WorldWideScience

Sample records for plan tarp proposed

  1. Study on Mine Emergency Mechanism based on TARP and ICS

    Science.gov (United States)

    Xi, Jian; Wu, Zongzhi

    2018-01-01

    By analyzing the experiences and practices of mine emergency in China and abroad, especially the United States and Australia, normative principle, risk management principle and adaptability principle of constructing mine emergency mechanism based on Trigger Action Response Plans (TARP) and Incident Command System (ICS) are summarized. Classification method, framework, flow and subject of TARP and ICS which are suitable for the actual situation of domestic mine emergency are proposed. The system dynamics model of TARP and ICS is established. The parameters such as evacuation ratio, response rate, per capita emergency capability and entry rate of rescuers are set up. By simulating the operation process of TARP and ICS, the impact of these parameters on the emergency process are analyzed, which could provide a reference and basis for building emergency capacity, formulating emergency plans and setting up action plans in the emergency process.

  2. Implication of climate change on urban drainage systems of Chicago and Mainstream and DesPlaines (MS/DP) Tunnel and Reservoir Plan (TARP)

    Science.gov (United States)

    Luo, H.; Schmidt, A.; Garcia, M. H.; Oberg, N.

    2016-12-01

    The impact of changing climate patterns and rainfall extremes on sewer system and river basin has been brought to attention to the researchers worldwide. In 1972, the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) adopted the Tunnel and Reservoir Plan (TARP) to address combined sewer overflow (CSO) pollution and flooding problems in the Chicago land area. The hydrosystem laboratory in University of Illinois at Urbana-Champaign developed a series of numerical models accordingly to analyze the complex hydraulic behavior of the as-built TARP system. Due to the interconnected nature of City of Chicago sewer network and MS/DP TARP system, a tightly coupled hydrological and hydraulic model MetroFlow was developed to facilitate such analysis by integrating previous developed models. This study utilized MetroFlow to predict the hydrologic/hydraulic response of the system for a set of pre-determined design and historical storm events. Accordingly, combined sewer overflows (CSO) of Chicago combined sewer system and MS/DP TARP system were evaluated under current and future weather scenarios. The total CSOs from TARP system can be considered as urban point pollution source to the surrounding receiving bodies, hence the potential impact of climate change on CSO fluxes is essential reference to wastewater infrastructure design and operations of the hydraulic regulating structures under storm events to mitigate predicted risks.

  3. TARPs differentially decorate AMPA receptors to specify neuropharmacology.

    Science.gov (United States)

    Kato, Akihiko S; Gill, Martin B; Yu, Hong; Nisenbaum, Eric S; Bredt, David S

    2010-05-01

    Transmembrane AMPA receptor regulatory proteins (TARPs) are the first identified auxiliary subunits for a neurotransmitter-gated ion channel. Although initial studies found that stargazin, the prototypical TARP, principally chaperones AMPA receptors, subsequent research demonstrated that it also regulates AMPA receptor kinetics and synaptic waveforms. Recent studies have identified a diverse collection of TARP isoforms--types Ia, Ib II--that distinctly regulate AMPA receptor trafficking, gating and neuropharmacology. These TARP isoforms are heterogeneously expressed in specific neuronal populations and can differentially sculpt synaptic transmission and plasticity. Whole-genome analyses also link multiple TARP loci to childhood epilepsy, schizophrenia and bipolar disorder. TARPs emerge as vital components of excitatory synapses that participate both in signal transduction and in neuropsychiatric disorders. Copyright 2010 Elsevier Ltd. All rights reserved.

  4. The conserved Tarp actin binding domain is important for chlamydial invasion.

    Directory of Open Access Journals (Sweden)

    Travis J Jewett

    2010-07-01

    Full Text Available The translocated actin recruiting phosphoprotein (Tarp is conserved among all pathogenic chlamydial species. Previous reports identified single C. trachomatis Tarp actin binding and proline rich domains required for Tarp mediated actin nucleation. A peptide antiserum specific for the Tarp actin binding domain was generated and inhibited actin polymerization in vitro and C. trachomatis entry in vivo, indicating an essential role for Tarp in chlamydial pathogenesis. Sequence analysis of Tarp orthologs from additional chlamydial species and C. trachomatis serovars indicated multiple putative actin binding sites. In order to determine whether the identified actin binding domains are functionally conserved, GST-Tarp fusions from multiple chlamydial species were examined for their ability to bind and nucleate actin. Chlamydial Tarps harbored variable numbers of actin binding sites and promoted actin nucleation as determined by in vitro polymerization assays. Our findings indicate that Tarp mediated actin binding and nucleation is a conserved feature among diverse chlamydial species and this function plays a critical role in bacterial invasion of host cells.

  5. Laboratory-based bidirectional reflectance distribution functions of radiometric tarps

    International Nuclear Information System (INIS)

    Georgiev, Georgi T.; Butler, James J.

    2008-01-01

    Laboratory-based bidirectional reflectance distribution functions (BRDFs) of radiometric tarp samples used in the vicarious calibration of Earth remote sensing satellite instruments are presented in this paper. The results illustrate the BRDF dependence on the orientation of the tarps' weft and warp threads. The study was performed using the GSFC scatterometer at incident zenith angles of 0 deg., 10 deg., and 30 deg.; scatter zenith angles from 0 deg. to 60 deg.; and scatter azimuth angles of 0 deg., 45 deg., 90 deg., 135 deg., and 180 deg.. The wavelengths were 485 nm, 550 nm, 633 nm, and 800 nm. The tarp's weft and warp dependence on BRDF is well defined at all measurement geometries and wavelengths. The BRDF difference can be as high as 8% at 0 deg. incident angle and 12% at 30 deg. incident angle. The fitted BRDF data show a very small discrepancy from the measured ones. New data on the forward and backscatter properties of radiometric tarps are reported. The backward scatter is well pronounced for the white samples. The black sample has well-pronounced forward scatter. The provided BRDF characterization of radiometric tarps is an excellent reference for anyone interested in using tarps for radiometric calibrations. The results are NIST traceable

  6. Laboratory-based bidirectional reflectance distribution functions of radiometric tarps.

    Science.gov (United States)

    Georgiev, Georgi T; Butler, James J

    2008-06-20

    Laboratory-based bidirectional reflectance distribution functions (BRDFs) of radiometric tarp samples used in the vicarious calibration of Earth remote sensing satellite instruments are presented in this paper. The results illustrate the BRDF dependence on the orientation of the tarps' weft and warp threads. The study was performed using the GSFC scatterometer at incident zenith angles of 0 degrees, 10 degrees, and 30 degrees; scatter zenith angles from 0 degrees to 60 degrees; and scatter azimuth angles of 0 degrees, 45 degrees, 90 degrees, 135 degrees, and 180 degrees. The wavelengths were 485 nm, 550 nm, 633 nm, and 800 nm. The tarp's weft and warp dependence on BRDF is well defined at all measurement geometries and wavelengths. The BRDF difference can be as high as 8% at 0 degrees incident angle and 12% at 30 degrees incident angle. The fitted BRDF data show a very small discrepancy from the measured ones. New data on the forward and backscatter properties of radiometric tarps are reported. The backward scatter is well pronounced for the white samples. The black sample has well-pronounced forward scatter. The provided BRDF characterization of radiometric tarps is an excellent reference for anyone interested in using tarps for radiometric calibrations. The results are NIST traceable.

  7. Laboratory-Based BRDF Calibration of Radiometric Tarps

    Science.gov (United States)

    Georgiev, Georgi T.; Butler, James J.

    2007-01-01

    The current study provides the remote sensing community with important high accuracy laboratory-based BRDF calibration of radiometric tarps. The results illustrate the dependence of tarps' weft and warp threads orientation on BRDF. The study was done at incident angles of 0deg, 10deg, and 30deg; scatter zenith angles from 0deg to 60deg, and scatter azimuth angles of 0deg, 45deg, 90deg, 135deg, and 180deg. The wavelengths were 485nm, 550nm, 633nm and 800nm. The dependence is well defined at all measurement geometries and wavelengths. It can be as high as 8% at 0deg incident angle and 2% at 30deg incident angle. The fitted BRDF data show a very small discrepancy from the measured ones. New data on the forward and backscatter properties of radiometric tarps is reported. The backward scatter is well pronounced for the white samples. The black sample has well pronounced forward scatter. The BRDF characterization of radiometric tarps can be successfully extended to other structured surface fabric samples. The results are NIST traceable.

  8. Azartinių žaidimų populiarumas studentų tarpe

    OpenAIRE

    Smilgys, Edgaras

    2014-01-01

    Darbo objektas: azartiniai žaidimai studentų tarpe. Darbo tikslas: nustatyti azartinių žaidimų populiarumą studentų tarpe. Darbo uždaviniai: 1. Apibrėžti azartinių žaidimų sampratą. 2. Išsiaiškinti azartinių žaidimų pasiūlą ir paklausą. 3. Identifikuoti azartinių žaidimų populiarumą LSU I pakopos nuolatinės „Sportinės rekreacijos ir turizmo“ studijų programos I, II, III ir IV kurso studentų tarpe. Svarbiausi darbo rezultatai ir išvados: Azartiniai lošimai tai tokie žaidim...

  9. Chlamydial entry involves TARP binding of guanine nucleotide exchange factors.

    Directory of Open Access Journals (Sweden)

    B Josh Lane

    2008-03-01

    Full Text Available Chlamydia trachomatis attachment to cells induces the secretion of the elementary body-associated protein TARP (Translocated Actin Recruiting Protein. TARP crosses the plasma membrane where it is immediately phosphorylated at tyrosine residues by unknown host kinases. The Rac GTPase is also activated, resulting in WAVE2 and Arp2/3-dependent recruitment of actin to the sites of chlamydia attachment. We show that TARP participates directly in chlamydial invasion activating the Rac-dependent signaling cascade to recruit actin. TARP functions by binding two distinct Rac guanine nucleotide exchange factors (GEFs, Sos1 and Vav2, in a phosphotyrosine-dependent manner. The tyrosine phosphorylation profile of the sequence YEPISTENIYESI within TARP, as well as the transient activation of the phosphatidylinositol 3-kinase (PI3-K, appears to determine which GEF is utilized to activate Rac. The first and second tyrosine residues, when phosphorylated, are utilized by the Sos1/Abi1/Eps8 and Vav2, respectively, with the latter requiring the lipid phosphatidylinositol 3,4,5-triphosphate. Depletion of these critical signaling molecules by siRNA resulted in inhibition of chlamydial invasion to varying degrees, owing to a possible functional redundancy of the two pathways. Collectively, these data implicate TARP in signaling to the actin cytoskeleton remodeling machinery, demonstrating a mechanism by which C.trachomatis invades non-phagocytic cells.

  10. Dual Effects of TARP γ-2 on Glutamate Efficacy Can Account for AMPA Receptor Autoinactivation

    Directory of Open Access Journals (Sweden)

    Ian D. Coombs

    2017-08-01

    Full Text Available Fast excitatory transmission in the CNS is mediated mainly by AMPA-type glutamate receptors (AMPARs associated with transmembrane AMPAR regulatory proteins (TARPs. At the high glutamate concentrations typically seen during synaptic transmission, TARPs slow receptor desensitization and enhance mean channel conductance. However, their influence on channels gated by low glutamate concentrations, as encountered during delayed transmitter clearance or synaptic spillover, is poorly understood. We report here that TARP γ-2 reduces the ability of low glutamate concentrations to cause AMPAR desensitization and enhances channel gating at low glutamate occupancy. Simulations show that, by shifting the balance between AMPAR activation and desensitization, TARPs can markedly facilitate the transduction of spillover-mediated synaptic signaling. Furthermore, the dual effects of TARPs can account for biphasic steady-state glutamate concentration-response curves—a phenomenon termed “autoinactivation,” previously thought to reflect desensitization-mediated AMPAR/TARP dissociation.

  11. Attitudes of Business Students on the TARP Program: A Semantic Differential Analysis

    Science.gov (United States)

    Piotrowski, Chris; Guyette, Roger W., Jr.

    2011-01-01

    The TARP program, a federal response to the 2008 financial crisis, has generated much debate both inside and outside of academia. Since business ethics, corporate responsibility, and public policy form the basic educational framework of the undergraduate business school curriculum, we investigated attitudes toward the TARP in the Spring of 2009.…

  12. 76 FR 61046 - TARP Conflicts of Interest

    Science.gov (United States)

    2011-10-03

    ... conflict may depend on a variety of factors, including the type of conflict, the scope of work under the... DEPARTMENT OF THE TREASURY 31 CFR Part 31 RIN 1505-AC05 TARP Conflicts of Interest AGENCY... interim rule that provided guidance on conflicts of interest pursuant to Section 108 of the Emergency...

  13. Tarp-Assisted Cooling as a Method of Whole-Body Cooling in Hyperthermic Individuals.

    Science.gov (United States)

    Hosokawa, Yuri; Adams, William M; Belval, Luke N; Vandermark, Lesley W; Casa, Douglas J

    2017-03-01

    We investigated the efficacy of tarp-assisted cooling as a body cooling modality. Participants exercised on a motorized treadmill in hot conditions (ambient temperature 39.5°C [103.1°F], SD 3.1°C [5.58°F]; relative humidity 38.1% [SD 6.7%]) until they reached exercise-induced hyperthermia. After exercise, participants were cooled with either partial immersion using a tarp-assisted cooling method (water temperature 9.20°C [48.56°F], SD 2.81°C [5.06°F]) or passive cooling in a climatic chamber. There were no differences in exercise duration (mean difference=0.10 minutes; 95% CI -5.98 to 6.17 minutes or end exercise rectal temperature (mean difference=0.10°C [0.18°F]; 95% CI -0.05°C to 0.25°C [-0.09°F to 0.45°F] between tarp-assisted cooling (48.47 minutes [SD 8.27 minutes]; rectal temperature 39.73°C [103.51°F], SD 0.27°C [0.49°F]) and passive cooling (48.37 minutes [SD 7.10 minutes]; 39.63°C [103.33°F], SD 0.40°C [0.72°F]). Cooling time to rectal temperature 38.25°C (100.85°F) was significantly faster in tarp-assisted cooling (10.30 minutes [SD 1.33 minutes]) than passive cooling (42.78 [SD 5.87 minutes]). Cooling rates for tarp-assisted cooling and passive cooling were 0.17°C/min (0.31°F/min), SD 0.07°C/min (0.13°F/min) and 0.04°C/min (0.07°F/min), SD 0.01°C/min (0.02°F/min), respectively (mean difference=0.13°C [0.23°F]; 95% CI 0.09°C to 0.17°C [0.16°F to 0.31°F]. No sex differences were observed in tarp-assisted cooling rates (men 0.17°C/min [0.31°F/min], SD 0.07°C/min [0.13°F/min]; women 0.16°C/min [0.29°F/min], SD 0.07°C/min [0.13°F/min]; mean difference=0.02°C/min [0.04°F/min]; 95% CI -0.06°C/min to 0.10°C/min [-0.11°F/min to 0.18°F/min]). Women (0.04°C/min [0.07°F/min], SD 0.01°C/min [0.02°F/min]) had greater cooling rates than men (0.03°C/min [0.05°F/min], SD 0.01°C/min [0.02°F/min]) in passive cooling, with negligible clinical effect (mean difference=0.01°C/min [0.02°F/min]; 95% CI 0.001

  14. Kas netilpo tarp politikos ir diplomatijos?

    OpenAIRE

    Streikus, Arūnas

    2008-01-01

    The review analyzes A. Kasparavičius’s monograph “Tarp Politikos ir Diplomatijos: Šventasis Sostas ir Lietuvos Respublika” (Vilnius, 2008). The historiographic value of the study is undisputed. A. Kasperavičius had an opportunity to use a broad spectrum of sources, among which two sets of archive documents stand out: the funds of the archives of Ministry of Foreign Affairs of Lithuania and the Lithuanian Embassy under the Holy See in Rome. A. Kasparavičius managed to avoid the arid scientific...

  15. 31 CFR 30.11 - Q-11: Are TARP recipients required to meet any other standards under the executive compensation...

    Science.gov (United States)

    2010-07-01

    ... meet any other standards under the executive compensation and corporate governance standards in section... TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.11 Q-11: Are TARP recipients required to meet any other standards under the executive compensation and corporate governance standards in section...

  16. 31 CFR 30.15 - Q-15: What actions are necessary for a TARP recipient to comply with certification requirements...

    Science.gov (United States)

    2010-07-01

    ... COMPENSATION AND CORPORATE GOVERNANCE § 30.15 Q-15: What actions are necessary for a TARP recipient to comply... matter within the jurisdiction of the Federal government. Upon receipt of information indicating that any... Office of the Special Master for TARP Executive Compensation for compensation payments and structures as...

  17. 31 CFR 30.6 - Q-6: How does a TARP recipient comply with the requirement under § 30.4 (Q-4) of this part that...

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-6: How does a TARP recipient comply... recipient's employees? 30.6 Section 30.6 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.6 Q-6: How does a TARP recipient comply...

  18. 31 CFR 30.5 - Q-5: How does a TARP recipient comply with the requirements under § 30.4 (Q-4) of this part that...

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-5: How does a TARP recipient comply... recipient? 30.5 Section 30.5 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.5 Q-5: How does a TARP recipient comply with the...

  19. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-10: What actions are necessary for....10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a TARP...

  20. 17 CFR 240.14a-20 - Shareholder approval of executive compensation of TARP recipients.

    Science.gov (United States)

    2010-04-01

    ... to include a compensation discussion and analysis in their proxy statements in order to comply with... arising from financial assistance provided under the TARP, as defined in section 3(8) of the Emergency...-K (§ 229.402 of this chapter), including the compensation discussion and analysis, the compensation...

  1. 76 FR 7239 - Proposed Privacy Act Systems of Records

    Science.gov (United States)

    2011-02-09

    ... property interests, identity theft or fraud, or harm to the security or integrity of this system or other... notice of a proposed system of records entitled, ``Treasury/DO .225 --TARP Fraud Investigation...: Supervisory Fraud Specialist, Office of Financial Stability, 1500 Pennsylvania Avenue, NW., Washington, DC...

  2. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  3. 75 FR 41572 - Office of Financial Stability; Proposed Collection; Comment Request

    Science.gov (United States)

    2010-07-16

    ..., TARP Standards for Compensation Corporate Governance, provides guidance on the executive compensation and corporate governance provision of EESA that apply to entities that receive financial assistance... the executive compensation requirements; monitor and evaluate the compensation practices of TARP...

  4. 31 CFR 30.9 - Q-9: What actions are necessary for a TARP recipient to comply with the standards established...

    Science.gov (United States)

    2010-07-01

    ... prohibit any golden parachute payment to a SEO and any of the next five most highly compensated employees.... Employee A is a SEO of a TARP recipient. Employee A is entitled to a payment of three times his annual... terminated employment on July 1, 2008, at which time Employee B was a SEO of a financial institution...

  5. 31 CFR 30.4 - Q-4: What actions are necessary for a TARP recipient to comply with the standards established...

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-4: What actions are necessary for a... or manipulation of earnings)? 30.4 Section 30.4 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.4 Q-4: What actions are...

  6. Ecological planning proposal for Kruger National Park

    Science.gov (United States)

    van Riet, W. F.; Cooks, J.

    1990-05-01

    This article discusses an application of the ecological planning model proposed by Van Riet and Cooks. The various steps outlined in this model have been applied to Kruger National Park in South Africa. The natural features of Kruger National Park, which form the basis of such an ecological planning exercise and from which the various land use categories, values, and zoning classes can be determined, are discussed in detail. The suitability of each of the various features is analyzed and a final zoning proposal for Kruger National Park is suggested. Furthermore a method for selecting a site for a new camp is illustrated by referring to the site for the new Mopane rest camp which is now under construction in the Kruger National Park. The conclusion is reached that the proposed ecological planning model can be used successfully in planning conservation areas such as Kruger National Park and for the selection of the most desirable sites for the establishment of new rest camps. Its suitability as a practical model in such planning exercises is proven by the fact that the siting proposals of two new camps based on this model have been accepted by the National Parks Board, the controlling body of Kruger National Park.

  7. Clinical diagnostic exome evaluation for an infant with a lethal disorder: genetic diagnosis of TARP syndrome and expansion of the phenotype in a patient with a newly reported RBM10 alteration.

    Science.gov (United States)

    Powis, Zöe; Hart, Alexa; Cherny, Sara; Petrik, Igor; Palmaer, Erika; Tang, Sha; Jones, Carolyn

    2017-06-02

    Diagnostic Exome Sequencing (DES) has been shown to be an effective tool for diagnosis individuals with suspected genetic conditions. We report a male infant born with multiple anomalies including bilateral dysplastic kidneys, cleft palate, bilateral talipes, and bilateral absence of thumbs and first toes. Prenatal testing including chromosome analysis and microarray did not identify a cause for the multiple congenital anomalies. Postnatal diagnostic exome studies (DES) were utilized to find a molecular diagnosis for the patient. Exome sequencing of the proband, mother, and father showed a previously unreported maternally inherited RNA binding motif protein 10 (RBM10) c.1352_1353delAG (p.E451Vfs*66) alteration. Mutations in RBM10 are associated with TARP syndrome, an X-linked recessive disorder originally described with cardinal features of talipes equinovarus, atrial septal defect, Robin sequence, and persistent left superior vena cava. DES established a molecular genetic diagnosis of TARP syndrome for a neonatal patient with a poor prognosis in whom traditional testing methods were uninformative and allowed for efficient diagnosis and future reproductive options for the parents. Other reported cases of TARP syndrome demonstrate significant variability in clinical phenotype. The reported features in this infant including multiple hemivertebrae, imperforate anus, aplasia of thumbs and first toes have not been reported in previous patients, thus expanding the clinical phenotype for this rare disorder.

  8. Initial Radiometric Characteristics of KOMPSAT-3A Multispectral Imagery Using the 6S Radiative Transfer Model, Well-Known Radiometric Tarps, and MFRSR Measurements

    Directory of Open Access Journals (Sweden)

    Jong-Min Yeom

    2017-02-01

    Full Text Available On-orbit radiometric characterization of the multispectral (MS imagery of the Korea Aerospace Research Institute (KARI’s Korea Multi-Purpose Satellite-3A (KOMPSAT-3A, which was launched on 25 March 2015, was conducted to provide quantitative radiometric information about KOMPSAT-3A. During the in-orbit test (IOT, vicarious radiometric calibration of KOMPSAT-3A was performed using the Second Simulation of a Satellite Signal in the Solar Spectrum (6S radiative transfer model. The characteristics of radiometric tarps, the atmospheric optical depth from multi-filter rotating shadowband radiometer (MFRSR measurements, and sun–sensor–geometry were carefully considered, in order to calculate the exact top of atmosphere (TOA radiance received by KOMPSAT-3A MS bands. In addition, the bidirectional reflectance distribution function (BRDF behaviors of the radiometric tarps were measured in the laboratory with a two-dimensional hyperspectral gonioradiometer, to compensate for the geometry discrepancy between the satellite and the ASD FieldSpec® 3 spectroradiometer. The match-up datasets between the TOA radiance and the digital number (DN from KOMPSAT-3A were used to determine DN-to-radiance conversion factors, based on linear least squares fitting for two field campaigns. The final results showed that the R2 values between the observed and simulated radiances for the blue, green, red, and near-infrared (NIR bands, are greater than 0.998. An approximate error budget analysis for the vicarious calibration of KOMPSAT-3A showed an error of less than 6.8%. When applying the laboratory-based BRDF correction to the case of higher viewing zenith angle geometry, the gain ratio was improved, particularly for the blue (1.3% and green (1.2% bands, which exhibit high sensitivity to the BRDF of radiometric tarps during the backward-scattering phase. The calculated gain ratio between the first and second campaigns showed a less than 5% discrepancy, indicating that

  9. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  10. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  11. Proposed Site Treatment Plan (PSTP). STP reference document

    International Nuclear Information System (INIS)

    1995-01-01

    The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site's mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP

  12. A Tiered Approach to Retinopathy of Prematurity Screening (TARP) Using a Weight Gain Predictive Model and a Telemedicine System.

    Science.gov (United States)

    Gurwin, Jaclyn; Tomlinson, Lauren A; Quinn, Graham E; Ying, Gui-Shuang; Baumritter, Agnieshka; Binenbaum, Gil

    2017-01-05

    The Telemedicine Approaches to Evaluating Acute-Phase Retinopathy of Prematurity (e-ROP) Study telemedicine system of remote fundus image grading and The Children's Hospital of Philadelphia Retinopathy of Prematurity (CHOP-ROP) postnatal weight gain predictive model are 2 approaches for improving ROP screening efficiency. Current screening has low specificity for severe ROP. To describe a tiered approach to ROP screening (TARP) for identifying children who develop severe ROP using telemedicine and a predictive model synergistically. This investigation was a post hoc analysis of a cohort in the e-ROP Study (a multicenter prospective telemedicine study) and the Postnatal Growth and Retinopathy of Prematurity (G-ROP) Study (a multicenter retrospective cohort study). The setting was neonatal intensive care units at The Children's Hospital of Philadelphia and the Hospital of the University of Pennsylvania. Participants in the e-ROP Study were premature infants with a birth weight less than 1251 g and a known ROP outcome enrolled between May 25, 2011, and October 31, 2013. The G-ROP Study enrolled all infants undergoing ROP examinations with a known ROP outcome who were born between January 1, 2006, and December 31, 2011. The mean outcomes were the sensitivity for type 1 ROP, reductions in infants requiring imaging or examinations, numbers of imaging sessions and examinations, and total clinical encounters (imaging sessions and examinations combined). The following 4 screening approaches were evaluated: ROUTINE (only diagnostic examinations by an ophthalmologist), CHOP-ROP (birth weight and gestational age, with weekly weight gain initiating examinations when the risk cut point is surpassed), e-ROP IMAGING (trained reader grading of type 1 or 2 ROP initiates diagnostic examinations), and TARP (CHOP-ROP alarm initiates imaging, and imaging finding of severe ROP initiates diagnostic examinations). A total of 242 infants were included in the study, with a median birth

  13. Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary

    International Nuclear Information System (INIS)

    1995-01-01

    This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals

  14. 77 FR 16862 - Proposed Information Collection Request; Training, Training Plans, and Records

    Science.gov (United States)

    2012-03-22

    ...; Training, Training Plans, and Records AGENCY: Mine Safety and Health Administration, Labor. ACTION: Request... proposed extension of the information collection related to training, training plans, and records at these.... Agency: Mine Safety and Health Administration. Title: Part 46--Training, Training Plans, and Records. OMB...

  15. New transmission planning methodology for requesting proposals for wind generation

    Science.gov (United States)

    Isaacs, Andrew L.

    The increasing interest in renewable energy technologies during the last decade has caused conventional transmission and generation expansion planning methodologies to be strained and in some cases abandoned. This is due both to the quantity of generator interconnection requests and the constraints imposed by deregulated energy industry structures. One technique used to control the influx of renewable generation while maintaining competitive principles is a Request for Proposals (RFP). However, lack of transmission planning due to a disconnection between generation and transmission owners, difficulty in identifying viable projects, and high risk for proponents stand as obstacles to the goals of an RFP. This research proposes a procedure which minimizes the effect of these obstacles; meeting the purchaser requirements for low price and combining conventional planning concepts with feedback from competitive structures. The general features of the method include definition of generation limits and study area, expansion plan design, transmission cost evaluation, optimal selection of requested generation levels, and final selection of successful proponents. The method is shown to be effective in creating an RFP where proponents are well-informed and provided with cost certainty to reduce bid price, buyers are able to determine end costs of their energy, and good expansion planning principles are maintained. A case study using a real system in New Mexico demonstrates these concepts.

  16. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  17. Proposed business plan for energy efficiency in Brazil

    International Nuclear Information System (INIS)

    De Oliveira, Lilian Silva; Shayani, Rafael Amaral; De Oliveira, Marco Aurelio Gonçalves

    2013-01-01

    The Brazilian Ministry of Mines and Energy published the National Energy and Efficiency Plan, which calls for electricity savings of 10% by 2030. At first sight, the projected goal does not seem too ambitious, but this figure is nearly eighteen times the known historical savings for the country. Adjustments need to be made to the current energy efficiency business plan. This article suggests what should be changed in order to make the program more attractive and effective. These include changes on its organizational structure, legislation, verification of results and transparency. The new plan aims to eliminate some existing barriers and introduce new mechanisms that should help the country meet its future goals. - Highlights: • Brazil's successful efficiency program was presented, including the government's goal to increase the savings 25 times until 2030. • To achieve this huge goal, the national energy efficiency program needs a new approach, including new institutional arrangements. • These arrangements proposals are the useful contribution from this paper

  18. Proposals for enhancing tactical planning in grocery retailing with S&OP

    DEFF Research Database (Denmark)

    Dreyer, Heidi Carin; Kiil, Kasper; Dukovska-Popovska, Iskra

    2018-01-01

    Purpose-The purpose of this paper is to explore tactical planning in grocery retailing and propose how process and integration mechanisms from sales and operations planning (S&OP) can enhance retail tactical planning.Design/methodology/approach-This work follows an explorative design with case...... studies from the grocery retailing industry in Finland, Norway, and the UK.Findings-The tactical planning process focuses on demand management and securing product availability from suppliers in order to reach sales targets. Less attention is directed toward balancing supply and demand or toward providing...... a single plan to guide company operations. Planning appeared to be functionally oriented with limited coordination between functional plans, but it did include external integration that improved forecast accuracy.Research limitations/implications-The study involves grocery retailer cases with variable...

  19. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  20. 15 CFR 310.8 - Proposed plan for Federal participation.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Proposed plan for Federal participation. 310.8 Section 310.8 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE MISCELLANEOUS REGULATIONS OFFICIAL U.S...

  1. Development planning and appropriate technology: a dilemma and a proposal

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, G.

    1981-03-01

    This paper examines the present system of project paper preparation and project planning used by the US Agency for International Development and many donor agencies. Three approaches for meeting the evident weaknesses of the system - a holistic approach to the planning problem, an operant-conditioning approach to implementation, and a process approach to planning and implementation - are presented and critiqued. On the basis of the critique, an approach grounded in a search for an approximately appropriate technology is supported; and a proposal for an appropriate-technology evaluation system which would analyze alternative technologies, deliver information to the field level, supply needed information on technologies and implementation, constrain donor planners, reduce lag time, incorporate evaluations into future planning, and reduce dependence upon planners is presented. 66 references.

  2. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  3. 76 FR 47154 - Proposed Information Collection; Comment Request; California Signage Plan: Evaluation of...

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information Collection; Comment Request; California Signage Plan: Evaluation of Interpretive Signs AGENCY: National... This request is for a regular submission (new collection). The California Signage Plan is an organized...

  4. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  5. CMS proposes prioritizing patient preferences, linking patients to follow-up care in discharge planning process.

    Science.gov (United States)

    2016-03-01

    Hospital providers voice concerns about a proposed rule by the Centers for Medicare and Medicaid Services (CMS) that would require providers to devote more resources to discharge planning. The rule would apply to inpatients as well as emergency patients requiring comprehensive discharge plans as opposed to discharge instructions. CMS states that the rule would ensure the prioritization of patient preferences and goals in the discharge planning process, and also would prevent avoidable complications and readmissions. However, hospital and emergency medicine leaders worry that community resources are not yet in place to facilitate the links and follow-up required in the proposed rule, and that the costs associated with implementation would be prohibitive. The proposed rule would apply to acute care hospitals, EDs, long-term care facilities, inpatient rehabilitation centers, and home health agencies. Regardless of the setting, though, CMS is driving home the message that patient preferences should be given more weight during the discharge planning process. Under the rule, hospitals or EDs would need to develop a patient-centered discharge plan within 24 hours of admission or registration, and complete the plan prior to discharge or transfer to another facility. Under the rule, emergency physicians would determine which patients require a comprehensive discharge plan. Both the American Hospital Association and the American College of Emergency Physicians worry that hospitals will have to take on more staff, invest in training, and make changes to their electronic medical record systems to implement the provisions in the proposed rule.

  6. The Environmental Advisory Service (EASe): a decision support system for comprehensive screening of local land-use development proposals and comparative evaluation of proposed land-use plans

    OpenAIRE

    K P White; A P Sage; F A Rodammer; C T Peters

    1985-01-01

    The Environmental Advisory Service (EASe) is a decision support system which can provide assistance to local planning agencies in selecting land-development alternatives or in formulating land-use plans. EASe offers a comprehensive and consistent procedure for rating either a development proposal or a proposed plan. This procedure is based upon qualitative assessments of the impact of developments or plans on the natural environment, zoning and land use. public and private services, transport...

  7. Proposal of Constraints Analysis Method Based on Network Model for Task Planning

    Science.gov (United States)

    Tomiyama, Tomoe; Sato, Tatsuhiro; Morita, Toyohisa; Sasaki, Toshiro

    Deregulation has been accelerating several activities toward reengineering business processes, such as railway through service and modal shift in logistics. Making those activities successful, business entities have to regulate new business rules or know-how (we call them ‘constraints’). According to the new constraints, they need to manage business resources such as instruments, materials, workers and so on. In this paper, we propose a constraint analysis method to define constraints for task planning of the new business processes. To visualize each constraint's influence on planning, we propose a network model which represents allocation relations between tasks and resources. The network can also represent task ordering relations and resource grouping relations. The proposed method formalizes the way of defining constraints manually as repeatedly checking the network structure and finding conflicts between constraints. Being applied to crew scheduling problems shows that the method can adequately represent and define constraints of some task planning problems with the following fundamental features, (1) specifying work pattern to some resources, (2) restricting the number of resources for some works, (3) requiring multiple resources for some works, (4) prior allocation of some resources to some works and (5) considering the workload balance between resources.

  8. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  9. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  10. Bedfordshire County Structure Plan. Proposed alterations -Public participation statement. Policy 97: Nuclear waste

    International Nuclear Information System (INIS)

    1984-01-01

    The document describes steps taken, in accord with the Town and Country Planning Act 1971, by Bedfordshire County Council, submitting proposed Alterations to the County Structure Plan to the Secretary of State for the Environment. When approving the submission the Council decided to add an additional Alteration dealing with nuclear waste: as this had not been the subject of public consultation the Council decided to seek the public's views on the proposal before submitting the Alteration. The arrangements for consultation and a list of persons and organizations consulted are given, together with the arrangements for considering comments. (U.K.)

  11. Preservation of information about the repository for spent nuclear fuels - proposal for action plan

    International Nuclear Information System (INIS)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina

    2008-10-01

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  12. 75 FR 2161 - Proposed Extension of Information Collection; Comment Request; Employee Benefit Plan Claims...

    Science.gov (United States)

    2010-01-14

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration Proposed Extension of Information Collection; Comment Request; Employee Benefit Plan Claims Procedures Under ERISA AGENCY: Employee Benefits... Employee Benefits Security Administration (EBSA) is soliciting comments on a proposed extension of the...

  13. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  14. Proposed standby gasoline rationing plan: public comments

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    Under the proposed plan, DOE would allocate ration rights (rights to purchase gasoline) to owners of registered vehicles. All vehicles in a given class would receive the same entitlement. Essential services would receive supplemental allotments of ration rights as pririty firms. Once every 3 months, ration checks would be mailed out to all vehicle registrants, allotting them a certain amount of ration rights. These checks would then be cashed at Coupon Issuance Points, where the bearer would receive ration coupons to be used at gasoline stations. Large users of gasoline could deposit their allotment checks in accounts at ration banks. Coupons or checks would be freely exchangeable in a white market. A certain percentage of the gasoline supply would be set aside in reserve for use in national emergencies. When the plan was published in the Federal Register, public comments were requested. DOE also solicited comments from private citizens, public interest groups, business and industry, state and local governments. A total of 1126 responses were reveived and these are analyzed in this paper. The second part of the report describes how the comments were classified, and gives a statistical breakdown of the major responses. The last section is a discussion and analysis of theissue raised by commenting agencies, firms, associations, and individuals. (MCW)

  15. 78 FR 17224 - Environmental Impact Statement; Proposed South Puget Sound Prairie Habitat Conservation Plan...

    Science.gov (United States)

    2013-03-20

    ... sizable portion of South Puget Sound Prairie habitat is located in the urban-rural interface and in the...-FF01E00000] Environmental Impact Statement; Proposed South Puget Sound Prairie Habitat Conservation Plan... permit application would be associated the South Puget Sound Prairie Habitat Conservation Plan (Prairie...

  16. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  17. Fact Sheet: Supplemental Proposal: State Plans to Address Emissions during Startup, Shutdown and Malfunction (SSM)

    Science.gov (United States)

    On September 5, 2014, EPA proposed a rule supplementing and revising its February 2013 proposal to ensure states have plans in place that require industrial facilities across the country to follow air pollution rules during SSM operations.

