WorldWideScience

Sample records for plan spmp revision

  1. Automated Transportation Management System (ATMS) Software Project Management Plan (SPMP). Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S.

    1995-05-26

    As a cabinet level federal agency with a diverse range of missions and an infrastructure spanning the United States, the US Department of Energy (DOE) has extensive freight transportation requirements. Performance and management of this freight activity is a critical function. DOE`s Transportation Management Division (TMD) has an agency-wide responsibility for overseeing transportation activities. Actual transportation operations are handled by government or contractor staff at the field locations. These staff have evolved a diverse range of techniques and procedures for performing transportation functions. In addition to minimizing the economic impact of transportation on programs, facility transportation staff must be concerned with the increasingly complex task of complying with complex shipment safety regulations. Maintaining the department`s safety record for shipping hazardous and radioactive materials is a primary goal. Use of automation to aid transportation functions is not widespread within DOE, though TMD has a number of software systems designed to gather and analyze data pertaining to field transportation activities. These systems are not integrated. Historically, most field facilities have accomplished transportation-related tasks manually or with minimal computer assistance. At best, information and decision support systems available to transportation staffs within the facilities are fragmented. In deciding where to allocate resources for automation, facility managers have not tended to give the needs of transportation departments a high priority. This diversity causes TMD significant difficulty in collecting data for use in managing department-wide transportation activities.

  2. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  3. HLW system plan - revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-14

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

  4. Parker River NWR : Revised Hunting Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains revisions to the 1978 Parker River National Wildlife Refuge Hunt Management Plan. Refuge hunters must obtain a permit to use the hunting...

  5. Plan-Belief Revision in Jason

    DEFF Research Database (Denmark)

    Jensen, Andreas Schmidt; Villadsen, Jørgen

    2015-01-01

    When information is shared between agents of unknown reliability, it is possible that their belief bases become inconsistent. In such cases, the belief base must be revised to restore consistency, so that the agent is able to reason. In some cases the inconsistent information may be due to use of...... of incorrect plans. We extend work by Alechina et al. to revise belief bases in which plans can be dynamically added and removed. We present an implementation of the algorithm in the AgentSpeak implementation Jason....

  6. School Emergency Planning Guide. [Revised.

    Science.gov (United States)

    Pennsylvania State Emergency Management Agency, Harrisburg.

    Guidelines to help school districts in Pennsylvania recognize potential hazards and develop a plan of community action are presented in this guidebook. The 1988 Emergency Management Services Code requires that every publicly funded state school have a disaster response plan that is exercised annually. Further, all publicly funded educational…

  7. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  8. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  9. DWPF Development Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Holtzscheiter, E.W.

    1994-05-09

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ``DWPF Process Development Systems.`` To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant.

  10. Delmarva Fox Squirrel Recovery Plan Second Revision 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following recovery plan is the second revision of the Delmarva Fox Squirrel Recovery Plan and is based upon information obtained from previous planning efforts...

  11. Environmental Assessment Revised Hunting Plan Erie National Wildlife Refuge 1987

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 1984 a serious review of the existing plans led to a decision to completely post the boundary and make the necessary revisions/addendums to the hunting plan that...

  12. Indiana Bat (Myotis sodalis) Draft Recovery Plan: First Revision

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — U.S. Fish and Wildlife Service's Draft recovery plan for Indiana bats, a Federally endangered species. First revision. The purpose of this draft recovery plan is to...

  13. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  14. 33 CFR 151.28 - Plan review and revision.

    Science.gov (United States)

    2010-07-01

    ... BALLAST WATER Implementation of MARPOL 73/78 and the Protocol on Environmental Protection to the Antarctic Treaty as it Pertains to Pollution from Ships Oil Pollution § 151.28 Plan review and revision. (a)...

  15. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  16. Solid Waste Management Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  17. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  18. Selenium Polysaccharide SPMP-2a from Pleurotus geesteranus Alleviates H2O2-Induced Oxidative Damage in HaCaT Cells

    Directory of Open Access Journals (Sweden)

    Yujun Sun

    2017-01-01

    Full Text Available Selenium- (Se- enriched polysaccharide SPMP-2a was extracted and purified from Pleurotus geesteranus. SPMP-2a is a white flocculent polysaccharide and soluble in water, with a molecular weight of 3.32 × 104 Da. Fourier transform infrared spectroscopy spectral analysis indicated that it belongs to an acid Se polysaccharide with α-D-glucopyranoside bond. The effects of Se polysaccharide SPMP-2a in P. geesteranus against hydrogen peroxide- (H2O2- induced oxidative damage in human keratinocytes (HaCaT cells were evaluated further. Reduced cell viability and elevated apoptotic rates in H2O2-treated HaCaT cells were proven by MTT and flow cytometry assays. Hoechst 33342 staining revealed chromatin condensations in the nuclei of HaCaT cells. However, with the addition of SPMP-2a, cell viability improved, nuclear condensation declined, and cell apoptotic rates dropped significantly. Ultrastructural observation consistently revealed that treatments with SPMP-2a reduced the number of swollen and vacuolar mitochondria in the H2O2-treated cells compared with the controls. Furthermore, SPMP-2a increased the superoxide dismutase (SOD and catalase (CAT activities and reduced reactive oxygen species (ROS content. Western blot analysis showed that SPMP-2a treatment effectively increased B-cell lymphoma 2 (Bcl-2 protein expression. Therefore, SPMP-2a could improve cellular antioxidant enzyme activities, reduce ROS levels, and increase Bcl-2 protein expression levels, thereby reducing cell apoptosis and protecting HaCaT cells from H2O2-induced oxidative damage.

  19. 78 FR 78326 - Revision of the Land Management Plans for the Inyo, Sierra and Sequoia National Forests

    Science.gov (United States)

    2013-12-26

    ... notice should be addressed to Land Management Plan Revision, U.S. Forest Service, Ecosystem Planning... planning process, which is revising the land management plans. The first task of plan revision is to... second stage of the planning process, the development of the land management plan revisions. Once the...

  20. 75 FR 21221 - Plan Revision for Kaibab National Forest; Coconino, Yavapai, and Mojave Counties; AZ

    Science.gov (United States)

    2010-04-23

    ... planning rule and how work done on the plan revision under the 2008 planning rule will be used or modified... Revision Team, 800 S. 6th St., Williams, Arizona 86046. Comments may also be sent via e-mail to... a primary area of focus. The revised Forest Plan will define desired characteristics...

  1. Water management plan : revised March 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Content of the Ruby Lake NWR Water Management Plan includes information on refuge background, objectives and management strategies, and water management program...

  2. Revised Hunting Plan : Sherburne National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan provides guidelines for the administration of hunting activity and for the development, maintenance, and enforcement of regulations and guidelines on...

  3. SSC San Diego Strategic Plan. Revision 3

    Science.gov (United States)

    2001-11-01

    OMB control number. 1. REPORT DATE NOV 2001 2. REPORT TYPE 3. DATES COVERED - 4. TITLE AND SUBTITLE SSC San Diego Strategic Plan. Rev 3 5a...Business Improvement Group ( CBIG ), will be composed of the team members listed above, and will be responsible for monitoring the planning and...implementation of these objectives. The CBIG will charter sub-groups as necessary. Improve Corporate IT infrastructure Much of the SSC San Diego IT service

  4. 100-D Ponds closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.

  5. 75 FR 45080 - Revisions to the California State Implementation Plan

    Science.gov (United States)

    2010-08-02

    ... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) emissions from boilers, steam... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June... from boilers, steam generators, process heaters and water heaters with a total rated heat input...

  6. Cui-ui recovery plan : Second revision

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Cui-ui is an endangered fish species that exists only in Pyramid Lake, Nevada. The plan describes the distribution of cui-ui, the life history and habitat of cui-ui,...

  7. Buried Waste Integrated Demonstration Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  8. Nevada Test Site Treatment Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada`s input. The options and schedules reflect a ``bottoms-up`` approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions.

  9. Planning integration FY 1996 program plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  10. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality Management...

  11. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD or...

  12. Cropland Management Plan : Tewaukon National Wildlife Refuge Complex : Revised: April 1, 1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document serves as a revision to the Tewaukon National Wildlife Refuge Complex's (TRC) then present cropland management plan. This revision more completely...

  13. 76 FR 68698 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Science.gov (United States)

    2011-11-07

    ...- 9487-7] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen... Commonwealth of Virginia that revises regulatory language that inadvertently ended its nitrogen oxides (NO...

  14. Mixed Waste Management Facility, revised FY94 Plan

    Energy Technology Data Exchange (ETDEWEB)

    Streit, R.

    1994-07-31

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94.

  15. 36 CFR 9.40 - Supplementation or revision of plan of operations.

    Science.gov (United States)

    2010-07-01

    ... of plan of operations. 9.40 Section 9.40 Parks, Forests, and Public Property NATIONAL PARK SERVICE... revision of plan of operations. (a) A proposal to supplement or revise an approved plan of operations may... to address conditions not previously contemplated by notifying the appropriate party in writing...

  16. 77 FR 74688 - Final Recovery Plan, First Revision; Mexican Spotted Owl

    Science.gov (United States)

    2012-12-17

    ... Fish and Wildlife Service Final Recovery Plan, First Revision; Mexican Spotted Owl AGENCY: Fish and... Service, announce the availability of our final recovery plan, first revision, for the Mexican Spotted Owl... and threatened wildlife and plants. ADDRESSES: If you wish to view the recovery plan, you may obtain...

  17. High-Level Waste Systems Plan. Revision 7

    Energy Technology Data Exchange (ETDEWEB)

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996.

  18. NRC drug-free workplace plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ``NRC Drug-Free Workplace Plan,`` supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance.

  19. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  20. 75 FR 45082 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2010-08-02

    ... Air Pollution Control District (SBCAPCD) portion of the California State Implementation Plan (SIP... Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  1. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  2. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental...

  3. Revised Comprehensive Conservation Plan and Environmental Impact Statement: Volumes 1 and 2- Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Revised Comprehensive Conservation Plan (Plan) and Environmental Impact Statement (EIS) for the Kenai National Wildlife Refuge will guide management of the...

  4. 75 FR 13253 - Plan Revision for Lake Tahoe Basin Management Unit, Alpine, El Dorado, and Placer Counties, CA...

    Science.gov (United States)

    2010-03-19

    ... management plan (forest plan) and will also prepare an environmental impact statement (EIS) for this revised... Be Made The Lake Tahoe Basin Management Unit is preparing an EIS to revise the current forest plan... Forest Service Plan Revision for Lake Tahoe Basin Management Unit, Alpine, El Dorado, and Placer Counties...

  5. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  6. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Science.gov (United States)

    2013-11-04

    ... SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11... potentially affected parties on its draft revised strategic plan. DNFSB will consider all comments received...

  7. 77 FR 64310 - Shoshone National Forest, WY, Revised Land and Resource Management Plan

    Science.gov (United States)

    2012-10-19

    ... Forest Service Shoshone National Forest, WY, Revised Land and Resource Management Plan AGENCY: Forest... (USDA) Forest Service (USFS), Shoshone National Forest announces the extension of the comment period for the Shoshone National Forest Land Management Plan Revision Draft Environmental Impact Statement. The...

  8. 75 FR 48894 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to Emissions...

    Science.gov (United States)

    2010-08-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; New Mexico... Mexico State Implementation Plan (SIP). These revisions concern two separate actions. First, we are... pollutants such as ozone, particulate matter, and carbon monoxide. The revisions add new definitions,...

  9. 77 FR 46128 - Proposed Revision 0 to Standard Review Plan Section 19.5: Adequacy of Design Features and...

    Science.gov (United States)

    2012-08-02

    ... proposed revision to its Standard Review Plan (SRP), NUREG-0800, ``Standard Review Plan for the Review of... the final approved guidance into the next revision of NUREG-0800. The SRP is guidance for the...

  10. 78 FR 67327 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Revised...

    Science.gov (United States)

    2013-11-12

    ... are not included in a metropolitan planning organization's transportation plan and transportation.... Organizations such as metropolitan planning organizations (MPO), state and local air quality planning agencies... to revise and supersede the conformity SIP that was previously approved by EPA in 2001 (66 FR...

  11. 78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest

    Science.gov (United States)

    2013-11-04

    ... Management Plan which describes the strategic direction for management of forest resources for the next ten... plans. Forest plans describe the strategic direction for management of forest resources for ten to... Forest Service Revision of the Land Management Plan for the Flathead National Forest AGENCY:...

  12. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  13. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

  14. 78 FR 63878 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Science.gov (United States)

    2013-10-25

    ... Ambient Air Quality Standards for Fine Particulate Matter AGENCY: Environmental Protection Agency (EPA... Commonwealth of Virginia State Implementation Plan (SIP). The revisions add ambient air quality standards and... National Ambient Air Quality Standards (NAAQS) for PM 2.5 . EPA is approving these revisions in...

  15. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air...

  16. 76 FR 10295 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control...

    Science.gov (United States)

    2011-02-24

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control Volatile Organic Compound Emissions From Consumer Related Sources AGENCY: Environmental Protection..., Control of Air Pollution from Volatile Organic Compounds. The State submitted these revisions on March 4...

  17. 77 FR 67322 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-11-09

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... authority to address disproportionate human health or environmental effects with practical, appropriate,...

  18. 78 FR 896 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-01-07

    ... is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  19. 76 FR 60405 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Sacramento Municipal Air Quality Management District and South Coast Air Quality... proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD),...

  20. 75 FR 56942 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Diego Air Pollution Control District...

  1. 78 FR 37176 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of...

  2. 78 FR 53249 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-08-29

    ... finalizing approval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air...

  3. 78 FR 6784 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of...

  4. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-01-19

    ... finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control...) * * * (i) * * * (D) Placer County Air Pollution Control District (1) Rule 233, ``Biomass Boilers,'' amended... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air...

  5. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  6. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  7. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... taking direct final action to approve revisions to the Antelope Valley Air Quality Management District... Valley Air Quality Management District (AVAQMD) and submitted by the California Air Resources Board (CARB... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  8. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-13

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  9. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Feather River Air...

  10. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District portion of the...

  11. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  12. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  13. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  14. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  15. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion...

  16. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-10-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  17. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of...

  18. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the South Coast Air Quality...

  19. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  20. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  1. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  2. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  3. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-11-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  4. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  5. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-01-25

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  6. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... AGENCY 40 CFR Part 52 Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing disapproval of a revision to the South Coast Air Quality Management District (SCAQMD) portion...

  7. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  8. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  9. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-06-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  10. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-05-23

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  11. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  12. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  13. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air...

  14. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... taking direct final action to approve revisions to the Mojave Desert Air Quality Management District... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air...

  15. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  16. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  17. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  18. 77 FR 22676 - Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District

    Science.gov (United States)

    2012-04-17

    ... AGENCY 40 CFR Part 52 Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited approval and limited disapproval of a revision to the Pinal County Air Quality...

  19. 77 FR 7536 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-02-13

    ... is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Joaquin Valley Unified...

  20. 76 FR 6331 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Colorado; Revision...

    Science.gov (United States)

    2011-02-04

    ... recordkeeping format (collectively, ``O&M plan''). In its place, the revision would require the owner or operator to submit the O&M plan before final permit approval. In this section EPA responds to the comment... version of the O&M plan is dependent on conditions of the issued permit and on performance testing after...

  1. 76 FR 71922 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality...

  2. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  3. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP)....

  4. Antelope Valley Air Quality Management District; Approval of California Air Plan Revisions

    Science.gov (United States)

    EPA is proposing to approve and conditionally approve revisions to the Antelope Valley Air Quality Management District (AVAQMD or “District”) portion of the California State Implementation Plan (SIP).

  5. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management...

  6. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-06

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District... State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District's Rule 4352,...

  7. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  8. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  9. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan... Principles for Institutions of Higher Education, OMB Circular A-122—Cost Principles for...

  10. 38 CFR 49.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression...

  11. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project...

  12. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project...

  13. 40 CFR 30.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial.... (iii) The applicant incurs such costs at its own risk (i.e., EPA is under no obligation to reimburse... procurement complies with the requirements of this rule. (2) Extend the expiration date of the award one...

  14. Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.

    Science.gov (United States)

    Charles G. Shaw

    1999-01-01

    This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...

  15. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... costs, or vice versa, approval is required by the Department. (6) The inclusion, unless waived by...

  16. 32 CFR 32.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 32.25 Revision of budget and program plans. (a) The budget plan is the financial expression of... case must be stated in the award document. (6) The inclusion, unless waived by the DoD Component,...

  17. 22 CFR 226.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the... inclusion, unless waived in the agreement by USAID, of costs that require prior approval in accordance...

  18. 45 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...) The need for additional Federal funding. (5) The inclusion, unless waived by the HHS awarding...

  19. 36 CFR 1210.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 1210.25 Revision of budget and program plans. (a) The budget plan is the financial..., if approval is required by the NHPRC. (6) The inclusion, unless waived by the NHPRC, of costs...

  20. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Science.gov (United States)

    2010-05-26

    ... NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear... public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for... revision of NUREG-0800, SRP Section 13.6.6 and Regulatory Guide 1.206, ``Combined License Applications...

