WorldWideScience

Sample records for plan wd-s97556 issue

  1. Planning issues for IMRT

    International Nuclear Information System (INIS)

    Hoban, P.; Schneider, M.; Smee, R.

    2001-01-01

    Full text: Despite the 'inverse planning' stage of an intensity modulated radiotherapy (IMRT) treatment there remains a large number of variables that can, and must, be set manually. These variables can significantly affect the quality of the dose distribution arrived at by the optimisation. Clinical IMRT planning with the Radionics XPlan system for micro-multileaf collimator (MMLC) delivery has allowed for important lessons to be learned regarding the best beam and organ configurations prior to optimisation of beamlet weights. Important user-definable variables are beam directions, organ parameters (dose goals/penalties), and the margin (if any) around the planning target volume (PTV) used to aid coverage. Conventional stereotactic radiotherapy (SRT) treatments typically involve non-coplanar beams since there is often an advantage in terms of cranial organ at risk (OAR) sparing. IMRT can also benefit from such a configuration. The balance between target coverage and OAR sparing is largely controlled by user-defined goal doses and penalties. Once optimisation has been performed, intensity maps can be discretised into a selected number of levels. Less levels means less field segments and thus a shorter treatment time. Although IMRT beams attempt to spare structures which are in the 'beam's eye view' (BEV) of the target volume, sparing is greater if beams which minimise the involvement of OARs in their view are used. It has been found that the use of a margin is an effective way to ensure adequate PTV coverage. Alternatively the PTV penalties can be made larger. The best result is often obtained by the use of a 3-4 mm margin, whose penalty for underdosage is somewhat less than that for the PTV. Discretising the intensity maps to 4 or 5 levels is typically a good balance between shortening treatment time and not overly degrading the dose distribution. Beam configuration is still an important step in IMRT planning, even though optimisation of intensity maps is

  2. Approval plans issues and innovations

    CERN Document Server

    Katz, Linda S

    2013-01-01

    How can you, as an acquisition librarians, keep current on the output of hundreds of publishers? The answer, of course, is that you cannot. For over 30 years, approval plans have been used by librarians to acquire current titles, save staff time, and build core collections. Even today, these reasons seem appropriate, as libraries try to maintain up-to-date collections and control personnel and operating budgets. However, as shown in Approval Plans: Issues and Innovations, the use of approval plans is not so simple and straightforward; their use is subject to complex procedures and policies--an

  3. Introduction - AABFJ Financial Planning Special Issue 2009

    Directory of Open Access Journals (Sweden)

    Ciorstan J. Smark

    2009-03-01

    Full Text Available This special issue draws on recent work of financial planning specialists, finance specialists and economists todocument some of the trends, perception and challenges of financial planning in 2009. This diversity ofcontributors reflects the diversity and the multiplicity of influences that impact on financial planning.

  4. Issues for a Model of Language Planning.

    Science.gov (United States)

    Bamgbose, Ayo

    1989-01-01

    Examines the following issues as they relate to a model of language planning: (1) types of decisions (policy or implemental, higher- or lower-level, rational or arbitrary); (2) the planning mechanism; (3) the role of fact finding (prepolicy, preimplementation, and intraimplementation); (4) levels of planning; and (5) the nature of status versus…

  5. Editorial: Special Issue on Financial Planning

    Directory of Open Access Journals (Sweden)

    Mark Brimble

    2012-11-01

    Full Text Available AbstractThe special edition presents current research in the area of financial planning. With the continual upheaval inglobal financial markets (including Australia, the general trend towards self-funded retirement and lessreliance on the state, financial crises and the continual regulatory changes in the financial markets, this issue istimely and topical. This is the third special edition on financial planning, providing an excellent outlet forquality research in financial planning.

  6. Implementation Issues for Departure Planning Systems

    Science.gov (United States)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  7. [Haikou issues circular on planned parenthood].

    Science.gov (United States)

    1981-02-03

    The Organization Department of the Haikou Municipal CCP Committee, the municipal grain, finance, commerce, education bureau, personnel, public security, labor, civil affairs, public health, and housing bureaus, supply and marketing cooperative, and planned parenthood office recently issued a joint circular on implementing the provincial planned parenthood regulations. The circular demanded that the marriage registration and census system be seriously implemented. When people are registering for marriage, we must teach them to have only 1 child. We must give priority in housing and employment to an only child and his parents. When commercial, supply, and marketing departments are distributing coupons for fuel, and nonstaple food, they should supply a double amount to the only child. We must carry out serious health care for an only child and give them regular physical check-ups. When they are ill, hospitals should give them priority in registration, treatment, reservation of beds and medicines. The circular reiterated: We must seriously implement the stipulations on rewards and punishments contained in the provincial planned parenthood regulations. Cadres, staff, or workers who apply to have only 1 child must be given lump sums in addition to enjoying the relevant rewards stipulated by the regulations. Cadres, staff, workers, inhabitants, and commune workers who depend on state grain who violate the regulations must be punished according to the regulation. As for those who have 3 or more than 3 children, a 2nd child without planning, or an illegitimate child, the child's grain ration will be sold at negotiated price up to the age of 14. The grain department will distribute to them a supply ticket for negotiated price grain to buy grain in assigned grain shops. full text

  8. [Tianjin issues decision on family planning].

    Science.gov (United States)

    1981-05-08

    The Tianjin Municipal People's Government (China) recently issued a decision on family planning issues regarding encouragement of late childbirth and controlling the birth of a 2nd child. The decision indicated that newlyweds who decide to have their 1st child when they are at least 25 years old will be regarded as practicing late childbirth. A total of 34 days will be added to the present 56-day maternity leave for those newlyweds practicing late childbirth. Some prerequisites for having a 2nd child include the following: the 1st child has a nonhereditary deformity; of a newly married couple, for 1 party this is a 1st marriage while the other party has only 1 child from his or her previous marriage; and a married woman who has a medical certificate on sterility issued by medical and health units at or above the district level and has adopted a child with the approval of departments concerned is now allowed to have a 2nd child. To have a 2nd child without official approval is considered as giving birth to an unplanned child. Each parent of an unplanned child has to pay a special levy for 5 years from the day the child is born. If the interval between the 1st child and the 2nd child of a woman is less than 4 years, this woman and her husband will have to pay the special levies for 5 years and will have to pay levies to make up for the deficiencies caused by the insufficient interval between their 1st and 2nd child. Due to the great differences in economic conditions existing in the rural counties, every rural county People's Government may formulate its own stipulations concerning the length and amount of levies in accordance with local conditions.

  9. Gender issues in planning with water

    Science.gov (United States)

    Bostenaru-Dan, Maria; Olga Gociman, Cristina

    2016-04-01

    buildings are endangered by demolition. At the same time, for water heritage, women built or are users of remarcable buildings. Some of these, as in case of hazards, need to take gender issues in consideration (ex. bath resorts). These are relevant for urban planning analysis by means of dedicated programmes such as SpaceSyntax. European programmes such as H2020 try to adapt their policies for gender, including in Security calls. In the genderSTE group we worked towards women and water issues in such calls policy, and there are couple of related initiatives as well which will be shown.

  10. Major issues on establishing an emergency plan in nuclear facilities

    International Nuclear Information System (INIS)

    Chen, Zhu-zhou

    1988-03-01

    Several major issues on emergency planning and preparation in nuclear facilities were discussed -- such as the importance of emergency planning and preparation, basic principles of intervention and implementation of emergency plan and emergency training and drills to insure the effectiveness of the emergency plan. It is emphasized that the major key point of emergency planning and response is to avoid the occurrence of serious nonrandom effect. 12 refs., 3 tabs

  11. Legal issues in cash balance pension plan conversions.

    Science.gov (United States)

    Forman, J B

    2001-01-01

    Replacing a traditional pension with a cash balance plan raises a number of complicated and unsettled legal issues, including the protection of accrued benefits, the rate of benefit accrual, age discrimination and notice requirements. This article discusses those issues and concludes that routine conversions to cash balance plans appear to be legal both currently and into the foreseeable future.

  12. Current issues and strategies for transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Isaacs, A.L. [Electranix, Winnipeg, MB (Canada); Rajapakse, A. [Manitoba Univ., Winnipeg, MB (Canada)

    2008-07-01

    Following the widespread deregulation of the electric power industry in the early 1990s, significant changes occurred in the regulatory and planning environments of the industry. Several regions of North America remain fully or partially regulated in the traditional sense including most Canadian provinces, except for Alberta and Ontario. Although the Mexican system has separate generation and transmission companies and current restructuring efforts are underway, all companies are state-owned, and private investment in energy is heavily constrained by the Mexican constitution. In these regulated regions, traditional generation and transmission expansion planning methods remain in use. This paper presented an overview of current trends in transmission planning strategies that have evolved in response to the restructuring of the power industry, and a conceptual framework of a procedure that would guide planners faced with the challenges of incorporating large scale wind generation in deregulated environments. The paper provided background information on the effect of deregulation on transmission planning. Planning strategies that were discussed included quantifying risk to help identify best alternatives; use of reference systems to estimate generator costs and reduce uncertainty; project based transmission expansion; transmission construction ahead of generation; and generation ahead of transmission. The impact of wind on transmission planning as well as future work addressing challenges posed by wind were also addressed. Research is continuing in this area to illustrate the concepts proposed through a detailed case study. 15 refs., 2 figs.

  13. Socioeconomic assessment: issues, status, and plans

    International Nuclear Information System (INIS)

    Boryczka, M.K.

    1983-01-01

    Numerous public meetings and hearings have been held in Texas, Mississippi, Louisiana and Utah on the issue of siting a nuclear waste repository in salt. Citizens in these potential site areas have raised many questions about how this facility will affect their quality of life. Questions about population and economic changes have been of particular concern. In developing a socioeconomic program, these issues and others have been an integral part of Battelle's socioeconomic studies. The three elements of Battelle's socioeconomic program are comprised of three elements: impact assessment, impact mitigation and community development, and impact monitoring. In addition, our approach to assessing socioeconomic impacts for the environmental assessment (EA) required by the Nuclear Waste Policy Act of 1982 are described. Since the EA analysis will address many of the issues raised in the site areas, these concerns will be elaborated on. Finally, various techniques for managing socioeconomic impacts will be presented. 6 references, 1 figure

  14. Public Voucher Plans. Trends and Issues.

    Science.gov (United States)

    Hadderman, Margaret

    This document provides an overview of public-school voucher plans. Educational vouchers originated in the 1960s when Milton Friedman argued that vouchers would improve educational efficiency. Parents would receive the equivalent of per-pupil expenditures in the form of vouchers that could then be used at any school, either public and private. But…

  15. Liquidity-related plan asset issues.

    Science.gov (United States)

    Murphy, B B; Johnson, M K; Zorn, W P

    2000-12-01

    By about 2025, most baby boomers will have retired, which will put a tremendous strain on public sector pension plans. Many will experience negative cash flows, and liquidity will be an increasing concern. Asset/liability studies can help measure the effect of this risk on system funding and contribution requirements, resulting in more informed asset allocation choices and benefit policies.

  16. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  17. Integrating Gender Issues in Recovery and Reconstruction Planning

    OpenAIRE

    World Bank

    2011-01-01

    This note on integrating gender issues in recovery and reconstruction planning is the fifth in a series of guidance notes on gender issues in Disaster Risk Management (DRM) in East Asia and Pacific region. There are number of key challenges that women face in different elements of post disaster risk reconstruction and recovery. This note addresses the following bottlenecks: a) housing, lan...

  18. Program plan for the resolution of tank vapor issues

    International Nuclear Information System (INIS)

    Osborne, J.W.

    1992-09-01

    The purpose of this document is to provide a detailed description of the priorities, logic, work breakdown structure (WBS), task descriptions, and program milestones required for the resolution of tank vapor issues associated with the single-shell tanks (SST) and double-shell tanks (DST). The primary objective of this plan is to determine whether a health (personnel exposure) and/or safety (flammability) hazard exists. This plan is focused upon one waste tank, 241-C-103, but contains all elements required to bring the vapor issues to resolution

  19. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  20. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  1. PFP issues/assumptions development and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Issues/Assumptions Development and Management Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of an Issues/Assumptions Management List for the Plutonium Finishing Plant (PFP) integrated project baseline. Revisions to this document will include, as attachments, the most recent version of the Issues/Assumptions Management List, both open and current issues/assumptions (Appendix A), and closed or historical issues/assumptions (Appendix B). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Revisions that suggest improved processes will only require PFP management approval

  2. The Online Catalog: Issues in Planning and Development.

    Science.gov (United States)

    Richards, Timothy F.

    1984-01-01

    Discusses key issues to be addressed in planning for introduction of online public access catalog in academic research library environment. Purpose of catalog, reasons to adopt catalog, user behavior, use of catalog records, authority control, shared or unique systems, and impact on staff are highlighted. Seventy-three sources are cited. (EJS)

  3. Issues in Governance, Planning and Coordination. Staff Report No. 8.

    Science.gov (United States)

    Montana Commission on Post-Secondary Education, Helena.

    This brief report consists of a series of observations on governance, planning, and coordination in Montana postsecondary education. It offers an impressionistic overview of three selected issues: the regents and the 1972 Constitution (background, governance, accountability, and legal protection); Governance of Vocational-Technical Centers (the…

  4. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  5. Nuclear weapons modernization: Plans, programs, and issues for Congress

    Science.gov (United States)

    Woolf, Amy F.

    2017-11-01

    The United States is currently recapitalizing each delivery system in its "nuclear triad" and refurbishing many of the warheads carried by those systems. The plans for these modernization programs have raised a number of questions, both within Congress and among analysts in the nuclear weapons and arms control communities, about the costs associated with the programs and the need to recapitalize each leg of the triad at the same time. This paper covers four distinct issues. It begins with a brief review of the planned modernization programs, then addresses questions about why the United States is pursuing all of these modernization programs at this time. It then reviews the debate about how much these modernization programs are likely to cost in the next decade and considers possible changes that might reduce the cost. It concludes with some comments about congressional views on the modernization programs and prospects for continuing congressional support in the coming years.

  6. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  7. Education issues in disaster medicine: summary and action plan.

    Science.gov (United States)

    Armour, S J; Bastone, P; Birnbaum, M; Garrett, C; Greenough, P G; Manni, C; Ninomiya, N; Renderos, J; Rottman, S; Sahni, P; Shih, C L; Siegel, D; Younggren, B

    2001-01-01

    Change must begin with education. Theme 8 explored issues that need attention in Disaster Medicine education. Details of the methods used are provided in the introductory paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The chairs then presided over a workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) formal education, (2) standardized definitions, (3) integration, (4) evaluation of programs and interventions, (5) international cooperation, (6) identifying the psychosocial consequences of disaster, (7) meaningful research, and (8) hazard, impact, risk and vulnerability analysis. Three main components of the action plans were identified as evaluation, research, and education. The action plans recommended that: (1) education on disasters should be formalized, (2) evaluation of education and interventions must be improved, and (3) meaningful research should be promulgated and published for use at multiple levels and that applied research techniques be the subject of future conferences. The one unanimous conclusion was that we need more and better education on the disaster phenomenon, both in its impacts and in our response to them. Such education must be increasingly evidence-based.

  8. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  9. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  10. Population issues in economic planning: uses of demography in business.

    Science.gov (United States)

    Graham, R J

    1984-01-01

    Economists use demography in planning and forecasting business needs. As a bank, Westpac uses the information for its own internal business purposes and to assess general economic trends. Externally, the bank is expected by government and the public to have some authoritative views on the state of the economy. To form these views, it is necessary to understand a very wide array of statistical indicators, including demographic statistics. The main population issues of concern are: size, location, and changes in the population of Australia as a whole and by State; labor force (including projections); age profile of Australia and by State. The major source for this information is the Australian Bureau of Statistics. More detailed patterns often emerge, particularly for individual States, from papers prepared by others. This information is used by Westpac in 3 main planning areas and 2 broad assessment areas: planning -- location of bank branches, products/services offered, and marketing of products/services; and assessment -- economic outlook (labor force, housing needs, demand for funds) and specific industries. Recently, Westpac restructured its organization to cater to the changing needs of customers and the changing geographic patterns of population spread. The bank now has 4 major groups: retail financial services for personal and commercial markets; corporate and international; management services; and group planning (includes economic department). To offer products that fit the market, the bank needs to know the characteristics of the population by age, spending patterns, lifestyle preferences, and investment needs. Within Australia, a relatively new service offered by most financial institutions, which is directly related to population issues, is a counseling service for retirees. Westpac has a product called Club 55, which is a package of services designed for persons who have retired or are planning to retire. Another clearly perceived community need is for

  11. The vital issues process: Strategic planning for a changing world

    Energy Technology Data Exchange (ETDEWEB)

    Engi, D.; Glicken, J.

    1995-05-01

    The Vital Issues process (VIp) is a strategic planning tool initially developed by Sandia National Laboratories (SNL) for the Office of Foreign Intelligence (OFI)* of the US Department of Energy (DOE). It was further developed and refined through its application to a variety of strategic purposes for a range of public and semipublic organizations. The VIp provides a structured mechanism for assisting organizations in accomplishing specified objectives by identifying and prioritizing a portfolio of strategic issues, programmatic areas, or responses to a specified problem. It employs day-long panel meetings in a specified format to elicit a broad range of perspectives on a particular issue in a nonconfrontational manner and to facilitate the interaction and synthesis of diverse viewpoints on a specific topic. The VIp is unique in its incorporation of two primary approaches in each panel session: a qualitative or transactional segment, which entails the synthesis of the alternatives through negotiations or discussion, and a quantitative or net benefit maximization segment, an analytical approach, which involves prioritization of the alternatives using pairwise comparisons. This combination of facilitated group discussion and quantitative ranking provides input to strategic management decisions in the form of stakeholder-defined and -prioritized items as well as information on potential barriers to the implementation of policies and programs. This is the final volume in the series Identifying Vital Issues: New Intelligence Strategies for a New World, a three-volume set that gives an accounting of the VIp as implemented for OFI. This volume provides an in-depth description of the methodology used in the VIp.

  12. Issues in regional planning and development in Nigeria

    Directory of Open Access Journals (Sweden)

    Oladayo Ramon Ibrahim

    2017-10-01

    Full Text Available Till date,Nigeria can not boast of a specific, well-formulated, clear regional development policy framework despite several urban planning, development and governance initiatives including passage of regulations at both federal and state government levels that have been undertaken since independence by successive post- colonial governments. Most of the country's claims of regional development are products of other policies, and intentions, which do not have any bearing on, deliberate regional planning policies. Policy and decision-making on development planning often do not incorporate the implications of the ways in which we use land and the consequences for different places (economic planning. The neglect of place, in particular, the way that different policies combine to affect places in different ways (regional planning, has contributed to a range of negative economic, social and environmental outcomes. This paper relies mainly on the secondary data and literature exploration to demonstrate that the little role accorded to spatial planning, especially, regional planning, in the development efforts is largely responsible for the underdevelopment, imbalance, and inequalities in the country, as well as poverty of the citizens. The conclusion of the paper is that regional planning should be an integral part and complementary to economic planning in the national development planning of the country. For regional planning to aid in the development of the country and promote the well-being of the citizens, appropriate recommendations have been included in the paper.

  13. Issues of governance in water resource management and spatial planning

    NARCIS (Netherlands)

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial

  14. Planning, Promoting and Passing School Tax Issues. [Revised Edition].

    Science.gov (United States)

    Whitman, Robert L.; Pittner, Nicholas A.

    This book provides Ohio citizens with information on school tax issues and levy campaigning. The material is presented in a structural step-by-step process that lends itself to the practical application for preparing a levy. This book is a guide to understanding various tax issues, tax reduction factors, and the changing tax duplicate that affects…

  15. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  16. The Capacity to Integrate and Deal with Environmental Issues in Local Transport Policy and Planning

    DEFF Research Database (Denmark)

    Hansen, Carsten Jahn

    2002-01-01

    The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes.......The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes....

  17. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Blanchfield, Luisa

    2008-01-01

    ...." The Mexico City policy denies U.S. funds to foreign nongovernmental organizations (NGOs) that perform or promote abortion as a method of family planning -- even if the activities are undertaken with non-U.S. funds...

  18. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Nowels, Larry; Veillette, Connie

    2006-01-01

    .... international family planning programs. In 1984, controversy arose over U.S. population aid policy when the Reagan Administration introduced restrictions, which became known as the "Mexico City policy...

  19. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Blanchfield, Luisa

    2008-01-01

    .... international family planning programs. In 1984, controversy arose over U.S. population aid policy when the Reagan Administration introduced restrictions, which became known as the "Mexico City policy...

  20. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Nowels, Larry; Veillette, Connie

    2006-01-01

    Since 1965, U.S. policy has supported international population planning based on principles of volunteerism and informed choice that gives participants access to information on all methods of birth control...

  1. International Population Assistance and Family Planning Programs: Issues for Congress

    National Research Council Canada - National Science Library

    Blanchfield, Luisa

    2008-01-01

    Since 1965, the U.S. Government has supported international population planning based on principles of volunteerism and informed choice that gives participants access to information on all methods of birth control...

  2. Issues of governance in water resource management and spatial planning

    OpenAIRE

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial management. To accomplish this, the Metropolitan Area of São Paulo (MASP) was analysed as a case study, in order to demonstrate the challenges met by public administrators and planners regarding the ...

  3. Critical Issues in Language and Education Planning in Twenty First Century in South Africa

    Science.gov (United States)

    Brook Napier, Diane

    2011-01-01

    Language and education planning issues and democratic policy implementation in the post-apartheid era in South Africa encompass a range of language-related issues and dilemmas that have counterparts in many countries, within the emerging global education system. The issues in South Africa were and continue to be shaped by the historical legacy of…

  4. International Population Assistance and Family Planning Programs: Issues for Congress

    Science.gov (United States)

    2008-07-24

    activities and USAID began to purchase contraceptives for distribution through its programs in the developing world. The first International Population...agenda of initiatives that include the promotion of gender equality, increasing adolescent education on sexuality and reproductive health, and...maintains family planning projects in more than 60 countries that include counseling and services, training of health workers, contraceptive supplies and

  5. Cost estimating issues in the Russian integrated system planning context

    International Nuclear Information System (INIS)

    Allentuck, J.

    1996-01-01

    An important factor in the credibility of an optimal capacity expansion plan is the accuracy of cost estimates given the uncertainty of future economic conditions. This paper examines the problems associated with estimating investment and operating costs in the Russian nuclear power context over the period 1994 to 2010

  6. Community College Budgeting and Financial Planning Issues: A Case Study

    Science.gov (United States)

    Krieger, Jennifer

    2011-01-01

    Soon after his election in 1995, Kentucky governor Paul E. Patton instituted a plan to restructure the commonwealth's system of postsecondary education to create a more efficient system designed to prepare Kentuckians for jobs in the new era. While Patton looked at all of postsecondary education, he focused on the 29 community and technical…

  7. Science and technology planning in LDCs: major policy issues

    Energy Technology Data Exchange (ETDEWEB)

    Wionczek, M S

    1979-05-01

    Science in the less-developed countries (LDCs) should be underplanned rather than overplanned. Furthermore, the planning should be directed to the outer fringes of the scientific endeavor and to its infrastructure and not to the substance of scientific research itself. Planning of applied research and technological development in the LDC is another story. It cannot be done without entering into the substantive problems of applied research and technological development. Attempts to set the broad overall national targets for science and technology (S and T) expenditures -in terms of the proportion of the (GNP) or the per capita income- which do not consider the science and technology system's financial and human resources absorption capacity, are useless. 8 references.

  8. Plan for addressing issues relating to oil shale plant siting

    Energy Technology Data Exchange (ETDEWEB)

    Noridin, J. S.; Donovan, R.; Trudell, L.; Dean, J.; Blevins, A.; Harrington, L. W.; James, R.; Berdan, G.

    1987-09-01

    The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 figs., 30 tabs.

  9. Urban Change: An Overview of Research and Planning Issues

    OpenAIRE

    Korcelli, P.

    1980-01-01

    Three sets of urban policy issues are identified in this paper. These relate to the growth and contraction of metropolitan areas, their changing role in the settlement systems, and their internal organization. Policy-oriented urban models are briefly reviewed. It is concluded that promising research approaches refer to: (a) innovation diffusion and urban growth cycles, (b) interurban migration and demographic change, and (c) spatial interaction within urban regions. These findings are then tr...

  10. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  11. The Share of Preservation Issues when Planning a Library Building

    Directory of Open Access Journals (Sweden)

    Marie-Thérèse Varlamoff

    2002-07-01

    Full Text Available Primarily and historically a library was a place where books or manuscripts were kept. „ Thékos” means warehouse or storage area in Greek. But nowadays a library is more than a depository. It is also a place where you can read books and access the information they contain. In the case of a new building or of the rehabilitation of an old building it might also serve as a showcase for politicians or decision makers. Hence the necessity to combine preservation issues, accessibility and architecture.

  12. Environmental issues in planning building energy efficiency R and D

    International Nuclear Information System (INIS)

    Farhar, B.C.

    1990-01-01

    The US Department of Energy's Office of Building Technologies (OBT) has initiated analyses on the relationship and impact of buildings energy conservation on the environment. A plethora of activities involving DOE, its national laboratories and other organizations are addressing various aspects of global climate change, acid rain, stratospheric ozone depletion, and indoor air quality. Elements of the current task include (1) a literature review of buildings' contribution to these problems; (2) inventories of OBT studies directly and indirectly related to these environmental problems, and other germane DOE and non-DOE projects; (3) identifying OBT projects that should be done; and (4) analyzing differential impacts on the environment of alternative OBT planning strategies and varying National Energy Strategy scenarios. The success of this project relies, at least in part, on suggestions from the buildings research community on information sources, literature, and ideas that OBT should consider

  13. Landslides along Highways: GIS-based Inventory and Planning Issues

    Science.gov (United States)

    Jaeger, Ann-Kathrin; Klose, Martin; Damm, Bodo

    2015-04-01

    Highways rank as critical transportation infrastructures that are at risk of landslides in many areas worldwide (e.g., Hungr et al., 1999; Bhandary et al., 2013). Safe and affordable operations of traffic routes constitute the two main criteria for transportation planning in landslide-prone terrain. A right balancing of these often conflicting priorities requires profound knowledge of landslide locations across highway networks and the costs caused by landslides in the past (e.g., Saha et al., 2005). Much of the direct costs affecting transportation departments relate to capital investments for landslide repair or mitigation and operational expenditures in connection with maintenance works. A systematic collection and inventory of such data sets combined with an acquisition of hazard information on vulnerable road sections is still rarely the case in engineering practice. This is despite significant cost impacts and budgetary burdens, especially in peripheral mountain areas where financial resources are naturally limited (e.g., Klose et al., 2014). The present contribution introduces a regional inventory of landslides along highways in the Harz Mountains, NW Germany. As subset of a landslide database for the entire country, this focused GIS-based inventory has been compiled in close collaboration with the Lower Saxony Department of Transportation. The inventory includes data sets gathered by archive studies and relies on high-quality information sources such as maintenance protocols, geotechnical reports, and documents from tendering, controlling, and accounting. A mapping tool in ArcGIS format is used to specify and visualize road sections affected by landslides. This spatial information on hazard exposure is complemented by narrative risk profiles for landslide sites showing a long history of damage events. By summarizing the occurrence dates of landslides, the associated damages, and the types and costs of repair or prevention, such risk profiles are useful to

  14. Malthusian paradigm and the issue of compulsion in family planning.

    Science.gov (United States)

    Pethe, V P

    1982-01-01

    Addresses the question of whether Malthus, were he alive today, would support compulsory family planning (a policy generally referred to as "Malthusian"). The neomalthusian position is basically that the race between population growth and development of resources, especially food supply, is highly unequal; poverty and stagnation are the inevitable outcome. Population growth must therefore be curbed by whatever means are available, through legal compulsion if necessary. A number of statements from Indian government sources during the mid 1970s, with regard to sterilization, are offered as illustrations. The Malthusian paradigm described has been subjected to severe criticism, which leads to questions about its validity as a justification for compulsory sterilization. Malthus distinguished between policy measures for control of population, rejecting all but the moral restraint implied in postponement of marriage. Thus, like Gandhi, he rejected the belief that the ends justify the means. The Malthusian basis is seen as untenable for 3 reasons: it is erroneous (science and technology have nullified the thesis of over population as the cause of poverty); it is dangerous (treating symptoms rather than the disease); it is inadequate, leaving out variables other than the economic from its analysis. Malthus the moralist would have rejected compulsion, and the use of his paradigm to justify such a policy does him an injustice.

  15. Program plan for the resolution of tank vapor issues

    International Nuclear Information System (INIS)

    Osborne, J.W.; Huckaby, J.L.

    1994-05-01

    Since 1987, workers at the Hanford Site waste tank farms in Richland, Washington, have reported strong odors emanating from the large, underground high-level radioactive waste storage tanks. Some of these workers have complained of symptoms (e.g., headaches, nausea) related to the odors. In 1992, the U.S. Department of Energy, which manages the Hanford Site, and Westinghouse Hanford Company determined that the vapor emissions coming from the tanks had not been adequately characterized and represented a potential health risk to workers in the immediate vicinity of the tanks. At that time, workers in certain areas of the tank farms were required to use full-face, supplied-breathing-air masks to reduce their exposure to the fugitive emissions. While use of supplied breathing air reduced the health risks associated with the fugitive emissions, it introduced other health and safety risks (e.g., reduced field of vision, air-line tripping hazards, and heat stress). In 1992, an aggressive program was established to assure proper worker protection while reducing the use of supplied breathing air. This program focuses on characterization of vapors inside the tanks and industrial hygiene monitoring in the tank farms. If chemical filtration systems for mitigation of fugitive emissions are deemed necessary, the program will also oversee their design and installation. This document presents the plans for and approach to resolving the Hanford Site high-level waste tank vapor concerns. It is sponsored by the Department of Energy Office of Environmental Restoration and Waste Management

  16. Recent Movement, Issues and Some Counter plans in Nuclear Industry

    International Nuclear Information System (INIS)

    Lee, S. K.; Lee, J. K.; Cho, C. S.; Lee, C. C.; Park, C. O.

    2007-01-01

    There is no doubt 'Nuclear Energy' is the only source that can ensure the world's steady development in the foreseeable future. Nowadays is definitely what is called 'renaissance of nuclear.' As energy demand and economy increase, and global climate warms, the trend of nuclear dependency will be accelerated further. With 30 reactors being built around the world today, another 35 or more planned to come online during the next 10 years, and over two hundred further back in the pipeline, the global nuclear industry is clearly going forward strongly. Countries are seeking to replace old reactors as well as expand capacity, and an additional 25 countries are either considering or have already decided to make nuclear energy part of their power generation capacity. On the other hand, as current movement of world nuclear field, Korea has faced to one of the most important times since introducing nuclear power. Twenty nuclear power plants are run in Korea i.e. sixteen PWRs and four PHWRs now, and the capability of nuclear power production has been ranked world number six. In spite of this grand appearance, however, the influencing power on world nuclear society is not well matched to its status since it does not have a special hidden card which can appeal and impact on international community. In the era of nuclear renaissance, paradoxically, Korea is not in the situations of optimistic or pessimistic view. Now let's As energy demand and economy increase, and global climate warms, the trend of nuclear dependency will be accelerated further. With 30 reactors being built around the world today, another 35 or more planned to come online during the next 10 years, and over two hundred further back in the pipeline, the global nuclear industry is clearly going forward strongly. Countries are seeking to replace old reactors as well as expand capacity, and an additional 25 countries are either considering or have already decided to make nuclear energy part of their power generation

  17. The site-characterization plan and its role in resolving siting and licensing issues

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1986-01-01

    As required by the Nuclear Waste Policy Act and the Nuclear Regulatory Commission (NRC) in 10 CFR Part 60, the Department of Energy is preparing plans for conducting site characterization at three candidate sites. Prepared according to a detailed annotated outline that is based on the NRC's Regulatory Guide 4.17, these plans will present the information collected to date about the geologic, hydrologic, geochemical, geoengineering, and climatic conditions of each site; describe the design of the repository and the waste package; and discuss the site-characterization program. The most important portions of the plan will be the strategy for resolving siting and licensing issues and the description of the testing and analysis program to be followed in resolving these issues. The issues-resolution strategy consists of identifying issues and the associated information needs; allocating performance goals for various components of the repository system; developing a testing plan to gather the necessary information; gathering and analyzing the information; and documenting the results for use in site selection and licensing. The issues-resolution strategy will allow the Department to define all of the issues that must be resolved in order to demonstrate compliance with applicable regulations and to specify the information needed to resolve these issues. It will provide a consistent framework and establish priorities for the Department's site-characterization effort for the next several years

  18. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  19. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  20. Quality Assurance/Quality Control Issues for Intraoperative Planning and Adaptive Repeat Planning of Image-Guided Prostate Implants

    International Nuclear Information System (INIS)

    Zaider, Marco; Cohen, Gilad; Meli, Jerome; Rosenfeld, Anatoly B.

    2008-01-01

    The quality assurance/quality control purpose is this. We design a treatment plan, and we wish to be as certain as reasonably possible that the treatment is delivered as planned. In the case of conventionally planned prostate brachytherapy, implementing to the letter the implantation plan is rarely attainable and therefore can require adaptive replanning (a quality control issue). The reasons for this state of affairs include changes in the prostate shape and volume during implantation and treatment delivery (e.g., edema resolution) and unavoidable inaccuracy in the placement of the seeds in the prostate. As a result, quality-control activities (e.g., the need to monitor-ideally, on the fly-the target and urethral and rectal dosage) must be also addressed

  1. High-heat tank safety issue resolution program plan. Revision 2

    International Nuclear Information System (INIS)

    Wang, O.S.