  18. ORGANIZATION AND PLANNING IN CHILDREN WITH ADHD: EVALUATION AND PROPOSAL OF A STIMULATION PROGRAM

    Directory of Open Access Journals (Sweden)

    Josefina Rubiales

    2011-12-01

    Full Text Available The Attention Deficit Hyperactivity Disorder (ADHD is a neurobiological disorder of a complex and heterogeneous origin characterized by a persistent pattern of inattention, hyperactivity and / or impulsivity. Is one of the most common neurobehavioral disorders in childhood and adolescence, and one of the main reasons for consultation because of difficulties in school performance, behavior problems, difficulties of living at home and with peers, involvement in self-esteem and aggressiveness. The primary deficit is associated with executive dysfunction, among which is the organization and planning. The aim of this study was to compare the performance in organization and planning of children with and without a diagnosis of ADHD and submit a stimulation proposal according to their needs. MATERIALS AND METHODS: The clinical sample comprised 16 children diagnosed with ADHD and the control sample of 32 children without a diagnosis, in both cases 8 to 14 years old and from the city of Mar del Plata (Argentina. The instruments used to evaluate the organization and planning has been the subtest Torres of Mexico Child Neuropsychological Battery (ENI, and cubes subtests Construction, Completion and Management Object Test Story Weschler Intelligence for children and adolescents. The proposed treatment includes 8 sessions of stimulation. RESULTS AND CONCLUSIONS: Children with ADHD have greater difficulty in planning and organizational skills than the children of the control sample, from which it establishes a estimulation proposal, whose originality and advantage is accentuated in the ecological validity the process.

  19. Proposed plan for critical experiments supporting thorium fuel cycle development

    International Nuclear Information System (INIS)

    Gore, B.F.

    1978-09-01

    A preliminary plan is proposed for critical experiments to provide data needed for the recycle of thorium based nuclear fuels. The sequence of experimentation starts with well moderated solutions followed by highly concentrated low moderated solutions. It then progresses through lattices moderated by water, by water plus soluble poisons, and by fissile solutions, to solutions poisoned by raschig rings and soluble poisons. Final experiments would treat lattices moderated by poisoned fissile solution, and arrays of stored fissile units

  20. 78 FR 38070 - 30-Day Notice of Proposed Information Collection: Affirmative Fair Housing Marketing (AFHM) Plan

    Science.gov (United States)

    2013-06-25

    ... Information Collection: Affirmative Fair Housing Marketing (AFHM) Plan AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed information collection requirement... Title of Information Collection: Affirmative Fair Housing Marketing (AFHM) Plan. OMB Approval Number...

  1. 78 FR 4505 - Options Price Reporting Authority; Notice of Filing of Proposed Amendment to the Plan for...

    Science.gov (United States)

    2013-01-22

    ... Options Last Sale Reports and Quotation Information To Amend Section 3.5 of the OPRA Plan January 15, 2013... of Consolidated Options Last Sale Reports and Quotation Information (``OPRA Plan'').\\3\\ The proposed....opradata.com . The OPRA Plan provides for the collection and dissemination of last sale and quotation...

  2. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  3. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  4. Sustainability assessment: a tool for planning for sustainability as a desired outcome for a proposed development

    CSIR Research Space (South Africa)

    Haywood, L

    2009-08-01

    Full Text Available This paper presents a theoretical framework for planning for sustainability for any proposed development project. The objective of this framework is to foster and preserve the social ecological system in which the proposed development project...

  5. 78 FR 34973 - Proposal for Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana

    Science.gov (United States)

    2013-06-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9820-9] Proposal for Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY... direct final rulemaking, Indiana's State Plan to control air pollutants from Sewage Sludge Incinerators...

  6. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  7. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  8. 78 FR 13379 - Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations

    Science.gov (United States)

    2013-02-27

    ...] Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations AGENCY: National...) unpatented placer claims within Wrangell-St. Elias National Park and Preserve. Public Availability: This plan...: Wrangell-St. Elias National Park and Preserve Headquarters, Mile 106.8 Richardson Highway, Post Office Box...

  9. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  10. 76 FR 79710 - Notice of Lodging of Consent Decree Under the Clean Water Act

    Science.gov (United States)

    2011-12-22

    ... ten times the average dry weather flow for the average design year. The proposed Consent Decree... control floatables in such waterways; (3) post construction monitoring following completion of TARP; (4...

  11. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Science.gov (United States)

    2010-05-26

    ...; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093560837). The Office of Nuclear Security...

  12. Intertechnology Corporation proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-09-01

    This report has three major parts. The first of these derives the requirements for the Test and Evaluation plan from the System Level Plan which is summarized in Section II. The second part contains the proposed plan to fill these requirements and includes hardware and software recommendations as well as procedures and management considerations. Primary emphasis has been given to the remote site because this is the area in which the commercial part of the demonstration is most unique. Finally, some pre-demonstration activities are described. The pilot program is intended to resolve a number of issues which arose in the course of the T and E plan. These relate to choice of scan frequencies, compression algorithms, etc. It is also intended to confirm performance and cost effectiveness of the site data collection package. The base line measurements of attitudes, etc. provide a reference mark against which one can measure the non-technical effectiveness of the demonstration program. (WDM)

  13. Proposed plan for the management of bulk wastes at the Weldon Spring quarry, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-02-01

    This proposed plan addresses the management of contaminated bulk wastes at the Weldon Spring quarry. Activities at the site are being conducted by the US Department of Energy under its Surplus Facilities Management Program. A remedial investigation/feasibility study has been prepared in accordance with requirements of the Comprehensive Environmental Response. The purposes of the proposed plan are to present a notice and brief analysis of the proposed quarry bulk waste remedial action, describe the remedial action alternatives for this interim remedial action, identify the currently preferred alternative for managing the bulk wastes and present the rationale for this preference, serve as a companion document to the RI/FS and administrative record file for this action, and outline the public's role in the decision-making process for this action. 2 figs., 4 tabs

  14. 76 FR 6727 - Proposed Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To...

    Science.gov (United States)

    2011-02-08

    ... location. Written comments will be accepted through the close of business on March 16, 2011. Locations: The... Regulations, Water Code and Comprehensive Plan To Provide for Regulation of Natural Gas Development Projects... proposed rule containing tentative dates and locations for public hearings on proposed amendments to its...

  15. 77 FR 55224 - Notice of Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and...

    Science.gov (United States)

    2012-09-07

    ... Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and California Desert... California Desert Conservation Area (CDCA) Plan Amendment/Final Environmental Impact Statement (EIS), for the.... District Court in September 2006. Portions of the biological opinion for the Peirson's milkvetch were also...

  16. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  17. A situational analysis of pharmacovigilance plans in the Global Fund Malaria and U.S. President's Malaria Initiative proposals.

    Science.gov (United States)

    Stergachis, Andy; Bartlein, Rebecca J K; Dodoo, Alexander; Nwokike, Jude; Kachur, S Patrick

    2010-05-30

    Pharmacovigilance programmes can monitor and help ensure the safe use of medicines that are critical to the success of global public health programmes. The widespread deployment of artemisinin-based combination therapy (ACT) by national malaria control programmes as part of the overall Global Malaria Action Plan for malaria control to elimination and eradication makes ACT an excellent candidate for pharmacovigilance activities. In 2008, The Roll Back Malaria partnership issued guidelines for inclusion of pharmacovigilance in Global Fund and other related proposals. In light of this recommendation and the rapid scale-up of ACT worldwide, an analysis of Global Fund Round 8 proposals and the President's Malaria Initiative (PMI) 2009 Malaria Operational Plans was conducted to assess if and how pharmacovigilance has been incorporated into countries' national malaria plans and donor budget requests. The Global Fund-Malaria Round 8 proposals for the 26 countries and the PMI Malaria Operational Plans (MOPs) for fiscal year 2009 for the 15 countries that were approved and received funding from either the Global Fund-Malaria Round 8 or PMI were accessed through the programme websites. The analysis consisted of conducting word counts and key word in context analyses of each proposal and plan. Twelve out of 26 (46%) of the Global Fund proposals mentioned that established pharmacovigilance systems were present in their countries. Four of the fifteen PMI MOPs (27%) mentioned that established pharmacovigilance systems were present in their countries. Only seven of the 26 (27%) Global Fund proposals included a request for funding for new or current pharmacovigilance activities. Seven of 15 (47%) MOPs included a request for funding for pharmacovigilance activities. There were relatively few requests for funding for pharmacovigilance activities, demonstrating a lack of emphasis placed on pharmacovigilance systems in recipient countries. The findings stress the need for more active

  18. Evaluating the impact a proposed family planning model would have on maternal and infant mortality in Afghanistan.

    Science.gov (United States)

    Rahmani, Ahmad Masoud; Wade, Benjamin; Riley, William

    2015-01-01

    This study aimed to assess the potential impact a proposed family planning model would have on reducing maternal and infant mortality in Afghanistan. Afghanistan has a high total fertility rate, high infant mortality rate, and high maternal mortality rate. Afghanistan also has tremendous socio-cultural barriers to and misconceptions about family planning services. We applied predictive statistical models to a proposed family planning model for Afghanistan to better understand the impact increased family planning can have on Afghanistan's maternal mortality rate and infant mortality rate. We further developed a sensitivity analysis that illustrates the number of maternal and infant deaths that can be averted over 5 years according to different increases in contraceptive prevalence rates. Incrementally increasing contraceptive prevalence rates in Afghanistan from 10% to 60% over the course of 5 years could prevent 11,653 maternal deaths and 317,084 infant deaths, a total of 328,737 maternal and infant deaths averted. Achieving goals in reducing maternal and infant mortality rates in Afghanistan requires a culturally relevant approach to family planning that will be supported by the population. The family planning model for Afghanistan presents such a solution and holds the potential to prevent hundreds of thousands of deaths. Copyright © 2013 John Wiley & Sons, Ltd.

  19. Proposal for development of a system for planning radiotherapy of gliomas

    International Nuclear Information System (INIS)

    Caldeira, Alexandre D.

    2015-01-01

    In the last three years, discussions were held on several topics in Nuclear Medicine area, starting with the nuclear data processing, passing by deterministic and stochastic mathematical methods, and finalizing with computer simulations of the following phenomena: neutron transport, applied to boron neutron capture therapy, and neutron diffusion, to study growth of tumor cells. From a mathematical model applied to radiotherapy of gliomas available in literature, it is proposed a strategy for development of a computer system to assist the planning radiotherapy of gliomas. (author)

  20. 75 FR 6413 - Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical...

    Science.gov (United States)

    2010-02-09

    ... Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and.... SUMMARY: The NRC is soliciting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' on a proposed Revision 1 to Standard Review Plan (SRP...

  1. Walking the Torque: Proposed Work Plan for Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Electric motor-driven system is the largest single energy end use accounting for more than 40% of global electricity consumption. This paper sets out an ambitious but achievable target with the global work plan to improve the energy efficiency of electric motor-driven system by 10% to 15% based on the finding of working paper ''Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems (Waide et al., 2011)''. If governments commit to the proposed work plan immediately and maintain resourcing levels, this could be achieved by 2030 and it would be equivalent to reducing total global electricity use by around 5%. The proposed work plan of this paper is to align regulatory settings within a globally applicable scheme. The IEA believes this target can only be achieved through global co-operation leading to aligned national policy settings that countries can unlock the economies of scale that will result from using more energy efficient EMDS.

  2. Fact Sheet: Proposed Rule: State Plans to Address Emissions During Startup, Shutdown, and Malfunction (SSM)

    Science.gov (United States)

    On February 12, 2013, the U.S. Environmental Protection Agency (EPA) proposed a rule that would ensure states have plans in place that require industrial facilities across the country to follow air pollution rules during SSM operations.

  3. Proposed site treatment plan (PSTP) Volumes I ampersand II ampersand reference document, Revision 3

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.

    1995-01-01

    The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort to develop Site Treatment Plans for each of its sites generating or storing mixed waste. Mixed waste contains both a hazardous waste subject to the Resource Conservation and Recovery Act and radioactive material subject to the Atomic Energy Act of 1954. The Site Treatment Plan for the Savannah River Site proposes how SRS will treat mixed waste that is now stored on the site and mixed waste that Will be generated in the future. Also, the Site Treatment Plan identifies Savannah River Site mixed wastes that other Department of Energy facilities could treat and mixed waste from other facilities that the Savannah River Site could treat. The Site Treatment Plan has been approved by the State of South Carolina. The Department of Energy Will enter into a consent order with the State of South Carolina by October 6, 1995. The consent order will contain enforceable commitments to treat mixed waste

  4. Proposed plan for the Tank 105-C Hazardous Waste Management Facility. Revision 1

    International Nuclear Information System (INIS)

    Miles, W.C. Jr.

    1994-01-01

    This Proposed Plan was developed to describe the remedial action selected at the Tank 105-C Hazardous Waste Management Facility (HWMF) source-specific unit within the C-Area Fundamental Study Area (FSA) at the Savannah River Site (SRS) and to fulfill Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. This 8,400 gallon capacity tank was certified and accepted closed according to a closure plan approved by the state of South Carolina under the Resource Conservation and Recovery Act (RCRA) authority in January 1991. As a result of the closure, previously performed under RCRA, the unit poses no current or potential threat to human health or the environment. Accordingly, no further remedial action is necessary under CERCLA

  5. 77 FR 33788 - Proposed Post Office Structure Plan

    Science.gov (United States)

    2012-06-07

    ... Plan AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request for an advisory opinion regarding its Post Office Structure Plan... Commission for an advisory opinion under 39 U.S.C. 3661 regarding its Post Office Structure Plan (POStPlan...

  6. Proposed standby gasoline rationing plan. Economic and regulatory analysis draft

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-01

    This economic and regulatory analysis meets the requirements of the Energy Policy and Conservation Act, which calls for an evaluation of the potential economic impacts of the gasoline rationing contingency plan. In addition, this analysis is intended to satisfy the requirements of the President's Executive Order No. 12044 of March 23, 1978, regarding government regulations, and provides an inflationary impact statement for the proposed rationing plan. To perform the analysis of rationing program impacts on the total national economy, three separate projections were required. First, a projection is made of the ''normal'' U.S. economy for a future period--the last quarter of 1980 through the third quarter of 1981 in this analysis. Second, a projection is made of the impacts which a petroleum supply interruption would have on the U.S. economy during this future period, assuming that DOE's standby allocation and price control regulations were implemented for crude oil and products. Third, and most significant, an estimate is made of the incremental impacts of the gasoline rationing program on this already-perturbed future U.S. economy.

  7. 30 CFR 250.251 - If I propose activities in the Alaska OCS Region, what planning information must accompany the DPP?

    Science.gov (United States)

    2010-07-01

    ... Region, what planning information must accompany the DPP? 250.251 Section 250.251 Mineral Resources... Region, what planning information must accompany the DPP? If you propose development and production activities in the Alaska OCS Region, the following planning information must accompany your DPP: (a...

  8. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-051552, LLCAD0700 L51010000 FX0000 LVRWB10B3980] Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior...

  9. Proposed plan for remedial action at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    1992-11-01

    This proposed plan addresses the management of contaminated material at the chemical plant area of the Weldon Spring site and nearby properties in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry, both of which are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced at the chemical plant in the 1940s, and uranium and thorium materials were processed in the 1950s and 1960s. Various liquid, sludge, and solid wastes were disposed of at the Chemical plant area and in the quarry during that time. The Weldon Spring site is listed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The proposed plan is organized as follows: Chapter 2 presents the history and setting of the Weldon Spring site and briefly describes the contaminated material at the chemical plant area. Chapter 3 defines the scope of the remedial action and its role in the Weldon Spring Site Remedial Action Project. Chapter 4 summarizes the risks associated with possible exposures to site contaminants in the absence of remedial action and identifies proposed cleanup levels for soil. Chapter 5 briefly describes the final alternatives considered for the remedial action. Chapter 6 summarizes the evaluation of final alternatives for managing the contaminated material, identifies the currently preferred alternative, and discusses a possible contingency remedy to provide treatment flexibility. Chapter 7 presents the community's role in this action. Chapter 8 is a list of the references cited in this proposed plan

  10. 30 CFR 250.220 - If I propose activities in the Alaska OCS Region, what planning information must accompany the EP?

    Science.gov (United States)

    2010-07-01

    ... Region, what planning information must accompany the EP? 250.220 Section 250.220 Mineral Resources... activities in the Alaska OCS Region, what planning information must accompany the EP? If you propose exploration activities in the Alaska OCS Region, the following planning information must accompany your EP: (a...

  11. 77 FR 16541 - Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy...

    Science.gov (United States)

    2012-03-21

    ...). Grants are made to Institutions of Higher Education that have entered into consortium arrangements with... DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy Development; Case Studies of Current and Former Grantees of the Title III National...

  12. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  13. Proposal plan of classification faceted for federal universities

    Directory of Open Access Journals (Sweden)

    Renata Santos Brandão

    2017-09-01

    Full Text Available This study aims to present a faceted classification plan for the archival management of documents in the federal universities of Brazil. For this, was done a literature review on the archival management in Brazil, the types of classification plans and the theory of the Ranganathan faceted classification, through searches in databases in the areas of Librarianship and Archivology. It was identified the classification plan used in the Federal Institutions of Higher Education to represent the functional facet and created the structural classification plan to represent the structural facet. The two classification plans were inserted into a digital repository management system to give rise to the faceted classification plan. The system used was Tainacan, free software wordpress-based used in digital document management. The developed faceted classification plan allows the user to choose and even combine the way to look for the information that guarantees agreater efficiency in the information retrieval.

  14. 17 CFR 229.1006 - (Item 1006) Purposes of the transaction and plans or proposals.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false (Item 1006) Purposes of the transaction and plans or proposals. 229.1006 Section 229.1006 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION STANDARD INSTRUCTIONS FOR FILING FORMS UNDER SECURITIES ACT OF 1933, SECURITIES EXCHANGE ACT OF 1934 AND ENERGY POLICY...

  15. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  16. 77 FR 36287 - Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander, Calaveras...

    Science.gov (United States)

    2012-06-18

    ...-FXES11120800000F2-123-F2] Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander... animal, the threatened Central California Distinct Population Segment of the California tiger salamander (tiger salamander). The applicant would implement a conservation program to minimize and mitigate the...

  17. 78 FR 9028 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan

    Science.gov (United States)

    2013-02-07

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2010-0086] Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and... Brucella suis, causes loss of young through spontaneous abortion or birth of weak offspring, reduced...

  18. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-01-01

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site's preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised

  19. 34 CFR 97.118 - Applications and proposals lacking definite plans for involvement of human subjects.

    Science.gov (United States)

    2010-07-01

    ... Education PROTECTION OF HUMAN SUBJECTS Federal Policy for the Protection of Human Subjects (Basic ED Policy for Protection of Human Research Subjects) § 97.118 Applications and proposals lacking definite plans..., or contracts are submitted to departments or agencies with the knowledge that subjects may be...

  20. 76 FR 31381 - Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

    Science.gov (United States)

    2011-05-31

    ... Standard Review Plan; Section 8.1 on Electric Power--Introduction AGENCY: U.S. Nuclear Regulatory...,'' on a proposed Revision 4 to Standard Review Plan (SRP), Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111180542). The previous version of...

  1. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  2. 76 FR 2135 - Office of Juvenile Justice and Delinquency Prevention Proposed Plan for Fiscal Year 2011

    Science.gov (United States)

    2011-01-12

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1544] Office of Juvenile Justice and Delinquency Prevention Proposed Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention, Office of Justice Programs, Department of Justice...

  3. Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit (631-18G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-07-01

    This Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit is issued by the U.S. Department of Energy, the lead agency for the Savannah River Site remedial activities, with concurrence by the U.S. Environmental Protection Agency - Region IV, and the South Carolina Department of Health and Environmental Control

  4. Management plan for the procurement of shipping casks required to service proposed federal waste repositories

    International Nuclear Information System (INIS)

    Renken, J.H.; Dupree, S.A.; Allen, G.C. Jr.; Freedman, J.M.

    1978-08-01

    Development of transportation systems to move radioactive waste and unreprocessed spent fuel to proposed federal waste repositories is an integral part of the National Waste Terminal Storage Program. To meet this requirement, shipping casks must be designed, licensed, and fabricated. To assist the manager charged with this responsibility, a Cask Procurement Plan has been formulated. This plan is presented as a logic diagram that is suitable for computer analysis. In addition to the diagram, narrative material that describes various activities in the plan is also included. A preliminary computer analysis of the logic diagram indicates that, depending on the result of several decisions which must be made during the course of the work, the latest start dates which will allow prototype delivery of all types of casks by December 1985, range from November 1977 to March 1982

  5. 75 FR 47619 - Notice of Availability of the Proposed California Desert Conservation Area Plan Amendment and...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-48668, 49502, 49503, 49504, LLCAD09000.L51010000.FX0000, LVRWB09B2400] Notice of Availability of the Proposed California Desert Conservation Area Plan Amendment and Final Environmental Impact Statement for the Ivanpah Solar Electric Generating...

  6. Forest planning at territory level: a methodological proposal

    Directory of Open Access Journals (Sweden)

    Agnoloni S

    2009-05-01

    Full Text Available This paper describes goals and methodologies of the Land Plan for Forest and Natural Environment Management Guidance (PFTI stemming from the Ri.Selv.Italia national project (within the “Forest Land Planning” 4.2 subproject. The PFTI geographic range of application is at an intermediate level between single forest-management-unit-level plan and regional forest plans, and deals with forest and pastures resources management. PFTI’s main purposes concern forest resource and forest economy analysis and assessment of the benefits that can be provided to local population through a rational forest management, taking into account also the social structure and potential local conflicts. PFTI’s final task is then to weigh up all these issues in order to give specific participated forest management guidelines at a territorial scale. Unlike the forest-management-unit-level plan, whose specific duties are predetermined and fixed, the PFTI is not necessarily a mandatory plan. On the opposite, PFTI should suggest several specific silviculture guidelines and alternative management scenarios.

  7. Expanding Canada Pension Plan Retirement Benefits: Assessing Big CPP Proposals

    Directory of Open Access Journals (Sweden)

    Jonathan R. Kesselman

    2010-10-01

    Full Text Available Current and growing deficiencies in many workers’ ability to maintain their accustomed living standards in retirement have evoked varied proposals for reform of Canada’s retirement income system. This study focuses on proposals for expanding the retirement benefits of the Canada Pension Plan (CPP, and undertakes comparative analysis with proposals for reforms affecting workplace pensions and individual savings. It begins by reviewing key policy questions for the retirement income system and describing essential features of several proposals for CPP benefit expansion. It then uses these “Big CPP” proposals as a basis to assess the design issues for expanding CPP benefits and the implications for other components of the retirement income system. The paper assesses each of the major private and public savings vehicles based on multifaceted criteria for a well-performing retirement income system; a mandatory public scheme with defined benefits ranks most highly on almost all criteria other than individual flexibility. Additional behavioural and institutional factors also support the use of mandatory public pensions: myopia in savings, individual investment behaviour, scale economies and costs of fund management, adverse selection and annuitization costs, the Samaritan’s Dilemma, and labour market incentives. The study provides an overview analysis of key design issues for the expansion of CPP retirement benefits. Major issues include the desirable scale of expansion for both the percentage of insurable earnings and the insurable earnings ceiling; mandatory versus voluntary coverage and options; the allocation of investment return risk; and the phasing-in of higher premiums and benefits. The study then assesses the implications of CPP expansion for other components of the retirement income system: Old Age Security and the Guaranteed Income Supplement, workplace pensions, tax provisions for savings, and individual savings. A Big CPP fits

  8. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  9. Clinical trials recruitment planning: A proposed framework from the Clinical Trials Transformation Initiative.

    Science.gov (United States)

    Huang, Grant D; Bull, Jonca; Johnston McKee, Kelly; Mahon, Elizabeth; Harper, Beth; Roberts, Jamie N

    2018-03-01

    Patient recruitment is widely recognized as a key determinant of success for clinical trials. Yet a substantial number of trials fail to reach recruitment goals-a situation that has important scientific, financial, ethical, and policy implications. Further, there are important effects on stakeholders who directly contribute to the trial including investigators, sponsors, and study participants. Despite efforts over multiple decades to identify and address barriers, recruitment challenges persist. To advance a more comprehensive approach to trial recruitment, the Clinical Trials Transformation Initiative (CTTI) convened a project team to examine the challenges and to issue actionable, evidence-based recommendations for improving recruitment planning that extend beyond common study-specific strategies. We describe our multi-stakeholder effort to develop a framework that delineates three areas essential to strategic recruitment planning efforts: (1) trial design and protocol development, (2) trial feasibility and site selection, and (3) communication. Our recommendations propose an upstream approach to recruitment planning that has the potential to produce greater impact and reduce downstream barriers. Additionally, we offer tools to help facilitate adoption of the recommendations. We hope that our framework and recommendations will serve as a guide for initial efforts in clinical trial recruitment planning irrespective of disease or intervention focus, provide a common basis for discussions in this area and generate targets for further analysis and continual improvement. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  10. Bedfordshire County Structure Plan. Proposed alterations. Results of public consultation. Policy 97: Nuclear waste

    International Nuclear Information System (INIS)

    1984-01-01

    The document refers to Alterations to the County Structure Plan, proposed by Bedfordshire County Council and submitted to the Secretary of State for the Environment. An additional Alteration initiated at the County Council's meeting, dealing with nuclear waste, had not been the subject of prior public consultation. Consultation had since been arranged, and the present document summarises the responses that have been received, and describes the next action to be taken. (U.K.)

  11. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  12. Proposal for a strategic planning for the replacement of products in stores based on sales forecast

    Directory of Open Access Journals (Sweden)

    Cassius Tadeu Scarpin

    2011-08-01

    Full Text Available This paper presents a proposal for strategic planning for the replacement of products in stores of a supermarket network. A quantitative method for forecasting time series is used for this, the Artificial Radial Basis Neural Networks (RBFs, and also a qualitative method to interpret the forecasting results and establish limits for each product stock for each store in the network. The purpose with this strategic planning is to reduce the levels of out-of-stock products (lack of products on the shelves, as well as not to produce overstocking, in addition to increase the level of logistics service to customers. The results were highly satisfactory reducing the Distribution Center (DC to shop out-of-stock levels, in average, from 12% to about 0.7% in hypermarkets and from 15% to about 1.7% in supermarkets, thereby generating numerous competitive advantages for the company. The use of RBFs for forecasting proved to be efficient when used in conjunction with the replacement strategy proposed in this work, making effective the operational processes.

  13. 77 FR 64311 - Potential Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense...

    Science.gov (United States)

    2012-10-19

    ... actually be associated with the two material research and development projects will depend on the market... Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense Stockpile Market... Stockpile Market Impact Committee, co-chaired by the Departments of Commerce and State, is seeking public...

  14. 76 FR 41811 - Kellaway Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, San Luis...

    Science.gov (United States)

    2011-07-15

    ...] Kellaway Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, San Luis Obispo... species in the community of Los Osos, San Luis Obispo County, California. The applicants would implement a... Los Osos, San Luis Obispo County, California. The applicants are requesting a permit for take of Morro...

  15. Plan Repair as an Extension of Planning

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    In dynamic environments, agents have to deal with changing situations. In these cases, repairing a plan is often more efficient than planning from scratch, but existing planning techniques are more advanced than existing plan repair techniques. Therefore, we propose a straightforward method to

  16. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    1987-08-01

    This report was prepared to illustrate the policy and actions that the State of Nevada believe are required to assure that the quality of the environment is adequately considered during the course of the DOE work at the proposed high-level nuclear waste repository at Yucca Mountain. The report describes the DOE environmental program and the studies planned by NWPO to reflect the State's position toward environmental protection. 41 refs., 2 figs., 11 tabs

  17. Crown and crown-root fractures: an evaluation of the treatment plans for management proposed by 154 specialists in restorative dentistry.

    Science.gov (United States)

    de Castro, Mara Antonio Monteiro; Poi, Wilson Roberto; de Castro, José Carlos Monteiro; Panzarini, Sônia Regina; Sonoda, Celso Koogi; Trevisan, Carolina Lunardelli; Luvizuto, Eloá Rodrigues

    2010-06-01

    Traumatic tooth injuries involve function and aesthetics and cause damage that range from minimal enamel loss to complex fractures involving the pulp tissue and even loss of the tooth crown. Technical knowledge and clinical experience are essential to establish an accurate diagnosis and provide a rational treatment. The purpose of this study was to evaluate the knowledge of Restorative Dentistry specialists about the management of crown and crown-root fractures based on treatment plans proposed by these professionals for these cases. A descriptive questionnaire was mailed to 245 Restorative Dentistry specialists with questions referring to their professional profile and the treatment plans they would propose for the management of crown and crow-root fractures resulting from dental trauma. One hundred and fifty-four questionnaires were returned properly filled. The data were subjected to descriptive statistics and the chi-square test was used to determine the frequency and the level of the significance among the variables. The analysis of data showed that in spite of having a specialist title, all interviewees had great difficulty in planning the treatments. As much as 42.8% of the participants were unable to treat all types of dental trauma. Complicated and uncomplicated crown-root fractures posed the greatest difficulties for the dentists to establish adequate treatment plans because these fractures require multidisciplinary knowledge and approach for a correct case planning and prognosis.

  18. 78 FR 35951 - Proposed Low-Effect Habitat Conservation Plan for the City of Santa Cruz Graham Hill Water...

    Science.gov (United States)

    2013-06-14

    ...] Proposed Low-Effect Habitat Conservation Plan for the City of Santa Cruz Graham Hill Water Treatment Plant... grasshopper (Trimerotropis infantilis), and will address associated impacts and conservation measures for the... lawful activities associated with the operation and maintenance of the existing Graham Hill Water...

  19. General Electric Company proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The general requirements and methods for instrumenting, testing, and evaluating solar HVAC systems forming a part of ERDA's ''Commercial Demonstration Program'' commensurate with ERDA 23A and the Proposed Management Plan 75SDS4270 are defined. Design requirements are specified for the performance of components and subsystems comprising the instrumentation and data gathering system, as well as the support functions required to perform the diagnostic measurements, collection and processing of data, and documentation of reports on solar HVAC system performance, including economic and societal evaluations.

  20. Statement of Basis/Proposed Plan for the P-Area Burning Rubble Pit (131-P)

    International Nuclear Information System (INIS)

    Bland, T.

    2002-01-01

    The Statement of Basis/Proposed Plan (SB/PP) is being issued by the United States Department of Energy (USDOE), which functions as the lead agency for Savannah River Site (SRS) remedial activities, with concurrence by the United States Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this SB/PP is to describe the preferred remedial alternatives for the P-Area Burning/Rubble Pit (131-P) (PBRP) Operable Unit (OU) and to provide for public involvement in the decision-making process

  1. Tax planning differences from tax avoidance

    OpenAIRE

    Bajorinaitė, Rasa

    2007-01-01

    Pagrindinis magistro darbo tikslas – nubrėžti ribą tarp mokesčių planavimo ir mokesčių vengimo, todėl visapusiškai nagrinėjamos mokesčių planavimo ir vengimo sąvokas, požymiai bei mokesčių vengimo prevencijos priemonės. Šiame darbe pateikiama teisėto mokesčių planavimo proceso schema: mokesčių planavimo etapai, pagrindiniai principai ir galimi teisėti mokestinės naštos sumažinimo būdai. Kadangi teisėtu gali būti pripažintas tik toks mokesčių planavimas, kuris neatitinka mokesčių vengimą draud...

  2. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  3. 78 FR 42027 - Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements

    Science.gov (United States)

    2013-07-15

    ... Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements AGENCY: Employee... illustrations given to participants in defined contribution pension plans, such as 401(k) and 403(b) plans. The... Labor, 200 Constitution Avenue NW., Washington, DC 20210, Attention: Pension Benefit Statements Project...

  4. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  5. 31 CFR 31.200 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... addresses actual and potential conflicts of interest that may arise from contracts and financial agency agreements between private sector entities and the Treasury for services under the TARP, other than administrative services identified by TARP Chief Compliance Officer. ...

  6. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada: Volume 1

    International Nuclear Information System (INIS)

    1987-08-01

    Environmental protection during the course of siting and constructing a repository is mandated by NWPA in conjunction with various phases of repository siting and development. However, DOE has issued no comprehensive, integrated plan for environmental protection. Consequently, it is unclear how DOE will accomplish environmental assessment, monitoring, impact mitigation, and site reclamation. DOE should, therefore, defer further implementation of its current characterization program until a comprehensive environmental protection plan is available. To fulfill its oversight responsibilities the State of Nevada has proposed a comprehensive environmental program for the Yucca Mountain site that includes immediately undertaking studies to establish a 12-month baseline of environmental information at the site; adopting the DOE Site Characterization Plan (SCP) and the engineering design plans it will contain as the basis for defining the impact potential of site characterization activities; using the environmental baseline and the SCP to evaluate the efficacy of the preliminary impact analyses reported by DOE in the EA; using the SCP as the basis for discussions with federal, state, and local regulatory authorities to decide which environmental requirements apply and how they can be complied with; using the SCP, the EA impact review, and the compliance requirements to determine the scope of reclamation measures needed; and developing environmental monitoring and impact mitigation plans based on the EA impact review, compliance requirements, and anticipated reclamation needs

  7. 76 FR 45606 - Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan...

    Science.gov (United States)

    2011-07-29

    ...-N131; 80221-1112-80221-F2] Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan Amendment, Southern California: Environmental Impact Statement AGENCY: Fish and..., as amended, for the proposed Desert Renewable Energy Conservation Plan (DRECP). The EIS will be a...

  8. Implementation plan of the environmental impact statement on a proposed policy for acceptance of foreign research reactor spent nuclear fuel

    International Nuclear Information System (INIS)

    Matos, J.E.

    1996-01-01

    This paper provides a summary of selected portions of the United States Department of Energy's ''Implementation Plan for the Environmental Impact Statement on a Proposed Policy for Acceptance of Foreign Research Reactor Spent Nuclear Fuel'', DOE/EIS-0218, October 1994

  9. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    Science.gov (United States)

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  10. PROPOSED CHANGES TO TAX LAW IN SOUTH AFRICA: INTEREST-FREE LOANS AS A TOOLIN ESTATE PLANNING?

    Directory of Open Access Journals (Sweden)

    M. J. Preston

    2016-07-01

    Full Text Available Estate planning often involves the sale of an asset by an estate planner (the ownerof the asset to aninter vivostrust, as a related family trust. It also often happensthat the buying trust does not have the necessary funds to pay the purchase price.In this situation it is common practice to finance the sale by means of an interest-free loan agreement. The buying trust becomes the owner of the property, whilethe purchase price remains due and payable to the seller, without the loan amountaccruing interest. The result achieved by the estate planner is that potential furthergrowth of the asset soldis shifted to thetrust, resulting in an estate duty benefit forthe seller. The debate surrounding the use of the interest-free loan as an estateplanning tool has been polarised for years with most researchers concluding thatthe interest-free loan remains a useful estate planning tool. Doubts regarding theuse of such agreements and the trust for estate planning have recently neemrenewed. Since 2013, several statements by the different Ministers of Finance, intheir respective budget speeches, indicated that governmentwill propose taxavoidance legislation that will directly impact the taxation of trusts and connectedparties to a trust. This study will focus on the effect which the recent proposedchanges to the Income Tax Act (58 of 1962 might have on the use of interest-freeloans as an estate planning tool. The study is qualitative in nature with documentanalysis at its core. The main aim is to provide more clarity to estate planners inthis regard. The research concludes that the interest-free loan still has someadvantage as an estate planning tool, but if estate planning is done with only taxplanning and tax savings as motivation, that advantagemay disappear.