  1. 76 FR 62002 - Revisions to the California State Implementation Plan

    Science.gov (United States)

    2011-10-06

    ... ``anonymous access'' system, and EPA will not know your identity or contact information unless you provide it... Measure (SCM) titled, ``Suggested Control Measure for Automotive Coatings.'' SJVUAPCD Rule 4653 is revised... 21, 2001 (the Little Bluebook). 4. CARB's Suggested Control Measure (SCM) titled, ``Suggested...

  2. Selawik National Wildlife Refuge: Revised Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Selawik NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  3. Revised Comprehensive Conservation Plan for the Tetlin National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Tetlin NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  4. Revised Comprehensive Conservation Plan for the Kanuti National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Kanuti NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  5. National Ignition Facility project acquisition plan revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  6. Revised Comprehensive Conservation Plan for the Innoko National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Innoko NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  7. Alabama Cavefish Recovery Plan, Second Revision, October 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Recovery plans delineate reasonable actions which are believed to be required to recover and/or protect the listed species. Plans are prepared by the U.S. Fish and...

  8. Dare To Dream: A Guide to Planning Your Future. Revised.

    Science.gov (United States)

    Webb, Kristine; Repetto, Jeanne; Beutel, Adory; Perkins, Dollean; Bailey, Mary; Schwartz, Stuart

    This workbook is intended to help students with disabilities plan their postschool futures. In addition to the general material, "Dare To Know" boxes highlight important information, while "Dare To Think" and "Dare To Do" boxes provide activities to help with planning. Individual sections focus on topics such as the following: planning my…

  9. Revised

    DEFF Research Database (Denmark)

    Johannsen, Vivian Kvist; Nord-Larsen, Thomas; Riis-Nielsen, Torben;

    This report is a revised analysis of the Danish data on CO2 emissions from forest, afforestation and deforestation for the period 1990 - 2008 and a prognosis for the period until 2020. Revision have included measurements from 2009 in the estimations. The report is funded by the Ministry of Climate...

  10. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  11. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  12. The State University System 2025 System Strategic Plan. Revised

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System 2025 Strategic Plan strengthens the Board of Governors' commitment to achieving excellence in the tripartite mission of its state universities--teaching, research, and public service--for the benefit of Florida's citizens, their communities, and the state economy. The Strategic Plan is a living document that helps align…

  13. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  14. Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

  15. Arctic National Wildlife Refuge: Revised Comprehensive Conservation Plan, Final Environmental Impact Statement, Wilderness Review, and Wild and Scenic River Review

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Arctic NWR for the next 15 years. It is a revision of the 1988 plan, and it describes...

  16. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  17. 25 CFR 290.26 - Are previously approved tribal revenue allocation plans, revisions, or amendments subject to...

    Science.gov (United States)

    2010-04-01

    ... § 290.26 Are previously approved tribal revenue allocation plans, revisions, or amendments subject to... 25 Indians 1 2010-04-01 2010-04-01 false Are previously approved tribal revenue allocation plans, revisions, or amendments subject to review in accordance with this part? 290.26 Section 290.26...

  18. 76 FR 31381 - Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

    Science.gov (United States)

    2011-05-31

    ... Analysis Reports for Nuclear Power Plants,'' on a proposed Revision 4 to Standard Review Plan (SRP... Position (BTP) 8-8 on ``Onsite (Emergency Diesel Generators) and Offsite Power Sources Allowed Outage Time... COMMISSION Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

  19. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  20. 75 FR 27838 - Notice of Availability of Draft NUREG-1800, Revision 2; “Standard Review Plan for Review of...

    Science.gov (United States)

    2010-05-18

    ... NUREG-1800, Revision 2; ``Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants'' and Draft NUREG-1801, Revision 2; ``Generic Aging Lessons Learned (GALL) Report'' AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Issuance of draft NUREG-1800, ``Standard Review Plan...

  1. 78 FR 22556 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for Lost River Sucker and...

    Science.gov (United States)

    2013-04-16

    ... of the same threats continue, such that both species remain in danger of extinction. Habitat loss... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for Lost... the Federal List of Endangered and Threatened Wildlife and Plants. We revised this plan because a...

  2. Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Cook, James R.

    2005-12-07

    Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06.

  3. 75 FR 15391 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to Control...

    Science.gov (United States)

    2010-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to... tanks, transport vessels and marine vessels in the Houston/Galveston/Brazoria (HGB) 1997 8-hour ozone..., transport vessels, and marine vessels located in the HGB 1997 8-hour ozone nonattainment area to more...

  4. 75 FR 15348 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To Control...

    Science.gov (United States)

    2010-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To... tanks, transport vessels and marine vessels in the Houston/Galveston/Brazoria (HGB) 1997 8-hour ozone... vessels, and marine vessels located in the HGB 1997 8-hour ozone nonattainment area to more stringent...

  5. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... Bureau of Land Management Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice... amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management...

  6. 12 CFR 702.306 - Revised business plans for new credit unions.

    Science.gov (United States)

    2010-01-01

    ... exposure to risk (including credit risk, interest-rate risk, and other types of risk). (d) Consideration of... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Revised business plans for new credit unions. 702.306 Section 702.306 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING...

  7. 78 FR 78315 - Revision to the Idaho State Implementation Plan; Approval of Fine Particulate Matter Control...

    Science.gov (United States)

    2013-12-26

    ... AGENCY 40 CFR Part 52 Revision to the Idaho State Implementation Plan; Approval of Fine Particulate... particulate matter (PM 2.5 ) nonattainment area (Logan UT-ID). The EPA is proposing a limited approval of PM 2..., the disclosure of which is restricted by statute. Certain other material, such as copyrighted...

  8. 78 FR 12267 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-02-22

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD...

  9. 76 FR 10249 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control...

    Science.gov (United States)

    2011-02-24

    ... pollution regulations and control strategies to ensure that air quality meets the National Ambient Air... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control Volatile Organic Compound Emissions From Consumer Related Sources AGENCY: Environmental Protection...

  10. 76 FR 37141 - Notice of Availability for Comment: Draft Recovery Plan, First Revision; Mexican Spotted Owl

    Science.gov (United States)

    2011-06-24

    ...; Mexican Spotted Owl AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; request... recovery plan, first revision, for the Mexican Spotted Owl (Strix occidentalis lucida) under the Endangered... will also accept any new information on the status of the Mexican spotted owl throughout its range...

  11. 75 FR 11508 - Revision of Land Management Plan for the Uwharrie National Forest

    Science.gov (United States)

    2010-03-11

    ... Environmental Impact Statement. SUMMARY: As directed by the National Forest Management Act, the USDA Forest... also prepare an Environmental Impact Statement (EIS) for this revised forest plan. This notice briefly... river frontage, rolling topography, and facilities, is currently ] providing a variety of these desired...

  12. 76 FR 68103 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-03

    ... Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... Rulemaking For the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control...

  13. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Science.gov (United States)

    2011-03-29

    ...) * * * (D) Great Basin Unified Air Pollution Control District (1) Rule 201, ``Exemptions,'' adopted on... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec....

  14. 76 FR 30080 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency... Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion...

  15. 76 FR 38349 - Plan Revision for Colville, and the Okanogan-Wenatchee National Forests, Washington (Collectively...

    Science.gov (United States)

    2011-06-30

    ... invasive species. These amended plans will remain in effect until the revision takes effect. The Okanogan..., and root diseases. All of these changes have led to reductions in habitat for some species and... relating to plant and animal species and their habitats. The habitat goals and objectives of the...

  16. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  17. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  18. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-01-12

    ... action, we are proposing to approve South Coast Air Quality Management District (SCAQMD) Rule 317.... South Coast Air Quality Management District There are two 1-hour ozone nonattainment areas within the... Quality Management Plan, as revised in 1999.\\9\\ The approved 1-hour ozone SIP in the Southeast...

  19. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  20. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  1. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... River Air Quality Management District. (1) Rule 3.22, ``Internal Combustion Engines,'' adopted on June... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  2. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution... AGENCY 40 CFR Part 52 Revisions to California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  3. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  4. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... the Antelope Valley Air Quality Management District (AVAQMD) and Mojave Desert Air Quality...

  5. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions...

  6. 78 FR 4804 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-01-23

    ... AGENCY 40 CFR Part 52 Revision to the Washington State Implementation Plan; Tacoma- Pierce County... (CAA) requirements related to the Tacoma-Pierce County nonattainment area for the 2006 fine particulate... Tacoma-Pierce County Clean Air Task Force, an advisory committee of community leaders, citizen...

  7. 78 FR 35181 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Revisions to Utah...

    Science.gov (United States)

    2013-06-12

    ... revisions contain new, amended and renumbered rules in Utah Administrative Code (UAC) Title R-307 that... Utah Administrative Code--Permit: New and Modified Sources AGENCY: Environmental Protection Agency (EPA... Implementation Plan. (vii) The initials UAC mean or refer to the Utah Administrative Code. I. General...

  8. 9 CFR 108.6 - Revision of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ..., and legends. 108.6 Section 108.6 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION... FACILITY REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.6 Revision of plot plans, blueprints, and legends..., blueprints, or legends and submit to Animal and Plant Health Inspection Service for review and filing...

  9. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution Control District... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial Valley Air Pollution Control District AGENCY: Environmental Protection...

  10. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas Turbines... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality...

  11. 75 FR 8493 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the...

    Science.gov (United States)

    2010-02-25

    ... in the public docket and made available on the Internet. If you submit an electronic comment, EPA... to the Definition of Volatile Organic Compound and Other Terms AGENCY: Environmental Protection... to the Virginia State Implementation Plan (SIP). The revisions amend the wording of 22...

  12. 75 FR 27975 - Revisions to the California State Implementation Plan; Imperial County Air Pollution Control...

    Science.gov (United States)

    2010-05-19

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan...

  13. 76 FR 7142 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-02-09

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... pollution sources. We are taking comments on this proposal and plan to follow with a final action....

  14. 77 FR 25109 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2012-04-27

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD...). We are taking comments on this proposal and plan to follow with a final action. DATES: Any...

  15. 77 FR 47536 - Revisions to the California State Implementation Plan, Mojave Desert, Northern Sierra, Sacramento...

    Science.gov (United States)

    2012-08-09

    ... Desert Air Quality Management District. (1) Rule 1116, ``Automotive Refinishing Operations,'' amended on... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert, Northern... to the Mojave Desert Air Quality Management District (MDAQMD), Northern Sierra ] Air Quality...

  16. 78 FR 34112 - Review and Revision of the National Infrastructure Protection Plan

    Science.gov (United States)

    2013-06-06

    ... infrastructure partners and other stakeholders. This notice extends an invitation to the public to provide... SECURITY Review and Revision of the National Infrastructure Protection Plan AGENCY: National Protection and Programs Directorate, DHS. ACTION: Notice and request for comments. SUMMARY: This notice informs the...

  17. 78 FR 57503 - Revision to the Washington State Implementation Plan; Approval of Motor Vehicle Emission Budgets...

    Science.gov (United States)

    2013-09-19

    ... AGENCY 40 CFR Part 52 Revision to the Washington State Implementation Plan; Approval of Motor Vehicle Emission Budgets and Determination of Attainment for the 2006 24-Hour Fine Particulate Standard; Tacoma... November 28, 2012, to establish motor vehicle emission budgets for the Tacoma-Pierce County...

  18. 76 FR 68638 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Science.gov (United States)

    2011-11-07

    ... Nitrogen Oxides Budget Trading Program AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Implementation Plan (SIP). The revision pertains to regulatory language in its nitrogen oxides (NO X ) Budget..., Nitrogen dioxide, Ozone, Sulfur oxides. Dated: October 25, 2011. W.C. Early, Acting Regional...

  19. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on...

  20. 77 FR 14414 - Notice of Intent To Revise Resource Management Plans and an Associated Environmental Impact...

    Science.gov (United States)

    2012-03-09

    ... involved in the planning process: Timber, wildlife and fisheries, economics, botany, climate change/carbon... Environmental Impact Statement for Six Western Oregon Districts of the Bureau of Land Management AGENCY: Bureau..., the Bureau of Land Management (BLM) Oregon State Office, Portland, Oregon, intends to revise...

  1. Corrective measures evaluation work plan : Tijeras Arroyo Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Wymore, Ryan A.; Collins, Sue S.; Skelly, Michael Francis; Koelsch, Michael C.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories Tijeras Arroyo Groundwater (TAG). The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for TAG. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  2. Fission product plateout/liftoff/washoff test plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Acharya, R.; Hanson, D.

    1988-05-01

    A test program is planned in the COMEDIE loop of the Commissariat a l`Energy Atomique (CEA), Grenoble, France, to generate integral test data for the validation of computer codes used to predict fission product transport and core corrosion in the Modular High Temperature Gas-Cooled Reactor (MHTGR). The inpile testing will be performed by the CEA under contract from the US Department of Energy (DOE); the contract will be administered by Oak Ridge National Laboratory (ORNL). The primary purpose of this test plan is to provide an overview of the proposed program in terms of the overall scope and schedule. 8 refs, 3 figs.

  3. ITS strategic test plan : revision 1.0.

    Energy Technology Data Exchange (ETDEWEB)

    Franke, Brian Claude; Lorence, Leonard Joseph, Jr.; Crawford, Martin James (K-Tech Corporation, Albuquerque, NM); Cordova, Lisa A.; Kensek, Ronald Patrick; Laub, Thomas William

    2004-07-01

    This test plan describes the testing strategy for the ITS (Integrated-TIGER-Series) suite of codes. The processes and procedures for performing both verification and validation tests are described. ITS Version 5.0 was developed under the NNSA's ASC program and supports Sandia's stockpile stewardship mission.

  4. Revised plans for Hot Dry Rock geothermal program

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, Hugh D. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    1987-03-10

    This letter is our response to your February 13 letter directing us to respond to Headquarters' request for new HDR program plans. This request was initiated by John E. Mock, CE-342, HQ. Our response is organized as three attachments.

  5. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  6. National Ignition Facility Risk Management Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Brereton, S J

    2002-06-01

    The National Ignition Facility (NIF) Risk Management Plan (LLNL, 1997a) was originally prepared in 1997 in accordance with the Department of Energy (DOE) Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported NIF Critical Decision 3, approval to initiate construction (DOE, 1997a). The plan was updated in 1998 to reflect realized risks such as the finding and successful clean up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF excavation during initial construction and the litigation of the Programmatic Environmental Impact Statement for Stockpile Stewardship (DOE, 1996b) by a group of non-governmental organizations led by the Natural Resources Defense Council. The current update of the Risk Management Plan brings it into compliance with the applicable DOE Orders and Standards and addresses new risks, such as assuring safety during the period when construction, special equipment installation, and commissioning are occurring simultaneously at the NIF site, and the extensive use of models to manage technical performance risk. The objectives of the updated plan are to: (1) Identify the risks to the completion of the Project in terms of meeting performance and regulatory requirements, ES&H, cost, and schedule; (2) Assess or the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H, costs, and schedule; and (3) Address suitable risk mitigation measures for each identified risk.

  7. 242-A evaporator quality assurance project plan: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, B.J.

    1994-11-04

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal.

  8. 76 FR 64372 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan, First Revision, for...

    Science.gov (United States)

    2011-10-18

    ... shoreline habitats. Both species spawn during spring, over gravel bottoms in tributary streams and rivers... also spawn over gravel bottoms at shoreline springs along the margins of Upper Klamath Lake (Janney et... actions and priorities in the plan's Implementation Schedule reflect a biologically sound...

  9. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  10. National Ignition Facility quality assurance program plan revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  11. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  12. Planning Civilian Reuse of Former Military Base. Revision

    Science.gov (United States)

    1990-08-01

    Boston Shipyard - 1979 (553) Immobiliare Ltd . Boston National Planning & Development and John Charlestown (c) Historic Park. Sail Magazine. O’Brien, Navy...Production, Crowder College. Commerce, Neosho. MO 64850 Municipal Airport (417) 451-1925 Conrad, Montana 1972 153 50 Cascade Campers Ltd ...South Carolina 1963 672 5,253 Woolworth Distribution Center. 3M 500(C) Phillip Southerland, Executive Donaldson Air Force Base 1964 (4.100) Company

  13. Motion Planning with Six Degrees of Freedom. Revision

    Science.gov (United States)

    1984-05-01

    Lab. In particular, thanks for the private VAX and Lisp Machine I required for the implementation. Michael Erdmann, John Canny, and Steve Buckley...atlas U), or a coordinate system for U. For a good introduction to differential geometry, see, for example, ( Spivak , 1979). In this thesis we usually...Scicnce, Stanford University, 1979. Frdrnanii, Michael On Motion Planning with Uncertainty, Department of NElc(tri,:al Engineering and Computer Science

  14. Planning for an Individual Water System. Fourth Edition Revised.

    Science.gov (United States)

    Turner, J. Howard, Ed.

    Few investments have as little thought given to planning as the installation of a water-supply system for the home or farm. There are many considerations to be made if an adequate supply of water is to be available for the living and recreational needs of a family or the needs of livestock. This book is designed to instruct the reader on how to…

  15. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  16. Waste minimization and pollution prevention awareness plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    Smith, G.; Hall, R.L.

