WorldWideScience

Sample records for plan includes sections

  1. 10 CFR 719.10 - What information must be included in the legal management plan?

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  2. 25 CFR 170.411 - What may a long-range transportation plan include?

    Science.gov (United States)

    2010-04-01

    ...) Social and economic development planning to identify transportation improvements or needs to accommodate... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN...

  3. 12 CFR 516.20 - What information must I include in my draft business plan?

    Science.gov (United States)

    2010-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  4. 40 CFR 52.465 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.465 Original identification of plan section. (a) This section identifies the original “Air Implementation Plan for the State...

  5. 40 CFR 52.69 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.69 Original identification of plan section. (a) This section identifies the original “Air Implementation Plan for the State...

  6. 40 CFR 52.939 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.939 Original identification of plan section. (a) This section identifies the original “Air Implementation Plan for the...

  7. 40 CFR 52.677 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.677 Original identification of plan section. (a) This section identifies the original “Idaho Air Quality Implementation Plan...

  8. 40 CFR 52.824 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.824 Original identification of plan section. (a) This section identifies the original “Air Implementation Plan for the State...

  9. 40 CFR 52.2635 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan... implementation plan (SIP) for Sheridan, Wyoming. In addition to the original August 28 submittal, eight...

  10. 40 CFR 52.875 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.875 Original identification of plan section. (a) This section identifies the original “Air Quality Implementation Plan for the...

  11. 40 CFR 52.590 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia> § 52.590 Original identification of plan section. (a) This section identifies the original “Air Implementation Plan for the State...

  12. 40 CFR 52.200 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arkansas § 52.200 Original identification of plan section. (a) This section identifies the original “Arkansas Plan for Implementation for...

  13. 40 CFR 52.2465 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.2465 Section 52.2465 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  14. 40 CFR 52.2186 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.2186 Section 52.2186 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  15. 40 CFR 52.1100 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1100 Section 52.1100 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  16. 40 CFR 52.1281 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1281 Section 52.1281 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  17. 40 CFR 52.1535 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1535 Section 52.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  18. 40 CFR 52.1783 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1783 Section 52.1783 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  19. 40 CFR 52.2087 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan.... (B) Original consent agreement between the Rhode Island Department of Environmental Management and...

  20. 40 CFR 52.536 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.536 Original identification of plan section. (a) This section identifies the original “State of Florida Air Implementation...

  1. 40 CFR 52.2134 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “South Carolina Air... Charleston; for these two sources, the plan's original emission limits continue to apply.) (10) Permit...

  2. 40 CFR 52.999 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Louisiana § 52.999 Original identification of plan section. (a) This section identifies the original “The Louisiana Air Control Commission...

  3. 40 CFR 52.2386 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan... from the original approval of Regulation 5-231(3)(b) into the Vermont SIP identified at subparagraph (c...

  4. 40 CFR 52.1837 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...) Explanation of why sources could not comply by the original attainment date submitted April 23, 1975, by the...

  5. 40 CFR 52.1037 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... identification of plan section. (a) This section identifies the original “Air Implementation Plan for the State...), and conditions 12(A), 12(C), (13), (14) and (15) for Tree Free Fiber Company, LLC, (formerly Statler...

  6. 40 CFR 52.1190 - Original Identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original Identification of plan section... Original Identification of plan section. (a) This section identifies the original “Air Implementation Plan... Stipulation for Entry of Consent Order and Final Order, No. 8-1982. The original Consent Order No. 8-1982 was...

  7. 40 CFR 52.1426 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1426 Section 52.1426 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Nebraska Air Quality...

  8. 40 CFR 52.2239 - Original Identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original Identification of plan section. 52.2239 Section 52.2239 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original Identification of plan section. (a) This section identifies the original “Tennessee Air Pollution...

  9. 40 CFR 52.1640 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1640 Section 52.1640 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “State of New Mexico...

  10. 40 CFR 52.1960 - Original Identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original Identification of plan section... Original Identification of plan section. (a) This section identifies the original “State of Oklahoma Air... § 856.1(C) of the Oklahoma statutes to mean “original equipment manufacturer (OEM) or equivalent”. (40...

  11. 42 CFR 417.155 - How the HMO option must be included in the health benefits plan.

    Science.gov (United States)

    2010-10-01

    ... printed materials that meet the requirements of § 417.124(b). (ii) Access may not be more restrictive or... benefits plan. 417.155 Section 417.155 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT... Organizations in Employee Health Benefits Plans § 417.155 How the HMO option must be included in the health...

  12. PLANNING VESSEL BODY SECTION PRODUCTION

    Directory of Open Access Journals (Sweden)

    A. G. Grivachevsky

    2015-01-01

    Full Text Available A problem of planning production of a vessel body section is considered. The problem is reduced to the classic Johnson’s tree-machine flow-shop scheduling problem. A genetic algorithm and computer experiment to compare efficiency of this algorithm and the algorithm of full enumeration are described.

  13. 34 CFR 364.42 - What objectives and information must be included in the State plan?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What objectives and information must be included in the State plan? 364.42 Section 364.42 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE...

  14. Diabetes Nutrition: Including Sweets in Your Meal Plan

    Science.gov (United States)

    Diabetes nutrition: Including sweets in your meal plan Diabetes nutrition focuses on healthy foods, but sweets aren't necessarily ... your meal plan. By Mayo Clinic Staff Diabetes nutrition focuses on healthy foods. But you can eat ...

  15. NRC program for the resolution of generic issues related to nuclear power plants. (Includes plans for the resolution of ''unresolved safety issues'' pursuant to Section 210 of the Energy Reorganization Act of 1974, as amended)

    International Nuclear Information System (INIS)

    1977-12-01

    This report provides a description of the Nuclear Regulatory Commission's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. The NRC program is of considerably broader scope than the ''Unresolved Safety Issues Plan'' required by Section 210. The NRC program does include plans for the resolution of ''Unresolved Safety Issues''; however, in addition, it includes generic tasks for the resolution of environmental issues, for the development of improvements in the reactor licensing process and for consideration of less conservative design criteria or operating limitations in areas where over conservatisms may be unnecessarily restrictive or costly

  16. Cabinet decision creating a family planning section in the Ministry of Manpower.

    Science.gov (United States)

    1989-01-01

    As of April 1, 1989 the Indonesian Ministry of Manpower will contain a family planning section within its regular structure. It will be part of a newly created Sub-directorate for Workers Welfare, which also contains sections for health facilities/services and for nutrition and other welfare services. The family planning section is to be staffed by 8 full-time officials who are responsible for population, family welfare, and family planning programs in the Ministry of Manpower.

  17. A plan for research by the atmospheric research section in support of Ontario Hydro's nuclear activities

    International Nuclear Information System (INIS)

    Ogram, G.L.; Melo, O.T.

    1984-01-01

    A plan for nuclear studies by the Atmospheric Research Section is presented. The need for research is discussed and research objectives are established. Recommended research activities include the study of fundamental processes governing the fate of emissions released to the atmosphere by Hydro's nuclear facilities and the development of improved transport models describing the fate of these emissions. A Sectional goal of providing technical expertise in the atmospheric sciences in support of Ontario Hydro's present and future nuclear activities is proposed. The plan covers a five-year time frame (1984-1988)

  18. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  19. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    International Nuclear Information System (INIS)

    Jannik, G.T.

    1994-01-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan's purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements

  20. 30 CFR 250.110 - What must I include in my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I include in my welding plan? 250.110... must I include in my welding plan? You must include all of the following in the Welding Plan that you... qualified personnel weld; (c) Practices and procedures for safe welding that address: (1) Welding in...

  1. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  2. Advanced methodology for generation expansion planning including interconnected systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, M; Yokoyama, R; Yasuda, K [Tokyo Metropolitan Univ. (Japan); Sasaki, H [Hiroshima Univ. (Japan); Ogimoto, K [Electric Power Development Co. Ltd., Tokyo (Japan)

    1994-12-31

    This paper reviews advanced methodology for generation expansion planning including interconnected systems developed in Japan, putting focus on flexibility and efficiency in a practical application. First, criteria for evaluating flexibility of generation planning considering uncertainties are introduced. Secondly, the flexible generation mix problem is formulated as a multi-objective optimization with more than two objective functions. The multi-objective optimization problem is then transformed into a single objective problem by using the weighting method, to obtain the Pareto optimal solution, and solved by a dynamics programming technique. Thirdly, a new approach for electric generation expansion planning of interconnected systems is presented, based on the Benders Decomposition technique. That is, large scale generation problem constituted by the general economic load dispatch problem, and several sub problems which are composed of smaller scale isolated system generation expansion plans. Finally, the generation expansion plan solved by an artificial neural network is presented. In conclusion, the advantages and disadvantages of this method from the viewpoint of flexibility and applicability to practical generation expansion planning are presented. (author) 29 refs., 10 figs., 4 tabs.

  3. 40 CFR 60.3012 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ..., 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements.... The plan must identify any additional waste management measures and implement those measures the...

  4. 40 CFR 62.14590 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or... use of recyclable materials. The plan must identify any additional waste management measures, and the...

  5. 40 CFR 60.2630 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation... of recyclable materials. The plan must identify any additional waste management measures, and the...

  6. 40 CFR 60.2901 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Analysis Waste Management Plan § 60.2901 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements such as... must identify any additional waste management measures and implement those measures the source...

  7. A pre-feasibility case study on integrated resource planning including renewables

    International Nuclear Information System (INIS)

    Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.

    2008-01-01

    In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables

  8. 12 CFR 563b.105 - What information must I include in my business plan?

    Science.gov (United States)

    2010-01-01

    ... information must I include in my business plan? (a) Prior to filing an application for conversion, you must adopt a business plan reflecting your intended plans for deployment of the proposed conversion proceeds. Your business plan is required, under § 563b.150, to be included in your conversion application. At a...

  9. What to include in your birth plan

    Science.gov (United States)

    Pregnancy - birth plan ... Birth plans are guides that parents-to-be make to help their health care providers best support them during ... things to consider before you make a birth plan. This is a great time to learn about ...

  10. 75 FR 68383 - Hearing on Reasonable Contracts or Arrangements for Welfare Benefit Plans Under Section 408(b)(2...

    Science.gov (United States)

    2010-11-05

    ... Arrangements for Welfare Benefit Plans Under Section 408(b)(2)--Welfare Plan Fee Disclosure AGENCY: Employee... health, disability, severance and other employee welfare benefit plans under section 408(b)(2) of the... affect employee welfare benefit plans. At least one commenter addressed specific concerns of pharmacy...

  11. 40 CFR 60.2065 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Management Plan § 60.2065 What should I include in my waste management plan? A waste management plan must... additional waste management measures and implement those measures the source considers practical and feasible, considering the effectiveness of waste management measures already in place, the costs of additional measures...

  12. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    Science.gov (United States)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  13. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Science.gov (United States)

    2010-05-26

    ...; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093560837). The Office of Nuclear Security...

  14. Relating DSM-5 section II and section III personality disorder diagnostic classification systems to treatment planning.

    Science.gov (United States)

    Morey, Leslie C; Benson, Kathryn T

    2016-07-01

    Beginning with DSM-III, the inclusion of a "personality" axis was designed to encourage awareness of personality disorders and the treatment-related implications of individual differences, but since that time there is little accumulated evidence that the personality disorder categories provide substantial treatment-related guidance. The DSM-5 Personality and Personality Disorders Work Group sought to develop an Alternative Model for personality disorder, and this study examined whether this model is more closely related to clinicians' decision-making processes than the traditional categorical personality disorder diagnoses. A national sample of 337 clinicians provided complete personality disorder diagnostic information and several treatment-related clinical judgments about one of their patients. The dimensional concepts of the DSM-5 Alternative Model for personality disorders demonstrated stronger relationships than categorical DSM-IV/DSM-5 Section II diagnoses to 10 of 11 clinical judgments regarding differential treatment planning, optimal treatment intensity, and long-term prognosis. The constructs of the DSM-5 Alternative Model for personality disorders may provide more clinically useful information for treatment planning than the official categorical personality disorder diagnostic system retained in DSM-5 Section II. Copyright © 2016 Elsevier Inc. All rights reserved.

  15. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  16. 26 CFR 1.72-15 - Applicability of section 72 to accident or health plans.

    Science.gov (United States)

    2010-04-01

    ... retirement and the payment of an earlier pension in the event of permanent disability. This section will also... presumed that the disability pension is provided by employer contributions, unless the plan expressly... or inclusion of accident or health benefits under sections 104 and 105. For example, the investment...

  17. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  18. METHODOLOGY OF DETERMINATION OF ADMISSIBLE SPEEDS OF TRAIN MOVEMENT ON DIFFICULT SECTIONS OF RAILROAD PLAN

    Directory of Open Access Journals (Sweden)

    M. B. Kurhan

    2014-03-01

    Full Text Available Purpose. Determination of improvement ways of admissible speeds of train movement on the difficult sections of а railroad plan. Methodology. Mathematical modeling of the train traffic is used to achieve the purpose of research. The average weighted speed and elevation of outer rail is predicted on this basis. Findings. The case analysis of the speeds determination in curved sections of track was carried out. The above mentioned track sections adversely affect the ride comfort and the intensity of the way disorder, as well as the reasons that contribute to the speed limits traffic on the railways of Ukraine. The technique of performing the calculations for determining the permissible train speeds was developed and tested on real curves of railways, were the accelerated movement of trains was introduced. Proposals on automate calculations in distances and services by way of determining the permissible speeds in curves were developed. Originality. Methodology of determining the permissible motion speeds and elevation of outer rails on the difficult sections of the railway plan was developed. This approach allows you to get a rational decisions on reorganization of plan based on local conditions. Practical value. The developed technique of definition of admissible speeds of motion in curves was implemented as a program DopShvid. The program was tested on real railway sections, where the accelerated train motion was introduced.

  19. 2009 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    Energy Technology Data Exchange (ETDEWEB)

    Environmental Stewardship Group (ENV-ES)

    2010-11-01

    For reporting year 2009, Los Alamos National Laboratory (LANL) submitted a Form R report for lead as required under the Emergency Planning and Community Right-to- Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2009 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2009, as well as to provide background information about data included on the Form R reports.

  20. 77 FR 12086 - Final Staff Guidance, Revision 4 to Standard Review Plan; Section 8.1 on Electric Power-Introduction

    Science.gov (United States)

    2012-02-28

    ... Plan; Section 8.1 on Electric Power--Introduction AGENCY: Nuclear Regulatory Commission. [[Page 12087... Nuclear Power Plants,'' Standard Review Plan (SRP) Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113640121), and the Branch...

  1. 10 CFR 1021.200 - DOE planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false DOE planning. 1021.200 Section 1021.200 Energy DEPARTMENT... Decisionmaking § 1021.200 DOE planning. (a) DOE shall provide for adequate and timely NEPA review of DOE... accordance with 40 CFR 1501.2 and this section. In its planning for each proposal, DOE shall include adequate...

  2. 76 FR 23630 - Office of New Reactors; Proposed Revision 2 to Standard Review Plan, Section 1.0 on Introduction...

    Science.gov (United States)

    2011-04-27

    ... Standard Review Plan, Section 1.0 on Introduction and Interfaces AGENCY: Nuclear Regulatory Commission (NRC... Revision 2 to Standard Review Plan (SRP), Section 1.0, ``Introduction and Interfaces'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110110573). The Office of New Reactors (NRO...

  3. Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy

    Energy Technology Data Exchange (ETDEWEB)

    Ding, Yi; Kang, Chongqing; Wang, Jianhui; Chen, Yihsu; Hobbs, Benjamin F.

    2015-03-01

    The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.

  4. 76 FR 31381 - Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

    Science.gov (United States)

    2011-05-31

    ... Standard Review Plan; Section 8.1 on Electric Power--Introduction AGENCY: U.S. Nuclear Regulatory...,'' on a proposed Revision 4 to Standard Review Plan (SRP), Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111180542). The previous version of...

  5. 26 CFR 1.404(a)-4 - Pension and annuity plans; limitations under section 404(a)(1)(A).

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Pension and annuity plans; limitations under... OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Pension, Profit-Sharing, Stock Bonus Plans, Etc. § 1.404(a)-4 Pension and annuity plans; limitations under section 404(a)(1)(A). (a) Subject...

  6. 26 CFR 1.404(a)-5 - Pension and annuity plans; limitations under section 404(a)(1)(B).

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Pension and annuity plans; limitations under... OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Pension, Profit-Sharing, Stock Bonus Plans, Etc. § 1.404(a)-5 Pension and annuity plans; limitations under section 404(a)(1)(B). (a) Subject...

  7. 26 CFR 1.404(a)-6 - Pension and annuity plans; limitations under section 404(a)(1)(C).

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Pension and annuity plans; limitations under... OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Pension, Profit-Sharing, Stock Bonus Plans, Etc. § 1.404(a)-6 Pension and annuity plans; limitations under section 404(a)(1)(C). (a...

  8. Influence of Lay Plan Solution in Fabric Efficiency and Consume in Cutting Section

    OpenAIRE

    Dumishllari Elmira; Guxho Genti

    2016-01-01

    One cutting order may require several lies and markers to achieve optimal efficiency and selection of right Lay Plan is one of the major challenges in cutting section, in a way to lead in fabric economy and reduced costs. The main purpose of this paper is to determine the best solution of lay plan and its influence, in the cutting room, starting from the analysis of the lay indicators calculations. We have studied an order with 200 jackets, with specific sizes. Markers are made by Gemini CAD ...

  9. 41 CFR 301-74.4 - What should cost comparisons include?

    Science.gov (United States)

    2010-07-01

    ... comparisons include? 301-74.4 Section 301-74.4 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 74-CONFERENCE PLANNING Agency Responsibilities § 301-74.4 What should cost comparisons include? Cost comparisons should include...

  10. 29 CFR 2580.412-2 - Plans exempt from the coverage of section 13.

    Science.gov (United States)

    2010-07-01

    ... whole or in part, of dealing with employers concerning an employee welfare or pension benefit plan, or... Section 2580.412-2 Labor Regulations Relating to Labor (Continued) EMPLOYEE BENEFITS SECURITY ADMINISTRATION, DEPARTMENT OF LABOR TEMPORARY BONDING RULES UNDER THE EMPLOYEE RETIREMENT INCOME SECURITY ACT OF...

  11. 1992 Toxic Chemical Release Inventory: Emergency Planning and Community Right-To-Know-Act of 1986 Section 313

    International Nuclear Information System (INIS)

    1993-07-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act of 1986 (EPCRA) requires the annual submittal of toxic chemical release information to the US Environmental Protection Agency (EPA). The following document is the July 1993 submittal of the EPCRA Toxic Chemical Release Inventory Report (Form R). Included is a Form R for chlorine and for lead, the two chemicals used in excess of the established regulatory thresholds at the Hanford Site by the US Department of Energy, Richland Operations Office and its contractors during calendar year 1992

  12. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  13. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... appropriate, a management plan that includes a proposed multiyear workplan. (b) At a minimum, this workplan...

  14. 40 CFR 74.61 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  15. 7 CFR 25.202 - Strategic plan.

    Science.gov (United States)

    2010-01-01

    ... contributed to the planning process; (3) Identify the amount of State, local, and private resources that will... 7 Agriculture 1 2010-01-01 2010-01-01 false Strategic plan. 25.202 Section 25.202 Agriculture... Procedure § 25.202 Strategic plan. (a) Principles of strategic plan. The strategic plan included in the...

  16. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  17. Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.

    Science.gov (United States)

    Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao

    2018-03-01

    To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.

  18. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  19. 75 FR 6413 - Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical...

    Science.gov (United States)

    2010-02-09

    ... Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and.... SUMMARY: The NRC is soliciting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' on a proposed Revision 1 to Standard Review Plan (SRP...

  20. Emergency Planning and Community Right-To-Know Act, Section 311

    International Nuclear Information System (INIS)

    Evans, R.A.; Martin, K.J.

    1996-03-01

    The following information reflects changes in the lists of hazardous chemicals present at this facility in amounts equal to or greater than 10,000 pounds and extremely hazardous substances present in amounts equal to or greater than 500 pounds or its Threshold Planning Quantity, whichever was lowest. These lists represent the following: list of materials last reported in February 1995; materials to be deleted from list; materials to be added to list; and revised list of materials. The revised list of materials is a composite of the Y-12 Plant Emergency Planing and Community Right-to-Know Act Section 312 report prepared and submitted for calendar year 1995

  1. Province of Ontario nuclear emergency plan. Pt. 1

    International Nuclear Information System (INIS)

    1986-06-01

    The Province of Ontario Nuclear Emergency Plan has been developed pursuant to Section 8 of the Emergency Plans Act, 1983. This plan replaces the Province of Ontario Nuclear Contingency Off-Site Plan (June 1980) which is no longer applicable. The wastes plan includes planning, preparation, emergency organization and operational responsibilities and policy

  2. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  3. 1995 Toxic chemical release inventory: Emergency Planning and Community Right-to-Know Act of 1986, Section 313

    International Nuclear Information System (INIS)

    Mincey, S.L.

    1996-08-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act (EPCRA) requires the annual submittal of toxic chemical release information to the U.S. Environmental Protection Agency.Executive Order 12856, 'Federal Compliance With Right-to-Know Laws and Pollution Prevention Requirements' extends the requirements of EPCRA to all Federal agencies. The following document is the August 1996 submittal of the Hanford Site Toxic Chemical Release Inventory report. Included is a Form R for ethylene glycol, the sole chemical used in excess of the established regulatory thresholds at the Hanford Site by the U.S. Department of Energy, Richland Operations Office and its contractors during Calendar Year 1995

  4. 29 CFR 42.8 - Coordination plan.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Coordination plan. 42.8 Section 42.8 Labor Office of the Secretary of Labor COORDINATED ENFORCEMENT § 42.8 Coordination plan. (a) Based upon, among other things, the... coordination plan concerning farm labor-related responsibilities of the Department, including migrant housing...

  5. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  6. A Collaborative Approach to Transportation Planning: Federal and State Perspectives on Section 180(c) Program Development

    International Nuclear Information System (INIS)

    Macaluso, C.; Strong, T.; Janairo, L.; Helvey, E.

    2006-01-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) committed in its November 2003 Strategic Plan for the Safe Transportation of Spent Nuclear Fuel and High-Level Radioactive Waste to Yucca Mountain: A Guide to Stakeholder Interactions to develop the transportation system collaboratively with stakeholders. The Strategic Plan further stated that four state regional groups (SRGs) would be the 'anchors' for OCRWM's collaboration with the states. The first major transportation planning activity that OCRWM initiated after publication of the Strategic Plan was the development of the Section 180(c) grant program. This document describes that collaboration and its outcomes from the perspective of the OCRWM participants and one of the SRGs, the Council of State Governments - Midwestern Office (CSG Midwest). (authors)

  7. 41 CFR 102-37.150 - What must a State legislature include in the plan?

    Science.gov (United States)

    2010-07-01

    ... set forth in Appendix B of this part. It may also include in the plan other provisions not inconsistent with the purposes of title 40 of the United States Code and the requirements of this part. [67 FR...

  8. Nuclear reactor built, being built, or planned

    International Nuclear Information System (INIS)

    1991-06-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1990. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE, from the US Nuclear Regulatory Commission, from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations, from US and foreign embassies, and from foreign governmental nuclear departments. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly

  9. Bridge removal plan requirements.

    Science.gov (United States)

    2011-04-15

    This report provides resources that detail specifications and guidelines related to bridge removal plans across the : United States. We have organized the information into three sections: : ! National Guidance : Includes language from AASHTO specific...

  10. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  11. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  12. Nuclear reactors built, being built, or planned, 1988

    International Nuclear Information System (INIS)

    1989-08-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1988. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington Headquarters and field offices of DOE, from the US Nuclear Regulatory Commission, from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations, from US and foreign embassies, and from foreign governmental nuclear departments. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables. Section 2 includes nuclear reactors that are operating, being built, or planned. Section 3 includes reactors that have been shut down permanently or dismantled

  13. Microscopic description of production cross sections including deexcitation effects

    Science.gov (United States)

    Sekizawa, Kazuyuki

    2017-07-01

    Background: At the forefront of the nuclear science, production of new neutron-rich isotopes is continuously pursued at accelerator laboratories all over the world. To explore the currently unknown territories in the nuclear chart far away from the stability, reliable theoretical predictions are inevitable. Purpose: To provide a reliable prediction of production cross sections taking into account secondary deexcitation processes, both particle evaporation and fission, a new method called TDHF+GEMINI is proposed, which combines the microscopic time-dependent Hartree-Fock (TDHF) theory with a sophisticated statistical compound-nucleus deexcitation model, GEMINI++. Methods: Low-energy heavy ion reactions are described based on three-dimensional Skyrme-TDHF calculations. Using the particle-number projection method, production probabilities, total angular momenta, and excitation energies of primary reaction products are extracted from the TDHF wave function after collision. Production cross sections for secondary reaction products are evaluated employing GEMINI++. Results are compared with available experimental data and widely used grazing calculations. Results: The method is applied to describe cross sections for multinucleon transfer processes in 40Ca+124Sn (Ec .m .≃128.54 MeV ), 48Ca+124Sn (Ec .m .≃125.44 MeV ), 40Ca+208Pb (Ec .m .≃208.84 MeV ), 58Ni+208Pb (Ec .m .≃256.79 MeV ), 64Ni+238U (Ec .m .≃307.35 MeV ), and 136Xe+198Pt (Ec .m .≃644.98 MeV ) reactions at energies close to the Coulomb barrier. It is shown that the inclusion of secondary deexcitation processes, which are dominated by neutron evaporation in the present systems, substantially improves agreement with the experimental data. The magnitude of the evaporation effects is very similar to the one observed in grazing calculations. TDHF+GEMINI provides better description of the absolute value of the cross sections for channels involving transfer of more than one proton, compared to the grazing

  14. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... statement including identification of high priority knowledge, skill, and organization needs for rural..., which in turn support State development strategies. (3) A concise statement of the organization structure for planning and conducting the program funded under section 503(b)(2). (4) A plan for evaluating...