  11. Proposed plan for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-03-01

    The US Department of Energy (DOE) in compliance with Section 117(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, is releasing the proposed plan for remedial action at the United Nuclear Corporation (UNC) Disposal Site located at the DOE Oak Ridge Operations (ORO) Y-12 Plant, Oak Ridge, Tennessee. The purpose of this document is to present and solicit for comment to the public and all interested parties the ''preferred plan'' to remediate the UNC Disposal Site. However, comments on all alternatives are invited

  12. Preservation of information about the repository for spent nuclear fuels - proposal for action plan; Bevarande av information om slutfoervar foer anvaent kaernbraensle - foerslag till handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina (Vattenfall Power Consultant AB, Stockholm (Sweden))

    2008-10-15

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  13. Coincident Aerosol and H2O Retrievals versus HSI Imager Field Campaign ReportH2O Retrievals versus HSI Imager Field Campaign Report

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Gail P. [National Oceanic and Atmospheric Administration (NOAA), Washington, DC (United States); Cipar, John [Air Force Research Lab. (AFRL), Wright-Patterson AFB, OH (United States); Armstrong, Peter S. [Air Force Research Lab. (AFRL), Wright-Patterson AFB, OH (United States); van den Bosch, J. [Air Force Research Lab. (AFRL), Wright-Patterson AFB, OH (United States)

    2016-05-01

    Two spectrally calibrated tarpaulins (tarps) were co-located at a fixed Global Positioning System (GPS) position on the gravel antenna field at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility’s Southern Great Plains (SGP) site. Their placement was timed to coincide with the overflight of a new hyperspectral imaging satellite. The intention was to provide an analysis of the data obtained, including the measured and retrieved spectral albedos for the calibration tarps. Subsequently, a full suite of retrieved values of H2O column, and the aerosol overburden, were to be compared to those determined by alternate SGP ground truth assets. To the extent possible, the down-looking cloud images would be assessed against the all-sky images. Because cloud contamination above a certain level precludes the inversion processing of the satellite data, coupled with infrequent targeting opportunities, clear-sky conditions were imposed. The SGP site was chosen not only as a target of opportunity for satellite validation, but as perhaps the best coincident field measurement site, as established by DOE’s ARM Facility. The satellite team had every expectation of using the information obtained from the SGP to improve the inversion products for all subsequent satellite images, including the cloud and radiative models and parameterizations and, thereby, the performance assessment for subsequent and historic image collections. Coordinating with the SGP onsite team, four visits, all in 2009, to the Central Facility occurred: • June 6-8 (successful exploratory visit to plan tarp placements, etc.) • July 18-24 (canceled because of forecast for heavy clouds) • Sep 9-12 (ground tarps placed, onset of clouds) • Nov 7-9 (visit ultimately canceled because of weather predictions). As noted, in each instance, any significant overcast prediction precluded image collection from the satellite. Given the long task-scheduling procedures

  14. FACTORS AFFECTING FINANCIAL CONSUMERS’ PRIVATE PENSION PLAN DECISIONS: A LITERATURE REVIEW AND A CONCEPTUAL FRAMEWORK PROPOSAL

    Directory of Open Access Journals (Sweden)

    Aslı Elif Aydın

    2016-08-01

    Full Text Available The objective of this study is to propose a framework related to financial consumers’ private pension plan decisions. Specifically, we review the factors affecting consumers’ participation, contribution and asset allocation decisions regarding private pensions. The factors discussed include situational and dispositional factors, personality, motivation, financial literacy, and external influences. Based on this survey of literature, we develop a number of propositions, which are expected to benefit individual retirement planners and pension institutions in gaining a better understanding of retirement saving decisions.

  15. Wetland Planning: Current Problems and Environmental Management Proposals at Supra-Municipal Scale (Spanish Mediterranean Coast

    Directory of Open Access Journals (Sweden)

    María-Teresa Sebastiá-Frasquet

    2014-03-01

    Full Text Available The policies that define the use and management of wetlands in Spain have undergone tremendous changes in recent decades. During the period of 1950–1980, Land Reform Plans promoted filling and draining of these areas for agricultural use. In 1986, with the incorporation of Spain to the European Union (EU, there was a sudden change of direction in these policies, which, thereafter, pursued restoring and protecting these ecosystems. This change, combined with increasing urban development and infrastructure pressures (e.g., roads, golf courses, etc., creates a conflict of uses which complicates the management of these ecosystems by local governments. This study analyzes the effectiveness of policies and management tools of important coastal wetlands at the local scale in the Valencian Community (Western Mediterranean Sea using a strengths-weaknesses-opportunities-threats (SWOT methodology. A supra-municipal model of environmental planning is proposed to enable consistent management at a regional scale. This model enhances local government’s effectiveness and it can be applied in other areas with similar problems.

  16. Proposing and Planning the Rehabilitation Works of Mechanical Utility System in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Jusnan Hasim; Mohamad Suhaimi Yahaya; Abdul Razak Hashim

    2015-01-01

    Nuclear Malaysia has 2 complex located in Bangi and Jalan Dengkil. The utility in Nuclear Malaysia consists of civil, mechanical and electrical system that has been managed by Bahagian Kejuruteraan (BKJ). The mechanical utilities system has been divided to three main groups which are the main system, supporting system and safety equipment's. The objectives of this paper are to propose and plan the rehabilitation works of mechanical utility system in Nuclear Malaysia and also to explain working procedures in maintaining and repairing the mechanical utility system. The study suggest the rehabilitation works on the mechanical utilities system especially on Thermal Energy Storage (TES) and domestic water system needs to be done which involve process of design, procurement, installation and commissioning. (author)

  17. Perspectives of personality assessment: relations between five-factor model and "profile xt"

    OpenAIRE

    Rutkauskaitė, Aistė

    2014-01-01

    Asmenybės vertinimo galimybės: ryšys tarp Penkių faktorių modelio ir „Profile XT“ Santrauka Asmenybės klausimynai asmenybę vertina nomotetiniu būdu: asmeninės savybės yra lyginamos tarp žmonių ir ieškoma jų bendrumų, bet tyrinėtojas nesigilina į to paties žmogaus savybių dinamiką. Tarp asmenybės bruožų teorijų šiuo metu populiariausias ir daug dėmesio sulaukiantis Penkių faktorių modelis teigia, kad asmenybę išsamiai apibūdina šie faktoriai: Neurotiškumas, Ekstraversija, Atvirumas patyrimui, ...

  18. Interim Action Proposed Plan for the old radioactive waste burial ground (643-E)

    International Nuclear Information System (INIS)

    McFalls, S.

    1995-12-01

    This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this IAPP is to describe the preferred interim remedial action for addressing the Old Radioactive Waste Burial Ground (ORWBG) unit located in the Burial Ground Complex (BGC) at the Savannah River Site (SRS) in Aiken, South Carolina. On December 21, 1989, SRS was included on the National Priorities List (NPL). In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), DOE has negotiated a Federal Facility Agreement (FFA, 1993) with EPA and SCDHEC to coordinate remedial activities at SRS. Public participation requirements are listed in Sections 113 and 117 of CERCLA. These requirements include establishment of an Administrative Record File that documents the selection of remedial alternatives and allows for review and comment by the public regarding those alternatives. The SRS Public Involvement Plan (PIP) (DOE, 1994) is designed to facilitate public involvement in the decision-making process for permitting closure, and the selection of remedial alternatives. Section 117(a) of CERCLA, 1980, as amended, requires publication of a notice of any proposed remedial action

  19. Installation Restoration Program. Ohio Air National Guard, Toledo Express Airport, Swanton, Ohio. Site Investigation Work Plan

    Science.gov (United States)

    1990-09-01

    Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using

  20. Proposal of a nuclear cycle research and development plan in Tokai works. The roadmap from LWR cycle to FBR cycle

    International Nuclear Information System (INIS)

    Nakamura, Hirofumi; Abe, Tomoyuki; Kashimura, Takuo; Nagai, Toshihisa; Maeda, Seichiro; Yamaguchi, Toshiya; Kuroki, Ryoichiro

    2003-07-01

    The Generation-II Project Task Force Team has investigated a research and development plan of a future nuclear fuel cycle in Tokai works for about three months from December 19, 2002. First we have discussed about the present condition of Japanese nuclear fuel cycle and have recognized it as the following. The relation of the technology between the LWR-cycle and the FBR-cycle is not clear. MOX Fuel Use in Light Water Reactors is important to establish technology of the FBR fuel cycle. Radioactive waste disposal issue is urgent. Next we have proposed the three basic policies on R and D plan of nuclear fuel cycle in consideration of the F.S. on FBR-cycle. Establishment and advancement of 'the tough nuclear fuel cycle'. Early establishment of the FBR cycle technology to be able to supply energy stably for long-term. Establishment of the radioactive waste treatment and disposal technology, and optimization of nuclear fuel cycle technology from the viewpoint of radioactive waste. And we have proposed the Japanese technical holder system to integrate all LWR and FBR cycle technology. (author)

  1. Proposal for a procedure to plan an inventory process at Herradura Hotel

    Directory of Open Access Journals (Sweden)

    Yoaima Dickinson González

    2009-12-01

    Full Text Available Today, like years ago, Cuba is involved in a continuous struggle to improve the economy in its numerous sectors withspecific emphasis in tourism industry, which has globally evolved as one of the most increasing phenomena. Cuba,not being exerted from that situation, has placed it as the engine of the economy based on a previous redirection of itseconomic strategy. For this reason, it is necessary to search new managerial alternatives and theories contributing to thisdevelopment. In particular, finance management catches a great attention as a function of enterprise administration, asit is in charge of managing the productive resources in such a way that the organization meets the expected economicand financial results: more efficiency, less risk involved and higher profitability. This important function affects considerablydecision making process in terms of: maintaining appropriate cash flow levels, types of terms of credit to offerto clients or cost-effective inventory levels. All these arguments have led to the main purpose of this investigation andthat is to propose a procedure for inventory planning in hotelier organizations.

  2. Planning for design quality

    International Nuclear Information System (INIS)

    Marguglio, B.W.

    1977-01-01

    In the nuclear industry and in other high technology industries in which the Government serves as either a customer or a regulator, it is almost always required that the contractor prepare a Quality Program Plan sometimes also referred to as a Quality Program Index. Often, the Quality Program Plan is included as part of the contractor's proposal in response to the Government's or a prime contractor's Request for Proposal. At this stage, the Quality Program Plan serves to demonstrate to the prospective customer the availability of the various quality systems. It provides the customer with a commitment as to the use of these quality systems, thus giving greater assurance that the customer's overall quality and design requirements can be met. The Quality Program Plan is contributing to the salability of the proposal. 1 ref

  3. Monitoring plan for long-term environmental measurements at the proposed Douglas Point Ecological Laboratory, Nanjemoy, Maryland

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.S.; Nugent, A.

    1979-01-01

    The Douglas Point Ecological Laboratory has been set up at the site of a proposed power plant, which is to be powered by either nuclear, coal, or an alternate form of fuel. A plan for long-range monitoring of terrestrial ecosystems and atmospheric chemistry is presented. A site characterization study will be made initially. Chemical and physical soil profiles will be established with continuous measurement of soil moisture and nutrient content, as well as other parameters. Data sets will be established, reflecting changes in rainfall pH and rate of deposition through precipitation and dryfall sedimentation of Ca 2+ , Mg 2+ , K + , Na + , SO 4 3- , Cl - , NH 4 + , and NO 3 - . Among other objectives are the development of new monitoring techniques that can be used to trace energy flow, nutrient transport, and radionuclide transport through all trophic levels to selected carnivores. The atmospheric monitoring plan is outlined as to system design and specifications; system installation, operation, and maintenance, data processing and reports; quality assurance program; and project organization. A discussion of administrative and operational monitoring costs is included

  4. Consumer value creation in strategic marketing planning process by the example of kaunas fitness and wellness centers

    OpenAIRE

    Lukašenkinaitė, Monika

    2014-01-01

    Lietuvoje sunkmečio laikotarpiu kiekviena organizacija privalo įsigilinti į savo vartotojo poreikius bei efektyviai juos tenkinti, todėl strateginį marketingo planavimą nagrinėsime vertės vartotojui kurimo aspektu. Sporto paslaugas teikiančių įmonių sektoriuje per pastaruosius kelerius metus įvyko daug pokyčių, tarp jų: technologiniai pokyčiai, dalyvavimo sporto veikloje augimas ir kt. Kiekviena sporto sporto paslaugas teikianti įmonė, norėdama efektyviai vykdyti savo veiklą, privalo atsižvel...

  5. Proposed research and development plan for mixed low-level waste forms

    Energy Technology Data Exchange (ETDEWEB)

    O`Holleran, T.O.; Feng, X.; Kalb, P. [and others

    1996-12-01

    The objective of this report is to recommend a waste form program plan that addresses waste form issues for mixed low-level waste (MLLW). The report compares the suitability of proposed waste forms for immobilizing MLLW in preparation for permanent near-surface disposal and relates them to their impact on the U.S. Department of Energy`s mixed waste mission. Waste forms are classified into four categories: high-temperature waste forms, hydraulic cements, encapsulants, and specialty waste forms. Waste forms are evaluated concerning their ability to immobilize MLLW under certain test conditions established by regulatory agencies and research institutions. The tests focused mainly on leach rate and compressive strength. Results indicate that all of the waste forms considered can be tailored to give satisfactory performance immobilizing large fractions of the Department`s MLLW inventory. Final waste form selection will ultimately be determined by the interaction of other, often nontechnical factors, such as economics and politics. As a result of this report, three top-level programmatic needs have been identified: (1) a basic set of requirements for waste package performance and disposal; (2) standardized tests for determining waste form performance and suitability for disposal; and (3) engineering experience operating production-scale treatment and disposal systems for MLLW.

  6. Proposed research and development plan for mixed low-level waste forms

    International Nuclear Information System (INIS)

    O'Holleran, T.O.; Feng, X.; Kalb, P.

    1996-12-01

    The objective of this report is to recommend a waste form program plan that addresses waste form issues for mixed low-level waste (MLLW). The report compares the suitability of proposed waste forms for immobilizing MLLW in preparation for permanent near-surface disposal and relates them to their impact on the U.S. Department of Energy's mixed waste mission. Waste forms are classified into four categories: high-temperature waste forms, hydraulic cements, encapsulants, and specialty waste forms. Waste forms are evaluated concerning their ability to immobilize MLLW under certain test conditions established by regulatory agencies and research institutions. The tests focused mainly on leach rate and compressive strength. Results indicate that all of the waste forms considered can be tailored to give satisfactory performance immobilizing large fractions of the Department's MLLW inventory. Final waste form selection will ultimately be determined by the interaction of other, often nontechnical factors, such as economics and politics. As a result of this report, three top-level programmatic needs have been identified: (1) a basic set of requirements for waste package performance and disposal; (2) standardized tests for determining waste form performance and suitability for disposal; and (3) engineering experience operating production-scale treatment and disposal systems for MLLW

  7. Resilience and Renewable Energy Planning in Greenland

    DEFF Research Database (Denmark)

    Carruth, Susan

    2014-01-01

    Using a combination of thematic analysis and studio-based planning proposals in West Greenland, this paper proposes that there is more than one interpretation of resilience in renewable energy planning. All energy transitions, from one system to another, are protracted and unpredictable, and the ......Using a combination of thematic analysis and studio-based planning proposals in West Greenland, this paper proposes that there is more than one interpretation of resilience in renewable energy planning. All energy transitions, from one system to another, are protracted and unpredictable......, and the transition to a renewable energy system is proving no exception. Such a transition is particularly amplified in the context of Greenland – a country undergoing rapid transformation in many fields, including energy. Resilience theory offers an approach for how to plan for this energy transition, but how...... to translate resilience theory into planning practices remains underdeveloped. The paper begins by outlining some of the challenges in planning a transition to renewable energy, and sketching Greenland’s energy landscape. It then discusses the key characteristics of resilience thinking, before proposing...

  8. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  9. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  10. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  11. Energetic models: a proposal of integrated planning; Modelos energeticos: uma proposta de planejamento integrado

    Energy Technology Data Exchange (ETDEWEB)

    Pereira Junior, Amaro Olimpio; Soares, Jeferson Borghetti; Araujo, Mauro Almeida [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil)]. E-mails: amaro.pereira@epe.gov.br; jeferson.soares@epe.gov.br; mauro.almeida@epe.gov.br; La Rovere, Emilio Lebre [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia. Programa de Planejamento Estrategico]. E-mail: emilio@ppe.ufrj.br; Costa, Ricardo Cunha da [Banco Nacional de Desenvolvimento Economico e Social (BNDES), Rio de Janeiro, RJ (Brazil)]. E-mail: rcco@bndes.gov.br

    2006-07-01

    Top-down, bottom-up and hybrid models for representing energy system are often used in energy planning. However, in developing countries some of their assumptions do not apply: markets are not developed and not competitive; informal economies are representative; there are huge social inequalities; regulatory changes are not completed; there exist constraints to capital flow; etc. All theses problems need to be well represented in order to have energy analysis more consistent. In this work, it is proposed a multi-sector dynamic recursive model that incorporates consumer behaviors, energy policies, technical progress and factors of production substitution. The static result feeds detailed energy models that provide updated values for the next step equilibrium. This approach takes advantages not only in terms of computation but also in terms of the consistence between economy and energy modeling. (author)

  12. The qualitative research proposal

    Directory of Open Access Journals (Sweden)

    H Klopper

    2008-09-01

    Full Text Available Qualitative research in the health sciences has had to overcome many prejudices and a number of misunderstandings, but today qualitative research is as acceptable as quantitative research designs and is widely funded and published. Writing the proposal of a qualitative study, however, can be a challenging feat, due to the emergent nature of the qualitative research design and the description of the methodology as a process. Even today, many sub-standard proposals at post-graduate evaluation committees and application proposals to be considered for funding are still seen. This problem has led the researcher to develop a framework to guide the qualitative researcher in writing the proposal of a qualitative study based on the following research questions: (i What is the process of writing a qualitative research proposal? and (ii What does the structure and layout of a qualitative proposal look like? The purpose of this article is to discuss the process of writing the qualitative research proposal, as well as describe the structure and layout of a qualitative research proposal. The process of writing a qualitative research proposal is discussed with regards to the most important questions that need to be answered in your research proposal with consideration of the guidelines of being practical, being persuasive, making broader links, aiming for crystal clarity and planning before you write. While the structure of the qualitative research proposal is discussed with regards to the key sections of the proposal, namely the cover page, abstract, introduction, review of the literature, research problem and research questions, research purpose and objectives, research paradigm, research design, research method, ethical considerations, dissemination plan, budget and appendices.

  13. H Scan/AHP decision process planning for evaluating and ranking of proposals submitted to the DOE hydrogen program

    Energy Technology Data Exchange (ETDEWEB)

    Szoka de Valladares, M.R. [National Renwable Energy Lab., Washington, DC (United States); Mack, S. [Energtics, Washington, DC (United States)

    1995-09-01

    The DOE Hydrogen Program needs to develop criteria as part of a systematic evaluation process for proposal identification, evaluation and selection. The H Scan component of this process provides a framework in which a project proposer can fully describe their candidate technology system and its components. The H Scan complements traditional methods of capturing cost and technical information. It consists of a special set of survey forms designed to elicit information so expert reviewers can assess the proposal relative to DOE specified selection criteria. The Analytic Hierarchy Process (AHP) component of the decision process assembles the management defined evaluation and selection criteria into a coherent multi-level decision construct by which projects can be evaluated in pair-wise comparisons. The AHP model will reflect management`s objectives and it will assist in the ranking of individual projects based on the extent to which each contributes to management`s objectives. This paper contains a detailed description of the products and activities associated with the planning and evaluation process: The objectives or criteria; the H Scan; and The Analytic Hierarchy Process (AHP).

  14. Sports Management for Sports Massification Planned and Executed by Social Organizations. Critics to Models, Experiences and Proposal Methodological Accompaniment

    OpenAIRE

    Lorenza Antonia Reyes de Duran

    2016-01-01

    The proposal analysis, interpretation, disassembly, self-criticism and guidance is born and comes from work experience planned mass sports and social organizations opposed-not in the conventional sense comparative-private business models and sport, state and management. The contribution made by the sports management experience from positions of power, either state or business are undeniable and its impact is difficult to express in numbers for its humanistic value, which is incalculable. Howe...

  15. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  16. Proposing an Aggregate Production Planning Model by Goal Programming Approach, a Case Study

    Directory of Open Access Journals (Sweden)

    Mansoureh Farzam Rad

    2014-06-01

    Full Text Available Production planning is one of the most important functions in the process of production management. Production planning in the intermediate range of time is termed as aggregate production planning (APP. Aggregate production planning is an important upper level planning activity in a production management system. The present study tries to suggest an aggregate production planning model for products of Hafez tile factory during one year. Due to this fact that the director of the company seeks 3 main objectives to determine the optimal production rate, the linear goal planning method was employed. After solving the problem, in order to examine the efficiency and the distinctiveness of this method in compare to linear programming, the problem was modeled just by considering one objective then was solved by linear programming approach. The findings revealed the goal programming with multi objectives resulted more appropriate solution rather than linear programming with just one objective.

  17. Conventional radiotherapy treatments (direct planning) of head and neck with photon X10 planning system (cms) and Siemens Primus accelerator: proposed protocol planning, difficulties encountered, tricks practical and possible amendments to the class solution

    International Nuclear Information System (INIS)

    Saez, F.; Benito, M. A.; Saez, M.

    2011-01-01

    In this paper we propose a protocol for the systematic planning process for a planner and an Accelerator XiO Primus. This protocol includes the creation of ancillary volumes for better dosimetric evaluation and design fields. Are some practical tips and cases arise in which you can change the Class Solution home. We compare this treatment with 10 turns without turning table with other tables. Finally, we show the advantages of this method from the radiobiological point of view to the bone, the main body of this type of risk treatments.

  18. 14 CFR 152.109 - Project eligibility: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...

  19. Hydrogeology and groundwater quality at monitoring wells installed for the Tunnel and Reservoir Plan System and nearby water-supply wells, Cook County, Illinois, 1995–2013

    Science.gov (United States)

    Kay, Robert T.

    2016-04-04

    Groundwater-quality data collected from 1995 through 2013 from 106 monitoring wells open to the base of the Silurian aquifer surrounding the Tunnel and Reservoir Plan (TARP) System in Cook County, Illinois, were analyzed by the U.S. Geological Survey, in cooperation with the Metropolitan Water Reclamation District of Greater Chicago, to assess the efficacy of the monitoring network and the effects of water movement from the tunnel system to the surrounding aquifer. Groundwater from the Silurian aquifer typically drains to the tunnel system so that analyte concentrations in most of the samples from most of the monitoring wells primarily reflect the concentration of the analyte in the nearby Silurian aquifer. Water quality in the Silurian aquifer is spatially variable because of a variety of natural and non-TARP anthropogenic processes. Therefore, the trends in analyte values at a given well from 1995 through 2013 are primarily a reflection of the spatial variation in the value of the analyte in groundwater within that part of the Silurian aquifer draining to the tunnels. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer when flow in the tunnel systemis greater than 80 million gallons per day may affect water quality in some nearby monitoring wells. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer appears to affect the values of electrical conductivity, hardness, sulfate, chloride, dissolved organic carbon, ammonia, and fecal coliform in samples from many wells but typically during less than 5 percent of the sampling events. Drainage of combined sewer flow into the aquifer is most prevalent in the downstream parts of the tunnel systems because of the hydraulic pressures elevated above background values and long residence time of combined sewer flow in those areas. Elevated values of the analytes emplaced during intermittent migration of combined sewer flow into the Silurian aquifer

  20. Proposed plan for the development of advanced instrumentation and control technology in Korea

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Ham, Chang-Shik

    1995-01-01

    All of the nuclear power plants in Korea are operating with analog instrumentation and control (I and C) equipment which are increasingly faced with frequent troubles, obsolescence and high maintenance expense. Electrical and computer technology has improved rapidly in recent years and has been applied to other industries. So it is strongly recommended to adopt the modern digital and computer technology to improve plant safety and availability. The plan, which is aimed at replacement of existing I and C systems, and at improving planned as well as next generation digital I and C systems is divided into three major parts: (1) Plan for domestic design of I and C systems and components, (2) Plan for domestic manufacturing of I and C equipment, and (3) Plan for development of future technologies. This plan provides advanced digital I and C requirements equivalent to Electric Power Research Institute Utility Requirements Document (Chapter 10) Man Machine Interface Systems. Also this plan includes the critical issue of digital I and C, namely software verification and validation strategy. (6 refs., 1 fig., 2 tabs.)

  1. Statement of Basis/Proposed Plan for the F-Area Burning/Rubble Pits (231-F, 231-1F, and 231-2F)

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-08-01

    The purpose of this source unit Statement of Basis/Proposed Plan is to describe the preferred alternative for addressing the F-Area Burning/Rubble Pits (231-F and 231-1F) and Rubble Pit (231-2F) (FBRP) source unit located at SRS, in southwestern Aiken County, South Carolina and to provide an opportunity for public input into the remedial action selection process

  2. American’s Energy Future: An Analysis of the Proposed Energy Policy Plans in Presidential Election

    Directory of Open Access Journals (Sweden)

    Ming-Hsun Cheng

    2016-11-01

    Full Text Available As the leader of the largest economy, President of the United States has substantive influence on addressing climate change problems. However, a presidential election is often dominated by issues other than energy problems. This paper focuses on the 2016 presidential election, and examines the energy plans proposed by the leading Democrat and Republican candidates. Our data from the Iowa caucus survey in January 2016 suggests that voters were more concerned about terrorism and economic issues than environmental issues. We then compare the Democratic and Republican candidate’s view of America’s energy future, and evaluate their proposed renewable energy targets. We find that the view on renewable energy is polarized between Democratic and Republican candidates, while candidates from both parties agree on the need for energy efficiency. Results from our ordinal least squares regression models suggests that Democratic candidates have moderate to ambitious goals for developing solar and other renewables. The Republican candidates favor fossil fuels and they choose not to provide any specific target for developing renewable energy. In addition, this trend of party polarization has grown more significant when compared with the past three presidential elections. Our observation suggests that energy policies need to be discussed more often regarding the diversification and decarbonization of the nation’s energy system.

  3. The alignment between spatial planning, transportation planning ...

    African Journals Online (AJOL)

    planning and environmental management strategically, functionally and operationally is ongoing .... between the built and the natural environment .... priorities as being experienced in. South Africa. 2. ... (intervention) proposals as contained.

  4. Anatomic variations of the renal vessels pertinent to transperitoneal vascular control in the management of trauma.

    Science.gov (United States)

    Kaneko, Naoyuki; Kobayashi, Yasushi; Okada, Yoshiaki

    2008-05-01

    Operative exposure and control of the renal vessels through a transabdominal retroperitoneal (TARP) approach has been advocated for emergency management of renal trauma. The pertinent anatomic variations of the renal vasculature have not been well described. In 190 cadavers, the renal vessels were examined. The first 20 cadavers were examined via TARP approach, and 170 cadavers were investigated after evisceration. The findings were interpreted as they might relate to the TARP approach to the renal pedicle. The renal artery (RA) originated dorsally or inferiorly to the left renal vein (RV) in 70% of the cadavers on each side. Additional RAs emerging below the inferior mesenteric artery were present in 2.4% of cadavers on the right side and 1.8% on the left. Approach to the inferior vena cava (IVC) adequate for the management of trauma through the TARP approach was impossible, although it has been recommended in some research. The clinically significant incidence of variations was as follows: 47% multiple RAs, 13% multiple RVs, and 50% of at least 1 RA that coursed superior to the right RV on the right margin of the IVC. Knowledge of the varied anatomy of the renal vessels facilitates a safe approach to the kidneys in trauma management. The varied and unpredictable anatomy of the renal vasculature requires prompt change when the TARP approach fails to provide access to the vessels. In such cases, the colon should be mobilized promptly. On the right side of the IVC, the vessels are located so as to require clamping together almost always.

  5. Proposed Plan for Interim Remedial Actions at the 100-NR-1 Source Sites Operable Unit and the 100-NR-2 Groundwater Operable Unit

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1998-02-01

    This Proposed Plan summary includes brief descriptions of the key issues for the 100-N Area contaminated soil and groundwater. This summary is intended as a simplified introduction to readers who might not be familiar with the contaminated site cleanup process or Hanford Site issues. The detailed Proposed Plan is attached to this summary. Some of the buildings and surrounding soils in the 100 Area of the Hanford Site were contaminated during operation of the nuclear reactors. The contamination poses a potential threat to public health and/or the environment. The potential threat to the public is exposure to people on or near the site to radiation and chemicals. The potential threat to the environment is contamination in the soil that has migrated to the groundwater and could eventually harm the Columbia River. Because of these potential threats, the Federal Government decided that the 100 Area was a high priority for cleanup and placed it on the National Priorities List

  6. Generational Pension Plan Designs

    NARCIS (Netherlands)

    Huang, Xiaohong; Mahieu, Ronald

    2010-01-01

    We propose a generational plan for the occupational pension provision in which people from the same generation are pooled in a generational fund. Each fund can set its own policies independently. This plan provides the benefits of differentiation missing in the prevailing collective plan and the

  7. Studies in Family Planning, Number 38. Beyond Family Planning.

    Science.gov (United States)

    Berelson, Bernard

    This paper, published by The Population Council, reviews 29 proposals dealing with population controls beyond the current efforts of national programs of voluntary family planning. The proposals are subsumed under eight descriptive categories which are: (1) Extensions of voluntary fertility control; (2) Establishment of involuntary fertility…

  8. Comparing landscape planning in England, Germany and the Netherlands : policy contexts and three case study plans

    NARCIS (Netherlands)

    Schröder, R.R.G.; Wascher, D.M.; Odell, S.; Smith, C.

    2010-01-01

    This comparative study of landscape planning, within three case-studies in England, Germany and the Netherlands, has the proposed outcomes to create a mutually understood model for ‘landscape planning’, a catalogue of key concepts on space, landscape and planning and a proposal for further European

  9. Bounded Intention Planning Revisited

    OpenAIRE

    Sievers Silvan; Wehrle Martin; Helmert Malte

    2014-01-01

    Bounded intention planning provides a pruning technique for optimal planning that has been proposed several years ago. In addition partial order reduction techniques based on stubborn sets have recently been investigated for this purpose. In this paper we revisit bounded intention planning in the view of stubborn sets.

  10. The expectancy-value muddle in the theory of planned behaviour - and some proposed solutions.

    Science.gov (United States)

    French, David P; Hankins, Matthew

    2003-02-01

    The authors of the Theories of Reasoned Action and Planned Behaviour recommended a method for statistically analysing the relationships between beliefs and the Attitude, Subjective Norm, and Perceived Behavioural Control constructs. This method has been used in the overwhelming majority of studies using these theories. However, there is a growing awareness that this method yields statistically uninterpretable results (Evans, 1991). Despite this, the use of this method is continuing, as is uninformed interpretation of this problematic research literature. This is probably due to the lack of a simple account of where the problem lies, and the large number of alternatives available. This paper therefore summarizes the problem as simply as possible, gives consideration to the conclusions that can be validly drawn from studies that contain this problem, and critically reviews the many alternatives that have been proposed to address this problem. Different techniques are identified as being suitable, according to the purpose of the specific research project.

  11. Online marketing plan proposal : Promotion of Microfinance Software Application to Nigeria

    OpenAIRE

    Boldosova, Valeriia

    2012-01-01

    Every company faces a time when there is a need to develop a marketing plan, which consists of determined goals and objectives, analysis of current situation, forecast planning and other relevant elements. In order to stay competitive and gain competitive advantage, companies seek for other marketing opportunities aside from traditional marketing. The era of technology has facilitated internet marketing development and opened the door of marketing opportunities. The main objective of this...

  12. Totally impermeable film (TIF reduces emissions in perennial crop fumigation

    Directory of Open Access Journals (Sweden)

    Suduan Gao

    2013-10-01

    Full Text Available Many perennial nursery fields and replanted orchards and vineyards in California are treated with preplant soil fumigants to control soilborne pests. In annual crops, such as strawberry, covering fumigated fields with totally impermeable film (TIF has shown promise in controlling emissions and improving fumigant distribution in soil. The objective of this research was to optimize the use of TIF for perennial crops via three field trials. TIF reduced peak emission flux and cumulative emissions by > 90% relative to polyethylene tarp during a 2-week covering period. After the TIF was cut, emissions were greatly reduced compared to when tarps were cut after 6 days. TIF maintained higher fumigant concentrations under tarp and in the soil than polyethylene film. The results indicate that TIF can increase fumigation efficiency for perennial crop growers.

  13. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  14. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    1987-01-01

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  15. The two faces of plan repair

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2004-01-01

    Plan repair has two faces. Alternately, a plan repair method looks like a planning method, or looks like a method that does exactly the opposite, i.e., removing actions from a plan. We propose a general framework for plan repair that shows the relation between these two alternating steps. Any plan

  16. American Carrier Air Power at the Dawn of a New Century

    Science.gov (United States)

    2005-01-01

    Systems, Office of the Secretary of Defense (Operational Test and Evaluation); then–Commander Calvin Craig, OPNAV N81; Captain Kenneth Neubauer and...TACP Tactical Air Control Party TARPS Tactical Air Reconnaissance Pod System TCS Television Camera System TLAM Tomahawk Land-Attack Missile TST Time...store any video imagery acquired by the aircraft’s systems, including the TARPS pod, the pilot’s head-up display (HUD), the Television Camera System (TCS

  17. Marketing plan

    OpenAIRE

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  18. Resilience and Renewable Energy Planning in Greenland

    DEFF Research Database (Denmark)

    Carruth, Susan

    2014-01-01

    Using a combination of thematic analysis and studio-based planning proposals in West Greenland, this paper proposes that there is more than one interpretation of resilience in renewable energy planning. All energy transitions, from one system to another, are protracted and unpredictable......, and the transition to a renewable energy system is proving no exception. Such a transition is particularly amplified in the context of Greenland – a country undergoing rapid transformation in many fields, including energy. Resilience theory offers an approach for how to plan for this energy transition, but how...... to translate resilience theory into planning practices remains underdeveloped. The paper begins by outlining some of the challenges in planning a transition to renewable energy, and sketching Greenland’s energy landscape. It then discusses the key characteristics of resilience thinking, before proposing...

  19. Place and Situated Deliberation in Participatory Planning – A Research Proposal

    DEFF Research Database (Denmark)

    Korn, Matthias

    2011-01-01

    for everyone and everywhere through a mobile augmented reality application that visualizes future, planned buildings on capable mobile phones. I conclude with the central questions and problems for future research that focuses on place and situated deliberation.......Within the domain of participatory urban planning, this position paper argues for a focus on the notion of place in the design of mobile and/or ubiquitous systems that are used in deliberation processes with central spatial references. I discuss (1) leveraging properties of place as a resource...

  20. Proposed Advanced Reactor Adaptation of the Standard Review Plan NUREG-0800 Chapter 4 (Reactor) for Sodium-Cooled Fast Reactors and Modular High-Temperature Gas-Cooled Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Belles, Randy [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Poore, III, Willis P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Brown, Nicholas R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Flanagan, George F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holbrook, Mark [Idaho National Lab. (INL), Idaho Falls, ID (United States); Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sofu, Tanju [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-03-01

    This report proposes adaptation of the previous regulatory gap analysis in Chapter 4 (Reactor) of NUREG 0800, Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light Water Reactor] Edition. The proposed adaptation would result in a Chapter 4 review plan applicable to certain advanced reactors. This report addresses two technologies: the sodium-cooled fast reactor (SFR) and the modular high temperature gas-cooled reactor (mHTGR). SRP Chapter 4, which addresses reactor components, was selected for adaptation because of the possible significant differences in advanced non-light water reactor (non-LWR) technologies compared with the current LWR-based description in Chapter 4. SFR and mHTGR technologies were chosen for this gap analysis because of their diverse designs and the availability of significant historical design detail.

  1. Proposals for changes in radiation protection standards

    International Nuclear Information System (INIS)

    Bowker, K.W.

    1990-01-01

    The International Commission on Radiological Protection has proposed changes to its recommendations on radiation protection standards. The proposed new control regime would distinguish between planned, potential and pre-existing exposure situations and between occupational, medical and public exposures. The proposals are expected to be published formally later this year. (author)

  2. 75 FR 14386 - Interpretation of Transmission Planning Reliability Standard

    Science.gov (United States)

    2010-03-25

    ...] Interpretation of Transmission Planning Reliability Standard March 18, 2010. AGENCY: Federal Energy Regulatory... transmission planning Reliability Standard TPL-002-0 provides that planning authorities and transmission... Reliability Standard TPL-002-0. In this order, the Commission proposes to reject NERC's proposed...

  3. How to write a research proposal?

    OpenAIRE

    K Sudheesh; Devika Rani Duggappa; S S Nethra

    2016-01-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ?blueprint? for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search...

  4. Planning of irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Caha, A; Krystof, V [Vyzkumny Ustav Klinicke a Experimentalni Onkologie, Brno (Czechoslovakia)

    1979-07-01

    The principles are discussed of the planning of irradiation, ie., the use of the various methods of location of a pathological focus and the possibility of semiautomatic transmission of the obtained data on a two-dimensional or spatial model. An efficient equipment is proposed for large irradiation centres which should cooperate with smaller irradiation departments for which also a range of apparatus is proposed. Irradiation planning currently applied at the Research Institute of Clinical and Experimental Oncology in Brno is described. In conclusion, some of the construction principles of semi-automatic operation of radiotherapy departments are discussed.

  5. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    Science.gov (United States)

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  6. Planning Multitechnology Access Networks with Performance Constraints

    Science.gov (United States)

    Chamberland, Steven

    Considering the number of access network technologies and the investment needed for the “last mile” of a solution, in today’s highly competitive markets, planning tools are crucial for the service providers to optimize the network costs and accelerate the planning process. In this paper, we propose to tackle the problem of planning access networks composed of four technologies/architectures: the digital subscriber line (xDSL) technologies deployed directly from the central office (CO), the fiber-to-the-node (FTTN), the fiber-to-the-micro-node (FTTn) and the fiber-to-the-premises (FTTP). A mathematical programming model is proposed for this planning problem that is solved using a commercial implementation of the branch-and-bound algorithm. Next, a detailed access network planning example is presented followed by a systematic set of experiments designed to assess the performance of the proposed approach.

