WorldWideScience

Sample records for plan preparation guide

  1. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  2. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  3. Influenza pandemic planning guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  4. Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

  5. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  6. EPRI's pumped storage planning and evaluation guide

    International Nuclear Information System (INIS)

    Chen, H.H.

    1991-01-01

    EPRI's Hydropower Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: evaluate pumped-storage operation in a utility system, establish site development concept, estimate capital cost, and conduct economic analysis. The Guide provides a floppy diskette containing a production costing model simulating the chronologic operation of pumped storage in a generating system. It provides a series of estimating curves for the preparation of capital cost estimates. The paper presents how the Guide was organized and prepared, and highlights its contents

  7. Guided endodontics: accuracy of a novel method for guided access cavity preparation and root canal location.

    Science.gov (United States)

    Zehnder, M S; Connert, T; Weiger, R; Krastl, G; Kühl, S

    2016-10-01

    To present a novel method utilizing 3D printed templates to gain guided access to root canals and to evaluate its accuracy in vitro. Sixty extracted human teeth were placed into six maxillary jaw models. Preoperative CBCT scans were matched with intra-oral scans using the coDiagnostix(™) software. Access cavities, sleeves and templates for guidance were virtually planned. Templates were produced by a 3D printer. After access cavity preparation by two operators, a postoperative CBCT scan was superimposed on the virtual planning. Accuracy was measured by calculating the deviation of planned and prepared cavities in three dimensions and angle. Ninety-five per cent confidence intervals were calculated for both operators. All root canals were accessible after cavity preparation with 'Guided Endodontics'. Deviations of planned and prepared access cavities were low with means ranging from 0.16 to 0.21 mm for different aspects at the base of the bur and 0.17-0.47 mm at the tip of the bur. Mean of angle deviation was 1.81°. Overlapping 95% confidence intervals revealed no significant difference between operators. 'Guided Endodontics' allowed an accurate access cavity preparation up to the apical third of the root utilizing printed templates for guidance. All root canals were accessible after preparation. © 2015 International Endodontic Journal. Published by John Wiley & Sons Ltd.

  8. A Planning Guide for Instructional Networks, Part I.

    Science.gov (United States)

    Daly, Kevin F.

    1994-01-01

    Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)

  9. Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

  10. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  11. Resolution no. 18/2012 Guide for the preparation and emergency response radiological

    International Nuclear Information System (INIS)

    2012-01-01

    This guide aims to establish requirements to ensure an adequate level of entities, for the preparation and response to radiological emergencies and to prepare the Radiation Emergency Plan (PER), asset out in the Basic Safety Standards radiological and authorizations Regulations in force. This guide applies to organizations providing employment practices associated with sources of ionizing radiation, hereinafter sources.

  12. The public transportation system security and emergency preparedness planning guide

    Science.gov (United States)

    2003-01-01

    Recent events have focused renewed attention on the vulnerability of the nation's critical infrastructure to major events, including terrorism. The Public Transportation System Security and Emergency Preparedness Planning Guide has been prepared to s...

  13. Computer guided pre-operative planning and dental implant placement

    Directory of Open Access Journals (Sweden)

    Dušan Grošelj

    2007-05-01

    Full Text Available Background: Implants in dentistry are, besides fixed, removable and maxillofacial prosthodontics, one of the reliable possibility to make functional and aesthetic rehabilitation of the edentulism. Surgical and prosthodontic implant complications are often an inattentive consequence of wrong diagnosis, planning, and placement. In this article we present a technique using a highly advanced software program along with a rapid prototyping technology named stereolithography. A planning software for implant placement needs basically the high quality computed tomographic scan of one or both jaws for making accurate preoperative diagnostics and 3D preoperative plan. Later individual drill guide is designed and generated based on both the CT images and the preoperative planning. The patient specific drill guide transfers the virtual planning to the patient’s mouth at time of surgery.Conclusions: The advantages of computer guided implantology are the better prepared surgery with visualisation of critical anatomic structures, assessment of available bone and data about bone quality, increased confidence for the surgeon, deceased operative time, less frequent use of bone grafts, higher quality of collaboration between specialists and prosthetic lab and better communication with patients. Radiographic examination of the operation field for computer guided planning for implant placement is due to high costs justified as the most important information source on the areas to be implanted.

  14. A guide for preparing Hanford Site facility effluent monitoring plans

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1992-06-01

    This document provides guidance on the format and content of effluent monitoring plans for facilities at the Hanford Site. The guidance provided in this document is designed to ensure compliance with US Department of Energy (DOE) Orders 5400.1 (DOE 1988a), 5400.3 (DOE 1989a), 5400.4 (DOE 1989b), 5400.5 (DOE 1990a), 5480.1 (DOE 1982), 5480.11 (DOE 1988b), and 5484.1 (DOE 1981). These require environmental monitoring plans for each site, facility, or process that uses, generates, releases, or manages significant pollutants of radioactive or hazardous materials. In support of DOE Orders 5400.5 (Radiation Protection of the Public and the Environment) and 5400.1 (General Environmental Protection Program), the DOE Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE 1991) should be used to establish elements of a radiological effluent monitoring program in the Facility Effluent Monitoring Plan. Evaluation of facilities for compliance with the US Environmental Protection Agency Clean Air Act of 1977 requirements also is included in the airborne emissions section of the Facility Effluent Monitoring Plans. Sampling Analysis Plans for Liquid Effluents, as required by the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), also are included in the Facility Effluent Monitoring Plans. The Facility Effluent Monitoring Plans shall include complete documentation of gaseous and liquid effluent sampling and monitoring systems

  15. Guide to Preparing SAND Reports and other communication products : quick reference guide.

    Energy Technology Data Exchange (ETDEWEB)

    2009-10-01

    This Quick Reference Guide supplements the more complete Guide to Preparing SAND Reports and Other Communication Products. It provides limited guidance on how to prepare SAND Reports at Sandia National Laboratories. Users are directed to the in-depth guide for explanations of processes.

  16. Energy emergency planning guide: Winter 1977-78

    Energy Technology Data Exchange (ETDEWEB)

    1977-11-01

    This Energy Emergency Planning Guide for Winter, 1977-78 has been prepared in order to: identify and evaluate actions available to deal with energy emergencies this winter; provide an advance indication to the public of those actions considered most likely to be taken by the government, and provide industry, state, and local governments with suggestions about actions which they can take to deal with energy emergencies. The Guide contains specifications for over 50 standby programs and procedures, recommended implementation guidelines for using these programs keyed to a pre-emergency phase and three phases of shortfalls, and a design for an Energy Emergency Center. Flexible implementation guidelines are proposed for natural gas, petroleum, electricity/coal, and propane shortages. (MCW)

  17. Guide to preparing SAND reports and other communication products : quick reference guide.

    Energy Technology Data Exchange (ETDEWEB)

    2007-03-01

    This 'Quick Reference Guide' supplements the more complete 'Guide to Preparing SAND Reports and Other Communication Products'. It provides limited guidance on how to prepare SAND Reports at Sandia National Laboratories. Users are directed to the in-depth guide for explanations of processes.

  18. Guide for prepare the plan for radiological emergency by the users of ionizing radiation sources

    International Nuclear Information System (INIS)

    1992-01-01

    The Radiological Emergency Plan foresees all the possible radiological accidents with the ionizing sources the entity is using. The measures should be adopted by every factor is supped to take part in the emergencies created. The effectiveness of the guaranteed. THis guide establishes the model for elaborating the radiological Emergency Plans

  19. Guide to oil spill exercise planning

    International Nuclear Information System (INIS)

    1996-01-01

    The International Convention on Oil Pollution Preparedness, Response and Cooperation (OPRC Convention) foresees a future in which all at risk states have national oil spill preparedness and response plans. The Convention also encourages the idea that national plans be developed in cooperation with oil and shipping industries. The ultimate test of any contingency plan is measured by performance in a real emergency. It is vital, therefore, that any programme for developing a national contingency plan must include an ongoing programme to test the plan through realistic exercises. An exercise programme must progressively prepare the Oil Spill Energy Response Team to perform effectively in realistic representations of the risks that the contingency plan has been designed to meet. This report has been designed to guide all those in government or industry who are faced with the responsibility of developing and managing oil spill response exercises at all levels. It carries with it the authority that derives from peer review by many centres of oil spill response excellence around the world. It is well-illustrated with brief case histories of exercises that have been carried out by many IPIECA member companies. Each of those companies has indicated its preparedness to share more information by providing contact name and address details within this report. (author)

  20. Fiducial marker guided stereotactic liver radiotherapy: Is a time delay between marker implantation and planning CT needed?

    DEFF Research Database (Denmark)

    Worm, Esben S; Bertholet, Jenny; Høyer, Morten

    2016-01-01

    To minimize the risk of marker migration in fiducial marker guided liver SBRT it is common to add a delay of a week between marker implantation and planning CT. This study found that such a delay is unnecessary and could be avoided to minimize the treatment preparation time.......To minimize the risk of marker migration in fiducial marker guided liver SBRT it is common to add a delay of a week between marker implantation and planning CT. This study found that such a delay is unnecessary and could be avoided to minimize the treatment preparation time....

  1. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    BOOM, R.J.

    1999-01-01

    Section I: Background Return on Investment (ROI) Proposal Preparation Guide-- Over $1.9M is available to fund fiscal year (FY) 2000 waste minimization projects on the Hanford Site. This money was allocated by the US. Department of Energy Headquarters (DOE-HQ). The U.S. Department of Energy, Richland Operations (RL) and the U.S. Department of Energy, Office of River Protection (ORP) are currently seeking pollution prevention proposals from across the Hanford Site that provide a high return-on-investment (ROI) by reducing waste and associated management costs. Purpose of ROI Training The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to RL for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding. This guide accompanies the one-hour training workshop on how to prepare and submit an ROI proposal

  2. TOGAF 9 foundation study guide preparation for the TOGAF 9 part 1 examination

    CERN Document Server

    Harrison, Rachel

    2013-01-01

    This title is a Study Guide for Togaf® 9 Foundation. It gives an overview of every learning objective for the Togaf 9 Foundation Syllabus and in-depth coverage on preparing and taking the Togaf 9 Part 1 Examination. It is specifically designed to help individuals prepare for certification. This Study Guide is excellent material for: * Individuals who require a basic understanding of Togaf 9; * Professionals who are working in roles associated with an architecture project such as those responsible for planning, execution, development, delivery, and operation; * Architects who are looking for a first introduction to Togaf 9; * Architects who want to achieve Level 2 certification in a stepwise manner and have not previously qualified as Togaf 8 Certified. A prior knowledge of enterprise architecture is advantageous but not required.

  3. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  4. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    Valero, O.J.

    1998-01-01

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding

  5. Planning and preparing for emergency response to transport accidents involving radioactive material. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of this Safety Guide is to provide guidance to the public authorities and others (including consignors, carriers and emergency response authorities) who are responsible for developing and establishing emergency arrangements for dealing effectively and safely with transport accidents involving radioactive material. It may assist those concerned with establishing the capability to respond to such transport emergencies. It provides guidance for those Member States whose involvement with radioactive material is just beginning. It also provides guidance for those Member States that have already developed their radioactive material industries and the attendant emergency plans but that may need to review and improve these plans

  6. 75 FR 39916 - Endangered and Threatened Species; Notice of Intent to Prepare a Recovery Plan for the Sei Whale

    Science.gov (United States)

    2010-07-13

    ... Fisheries Service (NMFS) is announcing its intent to prepare a recovery plan for the Sei Whale (Balaenoptera... the fax comments as ``Sei Whale Recovery Plan Information'' 3. Mail: National Marine Fisheries Service... under the ESA. The recovery planning process is guided by the statutory language of Section 4(f) of the...

  7. AI-guided parameter optimization in inverse treatment planning

    International Nuclear Information System (INIS)

    Yan Hui; Yin Fangfang; Guan Huaiqun; Kim, Jae Ho

    2003-01-01

    An artificial intelligence (AI)-guided inverse planning system was developed to optimize the combination of parameters in the objective function for intensity-modulated radiation therapy (IMRT). In this system, the empirical knowledge of inverse planning was formulated with fuzzy if-then rules, which then guide the parameter modification based on the on-line calculated dose. Three kinds of parameters (weighting factor, dose specification, and dose prescription) were automatically modified using the fuzzy inference system (FIS). The performance of the AI-guided inverse planning system (AIGIPS) was examined using the simulated and clinical examples. Preliminary results indicate that the expected dose distribution was automatically achieved using the AI-guided inverse planning system, with the complicated compromising between different parameters accomplished by the fuzzy inference technique. The AIGIPS provides a highly promising method to replace the current trial-and-error approach

  8. Community Living Skills Guide: Cooking/Food Preparation.

    Science.gov (United States)

    Nickovich, Marti; Kreps, Alice Roelofs

    One of twenty course guides in the Community Living Skills Guide for the College for Living series, this document provides guidelines and workbook activities for the course, Cooking/Food Preparation. The series of courses for developmentally disabled adults is intended to supplement residential programs and to aid in orienting institutionalized…

  9. Family-Directed Transition Planning Guide.

    Science.gov (United States)

    Colorado State Dept. of Education, Denver. Div. of Special Education Services.

    This guide to family-directed transition planning is intended to help parents and students with disabilities take leading roles in the process of transition from school to post-school activities. First, a letter to families examines the challenge of change and the transition process. Section 2 examines regulations that affect transition planning,…

  10. Fuzzy logic guided inverse treatment planning

    International Nuclear Information System (INIS)

    Yan Hui; Yin Fangfang; Guan Huaiqun; Kim, Jae Ho

    2003-01-01

    A fuzzy logic technique was applied to optimize the weighting factors in the objective function of an inverse treatment planning system for intensity-modulated radiation therapy (IMRT). Based on this technique, the optimization of weighting factors is guided by the fuzzy rules while the intensity spectrum is optimized by a fast-monotonic-descent method. The resultant fuzzy logic guided inverse planning system is capable of finding the optimal combination of weighting factors for different anatomical structures involved in treatment planning. This system was tested using one simulated (but clinically relevant) case and one clinical case. The results indicate that the optimal balance between the target dose and the critical organ dose is achieved by a refined combination of weighting factors. With the help of fuzzy inference, the efficiency and effectiveness of inverse planning for IMRT are substantially improved

  11. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-07-15

    ... Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY... guidance ``PAG Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents... ``anonymous access'' system, which means the EPA will not know your identity or contact information unless you...

  12. Guided access cavity preparation using cone-beam computed tomography and optical surface scans - an ex vivo study

    DEFF Research Database (Denmark)

    Buchgreitz, J; Buchgreitz, M; Mortensen, D

    2016-01-01

    AIM: To evaluate ex vivo, the accuracy of a preparation procedure planned for teeth with pulp canal obliteration (PCO) using a guide rail concept based on a cone-beam computed tomography (CBCT) scan merged with an optical surface scan. METHODOLOGY: A total of 48 teeth were mounted in acrylic bloc...

  13. Model State Plan Characteristics. A Guide for Refining State Plans for Career Education.

    Science.gov (United States)

    Mitchell, Anita

    This guide for refining state plans for career education was developed to assist states in revision of their state plans to satisfy requirements of Public Law 95-207. The guide is divided into fourteen chapters. Chapter 1, the introduction, contains background information on the assessment conducted to develop the guidelines. (A full report of…

  14. The Local Agenda 21 Planning Guide: An Introduction to ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Local Agenda 21 Planning Guide is an introductory guide on the planning elements, methods, and tools being used by local governments to implement Agenda ... International Water Resources Association, in close collaboration with IDRC, is holding a webinar titled “Climate change and adaptive water management: ...

  15. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  16. Food Preparation and Service: Cluster Guide.

    Science.gov (United States)

    Central Michigan Univ., Mount Pleasant.

    This teacher's guide is one of a series of publications focusing on the occupational preparation of persons with special education needs. The material was developed and tested by cooperating teachers over a period of three years. Task analysis information is presented using occupational descriptions from the Dictionary of Occupational Titles,…

  17. Menu Planning Guide for School Food Service. Revised.

    Science.gov (United States)

    VanEgmont-Pannell, Dorothy; And Others

    This menu planning guide for school lunches and breakfasts contains: (1) lunch requirements, recommendations, and policies; (2) the basics of menu planning; (3) how to vary portions for various age/grade groups; (4) planning breakfasts; (5) merchandising school lunches and breakfasts; and (6) nutrition education and menu planning; Appendixes…

  18. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    Science.gov (United States)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  19. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  20. 9 CFR 108.3 - Preparation of plot plans.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Preparation of plot plans. 108.3... LICENSED ESTABLISHMENTS § 108.3 Preparation of plot plans. Plot plans shall show all of the buildings on a... on the plot plan the use of immediate adjacent properties such as, residential area, pasture, box...

  1. Atlas-guided prostate intensity modulated radiation therapy (IMRT) planning

    International Nuclear Information System (INIS)

    Sheng, Yang; Li, Taoran; Zhang, You; Lee, W Robert; Yin, Fang-Fang; Wu, Q Jackie; Ge, Yaorong

    2015-01-01

    An atlas-based IMRT planning technique for prostate cancer was developed and evaluated. A multi-dose atlas was built based on the anatomy patterns of the patients, more specifically, the percent distance to the prostate and the concaveness angle formed by the seminal vesicles relative to the anterior-posterior axis. A 70-case dataset was classified using a k-medoids clustering analysis to recognize anatomy pattern variations in the dataset. The best classification, defined by the number of classes or medoids, was determined by the largest value of the average silhouette width. Reference plans from each class formed a multi-dose atlas. The atlas-guided planning (AGP) technique started with matching the new case anatomy pattern to one of the reference cases in the atlas; then a deformable registration between the atlas and new case anatomies transferred the dose from the atlas to the new case to guide inverse planning with full automation. 20 additional clinical cases were re-planned to evaluate the AGP technique. Dosimetric properties between AGP and clinical plans were evaluated. The classification analysis determined that the 5-case atlas would best represent anatomy patterns for the patient cohort. AGP took approximately 1 min on average (corresponding to 70 iterations of optimization) for all cases. When dosimetric parameters were compared, the differences between AGP and clinical plans were less than 3.5%, albeit some statistical significances observed: homogeneity index (p  >  0.05), conformity index (p  <  0.01), bladder gEUD (p  <  0.01), and rectum gEUD (p  =  0.02). Atlas-guided treatment planning is feasible and efficient. Atlas predicted dose can effectively guide the optimizer to achieve plan quality comparable to that of clinical plans. (paper)

  2. The BWR owners' group planning guide for life extension

    International Nuclear Information System (INIS)

    Smith, S.K.; Lehnert, D.F.; Locke, R.K.

    1991-01-01

    Extending the operating life of a commercial nuclear power plant has been shown to be economically beneficial to both the utility and the electric customer. As such, many utilities are planning and implementing plant life extension (PLEX) programs. A document has been developed which provides guidance to utilities in formulating a PLEX program plant for one or more boiling water reactor (BWR) plants. The guide has been developed by the BWR Owners' Group Plant Life Extension Committee. The principal bases for this guide were the BWR Pilot and Lead Plant Programs. These programs were used as models to develop the 'base plan' described in this guide. By formulating their program plant utilizing the base plan, utilities will be able to maximize the use of existing evaluations and results. The utility planner will build upon the base plan by adding any tasks or features that are unique to their programs. (author)

  3. PFP functional development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Functional Development Planning Guide presents the strategy and process used for the identification, development, and analysis of functions (activities) necessary to satisfy the requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. The functional analysis will provide the basis for the development of a function driven work breakdown structure. Future revisions to this document will include as attachments the results of the PFP Functional Analysis resulting from this approach. This document is intended be a Project-owned management tool. As such, the guide will periodically require revisions resulting from improvements of the information, processes, and techniques as now described

  4. Marketing and Distributive Education Curriculum Planning Guide.

    Science.gov (United States)

    Northern Illinois Univ., DeKalb. Dept. of Business Education and Administration Services.

    This planning guide in marketing and distributive education is designed to provide the curriculum coordinator and instructor with a basis for planning a comprehensive program in the career field of marketing. Such programs require competencies in sales, sales promotion, buying, transporting, storing, financing, marketing research, and management.…

  5. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  6. The Ernst & Young Business Plan Guide

    CERN Document Server

    Ford, Brian R; Pruitt, Patrick T; Young, Ernst

    2010-01-01

    In today's competitive business environment, a well thought out business plan is more important than ever before. Not only can it assist you in raising the money needed to start or expand a business-by attracting the interest of potential investors-but it can also help you keep tabs on your progress once the business is up and running.Completely revised and updated to reflect today's dynamic business environment, The Ernst & Young Business Plan Guide, Third Edition leads you carefully through every aspect involved in researching, writing, and presenting a winning business plan. Illustrating ea

  7. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  8. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  9. Self-Study Guide for Florida VPK Provider Improvement Plan Development

    Science.gov (United States)

    Phillips, Beth M.; Mazzeo, Debbie; Smith, Kevin

    2016-01-01

    This Self-Study Guide has been developed to support Florida Voluntary Prekindergarten Providers (VPK) who are required to complete an improvement plan process (i.e., low-performing providers). The guide has sections that can be used during both the process of selecting target areas for an improvement plan and the process of implementing new or…

  10. Development of Secondary Route Bridge Design Plan Guides

    Science.gov (United States)

    2018-03-03

    The objective of this study is to develop a set of bridge plan guides for low-volume traffic roads. The purpose of the plans is to facilitate construction of new structures suitable for local agencies. The designs are to specifically address common l...

  11. Standard guide for metallographic preparation of thermal sprayed coatings

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2003-01-01

    1.1 This guide covers recommendations for sectioning, cleaning, mounting, grinding, and polishing to reveal the microstructural features of thermal sprayed coatings (TSCs) and the substrates to which they are applied when examined microscopically. Because of the diversity of available equipment, the wide variety of coating and substrate combinations, and the sensitivity of these specimens to preparation technique, the existence of a series of recommended methods for metallographic preparation of thermal sprayed coating specimens is helpful. Adherence to this guide will provide practitioners with consistent and reproducible results. Additional information concerning standard practices for metallographic preparation can be found in Practice E 3. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitatio...

  12. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  13. Community energy and emissions planning : a guide for BC local governments

    International Nuclear Information System (INIS)

    2008-09-01

    British Columbia (BC) local governments are becoming more interested in completing an energy and greenhouse gas emissions plan for their community as awareness of climate change grows and energy prices escalate. The purpose of this guide was to support local government elected officials and staff in undertaking an energy and emissions planning process. This guide described the purpose and content of a community energy and emissions plan, its benefits, and how to go about creating one. Specifically, the guide provided practical tips, examples from BC communities, and links to more detailed information. Topics that were presented in the guide included engagement; inventories; target-setting; action plan; implementation and monitoring; and funding and resources. It was concluded that the key to long-term success is to maintain good communication with council/board, staff and the public. The document emphasized that it is important to make sure that people know the work being undertaken, and the results achieved, so that momentum is not lost. refs., tabs., figs

  14. Lexical Complexity of Decision-Making Writing Tasks: Form-focused Guided Strategic Planning

    OpenAIRE

    Mahdavirad, Fatemeh

    2016-01-01

    The present study is an attempt to investigate the effect of form-focused guided strategic planning on lexical complexity of learners’ performance in writing tasks. The twenty intermediate level participants of the study performed an unplanned and then a planned decision-making task. In the planned task condition, the participants were provided with form-focused guided strategic planning which contained detailed instructions about how to plan, by being instructed to focus on form. The guidanc...

  15. Back-to-School Countdown: A Planning Guide for Time-Conscious Teachers.

    Science.gov (United States)

    Spann, Mary Beth

    1991-01-01

    This planning guide for efficient use of the last weeks before school opens offers ideas for interactive hall and wall displays, a guide to self-made math manipulatives, a materials checklist, a four-week task planning countdown, and a listing of teacher resource books and other classroom materials. (SM)

  16. VOC-Arid Integrated Demonstration guide to preparation of demonstration documents

    International Nuclear Information System (INIS)

    Jensen, E.J.; Brouns, T.M.; Koegler, K.J.; McCabe, G.H.; Morris, F.A.

    1994-06-01

    This guide has been prepared by Demonstration Operations of the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). Its purpose is to describe demonstration documents, designate responsibilities for these documents, and guide the Principal Investigator (PI) and others in their preparation. The main emphasis of this guide is to describe the documentation required of the PI. However, it does cover some of the responsibilities of other members of the VOC-Arid ID team. The VOC-Arid ID is one of several US Department of Energy (DOE) integrated demonstrations designed to support the demonstration of emerging environmental management and restoration technologies. The principal objective of the VOC-Arid ID is to identify, develop, and demonstrate new and innovative technologies for environmental restoration at arid or semiarid sites containing volatile organic compounds with or without associated contamination (e.g., radionuclides and metals)

  17. Critical care management of major disasters: a practical guide to disaster preparation in the intensive care unit.

    Science.gov (United States)

    Corcoran, Shawn P; Niven, Alexander S; Reese, Jason M

    2012-02-01

    Recent events and regulatory mandates have underlined the importance of medical planning and preparedness for catastrophic events. The purpose of this review is to provide a brief summary of current commonly identified threats, an overview of mass critical care management, and a discussion of resource allocation to provide the intensive care unit (ICU) director with a practical guide to help prepare and coordinate the activities of the multidisciplinary critical care team in the event of a disaster.

  18. Strategic Planning in Education: A Guide for Policymakers.

    Science.gov (United States)

    Cooper, Harry A.

    As defined in chapter I of this guide for policymakers, strategic planning is the method by which an organization identifies relevant trends in its environment, analyzes their potential implications, and projects an integrated strategy to address these future events and their contingencies. This process differs from formalized planning, based on…

  19. U.S. Arctic Voyage Planning Guide (AVPG)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Arctic Voyage Planning Guide is a compilation of official U.S. Government information and references to sources of information that may be consulted by mariners...

  20. Culinary Arts Hospitality Symposium Planning Guide.

    Science.gov (United States)

    Borgie, Karen; Wang, Yeimei

    This guide was developed as part of a project to standardize California's statewide culinary arts curriculum based on industry guidelines and standards. It details a process that California community colleges can use to plan a hospitality symposium that will accomplish the following objectives: provide students with a forum to demonstrate their…

  1. Wilmar Planning Tool, user guide

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Helge V.

    2006-01-15

    This is a short user guide to the Wilmar Planning Tool developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. In the User Shell various scenario variables and control parameters are set, and export of model data from the input database, activation of the models, as well as import of model results to the output database are triggered from the shell. (au)

  2. Wilmar Planning Tool, user guide

    International Nuclear Information System (INIS)

    Larsen, Helge V.

    2006-01-01

    This is a short user guide to the Wilmar Planning Tool developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. In the User Shell various scenario variables and control parameters are set, and export of model data from the input database, activation of the models, as well as import of model results to the output database are triggered from the shell. (au)

  3. Guide to preparing SAND Reports and other communication products.

    Energy Technology Data Exchange (ETDEWEB)

    2009-02-01

    This guide describes the R&A process, Common Look and Feel requirements, and preparation and publishing procedures for communication products at Sandia National Laboratories. Samples of forms and examples of published communications products are provided.

  4. Guided Autotransplantation of Teeth: A Novel Method Using Virtually Planned 3-dimensional Templates.

    Science.gov (United States)

    Strbac, Georg D; Schnappauf, Albrecht; Giannis, Katharina; Bertl, Michael H; Moritz, Andreas; Ulm, Christian

    2016-12-01

    The aim of this study was to introduce an innovative method for autotransplantation of teeth using 3-dimensional (3D) surgical templates for guided osteotomy preparation and donor tooth placement. This report describes autotransplantation of immature premolars as treatment of an 11-year-old boy having suffered severe trauma with avulsion of permanent maxillary incisors. This approach uses modified methods from guided implant surgery by superimposition of Digital Imaging and Communications in Medicine files and 3D data sets of the jaws in order to predesign 3D printed templates with the aid of a fully digital workflow. The intervention in this complex case could successfully be accomplished by performing preplanned virtual transplantations with guided osteotomies to prevent bone loss and ensure accurate donor teeth placement in new recipient sites. Functional and esthetic restoration could be achieved by modifying methods used in guided implant surgery and prosthodontic rehabilitation. The 1-year follow-up showed vital natural teeth with physiological clinical and radiologic parameters. This innovative approach uses the latest diagnostic methods and techniques of guided implant surgery, enabling the planning and production of 3D printed surgical templates. These accurate virtually predesigned surgical templates could facilitate autotransplantation in the future by full implementation of recommended guidelines, ensuring an atraumatic surgical protocol. Copyright © 2016 American Association of Endodontists. Published by Elsevier Inc. All rights reserved.

  5. VET Providers Planning to Deliver Degrees: Good Practice Guide

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2015

    2015-01-01

    This good practice guide is intended to assist public and private registered training organisations (RTOs) planning to commence higher education (HE) delivery. The guide is based on research undertaken by Victor Callan and Kaye Bowman, who completed case studies with six providers currently delivering higher education qualifications in addition to…

  6. Integrating Resources into Curriculum with the Systems Connect Planning Guide

    Science.gov (United States)

    Oshry, A.; Bean, J. R.

    2017-12-01

    A broadly applicable and guided approach for planning curriculum and instruction around new academic standards or initiatives is critical for implementation success. Curriculum and assessment differs across schools and districts, so built-in adaptability is important for maximal adoption and ease of use by educators. The Systems Connect Planning Guide directs the flow of instruction for building conceptual links between topics in a unit/curriculum through critical vetting and integration of relevant resources. This curricular template is flexible for use in any setting or subject area, and ensures applicability, high impact and responsiveness to academic standards while providing inquiry-based, real-world investigations and action that incorporate authentic research and data. These needs are what informed the creation of the three components of the planning guide:• Curriculum Anchor: alignment with academic standards & learning outcomes and setting the context of the topic• Issues Investigations: informing how students explore topics, and incorporate authentic research and data into learning progressions• Civic Action: development of how students could apply their knowledgeThe Planning Guide also incorporates criteria from transdisciplinary practices, cross-cutting concepts, and organizational charts for outlining guiding questions and conceptual links embedded in the guide. Integration of experiential learning and real-world connections into curricula is important for proficiency and deeper understanding of content, replacing discrete, stand-alone experiences which are not explicitly connected. Rather than information being dispelled through individual activities, relying on students to make the connections, intentionally documenting explicit connections provides opportunities to foster deeper understanding by building conceptual links between topics, which is how fundamental knowledge about earth and living systems is gained. Through the critical vetting

  7. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  8. Drunk Driving Public Information Program Strategies and Planning Guide.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  9. Lexical Complexity of Decision-Making Writing Tasks: Form-focused Guided Strategic Planning

    Directory of Open Access Journals (Sweden)

    Fatemeh Mahdavirad

    2016-06-01

    Full Text Available The present study is an attempt to investigate the effect of form-focused guided strategic planning on lexical complexity of learners’ performance in writing tasks. The twenty intermediate level participants of the study performed an unplanned and then a planned decision-making task. In the planned task condition, the participants were provided with form-focused guided strategic planning which contained detailed instructions about how to plan, by being instructed to focus on form. The guidance included an explanation of the necessary structural and lexical patterns employed to express the learners’ views while developing a comparison-and-contrast paragraph in each task. The results of the statistical analysis indicated that the participants produced a written product with a greater lexical complexity in their performance of the task in the form-focused strategic planning condition. The findings emphasize the importance of guided strategic planning as a task condition in syllabus design for task-based language teaching and the necessity of incorporating this task feature for accomplishing lexical complexity in decision-making writing tasks.

  10. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  11. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  12. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  13. Career/Vocational Preparation for Students with Disabilities: A Program Improvement Guide.

    Science.gov (United States)

    Stodden, Robert A.

    This program improvement guide is designed to assist district and school level interdisciplinary planning teams to improve career/vocational programs for students with disabilities. Its focus is on the integration of best practices within the educational program continuum to achieve positive student outcomes. The guide includes three sections.…

  14. Preparing for the Market. Teacher Edition. Fashion Buying Series.

    Science.gov (United States)

    Collins, Cindy

    This teacher's guide presents material for a unit on preparing for the retail fashion market. Content focuses on merchandise plans, computing open-to-buy, computing turnover, the components of a model stock plan, and criteria used when selecting a supplier. The guide contains 5 objectives, 6 group learning activities keyed to the objectives, 21…

  15. Guide Manual for Preparation of Water Balances

    Science.gov (United States)

    1980-11-01

    boundaries for the AGUA study (39). This figure was developed from a LANDSAT photograph of the Albuquerque, New Mexico area. It clearly shows the boundaries of...Guide to Water-Management Alternatives. USGS Professional Paper 627-F. 12. Gilbert, J. B. and Associates, 1977. Report on Water Conservation Reuse and...Report on Water Conservation Reuse and Supply, San Francisco Bay Region, prepared by J. B. Gilbert and Associates, 1978. (12) Purposes of this study

  16. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  17. Indicator based controlling of cantonal guiding planning in Switzerland: A model for more efficient sustainable planning instruments at the regional level

    Directory of Open Access Journals (Sweden)

    Keiner Marco

    2003-01-01

    Full Text Available In the actual Swiss cantonal planning practice every 10 years in general, there is a review of the guiding plan. The plan’s evaluation typically takes place shortly before the revision process. In the interstitial time, the guiding plan’s effectiveness can only be anticipated. In the review, a survey of both, the desired and unwanted spatial effects are often absent. As a result, a thorough analysis of the effects and the direction of the spatial development cannot be accomplished. A spatial plan that is geared to the principle of sustainability needs the outputs of such an analysis. Development assessments are required to verify the plans’ effects, well-defined goals to assist in rectifying deviations, key indicators to identify efficiency potentials, and precautionary measures to allow for an adaptable and responsive planning methodology. The instruments, which might assist in the cantonal guiding plan objectives implementation, do exist. Such instruments are monitoring, controlling and benchmarking (with the support of indicators. These tools can assist in ensuring the plan’s overall value and the effectiveness and appropriateness of the ensuing development. By using these tools and a sound planning methodology, unsustainable spatial development can be tracked early and rectified with appropriated measures. The control as this system’s central instrument is presented here and its application opportunities in the cantonal guiding planning are discussed. In order to achieve a sustainable spatial development and a more dynamic guiding planning, the application of control and benchmarking is crucial.

  18. Drupal The Guide to Planning and Building Websites

    CERN Document Server

    McCourt, Cynthia

    2011-01-01

    A complete lifecycle guide to planning and building a site with Drupal Drupal allows you to quickly and easily build a wide variety of web sites, from very simple blog sites to extremely complex sites that integrate with other systems. In order to maximize what Drupal can do for you, you need to plan. Whether you are building with Drupal 6 or 7, this book details the steps necessary to plan your site so you can make informed decisions before you start to build.Explains how to define the scope of your projectShows you how to create a design plan taking into consideration how Drupal worksHelps y

  19. Weather integration in TMC operations : a self-evaluation and planning guide.

    Science.gov (United States)

    2009-04-01

    This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...

  20. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2018-04-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  1. 32 CFR Appendix A to Part 1290 - Preparation Guide for DD Form 1805, Violation Notice

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Preparation Guide for DD Form 1805, Violation Notice A Appendix A to Part 1290 National Defense Other Regulations Relating to National Defense DEFENSE.... DISTRICT COURTS Pt. 1290, App. A Appendix A to Part 1290—Preparation Guide for DD Form 1805, Violation...

  2. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  3. Planning for Workforce Reductions: A Technical Assistance Guide for Employers.

    Science.gov (United States)

    Balfe, Kevin

    This guide is designed to help employers plan work force reductions. It emphasizes positive collaboration with workers and the community to find new jobs for workers and maintain morale and productivity in the plant. The guide is divided into five chapters. The first chapter acquaints the reader with some of the benefits of work force reduction…

  4. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    Science.gov (United States)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. Everyday meal preparation for people with dementia

    DEFF Research Database (Denmark)

    Iversen, Mette Kathrine Friis; Nejsum, Hanne Lindberg; Bendtsen, Trine Vase

    When people are diagnosed with dementia everyday activities like meal preparation will gradually become more difficult. A recipe is a support for meal preparation but as dementia develops, it seems that following a recipe can be a challenge. In Denmark health professionals often use meal preparat......When people are diagnosed with dementia everyday activities like meal preparation will gradually become more difficult. A recipe is a support for meal preparation but as dementia develops, it seems that following a recipe can be a challenge. In Denmark health professionals often use meal...... preparation as an activity for people with dementia but they have no combined material to base the planning of the activity on. The thesis of this project is that when persons with dementia is involved in cooking his or her own meal meal preparation it will contribute to the feeling of content and meaning...... preparation. The guide includes ideas for constructing recipes, methods for planning and guiding the process and examples of utensils that can increase the ability to cook in the persons own home or in an institutionalized setting. This supports the person with dementia both nutritionally, cognitively...

  6. Community Solutions for Stormwater Management: A Guide for Voluntary Long-Term Planning

    Science.gov (United States)

    This draft guide describes how to develop a comprehensive long-term community stormwater plan that integrates stormwater management with communities’ broader plans for economic development, infrastructure investment and environmental compliance.

  7. Atlas-guided generation of pseudo-CT images for MRI-only and hybrid PET-MRI-guided radiotherapy treatment planning

    DEFF Research Database (Denmark)

    Arabi, H.; Koutsouvelis, N.; Rouzaud, M.

    2016-01-01

    Magnetic resonance imaging (MRI)-guided attenuation correction (AC) of positron emission tomography (PET) data and/or radiation therapy (RT) treatment planning is challenged by the lack of a direct link between MRI voxel intensities and electron density. Therefore, even if this is not a trivial t......-CT images from conventional Dixon MRI sequences with improved bone extraction accuracy. The approach is promising for potential use in PET AC and MRI-only or hybrid PET/MRI-guided RT treatment planning. © 2016 Institute of Physics and Engineering in Medicine.......Magnetic resonance imaging (MRI)-guided attenuation correction (AC) of positron emission tomography (PET) data and/or radiation therapy (RT) treatment planning is challenged by the lack of a direct link between MRI voxel intensities and electron density. Therefore, even if this is not a trivial...... the conventional MRI segmentation technique and a recently proposed multi-atlas approach. The clinical studies consisted of pelvic CT, PET and MRI scans of 12 patients with loco-regionally advanced rectal disease. In the first step, bone segmentation of the target image is optimized through local weighted atlas...

  8. Guide to preparing SAND reports and other communication products : version 2.0.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Debra M.; Brittenham, Phillip W.

    2005-12-01

    This guide describes the R&A process, Common Look and Feel requirements, and preparation and publishing procedures for communication products at Sandia National Laboratories. Samples of forms and examples of published communications products are provided. This guide details the processes for producing a variety of communication products at Sandia National Laboratories. Figure I-1 shows the general publication development process. Because extensive supplemental material is available from Sandia on the internal Web or from external sources (Table I-1), the guide has been shortened to make it easy to find information that you need.

  9. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  10. Business Continuity Planning for Nursing Schools: Preparation for Potential Disasters.

    Science.gov (United States)

    Zerwic, Julie J; Rosen, Denise

    2016-01-01

    Nursing schools are vulnerable to disasters, ranging from pandemics to weather emergencies, fires, and acts of terrorism. To ensure minimal disruptions to teaching, provision of care, research, and other critical missions, nursing faculty and administrative leaders should develop a business continuity plan. The business continuity plan can help faculty, students, and administration identify critical functions and alternative plans if an emergency occurs. We offer our experience as a guide for other nursing schools.

