness of WSNs that is about energy-consumption in battery-driven sensor-nodes. The main motivation of our work is to address challenges which are related to a network’s topology by adopting a mobile-sink that moves in a predefined trajectory in the environment. Since, in this fashion, it is not possible to gather data from sensor-nodes individually, we adopt the approach of defining some of the sensor-nodes as Rendezvous Points (RPs) in the network. We argue that RP-planning in this case is a tradeoff between minimizing the number of RPs while decreasing the number of hops for a sensor-node that needs data transformation to the related RP which leads to minimizing average energy consumption in the network. We address the problem by formulating the challenges and expectations as a Mixed Integer Linear Programming (MILP). Henceforth, by proving the NP-hardness of the problem, we propose three effective and distributed heuristics for RP-planning, identifying sojourn locations, and constructing routing trees. Finally, experimental results prove the effectiveness of our approach. PMID:29734718

  3. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  4. Heuristic hybrid game approach for fleet condition-based maintenance planning

    International Nuclear Information System (INIS)

    Feng, Qiang; Bi, Xiong; Zhao, Xiujie; Chen, Yiran; Sun, Bo

    2017-01-01

    The condition-based maintenance (CBM) method is commonly used to select appropriate maintenance opportunities according to equipment status over a period of time. The CBM of aircraft fleets is a fleet maintenance planning problem. In this problem, mission requirements, resource constraints, and aircraft statuses are considered to find an optimal strategy set. Given that the maintenance strategies for each aircraft are finite, fleet CBM can be treated as a combinatorial optimization problem. In this study, the process of making a decision on the CBM of military fleets is analyzed. The fleet CBM problem is treated as a two-stage dynamic decision-making problem. Aircraft are divided into dispatch and standby sets; thus, the problem scale is significantly reduced. A heuristic hybrid game (HHG) approach comprising a competition game and a cooperative game is proposed on the basis of heuristic rule. In the dispatch set, a competition game approach is proposed to search for a local optimal strategy matrix. A cooperative game method for the two sets is also proposed to ensure global optimization. Finally, a case study regarding a fleet comprising 20 aircraft is conducted, with the results proving that the approach efficiently generates outcomes that meet the mission risk-oriented schedule requirement. - Highlights: • A new heuristic hybrid game method for fleet condition-based maintenance is proposed. • The problem is simplified by hierarchical solving based on dispatch and standby set. • The local optimal solution is got by competition game algorithm for dispatch set. • The global optimal solution is got by cooperative game algorithm between two sets.

  5. Language Management Theory as One Approach in Language Policy and Planning

    Science.gov (United States)

    Nekvapil, Jirí

    2016-01-01

    Language Policy and Planning is currently a significantly diversified research area and thus it is not easy to find common denominators that help to define basic approaches within it. Richard B. Baldauf attempted to do so by differentiating between four basic approaches: (1) the classical approach, (2) the language management approach (Language…

  6. Curriculum Planning and the Concept of Participation in the Reggio Emilia Pedagogical Approach

    Science.gov (United States)

    Hocevar, Andreja; Šebart, Mojca Kovac; Štefanc, Damijan

    2013-01-01

    The article analyses two defining assumptions about the Reggio Emilia (RE) approach: the absence of a planned curriculum designed in advance as a basis for educational work and children's participation in preschools. The authors demonstrate that different approaches to planning preschool education have advantages and disadvantages, which we cannot…

  7. Environmental costs and resource planning consequences: New England electric's rating and weighting approach

    International Nuclear Information System (INIS)

    Destribats, A.F.; Hutchinson, M.A.; Stout, T.M.; White, D.S.

    1990-01-01

    In mid 1989, the New England Electric System (NEES or Company) began an effort to reflect the potential environmental externalities of new resources in its long range planning process. Having examined several methods for incorporating externalities, including cost of control, the Company adopted a rating and weighting approach. Not strictly quantitative nor qualitative, the rating and weighting approach provided a means to apply an environmental score to all new resources considered for the Company's long range resource plan, NEESPLAN 1990. A maximum environmental cost penalty of fifteen percent was applied to the resource considered for inclusion in the plan that posed the highest amount of potential environmental degradation. All other resources received a smaller penalty that was based on the ratio of their environmental score to the highest score. Application of this penalty tended to improve the cost-effectiveness of demand-side programs and worsen some supply-side options' cost-effectiveness. Both the rating and weighting approach employed by NEES and its application in the long range planning process have been the subject of several critical reviews. Having stated that the advantages of the rating and weighting approach include its easy reviewability and flexibility to be modified as better information becomes available, the Company has subsequently revised the approach to address the comments made by reviewers. The purpose of this paper is to describe the rating and weighting approach, its recent revisions, and the effect of the revised methodology on the Company's long range resource plan

  8. The advanced neutron source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements [which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies] into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs

  9. The Advanced Neutron Source safety approach and plans

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1990-01-01

    The Advanced Neutron Source (ANS) is a user facility proposed for construction at the Oak Ridge National Laboratory for all areas of neutron research. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences

  10. Individualized Surgical Approach Planning for Petroclival Tumors Using a 3D Printer.

    Science.gov (United States)

    Muelleman, Thomas John; Peterson, Jeremy; Chowdhury, Naweed Iffat; Gorup, Jason; Camarata, Paul; Lin, James

    2016-06-01

    Objectives To determine the utility of three-dimensional (3D) printed models in individualized petroclival tumor resection planning by measuring the fidelity of printed anatomical structures and comparing tumor exposure afforded by different approaches. Design Case series and review of the literature. Setting Tertiary care center. Participants Three patients with petroclival lesions. Main Outcome Measures Subjective opinion of access by neuro-otologists and neurosurgeons as well as surface area of tumor exposure. Results Surgeons found the 3D models of each patient's skull and tumor useful for preoperative planning. Limitations of individual surgical approaches not identified through preoperative imaging were apparent after 3D models were evaluated. Significant variability in exposure was noted between models for similar or identical approaches. A notable drawback is that our printing process did not replicate mastoid air cells. Conclusions We found that 3D modeling is useful for individualized preoperative planning for approaching petroclival tumors. Our printing techniques did produce authentic replicas of the tumors in relation to bony structures.

  11. Changing Perspectives on the Planning of Ankara (1924-2007 and Lessons for a New Master-Planning Approach to Developing Cities

    Directory of Open Access Journals (Sweden)

    Olgu Çalişkan

    2014-07-01

    Full Text Available As one of the newly planned capitals in the 20th century – like Islamabad, Canberra and Brazil –, Ankara represents an original case in planning history: from shaping a new town under the influence of early European urbanism to the control of a dynamic metropolitan form by structural planning approaches. Forming its urban core according to the initial planning perspectives between the beginning of 1930s and the mid-1970s, the city has entered a rapid phase of space production in its extensions for about the last thirty years.In the current period of development, highly fragmented urban peripheral formation has being occurred in Ankara. Since the existing trend on the dispersion of urban form lacking spatial coherence at different scale-levels causes the dominance of the private domain and a loss of urbanity, this trend might at first glance be considered as a break with the European tradition and the emergence of Anglo-Americanization in Turkish planning system in terms of looser development control approach on urban form.Before, coming to such a critical end-point, the paper prefers a closer look into the changing dynamics of master plans of the city. It is aimed to reveal the developmental logic of the city by means of master plan analysis. The comprehensive outlook – called plan matrix – is integrated into each master plan schema by correlating the basic components like main policy directions, depth of control, settlement typology, and city structure and form. Such a framework has a potential to be utilized for any kind of plan analysis at metropolitan scale for different cases. At the end of the analysis, the paper tends to address an alternative master planning approach for the similar types of developing cities striving for keeping its urban character within a fragmented urban body.

  12. A complex systems approach to planning, optimization and decision making for energy networks

    International Nuclear Information System (INIS)

    Beck, Jessica; Kempener, Ruud; Cohen, Brett; Petrie, Jim

    2008-01-01

    This paper explores a new approach to planning and optimization of energy networks, using a mix of global optimization and agent-based modeling tools. This approach takes account of techno-economic, environmental and social criteria, and engages explicitly with inherent network complexity in terms of the autonomous decision-making capability of individual agents within the network, who may choose not to act as economic rationalists. This is an important consideration from the standpoint of meeting sustainable development goals. The approach attempts to set targets for energy planning, by determining preferred network development pathways through multi-objective optimization. The viability of such plans is then explored through agent-based models. The combined approach is demonstrated for a case study of regional electricity generation in South Africa, with biomass as feedstock

  13. A systematic approach to the planning, implementation, monitoring, and evaluation of integrated health services.

    Science.gov (United States)

    Reynolds, Heidi W; Sutherland, Elizabeth G

    2013-05-06

    Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to

  14. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  15. Developing a mental health care plan in a low resource setting: the theory of change approach.

    Science.gov (United States)

    Hailemariam, Maji; Fekadu, Abebaw; Selamu, Medhin; Alem, Atalay; Medhin, Girmay; Giorgis, Tedla Wolde; DeSilva, Mary; Breuer, Erica

    2015-09-28

    Scaling up mental healthcare through integration into primary care remains the main strategy to address the extensive unmet mental health need in low-income countries. For integrated care to achieve its goal, a clear understanding of the organisational processes that can promote and hinder the integration and delivery of mental health care is essential. Theory of Change (ToC), a method employed in the planning, implementation and evaluation of complex community initiatives, is an innovative approach that has the potential to assist in the development of a comprehensive mental health care plan (MHCP), which can inform the delivery of integrated care. We used the ToC approach to develop a MHCP in a rural district in Ethiopia. The work was part of a cross-country study, the Programme for Improving Mental Health Care (PRIME) which focuses on developing evidence on the integration of mental health in to primary care. An iterative ToC development process was undertaken involving multiple workshops with stakeholders from diverse backgrounds that included representatives from the community, faith and traditional healers, community associations, non-governmental organisations, Zonal, Regional and Federal level government offices, higher education institutions, social work and mental health specialists (psychiatrists and psychiatric nurses). The objective of this study is to report the process of implementing the ToC approach in developing mental health care plan. A total of 46 persons participated in four ToC workshops. Four critical path dimensions were identified: community, health facility, administrative and higher level care organisation. The ToC participants were actively engaged in the process and the ToC encouraged strong commitment among participants. Key opportunities and barriers to implementation and how to overcome these were suggested. During the workshops, a map incorporating the key agreed outcomes and outcome indicators was developed and finalized later

  16. A planning of exploitation to electric systems approach considering environmental criteria Description of a multicriteria optimization paradigm

    International Nuclear Information System (INIS)

    Schweickardt, Gustavo Alejandro; Gimenez Alvarez, Juan Manuel

    2012-01-01

    This work presents a context and a Model to approach the Planning of Exploitation of Electric Systems problem, in the medium term, considering environmental criteria. A decision making process from a Multicriteria Paradigm is introduced. In the past, environmental criteria just were considered or they were ignored. Due to the growing consciousness about environmental impacts of productive processes, a new orientation to the problem is required: a bigger integral quality of the planning process, instead of searching an optimal solution, based in a minimum investment cost. The Application Model considers the Total Cost of Energy Production and the Environmental Impact produced by emissions of CO 2 , SO 2 y NO x from Thermal Units, and is based in a Fuzzy Sets decision-making to represent the uncertainties in the system decision variables and satisfaction degree of solutions. The results obtained from the Traditional and Multicriteria Model, are finally presented.

  17. Environmental emergency response plans (EERPs): A single plan approach to satisfy multiple regulations

    International Nuclear Information System (INIS)

    Muzyka, L.

    1995-01-01

    Conrail is a freight railroad operating in twelve northeast and midwestern states transporting goods and materials over 11,700 miles of railroad. To repair, maintain, rebuild, and manufacture locomotives and rail cars, and to maintain the track, right of way, bridges, tunnels and other structures, Conrail uses petroleum products, solvents and cleaners. These products are stored in hundreds of storage tanks in and around the yards and right of way. To power the trains, locomotives are fueled with diesel fuel. With large volumes of fuel, lubricants, solvents and cleaners, safe and efficient handling of petroleum and chemicals is crucial to avoid negative impacts on the environment. Conrail recently revisited the issue of environmental emergency response planning. In an attempt to assure full compliance with a myriad of federal, state, and local regulation, a ''single plan approach'' was chosen. Single plans for each facility, coined EERPs, were decided on after careful review of the regulations, and evaluation of the company's operational and organizational needs

  18. The 2016-2018 National Plan of Management of Radioactive Materials and Wastes. Final report

    International Nuclear Information System (INIS)

    2017-01-01

    A first document contains the final version of the French National Plan of Management of Radioactive Materials and Wastes (PNGMDR) for the period 2016-2018: principles and objectives (presentation of radioactive materials and wastes, principles to be taken into account to define pathways of management of radioactive wastes, legal and institutional framework, information transparency), the management of radioactive materials (context and challenges, management pathways, works on fast breeder reactors of fourth generation), assessment and perspectives of existing pathways of management of radioactive wastes (management of historical situations, management of residues of mining and sterile processing, management of waste with a high natural radioactivity, management of very short life waste, of very low activity wastes, and low and medium activity wastes), needs and perspectives regarding management processes to be implemented for the different types of radioactive wastes. Appendices to this document contain: a recall of the content of previous PNGMDR since 2007, a synthesis of realisations and researches performed abroad, research orientations for the concerned period, and international agreement on spent fuel and radioactive waste management. A second document, released by the ASN, proposes an environmental and strategic assessment of the plan. A third one and a fourth one contain the opinion of the Environmental Authority on the plan preliminary focus and the answer to the Environmental Authority by the ASN. Finally, a synthesis of the remarks made by the public about the PNGMDR and the answers to these remarks conclude the document

  19. SKB`s planning of the EIA in connection with the final disposal of nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Thegerstroem, C.; Forsstroem, H. [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    1995-12-01

    The plans for the final disposal of Swedish nuclear waste are summarized. The legal requirements on Environmental Impact Statements (EIS) and their role in the program for the final disposal of nuclear waste are described. SKB`s view of the purpose of the Environmental Impact Assessment is described in the light of the experience which now exists from the work on an encapsulation facility and a deep repository. In order to obtain an adequate basis for decision-making, the EIS is of central importance. In SKB`s view, with regard to the final disposal of nuclear waste in Sweden, there is a very good possibility of fulfilling the requirements on the EIS which should be made within modern environmental protection work. 8 refs, 5 figs.

  20. Phase-based Planning for Railway Infrastructure Projects

    DEFF Research Database (Denmark)

    Li, Rui

    2017-01-01

    is important in terms of economy and rail operations. This study presents two types of Phase-based Decision Support System (PDSS), i.e. Functional Phase-Based Planning Approach (F-PBPA) and Process-Oriented Phase-Based Planning Approach (PO-PBPA). They are used for decision support for the planning...... of the railway infrastructure maintenance activities at the strategic planning level. The objective is to achieve better economy, as well as improve cost efficiency. F-PBPA consists of ve main phases: Data Collection, Technical Optimization (TeO), Economic Optimization (EcO), Constrained Optimization (Co...... the costs. Finally, constrained optimization (CoO) includes additional constraints and it allows the railway expert to adjust input parameters, thereby to obtain alternative maintenance plans. PO-PBPA contains another systematic phase based process. With a focus on Life Cycle Cost (LCC), PO-PBPA can guide...

  1. Improving environmental performance through mine closure planning

    International Nuclear Information System (INIS)

    McKee, W.; McKenna, G.

    1998-01-01

    Syncrude has been investigating landscape redevelopment concepts since 1995 after a two-year tailings technology selection study resulted in a major shift in their long-term tailings disposal strategy. The change from fluid disposal to solid disposal of tailings leads to a different landscape, incorporating a new water material type, new landforms and a new schedule of reclamation activity. A multidisciplinary approach was needed to assess, design and develop the final landscape. Planning approach in progress at Syncrude Canada was described, and the basic concepts and tools of closure planning discovered to date were outlined. The economic impacts of closure planning on mining and tailings operations in general, were discussed. 14 refs

  2. IT strategic planning in hospitals: from theory to practice.

    Science.gov (United States)

    Jaana, Mirou; Teitelbaum, Mari; Roffey, Tyson

    2014-07-01

    To date, IT strategic planning has been mostly theory-based with limited information on "best practices" in this area. This study presents the process and outcomes of IT strategic planning undertaken at a pediatric hospital (PH) in Canada. A five-stage sequential and incremental process was adopted. Various tools / approaches were used including review of existing documentation, internal survey (n = 111), fifteen interviews, and twelve workshops. IT strategic planning was informed by 230 individuals (12 percent of hospital community) and revealed consistency in the themes and concerns raised by participants (e.g., slow IT projects delivery rate, lack of understanding of IT priorities, strained communication with IT staff). Mobile and remote access to patients' information, and an integrated EMR were identified as top priorities. The methodology and used approach revealed effective, improved internal relationships, and ensured commitment to the final IT strategic plan. Several lessons were learned including: maintaining a dynamic approach capable of adapting to the fast technology evolution; involving stakeholders and ensuring continuous communication; using effective research tools to support strategic planning; and grounding the process and final product in existing models. This study contributes to the development of "best practices" in IT strategic planning, and illustrates "how" to apply the theoretical principles in this area. This is especially important as IT leaders are encouraged to integrate evidence-based management into their decision making and practices. The methodology and lessons learned may inform practitioners in other hospitals planning to engage in IT strategic planning in the future.

  3. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  4. Phase Transitions in Planning Problems: Design and Analysis of Parameterized Families of Hard Planning Problems

    Science.gov (United States)

    Hen, Itay; Rieffel, Eleanor G.; Do, Minh; Venturelli, Davide

    2014-01-01

    There are two common ways to evaluate algorithms: performance on benchmark problems derived from real applications and analysis of performance on parametrized families of problems. The two approaches complement each other, each having its advantages and disadvantages. The planning community has concentrated on the first approach, with few ways of generating parametrized families of hard problems known prior to this work. Our group's main interest is in comparing approaches to solving planning problems using a novel type of computational device - a quantum annealer - to existing state-of-the-art planning algorithms. Because only small-scale quantum annealers are available, we must compare on small problem sizes. Small problems are primarily useful for comparison only if they are instances of parametrized families of problems for which scaling analysis can be done. In this technical report, we discuss our approach to the generation of hard planning problems from classes of well-studied NP-complete problems that map naturally to planning problems or to aspects of planning problems that many practical planning problems share. These problem classes exhibit a phase transition between easy-to-solve and easy-to-show-unsolvable planning problems. The parametrized families of hard planning problems lie at the phase transition. The exponential scaling of hardness with problem size is apparent in these families even at very small problem sizes, thus enabling us to characterize even very small problems as hard. The families we developed will prove generally useful to the planning community in analyzing the performance of planning algorithms, providing a complementary approach to existing evaluation methods. We illustrate the hardness of these problems and their scaling with results on four state-of-the-art planners, observing significant differences between these planners on these problem families. Finally, we describe two general, and quite different, mappings of planning

  5. A Comparative Study of Strategic HRD Approaches for Workforce Planning in the Tourism Industry

    Science.gov (United States)

    Bartlett, Kenneth; Johnson, Karen; Schneider, Ingrid E.

    2006-01-01

    This study compares the outcomes of two often used approaches for strategic HRD planning. Using methods framed within a strategic HRD planning framework the outcomes of a qualitative primary data approach are examined against quantitative labor market projections in a study of the future Minnesota tourism workforce. Results show each planning…

  6. Information Technology Investment Strategy Planning: Balance Scorecard Approach

    Directory of Open Access Journals (Sweden)

    Henny Hendarti

    2011-05-01

    Full Text Available Purpose of this research are to prepare the IT investment strategy using Balanced Scorecard approach in the company where the appropriate planning of this IT investment strategy can maximize the competitive benefit in the company, and it also to recommended a strategy of IT investment that can be implemented and measure the rate of return from the IT investment in the company. Research Method used book studies, field studies, and analysis system. Book studies from the books and journal. Field studies done by observation, interview, and questioner, and analysis system done by analyzed the ongoing system in the company. The result from this analysis is a recommendation in investment IT such as sales module, payment module, and report module. Then for the conclusion, this information technology investment planning can be develop to another investment implementation such authorized website of the company and using PDA (Personal Digital AssistantIndex Terms - Planning, Information Technology, Investment, Balance Scorecard

  7. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    Science.gov (United States)

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  8. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  9. A Unified Approach to Model-Based Planning and Execution

    Science.gov (United States)

    Muscettola, Nicola; Dorais, Gregory A.; Fry, Chuck; Levinson, Richard; Plaunt, Christian; Norvig, Peter (Technical Monitor)

    2000-01-01

    Writing autonomous software is complex, requiring the coordination of functionally and technologically diverse software modules. System and mission engineers must rely on specialists familiar with the different software modules to translate requirements into application software. Also, each module often encodes the same requirement in different forms. The results are high costs and reduced reliability due to the difficulty of tracking discrepancies in these encodings. In this paper we describe a unified approach to planning and execution that we believe provides a unified representational and computational framework for an autonomous agent. We identify the four main components whose interplay provides the basis for the agent's autonomous behavior: the domain model, the plan database, the plan running module, and the planner modules. This representational and problem solving approach can be applied at all levels of the architecture of a complex agent, such as Remote Agent. In the rest of the paper we briefly describe the Remote Agent architecture. The new agent architecture proposed here aims at achieving the full Remote Agent functionality. We then give the fundamental ideas behind the new agent architecture and point out some implication of the structure of the architecture, mainly in the area of reactivity and interaction between reactive and deliberative decision making. We conclude with related work and current status.

  10. Regional power systems planning: a state of the art assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  11. A knowledge-based approach to improving and homogenizing intensity modulated radiation therapy planning quality among treatment centers: an example application to prostate cancer planning.

    Science.gov (United States)

    Good, David; Lo, Joseph; Lee, W Robert; Wu, Q Jackie; Yin, Fang-Fang; Das, Shiva K

    2013-09-01

    Intensity modulated radiation therapy (IMRT) treatment planning can have wide variation among different treatment centers. We propose a system to leverage the IMRT planning experience of larger institutions to automatically create high-quality plans for outside clinics. We explore feasibility by generating plans for patient datasets from an outside institution by adapting plans from our institution. A knowledge database was created from 132 IMRT treatment plans for prostate cancer at our institution. The outside institution, a community hospital, provided the datasets for 55 prostate cancer cases, including their original treatment plans. For each "query" case from the outside institution, a similar "match" case was identified in the knowledge database, and the match case's plan parameters were then adapted and optimized to the query case by use of a semiautomated approach that required no expert planning knowledge. The plans generated with this knowledge-based approach were compared with the original treatment plans at several dose cutpoints. Compared with the original plan, the knowledge-based plan had a significantly more homogeneous dose to the planning target volume and a significantly lower maximum dose. The volumes of the rectum, bladder, and femoral heads above all cutpoints were nominally lower for the knowledge-based plan; the reductions were significantly lower for the rectum. In 40% of cases, the knowledge-based plan had overall superior (lower) dose-volume histograms for rectum and bladder; in 54% of cases, the comparison was equivocal; in 6% of cases, the knowledge-based plan was inferior for both bladder and rectum. Knowledge-based planning was superior or equivalent to the original plan in 95% of cases. The knowledge-based approach shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced institutions. Copyright © 2013 Elsevier Inc. All rights reserved.

  12. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-05-20

    ...We, the U.S. Fish and Wildlife Service (Service), announce the availability of the Final Comprehensive Conservation Plan (CCP) and Finding of No Significant Impact (FONSI) for the Environmental Assessment (EA) for Swan Lake National Wildlife Refuge (NWR). Goals and objectives in the CCP describe how the agency intends to manage the refuge over the next 15 years.

  13. Multi-criteria analysis and systemic planning: Towards a tetra-logical approach to planning and assessment

    DEFF Research Database (Denmark)

    Leleur, Steen

    This paper presents systemic planning (SP) with emphasis on multi-criteria decision analysis (MCDA). Specifically, SP is presented as a “tetra-logical” methodology approach with MCDA as one out of four major method orientations. The Danish-Swedish Øresund Fixed Link is used as application example...

  14. Plan's CCCD approach - Country study PLAN-Bangladesh

    NARCIS (Netherlands)

    Uffelen, van G.J.

    2009-01-01

    PLAN Netherlands National Organisation has in coordination with PLAN International Headquarters commissioned an independent formative evaluation study to get systematic insight in the preconditions for appropriate functionality of Child Centred Community Development (CCCD) and to strengthen common

  15. A heuristic approach for short-term operations planning in a catering company

    DEFF Research Database (Denmark)

    Farahani, Poorya; Grunow, Martin; Günther, H.O.

    2009-01-01

    Certain types of food such as catering foods decay very rapidly. This paper investigates how the quality of such foods can be improved by shortening the time interval between production and delivery. To this end, we develop an approach which integrates short-term production and distribution...... planning in a novel iterative scheme. The production scheduling problem is solved through an MILP modeling approach which is based on a block planning formulation complemented by a heuristic simplification procedure. Our investigation was motivated by a catering company located in Denmark. The production...... configuration and the processes assumed in our numerical experiments reflect real settings from this company. First numerical results are reported which demonstrate the applicability of the proposed approach....

  16. A Mission Planning Approach for Precision Farming Systems Based on Multi-Objective Optimization

    Directory of Open Access Journals (Sweden)

    Zhaoyu Zhai

    2018-06-01

    Full Text Available As the demand for food grows continuously, intelligent agriculture has drawn much attention due to its capability of producing great quantities of food efficiently. The main purpose of intelligent agriculture is to plan agricultural missions properly and use limited resources reasonably with minor human intervention. This paper proposes a Precision Farming System (PFS as a Multi-Agent System (MAS. Components of PFS are treated as agents with different functionalities. These agents could form several coalitions to complete the complex agricultural missions cooperatively. In PFS, mission planning should consider several criteria, like expected benefit, energy consumption or equipment loss. Hence, mission planning could be treated as a Multi-objective Optimization Problem (MOP. In order to solve MOP, an improved algorithm, MP-PSOGA, is proposed, taking advantages of the Genetic Algorithms and Particle Swarm Optimization. A simulation, called precise pesticide spraying mission, is performed to verify the feasibility of the proposed approach. Simulation results illustrate that the proposed approach works properly. This approach enables the PFS to plan missions and allocate scarce resources efficiently. The theoretical analysis and simulation is a good foundation for the future study. Once the proposed approach is applied to a real scenario, it is expected to bring significant economic improvement.

  17. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2014-11-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  18. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2016-01-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  19. Multi-Robot Motion Planning: A Timed Automata Approach

    DEFF Research Database (Denmark)

    Quottrup, Michael Melholt; Bak, Thomas; Izadi-Zamanabadi, Roozbeh

    2004-01-01

    This paper describes how a network of interacting timed automata can be used to model, analyze, and verify motion planning problems in a scenario with multiple robotic vehicles. The method presupposes an infra-structure of robots with feed-back controllers obeying simple restriction on a planar...... grid. The automata formalism merely presents a high-level model of environment, robots and control, but allows composition and formal symbolic reasoning about coordinated solutions. Composition is achieved through synchronization, and the verification software UPPAAL is used for a symbolic verification...... then subsequently be used as a high-level motion plan for the robots. This paper reports on the timed automata framework, results of two verification experiments, promise of the approach, and gives a perspective for future research....

  20. Multi-Robot Motion Planning: A Timed Automata Approach

    DEFF Research Database (Denmark)

    Quottrup, Michael Melholt; Bak, Thomas; Izadi-Zamanabadi, Roozbeh

    This paper describes how a network of interacting timed automata can be used to model, analyze, and verify motion planning problems in a scenario with multiple robotic vehicles. The method presupposes an infra-structure of robots with feed-back controllers obeying simple restriction on a planar...... grid. The automata formalism merely presents a high-level model of environment, robots and control, but allows composition and formal symbolic reasoning about coordinated solutions. Composition is achieved through synchronization, and the verification software UPPAAL is used for a symbolic verification...... then subsequently be used as a high-level motion plan for the robots. This paper reports on the timed automata framework, results of two verification experiments, promise of the approach, and gives a perspective for future research....

  1. Social marketing: an approach to planned social change.

    Science.gov (United States)

    Kotler, P; Zaltman, G

    1971-07-01

    This article examines the applicability of marketing concepts to social causes and social change. Social marketing is defined as the design, implementation, and control of programs calculated to influence the acceptability of social ideas and involving considerations of product planning, pricing, communication, distribution and marketing research. Wiebe examined four social advertising campaigns and concluded that their effectiveness depended on the presence of adequate force, direction, adequate and compatible social mechanism, and distance (the "cost" of the new attitude as seen by message's message"s recepient). A marketing planning approach is not a guarantee for the achievement of social objectives; yet, it represents a bridging mechanism linking the knowledge of the behavioral scientist with the socially useful implementation of that knowledge.

  2. Coping planning: a patient-centred and strengths-focused approach to suicide prevention training.

    Science.gov (United States)

    Stallman, Helen M

    2018-04-01

    Suicide is a leading cause of premature death and, despite significant investment, the prevalence rate has remained relatively stable for more than a decade. Theoretically, the use of 'safety planning' as a response to suicidality likely maintains suicide as a potential solution for vulnerable people. This paper describes a theoretically-supported paradigm shift from safety planning to 'coping planning' to improve patient outcomes and improve the confidence and competence of clinicians working with people with suicidality. Coping planning is a strategy used to support people with acute distress. Its components of 'caring', 'collaborating' and 'connecting' reinforce existing strengths, promote self-efficacy and link people with more intensive supports, as needed. Coping planning overcomes the limitations of existing approaches. It reframes suicide prevention from managing patients disclosing suicidality to ensuring patients have minimally sufficient temporary support to help them cope. This approach has the potential to promote coping self-efficacy and prevent deterioration that leads to suicide.

  3. Methodical approaches in the Norwegian Master Plan for Water Resources

    International Nuclear Information System (INIS)

    Bowitz, Einar

    1997-01-01

    The Norwegian Master Plan for Water Resources instructs the management not to consider applications for concession to develop hydroelectric projects in the so called category II of the plan. These are the environmentally most controversial projects or the most expensive projects. This report discusses the methods used in this Master Plan to classify the projects. The question whether the assessments of the environmental disadvantages of hydropower development are reasonable is approached in two ways: (1) Compare the environmental costs imbedded in the Plan with direct assessments, and (2) Discuss the appropriateness of the methodology used for environmental evaluations in the Plan. The report concludes that (1) the environmental costs that can be derived from the ranking in the Plan are significantly greater than those following from direct evaluations, (2) the differences are generally so great that one may ask whether the methods used in the Plan overestimate the real environmental costs, (3) it seems to have been difficult to make a unified assessment of the environmental disadvantages, (4) the Plan has considered the economic impact on agriculture and forestry very roughly and indirectly, which may have contributed to overestimated environmental costs of hydropower development. 20 refs., 6 figs., 7 tabs

  4. Final Report on the Fuel Saving Effectiveness of Various Driver Feedback Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Gonder, J.; Earleywine, M.; Sparks, W.

    2011-03-01

    This final report quantifies the fuel-savings opportunities from specific driving behavior changes, identifies factors that influence drivers' receptiveness to adopting fuel-saving behaviors, and assesses various driver feedback approaches.

  5. A 3-Component Approach Incorporating Focus Groups in Strategic Planning for Sexual Violence Prevention.

    Science.gov (United States)

    Cruz, Theresa H; Hess, Julia Meredith; Woelk, Leona; Bear, Samantha

    2016-01-01

    Sexual violence is of special concern in New Mexico because of the presence of large priority populations in which its prevalence is high. This article describes a 3-component approach to developing a strategic plan to prevent sexual violence in the state that consisted of an advisory group, subject matter experts, and focus groups from geographically and demographically diverse communities. Both common and community-specific themes emerged from the focus groups and were included in the strategic plan. By incorporating community needs and experiences, this approach fosters increased investment in plan implementation.

  6. Integrated Transport Planning Framework Involving Combined Utility Regret Approach

    DEFF Research Database (Denmark)

    Wang, Yang; Monzon, Andres; Di Ciommo, Floridea

    2014-01-01

    Sustainable transport planning requires an integrated approach involving strategic planning, impact analysis, and multicriteria evaluation. This study aimed at relaxing the utility-based decision-making assumption by newly embedding anticipated-regret and combined utility regret decision mechanisms...... in a framework for integrated transport planning. The framework consisted of a two-round Delphi survey, integrated land use and transport model for Madrid, and multicriteria analysis. Results show that (a) the regret-based ranking has a similar mean but larger variance than the utility-based ranking does, (b......) the least-regret scenario forms a compromise between the desired and the expected scenarios, (c) the least-regret scenario can lead to higher user benefits in the short term and lower user benefits in the long term, (d) the utility-based, the regret-based, and the combined utility- and regret...

  7. Leader-Follower Approach to Gas-Electricity Expansion Planning Problem

    DEFF Research Database (Denmark)

    Khaligh, Vahid; Oloomi Buygi, Majid; Anvari-Moghaddam, Amjad

    2018-01-01

    investment in capacity addition to the generation and transmission levels while considers the limitations on fuel consumption. On the other hand gas operator decides about investment in gas pipelines expansions considering the demanded gas by the electricity network. In this planning model for a joint gas......The main purpose of this paper is to develop a method for sequential gas and electricity networks expansion planning problem. A leader-follower approach performs the expansion planning of the joint gas and electricity networks. Electric system operator under adequacy incentive decides about......-electricity network, supply and demand are matched together while adequacy of fuel for gas consuming units is also guaranteed. To illustrate the effectiveness of the proposed method Khorasan province of Iran is considered as a case study which has a high penetration level of gas-fired power plants (GFPP). Also...

  8. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  9. MnDOT Library strategic plan : final report.

    Science.gov (United States)

    2017-06-01

    MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...

  10. South Dakota ITS/CVO business plan : final business plan

    Science.gov (United States)

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  11. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  12. A review of plan library approaches in adaptive radiotherapy of bladder cancer.