  7. Sports Management for Sports Massification Planned and Executed by Social Organizations. Critics to Models, Experiences and Proposal Methodological Accompaniment

    Directory of Open Access Journals (Sweden)

    Lorenza Antonia Reyes de Duran

    2016-08-01

    Full Text Available The proposal analysis, interpretation, disassembly, self-criticism and guidance is born and comes from work experience planned mass sports and social organizations opposed-not in the conventional sense comparative-private business models and sport, state and management. The contribution made by the sports management experience from positions of power, either state or business are undeniable and its impact is difficult to express in numbers for its humanistic value, which is incalculable. However, it is urgent to emphasize the products and results achieved by some social organizations related to sport; as are the reference cases in Higuerón and the municipality Independence of Yaracuy state. From a dialectical analysis of reality, we try to understand the complex system that involves high-level sports management and performance, we introduce in the praxical notions of sporting activity and associated approach applied to social and community work. As opening and closing action research processes, we will make a proposal to accompany sports management concerning overcrowding by and from social organizations. This proposal is constructed from an innovative, flexible, open, inclusive and social, community and organizational curriculum relevance.

  8. Feature-based plan adaptation for fast treatment planning in scanned ion beam therapy

    International Nuclear Information System (INIS)

    Chen Wenjing; Gemmel, Alexander; Rietzel, Eike

    2013-01-01

    We propose a plan adaptation method for fast treatment plan generation in scanned ion beam therapy. Analysis of optimized treatment plans with carbon ions indicates that the particle number modulation of consecutive rasterspots in depth shows little variation throughout target volumes with convex shape. Thus, we extract a depth-modulation curve (DMC) from existing reference plans and adapt it for creation of new plans in similar treatment situations. The proposed method is tested with seven CT serials of prostate patients and three digital phantom datasets generated with the MATLAB code. Plans are generated with a treatment planning software developed by GSI using single-field uniform dose optimization for all the CT datasets to serve as reference plans and ‘gold standard’. The adapted plans are generated based on the DMC derived from the reference plans of the same patient (intra-patient), different patient (inter-patient) and phantoms (phantom-patient). They are compared with the reference plans and a re-positioning strategy. Generally, in 1 min on a standard PC, either a physical plan or a biological plan can be generated with the adaptive method provided that the new target contour is available. In all the cases, the V95 values of the adapted plans can achieve 97% for either physical or biological plans. V107 is always 0 indicating no overdosage, and target dose homogeneity is above 0.98 in all cases. The dose received by the organs at risk is comparable to the optimized plans. The plan adaptation method has the potential for on-line adaptation to deal with inter-fractional motion, as well as fast off-line treatment planning, with either the prescribed physical dose or the RBE-weighted dose. (paper)

  9. Regional manpower planning

    OpenAIRE

    G. Erens; P. Salamink; C.A. Van der Merwe CA

    2003-01-01

    Particular problems come to the fore when planning development at the regional level. These range from the complexities of the multifarious interactions between the sect oral and local components of the region to the necessity of achieving extensive participation of regional stakeholders in the planning process. In this paper a methodology for regional manpower planning is proposed. The methodology is designed to accommodate the full range of problems by applying a systems approach which is b...

  10. Security-Constrained Resource Planning in Electricity Market

    International Nuclear Information System (INIS)

    Roh, Jae Hyung; Shahidehpour, Mohammad; Yong Fu

    2007-06-01

    We propose a market-based competitive generation resource planning model in electricity markets. The objective of the model is to introduce the impact of transmission security in a multi-GENCO generation resource planning. The proposed approach is based on effective decomposition and coordination strategies. Lagrangian relaxation and Benders decomposition like structure are applied to the model. Locational price signal and capacity signal are defined for the simulation of competition among GENCOs and the coordination of security between GENCOs and the regulatory body (ISO). The numerical examples exhibit the effectiveness of the proposed generation planning model in electricity markets.

  11. GAO Strategic Plan 2007-2012

    National Research Council Canada - National Science Library

    2007-01-01

    In keeping with GAO's commitment to update its strategic plan at least once every 3 years consistent with the Government Performance and Results Act this strategic plan describes our proposed goals...

  12. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  13. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  14. An environmental pressure index proposal for urban development planning based on the analytic network process

    International Nuclear Information System (INIS)

    Gomez-Navarro, Tomas; Garcia-Melon, Monica; Acuna-Dutra, Silvia; Diaz-Martin, Diego

    2009-01-01

    This paper introduces a new approach to prioritize urban planning projects according to their environmental pressure in an efficient and reliable way. It is based on the combination of three procedures: (i) the use of environmental pressure indicators, (ii) the aggregation of the indicators in an Environmental Pressure Index by means of the Analytic Network Process method (ANP) and (iii) the interpretation of the information obtained from the experts during the decision-making process. The method has been applied to a proposal for urban development of La Carlota airport in Caracas (Venezuela). There are three options which are currently under evaluation. They include a Health Club, a Residential Area and a Theme Park. After a selection process the experts chose the following environmental pressure indicators as ANP criteria for the project life cycle: used land area, population density, energy consumption, water consumption and waste generation. By using goal-oriented questionnaires designed by the authors, the experts determined the importance of the criteria, the relationships among criteria, and the relationships between the criteria and the urban development alternatives. The resulting data showed that water consumption is the most important environmental pressure factor, and the Theme Park project is by far the urban development alternative which exerts the least environmental pressure on the area. The participating experts coincided in appreciating the technique proposed in this paper is useful and, for ranking ordering these alternatives, an improvement from traditional techniques such as environmental impact studies, life-cycle analysis, etc.

  15. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  16. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Science.gov (United States)

    2013-08-21

    ... Replacing Security Plan With New Radiation Safety Plan; U.S. Department of the Army, Jefferson Proving... security plan with a new radiation safety plan. DATES: Submit comments by September 20, 2013. Requests for.... The proposed change is to modify License Condition No. 12 D which refers to the security plan of...

  17. RNA interference screen identifies Abl kinase and PDGFR signaling in Chlamydia trachomatis entry.

    Directory of Open Access Journals (Sweden)

    Cherilyn A Elwell

    2008-03-01

    Full Text Available The strain designated Chlamydia trachomatis serovar L2 that was used for experiments in this paper is Chlamydia muridarum, a species closely related to C. trachomatis (and formerly termed the Mouse Pneumonitis strain of C. trachomatis. This conclusion was verified by deep sequencing and by PCR using species-specific primers. All data presented in the results section that refer to C. trachomatis should be interpreted as referring to C. muridarum. Since C. muridarum TARP lacks the consensus tyrosine repeats present in C. trachomatis TARP, we cannot make any conclusions about the role of TARP phosphorylation and C. muridarum entry. However, the conclusion that C. trachomatis L2 TARP is a target of Abl kinase is still valid as these experiments were performed with C. trachomatis L2 TARP [corrected]. To elucidate the mechanisms involved in early events in Chlamydia trachomatis infection, we conducted a large scale unbiased RNA interference screen in Drosophila melanogaster S2 cells. This allowed identification of candidate host factors in a simple non-redundant, genetically tractable system. From a library of 7,216 double stranded RNAs (dsRNA, we identified approximately 226 host genes, including two tyrosine kinases, Abelson (Abl kinase and PDGF- and VEGF-receptor related (Pvr, a homolog of the Platelet-derived growth factor receptor (PDGFR. We further examined the role of these two kinases in C. trachomatis binding and internalization into mammalian cells. Both kinases are phosphorylated upon infection and recruited to the site of bacterial attachment, but their roles in the infectious process are distinct. We provide evidence that PDGFRbeta may function as a receptor, as inhibition of PDGFRbeta by RNA interference or by PDGFRbeta neutralizing antibodies significantly reduces bacterial binding, whereas depletion of Abl kinase has no effect on binding. Bacterial internalization can occur through activation of PDGFRbeta or through independent

  18. 76 FR 39800 - Proposed Flood Elevation Determinations

    Science.gov (United States)

    2011-07-07

    ... Planning and Review. This proposed rule is not a significant regulatory action under the criteria of... Idaho Springs Maps are available for inspection at City Hall, 1711 Miner Street, Idaho Springs, CO 80452.... Town of Macclesfield Maps are available for inspection at the Edgecombe County Planning Department, 201...

  19. 18 CFR 5.11 - Potential Applicant's proposed study plan and study plan meetings.

    Science.gov (United States)

    2010-04-01

    ... study: (1) A detailed description of the study and the methodology to be used; (2) A schedule for... each study proposal and the information to be obtained; (2) Address any known resource management goals...; (4) Explain any nexus between project operations and effects (direct, indirect, and/or cumulative) on...

  20. Patient admission planning using Approximate Dynamic Programming

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Mes, Martijn R.K.; Boucherie, Richardus J.; Hans, Elias W.

    2016-01-01

    Tactical planning in hospitals involves elective patient admission planning and the allocation of hospital resource capacities. We propose a method to develop a tactical resource allocation and patient admission plan that takes stochastic elements into consideration, thereby providing robust plans.

  1. Transmission planning in a deregulated environment

    DEFF Research Database (Denmark)

    Xu, Zhao

    2006-01-01

    The worldwide trend for the deregulation of the electricity generation and transmission industries has led to dramatic changes in system operation and planning procedures. The optimum approach to transmission-expansion planning in a deregulated environment is an open problem especially when the r...... electricity market grid are performed. In addition, the proposed method is compared with a traditional planning method to further verify its effectiveness....... the responsibilities of the organisations carrying out the planning work need to be addressed. To date there is a consensus that the system operator and network manager perform the expansion planning work in a centralised way. However, with an increasing input from the electricity market, the objectives, constraints...... and approaches toward transmission planning should be carefully designed to ensure system reliability as well as meeting the market requirements. A market-oriented approach for transmission planning in a deregulated environment is proposed. Case studies using the IEEE 14-bus system and the Australian national...

  2. The proposed human factors engineering program plan for man-machine interface system design of the next generation NPP in Korea

    International Nuclear Information System (INIS)

    Oh, I.S.; Lee, H.C.; Seo, S.M.; Cheon, S.W.; Park, K.O.; Lee, J.W.; Sim, B.S.

    1994-01-01

    Human factors application to nuclear power plant (NPP) design, especially, to man-machine interface system (MMIS) design becomes an important issue among the licensing requirements. Recently, the nuclear regulatory bodies require the evidence of systematic human factors application to the MMIS design. Human Factors Engineering Program Plan (HFEPP), as a basis and central one among the human factors application by the MMIS designers. This paper describes the framework of HFEPP for the MMIS design of next generation NPP (NG-NPP) in Korea. This framework provides an integral plan and some bases of the systematic application of human factors to the MMIS design, and consists of purpose and scope, codes and standards, human factors organization, human factors tasks, engineering control methodology, human factors documentations, and milestones. The proposed HFEPP is a top level document to define and describe human factors tasks, based on each step of MMIS design process, in view point of how, what, when and by whom to be performed. (author). 11 refs, 1 fig

  3. Exposure of children and adolescents to alcohol advertising on television in Australia.

    Science.gov (United States)

    Winter, Matthew V; Donovan, Robert J; Fielder, Lynda J

    2008-09-01

    This article reports the extent to which children (0-12 years) and teenagers below the legal drinking age in Australia (13-17 years) were exposed to alcohol advertising on free-to-air television in Sydney, Australia, during the period from March 2005 to February 2006. Exposure levels were obtained from weekly Target Audience Rating Points (TARPs) data generated by OzTAM, the official Australian television audience monitoring system. (The TARPs figure for an advertisement is calculated based on the number of individuals from a target audience [e.g., 13- to 17-year-olds] exposed to the ad as a proportion of the total number of individuals within the target audience, multiplied by 100). Exposure levels were obtained for four age groups-up to 12 years, 13-17 years, 18-24 years, and 25 years and older-for 156 different ads for 50 brands. Adults 25 years and older were most exposed to alcohol advertising: approximately 660 TARPs per week. The level to which underage teenagers (13-17 years) were exposed to alcohol advertising was virtually identical to that of young adults (18-24 years): 426 TARPs per week vs 429 TARPs per week. Children (0-12 years) were exposed to approximately one in every three alcohol ads seen on average by mature adults (ages 25 years and older). This study found that Australian children and teenagers below the legal drinking age currently are exposed to unacceptably high levels of alcohol advertising on television. These findings suggest that alcohol marketers may be deliberately targeting underage adolescents. At the very least the findings highlight the need for action to be taken to reduce levels to which underage Australians are exposed to alcohol advertising on television.

  4. Continued Impact of SunSmart Advertising on Youth and Adults' Behaviors.

    Science.gov (United States)

    Dobbinson, Suzanne J; Volkov, Angela; Wakefield, Melanie A

    2015-07-01

    Televised advertising campaigns play a central role in public education for skin cancer prevention in Australia. Continued impact on behavior is crucial to optimize these investments. This study examines whether exposure to increased intensity of summer campaigns in the past decade has continued to influence sun protection behaviors and to examine behavioral impact across age groups. Cross-sectional weekly telephone surveys of Melbourne residents were conducted over summers from 1987-1988 to 2010-2011, and analyzed in 2012-2014. Respondents' sun-related attitudes and their sun protection and sunburn on the weekend prior to interview were assessed. Population exposure to campaign TV advertising was measured as cumulated weekly target audience rating points (TARPs) for 4 weeks prior to interviews. Multiple logistic and linear regression models examined the relationship of campaign advertising with tanning preference and behavioral outcomes (N=11,881). Respondents' attitudes and behaviors in 1987-2011 were associated with TARPs. Increasing TARPs were related to increased preference for no tan (OR=1.12, 95% CI=1.07, 1.17); sunscreen use (OR=1.09, 95% CI=1.02, 1.17); and overall reduced mean percentage of skin exposed to the sun (B=-0.01, 95% CI=-0.01, 0.00). These effects had limited interaction with time period, age group, gender, or skin type. There was evidence of diminishing returns at the highest TARP quartile for tan preference but not for behavioral outcomes. Sustained youth-focused advertising campaigns (for adolescents and young adults), when broadcast with sufficient TARPs during the summer months, continue to provide consistent beneficial impact on sun protection behaviors population-wide. Copyright © 2015 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  5. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  6. Proposed energy conservation contingency plan: emergency restrictions on illuminated advertising and certain gas lighting. Economic impact analysis. Environmental impact assessment. Contingency plan No. 5

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and natural gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.

  7. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  8. Supply chain planning with sustainability considerations: an integrative framework

    DEFF Research Database (Denmark)

    Wang, Yang; Akkerman, Renzo; Birkved, Morten

    2011-01-01

    This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from sustai...... produced on industrial scale, studying several important planning decisions like temperature treatments and choice of packaging materials.......This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from...

  9. How to write a research proposal?

    Science.gov (United States)

    Sudheesh, K; Duggappa, Devika Rani; Nethra, S S

    2016-09-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or 'blueprint' for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal.

  10. The effectiveness of television advertising campaigns on generating calls to a national Quitline by Māori.

    Science.gov (United States)

    Wilson, N; Grigg, M; Graham, L; Cameron, G

    2005-08-01

    To examine the effectiveness of four mass media campaigns on calls to a national Quitline by Māori (the indigenous people of New Zealand). Monthly Quitline call data and calls within one hour of a television commercial (TVC) being shown were analysed for the 2002-2003 period. Data on target audience rating points (TARPs) and expenditure on TVCs were also used (n = 2319 TVC placements). Māori were found to register with the Quitline at higher rates during the most intense six campaign months (15% more registrations compared to less intense months). The most effective campaign generated 115 calls per 100 TARPs by Māori callers within one hour of TVC airing (the "Every cigarette" campaign). A more Māori orientated campaign with both health and cultural themes generated 91 calls per 100 TARPs from Māori callers. For these two campaigns combined, the advertising cost per new registration with the Quitline by a Māori caller was NZD 30-48. Two second hand smoke campaigns that did not show the Quitline number were much less effective at 25 and 45 calls per 100 TARPs. These television advertising campaigns were effective and cost effective in generating calls to a national Quitline by Māori. Health authorities should continue to explore the use of both "threat appeal" style media campaigns and culturally appropriate campaigns to support Quitline use by indigenous peoples.

  11. 40 CFR 57.602 - Approval of proposal.

    Science.gov (United States)

    2010-07-01

    ... § 57.603. The application shall also specify: (1) The design and substantive elements of the research...) The smelter owner's proposal. The smelter owner's NSO application shall include a proposed NSO... agency is that the planned work must yield the most cost effective technology possible. (c) Optional...

  12. 50 CFR 85.22 - Grant proposals.

    Science.gov (United States)

    2010-10-01

    ... or benefits from accomplishing the objectives, including the numbers of recreational vessels and... should indicate how the activities contained in the proposal implements the plan); (b) Discrete objective...

  13. Inverse planning and class solutions for brachytherapy treatment planning

    International Nuclear Information System (INIS)

    Trnkova, P.

    2010-01-01

    Brachytherapy or interventional radiooncology is a method of radiation therapy. It is a method, where a small encapsulated radioactive source is placed near to / in the tumour and therefore delivers high doses directly to the target volume. Organs at risk (OARs) are spared due to the inverse square dose fall-off. In the past years there was a slight stagnation in the development of techniques for brachytherapy treatment. While external beam radiotherapy became more and more sophisticated, in brachytherapy traditional methods have been still used. Recently, 3D imaging was considered also as the modality for brachytherapy and more precise brachytherapy could expand. Nowadays, an image guided brachytherapy is state-of-art in many centres. Integration of imaging methods lead to the dose distribution individually tailored for each patient. Treatment plan optimization is mostly performed manually as an adaptation of a standard loading pattern. Recently, inverse planning approaches have been introduced into brachytherapy. The aim of this doctoral thesis was to analyze inverse planning and to develop concepts how to integrate inverse planning into cervical cancer brachytherapy. First part of the thesis analyzes the Hybrid Inverse treatment Planning and Optimization (HIPO) algorithm and proposes a workflow how to safely work with this algorithm. The problem of inverse planning generally is that only the dose and volume parameters are taken into account and spatial dose distribution is neglected. This fact can lead to unwanted high dose regions in a normal tissue. A unique implementation of HIPO into the treatment planning system using additional features enabled to create treatment plans similar to the plans resulting from manual optimization and to shape the high dose regions inside the CTV. In the second part the HIPO algorithm is compared to the Inverse Planning Simulated Annealing (IPSA) algorithm. IPSA is implemented into the commercial treatment planning system. It

  14. Evaluation and proposal of improvement for the measurement system in ATLAS

    International Nuclear Information System (INIS)

    Cho, Dong Woo; Kim, Jong Rok; Park, Jun Kwon

    2007-03-01

    The project independently evaluated the validities and reliability of measurement system in ATLAS, then proposed plans to improve the measurement system from evaluated results. For this objectives, we evaluated the design, technical backgrounds, verifying data of measurement system in ATLAS. From this evaluation, we proposed plans for improvement on parts which need improvement

  15. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  16. 78 FR 60015 - Proposed Policy Guidance on Metropolitan Planning Organization Representation

    Science.gov (United States)

    2013-09-30

    ... rulemaking, performance measures and standards to be used by States to assess the condition of the pavements... on MPO boards, this proposed guidance proposes flexible approaches for MPOs and providers of public...

  17. The Mediterranean Solar Plan: Project proposals for renewable energy in the Mediterranean Partner Countries region

    International Nuclear Information System (INIS)

    Jablonski, Sophie; Tarhini, Mohamad; Touati, Manaf; Gonzalez Garcia, David; Alario, Juan

    2012-01-01

    This paper presents a first assessment of the renewable energy projects, proposed by the nine Mediterranean Partner Countries (MPCs) under the Mediterranean Solar Plan (MSP) and the associated potential economic impacts. As one of the priority projects of the Union for the Mediterranean (UfM), the MSP's objective which attracted most attention until now is the intention to deploy an additional 20 GW of renewable electrical capacity in the Southern and Eastern Mediterranean region (covering the MPCs plus Turkey) by 2020. The main findings of this research are: (1) as of February 2010, a total of 10.3 GW of renewable project proposals were identified in the MPCs, corresponding to about half of the 20 GW target; (2) investment needs for the identified projects could amount to EUR 21 billion by 2020, which represents about five times the amount invested by the region in conventional electricity generation in the last decade; and (3) the difference between the cost of renewable electricity generation and the economic cost of its fossil fuel alternatives could amount to EUR 1.2 billion. Insights stemming from the results of this research can generate useful regional messages for energy policy leaders in the MPCs to accelerate the development of renewable energy projects. - Highlights: ► We conducted a systematic survey of renewable energy projects in the Mediterranean. ► The identified projects correspond to half the MSP 20 GW target. ► Maturity assessment is used to classify the advancement of the projects. ► We estimated the investment needs and required subsidies in the region by 2020.

  18. Wyoming : ITS/CVO business plan

    Science.gov (United States)

    1997-12-01

    Commercial Vehicle Operations (CVO) in Wyoming are among the safest and most efficient in the United States. This Business Plan recognizes the successes of Wyoming CVO and proposes seven elements to keep Wyoming a trucking leader. The Plan recommends...

  19. 32 CFR 206.5 - Final proposal process.

    Science.gov (United States)

    2010-07-01

    ... the basis of “educational value for the dollar.” NSEP is interested in funding proposals in areas... institution to integrate the efforts of the proposed program into the educational process? What plans are...) MISCELLANEOUS NATIONAL SECURITY EDUCATION PROGRAM (NSEP) GRANTS TO INSTITUTIONS OF HIGHER EDUCATION § 206.5...

  20. Planning Practice and Research

    DEFF Research Database (Denmark)

    2013-01-01

    Urban planning has dramatically shifted when compared with its former logics and styles. Increasingly, the dynamics of large urban agglomerations spanning multiple boundaries put significant pressure on planning institutions to scale up. In this shifting context, how can both planning theory...... and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...... papers from Young Academics. The contributions should address the question of how planning theory and practice can respond to the increasing complexity of cities and regions....

  1. Proposal and realization advertising campaign

    OpenAIRE

    RYCHLÁ, Marie

    2008-01-01

    The Bachelor Paper contains proposal and realization advertising campaign, including make charge for cost amount. The advertising campaign is made for chosen product of firm. Advertising campaign is planning by the medium of broadsheet and advertising on the Internet.

  2. How to write a research proposal?

    Directory of Open Access Journals (Sweden)

    K Sudheesh

    2016-01-01

    Full Text Available Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ′blueprint′ for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal.

  3. 48 CFR 1052.219-71 - Subcontracting Plan.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...

  4. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  5. Foresight as an e-Government Development Planning Component: Proposed e-Government Foresight Framework

    Directory of Open Access Journals (Sweden)

    Rokas Grincevičius

    2012-07-01

    Full Text Available Despite the fact that e-government is developed by a country which is making the first steps in this area, or state, seeking to increase effectiveness of the existing e-government tools, it is necessary to have the methodology to create a basis for the formation of strategic e-government decisions, whose implementation will meet existing citizen needs and emerged challenges which appear during continuous information communication technology transformation processes.One of the ways to respond to these requirements is the application of foresight exercises as a component of strategic e-government planning. Nevertheless in Lithuania and many other Eastern European countries, the planning process is still centralized, based on the five-year planning context. Ex communist states are behind other regions with the number of research based on the foresight methodology, so these conditions determine the lack of information in this domain and this article is a small part of the attempt to fill the existing vacuum.The main aim of this article is to analyse the foresight impact on the electronic government strategic planning process, its role in the political decision formation process and by identifying contact points of different foresight research components, in the context of e-government foresight methodology framework creation processes, to form a deeper perception on how foresight works as a system.This aim is determined by the following objectives—to analyse foresight concept, circumstances and causes of its origin, main guidelines, methods used during foresight exercises and reasons, which determine its application; also, to analyse different suggested foresight exercise approaches and according to the results of the analysis, to form a distinctive e-government foresight methodology, which can be used for already performed foresight analysis or for prototyping a planned one.Thus, the first part of the article covers the most important theoretical

  6. A proposal for a global task planning architecture using the RoboEarth cloud based framework

    OpenAIRE

    Janssen, R.J.M.; Molengraft, van de, M.J.G.; Steinbuch, M.; Di Marco, D.; Zweigle, O.; Levi, P.; Py, F.; Musliner, D.

    2012-01-01

    As robotic systems become more and more capable of assisting in human domains, methods are sought to compose robot executable plans from abstract human instructions. To cope with the semantically rich and highly expressive nature of human instructions, Hierarchical Task Network planning is often being employed along with domain knowledge to solve planning problems in a pragmatic way. Commonly, the domain knowledge is specific to the planning problem at hand, impeding re-use. Therefore this pa...

  7. Consumer-Choice Health plan (second of two parts). A national-health-insurance proposal based on regulated competition in the private sector.

    Science.gov (United States)

    Enthoven, A C

    1978-03-30

    Medical costs are straining public finances. Direct economic regulation will raise costs, retard beneficial innovation and be increasingly burdensome to physicians. As an alternative, I suggest that the government change financial incentives by creating a system of competing health plans in which physicians and consumers can benefit from using resources wisely. Main proposals consist of changed tax laws, Medicare and Medicaid to subsidize individual premium payments by an amount based on financial and predicted medical need, as well as subsidies usable only for premiums in qualified health insurance or delivery plans operating under rules that include periodic open enrollment, community rating by actuarial category, premium rating by market area and a limit on each person's out-of pocket costs. Also, efficient systems should be allowed to pass on the full savings to consumers. Finally, incremental changes should be made in the present system to alter it fundamentally, but gradually and voluntarily. Freedom of choice for consumers and physicians should be preserved.

  8. Proposed plan for education and training in nonnuclear and nuclear energy technologies

    International Nuclear Information System (INIS)

    Vachon, R.I.; Griffith, D.E.

    1977-02-01

    This report presents the results of a systems approach by an ERDA/ASEE Task Force to a charge from the 94th Congress to the Energy Research and Development Administration to develop a plan for a comprehensive program for education and training in nonnuclear energy technologies. The PLAN as presented is the recommendation of the Task Force and is not to be construed as the ERDA Plan. The interpretation of the charge leads to the following definitive statements. The PLAN should consist of a program and organizational and administrative means within ERDA to develop and manage the program. The program should: (1) include general educational subprograms, vocational skill subprograms to degree and post degree programs; (2) include nuclear as well as nonnuclear education and training; (3) encourage, assist, and utilize all institutions from labor unions to universities to assure educated and trained manpower to meet the nation's energy needs; (4) be catalytic in nature and rely not only on funding as a catalytic agent but also on information and leadership; (5) give equal opportunity to all seeking or needing education and training to become a part of the energy labor market in all regions of the nation; (6) be supplementary to what can be accomplished by the private sector; (7) promote interaction between ERDA and other Federal government agencies and state and local governments; (8) be responsive as well as anticipatory; (9) be applicable from energy resource exploration to energy and use; and (10) provide for input and feedback from the private sector

  9. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  10. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  11. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  12. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  13. The emergency plan of the ININ; El plan de emergencia del ININ

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz C, M A [ININ, Salazar, Estado de Mexico (Mexico)

    1991-07-01

    The emergency plan of the ININ, it was elaborated in 1988 and revised by the National Commission of Nuclear Safety and Safeguards (CNSNS) in 1989. At the beginning of 1990 and with the support of the IAEA it was practiced the first revision to the text of this plan, for what the proposal revision is what constitutes the development of this report.

  14. 75 FR 79030 - Proposed Extension of Existing Information Collection; Training Plans and Records of Training

    Science.gov (United States)

    2010-12-17

    ... Extension of Existing Information Collection; Training Plans and Records of Training AGENCY: Mine Safety and... extension of the information collection for Training Plans and Records of Training, 30 CFR 48.3, 48.9, 48.23... require training plans for underground and surface mines, respectively. The standards are intended to...

  15. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    NARCIS (Netherlands)

    Jongman, S.R.; Meyer, A.S.

    2017-01-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing

  16. Energy and climate: Brussels plan put to the test; Energie et climat: le plan de Bruxelles mis a l'epreuve

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2008-07-01

    In early 2008, the European Commission presented its highly ambitious plan to reduce greenhouse gas emissions. Two stumbling blocks stand in the way: industry's obvious reluctance, and the unanswered but crucial question of how to fund the proposed measures. Included are measures to reduce energy consumption, increase the share of renewable energies and boost energy efficiency. But controversy surrounds the proposed plan: nuclear power is ignored in the EU document, the plan price tag is 90 billion euros in 2020 and seven member states ask for clarification. The Commission is hoping for approval of its plan before the end of 2008.

  17. A patient-specific planning target volume used in 'plan of the day' adaptation for interfractional motion mitigation

    International Nuclear Information System (INIS)

    Chen, Wenjing; Gemmel, Alexander; Rietzel, Eike

    2013-01-01

    We propose a patient-specific planning target volume (PTV) to deal with interfractional variations, and test its feasibility in a retrospective treatment-planning study. Instead of using one planning image only, multiple scans are taken on different days. The target and organs at risk (OARs) are delineated on each images. The proposed PTV is generated from a union of those target contours on the planning images, excluding voxels of the OARs, and is denoted the PTV 'GP-OAR' (global prostate-organs at risk). The study is performed using 'plan of the day' adaptive workflow, which selects a daily plan from a library of plans based on a similarity comparison between the daily scan and planning images. The daily plans optimized for GP-OAR volumes are compared with those optimized for PTVs generated from a single prostate contour (PTV SP). Four CT serials of prostate cancer patient datasets are included in the test, and in total 28 fractions are simulated. The results show that the daily chosen GP-OAR plans provide excellent target coverage, with V95 values of the prostate mostly >95%. In addition, dose delivered to the OARs as calculated from applying daily chosen GP-OAR plans is slightly increased but comparable to that calculated from applying daily SP plans. In general, the PTV GP-OARs are able to cover possible target variations while keeping dose delivered to the OARs at a similar level to that of the PTV SPs. (author)

  18. A Planning Palimpsest

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay; Gutzon Larsen, Henrik; Olesen, Kristian

    2015-01-01

    In this article, we analyse the evolution and transformation of Danish spatial planning from its tentative origins in liberalist politics, through its rise as a central feature of the welfare state project, to its more recent entrepreneurial forms in a context of neoliberalisation. The article...... demonstrates how transformations of Danish spatial planning discourses and practices must be understood in context of previous discourses and practices sedimented as layers of meaning and materiality through time and over space. These layers do not completely overlay one another, but present a palimpsest...... saturated with contradictions as well as possibilities. We propose the notion of the ‘planning palimpsest’ as a helpful metaphor for drawing attention to the historical-geographical characteristics of planning discourses and practices....

  19. 10 CFR 1021.200 - DOE planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false DOE planning. 1021.200 Section 1021.200 Energy DEPARTMENT... Decisionmaking § 1021.200 DOE planning. (a) DOE shall provide for adequate and timely NEPA review of DOE... accordance with 40 CFR 1501.2 and this section. In its planning for each proposal, DOE shall include adequate...

  20. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  1. Acoustic window planning for ultrasound acquisition.

    Science.gov (United States)

    Göbl, Rüdiger; Virga, Salvatore; Rackerseder, Julia; Frisch, Benjamin; Navab, Nassir; Hennersperger, Christoph

    2017-06-01

    Autonomous robotic ultrasound has recently gained considerable interest, especially for collaborative applications. Existing methods for acquisition trajectory planning are solely based on geometrical considerations, such as the pose of the transducer with respect to the patient surface. This work aims at establishing acoustic window planning to enable autonomous ultrasound acquisitions of anatomies with restricted acoustic windows, such as the liver or the heart. We propose a fully automatic approach for the planning of acquisition trajectories, which only requires information about the target region as well as existing tomographic imaging data, such as X-ray computed tomography. The framework integrates both geometrical and physics-based constraints to estimate the best ultrasound acquisition trajectories with respect to the available acoustic windows. We evaluate the developed method using virtual planning scenarios based on real patient data as well as for real robotic ultrasound acquisitions on a tissue-mimicking phantom. The proposed method yields superior image quality in comparison with a naive planning approach, while maintaining the necessary coverage of the target. We demonstrate that by taking image formation properties into account acquisition planning methods can outperform naive plannings. Furthermore, we show the need for such planning techniques, since naive approaches are not sufficient as they do not take the expected image quality into account.

  2. Budget model can aid group practice planning.

    Science.gov (United States)

    Bender, A D

    1991-12-01

    A medical practice can enhance its planning by developing a budgetary model to test effects of planning assumptions on its profitability and cash requirements. A model focusing on patient visits, payment mix, patient mix, and fee and payment schedules can help assess effects of proposed decisions. A planning model is not a substitute for planning but should complement a plan that includes mission, goals, values, strategic issues, and different outcomes.

  3. Proposal of performance indicators/model for Operational Readiness Verification (ORV) at restart after a planned shutdown

    International Nuclear Information System (INIS)

    Hollnagel, Erik; Nygren, Magnus

    2005-12-01

    The objectives of the study reported here were to propose a model that can be used in the analysis of possible future ORV-related events and to outline a set of performance indicators that can be used by the inspectorate to assess a utility's level of readiness if an ORV-event should take place. Together the two objectives serve to improve the inspectorate's ability to ensure that the utilities maintain an adequate capability to respond. The background for the current study is the nine ORV events that occurred in Sweden between 1995- 1998, as well as the findings of a previous study of safety during outage and restart of nuclear power plants project. This study found that the three levels or types of tests that occur in ORV were used according to need rather than according to a predefined arrangement or procedure, and that tasks were adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. The organisation's coping with the complexity of ORV was discussed by the relation between expectations and surprises, how planning was used as control, attention to details, and the practices of shift changes. It is a truism that accidents are analysed and interpreted relative to a commonly accepted understanding of their nature. This understanding is, however, relative rather than absolute, and has changed significantly during the last decade. In the 1990s, accidents were analysed step by step, and explanations and recommendations therefore emphasised specific rather than generic solutions. The present study illustrates this by going through the responses to the nine ORV events. Following that, the nine events are analysed anew using a contemporary understanding of accidents (a systemic model), which emphasises that incidents more often arise from context induced performance variability than from failures of people. The alternative interpretation provided by a systemic model is illustrated by a detailed analysis of

  4. 31 CFR 30.7 - Q-7: How does a TARP recipient comply with the certification and disclosure requirements under...

    Science.gov (United States)

    2010-07-01

    ... senior risk officers, the SEO compensation plans to ensure that these plans do not encourage SEOs to take... officer (SEO) compensation plans and has made all reasonable efforts to ensure that these plans do not... committee must provide a narrative description identifying each SEO compensation plan and explaining how the...

  5. Analysing contemporary metropolitan spatial plans in Europe through their institutional context, instrumental content and planning process

    DEFF Research Database (Denmark)

    Elinbaum, Pablo; Galland, Daniel

    2016-01-01

    This article sets out to propose and apply a qualitative framework for thinking about how to analyze and compare metropolitan spatial plans in a milieu of divergent spatial planning traditions and discretionary planning practices. In doing so, the article reviews and develops an understanding...... concerning the institutional context, instrumental content and planning processes associated with four contemporary metropolitan spatial plans in Europe, namely London, Copenhagen, Paris and Barcelona. Through the results of a multiple case study and a subsequent cross comparative analysis, the article...... stresses that contemporary metropolitan spatial plans tend to merge characteristics associated with project-based and strategy-based spatial plans, thus contrasting with the typical land-use character of municipal plans and the often strategic, growth-oriented pursuit of regional plans in Europe...

  6. Sectoral Plan 'Deep Geological Disposal', Stage 2. Proposed site areas for the surface facilities of the deep geological repositories as well as for their access infrastructure. General report

    International Nuclear Information System (INIS)

    2011-12-01

    In line with the provisions of the nuclear energy legislation, the sites for deep geological disposal of Swiss radioactive waste are selected in a three-stage Sectoral Plan process (Sectoral Plan for Deep Geological Disposal). The disposal sites are specified in Stage 3 of the selection process with the granting of a general licence in accordance with the Nuclear Energy Act. The first stage of the process was completed on 30 th November 2011, with the decision of the Federal Council to incorporate the six geological siting regions proposed by the National Cooperative for the Disposal of Radioactive Waste (NAGRA) into the Sectoral Plan for Deep Geological Disposal, for further evaluation in Stage 2. The decision also specifies the planning perimeters within which the surface facilities and shaft locations for the repositories will be constructed. In the second stage of the process, at least two geological siting regions each will be specified for the repository for low- and intermediate-level waste (L/ILW) and for the high-level waste (HLW) repository and these will undergo detailed geological investigation in Stage 3. For each of these potential siting regions, at least one location for the surface facility and a corridor for the access infrastructure will also be specified. NAGRA is responsible, at the beginning of Stage 2, for submitting proposals for potential locations for the surface facilities and their access infrastructure to the Federal Office of Energy (SFOE); these are then considered by the regional participation bodies in the siting regions. The present report and its annexes volume document these proposals. In Stage 2, under the lead of the SFOE, socio-economic-ecological studies will also be carried out to investigate the impact of a repository project on the environment, economy and society. The present reports also contain the input data to be provided by NAGRA for the generic (site-independent) part of these impact studies. A meaningful discussion

  7. 77 FR 32137 - Agency Information Collection Activities: Proposed Collection; Comments Requested; Strategic...