  11. Functional image-guided stereotactic body radiation therapy planning for patients with hepatocellular carcinoma

    Energy Technology Data Exchange (ETDEWEB)

    Tsegmed, Uranchimeg [Department of Radiation Oncology, Graduate School of Biomedical and Health Sciences, Hiroshima University, Hiroshima (Japan); Kimura, Tomoki, E-mail: tkkimura@hiroshima-u.ac.jp [Department of Radiation Oncology, Graduate School of Biomedical and Health Sciences, Hiroshima University, Hiroshima (Japan); Nakashima, Takeo [Division of Radiation Therapy, Hiroshima University Hospital, Hiroshima (Japan); Nakamura, Yuko; Higaki, Toru [Department of Diagnostic Radiology, Graduate School of Biomedical and Health Sciences, Hiroshima University, Hiroshima (Japan); Imano, Nobuki; Doi, Yoshiko; Kenjo, Masahiro; Ozawa, Shuichi; Murakami, Yuji [Department of Radiation Oncology, Graduate School of Biomedical and Health Sciences, Hiroshima University, Hiroshima (Japan); Awai, Kazuo [Department of Diagnostic Radiology, Graduate School of Biomedical and Health Sciences, Hiroshima University, Hiroshima (Japan); Nagata, Yasushi [Department of Radiation Oncology, Graduate School of Biomedical and Health Sciences, Hiroshima University, Hiroshima (Japan)

    2017-07-01

    The aim of the current planning study is to evaluate the ability of gadoxetate disodium-enhanced magnetic resonance imaging (EOB-MRI)–guided stereotactic body radiation therapy (SBRT) planning by using intensity-modulated radiation therapy (IMRT) techniques in sparing the functional liver tissues during SBRT for hepatocellular carcinoma. In this study, 20 patients with hepatocellular carcinoma were enrolled. Functional liver tissues were defined according to quantitative liver-spleen contrast ratios ≥ 1.5 on a hepatobiliary phase scan. Functional images were fused with the planning computed tomography (CT) images; the following 2 SBRT plans were designed using a “step-and-shoot” static IMRT technique for each patient: (1) an anatomical SBRT plan optimization based on the total liver; and (2) a functional SBRT plan based on the functional liver. The total prescribed dose was 48 gray (Gy) in 4 fractions. Dosimetric parameters, including dose to 95% of the planning target volume (PTV D{sub 95%}), percentages of total and functional liver volumes, which received doses from 5 to 30 Gy (V5 to V30 and fV5 to fV30), and mean doses to total and functional liver (MLD and fMLD, respectively) of the 2 plans were compared. Compared with anatomical plans, functional image-guided SBRT plans reduced MLD (mean: plan A, 5.5 Gy; and plan F, 5.1 Gy; p < 0.0001) and fMLD (mean: plan A, 5.4 Gy; and plan F, 4.9 Gy; p < 0.0001), as well as V5 to V30 and fV5 to fV30. No differences were noted in PTV coverage and nonhepatic organs at risk (OARs) doses. In conclusion, EOB-MRI–guided SBRT planning using the IMRT technique may preserve functional liver tissues in patients with hepatocellular carcinoma (HCC).

  12. Beam's-Eye-View Dosimetrics-Guided Inverse Planning for Aperture-Modulated Arc Therapy

    International Nuclear Information System (INIS)

    Ma Yunzhi; Popple, Richard; Suh, Tae-Suk; Xing Lei

    2009-01-01

    Purpose: To use angular beam's-eye-view dosimetrics (BEVD) information to improve the computational efficiency and plan quality of inverse planning of aperture-modulated arc therapy (AMAT). Methods and Materials: In BEVD-guided inverse planning, the angular space spanned by a rotational arc is represented by a large number of fixed-gantry beams with angular spacing of ∼2.5 degrees. Each beam is assigned with an initial aperture shape determined by the beam's-eye-view (BEV) projection of the planning target volume (PTV) and an initial weight. Instead of setting the beam weights arbitrarily, which slows down the subsequent optimization process and may result in a suboptimal solution, a priori knowledge about the quality of the beam directions derived from a BEVD is adopted to initialize the weights. In the BEVD calculation, a higher score is assigned to directions that allow more dose to be delivered to the PTV without exceeding the dose tolerances of the organs at risk (OARs) and vice versa. Simulated annealing is then used to optimize the segment shapes and weights. The BEVD-guided inverse planning is demonstrated by using two clinical cases, and the results are compared with those of a conventional approach without BEVD guidance. Results: An a priori knowledge-guided inverse planning scheme for AMAT is established. The inclusion of BEVD guidance significantly improves the convergence behavior of AMAT inverse planning and results in much better OAR sparing as compared with the conventional approach. Conclusions: BEVD-guidance facilitates AMAT treatment planning and provides a comprehensive tool to maximally use the technical capacity of the new arc therapeutic modality.

  13. NASA deep space network operations planning and preparation

    Science.gov (United States)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  14. OntoEmergePlan: variability of emergency plans supported by a domain ontology

    NARCIS (Netherlands)

    Ferreira, Maria I.G.B; Moreira, João; Campos, Maria Luiza M.; Braga, Bernardo F.B; Sales, Tiago P.; de Cordeiro, Kelli F.; Borges, Marcos R.S.

    2015-01-01

    The preparation of high quality emergency plans to guide operational decisions is an approach to mitigate the emergency management complexity. In such multidisciplinary scenario, teams with different perspectives need to collaborate towards a common goal and interact within a common understanding.

  15. Guide to preparing SAND reports and other communication products.

    Energy Technology Data Exchange (ETDEWEB)

    2011-09-01

    This guide describes the R&A process, Common Look and Feel requirements, and preparation and publishing procedures for communication products at Sandia National Laboratories. Samples of forms and examples of published communications products are provided. This guide takes advantage of the wealth of material now available on the Web as a resource. Therefore, it is best viewed as an electronic document. If some of the illustrations are too small to view comfortably, you can enlarge them on the screen as needed. The format of this document is considerably different than that usually expected of a SAND Report. It was selected to permit the large number of illustrations and examples to be placed closer to the text that references them. In the case of forms, covers, and other items that are included as examples, a link to the Web is provided so that you can access the items and download them for use. This guide details the processes for producing a variety of communication products at Sandia National Laboratories. Figure I-1 shows the general publication development process. Because extensive supplemental material is available from Sandia on the internal web or from external sources (Table I-1), the guide has been shortened to make it easy to find information that you need.

  16. Your Business Plan: A Workbook for Small Businesses in Oregon = Su Plan de Negocio: Un Libro de Trabajo Para Empresas Pequenas en Oregon.

    Science.gov (United States)

    Sargent, Dennis J.; Chambers, Maynard N.

    Designed as an aid for those investigating the possibility of opening their first business, as well as business owners with many years experience who have never prepared a written business plan, this workbook guides the reader through the steps involved in the preparation of a business plan or feasibility study. After a general discussion of the…

  17. Export control guide: Spent nuclear fuel reprocessing and preparation of plutonium metal

    International Nuclear Information System (INIS)

    1993-10-01

    The international Treaty on the Non-Proliferation of Nuclear Weapons, also referred to as the Non-Proliferation Treaty (NPT), states in Article III, paragraph 2(b) that open-quotes Each State Party to the Treaty undertakes not to provide . . . equipment or material especially designed or prepared for the processing, use or production of special fissionable material to any non-nuclear-weapon State for peaceful purposes, unless the source or special fissionable material shall be subject to the safeguards required by this Article.close quotes This guide was prepared to assist export control officials in the interpretation, understanding, and implementation of export laws and controls relating to the international Trigger List for irradiated nuclear fuel reprocessing equipment, components, and materials. The guide also contains information related to the production of plutonium metal. Reprocessing and its place in the nuclear fuel cycle are described briefly; the standard procedure to prepare metallic plutonium is discussed; steps used to prepare Trigger List controls are cited; descriptions of controlled items are given; and special materials of construction are noted. This is followed by a comprehensive description of especially designed or prepared equipment, materials, and components of reprocessing and plutonium metal processes and includes photographs and/or pictorial representations. The nomenclature of the Trigger List has been retained in the numbered sections of this document for clarity

  18. Three-dimensional planning and use of patient-specific guides improve glenoid component position: an in vitro study.

    Science.gov (United States)

    Walch, Gilles; Vezeridis, Peter S; Boileau, Pascal; Deransart, Pierric; Chaoui, Jean

    2015-02-01

    Glenoid component positioning is a key factor for success in total shoulder arthroplasty. Three-dimensional (3D) measurements of glenoid retroversion, inclination, and humeral head subluxation are helpful tools for preoperative planning. The purpose of this study was to assess the reliability and precision of a novel surgical method for placing the glenoid component with use of patient-specific templates created by preoperative surgical planning and 3D modeling. A preoperative computed tomography examination of cadaveric scapulae (N = 18) was performed. The glenoid implants were virtually placed, and patient-specific guides were created to direct the guide pin into the desired orientation and position in the glenoid. The 3D orientation and position of the guide pin were evaluated by performing a postoperative computed tomography scan for each scapula. The differences between the preoperative planning and the achieved result were analyzed. The mean error in 3D orientation of the guide pin was 2.39°, the mean entry point position error was 1.05 mm, and the mean inclination angle error was 1.42°. The average error in the version angle was 1.64°. There were no technical difficulties or complications related to use of patient-specific guides for guide pin placement. Quantitative analysis of guide pin positioning demonstrated a good correlation between preoperative planning and the achieved position of the guide pin. This study demonstrates the reliability and precision of preoperative planning software and patient-specific guides for glenoid component placement in total shoulder arthroplasty. Copyright © 2015. Published by Elsevier Inc.

  19. Guide to nondestructive assay standards: Preparation criteria, availability, and practical considerations

    International Nuclear Information System (INIS)

    Stewart, J.E.; Hsue, S.T.; Sampson, T.E.

    1997-01-01

    For certification and measurement control, nondestructive assay (NDA) instruments and methods used for verification measurement of special nuclear materials (SNMs) require calibrations based on certified reference materials (CRMs), or working reference materials (WRMs), traceable to the national system of measurements, and adequately characteristic of the unknowns. The Department of Energy Office of Safeguards and Security is sponsoring production of a comprehensive guide to preparation of NDA standards. The scope of the report includes preparation criteria, current availability of CRMs and WRMs, practical considerations for preparation and characterization, and an extensive bibliography. In preparing the report, based primarily on experience at Los Alamos, we have found that standards preparation is highly dependent on the particular NDA method being applied. We therefore include sections that contain information specific to commonly used neutron and gamma-ray NDA techniques. 16 refs., 4 figs., 2 tabs

  20. Standard guide for preparation of plastics and polymeric specimens for microstructural examination

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2004-01-01

    1.1 This guide covers recommended procedures and guidelines for the preparation of plastic and polymeric specimens for microstructural examination by light and electron microscopy. 1.2 This guide is applicable to most semi-rigid and rigid plastics, including engineering plastics. This guide is also applicable to some non-rigid plastics. 1.3 The procedures and guidelines presented in this guide are those which generally produce satisfactory specimens. This guide does not describe the variations in techniques required to solve individual problems. 1.4 Many detailed descriptions of grinding and polishing of plastics and polymers are available (1-7). 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  1. Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans

    Science.gov (United States)

    This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.

  2. TOGAF version 9 foundation study guide preparation for the TOGAF 9 Part 1 examination

    CERN Document Server

    Harrison, Rachel

    2009-01-01

    This document is a Study Guide for TOGAF™ 9 Foundation.It gives an overview of every learning objective for the TOGAF 9 Foundation Syllabus and in-depth coverage on preparing and taking the TOGAF 9 Part 1 Examination. It is specifically designed to help individuals prepare for certification.

  3. Guide to nondestructive assay standards: Preparation criteria, availability, and practical considerations

    International Nuclear Information System (INIS)

    Hsue, S.T.; Stewart, J.E.; Sampson, T.E.; Butler, G.W.; Rudy, C.R.; Rinard, P.M.

    1997-10-01

    For certification and measurement control, nondestructive assay (NDA) instruments and methods used for verification measurements of special nuclear materials (SNMs) require calibrations based on certified reference materials (CRMs), or working reference materials (WRMs), traceable to the national system of measurements, and adequately characteristic of the unknowns. The Department of Energy Office of Safeguards and Security is sponsoring production of a comprehensive guide to preparation of NDA standards. The scope of the report includes preparation criteria, current availability of CRMs and WRMs, practical considerations for preparation and characterization, and an extensive bibliography. In preparing the report, based primarily on experience at Los Alamos, they have found that standards preparation is highly dependent on the particular NDA method being applied. They therefore include sections that contain information specific to commonly used neutron and gamma-ray NDA techniques. They also present approaches that are alternatives to, or minimize requirements for physical standards

  4. Career Preparation Program Curriculum Guide for: Hospitality/Tourism Industry (Tourist Services).

    Science.gov (United States)

    British Columbia Dept. of Education, Victoria. Curriculum Development Branch.

    This career preparation curriculum outline for the hospitality/tourism industry is intended to provide secondary and postsecondary learning outcomes for completion of program requirements. The guide is organized into four sections. Section one presents an overview of the program, of the philosophy of career education, and of the organization and…

  5. Facility effluent monitoring plan determinations for the 400 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-09-01

    This Facility Effluent Monitoring Plan determination resulted from an evaluation conducted for the Westinghouse Hanford Company 400 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans. Two major Westinghouse Hanford Company facilities in the 400 Area were evaluated: the Fast Flux Test Facility and the Fuels Manufacturing and examination Facility. The determinations were prepared by Westinghouse Hanford Company. Of these two facilities, only the Fast Flux Test Facility will require a Facility Effluent Monitoring Plan. 7 refs., 5 figs., 4 tabs

  6. General Mechanical Repair. Minor Automotive Maintenance, Small Engine [Repair, and] Welding: Curriculum Guide and Lesson Plans.

    Science.gov (United States)

    Hamlin, Larry

    This document contains a curriculum guide and lesson plans for a general mechanical repair course with three sections: minor automotive maintenance, small engine repair, and welding. The curriculum guide begins with a matrix that relates the lesson plans to essential elements of math, science, language arts, and social studies and to Texas…

  7. Income Tax Law: U.S. Armed Forces Training: Instructor Guide.

    Science.gov (United States)

    Internal Revenue Service (Dept. of Treasury), Washington, DC.

    The instructor's guide provides eight detailed lesson plans for instructing military personnel in the preparation of their U.S. Income Tax Returns. The plans cover the following subjects: requirements for filing returns of income and declaration of estimated tax; exemptions; gross income; exclusions and deductions to arrive at adjusted gross…

  8. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  9. Planning and Reviewing for Success. Training Guides for the Head Start Learning Community.

    Science.gov (United States)

    Aspen Systems Corp., Rockville, MD.

    This guide offers Head Start staff a blueprint for developing the skills and methods necessary for a Head Start program's planning and review process. The guide stresses the need for Head Start administrative and managerial leadership to maintain a holistic, integrated approach; use the strength and resources of Head Start team members; identify…

  10. Strategic Planning in Higher Education: A Guide for Leaders. Second Edition [with CD-ROM

    Science.gov (United States)

    Tromp, Sherrie A.; Ruben, Brent D.

    2010-01-01

    "Strategic Planning in Higher Education" unveils a comprehensive approach to planning that has proved successful at Rutgers University. The SPHE framework, developed by authors Tromp and Ruben, provides a blueprint for planning--a step-by-step approach that guides leaders on strategic thinking; helps them align organizational goals with…

  11. Facility effluent monitoring plan determinations for the 200 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-11-01

    The following facility effluent monitoring plan determinations document the evaluations conducted for the Westinghouse Hanford Company 200 Area facilities (chemical processing, waste management, 222-S Laboratory, and laundry) on the Hanford Site in south central Washington State. These evaluations determined the need for facility effluent monitoring plans for the 200 Area facilities. The facility effluent monitoring plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438 (WHC 1991). The Plutonium/Uranium Extraction Plant and UO 3 facility effluent monitoring plan determinations were prepared by Los Alamos Technical Associates, Richland, Washington. The Plutonium Finishing Plant, Transuranic Waste Storage and Assay Facility, T Plant, Tank Farms, Low Level Burial Grounds, and 222-S Laboratory determinations were prepared by Science Applications International Corporation of Richland, Washington. The B Plant Facility Effluent Monitoring Plan Determination was prepared by ERCE Environmental Services of Richland, Washington

  12. Preparation of guides, on mechanics of fluids, for the physics teaching based on the investigatory methodology

    Energy Technology Data Exchange (ETDEWEB)

    Munoz, Loreto Mora; Buzzo, Ricardo; Martinez-Mardones, Javier; Romero, Angel [Instituto de Fisica, Pontificia Universidad Catolica de Valparaiso Av. Brasil 2950, Valparaiso (Chile)], E-mail: jmartine@ucv.cl

    2008-11-01

    The challenges in the present educational reform emphasize the professional character of the teacher in the planning of classes, execution of activities and evaluation of learning. A set of planned activities is not to a class of science as a pile of thrown bricks is to a house; this is, that if it is not counted on the knowledge of the preconceptions of the students, the daily realities that they face and of the expectations that these have at the time of participating in the science classes, cannot be obtained the proposed objectives. The well-known investigatory method applied to the education of sciences approaches the conceptual contents from practical activities of easy reproduction that are guided in effective form towards the topics to teach. Guides OPPS (Operation Primary Physics Science), of Louisiana University, are excellent examples of the application of this methodology, as much in the material that corresponds to the students as in the material for the guide of the learning activities (call Leader of the class). This international experience, within the framework used of the Plans and Programs of the Ministry of Education of Chile (MINEDUC), is the main axis of this work in which the accomplishment of guides with this methodology considers, approaching contained of a unit of the common plan of physics for third grade of high school.

  13. Preparation of guides, on mechanics of fluids, for the physics teaching based on the investigatory methodology

    International Nuclear Information System (INIS)

    Munoz, Loreto Mora; Buzzo, Ricardo; Martinez-Mardones, Javier; Romero, Angel

    2008-01-01

    The challenges in the present educational reform emphasize the professional character of the teacher in the planning of classes, execution of activities and evaluation of learning. A set of planned activities is not to a class of science as a pile of thrown bricks is to a house; this is, that if it is not counted on the knowledge of the preconceptions of the students, the daily realities that they face and of the expectations that these have at the time of participating in the science classes, cannot be obtained the proposed objectives. The well-known investigatory method applied to the education of sciences approaches the conceptual contents from practical activities of easy reproduction that are guided in effective form towards the topics to teach. Guides OPPS (Operation Primary Physics Science), of Louisiana University, are excellent examples of the application of this methodology, as much in the material that corresponds to the students as in the material for the guide of the learning activities (call Leader of the class). This international experience, within the framework used of the Plans and Programs of the Ministry of Education of Chile (MINEDUC), is the main axis of this work in which the accomplishment of guides with this methodology considers, approaching contained of a unit of the common plan of physics for third grade of high school.

  14. 18F-Fdg-PET-guided Planning and Re-Planning (Adaptive) Radiotherapy in Head and Neck Cancer: Current State of Art.

    Science.gov (United States)

    Farina, Eleonora; Ferioli, Martina; Castellucci, Paolo; Farina, Arianna; Zanirato Rambaldi, Giuseppe; Cilla, Savino; Cammelli, Silvia; Fanti, Stefano; Morganti, Alessio G

    2017-12-01

    A review of the literature is proposed as a contribution to current knowledge on technical, physical, and clinical issues about PET-guided planning and re-planning radiotherapy (RT) in head and neck cancer. PubMed and Scopus electronic databases were searched for articles including clinical trials. Search terms were "gross tumor volume (GTV) delineation", "head and neck cancer", "radiotherapy", "adaptive radiotherapy" in combination with "PET". A 18 F-FDG-PET and CT-scan comparison in GTV definition for RT planning of head and neck cancer was shown in twenty-seven clinical trials with a total of 712 patients. Only two clinical trials focused on PET-guided adaptive radiotherapy (ART) with a total of 31 patients. 18 F-FDG-PET is able to achieve an accurate and precise definition of GTV boundaries during RT planning, especially in combination with CT-scan. ART strategies are proposed to evaluate tumor volume changes, plan boost irradiation on metabolically active residual neoplasm and protect organs at risk (OaRs). Copyright© 2017, International Institute of Anticancer Research (Dr. George J. Delinasios), All rights reserved.

  15. Guide to a Strategic Procurement Planning Approach on Regulated Commodity Markets

    Science.gov (United States)

    Seifert, Marcus; Wüst, Thorsten

    The access of Virtual Organizations to raw materials normally requires external resources. In many cases, the market for raw materials is regulated and the VO principles of trust, customer orientation etc. are not applicable. In consequence, the VO needs to provide reliable solutions for the customer while being dependent on the access to the required raw materials. The objective of the proposed paper is to present a guide to a strategic procurement planning for the manufacturing industry on regulated commodity markets. This guide can be used to evaluate specific sourcing options. The main goal of this guide is to identify the negative effects of market regulation at an early stage and reduce them by developing strategic alternatives. The successful application of this guide is demonstrated by the practical example of the refractory industry and one of their commodities, refractory grade bauxite.

  16. Functional image guided radiation therapy planning in volumetric modulated arc therapy for patients with malignant pleural mesothelioma

    Directory of Open Access Journals (Sweden)

    Yoshiko Doi, MD

    2017-04-01

    Conclusions: Significant reductions in fV5, fV10, fMLD, V5, and MLD were achieved with the functional image guided VMAT plan without negative effects on other factors. LAA-based functional image guided radiation therapy planning in VMAT is a feasible method to spare the functional lung in patients with MPM.

  17. PFP Interface identification and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  18. Alcatel-Lucent Service Routing Architect (SRA) self-study guide preparing for the BGP, VPRN and Multicast exams

    CERN Document Server

    Warnock, Glenn; Shaheen, Ghassan

    2015-01-01

    A comprehensive resource for professionals preparing for Alcatel-Lucent Service Routing Architect (SRA) certification Networking professionals are taking note of Alcatel-Lucent and its quick ascent in the networking and telecom industries. IP networking professionals looking for a comprehensive guide to obtaining the Alcatel-Lucent Service Routing Architect (SRA) certification will be pleased to learn of this new publication, Alcatel-Lucent Service Routing Architect (SRA) Self-Study Guide: Preparing for the BGP, VPRN and Multicast Exams. The book comprises approximately 2,600 pages of print a

  19. Facility effluent monitoring plan for the tank farm facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.

    1998-05-18

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  20. Evaluation of an artificial intelligence guided inverse planning system: Clinical case study

    International Nuclear Information System (INIS)

    Yan Hui; Yin Fangfang; Willett, Christopher

    2007-01-01

    Purpose: An artificial intelligence (AI) guided method for parameter adjustment of inverse planning was implemented on a commercial inverse treatment planning system. For evaluation purpose, four typical clinical cases were tested and the results from both plans achieved by automated and manual methods were compared. Methods and materials: The procedure of parameter adjustment mainly consists of three major loops. Each loop is in charge of modifying parameters of one category, which is carried out by a specially customized fuzzy inference system. A physician prescribed multiple constraints for a selected volume were adopted to account for the tradeoff between prescription dose to the PTV and dose-volume constraints for critical organs. The searching process for an optimal parameter combination began with the first constraint, and proceeds to the next until a plan with acceptable dose was achieved. The initial setup of the plan parameters was the same for each case and was adjusted independently by both manual and automated methods. After the parameters of one category were updated, the intensity maps of all fields were re-optimized and the plan dose was subsequently re-calculated. When final plan arrived, the dose statistics were calculated from both plans and compared. Results: For planned target volume (PTV), the dose for 95% volume is up to 10% higher in plans using the automated method than those using the manual method. For critical organs, an average decrease of the plan dose was achieved. However, the automated method cannot improve the plan dose for some critical organs due to limitations of the inference rules currently employed. For normal tissue, there was no significant difference between plan doses achieved by either automated or manual method. Conclusion: With the application of AI-guided method, the basic parameter adjustment task can be accomplished automatically and a comparable plan dose was achieved in comparison with that achieved by the manual

  1. Evaluation of an artificial intelligence guided inverse planning system: clinical case study.

    Science.gov (United States)

    Yan, Hui; Yin, Fang-Fang; Willett, Christopher

    2007-04-01

    An artificial intelligence (AI) guided method for parameter adjustment of inverse planning was implemented on a commercial inverse treatment planning system. For evaluation purpose, four typical clinical cases were tested and the results from both plans achieved by automated and manual methods were compared. The procedure of parameter adjustment mainly consists of three major loops. Each loop is in charge of modifying parameters of one category, which is carried out by a specially customized fuzzy inference system. A physician prescribed multiple constraints for a selected volume were adopted to account for the tradeoff between prescription dose to the PTV and dose-volume constraints for critical organs. The searching process for an optimal parameter combination began with the first constraint, and proceeds to the next until a plan with acceptable dose was achieved. The initial setup of the plan parameters was the same for each case and was adjusted independently by both manual and automated methods. After the parameters of one category were updated, the intensity maps of all fields were re-optimized and the plan dose was subsequently re-calculated. When final plan arrived, the dose statistics were calculated from both plans and compared. For planned target volume (PTV), the dose for 95% volume is up to 10% higher in plans using the automated method than those using the manual method. For critical organs, an average decrease of the plan dose was achieved. However, the automated method cannot improve the plan dose for some critical organs due to limitations of the inference rules currently employed. For normal tissue, there was no significant difference between plan doses achieved by either automated or manual method. With the application of AI-guided method, the basic parameter adjustment task can be accomplished automatically and a comparable plan dose was achieved in comparison with that achieved by the manual method. Future improvements to incorporate case

  2. A Guide for Planning Facilities for Occupational Preparation Programs in Metallurgy Technology. Interim Report. Research 28.

    Science.gov (United States)

    German, Carl, Jr.

    The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…

  3. School Health Index: A Self-Assessment and Planning Guide. Middle School/High School.

    Science.gov (United States)

    Barrios, Lisa C.; Burgeson, Charlene R.; Crossett, Linda; Harrykissoon, Samantha D.; Pritzl, Jane; Wechsler, Howell; Kuester, Sarah A.; Pederson, Linda; Graffunder, Corinne; Rainford, Neil; Sleet, David

    2004-01-01

    The "School Health Index" is a self-assessment and planning guide that will enable schools to: (1) identify the strengths and weaknesses of school policies and programs for promoting health and safety; (2) develop an action plan for improving student health and safety, and (3) involve teachers, parents, students, and the community in improving…

  4. Mental fatigue and task control : Planning and preparation

    NARCIS (Netherlands)

    Lorist, MM; Klein, Martin; Nieuwenhuis, S; De Jong, R; Mulder, G; Meijman, TF

    The effects of mental fatigue on planning and preparation for future actions were examined, using a task switching paradigm. Fatigue was induced by "time on task," with subjects performing a switch task continuously for 2 hr. Subjects had to alternate between tasks on every second trial, so that a

  5. Food Preparation. I: Food Facts for Home. II: Facts about Foodservice.

    Science.gov (United States)

    Procter and Gamble Educational Services, Cincinnati, OH.

    This package is intended for use in home economics classes focusing on nutrition and food preparation and service. The teaching guide is divided into two parts. The first centers on selected first-time facts on nutrition, meal planning, and basic food preparation skills. It includes modules on nutrition, meal management, initial steps in food…

  6. Facility effluent monitoring plan for 242-A Evaporator facility

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.

    1993-03-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility effluent Monitoring Plans, WHC-EP-0438-1**. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  7. Crash Injury Management for Traffic Law Enforcement Officers; Emergency Medical Services; Course Guide.

    Science.gov (United States)

    Cleven, Arlene M.

    The course guide has been prepared to aid in planning and conducting a training program in emergency medical care for first responders to traffic accidents (expected to be patrolling law enforcement officers). This document contains a detailed description of the training program; suggestions for course planning including class size, scheduling…

  8. Dosimetric Comparison of Real-Time MRI-Guided Tri-Cobalt-60 Versus Linear Accelerator-Based Stereotactic Body Radiation Therapy Lung Cancer Plans.

    Science.gov (United States)

    Wojcieszynski, Andrzej P; Hill, Patrick M; Rosenberg, Stephen A; Hullett, Craig R; Labby, Zacariah E; Paliwal, Bhudatt; Geurts, Mark W; Bayliss, R Adam; Bayouth, John E; Harari, Paul M; Bassetti, Michael F; Baschnagel, Andrew M

    2017-06-01

    Magnetic resonance imaging-guided radiation therapy has entered clinical practice at several major treatment centers. Treatment of early-stage non-small cell lung cancer with stereotactic body radiation therapy is one potential application of this modality, as some form of respiratory motion management is important to address. We hypothesize that magnetic resonance imaging-guided tri-cobalt-60 radiation therapy can be used to generate clinically acceptable stereotactic body radiation therapy treatment plans. Here, we report on a dosimetric comparison between magnetic resonance imaging-guided radiation therapy plans and internal target volume-based plans utilizing volumetric-modulated arc therapy. Ten patients with early-stage non-small cell lung cancer who underwent radiation therapy planning and treatment were studied. Following 4-dimensional computed tomography, patient images were used to generate clinically deliverable plans. For volumetric-modulated arc therapy plans, the planning tumor volume was defined as an internal target volume + 0.5 cm. For magnetic resonance imaging-guided plans, a single mid-inspiratory cycle was used to define a gross tumor volume, then expanded 0.3 cm to the planning tumor volume. Treatment plan parameters were compared. Planning tumor volumes trended larger for volumetric-modulated arc therapy-based plans, with a mean planning tumor volume of 47.4 mL versus 24.8 mL for magnetic resonance imaging-guided plans ( P = .08). Clinically acceptable plans were achievable via both methods, with bilateral lung V20, 3.9% versus 4.8% ( P = .62). The volume of chest wall receiving greater than 30 Gy was also similar, 22.1 versus 19.8 mL ( P = .78), as were all other parameters commonly used for lung stereotactic body radiation therapy. The ratio of the 50% isodose volume to planning tumor volume was lower in volumetric-modulated arc therapy plans, 4.19 versus 10.0 ( P guided tri-cobalt-60 radiation therapy is capable of delivering lung high

  9. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    Science.gov (United States)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  10. 76 FR 48881 - Recovery Plan for the Endangered Pyne's Ground-plum (Astragalus bibullatus

    Science.gov (United States)

    2011-08-09

    ... plan by contacting the Tennessee Field Office, U.S. Fish and Wildlife Service, 446 Neal Street... implementing approved recovery plans. Restoring an endangered or threatened animal or plant to the point where... species program. To help guide the recovery effort, we are preparing recovery plans for most listed...

  11. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Science.gov (United States)

    2013-06-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKF030.16100000.DO0000.LXSILCYK0000] Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska and... management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook, Appendix C...

  12. Planning for prescribed burning in the inland northwest.

    Science.gov (United States)

    Robert E. Martin; John D. Dell

    1978-01-01

    Fire has historically played a role in forests and ranges of the inland Northwest. This guide has been prepared to help managers understand the role of fire and the potential uses of fire and to plan for fire use in managing these lands. Sections deal with these topics, and steps in planning a prescribed burn are outlined. A sample burning situation illustrates the...

  13. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Geiger, J.L.

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified. in. A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  14. Special Education Program Evaluation: A Planning Guide. An Overview. CASE Commissioned Series.

    Science.gov (United States)

    McLaughlin, John A.

    This resource guide is intended to help in planning special education program evaluations. It focuses on: basic evaluation concepts, identification of special education decision makers and their information needs, specific evaluation questions, procedures for gathering relevant information, and evaluation of the evaluation process itself.…

  15. Optimization of Gamma Knife treatment planning via guided evolutionary simulated annealing

    International Nuclear Information System (INIS)

    Zhang Pengpeng; Dean, David; Metzger, Andrew; Sibata, Claudio

    2001-01-01

    We present a method for generating optimized Gamma Knife trade mark sign (Elekta, Stockholm, Sweden) radiosurgery treatment plans. This semiautomatic method produces a highly conformal shot packing plan for the irradiation of an intracranial tumor. We simulate optimal treatment planning criteria with a probability function that is linked to every voxel in a volumetric (MR or CT) region of interest. This sigmoidal P + parameter models the requirement of conformality (i.e., tumor ablation and normal tissue sparing). After determination of initial radiosurgery treatment parameters, a guided evolutionary simulated annealing (GESA) algorithm is used to find the optimal size, position, and weight for each shot. The three-dimensional GESA algorithm searches the shot parameter space more thoroughly than is possible during manual shot packing and provides one plan that is suitable to the treatment criteria of the attending neurosurgeon and radiation oncologist. The result is a more conformal plan, which also reduces redundancy, and saves treatment administration time

  16. Complex Osteotomies of Tibial Plateau Malunions Using Computer-Assisted Planning and Patient-Specific Surgical Guides.

    Science.gov (United States)

    Fürnstahl, Philipp; Vlachopoulos, Lazaros; Schweizer, Andreas; Fucentese, Sandro F; Koch, Peter P

    2015-08-01

    The accurate reduction of tibial plateau malunions can be challenging without guidance. In this work, we report on a novel technique that combines 3-dimensional computer-assisted planning with patient-specific surgical guides for improving reliability and accuracy of complex intraarticular corrective osteotomies. Preoperative planning based on 3-dimensional bone models was performed to simulate fragment mobilization and reduction in 3 cases. Surgical implementation of the preoperative plan using patient-specific cutting and reduction guides was evaluated; benefits and limitations of the approach were identified and discussed. The preliminary results are encouraging and show that complex, intraarticular corrective osteotomies can be accurately performed with this technique. For selective patients with complex malunions around the tibia plateau, this method might be an attractive option, with the potential to facilitate achieving the most accurate correction possible.

  17. PFP Interface identification and management planning guide; TOPICAL

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  18. Graduate School and You: A Guide for Prospective Graduate Students.

    Science.gov (United States)

    Kidwell, Clara Sue; LaPidus, Jules B.

    This pamphlet guides the college graduate in determining whether graduate school is an appropriate choice in career planning. Chapter titles include: "Why Graduate School?,""What is Graduate Education?,""Preparation for Graduate School,""Career Options with a Graduate Degree,""Making the Decision,""Financing a Graduate Education,""Choosing a…

  19. [Planning by service organisation priorities. The process of preparing strategic service-organisation plans].

    Science.gov (United States)

    Sampietro-Colom, Laura; Costa, Dolors; Busqué, Anna; Lacasa, Carme

    2008-12-01

    Strategic planning designs the general setting and the strategic principles of a healthcare system, as well as the general guidelines that govern the development of a health system. Strategic service-organisation plans deal with translating healthcare policies into service policies and respond, principally, to the need for services; these give rise to problems that require a solution. They are developed in line with advances in scientific knowledge, the implementation and current characteristics of the healthcare services and the evolution in the competences of professional teams. There are five stages for their development: identification of health/service requirements; prioritisation of needs in health/services; definition of and agreement on service organisation models (care model and service portfolio); the preparation of and agreement on territorial action plans; introduction and evaluation. A conceptual framework is presented along with practical applications carried out in Catalonia.

  20. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  1. Engaging Students in Career Planning and Preparation through Ementoring

    Science.gov (United States)

    Kinkel, Doreen H.

    2011-01-01

    Following a developmental model of career planning and preparation, an ementoring program was devised for first semester freshmen to (1) heighten career awareness and stimulate career exploration in food and agricultural sciences; (2) expand interest and willingness to follow career opportunities beyond the regional geographic area; and (3)…

  2. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Science.gov (United States)

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  3. Visual Sample Plan Version 7.0 User's Guide

    Energy Technology Data Exchange (ETDEWEB)

    Matzke, Brett D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Newburn, Lisa LN [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hathaway, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bramer, Lisa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilson, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Dowson, Scott T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sego, Landon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pulsipher, Brent A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-03-01

    User's guide for VSP 7.0 This user's guide describes Visual Sample Plan (VSP) Version 7.0 and provides instructions for using the software. VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 7.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sites suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (XP, Vista, Windows 7, and Windows 8). Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem/rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for unexploded ordnance (UXO) identification.

  4. System i Disaster Recovery Planning

    CERN Document Server

    Dolewski, Richard

    2008-01-01

    Mapping out all the preparations necessary for an effective disaster recovery plan and its safeguard-a continuous maintenance program-this guide is aimed at IT managers of small and medium businesses. The opening section covers the initial steps of auditing vulnerability, ranking essential IT functions, and reviewing the storage of tape backups, with the following discussion focused on the elements of the plan itself. The plan includes a mission statement, a definition of disaster, the assignment of staff to teams, methods of compensating for human error, and standards for documenting the step

  5. PET/CT-guided interventional procedures: rationale, justification, initial study, and research plan

    Energy Technology Data Exchange (ETDEWEB)

    Wong, K.; Rahill, J.; Cleary, K. [Computer Aided Interventions and Medical Robotics (CAIMR), Imaging Science and Information Systems (ISIS) Center, Georgetown Univ. Medical Center, Washington, DC (United States); Petrillo, S.; Earl-Graef, D. [Dept. of Radiology, Georgetown Univ. Hospital, MedStar Health, Washington, DC (United States); Banovac, F.; Levy, E. [Computer Aided Interventions and Medical Robotics (CAIMR), Imaging Science and Information Systems (ISIS) Center, Georgetown Univ. Medical Center, Washington, DC (United States); Dept. of Radiology, Georgetown Univ. Hospital, MedStar Health, Washington, DC (United States); Shekhar, R. [Dept. of Radiology, Univ. of Maryland Medical Center, Baltimore, MD (United States)

    2007-06-15

    Positron-emission tomography (PET) and PET/CT (computed tomography) are becoming increasingly important for diagnosis and treatment of cancer. Clinically relevant changes can sometimes be seen on PET that are not seen on other imaging modalities. However, PET is not suitable for guiding biopsy as the images are not obtained in real-time. Therefore, our research group has begun developing a concept for PET/CT-guided interventional procedures. This paper presents the rationale for this concept, outlines our research plan, and includes an initial study to evaluate the relative sensitivity of CT and PET/CT in detecting suspicious lesions. (orig.)

  6. [Attitudes and habits of Canadians in relation to planning and preparing meals at home].

    Science.gov (United States)

    Aubé, Julie; Marquis, Marie

    2011-01-01

    To describe the attitudes and habits of Canadians in relation to planning and preparing meals at home, in order to identify motivations that can be used to promote home cooking. An electronic survey consisting of 39 multiple-choice questions was posted on the Dietitians of Canada website between November 16 and December 22, 2006. The statements analyzed have to do with perceived benefits associated with home cooking, obstacles preventing people from cooking, preparation time and meal planning, learning to cook, and sources of recipe ideas. A total of 4,080 people filled out the questionnaire. Although they believe that home cooking can improve diet quality and eating behaviours, respondents experience several obstacles relating to day-to-day food preparation. Among these are lack of time, energy, ideas, and planning. This study underlines the relevance of creating strategies not only for educating consumers about the benefits of home cooking, but also for providing practical information to help them overcome obstacles limiting the day-to-day preparation of food.

  7. A guide for developing an ADP security plan for Navy Finance Center, Cleveland, Ohio

    OpenAIRE

    Barber, Daniel E.; Hodnett, Elwood Thomas, Jr.

    1982-01-01

    Approved for public release; distribution is unlimited This paper is intended to be used as a guide by personnel at the Navy Finance Center (NFC) Cleveland, Ohio in developing an Automatic Data Processing (ADP) Security Plan. An effort has been made to combine the requirements for an ADP security plan established by OPNAVINST5239.1A with pertinent information from other selected readings. The importance of the devotion of personnel, time and funds to ADP security planning has been emphas...

  8. PFP issues/assumptions development and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Issues/Assumptions Development and Management Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of an Issues/Assumptions Management List for the Plutonium Finishing Plant (PFP) integrated project baseline. Revisions to this document will include, as attachments, the most recent version of the Issues/Assumptions Management List, both open and current issues/assumptions (Appendix A), and closed or historical issues/assumptions (Appendix B). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Revisions that suggest improved processes will only require PFP management approval

  9. Impact of field number and beam angle on functional image-guided lung cancer radiotherapy planning

    Science.gov (United States)

    Tahir, Bilal A.; Bragg, Chris M.; Wild, Jim M.; Swinscoe, James A.; Lawless, Sarah E.; Hart, Kerry A.; Hatton, Matthew Q.; Ireland, Rob H.

    2017-09-01

    To investigate the effect of beam angles and field number on functionally-guided intensity modulated radiotherapy (IMRT) normal lung avoidance treatment plans that incorporate hyperpolarised helium-3 magnetic resonance imaging (3He MRI) ventilation data. Eight non-small cell lung cancer patients had pre-treatment 3He MRI that was registered to inspiration breath-hold radiotherapy planning computed tomography. IMRT plans that minimised the volume of total lung receiving  ⩾20 Gy (V20) were compared with plans that minimised 3He MRI defined functional lung receiving  ⩾20 Gy (fV20). Coplanar IMRT plans using 5-field manually optimised beam angles and 9-field equidistant plans were also evaluated. For each pair of plans, the Wilcoxon signed ranks test was used to compare fV20 and the percentage of planning target volume (PTV) receiving 90% of the prescription dose (PTV90). Incorporation of 3He MRI led to median reductions in fV20 of 1.3% (range: 0.2-9.3% p  =  0.04) and 0.2% (range: 0 to 4.1%; p  =  0.012) for 5- and 9-field arrangements, respectively. There was no clinically significant difference in target coverage. Functionally-guided IMRT plans incorporating hyperpolarised 3He MRI information can reduce the dose received by ventilated lung without comprising PTV coverage. The effect was greater for optimised beam angles rather than uniformly spaced fields.

  10. University Strategic Planning: A Process for Change in a Principal Preparation Program

    Science.gov (United States)

    Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma

    2017-01-01

    This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…

  11. The relationship of lateral anatomic structures to exiting guide pins during femoral tunnel preparation utilizing an accessory medial portal.

