WorldWideScience

Sample records for plan sakusei chugoku

  1. New energy introduction guidebook for Chugoku area; Shin energy donyu guidebook. Chugoku chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-05

    A guidebook was edited for the purpose of assisting introduction of new energies. Sections consist of Section 1, new energies available in the Chugoku area; Section 2, procedure for new energy introduction; Section 3, assistance institutions by energy; and Section 4, the status of new energy introduction in the Chugoku area, the future introduction targets, and referential materials. Section 1, upon defining the new energies, summarized features of photovoltaic power generation, solar heat utilization, wind power generation, wastes power generation, cogeneration, fuel cells, clean energy fueled automobiles, and introduction records up to the year 2000. Section 2 summarizes the general roles of local governments in the introduction, processing procedures for individual programs, related regulations, and summary of the assistance institutions. Section 3 puts into order the assistance institutions by energy. Section 4 summarizes precautions, targets and records in introduction by each new energy. The referential materials include a list of the Japanese assistance institutions, and subsidy institutions related to new energies for local governments in the Chugoku area. (NEDO)

  2. Alteration in reactor installation (addition of Unit 2) in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. (inquiry)

    International Nuclear Information System (INIS)

    1983-01-01

    An inquiry was made by the Ministry of International Trade and Industry to Nuclear Safety Commission on the addition of Unit 2 in Shimane Nuclear Power Station of The Chugoku Electric Power Co., Inc., concerning the technical capability of Chugoku Electric Power Co., Inc., and the plant safety. The NSC requested the Committee on Examination of Reactor Safety to make a deliberation on this subject. Both the technical capability and the safety of Unit 1 were already confirmed by MITI. Unit 2 to be newly added in the Shimane Nuclear Power Station is a BWR power plant with electric output of 820 MW. The examination made by MITI is described: the technical capability of Chugoku Electric Power Co., Inc., the safety of Unit 2 about its siting, reactor proper, reactor cooling system, radioactive waste management, etc. (J.P.N.)

  3. Receiver function images of the central Chugoku region in the Japanese islands using Hi-net data

    Science.gov (United States)

    Ramesh, D. S.; Wakatsu, H. K.; Watada, S.; Yuan, X.

    2005-04-01

    Crustal configuration of the central Chugoku region with disposition of the Philippine Sea Plate (PHS) in this area are investigated through the receiver function approach using short-period Hi-net data. Images of the upper mantle discontinuities are also obtained. Restituted short-period receiver functions bring out discernible variations in average composition of the crust and its thickness in the study region. The Vp/ Vs values in the study area are generally high, reaching values in excess of 1.85 at a few places. The central part of the study region showing the highest Vp/ Vs values is coincidentally a subregion of least seismicity, possibly bestowed with special subsurface structure. Migrated receiver function images, both Ps and Pps images, unambiguously trace the NW subducting PHS taking a steeper plunge in the northwest part of the Chugoku region reaching depths of 70 km from its low dip disposition in the southeast. An excellent correlation of the subducting PHS with the hypocenters is also seen. We demonstrate that short-period data after restitution and application of appropriate low pass filters can indeed detect presence of the global 410-km and 660-km discontinuities and map their disposition reasonably well. Our migrated receiver functions image the deflections in the 410-km and 660-km discontinuities in an anti-correlated fashion on expected lines of Clapeyron slope predictions induced by subduction of the Pacific plate (PAC) beneath Japanese islands, though PAC itself is feebly traced but shows good correlation with slab seismicity.

  4. Evaluation of the quality of CR mammography images in Chugoku Rosai Hospital. Visual evaluation and digital evaluation

    International Nuclear Information System (INIS)

    Makihata, Hiroshi; Fukuda, Tomoya; Aomori, Masaji; Hara, Shinji

    2005-01-01

    New mammography system (50-micrometer system) composed of Fuji computed tomography (FCR) both sides IP, 5000MA and dry imager was introduced in the Department of Physical Checkup of Chugoku Rosai Hospital in 2003. We performed visual evaluation and digital evaluation using 50-micrometer system in accordance with (the quality control guidance of) Non-Profit Organization the Central Committee on Quality Control of Mammographic Screening. In visual evaluation using RMI156 phantom the system cleared the quality control guidance about a fiber, calcification, and masses. On step phantom, it passed about 10 steps, masses, and calcifications. Since a success standard was not announced officially, the performance in digital evaluation cannot be judged and only the result is presented. In digital evaluation, signal-to-noise ratio (SNR) is 14.9, root of mean squares (RMS) is 32.9, SNRC is 16.4, SNRT is 3.65. This system image has high sharpness and is considered from the result in visual evaluation to have the ability of offering images with a high degree of information. (author)

  5. Treatment of opinions, etc. in the public hearing on the alteration of reactor installation (addition of Unit 2) in the Shimane Nuclear Power Station of The Chugoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1983-01-01

    The Nuclear Safety Commission has acknowledged the governmental policy, and further decided on the treatment of the opinions expressed by the local people in the public hearing held in May, 1983, in Shimane Prefecture on the addition of Unit 2 to the Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. The NSC has directed the Committee on Examination of Reactor Safety to take into consideration the opinions in its later examination. The opinions expressed by the local people in the form of question are given as follows: siting conditions (earthquake, ground, weather, etc.), the safety design for reactor installation (general aspect, aseismatic design, core design, ECCS, the teaching of TMI accident, etc.), radioactive wastes, radiation exposure, site evaluation. (Mori, K.)

  6. Fiscal 2000 survey report on rationalization project for international energy conservation. Preparation of master plan for rational energy consumption (Shanxi Province, China); 2000 nendo kokuasi energy shiyo gorika kiban seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei (Chugoku Shanxi sho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A comprehensive master plan for Shanxi Province was prepared jointly with China for the purpose of promoting rational use of energy and realizing an environmentally harmonious demand/supply structure of energy. This paper describes the fiscal 2000 results. The first phase refers to the surmounting of environmental problems incident to the use of coal and the restoration of regional economy. As countermeasures against air pollution in Taiyuan City, environmental measures were propagated such as simplified flue-gas desulfurization in thermal power plants, energy conservation in coke dry quenching, etc., and desulfurization of coke oven gas. Bio-briquette effective against smoke and soot pollution was carried out, as was general rubbish treatment (e.g., compost and coal/rubbish mixed combustion power generation). Promoted, by the opening of a clean coal center, were sulfur content reduction, coal briquette method, market expansion for CWM, etc. Producing city gas out of coal mine methane gas was also among the ideas considered. With the aim of attaining a Shanxi Province zero emission program, incentives are essential and, for this purpose, support by the national government is desirable including subsidies for investment, low-interest loans, tax deductions/exemptions, and yen-denominated loans from Japan. The second phase is intended for harmony with culture/science/nature, control of global warming and advanced utilization of coal. (NEDO)

  7. Research on elaboration of the action plan for the New Earth 21; `Chikyu saisei keikaku` no jisshi keikaku sakusei ni kansuru chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Elaboration of the action plan for the New Earth 21 plan proposed by Japan in Houston Summit was researched. In fiscal 1995 three types of energy supply/demand scenarios, sensitivity analysis under various conditions, and cases presupposing CO2 emission regulations or not were evaluated by analysis toward 2050 using the New Earth 21 Model (NE 21 Model). Energy-saving is important, and CO2 recovery/treatment technology is introduced according to CO2 emission regulations, while attention is focussed on biomass energy. The issue of solar and wind power generation is cost reduction. In a presupposed horizontally integrated energy system, methanol represents an important intermediate energy. As a whole, CO2 reduction can be achieved by various combinations of energy-saving, introduction of regenerative energy, and CO2 recovery/treatment technology. Case studies of the action plan were conducted by unifying the evaluation criterion on coal IGCC, photovoltaic generation and biomass. The NE 21 Model was useful for elaboration of the reduction scenarios of CO2 emission. 26 refs., 84 figs., 28 tabs.

  8. Comparative Assessment of Women Farmers' Status in Japan and ...

    African Journals Online (AJOL)

    The research compared the status of Japanese and Nigerian women farmers. The study was conducted in Sera Chuo, Hiroshima and Ohnan Chuo, Shimane prefecture, Chugoku region of Japan and Southwestern part of Nigeria covering three locations (Omi-Adio, Ijaye and Kila) within the suburban area of Ibadan ...

  9. Toru to Nukui dam construction carried out by Chugoku district construction department of Ministry of construction. Kensetsusho chugoku chiho kensetsukyoku Nukui dam koji kengakuki

    Energy Technology Data Exchange (ETDEWEB)

    Kitajima, E. (Chugoku Kayaku Co. Ltd. Hiroshima (Japan))

    1993-08-31

    This paper reports the summary of a tour to the Nukui dam being constructed on the Ota river system in Hiroshima Prefecture, as a study activity of the blasting expert working group. The Nukui dam has the second highest embankment in Japan (155 m). It adjusts flood at 1800 m[sup 3]/s from the planned high water discharge of 2900 m[sup 3]/s supplies water of 200,000 m[sup 3] daily at maximum, and generates electric power of 2300 kW as the maximum output. The blasting adopted a presplit system not to damage base rock beds, and was used with a bench height of 5 m, a hole diameter of 75 mm, a minimum shaft line of 2.5 m, and a hole distance of 2.8m. The main explosive used was the ANFO, No. 3 Kiri, Akatsuki dynamite. Slurry explosives were used for the presplit. Drilling machines with three-dimensional computers were used. The 'Nukui Dam Work Station' is the country's first site office/lodgings integrated facility offering as comfortable working environment as a city hotel. The facility is expected to wipe out the dirty, dangerous and hard image of construction work. 1 ref., 3 figs.

  10. Table of written agreements on securing safety of nuclear power plants (Saga, Shimane, Fukushima, Ehime, Miyagi, Ibaraki, Fukui and Shizuoka prefectures)

    International Nuclear Information System (INIS)

    1981-01-01

    A table collecting the written agreements concluded between local city, town and village offices, prefectural governments and the local nuclear enterprises on securing nuclear power safety is given, which was prepared by the study committee on local development and finance problems in Japan Atomic Industrial Forum, Inc. The prefectures, with each of which the agreement was concluded are Saga, Shimane, Fukushima, Ehime, Miyagi, Ibaraki, Fukui and Shizuoka. The local nuclear enterprises are Kyushu, Chugoku, Tokyo, Shikoku, Tohoku, Chubu and Kansai Electric Power Companies, Japan Atomic Power Company, Japan Atomic Energy Research Institute, Power Reactor and Nuclear Fuel Development Corporation, etc. The contents of the agreements are as follows: radioactive waste and material control, understanding in advance of plans, environmental radioactivity measurement, presentation of measured results, hazard countermeasures, communication in normal plant operation and others, on the spot inspection, damage compensation, etc. (J.P.N.)

  11. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  12. A Descriptive Overview of Japanese Shipbuilding Surface Preparation and Coating Methods

    Science.gov (United States)

    1982-09-01

    INORGANIC SHOP PRIMER I Materials I Weight BASE PASTE Total Alkyl-silicate Catalyst Alcohol Special organic resin Tinting pigment Anti-sagging agent... Alcohol Zinc powder 32.0 2.0 6.0 0.5 8.0 40.0 100.0 Shop Primer Composition (Courtesy of Chugoku Marine Paints 51 Limited) 4.2.1 Shop Primer...at a pH of 10 is added to minimize the oxydizing reactions which lead to salt formation and adhesion failure. “Galvanite” is the trade name for the

  13. Which characteristic of Natto: appearance, odor, or taste most affects preference for Natto

    OpenAIRE

    Tsumura, Yuki; Ohyane, Aki; Yamashita, Kuniko; Sone, Yoshiaki

    2012-01-01

    Abstract Background In Japan, consumption of Natto, a fermented bean dish, is recommended because of its high quality protein, digestibility in the gut and its preventive effect on blood clot formation due to high vitamin K content. However, consumption of Natto in Kansai and the Chugoku area (the western part of Honshu) is less than that in the other areas of Japan probably because of a “food related cultural inhibition”. In this study, we determined which characteristic of Natto (appearance...

  14. New energy technology development related database construction survey (wind power generation); Shin energy gijutsu kaihatsu kankei data shu sakusei chosa (furyoku hatsuden)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    To arrange systematic data relating to new energy, the latest published data relating to the wind energy conversion systems have been collected and arranged. For the overview of wind energy conversion system, wind turbines with horizontal axis and vertical axis, specification of wind turbine, and conceptual figure of wind energy conversion systems are illustrated. For the installation examples, introduction development of wind energy conversion systems in the world is described for Japan, the USA, Germany, Denmark, Spain, Sweden, India, and Belgium. For the relevant legislation and support plan, relevant legislation for the introduction of wind energy conversion in Japan, support plan in Japan, and support plans in foreign countries are described. Prices of wind turbines by wind turbine makers in the world, construction cost by Japanese makers, basic term, and subsidiary company and organization are shown

  15. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  16. Survey of Joint Implementation activities in China; Chugoku ni okeru kyodo jisshi katsudo kanren chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    It is a large task for Japan to positively promote the Joint Implementation activities related to the United Nations Framework Convention on Climate Change. Rapid increase in the emission of greenhouse-effect gases, especially CO2, is predicted in China with remarkable economic growth and population of 1.2 billion. It is essential to promote the Joint Implementation activities in China. In this survey, framework, organization, problems and tasks were investigated to effectively promote the Joint Implementation activities in China. Construction of framework for the real Joint Implementation activities has been proposed. Current problems for promoting the Joint Implementation activities in China are that the distinct guideline for the Joint Implementation is not established in the government, that the receiving system including receiving, planning and arranging sections is not established, and that the burden problems for the costs of project evaluation, data acquisition, monitoring, and verification are not solved. 5 refs., 21 figs., 6 tabs.

  17. Environment laws and regulations in China; Chugoku no kankyo hoki oyobi kankyo haishutsu kijun

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, K.

    1996-01-10

    The water environmental criteria in China consist of the sea water criteria, surface water criteria, fishery water criteria, agricultural water criteria, and scenery and recreational water criteria. This paper describes the problems thereof and the future assignments. The `sea water criteria` among other classifications of the water environmental criteria are under discussions for amendment that plan to increase the kinds of water from three in the conventional criteria to four kinds. Generation of harmful chemical substances has kept on decreasing since the 1980`s. However, as can be seen in part of the river water monitoring data, concentrations of pollutants show a trend of increase since 1994. This is caused by waste waters discharged from small-size chemical factories and hide tanning factories. Adequate regulations are applied to these `local enterprises`. Organic compound substances regulated under the waste water criteria are only seven kinds. As the kinds and amount of harmful chemical substances are anticipated to increase in the future, regulations that can deal with the new situation are required. Improvements are sought in the system of `discharge and contamination fee` imposed on industrial waste waters. Preparing the criteria for a total quantity regulation is an important assignment to be discussed as the forthcoming problem. 5 refs., 4 tabs.

  18. Distribution of photoperiod-insensitive alleles Ppd-B1a and Ppd-D1a and their effect on heading time in Japanese wheat cultivars.

    Science.gov (United States)

    Seki, Masako; Chono, Makiko; Matsunaka, Hitoshi; Fujita, Masaya; Oda, Shunsuke; Kubo, Katashi; Kiribuchi-Otobe, Chikako; Kojima, Hisayo; Nishida, Hidetaka; Kato, Kenji

    2011-12-01

    The genotypes of photoperiod response genes Ppd-B1 and Ppd-D1 in Japanese wheat cultivars were determined by a PCR-based method, and heading times were compared among genotypes. Most of the Japanese wheat cultivars, except those from the Hokkaido region, carried the photoperiod-insensitive allele Ppd-D1a, and heading was accelerated 10.3 days compared with the Ppd-D1b genotype. Early cultivars with Ppd-D1a may have been selected to avoid damage from preharvest rain. In the Hokkaido region, Ppd-D1a frequency was lower and heading date was late regardless of Ppd-D1 genotype, suggesting another genetic mechanism for late heading in Hokkaido cultivars. In this study, only 11 cultivars proved to carry Ppd-B1a, and all of them carried another photoperiod-insensitive allele, Ppd-D1a. The Ppd-B1a/Ppd-D1a genotype headed 6.7 days earlier than the Ppd-B1b/Ppd-D1a genotype, indicating a significant effect of Ppd-B1a in the genetic background with Ppd-D1a. Early-maturity breeding in Japan is believed to be accelerated by the introduction of the Ppd-B1a allele into medium-heading cultivars carrying Ppd-D1a. Pedigree analysis showed that Ppd-B1a in three extra-early commercial cultivars was inherited from 'Shiroboro 21' by early-heading Chugoku lines bred at the Chugoku Agriculture Experimental Station.

  19. Infection with Paragonimus westermani of boar-hunting dogs in Western Japan maintained via artificial feeding with wild boar meat by hunters.

    Science.gov (United States)

    Irie, Takao; Yamaguchi, Yohei; Doanh, Pham Ngoc; Guo, Zhi Hong; Habe, Shigehisa; Horii, Yoichiro; Nonaka, Nariaki

    2017-08-18

    Infection of boar-hunting dogs with Paragonimus westermani was investigated in Western Japan. Blood and rectal feces were collected from 441 dogs in the three districts (205 in Kinki, 131 in Chugoku and 105 in Shikoku District). In a screening ELISA for serum antibody against P. westermani antigen, 195 dogs (44.2%) showed positive reaction. In the 195 dogs, 8 dogs were found excreting P. westermani eggs after molecular analysis of fecal eggs, and additional 7 were identified serologically for the parasite infection because of their stronger reactivity against P. westermani antigen than against antigens of other species of Paragonimus. A spatial analysis showed that all of the P. westermani infections were found in Kinki and Chugoku Districts. In this area, dogs' experience of being fed with raw boar meat showed high odds ratio (3.35) to the sero-positivity in the screening ELISA, and the frequency of such experiences was significantly higher in sero-positive dogs. While clear relationship was not obtained between predation of boars by dogs during hunting and their sero-positivity. Therefore, it is suggested that human activity of feeding with wild boar meat is the risk factor for P. westermani infection in boar-hunting dogs. Considering that hunting dogs could play as a major definitive host and maintain the present distribution of P. westermani in Western Japan, control measures for the infection in hunting dogs, such as prohibition of raw meat feeding and regular deworming, should be undertaken.

  20. [A-bomb experience and Hibakushas' lives].

    Science.gov (United States)

    Akiba, Tadatoshi

    2012-01-01

    The A-bomb experience of Hiroshima may shed light on the reconstruction plan of the Eastern Japan Earthquake and Tsunami and on implementing middle to long range care plans for the victims of the catastrophe. An important element in the success of Hiroshima's reconstruction was the understanding of the realities of everyday life of citizens and hibakusha by local and national government, and incorporation of those points of view into the reconstruction plan. Sharing of accurate and fair information about the disaster, restoration, and reconstruction with citizens was and still is a prerequisite for success. To convey learned lessons from the Hiroshima experience, three books are helpful: "A-bomb Mayor" by Shinzo Hamai, "The Meaning of Survival" compiled by the Chugoku Shimbun and "The Children of the A-bomb" compiled by Arata Osada. They help understand the history of hibakusha psychology from the point of view of their everyday lives and may help those affected by the Earthquake and Tsunami. To summarize the history of psychological changes among the hibakusha, three key transitional pairs of statements used widely by them over the span of 66 years help show the change in their attitude and emotional outlook. Each pair consists of an expression from the period immediately following the bombing and a second more recent expression: (1) Transition from "I would rather die." to "I am glad I am alive." (2) Transition from "I would rather forget." to "We should not forget." (3) Transition from "You will understand if you are a victim." to "No one else should ever suffer as we did".

  1. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  2. Analysis of 5 year survival of esophageal cancer treated by radiotherapy

    International Nuclear Information System (INIS)

    Takegawa, Yoshihiro; Ohgushi, Ikuyo; Hiraki, Yoshio; Honke, Yoshifumi; Matsuki, Tsutomu; Yokoyama, Takashi; Yoshida, Mineo.

    1987-01-01

    Since 1984, a total of 1,419 patients with carcinoma of the esophagus were treated at the Department of Radiology of 17 hospitals in Chugoku-Shikoku province. The five year survival rate was 7.3 % (42/578 cases). Thirty-nine out of the forty-two cases were analyzed according to the tumor extent, localization and types of the X-ray findings. In addition, 95 patients (67 had been reported in other journals and 28 in this report) who have survived more than 5 years after radical radiotherapy were analyzed. (author)

  3. Fiscal 2000 survey report. Foundation building project for international energy use rationalization. Master plan preparation for rationalized energy use; 2000 nendo kokusai energy shiyo gorika kiso seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For energy conservation and environmental protection using technologies for effective consumption of energy and for preventing pollution due to energy consumption, master plans were studied and prepared on photovoltaic power generation, wind power generation, natural gas utilization, and so on, for the Xinjiang Uygur Zizhiqu, Gansu Province, and Guandong Province, respectively. Propositions addressing the Xinjiang Uygur Zizhiqu involved a decrease in dependence on coal, utilization of natural gas, introduction of coal-fired cogeneration systems, introduction of wind power up to the level equivalent to the supply reserve capability, energy conversion and new industry development using natural gas, promotion of electrification of local communities, and so on. Propositions addressing Gansu Province involved the hydroelectric power system as the core of power sources, decrease in dependence on coal, enhanced utilization of natural gas, energy conversion and new industry development utilizing natural gas, and so on. Propositions addressing Guangdong Province involved a decrease in dependence on coal and oil, enhanced utilization of natural gas, introduction of natural gas-fired combined cycle power generation into urban sectors, accelerated utilization of wind power generation on isolated islands, and so on. (NEDO)

  4. Fiscal 1997 report on the survey project on planning to execute `The New Earth 21`; 1997 nendo chosa hokokusho (`chikyu saisei keikaku` no jisshi keikaku sakusei ni kansuru chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Japan proposed in the Houston Summit the New Earth 21 to be carried out with technology development and technology transfer, and to make a concrete development of the project, Japan also proposed in the Tokyo Summit a TREE Plan for working out comprehensive strategies of the innovative technology development. In the CO3 Kyoto Conference in 1997, numerical targets for developed countries were determined which have legal binding force for control/reduction of greenhouse gas emissions in the term of 2008-2012. It was agreed to urge developing countries also to play a certain part in the project through the clean development. Therefore, the paper made quantitative analysis of important CO2 prevention technologies, technology transfer costs, and economical assessment by energy conservation. As a model, the DNE 21 model was upgraded and used into which CO2 prevention technologies, energy, economy and climate changes were integrated. In fiscal 1997, the following were carried out: collection of data on important CO2 prevention technologies and systems and analytical assessment using the DNE 21 model, CO2 reduction and selection of energy technology, assessment of energy system costs, construction of the unified DNE 21 model, and opening of the international workshop. 62 refs., 98 figs., 34 tabs.

  5. Development of creep damage assessment system for aged thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Nonaka, Isamu [IshikawaJima-Harima Heavy Industries Co., Ltd., Tokyo (Japan); Umaki, Hideo [Ishikawajima-Harima Heavy Industries Co., Ltd., Tokyo (Japan); Nishida, Hidetalca [The Chugoku Electric Power Co., Inc., Hiroshima (Japan); Yamaguchi, Hiroshi [The Chugoku Electric Power Co., Inc., Hiroshima (Japan)

    1999-12-31

    IHI has developed the Creep Damage Assessment System to identify voids by processing an image observed by a small laser microscope with an advanced image processing technique jointly with Chugoku Electric Power Co., Inc. The result can be obtained immediately on the spot. Application tests of the system at the Unit No.3 boiler of the Kudamatsu Power Station showed good operability, adaptability to the environment, and accuracy. The new system can easily indicate damage conditions in parts during the periodical inspection, allowing rapid maintenance. Time reduction required for assessment and increased reliability of equipment can be also achieved. (orig.)

  6. Development of creep damage assessment system for aged thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Nonaka, Isamu [IshikawaJima-Harima Heavy Industries Co., Ltd., Tokyo (Japan); Umaki, Hideo [Ishikawajima-Harima Heavy Industries Co., Ltd., Tokyo (Japan); Nishida, Hidetalca [The Chugoku Electric Power Co., Inc., Hiroshima (Japan); Yamaguchi, Hiroshi [The Chugoku Electric Power Co., Inc., Hiroshima (Japan)

    1998-12-31

    IHI has developed the Creep Damage Assessment System to identify voids by processing an image observed by a small laser microscope with an advanced image processing technique jointly with Chugoku Electric Power Co., Inc. The result can be obtained immediately on the spot. Application tests of the system at the Unit No.3 boiler of the Kudamatsu Power Station showed good operability, adaptability to the environment, and accuracy. The new system can easily indicate damage conditions in parts during the periodical inspection, allowing rapid maintenance. Time reduction required for assessment and increased reliability of equipment can be also achieved. (orig.)

  7. Planning documents: a business planning strategy.

    Science.gov (United States)

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  8. Conversion of helical tomotherapy plans to step-and-shoot IMRT plans--Pareto front evaluation of plans from a new treatment planning system.

    Science.gov (United States)

    Petersson, Kristoffer; Ceberg, Crister; Engström, Per; Benedek, Hunor; Nilsson, Per; Knöös, Tommy

    2011-06-01

    The resulting plans from a new type of treatment planning system called SharePlan have been studied. This software allows for the conversion of treatment plans generated in a TomoTherapy system for helical delivery, into plans deliverable on C-arm linear accelerators (linacs), which is of particular interest for clinics with a single TomoTherapy unit. The purpose of this work was to evaluate and compare the plans generated in the SharePlan system with the original TomoTherapy plans and with plans produced in our clinical treatment planning system for intensity-modulated radiation therapy (IMRT) on C-arm linacs. In addition, we have analyzed how the agreement between SharePlan and TomoTherapy plans depends on the number of beams and the total number of segments used in the optimization. Optimized plans were generated for three prostate and three head-and-neck (H&N) cases in the TomoTherapy system, and in our clinical treatment planning systems (TPS) used for IMRT planning with step-and-shoot delivery. The TomoTherapy plans were converted into step-and-shoot IMRT plans in SharePlan. For each case, a large number of Pareto optimal plans were created to compare plans generated in SharePlan with plans generated in the Tomotherapy system and in the clinical TPS. In addition, plans were generated in SharePlan for the three head-and-neck cases to evaluate how the plan quality varied with the number of beams used. Plans were also generated with different number of beams and segments for other patient cases. This allowed for an evaluation of how to minimize the number of required segments in the converted IMRT plans without compromising the agreement between them and the original TomoTherapy plans. The plans made in SharePlan were as good as or better than plans from our clinical system, but they were not as good as the original TomoTherapy plans. This was true for both the head-and-neck and the prostate cases, although the differences between the plans for the latter were

  9. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  10. A case study of IMRT planning (Plan B) subsequent to a previously treated IMRT plan (Plan A)

    International Nuclear Information System (INIS)

    2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Cao, F; 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Leong, C; 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Schroeder, J; 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Lee, B

    2014-01-01

    Background and purpose: Treatment of the contralateral neck after previous ipsilateral intensity modulated radiation therapy (IMRT) for head and neck cancer is a challenging problem. We have developed a technique that limits the cumulative dose to the spinal cord and brainstem while maximizing coverage of a planning target volume (PTV) in the contralateral neck. Our case involves a patient with right tonsil carcinoma who was given ipsilateral IMRT with 70Gy in 35 fractions (Plan A). A left neck recurrence was detected 14 months later. The patient underwent a neck dissection followed by postoperative left neck radiation to a dose of 66 Gy in 33 fractions (Plan B). Materials and Methods: The spinal cord-brainstem margin (SCBM) was defined as the spinal cord and brainstem with a 1.0 cm margin. Plan A was recalculated on the postoperative CT scan but the fluence outside of SCBM was deleted. A further modification of Plan A resulted in a base plan that was summed with Plan B to evaluate the cumulative dose received by the spinal cord and brainstem. Plan B alone was used to evaluate for coverage of the contralateral neck PTV. Results: The maximum cumulative doses to the spinal cord with 0.5cm margin and brainstem with 0.5cm margin were 51.96 Gy and 45.60 Gy respectively. For Plan B, 100% of the prescribed dose covered 95% of PTVb1. Conclusion: The use of a modified ipsilateral IMRT plan as a base plan is an effective way to limit the cumulative dose to the spinal cord and brainstem while enabling coverage of a PTV in the contralateral neck.

  11. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  12. Plan Repair as an Extension of Planning

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    In dynamic environments, agents have to deal with changing situations. In these cases, repairing a plan is often more efficient than planning from scratch, but existing planning techniques are more advanced than existing plan repair techniques. Therefore, we propose a straightforward method to

  13. Automatic planning of head and neck treatment plans

    DEFF Research Database (Denmark)

    Hazell, Irene; Bzdusek, Karl; Kumar, Prashant

    2016-01-01

    radiation dose planning (dosimetrist) and potentially improve the overall plan quality. This study evaluates the performance of the Auto-Planning module that has recently become clinically available in the Pinnacle3 radiation therapy treatment planning system. Twenty-six clinically delivered head and neck...... as the previously delivered clinical plans. For all patients, the Auto-Planning tool produced clinically acceptable head and neck treatment plans without any manual intervention, except for the initial target and OAR delineations. The main benefit of the method is the likely improvement in the overall treatment......Treatment planning is time-consuming and the outcome depends on the person performing the optimization. A system that automates treatment planning could potentially reduce the manual time required for optimization and could also pro-vide a method to reduce the variation between persons performing...

  14. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  15. Which characteristics of planning matter? Individual and dyadic physical activity plans and their effects on plan enactment.

    Science.gov (United States)

    Keller, Jan; Fleig, Lena; Hohl, Diana Hilda; Wiedemann, Amelie U; Burkert, Silke; Luszczynska, Aleksandra; Knoll, Nina

    2017-09-01

    Past research supports individual planning as an effective intervention strategy to increase physical activity in individuals. A similar strategy, dyadic planning, adds a planning partner who supports an individual's planning processes. Whether the two planning formats differ in terms of participants' entered plan content and whether and how different content characteristics are linked to plan enactment remains unknown. By investigating the content of generated plans, this study aimed at distinguishing plan characteristics of the two planning formats and examining their role as predictors of later plan enactment. Secondary analyses of a three-arm RCT with German couples (data collection between 2013 and 2015). Couples were assigned to an individual (IPC, n = 114) or dyadic planning condition (DPC, n = 111) and formulated up to 5 physical activity plans for a target person. Couples assigned to a control condition were not included as they did not generate plans. The following characteristics were distinguished and coded for each plan: number of planned opportunities, presence of a planned routine, planned cue- or activity-related specificity, activity-related intensity, and chronological plan rank. One week before (T0) and two weeks following (T2) the intervention (T1), increase vs. no increase of the planned activity was coded as a dichotomous plan enactment variable. Multilevel logistic regressions were fit. Plan enactment was higher in dyadic than in individual planners. Findings indicated that routines (e.g., after work) were positively related to plan enactment, whereas a high specificity of when-cues (e.g., Friday at 6.30 p.m.) showed a negative relationship. None of the examined plan characteristics could explain differences in enactment between IPC and DPC. Linking health behaviours to other behavioural routines seems beneficial for subsequent plan enactment. Dyadic planning was linked with higher enactment rates than individual planning. However, as

  16. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  17. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  18. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  19. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  20. Teaching planning theory as planner roles in urban planning education

    DEFF Research Database (Denmark)

    Olesen, Kristian

    2018-01-01

    Planning theory is often portrayed as a subject that urban planning students find too abstract and fail to see the relevance of. This paper advocates the perspective that planning theory can be made more student-friendly. This requires, firstly, that academic discussions about the relevance...... of planning theory for urban planning practice are integrated into the course module. If students are to appreciate planning theory, it requires that they understand how planning theory can inspire planning practice. Secondly, it requires careful considerations to the pedagogy of planning theory. The paper...... suggests that teaching planning theory as a variety of planner roles offers a helpful pedagogical approach for helping students construct their identities as urban planners. The paper builds on the author’s own experiences of teaching planning theory in a master’s urban planning programme, and has been...