    1991-05-03

    The purpose of this plan is to establish the Pinellas Plant Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that will be employed to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy the Department of Energy (DOE) and other legal requirements that are discussed in Section 1.3. A Waste Minimization Program is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Waste Minimization and Pollution Prevention Awareness Program is designed to eliminate or minimize pollutant releases to all environmental media from all aspects of the site`s operations. These efforts offer increased protection of public health and the environment. Sections of this report describe: Background; Resources; Policy; Strategy, objectives, and goals; Organization and staff responsibilities; Cost accounting; Waste assessments; Waste minimization techniques; Training, awareness, and incentives; Tracking and reporting systems; Quality assurance; Information exchange and outreach; Technology transfer; Research and development; and Program evaluation.

  17. Human Research Program Integrated Research Plan. Revision C

    Science.gov (United States)

    Steinberg, Susan

    2011-01-01

    Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  18. Tank waste remediation system integrated technology plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P. [eds.] [Pacific Northwest Lab., Richland, WA (United States)

    1995-02-28

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m{sup 3} (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program.

  19. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5.

  20. NIF Project Quality Assurance Program Plan Revision E

    Energy Technology Data Exchange (ETDEWEB)

    Dun, C; Brereton, S; Yatabe, J; Moses, E I

    2001-06-01

    The National Ignition Facility (NIF) is a key constituent of the Department Energy's (DOE's) Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets and will perform weapons physics, weapons effects, and high-energy-density experiments in support of national security and civilian objectives. The primary mission of the NIF Project is the design and construction of the facility and equipment, acceptance testing, and activation. To accomplish this mission, the LLNL Director created the NIF Programs Directorate, and within that Directorate, the NIF Project Office to organize and manage the Project. The NIF Project Office establishes this QA Program to ensure its success. This QA Program Plan (QAPP) defines and describes the program--the management system--for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of LLNL and the NIF Programs Directorate.

  1. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  2. OCRWM Systems Engineering Management Plan (SEMP). Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.

  3. Self-assessment program implementation plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  4. Double-shell tank ultrasonic inspection plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Pfluger, D.C.

    1994-09-30

    The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws.

  5. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  6. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included.

  7. 105-DR Large Sodium Fire Facility closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, and activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950`s and is located in the 100-D Area of the Hanford Site. The building housed the 105-DR defense reactor, which was shut down in 1964. The LSFF was initially used only for engineering-scale alkali metal reaction studies. In addition, the Fusion Safety Support Studies program sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium lead compounds. The facility has also been used to store and treat alkali metal waste, therefore the LSFF is subject to the regulatory requirements for the storage and treatment of dangerous waste. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610. This closure plan presents a description of the facility, the history of waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  8. 303-K Storage Facility closure plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  9. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District (Yolo.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  10. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District portion of the...

  11. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... proposing to approve a revision to the Yolo-Solano Air Quality Management District portion of the California... local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable Polystyrene Manufacturing... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  12. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-04-16

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  13. 75 FR 37308 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-06-29

    ... finalizing approval of revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the...) * * * (i) * * * (C) Yolo Solano Air Quality Management District (1) Rule 3.21, ``Rice Straw Emission... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  14. 75 FR 80857 - Notice of Availability of NUREG-1800, Revision 2; “Standard Review Plan for Review of License...

    Science.gov (United States)

    2010-12-23

    ... COMMISSION Notice of Availability of NUREG-1800, Revision 2; ``Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants'' and NUREG-1801, Revision 2; ``Generic Aging Lessons Learned (GALL) Report'' AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Issuance of...

  15. 75 FR 11107 - Revision of Land Management Plan for the George Washington National Forest, Virginia and West...

    Science.gov (United States)

    2010-03-10

    ... briefly describes the applicable planning rule and how work done on the plan revision under the 2008... conditions, environmental stresses and threats, societal demands and our current state of scientific... employees. This will improve efficiency in plan implementation and monitoring and in responding to regional...

  16. 78 FR 21302 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Science.gov (United States)

    2013-04-10

    ... Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact... other things, the Phase 1 and Phase 2 Rules outline the SIP requirements and deadlines for various... removal of a definition, the addition of several new definitions, and revisions to the RACT...

  17. 75 FR 45483 - Approval and Promulgation of Implementation Plans; Implementation Plan Revision; State of New Jersey

    Science.gov (United States)

    2010-08-03

    ... act on the phased compliance plans by repowering and innovative control in sections 19.21 and 19.23... compliance plan through repowering in Sec. from Oxides of Nitrogen.'' Register page Sec. 19.21 that...

  18. Digital Problems and Strategies of Partial Revision in Overall Plan of Land Use

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The technical route of partial revision in overall plan of land use is briefly described.It is pointed out that problems of area measuring in the technical route are mainly due to the digital process.The digital problems of partial revision in overall plan of land use are presented as follows:the maps are not proofread before digitalization;the coordinate matching and projection transformation are not conducted on the maps;the information is asymmetrical pre and post the digitalization;the location lacks precision;the result maps are substandard.The causes of these problems are analyzed,which cover the following aspects.The lack of united management regulations;uneven working abilities of the staff in the compilation units;unawareness of the importance of map digilalization;poor basic conclitions of the original plan maps.At last,the relevant suggestions are put forward,for instance,releasing the national united management methods and technical criteria,establishing industrial admittance system and qualification system of complication units,setting up the mechanism of supervising digitalized results and controlling the quality,conducting coordinate matching and projection transformation and unifying the specification and mode of the results of maps so as to provide technical support for the overall plan of land use,play the micro-regulating role of land use and take a leading role in the sustainable development of social economy.

  19. Children's high-level writing skills: development of planning and revising and their contribution to writing quality.

    Science.gov (United States)

    Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel

    2014-06-01

    It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.

  20. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  1. 76 FR 38575 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Northern Spotted Owl...

    Science.gov (United States)

    2011-07-01

    ... Recovery Plan for the Northern Spotted Owl (Strix occidentalis caurina) AGENCY: Fish and Wildlife Service... Wildlife Service, announce the availability of the Revised Recovery Plan for the Northern Spotted Owl... Spotted Owl available for public review and comment from September 15 through November 15, 2010...

  2. 77 FR 24975 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog

    Science.gov (United States)

    2012-04-26

    ... Utah Prairie Dog AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... preparation of the final revised recovery plan for the Utah prairie dog. The Service and other...

  3. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  4. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-06-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  5. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2012-10-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  6. 75 FR 56923 - Approval and Promulgation of Implementation Plans; Oklahoma; State Implementation Plan Revisions...

    Science.gov (United States)

    2010-09-17

    ... appropriate, disproportionate human health or environmental effects, using practicable and legally permissible... in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations... hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue,...

  7. 75 FR 29897 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Science.gov (United States)

    2010-05-28

    .... What is the history and time frame for State Implementation Plan (SIP) submissions? II. What was... is EPA's conclusion? V. Statutory and Executive Order Reviews I. What is the history and time frame... Container Spillage Control.'' The intended effect of this action is to approve control strategies,...

  8. Effects of the Original Versus Revised Bloom's Taxonomy on Lesson Planning Skills: A Turkish Study Among Pre-Service Teachers

    Science.gov (United States)

    Bümen, Nilay T.

    2007-07-01

    The original taxonomy of educational objectives, developed by Benjamin S.␣Bloom and his associates in the 1950s, was revised several decades later by a group of educationists and cognitive psychologists, who developed a revised taxonomy (RT). This article describes a Turkish study carried out among a group of pre-service teachers in order to compare the influence of the two systems on lesson planning skills. The results confirmed other studies that have indicated a number of advantages of the revised system over the earlier one.

  9. 78 FR 9016 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Revisions to Fossil...

    Science.gov (United States)

    2013-02-07

    ...; Revisions to Fossil Fuel Utilization and Source Registration Regulations and Boiler Industrial Standards... revisions add new monitoring, inspection, maintenance and testing requirements for certain fossil fuel... approval of the state's revised fossil fuel utilization facility regulation, source registration...

  10. Survey of ANL organization plans for word processors, personal computers, workstations, and associated software. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Fenske, K.R.; Rockwell, V.S.

    1992-08-01

    The Computing and Telecommunications Division (CTD) has compiled this Survey of ANL Organization plans for Word Processors, Personal Computers, Workstations, and Associated Software (ANL/TM, Revision 4) to provide DOE and Argonne with a record of recent growth in the acquisition and use of personal computers, microcomputers, and word processors at ANL. Laboratory planners, service providers, and people involved in office automation may find the Survey useful. It is for internal use only, and any unauthorized use is prohibited. Readers of the Survey should use it as a reference document that (1) documents the plans of each organization for office automation, (2) identifies appropriate planners and other contact people in those organizations and (3) encourages the sharing of this information among those people making plans for organizations and decisions about office automation. The Survey supplements information in both the ANL Statement of Site Strategy for Computing Workstations (ANL/TM 458) and the ANL Site Response for the DOE Information Technology Resources Long-Range Plan (ANL/TM 466).

  11. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  12. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  13. Three-dimensional printing for preoperative planning of total hip arthroplasty revision: case report.

    Science.gov (United States)

    Zerr, Joseph; Chatzinoff, Yonatan; Chopra, Rajiv; Estrera, Kenneth; Chhabra, Avneesh

    2016-10-01

    Three dimensional (3D) printing can be used to create material models to aid preoperative planning of complex orthopedic procedures as exemplified by this case of total hip arthroplasty failure due to infection with resulting severe acetabular bone stock deficiency. The 3D model allowed for trialing of the acetabular component to determine cup size, position, and screw placement. Most importantly, the model confirmed that there was not a pelvic discontinuity and the revision shell would be sufficient for the reconstruction. Previously, the cost and complexity of utilization of 3D printers were prohibitive. Recent improvements in commercially available 3D printers have made rapid prototype model creation a realistic option, which can facilitate difficult surgery.

  14. Bioconversion of plant biomass to ethanol. Annual report and revised research plan, January 1977--January 1978

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, R.E.; Bellamy, W.D.; Su, T.M.

    1978-03-23

    The objective of this research is to demonstrate on a laboratory scale the technical feasibility of the direct microbial conversion of pretreated wood to ethanol. During the first year of this contract, we investigated the feasibility of biologically delignifying wood with C. pruinosum and directly fermenting the pretreated wood to ethanol with a mixed culture. Bench-top fermentations of a thermophilic bacillus growing on glucose and of a mixed culture of thermophilic sporocytophaga (US) and a thermophilic bacillus growing on microcrystalline and amorphous cellulose were evaluated for growth and ethanol production. In the mixed culture fermentation of amorphous and microcrystalline cellulose, the specific rate of substrate depletion was calculated to be 0.087 hr/sup -1/ and 0.0346 hr/sup -1/, respectively. However, defining the growth requirements of C. pruinosum and sporocytophaga (US) proved more difficult than originally anticipated. In order to achieve the program objectives within the contract period, a revised research plan was developed based upon chemical pretreatment and the direct fermentation of pretreated hardwood to ethanol. In place of the biological delignification pretreatment step, we have substituted a chemically supplemented steam pretreatment step to partially delignify wood and to enhance its accessibility to microbial utilization. Clostridium thermocellum, which ferments cellulose directly to ethanol and acetic acid, has replaced the mixed culture fermentation stage for ethanol production. Research on the production of ethanol from xylose by the thermophilic bacillus ZB-B2 is retained as one means of utilizing the hemicellulose fraction of hardwood. Work on the genetic improvement of the ethanol yields of both cultures by suppressing acetic acid production is also retained. The rationale, experimental approach, and economic considerations of this revised research plan are also presented.

  15. 78 FR 47241 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the...

    Science.gov (United States)

    2013-08-05

    ... COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the Human Health Water Quality Criteria for PCBs in Zones 2 Through 6 of the Delaware Estuary and... comments on proposed amendments to the Commission's Water Quality Regulations, Water Code and Comprehensive...

  16. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Science.gov (United States)

    2010-09-17

    ... for Utah Prairie Dog AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of a draft revised recovery plan for the Utah prairie dog (Cynomys parvidens). This species is.... The Utah prairie dog (Cynomys parvidens), found only in southwestern and central Utah, was listed...

  17. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... taking direct final action to approve a revision to the Yolo-Solano Air Quality Management District... did the State submit? We are approving Yolo-Solano Air Quality Management District (YSAQMD) Rule 2.41... Identification of plan. * * * * * (c) * * * (364) * * * (i) * * * (C) Yolo-Solano Air Quality Management...

  18. 75 FR 41311 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Science.gov (United States)

    2010-07-15

    ... Coalition, Robertson County: Our Land, Our Lives, Texas Protecting Our Land, Water and Environment, Citizens... quality in Texas by producing data showing that any such gains are directly attributable to the submitted... Protection Agency 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Revisions to...

  19. 75 FR 4340 - Plan Revision for the Coronado National Forest, Cochise, Graham, Pima, Pinal, and Santa Cruz...

    Science.gov (United States)

    2010-01-27

    ... updated language. Provide direction to guide future vegetation management activities, including burning... management direction for fire, caves, cultural resources, roads, and trails, and adding direction for the... Web site, http://www.fs.fed.us/r3/coronado/plan-revision/index.shtmi . Individuals who...

  20. 76 FR 71260 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Science.gov (United States)

    2011-11-17

    ... permitting under Title 30 of the Texas Administrative Code (30 TAC), Chapter 116--Control of Air Pollution by...: Our Land, Our Lives; Texas Protecting Our Land, Water, and Environment; Citizens for a Clean... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Revisions to the...

  1. 76 FR 2294 - Revision to the South Coast Portion of the California State Implementation Plan, CPV Sentinel...

    Science.gov (United States)

    2011-01-13

    ... source-specific State Implementation Plan (SIP) revision for the South Coast Air Quality Management..., in relevant part, is: The Executive Officer of the South Coast Air Quality Management District shall... Tracking System meet all Federal requirements. In addition, the District supplied a copy of its air...

  2. 77 FR 30335 - Proposed Revision 3 to Standard Review Plan, Section 19.1 on Determining the Technical Adequacy...

    Science.gov (United States)

    2012-05-22

    ... Probabilistic Risk Assessment for Risk-Informed License Amendment Requests After Initial Fuel Load AGENCY... of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' on a proposed Revision 3 to Standard Review Plan (SRP), Section 19.1, ``Determining the Technical Adequacy of Probabilistic...

  3. 78 FR 21537 - Revisions to the California State Implementation Plan, Santa Barbara and San Diego County Air...

    Science.gov (United States)

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara and San Diego... Air Pollution Control District (SBCAPCD) and San Diego County Air Pollution Control District (SDCAPCD...

  4. 78 FR 21580 - Revisions to the California State Implementation Plan, Santa Barbara and San Diego County Air...

    Science.gov (United States)

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara and San Diego... District (SBCAPCD) and San Diego County Air Pollution Control District (SDCAPCD) portions of the California...

  5. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G.J. [Dept. of Energy, Washington, DC (United States); Williams, R.E.; Kudera, D.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Bailey, D.E. [NJG, Inc. (United States)

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  6. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2011-11-01

    ...). These revisions concern oxides of nitrogen (NO X ) emissions from industrial, institutional and... Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and...

  7. 78 FR 29096 - Approval and Promulgation of Implementation Plans; Tennessee; Transportation Conformity Revisions

    Science.gov (United States)

    2013-05-17

    ... Conformity Revisions AGENCY: Environmental Protection Agency. ACTION: Proposed rule. SUMMARY: EPA is... Control Division, on July 12, 2012. This revision consists of updates to transportation conformity...-related control and mitigation measures. The intended effect is to update the transportation...

  8. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-07-13

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site`s preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised.

  9. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  10. 75 FR 9834 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions...

    Science.gov (United States)

    2010-03-04

    ..., installing ductwork, and other infrastructure and/or excavation work involving the same. No construction or... revisions contain new, amended, and repealed rules in Subchapter 7 (Permit, Construction, and Operation of... Subchapter 7 (Permit, Construction, and Operation of Air Contaminant Sources), the submittal revised ARM 17.8...

  11. 76 FR 52275 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to Clean Air...

    Science.gov (United States)

    2011-08-22

    ... to Clean Air Interstate Rule Emissions Trading Program AGENCY: Environmental Protection Agency (EPA... Commonwealth of Virginia. The revision, which amends the Virginia Clean Air Interstate Rule (CAIR) trading program, is comprised of technical corrections and revisions to the definition of a cogeneration unit to...

  12. 76 FR 44265 - Approval and Disapproval and Promulgation of State Implementation Plan Revisions; Infrastructure...

    Science.gov (United States)

    2011-07-25

    ... Ozone (Clean Air Interstate Rule); Revisions to Acid Rain Program; Revisions to the NO X SIP Call; Final... indicator species for the new NAAQS. Similarly, EPA notes that other types of SIP submissions required under... infrastructure SIP, EPA believes that section 110(a)(2)(A) may be among the statutory bases that the Agency...