    Science.gov (United States)

    Farrow, Lutul D; Parker, Richard D

    2010-06-01

    Anatomic reconstruction of the anterior cruciate ligament through an accessory medial portal has become increasingly popular. The purpose of this study is to describe the relationship of guide pin exit points to the lateral anatomic structures when preparing the anterior cruciate ligament femoral tunnel through an accessory medial portal. We utilized seven fresh frozen cadaveric knees. Utilizing an anteromedial approach, a guide wire was placed into the center of each bundle's footprint. Each guide wire was advanced through the lateral femoral cortex. The guide pins were passed at 90, 110, and 130 degrees of knee flexion. The distances from each guide pin to the closest relevant structures on the lateral side of the knee were measured. At 90 degrees the posterolateral bundle guide pin was closest to the lateral condyle articular cartilage (mean 5.4 +/- 2.2 mm) and gastrocnemius tendon (mean 5.7 +/- 2.1 mm). At 110 degrees the posterolateral bundle pin was closest to the gastrocnemius tendon (mean 4.5 +/- 3.4 mm). At 130 degrees the posterolateral bundle pin was closest to the gastrocnemius tendon (mean 7.2 +/- 5.5 mm) and lateral collateral ligament (mean 6.8 +/- 2.1 mm). At 90 degrees the anteromedial bundle guide pin was closest to the articular cartilage (mean 2.0 +/- 2.0 mm). At 110 degrees the anteromedial bundle pin was closest to the articular cartilage (mean 7.4 +/- 3.5 mm) and gastrocnemius tendon (mean 12.3 +/- 3.1 mm). At 130 degrees the AM bundle pin was closest to the gastrocnemius tendon (mean 8.2 +/- 3.2 mm) and LCL (mean 15.1 +/- 2.9 mm). Neither guide pin (anteromedial or posterolateral bundle) put the peroneal nerve at risk at any knee flexion angle. At low knee flexion angles the anteromedial and posterolateral bundle guide pins closely approximated multiple lateral structures when using an accessory medial arthroscopic portal. Utilizing higher flexion angles increases the margin of error when preparing both femoral tunnels. During preparation of

  12. Primary pre-service teachers' skills in planning a guided scientific inquiry

    Science.gov (United States)

    García-Carmona, Antonio; Criado, Ana M.; Cruz-Guzmán, Marta

    2017-10-01

    A study is presented of the skills that primary pre-service teachers (PPTs) have in completing the planning of a scientific inquiry on the basis of a guiding script. The sample comprised 66 PPTs who constituted a group-class of the subject Science Teaching, taught in the second year of an undergraduate degree in primary education at a Spanish university. The data was acquired from the responses of the PPTs (working in teams) to open-ended questions posed to them in the script concerning the various tasks involved in a scientific inquiry (formulation of hypotheses, design of the experiment, data collection, interpretation of results, drawing conclusions). Data were analyzed within the framework of a descriptive-interpretive qualitative research study with a combination of inter- and intra-rater methods, and the use of low-inference descriptors. The results showed that the PPTs have major shortcomings in planning the complete development of a guided scientific inquiry. The discussion of the results includes a number of implications for rethinking the Science Teaching course so that PPTs can attain a basic level of training in inquiry-based science education.

  13. Standard Practice for Preparation of Aerospace Contamination Control Plans

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP): 1.1.1 Cleanliness requirements for deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations. 1.1.2 Implementation plans to achieve, verify, and maintain the specified cleanliness re...

  14. Facility effluent monitoring plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Lavey, G.H.

    1992-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438**. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  15. Emergency response planning and preparedness for transport accidents involving radioactive material

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this Guide is to provide assistance to public authorities and others (including consignors and carriers of radioactive materials) who are responsible for ensuring safety in establishing and developing emergency response arrangements for responding effectively to transport accidents involving radioactive materials. This Guide is concerned mainly with the preparation of emergency response plans. It provides information which will assist those countries whose involvement with radioactive materials is just beginning and those which have already developed their industries involving radioactive materials and attendant emergency plans, but may need to review and improve these plans. The need for emergency response plans and the ways in which they are implemented vary from country to country. In each country, the responsible authorities must decide how best to apply this Guide, taking into account the actual shipments and associated hazards. In this Guide the emergency response planning and response philosophy are outlined, including identification of emergency response organizations and emergency services that would be required during a transport accident. General consequences which could prevail during an accident are described taking into account the IAEA Regulations for the Safe Transport of Radioactive Material. 43 refs, figs and tabs

  16. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  17. The Here, Now and Tomorrow of Cable Television in Education; A Planning Guide.

    Science.gov (United States)

    Massachusetts Advisory Council on Education, Boston.

    In order for the potential of cable television to be applied for educational benefit, educators must effectively communicate their priorities and needs to both licensing authorities and cable companies. This guide familiarizes educators and school committees with their options and prepares them to take part in local franchise negotiations. It…

  18. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  19. Multicentre treatment planning study of MRI-guided brachytherapy for cervical cancer: Comparison between tandem-ovoid applicator users

    International Nuclear Information System (INIS)

    Nomden, Christel N.; Leeuw, Astrid A.C. de; Van Limbergen, Erik; Brabandere, Marisol de; Nulens, An; Nout, Remi A.; Laman, Mirjam; Ketelaars, Martijn; Lutgens, Ludovicus; Reniers, Brigitte; Jürgenliemk-Schulz, Ina Maria

    2013-01-01

    Background and purpose: To compare MRI-guided treatment planning approaches between four centres that use tandem-ovoid applicators. Material and methods: Four centres generated three treatment plans for four patients: standard, optimised intracavitary, and optimised intracavitary/interstitial. Prescribed D90 High-Risk CTV (HR-CTV) was 85 Gy EQD2 (external-beam radiotherapy and brachytherapy), while the D 2cc OAR limit was 90 Gy EQD2 for bladder and 75 Gy EQD2 for rectum, sigmoid, and bowel, respectively. DVH-parameters, source loading patterns and spatial dose distributions of the three treatment plans were compared. Results: The standard plans of the different centres were comparable with respect to the D90 HR-CTV, but differed in OAR doses. MRI-guided intracavitary optimisation resulted in organ sparing and smaller variation in DVH parameters between the centres. Adding interstitial needles led to target dose escalation while respecting the OAR constraints. However, substantial differences in relative weights of the applicator parts resulted in an increased variation in DVH parameters and locations of high dose regions. Conclusions: MRI-guided brachytherapy treatment planning optimisation provides the possibility to increase the dose to the HR-CTV and spare the OARs. Depending on the degree of conformity the centres make different choices in relative weighting of applicator parts, leading to different dose distributions

  20. [Powdered infant formulae preparation guide for hospitals based on Hazard Analysis and Critical Control Points (HACCP) principles].

    Science.gov (United States)

    Vargas-Leguás, H; Rodríguez Garrido, V; Lorite Cuenca, R; Pérez-Portabella, C; Redecillas Ferreiro, S; Campins Martí, M

    2009-06-01

    This guide for the preparation of powdered infant formulae in hospital environments is a collaborative work between several hospital services and is based on national and European regulations, international experts meetings and the recommendations of scientific societies. This guide also uses the Hazard Analysis and Critical Control Point principles proposed by Codex Alimentarius and emphasises effective verifying measures, microbiological controls of the process and the corrective actions when monitoring indicates that a critical control point is not under control. It is a dynamic guide and specifies the evaluation procedures that allow it to be constantly adapted.

  1. Being Prepared for Climate Change: Checklists of Potential Climate Change Risks, from Step 3

    Science.gov (United States)

    The Being Prepared for Climate Change workbook is a guide for constructing a climate change adaptation plan based on identifying risks and their consequences. These checklists (from Step 3 of the workbook) help users identify risks.

  2. USE OF PLASTIC MATERIAL AND TRIPLE SCAN IN THE PREPARATION OF SURGICAL GUIDES FOR THE DENTAL IMPLANT TREATMENT-CASE REPORT

    Directory of Open Access Journals (Sweden)

    Rosen Borisov

    2016-09-01

    Full Text Available The use of surgical guides in implant treatment increases the accuracy of the dental implant positioning compared with manual methods. Regardless of how they are made, deviations of implants from their intended position are established in all kinds of surgical guides. This article considers the use of plastic material and new scanning technique for the production of CAD/CAM surgical guides that aim to overcome the deficiencies of the currently applied technologies in the production of surgical guides. Materials and methods: The study shows the techniques used to overcome degraded by metal artifacts CBCT images in implant treatment of patients with partial edentulism, and located medially to the defect metal-ceramic crowns. When planning implant treatment, a triple scan method has been implied. At the beginning, CBCT scan of the patient with a silicone impression material is made in the zone of interest. Secondly, CBCT scan only of the silicon impression is made, and thirdly - intraoral scanning of the patient with an intraoral scanner. Virtual analogues have been created of images from the three scans and have been repositioned one over another; as thereby an intraoral image have been accurately positioned over the CBCT image of the patient. Virtual planning of the implant positioning has been performed, and a model of surgical guide has been made for their placement. The guide has been printed with an SLA 3D printer technology of photopolymer with dualistic characteristics-rigid in the working part and plastic in the fixing part. Through it, implants have been placed to the treatment planning. Postoperative CBCT has been done on the patient to measure the implant deviation to their position in the treatment planning. Results: Axes angular deviation of the planned and placed implants has not been established. Average linear displacement of 240 μ (+/- 40 μ has been found. Conclusions: Using the triple scan method is possible to overcome the

  3. Library Spaces for 21st-Century Learners: A Planning Guide for Creating New School Library Concepts

    Science.gov (United States)

    Sullivan, Margaret

    2013-01-01

    "Library Spaces for 21st-Century Learners: A Planning Guide for Creating New School Library Concepts" focuses on planning contemporary school library spaces with user-based design strategies. The book walks school librarians and administrators through the process of gathering information from students and other stakeholders involved in…

  4. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORE00000 L63500000.DO0000.LXSS021H0000.HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  5. The emergency plan implementing procedures for HANARO facility

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Tai; Khang, Byung Oui; Lee, Goan Yup; Lee, Moon [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    The radiological emergency plan implementing procedures of HANARO (High-flux Advanced Neutron Application Reactor) facility is prepared based on the Korea Atomic Law, the Civil Defence Law, Disaster Protection Law and the emergency related regulatory guides such as Guidance for Evolution of Radiation Emergency Plans in Nuclear Research Facilities (KAERI/TR-956/98, Feb.1998) and the emergency plan of HANARO. These procedures is also prepared to ensure adequate response activities to the rediological events which would cause a significant risk to the KAERI staffs and the public nea to the site. Periodic trainning and exercise for the reactor operators and emergency staffs will reduce accident risks and the release of radioactivities to the environment. 61 refs., 81 tabs. (Author)

  6. Hanford site guide for preparing and maintaining generator group pollution prevention program documentation

    International Nuclear Information System (INIS)

    1995-12-01

    This manual provides the necessary guidance to contractor generator groups for developing and maintaining documentation of their pollution prevention (P2) program activities. Preparation of program documentation will demonstrate compliance with contractor and U.S. Department of Energy (DOE) requirements, as well as state and federal regulations. Contractor waste generator groups are no longer required to prepare and update facility waste minimization plans. Developing and maintaining program documentation replace this requirement

  7. Reliability of implant placement after virtual planning of implant positions using cone beam CT data and surgical (guide) templates.

    Science.gov (United States)

    Nickenig, Hans-Joachim; Eitner, Stephan

    2007-01-01

    We assessed the reliability of implant placement after virtual planning of implant positions using cone-beam CT data and surgical guide templates. A total of 102 patients (250 implants, 55.4% mandibular; mean patient age, 40.4 years) who had undergone implant treatment therapy in an armed forces dental clinic (Cologne, Germany) between July 1, 2005 and December 1, 2005. They were treated with a system that allows transfer of virtual planning to surgical guide templates. Only in eight cases the surgical guides were not used because a delayed implant placement was necessary. In four posterior mandibular cases, handling was limited because of reduced interocclusal distance, requiring 50% shortening of the drill guides. The predictability of implant size was high: only one implant was changed to a smaller diameter (because of insufficient bone). In all cases, critical anatomical structures were protected and no complications were detected in postoperative panoramic radiographs. In 58.1% (147) of the 250 implants, a flapless surgery plan was realized. Implant placement after virtual planning of implant positions using cone beam CT data and surgical templates can be reliable for preoperative assessment of implant size, position, and anatomical complications. It is also indicative of cases amenable to flapless surgery.

  8. Teacher Performance Evaluation Plan: A Personalized Approach to Supervision, Staff Development, and Evaluation. An Implementation Guide. Revised Edition.

    Science.gov (United States)

    Knight, Jeanne; And Others

    This guide provides assistance to New Mexico school districts in implementing a state-sponsored teacher performance evaluation plan (Provision III of the New Mexico Staff Accountability Plan, adopted by the State Board of Education). This plan involves five basic procedures: (1) determine specific definitions of the six essential teaching…

  9. 77 FR 71824 - Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an...

    Science.gov (United States)

    2012-12-04

    ... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...

  10. Business Planning for Cultural Heritage Institutions. A Framework and Resource Guide to Assist Cultural Heritage Institutions with Business Planning for Sustainability of Digital Asset Management Programs

    Science.gov (United States)

    Bishoff, Liz; Allen, Nancy

    2004-01-01

    The purpose of this document is to present a framework and resource guide to help cultural heritage institutions plan sustainable access to their digital cultural assets and to do so by means that link their missions to planning modes and models. To aid cultural heritage organizations in the business-planning process, this resource will do the…

  11. Self-guided training for deep brain stimulation planning using objective assessment.

    Science.gov (United States)

    Holden, Matthew S; Zhao, Yulong; Haegelen, Claire; Essert, Caroline; Fernandez-Vidal, Sara; Bardinet, Eric; Ungi, Tamas; Fichtinger, Gabor; Jannin, Pierre

    2018-04-04

    Deep brain stimulation (DBS) is an increasingly common treatment for neurodegenerative diseases. Neurosurgeons must have thorough procedural, anatomical, and functional knowledge to plan electrode trajectories and thus ensure treatment efficacy and patient safety. Developing this knowledge requires extensive training. We propose a training approach with objective assessment of neurosurgeon proficiency in DBS planning. To assess proficiency, we propose analyzing both the viability of the planned trajectory and the manner in which the operator arrived at the trajectory. To improve understanding, we suggest a self-guided training course for DBS planning using real-time feedback. To validate the proposed measures of proficiency and training course, two experts and six novices followed the training course, and we monitored their proficiency measures throughout. At baseline, experts planned higher quality trajectories and did so more efficiently. As novices progressed through the training course, their proficiency measures increased significantly, trending toward expert measures. We developed and validated measures which reliably discriminate proficiency levels. These measures are integrated into a training course, which quantitatively improves trainee performance. The proposed training course can be used to improve trainees' proficiency, and the quantitative measures allow trainees' progress to be monitored.

  12. Abnormal externally guided movement preparation in recent-onset schizophrenia is associated with impaired selective attention to external input.

    Science.gov (United States)

    Smid, Henderikus G O M; Westenbroek, Joanna M; Bruggeman, Richard; Knegtering, Henderikus; Van den Bosch, Robert J

    2009-11-30

    Several theories propose that the primary cognitive impairment in schizophrenia concerns a deficit in the processing of external input information. There is also evidence, however, for impaired motor preparation in schizophrenia. This provokes the question whether the impaired motor preparation in schizophrenia is a secondary consequence of disturbed (selective) processing of the input needed for that preparation, or an independent primary deficit. The aim of the present study was to discriminate between these hypotheses, by investigating externally guided movement preparation in relation to selective stimulus processing. The sample comprised 16 recent-onset schizophrenia patients and 16 controls who performed a movement-precuing task. In this task, a precue delivered information about one, two or no parameters of a movement summoned by a subsequent stimulus. Performance measures and measures derived from the electroencephalogram showed that patients yielded smaller benefits from the precues and showed less cue-based preparatory activity in advance of the imperative stimulus than the controls, suggesting a response preparation deficit. However, patients also showed less activity reflecting selective attention to the precue. We therefore conclude that the existing evidence for an impairment of externally guided motor preparation in schizophrenia is most likely due to a deficit in selective attention to the external input, which lends support to theories proposing that the primary cognitive deficit in schizophrenia concerns the processing of input information.

  13. Event planning the ultimate guide to successful meetings, corporate events, fundraising galas, conferences, conventions, incentives and other special events

    CERN Document Server

    Allen, Judy

    2009-01-01

    This bestselling all–in–one guide to the event planning business is back and better than ever, fully updated and revised to reflect the very latest trends and best practices in the industry. This handy, comprehensive guide includes forms, checklists, and tips for managing events, as well as examples and case studies of both successful and unsuccessful events. Judy Allen (Toronto, ON, Canada) is founder and President of Judy Allen Productions, a full–service event planning production company.

  14. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  15. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    Science.gov (United States)

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  16. Medical planning and response for a nuclear detonation: a practical guide.

    Science.gov (United States)

    Coleman, C Norman; Adams, Steven; Adrianopoli, Carl; Ansari, Armin; Bader, Judith L; Buddemeier, Brooke; Caro, J Jaime; Casagrande, Rocco; Case, Cullen; Caspary, Kevin; Chang, Arthur S; Chang, H Florence; Chao, Nelson; Cliffer, Kenneth D; Confer, Dennis; Deitchman, Scott; Derenzo, Evan G; Dobbs, Allen; Dodgen, Daniel; Donnelly, Elizabeth H; Gorman, Susan; Grace, Marcy Beth; Hatchett, Richard; Hick, John L; Hrdina, Chad; Jones, Robert; Kane, Elleen; Knebel, Ann; Koerner, John F; Laffan, Alison M; Larson, Leon; Livinski, Alicia; Mackinney, John; Maidment, Bert W; Manning, Ronald; Marinissen, Maria J; Martin, Colleen; Michael, Gretchen; Murrain-Hill, Paula; Nemhauser, Jeffrey B; Norwood, Ann E; Nystrom, Scott; Raheem, Murad; Redlener, Irwin; Sheehan, Kevin; Simon, Steven L; Taylor, Tammy P; Toner, Eric; Wallace, Katherine S; Wieder, Jessica; Weinstock, David M; Wiley, Albert L; Yeskey, Kevin; Miller, Charles W; Whitcomb, Robert C

    2012-12-01

    This article summarizes major points from a newly released guide published online by the Office of the Assistant Secretary for Preparedness and Response (ASPR). The article reviews basic principles about radiation and its measurement, short-term and long-term effects of radiation, and medical countermeasures as well as essential information about how to prepare for and respond to a nuclear detonation. A link is provided to the manual itself, which in turn is heavily referenced for readers who wish to have more detail.

  17. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  18. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  19. Guide to preparing SAND reports. Revised

    Energy Technology Data Exchange (ETDEWEB)

    Locke, T.K. [ed.

    1996-04-01

    This guide contains basic information needed to produce a SAND report. Its guidelines reflect DOE regulation and Sandia policy. The guide includes basic writing instructions in an annotated sample report; guidance for organization, format, and layout of reports produced by line organizations; and information about conference papers, journal articles, and brochures. The appendixes contain sections on Sandia`s preferred usage, equations, references, copyrights and permissions, and publishing terms.

  20. Preparing Soups. Learning Activity Pack and Instructor's Guide 5.10b. Commercial Foods and Culinary Arts Competency-Based Series. Section 5: Basic Food Preparation.

    Science.gov (United States)

    Florida State Univ., Tallahassee. Center for Studies in Vocational Education.

    This document consists of a learning activity packet (LAP) for the student and an instructor's guide for the teacher. The LAP is intended to acquaint occupational home economics students with preparing and serving soups. Illustrated information sheets and learning activities are provided in these areas: thin soups, thick soups, convenience soups,…

  1. Strategic planning and action on climate change: A guide for Canadian mining companies

    International Nuclear Information System (INIS)

    2000-01-01

    This Guide has been developed by the Pembina Institute for Appropriate Development of Drayton Valley, Alberta and Stratos Inc., of Ottawa, as a project for the Mining Association of Canada, in an effort to assist senior executives in the Canadian mining industry in developing corporate strategic responses to the risks and opportunities associated with climate change and sustainable development. Section One of the Guide provides an introduction to the scientific, political and legal issues involved in climate change. Section Two outlines the implications of this issue for Canadian mining companies. Section Three and Four provide senior managers with a strategic framework to help understand the scope of a comprehensive response and assist them in developing and integrating climate change policies into their overall corporate strategy and business plan. Section Five outlines the major components of a generic climate change strategy and action plan, while Section Six looks at specific technical opportunity areas where mining companies can reduce greenhouse gas emissions. Section Seven focuses on business opportunities related to greenhouse gas emission reductions that can be implemented domestically or internationally outside of Canadian mining operations. Section Eight concludes the Guide with a comprehensive list of references and additional sources of information to assist users in follow-up and implementation. The accompanying companion handbook, entitled 'Guide to inventorying, measuring and reporting on climate change actions for MAC member companies' is designed to be used by energy managers and technical support staff who are responsible for implementing greenhouse gas measurement reporting systems. In addition to the Guide, the Mining Association and the Pembina Institute also developed three versions of a climate change strategy workshop designed for mining company personnel at different levels and different responsibilities. These workshops can also be

  2. Tribal Decisions-Makers Guide to Solid Waste Management: Chapter 2 - Developing Solid Waste Management Plans

    Science.gov (United States)

    Solid waste management plans offer a host of benefits for tribes and Alaskan Native villages. Through the preparation of these plans, you can assess your cur-rent and future waste management needs, set priorities, and allocate resources accordingly.

  3. Interactive orbital proximity operations planning system instruction and training guide

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  4. Lone Actor Terrorist Attack Planning and Preparation : A Data-Driven Analysis

    NARCIS (Netherlands)

    Schuurman, B.W.; Bakker, E.; Gill, P.; Bouhana, N.

    2017-01-01

    This article provides an in-depth assessment of lone actor terrorists’ attack planning and preparation. A codebook of 198 variables related to different aspects of pre-attack behavior is applied to a sample of 55 lone actor terrorists. Data were drawn from open-source materials and complemented

  5. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  6. The Effects of Guided Careful Online Planning on Complexity, Accuracy and Fluency in Intermediate EFL Learners' Oral Production: The Case of English Articles

    Science.gov (United States)

    Ahmadian, Mohammad Javad

    2012-01-01

    The purpose of the study reported in this article was twofold: First, to see whether guided careful online planning assists intermediate learners of English as a foreign language (EFL) in accurate oral production of English articles ("an/a" and "the"); and, second, to see whether guided careful online planning has any effects…

  7. EEG signatures of arm isometric exertions in preparation, planning and execution.

    Science.gov (United States)

    Nasseroleslami, Bahman; Lakany, Heba; Conway, Bernard A

    2014-04-15

    The electroencephalographic (EEG) activity patterns in humans during motor behaviour provide insight into normal motor control processes and for diagnostic and rehabilitation applications. While the patterns preceding brisk voluntary movements, and especially movement execution, are well described, there are few EEG studies that address the cortical activation patterns seen in isometric exertions and their planning. In this paper, we report on time and time-frequency EEG signatures in experiments in normal subjects (n=8), using multichannel EEG during motor preparation, planning and execution of directional centre-out arm isometric exertions performed at the wrist in the horizontal plane, in response to instruction-delay visual cues. Our observations suggest that isometric force exertions are accompanied by transient and sustained event-related potentials (ERP) and event-related (de-)synchronisations (ERD/ERS), comparable to those of a movement task. Furthermore, the ERPs and ERD/ERS are also observed during preparation and planning of the isometric task. Comparison of ear-lobe-referenced and surface Laplacian ERPs indicates the contribution of superficial sources in supplementary and pre-motor (FC(z)), parietal (CP(z)) and primary motor cortical areas (C₁ and FC₁) to ERPs (primarily negative peaks in frontal and positive peaks in parietal areas), but contribution of deep sources to sustained time-domain potentials (negativity in planning and positivity in execution). Transient and sustained ERD patterns in μ and β frequency bands of ear-lobe-referenced and surface Laplacian EEG indicate the contribution of both superficial and deep sources to ERD/ERS. As no physical displacement happens during the task, we can infer that the underlying mechanisms of motor-related ERPs and ERD/ERS patterns do not only depend on change in limb coordinate or muscle-length-dependent ascending sensory information and are primary generated by motor preparation, direction

  8. Dinosaurs and Power Plants. Energy from the Past for the Future. Teacher's Lesson Plan and Activity Guide; Teacher's Guide Supplement of Reproducible Graphics.

    Science.gov (United States)

    Department of Energy, Washington, DC. Office of Fossil Energy.

    This teacher's guide and its accompanying supplement were prepared for use with the U.S. Department of Energy's Dinosaurs and Power Plants, a publication designed for students in grades 5-8 about the history, detection, extraction, transportation, use, environmental problem/solutions, and future of fossil energy. The study of energy science shows…

  9. Facility Effluent Monitoring Plan for the uranium trioxide facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  10. Atlas-guided generation of pseudo-CT images for MRI-only and hybrid PET-MRI-guided radiotherapy treatment planning

    Science.gov (United States)

    Arabi, Hossein; Koutsouvelis, Nikolaos; Rouzaud, Michel; Miralbell, Raymond; Zaidi, Habib

    2016-09-01

    Magnetic resonance imaging (MRI)-guided attenuation correction (AC) of positron emission tomography (PET) data and/or radiation therapy (RT) treatment planning is challenged by the lack of a direct link between MRI voxel intensities and electron density. Therefore, even if this is not a trivial task, a pseudo-computed tomography (CT) image must be predicted from MRI alone. In this work, we propose a two-step (segmentation and fusion) atlas-based algorithm focusing on bone tissue identification to create a pseudo-CT image from conventional MRI sequences and evaluate its performance against the conventional MRI segmentation technique and a recently proposed multi-atlas approach. The clinical studies consisted of pelvic CT, PET and MRI scans of 12 patients with loco-regionally advanced rectal disease. In the first step, bone segmentation of the target image is optimized through local weighted atlas voting. The obtained bone map is then used to assess the quality of deformed atlases to perform voxel-wise weighted atlas fusion. To evaluate the performance of the method, a leave-one-out cross-validation (LOOCV) scheme was devised to find optimal parameters for the model. Geometric evaluation of the produced pseudo-CT images and quantitative analysis of the accuracy of PET AC were performed. Moreover, a dosimetric evaluation of volumetric modulated arc therapy photon treatment plans calculated using the different pseudo-CT images was carried out and compared to those produced using CT images serving as references. The pseudo-CT images produced using the proposed method exhibit bone identification accuracy of 0.89 based on the Dice similarity metric compared to 0.75 achieved by the other atlas-based method. The superior bone extraction resulted in a mean standard uptake value bias of  -1.5  ±  5.0% (mean  ±  SD) in bony structures compared to  -19.9  ±  11.8% and  -8.1  ±  8.2% achieved by MRI segmentation-based (water

  11. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  12. Enhancing Student’s Understanding in Entrepreneurship Through Business Plan Simulation

    Directory of Open Access Journals (Sweden)

    Guzairy M.

    2018-01-01

    Full Text Available Business Plan is an important document for entrepreneurs to guide them managing their business. Business Plan also assist the entrepreneur to strategies their business and manage future growth. That is why Malaysian government has foster all Higher Education Provider to set entrepreneurship education as compulsory course. One of the entrepreneurship education learning outcome is the student can write effective business plan. This study focused on enhancing student’s understanding in entrepreneurship through business plan simulation. This study also considers which of the factor that most facilitate the business simulation that help the student to prepare effective business plan. The methodology of this study using quantitative approach with pre-and post-research design. 114 students take part as respondent in the business simulation and answer quantitative survey pre-question and post question. The crucial findings of this study are student characteristic factor after playing the simulation contribute much on facilitate business plan learning. The result has shown that the business plan simulation can enhance undergraduate student in understanding entrepreneurship by preparing effective business plan before opening new startup.

  13. Facility Effluent Monitoring Plan for the Spent Nuclear Fuel (SNF) Project

    International Nuclear Information System (INIS)

    HUNACEK, G.S.

    2000-01-01

    A facility effluent monitoring plan is required by the US. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in Westinghouse Hanford Company (WHC)-EP-0438-1, ''A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans'', and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the third revision to the original annual report. This document is reviewed annually even if there are no operational changes, and it is updated as necessary

  14. CT-guided intracavitary radiotherapy for cervical cancer: Comparison of conventional point A plan with clinical target volume-based three-dimensional plan using dose-volume parameters

    International Nuclear Information System (INIS)

    Shin, Kyung Hwan; Kim, Tae Hyun; Cho, Jung Keun; Kim, Joo-Young; Park, Sung Yong; Park, Sang-Yoon; Kim, Dae Yong; Chie, Eui Kyu; Pyo, Hong Ryull; Cho, Kwan Ho

    2006-01-01

    Purpose: To perform an intracavitary radiotherapy (ICR) plan comparison between the conventional point A plan (conventional plan) and computed tomography (CT)-guided clinical target volume-based plan (CTV plan) by analysis of the quantitative dose-volume parameters and irradiated volumes of organs at risk in patients with cervical cancer. Methods and Materials: Thirty plans for 192 Ir high-dose-rate ICR after 30-40-Gy external beam radiotherapy were investigated. CT images were acquired at the first ICR session with artifact-free applicators in place. The gross tumor volume, clinical target volume (CTV), point A, and International Commission on Radiation Units and Measurements Report 38 rectal and bladder points were defined on reconstructed CT images. A fractional 100% dose was prescribed to point A in the conventional plan and to the outermost point to cover all CTVs in the CTV plan. The reference volume receiving 100% of the prescribed dose (V ref ), and the dose-volume parameters of the coverage index, conformal index, and external volume index were calculated from the dose-volume histogram. The bladder, rectal point doses, and percentage of volumes receiving 50%, 80%, and 100% of the prescribed dose were also analyzed. Results: Conventional plans were performed, and patients were categorized on the basis of whether the 100% isodose line of point A prescription dose fully encompassed the CTV (Group 1, n = 20) or not (Group 2, n = 10). The mean gross tumor volume (11.6 cm 3 ) and CTV (24.9 cm 3 ) of Group 1 were smaller than the corresponding values (23.7 and 44.7 cm 3 , respectively) for Group 2 (p = 0.003). The mean V ref for all patients was 129.6 cm 3 for the conventional plan and 97.0 cm 3 for the CTV plan (p = 0.003). The mean V ref in Group 1 decreased markedly with the CTV plan (p < 0.001). For the conventional and CTV plans in all patients, the mean coverage index, conformal index, and external volume index were 0.98 and 1.0, 0.23 and 0.34, and 3.86 and

  15. Histological Evaluation of Degradable Guided Bone Regeneration Membranes Prepared from Poly(trimethylene carbonate) and Biphasic Calcium Phosphate Composites

    NARCIS (Netherlands)

    Zeng, Ni; van Leeuwen, Anne; Bos, Ruud R.M.; Grijpma, Dirk W.; Kuijer, Roel

    2013-01-01

    In oral and maxillofacial surgery, guided bone regeneration using barrier membranes is an important strategy to treat bone defects. The currently used barrier membranes have important disadvantages. Barrier membranes prepared from resorbable poly(trimethylene carbonate) (PTMC) performed as well as

  16. Histological evaluation of degradable guided bone regeneration membranes prepared from poly(trimethylene carbonate) and biphasic calcium phosphate composites

    NARCIS (Netherlands)

    Zeng, Ni; van Leeuwen, Anne; Bos, Ruud R.M.; Grijpma, Dirk W.; Kuijer, Roel

    2013-01-01

    In oral and maxillofacial surgery, guided bone regeneration using barrier membranes is an important strategy to treat bone defects. The currently used barrier membranes have important disadvantages. Barrier membranes prepared from resorbable poly(trimethylene carbonate) (PTMC) performed as well as

  17. Preparation of off-site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This document is issued as a lead document to facilitate preparation of specific site manuals by the Responsible Organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publication on the subject: Safety Manual on Off-Site Emergency Plan for Nuclear Installations, AERB/SM/NISD-2, 1988 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come out in a significant manner after the accidents at Chernobyl and Bhopal

  18. Facility effluent monitoring plan for 242-A evaporator facility

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years

  19. Facility effluent monitoring plan for the B plant

    International Nuclear Information System (INIS)

    Lesser, J.E.

    1994-09-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plant assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated every three years

  20. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  1. Guia de ideas para la Planificacion y Aplicacion de Proyectos Intergeneracionales (Guide of Ideas for Planning and Implementing Intergenerational Projects)

    Science.gov (United States)

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    This version of "Guide of Ideas for Planning and Implementing Intergenerational Projects," written in Spanish, is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity,…

  2. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  3. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  4. Facility effluent monitoring plan for the plutonium uranium extraction facility

    International Nuclear Information System (INIS)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  5. Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility

    International Nuclear Information System (INIS)

    Greager, E.M.

    1997-01-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years

  6. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  7. 75 FR 25876 - Notice of Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs...

    Science.gov (United States)

    2010-05-10

    ... Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs National Conservation... Environmental Impact Statement, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent..., intends to prepare Resource Management Plans (RMP) for the Beaver Dam Wash and the Red Cliffs National...

  8. Hanford Site Guide for Preparing and Maintaining Fenerator Group Pollution Prevention Program Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    1999-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and (300501) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMinn ) Assessments (WMAs); Pollution Prevention (P2) Reporting; WMin Certification

  9. Security+ study guide study guide and practice exam

    CERN Document Server

    Dubrawsky, Ido; Dubrawsky

    2007-01-01

    Over 700,000 IT Professionals Have Prepared for Exams with Syngress Authored Study GuidesThe Security+ Study Guide & Practice Exam is a one-of-a-kind integration of text and and Web-based exam simulation and remediation. This system gives you 100% coverage of official CompTIA Security+ exam objectives plus test preparation software for the edge you need to achieve certification on your first try! This system is comprehensive, affordable, and effective!* Completely Guaranteed Coverage of All Exam ObjectivesAll five Security+ domains are covered in full: General Securi

  10. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  11. Global Nuclear Energy Partnership Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  12. Role of image-guided patient repositioning and online planning in localized prostate cancer IMRT

    International Nuclear Information System (INIS)

    Lerma, Fritz A.; Liu, Bei; Wang, Zhendong; Yi, Byongyong; Amin, Pradip; Liu, Sandy; Feng Yuanming; Yu, Cedric X.

    2009-01-01

    Purpose: To determine the expected benefit of image-guided online replanning over image-guided repositioning of localized prostate cancer intensity-modulated radiotherapy (IMRT). Materials and methods: On 10 to 11 CT scans of each of 10 early-stage prostate cancer patients, the prostate, bladder and rectum are manually segmented. Using a 3-mm PTV margin expansion from the CTV, an IMRT plan is made on the first CT scan of each patient. Online repositioning is simulated by recalculating the IMRT plan from the initial CT scan on the subsequent CT scans of each patient. For online replanning, IMRT is replanned twice on all CT scans, using 0-mm and 3-mm margins. The doses from subsequent CT images of each patient are then deformed to the initial CT anatomy using a mesh-based thin-plate B-spline deformation method and are accumulated for DVH and isodose review. Results: Paired t-tests show that online replanning with 3-mm margins significantly increases the prostate volume receiving the prescribed dose over replanning with 0-mm margins (p-value 0.004); gives marginally better target coverage than repositioning with 3-mm margins(p-value 0.06-0.343), and reduces variations in target coverage over repositioning. Fractional volumes of rectum and bladder receiving 75%, 80%, 85%, 90%, and 95% (V75, V80, V85, V90, and V95) of the prescription dose are evaluated. V90 and V95 values for the rectum are 1.6% and 0.7 % for 3-mm margin replanning and 1% and 0.4 % for 0-mm margin replanning, with p-values of 0.010-0.011. No significant differences between repositioning and replanning with 3-mm margins are found for both the rectum and the bladder. Conclusions: Image-guided replanning using 3-mm margins reduces target coverage variations, and maintains comparable rectum and bladder sparing to patient repositioning in localized prostate cancer IMRT. Marginal reductions in doses to rectum and bladder are possible when planning margins are eliminated in the online replanning scenario

  13. Development of the Decommissioning Planning System for the WWR-M Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lobach, Y. [Institute for Nuclear Research, Kiev (Ukraine)

    2013-08-15

    Kiev's research reactor WWR-M is in operation for more than 50 years and its continued operation is planned. At the same time the development of a decommissioning plan is a mandatory requirement of the national legislation and it must be performed at the operational stage of nuclear installation as early as possible. Recently, the Decommissioning Programme for the WWR-M reactor has been developed. The programme covers the whole decommissioning process and represents the main guiding document during the whole decommissioning period, which determines and substantiates the principal technical and organizational activities on the preparation and implementation of the reactor decommissioning, the consequence of the decommissioning stages, the sequence of planned works and measures as well as the necessary conditions and infrastructure for the provision and safe implementation. The programme contains the basic directions of further decommissioning planning aimed on the timely preparation for the reactor decommissioning. This paper describes the status of the WWR-M reactor decommissioning planning attained by the middle of 2011. (author)

  14. Workshop for development of formal MC and A plans

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.; Scott, S.C.; Thomas, K.E.

    1998-01-01

    Upgrades to both physical protection and material controls and accountability (MC and A) are progressing at many nuclear facilities in the Russian Federation. In general, Russian facilities are well prepared to address issues related to physical protection. The infrastructure to plan and implement physical protection upgrades is already in place in Russia. The infrastructure to integrate new and existing MC and A capabilities is not as well developed. The authors experience has shown that working with Russian facility management and technical personnel to draft an MC and A plan provides a way of moving MC and A upgrades forward. Los Alamos has developed a workshop for Russian nuclear facilities to facilitate the preparation of their facility MC and A plans. The workshops have been successful in bringing together facility management, safeguards specialists, and operations personnel to initiate the process of drafting these MC and A plans. The MC and A plans provide the technical basis for scheduling future MC and A upgrades at the facilities. Although facility MC and A plans are site specific, the workshop can be tailored to guide the development of an MC and A plan for any Russian nuclear site

  15. 78 FR 55290 - Approved Recovery Plan for the Dwarf Lake Iris

    Science.gov (United States)

    2013-09-10

    ... by sending a request to Field Supervisor, U.S. Fish and Wildlife Service, Ecological Services Field... INFORMATION: Background Restoring an endangered or threatened animal or plant to the point where it is again a... program. To help guide the recovery effort, we are working to prepare recovery plans for most of the...

  16. Dosimetric consequences of the shift towards computed tomography guided target definition and planning for breast conserving radiotherapy

    Directory of Open Access Journals (Sweden)

    Korevaar Erik W

    2008-01-01

    Full Text Available Abstract Background The shift from conventional two-dimensional (2D to three-dimensional (3D-conformal target definition and dose-planning seems to have introduced volumetric as well as geometric changes. The purpose of this study was to compare coverage of computed tomography (CT-based breast and boost planning target volumes (PTV, absolute volumes irradiated, and dose delivered to the organs at risk with conventional 2D and 3D-conformal breast conserving radiotherapy. Methods Twenty-five patients with left-sided breast cancer were subject of CT-guided target definition and 3D-conformal dose-planning, and conventionally defined target volumes and treatment plans were reconstructed on the planning CT. Accumulated dose-distributions were calculated for the conventional and 3D-conformal dose-plans, taking into account a prescribed dose of 50 Gy for the breast plans and 16 Gy for the boost plans. Results With conventional treatment plans, CT-based breast and boost PTVs received the intended dose in 78% and 32% of the patients, respectively, and smaller volumes received the prescribed breast and boost doses compared with 3D-conformal dose-planning. The mean lung dose, the volume of the lungs receiving > 20 Gy, the mean heart dose, and volume of the heart receiving > 30 Gy were significantly less with conventional treatment plans. Specific areas within the breast and boost PTVs systematically received a lower than intended dose with conventional treatment plans. Conclusion The shift towards CT-guided target definition and planning as the golden standard for breast conserving radiotherapy has resulted in improved target coverage at the cost of larger irradiated volumes and an increased dose delivered to organs at risk. Tissue is now included into the breast and boost target volumes that was never explicitly defined or included with conventional treatment. Therefore, a coherent definition of the breast and boost target volumes is needed, based on

  17. Dosimetric consequences of the shift towards computed tomography guided target definition and planning for breast conserving radiotherapy

    International Nuclear Information System (INIS)

    Laan, Hans Paul van der; Dolsma, Wil V; Maduro, John H; Korevaar, Erik W; Langendijk, Johannes A

    2008-01-01

    The shift from conventional two-dimensional (2D) to three-dimensional (3D)-conformal target definition and dose-planning seems to have introduced volumetric as well as geometric changes. The purpose of this study was to compare coverage of computed tomography (CT)-based breast and boost planning target volumes (PTV), absolute volumes irradiated, and dose delivered to the organs at risk with conventional 2D and 3D-conformal breast conserving radiotherapy. Twenty-five patients with left-sided breast cancer were subject of CT-guided target definition and 3D-conformal dose-planning, and conventionally defined target volumes and treatment plans were reconstructed on the planning CT. Accumulated dose-distributions were calculated for the conventional and 3D-conformal dose-plans, taking into account a prescribed dose of 50 Gy for the breast plans and 16 Gy for the boost plans. With conventional treatment plans, CT-based breast and boost PTVs received the intended dose in 78% and 32% of the patients, respectively, and smaller volumes received the prescribed breast and boost doses compared with 3D-conformal dose-planning. The mean lung dose, the volume of the lungs receiving > 20 Gy, the mean heart dose, and volume of the heart receiving > 30 Gy were significantly less with conventional treatment plans. Specific areas within the breast and boost PTVs systematically received a lower than intended dose with conventional treatment plans. The shift towards CT-guided target definition and planning as the golden standard for breast conserving radiotherapy has resulted in improved target coverage at the cost of larger irradiated volumes and an increased dose delivered to organs at risk. Tissue is now included into the breast and boost target volumes that was never explicitly defined or included with conventional treatment. Therefore, a coherent definition of the breast and boost target volumes is needed, based on clinical data confirming tumour control probability and normal

  18. Nutritious Meal Planning; Commercial Cooking and Baking I: 9193.02.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    This 90 clock hour course has been prepared as a guide for the tenth grade student in commercial cooking and baking or food management, production and services. It has been divided into six blocks of instruction (menu planning, recipes, condiments and their uses, introduction to cooking, food cost and accounting), and a Quinmester post-test. As a…

  19. Evaluation criteria for emergency response plans in radiological transportation

    International Nuclear Information System (INIS)

    Lindell, M.K.; Perry, R.W.