    Science.gov (United States)

    2012-05-31

    ...] Agency Information Collection Activities: Proposed Collection; Comments Requested; Strategic Planning... Form/Collection: Strategic Planning Environmental Assessment Outreach. (3) Agency form number, if any... satisfaction. This act requires that agencies update and revise their strategic plans every three years. The...

  8. GRI proposes to hold the line on research program

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the Gas Research Institute has proposed a 1993 US research and development program totaling $201.8 million, the same level as the 1991 but down from $212.9 million this year. GRI filed the 1993 proposal and its 1993-97 R and D plan with the Federal Energy Regulatory Commission. If FERC approves the plan, interstate gas pipeline companies would support the GRI research by collecting a surcharge of 1.51 cents/Mcf on nondiscounted gas transactions and 8 cents/Mcf/month on uniform demand or reservations. The proposed budget is based on a revised funding mechanism FERC is considering for GRI. The research agency's general expanses and capital budget would remain at the 1992 level of $9.8 million

  9. Optimal transmission planning under the Mexican new electricity market

    International Nuclear Information System (INIS)

    Zenón, Eric; Rosellón, Juan

    2017-01-01

    This paper addresses electricity transmission planning under the new industry and institutional structure of the Mexican electricity market, which has engaged in a deep reform process after decades of a state-owned-vertically-integrated-non-competitive-closed industry. Under this new structure, characterized by a nodal pricing system and an independent system operator (ISO), we analyze welfare-optimal network expansion with two modeling strategies. In a first model, we propose the use of an incentive price-cap mechanism to promote the expansion of Mexican networks. In a second model, we study centrally-planned grid expansion in Mexico by an ISO within a power-flow model. We carry out comparisons of these models which provide us with hints to evaluate the actual transmission planning process proposed by Mexican authorities (PRODESEN). We obtain that the PRODESEN plan appears to be a convergent welfare-optimal planning process. - Highlights: • We model transmission planning (PRODESEN) in the Mexican new electricity market. • We propose a first model with a price-cap mechanism to promote network expansion. • In a second power-flow model, we study centrally-planned grid expansions. • The PRODESEN appears to be a convergent welfare-optimal planning process. • Incentive regulation could further help to implement such an optimal process.

  10. 7 CFR 1485.15 - Activity plan.

    Science.gov (United States)

    2010-01-01

    ... any changes in strategy from the strategic plan; (iii) A budget for each proposed activity... with respect to contributions and program evaluations. A participant may undertake promotional... accountable to CCC for all such promotional activities and related expenditures. (g) Activity plan changes. (1...

  11. 76 FR 1619 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2011-01-11

    ... SACWIS Assessment Reviews, at any time in the system life cycle. Submission of the SACWIS SARG and other...-0159] Proposed Information Collection Activity; Comment Request Proposed Projects Title: Statewide... the project, as described in the approved Advance Planning Document, have been adequately completed...

  12. Trajectory Planning with Pose Feedback for a Dual-Arm Space Robot

    Directory of Open Access Journals (Sweden)

    Yicheng Liu

    2016-01-01

    Full Text Available In order to obtain high precision path tracking for a dual-arm space robot, a trajectory planning method with pose feedback is proposed to be introduced into the design process in this paper. Firstly, pose error kinematic models are derived from the related kinematics and desired pose command for the end-effector and the base, respectively. On this basis, trajectory planning with pose feedback is proposed from a control perspective. Theoretical analyses show that the proposed trajectory planning algorithm can guarantee that pose error converges to zero exponentially for both the end-effector and the base when the robot is out of singular configuration. Compared with the existing algorithms, the proposed algorithm can lead to higher precision path tracking for the end-effector. Furthermore, the algorithm renders the system good anti-interference property for the base. Simulation results demonstrate the effectiveness of the proposed trajectory planning algorithm.

  13. Strategic Planning and Open Learning: Turkey Tails and Frogs.

    Science.gov (United States)

    Pacey, Lucille

    This paper discusses the principles of strategic planning and how they can be applied in open and distance learning for greater student success. The model selected for discussion is the Applied Strategic Planning Model which proposes nine important steps for strategic planning: planning to plan, values audit, mission formulation, strategic…

  14. Sectoral Plan 'Deep Geological Disposal', Stage 2. Proposed site areas for the surface facilities of the deep geological repositories as well as for their access infrastructure. Annexes

    International Nuclear Information System (INIS)

    2011-12-01

    In line with the provisions of the nuclear energy legislation, the sites for deep geological disposal of Swiss radioactive waste are selected in a three-stage Sectoral Plan process (Sectoral Plan for Deep Geological Disposal). The disposal sites are specified in Stage 3 of the selection process with the granting of a general licence in accordance with the Nuclear Energy Act. The first stage of the process was completed on 30 th November 2011, with the decision of the Federal Council to incorporate the six geological siting regions proposed by the National Cooperative for the Disposal of Radioactive Waste (NAGRA) into the Sectoral Plan for Deep Geological Disposal, for further evaluation in Stage 2. The decision also specifies the planning perimeters within which the surface facilities and shaft locations for the repositories will be constructed. In the second stage of the process, at least two geological siting regions each will be specified for the repository for low- and intermediate-level waste (L/ILW) and for the high-level waste (HLW) repository and these will undergo detailed geological investigation in Stage 3. For each of these potential siting regions, at least one location for the surface facility and a corridor for the access infrastructure will also be specified. NAGRA is responsible, at the beginning of Stage 2, for submitting proposals for potential locations for the surface facilities and their access infrastructure to the Federal Office of Energy (SFOE); these are then considered by the regional participation bodies in the siting regions. The general report and the present annexes volume document these proposals. In Stage 2, under the lead of the SFOE, socio-economic-ecological studies will also be carried out to investigate the impact of a repository project on the environment, economy and society. The present reports also contain the input data to be provided by NAGRA for the generic (site-independent) part of these impact studies. A meaningful

  15. 78 FR 45615 - Proposed Collection; Comment Request for the Annual Return/Report of Employee Benefit Plan

    Science.gov (United States)

    2013-07-29

    ... Annual Return/Report of Employee Benefit Plan AGENCY: Internal Revenue Service (IRS), Treasury. ACTION..., the IRS is soliciting comments concerning the Annual Return/Report of Employee Benefit Plan. [email protected] . SUPPLEMENTARY INFORMATION: Title: Annual Return/Report of Employee Benefit Plan. OMB...

  16. 75 FR 60013 - Proposed Flood Elevation Determinations

    Science.gov (United States)

    2010-09-29

    ... Planning and Review. This proposed rule is not a significant regulatory action under the criteria of.... Approximately 4.14 None +4953 miles downstream of Tom Miner Creek Road. Yellowstone River East Branch...

  17. Spatial planning of wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    This paper proposes guidelines for spatial planning for wind power, based on experience with spatial planning in Belgium, Denmark, France and the Netherlands. In addition experiences from Germany and Ireland have been used. This guidelines quotes all decisive criteria for successful implementation of wind energy: landscape integration, stakeholders involvement, noise and distance from buildings. (author)

  18. IMPROVEMENT OF PRODUCTION PLANNING IN COMPANY PARS KOMPONENTY

    Directory of Open Access Journals (Sweden)

    René Klega

    2014-03-01

    Full Text Available The article analyzes the current status of production planning in company Pars Komponenty s.r.o., proposes a new method of planning based on application of the principle of MRP. It is a discrete type of production with high complexity of BOM and MTO (Make-to-Order and ETO (Engineering-to-Order from the point of decoupling point. The original planning system plans according to production capacity backward without collisions, but for a given type of production does not work in practice. Planning system was analyzed and the main problems were identified, which were high work in progress and material stocks. This article target is to propose a new planining system based on the inclusion of time reserves of purchased material items. New planning system was tested in practise with benefit in reducing both the material inventory and work in progress.

  19. National spatial development planning in South Africa 1930-2010 ...

    African Journals Online (AJOL)

    National spatial development planning in South Africa 1930-2010: An introductory comparative analysis. ... Town and Regional Planning ... It demonstrates that, despite the ostensible support for national planning during this period, such plans and proposals rarely had a direct impact on the conduct of government business.

  20. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  1. Figure/ground analogy for integrated sustainability & planning

    CSIR Research Space (South Africa)

    Beyers, C

    2006-12-01

    Full Text Available This article proposes a figure ground analogy as alternative way of conceptually integrating sustainability and planning. Within this framework planners are challenged to creatively consider planning practice and thought against a background...

  2. Planning Through Incrementalism

    Science.gov (United States)

    Lasserre, Ph.

    1974-01-01

    An incremental model of decisionmaking is discussed and compared with the Comprehensive Rational Approach. A model of reconciliation between the two approaches is proposed, and examples are given in the field of economic development and educational planning. (Author/DN)

  3. 77 FR 74500 - Proposed Habitat Conservation Plan/Natural Community Conservation Plan for Western Butte County...

    Science.gov (United States)

    2012-12-14

    ... to streamline and coordinate existing processes for review and permitting of public and private... proposed to be covered by the BRCP: tricolored blackbird (Agelaius tricolor), yellow-breasted chat (Icteria... of the environmental review, the Service will publish a notice of availability and a request for...

  4. Group Acceptance Sampling Plan for Lifetime Data Using Generalized Pareto Distribution

    Directory of Open Access Journals (Sweden)

    Muhammad Aslam

    2010-02-01

    Full Text Available In this paper, a group acceptance sampling plan (GASP is introduced for the situations when lifetime of the items follows the generalized Pareto distribution. The design parameters such as minimum group size and acceptance number are determined when the consumer’s risk and the test termination time are specified. The proposed sampling plan is compared with the existing sampling plan. It is concluded that the proposed sampling plan performs better than the existing plan in terms of minimum sample size required to reach the same decision.

  5. Quality control of brachytherapy system module Oncentra MasterPlan V3.3 planning; Control de calidad del modulo de braquiterapia del sistema de planificacion Oncentra MasterPlan V3.3

    Energy Technology Data Exchange (ETDEWEB)

    Monja Ray, P. de la; Torres Pozas, S.; Sanchez Carrascal, M.; Macias Verde, D.; Martin Oliva, R.

    2011-07-01

    We present the results of quality control carried out the planning system (SP) MasterPlan Oncentra Brachy, version 3.3 (Nucletron), on the occasion of its launch, following the recommendations proposed in the Protocol for quality control in planning systems therapy with ionizing radiation [SEFM, published by the Spanish Society of Medical Physics (SEFM) in 2005].

  6. Personal strategic planning

    Directory of Open Access Journals (Sweden)

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  7. 77 FR 17502 - Agency Information Collection Activities: Proposed Collection; Comments Requested: Strategic...

    Science.gov (United States)

    2012-03-26

    ...] Agency Information Collection Activities: Proposed Collection; Comments Requested: Strategic Planning... agencies update and revise their strategic plans every three years. The Strategic Planning Office at ATF... accepted for ``sixty days'' until May 25, 2012. This process is conducted in accordance with 5 CFR 1320.10...

  8. Effective Business Planning: : A key To Successful Enterprises

    OpenAIRE

    Dongol, Rina; Neupane, Basudha

    2009-01-01

    The main objective of this thesis is to have knowledge of proper business plan. Business plan is a backbone of any business. It is crucial to lay down the aims of the business plan; mission, goals, tasks and action plan of the business plan clearly into the proposal. The fundamentals of business planning are outlined in the theoretical framework. The study’s theoretical objective is to outline the models of business planning, and to create a general understanding of the important theories of ...

  9. 76 FR 45645 - 10-Day Notice of Proposed Information Collection: Technology Security/Clearance Plans, Screening...

    Science.gov (United States)

    2011-07-29

    ...: Technology Security/Clearance Plans, Screening Records, and Non-Disclosure Agreements ACTION: Notice of... Information Collection: Technology Security/ Clearance Plans, Screening Records, and Non-Disclosure Agreements...: None. Respondents: Business and Nonprofit Organizations, Foreign Governments. Estimated Number of...

  10. Sea materials experimental plans

    International Nuclear Information System (INIS)

    1987-07-01

    This Seal Materials Performance Test Plan describes the plan for testing materials that will be used to seal a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The need for sealing and backfilling the repository and the use of various sealing materials are described. The seal materials include mined salt backfills, cementitious bulkheads and plugs, and earthen backfills. The laboratory testing program for characterizing the behavior and performance of these materials is described. This report includes plans for screening materials, evaluating candidate materials to be tested, and testing a representative set of materials

  11. Integrating robust timetabling in line plan optimization for railway systems

    DEFF Research Database (Denmark)

    Burggraeve, Sofie; Bull, Simon Henry; Vansteenwegen, Pieter

    2017-01-01

    We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger travel time and operator cost and for which a feasible and robust timetable exists. A line planning module and a timetabling module work iteratively and interactively. The line planning module......, but is constrained by limited shunt capacity. While the operator and passenger cost remain close to those of the initially and (for these costs) optimally built line plan, the timetable corresponding to the finally developed robust line plan significantly improves the minimum buffer time, and thus the robustness...... creates an initial line plan. The timetabling module evaluates the line plan and identifies a critical line based on minimum buffer times between train pairs. The line planning module proposes a new line plan in which the time length of the critical line is modified in order to provide more flexibility...

  12. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  13. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  14. Evaluation of Mexico's 1975-2000 energy plan

    International Nuclear Information System (INIS)

    Bazan-Perkins, Sergio D.; Fernandez-Zayas, Jose L.

    2008-01-01

    The certainty and trustworthiness of a planning model can best be assessed when projections can be compared with actual developments. The ability to design scenarios and to evaluate demographic, economic and technological change is also increased with periodic comparisons between plans and actual facts. In 1976, the Mexican government published a 25 year power supply plan for the country, in which a development of non-fossil fuel plants was recommended, largely due to environmental considerations. It was proposed that the new demand should be met mainly with renewable energy sources and nuclear power. The study stated that hydrocarbons would reach a peak between 2003 and 2005, and that after this point the descent of fuel consumption would proceed at an increased velocity. Under this program, the dependence of Mexico on fuel for electricity would be gradually reduced as the 21st century progressed. The suggestion was not assumed by successive governments, and fossil fuel plants took the place of the proposed nuclear plants. However, the original 25 years power plan has proved to be quite accurate in its social and economic previsions, and allows the validation of a new, more powerful and reliable planning model. This paper presents the results of the validation of the model, as well as major considerations to be heeded in the future to increase certainty in further planning efforts. The projection of a better, more sustainable and reliable energy future is also proposed

  15. Reflections on the role and design of online dictionaries for specialised translation

    DEFF Research Database (Denmark)

    Tarp, Sven

    2014-01-01

    This article is an updated and modified version of a Spanish article published in MonTi 6 (cf. Tarp 2014a). It deals with specialised translation dictionaries. Based on the principles of the function theory, it analyses the different phases and sub-phases of the translation process from a lexicog......This article is an updated and modified version of a Spanish article published in MonTi 6 (cf. Tarp 2014a). It deals with specialised translation dictionaries. Based on the principles of the function theory, it analyses the different phases and sub-phases of the translation process from...

  16. Ethnography of Language Planning and Policy

    Science.gov (United States)

    Hornberger, Nancy H.; Tapia, Aldo Anzures; Hanks, David H.; Dueñas, Frances Kvietok

    2018-01-01

    A decade ago, Hornberger & Johnson proposed that the ethnography of language planning and policy (ELPP) offers a useful way to understand how people create, interpret, and at times resist language policy and planning (LPP). They envisioned ethnographic investigation of layered LPP ideological and implementational spaces, taking up Hornberger's…

  17. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1999-01-01

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation

  18. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  19. Strategic Planning for New Presidents: Developing an Entrance Plan

    Science.gov (United States)

    Garza Mitchell, Regina L.; Maldonado, Cesar

    2015-01-01

    Community colleges are greatly impacted by turbulent external forces while also experiencing turnover in the topmost leadership positions. New presidents must learn how to lead an institution while also planning for purposeful change that will allow the college to thrive. In this article, the authors propose a method for new presidents to develop…

  20. Columbia River impact evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    As a result of past practices, four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. To accomplish the timely cleanup of the past-practice units, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), was signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE). To support the Tri-Party Agreement, milestones were adopted. These milestones represent the actions needed to ensure acceptable progress toward Hanford Site compliance with CERCLA, RCRA, and the Washington State Hazardous Waste Management Act of 1976. This report was prepared to fulfill the requirement of Tri-Party Agreement Milestone M-30-02, which requires a plan to determine cumulative health and environmental impacts to the Columbia River. This plan supplements the CERCLA remedial investigations/feasibility studies (RI/FS) and RCRA facility investigations/corrective measures studies (RFI/CMSs) that will be undertaken in the 100 Area. To support the plan development process, existing information was reviewed and a preliminary impact evaluation based on this information was performed. The purpose of the preliminary impact evaluation was to assess the adequacy of existing data and proposed data collection activities. Based on the results of the evaluation, a plan is proposed to collect additional data or make changes to existing or proposed data collection activities.

  1. Technical Note: Improving the VMERGE treatment planning algorithm for rotational radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Gaddy, Melissa R., E-mail: mrgaddy@ncsu.edu; Papp, Dávid, E-mail: dpapp@ncsu.edu [Department of Mathematics, North Carolina State University, Raleigh, North Carolina 27695-8205 (United States)

    2016-07-15

    Purpose: The authors revisit the VMERGE treatment planning algorithm by Craft et al. [“Multicriteria VMAT optimization,” Med. Phys. 39, 686–696 (2012)] for arc therapy planning and propose two changes to the method that are aimed at improving the achieved trade-off between treatment time and plan quality at little additional planning time cost, while retaining other desirable properties of the original algorithm. Methods: The original VMERGE algorithm first computes an “ideal,” high quality but also highly time consuming treatment plan that irradiates the patient from all possible angles in a fine angular grid with a highly modulated beam and then makes this plan deliverable within practical treatment time by an iterative fluence map merging and sequencing algorithm. We propose two changes to this method. First, we regularize the ideal plan obtained in the first step by adding an explicit constraint on treatment time. Second, we propose a different merging criterion that comprises of identifying and merging adjacent maps whose merging results in the least degradation of radiation dose. Results: The effect of both suggested modifications is evaluated individually and jointly on clinical prostate and paraspinal cases. Details of the two cases are reported. Conclusions: In the authors’ computational study they found that both proposed modifications, especially the regularization, yield noticeably improved treatment plans for the same treatment times than what can be obtained using the original VMERGE method. The resulting plans match the quality of 20-beam step-and-shoot IMRT plans with a delivery time of approximately 2 min.

  2. National planning in South Africa: A temporal perspective

    African Journals Online (AJOL)

    and policy interventions, whether or not these relate to formal land-use planning control.” A national plan can be identified as “a government economic plan which lays down the proposed pattern of economic development (investment ... overly bureaucratic and excessively technocratic approaches to government. This article ...

  3. Review of the FAA 1982 National Airspace System plan

    Science.gov (United States)

    1982-08-01

    The National Airspace (NAS) Plan outlines the Federal Aviation Administration's most recent proposals for modernizing the facilities and equipment that make up the air traffic control (ATC) system. This review of the NAS Plan examines the Plan at two...

  4. 33 CFR 332.4 - Planning and documentation.

    Science.gov (United States)

    2010-07-01

    ... should be kept confidential for business purposes, such as the exact location of a proposed mitigation... minimization and the amount, type, and location of any proposed compensatory mitigation, including any out-of... mitigation proposals and plans must be conducted in accordance with the terms and conditions of those permits...

  5. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    Science.gov (United States)

    Jongman, Suzanne R; Meyer, Antje S

    2017-11-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing the processing costs associated with concurrent listening and speaking. In two experiments, we assessed how identity and associative priming from spoken words onto picture naming were affected by a concurrent speech planning task. In a baseline (no name) condition, participants heard prime words that were identical, associatively related, or unrelated to target pictures presented two seconds after prime onset. Each prime was accompanied by a non-target picture and followed by its recorded name. The participant did not name the non-target picture. In the plan condition, the participants first named the non-target picture, instead of listening to the recording, and then the target. In Experiment 1, where the plan- and no-plan conditions were tested between participants, priming effects of equal strength were found in the plan and no-plan condition. In Experiment 2, where the two conditions were tested within participants, the identity priming effect was maintained, but the associative priming effect was only seen in the no-plan but not in the plan condition. In this experiment, participant had to decide at the onset of each trial whether or not to name the non-target picture, rendering the task more complex than in Experiment 1. These decision processes may have interfered with the processing of the primes. Thus, associative priming can take place during speech planning, but only if the cognitive load is not too high. Copyright © 2017 Elsevier B.V. All rights reserved.

  6. 76 FR 47180 - Pick-Sloan Missouri Basin Program-Eastern Division-2021 Power Marketing Initiative Proposal

    Science.gov (United States)

    2011-08-04

    ... marketing plan principles. The comment period for the proposed 2021 PMI ended on May 4, 2011. Western... customers the opportunity to review current marketing plan principles and provide informal input to Western... Division--2021 Power Marketing Initiative Proposal AGENCY: Western Area Power Administration, DOE. ACTION...

  7. Heuristic Search for Planning with Different Forced Goal-Ordering Constraints

    Directory of Open Access Journals (Sweden)

    Jiangfeng Luo

    2013-01-01

    Full Text Available Planning with forced goal-ordering (FGO constraints has been proposed many times over the years, but there are still major difficulties in realizing these FGOs in plan generation. In certain planning domains, all the FGOs exist in the initial state. No matter which approach is adopted to achieve a subgoal, all the subgoals should be achieved in a given sequence from the initial state. Otherwise, the planning may arrive at a deadlock. For some other planning domains, there is no FGO in the initial state. However, FGO may occur during the planning process if certain subgoal is achieved by an inappropriate approach. This paper contributes to illustrate that it is the excludable constraints among the goal achievement operations (GAO of different subgoals that introduce the FGOs into the planning problem, and planning with FGO is still a challenge for the heuristic search based planners. Then, a novel multistep forward search algorithm is proposed which can solve the planning problem with different FGOs efficiently.

  8. Review of the proposed Strategic National Plan for Civilian Nuclear Reactor Development: Volume 1

    International Nuclear Information System (INIS)

    1986-10-01

    On August 9, 1985, the Secretary of Energy requested that the Chairman of the Energy Research Advisory Board establish an ad-hoc Panel to review a draft ''Strategic National Plan for Civilian Nuclear Reactor Development.'' The resulting report, approved by the Board, contains suggestions for improving the draft plan and also contains major recommendations for alleviating the several institutional barriers that appear to preclude the construction of any new nuclear power plants in this country

  9. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  10. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  11. Elective course planning

    DEFF Research Database (Denmark)

    Kristiansen, Simon; Sørensen, Matias; Stidsen, Thomas Riis

    2011-01-01

    Efficient planning increasingly becomes an indispensable tool for management of both companies and public organizations. This is also the case for high school management in Denmark, because the growing individual freedom of the students to choose courses makes planning much more complex. Due...... to reforms, elective courses are today an important part of the curriculum, and elective courses are a good way to make high school education more attractive for the students. In this article, the problem of planning the elective courses is modeled using integer programming and three different solution...... for the Elective Course Planning Problem has been described in the literature before. The proposed algorithms are tested on data sets from 98 of the 150 high schools in Denmark. The tests show that for the majority of the problems, the optimal solution can be obtained within the one hour time bound. Furthermore...

  12. Generation Expansion Planning Considering Integrating Large-scale Wind Generation

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Østergaard, Jacob

    2013-01-01

    necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. A bi-level generation expansion planning approach considering large-scale wind generation was proposed in this paper. The first phase is investment decision, while the second phase is production...... optimization decision. A multi-objective PSO (MOPSO) algorithm was introduced to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of the proposed bi-level planning approach and the MOPSO...

  13. Minimum dose method for walking-path planning of nuclear facilities

    International Nuclear Information System (INIS)

    Liu, Yong-kuo; Li, Meng-kun; Xie, Chun-li; Peng, Min-jun; Wang, Shuang-yu; Chao, Nan; Liu, Zhong-kun

    2015-01-01

    Highlights: • For radiation environment, the environment model is proposed. • For the least dose walking path problem, a path-planning method is designed. • The path-planning virtual–real mixed simulation program is developed. • The program can plan walking path and simulate. - Abstract: A minimum dose method based on staff walking road network model was proposed for the walking-path planning in nuclear facilities. A virtual–reality simulation program was developed using C# programming language and Direct X engine. The simulation program was used in simulations dealing with virtual nuclear facilities. Simulation results indicated that the walking-path planning method was effective in providing safety for people walking in nuclear facilities

  14. 77 FR 34037 - Agency Information Collection Activities; Proposed Collection; Comment Request; Trade Secret...

    Science.gov (United States)

    2012-06-08

    ... Activities; Proposed Collection; Comment Request; Trade Secret Claims for Emergency Planning and Community... Planning and Community Right-to- Know Act (EPCRA). Title: Trade Secret Claims for Emergency Planning and...). Estimated total number of potential respondents: 481. Frequency of response: Trade secret claims are...

  15. Proposal to increase the drug adherence in a brazilian health unit

    Directory of Open Access Journals (Sweden)

    Ariane Garrocho de Faria

    2016-12-01

    Full Text Available http://dx.doi.org/10.5007/1807-0221.2016v13n24p174 The aim of this work was to use a Strategic Planning tool to check for problems and propose strategic activities that increases the drug treatment adherence in a UBS of Minas Gerais. This study was developed from May to October 2015 using Strategic Planning divided in four stages: explanatory, normative, strategic and tactical situational. Resulting actions were defined in order to increase the drug treatment adherence and reduce unnecessary spending. Thus, the importance of the method was perceived, been able to meet the views of participants need and direct discussions to achieve the proposed goals. In conclusion, the method evidenced the awareness of the participants and the shared responsibility for patients as well as the planning official. It is expected following the implementation of the proposed actions, achieving success in relation to the drug treatment adherence.

  16. Resilience and Renewable Energy Planning in Greenland

    DEFF Research Database (Denmark)

    Carruth, Susan

    2014-01-01

    to translate resilience theory into planning practices remains underdeveloped. The paper begins by outlining some of the challenges in planning a transition to renewable energy, and sketching Greenland’s energy landscape. It then discusses the key characteristics of resilience thinking, before proposing...

  17. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  18. Integrated Task and Motion Planning with Verification via Formal Methods

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal lays out a research plan to "lift" current state-of-the-art results combining discrete and continuous layers of planning in motion planning to the more...

  19. Enhancing Transportation Equity Analysis for Long Range Planning and Decision Making

    OpenAIRE

    Bills, Tierra Suzan

    2013-01-01

    Metropolitan Planning Organizations (MPOs) regularly perform equity analyses for their long-range transportation plans, as this is required by Environmental Justice regulations. These regional-level plans may propose hundreds of transportation infrastructure and policy changes (e.g. highway and transit extensions, fare changes, pricing schemes, etc.) as well as land-use policy changes. The challenge is to assess the distribution of impacts from all the proposed changes across different popula...

  20. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1987-05-01

    This document presents a plan for seismic research to be performed by the Structural and Seismic Engineering Branch in the Office of Nuclear Regulatory Research. The plan describes the regulatory needs and related research necessary to address the following issues: uncertainties in seismic hazard, earthquakes larger than the design basis, seismic vulnerabilities, shifts in building frequency, piping design, and the adequacy of current criteria and methods. In addition to presenting current and proposed research within the NRC, the plan discusses research sponsored by other domestic and foreign sources

  1. Artificial Neural Network Based Mission Planning Mechanism for Spacecraft

    Science.gov (United States)

    Li, Zhaoyu; Xu, Rui; Cui, Pingyuan; Zhu, Shengying

    2018-04-01

    The ability to plan and react fast in dynamic space environments is central to intelligent behavior of spacecraft. For space and robotic applications, many planners have been used. But it is difficult to encode the domain knowledge and directly use existing techniques such as heuristic to improve the performance of the application systems. Therefore, regarding planning as an advanced control problem, this paper first proposes an autonomous mission planning and action selection mechanism through a multiple layer perceptron neural network approach to select actions in planning process and improve efficiency. To prove the availability and effectiveness, we use autonomous mission planning problems of the spacecraft, which is a sophisticated system with complex subsystems and constraints as an example. Simulation results have shown that artificial neural networks (ANNs) are usable for planning problems. Compared with the existing planning method in EUROPA, the mechanism using ANNs is more efficient and can guarantee stable performance. Therefore, the mechanism proposed in this paper is more suitable for planning problems of spacecraft that require real time and stability.

  2. 76 FR 7560 - Agency Information Collection Activities; Proposed Collection; Comment Request; Transportation...

    Science.gov (United States)

    2011-02-10

    ... Activities; Proposed Collection; Comment Request; Transportation Conformity Determinations for Federally... federally supported transportation activities are consistent with (``conform to'') the purpose of the state air quality implementation plan (SIP). Transportation activities include transportation plans...

  3. Recharge dams construction plan proposal for the Alicante province (Spain); Propuesta del plan de construccion de presas de recarga en la provincia de Alicante (Espana)

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Hernandez, L. M.; Solis Garcia-Borbon, L.; Maximo Marin, M.; Fernandez Mejuto, M.; Castillo Sanchez, V. M.; Hernandez Bravo, J. A.

    2009-07-01

    The Recharge Dams Construction Plan for the Alicante Province (administrative division within the Comunidad Valenciana in Spain) is a proposal of the Diputacion de Alicante, as a result of the previous studies undertaken by the Departamento de Ciclo Hidrico (Department of Water Cycle). Runoff series for all the provincial sub basins for the rainfall events of the past 50 years have been generated, possible impoundment volumes over permeable grounds have been analyzed and a group of them have been chosen attending to certain criteria. Afterwards, for the selected dams, inflow runoff series have been generated, modeling infiltration into the ground and estimating both infiltrated volumes as well as its costs. Finally, after comparing with empirical data of instrumented basins for continuous runoff record, the construction of 52 in three horizons is proposed: Phase 1: the 25 most interesting, with a target of 7,94 hm{sup 3}/year infiltrated, with average cost of 0,09 Euros/m{sup 3} and total cost of 12,10 millions of Euros. Phase 2: 18' serial dams' to regulate runoff that has not been regulated in phase 1, with a target of 6,9 hm{sup 3}/year infiltrated, with average cost of 0,08 Euros/m{sup 3} and total cost of 10,2 millions of euros. Phase 3: 10 'pilot dams', in principle less profitable but very interesting to obtain data in mountain basins, with a target of 0,9 hm{sup 3}/year infiltrated, with average cost of 0,31 euros/m{sup 3} and total cost of 4,9 millions of Euros. (Author) 7 refs.

  4. Environmental assessment, proposed generating station for Darlington

    International Nuclear Information System (INIS)

    1975-04-01

    This document indicates the intention of Ontario Hydro to seek approval from the Provincial Government for its plan to construct and operate a 3400 MWe nuclear generating station at the Darlington site, west of Bowmanville. This preliminary proposal also contains the environmental assessment. The environmental section of this proposal describes and assesses the existing environment and the environmental influences which would occur due to the construction and operation of a nuclear generating station, consisting of four 850 MW units, at the Darlington site. This proposed station is similar to the Bruce GS A station presently under construction. (author)

  5. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  6. Proposing water balance method for water availability estimation in Indonesian regional spatial planning

    Science.gov (United States)

    Juniati, A. T.; Sutjiningsih, D.; Soeryantono, H.; Kusratmoko, E.

    2018-01-01

    The water availability (WA) of a region is one of important consideration in both the formulation of spatial plans and the evaluation of the effectiveness of actual land use in providing sustainable water resources. Information on land-water needs vis-a-vis their availability in a region determines the state of the surplus or deficit to inform effective land use utilization. How to calculate water availability have been described in the Guideline in Determining the Carrying Capacity of the Environment in Regional Spatial Planning. However, the method of determining the supply and demand of water on these guidelines is debatable since the determination of WA in this guideline used a rational method. The rational method is developed the basis for storm drain design practice and it is essentially a peak discharge method peak discharge calculation method. This paper review the literature in methods of water availability estimation which is described descriptively, and present arguments to claim that water balance method is a more fundamental and appropriate tool in water availability estimation. A better water availability estimation method would serve to improve the practice in preparing formulations of Regional Spatial Plan (RSP) as well as evaluating land use capacity in providing sustainable water resources.

  7. Designing Pension Plans to Incorporate Recent Legislation.

    Science.gov (United States)

    Biggs, John H.

    1983-01-01

    Two proposals before Congress threaten to offset the delicate balance in pension plan design. The significance of the normal retirement feature in plan design, some possible program design changes, and how the pension arrangements of higher education institutions would be affected are discussed. (MLW)

  8. Integrated production planning and control: A multi-objective optimization model

    Directory of Open Access Journals (Sweden)

    Cheng Wang

    2013-09-01

    Full Text Available Purpose: Production planning and control has crucial impact on the production and business activities of enterprise. Enterprise Resource Planning (ERP is the most popular resources planning and management system, however there are some shortcomings and deficiencies in the production planning and control because its core component is still the Material Requirements Planning (MRP. For the defects of ERP system, many local improvement and optimization schemes have been proposed, and improve the feasibility and practicality of the plan in some extent, but study considering the whole planning system optimization in the multiple performance management objectives and achieving better application performance is less. The purpose of this paper is to propose a multi-objective production planning optimization model Based on the point of view of the integration of production planning and control, in order to achieve optimization and control of enterprise manufacturing management. Design/methodology/approach: On the analysis of ERP planning system’s defects and disadvantages, and related research and literature, a multi-objective production planning optimization model is proposed, in addition to net demand and capacity, multiple performance management objectives, such as on-time delivery, production balance, inventory, overtime production, are considered incorporating into the examination scope of the model, so that the manufacturing process could be management and controlled Optimally between multiple objectives. The validity and practicability of the model will be verified by the instance in the last part of the paper. Findings: The main finding is that production planning management of manufacturing enterprise considers not only the capacity and materials, but also a variety of performance management objectives in the production process, and building a multi-objective optimization model can effectively optimize the management and control of enterprise

  9. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  10. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  11. Methodological proposal for defining mining vocation in Venezuelan land-use planning; Propuesta metodologica para definir la vocacion minera en el contexto del ordenamiento territorial venezolano

    Energy Technology Data Exchange (ETDEWEB)

    Valladares Salinas, R. Y.; Dall Pozzo, F.; Castillo Padron, A. J.

    2015-07-01

    Mining is an economic activity which is necessary to provide raw materials for the different socio-productive networks of the country. Its application depends on the mineralogical occurrence offered by the geological conditions of an area and requires planning due to the fact that it needs to be located in a geographical space and the environment fragility of this space and the socio-economic and political-institutional legislation at a given moment all have to be taken into account. Therefore, the objective of this research consists of a proposal for a methodological model to define areas with mining adapted to the Venezuelan context of land-use planning, in order to assign mining uses to the most appropriate areas for that goal, considering the selection, assessment and integration of a series of variables and indicators adjusted to the thematic information available. (Author)

  12. A model for effective intergovernmental planning

    International Nuclear Information System (INIS)

    Moore, R.C.

    1991-01-01

    Effective intergovernmental planning processes are essential to the resolution of potential affects created by federal projects. Intergovernmental planning for the proposed Yucca Mountain High-level Nuclear Waste Repository has not been effective to date. In this paper, two successful planning efforts are described. The common elements of these processes are analyzed to provide a model that can be used for the resolution of impacts from other projects. Management authorities of the entities involved should establish a working group to conduct the intergovernmental planning. The parties must identify issues that can be resolved through intergovernmental planning. Clear management authority and direction to the staff participating the planning process is essential. Issues which cannot be resolved should not be included in the goals of the working group. Funding to support the planning process is essential

  13. A Discussion of a Risk-Sharing Pension Plan

    Directory of Open Access Journals (Sweden)

    Catherine Donnelly

    2017-02-01

    Full Text Available I show that risk-sharing pension plans can reduce some of the shortcomings of defined benefit and defined contributions plans. The risk-sharing pension plan presented aims to improve the stability of benefits paid to generations of members, while allowing them to enjoy the expected advantages of a risky investment strategy. The plan does this by adjusting the investment strategy and benefits in response to a changing funding level, motivated by the with-profits contract proposed by Goecke (2013. He suggests a mean-reverting log reserve (or funding ratio, where mean reversion occurs through adjustments to the investment strategy and declared bonuses. To measure the robustness of the plan to human factors, I introduce a measurement of disappointment, where disappointment is high when there are many consecutive years over which benefit payments are declining. Another measure introduced is devastation, where devastation occurs when benefit payments are zero. The motivation is that members of a pension plan who are easily disappointed or likely to get no benefit, are more likely to exit the plan. I find that the risk-sharing plan offers more disappointment than a defined contribution plan, but it eliminates the devastation possible in a plan that tries to accumulate contributions at a steadily increasing rate. The proposed risk-sharing plan can give a narrower range of benefits than in a defined contribution plan. Thus it can offer a stable benefit to members without the risk of running out of money.