  15. Levels, trends and reasons for unmet need for family planning among married women in Botswana: a cross-sectional study.

    Science.gov (United States)

    Letamo, Gobopamang; Navaneetham, Kannan

    2015-03-31

    The objectives of this study are: (1) to estimate the prevalence of unmet need for family planning among married women using Botswana Family Health Survey 2007 data and (2) to identify risk factors for unmet need for family planning among married women. This study used secondary data from a cross-sectional survey that was conducted to provide a snapshot of health issues in Botswana. Nationally representative population survey data. 2601 married or in union women aged 15-49 years who participated in the 2007 Botswana Family Health Survey were included in the analysis. Unmet need for family planning, which was defined as the percentage of all fecund married women who are not using a method of contraception even though they do not want to get pregnant. Married women who had unmet need for family planning were 9.6% in 2007. Most of the unmet need was for limiting (6.7%) compared to spacing (2.9%). Unmet need for family planning was more likely to be among women whose partners disapproved of family planning, non-Christians, had one partner and had never discussed family planning with their partner. Women of low parity, aged 25-34 years, and greater exposure to mass media, were less likely to have experienced unmet need. The patterns and magnitude of covariates differed between unmet need for limiting and for spacing. The prevalence of unmet need for family planning was low in Botswana compared to other sub-Saharan African countries. The findings from this study reemphasise the importance of women's empowerment and men's involvement in women's sexual and reproductive healthcare needs and services. Different approaches are needed to satisfy the demand for family planning for spacing and limiting. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  16. 30 CFR 285.610 - What must I include in my SAP?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I include in my SAP? 285.610 Section... Requirements Contents of the Site Assessment Plan § 285.610 What must I include in my SAP? Your SAP must... SAP, you must provide the following information: ER29AP09.115 (b) You must provide the results of...

  17. 75 FR 36126 - Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on...

    Science.gov (United States)

    2010-06-24

    ... Standard Review Plan Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating...), Section 13.6.1 on ``Physical Security--Combined License and Operating Reactors,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100350158). The Office of Nuclear Security and...

  18. Fusion reactor materials program plan. Section III. Plasma material interaction

    International Nuclear Information System (INIS)

    1978-07-01

    A discussion of materials-related problems and an analysis of such problems is given for each major topical area. The strategy that will be used to solve the materials problems is described. As part of this program strategy, a series of major milestones is identified that extends over the next 20 years. Detailed task descriptions for the next five years leading to the achievement of the major milestones are given. Each task is described on a separate page (or task sheet) which includes the task number, task title, objective, scope, and the major milestones addressed by the task. Secondary milestones within a given task or subtask are defined, together with a priority assignment and an estimate of man-years to accomplish the work. Each Plan is organized along major topics which parallel the Subtask organization of the Task Group responsible for the Plan

  19. 13 CFR 108.320 - Contents of comprehensive business plan.

    Science.gov (United States)

    2010-01-01

    ... plan. 108.320 Section 108.320 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS... Contents of comprehensive business plan. (a) Executive summary. The executive summary must include a... or entity, or any other firm or entity essential to the success of the Applicant's business plan. [66...

  20. Nuclear reactors built, being built, or planned, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, B.

    1992-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).

  1. Nuclear reactors built, being built, or planned, 1991

    International Nuclear Information System (INIS)

    Simpson, B.

    1992-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5)

  2. Deferred Compensation for Personnel of Tax-Exempt Universities: Effective Use of Section 403(b) Plans.

    Science.gov (United States)

    Crain, John L.; And Others

    1989-01-01

    Under the Tax Reform Act of 1986 many university employees are no longer able to make tax deductible contributions to an IRA. Several alternative plans of action are discussed including tax-deferred annuities. Tax planning strategies are offered. (MLW)

  3. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  4. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  5. 24 CFR 882.123 - Conversion of Section 23 Units to Section 8 and Section 23 monitoring.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Conversion of Section 23 Units to... Applicability, Scope and Basic Policies § 882.123 Conversion of Section 23 Units to Section 8 and Section 23 monitoring. (a)-(d) [Reserved] (e) Section 23 policies for units planned for conversion on or before...

  6. 2004 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    Energy Technology Data Exchange (ETDEWEB)

    M. Stockton

    2006-01-15

    Section 313 of Emergency Planning and Community Right-to-Know Act (EPCRA) specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. For reporting year 2004, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead compounds, nitric acid, and nitrate compounds as required under the EPCRA Section 313. No other EPCRA Section 313 chemicals were used in 2004 above the reportable thresholds. This document provides a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2004, as well as background information about data included on the Form R reports.

  7. Teacher Attitudes on Including Students with Behavior Intervention Plans in a High-School Inclusive Classroom

    Science.gov (United States)

    Tucker, Thurman D.

    2017-01-01

    This research examined attitudes to determine factors influencing teachers' attitudes toward including students with behavior intervention plans in inclusive high-school classrooms. For Research Question 1 one-way ANOVAs analyzed quantitative data with no significant differences found and qualitative data discovered common patterns that BIPs are…

  8. Planning and Producing Audiovisual Materials. Third Edition.

    Science.gov (United States)

    Kemp, Jerrold E.

    A revised edition of this handbook provides illustrated, step-by-step explanations of how to plan and produce audiovisual materials. Included are sections on the fundamental skills--photography, graphics and recording sound--followed by individual sections on photographic print series, slide series, filmstrips, tape recordings, overhead…

  9. Chesapeake Highway Advisories Routing Traffic, Chart, Business Plan

    Science.gov (United States)

    1996-10-01

    THE BUSINESS PLAN IS ORGANIZED INTO FOUR MAJOR SECTIONS. THE FIRST SECTION IS INTRODUCTORY IN NATURE AND PROVIDES BACKGROUND INFORMATION ON ITS AND THE CHART PROGRAM IN MARYLAND. IT INCLUDES THE CHART MISSION, GOALS AND OBJECTIVES, AS WELL AS OVERVIE...

  10. EDITORIAL: Special section: Selected papers from the Third European Workshop on Monte Carlo Treatment Planning (MCTP2012) Special section: Selected papers from the Third European Workshop on Monte Carlo Treatment Planning (MCTP2012)

    Science.gov (United States)

    Spezi, Emiliano; Leal, Antonio

    2013-04-01

    The Third European Workshop on Monte Carlo Treatment Planning (MCTP2012) was held from 15-18 May, 2012 in Seville, Spain. The event was organized by the Universidad de Sevilla with the support of the European Workgroup on Monte Carlo Treatment Planning (EWG-MCTP). MCTP2012 followed two successful meetings, one held in Ghent (Belgium) in 2006 (Reynaert 2007) and one in Cardiff (UK) in 2009 (Spezi 2010). The recurrence of these workshops together with successful events held in parallel by McGill University in Montreal (Seuntjens et al 2012), show consolidated interest from the scientific community in Monte Carlo (MC) treatment planning. The workshop was attended by a total of 90 participants, mainly coming from a medical physics background. A total of 48 oral presentations and 15 posters were delivered in specific scientific sessions including dosimetry, code development, imaging, modelling of photon and electron radiation transport, external beam radiation therapy, nuclear medicine, brachitherapy and hadrontherapy. A copy of the programme is available on the workshop's website (www.mctp2012.com). In this special section of Physics in Medicine and Biology we report six papers that were selected following the journal's rigorous peer review procedure. These papers actually provide a good cross section of the areas of application of MC in treatment planning that were discussed at MCTP2012. Czarnecki and Zink (2013) and Wagner et al (2013) present the results of their work in small field dosimetry. Czarnecki and Zink (2013) studied field size and detector dependent correction factors for diodes and ion chambers within a clinical 6MV photon beam generated by a Siemens linear accelerator. Their modelling work based on the BEAMnrc/EGSnrc codes and experimental measurements revealed that unshielded diodes were the best choice for small field dosimetry because of their independence from the electron beam spot size and correction factor close to unity. Wagner et al (2013

  11. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated

  12. Idaho National Engineering Laboratory Conceptual Site Treatment Plan. Sections 1 through 8, Tables 2-1 through 6-1, Figures 1 and 2

    International Nuclear Information System (INIS)

    Eaton, D.

    1993-10-01

    The US Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The FFCAct requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the host state or the US Environmental Protection Agency (EPA) for either approval, approval with modification, or disapproval. The Idaho National Engineering Laboratory (INEL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the FFCAct and is being provided to the State of Idaho, the EPA, and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix A of this document. In addition to aiding the INEL in formulating its Final Proposed STP, this CSTP will also provide information to other DOE sites for use in identifying common technology needs and potential options for treating their wastes. The INEL CSTP is also intended to be used in conjunction with CSTPs from other sites as a basis for nationwide discussions among state regulators, the EPA, and other interested parties on treatment strategies and options, and on technical and equity issues associated with DOE's mixed waste

  13. Including the public in pandemic planning: a deliberative approach

    Directory of Open Access Journals (Sweden)

    Braunack-Mayer Annette J

    2010-08-01

    Full Text Available Abstract Background Against a background of pandemic threat posed by SARS and avian H5N1 influenza, this study used deliberative forums to elucidate informed community perspectives on aspects of pandemic planning. Methods Two deliberative forums were carried out with members of the South Australian community. The forums were supported by a qualitative study with adults and youths, systematic reviews of the literature and the involvement of an extended group of academic experts and policy makers. The forum discussions were recorded with simultaneous transcription and analysed thematically. Results Participants allocated scarce resources of antiviral drugs and pandemic vaccine based on a desire to preserve society function in a time of crisis. Participants were divided on the acceptability of social distancing and quarantine measures. However, should such measures be adopted, they thought that reasonable financial, household and psychological support was essential. In addition, provided such support was present, the participants, in general, were willing to impose strict sanctions on those who violated quarantine and social distancing measures. Conclusions The recommendations from the forums suggest that the implementation of pandemic plans in a severe pandemic will be challenging, but not impossible. Implementation may be more successful if the public is engaged in pandemic planning before a pandemic, effective communication of key points is practiced before and during a pandemic and if judicious use is made of supportive measures to assist those in quarantine or affected by social isolation measures.

  14. Readiness to proceed: Characterization planning basis

    International Nuclear Information System (INIS)

    Adams, M.R.

    1998-01-01

    This report summarizes characterization requirements, data availability, and data acquisition plans in support of the Phase 1 Waste Feed Readiness to Proceed Mid-Level Logic. It summarizes characterization requirements for the following program planning documents: Waste Feed Readiness Mid-Level Logic and Decomposition (in development); Master blue print (not available); Tank Waste Remediation System (TWRS) Operations and Utilization Plan and Privatization Contract; Enabling assumptions (not available); Privatization low-activity waste (LAW) Data Quality Objective (DQO); Privatization high-level waste (HLW) DQO (draft); Problem-specific DQOs (in development); Interface control documents (draft). Section 2.0 defines the primary objectives for this report, Section 3.0 discusses the scope and assumptions, and Section 4.0 identifies general characterization needs and analyte-specific characterization needs or potential needs included in program documents and charts. Section 4.0 also shows the analyses that have been conducted, and the archive samples that are available for additional analyses. Section 5.0 discusses current plans for obtaining additional samples and analyses to meet readiness-to-proceed requirements. Section 6.0 summarizes sampling needs based on preliminary requirements and discusses other potential characterization needs. Many requirements documents are preliminary. In many cases, problem-specific DQOs have not been drafted, and only general assumptions about the document contents could be obtained from the authors. As a result, the readiness-to-proceed characterization requirements provided in this document are evolving and may change

  15. 42 CFR 422.4 - Types of MA plans.

    Science.gov (United States)

    2010-10-01

    ... availability, service area, and quality. (ii) Coordinated care plans may include mechanisms to control... requirements of sections 138 and 220 of the Internal Revenue Code. (3) MA private fee-for-service plan. An MA... Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED...

  16. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Science.gov (United States)

    2010-07-01

    ... response operations on your behalf. You must describe the team's organizational structure as well as the... include the number and types of personnel available from each identified labor source. (d) A planned... primary and secondary radio frequencies that will be used. (e) A listing of the types and characteristics...

  17. [Outcomes after planned home births].

    Science.gov (United States)

    Blix, Ellen; Øian, Pål; Kumle, Merethe

    2008-11-06

    About 150 planned home births take place in Norway annually. Professionals have different opinions on whether such births are safe or not. The aim of the present study was to perform a systematic literature review on maternal and neonatal outcomes after planned home births. A review was performed of literature retrieved from searches in MEDLINE, PubMed, Embase, Cinahl and The Cochrane Library and relevant references found in the articles. The searches were limited to studies published in 1985 and later. 10 studies with data from 30 204 women who had planned and were selected to home birth at the onset of labour were included. Three of the studies had control groups including women with planned hospital births. All included studies were assessed to be of medium quality. Between 9.9 and 23.1 % of women and infants were transferred to hospital during labour or after birth. There were few caesarean sections, other interventions or complications in the studies assessed; the total perinatal mortality rate was 2.9/1000 and the intrapartum mortality rate 0.8/1000. There is no sound basis for discouraging low-risk women from planning a home birth. Results from the included studies do not directly apply to Norwegian conditions. Outcomes and transfers after planned home births should be systematically registered.

  18. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 4, Part B: Chapter 8, Sections 8.0 through 8.3.1.4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 74 figs., 32 tabs.

  19. 2002 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    International Nuclear Information System (INIS)

    Stockton, M.

    2003-01-01

    For reporting year 2002, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead compounds and mercury as required under the Emergency Planning and Community Right-to-Know Act (EPCRA), Section 313. No other EPCRA Section 313 chemicals were used in 2002 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical usage and threshold determinations for LANL for calendar year 2002 as well as provide background information about the data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999 EPA promulgated a final rule on Persistent Bioaccumulative Toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable under EPCRA Section 313. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R

  20. Integrated National Energy Planning (INEP) in developing countries

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    Issues of coordinated energy planning are emphasized, with particular reference to interrelationships among the policies adopted in various energy sub-sectors such as electric power (including hydro, nuclear, geothermal, oil and coal sources), petroleum, natural gas, coal, non-conventional (solar, bio-gas, mini-hydro) and traditional fuels (woodfuel, bagasse or vegetable residue). The scope and objectives of integrated national energy planning, the policy tools available, and constraints particular to the developing countries are discussed next. Section 3.0 outlines how energy planning is carried out, while the problems of implementing the resulting policy conclusions are examined in section 4.0. 5 refs, 4 figs

  1. Russian section of GGOS: Network status and progress

    Directory of Open Access Journals (Sweden)

    A. Ipatov

    2017-03-01

    Full Text Available Establishment of the Russian section in the framework of Global Geodetic Observing System (GGOS is under progress. New components of “Quasar” network observatories, which are included into GGOS global network as core stations, are presented. Recent developments include: two new generation radio telescopes with 13 m antennas at Badary and Zelenchukskaya observatories, water vapor radiometers installed at all observatories and software correlator at the Institute of Applied Astronomy. New and potential developments within other networks belonging to different agencies are also considered in the context of widening of Russian section activity in GGOS project. The paper gives a short overview of status, new components and plans, concerning 5 sub-networks of Federal Agency of Scientific Organizations, Roskosmos, Rosstandard, and Rosreestr. Short overview of the plans on creating Data and Analysis Distributed Center is also given.

  2. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  3. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    International Nuclear Information System (INIS)

    McGowan, S E; Albertini, F; Lomax, A J; Thomas, S J

    2015-01-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties. (paper)

  4. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    Science.gov (United States)

    McGowan, S. E.; Albertini, F.; Thomas, S. J.; Lomax, A. J.

    2015-04-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties.

  5. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  6. The NASA competitive placement plan for positions GS-15 and below (including trades and labor positions)

    Science.gov (United States)

    1993-01-01

    This plan provides the framework for selection based on merit from among the best qualified candidates available. Selections will be made without regard to political, religious, or labor organization affiliation or nonaffiliation, marital status, race, color, sex, national origin, nondisqualifying disability, or age. This plan does not guarantee promotion but rather ensures that all qualified available candidates receive fair and equitable consideration for positions filled under these competitive procedures. Announcing a vacancy under this plan is only one method of locating applicants for a position and can be used in conjunction with other methods. Subject to applicable law and regulation, selection of an individual to fill a position is the decision of management, as is the decision as to the method(s) to be used in identifying candidates. This plan is applicable to all NASA Installations. It covers all positions in the competitive service at (and below) the GS/GM-15 level (including all trades and labor positions), except positions in the Office of the Inspector General. The requirements herein are not intended to, nor should they be construed to limit in any way, the independent personnel authority of the Inspector General under the Inspector General Act, as Amended.

  7. Socioeconomic disadvantage and its implications for population health planning of obesity and overweight, using cross-sectional data from general practices from a regional catchment in Australia

    OpenAIRE

    Ghosh, Abhijeet; Charlton, Karen E; Batterham, Marijka J

    2016-01-01

    Objectives To identify smaller geographic and region-specific evidence to inform population health planning for overweight and obesity. Design Cross-sectional secondary analysis of data. Setting Primary healthcare?17 general practices located in the Illawarra-Shoalhaven region of New South Wales (NSW). Participants A subset (n=36?674) of the Sentinel Practices Data Sourcing project adult persons data set (n=118?794) that included information on disease status of all adult patients who had hei...

  8. Plan 2000. The electricity companies plan for electricity conservation in the millennium; Plan 2000. Elselskabernes plan for elbesparelser i det nye aartusinde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Plan 2000 presents an account of the activities in the years 1997 and 1998 and a budget for the year 2000 and forwards. The report includes all 82 electricity companies in Denmark. Furthermore a number of particular analyses of relevance to electricity conservation are presented. All electricity companies work to promote electricity conservation. All consumption sizes and sections are covered. The activities in the individual companies are supported by a number of common campaigns. In Plan 2000 those activities are presented and the economics is analysed. The activities in the first year of the plan are expected to result in conservation corresponding 4% of the present electricity consumption. 80% of the conservation comes from activities, which are measurable. Technical counselling of trade customers is one of the essential activities. Others are e.g. telephone counselling, theme arrangements and teaching of pupils. (EHS)

  9. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  10. System i Disaster Recovery Planning

    CERN Document Server

    Dolewski, Richard

    2008-01-01

    Mapping out all the preparations necessary for an effective disaster recovery plan and its safeguard-a continuous maintenance program-this guide is aimed at IT managers of small and medium businesses. The opening section covers the initial steps of auditing vulnerability, ranking essential IT functions, and reviewing the storage of tape backups, with the following discussion focused on the elements of the plan itself. The plan includes a mission statement, a definition of disaster, the assignment of staff to teams, methods of compensating for human error, and standards for documenting the step

  11. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 5, Part B: Chapter 8, Sections 8.3.1.5 through 8.3.1.17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the SOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  12. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 5, Part B: Chapter 8, Sections 8.3.1.5 through 8.3.1.17

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the SOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules

  13. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.

  14. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs

  15. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 6, Part B: Chapter 8, Sections 8.3.2 through 8.3.4.4

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 35 figs., 70 tabs

  16. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs

  17. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs.

  18. ERISA and health plans.

    Science.gov (United States)

    Schmidt, P; Mazo, J; Ladenheim, K

    1995-11-01

    This Issue Brief is designed to provide a basic understanding of the relationship of the Employee Retirement Income Security Act of 1974 (ERISA) to health plans. It is based, in part, on an Employee Benefit Research Institute-Education and Research Fund (EBRI-ERF) educational briefing held in March 1995. This report includes a section by Peter Schmidt of Arnold & Porter, a section about multiemployer plans written by Judy Mazo of The Segal Company; and a section about ERISA and state health reform written by Kala Ladenheim of the Intergovernmental Health Policy Project. Starting in the late 1980s, three trends converged to make ERISA a critical factor in state health reforms: increasingly comprehensive state health policy experimentation; changes in the makeup of the insurance market (including the rise in self-insurance and the growth of managed care); and increasingly expansive interpretations of ERISA by federal courts. The changing interpretations of ERISA's relationship to three categories of state health initiatives--insurance mandates, medical high risk pools, and uncompensated care pools--illustrate how these forces are playing out today. ERISA does have a very broad preemptive effect. Federal statutes do not need to say anything about preemption in order to preempt state law. For example, if there is a direct conflict, it would be quite clear under the Supremacy Clause [of the U.S. Constitution] that ERISA, or any federal statue, would preempt a directly conflicting state statute. States can indirectly regulate health care plans that provide benefits through insurance contracts by establishing the terms of the contract. And they also raise money by imposing premium taxes. But they cannot do the same with respect to self-funded plans. That is one of the factors that has caused a great rise in the number of self-funded plans. State regulation [of employee benefits] can create three kinds of problems: cost of taxes, fees, or other charges; cost of dealing

  19. 2006 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    Energy Technology Data Exchange (ETDEWEB)

    Ecology and Air Quality Group (ENV-EAQ)

    2007-12-12

    For reporting year 2006, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead as required under the Emergency Planning and Community Right-to-Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2006 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2006, as well as to provide background information about data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999, EPA promulgated a final rule on persistent bioaccumulative toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R.

  20. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  1. On the question of a site plan approval procedure for large-scale power stations

    International Nuclear Information System (INIS)

    Roemermann, K.

    1982-01-01

    The author discusses the question whether a plan approval procedure for large-sclae power plants might contribute to shortening the period of time currently used for the licensing of such plants. On the basis of current practice which includes a planning and building permission by virtue of section 35 of the building law (BBauG) together with an approval of plans within the framework of regional planning, the author explains and discusses various models of site plan approval procedures, (a.o. section 38 of the Federal building law). (HP) [de

  2. Emergency Planning and Community Right-To-Know Act, Section 311

    International Nuclear Information System (INIS)

    Evans, R.A.

    1997-05-01

    Included in this report is a list of hazardous and extremely hazardous chemicals at the Oak Ridge Y-12 Plant. The information reflects changes in the lists of hazardous chemicals present at this facility in amounts equal to or greater than 10,000 pounds and extremely hazardous chemicals present in amounts equal to or greater than 500 pounds or its Threshold Planning Quantity, whichever was less. These lists represent the following: List of materials last reported in March 1996 (reference Y/TS-1482); Materials to be deleted from list; Materials to be added to list; and Revised lists of materials

  3. HOW TO INCLUDE KEY COMPETENCES IN THE COURSE PLAN

    OpenAIRE

    Benito García Peinado

    2009-01-01

    In our school we have decided to develop the teaching approaches to key competences through an organizational model that could be called "the model of the educational basic training". When suggesting new planning, we think that we must offer some solutions which start from the classroom routines and help us to choose the best aspects of these methods to improve them.

  4. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  5. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  6. A Seven-Step Business Plan Methodology To Develop and Manage Certificate Programs.

    Science.gov (United States)

    Cherif, Karim

    2000-01-01

    Outlines a process for writing a business plan for university certificate programs. The plan's sections include executive summary, rationale and objectives, prospective student profile, external involvement, program characteristics, marketing and promotion, and program administration. (SK)

  7. HOW TO INCLUDE KEY COMPETENCES IN THE COURSE PLAN

    Directory of Open Access Journals (Sweden)

    Benito García Peinado

    2009-04-01

    Full Text Available In our school we have decided to develop the teaching approaches to key competences through an organizational model that could be called "the model of the educational basic training". When suggesting new planning, we think that we must offer some solutions which start from the classroom routines and help us to choose the best aspects of these methods to improve them.

  8. 18 CFR 380.16 - Environmental reports for section 216 Federal Power Act Permits.

    Science.gov (United States)

    2010-04-01

    .... (3) Discuss design and operational measures to avoid or reduce risk. (4) Discuss contingency plans... sufficient detail to provide a full understanding of the project including: (i) Plans (overhead view); (ii) Elevations (front view); (iii) Profiles (side view); and (iv) Sections. (2) The applicant may submit...