    1980-01-01

    This paper identifies a set of general criteria which can be used as guides for evaluating emergency response plans prepared in connection with the transportation of radiological materials. The development of criteria takes the form of examining the meaning and role of emergency plans in general, reviewing the process as it is used in connection with natural disasters and other nonnuclear disasters, and explicitly considering unique aspects of the radiological transportation setting. Eight areas of critical importance for such response plans are isolated: notification procedures; accident assessment; public information; protection of the public at risk; other protective responses; radiological exposure control; responsibility for planning and operations; and emergency response training and exercises. (Auth.)

  20. Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    2000-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 2000) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994) and Department of Energy Acquisition Regulations (DEAR) (48 CFR 970.5204-2 and 48 CFR 970.5204-78). Documentation guidance for the following five P2/WMin elements is discussed: Fiscal Year (FY) Goals; Budget and Staffing; Pollution Prevention (P2) Reporting; WMin Certification; and Waste Minimization (WMin) Assessments (WMAs)

  1. The management plan preparation activities nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Utomo

    2011-01-01

    A feasibility Study that has been updated show that two nuclear power units with each unit of power up to 1000 MWe can represent decently an economical alternative energy supply. It added that the available time schedule was quite tight so that the preparation for the development must be starting first. This paper will discuss the preparation of plans of the first nuclear power plant which includes program activities, the structure of contracts, schedules of activities and funding. From the information obtained to date that in addition to a candidate site that is ready to be built in Muria peninsula is still required another potential alternative site besides to search other complete data information. This site investigation activities completed within the time schedule was passed ''critical path'', so that these activities should be carried out intensively and obey the time. This paper describes the steps that need to be prepared to welcome the first nuclear power plant, after reviewing the various input above and apply the reality in Indonesia as the initial conditions. (author)

  2. Preoperative digital planning versus postoperative outcomes in total hip arthroplasty using a calcar-guided short stem: frequent valgization can be avoided.

    Science.gov (United States)

    Kutzner, Karl Philipp; Pfeil, Joachim; Kovacevic, Mark Predrag

    2017-07-01

    Modern total hip arthroplasty is largely dependent on the successful preservation of hip geometry. Thus, a successful implementation of the preoperative planning is of great importance. The present study evaluates the accuracy of anatomic hip reconstruction predicted by 2D digital planning using a calcar-guided short stem of the newest generation. A calcar-guided short stem was implanted in 109 patients in combination with a cementless cup using the modified anterolateral approach. Preoperative digital planning was performed including implant size, caput-collum-diaphyseal angle, offset, and leg length using mediCAD II software. A coordinate system and individual scale factors were implemented. Postoperative outcome was evaluated accordingly and was compared to the planning. Intraoperatively used stem sizes were within one unit of the planned stem sizes. The postoperative stem alignment showed a minor and insignificant (p = 0.159) mean valgization of 0.5° (SD 3.79°) compared to the planned caput-collum-diaphyseal angles. Compared to the planning, mean femoral offset gained 2.18 (SD 4.24) mm, while acetabular offset was reduced by 0.78 (SD 4.36) mm during implantation resulting in an increased global offset of 1.40 (SD 5.51) mm (p = 0.0094). Postoperative femoroacetabular height increased by a mean of 5.00 (SD 5.98) mm (p planning in calcar-guided short-stem total hip arthroplasty assures a satisfying implementation of the intended anatomy. Valgization, which has been frequently observed in previous short-stem designs, negatively affecting offset, can be avoided. However, surgeons have to be aware of a possible leg lengthening.

  3. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Thompson, R.J.; Sontage, S.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  4. Adherence to the USDA Food Guide, DASH Eating Plan, and Mediterranean dietary pattern reduces risk of colorectal adenoma.

    Science.gov (United States)

    Dixon, L Beth; Subar, Amy F; Peters, Ulrike; Weissfeld, Joel L; Bresalier, Robert S; Risch, Adam; Schatzkin, Arthur; Hayes, Richard B

    2007-11-01

    The 2005 Dietary Guidelines for Americans include quantitative recommendations for 2 eating patterns, the USDA Food Guide and the Dietary Approaches to Stop Hypertension (DASH) Eating Plan, to promote optimal health and reduce disease risk. A Mediterranean dietary pattern has also been promoted for health benefits. Our objective was to determine whether adherence to the USDA Food Guide recommendations, the DASH Eating Plan, or a Mediterranean dietary pattern is associated with reduced risk of distal colorectal adenoma. In the Prostate, Lung, Colorectal, and Ovarian Cancer Screening Trial, men and women aged 55-74 y were screened for colorectal cancer by sigmoidoscopy at 10 centers in the U.S. After adjusting for potential confounders, men who most complied with the USDA Food Guide recommendations had a 26% reduced risk of colorectal adenoma compared with men who least complied with the recommendations (OR USDA score >or= 5 vs. dietary pattern. Women who most complied with the USDA Food Guide recommendations had an 18% reduced risk for colorectal adenoma, but subgroup analyses revealed protective associations only for current smokers (OR USDA score >or= 5 vs. or= 5 vs. dietary recommendations or a Mediterranean dietary pattern is associated with reduced risk of colorectal adenoma, especially in men.

  5. Hanford Site guide for preparing and maintaining generator group pollution prevention program documentation

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMin) Assessments (WMAs); Quarterly Pollution Prevention (P2) Reporting WMin Certification

  6. IAEA activities to prepare safety codes and guides for thermal neutron nuclear power plants

    International Nuclear Information System (INIS)

    Iansiti, E.

    1977-01-01

    In accordance with the programme presented to, and endorsed by, the eighteenth General Conference in September 1974, the IAEA is now developing a complete set of safety codes and guides that will represent recommendations for the safety of thermal neutron power plants. The safety codes outline the minimum requirements for achieving this safety, and the safety guides set forth the criteria, procedures and methods to implement the safety codes. The whole programme is directed towards the five areas of Governmental Organization, Siting, Design, Operation, and Quality Assurance. One Scientific Secretary from the Agency Secretariat is responsible for each of these areas and a Co-ordinator takes care of common problems. For the development of each of these documents a working group of a few world experts is first convened which prepare a preliminary draft. This draft is then reviewed by a larger, international Technical Review Committee (one for each of the five areas) and a subsequent review by the Senior Advisory Group - with representatives from 20 states - ensures that the document is well coordinated within the programme. At this stage, it is sent to Member States for comments. The Technical Review Committee concerned is reconvened to integrate these comments into the document, and, after a final review by the Senior Advisory Group, the document is ready for transmission to the Director General of the Agency for endorsement and publication. A preliminary to this procedure is the collation by the Secretariat of large amounts of information submitted by Member States so that the first draft is really based on a very complete knowledge of what is done in each area all over the world. This collation frequently reveals differences in approach which are not random but due, rather, to the local conditions and the types of reactors. These differences must be harmonized in the documents produced without detracting from the effectiveness of the code or guide. The whole

  7. Rallying the troops: a four-step guide to preparing a residency program for short-term weather emergencies.

    Science.gov (United States)

    Chow, Grant V; Hayashi, Jennifer; Hirsch, Glenn A; Christmas, Colleen

    2011-04-01

    Weather emergencies present a multifaceted challenge to residents and residency programs. Both the individual trainee and program may be pushed to the limits of physical and mental strain, potentially jeopardizing core competencies of patient care and professionalism. Although daunting, the task of preparing for these events should be a methodical process integrated into every residency training program. The core elements of emergency preparation with regard to inpatient services include identifying and staffing critical positions, motivating residents to consider the needs of the group over those of the individual, providing for basic needs, and planning activities in order to preserve team morale and facilitate recovery. The authors outline a four-step process in preparing a residency program for an anticipated short-term weather emergency. An example worksheet for emergency planning is included. With adequate preparation, residency training programs can maintain the highest levels of patient care, professionalism, and esprit de corps during weather emergencies. When managed effectively, emergencies may present an opportunity for professional growth and a sense of unity for those involved.

  8. In Vivo Tooth-Supported Implant Surgical Guides Fabricated With Desktop Stereolithographic Printers: Fully Guided Surgery Is More Accurate Than Partially Guided Surgery.

    Science.gov (United States)

    Bencharit, Sompop; Staffen, Adam; Yeung, Matthew; Whitley, Daniel; Laskin, Daniel M; Deeb, George R

    2018-02-21

    Desktop stereolithographic printers combined with intraoral scanning and implant planning software promise precise and cost-effective guided implant surgery. The purpose of the present study was to determine the overall range of accuracy of tooth-supported guided implant surgery using desktop printed stereolithographic guides. A cross-sectional study comparing fully and partially guided implant surgery was conducted. Preoperative cone beam computed tomography (CBCT) and intraoral scans were used to plan the implant sites. Surgical guides were then fabricated using a desktop stereolithographic 3-dimensional printer. Postoperative CBCT was used to evaluate the accuracy of placement. Deviations from the planned positions were used as the primary outcome variables. The planning software used, implant systems, and anterior/posterior positions were the secondary outcome variables. The differences between the planned and actual implant positions in the mesial, distal, buccal, and lingual dimensions and buccolingual angulations were determined, and the accuracy was compared statistically using the 1-tail F-test (P = .01), box plots, and 95% confidence intervals for the mean. Sixteen partially edentulous patients requiring placement of 31 implants were included in the present study. The implant deviations from the planned positions for mesial, distal, buccal, and lingual dimensions and buccolingual angulations with the fully guided protocol (n = 20) were 0.17 ± 0.78 mm, 0.44 ± 0.78 mm, 0.23 ± 1.08 mm, -0.22 ± 1.44 mm, and -0.32° ± 2.36°, respectively. The corresponding implant deviations for the partially guided protocol (n = 11) were 0.33 ± 1.38 mm, -0.03 ± 1.59 mm, 0.62 ± 1.15 mm, -0.27 ± 1.61 mm, and 0.59° ± 6.83°. The difference between the variances for fully and partially guided surgery for the distal and angulation dimensions was statistically significant (P = .006 and P guided implant surgery is more accurate than

  9. Early and unintentional release of planned motor actions during motor cortical preparation.

    Directory of Open Access Journals (Sweden)

    Colum D MacKinnon

    Full Text Available Voluntary movements are often preceded by a movement-related potential beginning as much as two seconds prior to the onset of movement. In light of evidence that motor actions can be prepared and initiated in less than 200 ms, the function of this early activity has remained enigmatic. We hypothesized that the movement-related potential reflects the state of preparation of the planned movement. This was tested by delivering a startling acoustic stimulus during the preparation phase of a load-release task. The cue to release the load was presented either 3.5 seconds after a warning cue (PREDICT condition or randomly between 4-12 seconds (REACT condition. Electroencephalographic, electromyographic and limb and load kinematic signals were recorded. In a subset of trials, a startle stimulus was delivered at -1500, -1000, -500, -250, -100 or 0 ms before the release cue. A contingent-negative variation (CNV waveform, with a late phase of slow-rising negativity beginning an average of 1459 ms prior to movement, was observed for the PREDICT condition but not the REACT condition. For both conditions, the startle stimulus frequently evoked the early and unintentional release of the load-release sequence. The incidence of release was significantly (p<0.001 correlated with the late phase of the CNV for the PREDICT condition but not the REACT condition. For the REACT condition, the incidence of movement release was subject-specific, constant across the preparation interval, and uncorrelated with cortical activity. The onset of movement release by the startle stimulus was significantly shorter (p<0.001 for the PREDICT compared to the REACT condition. These findings provide evidence that the late phase of the CNV reflects cortical activity mediating the progressive preparation and storage of the forthcoming movement and that during this phase an intense sensory stimulus can evoke early and unintentional release of the planned action.

  10. Standard format and content of a licensee physical protection plan for strategic special nuclear material in transit - April 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A predetermined plan to respond to safeguards contingency events is required to be prepared, based on personnel and other physical protection resources described in the Physical Protection Plan for strategic special nuclear material (SSNM) in transit. Specific requirements for the contingency plan are provided in Appendix C. Licensee Safeguards Contingency Plans, to 10 CFR Part 73. Regulatory Guide 5.56, Standard Format and Content of Safeguards Contingency Plans for Transportation, provides guidance for the preparation of transportation contingency plans. Licensee is reminded that all three submissions - the Physical Protection Plan, the Physical Protection Arrangements for Specific Shipments, and the Safeguards Contingency Plan - together describe the system for physical protection of each particular shipment. They should be developed and maintained to be completely consistent with each other for each shipment

  11. 78 FR 4868 - Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

    Science.gov (United States)

    2013-01-23

    ... specifically identified for sale in the CDCA Plan, as amended, and a plan amendment is therefore required to.... The BLM anticipates that the EA will consider both a plan amendment and the subsequent sale of the...] Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

  12. Workflow efficiency for the treatment planning process in CT-guided high-dose-rate brachytherapy for cervical cancer.

    Science.gov (United States)

    Michaud, Anthony L; Benedict, Stanley; Montemayor, Eliseo; Hunt, Jon Paul; Wright, Cari; Mathai, Mathew; Mayadev, Jyoti S

    2016-01-01

    To investigate process efficiency, we present a prospective investigation of the treatment planning phase of image-guided brachytherapy (BT) for cervical cancer using a specific checklist. From October 2012 to January 2014, 76 BT procedures were consecutively performed. Prospective data on the CT-based treatment planning process was collected using a specific checklist which details the following steps: (1) dosimetry planning, (2) physician review start, (3) physician review time, (4) dosimetry processing, (5) physics review start, (6) physics review, and (7) procedural pause. Variables examined included the use of a pre-BT MRI, clinic duty conflicts, resident teaching, and the use of specific BT planners. Analysis was performed using descriptive statistics, t-test, and analysis of variance. Seventy-five prospectively gathered checklists comprised this analysis. The mean time for treatment planning was 95 minutes (med 94, std 18). The mean intervals in the above steps were (1) = 42, (2) = 5, (3) = 19, (4) = 10, (5) = 6, (6) = 13, and (7) = 26 minutes. There was no statistical difference in patients who had a pre-BT MRI. Resident teaching did not influence time, p = 0.17. Treatment planning time was decreased with a specific planner, p = 0.0015. A skillful team approach is required for treatment planning efficiency in image-guided BT. We have found that the specific BT planners can have a significant effect on the overall planning efficiency. We continue to examine clinical and workflow-related factors that will enhance our safety and workflow process with BT. Published by Elsevier Inc.

  13. Buying, Preparing, and Cooking Shellfish. Learning Activity Pack and Instructor's Guide 5.13c. Commercial Foods and Culinary Arts Competency-Based Series. Section 5: Basic Food Preparation.

    Science.gov (United States)

    Florida State Univ., Tallahassee. Center for Studies in Vocational Education.

    This document consists of a learning activity packet (LAP) for the student and an instructor's guide for the teacher. The LAP is intended to acquaint occupational home economics students with the various market forms of shellfish and how to clean, prepare, and cook them. Illustrated information sheets and learning activities are provided in these…

  14. PET/CT-guided treatment planning for paediatric cancer patients: a simulation study of proton and conventional photon therapy

    DEFF Research Database (Denmark)

    Kornerup, Josefine S.; Brodin, N. P.; Bjork-Eriksson, T.

    2015-01-01

    ) and estimated risk of secondary cancer (SC). RESULTS: Considerable deviations between CT- and PET/CT-guided target volumes were seen in 3 out of the 11 patients studied. However, averaging over the whole cohort, CT or PET/CT guidance introduced no significant difference in the shape or size of the target...... or decreasing irradiated volumes, suggesting that the long-term morbidity of RT in childhood would on average remain largely unaffected. ADVANCES IN KNOWLEDGE: (18)F-FDG PET-based RT planning does not systematically change NTCP or SC risk for paediatric cancer patients compared with CT only. 3 out of 11...... patients had a distinct change of target volumes when PET-guided planning was introduced. Dice and mismatch metrics are not sufficient to assess the consequences of target volume differences in the context of RT....

  15. Improving advance care planning for English-speaking and Spanish-speaking older adults: study protocol for the PREPARE randomised controlled trial

    Science.gov (United States)

    Sudore, Rebecca L; Barnes, Deborah E; Le, Gem M; Ramos, Roberto; Osua, Stacy J; Richardson, Sarah A; Boscardin, John; Schillinger, Dean

    2016-01-01

    Introduction Advance care planning (ACP) is a process that allows patients to identify their goals for medical care. Traditionally, ACP has focused on completing advance directives; however, we have expanded the ACP paradigm to also prepare patients to communicate their wishes and make informed decisions. To this end, we created an ACP website called PREPARE (http://www.prepareforyourcare.org) to prepare diverse English-speaking and Spanish-speaking older adults for medical decision-making. Here, we describe the study protocol for a randomised controlled efficacy trial of PREPARE in a safety-net setting. The goal is to determine the efficacy of PREPARE to engage diverse English-speaking and Spanish-speaking older adults in a full spectrum of ACP behaviours. Methods and analysis We include English-speaking and Spanish-speaking adults from an urban public hospital who are ≥55 years old, have ≥2 chronic medical conditions and have seen a primary care physician ≥2 times in the last year. Participants are randomised to the PREPARE intervention (review PREPARE and an easy-to-read advance directive) or the control arm (only the easy-to-read advance directive). The primary outcome is documentation of an advance directive and/or ACP discussion. Secondary outcomes include ACP behaviour change processes measured with validated surveys (eg, self-efficacy, readiness) and a broad range of ACP actions (eg, choosing a surrogate, identifying goals for care, discussing ACP with clinicians and/or surrogates). Using blinded outcome ascertainment, outcomes will be measured at 1 week and at 3, 6 and 12 months, and compared between study arms using mixed-effects logistic regression and mixed-effects linear, Poisson or negative binomial regression. Ethics and dissemination This study has been approved by the appropriate Institutional Review Boards and is guided by input from patient and clinical advisory boards and a data safety monitoring board. The results of this study will

  16. 77 FR 60718 - Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan and...

    Science.gov (United States)

    2012-10-04

    ... above is currently not available for sale under the 1980 CDCA Plan as amended, and a plan amendment is required to process a direct sale. This plan amendment will be limited to an analysis of whether the public...; CACA-53705] Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan...

  17. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Science.gov (United States)

    2013-07-18

    ... integrated into the entire planning process, from preparing the pre-plan to implementation and monitoring; 17... allocations for these lands. Considering wilderness characteristics in the land use planning process may... impacts on Indian trust assets and potential impacts to cultural resources, will be given due...

  18. Cost Control Guide For Decommissioning Of Nuclear Installations

    International Nuclear Information System (INIS)

    2013-01-01

    This cost control guide was prepared in response to the request from the OECD/NEA Working Party on Decommissioning and Dismantling (WPDD) - Decommissioning Cost Estimation Group (DCEG) to offer the industry guidance in preparing and implementing cost and schedule controls during decommissioning. The DCEG sent out a survey questionnaire in 2010 soliciting comments from OECD member states on their use of cost controls during decommissioning. While the response was limited, the consensus was to proceed with the preparation of this guide. Cost and schedule control systems have been in use for more than 30 years, and in the last 10 years or so have evolved into a more formalised earned value management system (EVMS). This guide is based on the internationally recognised standard, Earned Value Management Systems (ANSI, 2007). The EVMS is built on a work breakdown structure (WBS) of decommissioning activities, and a defined process for controlling a project. The EVMS not only provides measurement of project status and future performance, but also builds a structure and culture for accountability on project performance. This guide describes the performance metrics used to determine the value earned based on what was planned to be done, what was actually accomplished and what it actually cost. Variances measured monthly at a minimum indicate where potential problems are arising and raise a flag for the project manager to implement corrective actions for the next reporting period. The success of the EVMS programme depends on management commitment to implement a culture change for its employees, and to impose the EVMS on potential future contractors performing decommissioning work at a facility. Formal training is required to ensure all elements of the process are understood and put into action. It is recommended to begin with a small project, and graduate to larger projects as the staff learns how to use the system. The EVMS process has been used internationally for small

  19. Plans, Patterns, and Move Categories Guiding a Highly Selective Search

    Science.gov (United States)

    Trippen, Gerhard

    In this paper we present our ideas for an Arimaa-playing program (also called a bot) that uses plans and pattern matching to guide a highly selective search. We restrict move generation to moves in certain move categories to reduce the number of moves considered by the bot significantly. Arimaa is a modern board game that can be played with a standard Chess set. However, the rules of the game are not at all like those of Chess. Furthermore, Arimaa was designed to be as simple and intuitive as possible for humans, yet challenging for computers. While all established Arimaa bots use alpha-beta search with a variety of pruning techniques and other heuristics ending in an extensive positional leaf node evaluation, our new bot, Rat, starts with a positional evaluation of the current position. Based on features found in the current position - supported by pattern matching using a directed position graph - our bot Rat decides which of a given set of plans to follow. The plan then dictates what types of moves can be chosen. This is another major difference from bots that generate "all" possible moves for a particular position. Rat is only allowed to generate moves that belong to certain categories. Leaf nodes are evaluated only by a straightforward material evaluation to help avoid moves that lose material. This highly selective search looks, on average, at only 5 moves out of 5,000 to over 40,000 possible moves in a middle game position.

  20. Opening end-of-life discussions: how to introduce Voicing My CHOiCES™, an advance care planning guide for adolescents and young adults.

    Science.gov (United States)

    Zadeh, Sima; Pao, Maryland; Wiener, Lori

    2015-06-01

    Each year, more than 11,000 adolescents and young adults (AYAs), aged 15-34, die from cancer and other life-threatening conditions. In order to facilitate the transition from curative to end-of-life (EoL) care, it is recommended that EoL discussions be routine, begin close to the time of diagnosis, and continue throughout the illness trajectory. However, due largely to discomfort with the topic of EoL and how to approach the conversation, healthcare providers have largely avoided these discussions. We conducted a two-phase study through the National Cancer Institute with AYAs living with cancer or pediatric HIV to assess AYA interest in EoL planning and to determine in which aspects of EoL planning AYAs wanted to participate. These results provided insight regarding what EoL concepts were important to AYAs, as well as preferences in terms of content, design, format, and style. The findings from this research led to the development of an age-appropriate advance care planning guide, Voicing My CHOiCES™. Voicing My CHOiCES™: An Advanced Care Planning Guide for AYA became available in November 2012. This manuscript provides guidelines on how to introduce and utilize an advance care planning guide for AYAs and discusses potential barriers. Successful use of Voicing My CHOiCES™ will depend on the comfort and skills of the healthcare provider. The present paper is intended to introduce the guide to providers who may utilize it as a resource in their practice, including physicians, nurses, social workers, chaplains, psychiatrists, and psychologists. We suggest guidelines on how to: incorporate EoL planning into the practice setting, identify timepoints at which a patient's goals of care are discussed, and address how to empower the patient and incorporate the family in EoL planning. Recommendations for introducing Voicing My CHOiCES™ and on how to work through each section alongside the patient are provided.

  1. Provider Tools for Advance Care Planning and Goals of Care Discussions: A Systematic Review.

    Science.gov (United States)

    Myers, Jeff; Cosby, Roxanne; Gzik, Danusia; Harle, Ingrid; Harrold, Deb; Incardona, Nadia; Walton, Tara

    2018-01-01

    Advance care planning and goals of care discussions involve the exploration of what is most important to a person, including their values and beliefs in preparation for health-care decision-making. Advance care planning conversations focus on planning for future health care, ensuring that an incapable person's wishes are known and can guide the person's substitute decision maker for future decision-making. Goals of care discussions focus on preparing for current decision-making by ensuring the person's goals guide this process. To provide evidence regarding tools and/or practices available for use by health-care providers to effectively facilitate advance care planning conversations and/or goals of care discussions. A systematic review was conducted focusing on guidelines, randomized trials, comparative studies, and noncomparative studies. Databases searched included MEDLINE, EMBASE, and the proceedings of the International Advance Care Planning Conference and the American Society of Clinical Oncology Palliative Care Symposium. Although several studies report positive findings, there is a lack of consistent patient outcome evidence to support any one clinical tool for use in advance care planning or goals of care discussions. Effective advance care planning conversations at both the population and the individual level require provider education and communication skill development, standardized and accessible documentation, quality improvement initiatives, and system-wide coordination to impact the population level. There is a need for research focused on goals of care discussions, to clarify the purpose and expected outcomes of these discussions, and to clearly differentiate goals of care from advance care planning.

  2. A DVH-guided IMRT optimization algorithm for automatic treatment planning and adaptive radiotherapy replanning

    International Nuclear Information System (INIS)

    Zarepisheh, Masoud; Li, Nan; Long, Troy; Romeijn, H. Edwin; Tian, Zhen; Jia, Xun; Jiang, Steve B.

    2014-01-01

    Purpose: To develop a novel algorithm that incorporates prior treatment knowledge into intensity modulated radiation therapy optimization to facilitate automatic treatment planning and adaptive radiotherapy (ART) replanning. Methods: The algorithm automatically creates a treatment plan guided by the DVH curves of a reference plan that contains information on the clinician-approved dose-volume trade-offs among different targets/organs and among different portions of a DVH curve for an organ. In ART, the reference plan is the initial plan for the same patient, while for automatic treatment planning the reference plan is selected from a library of clinically approved and delivered plans of previously treated patients with similar medical conditions and geometry. The proposed algorithm employs a voxel-based optimization model and navigates the large voxel-based Pareto surface. The voxel weights are iteratively adjusted to approach a plan that is similar to the reference plan in terms of the DVHs. If the reference plan is feasible but not Pareto optimal, the algorithm generates a Pareto optimal plan with the DVHs better than the reference ones. If the reference plan is too restricting for the new geometry, the algorithm generates a Pareto plan with DVHs close to the reference ones. In both cases, the new plans have similar DVH trade-offs as the reference plans. Results: The algorithm was tested using three patient cases and found to be able to automatically adjust the voxel-weighting factors in order to generate a Pareto plan with similar DVH trade-offs as the reference plan. The algorithm has also been implemented on a GPU for high efficiency. Conclusions: A novel prior-knowledge-based optimization algorithm has been developed that automatically adjust the voxel weights and generate a clinical optimal plan at high efficiency. It is found that the new algorithm can significantly improve the plan quality and planning efficiency in ART replanning and automatic treatment

  3. Guide to the periodic inspection of nuclear reactor steel pressure vessels

    International Nuclear Information System (INIS)

    1969-01-01

    This Guide is intended to provide general information and guidance to reactor owners or operators, inspection authorities, certifying authorities or regulatory bodies who are responsible for establishing inspection procedures for specific reactors or reactor types, and for the preparation of national codes or standards. The recommendations of the Guide apply primarily to water-cooled steel reactor vessels which are at a sufficiently early stage of design so that recommendations to provide accessibility for inspection can be incorporated into the early stages of design and inspection planning. However, much of the contents of the Guide are also applicable in part to vessels for other reactor types, such as gas-cooled, pressure-tube, or liquid-metal-cooled reactors, and also to some existing water-cooled reactors and reactors which are in advanced stage of design or construction. 46 refs, figs, 1 tab

  4. 78 FR 75843 - Pacific Halibut Fisheries; Catch Sharing Plan for Guided Sport and Commercial Fisheries in Alaska

    Science.gov (United States)

    2013-12-12

    ... balance the differing needs of the charter and commercial sectors over a wide range of halibut abundance... Plan for Guided Sport and Commercial Fisheries in Alaska; Final Rule #0;#0;Federal Register / Vol. 78... and Commercial Fisheries in Alaska AGENCY: National Marine Fisheries Service (NMFS), National Oceanic...

  5. Facility effluent monitoring plan for the Waste Receiving and Processing Facility Module 1

    International Nuclear Information System (INIS)

    Lewis, C.J.

    1995-10-01

    A facility effluent monitoring plan is required by the US Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal state, and local requirements. This facility effluent monitoring plan shall ensure lonq-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  6. Getting Started with Market Research for Out-of-School Time Planning: A Resource Guide for Communities

    Science.gov (United States)

    Pokela, Julianne; Steblea, Ingrid; Shea, Linda; Denny, Elizabeth

    2007-01-01

    Conducting market research for out-of-school-time planning can replace assumptions with facts, give kids and parents a voice to express their needs and preferences, and help build stakeholder buy-in and support. This practical guide shows community leaders, policymakers and out-of-school-time practitioners how to use market research to make more…

  7. Sampling a guide for internal auditors

    CERN Document Server

    Apostolou, Barbara

    2004-01-01

    While it is possible to examine 100 percent of an audit customer's data, the time and cost associated with such a study are often prohibitive. To obtain sufficient, reliable, and relevant information with a limited data set, sampling is an efficient and effective tool. It can help you evaluate the customer's assertions, as well as reach audit conclusions and provide reasonable assurance to your organization. This handbook will help you understand sampling. It also serves as a guide for auditors and students preparing for certification. Topics include: An overview of sampling. Statistical and nonstatistical sampling issues. Sampling selection methods and risks. The pros and cons of popular sampling plans.

  8. Facility Effluent Monitoring Plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Carter, G.J.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updates as a minimum every three years

  9. Gaze strategies during visually-guided versus memory-guided grasping.

    Science.gov (United States)

    Prime, Steven L; Marotta, Jonathan J

    2013-03-01

    Vision plays a crucial role in guiding motor actions. But sometimes we cannot use vision and must rely on our memory to guide action-e.g. remembering where we placed our eyeglasses on the bedside table when reaching for them with the lights off. Recent studies show subjects look towards the index finger grasp position during visually-guided precision grasping. But, where do people look during memory-guided grasping? Here, we explored the gaze behaviour of subjects as they grasped a centrally placed symmetrical block under open- and closed-loop conditions. In Experiment 1, subjects performed grasps in either a visually-guided task or memory-guided task. The results show that during visually-guided grasping, gaze was first directed towards the index finger's grasp point on the block, suggesting gaze targets future grasp points during the planning of the grasp. Gaze during memory-guided grasping was aimed closer to the blocks' centre of mass from block presentation to the completion of the grasp. In Experiment 2, subjects performed an 'immediate grasping' task in which vision of the block was removed immediately at the onset of the reach. Similar to the visually-guided results from Experiment 1, gaze was primarily directed towards the index finger location. These results support the 2-stream theory of vision in that motor planning with visual feedback at the onset of the movement is driven primarily by real-time visuomotor computations of the dorsal stream, whereas grasping remembered objects without visual feedback is driven primarily by the perceptual memory representations mediated by the ventral stream.

  10. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  11. Wind turbine integration guide : towards a new landscape; Guide d'integration des eoliennes au territoire : vers de nouveaux paysages

    Energy Technology Data Exchange (ETDEWEB)

    Boucher, I.; Blais, P. [Quebec Ministere des Affaires Municipales et des Regions, Quebec, PQ (Canada)

    2007-07-01

    Many areas of Quebec have significant wind potential and the province has power infrastructure that allow easy connection of wind power to the electricity grid. As such, wind energy development is occurring in Quebec as part of its sustainable development strategy. Although wind power is a sustainable option, it should not interfere with the aesthetics of local landscapes. Both regional and local municipalities are faced with the challenge of planning wind farms while protecting the tourism industry and maintaining landscapes of interest, including natural and historic sites. This guide was prepared to support wind energy development in a manner that protects local landscapes. It includes examples where wind turbine arrays have been installed in harmony with the environment. It also described existing tools that enable wind turbine site planning through site characterization. This guide also allows the Ministry of Natural Resources to accompany promoters during project planning and evaluate the impact of a project on the landscape. All proposed projects are subject to conditions imposed by regional municipalities, which have jurisdiction over landscape, noise, public safety, and wildlife. Project proponents must meet both social and environmental criteria to ensure the preservation of the municipal territory and the quality of life. Regulations are in place to ensure economic development occurs in tandem with meeting the energy needs of local and regional communities. 31 refs., 1 tabs., 21 figs.

  12. Guide for disposition of radioactive-material sources

    International Nuclear Information System (INIS)

    Taylor, J.M.; Selby, J.M.

    1983-04-01

    This guide has been prepared to assist DOE Energy Technology Centers in disposing of radioactive-material sources. The guide describes the steps and requirements necessary to dispose of unwanted sources. The steps include obtaining approvals, source characterization, source disposition, packaging requirements, and shipment preparation. A flow chart is provided in the guide to assist the user in the necessary sequential steps of source disposition

  13. Co-operative development of nuclear safety regulations, guides and standards based on NUSS

    International Nuclear Information System (INIS)

    Pachner, J.; Boyd, F.C.; Yaremy, E.M.

    1985-01-01

    A major need of developing Member States building nuclear power plants (NPPs) of foreign origin is to acquire a capability to regulate such nuclear plants independently. Among other things, this requires the development of national nuclear safety regulations, guides and standards to govern the development and use of nuclear technology. Recognizing the importance and complexity of this task, it seems appropriate that the NPP-exporting Member States share their experience and assist the NPP-importing Member States in the development of their national regulations and guides. In 1983, the Atomic Energy Control Board and Atomic Energy of Canada Ltd. conducted a study of a possible joint programme involving Canada, an NPP-importing Member State and the IAEA for the development of the national nuclear safety regulations and guides based on NUSS documents. During the study, a work plan with manpower estimates for the development of design regulations, safety guides and a guide for regulatory evaluation of design was prepared as an investigatory exercise. The work plan suggests that a successful NUSS implementation in developing Member States will require availability of significant resources at the start of the programme. The study showed that such a joint programme could provide an effective mechanism for transfer of nuclear safety know-how to the developing Member States through NUSS implementation. (author)

  14. Pocket Spending Guide

    OpenAIRE

    Poff, Karen

    2015-01-01

    Provides an example for how to set up a pocket spending guide. By filling out the guide and keeping it with you, you can easily see at any time how much money you have available to spend in each category. A pocket spending guide will help you adjust your spending plan to make your money go where you really want it to go.

  15. Using Herbs and Spices/Preparing Sauces and Gravies. Learning Activity Pack and Instructor's Guide 5.11. Commercial Foods and Culinary Arts Competency-Based Series. Section 5: Basic Food Preparation.

    Science.gov (United States)

    Florida State Univ., Tallahassee. Center for Studies in Vocational Education.

    This document consists of a learning activity packet (LAP) for the student and an instructor's guide for the teacher. The LAP is intended to acquaint occupational home economics students with herbs and spices and the selection and preparation of sauces and gravies. Illustrated information sheets and learning activities are provided in these areas:…

  16. 3D artificial bones for bone repair prepared by computed tomography-guided fused deposition modeling for bone repair.

    Science.gov (United States)

    Xu, Ning; Ye, Xiaojian; Wei, Daixu; Zhong, Jian; Chen, Yuyun; Xu, Guohua; He, Dannong

    2014-09-10

    The medical community has expressed significant interest in the development of new types of artificial bones that mimic natural bones. In this study, computed tomography (CT)-guided fused deposition modeling (FDM) was employed to fabricate polycaprolactone (PCL)/hydroxyapatite (HA) and PCL 3D artificial bones to mimic natural goat femurs. The in vitro mechanical properties, in vitro cell biocompatibility, and in vivo performance of the artificial bones in a long load-bearing goat femur bone segmental defect model were studied. All of the results indicate that CT-guided FDM is a simple, convenient, relatively low-cost method that is suitable for fabricating natural bonelike artificial bones. Moreover, PCL/HA 3D artificial bones prepared by CT-guided FDM have more close mechanics to natural bone, good in vitro cell biocompatibility, biodegradation ability, and appropriate in vivo new bone formation ability. Therefore, PCL/HA 3D artificial bones could be potentially be of use in the treatment of patients with clinical bone defects.

  17. CISO's guide to penetration testing a framework to plan, manage, and maximize benefits

    CERN Document Server

    Tiller, James S

    2011-01-01

    CISO's Guide to Penetration Testing: A Framework to Plan, Manage, and Maximize Benefits details the methodologies, framework, and unwritten conventions penetration tests should cover to provide the most value to your organization and your customers. Discussing the process from both a consultative and technical perspective, it provides an overview of the common tools and exploits used by attackers along with the rationale for why they are used. From the first meeting to accepting the deliverables and knowing what to do with the results, James Tiller explains what to expect from all phases of th

  18. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  19. Advanced Energy Retrofit Guide Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guopeng; Liu, Bing; Wang, Weimin; Zhang, Jian; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

    2011-09-27

    The Advanced Energy Retrofit Guide for Office Buildings is a component of the Department of Energy’s Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

  20. Advanced Energy Retrofit Guide Retail Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guopeng; Liu, Bing; Zhang, Jian; Wang, Weimin; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

    2011-09-19

    The Advanced Energy Retrofit Guide for Retail Buildings is a component of the Department of Energy’s Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

  1. 40 CFR 112.3 - Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan.

    Science.gov (United States)

    2010-07-01

    ... § 112.1(b), you must prepare and implement a Plan within six months after you begin operations. (c) If... per day, or at the nearest field office if the facility is not so attended, and (2) Have the Plan... discharges as described in § 112.1(b) that are the result of natural disasters, acts of war, or terrorism...

  2. Precision IORT - Image guided intraoperative radiation therapy (igIORT) using online treatment planning including tissue heterogeneity correction.

    Science.gov (United States)

    Schneider, Frank; Bludau, Frederic; Clausen, Sven; Fleckenstein, Jens; Obertacke, Udo; Wenz, Frederik

    2017-05-01

    To the present date, IORT has been eye and hand guided without treatment planning and tissue heterogeneity correction. This limits the precision of the application and the precise documentation of the location and the deposited dose in the tissue. Here we present a set-up where we use image guidance by intraoperative cone beam computed tomography (CBCT) for precise online Monte Carlo treatment planning including tissue heterogeneity correction. An IORT was performed during balloon kyphoplasty using a dedicated Needle Applicator. An intraoperative CBCT was registered with a pre-op CT. Treatment planning was performed in Radiance using a hybrid Monte Carlo algorithm simulating dose in homogeneous (MCwater) and heterogeneous medium (MChet). Dose distributions on CBCT and pre-op CT were compared with each other. Spinal cord and the metastasis doses were evaluated. The MCwater calculations showed a spherical dose distribution as expected. The minimum target dose for the MChet simulations on pre-op CT was increased by 40% while the maximum spinal cord dose was decreased by 35%. Due to the artefacts on the CBCT the comparison between MChet simulations on CBCT and pre-op CT showed differences up to 50% in dose. igIORT and online treatment planning improves the accuracy of IORT. However, the current set-up is limited by CT artefacts. Fusing an intraoperative CBCT with a pre-op CT allows the combination of an accurate dose calculation with the knowledge of the correct source/applicator position. This method can be also used for pre-operative treatment planning followed by image guided surgery. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  3. Autonomous guided vehicles methods and models for optimal path planning

    CERN Document Server

    Fazlollahtabar, Hamed

    2015-01-01

      This book provides readers with extensive information on path planning optimization for both single and multiple Autonomous Guided Vehicles (AGVs), and discusses practical issues involved in advanced industrial applications of AGVs. After discussing previously published research in the field and highlighting the current gaps, it introduces new models developed by the authors with the goal of reducing costs and increasing productivity and effectiveness in the manufacturing industry. The new models address the increasing complexity of manufacturing networks, due for example to the adoption of flexible manufacturing systems that involve automated material handling systems, robots, numerically controlled machine tools, and automated inspection stations, while also considering the uncertainty and stochastic nature of automated equipment such as AGVs. The book discusses and provides solutions to important issues concerning the use of AGVs in the manufacturing industry, including material flow optimization with A...