  1. Self-interested Planning Agents using Plan Repair

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    We present a novel approach to multiagent planning for selfinterested agents. The main idea behind our approach is that multiagent planning systems should be built upon (singleagent) plan repair systems. In our system agents can exchange goals and subgoals through an auction, using their own

  2. Self-interested planning agents using plan repair

    NARCIS (Netherlands)

    R.P.J. van der Krogt; M.M. de Weerdt (Mathijs)

    2005-01-01

    htmlabstractWe present a novel approach to multiagent planning for selfinterested agents. The main idea behind our approach is that multiagent planning systems should be built upon (singleagent) plan repair systems. In our system agents can exchange goals and subgoals through an auction, using

  3. Practical planning extending the classical AI planning paradigm

    CERN Document Server

    Wilkins, David E

    2014-01-01

    Planning, or reasoning about actions, is a fundamental element of intelligent behavior--and one that artificial intelligence has found very difficult to implement. The most well-understood approach to building planning systems has been under refinement since the late 1960s and has now reached a level of maturity where there are good prospects for building working planners. Practical Planning is an in-depth examination of this classical planning paradigm through an intensive case study of SIPE, a significantly implemented planning system. The author, the developer of SIPE, defines the plann

  4. The survey of blood irradiation equipment. About the present condition and a problem

    International Nuclear Information System (INIS)

    Irikawa, Tomio; Kuramitsu, Hideaki; Tanaka, Keiko; Hamamoto, Takaaki

    2001-01-01

    Once it shows the symptoms of post transfusion graft versus host disease, mostly all examples follow fatal progress. For this reason, generally 15-50 Gy irradiation is performed into the blood for transfusion by the ''guideline of radiation'' of the Japan society of blood transfusion as measure only in development-of-symptoms prevention. This time, the questionnaire was performed for the hospital of 100 institutions of the Chugoku and the Shikoku district, and the actual condition of management employment of blood irradiation equipment was investigated. Consequently, there was little institution in which the medical-examination radiological technologist is participating directly, and it was made clear dependent on the maker of an equipment management. (author)

  5. Integrated operation and management system for a 700MW combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shiroumaru, I. (Yanai Power Plant Construction Office, Chugoku Electric Power Co., Inc., 1575-5 Yanai-Miyamoto-Shiohama, Yanai-shi, Yamaguchi-ken (JP)); Iwamiya, T. (Omika Works, Hitachi, Ltd., 5-2-1 Omika-cho, Hitachi-shi, Ibaraki-ken (JP)); Fukai, M. (Hitachi Works, Hitachi, Ltd., 3-1-1 Saiwai-cho, Hitachi-shi, Ibaraki-ken (JP))

    1992-03-01

    Yanai Power Plant of the Chugoku Electric Power Co., Inc. (Yamaguchi Pref., Japan) is in the process of constructing a 1400MW state-of-the-art combined cycle power plant. The first phase, a 350MW power plant, started operation on a commercial basis in November, 1990. This power plant has achieved high efficiency and high operability, major features of a combined cycle power plant. The integrated operation and management system of the power plant takes care of operation, maintenance, control of general business, etc., and was built using the latest computer and digital control and communication technologies. This paper reports that it is expected that this system will enhance efficient operation and management for the power plant.

  6. INFORMATION SYSTEM STRATEGIC PLANNING WITH ENTERPRISE ARCHITECTURE PLANNING

    Directory of Open Access Journals (Sweden)

    Lola Yorita Astri

    2013-05-01

    Full Text Available An integrated information system is needed in an enterprise to support businessprocesses run by an enterprise. Therefore, to develop information system can use enterprisearchitecture approach which can define strategic planning of enterprise information system. SMPNegeri 1 Jambi can be viewed as an enterprise because there are entities that should be managedthrough an integrated information system. Since there has been no unification of different elementsin a unity yet, enterprise architecture model using Enterprise Architecture Planning (EAP isneeded which will obtain strategic planning of enterprise information system in SMP Negeri 1Jambi. The goal of strategic planning of information system with Enterprise Architecture Planning(EAP is to define primary activities run by SMP Negeri 1 Jambi and support activities supportingprimary activities. They can be used as a basis for making data architecture which is the entities ofapplication architecture. At last, technology architecture is designed to describe technology neededto provide environment for data application. The plan of implementation is the activity plan madeto implemented architectures by enterprise.

  7. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  8. Intersection planning in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  9. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  10. OCRWM's evolving strategic planning process and the 1990 plan

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Munro, J.F.; Champagne, D.L.

    1991-01-01

    In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the strategic planning process being adopted by one of those organizations, the Office of Civilian Radioactive Waste Management (OCRWM). Secretary Watkins also ordered a much-abbreviated planning cycle for 1990 to produce the first set of plans in September. That first plan for OCRWM is also discussed here

  11. 76 FR 45606 - Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan...

    Science.gov (United States)

    2011-07-29

    ...-N131; 80221-1112-80221-F2] Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan Amendment, Southern California: Environmental Impact Statement AGENCY: Fish and..., as amended, for the proposed Desert Renewable Energy Conservation Plan (DRECP). The EIS will be a...

  12. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  13. Survey of implementation plan constructed for `the New Earth 21 Project`; Chikyu saisei keikaku no jisshi keikaku sakusei ni kansuru chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    It is necessary to establish scenarios for reducing CO2 emissions and for developing CO2 emission control technologies to obtain a global consensus, using appropriate analytical models. For modification of the DNE-21 (Dynamic New Earth 21) model, it has a category designated as innovative technologies not involving CO2 emission and an optional consideration for the absorption of atmospheric CO2 by biomass. A global carbon circulation model, including vegetation in its scope, is also incorporated. Major results of the simulation are shown. When 20% reduction in CO2 emissions is required for only OECD countries after the year 2020, it has been demonstrated that CO2 concentration in the atmosphere will reach as high as about 900 ppm in 2100 due to CO2 emission by developing countries, and will not be a tolerable level. Under the condition that CO2 concentration in the atmosphere is controlled at 450 ppm in 2100, the amount of renewable source of energy from photovoltaic power generation and biomass will increase and technologies of CO2 recovery and storage will decrease. Research and development of the production of methanol from recovered CO2 will be adopted as innovative technology for CO2 measures. 69 refs., 112 figs., 79 tabs.

  14. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  15. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  16. PlanJury: probabilistic plan evaluation revisited

    Science.gov (United States)

    Witte, M.; Sonke, J.-J.; van Herk, M.

    2014-03-01

    Purpose: Over a decade ago, the 'Van Herk margin recipe paper' introduced plan evaluation through DVH statistics based on population distributions of systematic and random errors. We extended this work for structures with correlated uncertainties (e.g. lymph nodes or parotid glands), and considered treatment plans containing multiple (overlapping) dose distributions (e.g. conventional lymph node and hypo-fractionated tumor doses) for which different image guidance protocols may lead to correlated errors. Methods: A command-line software tool 'PlanJury' was developed which reads 3D dose and structure data exported from a treatment planning system. Uncertainties are specified by standard deviations and correlation coefficients. Parameters control the DVH statistics to be computed: e.g. the probability of reaching a DVH constraint, or the dose absorbed at given confidence in a (combined) volume. Code was written in C++ and parallelized using OpenMP. Testing geometries were constructed using idealized spherical volumes and dose distributions. Results: Negligible stochastic noise could be attained within two minutes computation time for a single target. The confidence to properly cover both of two targets was 90% for two synchronously moving targets, but decreased by 7% if the targets moved independently. For two partially covered organs at risk the confidence of at least one organ below the mean dose threshold was 40% for synchronous motion, 36% for uncorrelated motion, but only 20% for either of the organs separately. Two abutting dose distributions ensuring 91% confidence of proper target dose for correlated motions led to 28% lower confidence for uncorrelated motions as relative displacements between the doses resulted in cold spots near the target. Conclusions: Probabilistic plan evaluation can efficiently be performed for complicated treatment planning situations, thus providing important plan quality information unavailable in conventional PTV based evaluations.

  17. A comparison of forward planning and optimised inverse planning

    International Nuclear Information System (INIS)

    Oldham, Mark; Neal, Anthony; Webb, Steve

    1995-01-01

    A radiotherapy treatment plan optimisation algorithm has been applied to 48 prostate plans and the results compared with those of an experienced human planner. Twelve patients were used in the study, and a 3, 4, 6 and 8 field plan (with standard coplanar beam angles for each plan type) were optimised by both the human planner and the optimisation algorithm. The human planner 'optimised' the plan by conventional forward planning techniques. The optimisation algorithm was based on fast-simulated-annealing. 'Importance factors' assigned to different regions of the patient provide a method for controlling the algorithm, and it was found that the same values gave good results for almost all plans. The plans were compared on the basis of dose statistics and normal-tissue-complication-probability (NTCP) and tumour-control-probability (TCP). The results show that the optimisation algorithm yielded results that were at least as good as the human planner for all plan types, and on the whole slightly better. A study of the beam-weights chosen by the optimisation algorithm and the planner will be presented. The optimisation algorithm showed greater variation, in response to individual patient geometry. For simple (e.g. 3 field) plans it was found to consistently achieve slightly higher TCP and lower NTCP values. For more complicated (e.g. 8 fields) plans the optimisation also achieved slightly better results with generally less numbers of beams. The optimisation time was always ≤5 minutes; a factor of up to 20 times faster than the human planner

  18. Don't Plan for the Unexpected: Planning Based on Plausibility Models

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2015-01-01

    is not computationally feasible. Weak epistemic planning is not satisfactory either, as there is no way to qualify which of two weak plans is more likely to lead to the goal. This seriously limits the practical uses of weak planning, as the planning agent might for instance always choose a plan that relies...... that the agent achieves this goal. Conversely, a weak plan promises only the possibility of leading to the goal. In real-life planning scenarios where the planning agent is faced with a high degree of uncertainty and an almost endless number of possible exogenous events, strong epistemic planning...

  19. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  20. Forward planning

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  1. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    International Nuclear Information System (INIS)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-01-01

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA

  2. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Alan, E-mail: alan.bond@uea.ac.uk [InteREAM (Interdisciplinary Research in Environmental Assessment and Management), School of Environmental Sciences, University of East Anglia, Norwich, NR4 7TJ (United Kingdom); Cave, Ben, E-mail: ben.cave@bcahealth.co.uk [Ben Cave Associates Ltd., Leeds (United Kingdom); Ballantyne, Rob, E-mail: robdballantyne@gmail.com [Planning and Health Consultant, Oxfordshire (United Kingdom)

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  3. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  4. Systemic Planning: Dealing with Complexity by a Wider Approach to Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    2005-01-01

    and methodology that can be helpful for planning under circumstances characterised by complexity and uncertainty. It is argued that compared to conventional, planning – referred to as systematic planning - there is a need for a wider, more systemic approach to planning that is better suited to current real......On the basis of a new book Systemic Planning this paper addresses systems thinking and complexity in a context of planning. Specifically, renewal of planning thinking on this background is set out as so-called systemic planning (SP). The principal concern of SP is to provide principles...

  5. What contributes to action plan enactment? Examining characteristics of physical activity plans.

    Science.gov (United States)

    Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U

    2017-11-01

    Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour

  6. Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

    Science.gov (United States)

    Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth

    2018-01-01

    The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544

  7. Comparison of CT based-CTV plan and CT based-ICRU38 plan in brachytherapy planning of uterine cervix cancer

    International Nuclear Information System (INIS)

    Shim, Jin Sup; Jo, Jung Kun; Si, Chang Keun; Lee, Ki Ho; Lee, Du Hyun; Choi, Kye Suk

    2004-01-01

    Although Improve of CT, MRI Radio-diagnosis and Radiation Therapy Planing, but we still use ICRU38 Planning system(2D film-based) broadly. 3-Dimensional ICR plan(CT image based) is not only offer tumor and normal tissue dose but also support DVH information. On this study, we plan irradiation-goal dose on CTV(CTV plan) and irradiation-goal dose on ICRU 38 point(ICRU38 plan) by use CT image. And compare with tumor-dose, rectal-dose, bladder-dose on both planning, and analysis DVH Sample 11 patients who treated by Ir-192 HDR. After 40 Gy external radiation therapy, ICR plan established. All the patients carry out CT-image scanned by CT-simulator. And we use PLATO(Nucletron) v.14.2 planing system. We draw CTV, rectum, bladder on the CT image. And establish plan irradiation- dose on CTV(CTV plan) and irradiation- dose on A-point(ICRU38 plan) CTV volume(average±SD) is 21.8±26.6 cm 3 , rectum volume(average±SD) is 60.9±25.0 cm 3 , bladder volume(average±SD) is 116.1±40.1cm 3 sampled 11 patients. The volume including 100% dose is 126.7±18.9 cm 3 on ICRU plan and 98.2±74.5 cm 3 on CTV plan. On ICRU planning, the other one's 22.0 cm 3 CTV volume who residual tumor size excess 4cm is not including 100% isodose. 8 patient's 12.9±5.9 cm 3 tumor volume who residual tumor size below 4 cm irradiated 100% dose. Bladder dose(recommended by ICRU 38) is 90.1±21.3 % on ICRU plan, 68.7±26.6% on CTV plan, and rectal dose is 86.4±18.3%, 76.9±15.6%. Bladder and Rectum maximum dose is 137.2±5.9%, 101.1±41.8% on ICRU plan, 107.6±47.9%, 86.9±30.8% on CTV plan. Therefore CTV plan more less normal issue-irradiated dose than ICRU plan. But one patient case who residual tumor size excess 4 cm, Normal tissue dose more higher than critical dose remarkably on CTV plan. 80% over-Irradiated rectal dose(V80rec) is 1.8±2.4 cm 3 on ICRU plan, 0.7±1.0 cm 3 on CTV plan. 80% over-Irradiated bladder dose(V80bla) is 12.2%±8.9 cm 3 on ICRU plan, 3.5±4.1 cm 3 on CTV plan. Likewise, CTV

  8. Land use planning in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  9. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    Science.gov (United States)

    Jongman, Suzanne R; Meyer, Antje S

    2017-11-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing the processing costs associated with concurrent listening and speaking. In two experiments, we assessed how identity and associative priming from spoken words onto picture naming were affected by a concurrent speech planning task. In a baseline (no name) condition, participants heard prime words that were identical, associatively related, or unrelated to target pictures presented two seconds after prime onset. Each prime was accompanied by a non-target picture and followed by its recorded name. The participant did not name the non-target picture. In the plan condition, the participants first named the non-target picture, instead of listening to the recording, and then the target. In Experiment 1, where the plan- and no-plan conditions were tested between participants, priming effects of equal strength were found in the plan and no-plan condition. In Experiment 2, where the two conditions were tested within participants, the identity priming effect was maintained, but the associative priming effect was only seen in the no-plan but not in the plan condition. In this experiment, participant had to decide at the onset of each trial whether or not to name the non-target picture, rendering the task more complex than in Experiment 1. These decision processes may have interfered with the processing of the primes. Thus, associative priming can take place during speech planning, but only if the cognitive load is not too high. Copyright © 2017 Elsevier B.V. All rights reserved.

  10. Teaching Treatment Planning.

    Science.gov (United States)

    Seligman, Linda

    1993-01-01

    Describes approach to teaching treatment planning that author has used successfully in both seminars and graduate courses. Clarifies nature and importance of systematic treatment planning, then describes context in which treatment planning seems more effectively taught, and concludes with step-by-step plan for teaching treatment planning.…

  11. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  12. Climate plan 2004; Plan climat 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  13. 76 FR 67105 - Cash Balance Plans; Benefit Determinations and Plan Valuations for Statutory Hybrid Plans...

    Science.gov (United States)

    2011-10-31

    ... annuity conversion rate. Under PBGC's operating policy on cash balance plans (established pre-PPA 2006... pension equity plan that provides for the use of deferred annuity conversion factors (or an interest rate... annuity conversion plan that uses a variable interest rate to determine the amount of a benefit, PBGC...

  14. DEFINED CONTRIBUTION PLANS, DEFINED BENEFIT PLANS, AND THE ACCUMULATION OF RETIREMENT WEALTH

    Science.gov (United States)

    Poterba, James; Rauh, Joshua; Venti, Steven; Wise, David

    2010-01-01

    The private pension structure in the United States, once dominated by defined benefit (DB) plans, is currently divided between defined contribution (DC) and DB plans. Wealth accumulation in DC plans depends on the participant's contribution behavior and on financial market returns, while accumulation in DB plans is sensitive to a participant's labor market experience and to plan parameters. This paper simulates the distribution of retirement wealth under representative DB and DC plans. It uses data from the Health and Retirement Study (HRS) to explore how asset returns, earnings histories, and retirement plan characteristics contribute to the variation in retirement wealth outcomes. We simulate DC plan accumulation by randomly assigning individuals a share of wages that they and their employer contribute to the plan. We consider several possible asset allocation strategies, with asset returns drawn from the historical return distribution. Our DB plan simulations draw earnings histories from the HRS, and randomly assign each individual a pension plan drawn from a sample of large private and public defined benefit plans. The simulations yield distributions of both DC and DB wealth at retirement. Average retirement wealth accruals under current DC plans exceed average accruals under private sector DB plans, although DC plans are also more likely to generate very low retirement wealth outcomes. The comparison of current DC plans with more generous public sector DB plans is less definitive, because public sector DB plans are more generous on average than their private sector counterparts. PMID:21057597

  15. Automated IMRT planning with regional optimization using planning scripts.

    Science.gov (United States)

    Xhaferllari, Ilma; Wong, Eugene; Bzdusek, Karl; Lock, Michael; Chen, Jeff

    2013-01-07

    Intensity-modulated radiation therapy (IMRT) has become a standard technique in radiation therapy for treating different types of cancers. Various class solutions have been developed for simple cases (e.g., localized prostate, whole breast) to generate IMRT plans efficiently. However, for more complex cases (e.g., head and neck, pelvic nodes), it can be time-consuming for a planner to generate optimized IMRT plans. To generate optimal plans in these more complex cases which generally have multiple target volumes and organs at risk, it is often required to have additional IMRT optimization structures such as dose limiting ring structures, adjust beam geometry, select inverse planning objectives and associated weights, and additional IMRT objectives to reduce cold and hot spots in the dose distribution. These parameters are generally manually adjusted with a repeated trial and error approach during the optimization process. To improve IMRT planning efficiency in these more complex cases, an iterative method that incorporates some of these adjustment processes automatically in a planning script is designed, implemented, and validated. In particular, regional optimization has been implemented in an iterative way to reduce various hot or cold spots during the optimization process that begins with defining and automatic segmentation of hot and cold spots, introducing new objectives and their relative weights into inverse planning, and turn this into an iterative process with termination criteria. The method has been applied to three clinical sites: prostate with pelvic nodes, head and neck, and anal canal cancers, and has shown to reduce IMRT planning time significantly for clinical applications with improved plan quality. The IMRT planning scripts have been used for more than 500 clinical cases.

  16. Planning for seven generations: Energy planning of American Indian tribes

    International Nuclear Information System (INIS)

    Brookshire, Daniel; Kaza, Nikhil

    2013-01-01

    The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development

  17. Planning principles as integral tool of financial planning implementation at enterprise

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2016-09-01

    Full Text Available The main problems of using financial planning tools, namely its principles, in order to achieve an effective system of financial planning at the enterprise are considered. Planning is an integral part of management and provides achievement of sustainable enterprise development, that is why, effective financial planning is the necessary means of realization of the main objective of the company – profit maximization. It is determined that the principles of financial planning are the objective category of planning science, which serves as a starting fundamental concept that expresses the cumulative effect of a number of laws. In addition, on the base of the aggregation and analysis of planning principles the system of financial planning principles is specified, providing efficient financial planning and control functions use, achievement of the mission and objectives of the economic entity activity management and ensuring of its profitability. The scientific novelty of the research lies in the specification of financial planning principles defining at the enterprise and their semantic characteristics

  18. LANDSCAPE PLANNING IN UKRAINE: THE FIRST LANDSCAPE-PLANNING PROGRAM

    Directory of Open Access Journals (Sweden)

    Leonid Rudenko

    2013-01-01

    Full Text Available The paper presents the results of the first, in Ukraine; project on landscape planning widely accepted in European countries. Under the project implemented in 2010–2013, a landscape-planning program has been developed for the Cherkassy oblast. This is the first document of this kind in Ukraine. The program is mainly based on the experience of the German and Russian schools of landscape planning and on research and assessment conducted by the authors, which allowed identifying approaches to landscape planning, principles of the national policy, and characteristics and potential of environmentally friendly planning in Ukraine. The paper discusses the main phases of the work on the development of the landscape program for the oblast. It also identifies the main stages and key concepts and principles of landscape planning. The paper presents the results of integrated research on the identification and classification of conflicts in land use and the integral concept of the developmental goals for the oblast. The results can be the foundation for adopting management decisions and development of action plans for the lower hierarchal branches.

  19. Operation planning device

    International Nuclear Information System (INIS)

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  20. 14 CFR 152.105 - Sponsors and planning agencies: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Sponsors and planning agencies: Airport planning. 152.105 Section 152.105 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF....105 Sponsors and planning agencies: Airport planning. (a) To be eligible to apply for a project for...

  1. Planning hierarchy, modeling and sdvanced planning dystems

    OpenAIRE

    Meyr, Herbert Ottmar

    2003-01-01

    Planning hierarchy, modeling and sdvanced planning dystems / B. Fleischmann, H. Meyr. - In: Supply chain management / ed. by A. G. de Kok ... - Amsterdam u.a. : Elsevier, 2003. - (Handbooks in operations research and management science ; 11)

  2. Assessment of PlanIQ Feasibility DVH for head and neck treatment planning.

    Science.gov (United States)

    Fried, David V; Chera, Bhishamjit S; Das, Shiva K

    2017-09-01

    Designing a radiation plan that optimally delivers both target coverage and normal tissue sparing is challenging. There are limited tools to determine what is dosimetrically achievable and frequently the experience of the planner/physician is relied upon to make these determinations. PlanIQ software provides a tool that uses target and organ at risk (OAR) geometry to indicate the difficulty of achieving different points for organ dose-volume histograms (DVH). We hypothesized that PlanIQ Feasibility DVH may aid planners in reducing dose to OARs. Clinically delivered head and neck treatments (clinical plan) were re-planned (re-plan) putting high emphasis on maximally sparing the contralateral parotid gland, contralateral submandibular gland, and larynx while maintaining routine clinical dosimetric objectives. The planner was blinded to the results of the clinically delivered plan as well as the Feasibility DVHs from PlanIQ. The re-plan treatments were designed using 3-arc VMAT in Raystation (RaySearch Laboratories, Sweden). The planner was then given the results from the PlanIQ Feasibility DVH analysis and developed an additional plan incorporating this information using 4-arc VMAT (IQ plan). The DVHs across the three treatment plans were compared with what was deemed "impossible" by PlanIQ's Feasibility DVH (Impossible DVH). The impossible DVH (red) is defined as the DVH generated using the minimal dose that any voxel outside the targets must receive given 100% target coverage. The re-plans performed blinded to PlanIQ Feasibilty DVH achieved superior sparing of aforementioned OARs compared to the clinically delivered plans and resulted in discrepancies from the impossible DVHs by an average of 200-700 cGy. Using the PlanIQ Feasibility DVH led to additionalOAR sparing compared to both the re-plans and clinical plans and reduced the discrepancies from the impossible DVHs to an average of approximately 100 cGy. The dose reduction from clinical to re-plan and re-plan to

  3. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    International Nuclear Information System (INIS)

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error–based IMRT planning approach.

  4. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    Energy Technology Data Exchange (ETDEWEB)

    Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  5. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    International Nuclear Information System (INIS)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-01-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  6. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    International Nuclear Information System (INIS)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-01-01

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  7. Plan's CCCD approach - Country study PLAN-Bangladesh

    NARCIS (Netherlands)

    Uffelen, van G.J.

    2009-01-01

    PLAN Netherlands National Organisation has in coordination with PLAN International Headquarters commissioned an independent formative evaluation study to get systematic insight in the preconditions for appropriate functionality of Child Centred Community Development (CCCD) and to strengthen common

  8. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  9. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  10. Inverse planning and class solutions for brachytherapy treatment planning

    International Nuclear Information System (INIS)

    Trnkova, P.

    2010-01-01

    Brachytherapy or interventional radiooncology is a method of radiation therapy. It is a method, where a small encapsulated radioactive source is placed near to / in the tumour and therefore delivers high doses directly to the target volume. Organs at risk (OARs) are spared due to the inverse square dose fall-off. In the past years there was a slight stagnation in the development of techniques for brachytherapy treatment. While external beam radiotherapy became more and more sophisticated, in brachytherapy traditional methods have been still used. Recently, 3D imaging was considered also as the modality for brachytherapy and more precise brachytherapy could expand. Nowadays, an image guided brachytherapy is state-of-art in many centres. Integration of imaging methods lead to the dose distribution individually tailored for each patient. Treatment plan optimization is mostly performed manually as an adaptation of a standard loading pattern. Recently, inverse planning approaches have been introduced into brachytherapy. The aim of this doctoral thesis was to analyze inverse planning and to develop concepts how to integrate inverse planning into cervical cancer brachytherapy. First part of the thesis analyzes the Hybrid Inverse treatment Planning and Optimization (HIPO) algorithm and proposes a workflow how to safely work with this algorithm. The problem of inverse planning generally is that only the dose and volume parameters are taken into account and spatial dose distribution is neglected. This fact can lead to unwanted high dose regions in a normal tissue. A unique implementation of HIPO into the treatment planning system using additional features enabled to create treatment plans similar to the plans resulting from manual optimization and to shape the high dose regions inside the CTV. In the second part the HIPO algorithm is compared to the Inverse Planning Simulated Annealing (IPSA) algorithm. IPSA is implemented into the commercial treatment planning system. It

  11. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  12. Comparison of CT based-CTV plan and CT based-ICRU38 plan in brachytherapy planning of uterine cervix cancer

    International Nuclear Information System (INIS)

    Cho, Jung Keun; Han, Tae Jong

    2007-01-01

    Purpose : In spite of recent remarkable improvement of diagnostic imaging modalities such as CT, MRI, and PET and radiation therapy planing systems, ICR plan of uterine cervix cancer, based on recommendation of ICRU38(2D film-based) such as point A, is still used widely. A 3-dimensional ICR plan based on CT image provides Dose-Volume Histogram(DVH) information of the tumor and normal tissue. In this study, we compared tumor-dose, rectal-dose and bladder-dose through an analysis of DVH between CTV plan and ICRU38 plan based on CT image. Method and Material : We analyzed 11 patients with a cervix cancer who received the ICR of Ir-192 HDR. After 40Gy of external beam radiation therapy, ICR plan was established using PLATO(Nucletron) v.14.2 planning system. CT scan was done to all the patients using CT-simulator(Ultra Z, Philips). We contoured CTV, rectum and bladder on the CT image and established CTV plan which delivers the 100% dose to CTV and ICRU plan which delivers the 100% dose to the point A. Result : The volume(average±SD) of CTV, rectum and bladder in all of 11 patients is 21.8±6.6cm 3 , 60.9±25.0cm 3 , 111.6±40.1cm 3 respectively. The volume covered by 100% isodose curve is 126.7±18.9cm 3 in ICRU plan and 98.2±74.5cm 3 in CTV plan(p=0.0001), respectively. In (On) ICRU planning 22.0cm 3 of CTV volume was not covered by 100% isodose curve in one patient whose residual tumor size is greater than 4cm, while more than 100% dose was irradiated unnecessarily to the normal organ of 62.2±4.8cm 3 other than the tumor in the remaining 10 patients with a residual tumor less than 4cm in size. Bladder dose recommended by ICRU 38 was 90.1±21.3% and 68.7±26.6% in ICRU plan and in CTV plan respectively(p=0.001) while rectal dose recommended by ICRU 38 was 86.4±18.3% and 76.9±15.6% in ICRU plan and in CTV plan, respectively(p=0.08). Bladder and rectum maximum dose was 137.2±50.1%, 101.1±41.8% in ICRU plan and 107.6±47.9%, 86.9±30.8% in CTV plan, respectively

  13. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  14. Role of regional planning organizations in transportation planning across boundaries

    Science.gov (United States)

    2014-06-11

    The Volpe Center conducted research for the Federal Highway Administration Office of Planning that explores the implications of Regional Planning Organizations (RPO) engaging in transportation planning partnerships and projects of megaregions signifi...

  15. Smart City Planning

    DEFF Research Database (Denmark)

    Ekman, Ulrik

    2018-01-01

    This article reflects on the challenges for urban planning posed by the emergence of smart cities in network societies. In particular, it reflects on reductionist tendencies in existing smart city planning. Here the concern is with the implications of prior reductions of complexity which have been...... undertaken by placing primacy in planning on information technology, economical profit, and top-down political government. Rather than pointing urban planning towards a different ordering of these reductions, this article argues in favor of approaches to smart city planning via complexity theory....... Specifically, this article argues in favor of approaching smart city plans holistically as topologies of organized complexity. Here, smart city planning is seen as a theory and practice engaging with a complex adaptive urban system which continuously operates on its potential. The actualizations in the face...

  16. Changed planning for planned and unplanned change

    NARCIS (Netherlands)

    Woerkum, van C.; Aarts, N.; Herzele, Van A.

    2011-01-01

    Change, planned and unplanned, can be the product of events (change by chance), new language (change from societal interaction), and practices (track-bound change), and can involve many different societal actors. To position planning as an activity within this broader context, we present a model

  17. Planned hospital birth versus planned home birth

    DEFF Research Database (Denmark)

    Olsen, O.; Clausen, J.A.

    2012-01-01

    Observational studies of increasingly better quality and in different settings suggest that planned home birth in many places can be as safe as planned hospital birth and with less intervention and fewer complications. This is an update of a Cochrane review first published in 1998....

  18. Planning for strategic change? A participative planning approach for community hospitals.

    Science.gov (United States)

    MacDonald, S K; Beange, J E; Blachford, P C

    1992-01-01

    Strategic planning is becoming to hospitals what business case analysis is to private corporations. In fact, this type of planning is becoming essential for the professional management of Ontario hospitals. The participative strategic planning process at Toronto East General Hospital (TEGH) is an example of how a professionally structured and implemented strategic planning process can be successfully developed and implemented in a community hospital. In this article, the environmental factors driving planning are reviewed and the critical success factors for the development and implementation of a strategic plan are examined in the context of TEGH's experience.

  19. Radiation therapy treatment planning: CT, MR imaging and three-dimensional planning

    International Nuclear Information System (INIS)

    Lichter, A.S.

    1987-01-01

    The accuracy and sophistication of radiation therapy treatment planning have increased rapidly in the last decade. Currently, CT-based treatment planning is standard throughout the country. Care must be taken when CT is used for treatment planning because of clear differences between diagnostic scans and scans intended for therapeutic management. The use of CT in radiation therapy planning is discussed and illustrated. MR imaging adds another dimension to treatment planning. The ability to use MR imaging directly in treatment planning involves an additional complex set of capabilities from a treatment planning system. The ability to unwarp the geometrically distorted MR image is a first step. Three-dimensional dose calculations are important to display the dose on sagittal and acoronal sections. The ability to integrate the MR and CT images into a unified radiographic image is critical. CT and MR images are two-dimensional representations of a three-dimensional problem. Through sophisticated computer graphics techniques, radiation therapists are now able to integrate a three-dimensional image of the patient into the treatment planning process. This allows the use of noncoplanar treatment plans and a detailed analysis of tumor and normal tissue anatomy; it is the first step toward a fully conformational treatment planning system. These concepts are illustrated and future research goals outlined

  20. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  1. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  2. Survey of technological advancement of coal exploitation in Asia and Pacific for fiscal 1997. Formulation of production plans for model coal mines in China; 1997 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Chugoku ni okeru model tanko no seisan keikaku no sakutei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In view of the prospective demand for coal in China and of the current state of transportation, a development plan is formulated for Tangkou Mining Area (of model mines) for the purpose of realizing efficient exploitation of coal. The infrastructures for coal transportation are complete in this area, and delivery of coal is easy from this area to the coal demanding regions. Although coal seams are quite deep in the ground, the important ones contain rich reserves. Exploitation is carried out under a vertical shaft scheme, in which pits extend horizontally at the level of 950m below the sea surface. As for production, an annual yield of 3-million ton is predicted thanks to two compositely mechanized coal faces. Coal is won by the monolayer side hole method in the case of seams not thicker than 4.0m, and by the caved stope method in the case not thinner than 4.0m. Employed for the mines are 1077 people. Operation days are 300, efficiency 15t/man/shift. The annual sale in total is expected to be worth 759-million 534.6-thousand yuan. To be required for the construction will be 1.2-billion yuan for mines and 0.2-billion yuan for coal dressing facilities, or 1.4-billion yuan in all, and the figures indicate that the plan is economically promising. 43 figs., 119 tabs.