  9. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  10. Family planning in conflict: results of cross-sectional baseline surveys in three African countries.

    Science.gov (United States)

    McGinn, Therese; Austin, Judy; Anfinson, Katherine; Amsalu, Ribka; Casey, Sara E; Fadulalmula, Shihab Ibrahim; Langston, Anne; Lee-Jones, Louise; Meyers, Janet; Mubiru, Frederick Kintu; Schlecht, Jennifer; Sharer, Melissa; Yetter, Mary

    2011-07-13

    Despite the serious consequences of conflict for reproductive health, populations affected by conflict and its aftermath face tremendous barriers to accessing reproductive health services, due to insecurity, inadequate numbers of trained personnel and lack of supplies. Family planning is often particularly neglected. In six conflict-affected areas in Sudan, northern Uganda and the Democratic Republic of Congo, household surveys of married or in-union women of reproductive age were conducted to determine baseline measures of family planning knowledge, attitudes and behaviors regarding contraception. Health facility assessments were carried out to assess baseline measures of family planning services availability. Data were double-entered into CSPro 3.2 and exported to SAS 9.2, which was used to calculate descriptive statistics. The studies' purposes were to guide program activities and to serve as a baseline against which program accomplishments could be measured. Knowledge of modern contraceptive methods was low relative to other sub-Saharan African countries, and use of modern methods was under 4% in four sites; in two sites with prior family planning services it was 12% and 16.2%. From 30% to 40% of women reported they did not want a child within two years, however, and an additional 12% to 35% wanted no additional children, suggesting a clear need for family planning services. The health facilities assessment showed that at most only one-third of the facilities mandated to provide family planning had the necessary staff, equipment and supplies to do so adequately; in some areas, none of the facilities were prepared to offer such services. Family planning services are desired by women living in crisis situations when offered in a manner appropriate to their needs, yet services are rarely adequate to meet these needs. Refugee and internally displaced women must be included in national and donors' plans to improve family planning in Africa.

  11. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  12. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Science.gov (United States)

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the.... When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or... for monitoring plans and reports. 108.20 Section 108.20 Housing and Urban Development Regulations...

  13. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    Science.gov (United States)

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  14. 47 CFR 90.531 - Band plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Band plan. 90.531 Section 90.531...-805 MHz Bands § 90.531 Band plan. This section sets forth the band plan for the 763-775 MHz and 793... and portables subject to Commission-approved regional planning committee regional plans. Transmitter...

  15. Agribusiness Planning - Teaching and Cases at the University of Saskatchewan, Canada

    OpenAIRE

    Brown, William J.

    2005-01-01

    The University of Saskatchewan (U of S) offers 2 courses in agribusiness planning where students form groups of 3 or 4 and prepare a complete business plan for an actual or planned agribusiness. Individuals or groups wishing to have a agribusiness plan completed can apply to the U of S and a student group will be assigned to their project. The components of a business plan includes the following sections; the executive summary, the introduction to the business being planned, the industry over...

  16. Timing of planned repeat cesarean delivery after two or more previous cesarean sections--risk for unplanned cesarean delivery and pregnancy outcome.

    Science.gov (United States)

    Melamed, Nir; Hadar, Eran; Keidar, Liron; Peled, Yoav; Wiznitzer, Arnon; Yogev, Yariv

    2014-03-01

    objective: To assess the effect of the scheduled gestational age for a repeat planned cesarean section (CS) on the risk for adverse pregnancy outcome in women with two or more previous CS. A retrospective cohort study of all women after ≥2 previous CS who were scheduled for a repeat planned CS. Women were divided into two groups at which the planned CS was scheduled: 38-week group or 39-week group. Overall, 377 were enrolled, 264 (70.0%) and 113 (30.0%) in the 38-week and the 39-week groups, respectively. The rate of an unplanned CS was significantly higher in the 39-week versus the 38-week group (23.0% versus 13.3%, p = 0.02). A repeat planned CS scheduled to week 39 was associated with an increased risk of maternal adverse outcome (31.9% versus 21.6%, p = 0.03). There was no significant difference in the rate of adverse neonatal outcome between the two groups (20.8% versus 23.0%, p = 0.5). The lowest rate of any adverse outcome (maternal and/or neonatal) was observed when CS was scheduled to 38 + 1 weeks of gestation. In women after two cesarean sections, scheduling a planned CS at around 39 weeks compared with at around 38 weeks is associated with an increased risk for maternal adverse outcome with no apparent advantage in terms of neonatal outcome.

  17. Optimality of profit-including prices under ideal planning.

    Science.gov (United States)

    Samuelson, P A

    1973-07-01

    Although prices calculated by a constant percentage markup on all costs (nonlabor as well as direct-labor) are usually admitted to be more realistic for a competitive capitalistic model, the view is often expressed that, for optimal planning purposes, the "values" model of Marx's Capital, Volume I, is to be preferred. It is shown here that an optimal-control model that maximizes discounted social utility of consumption per capita and that ultimately approaches a steady state must ultimately have optimal pricing that involves equal rates of steady-state profit in all industries; and such optimal pricing will necessarily deviate from Marx's model of equal rates of surplus value (markups on direct-labor only) in all industries.

  18. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 22 figs

  19. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 22 figs.

  20. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 7 refs., 21 figs

  1. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 7 refs., 21 figs.

  2. 14 CFR 152.105 - Sponsors and planning agencies: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Sponsors and planning agencies: Airport planning. 152.105 Section 152.105 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF....105 Sponsors and planning agencies: Airport planning. (a) To be eligible to apply for a project for...

  3. Including the Consumer and Environment in Occupational Therapy Treatment Planning.

    Science.gov (United States)

    Brown, Catana; Bowen, Robin E.

    1998-01-01

    Occupational therapists (n=29) completed treatment plans based on case study data. Analysis indicated they often identified goals not addressed by the consumer/client. They significantly selected more simulated than real activities and more activities designed to change the person rather than the environment. (SK)

  4. 29 CFR 778.214 - Benefit plans; including profit-sharing plans or trusts providing similar benefits.

    Science.gov (United States)

    2010-07-01

    ... fide plan for providing old age, retirement, life, accident, or health insurance or similar benefits... employee on account of severance of employment (or for any other reason) would not result in any increase... mechanics performing contract work subject to the Davis-Bacon Act and related statutes, the provisions of...

  5. Family planning in conflict: results of cross-sectional baseline surveys in three African countries

    Directory of Open Access Journals (Sweden)

    Lee-Jones Louise

    2011-07-01

    Full Text Available Abstract Background Despite the serious consequences of conflict for reproductive health, populations affected by conflict and its aftermath face tremendous barriers to accessing reproductive health services, due to insecurity, inadequate numbers of trained personnel and lack of supplies. Family planning is often particularly neglected. Methods In six conflict-affected areas in Sudan, northern Uganda and the Democratic Republic of Congo, household surveys of married or in-union women of reproductive age were conducted to determine baseline measures of family planning knowledge, attitudes and behaviors regarding contraception. Health facility assessments were carried out to assess baseline measures of family planning services availability. Data were double-entered into CSPro 3.2 and exported to SAS 9.2, which was used to calculate descriptive statistics. The studies' purposes were to guide program activities and to serve as a baseline against which program accomplishments could be measured. Results Knowledge of modern contraceptive methods was low relative to other sub-Saharan African countries, and use of modern methods was under 4% in four sites; in two sites with prior family planning services it was 12% and 16.2%. From 30% to 40% of women reported they did not want a child within two years, however, and an additional 12% to 35% wanted no additional children, suggesting a clear need for family planning services. The health facilities assessment showed that at most only one-third of the facilities mandated to provide family planning had the necessary staff, equipment and supplies to do so adequately; in some areas, none of the facilities were prepared to offer such services. Conclusions Family planning services are desired by women living in crisis situations when offered in a manner appropriate to their needs, yet services are rarely adequate to meet these needs. Refugee and internally displaced women must be included in national and donors

  6. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  7. 26 CFR 1.457-7 - Taxation of Distributions Under Eligible Plans.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 6 2010-04-01 2010-04-01 false Taxation of Distributions Under Eligible Plans. 1.457-7 Section 1.457-7 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY...-7 Taxation of Distributions Under Eligible Plans. (a) General rules for when amounts are included in...

  8. Savannah River Certification Plan for newly generated, contact-handled transuranic waste

    International Nuclear Information System (INIS)

    Wierzbicki, K.S.

    1986-01-01

    This Certification Plan document describes the necessary processes and methods for certifying unclassified, newly generated, contact-handled solid transuranic (TRU) waste at the Savannah River Plant and Laboratory (SRP, SRL) to comply with the Waste Isolation Pilot Plant Waste Acceptance Criteria (WIPP-WAC). Section 2 contains the organizational structure as related to waste certification including a summary of functional responsibilities, levels of authority, and lines of communication of the various organizations involved in certification activities. Section 3 describes general plant operations and TRU waste generation. Included is a description of the TRU Waste classification system. Section 4 contains the SR site TRU Waste Quality Assurance Program Plan. Section 5 describes waste container procurement, inspection, and certification prior to being loaded with TRU waste. Certification of waste packages, after package closure in the waste generating areas, is described in Section 6. The packaging and certification of individual waste forms is described in Attachments 1-5. Included in each attachment is a description of controls used to ensure that waste packages meet all applicable waste form compliance requirements for shipment to the WIPP. 3 figs., 3 tabs

  9. Standard Review Plan for the review of safety analysis reports for nuclear power plants, Revision No. 7 to Section 9

    International Nuclear Information System (INIS)

    1978-03-01

    Revision No. 1 to Section 9 of the Standard Review Plan incorporates changes that have been developed since the original issuance in September 1975, many of which are editorial in nature, to reflect current staff practice in the review of safety analysis reports for nuclear power plants

  10. Self-management interventions including action plans for exacerbations versus usual care in patients with chronic obstructive pulmonary disease.

    Science.gov (United States)

    Lenferink, Anke; Brusse-Keizer, Marjolein; van der Valk, Paul Dlpm; Frith, Peter A; Zwerink, Marlies; Monninkhof, Evelyn M; van der Palen, Job; Effing, Tanja W

    2017-08-04

    Chronic Obstructive Pulmonary Disease (COPD) self-management interventions should be structured but personalised and often multi-component, with goals of motivating, engaging and supporting the patients to positively adapt their behaviour(s) and develop skills to better manage disease. Exacerbation action plans are considered to be a key component of COPD self-management interventions. Studies assessing these interventions show contradictory results. In this Cochrane Review, we compared the effectiveness of COPD self-management interventions that include action plans for acute exacerbations of COPD (AECOPD) with usual care. To evaluate the efficacy of COPD-specific self-management interventions that include an action plan for exacerbations of COPD compared with usual care in terms of health-related quality of life, respiratory-related hospital admissions and other health outcomes. We searched the Cochrane Airways Group Specialised Register of trials, trials registries, and the reference lists of included studies to May 2016. We included randomised controlled trials evaluating a self-management intervention for people with COPD published since 1995. To be eligible for inclusion, the self-management intervention included a written action plan for AECOPD and an iterative process between participant and healthcare provider(s) in which feedback was provided. We excluded disease management programmes classified as pulmonary rehabilitation or exercise classes offered in a hospital, at a rehabilitation centre, or in a community-based setting to avoid overlap with pulmonary rehabilitation as much as possible. Two review authors independently assessed trial quality and extracted data. We resolved disagreements by reaching consensus or by involving a third review author. Study authors were contacted to obtain additional information and missing outcome data where possible. When appropriate, study results were pooled using a random-effects modelling meta-analysis. The primary

  11. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Science.gov (United States)

    2010-07-01

    .... 155, App. C Appendix C to Part 155—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan dealing with training is one of the key elements of a response plan. This concept is... included training as one of the sections required in a vessel or facility response plan. In reviewing...

  12. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  13. Environmental monitoring plan - environmental monitoring section. Revision 1

    International Nuclear Information System (INIS)

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures

  14. 6 CFR 37.41 - Security plan.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Security plan. 37.41 Section 37.41 Domestic... Security plan. (a) In General. States must have a security plan that addresses the provisions in paragraph (b) of this section and must submit the security plan as part of its REAL ID certification under § 37...

  15. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  16. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  17. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  18. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  19. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  20. 36 CFR 800.2 - Participants in the Section 106 process.

    Science.gov (United States)

    2010-07-01

    ... legal and financial responsibility for section 106 compliance in accordance with subpart B of this part... that historic properties are taking into consideration at all levels of planning and development. (ii... properties, including those of traditional religious and cultural importance, articulate its views on the...

  1. [Materiality Analysis of Health Plans Based on Stakeholder Engagement and the Issues Included at ISO 26000:2010].

    Science.gov (United States)

    Moyano Santiago, Miguel Angel; Rivera Lirio, Juana María

    2017-01-18

    Health plans of the Spanish autonomous communities can incorporate sustainable development criteria in its development. There have been no analysis or proposals about development and indicators. The goal is to add a contribution to help build better health plans aimed at sustainable development and help to manage economic, social and environmental impacts of health systems criteria. We used a variation of the RAND/UCLA or modified Delphi technique method. The process consisted of a bibliographical and context matters and issues related to health and social responsibility analysis based on ISO 26000: 2010. A survey by deliberately to a selection of 70 expert members of the identified stakeholders was carried out and a discussion group was held to determine the consensus on the issues addressed in the survey sample. The research was conducted in 2015. From the literature review 33 health issues included in ISO 26000:2010 were obtained. 7 survey proved relevant high consensus, 8 relevance and average consensus and 18 with less relevance and high level of dissent. The expert group excluded 4 of the 18 subjects with less consensus. 29 issues included 33 at work, divided into 7 subjects contained in the guide ISO 26000 of social responsibility, were relevant stakeholders regarding possible inclusion in health plans. Considering the direct relationship published by ISO (International Organization for Standardization) among the issues ISO 26000 and the economic, social and environmental indicators in GRI (Global Reporting Initiative) in its G4 version, a panel with monitoring indicators related to relevant issues were elaborated.

  2. Precision IORT - Image guided intraoperative radiation therapy (igIORT) using online treatment planning including tissue heterogeneity correction.

    Science.gov (United States)

    Schneider, Frank; Bludau, Frederic; Clausen, Sven; Fleckenstein, Jens; Obertacke, Udo; Wenz, Frederik

    2017-05-01

    To the present date, IORT has been eye and hand guided without treatment planning and tissue heterogeneity correction. This limits the precision of the application and the precise documentation of the location and the deposited dose in the tissue. Here we present a set-up where we use image guidance by intraoperative cone beam computed tomography (CBCT) for precise online Monte Carlo treatment planning including tissue heterogeneity correction. An IORT was performed during balloon kyphoplasty using a dedicated Needle Applicator. An intraoperative CBCT was registered with a pre-op CT. Treatment planning was performed in Radiance using a hybrid Monte Carlo algorithm simulating dose in homogeneous (MCwater) and heterogeneous medium (MChet). Dose distributions on CBCT and pre-op CT were compared with each other. Spinal cord and the metastasis doses were evaluated. The MCwater calculations showed a spherical dose distribution as expected. The minimum target dose for the MChet simulations on pre-op CT was increased by 40% while the maximum spinal cord dose was decreased by 35%. Due to the artefacts on the CBCT the comparison between MChet simulations on CBCT and pre-op CT showed differences up to 50% in dose. igIORT and online treatment planning improves the accuracy of IORT. However, the current set-up is limited by CT artefacts. Fusing an intraoperative CBCT with a pre-op CT allows the combination of an accurate dose calculation with the knowledge of the correct source/applicator position. This method can be also used for pre-operative treatment planning followed by image guided surgery. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  3. Pathologic Analysis of Control Plans for Air Pollution Management in Tehran Metropolis: A Cross-Sectional Study.

    Science.gov (United States)

    Salehi Shahrabi, Narges; Pourezzat, Aliasghar; Mobaraki, Hossein; Mafimoradi, Shiva

    2013-11-01

    The centralization of human activities is associated with different pollutants which enter into environment easily and cause the urban environment more vulnerable. Regarding the importance of air pollution issue for Tehran metropolis, many plans and regulations have been developed. However, most of them failed to decline the pollution. The purpose of this study was to pathologically analyze air-pollution control plans to offer effective solutions for Tehran metropolis. A Qualitative content analysis in addition to a semi-structured interview with 14 practicing professional were used to identify 1) key sources of Tehran's air pollution, 2) recognize challenges towards effective performance of pertinent plans and 3), offer effective solutions. Related challenges to air-pollution control plans can be divided into two major categories including lack of integrated and organized stewardship and PEST challenges. For controlling the air pollution of Tehran effectively, various controlling alternatives were identified as systematization of plan preparation process, standardization and utilization of new technologies & experts, infrastructural development, realization of social justice, developing coordination mechanisms, improving citizens' participatory capacity and focusing on effective management of fuel and energy. Controlling air pollution in Tehran needs a serious attention of policymakers to make enforcements through applying a systemic cycle of preparation comprehensive plans. Further, implement the enforcements and evaluate the environmental impact of the plans through involving all stakeholders.

  4. National Energy Board 1992-93 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs

  5. National Energy Board 1992-93 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs.

  6. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.

  7. 7 CFR 1210.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plan. 1210.303 Section 1210.303 Agriculture... PLAN Watermelon Research and Promotion Plan Definitions § 1210.303 Plan. Plan means this watermelon research and promotion Plan issued by the Secretary pursuant to the Act. ...

  8. Institutional plan FY 1998--FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

  9. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.

  10. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.; Olson, Karl R.; Grether, Donald F.; Clary, Mary M.; Smith, Brian M.; Stevens, David F.; Ross, Loren; Alper, Mark D.; Dairiki, Janis M.; Fong, Pauline L.; Bartholomew, James C.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.

  11. Paediatric advance care planning survey: a cross-sectional examination of congruence and discordance between adolescents with HIV/AIDS and their families.

    Science.gov (United States)

    Lyon, Maureen E; Dallas, Ronald H; Garvie, Patricia A; Wilkins, Megan L; Garcia, Ana; Cheng, Yao Iris; Wang, Jichuan

    2017-09-21

    To identify patient-reported paediatric advance care planning (pACP) needs of adolescents living with HIV and to examine the congruence with their family's perception of their needs. A cross-sectional survey among six paediatric hospital-based outpatient HIV specialty clinics. Participants included 48 adolescent/family dyads (n=96 participants) within a larger study facilitating pACP. The main outcome measure was the Lyon Advance Care Planning Survey - Adolescent and Surrogate Versions-Revised. Adolescents' mean age was 18 years (range ≥14-congruence in pACP needs within adolescent/family dyads. There was substantial congruence in that being free from pain (PABAK=0.83), and understanding your treatment choices (PABAK=0.92) were very important or important. There was discordance about being off machines that extend life (PABAK=0.08) and when is the best time to bring up EOL decisions (PABAK=0.32). Areas of discordance were associated with life-sustaining choices and when to have the EOL conversation. Targeted, adolescent/family-centred, evidence-based pACP interventions are needed to improve family understanding of youth's EOL wishes. NCT01289444; Results. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  12. Changing Face of Family Planning Funding in Kenya: A Cross ...

    African Journals Online (AJOL)

    USER

    Changing Face of Family Planning Funding in Kenya: A Cross-. Sectional Survey of ... Keywords: Contraception, Expenditure, Budget, Decision-making. Résumé. A mesure ... increasingly receiving attention, including in. Kenya17. In Kenya ...

  13. Holiday Meal Planning

    Science.gov (United States)

    ... Count Glycemic Index Low-Calorie Sweeteners Sugar and Desserts Fitness Exercise & Type 1 Diabetes Get Started Safely ... plan ahead. Fitting in Sweets Learn about eating desserts on special occasions. In this section Planning Meals ...

  14. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    International Nuclear Information System (INIS)

    2012-01-01

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  15. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  16. Corridor X in Serbia: Approach to spatial planning

    Directory of Open Access Journals (Sweden)

    Milijić Saša

    2003-01-01

    Full Text Available For the infrastructural corridor's area, of the national importance, is predicted making spatial plans of area of special use, as the most complex instruments for the developing and arranging management of these areas. These plans should have an integrative and problem-oriented approach towards development planning and arrangement of such an area, and it is obliged to include: a complex evaluation of state and function of infrastructural system in the corridor; an analysis of infrastructural corridor influence on the development of the planning area and its surrounding; an alternative conception of long-term protection, improvement, organization and use of the planning area; a choice of the priorities and assumption of the realization phases; instructions for the implementation of the plan etc. The approach in making of this category of plans, as well as, experiences in planning, arrangement and use of multimodal corridors, have been considered on the example of Spatial plan of the infrastructural corridor E-75 section Belgrade-Nis area.

  17. 7 CFR 1207.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Plan. 1207.303 Section 1207.303 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.303 Plan. Plan means this potato research and...

  18. Nuclear power programme planning: An integrated approach

    International Nuclear Information System (INIS)

    2001-12-01

    The International Atomic Energy Agency (IAEA) has published material on different policy considerations in the introduction of nuclear power, primarily addressed to top level decision makers in government and industry in Member States. Several Member States and experts recommended to the IAEA to address the aspects of an integrated approach to nuclear power programme planning and to serve as guidance to those countries wishing to embark on a nuclear power programme. As a follow-up, the present publication is primarily intended to serve as guidance for executives and managers in Member States in planning for possible introduction of nuclear power plants in their electricity generating systems. Nuclear power programme planning, as dealt with in this publication, includes all activities that need to be carried out up to a well-founded decision to proceed with a project feasibility study. Project implementation beyond this decision is not in the scope of this publication. Although it is possible to use nuclear energy as a heat source for industrial processes, desalination and other heat applications, it is assumed in this publication that the planning is aimed towards nuclear power for electricity generation. Much of the information given would, however, also be relevant for planning of nuclear reactors for heat production. The publication was prepared within the framework of the IAEA programme on nuclear power planning, implementation and performance as a joint activity of the Nuclear Power Engineering Section and the Planning and Economic Studies Section (Division of Nuclear Power)

  19. Deep-Burn Modular Helium Reactor Fuel Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    McEachern, D

    2002-12-02

    This document contains the workscope, schedule and cost for the technology development tasks needed to satisfy the fuel and fission product transport Design Data Needs (DDNs) for the Gas Turbine-Modular Helium Reactor (GT-MHR), operating in its role of transmuting transuranic (TRU) nuclides in spent fuel discharged from commercial light-water reactors (LWRs). In its application for transmutation, the GT-MHR is referred to as the Deep-Burn MHR (DB-MHR). This Fuel Development Plan (FDP) describes part of the overall program being undertaken by the U.S. Department of Energy (DOE), utilities, and industry to evaluate the use of the GT-MHR to transmute transuranic nuclides from spent nuclear fuel. The Fuel Development Plan (FDP) includes the work on fuel necessary to support the design and licensing of the DB-MHR. The FDP is organized into ten sections. Section 1 provides a summary of the most important features of the plan, including cost and schedule information. Section 2 describes the DB-MHR concept, the features of its fuel and the plan to develop coated particle fuel for transmutation. Section 3 describes the knowledge base for fabrication of coated particles, the experience with irradiation performance of coated particle fuels, the database for fission product transport in HTGR cores, and describes test data and calculations for the performance of coated particle fuel while in a repository. Section 4 presents the fuel performance requirements in terms of as-manufactured quality and performance of the fuel coatings under irradiation and accident conditions. These requirements are provisional because the design of the DB-MHR is in an early stage. However, the requirements are presented in this preliminary form to guide the initial work on the fuel development. Section 4 also presents limits on the irradiation conditions to which the coated particle fuel can be subjected for the core design. These limits are based on past irradiation experience. Section 5 describes

  20. 12 CFR 565.5 - Capital restoration plans.

    Science.gov (United States)

    2010-01-01

    ... guarantee of a capital restoration plan shall not limit the liability of the company under any guarantee... full amount of that guarantee from any or all of the companies issuing the guarantee. (2) Failure to... shall be accepted unless it includes any performance guarantee described in section 38(e)(2)(C) of the...

  1. Regional plan throughout sectional bioenergy of Castilla y Leon (PBCYL)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R.; Ayuste, R.; Diez, S.; Munoz, M. (Ente Regional de la Energia de Castilla y Leon, Leon (Spain))

    2009-07-01

    The Bioenergy Action Plan of Castilla y Leon (BAPCyL) is a tool of the Regional Government to set up measures for supporting the bioenergy sector. The plan has been elaborated by experts in energy, agriculture, woodlands, residues and economy from the Junta de castilla y Leon (the region government). The BAPCyL designers for 2020, according to European Union: Mobilize local biomass (1.600 ktep). Reach an electrical power of 260 MWe. provide heating for 250.000 people. Substitution of 10% of fossil fuels used in transport. It proposes a strategy with 50 measures and 100 specific actions, from the raw material to the final consumer: Resources: Plan of Mobilization Wood to increase the offer of the resource. Regional Energy crops Program. Complete the use of biogas from dumps. Improve the management of farmer, agricultures and agroofood residues. Inventory all organic residues available. Boost the associations of biomass producers. Users: Planning big projects. Biomass boilers for public buildings. RTDI in equipment, technology and process. Cross measures: Advising for SMEes and professional training. Biomass handbooks. Promotional campaigns. Standardization of biofuels. Regional Observatory for the bioenergy. (orig.)