    Science.gov (United States)

    Collins, Shane D; Leech, Michelle M

    2018-05-01

    Large variations in the shape and size of the bladder volume are commonly observed in bladder cancer radiotherapy (RT). The clinical target volume (CTV) is therefore frequently inadequately treated and large isotropic margins are inappropriate in terms of dose to organs at risk (OAR); thereby making adaptive radiotherapy (ART) attractive for this tumour site. There are various methods of ART delivery, however, for bladder cancer, plan libraries are frequently used. A review of published studies on plan libraries for bladder cancer using four databases (Pubmed, Science Direct, Embase and Cochrane Library) was conducted. The endpoints selected were accuracy and feasibility of initiation of a plan library strategy into a RT department. Twenty-four articles were included in this review. The majority of studies reported improvement in accuracy with 10 studies showing an improvement in planning target volume (PTV) and CTV coverage with plan libraries, some by up to 24%. Seventeen studies showed a dose reduction to OARs, particularly the small bowel V45Gy, V40Gy, V30Gy and V10Gy, and the rectal V30Gy. However, the occurrence of no suitable plan was reported in six studies, with three studies showing no significant difference between adaptive and non-adaptive strategies in terms of target coverage. In addition, inter-observer variability in plan selection appears to remain problematic. The additional resources, education and technology required for the initiation of plan library selection for bladder cancer may hinder its routine clinical implementation, with eight studies illustrating increased treatment time required. While there is a growing body of evidence in support of plan libraries for bladder RT, many studies differed in their delivery approach. The advent of the clinical use of the MRI-linear accelerator will provide RT departments with the opportunity to consider daily online adaption for bladder cancer as an alternate to plan library approaches.

  13. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  14. A strategic planning approach for operational-environmental tradeoff assessments in terminal areas

    Science.gov (United States)

    Jimenez, Hernando

    This thesis proposes the use of well established statistical analysis techniques, leveraging on recent developments in interactive data visualization capabilities, to quantitatively characterize the interactions, sensitivities, and tradeoffs prevalent in the complex behavior of airport operational and environmental performance. Within the strategic airport planning process, this approach is used in the assessment of airport performance under current/reference conditions, as well as in the evaluation of terminal area solutions under projected demand conditions. More specifically, customized designs of experiments are utilized to guide the intelligent selection and definition of modeling and simulation runs that will yield greater understanding, insight, and information about the inherent systemic complexity of a terminal area, with minimal computational expense. For the research documented in this thesis, a modeling and simulation environment was created featuring three primary components. First, a generator of schedules of operations, based primarily on previous work on aviation demand characterization, whereby growth factors and scheduling adjustment algorithms are applied on appropriate baseline schedules so as to generate notional operational sets representative of consistent future demand conditions. The second component pertains to the modeling and simulation of aircraft operations, defined by a schedule of operations, on the airport surface and within its terminal airspace. This component is a discrete event simulator for multiple queuing models that captures the operational architecture of the entire terminal area along with all the necessary operational logic pertaining to simulated Air Traffic Control (ATC) functions, rules, and standard practices. The third and final component is comprised of legacy aircraft performance, emissions and dispersion, and noise exposure modeling tools, that use the simulation history of aircraft movements to generate estimates

  15. An Ensemble Approach to Knowledge-Based Intensity-Modulated Radiation Therapy Planning

    Directory of Open Access Journals (Sweden)

    Jiahan Zhang

    2018-03-01

    Full Text Available Knowledge-based planning (KBP utilizes experienced planners’ knowledge embedded in prior plans to estimate optimal achievable dose volume histogram (DVH of new cases. In the regression-based KBP framework, previously planned patients’ anatomical features and DVHs are extracted, and prior knowledge is summarized as the regression coefficients that transform features to organ-at-risk DVH predictions. In our study, we find that in different settings, different regression methods work better. To improve the robustness of KBP models, we propose an ensemble method that combines the strengths of various linear regression models, including stepwise, lasso, elastic net, and ridge regression. In the ensemble approach, we first obtain individual model prediction metadata using in-training-set leave-one-out cross validation. A constrained optimization is subsequently performed to decide individual model weights. The metadata is also used to filter out impactful training set outliers. We evaluate our method on a fresh set of retrospectively retrieved anonymized prostate intensity-modulated radiation therapy (IMRT cases and head and neck IMRT cases. The proposed approach is more robust against small training set size, wrongly labeled cases, and dosimetric inferior plans, compared with other individual models. In summary, we believe the improved robustness makes the proposed method more suitable for clinical settings than individual models.

  16. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    International Nuclear Information System (INIS)

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM's objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources

  17. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM`s objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources.

  18. An integrated approach to strategic planning in the civilian high-level radioactive waste management program

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Katz, J.; Redmond, R.J.

    1992-01-01

    This paper describes the approach that the Office of Civilian Radioactive Waste Management (OCRWM) of the Department of Energy (DOE) is taking to the task of strategic planning for the civilian high-level radioactive waste management program. It highlights selected planning products and activities that have emerged over the past year. It demonstrates that this approach is an integrated one, both in the sense of being systematic on the program level but also as a component of DOE strategic planning efforts. Lastly, it indicates that OCRWM strategic planning takes place in a dynamic environment and consequently is a process that is still evolving in response to the demands placed upon it

  19. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  20. Closure Plan for Active Low Level Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    2000-11-16

    This plan has been prepared in response to direction from the U.S. Department of Energy. The purpose of the plan is to define approaches that will be implemented to ensure protection of the public and the environment when active Low-Level Burial Grounds (LLBGs) at the Hanford Site are closed. Performance assessments for active burial grounds in the 200 East and West 200 Areas provide current estimates of potential environmental contamination and doses to the ''maximum exposed individual'' from burial ground operation and closure and compare dose estimates to performance objective dose limits for the facilities. This is an Operational Closure Plan. The intent of the guidance in DOE Order 435.1 is that this plan will be a living document, like the facility performance assessments, and will be revised periodically through the operational life of the LLBGs to reflect updated information on waste inventory. management practices, facility transition planning, schedule dates, assessments of post-closure performance, and environmental consequences. Out year dates identified in this plan are tentative. A Final Closure Plan will be prepared in the future when the timing and extent of closure-related activities for LLBGs can be established with greater certainty. After current operations at the LLBGs are concluded, this plan proposes transitioning of these facilities to the Environmental Restoration Program. This action will enable the Environmental Restoration Program to design and implement consistent and coordinated final remedial actions for active and inactive LLBGs. Active and inactive burial grounds in the 200 West and 200 East Areas are commingled. This plan describes approaches that will be implemented during Interim Closure, Final Closure, and Institutional Control Periods to prepare LLBGs for surface barriers, and the construction of barriers, as well as the scope of inspection, monitoring and maintenance practices that will be performed during

  1. Analyzing an Integrated Planning Approach Among Planning Scale and Sector a Case Study of Malang City's Vision as the City of Education

    OpenAIRE

    Amirudin, Akhmad; Fefta Wijaya, Andy; Yossomsakdi, Samrit

    2014-01-01

    Integrated planning is more needed by government today because of the complexity of problems and limited resources. Integrated planning can undertake the problems by giving comprehensive solution and provide how much resources are needed to reach the goal. Integrated planning approach is implied to provide better tools to guide actions towards the development of cities, improvement of human conditions, and ultimately a better urbanism. So the research focused on integrated planning in Malang ...

  2. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    Science.gov (United States)

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  3. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  4. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... HEALTH AND HUMAN SERVICES Office of Consumer Information and Insurance Oversight 45 CFR Part 147 RIN 0950-AA17 [OCIIO-9991-IFC2] Amendment to the Interim Final Rules for Group Health Plans and Health Insurance... Administration, Department of Labor; Office of Consumer Information and Insurance Oversight, Department of Health...

  5. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-051552, LLCAD0700 L51010000 FX0000 LVRWB10B3980] Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior...

  6. Participatory approach in planning for low carbon and eco-village: A case of Felda Taib Andak

    International Nuclear Information System (INIS)

    Ngah, I; Zulkifli, A S

    2014-01-01

    Participatory approaches have becoming an important tool in planning of sustainable communities. Although participation is conceived as a malleable concept there are certain methods that planners can adopt to ensure a meaningful participation. This paper will provide some experiences and lessons on how participatory planning could be carried out with local people, the role of planners in the process of plan preparation, implementation and the outcome. This paper first explores some of the meanings of participation, the criteria of participation and the approaches of participation in planning for sustainable community. The second part is a description and discussion of how participatory approach in planning was applied in planning for low carbon and eco-village in Iskandar Malaysia based on a case study of planning of Felda Taib Andak scheme. The participatory approach involved a series of meetings, site visit and focus group discussions with representative of the Felda Village to come out with action plan and actual implementation. From focus group discussions a roadmap consisted of a vision and objectives and a dozen actions were formulated and adopted. In the process of implementation the main implementation and coordination committee was form in which the author (planner) is one of its members to look into fund raising and implementation strategies together with the local people. Several task forces or sub committees responsible to implement the dozen actions were also formed. The outcome was encouraging in which some of the actions such as planting of bamboo trees, reduction of pollution from oil palm factory and bicycling activities has been implemented and shown progress. The paper also highlights some of the issues and challenges in participatory planning

  7. Narrative Financial Therapy: Integrating a Financial Planning Approach with Therapeutic Theory

    Directory of Open Access Journals (Sweden)

    Megan A. McCoy

    2014-03-01

    Full Text Available The article serves as one of the first attempts to develop an integrated theoretical approach to financial therapy that can be used by practitioners from multiple disciplines. The presented approach integrates the components of the six-step financial planning process with components of empirically-supported therapeutic methods. This integration provides the foundation for a manualized approach to financial therapy, shaped by the writings of narrative theorists and select cognitive-behavioral interventions that can be used both by mental health and financial professionals.

  8. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    Science.gov (United States)

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  9. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Science.gov (United States)

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  10. Optimal Control Approaches to the Aggregate Production Planning Problem

    Directory of Open Access Journals (Sweden)

    Yasser A. Davizón

    2015-12-01

    Full Text Available In the area of production planning and control, the aggregate production planning (APP problem represents a great challenge for decision makers in production-inventory systems. Tradeoff between inventory-capacity is known as the APP problem. To address it, static and dynamic models have been proposed, which in general have several shortcomings. It is the premise of this paper that the main drawback of these proposals is, that they do not take into account the dynamic nature of the APP. For this reason, we propose the use of an Optimal Control (OC formulation via the approach of energy-based and Hamiltonian-present value. The main contribution of this paper is the mathematical model which integrates a second order dynamical system coupled with a first order system, incorporating production rate, inventory level, and capacity as well with the associated cost by work force in the same formulation. Also, a novel result in relation with the Hamiltonian-present value in the OC formulation is that it reduces the inventory level compared with the pure energy based approach for APP. A set of simulations are provided which verifies the theoretical contribution of this work.

  11. Approach and practices of district energy planning to achieve low carbon outcomes in China

    International Nuclear Information System (INIS)

    Xu, Baoping; Zhou, Shaoxiang; Hao, Lin

    2015-01-01

    District energy planning is an important methodology to assist in realizing a lower carbon target. However, district energy planning has not yet been incorporated into the statutory planning system in China, primarily because there are no clear standards and specifications for these plans. In this paper, we propose a general framework and low carbon estimation method for district energy planning, which is based on evaluating the low carbon energy planning practices of several new districts in China. In addition, several key points of concern in the planning process are extracted and discussed: overall infrastructure planning; co-operation between city planning and other special low carbon eco-planning; investment, financing and profitable operation; planning management mechanisms; and the management of the construction of the energy system to coincide with the project schedule. We carried out a case study of a low carbon energy plan for a new district of Beijing to evaluate our framework. Finally, we conclude that to realize the low carbon target, regional energy planning covering technologies, the market and management should be standardized as soon as possible. -- Highlights: •A general framework for district energy planning is proposed. •A case study of a low carbon energy plan for a new district is carried out. •District energy planning should be standardized as soon as possible. •The most suitable spatial scale for energy planning is at the municipal level

  12. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    Science.gov (United States)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  13. Planned change or emergent change implementation approach and nurses' professional clinical autonomy.

    Science.gov (United States)

    Luiking, Marie-Louise; Aarts, Leon; Bras, Leo; Grypdonck, Maria; van Linge, Roland

    2017-11-01

    Nurses' clinical autonomy is considered important for patients' outcome and influenced by the implementation approach of innovations. Emergent change approach with participation in the implementation process is thought to increase clinical autonomy. Planned change approach without this participation is thought not to increase clinical autonomy. Evidence of these effects on clinical autonomy is however limited. To examine the changes in clinical autonomy and in personal norms and values for a planned change and emergent change implementation of an innovation, e.g. intensive insulin therapy. Prospective comparative study with two geographically separated nurses' teams on one intensive care unit (ICU), randomly assigned to the experimental conditions. Data were collected from March 2008 to January 2009. Pre-existing differences in perception of team and innovation characteristics were excluded using instruments based on the innovation contingency model. The Nursing Activity Scale was used to measure clinical autonomy. The Personal Values and Norms instrument was used to assess orientation towards nursing activities and the Team Learning Processes instrument to assess learning as a team. Pre-implementation the measurements did not differ. Post-implementation, clinical autonomy was increased in the emergent change team and decreased in the planned change team. The Personal Values and Norms instrument showed in the emergent change team a decreased hierarchic score and increased developmental and rational scores. In the planned change team the hierarchical and group scores were increased. Learning as a team did not differ between the teams. In both teams there was a change in clinical autonomy and orientation towards nursing activities, in line with the experimental conditions. Emergent change implementation resulted in more clinical autonomy than planned change implementation. If an innovation requires the nurses to make their own clinical decisions, an emergent change

  14. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  15. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  16. Security planning an applied approach

    CERN Document Server

    Lincke, Susan

    2015-01-01

    This book guides readers through building an IT security plan. Offering a template, it helps readers to prioritize risks, conform to regulation, plan their defense and secure proprietary/confidential information. The process is documented in the supplemental online security workbook. Security Planning is designed for the busy IT practitioner, who does not have time to become a security expert, but needs a security plan now. It also serves to educate the reader of a broader set of concepts related to the security environment through the Introductory Concepts and Advanced sections. The book serv

  17. Demand planning approaches employed by clothing industry stakeholders in Gauteng, South Africa

    OpenAIRE

    Ntombizodwa J. Matsoma; Intaher M. Ambe

    2017-01-01

    Background: The decline in the productivity of the South African clothing industry was attributed to changing trends in the number of clothing production organisations, which together with a decline in manufacturing output and a fluctuation in employment had all contributed to complexities in demand planning. Purpose: This article investigates demand planning approaches in the clothing industry in Gauteng. Method: A descriptive study was conducted based on a structured questionnaire. ...

  18. RTSTEP regional transportation simulation tool for emergency planning - final report.

    Energy Technology Data Exchange (ETDEWEB)

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X. (Energy Systems)

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  19. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  20. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    Science.gov (United States)

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  1. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    International Nuclear Information System (INIS)

    Bjarnadottir, H.; Hilding-Rydevik, T.

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented. Our perception of

  2. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  3. Intelligent transportation systems business plan for Kentucky : final report.

    Science.gov (United States)

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  4. Family planning and the labor sector: soft-sell approach.

    Science.gov (United States)

    Teston, R C

    1981-01-01

    Dr. Cesar T. San Pedro, the director of the company clinic at Dole Philippines plantation in South Cotabato in Region 11, has been pressing the management to initiate a comprehensive family planning programs for their 10,000 workers. Pedro wants the Ministry of Labor and Employment (MOLE) to enforce its population program. The situation at Dole is one that requires an arbiter. Since 1977, there has not been a Population/Family Planning Officer (PFPO) for the area, and it is not possible to monitor closely if the qualified firms are following the labor code and providing family planning services to their employees. Susan B. Dedel, executive director of the PFPO, has reported that the office has sought to endear its program to the private sector by showing that family planning is also profitable for the firm. This "soft-sell" approach has been the hallmark of the MOLE-PFPO since it began in 1975 as a joint project of the Commission on Population (POPCOM), United Nations Fund for Population Activities (UNFPA), and International Labor Organization (ILO). Some critics have argued that this liberal style of implementation is short-selling the program. They point out that the Labor Code of 1973 enforces all establishments with at least 200 employees to have a free in-plant family planning program which includes clinic care, paid motivators, and volunteer population workers. The critics seem, at 1st glance, to have the statistics on their side. In its 5 years of operation, the PFPO has convinced only 137,000 workers to accept family planning. This is quite low, since of the 1.2 million employed by the covered firms, 800,000 are eligible for the MOLE program. Much of the weakness of the implementation is said to be due to the slow activation of the Labor-Management Coordinating Committees (LMCC). The critics maintain that because of the liberal enforcement of Department Order No. 9, the recalcitrant firms see no reason to comply. Dedel claims that the program is on the

  5. Claims Procedure for Plans Providing Disability Benefits; 90-Day Delay of Applicability Date. Final rule; delay of applicability

    Science.gov (United States)

    2017-11-29

    This document delays for ninety (90) days--through April 1, 2018--the applicability of a final rule amending the claims procedure requirements applicable to ERISA-covered employee benefit plans that provide disability benefits (Final Rule). The Final Rule was published in the Federal Register on December 19, 2016, became effective on January 18, 2017, and was scheduled to become applicable on January 1, 2018. The delay announced in this document is necessary to enable the Department of Labor to carefully consider comments and data as part of its effort, pursuant to Executive Order 13777, to examine regulatory alternatives that meet its objectives of ensuring the full and fair review of disability benefit claims while not imposing unnecessary costs and adverse consequences.

  6. Linear Temporal Logic-based Mission Planning

    Directory of Open Access Journals (Sweden)

    Anil Kumar

    2016-06-01

    Full Text Available In this paper, we describe the Linear Temporal Logic-based reactive motion planning. We address the problem of motion planning for mobile robots, wherein the goal specification of planning is given in complex environments. The desired task specification may consist of complex behaviors of the robot, including specifications for environment constraints, need of task optimality, obstacle avoidance, rescue specifications, surveillance specifications, safety specifications, etc. We use Linear Temporal Logic to give a representation for such complex task specification and constraints. The specifications are used by a verification engine to judge the feasibility and suitability of plans. The planner gives a motion strategy as output. Finally a controller is used to generate the desired trajectory to achieve such a goal. The approach is tested using simulations on the LTLMoP mission planning tool, operating over the Robot Operating System. Simulation results generated using high level planners and low level controllers work simultaneously for mission planning and controlling the physical behavior of the robot.

  7. Quinault Indian Nation Renewable Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Don Hopps, Institute for Washington' s Future; Jesse Nelson, Institute for Washington' s Future

    2006-11-28

    . This plan calls for commercial-scale production only, with the QIN being the first “customer” for the product. This plan favors employing the pyrolysis technology to produce bio-oil, heat, and char. We favor this approach and technology because it is the most cost effective way to use the available resource. Its main product, bio-oil, has proven utility for the production of heat and electricity. It has promise for use as an alternative fuel, which is a much higher value than present uses of wood and it meets the QIN need for flexibility, scalability, and portability. Char, the secondary product from the pyrolysis process, has proven value-added uses. In addition to these direct benefits, the use of biomass in pyrolysis technology has significant indirect benefits. These benefits include the fact that the technology is a good fit with the Nation’s cultural values, i.e., environmental protection and the holistic use of a resource. It fits well with current QIN enterprises. For example, char could be processed into a charcoal co-product for QIN fish. Finally, the QIN can become a leader in developing and demonstrating this innovative approach to the use of wood. This plan proposes key organization steps to insure both excellent implementation of the plan and taking the best advantage of the processes and facilities put in place. This plan calls for two new QIN organizations: an energy production/distribution corporation and a community development corporation. The production/distribution corporation can be either a utility or a business enterprise that develops and markets renewable energy. The community development corporation can be a not-for-profit to support the QIN in taking best advantage of its energy opportunities. The production and distribution corporation is the subject of a further business planning effort now underway. This plan envisions a community development corporation that works directly with the Business Committee on research, education, and

  8. Designing a strategic plan development approach for integrated area development projects

    NARCIS (Netherlands)

    de Kort, Inge

    2009-01-01

    Increasingly, it has become evident that spatial problems can no longer be resolved in isolation, but should be solved in conjunction with other development-related issues. Interest in integrated area development is growing, and a more integrated planning approach is desired. In this design-based

  9. From RLP to SLP: Two Different Approaches to Landscape Planning

    Directory of Open Access Journals (Sweden)

    Federica Isola

    2014-05-01

    Full Text Available The concepts of governance and sustainable development are concepts related to complex systems and processes, in terms of problems and implications, with a variety of people involved in different ways and whose number has increased over time. In the processes of regional governance, the concept of sustainability interacts with the environment and to the territory. Since 2006, year of approval of its Regional Landscape Plan (RLP, the Region of Sardinia, has been experiencing a new era of regional governance characterisedcharacterized by a new understanding of environmental resources; and by a different relational approach among regional government bodies, as well as between them and local communities. In 2009 began the revision phase of the plan recently concluded with the approval of the Sardinia Landscape Plan (SLP. This paper will highlight a comparison between RLP and SLP focusing on three aspects: i the concept of protection and safeguarding of the territory; ii the institutional governance; iii the application of the Strategic Environmental Assessment.

  10. Proposing an Aggregate Production Planning Model by Goal Programming Approach, a Case Study

    Directory of Open Access Journals (Sweden)

    Mansoureh Farzam Rad

    2014-06-01

    Full Text Available Production planning is one of the most important functions in the process of production management. Production planning in the intermediate range of time is termed as aggregate production planning (APP. Aggregate production planning is an important upper level planning activity in a production management system. The present study tries to suggest an aggregate production planning model for products of Hafez tile factory during one year. Due to this fact that the director of the company seeks 3 main objectives to determine the optimal production rate, the linear goal planning method was employed. After solving the problem, in order to examine the efficiency and the distinctiveness of this method in compare to linear programming, the problem was modeled just by considering one objective then was solved by linear programming approach. The findings revealed the goal programming with multi objectives resulted more appropriate solution rather than linear programming with just one objective.

  11. Methodological approach to participatory formulation of agricultural technical assistance plans with territorial approach

    Directory of Open Access Journals (Sweden)

    Holmes Rodríguez Espinosa

    2015-10-01

    Full Text Available The collective identification of needs and shared decision-making in projects’ formulation for agricultural development is a process that requires the identification of participatory methodologies to promote active and reflective engagement of producers. The aim of this study was to evaluate a methodological approach for participatory formulation of technical assistance plan with territorial approach. Matrix analysis for the identification and prioritization of the most limiting technical assistance factors for milk production was performed and alternative solutions were defined, through participatory workshops with farmers. The results show the advantages of a collective reflection with stakeholders and quantitative tools reducing subjectivity in decision-making, improving participation in their own development and identifying acceptable alternatives to farmers and viable to the municipality in order to improve lack of pasture and forage management, implementation of good agricultural practices GAP and rational use of agrochemicals.

  12. ZONAL IMPACT ANALYSIS OF A STRATEGIC PLANNING APPROACH FOR LAND DEVELOPMENT CONTROLS

    Directory of Open Access Journals (Sweden)

    Karin LIMAPORNWANITCH

    2004-01-01

    Full Text Available Due to rapid urban developments in developing cities, the integration of land-use and transportation planning is very necessary. However, up-to-date land-use and transportation interaction planning is still difficult, because of rapid urbanization and complex relationships. The lack of human resources, budget, and necessary data are some of the hindrances. The planners in Bangkok have tried to utilize Traffic Impact Assessment (TIA in harmonizing land developments and transportation improvements, but without a complete land-use comprehensive plan, the TIA cannot effectively manage urbanization. This paper intends to propose a Zonal Impact Analysis (ZIA framework as a strategic planning tool to balance travel demands of land developments and performance of transportation systems over urban areas. First, the land-use planning situation in Bangkok is explained, afterwards the framework is described. The framework is applied into Bangkapi areas as a case study. Both single and simultaneous development cases are considered. It was found that more comprehensive development alternatives were established. The most suitable zone for a single project is Zone 179, as the advantages of location in the center of radial networks, so full accessibility can be provided. Without any network improvements in Zone 179, the simultaneous developments should be implemented in Zone 168 and 173, as high capacities of the expressway are available. The results give a better understanding on the characteristics of land-use and transportation planning in Bangkapi. Finally, it was emphasized that the ZIA framework is a strategic planning alternative to increase the capabilities of growth management for sustainable developments.

  13. Institutional Framework for Collaborative Urban Planning in Afghanistan in view of the Transferring Process of International Urban Planning Systems

    Directory of Open Access Journals (Sweden)

    Habib Ahmad Javid

    2015-09-01

    Full Text Available This article provides an overview of Afghanistan’s urban planning institutional change in certain historical periods, particular dilemmas within the current urban planning system and its gradual shift from totalitarian urban planning approaches practiced during 1960s - 1980s to a different form of planning being practiced by the current government. In addition, it will seek to analyze the ease and tension caused by the three recent phenomena that have emerged after the establishment of a new democratic government in Afghanistan since 2001, such as private sector-led urban development, international funding community’s and NGOs’ role in planning and the delegation of certain roles given to different tires of the government. Another purpose of this work is to analyze the collaboration among urban planning institutions, private sector, international funding community, NGOs and civil society within the current urban planning arena of Afghanistan and to identify the roles, responsibilities and functions of urban planning institutions in different levels of urban governance. Finally find out what possible and necessary institutional changes and framework are needed in order to foster grassroots based inter-institutional collaboration and partnership among various tires of government. The methodological approach to the research is based on qualitative data analysis. For the analysis purpose, government urban planning data and in-depth, semi-structured, face-to-face interviews with Afghanistan’s urban planning officials were thematically used, which provided in-depth information about involved actors in urban planning and their roles and relationships.

  14. Planning and support materials in teaching story comprehension from the interbehavioral approach

    Directory of Open Access Journals (Sweden)

    Ana Cristina Mascareño Bórquez

    2017-12-01

    Full Text Available Despite the latest changes in educational reforms within the country, curriculum plans and ongoing program renewals aimed at resolving the educational gap reflected in national statistics, the results remain unfavorable. This leads to reflection and analysis to generate and implement new forms and teaching strategies. The purpose of this paper is to present the design of an alternative proposal for planning and the development of support materials, developed according to the second block of sixth grade primary education, in two expected learning contained in the formal basic education curriculum. Centered on the interaction in teaching-learning and according to different levels of functional aptitude. Subsequently it underwent a process of piloting and revision by experts to prove the pertinence of the planning and precisions for its implementation. As results, the support materials and the planning proposal are presented and discussed with the authors who have worked on planning proposals from the inter-behavioral approach.

  15. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  16. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    Energy Technology Data Exchange (ETDEWEB)

    Bjarnadottir, H.; Hilding-Rydevik, T. [Nordregio, Stockholm (Sweden)

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented

  17. An approach to improve Romanian geological repository planning

    International Nuclear Information System (INIS)

    Andrei, Veronica; Prisecaru, Ilie

    2016-01-01

    International standards recommend typical phases to be included within any national program for the development of a geological repository dedicated to disposal of the high level radioactive wastes generated in countries using nuclear power. However, these are not universally applicable and the content of each of these phases may need to be adapted for each national situation and regulatory and institutional framework. Several national geological repository programs have faced failures in schedules and have revised their programs to consider an adapted phased management approach. The authors have observed that in the case of those countries in the early phases of a geological repository program where boundary conditions have not been fully defined, international recommendations for handling delays/failures in the national program might not immediately help. This paper considers a case study of the influences of the national context risks on the current planning schedule of the Romanian national geological repository. It proposes an optimum solution for an integrated response to any significant adverse impact arising from these risks, enabling sustainable program planning

  18. Planning for strategic change? A participative planning approach for community hospitals.

    Science.gov (United States)

    MacDonald, S K; Beange, J E; Blachford, P C

    1992-01-01

    Strategic planning is becoming to hospitals what business case analysis is to private corporations. In fact, this type of planning is becoming essential for the professional management of Ontario hospitals. The participative strategic planning process at Toronto East General Hospital (TEGH) is an example of how a professionally structured and implemented strategic planning process can be successfully developed and implemented in a community hospital. In this article, the environmental factors driving planning are reviewed and the critical success factors for the development and implementation of a strategic plan are examined in the context of TEGH's experience.

  19. Self-interested Planning Agents using Plan Repair

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    We present a novel approach to multiagent planning for selfinterested agents. The main idea behind our approach is that multiagent planning systems should be built upon (singleagent) plan repair systems. In our system agents can exchange goals and subgoals through an auction, using their own

  20. Self-interested planning agents using plan repair

    NARCIS (Netherlands)

    R.P.J. van der Krogt; M.M. de Weerdt (Mathijs)

    2005-01-01

    htmlabstractWe present a novel approach to multiagent planning for selfinterested agents. The main idea behind our approach is that multiagent planning systems should be built upon (singleagent) plan repair systems. In our system agents can exchange goals and subgoals through an auction, using

  1. An integrated approach for facilities planning by ELECTRE method

    Science.gov (United States)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with

  2. Patient Care Planning: An Interdisciplinary Approach

    OpenAIRE

    Prophet, Colleen M.

    1989-01-01

    The INFORMM Patient Care Planning System provides interdepartmental communication and individualized patient care plans based upon current standards of care. This interdisciplinary system facilitates the identification of patient problems and nursing diagnoses as well as patient care orders. The selected nurses' and physicians' orders are integrated and organized by care plan categories in printouts. As a system by-product, Patient Care Planning automatically generates and calculates patient ...

  3. Beyond Lip Service: A Council Approach to Planning for Behaviour Change

    Science.gov (United States)

    Collier, Grahame; Smith, Phil

    2009-01-01

    The Council of the City of Sydney--like many other councils around Australia--has embarked on a whole-of-council approach to establishing sustainable behaviours amongst its residents. In developing its "Residential Environmental Action Plan"--designed to motivate and bring about real change in resident choices and behaviours--the City…

  4. Focal species and landscape "naturalness" corridor models offer complementary approaches for connectivity conservation planning

    Science.gov (United States)

    Meade Krosby; Ian Breckheimer; D. John Pierce; Peter H. Singleton; Sonia A. Hall; Karl C. Halupka; William L. Gaines; Robert A. Long; Brad H. McRae; Brian L. Cosentino; Joanne P. Schuett-Hames

    2015-01-01

    Context   The dual threats of habitat fragmentation and climate change have led to a proliferation of approaches for connectivity conservation planning. Corridor analyses have traditionally taken a focal species approach, but the landscape ‘‘naturalness’’ approach of modeling connectivity among areas of low human modification has gained popularity...

  5. The planning of decommissioning activities within nuclear facilities - Generating a Baseline Decommissioning Plan

    International Nuclear Information System (INIS)

    Meek, N.C.; Ingram, S.; Page, J.

    2003-01-01

    BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] → [Review project and conduct Characterisation review of power station] → [Identify work packages] → [Set up WBS to level 3] → [Assign work packages] → [Update WBS to level 4] →[Develop cost model] → [Develop logic network] → [Develop risk management procedure] ] → [Develop project strategy document]→ [Work package

  6. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy

    International Nuclear Information System (INIS)

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-01-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1–2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85–6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins.

  7. A new methodological approach for PET implementation in radiotherapy treatment planning.

    Science.gov (United States)

    Bellan, Elena; Ferretti, Alice; Capirci, Carlo; Grassetto, Gaia; Gava, Marcello; Chondrogiannis, Sotirios; Virdis, Graziella; Marzola, Maria Cristina; Massaro, Arianna; Rubello, Domenico; Nibale, Otello

    2012-05-01

    In this paper, a new methodological approach to using PET information in radiotherapy treatment planning has been discussed. Computed tomography (CT) represents the primary modality to plan personalized radiation treatment, because it provides the basic electron density map for correct dose calculation. If PET scanning is also performed it is typically coregistered with the CT study. This operation can be executed automatically by a hybrid PET/CT scanner or, if the PET and CT imaging sets have been acquired through different equipment, by a dedicated module of the radiotherapy treatment planning system. Both approaches have some disadvantages: in the first case, the bore of a PET/CT system generally used in clinical practice often does not allow the use of certain bulky devices for patient immobilization in radiotherapy, whereas in the second case the result could be affected by limitations in window/level visualization of two different image modalities, and the displayed PET volumes can appear not to be related to the actual uptake into the patient. To overcome these problems, at our centre a specific procedure has been studied and tested in 30 patients, allowing good results of precision in the target contouring to be obtained. The process consists of segmentation of the biological target volume by a dedicated PET/CT console and its export to a dedicated radiotherapy system, where an image registration between the CT images acquired by the PET/CT scanner and a large-bore CT is performed. The planning target volume is contoured only on the large-bore CT and is used for virtual simulation, to individuate permanent skin markers on the patient.

  8. Mission Operations Planning with Preferences: An Empirical Study

    Science.gov (United States)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  9. Beaufort Sea planning area oil and gas Lease Sale 170. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-02-01

    This environmental impact statement (EIS) assesses Lease Sale 170 proposed for August 1998 and comprised of 363 lease blocks in the Beaufort Sea planning area. The analysis addresses the significant environmental and socioeconomic concerns identified in the scoping process. Scoping consisted of input from State and Federal agencies, the petroleum industry, Native groups, environmental and public interest groups, and concerned individuals. The potential effects expected from the interaction between environmental resources and OCS-related activities were determined with respect to available scientific information and traditional knowledge. This EIS incorporates information from the Final EIS for the Beaufort Sea OCS Sale 144 (USD01, MMS, 1996a)

  10. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  11. An Ecological Approach to Seeking and Utilising the Views of Young People with Intellectual Disabilities in Transition Planning

    Science.gov (United States)

    Small, Neil; Raghavan, Raghu; Pawson, Nicole

    2013-01-01

    Transition planning using a person-centred approach has, in the main, failed to shape service provision. We offer an alternative based on an ecological understanding of human development linked to public health approaches that prioritise whole system planning. A total of 43 young people with intellectual disabilities, in Bradford, England, who…

  12. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  13. Tank Waste Remediation System Inactive Miscellaneous Underground Storage Tanks Program Plan

    International Nuclear Information System (INIS)

    Gustavson, R.D.