  3. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  4. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  5. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  6. Inverse planning for interstitial gynecologic template brachytherapy: truly anatomy-based planning

    International Nuclear Information System (INIS)

    Lessard, Etienne; Hsu, I-Chou; Pouliot, Jean

    2002-01-01

    Purpose: Commercially available optimization schemes generally result in an undesirable dose distribution, because of the particular shapes of tumors extending laterally from the tandem. Dose distribution is therefore manually obtained by adjusting relative dwell time values until an acceptable solution is found. The objective of this work is to present the clinical application of an inverse planning dose optimization tool for the automatic determination of source dwell time values in the treatment of interstitial gynecologic templates. Methods and Materials: In cases where the tumor extends beyond the range of the tandem-ovoid applicator, catheters as well as the tandem are inserted into the paravaginal and parametrial region in an attempt to cover the tumor volume. CT scans of these patients are then used for CT-based dose planning. Dose distribution is obtained manually by varying the relative dwell times until adequate dose coverage is achieved. This manual planning is performed by an experienced physician. In parallel, our in-house inverse planning based on simulated annealing is used to automatically determine which of all possible dwell positions will become active and to calculate the dwell time values needed to fulfill dose constraints applied to the tumor volume and to each organ at risk. To compare the results of these planning methods, dose-volume histograms and isodose distributions were generated for the target and each organ at risk. Results: This procedure has been applied for the dose planning of 12 consecutive interstitial gynecologic templates cases. For all cases, once the anatomy was contoured, the routine of inverse planning based on simulated annealing found the solution to the dose constraints within 1 min of CPU time. In comparison, manual planning took more than 45 min. The inverse planning-generated plans showed improved protection to organs at risk for the same coverage compared to manual planning. Conclusion: This inverse planning tool

  7. The text plan concept: contributions to the writing planning process

    Directory of Open Access Journals (Sweden)

    Ana Lúcia Tinoco Cabral

    2013-12-01

    Full Text Available Students - at different levels, ranging from early grades up to PhD - face problems both on comprehension and text production. This paper focuses on the text plan concept according to the DTA (Discourse Text Analysis approach, i.e., a principle of organization that allows students to put into practice the production intention as well as to arrange text information while producing; being responsible for the text compositional structure (Adam, 2008. The study analyzes the relation between text plan and the writing planning process, in which the first one provides the second with theoretical support. In order to develop such research, the study covers some issues related to the reading skill, analyzes an argumentative text as per its textual plan, and presents some reflections on the writing process, focusing on the relation between textual plan and the writing planning process.

  8. The Modern Management of Urban Planning and the Controlling Planning

    Institute of Scientific and Technical Information of China (English)

    1991-01-01

    <正> Since 1980s,with the further reform of political and economic systems,the urban construc-tion in our country has undergone great changes,greater than ever.Such changes pose a series ofnew problems to urban planning:How should planning be suitable for the development of moderncities?How should planning management coordinate with urban planning?How to carry out ur-ban planning under new situations? etc.The answers to these problems lie in one point:urbanplanning and plann ing management must be restructured.Only when the former is well com-bined with the latter can the above problems be solved satisfactorily.This article provides someviews in this respect.

  9. 26 CFR 1.401(a)(4)-5 - Plan amendments and plan terminations.

    Science.gov (United States)

    2010-04-01

    ... employer decides to wind up its business. In the process of ceasing operations, but at a time when the plan.... (4) Operational restrictions on certain money purchase pension plans. A money purchase pension plan... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Plan amendments and plan terminations. 1.401(a...

  10. Multiemployer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active multiemployer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  11. Is pregnancy planning associated with background characteristics and pregnancy-planning behavior?

    DEFF Research Database (Denmark)

    Stern, Jenny; Salih Joelsson, Lana; Tydén, Tanja

    2016-01-01

    household income, to be currently working (≥50%) and to have longer relationships than women with unplanned pregnancies. The level of pregnancy planning was associated with planning behavior, such as information-seeking and intake of folic acid, but without a reduction in alcohol consumption. One......-third of all women took folic acid 1 month prior to conception, 17% used tobacco daily and 11% used alcohol weekly 3 months before conception. Conclusions A majority rated their pregnancy as very or fairly planned, with socio-economic factors as explanatory variables. The level of pregnancy planning should......Introduction Prevalence of planned pregnancies varies between countries but is often measured in a dichotomous manner. The aim of this study was to investigate to what level pregnant women had planned their pregnancies and whether pregnancy planning was associated with background characteristics...

  12. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  13. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  14. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  15. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-13

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. A companion report focuses on non-plan-related factors that affect transmission projects.

  16. Calfornia General Plans

    Data.gov (United States)

    California Natural Resource Agency — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  17. Public affairs plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  18. Public affairs plan

    International Nuclear Information System (INIS)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies

  19. Beijing international welding fair report. Kokusaika ni ugokidashita chugoku yosetsukai

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This paper reports the affairs at the Beijing International Scientific Conference for Welding and the International Welding Fair held in May 1991, including visitors{prime} comments on their impression. The Scientific Conference was held for three days in eleven sessions, where 135 theses were presented, most of which were related to high-tech areas including robotization, automation, laser welding and cutting, and ceramic bonding. The total attendance numbered 231 members, including 30 from Germany, 20 from Japan, 17 from Soviet, 7 from Korea, and one each from Finland and Switzerland, plus 150 from China. It was the third meeting for the Scientific Conference, which had the number of attendance jumped from the previous one showing the increased interest by the international welding industry toward China. Exhibits from overseas countries were few, a possible effect from the Tiananmen incident, only three from Japan. Welding machines exhibited by China were those made in or licensed by Japan. Strong impression was felt on the spread in use of CO{sub 2} semi-automatic welding machines. 3 figs.

  20. Feature-based plan adaptation for fast treatment planning in scanned ion beam therapy

    International Nuclear Information System (INIS)

    Chen Wenjing; Gemmel, Alexander; Rietzel, Eike

    2013-01-01

    We propose a plan adaptation method for fast treatment plan generation in scanned ion beam therapy. Analysis of optimized treatment plans with carbon ions indicates that the particle number modulation of consecutive rasterspots in depth shows little variation throughout target volumes with convex shape. Thus, we extract a depth-modulation curve (DMC) from existing reference plans and adapt it for creation of new plans in similar treatment situations. The proposed method is tested with seven CT serials of prostate patients and three digital phantom datasets generated with the MATLAB code. Plans are generated with a treatment planning software developed by GSI using single-field uniform dose optimization for all the CT datasets to serve as reference plans and ‘gold standard’. The adapted plans are generated based on the DMC derived from the reference plans of the same patient (intra-patient), different patient (inter-patient) and phantoms (phantom-patient). They are compared with the reference plans and a re-positioning strategy. Generally, in 1 min on a standard PC, either a physical plan or a biological plan can be generated with the adaptive method provided that the new target contour is available. In all the cases, the V95 values of the adapted plans can achieve 97% for either physical or biological plans. V107 is always 0 indicating no overdosage, and target dose homogeneity is above 0.98 in all cases. The dose received by the organs at risk is comparable to the optimized plans. The plan adaptation method has the potential for on-line adaptation to deal with inter-fractional motion, as well as fast off-line treatment planning, with either the prescribed physical dose or the RBE-weighted dose. (paper)

  1. Logistics planning and logistics planning factors for humanitarian operations

    OpenAIRE

    Sullivan, Donna Marie.

    1995-01-01

    Due to the increasing demand on the military to conduct humanitarian operations, the need for logistics planning factors that are applicable to these operations has arisen. This thesis develops a model for humanitarian operations and employs the model to develop logistics planning factors for material consumption and a computer-assisted planning aid relating to the support of the victim population. U.S. Navy (U.S.N.) author.

  2. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  3. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  4. Agent independent task planning

    Science.gov (United States)

    Davis, William S.

    1990-01-01

    Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

  5. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  6. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  7. Drug plan design incentives among Medicare prescription drug plans.

    Science.gov (United States)

    Huskamp, Haiden A; Keating, Nancy L; Dalton, Jesse B; Chernew, Michael E; Newhouse, Joseph P

    2014-07-01

    Medicare Advantage prescription drug plans (MA-PDs) and standalone prescription drug plans (PDPs) face different incentives for plan design resulting from the scope of covered benefits (only outpatient drugs for PDPs versus all drug and nondrug services for Medicare Advantage [MA]/MA-PDs). The objective is to begin to explore how MA-PDs and PDPs may be responding to their different incentives related to benefit design. We compared 2012 PDP and MA-PD average formulary coverage, prior authorization (PA) or step therapy use, and copayment requirements for drugs in 6 classes used commonly among Medicare beneficiaries. We primarily used 2012 Prescription Drug Plan Formulary and Pharmacy Network Files and MA enrollment data. 2011 Truven Health MarketScan claims were used to estimate drug prices and to compute drug market share. Average coverage and PA/step rates, and average copayment requirements, were weighted by plan enrollment and drug market share. MA-PDs are generally more likely to cover and less likely to require PA/step for brand name drugs with generic alternatives than PDPs, and MA-PDs often have lower copayment requirements for these drugs. For brands without generics, we generally found no differences in average rates of coverage or PA/step, but MA-PDs were more likely to cover all brands without generics in a class. We found modest, confirmatory evidence suggesting that PDPs and MA-PDs respond to different incentives for plan design. Future research is needed to understand the factors that influence Medicare drug plan design decisions.

  8. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  9. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  10. The Trade-Off between Planning Objectives and Planning Success

    Directory of Open Access Journals (Sweden)

    Laval Valerian

    2016-12-01

    Full Text Available The aim of this paper it to analyse, why companies face difficulties in implementing modern planning concepts. For this the paper will discuss and define the terminology and goals of modern planning. Based on this, the article analyses how strategy orientation influences the willingness of companies to move from traditional budgeting to modern budgeting concepts. It will be outlined, why especially companies pursuing a cost leadership strategy are still reluctant to open themselves for modern budgeting concepts. The contribution of this paper is to analyse the influence of the strategy orientation on the readiness of organizations. Also it will be illustrated, how the overall value added of the corporate planning can be improved by prioritizing the most appropriate planning objectives.

  11. Strategic Planning and the Long-term R&D Plan

    International Nuclear Information System (INIS)

    Cooley, J.

    2015-01-01

    The Department of Safeguards of the International Atomic Energy Agency implements a structured strategic planning process to ensure that safeguards will continue to be both effective and efficient in the future. This process provides the Department with a comprehensive and coherent planning framework for the short (2 years), medium (6 years) and long (12 years) term. The Department's suite of planning documents includes a long-term strategic plan and an associated long-term research and development plan as well as a biennial development and implementation support programme. The Department's Long-Term Strategic Plan 2012-2023 addresses the conceptual framework for safeguards implementation, legal authority, technical capabilities (expertise, equipment and infrastructure) and the human and financial resources necessary for Agency verification activities. As research and development (R&D) are essential to meet the safeguards needs of the future, the Department-s Long-Term R&D Plan 2012-2023 is designed to support the Long-Term Strategic Plan 2012-2023 by setting out the capabilities that the Department needs to achieve its strategic objectives, and key milestones towards achieving those capabilities for which Member State R&D support is needed. The Long-Term R&D Plan 2012-2023 addresses the Department's R&D requirements in areas such as safeguards concepts and approaches; detection of undeclared nuclear material and activities; safeguards equipment and communication; information technology, collection, analysis and security; analytical services; new mandates; and training. Long-term capabilities discussed in the presentation include deployed systems (e.g., equipment at facilities); analytical (e.g., sample analysis), operational (e.g., staff expertise and skills) and readiness (e.g., safeguarding new types of facilities) capabilities. To address near-term development objectives and support the implementation of its verification activities as well as to

  12. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  13. Business plan competition

    CERN Multimedia

    2007-01-01

    "Venture – Companies for tomorrow" is a business plan competition, which supports students and other junior entrepreneurs in developing their business plans. The sixth edition of the competition is now taking place. Venture 2008 highlights: - prize money totalling CHF 150’000; - possibility to optimize business ideas and business plans with the help of experienced coaches: around 200 coaches are available, with a wide range of backgrounds, entrepreneurs as well as venture capitalists; -\tpossibility to present business ideas and business plans to potential investors ("Investor Days" - 17 January and 7 May); - active involvement in the start-up community; -\tcontribution to potential independence. The competition consists of two phases: Phase I, Business idea, Deadline for submission of business idea: 5 December 2007 (online at http://www.venture.ch). Award Ceremony: 17 January 2008 Phase II, Business plan Deadline for submission of business plan: 2 April 2008 (online at...

  14. Planning oral narrative tasks: optimizing strategic planning condition through strategy instruction

    Directory of Open Access Journals (Sweden)

    André Luís Specht

    2017-06-01

    Full Text Available This article presents the results of a master thesis, which aimed at investigating the impact of strategic planning instruction on the speech performance of 6 L2 Brazilian learners. The participants, Letras-Inglês students, performed three now-and-there picture-cued narrative tasks under three different conditions: (1 no planning, (2 planning before instruction, and (3 planning after instruction. In addition, the participants filled in post-task questionnaires after the performance of each task, aiming at understanding their opinion on the conditions and tasks. Quantitative and qualitative analyses were conducted in order to examine participants’ oral production and perception, respectively. In general, there was no statistical evidence supporting the impact of instruction on participants’ oral planned performance; however, some statistical results approached significance, which may suggest some positive effects. Qualitative analyses provided positive evidence of the impact of strategic planning instruction on participant perception and their use of strategies during planning time. Moreover, the results of this study can contribute to the fields of Second Language Acquisition and Language Pegadogy.

  15. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on "what is actually...... done", as opposed to Habermas`  focus on "what should be done". We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  16. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    2002-01-01

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on ?what is actually...... done?, as opposed to Habermas?s focus on ?what should be done?. We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  17. Planning for agroforestry

    NARCIS (Netherlands)

    Budd, W.W.; Duchhart, I.; Hardesty, L.N.; Steiner, F.

    1990-01-01

    In this book a selection of contributions to the international symposium "Planning for agroforestry", held at Washington State University on April 24-27, 1989, is published. First the planning for agroforestry and agroforestry diagnosis and design is viewed over. Then the planning for and

  18. Automation of radiation treatment planning. Evaluation of head and neck cancer patient plans created by the Pinnacle"3 scripting and Auto-Planning functions

    International Nuclear Information System (INIS)

    Speer, Stefan; Weiss, Alexander; Bert, Christoph; Klein, Andreas; Kober, Lukas; Yohannes, Indra

    2017-01-01

    Intensity-modulated radiotherapy (IMRT) techniques are now standard practice. IMRT or volumetric-modulated arc therapy (VMAT) allow treatment of the tumor while simultaneously sparing organs at risk. Nevertheless, treatment plan quality still depends on the physicist's individual skills, experiences, and personal preferences. It would therefore be advantageous to automate the planning process. This possibility is offered by the Pinnacle"3 treatment planning system (Philips Healthcare, Hamburg, Germany) via its scripting language or Auto-Planning (AP) module. AP module results were compared to in-house scripts and manually optimized treatment plans for standard head and neck cancer plans. Multiple treatment parameters were scored to judge plan quality (100 points = optimum plan). Patients were initially planned manually by different physicists and re-planned using scripts or AP. Script-based head and neck plans achieved a mean of 67.0 points and were, on average, superior to manually created (59.1 points) and AP plans (62.3 points). Moreover, they are characterized by reproducibility and lower standard deviation of treatment parameters. Even less experienced staff are able to create at least a good starting point for further optimization in a short time. However, for particular plans, experienced planners perform even better than scripts or AP. Experienced-user input is needed when setting up scripts or AP templates for the first time. Moreover, some minor drawbacks exist, such as the increase of monitor units (+35.5% for scripted plans). On average, automatically created plans are superior to manually created treatment plans. For particular plans, experienced physicists were able to perform better than scripts or AP; thus, the benefit is greatest when time is short or staff inexperienced. (orig.) [de

  19. Automation of radiation treatment planning : Evaluation of head and neck cancer patient plans created by the Pinnacle3 scripting and Auto-Planning functions.

    Science.gov (United States)

    Speer, Stefan; Klein, Andreas; Kober, Lukas; Weiss, Alexander; Yohannes, Indra; Bert, Christoph

    2017-08-01

    Intensity-modulated radiotherapy (IMRT) techniques are now standard practice. IMRT or volumetric-modulated arc therapy (VMAT) allow treatment of the tumor while simultaneously sparing organs at risk. Nevertheless, treatment plan quality still depends on the physicist's individual skills, experiences, and personal preferences. It would therefore be advantageous to automate the planning process. This possibility is offered by the Pinnacle 3 treatment planning system (Philips Healthcare, Hamburg, Germany) via its scripting language or Auto-Planning (AP) module. AP module results were compared to in-house scripts and manually optimized treatment plans for standard head and neck cancer plans. Multiple treatment parameters were scored to judge plan quality (100 points = optimum plan). Patients were initially planned manually by different physicists and re-planned using scripts or AP. Script-based head and neck plans achieved a mean of 67.0 points and were, on average, superior to manually created (59.1 points) and AP plans (62.3 points). Moreover, they are characterized by reproducibility and lower standard deviation of treatment parameters. Even less experienced staff are able to create at least a good starting point for further optimization in a short time. However, for particular plans, experienced planners perform even better than scripts or AP. Experienced-user input is needed when setting up scripts or AP templates for the first time. Moreover, some minor drawbacks exist, such as the increase of monitor units (+35.5% for scripted plans). On average, automatically created plans are superior to manually created treatment plans. For particular plans, experienced physicists were able to perform better than scripts or AP; thus, the benefit is greatest when time is short or staff inexperienced.

  20. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  1. The nuclear emergency plans

    International Nuclear Information System (INIS)

    Fuertes Menendez, M. J.; Gasco Leonarte, L.; Granada Ferrero, M. J.

    2007-01-01

    Planning of the response to emergencies in nuclear plants is regulated by the Basic Nuclear Emergency Plan (PLABEN). This basic Plan is the guidelines for drawing up, implementing and maintaining the effectiveness of the nuclear power plant exterior nuclear emergency plans. The five exterior emergency plans approved as per PLABEN (PENGUA, PENCA, PENBU, PENTA and PENVA) place special emphasis on the preventive issues of emergency planning, such as implementation of advance information programs to the population, as well as on training exercises and drills. (Author)

  2. When does treatment plan optimization require inverse planning?

    International Nuclear Information System (INIS)

    Sherouse, George W.

    1995-01-01

    Increasing maturity of image-based computer-aided design of three-dimensional conformal radiotherapy has recently sparked a great deal of work in the area of treatment plan optimization. Optimization of a conformal photon beam treatment plan is that exercise through which a set of intensity-modulated static beams or arcs is specified such that, when the plan is executed, 1) a region of homogeneous dose is produced in the patient with a shape which geometrically conforms (within a specified tolerance) to the three-dimensional shape of a designated target volume and 2) acceptably low incidental dose is delivered to non-target tissues. Interest in conformal radiotherapy arise from a fundamental assumption that there is significant value to be gained from aggressive customization of the treatment for each individual patient In our efforts to design optimal treatments, however, it is important to remember that, given the biological and economic realities of clinical radiotherapy, mathematical optimization of dose distribution metrics with respect to some minimal constraint set is not a necessary or even sufficient condition for design of a clinically optimal treatment. There is wide variation in the complexity of the clinical situations encountered in practice and there are a number of non-physical criteria to be considered in planning. There is also a complementary variety of computational and engineering means for achieving optimization. To date, the scientific dialogue regarding these techniques has concentrated on development of solutions to worst-case scenarios, largely in the absence of consideration of appropriate matching of solution complexity to problem complexity. It is the aim of this presentation to propose a provisional stratification of treatment planning problems, stratified by relative complexity, and to identify a corresponding stratification of necessary treatment planning techniques. It is asserted that the subset of clinical radiotherapy cases for

  3. Personal strategic planning

    Directory of Open Access Journals (Sweden)

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  4. Interactive Energy Planning

    DEFF Research Database (Denmark)

    Blarke, Morten Boje

    2006-01-01

    Though it is being questioned whether planning theory should be fitted into neat typologies, some have described evolving planning theory as a journey away from ethnocentrism, through the lands of rationalism, pragmatism, socio-ecological idealism, political-economic mobilization, currently...... anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...

  5. Marketing plan

    OpenAIRE

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  6. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  7. Setup planning for machining

    CERN Document Server

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  8. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  9. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  10. Views on planning and expectations of SEA: the case of transport planning

    International Nuclear Information System (INIS)

    Hilden, Mikael; Furman, Eeva; Kaljonen, Minna

    2004-01-01

    This paper examines the effectiveness of strategic environmental assessment (SEA) in transport planning in the light of different views of planning: synoptic optimising planning, communicative planning and planning as a social struggle. The analysis uses empirical materials from 17 case studies collected by survey from Member Countries of the United Nation's Economic Commission for Europe (UN/ECE) and further processed in a practitioners' workshop, and also a detailed case study carried out in Finland. The case studies and the workshop identified a set of necessary conditions and facilitating factors that contribute to the effectiveness of strategic environmental assessments in transport planning. Our findings suggest that transport planning can often best be characterised as a social struggle over problem definitions and future choices. Thus, the effectiveness of SEA will depend on how well the assessment fits into the planning context and on its actual contribution to debates on problem definitions. Specific procedural steps may improve the effectiveness but explicit requirements to recognise SEA in decision making are likely to be a key condition

  11. An Analysis of Plan Robustness for Esophageal Tumors: Comparing Volumetric Modulated Arc Therapy Plans and Spot Scanning Proton Planning

    International Nuclear Information System (INIS)

    Warren, Samantha; Partridge, Mike; Bolsi, Alessandra; Lomax, Anthony J.; Hurt, Chris; Crosby, Thomas; Hawkins, Maria A.

    2016-01-01

    Purpose: Planning studies to compare x-ray and proton techniques and to select the most suitable technique for each patient have been hampered by the nonequivalence of several aspects of treatment planning and delivery. A fair comparison should compare similarly advanced delivery techniques from current clinical practice and also assess the robustness of each technique. The present study therefore compared volumetric modulated arc therapy (VMAT) and single-field optimization (SFO) spot scanning proton therapy plans created using a simultaneous integrated boost (SIB) for dose escalation in midesophageal cancer and analyzed the effect of setup and range uncertainties on these plans. Methods and Materials: For 21 patients, SIB plans with a physical dose prescription of 2 Gy or 2.5 Gy/fraction in 25 fractions to planning target volume (PTV)_5_0_G_y or PTV_6_2_._5_G_y (primary tumor with 0.5 cm margins) were created and evaluated for robustness to random setup errors and proton range errors. Dose–volume metrics were compared for the optimal and uncertainty plans, with P<.05 (Wilcoxon) considered significant. Results: SFO reduced the mean lung dose by 51.4% (range 35.1%-76.1%) and the mean heart dose by 40.9% (range 15.0%-57.4%) compared with VMAT. Proton plan robustness to a 3.5% range error was acceptable. For all patients, the clinical target volume D_9_8 was 95.0% to 100.4% of the prescribed dose and gross tumor volume (GTV) D_9_8 was 98.8% to 101%. Setup error robustness was patient anatomy dependent, and the potential minimum dose per fraction was always lower with SFO than with VMAT. The clinical target volume D_9_8 was lower by 0.6% to 7.8% of the prescribed dose, and the GTV D_9_8 was lower by 0.3% to 2.2% of the prescribed GTV dose. Conclusions: The SFO plans achieved significant sparing of normal tissue compared with the VMAT plans for midesophageal cancer. The target dose coverage in the SIB proton plans was less robust to random setup errors and might be

  12. An Analysis of Plan Robustness for Esophageal Tumors: Comparing Volumetric Modulated Arc Therapy Plans and Spot Scanning Proton Planning

    Energy Technology Data Exchange (ETDEWEB)

    Warren, Samantha, E-mail: samantha.warren@oncology.ox.ac.uk [Cancer Research UK/Medical Research Council Oxford Institute for Radiation Oncology, Gray Laboratories, University of Oxford, Oxford (United Kingdom); Partridge, Mike [Cancer Research UK/Medical Research Council Oxford Institute for Radiation Oncology, Gray Laboratories, University of Oxford, Oxford (United Kingdom); Bolsi, Alessandra; Lomax, Anthony J. [Centre for Proton Therapy, Paul Scherrer Institute, Villigen (Switzerland); Hurt, Chris [Wales Cancer Trials Unit, School of Medicine, Heath Park, Cardiff (United Kingdom); Crosby, Thomas [Velindre Cancer Centre, Velindre Hospital, Cardiff (United Kingdom); Hawkins, Maria A. [Cancer Research UK/Medical Research Council Oxford Institute for Radiation Oncology, Gray Laboratories, University of Oxford, Oxford (United Kingdom)

    2016-05-01

    Purpose: Planning studies to compare x-ray and proton techniques and to select the most suitable technique for each patient have been hampered by the nonequivalence of several aspects of treatment planning and delivery. A fair comparison should compare similarly advanced delivery techniques from current clinical practice and also assess the robustness of each technique. The present study therefore compared volumetric modulated arc therapy (VMAT) and single-field optimization (SFO) spot scanning proton therapy plans created using a simultaneous integrated boost (SIB) for dose escalation in midesophageal cancer and analyzed the effect of setup and range uncertainties on these plans. Methods and Materials: For 21 patients, SIB plans with a physical dose prescription of 2 Gy or 2.5 Gy/fraction in 25 fractions to planning target volume (PTV){sub 50Gy} or PTV{sub 62.5Gy} (primary tumor with 0.5 cm margins) were created and evaluated for robustness to random setup errors and proton range errors. Dose–volume metrics were compared for the optimal and uncertainty plans, with P<.05 (Wilcoxon) considered significant. Results: SFO reduced the mean lung dose by 51.4% (range 35.1%-76.1%) and the mean heart dose by 40.9% (range 15.0%-57.4%) compared with VMAT. Proton plan robustness to a 3.5% range error was acceptable. For all patients, the clinical target volume D{sub 98} was 95.0% to 100.4% of the prescribed dose and gross tumor volume (GTV) D{sub 98} was 98.8% to 101%. Setup error robustness was patient anatomy dependent, and the potential minimum dose per fraction was always lower with SFO than with VMAT. The clinical target volume D{sub 98} was lower by 0.6% to 7.8% of the prescribed dose, and the GTV D{sub 98} was lower by 0.3% to 2.2% of the prescribed GTV dose. Conclusions: The SFO plans achieved significant sparing of normal tissue compared with the VMAT plans for midesophageal cancer. The target dose coverage in the SIB proton plans was less robust to random setup

  13. Knowledge-based radiation therapy (KBRT) treatment planning versus planning by experts: validation of a KBRT algorithm for prostate cancer treatment planning

    International Nuclear Information System (INIS)

    Nwankwo, Obioma; Mekdash, Hana; Sihono, Dwi Seno Kuncoro; Wenz, Frederik; Glatting, Gerhard

    2015-01-01

    A knowledge-based radiation therapy (KBRT) treatment planning algorithm was recently developed. The purpose of this work is to investigate how plans that are generated with the objective KBRT approach compare to those that rely on the judgment of the experienced planner. Thirty volumetric modulated arc therapy plans were randomly selected from a database of prostate plans that were generated by experienced planners (expert plans). The anatomical data (CT scan and delineation of organs) of these patients and the KBRT algorithm were given to a novice with no prior treatment planning experience. The inexperienced planner used the knowledge-based algorithm to predict the dose that the OARs receive based on their proximity to the treated volume. The population-based OAR constraints were changed to the predicted doses. A KBRT plan was subsequently generated. The KBRT and expert plans were compared for the achieved target coverage and OAR sparing. The target coverages were compared using the Uniformity Index (UI), while 5 dose-volume points (D 10 , D 30, D 50 , D 70 and D 90 ) were used to compare the OARs (bladder and rectum) doses. Wilcoxon matched-pairs signed rank test was used to check for significant differences (p < 0.05) between both datasets. The KBRT and expert plans achieved mean UI values of 1.10 ± 0.03 and 1.10 ± 0.04, respectively. The Wilcoxon test showed no statistically significant difference between both results. The D 90 , D 70, D 50 , D 30 and D 10 values of the two planning strategies, and the Wilcoxon test results suggests that the KBRT plans achieved a statistically significant lower bladder dose (at D 30 ), while the expert plans achieved a statistically significant lower rectal dose (at D 10 and D 30 ). The results of this study show that the KBRT treatment planning approach is a promising method to objectively incorporate patient anatomical variations in radiotherapy treatment planning

  14. Planning ahead

    Energy Technology Data Exchange (ETDEWEB)

    Davies, J. [Mintec Inc. (US)

    2004-09-01

    The paper presents a state-of-the-art mine planning program that facilitates data storage and provides easy access to essential mine information. MineSight from Mintec, Inc., and the addition MineSight 3D provide a powerful tool used by major coal companies worldwide, offering modelling of different deposit types and complete planning tools including advanced surface/surface and solid/surface intersection routines. The new MineSight Operations addition helps to streamline the planning process and store raw blasthole data (in acQuire) and essential cut attribute information. 12 figs.

  15. Data-Driven Planning: Using Assessment in Strategic Planning

    Science.gov (United States)

    Bresciani, Marilee J.

    2010-01-01

    Data-driven planning or evidence-based decision making represents nothing new in its concept. For years, business leaders have claimed they have implemented planning informed by data that have been strategically and systematically gathered. Within higher education and student affairs, there may be less evidence of the actual practice of…

  16. Urban sustainability through strategic planning: A case of metropolitan planning in Khulna city, Bangladesh

    Directory of Open Access Journals (Sweden)

    Md. Ashiq Ur Rahman

    2016-06-01

    Full Text Available Planning is a crucial element for any development initiative. Planning entails choice making in pursuit of stated goals e.g. improving living conditions for individuals and societies. Planning initiatives are employed within social systems that are governed by institution, and planning intervenes with and may reconfigure these institutions resulting in social change. This paper discusses how urban sustainability can be achieved through strategic action in urban development by analysing the planning process of Khulna city, Bangladesh. This paper reviews different scholarly articles to draw a conceptual framework for identifying the interface of strategic planning, components of strategic action planning and urban sustainability. Based on this conceptual framework this paper identifies the scope of achieving urban sustainability through analysing the current planning practice of Khulna city, Bangladesh. This paper identifies that though the Khulna city plan adopted the approach of strategic planning but it failed to comply with its theoretical notion to achieve the issues related to urban sustainability. Analysis reveals that in terms of social attribute that recognizes the interest of different group of people the exiting planning packages is not sustainable. Similar phenomenon have been observed in terms of recognition of gender and marginalized people in planning, equitable provision of income and employment generation, peoples’ participation in planning and polices for ensuring equitable access to infrastructure services. Therefore the existing planning package of Khulna city failed to achieve the issues of urban sustainability through its adapted strategic planning approach.

  17. Marketing Planning: Feeniks Koulu

    OpenAIRE

    Raut, Biranjan

    2013-01-01

    Degree Thesis “Marketing Planning: Feeniks Koulu” demonstrates structured marketing planning process with the help of case company “Feeniks Koulu”. The central idea of Thesis is to come up with systematic marketing plan following structured process. Thesis employs qualitative research methodology following inductive reasoning approach. Thesis, initiates by outlining theoretical planning methods, which then is materialized into marketing plan with the help of empirical research. Discussion and...

  18. The Importance of a Business Plan when Planning a ...

    African Journals Online (AJOL)

    The Importance of a Business Plan when Planning a Lexicographical Project* ... It is, however, an important step towards the establishment of a dictionary project. The compilation of a dictionary ... AJOL African Journals Online. HOW TO USE ...

  19. SU-E-T-173: Clinical Comparison of Treatment Plans and Fallback Plans for Machine Downtime

    Energy Technology Data Exchange (ETDEWEB)

    Cruz, W [University of Texas Health Science Center at San Antonio, San Antonio, TX (United States); Cancer Therapy and Research Center, San Antonio, TX (United States); Papanikolaou, P [University of Texas Health Science Center at San Antonio, San Antonio, TX (United States); Mavroidis, P [University of North Carolina, Chapel Hill, NC (United States); Stathakis, S [Cancer Therapy and Research Center, San Antonio, TX (United States)

    2015-06-15

    Purpose: The purpose of this study was to determine the clinical effectiveness and dosimetric quality of fallback planning in relation to machine downtime. Methods: Plans for a Varian Novalis TX were mimicked, and fallback plans using an Elekta VersaHD machine were generated using a dual arc template. Plans for thirty (n=30) patients of various treatment sites optimized and calculated using RayStation treatment planning system. For each plan, a fall back plan was created and compared to the original plan. A dosimetric evaluation was conducted using the homogeneity index, conformity index, as well as DVH analysis to determine the quality of the fallback plan on a different treatment machine. Fallback plans were optimized for 60 iterations using the imported dose constraints from the original plan DVH to give fallback plans enough opportunity to achieve the dose objectives. Results: The average conformity index and homogeneity index for the NovalisTX plans were 0.76 and 10.3, respectively, while fallback plan values were 0.73 and 11.4. (Homogeneity =1 and conformity=0 for ideal plan) The values to various organs at risk were lower in the fallback plans as compared to the imported plans across most organs at risk. Isodose difference comparisons between plans were also compared and the average dose difference across all plans was 0.12%. Conclusion: The clinical impact of fallback planning is an important aspect to effective treatment of patients. With the complexity of LINACS increasing every year, an option to continue treating during machine downtime remains an essential tool in streamlined treatment execution. Fallback planning allows the clinic to continue to run efficiently should a treatment machine become offline due to maintenance or repair without degrading the quality of the plan all while reducing strain on members of the radiation oncology team.