  2. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  3. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding ...

  4. 20 CFR 1002.163 - What types of health plans are covered by USERRA?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What types of health plans are covered by USERRA? 1002.163 Section 1002.163 Employees' Benefits OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS... by USERRA? (a) USERRA defines a health plan to include an insurance policy or contract, medical or...

  5. 7 CFR 272.10 - ADP/CIS Model Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false ADP/CIS Model Plan. 272.10 Section 272.10 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... benefit computation (including but not limited to all household members' names, addresses, dates of birth...

  6. Draft Automatic Data Acquisition System Plan

    International Nuclear Information System (INIS)

    1987-04-01

    This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs

  7. Unmet Needs of Family Planning Among Women: A Cross-Sectional Study in a Rural Area of Kanchipuram District, Tamil Nadu, South India.

    Science.gov (United States)

    Vishnu Prasad, R; Venkatachalam, J; Singh, Zile

    2016-10-01

    Global contraceptive usage was 63.3 % in 2010 which was 9 % more than that in 1990. NFHS-III 2005-2006 revealed that the contraceptive prevalence rate was 56 % while in the past decade it was 48 %. In India, female sterilization is the most commonly preferred method of contraception accounting for 76 %, while in Tamil Nadu it was 90 %. Thus, this study aims at measuring the prevalence of unmet needs of family planning and its determinants in a rural area of Kancheepuram district, Tamil Nadu. The study was carried out as a community-based cross-sectional study in Chunambed panchayat, a rural area in Kanchipuram District, Tamil Nadu, India, among 505 women of age group 15-49 years. Cluster random sampling was done to select the households to include in the study. In every household, all the available and eligible women were explained about the study and recruited after obtaining informed consent. Chi-square test was applied for finding the difference in proportion, and p value <0.05 was considered statistically significant. The prevalence of unmet need for family planning in our study population was nearly 31 %; it was even more for younger age groups and for the women whose family size was less. 51.7 % of the participants were currently using a contraceptive measure and very few of their partners used contraception. Government health facilities were the major source of contraceptive service and majority of our participants were well aware about the various contraceptive methods. Unmet needs of family planning were high in our study population, and the knowledge about the contraceptive use and family planning was found to be fairly adequate.

  8. Suicidal ideations, plans and attempts in primary care: cross-sectional study of consultants at primary health care system in Morocco.

    Science.gov (United States)

    Oneib, Bouchra; Sabir, Maria; Otheman, Yassine; Abda, Naima; Ouanass, Abderrazzak

    2016-01-01

    The aim of the study is to estimate the prevalence of suicidal ideation among Moroccan consultants in primary health care system. We conducted a cross sectional survey in three health care centers in two cities of Morocco to estimate the prevalence of suicidal ideation, plan and suicide attempts among 396 consultants in the primary health care system, using the Mini International neuropsychiatric interview. Patients were 18 years and older, without known psychiatric or chronic somatic disease. Statistical analysis was performed by the SPSS 13.0 software. The prevalence of suicidal ideation was 5.3%, and 2.7% of the patients planned their suicide and 1.2% tried to commit suicide. The multivariate analysis did not demonstrate significant association. Suicidal ideation, plan and suicide attempts are prevalent in primary health care patients, but they are still under diagnosed. An adequate training of physicians and the establishment of education programs is essential to reduce the rate of suicide.

  9. An overview of the health economic implications of elective caesarean section.

    Science.gov (United States)

    Petrou, Stavros; Khan, Kamran

    2013-12-01

    The caesarean section rate has continued to increase in most industrialised countries, which raises a number of economic concerns. This review provides an overview of the health economic implications of elective caesarean section. It provides a succinct summary of the health consequences associated with elective caesarean section for both the infant and the mother over the perinatal period and beyond. It highlights factors that complicate our understanding of the health consequences of elective caesarean section, including inconsistencies in definitions and coding of the procedure, failure to adopt an intention-to-treat principle when drawing comparisons, and the widespread reliance on observational data. The paper then summarises the economic costs associated with elective caesarean section. Evidence is presented to suggest that planned caesarean section may be less costly than planned vaginal birth in some clinical contexts, for example where the singleton fetus lies in a breech position at term. In contrast, elective caesarean section (or caesarean section as a whole) appears to be more costly than vaginal delivery (either spontaneous or instrumented) in low-risk or unselected populations. The paper proceeds with an overview of economic evaluations associated with elective caesarean section. All are currently based on decision-analytic models. Evidence is presented to suggest that planned trial of labour (attempted vaginal birth) following a previous caesarean section appears to be a more cost-effective option than elective caesarean section, although its cost effectiveness is dependent upon the probability of successful vaginal delivery. There is conflicting evidence on the cost effectiveness of maternal request caesareans when compared with trial of labour. The paucity of evidence on the value pregnant women, clinicians and other groups in society place on the option of elective caesarean section is highlighted. Techniques that might be used to elicit

  10. 23 CFR 710.303 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 710.303 Section 710.303 Highways FEDERAL... ESTATE Project Development § 710.303 Planning. State and local governments conduct metropolitan and statewide planning to develop coordinated, financially constrained system plans to meet transportation needs...

  11. VOYAGE PLANNING

    Directory of Open Access Journals (Sweden)

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  12. Long-Range Research Plan, FY 1985-FY 1989

    International Nuclear Information System (INIS)

    1984-09-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. This document is divided into the following sections: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; advanced concepts; radiation protection and health effects; and waste management. The following are also listed as appendices: unresolved safety issues and TMI action plan items, priorities for research program, research program outline, and research utilization report. A glossary of acronyms is included

  13. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  14. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  15. 75 FR 64675 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2010-10-20

    ...'s Approval of the El Paso Section 110(a)(1) Maintenance Plan for the 1997 8-Hour Ozone Standard... BPA State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan that includes a 2021 Motor... the 1997 8-hour ozone standard for the El Paso 1997 8-hour attainment area. DATES: Effective Date...

  16. Canadian Nuclear Safety Commission 2003-2004 estimates. Part III - report on plans and priorities

    International Nuclear Information System (INIS)

    2003-01-01

    The Commission replace the Atomic Energy Control Board in 2000 as Canada's independent agency which regulates the use of nuclear energy and materials to protect health, safety, security, and the environment. This report is an individual expenditure plan that provides details on a business line basis and contains information on objectives, initiatives, and planned results, including links to related resource requirements over a three-year period. It also provides details on human resource requirements, major capital projects, grants and contributions, and net program costs. Introductory sections with a minister's message are followed by sections giving a departmental or organization overview; plans, results, activities, resources, and initiatives, as applicable; and financial information

  17. 44 CFR 10.7 - Planning.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Planning. 10.7 Section 10.7... GENERAL ENVIRONMENTAL CONSIDERATIONS Agency Implementing Procedures § 10.7 Planning. (a) Early planning. The Regional Administrator shall integrate the NEPA process with other planning at the earliest...

  18. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  19. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  20. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  1. Vertical drop test of a transport fuselage center section including the wheel wells

    Science.gov (United States)

    Williams, M. S.; Hayduk, R. J.

    1983-01-01

    A Boeing 707 fuselage section was drop tested to measure structural, seat, and anthropomorphic dummy response to vertical crash loads. The specimen had nominally zero pitch, roll and yaw at impact with a sink speed of 20 ft/sec. Results from this drop test and other drop tests of different transport sections will be used to prepare for a full-scale crash test of a B-720.

  2. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  3. Waste Minimization and Pollution Prevention Awareness Plan

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) and other legal requirements that are discussed in Section C, below. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as suggested by DOE Order 5400.1. The intent of this plan is to respond to and comply with the Department's policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Directorate-, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Directorates, Programs and Departments. Several Directorates have been reorganized, necessitating changes in the Directorate plans that were published in 1991

  4. 34 CFR 606.8 - What is a comprehensive development plan and what must it contain?

    Science.gov (United States)

    2010-07-01

    ... comprehensive development plan is an institution's strategy for achieving growth and self-sufficiency by... comprehensive development plan must include the following: (1) An analysis of the strengths, weaknesses, and... fiscal stability, based on the outcomes of the analysis described in paragraph (b)(1) of this section. (3...

  5. 34 CFR 607.8 - What is a comprehensive development plan and what must it contain?

    Science.gov (United States)

    2010-07-01

    ... development plan is an institution's strategy for achieving growth and self-sufficiency by strengthening its... development plan must include the following: (1) An analysis of the strengths, weaknesses, and significant... stability, based on the outcomes of the analysis described in paragraph (b)(1) of this section. (3...

  6. Advance care planning: the impact of Ceiling of Treatment plans in patients with Coordinate My Care.

    Science.gov (United States)

    Broadhurst, Helen Lucy; Droney, Joanne; Callender, Tom; Shaw, Amanda; Riley, Julia

    2018-03-22

    The aim of this evaluation is to describe the components and results of urgent care planning in Coordinate My Care (CMC), a digital clinical service for patients with life-limiting illness, for use if a patient is unable to make or express choices. Ceiling of treatment (CoT) plans were created detailing where the patient would like to receive their care and how aggressive medical interventions should be. A retrospective service evaluation was completed of all CMC records created between December 2015 and September 2016 (n=6854). CMC records were divided into two cohorts: those with a CoT plan and those without. The factors associated with these cohorts were reviewed including age, diagnosis, resuscitation status and preferences for place of death (PPD). Analysis of the non-mandatory free text section was carried out. Two-thirds of patients had recorded decisions about CoT. Regardless of which CoT option was chosen, for most patients, PPD was home or care home. Patients with a CoT plan were more likely to have a documented resuscitation status.Patients with a CoT were more likely to die in their PPD (82%vs71%, OR 1.79, pcare planning. Three facets of urgent care planning identified include PPD, CoT and resuscitation status. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  7. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  8. Annual plan, December 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  9. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  10. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  11. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  12. Orienteering section as a form of extracurricular activities in physical education

    Directory of Open Access Journals (Sweden)

    Vukadinović Nenad

    2015-01-01

    Full Text Available Extracurricular activities offer students the opportunity to learn and train sports not provided by curriculum of physical education. Staying active in nature in terms of the orientation movement is greatly beneficial for the development of mental and physical abilities. The aim of this paper is to present opportunities for the organizing orienteering section in elementary school. Descriptive method was applied to be shown plan and program of the section designed so that teachers of physical education in their schools provide implementation of orienteering section for 30 classes. The expected outcome of orienteering section is to enable students to independently perform at competitions. Training is done through the implementation of goals and objectives of sections, using methodological procedures with respect to the pupils' age, prior knowledge and the pace of overcoming the training. Plan and program section includes mastering the basic technique in orienteering, through theoretical and practical work. In working with students who are for the first time in orienteering, the main focus should be on reading the maps, and understanding the relationship between nature and maps. In primary schools there are possibilities to organize orienteering section, and there is a significant correlation with other subjects. The presented model provides the optimal level of theoretical and practical knowledge that students can apply in school competitions.

  13. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    1996-08-01

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  14. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    Energy Technology Data Exchange (ETDEWEB)

    Wu, C [Sutter Medical Foundation, Roseville, CA (United States)

    2016-06-15

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  15. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    International Nuclear Information System (INIS)

    Wu, C

    2016-01-01

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  16. Preliminary study for the National Energy Plan (PEN) uses the Community market as a reference base. El ante-proyecto del Plan Energetico Nacional (PEN) toma referencia basica del mercado comunitario

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    The National Energy Plan (PEN) for the period 1991 to 2000 lays down basic guidelines for a Spanish energy policy. This includes a wide range of economic measures. The PEN is divided into five main sections with two appendices. The sections are: the international situation; energy demand; energy supply; energy and the environment; and R D policy. The appendices are: Energy-saving and energy-efficiency plan; and General plan for radioactive waste. The PEN provides for 4-year research programmes which aim to reduce the environmental impact of energy production and use. General demand for energy during this period will increase by2.4% and investment in power installations and in the gas sector will be some 1.5 thousand million pesetas. 4 figs., 3 tabs.

  17. Report to Congress on status of emergency response planning for nuclear power plants

    International Nuclear Information System (INIS)

    1981-03-01

    This report responds to a request (Public Law 96-295, Section 109) for the Nuclear Regulatory Commission (NRC) to report to Congress on the status of emergency response planning in support of nuclear power reactors. The report includes information on the status of this planning as well as on the Commission actions relating to emergency preparedness. These actions include a summary of the new regulatory requirements and the preliminary results of two comprehensive Evacuation Time Estimate studies; one requested by the NRC including 50 nuclear power plant sites and one conducted by the Federal Emergency Management Agency (FEMA) for 12 high population density sites. FEMA provided the information in this report on the status of State and local planning, including projected schedules for joint State/county/licensee emergency preparedness exercises. Included as Appendicies are the NRC Emergency Planning Final Regulations, 10 CFR Part 50 (45 FR 55402), the FEMA Proposed Rule, 'Review and Approval of State and Local Radiological Emergency Plans and Preparedness', 44 CFR Part 350 (45 FR 42341) and the NRC/FEMA Memorandums of Understanding

  18. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... activities In your community Funding opportunities Internships and jobs View all pages in this section Back to section menu It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Breastfeeding myths in ...

  19. 24 CFR 91.415 - Strategic plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Strategic plan. 91.415 Section 91... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated Plan § 91.415 Strategic plan. Strategies and priority needs must be described in the consolidated plan...

  20. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  1. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  2. 40 CFR 52.515 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... Natural Resources and Environmental Control. (19) The Plan revision entitled “Revisions to the..., Cylinder wipe, Emission unit, Federally enforceable, Flexography, Fugitive emission, Gas services, Gas..., Freeboard ratio, Mayor, Vehicular fuel tank. Abbreviations: (Degree), VOC, “%”. (ii) Additional material. (A...

  3. 30 CFR 282.23 - Testing Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies...

  4. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  5. Nuclear reactors built, being built, or planned: 1987

    International Nuclear Information System (INIS)

    1988-06-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1987. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually for Washington headquarters and field offices of DOE; from the US Nuclear regulatory Commission; from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The major change in this revision involves the data related to shutdown and dismantled facilities. Because this information serves substantially different purposes, it has been accumulated in a separate section, ''Reactors and Facilities Shutdown or Dismantled.'' Cancelled reactors or reactors whose progress has been terminated at some stage before operation are included in this section

  6. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  7. 17 CFR 270.17d-1 - Applications regarding joint enterprises or arrangements and certain profit-sharing plans.

    Science.gov (United States)

    2010-04-01

    ... Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) RULES AND REGULATIONS, INVESTMENT COMPANY... or stock purchase plan, but shall not include an investment advisory contract subject to section 15..., stock option or stock purchase plan provided by any controlled company which is not an investment...

  8. Handbook factory planning and design

    CERN Document Server

    Wiendahl, Hans-Peter; Nyhuis, Peter

    2015-01-01

    This handbook introduces a methodical approach and pragmatic concept for the planning and design of changeable factories that act in strategic alliances to supply the ever-changing needs of the global market. In the first part, the change drivers of manufacturing enterprises and the resulting new challenges are considered in detail with focus on an appropriate change potential. The second part concerns the design of the production facilities and systems on the factory levels work place, section, building and site under functional, organisational, architectural and strategic aspects keeping in mind the environmental, health and safety aspects including corporate social responsibility. The third part is dedicated to the planning and design method that is based on a synergetic interaction of process and space. The accompanying project management of the planning and construction phase and the facility management for the effective utilization of the built premises close the book. -        Concise overview o...

  9. 23 CFR 652.11 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 652.11 Section 652.11 Highways FEDERAL HIGHWAY... ACCOMMODATIONS AND PROJECTS § 652.11 Planning. Federally aided bicycle and pedestrian projects implemented within... unless excluded by agreement between the State and the metropolitan planning organization. ...

  10. Quality plan for criticality safety calculations at Rocky Flats

    International Nuclear Information System (INIS)

    Pecora, D.

    1978-01-01

    The text of the plan is given, and some of the guidelines followed in writing it are discussed to aid others who may be faced with the same task. The plan is divided into four sections. The Introduction describes the general functions and purpose of the calculational program. The second section, Activities and Responsibilities, lists specific tasks and their purposes and assigns responsibility for performance. The third section references relevant documentation (e.g., ANSI standards), and the final section describes quality plans for specific functions

  11. 40 CFR 52.2299 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ..., 1987. Revisions to TACB Regulation VIII, 31 TAC Chapter 118, “Emergency Episode Planning,” as approved... for emissions emanating from Mexico. (i) Incorporation by reference. (A) Revisions to Texas Air... modeling techniques (e.g., Urban Airshed Model), future studies will attempt to better define the relative...

  12. Proceedings 2001. Networks. Section 3. Book 4

    International Nuclear Information System (INIS)

    Shukleva, Eva; Taleski, Rubin

    2001-01-01

    The holding of this Symposium was initiated by MAKO CIGRE - Macedonian Committee on Large High Voltage Systems, in compliance with its determination to raise competent discussions on current issues. The 3 sections of the conference were entitled: (1) power plants facilities, (2) power transmission lines, (3) networks. The forth volume includes the following topics: STK 36 - electromagnetic compatibility; STK 37 - planning and development of the power systems; STK 38 - power systems analysis and STK 39 - power systems control. Papers relevant to INIS are indexed separately

  13. A guide for preparing Hanford Site facility effluent monitoring plans

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1992-06-01

    This document provides guidance on the format and content of effluent monitoring plans for facilities at the Hanford Site. The guidance provided in this document is designed to ensure compliance with US Department of Energy (DOE) Orders 5400.1 (DOE 1988a), 5400.3 (DOE 1989a), 5400.4 (DOE 1989b), 5400.5 (DOE 1990a), 5480.1 (DOE 1982), 5480.11 (DOE 1988b), and 5484.1 (DOE 1981). These require environmental monitoring plans for each site, facility, or process that uses, generates, releases, or manages significant pollutants of radioactive or hazardous materials. In support of DOE Orders 5400.5 (Radiation Protection of the Public and the Environment) and 5400.1 (General Environmental Protection Program), the DOE Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE 1991) should be used to establish elements of a radiological effluent monitoring program in the Facility Effluent Monitoring Plan. Evaluation of facilities for compliance with the US Environmental Protection Agency Clean Air Act of 1977 requirements also is included in the airborne emissions section of the Facility Effluent Monitoring Plans. Sampling Analysis Plans for Liquid Effluents, as required by the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), also are included in the Facility Effluent Monitoring Plans. The Facility Effluent Monitoring Plans shall include complete documentation of gaseous and liquid effluent sampling and monitoring systems

  14. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  15. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  16. 25 CFR 700.93 - Relocation plan.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Relocation plan. 700.93 Section 700.93 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.93 Relocation plan. The relocation plan shall be the plan prepared...

  17. Hurricane Sandy science plan: impacts of storm surge, including disturbed estuarine and bay hydrology

    Science.gov (United States)

    Caskie, Sarah A.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: • Coastal topography and bathymetry • Impacts to coastal beaches and barriers

  18. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  19. Enhanced sludge washing evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices.

  20. Enhanced sludge washing evaluation plan

    International Nuclear Information System (INIS)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices

  1. 15 CFR 23.3 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Plan. 23.3 Section 23.3 Commerce and... MISSING CHILDREN § 23.3 Plan. (a) The Department of Commerce will supplement and expand the national... biannual meetings of departmental representatives to discuss the current plan and recommendations for...

  2. 7 CFR 631.9 - Conservation plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Conservation plan. 631.9 Section 631.9 Agriculture... plan. (a) An applicant is responsible for developing a conservation plan, in cooperation with the conservation district, that protects the resource base in a manner acceptable to NRCS. This plan will be used...

  3. 30 CFR 282.22 - Delineation Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Delineation Plan. 282.22 Section 282.22 Mineral... § 282.22 Delineation Plan. All exploration activities shall be conducted in accordance with a Delineation Plan submitted by the lessee and approved by the Director. The Delineation Plan shall describe the...

  4. 29 CFR 2510.3-3 - Employee benefit plan.

    Science.gov (United States)

    2010-07-01

    ... section clarifies the definition in section 3(3) of the term “employee benefit plan” for purposes of title... receive any benefit under the plan even if the contingency for which such benefit is provided should occur... 29 Labor 9 2010-07-01 2010-07-01 false Employee benefit plan. 2510.3-3 Section 2510.3-3 Labor...

  5. National plan for the accelerated commercialization of solar energy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    After a brief profile of the Mid-American region and characterization of the residential and commercial markets and the industry of the region, a short description is given of a regional planning meeting held for the purpose of preparing input for the Mid-American section of the National Program for the Accelerated Commercialization of Solar Energy (NPAC) Implementation plans. For each of thirty-eight programs, the objective, rationale, task statement/description, evaluation measures, and implementor are given. The programs are in these areas: public education/awareness; education/training; legislative/regulatory; performance/analysis; design/planning;demonstrations; state interface; technology; information dissemination; legal and regulatory; analysis and assessment; and regional coordination. Two policy statements are included - one on cratering a solar society and the other recommending the expansion of the commercialization to encompass and include the concepts of utilization and popularization in the plan for the advancement of solar energy. (LEW)

  6. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex

    International Nuclear Information System (INIS)

    2006-01-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted ''inactive'' status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on the

  7. 48 CFR 47.202 - Presolicitation planning.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Presolicitation planning. 47.202 Section 47.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT... Presolicitation planning. Contracting officers shall inform activities that plan to acquire transportation or...

  8. 26 CFR 1.414(l)-1 - Mergers and consolidations of plans or transfers of plan assets.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Mergers and consolidations of plans or transfers... Plans, Etc. § 1.414(l)-1 Mergers and consolidations of plans or transfers of plan assets. (a) In general... qualified under section 403 (a) and 405 (a), unless, in the case of a merger or consolidation (as defined in...

  9. 29 CFR 2510.3-102 - Definition of “plan assets”-participant contributions.

    Science.gov (United States)

    2010-07-01

    ... in cash. (c) Maximum time period for welfare benefit plans. With respect to an employee welfare...) of this section shall apply to such plan as if such plan were an employee welfare benefit plan. (i...) of this section shall apply to such plan as if such plan were an employee welfare benefit plan. [61...

  10. 45 CFR 1355.35 - Program improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program improvement plans. 1355.35 Section 1355.35... plans. (a) Mandatory program improvement plan. (1) States found not to be operating in substantial conformity shall develop a program improvement plan. The program improvement plan must: (i) Be developed...

  11. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  12. 23 CFR 1200.25 - Improvement plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Improvement plan. 1200.25 Section 1200.25 Highways... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...

  13. 45 CFR 1176.5 - Annual plan.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Annual plan. 1176.5 Section 1176.5 Public Welfare... ENDOWMENT FOR THE HUMANITIES PART-TIME CAREER EMPLOYMENT § 1176.5 Annual plan. (a) An agencywide plan for promoting part-time employment opportunities will be developed annually. This plan will establish annual...

  14. 7 CFR 633.9 - Conservation plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Conservation plan. 633.9 Section 633.9 Agriculture... AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.9 Conservation plan. (a) The program participant... conservation plan for the acreage designated under an agreement. (b) The conservation plan is the basis for the...

  15. 30 CFR 282.24 - Mining Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Mining Plan. 282.24 Section 282.24 Mineral... § 282.24 Mining Plan. All OCS mineral development and production activities shall be conducted in accordance with a Mining Plan submitted by the lessee and approved by the Director. A Mining Plan shall...

  16. Status of standard cross section library and future plan

    International Nuclear Information System (INIS)

    Zukeran, Atsushi

    2001-01-01

    JSSTDL-300 multi-group cross section library with 300 neutron energy groups coupled with 104 group γ-ray cross sections was developed for general users in nuclear reactor physics and/or design, whose source data is the evaluated nuclear data library JENDL-3.2. For the purpose of a standard or common use, several famous cross section libraries worldwide used, i.e., ABBN-25, GAM-123, VITAMIN-C/J(E+C), MGCL-137, BERMUDA-12 and FNS-125 for neutron, and LANL-12, -24-, -48, and CSEWG-94 for γ-ray, are consulted about setting the common energy group structure. Furthermore, in order to expand the applicability, the top energy is set on 20 MeV and the lowest energy is 10 -5 eV. In the thermal neutron energy region, the JSSTDL-300 has about 20 energy groups. Besides, many utility codes for group collapsing and for data format transformation are provided for general users. (author)

  17. 40 CFR 52.1477 - Nevada air pollution emergency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Nevada air pollution emergency plan. 52.1477 Section 52.1477 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1477 Nevada air pollution emergency plan. Section 6.1.5 of...