    1995-12-01

    The Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure

  14. Planning and Design: A Systems Approach.

    Science.gov (United States)

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  15. Resection planning for robotic acoustic neuroma surgery

    Science.gov (United States)

    McBrayer, Kepra L.; Wanna, George B.; Dawant, Benoit M.; Balachandran, Ramya; Labadie, Robert F.; Noble, Jack H.

    2016-03-01

    Acoustic neuroma surgery is a procedure in which a benign mass is removed from the Internal Auditory Canal (IAC). Currently this surgical procedure requires manual drilling of the temporal bone followed by exposure and removal of the acoustic neuroma. This procedure is physically and mentally taxing to the surgeon. Our group is working to develop an Acoustic Neuroma Surgery Robot (ANSR) to perform the initial drilling procedure. Planning the ANSR's drilling region using pre-operative CT requires expertise and around 35 minutes' time. We propose an approach for automatically producing a resection plan for the ANSR that would avoid damage to sensitive ear structures and require minimal editing by the surgeon. We first compute an atlas-based segmentation of the mastoid section of the temporal bone, refine it based on the position of anatomical landmarks, and apply a safety margin to the result to produce the automatic resection plan. In experiments with CTs from 9 subjects, our automated process resulted in a resection plan that was verified to be safe in every case. Approximately 2 minutes were required in each case for the surgeon to verify and edit the plan to permit functional access to the IAC. We measured a mean Dice coefficient of 0.99 and surface error of 0.08 mm between the final and automatically proposed plans. These preliminary results indicate that our approach is a viable method for resection planning for the ANSR and drastically reduces the surgeon's planning effort.

  16. A 3D computer graphics approach to brachytherapy planning.

    Science.gov (United States)

    Weichert, Frank; Wawro, Martin; Wilke, Carsten

    2004-06-01

    Intravascular brachytherapy (IVB) can significantly reduce the risk of restenosis after interventional treatment of stenotic arteries, if planned and applied correctly. In order to facilitate computer-based IVB planning, a three-dimensional reconstruction of the stenotic artery based on intravascular ultrasound (IVUS) sequences is desirable. For this purpose, the frames of the IVUS sequence are properly aligned in space, possible gaps inbetween the IVUS frames are filled by interpolation with radial basis functions known from scattered data interpolation. The alignment procedure uses additional information which is obtained from biplane X-ray angiography performed simultaneously during the capturing of the IVUS sequence. After IVUS images and biplane angiography data are acquired from the patient, the vessel-wall borders and the IVUS catheter are detected by an active contour algorithm. Next, the twist (relative orientation) between adjacent IVUS frames is determined by a sequential triangulation method. The absolute orientation of each frame is established by a stochastic analysis based on anatomical landmarks. Finally, the reconstructed 3D vessel model is visualized by methods of combined volume and polygon rendering. The reconstruction is then used for the computation of the radiation-distribution within the tissue, emitted from a beta-radiation source. All these steps are performed during the percutaneous intervention.

  17. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  18. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  19. Quantification of uncertainty in flood risk assessment for flood protection planning: a Bayesian approach

    Science.gov (United States)

    Dittes, Beatrice; Špačková, Olga; Ebrahimian, Negin; Kaiser, Maria; Rieger, Wolfgang; Disse, Markus; Straub, Daniel

    2017-04-01

    Flood risk estimates are subject to significant uncertainties, e.g. due to limited records of historic flood events, uncertainty in flood modeling, uncertain impact of climate change or uncertainty in the exposure and loss estimates. In traditional design of flood protection systems, these uncertainties are typically just accounted for implicitly, based on engineering judgment. In the AdaptRisk project, we develop a fully quantitative framework for planning of flood protection systems under current and future uncertainties using quantitative pre-posterior Bayesian decision analysis. In this contribution, we focus on the quantification of the uncertainties and study their relative influence on the flood risk estimate and on the planning of flood protection systems. The following uncertainty components are included using a Bayesian approach: 1) inherent and statistical (i.e. limited record length) uncertainty; 2) climate uncertainty that can be learned from an ensemble of GCM-RCM models; 3) estimates of climate uncertainty components not covered in 2), such as bias correction, incomplete ensemble, local specifics not captured by the GCM-RCM models; 4) uncertainty in the inundation modelling; 5) uncertainty in damage estimation. We also investigate how these uncertainties are possibly reduced in the future when new evidence - such as new climate models, observed extreme events, and socio-economic data - becomes available. Finally, we look into how this new evidence influences the risk assessment and effectivity of flood protection systems. We demonstrate our methodology for a pre-alpine catchment in southern Germany: the Mangfall catchment in Bavaria that includes the city of Rosenheim, which suffered significant losses during the 2013 flood event.

  20. Comparison of Different Approaches to the Cutting Plan Scheduling

    Directory of Open Access Journals (Sweden)

    Peter Bober

    2011-10-01

    Full Text Available Allocation of specific cutting plans and their scheduling to individual cutting machines presents a combinatorial optimization problem. In this respect, various approaches and methods are used to arrive to a viable solution. The paper reports three approaches represented by three discreet optimization methods. The first one is back-tracing algorithm and serves as a reference to verify functionality of the other two ones. The second method is optimization using genetic algorithms, and the third one presents heuristic approach to optimization based on anticipated properties of an optimal solution. Research results indicate that genetic algorithms are demanding to calculate though not dependant on the selected objective function. Heuristic algorithm is fast but dependant upon anticipated properties of the optimal solution. Hence, at change of the objective function it has to be changed. When the scheduling by genetic algorithms is solvable in a sufficiently short period of time, it is more appropriate from the practical point than the heuristic algorithm. The back-tracing algorithm usually does not provide a result in a feasible period of time.

  1. Learning Outcomes in Vocational Education: A Business Plan Development by Production-Based Learning Model Approach

    Science.gov (United States)

    Kusumaningrum, Indrati; Hidayat, Hendra; Ganefri; Anori, Sartika; Dewy, Mega Silfia

    2016-01-01

    This article describes the development of a business plan by using production-based learning approach. In addition, this development also aims to maximize learning outcomes in vocational education. Preliminary analysis of curriculum and learning and the needs of the market and society become the basic for business plan development. To produce a…

  2. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy.

    Science.gov (United States)

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-06-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1-2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85-6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins. © 2016 The Royal Australian and New Zealand College of Radiologists.

  3. Final-state interactions and superscaling in the semi-relativistic approach to quasielastic electron and neutrino scattering

    International Nuclear Information System (INIS)

    Amaro, J. E.; Barbaro, M. B.; Caballero, J. A.; Donnelly, T. W.; Udias, J. M.

    2007-01-01

    The semi-relativistic approach to electron and neutrino quasielastic scattering from nuclei is extended to include final-state interactions. Starting with the usual nonrelativistic continuum shell model, the problem is relativized by using the semi-relativistic expansion of the current in powers of the initial nucleon momentum and relativistic kinematics. Two different approaches are considered for the final-state interactions: the Smith-Wambach 2p-2h damping model and the Dirac-equation-based potential extracted from a relativistic mean-field plus the Darwin factor. Using the latter, the scaling properties of (e,e ' ) and (ν μ ,μ - ) cross sections for intermediate momentum transfers are investigated

  4. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  5. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  6. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  7. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  8. IPIP: A new approach to inverse planning for HDR brachytherapy by directly optimizing dosimetric indices

    International Nuclear Information System (INIS)

    Siauw, Timmy; Cunha, Adam; Atamtuerk, Alper; Hsu, I-Chow; Pouliot, Jean; Goldberg, Ken

    2011-01-01

    Purpose: Many planning methods for high dose rate (HDR) brachytherapy require an iterative approach. A set of computational parameters are hypothesized that will give a dose plan that meets dosimetric criteria. A dose plan is computed using these parameters, and if any dosimetric criteria are not met, the process is iterated until a suitable dose plan is found. In this way, the dose distribution is controlled by abstract parameters. The purpose of this study is to develop a new approach for HDR brachytherapy by directly optimizing the dose distribution based on dosimetric criteria. Methods: The authors developed inverse planning by integer program (IPIP), an optimization model for computing HDR brachytherapy dose plans and a fast heuristic for it. They used their heuristic to compute dose plans for 20 anonymized prostate cancer image data sets from patients previously treated at their clinic database. Dosimetry was evaluated and compared to dosimetric criteria. Results: Dose plans computed from IPIP satisfied all given dosimetric criteria for the target and healthy tissue after a single iteration. The average target coverage was 95%. The average computation time for IPIP was 30.1 s on an Intel(R) Core TM 2 Duo CPU 1.67 GHz processor with 3 Gib RAM. Conclusions: IPIP is an HDR brachytherapy planning system that directly incorporates dosimetric criteria. The authors have demonstrated that IPIP has clinically acceptable performance for the prostate cases and dosimetric criteria used in this study, in both dosimetry and runtime. Further study is required to determine if IPIP performs well for a more general group of patients and dosimetric criteria, including other cancer sites such as GYN.

  9. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    Science.gov (United States)

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  10. Engineering and planning for decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Gans, G.M. Jr.

    1982-01-01

    With the publication of NUREG-0586, ''Draft Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities'' in January, 1981 the Nuclear Regulatory Commission staff has put the industry on notice that the termination of operating licenses and the final disposal of physical facilities will require the early consideration of several options and approaches and the preparation of comprehensive engineering and planning documents for the selected option at the end of useful life. This paper opens with a discussion of the options available and the principal aspects of decommissioning. The major emphasis of the composition is the nature of documents, the general approach to be followed, and special considerations to be taken into account when performing the detailed engineering and planning for decommissioning, as the end of life approaches and actual physical disposal is imminent. The author's main point of reference is on-going work by Burns and Roe, with Nuclear Energy Services, under contract to the Department of Energy's Richland Office, to perform the engineering and planning for the decommissioning of the Shippingport Atomic Power Station in Pennsylvania

  11. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  12. Autonomous Path Planning for Road Vehicles in Narrow Environments: An Efficient Continuous Curvature Approach

    Directory of Open Access Journals (Sweden)

    Domokos Kiss

    2017-01-01

    Full Text Available In this paper we introduce a novel method for obtaining good quality paths for autonomous road vehicles (e.g., cars or buses in narrow environments. There are many traffic situations in urban scenarios where nontrivial maneuvering in narrow places is necessary. Navigating in cluttered parking lots or having to avoid obstacles blocking the way and finding a detour even in narrow streets are challenging, especially if the vehicle has large dimensions like a bus. We present a combined approximation-based approach to solve the path planning problem in such situations. Our approach consists of a global planner which generates a preliminary path consisting of straight and turning-in-place primitives and a local planner which is used to make the preliminary path feasible to car-like vehicles. The approximation methodology is well known in the literature; however, both components proposed in this paper differ from existing similar planning methods. The approximation process with the proposed local planner is proven to be convergent for any preliminary global paths. The resulting path has continuous curvature which renders our method well suited for application on real vehicles. Simulation experiments show that the proposed method outperforms similar approaches in terms of path quality in complicated planning tasks.

  13. Bottom-up approach for decentralised energy planning. Case study of Tumkur district in India

    Energy Technology Data Exchange (ETDEWEB)

    Hiremath, Rahul B. [Walchand Institute of Technology, Solapur 413006 (India); Kumar, Bimlesh [Civil Engineering, Indian Institute of Technology, Guwahati 781039 (India); Balachandra, P. [Energy Technology Innovation Policy, Belfer Center for Science and International Affairs, Harvard Kennedy School, Harvard University, Cambridge, MA 02138 (United States); Ravindranath, N.H. [CST, IISc, Bangalore 560012 (India)

    2010-02-15

    Decentralized Energy Planning (DEP) is one of the options to meet the rural and small-scale energy needs in a reliable, affordable and environmentally sustainable way. The main aspect of the energy planning at decentralized level would be to prepare an area-based DEP to meet energy needs and development of alternate energy sources at least-cost to the economy and environment. Present work uses goal-programming method in order to analyze the DEP through bottom-up approach. This approach includes planning from the lowest scale of Tumkur district in India. The scale of analysis included village level - Ungra, panchayat level (local council) - Yedavani, block level - Kunigal and district level - Tumkur. The approach adopted was bottom-up (village to district) to allow a detailed description of energy services and the resulting demand for energy forms and supply technologies. Different scenarios are considered at four decentralized scales for the year 2005 and are developed and analyzed for the year 2020. Decentralized bioenergy system for producing biogas and electricity, using local biomass resources, are shown to promote development compared to other renewables. This is because, apart from meeting energy needs, multiple goals could be achieved such as self-reliance, local employment, and land reclamation apart from CO{sub 2} emissions reduction. (author)

  14. Bottom-up approach for decentralised energy planning: Case study of Tumkur district in India

    Energy Technology Data Exchange (ETDEWEB)

    Hiremath, Rahul B., E-mail: rahulhiremath@gmail.co [Walchand Institute of Technology Solapur 413006 (India); Kumar, Bimlesh, E-mail: bimk@iitg.ernet.i [Civil Engineering, Indian Institute of Technology, Guwahati 781039 (India); Balachandra, P., E-mail: balachandra_patil@hks.harvard.ed [Energy Technology Innovation Policy, Belfer Center for Science and International Affairs, Harvard Kennedy School, Harvard University, Cambridge, MA 02138 (United States); Ravindranath, N.H., E-mail: ravi@ces.iisc.ernet.i [CST, IISc, Bangalore 560012 (India)

    2010-02-15

    Decentralized Energy Planning (DEP) is one of the options to meet the rural and small-scale energy needs in a reliable, affordable and environmentally sustainable way. The main aspect of the energy planning at decentralized level would be to prepare an area-based DEP to meet energy needs and development of alternate energy sources at least-cost to the economy and environment. Present work uses goal-programming method in order to analyze the DEP through bottom-up approach. This approach includes planning from the lowest scale of Tumkur district in India. The scale of analysis included village level-Ungra, panchayat level (local council)-Yedavani, block level-Kunigal and district level-Tumkur. The approach adopted was bottom-up (village to district) to allow a detailed description of energy services and the resulting demand for energy forms and supply technologies. Different scenarios are considered at four decentralized scales for the year 2005 and are developed and analyzed for the year 2020. Decentralized bioenergy system for producing biogas and electricity, using local biomass resources, are shown to promote development compared to other renewables. This is because, apart from meeting energy needs, multiple goals could be achieved such as self-reliance, local employment, and land reclamation apart from CO{sub 2} emissions reduction.

  15. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  16. Single string planning problem arising in liner shipping industries: A heuristic approach

    DEFF Research Database (Denmark)

    Gelareh, Shahin; Neamatian Monemi, Rahimeh; Mahey, Philippe

    2013-01-01

    We propose an efficient heuristic approach for solving instances of the Single String Planning Problem (SSPP) arising in the liner shipping industry. In the SSPP a Liner Service Provider (LSP) only revises one of its many operational strings, and it is assumed that the other strings are unchangea...

  17. Planning Approach to Organisational and Methodical Provision of Formation and Functioning of Logistic Systems of Enterprises

    Directory of Open Access Journals (Sweden)

    Kolodizyeva Tetyana O.

    2013-12-01

    Full Text Available The article analyses factors of external and internal environment of enterprises that influence the process of formation of logistic systems and justifies expediency of use of the planning approach to development of the organisational and methodical provision of functioning of logistic systems of enterprises. The article offers to conduct development of organisational and methodical provision of formation of functioning of logistic systems with the use of not one but several methodological approaches: situational, process, functional and planning. The conducted analysis allowed composing a basic project, which could be laid in the foundation of formation of a logistic system by any enterprise for meeting requirements of the planning triangle: content / borders, time, cost, taking into consideration the forth limitation – quality.

  18. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    Science.gov (United States)

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  19. Agency procedures for the NRC incident response plan. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    The NRC Incident Response Plan, NUREG-0728/MC 0502 describes the functions of the NRC during an incident and the kinds of actions that comprise an NRC response. The NRC response plan will be activated in accordance with threshold criteria described in the plan for incidents occurring at nuclear reactors and fuel facilities involving materials licensees; during transportation of licensed material, and for threats against facilities or licensed material. In contrast to the general overview provided by the Plan, the purpose of these agency procedures is to delineate the manner in which each planned response function is performed; the criteria for making those response decisions which can be preplanned; and the information and other resources needed during a response. An inexperienced but qualified person should be able to perform functions assigned by the Plan and make necessary decisions, given the specified information, by becoming familiar with these procedures. This rule of thumb has been used to determine the amount of detail in which the agency procedures are described. These procedures form a foundation for the training of response personnel both in their normal working environment and during planned emergency exercises. These procedures also form a ready reference or reminder checklist for technical team members and managers during a response

  20. Integrated Food and Nutrition Security Programming to Address Undernutrition : The Plan Approach

    NARCIS (Netherlands)

    Boer, de F.A.; Verdonk, I.

    2012-01-01

    From a technical point of view, it is widely recognised that an integrated approach to food and nutrition security is an effective way to promote child nutritional well-being. In this desk review, based on project documents of the countries which took part in the PLAN NL supported Food and Nutrition

  1. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    Science.gov (United States)

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  2. Innovative approaches to inertial confinement fusion reactors: Final report

    International Nuclear Information System (INIS)

    Bourque, R.F.; Schultz, K.R.

    1986-11-01

    Three areas of innovative approaches to inertial confinement fusion (ICF) reactor design are given. First, issues pertaining to the Cascade reactor concept are discussed. Then, several innovative concepts are presented which attempt to directly recover the blast energy from a fusion target. Finally, the Turbostar concept for direct recovery of that energy is evaluated. The Cascade issues discussed are combustion of the carbon granules in the event of air ingress, the use of alternate granule materials, and the effect of changes in carbon flow on details of the heat exchanger. Carbon combustion turns out to be a minor problem. Four ICF innovative concepts were considered: a turbine with ablating surfaces, a liquid piston system, a wave generator, and a resonating pump. In the final analysis, none show any real promise. The Turbostar concept of direct recovery is a very interesting idea and appeared technically viable. However, it shows no efficiency gain or any decrease in capital cost compared to reactors with conventional thermal conversion systems. Attempts to improve it by placing a close-in lithium sphere around the target to increase gas generation increased efficiency only slightly. It is concluded that these direct conversion techniques require thermalization of the x-ray and debris energy, and are Carnot limited. They therefore offer no advantage over existing and proposed methods of thermal energy conversion or direct electrical conversion

  3. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  4. Burrell, Pennsylvania, vicinty property Long-Term Surveillance Plan. Final report

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to establish elements of the US Department of Energy (DOE) Long-Term Surveillance Plan (LTSP) for the Burrell, Pennsylvania, vicinity property. The US Nuclear Regulatory Commission (NRC) will use this plan to support the issuance of a license for the long-term surveillance and maintenance of the Burrell vicinity property. The DOE and the NRC previously reached agreement regarding the issuance of a license for the Burrell vicinity property. This is a departure from the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, which requires the licensing only of disposal sites, not vicinity properties. However, given the unusually large volume of wastes and the distance from the Canonsburg disposal cell of the Burrell vicinity property, it was agreed that a license for a designed disposal cell with surveillance requirements constituted a reasonable and prudent approach in keeping with the spirit of UMTRCA. The Burrell vicinity property covers approximately 29 hectares (72 acres). Disposal of the 10,500 tonnes (I 1,600 tons) of residual radioactive material (RRM) removed from the Canonsburg Uranium Mill Tailings Remedial Action (UMTRA) Project site took place within an approximately 0.6-hectare (1.6-acre) section in the western portion and an approximately 0.6-hectare (1.6-acre) section in the eastern portion of the Burrell vicinity property. The RRM was brought in as fill for under the ConRail railroad tracks. The excess RRM was placed in a storage location adjacent to the Conemaugh River at Burrell, which was later added to the disposal area. The disposal area contains a total of 78,000 tonnes (86,000 tons) of RRM

  5. QUALITY ENHANCEMENT IN MAINTENANCE PLANNING THROUGH NON-IDENTICAL FMECA APPROACHES

    Directory of Open Access Journals (Sweden)

    Nilesh Pancholi

    2017-09-01

    Full Text Available The purpose of this paper is to investigate the scope of reliability improvement of aluminium wire rolling mill. This paper addresses the performance reliability of continuous process industry of interest to many applications in maintenance planning where multi-attribute decision making (MADM approaches are very useful. The paper addresses the process of discriminating critical components through substantial shop-floor failure data. The research work narrates a method for evaluating risk priority number (RPN traditionally. Moreover, the maintainability criticality index (MCI for each failure cause of identified critical components is evaluated through two disparate MADM failure models: technique for order preference by similarity to ideal solution (TOPSIS and preference section index (PSI to overcome the limitations of more traditional approaches. The primary findings of this research work are to enhance quality in planning the maintenance activities of critical components of targeted process industry through traditional as well as non-traditional failure analysis models. The research work is focused on potential failure causes of critical components like; bearings, gears, and shafts of aluminium wire rolling mill which are commonly representing the most critical components in a large range of industrial processes including aluminium wires. The proposed work will illustrate the working lives of components and associated failures. It will help to elucidate maintenance issues of major process industries and recommended deliverable keys.

  6. Social Justice, Children's Needs and Rights: An Approach to Planning

    Science.gov (United States)

    Sims, Margaret

    2015-01-01

    Commonly, planning for children involves comparing what they know against a curriculum or learning framework which identifies what they should know. Early childhood educators are then expected to create learning opportunities to help fill the gap between these two extremes. In this paper I argue that such an approach does not honour the…

  7. Multi-criteria approach for strategic planning of reverse supply chain

    Directory of Open Access Journals (Sweden)

    Abdelkader Benzohra

    2017-04-01

    Full Text Available A reverse supply chain is viewed as a process from consumption point to recovery point and the management of domestic waste is considered as a specific and complex reverse supply chain. This important sector represents a high challenging problem for our cities, constrained by financial, social, health and environmental considerations. This paper proposes multicriteria decision aid to help choose an efficient domestic waste management strategy. In fact, Multicriteria decision making techniques are considered as a key option to solve this type of problems, giving a solution that represents a good compromise between different preferences. The adopted approach consists in outranking a set of candidate management plans using a method based on partial aggregation criteria. This model is applied on a real case study of an Algerian city and to validate the obtained results, a deep sensitivity analysis is carried out, giving the most appropriate plans.

  8. Process planning optimization on turning machine tool using a hybrid genetic algorithm with local search approach

    Directory of Open Access Journals (Sweden)

    Yuliang Su

    2015-04-01

    Full Text Available A turning machine tool is a kind of new type of machine tool that is equipped with more than one spindle and turret. The distinctive simultaneous and parallel processing abilities of turning machine tool increase the complexity of process planning. The operations would not only be sequenced and satisfy precedence constraints, but also should be scheduled with multiple objectives such as minimizing machining cost, maximizing utilization of turning machine tool, and so on. To solve this problem, a hybrid genetic algorithm was proposed to generate optimal process plans based on a mixed 0-1 integer programming model. An operation precedence graph is used to represent precedence constraints and help generate a feasible initial population of hybrid genetic algorithm. Encoding strategy based on data structure was developed to represent process plans digitally in order to form the solution space. In addition, a local search approach for optimizing the assignments of available turrets would be added to incorporate scheduling with process planning. A real-world case is used to prove that the proposed approach could avoid infeasible solutions and effectively generate a global optimal process plan.

  9. Challenges and Approaches in River Delta Planning - Annexes to report on training workshop

    NARCIS (Netherlands)

    Wosten, J.H.M.; Douven, W.; Long Phi, H.; Fida Abdullah Khan, M.

    2012-01-01

    Programme, participants and all powerpoint presentations of the Delta Alliance Training Workshop: Challenges and approaches in river delta planning, sharing experiences from SE Asian Deltas and the Rhine-Meuse Delta. 22-26 October 2012, WACC, Vietnam National University, Ho Chi Minh City, Vietnam

  10. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    Science.gov (United States)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  11. A simulated annealing approach to supplier selection aware inventory planning

    OpenAIRE

    Turk, Seda; Miller, Simon; Özcan, Ender; John, Robert

    2015-01-01

    Selection of an appropriate supplier is a crucial and challenging task in the effective management of a supply chain. Also, appropriate inventory management is critical to the success of a supply chain operation. In recent years, there has been a growing interest in the area of selection of an appropriate vendor and creating good inventory planning using supplier selection information. In this paper, we consider both of these tasks in a two-stage approach employing Interval Type-2 Fuzzy Sets ...

  12. Rebranding city: A strategic urban planning approach in Indonesia

    Science.gov (United States)

    Firzal, Yohannes

    2018-03-01

    Concomitant with entering the decentralization period has had a significant effect on cities in Indonesia, and is seen as a new era for local life. The decentralization period has also generated sentiments which are locally bounded that can be identified in the discretion given to the local government in charge to rebranding the city. In this paper, the rebranding phenomena have learned from Pekanbaru city where has changed its city brand for few times. By using a qualitative research approach and combining multi methods to collect and process the data, this paper investigates that the rebranding city has found as a strategic approach in urban planning today that is used to inject more senses to the city and its local life by the local government. This research has confirmed, for almost two decades of the decentralization period, the rebranding phenomena are not only found to generate sense locally, but also as a power marker of the local regime.

  13. Optimal planning of multiple distributed generation sources in distribution networks: A new approach

    Energy Technology Data Exchange (ETDEWEB)

    AlRashidi, M.R., E-mail: malrash2002@yahoo.com [Department of Electrical Engineering, College of Technological Studies, Public Authority for Applied Education and Training (PAAET) (Kuwait); AlHajri, M.F., E-mail: mfalhajri@yahoo.com [Department of Electrical Engineering, College of Technological Studies, Public Authority for Applied Education and Training (PAAET) (Kuwait)

    2011-10-15

    Highlights: {yields} A new hybrid PSO for optimal DGs placement and sizing. {yields} Statistical analysis to fine tune PSO parameters. {yields} Novel constraint handling mechanism to handle different constraints types. - Abstract: An improved particle swarm optimization algorithm (PSO) is presented for optimal planning of multiple distributed generation sources (DG). This problem can be divided into two sub-problems: the DG optimal size (continuous optimization) and location (discrete optimization) to minimize real power losses. The proposed approach addresses the two sub-problems simultaneously using an enhanced PSO algorithm capable of handling multiple DG planning in a single run. A design of experiment is used to fine tune the proposed approach via proper analysis of PSO parameters interaction. The proposed algorithm treats the problem constraints differently by adopting a radial power flow algorithm to satisfy the equality constraints, i.e. power flows in distribution networks, while the inequality constraints are handled by making use of some of the PSO features. The proposed algorithm was tested on the practical 69-bus power distribution system. Different test cases were considered to validate the proposed approach consistency in detecting optimal or near optimal solution. Results are compared with those of Sequential Quadratic Programming.

  14. Optimal planning of multiple distributed generation sources in distribution networks: A new approach

    International Nuclear Information System (INIS)

    AlRashidi, M.R.; AlHajri, M.F.

    2011-01-01

    Highlights: → A new hybrid PSO for optimal DGs placement and sizing. → Statistical analysis to fine tune PSO parameters. → Novel constraint handling mechanism to handle different constraints types. - Abstract: An improved particle swarm optimization algorithm (PSO) is presented for optimal planning of multiple distributed generation sources (DG). This problem can be divided into two sub-problems: the DG optimal size (continuous optimization) and location (discrete optimization) to minimize real power losses. The proposed approach addresses the two sub-problems simultaneously using an enhanced PSO algorithm capable of handling multiple DG planning in a single run. A design of experiment is used to fine tune the proposed approach via proper analysis of PSO parameters interaction. The proposed algorithm treats the problem constraints differently by adopting a radial power flow algorithm to satisfy the equality constraints, i.e. power flows in distribution networks, while the inequality constraints are handled by making use of some of the PSO features. The proposed algorithm was tested on the practical 69-bus power distribution system. Different test cases were considered to validate the proposed approach consistency in detecting optimal or near optimal solution. Results are compared with those of Sequential Quadratic Programming.

  15. Stakeholder perceptions of a total market approach to family planning in Nicaragua.

    Science.gov (United States)

    Drake, Jennifer Kidwell; Espinoza, Henry; Suraratdecha, Chutima; Lacayo, Yann; Keith, Bonnie M; Vail, Janet G

    2011-05-01

    To assess private-sector stakeholders' and donors' perceptions of a total market approach (TMA) to family planning in Nicaragua in the context of decreased funding; to build evidence for potential strategies and mechanisms for TMA implementation (including public-private partnerships (PPPs)); and to identify information gaps and future priorities for related research and advocacy. A descriptive exploratory study was conducted in various locations in Nicaragua from March to April 2010. A total of 24 key private-sector stakeholders and donors were interviewed and their responses analyzed using two questionnaires and a stakeholder analysis tool (PolicyMakerTM software). All survey participants supported a TMA, and public-private collaboration, in family planning in Nicaragua. Based on the survey responses, opportunities for further developing PPPs for family planning include building on and expanding existing governmental frameworks, such as Nicaragua's current coordination mechanism for contraceptive security. Obstacles include the lack of ongoing government engagement with the commercial (for-profit) sector and confusion about regulations for its involvement in family planning. Strategies for strengthening existing PPPs include establishing a coordination mechanism specifically for the commercial sector and collecting and disseminating evidence supporting public-private collaboration in family planning. There was no formal or absolute opposition to a TMA or PPPs in family planning in Nicaragua among a group of diverse nongovernmental stakeholders and donors. This type of study can help identify strategies to mobilize existing and potential advocates in achieving articulated policy goals, including diversification of funding sources for family planning to achieve contraceptive security.

  16. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  17. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  18. SU-E-T-539: Fixed Versus Variable Optimization Points in Combined-Mode Modulated Arc Therapy Planning

    International Nuclear Information System (INIS)

    Kainz, K; Prah, D; Ahunbay, E; Li, X

    2014-01-01

    Purpose: A novel modulated arc therapy technique, mARC, enables superposition of step-and-shoot IMRT segments upon a subset of the optimization points (OPs) of a continuous-arc delivery. We compare two approaches to mARC planning: one with the number of OPs fixed throughout optimization, and another where the planning system determines the number of OPs in the final plan, subject to an upper limit defined at the outset. Methods: Fixed-OP mARC planning was performed for representative cases using Panther v. 5.01 (Prowess, Inc.), while variable-OP mARC planning used Monaco v. 5.00 (Elekta, Inc.). All Monaco planning used an upper limit of 91 OPs; those OPs with minimal MU were removed during optimization. Plans were delivered, and delivery times recorded, on a Siemens Artiste accelerator using a flat 6MV beam with 300 MU/min rate. Dose distributions measured using ArcCheck (Sun Nuclear Corporation, Inc.) were compared with the plan calculation; the two were deemed consistent if they agreed to within 3.5% in absolute dose and 3.5 mm in distance-to-agreement among > 95% of the diodes within the direct beam. Results: Example cases included a prostate and a head-and-neck planned with a single arc and fraction doses of 1.8 and 2.0 Gy, respectively. Aside from slightly more uniform target dose for the variable-OP plans, the DVHs for the two techniques were similar. For the fixed-OP technique, the number of OPs was 38 and 39, and the delivery time was 228 and 259 seconds, respectively, for the prostate and head-and-neck cases. For the final variable-OP plans, there were 91 and 85 OPs, and the delivery time was 296 and 440 seconds, correspondingly longer than for fixed-OP. Conclusion: For mARC, both the fixed-OP and variable-OP approaches produced comparable-quality plans whose delivery was successfully verified. To keep delivery time per fraction short, a fixed-OP planning approach is preferred

  19. SU-E-T-539: Fixed Versus Variable Optimization Points in Combined-Mode Modulated Arc Therapy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Kainz, K; Prah, D; Ahunbay, E; Li, X [Medical College of Wisconsin, Milwaukee, WI (United States)

    2014-06-01

    Purpose: A novel modulated arc therapy technique, mARC, enables superposition of step-and-shoot IMRT segments upon a subset of the optimization points (OPs) of a continuous-arc delivery. We compare two approaches to mARC planning: one with the number of OPs fixed throughout optimization, and another where the planning system determines the number of OPs in the final plan, subject to an upper limit defined at the outset. Methods: Fixed-OP mARC planning was performed for representative cases using Panther v. 5.01 (Prowess, Inc.), while variable-OP mARC planning used Monaco v. 5.00 (Elekta, Inc.). All Monaco planning used an upper limit of 91 OPs; those OPs with minimal MU were removed during optimization. Plans were delivered, and delivery times recorded, on a Siemens Artiste accelerator using a flat 6MV beam with 300 MU/min rate. Dose distributions measured using ArcCheck (Sun Nuclear Corporation, Inc.) were compared with the plan calculation; the two were deemed consistent if they agreed to within 3.5% in absolute dose and 3.5 mm in distance-to-agreement among > 95% of the diodes within the direct beam. Results: Example cases included a prostate and a head-and-neck planned with a single arc and fraction doses of 1.8 and 2.0 Gy, respectively. Aside from slightly more uniform target dose for the variable-OP plans, the DVHs for the two techniques were similar. For the fixed-OP technique, the number of OPs was 38 and 39, and the delivery time was 228 and 259 seconds, respectively, for the prostate and head-and-neck cases. For the final variable-OP plans, there were 91 and 85 OPs, and the delivery time was 296 and 440 seconds, correspondingly longer than for fixed-OP. Conclusion: For mARC, both the fixed-OP and variable-OP approaches produced comparable-quality plans whose delivery was successfully verified. To keep delivery time per fraction short, a fixed-OP planning approach is preferred.

  20. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  1. A novel approach for multiple mobile objects path planning: Parametrization method and conflict resolution strategy

    International Nuclear Information System (INIS)

    Ma, Yong; Wang, Hongwei; Zamirian, M.

    2012-01-01

    We present a new approach containing two steps to determine conflict-free paths for mobile objects in two and three dimensions with moving obstacles. Firstly, the shortest path of each object is set as goal function which is subject to collision-avoidance criterion, path smoothness, and velocity and acceleration constraints. This problem is formulated as calculus of variation problem (CVP). Using parametrization method, CVP is converted to time-varying nonlinear programming problems (TNLPP) and then resolved. Secondly, move sequence of object is assigned by priority scheme; conflicts are resolved by multilevel conflict resolution strategy. Approach efficiency is confirmed by numerical examples. -- Highlights: ► Approach with parametrization method and conflict resolution strategy is proposed. ► Approach fits for multi-object paths planning in two and three dimensions. ► Single object path planning and multi-object conflict resolution are orderly used. ► Path of each object obtained with parameterization method in the first phase. ► Conflict-free paths gained by multi-object conflict resolution in the second phase.