  20. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  1. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    Science.gov (United States)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

  2. Reasoning about plans

    CERN Document Server

    Allen, James; Pelavin, Richard; Tenenberg, Josh

    1991-01-01

    This book presents four contributions to planning research within an integrated framework. James Allen offers a survey of his research in the field of temporal reasoning, and then describes a planning system formalized and implemented directly as an inference process in the temporal logic. Starting from the same logic, Henry Kautz develops the first formal specification of the plan recognition process and develops a powerful family of algorithms for plan recognition in complex situations. Richard Pelavin then extends the temporal logic with model operators that allow the representation to

  3. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Science.gov (United States)

    2010-05-11

    ...] Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic... draft Environmental Planning and Historic Preservation Compliance Costs policy and a draft Environmental Planning and Historic Preservation Mitigation policy. DATES: Comments must be received by June 10, 2010...

  4. 7 CFR 1210.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plan. 1210.303 Section 1210.303 Agriculture... PLAN Watermelon Research and Promotion Plan Definitions § 1210.303 Plan. Plan means this watermelon research and promotion Plan issued by the Secretary pursuant to the Act. ...

  5. Health Workforce Planning

    Science.gov (United States)

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  6. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  7. Human-scientific Planning Theory

    OpenAIRE

    Hagen, Aksel

    1998-01-01

    This working report is a paper written to XII AESOP Congress 22 – 25 July 1998, Aveiro, Portugal. It is a presentation of human-scientific action theory and its linkage to planning, both planning theory and planning practice. Human-scientific action theory is created by professor Gunnar Olsson and professor José Luis Ramírez, Nordic School of Planning, Stockholm. Planning is primarily a practical and reflective activity. The notion ”Planning” may, therefore, describe the activi...

  8. Village family planning volunteers in Indonesia: their role in the family planning programme.

    Science.gov (United States)

    Utomo, Iwu Dwisetyani; Arsyad, Syahmida S; Hasmi, Eddy Nurul

    2006-05-01

    Family planning was once a sensitive issue in Indonesia, but today it is considered essential. This paper reports on a study in 1997-98 of the role of village family planning volunteers and the cadres who worked under them in West Java, Central Java and DI Yogyakarta, in implementing the national family planning programme in Indonesia. A total of 108 village family planning volunteers, 108 family planning cadres, 108 local leaders and 324 couples eligible for family planning from 36 villages in the three provinces were interviewed. The volunteers and cadres have made a significant contribution to the implementation of the family planning programme. They promote family planning, organise meetings, provide information, organise income-generation activities, give savings and credit assistance, collect and report data and deliver other family welfare services. Teachers, wives of government officials and others recognised by the community as better off in terms of education and living conditions were most often identified to become family planning volunteers. Because they are women and because they are the most distant arm of the programme, their work is taken for granted. As their activities are directed towards women, especially in women's traditional roles, the programme tends to entrench the existing gender gap in responsibility for family planning and family welfare.

  9. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  10. TrainerPlan : Tu plan de entrenamientos en tu móvil

    OpenAIRE

    López de Aberasturi Ortiz de Pinedo, Aitor

    2017-01-01

    TrainerPlan es una aplicación móvil desarrollada para terminales Android que permitirá la generación y consulta de planes de entrenamiento que podrán ser compartidos por diferentes usuarios. TrainerPlan és una aplicació mòbil desenvolupada per a terminals Android que permetrà la generació i consulta de plans d'entrenament que podran ser compartits per diferents usuaris. TrainerPlan is a mobile application developed for Android terminals that will allow the generation and consultation of...

  11. Factor 4 planning

    International Nuclear Information System (INIS)

    Bariol-Mathais, Brigitte; Lavoillotte, Philippine; Gall-Sorrentino, Florence; Malez, Marianne; Sanna, Daniela; Marsauche, Maud; Marquet, Sarah; Debergue, Sophie; Aminu, Olufunmi; Bernard, Helene; Marchand, Jean-Michel; Blin, Frederic; Grange, Jerome; Caillierez, Sophie; Muller, Dania; Clement, Bob; Desire, Jean-Charles; Metais, Benedicte; Lannuzel, Philippe; Pezet-Kuhn, Murielle; Pons, Anne; Rivoire-Meley, Benedicte; Tissot, Heloise

    2015-07-01

    Factor 4 is the goal of cutting our greenhouse gas emissions by 75% by 2050. Achieving this objective will necessitate radical changes in our practices, in particular concerning transport and housing; the measures currently implemented, such as positive-energy buildings, low-impact mobility and eco-neighbourhoods, will not be enough to meet this goal. These measures must be conceived in the framework of broad territorial planning that integrates environmental and energy objectives far upstream. To this end, the French Environment and Energy Management Agency (ADEME) and the French network of Urban Planning Agencies (FNAU), pursuing their missions in their respective areas of competence, have joined forces to make infrastructure and land use planning an integral part of the environmental and energy transition process. In 2013, the two organisations signed a partnership agreement and compiled an inventory of practices that are relevant to Factor 4 planning. This work was led by Epures, Saint-etienne urban planning agency, along with FNAU, drawing upon the expertise of a dozen urban planning agencies in precursor territories. This inventory describes the stakes, resources and strengths for each territory, which have led to cross-sectoral territorial planning exercises with ambitious environmental and energy objectives; the importance of evaluation in attaining these goals is emphasised. Current experience, questions and available methodological tools are summarised in this document, to encourage territories and help them design their planning policies along a trajectory to achieve Factor 4 goals. The compilation also aims to be a contribution to the COP21 climate conference

  12. Account-based retiree medical plans: what's good for your pension plan may be good for your retiree medical plan.

    Science.gov (United States)

    Ruschau, W J

    2001-09-01

    Many of the same forces that caused employers to gravitate toward account-based pension plans are beginning to spark similar changes in retiree medical plans. As medical costs continue to escalate, account-based retiree medical plans offer a new way to manage company outlays, while preserving an important benefit for retirees.

  13. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  14. 1990-1991 Marketing Plan. Year II: Planning To Meet the Future.

    Science.gov (United States)

    Turcott, Frances; And Others

    In Maryland, Catonsville Community College's (CCC) 1990-91 marketing plan deals with the community's perceptions of the institution and strategies to improve CCC's image. Both the 1989-90 and 1990-91 plans targeted the same markets for special recruitment strategies; i.e., high school graduates with transfer plans, part-time adult students,…

  15. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  16. On strategic spatial planning

    Directory of Open Access Journals (Sweden)

    Tošić Branka

    2014-01-01

    Full Text Available The goal of this paper is to explain the origin and development of strategic spatial planning, to show complex features and highlight the differences and/or advantages over traditional, physical spatial planning. Strategic spatial planning is seen as one of approaches in legally defined planning documents, and throughout the display of properties of sectoral national strategies, as well as issues of strategic planning at the local level in Serbia. The strategic approach is clearly recognized at the national and sub-national level of spatial planning in European countries and in our country. It has been confirmed by the goals outlined in documents of the European Union and Serbia that promote the grounds of territorial cohesion and strategic integrated planning, emphasizing cooperation and the principles of sustainable spatial development. [Projekat Ministarstva nauke Republike Srbije, br. 176017

  17. Communication Planning.

    Science.gov (United States)

    Development Communication Report, 1978

    1978-01-01

    Communication planning in developing countries is discussed in individual articles on theory, knowledge production and utilization, planning at the regional level, software, and rural development. A nutrition education project and three experiments in developing educational materials with feedback from villagers in Africa are described in the…

  18. Knowledge-based treatment planning and its potential role in the transition between treatment planning systems.

    Science.gov (United States)

    Masi, Kathryn; Archer, Paul; Jackson, William; Sun, Yilun; Schipper, Matthew; Hamstra, Daniel; Matuszak, Martha

    2017-11-22

    Commissioning a new treatment planning system (TPS) involves many time-consuming tasks. We investigated the role that knowledge-based planning (KBP) can play in aiding a clinic's transition to a new TPS. Sixty clinically treated prostate/prostate bed intensity-modulated radiation therapy (IMRT) plans were exported from an in-house TPS and were used to create a KBP model in a newly implemented commercial application. To determine the benefit that KBP may have in a TPS transition, the model was tested on 2 groups of patients. Group 1 consisted of the first 10 prostate/prostate bed patients treated in the commercial TPS after the transition from the in-house TPS. Group 2 consisted of 10 patients planned in the commercial TPS after 8 months of clinical use. The KBP-generated plan was compared with the clinically used plan in terms of plan quality (ability to meet planning objectives and overall dose metrics) and planning efficiency (time required to generate clinically acceptable plans). The KBP-generated plans provided a significantly improved target coverage (p = 0.01) compared with the clinically used plans for Group 1, but yielded plans of comparable target coverage to the clinically used plans for Group 2. For the organs at risk, the KBP-generated plans produced lower doses, on average, for every normal-tissue objective except for the maximum dose to 0.1 cc of rectum. The time needed for the KBP-generated plans ranged from 6 to 15 minutes compared to 30 to 150 and 15 to 60 minutes for manual planning in Groups 1 and 2, respectively. KBP is a promising tool to aid in the transition to a new TPS. Our study indicates that high-quality treatment plans could have been generated in the newly implemented TPS more efficiently compared with not using KBP. Even after 8 months of the clinical use, KBP still showed an increase in plan quality and planning efficiency compared with manual planning. Copyright © 2017 American Association of Medical Dosimetrists. Published

  19. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  20. Family planning education.

    Science.gov (United States)

    Hamburg, M V

    1983-02-01

    17 days were spent devoted to the effort of learning about China's educational approach to family planning in the hope of discovering how they are achieving their remarkable success in reducing population growth. As a member of the 1981 New York University/SIECUS Colloquim in China, it was necessary to rely on the translation provided by the excellent guides. Discussions were focused on questions prepared in advance about the topics that concerned the group. These observations, based on a short and limited exposure, cover the following areas: marriage and family planning policies; the family planning program; school programs; adult education; family planning workers; and unique aspects of the program. China has an official position on marriage and family planning that continues to undergo revisions. The new marriage law sets the minimum ages of marriage at 22 for men and 20 for women. Almost everyone marries, and an unmarried person over age 28 is a rarity. The family planning program in China is carried out by an extensive organizational network at national, provincial, and local government levels. Officials termed it a "propaganda campaign." Hospitals, clinics, and factories invariably displayed posters; a popular set of four presents the advantages of the 1 child family as follows: late marriage is best, for it allows more time to work and study; 1 child is best for the health of the mother; one gets free medical care for his/her child if a family has only 1 child; and there is more time to teach 1 child. The state operated television regularly explains the 1 child policy utilizing special films. According to 1 family planning official, "before marriage there is little sex." There are few abortions for unmarried women. Education about sex is for adults, for those persons who are about to be married. There is little if any sex education in schools. Sexual teaching is not generally acceptable, especially in the rural areas. By contrast, in Shanghai the physiology

  1. Practical Planning in COLLAGE

    Science.gov (United States)

    Lansky, Amy L.; Getoor, Lise C.; Friedland, Peter (Technical Monitor)

    1994-01-01

    COLLAGE is a domain-independent planner that differs from traditional planners in two key ways: (1) it uses a diverse and extendible set of (it action-based) plan constructions methods; and (2) it utilizes a technique called (it localization) to partition the planning problem into smaller (and potentially interacting) sub problems. In this paper, we describe these features and how they are exploited in two different real-world planning domains. The first domain, building construction planning, has served as a framework for us to investigate how localization can improve scalability. The second domain, data analysis planning, benefits from COLLAGE's unique plan construction and representation methods. In addition, we describe extensions that were necessary to tackle these real-world problems.

  2. Planning Practice and Research

    DEFF Research Database (Denmark)

    2013-01-01

    Urban planning has dramatically shifted when compared with its former logics and styles. Increasingly, the dynamics of large urban agglomerations spanning multiple boundaries put significant pressure on planning institutions to scale up. In this shifting context, how can both planning theory...... and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...... papers from Young Academics. The contributions should address the question of how planning theory and practice can respond to the increasing complexity of cities and regions....

  3. Tax Planning for Enterprises

    Institute of Scientific and Technical Information of China (English)

    Fan Weiqing

    2011-01-01

    @@ Tax planning is legal planning activities for tax savings, meaning tax payers make operation plans within the national policy framework and choose operation programs favorable to tax savings.Along with a maturing socialist market economy system in China, tax planning is becoming an integral part of enterprise management and operation.For a better tax planning, enterprises have to fully understand the meaning, get proficient at relevant strategies, and apply these methods to save taxes and realize the maximization of enterprise value while considering the actual situation.

  4. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  5. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  6. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  7. What's an Asthma Action Plan?

    Science.gov (United States)

    ... Educators Search English Español What's an Asthma Action Plan? KidsHealth / For Parents / What's an Asthma Action Plan? ... acción contra el asma? What's an Asthma Action Plan? An asthma action plan (or management plan) is ...

  8. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  9. Single-employer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active single-employer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  10. 'Plans are useless'.

    Science.gov (United States)

    Bland, Michael

    2013-01-01

    An essential element in crisis recovery is the protection and/or recovery of reputation. This calls for a crisis communications function that is of more than passing interest to the business continuity specialist and which presents two major challenges in this era of process-driven management: (1) it is an inexact science, more about common sense, psychology, empathy and 'playing it by ear' than about box ticking; (2) it does not lend itself to detailed, rigid plans, although some degree of planning is essential. This paper outlines a flexible approach that will help the crisis team to develop a workable communications plan that strikes a balance between being too detailed and too sketchy. It argues that the whole management team should be involved in developing the plan and sets a number of questions, which, on being answered, will help a realistic, achievable and effective plan to evolve.

  11. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  12. SU-D-BRD-04: The Impact of Automatic Radiation Therapy Plan Checks in Treatment Planning

    International Nuclear Information System (INIS)

    Gopan, O; Yang, F; Ford, E

    2015-01-01

    Purpose: The physics plan check verifies various aspects of a treatment plan after dosimetrists have finished creating the plan. Some errors in the plan which are caught by the physics check could be caught earlier in the departmental workflow. The purpose of this project was to evaluate a plan checking script that can be run within the treatment planning system (TPS) by the dosimetrists prior to plan approval and export to the record and verify system. Methods: A script was created in the Pinnacle TPS to automatically check 15 aspects of a plan for clinical practice conformity. The script outputs a list of checks which the plan has passed and a list of checks which the plan has failed so that appropriate adjustments can be made. For this study, the script was run on a total of 108 plans: IMRT (46/108), VMAT (35/108) and SBRT (27/108). Results: Of the plans checked by the script, 77/108 (71%) failed at least one of the fifteen checks. IMRT plans resulted in more failed checks (91%) than VMAT (51%) or SBRT (63%), due to the high failure rate of an IMRT-specific check, which checks that no IMRT segment < 5 MU. The dose grid size and couch removal checks caught errors in 10% and 14% of all plans – errors that ultimately may have resulted in harm to the patient. Conclusion: Approximately three-fourths of the plans being examined contain errors that could be caught by dosimetrists running an automated script embedded in the TPS. The results of this study will improve the departmental workflow by cutting down on the number of plans that, due to these types of errors, necessitate re-planning and re-approval of plans, increase dosimetrist and physician workload and, in urgent cases, inconvenience patients by causing treatment delays

  13. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  14. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  15. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  16. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  17. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  18. Ontological Planning

    Directory of Open Access Journals (Sweden)

    Ahmet Alkan

    2017-12-01

    • Is it possible to redefine ontology within the hierarchical structure of planning? We are going to seek answers to some of these questions within the limited scope of this paper and we are going to offer the rest for discussion by just asking them. In light of these assessments, drawing attention, based on ontological knowledge relying on the wholeness of universe, to the question, on macro level planning, of whether or not the ontological realities of man, energy and movements of thinking can provide macro data for planning on a universal level as important factors affecting mankind will be one of the limited objectives of the paper.

  19. Comparison of attitudes related with family planning methods before and after effective family planning counseling.

    Directory of Open Access Journals (Sweden)

    Esra Esim Büyükbayrak

    2010-09-01

    Full Text Available Objective: To evaluate the effect of family planning counseling on the changeover of the family planning method and to determine level of knowledge of participants on family planning methods and their attitude towards changeover of the method after counseling. Setting: Kartal education and reseach hospital obstetrics and gynecology clinic, department of family planning. Patients. 500 consecutive women applying to family planning department for any reason. Interventions: Effective family planning counseling service was given to each participant then a questioner containin 14 questions was applied with face to face technique. Main Outcome Measures: Attitude towards family planning counseling, comparison of the preference of family planning method before and after family planning counseling service and influential sociodemographic parameters on method choise were studied. Results: 45,2% of the participants were not taken family planning counseling service before. knowledge on family planning methods was sufficient in 25,2% of the participants, insufficient in 56,8% of the participants and 18% of the participants reported that they have no idea. 57,8% of the participants change mind about family planning counseling. 52,2% of the participants changeover perious method after counseling. 99,4% of the participants said that family planning counseling service should be given to every women. Preference of family planning method before and after family planning counseling service was statistically significantly different (p<0.01. Educational level, income and age were found to be influential sociodemographic factors for method preference. Conclusions: Effective family planning counseling service is found to have favorable effect on attitude and knowledge about family planning methods. Modern method usage increase as educational level and income of the participants increase.

  20. Planning for What Kind of Teaching? Supporting Cooperating Teachers as Teachers of Planning

    Science.gov (United States)

    Norman, Patricia J.

    2011-01-01

    Planning is a central task of teaching and a central focus in learning to teach. But what does planning entail, and how is planning best learned? What challenges do experienced teachers serving as school-based teacher educators face in becoming teachers of planning? What role can university teacher educators play in helping mentor teachers learn…

  1. Conference Planning.

    Science.gov (United States)

    Carter, Richard

    1982-01-01

    Presents an overview of the management planning technique known as Break Even Analysis and outlines its use as a tool in financial planning for organizations intending to conduct or sponsor a conference, seminar, or workshop. Three figures illustrating Break Even Analysis concepts and a Break Even Analysis worksheet are included. (JL)

  2. Communicative planning as counter-power

    DEFF Research Database (Denmark)

    Elling, Bo

    2017-01-01

    This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms – traditi......This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms...... – traditional synoptic, incremental and participatory planning – and a critical discussion of different theories within the latter. In the light of this, it is argued that, in practice, planning authorities most often regard public participation as a problem, rather than as a potential. The article dismisses...... this conception and (a) conceptualizes planning on the basis of a Habermasian theory of communicative action and power, (b) shows that the participation of citizens is necessary to secure the inclusion of ethical and aesthetic rationalities in the planning process, and also that (c) citizens may constitute...

  3. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    International Nuclear Information System (INIS)

    Jiang, S; Yang, Y; Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X

    2015-01-01

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan

  4. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, S [UT MD Anderson Cancer Center (United States); Tianjin Medical University Cancer Institute and Hospital (China); Yang, Y [UT MD Anderson Cancer Center (United States); Tianjin First Center Hospital (China); Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X [UT MD Anderson Cancer Center (United States)

    2015-06-15

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.

  5. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  6. Utility planning for decommissioning

    International Nuclear Information System (INIS)

    Williams, D.H.

    1982-01-01

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  7. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  8. Scenario-based transportation planning with involvement of metropolitan planning organizations.

    Science.gov (United States)

    2009-01-01

    The Office of Virginia's Secretary of Transportation identified 21 transportation policies and 42 performance criteria in Virginia's long-range multimodal transportation plan, VTrans2025. A subsequent planning effort, VTrans2035, provided direction f...

  9. 7 CFR 1207.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plan. 1207.303 Section 1207.303 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.303 Plan. Plan means this potato research and...

  10. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  11. The Mission Operations Planning Assistant

    Science.gov (United States)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  12. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  13. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  14. Financial planning considerations at retirement.

    Science.gov (United States)

    Cole, R J

    1998-03-01

    The process of retirement planning is a difficult one for a physician. The Planning process should address the areas of Investment Planning, Estate Planning, and Risk Management. This article examines each of these dimensions with special emphasis on Modern Portfolio Theory as the basis for investment planning.

  15. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  16. Behavior-based evacuation planning

    KAUST Repository

    Rodriguez, Samuel

    2010-05-01

    In this work, we present a formulation of an evacuation planning problem that is inspired by motion planning and describe an integrated behavioral agent-based and roadmap-based motion planning approach to solve it. Our formulation allows users to test the effect on evacuation of a number of different environmental factors. One of our main focuses is to provide a mechanism to investigate how the interaction between agents influences the resulting evacuation plans. Specifically, we explore how various types of control provided by a set of directing agents effects the overall evacuation planning strategies of the evacuating agents. ©2010 IEEE.

  17. Behavior-based evacuation planning

    KAUST Repository

    Rodriguez, Samuel; Amato, Nancy M

    2010-01-01

    In this work, we present a formulation of an evacuation planning problem that is inspired by motion planning and describe an integrated behavioral agent-based and roadmap-based motion planning approach to solve it. Our formulation allows users to test the effect on evacuation of a number of different environmental factors. One of our main focuses is to provide a mechanism to investigate how the interaction between agents influences the resulting evacuation plans. Specifically, we explore how various types of control provided by a set of directing agents effects the overall evacuation planning strategies of the evacuating agents. ©2010 IEEE.

  18. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  19. Treatment planning for MLC based robotic radiosurgery for brain metastases: plan comparison with circular fields and suggestions for planning strategies

    Directory of Open Access Journals (Sweden)

    Schmitt Daniela

    2017-09-01

    Full Text Available To evaluate the possible range of application of the new InCise2 MLC for the CyberKnife M6 system in brain radiosurgery, a plan comparison was made for 10 brain metastases sized between 1.5 and 9cm3 in 10 patients treated in a single fraction each. The target volumes consist of a PTV derived by expanding the GTV by 1mm and were chosen to have diversity in the cohort regarding regularity of shape, location and the structures needed to be blocked for beam transmission in the vicinity. For each case, two treatment plans were optimized: one using the MLC and one using the IRIS-collimator providing variable circular fields. Plan re-quirements were: dose prescription to the 70% isodose line (18 or 20Gy, 100% GTV coverage, ≥98% PTV coverage, undisturbed central high dose region (95% of maximum dose and a conformity index as low as possible. Plan com-parison parameters were: conformity index (CI, high-dose gradient index (GIH, low-dose gradient index (GIL, total number of monitor units (MU and expected treatment time (TT. For all cases, clinically acceptable plans could be gen-erated with the following results (mean±SD for CI, GIH, GIL, MU and TT, respectively for the MLC plans: 1.09±0.03, 2.77±0.26, 2.61±0.08, 4514±830MU and 27±5min and for the IRIS plans: 1.05±0.01, 3.00±0.35, 2.46±0.08, 8557±1335MU and 42±7min. In summary, the MLC plans were on average less conformal and had a shallower dose gradient in the low dose region, but a steeper dose gradient in the high dose region. This is accompanied by a smaller vol-ume receiving 10Gy. A plan by plan comparison shows that usage of the MLC can spare about one half of the MUs and one third of treatment time. From these experiences and results suggestions for MLC planning strategy can be de-duced.

  20. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  1. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  2. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  3. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  4. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  5. Informal Planning in Depopulating Rural Areas : A resource-based view on informal planning practices

    NARCIS (Netherlands)

    Syssner, Josefina; Meijer, M.

    2017-01-01

    Planning research has increasingly recognised that planning in depopulating areas differs from planning in growth areas. Several studies have sought to identify planning theories and strategies that are capable of meeting the challenges presented by depopulating areas. However, most of these studies

  6. Maternal and newborn outcomes in planned home birth vs planned hospital births: a metaanalysis.

    Science.gov (United States)

    Wax, Joseph R; Lucas, F Lee; Lamont, Maryanne; Pinette, Michael G; Cartin, Angelina; Blackstone, Jacquelyn

    2010-09-01

    We sought to systematically review the medical literature on the maternal and newborn safety of planned home vs planned hospital birth. We included English-language peer-reviewed publications from developed Western nations reporting maternal and newborn outcomes by planned delivery location. Outcomes' summary odds ratios with 95% confidence intervals were calculated. Planned home births were associated with fewer maternal interventions including epidural analgesia, electronic fetal heart rate monitoring, episiotomy, and operative delivery. These women were less likely to experience lacerations, hemorrhage, and infections. Neonatal outcomes of planned home births revealed less frequent prematurity, low birthweight, and assisted newborn ventilation. Although planned home and hospital births exhibited similar perinatal mortality rates, planned home births were associated with significantly elevated neonatal mortality rates. Less medical intervention during planned home birth is associated with a tripling of the neonatal mortality rate. Copyright 2010 Mosby, Inc. All rights reserved.

  7. Understanding health insurance plans

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/patientinstructions/000879.htm Understanding health insurance plans To use the sharing features on this ... plan for you and your family. Types of Health Insurance Plans Depending on how you get your health ...

  8. Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  9. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  10. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  11. The interventional radiology business plan.

    Science.gov (United States)

    Beheshti, Michael V; Meek, Mary E; Kaufman, John A

    2012-09-01

    Strategic planning and business planning are processes commonly employed by organizations that exist in competitive environments. Although it is difficult to prove a causal relationship between formal strategic/business planning and positive organizational performance, there is broad agreement that formal strategic and business plans are components of successful organizations. The various elements of strategic plans and business plans are not common in the vernacular of practicing physicians. As health care becomes more competitive, familiarity with these tools may grow in importance. Herein we provide an overview of formal strategic and business planning, and offer a roadmap for an interventional radiology-specific plan that may be useful for organizations confronting competitive and financial threats. Copyright © 2012 SIR. Published by Elsevier Inc. All rights reserved.

  12. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

  13. Biodiesel Test Plan

    Science.gov (United States)

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  14. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  15. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  16. Emerging digital plan data – New research perspectives into planning practice and evaluation

    DEFF Research Database (Denmark)

    Fertner, Christian

    Profound digitalization in public administration in many European countries is gaining momentum and spatial planning is no exception. International policies as e.g. EU’s INSPIRE directive from 2007, EU’s strategy for a digital single market or also the Arctic SDI Strategy from 2015 are driving......) planning databases and portals. Denmark is one of the forerunners in that digitalization, e.g. with its digital plan platform “plandata.dk” which, since 2006, collects all regional, municipal and local plans in a geodatabase. This includes e.g. over 33,000 local plans which are currently effective...

  17. Countywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Assessing the Utility of the LTFSS Plan Service Delivery and Planning Framework

    National Research Council Canada - National Science Library

    Davis, Lois

    2002-01-01

    ...) is the lead agency responsible for implementing the evaluation of the LTFSS Plan. On December 5, 2000, the Board approved the implementation plan for the evaluation of the LTFSS Plan, LTFSS Project #46...

  18. Energy Efficiency Plan 2009-2012; Energie Efficiency Plan 2009-2012

    Energy Technology Data Exchange (ETDEWEB)

    Meulen, M.M.W. (ed.)

    2009-02-15

    The aim of the Energy Efficiency Plan is to give an overview of the energy conservation plans of the Eindhoven University of Technology in Eindhoven, Netherlands, which must result in efficient use of energy conform the long-range agreements between businesses, industry and organizations and the Dutch government to improve energy efficiency (MJA3) [Dutch] Het doel van het EEP (Energie Efficiency Plan) is het in beeld brengen van de energiebesparingsplannen die leiden tot een efficienter gebruik van energie conform de MJA-3 afspraak (de derde Meerjaren Afspraak)

  19. Family planning management for the migrant population in sending areas. Urban family planning programme.

    Science.gov (United States)

    1997-02-01

    This brief article was adapted from a report by the Longchang County Government, Sichuan Province, China, at the National Conference on Urban Family Planning Programs. The Longchang County family planning program has shifted emphasis since 1990 toward management of out-migrant workers. Overpopulation in the family planning region resulted in each person having about one-sixth of an acre (0.6 mu) of land. There were about 200,000 surplus rural workers. 75,000 migrants left the region in 1995, of which 70,300 had signed birth control contracts and had received family planning certificates. Family planning township agencies in Longchang County increased their IEC and counseling services for migrants and their families. The Longchang County family planning program maintained family planning contacts in receiving areas in order to obtain pregnancy and birth information on the migrant population. During 1991-95 the number of unplanned births declined from 1394 to 71, and 97% of the births were planned.

  20. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  1. Sport event marketing plan

    Directory of Open Access Journals (Sweden)

    Gašović Milan

    2007-01-01

    Full Text Available A marketing plan details how an event organization will compete in the marketplace in terms of its service offerings, promotions and evaluation. During the first stage of the marketing plan process, a number of its consumers (current, former and prospective and competitors. Marketing objectives are developed and implemented using an action plan. The marketing plan objectives are evaluated using an objective-discrepancy approach to determine the extent to which they were attained.

  2. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  3. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  4. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  5. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  6. Making a Quit Plan

    Science.gov (United States)

    ... BACK CLOSE SMOKEFREE.GOV HOME Create My Quit Plan Quitting starts now. Make a plan . Step 1 of 7 mark Step 2 of ... boosts your chances of success. Build a quit plan to get ready and find out what to ...

  7. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  8. A Planning Palimpsest

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay; Gutzon Larsen, Henrik; Olesen, Kristian

    2015-01-01

    In this article, we analyse the evolution and transformation of Danish spatial planning from its tentative origins in liberalist politics, through its rise as a central feature of the welfare state project, to its more recent entrepreneurial forms in a context of neoliberalisation. The article...... demonstrates how transformations of Danish spatial planning discourses and practices must be understood in context of previous discourses and practices sedimented as layers of meaning and materiality through time and over space. These layers do not completely overlay one another, but present a palimpsest...... saturated with contradictions as well as possibilities. We propose the notion of the ‘planning palimpsest’ as a helpful metaphor for drawing attention to the historical-geographical characteristics of planning discourses and practices....

  9. 26 CFR 1.381(c)(11)-1 - Contributions to pension plan, employees' annuity plans, and stock bonus and profit-sharing plans.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 4 2010-04-01 2010-04-01 false Contributions to pension plan, employees... TAXES Insolvency Reorganizations § 1.381(c)(11)-1 Contributions to pension plan, employees' annuity... or transferor corporation in respect of any pension, annuity, stock bonus, or profit-sharing plan. (b...

  10. Regional manpower planning

    OpenAIRE

    G. Erens; P. Salamink; C.A. Van der Merwe CA

    2003-01-01

    Particular problems come to the fore when planning development at the regional level. These range from the complexities of the multifarious interactions between the sect oral and local components of the region to the necessity of achieving extensive participation of regional stakeholders in the planning process. In this paper a methodology for regional manpower planning is proposed. The methodology is designed to accommodate the full range of problems by applying a systems approach which is b...

  11. Data book on new energy technology in FY 1997. Wind power generation; Shin energy gijutsu kaihatsu kankei data shu sakusei chosa. Furyoku hatsuden

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    It is an urgent necessity for Japan to promote the technological development and accelerate the introduction and diffusion of new energy. In order to diffuse and enlighten the introduction of new energy technology efficiently, it is necessary to compile various information regarding new energy in a comprehensive and systematic way, and formulate a database. Aiming at the systematic formulation of data on new energy, this survey focuses on the field of wind power generation system (WPS) and provides a collection of the latest published data on WPS, particularly regarding the worldwide installed wind power capacity, support plan and government policies, current situations of WPS market, and major technical characteristics of typical wind turbines. This report consists of the significance of wind energy, world market of wind turbines, government policies, international wind energy development, subsidies for wind energy, procedures of wind turbine system installation, governmental measures for wind energy development, subsidiary companies and organizations, basis of wind energy, and Japan`s wind energy development in 1997

  12. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  13. SBNCT plan: A 3-dimensional treatment planning system for boron neutron capture therapy

    International Nuclear Information System (INIS)

    Reinstein, L.E.; Ramsay, E.B.; Gajewski, J.; Ramamoorthy, S.; Meek, A.G.

    1993-01-01

    The need for accurate and comprehensive 3-dimensional treatment planning for boron neutron capture therapy (BNCT) has been debated for the past several years. Although many argue against the need for elaborate and expensive treatment planning programs which mimic conventional radiotherapy planning systems, it is clear that in order to realize significant gains over conventional fractionated radiation therapy, patients must be treated to the edge of normal tissue tolerance. Just how close to this edge is dictated by the uncertainties in dosimetry. Hence the focus of BNCT planning is the determination of dose distribution throughout normal tissue volumes. Although precise geometric manipulation of the epithermal neutron beam is not achievable, the following variables play an important role in BNCT optimization: patient orientation, dose fractionation, number of fields, megawatt-minutes per fraction, use of surface bolus, and use of collimation. Other variables which are not as easily adjustable and would not, therefore, be part of treatment planning optimization, include external patient contour, internal patient heterogeneities, boron compound distributions, and RBE's. The boron neutron capture therapy planning system developed at SUNY Stony Brook (SBNCT-Plan) was designed as an interactive graphic tool to assist the radiation oncologist in generating the optimum plan for a neutron capture treatment

  14. Influenza pandemic planning guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  15. Investigation of stomach diseases in atomic bomb survivors, (3)

    International Nuclear Information System (INIS)

    Tsubota, Motoki; Ito, Chikako

    1980-01-01

    Mass examinations of the stomach were performed on 13,412 a-bomb survivors from Oct. 1975 to Mar. 1979. The necessity rate for detailed examinations was 13.6% on the average, and it was a little lower than the average in Japan. That in women was higher than that in men. The performance rate of detailed examinations was very high (91.8%), which might be influenced by active appeals to have detailed examinations. The estimated discovery rate of stomach cancer was 0.27% on the average, and it was higher than that in mass examinations of Chugoku and Shikoku districts. A relationship between the estimated discovery rate of stomach cancer and exposure conditions was not clarified. The discovery rate of stomach cancer was supposed to be influenced strongly by aging of a-bomb survivors. (Tsunoda, M.)