  18. 29 CFR 1952.160 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... include both occupational safety and occupational health, the latter on a developmental basis. The plan defines the covered occupational safety and health issues as defined by the Secretary of Labor in 29 CFR... Section 1952.160 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH...

  19. 12 CFR 228.27 - Strategic plan.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Strategic plan. 228.27 Section 228.27 Banks and... REINVESTMENT (REGULATION BB) Standards for Assessing Performance § 228.27 Strategic plan. (a) Alternative...(s) under a strategic plan if: (1) The bank has submitted the plan to the Board as provided for in...

  20. 23 CFR 1335.6 - Strategic plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Strategic plan. 1335.6 Section 1335.6 Highways NATIONAL... § 1335.6 Strategic plan. A strategic plan shall— (a) Be a multi-year plan that identifies and prioritizes... performance-based measures by which progress toward those goals will be determined; and (c) Be submitted to...

  1. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  2. 48 CFR 873.105 - Acquisition planning.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Acquisition planning. 873.105 Section 873.105 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS DEPARTMENT... planning. (a) Acquisition planning is an indispensable component of the total acquisition process. (b) For...

  3. 14 CFR 26.49 - Compliance plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Compliance plan. 26.49 Section 26.49... Data for Repairs and Alterations § 26.49 Compliance plan. (a) Compliance plan. Except for applicants... January 11, 2008, each person identified in §§ 26.43, 26.45, and 26.47, must submit a compliance plan...

  4. 15 CFR 930.73 - OCS plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false OCS plan. 930.73 Section 930.73...) Exploration, Development and Production Activities § 930.73 OCS plan. (a) The term “OCS plan” means any plan... described in detail in OCS plans approved by the Secretary of the Interior or designee prior to management...

  5. 47 CFR 90.1211 - Regional plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Regional plan. 90.1211 Section 90.1211... § 90.1211 Regional plan. (a) To facilitate the shared use of the 4.9 GHz band, each region may submit a plan on guidelines to be used for sharing the spectrum within the region. Any such plan must be...

  6. 46 CFR 122.503 - Voyage plan.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Voyage plan. 122.503 Section 122.503 Shipping COAST... Emergencies § 122.503 Voyage plan. (a) The master of the following vessels shall prepare a voyage plan: (1) A... United States Great Lakes port from a Canadian Great Lakes port. (b) The voyage plan required by...

  7. LBNL Institutional Plan, FY 1996--2001. Draft

    International Nuclear Information System (INIS)

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy's strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory's scientific and support divisions

  8. LBNL Institutional Plan, FY 1996--2001. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  9. SAVY-4000 Field Surveillance Plan Update for 2017

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Elizabeth J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stone, Timothy Amos [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Smith, Paul Herrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Reeves, Kirk Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Veirs, Douglas Kirk [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Prochnow, David Adrian [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-20

    The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-­1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.”This 2017 update reflects changes to the surveillance plan resulting from surveillance findings as documented in Reeves et al. 2016. These findings include observations of corrosion in SAVY and Hagan containers and the indication (in one SAVY container) of possible filter membrane thermal degradation. This surveillance plan update documents the rationale for selecting surveillance containers, specifies the containers for 2017 surveillance, and identifies a minimum set of containers for 2018 surveillance. This update contains important changes to the previous surveillance plans.

  10. 40 CFR 52.2921 - Original identification of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52.2921 Section 52.2921 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Mariana Islands § 52.2921 Original identification of plan. (a) This section identified the original...

  11. 42 CFR 441.20 - Family planning services.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Family planning services. 441.20 Section 441.20... General Provisions § 441.20 Family planning services. For recipients eligible under the plan for family... free to choose the method of family planning to be used. ...

  12. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts

  13. Emergency Planning and Community Right-To-Know Act. Section 312 Tier Two report forms

    Energy Technology Data Exchange (ETDEWEB)

    Evans, R.A.; Martin, K.J.

    1997-02-01

    As required by Right-to-Know Laws and Pollution Prevention Requirements, the Y-12 Plant staff is submitting an unclassified version of the Tier-Two Forms. This report contains data for CY 1996 for all hazardous chemicals stored at the Y-12 Plant in quantities equal to or greater than 10,000 pounds and all extremely hazardous substances stored in quantities equal to or greater than 500 pounds or the threshold planning quantity, whichever is lower. Also included with this submittal is a key to the inventory, temperature, pressure, and container codes used on the report forms. This information is included to aid in the interpretation of the data presented. It is not necessary that the code information be forwarded to the referenced state and local agencies. Classified information supporting this document will be maintained on file for review by Q-cleared personnel.

  14. Emergency Planning and Community Right-To-Know Act. Section 312 Tier Two report forms

    International Nuclear Information System (INIS)

    Evans, R.A.

    1998-02-01

    As required by Right-to-Know Laws and Pollution Prevention Requirements, the Y-12 Plant staff is submitting an unclassified version of the Tier-Two Forms. This report contains data for CY 1997 for all hazardous chemicals stored at the Y-12 Plant in quantities equal to or greater than 10,000 pounds and all extremely hazardous substances stored in quantities equal to or greater than 500 pounds or the threshold planning quantity, whichever is lower. Also included with this submittal is a key to the inventory, temperature, pressure, and container codes used on the report forms. This information is included to aid in the interpretation of the data presented. It is not necessary that the code information be forwarded to the referenced state and local agencies. Classified information supporting this document will be maintained on file for review by Q-cleared personnel

  15. 7 CFR 275.16 - Corrective action planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...

  16. Corporate plan 1994/95 to 1998/99

    International Nuclear Information System (INIS)

    1994-04-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970. As with all non-departmental public bodies it is required to prepare a Corporate Plan against which its performance and the relevance of its activities to contemporary requirements can be measured. The Board has produced annual Corporate Plans since 1986. In this issue, summary sections on background, objectives, and finances are followed by fifteen sections describing the major areas of work in a structured manner with the Plan objectives, achievements, and alterations set out. Altogether, the Plan shows a good level of attainment and a clear sense of direction. (author)

  17. 14 CFR 431.41 - Communications plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Communications plan. 431.41 Section 431.41... Launch and Reentry of a Reusable Launch Vehicle § 431.41 Communications plan. (a) An applicant shall submit a plan providing vehicle safety operations personnel communications procedures during the mission...

  18. 40 CFR 35.9020 - Planning targets.

    Science.gov (United States)

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Financial Assistance for the National Estuary Program § 35.9020 Planning targets. The EPA Assistant Administrator for Water develops planning targets each year to help each... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Planning targets. 35.9020 Section 35...

  19. 12 CFR 609.935 - Business planning.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Business planning. 609.935 Section 609.935 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM ELECTRONIC COMMERCE Standards for Boards and Management § 609.935 Business planning. When engaging in E-commerce, the business plan required...

  20. 12 CFR 702.306 - Revised business plans for new credit unions.

    Science.gov (United States)

    2010-01-01

    ... exposure to risk (including credit risk, interest-rate risk, and other types of risk). (d) Consideration of... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Revised business plans for new credit unions. 702.306 Section 702.306 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING...

  1. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  2. 40 CFR 130.5 - Continuing planning process.

    Science.gov (United States)

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall establish and maintain a continuing planning process (CPP) as described under section 303(e)(3)(A)-(H) of... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Continuing planning process. 130.5...

  3. 49 CFR 234.201 - Location of plans.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Location of plans. 234.201 Section 234.201..., Inspection, and Testing Maintenance Standards § 234.201 Location of plans. Plans required for proper maintenance and testing shall be kept at each highway-rail grade crossing warning system location. Plans shall...

  4. 20 CFR 628.420 - Job training plan.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  5. 10 CFR 420.13 - Annual State applications and amendments to State plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Annual State applications and amendments to State plans. 420.13 Section 420.13 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula..., renewable energy, and alternative transportation fuel goals to be achieved, including wherever practicable...

  6. Information And Data-Sharing Plan of IPY China Activity

    Science.gov (United States)

    Zhang, X.; Cheng, W.

    2007-12-01

    expeditions on the site of IPY Chinese Programme. Meanwhile, focusing on areas in east Antarctic Dome A-Grove Mountain-Zhongshan Station-Amery Ice Shelf-Prydz Bay Section and the fan areas of Pacific Ocean in the Arctic Ocean, the Plan will also collect and integrate IPY data and historical data and establish database of PANDA Section and the Arctic Ocean. The details are as follows: On the basis of integrating the observed data acquired during the expeditions of China, the Plan will, adopting portal technology, develop 5 subject databases (English version included):(1) Database of Zhongshan Station- Dome A inner land ice cap section;(2) Database of interaction of ocean-ice-atmosphere-ice shelf in east Antarctica;(3) Database of geological and glaciological advance and retreat evolvement in Grove Mountains; (4) Database of Solar Terrestrial Physics at Zhongshan Station; (5) Oceanographic database of fan area of Pacific Ocean in the Arctic Ocean. CN-NADC of PRIC is the institute which assumes the responsibility for the Plan, specifically, it coordinates and organizes the operation of the Plan which includes data management, developing the portal of data and information sharing, and international exchanges. The specific assignments under the Plan will be carried out by research institutes under CAS (Chinese Academy of Sciences), SOA ( State Oceanic Administration), State Bureau of Surveying and Mapping and Ministry of Education.

  7. 49 CFR 37.139 - Plan contents.

    Science.gov (United States)

    2010-10-01

    ..., absence of restrictions or priorities based on trip purpose, response time, fares, hours and days of... 49 Transportation 1 2010-10-01 2010-10-01 false Plan contents. 37.139 Section 37.139... DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.139 Plan contents. Each plan shall...

  8. 7 CFR 632.21 - Reclamation plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Reclamation plan. 632.21 Section 632.21 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Participation § 632.21 Reclamation plan. (a) Responsibility. Land users are responsible for developing a reclamation plan that will serve as a basis for a...

  9. 20 CFR 632.255 - Program planning.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described in...

  10. Timing of elective repeated cesarean delivery in patients with previous two or more cesarean section.

    Science.gov (United States)

    Mohammed, Abdel-Baset F; Bayo, Arabo I; Abu-Jubara, Mahmoud F

    2013-01-01

    To assess the maternal and neonatal consequences of scheduling elective repeated cesarean section (ERCS) at 39 weeks rather than 38 weeks and to assess the impacts of delivering by emergency cesarean section (CS) before the planned date. Retrospective Cohort study. Patients with previous two or more CS planned for ERCS at term during the period from January to June 2011. Medical records were reviewed for demographic and clinical data, planned timing of CS, emergency cesarean and any adverse maternal or neonatal outcome. Adverse maternal or neonatal outcome. Four hundred and twenty women were included, 71.4% of cases were posted <39 weeks and 28.6% were posted at ≥39 weeks. Patients posted ≥ 39 weeks were more prone to deliver by emergency CS (16.6 vs. 10.6%) and the neonates were less prone to RDS and NICU admission (p < 0.05). Our data support the justification to book patients for ERCS at ≥39 weeks.

  11. Slender body theory programmed for bodies with arbitrary cross section. [including fuselages

    Science.gov (United States)

    Werner, J.; Krenkel, A. R.

    1978-01-01

    A computer program developed for determining the subsonic pressure, force, and moment coefficients for a fuselage-type body using slender body theory is described. The program is suitable for determining the angle of attack and sideslipping characteristics of such bodies in the linear range where viscous effects are not predominant. Procedures developed which are capable of treating cross sections with corners or regions of large curvature are outlined.

  12. Planned home versus planned hospital births in women at low-risk pregnancy: A systematic review with meta-analysis.

    Science.gov (United States)

    Rossi, A Cristina; Prefumo, Federico

    2018-03-01

    New interest in home birth have recently arisen in women at low risk pregnancy. Maternal and neonatal morbidity of women planning delivery at home has yet to be comprehensively quantified. We aimed to quantify pregnancy outcomes following planned home (PHB) versus planned hospital birth (PHos). We did a systematic review of maternal and neonatal morbidity following planned home (PHB) versus planned hospital birth (PHos). We included prospective, retrospective, cohort and case-control studies of low risk pregnancy outcomes according to planning place of birth, identified from January 2000 to June 2017. We excluded studies in which high-risk pregnancy and composite morbidity were included. Outcomes of interest were: maternal and neonatal morbidity/mortality, medical interventions, and delivery mode. We pooled estimates of the association between outcomes and planning place of birth using meta-analyses. The study protocol is registered with PROSPERO, protocol number CRD42017058016. We included 8 studies of the 4294 records identified, consisting in 14,637 (32.6%) in PHB and 30,177 (67.4%) in PHos group. Spontaneous delivery was significantly higher in PHB than PHos group (OR: 2.075; 95%CI:1.654-2.063) group. Women in PHB group were less likely to undergo cesarean section compared with women in PHos (OR:0.607; 95%CI:0.553-0.667) group. PHB group was less likely to receive medical interventions than PHos group. The risk of fetal dystocia was lower in PHB than PHos group (OR:0.287; 95%CI:0.133-0.618). The risk of post-partum hemorrhage was lower in PHB than PHos group (OR:0.692; 95% CI.0.634-0.755). The two groups were similar with regard to neonatal morbidity and mortality. Births assisted at hospital are more likely to receive medical interventions, fetal monitoring and prompt delivery in case of obstetrical complications. Further studies are needed in order to clarify whether home births are as safe as hospital births. Copyright © 2018 Elsevier B.V. All rights

  13. The Importance of Documenting and Including Traditional Wisdom in Community-Based Ecotourism Planning

    Directory of Open Access Journals (Sweden)

    Vesna Đukić

    2017-01-01

    Full Text Available This article accords to the theory of community-based tourism, which represents a concept that respects natural and cultural resources of a particular community and encourages participation of its members in the process of tourist product creation. The article operates in the planning phase and aims to give insights into the process of establishing the groundwork for community-based tourism. The key element is documenting and illustrating everything that could be a part of what is known as “traditional wisdom,” namely, the skills and knowledge of traditional life practices. The methods of case study, content analysis, and observation of the village of Omoljica, Serbia, were used. The positive aspect of this locality is reflected in the existing short-term initiatives of organizations and individuals engaging in preserving traditional practices, but without systematic, long-term planning and management of community-based tourism, these individual efforts to revalue traditional life practices would stay unrecognizable and invisible for visitors and stakeholders. Thus, the main goal of this article is to understand the relation between short-term bottom-up initiatives and long-term top-down strategic planning of specific ecotourism destinations, one that would embrace the traditional ways of rural community life. The contribution of this study, in addition to documenting and illustrating “traditional wisdom” of the specific rural community placed in the protected area which encompasses a particular local social system, will be reflected in the creation of a set of guidelines for sustainable, rural, community-based ecotourism as a soft-driver development of protected areas near big cities of the postsocialist countries.

  14. 14 CFR 259.5 - Customer service plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Customer service plan. 259.5 Section 259.5... REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.5 Customer service plan. (a) Adoption of Plan. Each covered carrier shall adopt a Customer Service Plan applicable to its scheduled flights and shall...

  15. 40 CFR 300.205 - Planning and coordination structure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Planning and coordination structure. 300.205 Section 300.205 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a...

  16. 28 CFR 2.83 - Release planning.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Release planning. 2.83 Section 2.83... Release planning. (a) All grants of parole shall be conditioned on the development of a suitable release... parole date for purposes of release planning for up to 120 days without a hearing. If efforts to...

  17. 10 CFR 76.91 - Emergency planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Emergency planning. 76.91 Section 76.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.91 Emergency planning... Emergency Planning and Community Right-to-Know Act of 1986, Title III, Public Law 99-499, or other State or...

  18. Married women's decision making power on family planning use and associated factors in Mizan-Aman, South Ethiopia: a cross sectional study.

    Science.gov (United States)

    Belay, Abeba Daniel; Mengesha, Zelalem Birhanu; Woldegebriel, Manay Kifle; Gelaw, Yalemzewod Assefa

    2016-03-08

    Women's use of family planning service is influenced by many factors, especially by their decision making power. A woman's decision-making power, be it individual or decision made in collaboration with a partner, is the most important factor in the use of family planning in a household. The purpose of this study was to assess the impact of women's decision making power on family planning use and its associated factors. A community-based cross-sectional study was conducted on married women in the child bearing age. The women who were living in Mizan city were selected using the simple random sampling method. Trained nurses collected the data by interview, using a structured and pre-tested questioner. Bivariable and multivariable binary logistic regression analysis was used to identify the associated factors, and the odds ratio with a 95% CI was computed to assess the strength of the association. Collinearity was also assessed by looking at standard errors in the final fitted model. Overall, more than two-thirds [67.2%: 95% CI (63-71%)] of the married women were found to be more autonomous to decide family planning use. Secondary education [AOR: 9.04, 95% CI: (4.50, 18.16)], government employment [AOR: 4.84, 95% CI: (2.03, 11.52)], being wives of government employed spouses [AOR 2.71, 95% CI: (1.24, 7.97)], having husbands with college or university education [AOR: 11.29, 95% CI: (4.66, 27.35)], and being in the younger age [AOR: 0.27, 95% CI :(0.09, 0.75)] were significantly associated with women's decision-making power on family planning. In this study, women had a high decision making power in family planning use. Age category (34-44-years), formal education, and occupational status had effects on women's decision making power. Promoting parental adult education and engaging women in out of house employment is essential to improve their decision making power in using family planning.

  19. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  20. 32 CFR 536.19 - Disaster claims planning.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Disaster claims planning. 536.19 Section 536.19... AGAINST THE UNITED STATES The Army Claims System § 536.19 Disaster claims planning. All ACOs will prepare... requirements related to disaster claims planning. ...

  1. River Protection Project (RPP) Immobilized High-Level Waste (HLW) Interim Storage Plan

    International Nuclear Information System (INIS)

    BRIGGS, M.G.

    2000-01-01

    This document replaces HNF-1751, Revision 1. It incorporates updates to reflect changes in programmatic direction associated with the vitrification plant contract and associated DOE-ORP guidance. In addition it includes planning associated with failed/used melter and sample handling and disposition work scope. The document also includes format modifications and section numbering update consistent with CH2M HILL Hanford Group, Inc. procedures

  2. 33 CFR 385.32 - Comprehensive Plan Modification Report

    Science.gov (United States)

    2010-07-01

    ... Implementation Reports. It is not the intent of this section to require a continual cycle of report writing for... Report 385.32 Section 385.32 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY... Incorporating New Information Into the Plan § 385.32 Comprehensive Plan Modification Report Whenever the Corps...

  3. Determinants of unmet need for family planning among currently married women in Dangila town administration, Awi Zone, Amhara regional state; a cross sectional study.

    Science.gov (United States)

    Genet, Ewnetu; Abeje, Gedefaw; Ejigu, Tadese

    2015-05-13

    Unmet need for family planning is a major problem of developing countries. Evidences about unmet need for family planning and associated factors are not enough in Dangila town. Therefore, this study was done to assess the magnitude and determinants of unmet need for family planning among currently married women in Dangila town. Community based cross sectional study design was used to collect data from a total of 551 currently married women from February to March 2014. Data were collected using pretested structured interviewer administered questionnaire after written consent was obtained from respondents. Collected data were edited, coded, and entered to SPSS version 16.0. Bivariate and multivariable logistic regression analyses were done to identify determinants of unmet need for family planning. This study revealed that 17.4 % of married women had unmet need for family planning. In this study, women who were housewife/farmers were about 7 [OR = 6.81 (1.91-24.29)] times more likely to have unmet need compared to employed women. Women who were not counseled about family planning by health workers [OR = 6.76 (3.17-14.42)], women whose partner had non-supportive attitude for family planning use [OR = 3.34 (1.26-8.90)] and rural women [OR = 17.65 (4.35-71.67)] were also more likely to have unmet need for family planning. About 33 %, 32 %, 23.5 % and 11.8 % of women mentioned less perceived risk of pregnancy due to breast feeding, fear of side effects, partner opposition and religious prohibition respectively as reasons for not using contraceptives at the time of interview. The level of unmet need for family planning in the study area is still high compared to the target set (10 %) in the national family planning guide plan of Ethiopia to be achieved by the end of 2015. Therefore, it is important to strengthen counseling and partner involvement in Dangila town to reduce unmet need for family planning.

  4. 24 CFR 901.145 - Improvement Plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Improvement Plan. 901.145 Section... PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM § 901.145 Improvement Plan. (a) After receipt of the State... a PHA, or a RMC through the PHA, to prepare and submit to the State/Area Office an Improvement Plan...

  5. 40 CFR 279.55 - Analysis plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Analysis plan. 279.55 Section 279.55... THE MANAGEMENT OF USED OIL Standards for Used Oil Processors and Re-Refiners § 279.55 Analysis plan... analysis plan describing the procedures that will be used to comply with the analysis requirements of § 279...

  6. 45 CFR 400.118 - Case planning.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Case planning. 400.118 Section 400.118 Public... Services § 400.118 Case planning. (a) A State, or its designee under § 400.117, must develop and implement... services. (b) Case planning for unaccompanied minors must, at a minimum, address the following elements: (1...

  7. 13 CFR 313.6 - Strategic Plans.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Strategic Plans. 313.6 Section 313... § 313.6 Strategic Plans. (a) General. An Impacted Community that intends to apply for a grant for implementation assistance under § 313.7 shall develop and submit a Strategic Plan to EDA for evaluation and...

  8. 45 CFR 98.14 - Plan process.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Plan process. 98.14 Section 98.14 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17...

  9. Special section: religion and territorial politics in southern Europe

    OpenAIRE

    Giorgi , Alberta; Itçaina , Xabier

    2016-01-01

    International audience; The invisible politics of religion in southern European territories: preliminary considerations With this issue of Religion, State & Society, we inaugurate a planned series of special sections focusing on the analysis of the political involvement of religious associations and organisations at the local level. Without pre-empting the more substantial conclusion that we plan for the last of the special sections, in this short introduction we aim to state brieflythe main ...

  10. 42 CFR 410.100 - Included services.

    Science.gov (United States)

    2010-10-01

    ... service; however, maintenance therapy itself is not covered as part of these services. (c) Occupational... increase respiratory function, such as graded activity services; these services include physiologic... rehabilitation plan of treatment, including physical therapy services, occupational therapy services, speech...

  11. 29 CFR 2520.104-20 - Limited exemption for certain small welfare plans.

    Science.gov (United States)

    2010-07-01

    ... authority of section 104(a)(3) of the Act, the administrator of any employee welfare benefit plan which... from employee benefit plans for research and analysis (section 513). (d) Examples. (1) A welfare plan... 29 Labor 9 2010-07-01 2010-07-01 false Limited exemption for certain small welfare plans. 2520.104...

  12. 12 CFR 563e.27 - Strategic plan.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Strategic plan. 563e.27 Section 563e.27 Banks... for Assessing Performance § 563e.27 Strategic plan. (a) Alternative election. The OTS will assess a... strategic plan if: (1) The savings association has submitted the plan to the OTS as provided for in this...

  13. Acceptance inspection plan 105KE Facility modifications for fuel retrieval subproject

    International Nuclear Information System (INIS)

    Shen, E.J.

    1998-01-01

    The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified, to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms)

  14. Acceptance inspection plan 105KW Facility modifications for fuel retrieval subproject

    International Nuclear Information System (INIS)

    Shen, E.J.

    1998-01-01

    The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of.work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms)

  15. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  16. NRPB corporate plan

    International Nuclear Information System (INIS)

    Clarke, Roger

    1995-01-01

    As with all non-departmental public bodies, the National Radiological Protection Board is required to prepare a Corporate Plan each year. The Plan for 1995/1996 to 1999/2000 is now available as a Board report; extracts from the introductory section are given here. They deal with the Board's statutory duty to provide advice and conduct research and with its power to provide services, all in relation to ionising and non-ionising radiations. (author)

  17. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  18. 40 CFR 62.9611 - Identification of plan-Pennsylvania.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Identification of plan-Pennsylvania. 62... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Pennsylvania...—Pennsylvania. (a) Title of Plan. Commonwealth of Pennsylvania Plan under section 111(d) for Designated...

  19. 7 CFR 1948.80 - Planning grant selection criteria.

    Science.gov (United States)

    2010-01-01

    ... financial resources available for such planning; (d) The planning priorities and recommended funding level... 7 Agriculture 13 2010-01-01 2009-01-01 true Planning grant selection criteria. 1948.80 Section... Development Assistance Program § 1948.80 Planning grant selection criteria. The following criteria will be...

  20. 40 CFR 52.2823 - Original identification of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) American Samoa § 52.2823 Original identification of plan. (a) This section identified the original “Implementation Plan for Compliance With the...

  1. 40 CFR 52.2673 - Original identification of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Guam § 52.2673 Original identification of plan. (a) This section identified the original “Implementation Plan for Compliance With the...

  2. 76 FR 20853 - Approval and Promulgation of Air Quality Implementation Plans; Kentucky; Approval of Section 110...