  2. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  3. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  4. On e-business strategy planning and performance evaluation: An adaptive algorithmic managerial approach

    Directory of Open Access Journals (Sweden)

    Alexandra Lipitakis

    2017-07-01

    Full Text Available A new e-business strategy planning and performance evaluation scheme based on adaptive algorithmic modelling techniques is presented. The effect of financial and non-financial performance of organizations on e-business strategy planning is investigated. The relationships between the four strategic planning parameters are examined, the directions of these relationships are given and six additional basic components are also considered. The new conceptual model has been constructed for e-business strategic planning and performance evaluation and an adaptive algorithmic modelling approach is presented. The new adaptive algorithmic modelling scheme including eleven dynamic modules, can be optimized and used effectively in e-business strategic planning and strategic planning evaluation of various e-services in very large organizations and businesses. A synoptic statistical analysis and comparative numerical results for the case of UK and Greece are given. The proposed e-business models indicate how e-business strategic planning may affect financial and non-financial performance in business and organizations by exploring whether models which are used for strategy planning can be applied to e-business planning and whether these models would be valid in different environments. A conceptual model has been constructed and qualitative research methods have been used for testing a predetermined number of considered hypotheses. The proposed models have been tested in the UK and Greece and the conclusions including numerical results and statistical analyses indicated existing relationships between considered dependent and independent variables. The proposed e-business models are expected to contribute to e-business strategy planning of businesses and organizations and managers should consider applying these models to their e-business strategy planning to improve their companies’ performances. This research study brings together elements of e

  5. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  6. MO-G-201-01: A Multi-Institutional Study Investigating the Performance of a Knowledge-Based Planning System Against Pinnacle Auto-Planning Engine in SIB-IMRT for the Head-And-Neck Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Wu, B; Pang, D [Georgetown University Hospital, Washington, DC (United States); Kusters, M; Kunze-busch, M; Dijkema, T [Radboud University Medical Center, Nijmegen (Netherlands); McNutt, T [Johns Hopkins University, Baltimore, MD (United States); Sanguineti, G [Istituto Nazionale Tumori Regina Elena, Roma (Italy)

    2016-06-15

    Purpose: Knowledge-based Planning (KBP) founded on prior planning experience and Auto-Planning Engine (APE; commercialized in Pinnacle v9.10 TPS) based on progressive optimization algorithm both aim to eliminate the trial-and-error process in radiotherapy inverse planning. This study investigates the performance of the approaches in a multi-institutional setting to evaluate their functionalities in oropharyngeal cancer and offers suggestions how they can be implemented in the clinic. Methods: Radboud University Medical Center (RUMC) provided 35 oropharyngeal cancer patients (SIB-IMRT with two-dose-level prescription: 68 Gy to PTV68 and 50.3 Gy to PTV50.3) with corresponding comparative APE plans. Johns Hopkins University (JHU) contributed to a three-dose-level (70 Gy 63 Gy and 58.1 Gy) plan library for RUMC’s patient KBP generation. MedStar Georgetown University Hospital (MGUH) contributed to a KBP approach employing overlap-volume histogram (OVH-KBP) for generating RUMC’s patient KBP plans using JHU’s plan library. Since both approaches need their own user-defined parameters as initial inputs the first 10 patients were set aside as training set to finalize them. Meanwhile cross-institutional comparisons and adjustments were implemented for investigating institutions’ protocol discrepancies and the approaches’ user-defined parameters were updated accordingly. The finalized parameters were then applied to the remaining 25 patients for OVH-KBP and APE generation. A Wilcoxon rank-sum test was used for statistical comparison with significance level of p<0.05. Results: On average PTV68’s V95 was 96.5% in APE plans vs. 97% in OVH-KBP plans (p=0.36); PTV50.3’s V95 in APE plans was 97.8% vs.97.6% in OVH-KBP plans (p=0.6); cord’s D0.1 cc was 38.6 Gy in OVH-KBP plans vs. 43.7 Gy in APE plans (p=0.0001); mean doses to larynxes oral cavities parotids and submandibular glands were similar with p>0.2. Conclusions: The study demonstrates that KBP and APE can

  7. Community based distribution agents’ approach to provision of family planning information and services in five Nigerian States: A mirage or a reality?

    Directory of Open Access Journals (Sweden)

    Mojisola Fayemi

    2011-11-01

    Full Text Available Background: Reducing maternal mortality in Nigeria has received continuous attention both nationally and internationally. Objectives: This article highlights the outcome of an intervention which sought to address maternal mortality reduction through increasing contraceptive uptake in 10 rural local government areas (LGAsin five Nigerian states. Method: The community based distribution (CBD approach was used in the implementation of a three year intervention that targeted 10 LGAs. Two hundred and fifty community members were trained as community based distribution agents (CBDA to provide information on reproductive health, provide non-prescriptive family planning (FP commodities, treat minor aliment and make referrals to primary health centres within the communities. Results: Final evaluation revealed an increase in the proportion of community members who had utilised FP commodities at all, from 28% at baseline to 49%, and an increase in the proportion of current contraceptive users from 16% at baseline to 37%. An average of 50% increase in clientele patronage was also observed in the 10 LGAs’ primary health care centres. Most (96% of the interviewed CBDA agents reported that a drug-revolving system was in place to ensure that drugs and commodities were available. On-the-spot assessment of the service forms revealed that 86% of them had their activities regularly recorded in their worksheets. Some of the challenges faced by CBDA were discrimination and misconception of community members about family planning (38%, inadequate financial support (14%,and transportation problems (8%. Conclusion: This study has demonstrated that the CBD approach played a critical role in enhancing access to Reproductive Health and Family Planning information and services in the project communities.

  8. Document status for 1 and 2 Kozloduy NPP decommissioning activities -Phase 'Final Shutdown'

    International Nuclear Information System (INIS)

    Vangev, A.; Boyadjiev, Z.

    1997-01-01

    Decommissioning process (D and D) is the final phase of each nuclear reactor life cycle. The first nuclear reactor generation has reached his expiration life date. Decommissioning working documentation had not been taken into account at the project and construction stage. The decommissioning activities, planning and legislation has to develop along their operation. Most of developed nuclear energetic countries have gathered good experience and have create their own decommissioning strategy. This report represents in brief an overview of different country's approaches and the Kozloduy NPP decommissioning activity intention in near future and reviews the D and D working document status for 1 and 2 Kozloduy NPP Units decommissioning. Kozloduy NPP D and D task to the moment is to plan the first stage of the decommissioning process - 'The Final Shutdown' and to prepare the working documents for the phase execution. The Final Shutdown of Kozloduy NPP - 1 is the termination of operation of the Units 1 and 2 and the electricity production cessation after their useful life exhaust. In accordance with the legal legislation in Bulgaria only the normal planned termination of operation on units 1 and 2 should be prescribed. The project results concern the initial condition of the equipment and systems, their preparation and sequence for defueling, decontamination and dismantling. A plan for activities' organization for D and D and Complex Characterization of the Site under consideration will contain the following documents: 1. Time-schedule for the sequence of activities during the stages of the Final Shutdown and Safe Enclosure preparation. Technical project for organization of work related to Final Shutdown; 2. Complex Characterization Programme for a condition investigation of the Units 1 and 2 equipment and systems. 3. Technical project for design modifications and dismantling of equipment and systems which violate the radiation and nuclear safety during the Final Shutdown

  9. Nuclear emergency response planning based on participatory decision analytic approaches

    International Nuclear Information System (INIS)

    Sinkko, K.

    2004-10-01

    This work was undertaken in order to develop methods and techniques for evaluating systematically and comprehensively protective action strategies in the case of a nuclear or radiation emergency. This was done in a way that the concerns and issues of all key players related to decisions on protective actions could be aggregated into decision- making transparently and in an equal manner. An approach called facilitated workshop, based on the theory of Decision Analysis, was tailored and tested in the planning of actions to be taken. The work builds on case studies in which it was assumed that a hypothetical accident in a nuclear power plant had led to a release of considerable amounts of radionuclides and therefore different types of protective actions should be considered. Altogether six workshops were organised in which all key players were represented, i.e., the authorities, expert organisations, industry and agricultural producers. The participants were those responsible for preparing advice or presenting matters for those responsible for the formal decision-making. Many preparatory meetings were held with various experts to prepare information for the workshops. It was considered essential that the set-up strictly follow the decision- making process to which the key players are accustomed. Key players or stakeholders comprise responsible administrators and organisations, politicians as well as representatives of the citizens affected and other persons who will and are likely to take part in decision-making in nuclear emergencies. The realistic nature and the disciplined process of a facilitated workshop and commitment to decision-making yielded up insight in many radiation protection issues. The objectives and attributes which are considered in a decision on protective actions were discussed in many occasions and were defined for different accident scenario to come. In the workshops intervention levels were derived according justification and optimisation

  10. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  11. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  12. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  13. NEW APPROACH TO TERRITORIAL PLANNING IN UKRAINE TAKING INTO ACCOUNT PROCESSE OF DECENTRALIZATIONAND AUSTRIAS EXPERIENCE

    Directory of Open Access Journals (Sweden)

    Dorosh A.M

    2016-08-01

    and goals of development without a clear spatial reference (so-called vision of future is developed. Based on this concept a plan for targeted purposes is developed.It clearly defines the boundaries of land parcelswith appropriate purpose. The next step is to make a plan of development for areas that are designated for residential, public or industrial building.This plan put restrictions and requirements for newbuildings,namely for their superficiality, compactness, density and possible use. Like the planning hierarchy, there is also a hierarchy of planning and cartographic materials of all planning levels. During the process of comparing the approaches to spatial planning in Austria and spatial planning in Ukraine was found that the spatial planning system of Ukraine requires conceptual changes. Therefore, it is proposed to upgrade the system of spatial planning to a hierarchical system, to refuse from separation of urbanplanning and spatial planning and land management and to update the tolls of this process at the local level (at the level of local communities. It is proposed instead of the Master Plan of settlement, which in the present conditions of land relations reforming is not able to ensure the effective planning processes to implement a plan for target purposes and restrictions for the entire community and to develop on this basis detailed plans for areas designated for built up. This approach will provide a unified system of spatial planning for the successful development of both urban and rural communities.

  14. Land use planning for forest catchment of Arasbaran

    International Nuclear Information System (INIS)

    Dehdar Dargahi, M.; Makhdoum, M.F.

    2001-01-01

    In this study, land use planning for six hydrological units (296690 ha) of Arasbaran forest catchment (N W of Iran in Azerbaijan) has been conducted. The main objectives of the plan were to promote sustainable use, to increase living conditions, and enhance environmental conservation in the region. First, ecological and socio-economic resources were surveyed and mapped (scale 1:50000). Then data analysis and integration with system analysis approach were performed. As a result, 3556 micro-ecosystems were mapped. Ecological capability of mapping unit (MU) was evaluated for: agriculture, range management, forestry, eco tourism and conservation with the aid of specified ecological models. Finally with coordination of socioeconomic data and ecological capability of MU, priority of land uses with qualitative-analogous method was established. At the end, map of land use planning for six hydrological units was depicted for management purposes. The results show that %5.38 of allocated land use is suitable for irrigation farming, %1.32 for dry farming, %17.43 for range management, %15.17 for protected forestry, %2.13 for forest plantation, %28.47 for extensive eco tourism, %0.01 for intensive eco tourism and finally %30.09 for conservation

  15. Planning a multilevel intervention to prevent hearing loss among farmworkers and managers: a systematic approach.

    Science.gov (United States)

    Fernandez, M E; Bartholomew, L K; Alterman, T

    2009-01-01

    Noise-induced hearing loss (NIHL) is the second most prevalent self-reported occupational illness or injury in the U.S., and agricultural workers experience high rates of hearing loss. This article uses Intervention Mapping (IM), a systematic approach to intervention development, to make recommendations for a program to improve hearing loss protection among farmworkers and managers. Final recommendations, based on previous work in the literature on hearing loss prevention, qualitative formative research, and theoretical considerations, include a specification of a multilevel theory- and evidence-based hearing protection program for farmworkers and farm managers. Twelve performance objectives (e.g., "monitor hearing and hearing loss with regular hearing testing") are specified and crossed with six relevant determinants (knowledge and behavioral capability; perceived exposure and susceptibility and noise annoyance; outcome expectations; barriers; social influence; skills and self-efficacy) to create a highly detailed matrix of change objectives for farmworkers and for their managers. These change objectives are then grouped into five categories: two for both farmworkers and their managers (noticing exposures, taking action) and three only for the latter (surveying and planning, implementation and evaluation, and communication). Theoretical methods and practical strategies, including program materials and activities, are then delineated.

  16. Integrating climate change into the transportation planning process : final report

    Science.gov (United States)

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  17. An Economic Evaluation on Replacement Plan for Aged Thermal Power Plants through a Real Option Approach

    Science.gov (United States)

    Kato, Moritoshi; Zhou, Yicheng

    This paper presents a novel method to evaluate replacement plan for aged thermal power plants under uncertain circumstances through a real option approach. The most economical plan is selected among the three options: an option to operate an existing oil-fired thermal plant, an option to mothball it, and an option to abandon it and to construct an advanced gas combined cycle power plant (ACC) at the same time. Basic ideas of our model are: we use quadranomial approach in order to evaluate an option value consisted by two different uncertain assets; we consider cash flow with a dividend in order to reflect conditions of an aged oil-fired thermal plant and use the sequential compound option approach; we evaluate replacement time using quadranomial decision tree taking into account the options. We also analyze value and time of replacement using numerical examples. Our proposed method will be practically used for generation planning. For example it is possible to make priority quantitatively in replacements of aged thermal power plants by real option values. The target year of replacement may be set as a year when cumulative probability of replacement becomes over certain level.

  18. Optimal planning approaches with multiple impulses for rendezvous based on hybrid genetic algorithm and control method

    Directory of Open Access Journals (Sweden)

    JingRui Zhang

    2015-03-01

    Full Text Available In this article, we focus on safe and effective completion of a rendezvous and docking task by looking at planning approaches and control with fuel-optimal rendezvous for a target spacecraft running on a near-circular reference orbit. A variety of existent practical path constraints are considered, including the constraints of field of view, impulses, and passive safety. A rendezvous approach is calculated by using a hybrid genetic algorithm with those constraints. Furthermore, a control method of trajectory tracking is adopted to overcome the external disturbances. Based on Clohessy–Wiltshire equations, we first construct the mathematical model of optimal planning approaches of multiple impulses with path constraints. Second, we introduce the principle of hybrid genetic algorithm with both stronger global searching ability and local searching ability. We additionally explain the application of this algorithm in the problem of trajectory planning. Then, we give three-impulse simulation examples to acquire an optimal rendezvous trajectory with the path constraints presented in this article. The effectiveness and applicability of the tracking control method are verified with the optimal trajectory above as control objective through the numerical simulation.

  19. The technical approach: The IAEA action plan on the safety of radiation sources

    International Nuclear Information System (INIS)

    Bilbao, A.; Wrixon, A.; Ortiz-Lopez, P.

    2001-01-01

    As part of the measures to strengthen international co-operation in nuclear, radiation and waste safety, the report refers to the implementation of the Action Plan for the Safety of Radiation Sources and the Security of Radioactive Materials. Starting with background information, the report references the main results of the Dijon Conference and of General Conference resolution GC(42)/RES/12 in September 1998, describing the actions taken by the Secretariat pursuant such resolution and also by the Board of Governors, in its sessions of March and September 1999, as well as by the General Conference, in October 1999 when by resolution GC(43)/RES/10 the Action Plan was endorsed and the Secretariat was urged to implement it. Finally, the report provides information on the status of implementation of the seven areas covered by the Action Plan and on the suggested further actions to be carried out for its implementation taking into account the decisions of the Board in its meeting of 11 September 2000 and the resolutions GC(44)/RES/11, GC(44)/RES/13 and GC(44)/RES/16 of the forty-fourth regular session of the General Conference. (author)

  20. CHP plant Legionowo Poland - Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-12-01

    In 1997, a new Energy Law was passed in Poland. An important element of the law is that local energy planning is made obligatory. The law describes obligatory tasks and procedures for Polish municipalities related to planning and organisation of the energy sector. With the objective of supporting the Polish municipalities in their obligations according to the energy law of 1997, the project 'Energy Planning in Poland at Municipal Level - Support to Decision Makers' was launched. As part of the project, Municipal Guideline Reports have been elaborated for three model municipalities. These guidelines present the basis for the Energy Supply Plans in these municipalities. For the city of Legionowo, the following was recommended: 1. The planning processes initiated during the project should be continues/followed up, 2. Master Plan for the district heating system should be prepared, 3. The possibilities of establishment of a major natural gas-fired CHP plant of the Combined Cycle type should be investigated. The present report is the final Master Plan based on the following reports: Master Plan for Legionowo - Status Report; Master Plan for Legionowo - Hydraulic Analysis; CHP Plant Legionowo Poland - CHP Feasibility Analysis. The final Master Plan describes the status in the DH Company in Legionowo, possible improvements and an investment plan for the selected scenario. (BA)

  1. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    Science.gov (United States)

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.

    2009-01-01

    completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  2. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  3. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  4. Development of an international safeguards approach to the final disposal of spent fuel in geological repositories

    International Nuclear Information System (INIS)

    Murphey, W.M.; Moran, B.W.; Fattah, A.

    1996-01-01

    The International Atomic Energy Agency (IAEA) is currently pursuing development of an international safeguards approach for the final disposal of spent fuel in geological repositories through consultants meetings and through the Program for Development of Safeguards for Final Disposal of Spent Fuel in Geological Repositories (SAGOR). The consultants meetings provide policy guidance to IAEA; SAGOR recommends effective approaches that can be efficiently implemented by IAEA. The SAGOR program, which is a collaboration of eight Member State Support Programs (MSSPs), was initiated in July 1994 and has identified 15 activities in each of three areas (i.e. conditioning facilities, active repositories, and closed repositories) that must be performed to ensure an efficient, yet effective safeguards approach. Two consultants meetings have been held: the first in May 1991 and the last in November 1995. For nuclear materials emplaced in a geological repository, the safeguards objectives were defined to be (1) to detect the diversion of spent fuel, whether concealed or unconcealed, from the repository and (2) to detect undeclared activities of safeguards concern (e.g., tunneling, underground reprocessing, or substitution in containers)

  5. DEVELOPING FINAL COURSE MONOGRAPHS USING A TEAM-BASED LEARNING METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Ani Mari Hartz

    2016-04-01

    Full Text Available This article describes an experience with the Team-Based Learning (TBL methodology in courses designed to support the planning and execution of final course monographs. It contains both professors’ and students’ perceptions, through observation and assessment. A qualitative approach using observation techniques and desk research was used in conjunction with a quantitative approach based on a questionnaire. The sample consisted of 49 students from a higher education institution, 27 of them in a Communication Course and the remaining 22 in a Business Administration course. Qualitative data analysis was performed through simple categorization with back-defined categories, while the quantitative data analysis employed descriptive statistics and cluster analysis using Minitab 17.1 software. The main findings include the identification of: three student profiles (designated as traditional, collaborative and practical; a preference for guidance and feedback from the professor rather than other students; and a need for a professor-led closing discussion when applying the TBL method. As regards the main benefits to students, they recognized that discussion in groups allowed them to realize how much they really know about the subject studied. Finally, most students seemed to like the TBL approach.

  6. Discrepancies between selected Pareto optimal plans and final deliverable plans in radiotherapy multi-criteria optimization.

    Science.gov (United States)

    Kyroudi, Archonteia; Petersson, Kristoffer; Ghandour, Sarah; Pachoud, Marc; Matzinger, Oscar; Ozsahin, Mahmut; Bourhis, Jean; Bochud, François; Moeckli, Raphaël

    2016-08-01

    Multi-criteria optimization provides decision makers with a range of clinical choices through Pareto plans that can be explored during real time navigation and then converted into deliverable plans. Our study shows that dosimetric differences can arise between the two steps, which could compromise the clinical choices made during navigation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  7. Selected approaches to determining the purpose of emergency planning zones

    Science.gov (United States)

    Dobeš, Pavel; Baudišová, Barbora; Sluka, Vilém; Skřínský, Jan; Danihelka, Pavel; Dlabka, Jakub; Řeháček, Jakub

    2013-04-01

    One of the major accident hazards (hereinafter referred to as "MAH") tools to determine the range of effects of a major accident and consequent protection of the public is the determination of the emergency planning zone (hereinafter referred to as "zone"). In the Czech Republic, the determination of the zone is regulated by the Decree No. 103/2006 Coll. laying down the principles for determination of the emergency planning zone and the extent and manner of elaborating the external emergency plan (hereinafter referred to as "Decree") 3. The Decree is based on the principles of the IAEA-TECDOC-727 method - Manual for the Classification and Prioritization of Risks Due to Major Accidents in Process and Related Industries (hereinafter referred to as "method" and "manual", respectively)3. In the manual, it is pointed out that the method used is not suitable for making emergency plans for special situations (industrial activities in an inhabited area). Nonetheless, its principles and procedures are still used for such purposes in the Czech Republic. The expert scientific community dealing with MAH issues in the Czech Republic, however, realizes that the procedure of the zone boundary delineation should be modified to reflect up-to-date knowledge in protection of the public and its enhancement. Therefore, the OPTIZON Project (Optimization of the Emergency Planning Zone Designation and Elaboration of Emergency Plans Based on Threatening Effects of Dangerous Chemical Substances at Operational Accidents with Respect to Inhabitant Protection Enhancement) was developed and approved for the Program of Security Research of the Czech Republic 2010 - 2015 (BV II/2-VS). One of the main project's objectives is to define clearly the purpose of the zone because at present it is not quite apparent. From the general view, this step may seem insignificant or trivial, but the reverse is true. It represents one of the most important stages in seeking the approach to the zone designation as

  8. The effect of career planning education

    Directory of Open Access Journals (Sweden)

    Marija Turnšek Mikačič

    2015-09-01

    Full Text Available Research Question (RQ: We employed a qualitative approach to study the effects of career planning education, perceiving it as an effective way to gain a deeper understanding of introductorily-organised career education. Purpose: We researched important areas to formulate a questionnaire for quantitative analysis. Method: We used a qualitative research approach in order to develop a theoretical framework for the exploration, interpretation and identification of the impact of education on career plans, on the changing attitudes towards careers, the raising of self-esteem and perception of personal growth. We used Neuro-linguistic programming as a tool to develop and achieve personal excellence within the career planning. Results: We constructed a paradigmatic model and developed the final theory. By means of qualitative analysis, we identified the elements of design criteria for the construction of the questionnaire; we measured the effects of education on career plans. Organization: The findings of the research will prove useful in personal management and career management in the process of planning and organizing the promotion of individuals within the organizations in accordance with the needs of those organizations. Originality: A career plan as a building block of personal growth, based on the model of career education with the in-built elements and tools of NLP, has been confirmed by the most recent studies in neuroscience. This represents a novelty, and, therefore, this study offers a genuine contribution, and is an indicator of contemporary knowledge, based on the results of the research. Limitations/Future Research: The model of career education and the results of this study open new directions for further research of the influence of career planning on the organisation of companies and their success, which is the phase of the study which was not carried out.

  9. Energy supply planning in Iran by using fuzzy linear programming approach (regarding uncertainties of investment costs)

    International Nuclear Information System (INIS)

    Sadeghi, Mehdi; Mirshojaeian Hosseini, Hossein

    2006-01-01

    For many years, energy models have been used in developed or developing countries to satisfy different needs in energy planning. One of major problems against energy planning and consequently energy models is uncertainty, spread in different economic, political and legal dimensions of energy planning. Confronting uncertainty, energy planners have often used two well-known strategies. The first strategy is stochastic programming, in which energy system planners define different scenarios and apply an explicit probability of occurrence to each scenario. The second strategy is Minimax Regret strategy that minimizes regrets of different decisions made in energy planning. Although these strategies have been used extensively, they could not flexibly and effectively deal with the uncertainties caused by fuzziness. 'Fuzzy Linear Programming (FLP)' is a strategy that can take fuzziness into account. This paper tries to demonstrate the method of application of FLP for optimization of supply energy system in Iran, as a case study. The used FLP model comprises fuzzy coefficients for investment costs. Following the mentioned purpose, it is realized that FLP is an easy and flexible approach that can be a serious competitor for other confronting uncertainties approaches, i.e. stochastic and Minimax Regret strategies. (author)

  10. Inter-active and dynamic approaches on forest and land-use planning - proceedings from a training workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sandewall, Mats [ed.

    1999-07-01

    This document summarises the outcome of a training workshop, 'Inter-active and dynamic approaches on forest and land-use planning', that was organised in Vietnam and Lao PDR during April 1999. The workshop was arranged by researchers from SLU, Umeaa in cooperation with SIDA and it's CCB programme, The National Board of Forestry and concerned government institutions in Lao PDR - The national Programme for Shifting Cultivation Stabilisation, Ministry of Agriculture and Forestry , and in Vietnam - the Forest Inventory and Planning Institute, Ministry of Agriculture and Rural Development. The main purpose of this paper are: (1) to review and conclude the outcome of the workshop to all those who have participated or been concerned with it; (2) to summarise an evaluation of the somewhat unique arrangement, with participants from different sectors, administrative levels, gender and countries; and (3) to present 'the APM approach' on land use planning, which was put forward, tested and discussed during the workshop.

  11. From justice in planning toward planning for justice: A capability approach

    NARCIS (Netherlands)

    Basta, Claudia

    2016-01-01

    This article discusses the relevance of Rawls’ Theory and Sen’s Idea of justice to contemporary planning theory by drawing on the writings of the two philosophers. Besides providing a comprehensive account of what the two respective frameworks imply for the foundation of public planning and for the

  12. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  13. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  14. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  15. Comparison of marine spatial planning methods in Madagascar demonstrates value of alternative approaches.

    Directory of Open Access Journals (Sweden)

    Thomas F Allnutt

    Full Text Available The Government of Madagascar plans to increase marine protected area coverage by over one million hectares. To assist this process, we compare four methods for marine spatial planning of Madagascar's west coast. Input data for each method was drawn from the same variables: fishing pressure, exposure to climate change, and biodiversity (habitats, species distributions, biological richness, and biodiversity value. The first method compares visual color classifications of primary variables, the second uses binary combinations of these variables to produce a categorical classification of management actions, the third is a target-based optimization using Marxan, and the fourth is conservation ranking with Zonation. We present results from each method, and compare the latter three approaches for spatial coverage, biodiversity representation, fishing cost and persistence probability. All results included large areas in the north, central, and southern parts of western Madagascar. Achieving 30% representation targets with Marxan required twice the fish catch loss than the categorical method. The categorical classification and Zonation do not consider targets for conservation features. However, when we reduced Marxan targets to 16.3%, matching the representation level of the "strict protection" class of the categorical result, the methods show similar catch losses. The management category portfolio has complete coverage, and presents several management recommendations including strict protection. Zonation produces rapid conservation rankings across large, diverse datasets. Marxan is useful for identifying strict protected areas that meet representation targets, and minimize exposure probabilities for conservation features at low economic cost. We show that methods based on Zonation and a simple combination of variables can produce results comparable to Marxan for species representation and catch losses, demonstrating the value of comparing alternative

  16. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  17. Financial Literacy and Financial Planning in France

    Directory of Open Access Journals (Sweden)

    Luc Arrondel

    2013-07-01

    Full Text Available We study financial literacy in France using the PATER survey and following the Lusardi and Mitchell (2011c approach. We find that some subpopulations are less financially literate than others: women, young and old people as well as less-educated people are more likely to face difficulties when dealing with fundamental financial concepts such as risk diversification and inflation and interest compounding. We also find some differences in financial knowledge depending on the political opinion of the respondents. Finally we show that these differences in financial knowledge are correlated with differences in the propensity to plan: people who score higher on the financial literacy questions are more likely to be engaged in the preparation of a clearly defined financial plan.

  18. MO-B-BRB-00: Optimizing the Treatment Planning Process

    International Nuclear Information System (INIS)

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  19. MO-B-BRB-00: Optimizing the Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  20. Planning for Self-Renewal: A New Approach to Planned Organizational Change.

    Science.gov (United States)

    Palola, Ernest G.; Padgett, William

    This monograph presents the findings of a study of planning and change at 80 colleges and universities, private and public, located in four separate states--California, Florida, Illinois and New York. In Chapter I, different substantive crises now facing higher education are presented and discussed. The next chapter (II), analyzes planning styles…

  1. City of North Vancouver greenhouse gas local action plan : final report

    International Nuclear Information System (INIS)

    Hood, I.

    2005-02-01

    This paper presented details of a greenhouse gas (GHG) local action plan developed as a result of the City of North Vancouver's participation in the Partners for Climate Protection Program (PCPP). The plan is intended to better manage the impacts of urban development related to GHG and air quality, while also achieving community objectives related to affordable housing, transportation management, job creation and economic development. The report reviewed the local emissions inventory in addition to various programs, plans, policies and by-laws relating to energy management. Potential policies and programs were identified to achieve GHG emissions reductions in accordance with the PCPP. A plan for emissions reductions was also presented. A situation analysis was presented with details of population, transportation, residential and commercial building and industry. Solid waste management and transportation plans were outlined. A GHG emissions profile and forecast was presented. An outline of a GHG management framework included information on initiatives in the city as well as details of public consultation feedback. A program implementation plan includes forecasts of the program's impact, as well as details of program delivery and a performance measurement framework. Proposed initiatives in the plan included new building guidelines; fuel switching for light and heavy duty vehicles; driver training and enhanced vehicle maintenance programs; and, an environmental procurement policy. Community programs include residential and commercial building retrofits; land use planning; support for community energy systems; green building design guidelines; transportation demand management; and, public engagement and outreach programs. 21 tabs., 9 figs

  2. Addressing uncertainty in adaptation planning for agriculture.

    Science.gov (United States)

    Vermeulen, Sonja J; Challinor, Andrew J; Thornton, Philip K; Campbell, Bruce M; Eriyagama, Nishadi; Vervoort, Joost M; Kinyangi, James; Jarvis, Andy; Läderach, Peter; Ramirez-Villegas, Julian; Nicklin, Kathryn J; Hawkins, Ed; Smith, Daniel R

    2013-05-21

    We present a framework for prioritizing adaptation approaches at a range of timeframes. The framework is illustrated by four case studies from developing countries, each with associated characterization of uncertainty. Two cases on near-term adaptation planning in Sri Lanka and on stakeholder scenario exercises in East Africa show how the relative utility of capacity vs. impact approaches to adaptation planning differ with level of uncertainty and associated lead time. An additional two cases demonstrate that it is possible to identify uncertainties that are relevant to decision making in specific timeframes and circumstances. The case on coffee in Latin America identifies altitudinal thresholds at which incremental vs. transformative adaptation pathways are robust options. The final case uses three crop-climate simulation studies to demonstrate how uncertainty can be characterized at different time horizons to discriminate where robust adaptation options are possible. We find that impact approaches, which use predictive models, are increasingly useful over longer lead times and at higher levels of greenhouse gas emissions. We also find that extreme events are important in determining predictability across a broad range of timescales. The results demonstrate the potential for robust knowledge and actions in the face of uncertainty.

  3. Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

    Science.gov (United States)

    Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan

    2016-01-01

    The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

  4. Strategic planning approach to nuclear training

    International Nuclear Information System (INIS)

    Mills, R.J.

    1985-01-01

    Detroit Edison Company's Nuclear Training group used an organizational planning process that yielded significant results in 1984. At the heart of the process was a concept called the Driving Force which served as the basis for the development of goals, objectives, and action plants. A key ingredient of the success of the planning process was the total, voluntary participation by all members of the organization

  5. Planning and urbanistic projects – the non-author approach and issues of synergy in cooperation

    Directory of Open Access Journals (Sweden)

    Liljana Jankovič Grobelšek

    2005-01-01

    Full Text Available The article presents the non-author approach to urbanistic and planning projects. The project leader guides the entire project team, yet particular coordinators are also important. Contrary to authorship in architectural projects, in physical planning authorship is often or even always completely shared. Not only because planning projects can change significantly during adoption procedures, but mainly because there are many participating actors (designers, planners, commissioners and/or investors etc. that are involved in any project’s undertaking. Experience proves that the non-author approach is beneficial for good project management and creation of conditions for constructive cooperation within an interdisciplinary working group and with all the other contributing parties. Two tested examples are presented. Their comparison is very interesting, since the first example shows a project where good cooperation between the client, investor and designers, as well as willing interested public, conditioned quality improvements, while the second (because of the public and consequently against its interests diminished its quality significantly. Our judgement is that the quantity of the often mentioned necessity of public involvement is actually sufficient. There are no obstacles for public participation in urbanistic and physical planning, as long as the public is interested. Troubles are often triggered elsewhere – how to safeguard the common, public interest before particular publics (e.g. neighbours, the immediately affected etc..

  6. Review. Assessing uncertainty and risk in forest planning and decision support systems: review of classical methods and introduction of innovative approaches

    Energy Technology Data Exchange (ETDEWEB)

    Pasalodos-Tato, M.; Makinen, A.; Garcia-Gonzalez, J.; Borges, J. G.; Lamas, T.; Eriksson, L. O.