  16. Language Planning: Corpus Planning.

    Science.gov (United States)

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  17. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  18. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans

    International Nuclear Information System (INIS)

    Dzierma, Yvonne; Nuesken, Frank; Licht, Norbert; Ruebe, Christian

    2013-01-01

    The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5% local dose and 3 mm distance

  19. Emergency plan belgian experience

    International Nuclear Information System (INIS)

    Clymans, A.

    1989-01-01

    The Chernobyl disaster prompted authorities in Belgium to carry out a comprehensive review of all emergency plans and, in particular, those designed specifically for nuclear accidents. This review was aimed at determining what type of plans existed and to what extent such plans were operational. This paper sets out to present a broad overview of different aspects of this problem: organization of public emergency plans, co-ordination of operations, merits and demerits of centralization as opposed to decentralization, planning zones, obligation to release information to the public and relations with the media, and finally the international dimension to the problem. The author expresses the hope that the latter area will inspire practical suggestions [fr

  20. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  1. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  2. Person-Centered Transition Planning.

    Science.gov (United States)

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…

  3. NACS Store Planning Manual.

    Science.gov (United States)

    College Store Journal, 1979

    1979-01-01

    Topics discussed by the NACS Store Planning/Renovation Committees in this updated version of the college store renovation manual include: short- and long-range planning, financial considerations, professional planning assistance, the store's image and business character, location considerations, building requirements, space requirements, fixtures,…

  4. Influence of increment of gantry angle and number of arcs on esophageal volumetric modulated arc therapy planning in Monaco planning system: A planning study

    Directory of Open Access Journals (Sweden)

    L Nithya

    2014-01-01

    Full Text Available The objective of this study was to analyze the influence of the increment of gantry angle and the number of arcs on esophageal volumetric modulated arc therapy plan. All plans were done in Monaco planning system for Elekta Synergy linear accelerator with 80 multileaf collimator (MLC. Volumetric modulated arc therapy (VMAT plans were done with different increment of gantry angle like 15 o , 20 o , 30 o and 40 o . The remaining parameters were similar for all the plans. The results were compared. To compare the plan quality with number of arcs, VMAT plans were done with single and dual arc with increment of gantry angle of 20 o . The dose to gross tumor volume (GTV for 60 Gy and planning target volume (PTV for 48 Gy was compared. The dosimetric parameters D 98% , D 95% , D 50% and D max of GTV were analyzed. The homogeneity index (HI and conformity index (CI of GTV were studied and the dose to 98% and 95% of PTV was analyzed. Maximum dose to spinal cord and planning risk volume of cord (PRV cord was compared. The Volume of lung receiving 10 Gy, 20 Gy and mean dose was analyzed. The volume of heart receiving 30 Gy and 45 Gy was compared. The volume of normal tissue receiving greater than 2 Gy and 5 Gy was compared. The number of monitor units (MU required to deliver the plans were compared. The plan with larger increment of gantry angle proved to be superior to smaller increment of gantry angle plans in terms of dose coverage, HI, CI and normal tissue sparing. The number of arcs did not make any difference in the quality of the plan.

  5. Feasibility of identification of gamma knife planning strategies by identification of pareto optimal gamma knife plans.

    Science.gov (United States)

    Giller, C A

    2011-12-01

    The use of conformity indices to optimize Gamma Knife planning is common, but does not address important tradeoffs between dose to tumor and normal tissue. Pareto analysis has been used for this purpose in other applications, but not for Gamma Knife (GK) planning. The goal of this work is to use computer models to show that Pareto analysis may be feasible for GK planning to identify dosimetric tradeoffs. We define a GK plan A to be Pareto dominant to B if the prescription isodose volume of A covers more tumor but not more normal tissue than B, or if A covers less normal tissue but not less tumor than B. A plan is Pareto optimal if it is not dominated by any other plan. Two different Pareto optimal plans represent different tradeoffs between dose to tumor and normal tissue, because neither plan dominates the other. 'GK simulator' software calculated dose distributions for GK plans, and was called repetitively by a genetic algorithm to calculate Pareto dominant plans. Three irregular tumor shapes were tested in 17 trials using various combinations of shots. The mean number of Pareto dominant plans/trial was 59 ± 17 (sd). Different planning strategies were identified by large differences in shot positions, and 70 of the 153 coordinate plots (46%) showed differences of 5mm or more. The Pareto dominant plans dominated other nearby plans. Pareto dominant plans represent different dosimetric tradeoffs and can be systematically calculated using genetic algorithms. Automatic identification of non-intuitive planning strategies may be feasible with these methods.

  6. Multicriteria optimization informed VMAT planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Huixiao; Craft, David L.; Gierga, David P., E-mail: dgierga@partners.org

    2014-04-01

    We developed a patient-specific volumetric-modulated arc therapy (VMAT) optimization procedure using dose-volume histogram (DVH) information from multicriteria optimization (MCO) of intensity-modulated radiotherapy (IMRT) plans. The study included 10 patients with prostate cancer undergoing standard fractionation treatment, 10 patients with prostate cancer undergoing hypofractionation treatment, and 5 patients with head/neck cancer. MCO-IMRT plans using 20 and 7 treatment fields were generated for each patient on the RayStation treatment planning system (clinical version 2.5, RaySearch Laboratories, Stockholm, Sweden). The resulting DVH of the 20-field MCO-IMRT plan for each patient was used as the reference DVH, and the extracted point values of the resulting DVH of the MCO-IMRT plan were used as objectives and constraints for VMAT optimization. Weights of objectives or constraints of VMAT optimization or both were further tuned to generate the best match with the reference DVH of the MCO-IMRT plan. The final optimal VMAT plan quality was evaluated by comparison with MCO-IMRT plans based on homogeneity index, conformity number of planning target volume, and organ at risk sparing. The influence of gantry spacing, arc number, and delivery time on VMAT plan quality for different tumor sites was also evaluated. The resulting VMAT plan quality essentially matched the 20-field MCO-IMRT plan but with a shorter delivery time and less monitor units. VMAT plan quality of head/neck cancer cases improved using dual arcs whereas prostate cases did not. VMAT plan quality was improved by fine gantry spacing of 2 for the head/neck cancer cases and the hypofractionation-treated prostate cancer cases but not for the standard fractionation–treated prostate cancer cases. MCO-informed VMAT optimization is a useful and valuable way to generate patient-specific optimal VMAT plans, though modification of the weights of objectives or constraints extracted from resulting DVH of MCO

  7. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  8. Planning for exercises of the Federal Radiological Monitoring and Assessment Plan

    International Nuclear Information System (INIS)

    Adler, M.V.

    1985-11-01

    This report is to be used in planning radiological emergency exercises to test the Federal Radiological Monitoring and Assessment Plan (FRMAP). Although developed for this specific purpose, the document also contains material that may be useful for planning other types of exercises. This report describes the types of exercises that might be used, the steps in planning and conducting the exercises, and the special considerations required for exercises to test the FRMAP. FRMAP exercises typically involve several federal and state agencies. General and specific objectives that could guide these exercises, as well as the possible activities of all the participants - players, controllers, and evaluators - are discussed. The resources that each participating federal agency might provide during an exercise are listed

  9. Complexity Results in Epistemic Planning

    DEFF Research Database (Denmark)

    Bolander, Thomas; Jensen, Martin Holm; Schwarzentruber, Francois

    2015-01-01

    Epistemic planning is a very expressive framework that extends automated planning by the incorporation of dynamic epistemic logic (DEL). We provide complexity results on the plan existence problem for multi-agent planning tasks, focusing on purely epistemic actions with propositional preconditions...

  10. Is it possible for knowledge-based planning to improve intensity modulated radiation therapy plan quality for planners with different planning experiences in left-sided breast cancer patients?

    Science.gov (United States)

    Wang, Juanqi; Hu, Weigang; Yang, Zhaozhi; Chen, Xiaohui; Wu, Zhiqiang; Yu, Xiaoli; Guo, Xiaomao; Lu, Saiquan; Li, Kaixuan; Yu, Gongyi

    2017-05-22

    Knowledge-based planning (KBP) is a promising technique that can improve plan quality and increase planning efficiency. However, no attempts have been made to extend the domain of KBP for planners with different planning experiences so far. The purpose of this study was to quantify the potential gains for planners with different planning experiences after implementing KBP in intensity modulated radiation therapy (IMRT) plans for left-sided breast cancer patients. The model libraries were populated with 80 expert clinical plans from treated patients who previously received left-sided breast-conserving surgery and IMRT with simultaneously integrated boost. The libraries were created on the RapidPlan TM . 6 planners with different planning experiences (2 beginner planners, 2 junior planners and 2 senior planners) generated manual and KBP optimized plans for additional 10 patients, similar to those included in the model libraries. The plan qualities were compared between manual and KBP plans. All plans were capable of achieving the prescription requirement. There were almost no statistically significant differences in terms of the planning target volume (PTV) coverage and dose conformality. It was demonstrated that the doses for most of organs-at-risk (OARs) were on average lower or equal in KBP plans compared to manual plans except for the senior planners, where the very small differences were not statistically significant. KBP data showed a systematic trend to have superior dose sparing at most parameters for the heart and ipsilateral lung. The observed decrease in the doses to these OARs could be achieved, particularly for the beginner and junior planners. Many differences were statistically significant. It is feasible to generate acceptable IMRT plans after implementing KBP for left-sided breast cancer. KBP helps to effectively improve the quality of IMRT plans against the benchmark of manual plans for less experienced planners without any manual intervention. KBP

  11. AECB strategic plan 1999

    International Nuclear Information System (INIS)

    1999-03-01

    This strategic plan provides the direction and focus required to successfully carry out our mandate in an efficient and effective manner over the next two to three years. It gives broad corporate direction by identifying where efforts need to be focussed, and therefore provides guidance for setting priorities and allocating resources. While we cannot ignore any aspect of our mandate, we must recognize that we will always have more work to do than can be accomplished within the resources available to us. Therefore we must set priorities and develop appropriate management systems to ensure that our major efforts and our resources are being directed towards those priorities. Our strategic plan is not a static document. We will always be faced with new challenges, and our strategies for meeting those challenges will also have to change. Therefore our strategic plan must be seen as a guide that reflects both the ever-changing environment and our ability to deal with new or evolving changes effectively. This plan is not intended to be a detailed operational plan. Each directorate must develop its own operational plans and procedures based on the directions in this strategic plan, and on corporate priorities and policies. (author)

  12. Animation of planning algorithms

    OpenAIRE

    Sun, Fan

    2014-01-01

    Planning is the process of creating a sequence of steps/actions that will satisfy a goal of a problem. The partial order planning (POP) algorithm is one of Artificial Intelligence approach for problem planning. By learning G52PAS module, I find that it is difficult for students to understand this planning algorithm by just reading its pseudo code and doing some exercise in writing. Students cannot know how each actual step works clearly and might miss some steps because of their confusion. ...

  13. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  14. Holiday Meal Planning

    Science.gov (United States)

    ... Count Glycemic Index Low-Calorie Sweeteners Sugar and Desserts Fitness Exercise & Type 1 Diabetes Get Started Safely ... plan ahead. Fitting in Sweets Learn about eating desserts on special occasions. In this section Planning Meals ...

  15. DASH Eating Plan

    Science.gov (United States)

    ... Approaches to Stop Hypertension. It is an eating plan that is based on research studies sponsored by ... risk of getting heart disease. The DASH eating plan Emphasizes vegetables, fruits, and whole-grains Includes fat- ...

  16. Planning a pregnancy

    Science.gov (United States)

    ... on Twitter Facebook Pinterest Email Print Planning a pregnancy Lupus Foundation of America September 27, 2017 Resource ... History or presence of antiphospholipid antibodies Planning Your Pregnancy Although many lupus pregnancies will have no complications, ...

  17. Automatic treatment plan re-optimization for adaptive radiotherapy guided with the initial plan DVHs

    International Nuclear Information System (INIS)

    Li, Nan; Zarepisheh, Masoud; Uribe-Sanchez, Andres; Moore, Kevin; Tian, Zhen; Zhen, Xin; Graves, Yan Jiang; Gautier, Quentin; Mell, Loren; Jia, Xun; Jiang, Steve; Zhou, Linghong

    2013-01-01

    Adaptive radiation therapy (ART) can reduce normal tissue toxicity and/or improve tumor control through treatment adaptations based on the current patient anatomy. Developing an efficient and effective re-planning algorithm is an important step toward the clinical realization of ART. For the re-planning process, manual trial-and-error approach to fine-tune planning parameters is time-consuming and is usually considered unpractical, especially for online ART. It is desirable to automate this step to yield a plan of acceptable quality with minimal interventions. In ART, prior information in the original plan is available, such as dose–volume histogram (DVH), which can be employed to facilitate the automatic re-planning process. The goal of this work is to develop an automatic re-planning algorithm to generate a plan with similar, or possibly better, DVH curves compared with the clinically delivered original plan. Specifically, our algorithm iterates the following two loops. An inner loop is the traditional fluence map optimization, in which we optimize a quadratic objective function penalizing the deviation of the dose received by each voxel from its prescribed or threshold dose with a set of fixed voxel weighting factors. In outer loop, the voxel weighting factors in the objective function are adjusted according to the deviation of the current DVH curves from those in the original plan. The process is repeated until the DVH curves are acceptable or maximum iteration step is reached. The whole algorithm is implemented on GPU for high efficiency. The feasibility of our algorithm has been demonstrated with three head-and-neck cancer IMRT cases, each having an initial planning CT scan and another treatment CT scan acquired in the middle of treatment course. Compared with the DVH curves in the original plan, the DVH curves in the resulting plan using our algorithm with 30 iterations are better for almost all structures. The re-optimization process takes about 30

  18. Hyperthermia treatment planning

    International Nuclear Information System (INIS)

    Lagendijk, J.J.W.

    2000-01-01

    The development of hyperthermia, the treatment of tumours with elevated temperatures in the range of 40-44 deg. C with treatment times over 30 min, greatly benefits from the development of hyperthermia treatment planning. This review briefly describes the state of the art in hyperthermia technology, followed by an overview of the developments in hyperthermia treatment planning. It particularly highlights the significant problems encountered with heating realistic tissue volumes and shows how treatment planning can help in designing better heating technology. Hyperthermia treatment planning will ultimately provide information about the actual temperature distributions obtained and thus the tumour control probabilities to be expected. This will improve our understanding of the present clinical results of thermoradiotherapy and thermochemotherapy, and will greatly help both in optimizing clinical heating technology and in designing optimal clinical trials. (author)

  19. External plans for radiological emergency; Plan de emergencia radiologica externo

    Energy Technology Data Exchange (ETDEWEB)

    Suarez, G; Vizuet G, J; Benitez S, J A [Instituto Nacional de Investigaciones Nucleares, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    1999-07-01

    Since 1989, the National Institute of Nuclear Research in Mexico shares in the task of Food and Water Control corresponding to the FT-86 task force of External Plans for Radiological Emergency (PERE), in charge of the Veracruz Health Services. In the PERE preparation stage previous actions are necessary developed for the preparation and updating of this plan and the task organization with the purpose to maintaining standing and operable in any time and circumstance, the capability to response in the face of an emergency. This stage englobes activities which must be realized before to carry out the Plan as they are the specialized training of personnel which participates and the execution of exercises and simulacrums. Until 1998, training and exercises for this task had been realized under diverse possible sceneries but in conditions that simulated the presence of radioactive material. For this reason, it should be emphasized the training realized during the days 6th, 7th, 8th July, 1999, in the emergency planning zone of the Plan, which to carry out using radioactive material. The National Institute of Nuclear Research had in charge of the training. This work describes all the activities for the realization of this training. (Author)

  20. Canada's green plan: Summary. Le plan vert du Canada: Resume

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    A summary is presented of Canada's Green Plan, a comprehensive action plan to ensure a healthy environment for the future. The plan defines targets and schedules which will drive federal environmental initiatives, and incorporates concepts of sustainable development. Elements of the plan include initiatives to combat and prevent water pollution; control ocean dumping; control smog-causing emissions; provide tighter air pollution standards; provide for sound waste management according to the principles of reduce, reuse, recycle, and recover; assess and control chemical wastes; sustain Canadian forests and maintain their diversity while shifting forest management from sustained yield to sustainable development; maintain and enhance environmental sustainability in the agro-food sector and the fishery sector; preserve and protect national parks and wildlife; and preserve and enhance the integrity, health, biodiversity and productivity of Arctic ecosystems. With respect to global-scale problems, measures will be taken to stabilize greenhouse gas emissions, limit acid rain-related emissions, and phase out the use of ozone-depleting substances. The plan also intends to improve Canada's capability to respond to environmental emergencies, improve environmental decision-making by strengthening and building of partnerships, promote environmental science research and development, and make effective and balanced use of enviromental laws, with market-based approaches for environmental protection.

  1. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...

  2. Generational Pension Plan Designs

    NARCIS (Netherlands)

    Huang, Xiaohong; Mahieu, Ronald

    2010-01-01

    We propose a generational plan for the occupational pension provision in which people from the same generation are pooled in a generational fund. Each fund can set its own policies independently. This plan provides the benefits of differentiation missing in the prevailing collective plan and the

  3. Language Policy and Planning.

    Science.gov (United States)

    Takala, Sauli; Sajavaara, Kari

    2000-01-01

    Focuses on foreign language planning, or the planned changes in foreign language instructional systems and in uses of languages in different social contexts with special reference to the Nordic and Baltic countries. Special attention is given to the relationship between language planning and evaluation. (Author/VWL)

  4. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  5. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  6. Role and importance of the spatial planning plan in the Republic of Serbia

    Directory of Open Access Journals (Sweden)

    Marinković Goran

    2017-01-01

    Full Text Available When it comes to spatial planning, it is impossible to circumvent the cadastre, which in essence is the basis for the preparation and realization of planning documents. Considering this fact in this paper, an analysis of the importance and role of the cadastre for spatial planning was carried out, whereby the obligations and procedures implemented by the cadastre in the spatial and urban planning situation in the Republic of Serbia are described in detail.

  7. Employer-sponsored pension plans

    Directory of Open Access Journals (Sweden)

    Rakonjac-Antić Tatjana N.

    2004-01-01

    Full Text Available Apart from pension plans within social insurance, in developed pension systems there are also available to individuals schemes which may to a large extent ensure a significant part of their total pension. Among them are the following: employer-sponsored pension plans or individual pension plans. The most widely used employer-sponsored pension plan in the USA is 401(k, in which both the employer and the employee contribute to the financing of the pension. These contributions as well as the return to their investment have a preferential tax treatment, i.e. do not enter a tax base. The funds are taxed only when drawn from the account in the form of a pension. This paper aims to present the functioning of 401(k pension plan as the most widely used employer sponsored pension plan in the USA, which is likely, in a modified form, to have an important place within our future reformed pension insurance system.

  8. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  9. Community participation in fire management planning: The Trinity county fire safe council's fire plan

    Science.gov (United States)

    Yvonne Everett

    2008-01-01

    In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...

  10. Robot Plans and Human Plans: Implications for Models of Communication. Technical Report No. 314.

    Science.gov (United States)

    Bruce, Bertram

    People in interaction with others organize their perceptions of a social situation in terms of plans even when the others' plans are poorly formulated. They use their models of others' plans in formulating their own. Much of what occurs in discourse centers on a continual communication about and reformulation of one's own plans and one's own…

  11. Analysing contemporary metropolitan spatial plans in Europe through their institutional context, instrumental content and planning process

    DEFF Research Database (Denmark)

    Elinbaum, Pablo; Galland, Daniel

    2016-01-01

    This article sets out to propose and apply a qualitative framework for thinking about how to analyze and compare metropolitan spatial plans in a milieu of divergent spatial planning traditions and discretionary planning practices. In doing so, the article reviews and develops an understanding...... concerning the institutional context, instrumental content and planning processes associated with four contemporary metropolitan spatial plans in Europe, namely London, Copenhagen, Paris and Barcelona. Through the results of a multiple case study and a subsequent cross comparative analysis, the article...... stresses that contemporary metropolitan spatial plans tend to merge characteristics associated with project-based and strategy-based spatial plans, thus contrasting with the typical land-use character of municipal plans and the often strategic, growth-oriented pursuit of regional plans in Europe...

  12. business plan

    OpenAIRE

    Luzan, Dmitrij

    2009-01-01

    My thesis is dedicated to the business plan of the gastronomic facility. The thesis describes foundation of the company, analyses demand for the gastronomic services. The financial plan is being presented as well. The thesis includes the analysis of the company's environment, suppliers and customers. SWOT analysis, net present value analysis, index of the net present value and other ratio indexes are the parts of this thesis.

  13. A dosimetric comparison between traditionally planned and inverse planned radiation therapy of non-small cell lung cancer

    International Nuclear Information System (INIS)

    Wu, V.W.C.; Sham, J.S.T.; Kwong, D.L.W.

    2003-01-01

    This study applied inverse planning in 3-dimensional conformal radiation therapy (3DCRT) of non-small cell lung cancer (NSCLC) patients and evaluated its dosimetric results by comparison with the forward planning of 3DCRT and inverse planning of intensity modulated radiotherapy (IMRT). For each of the 15 NSCLC patients recruited, the forward 3DCRT, inverse 3DCRT and inverse EVIRT plans were produced using the FOCUS treatment planning system. The dosimetric results and the planner's time of all treatment plans were recorded and compared. The inverse 3DCRT plans demonstrated the best target dose homogeneity among the three planning methods. The tumour control probability of the inverse 3DCRT plans was similar to the forward plans (p 0.217) but inferior to the IMRT plans (p < 0.001). A similar pattern was observed in uncomplicated tumour control. The average planning time for the inverse 3DCRT plans was the shortest and its difference was significant compared with the forward 3DCRT plans (p < 0.001) but not with the IMRT plans (p = 0.276). In conclusion, inverse planning for 3DCRT is a reasonable alternative to the forward planning for NSCLC patients with a reduction of the planner's time. However, further dose escalation and improvement of tumour control have to rely on IMRT. Copyright (2003) Australian Institute of Radiography

  14. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  15. Bounded Intention Planning Revisited

    OpenAIRE

    Sievers Silvan; Wehrle Martin; Helmert Malte

    2014-01-01

    Bounded intention planning provides a pruning technique for optimal planning that has been proposed several years ago. In addition partial order reduction techniques based on stubborn sets have recently been investigated for this purpose. In this paper we revisit bounded intention planning in the view of stubborn sets.

  16. 23 CFR 710.303 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 710.303 Section 710.303 Highways FEDERAL... ESTATE Project Development § 710.303 Planning. State and local governments conduct metropolitan and statewide planning to develop coordinated, financially constrained system plans to meet transportation needs...

  17. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  18. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    International Nuclear Information System (INIS)

    1994-01-01

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams

  19. National Energy Plan II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This volume contains the Administration's second National Energy Plan, as required by section 801 of the Department of Energy Organization Act (Public Law 95-91). A second volume will contain an assessment of the environmental trends associated with the energy futures reported here. Detailed appendices to the Plan will be published separately. The eight chapters and their subtitles are: Crisis and Uncertainty in the World Energy Future (The Immediate Crisis and the Continuing Problem, The Emergence of the Energy Problem, The Uncertainties of the World Energy Future, World Oil Prices, Consequences for the U.S.); The U.S. Energy Future: The Implications for Policy (The Near-, Mid-, and Long-Term, The Strategy in Perspective); Conservation (Historical Changes in Energy Use, Post-Embargo Changes - In Detail, Conservation Policies and Programs, The Role of Conservation); Oil and Gas (Oil, Natural Gas); Coal and Nuclear (Coal, Nuclear, Policy for Coal and Nuclear Power); Solar and Other Inexhaustible Energy Sources (Solar Energy, Geothermal, Fusion, A Strategy for Inexhaustible Resources); Making Decisions Promptly and Fairly (Managing Future Energy Crises: Emergency Planning, Managing the Current Shortfall: The Iranian Response Plan, Managing the Long-Term Energy Problem: The Institutional Framework, Fairness in Energy Policy, Public Participation in the Development of Energy Policy); and NEP-II and the Future (The Second National Energy Plan and the Nation's Energy Future, The Second National Energy Plan and the Economy, Employment and Energy Policy, The Second National Energy Plan and Individuals, The Second National Energy Plan and Capital Markets, and The Second National Energy Plan and the Environment). (ERA citation 04:041097)

  20. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  1. SU-E-T-357: Semi-Automated Knowledge-Based Radiation Therapy (KBRT) Planning for Head-And-Neck Cancer (HNC): Can KBRT Plans Achieve Better Results Than Manual Planning?

    International Nuclear Information System (INIS)

    Lutzky, C; Grzetic, S; Lo, J; Das, S

    2014-01-01

    Purpose: Knowledge Based Radiation Therapy Treatment (KBRT) planning can be used to semi-automatically generate IMRT plans for new patients using constraints derived from previously manually-planned, geometrically similar patients. We investigate whether KBRT plans can achieve greater dose sparing than manual plans using optimized, organspecific constraint weighting factors. Methods: KBRT planning of HNC radiotherapy cases geometrically matched each new (query) case to one of the 105 clinically approved plans in our database. The dose distribution of the planned match was morphed to fit the querys geometry. Dose-volume constraints extracted from the morphed dose distribution were used to run the IMRT optimization with no user input. In the first version, all constraints were multiplied by a weighting factor of 0.7. The weighting factors were then systematically optimized (in order of OARs with increasing separation from the target) to maximize sparing to each OAR without compromising other OARs. The optimized, second version plans were compared against the first version plans and the clinically approved plans for 45 unilateral/bilateral target cases using the dose metrics: mean, median and maximum (brainstem and cord) doses. Results: Compared to the first version, the second version significantly reduced mean/median contralateral parotid doses (>2Gy) for bilateral cases. Other changes between the two versions were not clinically meaningful. Compared to the original clinical plans, both bilateral and unilateral plans in the second version had lower average dose metrics for 5 of the 6 OARs. Compared to the original plans, the second version achieved dose sparing that was at least as good for all OARs and better for the ipsilateral parotid (bilateral) and oral cavity (bilateral/unilateral). Differences in planning target volume coverage metrics were not clinically significant. Conclusion: HNC-KBRT planning generated IMRT plans with at least equivalent dose sparing to

  2. SU-E-T-357: Semi-Automated Knowledge-Based Radiation Therapy (KBRT) Planning for Head-And-Neck Cancer (HNC): Can KBRT Plans Achieve Better Results Than Manual Planning?

    Energy Technology Data Exchange (ETDEWEB)

    Lutzky, C; Grzetic, S; Lo, J; Das, S [Duke University Medical Center, Durham, NC (United States)

    2014-06-01

    Purpose: Knowledge Based Radiation Therapy Treatment (KBRT) planning can be used to semi-automatically generate IMRT plans for new patients using constraints derived from previously manually-planned, geometrically similar patients. We investigate whether KBRT plans can achieve greater dose sparing than manual plans using optimized, organspecific constraint weighting factors. Methods: KBRT planning of HNC radiotherapy cases geometrically matched each new (query) case to one of the 105 clinically approved plans in our database. The dose distribution of the planned match was morphed to fit the querys geometry. Dose-volume constraints extracted from the morphed dose distribution were used to run the IMRT optimization with no user input. In the first version, all constraints were multiplied by a weighting factor of 0.7. The weighting factors were then systematically optimized (in order of OARs with increasing separation from the target) to maximize sparing to each OAR without compromising other OARs. The optimized, second version plans were compared against the first version plans and the clinically approved plans for 45 unilateral/bilateral target cases using the dose metrics: mean, median and maximum (brainstem and cord) doses. Results: Compared to the first version, the second version significantly reduced mean/median contralateral parotid doses (>2Gy) for bilateral cases. Other changes between the two versions were not clinically meaningful. Compared to the original clinical plans, both bilateral and unilateral plans in the second version had lower average dose metrics for 5 of the 6 OARs. Compared to the original plans, the second version achieved dose sparing that was at least as good for all OARs and better for the ipsilateral parotid (bilateral) and oral cavity (bilateral/unilateral). Differences in planning target volume coverage metrics were not clinically significant. Conclusion: HNC-KBRT planning generated IMRT plans with at least equivalent dose sparing to

  3. Planning for Pregnancy

    Science.gov (United States)

    ... Before Pregnancy Home Overview Planning for Pregnancy Women Men Image Library Women Who Want to Become Pregnant Women Who Do Not Want to Become Pregnant Hugging Nutrition Physical Activity Visiting the Doctor Planning for Pregnancy Language: English ( ...

  4. Planning of nets

    International Nuclear Information System (INIS)

    Carberry, M

    1996-01-01

    The paper is about the planning of nets in areas of low density like it is the case of the rural areas. The author includes economic and technological aspects, planning of nets, demands and management among others

  5. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... To receive Breastfeeding email updates Enter email Submit Planning ahead From choosing the crib to finding a ... care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  6. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding ...

  7. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  8. ANSTO strategic plan 1988-1993

    International Nuclear Information System (INIS)

    1988-12-01

    This Strategic Plan outlines the development of the Australian Nuclear Science and Technology Organisation in the five year period 1988/89-1992/93. Its formulation is a continuation of the corporate planning process, initiated after the promulgation of the ANSTO Act in April 1987, which culminated in the publication of the ANSTO Corporate Plan, 1987. The Plan constitutes the basis for the development of business plans for each sector of the Organisation

  9. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  10. 44 CFR 10.7 - Planning.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Planning. 10.7 Section 10.7... GENERAL ENVIRONMENTAL CONSIDERATIONS Agency Implementing Procedures § 10.7 Planning. (a) Early planning. The Regional Administrator shall integrate the NEPA process with other planning at the earliest...

  11. Retirement Planning the Easy Way.

    Science.gov (United States)

    Fields, Cheryl D.

    1996-01-01

    Options available to college faculty for planning their retirement benefits are described, including defined benefit plans, defined contribution plans, and methods for customizing a pension plan. Data for 1993 on American households owning interest-earning assets (passbook savings, money market deposit accounts, certificates of deposit, checking…

  12. Plan Merging : Experimental results

    NARCIS (Netherlands)

    De Weerdt, M.M.; Van der Krogt, R.P.J.; Zutt, J.

    2003-01-01

    In this paper we discuss the results of a plan merging algorithm. This algorithm coordinates the plans of multiple, autonomous agents, each able to independently find a plan. This algorithm is evaluated using realistic data from a taxi company. We show that when we allow passengers to be a few

  13. The transportation institutional plan: Cooperative planning for NWPA transportation

    International Nuclear Information System (INIS)

    Denny, S.H.; Livingston-Behan, E.A.

    1987-01-01

    The Transportation Institutional Plan, published in 1986 by the U.S. Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM), defines a process for effective interaction among those who may be affected by transportation activities conducted under provisions of the Nuclear Waste Policy Act of 1982 (NWPA). The Plan describes formal mechanisms for identifying, addressing, and resolving specific transportation issues. An appendix to the Plan includes detailed discussion of the following transportation issues: (1) the transportation of defense waste; (2) prenotification; (3) physical and rail shipments; (4) highway routing; (5) rail routing; (6) inspection and enforcement for highway and rail shipments; (7) emergency response; (8) liability coverage for transportation to NWPA facilities; (9) cask design and testing; (10) overweight truck shipments; (11) rail service analysis; (12) mixture of transportation modes; (13) transportation infrastructure improvements; (14) OCRWM training standards; (15) transportation operational procedures; and (16) State, Tribal, and local regulation of transportation. The OCRWM's intent is to provide an open accounting of planning, to identify opportunities for public involvement in program activities, and to foster communication and negotiation in the cooperative development of a safe, efficient, and cost-effective NWPA transportation program

  14. The Waypoint Planning Tool: Real Time Flight Planning for Airborne Science

    Science.gov (United States)

    He, M.; Goodman, H. M.; Blakeslee, R.; Hall, J. M.