    1994-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank 241-C-106. The heat source of approximately 110,000 Btu/hr is the radioactive decay of the stored waste material (primarily 90 Sr) inadvertently transferred into the tank in the later 1960s. Currently, forced ventilation, with added water to promote thermal conductivity and evaporation cooling, is used for heat removal. The method is very effective and economical. At this time, the only viable solution identified to permanently resolve this safety issue is the removal of heat-generating waste in the tank. This solution is being aggressively pursued as the only remediation method to this safety issue, and tank 241-C-106 has been selected as the first single-shell tank for retrieval. The current cooling method and other alternatives are addressed in this program as means to mitigate this safety issue before retrieval. This program plan has three parts. The first part establishes program objectives and defines safety issue, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and other alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. A table of best-estimate schedules for the key tasks is also included in this program plan

  2. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    International Nuclear Information System (INIS)

    Banaee, J.

    2002-01-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances

  3. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Banaee, J.

    2002-05-16

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  4. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Banaee, Jila

    2002-08-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  5. Development of Lesson Plans and Student Worksheets Based Socio-Scientific Issues on Pollution Environmental Topic

    Science.gov (United States)

    Rahayu, S.; Meyliana, M.; Arlingga, A.; Reny, R.; Siahaan, P.; Hernani, H.

    2017-09-01

    The aim of this study is to develop lesson plans and student worksheets based socio-scientific issues on pollution environmental topic for seventh-grade junior high school students. Environmental pollution topic split into several subtopics namely air pollution, water pollution and soil pollution. The composing of lesson plans were developed based on socio-scientific issues with five stages, namely (1) Motivate; (2) Challenge; (3) Collect scientific evidence; (4) Analyse the evidence; (5) Build knowledge and make connections; and (6) Use evidence. While student worksheets contain articles on socio-scientific issues, practice, and there are a few questions to determine students’ reasoning. The method that is used in this research is research and development (R & D method). Development model used in this study is a model of Plomp that consists of four stages, namely: (1) Initial Research; (2) Design; (3) Realization or Construction; (4) Testing, evaluation and revision; (5) Implementation, while the research was limited to the fourth stage. Lesson plans and student worksheets based on socio-scientific issues was validated through an expert validation. The result showed that lesson plans and student worksheets based socio-scientific issues on pollution theme have a very decent and be able to apply in science classroom.

  6. The gender issue in energy project planning. Welfare, empowerment or efficiency?

    NARCIS (Netherlands)

    Skutsch, Margaret

    1998-01-01

    The gap between gender policy as adopted by governments and donors, and the inclusion of gender issues in energy planning practice at project level, is great, despite the fact that there are many manuals available which demonstrate how to go about gathering gender-based data and analysing this. This

  7. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    Science.gov (United States)

    2017-02-02

    international relations and strategy of basic world geographic features such as the size and location of continents, oceans, and individual countries. From...Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Ronald O’Rourke Specialist in Naval Affairs February 2, 2017...

  8. THE NIGERIAN GAS MASTER-PLAN, INVESTMENT OPPORTUNITIES, CHALLENGES, ISSUES AFFECTING POWER SECTOR: AN ANALYSIS

    Directory of Open Access Journals (Sweden)

    R. INGWE

    2014-11-01

    Full Text Available The Nigerian Gas Master-Plan, Investment Opportunities, Challenges, Issues Affecting Power Sector: an Analysis. The objective of this article is to contribute towards understanding of the Nigerian Gas Master Plan (NGMP/Plan and its bifurcations with key socio-economic development factors. I applied the method of discourse to bring to being some points that have hitherto been unknown about the Master-plan and its inter-relationships and bifurcations. Elaborated here are the spectacular gains that have accrued to the Latin American country, Trinidad and Tobago, from its recent development of natural gas resources. This was considered suitable and significant here for highlighting that if such spectacular achievements could be realized from Trinidad and Tobago’s relatively smaller gas deposit (15.3 tcf, probable reserves (8.4 tcf, possible reserves (6.2 tcf would be by far greater considering Nigeria’s larger natural gas reserves (184 tcf wealth as earlier stated. I show that the Plan is well designed relevant to addressing Nigeria’s current development needs generally. It presents potentials for stimulating Nigeria’s economic growth by harnessing the country’s abundant natural gas reserves. The Plan enumerates/ elaborates huge investment opportunities. Some challenges likely to be faced in the implementation/management of the Plan are already being surmounted as recent reports show that some of its key investments have been realized and the required infrastructure are being provided. Regarding the issues in the Master-plan that are likely to affect and are affecting Nigeria’s power sector development, I reckon that they are mostly positive factors due to the way the plan promises to stimulate electricity generation in our country.

  9. I support renewable energy but : significant planning issues for wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Pausner, J [County of Grey, ON (Canada)

    2004-07-01

    This PowerPoint presentation examined the wind power project of Blue Highlands, located in Eastern Grey County, Ontario. The project, for which no approval has yet been obtained, involves 67 turbines (120-130 MW). The staff of the Niagara Escarpment Commission (NEC) has made the following recommendations concerning wind energy development projects: (1) the Niagara Escarpment Plan should not be the focus of large-scale industrial type wind power development, (2) wind power developments should be allowed only in certain portions of the Plan area, (3) permission may be granted for household or farm generators throughout the Plan, on a case-by-case basis, (4) the NEC should review proposals adjacent to Plan boundaries which may have a visual impact, and (5) conduct further reviews after major parks are constructed elsewhere. The author identified important planning issues such as environmental impacts, visual impacts, and noise. Policy implementation through zoning is dependent on defining terms and establishing requirements for setbacks, signage, accessory structures and facilities, height maximums, decommissioning provisions, and site planning. The author discussed data collection and dissemination, as well as mapping. The presentation concluded with proposals for policy development, where the author argued that everyone should play their part. Areas with high potential should be examined and development constrained in order to ensure the protection of existing incompatible uses. The public must be involved in locally based projects. Wind theft issue must be addressed. figs.

  10. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Science.gov (United States)

    2010-07-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  11. Strategic Research for S&T Planning Should Focus on Key Issues

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    @@ Strategic planning for national and CAS mid- and long-term S&T development should avoid giving equal attention to every aspect of an issue, which can only lead to incremental progress.Instead, importance should be attached to priorities that will result in scientific, technical and engineering breakthroughs, said CAS President Lu Yongxiang, who is also vice-chairman of the national legislature, NPC.

  12. Profit shifting and 'aggressive' tax planning by multinational firms: Issues and options for reform

    OpenAIRE

    Fuest, Clemens; Spengel, Christoph; Finke, Katharina; Heckemeyer, Jost; Nusser, Hannah

    2013-01-01

    This paper discusses the issue of profit shifting and ‘aggressive’ tax planning by multinational firms. The paper makes two contributions. Firstly, we provide some background information to the debate by giving a brief overview over existing empirical studies on profit shifting and by describing arrangements for IP-based profit shifting which are used by the companies currently accused of avoiding taxes. We then show that preventing this type of tax avoidance is, in principle, straightforward...

  13. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    Science.gov (United States)

    2016-03-17

    industrial base. Detailed coverage of certain individual Navy shipbuilding programs can be found in the following CRS reports:  CRS Report RS20643...U.S. Offset Strategy and its Implications for Partners and Allies, As Delivered by Deputy Secretary of Defense Bob Work, Willard Hotel , January 28...Contracting in Defense Acquisition : Background and Issues for Congress, by Ronald O’Rourke and Moshe Schwartz. Navy Force Structure and Shipbuilding Plans

  14. Public issues associated with planning a large diameter pipeline in a multi-use urban corridor

    Energy Technology Data Exchange (ETDEWEB)

    Buszynski, M. [SENES Consultants Ltd., Richmond Hill, ON (Canada)

    2004-07-01

    The demand for natural gas in a downtown area of Toronto is expected to increase significantly due to the proposed construction of two new generation stations. However, there are few opportunities to locate the pipelines in large urban centers because of the lack of foresight by municipalities and others in preserving corridors for utilities. Enbridge Gas conducted a system planning study to determine the best methods for overcoming public issues that were encountered while planning the route for a NPS 36 inch diameter natural gas pipeline in this urban region. In Ontario, distribution pipelines are regulated by the Ontario Energy Board, whose environmental guidelines for the location, construction and operation of hydrocarbon pipelines require the identification of indirectly affected landowners and detailed analysis of public issues and how they can be resolved. Issues include noise, vibration, dust and traffic. Secondary use of the electric transmission rights-of-way resulted in the identification of several other issues, including aesthetics of the right-of-way and loss of privacy for adjacent residential properties. It was determined that the optimal solution was to parallel a section of existing NPS 30 pipeline running in a north-south right-of-way located east of the Don Valley Parkway. The techniques used to address public issues identified 180 directly affected and 3,200 indirectly affected landowners. The Enbridge study revealed that it is possible to plan a right-of-way through an urban corridor in a manner that is compatible with existing development and that satisfies the general public. 6 figs.

  15. International Thermonuclear Experimental Reactor: Physics issues, capabilities and physics program plans

    International Nuclear Information System (INIS)

    Wesley, J.C.

    1997-01-01

    Present status and understanding of the principal plasma-performance determining physics issues that affect the physics design and operational capabilities of the International Thermonuclear Experimental Reactor (ITER) [ITER EDA Agreement and Protocol 2 (International Atomic Energy Agency, Vienna, 1994)] are presented. Emphasis is placed on the five major physics-basis issues emdash energy confinement, beta limit, density limit, impurity dilution and radiation loss, and the feasibility of obtaining partial-detached divertor operation emdash that directly affect projections of ITER fusion power and burn duration performance. A summary of these projections is presented and the effect of uncertainties in the physics-basis issues is examined. ITER capabilities for experimental flexibility and plasma-performance optimization are also described, and how these capabilities may enter into the ITER physics program plan is discussed. copyright 1997 American Institute of Physics

  16. Updated science issues and observation plans of BepiColombo Mercury Magnetosphere Orbiter (MMO)

    Science.gov (United States)

    Murakami, G.; Fujimoto, M.; Hayakawa, H.

    2017-12-01

    After the successful observation by the first Mercury orbiter MESSENGER ended in 2015, Mercury becomes one of the most curious planets to investigate. MESSENGER raised new science issues, such as the northward offset of planetary dipole magnetic filed, the highly dynamic magnetosphere, and the year-to-year constant exosphere. These outstanding discoveries still remain as open issues due to some limitations of instruments onboard MESSENGER and its extended elliptical orbit with apherm in southern hemisphere. The next Mercury exploration project BepiColombo will address these open issues. BepiColombo is an ESA-JAXA joint mission to Mercury with the aim to understand the process of planetary formation and evolution as well as to understand Mercury's extreme environment in the solar system. Two spacecraft, i.e. the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO), will be launched in October 2018 by an Ariane-5 launch vehicle and arrive at Mercury in December 2025. The mechanical test in a complete stack configuration has been performed in the ESA test center and successfully finished. MMO is mainly designed for plasma observations and is expected to extract essential elements of space plasma physics that become visible in the Hermean environment. MMO has large constraints on science operations, such as thermal issue and limited telemetry rate. Due to the thermal issue each science instrument cannot always be turned on. In addition, due to the low telemetry rate in average, only a part ( 20-30%) of science mission data with high resolution can be downlinked. Therefore, in order to maximize the scientific results and outcomes to be achieved by MMO, we are now working to optimize the science observation and downlink plans in detail. Here we present the updated science goals for MMO based on the latest MESSENGER results and the current observation plans how to approach these science issues.

  17. Resource planning for gas utilities: Using a model to analyze pivotal issues

    Energy Technology Data Exchange (ETDEWEB)

    Busch, J.F.; Comnes, G.A.

    1995-11-01

    With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.

  18. Policy planning for nuclear power: An overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1993-08-01

    This special report, Policy Planning for Nuclear Power: An Overview of the Main Issues and Requirements, has been prepared in response to the express request of a number of IAEA Member States for a document to assist makers in developing countries on the introduction of nuclear power. The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. Further information and details on the technical and other issues presented in this report are given in the list of related IAEA publications and documents at the end of this report

  19. Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan

    International Nuclear Information System (INIS)

    Savage, J.W.

    1982-01-01

    The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities

  20. Issues Facing Pharmacy Leaders in 2015: Suggestions for Pharmacy Strategic Planning

    Science.gov (United States)

    Weber, Robert J.

    2015-01-01

    Issues facing pharmacy leaders in 2015 include practice model growth and the role of pharmacy students, clinical privileging of health-system pharmacists and provider status, medication error prevention, and specialty pharmacy services. The goal of this article is to provide practical approaches to 4 issues facing pharmacy leaders in 2015 to help them focus their department’s goals. This article will address (1) advances in the pharmacy practice model initiative and the role of pharmacy students, (2) the current thinking of pharmacists being granted clinical privileges in health systems, (3) updates on preventing harmful medication errors, and (4) the growth of specialty pharmacy services. The sample template of a strategic plan may be used by a pharmacy department in 2015 in an effort to continue developing patient-centered pharmacy services. PMID:25717212

  1. Policy planning for nuclear power: an overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1995-05-01

    The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. (NHA)

  2. White plan and crisis management. Help guide for the elaboration of extended white plans and of white plans for health establishments. Issue 2006, appendix to circular nr DHOS/CGR/2006/401 of 2006 September 14

    International Nuclear Information System (INIS)

    2006-01-01

    White plans are specific emergency plans to be implemented in public and private health establishments. While introducing necessary modifications and taking public health policy effects into account, this document first defines crises and their management (levels of intervention from the local to the national level, typology of emergency plans, emergency medical chain, extended white plans). The second part proposes a set of sheets which aim to be a support in the elaboration of the extended white plan and of the white plan. The third part, based on professional contributions and lessons learned, addresses two important issues: firstly, the crisis management exercise, and secondly the hospital under tension and white plan triggering thresholds

  3. Workforce and planning issues for the profession of periodontics in Australia and New Zealand.

    Science.gov (United States)

    Brown, Louise; Seymour, Gregory; Holborow, Douglas

    2002-10-01

    The speciality of periodontics in Australia and New Zealand has seen steady growth since 1986, when the Australian and New Zealand Academy of Periodontics (ANZAP) was formed. Very few members of ANZAP have retired in the 16 years since its formation. However, the results of a survey of members revealed that one-third of members plan to retire within the next 10 years, and over 50% of members will have retired within 15 years. The survey also revealed that most members were heavily booked, and nearly half were concerned by their level of busyness. A total of 22 members are currently seeking to employ a periodontist in their practice, and yet only three students will complete the MDSc program in periodontics in Australia at the end of this year. This paper presents the results of the ANZAP survey of members and addresses issues affecting the training of periodontists in Australia and New Zealand.

  4. The problem involving OPMEs and the health plans contracts: outline and analysis of the issue

    Directory of Open Access Journals (Sweden)

    MARTINS, Paulo Roberto do Nascimento

    2016-06-01

    Full Text Available This paper has as its scope to introduce and analyze some of most polemic issues involving the indications of OPMEs within the health plans contracts. During the text, are exhibited normative elements related to this context, as well as some judicial decisions concerning this matter, aiming to defend, with reasonable grounds, that the indication of the patient’s doctor, when choosing prostheses and orthoses, cannot be taken as the unique nor necessarily the best opinion, given the existence of other interests, beyond the patient’s health, that are often in stake as well. At the end, it is explained that, in light of the currently existing regulation in Brazil, in the context of the supplementary health system, to the patient’s doctor is given the authority only to indicate the characteristics of the materials needed, leaving it to the health plans Operators the choice of the brand and the manufacturer. As long as the courts deny these rules, this serious problem will not be solved.

  5. Banner plans to issue new bonds to cover university of Arizona medical center purchase

    Directory of Open Access Journals (Sweden)

    Robbns RA

    2015-10-01

    Full Text Available No abstract available. Article truncated at 150 words. Modern Healthcare is reporting that Banner Health is issuing new bonds this week to refinance older debt (1. Banner financed the $1 billion purchase of the University of Arizona Health Network (UAHN including the University of Arizona Medical Center with a $700 million short-term loan from investment bank Mizuho in February. Banner is issuing $100 million in tax-exempt, fixed rate Series 2015A bonds. It is also planning to take on an additional $500 million in taxable and tax-exempt debt that will be used to replace the short-term loans associated with the purchase. Banner is focusing on how to improve the return on its UAHN investment, which has dragged down its earnings. UAHN's financial performance has deteriorated with an operating margin declining to -4.3% in fiscal 2014, down from -1.2% the previous fiscal year. Before that, UAHN was profitable, according to Banner Chief Financial Officer Dennis Dahlen. Banner reported an operating ...

  6. Approach to Issues in Planning and Operation of Railway BOT Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Xianghong; Chen Min

    2009-01-01

    As an internationally popular mode of public infrastructures' investment,construction and operation,BOT (build-operate-transfer) has been successfully applied in some countries and regions of the world for their infrastructures' construction and playing an important role in promoting the construction of public infrastructures.The Ministry of Railways clearly proposed in its Suggestions for Implementation of Encouraging,Supporting and Guiding Participation of Non-public-owned Economy in Railway Construction and Operation that it was necessary to study and take for reference multiple modes of public infrastructures'investment,construction and operation including BOT.It is more complicated and risky for the process of planning and operation of BOT projects.The paper takes for reference the domestic and foreign experiences in the operation of BOT projects,analyzes the issues that will arise such as risk control in implementing railway BOT projects,employment of professional consultants,financing coordination,tariff making,non-commercial subsidy,as well as operation and management,and puts forward corresponding suggestions for these issues.

  7. Landscape ecological assessment: a tool for integrating biodiversity issues in strategic environmental assessment and planning.

    Science.gov (United States)

    Mörtberg, U M; Balfors, B; Knol, W C

    2007-03-01

    To achieve a sustainable development, impacts on biodiversity of urbanisation, new infrastructure projects and other land use changes must be considered on landscape and regional scales. This requires that important decisions are made after a systematic evaluation of environmental impacts. Landscape ecology can provide a conceptual framework for the assessment of consequences of long-term development processes like urbanisation on biodiversity components, and for evaluating and visualising the impacts of alternative planning scenarios. The aim of this paper was to develop methods for integrating biodiversity issues in planning and strategic environmental assessment in an urbanising environment, on landscape and regional levels. In order to test developed methods, a case study was conducted in the region of Stockholm, the capital of Sweden, and the study area embraced the city centre, suburbs and peri-urban areas. Focal species were tested as indicators of habitat quality, quantity and connectivity in the landscape. Predictive modelling of habitat distribution in geographic information systems involved the modelling of focal species occurrences based on empirical data, incorporated in a landscape ecological decision support system. When habitat models were retrieved, they were applied on future planning scenarios in order to predict and assess the impacts on focal species. The scenario involving a diffuse exploitation pattern had the greatest negative impacts on the habitat networks of focal species. The scenarios with concentrated exploitation also had negative impacts, although they were possible to mitigate quite easily. The predictions of the impacts on habitats networks of focal species made it possible to quantify, integrate and visualise the effects of urbanisation scenarios on aspects of biodiversity on a landscape level.

  8. How public issues shape environmental restoration plans - experiences with Colorado UMTRA projects

    International Nuclear Information System (INIS)

    Hunt, B.; Monaghan, J.

    1991-01-01

    Federal environmental restoration plans are being significantly impacted by open-quotes grassrootsclose quotes public pressure and by community demands, some of which have little relation to the technical standards of remediation and which go well beyond authorizing legislation. These demands often represent significant additional project costs. A review of Uranium Mill Tailings Remedial Action (UMTRA) Program experiences in Colorado suggests that the more serious open-quotes grassrootsclose quotes issues associated with remediation rarely diminish and, in fact, will intensify over time. This presents program administrators with the dilemma of attempting to adhere to program mandates and keep projects within budget, while at the same time trying to be responsive to community concerns. Such high-profiled community debates have the ability to delay remediation and even jeopardize important projects. After prolonged public debate, when it becomes clear an issue will not dissipate, project officials may be forced to meet certain community demands. Often, this results in not only increased costs, but a loss of public confidence in clean-up efforts. Evidence also suggests, however, that when critical public issues can be identified and addressed before they become overly contentious, significant problems and controversy can be avoided; but, the situation is made difficult because project officials often lack the policy guidance to determine which, if any, community demands should be addressed and to what extent they should be met. The adoption of several key public policy principles by program administrators will provide a greater ability to address community demands in a timely and successful manner

  9. ALWR severe accident issue resolution in support of updated emergency planning

    International Nuclear Information System (INIS)

    Additon, Stephen L.; Leaver, David E.; Sorrell, Steven W.; Theofanous, Theo G.

    2004-01-01

    . The severe accident risk characteristics of the ALWRs reflect an emphasis on accident prevention, which is quantified in the URD as a maximum permissible core damage frequency of less than one occurrence in 100,000 reactor years. For severe accident sequences of a frequency lower than this criterion, the URD safety policy requires provisions to arrest, mitigate, and contain the accident and, accordingly, opportunities to terminate a core melt sequence are provided whenever practical at every stage of core degradation. This includes design provisions to maximize the chances of success for reflooding the reactor by depressurizing the primary system, provisions to ensure retention of core debris in the reactor vessel by cooling the outside of the reactor vessel, and provisions for a more favorable geometry for core debris cooling in the reactor cavity in order to slow and then terminate a core-concrete interaction. For all risk-significant branches of the containment event tree, it must be demonstrated that early containment failure is avoided. This paper addresses the severe accident issue resolution tasks which were undertaken by the U.S. ALWR Program and ARSAP to ensure that the capability of passive ALWRs to arrest, mitigate and contain severe accidents would be sufficient to justify a significant change in the appropriate emergency planning requirements. The next section summarizes all of the issue resolution activities that will culminate in the issuance by the U.S. Nuclear Regulatory Commission (NRC) of a Final Safety Evaluation Report for the passive ALWR URD, scheduled for January 1994. The following section addresses more recent activities undertaken by ARSAP to enhance the issue resolution basis and to provide additional confirmatory evidence supporting the URD criteria. Included are the ongoing activities to establish a technical case, if possible, for in-vessel retention for the passive PWR and for the accommodation of ex-vessel steam explosions in the

  10. Exploring factors influencing farmers' willingness to pay (WTP) for a planned adaptation programme to address climatic issues in agricultural sectors.

    Science.gov (United States)

    Ahmed, Adeel; Masud, Muhammad Mehedi; Al-Amin, Abul Quasem; Yahaya, Siti Rohani Binti; Rahman, Mahfuzur; Akhtar, Rulia

    2015-06-01

    This study empirically estimates farmers' willingness to pay (WTP) for a planned adaptation programme for addressing climate issues in Pakistan's agricultural sectors. The contingent valuation method (CVM) was employed to determine a monetary valuation of farmers' preferences for a planned adaptation programme by ascertaining the value attached to address climatic issues. The survey was conducted by distributing structured questionnaires among Pakistani farmers. The study found that 67 % of respondents were willing to pay for a planned adaptation programme. However, several socioeconomic and motivational factors exert greater influence on their willingness to pay (WTP). This paper specifies the steps needed for all institutional bodies to better address issues in climate change. The outcomes of this paper will support attempts by policy makers to design an efficient adaptation framework for mitigating and adapting to the adverse impacts of climate change.

  11. Procedural issues in the development of a production plan in the petroleum transport computerized system of plan projects

    Energy Technology Data Exchange (ETDEWEB)

    German, V T; Karlikov, Y P; Papeev, V M; Samorodkin, V D; Vasil' ev, Y I

    1980-01-01

    The process of planning petroleum transportation must be described by a model that may be used to vary the distribution of the volumes of oil transported and to organize the oil flows so as to satisfy users requiring a particular volume of unprocessed petroleum. By means of the studies performed here, a number of conclusions may be drawn: 1. Available algorithms make it possible to compute the detailed network-wide indicators for petroleum transportation in the annual planning model; determine the capacities needed for individual members of the network; and create the necessary list of output documents for compliation of the tenative plan of production for oil transport; 2. An implementation of the oil transport plan using the specified route method should be based on an heuristic approach (a route is specified by a specialist or the routes of the current year are used), thereby allowing us to obtain the necessary production plans.

  12. Planning for gasification of cellulosic wastes: Issues, feasibility and case study

    International Nuclear Information System (INIS)

    Staniewski, M.E.

    1993-01-01

    Gasification is presented as a concept that can assist municipalities and private companies to reduce the amount of solid waste generated and to utilize the cellulosic fraction of such waste as a biofuel. The technical and economic feasibility of cellulosic waste gasification is examined along with the implications associated with the environmental, social, and regulatory issues within a planning context. Study methods included a literature review, survey research employing nonstructured interviews, and a case study analysis. Opportunities for gasification are focused on regional governments in Ontario. The case study concentrated on the Regional Municipality of Waterloo. Regional governments in Ontario can benefit from utilizing the gasification concept to achieve a substantial reduction in the waste stream in an environmentally sound manner and contribute to solving worldwide problems associated with fossil fuel utilization. However, provincial and public acceptance will affect regional government decisions regarding gasification. Separate legislation should be enacted distinguishing gasification from incineration. In addition, the effectiveness of the environmental approval process must be improved; present procedures consume excess time and resources and act to discourage the involvement of public and private proponents. Public acceptance is likely to be affected by negative experiences associated with solid waste combustion. Nonbiased, reliable information is needed to clarify doubts and stress gasification's potential benefits. 85 refs., 15 figs., 26 tabs

  13. Environmental issues in planning building energy technologies R ampersand D in the United States

    International Nuclear Information System (INIS)

    Farhar, B.C.; Abel, F.H.; Nicholls, A.K.; Millhone, J.P.

    1991-08-01

    The US Department of Energy's Office of Building Technologies (OBT) has begun studies on the relationship and impact of buildings energy use on the environment, particularly with respect to global climate change, acid rain, stratospheric ozone depletion, and indoor air quality. The paper presents an overview of international and US federal activity in global change to set OBT's activities in context. The paper then reviews briefly the contribution of buildings to atmospheric problems through building energy use. OBT's program primarily supports projects with indirect environmental impacts through energy efficiency (e.g., thermally activated heat pumps use natural gas instead of electricity) and the use of renewables in buildings. The paper briefly describes the OBT program and covers an inventory of projects that OBT has funded on environmental/building problems. Analyses have included three kinds of topics: (1) CFC substitutes for refrigeration equipment, (2) incorporating the cost of externalities into utility electricity generation, and (3) indoor air quality. The paper shows how environmental issues are being taken into account in planning the US R ampersand D program in building energy technologies. 27 refs

  14. [Materiality Analysis of Health Plans Based on Stakeholder Engagement and the Issues Included at ISO 26000:2010].

    Science.gov (United States)

    Moyano Santiago, Miguel Angel; Rivera Lirio, Juana María

    2017-01-18

    Health plans of the Spanish autonomous communities can incorporate sustainable development criteria in its development. There have been no analysis or proposals about development and indicators. The goal is to add a contribution to help build better health plans aimed at sustainable development and help to manage economic, social and environmental impacts of health systems criteria. We used a variation of the RAND/UCLA or modified Delphi technique method. The process consisted of a bibliographical and context matters and issues related to health and social responsibility analysis based on ISO 26000: 2010. A survey by deliberately to a selection of 70 expert members of the identified stakeholders was carried out and a discussion group was held to determine the consensus on the issues addressed in the survey sample. The research was conducted in 2015. From the literature review 33 health issues included in ISO 26000:2010 were obtained. 7 survey proved relevant high consensus, 8 relevance and average consensus and 18 with less relevance and high level of dissent. The expert group excluded 4 of the 18 subjects with less consensus. 29 issues included 33 at work, divided into 7 subjects contained in the guide ISO 26000 of social responsibility, were relevant stakeholders regarding possible inclusion in health plans. Considering the direct relationship published by ISO (International Organization for Standardization) among the issues ISO 26000 and the economic, social and environmental indicators in GRI (Global Reporting Initiative) in its G4 version, a panel with monitoring indicators related to relevant issues were elaborated.

  15. Issues - I. Renewable energies and urban planning law - Urban planning law and renewable energies: I love you, neither I

    International Nuclear Information System (INIS)

    Gregory Kalfleche

    2012-01-01

    After having noticed that fossil energies must still be used beside renewable energies, and that renewable energies have some negative impacts on landscape and on the environment, the author highlights the fact that the French urban planning law gives a strong support to small renewable energy production units. In a second part, he shows that despite a commitment for the development of renewable energies, urban planning law mostly remains a constraint as far as the development of large units is concerned

  16. State and Urban Area Homeland Security Plans and Exercises: Issues for the 110th Congress

    National Research Council Canada - National Science Library

    Reese, Shawn

    2007-01-01

    ... for both terrorist attacks and natural disasters. Two potential activities that Congress might choose to focus on are the certification of state and urban area homeland security plans and the conduct of exercises to test the plans...

  17. State and Urban Area Homeland Security Plans and Exercises: Issues for the 109th Congress

    National Research Council Canada - National Science Library

    Reese, Shawn

    2006-01-01

    ... for both terrorist attacks and natural disasters. Two potential activities that Congress might choose to focus on are the certification of state and urban area homeland security plans, and the conduct of exercises to test the plans...

  18. Institutional interventions in complex urban systems: Coping with boundary issues in urban planning projects

    NARCIS (Netherlands)

    S. Verweij (Stefan); I.F. van Meerkerk (Ingmar); J.F.M. Koppenjan (Joop); H. Geerlings (Harry)

    2014-01-01

    markdownabstract__Abstract__ Urban planning projects are planned and organized through arrangements between actors. These arrangements are institutional interventions: they intervene in the institutional landscape as existing organizational boundaries are (temporarily) redrawn. Such boundary

  19. Issues on safe radioactive waste management at ChNPP site in International Shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Kilochytska, T.; Gromyko, S.; Kadkin, Y.; Kondratiev, S.; Pavlenko, A.; Bogorinski, P.

    2003-01-01

    The International Shelter Implementation Plan (SIP) [1], is aimed to convert the ChNPP unit 4, destroyed by a beyond-design accident in 1986, into an environmentally safe facility by means of large-scale projects such as stabilization of the existing Sarcophagus (Shelter), construction of a New Safe Confinement (NSC), and installation of engineering and monitoring systems. This report presents some important safety issues concerning radioactive waste (RAW) management at the Shelter. One of the main problems of RAW management is to dispose of large volumes of RAW generated during ground preparation work. It is necessary that RAW be sorted carefully to separate low-active radioactive waste (LLW), which will be the majority, from high-level waste. Considering the fact that the Shelter is in the exclusion zone, the interim storage of LLW in this zone is possible, but a set of safety measures is required, e.g. prevention of dust generation or spreading of radioactivity with water. Another problem is high level RAW management. Highly radioactive fragments of the core, including fuel were ejected during the accident and are now buried under the man-made layer around the Shelter. Unanticipated disclosure of such fragments may happen during any ground preparation work as well as during clearing of premises inside the damaged buildings. Therefore, permanent radiation monitoring is required to prevent any intolerable exposure of workers. Unanticipated disclosure of high-active radioactive waste (HLW) could lead to considerable delay of any work. Since it is particularly difficult to remove HLW from those locations, which can not be easily accessed with removal equipment, such waste needs to be confined and properly shielded at in situ. Due to absence of a permanent HLW storage, an interim storage needs to be provided for in the territory of the Sarcophagus. (author)

  20. An audit of local government planning tools for their potential use in addressing community food and nutrition issues.

    Science.gov (United States)

    Good, Elizabeth; Hammond, Melinda; Martin, Caroline; Burns, Catherine; Groos, Anita

    2010-04-01

    This project aimed to identify how local government planning tools could be used to influence physical and policy environments to support healthy eating behaviours in communities. An audit of Queensland's legislative and non-legislative local government planning tools was conducted by a public health nutritionist to assess their potential use in addressing strategies to achieve positive nutrition outcomes. Ten strategies were identified and covered the following themes: improving access to healthy foods and drinks; increasing access to breastfeeding facilities; decreasing fast food outlet density; and unhealthy food advertising. The audit found that all of the 10 strategies to achieve positive nutrition outcomes could be considered through three or more of the planning tools. Based on the findings of this audit, local government planning tools provide opportunities to address food and nutrition issues and contribute toward creating physical and policy environments that support healthy eating behaviours.

  1. Adapting planning and scheduling concepts to an engineering perspective: Key issues and successful techniques

    International Nuclear Information System (INIS)

    Finnegan, J.M.

    1986-01-01

    Traditional approaches to engineering planning are slanted toward the formats and interests of downstream implementation, and do not always consider the form and criticality of the front-end engineering development process. These processes and scopes are less defined and more subjective than most construction and operations tasks, and require flexible scheduling methods. This paper discusses the characteristics and requirement of engineering schedules, presents concepts for approaching planning in this field, and illustrates simple methods for developing and analyzing engineering plans, and evaluating schedule performance. Engineering plans are structured into a schedule hierarchy which delineates appropriate control and responsibilities, and is governed by key evaluation and decision milestones. Schedule risk analysis considers the uncertainty of engineering tasks, and critical resource constraints. Methods to evaluate schedule performance recognize that engineers and managers are responsible for adequate planning and forecasting, and quality decisions, even if they cannot control all factors influencing schedule results

  2. Tribal Waste Journal: What Is an Integrated Waste Management Plan (Issue 7)

    Science.gov (United States)

    Integrated Waste Management Plans (IWMPs) may offer tribes an efficient and cost-effective way to reduce open dumping, effectively manage solid waste, and protect human health and the environment for this generation and the next.

  3. Inclusive values in the planning of Mathematical issues at an early age

    African Journals Online (AJOL)

    South African Journal of Education. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 37, No 2 (2017) >. Log in or Register to get access to full text downloads.

  4. Planning for nuclear magnetic resonance services. Current health issues No. 2

    International Nuclear Information System (INIS)

    1983-01-01

    This document seeks to provide guidance in planning and in reviewing proposals for NMR services in the region, until a quantitative need assessment for those services can be developed. The Food and Drug Administration's determination that the diagnostic capabilities of NMR imaging have proven to provide substantial benefit vs. risk to patients proven by scientifically valid studies conducted by sponsors of investigational equipment at hospital sites, is pending. When the costs and benefits are clarified, then standards and criteria and a need assessment method, both on the institutional and regional levels, will be developed as an amendment to the Health Systems Plan

  5. [Ethical issues in a market dispute between clinical laboratories and a health plan: case report].

    Science.gov (United States)

    Pinheiro, Malone Santos; de Brito, Ana Maria Guedes; Jeraldo, Verônica de Lourdes Sierpe; Pinheiro, Kariny Souza

    2011-01-01

    In Brazil the private health plans appear as an alternative to the public health assistance. This segment suffered great intensification in the seventies and eighties, culminating in the entry of large insurance company in the scenario of supplementary medicine. Quickly, the service providers associated with these insurance companies, consolidating them in the market and triggering a relationship of dependency. This article analyzed, in the form of a case report, a marketing dispute between clinical laboratories and a health plan, emphasizing the moral and ethical aspects involved in this episode.

  6. Choosing Pre-conception Planning for Women/Families: Counselling and Informed Consent (Part 2) - Pre-conception Reproductive Planning, Lifestyle, Immunization, and Psychosocial Issues.

    Science.gov (United States)

    Wilson, R Douglas

    2017-12-06

    To inform reproductive and other health care providers about pre-conception evaluation, including considerations for reproductive planning, lifestyle modification, immunization status and attitudes, and psychosocial issues. This counselling information can be used for patient education and planning and possible pre-conception and/or prenatal testing. This information may allow for improved risk assessment when pre-conception counselling for individual patients and their families is used. CONSIDERATIONS FOR PRE-CONCEPTION CARE (PART 2) REGARDING PRE-CONCEPTION REPRODUCTIVE PLANNING, LIFESTYLE, IMMUNIZATIONS, AND PSYCHOSOCIAL ISSUES: CONSIDERATION FOR CARE STATEMENTS: For this review article, the Consideration for Care Statements use the Grading of Recommendations, Assessment, Development and Evaluations strength and quality principles because they are comparable for the clinician and the patient/public user. For example, "Strong" for clinicians is defined as "the recommendation would apply to most individuals. Formal discussion aids are not likely to be needed to help individuals make decisions consistent with their values and preferences." For patients/the public, "Strong" is defined as, "we believe most people in this situation would want the recommended course of actions and only a small number would not." Quality of evidence (High, Moderate, Low) is based on the confidence that the true effect lies close to that of the estimate of the effect. In addition, the Canadian Task Force on Preventive Health Care key to evidence statements and grading of recommendations are included. PubMed, Medline, and the Cochrane Database were searched until May 2017, using appropriate key words (i.e., preconception, reproductive planning, lifestyle modification, immunization risks and benefits, psychosocial pregnancy factors/issues). Grey (unpublished) literature was identified through searching websites of health technology assessment and health technology assessment

  7. NRC program for the resolution of generic issues related to nuclear power plants. (Includes plans for the resolution of ''unresolved safety issues'' pursuant to Section 210 of the Energy Reorganization Act of 1974, as amended)

    International Nuclear Information System (INIS)

    1977-12-01

    This report provides a description of the Nuclear Regulatory Commission's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. The NRC program is of considerably broader scope than the ''Unresolved Safety Issues Plan'' required by Section 210. The NRC program does include plans for the resolution of ''Unresolved Safety Issues''; however, in addition, it includes generic tasks for the resolution of environmental issues, for the development of improvements in the reactor licensing process and for consideration of less conservative design criteria or operating limitations in areas where over conservatisms may be unnecessarily restrictive or costly

  8. Planning and urbanistic projects – the non-author approach and issues of synergy in cooperation

    Directory of Open Access Journals (Sweden)

    Liljana Jankovič Grobelšek

    2005-01-01

    Full Text Available The article presents the non-author approach to urbanistic and planning projects. The project leader guides the entire project team, yet particular coordinators are also important. Contrary to authorship in architectural projects, in physical planning authorship is often or even always completely shared. Not only because planning projects can change significantly during adoption procedures, but mainly because there are many participating actors (designers, planners, commissioners and/or investors etc. that are involved in any project’s undertaking. Experience proves that the non-author approach is beneficial for good project management and creation of conditions for constructive cooperation within an interdisciplinary working group and with all the other contributing parties. Two tested examples are presented. Their comparison is very interesting, since the first example shows a project where good cooperation between the client, investor and designers, as well as willing interested public, conditioned quality improvements, while the second (because of the public and consequently against its interests diminished its quality significantly. Our judgement is that the quantity of the often mentioned necessity of public involvement is actually sufficient. There are no obstacles for public participation in urbanistic and physical planning, as long as the public is interested. Troubles are often triggered elsewhere – how to safeguard the common, public interest before particular publics (e.g. neighbours, the immediately affected etc..

  9. Identifying critical issues in recreation planning and management: improving the management-research partnership

    Science.gov (United States)

    John H. Schomaker; David W. Lime

    1988-01-01

    The "nominal group" process is a proven technique to systematically arrive at a consensus about critical information needs in recreation planning and management. Using this process, 41 managers who attended a 1983 conference on river management identified 114 specific information needs grouped under 11 general questions. Clearly, some concerns of...

  10. Social and environmental issues in developing vegetation and fire management plans

    Science.gov (United States)

    Leonard Charles

    1995-01-01

    To reduce the risk of wildfire in the California urban interface often requires actions that will be viewed by members of the public as having adverse effects on such resources as wildlife, vegetation, views, air quality, and recreational opportunities. These citizens can substantially delay and even thwart development of fire management plans. In developing such a...

  11. Issues in Strategic Planning for Vocational Education: Lessons from Algeria, Egypt, and Morocco.

    Science.gov (United States)

    Salmi, Jamil

    1991-01-01

    Although Algeria, Egypt, and Morocco have followed substantially different development strategies, they exhibit similar signs of crisis in vocational education. An integrated approach to planning that acknowledges social, financial, technological, and economic constraints could help coordinate general and vocational education and specialized…

  12. Fuels planning: science synthesis and integration; social issues fact sheet 14: Landscape preference in forested ecosystems

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    It is important to understand what types of landscape settings most people prefer to be able to plan fuels treatment and other forest management activities that will be acceptable to the general public. This fact sheet considers the four common elements of visually preferred forest settings: large trees; herbacious, smooth groundcover; open midstory canopy; and vistas...

  13. Fuels planning: science synthesis and integration; social issues fact sheet 15: Landscape change and aesthetics

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    Fuels management produces changes in the landscape that can impact scenic beauty. If people do not consider a forest to be scenic, they may think that the low scenic quality is a result of poor management or ecological health. This fact sheet looks at the relevency of the effects of natural and human-caused landscape changes, when planning fuels management.

  14. The 21st Century's Vision of the Korean Teaching Profession: Issues and Policy Plans.

    Science.gov (United States)

    Kim, Young Hwa

    2000-01-01

    Presents an overview of the current situation within the Korean teaching profession, highlighting major issues and problems (e.g., low professionalism; ineffective preservice and inservice teacher education; rigid, bureaucratic personnel management; legalization of the Teacher Union; and poor working conditions) and introducing the Ministry of…

  15. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    Science.gov (United States)

    2013-11-08

    Issues for Congress Congressional Research Service 32 availabilit [ies], so that’s 34 [canceled surface ship maintenance availabilities]. We’ll cancel...to carry out the missions we may face in the future… we will need numbers, speed, and the ability to operate in shallow waters .” So as the Air-Sea

  16. Program plan for evaluation of the Ferrocyanide Waste Tank safety issue at the Hanford Site

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-03-01

    This document describes the background, priorities, strategy and logic, and task descriptions for the Ferrocyanide Waste Tank Safety Program. The Ferrocyanide Safety Program was established in 1990 to provide resolution of a major safety issue identified for 24 high-level radioactive waste tanks at the Hanford Site

  17. Sustainable materials: issues in implementing resource efficiency – A UK policy & planning perspective

    OpenAIRE

    Odeleye, Dellé; Menzies, Brian

    2010-01-01

    Increasing the recovery of construction and demolition wastes, and the use of sustainable materials in construction is dependent on a range of drivers that influence design and project planning decisions, as well as mainstream practice on construction sites. In the absence of sustainable materials standards in UK Building Regulations, behaviour is influenced by a combination of sustainability assessment ratings (e.g. BREEAM and the Code for Sutainable Homes), waste regulations, landfill taxes...

  18. A review of health, planning, insurance and property value issues related to active solar heating systems

    International Nuclear Information System (INIS)

    Sadler, R.; Spencer, L.; Digby, G.; Battye, L.

    1996-01-01

    The research reported here considers the potential health risks, local authority planning implications, insurance and property value aspects of solar water heating systems. The United Kingdom market for this technology is also discussed. Methodologies employed, including literature reviews, telephone and postal survey and re-analysis of a 1995 survey, are explained. No major problems are identified in any of the target areas although recommendations for water temperature management and coordinated local authority policies on renewable energy are given. (UK)

  19. Preservice special education teachers' understandings, enactments, views, and plans for scientific inquiry: Issues and hopes

    Science.gov (United States)

    Ghosh, Rajlakshmi

    This study examined the understandings, enactments, views, and plans for scientific inquiry held by preservice special education teachers enrolled in a K--8 general science methods course. Sixteen participants from four special education concentration areas---Mild to Moderate Educational Needs, Moderate to Intense Educational Needs, Mild to Moderate Educational Needs with Language Arts and Reading Emphasis, and Early Childhood Intervention---participated in this study. Qualitative data were collected from questionnaires, interviews, teaching videos, lesson plans, planning commentaries, and reflection papers. Data were analyzed using a grounded theory approach (Strauss & Corbin, 1990) and compared against the theoretical view of inquiry as conceptualized by the National Research Council (NRC, 2000). The participants held unique interpretations of inquiry that only partially matched with the theoretical insights provided by the NRC. The participants' previous science learning experiences and experiences in special education played an important role in shaping their conceptualizations of inquiry as learned in the science methods class. The impacts of such unique interpretations are discussed with reference to both science education and special education, and implications for teacher education are provided.

  20. Planning exercise for the resolution of high level waste tank safety issues

    International Nuclear Information System (INIS)

    Bunting, J.; Saveland, J.

    1992-01-01

    Several conditions have been found to exist within high level radioactive waste storage tanks at the Hanford site which could lead to uncontrolled exothermic reactions and/or to the release of tank contents into the environment. These conditions have led to the establishment of four priority 1 safety issues for the Hanford tanks. Resolution of these safety issues will require the coordinated efforts of professionals in chemical, nuclear, operations, safety, and other technical areas. A coordinated and integrated approach is necessary in order to achieve resolution in the shortest possible time, while ensuring that the steps taken do not complicate the later jobs of vitrification and ultimate disposal. This paper describes the purpose, process, and results of an effort to develop a suggested approach. (author)

  1. 2015 Plan. Project 7: the environmental issue and the electrical sector. Transmission systems

    International Nuclear Information System (INIS)

    1992-10-01

    The main impacts in socio-environmental analysis of transmission lines and substations for expansion of the Brazilian electrical sector are described, showing the actions of social compensation aiming a better insertion of the transmission lines and the substations. The issues relating with the natural and native reserves, the supply to the large consumer centers and the socio-environmental licensing of transmission enterprises are also discussed. (C.G.C.)

  2. [The family planning law should be issued as soon as possible].

    Science.gov (United States)

    Lu, Y

    1989-07-01

    China is facing a baby boom in the next ten years. Now is a perfect time to formulate legislature on family planning (FP) to strengthen the current policy and regulations in order to slow the momentum of excessive population growth. As a result of current economic reform and implementation of the rural household responsibility system, the migrant population has increased tremendously. The fact that millions of rural farmers are shifting to non-agricultural areas created new challenges to the effectiveness of traditional measures of the FP program. Promulgating laws and legislature will facilitate the job of FP. The law should stress the restriction of population growth and encouraging one child per couple. In the rural area it is not feasible to implement the one child policy indiscriminately. Under the policy of one child for a majority of the couples, no third birth is permitted. Local governments should be given the authorization to grant permission for second births for special cases within the birth planning quota. Allowing people living in poor and less developed areas to have more children and granting mothers of handicapped children permission to have an additional child were in fact facilitating the deterioration of the quality of the population. Some current policy in rural income distribution and social welfare was beneficial to large-sized family. Such policies should be changed to give incentives to small-sized families.

  3. Health and environmental effects of the national energy plan: a critical review of some selected issues

    International Nuclear Information System (INIS)

    Morris, S.C.; Fischer, H.; Calef, C.; Crowther, M.A.; Finch, S.J.; Hamilton, L.D.; Moskowitz, P.D.; Nagy, J.; Rowe, M.D.; Sevian, W.A.; Thode, H.C.

    1980-09-01

    This is the first Health and Environmental Effects Document (HEED) on the National Energy Plan (NEP). As such, it can provide: (a) an overview of the health and environmental effects that may be expected from current US energy planning; (b) quantitative approaches to the analysis of these impacts, in the form of dose-response functions and example applications in context; (c) a framework for individual technology-based HEEDs; and (d) a background against which emerging technologies may be measured. Thus, this first NEP-HEED deals in depth with general and continuing thrusts of the NEP process: increased use of coal, continued reliance on nuclear, and eventual increased application of renewable technologies. Special attention is directed to the public health aspects of air pollution from coal, including an overview of recent health studies on effects of particles, sulfur dioxide, hydrocarbons, and radionuclides. Environmental topics including acid rain, the carbon dioxide problem, crop damage, coal mining, and solid waste disposal are also discussed. Nuclear safety and mill tailings are analyzed. Finally, a general assessment of the health effects of renewable technologies is given

  4. Socioeconomic issues for the Bear River Watershed Conservation Land Area Protection Plan

    Science.gov (United States)

    Thomas, Catherine Cullinane; Huber, Christopher; Gascoigne, William; Koontz, Lynne

    2012-01-01

    The Bear River Watershed Conservation Area is located in the Bear River Watershed, a vast basin covering fourteen counties across three states. Located in Wyoming, Utah, and Idaho, the watershed spans roughly 7,500 squares miles: 1,500 squares miles in Wyoming; 2,700 squares miles in Idaho; and 3,300 squares miles in Utah (Utah Division of Water Resources, 2004). Three National Wildlife Refuges are currently contained within the boundary of the BRWCA: the Bear River Migratory Bird Refuge in Utah, the Bear Lake National Wildlife Refuge in Idaho, and the Cokeville Meadows National Wildlife Refuge in Wyoming. In 2010, the U.S. Fish and Wildlife Service conducted a Preliminary Project Proposal and identified the Bear River Watershed Conservation Area as having high-value wildlife habitat. This finding initiated the Land Protection Planning process, which is used by the U.S. Fish and Wildlife Service to study land conservation opportunities including adding lands to the National Wildlife Refuge System. The U.S. Fish and Wildlife Service proposes to include part of the Bear River Watershed Conservation Area in the Refuge System by acquiring up to 920,000 acres of conservation easements from willing landowners to maintain landscape integrity and habitat connectivity in the region. The analysis described in this report provides a profile of the social and economic conditions in the Bear River Watershed Conservation Area and addresses social and economic questions and concerns raised during public involvement in the Land Protection Planning process.

  5. Key issues in human resource planning for home support workers in Canada.

    Science.gov (United States)

    Keefe, Janice M; Knight, Lucy; Martin-Matthews, Anne; Légaré, Jacques

    2011-01-01

    This paper is a synthesis of research on recruitment and retention challenges for home support workers (HSWs) in Canada. Home support workers (HSWs) provide needed support with personal care and daily activities to older persons living in the community. Literature (peer reviewed, government, and non-government documents) published in the past decade was collected from systematic data base searches between January and September 2009, and yielded over 100 references relevant to home care human resources for older Canadians. Four key human resource issues affecting HSWs were identified: compensation, education and training, quality assurance, and working conditions. To increase the workforce and retain skilled employees, employers can tailor their marketing strategies to specific groups, make improvements in work environment, and learn about what workers value and what attracts them to home support work. Understanding these HR issues for HSWs will improve recruitment and retention strategies for this workforce by helping agencies to target their limited resources. Given the projected increase in demand for these workers, preparations need to begin now and consider long-term strategies involving multiple policy areas, such as health and social care, employment, education, and immigration.

  6. The 13 february action plan and the prospects for the North Korean nuclear issue

    International Nuclear Information System (INIS)

    Narushige, Muchishita

    2007-01-01

    On 13 February, the Third Session of the Fifth Round of the Six-Party Talks ended with the adoption of the 'Action Plan' for the implementation of the September 2005 Joint Statement.2 The Action Plan has two phases - the initial phase and the 'next' phase - but the core of the deal lies in the initial stage in which the parties agreed to exchange the nuclear freeze and the provision of energy. In the initial phase, North Korea will 'shut down and seal' the Yongbyon nuclear facility, including the reprocessing facility, and invite back International Atomic Energy Agency (IAEA) personnel to conduct monitoring and verifications within 60 days. In return, the other parties of the talks will provide emergency energy assistance equivalent to 50,000 tons of heavy fuel oil (HFO) to North Korea. There are other items in the initial stage such as North Korea discussing a list of all its nuclear programs with other parties, and the United States and North Korea starting bilateral talks toward full diplomatic relations. However, these items are rather nominal and symbolic in nature and will not likely produce meaningful results in a short period of time. The second phase is even more open-ended. In the second phase, North Korea will provide a complete declaration of all nuclear programs and disable all existing nuclear facilities. In return, the other parties will provide economic, energy and humanitarian assistance up to the equivalent of 950,000 tons of HFO. However, the timing and the details of the nuclear 'disablement' and the provision of assistance are not specified, making it likely that the parties will disagree over how to interpret the words in the Action Plan. The Action Plan provides that five Working Groups (WG) on different topics will be established in order to discuss the details, but the effectiveness of the WG remains to be seen. The Action Plan, therefore, represents the lowest common denominator for the parties involved. In agreeing to the plan, all

  7. The 13 february action plan and the prospects for the North Korean nuclear issue

    Energy Technology Data Exchange (ETDEWEB)

    Narushige, Muchishita

    2007-07-01

    On 13 February, the Third Session of the Fifth Round of the Six-Party Talks ended with the adoption of the 'Action Plan' for the implementation of the September 2005 Joint Statement.2 The Action Plan has two phases - the initial phase and the 'next' phase - but the core of the deal lies in the initial stage in which the parties agreed to exchange the nuclear freeze and the provision of energy. In the initial phase, North Korea will 'shut down and seal' the Yongbyon nuclear facility, including the reprocessing facility, and invite back International Atomic Energy Agency (IAEA) personnel to conduct monitoring and verifications within 60 days. In return, the other parties of the talks will provide emergency energy assistance equivalent to 50,000 tons of heavy fuel oil (HFO) to North Korea. There are other items in the initial stage such as North Korea discussing a list of all its nuclear programs with other parties, and the United States and North Korea starting bilateral talks toward full diplomatic relations. However, these items are rather nominal and symbolic in nature and will not likely produce meaningful results in a short period of time. The second phase is even more open-ended. In the second phase, North Korea will provide a complete declaration of all nuclear programs and disable all existing nuclear facilities. In return, the other parties will provide economic, energy and humanitarian assistance up to the equivalent of 950,000 tons of HFO. However, the timing and the details of the nuclear 'disablement' and the provision of assistance are not specified, making it likely that the parties will disagree over how to interpret the words in the Action Plan. The Action Plan provides that five Working Groups (WG) on different topics will be established in order to discuss the details, but the effectiveness of the WG remains to be seen. The Action Plan, therefore, represents the lowest common denominator for the parties

  8. Wind power planning and operational benefits and issues in evolving competitive markets

    International Nuclear Information System (INIS)

    Milligan, M.R.

    2000-01-01

    The paper discusses the advantages of wind energy generators for both short periods (hours to days) and for longer periods. The value of wind power in the light of the increasing level of risk that owners of generators will face in the new electricity market is also discussed. It is claimed that only now are we beginning to understand the issues associated with the use of large-scale wind power plants in regulated markets and this is coming about through a combination of both experience and computer modelling. As the electric power market becomes increasingly competitive, it is necessary to adapt our knowledge base to cope with the new market structure and to appreciate the associated risks and how they can be mitigated by, say, good siting. The importance of power transmission from wind power generators is emphasised: only if transmission access is afforded to all technologies will the competition succeed

  9. Urban Planning and Sustainable Development in The 21st Century, Conceptual and Management Issues

    Science.gov (United States)

    Azpeitia Santander, Arturo; Azkarate Garai-Olaun, Agustín

    2016-10-01

    Urban areas in historic cities resemble a living organism that evolves in parallel to social transformation processes, shaping the material substrate that expresses identity and collective memory. In the twenty-first century, exponential population growth, globalization and the information society have resulted in many of these socio-economic processes accelerating, with consequences that we are not yet able to discern in their entirety. In this context, cities need to adapt to the general dynamics of urban development by incorporating the environmental, economic and social aspects of the "sustainability paradigm". With good planning, urban heritage is a key sustainable resource that needs promoting as part of the existing territorial competitiveness in a scenario marked by an increase in rivalry between cities. This requires the development of a conceptual framework that, based on a global, holistic and integrative approach, covers equity and social justice, respect for human rights, the gender perspective, public health and environmental quality, among other aspects. In this sense, the purpose of this paper is to study the concept of landscape applied to urban planning in greater depth, paying special attention to the analysis of the notion of Historic Urban Landscapes from a critical point of view, since the economic pressures arising from the reality of today's globalized world pose a serious threat that hinders their custody and protection, complicating this new comprehensive approach: how to bring this new systemic and transversal concept to the current regulatory framework in order to achieve real legal protection and effective governance models in urban areas? What should be the acceptable limits to ensure that "managing this change" does not result in public spaces being at the service of the interests of financial capitalism? These, along with many other questions, make the work of the professionals in charge of urban conservation more challenging in

  10. Ethical, legal and social issues in the context of the planning stages of the Southern African Human Genome Programme.

    Science.gov (United States)

    de Vries, Jantina; Slabbert, Melodie; Pepper, Michael S

    2012-03-01

    As the focus on the origin of modern man appears to be moving from eastern to southern Africa, it is recognised that indigenous populations in southern Africa may be the most genetically diverse on the planet and hence a valuable resource for human genetic diversity studies. In order to build regional capacity for the generation, analysis and application of genomic data, the Southern African Human Genome Programme was recently launched with the aid of seed funding from the national Department of Science and Technology in South Africa. The purpose of the article is to investigate pertinent ethical, legal and social issues that have emerged during the planning stages of the Southern African Human Genome Programme. A careful consideration of key issues such as public perception of genomic research, issues relating to genetic and genomic discrimination and stigmatisation, informed consent, privacy and data protection, and the concept of genomic sovereignty, is of paramount importance in the early stages of the Programme. This article will also consider the present legal framework governing genomic research in South Africa and will conclude with proposals regarding such a framework for the future.

  11. Integrated resource planning for local gas distribution companies: A critical review of regulatory policy issues

    International Nuclear Information System (INIS)

    Harunuzzaman, M.; Islam, M.

    1994-08-01

    According to the report, public utility commissions (PUCs) are increasingly adopting, or considering the adoption of integrated resource planning (IRP) for local gas distribution companies (LDCs). The Energy Policy Act of 1992 (EPAct) requires PUCs to consider IRP for gas LDCs. This study has two major objectives: (1) to help PUCs develop appropriate regulatory approaches with regard to IRP for gas LDCs; and (2) to help PUCs respond to the EPAct directive. The study finds that it is appropriate for PUCs to pursue energy efficiency within the traditional regulatory framework of minimizing private costs of energy production and delivery; and PUCs should play a limited role in addressing environmental externalities. The study also finds that in promoting energy efficiency, PUCs should pursue policies that are incentive-based, procompetitive, and sensitive to rate impacts. The study evaluates a number of traditional and nontraditional ratemaking mechanisms on the basis of cost minimization, energy efficiency, competitiveness, and other criteria. The mechanisms evaluated include direct recovery of DSM expenses, lost revenue adjustments for DSM options, revenue decoupling mechanisms, sharing of DSM cost savings, performance-based rate of return for DSM, provision of DSM as a separate service, deregulation of DSM service, price caps, and deregulation of the noncore gas market. The study concludes with general recommendations for regulatory approaches and ratemaking mechanisms that PUCs may wish to consider in advancing IRP objectives

  12. Cities, planning and energy: the challenges and issues at stake today

    International Nuclear Information System (INIS)

    Roudil, Nadine

    2017-01-01

    Energy has become an integral part of urban politics to very varying degrees. This introductory paper examines the current structuring of a public policy for energy underway in France. It is emerging in the indications of 'energy governance', with apposite urban projects and coordinated development actions. For a long time, French cities were seen as lagging behind in environmental matters, but they are now showing proof of a hybrid incorporation of energy issues into urban policies. The progression of their relationship with energy is connected to the European experiments at the same time as occurring in the wake of a national incentive for transition. French cities' changing relationship with energy is embodied in three approaches. It is symbolised by local councillors' capacity to move beyond this combined influence and propose original projects; by their tendency to refocus their energy commitments on the social rather than market benefits of these initiatives, and by the opportunity it gives them to guide the ongoing transformation of the professional landscape of fashioning cities, and the knowledge and skills associated with this

  13. The Issue of Social Licence and Energy Utility Planning and Investment

    Directory of Open Access Journals (Sweden)

    Michal C. Moore

    2016-03-01

    Full Text Available The vagaries of the term “social licence” and its broad application by various interest groups who tailor its meaning to their widely differing agendas, have proved frustrating for regulatory institutions as well as the energy industry. This problem was the subject of a symposium held in October 2014 in Calgary, and organized by the University of Calgary’s School of Public Policy, to assess the situation and its effects on the energy industry. The use of the term social license may be traced to a growing distrust of regulators and government; in recent years it has been used as a means to demonstrate that the viewpoints of given stakeholders, such as directly affected landowners, specialinterest groups or even minority groups who may only be remotely affected by projects, are being ignored. This issue is exacerbated by the fact that various stakeholders involved in energy projects often have complicated, overlapping and sometimes inconsistent interests in its outcome; this tension is in turn further compounded by the fact there is no firm legal or regulatory definition of social licence. The consequent lack of definitional allows a term or concept such as social licence to be used without precision and authority in the approval process by interested groups, who may insist on rulings or conditions for proposed energy projects to meet a range of ill-defined and unenforceable standards. The regulatory process has been established to solicit and use the contributions of public participation. This participation role, however, brings with it a requirement and commitment to participate under the rule structure established by the regulatory agency, which also typically specifies the qualifications of those testifying as well as establishing the veracity of submittals and oral testimony. This is a key feature separating the policy debates undertaken by legislatures and regulatory institutions that are mandated to implement and enforce policy

  14. Mine and land ownership in operation planning procedures. On the framing of issues of conflicting civil rights under administrative law

    International Nuclear Information System (INIS)

    Schmidt-Assmann, E.; Schoch, F.

    1994-01-01

    On the framing of issues of conflicting civil rights under administrative law. The available arsenal of legal instruments for solving conflicts between proprietary titles to land surfaces and mines is more extensive and differentiated and, if properly deployed, more effective than one might at first expect. The control mechanisms become effective either immediately through laws or through administrative or private acts and are based on public or on private law. They range from the sphere of mining rights, operation planning law, the law on the prevention of damage to private persons over to the regulations under mining law on the payment of damages. The constitutionality of the mining regulations examined here is beyond dispute. They comply with the constitutional requirement to frame the issue concerned and afford protection while at the same time providing the required measure of openness and flexibility for conforming to the peculiarities of the mining business and permitting the necessary sensitivity of administrative control for managing this multipolar legal relationship. At the statutory level the regulatory purpose of the mining law in force is thus fulfilled. (orig./HSCH) [de

  15. Cancer survivorship: history, quality-of-life issues, and the evolving multidisciplinary approach to implementation of cancer survivorship care plans.

    Science.gov (United States)

    Morgan, Mary Ann

    2009-07-01

    To discuss the history of cancer survivorship, related quality-of-life issues, and cancer survivorship care plans (CSCPs). CINAHL, PubMed, published articles, and Web sites. A cancer survivor is an individual who has been diagnosed with cancer, regardless of when that diagnosis was received, who is still living. Cancer survivorship is complex and involves many aspects of care. Major areas of concern for survivors are recurrence, secondary malignancies, and long-term treatment sequelae that affect quality of life. Four essential components of survivorship care are prevention, surveillance, intervention, and coordination. A CSCP should address the survivor's long-term care, such as type of cancer, treatments received, potential side effects, and recommendations for follow-up. It should include preventive practices, how to maintain health and well-being, information on legal protections regarding employment and health insurance, and psychosocial services in the community. Survivorship care for patients with cancer requires a multidisciplinary effort and team approach. Enhanced knowledge of long-term complications of survivorship is needed for healthcare providers. Further research on evidence-based practice for cancer survivorship care also is necessary. Nurses can review CSCPs with patients, instruct them when to seek treatment, promote recommended surveillance protocols, and encourage behaviors that lead to cancer prevention and promote well-being for cancer survivors.

  16. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    International Nuclear Information System (INIS)

    Bjarnadottir, H.; Hilding-Rydevik, T.

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented. Our perception of

  17. Institutional Issues in the Planning and Implementation of a Program to Dispose of High-Level Radioactive Wastes

    Science.gov (United States)

    1981-02-01

    environment including political and psychosociological variables, (2) implementation (2) H. Igor Ansoff , Roger P. Declerck and Robert L. Hayes, "From...Strategic Planning to Strategic Management" in From Strategic Planning to Strategic Management, edited by H. Igor Ansoff et al., John Wiley & Sons, 1976...Hanagement," in From Strategic Planning to Strategic Nanagement, edited by H. Igor Ansoff et al., Jon.𔃻 Wiley & Sons, 1976, p. 33. -44- is not willing to

  18. Correction of heterogeneities in the issue compositions in the construction plans optimized in radiotherapy using linear programming

    International Nuclear Information System (INIS)

    Viana, Rodrigo Sartorelo S.; Lima, Ernesto A.B.F.; Florentino, Helenice de Oliveira; Fonseca, Paulo Roberto da; Homem, Thiago Pedro Donadon

    2009-01-01

    Linear programming models are widely found in the literature addressing various aspects involved in the creation of optimized planning for radiotherapy. However, most mathematical formulations does not incorporate certain factors that are of extreme importance for the formulation of a real planning like the attenuation of the beam of radiation and heterogeneity in the composition of tissue irradiated. In this context are proposed in this paper some modifications in the formulation of a linear programming problem with the objective of making the simulation closer to the real planning for radiotherapy and thus enable a more reliable and comprehensive planning requirements. (author)

  19. Ademe et Vous. Research Newsletter No. 11, July 2015. Urban planning and climate change: intertwined issues and practices we should reconsider

    International Nuclear Information System (INIS)

    Varet, Anne; Guignard, Stephanie

    2015-07-01

    This Research Newsletter, the first in a series of three dedicated to climate change, focuses on the climate change research undertaken with ADEME's support and its relation to urban management, and the results obtained. Content: - urban planning and climate change: intertwined issues and practices we should reconsider; - significant results: climate change adaptation and urban planning: what sorts of challenges should this obligation meet? - meeting: Jacques Comby, climatologist and president of the university Jean Moulin Lyon III, and Emmanuel Acchiardi, deputy director of Ademe's sustainable cities and regions department

  20. Ecodriver. D2.1: Dissemination and Communication plan_Issue2 (Incl. D2.2: Project Website)

    NARCIS (Netherlands)

    Winder, A.; Coppola, C.

    2014-01-01

    The Dissemination and Communication Plan sets the reference for all planned dissemination activities during the project lifetime. It defines target groups, communication actions, how they will be performed, by whom and when, as well as the project’s identity. This report also incorporates an outline

  1. Environmental Scan: A Summary of Key Issues Facing California Community Colleges Pertinent to the Strategic Planning Process

    Science.gov (United States)

    Research and Planning Group for California Community Colleges (RP Group), 2005

    2005-01-01

    As part of the Statewide Strategic Planning Process for California Community Colleges, the Center for Student Success, the research and evaluation organization of the Research and Planning Group for California Community Colleges (RP/CSS) was asked to develop a series of overview documents that would outline both internal and external trends that…

  2. Synergic and conflicting issues in planning underground use to produce energy in densely populated countries, as Italy

    International Nuclear Information System (INIS)

    Quattrocchi, Fedora; Boschi, Enzo; Spena, Angelo; Buttinelli, Mauro; Cantucci, Barbara; Procesi, Monia

    2013-01-01

    compared different technologies in a unique “Clean Energy Economy” improved document (Paris, November 16–17, 2011), by the contribution of this vision too (see reference). In concert with “energy efficiency” improvement both for plants and buildings, in the frame of the “smart cities” scenarios, and the upstanding use of “energy savings”, the energetic planning on regional scale where these cities are located, are strategic for the year 2050: this planning is strongly depending by the underground availability and typology. Therefore, if both literature and European Policy are going fast to improve the concept of “smart cities” this paper stresses the concept of “smart regions”, more strategic than “smart cities”, passing throughout a discussion on the synergic and conflicting use of underground to produce energy for the “smart regions” as a whole. The paper highlights the research lines which are urgent to plan the soundest energy mix for each region by considering the underground performances case by case: a worldwide mapping, by GIS tools of this kind of information could be strategic for all the “world energy management” authorities, up to ONU, with its Intergovernmental Panel on Climate Change (IPCC), the G20, the Carbon Sequestration Leadership Forum (CSLF) and the European Platforms such as the “Zero Emissions Fossil Fuel Power Plants” (EU-ZEP Platform), the Steel Platform, the Biomass Platform too. All of these organizations agree on the need for synergistic and coexistent uses of underground for geological storage of CO 2 , CH 4 , nuclear waste and geothermic exploitation. The paper is therefore a discussion of the tools, methods and approaches to these underground affecting technologies, after a gross view of the different uses of underground to produce energy for each use, with their main critical issues (i.e. public acceptance in different cases). The paper gives some gross evaluation for the Lazio Region and some hints

  3. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    Energy Technology Data Exchange (ETDEWEB)

    Bjarnadottir, H.; Hilding-Rydevik, T. [Nordregio, Stockholm (Sweden)

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented

  4. Fuels planning: science synthesis and integration; social issues fact sheet 06: Important considerations for communicating about hazards

    Science.gov (United States)

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    Effective public education and communication campaigns about wildland fire and fuels management should have clear objectives, and use the right techniques to achieve these objectives. This fact sheet lists seven important considerations for planning or implementing a hazard communication effort.

  5. Critical human-factors issues in nuclear-power regulation and a recommended comprehensive human-factors long-range plan. Executive summary

    International Nuclear Information System (INIS)

    Hopkins, C.O.; Snyder, H.L.; Price, H.E.; Hornick, R.J.; Mackie, R.R.; Smillie, R.J.; Sugarman, R.C.

    1982-08-01

    This comprehensive long-range human factors plan for nuclear reactor regulation was developed by a Study Group of the Human Factors Society, Inc. This Study Group was selected by the Executive Council of the Society to provide a balanced, experienced human factors perspective to the applications of human factors scientific and engineering knowledge to nuclear power generation. The report is presented in three volumes. Volume 1 contains an Executive Summary of the 18-month effort and its conclusions. Volume 2 summarizes all known nuclear-related human factors activities, evaluates these activities wherever adequate information is available, and describes the recommended long-range (10-year) plan for human factors in regulation. Volume 3 elaborates upon each of the human factors issues and areas of recommended human factors involvement contained in the plan, and discusses the logic that led to the recommendations

  6. An analysis of land use planning and equity issues surrounding hazardous liquid and natural gas transmission pipelines in North Carolina

    Science.gov (United States)

    Osland, Anna Christine

    Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable

  7. Discussion and Reflection on Several Core Issues in the Grand Canal Heritage Conservation Planning Under the Background of Application for World Heritage

    Directory of Open Access Journals (Sweden)

    D. Yao

    2015-08-01

    Full Text Available At the turn of the century, a series of new heritage concepts have appeared in the area of international cultural heritage protection, such as cultural landscape, cultural route, heritage corridor, heritage canal, which presents the development of people’s recognition of cultural heritage. According to The Operational Guidelines for the Implementation of the World Heritage Convention, management planning must be contained in the material used to apply for world heritage. The State Administration of Cultural Heritage designed the mission and work schedule of China’s Grand Canal conservation planning in 2008. This research will introduce the working system of China’s Grand Canal conservation planning on three levels: city, province and nation. It will also summarize the characteristics of the core technologies in China’s Grand Canal conservation planning, including key issues like the identification of the core characteristic of China’s Grand Canal, value assessment and determination of the protection scope. Through reviewing, thinking and analyzing the previous accomplishments, the research will offer some advices for the similar world heritage conservation planning after.

  8. Fuels planning: science synthesis and integration; social issues fact sheet 13: Strategies for managing fuels and visual quality

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    The public's acceptance of forest management practices, including fuels reduction, is heavily based on how forests look. Fuels managers can improve their chances of success by considering aesthetics when making management decisions. This fact sheet reviews a three-part general strategy for managing fuels and visual quality: planning, implementation, and monitoring...

  9. Parent Involvement and Extended Learning Activities in School Improvement Plans in the Midwest Region. Issues & Answers. REL 2011-No. 115

    Science.gov (United States)

    Kochanek, Julie Reed; Wraight, Sara; Wan, Yinmei; Nylen, Leslie; Rodriguez, Sheila

    2011-01-01

    According to the reauthorized Elementary and Secondary Education Act of 2001 (Public Law 107-110), commonly referred to as the No Child Left Behind (NCLB) Act, Title I schools that fail to make adequate yearly progress for two consecutive years are required to develop or revise school improvement plans aimed at boosting student achievement.…

  10. Parent Involvement Activities in School Improvement Plans in the Northwest Region. Issues & Answers. REL 2008-No. 064

    Science.gov (United States)

    Speth, Timothy; Saifer, Steffen; Forehand, Gregory

    2008-01-01

    Although the No Child Left Behind Act of 2001 (NCLB) spells out parent involvement requirements for schools in need of improvement, the majority of the Northwest Region school improvement plans reviewed failed to include such provisions. Reported findings include: (1) Despite a wide range of parent involvement practices discussed in legislation…

  11. Parent Involvement Activities in School Improvement Plans in the Northwest Region. Summary. Issues & Answers. REL 2008-No. 064

    Science.gov (United States)

    Speth, Timothy; Saifer, Steffen; Forehand, Gregory

    2008-01-01

    This document presents a summary of the larger report, "Parent Involvement Activities in School Improvement Plans in the Northwest Region." Although the No Child Left Behind Act of 2001 (NCLB) spells out parent involvement requirements for schools in need of improvement, the majority of the Northwest Region school improvement plans…

  12. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States); Hill, L.J. [Oak Ridge National Lab., TN (United States)

    1995-11-01

    This document contains summaries of the electric utilities performance-based rate plans for the following companies: Alabama Power Company; Central Maine Power Company; Consolidated Edison of New York; Mississippi Power Company; New York State Electric and Gas Corporation; Niagara Mohawk Power Corporation; PacifiCorp; Pacific Gas and Electric; Southern California Edison; San Diego Gas & Electric; and Tucson Electric Power. In addition, this document also contains information about LBNL`s Power Index and Incentive Properties of a Hybrid Cap and Long-Run Demand Elasticity.

  13. A study for the domestic application plan of the Generic Safety Issue(GSI) for the Pressurized Heavy Water Reactor

    International Nuclear Information System (INIS)

    Lee, Un Chul; Jang, Jin Wook; Lee, Sang Kyung; Lee, Doo Yong; Park, Chang Hwan

    2002-03-01

    In this study, a base work to construct the database of the domestic and foreign GSls were done through performing the deviation of GSls for the PHWR by investigating the development trend of international joint studies and the GSls of 4 countries as the PHWR state and examined the IAEA acceptance of GSls classification for the GSls of Canada, Korea Republic of, Argentina and India. We evaluated the possibility of application of the safety Issue for PHWR by investigating causes, contents and follow-up measures of each items. To evaluate the domestic application validity of the safety issue, We made the investigation matrix for the safety issue of each countries and also are reflecting new results in investigation matrix by examining IAEA PHWR GSI development trend. We intended to derive the GSls which are most appropriate in our PHWR by examining every issues. the derived GSls are divided into the design parts and the operation parts. And they have to be solved as soon as possible

  14. A study for the domestic application plan of the Generic Safety Issue(GSI) for the Pressurized Heavy Water Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Un Chul; Jang, Jin Wook; Lee, Sang Kyung; Lee, Doo Yong; Park, Chang Hwan [Seoul National Univ., Seoul (Korea, Republic of)

    2002-03-15

    In this study, a base work to construct the database of the domestic and foreign GSls were done through performing the deviation of GSls for the PHWR by investigating the development trend of international joint studies and the GSls of 4 countries as the PHWR state and examined the IAEA acceptance of GSls classification for the GSls of Canada, Korea Republic of, Argentina and India. We evaluated the possibility of application of the safety Issue for PHWR by investigating causes, contents and follow-up measures of each items. To evaluate the domestic application validity of the safety issue, We made the investigation matrix for the safety issue of each countries and also are reflecting new results in investigation matrix by examining IAEA PHWR GSI development trend. We intended to derive the GSls which are most appropriate in our PHWR by examining every issues. the derived GSls are divided into the design parts and the operation parts. And they have to be solved as soon as possible.

  15. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.; Hill, L.J. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.]|[Oak Ridge National Lab., TN (United States). Energy Div.

    1995-11-01

    Performance-Based Ratemaking (PBR) is a form of utility regulation that strengthens the financial incentives to lower rates, lower costs, or improve nonprice performance relative traditional regulation, which the authors call cost-of-service, rate-of-return (COS/ROR) regulation. Although the electric utility industry has considerable experience with incentive mechanisms that target specific areas of performance, implementation of mechanisms that cover a comprehensive set of utility costs or services is relatively rare. In recent years, interest in PBR has increased as a result of growing dissatisfaction with COS/ROR and as a result of economic and technological trends that are leading to more competition in certain segments of the electricity industry. In addition, incentive regulation has been used with some success in other public utility industries, most notably telecommunications in the US and telecommunications, energy, and water in the United Kingdom. In this report, the authors analyze comprehensive PBR mechanisms for electric utilities in four ways: (1) they describe different types of PBR mechanisms, (2) they review a sample of actual PBR plans, (3) they consider the interaction of PBR and utility-funded energy efficiency programs, and (4) they examine how PBR interacts with electric utility resource planning and industry restructuring. The report should be of interest to technical staff of utilities and regulatory commissions that are actively considering or designing PBR mechanisms. 16 figs., 17 tabs.

  16. Research strategies and programs related to the National Plan of Management of Radioactive Materials and Wastes. Issue 2008

    International Nuclear Information System (INIS)

    2008-01-01

    After having recalled the legal context defining the requirements of the PNGMDR (Plan national de gestion des matieres et dechets radioactifs, national plan of management of radioactive materials and wastes), this report presents several research programs which address various domains: waste packaging and behaviour (decontamination, waste characterization, waste processing, the storage sizing inventory model, parcel behaviour, used fuel evolution, future wastes), warehousing and storage in deep geological formation (characterization of the Meuse/Haute-Marne site, scientific program, simulation programs, measurement means for storage monitoring, knowledge base, security and reversibility options for storage design, security studies, warehousing options), storage of radiferous and graphite wastes, investigation of separation/transmutation scenarios, investigations related to separation, investigations related to fuel fabrication, investigations related to the transmutation of minor actinides, researches in social and human sciences

  17. An analysis of operational experience during low power and shutdown and a plan for addressing human reliability assessment issues

    International Nuclear Information System (INIS)

    Barriere, M.; Luckas, W.; Whitehead, D.; Ramey-Smith, A.

    1994-06-01

    Recent nuclear power plant events (e.g. Chernobyl, Diablo Canyon, and Vogtle) and US Nuclear Regulatory Commission (NRC) reports (e.g. NUREG-1449) have led to concerns regarding human reliability during low power and shutdown (LP ampersand S) conditions and limitations of human reliability analysis (HRA) methodologies in adequately representing the LP ampersand S environment. As a result of these concerns, the NRC initiated two parallel research projects to assess the influence of LP ampersand S conditions on human reliability through an analysis of operational experience at pressurized water reactors (PWRs) an boiling water reactors (BWRs). These research projects, performed by Brookhaven National Laboratory for PWRS, and Sandia National Laboratories for BWRs, identified unique aspects of human performance during LP ampersand S conditions and provided a program plan for research and development necessary to improve existing HRA methodologies. This report documents the results of the analysis of LP ampersand S operating experience and describes the improved HRA program plan

  18. Planning, organizational and management issues in moving from operation to decommissioning and their impact on waste management

    International Nuclear Information System (INIS)

    Laraia, M.

    2001-01-01

    The transition from a nuclear facility's operating phase to decommissioning is critical. A number of modifications are required during this period to adapt the facility to new objectives and requirements. There are various activities to prepare for implementation of the decommissioning strategy that may be started before final plant closure or immediately afterwards: these serve to support the decommissioning planning process and ease the burden of operating requirements. (Author)

  19. Report of the AAPM Task Group No. 105: Issues associated with clinical implementation of Monte Carlo-based photon and electron external beam treatment planning

    International Nuclear Information System (INIS)

    Chetty, Indrin J.; Curran, Bruce; Cygler, Joanna E.; DeMarco, John J.; Ezzell, Gary; Faddegon, Bruce A.; Kawrakow, Iwan; Keall, Paul J.; Liu, Helen; Ma, C.-M. Charlie; Rogers, D. W. O.; Seuntjens, Jan; Sheikh-Bagheri, Daryoush; Siebers, Jeffrey V.

    2007-01-01

    The Monte Carlo (MC) method has been shown through many research studies to calculate accurate dose distributions for clinical radiotherapy, particularly in heterogeneous patient tissues where the effects of electron transport cannot be accurately handled with conventional, deterministic dose algorithms. Despite its proven accuracy and the potential for improved dose distributions to influence treatment outcomes, the long calculation times previously associated with MC simulation rendered this method impractical for routine clinical treatment planning. However, the development of faster codes optimized for radiotherapy calculations and improvements in computer processor technology have substantially reduced calculation times to, in some instances, within minutes on a single processor. These advances have motivated several major treatment planning system vendors to embark upon the path of MC techniques. Several commercial vendors have already released or are currently in the process of releasing MC algorithms for photon and/or electron beam treatment planning. Consequently, the accessibility and use of MC treatment planning algorithms may well become widespread in the radiotherapy community. With MC simulation, dose is computed stochastically using first principles; this method is therefore quite different from conventional dose algorithms. Issues such as statistical uncertainties, the use of variance reduction techniques, the ability to account for geometric details in the accelerator treatment head simulation, and other features, are all unique components of a MC treatment planning algorithm. Successful implementation by the clinical physicist of such a system will require an understanding of the basic principles of MC techniques. The purpose of this report, while providing education and review on the use of MC simulation in radiotherapy planning, is to set out, for both users and developers, the salient issues associated with clinical implementation and

  20. Resolution of issues with renewable energy penetration in a long-range power system demand-supply planning

    International Nuclear Information System (INIS)

    Ogimoto, Kazuhiko; Ikeda, Yuichi; Kataoka, Kazuto; Ikegami, Takashi; Nonaka, Shunsuke; Azuma, Hitoshi

    2012-01-01

    Under the anticipated high penetration of variable renewable energy generation such as photovoltaic, the issue of supply demand balance should be evaluated and fixed. Technologies such as demand activation, and energy storage are expected to solve the issue. Under the situation, a long-range power system supply demand analysis should have the capability for the evaluation in its analysis steps of demand preparation, maintenance scheduling, and economic dispatch analysis. This paper presents results of a parametric analysis of the reduction of PV and Wind generation curtailment reduction by deployment of batteries. Based on a set of scenarios of the prospects of Japan's 10 power system demand-supply condition in 2030, the demand-supply balance capability are analyzed assuming PV and wind generation variation, demand activation and dispatchable batteries. (author)

  1. Strategic Management for Organizational Effectiveness. The Effect of Human Resource Planning on Retention and Related Issues. Volume 3.

    Science.gov (United States)

    1984-12-01

    external impact than individuals in the other organizations. Also, private signals resulted in higher likelihoods of leaving for this externally aware...negative consequences S for boundary spanners; i.e., those Navy personnel who deal largely with individuals in the civilian sector , such as recruiters...of worklife through more effective communications, group and leadership dynamics, etc. -47- S• S The issues of values and organizational culture are

  2. Towards gender-sensitivity: the Philippine POPCOM experience. How sensitive to gender issues are our family planning personnel?

    Science.gov (United States)

    Danguilan, M

    1995-04-01

    The Philippine Commission on Population (POPCOM) sets and coordinates the country's population policy. POPCOM launched Gender I in early 1994 in the attempt to find out how aware and sensitive its board of commissioners, staff, and the provincial and city population officers were on gender and population issues. The assessment covered the respondents' gender relations at the workplace; gender, work, and family responsibilities; job satisfaction; their perceptions about gender-related issues in reproductive health; personal sex attitudes; and general perceptions on gender issues. The project also explored respondents' knowledge and perceptions on population growth and structure; population information generation and use; quality of life; reproductive health; law, ethics, and policy; and men's and women's roles. Having completed the institutional assessment, POPCOM has now implemented the Gender II project designed to strengthen the formulation, coordination, and implementation of gender-aware population and reproductive health policies and programs. Project activities include policy review and framework development, capability building through gender and reproductive health training and information management, and special research projects.

  3. Sustainable Development Plan for Korea through Expansion of Green IT: Policy Issues for the Effective Utilization of Big Data

    Directory of Open Access Journals (Sweden)

    Hyun Baek

    2015-01-01

    Full Text Available The South Korean government is providing full support for green IT as one of the growth engines of Korea. The purpose of this study is to derive policy issues needed for the sustainable development of Korea through utilizing Big Data by applying green IT. The analysis is done using a Delphi technique. Results show that the establishment of computing platforms that can easily share data and generate value is prioritized for the effective use of Big Data from the environment. In addition, the government-led publication of genetic information and electronic medical records for research purposes has been derived as an important policy issue for the use of bio-Big Data. Besides, a guideline concerning the standardization of machine to machine and Internet of Things communication and data security is needed to effectively use Big Data from machines/things. Moreover, a review of legislation related to the utilization of Big Data from digital media has been derived as an important policy issue. The results of this study propose the direction in which the Korean government should move for green growth through effective utilization of Big Data. The results can be also useful resources for establishing relevant policies for various countries that are accelerating sustainable development.

  4. Using Community-Based Participatory Research to Identify Environmental Justice Issues in an Inner-City Community and Inform Urban Planning.

    Science.gov (United States)

    Mansyur, Carol Leler; Jeng, Hueiwang Anna; Holloman, Erica; DeBrew, Linwood

    2016-01-01

    The Southeast CARE Coalition has been using community-based participatory research to examine environmental degradation in the Southeast Community, Newport News, Virginia. A survey was developed to collect assessment data. Up to 66% of respondents were concerned about environmental problems in their community. Those with health conditions were significantly more likely to identify specific environmental problems. The top 5 environmental concerns included coal dust, air quality, crime, water quality, and trash. The community-based participatory research process is building community capacity and participation, providing community input into strategic planning, and empowering community members to take control of environmental justice issues in their community.

  5. Planning of renewables schemes: Deliberative and fair decision-making on landscape issues instead of reproachful accusations of non-cooperation

    International Nuclear Information System (INIS)

    Wolsink, Maarten

    2007-01-01

    The main issues related to successful implementation policies concern the socio-economic institutions that are conditional to planning in the energy policy domain, but also in the domain of spatial planning. Successful investments and the siting of renewable power plants eventually determine the success rate of national efforts in establishing renewable capacity. Central planning usually has several objectives and these often have a detrimental effect on the goal of renewable energy application. Current problems related to implementation decisions concerning wind power schemes are an example to those who will be faced by other renewable power plants, notably biomass. Regarding community acceptance of wind power schemes, the visual evaluation of the impact of wind power on the values of the landscape is by far the most dominant factor in explaining opposition or support. Type of landscape fully overshadows other attitudinal attributes, as well as other visual and scenic factors such as the design of wind turbines and wind farms, and the number and the size of turbines. Planning regimes and decision-making practices that really enhance the implementation processes of renewable energy require 'strong' ecological modernization. This means institutional changes that create involvement and trust of actors at the actual implementation level. Local opposition cannot be explained by the egotistical motives of local residents. When the inclination to behave according to (supposed) backyard motives is investigated, the scale to measure this phenomenon appears to indicate commitment to equity issues and fairness of decision-making. Hence, for wind power, local involvement to represent the local values of site-specific landscapes is crucial. For other renewables the source-specific features are different, but conflicts can be expected as well because the fairness of implementation decisions will be equally significant

  6. Issues in the Planning and Design of a Bilingual (English–Northern Sotho Explanatory Dictionary for Industrial Electronics

    Directory of Open Access Journals (Sweden)

    Elsabé Taljard

    2011-10-01

    Full Text Available

    Abstract: The focus of this article is the planning and design of a bilingual, explanatory dictionary for industrial electronics with a clearly delimited and very specific target user in mind. Since the number of lemmas to be treated in the dictionary is limited to 500, special care must be taken to select those lemmas that are relevant for both the purpose of the dictionary and the needs of the target user. It is indicated that the main consideration in the planning of the envisaged dictionary is user-friendliness, as dictated by the intended target users. In this article, a novel approach to the semi-automatic selection of lemmas for inclusion in an LSP dictionary is described. The procedure that is used for the extraction of definitional information from an electronic corpus is also explained.

    Keywords: LSP LEXICOGRAPHY, DICTIONARY PLANNING, LEMMA SELECTION, SEMI-AUTOMATIC TERM EXTRACTION, DEFINITIONAL INFORMATION, INDUSTRIAL ELEC-TRONICS, CORPUS-BASED LEXICOGRAPHY

    Opsomming: Kwessies by die beplanning en ontwerp van 'n tweetalige (Engels–Noord-Sotho verklarende woordeboek vir industriële elektronika. Die fokus van hierdie artikel is die beplanning en ontwerp van 'n tweetalige, verklarende woorde-boek vir industriële elektronika met 'n duidelik afgebakende en baie spesifieke teikengebruiker in gedagte. Aangesien die getal lemmas vir behandeling in die woordeboek tot 500 beperk is, moet besondere sorg gedra word dat daardie lemmas gekies word wat beantwoord aan die doel van die woordeboek én die behoeftes van die teikengebruiker. Daar word uitgewys dat die hoofoorweging in die beplanning van die beoogde woordeboek gebruikersvriendelikheid is, soos bepaal deur die bestemde teikengebruikers. In hierdie artikel word 'n nuwe benadering tot die semi-outomatiese keuse van lemmas vir insluiting in 'n vakwoordeboek beskryf. Die prosedure wat vir die onttrek-king van definisiële inligting uit 'n elektroniese korpus gebruik word

  7. Resolution of the reactor vessel materials toughness safety issue; Task Action Plan A-11; Appendices C-K

    International Nuclear Information System (INIS)

    Johnson, R.E.

    1981-09-01

    The central problem in the Unresolved Safety Issue A-11, 'Reactor Vessel Materials Toughness,' was to provide guidance in performing analyses for reactor pressure vessels (RPVs) which fail to meet the toughness requirements during service life as a result of neutron radiation embrittlement. A technical team of recognized experts was organized to assist the NRC staff in addressing the problem. Using the foundation of the tearing modulus concept, which has been developed under earlier NRC sponsorship, relationships were obtained which provided approximate solutions to the RPV fracture problem with assumed beltline region flaws. Volume I of this report is a brief presentation of the problem and the results; Volume II provides the detailed technical foundations

  8. Evidence from the field: Findings on issues related to planning, implementing and evaluating gender-based programs.

    Science.gov (United States)

    Kowalczyk, Shelly; Randolph, Suzanne; Stokes, Shereitte; Winston, Stefanie

    2015-08-01

    An Initiative of the United States Department of Health and Human Services' Office on Women's Health (OWH), Coalition for a Healthier Community (CHC), supports ten grantees across the U.S. in the implementation of gender-based health interventions targeting women and girls. A national evaluation is assessing whether gender-focused public health systems approaches are sustainable and cost effective in addressing health disparities in women and girls. To inform the evaluation, a systematic examination was conducted of literature in both the public and private sector designed to track, assess, understand, and improve women's health, public health systems approaches, and the cost-effectiveness and sustainability of gender-based programs. A two-person team assured the quality of the results following the review of abstracts and full-text articles. Of 123 articles meeting eligibility criteria (See inclusion criteria described in Section 2.2 below), only 18 met inclusion criteria specific to a focus on a systems approach, cost-effectiveness and/or sustainability. Studies assessing systems approaches suggested their effectiveness in changing perceptions and increasing knowledge within a community; increasing involvement of local decision-makers and other community leaders in women's health issues; and increasing community capacity to address women and girls' health. Further evaluation of the cost-effectiveness and sustainability of gender-based approaches is needed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Nordic nuclear safety research program 1994-1997. Project coordination incl. SAM-4 general information issues. Report 1996. Plans for 1997

    International Nuclear Information System (INIS)

    1997-04-01

    NKS (Nordic Nuclear Safety Research) is a cooperative body in nuclear safety, radiation protection and emergency preparedness. Its purpose is to carry out cost-effective Nordic projects, thus producing research results, exercises, information, recommendations, manuals etc., to be used by decision makers and other concerned staff members at authorities and within the nuclear industry. This is the annual report for 1996, the third year of the fifth four-year NKS program (1994-1997). The report also contains plans for the rest of the program period, including budget proposals. The following major fields of research have been identified: reactor safety; radioactive waste; radioecology; emergency preparedness; and information issues. A total of nine projects are now under way within that framework. One project (RAK-1) is dedicated to reactor safety strategies: how to avoid serious accidents. A parallel project (RAK-2) deals with minimizing releases in case of an accident. When can an overheated reactor core still be water-cooled? What might be the consequences of the cooling? All Nordic countries have long-lived low and medium level radioactive waste that requires final disposal. One project (AFA-1) addresses that issue. Environmental impact of radioactive releases is studied in two radioecology projects. The project on marine radioecology, including sediment research (EKO-1), encompasses sampling, analysis and modeling. These are also key issues in the project on long ecological half-lives in semi-natural systems (EKO-2). The transfer of radioactive cesium and strontium in the chains soil - vegetation - sheep and mushroom - roe deer is studied, along with freshwater systems. Long-term doses to main is the ultimate output from the obtained models. Another aspect of environmental impact is emergency preparedness. A recently started project, EKO-5, addresses the issue of early planning for cleanup operations following a fallout. 'Early' in this context means within the

  10. Regional and local planning implications of energy policy: lessons from the past and issues from the future. [UK; 1967 to 1986

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, P.W.

    1986-01-01

    This paper firstly examines the development of UK energy policy from 1967 to 1986; emphasis is placed upon the changing position of the coal industry, this section concludes with a consideration of the most recent energy forecasts. Following a brief examination of the relationships between energy and the regions, the paper looks in some detail at the changing patterns of coal production and employment in the UK regions. This leads to a consideration of the links between coal mining and the planning system: particular emphasis is placed upon the environmental, social and economic impacts of mining. The paper concludes with an examination of some of the key issues which may confront UK coal and the role of the coal industry in the process of regional development. 82 refs.

  11. Study for Action Plan proposal on some issues of the national nuclear infrastructure for the new research reactor project in phase 1&2

    International Nuclear Information System (INIS)

    Cao Hong Lan; Bui Dang Hanh; Nguyen Nhi Dien

    2017-01-01

    The Project on construction for a new research reactor in Vietnam is under preparation. At the same time, it is necessary to prepare a firm and comprehensive national nuclear infrastructure which is aimed to implement smoothly and ensure safety and security for the project. How is the status of the nuclear infrastructure for research reactor project in Vietnam, how can it be assessed, what is the assessment used for and what are we going to do with that? So, all of these things are the goals set out to address in this Task. However, due to time constraints and conformity with requirement of project progress, this Task assessed only 8 critical issues in infrastructure in phase 1&2, including National position; Management; Legislative framework; Regulatory framework; Human resource development; Radioactive waste; Site survey, site selection and evaluation; and Environmental protection. Conditions and criteria in the documents on milestones and assessment of the national nuclear infrastructure to support a new research reactor project of the International Atomic Energy Agency (IAEA) were used as bases for assessing the Vietnam's infrastructure status. The results of the Task are assessment and identification for gaps which need to be addressed and proposing for a plan on completing the national nuclear infrastructure for the research reactor project on 8 issues in stages 1&2. (author)

  12. Proposed nomination of sites for site characterization and recommendation of issues for environmental assessments and site characterization plans. Technical report. Summary of issues and concerns expressed during the April-May 1983 US Department of Energy public hearings

    International Nuclear Information System (INIS)

    1983-09-01

    As required by Section 112(b)(2) of the Nuclear Waste Policy Act (Public Law 97-425), the US Department of Energy (DOE) conducted a series of nine formal public hearings during April and May 1983 in local communities in the vicinity of seven identified potentially acceptable salt sites and in the state capitals of the States of Louisiana, Mississippi, Texas, and Utah. The public hearings focused on the proposed nomination of the Vacherie Dome site in Louisiana; the Richton and Cypress Creek Salt Dome sites in Mississippi; the Deaf Smith County and Swisher County bedded salt sites in Texas; and the Davis and Lavender Canyon bedded salt sites in Utah. The issues expressed during area public hearings are summarized in this document, which serves as a digest of and as an index to the public hearing records of each of the four salt states. Specifically, almost 1100 paraphrased public hearing comments are identified and grouped into 62 subjects within the following nine general topical areas: NWTS Program Planning Process, Consultation and Cooperation, Engineering/Repository Design, Geology, Hydrology, Transportation, Public Health and Safety, Environmental Quality, and Socioeconomics

  13. Physical validation issue of the NEPTUNE two-phase modelling: validation plan to be adopted, experimental programs to be set up and associated instrumentation techniques developed

    International Nuclear Information System (INIS)

    Pierre Peturaud; Eric Hervieu

    2005-01-01

    Full text of publication follows: A long-term joint development program for the next generation of nuclear reactors simulation tools has been launched in 2001 by EDF (Electricite de France) and CEA (Commissariat a l'Energie Atomique). The NEPTUNE Project constitutes the Thermal-Hydraulics part of this comprehensive program. Along with the underway development of this new two-phase flow software platform, the physical validation of the involved modelling is a crucial issue, whatever the modelling scale is, and the present paper deals with this issue. After a brief recall about the NEPTUNE platform, the general validation strategy to be adopted is first of all clarified by means of three major features: (i) physical validation in close connection with the concerned industrial applications, (ii) involving (as far as possible) a two-step process successively focusing on dominant separate models and assessing the whole modelling capability, (iii) thanks to the use of relevant data with respect to the validation aims. Based on this general validation process, a four-step generic work approach has been defined; it includes: (i) a thorough analysis of the concerned industrial applications to identify the key physical phenomena involved and associated dominant basic models, (ii) an assessment of these models against the available validation pieces of information, to specify the additional validation needs and define dedicated validation plans, (iii) an inventory and assessment of existing validation data (with respect to the requirements specified in the previous task) to identify the actual needs for new validation data, (iv) the specification of the new experimental programs to be set up to provide the needed new data. This work approach has been applied to the NEPTUNE software, focusing on 8 high priority industrial applications, and it has resulted in the definition of (i) the validation plan and experimental programs to be set up for the open medium 3D modelling

  14. Proceedings of the 18. international symposium on mine planning and equipment selection (MPES 2009) and the 11. international symposium on environmental issues and waste management in energy and mineral production (SWEMP 2009) : mine planning and equipment selection and environmental issues and waste management in energy and mineral production

    International Nuclear Information System (INIS)

    Singhal, R.K.; Mehrotra, A.; Fytas, K.; Ge, H.

    2009-01-01

    This conference focused on the application of innovative technologies to the mineral industries and the development of productive methods for the mining and processing industries. It was attended by participants from North and South America, Europe, Australia, Africa and Asia with backgrounds in computer sciences, mining engineering and research in mineral production. The major topics addressed regarding mine planning and equipment selection included economic and technical feasibility studies; reserve estimation; mine development; design and planning of surface and underground mines; drilling, blasting, tunneling and excavation engineering; mining equipment selection; automation and information technology; maintenance and production management for mines and mining systems; mining in terms of health, safety and the environment; and rock mechanics and geotechnical applications. The topics addressed regarding waste management in energy and mineral production included the environmental impacts of coal-fired power projects; mining and reclamation; water management; social aspects of rehabilitation; sustainable development for mineral and energy industries; remediation of contaminated soil and groundwater; health hazard and safety issues in small-scale mining; environmental issues in surface and underground mining of metalliferous, coal, uranium and industrial minerals; occupational health and safety; control of effluents from mineral processing, metallurgy and chemical plants; emerging technologies for environmental protection; reliability of waste containment structures; and tailings treatment, recycling and disposal. The conference featured 162 presentations, of which 30 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  15. Plan well, plan often

    Science.gov (United States)

    Bill Block

    2013-01-01

    This issue includes an invited paper by Courtney Schultz and her colleagues commenting on the application of the newly adopted U.S. Forest Service Planning Rule (hereafter, the rule) for wildlife. The rule is basically implementing language to interpret the spirit and intent of the National Forest Management Act (NFMA) of 1976. Laws such as NFMA require additional...

  16. Succession Planning: Building a Successful Organization in a Dynamic Environment. Report from the Study Group, Institute on Rehabilitation Issues (27th, Washington, DC, May 2001).

    Science.gov (United States)

    Radtke, Jean, Ed.

    This book is a guide designed for rehabilitation agencies to plan for staff retirements and other turnover. It examines the process of succession planning, necessary tools, resources, and positioning the organization for future success. Chapters have the following titles: (1) "Succession Planning in a Dynamic Environment"; (2)…

  17. Transmission issues

    International Nuclear Information System (INIS)

    Bradford, J.; Wilson, L.; Thon, S.; Millar, N.

    2005-01-01

    This session on transmission issues focused on the role that transmission plays in electricity markets and the importance of getting the market structure right in terms of generation divestiture with buy back contracts, demand side responsive programs, transmission upgrades and long term contracts. The difficulties of distinguishing between market power and scarcity were examined along with some of the complications that ensue if transmission experiences congestion, as exemplified by the August 2003 blackout in eastern North America. The presentations described the best ways to handle transmission issues, and debated whether transmission should be deregulated or follow market forces. Issues of interconnections and reliability of connections were also debated along with the attempt to integrate renewables into the grid. Some presentations identified what new transmission must be built and what must be done to ensure that transmission gets built. The challenges and business opportunities for transmission in Alberta were discussed with reference to plans to invest in new infrastructure, where it is going outside of the province and how it works with other jurisdictions. Manitoba's Conawapa Hydro Project and its 2000 MW tie line to Ontario was also discussed. Some examples of non-optimal use of interconnections in Europe were also discussed in an effort to learn from these mistakes and avoid them in Canada. tabs., figs

  18. Aviation Safety Issues Database

    Science.gov (United States)

    Morello, Samuel A.; Ricks, Wendell R.

    2009-01-01

    The aviation safety issues database was instrumental in the refinement and substantiation of the National Aviation Safety Strategic Plan (NASSP). The issues database is a comprehensive set of issues from an extremely broad base of aviation functions, personnel, and vehicle categories, both nationally and internationally. Several aviation safety stakeholders such as the Commercial Aviation Safety Team (CAST) have already used the database. This broader interest was the genesis to making the database publically accessible and writing this report.

  19. Critical human-factors issues in nuclear-power regulation and a recommended comprehensive human-factors long-range plan. Critical discussion of human factors areas of concern

    International Nuclear Information System (INIS)

    Hopkins, C.O.; Snyder, H.L.; Price, H.E.; Hornick, R.J.; Mackie, R.R.; Smillie, R.J.; Sugarman, R.C.

    1982-08-01

    This comprehensive long-range human factors plan for nuclear reactor regulation was developed by a Study Group of the Human Factors Society, Inc. This Study Group was selected by the Executive Council of the Society to provide a balanced, experienced human factors perspective to the applications of human factors scientific and engineering knowledge to nuclear power generation. The report is presented in three volumes. Volume 1 contains an Executive Summary of the 18-month effort and its conclusions. Volume 2 summarizes all known nuclear-related human factors activities, evaluates these activities wherever adequate information is available, and describes the recommended long-range (10-year) plan for human factors in regulation. Volume 3 elaborates upon each of the human factors issues and areas of recommended human factors involvement contained in the plan, and discusses the logic that led to the recommendations

  20. Response to Environment Canada's framework for discussion on the environment. A summary of issues for input into The Green Plan: A national challenge

    International Nuclear Information System (INIS)

    1990-06-01

    A framework for discussion was published by the Canadian government in order to initiate discussion and encourage cooperative problem solving with respect to major environmental issues facing the country. A response to this framework for discussion from the Canadian Petroleum Association is provided, incorporating views and concerns expressed by the Association's member companies who collectively account for about 2/3 of all upstream petroleum industry spending in Canada. Key issues that most affect the upstream petroleum industry are discussed in the areas of sustainable development, consultation with all parties involved, balancing of economic and environmental costs, legislation and regulation, compliance and accountability, economic policy instruments, research and communication, strengthening of partnerships in environmental management, waste management and recycling, global warming, water pollution, Arctic environmental protection, environmental emergencies, parks, and wildlife. Detailed responses to issues are then presented. The Association's environmental program and its environmental code of practice are appended

  1. Parent Involvement and Extended Learning Activities in School Improvement Plans in the Midwest Region. Summary. Issues & Answers. REL 2011-No. 115

    Science.gov (United States)

    Kochanek, Julie Reed; Wraight, Sara; Wan, Yinmei; Nylen, Leslie; Rodriguez, Sheila

    2011-01-01

    According to the reauthorized Elementary and Secondary Education Act of 2001 (Public Law 107-110), commonly referred to as the No Child Left Behind (NCLB) Act, Title I schools that fail to make adequate yearly progress for two consecutive years are required to develop or revise school improvement plans aimed at boosting student achievement.…

  2. Fuels planning: science synthesis and integration; social issues fact sheet 01: Developing personal responsibility for fuels reduction: Building a successful program to engage property owners

    Science.gov (United States)

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    In the course of work as a land manager, you will no doubt be involved in developing programs to achieve various objectives, including the improvement of fuels management on private lands. This fact sheet describes six steps that will help you plan and conduct a successful program.

  3. SU-E-T-547: A Method to Correlate Treatment Planning Issue with Clinical Analysis for Prostate Stereotactic Body Radiotherapy (SBRT)

    International Nuclear Information System (INIS)

    Li, K; Jung, E; Newton, J; Cornell, D; Able, A

    2014-01-01

    Purpose: In this study, the algorithms and calculation setting effect and contribution weighing on prostate Volumetric Modulated Arc Therapy (VMAT) based SBRT were evaluated for clinical analysis. Methods: A low risk prostate patient under SBRT was selected for the treatment planning evaluation. The treatment target was divided into low dose prescription target volume (PTV) and high Dose PTV. Normal tissue constraints include urethra and femur head, and rectum was separated into anterior, lateral and posterior parts. By varying the constraint limit of treatment plan calculation setting and algorithms, the effect on dose coverage and normal tissue dose constraint parameter carried effective comparison for the nominal prescription and constraint. For each setting, their percentage differences to the nominal value were calculated with geometric mean and harmonic mean. Results: In the arbitrary prostate SBRT case, 14 variables were selected for this evaluation by using nominal prescription and constraint. Six VMAT planning settings were anisotropic analytic algorithm stereotactic beam with and without couch structure in grid size of 1mm and 2mm, non stereotactic beam, Acuros algorithm . Their geometry means of the variable sets for these plans were 112.3%, 111.9%, 112.09%, 111.75%, 111.28%, and 112.05%. And the corresponding harmonic means were 2.02%, 2.16%, 3.15%, 4.74%, 5.47% and 5.55%. Conclusions: In this study, the algorithm difference shows relatively larger harmonic mean between prostate SBRT VMAT plans. This study provides a methodology to find sensitive combined variables related to clinical analysis, and similar approach could be applied to the whole treatment procedure from simulation to treatment in radiotherapy for big clinical data analysis

  4. SU-E-T-547: A Method to Correlate Treatment Planning Issue with Clinical Analysis for Prostate Stereotactic Body Radiotherapy (SBRT)

    Energy Technology Data Exchange (ETDEWEB)

    Li, K; Jung, E; Newton, J [Associates In Medical Physics, Lanham, MD (United States); John R Marsh Cancer Center, Hagerstown, MD (United States); Cornell, D [John R Marsh Cancer Center, Hagerstown, MD (United States); Able, A [Associates In Medical Physics, Lanham, MD (United States)

    2014-06-01

    Purpose: In this study, the algorithms and calculation setting effect and contribution weighing on prostate Volumetric Modulated Arc Therapy (VMAT) based SBRT were evaluated for clinical analysis. Methods: A low risk prostate patient under SBRT was selected for the treatment planning evaluation. The treatment target was divided into low dose prescription target volume (PTV) and high Dose PTV. Normal tissue constraints include urethra and femur head, and rectum was separated into anterior, lateral and posterior parts. By varying the constraint limit of treatment plan calculation setting and algorithms, the effect on dose coverage and normal tissue dose constraint parameter carried effective comparison for the nominal prescription and constraint. For each setting, their percentage differences to the nominal value were calculated with geometric mean and harmonic mean. Results: In the arbitrary prostate SBRT case, 14 variables were selected for this evaluation by using nominal prescription and constraint. Six VMAT planning settings were anisotropic analytic algorithm stereotactic beam with and without couch structure in grid size of 1mm and 2mm, non stereotactic beam, Acuros algorithm . Their geometry means of the variable sets for these plans were 112.3%, 111.9%, 112.09%, 111.75%, 111.28%, and 112.05%. And the corresponding harmonic means were 2.02%, 2.16%, 3.15%, 4.74%, 5.47% and 5.55%. Conclusions: In this study, the algorithm difference shows relatively larger harmonic mean between prostate SBRT VMAT plans. This study provides a methodology to find sensitive combined variables related to clinical analysis, and similar approach could be applied to the whole treatment procedure from simulation to treatment in radiotherapy for big clinical data analysis.

  5. Year 2000 commercial issues

    Energy Technology Data Exchange (ETDEWEB)

    Kratz, M.P.J.; Booth, R.T. [Bennett Jones, Calgary, AB (Canada)

    1998-12-31

    This presentation focused on commercial aspects of the Y2K including: (1) special communication issues, (2) outsourcing transactions, (3) joint ventures and the significance for the oil and gas industry, and (4) contingency planning. Communication issues involve interaction with suppliers and vendors of critical systems, liability for Y2K communications (misrepresentation, defamation, promissory estoppel, statutory liability), securities disclosure (Canadian and US SEC requirements), protected communications, protection for Year 2000 statements. Outsourcing problems highlighted include resistance of suppliers to assume responsibility for Y2K problem remediation, factors which support and negate supplier responsibility, scope of suppliers` obligation, and warranties in respect of third party software. Regarding joint ventures, questions concerning limitations on liability, supply warranties, stand-by arrangements, stockpiling inventory, indemnities, confidentiality, operator compensation versus operator risk, and insurance were raised and addressed. Among contingency planning issues the questions of Y2K legal audit, and disclosure aspects of contingency planning were the featured concerns. figs.

  6. Year 2000 commercial issues

    International Nuclear Information System (INIS)

    Kratz, M.P.J.; Booth, R.T.

    1998-01-01

    This presentation focused on commercial aspects of the Y2K including: (1) special communication issues, (2) outsourcing transactions, (3) joint ventures and the significance for the oil and gas industry, and (4) contingency planning. Communication issues involve interaction with suppliers and vendors of critical systems, liability for Y2K communications (misrepresentation, defamation, promissory estoppel, statutory liability), securities disclosure (Canadian and US SEC requirements), protected communications, protection for Year 2000 statements. Outsourcing problems highlighted include resistance of suppliers to assume responsibility for Y2K problem remediation, factors which support and negate supplier responsibility, scope of suppliers' obligation, and warranties in respect of third party software. Regarding joint ventures, questions concerning limitations on liability, supply warranties, stand-by arrangements, stockpiling inventory, indemnities, confidentiality, operator compensation versus operator risk, and insurance were raised and addressed. Among contingency planning issues the questions of Y2K legal audit, and disclosure aspects of contingency planning were the featured concerns. figs

  7. SCP Tools user's guide: A knowledge base toolbox for documenting relationships among high-level issues and site studies planned for characterization of a repository site

    International Nuclear Information System (INIS)

    Korns, D.E.; Troy, K.S.

    1988-03-01

    This document describes a personal computer knowledge base system that ranges from issue identification to performance allocation of mined geologic disposal system site characteristics. With SCP Tools, a user can describe a system configuration, identify information needs and parameters and allocate performance of selected system characteristics. SCP Tools allows the user to define information needs for resolution of an issue; parameters required for an information need; measures of performance for parameters, and then link supporting parameters to performance parameters and performance parameters to performance measures. All this is done with computer tools that create non-redundant facts stored in a knowledge base. Unlike most information systems, the SCP Tools remember which facts were already collected, thus allowing greater flexibility and speed in appending facts and reducing the amount of hard disk storage

  8. Urban Organization and Planning in the Post-Industrial City: An Editorial and Introduction to the Spring 2006 Issue of Sociation Today

    Directory of Open Access Journals (Sweden)

    George H. Conklin

    2006-11-01

    Full Text Available 2006 is the year that the world as a whole becomes over half urban, yet no longer is the city the home of the industrial factory in the Western world. What shape should the new city take in the information age? Are we following an obsolete model when we plan in the Western world for a "new urbanism?" Does suburbanization have to fade away to promote racial justice? Why has urbanization concentrated poverty in the rural areas? We must re-examine these areas as sociologists and question past assumptions.

  9. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  10. Concerning safety issue associated with approval of modification of plan for reprocessing facilities of Power Reactor and Nuclear Fuel Development Corporation (reply to inquiry)

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    In response to an inquiry on the title issue received on Sept. 16, 1988, the Nuclear Safety Commission made an adequate study and submitted the findings to the Prime Minister on Oct. 20. the relevant modifications include the installation of combustion facilities comprising two furnaces to replace the existing facilities, and the addition of uranyl nitrate solution receiving equipment to the existing facilities for plutonium conversion technology development. The study addressed the effect of the modifications on the safety of the facilities and the environment. The combustion facilities, equipment and underground seepage water tank are designed in accordance with the applicable anti-earthquake standards. The facilities will be constructed of incombustible of flame-retardant materials. Equipment in the facilities will be used under negative pressure to prevent counterflow. Adequate measures will be taken for shielding, exposure control, waste disposal, etc. It is concluded that the modifications will not affect the safety of the reprocessing facilities. (Nogami, K.).

  11. Concerning safety issue associated with approval of modification of plan for reprocessing facilities of Power Reactor and Nuclear Fuel Development Corporation (reply to inquiry)

    International Nuclear Information System (INIS)

    1989-01-01

    In response to an inquiry on the title issue received on Sept. 16, 1988, the Nuclear Safety Commission made an adequate study and submitted the findings to the Prime Minister on Oct. 20. the relevant modifications include the installation of combustion facilities comprising two furnaces to replace the existing facilities, and the addition of uranyl nitrate solution receiving equipment to the existing facilities for plutonium conversion technology development. The study addressed the effect of the modifications on the safety of the facilities and the environment. The combustion facilities, equipment and underground seepage water tank are designed in accordance with the applicable anti-earthquake standards. The facilities will be constructed of incombustible of flame-retardant materials. Equipment in the facilities will be used under negative pressure to prevent counterflow. Adequate measures will be taken for shielding, exposure control, waste disposal, etc. It is concluded that the modifications will not affect the safety of the reprocessing facilities. (Nogami, K.)

  12. Family Issues

    Science.gov (United States)

    ... es Autismo? Family Issues Home / Living with Autism / Family Issues Stress Siblings A child’s autism diagnosis affects every member of the family in different ways. Parents/caregivers must now place their ... may put stress on their marriage, other children, work, finances, and ...

  13. Global Issues

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, J.L.

    2001-10-15

    Global Issues is an introduction to the nature and background of some of the central issues - economic, social, political, environmental - of modern times. This new edition of this text has been fully updated throughout and features expanded sections on issues such as global warming, biotechnology, and energy. Fully updated throughout and features expanded sections on issues such as global warming, biotechnology, and energy. An introduction to the nature and background of some of the central issues - economic, social, political, environmental - of modern times. Covers a range of perspectives on a variety of societies, developed and developing. Extensively illustrated with diagrams and photographs, contains guides to further reading, media, and internet resources, and includes suggestions for discussion and studying the material. (author)

  14. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  15. Information report issued by application of the article 145 of the Regulation by the mission of information on the management of radioactive materials and wastes on the behalf of the Commission on sustainable development and land planning - Nr 1218

    International Nuclear Information System (INIS)

    Bouillon, Christophe; Aubert, Julien

    2013-01-01

    This report first proposes a review of the issue of radioactive wastes in France: classification criteria, relationship between dangerousness and activity level, annual stock of radioactive wastes and materials in France, perspectives on a medium term in relationship with the evolution of the energy mix structure, a complex institutional system with different actors (Parliament, radioactive waste producers, the national agency for radioactive waste management - ANDRA, bodies and institutions in charge of regulation and control such as the ASN and the IRSN, but also NGOs and local information commissions). The next part addresses the issue of deep geological disposal of medium-activity long-life and high-activity wastes: international recommendations and solutions, other storage options (in sea or in space, sub-surface warehousing, and research on separation-transmutation), the choice made in time by France from the law of 1991 to the debate on the construction of Cigeo (the industrial centre for geological disposal). The last part addresses some questions which are still to be answered. They concern the Cigeo project (its costs, its reversibility, its integration within a land planning project), the governance and missions of the ANDRA, a better taking into account of all kinds of radioactive wastes (notably the mining wastes) and the idea of the introduction of a dangerousness threshold

  16. Business plan

    OpenAIRE

    Dorożyński, Tomasz; Urbaniak, Wojciech

    2016-01-01

    Running a business on an international scale requires not only a substantial body of knowledge but also the ability to apply it in practice. That is why our textbook, with a vast collection of practical examples, discusses a wide variety of pertinent issues connected with business operations in international markets, from international market analysis, drafting business plans, concluding business transactions and the insurance of goods through to customs clearance procedures and professional ...

  17. Accelerating News Issue 3

    CERN Document Server

    Kahle, K; Tanguy, C; Wildner, E

    2012-01-01

    This summer saw CERN announce to a worldwide audience the discovery of a Higgs-like boson, so this issue takes a look at the machine behind the discovery, the LHC, as well as future plans for a possible Higgs factory in the form of LEP3. Looking ahead too are European strategies for particle physics and accelerator-based neutrino physics. In addition, taking stock of the work so far, HiLumi LHC and EuCARD showcase their latest results.

  18. Fusion Canada issue 13

    International Nuclear Information System (INIS)

    1991-01-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on Canada's plans to participate in the Engineering Design Activities (EDA), bilateral meetings with Canada and the U.S., committee meeting with Canada-Europe, an update at Tokamak de Varennes on Plasma Biasing experiments and boronized graphite tests, fusion materials research at the University of Toronto using a dual beam accelerator and a review of the CFFTP and the CCFM. 2 figs

  19. Prioritization of generic safety issues

    International Nuclear Information System (INIS)

    Emrit, R.; Minners, W.; VanderMolen, H.

    1983-12-01

    This report presents the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The report focuses on the prioritization of generic safety issues. Issues primarily concerned with the licensing process or environmental protection and not directly related to safety have been excluded from prioritization. The prioritized issues include: TMI Action Plan items under development; previously proposed issues covered by Task Action Plans, except issues designated at Unresolved Safety Issues (USIs) which had already been assigned high priority; and newly-proposed issues. Future supplements to this report will include the prioritization of additional issues. The safety priority rankings are HIGH, MEDIUM, LOW, and DROP and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative

  20. PHYSICAL INFRASTRUCTURE: Crosscutting Issues Planning Conference Report

    Science.gov (United States)

    2001-10-01

    space, parks, and schools are all intermixed within walkable neighborhoods. What we’ve seen over the last 50 years is the tendency to isolate land...insert a mixed-use community into a suburb to bring a walkable neighborhood into a place that, for the most part, has been dependent on automobiles...aim for, to use the infrastructure in place to help reinsert mixed-use communities with transportation options, including walkability , into places

  1. Salt project environmental assessment issues and plans

    International Nuclear Information System (INIS)

    McIntosh, W.H.

    1983-01-01

    The provisions for public hearings provide for the public to raise the questions it believes need answered before that confidence is established. This paper describes (1) questions raised in the public hearings on potentially acceptable sites, (2) the long process of providing answers to the questions, and (3) some ways for the participants in the process to become confident that enough is known to proceed through each step of repository development. 14 references, 4 tables

  2. Advance Care Planning: Medical Issues to Consider

    Science.gov (United States)

    ... person with Chronic Obstructive Pulmonary Disease (COPD) may tire considerably from the work of breathing. Intermittent use ... the procedure. Body chemistry can go out of balance. Anemia (low red blood cell count) can occur. ...

  3. The transportation issue management system: A tool for issue resolution

    International Nuclear Information System (INIS)

    Branch, K.M.; Boryczka, M.K.

    1987-01-01

    During the last decade, issue management programs have been developed and used by a number of large corporations in the United States. These systems have generally been designed to help senior program managers identify issues, develop strategic plans, and resolve issues. These systems involve scanning and abstracting literature to create a database that is then used for 1) issue identification, 2) issue analysis, 3) priority assessment, 4) development of corporate position/strategic options, and 5) action planning and implementation. Most of the existing systems rely on staff to identify trends in the computerized output, analyze the importance of the issue to the company, and assist in developing corporate responses. The Department of Energy has recently developed an issue management system for the Office of Civilian Radioactive Waste Management's (OCRWM) transportation program. This system is designed to help DOE identify institutional issues related to radioactive waste transportation, analyze the issues, and resolve them in a manner that is responsive to interested parties. The system will contain pertinent information from DOE technical reports, other federal documents, correspondence, professional journals, popular literature, newsclips, legislation and testimony. The program is designed around a number of institutional issues including: prenotification, physical protection procedures; highway, rail, and barge routing; inspections and enforcement of shipments; emergency response; liability, cask design and testing; overweight trucks; rail service; modal mix; infrastructure improvements; training standards, and operational procedures

  4. Workforce Issues.

    Science.gov (United States)

    1996

    This document consists of four papers presented during a symposium on work force issues moderated by Jan DeJong at the 1996 conference of the Academy of Human Resource Development (AHRD). "Rethinking the Ties that Bind: An Exploratory Study of Employee Development in Utilities in Canada and the United States" (Michael Aherne, David…

  5. Sanskrit Issue.

    Science.gov (United States)

    Miller, Barbara Stoler, Ed.

    1971-01-01

    This issue of "Mahfil" is devoted to Sanskrit literature and contains a note on Sanskrit pronunciation and selections of Sanskrit literature. It also contains articles analyzing and discussing various aspects of the literature, including "Sanskrit Rhetoric and Poetic,""The Creative Role of the Goddess Vac in the…

  6. Bond Issues.

    Science.gov (United States)

    Pollack, Rachel H.

    2000-01-01

    Notes trends toward increased borrowing by colleges and universities and offers guidelines for institutions that are considering issuing bonds to raise money for capital projects. Discussion covers advantages of using bond financing, how use of bonds impacts on traditional fund raising, other cautions and concerns, and some troubling aspects of…

  7. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  8. The nuclear emergency plans

    International Nuclear Information System (INIS)

    Fuertes Menendez, M. J.; Gasco Leonarte, L.; Granada Ferrero, M. J.

    2007-01-01

    Planning of the response to emergencies in nuclear plants is regulated by the Basic Nuclear Emergency Plan (PLABEN). This basic Plan is the guidelines for drawing up, implementing and maintaining the effectiveness of the nuclear power plant exterior nuclear emergency plans. The five exterior emergency plans approved as per PLABEN (PENGUA, PENCA, PENBU, PENTA and PENVA) place special emphasis on the preventive issues of emergency planning, such as implementation of advance information programs to the population, as well as on training exercises and drills. (Author)

  9. Theoretical Issues

    Energy Technology Data Exchange (ETDEWEB)

    Marc Vanderhaeghen

    2007-04-01

    The theoretical issues in the interpretation of the precision measurements of the nucleon-to-Delta transition by means of electromagnetic probes are highlighted. The results of these measurements are confronted with the state-of-the-art calculations based on chiral effective-field theories (EFT), lattice QCD, large-Nc relations, perturbative QCD, and QCD-inspired models. The link of the nucleon-to-Delta form factors to generalized parton distributions (GPDs) is also discussed.

  10. Miscellaneous issues

    International Nuclear Information System (INIS)

    2002-01-01

    The New Brunswick Market Design Committee has examined several issues regarding the restructuring of the province's electricity sector. This report presents issues that require guidance for implementation, with particular focus on options available for their resolutions. The issues include: (1) rate principles for stranded offer service (SOS) supply, (2) the ability of contestable customers to return to SOS after having left it, (3) whether loads embedded in distribution systems are eligible to participate in the bilateral contract market, (4) whether generators or suppliers can offer capacity and energy to SOS suppliers in competition with the SOS supplier, and (5) details for the balancing market, including pricing, bidding protocols, settlements and how intermittent power sources can participate in the market. A section on pricing for SOS explains pricing principles, the use of export profits, pricing for SOS capacity, and time of use pricing. The Committee has made recommendations for the electricity system in the province to have an energy imbalance service that can move towards a market in order to develop an efficient and effective service. This report also explains pricing in the balancing market, penalties, and settlements. 7 refs

  11. Definition of containment issues

    International Nuclear Information System (INIS)

    Walker, D.H.

    1982-01-01

    Public Law 96-567 Nuclear Safety Research, Development and Demonstration Act of 1980, directed the US Department of Energy (DOE) to provide an accelerated and coordinated program for developing practical generic improvements that would enhance the capability for safe, reliable and economical operation of Light Water Nuclear Reactor Power Stations. The DOE approach to defining such a program will consist of two phases, (1) definition of program requirements and (2) implementation of the program plan. This paper summarizes the results of the program definition phase for the containment integrity function. The definition phase effort was carried out by two groups of knowledgeable technical experts from the nuclear industry, one of which addressed containment integrity. Tabulated in the paper are the issues identified by the working groups and their associated priorities. Also tabulated are those high priority issues for which ongoing programs do not appear to provide sufficient information to resolve the issue. The results of this review show that existing programs to a great extent address existing issues in a manner such that the issues should be resolved by the programs

  12. 7 CFR 1210.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plan. 1210.303 Section 1210.303 Agriculture... PLAN Watermelon Research and Promotion Plan Definitions § 1210.303 Plan. Plan means this watermelon research and promotion Plan issued by the Secretary pursuant to the Act. ...

  13. Liability Issues

    International Nuclear Information System (INIS)

    O’Donoghue, K.

    2016-01-01

    Nuclear liability conventions try to provide a set of rules to govern third party liability. Not all States are parties to one of the existing liability conventions. There are a number of reasons why individual States may choose not to join one of the existing conventions. These include limits of compensation, jurisdiction issues, complexity, cost and definition of damage among others. This paper looks at the existing conventions and identifies some of the main issues in the existing conventions which prevent some States from signing them. The paper attempts to tease out some of the perceived gaps in the existing conventions and give a brief description of the reasons why non-Contracting Parties have difficulty with the provisions of the conventions. The paper recognizes that there has been work done in this area previously by the International Expert Group on Nuclear Liability (INLEX) and others to try to develop the existing frameworks to enhance global adherence by nuclear and non-nuclear States to an effective nuclear liability regime. (author)

  14. State regulatory issues in acid rain compliance

    International Nuclear Information System (INIS)

    Solomon, B.D.; Brick, S.

    1992-01-01

    This article discusses the results of a US EPA workshop for state regulators and commission staff on acid rain compliance concerns. The topics of the article include the results of market-based emissions control, how emissions trading is expected to reduce emissions, public utility commissions approval of compliance plans, the purposes of the workshop, market information, accounting issues, regulatory process and utility planning, multi-state compliance planning, and relationship to other compliance issues

  15. Key Issue

    Directory of Open Access Journals (Sweden)

    Oya Y Rieger

    2012-03-01

    Full Text Available A few months ago, while I was participating in a conference about open access infrastructures, a delegate from a governmental agency asked, “Why does each library need to maintain a repository for their own scientists?” He was rightfully wondering if a broad collaboration in building a network of archives will provide a durable and extensible technology and service framework for ever-increasing digital scholarly content. The ensuing discussion did not offer a plausible response but accentuated that we do not have in place a plan for building an expandable infrastructure to facilitate communication and exchange of information among rapidly proliferating distinct instances of institutional and subject repositories.

  16. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  17. Vacuum systems - thermal issues

    International Nuclear Information System (INIS)

    Howell, J.W.

    1992-01-01

    The new high-energy synchrotron light sources currently under construction and the B-factories that are still in the planning stage present new challenges in the management of synchrotron radiation thermal loading. With particle energies from 6 to 9 GeV and currents from 0.3 to 2.5 mA, the total power and the power density of the resulting synchrotron radiation each present unique problems. The design issues involved in managing these new power levels are presented, as well as a survey of some of the proposed design solutions

  18. Burning issues

    International Nuclear Information System (INIS)

    Raloff, J.

    1993-01-01

    The idea of burning oil slicks at sea has intrigued oil-cleanup managers for more than a decade, but it wasn't until the advent of fireproof booms in the mid-1980's and a major spill opportunity (the March 1989 Exxon Valdez) that in-situ burning got a real sea trial. The results of this and other burning experiments indicate that, when conditions allow it, nothing can compete with fire's ability to remove oil from water. Burns have the potential to remove as much oil in one day as mechanical devices can in one month, along with minimal equipment, labor and cost. Reluctance to burn in appropriate situations comes primarily from the formation of oily, black smoke. Analysis of the potentially toxic gases have been done, indicating that burning will not increase the levels of polluting aldehydes, ketones, dioxins, furans, and PAHs above those that normally evaporate from spilled oil. This article contains descriptions of planned oil fires and the discussion on the advantages and concerns of such a policy

  19. Transitional issues

    International Nuclear Information System (INIS)

    1998-01-01

    This discussion paper, the fifth in the series developed at the IPPSO Market Design Conference, addressed the issue of the need to prevent Ontario Hydro from taking unfair advantage of independent producers and other stakeholders through activities and investments in new power generating capacity in the transitional period leading up to deregulation. The need for controls is predicated on the assumption that the short-term actions and investments of Ontario Hydro could seriously compromise the position of independent generators, and that without such controls the level playing field essential to the operation of a competitive market, does not exist. Various actual and potential actions of Ontario Hydro were discussed, all of which point to the need for strict controls over Ontario Hydro exercising its dominant market power in an unfair way. It was recommended that as a minimum, the provincial government should no longer provide guarantees for Ontario Hydro capital projects, and that Ontario Hydro be instructed to defer any investment on new or returning generating capacity until the new market is in place. Limits could also be placed on Ontario Hydro's marketing efforts to enter into contracts during the transition period, and Ontario Hydro and municipal utilities should be required to keep separate accounts of their commercial preparation, and to settle such accounts separate from ratepayer revenue

  20. Key issues

    International Nuclear Information System (INIS)

    Cook, N.G.W.

    1980-01-01

    Successful modeling of the thermo-mechanical and hydrochemical behavior of radioactive waste repositories in hard rock is possible in principle. Because such predictions lie outside the realm of experience, their adequacy depends entirely upon a thorough understanding of three fundamental questions: an understanding of the chemical and physical processess that determine the behavior of rock and all its complexities; accurate and realistic numerical models of the geologic media within which a repository may be built; and sufficient in-situ data covering the entire geologic region affected by, or effecting the behavior of a repository. At present sufficient is known to be able to identify most of those areas which require further attention. These areas extend all the way from a complete understanding of the chemical and physical processes determining the behavior of rock through to the exploration mapping and testing that must be done during the development of any potential repository. Many of the techniques, laboratory equipment, field instrumentation, and numerical methods needed to accomplish this do not exist at present. Therefore it is necessary to accept that a major investment in scientific research is required to generate this information over the next few years. The spectrum of scientific and engineering activities is wide extending from laboratory measurements through the development of numerical models to the measurement of data in-situ, but there is every prospect that sufficient can be done to resolve these key issues. However, to do so requires overt recognition of the many gaps which exist in our knowledge and abilities today, and of the need to bridge these gaps and of the significant costs involved in doing so

  1. Broadband network selection issues

    Science.gov (United States)

    Leimer, Michael E.

    1996-01-01

    Selecting the best network for a given cable or telephone company provider is not as obvious as it appears. The cost and performance trades between Hybrid Fiber Coax (HFC), Fiber to the Curb (FTTC) and Asymmetric Digital Subscriber Line networks lead to very different choices based on the existing plant and the expected interactive subscriber usage model. This paper presents some of the issues and trades that drive network selection. The majority of the Interactive Television trials currently underway or planned are based on HFC networks. As a throw away market trial or a short term strategic incursion into a cable market, HFC may make sense. In the long run, if interactive services see high demand, HFC costs per node and an ever shrinking neighborhood node size to service large numbers of subscribers make FTTC appear attractive. For example, thirty-three 64-QAM modulators are required to fill the 550 MHz to 750 MHz spectrum with compressed video streams in 6 MHz channels. This large amount of hardware at each node drives not only initial build-out costs, but operations and maintenance costs as well. FTTC, with its potential for digitally switching large amounts of bandwidth to an given home, offers the potential to grow with the interactive subscriber base with less downstream cost. Integrated telephony on these networks is an issue that appears to be an afterthought for most of the networks being selected at the present time. The major players seem to be videocentric and include telephony as a simple add-on later. This may be a reasonable view point for the telephone companies that plan to leave their existing phone networks untouched. However, a phone company planning a network upgrade or a cable company jumping into the telephony business needs to carefully weigh the cost and performance issues of the various network choices. Each network type provides varying capability in both upstream and downstream bandwidth for voice channels. The noise characteristics

  2. Current Issues and Distributive Justice.

    Science.gov (United States)

    Rosal, Lorenca Consuelo

    1992-01-01

    Provides a lesson plan on the issue of distributive justice, or fairness in the ways things are distributed among individuals and groups. Includes a student reading concerning a proposed guaranteed standard of living. Proposes an activity that calls for student discussion of a constitutional amendment that would offer such a guarantee. (SG)

  3. Issues for the 1990s.

    Science.gov (United States)

    Weiner, Edith; Brown, Arnold

    1986-01-01

    Discussed are the issues now emerging that seem likely to dominate thinking, planning, and decision-making in the United States and elsewhere during the next decade. These include campus unrest, China as a world economic force, controlling health-care, birth defects, role of the computer in education, and human language/computer language. (RM)

  4. Complicating Issues in Holocaust Education

    Science.gov (United States)

    Lindquist, David H.

    2010-01-01

    Confronting the Holocaust in a classroom setting involves a complex undertaking that demands careful planning as educators develop and present curricula on the subject to their students. This article explores another problematic factor involved in teaching the Shoah, that is, several issues that exist outside the content/pedagogical framework but…

  5. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  6. On strategic spatial planning

    Directory of Open Access Journals (Sweden)

    Tošić Branka

    2014-01-01

    Full Text Available The goal of this paper is to explain the origin and development of strategic spatial planning, to show complex features and highlight the differences and/or advantages over traditional, physical spatial planning. Strategic spatial planning is seen as one of approaches in legally defined planning documents, and throughout the display of properties of sectoral national strategies, as well as issues of strategic planning at the local level in Serbia. The strategic approach is clearly recognized at the national and sub-national level of spatial planning in European countries and in our country. It has been confirmed by the goals outlined in documents of the European Union and Serbia that promote the grounds of territorial cohesion and strategic integrated planning, emphasizing cooperation and the principles of sustainable spatial development. [Projekat Ministarstva nauke Republike Srbije, br. 176017

  7. Reagan issues mineral policy

    Science.gov (United States)

    The National Materials and Minerals Program plan and report that President Reagan sent to Congress on April 5 aims to ‘decrease America's minerals vulnerability’ while reducing future dependence on potentially unstable foreign sources of minerals. These goals would be accomplished by taking inventory of federal lands to determine mineral potential; by meeting the stockpile goals set by the Strategic and Critical Material Stockpiling Act; and by establishing a business and political climate that would encourage private-sector research and development on minerals.Now that the Administration has issued its plan, the Subcommittee on Mines and Mining of the House Committee on Interior and Insular Affairs will consider the National Minerals Security Act (NMSA), which was introduced 1 year ago by subcommittee chairman Jim Santini (D-Nev.) [Eos, May 19, 1981, p. 497]. The bill calls for establishing a three-member White-House-level council to coordinate the development of a national minerals policy; amending tax laws to assist the mining industry to make capital investments to locate and produce strategic materials; and creating a revolving fund for the sale and purchase of strategic minerals. In addition, the NMSA bill would allow the secretary of the interior to make previously withdrawn public lands available for mineral development. The subcommittee will hold a hearing on the Administration's plan on May 11. Interior Secretary James Watt has been invited to testify.

  8. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  9. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  10. Issues in focus.

    Science.gov (United States)

    1994-08-01

    The issues worldwide that deserve attention pertain to international migration, the education of women, family planning, missing female children, and prevention and control of AIDS cases. Migration outside country borders has been increasing due to economic and social disparities, and uncounted and unrecognized refugees are fleeing environmental disasters. The educational status of women has increased over the past 30 years. For example, female illiteracy has declined among women aged 20-24 years from 19% to 8% in Latin America, from 38% to 12% in eastern and western Asia, and from 80% to 49% in Africa. These improvements are significant, but the problem remains, where, for instance in Africa, there is still extensive illiteracy (75% of females aged under 25 years). A 1993 Population Action International Report states that low female educational levels and weak family planning and health programs are related to large family size and high child death rates. During the 1980s family planning was linked with ecological concerns. Progress has been made in the increase in contraceptive users in developing countries from 14% to 53% during 1965-70. Fertility has declined from 6.1 children per woman in the 1950s to 3.7. Kenya is a good example of a country with high fertility that reduced fertility through its emphasis on family planning. Obstacles to increased prevalence of contraception still remain. In Mexico more than 50% of public birth control services are provided to women in secret due to fear of their husband's abuse. Population pressure can result in the loss of girl children through higher mortality, better nutrition, neglect, or gender preference in the early fetal stages. The challenge of AIDS will be in caring for the sick and adjusting to social changes due to the expected increases in orphaned children.

  11. Retail Tactical Planning: An Aligned Process?

    OpenAIRE

    Dreyer , Heidi; Dukovska-Popovska , Iskra; Kiil , Kasper; Kaipia , Riikka

    2016-01-01

    Part 9: Quality in Production Management; International audience; This paper addresses tactical planning in retailing through a case study approach in one grocery retailing company. The issues are how tactical planning is conducted and how the different plans are connected. The study complements earlier retail planning studies by showing the sequence of planning phases and by studying the fragmented plans as a process. The master category planning is important and sets borders for the other p...

  12. On the scope of the Federal Government to issue orders in plan approval procedures under para. 9b of the Atomic Energy Act as provided by article 85 section 3 of the Basic Law

    International Nuclear Information System (INIS)

    Ossenbuehl, F.

    1991-01-01

    Under Paragraph 9b of the Atomic Energy Act the Lower Saxonian Minister of the Environment has the competence for the plan approval procedure concerning the final disposal site Konrad. The plan approval procedure under atomic energy law is a unitary administrative procedure which makes further administrative procedures and administrative decisions superfluous on the strength of its unitary character and without impingement on constitutional law. In conducting the plan approval procedure the Lower Saxonican Minister of the Environment is acting within the framework of Laender administration on behalf of the Federation. To this extent he is subject to the orders of the Federal Minister of the Enviroment under Article 85 Section 3 of The Basic Law with respect to the formation of the procedure and procedural decisions as well as decisions on the merits pending. The concentrating effect of the plan approval procedure under atomic energy law also extends to permits under water law. (orig./HSCH) [de

  13. Nuclear fusion: The issues

    International Nuclear Information System (INIS)

    Griffin, R.D.

    1993-01-01

    The taming of fusion energy, has proved one of the most elusive quests of modern science. For four decades, the United States has doggedly pursued energy's holy grail, pumping more than $9 billion into research and reactor prototypes. This year, the federal government is slated to spend $339 million on fusion, more than the combined amount the government will spend for research on oil, natural gas, solar power, wind power, geothermal energy, biofuels and conservation. This article summarizes the technical, political in terms of international cooperation, economic, planning, etc. issues surrounding the continued development of fusion as a possible power source for the next century. Brief descriptions of how fusion works and of the design of a tokamak fusion machine are included

  14. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  15. Influenza pandemic planning guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  16. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  17. IJIMAI Editor's Note - Vol. 3 Issue 7

    Directory of Open Access Journals (Sweden)

    Oscar Sanjuan-Martinez

    2016-06-01

    Full Text Available The research works presented in this issue are based on various topics of interest, among which are included: SVM and ANN Based Classification, Security in Android, Semantic Data, Planning and Software Agents, Mission Planning, Clustering in Text Mining, Mobile Networks, Weather Radars, Human Activity Recognition, LIF Neurons and DDF, Theft Prevention, Constraint Programming, Measuring Meditations Effects, Neural Networks and Deep Learning.

  18. Language Planning: Corpus Planning.

    Science.gov (United States)

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  19. Internet Ethics Issues and Actions in Japan

    OpenAIRE

    江澤, 義典

    2013-01-01

    The International Symposium on Internet Ethics 2012 was planned and organized by the Korea Internet Security Agency and was held in September 2012 at the Lotte Hotel World in Seoul. This note relates to the presentation in Japan, it outlines current Internet ethics issues and actions in Japan. Moreover, four aspects of Japanese civilization were introduced as the bases of these ethics issues.

  20. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  1. Accelerator Availability and Reliability Issues

    Energy Technology Data Exchange (ETDEWEB)

    Steve Suhring

    2003-05-01

    Maintaining reliable machine operations for existing machines as well as planning for future machines' operability present significant challenges to those responsible for system performance and improvement. Changes to machine requirements and beam specifications often reduce overall machine availability in an effort to meet user needs. Accelerator reliability issues from around the world will be presented, followed by a discussion of the major factors influencing machine availability.

  2. A prioritization of generic safety issues

    International Nuclear Information System (INIS)

    Emrit, R.; Riggs, R.; Milstead, W.; Pittman, J.

    1991-07-01

    This report presents the priority rankings for generic safety issues and related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The report focuses on the prioritization of generic safety issues. Issues primarily concerned with the licensing process or environmental protection and not directly related to safety have been excluded from prioritization. The prioritized issues include: TMI Action Plan items under development; previously proposed issues covered by Task Action Plans, except issues designated as Un-resolved Safety Issues (USIs) which had already been assigned high priority; and newly-proposed issues. Future supplements to this report will include the prioritization of additional issues. The safety priority rankings are High, Medium, Low, and Drop and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative. 1310 refs

  3. Improving Teacher Quality and Effectiveness. Issues for the '80s. Planning Grant for the Development of an Institutional Grant Proposal to Establish an NIE Research and Development Center for Teacher Quality and Effectiveness.

    Science.gov (United States)

    Hawley, Willis D.; And Others

    This paper presents an overview of several of the problems and conditions of the teaching profession and discusses different issues related to the development and implementation of policies, programs, and practices designed to address them. The opening section examines the conditions of teaching--employment opportunities, teacher evaluation,…

  4. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  5. ACNW - 1998 strategic plan

    International Nuclear Information System (INIS)

    1998-01-01

    This plan provides strategic direction to The Advisory Committee on Nuclear Waste (ACNW) in 1998 and beyond for focusing on issues most important to the NRC in carrying out its mission of protecting public health and safety, promoting the common defense and security, and protecting the environment

  6. Planning for Accessibility.

    Science.gov (United States)

    Spoor, Dana L.

    1997-01-01

    Argues that barrier-free designs should be incorporated in the first steps of school facility planning to avoid the difficulties in meeting Americans with Disabilities Act (ADA) guidelines during renovations. Explains why not all barriers need be removed to make a facility accessible to everyone. Discusses issues involving ADA guidelines and child…

  7. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  8. Draft Transportation Institutional Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  9. Feminist issues in development.

    Science.gov (United States)

    Antrobus, P

    1987-01-01

    The United Nations Decade for the Advancement of Women, from 1975 to 1985, leaves a legacy of a deeper understanding of the issues, and the emergence of new networks with the experience and commitment to work for further changes. However, the role and status of women did not improve. There is a new commitment to struggle for the ending of all oppression, injustice and violence of all kinds at all levels. Feminism is a consciousness of all forms of women's oppression and a commitment to work against them. Feminist critiques illuminate the larger structures that oppress both women and men. New development theories embracing feminism are necessary to understand how patriarchy and economic systems propogate oppression. The production-oriented approach to rural development is flawed n failing to address women's lack of access to land, credit, training and new technologies. Overwhelming household tasks, cultural norms, and traditional attitudes limit women's involvement in training programs and other development activities. The basic needs approach to rural development provides access to vital services to meet a family's basic needs for nutrition, housing and clothing, and allows people's participation in decision making. However, women have little actual role in decision making so their needs, concerns and perspectives are not taken into account. Women are treated as instruments to achieve goals without appreciating their perspective. Project-based approached emphasize short term goals rather than laying the foundation for longterm changes. Few projects address structural issues or empower women. Projects must include education to increase personal growth and self reliance. Development planning can be enormously enhanced by taking gender differences into account and recognizing that people, specially poor women, can promote their own devleopment. Longterm strategies that challenge existing structures, address the existing economic order, and, most of all, recognize

  10. Discussion of the question whether a local authority can claim to be affected in its planning competence by a permit issued for construction of a radwaste processing plant. High Administrative Court Lueneburg, judgement of 21.1.1993 - 7 K 5/90

    International Nuclear Information System (INIS)

    Czajka, D.

    1993-01-01

    A local authority has taken legal action against the first partial permit for the construction of a radwaste conditioning pilot plant at Gorleben, claiming to be affected in its planning competence by the fact that transport of spent fuel elements between the spent fuel storage facility and the pilot plant 2 km away would have to proceed on the rural district road. The action has been discussed. Appealable head notes: A local authority is not affected in its planning competence by a permit issued for construction of a facility for radwaste processing, although the operation of said facility may result in radwaste being transported by a road crossing the local authority's territory. (orig.) [de

  11. Do's and Don'ts of Computer Models for Planning

    Science.gov (United States)

    Hammond, John S., III

    1974-01-01

    Concentrates on the managerial issues involved in computer planning models. Describes what computer planning models are and the process by which managers can increase the likelihood of computer planning models being successful in their organizations. (Author/DN)

  12. 40 CFR 300.220 - Related Title III issues.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Related Title III issues. 300.220 Section 300.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... PLAN Planning and Preparedness § 300.220 Related Title III issues. Other related Title III requirements...

  13. Archives: Town and Regional Planning

    African Journals Online (AJOL)

    Items 1 - 12 of 12 ... Archives: Town and Regional Planning. Journal Home > Archives: Town and Regional Planning. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register · Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives. 1 - 12 of 12 ...

  14. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  15. Sex: a sensitive issue.

    Science.gov (United States)

    1997-01-01

    Health care workers and educators may need to improve their skills in discussing sensitive issues in order to elicit and understand what influences people's attitudes toward sex. While the health worker may be bent upon preventing HIV infection, advising on family planning, or teaching youth about sexual relationships, his or her audience may have other priorities. A good counselor/teacher must learn what people's concerns are and discuss sexual health within that context. It can be difficult talking about sex because sex is a private concern and many people are embarrassed discussing it. Even sex partners often find it difficult to talk to each other about sex. Appropriate communication techniques vary depending upon the situation. It depends upon whether one is addressing people on an individual basis or in groups, which people are being addressed, which organization one is representing, and what one's role is. Good communication is a two-way sharing of information. The different stages of life, common beliefs and myths, culture and religion, relationships between men and women, reasons for having sex, and sex practices are discussed.

  16. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  17. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  18. Budget model can aid group practice planning.

    Science.gov (United States)

    Bender, A D

    1991-12-01

    A medical practice can enhance its planning by developing a budgetary model to test effects of planning assumptions on its profitability and cash requirements. A model focusing on patient visits, payment mix, patient mix, and fee and payment schedules can help assess effects of proposed decisions. A planning model is not a substitute for planning but should complement a plan that includes mission, goals, values, strategic issues, and different outcomes.

  19. The analysis of strategic planning in transport

    OpenAIRE

    Išoraitė, Margarita

    2006-01-01

    Strategic planning is a process whish brings to life the mission and vision of an enterprise. The article analyses the following issues: 1. Concepts of strategy. 2. Components of strategic planning. 3. The basis of strategic planning. 4. Formal strategic planning. 5. Tools used in strategy development. 6. Problems of strategic planning. Strateginis planavimas yra procesas, kurio metu įgyvendinami įmonės tikslai. Šiame straipsnyje nagrinėjama: strategijos sąvoka; strateginio planavimo kompo...

  20. Current Issues in LPP Research and Their Impact on Society

    Science.gov (United States)

    Darquennes, Jeroen

    2013-01-01

    After a very broad description of what language policy and planning is about this paper presents an overview of some of the current preoccupations of researchers focusing on language policy and planning as one of the blooming fields of applied linguistics. The current issues in language policy and planning research that are dealt with include…

  1. Issues for the Traveling Team Physician.

    Science.gov (United States)

    Kaeding, Christopher C; Borchers, James

    2016-07-01

    This article outlines the value of having the team physician traveling with athletes to away venues for competitions or training sessions. At present, this travel presents several issues for the team physician who crosses state lines for taking care of the athletes. In this article, these issues and their possible remedies are discussed. A concern for the travelling team physician is practicing medicine while caring for the team in a state where the physician is not licensed. Another issue can be the transportation of controlled substances in the course of providing optimal care for the team athletes. These two issues are regulatory and legislative issues at both the state and federal levels. On the practical side of being a team physician, the issues of emergency action plans, supplies, and when to transport injured or ill patients are also reviewed. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  2. Disciplinary Fragmentation in Comprehensive Issues

    DEFF Research Database (Denmark)

    Lauridsen, Erik Hagelskjær

    2004-01-01

    The geographical and spatial proximity of the activities in the Songkhla Lake Bassin ties the region together trough the common use of the lake waters as a resource or a discharge media as well as a regional economy, the capacities of a common workforce, local demographic features and the social...... to social and economic factors are not subjects of specific analysis in the literature. They can to some extent be derived from the assumptions of the articles on environmental planning: Socio-economic data are available as statistics for the area, but they are not related to the concrete sources...... of environmental degradation of the lakes. Articles on environmental planning contain a more integrated understanding of the environmental degradation as a result of social activities. But also here the scope of the studies tend to be limited to the water related issues. The results of the literature survey...

  3. Special Issues in Working with Gifted Minority Adolescents.

    Science.gov (United States)

    Lindstrom, Rena R.; Van Sant, Sondra

    1986-01-01

    Gifted adolescents from minority groups face the same issues all gifted young people face, but the addition of racial and cultural factors increases the complexity of these issues. Discusses individual versus cultural pressures that affect identity, issues related to assisting students with long-range planning, and two models for programming.…

  4. Forward planning

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  5. Special issue introduction: Ecological modernization

    DEFF Research Database (Denmark)

    Massa, Ilmo; Andersen, Mikael Skou

    2000-01-01

    The contributions to this special issue of the Journal of Environmental Policy and Planning stem from an international conference on ecological modernization that took place at the Department of Social Policy of the University of Helsinki, Finland, in late 1998. They have been selected, among other...... reasons, for their possible contribution to conceptual understanding and clarification. While recent publications have explored the implications of ecological modernization in different settings (Mol & Sonnenfeld, 2000), here we try to put the concept under the microscope again, in the hope of clarifying...

  6. Census 2001: issues and perspectives.

    Science.gov (United States)

    1998-01-01

    This article discusses the Census of India for 2001 and gender issues such as the sex ratio, undercounts of girls, tribe and scheduled caste data, and the data users' conference. The April 1998 conference was attended by representatives of government planning and development departments, research institutions, and statisticians and researchers. Under consideration was a government Ministry of Welfare proposal to reintroduce, after a 60-year hiatus, data by scheduled caste and tribe. This issue is complicated by criteria that vary by state and includability. Quotas for backward classes in educational institutions, government jobs, and in decision-making bodies are the reason for designations by caste. Some groups are distressed because of lack of inclusion as backward classes. M.N. Srinivas strongly advises that counting by caste will create problems for enumerators and will result in lawsuits and violent disturbances. G. Shah argues that caste counts will not weaken the caste system nor expand their political power, but will intensify internal conflicts between the Dalit and Bahujan movements. One other issue is the reintroduction of the 1961 Household schedule which provides family composition by landholding size and household enterprise. Krishnaji advises that this data would help analyze sex ratio imbalances. In 1997, the Core Group examined gender equity issues and operational issues about increasing the scope without increasing costs. The Core Group recommended caste data at the district and sub-district level. Undercounting of the female work force is a continuing issue from the 1991 Census. Suggestions by the Core Group are indicated in brief.

  7. JPRS Report, Proliferation Issues

    Science.gov (United States)

    1992-06-25

    control of INGTON POST saying: "Secretary of Defense Richard Nuclemon Minero Quimica Ltda. [Nuclebras Monazite and Cheney approved the Pentagon’s plan ... Planned [Alm a-Ata Radio] .................................................................................................. 26 Krasnoyarsk Search for...34 [Article by political staff: "Space plan defended"] He said the aim of the investigation was to determine the market opportunities, risks and

  8. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  9. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  10. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... Near-fault earthquake issue is almost a new issue in earthquake engineering. ... although those countries had advanced regulations for seismic design of ... allocating the plastic joints according to development guideline and ...

  11. Future accelerators: physics issues

    International Nuclear Information System (INIS)

    Bjorken, J.D.

    1977-11-01

    High energy physics of the future using future accelerators is discussed. The proposed machines and instruments, physics issues and opportunities including brief sketches of outstanding recent results, and the way the proposed machines address these issues are considered. 42 references

  12. Medical Issues: Orthopedics

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > orthopedics Orthopedics In SMA, muscle weakness can cause ...

  13. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  14. Health Issues and Treatments

    Science.gov (United States)

    ... About Us Information For… Media Policy Makers Health Issues & Treatments Language: English (US) Español (Spanish) Recommend on ... people with spina bifida are exactly alike. Health issues and treatments for people with spina bifida will ...

  15. Medical Issues: Breathing

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > breathing Breathing Breathing problems are the most common ...

  16. Space Station Engineering Design Issues

    Science.gov (United States)

    Mcruer, Duane T.; Boehm, Barry W.; Debra, Daniel B.; Green, C. Cordell; Henry, Richard C.; Maycock, Paul D.; Mcelroy, John H.; Pierce, Chester M.; Stafford, Thomas P.; Young, Laurence R.

    1989-01-01

    Space Station Freedom topics addressed include: general design issues; issues related to utilization and operations; issues related to systems requirements and design; and management issues relevant to design.

  17. Seven Issues, Revisited

    OpenAIRE

    Whitehead, Jim; De Bra, Paul; Grønbæk, Kaj; Larsen, Deena; Legget, John; schraefel, monica m.c.

    2002-01-01

    It has been 15 years since the original presentation by Frank Halasz at Hypertext'87 on seven issues for the next generation of hypertext systems. These issues are: Search and Query Composites Virtual Structures Computation in/over hypertext network Versioning Collaborative Work Extensibility and Tailorability Since that time, these issues have formed the nucleus of multiple research agendas within the Hypertext community. Befitting this direction-setting role, the issues have been revisited ...

  18. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  19. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  20. Editorial: AABFJ Volume 8, Issue 4 Special Issue in Financial Markets and Financial Instruments

    Directory of Open Access Journals (Sweden)

    Ciorstan Smark

    2014-10-01

    Full Text Available Financial planning in Australia is in a time of change and challenge. Educational standards and regulation are in flux. There is a strong need to move financial planning into a more esteemed professional position as financial planners are not always considered the safest source of advice for people in Asia and the pacific rim when it comes to investing their much needed retirement funds. This Special Issue on Financial Planning and Financial Instruments brings together articles from financial planning, banking, financial markets and retirement policy.

  1. Uranium and nuclear issues

    International Nuclear Information System (INIS)

    1983-01-01

    This seminar focussed on the major issues affecting the future of the entire nuclear fuel cycle. In particular it covered issues bearing on the formation of public policy in relation to the use of uranium as an energy source: economic risk, industrial risks, health effects, site selection, environmental issues, and public acceptance

  2. Issues in Data Labelling

    NARCIS (Netherlands)

    Cowie, Roddy; Cox, Cate; Martin, Jeam-Claude; Batliner, Anton; Heylen, Dirk K.J.; Karpouzis, Kostas; Cowie, Roddy; Pelachaud, Catherine; Petta, Paolo

    2011-01-01

    Labelling emotion databases is not a purely technical matter. It is bound up with theoretical issues. Different issues affect labelling of emotional content, labelling of the signs that convey emotion, and labelling of the relevant context. Linked to these are representational issues, involving time

  3. Comparison and Evaluation of the Performance of Various Types of Neural Networks for Planning Issues Related to Optimal Management of Charging and Discharging Electric Cars in Intelligent Power Grids

    Directory of Open Access Journals (Sweden)

    Arash Moradzaeh

    2018-01-01

    Full Text Available The use of electric vehicles in addition to reducing environmental concerns can play a significant role in reducing the peak and filling the characteristic valleys of the daily network load. In other words, in the context of smart grids, it is possible to improve the battery of electric vehicles by scheduling charging and discharging processes. In this research, the issue of controlling the charge and discharge of electric vehicles was evaluated using a variety of neural models, until the by examining the effect of the growth rate of the penetration level of electric vehicles of the hybrid type that can be connected to the distribution network, the results of the charge management and discharge model of the proposed response are examined. The results indicate that due to increased penetration of these cars is increased the amount of responses to charge and discharge management. In this research, a variety of neural network methods, a neural network method using Multilayer Perceptron Training (MLP, b neural network method using Jordan Education (RNN, c neural network method using training (RBF Was evaluated based on parameters such as reduction of training error, reduction of network testing error, duration of run and number of replications for each one. The final results indicate that electric vehicles can be used as scattered power plants, and can be useful for regulating the frequency and regulation of network voltages and the supply of peak traffic. This also reduces peak charges and incidental costs, which ultimately helps to further network stability. Finally, the charge and discharge management response reflects the fact that intelligent network-based models have the ability to manage the charge and discharge of electric vehicles, and among the models the amount of error reduction training and testing is very favourable for both RNN, MLP.

  4. Strategic Marketing Planning in International Schools

    Science.gov (United States)

    Bunnell, Tristan

    2005-01-01

    Purpose: International schools are a growing class of educational institution. It has been suggested that few schools of this type have a marketing plan whilst research into development planning showed that few had a long-range plan. This paper aims to investigate these issues. Design/methodology/approach: This paper deals with a survey of 32…

  5. Advanced alarm systems: Display and processing issues

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M. [Brookhaven National Lab., Upton, NY (United States); Wachtel, J.; Perensky, J. [US Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Regulatory Research

    1995-05-01

    This paper describes a research program sponsored by the US Nuclear Regulatory Commission to address the human factors engineering (HFE) deficiencies associated with nuclear power plant alarm systems. The overall objective of the study is to develop HFE review guidance for alarm systems. In support of this objective, human performance issues needing additional research were identified. Among the important issues were alarm processing strategies and alarm display techniques. This paper will discuss these issues and briefly describe our current research plan to address them.

  6. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  7. Planning for nuclear emergencies

    International Nuclear Information System (INIS)

    Lakey, J.R.A.

    1989-01-01

    This paper aims to stimulate discussions between nuclear engineers and the radiological protection professions in order to facilitate planning for nuclear emergencies. A brief review is given of the response to nuclear accidents. Studying accidents can lead to prevention, but some effort must be put into emergency response. Such issues as decontamination and decommissioning, socio-economic consequences, education and training for nuclear personnel and exercises and drills, are raised. (UK)

  8. Integration of generic issues

    International Nuclear Information System (INIS)

    Thatcher, D.

    1989-01-01

    The NRC has recognized the need to integrate generic issues (GIs). The GI process includes a number of phases, all of which should recognize the potential for overlap and conflict among related issues. In addition to the issues themselves, other related NRC and industry programs and activities need to be factored into the GI process. Integration has taken place, or is taking place, for a number of GIs. Each case of integration involves a specific set of circumstances and, as a result, the way in which integration proceeds can vary. This paper discusses the integration of issues in the generic issue process and provides a number of examples

  9. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  10. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  11. The text plan concept: contributions to the writing planning process

    Directory of Open Access Journals (Sweden)

    Ana Lúcia Tinoco Cabral

    2013-12-01

    Full Text Available Students - at different levels, ranging from early grades up to PhD - face problems both on comprehension and text production. This paper focuses on the text plan concept according to the DTA (Discourse Text Analysis approach, i.e., a principle of organization that allows students to put into practice the production intention as well as to arrange text information while producing; being responsible for the text compositional structure (Adam, 2008. The study analyzes the relation between text plan and the writing planning process, in which the first one provides the second with theoretical support. In order to develop such research, the study covers some issues related to the reading skill, analyzes an argumentative text as per its textual plan, and presents some reflections on the writing process, focusing on the relation between textual plan and the writing planning process.

  12. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  13. Career Education Models. Trends and Issues Alert.

    Science.gov (United States)

    Brown, Bettina Lankard

    The evolution of the workplace has required changes in the guidance and counseling practices of career education (CE). Basic elements of CE strategies for enhancing students' career awareness, exploration, and planning are still in place, but contemporary issues such as life-work balance, involuntary career transitions, and mentoring have led to…

  14. Special Issue: Competencies from the Individual's Viewpoint.

    Science.gov (United States)

    Career Planning and Adult Development Journal, 2003

    2003-01-01

    Ten articles in this special issue deal with competencies and how their use is revolutionizing human resource management and the work of career practitioners. Topics include competency technology, models, and mapping; behavioral interviewing; talent management; emotional intelligence; succession planning; and lifelong learning. (JOW)

  15. Communication Planning.

    Science.gov (United States)

    Development Communication Report, 1978

    1978-01-01

    Communication planning in developing countries is discussed in individual articles on theory, knowledge production and utilization, planning at the regional level, software, and rural development. A nutrition education project and three experiments in developing educational materials with feedback from villagers in Africa are described in the…

  16. Conference Planning.

    Science.gov (United States)

    Carter, Richard

    1982-01-01

    Presents an overview of the management planning technique known as Break Even Analysis and outlines its use as a tool in financial planning for organizations intending to conduct or sponsor a conference, seminar, or workshop. Three figures illustrating Break Even Analysis concepts and a Break Even Analysis worksheet are included. (JL)

  17. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  18. Human missions to Mars: issues and challenges

    Science.gov (United States)

    Race, M.; Kminek, G.

    Recent announcements of the planned future human exploration of Mars by both European and US space agencies have raised a host of questions and challenges that must be addressed in advance of long-duration human missions. While detailed mission planning is a long way off, numerous issues can already be identified in the broad context of planetary protection. In this session, a panel of experts will provide brief overviews of the types of challenges ahead, such as the protection of the martian environment; the integration of human and robotic mission elements and operations; precursor scientific information necessary to plan human missions; development and use of nuclear and other technologies for the protection and support of astronauts during the mission; protection of Earth upon return; and societal and ethical questions about human exploration. The session has been designed to encourage and incorporate audience participation in the discussion about the issues and challenges ahead.

  19. Planning Cultures and Histories: Influences on the Evolution of Planning Systems and Spatial Development Patterns

    NARCIS (Netherlands)

    Stead, D.; de Vries, J.; Tasan-Kok, T.

    2015-01-01

    This special issue addresses the influences of planning cultures and histories on the evolution of planning systems and spatial development. As well as providing an international comparative perspective on these issues, the collection of articles also engages in a search for new conceptual

  20. Reliability issues : a Canadian perspective

    International Nuclear Information System (INIS)

    Konow, H.

    2004-01-01

    A Canadian perspective of power reliability issues was presented. Reliability depends on adequacy of supply and a framework for standards. The challenges facing the electric power industry include new demand, plant replacement and exports. It is expected that demand will by 670 TWh by 2020, with 205 TWh coming from new plants. Canada will require an investment of $150 billion to meet this demand and the need is comparable in the United States. As trade grows, the challenge becomes a continental issue and investment in the bi-national transmission grid will be essential. The 5 point plan of the Canadian Electricity Association is to: (1) establish an investment climate to ensure future electricity supply, (2) move government and industry towards smart and effective regulation, (3) work to ensure a sustainable future for the next generation, (4) foster innovation and accelerate skills development, and (5) build on the strengths of an integrated North American system to maximize opportunity for Canadians. The CEA's 7 measures that enhance North American reliability were listed with emphasis on its support for a self-governing international organization for developing and enforcing mandatory reliability standards. CEA also supports the creation of a binational Electric Reliability Organization (ERO) to identify and solve reliability issues in the context of a bi-national grid. tabs., figs

  1. EFRT M-12 Issue Resolution: Solids Washing

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, David L.; Schonewill, Philip P.; Toth, James J.; Huckaby, James L.; Eslinger, Paul W.; Hanson, Brady D.; Kurath, Dean E.; Minette, Michael J.

    2010-01-01

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

  2. Unresolved safety issues summary: aqua book

    International Nuclear Information System (INIS)

    1982-06-01

    The unresolved safety issues summary is designed to provide the management of the Nuclear Regulatory Commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to Congress pursuant to Section 210 of the Energy Reorganization Act of 1974 as amended. This summary utilizes data collected from the Office of Nuclear Reactor Regulation, Office of Nuclear Regulatory Research, and the National Laboratories and is prepared by the Office of Resource Management. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  3. Employee Assistance Program Issues

    Science.gov (United States)

    Gettleman, Alan G.; McGuire, William

    1999-01-01

    Employee Assistance Program (EAP) officers, as well as personnel in other disciplines from eight NASA Centers, attended this breakout session. Ms. Brenda Blair, MA, CEAP, a guest speaker at the conference, also attended as a consultant. Representatives from the NASA Centers introduced themselves and spoke briefly about their programs. In a discussion related to the conference theme on benchmarking, quality control issues within the EAP community and adequate documentation of cases were addressed. Disposition and provision for quality assurance checks for EAP providers in single person offices were also discussed. Ms. Blair presented methods for consulting with other NASA personnel in single person EAP offices as a quality control measure. EAP intervention in critical incidents was discussed. The question of whether EAP assistance is an asset or a potential liability in those situations was addressed. Suggestions were made of topics for future EAP video-teleconference topics. A program on EAP ethics was planned for a September video teleconference. Each person was asked to provide intake forms they use to Mr. Gettleman or Ms. Blair. Ms. Blair said she would review the forms to ensure that adequate notification is provided to the client for confidentiality. She would also review them to ensure they have adequate limits of confidentiality--a topic for future video teleconferencing. Mr. Gettleman described the NASA initiative to reduce stresses in the workplace, and the activities of an ad-hoc EAP group that will make recommendations to NASA senior management. Alternative training methods were discussed for reaching target audiences such as employees at risk, supervisors, and others. Pfc. David A. Pendleton, Victim Assistance Coordinator, U.S. Capitol Police. U.S. House of Representatives made a special presentation. Pfc. Pendleton was on duty during the tragic shooting of two Federal guards at the U.S. Capitol. He related the events immediately after the incident. He

  4. Current issues and actions

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the progress that has been made toward achieving full regulatory compliance at the Hanford Site. Ongoing compliance self-assessments, implementation of the Tri-Party Agreement, and public meetings continue to identify environmental compliance issues. These issues are discussed openly with the regulatory agencies and with the public to ensure that all environmental compliance issues are addressed.

  5. Current issues and actions

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the progress that has been made toward achieving full regulatory compliance at the Hanford Site. Ongoing compliance self-assessments, implementation of the Tri-Party Agreement, and public meetings continue to identify environmental compliance issues. These issues are discussed openly with the regulatory agencies and with the public to ensure that all environmental compliance issues are addressed

  6. Environmental issues and wastes

    International Nuclear Information System (INIS)

    Mitamura, Hisayoshi; Banba, Tsunetaka; Maeda, Toshikatsu; Ishiyama, Takashi

    1999-08-01

    All countries in the world are concerned about environmental issues because of their global effects. Developed industrial nations are also confronted with waste issues accompanied by mass production, mass consumption, and mass dump. We have reviewed books and reports to obtain a preliminary knowledge and to understand the trend of technology development before we start R and D for 'environmental monitoring, and environmental remediation and protection'. We lay great emphasis on municipal and industrial wastes in environmental issues and summarize the history of the earth, innovative environmental approaches in advanced nations, waste issues in Japan, and examples of technology development for environmental remediation and protection. (author)

  7. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  8. End of Life Issues

    Science.gov (United States)

    Planning for the end of life can be difficult. But by deciding what end-of-life care best suits your needs when you are healthy, you can ... right choices when the time comes. End-of-life planning usually includes making choices about the following: ...

  9. Marketing plan

    OpenAIRE

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  10. Ontological Planning

    Directory of Open Access Journals (Sweden)

    Ahmet Alkan

    2017-12-01

    • Is it possible to redefine ontology within the hierarchical structure of planning? We are going to seek answers to some of these questions within the limited scope of this paper and we are going to offer the rest for discussion by just asking them. In light of these assessments, drawing attention, based on ontological knowledge relying on the wholeness of universe, to the question, on macro level planning, of whether or not the ontological realities of man, energy and movements of thinking can provide macro data for planning on a universal level as important factors affecting mankind will be one of the limited objectives of the paper.

  11. Planning ahead

    Energy Technology Data Exchange (ETDEWEB)

    Davies, J. [Mintec Inc. (US)

    2004-09-01

    The paper presents a state-of-the-art mine planning program that facilitates data storage and provides easy access to essential mine information. MineSight from Mintec, Inc., and the addition MineSight 3D provide a powerful tool used by major coal companies worldwide, offering modelling of different deposit types and complete planning tools including advanced surface/surface and solid/surface intersection routines. The new MineSight Operations addition helps to streamline the planning process and store raw blasthole data (in acQuire) and essential cut attribute information. 12 figs.

  12. Socioeconomic Site Study Plan: Draft

    International Nuclear Information System (INIS)

    1987-07-01

    Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs

  13. Tools for Supporting Distributed Agile Project Planning

    Science.gov (United States)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  14. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  15. Navigating "Thorny" Issues

    Science.gov (United States)

    Hutchinson, Kashema; Gilbert, Aderinsola; Malyukova, Anna

    2016-01-01

    In their article "Mindfulness and discussing 'thorny' issues in the classroom" Konstantinos Alexakos et al. ("Cult Stud Sci Educ," 2016. doi: 10.1007/s11422-015-9718-0) describe "thorny" issues as "difficult topics to discuss because they are more personal to some perhaps even cause pain and violence." As…

  16. Poverty + Hunger = Global Issues.

    Science.gov (United States)

    Schwartz, Richard H.

    1983-01-01

    Geography teachers can use mathematics to teach fourth, fifth, and sixth grade students about critical global issues. Five sample problems concerning population, poverty, waste, the arms race, and hunger are presented. The global issue related to each problem is discussed, and the solution and mathematical skill are provided. (RM)

  17. Nuclear safety - Topical issues

    International Nuclear Information System (INIS)

    1995-01-01

    The following topical issues related to nuclear safety are discussed: steam generators; maintenance strategies; control rod drive nozzle cracks; core shrouds cracks; sump strainer blockage; fire protection; computer software important for safety; safety during shutdown; operational safety experience; external hazards and other site related issues. 5 figs, 5 tabs

  18. 19 (Special Issue)

    African Journals Online (AJOL)

    mwakagugu

    19 (Special Issue). Tanzania Dental Journal 2017. 1. PRESIDENTS SPEECH AT THE OPENING CEREMONY OF THE TANZANIA DENTAL. ASSOCIATION 31ST SCIENTIFIC CONFERENCE AND .... awareness on oral health issues, high tooth decay, gum diseases and predominant tooth extraction as consistently reported ...

  19. Planning Meals

    Science.gov (United States)

    ... Take the guess work out of what to eat using our tips, recipes and sample meals. Featured Book: Ultimate Diabetes Meal Planner includes weekly plans for breakfast, lunch, dinner, and snacks, along with detailed recipes that make ...

  20. 3D treatment planning systems.

    Science.gov (United States)

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  1. Special issue : transport in a post-carbon society

    Science.gov (United States)

    2009-04-01

    This special issue of World Transport Policy & Practice is an outcome of the conference Planning for the Carbon Neutral World: Challenges for Cities and Regions, held 15-18 May 2008 in Salzburg, Austria. The conference, organised by SCUPAD Salzbu...

  2. Some Issues on Management Information System Course Teaching

    OpenAIRE

    Chen, Dingquan

    2008-01-01

    This paper discuses the following issues about Management Information System course for the major of information management & Information System: Teaching Object, the difference between Information System Analysis and Design course, teaching content, and experiment plan.

  3. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  4. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  5. business plan

    OpenAIRE

    Luzan, Dmitrij

    2009-01-01

    My thesis is dedicated to the business plan of the gastronomic facility. The thesis describes foundation of the company, analyses demand for the gastronomic services. The financial plan is being presented as well. The thesis includes the analysis of the company's environment, suppliers and customers. SWOT analysis, net present value analysis, index of the net present value and other ratio indexes are the parts of this thesis.

  6. Volume 8 Issue 2

    Directory of Open Access Journals (Sweden)

    Karen Nelson

    2017-06-01

    Full Text Available This issue is our third Students, Transitions, Achievement, Retention and Success (STARS Conference special issue held in July this year in Adelaide, Australia.   As is customary, this issue of the journal publishes the top research papers selected via a peer review process and the top Emerging Initiatives selected by the Conference Committee.    We are delighted to feature in this special  issue —Reflections on Student Persistence—prepared by Advisory Board member Professor Vincent Tinto, Distinguished University Professor Emeritus at Syracuse University, USA.  Vincent is a long-time friend and supporter of STARS and its predecessor FYHE Conferences and Journal.   In his article, Vincent explores the case for motivation to be considered as a significant aspect of the tertiary student psyche by drawing on theoretical frameworks, research and practical experiences related to the issue.

  7. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  8. Unresolved safety issues summary: aqua book

    International Nuclear Information System (INIS)

    1983-06-01

    The unresolved safety issues summary is designed to provide the management of the nuclear regulatory commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to congress pursuant to section 210 of the Energy Reorganization Act of 1974 as amended. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The schedule for implementation will not normally be included in the task action plan(s) for the resolution of a USI since the nature and extent of the activities necessary to accomplish the implementation cannot normally be reasonably determined prior to the determination of a technical resolution. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  9. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  10. The big issue: environment and large dams

    International Nuclear Information System (INIS)

    Rogers, Peter

    1999-01-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  11. The big issue: environment and large dams

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Peter [Harvard Univ. (United States)

    1999-09-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  12. Issues related to cooperative implementation mechanisms

    International Nuclear Information System (INIS)

    1998-01-01

    This note by the secretariat seeks to focus discussions on some key issues regarding the design and functioning of the three new mechanisms, such as issues concerning mandates, cross-cutting as well as issues concerning individual mechanisms. The note addresses each mechanism separately in view of different origins, approaches, participants and possible applications. Reference is, however, made to similarities among the mechanisms, in particular where coordination of work on methodological and institutional issues and inter-institutional collaboration are concerned. The note suggests, in its concluding part, elements of a work programme up to and, to some extent, beyond COP 4. It draws upon the views submitted by Parties (document FCCC/SB/1998/MISC.1), contains reflections by the secretariat and builds on its consultations with other organizations having activities, under way or planned, that could contribute to the design or operation of the mechanisms. (au)

  13. A model for effective intergovernmental planning

    International Nuclear Information System (INIS)

    Moore, R.C.

    1991-01-01

    Effective intergovernmental planning processes are essential to the resolution of potential affects created by federal projects. Intergovernmental planning for the proposed Yucca Mountain High-level Nuclear Waste Repository has not been effective to date. In this paper, two successful planning efforts are described. The common elements of these processes are analyzed to provide a model that can be used for the resolution of impacts from other projects. Management authorities of the entities involved should establish a working group to conduct the intergovernmental planning. The parties must identify issues that can be resolved through intergovernmental planning. Clear management authority and direction to the staff participating the planning process is essential. Issues which cannot be resolved should not be included in the goals of the working group. Funding to support the planning process is essential

  14. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1987-05-01

    This document presents a plan for seismic research to be performed by the Structural and Seismic Engineering Branch in the Office of Nuclear Regulatory Research. The plan describes the regulatory needs and related research necessary to address the following issues: uncertainties in seismic hazard, earthquakes larger than the design basis, seismic vulnerabilities, shifts in building frequency, piping design, and the adequacy of current criteria and methods. In addition to presenting current and proposed research within the NRC, the plan discusses research sponsored by other domestic and foreign sources

  15. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  16. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-11-24

    Nov 24, 2017 ... Keywords Active system, strategic planning, condition of open management, ... Journal of Fundamental and Applied Sciences is licensed under a .... operating influences - intellectual (а1), executive (а2) and observant (а3).

  17. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-10-17

    Oct 17, 2017 ... ... scheduling; domain tr. Author Correspondence, e-mail: .... In the literature, there is also research on optimization capacity planning. When considering ..... on the Practice and Theory of Timetabling, 2006, pp. 167-180.

  18. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-11-24

    Nov 24, 2017 ... aesthetic factors to be guidance of rail transit planning in tourist attractions. We begin by defining ... Some suggested ecosystem impact from transportation infrastructure ... recommended to manage landscape around railway.

  19. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... development plans of the country based on comprehensive studies of ... works, the people who do those works, money, equipment and facilities, ..... organizational behavior structure, and the correspondence between the ...

  20. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... The coordinating organizations working in disaster management ... existing structure, plans and resources to a scenario designed for their country ... System Research Based on Digital Micro-mirror Device Transform, (DMD) ...

  1. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-05-16

    May 16, 2018 ... The purpose for this study was planned to survey the relationship between e ... Consumer's satisfaction can likewise .... This method was effective ways to be use in this research because data ... Journal of Services Marketing.

  2. Research Article Special Issue

    African Journals Online (AJOL)

    2018-01-15

    Jan 15, 2018 ... Badak Campus, 21300 Kuala Nerus, Terengganu, Malaysia. 2 .... of three sampling locations ..... Science and Business Media, 2005 ... Saudi A S, Rizman Z I, Gasim M B, Hassan A R. Assessment of river plan changes in.

  3. 19 (Special Issue)

    African Journals Online (AJOL)

    mwakagugu

    steering the development and .... the development of master plans of a few private medical ... for the international or regional market? 2. Provision of ... of our colleagues were opening in big cities, especially in .... Collaboration and Networking:.

  4. Book Review: CFP Board Financial Planning Competency Handbook

    Directory of Open Access Journals (Sweden)

    Jorge Ruiz-Menjivar

    2015-07-01

    Full Text Available The CFP Board Financial Planning Competency Handbook (2013 is reviewed as a resource that extends beyond financial planning to other helping professionals who work with money related issues.

  5. Planning Study Hospital, Cape Town The Hospital Information at ...

    African Journals Online (AJOL)

    Tile HOspital Information Plan- ning Study ... Hospital, and based on. the Business Systems Plan- ... technology can be of considerable benefit in dealing with these issues. .... coherenr, flexible information systems with a minimum of data.

  6. Special Issue to publish

    OpenAIRE

    Kllogjeri, Pellumb

    2015-01-01

    SciencePG has offered an email poster to help collect papers for our Special Issue and I have uploaded it for you. Please visit http://www.sciencepublishinggroup.com/specialissue/149002  to see our Special Issue announcement. Now, you can do the followings to personally contribute and promote our Special Issue:1. Submit your paper related to the topics of interest 2. Upload it to your personal websites.3. Upload it to the public websites of some universities and academic institutions...

  7. New reproductive genetics: political issues.

    Science.gov (United States)

    Hanft, R S

    1993-09-01

    For the last 12 years, the reproductive policies of the executive branch of US government have been dominated by the anti-abortion, right-to-life position. Since coming to office, the Clinton administration has lifted the gag rule on abortion advice, removed the barrier to fetal tissue research, encouraged application for premarket approval of RU-486, and approved the female condom. The new administration's future policy and action taken on abortion, new drugs (e.g., RU-486), fetal tissue research, and payments for prenatal diagnosis, prenatal therapy, and abortion are outlined. President Clinton clearly has enunciated a pro-choice stance on abortion, and rescinded current regulations restricting abortion. The gag rule was lifted on January 22, 1993. The French manufacturer of RU-486 has not applied to the Food and Drug Administration for premarket approval out of concern for the reaction of both the federal executive and a potential boycott of other products by right-to-life, anti-abortion groups. New factors may encourage the manufacturer to apply for approval. The US Public Health Service can be expected to expand information and prevention activities to slow the spread of AIDS and to increase efforts for family planning to reduce teenage pregnancy. Fetal tissue research has contributed to such breakthroughs as prenatal diagnosis, in vitro surgery, and transplantation. The ban on the research was lifted early in the new administration. Aside from the issue of financial coverage under insurance plans to pay for prenatal diagnosis, prenatal therapy, and abortion, prenatal therapy raises a potential new conflict between the mother and her fetus. It raises issues related to equality for the disabled, particularly after life outside the womb is possible. In 2 years there could be a reversal of power in the Congress, again raising the specter of efforts to restrict developments in the field of reproductive biology.

  8. Worldwide overview of nuclear submarine decommissioning plans and issues

    International Nuclear Information System (INIS)

    Oelgaard, P.L.

    1995-06-01

    The number of nuclear propelled vessels that have reached the end of their useful life, is increasing. This raises the question of what to do with these vessels. In this paper the order of magnitude of the problem is first discussed, i.e. the number of nuclear ships built and the number already taken out of service. Next the problems of the first stages of decommissioning are discussed, i.e. the removal of the fuel and the preparation of the reactor parts for final disposal, including the amounts of radioactivity involved. Thirdly, the various methods of final disposal are considered, sea disposal, shallow land burial and deep land burial. Finally, the risks involved in nuclear submarine decommissioning are briefly discussed. (au)

  9. Issues in the Planning of a Multilingual Explanatory Dictionary of ...

    African Journals Online (AJOL)

    He advocates a sociolinguistic approach (d. Cluver 1989: 9) .... Mathematics, Engineering, Linguistics, Philosophy, Psychology and the like, is the lack ... Pure and Applied Chemistry), that have to be considered when assigning ter- minological ...

  10. 20 CFR 628.420 - Job training plan.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  11. Understanding Pregnancy and Birth Issues

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Understanding Pregnancy and Birth Issues Past Issues / Winter 2008 Table ... turn Javascript on. What is a High-Risk Pregnancy? All pregnancies involve a certain degree of risk ...

  12. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  13. Special issue: Plasma Conversion

    NARCIS (Netherlands)

    Nozaki, T.; Bogaerts, A.; Tu, X.; van de Sanden, M. C. M.

    2017-01-01

    With growing concern of energy and environmental issues, the combination of plasma and heterogeneous catalysts receives special attention in greenhouse gas conversion, nitrogen fixation and hydrocarbon chemistry. Plasma gas conversion driven by renewable electricity is particularly important for the

  14. Medical Issues: Nutrition

    Science.gov (United States)

    ... support & care > living with sma > medical issues > nutrition Nutrition Good nutrition is essential to health and growth. ... must make decisions based on their own needs. Nutrition Considerations Since we are still waiting for clinical ...

  15. Strategic Issues for Training.

    Science.gov (United States)

    Pollitt, David, Ed.

    1999-01-01

    Contains precis of 18 articles on strategic management issues, including management development, on-the-job training, corporate scholarship, educational technology, coaching, investing in intellectual capital, and knowledge management. (SK)

  16. Pregnancy and Reproductive Issues

    Science.gov (United States)

    ... Health Pregnancy Share this page Facebook Twitter Email Pregnancy and Reproductive Issues Tahirah Diagnosed in 2003 Pregnancy ... in control groups without the disease. Effects of pregnancy on MS Before 1950, most women with MS ...

  17. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-05-16

    May 16, 2018 ... This paper discusses the issues and challenges faced during .... provision of this AELF's office is costly and need permission from the university's management. .... This is to deduct weeks for the assignment and tests because ...

  18. Research Article Special Issue

    African Journals Online (AJOL)

    2017-02-15

    Feb 15, 2017 ... One of the important issues in the field of human education is the method of ... Encouragement and punishment method in Islamic management has been ... Concept of education refers to the cultivating human talent, this.

  19. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-22

    Mar 22, 2018 ... rameter of computation time and convergence rate. The two scheme have shown ... matrix and its inversion repeatedly for every iteration. This issue causes long ..... Some New Findings on Gauss-Seidel. Technique for Load ...

  20. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-02-01

    Feb 1, 2018 ... The main goal of this article is to analyze methodological issues in .... methodology and theory and historiology (theory of historic process) whose goal is to .... internal branches of sociology and interdisciplinary links of ...

  1. Respiratory Issues in OI

    Science.gov (United States)

    Respiratory Issues in Osteogenesis Imperfecta \\ Introduction The respiratory system’s job is to bring oxygen into the body and remove carbon dioxide, the waste product of breathing. Because oxygen is the fuel ...

  2. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-04-16

    Apr 16, 2018 ... The dimensions to business process strategy factors are .... Investigation pains directed at further exploring these issues are very ... relationship management, material flow management, corporate culture in SMEs' Customer.

  3. Common Mental Health Issues

    Science.gov (United States)

    Stock, Susan R.; Levine, Heidi

    2016-01-01

    This chapter provides an overview of common student mental health issues and approaches for student affairs practitioners who are working with students with mental illness, and ways to support the overall mental health of students on campus.

  4. Fusion Canada issue 11

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-06-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on operation at Tokamak de Varennes, CRITIC irradiations at AECL, Tritium systems at TFTR, physics contribution at ITER. 4 figs.

  5. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-11-10

    Nov 10, 2017 ... 1Faculty of Sports Science and Coaching, Universiti Pendidikan ... face obesity issues because of several factors such as changes in diet intake, lifestyle, physical ...... and its implications for policy and intervention strategies.

  6. Fusion Canada issue 23

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    A short bulletin from the National Fusion Program highlighting in this issue TdeV tokamak updates, fusion research in Korea, CCFM program review, TdeV divertor plasma, and CFFTP program review. 4 figs.

  7. Sleep Issues and Sundowning

    Science.gov (United States)

    ... Caregiving Middle-Stage Caregiving Late-Stage Caregiving Behaviors Aggression & Anger Anxiety & Agitation Depression Hallucinations Memory Loss & Confusion Repetition Sleep Issues & Sundowning Suspicion & Delusions Wandering Abuse Start Here What You Need to Know Online ...

  8. Fusion Canada issue 27

    International Nuclear Information System (INIS)

    1995-03-01

    A short bulletin from the National Fusion Program highlighting in this issue ITER reactor siting, a major upgrade for TdeV tokamak, Ceramic Breeders: new tritium mapping technique and Joint Fusion Symposium. 2 figs

  9. Research Article Special Issue

    African Journals Online (AJOL)

    2017-02-15

    Feb 15, 2017 ... Research Article. Special Issue ... In myriad studies implemented, the quality of life has been defined in different ways among which the .... service and trading users in living area. ... market, bakery, barber shop, restaurant, etc.

  10. Environmental Compliance Issue Coordination

    Science.gov (United States)

    An order to establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance

  11. Fusion Canada issue 20

    International Nuclear Information System (INIS)

    1993-03-01

    Fusion Canada's publication of the National Fusion Program. Included in this issue is the CFFTP Industrial Impact Study, CCFM/TdeV Update:helium pumping, research funds, and deuterium in beryllium - high temperature behaviour. 3 figs

  12. Issues in Electronic Publishing.

    Science.gov (United States)

    Meadow, Charles T.

    1997-01-01

    Discusses issues related to electronic publishing. Topics include writing; reading; production, distribution, and commerce; copyright and ownership of intellectual property; archival storage; technical obsolescence; control of content; equality of access; and cultural changes. (Author/LRW)

  13. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... Assistant professor, Khorasgan Branch, Islamic Azad University, Isfahan, Iran ... Discussing the issue of knowledge leads inevitably to the problem of beliefs because .... the level of definition from truth at the level of examples.

  14. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-22

    Mar 22, 2018 ... Voltage decay is an important issue in the power system community. ... of voltage profile, the total real power loss in the system is also determined to ..... Kumar A. Optimal placement of DG in radial distribution systems based.

  15. Male Fertility Issues

    Science.gov (United States)

    Fertility issues are common in boys and men getting cancer treatment. Fertility preservation options include sperm banking, testicular shielding, testicular sperm extraction (TESE), and testicular tissue freezing. Support and clinical trials are listed.

  16. Fusion Canada issue 23

    International Nuclear Information System (INIS)

    1994-01-01

    A short bulletin from the National Fusion Program highlighting in this issue TdeV tokamak updates, fusion research in Korea, CCFM program review, TdeV divertor plasma, and CFFTP program review. 4 figs

  17. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-02-24

    Feb 24, 2018 ... ABSTRACT. Electronic Records and Information Management (e-RIM) framework is paramount for ..... RIM issues and problems that led to information crisis. On the other .... Malaysia: A case study in one government agency”.

  18. Research Article Special Issue

    African Journals Online (AJOL)

    2016-07-16

    Jul 16, 2016 ... investigated and analyzed from various library and documentary ... It is therefore evident that applied research on issues related to ...... [29] Cutter-SL., Burton-CG., Emrich-CT., Disaster resilience indicators for benchmarking.

  19. Fusion Canada issue 10

    International Nuclear Information System (INIS)

    1990-02-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on Fusion Materials Research, ITER physics research, fusion performance record at JET, and design options for reactor building. 4 figs

  20. Fusion Canada issue 6

    International Nuclear Information System (INIS)

    1989-02-01

    A short bulletin from the National Fusion Program. Included in this issue is a funding report for CFFTP, a technical update for Tokamak de Varennes and a network for university research by the National Fusion Program. 4 figs

  1. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-04-18

    Apr 18, 2018 ... selectivity of possible lead compounds prior to clinical trials and ... These computational algorithms had resolved previous issues and .... In similarity with the spatial space degree of the universe, these descriptors are running ...

  2. Continuity of Operations (COOP) in the Executive Branch: Background and Issues for Congress

    National Research Council Canada - National Science Library

    Petersen, R. E

    2004-01-01

    ... to continuity of operations (COOP) issues. COOP planning is a segment of federal government contingency planning that refers to the internal effort of an organization, such as a branch of government, department, or office, to assure...

  3. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  4. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  5. Current Issues in Tourism

    OpenAIRE

    Xu, Shi; Martinez, Larry R.; Hubert, Van Hoof; Tews, Michael; Torres, Leonardo; Farfán, Karina

    2015-01-01

    Ram (2015 Ram, Y. (2015). Hostility or hospitality? A review on violence, bullying and sexual harassment in the tourism and hospitality industry. Current Issues in Tourism. doi:10.1080/13683500.2015.1064364 [Taylor & Francis Online], [Google Scholar] . Hostility or hospitality? A review on violence, bullying and sexual harassment in the tourism and hospitality industry. Current Issues in Tourism. doi:10.1080/13683500.2015.1064364) posits that violence and harassment are areas of concern...

  6. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  7. Urban sustainability through strategic planning: A case of metropolitan planning in Khulna city, Bangladesh

    Directory of Open Access Journals (Sweden)

    Md. Ashiq Ur Rahman

    2016-06-01

    Full Text Available Planning is a crucial element for any development initiative. Planning entails choice making in pursuit of stated goals e.g. improving living conditions for individuals and societies. Planning initiatives are employed within social systems that are governed by institution, and planning intervenes with and may reconfigure these institutions resulting in social change. This paper discusses how urban sustainability can be achieved through strategic action in urban development by analysing the planning process of Khulna city, Bangladesh. This paper reviews different scholarly articles to draw a conceptual framework for identifying the interface of strategic planning, components of strategic action planning and urban sustainability. Based on this conceptual framework this paper identifies the scope of achieving urban sustainability through analysing the current planning practice of Khulna city, Bangladesh. This paper identifies that though the Khulna city plan adopted the approach of strategic planning but it failed to comply with its theoretical notion to achieve the issues related to urban sustainability. Analysis reveals that in terms of social attribute that recognizes the interest of different group of people the exiting planning packages is not sustainable. Similar phenomenon have been observed in terms of recognition of gender and marginalized people in planning, equitable provision of income and employment generation, peoples’ participation in planning and polices for ensuring equitable access to infrastructure services. Therefore the existing planning package of Khulna city failed to achieve the issues of urban sustainability through its adapted strategic planning approach.

  8. IMPAK - 3/2003 issue

    International Nuclear Information System (INIS)

    2003-01-01

    IMPAK is quarterly bulletin of the Department of Environment, Malaysia. In this issue, IMPAK's theme is A Clean Environment for Healthy Living. This theme is also being used by Malaysian Environment Week (MASM), which was celebrated on 21-27 October 2003. IMPAK and MASM chose this theme to instill greater awareness and care for the environment so that all Malaysian will work together to protect their common heritage. Four feature articles are selected to strengthen the theme. The first article is Proper Solid Waste Management for Healthy Living: Importance and Key to Success explain that proper planning and management of solid waste is crucial and the best technical solution for it is public involvement. The second article is Recycling Our Commitment Towards Environmental Conservation' describe the tremendous benefits of recycling from economic and environmental aspects and its impact to save Mother Earth. The third article is From River to Drain (and Back Again) tells the uniqueness of relationship between rivers and local residents leads to the successful of nature waterways restoration. Last article Environmental Reporting: Issues and Challenges Ahead, explains the needs of having environmental report as it becomes reference for future development. In Technical Update section, IMPAK provide info on Biofilters for Hydrogen Sulfide Odour Control

  9. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  10. Institutional Plan, FY1989--FY1994

    International Nuclear Information System (INIS)

    1988-12-01

    This report discusses future plans of the Stanford Linear Accelerator Center. Topics covered are: Laboratory Mission; Special Issues; Laboratory Strategic View; Scientific Program at SLAC; Initiatives; Education and Technology Transfer Programs; Site and Facilities; and Resource Projections. 9 tabs

  11. Airspace Integration Plan for Unmanned Aviation

    National Research Council Canada - National Science Library

    2004-01-01

    The Office of the Secretary of Defense Airspace Integration Plan for Unmanned Aviation outlines the key issues that must be addressed to achieve the goal of safe, routine use of the National Airspace System (NAS...

  12. Energy Strategy and Regional Planning in Croatia

    International Nuclear Information System (INIS)

    Toljan, I.

    1997-01-01

    The paper describes the relationship between energy strategy and regional planning in Croatia, the targets, environmental issues and preconditions to be met for the establishment of a modern energy sector. (author)

  13. Tank 241-AP-104 tank characterization plan

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-11-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Double-Shell Tank (DST) 241-AP-104

  14. Call for another special issue / book

    Science.gov (United States)

    Bostenaru Dan, M.

    2009-04-01

    We would like to continue the series of special issue or maybe edit a book on this topic. To complete the formerly edited special issues we would like to link natural hazards research to cultural heritage research. We see a way of doing this connected to "integrated conservation", which sees the involvment of urban planning in conservation, as well as the (urban) sociology, the integration of the user, the participatism. We further call for investigation of GIS applications for the investigation of natural hazards' impact in this field. We are open for further ideas and wait for you at the Splinter meeting.

  15. Issues related to field testing in tuff

    International Nuclear Information System (INIS)

    Zimmerman, R.M.

    1982-01-01

    This paper has brought out the unique properties of tuffs and related them to needs associated with their use as a host rock for a high level nuclear waste repository. Major issues of temperature, pore water, joints, and depositional patterns have been identified and related responses and impacts outlined in Table 1. Planned experiments have been outlined and their relationships to the rock mechanics issues summarized in Table 2. The conclusions from this paper are: (1) tuff is a complex rock and basic phenomenological understanding is incomplete; and (2) available field test facilities will be used for a series of experiments designed to improve phenomenological understanding and support repository design efforts

  16. Flight Planning

    Science.gov (United States)

    1991-01-01

    Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.

  17. Community Mental Health: Issues for Social Work Practice and Education.

    Science.gov (United States)

    Katz, Arthur J., Ed.

    Articles by social work educators on some of the critical issues in community mental health are presented. Examined are some conceptual and program developments related to coordination, continuity of care, and the use of teams in planning and service delivery for community mental health (Lawrence K. Berg). The issue of civil commitment to and…

  18. Planned place of birth

    DEFF Research Database (Denmark)

    Overgaard, Charlotte; Coxon, Kirstie; Stewart, Mary

    Title Planned place of birth: issues of choice, access and equity. Outline In Northern European countries, giving birth is generally safe for healthy women with uncomplicated pregnancies, and their babies. However, place of birth can affect women’s outcomes and experiences of birth. Whilst tertiary...... countries, maternity care is provided free to women, through public financing of health care; universal access to care is therefore secured. Nevertheless, different models of care exist, and debates about the appropriateness of providing maternity care in different settings take place in both countries...... in Denmark Coxon K et al: Planned place of birth in England: perceptions of accessing obstetric units, midwife led units and home birth amongst women and their partners. How these papers interrelate These papers draw upon recent research in maternity care, undertaken in Denmark and in England. In both...

  19. Particle therapy planning

    International Nuclear Information System (INIS)

    Zink, S.

    1987-01-01

    The Radiation Research Program (RRP) supports a variety of research through grants and contracts. During the last few years, considerable effort has been devoted to treatment planning evaluation in particle, photon and electron radiotherapy. In 1981, RRP issued a request for proposals (RFP) for the evaluation of treatment planning with particle beam radiotherapy - to include protons, heavy ions and neutrons. Contracts were subsequently awarded to four institutions: Massachusetts General Hospital (MGH), University of Texas and M.D. Anderson Hospital (MDAH), the heavy ion project at Lawrence Berkeley Laboratory (LBL) and University of Pennsylvania (UPa). These contracts reached completion December 31, 1986. The work for the contracts was carried out at the individual institutions and guided through a Working Group made up of the Project Officer and Principal Investigators and primary physicians and physicists at each of the participating institutions. This report summarizes the findings of the Working Group and makes recommendations for further research

  20. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  1. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  2. Information Systems Management: an Australian view of the key issues

    Directory of Open Access Journals (Sweden)

    Graham Pervan

    1994-05-01

    Full Text Available Studies investigating the key issues in IS management serve to better understand the concerns of IS managers and help to guide IS researchers in choosing IS management problems worthy of investigation. This paper presents results from a study of the key issues facing the IS managers of Australia's largest 300 organisations which is part of a three-yearly longitudinal study. In order to gain consensus on the relative importance of the key issues, a three-round Delphi method was applied. The results reveal that IS strategic planning continues to be the paramount issue in our industry, as are many issues associated with IS strategic planning, including responsiveness of the IT infrastructure, effective use of the data resource, IS for competitive advantage, and a comprehensive information architecture. A greater emphasis on quality is also revealed in highly rated issues such as effective use of the data resource, data integrity and quality assurance, and the quality of software development

  3. Planning Curriculum in International Education.

    Science.gov (United States)

    Durtka, Sharon; Dye, Alex; Freund, Judy; Harris, Jay; Kline, Julie; LeBreck, Carol; Reimbold, Rebecca; Tabachnick, Robert; Tantala, Renee; Wagler, Mark

    International education begins at home, in the very communities and environments most familiar to students. A student does not need to travel outside U.S. borders to meet the peoples or understand the issues of the global village. This planning guide shows how curriculum in all subject areas encompasses global challenges, global cultures, and…

  4. Mega-Planning in Population

    Science.gov (United States)

    Clark, Sarah C.; Murray, Margo

    2005-01-01

    Clark and Murray examine the six Critical Performance Factors for Mega planning in an example drawn from the five-year history of the population program of a major west coast philanthropy. In this article, the authors describe the salience and scope of the population issue as it is relates to other global trends; the steps the foundation took to…

  5. Wind farms and planning

    International Nuclear Information System (INIS)

    Arkesteijn, L.; Havinga, R.; Benner, J.H.B.

    1992-01-01

    The siting of wind farms is becoming an increasingly important issue in the Netherlands. This paper gives an overview of the current situation concerning the planning of wind farms. We will pay attention to: Wind energy in official Dutch planning policy. To select the optimal sites, the government has made an administrative agreement with the 7 windy provinces. Nevertheless, wind energy is still fighting for a rightful position in physical planning policy. Some examples will illustrate this. Studies on siting and siting problems in the Netherlands. In order to gain more insight into aspects of wind farming several studies have been executed. In this paper special attention will be paid to the results of a study on the potential impact of large windturbine clusters on an existing agricutural area. Experiences with siting of wind farms in the Netherlands. Based on experiences with the planning and realization of farms, this paper gives the main problems. In the final part of the paper we present some general conclusions. Generally speaking, the knowledge is available for selecting optimal sites in the Netherlands. The basic problems for wind farming nowadays seem to be the visual impact and actually obtaining the ground. Nevertheless, there do seem to be enough sites for realizing the goals in the Netherlands. (au)

  6. YOUNG INVESTIGATOR SPECIAL ISSUE (Editorial

    Directory of Open Access Journals (Sweden)

    Eric Eils

    2004-11-01

    , knowledge and capability in the new generation of scientists in the field of sports science. Furthermore, the high motivation seen in these contributors has convinced us that we were right in the direction that the JSSM has taken in this context. We are very happy that we achieved our goal in a very short time. The JSSM Young Investigator Special Issue became ready one month before the planned schedule. Many expert referees wrote us and offered their help. Many other referees accepted our revision request immediately despite their busy schedule. The support of the supervisors was also substantial. At this point, we would like to thank all contributors to this first issue of the Young Investigator Special of the JSSM. In the future, we hope that we can attract even more participants to share their knowledge with us, to write up their own work and to increase their motivation and confidence. Finally, we hope that the readers will accept this Young Investigator Issue as a scientific source for research. Enjoy it!

  7. Planning for IPv6

    CERN Document Server

    Hagen, Silvia

    2011-01-01

    It's official: with IPv4 network addresses close to depletion, moving to IPv6 is now business critical. This concise book helps you plan for IPv6 integration by providing a high-level overview of the technical-and nontechnical-steps involved. Many of the challenges for your enterprise are on the organizational level, and solutions differ from company to company. IPv6 Essentials author Silvia Hagen, a protocol analysis and directory service expert who's worked with IPv6 international groups and forums for 10 years, supplies answers to the issues most frequently discussed by the clients she co

  8. Food control concept: Food safety/ingestion issues

    International Nuclear Information System (INIS)

    Armstrong, B.

    1995-01-01

    This talk outlines the issues in food safety/ingestion in the case of radiation accidents at nuclear power plants and how emergency preparedness plans can/should be tailored. The major topics are as follows: In Washington: food safety/ingestion issues exist at transition between response and regulatory worlds; agricultural concerns; customer concerns; Three Mile Island: detailed maps; development of response procedures; development of tools; legal issues

  9. Critical Issues in the Lives of Children and Youth Who Are Deafblind

    Science.gov (United States)

    Nelson, Catherine; Bruce, Susan M.

    2016-01-01

    The coeditors of an "American Annals of the Deaf" special issue on deafblindness introduce readers to critical issues surrounding children and youth who are deafblind. These issues--early identification, communication, social-emotional needs, family and multicultural issues, universal design and assistive technology, transition planning,…

  10. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  11. Ceramics radiation effects issues for ITER

    International Nuclear Information System (INIS)

    Zinkle, S.J.

    1993-01-01

    The key radiation effects issues associated with the successful operation of ceramic materials in components of the planned International Thermonuclear Experimental Reactor (ITER) are discussed. Radiation-induced volume changes and degradation of the mechanical properties should not be a serious issue for the fluences planned for ITER. On the other hand, radiation-induced electrical degradation effects may severely limit the allowable exposure of ceramic insulators. Degradation of the loss tangent and thermal conductivity may also restrict the location of some components such as ICRH feedthrough insulators to positions far away from the first wall. In-situ measurements suggest that the degradation of physical properties in ceramics during irradiation is greater than that measured in postirradiation tests. Additional in-situ data during neutron irradiation are needed before engineering designs for ITER can be finalized

  12. Privatization and Financial Market Development: Theoretical Issues

    OpenAIRE

    Gabriella Chiesa; Giovanna Nicodano

    2003-01-01

    Stock market capitalization in developed countries grew while massive privatization plans were in progress. It is however possible that stock market development would have occurred anyway. Below we identify features that are specific to share-issue privatizations (SIPs) and should a priori impact on market liquidity and market size. A positive correlation between such features and market development in a cross section of countries would support the claim that certain types of SIPs contribute ...

  13. U.S.-China Relations: Policy Issues

    Science.gov (United States)

    2010-03-12

    China Relations: Policy Issues Congressional Research Service 8 Center; the U.S.-China Energy Efficiency Action Plan; and the U.S.-China Energy...January 25, 2010. 28 Liu Shengjun, “How to Better Use Forex Reserves,” China Daily, January 13, 2010. 29 Paul R. La Monica, “China Still Likes Us…For...or commercialization of carbon capture and sequestration technology, improve energy efficiency , or renewable energy sources. H.R. 2454 Waxman

  14. Transition issues in an unbundled residential market

    International Nuclear Information System (INIS)

    Brett, J.D.

    1996-01-01

    Aspects of an unbundled residential gas market were discussed, among them (1) the role of a local distribution company (LDC), (2) the context and the issues, (3) the customers'needs and desires, (4) long term planning responsibility, (5) consumer protection and dealing with abuses, (6) the obligation to serve, (7) the bad credit risk customer, (8) billing, credit and collection, and (9) metering and CIS

  15. The railroad perspective: Issues behind the issues

    International Nuclear Information System (INIS)

    Furber, C.P.; Brobst, W.A.

    1986-01-01

    Rail transportation is a vital segment of DOE's spent fuel program. Most of the shipments from reactors to a repository or to a Monitored Retrievable Storage facility will be by rail, and essentially all of the shipments from an MRS to a repository. Casks must move economically and efficiently, while at the same time providing adequate safety to the public and transport workers, and meeting the legal/institutional constraints. Shippers are faced with the problem of procuring transportation services in a safe manner at a reasonable cost, trying to balance freight charges against cask inventory costs. Carriers are cautious about accepting potentially high hazard materials in routine service, and are worried about uninsured losses in case of accidents. Both shippers and carriers operate under different scheduling and operational criteria. Technical and institutional constraints add to the complexity of the operation. Standardization of shipping casks and rail car design will ease the resolution of the complex problems now existent. This paper discusses the economic, safety, operational, and legal issues surrounding rail transportation

  16. Regulatory and legal issues

    International Nuclear Information System (INIS)

    Raisler, K.M.; Gregory, A.M.

    1999-01-01

    This chapter focuses on the legal issues relating to the derivatives market in the USA, and analyses the Commodity Futures Trading Commission's (CFTCs) information on swaps and hybrid instruments. The law and regulation in the USA is examined and the jurisdictional reach of the Securities and Exchange Commission (SEC), CFTC, and the Commodity Exchange Act (CEA) is described. The forward contract exclusion and the case of Transnor (Bermuda) Ltd. versus BP North America Petroleum, state laws, swap policy statement issues by the CFTC, the Futures Trading Practices Act of 1992, swaps exemptions, the exemption of hybrid instruments from the CEA, and energy contract exemption are discussed. Enforceability, derivatives, and issues before regulators are considered

  17. Energy and environmental issues

    International Nuclear Information System (INIS)

    Skea, Jim

    1993-01-01

    This paper provides an overview of the current energy-environmental issues. Firstly, the environmental problems associated with energy production and use are briefly described. Secondly, the paper reviews the availability of technological solutions to environmental problems, focussing particularly on atmospheric emission control. Finally, it moves on to look at recent policy developments in some parts of the world. Since the paper is written from the perspective of an industrialized country, emerging policy issues in Europe, Japan, and North America receive the greatest attention, with a particular focus on Europe where greenhouse gases and the proposed carbon tax have received a particularly high priority. The paper concludes with a discussion of some of the issues arising from the 1992 UNCED (UN Conference on Environment and Development) and implications for the diffusion of cleaner technologies from North to South. (author). 36 refs

  18. Bottom head failure program plan

    International Nuclear Information System (INIS)

    Meyer, R.O.

    1989-01-01

    Earlier this year the NRC staff presented a Revised Severe Accident Research Program Plan (SECY-89-123) to the Commission and initiated work on that plan. Two of the near-term issues in that plan involve failure of the bottom head of the reactor pressure vessel. These two issues are (1) depressurization and DCH and (2) BWR Mark I Containment Shell Meltthrough. ORNL has developed models for several competing failure mechanisms for BWRs. INEL has performed analytical and experimental work directly related to bottom head failure in connection with several programs. SNL has conducted a number of analyses and experimental activities to examine the failure of LWR vessels. In addition to the government-sponsored work mentioned above, EPRI and FAI performed studies on vessel failure for the Industry Degraded Core Rulemaking Program (IDCOR). EPRI examined the failure of a PWR vessel bottom head without penetrations, as found in some Combustion Engineering reactors. To give more attention to this subject as called for by the revised Severe Accident Research Plan, two things are being done. First, work previously done is being reviewed carefully to develop an overall picture and to determine the reliability of assumptions used in those studies. Second, new work is being planned for FY90 to try to complete a reasonable understanding of the failure process. The review and planning are being done in close cooperation with the ACRS. Results of this exercise will be presented in this paper

  19. 78 FR 57450 - State Rail Plan Guidance

    Science.gov (United States)

    2013-09-18

    ... of impact assessment required for the rail infrastructure, facilities, and service improvements contained in State rail plans. Other issues raised by commenters included the importance of involving... to emphasize the importance of preparing State rail plans within the policy and procedural contexts...

  20. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  1. Institutional Research's Role in Strategic Planning

    Science.gov (United States)

    Voorhees, Richard A.

    2008-01-01

    Institutions that have organized and centralized their data enjoy an obvious advantage in grappling with strategic planning and other issues. As the drumbeat for accountability, planning, and demonstrating effectiveness to internal and external stakeholders intensifies, the stature and importance of institutional research offices on most campuses…

  2. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  3. Volume 5, Issue 1

    Directory of Open Access Journals (Sweden)

    Karen Nelson

    2014-03-01

    Full Text Available The Feature in this issue is a conversation with Richard James, a highly respected Australian academic with extensive experience in research and policy development on the First Year Experience. Richard discusses the inevitability of universal participation in tertiary education and its impact on the style of participation, student diversity, the shifting focus of decision-making on standards and credentialism; and addresses the challenges posed by these and related issues for universities and the First Year Experience, along with possible solutions.

  4. Dips spacecraft integration issues

    International Nuclear Information System (INIS)

    Determan, W.R.; Harty, R.B.

    1988-01-01

    The Department of Energy, in cooperation with the Department of Defense, has recently initiated the dynamic isotope power system (DIPS) demonstration program. DIPS is designed to provide 1 to 10 kW of electrical power for future military spacecraft. One of the near-term missions considered as a potential application for DIPS was the boost surveillance and tracking system (BSTS). A brief review and summary of the reasons behind a selection of DIPS for BSTS-type missions is presented. Many of these are directly related to spacecraft integration issues; these issues will be reviewed in the areas of system safety, operations, survivability, reliability, and autonomy

  5. Legal and institutional issues

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Leaving aside the natural desire to avoid the difficulties imposed by the enormously complex siting and certification process, a utility might decide to forego adding new capacity because of a variety of legal and institutional disincentives. Some of these are discussed in this chapter. The addition of new lines to support a competitive generating market also raises unique institutional issues. Perhaps the most important of these is the question of who should pay for the necessary capital expenditures. This issue also is discussed in this section

  6. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  7. Planning, Anticipatory Systems, and Kinds of Actors

    Science.gov (United States)

    Jorna, René; van Wezel, Wout

    2002-09-01

    Anticipation and planning have much in common. Anticipation means being ahead of things. Planning means not only anticipating on things to come, but also trying to determine a course of action to reach a goal. Planning is investigated in many domains, for example, in economy, biology, and in the cognitive sciences. Each of these domains uses its own research methodologies, languages, ontologies, and models. Although there are many differences between the various approaches and models, there must of course also be similarities, since they all deal with establishing a future course of actions to reach a goal. We will compare several planning approaches on a number of aspects, e.g., the kind of entity that makes the plan (natural or artificial), whether the plan is executed by the planner or by another entity, representational issues, and the domain that the plan is executed in. Our article focuses on analytical dimensions in the extended field of planning. We do not discuss empirical results.

  8. Landfilling: Environmental Issues

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund; Manfredi, Simone; Kjeldsen, Peter

    2011-01-01

    , the extent and quality of the technical environmental protection measures introduced, the daily operation and the timescale. This chapter describes the main potential environmental impacts from landfills. The modern landfill is able to avoid most of these impacts. However, in the planning and design...

  9. Research Article Special Issue

    African Journals Online (AJOL)

    2017-02-15

    Feb 15, 2017 ... they have no special development plan and their authorities actually do not know about the ... Keywords: Converted villages to city centers, urban network, SWOT analysis, ... rural areas and can decrease regional differences in developing ... Small scale cities are necessary for integration of rural and urban.

  10. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-05-01

    May 1, 2018 ... This pilot test was ... or resources-are more difficult to acquire. ... are always the most optimal approach, by not taking into account hidden ... planning or allocation on the part of the governmental agencies [8]. ..... study on causes and effects of communication gaps in large-scale software development. In.

  11. Research Article Special Issue

    African Journals Online (AJOL)

    2018-01-15

    Jan 15, 2018 ... ed major disasters around the world and these include Malaysia wh .... The government requires RM9.32 billion for the construction of all ... For this case, community-based preparedness plan is a bottom up approach in ...

  12. Research Article Special Issue

    African Journals Online (AJOL)

    Published online: 15 January 2018. ABSTRACT ... Keywords: supply chain performance, Six Sigma, total productive maintenance. ... Supply chain management is defined as the design, planning, execution, control and monitoring of supply chain activities ... A Black Belt is someone who has been trained to use advanced.

  13. Research Article Special Issue

    African Journals Online (AJOL)

    2016-07-16

    Jul 16, 2016 ... STUDYING THE FACTORS AFFECTING URBAN DISPERSION IN MASHHAD ... population growth rate for review and analysis, and at first by examining area ... centers, dense population and employment and road network ..... regional planning. ... of the urban front of the building density index (case study.

  14. JPRS Report Environmental Issues

    Science.gov (United States)

    1990-11-21

    massive con- centrations of algae in this area, as well. Goal in Sweden Is To Cut Coastal Community Nitrogen Discharges in Half Recent sutdies clearly...all coastal community treatment plants to half of what they were. They plan to reduce the volume of nitrogen by as much as 80 percent by 1992 in

  15. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... The project challenges include the lack of electricity in the installation ... so that in this project once a sudden increase in consumption is spotted an alarm ..... and timely predictions for flood control, drought, and planning for ...

  16. JPRS Report, Proliferation Issues

    Science.gov (United States)

    1992-05-20

    accepted, Research Organisation’s (ISRO) Polar Satellite Launch according to defence analysts here. Vehicle (PSLV) has been planned at Balasore in Orissa...the slightest of ISRO’s Balasore satellite launch station. The figure is sensitivity to Indian security needs and concerns, the same as last year. JPRS

  17. Research Article Special Issue

    African Journals Online (AJOL)

    Published online: 15 February 2017 ... average concentrations of Pb, Cr, MN, Fe higher than drinking water ... unsystematic waste disposal and according to the principles of natural biological ..... Solid waste; First Edition, Tehran, Islamic Azad University, ... 11-Waste management master plan of the central area of Guilan: ...

  18. Colombia: Issues for Congress

    National Research Council Canada - National Science Library

    Veillette, Connie

    2005-01-01

    ... into sharper focus after the attacks of September 11, 2001. The United States has made a significant commitment of funds and material support to help Colombia and the Andean region fight drug trafficking since the development of Plan Colombia in 1999...

  19. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-04-18

    Apr 18, 2018 ... proven from the numerous efforts and strategies that have been planned and ... establishment of the Muslim Friendly Hospitality Services (MFHS) .... also must ensure that the supplier also understands the real concept of Halal food. .... Member States, Tourism Management Perspectives, 19 (2016), 144-149.

  20. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-05-01

    May 1, 2018 ... differ in sizes from 8 to 60 ha, depending on the location and amount of ... 10th Malaysia Plan (2011-2015) intends to close and rehabilitate most of the existing ... In this business, many players are involved; ranging from small ...

  1. Research Article Special Issue

    African Journals Online (AJOL)

    2017-09-10

    Sep 10, 2017 ... military transformation strategy that led many armed forces around the world scrambling to follow suit. Today ... business strategies [6], management of portfolios and identify business priorities as well as managing resources and time ... forecasted and planned. The generic CBP framework is shown in Fig.

  2. Physics issues on triggering

    Indian Academy of Sciences (India)

    The detectors at the ILC are planned to run without hardware trigger. The ... as not coming from the interaction point and not matching to the silicon detectors ... electrons so that additional dE/dx cuts can help, making also here a factor 10 or.

  3. VOYAGE PLANNING

    Directory of Open Access Journals (Sweden)

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  4. LMFBR safety experiment facility planning and analysis

    International Nuclear Information System (INIS)

    Stevenson, M.G.; Scott, J.H.

    1976-01-01

    In the past two years considerable effort has been placed on the planning and design of new facilities for the resolution of LMFBR safety issues. The paper reviews the key issues, the experiments needed to resolve them, and the design aspects of proposed new facilities. In addition, it presents a decision theory approach to selecting an optimal combination of modified and new facilities

  5. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  6. Big plans.

    Science.gov (United States)

    Fitch, Kevin F; Doyle, James F

    2005-09-01

    In Elmhurst Memorial Healthcare's capital planning method: Future replacement costs of assets are estimated by inflating their historical cost over their lives. A balanced model is created initially based on the assumption that rates of revenue growth, inflation, investment income, and interest expense are all equal. Numbers then can be adjusted to account for possible variations, such as excesses or shortages in investment or debt balances.

  7. Strategic plan

    International Nuclear Information System (INIS)

    1993-01-01

    In November 1989, the Office of Environmental Restoration and Waste Management (EM) was formed within the US Department of Energy (DOE). The EM Program was born of the recognition that a significant national effort was necessary to clean up over 45 years' worth of environmental pollution from DOE operations, including the design and manufacture of nuclear materials and weapons. Within EM, the Deputy Assistant Secretary for Environmental Restoration (EM-40) has been assigned responsibility for the assessment and cleanup of areas and facilities that are no longer a part of active DOE operations, but may be contaminated with varying levels and quantifies of hazardous, radioactive, and n-mixed waste. Decontamination and decommissioning (D ampersand D) activities are managed as an integral part of Envirorunental Restoration cleanup efforts. The Office of Environmental Restoration ensures that risks to the environment and to human health and safety are either eliminated or reduced to prescribed, acceptable levels. This Strategic Plan has been developed to articulate the vision of the Deputy Assistant Secretary for Environmental Restoration and to crystallize the specific objectives of the Environmental Restoration Program. The document summarizes the key planning assumptions that guide or constrain the strategic planning effort, outlines the Environmental Restoration Program's specific objectives, and identifies barriers that could limit the Program's success

  8. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-02-01

    Feb 1, 2018 ... the Russian philosophical and sociological thought. The thoughts of the Russian scientist ... Research Article. Special Issue. Journal of Fundamental and Applied Sciences is licensed under a Creative Commons Attribution-NonCommercial 4.0. International License. Libraries Resource Directory. We are ...

  9. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... Research Article. Special Issue. Journal of Fundamental and Applied Sciences is licensed under a Creative Commons Attribution-NonCommercial 4.0. International License. ... innovation is defined as: accepting ideas or behaviors in the organization that are novel and unfamiliar. Innovation can be in form ...

  10. Fusion Canada issue 18

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on the ITER agreement signed with the EDA, the robotic maintenance for NET, the CFFTP Fusion Pilot Study, the new IEA joint programs on environment, safety and economic aspects of fusion power, and a review by the CCFM advisory committee. 3 figs.

  11. PKI Scalability Issues

    OpenAIRE

    Slagell, Adam J; Bonilla, Rafael

    2004-01-01

    This report surveys different PKI technologies such as PKIX and SPKI and the issues of PKI that affect scalability. Much focus is spent on certificate revocation methodologies and status verification systems such as CRLs, Delta-CRLs, CRS, Certificate Revocation Trees, Windowed Certificate Revocation, OCSP, SCVP and DVCS.

  12. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-10-17

    Oct 17, 2017 ... Perak, Malaysia was observed under ral waste in powder and xtract generated optimum produce highest length of fectively improved shoot ed faster effect on C. ed positive result for the shed light on how the Z. C. nutans. This study ld application. pagation; Zea mays stem. Research Article. Special Issue ...

  13. Career Issues in Organizations.

    Science.gov (United States)

    1997

    This document contains four papers from a symposium on career issues in organizations. "Learning During Downsizing: Stories from the Survivors" (Sharon J. Confessore) describes a study to demonstrate that survivors of corporate downsizings undertake learning activities and use many resources to accomplish the learning tasks.…

  14. Fusion Canada issue 8

    International Nuclear Information System (INIS)

    1989-08-01

    A short bulletin from the National Fusion Program. Included in this issue are Canada-ITER contributions, NET Fuel Processing Loop, Bilateral Meeting for Canada-Europe, report from Tokamak de Varennes and a report from the University of Toronto on materials research for Fusion Reactors. 3 figs

  15. Fusion Canada issue 7

    International Nuclear Information System (INIS)

    1989-05-01

    A short bulletin from the National Fusion Program. Included in this issue are CFFTP highlights on the Karlsruhe Isotope Separation System, a report on ITER tritium process systems, an experimental update on Tokamak de Varennes and Canada-U.S. bilateral technical collaboration topics. 2 figs

  16. Fusion Canada issue 17

    International Nuclear Information System (INIS)

    1992-05-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on increased funding for the Canadian Fusion Program, news of the compact Toroid fuelling gun, an update on Tokamak de Varennes, the Canada - U.S. fusion meeting, measurements of plasma flow velocity, and replaceable Tokamak divertors. 4 figs

  17. Fusion Canada issue 15

    International Nuclear Information System (INIS)

    1991-10-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on the 1996 IAEA Fusion Conference site, operations at the Tokamak de Varennes including divertor pumping of impurities and pumping of carbon monoxide and methane, a discussion of the CFFTP and it's role. 1 fig

  18. Research Article Special Issue

    African Journals Online (AJOL)

    2018-01-15

    Jan 15, 2018 ... Journal of Fundamental and Applied Scienc. ISSN 1112-9867 ... (0.9623, 0.3857) and (0.9975, ity, temperature, CO, UVB and. 10 concentration. In by using ANN or Fit model. Research Article. Special Issue .... The EM algorithm is a simple computational implementation to find the posterior mode. Fig.

  19. Fusion Canada issue 18

    International Nuclear Information System (INIS)

    1992-08-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on the ITER agreement signed with the EDA, the robotic maintenance for NET, the CFFTP Fusion Pilot Study, the new IEA joint programs on environment, safety and economic aspects of fusion power, and a review by the CCFM advisory committee. 3 figs

  20. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-07

    Mar 7, 2018 ... nology Management and Technopreneurship, Universiti Teknikal Mal .... development of SMEs which are recession, global sourcing, lack of ..... issues act as barriers to export which are product quality, logistics and shipping, ... may influenced on the supply chain of payment and the operation cost itself.

  1. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-10-05

    Oct 5, 2017 ... ources and Food Industry, Universiti Sultan ZainalAbidin, 22200 Besut, ... ty problem has become a major issue in Malaysia for the past two decade ... pollution can be defined as contamination of the indoor or outdoor ...

  2. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... twice in Iran (Department of Housing and Urban Development,2008,4). Thus, in recent years, ..... For example study of 1200 schoolchildren from four education regions in Tehran Showed that after ... In this case It is expected that be ... In a communication network issue Hierarchy, access and. Sidewalks are ...

  3. Research Issues in VDSL

    Indian Academy of Sciences (India)

    First page Back Continue Last page Overview Graphics. Research Issues in VDSL. How to cancel cross-talk? How to remove alien noise? Alien Noise is the crosstalk typically from non-VDSL users, using the same bundle. How to allocate power across different tones, also called Optimal Spectrum Balancing ...

  4. Introduction: The Transparency Issue

    NARCIS (Netherlands)

    Teurlings, J.; Stauff, M.

    2014-01-01

    Besides giving an overview on the individual contributions, this introduction to the special issue on transparency delineates a conceptual context for a critical analysis of the contemporary discourse on transparency and the media mechanisms related to it. It focuses on three ambivalences inherent

  5. Automated conflict resolution issues

    Science.gov (United States)

    Wike, Jeffrey S.

    1991-01-01

    A discussion is presented of how conflicts for Space Network resources should be resolved in the ATDRSS era. The following topics are presented: a description of how resource conflicts are currently resolved; a description of issues associated with automated conflict resolution; present conflict resolution strategies; and topics for further discussion.

  6. Fusion Canada issue 21

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-01

    A short bulletin from the National Fusion Program highlighting in this issue Europe proposes Canada`s participation in ITER, tritium for JET, CCFM/TdeV-Tokamak helium pumping and TdeV update, ITER-related R and D at CFFTP, ITER Deputy Director visits Canada, NFP Director to Chair IFRC, Award for Akira Hirose. 3 figs.

  7. Fusion Canada issue 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on availability of Canadian Tritium, an ITER update, a CCFM update on Tokamak and the new team organization, an international report on Fusion in Canada and a Laser Fusion Project at the University of Toronto. 3 figs.

  8. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-07

    Mar 7, 2018 ... in the development of more up-to-date urban space. ... The goal of this paper is to analyze the issues of the organization of urban environment in ... The model of transport less micro-district Nebo (ACADEMIA gallery), the ...

  9. Fusion Canada issue 22

    International Nuclear Information System (INIS)

    1993-10-01

    A short bulletin from the National Fusion Program highlighting in this issue a bi-lateral meeting between Canada and Japan, water and hydrogen detritiation, in-situ tokamak surface analysis, an update of CCFM/TdeV and tritium accounting Industry guidance in Fusion, fast probe for plasma-surface interaction. 4 figs

  10. Fusion Canada issue 15

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-10-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on the 1996 IAEA Fusion Conference site, operations at the Tokamak de Varennes including divertor pumping of impurities and pumping of carbon monoxide and methane, a discussion of the CFFTP and it`s role. 1 fig.

  11. Accelerating News Issue 5

    CERN Document Server

    Szeberenyi, A

    2013-01-01

    In this spring issue, we look at developments towards higher luminosity and higher energy colliders. We report on the technology developed for the remote powering of the LHC magnets and studies of diagnostics based on higher order mode port signals. We also inform you about the main outcome of the TIARA survey on market needs for accelerator scientists.

  12. Fusion Canada issue 28

    International Nuclear Information System (INIS)

    1995-06-01

    A short bulletin from the National Fusion Program highlighting in this issue the Canada - US fusion meeting in Montreal, fusion breeder work in Chile, new management at CFFTP, fast electrons in tokamaks: new data from TdeV, a program review of CCFM and Velikhov to address Montreal fusion meeting. 1 fig

  13. Fusion Canada issue 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-01-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on Ontario Hydro`s contract for tritium supply from Germany, a CCFM update on plasma biasing, divertor operation, radiofrequency plasma current drive and the plasma heating system for the Tokamak de Varennes, and an agreement for ITER engineering design activities. 5 figs.

  14. Fusion Canada issue 8

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-08-01

    A short bulletin from the National Fusion Program. Included in this issue are Canada-ITER contributions, NET Fuel Processing Loop, Bilateral Meeting for Canada-Europe, report from Tokamak de Varennes and a report from the University of Toronto on materials research for Fusion Reactors. 3 figs.

  15. Fusion Canada issue 17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-05-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on increased funding for the Canadian Fusion Program, news of the compact Toroid fuelling gun, an update on Tokamak de Varennes, the Canada - U.S. fusion meeting, measurements of plasma flow velocity, and replaceable Tokamak divertors. 4 figs.

  16. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-07

    Mar 7, 2018 ... technological innovations and the spread of knowledge. ... In this paper, we propose a conceptual model to search relevant scientific ... The digital libraries are becoming a source for discovering new research trends ... Text mining techniques are used to solve some particular business issues, so it is called.

  17. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-07

    Mar 7, 2018 ... ethical issues behind the retrieval of organs (commitment to ... The article reviews the practices of European countries and attitude of the EU citizens to the .... knowledge that the purchase and sale of donor organs is prohibited ...

  18. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-05-01

    May 1, 2018 ... stability is a very good issue of the power systems resilience to the high disturbances. In this paper, a mirror-fuzzy controller scaled by PSO has been proposed ... In many system analysis, the researchers have configured the ...

  19. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-11-24

    Nov 24, 2017 ... you …? and passive form of a verb. In the Tatar language the verb kuru with gerund is used. In English for strengthening the auxiliary verb do, a modal verb must, a modal construction to be to are used. 6. DISCUSSIONS. The issue touched in this research is object of steady and long interest from domestic ...

  20. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-10-05

    Oct 5, 2017 ... Journal of Fundamental and Applied Sciences. ISSN 1112-9867. Available online at http://www.jfas.info. Research Article. Special Issue .... of use. Three critical success factors of e-learning (instructor characteristics, student characteristics .... Total of 95 questionnaires were used for further data analysis.

  1. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... Journal of Fundamental and Applied Sciences is licensed under a Creative ... 1. Faculty of Engineering, Civil Engineering Department, Urmia Branch, ..... Table 4. Sections of the main components of 16 stories building ..... International Journal of Engineering Science and Innovative ... Issue 1, January 2013.

  2. Fusion Canada issue 25

    International Nuclear Information System (INIS)

    1994-08-01

    A short bulletin from the National Fusion Program highlighting in this issue an economic impact study of the Canadian site for ITER, Harvey Skarsgard: fusion pioneer retires, NFP: Phillips and Holtslander exchange roles, Europe's fusion funding proposals and an update of CCFM/TdeV. 1 fig

  3. Overview of Special Issue

    NARCIS (Netherlands)

    Hiemstra, Djoerd; Harman, Donna; Allan, James; Kelly, Diane; Belkin, Nicholas J.; Bennet, Paul; Callan, Jamie; Clarke, Charles; Diaz, Fernando; Dumais, Susan; Ferro, Nicola; Harman, Donna; Ruthven, Ian; Sakai, Tetsuya; Smucker, Mark D.; Zobel, Justin

    2017-01-01

    This special issue of SIGIR Forum marks the 40th anniversary of the ACM SIGIR Conference by showcasing papers selected for the ACM SIGIR Test of Time Award from the years 1978-2001. These papers document the history and evolution of IR research and practice, and illustrate the intellectual impact

  4. Special Issue Editorial

    African Journals Online (AJOL)

    While this special issue focuses on work in the South African context, ... practice) with youth addresses the key imperatives of (un)employment, age, ... patterns of male control over sexual encounters and women's sexuality are emergent ... in the paper by Ngabaza, Bojarczuk, Masuku and Roelfse, titled, 'Empowering young.

  5. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-03-07

    Mar 7, 2018 ... Labor deployment issues play an important role in analyzing their use at the country or regional level .... The growth of employment in the service sector since the 50s, as a result of the rapid ... Hotels and restaurants. 23,0 ..... for the better, its number decreases and the quality of labor resources deteriorates.

  6. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-11-24

    Nov 24, 2017 ... FEDERAL UNIVERSITY (FROM EMOTIONAL EDUCATION TO GLOBAL. THINKING ... ANNOTATION. The article highlights the topical issues of human education of the future humanistic- ... conditions (continuous self-education, updating and integration of educational resources on the basis of the ...

  7. Fusion Canada issue 21

    International Nuclear Information System (INIS)

    1993-08-01

    A short bulletin from the National Fusion Program highlighting in this issue Europe proposes Canada's participation in ITER, tritium for JET, CCFM/TdeV-Tokamak helium pumping and TdeV update, ITER-related R and D at CFFTP, ITER Deputy Director visits Canada, NFP Director to Chair IFRC, Award for Akira Hirose. 3 figs

  8. Fusion Canada issue 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-05-01

    A short bulletin from the National Fusion Program. Included in this issue are CFFTP highlights on the Karlsruhe Isotope Separation System, a report on ITER tritium process systems, an experimental update on Tokamak de Varennes and Canada-U.S. bilateral technical collaboration topics. 2 figs.

  9. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-10-05

    Oct 5, 2017 ... culture of Mamak frequenting restaurants in Malaysia, several issue has risen in relation to the .... employment of one group quasi experimental design was noted to be lacked in internal ... Food safety and quality division: ... self-reported practices of food service staff regarding food hygiene in Edirne, Turkey ...

  10. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2017-08-08

    Aug 8, 2017 ... presented in the form of a matrix in which processing of vectors is conducted by a conveyor way. ... The modularity of structure of the product systemand standardization of basic operations allow to create ... Thus, the actual issue of modern CT is the organization and hardware support of parallel production.

  11. Fusion Canada issue 26

    International Nuclear Information System (INIS)

    1994-11-01

    A short bulletin from the National Fusion Program highlighting in this issue tritium supply for Japanese research, Canada to host the 1995 IAEA Conference on Tritium, studies on the tokamak divertor and edge plasma studies, a tritium field release study, erosion studies on plasma facing materials, G. Pacher returns to CCFM and an update on CCFM/TdeV

  12. Fusion Canada issue 4

    International Nuclear Information System (INIS)

    1988-05-01

    A short bulletin from the National Fusion Program. Included in this issue is a technical update on Tokamak de Varennes, a report on the Beatrix II Breeding Materials Test Program, the Tritium glovebox system for UPM, Saudi Arabia, a broad update of the Canadian Fusion Fuels Technology Project is also included. 1 fig

  13. Issues of HRD. Symposium.

    Science.gov (United States)

    2002

    This document contains three papers from a symposium on issues of human resource development (HRD). "The Complex Roots of Human Resource Development" (Monica Lee) discusses the roots of HRD within the framework of the following views of management: (1) classic (the view that managers must be able to create appropriate rules and…

  14. Career Issues in HRD.

    Science.gov (United States)

    1999

    This document contains four symposium papers on career issues in human resource development (HRD). "Are Careers What They Used To Be: A Factor Analysis of Schein's Career Orientations Inventory" (Gerri Mukri, Sharon Confessore) is a statistical analysis of Schein's Career Orientations Inventory that finds the inventory to be a…

  15. Ethical issues in neurogenetics.

    Science.gov (United States)

    Uhlmann, Wendy R; Roberts, J Scott

    2018-01-01

    Many neurogenetic conditions are inherited and therefore diagnosis of a patient will have implications for the patient's relatives and can raise ethical issues. Predictive genetic testing offers asymptomatic relatives the opportunity to determine their risk status for a neurogenetic condition, and professional guidelines emphasize patients' autonomy and informed, voluntary decision making. Beneficence and nonmaleficence both need to be considered when making decisions about disclosure and nondisclosure of genetic information and test results. There can be disclosure concerns and challenges in determining whose autonomy to prioritize when a patient makes a genetic testing decision that can reveal the genetic status of a relative (e.g., testing an adult child when the at-risk parent has not been tested). Ethical issues are prominent when genetic testing for neurogenetic conditions is requested prenatally, on minors, adoptees, adult children at 25% risk, and for individuals with psychiatric issues or cognitive impairment. Neurogenetic conditions can result in cognitive decline which can affect decisional capacity and lead to ethical challenges with decision making, informed consent, and determining the patient's ability to comprehend test results. The ethical implications of genetic testing and emerging issues, including direct-to-consumer genetic testing, disclosure of secondary findings from genomic sequencing, and use of apolipoprotein E testing in clinical and research settings, are also discussed. Resources for information about genetic testing practice guidelines, insurance laws, and directories of genetics clinics are included. Copyright © 2018 Elsevier B.V. All rights reserved.

  16. Fusion Canada issue 12

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-10-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on Darlington`s Tritium Removal Facility, work at universities on Deuterium Diffusivity in Beryllium, Fusion Studies, confinement research and the operation of divertors at Tokamak de Varennes. 5 figs.

  17. Research Article Special Issue

    African Journals Online (AJOL)

    pc

    2018-05-01

    May 1, 2018 ... The issues of information placement are considered on the website of the educational ... At present, a considerable attention is paid to the automation of educational ... schedule from any device quickly, since the system is the WEB service, which allows ... the system adaptation for its use on mobile devices.

  18. International Issues in Education

    Science.gov (United States)

    Ruggeri, Kai; Diaz, Carmen; Kelley, Karl; Papousek, Ilona; Dempster, Martin; Hanna, Donncha

    2008-01-01

    Anxiety, negative attitudes, and attrition are all issues presented in the teaching of statistics to undergraduates in research-based degrees regardless of location. Previous works have looked at these obstacles, but none have consolidated a multilingual, multinational effort using a consistent method. Over 400 Spanish-, English-, and…

  19. Ethical issues for librarians

    Directory of Open Access Journals (Sweden)

    Francisca Rasche

    2005-04-01

    Full Text Available It approaches the librarian ethics comprehending the Librarianship constitution from a systemic view. In this way, with the objective to raise issues to discuss professional ethics, it places the librarian in the work world and points approaches between exertion and relation context of the professionals themselves with the human rights and alteration ethics.

  20. Fusion Canada issue 22

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    A short bulletin from the National Fusion Program highlighting in this issue a bi-lateral meeting between Canada and Japan, water and hydrogen detritiation, in-situ tokamak surface analysis, an update of CCFM/TdeV and tritium accounting Industry guidance in Fusion, fast probe for plasma-surface interaction. 4 figs.