  13. 76 FR 63251 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Science.gov (United States)

    2011-10-12

    ... annual NO X budget to account for an erroneously assumed selective catalytic reduction (SCR) emission... erroneously assumed SCR emission control device at one unit; (3) revise an error in the Texas SO 2 budget to... to account for an erroneously assumed FGD and SCR device at two units, and (8) revise New...

  14. 77 FR 24441 - Approval and Promulgation of Implementation Plans; California; Revisions to the California State...

    Science.gov (United States)

    2012-04-24

    ... Ninth Circuit Court of Appeals of EPA's 2009 approval of a revision to the California SIP related to..., the 9th Circuit Court of Appeals remanded the approval of PEST-1 to EPA with the instructions...

  15. 75 FR 4036 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2010-01-26

    ... Administrative Rules of Montana. Revisions include minor editorial and grammatical changes, updates to the citations and references to federal and state laws and regulations, other minor changes to conform...

  16. 76 FR 33181 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-06-08

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the San Joaquin Valley Unified Air Pollution Control..., Air pollution control, Intergovernmental relations, Ozone, Reporting and recordkeeping requirements...

  17. 76 FR 56706 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-14

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... Environmental protection, Air pollution control, Intergovernmental relations, Ozone, Reporting and recordkeeping...

  18. 75 FR 13468 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-03-22

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to disapprove a revision to the Monterey Bay Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen...

  19. 76 FR 68106 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-03

    ... Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference...

  20. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality Management District (SMAQMD), and South Coast Air Quality Management District......

  1. 78 FR 29027 - Approval and Promulgation of Implementation Plans; Tennessee; Transportation Conformity Revisions

    Science.gov (United States)

    2013-05-17

    ... Conformity Revisions AGENCY: Environmental Protection Agency. ACTION: Direct final rule. SUMMARY: EPA is... transportation conformity criteria and procedures related to interagency consultation and enforceability of... the transportation conformity criteria and procedures in the Tennessee SIP. This action is being...

  2. 78 FR 48504 - Proposed Revisions to Maintenance Rule Standard Review Plan

    Science.gov (United States)

    2013-08-08

    ... (ML13015A125), Current Revision 1 (ML072920088), Redline (ML13015A426). NRC's PDR: You may examine and purchase.... The NRC staff has no intention to impose the SRP positions on existing licensees either now or in...

  3. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ... Control District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan...

  4. 77 FR 65294 - Approval and Promulgation of Implementation Plans; California; Revisions to the California State...

    Science.gov (United States)

    2012-10-26

    ... active ingredient methyl iodide. 3 CCR sections 6448.1, 6449.1, and 6450.1 pertaining to fumigation..., we do not view our approval of the revised SIP commitment for SJV as a relaxation in the California...

  5. 76 FR 37044 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-06-24

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control..., Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Particulate...

  6. 76 FR 70886 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-16

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  7. 77 FR 2228 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-17

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  8. 77 FR 25384 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-30

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... Environmental protection, Air pollution control, Intergovernmental relations, Ozone, Reporting and...

  9. 76 FR 53640 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-29

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  10. 76 FR 47076 - Revision to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-04

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of a revision to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  11. 76 FR 69135 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-08

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  12. 77 FR 35327 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control,...

  13. 78 FR 6740 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2013-01-31

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley United Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  14. 76 FR 56134 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-12

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... protection, Air pollution control, Intergovernmental relations, Ozone, Reporting and...

  15. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  16. 一种基于SPIHT和匹配追踪的图像编码方法——SPMP算法%The SPMP algorithm: an image coding method based on SPIHT and matching pursuit

    Institute of Scientific and Technical Information of China (English)

    牛建伟; 高宾; 沈思思

    2011-01-01

    为了更好地利用图像的结构特征,提高图像重建的质量,提出了一种基于多级树集合划分(SPIHT)和匹配追踪(MP)的分层图像编码方法--(SPMP)算法.该方法首先采用拉普拉斯金字塔(Laplacian Pyramid)算法将原始图像分解成低频平滑层和高频细节层,然后使用离散小波变换和SPIHT算法编码图像的低频成分,使用基于克隆选择的匹配追踪算法编码图像的高频细节层.实验结果表明,该方法能够产生渐进:PSNR的位流,图像重建质量要明显高于小波图像编码算法.%To make full use of the structural characteristics of original images to improve reconstructed images' quality this paper proposes a novel hierarchical image encoding method based on set partitioning in hierarchical trees (SPIHT) and matching pursuit (MP) algorithm, named the SPMP algorithm. This new method divides the original images into a smooth layer in low frequency and a detail layer in high frequency by using the Laplacian Pyramid algorithm. In the smooth layer, it uses the discrete wavelet to transform the images from the space domain to the frequency domain, and then it encodes the coefficients in the frequency domain by using the SPIHT algorithm. The method adopts the matching pursuit (MP) algorithm to encode the detail layer based on the clone selection algorithm. The experimental results demonstrate that when using the SPMP algorithm, the output bitstream is embedded with the progressive peak signal-to-noise ratio (PSNR), and the reconstructed images quality is significantly better than that obtained using the wavelet transform encoding, even more obviously under the high compression ratio.

  17. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  18. Plans for the Development and Revision of Industry Standards on Inspection and Quarantine from 2005-2007

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    @@ The inspection and quarantine standard is one of important basics to execute inspection and quarantine by laws. In recent years, with the development of economy and trade in China, standardization has played an important role in inspection and quarantine. During 2002-2004, department of Standards of Inspection and Quarantine, Certification and Accreditation Administration of China has organized the research of the standards of inspection and quarantine, and has built standard subsystems of nine fields in inspection and quarantine. At the same time, they have made the standard list of each specialized fields,and especially established the Development and Revision Plan of Industry Standards on Inspection and Quarantine.

  19. Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1978-01-01

    The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential performance of heat pumps, data required from cooling contractors, cooling locations, thermal outputs: cooling, recommended inputs for the 25 ton advanced cooling simulation study, meteorological data, and contract modification. (MHR)

  20. 76 FR 20242 - Revisions to the California State Implementation Plan; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2011-04-12

    ... landfill gas flare at the Kiefer Landfill in Sacramento, California. We are approving portions of a Permit... gas flare. The SMAQMD originally issued Permit No. 17359 on August 7, 2006, and later revised it on... NO X limitation satisfying RACT for the air pollution control landfill gas flare at the...

  1. 75 FR 61369 - Revisions to the California State Implementation Plan; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-10-05

    ... oxides of nitrogen (NO X ) from the landfill gas flare at the Kiefer Landfill in Sacramento, California... landfill gas flare. The SMAQMD originally issued Permit No. 17359 on August 7, 2006, and later revised it... landfill gas flare at the Kiefer Landfill, which is a major source of NO X emissions.\\2\\ \\1\\ The...

  2. 77 FR 73322 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Monterey Bay Unified Air Pollution... several different types of sources, ranging from fugitive dust to gas turbines. We are approving a local...

  3. 77 FR 73392 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Monterey Bay Unified Air Pollution Control District... types of sources, ranging from fugitive dust to gas turbines. We are proposing to approve a local rule...

  4. 77 FR 10323 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Science.gov (United States)

    2012-02-21

    ... its nuclear generation unavailable in the immediate future (76 FR 63867). EPA received public comments... operating nuclear unit. See section IV.A of this preamble for a discussion of these revisions and any... discovered a football-sized cavity atop the reactor vessel head. The Nuclear Regulatory Commission...

  5. 75 FR 4698 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2010-01-29

    ... Administrative Rules of Montana. Revisions include minor editorial and grammatical changes, updates to the... minor editorial and grammatical changes, and update the citations and references to Federal laws and... Montana; they make minor editorial and grammatical changes, update the citations and references to...

  6. 75 FR 28509 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-05-21

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... Association of Home Builders v. San Joaquin Valley Unified Air Pollution Control District, No. 08-17309 (9th...

  7. 75 FR 37727 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-06-30

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing disapproval of a revision to the Monterey Bay Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  8. 76 FR 52623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-23

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations...

  9. 77 FR 35329 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental...

  10. 77 FR 24883 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental...

  11. 76 FR 26609 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-05-09

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... Valley Unified Air Pollution Control District (No. 08-17309)] to overturn a District Court ruling that...

  12. 78 FR 32131 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-05-29

    ... Ozone and Particulate Matter NAAQS and Regional Haze Regulations'' (hereafter ``emissions inventory... analysis, also called receptor modeling or source apportionment, is a method of using chemical signatures...: 0 a. In paragraph (c) Table 4 by revising entries 13.01 through 13.05, adding in numerical...

  13. 76 FR 40660 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2011-07-11

    .... SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Air Pollution Control District....0 for the following terms: Air Pollution Control Officer, Board, Environmental Protection Agency.... New Section 6.3 requires the SJVUAPCD Air Pollution Control Officer (APCO) to prepare and present...

  14. 75 FR 10690 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-03-09

    ... is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control District (SJVAPCD...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control... Joaquin Valley Unified Air Pollution Control District. (1) Rule 4104, ``Reduction of Animal Matter,''...

  15. 76 FR 39357 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ... Pollution Control District, Kern County Air Pollution Control District, and Ventura County Air Pollution... proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District...

  16. 78 FR 6736 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ... taking direct final action to approve revisions to the Placer County Air Pollution Control District... regulations that control VOCs, NO X , and PM emissions. Rules 301-306 limit emissions of air pollutants... Toxic Control Measure to Reduce Emissions of Toxic Air Contaminants from Outdoor Residential...

  17. 77 FR 35866 - Approval and Promulgation of Implementation Plans; Revisions to the Georgia State Implementation...

    Science.gov (United States)

    2012-06-15

    .... Rome Conformity SIP III. State Submittal and EPA Evaluation IV. Public Comment and Final Action V... procedures (``Conformity Rule'') on November 24, 1993 (58 FR 62188). Among other things, the rule required... revision which incorporated by reference 40 CFR 93 Subpart A, 67 FR 60869, and customized 40 CFR 93.105,...

  18. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-07-26

    ... proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of... Rule 431.1 was actually for the South Coast Air Quality Management District (SCAQMD). The Antelope... Antelope Valley amended or rescinded the rule. On January 1, 2002, Antelope Valley Air Quality...

  19. 78 FR 74012 - Approval and Promulgation of Implementation Plans; State of Oregon; Revised Format for Materials...

    Science.gov (United States)

    2013-12-10

    ..., and small business assistance programs. H. When a SIP Revision Becomes Federally Enforceable All... by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a... Degreasers. 2891. 232-0210 Asphaltic and Coal 10/14/1999 1/22/2003, 68 FR Tar Pitch Used for 2891....

  20. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program... Principles for Institutions of Higher Education,” OMB Circular A-122, “Cost Principles for...

  1. 76 FR 30600 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to Clean Air...

    Science.gov (United States)

    2011-05-26

    ... (CAIR) trading program, is comprised of technical corrections and revisions to the definition of a cogeneration unit to ensure the Commonwealth's CAIR trading program is consistent with Federal CAIR... to Clean Air Interstate Rule Emissions Trading Program AGENCY: Environmental Protection Agency (EPA...

  2. 78 FR 49685 - Approval and Promulgation of Air Quality Implementation Plans; State of Wyoming; Revised General...

    Science.gov (United States)

    2013-08-15

    ... better explanation of conformity regulations and policies (75 FR 17254, April 5, 2010). EPA's April 2010... natural ] disasters and keep the provisions to address emergencies. h. Section 3(c)(v)(B)(I) adds language..., 2013 (see 78 FR 26563). The SIP submission addressed revisions and additions to the State's...

  3. 77 FR 7531 - Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2012-02-13

    ... concrete plants, mineral crushers'' in new rule ARM 17.8.743(1)(b) as submitted by the State of Montana on... proposed an action for the above SIP revision submittals on September 26, 2011 (76 FR 59338). We accepted..., particulate matter, carbon monoxide (CO), sulfur dioxide (SO 2 ), lead, nitrogen oxides (NO X ) or any...

  4. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... taking direct final action to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality Management District (SMAQMD), and South Coast Air Quality...

  5. 78 FR 35599 - Approval and Promulgation of Implementation Plans; Florida; Approval of Revision to the State...

    Science.gov (United States)

    2013-06-13

    ... Florida to remove a provision entitled ``Synthetic Organic Fiber Production.'' EPA has determined that..., 1992, SIP did not include a revision to incorporate the rule entitled ``Synthetic Organic Fiber...) Requirements The rule entitled ``Synthetic Organic Fiber Production,'' 62- 296.413, was originally...

  6. 77 FR 72968 - Revisions to the California State Implementation Plan, for Imperial County, Placer County and...

    Science.gov (United States)

    2012-12-07

    ... County and Ventura County Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Placer County Air Pollution Control...

  7. 76 FR 12280 - Revisions to the California State Implementation Plan, for Imperial County, Kern County, and...

    Science.gov (United States)

    2011-03-07

    ... County, and Ventura County; Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District...

  8. 76 FR 30025 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ... Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution...

  9. 76 FR 39303 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ... Pollution Control District, Kern County Air Pollution Control District, and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control...

  10. 76 FR 75795 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2011-12-05

    ... Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District... the environment. Section 110(a) of the CAA requires States to submit regulations that control...

  11. 76 FR 60376 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ... taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District... Control District, Sacramento Municipal Air Quality Management District and South Coast Air Quality... the environment. Section 110(a) of the CAA requires States to submit regulations that control...

  12. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-01-31

    ... Control District, Antelope Valley Air Quality Management District, Ventura County Air Pollution Control District and Placer County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the...

  13. 75 FR 48860 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to Emissions...

    Science.gov (United States)

    2010-08-12

    ... criteria pollutants such as ozone, particulate matter, and carbon monoxide. The revisions add new... Mexico outside of Bernalillo County to report emissions location information, PM 2.5 emissions, and..., and currently address six criteria pollutants: carbon monoxide, nitrogen dioxide, ozone,...

  14. 78 FR 23677 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-04-22

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD...) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and...

  15. 78 FR 922 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-01-07

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... disturbed soils in open and agricultural areas in Imperial County. We are proposing to approve local...

  16. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... emissions. The submitted rule applies to both active and inactive municipal solid waste (MSW) landfills and defines an active MSW landfill as one that has received solid waste on or after November 8, 1987. The two... with the relevant policy and guidance regarding enforceability, RACT and SIP relaxations. The revisions...

  17. 77 FR 64427 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-10-22

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... County Air Pollution Control District (VCAPCD) there is no VOC concentration limit for reinjection...

  18. 77 FR 214 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-04

    ... Air Pollution Control District (SJVUAPCD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control... and air districts for evaluating air pollution control economics. 3. Farms can change owners...

  19. 76 FR 5276 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-01-31

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  20. 77 FR 66429 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-05

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation...

  1. 75 FR 24408 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-05-05

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  2. 77 FR 5709 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-02-06

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  3. 75 FR 1715 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-01-13

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  4. 75 FR 57862 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-09-23

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation...

  5. 76 FR 16696 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-03-25

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  6. 76 FR 56132 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-12

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... preempt Tribal law. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  7. 76 FR 41705 - Approval and Promulgation of Implementation Plans; New York; Revised Format of Materials Being...

    Science.gov (United States)

    2011-07-15

    ... burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's compliance with these..., Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: June 1, 2011... as a SIP revision. Part 226, Solvent Metal Cleaning 5/7/03 1/23/04, 69 FR 3240 Processes. Part...

  8. MAR ASSESSMENTS OF THE HIGH LEVEL WASTE SYSTEM PLAN REVISION 16

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, D.; Edwards, T.

    2011-08-05

    High-level waste (HLW) throughput (i.e., the amount of waste processed per unit of time) is primarily a function of two critical parameters: waste loading (WL) and melt rate. For the Defense Waste Processing Facility (DWPF), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). Significant increases in waste throughput have been achieved at DWPF since initial radioactive operations began in 1996. Key technical and operational initiatives that supported increased waste throughput included improvements in facility attainment, the Chemical Processing Cell (CPC) flowsheet, process control models and frit formulations. As a result of these key initiatives, DWPF increased WLs from a nominal 28% for Sludge Batch 2 (SB2) to {approx}34 to 38% for SB3 through SB6 while maintaining or slightly improving canister fill times. Although considerable improvements in waste throughput have been obtained, future contractual waste loading targets are nominally 40%, while canister production rates are also expected to increase (to a rate of 325 to 400 canisters per year). Although implementation of bubblers have made a positive impact on increasing melt rate for recent sludge batches targeting WLs in the mid30s, higher WLs will ultimately make the feeds to DWPF more challenging to process. Savannah River Remediation (SRR) recently requested the Savannah River National Laboratory (SRNL) to perform a paper study assessment using future sludge projections to evaluate whether the current Process Composition Control System (PCCS) algorithms would provide projected operating windows to allow future contractual WL targets to be met. More specifically, the objective of this study was to evaluate future sludge batch projections (based on Revision 16 of the HLW Systems Plan) with respect to projected operating windows using current PCCS models and associated constraints. Based on the assessments, the waste loading interval

  9. Revised Comprehensive Conservation Plan: Alaska Peninsula and Becharof National Wildlife Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Alaska Peninsula and Becharof NWRs for the next 15 years. This plan outlines the...