    2013-09-01

    Aim: Since forest planning is characterized by long time horizon and it typically involves large areas of land and numerous stake holders, uncertainty and risk should play an important role when developing forest management plans. The aim of this study is to review different methods to deal with risk and uncertainty in forest planning, listing problems that forest managers may face during the preparation of management plans and trying to give recommendations in regard to the application of each method according to the problem case. The inclusion of risk and uncertainty in decision support systems is also analyzed. Area: It covers the temporal and spatial scale of forest planning, the spatial context, the participation process, the objectives dimensions and the good and services addressed. Material and methods: Several hundreds of articles dealing with uncertainty and risk were identified regarding different forestry-related topics and approaches. Form them, around 170 articles were further reviewed, categorized and evaluated. Main results: The study presents a thorough review and classification of methods and approaches to consider risk and uncertainty in forest planning. Moreover, new approaches are introduced, showing the opportunities that their application presents in forest planning. Research highlights: The study can aid forest managers in the decision making process when designing a forest management plan considering risk and uncertainty. (Author)

  7. Review. Assessing uncertainty and risk in forest planning and decision support systems: review of classical methods and introduction of new approaches

    Directory of Open Access Journals (Sweden)

    M. Pasalodos-Tato

    2013-07-01

    Full Text Available Aim: Since forest planning is characterized by long time horizon and it typically involves large areas of land and numerous stakeholders, uncertainty and risk should play an important role when developing forest management plans. The aim of this study is to review different methods to deal with risk and uncertainty in forest planning, listing problems that forest managers may face during the preparation of management plans and trying to give recommendations in regard to the application of each method according to the problem case. The inclusion of risk and uncertainty in decision support systems is also analyzed.Area: It covers the temporal and spatial scale of forest planning, the spatial context, the participation process, the objectives dimensions and the good and services addressed.Material and methods: Several hundreds of articles dealing with uncertainty and risk were identified regarding different forestry-related topics and approaches. Form them, around 170 articles were further reviewed, categorized and evaluated.Main results: The study presents a thorough review and classification of methods and approaches to consider risk and uncertainty in forest planning. Moreover, new approaches are introduced, showing the opportunities that their application present in forest planning.Research highlights: The study can aid forest managers in the decision making process when designing a forest management plan considering risk and uncertainty.Keywords: operations research; optimal alternative; stochastic risk; endogenous risk; stand level; forest level.

  8. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  9. Orthognathic Surgery: Planning and treatment with illustration on six cases

    International Nuclear Information System (INIS)

    AiRuhaimi, K; Nwoku, A. L; Shaikh, H. S

    1991-01-01

    Almost all conferences for plastic and maxillofacial surgery discuss reports on several methods of orthognathic surgery, planning, success results, and complications of the different procedures carried out to correct patient's soft and hard tissues frontal profiles and occlusal discrepancies. Various principles are involved in the diagnosis and treatment of facial deformities. However, the most important consideration, after all, is the final accepted aesthetic and functional requirements and stability of the moved segments. The objective of this paper is to give the basic principles of treatment planning for correcting facial discrepancies, surgical approach to different cases, and the methods to increase stability of the moved segments. Six cases are included to illustrate the different aspects of treatment planning, surgical management, and stabilization methods. (author)

  10. Advanced methodology for generation expansion planning including interconnected systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, M; Yokoyama, R; Yasuda, K [Tokyo Metropolitan Univ. (Japan); Sasaki, H [Hiroshima Univ. (Japan); Ogimoto, K [Electric Power Development Co. Ltd., Tokyo (Japan)

    1994-12-31

    This paper reviews advanced methodology for generation expansion planning including interconnected systems developed in Japan, putting focus on flexibility and efficiency in a practical application. First, criteria for evaluating flexibility of generation planning considering uncertainties are introduced. Secondly, the flexible generation mix problem is formulated as a multi-objective optimization with more than two objective functions. The multi-objective optimization problem is then transformed into a single objective problem by using the weighting method, to obtain the Pareto optimal solution, and solved by a dynamics programming technique. Thirdly, a new approach for electric generation expansion planning of interconnected systems is presented, based on the Benders Decomposition technique. That is, large scale generation problem constituted by the general economic load dispatch problem, and several sub problems which are composed of smaller scale isolated system generation expansion plans. Finally, the generation expansion plan solved by an artificial neural network is presented. In conclusion, the advantages and disadvantages of this method from the viewpoint of flexibility and applicability to practical generation expansion planning are presented. (author) 29 refs., 10 figs., 4 tabs.

  11. A case-based approach to understanding vacation planning

    Science.gov (United States)

    Susan I. Stewart; Christine A. Vogt

    1999-01-01

    Vacations provide an opportunity to make many choices, and even for travelers who want their vacations to be spontaneous, planning is often an important part of vacationing. Although descriptive studies of travel planning have sketched out the elements of the vacation plan, these elements have not been drawn together in a conceptual model of the consumer planning...

  12. An Approach to Evaluate Comprehensive Plan and Identify Priority Lands for Future Land Use Development to Conserve More Ecological Values

    Directory of Open Access Journals (Sweden)

    Long Zhou

    2018-01-01

    Full Text Available Urbanization has significant impacts on the regional environmental quality through altering natural lands, converting them to urban built-up areas. One common strategy applied by urban planners to manage urbanization and preserve natural resources is to make a comprehensive plan and concentrate future land use in certain areas. However, in practice, planners used to make future land use planning mainly based on their subjective interpretations with limited ecological supporting evidence and analysis. Here, we propose a new approach composed of ecological modelling and land use zoning in the spatial matrix to evaluate the comprehensive plan and identify priority lands for sustainable land use planning. We use the city of Corvallis, OR, as the test bed to demonstrate this new approach. The results indicate that the Corvallis Comprehensive Plan 1998–2020 featured with compact development is not performing efficiently in conserving ecological values, and the land use plan featured with mixed-use spreading development generated by the proposed approach meets the city’s land demands for urban growth, and conserves 103% more ecological value of retaining storm water nitrogen, 270% more ecological value of retaining storm water phosphorus and 19% more ecological value in storing carbon in the whole watershed. This study indicates that if planned with scientific analysis and evidence, spreading urban development does not necessarily result in less sustainable urban environment than the compact development recommended in smart growth.

  13. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  14. Tools for an integrated systems approach to sustainable port city planning

    Directory of Open Access Journals (Sweden)

    Gilles Morel

    2013-12-01

    Full Text Available Large port cities like Shanghai, Amsterdam and Rio de Janeiro are key cogwheels in international logistics and transport networks but also serve as showcases for the rest of the world; as such, they constitute strategic assets for the host country´s economy and international influence. Historically, a city and its port often developed independently, through sometimes contradictory or even confrontational policies. Today, the growing number of usage disputes over increasingly coveted coastal areas is prompting local managers to incorporate urban and port-related issues in overarching planning programs. In particular, planning of the sea front and the buffer zone between the port and the city must contribute decisively to the deployment of more effective, cleaner transport services for the port city as a whole. In general, one of the key global challenges for planners and decision-makers consists in integrating sustainable development goals (environmental and social components, as well as the stimulation of industrial competitiveness into urban planning. In this context the PHEBUS research group has initiated an international program of research to develop innovative methods and tools that can help territorial stakeholders to design, evaluate, compare and ultimately choose development scenarios for the future of their port cities. The main themes are addressed via a multidisciplinary systems approach on the scale of a coastal urban area with an industrial and port complex. In particular, the themes include sea front planning, the city-port interface, energy optimization (e.g. the introduction and sharing of renewable energies, risk resilience, climate change and multimodal, clean transport.

  15. The future of hydropower planning modeling

    Science.gov (United States)

    Haas, J.; Zuñiga, D.; Nowak, W.; Olivares, M. A.; Castelletti, A.; Thilmant, A.

    2017-12-01

    Planning the investment and operation of hydropower plants with optimization tools dates back to the 1970s. The focus used to be solely on the provision of energy. However, advances in computational capacity and solving algorithms, dynamic markets, expansion of renewable sources, and a better understanding of hydropower environmental impacts have recently led to the development of novel planning approaches. In this work, we provide a review, systematization, and trend analysis of these approaches. Further, through interviews with experts, we outline the future of hydropower planning modeling and identify the gaps towards it. We classified the found models along environmental, economic, multipurpose and technical criteria. Environmental interactions include hydropeaking mitigation, water quality protection and limiting greenhouse gas emissions from reservoirs. Economic and regulatory criteria consider uncertainties of fossil fuel prices and relicensing of water rights and power purchase agreements. Multipurpose considerations account for irrigation, tourism, flood protection and drinking water. Recently included technical details account for sedimentation in reservoirs and variable efficiencies of turbines. Additional operational considerations relate to hydrological aspects such as dynamic reservoir inflows, water losses, and climate change. Although many of the above criteria have been addressed in detail on a project-to-project basis, models remain overly simplistic for planning large power fleets. Future hydropower planning tools are expected to improve the representation of the water-energy nexus, including environmental and multipurpose criteria. Further, they will concentrate on identifying new sources of operational flexibility (e.g. through installing additional turbines and pumps) for integrating renewable energy. The operational detail will increase, potentially emphasizing variable efficiencies, storage capacity losses due to sedimentation, and the

  16. Application of an uncertainty analysis approach to strategic environmental assessment for urban planning.

    Science.gov (United States)

    Liu, Yi; Chen, Jining; He, Weiqi; Tong, Qingyuan; Li, Wangfeng

    2010-04-15

    Urban planning has been widely applied as a regulatory measure to guide a city's construction and management. It represents official expectations on future population and economic growth and land use over the urban area. No doubt, significant variations often occur between planning schemes and actual development; in particular in China, the world's largest developing country experiencing rapid urbanization and industrialization. This in turn leads to difficulty in estimating the environmental consequences of the urban plan. Aiming to quantitatively analyze the uncertain environmental impacts of the urban plan's implementation, this article developed an integrated methodology combining a scenario analysis approach and a stochastic simulation technique for strategic environmental assessment (SEA). Based on industrial development scenarios, Monte Carlo sampling is applied to generate all possibilities of the spatial distribution of newly emerged industries. All related environmental consequences can be further estimated given the industrial distributions as input to environmental quality models. By applying a HSY algorithm, environmentally unacceptable urban growth, regarding both economic development and land use spatial layout, can be systematically identified, providing valuable information to urban planners and decision makers. A case study in Dalian Municipality, Northeast China, is used to illustrate applicability of this methodology. The impacts of Urban Development Plan for Dalian Municipality (2003-2020) (UDP) on atmospheric environment are also discussed in this article.

  17. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  18. The role of policy-making and planning cultures for sustainable transport?

    DEFF Research Database (Denmark)

    Hansen, Carsten Jahn

    2011-01-01

    for underlying sets of values and norms to enter the policy process more freely and explicitly. However, do we then have the cultures and moral force to build effective sustainable transport policies and plans? The article therefore also looks into a range of overlapping approaches that may potentially aid...... in rethinking and rebuilding transport policy-making and planning processes in terms of cultural learning processes. Finally, the role of the planner as a ‘cultural entrepreneur’ and ‘cultural story-teller’ is presented as potential tool to push through new agendas or ideas, such as more sustainable transport...

  19. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  20. Planning, design and technological criteria of conventional and nuclear shelters

    International Nuclear Information System (INIS)

    Sadoon, A.S.

    1989-01-01

    The thesis aims to establish a special criteria for building the shelters in two types. The conventional and nuclear, in respect to planning design and technological aspects, and finally establishing a special reference of planning, design and technology for Iraq which can be used when planning or designing a conventional or nuclear shelter. The thesis included four chapters, the first chapter included definition of shelters, and explanation of the effects of all types of weapons on buildings, and the second chapter included definition of planning and design concepts of shelters in its two types and analytical studies for international examples. The third chapter covered definition for technologies of structural, mechanical, electrical and sanitary systems. The fourth chapter included details of a case study in order to approach the results of research which included the conclusions, recommendations, criteria and prospects of planning design and technological aspects. 51 tabs.; 180 figs.; 32 refs.; 15 apps

  1. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  2. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  3. A Quantitative Exposure Planning Tool for Surgical Approaches to the Sacroiliac Joint.

    Science.gov (United States)

    Phelps, Kevin D; Ming, Bryan W; Fox, Wade E; Bellamy, Nelly; Sims, Stephen H; Karunakar, Madhav A; Hsu, Joseph R

    2016-06-01

    To aid in surgical planning by quantifying and comparing the osseous exposure between the anterior and posterior approaches to the sacroiliac joint. Anterior and posterior approaches were performed on 12 sacroiliac joints in 6 fresh-frozen torsos. Visual and palpable access to relevant surgical landmarks was recorded. Calibrated digital photographs were taken of each approach and analyzed using Image J. The average surface areas of exposed bone were 44 and 33 cm for the anterior and posterior approaches, respectively. The anterior iliolumbar ligament footprint could be visualized in all anterior approaches, whereas the posterior aspect could be visualized in all but one posterior approach. The anterior approach provided visual and palpable access to the anterior superior edge of the sacroiliac joint in all specimens, the posterior superior edge in 75% of specimens, and the inferior margin in 25% and 50% of specimens, respectively. The inferior sacroiliac joint was easily visualized and palpated in all posterior approaches, although access to the anterior and posterior superior edges was more limited. The anterior S1 neuroforamen was not visualized with either approach and was more consistently palpated when going posterior (33% vs. 92%). Both anterior and posterior approaches can be used for open reduction of pure sacroiliac dislocations, each with specific areas for assessing reduction. In light of current plate dimensions, fractures more than 2.5 cm lateral to the anterior iliolumbar ligament footprint are amenable to anterior plate fixation, whereas those more medial may be better addressed through a posterior approach.

  4. Business planning for digital libraries international approaches

    CERN Document Server

    Collier, Mel

    2010-01-01

    This book brings together international experience of business planning for digital libraries: the business case, the planning processes involved, the costs and benefi ts, practice and standards, and comparison with the traditional library where appropriate. Although there is a vast literature already on other aspects of digital libraries, business planning is a subject that until now has not been systematically integrated in a book.Digital libraries are being created not only by traditional libraries, but by museums, archives, media organizations, and indeed any organization concerned with ma

  5. Optimization of Investment Planning Based on Game-Theoretic Approach

    Directory of Open Access Journals (Sweden)

    Elena Vladimirovna Butsenko

    2018-03-01

    Full Text Available The game-theoretic approach has a vast potential in solving economic problems. On the other hand, the theory of games itself can be enriched by the studies of real problems of decision-making. Hence, this study is aimed at developing and testing the game-theoretic technique to optimize the management of investment planning. This technique enables to forecast the results and manage the processes of investment planning. The proposed method of optimizing the management of investment planning allows to choose the best development strategy of an enterprise. This technique uses the “game with nature” model, and the Wald criterion, the maximum criterion and the Hurwitz criterion as criteria. The article presents a new algorithm for constructing the proposed econometric method to optimize investment project management. This algorithm combines the methods of matrix games. Furthermore, I show the implementation of this technique in a block diagram. The algorithm includes the formation of initial data, the elements of the payment matrix, as well as the definition of maximin, maximal, compromise and optimal management strategies. The methodology is tested on the example of the passenger transportation enterprise of the Sverdlovsk Railway in Ekaterinburg. The application of the proposed methodology and the corresponding algorithm allowed to obtain an optimal price strategy for transporting passengers for one direction of traffic. This price strategy contributes to an increase in the company’s income with minimal risk from the launch of this direction. The obtained results and conclusions show the effectiveness of using the developed methodology for optimizing the management of investment processes in the enterprise. The results of the research can be used as a basis for the development of an appropriate tool and applied by any economic entity in its investment activities.

  6. An ecological approach to seeking and utilising the views of young people with intellectual disabilities in transition planning.

    Science.gov (United States)

    Small, Neil; Raghavan, Raghu; Pawson, Nicole

    2013-12-01

    Transition planning using a person-centred approach has, in the main, failed to shape service provision. We offer an alternative based on an ecological understanding of human development linked to public health approaches that prioritise whole system planning. A total of 43 young people with intellectual disabilities, in Bradford, England, who were approaching transition from school or college were recruited to a qualitative study. Their ethnic breakdown was as follows: 16 white British, 24 Pakistani, 2 Bangladeshi and 1 Black African. Each young person was interviewed twice, at recruitment and a year later, to observe any changes in their social networks during transition. Interviews were undertaken with a semi-structured interview schedule and with the pictorial approach of Talking Mats. Both the networks the young people live within, and their sense of what the future might hold for them, are described and linked to Bronfenbrenner's ecological model of human development. The importance of the family and school is emphasised, as is the absence of engagement in leisure activities and work. Transition planning needs to start with mapping the systems individuals live within, areas of strength should be supported and parts of the system, which are not fit for purpose for these young people, should be prioritised for interventions.

  7. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  8. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  9. The development of an adolescent smoking cessation intervention--an Intervention Mapping approach to planning.

    Science.gov (United States)

    Dalum, Peter; Schaalma, Herman; Kok, Gerjo

    2012-02-01

    The objective of this project was to develop a theory- and evidence-based adolescent smoking cessation intervention using both new and existing materials. We used the Intervention Mapping framework for planning health promotion programmes. Based on a needs assessment, we identified important and changeable determinants of cessation behaviour, specified change objectives for the intervention programme, selected theoretical change methods for accomplishing intervention objectives and finally operationalized change methods into practical intervention strategies. We found that guided practice, modelling, self-monitoring, coping planning, consciousness raising, dramatic relief and decisional balance were suitable methods for adolescent smoking cessation. We selected behavioural journalism, guided practice and Motivational Interviewing as strategies in our intervention. Intervention Mapping helped us to develop as systematic adolescent smoking cessation intervention with a clear link between behavioural goals, theoretical methods, practical strategies and materials and with a strong focus on implementation and recruitment. This paper does not present evaluation data.

  10. A Descriptive Case Study of Appreciative Inquiry as an Approach to Strategic Planning for Special Education in a Public School

    Science.gov (United States)

    Ruhlman, Paul L., Jr.

    2014-01-01

    This study's purpose was to describe appreciative inquiry (AI) as an approach to strategic planning for special education in a public school. The study investigated four research questions. How do plans for special education emerge as participants engage in the four phases of AI during strategic planning for the future of special education in a…

  11. A revised 3-column classification approach for the surgical planning of extended lateral tibial plateau fractures.

    Science.gov (United States)

    Hoekstra, H; Kempenaers, K; Nijs, S

    2017-10-01

    Variable angle locking compression plates allow for lateral buttress and support of the posterolateral joint surface of tibial plateau fractures. This gives room for improvement of the surgical 3-column classification approach. Our aim was to revise and validate the 3-column classification approach to better guide the surgical planning of tibial plateau fractures extending into the posterolateral corner. In contrast to the 3-column classification approach, in the revised approach the posterior border of the lateral column in the revised approach lies posterior instead of anterior of the fibula. According to the revised 3-column classification approach, extended lateral column fractures are defined as single lateral column fractures extending posteriorly into the posterolateral corner. CT-images of 36 patients were reviewed and classified twice online according to Schatzker and revised 3-column classification approach by five observers. The intraobserver reliability was calculated using the Cohen's kappa and the interobserver reliability was calculated using the Fleiss' kappa. The intraobserver reliability showed substantial agreement according to Landis and Koch for both Schatzker and the revised 3-column classification approach (0.746 vs. 0.782 p = 0.37, Schatzker vs. revised 3-column, respectively). However, the interobserver reliability of the revised 3-column classification approach was significantly higher as compared to the Schatzker classification (0.531 vs. 0.669 p column, respectively). With the introduction of variable angle locking compression plates, the revised 3-column classification approach is a very helpful tool in the preoperative surgical planning of tibial plateau fractures, in particular, lateral column fractures that extend into the posterolateral corner. The revised 3-column classification approach is rather a practical supplement to the Schatzker classification. It has a significantly higher interobserver reliability as compared to the

  12. Strategic planning of the National Direction of Nuclear Technology: period 2002-2005 last report; Planificacion estrategica de la Direccion Nacional de Tecnologia Nuclear: periodo 2002-2005 informe final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    The final report of strategic planning describes the uses and applications of the Nuclear Technology, situation, tendencies so much at international level as national, institutional organization of the Nuclear Sector in the Uruguay, assignment of the DNTN, nuclear politics of the Uruguay, development of the Net or Nuclear Sector and model proposed for Uruguay, general conclusions and Strategic Plan.

  13. Modeling an integrated hospital management planning problem using integer optimization approach

    Science.gov (United States)

    Sitepu, Suryati; Mawengkang, Herman; Irvan

    2017-09-01

    Hospital is a very important institution to provide health care for people. It is not surprising that nowadays the people’s demands for hospital is increasing. However, due to the rising cost of healthcare services, hospitals need to consider efficiencies in order to overcome these two problems. This paper deals with an integrated strategy of staff capacity management and bed allocation planning to tackle these problems. Mathematically, the strategy can be modeled as an integer linear programming problem. We solve the model using a direct neighborhood search approach, based on the notion of superbasic variables.

  14. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  15. Planning for Office Automation.

    Science.gov (United States)

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  16. An optimisation approach for capacity planning: modelling insights and empirical findings from a tactical perspective

    Directory of Open Access Journals (Sweden)

    Andréa Nunes Carvalho

    2017-09-01

    Full Text Available Abstract The academic literature presents a research-practice gap on the application of decision support tools to address tactical planning problems in real-world organisations. This paper addresses this gap and extends a previous action research relative to an optimisation model applied for tactical capacity planning in an engineer-to-order industrial setting. The issues discussed herein raise new insights to better understand the practical results that can be achieved through the proposed model. The topics presented include the modelling of objectives, the representation of the production process and the costing approach, as well as findings regarding managerial decisions and the scope of action considered. These insights may inspire ideas to academics and practitioners when developing tools for capacity planning problems in similar contexts.

  17. Rolling schedule approaches for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.

    2005-01-01

    Supply Chain Operations Planning (SCOP) involves the determination of an extensive production plan for a network of manufacturing and distribution entities within and across organizations. The production plan consist of order release decisions that allocate materials and resources in order to

  18. Phase Planning for Overall Copper-Fiber Switch-over

    DEFF Research Database (Denmark)

    Gutierrez Lopez, Jose Manuel; Jensen, Michael; Andreasen, Morten Henius

    2013-01-01

    This paper introduces a phase planning concept to the imminent copper-fiber switch-over action. Traditional copper loops are to be replaced by modern fiber lines in order to keep up with the current evolution of data communications. This work proposes two novel approaches of how to schedule...... this transition by systematically selecting the most attractive areas, in terms of economic efficiency, to be upgraded first. These are alternatively based on 1) distance to the access point and 2)population density, and the overall plan is divided into three phases. In both cases the final network solution...... is the same, but the different prioritization on what areas to upgrade first implies a different distribution of the investment over the deployment period. Two case studies using real geographical data in Denmark show these differences, and the results suggest that planning the phases based on population...

  19. Regional transmission subsystem planning

    Energy Technology Data Exchange (ETDEWEB)

    Costa Bortoni, Edson da [Quadrante Softwares Especializados Ltda., Itajuba, MG (Brazil); Bajay, Sergio Valdir; Barros Correia, Paulo de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica; Santos, Afonso Henriques Moreira; Haddad, Jamil [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    This work presents an approach for the planning of transmission systems by employing mixed--integer linear programming to obtain a cost and operating characteristics optimized system. The voltage loop equations are written in a modified form, so that, at the end of the analysis, the model behaves as a DC power flow, with the help of the two Kirchhoff`s laws, exempting the need of interaction with an external power flow program for analysis of the line loading. The model considers the occurrence of contingencies, so that the final result is a network robust to the most severe contingencies. This whole technique is adapted to the regional electric power transmission subsystems. (author) 9 refs., 4 figs.

  20. An Approach to Developing Independent Learning and Non-Technical Skills Amongst Final Year Mining Engineering Students

    Science.gov (United States)

    Knobbs, C. G.; Grayson, D. J.

    2012-01-01

    There is mounting evidence to show that engineers need more than technical skills to succeed in industry. This paper describes a curriculum innovation in which so-called "soft" skills, specifically inter-personal and intra-personal skills, were integrated into a final year mining engineering course. The instructional approach was…

  1. Urban Adaptation to Climate Change Plans and Policies – the Conceptual Framework of a Methodological Approach

    Directory of Open Access Journals (Sweden)

    Julianna Kiełkowska

    2018-03-01

    Full Text Available The adaptation of urbanised areas to climate change is currently one of the key challenges in the domain of urban policy. The diversity of environmental determinants requires the formulation of individual plans dedicated to the most significant local issues. This article serves as a methodic proposition for the stage of retrieving data (with the PESTEL and the Delphic method, systemic diagnosis (evaluation of risk and susceptibility, prognosis (goal trees, goal intensity map and the formulation of urban adaptation plans. The suggested solution complies with Polish guidelines for establishing adaptation plans. The proposed methodological approach guarantees the participation of various groups of stakeholders in the process of working on urban adaptation plans, which is in accordance with the current tendencies to strengthen the role of public participation in spatial management.

  2. Optimized LTE Cell Planning with Varying Spatial and Temporal User Densities

    KAUST Repository

    Ghazzai, Hakim; Yaacoub, Elias; Alouini, Mohamed-Slim; Dawy, Zaher; Abu Dayya, Adnan

    2015-01-01

    Base station deployment in cellular networks is one of the fundamental problems in network design. This paper proposes a novel method for the cell planning problem for the fourth generation (4G) cellular networks using meta-heuristic algorithms. In this approach, we aim to satisfy both cell coverage and capacity constraints simultaneously by formulating an optimization problem that captures practical planning aspects. The starting point of the planning process is defined through a dimensioning exercise that captures both coverage and capacity constraints. Afterwards, we implement a meta-heuristic algorithm based on swarm intelligence (e.g., particle swarm optimization or the recently-proposed grey wolf optimizer) to find suboptimal base station locations that satisfy both problem constraints in the area of interest which can be divided into several subareas with different spatial user densities. Subsequently, an iterative approach is executed to eliminate eventual redundant base stations. We also perform Monte Carlo simulations to study the performance of the proposed scheme and compute the average number of users in outage. Next, the problems of green planning with regards to temporal traffic variation and planning with location constraints due to tight limits on electromagnetic radiations are addressed, using the proposed method. Finally, in our simulation results, we apply our proposed approach for different scenarios with different subareas and user distributions and show that the desired network quality of service targets are always reached even for large-scale problems.

  3. Optimized LTE Cell Planning with Varying Spatial and Temporal User Densities

    KAUST Repository

    Ghazzai, Hakim

    2015-03-09

    Base station deployment in cellular networks is one of the fundamental problems in network design. This paper proposes a novel method for the cell planning problem for the fourth generation (4G) cellular networks using meta-heuristic algorithms. In this approach, we aim to satisfy both cell coverage and capacity constraints simultaneously by formulating an optimization problem that captures practical planning aspects. The starting point of the planning process is defined through a dimensioning exercise that captures both coverage and capacity constraints. Afterwards, we implement a meta-heuristic algorithm based on swarm intelligence (e.g., particle swarm optimization or the recently-proposed grey wolf optimizer) to find suboptimal base station locations that satisfy both problem constraints in the area of interest which can be divided into several subareas with different spatial user densities. Subsequently, an iterative approach is executed to eliminate eventual redundant base stations. We also perform Monte Carlo simulations to study the performance of the proposed scheme and compute the average number of users in outage. Next, the problems of green planning with regards to temporal traffic variation and planning with location constraints due to tight limits on electromagnetic radiations are addressed, using the proposed method. Finally, in our simulation results, we apply our proposed approach for different scenarios with different subareas and user distributions and show that the desired network quality of service targets are always reached even for large-scale problems.

  4. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  5. INTEGRATED APPROACH TO GENERATION OF PRECEDENCE RELATIONS AND PRECEDENCE GRAPHS FOR ASSEMBLY SEQUENCE PLANNING

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    An integrated approach to generation of precedence relations and precedence graphs for assembly sequence planning is presented, which contains more assembly flexibility. The approach involves two stages. Based on the assembly model, the components in the assembly can be divided into partially constrained components and completely constrained components in the first stage, and then geometric precedence relation for every component is generated automatically. According to the result of the first stage, the second stage determines and constructs all precedence graphs. The algorithms of these two stages proposed are verified by two assembly examples.

  6. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  7. The educational approach within Colombia's nutrition plan (PAN)

    Science.gov (United States)

    de Pizano, Julia Mejia

    1980-03-01

    With the knowledge that malnutrition affects the quality of life of an individual, the Colombian Government set up in 1976 a unique multi-sectorial plan (PAN), to combat the country's serious malnutrition. Government agencies and private industries in the sectors of production, distribution, health, sanitation, and education have coordinated their previously independent efforts. Among the interesting aspects are the coordination of sectors through work at various levels and through control of the budget, the limitation of bureaucracy, and the decentralization of decision-making. The ongoing attempts to overcome the difficulties encountered include making decisions in the face of inconclusive knowledge on what constitutes a well-balanced diet; combating the lack of knowledge of professionals about the environment of the poorest percentage of the population; and revising the traditional teaching method to make it more successful through a multi-media approach to assure wider coverage and more impact for the least cost, using materials such as games, puppets, posters and radio.

  8. Final Verification Success Story Using the Triad Approach at the Oak Ridge National Laboratory's Melton Valley Soils and Sediment Project

    International Nuclear Information System (INIS)

    King, D.A.; Haas, D.A.; Cange, J.B.

    2006-01-01

    The United States Environmental Protection Agency recently published guidance on the Triad approach, which supports the use of smarter, faster, and better technologies and work strategies during environmental site assessment, characterization, and cleanup. The Melton Valley Soils and Sediment Project (Project) at the Oak Ridge National Laboratory embraced this three-pronged approach to characterize contaminants in soil/sediment across the 1000-acre Melton Valley Watershed. Systematic Project Planning is the first of three prongs in the Triad approach. Management initiated Project activities by identifying key technical personnel, included regulators early in the planning phase, researched technologies, and identified available resources necessary to meet Project objectives. Dynamic Work Strategies is the second prong of the Triad approach. Core Team members, including State and Federal regulators, helped develop a Sampling and Analysis Plan that allowed experienced field managers to make real-time, in-the-field decisions and, thus, to adjust to conditions unanticipated during the planning phase. Real-time Measurement Technologies is the third and last prong of the Triad approach. To expedite decision-making, the Project incorporated multiple in-field technologies, including global positioning system equipment integrated with field screening instrumentation, magnetometers for utility clearance, and an on-site gamma spectrometer (spec) for rapid contaminant speciation and quantification. As a result of a relatively complex but highly efficient program, a Project field staff of eight collected approximately 1900 soil samples for on-site gamma spec analysis (twenty percent were also shipped for off-site analyses), 4.7 million gamma radiation measurements, 1000 systematic beta radiation measurements, and 3600 systematic dose rate measurements between July 1, 2004, and October 31, 2005. The site database previously contained results for less than 500 soil samples dating

  9. Improvement of tool support of the spatial approach to regional planning: problems, specifics, trends

    Directory of Open Access Journals (Sweden)

    Nataliya Gennadievna Yushkova

    2015-01-01

    Full Text Available The emerging imperatives of innovation economic development in Russia determine the content of conceptual and institutional constraints to the development of regional economic systems (RES. They consider the regional planning system as a leading priority in its inseparable unity with modern public administration tasks. However, the practice of development of long-term plans in the RF subjects proves that the innovation challenges of economic policy are not reflected properly in them or they are significantly distorted. The following reasons reduce the effectiveness of modernization processes in the RF subjects and hamper the appropriate reaction of RES on their impact: the lack of coordination between socio-economic and spatial regional plans, the imbalance of interaction between state authorities engaged in long-term planning, the lack of real prerequisites for the implementation of innovation initiatives in the regions. Systematization and analysis of long-term plans make it possible to substantiate the consistency of the spatial approach to regional planning expressed in the dominance of the transformational function that synchronizes the configuration and parameters of RES, and to establish ways to integrate spatial components in the system of regional planning through optimization of its tool support. The change in the content of the instrumentation support is based on the synthesis of the predominant basic characteristics of the existing tools used in isolated subsystems of regional planning of socio-economic and territorial development. The study has established a system of tool support for regional planning that adapts to the changes in both internal and external factors in the development of RES. Three main groups of tools: organizing, regulating, and coordinating are defined by their typing in accordance with the groups of management functions. The article proposes the modeling of combinations of tools that are subordinated to the

  10. Optimization approaches for robot trajectory planning

    Directory of Open Access Journals (Sweden)

    Carlos Llopis-Albert

    2018-03-01

    Full Text Available The development of optimal trajectory planning algorithms for autonomous robots is a key issue in order to efficiently perform the robot tasks. This problem is hampered by the complex environment regarding the kinematics and dynamics of robots with several arms and/or degrees of freedom (dof, the design of collision-free trajectories and the physical limitations of the robots. This paper presents a review about the existing robot motion planning techniques and discusses their pros and cons regarding completeness, optimality, efficiency, accuracy, smoothness, stability, safety and scalability.

  11. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  12. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  13. Better Forecasting for Better Planning: A Systems Approach.

    Science.gov (United States)

    Austin, W. Burnet

    Predictions and forecasts are the most critical features of rational planning as well as the most vulnerable to inaccuracy. Because plans are only as good as their forecasts, current planning procedures could be improved by greater forecasting accuracy. Economic factors explain and predict more than any other set of factors, making economic…

  14. A Spawn Mobile Agent Itinerary Planning Approach for Energy-Efficient Data Gathering in Wireless Sensor Networks.

    Science.gov (United States)

    Qadori, Huthiafa Q; Zulkarnain, Zuriati A; Hanapi, Zurina Mohd; Subramaniam, Shamala

    2017-06-03

    Mobile agent (MA), a part of the mobile computing paradigm, was recently proposed for data gathering in Wireless Sensor Networks (WSNs). The MA-based approach employs two algorithms: Single-agent Itinerary Planning (SIP) and Multi-mobile agent Itinerary Planning (MIP) for energy-efficient data gathering. The MIP was proposed to outperform the weakness of SIP by introducing distributed multi MAs to perform the data gathering task. Despite the advantages of MIP, finding the optimal number of distributed MAs and their itineraries are still regarded as critical issues. The existing MIP algorithms assume that the itinerary of the MA has to start and return back to the sink node. Moreover, each distributed MA has to carry the processing code (data aggregation code) to collect the sensory data and return back to the sink with the accumulated data. However, these assumptions have resulted in an increase in the number of MA's migration hops, which subsequently leads to an increase in energy and time consumption. In this paper, a spawn multi-mobile agent itinerary planning (SMIP) approach is proposed to mitigate the substantial increase in cost of energy and time used in the data gathering processes. The proposed approach is based on the agent spawning such that the main MA is able to spawn other MAs with different tasks assigned from the main MA. Extensive simulation experiments have been conducted to test the performance of the proposed approach against some selected MIP algorithms. The results show that the proposed SMIP outperforms the counterpart algorithms in terms of energy consumption and task delay (time), and improves the integrated energy-delay performance.