  14. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  15. Proposal for a strategic management plan for experimental agricultural and academic farm "El Cairo" of Arauca

    Directory of Open Access Journals (Sweden)

    Elías Nieves

    2014-04-01

    Full Text Available This paper presents a design for a strategic management plan for the Experimental Agricultural and Academic Farm: El Cairo of the Universidad Nacional de Colombia, Orinoquía branch. A non-experimental methodological design was used, from which a situational analysis of the farm was generated, which was used as a basis to formulate and design a Strategic Management plan for a five-year period. It was concluded that the current organization and management plan does not meet the mission objectives of research, teaching, and continuing education, suggesting a need for the articulation of the farm with the administrative and academic structure of the university in carrying out the strategic management plan derived from the current research.

  16. La forma urbana del medio ambiente construido: Hacia una propuesta de estructuración para el instrumento Plan Regulador Comunal. / The urban form of the built environment: towards a proposed structure for the instrument Communal Regulating Plan.

    Directory of Open Access Journals (Sweden)

    Cárdenas Jirón, Luz Alicia

    2000-08-01

    Full Text Available La forma urbana del medio ambiente construido es el elemento central de este artículo, abordado desde dos perspectivas: en primer lugar la crítica de la forma urbana resultante de un instrumento de planificación y en segundo lugar una propuesta de estructuración de la forma urbana para el Plan Regulador Comunal. Con este objeto, se presenta un modelo cartográfico para entregar una pauta metodológica de los aspectos relevantes a la forma urbana que debieran tomarse en cuenta al momento de planificar y gestionar la ciudad. /The urban form of the built environment is the core element of this article. Two approaches have been developed to deal with it, firstly, a criticism of the urban form as a result of the town planning instrument and secondly a proposal to structure the urban form for Plan Regulador Comunal. Given that a cartographic model is showed as an example to deal with relevant issues in relation to the urban form. The model tries to give a methodological guide to the urban planners and managers.

  17. 76 FR 78942 - Draft Environmental Impact Statement and Proposed Vernal Pool Habitat Conservation Plan for the...

    Science.gov (United States)

    2011-12-20

    ... activities associated with urban development activities. We also announce plans for a public scoping meeting... planning area and their possible impacts on the species; 5. The presence of archeological sites, buildings...

  18. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  19. Hanford year 2000 Business Continuity Plan

    International Nuclear Information System (INIS)

    VORNEY, S.V.

    1999-01-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones

  20. Handling uncertainty through adaptiveness in planning approaches

    NARCIS (Netherlands)

    Zandvoort, M.; Vlist, van der M.J.; Brink, van den A.

    2018-01-01

    Planners and water managers seek to be adaptive to handle uncertainty through the use of planning approaches. In this paper, we study what type of adaptiveness is proposed and how this may be operationalized in planning approaches to adequately handle different uncertainties. We took a

  1. Energy in the french and dutch Green plans: an instructive comparison

    Energy Technology Data Exchange (ETDEWEB)

    Hatem, F.

    1990-11-01

    In this article, while recognizing that the French Environment Plan has the merit of proposing, for the first time, an overview of the pollution problems to be tackled, the author however sets down a number of provisions in this regard. Through an examination of the three parts of the plan (the stakes and the findings, the goals, ways and means), he illustrates his point of view with the support of a detailed analysis of the proposals concerning energy. The comparison which he makes with the proposals contained in the Dutch Green Plan highlights the points which need to be reflected upon thoroughly in France. With relation to the rigor, the clarity, the accuracy, the seriousness of the assessments in the Dutch Plan, the author finds that the French Plan lacks a ranking of goals, a discussion of ways and means to be deployed, an adequate economic and financial framework, and it tends to prefer discourse to analysis and preconception to demonstration. This document is only an initial sketch; a real action plan still remains to be prepared.

  2. Self-guided training for deep brain stimulation planning using objective assessment.

    Science.gov (United States)

    Holden, Matthew S; Zhao, Yulong; Haegelen, Claire; Essert, Caroline; Fernandez-Vidal, Sara; Bardinet, Eric; Ungi, Tamas; Fichtinger, Gabor; Jannin, Pierre

    2018-04-04

    Deep brain stimulation (DBS) is an increasingly common treatment for neurodegenerative diseases. Neurosurgeons must have thorough procedural, anatomical, and functional knowledge to plan electrode trajectories and thus ensure treatment efficacy and patient safety. Developing this knowledge requires extensive training. We propose a training approach with objective assessment of neurosurgeon proficiency in DBS planning. To assess proficiency, we propose analyzing both the viability of the planned trajectory and the manner in which the operator arrived at the trajectory. To improve understanding, we suggest a self-guided training course for DBS planning using real-time feedback. To validate the proposed measures of proficiency and training course, two experts and six novices followed the training course, and we monitored their proficiency measures throughout. At baseline, experts planned higher quality trajectories and did so more efficiently. As novices progressed through the training course, their proficiency measures increased significantly, trending toward expert measures. We developed and validated measures which reliably discriminate proficiency levels. These measures are integrated into a training course, which quantitatively improves trainee performance. The proposed training course can be used to improve trainees' proficiency, and the quantitative measures allow trainees' progress to be monitored.

  3. Path Planning with a Lazy Significant Edge Algorithm (LSEA

    Directory of Open Access Journals (Sweden)

    Joseph Polden

    2013-04-01

    Full Text Available Probabilistic methods have been proven to be effective for robotic path planning in a geometrically complex environment. In this paper, we propose a novel approach, which utilizes a specialized roadmap expansion phase, to improve lazy probabilistic path planning. This expansion phase analyses roadmap connectivity information to bias sampling towards objects in the workspace that have not yet been navigated by the robot. A new method to reduce the number of samples required to navigate narrow passages is also proposed and tested. Experimental results show that the new algorithm is more efficient than the traditional path planning methodologies. It was able to generate solutions for a variety of path planning problems faster, using fewer samples to arrive at a valid solution.

  4. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  5. Development of a nurse case management service: a proposed business plan for rural hospitals.

    Science.gov (United States)

    Adams, Marsha Howell; Crow, Carolyn S

    2005-01-01

    The nurse case management service (NCMS) for rural hospitals is an entrepreneurial endeavor designed to provide rural patients with quality, cost-effective healthcare. This article describes the development of an NCMS. A detailed marketing and financial plan, a review of industry trends, and the legal structure and risks associated with the development of the venture are presented. The financial plan projects a minimum savings of 223,200 dollars for rural institutions annually. To improve quality and reduce cost for rural hospitals, the authors recommend implementation of an NCMS.

  6. Innovation Cycles Concerning Strategic Planning of Product-Service-Systems

    OpenAIRE

    Hepperle, Clemens;Mörtl, Markus;Lindemann, Udo

    2017-01-01

    This paper proposes a research program for identifying, understanding and describing innovation cycles concerning strategic planning of product-service-systems. A general overview about the background of cycle management in innovation processes, which the proposed research program is part of, is given before focusing cycles concerning strategic planning. As companies offer more and more complex products in order to satisfy market needs, the innovation process of such products becomes also mor...

  7. Endangered Species and North American Waterfowl Management Plan Joint Venture Areas

    National Research Council Canada - National Science Library

    Allred, Karla

    1996-01-01

    ...) Endangered Species Recovery Plans that meet the recovery plan requirements; and the percent of Corps acreage included within North American Waterfowl Management Joint Venture Implementation Plans where proposed work has been accomplished...

  8. 78 FR 71532 - Amendments to Material Control and Accounting Regulations and Proposed Guidance for Fuel Cycle...

    Science.gov (United States)

    2013-11-29

    ... Accounting Regulations and Proposed Guidance for Fuel Cycle Facility Material Control and Accounting Plans... material control and accounting (MC&A) of special nuclear material (SNM) and the proposed guidance... and how the NRC will review and inspect these plans. DATES: The public meeting will be held on...

  9. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  10. A strategic planning methodology for aircraft redesign

    Science.gov (United States)

    Romli, Fairuz Izzuddin

    Due to a progressive market shift to a customer-driven environment, the influence of engineering changes on the product's market success is becoming more prominent. This situation affects many long lead-time product industries including aircraft manufacturing. Derivative development has been the key strategy for many aircraft manufacturers to survive the competitive market and this trend is expected to continue in the future. Within this environment of design adaptation and variation, the main market advantages are often gained by the fastest aircraft manufacturers to develop and produce their range of market offerings without any costly mistakes. This realization creates an emphasis on the efficiency of the redesign process, particularly on the handling of engineering changes. However, most activities involved in the redesign process are supported either inefficiently or not at all by the current design methods and tools, primarily because they have been mostly developed to improve original product development. In view of this, the main goal of this research is to propose an aircraft redesign methodology that will act as a decision-making aid for aircraft designers in the change implementation planning of derivative developments. The proposed method, known as Strategic Planning of Engineering Changes (SPEC), combines the key elements of the product redesign planning and change management processes. Its application is aimed at reducing the redesign risks of derivative aircraft development, improving the detection of possible change effects propagation, increasing the efficiency of the change implementation planning and also reducing the costs and the time delays due to the redesign process. To address these challenges, four research areas have been identified: baseline assessment, change propagation prediction, change impact analysis and change implementation planning. Based on the established requirements for the redesign planning process, several methods and

  11. New Structure of Emergency Response Plan in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Cavlina, N.

    1998-01-01

    The new structure of a national emergency response plan in the case of nuclear accident is based on general requirements of modernization according to international recommendations, with a new Technical Support Center as a so-called lead technical agency, with the plan adapted to the organization of the Civil Protection, with all necessary elements of preparedness for the event of a nuclear accident in Krsko NPP and Paks NPP and with such a plan of procedures that will, to greatest possible extent, be compatible with the existing plan in neighboring countries Slovenia and Hungary. The main requirement that direct s a new organization scheme for taking protective actions in the event of a nuclear accident, is the requirement of introducing a Technical Support Center. The basic role of TSC is collecting data and information on nuclear accident, analyzing and estimating development of an accident, and preparing proposals for taking protective actions and for informing the public. TSC is required to forward those proposals to the Civil Protection, which on the basis of evaluation of proposals makes decisions on implementation and surveillance of implementation of protective measures. (author)

  12. Monitored retrievable storage program. Status and plans for meeting NWPA requirements

    International Nuclear Information System (INIS)

    Hall, R.J.; Fletcher, J.F.

    1983-12-01

    Accomplishments of the Monitored Retrieval Storage (MRS) Program since passage of the Nuclear Waste Policy Act of 1982 (NWPA) are as follows: (1) R and D needs report was submitted; (2) conceptual design analysis of 8 MRS concepts was performed; (3) selection of two MRS concepts (primary, alternative) are underway; (4) Parson/Westinghouse/Golder were selected as architect-engineer; (5) functional design criteria were established; (6) reports to accompany proposal were defined; and (7) evaluations of mission, cost-effectiveness, deployment time were performed. Future work, plans and schedule include completion of facility advanced conceptual design and accompanying design reports in early 1985, for submittal with proposal in June. Designs are being prepared for the primary concept, and in less detail, for the alternate. Three separate site locations will be assumed for each concept. A siting plan, to accompany the proposal, will also be completed in early 1985, as will an environmental assessment now under preparation. It is planned that the proposal be accompanied by several reports augmenting the planning base for post-proposal actions, to be activated at the time MRS deployment is authorized by Congress. 9 figures

  13. Public deliberation in municipal planning

    DEFF Research Database (Denmark)

    Bohøj, Morten; Borchorst, Nikolaj Gandrup; Bødker, Susanne

    2011-01-01

    This paper reports on an exploratory participatory design process aimed at supporting citizen deliberation in municipal planning. It presents the main outcomes of this process in terms of selected prototypes and an approach to the use setting. We support and discuss different ways for citizens...... to act and reflect on proposed plans: in-situ, while physically close to the planning object, and ex-situ, when citizens are remote from this. The support of in-situ and ex-situ participation allows citizens to engage in continuous reflection-in and on-action as a collaborative activity with other...

  14. Analysis of velocity planning interpolation algorithm based on NURBS curve

    Science.gov (United States)

    Zhang, Wanjun; Gao, Shanping; Cheng, Xiyan; Zhang, Feng

    2017-04-01

    To reduce interpolation time and Max interpolation error in NURBS (Non-Uniform Rational B-Spline) inter-polation caused by planning Velocity. This paper proposed a velocity planning interpolation algorithm based on NURBS curve. Firstly, the second-order Taylor expansion is applied on the numerator in NURBS curve representation with parameter curve. Then, velocity planning interpolation algorithm can meet with NURBS curve interpolation. Finally, simulation results show that the proposed NURBS curve interpolator meet the high-speed and high-accuracy interpolation requirements of CNC systems. The interpolation of NURBS curve should be finished.

  15. Resection planning for robotic acoustic neuroma surgery

    Science.gov (United States)

    McBrayer, Kepra L.; Wanna, George B.; Dawant, Benoit M.; Balachandran, Ramya; Labadie, Robert F.; Noble, Jack H.

    2016-03-01

    Acoustic neuroma surgery is a procedure in which a benign mass is removed from the Internal Auditory Canal (IAC). Currently this surgical procedure requires manual drilling of the temporal bone followed by exposure and removal of the acoustic neuroma. This procedure is physically and mentally taxing to the surgeon. Our group is working to develop an Acoustic Neuroma Surgery Robot (ANSR) to perform the initial drilling procedure. Planning the ANSR's drilling region using pre-operative CT requires expertise and around 35 minutes' time. We propose an approach for automatically producing a resection plan for the ANSR that would avoid damage to sensitive ear structures and require minimal editing by the surgeon. We first compute an atlas-based segmentation of the mastoid section of the temporal bone, refine it based on the position of anatomical landmarks, and apply a safety margin to the result to produce the automatic resection plan. In experiments with CTs from 9 subjects, our automated process resulted in a resection plan that was verified to be safe in every case. Approximately 2 minutes were required in each case for the surgeon to verify and edit the plan to permit functional access to the IAC. We measured a mean Dice coefficient of 0.99 and surface error of 0.08 mm between the final and automatically proposed plans. These preliminary results indicate that our approach is a viable method for resection planning for the ANSR and drastically reduces the surgeon's planning effort.

  16. Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and Reference Document

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1994-12-22

    The Compliance Plan Volume provides overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) and contains procedures to establish milestones to be enforced under the Order. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume and is provided for informational purposes only.

  17. 42 CFR 84.40 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  18. 30 CFR 28.30 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  19. 18F-Fdg-PET-guided Planning and Re-Planning (Adaptive) Radiotherapy in Head and Neck Cancer: Current State of Art.

    Science.gov (United States)

    Farina, Eleonora; Ferioli, Martina; Castellucci, Paolo; Farina, Arianna; Zanirato Rambaldi, Giuseppe; Cilla, Savino; Cammelli, Silvia; Fanti, Stefano; Morganti, Alessio G

    2017-12-01

    A review of the literature is proposed as a contribution to current knowledge on technical, physical, and clinical issues about PET-guided planning and re-planning radiotherapy (RT) in head and neck cancer. PubMed and Scopus electronic databases were searched for articles including clinical trials. Search terms were "gross tumor volume (GTV) delineation", "head and neck cancer", "radiotherapy", "adaptive radiotherapy" in combination with "PET". A 18 F-FDG-PET and CT-scan comparison in GTV definition for RT planning of head and neck cancer was shown in twenty-seven clinical trials with a total of 712 patients. Only two clinical trials focused on PET-guided adaptive radiotherapy (ART) with a total of 31 patients. 18 F-FDG-PET is able to achieve an accurate and precise definition of GTV boundaries during RT planning, especially in combination with CT-scan. ART strategies are proposed to evaluate tumor volume changes, plan boost irradiation on metabolically active residual neoplasm and protect organs at risk (OaRs). Copyright© 2017, International Institute of Anticancer Research (Dr. George J. Delinasios), All rights reserved.

  20. Study of a proposal for the insertion of operational experience as a tool for support the training plan for nuclear power plants

    International Nuclear Information System (INIS)

    Fonseca, Renato Alves da

    2009-05-01

    The main objectives of this work are: to determine, through the operational experience analysis of Angra 1 nuclear power plant, the plant operational vulnerabilities that affect its staff training and to propose a modeling to plan a training program to address these vulnerabilities. This analysis utilizes the Angra 1 document entitled 'Ocorrencia de Relato Obrigatorio', which reports the plant event occurrences. Through this document, as well as the opinion of specialists on the most probably root causes of the reported events, the backdrop of the operational experience analysis of internal events was built. The modeling using the SAT method and has as a guideline the internal operational experience analysis. Moreover, this modeling encompasses techniques of event and second generation human reliability analysis, both specific of the nuclear area. The development of this work shows that: the internal operational experience analysis provides a realistic view of the vulnerabilities present in the plant in all areas (technical and organizational), which must be addressed to the plan of the training program and the modeling, based on realistic view of the plant, is dynamic, not linear, and is always up to date on events in the plant, its causes and consequences. (author)

  1. TARP Monthly Housing Scorecard

    Data.gov (United States)

    Department of the Treasury — Treasury and the U.S. Department of Housing and Urban Development (HUD) jointly produce a Monthly Housing Scorecard on the health of the nation’s housing market. The...

  2. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  3. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  4. 76 FR 28043 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2011-05-13

    ... Support Enforcement (OCSE) in monitoring and evaluating State Child Support programs. OCSE is proposing... coverage plans, and cash medical support. Further legislative or regulatory changes may be necessary to...

  5. The emergency plan of the ININ

    International Nuclear Information System (INIS)

    Ruiz C, M.A.

    1991-01-01

    The emergency plan of the ININ, it was elaborated in 1988 and revised by the National Commission of Nuclear Safety and Safeguards (CNSNS) in 1989. At the beginning of 1990 and with the support of the IAEA it was practiced the first revision to the text of this plan, for what the proposal revision is what constitutes the development of this report

  6. Major planning enquiries

    Energy Technology Data Exchange (ETDEWEB)

    Shore, P

    1978-11-01

    This is a speech delivered by the U.K. Secretary of State for the Environment in Manchester (UK) on September 13th 1978. It outlines the Minister's views on the role and significance of major planning inquiries - such as that proposed to be held on the Commercial Demonstration Fast Reactor. (CDFR) (author).

  7. Preliminary Validation and Verification Plan for CAREM Reactor Protection System; Modelo de Plan Preliminar de Validacion y Verificacion para el Sistema de Proteccion del Reactor CAREM

    Energy Technology Data Exchange (ETDEWEB)

    Fittipaldi, Ana; Felix, Maciel [Comision Nacional de Energia Atomica, Centro Atomico Bariloche (Argentina)

    2000-07-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan.

  8. TECHNIQUE OF OPTIMAL AUDIT PLANNING FOR INFORMATION SECURITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    F. N. Shago

    2014-03-01

    Full Text Available Complication of information security management systems leads to the necessity of improving the scientific and methodological apparatus for these systems auditing. Planning is an important and determining part of information security management systems auditing. Efficiency of audit will be defined by the relation of the reached quality indicators to the spent resources. Thus, there is an important and urgent task of developing methods and techniques for optimization of the audit planning, making it possible to increase its effectiveness. The proposed technique gives the possibility to implement optimal distribution for planning time and material resources on audit stages on the basis of dynamics model for the ISMS quality. Special feature of the proposed approach is the usage of a priori data as well as a posteriori data for the initial audit planning, and also the plan adjustment after each audit event. This gives the possibility to optimize the usage of audit resources in accordance with the selected criteria. Application examples of the technique are given while planning audit information security management system of the organization. The result of computational experiment based on the proposed technique showed that the time (cost audit costs can be reduced by 10-15% and, consequently, quality assessments obtained through audit resources allocation can be improved with respect to well-known methods of audit planning.

  9. Nuclear emergency plans in France. Strengths and weaknesses. Report 2016

    International Nuclear Information System (INIS)

    Boilley, David; Josset, Mylene

    2016-01-01

    This report first presents nuclear emergency plans in France (specific intervention plans, action at the municipal level, creation of a national plan, planning of the post-accidental phase, integration of the international and cross-border dimension. Then, it analyses strengths and weaknesses of these plans. It outlines the necessity to take the most severe accident scenarios into account (issue of selection of reference accidents, necessity of reviewing emergency planning areas, and assessment of the number of inhabitants about French nuclear installations). It proposes a review of measures of protection of populations (information, sheltering, iodine-based prophylaxis, evacuation, food control and restrictions, protection of human resources, cross-border problems). It discusses how to put an end to the emergency situation, and the assessment and collaboration on emergency plans. The next part proposes an analysis of noticed strengths and weaknesses in some PPIs (specific intervention plans) in terms of text accessibility, of description of the site and of its environment, of intervention area, of operational measures, and of preparation to the post-accidental phase

  10. Scenario Planning as Organizational Intervention

    DEFF Research Database (Denmark)

    Balarezo, Jose; Nielsen, Bo Bernhard

    2017-01-01

    existing contributions on scenario planning within a new consolidating framework that includes antecedents, processes, and outcomes. The proposed framework allows for integration of the extant literature on scenario planning from a wide variety of fields, including strategic management, finance, human...... resource management, operations management, and psychology. Findings: This study contributes to research by offering a coherent and consistent framework for understanding scenario planning as a dynamic process. As such, it offers future researchers with a systematic way to ascertain where a particular......Purpose: This paper identifies four areas in need of future research to enhance our theoretical understanding of scenario planning, and sets the basis for future empirical examination of its effects on individual and organizational level outcomes. Design/methodology/approach: This paper organizes...

  11. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  12. Complex systems, evolutionary planning?

    NARCIS (Netherlands)

    Bertolini, L.; de Roo, G.; Silva, E.A.

    2010-01-01

    Coping with uncertainty is a defining challenge for spatial planners. Accordingly, most spatial planning theories and methods are aimed at reducing uncertainty. However, the question is what should be done when this seems impossible? This chapter proposes an evolutionary interpretation of spatial

  13. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  14. Hanford year 2000 Business Continuity Plan

    Energy Technology Data Exchange (ETDEWEB)

    ROGGENKAMP, S.L.

    1999-11-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones.

  15. MOPSO-based multi-objective TSO planning considering uncertainties

    DEFF Research Database (Denmark)

    Wang, Qi; Zhang, Chunyu; Ding, Yi

    2014-01-01

    factors, i.e. load growth, generation capacity and line faults, and aims to enhance the transmission system via the multi-objective TSO planning (MOTP) approach. The proposed MOTP approach optimizes three objectives simultaneously, namely the probabilistic available transfer capability (PATC), investment...... cost and power outage cost. A two-phase MOPSO algorithm is employed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity ofPareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach...

  16. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    International Nuclear Information System (INIS)

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-01-01

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  17. 77 FR 43350 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the San Diego Unified...

    Science.gov (United States)

    2012-07-24

    ... impacts, as described in the applicant's habitat conservation plan (plan). We request data, comments, and..., the Carroll Canyon Preserve on the east and south, and aggregate mining operations on the west. The... compliance with all applicable California Department of Education School Development Guidelines (guidelines...

  18. 76 FR 31647 - Joint Industry Plan; Notice of Filing of a National Market System Plan to Address Extraordinary...

    Science.gov (United States)

    2011-06-01

    ... MSCI Hong Kong Index Fund. EWI iShares MSCI Italy Index Fund. EWJ iShares MSCI Japan Index Fund. EWK i... Plan Not applicable. H. Terms and Conditions of Access Section II(C) of the proposed Plan provides that... May 6, 2010, staff of the Commission and the SROs have been working on a variety of initiatives to...

  19. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  20. Green cloud environment by using robust planning algorithm

    Directory of Open Access Journals (Sweden)

    Jyoti Thaman

    2017-11-01

    Full Text Available Cloud computing provided a framework for seamless access to resources through network. Access to resources is quantified through SLA between service providers and users. Service provider tries to best exploit their resources and reduce idle times of the resources. Growing energy concerns further makes the life of service providers miserable. User’s requests are served by allocating users tasks to resources in Clouds and Grid environment through scheduling algorithms and planning algorithms. With only few Planning algorithms in existence rarely planning and scheduling algorithms are differentiated. This paper proposes a robust hybrid planning algorithm, Robust Heterogeneous-Earliest-Finish-Time (RHEFT for binding tasks to VMs. The allocation of tasks to VMs is based on a novel task matching algorithm called Interior Scheduling. The consistent performance of proposed RHEFT algorithm is compared with Heterogeneous-Earliest-Finish-Time (HEFT and Distributed HEFT (DHEFT for various parameters like utilization ratio, makespan, Speed-up and Energy Consumption. RHEFT’s consistent performance against HEFT and DHEFT has established the robustness of the hybrid planning algorithm through rigorous simulations.

  1. 75 FR 35843 - Proposed Extension of Information Collection Request Submitted for Public Comment; Form 5500...

    Science.gov (United States)

    2010-06-23

    ... welfare plans (collectively referred to as employee benefit plans) to file returns or reports annually... DEPARTMENT OF LABOR Employee Benefits Security Administration Proposed Extension of Information Collection Request Submitted for Public Comment; Form 5500, Annual Return/Report of Employee Benefit Plan...

  2. Risk Analysis for the Different Consolidation Proposals

    CERN Document Server

    Strait, J

    2009-01-01

    In parallel with the repairs in sector 34, improvements are planned to a number of systems, to allow safe detection of faults similar to the one which caused the incident of 19 September, and to limit the damage should a similar incident nonetheless occur. These include improved bus and quench detection systems, improved pressure relief for the insulating and beam vacuum systems, and improved anchoring of the SSS to the tunnel floor. Not all of the planned mitigations, however, may be fully implemented before the restart of the LHC in 2009. I will review the potential benefits of partial or complete implementation of each of the planned improvements, individually or together with others, and conversely the potential risks (consequences) of delayed implementation. I will also review the risks that remain even after the planned consolidation is complete. Considering all proposals and the different risks, I will comment on what would be the best strategy for consolidation, and on the strategy for operations unde...

  3. Environmental impact assessment of the proposed Information Technology Park at Perungudi.

    Science.gov (United States)

    Sharmilaa, G

    2007-10-01

    Environmental impact assessment studies of the proposed Information Technology Park at Perungudi have been carried out. The study involved assessing the existing environmental quality of the proposed site, and predicting impacts and preparing an environmental management plan. Data on the existing quality of water, soil, land use pattern, air, noise and socio-economic details of the proposed project were assessed. The impacts due to the proposed activity were identified and evaluated using the Network Impact Methodology. The water requirement was found to be 3,63,400 L/day. The total wastewater likely to be generated was found to be 2,90,720 L/day. The wastewater will be treated in a sewage treatment plant. The generation of solid waste was assessed to about 500 kg/day. Increase in traffic level was found out by traffic survey. The socio-economic environment will have a positive impact from the proposed project. An Environmental Management Plan was prepared which includes the mitigation measures for improving the eco-profile of the study area.

  4. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  5. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  6. 78 FR 69933 - Submission for OMB Review; Comment Request

    Science.gov (United States)

    2013-11-21

    ... pertaining to their executive compensation and corporate governance practices. Affected public: Private... under TARP will be subject to specified executive compensation and corporate governance standards...

  7. Writing a successful business plan: an overview.

    Science.gov (United States)

    Haag, Annette B

    2013-01-01

    In creating and building a business, the entrepreneur assumes all the responsibilities for development and management, as well as the risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished plan communicates the product or service to others and provides the basis for the financial proposal. Copyright 2013, SLACK Incorporated.

  8. 77 FR 3236 - Proposed Collection; Comment Request

    Science.gov (United States)

    2012-01-23

    ... survey results will also be used to measure the goals and initiatives of the Community Strategic Plan...; Comment Request AGENCY: Office of the Under Secretary of Defense (Personnel and Readiness), DoD. ACTION... Office of the Under Secretary of Defense (Personnel and Readiness) announces the following proposed new...

  9. Optimized LTE Cell Planning with Varying Spatial and Temporal User Densities

    KAUST Repository

    Ghazzai, Hakim; Yaacoub, Elias; Alouini, Mohamed-Slim; Dawy, Zaher; Abu Dayya, Adnan

    2015-01-01

    Base station deployment in cellular networks is one of the fundamental problems in network design. This paper proposes a novel method for the cell planning problem for the fourth generation (4G) cellular networks using meta-heuristic algorithms. In this approach, we aim to satisfy both cell coverage and capacity constraints simultaneously by formulating an optimization problem that captures practical planning aspects. The starting point of the planning process is defined through a dimensioning exercise that captures both coverage and capacity constraints. Afterwards, we implement a meta-heuristic algorithm based on swarm intelligence (e.g., particle swarm optimization or the recently-proposed grey wolf optimizer) to find suboptimal base station locations that satisfy both problem constraints in the area of interest which can be divided into several subareas with different spatial user densities. Subsequently, an iterative approach is executed to eliminate eventual redundant base stations. We also perform Monte Carlo simulations to study the performance of the proposed scheme and compute the average number of users in outage. Next, the problems of green planning with regards to temporal traffic variation and planning with location constraints due to tight limits on electromagnetic radiations are addressed, using the proposed method. Finally, in our simulation results, we apply our proposed approach for different scenarios with different subareas and user distributions and show that the desired network quality of service targets are always reached even for large-scale problems.

  10. Optimized LTE Cell Planning with Varying Spatial and Temporal User Densities

    KAUST Repository

    Ghazzai, Hakim

    2015-03-09

    Base station deployment in cellular networks is one of the fundamental problems in network design. This paper proposes a novel method for the cell planning problem for the fourth generation (4G) cellular networks using meta-heuristic algorithms. In this approach, we aim to satisfy both cell coverage and capacity constraints simultaneously by formulating an optimization problem that captures practical planning aspects. The starting point of the planning process is defined through a dimensioning exercise that captures both coverage and capacity constraints. Afterwards, we implement a meta-heuristic algorithm based on swarm intelligence (e.g., particle swarm optimization or the recently-proposed grey wolf optimizer) to find suboptimal base station locations that satisfy both problem constraints in the area of interest which can be divided into several subareas with different spatial user densities. Subsequently, an iterative approach is executed to eliminate eventual redundant base stations. We also perform Monte Carlo simulations to study the performance of the proposed scheme and compute the average number of users in outage. Next, the problems of green planning with regards to temporal traffic variation and planning with location constraints due to tight limits on electromagnetic radiations are addressed, using the proposed method. Finally, in our simulation results, we apply our proposed approach for different scenarios with different subareas and user distributions and show that the desired network quality of service targets are always reached even for large-scale problems.

  11. 76 FR 30182 - Notice of Submission of Proposed Information Collection to OMB Section 5(h) Homeownership Program...

    Science.gov (United States)

    2011-05-24

    ... Its Proposed Use: Public Housing Agencies (PHAs) maintain sales and financial records of their plan... comments on the subject proposal. Public Housing Agencies (PHAs) maintain sales and financial records of their plan. Residents may apply to PHAs to purchase units. DATES: Comments Due Date: June 23, 2011...

  12. A new plan quality index for nasopharyngeal cancer SIB IMRT.

    Science.gov (United States)

    Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C

    2014-02-01

    A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  13. Evaluating the role of ecosystem serivces in participatory land use planning: proposing a balanced score card

    NARCIS (Netherlands)

    Fürst, C.; Opdam, P.; Inostroza, L.; Luque, S.

    2014-01-01

    The application of the ecosystem services (ES) concept in land use planning has great potential to enhance the awareness of planning actors on their interactions. At the same time it can contribute to improve the linkage between the role of land use patterns and the understanding of land system

  14. Optimizing Re-planning Operation for Smart House Applying Solar Radiation Forecasting

    Directory of Open Access Journals (Sweden)

    Atsushi Yona

    2014-08-01

    Full Text Available This paper proposes the re-planning operation method using Tabu Search for direct current (DC smart house with photovoltaic (PV, solar collector (SC, battery and heat pump system. The proposed method is based on solar radiation forecasting using reported weather data, Fuzzy theory and Recurrent Neural Network. Additionally, the re-planning operation method is proposed with consideration of solar radiation forecast error, battery and inverter losses. In this paper, it is assumed that the installation location for DC smart house is Okinawa, which is located in Southwest Japan. The validity of proposed method is confirmed by comparing the simulation results.

  15. Strategic planning model for Startups: A case study of Iranian packaging industry

    Directory of Open Access Journals (Sweden)

    Mohammad Mahdavi Mazdeh

    2011-04-01

    Full Text Available In today’s turbulent and competitive world, strategic planning plays an important role for the success of firms. Despite the fact that there are literally numerous models proposed for different companies in various states and structures, the possibility of using strategic planning for startups has never been seriously considered. In this paper, we present a survey by asking experts to find out whether strategic planning is suitable for startups. We also propose a model for strategic planning in startups based on the strategic planning models for small businesses and entrepreneurship concepts. The model is similar to other models and what differentiates this models form other approaches is the methodology used for internal and external analysis and the parameters taken into consideration. The proposed model is examined on an Iranian food packaging industry for validation. The preliminary results indicate that the success of startups depends on two sets of parameters: “entrepreneurial opportunities” and “competitive advantages and entrepreneurial characteristics”.

  16. Planning and support materials in teaching story comprehension from the interbehavioral approach

    Directory of Open Access Journals (Sweden)

    Ana Cristina Mascareño Bórquez

    2017-12-01

    Full Text Available Despite the latest changes in educational reforms within the country, curriculum plans and ongoing program renewals aimed at resolving the educational gap reflected in national statistics, the results remain unfavorable. This leads to reflection and analysis to generate and implement new forms and teaching strategies. The purpose of this paper is to present the design of an alternative proposal for planning and the development of support materials, developed according to the second block of sixth grade primary education, in two expected learning contained in the formal basic education curriculum. Centered on the interaction in teaching-learning and according to different levels of functional aptitude. Subsequently it underwent a process of piloting and revision by experts to prove the pertinence of the planning and precisions for its implementation. As results, the support materials and the planning proposal are presented and discussed with the authors who have worked on planning proposals from the inter-behavioral approach.

  17. Evolution of the Birth Plan

    OpenAIRE

    Kaufman, Tamara

    2007-01-01

    Many birth professionals are discarding the birth plan as an outdated and ineffectual document. This column discusses the past limitations and present uses of the birth plan in an effort to enhance current teaching on how expectant parents can write and use this important document. Encouraging expectant parents to prepare two separate, but corresponding, birth plans—the “Discussion Birth Plan” and the “Hospital Birth Plan”—is proposed. Teaching suggestions and possible implications are explor...

  18. Reagan proposes cuts in synfuel aid, transfer to Synfuels Corp. from DOE

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-02

    It is reported that U.S. president Ronald Reagan in his budget message for the financial year 1982, has proposed to cut the DOE's planned 1982 expenditure for the synfuels programme by $864 m. He also proposed that the government synfuels effort be transferred to the recently created Synthetic Fuels Corporation. The gasohol programme and biomass development have suffered by the termination of feasibility studies, co-operative agreements and loan guarantee, but the planned tax credits will continue in the case of gasohol, resulting in a subsidy in excess of $18/bbl.

  19. 40 CFR 230.94 - Planning and documentation.

    Science.gov (United States)

    2010-07-01

    ... confidential for business purposes, such as the exact location of a proposed mitigation site that has not yet..., type, and location of any proposed compensatory mitigation, including any out-of-kind compensation, or... plans must be conducted in accordance with the terms and conditions of those permits and applicable...

  20. Scenario tree airline fleet planning for demand uncertainty

    NARCIS (Netherlands)

    Repko, M.G.J.; Lopes dos Santos, Bruno F.

    2017-01-01

    This paper proposes an innovative multi-period modeling approach to solve the airline fleet planning problem under demand uncertainty. The problem is modeled using a scenario tree approach. The tree is composed of nodes, which represent points of decision in multiple time stages of the planning

  1. Writing a successful business plan.

    Science.gov (United States)

    Haag, A B

    1997-01-01

    1. In creating and building a business, the entrepreneur assumes all the responsibilities for its development and management, as well as the risks and risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. 2. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished product communicates the product/service to others and provides the basis for the financial proposal. 3. Planning helps identify customers, market area, pricing strategy, and competitive conditions. It aids in decision making and is an essential guide for operating a business successfully and measuring progress. 4. The business plan not only serves as a mechanism for obtaining any needed financial resources, but also indicates the future direction of the company.

  2. BUSINESS PLANS INFORMED BY DESIGN

    DEFF Research Database (Denmark)

    Petersen, Sørren Ingomar; Heebøll, John

    2011-01-01

    Today the value created by applying design at a business model and innovation level as opposed to a design and process level is marginal. Interviews with product developers from academia and industry suggest this is due to a lack of design perspective when formulating and evaluating business plans...... types. These were the design of products based on sustainable and on disruptive technologies. In conclusion, we recommend a procedure to align and translate business plan content into inspirational design briefs for enhancing design concept synthesis performance........ To remedy this, we propose including Design Quality Criteria drivers in the formulation of business plans. While auditing entrepreneurial business plans and design briefs content gaps were revealed between them. Strategy and context differences as well as a negative correlation between investors’ business...