  10. Revised Comprehensive Conservation Plan and Environmental Impact Statement: Kodiak National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Kodiak NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  11. Revised Comprehensive Conservation Plan for the Koyukuk/Northern Unit Innoko/Nowitna National Wildlife Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Koyukuk, Northern Unit Innoko, and Nowitna NWRs for the next 15 years. This plan...

  12. Revision Notes

    CERN Document Server

    Matthewson, Siobhan; Debbadi, Margaret

    2012-01-01

    Revision Notes: CCEA ICT for GCSE has been written by experienced teachers and examiners so that you can be confident that it covers only the facts and ideas you will be expected to recall and use in the exam. - Essential facts are carefully organised to make revising easier. - Exams tips show you how to avoid losing marks and get the best grade. - Check your understanding questions support you in the run-up to the exams, with answers provided free online at www.hodderplus.co.uk. This book will help you plan and pace your revision to suit your learning needs and can be integrated with other re

  13. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site.

  14. A Multi-Objective Model for Planning Equal Employment Opportunities. Research Report No. 23. Revised Edition.

    Science.gov (United States)

    Charnes, A.; And Others

    The document suggests some new modeling approcaches for equal employment opportunity (EEO) planning. Previous manpower planning models of the Office of Civilian Manpower Management have utilized multi-period Markoff processes embedded in goal programing (multiple objective) models. These are here extended to EEO plans directed to changing the mix…

  15. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  16. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  17. 77 FR 66783 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2012-11-07

    ... AGENCY 40 CFR Part 300 RIN 2050-AG73] National Oil and Hazardous Substances Pollution Contingency Plan... Oil and Hazardous Substances Pollution Contingency Plan, to acknowledge advancements in technologies... Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to amend the National Oil and...

  18. 77 FR 66729 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2012-11-07

    ... decision. See 55 FR 8666, 8804-5 (March 6, 1990) (National Oil and Hazardous Substances Pollution... AGENCY 40 CFR Part 300 RIN 2050-AG73 National Oil and Hazardous Substances Pollution Contingency Plan... Oil and Hazardous Substances Pollution Contingency Plan (NCP), to acknowledge advancements...

  19. 77 FR 58067 - Disapproval of Implementation Plan Revisions; State of California; South Coast VMT Emissions...

    Science.gov (United States)

    2012-09-19

    .... Email: tax.wienke@epa.gov . Mail or deliver: Wienke Tax, Air Planning Office, U.S. Environmental... FURTHER INFORMATION CONTACT section below. FOR FURTHER INFORMATION CONTACT: Wienke Tax, Air Planning... Francisco, California 94105-3901, 415-947-4192, tax.wienke@epa.gov . SUPPLEMENTARY INFORMATION: Throughout...

  20. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  1. 78 FR 13604 - Approval and Promulgation of Implementation Plans; Tennessee; Revisions to the Knox County...

    Science.gov (United States)

    2013-02-28

    ..., Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection... Benjamin, Chief, Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management...-8960. Such deliveries are only accepted during the Regional Office's normal hours of operation....

  2. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T.

    1994-10-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan`s purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements.

  3. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  4. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  5. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Powell, H.T.; Kilkenny, J.D. [eds.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program.

  6. 76 FR 41745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-07-15

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Valley Unified Air Pollution Control District portion of the California State Implementation Plan (SIP... Valley Unified Air Pollution Control District (SJVUAPCD) Rule 4682, Polystyrene, Polyethylene, and...

  7. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2010-02-23

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). These... construction sites, unpaved roads, and disturbed soils in open and agricultural areas. We are proposing...

  8. 78 FR 49990 - Approval and Promulgation of Implementation Plans; Tennessee; Revisions to the Knox County...

    Science.gov (United States)

    2013-08-16

    ... address, as appropriate, disproportionate human health or environmental effects, using practicable and... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental... Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S....

  9. Water Management Plan for the Rocky Mountain Arsenal National Wildlife Refuge (revised January 2017)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents the legal framework and monitoring protocols associated with water quantity and quality on the Rocky Mountain Arsenal National Wildlife Refuge...

  10. Revising the South African guidelines for human settlement planning and design (the red book)

    CSIR Research Space (South Africa)

    Van Niekerk, Willemien

    2015-11-01

    Full Text Available The Guidelines for Human Settlement Planning and Design, commonly known as the Red Book, is a South African publication aimed at providing practical guidance to built environment professionals in support of the creation of sustainable and vibrant...

  11. Station Safety Plan for the Rocky Mountain Arsenal National Wildlife Refuge Complex (revised January 2014)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan assesses risks associated with the station, outlines the procedures for safe operation of the station, and provides specific information and procedures to...

  12. Kenai National Wildlife Refuge Skilak Wildlife Recreation Area Revised Final Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purposes of this final management plan are: 1. To describe wildlife viewing, interpretation, and photography opportunities within the Skilak WRA; 2. To identify...

  13. Robust, Multi-layered Plan Execution and Revision for Operation of a Network of Communication Antennas

    Science.gov (United States)

    Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.

    1996-01-01

    This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.

  14. Quality program plan for the Ultraviolet Spectrometer Experiment S169, Revision C

    Science.gov (United States)

    Vinson, W. W.

    1971-01-01

    The quality progress plan establishes the requirements for a system of controls to assure compliance with the quality assurance requirements as set forth in NASA quality program provisions for aeronautical and space system contractors.

  15. Survey of ANL organization plans for word processors, personal computers, workstations, and associated software. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Fenske, K.R.

    1991-11-01

    The Computing and Telecommunications Division (CTD) has compiled this Survey of ANL Organization Plans for Word Processors, Personal Computers, Workstations, and Associated Software to provide DOE and Argonne with a record of recent growth in the acquisition and use of personal computers, microcomputers, and word processors at ANL. Laboratory planners, service providers, and people involved in office automation may find the Survey useful. It is for internal use only, and any unauthorized use is prohibited. Readers of the Survey should use it as a reference that documents the plans of each organization for office automation, identifies appropriate planners and other contact people in those organizations, and encourages the sharing of this information among those people making plans for organizations and decisions about office automation. The Survey supplements information in both the ANL Statement of Site Strategy for Computing Workstations and the ANL Site Response for the DOE Information Technology Resources Long-Range Plan.

  16. Underground Test Area Activity Communication/Interface Plan, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States); Rehfeldt, Kenneth [Navarro, Las Vegas, NV (United States)

    2016-10-01

    The purpose of this plan is to provide guidelines for effective communication and interfacing between Underground Test Area (UGTA) Activity participants, including the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and its contractors. This plan specifically establishes the following: • UGTA mission, vision, and core values • Roles and responsibilities for key personnel • Communication with stakeholders • Guidance in key interface areas • Communication matrix

  17. Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-14

    This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

  18. Search Hanford Accessible Reports Electronically system test plan and documentation: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    White, E.L.

    1994-12-07

    The purpose of this document is to describe the following items: the approach, resources, and sequence of the testing activities; identifies the components and features to be tested; the personnel responsible for testing; the risks associated with this plan; and test cases and procedures. This document contains all test documentation for the SHARE system. The Search Hanford Accessible Reports Electronically (SHARE) testing process is based upon WHC-CM-3-10, Software Practices, Section SP-3.3 REV 0, and Appendix J REV 0. These procedures and guidelines are based on IEEE Standard 829-1983. The planning in this document was further influenced through guidance in IEEE Standard 1012-1986. This document contains the System, Acceptance, Integration and Component Test Plans, Designs, Procedures, and Cases for SHARE. The Test Cases and procedures have been attached to the document.

  19. Corrective measures evaluation work plan : Technical Area V Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Lebow, Patrick S.; Dettmers, Dana L.; Hall, Kevin A.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories/New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  20. REVISED NATIONAL PLAN - STRATEGY FOR HARMONISATION OF SERBIAN QUALITY INFRASTRUCTURE WITH EU

    Directory of Open Access Journals (Sweden)

    Borislava Jakšić

    2007-09-01

    Full Text Available Every country candidate for European Union has to fulfill a number of criteria for the membership including political (democracy, human rights and economic (functioning of market economy as well as to adopt "Acquis communautaire" (the entire European legislation of about 11.000 acts. Preparation for membership to European Union is a process that requires very careful planning and organization. Serbia has to take all necessary steps in order to remove technical barriers to trade and gradually to achieve conformity with Community technical regulations and standards within the National Quality Plan.

  1. Rational decision perspectives on alcohol consumption by youth. Revising the theory of planned behavior.

    Science.gov (United States)

    Kuther, Tara L

    2002-01-01

    Cognitive and developmental approaches have made great strides in describing and predicting alcohol consumption by youth. The present review examines several theories of decision making with regard to alcohol consumption, including subjective expected utility (SEU) theory, the theories of reasoned action and planned behavior, and alcohol-related outcome expectancy theory. In addition, the developmental literature on the contribution of parents and peers to adolescent alcohol consumption is reviewed. A model is proposed, which integrates the theory of planned behavior and alcohol-related outcome expectancy theory with modifications based on findings from the developmental literature. Implications for further research are discussed.

  2. 78 FR 4333 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-01-22

    ... AGENCY 40 CFR Part 300 RIN 2050-AG73 National Oil and Hazardous Substances Pollution Contingency Plan... are withdrawing the direct final rule for National Oil and Hazardous Substances Pollution Contingency... 7, 2012. DATES: Effective January 22, 2013, EPA withdraws the direct final rule published at 77...

  3. 78 FR 42051 - Proposed Revision of the Corporation for National and Community Service Strategic Plan; Request...

    Science.gov (United States)

    2013-07-15

    ... service so that participants engaged in CNCS-supported programs consistently find satisfaction, meaning... Plan will reflect the broad, long term outcomes that the CNCS aspires to achieve by implementing its... may submit comments by any of the following methods: (1) Electronically through the Corporation's...

  4. Researchers Apply Lesson Study: A Cycle of Lesson Planning, Implementation, and Revision

    Science.gov (United States)

    Regan, Kelley S.; Evmenova, Anya S.; Kurz, Leigh Ann; Hughes, Melissa D.; Sacco, Donna; Ahn, Soo Y.; MacVittie, Nichole; Good, Kevin; Boykin, Andrea; Schwartzer, Jessica; Chirinos, David S.

    2016-01-01

    Scripted lesson plans and/or professional development alone may not be sufficient to encourage teachers to reflect on the quality of their teaching and improve their teaching. One learning tool that teachers may use to improve their teaching is Lesson Study (LS). LS is a collaborative process involving educators, based on concepts of iteration and…

  5. 77 FR 50021 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-08-20

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: In this action, EPA is finalizing approval of San Joaquin Valley Unified Air Pollution Control... plans that are specifically tailored to the nature of the air pollution sources in each state. The Act...

  6. 75 FR 3996 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-01-26

    ... Planning, San Joaquin Valley Air Pollution Control District; letter dated and received August 17, 2009... Sadredin, Executive Director/Air Pollution Control Officer of San Joaquin Valley Air Pollution Control... emission control requirements of Rule 4684 are consistent with the California Air Resources Board's...

  7. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-07-02

    ... Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental... Identification of plan. * * * * * (c) * * * (364) * * * (i) * * * (D) Mojave Desert Air Quality Management...) * * * (F) Yolo-Solano Air Quality Management District. (1) Rule 2.43, ``Biomass Boilers,'' adopted...

  8. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  9. Nuclear Technology Series. Radiation Protection Technician. A Suggested Program Planning Guide. Revised June 80.

    Science.gov (United States)

    Center for Occupational Research and Development, Inc., Waco, TX.

    This program planning guide for a two-year postsecondary radiation protection technician program is designed for use with courses 17-22 of thirty-five included in the Nuclear Technology Series. The purpose of the guide is to describe the nuclear power field and its job categories for specialists, technicians, and operators; and to assist planners,…

  10. Proposed site treatment plan (PSTP) Volumes I & II & reference document, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S. [and others

    1995-09-27

    The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort to develop Site Treatment Plans for each of its sites generating or storing mixed waste. Mixed waste contains both a hazardous waste subject to the Resource Conservation and Recovery Act and radioactive material subject to the Atomic Energy Act of 1954. The Site Treatment Plan for the Savannah River Site proposes how SRS will treat mixed waste that is now stored on the site and mixed waste that Will be generated in the future. Also, the Site Treatment Plan identifies Savannah River Site mixed wastes that other Department of Energy facilities could treat and mixed waste from other facilities that the Savannah River Site could treat. The Site Treatment Plan has been approved by the State of South Carolina. The Department of Energy Will enter into a consent order with the State of South Carolina by October 6, 1995. The consent order will contain enforceable commitments to treat mixed waste.

  11. 76 FR 59338 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2011-09-26

    ... conformity motor vehicle emission budgets (MVEB) for 2000, 2010, and 2020. The town of Great Falls, located... designation, control plans were developed, but none were EPA approved. Great Falls was reevaluated in... 1988 and 1989. On November 6, 1991 (56 FR 56799), Great Falls was listed as a ``not...

  12. Energy Systems Integration Facility (ESIF): Facility Stewardship Plan, Revision 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Art [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hannegan, Bryan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy, has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-sq. ft. research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan serves to provide DOE and other decision makers with information on the existing and expected capabilities of ESIF, and the expected performance metrics to be applied to ESIF operations. This Plan is a living document that will be updated and refined throughout the lifetime of the facility.

  13. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  14. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1993-12-01

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.

  15. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344.

  16. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  17. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  18. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  19. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  20. Supplemental Investigation Plan for FFACO Use Restrictions, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Lynn Kidman

    2008-02-01

    This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006a). After reviewing all of the existing FFACO URs, the 12 URs addressed in this Supplemental Investigation Plan (SIP) could not be evaluated against the current RBCA criteria as sufficient information about the contamination at each site was not available. This document presents the plan for conducting field investigations to obtain the needed information. This SIP includes URs from Corrective Action Units (CAUs) 326, 339, 358, 452, 454, 464, and 1010, located in Areas 2, 6, 12, 19, 25, and 29 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada; and CAU 403, located in Area 3 of the Tonopah Test Range, which is approximately 165 miles north of Las Vegas, Nevada.

  1. Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Juarez, Catherine L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Funk, David John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Vigil-Holterman, Luciana R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Naranjo, Felicia Danielle [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-03-07

    The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide the basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.

  2. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  3. Demonstration testing and evaluation of in situ soil heating. Health and safety plan (Revision 2)

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.

    1994-12-28

    This document is the Health and Safety Plan (HASP) for the demonstration of IITRI`s EM Treatment Technology. In this process, soil is heated in situ by means of electrical energy for the removal of hazardous organic contaminants. This process will be demonstrated on a small plot of contaminated soil located in the Pit Area of Classified Burial Ground K-1070-D, K-25 Site, Oak Ridge, TN. The purpose of the demonstration is to remove organic contaminants present in the soil by heating to a temperature range of 85{degrees} to 95{degrees}C. The soil will be heated in situ by applying 60-Hz AC power to an array of electrodes placed in boreholes drilled through the soil. In this section a brief description of the process is given along with a description of the site and a listing of the contaminants found in the area.

  4. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.

  5. Next Generation Nuclear Plant Materials Research and Development Program Plan, Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    G.O. Hayner; R.L. Bratton; R.E. Mizia; W.E. Windes; W.R. Corwin; T.D. Burchell; C.E. Duty; Y. Katoh; J.W. Klett; T.E. McGreevy; R.K. Nanstad; W. Ren; P.L. Rittenhouse; L.L. Snead; R.W. Swindeman; D.F. Wlson

    2007-09-01

    DOE has selected the High Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production. It will have an outlet gas temperature in the range of 950°C and a plant design service life of 60 years. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed reactor and use low-enriched uranium, TRISO-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. Some of the general and administrative aspects of the R&D Plan include: • Expand American Society of Mechanical Engineers (ASME) Codes and American Society for Testing and Materials (ASTM) Standards in support of the NGNP Materials R&D Program. • Define and develop inspection needs and the procedures for those inspections. • Support selected university materials related R&D activities that would be of direct benefit to the NGNP Project. • Support international materials related collaboration activities through the DOE sponsored Generation IV International Forum (GIF) Materials and Components (M&C) Project Management Board (PMB). • Support document review activities through the Materials Review Committee (MRC) or other suitable forum.

  6. Human Health Countermeasures (HHC) Element Management Plan: Human Research Program. Revision B

    Science.gov (United States)

    Norsk, Peter; Baumann, David

    2012-01-01

    NASA s Human Research Program (HRP) is an applied research and technology program within the Human Exploration and Operations Mission Directorate (HEOMD) that addresses human health and performance risk mitigation strategies in support of exploration missions. The HRP research and technology development is focused on the highest priority risks to crew health and safety with the goal of ensuring mission success and maintaining long-term crew health. Crew health and performance standards, defined by the NASA Chief Health and Medical Officer (CHMO), set the acceptable risk level for exploration missions. The HRP conducts research to inform these standards as well as provide deliverables, such as countermeasures, that ensure standards can be met to maximize human performance and mission success. The Human Health Countermeasures (HHC) Element was formed as part of the HRP to develop a scientifically-based, integrated approach to understanding and mitigating the health risks associated with human spaceflight. These health risks have been organized into four research portfolios that group similar or related risks. A fifth portfolio exists for managing technology developments and infrastructure projects. The HHC Element portfolios consist of: a) Vision and Cardiovascular; b) Exercise and Performance; c) Multisystem; d) Bone; and e) Technology and Infrastructure. The HHC identifies gaps associated with the health risks and plans human physiology research that will result in knowledge required to more fully understand risks and will result in validated countermeasures to mitigate risks.