  15. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach.

    Science.gov (United States)

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-12-26

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  16. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    Directory of Open Access Journals (Sweden)

    Gabriele Ferri

    2015-12-01

    Full Text Available This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality, used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support. The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided

  17. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    Science.gov (United States)

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-01-01

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called Aη, is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  18. National plan for the accelerated commercialization of solar energy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    After a brief profile of the Mid-American region and characterization of the residential and commercial markets and the industry of the region, a short description is given of a regional planning meeting held for the purpose of preparing input for the Mid-American section of the National Program for the Accelerated Commercialization of Solar Energy (NPAC) Implementation plans. For each of thirty-eight programs, the objective, rationale, task statement/description, evaluation measures, and implementor are given. The programs are in these areas: public education/awareness; education/training; legislative/regulatory; performance/analysis; design/planning;demonstrations; state interface; technology; information dissemination; legal and regulatory; analysis and assessment; and regional coordination. Two policy statements are included - one on cratering a solar society and the other recommending the expansion of the commercialization to encompass and include the concepts of utilization and popularization in the plan for the advancement of solar energy. (LEW)

  19. Smart City Planning

    DEFF Research Database (Denmark)

    Ekman, Ulrik

    2018-01-01

    This article reflects on the challenges for urban planning posed by the emergence of smart cities in network societies. In particular, it reflects on reductionist tendencies in existing smart city planning. Here the concern is with the implications of prior reductions of complexity which have been...... undertaken by placing primacy in planning on information technology, economical profit, and top-down political government. Rather than pointing urban planning towards a different ordering of these reductions, this article argues in favor of approaches to smart city planning via complexity theory....... Specifically, this article argues in favor of approaching smart city plans holistically as topologies of organized complexity. Here, smart city planning is seen as a theory and practice engaging with a complex adaptive urban system which continuously operates on its potential. The actualizations in the face...

  20. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  1. Identifying Opportunities for Decision Support Systems in Support of Regional Resource Use Planning: An Approach Through Soft Systems Methodology.

    Science.gov (United States)

    Zhu; Dale

    2000-10-01

    / Regional resource use planning relies on key regional stakeholder groups using and having equitable access to appropriate social, economic, and environmental information and assessment tools. Decision support systems (DSS) can improve stakeholder access to such information and analysis tools. Regional resource use planning, however, is a complex process involving multiple issues, multiple assessment criteria, multiple stakeholders, and multiple values. There is a need for an approach to DSS development that can assist in understanding and modeling complex problem situations in regional resource use so that areas where DSSs could provide effective support can be identified, and the user requirements can be well established. This paper presents an approach based on the soft systems methodology for identifying DSS opportunities for regional resource use planning, taking the Central Highlands Region of Queensland, Australia, as a case study.

  2. Teaching Treatment Planning.

    Science.gov (United States)

    Seligman, Linda

    1993-01-01

    Describes approach to teaching treatment planning that author has used successfully in both seminars and graduate courses. Clarifies nature and importance of systematic treatment planning, then describes context in which treatment planning seems more effectively taught, and concludes with step-by-step plan for teaching treatment planning.…

  3. 77 FR 14416 - Notice of Availability of a Final Environmental Impact Statement and Final Environmental Impact...

    Science.gov (United States)

    2012-03-09

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) has prepared a Proposed California Desert Conservation Area (CDCA) Plan Amendment (PA)/Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Facility (OWEF) and by this notice is announcing the availability of the Proposed PA and Final EIS/EIR.

  4. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  5. A gentle introduction to epistemic planning: The DEL approach

    DEFF Research Database (Denmark)

    Bolander, Thomas

    2017-01-01

    Epistemic planning can be used for decision making in multi-agent situations with distributed knowledge and capabilities. Dynamic Epistemic Logic (DEL) has been shown to provide a very natural and expressive framework for epistemic planning. In this paper, we aim to give an accessible introduction...... to DEL-based epistemic planning. The paper starts with the most classical framework for planning, STRIPS, and then moves towards epistemic planning in a number of smaller steps, where each step is motivated by the need to be able to model more complex planning scenarios....

  6. Methodology development to support NPR strategic planning. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget

  7. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    Science.gov (United States)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize

  8. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  9. A decision support system for generation expansion planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Pereira, Adelino J.C.; Saraiva, Joao Tome

    2010-01-01

    This paper describes an approach to address the generation expansion-planning problem in order to help generation companies to decide whether to invest on new assets. This approach was developed in the scope of the implementation of electricity markets that eliminated the traditional centralized planning and lead to the creation of several generation companies competing for the delivery of power. As a result, this activity is more risky than in the past and so it is important to develop decision support tools to help generation companies to adequately analyse the available investment options in view of the possible behavior of other competitors. The developed model aims at maximizing the expected revenues of a generation company while ensuring the safe operation of the power system and incorporating uncertainties related with price volatility, with the reliability of generation units, with the demand evolution and with investment and operation costs. These uncertainties are modeled by pdf functions and the solution approach is based on Genetic Algorithms. Finally, the paper includes a Case Study to illustrate the application and interest of the developed approach. (author)

  10. A decision support system for generation expansion planning in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Adelino J.C. [Departamento de Engenharia Electrotecnica, Instituto Superior de Engenharia de Coimbra, Instituto Politecnico de Coimbra, Rua Pedro Nunes, 3030-199 Coimbra (Portugal); Saraiva, Joao Tome [INESC Porto and Departamento de Engenharia Electrotecnica e Computadores, Faculdade de Engenharia da Universidade do Porto, Campus da FEUP, Rua Dr. Roberto Frias, 4200-465 Porto (Portugal)

    2010-07-15

    This paper describes an approach to address the generation expansion-planning problem in order to help generation companies to decide whether to invest on new assets. This approach was developed in the scope of the implementation of electricity markets that eliminated the traditional centralized planning and lead to the creation of several generation companies competing for the delivery of power. As a result, this activity is more risky than in the past and so it is important to develop decision support tools to help generation companies to adequately analyse the available investment options in view of the possible behavior of other competitors. The developed model aims at maximizing the expected revenues of a generation company while ensuring the safe operation of the power system and incorporating uncertainties related with price volatility, with the reliability of generation units, with the demand evolution and with investment and operation costs. These uncertainties are modeled by pdf functions and the solution approach is based on Genetic Algorithms. Finally, the paper includes a Case Study to illustrate the application and interest of the developed approach. (author)

  11. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    International Nuclear Information System (INIS)

    Feng, W.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  12. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    Energy Technology Data Exchange (ETDEWEB)

    Feng, W. [New York Presbyterian Hospital (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  13. Analyzing an Integrated Planning Approach Among Planning Scale and Sector A Case Study of Malang City’s Vision as The City of Education

    Directory of Open Access Journals (Sweden)

    Akhmad Amirudin

    2014-04-01

    Full Text Available Integrated planning is more needed by government today because of the complexity of problems and limited resources. Integrated planning can undertake the problems by giving comprehensive solution and provide how much resources are needed to reach the goal. Integrated planning approach is implied to provide better tools to guide actions towards the development of cities, improvement of human conditions, and ultimately a better urbanism. So the research focused on integrated planning in Malang City based on Malang City’s vision, strategic planning, operational planning, budgeting planning in Malang City to achieve Malang City’s vision as the city of Education. In this study, researcher used qualitative method with descriptive research, which is a research process aims to describe the exact nature / something happened and took place on the research conducted. The research purpose is to identify and describe and analyze the process of Malang City Planning Agency integrate other planning scale and sector in developing planning; and to identify, describe and analyze the process of Malang City Planning Agency integrated all stakeholders in Integrated Planning process. This research use descriptive research method. The reason to use descriptive research method in this study because the principle objectives of this study aimed to describe, illustrate in a systematic, factual and accurate statement of the facts and the relationship between phenomenon. Then qualitative method was directed at the individual's background and a holistic (whole. So in this case should not isolate the individual or organization into a variable or hypothesis, but should view it as part of wholeness. The result of this research in the case study of Malang City has shown thatThe case study of Malang City showed that various sectors recognized but did not pay much attention to Malang City’s vision as City of Education in their plans; however, Regional Mid-term Development

  14. SU-F-J-105: Towards a Novel Treatment Planning Pipeline Delivering Pareto- Optimal Plans While Enabling Inter- and Intrafraction Plan Adaptation

    Energy Technology Data Exchange (ETDEWEB)

    Kontaxis, C; Bol, G; Lagendijk, J; Raaymakers, B [University Medical Center Utrecht, Utrecht (Netherlands); Breedveld, S; Sharfo, A; Heijmen, B [Erasmus University Medical Center Rotterdam, Rotterdam (Netherlands)

    2016-06-15

    Purpose: To develop a new IMRT treatment planning methodology suitable for the new generation of MR-linear accelerator machines. The pipeline is able to deliver Pareto-optimal plans and can be utilized for conventional treatments as well as for inter- and intrafraction plan adaptation based on real-time MR-data. Methods: A Pareto-optimal plan is generated using the automated multicriterial optimization approach Erasmus-iCycle. The resulting dose distribution is used as input to the second part of the pipeline, an iterative process which generates deliverable segments that target the latest anatomical state and gradually converges to the prescribed dose. This process continues until a certain percentage of the dose has been delivered. Under a conventional treatment, a Segment Weight Optimization (SWO) is then performed to ensure convergence to the prescribed dose. In the case of inter- and intrafraction adaptation, post-processing steps like SWO cannot be employed due to the changing anatomy. This is instead addressed by transferring the missing/excess dose to the input of the subsequent fraction. In this work, the resulting plans were delivered on a Delta4 phantom as a final Quality Assurance test. Results: A conventional static SWO IMRT plan was generated for two prostate cases. The sequencer faithfully reproduced the input dose for all volumes of interest. For the two cases the mean relative dose difference of the PTV between the ideal input and sequenced dose was 0.1% and −0.02% respectively. Both plans were delivered on a Delta4 phantom and passed the clinical Quality Assurance procedures by achieving 100% pass rate at a 3%/3mm gamma analysis. Conclusion: We have developed a new sequencing methodology capable of online plan adaptation. In this work, we extended the pipeline to support Pareto-optimal input and clinically validated that it can accurately achieve these ideal distributions, while its flexible design enables inter- and intrafraction plan

  15. SU-F-J-105: Towards a Novel Treatment Planning Pipeline Delivering Pareto- Optimal Plans While Enabling Inter- and Intrafraction Plan Adaptation

    International Nuclear Information System (INIS)

    Kontaxis, C; Bol, G; Lagendijk, J; Raaymakers, B; Breedveld, S; Sharfo, A; Heijmen, B

    2016-01-01

    Purpose: To develop a new IMRT treatment planning methodology suitable for the new generation of MR-linear accelerator machines. The pipeline is able to deliver Pareto-optimal plans and can be utilized for conventional treatments as well as for inter- and intrafraction plan adaptation based on real-time MR-data. Methods: A Pareto-optimal plan is generated using the automated multicriterial optimization approach Erasmus-iCycle. The resulting dose distribution is used as input to the second part of the pipeline, an iterative process which generates deliverable segments that target the latest anatomical state and gradually converges to the prescribed dose. This process continues until a certain percentage of the dose has been delivered. Under a conventional treatment, a Segment Weight Optimization (SWO) is then performed to ensure convergence to the prescribed dose. In the case of inter- and intrafraction adaptation, post-processing steps like SWO cannot be employed due to the changing anatomy. This is instead addressed by transferring the missing/excess dose to the input of the subsequent fraction. In this work, the resulting plans were delivered on a Delta4 phantom as a final Quality Assurance test. Results: A conventional static SWO IMRT plan was generated for two prostate cases. The sequencer faithfully reproduced the input dose for all volumes of interest. For the two cases the mean relative dose difference of the PTV between the ideal input and sequenced dose was 0.1% and −0.02% respectively. Both plans were delivered on a Delta4 phantom and passed the clinical Quality Assurance procedures by achieving 100% pass rate at a 3%/3mm gamma analysis. Conclusion: We have developed a new sequencing methodology capable of online plan adaptation. In this work, we extended the pipeline to support Pareto-optimal input and clinically validated that it can accurately achieve these ideal distributions, while its flexible design enables inter- and intrafraction plan

  16. Lazy Toggle PRM: A single-query approach to motion planning

    KAUST Repository

    Denny, Jory

    2013-05-01

    Probabilistic RoadMaps (PRMs) are quite suc-cessful in solving complex and high-dimensional motion plan-ning problems. While particularly suited for multiple-query scenarios and expansive spaces, they lack efficiency in both solving single-query scenarios and mapping narrow spaces. Two PRM variants separately tackle these gaps. Lazy PRM reduces the computational cost of roadmap construction for single-query scenarios by delaying roadmap validation until query time. Toggle PRM is well suited for mapping narrow spaces by mapping both Cfree and Cobst, which gives certain theoretical benefits. However, fully validating the two resulting roadmaps can be costly. We present a strategy, Lazy Toggle PRM, for integrating these two approaches into a method which is both suited for narrow passages and efficient single-query calculations. This simultaneously addresses two challenges of PRMs. Like Lazy PRM, Lazy Toggle PRM delays validation of roadmaps until query time, but if no path is found, the algorithm augments the roadmap using the Toggle PRM methodology. We demonstrate the effectiveness of Lazy Toggle PRM in a wide range of scenarios, including those with narrow passages and high descriptive complexity (e.g., those described by many triangles), concluding that it is more effective than existing methods in solving difficult queries. © 2013 IEEE.

  17. Multimodal Logistics Network Design over Planning Horizon through a Hybrid Meta-Heuristic Approach

    Science.gov (United States)

    Shimizu, Yoshiaki; Yamazaki, Yoshihiro; Wada, Takeshi

    Logistics has been acknowledged increasingly as a key issue of supply chain management to improve business efficiency under global competition and diversified customer demands. This study aims at improving a quality of strategic decision making associated with dynamic natures in logistics network optimization. Especially, noticing an importance to concern with a multimodal logistics under multiterms, we have extended a previous approach termed hybrid tabu search (HybTS). The attempt intends to deploy a strategic planning more concretely so that the strategic plan can link to an operational decision making. The idea refers to a smart extension of the HybTS to solve a dynamic mixed integer programming problem. It is a two-level iterative method composed of a sophisticated tabu search for the location problem at the upper level and a graph algorithm for the route selection at the lower level. To keep efficiency while coping with the resulting extremely large-scale problem, we invented a systematic procedure to transform the original linear program at the lower-level into a minimum cost flow problem solvable by the graph algorithm. Through numerical experiments, we verified the proposed method outperformed the commercial software. The results indicate the proposed approach can make the conventional strategic decision much more practical and is promising for real world applications.

  18. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  19. 77 FR 74688 - Final Recovery Plan, First Revision; Mexican Spotted Owl

    Science.gov (United States)

    2012-12-17

    ... Arizona, Colorado, New Mexico, Texas, and Utah, and south through the Sierra Madre Occidental and Sierra... plants. ADDRESSES: If you wish to view the recovery plan, you may obtain a copy by any one of the... recovery plan. Background Recovery of endangered or threatened animals and plants to the point where they...

  20. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  1. Eco and Green cities as new approaches for planning and developing cities in Egy

    Directory of Open Access Journals (Sweden)

    Hosam K. El Ghorab

    2016-03-01

    This paper will introduce the first practice in planning and developing Green and Eco new city in Egypt (located at Eastern Desert, Sohaj governorate, on the corridor of Upper Egypt⧹Red Sea, including elaboration of its urban structure, land use and its green systems which produce most of its needed infrastructure (specially electricity power network, integrated sewage and solid waste management systems without making any pressures on the national and local existing infrastructure systems. Finally, the paper will conclude lessons learned from the introduced practice, and present recommendations to improve Egyptian cities and make it more sustainable.

  2. Setup planning for machining

    CERN Document Server

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  3. Electric utility system planning studies for OTEC power integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  4. Narrative Finality

    Directory of Open Access Journals (Sweden)

    Armine Kotin Mortimer

    1981-01-01

    Full Text Available The cloturai device of narration as salvation represents the lack of finality in three novels. In De Beauvoir's Tous les hommes sont mortels an immortal character turns his story to account, but the novel makes a mockery of the historical sense by which men define themselves. In the closing pages of Butor's La Modification , the hero plans to write a book to save himself. Through the thrice-considered portrayal of the Paris-Rome relationship, the ending shows the reader how to bring about closure, but this collective critique written by readers will always be a future book. Simon's La Bataille de Pharsale , the most radical attempt to destroy finality, is an infinite text. No new text can be written. This extreme of perversion guarantees bliss (jouissance . If the ending of De Beauvoir's novel transfers the burden of non-final world onto a new victim, Butor's non-finality lies in the deferral to a future writing, while Simon's writer is stuck in a writing loop, in which writing has become its own end and hence can have no end. The deconstructive and tragic form of contemporary novels proclaims the loss of belief in a finality inherent in the written text, to the profit of writing itself.

  5. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  6. The European cooperative approach to securing critical information infrastructure.

    Science.gov (United States)

    Purser, Steve

    2011-10-01

    This paper provides an overview of the EU approach to securing critical information infrastructure, as defined in the Action Plan contained in the Commission Communication of March 2009, entitled 'Protecting Europe from large-scale cyber-attacks and disruptions: enhancing preparedness, security and resilience' and further elaborated by the Communication of May 2011 on critical Information infrastructure protection 'Achievements and next steps: towards global cyber-security'. After explaining the need for pan-European cooperation in this area, the CIIP Action Plan is explained in detail. Finally, the current state of progress is summarised together with the proposed next steps.

  7. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  8. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  9. The Theory of Planned Behaviour: Predicting Pre-Service Teachers' Teaching Behaviour towards a Constructivist Approach

    Science.gov (United States)

    Wang, Carrie Lijuan; Ha, Amy S.

    2013-01-01

    The two-pronged purpose of this study is to examine factors determining the teaching behaviour of pre-service physical education (PE) teachers towards a constructivist approach, likewise referred to as teaching games for understanding (TGfU). Theory of planned behaviour (TPB) was applied to guide the formulation of research purpose and design. Six…

  10. Administration by Objectives: A Systematic Approach to Educational Planning in Virginia. Report of a Study.

    Science.gov (United States)

    Holmes, George W., III; Seawell, William H.

    This report presents (1) details of a program for educational administration by objectives and (2) the results of such a program developed by the Virginia State Department of Education to upgrade the quality of education in the public schools of that State. Administration by objectives is a systematic approach to education planning using…

  11. 76 FR 57100 - Natural Resource Plan

    Science.gov (United States)

    2011-09-15

    ... TENNESSEE VALLEY AUTHORITY Natural Resource Plan AGENCY: Tennessee Valley Authority (TVA). ACTION... environmental impact statement (EIS) for the Natural Resource Plan (NRP). The notice of availability of the Final Environmental Impact Statement for the Natural Resource Plan was published in the Federal Register...

  12. Strategic Planning Approaches for Creating Resilient Cities: A Case Study on Hangzhou City

    Institute of Scientific and Technical Information of China (English)

    Liu; Dan; Hua; Chen

    2015-01-01

    In the twenty-first century, the population in China will be increasingly urbanized – focusing the sustainability challenge on cities and raising new challenges to address the urban resilience capacity. During the past two decades, China’s urban policies are state institution-directed, growth-oriented, and land-based, imposing unprecedented challenges on sustainability. Strengthening the capacity of cities to manage resilience appears to be a key factor for cities to effectively pursue sustainable development. The aim of this paper is to explore strategic planning approaches for creating resilient cities in China through a study on Hangzhou City in an integrated framework. Firstly, the paper gives a systematic insight into the structure of Hangzhou City. Secondly, the development trajectory of the urban system is analyzed to understand how the past has shaped the present and to get a broader perspective on its evolution. Thirdly, scenario planning is conducted to explore the adaptive capacity of Hangzhou City under different future conditions. At last, having analyzed the past, present, and future of the urban system, the paper discusses the strategies for resilient planning, which helps to identify factors and trends that might enhance or inhabit the adaptability.

  13. Using a Service Planning Approach to Improve the Impact of Earth Observations in the Developing World

    Science.gov (United States)

    Irwin, D.; Frankel-Reed, J.

    2017-12-01

    SERVIR is joint development initiative of the National Aeronautics and Space Administration (NASA) and the United States Agency for International Development (USAID), working in partnership with leading regional organizations around the world to help developing countries use information provided by Earth observing satellites and geospatial technologies to empower decision-makers with tools, products, and services to better address critical issues related to food security, water resources, natural disasters, and land use. Since its launch in 2005, SERVIR has grown into a global network of four active hubs that are improving awareness, increasing access to information, and supporting analysis to help people in Africa, Hindu Kush Himalaya, and the Lower Mekong regions better manage today's complex environmental challenges. To help improve the impact of SERVIR activities throughout the global network, a Service Planning Approach was developed with three main steps that involve: 1) consultation and needs assessment, 2) service design and 3) service delivery. To successfully accomplish these steps, SERVIR has created a series of capacity building tools that focus on specific activities to better engage stakeholders, design a more successful service, and to conduct end-to-end monitoring, evaluation, and learning. Currently, all four SERVIR hubs in different regions of the world are implementing this Service Planning Approach and helping to improve it by providing feedback based on their implementation. This presentation will describe the SERVIR Service Planning Approach and discuss the various tools, which ultimately can empower remote sensing scientists and application developers to obtain a greater impact from the Earth Observation products they develop.

  14. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  15. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  16. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant (PFP); FINAL

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  17. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  18. Practical planning extending the classical AI planning paradigm

    CERN Document Server

    Wilkins, David E

    2014-01-01

    Planning, or reasoning about actions, is a fundamental element of intelligent behavior--and one that artificial intelligence has found very difficult to implement. The most well-understood approach to building planning systems has been under refinement since the late 1960s and has now reached a level of maturity where there are good prospects for building working planners. Practical Planning is an in-depth examination of this classical planning paradigm through an intensive case study of SIPE, a significantly implemented planning system. The author, the developer of SIPE, defines the plann

  19. SU-E-T-521: Feasibility Study of a Rotational Step-And-Shoot IMRT Treatment Planning Approach

    International Nuclear Information System (INIS)

    Zhu, X; Chang, S; Cullip, T; Yuan, L; Zhang, X; Lian, J; Tang, X; Tracton, G; Dooley, J

    2014-01-01

    Purpose: Rotational step-and-shot IMRT (r-IMRT) could improve delivery efficiency with good dose conformity, especially if it can leverage the burst mode of the accelerator where radiation is turned on/off momentarily while the gantry rotates continuously. The challenge for the r-IMRT planning is to minimize the number of beams to achieve a fast and smooth rotational delivery. Methods: Treatment plans for r-IMRT were created using an in-house treatment planning system. To generate the plan using a very few beams, gantry angle was optimized by weighting the beam monitoring unit (MU), and beam shape optimization was a combination of column search with k-means clustering. A prostate case and a head and neck case were planned using r-IMRT. The dosimetry is compared to s-IMRT planned with Varian Eclipse treatment planning system. Results: With the same PTV dose coverage D95=100%, the r-IMRT plans shows comparable sparing as the s-IMRT plans in the prostate for the rectum D10cc and the bladder Dmean, and in the head and neck for the spinal cord Dmax, the brain stem Dmax, the left/right parotid Dmean, the larynx Dmean, and the mandible Dmean. Both plans meet the established institutional clinical dosimetric criteria. The r-IMRT plan uses 19 beam/405 MU for the prostate, and 68 beam/880 MU for the head and neck, while the s-IMRT uses 7 beam/724 MU and 9 beam/1812 MU, respectively. Compared to the corresponding s-IMRT, r-IMRT has a reduction of MUs of 44% for the prostate case and 41% for the head and neck case. Conclusions: We have demonstrated the feasibility of a rotational step and shoot IMRT treatment planning approach that significantly shortens the conventional IMRT treatment beam-on time without degrading the dose comformity

  20. SU-E-T-521: Feasibility Study of a Rotational Step-And-Shoot IMRT Treatment Planning Approach

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X [Univ. of North Carolina at Chapel Hill, Chapel Hill, NC (United States); Chang, S [UNC School of Medicine, Chapel Hill, NC (United States); Cullip, T [UNC Hospitals, Chapel Hill, NC (United States); Yuan, L; Zhang, X [Duke University, Durham, NC (United States); Lian, J; Tang, X [UniversityNorth Carolina, Chapel Hill, NC (United States); Tracton, G; Dooley, J [University of North Carolina, Chapel Hill, NC (United States)

    2014-06-01

    Purpose: Rotational step-and-shot IMRT (r-IMRT) could improve delivery efficiency with good dose conformity, especially if it can leverage the burst mode of the accelerator where radiation is turned on/off momentarily while the gantry rotates continuously. The challenge for the r-IMRT planning is to minimize the number of beams to achieve a fast and smooth rotational delivery. Methods: Treatment plans for r-IMRT were created using an in-house treatment planning system. To generate the plan using a very few beams, gantry angle was optimized by weighting the beam monitoring unit (MU), and beam shape optimization was a combination of column search with k-means clustering. A prostate case and a head and neck case were planned using r-IMRT. The dosimetry is compared to s-IMRT planned with Varian Eclipse treatment planning system. Results: With the same PTV dose coverage D95=100%, the r-IMRT plans shows comparable sparing as the s-IMRT plans in the prostate for the rectum D10cc and the bladder Dmean, and in the head and neck for the spinal cord Dmax, the brain stem Dmax, the left/right parotid Dmean, the larynx Dmean, and the mandible Dmean. Both plans meet the established institutional clinical dosimetric criteria. The r-IMRT plan uses 19 beam/405 MU for the prostate, and 68 beam/880 MU for the head and neck, while the s-IMRT uses 7 beam/724 MU and 9 beam/1812 MU, respectively. Compared to the corresponding s-IMRT, r-IMRT has a reduction of MUs of 44% for the prostate case and 41% for the head and neck case. Conclusions: We have demonstrated the feasibility of a rotational step and shoot IMRT treatment planning approach that significantly shortens the conventional IMRT treatment beam-on time without degrading the dose comformity.

  1. Plans for Managing Hanford Remote Handled Transuranic (TRU) Waste

    International Nuclear Information System (INIS)

    MCKENNEY, D.E.

    2001-01-01

    The current Hanford Site baseline and life-cycle waste forecast predicts that approximately 1,000 cubic meters of remote-handled transuranic (RH-TRU) waste will be generated by waste management and environmental restoration activities at Hanford. These 1,000 cubic meters, comprised of both transuranic and mixed transuranic (TRUM) waste, represent a significant portion of the total estimated inventory of RH-TRU to be disposed of at the Waste Isolation Pilot Plant (WIPP). A systems engineering approach is being followed to develop a disposition plan for each RH-TRU/TRUM waste stream at Hanford. A number of significant decision-making efforts are underway to develop and finalize these disposition plans, including: development and approval of a RH-TRU/TRUM Waste Project Management Plan, revision of the Hanford Waste Management Strategic Plan, the Hanford Site Options Study (''Vision 2012''), the Canyon Disposal Initiative Record-of-Decision, and the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (SW-EIS). Disposition plans may include variations of several options, including (1) sending most RH-TRU/TRUM wastes to WIPP, (2) deferrals of waste disposal decisions in the interest of both efficiency and integration with other planned decision dates and (3) disposition of some materials in place consistent with Department of Energy Orders and the regulations in the interest of safety, risk minimization, and cost. Although finalization of disposition paths must await completion of the aforementioned decision documents, significant activities in support of RH-TRU/TRUM waste disposition are proceeding, including Hanford participation in development of the RH TRU WIPP waste acceptance criteria, preparation of T Plant for interim storage of spent nuclear fuel sludge, sharing of technology information and development activities in cooperation with the Mixed Waste Focus Area, RH-TRU technology demonstrations and deployments, and

  2. Sustainable Planning Approaches for Water Resources: Case Studies

    OpenAIRE

    Samuel, Asumadu-Sarkodie

    2017-01-01

    Lake Okeechobee, Florida Louisiana's Comprehensive Master Plan for a Sustainable Coast Restoration Planning Process for the Gulf Coast. This record was migrated from the OpenDepot repository service in June, 2017 before shutting down.

  3. College Seniors' Plans for Graduate School: Do Deep Approaches Learning and Holland Academic Environments Matter?

    Science.gov (United States)

    Rocconi, Louis M.; Ribera, Amy K.; Nelson Laird, Thomas F.

    2015-01-01

    This study examines the extent to which college seniors' plans for graduate school are related to their tendency to engage in deep approaches to learning (DAL) and their academic environments (majors) as classified by Holland type. Using data from the National Survey of Student Engagement, we analyzed responses from over 116,000 seniors attending…

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  5. Sustainable resource planning in energy markets

    International Nuclear Information System (INIS)

    Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei

    2014-01-01

    Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method

  6. Structuring a Multiproduct Sales Quota-Bonus Plan for a Heterogeneous Sales Force: A Practical Model-Based Approach

    OpenAIRE

    Murali K. Mantrala; Prabhakant Sinha; Andris A. Zoltners

    1994-01-01

    This paper presents an agency theoretic model-based approach that assists sales managers in determining the profit-maximizing structure of a common multiproduct sales quota-bonus plan for a geographically specialized heterogeneous sales force operating in a repetitive buying environment. This approach involves estimating each salesperson's utility function for income and effort and using these models to predict individual sales achievements and the associated aggregate profit for the firm und...

  7. Beyond Housing First: Essential Elements of a System-Planning Approach to Ending Homelessness

    Directory of Open Access Journals (Sweden)

    Alina Turner

    2014-10-01

    Full Text Available The concept of “Housing First” has taken on a powerful status in the complex of government, non-profit and academic systems that study and seek to eliminate homelessness. It is a compelling concept, in that it has brought our society to the realization that housing instability itself is often the culmination of various underlying and intersecting issues, ranging from mental health and addiction issues to domestic abuse and poverty. The “Housing First” principle holds that homeless individuals stand a far poorer chance of improving their condition while they remain homeless; that the stability of a permanent home provides the foundation that allows individuals to begin addressing the issues that led to their housing instability in the first place. However, the elegance of the fundamental principle behind “Housing First” also risks creating an illusion, wherein agencies and governments might too easily conclude that the entirety of this approach to ending homelessness is merely to begin housing the homeless. While that is a step in the process, it is but a piece of the Housing First approach. And unless all the various elements of the approach are also included in the actual work done on the ground, the success observed so far in communities that have tried the Housing First approach will not necessarily be replicated. This can lead to disappointment for those trying to implement new strategies, undermine the effectiveness of Housing First, and most importantly, fail to fully help those individuals in need. Housing First encompasses a strategic application of key principles across the entire homeless-serving system. When it is introduced into a new jurisdiction, it must be accompanied by an overhaul of the current approach to social policy and service delivery. The implementation of Housing First requires a difficult and systematic process, beginning with planning and strategy development that recognizes how every part of the homeless

  8. Safeguards for final disposal of spent nuclear fuel. Methods and technologies for the Olkiluoto site

    International Nuclear Information System (INIS)

    Okko, O.

    2003-05-01

    The final disposal of the nuclear material shall introduce new safeguards concerns which have not been addressed previously in IAEA safeguards approaches for spent fuel. The encapsulation plant to be built at the site will be the final opportunity for verification of spent fuel assemblies prior to their transfer to the geological repository. Moreover, additional safety and safeguards measures are considered for the underground repository. Integrated safeguards verification systems will also concentrate on environmental monitoring to observe unannounced activities related to possible diversion schemes at the repository site. The final disposal of spent nuclear fuel in geological formation will begin in Finland within 10 years. After the geological site investigations and according to legal decision made in 2001, the final repository of the spent nuclear fuel shall be located at the Olkiluoto site in Eurajoki. The next phase of site investigations contains the construction of an underground facility, called ONKALO, for rock characterisation purposes. The excavation of the ONKALO is scheduled to start in 2004. Later on, the ONKALO may form a part of the final repository. The plans to construct the underground facility for nuclear material signify that the first safeguards measures, e.g. baseline mapping of the site area, need to take prior to the excavation phase. In order to support the development and implementation of the regulatory control of the final disposal programme, STUK established an independent expert group, LOSKA. The group should support the STUK in the development of the technical safeguards requirements, in the implementation of the safeguards and in the evaluation of the plans of the facility operator. This publication includes four background reports produced by this group. The first of these 'NDA verification of spent fuel, monitoring of disposal canisters, interaction of the safeguards and safety issues in the final disposal' describes the new

  9. 5 CFR 330.602 - Agency plans.

    Science.gov (United States)

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS RECRUITMENT, SELECTION, AND... Employees § 330.602 Agency plans. (a) Each agency will establish a Career Transition Assistance Plan (CTAP) to actively assist its surplus and displaced employees. A copy of the final plan and any additional...

  10. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  11. ASME nuclear codes and standards risk management strategic planning

    International Nuclear Information System (INIS)

    Hill, Ralph S. III; Balkey, Kenneth R.; Erler, Bryan A.; Wesley Rowley, C.

    2007-01-01

    This paper is prepared in honor and in memory of the late Professor Emeritus Yasuhide Asada to recognize his contributions to ASME Nuclear Codes and Standards initiatives, particularly those related to risk-informed technology and System Based Code developments. For nearly two decades, numerous risk-informed initiatives have been completed or are under development within the ASME Nuclear Codes and Standards organization. In order to properly manage the numerous initiatives currently underway or planned for the future, the ASME Board on Nuclear Codes and Standards (BNCS) has an established Risk Management Strategic Plan (Plan) that is maintained and updated by the ASME BNCS Risk Management Task Group. This paper presents the latest approved version of the plan beginning with a background of applications completed to date, including the recent probabilistic risk assessment (PRA) standards developments for nuclear power plant applications. The paper discusses planned applications within ASME Nuclear Codes and Standards that will require expansion of the ASME PRA Standard to support new advanced light water reactor and next generation reactor developments, such as for high temperature gas-cooled reactors. Emerging regulatory developments related to risk-informed, performance- based approaches are summarized. A long-term vision for the potential development and evolution to a nuclear systems code that adopts a risk-informed approach across a facility life-cycle (design, construction, operation, maintenance, and closure) is also summarized. Finally, near term and long term actions are defined across the ASME Nuclear Codes and Standards organizations related to risk management, including related U.S. regulatory activities. (author)

  12. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  13. Ethical aspects of final disposal. Final report

    International Nuclear Information System (INIS)

    Baltes, B.; Leder, W.; Achenbach, G.B.; Spaemann, R.; Gerhardt, V.