  3. Proposed Hydro-Quebec development plan, 1990-1992: Horizon 1999

    International Nuclear Information System (INIS)

    1990-01-01

    The supply and demand for electric power in Quebec are reviewed and forecasts of future demand are established, using various scenarios of demographic, economic, and energy development. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. In addition, objectives and strategies are presented for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 36 figs., 54 tabs

  4. Statistical methods for the planning of inspections

    International Nuclear Information System (INIS)

    Hough, C.G.; Beetle, T.M.

    1976-01-01

    Inspection plans are designed to detect diversions of M kilograms of nuclear material with a high degree of confidence. Attribute sample plans were first developed and applied at a zero-energy fast reactor in the United Kingdom in co-operation with the Agency. Battelle-Northwest in the United States of America proposed a variables sample plan based on decision theory. The Karlsruhe Research Center in the Federal Republic of Germany developed the strategic points concept and sample plans based on game theory considerations. All these approaches were combined into a common approach which is summarized in this report. (author)

  5. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  6. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  7. Integration of LUTI models into sustainable urban mobility plans (SUMPs

    Directory of Open Access Journals (Sweden)

    Nikolaos Gavanas

    2016-06-01

    Full Text Available A literature review indicates that there is an increasing number of Land Use/Transport Interaction (LUTI models being used in policy analysis and support of urban land use, transport and environmental planning. In this context, LUTI models are considered to be useful for the development of scenarios during the preparatory stage of Sustainable Urban Mobility Plans (SUMPs. A SUMP can be defined as a strategic planning framework, proposed by the European Commission, for planning and design of an urban multimodal transport system, which combines multi-disciplinary policy analysis and decision making. The objective of a SUMP is to achieve sustainable urban mobility, i.e. accessibility for all, safety and security, reduction in emissions and energy consumption, efficient and cost-effective transport and an improvement in the urban environment. Based on the overall conceptual and methodological framework of LUTI models (Geurs and van Wee 2004, the scope of the proposed research is to fully integrate a LUTI model into a contemporary transport planning framework and, more specifically, into the SUMP structure. This paper focuses on the configuration of the integration pattern, according to which a LUTI model may evolve and interact with the planning process throughout the eleven elements of the SUMP, as well as the evaluation of the benefits and drawbacks from the implementation of the proposed pattern for the enhancement of SUMP and overall promotion of sustainable urban planning.

  8. Improving IMRT delivery efficiency with reweighted L1-minimization for inverse planning

    International Nuclear Information System (INIS)

    Kim, Hojin; Becker, Stephen; Lee, Rena; Lee, Soonhyouk; Shin, Sukyoung; Candès, Emmanuel; Xing Lei; Li Ruijiang

    2013-01-01

    Purpose: This study presents an improved technique to further simplify the fluence-map in intensity modulated radiation therapy (IMRT) inverse planning, thereby reducing plan complexity and improving delivery efficiency, while maintaining the plan quality.Methods: First-order total-variation (TV) minimization (min.) based on L1-norm has been proposed to reduce the complexity of fluence-map in IMRT by generating sparse fluence-map variations. However, with stronger dose sparing to the critical structures, the inevitable increase in the fluence-map complexity can lead to inefficient dose delivery. Theoretically, L0-min. is the ideal solution for the sparse signal recovery problem, yet practically intractable due to its nonconvexity of the objective function. As an alternative, the authors use the iteratively reweighted L1-min. technique to incorporate the benefits of the L0-norm into the tractability of L1-min. The weight multiplied to each element is inversely related to the magnitude of the corresponding element, which is iteratively updated by the reweighting process. The proposed penalizing process combined with TV min. further improves sparsity in the fluence-map variations, hence ultimately enhancing the delivery efficiency. To validate the proposed method, this work compares three treatment plans obtained from quadratic min. (generally used in clinic IMRT), conventional TV min., and our proposed reweighted TV min. techniques, implemented by a large-scale L1-solver (template for first-order conic solver), for five patient clinical data. Criteria such as conformation number (CN), modulation index (MI), and estimated treatment time are employed to assess the relationship between the plan quality and delivery efficiency.Results: The proposed method yields simpler fluence-maps than the quadratic and conventional TV based techniques. To attain a given CN and dose sparing to the critical organs for 5 clinical cases, the proposed method reduces the number of segments

  9. Improving IMRT delivery efficiency with reweighted L1-minimization for inverse planning

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hojin [Department of Radiation Oncology, Stanford University, Stanford, California 94305-5847 and Department of Electrical Engineering, Stanford University, Stanford, California 94305-9505 (United States); Becker, Stephen [Laboratoire Jacques-Louis Lions, Universite Pierre et Marie Curie, Paris 6, 75005 France (France); Lee, Rena; Lee, Soonhyouk [Department of Radiation Oncology, School of Medicine, Ewha Womans University, Seoul 158-710 (Korea, Republic of); Shin, Sukyoung [Medtronic CV RDN R and D, Santa Rosa, California 95403 (United States); Candes, Emmanuel [Department of Statistics, Stanford University, Stanford, California 94305-4065 (United States); Xing Lei; Li Ruijiang [Department of Radiation Oncology, Stanford University, Stanford, California 94305-5304 (United States)

    2013-07-15

    Purpose: This study presents an improved technique to further simplify the fluence-map in intensity modulated radiation therapy (IMRT) inverse planning, thereby reducing plan complexity and improving delivery efficiency, while maintaining the plan quality.Methods: First-order total-variation (TV) minimization (min.) based on L1-norm has been proposed to reduce the complexity of fluence-map in IMRT by generating sparse fluence-map variations. However, with stronger dose sparing to the critical structures, the inevitable increase in the fluence-map complexity can lead to inefficient dose delivery. Theoretically, L0-min. is the ideal solution for the sparse signal recovery problem, yet practically intractable due to its nonconvexity of the objective function. As an alternative, the authors use the iteratively reweighted L1-min. technique to incorporate the benefits of the L0-norm into the tractability of L1-min. The weight multiplied to each element is inversely related to the magnitude of the corresponding element, which is iteratively updated by the reweighting process. The proposed penalizing process combined with TV min. further improves sparsity in the fluence-map variations, hence ultimately enhancing the delivery efficiency. To validate the proposed method, this work compares three treatment plans obtained from quadratic min. (generally used in clinic IMRT), conventional TV min., and our proposed reweighted TV min. techniques, implemented by a large-scale L1-solver (template for first-order conic solver), for five patient clinical data. Criteria such as conformation number (CN), modulation index (MI), and estimated treatment time are employed to assess the relationship between the plan quality and delivery efficiency.Results: The proposed method yields simpler fluence-maps than the quadratic and conventional TV based techniques. To attain a given CN and dose sparing to the critical organs for 5 clinical cases, the proposed method reduces the number of segments

  10. Building a Green Metropolis. Costs and impacts. Plan of the Dutch environmental organization Milieudefensie; Bouwen aan een Groene Metropool. Kosten en effecten. Plan van Milieudefensie

    Energy Technology Data Exchange (ETDEWEB)

    Doenszelmann, C.E.P.; Schroten, A.

    2011-05-15

    The plan of the Dutch environmental organization Milieudefensie contains various proposals for a more sustainable realization of accessibility in the Rotterdam region. CE Delft mapped the costs and environmental effects of these proposals. [Dutch] In het plan van Milieudefensie worden verschillende voorstellen gedaan om tot een duurzamere invulling van de bereikbaarheid in de Rotterdamse regio te komen. CE Delft heeft de kosten en de milieueffecten van deze voorstellen in beeld gebracht.

  11. AB Manpower Plan 2007

    CERN Document Server

    Myers, Stephen

    2007-01-01

    The present exercise is not as such a "manpower plan" but a purely budgetary comparison of known plus requested resources with the known commitments over the period 2007-2012. From a purely budgetary point of view, AB will have the capacity to maintain all those recently hired staff who fulfill the criteria for long term employment at CERN. Following this budgetary exercise, AB proposes to perform a CERN-wide staff work plan so as to compare the manpower available to the quantity of work to be done in the totality of the work-packages. If there is a significant mismatch between these two quantities then we propose the following measures which would create personnel economies and allow us to redress the mismatch by increased recruitment: a new job severance scheme; CERN restructuring; use of the new CERN-ITER agreement; more flexibility in transfers from Materials to Personnel budgets. Failing this a re-examination of possible closure of lower priority facilities may be needed.

  12. Proposal for a modification of SPICA

    International Nuclear Information System (INIS)

    Bobeldijk, C.; Goedbloed, J.P.; Griffioen, A.C.; D'Ippolito, D.A.

    1978-10-01

    Results and conclusions of recent experimental and theoretical screw-pinch research at Jutphaas are summarized. Based on these conclusions a modification of the toroidal vacuum chamber and the conducting shell of SPICA is proposed. The physics objectives of the modified experiment (SPICA II) as well as the planning are described. More detailed information can be obtained from the appendices. (Auth.)

  13. Demand planning ve společnosti Farm Frites

    OpenAIRE

    Rosíková, Eva

    2009-01-01

    Theoretic part of thesis included short introduction into logistics, define question of demand planning and his role in SCM. In practical part is outlined function of SCM in Farm Frites company. Description of logistics chain, which is necessary part for understanding of whole proces of demand planning in company. Main object of thesis is to determine problems connected with demand planning and proposal of resolution of that problems in Farm Frites.

  14. 30 Energy Cities' proposals for the energy transition of cities and towns

    International Nuclear Information System (INIS)

    2014-01-01

    In 2012, Energy Cities initiated a collective process aimed at making proposals to accelerate the energy transition of European territories. The 30 Proposals presented in this document are the result of part of this collective work. Other proposals are available on the Internet. These Proposals are based on the observation and analysis of hundreds of practical examples, all stemming from existing practices. Our intention is to make these practices 'talk', to convey their meaning and to show the path they are pointing at, sometimes without us being aware of it. The criterion for selecting these Proposals is straightforward and concerns their transforming capacity, that is, their ability to change the way we think and act. Specific attention has therefore been given to all aspects of innovation, including territorial governance. These Proposals aim to 'recreate society' through a subject which concerns us all, energy, and beyond this, to open avenues to the transition towards a more humane economy, more attuned to the challenges of the century. Proposals: 1 - Empowering local players: Take local control of energy supply; Unite all stakeholders in a local energy alliance; Ensure public budgets integrate positive and negative energy externalities; Co-create a long-term vision to shape all policies; Eradicate local fuel poverty; Lead by example by transforming municipal energy management; Prepare an Energy Transition Action Plan; Be part of regional, national and European networks to gain exposure to others' experience; 2 - Knowing our territories' resources and flows: Know the territory's metabolism so as to optimise local potential and reduce the impact of human activities on the ecosystem; Identify local energy potential in order to live within our means; Prepare a local heat plan to match need and available resource; Create and implement a territorial bio-waste action plan; Make the best use of energy and material flows by encouraging synergies between players; Make

  15. Study on role structure in social planning systems

    International Nuclear Information System (INIS)

    Kimata, Noboru

    1984-01-01

    New proposals are attended with a new set of role-expectation. If we lack attention to this aspect of any proposal, we face a serious difficulty in its implementation stage. The system called as Public Hearring shows us this fact. In this paper, introducing ABC model of communication by Westley and Maclean, we try to describe a set of role-expectation for particitants in social planning systems. And also introducing analytical concepts of role enactment process, we reveal two important problems for any proposal as a subsystem of social planning systems: (i) importance of role negotiation process for role-consensus, and (ii) necessity of supporting systems for role-adaptation. Especially for role-adaptation to Channel-Roles, we indicate the potential of VISMS as its supporting system. (author)

  16. Proposed Plan for the R-Area Bingham Pump Outage Pits (643-8G, -9G, -10G) and R-Area Unknown Pits No.1, No.2, No.3 (RUNK-1, -2, -3); FINAL

    International Nuclear Information System (INIS)

    Mundy, S.

    2002-01-01

    The purpose of this proposed plan is to describe the preferred remedial alternative for the R-Area Bingham Pump Outage Pits (R BPOPs) and the R-Area Unknowns (RUNKs) operable unit (OU) and to provide for public involvement in the decision-making process

  17. Winning the Invisible War: An Agricultural Pilot Plan for Afghanistan

    National Research Council Canada - National Science Library

    Borcherdt, Edward; Carson, Austin; Kennefick, Frank; Moseley, James; Taylor, William; Ullman, Harlan; Wentz, Larry

    2008-01-01

    .... The third was to propose specific pilot plans for rejuvenating the agricultural sector. These plans were developed by experienced American farmers and other experts with long careers in government, agriculture, and development...

  18. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  19. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  20. A bat algorithm with mutation for UCAV path planning.

    Science.gov (United States)

    Wang, Gaige; Guo, Lihong; Duan, Hong; Liu, Luo; Wang, Heqi

    2012-01-01

    Path planning for uninhabited combat air vehicle (UCAV) is a complicated high dimension optimization problem, which mainly centralizes on optimizing the flight route considering the different kinds of constrains under complicated battle field environments. Original bat algorithm (BA) is used to solve the UCAV path planning problem. Furthermore, a new bat algorithm with mutation (BAM) is proposed to solve the UCAV path planning problem, and a modification is applied to mutate between bats during the process of the new solutions updating. Then, the UCAV can find the safe path by connecting the chosen nodes of the coordinates while avoiding the threat areas and costing minimum fuel. This new approach can accelerate the global convergence speed while preserving the strong robustness of the basic BA. The realization procedure for original BA and this improved metaheuristic approach BAM is also presented. To prove the performance of this proposed metaheuristic method, BAM is compared with BA and other population-based optimization methods, such as ACO, BBO, DE, ES, GA, PBIL, PSO, and SGA. The experiment shows that the proposed approach is more effective and feasible in UCAV path planning than the other models.

  1. Lead time anticipation in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Fransoo, J.C.

    2013-01-01

    Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process

  2. 13 CFR 108.2005 - Contents of plan submitted by SSBICs.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contents of plan submitted by... Operational Assistance. The SSBIC must describe how it plans to use its grant funds to provide Operational... types of Operational Assistance it proposes to provide, and how it plans to provide the Operational...

  3. International nuclear legislation: proposals of the Russian Federation

    International Nuclear Information System (INIS)

    Anon.

    2011-01-01

    Proposals of the Russian Federation on the amendments to Convention on early notification of a nuclear accident and to Convention on nuclear safety, as well as proposals on enhancement of IAEA safety standards are given. It is suggested to fix a provision regarding prompt and limited in time notification of the concerned State Parties of the Convention and the IAEA by a State where an accident has occurred; as well as a provision that would require making relevant information public. It is proposed to provide for the following commitment of Contracting Parties to the Convention: a Contracting Party planning to start construction of a first nuclear installation under its jurisdiction shall take, prior to commencement of the construction, all necessary steps related to long-term planning and establishment of nuclear power infrastructure, in line with the IAEA recommendations. It is pointed out the necessity of a clear procedure of coordination and interaction between a State, concerned operator and regulator. It is necessary to revise the existing design requirements with a view to consider any combination of external impacts on a nuclear installation, as well as to include adequate provisions for nuclear safety in case of such impacts

  4. On e-business strategy planning and performance evaluation: An adaptive algorithmic managerial approach

    Directory of Open Access Journals (Sweden)

    Alexandra Lipitakis

    2017-07-01

    Full Text Available A new e-business strategy planning and performance evaluation scheme based on adaptive algorithmic modelling techniques is presented. The effect of financial and non-financial performance of organizations on e-business strategy planning is investigated. The relationships between the four strategic planning parameters are examined, the directions of these relationships are given and six additional basic components are also considered. The new conceptual model has been constructed for e-business strategic planning and performance evaluation and an adaptive algorithmic modelling approach is presented. The new adaptive algorithmic modelling scheme including eleven dynamic modules, can be optimized and used effectively in e-business strategic planning and strategic planning evaluation of various e-services in very large organizations and businesses. A synoptic statistical analysis and comparative numerical results for the case of UK and Greece are given. The proposed e-business models indicate how e-business strategic planning may affect financial and non-financial performance in business and organizations by exploring whether models which are used for strategy planning can be applied to e-business planning and whether these models would be valid in different environments. A conceptual model has been constructed and qualitative research methods have been used for testing a predetermined number of considered hypotheses. The proposed models have been tested in the UK and Greece and the conclusions including numerical results and statistical analyses indicated existing relationships between considered dependent and independent variables. The proposed e-business models are expected to contribute to e-business strategy planning of businesses and organizations and managers should consider applying these models to their e-business strategy planning to improve their companies’ performances. This research study brings together elements of e

  5. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  6. Robust path planning for flexible needle insertion using Markov decision processes.

    Science.gov (United States)

    Tan, Xiaoyu; Yu, Pengqian; Lim, Kah-Bin; Chui, Chee-Kong

    2018-05-11

    Flexible needle has the potential to accurately navigate to a treatment region in the least invasive manner. We propose a new planning method using Markov decision processes (MDPs) for flexible needle navigation that can perform robust path planning and steering under the circumstance of complex tissue-needle interactions. This method enhances the robustness of flexible needle steering from three different perspectives. First, the method considers the problem caused by soft tissue deformation. The method then resolves the common needle penetration failure caused by patterns of targets, while the last solution addresses the uncertainty issues in flexible needle motion due to complex and unpredictable tissue-needle interaction. Computer simulation and phantom experimental results show that the proposed method can perform robust planning and generate a secure control policy for flexible needle steering. Compared with a traditional method using MDPs, the proposed method achieves higher accuracy and probability of success in avoiding obstacles under complicated and uncertain tissue-needle interactions. Future work will involve experiment with biological tissue in vivo. The proposed robust path planning method can securely steer flexible needle within soft phantom tissues and achieve high adaptability in computer simulation.

  7. Path Planning Method for UUV Homing and Docking in Movement Disorders Environment

    Directory of Open Access Journals (Sweden)

    Zheping Yan

    2014-01-01

    Full Text Available Path planning method for unmanned underwater vehicles (UUV homing and docking in movement disorders environment is proposed in this paper. Firstly, cost function is proposed for path planning. Then, a novel particle swarm optimization (NPSO is proposed and applied to find the waypoint with minimum value of cost function. Then, a strategy for UUV enters into the mother vessel with a fixed angle being proposed. Finally, the test function is introduced to analyze the performance of NPSO and compare with basic particle swarm optimization (BPSO, inertia weight particle swarm optimization (LWPSO, EPSO, and time-varying acceleration coefficient (TVAC. It has turned out that, for unimodal functions, NPSO performed better searching accuracy and stability than other algorithms, and, for multimodal functions, the performance of NPSO is similar to TVAC. Then, the simulation of UUV path planning is presented, and it showed that, with the strategy proposed in this paper, UUV can dodge obstacles and threats, and search for the efficiency path.

  8. National Energy Plan 2030: a proposal for power generation expansion in the long term; Plano Nacional de Energia 2030: uma proposta de expansao para a geracao de energia eletrica no longo prazo

    Energy Technology Data Exchange (ETDEWEB)

    Guerreiro, Amilcar Goncalves; Pereira Junior, Amaro Olimpio; Lopes, Juarez Castrillon; Tavares, Marina Elisabete E.; Silva, Renata de A.M. da; Queiroz, Renato P.; Oliveira, Ricardo G. de [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil)

    2008-07-01

    The article aims to present and discuss a proposal for electric energy expansion generation capacity in long term. This work identifies the most appropriate evolution of the hydrothermal mix for the expansion of the supply of electrical power in the country, over the horizon of planning by 2030. (author)

  9. Tunnel boring waste test plan

    International Nuclear Information System (INIS)

    Patricio, J.G.

    1984-03-01

    The test plan has been prepared in anticipation of the need to excavate certain repository openings by relying upon mechanical excavation techniques. The test plan proposes that specific technical issues can be resolved and key design parameters defined by excavating openings in basalt near the surface, utilizing a full face tunnel boring machine (TBM). The purpose and objective of this type of testing will define the overall feasibility and attributes of mechanical excavation in basalt. The test plan recognizes that although this technology is generally available for underground construction for some geologic settings, the current state of technology for excavation in basalt is limited and the potential for improvement is considerable. The test plan recommends that it is economically advantageous to conduct additional testing in the laboratory to allow refinement of this plan based on the laboratory results. Thus, this test plan is considered preliminary in nature, with respect to detailed testing recommendations. However, the gross design attributes and resource requirements of a near-surface TBM demonstration are considered to be valid. 15 refs., 7 figs., 3 tabs

  10. Sostenibilidad, plan de desarrollo y política petrolera Sustainability, Development Plan and oil policy

    Directory of Open Access Journals (Sweden)

    Álvarez H. Carlos G.

    1999-06-01

    Full Text Available Este ensayo examina la politica petrolera y de recursos naturales del Plan de Desarrollo. Muestra, en particular, que las declaraciones de 'sostenibilidad' son inconsistentes con las politicas que se adelantan y que se trata de una propuesta de incrementos desaforados de la produccion petrolera bajo la mirada de la economia estandar. El 'desarrollo sostenible' resulta siendo tarea de las generaciones futuras, desconociendo el mandato constitucional. Tambien discute la propuesta de reforma a la ley de regalias implicita en el articulo 60 del proyecto de ley de plan de desarrollo y muestra que se emplean indicadores de competitividad manipulados para subestimar la competitividad colombiana. De acuerdo con el analisis efectuado por el Ministerio de Minas no parece razonable aprobar esa reforma si se trata de mejorar la competitividad financiera. En suma, la actual politica petrolera no introduce elementos de democracia y sostenibilidad.This essay examines the oil and natural resource policies of the Development Plan. In particular, it shows that its declarations of 'sustainability' are inconsistent with the policies it puts forward and that it is really a proposal for boundless increases in oil production under the gaze of the standard economy. 'Sustainable development' turns out to be the task of future generations, ignoring the constitutional mandate.
    It also discusses the proposal for reform of the law on payments for oil and mineral exploitation implicit in Article 60 of the Plan's law proposal and shows that the competitiveness indicators it uses are manipulated to underestimate Colombian competi tiveness. In accordance with the analysis carried out by the Ministry of Mines, it does not appear reasonable to approve this reform if the purpose is to improve financial competitiveness. In sum, the current oil policy does not introduce elements of democracy or of sustainability.

  11. A new intrusion prevention model using planning knowledge graph

    Science.gov (United States)

    Cai, Zengyu; Feng, Yuan; Liu, Shuru; Gan, Yong

    2013-03-01

    Intelligent plan is a very important research in artificial intelligence, which has applied in network security. This paper proposes a new intrusion prevention model base on planning knowledge graph and discuses the system architecture and characteristics of this model. The Intrusion Prevention based on plan knowledge graph is completed by plan recognition based on planning knowledge graph, and the Intrusion response strategies and actions are completed by the hierarchical task network (HTN) planner in this paper. Intrusion prevention system has the advantages of intelligent planning, which has the advantage of the knowledge-sharing, the response focused, learning autonomy and protective ability.

  12. The SRS analytical laboratories strategic plan

    International Nuclear Information System (INIS)

    Hiland, D.E.

    1993-01-01

    There is an acute shortage of Savannah River Site (SRS) analytical laboratory capacity to support key Department of Energy (DOE) environmental restoration and waste management (EM) programs while making the transition from traditional defense program (DP) missions as a result of the cessation of the Cold War. This motivated Westinghouse Savannah River Company (WSRC) to develop an open-quotes Analytical Laboratories Strategic Planclose quotes (ALSP) in order to provide appropriate input to SRS operating plans and justification for proposed analytical laboratory projects. The methodology used to develop this plan is applicable to all types of strategic planning

  13. Nuclear Waste Policy Act transportation planning

    International Nuclear Information System (INIS)

    Klein, K.A.

    1984-01-01

    The importance and magnitude of effort to put in place a safe, publicly acceptable transportation system for radioactive wastes are discussed. The importance of working openly, documenting efforts in a way that is objective and can be understood by the general public, and being particularly sensitive and responsive to public concerns is recognized. Key elements of current planning have been described, but numerous details remain to be worked out. These details will be worked out, proposed in programs plans, and made publicly available. The author looks forward to ideas and comments for improving these plans and their implementation

  14. [The Amazon Sanitation Plan (1940-1942)].

    Science.gov (United States)

    Andrade, Rômulo de Paula; Hochman, Gilberto

    2007-12-01

    The article addresses the Amazon Sanitation Plan and the political context in which it was formulated between 1940 and 1941. It examines the role of Getúlio Vargas, the activities of the plan's main protagonists (such as Evandro Chagas, João de Barros Barreto, and Valério Konder), its key proposals, and its demise as of 1942 upon creation of the Special Public Health Service (Sesp), which grew out of cooperation agreements between Brazil and the US following both nations' involvement in World War II. A reproduction of the Plan as published in the Arquivos de Higiene in 1941 is included.

  15. White plan and crisis management. Help guide for the elaboration of extended white plans and of white plans for health establishments. Issue 2006, appendix to circular nr DHOS/CGR/2006/401 of 2006 September 14

    International Nuclear Information System (INIS)

    2006-01-01

    White plans are specific emergency plans to be implemented in public and private health establishments. While introducing necessary modifications and taking public health policy effects into account, this document first defines crises and their management (levels of intervention from the local to the national level, typology of emergency plans, emergency medical chain, extended white plans). The second part proposes a set of sheets which aim to be a support in the elaboration of the extended white plan and of the white plan. The third part, based on professional contributions and lessons learned, addresses two important issues: firstly, the crisis management exercise, and secondly the hospital under tension and white plan triggering thresholds

  16. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy

    International Nuclear Information System (INIS)

    Song, Ting; Zhou, Linghong; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Jiang, Steve B; Gu, Xuejun

    2015-01-01

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient’s unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient’s geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control. (paper)

  17. 78 FR 10104 - Watermelon Research and Promotion Plan; Importer Membership Requirements

    Science.gov (United States)

    2013-02-13

    ..., advertising, and promotion designed to strengthen the watermelon's position in the market place and to... Service 7 CFR Part 1210 [Document Number AMS-FV-11-0031] Watermelon Research and Promotion Plan; Importer... rule proposes to amend the Watermelon Research and Promotion Plan (Plan) importer membership...

  18. Marketing Plan of SK Dynamo České Budějovice

    OpenAIRE

    Kramář, Jan

    2012-01-01

    The major goal of this bachelor work is a detailed marketing situational analysis of a current club marketing plan. The marketing plan will be proposed on basis of detailed marketing situational analysis. The club may use the marketing plan as a source for written processing.

  19. 25 CFR 87.9 - Programming aspects of plans.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  20. 78 FR 67342 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2013-11-12

    ... proposed Retired and Senior Volunteer Program Survey. The survey will be administered to a sample of current RSVP volunteers to assess the distribution of volunteers across work plans, volunteer time... volunteers by work areas to assess volunteer activity with regard to performance measurement requirements...

  1. The planning system and its impact on sustainable urban form and energy demand

    NARCIS (Netherlands)

    Wolsink, M.; Attali, S.; Métreau, E.; Prône, M.; Tillerson, K.

    2003-01-01

    The Dutch physical planning system is at a turning point. Recently the Government proposed a new institutional framework for spatial planning. Theoretically, existing planning hierarchy suggests that planning in the Netherlands is conducted systematically, including a strong notion of integrated

  2. A Method for Automated Planning of FTTH Access Network Infrastructures

    DEFF Research Database (Denmark)

    Riaz, Muhammad Tahir; Pedersen, Jens Myrup; Madsen, Ole Brun

    2005-01-01

    In this paper a method for automated planning of Fiber to the Home (FTTH) access networks is proposed. We introduced a systematic approach for planning access network infrastructure. The GIS data and a set of algorithms were employed to make the planning process more automatic. The method explains...... method. The method, however, does not fully automate the planning but make the planning process significantly fast. The results and discussion are presented and conclusion is given in the end....

  3. Merchandise and Replenishment Planning Optimisation for Fashion Retail

    Directory of Open Access Journals (Sweden)

    Raffaele Iannone

    2013-08-01

    Full Text Available The integration among different companies functions, collaborative planning and the elaboration of focused distribution plans are critical to the success of each kind of company working in the complex retail sector. In this contest, the present work proposes the description of a model able to support coordinated strategic choices continually made by Supply Chain (SC actors. The final objective is achievement of the full optimisation of Merchandise & Replenishment Planning phases, identifying the right replenishment quantities and periods. To test the proposed model’s effectiveness, it was applied to an important Italian fashion company in the complex field of fast-fashion, a sector in which promptness is a main competitive leverage and, therefore, the planning cannot exclude the time variable. The passage from a total push strategy, currently used by the company, to a push-pull one, suggested by the model, allowed us not only to estimate a reduction in goods quantities to purchase at the beginning of a sales period (with considerable economic savings, but also elaborate a focused replenishment plan that permits reduction and optimisation of departures from network warehouses to Points of Sale (POS.

  4. Human-like motion planning model for driving in signalized intersections

    Directory of Open Access Journals (Sweden)

    Yanlei Gu

    2017-10-01

    Full Text Available Highly automated and fully autonomous vehicles are much more likely to be accepted if they react in the same way as human drivers do, especially in a hybrid traffic situation, which allows autonomous vehicles and human-driven vehicles to share the same road. This paper proposes a human-like motion planning model to represent how human drivers assess environments and operate vehicles in signalized intersections. The developed model consists of a pedestrian intention detection model, gap detection model, and vehicle control model. These three submodels are individually responsible for situation assessment, decision making, and action, and also depend on each other in the process of motion planning. In addition, these submodels are constructed and learned on the basis of human drivers' data collected from real traffic environments. To verify the effectiveness of the proposed motion planning model, we compared the proposed model with actual human driver and pedestrian data. The experimental results showed that our proposed model and actual human driver behaviors are highly similar with respect to gap acceptance in intersections.

  5. 76 FR 76439 - Proposed Extension of Information Collection Requests Submitted for Public Comment: Disclosures...

    Science.gov (United States)

    2011-12-07

    ... requires administrators of pension and welfare benefit plans (collectively, employee benefit plans), and... DEPARTMENT OF LABOR Employee Benefits Security Administration Proposed Extension of Information... Correction Program and Class Exemption AGENCY: Employee Benefits Security Administration, Department of Labor...

  6. An algorithmic interactive planning framework in support of sustainable technologies

    Science.gov (United States)

    Prica, Marija D.

    This thesis addresses the difficult problem of generation expansion planning that employs the most effective technologies in today's changing electric energy industry. The electrical energy industry, in both the industrialized world and in developing countries, is experiencing transformation in a number of different ways. This transformation is driven by major technological breakthroughs (such as the influx of unconventional smaller-scale resources), by industry restructuring, changing environmental objectives, and the ultimate threat of resource scarcity. This thesis proposes a possible planning framework in support of sustainable technologies where sustainability is viewed as a mix of multiple attributes ranging from reliability and environmental impact to short- and long-term efficiency. The idea of centralized peak-load pricing, which accounts for the tradeoffs between cumulative operational effects and the cost of new investments, is the key concept in support of long-term planning in the changing industry. To start with, an interactive planning framework for generation expansion is posed as a distributed decision-making model. In order to reconcile the distributed sub-objectives of different decision makers with system-wide sustainability objectives, a new concept of distributed interactive peak load pricing is proposed. To be able to make the right decisions, the decision makers must have sufficient information about the estimated long-term electricity prices. The sub-objectives of power plant owners and load-serving entities are profit maximization. Optimized long-term expansion plans based on predicted electricity prices are communicated to the system-wide planning authority as long-run bids. The long-term expansion bids are cleared by the coordinating planner so that the system-wide long-term performance criteria are satisfied. The interactions between generation owners and the coordinating planning authority are repeated annually. We view the proposed

  7. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  8. When does treatment plan optimization require inverse planning?

    International Nuclear Information System (INIS)

    Sherouse, George W.

    1995-01-01

    Increasing maturity of image-based computer-aided design of three-dimensional conformal radiotherapy has recently sparked a great deal of work in the area of treatment plan optimization. Optimization of a conformal photon beam treatment plan is that exercise through which a set of intensity-modulated static beams or arcs is specified such that, when the plan is executed, 1) a region of homogeneous dose is produced in the patient with a shape which geometrically conforms (within a specified tolerance) to the three-dimensional shape of a designated target volume and 2) acceptably low incidental dose is delivered to non-target tissues. Interest in conformal radiotherapy arise from a fundamental assumption that there is significant value to be gained from aggressive customization of the treatment for each individual patient In our efforts to design optimal treatments, however, it is important to remember that, given the biological and economic realities of clinical radiotherapy, mathematical optimization of dose distribution metrics with respect to some minimal constraint set is not a necessary or even sufficient condition for design of a clinically optimal treatment. There is wide variation in the complexity of the clinical situations encountered in practice and there are a number of non-physical criteria to be considered in planning. There is also a complementary variety of computational and engineering means for achieving optimization. To date, the scientific dialogue regarding these techniques has concentrated on development of solutions to worst-case scenarios, largely in the absence of consideration of appropriate matching of solution complexity to problem complexity. It is the aim of this presentation to propose a provisional stratification of treatment planning problems, stratified by relative complexity, and to identify a corresponding stratification of necessary treatment planning techniques. It is asserted that the subset of clinical radiotherapy cases for

  9. Resource Constrained Planning of Multiple Projects with Separable Activities

    Science.gov (United States)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  10. An Approach for Practical Multiobjective IMRT Treatment Planning

    International Nuclear Information System (INIS)

    Craft, David; Halabi, Tarek; Shih, Helen A.; Bortfeld, Thomas

    2007-01-01

    Purpose: To introduce and demonstrate a practical multiobjective treatment planning procedure for intensity-modulated radiation therapy (IMRT) planning. Methods and Materials: The creation of a database of Pareto optimal treatment plans proceeds in two steps. The first step solves an optimization problem that finds a single treatment plan which is close to a set of clinical aspirations. This plan provides an example of what is feasible, and is then used to determine mutually satisfiable hard constraints for the subsequent generation of the plan database. All optimizations are done using linear programming. Results: The two-step procedure is applied to a brain, a prostate, and a lung case. The plan databases created allow for the selection of a final treatment plan based on the observed tradeoffs between the various organs involved. Conclusions: The proposed method reduces the human iteration time common in IMRT treatment planning. Additionally, the database of plans, when properly viewed, allows the decision maker to make an informed final plan selection

  11. Expansion planning of brazilian electric sector: institutional changes, new policies and new instruments for planning

    International Nuclear Information System (INIS)

    Bajay, S.V.; Silva, W.A. da; Ricciulli, D.L.S.

    1990-01-01

    The Brazilian power supply industry has been in crisis for many years, particularly due to financial and institutional problems. There are many reasons for that, several of them from outside the industry. In this paper a diagnosis of the main elements of this crisis is worked out, in the context of the industry's expansion planning. Following, institutional changes, new policies and new instruments are proposed for this planning. The institutional setting, the demand studies, the demand side management, the supply optimisation, the rural electrification, the decentralized generation of electricity, the tariff structure, the ways of financing the industry, the technological advances, the social and environmental impacts and the integrated planning of the industry are discussed, together with the planning of the power supply industry interactions with the other energy supply industries and the rest of the economy. (author)

  12. Strategic Team AI Path Plans: Probabilistic Pathfinding

    Directory of Open Access Journals (Sweden)

    Tng C. H. John

    2008-01-01

    Full Text Available This paper proposes a novel method to generate strategic team AI pathfinding plans for computer games and simulations using probabilistic pathfinding. This method is inspired by genetic algorithms (Russell and Norvig, 2002, in that, a fitness function is used to test the quality of the path plans. The method generates high-quality path plans by eliminating the low-quality ones. The path plans are generated by probabilistic pathfinding, and the elimination is done by a fitness test of the path plans. This path plan generation method has the ability to generate variation or different high-quality paths, which is desired for games to increase replay values. This work is an extension of our earlier work on team AI: probabilistic pathfinding (John et al., 2006. We explore ways to combine probabilistic pathfinding and genetic algorithm to create a new method to generate strategic team AI pathfinding plans.