    Science.gov (United States)

    2011-04-14

    ... include contingency measures. On December 22, 2006, the United States Court of Appeals for the District of... Commenters' view that Kentucky's Prevention of Significant Deterioration (PSD) program does not require new... CAA section 110(a)(1). The Courts have agreed with EPA's longstanding view that a maintenance...

  3. Comparison of different application systems and CT- assisted treatment planning procedures in primary endometrium cancer: Is it technically possible to include the whole uterus volume in the volume treated by brachytherapy

    International Nuclear Information System (INIS)

    Mock, U.; Knocke, Th.; Fellner, C.; Poetter, R.

    1996-01-01

    Purpose: Brachytherapy is regarded as the definitive component of treatment for inoperable patients with endometrium cancer. In published series the whole uterus has been claimed to represent the target volume independently of the individual tumor spread. The purpose of this work is to compare different planning and application procedures and to analyze the target volumes (whole uterus), treatment volumes and their respective relation for the given various conditions. Material and Methods: In ten patients with primary endometrium cancer the correlation between target- and treatment volume was analysed based on standard one-channel applicators or individual Heyman applicators. A comparative analysis of target volumes resulting from two different planning procedures of Heyman applications was performed. CT was carried out after insertion of the Heyman ovoids. Target volume was estimated by measuring the uterus size at different cross sections of the CT images. Dose calculation was performed with (PLATO-system) or without (NPS-system) transferring these data directly to the planning system. We report on the differences in treatment volumes resulting from the two application and planning systems. Results: The mean value of the uterus volume was 180 ccm (range 57 ccm to 316 ccm). Four out of 10 patients had an asymmetric uterus configuration with a side-difference (in longitudinal or transversal direction) of more than 1 cm. On average 70% (range 48-95%) of the uterus volume was included by the treatment volume when Heymann applicators were used compared to 45 % (range 25-89%) when standard one channel applicators were used. This represents an improvement of 25% (range from 11%-35%). By utilizing the more sophisticated way of treatment planning a more adequate coverage of the uterus volume was achieved in five out of ten patients. The treated volume increased on the average by 20 % (range 11 %-32%). In three cases changes in the irradiation volume were less than 5%. In

  4. Improving in organization of in-site planning for NPP

    International Nuclear Information System (INIS)

    Gitel'man, L.D.; Khanin, V.V.; Trunov, V.M.; Khanin, R.V.

    1986-01-01

    The organization of NPP section activity planning is considered. With regard to the structure of in-site plans by time and content, their distribution in organization control structure, order of plan development, stimulation, accounting and estimation of plan fulfillment, plan indices for each shop and plan-assignment form are developed

  5. Exploring the Theory of Planned Behavior to Explain Sugar-Sweetened Beverage Consumption

    Science.gov (United States)

    Zoellner, Jamie; Estabrooks, Paul A.; Davy, Brenda M.; Chen, Yi-Chun; You, Wen

    2012-01-01

    Objective: To describe sugar-sweetened beverage (SSB) consumption and to establish psychometric properties and utility of a Theory of Planned Behavior (TPB) instrument for SSB consumption. Methods: This cross-sectional survey included 119 southwest Virginia participants. Most of the respondents were female (66%), white (89%), and had at least a…

  6. 20 CFR 669.520 - What information is required in the NFJP grant plans?

    Science.gov (United States)

    2010-04-01

    ... grant plans? 669.520 Section 669.520 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR NATIONAL FARMWORKER JOBS PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT..., including the specific goals of the grantee's program for the two Program Years involved; (e) The method the...

  7. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-09-30

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure 1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 which provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater sampling (Section 3.0), whereas well granted ''inactive'' status are not used for either purpose. The status designation also determines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 4.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 5.0). This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within three hydrogeologic regimes (Figure 1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the

  8. Nursing home manager's knowledge, attitudes and beliefs about advance care planning for people with dementia in long-term care settings: a cross-sectional survey.

    Science.gov (United States)

    Beck, Esther-Ruth; McIlfatrick, Sonja; Hasson, Felicity; Leavey, Gerry

    2017-09-01

    To examine nursing home managers' knowledge, attitudes, beliefs and current practice regarding advance care planning for people with dementia in long-term care settings informed by the theory of planned behaviour. Internationally, advance care planning is advocated for people with dementia. However, evidence suggests that discussions with people with dementia are rare, particularly in long-term care settings. Whilst nursing home managers can be considered central to implementation in this setting, there is a dearth of research that has examined their perspective. This study reports on their role with regard to advance care planning and the perceived factors which influence this. A cross-sectional postal survey was carried out as part of a larger scale sequential explanatory mixed-methods study between January-March 2015. Nursing home managers in a region in the UK (n = 178). A response rate of 66% (n = 116) was achieved. Nursing home managers demonstrated a lack of knowledge of advance care planning, with negative attitudes underpinned by concerns regarding the capacity and lack of perceived benefits to the person with dementia. Currently, they do not view advance care planning as part of their role, with lack of ownership impacting upon current practice behaviours. Whilst nursing home managers recognise the potential benefits of advance care planning, barriers and challenges create a reluctance to facilitate. Targeted training to address the knowledge deficit is required, with the wider components of advance care planning promoted. There is a need for greater role clarification to ensure nurses in long-term care settings identify with the process in the future. A gap between rhetoric and reality of implementation is evident; therefore, long-term care settings must critically examine system, organisational and individual factors for failure to implement advance care planning for people with dementia. Increased cognisance of the context in which advance care

  9. 40 CFR 52.2565 - Original identification of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) West Virginia § 52.2565 Original identification of plan. (a) This section identifies the original “Air Implementation Plan for the State of West...

  10. 40 CFR 52.622 - Original identification of plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan. 52.622... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.622 Original identification of plan. (a) This section identified the original “State of Hawaii Air Pollution Control Implementation Plan...

  11. Certification Plan, Radioactive Mixed Waste Hazardous Waste Handling Facility

    International Nuclear Information System (INIS)

    Albert, R.

    1992-01-01

    The purpose of this plan is to describe the organization and methodology for the certification of radioactive mixed waste (RMW) handled in the Hazardous Waste Handling Facility at Lawrence Berkeley Laboratory (LBL). RMW is low-level radioactive waste (LLW) or transuranic (TRU) waste that is co-contaminated with dangerous waste as defined in the Westinghouse Hanford Company (WHC) Solid Waste Acceptance Criteria (WAC) and the Washington State Dangerous Waste Regulations, 173-303-040 (18). This waste is to be transferred to the Hanford Site Central Waste Complex and Burial Grounds in Hanford, Washington. This plan incorporates the applicable elements of waste reduction, which include both up-front minimization and end-product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; an executive summary of the Waste Management Quality Assurance Implementing Management Plan (QAIMP) for the HWHF (Section 4); and a list of the current and planned implementing procedures used in waste certification

  12. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  13. 40 CFR 35.925-1 - Facilities planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...

  14. Coordinated CSN-UNESA research plan (PCI)

    International Nuclear Information System (INIS)

    Incinillas, J.

    2001-01-01

    This article contains a description of the essence and current status of the Coordinated Research Plan (PCI), beginning with details on the general specifications of the Framework Agreement signed by CSN and UNESA in September 1997, with an initial duration of four years and extendable on a yearly basis. The section on PCI Management describes the governing bodies, the mechanisms for including a project, tracking of projects underway, and the mechanisms for concluding projects. The Plan's generic goals are to acquire and increase technological skills and tools to guarantee operation of the nuclear park, take advantage of the synergies of the plants as a whole, and optimize the regulatory framework from the standpoint of safety and efficiency. In addition, strategic targets concerning efficiency, technological development and environment are defined. The current project status, overall budget and project completed to data are described. (Author)

  15. Security planning an applied approach

    CERN Document Server

    Lincke, Susan

    2015-01-01

    This book guides readers through building an IT security plan. Offering a template, it helps readers to prioritize risks, conform to regulation, plan their defense and secure proprietary/confidential information. The process is documented in the supplemental online security workbook. Security Planning is designed for the busy IT practitioner, who does not have time to become a security expert, but needs a security plan now. It also serves to educate the reader of a broader set of concepts related to the security environment through the Introductory Concepts and Advanced sections. The book serv

  16. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Science.gov (United States)

    2010-10-01

    ... planning. 5152.208-9001 Section 5152.208-9001 Federal Acquisition Regulations System DEPARTMENT OF THE ARMY... planning. As prescribed at 5108-070(g)(4) insert the following clause in full text in contracts where the contractor is designated a Limited Fee Planned Producer. Industrial Preparedness Planning (XXX 1989) (DEV) (a...

  17. 49 CFR 659.23 - System security plan: contents.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system security...

  18. 29 CFR 2520.104-4 - Alternative method of compliance for certain successor pension plans.

    Science.gov (United States)

    2010-07-01

    ... pension plans. 2520.104-4 Section 2520.104-4 Labor Regulations Relating to Labor (Continued) EMPLOYEE... certain successor pension plans. (a) General. Under the authority of section 110 of the Act, this section sets forth an alternative method of compliance for certain successor pension plans in which some...

  19. Section XI -- 25 years of development

    International Nuclear Information System (INIS)

    Hedden, O.F.

    1996-01-01

    The original concept of nuclear power plant designers was that the higher standards of design and fabrication would make inservice inspections unnecessary, and little attention was given to provisions for access. By 1966 the Atomic Energy Commission recognized that a planned program of periodic inservice inspections would be needed. They began development of criteria, and encouraged industry code-writing organizations to do likewise. These groups joined forces in 1968, and their product was published by ASME in 1970 as part of the Boiler and Pressure Code, Section XI, Rules for Inservice Inspection of Nuclear Reactor Coolant Systems. Section XI, 24 pages in 1970, is now 723 pages. While it originally covered only light water reactor Class 1 components and piping, it now includes Class 2, 3, and containment, and liquid metal cooled reactor plants. Along the way, rules have been developed for gas-cooled and low pressure heavy water reactor plants. The growth in size of Section XI from its modest beginning has been largely because of recognition that the rules governing plant inspection/operation need to be considerably different from the rules provided for the component designer/manufacturer. Rules have been developed in the areas of repair/replacement technology, NDE methodology, NDE acceptance standards, and analytical evaluation methods in the absence of appropriate rules in Section III

  20. EDDIX--a database of ionisation double differential cross sections.

    Science.gov (United States)

    MacGibbon, J H; Emerson, S; Liamsuwan, T; Nikjoo, H

    2011-02-01

    The use of Monte Carlo track structure is a choice method in biophysical modelling and calculations. To precisely model 3D and 4D tracks, the cross section for the ionisation by an incoming ion, double differential in the outgoing electron energy and angle, is required. However, the double differential cross section cannot be theoretically modelled over the full range of parameters. To address this issue, a database of all available experimental data has been constructed. Currently, the database of Experimental Double Differential Ionisation Cross sections (EDDIX) contains over 1200 digitalised experimentally measured datasets from the 1960s to present date, covering all available ion species (hydrogen to uranium) and all available target species. Double differential cross sections are also presented with the aid of an eight parameter functions fitted to the cross sections. The parameters include projectile species and charge, target nuclear charge and atomic mass, projectile atomic mass and energy, electron energy and deflection angle. It is planned to freely distribute EDDIX and make it available to the radiation research community for use in the analytical and numerical modelling of track structure.

  1. Environment Canada's new on-line reporting system for environmental emergency plans under CEPA, Sections 199 and 200

    International Nuclear Information System (INIS)

    Rudin-Brown, P.

    2003-01-01

    One of the objectives of Canada's Environmental Emergencies program is to reduce the frequency, severity and consequences of spill events by promoting preventative measures and emergency preparedness. The program also offers advice on response methods and advancing science and technology. This paper from a poster session announces that the E2 program is expected to be administered online by late 2003. The compiled database is expected to serve as a useful statistical reference for the public, decision makers, and first responders. Users will be able to access information regarding controlled substances. In particular, sections 199 and 200 of the Environmental Emergency regulations in the Canadian Environmental Protection Act (CEPA) require that any person in Canada who manages a listed substance in large quantities provide Environment Canada with information on the quantity of the substance, the facility location, and prepare a contingency plan

  2. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  3. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    Science.gov (United States)

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  4. Fluid management plan for the Project Shoal Area Offsites Subproject

    International Nuclear Information System (INIS)

    1996-08-01

    The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject's Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria

  5. Applying the model of Goal-Directed Behavior, including descriptive norms, to physical activity intentions: A contribution to improving the Theory of Planned Behavior

    Science.gov (United States)

    The theory of planned behavior (TPB) has received its fair share of criticism lately, including calls for it to retire. We contributed to improving the theory by testing extensions such as the model of goal-directed behavior (MGDB, which adds desire and anticipated positive and negative emotions) ap...

  6. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  7. 7 CFR 634.23 - Water quality plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  8. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  9. 30 CFR 46.4 - Training plan implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4..., SURFACE CLAY, COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.4 Training plan implementation. (a... accordance with the written training plan; (2) Presented by a competent person; and (3) Presented in language...

  10. Brainstorming workshop: Improving the section's effectiveness within the organization

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-28

    In response to changing priorities at Ontario Hydro which led to a reduction in the volume of traditional work, the Mechanical Testing and Development Section of Ontario Hydro's Research Division organized a workshop to discuss ways to adapt to the new situation. Ontario Hydro's priorities have shifted away from building new supply and toward improving nuclear plant availability, demand management and non-utility generation, the environment, and the refurbishment of existing facilities. The Research Division must operate in this environment like a business, since it does not have an exclusively assigned mandate. The division has internal and external competitors, operates under financial and staff restraints, and lacks a plan for the future. Recommendations arising from the workshop discussions are outlined in the areas of promotion, potential work areas, existing work areas, and productivity. Major recommendations include establishing a committee to attract work, providing seed money for new work areas, advertising the Section's services and capabilities, and implementing a Section-wide quality program. 1 fig.

  11. Family-Directed Transition Planning Guide.

    Science.gov (United States)

    Colorado State Dept. of Education, Denver. Div. of Special Education Services.

    This guide to family-directed transition planning is intended to help parents and students with disabilities take leading roles in the process of transition from school to post-school activities. First, a letter to families examines the challenge of change and the transition process. Section 2 examines regulations that affect transition planning,…

  12. Transportation Business Plan: strategy options document

    International Nuclear Information System (INIS)

    1984-10-01

    This document provides the framework for development of a business plan for establishing and operating the transportation system necessary to support a repository. Section I contains introductory material and defines the plan in terms of policy basis, purpose, and scope of business activities. Section II discusses the evolving strategy that will direct the Department's business actions and describes various strategy options that are under consideration. Also discussed in Section II is a process for the systematic development and acquisition of the transportation system. This process is based on a phased development approach with business activities divided into four stages: system definition; engineering development and certification; cask fleet procurement and carrier negotiations; and transportation operations. 8 figures, 2 tables

  13. The Performance of New Accrual Accounting Plan in Tehran University of Medical Sciences from Financial Staff Perspective: A Cross-sectional Analysis

    Directory of Open Access Journals (Sweden)

    Alireza Mahboub Ahari

    2015-08-01

    Full Text Available ​ Background and objectives : Accrual Accounting System was developed to determine the actual cost of organizational performance. This type of accounting approach is adopted as a main control lever for development and implementation of operational budget within public organizations. Since medical universities play a significant role in society's health and the major part of the country’s budget is devoted to it, the study was accomplished to study the main findings of Iranian New Financial Plan in a governmental medical university. Study will provide better insight on how the plan could meet supposed objectives. Material and Methods: In this cross-sectional study, 46 accounting staffs of Tehran University of Medical Sciences (TUMS were selected by accidental sampling and studied by using a 22-item questionnaire. Respondents were asked to answer the questions about how the plan was performed in their departments and whether it was a success or a failure. We used T-Test and Analysis of Variance for mean comparison. Data were analyzed using SPSS16 software. Results: Most of the respondents were male (52.2% and graduated with bachelor degree in accounting and 65% of the respondents had at least a little knowledge of accrual accounting fundamentals. The study results showed that most of the respondents implied that the outcomes of the implemented plan were satisfying. Respondents who were graduated in financial majors had higher satisfaction rate than others. Conclusion: The role of a comprehensive information system as an underlying and challenging necessity should be emphasized in accrual accounting system. Performance based budgeting system as a frequently focused program in Iranian socio-economic public organizations and Iran’s Ministry of Health and Medical Education should be fitted with the settlement of new financial plan.

  14. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... into your life Breastfeeding in daily life: At home and in public Laws that support breastfeeding 10 ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural ...

  15. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  16. 29 CFR 2520.101-4 - Annual funding notice for multiemployer defined benefit pension plans.

    Science.gov (United States)

    2010-07-01

    ... pension plans. 2520.101-4 Section 2520.101-4 Labor Regulations Relating to Labor (Continued) EMPLOYEE... pension plans. (a) In general. (1) Except as provided in paragraph (a)(2) of this section, pursuant to section 101(f) of the Act, the administrator of a defined benefit, multiemployer pension plan shall...

  17. 14 CFR 380.33a - Operator's option plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Operator's option plan. 380.33a Section 380... option plan. (a) For the purposes of this part, an operator's option plan contract that states... flight leg. (b) Operator's option plan contracts shall state, in addition to the information required by...

  18. Radiation therapy treatment planning: CT, MR imaging and three-dimensional planning

    International Nuclear Information System (INIS)

    Lichter, A.S.

    1987-01-01

    The accuracy and sophistication of radiation therapy treatment planning have increased rapidly in the last decade. Currently, CT-based treatment planning is standard throughout the country. Care must be taken when CT is used for treatment planning because of clear differences between diagnostic scans and scans intended for therapeutic management. The use of CT in radiation therapy planning is discussed and illustrated. MR imaging adds another dimension to treatment planning. The ability to use MR imaging directly in treatment planning involves an additional complex set of capabilities from a treatment planning system. The ability to unwarp the geometrically distorted MR image is a first step. Three-dimensional dose calculations are important to display the dose on sagittal and acoronal sections. The ability to integrate the MR and CT images into a unified radiographic image is critical. CT and MR images are two-dimensional representations of a three-dimensional problem. Through sophisticated computer graphics techniques, radiation therapists are now able to integrate a three-dimensional image of the patient into the treatment planning process. This allows the use of noncoplanar treatment plans and a detailed analysis of tumor and normal tissue anatomy; it is the first step toward a fully conformational treatment planning system. These concepts are illustrated and future research goals outlined

  19. 25 CFR 170.415 - What is pre-project planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall...

  20. 25 CFR 1000.50 - What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase requirements? 1000.50 Section 1000.50 Indians OFFICE OF THE...) Planning and Negotiation Grants Advance Planning Grant Funding § 1000.50 What must a Tribe/Consortium...

  1. 7 CFR 650.5 - Environmental evaluation in planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Environmental evaluation in planning. 650.5 Section...-Assisted Programs § 650.5 Environmental evaluation in planning. (a) General. Environmental evaluation (EE) integrates environmental concerns throughout the planning, installation, and operation of NRCS-assisted...

  2. 33 CFR 151.57 - Waste management plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Waste management plans. 151.57... Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.57 Waste management... follows the plan. (c) Each waste management plan under paragraph (b) of this section must be in writing...

  3. 30 CFR 77.1500 - Auger mining; planning.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Auger mining; planning. 77.1500 Section 77.1500 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.1500 Auger mining; planning. Auger mining shall be planned and conducted by the operator to insure...

  4. 7 CFR 1410.22 - CRP conservation plan.

    Science.gov (United States)

    2010-01-01

    ... productive capability of the soil, improve water quality, protect wildlife or wetlands, protect a public well... plans and revisions of such plans shall be subject to the approval of CCC. (f) Mid-cover management... 7 Agriculture 10 2010-01-01 2010-01-01 false CRP conservation plan. 1410.22 Section 1410.22...

  5. 46 CFR 154.1816 - Cargo location plan.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo location plan. 154.1816 Section 154.1816 Shipping... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1816 Cargo location plan. The master shall ensure that: (a) A cargo location plan is prepared that gives: (1) The location and...

  6. Olfactory neuroblastoma: the long-term outcome and late toxicity of multimodal therapy including radiotherapy based on treatment planning using computed tomography

    International Nuclear Information System (INIS)

    Mori, Takashi; Onimaru, Rikiya; Onodera, Shunsuke; Tsuchiya, Kazuhiko; Yasuda, Koichi; Hatakeyama, Hiromitsu; Kobayashi, Hiroyuki; Terasaka, Shunsuke; Homma, Akihiro; Shirato, Hiroki

    2015-01-01

    Olfactory neuroblastoma (ONB) is a rare tumor originating from olfactory epithelium. Here we retrospectively analyzed the long-term treatment outcomes and toxicity of radiotherapy for ONB patients for whom computed tomography (CT) and three-dimensional treatment planning was conducted to reappraise the role of radiotherapy in the light of recent advanced technology and chemotherapy. Seventeen patients with ONB treated between July 1992 and June 2013 were included. Three patients were Kadish stage B and 14 were stage C. All patients were treated with radiotherapy with or without surgery or chemotherapy. The radiation dose was distributed from 50 Gy to 66 Gy except for one patient who received 40 Gy preoperatively. The median follow-up time was 95 months (range 8–173 months). The 5-year overall survival (OS) and relapse-free survival (RFS) rates were estimated at 88% and 74%, respectively. Five patients with stage C disease had recurrence with the median time to recurrence of 59 months (range 7–115 months). Late adverse events equal to or above Grade 2 in CTCAE v4.03 were observed in three patients. Multimodal therapy including radiotherapy with precise treatment planning based on CT simulation achieved an excellent local control rate with acceptable toxicity and reasonable overall survival for patients with ONB

  7. 47 CFR 101.4 - Transition plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...

  8. 47 CFR 90.1213 - Band plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Band plan. 90.1213 Section 90.1213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND... § 90.1213 Band plan. The following channel center frequencies are permitted to be aggregated for...

  9. WIPP documentation plan

    International Nuclear Information System (INIS)

    Plung, D.L.; Montgomery, T.T.; Glasstetter, S.R.

    1986-01-01

    In support of the programs at the Waste Isolation Pilot Plant (WIPP), the Publications and Procedures Section developed a documentation plan that provides an integrated document hierarchy; further, this plan affords several unique features: 1) the format for procedures minimizes the writing responsibilities of the technical staff and maximizes use of the writing and editing staff; 2) review cycles have been structured to expedite the processing of documents; and 3) the numbers of documents needed to support the program have been appreciably reduced

  10. 76 FR 10544 - Approval and Promulgation of Air Quality Implementation Plans, State of Louisiana

    Science.gov (United States)

    2011-02-25

    ..., were submitted by the State of Louisiana, and include formatting changes, regulatory wording changes... available only in hard copy. Publicly available docket materials are available either electronically in http://www.regulations.gov or in hard copy at the Air Planning Section (6PD- L), Environmental Protection...

  11. Automation model of sewerage rehabilitation planning.

    Science.gov (United States)

    Yang, M D; Su, T C

    2006-01-01

    The major steps of sewerage rehabilitation include inspection of sewerage, assessment of structural conditions, computation of structural condition grades, and determination of rehabilitation methods and materials. Conventionally, sewerage rehabilitation planning relies on experts with professional background that is tedious and time-consuming. This paper proposes an automation model of planning optimal sewerage rehabilitation strategies for the sewer system by integrating image process, clustering technology, optimization, and visualization display. Firstly, image processing techniques, such as wavelet transformation and co-occurrence features extraction, were employed to extract various characteristics of structural failures from CCTV inspection images. Secondly, a classification neural network was established to automatically interpret the structural conditions by comparing the extracted features with the typical failures in a databank. Then, to achieve optimal rehabilitation efficiency, a genetic algorithm was used to determine appropriate rehabilitation methods and substitution materials for the pipe sections with a risk of mal-function and even collapse. Finally, the result from the automation model can be visualized in a geographic information system in which essential information of the sewer system and sewerage rehabilitation plans are graphically displayed. For demonstration, the automation model of optimal sewerage rehabilitation planning was applied to a sewer system in east Taichung, Chinese Taiwan.

  12. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1993-02-01

    This document is a revision of the original Mexiacan Hat Remedial Action Plan (RAP) and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. This RAP has been developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3. 0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 presents the water resources protection strategy. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the on- site workers. Section 7.0 lists the responsibilities of the project participants. Section 8.0 describes the features of the long-term surveillance and maintenance plan

  13. Patterns of service use in two types of managed behavioral health care plans.

    Science.gov (United States)

    Merrick, Elizabeth L; Hodgkin, Dominic; Hiatt, Deirdre; Horgan, Constance M; Azzone, Vanessa; McCann, Bernard; Ritter, Grant; Zolotusky, Galima; McGuire, Thomas G; Reif, Sharon

    2010-01-01

    The study examined service use patterns by level of care in two managed care plans offered by a national managed behavioral health care organization (MBHO): an employee assistance program (EAP) combined with a standard behavioral health plan (integrated plan) and a standard behavioral health plan. The cross-sectional analysis used 2004 administrative data from the MBHO. Utilization of 11 specific service categories was compared. The weighted sample reflected exact matching on sociodemographic characteristics (unweighted N=710,014; weighted N=286,750). A larger proportion of enrollees in the integrated plan than in the standard plan used outpatient mental health and substance abuse office visits (including EAP visits) (p<.01) and substance abuse intensive outpatient or day treatment (p<.05), and the proportion using residential substance abuse rehabilitation was lower (p<.05). The integrated and standard products had distinct utilization patterns in this large MBHO. In particular, greater use of certain outpatient services was observed in the integrated plan.