  4. College Choices Guide for Migrant Students and Parents = Guia de Elecciones de Universidades para Estudiantes Migrantes y sus Padres.

    Science.gov (United States)

    Eddy/Northeast Health, Troy, NY.

    This brief guide is a planning outline to help migrant students and parents prepare for, choose, and apply to college. The first section, "Thinking About College," offers specific tips for each grade from 9-12; discusses high school graduation requirements and college admission requirements, using Johnston County (North Carolina) schools and the…

  5. Guide to data preparation for EQ3/6 (Wolery) modified for the IBM 3033

    International Nuclear Information System (INIS)

    Noy, D.J.

    1981-11-01

    The ability to predict mineral-fluid equilibria is an important aspect of geochemical research into radioactive waste disposal. The interaction of ground waters and waste leachates with the host rock of a disposal site, either at elevated or ambient temperatures, will influence the performance of the disposal system. The EQ3/6 package (Wolery, 1979) provides a technique for the prediction of such interactions using available thermodynamic data, and for extrapolating laboratory experimental data on rock-fluid equilibria. This report describes the modifications performed on this package to allow operation on an IBM machine, and is intended as a guide to data preparation for the programmes. (author)

  6. Guide for the preparation of applications for licenses for the use of sealed sources in portable gauging devices

    International Nuclear Information System (INIS)

    1985-01-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of sealed sources in portable gauging devices. An example of a portable gauging device is a moisture-density gauge that contains a gamma-emitting sealed source, cesium-137, and a sealed neutron source, americium-242-beryllium

  7. 76 FR 70162 - Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To...

    Science.gov (United States)

    2011-11-10

    ... whether the Sun Valley Management Framework Plan should be amended to address the sale. To the extent... sale. This notice initiates the public scoping process for the plan amendment and associated EA. The...] Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To Provide...

  8. Guide of Black granite prospect ion for the department of Florida

    International Nuclear Information System (INIS)

    Bossi, J.; Campal, N.

    1989-01-01

    The black granite prospection project is between the government of Canada and Uruguay agreement (Facultad de Agronomia - Universidad de la Republica). The main objective is the location and mapping of black granite veins to obtain potential deposits. The study of the relations between surface and deep features of these veins. The preparation of a guide to exploration and exploitation plan for mining companies. Reinforce the capacity of research in economic geology as well as increasing the exports by resources jobs

  9. Facility effluent monitoring plan for K area spent fuel storage basin

    International Nuclear Information System (INIS)

    Hunacek, G.S.

    1996-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity of the effluent monitoring system shall be ensured with updates of this report whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  10. Guide for radiological characterization and measurements for decommissioning of US Department of Energy surplus facilities

    International Nuclear Information System (INIS)

    Denahm, D.H.; Barnes, M.G.; Jaquish, R.E.; Corley, J.P.; Gilbert, R.O.; Hoenes, G.R.; Jamison, J.D.; McMurray, B.J.; Watson, E.C.

    1983-08-01

    This Guide describes the elements of radiological characterization at DOE excess facilities in preparation for, during, and subsequent to decommissioning operations. It is the intent of this Guide and accompanying appendices to provide the reader (user) with sufficient information to carry out that task with a minimum of confusion and to provide a uniform basis for evaluating site conditions and verifying that decommissioning operations are conducted according to a specific plan. Some areas of particular interest in this Guide are: the need to involve appropriate staff from the affected states in the early planning stages of decommissioning; the need for and suggested methods of radiological site characterization to complete a decommissioning project, including: historical surveys, environmental pathway analyses, statistical sampling design, and choosing appropriate instrumentation and measurements; the need for and emphasis on quality assurance, documentation and records retention; the establishment of a Design Objective approach to applying site-specific contamination limits based on the ALARA philosophy; the establishment of a ''de minimis'' or minimum dose level of concern for decommissioning operations based on existing standards, experience and ALARA considerations

  11. Beam’s-eye-view dosimetrics (BEVD) guided rotational station parameter optimized radiation therapy (SPORT) planning based on reweighted total-variation minimization

    Science.gov (United States)

    Kim, Hojin; Li, Ruijiang; Lee, Rena; Xing, Lei

    2015-03-01

    Conventional VMAT optimizes aperture shapes and weights at uniformly sampled stations, which is a generalization of the concept of a control point. Recently, rotational station parameter optimized radiation therapy (SPORT) has been proposed to improve the plan quality by inserting beams to the regions that demand additional intensity modulations, thus formulating non-uniform beam sampling. This work presents a new rotational SPORT planning strategy based on reweighted total-variation (TV) minimization (min.), using beam’s-eye-view dosimetrics (BEVD) guided beam selection. The convex programming based reweighted TV min. assures the simplified fluence-map, which facilitates single-aperture selection at each station for single-arc delivery. For the rotational arc treatment planning and non-uniform beam angle setting, the mathematical model needs to be modified by additional penalty term describing the fluence-map similarity and by determination of appropriate angular weighting factors. The proposed algorithm with additional penalty term is capable of achieving more efficient and deliverable plans adaptive to the conventional VMAT and SPORT planning schemes by reducing the dose delivery time about 5 to 10 s in three clinical cases (one prostate and two head-and-neck (HN) cases with a single and multiple targets). The BEVD guided beam selection provides effective and yet easy calculating methodology to select angles for denser, non-uniform angular sampling in SPORT planning. Our BEVD guided SPORT treatment schemes improve the dose sparing to femoral heads in the prostate and brainstem, parotid glands and oral cavity in the two HN cases, where the mean dose reduction of those organs ranges from 0.5 to 2.5 Gy. Also, it increases the conformation number assessing the dose conformity to the target from 0.84, 0.75 and 0.74 to 0.86, 0.79 and 0.80 in the prostate and two HN cases, while preserving the delivery efficiency, relative to conventional single-arc VMAT plans.

  12. Beam’s-eye-view dosimetrics (BEVD) guided rotational station parameter optimized radiation therapy (SPORT) planning based on reweighted total-variation minimization

    International Nuclear Information System (INIS)

    Kim, Hojin; Li, Ruijiang; Xing, Lei; Lee, Rena

    2015-01-01

    Conventional VMAT optimizes aperture shapes and weights at uniformly sampled stations, which is a generalization of the concept of a control point. Recently, rotational station parameter optimized radiation therapy (SPORT) has been proposed to improve the plan quality by inserting beams to the regions that demand additional intensity modulations, thus formulating non-uniform beam sampling. This work presents a new rotational SPORT planning strategy based on reweighted total-variation (TV) minimization (min.), using beam’s-eye-view dosimetrics (BEVD) guided beam selection. The convex programming based reweighted TV min. assures the simplified fluence-map, which facilitates single-aperture selection at each station for single-arc delivery. For the rotational arc treatment planning and non-uniform beam angle setting, the mathematical model needs to be modified by additional penalty term describing the fluence-map similarity and by determination of appropriate angular weighting factors. The proposed algorithm with additional penalty term is capable of achieving more efficient and deliverable plans adaptive to the conventional VMAT and SPORT planning schemes by reducing the dose delivery time about 5 to 10 s in three clinical cases (one prostate and two head-and-neck (HN) cases with a single and multiple targets). The BEVD guided beam selection provides effective and yet easy calculating methodology to select angles for denser, non-uniform angular sampling in SPORT planning. Our BEVD guided SPORT treatment schemes improve the dose sparing to femoral heads in the prostate and brainstem, parotid glands and oral cavity in the two HN cases, where the mean dose reduction of those organs ranges from 0.5 to 2.5 Gy. Also, it increases the conformation number assessing the dose conformity to the target from 0.84, 0.75 and 0.74 to 0.86, 0.79 and 0.80 in the prostate and two HN cases, while preserving the delivery efficiency, relative to conventional single-arc VMAT plans

  13. 32 CFR 2001.15 - Classification guides.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Classification guides. 2001.15 Section 2001.15..., NATIONAL ARCHIVES AND RECORDS ADMINISTRATION CLASSIFIED NATIONAL SECURITY INFORMATION Classification § 2001.15 Classification guides. (a) Preparation of classification guides. Originators of classification...

  14. Mental and Active Preparation: Examining Variations in Women's Processes of Preparing to Leave Abusive Relationships.

    Science.gov (United States)

    Bermea, Autumn M; Khaw, Lyndal; Hardesty, Jennifer L; Rosenbloom, Lindsay; Salerno, Craig

    2017-02-01

    Although the process of leaving abusive relationships has received increased research attention, preparing to leave is still largely understudied. Despite an emphasis on safety planning, not all women take active steps to prepare, and the characteristics and experiences of those who do or do not actively prepare are unknown. We address this gap with a secondary data analysis of interviews with 25 abused mothers in the process of leaving. All women initially engaged in mental planning, where they had emotionally disconnected from their partners. Using constructivist grounded theory techniques, we identified two distinct groups: those whose mental planning led to active planning ( n = 11), and those who moved directly from mental planning to leaving ( n = 14) with little time or need to actively plan. The groups differed on several individual, relationship, and child factors, which may have impacted the ability or decisions to prepare. This study supports the feminist view that survivors are not helpless victims but active agents who strategize for safety. Those who engage solely in mental planning still prepare to leave, even if they do not engage in active planning. Practitioners should consider factors affecting preparations and acknowledge mental planning as a necessary effort in leaving.

  15. A fast inverse treatment planning strategy facilitating optimized catheter selection in image-guided high-dose-rate interstitial gynecologic brachytherapy.

    Science.gov (United States)

    Guthier, Christian V; Damato, Antonio L; Hesser, Juergen W; Viswanathan, Akila N; Cormack, Robert A

    2017-12-01

    Interstitial high-dose rate (HDR) brachytherapy is an important therapeutic strategy for the treatment of locally advanced gynecologic (GYN) cancers. The outcome of this therapy is determined by the quality of dose distribution achieved. This paper focuses on a novel yet simple heuristic for catheter selection for GYN HDR brachytherapy and their comparison against state of the art optimization strategies. The proposed technique is intended to act as a decision-supporting tool to select a favorable needle configuration. The presented heuristic for catheter optimization is based on a shrinkage-type algorithm (SACO). It is compared against state of the art planning in a retrospective study of 20 patients who previously received image-guided interstitial HDR brachytherapy using a Syed Neblett template. From those plans, template orientation and position are estimated via a rigid registration of the template with the actual catheter trajectories. All potential straight trajectories intersecting the contoured clinical target volume (CTV) are considered for catheter optimization. Retrospectively generated plans and clinical plans are compared with respect to dosimetric performance and optimization time. All plans were generated with one single run of the optimizer lasting 0.6-97.4 s. Compared to manual optimization, SACO yields a statistically significant (P ≤ 0.05) improved target coverage while at the same time fulfilling all dosimetric constraints for organs at risk (OARs). Comparing inverse planning strategies, dosimetric evaluation for SACO and "hybrid inverse planning and optimization" (HIPO), as gold standard, shows no statistically significant difference (P > 0.05). However, SACO provides the potential to reduce the number of used catheters without compromising plan quality. The proposed heuristic for needle selection provides fast catheter selection with optimization times suited for intraoperative treatment planning. Compared to manual optimization, the

  16. Intersection planning in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  17. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  18. I and C security audit of nuclear facilities: implementation guide - TAFICS/IG/3

    International Nuclear Information System (INIS)

    2017-05-01

    This document provides guidance to I and C Security audit team to prepare, plan, and execute security audit of Instrumentation and Control (I and C) systems at DAE's nuclear facilities, including I and C system development and manufacturing organisations. The audit is expected to check efficacy of I and C security program - plan, policies, procedures and controls - implemented at a nuclear facility to protect I and C systems from potential cyber attacks. The document contains detailed audit procedures, which specify the audit objectives, audit objects and audit methods for each element of I and C security described in implementation guides promulgated by TAFICS to all DAE Units. (author)

  19. Technical note: CT-guided biopsy of lung masses using an automated guiding apparatus

    International Nuclear Information System (INIS)

    Chellathurai, Amarnath; Kanhirat, Saneej; Chokkappan, Kabilan; Swaminathan, Thiruchendur S; Kulasekaran, Nadhamuni

    2009-01-01

    Automated guiding apparatuses for CT-guided biopsies are now available. We report our experience with an indigenous system to guide lung biopsies. This system gave results similar to those with the manual technique. Automated planning also appears to be technically easier, it requires fewer number of needle passes, consumes less time, and requires fewer number of check scans

  20. PET/CT-guided treatment planning for paediatric cancer patients: a simulation study of proton and conventional photon therapy

    Science.gov (United States)

    Brodin, N P; Björk-Eriksson, T; Birk Christensen, C; Kiil-Berthelsen, A; Aznar, M C; Hollensen, C; Markova, E; Munck af Rosenschöld, P

    2015-01-01

    Objective: To investigate the impact of including fluorine-18 fludeoxyglucose (18F-FDG) positron emission tomography (PET) scanning in the planning of paediatric radiotherapy (RT). Methods: Target volumes were first delineated without and subsequently re-delineated with access to 18F-FDG PET scan information, on duplicate CT sets. RT plans were generated for three-dimensional conformal photon RT (3DCRT) and intensity-modulated proton therapy (IMPT). The results were evaluated by comparison of target volumes, target dose coverage parameters, normal tissue complication probability (NTCP) and estimated risk of secondary cancer (SC). Results: Considerable deviations between CT- and PET/CT-guided target volumes were seen in 3 out of the 11 patients studied. However, averaging over the whole cohort, CT or PET/CT guidance introduced no significant difference in the shape or size of the target volumes, target dose coverage, irradiated volumes, estimated NTCP or SC risk, neither for IMPT nor 3DCRT. Conclusion: Our results imply that the inclusion of PET/CT scans in the RT planning process could have considerable impact for individual patients. There were no general trends of increasing or decreasing irradiated volumes, suggesting that the long-term morbidity of RT in childhood would on average remain largely unaffected. Advances in knowledge: 18F-FDG PET-based RT planning does not systematically change NTCP or SC risk for paediatric cancer patients compared with CT only. 3 out of 11 patients had a distinct change of target volumes when PET-guided planning was introduced. Dice and mismatch metrics are not sufficient to assess the consequences of target volume differences in the context of RT. PMID:25494657

  1. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  2. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  3. A Guide to Curriculum Planning in Global Studies.

    Science.gov (United States)

    Hartoonian, H. Michael; Stock, Hilary

    This guide is designed to assist educators develop curricula to embrace global perspectives. The guide is organized into five sections. The first section provides an overview of global studies, and seeks to answer such questions as "Why study global studies?" and "What does global studies include?" The second section identifys…

  4. Land use planning in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  5. A new method of surgical navigation for orthognathic surgery: optical tracking guided free-hand repositioning of the maxillomandibular complex.

    Science.gov (United States)

    Li, Biao; Zhang, Lei; Sun, Hao; Shen, Steve G F; Wang, Xudong

    2014-03-01

    In bimaxillary orthognathic surgery, the positioning of the maxilla and the mandible is typically accomplished via 2-splint technique, which may be the sources of several types of inaccuracy. To overcome the limitations of the 2-splint technique, we developed a new navigation method, which guided the surgeon to free-hand reposition the maxillomandibular complex as a whole intraoperatively, without the intermediate splint. In this preliminary study, the feasibility was demonstrated. Five patients with dental maxillofacial deformities were enrolled. Before the surgery, 3-dimensional planning was conducted and imported into a navigation system. During the operation, a tracker was connected to the osteotomized maxillomandibular complex via a splint. The navigation system tracked the movement of the complex and displayed it on the screen in real time to guide the surgeon to reposition the complex. The postoperative result was compared with the plan by analyzing the measured distances between the maxillary landmarks and reference planes, as determined from computed tomography data. The mean absolute errors of the maxillary position were clinically acceptable (<1.0 mm). Preoperative preparation time was reduced to 100 minutes on average. All patients were satisfied with the aesthetic results. This navigation method without intraoperative image registration provided a feasible means of transferring virtual planning to the real orthognathic surgery. The real-time position of the maxillomandibular complex was displayed on a monitor to visually guide the surgeon to reposition the complex. In this method, the traditional model surgery and the intermediate splint were discarded, and the preoperative preparation was simplified.

  6. Assessment of occupational exposure due to intakes of radionuclides. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    Occupational exposure due to radioactive materials can occur as a result of various human activities. These include work associated with the different stages of the nuclear fuel cycle, the use of radioactive sources in medicine, scientific research, agriculture and industry, and occupations which involve the handling of materials containing enhanced concentrations of naturally occurring radionuclides. In order to control this exposure, it is necessary to be able to assess the magnitude of the doses involved. Three interrelated Safety Guides, prepared jointly by the IAEA and the International Labour Office (ILO), provide guidance on the application of the requirements of the Basic Safety Standards with respect to occupational exposure. Reference [3] gives general advice on the exposure conditions for which monitoring programmes should be set up to assess radiation doses arising from external radiation and from intakes of radionuclides by workers. More specific guidance on the assessment of doses from external sources of radiation can be found in Ref. [4] and the present Safety Guide deals with intakes of radioactive materials. Recommendations related to occupational radiation protection have also been developed by the International Commission on Radiological Protection (ICRP) [5]. These and other current recommendations of the ICRP [6] have been taken into account in preparing this Safety Guide. The purpose of this Safety Guide is to provide guidance for regulatory authorities on conducting assessments of intakes of radioactive material arising from occupational exposure. This Guide will also be useful to those concerned with the planning, management and operation of occupational monitoring programmes, and to those involved in the design of equipment for use in internal dosimetry and workplace monitoring

  7. Assessment of occupational exposure due to intakes of radionuclides. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    Occupational exposure due to radioactive materials can occur as a result of various human activities. These include work associated with the different stages of the nuclear fuel cycle, the use of radioactive sources in medicine, scientific research, agriculture and industry, and occupations which involve the handling of materials containing enhanced concentrations of naturally occurring radionuclides. In order to control this exposure, it is necessary to be able to assess the magnitude of the doses involved. Three interrelated Safety Guides, prepared jointly by the IAEA and the International Labour Office (ILO), provide guidance on the application of the requirements of the Basic Safety Standards with respect to occupational exposure. Reference [3] gives general advice on the exposure conditions for which monitoring programmes should be set up to assess radiation doses arising from external radiation and from intakes of radionuclides by workers. More specific guidance on the assessment of doses from external sources of radiation can be found in Ref. [4] and the present Safety Guide deals with intakes of radioactive materials. Recommendations related to occupational radiation protection have also been developed by the International Commission on Radiological Protection (ICRP) [5]. These and other current recommendations of the ICRP [6] have been taken into account in preparing this Safety Guide. The purpose of this Safety Guide is to provide guidance for regulatory authorities on conducting assessments of intakes of radioactive material arising from occupational exposure. This Guide will also be useful to those concerned with the planning, management and operation of occupational monitoring programmes, and to those involved in the design of equipment for use in internal dosimetry and workplace monitoring

  8. Assessment of occupational exposure due to intakes of radionuclides. Safety guide

    International Nuclear Information System (INIS)

    2001-01-01

    Occupational exposure due to radioactive materials can occur as a result of various human activities. These include work associated with the different stages of the nuclear fuel cycle, the use of radioactive sources in medicine, scientific research, agriculture and industry, and occupations which involve the handling of materials containing enhanced concentrations of naturally occurring radionuclides. In order to control this exposure, it is necessary to be able to assess the magnitude of the doses involved. Three interrelated Safety Guides, prepared jointly by the IAEA and the International Labour Office (ILO), provide guidance on the application of the requirements of the Basic Safety Standards with respect to occupational exposure. Reference [3] gives general advice on the exposure conditions for which monitoring programmes should be set up to assess radiation doses arising from external radiation and from intakes of radionuclides by workers. More specific guidance on the assessment of doses from external sources of radiation can be found in Ref. [4] and the present Safety Guide deals with intakes of radioactive materials. Recommendations related to occupational radiation protection have also been developed by the International Commission on Radiological Protection (ICRP) [5]. These and other current recommendations of the ICRP [6] have been taken into account in preparing this Safety Guide. The purpose of this Safety Guide is to provide guidance for regulatory authorities on conducting assessments of intakes of radioactive material arising from occupational exposure. This Guide will also be useful to those concerned with the planning, management and operation of occupational monitoring programmes, and to those involved in the design of equipment for use in internal dosimetry and workplace monitoring

  9. Assessment of occupational exposure due to intakes of radionuclides. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    Occupational exposure due to radioactive materials can occur as a result of various human activities. These include work associated with the different stages of the nuclear fuel cycle, the use of radioactive sources in medicine, scientific research, agriculture and industry, and occupations which involve the handling of materials containing enhanced concentrations of naturally occurring radionuclides. In order to control this exposure, it is necessary to be able to assess the magnitude of the doses involved. Three interrelated Safety Guides, prepared jointly by the IAEA and the International Labour Office (ILO), provide guidance on the application of the requirements of the Basic Safety Standards with respect to occupational exposure. Reference [3] gives general advice on the exposure conditions for which monitoring programmes should be set up to assess radiation doses arising from external radiation and from intakes of radionuclides by workers. More specific guidance on the assessment of doses from external sources of radiation can be found in Ref. [4] and the present Safety Guide deals with intakes of radioactive materials. Recommendations related to occupational radiation protection have also been developed by the International Commission on Radiological Protection (ICRP) [5]. These and other current recommendations of the ICRP [6] have been taken into account in preparing this Safety Guide. The purpose of this Safety Guide is to provide guidance for regulatory authorities on conducting assessments of intakes of radioactive material arising from occupational exposure. This Guide will also be useful to those concerned with the planning, management and operation of occupational monitoring programmes, and to those involved in the design of equipment for use in internal dosimetry and workplace monitoring

  10. Assessment of occupational exposure due to intakes of radionuclides. Safety guide

    International Nuclear Information System (INIS)

    1999-01-01

    Occupational exposure due to radioactive materials can occur as a result of various human activities. These include work associated with the different stages of the nuclear fuel cycle, the use of radioactive sources in medicine, scientific research, agriculture and industry, and occupations which involve the handling of materials containing enhanced concentrations of naturally occurring radionuclides. In order to control this exposure, it is necessary to be able to assess the magnitude of the doses involved. Three interrelated Safety Guides, prepared jointly by the IAEA and the International Labour Office (ILO), provide guidance on the application of the requirements of the Basic Safety Standards with respect to occupational exposure. Reference [3] gives general advice on the exposure conditions for which monitoring programmes should be set up to assess radiation doses arising from external radiation and from intakes of radionuclides by workers. More specific guidance on the assessment of doses from external sources of radiation can be found in Ref. [4] and the present Safety Guide deals with intakes of radioactive materials. Recommendations related to occupational radiation protection have also been developed by the International Commission on Radiological Protection (ICRP) [5]. These and other current recommendations of the ICRP [6] have been taken into account in preparing this Safety Guide. The purpose of this Safety Guide is to provide guidance for regulatory authorities on conducting assessments of intakes of radioactive material arising from occupational exposure. This Guide will also be useful to those concerned with the planning, management and operation of occupational monitoring programmes, and to those involved in the design of equipment for use in internal dosimetry and workplace monitoring

  11. Standard guide for preparing and interpreting precision and bias statements in test method standards used in the nuclear industry

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1992-01-01

    1.1 This guide covers terminology useful for the preparation and interpretation of precision and bias statements. 1.2 In formulating precision and bias statements, it is important to understand the statistical concepts involved and to identify the major sources of variation that affect results. Appendix X1 provides a brief summary of these concepts. 1.3 To illustrate the statistical concepts and to demonstrate some sources of variation, a hypothetical data set has been analyzed in Appendix X2. Reference to this example is made throughout this guide. 1.4 It is difficult and at times impossible to ship nuclear materials for interlaboratory testing. Thus, precision statements for test methods relating to nuclear materials will ordinarily reflect only within-laboratory variation.

  12. Federal guide for a radiological response: Supporting the Nuclear Regulatory Commission during the initial hours of a serious accident

    International Nuclear Information System (INIS)

    Hogan, R.T.

    1993-11-01

    This document is a planning guide for those Federal agencies that work with the Nuclear Regulatory commission (NRC) during the initial hours of response to a serious radiological emergency in which the NRC is the Lead Federal Agency (LFA). These Federal agencies are: DOE, EPA, USDA, HHS, NOAA, and FEMA. This guide is intended to help these agencies prepare for a prompt response. Instructions are provided on receiving the initial notification, the type of person to send to the scene, the facility at which people are needed, how to get them to that facility, and what they should do when they arrive. Federal agencies not specifically mentioned in this guide may also be asked to support the NRC

  13. NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services

    Science.gov (United States)

    Johnsen, Susan K., Ed.

    2012-01-01

    The new Pre-K-Grade 12 Gifted Education Programming Standards should be part of every school district's repertoire of standards to ensure that the learning needs of advanced students are being met. "NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services" details six standards that…

  14. Integrated resource planning and the environment: A guide to the use of multi-criteria decision methods

    Energy Technology Data Exchange (ETDEWEB)

    Hobbs, B.F.; Meier, P. [IDEA, Inc., Washington, DC (United States)

    1994-07-01

    This report is intended as a guide to the use of multi-criteria decision-making methods (MCDM) for incorporating environmental factors in electric utility integrated resource planning (IRP). Application of MCDM is emerging as an alternative and complementary method to explicit economic valuation for weighting environmental effects. We provide a step-by-step guide to the elements that are common to all MCDM applications. The report discusses how environmental attributes should be selected and defined; how options should be selected (and how risk and uncertainty should be accounted for); how environmental impacts should be quantified (with particular attention to the problems of location); how screening should be conducted; the construction and analysis of trade-off curves; dominance analysis, which seeks to identify clearly superior options, and reject clearly inferior options; scaling of impacts, in which we translate social, economic and environmental impacts into value functions; the determination of weights, with particular emphasis on ensuring that the weights reflect the trade-offs that decision-makers are actually willing to make; the amalgamation of attributes into overall plan rankings; and the resolution of differences among methods, and between individuals. There are many MCDM methods available for accomplishing these steps. They can differ in their appropriateness, ease of use, validity, and results. This report also includes an extensive review of past applications, in which we use the step-by-step guide to examine how these applications satisfied the criteria of appropriateness, ease of use, and validity. Case material is drawn from a wide field of utility applications, ranging from project-level environmental impact statements to capacity bidding programs, and from the results of two case studies conducted as part of this research.

  15. Influence of volumes of prostate, rectum, and bladder on treatment planning CT on interfraction prostate shifts during ultrasound image-guided IMRT

    International Nuclear Information System (INIS)

    Reddy, Nandanuri M. S.; Nori, Dattatreyudu; Sartin, William; Maiorano, Samuel; Modena, Jennifer; Mazur, Andrej; Osian, Adrian; Sood, Brijmohan; Ravi, Akkamma; Sampath, Seshadri; Lange, Christopher S.

    2009-01-01

    Purpose: The purpose of this study was to analyze the relationship between prostate, bladder, and rectum volumes on treatment planning CT day and prostate shifts in the XYZ directions on treatment days. Methods: Prostate, seminal vesicles, bladder, and rectum were contoured on CT images obtained in supine position. Intensity modulated radiation therapy plans was prepared. Contours were exported to BAT-ultrasound imaging system. Patients were positioned on the couch using skin marks. An ultrasound probe was used to obtain ultrasound images of prostate, bladder, and rectum, which were aligned with CT images. Couch shifts in the XYZ directions as recommended by BAT system were made and recorded. 4698 couch shifts for 42 patients were analyzed to study the correlations between interfraction prostate shifts vs bladder, rectum, and prostate volumes on planning CT. Results: Mean and range of volumes (cc): Bladder: 179 (42-582), rectum: 108 (28-223), and prostate: 55 (21-154). Mean systematic prostate shifts were (cm, ±SD) right and left lateral: -0.047±0.16 (-0.361-0.251), anterior and posterior: 0.14±0.3 (-0.466-0.669), and superior and inferior: 0.19±0.26 (-0.342-0.633). Bladder volume was not correlated with lateral, anterior/posterior, and superior/inferior prostate shifts (P>0.2). Rectal volume was correlated with anterior/posterior (P 0.2). The smaller the rectal volume or cross sectional area, the larger was the prostate shift anteriorly and vice versa (P 0.2). The smaller the prostate volume, the larger was prostate shift superiorly and vice versa (P<0.05). Conclusions: Prostate and rectal volumes, but not bladder volumes, on treatment planning CT influenced prostate position on treatment fractions. Daily image-guided adoptive radiotherapy would be required for patients with distended or empty rectum on planning CT to reduce rectal toxicity in the case of empty rectum and to minimize geometric miss of prostate.

  16. Global transportation cost modeling for long range planning

    International Nuclear Information System (INIS)

    Pope, R.B.; Michelhaugh, R.D.; Singley, P.T.; Lester, P.B.

    1998-01-01

    The U.S. Department of Energy (DOE) is preparing to perform significant remediation activities of the sites for which it is responsible. To accomplish this, it is preparing a corporate global plan focused on activities over the next decade. Significant in these planned activities is the transportation of the waste arising from the remediation. The costs of this transportation are expected to be large. To support the initial assessment of the plan, a cost-estimating model was developed, peer-reviewed against other available packaging and transportation cost data, and applied to significant number of shipping campaigns of radioactive waste. This cost-estimating model, known as the TEn-year Plan TRAnsportation cost Model (TEPTRAM), can be used to model radioactive material shipments between DOE sites or from DOE sites to non-DOE destinations. The model considers the costs for recovering and processing of the wastes, packaging the wastes for transport, and the carriage of the waste. It also provides a rough order-of-magnitude estimate of labor costs associated with preparing nd undertaking the shipments. At the user's direction, the model can also consider the cost of DOE's interactions with its external stakeholders (e.g., state and local governments and tribal entities) and the cost associated with tracking and communicating with the shipments. By considering all of these sources of costs, it provides a mechanism for assessing and comparing the costs of various waste processing and shipping campaign alternatives to help guide decision-making. Recent analyses of specific planned shipments of transuranic (TRU) waste which consider alternative packaging options are described. These analyses show that options are available for significantly reducing total costs while still satisfying regulatory requirements. (authors)

  17. Water Pollution, Environmental Science Curriculum Guide Supplement.

    Science.gov (United States)

    McKenna, Harold J.

    This curriculum guide is a 40-day unit plan on water pollution developed, in part, from the National Science Foundation Environmental Science Institutes' Ninth Grade Environmental Science Curriculum Guide. This unit contains teacher lesson plans, suggested teacher and student modules, case studies, and activities to be developed by teachers…

  18. Using machine learning algorithms to guide rehabilitation planning for home care clients.

    Science.gov (United States)

    Zhu, Mu; Zhang, Zhanyang; Hirdes, John P; Stolee, Paul

    2007-12-20

    Targeting older clients for rehabilitation is a clinical challenge and a research priority. We investigate the potential of machine learning algorithms - Support Vector Machine (SVM) and K-Nearest Neighbors (KNN) - to guide rehabilitation planning for home care clients. This study is a secondary analysis of data on 24,724 longer-term clients from eight home care programs in Ontario. Data were collected with the RAI-HC assessment system, in which the Activities of Daily Living Clinical Assessment Protocol (ADLCAP) is used to identify clients with rehabilitation potential. For study purposes, a client is defined as having rehabilitation potential if there was: i) improvement in ADL functioning, or ii) discharge home. SVM and KNN results are compared with those obtained using the ADLCAP. For comparison, the machine learning algorithms use the same functional and health status indicators as the ADLCAP. The KNN and SVM algorithms achieved similar substantially improved performance over the ADLCAP, although false positive and false negative rates were still fairly high (FP > .18, FN > .34 versus FP > .29, FN. > .58 for ADLCAP). Results are used to suggest potential revisions to the ADLCAP. Machine learning algorithms achieved superior predictions than the current protocol. Machine learning results are less readily interpretable, but can also be used to guide development of improved clinical protocols.

  19. Maintainability design guide

    International Nuclear Information System (INIS)

    Pack, R.W.

    1985-01-01

    The Human Factors Design Guide for Maintainability provides guidance for systematically incorporating good human factors techniques into the design of power plants. The guide describes a means of developing a comprehensive program plan to ensure compliance with the human factors approaches specified by the utility. The guide also provides specific recommendations for design practices, with examples, bases, and references. The recommendations are formatted for easy use by nuclear power plant design teams and by utility personnel involved in specification and design review. The guide was developed under EPRI research project RP2166-4 and is currently being published

  20. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Science.gov (United States)

    2013-12-19

    ... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...

  1. Preclosure Safety Analysis Guide

    International Nuclear Information System (INIS)

    D.D. Orvis

    2003-01-01

    A preclosure safety analysis (PSA) is a required element of the License Application (LA) for the high- level radioactive waste repository at Yucca Mountain. This guide provides analysts and other Yucca Mountain Repository Project (the Project) personnel with standardized methods for developing and documenting the PSA. The definition of the PSA is provided in 10 CFR 63.2, while more specific requirements for the PSA are provided in 10 CFR 63.112, as described in Sections 1.2 and 2. The PSA requirements described in 10 CFR Part 63 were developed as risk-informed performance-based regulations. These requirements must be met for the LA. The PSA addresses the safety of the Geologic Repository Operations Area (GROA) for the preclosure period (the time up to permanent closure) in accordance with the radiological performance objectives of 10 CFR 63.111. Performance objectives for the repository after permanent closure (described in 10 CFR 63.113) are not mentioned in the requirements for the PSA and they are not considered in this guide. The LA will be comprised of two phases: the LA for construction authorization (CA) and the LA amendment to receive and possess (R and P) high-level radioactive waste (HLW). PSA methods must support the safety analyses that will be based on the differing degrees of design detail in the two phases. The methods described herein combine elements of probabilistic risk assessment (PRA) and deterministic analyses that comprise a risk-informed performance-based safety analysis. This revision to the PSA guide was prepared for the following objectives: (1) To correct factual and typographical errors. (2) To provide additional material suggested from reviews by the Project, the U.S. Department of Energy (DOE), and U.S. Nuclear Regulatory Commission (NRC) Staffs. (3) To update material in accordance with approaches and/or strategies adopted by the Project. In addition, a principal objective for the planned revision was to ensure that the methods and

  2. Facility Effluent Monitoring Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Robinson, A.V.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems against applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. The current operation of the 222-S facilities includes the provision of analytical and radiological chemistry services in support of Hanford Site processing plants. The emphasis is on waste management, chemical processing, environmental monitoring effluent programs at B Plant, the Uranium Oxide Plant, Tank Farms, the 242-A Evaporator, the Waste Encapsulation and Storage Facility, the Plutonium-Uranium Extraction Facility, the Plutonium Finishing Plant, process development/impact activities, and essential materials. The laboratory also supplies analytical services in support of ongoing waste tank characterization

  3. Preparation and production of a home builders' guide. Building and selling energy-efficient homes

    Energy Technology Data Exchange (ETDEWEB)

    Keast, D. N.; Mahoney, J. M.; McMahon, N. M.; Troy, M. H.; Wood, E. W.

    1977-06-01

    Procedures used in the preparation of a manual on the construction of energy-saving one- and two-family houses are described. Prior to writing the manual, builders were interviewed and a bibliographic search was conducted to obtain information on the design, construction and marketing of energy conserving homes. The packaging and distribution of the manual was planned. When written FEA will publish the manual. (ERA citation 04:044977)

  4. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Muhammed, Kabiru [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Jeong, Seung-Young [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-10-15

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident.

  5. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    International Nuclear Information System (INIS)

    Muhammed, Kabiru; Jeong, Seung-Young

    2014-01-01

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident

  6. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    Science.gov (United States)

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  7. Analysis Of Influence Of Spatial Planning On Performance Of Regional Development At Waropen District. Papua Indonesia

    Directory of Open Access Journals (Sweden)

    Suwandi

    2015-08-01

    Full Text Available The various problems in regional spatial planning in Waropen District Papua shows that the Spatial Planning RTRW of Waropen District Papua drafted in 2010 has not had a positive contribution to the settlement of spatial planning problems. This is most likely caused by the inconsistency in the spatial planning. This study tried to observe the consistency of spatial planning as well as its relation to the regional development performance. The method used to observe the consistency of the preparation of guided Spatial Planning RTRW is the analysis of comparative table followed by analysis of verbal logic. In order to determine if the preparation of Spatial Planning RTRW has already paid attention on the synergy with the surrounding regions Inter-Regional Context a map overlay was conducted followed by analysis of verbal logic. To determine the performance of the regional development a Principal Components Analysis PCA was done. The analysis results showed that inconsistencies in the spatial planning had caused a variety of problems that resulted in decreased performance of the regional development. The main problems that should receive more attention are infrastructure development growth economic growth transportation aspect and new properties.

  8. Seismic Safety Guide

    International Nuclear Information System (INIS)

    Eagling, D.G.

    1983-09-01

    This guide provides managers with practical guidelines for administering a comprehensive earthquake safety program. The Guide is comprehensive with respect to earthquakes in that it covers the most important aspects of natural hazards, site planning, evaluation and rehabilitation of existing buildings, design of new facilities, operational safety, emergency planning, special considerations related to shielding blocks, non-structural elements, lifelines, fire protection and emergency facilities. Management of risk and liabilities is also covered. Nuclear facilities per se are not dealt with specifically. The principles covered also apply generally to nuclear facilities but the design and construction of such structures are subject to special regulations and legal controls

  9. Seismic Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    Eagling, D.G. (ed.)

    1983-09-01

    This guide provides managers with practical guidelines for administering a comprehensive earthquake safety program. The Guide is comprehensive with respect to earthquakes in that it covers the most important aspects of natural hazards, site planning, evaluation and rehabilitation of existing buildings, design of new facilities, operational safety, emergency planning, special considerations related to shielding blocks, non-structural elements, lifelines, fire protection and emergency facilities. Management of risk and liabilities is also covered. Nuclear facilities per se are not dealt with specifically. The principles covered also apply generally to nuclear facilities but the design and construction of such structures are subject to special regulations and legal controls.

  10. Optimization of stereotactically-guided conformal treatment planning of sellar and parasellar tumors, based on normal brain dose volume histograms

    International Nuclear Information System (INIS)

    Perks, Julian R.; Jalali, Rakesh; Cosgrove, Vivian P.; Adams, Elizabeth J.; Shepherd, Stephen F.; Warrington, Alan P.; Brada, Michael

    1999-01-01

    Purpose: To investigate the optimal treatment plan for stereo tactically-guided conformal radiotherapy (SCRT) of sellar and parasellar lesions, with respect to sparing normal brain tissue, in the context of routine treatment delivery, based on dose volume histogram analysis. Methods and Materials: Computed tomography (CT) data sets for 8 patients with sellar- and parasellar-based tumors (6 pituitary adenomas and 2 meningiomas) have been used in this study. Treatment plans were prepared for 3-coplanar and 3-, 4-, 6-, and 30-noncoplanar-field arrangements to obtain 95% isodose coverage of the planning target volume (PTV) for each plan. Conformal shaping was achieved by customized blocks generated with the beams eye view (BEV) facility. Dose volume histograms (DVH) were calculated for the normal brain (excluding the PTV), and comparisons made for normal tissue sparing for all treatment plans at ≥80%, ≥60%, and ≥40% of the prescribed dose. Results: The mean volume of normal brain receiving ≥80% and ≥60% of the prescribed dose decreased by 22.3% (range 14.8-35.1%, standard deviation σ = 7.5%) and 47.6% (range 25.8-69.1%, σ 13.2%), respectively, with a 4-field noncoplanar technique when compared with a conventional 3-field coplanar technique. Adding 2 further fields, from 4-noncoplanar to 6-noncoplanar fields reduced the mean normal brain volume receiving ≥80% of the prescribed dose by a further 4.1% (range -6.5-11.8%, σ = 6.4%), and the volume receiving ≥60% by 3.3% (range -5.5-12.2%, σ = 5.4%), neither of which were statistically significant. Each case must be considered individually however, as a wide range is seen in the volume spared when increasing the number of fields from 4 to 6. Comparing the 4- and 6-field noncoplanar techniques to a 30-field conformal field approach (simulating a dynamic arc plan) revealed near-equivalent normal tissue sparing. Conclusion: Four to six widely spaced, fixed-conformal fields provide the optimum class solution

  11. Guide for radiological characterization and measurements for decommissioning of US Department of Energy surplus facilities

    Energy Technology Data Exchange (ETDEWEB)

    Denahm, D. H.; Barnes, M. G.; Jaquish, R. E.; Corley, J. P.; Gilbert, R. O.; Hoenes, G. R.; Jamison, J. D.; McMurray, B. J.; Watson, E. C.