    2010-12-01

    NASA Earth science research utilizes both spaceborne and airborne real time observations in the planning and operations of its field campaigns. The coordination of air and space components is critical to achieve the goals and objectives and ensure the success of an experiment. Spaceborne imagery provides regular and continual coverage of the Earth and it is a significant component in all NASA field experiments. Real time visible and infrared geostationary images from GOES satellites and multi-spectral data from the many elements of the NASA suite of instruments aboard the TRMM, Terra, Aqua, Aura, and other NASA satellites have become norm. Similarly, the NASA Airborne Science Program draws upon a rich pool of instrumented aircraft. The NASA McDonnell Douglas DC-8, Lockheed P3 Orion, DeHavilland Twin Otter, King Air B200, Gulfstream-III are all staples of a NASA’s well-stocked, versatile hangar. A key component in many field campaigns is coordinating the aircraft with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions. Given the variables involved, developing a good flight plan that meets the objectives of the field experiment can be a challenging and time consuming task. Planning a research aircraft mission within the context of meeting the science objectives is complex task because it is much more than flying from point A to B. Flight plans typically consist of flying a series of transects or involve dynamic path changes when “chasing” a hurricane or forest fire. These aircraft flight plans are typically designed by the mission scientists then verified and implemented by the navigator or pilot. Flight planning can be an arduous task requiring frequent sanity checks by the flight crew. This requires real time situational awareness of the weather conditions that affect the aircraft track. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool

  15. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  16. Oncentra brachytherapy planning system.

    Science.gov (United States)

    Yang, Jack

    2018-03-27

    In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of

  17. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  18. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  19. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  20. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. Copyright © 2012 Elsevier Inc. All rights reserved.

  1. Business Plans For Dummies

    CERN Document Server

    Tiffany, Paul; Barrow, Colin

    2011-01-01

    A full updated and extended second edition of an established UK bestseller Business Plans For Dummies 2nd Edition features new and updated information on formulating a solid business plan to build a secure business - even in an economic downturn. Complete with a brand new business plan template to get you started this expert guide offers fresh advice on reading the competitive marketplace and assessing your business in the current economic climate. It walks you step-by-step through every aspect of planning achievable business goals and diversification strategies, identifying trends, exploring

  2. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  3. Inverse planning IMRT

    International Nuclear Information System (INIS)

    Rosenwald, J.-C.

    2008-01-01

    The lecture addressed the following topics: Optimizing radiotherapy dose distribution; IMRT contributes to optimization of energy deposition; Inverse vs direct planning; Main steps of IMRT; Background of inverse planning; General principle of inverse planning; The 3 main components of IMRT inverse planning; The simplest cost function (deviation from prescribed dose); The driving variable : the beamlet intensity; Minimizing a 'cost function' (or 'objective function') - the walker (or skier) analogy; Application to IMRT optimization (the gradient method); The gradient method - discussion; The simulated annealing method; The optimization criteria - discussion; Hard and soft constraints; Dose volume constraints; Typical user interface for definition of optimization criteria; Biological constraints (Equivalent Uniform Dose); The result of the optimization process; Semi-automatic solutions for IMRT; Generalisation of the optimization problem; Driving and driven variables used in RT optimization; Towards multi-criteria optimization; and Conclusions for the optimization phase. (P.A.)

  4. The two faces of plan repair

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2004-01-01

    Plan repair has two faces. Alternately, a plan repair method looks like a planning method, or looks like a method that does exactly the opposite, i.e., removing actions from a plan. We propose a general framework for plan repair that shows the relation between these two alternating steps. Any plan

  5. Diagnosis of plan structure Violations

    NARCIS (Netherlands)

    Roos, Nico

    2007-01-01

    Failures in plan execution can be attributed to errors in the execution of plan steps or violations of the plan structure. The structure of a plan prescribes which actions have to be performed and which precedence constraints between them have to be respected. Especially in multi-agent environments

  6. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    Science.gov (United States)

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  7. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  8. Supply chain planning classification

    Science.gov (United States)

    Hvolby, Hans-Henrik; Trienekens, Jacques; Bonde, Hans

    2001-10-01

    Industry experience a need to shift in focus from internal production planning towards planning in the supply network. In this respect customer oriented thinking becomes almost a common good amongst companies in the supply network. An increase in the use of information technology is needed to enable companies to better tune their production planning with customers and suppliers. Information technology opportunities and supply chain planning systems facilitate companies to monitor and control their supplier network. In spite if these developments, most links in today's supply chains make individual plans, because the real demand information is not available throughout the chain. The current systems and processes of the supply chains are not designed to meet the requirements now placed upon them. For long term relationships with suppliers and customers, an integrated decision-making process is needed in order to obtain a satisfactory result for all parties. Especially when customized production and short lead-time is in focus. An effective value chain makes inventory available and visible among the value chain members, minimizes response time and optimizes total inventory value held throughout the chain. In this paper a supply chain planning classification grid is presented based current manufacturing classifications and supply chain planning initiatives.

  9. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  10. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  11. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Help Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ... Help Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ...

  12. ECP divisional training: plan 1996

    OpenAIRE

    Storr, Kenneth Mick

    1996-01-01

    The divisional training plan is produced each year at the request of the Joint Training Board (JTB) following a recommendation in the 1991 CERN Training Plan which states that divisions should produce a plan setting out training priorities. This plan presents a review of training activities. a report on ECP progress in implementing the recommendations of the 1995 CERN training plan, a discussion of divisional training objectives, and a summary of training requests generated by the 1996 period...

  13. The Effect of Person Centered Planning Activities on the IEP/Transition Planning Process.

    Science.gov (United States)

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    A study of 22 students with mental retardation and their families evaluated the impact of person-centered planning activities on several variables related to a student's individual education program/transition planning meeting. Person-centered planning had a significant effect on parent participation in meetings, but not on discussion of…

  14. Architecture for spacecraft operations planning

    Science.gov (United States)

    Davis, William S.

    1991-01-01

    A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

  15. Plan well, plan often

    Science.gov (United States)

    Bill Block

    2013-01-01

    This issue includes an invited paper by Courtney Schultz and her colleagues commenting on the application of the newly adopted U.S. Forest Service Planning Rule (hereafter, the rule) for wildlife. The rule is basically implementing language to interpret the spirit and intent of the National Forest Management Act (NFMA) of 1976. Laws such as NFMA require additional...

  16. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  17. Can Complexity be Planned?

    Directory of Open Access Journals (Sweden)

    Ilona Koutny

    2015-04-01

    Full Text Available The long accepted complexity invariance of human languages has become controversial within the last decade. In investigations of the problem, both creole and planned languages have often been neglected. After a presentation of the scope of the invariance problem and the proposition of the natural to planned language continuum, this article will discuss the contribution of planned languages. It will analyze the complexity of Esperanto at the phonological, morphological, syntactic and semantic levels, using linguistic data bases. The role of the L2 speech community and development of the language will also be taken into account when discussing the endurance of the same level of simplicity of this planned international language. The author argues that complexity can be variable and to some extent planned and maintained.

  18. Plan 2000. The electricity companies plan for electricity conservation in the millennium; Plan 2000. Elselskabernes plan for elbesparelser i det nye aartusinde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Plan 2000 presents an account of the activities in the years 1997 and 1998 and a budget for the year 2000 and forwards. The report includes all 82 electricity companies in Denmark. Furthermore a number of particular analyses of relevance to electricity conservation are presented. All electricity companies work to promote electricity conservation. All consumption sizes and sections are covered. The activities in the individual companies are supported by a number of common campaigns. In Plan 2000 those activities are presented and the economics is analysed. The activities in the first year of the plan are expected to result in conservation corresponding 4% of the present electricity consumption. 80% of the conservation comes from activities, which are measurable. Technical counselling of trade customers is one of the essential activities. Others are e.g. telephone counselling, theme arrangements and teaching of pupils. (EHS)

  19. Groundwater regulation and integrated planning

    Science.gov (United States)

    Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.

    2016-01-01

    The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.

  20. 3D treatment planning systems.

    Science.gov (United States)

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  1. PrEFiNe Plan: Strategic plan for Fabry's diseases in Nephrology

    Directory of Open Access Journals (Sweden)

    M.D. del Pino

    2016-07-01

    Discussion: PrEfiNE project will evaluate an action plan focused on improving FD knowledge to make necessary recommendations for an early recognition of the disease. In addition will generate a plan to improve previously undetected needs.

  2. Introduction to planning law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1986-01-01

    The author surveys the planning law in the Federal Republic of Germany. He deals with general regulations of the administrative procedure and land-use planning procedure and the main special rules of planning law, according to the Atomic Energy Act, the Nuclear Installation Ordinance and the Federal Act on the Protection against Nuisances. (WG) [de

  3. Ultimate disposal: a plan for achievement

    International Nuclear Information System (INIS)

    Bartlett, J.W.

    1975-01-01

    Four major topics relevant to R and D plans for disposal were: functions of planning, plans development procedures, R and D program procedures, and R and D plans content. Comments on these topics emphasize four major points: plans and their results support decisions on disposal methods; decisions will winnow options on the basis of comprehensive assessments; the R and D plan for disposal will be comprehensive and maintain options; time frame for the R and D program may be about 20 years. Prior and on-going work has provided a good foundation for this planning effort and the content of the plans. The R and D plans are expected to be developed this year and updated periodically

  4. The Effect of Online Planning, Strategic Planning and Rehearsal across Two Proficiency Levels

    Science.gov (United States)

    Baleghizadeh, Sasan; Shahri, Mohammad Naseh Nasrollahi

    2017-01-01

    The study presents an investigation of the effect of strategic planning, online planning and rehearsal on the fluency, accuracy and complexity of oral productions at two proficiency levels. Forty EFL participants at low and intermediate levels performed picture story tasks in three different conditions: the online planning only condition,…

  5. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  6. Retail Tactical Planning: An Aligned Process?

    OpenAIRE

    Dreyer , Heidi; Dukovska-Popovska , Iskra; Kiil , Kasper; Kaipia , Riikka

    2016-01-01

    Part 9: Quality in Production Management; International audience; This paper addresses tactical planning in retailing through a case study approach in one grocery retailing company. The issues are how tactical planning is conducted and how the different plans are connected. The study complements earlier retail planning studies by showing the sequence of planning phases and by studying the fragmented plans as a process. The master category planning is important and sets borders for the other p...

  7. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  8. Writing a group practice business plan.

    Science.gov (United States)

    Reiboldt, J M

    1999-07-01

    A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.

  9. Compilation of Japanese Basic Verb Usage Handbook for JFL Learners: A Project Report

    Directory of Open Access Journals (Sweden)

    Prashant PARDESHI

    2012-10-01

    Full Text Available In this article we introduce a collaborative research project entitled 'nihongogakushuushayou kihondoushi youhouhandbook no sakusei (Compilation of Japanese Basic Verb Usage Handbook for Japanese as Foreign Language (JFL Learners' carried out at the National Institute for Japanese Language and Linguistics (NINJAL and report on the progress of its research product, namely, a prototype of a basic verb usage handbook (referred to as 'handbook' below. The handbook differs in many ways from the conventional printed dictionaries or electronic dictionaries available at present. First, the handbook is compiled online and will be made available on internet for free access. Secondly, the handbook is corpus-based: the contents of the entry are written taking into consideration the actual use of the headword using the BCCWJ corpus. Also, it contains illustrative examples of a particular meaning culled from the BCCWJ corpus as well as those coined by the entry-writers. Third, the framework used in the description of semantic issues (polysemy network, cognitive mechanism underlying semantic extensions and semantic relationships among various meanings, etc. is cognitive grammar, which adopts prototype approach. Fourth, it includes audio-visual contents (such as audio files and animations/video clips etc. for effective understanding, acquisition and retention of various meanings of a polysemous verb. Fifth, the handbook is bi-lingual (Japanese-Chinese, Japanese-Korean and Japanese-Marathi and incorporates insights of contrastive studies and second language acquisition. The handbook is an attempt to share cutting edge research insights of various branches of linguistics with Japanese language pedagogy. It is hoped that the handbook will prove to be useful for JFL learners as well as Japanese language teachers across the globe. -----Članek predstavlja skupinski raziskovalni projekt z naslovom ‘Nihongogakushuushayou kihondoushi youhouhandbook no sakusei

  10. Automation of radiation treatment planning. Evaluation of head and neck cancer patient plans created by the Pinnacle{sup 3} scripting and Auto-Planning functions

    Energy Technology Data Exchange (ETDEWEB)

    Speer, Stefan; Weiss, Alexander; Bert, Christoph [Universitaetsklinikum Erlangen, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Department of Radiation Oncology, Erlangen (Germany); Klein, Andreas [EKS Engineering GmbH, Fuerth (Germany); Kober, Lukas [Strahlentherapie Tauber-Franken, Bad Mergentheim (Germany); Yohannes, Indra [Rinecker Proton Therapy Center, Munich (Germany)

    2017-08-15

    Intensity-modulated radiotherapy (IMRT) techniques are now standard practice. IMRT or volumetric-modulated arc therapy (VMAT) allow treatment of the tumor while simultaneously sparing organs at risk. Nevertheless, treatment plan quality still depends on the physicist's individual skills, experiences, and personal preferences. It would therefore be advantageous to automate the planning process. This possibility is offered by the Pinnacle{sup 3} treatment planning system (Philips Healthcare, Hamburg, Germany) via its scripting language or Auto-Planning (AP) module. AP module results were compared to in-house scripts and manually optimized treatment plans for standard head and neck cancer plans. Multiple treatment parameters were scored to judge plan quality (100 points = optimum plan). Patients were initially planned manually by different physicists and re-planned using scripts or AP. Script-based head and neck plans achieved a mean of 67.0 points and were, on average, superior to manually created (59.1 points) and AP plans (62.3 points). Moreover, they are characterized by reproducibility and lower standard deviation of treatment parameters. Even less experienced staff are able to create at least a good starting point for further optimization in a short time. However, for particular plans, experienced planners perform even better than scripts or AP. Experienced-user input is needed when setting up scripts or AP templates for the first time. Moreover, some minor drawbacks exist, such as the increase of monitor units (+35.5% for scripted plans). On average, automatically created plans are superior to manually created treatment plans. For particular plans, experienced physicists were able to perform better than scripts or AP; thus, the benefit is greatest when time is short or staff inexperienced. (orig.) [German] Intensitaetsmodulierte Strahlentherapie (IMRT) hat sich als Standard durchgesetzt. Mit IMRT oder volumenmodulierter Arc-Therapie (VMAT) lassen sich

  11. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  12. SU-G-TeP1-07: Investigation of RapidPlan Based Plan Quality for Breast IMRTSimultaneously Integrated Boost

    International Nuclear Information System (INIS)

    Wang, J; Hu, W; Chen, X; Wu, Z

    2016-01-01

    Purpose: The aim of this study is to investigate the feasibility of using RapidPlan for breast cancer radiotherapy and to evaluate its performance for planners with different planning experiences. Methods: A training database was collected with 80 expert plan datasets from patients previously received left breast conserving surgery and IMRT-simultaneously integrated boost radiotherapy. The models were created on the RapidPlan. Five patients from the training database and 5 external patients were used for internal and external validation, respectively. Three planners with different planning experiences (beginner, junior, senior) designed manual and RapidPlan based plans for additional ten patients. The plan qualities were compared with manual and RapidPlan based ones. Results: For the internal and external validations, there were no significant dose differences on target coverage for plans from RapidPlan and manual. Also, no difference was found in the mean doses to contralateral breast and lung. The RapidPlan improved the heart (V5, V10, V20, V30, and mead dose) and ipsilateral lung (V5, V10, V20, V30, and mean dose) sparing for the beginner and junior planners. Compare to the plans from senior planner, 6 out of 16 clinically checked parameters were improved in RapidPlan, and the left parameters were similar. Conclusion: It is feasible to generate clinical acceptable plans using RapidPlan for breast cancer radiotherapy. The RapidPlan helps to systematically improve the quality of IMRT plans against the benchmark of clinically accepted plans. The RapidPlan shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced planners.

  13. SU-G-TeP1-07: Investigation of RapidPlan Based Plan Quality for Breast IMRTSimultaneously Integrated Boost

    Energy Technology Data Exchange (ETDEWEB)

    Wang, J; Hu, W; Chen, X; Wu, Z [Fudan University Shanghai Cancer Center, Shanghai, Shanghai (China)

    2016-06-15

    Purpose: The aim of this study is to investigate the feasibility of using RapidPlan for breast cancer radiotherapy and to evaluate its performance for planners with different planning experiences. Methods: A training database was collected with 80 expert plan datasets from patients previously received left breast conserving surgery and IMRT-simultaneously integrated boost radiotherapy. The models were created on the RapidPlan. Five patients from the training database and 5 external patients were used for internal and external validation, respectively. Three planners with different planning experiences (beginner, junior, senior) designed manual and RapidPlan based plans for additional ten patients. The plan qualities were compared with manual and RapidPlan based ones. Results: For the internal and external validations, there were no significant dose differences on target coverage for plans from RapidPlan and manual. Also, no difference was found in the mean doses to contralateral breast and lung. The RapidPlan improved the heart (V5, V10, V20, V30, and mead dose) and ipsilateral lung (V5, V10, V20, V30, and mean dose) sparing for the beginner and junior planners. Compare to the plans from senior planner, 6 out of 16 clinically checked parameters were improved in RapidPlan, and the left parameters were similar. Conclusion: It is feasible to generate clinical acceptable plans using RapidPlan for breast cancer radiotherapy. The RapidPlan helps to systematically improve the quality of IMRT plans against the benchmark of clinically accepted plans. The RapidPlan shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced planners.

  14. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  15. Biological planning in radiation therapy

    International Nuclear Information System (INIS)

    Ganchev, D.; Nakova, N.

    2017-01-01

    The aim of the study is to introduce and apply the generalized Equivalent Uniform Dose (gEUD) radiobiological model for dosimetry planning and assessment of dose distribution against the radiobiological response of the tumor and healthy tissues and its comparison with the standard traditional method of planning and evaluation by dose-rate histograms, determination of the advantages and disadvantages of the predictive radiobiological models against standard methodologies. Methods used: Planning was done with VMAT Technique Planning System Eclipse v13.6 - Photon Optimizer (PO) v13.6 optimization algorithm and Analytical Anisotropy Algorithm (AAA) v13.6 for calculating the final dose distribution. In each case, three dosimetry plans were developed: plan 1 - standard dosing with DV criteria to be used as control, plan 2 - planning with dose gEUD criteria only, and plan 3 - combined planning with 2 types (DV and gEUD) criteria. The results obtained were evaluated by a dose-response histogram against QUANTEC, the recommendations on the toxicity for normal tissue and the relationships between toxicity and volume effects. Results: The planning by using the gEUD method, though significantly more effective in protecting the normal tissue, has led to 'cold' and 'hot' spots with clinically unacceptable values and compared to the standard DV method. The combined method demonstrated superiority both for the formation of a dose distribution with a large inhomogeneity and irregular geometric shape, and reduction the dose in critical organs and normal tissue, with acceptable homogeneity and conformation of distribution. Conclusion: Dosimetry planning using the gEUD model has a number of advantages, the main of which is to provide criteria that correspond to radiobiological effects, but its specificity requires a great deal of attention when using it. Although it offers improved organ preservation, additional research is needed on the relationship between

  16. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    International Nuclear Information System (INIS)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J; Keranen, W

    2015-01-01

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827

  17. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    Energy Technology Data Exchange (ETDEWEB)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J [University of Michigan Hospital and Health System, Ann Arbor, MI (United States); Keranen, W [Varian Medical Systems, Palo Alto, CA (United States)

    2015-06-15

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827.

  18. Elective course planning

    DEFF Research Database (Denmark)

    Kristiansen, Simon; Sørensen, Matias; Stidsen, Thomas Riis

    2011-01-01

    Efficient planning increasingly becomes an indispensable tool for management of both companies and public organizations. This is also the case for high school management in Denmark, because the growing individual freedom of the students to choose courses makes planning much more complex. Due...... to reforms, elective courses are today an important part of the curriculum, and elective courses are a good way to make high school education more attractive for the students. In this article, the problem of planning the elective courses is modeled using integer programming and three different solution...... for the Elective Course Planning Problem has been described in the literature before. The proposed algorithms are tested on data sets from 98 of the 150 high schools in Denmark. The tests show that for the majority of the problems, the optimal solution can be obtained within the one hour time bound. Furthermore...

  19. New Publications for Planning Libraries (List No. 18: Urban and Regional Planning). Exchange Bibliography 905.

    Science.gov (United States)

    Vance, Mary, Comp.

    This general bibliography contains current sources on urban and regional planning. Most citations date from 1973 through 1975, and some are annotated. The bulk of the documents are commercially published books, bulletins, project reports, and studies on urban studies, urban planning, regional planning, and city planning and problems. Citations are…

  20. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  1. Effective Hull IMMR plan

    Energy Technology Data Exchange (ETDEWEB)

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  2. Williamsport Area Community College Long Range Planning: The Long Range Plan, Update 1987.

    Science.gov (United States)

    Williamsport Area Community Coll., PA.

    This update to Williamsport Area Community College's (WACC's) 1984-89 long-range plan offers a status report on each of the plan's 78 objectives, reassigns responsibility for specific objectives to make the plan responsive to the current organizational structure of the college, and offers 11 new objectives for the 1986-87 academic year. After…

  3. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  4. Institutional plan. FY 1997-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  5. SU-F-J-105: Towards a Novel Treatment Planning Pipeline Delivering Pareto- Optimal Plans While Enabling Inter- and Intrafraction Plan Adaptation

    Energy Technology Data Exchange (ETDEWEB)

    Kontaxis, C; Bol, G; Lagendijk, J; Raaymakers, B [University Medical Center Utrecht, Utrecht (Netherlands); Breedveld, S; Sharfo, A; Heijmen, B [Erasmus University Medical Center Rotterdam, Rotterdam (Netherlands)

    2016-06-15

    Purpose: To develop a new IMRT treatment planning methodology suitable for the new generation of MR-linear accelerator machines. The pipeline is able to deliver Pareto-optimal plans and can be utilized for conventional treatments as well as for inter- and intrafraction plan adaptation based on real-time MR-data. Methods: A Pareto-optimal plan is generated using the automated multicriterial optimization approach Erasmus-iCycle. The resulting dose distribution is used as input to the second part of the pipeline, an iterative process which generates deliverable segments that target the latest anatomical state and gradually converges to the prescribed dose. This process continues until a certain percentage of the dose has been delivered. Under a conventional treatment, a Segment Weight Optimization (SWO) is then performed to ensure convergence to the prescribed dose. In the case of inter- and intrafraction adaptation, post-processing steps like SWO cannot be employed due to the changing anatomy. This is instead addressed by transferring the missing/excess dose to the input of the subsequent fraction. In this work, the resulting plans were delivered on a Delta4 phantom as a final Quality Assurance test. Results: A conventional static SWO IMRT plan was generated for two prostate cases. The sequencer faithfully reproduced the input dose for all volumes of interest. For the two cases the mean relative dose difference of the PTV between the ideal input and sequenced dose was 0.1% and −0.02% respectively. Both plans were delivered on a Delta4 phantom and passed the clinical Quality Assurance procedures by achieving 100% pass rate at a 3%/3mm gamma analysis. Conclusion: We have developed a new sequencing methodology capable of online plan adaptation. In this work, we extended the pipeline to support Pareto-optimal input and clinically validated that it can accurately achieve these ideal distributions, while its flexible design enables inter- and intrafraction plan

  6. SU-F-J-105: Towards a Novel Treatment Planning Pipeline Delivering Pareto- Optimal Plans While Enabling Inter- and Intrafraction Plan Adaptation

    International Nuclear Information System (INIS)

    Kontaxis, C; Bol, G; Lagendijk, J; Raaymakers, B; Breedveld, S; Sharfo, A; Heijmen, B

    2016-01-01

    Purpose: To develop a new IMRT treatment planning methodology suitable for the new generation of MR-linear accelerator machines. The pipeline is able to deliver Pareto-optimal plans and can be utilized for conventional treatments as well as for inter- and intrafraction plan adaptation based on real-time MR-data. Methods: A Pareto-optimal plan is generated using the automated multicriterial optimization approach Erasmus-iCycle. The resulting dose distribution is used as input to the second part of the pipeline, an iterative process which generates deliverable segments that target the latest anatomical state and gradually converges to the prescribed dose. This process continues until a certain percentage of the dose has been delivered. Under a conventional treatment, a Segment Weight Optimization (SWO) is then performed to ensure convergence to the prescribed dose. In the case of inter- and intrafraction adaptation, post-processing steps like SWO cannot be employed due to the changing anatomy. This is instead addressed by transferring the missing/excess dose to the input of the subsequent fraction. In this work, the resulting plans were delivered on a Delta4 phantom as a final Quality Assurance test. Results: A conventional static SWO IMRT plan was generated for two prostate cases. The sequencer faithfully reproduced the input dose for all volumes of interest. For the two cases the mean relative dose difference of the PTV between the ideal input and sequenced dose was 0.1% and −0.02% respectively. Both plans were delivered on a Delta4 phantom and passed the clinical Quality Assurance procedures by achieving 100% pass rate at a 3%/3mm gamma analysis. Conclusion: We have developed a new sequencing methodology capable of online plan adaptation. In this work, we extended the pipeline to support Pareto-optimal input and clinically validated that it can accurately achieve these ideal distributions, while its flexible design enables inter- and intrafraction plan

  7. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  8. 2008 Enterprise Transition Plan (ETP)

    National Research Council Canada - National Science Library

    England, Gordon

    2008-01-01

    The Enterprise Transition Plan (ETP) is the Department of Defense's integrated business transformation plan, which incorporates the transition plans of the Military Services, Components and the DoD Enterprise...

  9. Planning for study abroad.

    Science.gov (United States)

    Freeman, L H; Hermann, C P

    1994-01-01

    There is more to planning for study abroad than buying airplane tickets. Providing a successful course away from the host institution requires a great deal of planning by the educator. This planning includes course development, budget, marketing, travel, housing, food, and entertainment. Careful preparation provides both the educator and student a unique and enriching experience that goes beyond the traditional course.

  10. Planning for land use and conservation: Assessing GIS-based conservation software for land use planning

    Science.gov (United States)

    Rob Baldwin; Ryan Scherzinger; Don Lipscomb; Miranda Mockrin; Susan Stein

    2014-01-01

    Recent advances in planning and ecological software make it possible to conduct highly technical analyses to prioritize conservation investments and inform local land use planning. We review these tools, termed conservation planning tools, and assess the knowledge of a key set of potential users: the land use planning community. We grouped several conservation software...

  11. A system architecture for holonic manufacturing planning and control (EtoPlan)

    NARCIS (Netherlands)

    Wullink, Gerhard; Giebels, M.M.T.; Kals, H.J.J.

    2002-01-01

    In this paper, we present the system architecture of a flexible manufacturing planning and control system, named EtoPlan. The concept is based on the holonic control approach of building multiple and temporary hierarchies (holarchies). This paper describes the system architecture for flexible

  12. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    Science.gov (United States)

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  13. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  14. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  15. Technology Planning Strategies

    Science.gov (United States)

    Decker, Kathy

    2004-01-01

    Effective planning strategies drive achievement of an overall technology goal to increase access to electronic information in real time in order to increase efficiency, productivity, and communication across campus. Planning relies on providing access, 'Anytime Anywhere' to student information, calendar, email, course management tools, and the…

  16. Climate plan 2004

    International Nuclear Information System (INIS)

    2004-01-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO 2 each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  17. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  18. Access management in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  19. Route management in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  20. 75 FR 12496 - Endangered and Threatened Species; Recovery Plans; Recovery Plan for the Kemp's Ridley Sea Turtle

    Science.gov (United States)

    2010-03-16

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XS00 Endangered and Threatened Species; Recovery Plans; Recovery Plan for the Kemp's Ridley Sea Turtle AGENCIES... Plan (Plan) for the Kemp's Ridley Sea Turtle (Lepidochelys kempii). The Kemp's Ridley Recovery Plan is...

  1. Strategic planning for marketers.

    Science.gov (United States)

    Wilson, I

    1978-12-01

    The merits of strategic planning as a marketing tool are discussed in this article which takes the view that although marketers claim to be future-oriented, they focus too little attention on long-term planning and forecasting. Strategic planning, as defined by these authors, usually encompasses periods of between five and twenty-five years and places less emphasis on the past as an absolute predictor of the future. It takes a more probabilistic view of the future than conventional marketing strategy and looks at the corporation as but one component interacting with the total environment. Inputs are examined in terms of environmental, social, political, technological and economic importance. Because of its futuristic orientation, an important tenant of strategic planning is the preparation of several alternative scenarios ranging from most to least likely. By planning for a wide-range of future market conditions, a corporation is more able to be flexible by anticipating the course of future events, and is less likely to become a captive reactor--as the authors believe is now the case. An example of strategic planning at General Elecric is cited.

  2. Computerized radiation treatment planning

    International Nuclear Information System (INIS)

    Laarse, R. van der.

    1981-01-01

    Following a general introduction, a chain consisting of three computer programs which has been developed for treatment planning of external beam radiotherapy without manual intervention is described. New score functions used for determination of optimal incidence directions are presented and the calculation of the position of the isocentre for each optimum combination of incidence directions is explained. A description of how a set of applicators, covering fields with dimensions of 4 to 20 cm, for the 6 to 20 MeV electron beams of a MEL SL75-20 linear accelerator was developed, is given. A computer program for three dimensional electron beam treatment planning is presented. A microprocessor based treatment planning system for the Selectron remote controlled afterloading system for intracavitary radiotherapy is described. The main differences in treatment planning procedures for external beam therapy with neutrons instead of photons is discussed. A microprocessor based densitometer for plotting isodensity lines in film dosimetry is described. A computer program for dose planning of brachytherapy is presented. Finally a general discussion about the different aspects of computerized treatment planning as presented in this thesis is given. (Auth.)

  3. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  4. Soft Space Planning in Cities unbound

    DEFF Research Database (Denmark)

    Olesen, Kristian

    This paper analyses contemporary experiments of building governance capacity in new soft spaces in Denmark through processes of spatial strategy-making. The paper argues that new soft spaces are emerging in Danish spatial planning, which set out to promote more effective forms of strategic spatial...... planning, and how their obsession with promoting economic development at the expense of wider planning responsibilities support contemporary neoliberal transformations of strategic spatial planning....... planning. The Danish case of soft space planning demonstrates how Danish soft spaces at subnational scales fail to fill in the gaps between formal planning structures and provide the glue that binds formal scales of planning together as promised in the soft space literature. This raises a number...

  5. 24 CFR 91.415 - Strategic plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Strategic plan. 91.415 Section 91... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated Plan § 91.415 Strategic plan. Strategies and priority needs must be described in the consolidated plan...

  6. Accuracy of Three-Dimensional Planning in Surgery-First Orthognathic Surgery: Planning Versus Outcome

    Science.gov (United States)

    Tran, Ngoc Hieu; Tantidhnazet, Syrina; Raocharernporn, Somchart; Kiattavornchareon, Sirichai; Pairuchvej, Verasak; Wongsirichat, Natthamet

    2018-01-01

    Background The benefit of computer-assisted planning in orthognathic surgery (OGS) has been extensively documented over the last decade. This study aimed to evaluate the accuracy of three-dimensional (3D) virtual planning in surgery-first OGS. Methods Fifteen patients with skeletal class III malocclusion who underwent bimaxillary OGS with surgery-first approach were included. A composite skull model was reconstructed using data from cone-beam computed tomography and stereolithography from a scanned dental cast. Surgical procedures were simulated using Simplant O&O software, and the virtual plan was transferred to the operation room using 3D-printed splints. Differences of the 3D measurements between the virtual plan and postoperative results were evaluated, and the accuracy was reported using root mean square deviation (RMSD) and the Bland-Altman method. Results The virtual planning was successfully transferred to surgery. The overall mean linear difference was 0.88 mm (0.79 mm for the maxilla and 1 mm for the mandible), and the overall mean angular difference was 1.16°. The RMSD ranged from 0.86 to 1.46 mm and 1.27° to 1.45°, within the acceptable clinical criteria. Conclusion In this study, virtual surgical planning and 3D-printed surgical splints facilitated the diagnosis and treatment planning, and offered an accurate outcome in surgery-first OGS. PMID:29581806

  7. Accuracy of Three-Dimensional Planning in Surgery-First Orthognathic Surgery: Planning Versus Outcome.

    Science.gov (United States)

    Tran, Ngoc Hieu; Tantidhnazet, Syrina; Raocharernporn, Somchart; Kiattavornchareon, Sirichai; Pairuchvej, Verasak; Wongsirichat, Natthamet

    2018-05-01

    The benefit of computer-assisted planning in orthognathic surgery (OGS) has been extensively documented over the last decade. This study aimed to evaluate the accuracy of three-dimensional (3D) virtual planning in surgery-first OGS. Fifteen patients with skeletal class III malocclusion who underwent bimaxillary OGS with surgery-first approach were included. A composite skull model was reconstructed using data from cone-beam computed tomography and stereolithography from a scanned dental cast. Surgical procedures were simulated using Simplant O&O software, and the virtual plan was transferred to the operation room using 3D-printed splints. Differences of the 3D measurements between the virtual plan and postoperative results were evaluated, and the accuracy was reported using root mean square deviation (RMSD) and the Bland-Altman method. The virtual planning was successfully transferred to surgery. The overall mean linear difference was 0.88 mm (0.79 mm for the maxilla and 1 mm for the mandible), and the overall mean angular difference was 1.16°. The RMSD ranged from 0.86 to 1.46 mm and 1.27° to 1.45°, within the acceptable clinical criteria. In this study, virtual surgical planning and 3D-printed surgical splints facilitated the diagnosis and treatment planning, and offered an accurate outcome in surgery-first OGS.