  7. Readiness plan, Hanford 300 Area Treated Effluent Disposal Facility: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Storm, S.J.

    1994-11-08

    The 300 Area Treated Effluent Disposal Facility (TEDF) is designed for the collection, treatment, and eventual disposal of liquid waste from the 300 Area Process Sewer (PS) system. The PS currently discharges water to the 300 Area Process Trenches. Facilities supported total 54 buildings, including site laboratories, inactive buildings, and support facilities. Effluent discharges to the process sewer from within these facilities include heating, ventilation, and air conditioning systems, heat exchangers, floor drains, sinks, and process equipment. The wastewaters go through treatment processes that include iron coprecipitation, ion exchange and ultraviolet oxidation. The iron coprecipitation process is designed to remove general heavy metals. A series of gravity filters then complete the clarification process by removing suspended solids. Following the iron coprecipitation process is the ion exchange process, where a specific resin is utilized for the removal of mercury. The final main unit operation is the ultraviolet destruction process, which uses high power ultraviolet light and hydrogen peroxide to destroy organic molecules. The objective of this readiness plan is to provide the method by which line management will prepare for a Readiness Assessment (RA) of the TEDF. The self-assessment and RA will assess safety, health, environmental compliance and management readiness of the TEDF. This assessment will provide assurances to both WHC and DOE that the facility is ready to start-up and begin operation.

  8. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.

  9. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  10. Sampling and analysis plan for Mount Plant D & D soils packages, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-02-01

    There are currently 682 containers of soils in storage at Mound Plant, generated between April 1 and October 31, 1990 as a result of excavation of soils containing plutonium-238 at two ongoing Decontamination and Decommissioning (D&D) Program sites. These areas are known as Area 14, the waste transfer system (WTS) hillside, and Area 17, the Special Metallurgical (SM) Building area. The soils from these areas are part of Mound Plant waste stream number AMDM-000000010, Contaminated Soil, and are proposed for shipment to the Nevada Test Site (NTS) for disposal as low-level radioactive waste. The sealed waste packages, constructed of either wood or metal, are currently being stored in Building 31 and at other locations throughout the Mound facility. At a meeting in Las Vegas, Nevada on October, 26, 1990, DOE Nevada Operations Office (DOE-NV) and NTS representatives requested that the Mound Plant D&D soils proposed for shipment to NTS be sampled for Toxicity Characteristic Leaching Procedure (TCLP) constituents. On December 14, 1990, DOE-NV also requested that additional analyses be performed on the soils from one of the soils boxes for polychlorinated biphenyls (PCBs), particle size distribution, and free liquids. The purpose of this plan is to document the proposed sampling and analyses of the packages of D&D soils produced prior to October 31, 1990. In order to provide a thorough description of the soils excavated from the WTS and SM areas, sections 1.1 and 1.2 provide historical Information concerning the D&D soils, including waste stream evaluations and past sampling data.

  11. Effects of the Original versus Revised Bloom's Taxonomy on Lesson Planning Skills: A Turkish Study among Pre-Service Teachers

    Science.gov (United States)

    Bumen, Nilay T.

    2007-01-01

    The original taxonomy of educational objectives, developed by Benjamin S. Bloom and his associates in the 1950s, was revised several decades later by a group of educationists and cognitive psychologists, who developed a revised taxonomy (RT). This article describes a Turkish study carried out among a group of pre-service teachers in order to…

  12. 40 CFR 51.123 - Findings and requirements for submission of State implementation plan revisions relating to...

    Science.gov (United States)

    2010-07-01

    ... such undue risk, from other electricity generation facilities during the installation of control... section may be delegated to the State under section 114 of the CAA. (x)(1) A SIP revision may assign legal...). (z) Each SIP revision must provide for State compliance with the reporting requirements in §...

  13. Movement Disorder Society-sponsored revision of the Unified Parkinson's Disease Rating Scale (MDS-UPDRS): Process, format, and clinimetric testing plan.

    Science.gov (United States)

    Goetz, Christopher G; Fahn, Stanley; Martinez-Martin, Pablo; Poewe, Werner; Sampaio, Cristina; Stebbins, Glenn T; Stern, Matthew B; Tilley, Barbara C; Dodel, Richard; Dubois, Bruno; Holloway, Robert; Jankovic, Joseph; Kulisevsky, Jaime; Lang, Anthony E; Lees, Andrew; Leurgans, Sue; LeWitt, Peter A; Nyenhuis, David; Olanow, C Warren; Rascol, Olivier; Schrag, Anette; Teresi, Jeanne A; Van Hilten, Jacobus J; LaPelle, Nancy

    2007-01-01

    This article presents the revision process, major innovations, and clinimetric testing program for the Movement Disorder Society (MDS)-sponsored revision of the Unified Parkinson's Disease Rating Scale (UPDRS), known as the MDS-UPDRS. The UPDRS is the most widely used scale for the clinical study of Parkinson's disease (PD). The MDS previously organized a critique of the UPDRS, which cited many strengths, but recommended revision of the scale to accommodate new advances and to resolve problematic areas. An MDS-UPDRS committee prepared the revision using the recommendations of the published critique of the scale. Subcommittees developed new material that was reviewed by the entire committee. A 1-day face-to-face committee meeting was organized to resolve areas of debate and to arrive at a working draft ready for clinimetric testing. The MDS-UPDRS retains the UPDRS structure of four parts with a total summed score, but the parts have been modified to provide a section that integrates nonmotor elements of PD: I, Nonmotor Experiences of Daily Living; II, Motor Experiences of Daily Living; III, Motor Examination; and IV, Motor Complications. All items have five response options with uniform anchors of 0 = normal, 1 = slight, 2 = mild, 3 = moderate, and 4 = severe. Several questions in Part I and all of Part II are written as a patient/caregiver questionnaire, so that the total rater time should remain approximately 30 minutes. Detailed instructions for testing and data acquisition accompany the MDS-UPDRS in order to increase uniform usage. Multiple language editions are planned. A three-part clinimetric program will provide testing of reliability, validity, and responsiveness to interventions. Although the MDS-UPDRS will not be published until it has successfully passed clinimetric testing, explanation of the process, key changes, and clinimetric programs allow clinicians and researchers to understand and participate in the revision process.

  14. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  15. 区域旅游发展规划修编的理论与方法%Theory and Method of Regional Tourism Development Planning Revision

    Institute of Scientific and Technical Information of China (English)

    李庆雷; 孔慧

    2012-01-01

      With the change of tourism demand, planning concepts, the external environment and internal conditions of tourism development, the regional tourism development planning revision becomes an important type of tourism planning at this stage. Tourism planning revision should base on the tourism system dynamic equilibrium theory, tourist destination development theory, tourism planning innovation theory and other theories, insist on the technical route of three basic analysis, one re-positioning, three adjustment and three optimizations, take tourism development positioning as a core and mainly consider the spatial distribution adjustment, product structure optimization and brand image enhancement.%  随着旅游需求与规划理念、外部环境与内在条件的变化,区域旅游发展规划修编成为现阶段旅游规划的重要类型。旅游规划修编应在旅游系统动态平衡、旅游地再开发、旅游规划创新等理论的基础上,坚持三个基础分析、一个重新定位、三个调整、三个优化的技术路线,把旅游发展定位作为核心,重点考虑空间布局调整、产品结构优化、品牌形象提升

  16. 76 FR 8300 - Finding of Failure To Submit State Implementation Plan Revisions for Particulate Matter, PM-10...

    Science.gov (United States)

    2011-02-14

    ... triggers the 18-month clock for mandatory application of sanctions and 2-year clock for a federal... cardiopulmonary system. Children, the elderly, and people with asthma and heart conditions are the most vulnerable. ] On July 1, 1987 EPA revised the health-based NAAQS (52 FR 24672), replacing the standards for...

  17. 76 FR 70354 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Science.gov (United States)

    2011-11-14

    ... making photocopies of documents. On the day of the visit, please check in at the EPA Region 6 reception... section under Subchapter D in its 7/22/1998 submittal, our analysis includes 12/15/95 and 7/22/98 SIP... revisions to 30 TAC 116.311 submitted September 4, 2002. A technical analysis of the submittals for...

  18. 77 FR 36964 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Science.gov (United States)

    2012-06-20

    ... 3, 2012, letter in the review of the March 11, 2011, SIP submittals. Today, EPA is proposing to find... Reform; Rule Project Number 2006-010-116-PR, adopted January 11, 2006. These revisions were originally... Thresholds and Emission Offsets; Rule Project Number 2008-030-116-PR, submitted March 11, 2011-1. New...

  19. Medicare program; revisions to the Medicare Advantage and prescription drug benefit programs: clarification of compensation plans. Interim final rule with comment period.

    Science.gov (United States)

    2008-11-14

    This interim final rule with comment period (IFC) revises the regulations governing the Medicare Advantage (MA) program (Part C), and prescription drug benefit program (Part D). This IFC sets forth new requirements governing the marketing of Part C and Part D plans which by statute must be in place at a date specified by the Secretary, but no later than November 15, 2008. The new marketing requirements, which set forth new limits on the compensation that can be paid to agents or brokers with respect to Part C and Part D plans, are based on authority under provisions in the Medicare Improvements for Patients and Providers Act (MIPPA) that became law on July 15, 2008.

  20. Final Environmental Impact Statement for the Stillwater National Wildlife Refuge Complex Comprehensive Conservation Plan and Boundary Revision

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Stillwater NWR Complex for the next 15 years. This plan outlines the Complex vision and...

  1. General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, S.R.

    1995-09-01

    This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

  2. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Science.gov (United States)

    2011-06-29

    ... Transmission Planning Group, California Transmission Planning Group, Sierra Subregional Planning Group, and Mid... supplier. e. Environmental impact--the degree to which the resource has an impact on the human environment... transmission path(s) used to get to the contracted location. f. Indian Preference--Under section 2602(d) of...

  3. Strategic Planning for Public and Nonprofit Organizations. A Guide to Strengthening and Sustaining Organizational Achievement. Revised Edition.

    Science.gov (United States)

    Bryson, John M.

    This book shows how leaders and managers of public and nonprofit organizations can use strategic planning to strengthen their organizations. This expanded edition includes many new examples of successful and unsuccessful strategic planning practices, along with new chapters that address how to implement strategies, how to reassess strategies and…

  4. 76 FR 18649 - Technical Revisions to Actuarial Information on Form 5500 Annual Return/Report for Pension Plans...

    Science.gov (United States)

    2011-04-05

    ... Form 5500 Annual Return/Report for Pension Plans Electing Funding Alternatives Under Pension Relief Act... defined benefit pension plans under the Preservation of Access to Care for Medicare Beneficiaries and Pension Relief Act of 2010 (Pension Relief Act). The information that would be required either by way of...

  5. 77 FR 50973 - Revision to the South Coast Portion of the California State Implementation Plan, CPV Sentinel...

    Science.gov (United States)

    2012-08-23

    ... System; and (3) which District Air Quality Management Plan (AQMP) is appropriate for determining the base... Quality Management District (District or SCAQMD) portion of the California SIP. This source-specific SIP... offsets; and (3) which District Air Quality Management Plan is appropriate for determining the base...

  6. 78 FR 41782 - Nez Perce-Clearwater National Forests; Idaho; Notice To Proceed With Forest Plan Revision

    Science.gov (United States)

    2013-07-11

    .... This process will ultimately result in a Forest Land Management Plan which describes the strategic direction for management of forest resources for the next ten to fifteen years on these National Forests.... Forest Plans describe the strategic direction for management of forest resources for ten to fifteen...

  7. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  8. Looking back to move forward: collaborative planning to revise the Green Mountain and Finger Lakes National Forests land and resource management plans

    Science.gov (United States)

    Michael J. Dockry

    2015-01-01

    The United States Department of Agriculture Forest Service (Forest Service) manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans) form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting...

  9. Black-footed Ferret (Mustela nigripes) Management Plan for the Rocky Mountain Arsenal National Wildlife Refuge (revised September 2016)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This adaptive “step-down” management plan documents the legal basis and monitoring protocols associated with reintroduction and management of federally endangered...

  10. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 2, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  11. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  12. Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200­-SW­-2 Operable Unit at the U.S. Department of Energy’s Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nimmons, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-09-01

    A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200­SW­1 and 200­SW­2 Collaborative Workshops-Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

  13. Draft Programmatic Environmental Impact Statement for Revision of the Coronado National Forest Land and Resource Management Plan: Cochise, Graham, Pima, Pinal, and Santa Cruz Counties, Arizona; Hidalgo County, New Mexico

    Science.gov (United States)

    Albert Peralta; Andrea Wargo Campbell; Ann Lynch; Cheri Bowen; Christopher Stetson; Craig Wilcox; Daniela Zormeier; Debby Kriegel; Delilah Jaworski; Dustin Walters; Eli Curiel; Erin Boyle; George McKay; Janet Moser; Jennifer Morrissey; Jennifer M. Ruyle; Jeremy Sautter; Judy York; Kenna Schoenle; Larry Jones; Laura White; Linda Peery; Mary Farrell; Mindi Lehew; Mindy Sue Vogel; Nicholas Laluk; Rachael Biggs; Robert Lefevre; Richard Gerhart; Salek Shafiqullah; Sara Dechter; Sarah Davis; Sharon Biedenbender; Tami Emmett; Terry Austin; William Gillespie; Yolynda Begay

    2013-01-01

    The U.S. Department of Agriculture, Forest Service, Coronado National Forest prepared this programmatic environmental impact statement to disclose the potential effects of a proposed action to revise the "Coronado National Forest Land and Resource Management Plan" (1986, as amended). The Coronado comprises 1,783,639 acres, most of which are located in...

  14. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries.

  15. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  16. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  17. Office of River Protection, plan for Developing Hanford Tank Waste Processing Alternatives, Revision 1, December 15, 1999

    Energy Technology Data Exchange (ETDEWEB)

    WODRICH, D.D.

    2000-01-03

    In August 2000, The Department of Energy (DOE) must decide whether to authorize BNFL Inc. (BNFL) to construct and operate tank waste processing facilities as proposed or to take another path. This will be a multi-billion dollar commitment, requiring that the best path forward be chosen. The plan for reaching this decision is described in reference 1. The alternative evaluations in this plan are directed toward acquiring information needed for the August 2000 decision and for preparing an alternate path plan, should an acceptable agreement with BNFL not be reached. Many of the alternatives considered may still be applicable for failures that could occur after the year 2000, however, depending on the cause of later failures, others alternatives may need to be developed.

  18. Nuclear emergency planning in Spain. The PLABEN review project; Planificacion de emergencias radiologicas en Espana. Revision del Plan Basico de Eergencia Nuclear (PLABEN)

    Energy Technology Data Exchange (ETDEWEB)

    Lentijo Lentijo, J. C.; Vila Pena, M. [Consejo de Seguridad Nuclear. Madrid (Spain)

    2002-07-01

    The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs.

  19. Environmental Regulatory Compliance Plan for Site Characterization; Yucca Mountain Site, Nevada Research and Development Area, Nevada: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab.

  20. Editorial: A revised aims and scope for Landscape and Urban Planning: an international journal of landscape and design

    Science.gov (United States)

    Paul H. Gobster; Wei-Ning. Xiang

    2012-01-01

    From time to time it is appropriate for editors to revisit a journal's aims and scope and assess whether the statement accurately describes what the journal is about to current and potential participants in the journal community as well as to broader societies of concern. With the third editorship of Landscape and Urban Planning now having been involved in...

  1. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    Energy Technology Data Exchange (ETDEWEB)

    BOGER, R.M.

    1999-05-13

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented.

  2. 75 FR 15403 - Plan Revision for Malheur, Umatilla and Wallowa-Whitman National Forests, Oregon and Washington...

    Science.gov (United States)

    2010-03-29

    ... cumulative effects of a periodic and sometimes extended drought, climate change, increasing vegetative... downstream users. 4. To address climate change. The 1990 forest plans do not address climate change. Climate... undesired non-native plant and animal species. The full extent of changes in response to climate change......

  3. Revising Translations

    DEFF Research Database (Denmark)

    Rasmussen, Kirsten Wølch; Schjoldager, Anne

    2011-01-01

    out by specialised revisers, but by staff translators, who revise the work of colleagues and freelancers on an ad hoc basis. Corrections are mostly given in a peer-to-peer fashion, though the work of freelancers and inexperienced in-house translators is often revised in an authoritative (nonnegotiable...

  4. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  5. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  6. Birth Satisfaction Scale/Birth Satisfaction Scale-Revised (BSS/BSS-R): A large scale United States planned home birth and birth centre survey.