    1983-08-01

    This Guide describes the elements of radiological characterization at DOE excess facilities in preparation for, during, and subsequent to decommissioning operations. It is the intent of this Guide and accompanying appendices to provide the reader (user) with sufficient information to carry out that task with a minimum of confusion and to provide a uniform basis for evaluating site conditions and verifying that decommissioning operations are conducted according to a specific plan. Some areas of particular interest in this Guide are: the need to involve appropriate staff from the affected states in the early planning stages of decommissioning; the need for and suggested methods of radiological site characterization to complete a decommissioning project, including: historical surveys, environmental pathway analyses, statistical sampling design, and choosing appropriate instrumentation and measurements; the need for and emphasis on quality assurance, documentation and records retention; the establishment of a Design Objective approach to applying site-specific contamination limits based on the ALARA philosophy; the establishment of a ''de minimis'' or minimum dose level of concern for decommissioning operations based on existing standards, experience and ALARA considerations.

  12. Planning of Distribution Networks in Baghdad City

    Directory of Open Access Journals (Sweden)

    Thamir M. Abdul-Wahhab

    2015-02-01

    Full Text Available Planning of electrical distribution networks is considered of highest priority at the present time in Iraq, due to the huge increase in electrical demand and expansions imposed on distribution networks as a result of the great and rapid urban development. Distribution system planning simulates and studies the behavior of electrical distribution networks under different operating conditions. The study provide understanding of the existing system and to prepare a short term development plan or a long term plan used to guide system expansion and future investments needed for improved network performance. The objective of this research is the planning of Al_Bayaa 11 kV distribution network in Baghdad city based on the powerful and efficient CYMDist software as a tool for the simulation and analysis of the network. The planning method proposed in this thesis is to reach the optimum operating conditions of the network by combining the network reconfiguration in sequence with the insertion of capacitors with optimal sizing and locations. The optimum performance of the network is achieved by reducing losses, improving voltage profile and alleviating overload for transformers and cables.

  13. Present status and future plans of the study for preparation of Pu reference materials

    International Nuclear Information System (INIS)

    Sumi, Mika; Kageyama, Tomio; Suzuki, Toru

    2007-01-01

    All accountancy analysis at the Plutonium Fuel Development Center of JAEA is performed by isotope dilution mass spectrometry with well-characterized standard materials. Though Pu reference materials has been supplied from foreign country, importing those Pu materials is gradually becoming more difficult and may be almost impossible to import them in future. Thus, in order to establish the capability and expertise for the preparation of Pu reference materials, JAEA has started collaborative work with NBL who has high skills for preparing and supplying nuclear reference materials for long periods. One of the targets of this collaboration is preparation of standard material for IDMS (LSD spike). MOX powder which has been stored in JAEA was dissolved and Purified to obtain Pu solution. A small portion of the Purified solution was transported to NBL for analysis. LSD spike will be prepared from this Pu solution and then validation analysis and performance test including stability test will be performed with NBL and JAEA. This report presents status and future plans for the collaboration work. (author)

  14. ITIL Foundation exam study guide

    CERN Document Server

    Gallacher, Liz

    2012-01-01

    Everything you need to prepare for the ITIL exam The ITIL (Information Technology Infrastructure Library) exam is the ultimate certification for IT service management. This essential resource is a complete guide to preparing for the ITIL Foundation exam and includes everything you need for success. Organized around the ITIL Foundation syllabus, the study guide addresses the ITIL Service Lifecycles, the ITIL processes, roles, and functions, and also thoroughly explains how the Service Lifecycle provides effective and efficient IT services. Offers an introduction to IT service management and ITI

  15. 76 FR 77431 - Decommissioning Planning During Operations

    Science.gov (United States)

    2011-12-13

    ... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...

  16. 78 FR 663 - Decommissioning Planning During Operations

    Science.gov (United States)

    2013-01-04

    ...] Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide..., ``Decommissioning Planning During Operations.'' The guide describes a method that the NRC staff considers acceptable for use by holders of licenses in complying with the NRC's Decommissioning Planning Rule (DPR) (76 FR...

  17. Effects of Teacher Preparation Courses: Do Graduates Use What They Learned to Plan Mathematics Lessons?

    Science.gov (United States)

    Morris, Anne K.; Hiebert, James

    2017-01-01

    We investigated whether the content pre-service teachers studied in elementary teacher preparation mathematics courses was related to their performance on a mathematics lesson planning task 2 and 3 years after graduation. The relevant mathematics knowledge was studied when the teachers were freshmen, 5 to 6 years earlier. Results showed that when…

  18. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  19. Cooperative development of nuclear safety regulations, guides and standards based on NUSS

    International Nuclear Information System (INIS)

    Pachner, J.; Boyd, F.C.; Yaremy, E.M.

    1984-10-01

    In 1983, the Atomic Energy Control Board and Atomic Energy of Canada Limited conducted a study of a possible joint program involving Canada, a nuclear power plant importing Member State and the IAEA for the development of the national nuclear safety regulations and guides based on NUSS documents. During the study, a work plan with manpower estimates for the development of design was prepared as an investigatory exercise. The work plan suggests that a successful NUSS implementation in developing Member States will require availability of significant resources at the start of the program. The study showed that such a joint program could provide an effective mechanism for transfer of nuclear safety know-how to the developing Member States through NUSS implementation

  20. Analgesic efficacy of the ultrasound-guided blockade of the transversus abdominis plane - a systematic review

    Directory of Open Access Journals (Sweden)

    Javier Ripollés

    2015-08-01

    Full Text Available BACKGROUND: The transverse abdominal plan blockade is a block of abdominal wall that has diffused rapidly in the clinical practice as part of a multimodal analgesia for abdominal surgery. The performance of the ultrasound-guided technique has allowed the lowering of potential complications, as well as new approaches that were carried out according to the descriptions, and the prospective studies would make it possible to utilize the transverse abdominal plan blockade in different surgical interventions; however, the results obtained in randomized clinical trials are inconsistent.OBJECTIVES: To prepare a systematic review aiming to determine the efficacy of the ultrasound-guided transverse abdominal plan blockade for different surgical interventions, as well as the indications according to the approaches and their influences.METHODS: Two research approaches, one manual, and the other in Pubmed returned 28 randomized clinical trials where intervention with ultrasound-guided transverse abdominal plan blockades was performed to compare the analgesic efficacy in contrast to another technique in adults, published between 2007 and October 2013, in English or Spanish, with Jadad score > 1, according to the inclusion criteria for this review. The authors analyzed independently all the randomized clinical trials.CONCLUSIONS: The transverse abdominal plan blockades have been shown to be an effective technique in colorectal surgery, cesarean section, cholecystectomy, hysterectomy, appendectomy, donor nephrectomy, retropubic prostatectomy, and bariatric surgery. However, the data found in randomized clinical trial are not conclusive, and as a result, it is necessary to develop new and well designed randomized clinical trial, with enough statistical power to compare different approaches, drugs, doses, and volumes for the same intervention, aiming to answer the current questions and their effects in the habitual clinical practice.

  1. A guide to contingency planning for oil spills on water. V. 2

    International Nuclear Information System (INIS)

    1997-01-01

    The movement of oil from the dominant production centres of the world to the world-wide market is primarily achieved by the use of tankers and pipelines. The global pattern of marine transport is well established as shown in Figure 1, below. While the environmental priority for all tanker operations is the prevention of spills, it is recognized that marine spills are a factor for which management must plan. This report, which is prepared for those managements in industry and government, describes the elements of the contingency planning process. It stresses the importance of cooperative activity between industry and government. It presents a consensus view of the IPIECA membership which is representative of the international oil industry. It reflects current informed thinking in the light of the extensive individual company and industry organization reviews that have taken place since the Exxon Valdez and other major incidents in 1989/90. This report has drawn freely on many of these reviews, some of which have been published. (UK)

  2. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  3. Global transportation cost modeling for long-range planning

    International Nuclear Information System (INIS)

    Pope, R.B.; Michelhaugh, R.D.; Singley, P.T.; Lester, P.B.

    1998-02-01

    The US Department of Energy (DOE) is preparing to perform significant remediation activities of the sites for which it is responsible. To accomplish this, it is preparing a corporate global plan focused on activities over the next decade. Significant in these planned activities is the transportation of the waste arising from the remediation. The costs of this transportation are expected to be large. To support the initial assessment of the plan, a cost estimating model was developed, peer-reviewed against other available packaging and transportation cost data, and applied to a significant number of shipping campaigns of radioactive waste. This cost estimating model, known as the Ten-year Plan Transportation Cost Model (TEPTRAM), can be used to model radioactive material shipments between DOE sites or from DOE sites to non-DOE destinations. The model considers the costs for (a) recovering and processing of the wastes, (b)packaging the wastes for transport, and (c) the carriage of the waste. It also provides a rough order of magnitude estimate of labor costs associated with preparing and undertaking the shipments. At the user's direction, the model can also consider the cost of DOE's interactions with its external stakeholders (e.g., state and local governments and tribal entities) and the cost associated with tracking and communicating with the shipments. By considering all of these sources of costs, it provides a mechanism for assessing and comparing the costs of various waste processing and shipping campaign alternatives to help guide decision-making. Recent analyses of specific planned shipments of transuranic (TRU) waste which consider alternative packaging options are described. These analyses show that options are available for significantly reducing total costs while still satisfying regulatory requirements

  4. Career Education Instructional Guide.

    Science.gov (United States)

    State Univ. of New York, Oswego. Coll. at Oswego. Dept. of Industrial Arts and Technology.

    The guide is designed primarily for industrial arts teachers at the middle school level who wish to integrate career education into their curricula. The lessons and activities attempt to establish a balance among career information, technical information, and hands-on experience. The guide contains six lesson plans which cover the topics: the…

  5. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bauer, L.R.; Tullis, M.S.; Paulick, R.P.; Roush, L.L.

    1994-07-01

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  6. Transmission efficiency of neutron guide tube with alignment errors

    International Nuclear Information System (INIS)

    Kawabata, Yuji; Suzuki, Masatoshi; Sakamoto, Masanobu; Harami, Taikan; Takahashi, Hidetake; Onishi, Nobuaki

    1990-01-01

    The experimental studies on the neutron transmission efficiencies of neutron guide tubes were carried out by using thermal neutrons from the JAERI electron linac. The neutron guide tube facility on a large scale have been planned on the reconstructed JRR-3 in JAERI. The neutron efficiencies of the 1/10 scale neutron guide tube, which is 2 mm width and 1.8 m length, with and without appreciable alignment errors were studied to evaluate the efficiencies of the planned ones. Calculated results by the Neutron Guide Tube Analysis Code 'NEUGT' were also assessed by these neutron experiments. The experimental results agree well with the calculated results by 'NEUGT' even with alignment errors. From this experimental study, the efficiency of the planned neutron guide tubes is estimated to be good enough for the neutron beam experiments. (author)

  7. Evaluation of implementation of municipal roads’ maintenance plans in Palestine: A pilot case study

    Directory of Open Access Journals (Sweden)

    Amjad Issa

    2017-09-01

    Full Text Available The recent preparation of the Operation and Maintenance (O&M Manual for Palestinian municipalities is an important step to guide them towards preparing and implementing their O&M priority-based plans, considering scare resources. During the course of preparation of the Manual, the proposed procedures were applied at ten pilot municipalities. This study aims to explore the outcome of the implementation of the 2014 O&M road maintenance plans at these municipalities. To achieve this, analysis of the outcome of a questionnaire designed to collect relevant information from these municipalities was conducted. The results show that seven of the targeted municipalities used the prioritization criteria proposed in the O&M Manual. Despite that the remaining municipalities had the liberty to slightly change the relative weight of the indicators, sensitivity analysis was conducted and indicated robustness of the indicators. The average percentage of roads’ lengths of the actually maintained to the planned was 35%, suggesting that the plans were ambitious and need to be more rational. Most of the allocated funds for road maintenance came from the municipalities own budgets, indicating need to have more financing by the government to ensure the integrity of the municipal road infrastructure assets. The results also indicated that 95% of the maintenance works were executed through external contracts, and that the municipalities need to be supported and equipped to conduct the basic road maintenance works. Keywords: Road maintenance plans, Maintenance prioritization, Municipal roads’ maintenance, Maintenance plans evaluation, Palestine

  8. Multi-criteria, personalized route planning using quantifier-guided ordered weighted averaging operators

    Science.gov (United States)

    Nadi, S.; Delavar, M. R.

    2011-06-01

    This paper presents a generic model for using different decision strategies in multi-criteria, personalized route planning. Some researchers have considered user preferences in navigation systems. However, these prior studies typically employed a high tradeoff decision strategy, which used a weighted linear aggregation rule, and neglected other decision strategies. The proposed model integrates a pairwise comparison method and quantifier-guided ordered weighted averaging (OWA) aggregation operators to form a personalized route planning method that incorporates different decision strategies. The model can be used to calculate the impedance of each link regarding user preferences in terms of the route criteria, criteria importance and the selected decision strategy. Regarding the decision strategy, the calculated impedance lies between aggregations that use a logical "and" (which requires all the criteria to be satisfied) and a logical "or" (which requires at least one criterion to be satisfied). The calculated impedance also includes taking the average of the criteria scores. The model results in multiple alternative routes, which apply different decision strategies and provide users with the flexibility to select one of them en-route based on the real world situation. The model also defines the robust personalized route under different decision strategies. The influence of different decision strategies on the results are investigated in an illustrative example. This model is implemented in a web-based geographical information system (GIS) for Isfahan in Iran and verified in a tourist routing scenario. The results demonstrated, in real world situations, the validity of the route planning carried out in the model.

  9. Automated dental implantation using image-guided robotics: registration results.

    Science.gov (United States)

    Sun, Xiaoyan; McKenzie, Frederic D; Bawab, Sebastian; Li, Jiang; Yoon, Yongki; Huang, Jen-K

    2011-09-01

    One of the most important factors affecting the outcome of dental implantation is the accurate insertion of the implant into the patient's jaw bone, which requires a high degree of anatomical accuracy. With the accuracy and stability of robots, image-guided robotics is expected to provide more reliable and successful outcomes for dental implantation. Here, we proposed the use of a robot for drilling the implant site in preparation for the insertion of the implant. An image-guided robotic system for automated dental implantation is described in this paper. Patient-specific 3D models are reconstructed from preoperative Cone-beam CT images, and implantation planning is performed with these virtual models. A two-step registration procedure is applied to transform the preoperative plan of the implant insertion into intra-operative operations of the robot with the help of a Coordinate Measurement Machine (CMM). Experiments are carried out with a phantom that is generated from the patient-specific 3D model. Fiducial Registration Error (FRE) and Target Registration Error (TRE) values are calculated to evaluate the accuracy of the registration procedure. FRE values are less than 0.30 mm. Final TRE values after the two-step registration are 1.42 ± 0.70 mm (N = 5). The registration results of an automated dental implantation system using image-guided robotics are reported in this paper. Phantom experiments show that the practice of robot in the dental implantation is feasible and the system accuracy is comparable to other similar systems for dental implantation.

  10. Three-dimensional plotting and printing of an implant drilling guide: simplifying guided implant surgery.

    Science.gov (United States)

    Flügge, Tabea Viktoria; Nelson, Katja; Schmelzeisen, Rainer; Metzger, Marc Christian

    2013-08-01

    To present an efficient workflow for the production of implant drilling guides using virtual planning tools. For this purpose, laser surface scanning, cone beam computed tomography, computer-aided design and manufacturing, and 3-dimensional (3D) printing were combined. Intraoral optical impressions (iTero, Align Technologies, Santa Clara, CA) and digital 3D radiographs (cone beam computed tomography) were performed at the first consultation of 1 exemplary patient. With image processing techniques, the intraoral surface data, acquired using an intraoral scanner, and radiologic 3D data were fused. The virtual implant planning process (using virtual library teeth) and the in-office production of the implant drilling guide was performed after only 1 clinical consultation of the patient. Implant surgery with a computer-aided design and manufacturing produced implant drilling guide was performed during the second consultation. The production of a scan prosthesis and multiple preoperative consultations of the patient were unnecessary. The presented procedure offers another step in facilitating the production of drilling guides in dental implantology. Four main advantages are realized with this procedure. First, no additional scan prosthesis is needed. Second, data acquisition can be performed during the first consultation. Third, the virtual planning is directly transferred to the drilling guide without a loss of accuracy. Finally, the treatment cost and time required are reduced with this facilitated production process. Copyright © 2013 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  11. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    Science.gov (United States)

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  12. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  13. Communication and Industrial Electronics. Trade and Industrial Education Trade Preparatory Training Guide.

    Science.gov (United States)

    Nebraska State Dept. of Education, Lincoln. Div. of Vocational Education.

    One of a series of curriculum guides prepared for the electricity/electronics occupations cluster, this guide identifies the essentials of the communication and industrial electronics trade as recommended by the successful electrical servicemen. An instructional program based upon the implementation of the guide is expected to prepare a student to…

  14. A Strategic Plan of Academic Management System as Preparation for EAC Accreditation Visit--From UKM Perspective

    Science.gov (United States)

    Ab-Rahman, Mohammad Syuhaimi; Yusoff, Abdul Rahman Mohd; Abdul, Nasrul Amir; Hipni, Afiq

    2015-01-01

    Development of a robust platform is important to ensure that the engineering accreditation process can run smoothly, completely and the most important is to fulfill the criteria requirements. In case of Malaysia, the preparation for EAC (Engineering Accreditation Committee) assessment required a good strategic plan of academic management system…

  15. Concept and Planning of Site Preparation for Radioactive Waste Disposal in Jawa and Surrounding Area

    International Nuclear Information System (INIS)

    Heru Sriwahyuni; Sastrowardoyo, Pratomo B.; Teddy Sumantri; Dewi Susilowati; Hendra Adhi Pratama; Syarmufni, A.

    2008-01-01

    Concept and planning for radioactive waste disposal in Jawa and surrounding area have been done. These activities were part of the investigation for preparation of repository location in Jawa. In this report, the summary of previous sitting activities, the waste inventory in Radioactive Waste Technology Centre, and list of important factors for sitting on radioactive waste disposal location. Several potential areas such as Karawang, Subang, Majalengka, Rembang, Tuban, Madura will be the focus for next activities. The result will be part of activities report regarding the preparation of repository location in Jawa and surrounding area, that will be used as recommendation prior to radioactive waste management policy. (author)

  16. The ARL 2030 Scenarios: A User's Guide for Research Libraries

    Science.gov (United States)

    Association of Research Libraries, 2010

    2010-01-01

    This user's guide was developed to advance local planning at ARL member libraries. It is written for library leaders writ large and for anyone leading or contributing to research library planning processes. Users do not need advanced facilitation skills to benefit from this guide, but facilitators charged with supporting scenario planning will…

  17. Improving advance care planning for English-speaking and Spanish-speaking older adults: study protocol for the PREPARE randomised controlled trial

    OpenAIRE

    Sudore, RL; Barnes, DE; Le, GM; Ramos, R; Osua, SJ; Richardson, SA; Boscardin, J; Schillinger, D

    2016-01-01

    Introduction Advance care planning (ACP) is a process that allows patients to identify their goals for medical care. Traditionally, ACP has focused on completing advance directives; however, we have expanded the ACP paradigm to also prepare patients to communicate their wishes and make informed decisions. To this end, we created an ACP website called PREPARE (http://www.prepareforyourcare.org) to prepare diverse English-speaking and Spanish-speaking older adults for medical decision-making. H...

  18. Do we need an emergency planning for contamination with alpha or beta emitting materials and how should this be?

    International Nuclear Information System (INIS)

    Gellermann, Rainer; Kueppers, Christian; Urbach, Michael; Schnadt, Horst; Lange, Florentin

    2016-01-01

    The emergency planning up to now was geared to the consequences of accidents in nuclear facilities. There were no planning guidelines like the recommendations for emergency planning in the vicinity of nuclear facilities for other radiological incidents. According to article 98 of the new European radiation protection standards the member states have to take care for the preparation of emergency plans fir the case of emergency exposure scenarios. The study discusses several scenarios that might induce alpha or beta contamination, existing approaches for guiding contamination values, intervention benchmarks, protection strategies including continuing public information, selected radionuclides that might be involved, exposure paths, guidance benchmarks for person decontamination, and recommendations for new emergency plans.

  19. Standard Guide for Radiation Protection Program for Decommissioning Operations

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1987-01-01

    1.1 This guide provides instruction to the individual charged with the responsibility for developing and implementing the radiation protection program for decommissioning operations. 1.2 This guide provides a basis for the user to develop radiation protection program documentation that will support both the radiological engineering and radiation safety aspects of the decommissioning project. 1.3 This guide presents a description of those elements that should be addressed in a specific radiation protection plan for each decommissioning project. The plan would, in turn, form the basis for development of the implementation procedures that execute the intent of the plan. 1.4 This guide applies to the development of radiation protection programs established to control exposures to radiation and radioactive materials associated with the decommissioning of nuclear facilities. The intent of this guide is to supplement existing radiation protection programs as they may pertain to decommissioning workers, members of...

  20. Standard Guide for Conducting Supplemental Surveillance Tests for Nuclear Power Reactor Vessels, E 706 (IH)

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide discusses test procedures that can be used in conjunction with, but not as alternatives to, those required by Practices E185 and E2215 for the surveillance of nuclear reactor vessels. The supplemental mechanical property tests outlined permit the acquisition of additional information on radiation-induced changes in fracture toughness, notch ductility, and yield strength properties of the reactor vessel steels. 1.2 This guide provides recommendations for the preparation of test specimens for irradiation, and identifies special precautions and requirements for reactor surveillance operations and postirradiation test planning. Guidance on data reduction and computational procedures is also given. Reference is made to other ASTM test methods for the physical conduct of specimen tests and for raw data acquisition.

  1. Radiation Dose Reduction in CT Fluoroscopy-Guided Cervical Transforaminal Epidural Steroid Injection by Modifying Scout and Planning Steps

    Energy Technology Data Exchange (ETDEWEB)

    Paik, Nam Chull, E-mail: pncspine@gmail.com [Arumdaun Wooldul Spine Hospital, Department of Radiology (Korea, Republic of)

    2016-04-15

    Background and PurposeIn CT fluoroscopy (CTF)-guided cervical transforaminal epidural steroid injection (TFESI), the majority of radiation dose is contributed by the planning CT scan rather than the CTF procedure itself. We replaced the planning helical CT with a spot CTF and accordingly changed the patient posture during scout and planning scans. The aim of this study was to test whether radiation dose reduction would be achieved by this protocol modification while still maintaining technical performance.MethodsOverall, 338 consecutive procedures before (control group: n = 163) and after (study group: n = 175) instituting the above-mentioned protocol modification were analyzed retrospectively, comparing patient characteristics (age, sex, neck diameter, and level injected) and technical performance [technical success rate, dose-length product (DLP), inadvertent contrast flow incidence, number of CTF acquisitions, and procedural time] between the two groups.ResultsAll injections were technically successful at every level from C3–C4 to C7–T1 without serious complications in both groups. The median DLP of the study group (7.92 mGy·cm) was significantly reduced compared to that of the control group (39.05 mGy·cm, P < 0.001). There were no significant differences between the two groups regarding the incidence of inadvertent contrast flow (20.6 vs. 17.2 %, P = 0.426), number of CTF acquisitions (median 5 vs. 4, P = 0.123), and the procedural time (median 6.62 vs. 6.90 min, P = 0.100).ConclusionsWhen conducting CTF-guided cervical TFESIs, a significant radiation dose reduction (median 79.7 % in DLP) can be achieved by modifying scout and planning steps, without compromising the technical performance.

  2. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  3. Machine Accounting. An Instructor's Guide.

    Science.gov (United States)

    Gould, E. Noah, Ed.

    Designed to prepare students to operate the types of accounting machines used in many medium-sized businesses, this instructor's guide presents a full-year high school course in machine accounting covering 120 hours of instruction. An introduction for the instructor suggests how to adapt the guide to present a 60-hour module which would be…

  4. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  5. Implant-Supported PMMA Monolithic Full-Arch Rehabilitation with Surgical Computer-Planned Guide and Immediate Provisional: A Case Report with One Year Follow-Up

    Directory of Open Access Journals (Sweden)

    Vincenzo Luca Zizzari

    2018-01-01

    Full Text Available The aim of this case report is to describe the surgical and prosthetic procedures to achieve maxillary and mandibular implant-supported PMMA monolithic full-arch rehabilitation (PMFR with surgical computer-planned guide and immediate provisional. In such cases, the correct planning of dental implants’ position, length, and diameter and the prosthetic phases via computer-aided design are very important to achieve good aesthetic and functional long-lasting results.

  6. Implant-Supported PMMA Monolithic Full-Arch Rehabilitation with Surgical Computer-Planned Guide and Immediate Provisional: A Case Report with One Year Follow-Up

    OpenAIRE

    Zizzari, Vincenzo Luca; Tacconelli, Gianmarco

    2018-01-01

    The aim of this case report is to describe the surgical and prosthetic procedures to achieve maxillary and mandibular implant-supported PMMA monolithic full-arch rehabilitation (PMFR) with surgical computer-planned guide and immediate provisional. In such cases, the correct planning of dental implants’ position, length, and diameter and the prosthetic phases via computer-aided design are very important to achieve good aesthetic and functional long-lasting results.

  7. Fast and robust online adaptive planning in stereotactic MR-guided adaptive radiation therapy (SMART) for pancreatic cancer.

    Science.gov (United States)

    Bohoudi, O; Bruynzeel, A M E; Senan, S; Cuijpers, J P; Slotman, B J; Lagerwaard, F J; Palacios, M A

    2017-12-01

    To implement a robust and fast stereotactic MR-guided adaptive radiation therapy (SMART) online strategy in locally advanced pancreatic cancer (LAPC). SMART strategy for plan adaptation was implemented with the MRIdian system (ViewRay Inc.). At each fraction, OAR (re-)contouring is done within a distance of 3cm from the PTV surface. Online plan re-optimization is based on robust prediction of OAR dose and optimization objectives, obtained by building an artificial neural network (ANN). Proposed limited re-contouring strategy for plan adaptation (SMART 3CM ) is evaluated by comparing 50 previously delivered fractions against a standard (re-)planning method using full-scale OAR (re-)contouring (FULLOAR). Plan quality was assessed using PTV coverage (V 95% , D mean , D 1cc ) and institutional OAR constraints (e.g. V 33Gy ). SMART 3CM required a significant lower number of optimizations than FULLOAR (4 vs 18 on average) to generate a plan meeting all objectives and institutional OAR constraints. PTV coverage with both strategies was identical (mean V 95% =89%). Adaptive plans with SMART 3CM exhibited significant lower intermediate and high doses to all OARs than FULLOAR, which also failed in 36% of the cases to adhere to the V 33Gy dose constraint. SMART 3CM approach for LAPC allows good OAR sparing and adequate target coverage while requiring only limited online (re-)contouring from clinicians. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. CEH Certified Ethical Hacker Study Guide

    CERN Document Server

    Graves, Kimberly

    2010-01-01

    Prepare for the new version of CEH certification with this advanced guide. Once you learn the thought processes of unethical hackers, you can figure out how to secure your computer systems to defend against them. That's the philosophy behind ethical hacking, and it's a growing field. Prepare for certification in this important area with this advanced study guide that covers all exam objectives for the challenging CEH Certified Ethical Hackers exam. The book provides full coverage of exam topics, real-world examples, and a CD with additional materials for extra review and practice.:; Covers eth

  9. Head Start Center Design Guide.

    Science.gov (United States)

    Administration for Children, Youth, and Families (DHHS), Washington, DC. Head Start Bureau.

    This guide contains suggested criteria for planning, designing, and renovating Head Start centers so that they are safe, child-oriented, developmentally appropriate, beautiful, environmentally sensitive, and functional. The content is based on the U.S. General Services Administration's Child Care Center Design Guide, PBS-P140, which was intended…

  10. EVENT PLANNING USING FUNCTION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase; Jodi Grgich

    2011-06-01

    Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

  11. Autodesk Revit Architecture 2014 review for certification official certification preparation

    CERN Document Server

    ASCENT center for technical knowledge

    2014-01-01

    The Autodesk® Revit® Architecture 2014 Review for Certification guide is intended for users of the Autodesk Revit Architecture software who are preparing to complete the Autodesk Revit Architecture 2014 Certified Professional exam. This guide contains a collection of relevant instructional topics, practices, and review questions from the Autodesk Official Training Guides (AOTG) training guides created by ASCENT - Center for Technical Knowledge® and pertaining specifically to the Certified Professional exam topics and objectives. This training guide is intended for experienced users of the Autodesk Revit Architecture software in preparation for certification. New users of the software should refer to the AOTG training guides from ASCENT, such as Autodesk Revit Architecture 2014 Fundamentals, for more comprehensive instruction.

  12. Split-mouth comparison of the accuracy of computer-generated and conventional surgical guides.

    Science.gov (United States)

    Farley, Nathaniel E; Kennedy, Kelly; McGlumphy, Edwin A; Clelland, Nancy L

    2013-01-01

    Recent clinical studies have shown that implant placement is highly predictable with computer-generated surgical guides; however, the reliability of these guides has not been compared to that of conventional guides clinically. This study aimed to compare the accuracy of reproducing planned implant positions with computer-generated and conventional surgical guides using a split-mouth design. Ten patients received two implants each in symmetric locations. All implants were planned virtually using a software program and information from cone beam computed tomographic scans taken with scan appliances in place. Patients were randomly selected for computer-aided design/computer-assisted manufacture (CAD/CAM)-guided implant placement on their right or left side. Conventional guides were used on the contralateral side. Patients underwent operative cone beam computed tomography postoperatively. Planned and actual implant positions were compared using three-dimensional analyses capable of measuring volume overlap as well as differences in angles and coronal and apical positions. Results were compared using a mixed-model repeated-measures analysis of variance and were further analyzed using a Bartlett test for unequal variance (α = .05). Implants placed with CAD/CAM guides were closer to the planned positions in all eight categories examined. However, statistically significant differences were shown only for coronal horizontal distances. It was also shown that CAD/CAM guides had less variability than conventional guides, which was statistically significant for apical distance. Implants placed using CAD/CAM surgical guides provided greater accuracy in a lateral direction than conventional guides. In addition, CAD/CAM guides were more consistent in their deviation from the planned locations than conventional guides.

  13. Theory and Praxis in Community Based Language Development: preliminary findings from applications of the Guide for Planning the Future of Our Language

    OpenAIRE

    Eberhard David M.

    2017-01-01

    This study will provide a critique of preliminary results obtained from the application of the ‘Guide for Planning the Future of Our Language’ (Hanawalt, Varenkamp, Lahn, & Eberhard 2015) in minority speech communities. This recent methodological tool was developed to enable and empower minoritized language groups to do their own language planning and to control their own language development. The tool is based on a theoretical approach to community based language development known as the ‘Su...

  14. Elaboration and modification of the waste zoning plan in basic nuclear installations. ASN Guide Nr 23, Release of the 2016/08/30

    International Nuclear Information System (INIS)

    2016-01-01

    After having recalled the relevant regulatory texts and guides, this guide aims at detailing conditions of elaboration and of modification of the waste zoning plan which is defined in one of these texts, and applies requirements and recommendations of others of them. It first recalls the general doctrine of waste management in basic nuclear installations. It describes how the waste zoning plan and the reference waste zoning map are elaborated and justified, how the relevancy of this plan and this map are confirmed through radiological controls and based on general operation rules and periodic assessments. It also describes how contamination transfers and material activation are prevented, and discusses waste radiological controls to be performed. The next part addressed waste zoning and ways of management for wastes coming from conventional waste areas, and from areas of possible production of nuclear wastes. Issues of waste zoning downgrading or reclassification are then addressed by distinguishing temporary and definitive modifications (in one way or the other). Some peculiar cases are addressed: delimitation of waste zoning at the level of equipments, conventional processing of some wastes, radioactive waste warehousing, outdoor areas of possible production of nuclear wastes

  15. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  16. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    International Nuclear Information System (INIS)

    Jannik, G.T.

    1994-01-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan's purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements

  17. 76 FR 9327 - Gulf Spill Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a...

    Science.gov (United States)

    2011-02-17

    ... to compensate the public and the environment for loss of natural resources and services from the... Florida, as well as human uses of these resources. Natural Resource Damage Assessment (NRDA) is the... Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a Programmatic Environmental...

  18. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    International Nuclear Information System (INIS)

    Say, Nuriye Peker; Yuecel, Muzaffer

    2006-01-01

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  19. 75 FR 28073 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-05-19

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Draft Regulatory Guide: Issuance, Availability... Guide, DG-3039, ``Standard Format and Content for Emergency Plans for Fuel Cycle and Materials...

  20. Test planning and performance

    International Nuclear Information System (INIS)

    Zola, Maurizio

    2001-01-01

    Testing plan should include Safety guide Q4 - Inspection and testing - A testing plan should be prepared including following information: General information (facility name, item or system reference, procurement document reference, document reference number and status, associated procedures and drawings); A sequential listing of all testing activities; Procedure, work instruction, specification or standard to be followed in respect of each operation and test; Acceptance criteria; Identification of who is performing tests; Identification of hold points; Type of records to be prepared for each test; Persons and organizations having authority for final acceptance. Proposed activities sequence is: visual, electrical and mechanical checks; environmental tests (thermal aging, vibrations aging, radioactive aging); performance evaluation in extreme conditions; dynamic tests with functional checks; final electrical and mechanical checks The planning of the tests should always be performed taking into account an interpretative model: a very tight cooperation is advisable between experimental people and numerical people dealing with the analysis of more or less complex models for the seismic assessment of structures and components. Preparatory phase should include the choice of the following items should be agreed upon with the final user of the tests: Excitation points, Excitation types, Excitation amplitude with respect to frequency, Measuring points. Data acquisition, recording and storage, should take into account the characteristics of the successive data processing: to much data can be cumbersome to be processed, but to few data can make unusable the experimental results. The parameters for time history acquisition should be chosen taking into account data processing: for Shock Response Spectrum calculation some special requirements should be met: frequency bounded signal, high frequency sampling, shock noise. For stationary random-like excitation, the sample length

  1. TRAC User's Guide

    International Nuclear Information System (INIS)

    Boyack, B.E.; Stumpf, H.; Lime, J.F.

    1985-11-01

    This guide has been prepared to assist users in applying the Transient Reactor Analysis Code (TRAC). TRAC is an advanced best-estimate systems code for analyzing transients in thermal-hydraulic systems. The code is very general. Because it is general, efforts to model specific nuclear power plants or experimental facilities often present a challenge to the TRAC user. This guide has been written to assist first-time or intermediate users. It is specifically written for the TRAC version designated TRAC-PF1/MOD1. The TRAC User's Guide should be considered a companion document to the TRAC Code Manual; the user will need both documents to use TRAC effectively. 18 refs., 45 figs., 19 tabs

  2. Planning "discrete" movements using a continuous system: insights from a dynamic field theory of movement preparation.

    Science.gov (United States)

    Schutte, Anne R; Spencer, John P

    2007-04-01

    The timed-initiation paradigm developed by Ghez and colleagues (1997) has revealed two modes of motor planning: continuous and discrete. Continuous responding occurs when targets are separated by less than 60 degrees of spatial angle, and discrete responding occurs when targets are separated by greater than 60 degrees . Although these two modes are thought to reflect the operation of separable strategic planning systems, a new theory of movement preparation, the Dynamic Field Theory, suggests that two modes emerge flexibly from the same system. Experiment 1 replicated continuous and discrete performance using a task modified to allow for a critical test of the single system view. In Experiment 2, participants were allowed to correct their movements following movement initiation (the standard task does not allow corrections). Results showed continuous planning performance at large and small target separations. These results are consistent with the proposal that the two modes reflect the time-dependent "preshaping" of a single planning system.

  3. [An application of the strategy results cycle to HIV/AIDS strategic planning in Latin America].

    Science.gov (United States)

    Rodríguez-García, Rosalía; Rosenberg, Hernán

    2013-07-01

    To describe the Strategy Results Cycle (SRC), a model that approaches planning as an ongoing cycle of seven phases that continually responds and adapts to existing evidence. Reliable sources were used for the preparation of databases and expenditure-costing data for resources needs analysis. The planning process 6-9 months to complete a national strategic plan that was informed by evidence, focused on results and costed. Knowledge transfer facilitated national leadership and stakeholders' participation. Between 2007 and 2011, 13 of 16 countries adopted the Strategy Results Cycle model. The evidence supported the identification of results and the expenditure-costing analysis improved budget allocation efficiency. The SRC facilitated purposeful participation and added value to previous planning approaches by connecting "thinking" and "doing" which resulted in national strategic plans that are designed by stakeholders, relevant to local conditions, and can guide implementation and resource mobilization.

  4. The Nursery Worker. Teacher Guide. Revised.

    Science.gov (United States)

    Welch, A. W.

    This teacher's guide is designed for use in a vocational horticulture course designed to prepare students for jobs as nursery workers. Addressed in the individual units of the guide are the following topics: the nursery industry; soils; plant growth; plant nutrition; plant propagation methods; nursery field practices; pest control; techniques for…

  5. Pandemic Planning: Are Universities Really Prepared?

    Science.gov (United States)

    Pokrywka, Francis J.

    2016-01-01

    Planning for a pandemic influenza outbreak at a college or university cannot be done in a vacuum. Like any emergency plan, it needs to be a coordinated effort by a dedicated and unselfish group of individuals at the university pulling together a multitude of people and resources focused on a common goal. There is an ongoing struggle among…

  6. Test plan for preparing the Rapid Transuranic Monitoring Laboratory for field deployment

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1994-04-01

    This plan describes experimental work that will be performed during fiscal year 1994 to prepare the Rapid Transuranic Monitoring Laboratory (RTML) for routine field use by US Department of Energy (DOE) Environmental Restoration and Waste Management programs. The RTML is a mobile, field-deployable laboratory developed at the Idaho National Engineering Laboratory (INEL) that provides a rapid, cost-effective means of characterizing and monitoring radioactive waste remediation sites for low-level radioactive contaminants. Analytical instruments currently installed in the RTML include an extended-range, germanium photon analysis spectrometer with an automatic sample changer; two, large-area, ionization chamber alpha spectrometers; and four alpha continuous air monitors. The RTML was field tested at the INEL during June 1993 in conjunction with the Buried Waste Integrated Demonstration's remote retrieval demonstration. The major tasks described in this test plan are to (a) evaluate the beta detectors for use in screening soil samples for 90 Sr, (b) upgrade the alpha spectral analysis software programs, and (c) upgrade the photon spectral analysis software programs

  7. Human-system interface design review guideline -- Review software and user's guide: Final report. Revision 1, Volume 3

    International Nuclear Information System (INIS)

    1996-06-01

    NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant's HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 3 contains an interactive software application of the NUREG-0700, Revision 1 guidance and a user's guide for this software. The software supports reviewers during review preparation, evaluation design using the human factors engineering guidelines, and in report preparation. The user's guide provides system requirements and installation instructions, detailed explanations of the software's functions and features, and a tutorial on using the software

  8. Comptia Network+ review guide exam N10-006

    CERN Document Server

    Ferguson, Bill

    2015-01-01

    Be prepared for the Network+ exam CompTIA Network+ Review Guide is your ideal study companion for preparing for the CompTIA Network+ exam (N10-006). This concise review is the perfect companion to the CompTIA Network+ Study Guide and the CompTIA Network+ Deluxe Study Guide, with full exam coverage organized by objective for quick review and reinforcement of key topics. Each of the book's five parts is devoted to a specific domain area of the exam, providing a focused review to bolster areas of weak understanding. You get access to the Sybex test engine, which includes two bonus practice tests

  9. School Planning and Management Buyer's Guide 2000.

    Science.gov (United States)

    School Planning and Management, 1999

    1999-01-01

    Presents product information and a suppliers' directory for school purchasing managers for the year 2000, including a detailed product showcase and case histories and a section on descriptions of free brochures, pamphlets, and guides from key suppliers. An advertiser index concludes the issue. (GR)

  10. A review of treatment planning for precision image-guided photon beam pre-clinical animal radiation studies

    International Nuclear Information System (INIS)

    Verhaegen, Frank; Hoof, Stefan van; Granton, Patrick V.; Trani, Daniela

    2014-01-01

    Recently, precision irradiators integrated with a high-resolution CT imaging device became available for pre-clinical studies. These research platforms offer significant advantages over older generations of animal irradiators in terms of precision and accuracy of image-guided radiation targeting. These platforms are expected to play a significant role in defining experiments that will allow translation of research findings to the human clinical setting. In the field of radiotherapy, but also others such as neurology, the platforms create unique opportunities to explore e.g. the synergy between radiation and drugs or other agents. To fully exploit the advantages of this new technology, accurate methods are needed to plan the irradiation and to calculate the three-dimensional radiation dose distribution in the specimen. To this end, dedicated treatment planning systems are needed. In this review we will discuss specific issues for precision irradiation of small animals, we will describe the workflow of animal treatment planning, and we will examine several dose calculation algorithms (factorization, superposition-convolution, Monte Carlo simulation) used for animal irradiation with kilovolt photon beams. Issues such as dose reporting methods, photon scatter, tissue segmentation and motion will also be discussed briefly.