  8. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  9. Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1978-01-01

    The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential performance of heat pumps, data required from cooling contractors, cooling locations, thermal outputs: cooling, recommended inputs for the 25 ton advanced cooling simulation study, meteorological data, and contract modification. (MHR)

  10. How many plans are needed in an IMRT multi-objective plan database?

    International Nuclear Information System (INIS)

    Craft, David; Bortfeld, Thomas

    2008-01-01

    In multi-objective radiotherapy planning, we are interested in Pareto surfaces of dimensions 2 up to about 10 (for head and neck cases, the number of structures to trade off can be this large). A key question that has not been answered yet is: how many plans does it take to sufficiently represent a high-dimensional Pareto surface? In this paper, we present a method to answer this question, and we show that the number of points needed is modest: 75 plans always controlled the error to within 5%, and in all cases but one, N + 1 plans, where N is the number of objectives, was enough for <15% error. We introduce objective correlation matrices and principal component analysis (PCA) of the beamlet solutions as two methods to understand this. PCA reveals that the feasible beamlet solutions of a Pareto database lie in a narrow, small dimensional subregion of the full beamlet space, which helps explain why the number of plans needed to characterize the database is small

  11. 30 CFR 282.23 - Testing Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies...

  12. 47 CFR 90.531 - Band plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Band plan. 90.531 Section 90.531...-805 MHz Bands § 90.531 Band plan. This section sets forth the band plan for the 763-775 MHz and 793... and portables subject to Commission-approved regional planning committee regional plans. Transmitter...

  13. Statistical Analysis Plan

    DEFF Research Database (Denmark)

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  14. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  15. Attitudes toward family planning.

    Science.gov (United States)

    Gille, H

    1984-06-01

    Many of the 135 countries participating in the 1974 UN World Population Conference were far from accepting the basic human right to decide freely and responsibly the number and spacing of their children and to have the information, education, and means to do so. Considerable progress has been made since then, and the number of developing countries that provide direct government support for family planning has increased to over 60%. Many have liberalized laws and regulations which restricted access to modern contraceptive methods, and a growing number provide family planning services within their health care programs. A few have recognized the practice of family planning as a constitutional right. In late 1983 at the Second African Population Conference, recognition of family as a human right was strongly contested by several governments, particularly those of West Africa. in developed countries most of the women at risk of unwanted pregnancy are using contraceptives. Of the major developing regions the highest use level is in Latin America, wherein most countries 1/3 to 1/2 of married women are users. Levels in Asian countries range from up to 10% in Afghanistan, Nepal, and Pakistan to up to 40% in the southeastern countries. China, a special case, now probably exceeds an overall use level of 2/3 of married women. Contraceptive use is lowest in Africa. There is room for improvement even among many of the successful family planning programs, as access to contraceptives usually is not sufficient to overcome limiting factors. To ensure the individual's free choice and strengthen the acceptability and practice of family planning, all available methods should be provided in service programs and inluded in information and education activities. Family planning programs should engage local community groups, including voluntary organizations, in all aspects of planning, management, and allocation of resources. At the government level a clear political commitment to family

  16. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  17. Institutional plan. Fiscal year, 1997--2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  18. Your cancer survivorship care plan

    Science.gov (United States)

    ... ency/patientinstructions/000822.htm Your cancer survivorship care plan To use the sharing features on this page, ... get one. What Is a Cancer Survivorship Care Plan? A cancer survivorship care plan is a document ...

  19. Decision support in hierarchical planning systems: The case of procurement planning in oil refining industries

    DEFF Research Database (Denmark)

    Kallestrup, Kasper Bislev; Lynge, Lasse Hadberg; Akkerman, Renzo

    2014-01-01

    In this paper, we discuss the development of decision support systems for hierarchically structured planning approaches, such as commercially available advanced planning systems. We develop a framework to show how such a decision support system can be designed with the existing organization in mind...... and from the perspective of the organizational aspects involved. To exemplify and develop our framework, we use a case study of crude oil procurement planning in the refining industry. The results of the case study indicate an improved organizational embedding of the DSS, leading to significant savings...... in terms of planning efforts and procurement costs. In general, our framework aims to support the continuous improvement of advanced planning systems, increasing planning quality in complex supply chain settings....

  20. Societal Planning: Identifying a New Role for the Transport Planner-Part II: Planning Guidelines

    DEFF Research Database (Denmark)

    Khisty, C. Jotin; Leleur, Steen

    1997-01-01

    The paper seeks to formulate planning guidelines based on Habermas's theory of communicative action. Specifically, this has led to the formulation of a set of four planning validity claims concerned to four types of planning guidelines concerning adequacy, dependency, suitability and adaptability......-a-vis the planning validity claims. Among other things the contingency of this process is outlined. It is concluded (part I & II) that transport planners can conveniently utilize the guidelines in their professional practice, tailored to their particular settings....

  1. 40 CFR 74.61 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  2. 7 CFR 25.202 - Strategic plan.

    Science.gov (United States)

    2010-01-01

    ... contributed to the planning process; (3) Identify the amount of State, local, and private resources that will... 7 Agriculture 1 2010-01-01 2010-01-01 false Strategic plan. 25.202 Section 25.202 Agriculture... Procedure § 25.202 Strategic plan. (a) Principles of strategic plan. The strategic plan included in the...

  3. Interactively exploring optimized treatment plans

    International Nuclear Information System (INIS)

    Rosen, Isaac; Liu, H. Helen; Childress, Nathan; Liao Zhongxing

    2005-01-01

    Purpose: A new paradigm for treatment planning is proposed that embodies the concept of interactively exploring the space of optimized plans. In this approach, treatment planning ignores the details of individual plans and instead presents the physician with clinical summaries of sets of solutions to well-defined clinical goals in which every solution has been optimized in advance by computer algorithms. Methods and materials: Before interactive planning, sets of optimized plans are created for a variety of treatment delivery options and critical structure dose-volume constraints. Then, the dose-volume parameters of the optimized plans are fit to linear functions. These linear functions are used to show in real time how the target dose-volume histogram (DVH) changes as the DVHs of the critical structures are changed interactively. A bitmap of the space of optimized plans is used to restrict the feasible solutions. The physician selects the critical structure dose-volume constraints that give the desired dose to the planning target volume (PTV) and then those constraints are used to create the corresponding optimized plan. Results: The method is demonstrated using prototype software, Treatment Plan Explorer (TPEx), and a clinical example of a patient with a tumor in the right lung. For this example, the delivery options included 4 open beams, 12 open beams, 4 wedged beams, and 12 wedged beams. Beam directions and relative weights were optimized for a range of critical structure dose-volume constraints for the lungs and esophagus. Cord dose was restricted to 45 Gy. Using the interactive interface, the physician explored how the tumor dose changed as critical structure dose-volume constraints were tightened or relaxed and selected the best compromise for each delivery option. The corresponding treatment plans were calculated and compared with the linear parameterization presented to the physician in TPEx. The linear fits were best for the maximum PTV dose and worst

  4. The Neoliberalisation of Strategic Spatial Planning

    DEFF Research Database (Denmark)

    Olesen, Kristian

    Despite the fact that strategic spatial planning practices recently have taken ‘a neoliberal turn’ in many European countries, ‘neoliberalism’ and ‘neoliberalisation’ are rarely used as analytical concepts in planning theory. This paper seeks to fill in part of this gap by examining...... the relationship between neoliberalism and strategic spatial planning. This is done through an analysis how the key theoretical ideas underpinning strategic spatial planning might be appropriated by neoliberal political agendas in planning practice. In conclusion, the paper argues that neoliberalism...... and neoliberalisation are helpful analytical concepts to examine and understand contemporary transformations of spatial planning discourses and practices, and that planning theory by adopting such analytical concepts can play an important role in assisting critical empirical studies of how spatial planning practices...

  5. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  6. A simple planning technique of craniospinal irradiation in the eclipse treatment planning system

    Directory of Open Access Journals (Sweden)

    Hemalatha Athiyaman

    2014-01-01

    Full Text Available A new planning method for Craniospinal Irradiation by Eclipse treatment planning system using Field alignment, Field-in-Field technique was developed. Advantage of this planning method was also studied retrospectively for previously treated five patients of medulloblastoma with variable spine length. Plan consists of half beam blocked parallel opposed cranium, and a single posterior cervicospine field was created by sharing the same isocenter, which obviates divergence matching. Further, a single symmetrical field was created to treat remaining Lumbosacral spine. Matching between a inferior diverging edge of cervicospine field and superior diverging edge of a Lumbosacral field was done using the field alignment option. ′Field alignment′ is specific option in the Eclipse Treatment Planning System, which automatically matches the field edge divergence as per field alignment rule. Multiple segments were applied in both the spine field to manage with hot and cold spots created by varying depth of spinal cord. Plan becomes fully computerized using this field alignment option and multiple segments. Plan evaluation and calculated mean modified Homogeneity Index (1.04 and 0.1 ensured that dose to target volume is homogeneous and critical organ doses were within tolerance. Dose variation at the spinal field junction was verified using ionization chamber array (I′MatriXX for matched, overlapped and gap junction spine fields; the delivered dose distribution confirmed the ideal clinical match, over exposure and under exposure at the junction, respectively. This method is simple to plan, executable in Record and Verify mode and can be adopted for various length of spinal cord with only two isocenter in shorter treatment time.

  7. Marketplace Plans With Narrow Physician Networks Feature Lower Monthly Premiums Than Plans With Larger Networks.

    Science.gov (United States)

    Polsky, Daniel; Cidav, Zuleyha; Swanson, Ashley

    2016-10-01

    The introduction of health insurance Marketplaces under the Affordable Care Act has been associated with growth of restricted provider networks. The value of this plan design strategy, including its association with lower premiums, is uncertain. We used data from all silver plans offered in the 2014 health insurance exchanges in the fifty states and the District of Columbia to estimate the association between the breadth of a provider network and plan premiums. We found that within a market, for plans of otherwise equivalent design and controlling for issuer-specific pricing strategy, a plan with an extra-small network had a monthly premium that was 6.7 percent less expensive than that of a plan with a large network. Because narrow networks remain an important strategy available to insurance companies to offer lower-cost plans on health insurance Marketplaces, the success of health insurance coverage expansions may be tied to the successful implementation of narrow networks. Project HOPE—The People-to-People Health Foundation, Inc.

  8. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  9. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  10. IMRT treatment planning-A comparative inter-system and inter-centre planning exercise of the ESTRO QUASIMODO group

    International Nuclear Information System (INIS)

    Bohsung, Joerg; Gillis, Sofie; Arrans, Rafael; Bakai, Annemarie; De Wagter, Carlos; Knoeoes, Tommy; Mijnheer, Ben J.; Paiusco, Marta; Perrin, Bruce A.; Welleweerd, Hans; Williams, Peter

    2005-01-01

    Background and purpose: The purpose of this work was a comparison of realistic IMRT plans based on the same CT-image data set and a common predefined set of dose objectives for the planning target volume and the organs at risk. This work was part of the larger European QUASIMODO IMRT verification project. Materials and methods: Eleven IMRT plans were produced by nine different European groups, each applying a representative set of clinically used IMRT treatment planning systems. The plans produced were to be deliverable in a clinically acceptable treatment time with the local technical equipment. All plans were characterized using a set of different quality measures such as dose-volume histograms, number of monitor units and treatment time. Results: Only one plan was able to fulfil all dose objectives strictly; six plans failed some of the objectives but were still considered to be clinically acceptable; four plans were not able to reach the objectives. Additional quality scores such as the number of monitor units and treatment time showed large variations, which mainly depend on the delivery technique. Conclusion: The presented planning study showed that with nearly all presently available IMRT planning and delivery systems comparable dose distributions could be achieved if the planning goals are clearly defined in advance

  11. Transportation planning for planned special events

    Science.gov (United States)

    2011-05-01

    Unique among planned special event activities are those events that carry the National Special Security Event (NSSE) designation. NSSEs occur with some frequency, with 35 of these events held between September 1998 and February 2010. These events inc...

  12. Standard review plan for the review and evaluation of emergency plans for research and test reactors

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides a Standard Review Plan to assure that complete and uniform reviews are made of research and test reactor radiological emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in American National Standard ANSI/ANS 15.16 - 1982 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady-state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix. The content of the emergency plan is as follows: the emergency plan addresses the necessary provisions for coping with radiological emergencies. Activation of the emergency plan is in response to the emergency action levels. In addition to addressing those severe emergencies that will fall within one of the standard emergency classes, the plan also discusses the necessary provisions to deal with radiological emergencies of lesser severity that can occur within the operations boundary. The emergency plan allows for emergency personnel to deviate from actions described in the plan for unusual or unanticipated conditions

  13. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  14. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  15. Tax planning in corporation

    OpenAIRE

    Nevodnicheva, Yulia

    2010-01-01

    This thesis "Tax planning in corporation" puts brain to legal entity income tax and it is looking for possible solutions in tax planning in corporation. The first part deals with the tax theory, the other part is the theory of tax planning, comparison of tax regimes and tax policy and tax revenue by optimizing both internationally and in the local aspect. The last part discusses options for optimizing tax

  16. Treatment planning for radiotherapy with very high-energy electron beams and comparison of VHEE and VMAT plans

    International Nuclear Information System (INIS)

    Bazalova-Carter, Magdalena; Qu, Bradley; Palma, Bianey; Jensen, Christopher; Maxim, Peter G.; Loo, Billy W.; Hårdemark, Björn; Hynning, Elin

    2015-01-01

    Purpose: The aim of this work was to develop a treatment planning workflow for rapid radiotherapy delivered with very high-energy electron (VHEE) scanning pencil beams of 60–120 MeV and to study VHEE plans as a function of VHEE treatment parameters. Additionally, VHEE plans were compared to clinical state-of-the-art volumetric modulated arc therapy (VMAT) photon plans for three cases. Methods: VHEE radiotherapy treatment planning was performed by linking EGSnrc Monte Carlo (MC) dose calculations with inverse treatment planning in a research version of RayStation. In order to study the effect of VHEE treatment parameters on VHEE dose distributions, a MATLAB graphical user interface (GUI) for calculation of VHEE MC pencil beam doses was developed. Through the GUI, pediatric case MC simulations were run for a number of beam energies (60, 80, 100, and 120 MeV), number of beams (13, 17, and 36), pencil beam spot (0.1, 1.0, and 3.0 mm) and grid (2.0, 2.5, and 3.5 mm) sizes, and source-to-axis distance, SAD (40 and 50 cm). VHEE plans for the pediatric case calculated with the different treatment parameters were optimized and compared. Furthermore, 100 MeV VHEE plans for the pediatric case, a lung, and a prostate case were calculated and compared to the clinically delivered VMAT plans. All plans were normalized such that the 100% isodose line covered 95% of the target volume. Results: VHEE beam energy had the largest effect on the quality of dose distributions of the pediatric case. For the same target dose, the mean doses to organs at risk (OARs) decreased by 5%–16% when planned with 100 MeV compared to 60 MeV, but there was no further improvement in the 120 MeV plan. VHEE plans calculated with 36 beams outperformed plans calculated with 13 and 17 beams, but to a more modest degree (<8%). While pencil beam spacing and SAD had a small effect on VHEE dose distributions, 0.1–3 mm pencil beam sizes resulted in identical dose distributions. For the 100 MeV VHEE pediatric

  17. The planning of decommissioning activities within nuclear facilities - Generating a Baseline Decommissioning Plan

    International Nuclear Information System (INIS)

    Meek, N.C.; Ingram, S.; Page, J.

    2003-01-01

    BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] → [Review project and conduct Characterisation review of power station] → [Identify work packages] → [Set up WBS to level 3] → [Assign work packages] → [Update WBS to level 4] →[Develop cost model] → [Develop logic network] → [Develop risk management procedure] ] → [Develop project strategy document]→ [Work package

  18. From justice in planning toward planning for justice: A capability approach

    NARCIS (Netherlands)

    Basta, Claudia

    2016-01-01

    This article discusses the relevance of Rawls’ Theory and Sen’s Idea of justice to contemporary planning theory by drawing on the writings of the two philosophers. Besides providing a comprehensive account of what the two respective frameworks imply for the foundation of public planning and for the

  19. Phase Transitions in Planning Problems: Design and Analysis of Parameterized Families of Hard Planning Problems

    Science.gov (United States)

    Hen, Itay; Rieffel, Eleanor G.; Do, Minh; Venturelli, Davide

    2014-01-01

    There are two common ways to evaluate algorithms: performance on benchmark problems derived from real applications and analysis of performance on parametrized families of problems. The two approaches complement each other, each having its advantages and disadvantages. The planning community has concentrated on the first approach, with few ways of generating parametrized families of hard problems known prior to this work. Our group's main interest is in comparing approaches to solving planning problems using a novel type of computational device - a quantum annealer - to existing state-of-the-art planning algorithms. Because only small-scale quantum annealers are available, we must compare on small problem sizes. Small problems are primarily useful for comparison only if they are instances of parametrized families of problems for which scaling analysis can be done. In this technical report, we discuss our approach to the generation of hard planning problems from classes of well-studied NP-complete problems that map naturally to planning problems or to aspects of planning problems that many practical planning problems share. These problem classes exhibit a phase transition between easy-to-solve and easy-to-show-unsolvable planning problems. The parametrized families of hard planning problems lie at the phase transition. The exponential scaling of hardness with problem size is apparent in these families even at very small problem sizes, thus enabling us to characterize even very small problems as hard. The families we developed will prove generally useful to the planning community in analyzing the performance of planning algorithms, providing a complementary approach to existing evaluation methods. We illustrate the hardness of these problems and their scaling with results on four state-of-the-art planners, observing significant differences between these planners on these problem families. Finally, we describe two general, and quite different, mappings of planning

  20. 77 FR 37349 - Amendment of Prohibited Payment Option Under Single-Employer Defined Benefit Plan of Plan Sponsor...

    Science.gov (United States)

    2012-06-21

    ... or after the date on which the enrolled actuary of the plan certifies that the adjusted funding... on which the enrolled actuary of the plan certifies that the plan's adjusted funding target... defined in Sec. 1.411(d)-3(g)(4)). First, the enrolled actuary of the plan has certified that the plan's...

  1. SU-F-T-617: Remotely Pre-Planned Stereotactic Ablative Radiation Therapy: Validation of Treatment Plan Quality

    International Nuclear Information System (INIS)

    Juang, T; Bush, K; Loo, B; Gensheimer, M

    2016-01-01

    Purpose: We propose a workflow to improve access to stereotactic ablative radiation therapy (SABR) for rural patients. When implemented, a separate trip to the central facility for simulation can be eliminated. Two elements are required: (1) Fabrication of custom immobilization devices to match positioning on prior diagnostic CT (dxCT). (2) Remote radiation pre-planning on dxCT, with transfer of contours/plan to simulation CT (simCT) and initiation of treatment same-day or next day. In this retrospective study, we validated part 2 of the workflow using patients already treated with SABR for upper lobe lung tumors. Methods: Target/normal structures were contoured on dxCT; a plan was created and approved by the physician. Structures were transferred to simCT using deformable image registration and the plan was re-optimized on simCT. Plan quality was evaluated through comparison to gold-standard structures contoured on simCT and a gold-standard plan based on these structures. Workflow-generated plan quality in this study represents a worst-case scenario as these patients were not treated using custom immobilization to match dxCT position as would be done when the workflow is implemented clinically. Results: 5/6 plans created through the pre-planning workflow were clinically acceptable. For all six plans, the gold-standard GTV received full prescription dose, along with median PTV V95%=95.2% and median PTV D95%=95.4%. Median GTV DSC=0.80, indicating high degree of similarity between the deformed and gold-standard GTV contours despite small GTV sizes (mean=3.0cc). One outlier (DSC=0.49) resulted in inadequate PTV coverage (V95%=62.9%) in the workflow plan; in clinical practice, this mismatch between deformed/gold-standard GTV would be revised by the physician after deformable registration. For all patients, normal tissue doses were comparable to the gold-standard plan and well within constraints. Conclusion: Pre-planning SABR cases on diagnostic imaging generated

  2. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Directory of Open Access Journals (Sweden)

    Budiman Kholiq

    2018-01-01

    Full Text Available This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system

  3. Comparison of RapidArc plans and fixed field intensity modulated radiotherapy planning in cervical cancer radiotherapy

    International Nuclear Information System (INIS)

    Liu Xiangyu; Liu Xianfeng; He Ya'nan; Yin Wenjuan; Wu Yongzhong

    2011-01-01

    Objective: To explore the advantages and disadvantages between the RapidArc plans and fixed-field IMRT plan (IMRT). Methods: Ten cases of cervical cancer,aged 55 (36-70), who were to receive post-operative radiotherapy were selected randomly. Single arc (Arc 1), two arcs (Arc 2), and three arc (Arc 3) RapidArc plans and fixed-field IMRT plan were designed respectively in the Eclipse 8.6 planning system. The designing, treatment time, target area, and dose distribution of organs at risk by these 4 planning techniques were compared. Results: The values of average planned treatment time by the Arc 1, Arc 2, and Arc 3 ten cases was 98, 155, 185, and 46 min, respectively. The values of average treatment time in the Varian IX accelerator were 2.15, 3.32, 4.48, and 6.95 min, respectively. The average mean doses were (48.99±1.08),(49.40±0.51), (49.51±0.62), and (48.65±0.92) Gy, respectively. The values of homogeneity index (HI) of target were 1.11±0.07, 1.07±0.02, 1.06±0.02, and 1.12±0.05, respectively. The values of conformal index (CI) of target were 0.73±0.13, 0.87±0.06, 0.87±0.06, and 0.79±0.06, respectively. The doses at rectum, bladder, and small intestine calculated by IMRT plan were the lowest, and the doses at the femoral neck calculated by these 4 plans were similar. Conclusions: The RapidArc plan is superior in dose distribution at target, HI, CI, and treatment time to IMRT, but IMRT plan is superior to RapidArc in planned dose calculation time and protection of organs at risk. However, in general, the RapidArc plan is better in clinical application than IMRT plan. (authors)

  4. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Science.gov (United States)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the

  5. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  6. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  7. FAA Flight Plan 2009-2013

    Science.gov (United States)

    2009-01-01

    The Flight Plan is the strategic plan for the agency, the plan to help us prepare for the future. The majority of FAAs responsibilities are our core functionsour everyday roles and responsibilitieswhich are not specifically highlighted in th...

  8. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  9. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  10. SU-F-T-358: Is Auto-Planning Useful for Volumetric-Modulated Arc Therapy Planning in Rectal Cancer Radiotherapy?

    International Nuclear Information System (INIS)

    Li, K; Chang, X; Wang, J; Hu, P; Hu, W

    2016-01-01

    Purpose: To evaluate whether Auto-Planning based volumetric-modulated radiotherapy (auto-VMAT) can reduce manual interaction time during treatment planning and improve plan quality for rectal cancer radiotherapy. Methods: Ten rectal cancer patients (stage II and III) after radical resection using Dixon surgery were enrolled. All patients were treated with VMAT technique. The manual VMAT plans (man-VMAT) were designed in the Pinnacle treatment planning system (Version 9.10) following the standard treatment planning procedure developed in our department. Clinical plans were manually designed by our experienced dosimetrists. Additionally, an auto-VMAT plan was created for each patient using Auto-Planning module. However, manual interaction was still applied to meet the clinical requirements. The treatment planning time and plan quality surrogated by the DVH parameters were compared between manual and automated plans. Results: The total planning time and manual interaction time were 50.38 and 4.47 min for the auto-VMAT and 36.81 and 16.94 min for the man-VMAT (t=60.14,−23.86; p=0.000, 0.000). In terms of plan quality, both plans meet the clinical requirements. The PTV homogeneity index (HI) and conformity index (CI) were 0.054 and 0.822 for the auto-VMAT and 0.059 and 0.815 for the man-VMAT (t=−1.72, 0.36;p=0.119,0.730).Compared to the man-VMAT, the auto-VMAT showed reduction of 11.9% and 0.7% in V40 and V50 of the bladder, respectively.The V30 and D mean were reduced by 14.0% and 5.1Gy in the left femur and 12.2% and 3.8Gy in the right femur. Conclusion: The Auto-Planning based VMAT plans not only shows similar or superior plan quality to the manual ones in the rectal cancer radiotherapy, but also improve the planning efficiency significantly. However, manual interactions are still required to achieve a clinically acceptable plan based on our experiences.

  11. SU-F-T-358: Is Auto-Planning Useful for Volumetric-Modulated Arc Therapy Planning in Rectal Cancer Radiotherapy?

    Energy Technology Data Exchange (ETDEWEB)

    Li, K; Chang, X; Wang, J; Hu, P; Hu, W [Fudan University Shanghai Cancer Center, Shanghai, Shanghai (China)

    2016-06-15

    Purpose: To evaluate whether Auto-Planning based volumetric-modulated radiotherapy (auto-VMAT) can reduce manual interaction time during treatment planning and improve plan quality for rectal cancer radiotherapy. Methods: Ten rectal cancer patients (stage II and III) after radical resection using Dixon surgery were enrolled. All patients were treated with VMAT technique. The manual VMAT plans (man-VMAT) were designed in the Pinnacle treatment planning system (Version 9.10) following the standard treatment planning procedure developed in our department. Clinical plans were manually designed by our experienced dosimetrists. Additionally, an auto-VMAT plan was created for each patient using Auto-Planning module. However, manual interaction was still applied to meet the clinical requirements. The treatment planning time and plan quality surrogated by the DVH parameters were compared between manual and automated plans. Results: The total planning time and manual interaction time were 50.38 and 4.47 min for the auto-VMAT and 36.81 and 16.94 min for the man-VMAT (t=60.14,−23.86; p=0.000, 0.000). In terms of plan quality, both plans meet the clinical requirements. The PTV homogeneity index (HI) and conformity index (CI) were 0.054 and 0.822 for the auto-VMAT and 0.059 and 0.815 for the man-VMAT (t=−1.72, 0.36;p=0.119,0.730).Compared to the man-VMAT, the auto-VMAT showed reduction of 11.9% and 0.7% in V40 and V50 of the bladder, respectively.The V30 and D mean were reduced by 14.0% and 5.1Gy in the left femur and 12.2% and 3.8Gy in the right femur. Conclusion: The Auto-Planning based VMAT plans not only shows similar or superior plan quality to the manual ones in the rectal cancer radiotherapy, but also improve the planning efficiency significantly. However, manual interactions are still required to achieve a clinically acceptable plan based on our experiences.

  12. EVENT PLANNING USING FUNCTION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase; Jodi Grgich

    2011-06-01

    Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

  13. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  14. Survey on the construction of realization scenario of large-scale revegetation of arid regions; Daikibo ryokuka no jitsugenka scenario sakusei ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In order to fix carbon dioxide as a measure to mitigate global warming, research of large-scale revegetation of arid regions has been conducted toward the ultimate goals of systematizing revegetation technologies centered on securing and using water resources, evaluating the feasibility of arid revegetation by extending the viewpoint to examine even rainfall increase by artificial means, and establishing a strategic program for large-scale revegetation. A trial revegetation feasibility map was made for a selected target region in Western Australia, and rough revegetation steps were formulated. Selection of proper region, introduction of technology, and planning were conducted by grasping environment of the target revegetation region. As a result, it was found that growth of plants is vigorous at the catchment areas due to the surface water transfer along the topography of surface in spite of poor rainfall. Obstruction of plant growth is partly caused by the corrosion of soil and accumulation of salt, but mainly caused by the shortage of water. Based on these data, ranking of proper regions was evaluated. When the technology is introduced in the region with A-rank, several times of water can be collected. 60 refs., 61 figs., 30 tabs.

  15. The alignment between spatial planning, transportation planning ...

    African Journals Online (AJOL)

    planning and environmental management strategically, functionally and operationally is ongoing .... between the built and the natural environment .... priorities as being experienced in. South Africa. 2. ... (intervention) proposals as contained.

  16. Reducing the sensitivity of IMPT treatment plans to setup errors and range uncertainties via probabilistic treatment planning

    International Nuclear Information System (INIS)

    Unkelbach, Jan; Bortfeld, Thomas; Martin, Benjamin C.; Soukup, Martin

    2009-01-01

    Treatment plans optimized for intensity modulated proton therapy (IMPT) may be very sensitive to setup errors and range uncertainties. If these errors are not accounted for during treatment planning, the dose distribution realized in the patient may by strongly degraded compared to the planned dose distribution. The authors implemented the probabilistic approach to incorporate uncertainties directly into the optimization of an intensity modulated treatment plan. Following this approach, the dose distribution depends on a set of random variables which parameterize the uncertainty, as does the objective function used to optimize the treatment plan. The authors optimize the expected value of the objective function. They investigate IMPT treatment planning regarding range uncertainties and setup errors. They demonstrate that incorporating these uncertainties into the optimization yields qualitatively different treatment plans compared to conventional plans which do not account for uncertainty. The sensitivity of an IMPT plan depends on the dose contributions of individual beam directions. Roughly speaking, steep dose gradients in beam direction make treatment plans sensitive to range errors. Steep lateral dose gradients make plans sensitive to setup errors. More robust treatment plans are obtained by redistributing dose among different beam directions. This can be achieved by the probabilistic approach. In contrast, the safety margin approach as widely applied in photon therapy fails in IMPT and is neither suitable for handling range variations nor setup errors.

  17. Path planning in changeable environments

    NARCIS (Netherlands)

    Nieuwenhuisen, D.

    2007-01-01

    This thesis addresses path planning in changeable environments. In contrast to traditional path planning that deals with static environments, in changeable environments objects are allowed to change their configurations over time. In many cases, path planning algorithms must facilitate quick

  18. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  19. 77 FR 66915 - Amendment of Prohibited Payment Option Under Single-Employer Defined Benefit Plan of Plan Sponsor...

    Science.gov (United States)

    2012-11-08

    ... limitation does not apply in a plan year on or after the date on which the enrolled actuary of the plan... after the date within the plan year on which the enrolled actuary of the plan certifies that the plan's... (the applicable amendment date, as defined in Sec. 1.411(d)-3(g)(4)). First, the enrolled actuary of...

  20. In the United States, a Mother's Plans for Infant Feeding Are Associated with Her Plans for Employment.

    Science.gov (United States)

    Mirkovic, Kelsey R; Perrine, Cria G; Scanlon, Kelley S; Grummer-Strawn, Laurence M

    2014-08-01

    The American Academy of Pediatrics recommends 6 months of exclusive breastfeeding, however, only 16% of US infants meet this recommendation. Shorter exclusive/predominant breastfeeding durations have been observed from women who return to work early and/or full-time. We assessed the relationship between prenatal plans for maternity leave duration and return to full-time/part-time status and plans for exclusive breastfeeding. This study included 2348 prenatally employed women from the Infant Feeding Practices Study II (2005-2007) who planned to return to work in the first year postpartum. Bivariate analysis and logistic regression were used to describe the association of maternity leave duration and return status with plans for infant feeding. Overall, 59.5% of mothers planned to exclusively breastfeed in the first few weeks. Mothers planning to return to work within 6 weeks had 0.60 times the odds (95% confidence interval [CI], 0.46-0.77) and mothers planning to return between 7 and 12 weeks had 0.72 times the odds (95% CI, 0.56-0.92) of planning to exclusively breastfeed compared with mothers who were planning to return after 12 weeks. Prenatal plans to return full-time (≥ 30 hours/week vs part-time) were also associated with lower odds of planning to exclusively breastfeed (adjusted odds ratio = 0.61; 95% CI, 0.51-0.77). Mothers planning to return to work before 12 weeks and/or full-time were less likely to plan to exclusively breastfeed. Longer maternity leave and/or part-time return schedules may increase the proportion of mothers who plan to exclusively breastfeed. © International Lactation Consultant Association 2014.

  1. Simultaneous optimization of sequential IMRT plans

    International Nuclear Information System (INIS)

    Popple, Richard A.; Prellop, Perri B.; Spencer, Sharon A.; Santos, Jennifer F. de los; Duan, Jun; Fiveash, John B.; Brezovich, Ivan A.