  14. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  15. Progressive IRP Models for Power Resources Including EPP

    Directory of Open Access Journals (Sweden)

    Yiping Zhu

    2017-01-01

    Full Text Available In the view of optimizing regional power supply and demand, the paper makes effective planning scheduling of supply and demand side resources including energy efficiency power plant (EPP, to achieve the target of benefit, cost, and environmental constraints. In order to highlight the characteristics of different supply and demand resources in economic, environmental, and carbon constraints, three planning models with progressive constraints are constructed. Results of three models by the same example show that the best solutions to different models are different. The planning model including EPP has obvious advantages considering pollutant and carbon emission constraints, which confirms the advantages of low cost and emissions of EPP. The construction of progressive IRP models for power resources considering EPP has a certain reference value for guiding the planning and layout of EPP within other power resources and achieving cost and environmental objectives.

  16. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  17. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  18. 42 CFR 56.105 - Accord with health planning.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Accord with health planning. 56.105 Section 56.105... HEALTH SERVICES General Provisions § 56.105 Accord with health planning. A grant may be made under this... appropriate health planning agencies have been met. ...

  19. 46 CFR 44.01-13 - Heavy weather plan.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Heavy weather plan. 44.01-13 Section 44.01-13 Shipping... VOYAGES Administration § 44.01-13 Heavy weather plan. (a) Each heavy weather plan under § 44.01-12(b) must... Inspection. Approval of a heavy weather plan is limited to the current hurricane season. (b) The cognizant...

  20. 47 CFR 101.1405 - Channeling plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Channeling plan. 101.1405 Section 101.1405 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... Channeling plan. Each license shall have one spectrum block of 500 megahertz per geographic area that can be...

  1. Constructional project planning and atomic energy law - the Wackersdorf reprocessing plant as an example

    International Nuclear Information System (INIS)

    Hofmann, J.

    1989-01-01

    The article discusses a provisional order issued by the 22nd senate of the Munich Higher Administrative Court on December 19, 1985 in accordance with section 47 VII VwGO (Rules of Administrative Courts), and a decision by the same senate on a voidance petition, taken on January 29, 1988, which however is not final due to a notice of appeal. The problematic items discussed include the consideration of interests not specific to constructional planning in the planning procedure according to construction planning laws, the significance of the amendment of 1976 of the Federal Building Act, the obligation to settle conflicts, the definition of scope and limits of this obligation, as well as the planning-related requirements set by the construction planning law fo nuclear installations. (RST) [de

  2. 29 CFR 2510.3-2 - Employee pension benefit plan.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Employee pension benefit plan. 2510.3-2 Section 2510.3-2... TERMS USED IN SUBCHAPTERS C, D, E, F, AND G OF THIS CHAPTER § 2510.3-2 Employee pension benefit plan. (a) General. This section clarifies the limits of the defined terms “employee pension benefit plan” and...

  3. 40 CFR 52.2063 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... Reading Air Basin SO2 strategy submitted March 27, 1972, by the Pennsylvania Department of Environmental..., gasoline marketing, pharmaceutical products, and compliance schedules. (B) The definitions of bulk gasoline..., subsections B and C. (10) Deletion of Section 506 that was in effect before August 26, 1991. (86) Revisions to...

  4. Planned home compared with planned hospital births: mode of delivery and Perinatal mortality rates, an observational study.

    Science.gov (United States)

    van der Kooy, Jacoba; Birnie, Erwin; Denktas, Semiha; Steegers, Eric A P; Bonsel, Gouke J

    2017-06-08

    To compare the mode of delivery between planned home versus planned hospital births and to determine if differences in intervention rates could be interpreted as over- or undertreatment. Intervention and perinatal mortality rates were obtained for 679,952 low-risk women from the Dutch Perinatal Registry (2000-2007). Intervention was defined as operative vaginal delivery and/or caesarean section. Perinatal mortality was defined as the intrapartum and early neonatal mortality rate up to 7 days postpartum. Besides adjustment for maternal and care factors, we included for additional casemix adjustment: presence of congenital abnormality, small for gestational age, preterm birth, or low Apgar score. The techniques used were nested multiple stepwise logistic regression, and stratified analysis for separate risk groups. An intention-to-treat like analysis was performed. The intervention rate was lower in planned home compared to planned hospital births (10.9% 95% CI 10.8-11.0 vs. 13.8% 95% CI 13.6-13.9). Intended place of birth had significant impact on the likelihood to intervene after adjustment (planned homebirth (OR 0.77 95% CI. 0.75-0.78)). The mortality rate was lower in planned home births (0.15% vs. 0.18%). After adjustment, the interaction term home- intervention was significant (OR1.51 95% CI 1.25-1.84). In risk groups, a higher perinatal mortality rate was observed in planned home births. The potential presence of over- or under treatment as expressed by adjusted perinatal mortality differs per risk group. In planned home births especially multiparous women showed universally lower intervention rates. However, the benefit of substantially fewer interventions in the planned home group seems to be counterbalanced by substantially increased mortality if intervention occurs.

  5. 7 CFR 22.306 - Financing rural development planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Financing rural development planning. 22.306 Section... Responsibilities of State Governments § 22.306 Financing rural development planning. States will be required to finance rural development planning through their own resources, revenue-sharing allocations, or the...

  6. 36 CFR 230.6 - Landowner forest stewardship plan.

    Science.gov (United States)

    2010-07-01

    ... manage soil, water, aesthetic qualities, recreation, timber, and fish and wildlife resources in a manner... sells or otherwise conveys land covered by a landowner forest stewardship plan, such plan shall remain... plan. 230.6 Section 230.6 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE...

  7. 76 FR 69217 - Approval and Promulgation of State Implementation Plans; State of Utah; Smoke Management...

    Science.gov (United States)

    2011-11-08

    ... evaluation. States must include in their section 309 plan a statewide process for gathering the essential... the criteria of efficiency, economics, law, emission reduction opportunities, land management... data that is essential for determining the dispersion of smoke from a fire and what areas it may...

  8. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  9. Systems principles of planning the net cost of oil and gas extraction

    Energy Technology Data Exchange (ETDEWEB)

    Ryazanova, N I

    1979-01-01

    The automated system of calculation of ASPC ''oil extraction'' is developed in order to improve the existing system of planning of the oil extracting sector. The most complete expression of the systems construction of the plan is found in the section ''net cost and profit.'' Unity of the production process advances definite requirements for construction of the plan for net cost of oil and gas extraction as the model of this unified process. According to these requirements, the plan for net cost must be developed on the basis of interrelationship of the indicators of the plan for net cost within the section and with indicators of other sections of the plan, methodological unity and continuity of the methods of planning net cost by elements of outlays, articles of calculation and technical-economic factors, methodological continuity of regimes and stages of planning, as well as based on methodological continuity of the control levels. The listed requirements are principles for systems planning of the net cost of oil and gas extraction. These principles guarantee improvement in planning of net cost of oil and gas extraction according to the requirements made for the national economic planning.

  10. Family planning utilization and factors associated among women receiving abortion services in health facilities of central zone towns of Tigray, Northern Ethiopia: a cross sectional Study.

    Science.gov (United States)

    Hagos, Goshu; Tura, Gurmesa; Kahsay, Gizienesh; Haile, Kebede; Grum, Teklit; Araya, Tsige

    2018-06-05

    Abortion remains among the leading causes of maternal death worldwide. Post-abortion contraception is significantly effective in preventing unintended pregnancy and abortion if provided before women leave the health facilty. However, the status of post-abortion family planning (PAFP) utilization and the contributing factors are not well studied in Tigray region. So, we conduct study aimed on family planning utilization and factors associated with it among women receiving abortion services. A facility based cross-sectional study design was conducted among women receiving abortion services in central zone of Tigray from December 2015to February 2016 using a total of 416 sample size. Women who came for abortion services were selected using systematic random sampling technique.. The data were collected using a pre-tested interviewer administered questionnair. Data were coded and entered in to Epi info 7 and then exported to SPSS for analysis. Descriptive statisticslike frequencies and mean were computed to display the results. Both Bivariable and multivariable logistic regression was used in the analysis. Variables statistically significant at p < 0.05 in the bivariable analysis were checked in multivariable logistic regration to identify independently associated factors. Then variables which were significantly associated with post abortion family planning utilization at p-value < 0.05 in the multivariable analysis were declared as significantly associated factors. A total of 409 abortion clients were interviewed in this study with 98.3% of response rate. Majority 290 (70.9%) of study participants utilized contracepives after abortion. Type of health facility, the decision maker on timing of having child, knowledge that pregnancy can happen soon after abortion and husband's opposition towards contraceptives were significantly associated with Post-abortion family planning ustilization. About one-third of abortion women failed to receive contraceptive before

  11. 47 CFR 101.1505 - Segmentation plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Segmentation plan. 101.1505 Section 101.1505 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Service and Technical Rules for the 70/80/90 GHz Bands § 101.1505 Segmentation plan. (a) An entity...

  12. 42 CFR 137.410 - For the purposes of section 110 of the Act [25 U.S.C. 450m-1] does the term contract include...

    Science.gov (United States)

    2010-10-01

    ....C. 450m-1] does the term contract include compacts, funding agreements, and construction project... the term contract include compacts, funding agreements, and construction project agreements entered into under Title V? Yes, for the purposes of section 110 of the Act [25 U.S.C. 450m-1] the term...

  13. Software configuration management plan, 241-AY and 241-AZ tank farm MICON automation system

    International Nuclear Information System (INIS)

    Hill, L.F.

    1997-01-01

    This document establishes a Computer Software Configuration Management Plan (CSCM) for controlling software for the MICON Distributed Control System (DCS) located at the 241-AY and 241-AZ Aging Waste Tank Farm facilities in the 200 East Area. The MICON DCS software controls and monitors the instrumentation and equipment associated with plant systems and processes. A CSCM identifies and defines the configuration items in a system (section 3.1), controls the release and change of these items throughout the system life cycle (section 3.2), records and reports the status of configuration items and change requests (section 3.3), and verifies the completeness and correctness of the items (section 3.4). All software development before initial release, or before software is baselined, is considered developmental. This plan does not apply to developmental software. This plan applies to software that has been baselined and released. The MICON software will monitor and control the related instrumentation and equipment of the 241-AY and 241-AZ Tank Farm ventilation systems. Eventually, this software may also assume the monitoring and control of the tank sludge washing equipment and other systems as they are brought on line. This plan applies to the System Cognizant Manager and MICON Cognizant Engineer (who is also referred to herein as the system administrator) responsible for the software/hardware and administration of the MICON system. This document also applies to any other organizations within Tank Farms which are currently active on the system including system cognizant engineers, nuclear operators, technicians, and control room supervisors

  14. Activation cross section data file, (1)

    International Nuclear Information System (INIS)

    Yamamuro, Nobuhiro; Iijima, Shungo.

    1989-09-01

    To evaluate the radioisotope productions due to the neutron irradiation in fission of fusion reactors, the data for the activation cross sections ought to be provided. It is planning to file more than 2000 activation cross sections at final. In the current year, the neutron cross sections for 14 elements from Ni to W have been calculated and evaluated in the energy range 10 -5 to 20 MeV. The calculations with a simplified-input nuclear cross section calculation system SINCROS were described, and another method of evaluation which is consistent with the JENDL-3 were also mentioned. The results of cross section calculation are in good agreement with experimental data and they were stored in the file 8, 9 and 10 of ENDF/B format. (author)

  15. 7 CFR 1466.9 - EQIP plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false EQIP plan of operations. 1466.9 Section 1466.9... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of...

  16. 21 CFR 25.10 - Policies and NEPA planning.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Policies and NEPA planning. 25.10 Section 25.10... ENVIRONMENTAL IMPACT CONSIDERATIONS General Provisions § 25.10 Policies and NEPA planning. (a) All FDA's... future generations. (b) Assessment of environmental factors continues throughout planning and is...

  17. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  18. Balanced program plan: analysis for biomedical and environmental research. Volume 7. Conservation and energy efficiency

    International Nuclear Information System (INIS)

    1975-07-01

    Energy conservation technologies encompass the entire spectrum of human activities: electrical supply, industry, commercial and residential buildings, transportation and various overlapping combinations of these. This report is concerned with those conservation technologies that appear to be most important in the near and intermediate terms. Many of the specific R and D programs are contained in the preliminary ''Conservation Program Plan'' of the ERDA Assistant Administrator for Conservation. However, some projects are included that are supported by other Federal agencies and private industry. Section 1 contains a brief description of each conservation technology and an enumeration of health/safety/environmental impacts, both beneficial and adverse, that are expected to accrue from the new technology. Section 2 contains a brief discussion of problems, priorities and programs. Section 3 contains ''Problem Definitions'' and ''Program Units'' that are recommended to become a part of the ''BER Balanced Program Plan.''

  19. 49 CFR 613.200 - Statewide transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  20. Propensity score matching in estimating the effect of managerial education on academic planning behavior. Study design: a cross-sectional study

    Directory of Open Access Journals (Sweden)

    Nguyen Huy V

    2011-12-01

    Full Text Available Abstract Background In many academic settings teaching a particular topic is applied to every student enrolled in the same academic year, it is a difficult task for researchers to design a randomized control group study. This research aimed to estimate the effect of teaching management and planning on increasing academic planning behavior (APB, using propensity score matching (PSM. Methods In a cross-sectional survey utilizing a self-reported structured questionnaire on a systematic random sample of 421 students in Hanoi Medical University, one of the eight medical schools in Vietnam, this evaluation study adopted regression procedures to assess model fit, then PSM to create a matched control group in order to allow for evaluating the effect of management education. Results The study showed both direct and indirect effects of the education on behavior. After PSM to adjust for the possible confounders to balance statistically two groups - with and without management education, there is statistically a significant difference in APB between these two groups, making a net difference of 18.60% (p Conclusions The study provided theoretical as well as practical implications to guide the design of the education and evaluation of teaching.

  1. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  2. Foothills Parkway Section 8B Final Environmental Report, Volume 2, Appendices A-C

    Energy Technology Data Exchange (ETDEWEB)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NW, GSMNP, and ORNL staff interacted with Federal Highway Administration staff to develop a conceptual design plan for Section 8B with the intent of protecting critical resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this EN there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constricting Section 8B with an interchange at SR 416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER, which consists of Appendices A, B, and C, assesses the potential geologic impacts of the proposed Section 8B construction, presents the results of the Section 8B soil survey, and describes the water quality studies and analyses performed for the ER. The following summary sections provide information for geology, soils, and water quality.

  3. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  4. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  5. 24 CFR 81.22 - Housing plans.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Housing plans. 81.22 Section 81.22 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development THE... LOAN MORTGAGE CORPORATION (FREDDIE MAC) Housing Goals § 81.22 Housing plans. (a) If the Secretary...

  6. 29 CFR 2550.404c-1 - ERISA section 404(c) plans.

    Science.gov (United States)

    2010-07-01

    ... obtain sufficient information to make informed decisions with regard to investment alternatives available... assure that participant and beneficiary directions to buy or sell the security may be acted upon promptly... affiliated with any sponsor of the plan. (iii) The individual investment decisions of an investment manager...

  7. Best management practices plan for Phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and groundwater contamination and develop remedies to protect human health and the environment. The western end of the site is known to have a former nitric acid disposal pit that has been remediated and capped. Remedial investigation data indicate this pit was a source of nitrate, uranium, technetium, and other metals contamination in groundwater. The downgradient receptor of this contamination includes Bear Creek and its tributaries. A feasibility study is underway to develop a remedy to prevent further contaminant migration to this receptor. To support the feasibility study, a treatability study is being completed to examine groundwater treatment at the S-3 site. This document serves as the top level command medium for Phase II and as such will be the primary resource for management and implementation of field activities. Many of the details and standard operating procedures referred within this document can be found in other Lockheed Martin Energy Systems (Energy Systems) documents. Several supporting documents specific to this project are also cited. These include the Sampling and Analysis Plan (SAP), the Health and Safety Plan (HASP), and the Waste Management Plan (WMP). Section 1 describes the results of Phase I efforts. Section 2 describes the objectives of Phase II. Section 3 provides details of field testing. Section 4 addresses the HASP. Section 5 describes the SAP. Section 6 introduces the WMP. Environmental compliance issues are discussed in Section 7, and sediment and erosion control is addressed in Section 8. Information about the project team is provided in Section 9

  8. Experience on Maintenance of Thai Research Reactor's 'Small-Section' Pool

    International Nuclear Information System (INIS)

    Tippayakul, Chanatip

    2013-01-01

    The reactor pool of TRR-1/M1 has been used since 1962 when the reactor building was constructed. Periodic maintenance of the reactor pool has been conducted by cleaning the pool surface and re-painting with epoxy coating. The TRR-1/M1 pool basically consists of two sections referred as 'large-section' and 'small-section'. The latest re-painting activity of the 'large-section' pool was performed in 2006 but the 'small-section' pool had not been re-painted for more than 10 years. Therefore, to assure that the 'small-section' pool can maintain leak-proof condition, the re-painting of the 'small-section' pool was performed in the early 2012. A project team was organized specially for this project and a detailed execution plan was developed. The project activities include removing foreign objects and highly activated materials from the pool section, cleaning, inspecting, re-painting the pool surface and testing for water leaks. Preparation of the repainting activities had begun 2 years in advance. During the time, the reactor core had been relocated to operate in the large-section pool away from the working area in order to minimize radioactivity. The challenge of this project was to handle 4 sets of highly radioactive bolts and nuts which support the weight of the 'void tank' irradiation facility. These bolts and nuts were made from stainless steel and had been in the flux region since the installation of the 'void tank' irradiation facility approximately 30 years ago. Dose rate measurement at the contacts of these bolts and nuts were found to be in the range of 10 . 20 R/hr. The strategy to minimize the dose rate of the workers to conduct the pool repainting in the area was to remove the bolts and nuts and replace with new ones before entering the area. Special tools were improvised in order to remove the bolts and nuts under water. During the execution of the project, close radiation monitoring was performed by the radiation protection team. The project was conducted

  9. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  10. 7 CFR 1250.314 - Plans and projects.

    Science.gov (United States)

    2010-01-01

    ... research, consumer and producer education, advertising, marketing, product development, and promotion plans... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING...

  11. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  12. [Caesarean section with vacuum extraction of the head].

    Science.gov (United States)

    Dimitrov, A; Pavlova, E; Krŭsteva, K; Nikolov, A

    2008-01-01

    The aim of the study is to investigate the benefits and the limits in using the soft cup vacuum extractor on the fetal scalp during the caesarean section. The prospective study includes 19 cases of caesarean sections (group A), with vacuum assisted delivery using the soft cup vacuum extractor on the fetal scalp (diameter 6 cm) and 25 cases (group B) of caesarean sections with usual, manual extraction of the head assisted by fundal compression. All of the patients had undergone a planned caesarean section on term in absence of uterine activity and preserved amniotic membranes. Our results doesn't show differences in the Apgar score on the first and 5-th minute in the newborns of the two groups. The duration of the scalp traction was significantly shorter (30 +/- 4 sec) in comparison to the classical manual extraction (53 +/- 21 sec). The mean duration for applying the vacuum cup was 10 sec and 25 sec for tractions. The total blood loose and total duration of the caesarean sections were shorter than in the control group. The applied traction with the vacuum cup was sufficient for head extraction and there was no need for additional fundal compression. In conclusion we consider that the extraction of the fetal head in high position in caesarean section with vacuum extractor is an easy, non traumatic and rapid method which can put away the need of rough and prolonged fundal compression and its consequences.

  13. Priority cross-sections. Joint Nordic analyses of important cross-sections in the Nordel system. Main report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-06-01

    The Nordic Grid Master Plan 2002 shed light on the energy and power balance for the Nordel area but with special focus on 2005. There was a lot to suggest that the tradi-tional transport patterns with frequent southbound transports would change and be more frequently replaced by northbound transports. Against this background, a number of cross-sections were identified within the Nordel area where expansion is expected to have considerable significance for the Nordic elec-tricity market. The present report 'Priority Cross-sections' concludes the work which was started with the grid master plan. The priority cross-sections are subjected to a technical and socio-economic analysis. The analysis aims to understand the transports in the Nordel system and to support Nor-del when prioritizing forthcoming initiatives. The market price is the driving force for the initiatives which will be carried out on the supply and demand side. The commissioning and decommissioning of commercial pro-duction capacity is determined by the market players, and the task of the transmission system operators (TSOs) is to ensure a robust infrastructure for the smooth operation of the electricity market. (au)

  14. [Fast neutron cross section measurements

    International Nuclear Information System (INIS)

    1991-01-01

    In the 14 MeV Neutron Laboratory, we have continued the development of a facility that is now the only one of its kind in operation in the United States. We have refined the klystron bunching system described in last year's report to the point that 1.2 nanosecond pulses have been directly measured. We have tested the pulse shape discrimination capability of our primary NE 213 neutron detector. We have converted the RF sweeper section of the beamline to a frequency of 1 MHz to replace the function of the high voltage pulser described in last year's report which proved to be difficult to maintain and unreliable in its operation. We have also overcome several other significant experimental difficulties, including a major problem with a vacuum leak in the main accelerator column. We have completed additional testing to prove the remainder of the generation and measurement systems, but overcoming some of these experimental difficulties has delayed the start of actual data taking. We are now in a position to begin our first series of ring geometry elastic scattering measurements, and these will be underway before the end of the current contract year. As part of our longer term planning, we are continuing the conceptual analysis of several schemes to improve the intensity of our current pulsed beam. These include the provision of a duoplasmatron ion source and/or the provision of preacceleration bunching. Additional details are given later in this report. A series of measurements were carried out at the Tandem Dynamatron Facility involving the irradiation of a series of yttrium foils and the determination of activation cross sections using absolute counting techniques. The experimental work has been completed, and final analysis of the cross section data will be completed within several months

  15. Foothills Parkway Section 8B Final Environmental Report, Volume 6, Appendix N

    Energy Technology Data Exchange (ETDEWEB)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NPS, GSMNP, and ORNL staff interacted with Federal Highway Administration staff to develop a conceptual design plan for Section 8B with the intent of protecting critical resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this ER, there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constructing Section 8B with an interchange at SR 416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER documents the results of the architectural, historical, and cultural resources assessment for the entire Section 8B ROW that was completed in May 1995 to document the architectural, historical, and cultural resources located within the project area. The assessment included evaluation of the potential for cultural (i.e., rural historic) landscapes in the area of the ROW. The assessment showed that one National Register-listed property is located 0.3 mile south of the ROW

  16. 12 CFR 1282.22 - Housing plans.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Housing plans. 1282.22 Section 1282.22 Banks and Banking FEDERAL HOUSING FINANCE AGENCY HOUSING GOALS AND MISSION ENTERPRISE HOUSING GOALS AND MISSION Housing Goals § 1282.22 Housing plans. (a) If the Director determines, under § 1282.21, that an...

  17. Guidelines for conducting pharmaceutical budget impact analyses for submission to public drug plans in Canada.

    Science.gov (United States)

    Marshall, Deborah A; Douglas, Patrick R; Drummond, Michael F; Torrance, George W; Macleod, Stuart; Manti, Orlando; Cheruvu, Lokanadha; Corvari, Ron

    2008-01-01

    Until now, there has been no standardized method of performing and presenting budget impact analyses (BIAs) in Canada. Nevertheless, most drug plan managers have been requiring this economic data to inform drug reimbursement decisions. This paper describes the process used to develop the Canadian BIA Guidelines; describes the Guidelines themselves, including the model template; and compares this guidance with other guidance on BIAs. The intended audience includes those who develop, submit or use BIA models, and drug plan managers who evaluate BIA submissions. The Patented Medicine Prices Review Board (PMPRB) initiated the development of the Canadian BIA Guidelines on behalf of the National Prescription Drug Utilisation Information System (NPDUIS). The findings and recommendations from a needs assessment with respect to BIA submissions were reviewed to inform guideline development. In addition, a literature review was performed to identify existing BIA guidance. The detailed guidance was developed on this basis, and with the input of the NPDUIS Advisory Committee, including drug plan managers from multiple provinces in Canada and a representative from the Canadian Agency for Drugs and Technologies in Health. A Microsoft Excel-based interactive model template was designed to support BIA model development. Input regarding the guidelines and model template was sought from each NPDUIS Advisory Committee member to ensure compatibility with existing drug plan needs. Decisions were made by consensus through multiple rounds of review and discussion. Finally, BIA guidance in Canadian provinces and other countries were compared on the basis of multiple criteria. The BIA guidelines consist of three major sections: Analytic Framework, Inputs and Data Sources, and Reporting Format. The Analytic Framework section contains a discussion of nine general issues surrounding BIAs (model design, analytic perspective, time horizon, target population, costing, scenarios to be compared

  18. 40 CFR 35.917 - Facilities planning (step 1).