  11. 77 FR 8751 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-02-15

    ..., 40, 50, 70, and 72 [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY... Guide, DG-4014, ``Decommissioning Planning During Operations'' in the Federal Register with a public... Guide DG-4014, ``Decommissioning Planning During Operations.'' This DG refers to NUREG-1757 Volume 3...

  12. A Cost-Effective, In-House, Positioning and Cutting Guide System for Orthognathic Surgery.

    Science.gov (United States)

    McAllister, Peter; Watson, Melanie; Burke, Ezra

    2018-03-01

    Technological advances in 3D printing can dramatically improve orthognathic surgical planning workflow. Custom positioning and cutting guides enable intraoperative reproduction of pre-planned osteotomy cuts and can result in greater surgical accuracy and patient safety. This short paper describes the use of freeware (some with open-source) combined with in-house 3D printing facilities to produce reliable, affordable osteotomy cutting guides. Open-source software (3D Slicer) is used to visualise and segment three-dimensional planning models from imported conventional computed tomography (CT) scans. Freeware (Autodesk Meshmixer ©) allows digital manipulation of maxillary and mandibular components to plan precise osteotomy cuts. Bespoke cutting guides allow exact intraoperative positioning. These are printed in polylactic acid (PLA) using a fused-filament fabrication 3D printer. Fixation of the osteotomised segments is achieved using plating templates and four pre-adapted plates with planned screw holes over the thickest bone. We print maxilla/ mandible models with desired movements incorporated to use as a plating template. A 3D printer capable of reproducing a complete skull can be procured for £1000, with material costs in the region of £10 per case. Our production of models and guides typically takes less than 24 hours of total print time. The entire production process is frequently less than three days. Externally sourced models and guides cost significantly more, frequently encountering costs totalling £1500-£2000 for models and guides for a bimaxillary osteotomy. Three-dimensional guided surgical planning utilising custom cutting guides enables the surgeon to determine optimal orientation of osteotomy cuts and better predict the skeletal maxilla/mandible relationship following surgery. The learning curve to develop proficiency using planning software and printer settings is offset by increased surgical predictability and reduced theatre time, making this

  13. Teacher's Guide for Balloons and Gases.

    Science.gov (United States)

    Griffith, Joe H.; And Others

    This guide was developed to provide children with an opportunity to prepare and collect several common gases and to discover and work with some of their properties. The guide is divided into five major sections: (1) introduction, (2) materials, (3) activities, (4) balloons aloft, and (5) an appendix. The introduction provides information…

  14. Demystifying the Business Plan Process: An Introductory Guide.

    Science.gov (United States)

    Kuratko, Donald F.

    This article is designed as the starting point for writing a business plan. It first describes what a business plan is. These benefits are discussed: financing, increasing knowledge, preventing poor investment, and planning. A brief description follows of the 10 components of a business plan: executive summary; business description; marketing;…

  15. 78 FR 79688 - Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2013-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14-4-000] Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2015 Elko Area Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...

  16. Standard format and content for emergency plans for fuel cycle and materials facilities

    International Nuclear Information System (INIS)

    1990-09-01

    This regulatory guides is being developed to provide guidance acceptable to the NRC staff on the information to be included in emergency plans and to establish a format for presenting the information. Use of a standard format will help ensure uniformity and completeness in the preparation of emergency plans. An acceptable emergency plan should describe the licensed activities conducted at the facility and the types of accidents that might occur. It should provide information on classifying postulated accidents and the licensee's procedures for notifying and coordinating with offsite authorities. The plan should provide information on emergency response measures that might be necessary, the equipment and facilities available to respond to an emergency, and how the licensee will maintain emergency preparedness capability. It should describe the records and reports that will be maintained. There should also be a section on recovery after an accident and plans for restoring the facility to a safe condition. 4 refs

  17. Task 9. Deployment of photovoltaic technologies: co-operation with developing countries. PV for rural electrification in developing countries - Programme design, planning and implementation

    Energy Technology Data Exchange (ETDEWEB)

    Parker, W. [Institute for Sustainable Power, Highlands Ranch, CO (United States); Oldach, R.; Wilshaw, A. [IT Power Ltd, The Manor house, Chineham (United Kingdom)

    2003-09-15

    This report for the International Energy Agency (IEA) made by Task 9 of the Photovoltaic Power Systems (PVPS) programme takes a look at the design, planning and implementation of PV programmes. The guide contains details on the preparation for PV programmes, including the assessment of needs, stakeholder consultation, social context analysis, supply options and national policy considerations. The establishment of goals, delivery modes, timelines, logistics and quality assurance are discussed. Further, the implementation, monitoring and evaluation of PV programmes is discussed, as are a number of methodologies that have been developed with the aim of improving programme design and implementation. The guide highlights issues pertinent to rural energy programmes in developing countries and leads programme administrators through the process of planning, implementing and evaluating a PV programme.

  18. Utility planning for decommissioning

    International Nuclear Information System (INIS)

    Williams, D.H.

    1982-01-01

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  19. A novel dental implant guided surgery based on integration of surgical template and augmented reality.

    Science.gov (United States)

    Lin, Yen-Kun; Yau, Hong-Tzong; Wang, I-Chung; Zheng, Cheng; Chung, Kwok-Hung

    2015-06-01

    Stereoscopic visualization concept combined with head-mounted displays may increase the accuracy of computer-aided implant surgery. The aim of this study was to develop an augmented reality-based dental implant placement system and evaluate the accuracy of the virtually planned versus the actual prepared implant site created in vitro. Four fully edentulous mandibular and four partially edentulous maxillary duplicated casts were used. Six implants were planned in the mandibular and four in the maxillary casts. A total of 40 osteotomy sites were prepared in the casts using stereolithographic template integrated with augmented reality-based surgical simulation. During the surgery, the dentist could be guided accurately through a head-mounted display by superimposing the virtual auxiliary line and the drill stop. The deviation between planned and prepared positions of the implants was measured via postoperative computer tomography generated scan images. Mean and standard deviation of the discrepancy between planned and prepared sites at the entry point, apex, angle, depth, and lateral locations were 0.50 ± 0.33 mm, 0.96 ± 0.36 mm, 2.70 ± 1.55°, 0.33 ± 0.27 mm, and 0.86 ± 0.34 mm, respectively, for the fully edentulous mandible, and 0.46 ± 0.20 mm, 1.23 ± 0.42 mm, 3.33 ± 1.42°, 0.48 ± 0.37 mm, and 1.1 ± 0.39 mm, respectively, for the partially edentulous maxilla. There was a statistically significant difference in the apical deviation between maxilla and mandible in this surgical simulation (p augmented reality technology. © 2013 Wiley Periodicals, Inc.

  20. 77 FR 37032 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-14-000] Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned JL 47 Loop Project, Request for Comments on Environmental Issues, and Notice of Onsite Review The staff of the Federal Energy Regulatory Commission (FERC or Commissio...

  1. 75 FR 19641 - Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2010-04-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-5-000] Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga County Extension Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting April 7, 2010. The staff of the Federal Energy...

  2. Reviewing a Reading Program: Professional Development Module. Facilitator's Guide

    Science.gov (United States)

    Kosanovich, Marcia; Jordan, Georgia; Arndt, Elissa; VanSciver, Mary; Wahl, Michelle; Rissman, Lila

    2008-01-01

    This "Facilitator's Guide" has been prepared for presenters of the Reviewing a Reading Program professional development training. It is one of three pieces comprising a suite of materials on reviewing reading programs: this "Guide", the "Reviewing a Reading Program Participant's Guide" and the "Reviewing a Reading Program" Professional Development…

  3. Facility Effluent Monitoring Plan for the N Reactor

    International Nuclear Information System (INIS)

    Watson, D.J.; Brendel, D.F.; Shields, K.D.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The primary purpose of the N Reactor Facility Effluent Monitoring Plan (FEMP), during standby, is to ensure that the radioactive effluents are properly monitored and evaluated for compliance with the applicable DOE orders and regulatory agencies at the federal, state, and local levels. A secondary purpose of the FEMP is to ensure that hazardous wastes are not released, in liquid effluents, to the environment even though the potential to do so is extremely low. The FEMP is to provide a monitoring system that collects representative samples in accordance with industry standards, performs analyses within stringent quality control (QC) requirements, and evaluates the data through the use of comparative analysis with the standards and acceptable environmental models

  4. A user's guide to coping with estuarine management bureaucracy: An Estuarine Planning Support System (EPSS) tool.

    Science.gov (United States)

    Lonsdale, Jemma; Nicholson, Rose; Weston, Keith; Elliott, Michael; Birchenough, Andrew; Sühring, Roxana

    2018-02-01

    Estuaries are amongst the most socio-economically and ecologically important environments however, due to competing and conflicting demands, management is often challenging with a complex legislative framework managed by multiple agencies. To facilitate the understanding of this legislative framework, we have developed a GISbased Estuarine Planning Support System tool. The tool integrates the requirements of the relevant legislation and provides a basis for assessing the current environmental state of an estuary as well as informing and assessing new plans to ensure a healthy estuarine state. The tool ensures that the information is easily accessible for regulators, managers, developers and the public. The tool is intended to be adaptable, but is assessed using the Humber Estuary, United Kingdom as a case study area. The successful application of the tool for complex socio-economic and environmental systems demonstrates that the tool can efficiently guide users through the complex requirements needed to support sustainable development. Crown Copyright © 2017. Published by Elsevier Ltd. All rights reserved.

  5. Facility effluent monitoring plan for the 300 Area Fuels Fabrication Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Brendel, D.F.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring system by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The Fuel Fabrication Facility in the Hanford 300 Area supported the production reactors from the 1940's until they were shut down in 1987. Prior to 1987 the Fuel Fabrication Facility released both airborne and liquid radioactive effluents. In January 1987 the emission of airborne radioactive effluents ceased with the shutdown of the fuels facility. The release of liquid radioactive effluents have continued although decreasing significantly from 1987 to 1990

  6. Zeiss ΣIGMA VP-FE-SEM User Guide

    Science.gov (United States)

    User guide for analyzing carbon based nanomaterials on a Zeiss Sigma microscope. The guide includes helpful steps for sample preparation and loading. Specific topics utilizing the scanning electron microscope are instrumentation startup and imagining. A variety of detectors in...

  7. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  8. Automated replication of cone beam CT-guided treatments in the Pinnacle(3) treatment planning system for adaptive radiotherapy.

    Science.gov (United States)

    Hargrave, Catriona; Mason, Nicole; Guidi, Robyn; Miller, Julie-Anne; Becker, Jillian; Moores, Matthew; Mengersen, Kerrie; Poulsen, Michael; Harden, Fiona

    2016-03-01

    Time-consuming manual methods have been required to register cone-beam computed tomography (CBCT) images with plans in the Pinnacle(3) treatment planning system in order to replicate delivered treatments for adaptive radiotherapy. These methods rely on fiducial marker (FM) placement during CBCT acquisition or the image mid-point to localise the image isocentre. A quality assurance study was conducted to validate an automated CBCT-plan registration method utilising the Digital Imaging and Communications in Medicine (DICOM) Structure Set (RS) and Spatial Registration (RE) files created during online image-guided radiotherapy (IGRT). CBCTs of a phantom were acquired with FMs and predetermined setup errors using various online IGRT workflows. The CBCTs, DICOM RS and RE files were imported into Pinnacle(3) plans of the phantom and the resulting automated CBCT-plan registrations were compared to existing manual methods. A clinical protocol for the automated method was subsequently developed and tested retrospectively using CBCTs and plans for six bladder patients. The automated CBCT-plan registration method was successfully applied to thirty-four phantom CBCT images acquired with an online 0 mm action level workflow. Ten CBCTs acquired with other IGRT workflows required manual workarounds. This was addressed during the development and testing of the clinical protocol using twenty-eight patient CBCTs. The automated CBCT-plan registrations were instantaneous, replicating delivered treatments in Pinnacle(3) with errors of ±0.5 mm. These errors were comparable to mid-point-dependant manual registrations but superior to FM-dependant manual registrations. The automated CBCT-plan registration method quickly and reliably replicates delivered treatments in Pinnacle(3) for adaptive radiotherapy.

  9. Image-guided navigation system for placing dental implants.

    Science.gov (United States)

    Casap, Nardy; Wexler, Alon; Lustmann, Joshua

    2004-10-01

    Navigation-guided surgery has recently been introduced into various surgical disciplines, including oral and maxillofacial surgery. Since the advent of dental implants, dental computed tomography (CT) scans have been used as a diagnostic tool for preoperative planning, but not as part of the surgical phase. This article explains the principles of computer-assisted surgery and describes the use of a computer-guided navigation system in dental implantology. The system uses preoperative dental CT scans for planning and as an integral part of the surgical procedure. This system allows continuous intraoperative coordination of the implantation phase with the preoperative plan, optimizing the accuracy of implant surgery. Deviations from the planned location of the implants are minimal. Several cases are discussed.

  10. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  11. Access management in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  12. Route management in Safer Transportation Network Planning : safety principles, planning framework, and library information.

    NARCIS (Netherlands)

    Hummel, T.

    2001-01-01

    This report is one in a series of publications, used in the development of the network planning tool ‘Safer Transportation Network Planning’ (Safer-TNP). The publications were used to guide the development of planning structures, diagnostic tools, planning recommendations, and research information

  13. Combined Inter- and Intrafractional Plan Adaptation Using Fraction Partitioning in Magnetic Resonance-guided Radiotherapy Delivery.

    Science.gov (United States)

    Lagerwaard, Frank; Bohoudi, Omar; Tetar, Shyama; Admiraal, Marjan A; Rosario, Tezontl S; Bruynzeel, Anna

    2018-04-05

    Magnetic resonance-guided radiation therapy (MRgRT) not only allows for superior soft-tissue setup and online MR-guidance during delivery but also for inter-fractional plan re-optimization or adaptation. This plan adaptation involves repeat MR imaging, organs at risk (OARs) re-contouring, plan prediction (i.e., recalculating the baseline plan on the anatomy of that moment), plan re-optimization, and plan quality assurance. In contrast, intrafractional plan adaptation cannot be simply performed by pausing delivery at any given moment, adjusting contours, and re-optimization because of the complex and composite nature of deformable dose accumulation. To overcome this limitation, we applied a practical workaround by partitioning treatment fractions, each with half the original fraction dose. In between successive deliveries, the patient remained in the treatment position and all steps of the initial plan adaptation were repeated. Thus, this second re-optimization served as an intrafractional plan adaptation at 50% of the total delivery. The practical feasibility of this partitioning approach was evaluated in a patient treated with MRgRT for locally advanced pancreatic cancer (LAPC). MRgRT was delivered in 40Gy in 10 fractions, with two fractions scheduled successively on each treatment day. The contoured gross tumor volume (GTV) was expanded by 3 mm, excluding parts of the OARs within this expansion to derive the planning target volume for daily re-optimization (PTV OPT ). The baseline GTVV 95%  achieved in this patient was 80.0% to adhere to the high-dose constraints for the duodenum, stomach, and bowel (V 33 Gy ViewRay Inc, Mountain View, USA) using video-assisted breath-hold in shallow inspiration. The dual plan adaptation resulted, for each partitioned fraction, in the generation of Plan PREDICTED1 , Plan RE-OPTIMIZED1  (inter-fractional adaptation), Plan PREDICTED2 , and Plan RE-OPTIMIZED2  (intrafractional adaptation). An offline analysis was

  14. Guide for understanding and evaluation of safety culture

    International Nuclear Information System (INIS)

    2008-01-01

    This report was the guide of understanding and evaluation of safety culture. Operator's activities for enhancement of safety culture in nuclear installations became an object of safety regulation in the management system. Evaluation of operator's activities (including top management's involvement) to prevent degradation of safety culture and organization climate in daily works needed understanding of safety culture and diversity of operator's activities. This guide was prepared to check indications of degradation of safety culture and organization climate in operator's activities in daily works and encourage operator's activities to enhance safety culture improvement and good practice. Comprehensive evaluation of operator's activities to prevent degradation of safety culture and organization climate would be performed from the standpoints of 14 safety culture elements such as top management commitment, clear plan and implementation of upper manager, measures to avoid wrong decision making, questioning attitude, reporting culture, good communications, accountability and openness, compliance, learning system, activities to prevent accidents or incidents beforehand, self-assessment or third party evaluation, work management, change management and attitudes/motivation. Element-wise examples and targets for evaluation were attached with evaluation check tables. (T. Tanaka)

  15. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  16. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  17. Undergraduate surgical nursing preparation and guided operating room experience: A quantitative analysis.

    Science.gov (United States)

    Foran, Paula

    2016-01-01

    The aim of this research was to determine if guided operating theatre experience in the undergraduate nursing curricula enhanced surgical knowledge and understanding of nursing care provided outside this specialist area in the pre- and post-operative surgical wards. Using quantitative analyses, undergraduate nurses were knowledge tested on areas of pre- and post-operative surgical nursing in their final semester of study. As much learning occurs in nurses' first year of practice, participants were re-tested again after their Graduate Nurse Program/Preceptorship year. Participants' results were compared to the model of operating room education they had participated in to determine if there was a relationship between the type of theatre education they experienced (if any) and their knowledge of surgical ward nursing. Findings revealed undergraduates nurses receiving guided operating theatre experience had a 76% pass rate compared to 56% with non-guided or no experience (p nurses achieved a 100% pass rate compared to 53% with non-guided or no experience (p research informs us that undergraduate nurses achieve greater learning about surgical ward nursing via guided operating room experience as opposed to surgical ward nursing experience alone. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. An Implementation Guide for Intermodal Transportation Career Education. Revised Edition.

    Science.gov (United States)

    Associated Research Corp., South Miami, FL.

    One of a series devoted to career education in transportation, this teachers' guide, which is a revised edition of a guide issued in 1974, covers the planning, implementation, and evaluation of programs in transportation career education and provides forms to be used in these three processes. The most important principles in program planning are…

  19. Shutdown, dismantling and decommissioning of nuclear facilities in France - Guide no. 6 - Update of 30/08/2016

    International Nuclear Information System (INIS)

    2016-01-01

    After a recall of the regulatory context and references, this guide addresses the strategy for an immediate dismantling of an installation, the dismantling planning, the different phases of the end of life of nuclear base installations, the authorization of definitive stop and dismantling, the preliminary phase preparing the definitive stop (regulatory context, technical aspects), the dismantling phase (regulatory context, technical aspects for the concerned operations, the security functions, hardware important for security, taking ageing into account), and the final status of installations (downgrading, constraints)

  20. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  1. Edexcel A2 Physics Student Unit Guide

    CERN Document Server

    Benn, Mike

    2010-01-01

    Student Unit Guides are perfect for revision. Each guide is written by an examiner and explains the unit requirements, summarises the relevant unit content and includes a series of specimen questions and answers. There are three sections to each guide:. Introduction - includes advice on how to use the guide, an explanation of the skills being tested by the assessment objectives, an outline of the unit or module and, depending on the unit, suggestions for how to revise effectively and prepare for the examination questions. Content Guidance - provides an examiner's overview of the module's key t

  2. AQA A2 Chemistry Student Unit Guide

    CERN Document Server

    Cross, Margaret

    2010-01-01

    Student Unit Guides are perfect for revision. Each guide is written by an examiner and explains the unit requirements, summarises the relevant unit content and includes a series of specimen questions and answers. There are three sections to each guide:. Introduction - includes advice on how to use the guide, an explanation of the skills being tested by the assessment objectives, an outline of the unit or module and, depending on the unit, suggestions for how to revise effectively and prepare for the examination questions. Content Guidance - provides an examiner's overview of the module's key t

  3. Seismic Safety Guide

    International Nuclear Information System (INIS)

    Eagling, D.G.

    1985-01-01

    The Seismic Safety Guide provides facilities managers with practical guidelines for administering a comprehensive earthquake safety program. Most facilities managers, unfamiliar with earthquake engineering, tend to look for answers in techniques more sophisticated than required to solve the actual problems in earthquake safety. Often the approach to solutions to these problems is so academic, legalistic, and financially overwhelming that mitigation of actual seismic hazards simply does not get done in a timely, cost-effective way. The objective of the Guide is to provide practical advice about earthquake safety so that managers and engineers can get the job done without falling into common pitfalls, prolonged diagnosis, and unnecessary costs. It is comprehensive with respect to earthquakes in that it covers the most important aspects of natural hazards, site planning, rehabilitation of existing buildings, design of new facilities, operational safety, emergency planning, non-structural elements, life lines, and risk management. 5 references

  4. Environmental Compliance Guide

    International Nuclear Information System (INIS)

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects

  5. Environmental Compliance Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.

  6. Preparing Elementary Prospective Teachers to Teach Early Algebra

    Science.gov (United States)

    Hohensee, Charles

    2017-01-01

    Researchers have argued that integrating early algebra into elementary grades will better prepare students for algebra. However, currently little research exists to guide teacher preparation programs on how to prepare prospective elementary teachers to teach early algebra. This study examines the insights and challenges that prospective teachers…

  7. Commercial Foods and Culinary Arts. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for commercial foods and culinary arts. The guide contains the following sections: occupational description;…

  8. Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

    Energy Technology Data Exchange (ETDEWEB)

    Cornwell, Paris A [ORNL; Bunn, Jeffrey R [ORNL; Schmidlin, Joshua E [ORNL; Hubbard, Camden R [ORNL

    2012-04-01

    The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the

  9. Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

    International Nuclear Information System (INIS)

    Cornwell, Paris A.; Bunn, Jeffrey R.; Schmidlin, Joshua E.; Hubbard, Camden R.

    2012-01-01

    The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the scan arm creates. Once

  10. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  11. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  12. The job that no one wants to do? Museum educators’ articulations about guided tours

    Directory of Open Access Journals (Sweden)

    Cecilia Rodehn

    2017-03-01

    Full Text Available The aim of this paper is to investigate museum educators’ articulations of their performance during guided tours. The paper investigates preparations for a guided tour, considerations related to doing guided tours and the events after the guided tour. The text focus especially on preparation and the aftermath as this is not normally discussed in research on museum education. The paper is based on participant observation of guided tours, filming of guided tours and qualitative semi-structured interviews. The material is analysed using performance theories and theories on materiality. The paper seeks to unearth knowledge imbued in the museum educators’ performance and reveal what can be known from guiding bodies.

  13. 78 FR 35641 - Notice of Intent To Prepare an Amendment to the Mimbres Resource Management Plan and Associated...

    Science.gov (United States)

    2013-06-13

    ... Assessment for Possible Disposal of Public Land in Do[ntilde]a Ana County, Las Cruces, New Mexico AGENCY... Cruces District Office, New Mexico, intends to prepare a Resource Management Plan (RMP) Amendment with an associated Environmental Assessment (EA) to analyze the possible disposal by direct sale at fair market value...

  14. 77 FR 64824 - Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment...

    Science.gov (United States)

    2012-10-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 049584, L51010000.FX0000.LVRWB09B3130] Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment, and a Public Lands Segregation for the Proposed Soda Mountain Solar Project, CA AGENCY: Bureau of Land...

  15. An Automation Planning Primer.

    Science.gov (United States)

    Paynter, Marion

    1988-01-01

    This brief planning guide for library automation incorporates needs assessment and evaluation of options to meet those needs. A bibliography of materials on automation planning and software reviews, library software directories, and library automation journals is included. (CLB)

  16. Environment, Safety, and Health (ES&H) self-assessment guide

    Energy Technology Data Exchange (ETDEWEB)

    Reese, R.T.; Golden, N.L.; Romero, J.R.; Yesner, S.

    1997-06-01

    This document has been prepared as a guide for conducting self-assessments of ES&H functional programs and organizational (line) implementation of these programs. This guide is intended for use by individuals and/or teams involved in or familiar with ES&H programs and line operations (e.g., the {open_quotes}self{close_quotes}in self-assessment). Essential elements of the self-assessment process are described including: schedule and priorities, scope and approach, assessment criteria (e.g., performance objectives and measures), information gathering and analysis techniques, and documentation of planning efforts and results. The appendices in this guide include: (1) an assessment prioritization process, (2) generic performance objectives for line implementation and for ES&H functional programs, (3) sources for ES&H assessment information, (4) systemic factors (developed for SNL`s root cause analysis program), (5) Lockheed Martin audit questions for management systems, compliance and validation, and specific areas and concerns, (6) DOE facility representatives checklist, and (7) assessment tools and resources developed at SNL and other DOE/Lockheed Martin sites. This document is a product of the efforts associated with the SNL ES&H Oversight Pilot Project conducted from June 1995 to January 1997. This Pilot was part of the overall initiative by DOE to reduce burdensome agency oversight by placing greater reliance on contractor self-assessment.

  17. Measuring parent time scarcity and fatigue as barriers to meal planning and preparation: quantitative scale development.

    Science.gov (United States)

    Storfer-Isser, Amy; Musher-Eizenman, Dara

    2013-03-01

    To examine the psychometric properties of 9 quantitative items that assess time scarcity and fatigue as parent barriers to planning and preparing meals for their children. A convenience sample of 342 parents of children aged 2-6 years completed a 20-minute online survey. Exploratory factor analysis was used to examine the factor structure and create summary scales. Internal consistency reliability and measures of construct and concurrent validity were assessed. Two scales were created based on the factor analysis: time and energy for meals and meal planning. Preliminary evidence suggests that both scales are reliable and valid. The time and energy for meals and meal planning scales can be completed quickly by busy and tired parents. As many children do not eat nutritious diets, a better understanding of the barriers that parents face is critical and may help inform interventions tailored to the needs of tired, busy parents. Copyright © 2013 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  18. 75 FR 32962 - Notice of Intent To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico...

    Science.gov (United States)

    2010-06-10

    ... To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico and Associated Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY... associated Environmental Impact Statement (EIS) for the Carlsbad Field Office and by this notice is...

  19. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  20. Pandemic influenza preparedness: an ethical framework to guide decision-making

    Directory of Open Access Journals (Sweden)

    Gibson Jennifer L

    2006-12-01

    Full Text Available Abstract Background Planning for the next pandemic influenza outbreak is underway in hospitals across the world. The global SARS experience has taught us that ethical frameworks to guide decision-making may help to reduce collateral damage and increase trust and solidarity within and between health care organisations. Good pandemic planning requires reflection on values because science alone cannot tell us how to prepare for a public health crisis. Discussion In this paper, we present an ethical framework for pandemic influenza planning. The ethical framework was developed with expertise from clinical, organisational and public health ethics and validated through a stakeholder engagement process. The ethical framework includes both substantive and procedural elements for ethical pandemic influenza planning. The incorporation of ethics into pandemic planning can be helped by senior hospital administrators sponsoring its use, by having stakeholders vet the framework, and by designing or identifying decision review processes. We discuss the merits and limits of an applied ethical framework for hospital decision-making, as well as the robustness of the framework. Summary The need for reflection on the ethical issues raised by the spectre of a pandemic influenza outbreak is great. Our efforts to address the normative aspects of pandemic planning in hospitals have generated interest from other hospitals and from the governmental sector. The framework will require re-evaluation and refinement and we hope that this paper will generate feedback on how to make it even more robust.

  1. 76 FR 62055 - Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-10-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-6-000] Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Wabash Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  2. 76 FR 54758 - Alliance Pipeline L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-7-000] Alliance Pipeline L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission (FERC or...

  3. 75 FR 26220 - Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage...

    Science.gov (United States)

    2010-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Leader One Energy, LLC] Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage Project, Request for Comments on Environmental Issues, and Notice of a Site Visit April 30, 2010. The staff of the Federal Energy Regulatory Commission (FERC or...

  4. 75 FR 56089 - Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise...

    Science.gov (United States)

    2010-09-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-19-000] Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting September 3, 2010. The staff of the Federal Energy Regulatory...

  5. Hurricane Sandy science plan: coastal impact assessments

    Science.gov (United States)

    Stronko, Jakob M.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: coastal topography and bathymetry, impacts to coastal beaches and barriers, impacts of storm surge, including disturbed estuarine and bay hydrology, impacts on environmental quality and persisting contaminant exposures, impacts to coastal ecosystems, habitats, and fish and wildlife. This fact sheet focuses assessing impacts to coastal beaches and barriers.

  6. Guide to hazardous industrial activities: handbook for the cataloguing and selection of industrial activities for which an Emergency Management Plan ought to be drafted

    NARCIS (Netherlands)

    Ham, J.M.; Blom-Bruggeman, J.M.

    1989-01-01

    A methodology has been developed for the cataloguing of hazardous (industrial) activities and the evaluation of these activities as part of the process of formulating an emergency management plan. This guide will enable priorities to be set at local level (district, region) for the drafting of

  7. A Revised Guide for Improving Teacher Education in Human Rights.

    Science.gov (United States)

    Phi Delta Kappa, Bloomington, IN. Commission of Education, Human Rights, and Responsibilities.

    This document serves as a guide for teacher education institutions and programs designed to prepare educators for meeting their responsibilities in the area of human rights and human relations. This second edition of the guide represents a substantial modification of the original guide, and includes many activities, experiences, and suggestions…

  8. Accuracy of computer-guided implantation in a human cadaver model.

    Science.gov (United States)

    Yatzkair, Gustavo; Cheng, Alice; Brodie, Stan; Raviv, Eli; Boyan, Barbara D; Schwartz, Zvi

    2015-10-01

    To examine the accuracy of computer-guided implantation using a human cadaver model with reduced experimental variability. Twenty-eight (28) dental implants representing 12 clinical cases were placed in four cadaver heads using a static guided implantation template. All planning and surgeries were performed by one clinician. All radiographs and measurements were performed by two examiners. The distance of the implants from buccal and lingual bone and mesial implant or tooth was analyzed at the apical and coronal levels, and measurements were compared to the planned values. No significant differences were seen between planned and implanted measurements. Average deviation of an implant from its planning radiograph was 0.8 mm, which is within the range of variability expected from CT analysis. Guided implantation can be used safely with a margin of error of 1 mm. © 2014 The Authors. Clinical Oral Implants Research Published by John Wiley & Sons Ltd.

  9. The problem resident behavior guide: strategies for remediation.

    Science.gov (United States)

    Williamson, Kelly; Quattromani, Erin; Aldeen, Amer

    2016-04-01

    In 2012, the ACGME supplemented the core competencies with outcomes-based milestones for resident performance within the six competency domains. These milestones address the knowledge, skills, abilities, attitudes, and experiences that a resident is expected to progress through during the course of training. Even prior to the initiation of the milestones, there was a paucity of EM literature addressing the remediation of problem resident behaviors and there remain few readily accessible tools to aid in the implementation of a remediation plan. The goal of the "Problem Resident Behavior Guide" is to provide specific strategies for resident remediation based on deficiencies identified within the framework of the EM milestones. The "Problem Resident Behavior Guide" is a written instructional manual that provides concrete examples of remediation strategies to address specific milestone deficiencies. The more than 200 strategies stem from the experiences of the authors who have professional experience at three different academic hospitals and emergency medicine residency programs, supplemented by recommendations from educational leaders as well as utilization of valuable education adjuncts, such as focused simulation exercises, lecture preparation, and themed ED shifts. Most recommendations require active participation by the resident with guidance by faculty to achieve the remediation expectations. The ACGME outcomes-based milestones aid in the identification of deficiencies with regards to resident performance without providing recommendations on remediation. The Problem Resident Behavior Guide can therefore have a significant impact by filling in this gap.

  10. Standard guide for preparation of metallographic specimens

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2011-01-01

    1.1 The primary objective of metallographic examinations is to reveal the constituents and structure of metals and their alloys by means of a light optical or scanning electron microscope. In special cases, the objective of the examination may require the development of less detail than in other cases but, under nearly all conditions, the proper selection and preparation of the specimen is of major importance. Because of the diversity in available equipment and the wide variety of problems encountered, the following text presents for the guidance of the metallographer only those practices which experience has shown are generally satisfactory; it cannot and does not describe the variations in technique required to solve individual specimen preparation problems. Note 1—For a more extensive description of various metallographic techniques, refer to Samuels, L. E., Metallographic Polishing by Mechanical Methods, American Society for Metals (ASM) Metals Park, OH, 3rd Ed., 1982; Petzow, G., Metallographic Etchin...

  11. Records Management Handbook; Source Data Automation Equipment Guide.

    Science.gov (United States)

    National Archives and Records Service (GSA), Washington, DC. Office of Records Management.

    A detailed guide to selecting appropriate source data automation equipment is presented. Source data automation equipment is used to prepare data for electronic data processing or computerized recordkeeping. The guide contains specifications, performance data cost, and pictures of the major types of machines used in source data automation.…

  12. Risk management plan for the National Ignition Facility

    International Nuclear Information System (INIS)

    Brereton, S.; Lane, M.; Smith, C.; Yatabe, J.

    1998-01-01

    The National Ignition Facility (NIF) is a U.S. Department of Energy inertial confinement laser fusion facility, currently under construction at the Lawrence Livermore National Laboratory (LLNL). NIF is a critical tool for the Department of Energy (DOE) science- based Stockpile Stewardship and Management Program. In addition, it represents a major step towards realizing inertial confinement fusion as a source of energy. The NIF will focus 192 laser beams onto spherical targets containing a mixture of deuterium and tritium, causing them to implode. This will create the high temperatures and pressures necessary for these targets to undergo fusion. The plan is for NIF to achieve ignition (i.e., self-heating of the fuel) and energy gain (i.e., more fusion energy produced than laser energy deposited) in the laboratory for the first time. A Risk Management Plan was prepared for the NIF design and construction Project. The plan was prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide. The objectives of the plan were to: (1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, (2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES ampersand H (environment, safety and health), costs, and schedule, and (3) address each risk in terms of suitable risk management measures. Major risk elements were identified for the NIF Project. A risk assessment methodology was developed, which was utilized to rank the Project risks with respect to one another. Those elements presenting greater risk were readily identified by this process. This paper describes that methodology and the results

  13. Automatic treatment plan re-optimization for adaptive radiotherapy guided with the initial plan DVHs

    International Nuclear Information System (INIS)

    Li, Nan; Zarepisheh, Masoud; Uribe-Sanchez, Andres; Moore, Kevin; Tian, Zhen; Zhen, Xin; Graves, Yan Jiang; Gautier, Quentin; Mell, Loren; Jia, Xun; Jiang, Steve; Zhou, Linghong

    2013-01-01

    Adaptive radiation therapy (ART) can reduce normal tissue toxicity and/or improve tumor control through treatment adaptations based on the current patient anatomy. Developing an efficient and effective re-planning algorithm is an important step toward the clinical realization of ART. For the re-planning process, manual trial-and-error approach to fine-tune planning parameters is time-consuming and is usually considered unpractical, especially for online ART. It is desirable to automate this step to yield a plan of acceptable quality with minimal interventions. In ART, prior information in the original plan is available, such as dose–volume histogram (DVH), which can be employed to facilitate the automatic re-planning process. The goal of this work is to develop an automatic re-planning algorithm to generate a plan with similar, or possibly better, DVH curves compared with the clinically delivered original plan. Specifically, our algorithm iterates the following two loops. An inner loop is the traditional fluence map optimization, in which we optimize a quadratic objective function penalizing the deviation of the dose received by each voxel from its prescribed or threshold dose with a set of fixed voxel weighting factors. In outer loop, the voxel weighting factors in the objective function are adjusted according to the deviation of the current DVH curves from those in the original plan. The process is repeated until the DVH curves are acceptable or maximum iteration step is reached. The whole algorithm is implemented on GPU for high efficiency. The feasibility of our algorithm has been demonstrated with three head-and-neck cancer IMRT cases, each having an initial planning CT scan and another treatment CT scan acquired in the middle of treatment course. Compared with the DVH curves in the original plan, the DVH curves in the resulting plan using our algorithm with 30 iterations are better for almost all structures. The re-optimization process takes about 30

  14. The site-characterization plan and its role in resolving siting and licensing issues

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1986-01-01

    As required by the Nuclear Waste Policy Act and the Nuclear Regulatory Commission (NRC) in 10 CFR Part 60, the Department of Energy is preparing plans for conducting site characterization at three candidate sites. Prepared according to a detailed annotated outline that is based on the NRC's Regulatory Guide 4.17, these plans will present the information collected to date about the geologic, hydrologic, geochemical, geoengineering, and climatic conditions of each site; describe the design of the repository and the waste package; and discuss the site-characterization program. The most important portions of the plan will be the strategy for resolving siting and licensing issues and the description of the testing and analysis program to be followed in resolving these issues. The issues-resolution strategy consists of identifying issues and the associated information needs; allocating performance goals for various components of the repository system; developing a testing plan to gather the necessary information; gathering and analyzing the information; and documenting the results for use in site selection and licensing. The issues-resolution strategy will allow the Department to define all of the issues that must be resolved in order to demonstrate compliance with applicable regulations and to specify the information needed to resolve these issues. It will provide a consistent framework and establish priorities for the Department's site-characterization effort for the next several years

  15. 16 CFR 240.8 - Need for a plan.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Need for a plan. 240.8 Section 240.8 Commercial Practices FEDERAL TRADE COMMISSION GUIDES AND TRADE PRACTICE RULES GUIDES FOR ADVERTISING ALLOWANCES AND OTHER MERCHANDISING PAYMENTS AND SERVICES § 240.8 Need for a plan. A seller who makes payments...

  16. Design guides for radioactive-material-handling facilities and equipment

    International Nuclear Information System (INIS)

    Doman, D.R.; Barker, R.E.

    1980-01-01

    Fourteen key areas relating to facilities and equipment for handling radioactive materials involved in examination, reprocessing, fusion fuel handling and remote maintenance have been defined and writing groups established to prepare design guides for each areas. The guides will give guidance applicable to design, construction, operation, maintenance and safety, together with examples and checklists. Each guide will be reviewed by an independent review group. The guides are expected to be compiled and published as a single document

  17. Preparing for a Pandemic Flu Outbreak

    Science.gov (United States)

    Dittbenner, Richard

    2009-01-01

    This article discusses the things college leaders should know and do in case of a pandemic influenza outbreak. The author talks about four principles that will guide college leaders in developing a pandemic influenza plan and presents the 10 elements of an effective college pandemic planning process.

  18. Guided preparedness planning with lay communities: enhancing capacity of rural emergency response through a systems-based partnership.

    Science.gov (United States)

    McCabe, O Lee; Perry, Charlene; Azur, Melissa; Taylor, Henry G; Gwon, Howard; Mosley, Adrian; Semon, Natalie; Links, Jonathan M

    2013-02-01

    Community disaster preparedness plans, particularly those with content that would mitigate the effects of psychological trauma on vulnerable rural populations, are often nonexistent or underdeveloped. The purpose of the study was to develop and evaluate a model of disaster mental health preparedness planning involving a partnership among three, key stakeholders in the public health system. A one-group, post-test, quasi-experimental design was used to assess outcomes as a function of an intervention designated Guided Preparedness Planning (GPP). The setting was the eastern-, northern-, and mid-shore region of the state of Maryland. Partner participants were four local health departments (LHDs), 100 faith-based organizations (FBOs), and one academic health center (AHC)-the latter, collaborating entities of the Johns Hopkins University and the Johns Hopkins Health System. Individual participants were 178 community residents recruited from counties of the above-referenced geographic area. Effectiveness of GPP was based on post-intervention assessments of trainee knowledge, skills, and attitudes supportive of community disaster mental health planning. Inferences about the practicability (feasibility) of the model were drawn from pre-defined criteria for partner readiness, willingness, and ability to participate in the project. Additional aims of the study were to determine if LHD leaders would be willing and able to generate post-project strategies to perpetuate project-initiated government/faith planning alliances (sustainability), and to develop portable methods and materials to enhance model application and impact in other health jurisdictions (scalability). The majority (95%) of the 178 lay citizens receiving the GPP intervention and submitting complete evaluations reported that planning-supportive objectives had been achieved. Moreover, all criteria for inferring model feasibility, sustainability, and scalability were met. Within the span of a six-month period

  19. Effects of Manufacturing Firm’s Capacity Planning on Performance of the Firm

    Directory of Open Access Journals (Sweden)

    Kifordu Anthony

    2017-12-01

    Full Text Available This study investigated capacity planning and performance in the manufacturing sector in the Southeastern States of Nigeria based on selected Brewing industries. The population of the study was 740 staff of the brewing industry in South-Eastearn Nigeria. The sample size of 509 was obtained using a Taro Yamani’s statistical formula. The study used questionnaire and oral interview guide for data gathering. A test- retest stood completed using Spearman’s rank correlation, giving a coefficient of 0.9. Findings revealed that capacity planning significantly enriched economic performance of the industry studied. There existed a strong affirmative relationship among capacity necessities planning and resources requirements planning. The paper suggested use of capacity planning as a technique to improve all performance factors. Similarly, performance advantage subsist from the correlation of volume requirements plans and resources requirements planning. The paper summarily held the position that volume preparation improved the economic performance in the industry under review. This inferred that goals achievement is possible. Likewise, the finding of substantial constructive association between volume supplies planning and resources supplies planning inferred an affirmative communication between the variables. This meant that resources supplies planning which was a method of organizing the detailed production plans could lead to an improvement of capacity supplies planning. That is to say, they are taking future decisions on the substances required for production capability of the brewing facility.