    Science.gov (United States)

    Fleming, Susan E; Donovan-Batson, Colleen; Burduli, Ekaterina; Barbosa-Leiker, Celestina; Hollins Martin, Caroline J; Martin, Colin R

    2016-10-01

    to explore the prevalence of birth satisfaction for childbearing women planning to birth in their home or birth centers in the United States. Examining differences in birth satisfaction of the home and birth centers; and those who birthed in a hospital using the 30-item Birth Satisfaction Scale (BSS) and the 10-item Birth Satisfaction Scale-Revised (BSS-R). a quantitative survey using the BSS and BSS-R were employed. Additional demographic data were collected using electronic linkages (Qualtrics(™)). a convenience sample of childbearing women (n=2229) who had planned to birth in their home or birth center from the US (United States) participated. Participants were recruited via professional and personal contacts, primarily their midwives. the total 30-item BSS score mean was 128.98 (SD 16.92) and the 10-item BSS-R mean score was 31.94 (SD 6.75). Sub-scale mean scores quantified the quality of care provision, women's personal attributes, and stress experienced during labour. Satisfaction was higher for women with vaginal births compared with caesareans deliveries. In addition, satisfaction was higher for women who had both planned to deliver in a home or a birth centre, and who had actually delivered in a home or a birth center. total and subscale birth satisfaction scores were positive and high for the overall sample IMPLICATIONS FOR PRACTICE: the BSS and the BSS-R provide a robust tool to quantify women's experiences of childbirth between variables such as birth types, birth settings and providers. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  8. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE.

  9. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

  10. A Multi-Year Plan for Enhancing Turbulence Modeling in Hydra-TH Revised and Updated Version 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Thomas M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Berndt, Markus [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Magolan, Ben [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2015-10-01

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled for completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.

  11. Site study plan for EDBH (Engineering Design Boreholes) seismic surveys, Deaf Smith County site, Texas: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hume, H.

    1987-12-01

    This site study plan describes seismic reflection surveys to run north-south and east-west across the Deaf Smith County site, and intersecting near the Engineering Design Boreholes (EDBH). Both conventional and shallow high-resolution surveys will be run. The field program has been designed to acquire subsurface geologic and stratigraphic data to address information/data needs resulting from Federal and State regulations and Repository program requirements. The data acquired by the conventional surveys will be common-depth- point, seismic reflection data optimized for reflection events that indicate geologic structure near the repository horizon. The data will also resolve the basement structure and shallow reflection events up to about the top of the evaporite sequence. Field acquisition includes a testing phase to check/select parameters and a production phase. The field data will be subjected immediately to conventional data processing and interpretation to determine if there are any anamolous structural for stratigraphic conditions that could affect the choice of the EDBH sites. After the EDBH's have been drilled and logged, including vertical seismic profiling, the data will be reprocessed and reinterpreted for detailed structural and stratigraphic information to guide shaft development. The shallow high-resulition seismic reflection lines will be run along the same alignments, but the lines will be shorter and limited to immediate vicinity of the EDBH sites. These lines are planned to detect faults or thick channel sands that may be present at the EDBH sites. 23 refs. , 7 figs., 5 tabs.

  12. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  13. Surgical scar revision: An overview

    Directory of Open Access Journals (Sweden)

    Shilpa Garg

    2014-01-01

    Full Text Available Scar formation is an inevitable consequence of wound healing from either a traumatic or a surgical intervention. The aesthetic appearance of a scar is the most important criteria to judge the surgical outcome. An understanding of the anatomy and wound healing along with experience, meticulous planning and technique can reduce complications and improve the surgical outcome. Scar revision does not erase a scar but helps to make it less noticeable and more acceptable. Both surgical and non-surgical techniques, used either alone or in combination can be used for revising a scar. In planning a scar revision surgeon should decide on when to act and the type of technique to use for scar revision to get an aesthetically pleasing outcome. This review article provides overview of methods applied for facial scar revision. This predominantly covers surgical methods.

  14. The role of responsible gambling strategy and gambling passion in the online gamblers' decision-making process: revising the theory of planned behavior.

    Science.gov (United States)

    Lee, Jaeseok; Chen, Chih-Chien; Song, Hak-Jun; Lee, Choong-Ki

    2014-06-01

    This study revised the theory of planned behavior (TPB) by incorporating the new concepts of gambling passion and responsible gambling strategy (RGS) to predict gamblers' intention to gamble in online sports betting. The data were collected at the end of March in 2012 through an online gambling website. The findings indicated that the inclusion of two types of gambling passion and two types of RGS explains online gambling intention well. Specifically, out of the original antecedent predictors of TPB, attitude toward online gambling was positively related to harmonious passion. Subjective norm had a positive relationship with both harmonious and obsessive passion. The results also showed that perceived behavioral control does not have a significant effect on the two gambling passions but has a direct and significant influence on behavioral intention. Additionally, the compulsory RGS had a negative effect on obsessive passion, whereas supplementary RGS had concurrent positive impacts on harmonious and obsessive passion. Lastly, the two gambling passions were notable predictors of behavioral intention toward online sports betting.

  15. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2009-04-01

    Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  16. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  17. Plan for fully decontaminating and decommissioning of the Westinghouse Advanced Reactors Division Fuel Laboratories at Cheswick, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The project scope of work included the complete decontamination and decommissioning (D and D) of the Westinghouse ARD Fuel Laboratories at the Cheswick Site in the shortest possible time. This has been accomplished in the following four phases: (1) preparation of documents and necessary paperwork; packaging and shipping of all special nuclear materials in an acceptable form to a reprocessing agency; (2) decontamination of all facilities, glove boxes and equipment; loading of generated waste into bins, barrels and strong wooden boxes; (3) shipping of all bins, barrels and boxes containing waste to the designated burial site; removal of all utility services from the laboratories; (4) final survey of remaining facilities and certification for nonrestricted use; preparation of final report. This volume contains the following 3 attachments: (1) Plan for Fully Decontamination and Decommissioning of the Westinghouse Advanced Reactors Division Fuel Laboratories at Cheswick; (2) Environmental Assessment for Decontamination and Decommissioning the Westinghouse Advanced Reactors Division Plutonium Fuel Laboratories, Cheswick, PA; and (3) WARD-386, Quality Assurance Program Description for Decontamination and Decommissioning Activities.

  18. FFTF operations procedures preparation guide. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3.

  19. Streamlined Approach for (SAFER) Plan for Corrective Action Unit 566: E-MAD Compound, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 566, EMAD Compound, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 566 comprises the following corrective action site (CAS) located in Area 25 of the Nevada Test Site: • 25-99-20, EMAD Compound This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 25-99-20. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 566 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of a corrective action of clean closure will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The data quality objective (DQO) strategy for CAU 566 was developed at a meeting on April 30, 2009, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 566. The following text summarizes the SAFER activities that will

  20. Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2012-05-01

    Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed

  1. Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Revision 1)

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-07-01

    This Corrective Action Investigation Plan (CAIP) has been developed for Frenchman Flat Corrective Action Unit (CAU) 98. The Frenchman Flat CAU is located along the eastern border of the Nevada Test Site (NTS) and includes portions of Areas 5 and 11. The Frenchman Flat CAU constitutes one of several areas of the Nevada Test Site used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. The CAIP describes the Corrective Action Investigation (CAI) to be conducted at the Frenchman Flat CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The Frenchman Flat CAI will be conducted by the Underground Test Area (UGTA) Project which is a part of the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Environmental Restoration Project. The CAIP is a requirement of the Federal Facility Agreement and Consent Order (FFACO) (1996 ) agreed to by the U.S. Department of Energy (DOE), the Nevada Division of Environmental Protection (NDEP), and the U.S. Department of Defense (DoD). Based on the general definition of a CAI from Section IV.14 of the FFACO, the purpose of the CAI is ''...to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities...'' (FFACO, 1996). However, for the Underground Test Area (UGTA) CAUs, ''...the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use.'', as stated in Appendix VI of the FFACO (1996). According to the UGTA strategy (Appendix VI of the FFACO), the CAI of a given CAU starts with the evaluation of the existing data. New

  2. Revising Translations

    DEFF Research Database (Denmark)

    Rasmussen, Kirsten Wølch; Schjoldager, Anne

    2011-01-01

    out by specialised revisers, but by staff translators, who revise the work of colleagues and freelancers on an ad hoc basis. Corrections are mostly given in a peer-to-peer fashion, though the work of freelancers and inexperienced in-house translators is often revised in an authoritative (nonnegotiable......) way. Most respondents and interviewees are worried about increasing pressures on the translation market, which, combined with customers’ general lack of understanding of the translation process, mean that systematic, all-encompassing quality assurance is rarely financially viable....

  3. Ethical Revision.

    Science.gov (United States)

    Jackman, Mary Kathryn

    1994-01-01

    Discusses the dilemma of how to respond to student papers advancing morally repugnant positions. Advocates conceptualizing writing as an ethical act and connecting ethics and revision. Describes briefly how three such student papers were handled. (SR)

  4. Scar revision

    Science.gov (United States)

    ... chap 21. Lorenz P, Bari AS. Scar prevention, treatment, and revision. In: Neligan PC, ed. Plastic Surgery . 3rd ed. Philadelphia, PA: Elsevier; 2013:chap 16. Read More Contracture deformity Keloids Review Date 4/14/2015 Updated ...

  5. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-12-01

    -closure-posting requirements for the mounded/capped basement structure, as well as for the entire CAU, are addressed in Section 4.2.10. The site contains radiologically impacted surfaces and hazardous materials. Based on review of the historical information for CAU 116 and recent site inspections, there is sufficient process knowledge to close CAU 116 using the SAFER process. CAUs that may be closed using the SAFER process have conceptual corrective actions that are clearly identified. Consequently, corrective action alternatives can be chosen prior to completing a corrective action investigation, given anticipated investigation results. The SAFER process combines elements of the data quality objective (DQO) process and the observational approach to plan and conduct closure activities. The DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the SAFER process. The purpose of the investigation phase is to verify the adequacy of existing information used to determine the chosen corrective action. The observational approach provides a framework for managing uncertainty during the planning and decision-making phases of the project. The SAFER process allows for technical decisions to be made based on information gathered during site visits, interviews, meetings, research, and a consensus of opinion by the decontamination and decommissioning (D&D) team members. Any uncertainties are addressed by documented assumptions that are verified by sampling and analysis, data evaluation, onsite observations, and contingency plans, as necessary. Closure activities may proceed simultaneously with site characterization as sufficient data are gathered to confirm or disprove the assumptions made during selection of the corrective action. If, at any time during the closure process, new information is discovered that indicates that closure activities should be revised, closure activities will be reevaluated as appropriate. Based on a detailed

  6. 36 CFR 219.9 - Revision.

    Science.gov (United States)

    2010-07-01

    ... Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning The Framework for Planning § 219.9 Revision. (a) Application... is a review of the overall management of a unit of the National Forest System and an opportunity...

  7. My revision notes Edexcel GCSE computer science

    CERN Document Server

    Cushing, Steve

    2015-01-01

    Unlock your full potential with this revision guide which focuses on the key content and skills you need to know. With My Revision Notes for AQA GCSE Computer Science, which perfectly matches the latest examined elements of the course, you can: - Take control of your revision: plan and focus on the areas you need to revise, with advice, summaries and notes from author Steve Cushing - Show you fully understand key topics by using specific strategies and theories to add depth to your knowledge of programming and computing issues and processes - Apply programming and com

  8. My revision notes AQA GCSE English Language

    CERN Document Server

    Brindle, Keith

    2015-01-01

    Unlock your full potential with this revision guide for the new AQA GCSE English Language which focuses on the key content and skills you need to know. -Take control of your revision: plan and focus on the areas you need to revise. -Improve your exam skills with self-testing and exam-style questions. -Keep focused on what you need to know with Key Terms based around the exam questions. -Unpick each exam question with guidance on how to approach them and specific Revision Tasks

  9. 30 CFR 285.617 - What activities require a revision to my SAP, and when will MMS approve the revision?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What activities require a revision to my SAP... OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Sap § 285.617 What activities require a revision to my SAP, and when will MMS approve the revision? (a) You must...

  10. Admissible and Restrained Revision

    CERN Document Server

    Booth, R; 10.1613/jair.1874

    2011-01-01

    As partial justification of their framework for iterated belief revision Darwiche and Pearl convincingly argued against Boutiliers natural revision and provided a prototypical revision operator that fits into their scheme. We show that the Darwiche-Pearl arguments lead naturally to the acceptance of a smaller class of operators which we refer to as admissible. Admissible revision ensures that the penultimate input is not ignored completely, thereby eliminating natural revision, but includes the Darwiche-Pearl operator, Nayaks lexicographic revision operator, and a newly introduced operator called restrained revision. We demonstrate that restrained revision is the most conservative of admissible revision operators, effecting as few changes as possible, while lexicographic revision is the least conservative, and point out that restrained revision can also be viewed as a composite operator, consisting of natural revision preceded by an application of a "backwards revision" operator previously studied by Papini. ...

  11. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume I. Summary, objectives and management. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1982-08-01

    This document defines a plan for conducting selected aspects of the engineering testing required for magnetic fusion reactor FWBS components and systems. The ultimate product of this program is an established data base that contributes to a functional, reliable, maintainable, economically attractive, and environmentally acceptable commercial fusion reactor first wall, blanket, and shield system. This program plan updates the initial plan issued in November of 1980 by the DOE/Office of Fusion Energy (unnumbered report). The plan consists of two parts. Part I is a summary of activities, responsibilities and program management including reporting and interfaces with other programs. Part II is a compilation of the Detailed Technical Plans for Phase I (1982 to 1984) developed by the participants during Phase 0 of the program (July to December 1981).

  12. ACL Revision

    Science.gov (United States)

    Costa-Paz, Matias; Dubois, Julieta Puig; Zicaro, Juan Pablo; Rasumoff, Alejandro; Yacuzzi, Carlos

    2017-01-01

    Objectives: The purpose of this study was to evaluate a series of patients one year after an ACL revision with clinical evaluation and MRI, to consider their condition before returning to sports activities. Methods: A descriptive, prospective and longitudinal study was performed. A series of patients who underwent an ACL revision between March 2014 and March 2015 were evaluated after one year post surgery. They were evaluated using the Lysholm score, IKDC, Tegner, artrometry and MRI (3.0 t). A signal pattern and osteointegration was determined in the MRI. Graft signal intensity of the ACL graft using the signal/noise quotient value (SNQ) was also determined to evaluate the ligamentatization process state. Results: A total of 18 male patients were evaluated with a mean age of 31 years old.Average scores were: Lysholm 88 points, IKDC 80 points, Pre-surgical Tegner 9 points and postoperative 4 points. Artrhometry (KT1000) at 20 newtons showed a side to side difference of less than 3 mm in 88%. Only 44% of patients returned to their previous sport activity one year after revision.The MRI showed a heterogeneous signal in neoligaments in 34% of patients. SNQ showed graft integration in only 28%. Synovial fluid was found in bone-graft interphase in 44% of tunnels, inferring partial osteointegration. The heterogeneous signal was present in 50% of patients who did not return to the previous sport level activity. (Fisher statistics: p = 0.043) There were no meaningful differences in patients with auto or allografts. Conclusion: Although the clinical evaluation was satisfactory, only 44% of patients returned to the previous level of sport activity one year after the ACL surgery. The ligamentatization process was found in 28% of knees evaluated with MRI one year later. Partial osteointegration is inferred in 44%. Results showed a meaningful relation between the signal of neoligaments in the MRI and the return to sport activity in said series of patients. MRI is a useful tool

  13. My revision notes AQA A-level physics

    CERN Document Server

    Gibbs, Keith

    2017-01-01

    With My Revision Notes: AQA A Level Physics you can:- Manage your own revision with step-by-step support from experienced teacher and examiner Keith Gibbs- Apply biological terms accurately with the help of definitions and key words- Plan and pace your revision with the revision planner- Test understanding with questions throughout the book- Get exam ready with last minute quick quizzes available on the Hodder Education website

  14. IDC Integrated Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  15. Science and Math Lesson Plans to Meet the Ohio Revised Science Standards and the Next Generation of Standards for Today; Technology (Excel

    Directory of Open Access Journals (Sweden)

    Suzanne Lunsford

    2015-02-01

    Full Text Available Pre-service teachers (K-12 developed and taught lesson plans that met the state and national science and technology standards by integrating Excel and PowerPoint into their lesson. A sample of 74 pre-service teachers in our science education program were required to integrate technology (Excel as they developed science and math lesson plans with graphing as a requirement. These students took pre-test and post-test (n=74 to determine their understanding of Excel in relation to the need of current technology for todays' science classroom. The test results showed that students obtained content gains in Excel graphing in all the inquiry-based lab experiments. They also gained experience in developing math skills, inquiry-based science lesson plans, and communication and presentation skills.

  16. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (Draft), Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2007-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for Corrective Action Unit (CAU) 124, Areas 8, 15, and 16 Storage Tanks, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 124 consists of five Corrective Action Sites (CASs) located in Areas 8, 15, and 16 of the Nevada Test Site as follows: • 08-02-01, Underground Storage Tank • 15-02-01, Irrigation Piping • 16-02-03, Underground Storage Tank • 16-02-04, Fuel Oil Piping • 16-99-04, Fuel Line (Buried) and UST This plan provides the methodology of field activities necessary to gather information to close each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 124 using the SAFER process.