    2003-01-01

    In fulfilment of this task the Federal Environmental Ministry has commissioned GRS to summarise the current national and international status of ethical aspects of the final disposal of radioactive wastes as part of the project titled ''Final disposal of radioactive wastes as seen from the viewpoint of ethical objectives''. The questions arising from the opinions, positions and publications presented in the report by GRS were to serve as a basis for an expert discussion or an interdisciplinary discussion forum for all concerned with the ethical aspects of an answerable approach to the final disposal of radioactive wastes. In April 2001 GRS held a one-day seminar at which leading ethicists and philosophers offered statements on the questions referred to above and joined in a discussion with experts on issues of final disposal. This report documents the questions that arose ahead of the workshop, the specialist lectures held there and a summary of the discussion results [de

  14. Africa takes a more male-friendly approach to family planning.

    Science.gov (United States)

    Omuodo, D O

    1996-12-01

    It has been demonstrated that men are more likely to support family planning (FP) and to use a method themselves if services and educational programs are targeted to them. Because men fear that contraception reduces their control over their wives' sexuality, male-friendly approaches can enhance gender equality in reproductive health decisions. In Togo, the media is being used to encourage positive attitudes towards FP in specific male groups. In Ghana, FP services targeted to men have resulted in increased male involvement. In Swaziland, male audiences are targeted with FP education. In Sierra Leone, men have met in groups to learn about how to prevent sexually transmitted diseases and about the benefits of FP, and in Kenya, three male-only clinics exist to provide FP services to men.

  15. Health Workforce Planning

    Science.gov (United States)

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  16. Sustainable cities: challenges of an integrated planning approach

    NARCIS (Netherlands)

    Nijkamp, Peter; Geenhuizen, van Marina

    1995-01-01

    This paper will identify specific planning conditions that arise when planning aims at sustainable development. First, attention will be paid tosocio-ethical attitudes toward sustainability issues and to the reasons why much of the sustainability debate deserves an urban focus. Then,

  17. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. Planning additional drilling campaign using two-space genetic algorithm: A game theoretical approach

    Science.gov (United States)

    Kumral, Mustafa; Ozer, Umit

    2013-03-01

    Grade and tonnage are the most important technical uncertainties in mining ventures because of the use of estimations/simulations, which are mostly generated from drill data. Open pit mines are planned and designed on the basis of the blocks representing the entire orebody. Each block has different estimation/simulation variance reflecting uncertainty to some extent. The estimation/simulation realizations are submitted to mine production scheduling process. However, the use of a block model with varying estimation/simulation variances will lead to serious risk in the scheduling. In the medium of multiple simulations, the dispersion variances of blocks can be thought to regard technical uncertainties. However, the dispersion variance cannot handle uncertainty associated with varying estimation/simulation variances of blocks. This paper proposes an approach that generates the configuration of the best additional drilling campaign to generate more homogenous estimation/simulation variances of blocks. In other words, the objective is to find the best drilling configuration in such a way as to minimize grade uncertainty under budget constraint. Uncertainty measure of the optimization process in this paper is interpolation variance, which considers data locations and grades. The problem is expressed as a minmax problem, which focuses on finding the best worst-case performance i.e., minimizing interpolation variance of the block generating maximum interpolation variance. Since the optimization model requires computing the interpolation variances of blocks being simulated/estimated in each iteration, the problem cannot be solved by standard optimization tools. This motivates to use two-space genetic algorithm (GA) approach to solve the problem. The technique has two spaces: feasible drill hole configuration with minimization of interpolation variance and drill hole simulations with maximization of interpolation variance. Two-space interacts to find a minmax solution

  19. Technical approach document

    International Nuclear Information System (INIS)

    1988-04-01

    This document describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPS standards. This document is a revision to the original document. Major revisions were made to the sections in riprap selection and sizing, and ground-water; only minor revisions were made to the remainder of the document. The US Nuclear Regulatory Commission (NRC) has prepared a Standard Review Plan (NRC-SRP) which describes factors to be considered by the NRC in approving the RAP. Sections 3.0, 4.0, 5.0, and 7.0 of this document are arranged under the same headings as those used in the NRC-SRP. This approach is adopted in order to facilitate joint use of the documents. Section 2.0 (not included in the NRC-SRP) discusses design considerations; Section 3.0 describes surface-water hydrology and erosion control; Section 4.0 describes geotechnical aspects of pile design; Section 5.0 discusses the Alternate Site Selection Process; Section 6.0 deals with radiological issues (in particular, the design of the radon barrier); Section 7.0 discusses protection of groundwater resources; and Section 8.0 discusses site design criteria for the RAC

  20. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-05-02

    ... Vaughn Road, Brecksville, Ohio 44141. The document is also available on the internet at the NPS Planning... paddling and parking areas, and guidance for the restoration and sustainability of the trail system for the...

  1. Quality assurance plan for placement of cold-cap grout, demonstration vault, Hanford Grout Vault Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Harrington, P.T.; Wakeley, L.D.; Ernzen, J.J.; Walley, D.M.

    1992-08-01

    During FY 91, the U.S. Army Engineer Waterways Experiment Station (WES) developed a grout to be used as a cold cap, a nonradioactive layer, between the solidified waste and the cover blocks of a demonstration waste disposal vault at the U.S. Department of Energy Hanford Facility. This document recommends requirements for a quality assurance (QA) plan for field mixing and placing of the cold-cap grout during final closure of the demonstration vault. Preplacement activities emphasize selection and testing of materials that will match the performance of materials used in the WES grout. Materials sources and applicable American Society of Testing and Materials, American Concrete Institute, and American Petroleum Institute specifications and requirements are provided. Archiving of physical samples of materials is essential, in addition to careful maintenance of test reports and laboratory data. Full-scale field trial mixing and a detailed preconstruction conference are recommended. Placement activities focus on production and placement of a grout that remains sufficiently constant throughout all batches and meets performance requirements. QA activities must be coordinated between the batch plant and delivery site. Recommended sampling during placement includes cylinders cast for subsequent tests of compressive strength and for nondestructive evaluation and prisms cast for monitoring volume stability. A minimum of two lifts is recommended. Postplacement activities include long-term monitoring of the properties of grout specimens cast during placement. Minimum testing of cylinders includes pulse velocity, fundamental frequency, and unconfined compressive strength. Monitoring characteristics of the microstructure also are recommended. The QA plan should designate an organization to have responsibility for maintaining complete records, reports, and archived samples, including details of deviations from plans written before field placement.

  2. Methods and approaches to support Indigenous water planning: An example from the Tiwi Islands, Northern Territory, Australia

    Science.gov (United States)

    Hoverman, Suzanne; Ayre, Margaret

    2012-12-01

    SummaryIndigenous land owners of the Tiwi Islands, Northern Territory Australia have begun the first formal freshwater allocation planning process in Australia entirely within Indigenous lands and waterways. The process is managed by the Northern Territory government agency responsible for water planning, the Department of Natural Resources, Environment, The Arts and Sport, in partnership with the Tiwi Land Council, the principal representative body for Tiwi Islanders on matters of land and water management and governance. Participatory planning methods ('tools') were developed to facilitate community participation in Tiwi water planning. The tools, selected for their potential to generate involvement in the planning process needed both to incorporate Indigenous knowledge of water use and management and raise awareness in the Indigenous community of Western science and water resources management. In consultation with the water planner and Tiwi Land Council officers, the researchers selected four main tools to develop, trial and evaluate. Results demonstrate that the tools provided mechanisms which acknowledge traditional management systems, improve community engagement, and build confidence in the water planning process. The researchers found that participatory planning approaches supported Tiwi natural resource management institutions both in determining appropriate institutional arrangements and clarifying roles and responsibilities in the Islands' Water Management Strategy.

  3. UOP HRM 300 Final Exam Guide (New, 2017) NEW

    OpenAIRE

    ADMIN

    2018-01-01

    UOP HRM 300 Final Exam Guide (New, 2017) NEW Check this A+ tutorial guideline at http://www.hrm300assignment.com/hrm-300-uop/hrm-300-final-exam-guide-latest For more classes visit http://www.hrm300assignment.com True and False: Please mark either T or F in the appropriate space before the question 1. ____A strategic plan is the company’s plan for how it will match its internal strengths and weaknesses with external opportunities and threats in or...

  4. The development and validation of the advance care planning questionnaire in Malaysia.

    Science.gov (United States)

    Lai, Pauline Siew Mei; Mohd Mudri, Salinah; Chinna, Karuthan; Othman, Sajaratulnisah

    2016-10-18

    Advance care planning is a voluntary process whereby individual preferences, values and beliefs are used to aid a person in planning for end-of-life care. Currently, there is no local instrument to assess an individual's awareness and attitude towards advance care planning. This study aimed to develop an Advance Care Planning Questionnaire and to determine its validity and reliability among older people in Malaysia. The Advance Care Planning Questionnaire was developed based on literature review. Face and content validity was verified by an expert panel, and piloted among 15 participants. Our study was conducted from October 2013 to February 2014, at an urban primary care clinic in Malaysia. Included were those aged >50 years, who could understand English. A retest was conducted 2 weeks after the first administration. Participants from the pilot study did not encounter any problems in answering the Advance Care Planning Questionnaire. Hence, no further modifications were made. Flesch reading ease was 71. The final version of the Advance Care Planning Questionnaire consists of 66 items: 30 items were measured on a nominal scale, whilst 36 items were measured on a Likert-like scale; of which we were only able to validate 22 items, as the remaining 14 items were descriptive in nature. A total of 245 eligible participants were approached; of which 230 agreed to participate (response rate = 93.9 %). Factor analysis on the 22 items measured on a Likert-scale revealed four domains: "feelings regarding advance care planning", "justifications for advance care planning", "justifications for not having advance care planning: fate and religion", and "justifications for not having advance care planning: avoid thinking about death". The Cronbach's alpha values for items each domain ranged from 0.637-0.915. In test-retest, kappa values ranged from 0.738-0.947. The final Advance Care Planning Questionnaire consisted of 63 items and 4 domains. It was found to be a valid and

  5. The 'final order' problem

    NARCIS (Netherlands)

    Teunter, RH; Haneveld, WKK

    1998-01-01

    When the service department of a company selling machines stops producing and supplying spare parts for certain machines, customers are offered an opportunity to place a so-called final order for these spare parts. We focus on one customer with one machine. The customer plans to use this machine up

  6. Multilayer Network Planning - A Practical Perspective

    OpenAIRE

    Autenrieth, Achim

    2018-01-01

    The paper presents a pragmatic and practical multilayer network planning approach based on a candidate lightpath auxiliary graph model. The paper discusses, how this approach can be applied to offline network planning as well as dynamic planning and provisioning of services.

  7. Scenario Based Network Infrastructure Planning

    DEFF Research Database (Denmark)

    Knudsen, Thomas Phillip; Pedersen, Jens Myrup; Madsen, Ole Brun

    2005-01-01

    The paper presents a method for IT infrastructure planning that take into account very long term developments in usages. The method creates a scenario for a final, time independent stage in the planning process. The method abstracts relevant modelling factors from available information...

  8. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  9. PUREX/UO3 deactivation project management plan

    International Nuclear Information System (INIS)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO 3 ) Plant, which converted the PUREX liquid uranium nitrate product to solid UO 3 powder. Final UO 3 Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO 3 Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO 3 Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings

  10. Institutional Formation of Family Planning in the District Sukabumi and the Bitung

    Directory of Open Access Journals (Sweden)

    Moh. Ilham A. Hamudy

    2015-03-01

    Full Text Available This study is about the implementation of family planning (KB in regional affairs. Nevertheless, this study focuses on the establishment of institutional care and family planning in the area set up. The purpose of this study is to get a complete picture of the role of family planning agencies that had stood alone in implementing family planning matters that have been handed over to the local government. By using the methods of descriptive and qualitative approach, this study found several things. First, there is impression of conflicts of interest (sectoral ego between Ministry of Home Affairs (MoHA and National Population and Family Planning Board (BKKBN on forming a population and family planning (BKKBD institutions in province, county and city. Second, the two regions, Sukabumi County and Bitung City that have shaped BKKBD has focused attention in supporting the success of family planning programs. Third, the integration of family planning into the regional medium-term development plan, as did the City of Bitung and Sukabumi County, ensure the sustainability of the program and budgeted in the regional budget revenue and expenditure (APBD. Finally, this study concludes, coordination and synchronization policies on family planning should be done by the BKKBN and MoHA.

  11. 78 FR 15797 - Service Delivery Plan

    Science.gov (United States)

    2013-03-12

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2012-0048] Service Delivery Plan AGENCY: Social... input as we finalize our Service Delivery Plan (SDP). We designed our SDP as a roadmap for how we will... Plan. DATES: To ensure that we consider your comments, we must receive them no later than April 11...

  12. Medicare and state health care programs: fraud and abuse, civil money penalties and intermediate sanctions for certain violations by health maintenance organizations and competitive medical plans--HHS. Final rule.

    Science.gov (United States)

    1994-07-15

    This final rule implements sections 9312(c)(2), 9312(f), and 9434(b) of Public Law 99-509, section 7 of Public Law 100-93, section 4014 of Public Law 100-203, sections 224 and 411(k)(12) of Public Law 100-360, and section 6411(d)(3) of Public Law 101-239. These provisions broaden the Secretary's authority to impose intermediate sanctions and civil money penalties on health maintenance organizations (HMOs), competitive medical plans, and other prepaid health plans contracting under Medicare or Medicaid that (1) substantially fail to provide an enrolled individual with required medically necessary items and services; (2) engage in certain marketing, enrollment, reporting, or claims payment abuses; or (3) in the case of Medicare risk-contracting plans, employ or contract with, either directly or indirectly, an individual or entity excluded from participation in Medicare. The provisions also condition Federal financial participation in certain State payments on the State's exclusion of certain prohibited entities from participation in HMO contracts and waiver programs. This final rule is intended to significantly enhance the protections for Medicare beneficiaries and Medicaid recipients enrolled in a HMO, competitive medical plan, or other contracting organization under titles XVIII and XIX of the Social Security Act.

  13. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    Science.gov (United States)

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  14. Keeping all options open: Parents' approaches to advance care planning.

    Science.gov (United States)

    Beecham, Emma; Oostendorp, Linda; Crocker, Joanna; Kelly, Paula; Dinsdale, Andrew; Hemsley, June; Russell, Jessica; Jones, Louise; Bluebond-Langner, Myra

    2017-08-01

    Early engagement in advance care planning (ACP) is seen as fundamental for ensuring the highest standard of care for children and young people with a life-limiting condition (LLC). However, most families have little knowledge or experience of ACP. To investigate how parents of children and young people with LLCs approach and experience ACP. Open-ended, semi-structured interviews were conducted with parents of 18 children; nine children who were currently receiving palliative care services, and nine children who had received palliative care and died. Verbatim transcripts of audiotaped interviews were analysed following principles of grounded theory while acknowledging the use of deductive strategies, taking account of both the child's condition, and the timing and nature of decisions made. Parents reported having discussions and making decisions about the place of care, place of death and the limitation of treatment. Most decisions were made relatively late in the illness and by parents who wished to keep their options open. Parents reported different levels of involvement in a range of decisions; many wished to be involved in decision making but did not always feel able to do so. This study highlights that parents' approaches to decision making vary by the type of decision required. Their views may change over time, and it is important to allow them to keep their options open. We recommend that clinicians have regular discussions over the course of the illness in an effort to understand parents' approaches to particular decisions rather than to drive to closure prematurely. © 2016 The Authors Health Expectations Published by John Wiley & Sons Ltd.

  15. Approaches to learning for the ANZCA Final Examination and validation of the revised Study Process Questionnaire in specialist medical training.

    Science.gov (United States)

    Weller, J M; Henning, M; Civil, N; Lavery, L; Boyd, M J; Jolly, B

    2013-09-01

    When evaluating assessments, the impact on learning is often overlooked. Approaches to learning can be deep, surface and strategic. To provide insights into exam quality, we investigated the learning approaches taken by trainees preparing for the Australian and New Zealand College of Anaesthetists (ANZCA) Final Exam. The revised two-factor Study Process Questionnaire (R-SPQ-2F) was modified and validated for this context and was administered to ANZCA advanced trainees. Additional questions were asked about perceived value for anaesthetic practice, study time and approaches to learning for each exam component. Overall, 236 of 690 trainees responded (34%). Responses indicated both deep and surface approaches to learning with a clear preponderance of deep approaches. The anaesthetic viva was valued most highly and the multiple choice question component the least. Despite this, respondents spent the most time studying for the multiple choice questions. The traditionally low short answer questions pass rate could not be explained by limited study time, perceived lack of value or study approaches. Written responses suggested that preparation for multiple choice questions was characterised by a surface approach, with rote memorisation of past questions. Minimal reference was made to the ANZCA syllabus as a guide for learning. These findings indicate that, although trainees found the exam generally relevant to practice and adopted predominantly deep learning approaches, there was considerable variation between the four components. These results provide data with which to review the existing ANZCA Final Exam and comparative data for future studies of the revisions to the ANZCA curriculum and exam process.

  16. On strategic spatial planning

    Directory of Open Access Journals (Sweden)

    Tošić Branka

    2014-01-01

    Full Text Available The goal of this paper is to explain the origin and development of strategic spatial planning, to show complex features and highlight the differences and/or advantages over traditional, physical spatial planning. Strategic spatial planning is seen as one of approaches in legally defined planning documents, and throughout the display of properties of sectoral national strategies, as well as issues of strategic planning at the local level in Serbia. The strategic approach is clearly recognized at the national and sub-national level of spatial planning in European countries and in our country. It has been confirmed by the goals outlined in documents of the European Union and Serbia that promote the grounds of territorial cohesion and strategic integrated planning, emphasizing cooperation and the principles of sustainable spatial development. [Projekat Ministarstva nauke Republike Srbije, br. 176017

  17. A strategic approach for Water Safety Plans implementation in Portugal.

    Science.gov (United States)

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  18. The diversity of waste disposal planning in Switzerland

    International Nuclear Information System (INIS)

    McCombie, C.

    1989-01-01

    In this overview of radioactive waste disposal planning in Switzerland, emphasis is placed upon describing the diversity of the planning and explaining the strategic thinking which has resulted in this diversity. Although Switzerland is a small country and has only a modest nuclear programme in absolute terms, planning and preparation for final disposal projects has been progressing for the last 10 or more years on a very broad front. The reasons for this breadth of approach are partly technical and partly determined by political and public pressures. Following a summary of the requirements for disposal and of the relevant boundary conditions, the resulting concepts are described and the controversial issue of repository siting is discussed. The current status of projects for disposal of low and intermediate-level wastes (L/ILW) and of high-level wastes (HLW) is noted; we conclude with some remarks on the advantages and disadvantages from the side of the organization responsible for implementation of repository projects of proceeding on such a broad technical front. (aughor). 2 figs.; 1 tab

  19. Resolution and optimization methods for tour planning problems

    International Nuclear Information System (INIS)

    Vasserot, Jean-Pierre

    1976-12-01

    The aim of this study is to describe computerized methods for the resolution of the computer supported tour planning problem. After a presentation of this problem in operational research, the different existing methods of resolution are reviewed with the different approaches which have led to their elaboration. Different critics and comparisons are made on these methods and some improvements and new procedures are proposed, some of them allowing to solve more general problems. Finally, the structure of such a program, made at the CII to solve this kind of problem under multiple constraints is analysed [fr

  20. Collaborative planning approach to inform the implementation of a healthcare manager intervention for hispanics with serious mental illness: a study protocol

    Directory of Open Access Journals (Sweden)

    Cabassa Leopoldo J

    2011-07-01

    Full Text Available Abstract Background This study describes a collaborative planning approach that blends principles of community-based participatory research (CBPR and intervention mapping to modify a healthcare manager intervention to a new patient population and provider group and to assess the feasibility and acceptability of this modified intervention to improve the physical health of Hispanics with serious mental illness (SMI and at risk for cardiovascular disease (CVD. Methods The proposed study uses a multiphase approach that applies CBPR principles and intervention-mapping steps--an intervention-planning approach--to move from intervention planning to pilot testing. In phase I, a community advisory board composed of researchers and stakeholders will be assembled to learn and review the intervention and make initial modifications. Phase II uses a combination of qualitative methods--patient focus groups and stakeholder interviews--to ensure that the modifications are acceptable to all stakeholders. Phase III uses results from phase II to further modify the intervention, develop an implementation plan, and train two care managers on the modified intervention. Phase IV consists of a 12-month open pilot study (N = 30 to assess the feasibility and acceptability of the modified intervention and explore its initial effects. Lastly, phase V consists of analysis of pilot study data and preparation for future funding to develop a more rigorous evaluation of the modified intervention. Discussion The proposed study is one of the few projects to date to focus on improving the physical health of Hispanics with SMI and at risk for CVD by using a collaborative planning approach to enhance the transportability and use of a promising healthcare manager intervention. This study illustrates how blending health-disparities research and implementation science can help reduce the disproportionate burden of medical illness in a vulnerable population.

  1. Collaborative planning approach to inform the implementation of a healthcare manager intervention for Hispanics with serious mental illness: a study protocol.

    Science.gov (United States)

    Cabassa, Leopoldo J; Druss, Benjamin; Wang, Yuanjia; Lewis-Fernández, Roberto

    2011-07-26

    This study describes a collaborative planning approach that blends principles of community-based participatory research (CBPR) and intervention mapping to modify a healthcare manager intervention to a new patient population and provider group and to assess the feasibility and acceptability of this modified intervention to improve the physical health of Hispanics with serious mental illness (SMI) and at risk for cardiovascular disease (CVD). The proposed study uses a multiphase approach that applies CBPR principles and intervention-mapping steps--an intervention-planning approach--to move from intervention planning to pilot testing. In phase I, a community advisory board composed of researchers and stakeholders will be assembled to learn and review the intervention and make initial modifications. Phase II uses a combination of qualitative methods--patient focus groups and stakeholder interviews--to ensure that the modifications are acceptable to all stakeholders. Phase III uses results from phase II to further modify the intervention, develop an implementation plan, and train two care managers on the modified intervention. Phase IV consists of a 12-month open pilot study (N = 30) to assess the feasibility and acceptability of the modified intervention and explore its initial effects. Lastly, phase V consists of analysis of pilot study data and preparation for future funding to develop a more rigorous evaluation of the modified intervention. The proposed study is one of the few projects to date to focus on improving the physical health of Hispanics with SMI and at risk for CVD by using a collaborative planning approach to enhance the transportability and use of a promising healthcare manager intervention. This study illustrates how blending health-disparities research and implementation science can help reduce the disproportionate burden of medical illness in a vulnerable population.

  2. Reducing the sensitivity of IMPT treatment plans to setup errors and range uncertainties via probabilistic treatment planning

    International Nuclear Information System (INIS)

    Unkelbach, Jan; Bortfeld, Thomas; Martin, Benjamin C.; Soukup, Martin

    2009-01-01

    Treatment plans optimized for intensity modulated proton therapy (IMPT) may be very sensitive to setup errors and range uncertainties. If these errors are not accounted for during treatment planning, the dose distribution realized in the patient may by strongly degraded compared to the planned dose distribution. The authors implemented the probabilistic approach to incorporate uncertainties directly into the optimization of an intensity modulated treatment plan. Following this approach, the dose distribution depends on a set of random variables which parameterize the uncertainty, as does the objective function used to optimize the treatment plan. The authors optimize the expected value of the objective function. They investigate IMPT treatment planning regarding range uncertainties and setup errors. They demonstrate that incorporating these uncertainties into the optimization yields qualitatively different treatment plans compared to conventional plans which do not account for uncertainty. The sensitivity of an IMPT plan depends on the dose contributions of individual beam directions. Roughly speaking, steep dose gradients in beam direction make treatment plans sensitive to range errors. Steep lateral dose gradients make plans sensitive to setup errors. More robust treatment plans are obtained by redistributing dose among different beam directions. This can be achieved by the probabilistic approach. In contrast, the safety margin approach as widely applied in photon therapy fails in IMPT and is neither suitable for handling range variations nor setup errors.

  3. submitter Biologically optimized helium ion plans: calculation approach and its in vitro validation

    CERN Document Server

    Mairani, A; Magro, G; Tessonnier, T; Kamp, F; Carlson, D J; Ciocca, M; Cerutti, F; Sala, P R; Ferrari, A; Böhlen, T T; Jäkel, O; Parodi, K; Debus, J; Abdollahi, A; Haberer, T

    2016-01-01

    Treatment planning studies on the biological effect of raster-scanned helium ion beams should be performed, together with their experimental verification, before their clinical application at the Heidelberg Ion Beam Therapy Center (HIT). For this purpose, we introduce a novel calculation approach based on integrating data-driven biological models in our Monte Carlo treatment planning (MCTP) tool. Dealing with a mixed radiation field, the biological effect of the primary $^4$He ion beams, of the secondary $^3$He and $^4$He (Z  =  2) fragments and of the produced protons, deuterons and tritons (Z  =  1) has to be taken into account. A spread-out Bragg peak (SOBP) in water, representative of a clinically-relevant scenario, has been biologically optimized with the MCTP and then delivered at HIT. Predictions of cell survival and RBE for a tumor cell line, characterized by ${{(\\alpha /\\beta )}_{\\text{ph}}}=5.4$ Gy, have been successfully compared against measured clonogenic survival data. The mean ...

  4. Utilize target motion to cover clinical target volume (ctv) - a novel and practical treatment planning approach to manage respiratory motion

    International Nuclear Information System (INIS)

    Jin Jianyue; Ajlouni, Munther; Kong Fengming; Ryu, Samuel; Chetty, Indrin J.; Movsas, Benjamin

    2008-01-01

    Purpose: To use probability density function (PDF) to model motion effects and incorporate this information into treatment planning for lung cancers. Material and methods: PDFs were calculated from the respiratory motion traces of 10 patients. Motion effects were evaluated by convolving static dose distributions with various PDFs. Based on a differential dose prescription with relatively lower dose to the clinical target volume (CTV) than to the gross tumor volume (GTV), two approaches were proposed to incorporate PDFs into treatment planning. The first approach uses the GTV-based internal target volume (ITV) as the planning target volume (PTV) to ensure full dose to the GTV, and utilizes the motion-induced dose gradient to cover the CTV. The second approach employs an inhomogeneous static dose distribution within a minimized PTV to best match the prescription dose gradient. Results: Motion effects on dose distributions were minimal in the anterior-posterior (AP) and lateral directions: a 10-mm motion only induced about 3% of dose reduction in the peripheral target region. The motion effect was remarkable in the cranial-caudal direction. It varied with the motion amplitude, but tended to be similar for various respiratory patterns. For the first approach, a 10-15 mm motion would adequately cover the CTV (presumed to be 60-70% of the GTV dose) without employing the CTV in planning. For motions 15-mm. An example of inhomogeneous static dose distribution in a reduced PTV was given, and it showed significant dose reduction in the normal tissue without compromising target coverage. Conclusions: Respiratory motion-induced dose gradient can be utilized to cover the CTV and minimize the lung dose without the need for more sophisticated technologies

  5. LDRD project final report : hybrid AI/cognitive tactical behavior framework for LVC.

    Energy Technology Data Exchange (ETDEWEB)

    Djordjevich, Donna D.; Xavier, Patrick Gordon; Brannon, Nathan Gregory; Hart, Brian E.; Hart, Derek H.; Little, Charles Quentin; Oppel, Fred John III; Linebarger, John Michael; Parker, Eric Paul

    2012-01-01

    This Lab-Directed Research and Development (LDRD) sought to develop technology that enhances scenario construction speed, entity behavior robustness, and scalability in Live-Virtual-Constructive (LVC) simulation. We investigated issues in both simulation architecture and behavior modeling. We developed path-planning technology that improves the ability to express intent in the planning task while still permitting an efficient search algorithm. An LVC simulation demonstrated how this enables 'one-click' layout of squad tactical paths, as well as dynamic re-planning for simulated squads and for real and simulated mobile robots. We identified human response latencies that can be exploited in parallel/distributed architectures. We did an experimental study to determine where parallelization would be productive in Umbra-based force-on-force (FOF) simulations. We developed and implemented a data-driven simulation composition approach that solves entity class hierarchy issues and supports assurance of simulation fairness. Finally, we proposed a flexible framework to enable integration of multiple behavior modeling components that model working memory phenomena with different degrees of sophistication.

  6. 75 FR 64197 - Additional Rules Regarding Hybrid Retirement Plans

    Science.gov (United States)

    2010-10-19

    ... regulations which include in the definition of an applicable defined benefit plan any defined benefit plan (or... benefits as the current value of an accumulated percentage of the participant's final average compensation... accumulated percentage of the participant's final average compensation and (2) the benefit attributable to...

  7. Planning Emergency Shelters for Urban Disaster Resilience: An Integrated Location-Allocation Modeling Approach

    Directory of Open Access Journals (Sweden)

    Laijun Zhao

    2017-11-01

    Full Text Available In recent years, extreme natural hazards threaten cities more than ever due to contemporary society’s high vulnerability in cities. Hence, local governments need to implement risk mitigation and disaster operation management to enhance disaster resilience in cities. Transforming existing open spaces within cities into emergency shelters is an effective method of providing essential life support and an agent of recovery in the wake of disasters. Emergency shelters planning must identify suitable locations for shelters and reasonably allocate evacuees to those shelters. In this paper, we first consider both the buildings’ post-disaster condition and the human choice factor that affect evacuees’ decision, and propose a forecasting method to estimate the time-varying shelter demand. Then we formulate an integrated location-allocation model that is used sequentially: an emergency shelter location model to satisfy the time-varying shelter demand in a given urban area with a goal of minimizing the total setup cost of locating the shelters and an allocation model that allocates the evacuees to shelters with a goal of minimizing their total evacuation distance. We also develop an efficient algorithm to solve the model. Finally, we propose an emergency shelters planning based on a case study of Shanghai, China.

  8. Test plan for ISV laboratory-pyrolysis testing

    Energy Technology Data Exchange (ETDEWEB)

    McAtee, R.E.

    1991-09-01

    The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

  9. TU-G-210-02: TRANS-FUSIMO - An Integrative Approach to Model-Based Treatment Planning of Liver FUS

    Energy Technology Data Exchange (ETDEWEB)

    Preusser, T. [Fraunhofer MEVIS & Jacobs University (Germany)

    2015-06-15

    Modeling can play a vital role in predicting, optimizing and analyzing the results of therapeutic ultrasound treatments. Simulating the propagating acoustic beam in various targeted regions of the body allows for the prediction of the resulting power deposition and temperature profiles. In this session we will apply various modeling approaches to breast, abdominal organ and brain treatments. Of particular interest is the effectiveness of procedures for correcting for phase aberrations caused by intervening irregular tissues, such as the skull in transcranial applications or inhomogeneous breast tissues. Also described are methods to compensate for motion in targeted abdominal organs such as the liver or kidney. Douglas Christensen – Modeling for Breast and Brain HIFU Treatment Planning Tobias Preusser – TRANS-FUSIMO – An Integrative Approach to Model-Based Treatment Planning of Liver FUS Tobias Preusser – TRANS-FUSIMO – An Integrative Approach to Model-Based Treatment Planning of Liver FUS Learning Objectives: Understand the role of acoustic beam modeling for predicting the effectiveness of therapeutic ultrasound treatments. Apply acoustic modeling to specific breast, liver, kidney and transcranial anatomies. Determine how to obtain appropriate acoustic modeling parameters from clinical images. Understand the separate role of absorption and scattering in energy delivery to tissues. See how organ motion can be compensated for in ultrasound therapies. Compare simulated data with clinical temperature measurements in transcranial applications. Supported by NIH R01 HL172787 and R01 EB013433 (DC); EU Seventh Framework Programme (FP7/2007-2013) under 270186 (FUSIMO) and 611889 (TRANS-FUSIMO)(TP); and P01 CA159992, GE, FUSF and InSightec (UV)

  10. TU-G-210-02: TRANS-FUSIMO - An Integrative Approach to Model-Based Treatment Planning of Liver FUS

    International Nuclear Information System (INIS)

    Preusser, T.

    2015-01-01

    Modeling can play a vital role in predicting, optimizing and analyzing the results of therapeutic ultrasound treatments. Simulating the propagating acoustic beam in various targeted regions of the body allows for the prediction of the resulting power deposition and temperature profiles. In this session we will apply various modeling approaches to breast, abdominal organ and brain treatments. Of particular interest is the effectiveness of procedures for correcting for phase aberrations caused by intervening irregular tissues, such as the skull in transcranial applications or inhomogeneous breast tissues. Also described are methods to compensate for motion in targeted abdominal organs such as the liver or kidney. Douglas Christensen – Modeling for Breast and Brain HIFU Treatment Planning Tobias Preusser – TRANS-FUSIMO – An Integrative Approach to Model-Based Treatment Planning of Liver FUS Tobias Preusser – TRANS-FUSIMO – An Integrative Approach to Model-Based Treatment Planning of Liver FUS Learning Objectives: Understand the role of acoustic beam modeling for predicting the effectiveness of therapeutic ultrasound treatments. Apply acoustic modeling to specific breast, liver, kidney and transcranial anatomies. Determine how to obtain appropriate acoustic modeling parameters from clinical images. Understand the separate role of absorption and scattering in energy delivery to tissues. See how organ motion can be compensated for in ultrasound therapies. Compare simulated data with clinical temperature measurements in transcranial applications. Supported by NIH R01 HL172787 and R01 EB013433 (DC); EU Seventh Framework Programme (FP7/2007-2013) under 270186 (FUSIMO) and 611889 (TRANS-FUSIMO)(TP); and P01 CA159992, GE, FUSF and InSightec (UV)

  11. Approaches to evaluating climate change impacts on species: A guide to initiating the adaptation planning process

    Science.gov (United States)

    Erika L. Rowland; Jennifer E. Davison; Lisa J. Graumlich

    2011-01-01

    Assessing the impact of climate change on species and associated management objectives is a critical initial step for engaging in the adaptation planning process. Multiple approaches are available. While all possess limitations to their application associated with the uncertainties inherent in the data and models that inform their results, conducting and incorporating...