  20. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2004-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  1. Contents of management plans for incidents and accidents involving the transport of radioactive substances. Guide no. 17, Version of 22/12/2014

    International Nuclear Information System (INIS)

    2014-01-01

    This guide presents the essential topics to be developed in a management plan for incidents and accidents involving the transport of radioactive substances for civil use. It does not aim to be exhaustive and could be added to by each party involved in the transport, who can make the necessary adaptations and additions, taking account of the particularities of its shipments and its organisation, as well as those of the company or group to which it belongs. The radioactive substances transport incident and accident management plan is a document comprising a descriptive part and an operational part. It presents the overall response of the party involved in the transport operation to an incident or accident situation concerning one of its shipments and the steps it intends to make in order to support the authorities in charge of this situation, in the best possible conditions. This response is designed to cover the cases of incidents or accidents whether or not they lead to a radiological emergency situation. The guide exclusively concerns: - road transport; - rail transport; - the 'road' and 'rail' parts of multimodal transport operations. The case of an incident or an accident occurring during a particular stop such as a transit site, in a transhipment area (port, airport, railway station, etc.), or in a transport infrastructure, is also covered by the radioactive substances transport incident and accident management plan, which then supports the entities in charge of managing this situation (operator of the transhipment area or the transport infrastructure and - as applicable - their supervisory authorities). The level of risk associated with transport incidents and accidents varies widely, according to the nature and quantities of the materials being carried, the number of shipments made and the package model used. The incident and accident management plan must therefore be tailored to the specific nature of the shipments by the party concerned. The radioactive

  2. OCR(A) A2 Physics Student Unit Guide

    CERN Document Server

    Chadha, Gurinder

    2009-01-01

    Student Unit Guides are perfect for revision. Each guide is written by an examiner and explains the unit requirements, summarises the relevant unit content and includes a series of specimen questions and answers. There are three sections to each guide:. Introduction - includes advice on how to use the guide, an explanation of the skills being tested by the assessment objectives, an outline of the unit or module and, depending on the unit, suggestions for how to revise effectively and prepare for the examination questions. Content Guidance - provides an examiner's overview of the module's key t

  3. Guide for the preparation of applications for licenses for the use of self-contained dry source-storage irradiators. Second proposed Revision 1

    International Nuclear Information System (INIS)

    Bassin, N.

    1984-10-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of self-contained dry source-storage irradiators. These irradiators are constructed so that the sealed sources and the material being irradiated are contained in a shielded volume and there is no external radiation beam during the use of the irradiator. The radioisotopes most commonly used for these irradiators are cobalt-60 and cesium-137

  4. Effect of the PREPARE Website vs an Easy-to-Read Advance Directive on Advance Care Planning Documentation and Engagement Among Veterans: A Randomized Clinical Trial.

    Science.gov (United States)

    Sudore, Rebecca L; Boscardin, John; Feuz, Mariko A; McMahan, Ryan D; Katen, Mary T; Barnes, Deborah E

    2017-08-01

    Documentation rates of patients' medical wishes are often low. It is unknown whether easy-to-use, patient-facing advance care planning (ACP) interventions can overcome barriers to planning in busy primary care settings. To compare the efficacy of an interactive, patient-centered ACP website (PREPARE) with an easy-to-read advance directive (AD) to increase planning documentation. This was a comparative effectiveness randomized clinical trial from April 2013 to July 2016 conducted at multiple primary care clinics at the San Francisco VA Medical Center. Inclusion criteria were age of a least 60 years; at least 2 chronic and/or serious conditions; and 2 or more primary care visits; and 2 or more additional clinic, hospital, or emergency room visits in the last year. Participants were randomized to review PREPARE plus an easy-to-read AD or the AD alone. There were no clinician and/or system-level interventions or education. Research staff were blinded for all follow-up measurements. The primary outcome was new ACP documentation (ie, legal forms and/or discussions) at 9 months. Secondary outcomes included patient-reported ACP engagement at 1 week, 3 months, and 6 months using validated surveys of behavior change process measures (ie, 5-point knowledge, self-efficacy, readiness scales) and action measures (eg, surrogate designation, using a 0-25 scale). We used intention-to-treat, mixed-effects logistic and linear regression, controlling for time, health literacy, race/ethnicity, baseline ACP, and clustering by physician. The mean (SD) age of 414 participants was 71 (8) years, 38 (9%) were women, 83 (20%) had limited literacy, and 179 (43%) were nonwhite. No participant characteristic differed significantly among study arms at baseline. Retention at 6 months was 90%. Advance care planning documentation 6 months after enrollment was higher in the PREPARE arm vs the AD-alone arm (adjusted 35% vs 25%; odds ratio, 1.61 [95% CI, 1.03-2.51]; P = .04). PREPARE also resulted

  5. A "how-to" guide in preparing abstracts and poster presentations.

    Science.gov (United States)

    Boullata, Joseph I; Mancuso, Carissa E

    2007-12-01

    The preparation of an abstract or poster to share information from a project or case report with colleagues is a professional goal for many nutrition support practitioners. This paper provides an approach to help practitioners prepare an abstract for submission and subsequently a poster for presentation at a meeting. A nutrition support question that required collecting and evaluating information, or a unique patient case or case series, can serve as the focus of an abstract and subsequent poster. The professional meeting selected should be appropriate for the abstract topic, and the authors should closely adhere to the organization's abstract submission guidelines. The well-prepared abstract will then serve as the outline for the poster content; the visual aspect of the poster is also important to effectively communicate the information to colleagues at the meeting. Adequate time is required to prepare both the abstract and the poster in order to fittingly reflect the value of the information. Efforts in preparing the abstract will be worthwhile once the abstract has been accepted by reviewers for a poster session at the meeting. Likewise, the effort in preparing the poster in advance allows the presenter to enjoy the poster session and discuss the project with colleagues.

  6. Creating a Marketing Plan.

    Science.gov (United States)

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  7. Microsoft SharePoint 2013 disaster recovery guide

    CERN Document Server

    Ward, Peter

    2013-01-01

    The style and approach of the book is an easytoread SharePoint admin guide. This is not a stepbystep instruction book, but rather a guide on how to implement and execute a disaster recovery plan to your SharePoint environment.This book is great for both SharePoint and SQL administrators new to the SharePoint 2013 architecture, and who are looking to get a good grounding in how to use implement a solid disaster recoveryrecovery plan. It's assumed that you have some experience in SharePoint and Windows Server and, as well be familiar with SQL.

  8. Disclosing medical mistakes: a communication management plan for physicians.

    Science.gov (United States)

    Petronio, Sandra; Torke, Alexia; Bosslet, Gabriel; Isenberg, Steven; Wocial, Lucia; Helft, Paul R

    2013-01-01

    There is a growing consensus that disclosure of medical mistakes is ethically and legally appropriate, but such disclosures are made difficult by medical traditions of concern about medical malpractice suits and by physicians' own emotional reactions. Because the physician may have compelling reasons both to keep the information private and to disclose it to the patient or family, these situations can be conceptualized as privacy dilemmas. These dilemmas may create barriers to effectively addressing the mistake and its consequences. Although a number of interventions exist to address privacy dilemmas that physicians face, current evidence suggests that physicians tend to be slow to adopt the practice of disclosing medical mistakes. This discussion proposes a theoretically based, streamlined, two-step plan that physicians can use as an initial guide for conversations with patients about medical mistakes. The mistake disclosure management plan uses the communication privacy management theory. The steps are 1) physician preparation, such as talking about the physician's emotions and seeking information about the mistake, and 2) use of mistake disclosure strategies that protect the physician-patient relationship. These include the optimal timing, context of disclosure delivery, content of mistake messages, sequencing, and apology. A case study highlighted the disclosure process. This Mistake Disclosure Management Plan may help physicians in the early stages after mistake discovery to prepare for the initial disclosure of a medical mistakes. The next step is testing implementation of the procedures suggested.

  9. Guide to the TEAC Audit, 2011-2012

    Science.gov (United States)

    Teacher Education Accreditation Council, 2011

    2011-01-01

    This guide to the Teacher Education Accreditation Council (TEAC) audit is primarily for the faculty, staff, and administrators of TEAC member programs preparing for the audit of their "Inquiry Brief" or "Inquiry Brief Proposal." It is designed for use in preparing for the audits that are part of both initial and continuing…

  10. Strategic planning in an academic radiation medicine program.

    Science.gov (United States)

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  11. NPAS Users Guide

    International Nuclear Information System (INIS)

    1984-01-01

    This NPAS Users Guide is primarily intended as a source of information about policies, procedures, and facilities appropriate for users in the program of Nuclear Physics at SLAC (NPAS). General policies and practices are described, the preparation of proposals is discussed, and the services for users is outlined. SLAC experimental facilities are described, and contacts are listed

  12. An overview and guide: planning instructional radio.

    Science.gov (United States)

    Imhoof, M

    1984-03-01

    Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social

  13. Occupational and health safety guide for the study and recovery of contaminated land; Pilaantuneen maa-alueen tutkimuksen ja kunnostuksen tyoesuojeluopas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The guide reviews the accident and health hazards associated with the study and recovery of contaminated land and contains instructions for their assessment and prevention. The subject is approached in terms of risk management. Risk management involves not only the recognition of hazard and stress factors but also the methods of the assessment of the severity and significance of the risks and the risk management methods. The guide re-views the different risk factors in their appropriate subcategories: biological, physical, chemical and accident hazards. Work-related mental and physical stress is also addressed briefly. In the process of the study and recovery of contaminated land, it is important to plan the measures carefully in advance and to prepare for unexpected hazardous situations with appropriate precautions and personal protective equipment. The guide also addresses the responsibilities and duties of the project's operators. Other subjects include communication, orientation and occupational health responsibilities, for instance health inspections, vaccinations, exposure measurements and measures to be taken in case of accident. The guide also describes five typical recovery projects with their proper risk management measures. (orig.)

  14. Interpreter's Guide to Blackbird Marsh Nature Trail.

    Science.gov (United States)

    Environmental Studies Center, Pensacola, FL.

    This booklet was prepared to help the user interpret the natural history of Blackbird Marsh Nature Trail in Escambia County, Florida, and serves as a guide to the animal and plant life. The publication is part of a series of illustrated guides designed for use by teachers and students of all levels in conjunction with field trips to the 1200-acre…

  15. Functional Image-Guided Radiotherapy Planning in Respiratory-Gated Intensity-Modulated Radiotherapy for Lung Cancer Patients With Chronic Obstructive Pulmonary Disease

    Energy Technology Data Exchange (ETDEWEB)

    Kimura, Tomoki, E-mail: tkkimura@hiroshima-u.ac.jp [Department of Radiation Oncology, Hiroshima University, Graduate School of Biomedical Sciences, Hiroshima City (Japan); Nishibuchi, Ikuno; Murakami, Yuji; Kenjo, Masahiro; Kaneyasu, Yuko; Nagata, Yasushi [Department of Radiation Oncology, Hiroshima University, Graduate School of Biomedical Sciences, Hiroshima City (Japan)

    2012-03-15

    Purpose: To investigate the incorporation of functional lung image-derived low attenuation area (LAA) based on four-dimensional computed tomography (4D-CT) into respiratory-gated intensity-modulated radiotherapy (IMRT) or volumetric modulated arc therapy (VMAT) in treatment planning for lung cancer patients with chronic obstructive pulmonary disease (COPD). Methods and Materials: Eight lung cancer patients with COPD were the subjects of this study. LAA was generated from 4D-CT data sets according to CT values of less than than -860 Hounsfield units (HU) as a threshold. The functional lung image was defined as the area where LAA was excluded from the image of the total lung. Two respiratory-gated radiotherapy plans (70 Gy/35 fractions) were designed and compared in each patient as follows: Plan A was an anatomical IMRT or VMAT plan based on the total lung; Plan F was a functional IMRT or VMAT plan based on the functional lung. Dosimetric parameters (percentage of total lung volume irradiated with {>=}20 Gy [V20], and mean dose of total lung [MLD]) of the two plans were compared. Results: V20 was lower in Plan F than in Plan A (mean 1.5%, p = 0.025 in IMRT, mean 1.6%, p = 0.044 in VMAT) achieved by a reduction in MLD (mean 0.23 Gy, p = 0.083 in IMRT, mean 0.5 Gy, p = 0.042 in VMAT). No differences were noted in target volume coverage and organ-at-risk doses. Conclusions: Functional IGRT planning based on LAA in respiratory-guided IMRT or VMAT appears to be effective in preserving a functional lung in lung cancer patients with COPD.

  16. Hurricane Sandy science plan: impacts of environmental quality and persisting contaminant exposure

    Science.gov (United States)

    Caskie, Sarah A.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: • Coastal topography and bathymetry

  17. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  18. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  19. CompTIA network+ study guide exam N10-006

    CERN Document Server

    Lammle, Todd

    2015-01-01

    All-star N10-006 prep, fully updated for the new exam The CompTIA Network+ Study Guide is your one-stop comprehensive resource in preparing for exam N10-006 Bestselling author and networking Guru Todd Lammle guides you through 100% of all exam objectives detailing the fundamental concepts you will need to know to prepare for the exam. Coverage includes network technologies, installation and configuration, media and topologies, security, and much more, plus practical examples drawn from real-world situations. You also gain access to practice exams and electronic flashcards that facilitate info

  20. Apparel. Teacher's Instructional Guide.

    Science.gov (United States)

    Rambo, Patti

    This instructional guide for a one-half credit technological laboratory course for grades 10-12 focuses on apparel from the perspectives of personal decision making related to apparel, the apparel industry, and career preparation. Introductory materials are a course description; overview of course design; facilities, equipment, and resources; and…

  1. Fashion Merchandising: A Suggested Program Guide. Fashion Industry Series No. 4.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The fashion merchandising guide is the fourth of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. The job-preparatory guide is intended to provide youths and adults with intensive preparation for initial entry employment and also with career advancement opportunities within the…

  2. Textile Design: A Suggested Program Guide. Fashion Industry Series No. 3.

    Science.gov (United States)

    Fashion Inst. of Tech., New York, NY.

    The textile design guide is the third of a series of five interrelated program resource guides encompassing the various dimensions of the fashion industry. The job-preparatory guide is conceived to provide youth and adults with intensive preparation for initial entry employment and also with career advancement opportunities within specific…

  3. AKRO: Guided Angler Fish Landings

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Beginning in 2014, the the halibut Catch Sharing Plan (CSP) authorizes annual transfers of commercial halibut IFQ as guided angler fish (GAF) to charter halibut...

  4. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  5. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  6. A Plan-Do-Study-Act Approach to Improving Bowel Preparation Quality.

    Science.gov (United States)

    Calderwood, Audrey H; Mahoney, Elaine M; Jacobson, Brian C

    Up to 20% of patients presenting for colonoscopy have inadequate bowel cleanliness. In this study, the Plan-Do-Study-Act quality improvement process was used to improve bowel cleanliness among outpatients undergoing screening colonoscopy at Boston Medical Center. Rates of inadequate bowel cleanliness were assessed at baseline (April 2010 to September 2012), during several rapid-cycle experiments (October 2012 to September 2013), and through an observation phase (October 2013 to September 2015). The baseline rate of inadequate cleanliness was 9% with a target of 5%. Gap analysis identified 3 areas amenable to specific interventions: contacting patients, commitment to the procedure, and complexity and variation in instructions. Rates of inadequate cleanliness decreased to 4% at the end of the last intervention, but began rising for new reasons. Standardizing instructions and the use of navigators improved preparation quality. Bowel cleanliness is the end result of a multistep process with areas for improvement at many levels. Long-term monitoring is required to ensure ongoing success.

  7. Treatment planning for image-guided neuro-vascular interventions using patient-specific 3D printed phantoms

    Science.gov (United States)

    Russ, M.; O'Hara, R.; Setlur Nagesh, S. V.; Mokin, M.; Jimenez, C.; Siddiqui, A.; Bednarek, D.; Rudin, S.; Ionita, C.

    2015-03-01

    Minimally invasive endovascular image-guided interventions (EIGIs) are the preferred procedures for treatment of a wide range of vascular disorders. Despite benefits including reduced trauma and recovery time, EIGIs have their own challenges. Remote catheter actuation and challenging anatomical morphology may lead to erroneous endovascular device selections, delays or even complications such as vessel injury. EIGI planning using 3D phantoms would allow interventionists to become familiarized with the patient vessel anatomy by first performing the planned treatment on a phantom under standard operating protocols. In this study the optimal workflow to obtain such phantoms from 3D data for interventionist to practice on prior to an actual procedure was investigated. Patientspecific phantoms and phantoms presenting a wide range of challenging geometries were created. Computed Tomographic Angiography (CTA) data was uploaded into a Vitrea 3D station which allows segmentation and resulting stereo-lithographic files to be exported. The files were uploaded using processing software where preloaded vessel structures were included to create a closed-flow vasculature having structural support. The final file was printed, cleaned, connected to a flow loop and placed in an angiographic room for EIGI practice. Various Circle of Willis and cardiac arterial geometries were used. The phantoms were tested for ischemic stroke treatment, distal catheter navigation, aneurysm stenting and cardiac imaging under angiographic guidance. This method should allow for adjustments to treatment plans to be made before the patient is actually in the procedure room and enabling reduced risk of peri-operative complications or delays.

  8. UOP HRM 300 Final Exam Guide (New, 2017) NEW

    OpenAIRE

    ADMIN

    2018-01-01

    UOP HRM 300 Final Exam Guide (New, 2017) NEW Check this A+ tutorial guideline at http://www.hrm300assignment.com/hrm-300-uop/hrm-300-final-exam-guide-latest For more classes visit http://www.hrm300assignment.com True and False: Please mark either T or F in the appropriate space before the question 1. ____A strategic plan is the company’s plan for how it will match its internal strengths and weaknesses with external opportunities and threats in or...

  9. Configuration management plan for the GENII software

    International Nuclear Information System (INIS)

    Rittmann, P.D.

    1994-01-01

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user's input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user's input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user's guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan

  10. Preparing Patients for Cancer Chemotherapy: Effect of Coping Preparation and Relaxation Interventions.

    Science.gov (United States)

    Burish, Thomas G.; And Others

    1991-01-01

    Sixty cancer chemotherapy patients were randomly assigned to one of four treatments: relaxation training with guided relaxation imagery (RT), general coping preparation (PREP), both RT and PREP, or routine clinic treatment only. Found that PREP intervention increased patients' knowledge of disease and treatment, reduced anticipatory side effects,…

  11. A Guide to Parent Observation in the Primary Class

    Science.gov (United States)

    Battle, Judy Shepps

    2016-01-01

    Just as the classroom guide must prepare for observation in the classroom, so too should parents prepare themselves for classroom observation. What is the purpose of their observation? What is the procedure? What should they note? What points of awareness should they keep in mind? Using the format of a letter to parents preparing to observe in a…

  12. Improving the Impact of Extension through the Use of Anticipation Guides

    Science.gov (United States)

    Smith, Rebecca C.; Lemley, Stephanie M.

    2017-01-01

    In this article, we present the anticipation guide as a tool for preparing Extension audiences to learn the main points of Extension materials. Anticipation guides improve learner comprehension by appealing to an individual's natural curiosity and helping the individual focus on key ideas. Anticipation guides can be used with all types of…

  13. NATO Allied Medical Publication 7.5 (AMedP 7.5) NATO Planning Guide for the Estimation of CBRN Casualties

    Science.gov (United States)

    2016-12-01

    PROMULGATION [ Date ] 1. The enclosed Allied Medical Publication AMedP-7.5, NATO Planning Guide for the Estimation of CBRN Casualties, which has been... radioisotopes modeled are 60Co, 90Sr, 99Mo, 125I, 131I, 137Cs, 192Ir, 226Ra, 238Pu, 241Am, 252Cf. 2) Whole-body irradiation (from cloudshine, groundshine,9... Earth Shelter 16.67 66.67 Exposed/Dismounted 1.00 1.00 Foxhole (nuclear only)† 3.00 10.00 Masonry Building 8.33 6.67 Multi-Story Brick Building 1.33

  14. Facility effluent monitoring plan for the tank farms facilities

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.; Kenoyer, J.L.; Moeller, M.P.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum three years. A variety of liquid wastes are generated in processing treatment, and disposal operations throughout the Hanford Site. The Tank Farms Project serves a major role in Hanford Site waste management activities as the temporary repository for these wastes. Stored wastes include hazardous components regulated under the Resource Conservation and Recovery Act of 1976 (RCRA) and as by-product material regulated under the Atomic Energy Act of 1954. A total of 177 single- and double-shell tanks (SST and DST) have been constructed in the 200 East and 200 West Areas of the Hanford Site. These facilities were constructed to various designs from 1943 to 1986. The Tank Farms Project is comprised of these tanks along with various transfer, receiving, and treatment facilities

  15. Development and Implementation of an Ultrasound-Guided Peripheral Intravenous Catheter Program for Emergency Nurses.

    Science.gov (United States)

    Edwards, Courtney; Jones, Jodi

    2018-01-01

    Emergency medical care often necessitates placement of peripheral intravenous (PIV) catheters. When traditional methods for obtaining PIV access are not successful, ultrasound guidance is a rescue technique for peripheral vascular placement that improves the quality of patient care. The aim of this training program was to develop a process where emergency nurses would be competent to perform ultrasound guided PIV to improve the quality of patient care delivered while reducing throughput time. Administrative program development required creating a nursing practice statement, procedure guideline, operational plan, and competency validation. A training program comprising both didactic and hands-on training was developed and provided by emergency medicine physicians with formal ultrasound fellowship training. In determining whether the training program was adequate in preparing the student to place an ultrasound-guided PIV, 92.9% of students "agreed" or "strongly agreed." In having confidence in their ability to obtain an ultrasound guided PIV catheter placement, 35.7% of respondents "agreed" and 64.3% "strongly agreed." In finding it difficult to be successful in achieving ultrasound guided PIV catheter placement, 71.4% of students "strongly disagreed" and 14.3% "disagreed." All students (100%) felt it was a feasible task to train nurses to successfully place ultrasound-guided PIV catheters and 71.4% of students strongly support continuing to provide this training program and competency validation. Establishment of an effective didactic and hands-on training program resulted in emergency department nurses becoming competent in placement of ultrasound guided PIV catheters to provide optimal patient care. Copyright © 2017 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  16. [Guided maxillofacial surgery: Simulation and surgery aided by stereolithographic guides and custom-made miniplates.

    Science.gov (United States)

    Philippe, B

    2013-08-05

    We present a new model of guided surgery, exclusively using computer assistance, from the preoperative planning of osteotomies to the actual surgery with the aid of stereolithographic cutting guides and osteosynthetic miniplates designed and made preoperatively, using custom-made titanium miniplates thanks to direct metal laser sintering. We describe the principles that guide the designing and industrial manufacturing of this new type of osteosynthesis miniplates. The surgical procedure is described step-by-step using several representative cases of dento-maxillofacial dysmorphosis. The encouraging short-term results demonstrate the wide range of application of this new technology for cranio-maxillofacial surgery, whatever the type of osteotomy performed, and for plastic reconstructive surgery. Copyright © 2013. Published by Elsevier Masson SAS.

  17. Hospitality Occupations. Curriculum Guide.

    Science.gov (United States)

    California State Dept. of Education, Sacramento. Bureau of Homemaking Education.

    This curriculum guide on the hospitality occupations was developed to help secondary and postsecondary home economics teachers prepare individuals for entry-level jobs in the hospitality industry. The content is in seven sections. The first section presents organizational charts of a medium-size hotel, food and beverage division, housekeeping and…

  18. Latin Curriculum Guide.

    Science.gov (United States)

    North Carolina State Dept. of Public Instruction, Raleigh. Instructional Services.

    North Carolina's Latin curriculum guide describes the overarching concepts for Latin study, particularly at the secondary level, and outlines what students should know and be able to do at the beginning, intermediate, and advanced levels. It is designed to provide directions to school districts as they plan and/or continue to improve their Latin…

  19. Strategic planning in an academic radiation medicine program

    Science.gov (United States)

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  20. Guide for preparing annual reports on radiation-safety testing of electronic products (general)

    International Nuclear Information System (INIS)

    1987-10-01

    For manufacturers of electronic products other than those for which a specific guide has been issued, the guide replaces the Guide for the Filing of Annual Reports (21 CFR Subchapter J, Section 1002.11), HHS Publication FDA 82-8127. The electronic product (general) annual reporting guide is applicable to the following products: products intended to produce x radiation (accelerators, analytical devices, therapy x-ray machines); microwave diathermy machines; cold-cathode discharge tubes; and vacuum switches and tubes operating at or above 15,000 volts. To carry out its responsibilities under Public Law 90-602, the Food and Drug Administration's Center for Devices and Radiological Health (CDRH) has issued a series of regulations contained in Title 21 of the Code of Federal Regulations (CFR). Part 1002 of 21 CFR deals with records and reports. Section 1002.61 categorizes electronic products into Groups A through C. Section 1002.30 requires manufacturers of products in Groups B and C to establish and maintain certain records, while Section 1002.11 requires such manufacturers to submit an Annual Report summarizing the contents of the required records. Section 1002.7 requires that reports conform to reporting guides issued by CDRH unless an acceptable justification for an alternate format is provided

  1. SU-F-T-29: The Important of Each Fraction Image-Guided Planning for Postoperative HDR-Brachytherapy in Endometrial Carcinoma

    Energy Technology Data Exchange (ETDEWEB)

    Piriyasang, D; Pattaranutaporn, P; Manokhoon, K [Ramathibodi Hospital, Rachatewi, Bangkok (Thailand)

    2016-06-15

    Purpose: Cylindrical applicators are often used for postoperative HDRbrachytherapy in endometrial carcinoma. It has been considered that dosimetric variation between fractions for this treatment is minimal and might not be necessary to perform treatment planning for every fractions. At our institute, it is traditional to perform treatment planning with CT simulation on the first fraction and uses this plan for the rest of treatment. This study was aim to evaluate the errors of critical structure doses between the fractions when simulation and planning were done for first fraction only. Methods: Treatment plans of 10 endometrial carcinoma patients who received postoperative HDR-brachytherapy and underwent CT-simulation for every HDR-fractions at our department were retrospectively reviewed. All of these patients were treated with cylindrical applicator and prescribed dose 15Gy in 3 fractions to 0.5cm from vaginal surface. The treatment plan from the first fraction was used to simulate in second and third CT-simulation. Radiation dose for critical structures in term of Dose-to-2cc (D2cc) were evaluated and compared between planning CT. Results: The D2cc for bladder and rectum were evaluated. For bladder, the mean error of D2cc estimation for second and third fractions was 7.6% (0.1–20.1%, SD=5.7). And the mean error for D2cc of rectum was 8.5% (0.1–29.4%, SD=8.5). Conclusion: The critical structure doses could be significant difference between fractions which may affects treatment outcomes or toxicities. From our data, image-guided brachytherapy at least with CT-Simulation should be done for every treatment fractions.

  2. Family planning education.

    Science.gov (United States)

    Hamburg, M V

    1983-02-01

    17 days were spent devoted to the effort of learning about China's educational approach to family planning in the hope of discovering how they are achieving their remarkable success in reducing population growth. As a member of the 1981 New York University/SIECUS Colloquim in China, it was necessary to rely on the translation provided by the excellent guides. Discussions were focused on questions prepared in advance about the topics that concerned the group. These observations, based on a short and limited exposure, cover the following areas: marriage and family planning policies; the family planning program; school programs; adult education; family planning workers; and unique aspects of the program. China has an official position on marriage and family planning that continues to undergo revisions. The new marriage law sets the minimum ages of marriage at 22 for men and 20 for women. Almost everyone marries, and an unmarried person over age 28 is a rarity. The family planning program in China is carried out by an extensive organizational network at national, provincial, and local government levels. Officials termed it a "propaganda campaign." Hospitals, clinics, and factories invariably displayed posters; a popular set of four presents the advantages of the 1 child family as follows: late marriage is best, for it allows more time to work and study; 1 child is best for the health of the mother; one gets free medical care for his/her child if a family has only 1 child; and there is more time to teach 1 child. The state operated television regularly explains the 1 child policy utilizing special films. According to 1 family planning official, "before marriage there is little sex." There are few abortions for unmarried women. Education about sex is for adults, for those persons who are about to be married. There is little if any sex education in schools. Sexual teaching is not generally acceptable, especially in the rural areas. By contrast, in Shanghai the physiology

  3. Selective Guide to Literature on Engineering Geology. Engineering Literature Guides, Number 7.

    Science.gov (United States)

    Mullen, Cecilia P., Comp.

    This guide has been prepared for use by the undergraduate or graduate student in engineering geology. Because of the broad scope of the field, the major disciplines of soil mechanics, rock mechanics, and foundations are primarily emphasized. This document is a survey of information sources in engineering geology and is intended to identify those…

  4. An image-guided planning system for endosseous oral implants.

    Science.gov (United States)

    Verstreken, K; Van Cleynenbreugel, J; Martens, K; Marchal, G; van Steenberghe, D; Suetens, P

    1998-10-01

    A preoperative planning system for oral implant surgery was developed which takes as input computed tomographies (CT's) of the jaws. Two-dimensional (2-D) reslices of these axial CT slices orthogonal to a curve following the jaw arch are computed and shown together with three-dimensional (3-D) surface rendered models of the bone and computer-aided design (CAD)-like implant models. A technique is developed for scanning and visualizing an eventual existing removable prosthesis together with the bone structures. Evaluation of the planning done with the system shows a difference between 2-D and 3-D planning methods. Validation studies measure the benefits of the 3-D approach by comparing plans made in 2-D mode only with those further adjusted using the full 3-D visualization capabilities of the system. The benefits of a 3-D approach are then evident where a prosthesis is involved in the planning. For the majority of the patients, clinically important adjustments and optimizations to the 2-D plans are made once the 3-D visualization is enabled, effectively resulting in a better plan. The alterations are related to bone quality and quantity (p biomechanics (p < 0.005), and esthetics (p < 0.005), and are so obvious that the 3-D plan stands out clearly (p < 0.005). The improvements often avoid complications such as mandibular nerve damage, sinus perforations, fenestrations, or dehiscences.

  5. Image-guided and adaptive radiotherapy

    International Nuclear Information System (INIS)

    Louvel, G.; Chajon, E.; Henry, O.; Cazoulat, G.; Le Maitre, A.; Simon, A.; Bensadoun, R.J.; Crevoisier, R. de

    2012-01-01

    Image-guided radiotherapy (IGRT) aims to take into account anatomical variations occurring during irradiation by visualization of anatomical structures. It may consist of a rigid registration of the tumour by moving the patient, in case of prostatic irradiation for example. IGRT associated with intensity-modulated radiotherapy (IMRT) is strongly recommended when high-dose is delivered in the prostate, where it seems to reduce rectal and bladder toxicity. In case of significant anatomical deformations, as in head and neck tumours (tumour shrinking and decrease in volume of the salivary glands), re-planning appears to be necessary, corresponding to the adaptive radiotherapy. This should ideally be 'monitored' and possibly triggered based on a calculation of cumulative dose, session after session, compared to the initial planning dose, corresponding to the concept of dose-guided adaptive radiotherapy. The creation of 'planning libraries' based on predictable organ positions (as in cervical cancer) is another way of adaptive radiotherapy. All of these strategies still appear very complex and expensive and therefore require stringent validation before being routinely applied. (authors)

  6. V-TECS Guide for Carpenter.

    Science.gov (United States)

    Moore, Charles G.; And Others

    This curriculum guide provides materials for a nine-duty course in carpentry. The nine duties are estimating materials, preparing building site, sharpening tools, building and installing foundation forms, installing rough framing, installing roof components, installing exterior finishes, installing interior finishes, and assembling and…

  7. Writing of the Medical Physics Organisation Plan (POPM). Guide nr 20 - Version of 2013/04/19

    International Nuclear Information System (INIS)

    Le Du, Dominique; Mazal, Alejandro; Perrin, Benedicte; Sarrade, Catherine; Fau, Pierre; Isambert, Aurelie; Valero, Marc; Rousse, Carole

    2013-01-01

    The medical physicist (also called expert in medical physics) mentioned in this guide belongs to the field of experts in medical radio-physics as they are defined in the French Health Code, and who intervene in radiotherapy, nuclear medicine (diagnosis and therapy), radiology and in radiation protection. After a more precise definition of these professions, this document aims at providing guidelines for the elaboration and assessment of a medical physics organisation plan (POPM) while taking recommendations made by the MeaH (the French national mission of hospital expertise and audit) and IRSN into account. More precisely, it describes how to write such a plan for establishments using ionizing radiations for medical purposes. It first formulates methodological recommendations for the development of the POPM, and then describes the content of this POPM: elements to be present, role of nuclear physics in the establishment general organisation, establishment activities related to the use of ionizing radiations, fields of nuclear physics, presentation of equipment involved in the implementation of radiological activities, medical physics organisation and personnel, medical physics tasks performed by non medical physicist personnel, and new projected techniques and practice. The last part addresses the update, assessment and reviewing of a POPM

  8. A cone beam CT-guided online plan modification technique to correct interfractional anatomic changes for prostate cancer IMRT treatment

    International Nuclear Information System (INIS)

    Fu Weihua; Yang Yong; Yue, Ning J; Heron, Dwight E; Huq, M Saiful

    2009-01-01

    The purpose of this work is to develop an online plan modification technique to compensate for the interfractional anatomic changes for prostate cancer intensity-modulated radiation therapy (IMRT) treatment based on daily cone beam CT (CBCT) images. In this proposed technique, pre-treatment CBCT images are acquired after the patient is set up on the treatment couch using an in-room laser with the guidance of the setup skin marks. Instead of moving the couch to rigidly align the target or re-planning using the CBCT images, we modify the original IMRT plan to account for the interfractional target motion and deformation based on the daily CBCT image feedback. The multileaf collimator (MLC) leaf positions for each subfield are automatically adjusted in the proposed algorithm based on the position and shape changes of target projection in the beam's eye view (BEV). Three typical prostate cases were adopted to evaluate the proposed technique, and the results were compared with those obtained with bony-structure-based rigid translation correction, prostate-based correction and CBCT-based re-planning strategies. The study revealed that the proposed modification technique is superior to the bony-structure-based and prostate-based correction techniques, especially when interfractional target deformation exists. Its dosimetric performance is closer to that of the re-planned strategy, but with much higher efficiency, indicating that the introduced online CBCT-guided plan modification technique may be an efficient and practical method to compensate for the interfractional target position and shape changes for prostate IMRT.

  9. VCA-DVC VMware certified associate on vSphere study guide VCAD-510

    CERN Document Server

    Schmidt, Robert

    2015-01-01

    Use this expert guide to prepare for the VCA-DCV exam VCA-DCV VMware Certified Associate on vSphere Study Guide: VCAD-510 is a comprehensive study guide for the VMware Certified Associate - Data Center Virtualization exam. Hands-on examples, real-world scenarios, and expert review questions cover the full exam blueprint, and the companion website offers a suite of tools to help you prepare for the exam including practice exams, electronic flashcards, and a glossary of key terms. In addition, the website includes videos that demonstrate how to complete the more challenging tasks. Focused on p

  10. Methodological guide: management of industrial sites potentially contaminated by radioactive substances; Guide methodologique: gestion des sites industriels potentiellement contamines par des substances radioactives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    At the request of the Ministries of Health and the Environment, IPSN is preparing and publishing the first version of the methodological guide devoted to managing industrial sites potentially contaminated by radioactive substances. This guide describes a procedure for defining and choosing strategies for rehabilitating such industrial sites. (author)

  11. Tailor-made Surgical Guide Reduces Incidence of Outliers of Cup Placement.

    Science.gov (United States)

    Hananouchi, Takehito; Saito, Masanobu; Koyama, Tsuyoshi; Sugano, Nobuhiko; Yoshikawa, Hideki

    2010-04-01

    Malalignment of the cup in total hip arthroplasty (THA) increases the risks of postoperative complications such as neck cup impingement, dislocation, and wear. We asked whether a tailor-made surgical guide based on CT images would reduce the incidence of outliers beyond 10 degrees from preoperatively planned alignment of the cup compared with those without the surgical guide. We prospectively followed 38 patients (38 hips, Group 1) having primary THA with the conventional technique and 31 patients (31 hips, Group 2) using the surgical guide. We designed the guide for Group 2 based on CT images and fixed it to the acetabular edge with a Kirschner wire to indicate the planned cup direction. Postoperative CT images showed the guide reduced the number of outliers compared with the conventional method (Group 1, 23.7%; Group 2, 0%). The surgical guide provided more reliable cup insertion compared with conventional techniques. Level II, therapeutic study. See the Guidelines for Authors for a complete description of levels of evidence.

  12. What to include in your birth plan

    Science.gov (United States)

    Pregnancy - birth plan ... Birth plans are guides that parents-to-be make to help their health care providers best support them during ... things to consider before you make a birth plan. This is a great time to learn about ...

  13. Basic Gasoline Engine Mechanics. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a basic gasoline engine mechanics program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…

  14. Marketing and Distributive Education. Food Marketing Curriculum Guide

    Science.gov (United States)

    Northern Illinois Univ., DeKalb. Dept. of Business Education and Administration Services.

    This document is one of four curriculum guides designed to provide the curriculum coordinator with a basis for planning a comprehensive program in the field of marketing as well as to provide marketing and distributive education teachers with maximum flexibility. Introductory information provides directions for using the guide and information on…

  15. Household Arts: A Curriculum Guide. Professional Series 3.

    Science.gov (United States)

    Markle, Roena J.

    Presented is a curriculum guide on household arts developed as part of the Adjustment Training Program of the Greater Pittsburgh Guild for the Blind. Objectives and learning experiences are described for the following seven units: orientation in the kitchen, basic food preparation, advanced food preparation, laundry, housekeeping, basic sewing,…

  16. Hurricane Sandy science plan: impacts to coastal ecosystems, habitats, and fish and wildlife

    Science.gov (United States)

    Campbell, Warren H.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: • Coastal topography and bathymetry

  17. Long-term research plan for human factors affecting safeguards at nuclear power plants. Volume 1. Summary and users' guide. Vol. 1

    International Nuclear Information System (INIS)

    O'Brien, J.N.; Fainberg, A.

    1984-04-01

    This report presents a long-term research plan for addressing human factors which can adversely affect safeguards at nuclear power plants. It was developed in order to prioritize and propose research for NRC in regulating power plant safeguards. Research efforts addressing human factors in safeguards were developed and prioritized according to the importance of human factors areas. Research was also grouped to take advantage of common research approaches and data sources where appropriate. Four main program elements emerged from the analysis, namely (1) Training and Performance Evaluation, (2) Organizational Factors, (3) Man-Machine Interface, and (4) Trustworthiness and Reliability. Within each program element, projects are proposed with results and information flowing between program elements where useful. An overall research plan was developed for a 4-year period and it would lead ultimately to regulatory activities including rulemaking, regulatory guides, and technical bases for regulatory action. The entire plan is summarized in Volume 1 of this report

  18. South Carolina School Facilities Planning and Construction Guide.

    Science.gov (United States)

    South Carolina State Dept. of Education, Columbia. Office of School Planning and Building.

    This publication, the result of a review of state school construction regulations, was developed for the purpose of providing an up-to-date guide on current laws, regulations, and the technology of the building profession. It is intended for architects and engineers as well as for school superintendents and boards of trustees, all of whom are…

  19. Changing Minds: A Guide to Facilitated Participatory Planning ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2011-10-01

    Oct 1, 2011 ... This book draws on the work of thinkers and doers throughout the world who have grappled with the challenge of planning complex institutions, especially health systems and development projects. Their problem: Conventional planning methods often do not work. The solution: Involve all the key ...

  20. Guidance for preparing user requirements documents for small and medium reactors and their application

    International Nuclear Information System (INIS)

    2000-08-01

    During the past decade, several countries with highly developed nuclear power programs established user required documents (URDs) to guide the development and implementation of advanced light water reactors. These efforts built upon the extensive experience with operating reactors and included new insights from ongoing research and development to enhance the economic performance and safety of future nuclear power plants. Subsequently, a number of developing countries with plans for introducing nuclear energy into their national programs expressed strong interest in establishing analogous requirements. The IAEA has therefore taken the initiative to assist in the elaboration of such requirements. Building upon relevant documents this report recommends a URD structure and content outline to support developing countries in preparing their URDs for various applications of small and medium reactors (e.g. electricity generation and/or desalination). This report was prepared by representatives from both developing and developed Member States