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning (step 1). 35.917... Facilities planning (step 1). (a) Sections 35.917 through 35.917-9 establish the requirements for facilities... the facilities planning provisions of this subpart before award of step 2 or step 3 grant assistance...

  19. 18 CFR 401.2 - Concept of the plan.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Concept of the plan. 401.2 Section 401.2 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Comprehensive Plan § 401.2 Concept of the plan. (a) The...

  20. 29 CFR 1953.4 - Submission of plan supplements.

    Science.gov (United States)

    2010-07-01

    ... effective” status of the State program if a parallel State program modification were not made, State... (CONTINUED) CHANGES TO STATE PLANS § 1953.4 Submission of plan supplements. (a) Developmental changes. (1) Sections 1902.2(b) and 1956.2(b) of this chapter require that each State with a developmental plan must set...

  1. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  2. "Estuaries and coasts" CLIL* lesson plans in English and geology fieldtrip to Cornwall for students in European section

    Science.gov (United States)

    Bontempelli, Nathalie; Voyer, Karine; Lebourgeois, Patrick

    2013-04-01

    When the European section was created in our high school we had to choose an overarching theme. After considering that we live both in the River Seine estuary and near the English Channel it became obvious that our theme should be "estuaries and coasts". We began the 2012-2013 school year with a day-trip around the River Seine estuary to introduce the theme. First we made a general landscape study from a viewpoint, then we discussed the history of the navigation on the Seine, of local farming on marshland and finally we focused on farmhouse architecture. To conclude we visited the natural reserve near the "Normandy Bridge". As an introduction our poster aims at presenting this part of Normandy. And then we would like to show some examples of our CLIL lesson plans about this chosen topic. The aim of a CLIL lesson is to create interactive speaking between students working in pairs or in groups. There are three different stages: - Warm-up activities - In-depth study: listening, reading, echoing, looking for information on the internet, making a slide show and doing an oral presentation, participating to a role play… - Assessment : using what has been learnt to answer questions Finally we wish to present our field trip to Cornwall. We have already done it twice before (in 2002 and 2004) and this year it is scheduled in May 2013 with our European section students. The aim of this trip is to study geology and botany in English in order to extend what we teach in our CLIL lessons about estuaries and coasts. It also helps promoting exchanges with British families and building intercultural knowledge and understanding. Our program includes for example, fossil hunting and studying the Jurassic cliffs in Charmouth, observing an old ocean crust in Coverack, visiting Saint-Mickael's mount, discovering a tin mine in Geevor, walking through the "Lost Gardens of Heligan" and thus discovering an example of this world-renowned restored English garden, and last but not least having

  3. PFP dangerous waste training plan

    International Nuclear Information System (INIS)

    Khojandi, J.

    1996-01-01

    This document establishes the minimum training requirements for the Plutonium Finishing Plant (PFP) personnel who are responsible for management of dangerous waste. The training plan outlines training requirements for handling of solid dangerous waste during generator accumulation and liquid dangerous waste during treatment and storage operations. The implementation of this training plan will ensure the PFP facility compliance with the training plan requirements of Dangerous Waste Regulation. Chapter 173-303-330. Washington Administrative Code (WAC). The requirements for such compliance is described in Section 11.0 of WHC-CM-7-5 Environmental Compliance Manual

  4. Large-scale projects between regional planning and environmental protection

    International Nuclear Information System (INIS)

    Schmidt, G.

    1984-01-01

    The first part of the work discusses the current law of land-use planning, municipal and technical construction planning, and licensing under the atomic energy law and the federal law on immission protection. In the second part some theses suggesting modifications are submitted. In the sector of land-use planning substantial contributions to the protection of the environment can only be expected from programs and plans (aims). For the environmental conflicts likely to arise from large-scale projects (nuclear power plant, fossil-fuel power plant) this holds good for the most part of site selection plans. They have bearings on environmental protection in that they presuppose thorough examination of facts, help to recognize possible conflicts at an early date and provide a frame for solving those problems. Municipal construction planning is guided by the following principles: Environmental protection is an equivalent planning target. Environmental data and facts and their methodical processing play a fundamental part as they constitute the basis of evaluation. Under the rules and regulations of the federal law on immission protection, section 5, number 2 - prevention of nuisances - operators are obliged to take preventive care of risks. That section is not concerned with planning or distribution. Neither does the licensing of nuclear plants have planning character. So far as the legal preconditions of licensing are fulfilled, the scope for rejection of an application under section 7, subsection 2 of the atomic energy law in view of site selection and requirement of a plant hardly carries any practical weight. (orig./HP) [de

  5. Volumetric Modulated Arc Therapy (VMAT) Treatment Planning for Superficial Tumors

    International Nuclear Information System (INIS)

    Zacarias, Albert S.; Brown, Mellonie F.; Mills, Michael D.

    2010-01-01

    The physician's planning objective is often a uniform dose distribution throughout the planning target volume (PTV), including superficial PTVs on or near the surface of a patient's body. Varian's Eclipse treatment planning system uses a progressive resolution optimizer (PRO), version 8.2.23, for RapidArc dynamic multileaf collimator volumetric modulated arc therapy planning. Because the PRO is a fast optimizer, optimization convergence errors (OCEs) produce dose nonuniformity in the superficial area of the PTV. We present a postsurgical cranial case demonstrating the recursive method our clinic uses to produce RapidArc treatment plans. The initial RapidArc treatment plan generated using one 360 o arc resulted in substantial dose nonuniformity in the superficial section of the PTV. We demonstrate the use of multiple arcs to produce improved dose uniformity in this region. We also compare the results of this superficial dose compensation method to the results of a recursive method of dose correction that we developed in-house to correct optimization convergence errors in static intensity-modulated radiation therapy treatment plans. The results show that up to 4 arcs may be necessary to provide uniform dose to the surface of the PTV with the current version of the PRO.

  6. 222-S Laboratory Quality Assurance Plan. Revision 1

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document

  7. 42 CFR 457.150 - CMS review of State plan material.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false CMS review of State plan material. 457.150 Section... Introduction; State Plans for Child Health Insurance Programs and Outreach Strategies § 457.150 CMS review of State plan material. (a) Basis for action. CMS reviews each State plan and plan amendment to determine...

  8. Prevalence and factors associated with unmet need for family planning among the currently married reproductive age women in Shire-Enda- Slassie, Northern West of Tigray, Ethiopia 2015: a community based cross-sectional study.

    Science.gov (United States)

    Gebre, Gelawdiwos; Birhan, Nigussie; Gebreslasie, Kahsay

    2016-01-01

    Unmet family planning is one of the common causes for low contraceptive prevalence rate in developing countries including Ethiopia. Thus, this study designed to assess the prevalence and associated factors of unmet need in Shire Endaslassie town, Northern west of Tigray, Ethiopia. A community based cross sectional study design was employed. Multistage sampling technique was employed and data were collected using a semi-structured questionnaire by interviewer administered technique. Questionnaires were reviewed and checked for completeness, accuracy and consistency. Reviewed data were entered to Epi info 7 and analyzed by SPSS version 20 statistical software. Variables with P-value of less than 0.2 in bivariate analyses were entered for multivariate analysis and AOR at 95% CI with p-value of less than 0.05 were considered as significant variables. The overall unmet need for family planning in the study area was 109(21.4%). 74(14.5%) for spacing and 35(6.9%) for limiting. Age group of 35-39 and >=40 (AOR= 2.7,95%CI:1.1,6.5), (AOR = 2.65, 95%CI:1.10, 6.40) respectively, decided numbers of desired children more than five (AOR = O.48, 95%CI: 0.28, 0.80), discussions of client with heath care providers (AOR = 6.32, 95%CI: 2.56, 15.58), previous use of modern family planning (AOR = 2.29, 95%CI, 1.20, 4.34) were significantly associated with unmet need for family planning. Unmet need for family planning in the study area was high, so continuous discussion on modern family planning with community health workers and encouraging of women to decide desired numbers of children of less than five in general are better to be strengthened.

  9. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  10. Theory of Planned Behavior including self-stigma and perceived barriers explain help-seeking behavior for sexual problems in Iranian women suffering from epilepsy.

    Science.gov (United States)

    Lin, Chung-Ying; Oveisi, Sonia; Burri, Andrea; Pakpour, Amir H

    2017-03-01

    To apply the Theory of Planned Behavior (TPB) and the two additional concepts self-stigma and perceived barriers to the help-seeking behavior for sexual problems in women with epilepsy. In this 18-month follow-up study, TPB elements, including attitude, subjective norm, perceived behavioral control, and behavioral intention along with self-stigma and perceived barriers in seeking help for sexual problems were assessed in n=818 women with epilepsy (94.0% aged ≤40years). The basic TPB model (model 1) and the TPB model additionally including self-stigma and perceived barriers (Model 2) were analyzed using structural equation modeling (SEM). Both SEM models showed satisfactory model fits. According to model, attitude, subjective norms, perceived behavioral control, and intention explained 63.1% of the variance in help-seeking behavior. Variance was slightly higher (64.5%) when including self-stigma and perceived barriers (model 2). In addition, the fit indices of the models were better highlighting the importance of self-stigma and perceived barriers in help-seeking behavior for sexual problems. Theory of Planned Behavior is useful in explaining help-seeking behavior for sexual problems in women with epilepsy. Self-stigma and perceived barriers are additional factors that should be considered in future interventions aiming to adopt TPB to improve help-seeking behavior for sexual problems. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. 7 CFR 407.17 - Group risk plan for wheat.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Group risk plan for wheat. 407.17 Section 407.17..., DEPARTMENT OF AGRICULTURE GROUP RISK PLAN OF INSURANCE REGULATIONS § 407.17 Group risk plan for wheat. The provisions of the Group Risk Plan for Wheat for the 2000 and succeeding crop years are as follows: 1...

  12. 7 CFR 407.11 - Group risk plan for corn.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Group risk plan for corn. 407.11 Section 407.11..., DEPARTMENT OF AGRICULTURE GROUP RISK PLAN OF INSURANCE REGULATIONS § 407.11 Group risk plan for corn. The provisions of the Group Risk Plan for Corn for the 2000 and succeeding crop years are as follows: 1...

  13. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  14. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  15. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  16. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  17. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  18. Basic considerations in simulated treatment planning for the Stanford Medical Pion Generator (SMPG)

    International Nuclear Information System (INIS)

    Pistenma, D.A.; Li, G.C.; Bagshaw, M.A.

    1977-01-01

    Recent interest in charged heavy particle irradiation is based upon expected improved local tumor control rates because of the greater precision in dose localization and the increased biological effectiveness of the high linear energy transfer ionization of particle beams in their stopping regions (Bragg peaks). A novel 60 beam cylindrical geometry pion spectrometer designed for a hospital-based pion therapy facility has been constructed at Stanford. In conjunction with the development and testing of the SMPG a program of simulated treatment planning is being conducted. This paper presents basic considerations in treatment planning for pions and other charged heavy particles. It also presents the status of simulated treatment planning calculations for the SMPG including a discussion of the principle of irradiation of hypothetical tumor volumes illustrated by examples of simplified treatment plans incorporating tissue density inhomogeneity corrections. Also presented are considerations for realistic simulated treatment planning calculations using computerized tomographic scan cross sections of actual patients and a conceptual plan for an integrated treatment planning and patient treatment system for the SMPG

  19. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project

  20. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  1. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... we are What we do Programs and activities Work with us Contact Us Blog Popular topics Vision and mission Leadership Programs and activities In your community Funding opportunities Internships and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural ...

  2. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  3. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  4. 30 CFR 75.161 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...

  5. TWRS retrieval and disposal mission. Immobilized high-level waste storage plan

    International Nuclear Information System (INIS)

    Calmus, R.B.

    1998-01-01

    This project plan has a two fold purpose. First, it provides a plan specific to the Hanford Tank Waste Remediation System (TWRS) Immobilized High-Level Waste (EMW) Storage Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestone M-90-01 (Ecology et al. 1996) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan. Second, it provides an upper tier document that can be used as the basis for future subproject line item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 (DOE 1992a) and 430.1 (DOE 1995)). The format and content of this project plan are designed to accommodate the plan's dual purpose. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed

  6. 29 CFR 549.3 - Distinction between plan and trust.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Distinction between plan and trust. 549.3 Section 549.3 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS REQUIREMENTS OF A âBONA FIDE PROFIT-SHARING PLAN OR TRUSTâ § 549.3 Distinction between plan and trust. As used in this part: (a) Profit-sharing plan...

  7. Use of a birth plan within woman-held maternity records: a qualitative study with women and staff in northeast Scotland.

    Science.gov (United States)

    Whitford, Heather M; Entwistle, Vikki A; van Teijlingen, Edwin; Aitchison, Patricia E; Davidson, Tracey; Humphrey, Tracy; Tucker, Janet S

    2014-09-01

    Birth plans are written preferences for labor and birth which women prepare in advance. Most studies have examined them as a novel intervention or "outside" formal care provision. This study considered use of a standard birth plan section within a national, woman-held maternity record. Exploratory qualitative interviews were conducted with women (42) and maternity service staff (24) in northeast Scotland. Data were analyzed thematically. Staff and women were generally positive about the provision of the birth plan section within the record. Perceived benefits included the opportunity to highlight preferences, enhance communication, stimulate discussions, and address anxieties. However, not all women experienced these benefits or understood the birth plan's purpose. Some were unaware of the opportunity to complete it or could not access the support they needed from staff to discuss or be confident about their options. Some were reluctant to plan too much. Staff recognized the need to support women with birth plan completion but noted practical challenges to this. A supportive antenatal opportunity to allow discussion of options may be needed to realize the potential benefits of routine inclusion of birth plans in maternity notes. © 2014 Wiley Periodicals, Inc.

  8. 42 CFR 51c.105 - Accord with health planning.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Accord with health planning. 51c.105 Section 51c... COMMUNITY HEALTH SERVICES General Provisions § 51c.105 Accord with health planning. A grant may be made... approval by the appropriate health planning agencies have been met. ...

  9. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  10. Total cross-sections for reactions of high energy particles (including elastic, topological, inclusive and exclusive reactions). Subvol. b

    International Nuclear Information System (INIS)

    Schopper, H.; Moorhead, W.G.; Morrison, D.R.O.

    1988-01-01

    The aim of this report is to present a compilation of cross-sections (i.e. reaction rates) of elementary particles at high energy. The data are presented in the form of tables, plots and some fits, which should be easy for the reader to use and may enable him to estimate cross-sections for presently unmeasured energies. We have analyzed all the data published in the major Journals and Reviews for momenta of the incoming particles larger than ≅ 50 MeV/c, since the early days of elementary particle physics and, for each reaction, we have selected the best cross-section data available. We have restricted our attention to integrated cross-sections, such as total cross-sections, exclusive and inclusive cross-sections etc., at various incident beam energies. We have disregarded data affected by geometrical and/or kinematical cuts which would make them not directly comparable to other data at different energies. Also, in the case of exclusive reactions, we have left out data where not all of the particles in the final state were unambiguously identified. This work contains reactions induced by neutrinos, gammas, charged pions, kaons, nucleons, antinucleons and hyperons. (orig./HSI)

  11. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... is the best time to learn about the benefits of breastfeeding and make plans to give your baby a healthy start in life. Expand the sections below to watch videos about breastfeeding and ... href="https://www.youtube-nocookie.com/embed/ge-2Cn-LRAE">https://www.youtube- ...

  12. 42 CFR 422.384 - Financial plan requirement.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Financial plan requirement. 422.384 Section 422.384... (CONTINUED) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Provider-Sponsored Organizations § 422.384 Financial plan requirement. (a) General rule. At the time of application, an organization must submit a financial...

  13. Communication, knowledge, social network and family planning ...

    African Journals Online (AJOL)

    Family planning utilization in Tanzania is low. This study was cross sectional. It examined family planning use and socio demographic variables, social networks, knowledge and communication among the couples, whereby a stratified sample of 440 women of reproductive age (18-49), married or cohabiting was studied in ...

  14. Standard format and content for emergency plans for fuel cycle and materials facilities

    International Nuclear Information System (INIS)

    1990-09-01

    This regulatory guides is being developed to provide guidance acceptable to the NRC staff on the information to be included in emergency plans and to establish a format for presenting the information. Use of a standard format will help ensure uniformity and completeness in the preparation of emergency plans. An acceptable emergency plan should describe the licensed activities conducted at the facility and the types of accidents that might occur. It should provide information on classifying postulated accidents and the licensee's procedures for notifying and coordinating with offsite authorities. The plan should provide information on emergency response measures that might be necessary, the equipment and facilities available to respond to an emergency, and how the licensee will maintain emergency preparedness capability. It should describe the records and reports that will be maintained. There should also be a section on recovery after an accident and plans for restoring the facility to a safe condition. 4 refs

  15. DOE-owned spent nuclear fuel program plan

    International Nuclear Information System (INIS)

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines

  16. DOE-owned spent nuclear fuel program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  17. 29 CFR 2520.102-3 - Contents of summary plan description.

    Science.gov (United States)

    2010-07-01

    ... business of each trustee of the plan; (i) If a plan is maintained pursuant to one or more collective... Examine, without charge, at the plan administrator's office and at other specified locations, such as... 29 Labor 9 2010-07-01 2010-07-01 false Contents of summary plan description. 2520.102-3 Section...

  18. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  19. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  20. 3D base: a geometrical data base system for the analysis and visualisation of 3D-shapes obtained from parallel serial sections including three different geometrical representations

    NARCIS (Netherlands)

    Verbeek, F. J.; de Groot, M. M.; Huijsmans, D. P.; Lamers, W. H.; Young, I. T.

    1993-01-01

    In this paper we discuss a geometrical data base that includes three different geometrical representations of one and the same reconstructed 3D shape: the contour-pile, the voxel enumeration, and the triangulation of a surface. The data base is tailored for 3D shapes obtained from plan-parallel

  1. 40 CFR 52.274 - California air pollution emergency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false California air pollution emergency plan. 52.274 Section 52.274 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.274 California air pollution emergency plan. (a) Since the...

  2. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  3. Lesson Planning the Kodaly Way.

    Science.gov (United States)

    Boshkoff, Ruth

    1991-01-01

    Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)

  4. 29 CFR 780.616 - Operations included in raising livestock.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Operations included in raising livestock. 780.616 Section... Employment in Agriculture and Livestock Auction Operations Under the Section 13(b)(13) Exemption Requirements for Exemption § 780.616 Operations included in raising livestock. Raising livestock includes such...

  5. 29 CFR 1918.100 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... action plans. (a) Scope and application. This section requires all employers to develop and implement an... departments that can be contacted for further information or explanation of duties under the plan. (c) Alarm... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work...

  6. 12 CFR 917.5 - Strategic business plan.

    Science.gov (United States)

    2010-01-01

    ... reporting requirements and monitor implementation of the strategic business plan and the operating goals and... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Strategic business plan. 917.5 Section 917.5... POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.5 Strategic business...

  7. Method of radiation therapy treatment planning

    International Nuclear Information System (INIS)

    Hodes, L.

    1976-01-01

    A technique of radiation therapy treatment planning designed to allow the assignment of dosage limits directly to chosen points in the computer-displayed cross-section of the patient. These dosage limits are used as constraints in a linear programming attempt to solve for beam strengths, minimizing integral dosage. If a feasible plan exists, the optimized plan will be displayed for approval as an isodose pattern. If there is no feasible plan, the operator/therapist can designate some of the point dosage constraints as ''relaxed.'' Linear programming will then optimize for minimum deviation at the relaxed points. This process can be iterated and new points selected until an acceptable plan is realized. In this manner the plan is optimized for uniformity as well as overall low dosage. 6 claims, 6 drawing figures

  8. A report on the green plan consultations

    International Nuclear Information System (INIS)

    1990-08-01

    This document is a summary of what Canadians who participated in the consultations had to say about environmental issues and concerns; the solutions, roles and responsibilities, and priorities for action. It is based on detailed reports from 41 information sessions and 17 consultation workshops held across Canada. It is based on some 3,000 pages of comments and suggestions, an analysis of 4,500 question response forms, and written submissions from more than 1,000 individuals and organizations. The report is organized into two sections: improving decision making; and, action on environmental issues. The first section deals with science, education, enforcement, decision-making processes and partnerships. The second section deals with specific environmental issues identified in the consultation document, such as global warming and toxic substances, and other publicly identified issues, including energy and land use. Suggestions for further consideration represent possible policy, program and legislative elements of 'The Green Plan'. They are intended as a basis for a more focused debate which will help in the establishment of priorities

  9. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Hunter, S.W.; Gallegos, G.M.; Surano, K.A.; Lamson, K.C.; Tate, P.J.; Balke, B.K.; Biermann, A.H.; Hoppes, W.G.; Fields, B.C.; Gouveia, F.J.; Berger, R.L.; Miller, F.S.; Rueppel, D.W.; Sims, J.M.

    1992-04-01

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  10. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  11. Groundwater Protection Program Management Plan for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    2004-03-31

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

  12. Proposed Site Treatment Plan (PSTP). STP reference document

    International Nuclear Information System (INIS)

    1995-01-01

    The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site's mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP

  13. A Swedish co-operation programme for radiological emergency planning activities in the Baltic Sea region

    International Nuclear Information System (INIS)

    Petersson, B.

    1998-01-01

    Short overview of the Swedish cooperation projects with Baltic countries in the field of radiological emergency preparedness is presented. Cooperation programme is going since 1993 and is divided into following sections: sub-projects on planning, training and exercises, sub-projects on measurement strategies, including early warning systems, sub-project on information to the public and the media, sub-projects on review of the Ignalina NPP on-site emergency preparedness and planning of on-site rescue operations. Total budget amount allocated for these projects is 9 million Swedish crowns

  14. 30 CFR 77.107-1 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section... COAL MINES Qualified and Certified Persons § 77.107-1 Plans for training programs. Each operator must..., a program or plan setting forth what, when, how, and where the operator will train and retrain...

  15. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  16. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  17. The Best of Planning for Higher Education: An Anthology of Articles from the Premier Journal in Higher Education Planning.

    Science.gov (United States)

    Keller, George, Ed.

    This anthology contains selections from "Planning for Higher Education," the quarterly journal of the Society for College and University Planning. Following the preface, the second section, "Coming Changes in Academe," contains these articles: (1) "Designing Colleges for Greater Learning" (Ernest Pascarella and Patrick Terenzini, v20 n3); (2) "The…

  18. FDA (Food and Drug Administration) Compliance Program Guidance Manual (FY 88). Section 4. Medical and radiological devices

    International Nuclear Information System (INIS)

    1988-01-01

    The FDA Compliance Program Guidance Manual provides a system for issuing and filing program plans and instructions directed to Food and Drug Administration Field operations for project implementation. Section IV provides those chapters of the Compliance Program Guidance Manual which pertain to the areas of medical and radiological devices. Some of the areas of coverage include laser and sunlamp standards inspections, compliance testing of various radiation-emitting products such as television receivers and microwave ovens, emergency response planning and policy, premarket approval and device manufacturers inspections, device problem reporting, sterilization of devices, and consumer education programs on medical and radiological devices

  19. Finite element study of a HDR-RPV-section including a nozzle under thermal shock transient

    Energy Technology Data Exchange (ETDEWEB)

    Roos, E [Stuttgart Univ. (Germany); Katzenmeier, G [Forschungszentrum Juelich GmbH (Germany); Wanner, R; Mercier, O [Paul Scherrer Inst. (PSI), Villigen (Switzerland)

    1988-12-31

    This document presents a finite element study of a reactor pressure vessel section under thermal stresses. The strength properties of the vessel walls are studied as well as cracks due to the thermo-shock transient. (TEC). 6 refs.

  20. Species identification of Aspergillus section Flavi isolates from Portuguese almonds using phenotypic, including MALDI-TOF ICMS, and molecular approaches

    OpenAIRE

    Rodrigues, Paula; Venâncio, Armando; Lima, Nelson

    2011-01-01

    Section Flavi is one of the most significant Sections in the genus Aspergillus. Taxonomy of this section currently depends on multivariate approaches, entailing phenotypic and molecular traits. This work aimed to identify isolates from section Flavi by combining various classic phenotypic and genotypic methods as well as the novel approach based on spectral analysis by MALDI-TOF ICMS, and to evaluate the discriminatory power of the various approaches in species identification. Methods and ...