  12. An Approach to Using Toxicogenomic Data in U.S. EPA Human Health Risk Assessments: A Dibutyl Phthalate Case Study (Final Report, 2010)

    Science.gov (United States)

    EPA announced the availability of the final report, An Approach to Using Toxicogenomic Data in U.S. EPA Human Health Risk Assessments: A Dibutyl Phthalate Case Study. This report outlines an approach to evaluate genomic data for use in risk assessment and a case study to ...

  13. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  14. Final integration and alignment of LINC-NIRVANA

    Science.gov (United States)

    Moreno-Ventas, Javier; Bizenberger, Peter; Bertram, Thomas; Radhakrishnan, Kalyan K.; Kittmann, Frank; Baumeister, Harald; Marafatto, Luca; Mohr, Lars; Herbst, Tom

    2016-08-01

    The LBT (Large Binocular Telescope), located at about 3200m on Mount Graham (Tucson, Arizona) is an innovative project undertaken by institutions from Europe and USA. LINC-NIRVANA is an instrument which provides MCAO (Multi-Conjugate Adaptive Optics) and interferometry, combining the light from the two 8.4m telescopes coherently. This configuration offers 23m-baseline optical resolution and the sensitivity of a 12m mirror, with a 2 arc-minute diffraction limited field of view. The integration, alignment and testing of such a big instrument requires a well-organized choreography and AIV planning which has been developed in a hierarchical way. The instrument is divided in largely independent systems, and all of them consist of various subsystems. Every subsystem integration ends with a verification test and an acceptance procedure. When a certain number of systems are finished and accepted, the instrument AIV phase starts. This hierarchical approach allows testing at early stages with simple setups. The philosophy is to have internally aligned subsystems to be integrated in the instrument optical path, and extrapolate to finally align the instrument to the Gregorian bent foci of the telescope. The alignment plan was successfully executed in Heidelberg at MPIA facilities, and now the instrument is being re-integrated at the LBT over a series of 11 campaigns along the year 2016. After its commissioning, the instrument will offer MCAO sensing with the LBT telescope. The interferometric mode will be implemented in a future update of the instrument. This paper focuses on the alignment done in the clean room at the LBT facilities for the collimator, camera, and High-layer Wavefront Sensor (HWS) during March and April 2016. It also summarizes the previous work done in preparation for shipping and arrival of the instrument to the telescope. Results are presented for every step, and a final section outlines the future work to be done in next runs until its final commissioning.

  15. Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

    Science.gov (United States)

    Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth

    2018-01-01

    The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544

  16. Integrated resource planning in the power sector and economy-wide changes in environmental emissions

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Marpaung, Charles O.P.

    2006-01-01

    This paper analyzes the roles of key factors (i.e., changes in structure, fuel mix and final demand) on total economy-wide changes in CO 2 , SO 2 and NO x emissions when power sector development follows the integrated resource planning (IRP) approach instead of traditional supply-based electricity planning (TEP). It also considers the rebound effect (RE) of energy efficiency improvements in the demand side and analyzes the sensitivity of the results to variations in the values of the RE. A framework is developed to decompose the total economy-wide change in the emission of a pollutant into four major components, i.e., structural change-, fuel mix- , final demand- and joint-effects. The final demand effect is further decomposed into three categories, i.e., construction of power plants, electricity final demand and final demand related to electricity using equipments. The factor decomposition framework is then applied in the case of the power sector in Indonesia. A key finding in the case of Indonesia is that in the absence of the RE, there would be total economy-wide reductions in CO 2 , SO 2 and NO x emissions of 431, 1.6 and 1.3 million tons respectively during the planning horizon of 2006-2025 under IRP as compared to that under TEP. The decomposition analysis shows that the final demand effect would account for 38% of the total CO 2 emission reduction followed by the structural change effect (35.1%) and fuel mix effect (27.6%) while the joint effect is negligible. The study also shows that economy-wide CO 2 emission reduction due to IRP considering the RE of 45% would be 241 million tons as compared to 333 million tons when the RE is 25%

  17. Integrated resource planning in the power sector and economy-wide changes in environmental emissions

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Marpaung, Charles O.P.

    2006-01-01

    This paper analyzes the roles of key factors (i.e., changes in structure, fuel mix and final demand) on total economy-wide changes in CO 2 , SO 2 and NO x emissions when power sector development follows the integrated resource planning (IRP) approach instead of traditional supply-based electricity planning (TEP). It also considers the rebound effect (RE) of energy efficiency improvements in the demand side and analyzes the sensitivity of the results to variations in the values of the RE. A framework is developed to decompose the total economy-wide change in the emission of a pollutant into four major components, i.e., structural change-, fuel mix- , final demand- and joint-effects. The final demand effect is further decomposed into three categories, i.e., construction of power plants, electricity final demand and final demand related to electricity using equipment. The factor decomposition framework is then applied in the case of the power sector in Indonesia. A key finding in the case of Indonesia is that in the absence of the RE, there would be total economy-wide reductions in CO 2 , SO 2 and NO x emissions of 431, 1.6 and 1.3 million tons respectively during the planning horizon of 2006-2025 under IRP as compared to that under TEP. The decomposition analysis shows that the final demand effect would account for 38% of the total CO 2 emission reduction followed by the structural change effect (35.1%) and fuel mix effect (27.6%) while the joint effect is negligible. The study also shows that economy-wide CO 2 emission reduction due to IRP considering the RE of 45% would be 241 million tons as compared to 333 million tons when the RE is 25%. (Author)

  18. Smart Dialogue for Smart Citizens: Assertive Approaches for Strategic Planning

    Directory of Open Access Journals (Sweden)

    Isidoro Fasolino

    2014-05-01

    Full Text Available It is very important to know how to communicate, but even more important is knowing how to listen. There is no dialogue without listening. Listening and speaking can generate a virtuous cycle that, enriching the field of information, allows the introduction of essential elements of innovation. It is relevant in this context the assertive ability of who manages and coordinates the decision-making processes. The potential of new approaches based on assertiveness are the new frontier of research discipline that is able to meet future challenges aiming to contribute to the construction of places and forms of living together in the growing interest of fairness and justice. Assertive facilitator knows how to guide difficult people and handle very hard situations without adopting manipulative behaviors. He is able to detect the potential conflict and to bring to light the reasons for disagreement , softening the tone and avoiding any possible uncontrolled escalation. He encourages debates and open discussions; he has to build links too, fueling reports profits, collaborating with others toward common goals; speaking and discussing in groups and among groups; seeking solutions in which, both parties, come out winning. So the view expressed is argument of discussion in the development of the tools of urban structure, with the aim of implementing a participatory methodology in the development of planning tools. We propose an application in the series of meetings of initial preparatory participation to the formation of a Preliminary Plan for a medium size town.

  19. Planning for seven generations: Energy planning of American Indian tribes

    International Nuclear Information System (INIS)

    Brookshire, Daniel; Kaza, Nikhil

    2013-01-01

    The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development

  20. Site Study Plan for salt, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Salt Site Study Plan (SSP) describes a program for characterizing the existing salt environment in the site vicinity. A step-by-step approach is described which proceeds from published data and planned theoretical studies, to planned laboratory studies, and finally to planned field studies, to provide the necessary data to meet program requirements contained in the Salt Repository Project - Requirements Document (SRP-RD). The plan also draws on the results of other SSP's for certain data; for example, soil salinity data are to be provided under the Soils SSP. The salt studies consist of evaluation of control and mitigation measures, salt monitoring studies, emission factors development, air models development and validation, and risk assessment. For each study, its design and design rationale; analysis, management, and use of data; schedule of activities; organization of personnel and sample management; and quality assurance requirements are described. 90 refs., 9 figs., 7 tabs

  1. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  2. Intervention planning for a digital intervention for self-management of hypertension: a theory-, evidence- and person-based approach.

    Science.gov (United States)

    Band, Rebecca; Bradbury, Katherine; Morton, Katherine; May, Carl; Michie, Susan; Mair, Frances S; Murray, Elizabeth; McManus, Richard J; Little, Paul; Yardley, Lucy

    2017-02-23

    This paper describes the intervention planning process for the Home and Online Management and Evaluation of Blood Pressure (HOME BP), a digital intervention to promote hypertension self-management. It illustrates how a Person-Based Approach can be integrated with theory- and evidence-based approaches. The Person-Based Approach to intervention development emphasises the use of qualitative research to ensure that the intervention is acceptable, persuasive, engaging and easy to implement. Our intervention planning process comprised two parallel, integrated work streams, which combined theory-, evidence- and person-based elements. The first work stream involved collating evidence from a mixed methods feasibility study, a systematic review and a synthesis of qualitative research. This evidence was analysed to identify likely barriers and facilitators to uptake and implementation as well as design features that should be incorporated in the HOME BP intervention. The second work stream used three complementary approaches to theoretical modelling: developing brief guiding principles for intervention design, causal modelling to map behaviour change techniques in the intervention onto the Behaviour Change Wheel and Normalisation Process Theory frameworks, and developing a logic model. The different elements of our integrated approach to intervention planning yielded important, complementary insights into how to design the intervention to maximise acceptability and ease of implementation by both patients and health professionals. From the primary and secondary evidence, we identified key barriers to overcome (such as patient and health professional concerns about side effects of escalating medication) and effective intervention ingredients (such as providing in-person support for making healthy behaviour changes). Our guiding principles highlighted unique design features that could address these issues (such as online reassurance and procedures for managing concerns). Causal

  3. Recognition of management structure and spatial planning in Tehran metropolitan area

    Directory of Open Access Journals (Sweden)

    Manijeh Lalehpour

    2016-06-01

    Full Text Available Metropolitan areas are concentrated and dense areas filled settlements and include a central urban region with its surrounding residences. Severity and complexity of issues in metropolitan areas along with intricacy and quantity of influential factors in these areas necessitate novel approaches and innovative solutions for comprehensive strategies and management coordination of land use in these regions. The present study has taken this approach to investigate management structure and spatial planning in Tehran metropolitan area. The study takes parameters like political and management decentralization, elements affecting urban management based on the sources of power and province and finally spatial domain of urban management into account. Findings revealed that decentralization in national management and political structure has limited tasks and authority of urban management. In this regard, a closer look at management structure and spatial planning of Tehran metropolitan are demonstrates that the government and its element dominate policy making, planning and spatial management of the city and inherent position of municipality and city council suffer weaknesses in their role as urban management. Results from investigating official tasks in urban management elements and their spatial domain reveals lack of coordination and Fragmentation in management structure and spatial planning in the region. The paper attempts to discuss these Fragmentation in the fields of management, function, politics and domains.

  4. Technology decision making. A constructive approach to planning and acquisition will require a paradigm shift.

    Science.gov (United States)

    Berkowitz, D A; Swan, M M

    1993-01-01

    Technology should be viewed as an integrating rather than a divisive element in hospital planning. In the past, technology decision-making responsibility has often been diffused throughout hospitals, but providers are beginning to take a more considered and coherent approach. The process of making decisions about technology has four key elements: assessment, planning, acquisition, and management. The most important aspect of the assessment phase is the formation of a technology advisory committee to review and evaluate requests for new and emerging technology; review capital budget requests for new and replacement technology; and set mission-based and strategic priorities for new, emerging, and replacement technologies. Technology planning allows hospitals to set long-term goals for technology acquisition. The process involves an audit of existing technologies, evaluation of other hospitals' technologies, and review of technology trends. A well-defined technology plan will, in turn, facilitate the acquisition and management process, allowing hospitals greater flexibility in negotiating costs and budgeting for training, spare parts, service, upgrades, and support. By pooling resources with other providers in their region, hospitals can further enhance the effectiveness of their use and acquisition of technology. Collaboration allows providers to share the risks of technologically volatile and intensive services and avoid costly duplication of equipment and facilities.

  5. Problem in application carrying capacity approach for land allocation assessment in Indonesian municipal spatial planning: A case of Kutai Kartanegara Regency

    Science.gov (United States)

    Wijaya, I. N. S.; Rahadi, B.; Lusiana, N.; Maulidina, I.

    2017-06-01

    Urbanization in many countries, such as Indonesia, is commonly appeared as a dynamic population of developed areas. It is followed with reducing rural uses of land for improving urban land uses such as housing, industry, infrastructure, etc. in response to the growth of population. One may not be sufficiently considered by the urban planners and the decision makers, urbanization also means escalation of natural resources consumption that should be supported by the natural capacity of the area. In this situation, balancing approach as carrying capacity calculation in spatial planning is needed for sustainability. Indonesian Spatial Planning Law 26/2007 has already expressed about the balance approach in the system. Moreover, it strictly regulates the assessment and the permission system in controlling land development, especially for the conversion. However, the reductions over the rural uses of land, especially agriculture, are continuously occurred. Concerning the planning approach, this paper aims to disclose common insufficiency of carrying capacity considerations in Indonesian spatial planning practice. This paper describes common calculation weaknesses in projecting area for the urban development by recalculating the actual gap between supply and demand of agriculture land areas. Here, municipal spatial plan of Kutai Kartanegara Regency is utilized as single sample case to discuss. As the result, the recalculation shows that: 1) there are serious deficit status of agriculture land areas in order to fulfil the demanded agriculture production for the existed population, 2) some calculation of agriculture production may be miss-interpreted because of insufficient explanation toward the productivity of each agriculture commodity.

  6. Decentralized energy planning and consensus in energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T. J.

    1980-05-02

    This paper explores the following three propositions and their relationships: (1) that, in our pluralistic policymaking environment, we cannot solve our nation's energy problems unless we can reach agreement among a diverse group of interested parties about specific actions; (2) that, short of a manifest emergency, such a consensus is difficult to reach unless the scale of the decision-making unit is relatively small; and therefore (3) that one of the keys to an effective energy policy in the United states is to rely heavily on local and regional energy planning and decision-making. First, the paper reviews our problem of irresolution and its roots, and it summaries the policy options for resolving it. Then it explores one of those options, decentralized planning, in a little more detail. Finally, it offers some speculations about the viability of a decentralized approach to energy planninng.

  7. A Strategic Spatial Planning Approach to Cross-Border Place Branding with References to Galicia and Northern Portugal

    NARCIS (Netherlands)

    da Silva Oliveira, Eduardo; Zenker, Sebastian; Jacobsen, Björn

    2015-01-01

    This chapter adopts a strategic spatial planning approach to think strategically about potential joint place-branding initiatives between cross-border regions. The case study focuses on the extended cross-border European region composed of the NUTS III Alto Minho, Cávado, Ave, Área Metropolitina do

  8. Solar envelope zoning: application to the city planning process. Los Angeles case study

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    Solar envelope zoning represents a promising approach to solar access protection. A solar envelope defines the volume within which a building will not shade adjacent lots or buildings. Other solar access protection techniques, such as privately negotiated easements, continue to be tested and implemented but none offer the degree of comprehensiveness evident in this approach. Here, the City of Los Angeles, through the Mayor's Energy Office, the City Planning Department, and the City Attorney's Office, examine the feasibility of translating the concept of solar envelopes into zoning techniques. They concluded that envelope zoning is a fair and consistent method of guaranteeing solar access, but problems of complexity and uncertainty may limit its usefulness. Envelope zoning may be inappropriate for the development of high density centers and for more restrictive community plans. Aids or tools to administer envelope zoning need to be developed. Finally, some combination of approaches, including publicly recorded easements, subdivision approval and envelope zoning, need to be adopted to encourage solar use in cities. (MHR)

  9. 242-A Campaign 99-1 process control plan; FINAL

    International Nuclear Information System (INIS)

    LE, E.Q.

    1999-01-01

    242-A Evaporator 99-1 will process approximately one million gallons of waste from tank 102-AW in June 1999. The process control Plan provides a general description of activities, which will occur during 242-A Evaporator Campaign 99-1 and to document analyses conducted to demonstrate that 102-AW waste is acceptable for processing. Predict is a registered trademark of Risk Decisions England Corporation, United Kingdom

  10. Medicaid and Children's Health Insurance Programs: essential health benefits in alternative benefit plans, eligibility notices, fair hearing and appeal processes, and premiums and cost sharing; exchanges: eligibility and enrollment. Final rule.

    Science.gov (United States)

    2013-07-15

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act. This final rule finalizes new Medicaid eligibility provisions; finalizes changes related to electronic Medicaid and the Children's Health Insurance Program (CHIP) eligibility notices and delegation of appeals; modernizes and streamlines existing Medicaid eligibility rules; revises CHIP rules relating to the substitution of coverage to improve the coordination of CHIP coverage with other coverage; and amends requirements for benchmark and benchmark-equivalent benefit packages consistent with sections 1937 of the Social Security Act (which we refer to as ``alternative benefit plans'') to ensure that these benefit packages include essential health benefits and meet certain other minimum standards. This rule also implements specific provisions including those related to authorized representatives, notices, and verification of eligibility for qualifying coverage in an eligible employer-sponsored plan for Affordable Insurance Exchanges. This rule also updates and simplifies the complex Medicaid premium and cost sharing requirements, to promote the most effective use of services, and to assist states in identifying cost sharing flexibilities. It includes transition policies for 2014 as applicable.

  11. DASH Eating Plan

    Science.gov (United States)

    ... Approaches to Stop Hypertension. It is an eating plan that is based on research studies sponsored by ... risk of getting heart disease. The DASH eating plan Emphasizes vegetables, fruits, and whole-grains Includes fat- ...

  12. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    Science.gov (United States)

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  13. Learning Approaches - Final Report Sub-Project 4

    DEFF Research Database (Denmark)

    Dirckinck-Holmfeld, Lone; Rodríguez Illera, José Luis; Escofet, Anna

    2007-01-01

    The overall aim of Subproject 4 is to apply learning approaches that are appropriate and applicable using ICT. The task is made up of two components 4.1 dealing with learning approaches (see deliverable 4.1), and component 4.2 application of ICT (see deliverable 4.2, deliverable 4.3 & deliverable...

  14. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  15. Emergency plan belgian experience

    International Nuclear Information System (INIS)

    Clymans, A.

    1989-01-01

    The Chernobyl disaster prompted authorities in Belgium to carry out a comprehensive review of all emergency plans and, in particular, those designed specifically for nuclear accidents. This review was aimed at determining what type of plans existed and to what extent such plans were operational. This paper sets out to present a broad overview of different aspects of this problem: organization of public emergency plans, co-ordination of operations, merits and demerits of centralization as opposed to decentralization, planning zones, obligation to release information to the public and relations with the media, and finally the international dimension to the problem. The author expresses the hope that the latter area will inspire practical suggestions [fr

  16. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    International Nuclear Information System (INIS)

    Chang, J.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  17. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    Energy Technology Data Exchange (ETDEWEB)

    Chang, J. [New York Weill Cornell Medical Ctr (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  18. On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process

    Science.gov (United States)

    Hongzhi, Zhao; Jian, Zhang

    2018-03-01

    The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.

  19. Plan4all – A European Approach to Spatial Data Used on Territorial Planning

    Directory of Open Access Journals (Sweden)

    GERGELY TÖRÖK

    2011-01-01

    Full Text Available In order to ensure the increased efficiency of European policies and the implementation of Structural Funds in a more balanced manner in the different territories of the country, a number of eight development regions have been established in Romania, corresponding to NUTS II level. In between these regions, as well as within each of them, a major concern is the diminution of economic and social disparities. Moreover, these disparities can manifest themselves in a cross-border context, jumping the administrative boundaries of regions and even neighbouring countries. In this sense, development plans provide certain measures in order to stimulate a more balanced development of the territories, using spatial planning as the actual support in identifying factors that lead to the emergence and intensifying of regional disparities. The present paper focuses on these aspects related to spatial planning data in the context of the recent European initiatives, through the activities of the Plan4all project that is being implemented by a European consortium. Romania is partner in this project and is represented by the North-West Regional Development Agency (North-West RDA. The paper presents the achievements of the running Plan4all project until the present day, as well as the involvement and the contributions of the North-West RDA so far.

  20. Teaching planning theory as planner roles in urban planning education

    DEFF Research Database (Denmark)

    Olesen, Kristian

    2018-01-01

    Planning theory is often portrayed as a subject that urban planning students find too abstract and fail to see the relevance of. This paper advocates the perspective that planning theory can be made more student-friendly. This requires, firstly, that academic discussions about the relevance...... of planning theory for urban planning practice are integrated into the course module. If students are to appreciate planning theory, it requires that they understand how planning theory can inspire planning practice. Secondly, it requires careful considerations to the pedagogy of planning theory. The paper...... suggests that teaching planning theory as a variety of planner roles offers a helpful pedagogical approach for helping students construct their identities as urban planners. The paper builds on the author’s own experiences of teaching planning theory in a master’s urban planning programme, and has been...

  1. Resampling: An optimization method for inverse planning in robotic radiosurgery

    International Nuclear Information System (INIS)

    Schweikard, Achim; Schlaefer, Alexander; Adler, John R. Jr.

    2006-01-01

    By design, the range of beam directions in conventional radiosurgery are constrained to an isocentric array. However, the recent introduction of robotic radiosurgery dramatically increases the flexibility of targeting, and as a consequence, beams need be neither coplanar nor isocentric. Such a nonisocentric design permits a large number of distinct beam directions to be used in one single treatment. These major technical differences provide an opportunity to improve upon the well-established principles for treatment planning used with GammaKnife or LINAC radiosurgery. With this objective in mind, our group has developed over the past decade an inverse planning tool for robotic radiosurgery. This system first computes a set of beam directions, and then during an optimization step, weights each individual beam. Optimization begins with a feasibility query, the answer to which is derived through linear programming. This approach offers the advantage of completeness and avoids local optima. Final beam selection is based on heuristics. In this report we present and evaluate a new strategy for utilizing the advantages of linear programming to improve beam selection. Starting from an initial solution, a heuristically determined set of beams is added to the optimization problem, while beams with zero weight are removed. This process is repeated to sample a set of beams much larger compared with typical optimization. Experimental results indicate that the planning approach efficiently finds acceptable plans and that resampling can further improve its efficiency

  2. Planning and the Public Interest. A Critical Review

    Directory of Open Access Journals (Sweden)

    JÚLIA A. NAGY

    2015-12-01

    Full Text Available From an ethical perspective, the biggest difficulty for planners is to take the best approach in responding to the decision makers and in acting in the public interest because it always becomes subject of pressures arising with the governmental change, on the one hand, and the societal change on the other hand. Even though many debates arise regarding its existence, for planners, as well as for the planning profession, the public interest has always been legitimizing principles as a norm of practice (Alexander, 2002. The paper critically analyses the planning activity in relation to the public interest and highlights the importance of reciprocity between the two. In order to analyse this issue, the article starts with the presentation of different perspectives regarding the public interest, touching upon its conceptual meaning which is followed by a historical review of its origins and transformation. The third section presents its contextual meaning, its representatives, and the change of its content starting from the 19th century until nowadays and discusses the planners’ ability to represent it. The final part comprises the conclusions that indicate that the planning activity should serve the public interest and, by that, it would serve also the interest of planning as a profession. It emphasises two important issues of the present days: the definition of the public interest and the rational decision making within the planning process.

  3. New Approaches for the Use of the Classical Tools of Scenario Planning

    Directory of Open Access Journals (Sweden)

    Ricardo Balieiro Fischer

    2016-04-01

    Full Text Available The future is to be built – is multiple and uncertain. Within the social sciences, scenarios can be defined as a description of a future situation and a course of events that allow move from a primary position toward this future situation. Currently, there is a multiplicity of methods and tools available for building scenarios, including methods of an essentially rationalist approach, as Michel Godet’s method. The purpose of this work is to use the hypothetical-deductive method to reduce, starting from Michel Godet’s Scenario Method and its tools, the complexity of the scenario-building process while maintaining the robustness of the findings. For this purpose, it is proposed two different approaches: (1 to integrate, in one step, the structural analysis and the cross-impact matrix so the first one derives automatically while filling the last one; (2 to use the concept of Bayesian networks as a method to integrate the cross-impact matrix and the morphological analysis. Both approaches aim to reduce the amount of information needed to feed the tools and improve the feedback criteria, resulting in greater flexibility during the process and better holistic view of the system. Scientifically, these approaches open a new field of studies in scenario planning as it appropriates the concept of Bayesian networks, widely used in other areas of knowledge (artificial intelligence, geological studies, medical diagnostics, pattern classification, etc., and bring it to the field of social sciences.

  4. Scenario Approach to the Planning of the Production Activities of the Enterprise with a Discrete Type of Production (for Example, Electrical Engineering Industry

    Directory of Open Access Journals (Sweden)

    Krylova E.V.

    2017-12-01

    Full Text Available In conditions of global economic instability the success of electromechanical enterprises depends on their ability to react quickly to challenges of external environment. In order to create background and conditions for this ability the given enterprises refer to manufacturing activity planning, using a probabilistic approach based on forecasts that may not be true. The question of provision of more complete consideration of various internal and external factors and acceleration of decision making process and reaction to changing business environment arises before the organizations that concern more effective scheduling policy. International practice of solving such problems generally leads to qualitative discussion, whereas quantitative assessment of impact of control parameters of enterprise is not practically used, because there is no one systematic approach to manufacturing activity planning. On the basis of studying of international practices methodical guidelines of scenario approach to manufacturing activity planning with mathematical modeling of economics of producer price on electromechanical enterprises have been developed, which reasonably could be used with reference to and interaction with enterprise manufacturing program. The described approach allows solving planning problems iteratively in real-time mode concerning profit maximization, to form producer prices, to divide overhead costs according to the type of products and carry out cost accounting according to the type of a product, and it will provide functional interaction between factors and performance indicators.

  5. Final Report: Evaluation of Tools and Metrics to Support Employer Selection of Health Plans.

    Science.gov (United States)

    Mattke, Soeren; Van Busum, Kristin R; Martsolf, Grant R

    2014-01-01

    The Patient Protection and Affordable Care Act (ACA) places strong emphasis on quality of care as a means to improve outcomes for Americans and promote the financial sustainability of our health care system. Included in the ACA are new disclosure requirements that require health plans to provide a summary of benefits and coverage that accurately describes the benefits under the plan or coverage. These requirements are intended to support employers' procurement of high-value health coverage for their employees. This study attempts to help employers understand the structural differences between health plans and the performance dimensions along which plans can differ, as well as to educate employers about available tools that can be used to evaluate plan options. The study also discusses the extent to which these and other tools or resources are used by employers to inform choices between health plans.

  6. Planning in the Continuous Operations Environment of the International Space Station

    Science.gov (United States)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  7. Waste feed delivery test and evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    O' TOOLE, S.M.

    1999-09-30

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach.

  8. Waste feed delivery test and evaluation plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach

  9. Defense waste management plan

    International Nuclear Information System (INIS)

    1983-06-01

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  10. New source terms and the implications for emergency planning requirements at nuclear power plants in the United State

    International Nuclear Information System (INIS)

    Kaiser, G.D.; Cheok, M.C.

    1987-01-01

    This paper begins with a brief review of current approaches to source term driven changes to NRC emergency planning requirements and addresses significant differences between them. Approaches by IDCOR and EPRI, industry submittals to NRC and alternative risk-based evaluations have been considered. Important issues are discussed, such as the role of Protective Action Guides in determining the radius of the emergency planning zone (EPZ). The significance of current trends towards the prediction of longer warning times and longer durations of release in new source terms is assessed. These trends may help to relax the current notification time requirements. Finally, the implications of apparent support in the regulations for a threshold in warning time beyond which ad hoc protective measures are adequate is discussed

  11. Groundwater regulation and integrated planning

    Science.gov (United States)

    Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.

    2016-01-01

    The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.

  12. THE PLANNING OF A CUSTOMER RELATIONSHIP MANAGEMENT PROJECT: REQUIREMENTS AND OPPORTUNITIES

    Directory of Open Access Journals (Sweden)

    Adriana OLARU

    2007-01-01

    Full Text Available After a brief presentation of the aspects regarding the planning of a customer relationship management (CRM project, we emphasize the factors that assure the success of such an approach. In order to obtain the attended results, an organization needs the best selection of the project manager and the most efficient teamwork, which implies employees from the company’s departments and also IT specialists. In the final part, we made appreciations concerning the efficiency of a CRM project and the opportunities created by its implementation.

  13. EVENT PLANNING USING FUNCTION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase; Jodi Grgich

    2011-06-01

    Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

  14. Approach to operational mine planning: Case study Tamnava West

    Directory of Open Access Journals (Sweden)

    Stevanović Dejan R.

    2014-01-01

    Full Text Available In contemporary mining industry is very difficult to achieve production targets and profit without investing effort in detailed excavation planning. It is especially true for deposits with complex geological structure and production technology, as is the case for many coal mines in Serbia. The majority of coal production is used for generation of electricity in power plant. This fact is the main reason why production objectives of coal mine and power plant are strongly connected. Due to the fluctuation of the coal quality, operational mine planning (as a part of coal homogenization process, is of critical importance for managing successful coal quality control and meeting criteria of power plant. This paper investigates advantage of proper operational planning on coal quality control process and overall production performance. For better understanding case study is conducted on open pit Tamnava West field. Successful operational mine planning is almost impossible without use of modern software packages. For that reason in presented case study operational mine planning is done with Minex software.

  15. Two approaches for incorporating climate change into natural resource management planning at Wind Cave National Park

    Science.gov (United States)

    Symstad, Amy J.; Long, Andrew J.; Stamm, John; King, David A.; Bachelet, Dominque M.; Norton, Parker A.

    2014-01-01

    Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches. Wind Cave National Park (WICA) protects one of the world’s longest caves

  16. Planning the diffusion of a neck-injury prevention programme among community rugby union coaches.

    Science.gov (United States)

    Donaldson, Alex; Poulos, Roslyn G

    2014-01-01

    This paper describes the development of a theory-informed and evidence-informed, context-specific diffusion plan for the Mayday Safety Procedure (MSP) among community rugby coaches in regional New South Wales, Australia. Step 5 of Intervention Mapping was used to plan strategies to enhance MSP adoption and implementation. Coaches were identified as the primary MSP adopters and implementers within a system including administrators, players and referees. A local advisory group was established to ensure context relevance. Performance objectives (eg, attend MSP training for coaches) and determinants of adoption and implementation behaviour (eg, knowledge, beliefs, skills and environment) were identified, informed by Social Cognitive Theory. Adoption and implementation matrices were developed and change-objectives for coaches were identified (eg, skills to deliver MSP training to players). Finally, intervention methods and specific strategies (eg, coach education, social marketing and policy and by-law development) were identified based on advisory group member experience, evidence of effective coach safety behaviour-change interventions and Diffusion of Innovations theory. This is the first published example of a systematic approach to plan injury prevention programme diffusion in community sports. The key strengths of this approach were an effective researcher-practitioner partnership; actively engaging local sports administrators; targeting specific behaviour determinants, informed by theory and evidence; and taking context-related practical strengths and constraints into consideration. The major challenges were the time involved in using a systematic diffusion planning approach for the first time; and finding a planning language that was acceptable and meaningful to researchers and practitioners.

  17. Planning Innovation and Regional Development: the Spreading of Urban Strategic Planning in Southern Italy

    OpenAIRE

    Vinci, Ignazio

    2011-01-01

    For decades the Italian system of planning has been strongly characterized by a regulatory approach and the question of cities' development had been taken into account within general land use plans. In the 1990s this approach has been considered a strong constraint on the regeneration of cities and the revitalization of their economic potential. Therefore, in the last decade the improvement of flexibility and participation within planning processes were considered primary objectives both at r...

  18. Treatment Planning for Ion Beam Therapy

    Science.gov (United States)

    Jäkel, Oliver

    The special aspects of treatment planning for ion beams are outlined in this chapter, starting with positioning and immobilization of the patient, describing imaging and segmentation, definition of treatment parameters, dose calculation and optimization, and, finally, plan assessment, verification, and quality assurance.

  19. Population planning: a well co-ordinated approach required.

    Science.gov (United States)

    1984-01-01

    of the region explicit or implicit incentives and/or disincentives are included in the population/family planning program. In the Philippine Population Program, incentives are explicitly given only to volunteer program workers. Disincentives are incorporated in the Internal Revenue Code and the Woman and Child Labor Code. In Indonesia preference is given to incentives rather than to disincentives. The government of Bangladesh is seriously considering the introduction of a package deal of incentives and disincentives in an all out effort to reach desired demographic objectives. In Nepal such a package is already in operation. The more recent innovative measures to encourage the 2-child child family norm in India include: increased compensation money to acceptors of sterilization and IUD and giving lottery tickets to acceptors of sterilization. There is recognition in these countries of the need for an integrated approach to population and development programs.

  20. Transmission planning in a deregulated environment

    DEFF Research Database (Denmark)

    Xu, Zhao

    2006-01-01

    The worldwide trend for the deregulation of the electricity generation and transmission industries has led to dramatic changes in system operation and planning procedures. The optimum approach to transmission-expansion planning in a deregulated environment is an open problem especially when the r...... electricity market grid are performed. In addition, the proposed method is compared with a traditional planning method to further verify its effectiveness....... the responsibilities of the organisations carrying out the planning work need to be addressed. To date there is a consensus that the system operator and network manager perform the expansion planning work in a centralised way. However, with an increasing input from the electricity market, the objectives, constraints...... and approaches toward transmission planning should be carefully designed to ensure system reliability as well as meeting the market requirements. A market-oriented approach for transmission planning in a deregulated environment is proposed. Case studies using the IEEE 14-bus system and the Australian national...