    2005-01-01

    Radiotherapy often comprises two phases, in which irradiation of a volume at risk for microscopic disease is followed by a sequential dose escalation to a smaller volume either at a higher risk for microscopic disease or containing only gross disease. This technique is difficult to implement with intensity modulated radiotherapy, as the tolerance doses of critical structures must be respected over the sum of the two plans. Techniques that include an integrated boost have been proposed to address this problem. However, clinical experience with such techniques is limited, and many clinicians are uncomfortable prescribing nonconventional fractionation schemes. To solve this problem, we developed an optimization technique that simultaneously generates sequential initial and boost IMRT plans. We have developed an optimization tool that uses a commercial treatment planning system (TPS) and a high level programming language for technical computing. The tool uses the TPS to calculate the dose deposition coefficients (DDCs) for optimization. The DDCs were imported into external software and the treatment ports duplicated to create the boost plan. The initial, boost, and tolerance doses were specified and used to construct cost functions. The initial and boost plans were optimized simultaneously using a gradient search technique. Following optimization, the fluence maps were exported to the TPS for dose calculation. Seven patients treated using sequential techniques were selected from our clinical database. The initial and boost plans used to treat these patients were developed independently of each other by dividing the tolerance doses proportionally between the initial and boost plans and then iteratively optimizing the plans until a summation that met the treatment goals was obtained. We used the simultaneous optimization technique to generate plans that met the original planning goals. The coverage of the initial and boost target volumes in the simultaneously optimized

  2. 2015 Plan. Project 1: methodology and planning process of the Brazilian electric sector expansion

    International Nuclear Information System (INIS)

    1993-10-01

    The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.)

  3. Planning of activities in the Laguna Verde Central planning at 12 weeks

    International Nuclear Information System (INIS)

    Chimalpopoca, C.

    2007-01-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  4. SU-F-T-447: The Impact of Treatment Planning Methods On RapidPlan Modeling for Rectum Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Lu, S; Peng, J; Li, K; Wang, J; Hu, W [Fudan University Shanghai Cancer Center, Shanghai, Shanghai (China)

    2016-06-15

    Purpose: To investigate the dose volume histogram (DVH) prediction varieties based on intensity modulate radiotherapy (IMRT) plan or volume arc modulate radiotherapy (VMAT) plan models on the RapidPlan. Methods: Two DVH prediction models were generated in this study, including an IMRT model trained from 83 IMRT rectum plans and a VMAT model trained from 60 VMAT rectum plans. In the internal validation, 20 plans from each training database were selected to verify the clinical feasibility of the model. Then, 10 IMRT plans (PIMRT-by-IMRT-model) generated from IMRT model and 10 IMRT plans generated from VMAT model (PIMRT-by-VMAT-model) were compared on the dose to organs at risk (OAR), which included bladder, left and right femoral heads. The similar comparison was also performed on the VMAT plans generated from IMRT model (PVMAT-by-IMRT-model) and VMAT plans generated from VMAT (PVMAT-by-VMAT-model) model. Results: For the internal validation, all plans from IMRT or VMAT model shows significantly improvement on OAR sparing compared with the corresponded clinical ones. Compared to the PIMRT-by-VMAT-model, the PIMRT-by-IMRT-model has a reduction of 6.90±3.87%(p<0.001) on V40 6.63±3.62%(p<0.001) on V45 and 4.74±2.26%(p<0.001) on V50 in bladder; and a mean dose reduction of 2.12±1.75Gy(p=0.004) and 2.84±1.53Gy(p<0.001) in right and left femoral head, respectively. There was no significant difference on OAR sparing between PVMAT-by-IMRT-model and PVMAT-by-VMAT-model. Conclusion: The IMRT model for the rectal cancer in the RapidPlan can be applied to for VMAT planning. However, the VMAT model is not suggested to use in the IMRT planning. Cautions should be taken that the planning model based on some technique may not feasible to other planning techniques.

  5. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  6. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  7. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  8. Fiscal 1974-1975 Sunshine Project research report. Hydrogen energy research results (National laboratories and institutes); 1974, 1975 nendo suiso energy kenkyu seika hokokushu. Kokuritsu shiken kenkyusho kankei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-10-01

    This report summarizes the 21 research results on hydrogen energy promoted by 3 national laboratories and 2 national institutes. (1) Tokyo National Industrial Research Institute (TNIRI): Ca-I system, Mn system, S system and hybrid cycles, and water decomposition reaction by CO as thermochemical hydrogen production technique. (2) Osaka National Industrial Research Institute (ONIRI): Fe system, Cu system and ammonia system cycles, and high-temperature high-pressure water electrolysis. (3) Electrotechnical Laboratory: high- temperature direct thermolysis hydrogen production technique. (4) TNIRI: Mg-base and transition metal-base hydrogen solidification technique. (5) ONIRI: Ti-base and rare metal- base hydrogen solidification technique. (6) Mechanical Engineering Laboratory: hydrogen-fuel engines. (7) Electrotechnical Laboratory and ONIRI: fuel cell. (8) TNIRI: disaster preventive technology for gaseous and liquid hydrogen. (9) Chugoku National Industrial Research Institute: preventing materials from embrittlement due to hydrogen. (10) Electrotechnical Laboratory: hydrogen energy system. (NEDO)

  9. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  10. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  11. SU-F-T-312: Identifying Distinct Radiation Therapy Plan Classes Through Multi-Dimensional Analysis of Plan Complexity Metrics

    Energy Technology Data Exchange (ETDEWEB)

    Desai, V; Labby, Z; Culberson, W [University of Wisc Madison, Madison, WI (United States)

    2016-06-15

    Purpose: To determine whether body site-specific treatment plans form unique “plan class” clusters in a multi-dimensional analysis of plan complexity metrics such that a single beam quality correction determined for a representative plan could be universally applied within the “plan class”, thereby increasing the dosimetric accuracy of a detector’s response within a subset of similarly modulated nonstandard deliveries. Methods: We collected 95 clinical volumetric modulated arc therapy (VMAT) plans from four body sites (brain, lung, prostate, and spine). The lung data was further subdivided into SBRT and non-SBRT data for a total of five plan classes. For each control point in each plan, a variety of aperture-based complexity metrics were calculated and stored as unique characteristics of each patient plan. A multiple comparison of means analysis was performed such that every plan class was compared to every other plan class for every complexity metric in order to determine which groups could be considered different from one another. Statistical significance was assessed after correcting for multiple hypothesis testing. Results: Six out of a possible 10 pairwise plan class comparisons were uniquely distinguished based on at least nine out of 14 of the proposed metrics (Brain/Lung, Brain/SBRT lung, Lung/Prostate, Lung/SBRT Lung, Lung/Spine, Prostate/SBRT Lung). Eight out of 14 of the complexity metrics could distinguish at least six out of the possible 10 pairwise plan class comparisons. Conclusion: Aperture-based complexity metrics could prove to be useful tools to quantitatively describe a distinct class of treatment plans. Certain plan-averaged complexity metrics could be considered unique characteristics of a particular plan. A new approach to generating plan-class specific reference (pcsr) fields could be established through a targeted preservation of select complexity metrics or a clustering algorithm that identifies plans exhibiting similar

  12. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    Energy Technology Data Exchange (ETDEWEB)

    Wu, C [Sutter Medical Foundation, Roseville, CA (United States)

    2016-06-15

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  13. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    International Nuclear Information System (INIS)

    Wu, C

    2016-01-01

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  14. 26 CFR 1.401(a)-12 - Mergers and consolidations of plans and transfers of plan assets.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Mergers and consolidations of plans and... Bonus Plans, Etc. § 1.401(a)-12 Mergers and consolidations of plans and transfers of plan assets. A... in the case of any merger or consolidation with, or transfer of assets or liabilities to, another...

  15. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  16. Professional analysis in spatial planning

    Directory of Open Access Journals (Sweden)

    Andrej Černe

    2005-12-01

    Full Text Available Spatial analysis contributes to accomplishment of the three basic aims of spatial planning: it is basic element for setting spatial policies, concepts and strategies, gives basic information to inhabitants, land owners, investors, planners and helps in performing spatial policies, strategies, plans, programmes and projects. Analysis in planning are generally devoted to: understand current circumstances and emerging conditions within planning decisions; determine priorities of open questions and their solutions; formulate general principles for further development.

  17. Planning for Self-Renewal: A New Approach to Planned Organizational Change.

    Science.gov (United States)

    Palola, Ernest G.; Padgett, William

    This monograph presents the findings of a study of planning and change at 80 colleges and universities, private and public, located in four separate states--California, Florida, Illinois and New York. In Chapter I, different substantive crises now facing higher education are presented and discussed. The next chapter (II), analyzes planning styles…

  18. Strategic planning in healthcare organizations.

    Science.gov (United States)

    Rodríguez Perera, Francisco de Paula; Peiró, Manel

    2012-08-01

    Strategic planning is a completely valid and useful tool for guiding all types of organizations, including healthcare organizations. The organizational level at which the strategic planning process is relevant depends on the unit's size, its complexity, and the differentiation of the service provided. A cardiology department, a hemodynamic unit, or an electrophysiology unit can be an appropriate level, as long as their plans align with other plans at higher levels. The leader of each unit is the person responsible for promoting the planning process, a core and essential part of his or her role. The process of strategic planning is programmable, systematic, rational, and holistic and integrates the short, medium, and long term, allowing the healthcare organization to focus on relevant and lasting transformations for the future. Copyright © 2012 Sociedad Española de Cardiología. Published by Elsevier Espana. All rights reserved.

  19. SU-D-BRD-01: Cloud-Based Radiation Treatment Planning: Performance Evaluation of Dose Calculation and Plan Optimization

    International Nuclear Information System (INIS)

    Na, Y; Kapp, D; Kim, Y; Xing, L; Suh, T

    2014-01-01

    Purpose: To report the first experience on the development of a cloud-based treatment planning system and investigate the performance improvement of dose calculation and treatment plan optimization of the cloud computing platform. Methods: A cloud computing-based radiation treatment planning system (cc-TPS) was developed for clinical treatment planning. Three de-identified clinical head and neck, lung, and prostate cases were used to evaluate the cloud computing platform. The de-identified clinical data were encrypted with 256-bit Advanced Encryption Standard (AES) algorithm. VMAT and IMRT plans were generated for the three de-identified clinical cases to determine the quality of the treatment plans and computational efficiency. All plans generated from the cc-TPS were compared to those obtained with the PC-based TPS (pc-TPS). The performance evaluation of the cc-TPS was quantified as the speedup factors for Monte Carlo (MC) dose calculations and large-scale plan optimizations, as well as the performance ratios (PRs) of the amount of performance improvement compared to the pc-TPS. Results: Speedup factors were improved up to 14.0-fold dependent on the clinical cases and plan types. The computation times for VMAT and IMRT plans with the cc-TPS were reduced by 91.1% and 89.4%, respectively, on average of the clinical cases compared to those with pc-TPS. The PRs were mostly better for VMAT plans (1.0 ≤ PRs ≤ 10.6 for the head and neck case, 1.2 ≤ PRs ≤ 13.3 for lung case, and 1.0 ≤ PRs ≤ 10.3 for prostate cancer cases) than for IMRT plans. The isodose curves of plans on both cc-TPS and pc-TPS were identical for each of the clinical cases. Conclusion: A cloud-based treatment planning has been setup and our results demonstrate the computation efficiency of treatment planning with the cc-TPS can be dramatically improved while maintaining the same plan quality to that obtained with the pc-TPS. This work was supported in part by the National Cancer Institute (1

  20. SU-D-BRD-01: Cloud-Based Radiation Treatment Planning: Performance Evaluation of Dose Calculation and Plan Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Na, Y; Kapp, D; Kim, Y; Xing, L [Stanford University School of Medicine, Stanford, CA (United States); Suh, T [Catholic UniversityMedical College, Seoul, Seoul (Korea, Republic of)

    2014-06-01

    Purpose: To report the first experience on the development of a cloud-based treatment planning system and investigate the performance improvement of dose calculation and treatment plan optimization of the cloud computing platform. Methods: A cloud computing-based radiation treatment planning system (cc-TPS) was developed for clinical treatment planning. Three de-identified clinical head and neck, lung, and prostate cases were used to evaluate the cloud computing platform. The de-identified clinical data were encrypted with 256-bit Advanced Encryption Standard (AES) algorithm. VMAT and IMRT plans were generated for the three de-identified clinical cases to determine the quality of the treatment plans and computational efficiency. All plans generated from the cc-TPS were compared to those obtained with the PC-based TPS (pc-TPS). The performance evaluation of the cc-TPS was quantified as the speedup factors for Monte Carlo (MC) dose calculations and large-scale plan optimizations, as well as the performance ratios (PRs) of the amount of performance improvement compared to the pc-TPS. Results: Speedup factors were improved up to 14.0-fold dependent on the clinical cases and plan types. The computation times for VMAT and IMRT plans with the cc-TPS were reduced by 91.1% and 89.4%, respectively, on average of the clinical cases compared to those with pc-TPS. The PRs were mostly better for VMAT plans (1.0 ≤ PRs ≤ 10.6 for the head and neck case, 1.2 ≤ PRs ≤ 13.3 for lung case, and 1.0 ≤ PRs ≤ 10.3 for prostate cancer cases) than for IMRT plans. The isodose curves of plans on both cc-TPS and pc-TPS were identical for each of the clinical cases. Conclusion: A cloud-based treatment planning has been setup and our results demonstrate the computation efficiency of treatment planning with the cc-TPS can be dramatically improved while maintaining the same plan quality to that obtained with the pc-TPS. This work was supported in part by the National Cancer Institute (1

  1. Program Planning in Health Professions Education

    Science.gov (United States)

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  2. [Municipal planning of care services between competition neutrality and demand planning. An example of care structure planning in Rhineland-Palatinate].

    Science.gov (United States)

    Klie, T; Pfundstein, T

    2010-04-01

    In times of demographic and social change, it is increasingly important to ensure the availability of care services to cover the growing demand. With the implementation of the German long-term insurance act in 1994, the responsibility of states and municipalities was maintained; however, given the long-term care legislation's market orientation and competition neutrality, the classic instruments for demand planning and supervision of infrastructure developments were lost. This leads to new challenges for states and municipalities: their conventional objective-oriented planning lacks professional and juridical legitimization. Calculations of requirements must relate to methodology and professional expertise. In order to exercise their influence on infrastructure development, instruments of demand planning other than subsidization are required. Using the example of Rheinland-Pfalz (Rhineland-Palatinate) and the newly implemented care structure planning, the concept of care monitoring is introduced, and instruments to influence infrastructure development are outlined.

  3. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  4. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  5. Learning Through Scenario Planning

    DEFF Research Database (Denmark)

    Balarezo, Jose

    level variables, this research corrects this void by investigating the dynamics of organizational learning through the lenses of a corporate scenario planning process. This enhances our scientific understanding of the role that scenario planning might play in the context of organizational learning......This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational...... and strategic renewal. Empirical evidence of the various difficulties that learning flows has to overcome as it journeys through organizational and hierarchical levels are presented. Despite various cognitive and social psychological barriers identified along the way, the results show the novel...

  6. Flight Planning

    Science.gov (United States)

    1991-01-01

    Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.

  7. China SLAT Plan Template

    Energy Technology Data Exchange (ETDEWEB)

    Dietrich, Richard E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  8. Adjustment of legally binding local plans

    DEFF Research Database (Denmark)

    Hvingel, Line Træholt; Aunsborg, Christian; Christensen, Finn Kjær

    2012-01-01

    Traditionally, and by law, new urban areas in Denmark are regulated and planned through legally binding local plans. Recently a tendency has occurred: The municipalities make the legally binding local plans quite open for future adjustment, and they are using a substantial amount of ‘empowerment ...... the considerations of legal rights, the extend of the legal use of empowerment provisions and the combination of the use of legal binding local plans and other legal instruments such as easements and sales agreements.......Traditionally, and by law, new urban areas in Denmark are regulated and planned through legally binding local plans. Recently a tendency has occurred: The municipalities make the legally binding local plans quite open for future adjustment, and they are using a substantial amount of ‘empowerment...... provisions’ which empower the municipalities to later ruling. This way of making plans postpones the actual regulation of an area (i.e. the planning permission) making it an individual ruling for instance at the application of building permits. Case studies show examples of this way of regulating an area...

  9. 76 FR 3648 - NIMS Training Plan

    Science.gov (United States)

    2011-01-20

    ...] NIMS Training Plan AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice of availability... comments on the NIMS Training Plan. This plan defines National Incident Management System (NIMS) national... sustaining NIMS training. In addition to delineating responsibilities and actions, the NIMS Training Plan...

  10. Evaluation of IMRT plans of prostate carcinoma from four treatment planning systems based on Monte Carlo

    International Nuclear Information System (INIS)

    Chi Zifeng; Han Chun; Liu Dan; Cao Yankun; Li Runxiao

    2011-01-01

    Objective: With the Monte Carlo method to recalculate the IMRT dose distributions from four TPS to provide a platform for independent comparison and evaluation of the plan quality.These results will help make a clinical decision as which TPS will be used for prostate IMRT planning. Methods: Eleven prostate cancer cases were planned with the Corvus, Xio, Pinnacle and Eclipse TPS. The plans were recalculated by Monte Carlo using leaf sequences and MUs for individual plans. Dose-volume-histograms and isodose distributions were compared. Other quantities such as D min (the minimum dose received by 99% of CTV/PTV), D max (the maximum dose received by 1% of CTV/PTV), V 110% , V 105% , V 95% (the volume of CTV/PTV receiving 110%, 105%, 95% of the prescription dose), the volume of rectum and bladder receiving >65 Gy and >40 Gy, and the volume of femur receiving >50 Gy were evaluated. Total segments and MUs were also compared. Results: The Monte Carlo results agreed with the dose distributions from the TPS to within 3%/3 mm. The Xio, Pinnacle and Eclipse plans show less target dose heterogeneity and lower V 65 and V 40 for the rectum and bladder compared to the Corvus plans. The PTV D min is about 2 Gy lower for Xio plans than others while the Corvus plans have slightly lower female head V 50 (0.03% and 0.58%) than others. The Corvus plans require significantly most segments (187.8) and MUs (1264.7) to deliver and the Pinnacle plans require fewest segments (82.4) and MUs (703.6). Conclusions: We have tested an independent Monte Carlo dose calculation system for dose reconstruction and plan evaluation. This system provides a platform for the fair comparison and evaluation of treatment plans to facilitate clinical decision making in selecting a TPS and beam delivery system for particular treatment sites. (authors)

  11. Special event planning for the emergency manager.

    Science.gov (United States)

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  12. A patient-specific planning target volume used in 'plan of the day' adaptation for interfractional motion mitigation

    International Nuclear Information System (INIS)

    Chen, Wenjing; Gemmel, Alexander; Rietzel, Eike

    2013-01-01

    We propose a patient-specific planning target volume (PTV) to deal with interfractional variations, and test its feasibility in a retrospective treatment-planning study. Instead of using one planning image only, multiple scans are taken on different days. The target and organs at risk (OARs) are delineated on each images. The proposed PTV is generated from a union of those target contours on the planning images, excluding voxels of the OARs, and is denoted the PTV 'GP-OAR' (global prostate-organs at risk). The study is performed using 'plan of the day' adaptive workflow, which selects a daily plan from a library of plans based on a similarity comparison between the daily scan and planning images. The daily plans optimized for GP-OAR volumes are compared with those optimized for PTVs generated from a single prostate contour (PTV SP). Four CT serials of prostate cancer patient datasets are included in the test, and in total 28 fractions are simulated. The results show that the daily chosen GP-OAR plans provide excellent target coverage, with V95 values of the prostate mostly >95%. In addition, dose delivered to the OARs as calculated from applying daily chosen GP-OAR plans is slightly increased but comparable to that calculated from applying daily SP plans. In general, the PTV GP-OARs are able to cover possible target variations while keeping dose delivered to the OARs at a similar level to that of the PTV SPs. (author)

  13. Public Information Plan

    International Nuclear Information System (INIS)

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project ''Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab

  14. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  15. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  16. PLANNING NATIONAL RADIOTHERAPY SERVICES

    Directory of Open Access Journals (Sweden)

    Eduardo eRosenblatt

    2014-11-01

    Full Text Available Countries, states and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centres are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment.This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centres, equipment, staff, education pr

  17. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  18. 26 CFR 1.414(l)-1 - Mergers and consolidations of plans or transfers of plan assets.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Mergers and consolidations of plans or transfers... Plans, Etc. § 1.414(l)-1 Mergers and consolidations of plans or transfers of plan assets. (a) In general... qualified under section 403 (a) and 405 (a), unless, in the case of a merger or consolidation (as defined in...

  19. Business plan writing for physicians.

    Science.gov (United States)

    Cohn, Kenneth H; Schwartz, Richard W

    2002-08-01

    Physicians are practicing in an era in which they are often expected to write business plans in order to acquire, develop, and implement new technology or programs. This task is yet another reminder of the importance of business principles in providing quality patient care amid allocation of increasingly scarce resources. Unfortunately, few physicians receive training during medical school, residencies, or fellowships in performing such tasks. The process of writing business plans follows an established format similar to writing a consultation, in which the risks, benefits, and alternatives to a treatment option are presented. Although administrative assistance may be available in compiling business plans, it is important for physicians to understand the rationale, process, and pitfalls of business planning. Writing a business plan will serve to focus, clarify, and justify a request for scarce resources, and thus, increase its chance of success, both in terms of funding and implementation. A well-written business plan offers a plausible, coherent story of an uncertain future. Therefore, a business plan is not merely an exercise to obtain funding but also a rationale for investment that can help physicians reestablish leadership in health care.

  20. Environmentalism and land use planning

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, P A.G.

    1986-01-01

    This dissertation considers the research question: Can land-use planning attain the goals of environmentalism. The research question instigates the development of models for environmentalism and land use planning, test of their congruence, analysis of institutional means to joint them, case study of the specific method of lifestyle zoning for Nature conservation, international comparisons, and suggestions for the implementation of the ideology of environmentalism by the techniques of land-use planning. Comparison among the industrially advanced anglophone countries of Australia, Canada, Great Britain and the United States of America enable cross-cultural insight into environmentalism, land-use planning, and measures for the protection of dedicated areas. The evaluation of the fit between environmentalism and land-use planning considers their origins, values, operating principles, programs and problems. The ideological outline of contemporary environmental planning provides a framework for detailed analysis of the case study of an Environmental Living Zone on the fringe of urban Melbourne, Australia. Historical research, interpretation of planning schemes, maps and aerial photographs, interviews, and observation provided insight into the social and environmental factors in residential conservation. From the empirical and theoretical analyses, the work suggests implications for practitioners and directions for further research.

  1. Constraint-based Attribute and Interval Planning

    Science.gov (United States)

    Jonsson, Ari; Frank, Jeremy

    2013-01-01

    In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

  2. IMRT plan verification in radiotherapy

    International Nuclear Information System (INIS)

    Vlk, P.

    2006-01-01

    This article describes the procedure for verification of IMRT (Intensity modulated radiation therapy) plan, which is used in the Oncological Institute of St. Elisabeth in Bratislava. It contains basic description of IMRT technology and developing a deployment plan for IMRT planning system CORVUS 6.0, the device Mimic (Multilammelar intensity modulated collimator) and the overall process of verifying the schedule created. The aim of verification is particularly good control of the functions of MIMIC and evaluate the overall reliability of IMRT planning. (author)

  3. 105-C Facility characterization plan

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    This facility characterization plan is a site-specific document that describes how quantification and qualification of the radiological sources and the radioactive contamination in the 105-C Building will be accomplished. Characterization of hazardous materials will be addressed in a separate plan. This plan was developed from review of video tapes, photographs, and records. The purpose of this characterization plan is to provide an efficient and cost-effective method for determining the distribution of radioactive contamination at the 105-C Facility

  4. Applying radiological emergency planning experience to hazardous materials emergency planning within the nuclear industry

    International Nuclear Information System (INIS)

    Foltman, A.; Newsom, D.; Lerner, K.

    1988-01-01

    The nuclear industry has extensive radiological emergency planning (REP) experience that is directly applicable to hazardous materials emergency planning. Recently, the Feed Materials Production Center near Cincinnati, Ohio, successfully demonstrated such application. The REP experience includes conceptual bases and standards for developing plans that have been tested in hundreds of full-scale exercises. The exercise program itself is also well developed. Systematic consideration of the differences between chemical and radiological hazards shows that relatively minor changes to the REP bases and standards are necessary. Conduct of full-scale, REP-type exercises serves to test the plans, provide training, and engender confidence and credibility

  5. SCENARIO PLANNING AS LEARNING

    Directory of Open Access Journals (Sweden)

    Antonio Lourenço Junior

    2010-10-01

    Full Text Available Scenario Planning has been increasingly used, from its introduction to the decision process as effective tools to test decisions, and improve performance in a dynamic environment (Chermack, 2005. The purpose of this article is to demonstrate the potential of an experimental Scenario Planning Model to mobilize, encourage and add more content to the organization’s decision making process – mainly with respect to Strategic Plans of two governmental institutions, a pharmaceutical company and a technology education foundation.  This study describes the application stages of a hybrid scenario-planning model – herein referred to as Planning as Learning – via action-research, showing the scenarios resulting from the experiment and describes the main results of an assessment of such practice. In order to do that, two well-established Scenario Planning models (Prospective school and Shell’s model were analyzed. They were used as a reference for the proposition and application of an experimental model in the two study objects. A questionnaire was used to assess the technique impact. It was possible to obtain high levels of reliability. In-depth interviews were also conducted with the participants. At the end, the results confirmed the model efficiency as a basis for decision making in the competitive environment in which the two institutions are inserted, also to encourage the learning process as a group, as observed throughout the work.

  6. Site 300 SPCC Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-11-23

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  7. Lesson Planning the Kodaly Way.

    Science.gov (United States)

    Boshkoff, Ruth

    1991-01-01

    Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)

  8. Strategic Planning for Higher Education.

    Science.gov (United States)

    Kotler, Philip; Murphy, Patrick E.

    1981-01-01

    The framework necessary for achieving a strategic planning posture in higher education is outlined. The most important benefit of strategic planning for higher education decision makers is that it forces them to undertake a more market-oriented and systematic approach to long- range planning. (Author/MLW)

  9. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  10. With Worldmaking, Planning Models Matter.

    Science.gov (United States)

    Cain, Beatrice Naff

    1989-01-01

    Examines two different planning models (creative and rational means-end) used in a teacher preparation program to determine what influence the different planning models had on preservice English teachers' thinking before, during, and after teaching. Finds the creative planning model more effectively encourages active worldmaking. (MS)

  11. 23 CFR 652.11 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 652.11 Section 652.11 Highways FEDERAL HIGHWAY... ACCOMMODATIONS AND PROJECTS § 652.11 Planning. Federally aided bicycle and pedestrian projects implemented within... unless excluded by agreement between the State and the metropolitan planning organization. ...

  12. The neoliberalisation of strategic spatial planning

    DEFF Research Database (Denmark)

    Olesen, Kristian

    2014-01-01

    scales, and partly through the normalisation of neoliberal discourses in strategic spatial planning processes. This paper analyses the complex relationship, partly of unease and partly of coevolution, between neoliberalism and strategic spatial planning. Furthermore, the paper discusses the key......Strategic spatial planning practices have recently taken a neoliberal turn in many northwestern European countries. This neoliberalisation of strategic spatial planning has materialised partly in governance reforms aiming to reduce or abolish strategic spatial planning at national and regional...... challenges for strategic spatial planning in the face of neoliberalism and argues for a need to strengthen strategic spatial planning’s critical dimension....

  13. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  14. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  15. Emergency planning for industrial hazards

    International Nuclear Information System (INIS)

    Gow, H.B.F.; Kay, R.W.

    1988-01-01

    The European Communities have produced a Directive on the Major Accident Hazards of Certain Industrial Activities which sets out standards for the control and mitigation of the hazards presented by sites and storages which contain significant quantities of dangerous substances. An essential element of these controls is the provision of effective on-and off-site emergency plans. This conference explores the considerable research effort which is going on throughout the world in the improvement of systems for emergency planning. Attention was also drawn to areas where difficulties still exist, for example in predicting the consequences of an accident, the complexities of communication problems and the difficulties arising from involvement of the public. The proceedings are in six parts which deal with organizations implementing emergency planning: on- and off-site emergency planning and design; techniques for emergency plans; expenses and auditing of emergency plans; lessons learnt from the emergency management of major accidents; information to the public to and during emergencies. (author)

  16. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo; Xiaolong; Xu; Xiao; Li; Min

    2016-01-01

    Rural development has long been the focus of China’s central and local governments. Since the late 2000 s, rural areas have presented new transformation features and development trends. To stimulate rural transformation and development in the 13 th Five-Year Plan period, this paper reviews major ideas on rural development in related disciplines. This study also summarizes main rural transformation features, including the aging population, hollow villages, changes in the allocation of land resource, semi-urbanization, and regional differences in rural development. Finally, it also provides suggestions for planning tactics in the 13 th Five-Year Plan period, such as making differentiated rural development strategies, exploring new methods to stimulate rural stock land planning and use, and enforcing relevant policy and management reforms.

  17. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo Xiaolong; Xu Xiao; Li Min

    2016-01-01

    Rural development has long been the focus of China's central and local governments.Since the late 2000s,rural areas have presented new transformation features and development trends.To stimulate rural transformation and development in the 13th Five-Year Plan period,this paPer reviews major ideas on rural development in related disciplines.This study also summarizes main rural transformation features,including the aging population,hollow villages,changes in the allocation of land resource,semi-urbanization,and regional differences in rural development.Finally,it also provides suggestions for planning tactics in the 13th Five-Year Plan period,such as making differentiated rural development strategies,exploring new methods to stimulate rural stock land planning and use,and enforcing relevant policy and management reforms.

  18. Can a More User-Friendly Medicare Plan Finder Improve Consumers' Selection of Medicare Plans?

    Science.gov (United States)

    Martino, Steven C; Kanouse, David E; Miranda, David J; Elliott, Marc N

    2017-10-01

    To evaluate the efficacy for consumers of two potential enhancements to the Medicare Plan Finder (MPF)-a simplified data display and a "quick links" home page designed to match the specific tasks that users seek to accomplish on the MPF. Participants (N = 641) were seniors and adult caregivers of seniors who were recruited from a national online panel. Participants browsed a simulated version of the MPF, made a hypothetical plan choice, and reported on their experience. Participants were randomly assigned to one of eight conditions in a fully factorial design: 2 home pages (quick links, current MPF home page) × 2 data displays (simplified, current MPF display) × 2 plan types (stand-alone prescription drug plan [PDP], Medicare Advantage plan with prescription drug coverage [MA-PD]). The quick links page resulted in more favorable perceptions of the MPF, improved users' understanding of the information, and increased the probability of choosing the objectively best plan. The simplified data display resulted in a more favorable evaluation of the website, better comprehension of the displayed information, and, among those choosing a PDP only, an increased probability of choosing the best plan. Design enhancements could markedly improve average website users' understanding, ability to use, and experience of using the MPF. © Health Research and Educational Trust.

  19. Using gEUD based plan analysis method to evaluate proton vs. photon plans for lung cancer radiation therapy.

    Science.gov (United States)

    Xiao, Zhiyan; Zou, Wei J; Chen, Ting; Yue, Ning J; Jabbour, Salma K; Parikh, Rahul; Zhang, Miao

    2018-03-01

    The goal of this study was to exam the efficacy of current DVH based clinical guidelines draw from photon experience for lung cancer radiation therapy on proton therapy. Comparison proton plans and IMRT plans were generated for 10 lung patients treated in our proton facility. A gEUD based plan evaluation method was developed for plan evaluation. This evaluation method used normal lung gEUD(a) curve in which the model parameter "a" was sampled from the literature reported value. For all patients, the proton plans delivered lower normal lung V 5 Gy with similar V 20 Gy and similar target coverage. Based on current clinical guidelines, proton plans were ranked superior to IMRT plans for all 10 patients. However, the proton and IMRT normal lung gEUD(a) curves crossed for 8 patients within the tested range of "a", which means there was a possibility that proton plan would be worse than IMRT plan for lung sparing. A concept of deficiency index (DI) was introduced to quantify the probability of proton plans doing worse than IMRT plans. By applying threshold on DI, four patients' proton plan was ranked inferior to the IMRT plan. Meanwhile if a threshold to the location of curve crossing was applied, 6 patients' proton plan was ranked inferior to the IMRT plan. The contradictory ranking results between the current clinical guidelines and the gEUD(a) curve analysis demonstrated there is potential pitfalls by applying photon experience directly to the proton world. A comprehensive plan evaluation based on radio-biological models should be carried out to decide if a lung patient would really be benefit from proton therapy. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  20. 75 FR 25840 - Endangered and Threatened Species; Recovery Plans; Recovery Plan for the Kemp's Ridley Sea Turtle

    Science.gov (United States)

    2010-05-10

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XS00 Endangered and Threatened Species; Recovery Plans; Recovery Plan for the Kemp's Ridley Sea Turtle AGENCIES...-National Recovery Plan (Plan) for the Kemp's Ridley Sea Turtle (Lepidochelys kempii). The Kemp's Ridley...