  18. Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Davis, C. M.; El-Messidi, O. E.; Cowser, D. K.; Kannard, J. R.; Carvin, R. T.; Will, III, A. S.; Clark, Jr., C.; Garland, S. B.

    1993-05-01

    This Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES&H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES&H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements.

  19. 77 FR 11974 - Approval and Promulgation of Implementation Plans; State of Iowa Regional Haze State...

    Science.gov (United States)

    2012-02-28

    ... revision. Processing of State Implementation Plan (SIP) Revisions, EPA Memorandum from John Calcagni...). Hercules Glades Wilderness Area, Missouri (HEGL). Mingo Wilderness Area, Missouri (MING). Caney...

  20. Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-09-01

    Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU

  1. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  2. Corrective Action Investigation Plan for Corrective Action Unit 545: Dumps, Waste Disposal Sites, and Buried Radioactive Materials Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Wickline, Alfred

    2007-06-01

    Corrective Action Unit 545, Dumps, Waste Disposal Sites, and Buried Radioactive Materials, consists of seven inactive sites located in the Yucca Flat area and one inactive site in the Pahute Mesa area. The eight CAU 545 sites consist of craters used for mud disposal, surface or buried waste disposed within craters or potential crater areas, and sites where surface or buried waste was disposed. The CAU 545 sites were used to support nuclear testing conducted in the Yucca Flat area during the 1950s through the early 1990s, and in Area 20 in the mid-1970s. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval.

  3. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: • 15-19-02, Waste Burial Pit • 15-30-01, Surface Features at Borehole Sites • 15-64-01, Decontamination Area • 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  4. Streamlined approach for environmental restoration (SAFER) plan for corrective action unit 412: clean slate I plutonium dispersion (TTR) tonopah test range, Nevada, revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K.

    2015-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 412. CAU 412 is located on the Tonopah Test Range and consists of a single corrective action site (CAS), TA-23-01CS, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1997 interim corrective action to recommend closure of CAU 412 using the SAFER process. Based on existing data, the presumed corrective action for CAU 412 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information and determine whether the CAU 412 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU.The following summarizes the SAFER activities that will support the closure of CAU 412:• Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information.• If no COCs are present, establish clean closure as the corrective action. • If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF).• Confirm the preferred closure option is sufficient to protect human health and the environment.

  5. Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2009-02-01

    dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  6. Corrective Action Investigation Plan for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, Bernadine; Matthews, Patrick

    2013-07-01

    CAU 571 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 571, which comprises the following corrective action sites (CASs): • 09-23-03, Atmospheric Test Site S-9F • 09-23-04, Atmospheric Test Site T9-C • 09-23-12, Atmospheric Test Site S-9E • 09-23-13, Atmospheric Test Site T-9D • 09-45-01, Windrows Crater These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on March 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (now the Nevada Field Office). The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 571. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 571 CASs are from nuclear testing activities. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary exceeds the final action level (FAL) and requires corrective action. The presence and nature of contamination outside the default

  7. Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-01-01

    CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.

  8. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff`s review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission`s regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements.

  9. Technical Work Plan For: Calculation of Waste Packave and Drip Shield Response to Vibratory Ground Motion and Revision of the Seismic Consequence Abstraction

    Energy Technology Data Exchange (ETDEWEB)

    M. Gross

    2006-12-08

    The overall objective of the work scope covered by this technical work plan (TWP) is to develop new damage abstractions for the seismic scenario class in total system performance assessment (TSPA). The new abstractions will be based on a new set of waste package and drip shield damage calculations in response to vibratory ground motion and fault displacement. The new damage calculations, which are collectively referred to as damage models in this TWP, are required to represent recent changes in waste form packaging and in the regulatory time frame. The new damage models also respond to comments from the Independent Validation Review Team (IVRT) postvalidation review of the draft TSPA model regarding performance of the drip shield and to an Additional Information Need (AIN) from the U.S. Nuclear Regulatory Commission (NRC).

  10. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 • 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

  11. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Nevada Site Office, Las Vegas, NV (United States)

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  12. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions

  13. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Pat Matthews

    2007-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.

  14. Corrective Action Investigation Plan for Corrective Action Unit 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada, with ROTC 1 Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K.

    2013-07-01

    Corrective Action Unit (CAU) 567 is located in Areas 1, 3, 5, 20, and 25 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 567 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 567, which comprises the following corrective action sites (CASs): • 01-23-03, Atmospheric Test Site T-1 • 03-23-25, Seaweed E Contamination Area • 05-23-07, A5b RMA • 20-23-08, Colby Mud Spill • 25-23-23, J-11 Soil RMA These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on May 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 567. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 567 releases are nuclear test operations and other NNSS operations. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary

  15. Exploration of the System of the Revision of the Master Plan:A Case Study of the Urban-rural Overall Planning of Chongqing%总体规划修改的制度化探索--以重庆市城乡总体规划为例

    Institute of Scientific and Technical Information of China (English)

    王岳; 罗江帆

    2013-01-01

      传统基于技术理性的蓝图式总体规划难以适应经济社会快速发展的要求,《重庆市城乡总体规划(2007-2020年)》(2011年修订)探索实践了《城乡规划法》和《城市总体规划修改工作规则》规定的修改程序。增强总体规划的适应性,需要建立动态完善总体规划的机制、加强多层级多部门的协调合作、空间与政策并重,加强对城市宏观发展趋势的把握。%The traditional master planning based on technical ration is difficult to adapt the rapid development. The Urban-rural Overal Planning of Chongqing (revised edition, 2011) has explored the modification procedure which is set up by Urban and Rural Planning Law of the People’s Republic of China and Working Regulation of Modification of City Overal Planning. In order to enhance the adaptability of overall planning, we need to build mechanism of dynamic modification, strengthen cooperation between multi-levels and multi-departments, reconcile spatial development and policies, and grasp macro-trend of a city’s development.

  16. Corrective Action Investigation Plan for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-08-01

    CAU 570 comprises the following six corrective action sites (CASs): • 02-23-07, Atmospheric Test Site - Tesla • 09-23-10, Atmospheric Test Site T-9 • 09-23-11, Atmospheric Test Site S-9G • 09-23-14, Atmospheric Test Site - Rushmore • 09-23-15, Eagle Contamination Area • 09-99-01, Atmospheric Test Site B-9A These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 570. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The presence and nature of contamination at CAU 570 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological

  17. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-05-01

    This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and

  18. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  19. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-03-01

    This Streamlined Approach for Environmental Restoration Plan addresses the actions needed to achieve closure of Corrective Action Unit (CAU) 408, Bomblet Target Area (TTR). Corrective Action Unit 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. Corrective Action Unit 408 comprises Corrective Action Site TA-55-002-TAB2, Bomblet Target Areas. Clean closure of CAU 408 will be accomplished by removal of munitions and explosives of concern within seven target areas and potential disposal pits. The target areas were used to perform submunitions related tests for the U.S. Department of Energy (DOE). The scope of CAU 408 is limited to submunitions released from DOE activities. However, it is recognized that the presence of other types of unexploded ordnance and munitions may be present within the target areas due to the activities of other government organizations. The CAU 408 closure activities consist of: • Clearing bomblet target areas within the study area. • Identifying and remediating disposal pits. • Collecting verification samples. • Performing radiological screening of soil. • Removing soil containing contaminants at concentrations above the action levels. Based on existing information, contaminants of potential concern at CAU 408 include unexploded submunitions, explosives, Resource Conservation Recovery Act metals, and depleted uranium. Contaminants are not expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results.

  20. Corrective Action Investigation Plan for Corrective Action Unit 576: Miscellaneous Radiological Sites and Debris Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2016-12-01

    Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24 (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).

  1. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ... Federal Energy Regulatory Commission 18 CFR Part 376 Continuity of Operations Plan AGENCY: Federal Energy... Continuity of Operations Plan regulations to revise its hierarchy of delegation of Commission authority... Rule revises the Commission's Continuity of Operations Plan (COOP) regulations to incorporate...

  2. Loosening After Acetabular Revision

    DEFF Research Database (Denmark)

    Beckmann, Nicholas A.; Weiss, Stefan; Klotz, Matthias C.M.;

    2014-01-01

    The best method of revision acetabular arthroplasty remains unclear. Consequently, we reviewed the literature on the treatment of revision acetabular arthroplasty using revision rings (1541 cases; mean follow-up (FU) 5.7 years) and Trabecular Metal, or TM, implants (1959 cases; mean FU 3.7 years)...

  3. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham and Sam Marutzky

    2011-07-01

    This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flat CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking

  4. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, with ROTC 1, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-11-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 465, Hydronuclear, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 465 comprises the following four corrective action sites (CASs) located in Areas 6 and 27 of the Nevada National Security Site: (1) 00-23-01, Hydronuclear Experiment; (2) 00-23-02, Hydronuclear Experiment; (3) 00-23-03, Hydronuclear Experiment; (4) 06-99-01, Hydronuclear. The sites will be investigated based on the data quality objectives (DQOs) developed on July 6, 2011, by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 465. For CAU 465, two potential release components have been identified. The subsurface release component includes potential releases of radiological and nonradiological contaminants from the subsurface hydronuclear experiments and disposal boreholes. The surface release component consists of other potential releases of radiological and nonradiological contaminants to surface soils that may have occurred during the pre- and post-test activities. This plan provides the methodology for collection of the necessary information for closing each CAS component. There is sufficient information and process knowledge from historical documentation, contaminant characteristics, existing regional and site groundwater models, and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 465 using the SAFER process. For potential subsurface releases, flow and transport models will be developed to integrate existing data into a conservative

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies

  6. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Burmeister

    2009-08-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada Test Site: • 25-41-03, EMAD Facility • 25-99-20, EMAD Facility Exterior Releases This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. It is anticipated that the results of the field investigation and implementation of a corrective action of clean closure will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data

  7. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  8. Corrective Action Investigation Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada (December 2002, Revision No.: 0), Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NSO

    2002-12-12

    The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations

  9. Corrective Action Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0 with ROTC 1

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro Nevada Environmental Services, NV (United States); Burmeister, Mark [Navarro Nevada Environmental Services, NV (United States)

    2016-05-01

    The purpose of this CAP is to provide the plan for implementation of the recommended corrective action alternatives (CAAs) for CAU 568. Site characterization activities were performed in 2014, and the results are presented in Appendix A of the CAU 568 CADD. The CAAs were recommended in the CADD. The scope of work required to implement the recommended CAAs of closure in place and clean closure at 11 of the 14 CASs includes the following: The installation of physical barriers over the nine safety experiment ground zeroes to cover contamination at CASs 03-23-20 (Otero), 03-23-23 (San Juan and Pascal-C), 03-23-31 (Pascal-B, Luna, Colfax), 03-23-32 (Pascal-A), 03-23-33 (Valencia), and 03-23-34 (Chipmunk); the characterization and removal of three soil and debris piles at CAS 03-08-04, and one HCA soil pile at CAS 03-23-30; the removal of three steel well head covers (PSM) from CASs 03-23-20 (Otero), 03-23-31 (Luna), and 03-23-33 (Valencia); the removal of soil and lead PSM from two locations at CAS 03-26-04; Implementation of FFACO use restrictions at nine safety experiment ground zeroes at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; the steel well head cover at CAS 03-23-23; the areas meeting HCA conditions at CASs 03-23-19 and 03-23-31; and the Boomer crater area at CAS 03-45-01. The FFACO use restriction boundaries will be presented in the CAU 568 closure report.

  10. Idiopathic interstitial pneumonias: Classification revision

    Directory of Open Access Journals (Sweden)

    Demosthenes Bouros MD, PhD, FCCP

    2010-01-01

    Full Text Available The American Thoracic Society (ATS, the European Respiratory Society (ERS and the Japan Respiratory Society (JRS are planning a revision of the 2002 ATS/ERS International Multidisciplinary Classification of Idiopathic Interstitial Pneumonias (IIPs1. In two years’ time it will be 10 years since its publication and with a view to publishing the revision after 10 years (i.e., in 2012, a steering committee has been established, which met in New Orleans during ATS congress in May 2010 and more recently in Barcelona during the ERS congress (Photo. The committee will meet again during the ATS and the ERS congresses that will be held in the next two years, with an additional meeting in Modena, Italy, in Αpril 2011.

  11. 75 FR 17253 - Revisions to the General Conformity Regulations

    Science.gov (United States)

    2010-04-05

    ... Protection Agency 40 CFR Parts 51 and 93 Revisions to the General Conformity Regulations; Final Rule #0;#0... PROTECTION AGENCY 40 CFR Parts 51 and 93 RIN 2060-AH93 Revisions to the General Conformity Regulations AGENCY... or Federal implementation plan (SIP, TIP, or FIP) for attaining clean air (``General...

  12. Corrective Action Investigation Plan for Corrective Action Unit 410: Waste Disposal Trenches, Tonopah Test Range, Nevada, Revision 0 (includes ROTCs 1, 2, and 3)

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NV

    2002-07-16

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL, Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted

  13. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible

  14. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of

  15. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2001-08-21

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, as identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site in Nevada, consists of seven Corrective Action Sites (CASs): CAS 03-04-01, Area 3 Change House Septic System; CAS 03-09-01, Mud Pit Spill Over; CAS 03-09-03, Mud Pit; CAS 03-09-04, Mud Pit; CAS 03-09-05, Mud Pit; CAS 20-16-01, Landfill; CAS 20-22-21, Drums. Sufficient information and process knowledge from historical documentation and investigations are the basis for the development of the phased approach chosen to address the data collection activities prior to implementing the preferred closure alternative for each CAS. The Phase I investigation will determine through collection of environmental samples from targeted populations (i.e., mud/soil cuttings above textural discontinuity) if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels (PALs) at each of the CASs. If COPCs are present above PALs, a Phase II investigation will be implemented to determine the extent of contamination to support the appropriate corrective action alternative to complete closure of the site. Groundwater impacts from potentially migrating contaminants are not expected due to the depths to groundwater and limiting hydrologic drivers of low precipitation and high evaporation rates. Future land-use scenarios limit future uses to industrial activities; therefore, future residential uses are not considered. Potential exposure routes to site workers from contaminants of concern in septage and soils include oral ingestion, inhalation, or dermal contact (absorption) through in-advertent disturbance of contaminated structures and/or soils. Diesel within drilling muds is expected to be the primary COPC based on process

  16. My revision notes AQA GCSE computer science computing fundamentals

    CERN Document Server

    Cushing, Steve

    2013-01-01

    Unlock your full potential with this revision guide which focuses on the key content and skills you need to know. With My Revision Notes for AQA GCSE Computer Science, which perfectly matches the latest examined elements of the course, you can:. - Take control of your revision: plan and focus on the areas you need to revise, with advice, summaries and notes from author Steve Cushing. - Show you fully understand key topics by using specific strategies and theories to add depth to your knowledge of programming and computing issues and processes. - Apply programming and computing terms accurately

  17. Operation STEADFAST Phased Implementation Plan. Revised

    Science.gov (United States)

    1973-02-28

    i i <M• ~ · 1 fruL 𔃻 . roj rOJ<s: ~lo •’!"Cl ~ { : [ [ rt-t-t::t:±±:±:::t~!!:±:: ( HijO 1 JuL 7~ • TO~ 1ə fm<, Ml l I : ! i i...34As’l· Fomt No ., 2 (OT) IRA ftfFtRin’ Jlfif ANIV 1’ lL’\\DOC 0 rORSCON Q . CONUSA 0 (s·pecify) · CEN’!’ER Cl ;.i ’. . ,. OTl{ER pg ~·-· (!’:pccity

  18. Illinois energy conservation plan report: 1979 revision

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-01

    In response to Energy Policy and this Conservation Act (PL 94-163) and Energy Conservation and Production Act (PL 94-385), this paper describes the activities to be undertaken by Illinois to meet the mandatory requirements of the Acts and to carry out other activities to encourage energy conservation by energy-consuming sectors in the state. Programs reach the residential, commercial/industrial, agricultural, educational, transportation, and government sectors. The overall goal of the program is to reduce projected energy consumption in 1980 by 5% through information and educational activities.

  19. National Airspace Review. Implementation Plan. Revised.

    Science.gov (United States)

    1985-01-01

    NAR organizational structure consists of: a comprehensive analisis of specific dernands an Executive Steering Committee (EXCOM), currently mnade on...VORTAC TCA Oesign Criteria I Instrument Flight Rules Routes r I * I ____________ _____________ Figure 2-2 Change I 2-4 January 1985 TERMINAL SYSTEM...Minima on Standard Instrument DeparturesS n I d - d i - I Obsta.cle Depiction Criteriaj Terminal Publication Contonts- 1 I I - - -,! (Figure 4-3 Change 1

  20. 76 FR 19893 - Unified Command Plan 2011

    Science.gov (United States)

    2011-04-08

    ...#0;#0; ] Memorandum of April 6, 2011 Unified Command Plan 2011 Memorandum for the Secretary of... the revised Unified Command Plan. Consistent with title 10, United States Code, section 161(b)(2)...