  13. An Overview on Infrastructure of Digital Prescription and a Proposed Strategic Plan

    Directory of Open Access Journals (Sweden)

    Mohammad Keshavarz

    2015-04-01

    Full Text Available One of the most common and important therapeutic tools used by physicians is prescription. The use of digital systems in the health field has many benefits and significant impacts on the health system. One of these systems is digital prescription. In this article, First, we will review the existing infrastructure and work done in this area, and then with a new perspective on health issues, we will provide a new infrastructure. Instead of introduction and use of a product or a system or statistical work , we aim to reviewe fundamental issues in the field of health system and present a strategic plan in the field of medicine from the perspective of experts of medical informatics and IT specialists. In fact, we will present a strategic plan and will provide infrastructure in the health field The infrastructure needed to create a digital system will be provided in order to increase productivity in various aspects of the health system; also, the interactions between different parts of this infrastructure will be discussed. The advantages of this project will be reviewed from the perspective of various elements involved in the health system; these include patients, doctors, health system managers, pharmacies, pharmaceutical distribution companies, insurance office and other organizations, such as the environmental organizations, tax office, etc. and benefits of each one will be reviewed

  14. Path Planning Algorithms for Autonomous Border Patrol Vehicles

    Science.gov (United States)

    Lau, George Tin Lam

    This thesis presents an online path planning algorithm developed for unmanned vehicles in charge of autonomous border patrol. In this Pursuit-Evasion game, the unmanned vehicle is required to capture multiple trespassers on its own before any of them reach a target safe house where they are safe from capture. The problem formulation is based on Isaacs' Target Guarding problem, but extended to the case of multiple evaders. The proposed path planning method is based on Rapidly-exploring random trees (RRT) and is capable of producing trajectories within several seconds to capture 2 or 3 evaders. Simulations are carried out to demonstrate that the resulting trajectories approach the optimal solution produced by a nonlinear programming-based numerical optimal control solver. Experiments are also conducted on unmanned ground vehicles to show the feasibility of implementing the proposed online path planning algorithm on physical applications.

  15. 78 FR 17632 - Caribou-Targhee National Forest; Idaho and Wyoming; Amendment to the Targhee Revised Forest Plan...

    Science.gov (United States)

    2013-03-22

    ...; Amendment to the Targhee Revised Forest Plan--Canada Lynx Habitat AGENCY: Forest Service, USDA. ACTION... Forest proposes to amend the Targhee Revised Forest Plan (1997) to include a map identifying specific... Administrative Review Process: The decision on this proposed plan amendment will be subject to the objection...

  16. 75 FR 64389 - Proposed Recommendation to the Social Security Administration for Occupational Information System...

    Science.gov (United States)

    2010-10-19

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2010-0066] Proposed Recommendation to the Social Security Administration for Occupational Information System (OIS) Development Planning; Request for Comment...) to provide independent advice and recommendations on plans and activities to create an occupational...

  17. The Circumpolar Biodiversity Monitoring Program Terrestrial Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    , understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity, and to identify knowledge gaps and priorities. This poster will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based monitoring...... and coastal environments. The CBMP Terrestrial Plan is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect...

  18. Conservation and energy efficiency plan 2006

    International Nuclear Information System (INIS)

    2005-11-01

    This plan outlined details of Nova Scotia's proposed $5 million incremental investment in energy efficiency and conservation measures in 2006. The plan was developed through consultation with various Canadian utilities, customers and external stakeholders. A team of stakeholders identified lighting, pricing, partnerships and education as opportunities offering the greatest potential for results. Market research was conducted to identify market potential and the identification of barriers to customer adoption of programs as well as customer expectations regarding program implementation. It was anticipated that the plan will reduce electricity usage and result in significant savings for customers, as well as reducing greenhouse gas (GHG) emissions. The aim of the plan is to help build a conservation and energy efficiency culture in Nova Scotia and to bring Nova Scotia Power together with community-based partners. Specific plans for 2007 included: a 72 GWh reduction in annual electricity usage; approximately $7.7 million in annual savings to customers; a 16 MW reduction in peak electricity demand; and a 50 thousand tonne reduction of GHGs. A business case was presented along with details of proposed residential, commercial and industrial programs. A cost benefit analysis was provided, as well as an outline of the plan's budget and organizational structure. It was concluded that the success of the various program elements will be based on quantitative and qualitative data on the actual effect on energy use of each customer sector, as well as its effect on system demand profiles. Data will be collected through the use of customer surveys, questionnaires, and direct feedback from partners, educators and manufactures and suppliers. 11 tabs., 16 figs

  19. 75 FR 60482 - Proposed Extension of Information Collection Request Submitted for Public Comment; Affordable...

    Science.gov (United States)

    2010-09-30

    ... or beneficiaries describing the benefits provided under the plan or health insurance coverage, that... benefits under the plan or health insurance coverage, or in the individual market, provides a primary... DEPARTMENT OF LABOR Employee Benefits Security Administration Proposed Extension of Information...

  20. Decentralized flight trajectory planning of multiple aircraft

    OpenAIRE

    Yokoyama, Nobuhiro; 横山 信宏

    2008-01-01

    Conventional decentralized algorithms for optimal trajectory planning tend to require prohibitive computational time as the number of aircraft increases. To overcome this drawback, this paper proposes a novel decentralized trajectory planning algorithm adopting a constraints decoupling approach for parallel optimization. The constraints decoupling approach is formulated as the path constraints of the real-time trajectory optimization problem based on nonlinear programming. Due to the parallel...

  1. A new plan-scoring method using normal tissue complication probability for personalized treatment plan decisions in prostate cancer

    Science.gov (United States)

    Kim, Kwang Hyeon; Lee, Suk; Shim, Jang Bo; Yang, Dae Sik; Yoon, Won Sup; Park, Young Je; Kim, Chul Yong; Cao, Yuan Jie; Chang, Kyung Hwan

    2018-01-01

    The aim of this study was to derive a new plan-scoring index using normal tissue complication probabilities to verify different plans in the selection of personalized treatment. Plans for 12 patients treated with tomotherapy were used to compare scoring for ranking. Dosimetric and biological indexes were analyzed for the plans for a clearly distinguishable group ( n = 7) and a similar group ( n = 12), using treatment plan verification software that we developed. The quality factor ( QF) of our support software for treatment decisions was consistent with the final treatment plan for the clearly distinguishable group (average QF = 1.202, 100% match rate, n = 7) and the similar group (average QF = 1.058, 33% match rate, n = 12). Therefore, we propose a normal tissue complication probability (NTCP) based on the plan scoring index for verification of different plans for personalized treatment-plan selection. Scoring using the new QF showed a 100% match rate (average NTCP QF = 1.0420). The NTCP-based new QF scoring method was adequate for obtaining biological verification quality and organ risk saving using the treatment-planning decision-support software we developed for prostate cancer.

  2. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  3. Developing a Markup Language for Encoding Graphic Content in Plan Documents

    Science.gov (United States)

    Li, Jinghuan

    2009-01-01

    While deliberating and making decisions, participants in urban development processes need easy access to the pertinent content scattered among different plans. A Planning Markup Language (PML) has been proposed to represent the underlying structure of plans in an XML-compliant way. However, PML currently covers only textual information and lacks…

  4. Grid planning in a competitive environment

    International Nuclear Information System (INIS)

    Quinto, J. de

    2007-01-01

    One principle that the electricity sector must fulfil is to simultaneously guarantee generation free entrance, new and old demand supply and a harmonic network development. This development is contained in the grid planning, a process assumed by a neutral institution apart from the grid or the interests of the market agents: In the case of Spain the ministry. The development of such planning, the investment to be built, are limited by the physical network and formal structure and by how the retribution is designed. In this article there is an evaluation of the problems related to develop the network planning in a competitive environment and also some proposals are suggested. (Author)

  5. Reactive Path Planning Approach for Docking Robots in Unknown Environment

    Directory of Open Access Journals (Sweden)

    Peng Cui

    2017-01-01

    Full Text Available Autonomous robots need to be recharged and exchange information with the host through docking in the long-distance tasks. Therefore, feasible path is required in the docking process to guide the robot and adjust its pose. However, when there are unknown obstacles in the work area, it becomes difficult to determine the feasible path for docking. This paper presents a reactive path planning approach named Dubins-APF (DAPF to solve the path planning problem for docking in unknown environment with obstacles. In this proposed approach the Dubins curves are combined with the designed obstacle avoidance potential field to plan the feasible path. Firstly, an initial path is planned and followed according to the configurations of the robot and the docking station. Then when the followed path is evaluated to be infeasible, the intermediate configuration is calculated as well as the replanned path based on the obstacle avoidance potential field. The robot will be navigated to the docking station with proper pose eventually via the DAPF approach. The proposed DAPF approach is efficient and does not require the prior knowledge about the environment. Simulation results are given to validate the effectiveness and feasibility of the proposed approach.

  6. Astrophysics science operations - Near-term plans and vision

    Science.gov (United States)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  7. 78 FR 57538 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement

    Science.gov (United States)

    2013-09-19

    ..., Chief, Communication, Planning, and Rulemaking Branch Waste Confidence Directorate, Office of Nuclear...-2012-0246] RIN 3150-AJ20 Proposed Waste Confidence Rule and Draft Generic Environmental Impact... disposal (proposed Waste Confidence rule). In addition, the NRC will receive public comment on its...

  8. Efficient Kinect Sensor-Based Reactive Path Planning Method for Autonomous Mobile Robots in Dynamic Environments

    Energy Technology Data Exchange (ETDEWEB)

    Tuvshinjargal, Doopalam; Lee, Deok Jin [Kunsan National University, Gunsan (Korea, Republic of)

    2015-06-15

    In this paper, an efficient dynamic reactive motion planning method for an autonomous vehicle in a dynamic environment is proposed. The purpose of the proposed method is to improve the robustness of autonomous robot motion planning capabilities within dynamic, uncertain environments by integrating a virtual plane-based reactive motion planning technique with a sensor fusion-based obstacle detection approach. The dynamic reactive motion planning method assumes a local observer in the virtual plane, which allows the effective transformation of complex dynamic planning problems into simple stationary ones proving the speed and orientation information between the robot and obstacles. In addition, the sensor fusion-based obstacle detection technique allows the pose estimation of moving obstacles using a Kinect sensor and sonar sensors, thus improving the accuracy and robustness of the reactive motion planning approach. The performance of the proposed method was demonstrated through not only simulation studies but also field experiments using multiple moving obstacles in hostile dynamic environments.

  9. Efficient Kinect Sensor-Based Reactive Path Planning Method for Autonomous Mobile Robots in Dynamic Environments

    International Nuclear Information System (INIS)

    Tuvshinjargal, Doopalam; Lee, Deok Jin

    2015-01-01

    In this paper, an efficient dynamic reactive motion planning method for an autonomous vehicle in a dynamic environment is proposed. The purpose of the proposed method is to improve the robustness of autonomous robot motion planning capabilities within dynamic, uncertain environments by integrating a virtual plane-based reactive motion planning technique with a sensor fusion-based obstacle detection approach. The dynamic reactive motion planning method assumes a local observer in the virtual plane, which allows the effective transformation of complex dynamic planning problems into simple stationary ones proving the speed and orientation information between the robot and obstacles. In addition, the sensor fusion-based obstacle detection technique allows the pose estimation of moving obstacles using a Kinect sensor and sonar sensors, thus improving the accuracy and robustness of the reactive motion planning approach. The performance of the proposed method was demonstrated through not only simulation studies but also field experiments using multiple moving obstacles in hostile dynamic environments

  10. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  11. Integrated production-distribution planning optimization models: A review in collaborative networks context

    Directory of Open Access Journals (Sweden)

    Beatriz Andres

    2017-01-01

    Full Text Available Researchers in the area of collaborative networks are more and more aware of proposing collaborative approaches to address planning processes, due to the advantages associated when enterprises perform integrated planning models. Collaborative production-distribution planning, among the supply network actors, is considered a proper mechanism to support enterprises on dealing with uncertainties and dynamicity associated to the current markets. Enterprises, and especially SMEs, should be able to overcome the continuous changes of the market by increasing their agility. Carrying out collaborative planning allows enterprises to enhance their readiness and agility for facing the market turbulences. However, SMEs have limited access when incorporating optimization tools to deal with collaborative planning, reducing their ability to respond to the competition. The problem to solve is to provide SMEs affordable solutions to support collaborative planning. In this regard, new optimisation algorithms are required in order to improve the collaboration within the supply network partners. As part of the H2020 Cloud Collaborative Manufacturing Networks (C2NET research project, this paper presents a study on integrated production and distribution plans. The main objective of the research is to identify gaps in current optimization models, proposed to address integrated planning, taking into account the requirements and needs of the industry. Thus, the needs of the companies belonging to the industrial pilots, defined in the C2NET project, are identified; analysing how these needs are covered by the optimization models proposed in the literature, to deal with the integrated production-distribution planning.

  12. 76 FR 10530 - Supplemental Proposed Rule of Source Specific Federal Implementation Plan for Implementing Best...

    Science.gov (United States)

    2011-02-25

    ... sufficient ammonia to maximize the reduction of the NO X no matter what the age of the catalyst.\\7\\ \\5\\ The... BART proposal with our technical evaluation of APS' alternative proposal. We are proposing to find that... docket are listed in the index, some information may be publicly available only at the hard copy location...

  13. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  14. Post-Chernobyl emergency planning

    International Nuclear Information System (INIS)

    1986-01-01

    This report is the result of a study ordered by the Swedish Nuclear Power Inspectorate and the National Swedish Institute of Radiation Protection to evaluate the measurements taken in Sweden in response to the Chernobyl accident. The enquiry was also given the task of suggesting improvements of the nuclear accidents emergency planning and other activities relevant to nuclear accidents. Detailed accounts are given of the course of events in Sweden at the Chernobyl accident and the steps taken by central or local authorities are discussed. Several alterations of the emergency planning are proposed and a better coordination of the affected organizations is suggested. (L.E.)

  15. Life Cycle Assessment in Spatial Planning

    DEFF Research Database (Denmark)

    Bidstrup, Morten; Pizzol, Massimo; Schmidt, Jannick Højrup

    2015-01-01

    Spatial planning establishes conditions for societal patterns of production and consumption. However, the assigned Strategic Environmental Assessments (SEA) tend to have a too narrow focus. In particular, there is a need for applying a system perspective in SEA, extending assessment beyond...... towards operationalising LCA in SEA by adjusting LCA methodology to focus on the ways planners and planning processes can influence the environmental impacts of interconnected activities. The proposed procedure was tested on a case study of Danish extraction planning, and it was found to generate new...... knowledge for decision support. The procedure enabled identification of key systemic impacts, as well as it enabled formulation of recommendations for how to address these impacts in planning processes. On a more general level, this article demonstrates an application of LCA which until now has received...

  16. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  17. Development process for integrated water resources management plan under a bottom-up participation perspective

    Directory of Open Access Journals (Sweden)

    Kittiwet Kuntiyawichai

    2014-06-01

    Full Text Available This article presents the development process for the integrated water resources management and development plan of Maha Sarakham Province by considering the priority and urgency of water problem issues. Gathering feedback from stakeholders and prioritizing water management and development projects are also taken into consideration. In view of integrated plans, the project is classified into short-, medium- and long-term plans with the project duration of 2 years, 3 years and 5 years, respectively. In this case, the plans can be categorized into proposed provincial and local plans. Firstly, the comprehensive provincial plans can be divided into 2 groups, i.e. district plans with the total number of 532 plans, which comprise of 505 projects for coping with drought and 27 projects for flood mitigation, and provincial plans from 13 agencies with the amount of 513 projects, which include 396 projects and 117 projects for dealing with drought and flood, respectively. Secondly, there are 4,099 of local plans to be put in place, in which 3,973 projects and 126 projects are proposed to handle drought and flood problems, respectively. From the analysis, it is found that if all planned drought relief projects are implemented, the water demand for domestic and agricultural needs could be covered by 96% and 51%, respectively. In case of the entire proposed flood alleviation projects are executed, 29% of the total flood prone areas can be effectively protected.

  18. Propositions of measures for the Climate plan 2003; Propositions de mesures pour le plan climat 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    In the framework of the PNLCC (national plan for the fight against the climatic change), the ''Plan Climat'' constitutes an operational and pragmatic tool for the measures application. The Climate Action network (RAC) precise in this document its point of view and its wishes for the ''Plan Climat'' in the energy sector, the transportation sector, the industry and fluoride gases sector, the construction sector, the wastes sector, the agriculture and forests sector, the local collectivities sector and the information and communication sector. For each sector, measures and actions are proposed, some need to be apply immediately, other are new ideas which are not pointed out in the PNLCC. (A.L.B.)

  19. 77 FR 33745 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2012-06-07

    ... Information Collection Activity; Comment Request Proposed Projects Title: Native Employment Works (NEW) Program Plan Guidance and Report Requirements. OMB No.: 0970-0174. Description The Native Employment Works... collection techniques or other forms of information technology. Consideration will be given to comments and...

  20. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  1. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  2. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  3. Buffer Zone Requirements for Soil Fumigant Applications

    Science.gov (United States)

    Updated pesticide product labels require fumigant users to establish a buffer zone around treated fields to reduce risks to bystanders. Useful information includes tarp testing guidance and a buffer zone calculator.

  4. Analysis of Propagation Plans in NSF-Funded Education Development Projects

    Science.gov (United States)

    Stanford, Courtney; Cole, Renee; Froyd, Jeff; Henderson, Charles; Friedrichsen, Debra; Khatri, Raina

    2017-08-01

    Increasing adoption and adaptation of promising instructional strategies and materials has been identified as a critical component needed to improve science, technology, engineering, and mathematics (STEM) education. This paper examines typical propagation practices and resulting outcomes of proposals written by developers of educational innovations. These proposals were analyzed using the Designing for Sustained Adoption Assessment Instrument (DSAAI), an instrument developed to evaluate propagation plans, and the results used to predict the likelihood that a successful project would result in adoption by others. We found that few education developers propose strong propagation plans. Afterwards, a follow-up analysis was conducted to see which propagation strategies developers actually used to help develop, disseminate, and support their innovations. A web search and interviews with principal investigators were used to determine the degree to which propagation plans were actually implemented and to estimate adoption of the innovations. In this study, we analyzed 71 education development proposals funded by the National Science Foundation and predicted that 80% would be unsuccessful in propagating their innovations. Follow-up data collection with a subset of these suggests that the predictions were reasonably accurate.

  5. Comparative analysis of proposals for the planning of the aggregate industry on the island of Tenerife

    Energy Technology Data Exchange (ETDEWEB)

    HernAndez-Duran, G.; Arranz-Gonzalez, C.; Vega-Panizo, R. de la

    2016-07-01

    The island of Tenerife is a territory with numerous protected natural areas and other areas which also deserve environmental protection, due to their ecological and landscape richness and values. According to current planning regulations, the aggregate mining industry is limited to a number of areas called extractive zones. The delimitation of such areas has some flaws and inconsistencies from the environmental point of view and from the consideration of the productive capacity of mining resources. This paper shows two models for environmental planning applied to the extractive activity for aggregates for the island of Tenerife, which could serve as alternatives to the current planning model: a model called zoned and another designated as zone- concentrated. These models provide improvements as far as respect for environmental values are concerned and are based on knowledge of the spatial distribution of geological materials. The conclusion is that this knowledge of the distribution of the potential mineral resources in the territory is the key to achieving the effective integration of mining in land-use planning, and to safeguard in the best possible way the mineral resources from the activities that may compromise their future availability. The applied methods could be extended to other territories, particularly islands, where it is very possible that there are similar problems to those that are occurring in Tenerife. (Author)

  6. Distribution Network Expansion Planning Based on Multi-objective PSO Algorithm

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Wu, Qiuwei

    2013-01-01

    This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO...... algorithm was proposed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified...

  7. Distribution network planning method considering distributed generation for peak cutting

    International Nuclear Information System (INIS)

    Ouyang Wu; Cheng Haozhong; Zhang Xiubin; Yao Liangzhong

    2010-01-01

    Conventional distribution planning method based on peak load brings about large investment, high risk and low utilization efficiency. A distribution network planning method considering distributed generation (DG) for peak cutting is proposed in this paper. The new integrated distribution network planning method with DG implementation aims to minimize the sum of feeder investments, DG investments, energy loss cost and the additional cost of DG for peak cutting. Using the solution techniques combining genetic algorithm (GA) with the heuristic approach, the proposed model determines the optimal planning scheme including the feeder network and the siting and sizing of DG. The strategy for the site and size of DG, which is based on the radial structure characteristics of distribution network, reduces the complexity degree of solving the optimization model and eases the computational burden substantially. Furthermore, the operation schedule of DG at the different load level is also provided.

  8. Technical Meeting on Existing and Proposed Experimental Facilities for Fast Neutron Systems. Presentations

    International Nuclear Information System (INIS)

    2013-01-01

    The objective of the TM on “Existing and proposed experimental facilities for fast neutron systems” is threefold: first, it is intended for presenting and exchanging information about existing and planned experimental facilities in support of the development of innovative fast neutron systems; second, it will allow to create a catalogue of existing and planned experimental facilities currently operated/developed within national or international fast reactors programmes; third, once a clear picture of the existing experimental infrastructures is defined, new experimental facilities will be discussed and proposed, on the basis of the identified R&D needs

  9. 75 FR 5745 - Pacific Halibut Fisheries; Catch Sharing Plan

    Science.gov (United States)

    2010-02-04

    ... management measures that are not implemented through the IPHC. This includes tribal regulations and the sport... the recreational halibut hotline. Proposed 2010 Sport Fishery Management Measures NMFS is proposing sport fishery management measures that are necessary to implement the Plan in 2010. The annual domestic...

  10. A 3D motion planning framework for snake robots

    OpenAIRE

    Liljebäck, Pål; Pettersen, Kristin Ytterstad; Stavdahl, Øyvind; Gravdahl, Jan Tommy

    2014-01-01

    - Author's postprint This paper presents a motion planning framework for three-dimensional body shape control of snake robots. Whereas conventional motion planning approaches define the body shape of snake robots in terms of their individual joint angles, the proposed framework allows the body shape to be specified in terms of Cartesian coordinates in the environment of the robot. This approach simplifies motion planning since Cartesian coordinates are more intuitively mapped to the overal...

  11. A Mission Planning Approach for Precision Farming Systems Based on Multi-Objective Optimization

    Directory of Open Access Journals (Sweden)

    Zhaoyu Zhai

    2018-06-01

    Full Text Available As the demand for food grows continuously, intelligent agriculture has drawn much attention due to its capability of producing great quantities of food efficiently. The main purpose of intelligent agriculture is to plan agricultural missions properly and use limited resources reasonably with minor human intervention. This paper proposes a Precision Farming System (PFS as a Multi-Agent System (MAS. Components of PFS are treated as agents with different functionalities. These agents could form several coalitions to complete the complex agricultural missions cooperatively. In PFS, mission planning should consider several criteria, like expected benefit, energy consumption or equipment loss. Hence, mission planning could be treated as a Multi-objective Optimization Problem (MOP. In order to solve MOP, an improved algorithm, MP-PSOGA, is proposed, taking advantages of the Genetic Algorithms and Particle Swarm Optimization. A simulation, called precise pesticide spraying mission, is performed to verify the feasibility of the proposed approach. Simulation results illustrate that the proposed approach works properly. This approach enables the PFS to plan missions and allocate scarce resources efficiently. The theoretical analysis and simulation is a good foundation for the future study. Once the proposed approach is applied to a real scenario, it is expected to bring significant economic improvement.

  12. Hierarchical Planning Methodology for a Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Virna ORTIZ-ARAYA

    2012-01-01

    Full Text Available Hierarchical production planning is a widely utilized methodology for real world capacitated production planning systems with the aim of establishing different decision–making levels of the planning issues on the time horizon considered. This paper presents a hierarchical approach proposed to a company that produces reusable shopping bags in Chile and Perú, to determine the optimal allocation of resources at the tactical level as well as over the most immediate planning horizon to meet customer demands for the next weeks. Starting from an aggregated production planning model, the aggregated decisions are disaggregated into refined decisions in two levels, using a couple of optimization models that impose appropriate constraints to keep coherence of the plan on the production system. The main features of the hierarchical solution approach are presented.

  13. Towards a European Energy Technology Policy - The European Strategic Energy Technology Plan (Set-Plan)

    International Nuclear Information System (INIS)

    Mercier, A.; Petric, H.; Peteves, E.

    2008-01-01

    The transition to a low carbon economy will take decades and affect the entire economy. There is a timely opportunity for investment in energy infrastructure. However, decisions to invest in technologies that are fully aligned with policy and society priorities do not necessarily come naturally, although it will profoundly affect the level of sustainability of the European energy system for decades to come. Technology development needs to be accelerated and prioritized at the highest level of the European policy agenda. This is the essence of the European Strategic Energy Technology Plan (SET-Plan). The SET-Plan makes concrete proposals for action to establish an energy technology policy for Europe, with a new mind-set for planning and working together and to foster science for transforming energy technologies to achieve EU energy and climate change goals for 2020, and to contribute to the worldwide transition to a low carbon economy by 2050. This paper gives an overview of the SET-Plan initiative and highlights its latest developments. It emphasises the importance of information in support of decision-making for investing in the development of low carbon technologies and shows the first results of the technology mapping undertaken by the newly established Information System of the SET-Plan (SETIS).(author)

  14. Optimal motion planning using navigation measure

    Science.gov (United States)

    Vaidya, Umesh

    2018-05-01

    We introduce navigation measure as a new tool to solve the motion planning problem in the presence of static obstacles. Existence of navigation measure guarantees collision-free convergence at the final destination set beginning with almost every initial condition with respect to the Lebesgue measure. Navigation measure can be viewed as a dual to the navigation function. While the navigation function has its minimum at the final destination set and peaks at the obstacle set, navigation measure takes the maximum value at the destination set and is zero at the obstacle set. A linear programming formalism is proposed for the construction of navigation measure. Set-oriented numerical methods are utilised to obtain finite dimensional approximation of this navigation measure. Application of the proposed navigation measure-based theoretical and computational framework is demonstrated for a motion planning problem in a complex fluid flow.

  15. Technical Notes: Notes and Proposed Guidelines on Updated ...

    African Journals Online (AJOL)

    In light of recent expansion in the planning and construction of major building structures as well as other infrastructures such as railways, masshousing, dams, bridges, etc, this paper reviews the extent of seismic hazard in Ethiopia and proposes a review and update of the current out-dated and - in most cases ...

  16. Candidates stick to party guns. In lieu of new healthcare plans, Bush, Gore follow party reform proposals.

    Science.gov (United States)

    Gardner, J; Hallam, K

    2000-07-03

    As the Democratic and GOP nominating conventions approach next month, presumptive nominees Al Gore and George W. Bush are offering no new healthcare plans, both preferring to ride the healthcare waves already set in motion by their respective party's leadership. And the really interesting thing is, the plans aren't that different. Call it creeping incrementalism.

  17. Statement of Basis/Proposed Plan for the Motor Shops Seepage Basin (716-A); FINAL

    International Nuclear Information System (INIS)

    Palmer, E.

    1998-01-01

    The purpose of this plan is to describe the preferred alternative for addressing the Motor Shops Seepage Basin located at the Savannah River site in Aiken County, Aiken, South Carolina and to provide an opportunity for public input into the remedial action selection process

  18. Implementation intention and action planning interventions in health contexts: state of the research and proposals for the way forward.

    Science.gov (United States)

    Hagger, Martin S; Luszczynska, Aleksandra

    2014-03-01

    The purpose of this paper is to provide an overview of the literature on two planning intervention techniques in health behaviour research, implementation intentions and action planning, and to develop evidence-based recommendations for effective future interventions and highlight priority areas for future research. We focused our review on four key areas: (1) definition and conceptualisation; (2) format and measurement; (3) mechanisms and processes; and (4) design issues. Overall, evidence supports the effectiveness of planning interventions in health behaviour with advantages including low cost and response burden. There is, however, considerable heterogeneity in the effects across studies and relatively few registered randomised trials that include objective behavioural measures. Optimally effective planning interventions should adopt "if-then" plans, account for salient and relevant cues, include examples of cues, be guided rather than user-defined, and include boosters. Future studies should adopt randomised controlled designs, report study protocols, include fidelity checks and relevant comparison groups, and adopt long-term behavioural follow-up measures. Priority areas for future research include the identification of the moderators and mediators of planning intervention effects. Future research also needs to adopt "best practice" components of planning interventions more consistently to elucidate the mechanisms and processes involved. © 2013 The International Association of Applied Psychology.

  19. 78 FR 29140 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2013-05-17

    ... outcomes, reduce criminal recidivism and improve family engagement. The STED and ETJD projects have...; Follow-Up Surveys (6, 12, and 30 months); and Implementation Research and Site Visits. The proposed..., Office of Planning, Research and Evaluation, 370 L'Enfant Promenade, SW., Washington, DC 20447, Attn...

  20. The Resection Map : A proposal for intraoperative hepatectomy guidance

    NARCIS (Netherlands)

    Lamata, P.; Jalote-Parmar, A.; Lamata, F.; Declerck, J.

    2008-01-01

    Objective - To propose a new concept of an intra-operative 3D visualisation system to support hepatectomies. This system aims at improving the transfer of pre-operative planning into the intra-operative stage, both in laparoscopic and open approaches. Materials and methods - User (surgeon) centred

  1. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  2. Technical Meeting on Existing and Proposed Experimental Facilities for Fast Neutron Systems. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    The objective of the TM on “Existing and proposed experimental facilities for fast neutron systems” was threefold: 1) presenting and exchanging information about existing and planned experimental facilities in support of the development of innovative fast neutron systems; 2) allow creating a catalogue of existing and planned experimental facilities currently operated/developed within national or international fast reactors programmes; 3) once a clear picture of the existing experimental infrastructures is defined, new experimental facilities are discussed and proposed, on the basis of the identified R&D needs

  3. Optimal day-ahead operational planning of microgrids

    International Nuclear Information System (INIS)

    Hosseinnezhad, Vahid; Rafiee, Mansour; Ahmadian, Mohammad; Siano, Pierluigi

    2016-01-01

    Highlights: • A new multi-objective model for optimal day-ahead operational planning of microgrids is proposed. • A new concept called seamlessness is introduced to control the sustainability of microgrid. • A new method is developed to manage the load and renewable energy resources estimation errors. • A new solution based on a combination of numerical and evolutionary approaches is proposed. - Abstract: Providing a cost-efficient, eco-friendly and sustainable energy is one of the main issues in modern societies. In response to this demand, new features of microgrid technology have provided huge potentials while distributing electricity more effectively, economically and securely. Accordingly, this paper presents a new multi-objective generation management model for optimal day-ahead operational planning of medium voltage microgrids. The proposed model optimizes both pollutant emission and operating cost of a microgrid by using multi-objective optimization. Besides, a seamlessness-selective algorithm is integrated into the model, which can be adopted to achieve the desired self-sufficiency level for microgrids along a specified planning horizon. Furthermore, the model is characterized by a reserve-assessment strategy developed to handle the load and renewable energy resources estimation errors. The introduced model is solved using a combination of numerical and evolutionary methods of species-based quantum particle swarm optimization to find the optimal scheduling scheme and minos-based optimal power flow to optimize the operating cost and emission. In addition, the suggested solution approach also incorporates an efficient mechanism for considering energy storage systems and coding the candidate solutions in the evolutionary algorithm. The proposed model is implemented on a test microgrid and is investigated through simulations to study the different aspects of the problem. The results show significant improvements and benefits which are obtained by

  4. Sustainable resource planning in energy markets

    International Nuclear Information System (INIS)

    Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei

    2014-01-01

    Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method

  5. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  6. 77 FR 68139 - Notice of Proposed Information Collection: Comment Request; Multifamily Housing Service...

    Science.gov (United States)

    2012-11-15

    ... affected agencies concerning the proposed collection of information to: 1. Evaluate whether the proposed... technology, e.g., permitting electronic submission of responses. This Notice also lists the following... residents and Attendance at or planning of community events, and H. Adding a new section to track aging in...

  7. Designing a two-rank acceptance sampling plan for quality inspection of geospatial data products

    Science.gov (United States)

    Tong, Xiaohua; Wang, Zhenhua; Xie, Huan; Liang, Dan; Jiang, Zuoqin; Li, Jinchao; Li, Jun

    2011-10-01

    To address the disadvantages of classical sampling plans designed for traditional industrial products, we originally propose a two-rank acceptance sampling plan (TRASP) for the inspection of geospatial data outputs based on the acceptance quality level (AQL). The first rank sampling plan is to inspect the lot consisting of map sheets, and the second is to inspect the lot consisting of features in an individual map sheet. The TRASP design is formulated as an optimization problem with respect to sample size and acceptance number, which covers two lot size cases. The first case is for a small lot size with nonconformities being modeled by a hypergeometric distribution function, and the second is for a larger lot size with nonconformities being modeled by a Poisson distribution function. The proposed TRASP is illustrated through two empirical case studies. Our analysis demonstrates that: (1) the proposed TRASP provides a general approach for quality inspection of geospatial data outputs consisting of non-uniform items and (2) the proposed acceptance sampling plan based on TRASP performs better than other classical sampling plans. It overcomes the drawbacks of percent sampling, i.e., "strictness for large lot size, toleration for small lot size," and those of a national standard used specifically for industrial outputs, i.e., "lots with different sizes corresponding to the same sampling plan."

  8. Information Systems for University Planning.

    Science.gov (United States)

    Robinson, Robert J.

    This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…

  9. An LNS Approach for Container Stowage Multi-port Master Planning

    DEFF Research Database (Denmark)

    Pacino, Dario

    2013-01-01

    The generation of competitive stowage plans have become a priority for the shipping industry. Stowage planning is NP-hard and is a challenging optimization problem in practice. Two-phase decomposition approaches have proved to give viable solutions. We propose a large neighborhood search (LNS) to...

  10. Improved Collaborative Transport Planning at Dutch Logistics Service Provider Fritom

    NARCIS (Netherlands)

    Buijs, Paul; Lopez Alvarez, Jose Alejandro; Veenstra, Marjolein; Roodbergen, Kees Jan

    2016-01-01

    We study the collaborative transport planning for two autonomous business units of Fritom, a Dutch logistics service provider. This difficult planning problem does not fit any existing type of vehicle routing problem proposed in the academic literature; therefore, we define a new problem class, the

  11. Annual plan, December 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  12. Thermal-hydraulic research plan for Babcock and Wilcox plants

    International Nuclear Information System (INIS)

    Lee, R.Y.

    1988-02-01

    This document presents a plan for thermal-hydraulic research for Babcock and Wilcox designed reactor systems. It describes the technical issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research, and provides a tentative schedule to complete the required work

  13. 75 FR 45572 - Oil Pollution Prevention; Spill Prevention, Control, and Countermeasure (SPCC) Rule-Proposed...

    Science.gov (United States)

    2010-08-03

    ... Oil Pollution Prevention; Spill Prevention, Control, and Countermeasure (SPCC) Rule--Proposed... Federal Regulations is proposed to be amended as follows: PART 112--OIL POLLUTION PREVENTION 1. The... certain facilities must prepare or amend their Spill Prevention, Control, and Countermeasure (SPCC) Plans...

  14. Socially rational agents in spatial land use planning: a heuristic proposal based negotiation mechanism

    NARCIS (Netherlands)

    Ghavami, S.M.; Taleai, M.; Arentze, T.A.

    2016-01-01

    This paper introduces a novel heuristic based negotiation model for urban land use planning by using multi-agent systems. The model features two kinds of agents: facilitator and advocate. Facilitator agent runs the negotiation according to a certain protocol that defines the procedure. Two roles are

  15. 76 FR 2871 - Pacific Halibut Fisheries; Catch Sharing Plan

    Science.gov (United States)

    2011-01-18

    ... management measures that are not implemented through the IPHC. This includes Tribal regulations and the sport...-Halibut/Pacific-Halibut/Index.cfm . Proposed 2011 Sport Fishery Management Measures NMFS is proposing sport fishery management measures that are necessary to implement the Plan in 2011. The annual domestic...

  16. Collective Travel Planning in Spatial Networks

    KAUST Repository

    Shang, Shuo; Chen, Lisi; Wei, Zhewei; Jensen, Christian S.; Wen, Ji-Rong; Kalnis, Panos

    2017-01-01

    We propose and investigate a novel query, the Collective Travel Planning (CTP) query, that finds the lowest-cost route connecting multiple query sources and a destination via at most k meeting points. This type of query is useful in organizing large

  17. National plan for adaptation to climate change

    International Nuclear Information System (INIS)

    2011-01-01

    This report first explains the rationale for such a plan, and discusses the costs associated to climate change impacts. It presents two scenarios for climate change in France during the 21. century, highlights the weight of uncertainty for the results of these scenarios, and indicates some current consequences. Then, it presents the Plan content and gives an overview of the Plan governance and evaluation. It proposes a set of action sheets which contain the main adopted measures and briefly describe some implemented or projected actions. These sheets concern the different fields of application of the plan: cross-cutting actions, health, water resources, biodiversity, natural hazards, agriculture, forest, fishery and aquaculture, energy and industry, transport infrastructures and systems, urban planning and built environment, tourism, information, education and training, research, finance and insurance, coasts, mountains, European and international actions, governance

  18. Generation capacity expansion planning in deregulated electricity markets

    Science.gov (United States)

    Sharma, Deepak

    With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the

  19. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  20. Telecommunications Network Plan

    International Nuclear Information System (INIS)

    1989-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affected by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM's information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program's Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs