WorldWideScience

Sample records for plan include establishing

  1. Development and application of the methodology to establish life extension and modernization plan of aged hydropower plants

    International Nuclear Information System (INIS)

    Kim, Jong Sung; Kwon, Hyuck Cheon; Song, Byung Hun; Kwon, Chang Seop

    2009-01-01

    This paper provides how to establish an integrated plan for LE (Life Extension) and MD (MoDernization) of aged hydropower plants. The methodology is developed through review of overseas/domestic LE/MD histories, investigation of the previous overseas methodologies and consideration of domestic practices. The methodology includes reviews of the various factors such as condition, operation and maintenance history, up-to-date technology, and economic benefit. In order to establish the life extension/modernization plan, the methodology is applied to the domestic aged hydropower plants. Finally, priority rankings and draft practice plans for LE/MD are derived.

  2. 76 FR 5774 - Planning and Establishment of Consumer Operated and Oriented Plan Program; Request for Comments...

    Science.gov (United States)

    2011-02-02

    ...) of the Affordable Care Act directs the Secretary to establish a program to foster, through grants and... in feasibility studies, business plans, and marketing plans provided by prospective applicants before... are the advantages and disadvantages of a regional qualified nonprofit issuer or a regional federation...

  3. Diabetes Nutrition: Including Sweets in Your Meal Plan

    Science.gov (United States)

    Diabetes nutrition: Including sweets in your meal plan Diabetes nutrition focuses on healthy foods, but sweets aren't necessarily ... your meal plan. By Mayo Clinic Staff Diabetes nutrition focuses on healthy foods. But you can eat ...

  4. Establishing Sustainable Nuclear Education: Education Capability Assessment and Planning (ECAP) Assist Mission

    International Nuclear Information System (INIS)

    Ugbor, U.; Peddicord, K.; Dies, J.; Philip, B.; Artisyuk, V.

    2016-01-01

    Full text: The development of nuclear education, science and technology programmes is affected by the national context including national needs and capacities. The role and expectations for nuclear education and training might be different in technically matured countries, from countries where the technology is emerging. In this regard, particularly in developing countries, there is a need to balance nuclear education and training between immediate critical issues of radiation safety or human health and longer-term priorities in agriculture or industry. These priorities may or may not include the nuclear energy option. This paper shows how the Education Capability Assessment and Planning (ECAP) Assist Mission can contribute towards establishing sustainable nuclear education, including highlighting the various activities of each phase of the ECAP Process. (author

  5. Establishing predictors for successfully planned endotracheal extubation.

    Science.gov (United States)

    Lai, Chih-Cheng; Chen, Chin-Ming; Chiang, Shyh-Ren; Liu, Wei-Lun; Weng, Shih-Feng; Sung, Mei-I; Hsing, Shu-Chen; Cheng, Kuo-Chen

    2016-10-01

    The aim of this study was to establish predictors for successfully planned extubation, which can be followed by medical personnel. The patients who were admitted to the adult intensive care unit of a tertiary hospital and met the following criteria between January 2005 and December 2014 were collected retrospectively: intubation > 48 hours; and candidate for extubation. The patient characteristics, including disease severity, rapid shallow breath index (RSBI), maximal inspiratory pressure (MIP), maximal expiratory pressure (MEP), cuff leak test (CLT) before extubation, and outcome, were recorded. The CLT was classified as 2+ with audible flow without a stethoscope, 1+ with audible flow using a stethoscope, and negative (N) with no audible flow, even with a stethoscope. Failure to extubate was defined as reintubation within 48 hours. In total, 6583 patients were enrolled and 403 patients (6.1%) had extubation failures. Male patients dominated the patient cohort (4261 [64.7%]). The mean age was 64.5±16.3 years. The overall in-hospital mortality rate was 11.3%. The extubation failure rate for females was greater than males (7.7% vs 5.3%, P respiratory capacity, was developed to better predict extubation success.

  6. Defense Forensics: Additional Planning and Oversight Needed to Establish an Enduring Expeditionary Forensic Capability

    Science.gov (United States)

    2013-06-01

    forensic pathology, forensic anthropology, and forensic toxicology . 13DOD’s forensic directive defines DOD components as the Office of the...DEFENSE FORENSICS Additional Planning and Oversight Needed to Establish an Enduring Expeditionary Forensic ...COVERED 00-00-2013 to 00-00-2013 4. TITLE AND SUBTITLE Defense Forensics : Additional Planning and Oversight Needed to Establish an Enduring

  7. Planning Report for Establishment and Management of IAEA Designated International Cooperation Center

    International Nuclear Information System (INIS)

    Byun, Myung Woo; Jo, Cheol Hun; Noh, Yong Chang

    2006-05-01

    Establishment of research infrastructure and assistant of industry renovation is needed to achieve technology level-up in the all industry areas including plant engineering, material engineering, polymers, nondestructive tests, radioisotope tracer application, environment engineering, medical science, agriculture, sterilization, sprouting, biotechnology and aerospace, which would be the core motivation of our future industry. Early settlement of research environment is needed for the new RT-specialized national institute, Advanced Radiation Technology Institute (ARTi) in Jeongup, Chonbuk, Korea. From the early settlement, development of user program, technical assistance, and trendy information can be rapidly initiated by an industry-university-institute network. As a result, a RT hub in the northeast Asia will be founded with upgrade of international level of Korea. For this purpose, an intensive system construction is demanded. Establishment of a basic and advanced analysis system should be set up to analyze and evaluate the research products scientifically and industrially produced by using the RT-based research facilities. Establishment of a collaboration network in R and D among industry, university and institutes related to RT or RFT as well as development of an advanced RT industry system is demanded for the assistance of technology transfer. From the clarification of project details, comparisons of domestic/international technology levels and the demand of project in technical and economical aspects, and the prospect of development tendency of related technology, it is expected the effect and possible utilization after completion of the project. Especially, we proposed the direction for development of IAEA appointed international cooperation center with a long term development plan for the national radiation technology. This project report was consistently prepared with a long term development plan and consisted of establishments of training system for

  8. 77 FR 36579 - Establishing Indicators to Determine Whether State Plan Operations Are at Least as Effective as...

    Science.gov (United States)

    2012-06-19

    ...] Establishing Indicators to Determine Whether State Plan Operations Are at Least as Effective as Federal OSHA... establishing definitions and measures to determine whether OSHA-approved State Plans for occupational safety and health (State Plans) are at least as effective as the Federal OSHA program as required by the...

  9. 30 CFR 250.110 - What must I include in my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I include in my welding plan? 250.110... must I include in my welding plan? You must include all of the following in the Welding Plan that you... qualified personnel weld; (c) Practices and procedures for safe welding that address: (1) Welding in...

  10. 77 FR 3635 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-01-25

    ...-208; Report No. 2945] Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support et al... applicability. Subject: Connect America Fund: A National Broadband Plan for Our Future; Establishing Just and...

  11. Identifying Factors Influencing the Establishment of a Health System Reform Plan in Iran's Public Hospitals

    Directory of Open Access Journals (Sweden)

    Rasul Fani khiavi

    2016-09-01

    Full Text Available In today's world, health views have found a wider perspective in which non-medical expectations are particularly catered to. The health system reform plan seeks to improve society's health, decrease treatment costs, and increase patient satisfaction. This study investigated factors affecting the successful establishment of a health system reform plan. A mixed qualitative – quantitative approach was applied to conduct to explore influential factors associated with the establishment of a health system reform plan in Iran's public hospitals. The health systems and approaches to improving them in other countries have been studied. A Likert-based five-point questionnaire was the measurement instrument, and its content validity based on content validity ratio (CVR was 0.87. The construct validity, calculated using the factorial analysis and Kaiser Mayer Olkin (KMO techniques, was 0.964, which is a high level and suggests a correlation between the scale items. To complete the questionnaire, 185 experts, specialists, and executives of Iran’s health reform plan were selected using the Purposive Stratified Non Random Sampling and snowball methods. The data was then analyzed using exploratory factorial analysis and SPSS and LISREL software applications. The results of this research imply the existence of a pattern with a significant and direct relationship between the identified independent variables and the dependent variable of the establishment of a health system reform plan. The most important indices of establishing a health system reform plan, in the order of priority, were political support; suitable proportion and coverage of services presented in the society; management of resources; existence of necessary infrastructures; commitment of senior managers; constant planning, monitoring, and evaluation; and presentation of feedback to the plan's executives, intrasector/extrasector cooperation, and the plan’s guiding committee. Considering the

  12. Advanced methodology for generation expansion planning including interconnected systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, M; Yokoyama, R; Yasuda, K [Tokyo Metropolitan Univ. (Japan); Sasaki, H [Hiroshima Univ. (Japan); Ogimoto, K [Electric Power Development Co. Ltd., Tokyo (Japan)

    1994-12-31

    This paper reviews advanced methodology for generation expansion planning including interconnected systems developed in Japan, putting focus on flexibility and efficiency in a practical application. First, criteria for evaluating flexibility of generation planning considering uncertainties are introduced. Secondly, the flexible generation mix problem is formulated as a multi-objective optimization with more than two objective functions. The multi-objective optimization problem is then transformed into a single objective problem by using the weighting method, to obtain the Pareto optimal solution, and solved by a dynamics programming technique. Thirdly, a new approach for electric generation expansion planning of interconnected systems is presented, based on the Benders Decomposition technique. That is, large scale generation problem constituted by the general economic load dispatch problem, and several sub problems which are composed of smaller scale isolated system generation expansion plans. Finally, the generation expansion plan solved by an artificial neural network is presented. In conclusion, the advantages and disadvantages of this method from the viewpoint of flexibility and applicability to practical generation expansion planning are presented. (author) 29 refs., 10 figs., 4 tabs.

  13. 40 CFR 60.3012 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ..., 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements.... The plan must identify any additional waste management measures and implement those measures the...

  14. 40 CFR 62.14590 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or... use of recyclable materials. The plan must identify any additional waste management measures, and the...

  15. 40 CFR 60.2630 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation... of recyclable materials. The plan must identify any additional waste management measures, and the...

  16. 76 FR 43237 - Patient Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan...

    Science.gov (United States)

    2011-07-20

    ... have a choice of health plans to fit their needs. Exchanges will give individuals and small businesses... Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan (CO-OP) Program... implement the Consumer Operated and Oriented Plan (CO-OP) program, which provides loans to foster the...

  17. 40 CFR 60.2901 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Analysis Waste Management Plan § 60.2901 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements such as... must identify any additional waste management measures and implement those measures the source...

  18. A pre-feasibility case study on integrated resource planning including renewables

    International Nuclear Information System (INIS)

    Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.

    2008-01-01

    In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables

  19. Marketing plan for establishment of a sport shop with sport accesories sale and additional services

    OpenAIRE

    Trakalová, Aneta

    2011-01-01

    Purpose of bachelor study is marketing plan for establishment of a sport shop with sport accesories sale and additional services. Suggested marketing process will respect supply and competition analysis and individual target groups trends of prospective customers. Lay-out of target market is oriented on marketing strategy and financial plan forming.

  20. 27 September 1991-Royal Order establishing an emergency plan for nuclear risks on Belgian territory

    International Nuclear Information System (INIS)

    1992-01-01

    This emergency plan is to serve as guidance for the protection measures to be taken whenever necessary. It establishes the duties of the different services and bodies, in accordance with their responsibilities under the national laws and regulations. The plan, which describes the general organisation, must be supplemented by intervention plans at the different action levels: by the provincial authorities, the communal authorities and the various services and institutions concerned. This plan mainly concerns large nuclear installations and transport of nuclear fuels and radioactive materials; however, lower risks from other activities are also covered. (NEA)

  1. 12 CFR 563b.105 - What information must I include in my business plan?

    Science.gov (United States)

    2010-01-01

    ... information must I include in my business plan? (a) Prior to filing an application for conversion, you must adopt a business plan reflecting your intended plans for deployment of the proposed conversion proceeds. Your business plan is required, under § 563b.150, to be included in your conversion application. At a...

  2. 77 FR 60319 - Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a...

    Science.gov (United States)

    2012-10-03

    ...-XC099 Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a... Atmospheric Administration (NOAA), Commerce. ACTION: Establishment of the Coastal Gulf of Maine Closure Area... Service (NMFS) announces the establishment of the Coastal Gulf of Maine Closure Area under the Harbor...

  3. Getting to the core: establishing a business plan for a new company

    International Nuclear Information System (INIS)

    DeBoni, W.

    1998-01-01

    The challenge of establishing a distinctive strategy for a new Canadian oil and gas company was discussed. In Calgary alone, there are about 500 companies trying to establish a fundamental business plan which is distinctive and superior to their competitors. A newly established company, such as Bow Valley Energy Ltd., has the advantage of starting with a clean slate. The questions that should be considered when establishing a business plan for a new company were cited as: (1) where should the company be focused geographically? (2) should exploration or development be pursued? and (3) how can value be added to each deal? It was noted that 50 per cent of the discovered petroleum reserves are located in the Middle East and Africa. Since 70 per cent of the remaining reserves are also located in these areas, it makes sense that a prime decision factor would be to focus on those regions of the world where most of the oil is located. However, it is imperative that in reorienting efforts towards those regions issues of fiscal regime and the political stability of these areas are also addressed. It was suggested that having the ability to recognize opportunities and act quickly to capitalize on them, management and operational skills to operate marginal fields profitably, and ability to efficiently manage late-life fields to extract a maximum amount of oil at a low cost, will be the most important assets for a new company to succeed. Focusing efforts in areas with proven, low-cost reserves potential would also be important in the current oil pricing environment. 2 figs

  4. Establishment of a solar utilisation plan

    International Nuclear Information System (INIS)

    Gernhardt, D.; Mohr, M.; Unger, H.

    1992-01-01

    One of the main bases of the project ''Analysis of Possibilities of Solar Power Supply in Nordrhein-Westfalen and its Development until 2020'' is the achievement of a solar surface utilization plan. The duty of this plan is to indicate usefull areas for solar application in Nordrhein-Westfalen. This report shows the task of the solar surface utilization plan and explains attributes to describe surfaces for solar applications. (orig.) [de

  5. What to include in your birth plan

    Science.gov (United States)

    Pregnancy - birth plan ... Birth plans are guides that parents-to-be make to help their health care providers best support them during ... things to consider before you make a birth plan. This is a great time to learn about ...

  6. Prospective study establishing a management plan for impacted third molar in patients undergoing hematopoietic stem cell transplantation

    OpenAIRE

    Yamagata, Kenji; Onizawa, Kojiro; Yanagawa, Toru; Takeuchi, Yasutoshi; Hasegawa, Yuichi; Chiba, Shigeru; Bukawa, Hiroki

    2011-01-01

    ObjectiveAlthough dental treatment before hematopoietic stem cell transplantation (HSCT) is essential to prevent serious infections from oral sources, the best management plan for impacted third molar (ITM) is unclear.Study designThis study was planned to establish a management plan for ITM. Eighty-four candidates for HSCT therapy were consecutively enrolled in the prospective trial. The management plan, which was evidence based and prospectively decided, was to extract the symptomatic ITMs a...

  7. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    International Nuclear Information System (INIS)

    McGowan, S E; Albertini, F; Lomax, A J; Thomas, S J

    2015-01-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties. (paper)

  8. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    Science.gov (United States)

    McGowan, S. E.; Albertini, F.; Thomas, S. J.; Lomax, A. J.

    2015-04-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties.

  9. Business plan to establish a CT colonography service.

    Science.gov (United States)

    Fajardo, Laurie L; Hurley, James P; Brown, Bruce P; Summers, Robert W; McDaniel, R Donald

    2006-03-01

    The authors describe the University of Iowa Department of Radiology's business planning process to initiate a new service in computed tomographic colonography (CTC). Also known as virtual colonoscopy, CTC is a noninvasive technology that offers less risk, and potentially similar sensitivity and specificity, than conventional optical colonoscopy (OC). Although not currently covered by all insurance payers, about a year ago, the Centers for Medicare and Medicaid Services instituted temporary Current Procedural Terminology codes (Category III) for CTC. In locales where the procedure is not covered by insurers, it is likely to be sought by patients willing to pay out of pocket to undergo noninvasive cancer screening as an alternative to OC. Thus, CTC could become the preferred method of colon cancer surveillance by insurance providers in the near future. In developing the business plan, the authors reviewed pertinent scientific and clinical data to evaluate the need for and efficacy of CTC. Local market data were used to estimate patient and procedure volumes and utilization. The authors modeled financial expectations with respect to return on investment on the basis of recently reported models specific to CTC, resource requirements, and the operational impact of the new service on existing hospital and departmental clinical functions. Because there are few local providers of CTC in the authors' region, the business plan also included a publicity campaign and plan to market the new service, stimulate general public interest early, and differentiate the program as a leader in applying this unique new technology to promote cancer screening. Finally, the planning committee acknowledged and accommodated needs specific to the missions of an academic medical center with respect to research and education in designing the new service.

  10. 10 CFR 719.10 - What information must be included in the legal management plan?

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  11. 40 CFR 60.2065 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Management Plan § 60.2065 What should I include in my waste management plan? A waste management plan must... additional waste management measures and implement those measures the source considers practical and feasible, considering the effectiveness of waste management measures already in place, the costs of additional measures...

  12. 25 CFR 170.411 - What may a long-range transportation plan include?

    Science.gov (United States)

    2010-04-01

    ...) Social and economic development planning to identify transportation improvements or needs to accommodate... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN...

  13. 12 CFR 516.20 - What information must I include in my draft business plan?

    Science.gov (United States)

    2010-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  14. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    Science.gov (United States)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  15. Significance of preoperative planning software for puncture and channel establishment in percutaneous endoscopic lumbar DISCECTOMY: A study of 40 cases.

    Science.gov (United States)

    Hu, Zhouyang; Li, Xinhua; Cui, Jian; He, Xiaobo; Li, Cong; Han, Yingchao; Pan, Jie; Yang, Mingjie; Tan, Jun; Li, Lijun

    2017-05-01

    Preoperative planning software has been widely used in many other minimally invasive surgeries, but there is a lack of information describing the clinical benefits of existing software applied in percutaneous endoscopic lumbar discectomy (PELD). This study aimed to compare the clinical efficacy of preoperative planning software in puncture and channel establishment of PELD with routine methods in treating lumbar disc herniation (LDH). From June 2016 to October 2016, 40 patients who had single L4/5 or L5/S1 disc herniation were divided into two groups. Group A adopted planning software for preoperative puncture simulation while Group B took routine cases discussion for making puncture plans. The channel establishment time, operative time, fluoroscopic times and complications were compared between the two groups. The surgical efficacy was evaluated according to the Visual Analogue Scale (VAS), Oswestry Disability Index (ODI) and modified Macnab's criteria. The mean channel establishment time was 25.1 ± 4.2 min and 34.6 ± 5.4 min in Group A and B, respectively (P  0.05). The findings of modified Macnab's criteria at each follow-up also showed no significant differences (P > 0.05). The application of preoperative planning software in puncture and cannula insertion planning in PELD was easy and reliable, and could reduce the channel establishment time, operative time and fluoroscopic times of PELD significantly. Copyright © 2017 IJS Publishing Group Ltd. Published by Elsevier Ltd. All rights reserved.

  16. Preparing Soil for Turfgrass Establishment - Southern Utah

    OpenAIRE

    Caron, Michael; Schaible, Candace; Heflebower, Rick; Cardon, Grant; Beddes, Taun; Kopp, Kelly

    2017-01-01

    This fact sheet provides information for successfully establishing a lawn including planning, soil preparation, appropriate seed or sod choice, and an understanding of turfgrass requirements in southern Utah.

  17. 77 FR 36406 - Connect America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-06-19

    ... America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support; Correction AGENCY: Federal Communications...

  18. Rac1 signaling in the establishment of the fucoid algal body plan

    Directory of Open Access Journals (Sweden)

    Whitney E Hable

    2014-12-01

    Full Text Available Fucoid zygotes use environmental vectors, including sunlight, to initiate a growth axis a few hours after fertilization. The first division is then transversely oriented by the growth axis, producing daughter cells of distinct fates. The tip growing rhizoid cell gives rise to the holdfast, anchoring the alga to the intertidal substratum, while the opposite thallus cell mainly generates the photosynthetic and reproductive stipe and fronds. Elaboration of this simple growth axis thus establishes the basic body plan of the adult; and elucidating the mechanisms responsible for formation of the growth axis is paramount to understanding fucoid morphogenesis. Recent studies have culminated in a model whereby sunlight, and perhaps other environmental cues, activate the signaling protein Rac1 at the rhizoid pole. Here it sets in motion nucleation of a patch of actin filaments that in turn, targets ions, proteins and cellular processes to the future growth site. At germination, Rac1 initiates morphogenesis by inducing transformation of the patch of actin filaments to a structure that delivers vesicles to the growing tip, and a few hours later orients the spindle and cytokinetic plate.

  19. White plan and crisis management. Help guide for the elaboration of extended white plans and of white plans for health establishments. Issue 2006, appendix to circular nr DHOS/CGR/2006/401 of 2006 September 14

    International Nuclear Information System (INIS)

    2006-01-01

    White plans are specific emergency plans to be implemented in public and private health establishments. While introducing necessary modifications and taking public health policy effects into account, this document first defines crises and their management (levels of intervention from the local to the national level, typology of emergency plans, emergency medical chain, extended white plans). The second part proposes a set of sheets which aim to be a support in the elaboration of the extended white plan and of the white plan. The third part, based on professional contributions and lessons learned, addresses two important issues: firstly, the crisis management exercise, and secondly the hospital under tension and white plan triggering thresholds

  20. The Possibility Of Using The Business Model Canvas In The Establishment Of An Operator' S Business Plan

    Directory of Open Access Journals (Sweden)

    Andrzej Tokarski

    2017-12-01

    The objective of the paper is to present both theoretical and practical possibilities of using the BMC in creating a business plan of an economic entity, which is a useful tool used especially by micro and small economic entities at the stage of establishing a business activity and a business model popular among product managers. The paper was written based on the literature of the subject of management and business plans creation.

  1. Planning report for establishment of research infrastructure for national advanced radiation technology

    International Nuclear Information System (INIS)

    Kuk, Il Hyun; Byun, Myung Woo; Lee, Ju Woon

    2005-04-01

    Establishment of research infrastructure and assistant of industry renovation is needed to achieve technology level-up in the all industry areas including plant engineering, material engineering, polymers, nondestructive tests, radioisotope tracer application, environment engineering, medical science, agriculture, sterilization, sprouting, biotechnology and aerospace, which would be the core motivation of our future industry. Especially for early settlement of research environment for the new RT-specialized national institute, Advanced Radiation Technology Institute (ARTI) in Jeongup, Chonbuk, Korea is essential. For this purpose, an intensive system construction is demanded including: 1) Area of establishment of the system assisting radiation technology advancement: It is expected that radioisotope production for industrial or medical uses and activation of the related researches and training of experts by manufacture, installation, and operation of 30 MeV cyclotron. It also can be contributed in the promotion of national radiation related science and technology by establishment of a basic and advanced analysis system. 2) Area of establishment of training and education system of RT experts. 3) Area of establishment of a system for technological assistance for industry and industry-university-institute network. Contribution to balanced regional development and promotion of national RT-based science through establishment of RT industry cluster with Advanced Radiation Technology Institute (ARTi) at Jeongup as the center figure

  2. 77 FR 30903 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-05-24

    ... America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY: Federal Communications Commission. ACTION... of information collections associated with the Commission's; Connect America Fund; A National...

  3. 77 FR 35623 - Connect America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-06-14

    ... America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY: Federal Communications Commission. ACTION... Fund, Report and Order (Order). The Commission submitted revisions to this information collection under...

  4. The establishment of master plan for developing advanced I and C technology -The development of advanced instrumentation and control technology-

    International Nuclear Information System (INIS)

    Ham, Chang Shik; Lee, Byung Sun; Kwon, Kee Choon; Lee, Dong Young; Hwang, In Koo; Lee, Jang Soo; Kim, Jung Soo; Kim, Chang Hwoi; Jung, Chul Hwan; Na, Nan Ju; Dong, In Sook; Kang, Soon Gu; Lyu, Chan Ho; Song, Soon Ja

    1994-07-01

    Although several organizations are performing their tasks making efforts to develop new digital technology for application to existing nuclear power plants as well as new plants of the future, their projects are similar to each other and have possibilities of redundant investment. Therefore, KAERI have established a Master Plan to define the suitable work-scope of each Instrumentation and Control (I and C) development project and proceed its development items continuously. Furthermore, in the project, several kinds of advanced technology for application of computer science and digital electronics were studied to obtain better reliability of the I and C systems and reduce opertor's burden. For establishing the Master Plan, functions of I and C system of NPPs were surveyed. Especially EPRI URD was deeply analyzed for setting up a basis of the foreign countries were referred for the Master Plan. For the new technology survey, fault-tolerant control technology and control system performance analysis methods were studied. Requirements of alarm and information system as well as technology of I and C network system of NPPs were also established to introduce the advantages of commercial distributed control system. (Author)

  5. 77 FR 31647 - Establishing Indicators to Determine Whether State Plan Operations are At Least as Effective as...

    Science.gov (United States)

    2012-05-29

    ... working man and woman in the Nation safe and healthful working conditions * * *.'' The Act also encourages.... OSHA's mission is ``to assure safe and healthful working conditions for working men and women by... assessed the State Plans' progress toward achieving the performance goals established by their strategic...

  6. 78 FR 29655 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2013-05-21

    ... Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY: Federal Communications Commission. ACTION.... Subpart D--Universal Service Support for High Cost Areas 0 2. In Sec. 54.313, revise paragraph (a)(9...

  7. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... appropriate, a management plan that includes a proposed multiyear workplan. (b) At a minimum, this workplan...

  8. A study on the establishment of practical program for the RT promotion plan

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seong Yen; Jin, J. H.; Beyn, M. W.; Han, H. S.; Park, C.; Lee, J. W.; Yang, M. S.; Jeong, I. H.; Nho, Y. C

    2003-03-01

    The present state of RT utilizations in Korea is categorized into radioisotope applications to treat incurable diseases, food irradiation, and nondestructive test, and radiation applications by radiation generators such as cyclotrons to produce short half-life radioisotopes for medical uses and electron accelerators to make better products of cables and radial tiers. In order to activate more utilizations of RT, the followings should be carried out: 1. Establishment of RT Research Institute and RT Industrial Complex - Establishment of the tentatively named [Radiation Science and Technology Research Center] and 'Cyclotron Center' in four provinces should be effectively carried out as scheduled. - Successful pursuing design and construction of the proton accelerator for research and technology development, and CNS research facility. - Radiation area workers training participating the RT projects; Participation and training of university graduates to the on-going and planned RT projects, Classes for special skills and experts to radiation could be designed at the Consociated Graduate School, being established by joining national research organizations, if necessary. - Secure minimum number of R and D man power for RT development 2. Review design and construction of RI production reactor and construct distribution and transportation of RIs - Constructions of distribution lines and a central depository site with the establishment of Cyclotron Centers and RI production reactor - Designation, as early as possible, of the organization to handle the constructions of the distribution lines and the central depository site. 3. Establishment of an organization to appeal RT industries' concerns - An organization composed of governmental officials, researchers from national research institutes and/or private research institutes, representatives from associations and RT industries should be formed to define the issues to promote radiation uses. 4. Establishment of

  9. A study on the establishment of practical program for the RT promotion plan

    International Nuclear Information System (INIS)

    Kim, Seong Yen; Jin, J. H.; Beyn, M. W.; Han, H. S.; Park, C.; Lee, J. W.; Yang, M. S.; Jeong, I. H.; Nho, Y. C.

    2003-03-01

    The present state of RT utilizations in Korea is categorized into radioisotope applications to treat incurable diseases, food irradiation, and nondestructive test, and radiation applications by radiation generators such as cyclotrons to produce short half-life radioisotopes for medical uses and electron accelerators to make better products of cables and radial tiers. In order to activate more utilizations of RT, the followings should be carried out: 1. Establishment of RT Research Institute and RT Industrial Complex - Establishment of the tentatively named [Radiation Science and Technology Research Center] and 'Cyclotron Center' in four provinces should be effectively carried out as scheduled. - Successful pursuing design and construction of the proton accelerator for research and technology development, and CNS research facility. - Radiation area workers training participating the RT projects; Participation and training of university graduates to the on-going and planned RT projects, Classes for special skills and experts to radiation could be designed at the Consociated Graduate School, being established by joining national research organizations, if necessary. - Secure minimum number of R and D man power for RT development 2. Review design and construction of RI production reactor and construct distribution and transportation of RIs - Constructions of distribution lines and a central depository site with the establishment of Cyclotron Centers and RI production reactor - Designation, as early as possible, of the organization to handle the constructions of the distribution lines and the central depository site. 3. Establishment of an organization to appeal RT industries' concerns - An organization composed of governmental officials, researchers from national research institutes and/or private research institutes, representatives from associations and RT industries should be formed to define the issues to promote radiation uses. 4. Establishment of Pan-ministry PR

  10. Family planning in contermporary reproductive health and rights ...

    African Journals Online (AJOL)

    Key strategies to promote family planning include domestication of provisions of international conventions on family planning into state laws, and ensuring their implementation; development of community friendly family planning services; establishment of effective family planning commodities logistics management system; ...

  11. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  12. Prospective study establishing a management plan for impacted third molar in patients undergoing hematopoietic stem cell transplantation.

    Science.gov (United States)

    Yamagata, Kenji; Onizawa, Kojiro; Yanagawa, Toru; Takeuchi, Yasutoshi; Hasegawa, Yuichi; Chiba, Shigeru; Bukawa, Hiroki

    2011-02-01

    Although dental treatment before hematopoietic stem cell transplantation (HSCT) is essential to prevent serious infections from oral sources, the best management plan for impacted third molar (ITM) is unclear. This study was planned to establish a management plan for ITM. Eighty-four candidates for HSCT therapy were consecutively enrolled in the prospective trial. The management plan, which was evidence based and prospectively decided, was to extract the symptomatic ITMs and to leave the asymptomatic ones untreated, regardless of their impacted position. Eighty-seven ITMs were observed in 35 patients. The ITMs were in the maxilla of 25 patients and the mandible of 28 patients. Dental extraction of 7 teeth was performed in 6 patients without complications. All of the patients received the scheduled HSCT therapy and none experienced odontogenic infection while myelosuppressed. This management plan for ITM appears to be appropriate for pre-HSCT patients. Moreover, the experienced dental provider is suggested as a necessary and valuable part of the HSCT team. Crown Copyright © 2011. Published by Mosby, Inc. All rights reserved.

  13. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  14. Major issues on establishing an emergency plan in nuclear facilities

    International Nuclear Information System (INIS)

    Chen, Zhu-zhou

    1988-03-01

    Several major issues on emergency planning and preparation in nuclear facilities were discussed -- such as the importance of emergency planning and preparation, basic principles of intervention and implementation of emergency plan and emergency training and drills to insure the effectiveness of the emergency plan. It is emphasized that the major key point of emergency planning and response is to avoid the occurrence of serious nonrandom effect. 12 refs., 3 tabs

  15. Safety infrastructure for countries establishing their first research reactor

    International Nuclear Information System (INIS)

    Abou Yehia, H.; Shokr, A.M.

    2010-01-01

    Establishment of a research reactor is a major project requiring careful planning, preparation, implementation, and investment in time and human resources. The implementation of such a project requires establishment of sustainable infrastructures, including legal and regulatory, safety, technical, and economic. An analysis of the needs for a new research reactor facility should be performed including the development of a utilization plan and evaluation of site availability and suitability. All these elements should be covered by a feasibility study of the project. This paper discusses the elements of such a study with the main focus on the specific activities and steps for developing the necessary safety infrastructure. Progressive involvement of the main organizations in the project, and application of the IAEA Code of Conduct on the Safety of Research Reactors and IAEA Safety Standards in different phases of the project are presented and discussed. (author)

  16. Planning, design and technological criteria of conventional and nuclear shelters

    International Nuclear Information System (INIS)

    Sadoon, A.S.

    1989-01-01

    The thesis aims to establish a special criteria for building the shelters in two types. The conventional and nuclear, in respect to planning design and technological aspects, and finally establishing a special reference of planning, design and technology for Iraq which can be used when planning or designing a conventional or nuclear shelter. The thesis included four chapters, the first chapter included definition of shelters, and explanation of the effects of all types of weapons on buildings, and the second chapter included definition of planning and design concepts of shelters in its two types and analytical studies for international examples. The third chapter covered definition for technologies of structural, mechanical, electrical and sanitary systems. The fourth chapter included details of a case study in order to approach the results of research which included the conclusions, recommendations, criteria and prospects of planning design and technological aspects. 51 tabs.; 180 figs.; 32 refs.; 15 apps

  17. Planning of development strategy for establishment of advanced simulation of nuclear system

    International Nuclear Information System (INIS)

    Chung, Bubdong; Ko, Wonil; Kwon Junhyun

    2013-12-01

    In this product, the long term development plan in each technical area has been prosed with the plan of coupled code system. The consolidated code system for safety analysis has been proposing for future needs. The computing hardware needed for te advanced simulation is also proposing. The best approach for future safety analysis simulation capabilities may be a dual-path program. i. e. the development programs for an integrated analysis tool and multi-scale/multi-physic analysis tools, where the former aims at reducing uncertainty and the latter at enhancing accuracy. Integrated analysis tool with risk informed safety margin quantification It requires a significant extension of the phenomenological and geometric capabilities of existing reactor safety analysis software, capable of detailed simulations that reduce the uncertainties. Multi-scale, multi-physics analysis tools. Simplifications of complex phenomenological models and dependencies have been made in current safety analyses to accommodate computer hardware limitations. With the advent of modern computer hardware, these limitations may be removed to permit greater accuracy in representation of physical behavior of materials in design basis and beyond design basis conditions, and hence more accurate assessment of the true safety margins based on first principle methodology. The proposals can be utilized to develop the advanced simulation project and formulation of organization and establishment of high performance computing system in KAERI

  18. The Importance of Documenting and Including Traditional Wisdom in Community-Based Ecotourism Planning

    Directory of Open Access Journals (Sweden)

    Vesna Đukić

    2017-01-01

    Full Text Available This article accords to the theory of community-based tourism, which represents a concept that respects natural and cultural resources of a particular community and encourages participation of its members in the process of tourist product creation. The article operates in the planning phase and aims to give insights into the process of establishing the groundwork for community-based tourism. The key element is documenting and illustrating everything that could be a part of what is known as “traditional wisdom,” namely, the skills and knowledge of traditional life practices. The methods of case study, content analysis, and observation of the village of Omoljica, Serbia, were used. The positive aspect of this locality is reflected in the existing short-term initiatives of organizations and individuals engaging in preserving traditional practices, but without systematic, long-term planning and management of community-based tourism, these individual efforts to revalue traditional life practices would stay unrecognizable and invisible for visitors and stakeholders. Thus, the main goal of this article is to understand the relation between short-term bottom-up initiatives and long-term top-down strategic planning of specific ecotourism destinations, one that would embrace the traditional ways of rural community life. The contribution of this study, in addition to documenting and illustrating “traditional wisdom” of the specific rural community placed in the protected area which encompasses a particular local social system, will be reflected in the creation of a set of guidelines for sustainable, rural, community-based ecotourism as a soft-driver development of protected areas near big cities of the postsocialist countries.

  19. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Science.gov (United States)

    2010-04-01

    ... for the development, except for emergencies and essential non-routine maintenance necessary to... undertaken by the PHA in major work categories (e.g., kitchens, electrical systems, etc.); establishing...

  20. 42 CFR 417.155 - How the HMO option must be included in the health benefits plan.

    Science.gov (United States)

    2010-10-01

    ... printed materials that meet the requirements of § 417.124(b). (ii) Access may not be more restrictive or... benefits plan. 417.155 Section 417.155 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT... Organizations in Employee Health Benefits Plans § 417.155 How the HMO option must be included in the health...

  1. 41 CFR 102-37.150 - What must a State legislature include in the plan?

    Science.gov (United States)

    2010-07-01

    ... set forth in Appendix B of this part. It may also include in the plan other provisions not inconsistent with the purposes of title 40 of the United States Code and the requirements of this part. [67 FR...

  2. A study on the establishment of the national mid and long-term R and D plan for the nuclear technology

    International Nuclear Information System (INIS)

    Lee, Kang il; Oh, K. B.; Kim, S. W.; Won, B. C.; Park, S. G.; Kim, S. K.; Cho, S. G.; Kim, M. Y.; Jung, Y. H.

    1993-01-01

    The main objective of this study is to establish practice plan of them and to propose main R and D projects achieving the National Nuclear R and D target - becoming one of an advanced nuclear countries in the early 2000s. With this point of view, this study especially carried out the analysis of the Japanese long-term plans for nuclear power utilization and development. And we tried to propose main R and D projects with Nuclear Power Technology Relevance Tree. Also, the budget essential to the R and D plan for nuclear technology is estimated and the method to finance the budget for the next 10 years (1992-2001) has been considered in this study so as to make the national R and D plan more realistic. (Author)

  3. Environmental Assessment/Baseline Survey to Establish New Drop Zone (DZ) in Cadiz, Ohio

    Science.gov (United States)

    2009-03-01

    International Airport LATN Low Altitude Tactical Navigation MACA Military Airspace Collision Avoidance µg/m3 microgram per cubic meter MSL mean...Environmental Assessment and Baseline Survey 3-3 To Establish New Drop Zone in Cadiz, OH The 911 AW has a Military Airspace Collision Avoidance ( MACA ) plan...in Cadiz, OH The 911 AW flight safety would revise their existing MACA plan to include activities at the new drop zone. The MACA includes placing a

  4. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  5. Third World Experience of Education for Planning: Africa.

    Science.gov (United States)

    Tetteh, Austin

    1980-01-01

    Presented is an overview of the development of planning education at the undergraduate, graduate, and professional levels in Africa. Future needs include greater program flexibility and more help for developing countries to establish their own planning education programs. (WB)

  6. 45 CFR 286.75 - What must be included in the Tribal Family Assistance Plan?

    Science.gov (United States)

    2010-10-01

    ... description of the employment opportunities available, in both the public and private sector, within and near... eligibility criteria the Tribe has established, which includes a definition of “needy family,” including income and resource limits and the Tribe's definition of “Tribal member family” or “Indian family.” (2) A...

  7. 29 CFR 1608.4 - Establishing affirmative action plans.

    Science.gov (United States)

    2010-07-01

    ... taken pursuant to an affirmative action plan or program must be reasonable in relation to the problems... remedy the situation. Such steps, which in design and execution may be race, color, sex or ethnic...

  8. Establishment of the international collaboration and licensing preparation planning for the specific design of a prototype SFR

    International Nuclear Information System (INIS)

    Kim, Y. G.; Joo, H. K.; Cho, C. H.; Yoo, J. W.; Lee, D. U.; Ahn, K. S.; Hwang, Y. S.

    2013-05-01

    The conceptual design of prototype of Gen IV SFR (PGSFR) will be early determined through the review of the international experts. After this, the technology demonstration plan and validation of fuel design will be determined in more detail. The project will be accomplished efficiently by introducing the proven technology already validated from the international collaboration. The conceptual design and its requirements of PGSFR will be reviewed by ANL, who has a lot of design experiences in the metal fueled SFR development. The collaboration with ANL has been done through Work For Others (WFO) contract, and the MOU was signed between SFRA and Terra Power(USA), and SFRA and IGCAR. The licensing issues raised during PFBR and FBTR licensing in India will be discussed and reflected into the PGSFR design by inviting the high level expert from India, for example Dr. Chetal in IGCAR. The specific design, technology validation plan and fuel development plan will be established in more detail through the annual International Technical Review Meeting (ITRM) and experimental facilities available from the international institute and companies, which will be the basis for shortening the project period and to reduce the development cost

  9. Issues in Developing the IFSP: A Framework for Establishing Family Outcomes.

    Science.gov (United States)

    Beckman, Paula J.; Bristol, Marie M.

    1991-01-01

    This paper identifies four key issues in the implementation of Individualized Family Service Plans (IFSPs) to provide services to young handicapped children as required by Public Law 99-457. These include sensitivity to cultural diversity, family assessment, intrusiveness, and establishing family outcomes. A typology of family outcomes which…

  10. Learn More about EPA’s Plans to Establish Voluntary Criteria for Radon Credentialing Organizations

    Science.gov (United States)

    This page will provide the public with information on a Federal Register Notice of Intent to Establish Voluntary Criteria for Radon Credentialing Organizations.Topics covered include background and information on how to review and provide comments.

  11. Whooping crane recovery plan

    Science.gov (United States)

    Olsen, David L.; Blankenship, David R.; Irby, Harold D.; Erickson, Ray C.; Lock, Ross; Drewien, Roderick C.; Smith, Lawrence S.; Derrickson, Scott R.

    1980-01-01

    This plan has been prepared under the authority of the Endangered Species Act of 1973 and subsequent amendments. The Plan is designed to provide decision makers with an orderly set of events which, if carried out to a successful completion, will result in changing the status of the species from the endangered to the threatened level. It must be recognized that this Plan has been prepared 40 years after attempts to preserve the species began. As such, it covers events that have taken place, that are taking place, and that need to take place. The Plan, therefore, not only compiles in one place all whooping crane management and research efforts which are underway, but also proposes additional efforts needed for the recovery of the whooping crane. The Plan also establishes funding evels, time schedules, and priorities for each management and research effort.The Plan is organized into three parts. the first part includes an account of the whooping crane's history, biology, present status, and the factors believed to have resulted in its endangered status. Also included in this part is a synopsis of research and management activities that have taken place through 1978.The second part is a step-down pan wherein all existing and needed research and management efforts are organized into an orderly set of events. The prime objective is to move the whooping crane to non-endangered status. Minimum requirements for the attainment of this objective are the increase of the historical Wood Buffalo-Aransas population to at least 40 nesting pairs and the establishment of at least two additional, separate, and self-sustaining populations consisting of at least 20 nesting pairs each.the third part identifies the responsibility, time schedule, and cost for each element of the step-down plan.

  12. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  13. Teacher Attitudes on Including Students with Behavior Intervention Plans in a High-School Inclusive Classroom

    Science.gov (United States)

    Tucker, Thurman D.

    2017-01-01

    This research examined attitudes to determine factors influencing teachers' attitudes toward including students with behavior intervention plans in inclusive high-school classrooms. For Research Question 1 one-way ANOVAs analyzed quantitative data with no significant differences found and qualitative data discovered common patterns that BIPs are…

  14. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

  15. Establishing a sense of urgency for leading transformational change.

    Science.gov (United States)

    Shirey, Maria R

    2011-04-01

    This department highlights change management strategies that may be successful in strategically planning and executing organizational change initiatives. With the goal of presenting practical approaches helpful to nurse leaders advancing organizational change, content includes evidence-based projects, tools, and resources that mobilize and sustain organizational change initiatives. In this article, the author discusses successful tactics for establishing a sense of urgency to facilitate organizational change.

  16. Motivations and Barriers for Policymakers to Developing State Adaptation Plans

    Science.gov (United States)

    Miller, R.; Sylak-Glassman, E.

    2016-12-01

    Current approaches for developing high-quality adaptation plan require significant resources. In recent years, communities have grown to embrace adaptive plans across multiple forms, including adaptive capacity assessments, resilience strategies, and vulnerability assessments. Across the United States, as of this writing, 14 states have established adaptation plans, with another 8 states having begun the process. Given the high resources requirements and increasing interest in the development of adaptation plans, we aim to examine patterns behind the establishment of resilience plans at the state level. We examine demographic, financial, political, and physical characteristics associated with different states in an effort to explore the reasoning behind investing in the development of adaptation plans. This analysis considers quantitative and qualitative factors, including recent elections for political parties, politicians' climate-related statements and campaign promises, demographics, budgets, and regional climate threats. The analysis aims to identify motivations for state leadership taking action to develop adaptation plans. Results from the analysis seek to identify the primary drivers and barriers associated with state-wide resilience planning. These results could inform the design of scientific communication tools or approaches to aid future adaptation responses to climate change.

  17. Waste Minimization/Pollution Prevention Crosscut Plan, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This plan establishes a Department-wide goal to reduce total releases of toxic chemicals to the environment and off-site transfers of such toxic chemicals by 50 percent by December 31, 1999, in compliance with Executive Order 12856. Each site that meets the threshold quantities of toxic chemicals established in the Emergency Planning and Community Right-to-Know Act (EPCRA) will participate in this goal. In addition, each DOE site will establish site-specific goals to reduce generation of hazardous, radioactive, radioactive mixed, and sanitary wastes and pollutants, as applicable. Implementation of this plan will represent a major step toward the environmental risks and costs associated with DOE operations and increasing the Department's use of preventive environmental management practices. Investing in Waste Minimization Pollution Prevention (WMin/PP) steadily reduce hazardous and radioactive waste generation and will reduce the need for waste management and unnecessary expenditures for waste treatment, storage, and disposal. A preventive approach to waste management will help solve current environmental and regulatory issues and reduce the need for costly future corrective actions. The purpose of this plan is to establish the strategic framework for integrating WMin/PP into all DOE internal activities. This program includes setting DOE policy and goals for reducing the generation of wastes and pollutants, increasing recycling activities, and establishing an infrastructure to achieve and measure the goals throughout the DOE complex. Waste Minimization and Pollution Prevention Awareness Plans, submitted to Headquarters by DOE field sites, will incorporate the WMin/PP activities and goals outlined in this plan. Success of the DOE WMin/PP program is dependent upon each field operation becoming accountable for resources used, wastes and pollutants generated, and wastes recycled

  18. 34 CFR 364.42 - What objectives and information must be included in the State plan?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What objectives and information must be included in the State plan? 364.42 Section 364.42 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE...

  19. A study on the establishment of habitability requirement for enviromental laboratory in nuclear emergency

    International Nuclear Information System (INIS)

    Khang, Byung Oui

    2003-01-01

    The Establishment of the habitability requirement for Environmental Laboratory (EL) was required to decide the time of movement to a backup EL. The habitability criteria of the EL located inside plum pathway emergency planning zone was established including the alarm setpoint of the area radiation monitor based on the operational intervention level recommended by IAEA. The MDA of analysis equipments were established based on the generic action level recommended by IAEA. The countermeasures for the loss of habitability of EL was established by defined the emergency response activity at EL in nuclear emergency

  20. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  1. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP......-Terrestrial Plan/the Plan) as the framework for coordinated, long-term Arctic terrestrial biodiversity monitoring. The goal of the CBMP-Terrestrial Plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect, understand and report on long...

  2. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  3. Comparison of CT based-CTV plan and CT based-ICRU38 plan in brachytherapy planning of uterine cervix cancer

    International Nuclear Information System (INIS)

    Shim, Jin Sup; Jo, Jung Kun; Si, Chang Keun; Lee, Ki Ho; Lee, Du Hyun; Choi, Kye Suk

    2004-01-01

    Although Improve of CT, MRI Radio-diagnosis and Radiation Therapy Planing, but we still use ICRU38 Planning system(2D film-based) broadly. 3-Dimensional ICR plan(CT image based) is not only offer tumor and normal tissue dose but also support DVH information. On this study, we plan irradiation-goal dose on CTV(CTV plan) and irradiation-goal dose on ICRU 38 point(ICRU38 plan) by use CT image. And compare with tumor-dose, rectal-dose, bladder-dose on both planning, and analysis DVH Sample 11 patients who treated by Ir-192 HDR. After 40 Gy external radiation therapy, ICR plan established. All the patients carry out CT-image scanned by CT-simulator. And we use PLATO(Nucletron) v.14.2 planing system. We draw CTV, rectum, bladder on the CT image. And establish plan irradiation- dose on CTV(CTV plan) and irradiation- dose on A-point(ICRU38 plan) CTV volume(average±SD) is 21.8±26.6 cm 3 , rectum volume(average±SD) is 60.9±25.0 cm 3 , bladder volume(average±SD) is 116.1±40.1cm 3 sampled 11 patients. The volume including 100% dose is 126.7±18.9 cm 3 on ICRU plan and 98.2±74.5 cm 3 on CTV plan. On ICRU planning, the other one's 22.0 cm 3 CTV volume who residual tumor size excess 4cm is not including 100% isodose. 8 patient's 12.9±5.9 cm 3 tumor volume who residual tumor size below 4 cm irradiated 100% dose. Bladder dose(recommended by ICRU 38) is 90.1±21.3 % on ICRU plan, 68.7±26.6% on CTV plan, and rectal dose is 86.4±18.3%, 76.9±15.6%. Bladder and Rectum maximum dose is 137.2±5.9%, 101.1±41.8% on ICRU plan, 107.6±47.9%, 86.9±30.8% on CTV plan. Therefore CTV plan more less normal issue-irradiated dose than ICRU plan. But one patient case who residual tumor size excess 4 cm, Normal tissue dose more higher than critical dose remarkably on CTV plan. 80% over-Irradiated rectal dose(V80rec) is 1.8±2.4 cm 3 on ICRU plan, 0.7±1.0 cm 3 on CTV plan. 80% over-Irradiated bladder dose(V80bla) is 12.2%±8.9 cm 3 on ICRU plan, 3.5±4.1 cm 3 on CTV plan. Likewise, CTV

  4. 9 CFR 108.7 - Filing of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Filing of plot plans, blueprints, and... REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.7 Filing of plot plans, blueprints, and legends. Three copies of all plot plans, blueprints, and legends, including revisions, shall be submitted to Animal and Plant...

  5. A model for integrating strategic planning and competence-based curriculum design in establishing a public health programme: the UNC Charlotte experience

    Directory of Open Access Journals (Sweden)

    Harver Andrew

    2009-08-01

    Full Text Available Abstract Introduction The University of North Carolina at Charlotte, a doctoral/research-intensive university, is the largest institution of higher education in the Charlotte region. The university currently offers 18 doctoral, 62 master's and 90 baccalaureate programmes. Fall 2008 enrolment exceeded 23 300 students, including more than 4900 graduate students. The university's Department of Health Behavior and Administration was established on 1 July 2002 as part of a transformed College of Health & Human Services. Case description In 2003, the Department initiated a series of stakeholder activities as part of its strategic planning and programmatic realignment efforts. The Department followed an empirically derived top-down/bottom-up strategic planning process that fostered community engagement and coordination of efforts across institutional levels. This process culminated in a vision to transform the unit into a Council on Education for Public Health accredited programme in public health and, eventually, an accredited school of public health. To date, the Department has revised its Master of Science in health promotion into an Master of Science in Public Health programme, renamed itself the Department of Public Health Sciences, launched a Bachelor of Science in Public Health major, laid plans for a doctoral programme, and received accreditation from the Council on Education for Public Health as a public health programme. Furthermore, the campus has endorsed the programme's growth into a school of public health as one of its priorities. Discussion and Evaluation It is only through this rigorous and cyclical process of determining what society needs, designing a curriculum specifically to prepare graduates to meet those needs, ensuring that those graduates meet those needs, and reassessing society's needs that we can continue to advance the profession and ensure the public's health. Community stakeholders should be active contributors to

  6. A model for integrating strategic planning and competence-based curriculum design in establishing a public health programme: the UNC Charlotte experience.

    Science.gov (United States)

    Thompson, Michael E; Harver, Andrew; Eure, Marquis

    2009-08-11

    The University of North Carolina at Charlotte, a doctoral/research-intensive university, is the largest institution of higher education in the Charlotte region. The university currently offers 18 doctoral, 62 master's and 90 baccalaureate programmes. Fall 2008 enrolment exceeded 23,300 students, including more than 4900 graduate students. The university's Department of Health Behavior and Administration was established on 1 July 2002 as part of a transformed College of Health & Human Services. In 2003, the Department initiated a series of stakeholder activities as part of its strategic planning and programmatic realignment efforts. The Department followed an empirically derived top-down/bottom-up strategic planning process that fostered community engagement and coordination of efforts across institutional levels. This process culminated in a vision to transform the unit into a Council on Education for Public Health accredited programme in public health and, eventually, an accredited school of public health. To date, the Department has revised its Master of Science in health promotion into an Master of Science in Public Health programme, renamed itself the Department of Public Health Sciences, launched a Bachelor of Science in Public Health major, laid plans for a doctoral programme, and received accreditation from the Council on Education for Public Health as a public health programme. Furthermore, the campus has endorsed the programme's growth into a school of public health as one of its priorities. It is only through this rigorous and cyclical process of determining what society needs, designing a curriculum specifically to prepare graduates to meet those needs, ensuring that those graduates meet those needs, and reassessing society's needs that we can continue to advance the profession and ensure the public's health. Community stakeholders should be active contributors to programme innovation. Lessons learnt from this process include: being connected to your

  7. Including the public in pandemic planning: a deliberative approach

    Directory of Open Access Journals (Sweden)

    Braunack-Mayer Annette J

    2010-08-01

    Full Text Available Abstract Background Against a background of pandemic threat posed by SARS and avian H5N1 influenza, this study used deliberative forums to elucidate informed community perspectives on aspects of pandemic planning. Methods Two deliberative forums were carried out with members of the South Australian community. The forums were supported by a qualitative study with adults and youths, systematic reviews of the literature and the involvement of an extended group of academic experts and policy makers. The forum discussions were recorded with simultaneous transcription and analysed thematically. Results Participants allocated scarce resources of antiviral drugs and pandemic vaccine based on a desire to preserve society function in a time of crisis. Participants were divided on the acceptability of social distancing and quarantine measures. However, should such measures be adopted, they thought that reasonable financial, household and psychological support was essential. In addition, provided such support was present, the participants, in general, were willing to impose strict sanctions on those who violated quarantine and social distancing measures. Conclusions The recommendations from the forums suggest that the implementation of pandemic plans in a severe pandemic will be challenging, but not impossible. Implementation may be more successful if the public is engaged in pandemic planning before a pandemic, effective communication of key points is practiced before and during a pandemic and if judicious use is made of supportive measures to assist those in quarantine or affected by social isolation measures.

  8. A model for effective intergovernmental planning

    International Nuclear Information System (INIS)

    Moore, R.C.

    1991-01-01

    Effective intergovernmental planning processes are essential to the resolution of potential affects created by federal projects. Intergovernmental planning for the proposed Yucca Mountain High-level Nuclear Waste Repository has not been effective to date. In this paper, two successful planning efforts are described. The common elements of these processes are analyzed to provide a model that can be used for the resolution of impacts from other projects. Management authorities of the entities involved should establish a working group to conduct the intergovernmental planning. The parties must identify issues that can be resolved through intergovernmental planning. Clear management authority and direction to the staff participating the planning process is essential. Issues which cannot be resolved should not be included in the goals of the working group. Funding to support the planning process is essential

  9. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  10. Pharmacists’ Provision of Contraception: Established and Emerging Roles

    Directory of Open Access Journals (Sweden)

    Lindsey M Peters

    2016-10-01

    Full Text Available Pharmacists’ roles in provision of family planning products is expanding in the United States (U.S.. This article details established as well as emerging roles for U.S. pharmacists in the provision of contraception. These include helping patients develop reproductive life plans; dispensing prescription contraceptive products and counseling patients; assisting and educating patients with non-prescription contraceptive products, including emergency contraception; participating in collaborative practice agreements; administering contraception products; and making referrals and developing partnerships. The provision of contraception in the U.S. is dynamic, and pharmacists should continue to be aware of changes that will impact them professionally. As approximately 45% of pregnancies in the U.S. are unintended, through these roles pharmacists can impact an important public health priority. Conflict of Interest We declare no conflicts of interest or financial interests that the authors or members of their immediate families have in any product or service discussed in the manuscript, including grants (pending or received, employment, gifts, stock holdings or options, honoraria, consultancies, expert testimony, patents and royalties   Type: Idea Paper

  11. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  12. Establishment of a maintenance plan based on quantitative analysis in the context of RCM in a JIT production scenario

    International Nuclear Information System (INIS)

    Alebrant Mendes, Angélica; Duarte Ribeiro, José Luis

    2014-01-01

    This paper presents a quantitative method for supporting the preparation or review of an equipment maintenance plan in a Just-in-time production scenario. The proposed method includes the following steps: (i) identifying the parts that influence reliability; (ii) surveying the failure rates and times to repair the parts; (iii) classification of parts according to the effect of their failures; (iv) surveying the line occupation parameters; (v) identifying the probability distributions for time to failure, time to repair, and line occupation; (vi) simulating the production and maintenance using the Monte Carlo approach; (vii) conducting a sensitivity analysis concerning variations in demand, MTTF, and MTTR; and (viii) establishing optimized intervals for preventive maintenance. The method is illustrated through an application in a labeling and filling gallons line at a paints and dyes production company. This method allowed the identification of critical parts as it relates to the productive scenario in question. The results can support companies in their decision making regarding the need and/or type of maintenance investment that would best fit an expected demand scenario

  13. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  14. The NASA competitive placement plan for positions GS-15 and below (including trades and labor positions)

    Science.gov (United States)

    1993-01-01

    This plan provides the framework for selection based on merit from among the best qualified candidates available. Selections will be made without regard to political, religious, or labor organization affiliation or nonaffiliation, marital status, race, color, sex, national origin, nondisqualifying disability, or age. This plan does not guarantee promotion but rather ensures that all qualified available candidates receive fair and equitable consideration for positions filled under these competitive procedures. Announcing a vacancy under this plan is only one method of locating applicants for a position and can be used in conjunction with other methods. Subject to applicable law and regulation, selection of an individual to fill a position is the decision of management, as is the decision as to the method(s) to be used in identifying candidates. This plan is applicable to all NASA Installations. It covers all positions in the competitive service at (and below) the GS/GM-15 level (including all trades and labor positions), except positions in the Office of the Inspector General. The requirements herein are not intended to, nor should they be construed to limit in any way, the independent personnel authority of the Inspector General under the Inspector General Act, as Amended.

  15. 49 CFR Appendix C to Part 222 - Guide to Establishing Quiet Zones

    Science.gov (United States)

    2010-10-01

    ... authority. FRA believes that it will be very useful to include these organizations in the planning process... implementation process. This section also discusses Partial (e.g. night time only quiet zones) and Intermediate... provides four basic ways in which a quiet zone may be established. Creation of both New Quiet Zones and Pre...

  16. Smart meter implementation plan : report of the Board to the Minister

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides detailed information about Ontario's smart meter implementation plan. The smart metering system will measure how much electricity a customer uses on an hourly basis, with data being transferred daily to local electricity distributors. Energy prices will vary according to the time of day when energy was being consumed, a system that supports current methods of charging larger customers. The plan proposes that all new and existing customers in Ontario have some type of smart meter by 2010 as part of a two-phased plan. Customers will receive timely information on consumption, and distributors will offer variable pricing plans. It was advised that costs be included in the distribution rate immediately upon installation of smart meters. Detailed information on implementation, smart metering costs, minimum requirements, and non-commodity time of use rates were presented. Critical tasks for establishing a framework for implementation included: ministerial approval of the plan; identification of a program coordinator; the establishment of a correct regulatory framework; a vendor approval process requiring appropriate permissions for radio frequency licences; technology pilots on behalf of distributors to assure adequate adaptation and the development of procedures concerning procurement, internal schedules and deployment; coordination between government, regulatory bodies and distributors towards the establishment of communication strategies, implementation plans and distributor approaches. 5 tabs., 6 figs

  17. Update on Plans to Establish a National Phenology Network in the U.S.A.

    Science.gov (United States)

    Betancourt, J.; Schwartz, M.; Breshears, D.; Cayan, D.; Dettinger, M.; Inouye, D.; Post, E.; Reed, B.; Gray, S.

    2005-12-01

    The passing of the seasons is the most pervasive source of climatic and biological variability on Earth, yet phenological monitoring has been spotty worldwide. Formal phenological networks were recently established in Europe and Canada, and we are now following their lead in organizing a National Phenology Network (NPN) for the U.S.A. With support from federal agencies (NSF, USGS, NPS, USDA-FS, EPA, NOAA, NASA), on Aug. 22-26 we organized a workshop in Tucson, Arizona to begin planning a national-scale, multi-tiered phenological network. A prototype for a web-based NPN and preliminary workshop results are available at http://www.npn.uwm.edu. The main goals of NPN will be to: (1) facilitate thorough understanding of phenological phenomena, including causes and effects; (2) provide ground truthing to make the most of heavy public investment in remote sensing data; (3) allow detection and prediction of environmental change for a wide of variety of applications; (4) harness the power of mass participation and engage tens of thousands of "citizen scientists" in meeting national needs in Education, Health, Commerce, Natural Resources and Agriculture; (5) develop a model system for substantive collaboration across different levels of government, academia and the private sector. Just as the national networks of weather stations and stream gauges are critical for providing weather, climate and water-related information, NPN will help safeguard and procure goods and services that ecosystems provide. We expect that NPN will consist of a four-tiered, expandable structure: 1) a backbone network linked to existing weather stations, run by recruited public observers; 2) A smaller, second tier of intensive observations, run by scientists at established research sites; 3) a much larger network of observations made by citizen scientists; and 4) remote sensing observations that can be validated with surface observations, thereby providing wall-to-wall coverage for the U.S.A. Key to

  18. Maslow and Motherboards: Taking a Hierarchical View of Technology Planning.

    Science.gov (United States)

    Johnson, Doug

    2003-01-01

    Presents a planning model for educational uses of technology that is based on Maslow's hierarchy of needs. Topics include established infrastructure; effective administration; extensive resources; enhanced teaching, including creating distance learning opportunities; empowered students, including evaluation methods and information literacy skills;…

  19. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  20. 76 FR 67105 - Cash Balance Plans; Benefit Determinations and Plan Valuations for Statutory Hybrid Plans...

    Science.gov (United States)

    2011-10-31

    ... annuity conversion rate. Under PBGC's operating policy on cash balance plans (established pre-PPA 2006... pension equity plan that provides for the use of deferred annuity conversion factors (or an interest rate... annuity conversion plan that uses a variable interest rate to determine the amount of a benefit, PBGC...

  1. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  2. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  3. Implementation of a european directive establishing a negotiable CO2 emissions trading scheme

    International Nuclear Information System (INIS)

    Coussy, P.

    2003-01-01

    Approved on July 22, 2003, European Directive 87/2003/EC establishes a scheme for the trading of greenhouse gas emissions allowances. Before the market comes into effect on January 1, 2005, industrialists will have to account for a new financial asset in planning development strategy: the CO 2 allowance. Each Member State is currently developing a climate plan that includes the allocation of CO 2 emissions allowances to industrial installations. It will not be possible to exceed these allowances without incurring a financial penalty. (author)

  4. HOW TO INCLUDE KEY COMPETENCES IN THE COURSE PLAN

    OpenAIRE

    Benito García Peinado

    2009-01-01

    In our school we have decided to develop the teaching approaches to key competences through an organizational model that could be called "the model of the educational basic training". When suggesting new planning, we think that we must offer some solutions which start from the classroom routines and help us to choose the best aspects of these methods to improve them.

  5. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  6. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    Science.gov (United States)

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  7. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  8. Strategic Planning for Research Reactors

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA-TECDOC-1212 which primarily focused on enhancing the utilization of existing research reactors. This updated version also provides guidance on how to develop and implement a strategic plan for a new research reactor project and will be of particular interest for organizations which are preparing a feasibility study to establish such a new facility. This publication will enable managers to determine more accurately the actual and potential capabilities of an existing reactor, or the intended purpose and type of a new facility. At the same time, management will be able to match these capabilities to stakeholders/users’ needs and establish the strategy of meeting such needs. In addition, several annexes are presented, including some examples as clarification to the main text and ready-to-use templates as assistance to the team drafting a strategic plan.

  9. HOW TO INCLUDE KEY COMPETENCES IN THE COURSE PLAN

    Directory of Open Access Journals (Sweden)

    Benito García Peinado

    2009-04-01

    Full Text Available In our school we have decided to develop the teaching approaches to key competences through an organizational model that could be called "the model of the educational basic training". When suggesting new planning, we think that we must offer some solutions which start from the classroom routines and help us to choose the best aspects of these methods to improve them.

  10. Draft Transportaion Business Plan

    International Nuclear Information System (INIS)

    1985-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for establishing a transportation system to support shipment of spent fuel and high-level radioactive waste to repositories and storage facilities developed under the Nuclear Waste Policy Act of 1982 (NWPA). An element that assists in fulfilling that responsibility is a business plan for acquiring and operating a transportation system. The Draft Transportation Business Plan is an interim step in the process of procuring the transportation system. It sets the context for business strategy decisions by providing pertinent background information, describing the legislation and policies governing transportation under the NWPA, and with establishing the transportation system. It also serves as an instrument for initiating communication between OCRWM and other interested parties. Included in the docuument are strategies for procuring shipping casks and transportation support services. Additionally, in the spirit of the NWPA directive to utilize the private sector to the maximum extent possible, opportunities for business ventures are obvious throughout the system development cycle

  11. Hanford Waste Vitrification Plant applied technology plan

    International Nuclear Information System (INIS)

    Kruger, O.L.

    1990-09-01

    This Applied Technology Plan describes the process development, verification testing, equipment adaptation, and waste form qualification technical issues and plans for resolution to support the design, permitting, and operation of the Hanford Waste Vitrification Plant. The scope of this Plan includes work to be performed by the research and development contractor, Pacific Northwest Laboratory, other organizations within Westinghouse Hanford Company, universities and companies with glass technology expertise, and other US Department of Energy sites. All work described in this Plan is funded by the Hanford Waste Vitrification Plant Project and the relationship of this Plan to other waste management documents and issues is provided for background information. Work to performed under this Plan is divided into major areas that establish a reference process, develop an acceptable glass composition envelope, and demonstrate feed processing and glass production for the range of Hanford Waste Vitrification Plant feeds. Included in this work is the evaluation and verification testing of equipment and technology obtained from the Defense Waste Processing Facility, the West Valley Demonstration Project, foreign countries, and the Hanford Site. Development and verification of product and process models and other data needed for waste form qualification documentation are also included in this Plan. 21 refs., 4 figs., 33 tabs

  12. The Importance of a Business Plan when Planning a ...

    African Journals Online (AJOL)

    The Importance of a Business Plan when Planning a Lexicographical Project* ... It is, however, an important step towards the establishment of a dictionary project. The compilation of a dictionary ... AJOL African Journals Online. HOW TO USE ...

  13. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  14. Arizona TeleMedicine Network: Engineering Master Plan.

    Science.gov (United States)

    Atlantic Research Corp., Alexandria, VA.

    As the planning document for establishing a statewide health communications system initially servicing the Papago, San Carlos and White Mountain Apache, Navajo, and Hopi reservations, this document prescribes the communications services to be provided by the Arizona TeleMedicine Network. Specifications include: (1) communications services for each…

  15. Optimality of profit-including prices under ideal planning.

    Science.gov (United States)

    Samuelson, P A

    1973-07-01

    Although prices calculated by a constant percentage markup on all costs (nonlabor as well as direct-labor) are usually admitted to be more realistic for a competitive capitalistic model, the view is often expressed that, for optimal planning purposes, the "values" model of Marx's Capital, Volume I, is to be preferred. It is shown here that an optimal-control model that maximizes discounted social utility of consumption per capita and that ultimately approaches a steady state must ultimately have optimal pricing that involves equal rates of steady-state profit in all industries; and such optimal pricing will necessarily deviate from Marx's model of equal rates of surplus value (markups on direct-labor only) in all industries.

  16. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  17. Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide

    Science.gov (United States)

    Schlesinger, Adam

    2012-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  18. Oil spill contingency planning for offshore oil fields - a new concept established for the Norwegian continental shelf

    International Nuclear Information System (INIS)

    Singsaas, I.; Reed, M.; Nygaard, T.; Sundnes, G.Jr.

    1998-01-01

    The development of a new concept for oil spill contingency planning to be used for offshore oil fields on the Norwegian continental shelf was discussed. The factors which are important in developing a good oil spill contingency plan include a good understanding of: (1) the fate, behaviour and weathering of the specific oil, (2) relevant oil spill scenarios, (3) drift and spreading of the oil, and (4) specific requirements for the effectiveness of the chosen response options. The oil spill contingency and response (OSCAR) model was used for quantitative comparison of alternative response options. 21 refs., 2 tabs., 7 figs

  19. Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)

    International Nuclear Information System (INIS)

    1976-01-01

    The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development

  20. SADC establishes a regional action plan.

    Science.gov (United States)

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  1. Including the Consumer and Environment in Occupational Therapy Treatment Planning.

    Science.gov (United States)

    Brown, Catana; Bowen, Robin E.

    1998-01-01

    Occupational therapists (n=29) completed treatment plans based on case study data. Analysis indicated they often identified goals not addressed by the consumer/client. They significantly selected more simulated than real activities and more activities designed to change the person rather than the environment. (SK)

  2. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  3. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  4. Case study of establishing a clean production

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Kun; Nam, Yoon Mi [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    This study was implemented to derive suggestions for improving policies in Korea through the examination and analysis on the present policies related to the clean production and its establishment in enterprises. The characters of concept on clean production presented in pollution prevention, waste minimization, zero emission, environmental friendly design, and industrial ecology were analyzed and the mechanism for implementing clean production and government policy were arranged comprehensively. The related policies of major countries with international organizations including UNEP (United Nations Environment Program) and EU (European Union) were reviewed and compared to those of Korea to propose future policy plan. 73 refs., 3 figs., 30 tabs.

  5. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  6. 29 CFR 778.214 - Benefit plans; including profit-sharing plans or trusts providing similar benefits.

    Science.gov (United States)

    2010-07-01

    ... fide plan for providing old age, retirement, life, accident, or health insurance or similar benefits... employee on account of severance of employment (or for any other reason) would not result in any increase... mechanics performing contract work subject to the Davis-Bacon Act and related statutes, the provisions of...

  7. Materials Characterization Center program plan

    International Nuclear Information System (INIS)

    Nelson, R.D.; Ross, W.A.; Hill, O.F.; Mendel, J.E.; Merz, M.D.; Turcotte, R.P.

    1980-03-01

    The Materials Characterization Center (MCC) has been established at Pacific Northwest Laboratory as part of the Materials Characterization Organization for providing an authoritative, referenceable basis for establishing nuclear waste material properties and test methods. The MCC will provide a data base that will include information on the components of the waste emplacement package - the spent fuel or processed waste form and the engineered barriers - and their interaction with each other and as affected by the environment. The MCC will plan materials testing, develop and document procedures, collect and analyze existing materials data, and conduct tests as necessary

  8. NASA strategic plan

    Science.gov (United States)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  9. A Cooperative Plan to Establish an Early Childhood Center for the Invention, Demonstration, and Evaluation of Innovative Practices in Early Childhood Education. Final Report.

    Science.gov (United States)

    Irondequoit Central School District 3, Rochester, NY.

    In 1968 an upstate New York School district, acting on behalf of nine school districts, planned and established an Early Childhood Center. This evaluative report of a 2-year demonstration preschool, modeled on the British Infant School, describes the open classroom arrangement and its effect on the center's children, teachers, and student…

  10. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ... to State and regional agencies. (2) Documentation of the State's project implementation capability, identifying and demonstrating the ability to implement the plan, including: (i) Established eligibility...) Demonstration that the State has the capability to effectively manage the HMGP as well as other mitigation grant...

  11. Self-management interventions including action plans for exacerbations versus usual care in patients with chronic obstructive pulmonary disease.

    Science.gov (United States)

    Lenferink, Anke; Brusse-Keizer, Marjolein; van der Valk, Paul Dlpm; Frith, Peter A; Zwerink, Marlies; Monninkhof, Evelyn M; van der Palen, Job; Effing, Tanja W

    2017-08-04

    Chronic Obstructive Pulmonary Disease (COPD) self-management interventions should be structured but personalised and often multi-component, with goals of motivating, engaging and supporting the patients to positively adapt their behaviour(s) and develop skills to better manage disease. Exacerbation action plans are considered to be a key component of COPD self-management interventions. Studies assessing these interventions show contradictory results. In this Cochrane Review, we compared the effectiveness of COPD self-management interventions that include action plans for acute exacerbations of COPD (AECOPD) with usual care. To evaluate the efficacy of COPD-specific self-management interventions that include an action plan for exacerbations of COPD compared with usual care in terms of health-related quality of life, respiratory-related hospital admissions and other health outcomes. We searched the Cochrane Airways Group Specialised Register of trials, trials registries, and the reference lists of included studies to May 2016. We included randomised controlled trials evaluating a self-management intervention for people with COPD published since 1995. To be eligible for inclusion, the self-management intervention included a written action plan for AECOPD and an iterative process between participant and healthcare provider(s) in which feedback was provided. We excluded disease management programmes classified as pulmonary rehabilitation or exercise classes offered in a hospital, at a rehabilitation centre, or in a community-based setting to avoid overlap with pulmonary rehabilitation as much as possible. Two review authors independently assessed trial quality and extracted data. We resolved disagreements by reaching consensus or by involving a third review author. Study authors were contacted to obtain additional information and missing outcome data where possible. When appropriate, study results were pooled using a random-effects modelling meta-analysis. The primary

  12. Comprehensive Evaluation of Large Infrastructure Project Plan with ANP

    Institute of Scientific and Technical Information of China (English)

    HAN Chuan-feng; CHEN Jian-ye

    2005-01-01

    Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.

  13. "Come to Chimera!" 1978: A Librarian's Planning Handbook.

    Science.gov (United States)

    Lukenbill, Shirley; Lesser, Anita

    This handbook, prepared to assist librarians in planning summer reading programs for children, includes suggestions on the following: (1) establishing program goals, objectives, and activities; (2) supplies, resources, and materials needed for the program; (3) sample registration, evaluation, and volunteer recruitment forms; (4) types of publicity…

  14. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  15. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  16. Ionospheric Response to Extremes in the Space Environment: Establishing Benchmarks for the Space Weather Action Plan.

    Science.gov (United States)

    Viereck, R. A.; Azeem, S. I.

    2017-12-01

    One of the goals of the National Space Weather Action Plan is to establish extreme event benchmarks. These benchmarks are estimates of environmental parameters that impact technologies and systems during extreme space weather events. Quantitative assessment of anticipated conditions during these extreme space weather event will enable operators and users of affected technologies to develop plans for mitigating space weather risks and improve preparedness. The ionosphere is one of the most important regions of space because so many applications either depend on ionospheric space weather for their operation (HF communication, over-the-horizon radars), or can be deleteriously affected by ionospheric conditions (e.g. GNSS navigation and timing, UHF satellite communications, synthetic aperture radar, HF communications). Since the processes that influence the ionosphere vary over time scales from seconds to years, it continues to be a challenge to adequately predict its behavior in many circumstances. Estimates with large uncertainties, in excess of 100%, may result in operators of impacted technologies over or under preparing for such events. The goal of the next phase of the benchmarking activity is to reduce these uncertainties. In this presentation, we will focus on the sources of uncertainty in the ionospheric response to extreme geomagnetic storms. We will then discuss various research efforts required to better understand the underlying processes of ionospheric variability and how the uncertainties in ionospheric response to extreme space weather could be reduced and the estimates improved.

  17. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  18. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  19. [Materiality Analysis of Health Plans Based on Stakeholder Engagement and the Issues Included at ISO 26000:2010].

    Science.gov (United States)

    Moyano Santiago, Miguel Angel; Rivera Lirio, Juana María

    2017-01-18

    Health plans of the Spanish autonomous communities can incorporate sustainable development criteria in its development. There have been no analysis or proposals about development and indicators. The goal is to add a contribution to help build better health plans aimed at sustainable development and help to manage economic, social and environmental impacts of health systems criteria. We used a variation of the RAND/UCLA or modified Delphi technique method. The process consisted of a bibliographical and context matters and issues related to health and social responsibility analysis based on ISO 26000: 2010. A survey by deliberately to a selection of 70 expert members of the identified stakeholders was carried out and a discussion group was held to determine the consensus on the issues addressed in the survey sample. The research was conducted in 2015. From the literature review 33 health issues included in ISO 26000:2010 were obtained. 7 survey proved relevant high consensus, 8 relevance and average consensus and 18 with less relevance and high level of dissent. The expert group excluded 4 of the 18 subjects with less consensus. 29 issues included 33 at work, divided into 7 subjects contained in the guide ISO 26000 of social responsibility, were relevant stakeholders regarding possible inclusion in health plans. Considering the direct relationship published by ISO (International Organization for Standardization) among the issues ISO 26000 and the economic, social and environmental indicators in GRI (Global Reporting Initiative) in its G4 version, a panel with monitoring indicators related to relevant issues were elaborated.

  20. Establishment of the Russian Safeguards Methodology and Training Centre

    International Nuclear Information System (INIS)

    Guardini, S.; Cuypers, M.; Frigola, P.; Gubanov, V.; Ryazanov, B.; Volodin, Y.

    1995-01-01

    The Russian Federation has recently decided to transform and reinforce its State System of Accountancy and Control (SSAC) of nuclear materials. At the basis of the new system, consistent with the example of other national or regional systems, a laboratory framework giving reference and traceability to international standards, methodological support and training is planned. This last point includes the establishment of laboratories and facilities designed for the development, calibration, evaluation of the performances and training in the proper use of measurement methods and containment and surveillance measures, which are the basis for the implementation of an objective and sound nuclear material accountancy and control system. These projects will have to be tailored to the requirements of the nuclear fuel cycle in the Russian Federation and may eventually also be of interest for other countries in the CIS. The European Commission, in the framework of the collaboration with the Russian Federation, has proposed and initiated projects oriented to supporting the above plans. One of these projects concerns the establishment of the Russian Methodological and Training Centre RMTC at the Institute of Physics and Power Engineering (IPPE) of OBNINSK, Kaluga Region, in the Russian Federation. This paper describes the main features of the RMTC project

  1. Experiences in manpower planning for geomatics

    Science.gov (United States)

    Fairbairn, D.

    2014-04-01

    This paper addresses the issue of manpower planning in meeting the needs of national and international economies for trained geomatics professionals. Estimated statistics for the numbers of such personnel, and experience in assessing recruitment into the profession reveal considerable skills gaps, particularly in the mature economies of the developed world. In general, centralised manpower planning has little official role in western economies. However, informal surveys of shortfalls in supply of qualified graduates in many fields, including geomatics, are undertaken by professional organisations, educational establishments and consultancies. This paper examines examples of such manpower surveys and considers whether more effective manpower planning would ensure a more efficient geomatics industry in a nation, and what the nature of such an exercise should be.

  2. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  3. Precision IORT - Image guided intraoperative radiation therapy (igIORT) using online treatment planning including tissue heterogeneity correction.

    Science.gov (United States)

    Schneider, Frank; Bludau, Frederic; Clausen, Sven; Fleckenstein, Jens; Obertacke, Udo; Wenz, Frederik

    2017-05-01

    To the present date, IORT has been eye and hand guided without treatment planning and tissue heterogeneity correction. This limits the precision of the application and the precise documentation of the location and the deposited dose in the tissue. Here we present a set-up where we use image guidance by intraoperative cone beam computed tomography (CBCT) for precise online Monte Carlo treatment planning including tissue heterogeneity correction. An IORT was performed during balloon kyphoplasty using a dedicated Needle Applicator. An intraoperative CBCT was registered with a pre-op CT. Treatment planning was performed in Radiance using a hybrid Monte Carlo algorithm simulating dose in homogeneous (MCwater) and heterogeneous medium (MChet). Dose distributions on CBCT and pre-op CT were compared with each other. Spinal cord and the metastasis doses were evaluated. The MCwater calculations showed a spherical dose distribution as expected. The minimum target dose for the MChet simulations on pre-op CT was increased by 40% while the maximum spinal cord dose was decreased by 35%. Due to the artefacts on the CBCT the comparison between MChet simulations on CBCT and pre-op CT showed differences up to 50% in dose. igIORT and online treatment planning improves the accuracy of IORT. However, the current set-up is limited by CT artefacts. Fusing an intraoperative CBCT with a pre-op CT allows the combination of an accurate dose calculation with the knowledge of the correct source/applicator position. This method can be also used for pre-operative treatment planning followed by image guided surgery. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  4. Countrywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Establishing the Baselines

    National Research Council Canada - National Science Library

    Schoeni, Robert

    2002-01-01

    ...) Plan on November 16,1999. The LTFSS Plan consists of 46 projects whose goal is to promote self-sufficiency among families that are participating in the California Work Opportunity and Responsibility to Kids (CalWORKs...

  5. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  6. Language Planning: Corpus Planning.

    Science.gov (United States)

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  7. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  8. British discretion in Dutch planning: establishing a comparative perspective for regional planning and local development in the Netherlands and the United Kingdom

    NARCIS (Netherlands)

    Janssen-Jansen, L.B.; Woltjer, J.

    2010-01-01

    Regional planning and development is continuing to take an important role in planning agendas throughout Europe. In the United Kingdom (UK), the planning system has been reformed during the last decades, marking a noticeable shift from a development-led towards a more plan-led system. In the

  9. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  10. Commercial Space Port Planning in Texas

    Science.gov (United States)

    Bell, L.; Looke, B.

    2002-01-01

    The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones

  11. Local government involvement in long term resource planning for community energy systems

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  12. Establishment of the Integrated Plant Data Warehouse

    International Nuclear Information System (INIS)

    Oota, Yoshimi; Yoshinaga, Toshiaki

    1999-01-01

    This paper presents 'The Establishment of the Integrated Plant Data Warehouse and Verification Tests on Inter-corporate Electronic Commerce based on the Data Warehouse (PDWH)', one of the 'Shared Infrastructure for the Electronic Commerce Consolidation Project', promoted by the Ministry of International Trade and Industry (MITI) through the Information-Technology Promotion Agency (IPA), Japan. A study group called Japan Plant EC (PlantEC) was organized to perform relevant activities. One of the main activities of plantEC involves the construction of the Integrated (including manufacturers, engineering companies, plant construction companies, and machinery and parts manufacturers, etc.) Data Warehouse which is an essential part of the infrastructure necessary for a system to share information on industrial life cycle ranging from planning/designing to operation/maintenance. Another activity is the utilization of this warehouse for the purpose of conducting verification tests to prove its usefulness. Through these verification tests, PlantEC will endeavor to establish a warehouse with standardized data which can be used for the infrastructure of EC in the process plant industry. (author)

  13. Establishment of the Integrated Plant Data Warehouse

    Energy Technology Data Exchange (ETDEWEB)

    Oota, Yoshimi; Yoshinaga, Toshiaki [Hitachi Works, Hitachi Ltd., hitachi, Ibaraki (Japan)

    1999-07-01

    This paper presents 'The Establishment of the Integrated Plant Data Warehouse and Verification Tests on Inter-corporate Electronic Commerce based on the Data Warehouse (PDWH)', one of the 'Shared Infrastructure for the Electronic Commerce Consolidation Project', promoted by the Ministry of International Trade and Industry (MITI) through the Information-Technology Promotion Agency (IPA), Japan. A study group called Japan Plant EC (PlantEC) was organized to perform relevant activities. One of the main activities of plantEC involves the construction of the Integrated (including manufacturers, engineering companies, plant construction companies, and machinery and parts manufacturers, etc.) Data Warehouse which is an essential part of the infrastructure necessary for a system to share information on industrial life cycle ranging from planning/designing to operation/maintenance. Another activity is the utilization of this warehouse for the purpose of conducting verification tests to prove its usefulness. Through these verification tests, PlantEC will endeavor to establish a warehouse with standardized data which can be used for the infrastructure of EC in the process plant industry. (author)

  14. Guide for the elaboration of plans to control emergencies

    International Nuclear Information System (INIS)

    1990-01-01

    This Venezuelan standard establishes the lines for the elaboration of plans to control emergencies. It includes general aspects for the control of any emergency originated by operational flaws, for the nature or for acts of third, in any industrial installation, working center, public or private building [es

  15. Spaceport Florida Authority: Business Plan

    Science.gov (United States)

    1996-01-01

    The Spaceport Florida Authority (SFA) was established under Florida Statute by the Governor and Legislature to assist the development of our nation's space transportation industry and to generate new space-related jobs, investment and opportunities statewide. Included in the Authorities' business plan is the statement of work and list of team members involved in creating the report, SFA's current operating concept, market analysis, assessment of accomplishments, a sample operating concept and a "roadmap to success".

  16. Chairside treatment of amelogenesis imperfecta, including establishment of a new vertical dimension with resin nanoceramic and intraoral scanning.

    Science.gov (United States)

    Zimmermann, Moritz; Koller, Christina; Hickel, Reinhard; Kühnisch, Jan

    2016-09-01

    Amelogenesis imperfecta is a hereditary disease affecting the structural development of tooth substance. This clinical report describes a 1-visit chairside treatment of an 8-year-old patient with amelogenesis imperfecta, using computer-aided design and computer-aided manufacturing (CAD-CAM) technology. Intraoral scanning was performed using the Cerec Omnicam. Thirteen resin nanoceramic crowns (Lava Ultimate) were fabricated chairside by using a Cerec MCXL milling unit and seated adhesively. The patient's treatment included establishing a new occlusal vertical dimension and new centric relationship. Reevaluation after 6 months showed a stable situation. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  17. Vegetation development and native species establishment in reclaimed coal mine lands in Alberta : directions for reclamation planning

    Energy Technology Data Exchange (ETDEWEB)

    Longman, P. [Calgary Univ., AB (Canada). Faculty of Environmental Design

    2010-07-01

    This paper discussed a study undertaken to evaluate reclamation vegetation at Coal Valley Mine in Alberta with respect to expected vegetation changes over time, establishing a successional model of vegetation development, and factors contributing to the observed patterns. Most of the expected vegetation trends were evident, including lower grass cover and height, lower legume cover, a higher degree of native plant species richness, and the establishment of woody species. Four vegetation communities (2 graminoid-dominated and 2 conifer-dominated) were identified in the study, for which a possible successional model was constructed. Vegetation dynamics for agronomic grasses, legumes, and tree cover were discussed. Areas with Lodgepole Pine were found to have higher species richness and cover. Concerns were raised that the identified trends may not in fact supply the expected opportunities for native species establishment. In order to facilitate the establishment of native species and better manage reclamation vegetation development, the author recommended that a conifer overstory be established to increase native richness and native cover, and that more appropriate seeding mixes be developed as certain agronomic species are detrimental to long-term goals. The author also recommended that site-specific seed mixes be developed according to end land-use goals, that a planting program for native plants and shrubs be developed, and that a monitoring program be established to better inform future reclamation efforts. The recommendations were designed to bring reclamation efforts into line with reclamation goals. 12 refs., 4 tabs., 2 figs.

  18. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  19. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  20. What Do We Fix First? A Step-by-Step Plan for an Inhouse Maintenance Audit of School Buildings.

    Science.gov (United States)

    Mutter, Davida W.; Nichols, W. Randolph

    1987-01-01

    Describes a planning process designed to (1) establish building maintenance priorities in a systematic and equitable manner, (2) include all knowledgable school system personnel in the process, and (3) develop a five-year building renewal plan. (MLF)

  1. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  2. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  3. Quality assurance (QA) training at Westinghouse including innovative approaches for achieving an effective QA programme and establishing constructive interaction

    International Nuclear Information System (INIS)

    Chivers, J.H.; Scanga, B.E.

    1982-01-01

    Experience of the Westinghouse Water Reactors Division with indoctrination and training of quality engineers includes training of personnel from Westinghouse divisions in the USA and overseas as well as of customers' personnel. A written plan is prepared for each trainee in order to fit the training to the individual's needs, and to cover the full range of information and activities. The trainee is also given work assignments, working closely with experienced quality engineers. He may prepare inspection plans and audit check lists, assist in the preparation of QA training modules, write procedures, and perform supplier surveillance and data analyses, or make special studies of operating systems. The trainee attends seminars and special courses on work-related technical subjects. Throughout the training period, emphasis is placed on inculcating an attitude of team work in the trainee so that the result of the training is the achievement of both quality and productivity. Certification is extended (given that education/experience/skill requirements are met) to such functions as mechanical equipment quality engineering, electrical equipment quality engineering, and start-up and testing quality engineering. A well-trained quality engineer is equipped to provide technical assistance to other disciplines and, through effective co-operation with others, contributes to the success of the organization's endeavours. (author)

  4. Interactive Energy Planning

    DEFF Research Database (Denmark)

    Blarke, Morten Boje

    2006-01-01

    Though it is being questioned whether planning theory should be fitted into neat typologies, some have described evolving planning theory as a journey away from ethnocentrism, through the lands of rationalism, pragmatism, socio-ecological idealism, political-economic mobilization, currently...... anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...

  5. CWTC Business Plan

    DEFF Research Database (Denmark)

    Jensen, Peter Hjuler; Hillestrøm, Adam; Markou, Helen

    level improving the competitive advantage of that industry. The CWTC will in itself operate its activities, including access to test and experimental facilities, on a semi commercial basis. The business model for the CWTC presented is based on revenues coming from component manufacturers as well......This report presents the Business Plan for the establishment of the Wind Turbine Component Centre (CWTC) to meet the objectives of performing theoretical research and experimental testing. The core idea of a CWTC is to support the Danish wind energy industry and research activities at the component...... suppliers to the Danish wind turbine industry and also the Danish research establishments. The presented organizational structure reflects that there are certain functions that are separated from the operations and it also reflects that scientific staffing are hired in on a project basis. Machine operators...

  6. Hanford site post-NPH building inspection plan

    International Nuclear Information System (INIS)

    Wagenblast, G.R. Westinghouse Hanford

    1996-01-01

    This plan establishes consistent post-NPH building inspection procedures and defines a procedure for prioritization of buildings for inspection to ensure the safety of facilities prior to reentry. Qualification of systems for restart of operation is not included. This plan takes advantage, where possible, of existing national procedures for post-NPH inspection of buildings, of existing structural design and evaluation documentation of Hanford facilities, and current and proposed seismic instrumentation located throughout the Hanford site. A list of buildings, prioritized according to current building safety function and building vulnerability (without regard for or information about a damaging natural forces event) is provided

  7. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  8. Establishment of nuclear knowledge-information base; development of courseware on introductory nuclear engineering and establishment of digital education platform

    Energy Technology Data Exchange (ETDEWEB)

    Song, Jong Soon; Na, Mang Yun; Lee, Goung Jin; Yang, Won Sik [Chosun University, Gwangju (Korea)

    2002-01-01

    In this research, there are two major tasks. The first one is a development of digital course-ware program for introductory nuclear engineering. For this task, a development of lecture note is followed by lecture Slide files in html file format, which is based on web. For this purpose, following activities were performed; collection of related materials. planning of overall courseware, writing of lecture note and exercise plan, and securing the computer programs and codes needed. The second task of this research is to plan and install several hardwares in a multimedia class room as a digital education platform. The platform includes smart board with touch screen functionality, network server and personal computers. The digital education platform was established as a multimedia class room in the 2nd College of Engineering building, room 16210 by using the Server-Client environment and smart board, personal computer, and internet was connected by a TCP/IP way. For the courseware, hypertext was supported to be web-based, and photo, picture, data and related web links including text were developed in a close relation, it is possible for students to study big amounts of information in a systemized way and to maximize the learning efficiency. The whole range of introductory nuclear engineering course was divided into nuclear fuel cycle, reactor theory, heat transport, and reactor control, and digital contents were developed by each experts, but the final format of the courseware was maintained consistently for easy understanding . Also, the reactor experiment courseware developed by Kyunghee University can be utilized on this platform. 5 refs., 36 figs., 4 tabs. (Author)

  9. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  10. Clinical audit of emergency unit before and after establishment of the emergency medicine department.

    Science.gov (United States)

    Amini, Afshin; Dindoost, Payam; Moghimi, Mehrdad; Kariman, Hamid; Shahrami, Ali; Dolatabadi, Ali Arhami; Ali-Mohammadi, Hossein; Alavai-Moghaddam, Mostafa; Derakhshanfar, Hojjat; Hatamabadi, HamidReza; Heidari, Kamran; Alamdari, Shahram; Meibodi, Mohammad Kalantar; Shojaee, Majid; Foroozanfar, Mohammad Mehdi; Hashemi, Behrooz; Sabzeghaba, Anita; Kabir, Ali

    2012-02-01

    To assess the deficiencies and potential areas through a medical audit of the emergency departments, in six general hospitals affiliated to Shahid Beheshti University of Medical Sciences at Tehran, Iran, after preparing specific wards-based international standards. A checklist was completed for all hospitals which met our eligibility criteria mainly observation and interviews with head nurses and managers of the emergency medicine unit of the hospitals before (2003) and after (2008) the establishment of emergency departments there. Domains studied included staffing, education and continuing professional development (CPD), facility (design), equipment, ancillary services, medical records, manuals and references, research, administration, pre-hospital care, information systems, disaster planning, bench-marking and hospital accreditation. Education and CPD (p = 0.042), design and facility (p = 0.027), equipment (p = 0.028), and disaster (p = 0.026) had significantly improved after the establishment of emergency departments. Nearly all domains showed a positive change though it was non-significant in a few. In terms of observation, better improvement was seen in disaster, security, design, and research. According to the score for each domain compared to what it was in the earlier phase, better improvement was observed in hospital accreditation, information systems, security, disaster planning, and research. Security, disaster planning, research, design and facility had improved in hospitals that wave studied, while equipment, records, ancillary services, administration and bench-marking had the lowest improvement even after the establishment of emergency department, and, hence, needed specific attention.

  11. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  12. Business Planning for a Campus-Wide Biobank.

    Science.gov (United States)

    Tarling, Tamsin E; Lasser, Frances; Carter, Candace; Matzke, Lise A M; Dhugga, Gurm; Arora, Nidhi; Dee, Simon; LeBlanc, Jodi; Babinsky, Sindy; O'Donoghue, Sheila; Cheah, Stefanie; Watson, Peter; Vercauteren, Suzanne M

    2017-02-01

    Biobanks are resources that facilitate research. Many biobanks exist around the world, but most tend to focus on a specific disease or research area. BC Children's Hospital and BC Women's Hospital are located on the same campus (Oak Street Campus) in Vancouver, BC, Canada. A campus-wide biobank has been established on the site of these two hospitals to collect specimens and annotated data from children or women seeking medical care at either of the hospitals. Such an initiative requires careful planning and consideration of many factors such as buy in and support of key stakeholders, governance, financial planning, and optimizing specimen collection. We developed a business plan to account for the many aspects associated with integrating the "BC Children's Hospital BioBank." This document describes the approach our business plan took for the implementation of our biobank and the progress, including deviations from the business plan. We also provide a perspective on the current status with a focus on sustainability.

  13. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  14. A study to analyze IAEA planning of 2004-2005 programme and to establish cooperation directions with the IAEA

    International Nuclear Information System (INIS)

    Oh, K. B.; Lee, K. S.; Lee, B. W.; Ko, H. S.; Ryu, J. S.; Lee, T. J.; Kim, M. R.

    2003-07-01

    The objective of this study is to utilize the IAEA effectively through reflecting Korea's opinion fully for the planning of the Agency's 2004∼2005 Programme. This study first analyzed the current status of the IAEA Programme and Budget and reviewed the issues relevant to Korea. Second, this study assessed the IAEA 2004∼2005 Programme and drew up Korea's opinion for it. The official document including the opinions was submitted to the Secretariat. In reviewing the Programme, this study considered the strengths of Korea related to the Programme. Also some projects and CRPs, which can be lead by Korea, were proposed. The IAEA 2004∼2005 Programme reflected well the technical and social changes and its structure seems to be proper. The budget was proposed to be increased over 10%, violating the zero-real growth principle. This seems to be inevitable considering the increase of safeguards activities. However, there should be prepared some measures to avoid rapid increase of the burdens of the Member States. In the process of the planning of the IAEA 2004∼2005 Programme, the following points should be emphasized. First, SMR activities should be given a high priority considering the high interests of developing countries and be set up as a separate project as in the 2002∼2003 Programme. Second, more budget should be allocated for Project A.4.04(Support for demonstration of nuclear seawater desalination), considering the highest priority of the project in Program A. Third, it's better to change the title of Subprogram C.3 to 'Nuclear knowledge Preservation' to stick to the original rationale of the subprogram. There is a need for further activities such as establishing and implementing the concept of international nuclear school based on the result of the feasibility study done in 2002∼2003. Fourth, further activities needs to be added to the Project D.2.03 for the efficient conversion to high density, low enriched uranium in Member States; for instance, review

  15. Class solution for inversely planned permanent prostate implants to mimic an experienced dosimetrist

    International Nuclear Information System (INIS)

    Lessard, Etienne; Kwa, Stefan L. S.; Pickett, Barby; Roach, Mach III; Pouliot, Jean

    2006-01-01

    The purpose of this paper is to present a method for the selection of inverse planning parameters and to establish a set of inverse planning parameters (class solution) for the inverse planning included in a commercial permanent prostate implant treatment planning system. The manual planning of more than 750 patients since 1996 led to the establishment of general treatment planning rules. A class solution is tuned to fulfill the treatment planning rules and generate equivalent implants. For ten patients, the inverse planning is compared with manual planning performed by our experienced physicist. The prostate volumes ranged from 17 to 51 cc and are implanted with low activity I-125 seeds. Dosimetric indices are calculated for comparison. The inverse planning needed about 15 s for each optimization (400 000 iterations on a 2.5 GHz PC). In comparison, the physicist needed about 20 min to perform each manual plan. A class solution is found that consistently produces dosimetric indices equivalent or better than the manual planning. Moreover, even with strict seed placement rules, the inverse planning can produce adequate prostate dose coverage and organ at risk protection. The inverse planning avoids implant with seeds outside of the prostate and too close to the urethra. It also avoids needles with only one seed and needles with three consecutive seeds. This reduces the risk of complication due to seed misplacement and edema. The inverse planning also uses a smaller number of needles, reducing the cause of trauma. The quality of the treatment plans is independent of the gland size and shape. A class solution is established that consistently and rapidly produces equivalent dosimetric indices as manual planning while respecting severe seed placement rules. The class solution can be used as a starting point for every patient, dramatically reducing the time needed to plan individual patient treatments. The class solution works with inverse preplanning, intraoperative

  16. MINERVA - a multi-modal radiation treatment planning system

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, C.A. E-mail: cew@enel.gov; Wessol, D.E.; Nigg, D.W.; Cogliati, J.J.; Milvich, M.L.; Frederickson, C.; Perkins, M.; Harkin, G.J

    2004-11-01

    Researchers at the Idaho National Engineering and Environmental Laboratory and Montana State University have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system. This system can be used for planning and analyzing several radiotherapy modalities, either singly or combined, using common modality independent image and geometry construction and dose reporting and guiding. It employs an integrated, lightweight plugin architecture to accommodate multi-modal treatment planning using standard interface components. The MINERVA design also facilitates the future integration of improved planning technologies. The code is being developed with the Java Virtual Machine for interoperability. A full computation path has been established for molecular targeted radiotherapy treatment planning, with the associated transport plugin developed by researchers at the Lawrence Livermore National Laboratory. Development of the neutron transport plugin module is proceeding rapidly, with completion expected later this year. Future development efforts will include development of deformable registration methods, improved segmentation methods for patient model definition, and three-dimensional visualization of the patient images, geometry, and dose data. Transport and source plugins will be created for additional treatment modalities, including brachytherapy, external beam proton radiotherapy, and the EGSnrc/BEAMnrc codes for external beam photon and electron radiotherapy.

  17. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Science.gov (United States)

    2010-01-01

    ... simple options) to establish adequate long-term state control; an estimate of the fair market value of... simple property interest (e.g., conservation easement), fee simple property acquisition, or a combination..., including appropriate government enforcement agencies; (9) If applicable, a restoration plan describing...

  18. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  19. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    International Nuclear Information System (INIS)

    Evans, S. K.

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems

  20. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S. K.

    2007-11-07

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

  1. Regional cooperation for emergency plan

    International Nuclear Information System (INIS)

    Chu, D.S.L.; Liu, P.C.

    1981-01-01

    It has become increasingly evident since the Three Mile Island (TMI) accident that a sound emergency plan is indispensable to the overall nuclear power generation program. In some developing countries in Eastern Aisa, the availability of manpower resources and facilities to handle a nuclear power plant accident are rather limited. Therefore, the establishment of a regional mutual emergency plan is deemed necessary. A preliminary idea concerning this establishment is presented for deliberation by this Conference

  2. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  3. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  4. Establishing Medical Schools in Limited Resource Settings.

    Science.gov (United States)

    Tsinuel, Girma; Tsedeke, Asaminew; Matthias, Siebeck; Fischer, Martin R; Jacobs, Fabian; Sebsibe, Desalegn; Yoseph, Mamo; Abraham, Haileamlak

    2016-05-01

    One urgent goal of countries in sub-Saharan Africa is to dynamically scale up the education and work force of medical doctors in the training institutions and health facilities, respectively. These countries face challenges related to the rapid scale up which is mostly done without proper strategic planning, without the basic elements of infrastructure development, educational as well as academic and administrative human resources. Medical education done in the context of limited resources is thus compromising the quality of graduates. In the future, a collaborative and need-based approach involving major stakeholders such as medical educators concerned, ministries, planners and policy makers is needed. This article identifies the challenges of establishing medical schools and sustaining the quality of education through rapid scale-up in Sub-Saharan Africa in the settings of limited resources. It also outlines the minimum requirements for establishing medical schools. A consensus building workshop was conducted in Bishoftu, Ethiopia, from Nov 8-12, 2013. Participants were professionals from 13 Ethiopian medical schools, and representatives of medical schools from South Sudan, Somaliland, Somalia, and Mozambique. Participants are listed in Appendix 1. The governments and stakeholders should jointly develop strategic plans and a roadmaps for opening or expanding medical schools to scale up educational resources. It is advisable that medical schools have autonomy regarding the number of student-intake, student selection, curriculum ownership, resource allocation including for infrastructure and staff development. Health science and medical curricula should be integrated within and harmonized nationally. An educational evaluation framework needs to be embedded in the curricula, and all medical schools should have Health Science Education Development Centers.

  5. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  6. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  7. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  8. International guidelines for fire protection at nuclear installations including nuclear fuel plants, nuclear fuel stores, teaching reactors, research establishments

    International Nuclear Information System (INIS)

    The guidelines are recommended to designers, constructors, operators and insurers of nuclear fuel plants and other facilities using significant quantities of radioactive materials including research and teaching reactor installations where the reactors generally operate at less than approximately 10 MW(th). Recommendations for elementary precautions against fire risk at nuclear installations are followed by appendices on more specific topics. These cover: fire protection management and organization; precautions against loss during construction alterations and maintenance; basic fire protection for nuclear fuel plants; storage and nuclear fuel; and basic fire protection for research and training establishments. There are numerous illustrations of facilities referred to in the text. (U.K.)

  9. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  10. PLANNING NATIONAL RADIOTHERAPY SERVICES

    Directory of Open Access Journals (Sweden)

    Eduardo eRosenblatt

    2014-11-01

    Full Text Available Countries, states and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centres are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment.This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centres, equipment, staff, education pr

  11. Yucca Mountain Site Characterization Project Waste Package Plan

    International Nuclear Information System (INIS)

    Harrison-Giesler, D.J.; Jardine, L.J.

    1991-02-01

    The goal of the US Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP) waste package program is to develop, confirm the effectiveness of, and document a design for a waste package and associated engineered barrier system (EBS) for spent nuclear fuel and solidified high-level nuclear waste (HLW) that meets the applicable regulatory requirements for a geologic repository. The Waste Package Plan describes the waste package program and establishes the technical approach against which overall progress can be measured. It provides guidance for execution and describes the essential elements of the program, including the objectives, technical plan, and management approach. The plan covers the time period up to the submission of a repository license application to the US Nuclear Regulatory Commission (NRC). 1 fig

  12. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    Science.gov (United States)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. A guide for preparing Hanford Site facility effluent monitoring plans

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1992-06-01

    This document provides guidance on the format and content of effluent monitoring plans for facilities at the Hanford Site. The guidance provided in this document is designed to ensure compliance with US Department of Energy (DOE) Orders 5400.1 (DOE 1988a), 5400.3 (DOE 1989a), 5400.4 (DOE 1989b), 5400.5 (DOE 1990a), 5480.1 (DOE 1982), 5480.11 (DOE 1988b), and 5484.1 (DOE 1981). These require environmental monitoring plans for each site, facility, or process that uses, generates, releases, or manages significant pollutants of radioactive or hazardous materials. In support of DOE Orders 5400.5 (Radiation Protection of the Public and the Environment) and 5400.1 (General Environmental Protection Program), the DOE Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE 1991) should be used to establish elements of a radiological effluent monitoring program in the Facility Effluent Monitoring Plan. Evaluation of facilities for compliance with the US Environmental Protection Agency Clean Air Act of 1977 requirements also is included in the airborne emissions section of the Facility Effluent Monitoring Plans. Sampling Analysis Plans for Liquid Effluents, as required by the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), also are included in the Facility Effluent Monitoring Plans. The Facility Effluent Monitoring Plans shall include complete documentation of gaseous and liquid effluent sampling and monitoring systems

  14. Payload Crew Training Complex (PCTC) utilization and training plan

    Science.gov (United States)

    Self, M. R.

    1980-01-01

    The physical facilities that comprise the payload crew training complex (PCTC) are described including the host simulator; experiment simulators; Spacelab aft flight deck, experiment pallet, and experiment rack mockups; the simulation director's console; payload operations control center; classrooms; and supporting soft- and hardware. The parameters of a training philosophy for payload crew training at the PCTC are established. Finally the development of the training plan is addressed including discussions of preassessment, and evaluation options.

  15. 45 CFR 1176.5 - Annual plan.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Annual plan. 1176.5 Section 1176.5 Public Welfare... ENDOWMENT FOR THE HUMANITIES PART-TIME CAREER EMPLOYMENT § 1176.5 Annual plan. (a) An agencywide plan for promoting part-time employment opportunities will be developed annually. This plan will establish annual...

  16. Plan of intakes for establish more Shimane-3 in Shimane Nuclear Power Plant

    International Nuclear Information System (INIS)

    Ohmura, Tsuyoshi; Nakamoto, Kenji; Fukumoto, Tadashi; Kanda, Kazunori

    2007-01-01

    Shimane-3 reactor (ABWR) has been constructed to aim at operating in December, 2011. Outline of intakes works are stated. The environmental loads and cost were reduced by changing intake works from the embedded steel pipe method to the undersea tunnel method. Plan of intakes, development of Pneumatic Caisson intake, and investigation of bedrock of submarine in the surrounding of intake are reported. The construction planning of Pneumatic Caisson intake consists of the foundation work, installation of intake unit, connection of intake tunnels and flow of water. The uniformity intake structure was investigated by the hydraulic model tests and the numerical analysis. Dredging of rocks in the foundation spot of intake and construction of intakes on land are under construction. A construction work plan, design for intakes, the embedded steel pipe method, the undersea tunnel method, Pneumatic Caisson intake, topographic features and intake tanks are illustrated. (S.Y.)

  17. Soft space regional planning as an approach for integrated transport and land use planning in Sweden – challenges and ways forward

    Directory of Open Access Journals (Sweden)

    Fredrik Pettersson

    2016-01-01

    Full Text Available Current mobility patterns mean that many trips cross one or several municipal borders. This emphasises the need to integrate land-use and transport planning at regional functional scales. However, the Swedish planning system is characterised by a ‘municipal planning monopoly’, where local governments control the formal planning instruments. The lack of formal means for regional-level planning has sparked initiatives that can be characterised as soft spaces in planning. The paper analyses how soft space planning as spatial strategy making at regional level is influencing local-level planning. The analysis covers 10 municipalities in the Swedish Region of Skåne. The results illustrate that the dialogue-based process has established a broad consensus on the need to consider the regional scale in municipal planning. However, the results also show that the impact on planning is limited since the consensus-based process resulted in strategic objectives with limited influence on prevailing planning practices. Findings also illustrate that key concepts for operationalising the strategies – including densification and public transport accessibility – were defined and used differently in different municipalities. Consequently, a more stringent use, and stricter definitions, of core concepts could be a way to strengthen the capacity of soft space regional planning.

  18. The Role of Vocational Educators in Planning Vocational Assessment Activities for Handicapped Students: An Indepth Review of a Six Step Model.

    Science.gov (United States)

    Stodden, Robert A.; Boone, Rosalie

    1986-01-01

    Discusses the role of teachers in providing vocational assessment to disabled students. Steps in this process include (1) establish planning team and conduct information search, (2) define purpose, (3) establish basic considerations, (4) formulate assessment model, (5) establish implementation focus, and (6) pilot test and evaluate assessment…

  19. ALWR utility requirements - A technical basis for updated emergency planning

    International Nuclear Information System (INIS)

    Leaver, David E.W.; DeVine, John C. Jr.; Santucci, Joseph

    2004-01-01

    U.S. utilities, with substantial support from international utilities, are developing a comprehensive set of design requirements in the form of a Utility Requirements Document (URD) as part of an industry wide effort to establish a technical foundation for the next generation of light water reactors. A key aspect of the URD is a set of severe accident-related design requirements which have been developed to provide a technical basis for updated emergency planning for the ALWR. The technical basis includes design criteria for containment performance and offsite dose during severe accident conditions. An ALWR emergency planning concept is being developed which reflects this severe accident capability. The main conclusion from this work is that the likelihood and consequences of a severe accident for an ALWR are fundamentally different from that assumed in the technical basis for existing emergency planning requirements, at least in the U.S. The current technical understanding of severe accident risk is greatly improved compared to that available when the existing U.S. emergency planning requirements were established nearly 15 years ago, and the emerging ALWR designs have superior core damage prevention and severe accident mitigation capability. Thus, it is reasonable and prudent to reflect this design capability in the emergency planning requirements for the ALWR. (author)

  20. Draft Transportation Institutional Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  1. Risk-Based Inspection and Maintenance Planning Optimization of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    A risk-based inspection planning (RBI) approach applied to offshore wind turbines (OWT) is presented, based on RBI methodology developed in the last decades in the oil and gas industry. In wind farm (IWF) and single-alone locations are considered using a code-established turbulence models including...

  2. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  3. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  4. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  5. The feminist position on family planning in Spain.

    Science.gov (United States)

    Navarro, M V

    1984-04-01

    The Spanish feminist movement had its origins in the early 1970; in 1975 the first offical feminist conference made the following demands on the public authorities; 1) to abolish all sections of the Criminal Code which restrict women's freedom to control of their own bodies through making illegal information on and the purchase of contraceptives, 2) to decriminalize abortion, 3) to create family planning centers and to legalize contraceptives and provide them through the social security system, and 4) to include sex information in study courses. The distribution and sale of contraceptives was not legalized until 1978 and induced abortion is still a criminal offense. Nevertheless, after the 1975 meetins, a Coordinating Organization was established for the family planning committees that were functioning in the different feminist organizations. The problem of where to obtain contraceptives was solved by a group of feminist women which opened the 1st family planning center in Spain in 19779 This center was managed directly by members of the group. This and similar efforts culminated in the origin of the Movement for Movement for Family Planning that demanded in 1978; 1) the provision of sex information confronting the dominant sexual ideology and which is made a ccompulsory subject from school age, for both sexes; 2) free access to contraception for everyone; 3) the legalization of abortion, 4) the development of extensive information campaign on the problems of conception and contraception; and 5) the creation of independent, self-managed, family planning centers. There is now a Coordinating Organization of Family Planning Centers that was established in 1982. The socialist government is determined to create a public network of family planning centers.

  6. 9 CFR 108.2 - Plot plans, blueprints, and legends required.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Plot plans, blueprints, and legends... REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.2 Plot plans, blueprints, and legends required. Each applicant for an establishment license shall prepare a plot plan showing all buildings for each particular land...

  7. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  8. Local government involvement in long term resource planning for community energy systems. Demand side management

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  9. A landscape plan based on historical fire regimes for a managed forest ecosystem: the Augusta Creek study.

    Science.gov (United States)

    John H. Cissel; Frederick J. Swanson; Gordon E. Grant; Deanna H. Olson; Gregory V. Stanley; Steven L. Garman; Linda R. Ashkenas; Matthew G. Hunter; Jane A. Kertis; James H. Mayo; Michelle D. McSwain; Sam G. Swetland; Keith A. Swindle; David O. Wallin

    1998-01-01

    The Augusta Creek project was initiated to establish and integrate landscape and watershed objectives into a landscape plan to guide management activities within a 7600-hectare (19,000-acre) planning area in western Oregon. Primary objectives included the maintenance of native species, ecosystem processes and structures, and long-term ecosystem productivity in a...

  10. Information System for Land-Use Planning and Management

    Institute of Scientific and Technical Information of China (English)

    YU Xiao; MIAO Fang

    2008-01-01

    In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM+ and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.

  11. 5 CFR 330.602 - Agency plans.

    Science.gov (United States)

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS RECRUITMENT, SELECTION, AND... Employees § 330.602 Agency plans. (a) Each agency will establish a Career Transition Assistance Plan (CTAP) to actively assist its surplus and displaced employees. A copy of the final plan and any additional...

  12. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  13. Establishing a PR Plan for Each School: Guidelines to Plan for Public Relations and Marketing for Individual Schools.

    Science.gov (United States)

    Journal of Educational Public Relations, 1989

    1989-01-01

    Presented are two plans for elementary and secondary school public relations and marketing. Emphasized are staff, parent, principal and student communication skills as well as activities designed to assess community and parent concerns. (SI)

  14. Discussion on teaching reform of environmental planning and management

    Science.gov (United States)

    Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan

    2018-05-01

    The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.

  15. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  16. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  17. Planning and preparing for emergency response to transport accidents involving radioactive material. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of this Safety Guide is to provide guidance to the public authorities and others (including consignors, carriers and emergency response authorities) who are responsible for developing and establishing emergency arrangements for dealing effectively and safely with transport accidents involving radioactive material. It may assist those concerned with establishing the capability to respond to such transport emergencies. It provides guidance for those Member States whose involvement with radioactive material is just beginning. It also provides guidance for those Member States that have already developed their radioactive material industries and the attendant emergency plans but that may need to review and improve these plans

  18. Establishing Medical Schools in Limited Resource Settings | Girma ...

    African Journals Online (AJOL)

    Establishing Medical Schools in Limited Resource Settings. ... These countries face challenges related to the rapid scale up which is mostly done without proper strategic planning, without the basic elements of infrastructure development, educational as well as academic and administrative human resources. Medical ...

  19. SAVY-4000 Field Surveillance Plan Update for 2017

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Elizabeth J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stone, Timothy Amos [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Smith, Paul Herrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Reeves, Kirk Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Veirs, Douglas Kirk [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Prochnow, David Adrian [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-20

    The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-­1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.”This 2017 update reflects changes to the surveillance plan resulting from surveillance findings as documented in Reeves et al. 2016. These findings include observations of corrosion in SAVY and Hagan containers and the indication (in one SAVY container) of possible filter membrane thermal degradation. This surveillance plan update documents the rationale for selecting surveillance containers, specifies the containers for 2017 surveillance, and identifies a minimum set of containers for 2018 surveillance. This update contains important changes to the previous surveillance plans.

  20. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  1. Housing, health and master planning: rules of engagement.

    Science.gov (United States)

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  2. Business Plans For Dummies

    CERN Document Server

    Tiffany, Paul; Barrow, Colin

    2011-01-01

    A full updated and extended second edition of an established UK bestseller Business Plans For Dummies 2nd Edition features new and updated information on formulating a solid business plan to build a secure business - even in an economic downturn. Complete with a brand new business plan template to get you started this expert guide offers fresh advice on reading the competitive marketplace and assessing your business in the current economic climate. It walks you step-by-step through every aspect of planning achievable business goals and diversification strategies, identifying trends, exploring

  3. A study to analyze IAEA planning of 2004-2005 programme and to establish cooperation directions with the IAEA

    Energy Technology Data Exchange (ETDEWEB)

    Oh, K. B.; Lee, K. S.; Lee, B. W.; Ko, H. S.; Ryu, J. S.; Lee, T. J.; Kim, M. R

    2003-07-01

    The objective of this study is to utilize the IAEA effectively through reflecting Korea's opinion fully for the planning of the Agency's 2004{approx}2005 Programme. This study first analyzed the current status of the IAEA Programme and Budget and reviewed the issues relevant to Korea. Second, this study assessed the IAEA 2004{approx}2005 Programme and drew up Korea's opinion for it. The official document including the opinions was submitted to the Secretariat. In reviewing the Programme, this study considered the strengths of Korea related to the Programme. Also some projects and CRPs, which can be lead by Korea, were proposed. The IAEA 2004{approx}2005 Programme reflected well the technical and social changes and its structure seems to be proper. The budget was proposed to be increased over 10%, violating the zero-real growth principle. This seems to be inevitable considering the increase of safeguards activities. However, there should be prepared some measures to avoid rapid increase of the burdens of the Member States. In the process of the planning of the IAEA 2004{approx}2005 Programme, the following points should be emphasized. First, SMR activities should be given a high priority considering the high interests of developing countries and be set up as a separate project as in the 2002{approx}2003 Programme. Second, more budget should be allocated for Project A.4.04(Support for demonstration of nuclear seawater desalination), considering the highest priority of the project in Program A. Third, it's better to change the title of Subprogram C.3 to 'Nuclear knowledge Preservation' to stick to the original rationale of the subprogram. There is a need for further activities such as establishing and implementing the concept of international nuclear school based on the result of the feasibility study done in 2002{approx}2003. Fourth, further activities needs to be added to the Project D.2.03 for the efficient conversion to high density

  4. A Study on the Planning of Technology Development and Research for Generation IV Nuclear Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Moon Hee; Kim, H. R.; Kim, H. J. and others

    2005-08-15

    This study aimed at the planning the domestic technology development of the Gen IV and the formulating the international collaborative project contents and executive plan for 'A Validity Assessment and Policies of the R and D of Generation IV Nuclear Energy Systems'. The results of the study include follows; - Survey of the technology state in the fields of the Gen IV system specific technologies and the common technologies, and the plans of the international collaborative research - Drawing up the executive research and development plan by the experts of the relevant technology field for the systems which Korean will participate in. - Formulating the effective conduction plan of the program reflecting the view of the experts from the industry, the university and the research institute. - Establishing the plan for estimation of the research fund and the manpower for the efficient utilization of the domestic available resources. This study can be useful material for evaluating the appropriateness of the Korea's participation in the international collaborative development of the Gen IV, and can be valuably utilized to establish the strategy for the effective conduction of the program. The executive plan of the research and development which was produced in this study will be used to the basic materials for the establishing the guiding direction and the strategic conduction of the program when the research and development is launched in the future.

  5. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  6. Business plan of a food truck in Saint Petersburg

    OpenAIRE

    Zavyalova, Ekaterina

    2017-01-01

    The purpose of the thesis was to investigate how to write a proper business plan and then implement gained knowledge in creating a business plan of a food truck in Saint Petersburg. A business plan serves as a guide for an entrepreneur in the process of company establishment and enables to gain funding from potential investors. The primary objective was to study essential components of a business plan. The theoretical framework comprises of core issues on company establishment and desc...

  7. 40 CFR 130.5 - Continuing planning process.

    Science.gov (United States)

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall establish and maintain a continuing planning process (CPP) as described under section 303(e)(3)(A)-(H) of... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Continuing planning process. 130.5...

  8. Establishing pharmacy operations in a new hospital while transferring existing operations to new ownership.

    Science.gov (United States)

    Crumb, Deborah J

    2010-04-01

    The process of moving pharmacy services and personnel from an existing hospital to a new hospital while maintaining patient care and operations at both facilities is described. The project management structure for the new hospital is described, including the establishment of a departmental coordination team (DCT) for the pharmacy. The purpose of the pharmacy DCT was to plan and coordinate new hospital move-in and pharmacy operations as well as the transition of the existing hospital to new ownership. The use of action item lists and project scorecards kept the project on schedule and on budget. The pharmacy DCT's action item list, which sorted items into four categories (facilities, equipment, operations, and staffing), was reviewed and updated at the weekly meeting of pharmacy leadership and served as the principal guiding document for the pharmacy DCT. Planning and implementation are described for the areas of operations and workflow, staffing, information technology, materials management, accreditation and licensure, and orientation and training. On the transition day, patients under care by physicians employed by the governing organization were transferred to the new facility while patients under care by community physicians remained at the existing facility under new ownership and new administration. Integral to the successful transition were early planning, the provision of adequate training for all employees, and collaboration among organizations, departments, and individuals. A well-coordinated plan resulted in the successful establishment of pharmacy practice in a new hospital and the transition of an operational pharmacy practice and facility to new ownership while maintaining quality patient care.

  9. Upland and wetland vegetation establishment on coal slurry in northern Missouri

    International Nuclear Information System (INIS)

    Skeel, V.A.; Nawrot, J.R.

    1998-01-01

    Since the Cooperative Wildlife Research Laboratory's (CWRL) Mined Land Reclamation Program's first establishment of a wetland on slurry in 1976, industry, state, and federal agency interest in reclamation alternatives for inactive slurry has increased. CWRL has been involved in pre-reclamation site characterization and monitoring for inactive slurry impoundments throughout Illinois, Indiana, Kansas, Kentucky, Missouri, and Washington. Geochemical site characterization of three slurry impoundments at the AECI Bee Veer Mine located near Macon, Missouri began in April 1990. A substrate sampling grid was established for all slurry impoundments with a centerline orientated parallel to the discharge to decant flow pattern. Surface (0--6 in.) and subsurface (30--36 in.) slurry samples were collected annually and analyzed for acid-base balance, immediate acidity macro- and micro-nutrients, potential phytotoxic metallic ions and salts, and texture. Water table elevations and water quality were monitored quarterly from shallow (≤12 ft.) piezometers. General reclamation plans included annual (3 years) incremental limestone amendments (35--50 tons/acre) and direct vegetation establishment. Cool and warm season grasses dominate vegetation cover in upland habitats (slurry cell RDA1) while wetland habitats (palustrine emergent seasonally-permanently inundated) have been established in slurry cells (RDA2 and RDA3). Isolated hot spots continue to be amended with limestone and supplemental vegetation establishment is scheduled

  10. Improved operational performance through the use of business planning tools

    International Nuclear Information System (INIS)

    Hoelscher, H.L.

    1996-01-01

    Improved operational performance at Point Beach Nuclear Plant is based on a focused business plan. Quantitative goals that compare past performance with the performance of potential competitors are the basis of the business plan. This establishes goals for the nuclear power business unit which support corporate goals. Strategies and objectives are then developed to meet the established goals. To continue support for these strategies and objectives, individual performance plans are developed for all management personnel. These performance management plans identify individual contributor actions to support the goals, and also provide periodic feedback for changes to better prioritize individual actions. Performance criteria are also established to measure progress toward achieving the goals. The author also has a program to provide incentives for improved performance based upon success of the organization in achieving established goals

  11. OMEGA (Offshore Membrane for Enclosing Algae). NASA-NAVY: A Strategic Planning Discussion

    Science.gov (United States)

    Trent, Jonathan

    2010-01-01

    This briefing packet provides a short introduction to OMEGA and a truncated version of our project approach, with an example of the kind of work break down structure (WBS) used to guide our Phase I activities. It is meant to give you an impression of how we are approaching the challenge of creating the world's first marine photobioreactor (PBR) that will scale to address the strategic energy problems confronting the United States and the world. Some of our conceptual PBR designs and plans for logistics are included to communicate the path we have taken. We have also included an aerial photograph of the experimental tanks we are using at the Cal Fish and Game, followed by concluding remarks. The overarching purpose of the strategic planning discussion in Norfolk is to establish the relationship between the NASA OMEGA Team and the Navy, to unite the strengths of both agencies, and to map a mutual way forward along the project's established critical path.

  12. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  13. Hurricane Sandy science plan: impacts of storm surge, including disturbed estuarine and bay hydrology

    Science.gov (United States)

    Caskie, Sarah A.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: • Coastal topography and bathymetry • Impacts to coastal beaches and barriers

  14. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  15. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  16. Governance in regional development planning?

    DEFF Research Database (Denmark)

    Galland, Daniel

    2008-01-01

    The purpose of this paper is to lay part of the groundwork for a new project aimed at exploring governance aspects concerned with regional development planning (RDP) in Denmark. The fundamental objective is to help establish and clarify a number of research questions to delve into the conditions...... and opportunities for anchoring and implementing such RDP. The paper mainly adopts a descriptive approach to portray tentative pathways to explore and discuss regional governance structures, procedures and practices that are being developed in establishing new RDP processes, strategies and plans....

  17. METHODOLOGICAL PROBLEMS OF LAND USE PLANNING LOCALLY IN TERMS OF NEW LAND RELATIONS AND DECENTRALIZATION OF POWER

    Directory of Open Access Journals (Sweden)

    N. Kapinos

    2017-05-01

    Full Text Available Summary Fundamental changes of land relations that have been established for the period of land reform in the independent Ukraine and the new socio-economic and environmental problems identified new character and content of the land. During the land reform in Ukraine to land management encountered new challenges that focus on the implementation of land policy and land relations fundamental change. Accordingly, to land management faces new challenges. Today for events to decentralize power facilities, new land - the territory united local communities should determine for whom the prospect of organizing the use and protection of land and other natural resources. However, the current land law the answer to this problem does not. Instead, normalization is an attempt to issues related to improving the quality of drafting documentation spatial planning (urban planning documents establish procedures for integrated development plans of local communities, the introduction of rules regulating local area to establish procedures for planning, construction and other use areas and about objects, improving public hearings to address public interests and relieve tension in the planning and construction of the territories. However, planning documentation does not solve the problems of perspective development of the organization use and protection of land and other natural resources. There is a need to distinguish between objects of regional urban planning and land management. This is because the urban planning regulations covering mainly two categories of land (settlements, industry, transport, communications and other purposes, not including agricultural land, which houses objects of capital construction. However, they make up for Ukraine just 4.2% of the total area. For the remaining seven categories of land (agricultural land, forest and water resources, conservation, recreation, recreational purposes land use planning and their protection should be based on

  18. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  19. A plan of radiation work market on the web

    International Nuclear Information System (INIS)

    Nakagawa, Haruo; Chino, Koichi

    2002-01-01

    In Japan there are many kinds of radiation facilities, and a great number of radiation employees are engaged in plant repairing. It is therefore, very important to strive for employee controls, radiation controls, health examinations and data control. Furthermore, it is necessary to establish a total data management system that processes numerous amounts of data concerning radiation employees. The present paper proposes the establishment of a radiation work market on the web using a total data management system. The system will include radiation employee control information service for members who are planning new employment contracts. (author)

  20. Planning a change project in mental health nursing.

    Science.gov (United States)

    Thorpe, Rebecca

    2015-09-02

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  1. Planned Change in Future Models of Project Follow Through: A Concept Paper.

    Science.gov (United States)

    Simpkins, Edward; Brown, Asa

    The three chapters included in this paper establish a basis for organizing future implementations of Project Follow Through. Specifically, chapter 1 identifies four planning objectives for coordinating such programs. Emphasis is given to the need to focus on one fundamental, pervasive variable possibly accounting for program success: time…

  2. Public affairs plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  3. Public affairs plan

    International Nuclear Information System (INIS)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies

  4. Towards a European Energy Technology Policy - The European Strategic Energy Technology Plan (Set-Plan)

    International Nuclear Information System (INIS)

    Mercier, A.; Petric, H.; Peteves, E.

    2008-01-01

    The transition to a low carbon economy will take decades and affect the entire economy. There is a timely opportunity for investment in energy infrastructure. However, decisions to invest in technologies that are fully aligned with policy and society priorities do not necessarily come naturally, although it will profoundly affect the level of sustainability of the European energy system for decades to come. Technology development needs to be accelerated and prioritized at the highest level of the European policy agenda. This is the essence of the European Strategic Energy Technology Plan (SET-Plan). The SET-Plan makes concrete proposals for action to establish an energy technology policy for Europe, with a new mind-set for planning and working together and to foster science for transforming energy technologies to achieve EU energy and climate change goals for 2020, and to contribute to the worldwide transition to a low carbon economy by 2050. This paper gives an overview of the SET-Plan initiative and highlights its latest developments. It emphasises the importance of information in support of decision-making for investing in the development of low carbon technologies and shows the first results of the technology mapping undertaken by the newly established Information System of the SET-Plan (SETIS).(author)

  5. Nuclear power planning and feasibility studies

    International Nuclear Information System (INIS)

    Streeton, D.F.

    1977-01-01

    This lecture will review the basic steps associated with planning the introduction of nuclear power. Areas covered will include power market surveys, energy resources evaluations, potential alternative strategies, organisational factors and implementational requirements. The lecture will then consider the implications and requirements associated with establishing the feasibility of a nuclear project. Among others, aspects of power systems integration, site selection reactor type evaluation, cost and economic analysis, influence of contracting strategies, comparison with alternative power generation solutions, financial impact, etc. will be discussed and reviewed. (HK) [de

  6. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  7. Stakeholder perceptions of a total market approach to family planning in Nicaragua.

    Science.gov (United States)

    Drake, Jennifer Kidwell; Espinoza, Henry; Suraratdecha, Chutima; Lacayo, Yann; Keith, Bonnie M; Vail, Janet G

    2011-05-01

    To assess private-sector stakeholders' and donors' perceptions of a total market approach (TMA) to family planning in Nicaragua in the context of decreased funding; to build evidence for potential strategies and mechanisms for TMA implementation (including public-private partnerships (PPPs)); and to identify information gaps and future priorities for related research and advocacy. A descriptive exploratory study was conducted in various locations in Nicaragua from March to April 2010. A total of 24 key private-sector stakeholders and donors were interviewed and their responses analyzed using two questionnaires and a stakeholder analysis tool (PolicyMakerTM software). All survey participants supported a TMA, and public-private collaboration, in family planning in Nicaragua. Based on the survey responses, opportunities for further developing PPPs for family planning include building on and expanding existing governmental frameworks, such as Nicaragua's current coordination mechanism for contraceptive security. Obstacles include the lack of ongoing government engagement with the commercial (for-profit) sector and confusion about regulations for its involvement in family planning. Strategies for strengthening existing PPPs include establishing a coordination mechanism specifically for the commercial sector and collecting and disseminating evidence supporting public-private collaboration in family planning. There was no formal or absolute opposition to a TMA or PPPs in family planning in Nicaragua among a group of diverse nongovernmental stakeholders and donors. This type of study can help identify strategies to mobilize existing and potential advocates in achieving articulated policy goals, including diversification of funding sources for family planning to achieve contraceptive security.

  8. 14 CFR 136.39 - Air tour management plans (ATMP).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall... of decision. (d) Procedure. In establishing an ATMP for a national park or tribal lands, the...

  9. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  10. Home energy rating system business plan feasibility study in Washington state

    Energy Technology Data Exchange (ETDEWEB)

    Lineham, T.

    1995-03-01

    In the Fall of 1993, the Washington State Energy Office funded the Washington Home Energy Rating System project to investigate the benefits of a Washington state HERS. WSEO established a HERS and EEM Advisory Group. Composed of mortgage lenders/brokers, realtors, builders, utility staff, remodelers, and other state agency representatives, the Advisory Group met for the first time on November 17, 1993. The Advisory Group established several subcommittees to identify issues and options. During its March 1994 meeting, the Advisory Group formed a consensus directing WSEO to develop a HERS business plan for consideration. The Advisory Group also established a business plan subcommittee to help draft the plan. Under the guidance of the business plan subcommittee, WSEO conducted research on how customers value energy efficiency in the housing market. This plan represents WSEO`s effort to comply with the Advisory Group`s request. Why is a HERS Business Plan necessary? Strictly speaking this plan is more of a feasibility plan than a business plan since it is designed to help determine the feasibility of a new business venture: a statewide home energy rating system. To make this determination decision makers or possible investors require strategic information about the proposed enterprise. Ideally, the plan should anticipate the significant questions parties may want to know. Among other things, this document should establish decision points for action.

  11. 75 FR 45584 - Planning and Establishment of State-Level Exchanges; Request for Comments Regarding Exchange...

    Science.gov (United States)

    2010-08-03

    ... governing board composition, etc.)? b. To what extent have States begun developing business plans or budgets... and what is the timing for such tasks? What kinds of business functions will need to be operational... operational functions (e.g., eligibility determination, plan qualification, data reporting, payment flows, etc...

  12. Underground Test Area Activity Communication/Interface Plan, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States); Rehfeldt, Kenneth [Navarro, Las Vegas, NV (United States)

    2016-10-01

    The purpose of this plan is to provide guidelines for effective communication and interfacing between Underground Test Area (UGTA) Activity participants, including the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and its contractors. This plan specifically establishes the following: • UGTA mission, vision, and core values • Roles and responsibilities for key personnel • Communication with stakeholders • Guidance in key interface areas • Communication matrix

  13. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  14. Exploring the Theory of Planned Behavior to Explain Sugar-Sweetened Beverage Consumption

    Science.gov (United States)

    Zoellner, Jamie; Estabrooks, Paul A.; Davy, Brenda M.; Chen, Yi-Chun; You, Wen

    2012-01-01

    Objective: To describe sugar-sweetened beverage (SSB) consumption and to establish psychometric properties and utility of a Theory of Planned Behavior (TPB) instrument for SSB consumption. Methods: This cross-sectional survey included 119 southwest Virginia participants. Most of the respondents were female (66%), white (89%), and had at least a…

  15. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  16. Establishment of comprehensive promotion plan for utilization, research and development of radiation and radioisotopes

    International Nuclear Information System (INIS)

    Choi, Young Myung; Kim, H. J.; Ham, C. H.; Yang, M. H.; Chung, W. S.; Park, K. B.; Jin, J. H.; Song, H. S.; Nho, Y. C.; Byun, M. W.; Kim, J. R.; Han, H. S.; Chung, Y. S.; Yun, P. M.; Lee, H. Y.; Seo, K. W.; Chang, S. Y.; Kee, S. R.; Lhu, S. R.; Choi, Y. S.

    1997-05-01

    This study surveys state-of-art radiation/RI industries and research organizations and their activities. The major objective of the survey is to collect useful information on the status of these industries, discuss issues concerning radiation /RI utilization. We, therefore, send questionnaires to field workers engaged in RI industries and research organizations to feedback on real field issues and problems. Considering the specificity and diversity of the radiation / RI area, six sectors are set up for its promotion. Each sector includes status analysis, active promotion measures and implementation plans. Six areas are as follows; 1) systematic developments of radiation /RI utilization technologies covers technology development for industrial applications, technology development for agricultural applications, technology development for medical applications, development of RI and radiation generators, and expansion of infra-structure for enhancement of radiation / RI utilization, and fostering radiation science. 2) activation of radiation / RI indusries 3) rationalization of radiation / RI regulation 4) international cooperation, 5) manpower development 6) finance. (author). 14 refs., 34 tabs., 5 figs

  17. Improving Access to Quality Care in Family Planning: WHO's Four Cornerstones of Evidence-based Guidance

    Institute of Scientific and Technical Information of China (English)

    Shang-chun WU; Yan ZOU; K Church; O Meirik

    2007-01-01

    The four cornerstones of guidance in technique service of family planning are established by WHO based on high quality evidences. They have been updated according to the appearing new evidences, and the consensuses were reached by the international experts in this field. The four documents include Medical Eligibility Criteria for Contraceptive Use, Selected Practice Recommendations for Contraceptive Use, Decision-making Tool for Family Planning Clients and Providers and The Global Handbook for Family Planning Providers. The first two documents mainlyface to the policy-makers and programme managers and were treated as the important references for creating the local guideline. The other two documents were developed for the front-line health-care and family planning providers at different levels, which include plenty of essential technical information to help providers improve their ability in service delivery and counselling. China paid great attention to the introduction and application of WHO guidelines. As soon as the newer editions of these documents were available, the Chinese version would be followed. WHO guidelines have been primarily adapted with the newly issued national guideline, The Clinical Practical Skill Guidelines- Family Planning Part, which was established by China Medical Association. At the same time, the WHO guidelines have been introduced to some of the linicians and family planning providers at different levels. In the future, more special training courses will be introduced to the township level based on the needs of grassroot providers.

  18. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  19. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  20. Local adaptation of the National Physical Activity Plan: creation of the Active Living Plan for a Healthier San Antonio.

    Science.gov (United States)

    Esparza, Laura A; Velasquez, Katherine S; Zaharoff, Annette M

    2014-03-01

    Physical inactivity and related health consequences are serious public health threats. Effective strategies to facilitate and support active-living opportunities must be implemented at national, state, and local levels. San Antonio, Texas, health department officials launched the Active Living Council of San Antonio (ALCSA) to engage the community in developing a 3- to 5-year plan to promote active living. A steering committee set preliminary ALCSA aims and established a multisector membership structure modeled after the US National Physical Activity Plan (NPAP). ALCSA adopted governance standards, increased knowledge of physical activity and health, and engaged in an 18-month collaborative master plan writing process. ALCSA selected overarching strategies and evidence-based strategies for each societal sector and adapted strategies to the local context, including tactics, measures of success, and timelines. Community and expert engagement led to a localized plan reflecting national recommendations, the Active Living Plan for a Healthier San Antonio. Multisector collaborations among governmental agencies and community organizations, which were successfully developed in this case to produce the first-ever local adaptation of the NPAP, require clearly defined expectations. Lessons learned in ALCSA's organizational and plan development can serve as a model for future community-driven efforts to increase active living.

  1. Planning for energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  2. 78 FR 21162 - Notice of Intent to Establish an Information Collection

    Science.gov (United States)

    2013-04-09

    ... personal life balance, mentoring, training and research opportunities, and career paths and plans... understand the labor markets and work experiences of recent doctorate recipients. To establish common...

  3. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  4. Legislative framework on establishing emergency response plan in the case of a nuclear accident

    International Nuclear Information System (INIS)

    Novosel, N.; Valcic, I.; Biscan, R.

    2000-01-01

    To give an overview of the legislative framework, which defined emergency planning in Croatia in the case of a nuclear accident, it's necessary to look at all international recommendations and obligations and the national legislation, acts and regulations. It has to be emphasized that Croatia signed three international conventions in this field, and by that took over some responsibilities and obligations. Beside that, it is also in Croatian interest to follow the recommendations of international institutions such as International Atomic Energy Agency (IAEA standards and technical documents). On the other hand, national legislation in this field consists of several laws, which cover nuclear safety measures, governmental organization, natural disasters and acts (decree, decisions) of responsible authority for emergency planning in the case of a nuclear accident (Ministry of Economy). This paper presents an overview of the international and Croatian legislation which influenced the emergency planning in the case of a nuclear accident. (author)

  5. Operational radioactive defense waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1981-07-01

    The Operational Radioactive Defense Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  6. Configuration management plan for Machine Interface Test System (MITS)

    International Nuclear Information System (INIS)

    O'Neill, C.K.

    1980-01-01

    The discipline required by this plan will apply from the establishment of a configuration baseline until completion of the final test in the MITS. The plan applies to configured items of hardware and software as well as to the specifications and drawings for these items. The plan encompasses establishment of the facility baseline, interface definition, classes of change, change control, change paper, organizational responsibilities and relationships, test configuration (as opposed to facility), and configuration data retention

  7. Low-level radioactive waste research program plan

    International Nuclear Information System (INIS)

    O'Donnell, E.; Lambert, J.

    1989-11-01

    The Waste Management Branch, Division of Engineering, Office of Nuclear Regulatory Research, has developed a strategy for conducting research on issues of concern to the US Nuclear Regulatory Commission (NRC) in its efforts to ensure safe disposal of low-level radioactive waste (LLW). The resulting LLW research program plan provides an integrated framework for planning the LLW research program to ensure that the program and its products are responsive and timely for use in NRC's LLW regulatory program. The plan discusses technical and scientific issues and uncertainties associated with the disposal of LLW, presents programmatic goals and objectives for resolving them, establishes a long-term strategy for conducting the confirmatory and investigative research needed to meet these goals and objectives, and includes schedules and milestones for completing the research. Areas identified for investigation include waste form and other material concerns, failure mechanisms and radionuclide releases, engineered barrier performance, site characterization and monitoring, and performance assessment. The plan proposes projects that (1) analyze and test actual LLW and solidified LLW under laboratory and field conditions to determine leach rates and radionuclide releases, (2) examine the short- and long-term performance of concrete-enhanced LLW burial structures and high-integrity containers, and (3) attempt to predict water movement and contaminant transport through low permeability saturated media and unsaturated porous media. 4 figs., 3 tabs

  8. Investors' perspective and needs in the process of developing a business plan

    Directory of Open Access Journals (Sweden)

    Stankov Biljana

    2015-01-01

    Full Text Available A business plan is a very important written document about the current state and future intentions of the company and it meets the information and other needs of a wide range of users, regardless of the size of the company and its organizational structure, or belonging to particular economic activity; regardless of the stage of the life cycle in which the company is located and the like . A business plan is written by the existing, established companies for different needs as well as by startup companies that are eager to show the profitability of the business venture and the success of business ideas realization. The business plan often stands out as a means to establish initial communication between entrepreneurs and financing sources, as well as for their initial meeting. The research problem relates to highlighting the business plan as a very powerful means in the hands of entrepreneurs in applying for obtaining the necessary financial resources. The subject of the research includes the analysis of the differences between the many users of a business plan with an emphasis on commercial banks, investment funds and private investors, as financiers of the business venture and the most important users. The aim of the research relates to highlighting the needs of investors and appreciation of their perspectives in the process of developing a business plan, because without a quality business plan investor is at risk of unsafe moving through a very uncertain and changing environment.

  9. The Swedish National Defence Research Establishment and the plans for Swedish nuclear weapons

    International Nuclear Information System (INIS)

    Jonter, Thomas

    2001-03-01

    This study analyses the Swedish nuclear weapons research since 1945 carried out by the Swedish National Defence Research Establishment (FOA). The most important aspect of this research was dealing with protection in broad terms against nuclear weapons attacks. However, another aspect was also important from early on - to conduct research aiming at a possible production of nuclear weapons. FOA performed an extended research up to 1968, when the Swedish Government signed the Non-Proliferation Treaty (NPT), which meant the end of these production plans. Up to this date, five main investigations about the technical conditions were made, 1948, 1953, 1955, 1957 and 1965, which all together expanded the Swedish know-how to produce a bomb. The Swedish plans to procure nuclear weapons were not an issue in the debate until the mid 50's. The reason for this was simple, prior to 1954 the plans were secretly held within a small group of involved politicians, military and researchers. The change of this procedure did take place when the Swedish Supreme Commander in a public defence report in 1954 favoured a Swedish Nuclear weapons option. In 1958 FOA had reached a technical level that allowed the Parliament to make a decision. Two programs were proposed - the L-programme (the Loading Programme), to be used if the parliament would say yes to a production of nuclear weapons, and the S-programme (the Protection Programme), if the Parliament would say no. The debate on the issue had now created problems for the Social Democratic Government. The Prime Minister, Tage Erlander, who had earlier defended a procurement of nuclear weapons, was now forced to reach a compromise. The compromise was presented to the parliament in a creative manner that meant that only the S-programme would be allowed. The Government argued that the technical level did allow a 'freedom of action' up to at least the beginning of the 60's when Sweden was mature to make a decision on the issue. During this period

  10. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  11. Studies in Family Planning, Number 38. Beyond Family Planning.

    Science.gov (United States)

    Berelson, Bernard

    This paper, published by The Population Council, reviews 29 proposals dealing with population controls beyond the current efforts of national programs of voluntary family planning. The proposals are subsumed under eight descriptive categories which are: (1) Extensions of voluntary fertility control; (2) Establishment of involuntary fertility…

  12. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.

  13. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  14. Wujiang's service-oriented family planning programme.

    Science.gov (United States)

    Zhu, H

    1995-08-01

    Wujiang City in south Jiangsu Province is a county-level city, well known for its economic development and effective family planning program. Family planning is practiced voluntarily by the people. The growth rate of the city's population has decreased to 5.47/1000; the proportion of planned births has increased to 98%; and the total fertility rate has declined to 1.5. There are 34 towns (and townships) and 883 administrative villages under the jurisdiction of the city. The living standard has improved significantly. The successful implementation of family planning is largely due to the quality services delivered to farmers, especially women of reproductive age. In an interview, Mme. Ji and Mme. Shen, chiefs of the Wujiang Family Planning Committee, describe the services they deliver. The information, education, and communication (IEC) program is focused on population schools (city, town, township, and village), which deliver information to middle school students, premarital youth, and women who are pregnant, lying-in, or menopausal. Pamphlets on marriage and reproductive health are published by the county population school. Family planning service centers, which deliver contraceptive and technical services, were established in every town and township in 1993. Ultrasound scans are available and have been used to diagnose diseases, including cancer. Over 3000 women have been helped. Misuse of fetal sex identification is banned. The Family Planning Committee and the technical service centers in the city provide counselling services on fewer, healthier births; maternal and child health care; reproductive health; and treatment of infertility. There are several kinds of insurance related to family planning; these include old age support for the parents of only-children, safety insurance for only-children, and old age insurance for newlyweds. The insurance premium is shared by the couple (100 yuan) and the township (400 yuan). Only-child couples, two-daughter families

  15. Challenges and Opportunities for Establishing Design as a Research Discipline in Civil and Environmental Engineering

    DEFF Research Database (Denmark)

    Thompson, Mary Kathryn

    2013-01-01

    faculty, research and education communities, conferences, and journals. However, design remains an emerging sub-discipline in civil and environmental engineering – practiced, valued, and taught but not subject to rigorous academic research. This paper presents some of the challenges associated...... with the establishment of design as a research discipline within civil and environmental engineering, some of the benefits and opportunities that will come from that establishment, and some evidence for the fact that this process has already begun.......There are a number of fields including architecture, industrial design, and urban planning and design, where design is the discipline upon which all research and teaching activities are based. In other fields such as aerospace and mechanical engineering, design is a sub-discipline with its own...

  16. Emergency response planning and preparedness for transport accidents involving radioactive material

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this Guide is to provide assistance to public authorities and others (including consignors and carriers of radioactive materials) who are responsible for ensuring safety in establishing and developing emergency response arrangements for responding effectively to transport accidents involving radioactive materials. This Guide is concerned mainly with the preparation of emergency response plans. It provides information which will assist those countries whose involvement with radioactive materials is just beginning and those which have already developed their industries involving radioactive materials and attendant emergency plans, but may need to review and improve these plans. The need for emergency response plans and the ways in which they are implemented vary from country to country. In each country, the responsible authorities must decide how best to apply this Guide, taking into account the actual shipments and associated hazards. In this Guide the emergency response planning and response philosophy are outlined, including identification of emergency response organizations and emergency services that would be required during a transport accident. General consequences which could prevail during an accident are described taking into account the IAEA Regulations for the Safe Transport of Radioactive Material. 43 refs, figs and tabs

  17. Telecommunications Network Plan

    International Nuclear Information System (INIS)

    1989-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affected by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM's information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program's Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs

  18. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  19. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  20. Limited Uptake of Planned Intrauterine Devices During the Postpartum Period.

    Science.gov (United States)

    Salcedo, Jennifer; Moniaga, Natalie; Harken, Tabetha

    2015-08-01

    The primary objective of this study was to determine the percentage of women with a documented plan for postpartum intrauterine device (IUD) insertion who had a device inserted within 8 weeks of delivery. The secondary objective was to determine factors associated with successful initiation of postpartum IUDs as planned. We conducted a retrospective chart review of women who had at least one prenatal visit and delivered a viable pregnancy at our academic medical center. Methods of planned and established postpartum contraceptive methods were recorded, as well as demographic information and documented reasons for failure to initiate planned intrauterine contraception. A total of 110 women planned postpartum IUD placement. Of these women, 84 (76%) presented for at least one postpartum appointment. Only 22.6% (95% confidence interval 13.7-31.5) of those presenting for postpartum follow-up underwent IUD placement within 8 weeks of delivery. Women planning postpartum IUD insertion were just as likely as women with no planned postpartum contraceptive method to fail to establish contraception within 8 weeks (P = 0.55). Failure to establish planned postpartum intrauterine contraception occurs frequently, even in a setting with a high rate of postpartum follow-up.

  1. Highly enriched uranium (HEU) storage and disposition program plan

    International Nuclear Information System (INIS)

    Arms, W.M.; Everitt, D.A.; O'Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables

  2. Standard Practice for Preparation of Aerospace Contamination Control Plans

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP): 1.1.1 Cleanliness requirements for deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations. 1.1.2 Implementation plans to achieve, verify, and maintain the specified cleanliness re...

  3. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  4. 9 CFR 108.3 - Preparation of plot plans.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Preparation of plot plans. 108.3... LICENSED ESTABLISHMENTS § 108.3 Preparation of plot plans. Plot plans shall show all of the buildings on a... on the plot plan the use of immediate adjacent properties such as, residential area, pasture, box...

  5. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    Science.gov (United States)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  6. Social Foundation of Scenario Planning

    DEFF Research Database (Denmark)

    Rowland, Nicholas James; Spaniol, Matthew Jon

    2017-01-01

    In this article, the authors establish that models of scenario planning typically involve a series of phases, stages, or steps that imply a sequenced (i.e., linear or chronological) process. Recursive models, in contrast, allow phases to repeat, thus, incorporating iteration. The authors acknowle......In this article, the authors establish that models of scenario planning typically involve a series of phases, stages, or steps that imply a sequenced (i.e., linear or chronological) process. Recursive models, in contrast, allow phases to repeat, thus, incorporating iteration. The authors...... from science and technology studies (STS) on knowledge production, the authors explain transition from one phase to the next and iteration between and within phases based on social negotiation. To this end, the authors examine the interplay between the “scenario development” phase and the “scenario use......” phase of a planning process with a non-governmental organization in Denmark. The upshot for facilitators is practical insight into how transition between phases and phase iteration in scenario planning can be identified, leveraged, and, thus, managed. The upshot for scholars is a related insight...

  7. Discrepancies Between Planned and Actual Operating Room Turnaround Times at a Large Rural Hospital in Germany

    Directory of Open Access Journals (Sweden)

    Regula Morgenegg

    2018-01-01

    retrospective study examined the OR turnaround data of 875 elective surgery cases scheduled at the Marienhospital, Vechta, Germany, between July and October 2014. The frequency distributions of planned and actual OR turnaround times were compared and correlations between turnaround times and various factors were established, including the time of day of the procedure, patient age and the planned duration of the surgery. Results: There was a significant difference between mean planned and actual OR turnaround times (0.32 versus 0.64 hours; P <0.001. In addition, significant correlations were noted between actual OR turnaround times and the time of day of the surgery, patient age, actual duration of the procedure and staffing changes affecting the surgeon or the medical specialty of the surgery (P <0.001 each. The quotient of actual/planned OR turnaround times ranged from 1.733–3.000. Conclusion: Significant discrepancies between planned and actual OR turnaround times were noted during the study period. Such findings may be potentially used in future studies to establish a tool to improve OR planning, measure OR management performance and enable benchmarking.

  8. Establishment and Operation of User Facilities

    International Nuclear Information System (INIS)

    Cho, Yong Sub; Kwon, Hyeok Jung; Kim, Kye Ryung

    2008-05-01

    PEFP(Proton Engineering Frontier Project) has launched on a new enterprise to develop the technologies for the future relating to the proton beam and spin-off technologies in 2002. PEFP planned to supply 20MeV and 100MeV proton beam by the development of the 100MeV, 20mA linear accelerator during ten years from 2002 to 2012. The final goal of this project is establishment of 20MeV and 100MeV user facilities. To do this, we must develop the key technologies for establishing user facilities. Before the main facilities are normally operated, we have established the test user facilities to support various kinds of users' basic experiments and pilot studies. The necessity of this research are as follows; - Domestic achievement of key technologies for the development and design of the user facilities for the several tens to hundreds MeV class high current proton beam - Beam application researches can be revitalized and improved the efficiency by the establishment and operation of user facilities and test facilities. - Ion implantation facilities have contributed to increase Industrial applications - It is more effective in saving money that users use the PEFP's user facility than other country's user facilities. - It is possible to contribute to the local society and commercialize the beam application technologies by the establishment of PEFP's research branch in Kyungju

  9. ERISA and health plans.

    Science.gov (United States)

    Schmidt, P; Mazo, J; Ladenheim, K

    1995-11-01

    This Issue Brief is designed to provide a basic understanding of the relationship of the Employee Retirement Income Security Act of 1974 (ERISA) to health plans. It is based, in part, on an Employee Benefit Research Institute-Education and Research Fund (EBRI-ERF) educational briefing held in March 1995. This report includes a section by Peter Schmidt of Arnold & Porter, a section about multiemployer plans written by Judy Mazo of The Segal Company; and a section about ERISA and state health reform written by Kala Ladenheim of the Intergovernmental Health Policy Project. Starting in the late 1980s, three trends converged to make ERISA a critical factor in state health reforms: increasingly comprehensive state health policy experimentation; changes in the makeup of the insurance market (including the rise in self-insurance and the growth of managed care); and increasingly expansive interpretations of ERISA by federal courts. The changing interpretations of ERISA's relationship to three categories of state health initiatives--insurance mandates, medical high risk pools, and uncompensated care pools--illustrate how these forces are playing out today. ERISA does have a very broad preemptive effect. Federal statutes do not need to say anything about preemption in order to preempt state law. For example, if there is a direct conflict, it would be quite clear under the Supremacy Clause [of the U.S. Constitution] that ERISA, or any federal statue, would preempt a directly conflicting state statute. States can indirectly regulate health care plans that provide benefits through insurance contracts by establishing the terms of the contract. And they also raise money by imposing premium taxes. But they cannot do the same with respect to self-funded plans. That is one of the factors that has caused a great rise in the number of self-funded plans. State regulation [of employee benefits] can create three kinds of problems: cost of taxes, fees, or other charges; cost of dealing

  10. Challenge to establishment of nuclear fuel cycle

    International Nuclear Information System (INIS)

    Nakajima, Ichiro

    2000-01-01

    Japan Nuclear Cycle Development Inst. (JNC) has promoted some efforts on introduction of business management cycle system integrated on safety security and business management, planning a safety conservation system with effectiveness concept on risk, and their practice steadily and faithfully. Here were described on some characteristic items on effort of safety promotion since establishment of JNC. And, here were also introduced on outlines of some research actions, at a center of research and development on a high breeding reactor and its relating cycle technology carried out at present by JNC under aiming at establishment of the nuclear fuel recycling, that is to say the nuclear fuel cycle, in Japan to upgrade the nuclear security more and more. (G.K.)

  11. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    Lindner, E.N.

    2000-01-01

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that is affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  12. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    Lindner, E.N.

    2000-01-01

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  13. Welfare and evacuation sub-plan: APTCARE - Lucas Heights

    International Nuclear Information System (INIS)

    1985-11-01

    This Sub-plan has been prepared as a contingency plan to the APTCARE document - A plan to cope with an accident at the Australian Atomic Energy Commission's Research Establishment at Lucas Heights. It details procedures to be followed for the evacuation and welfare of citizens residing in areas outside the Commission's establishment in the event that their health or safety is threatened by reason of an accident at the nuclear reactor facility which could have off-site implications. Additionally, it lists roles and tasking assignments of various counter-disaster response and support agencies in such an occurrence

  14. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    International Nuclear Information System (INIS)

    2012-01-01

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  15. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  16. AUDIT plan documenting method

    International Nuclear Information System (INIS)

    Cornecsu, M.

    1995-01-01

    The work describes a method of documenting the AUDIT plan upon the basis of two quantitative elements resulting from quality assurance program appraisal system function implementation degree as established from the latest AUDIT performed an system function weight in QAP, respectively, appraised by taking into account their significance for the activities that are to be performed in the period for which the AUDITs are planned. (Author) 3 Figs., 2 Refs

  17. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  18. 48 CFR 3052.216-72 - Performance evaluation plan.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... CONTRACT CLAUSES Text of Provisions and Clauses 3052.216-72 Performance evaluation plan. As prescribed in... Evaluation Plan (DEC 2003) (a) A Performance Evaluation Plan shall be unilaterally established by the...

  19. 242-A Evaporator waste analysis plan. Revision 4

    International Nuclear Information System (INIS)

    Basra, T.S.; Mulkey, C.H.

    1994-01-01

    This waste analysis plan (WAP) provides the plan for obtaining information needed for proper waste handling and processing in the 242-A Evaporator located on the Hanford Site. Regulatory and safety issues are addressed by establishing boundary conditions for waste received and treated at the 242-A Evaporator. The boundary conditions are set by establishing limits for items such as potential exothermic reactions, waste compatibility, and control of vessel vent organic emissions. Boundary conditions are also set for operational considerations and to ensure waste acceptance at receiving facilities. The issues that are addressed in this plan include prevention of exotherms in the waste, waste compatibility, vessel vent emissions, and compatibility with the liner in the Liquid Effluent Retention Facility (LERF). The 242-A Evaporator feed stream is separated into two liquid streams: a concentrated slurry stream and a process condensate. A gaseous exhaust stream is also produced. The slurry contains the majority of the radionuclides and inorganic constituents. This stream is pumped back to the double shell tanks (DSTs) and stored for further treatment after being concentrated to target levels. The process condensate (PC) is primarily water that contains trace amounts of organic material and a greatly reduced concentration of radionuclides. The process condensate is presently stored in the (LERF) until it can be further processed in the Effluent Treatment Facility once it is operational

  20. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  1. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  2. Plan Nacional de Desarrollo y Seguridad 1971-1975 (National Plan for Development and Security, 1971-1975).

    Science.gov (United States)

    Boletin del Centro Nacional de Documentacion e Informacion Educativa, 1971

    1971-01-01

    This article discusses the education provisions established in the Argentine Plan for Development and Security (1971-1975). The statements on educational development call for a diagnostic study of the current cultural and educational situation, the establishment of objectives and strategies, goals for each level of education, steps for the…

  3. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  4. 77 FR 37614 - Tariffs (Other Than Tariff Review Plan); Connect America Fund; A National Broadband Plan for Our...

    Science.gov (United States)

    2012-06-22

    ... (Other Than Tariff Review Plan); Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY... with the Commission's Connect America Fund, Report and Order (Order). The Commission submitted...

  5. 42 CFR 410.100 - Included services.

    Science.gov (United States)

    2010-10-01

    ... service; however, maintenance therapy itself is not covered as part of these services. (c) Occupational... increase respiratory function, such as graded activity services; these services include physiologic... rehabilitation plan of treatment, including physical therapy services, occupational therapy services, speech...

  6. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  7. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    Science.gov (United States)

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  8. Planning for seven generations: Energy planning of American Indian tribes

    International Nuclear Information System (INIS)

    Brookshire, Daniel; Kaza, Nikhil

    2013-01-01

    The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development

  9. Automation model of sewerage rehabilitation planning.

    Science.gov (United States)

    Yang, M D; Su, T C

    2006-01-01

    The major steps of sewerage rehabilitation include inspection of sewerage, assessment of structural conditions, computation of structural condition grades, and determination of rehabilitation methods and materials. Conventionally, sewerage rehabilitation planning relies on experts with professional background that is tedious and time-consuming. This paper proposes an automation model of planning optimal sewerage rehabilitation strategies for the sewer system by integrating image process, clustering technology, optimization, and visualization display. Firstly, image processing techniques, such as wavelet transformation and co-occurrence features extraction, were employed to extract various characteristics of structural failures from CCTV inspection images. Secondly, a classification neural network was established to automatically interpret the structural conditions by comparing the extracted features with the typical failures in a databank. Then, to achieve optimal rehabilitation efficiency, a genetic algorithm was used to determine appropriate rehabilitation methods and substitution materials for the pipe sections with a risk of mal-function and even collapse. Finally, the result from the automation model can be visualized in a geographic information system in which essential information of the sewer system and sewerage rehabilitation plans are graphically displayed. For demonstration, the automation model of optimal sewerage rehabilitation planning was applied to a sewer system in east Taichung, Chinese Taiwan.

  10. A Study on Establishment of Nuclear Power Plant Technical Support System and Activation Plan

    International Nuclear Information System (INIS)

    Wi, M. H.; Park, W. S.; Lee, H. S.; Kim, J. H.; Won, B. C.; Kim, Y. H.; Goo, D. S.; Choi, H. B.

    2009-11-01

    This report includes activities related to establishment of 'BaroBaro nuclear plant technical support center', 'selection of nuclear plant applicable technology', and 'various information interchange between KAERI and nuclear power plant'. 'BaraBaro center was newly organized to support on resolving the technical difficulties in operation of nuclear power plant'. The center consists of 10 technical parts and a leading expert is assigned to each part to support more efficiently. This center is always served for 24 hour. The plant operators can register their problem to the center by a call, e-mail, or internet and they can receive the answer about what they issued from KAERI experts. To make a brochure, we selected 32 technologies which are applicable in nuclear plant without additional R and D activity. The brochure was distributed to the officer in charge of nuclear plant operations. Various meetings were held to increase interchange of experience and technology between KAERI and nuclear power plant and we discussed many different issues at that meeting

  11. PLANNING THE NETWORKING OF ODL INSTITUTIONS FOR ESTABLISHING INTEGRATED DISTANCE EDUCATION SYSTEM IN INDIA

    Directory of Open Access Journals (Sweden)

    Pankaj KHANNA

    2011-07-01

    Full Text Available It is proposed to establish an Integrated Distance Education System in India by designing modern technology based information communication network, connecting all its ODL (Open and Distance Learning institutions to the headquarters of the ODL system in India. The principle roles to be performed by such a system have been discussed; according to which it would enable, educate and empower every member of the academic community including distance learners so as to provide them quality distance education. The connectivity between the ODL institutions would be achieved through the use of VPN (Virtual Private Network involving wireless networking and optical networking. Various benefits of providing VPN connectivity to the ODL institutions in India, such as cost effectiveness, security, and shared applications/services have also been discussed. Thus, the networking of all the ODL institutions in India would provide a national framework so as to build an excellent Integrated Distance Education System necessary for providing equity and quality distance education at national level.

  12. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  13. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  14. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  15. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  16. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  17. Establishment of nuclear data evaluation system (I)

    International Nuclear Information System (INIS)

    Chang, Jong Hwa; Lee, Chang Kun; Kim, Jeong Do; Kim, Young Sik; Kim, Young Jin; Kim, Hyung Guk; Kil, Chung Sup; Kim, Kang Suk

    1994-08-01

    Nuclear data is fundamental data for development of new type of nuclear, upgrade of nuclear fuel, treatment of radwaste, research on fusion reactor, radioisotope usage, and nuclear medical therapy. Nuclear data is produced with experiments. However rack of experimental data for thousands of nuclides and various reaction types makes it essential to do statistical evaluation and theoretical interpolation. This study is intended to join international cooperation after establishing domestic basis for nuclear data evaluation work. This project is the first year of five year plan to do followings: 1) Establishment of database system to collect experimental data, 2) Setup of computer assistance system for evaluation work, 3) Verification of established system by test evaluation of selected nuclide reaction. The system has a collection of mass data of nuclides, computer codes for test evaluation of total cross section of 0-16 and collection of EXFOR format data for 0-16. This system will be improved continuously on next years. (Author)

  18. [Diversification is the financial alternative for family planning].

    Science.gov (United States)

    Castro Villamil, R

    1991-12-01

    During the 1960s, when family planning services were institutionalized in Colombia by PROFAMILIA, abundant foreign assistance was readily available. Few questions were asked about the longterm funding of family planning programs or the need for financial self-sufficiency. The emphasis was on program development without great attention to costs. Beginning around the early 1980s, international donors began to place a higher priority and greater investment in the incipient family planning programs of less developed countries. At present a greater number and higher quality of services are being demanded from PROFAMILIA at the lowest possible cost. Efficiency has replaced efficacy as the overriding goal. PROFAMILIA, due to its excellent results, has lost priority in the eyes of international donors. It has therefore reoriented its financing strategies toward a short, medium, and long term plan to reduce its financial dependence on international donor agencies. Self-sufficiency could be increased through various means, including total government subsidy, charging fees for services and materials sufficient to cover program costs, establishing services and marketing programs aside from family planning programs for the specific purpose of obtaining funds to cover program deficits, or establishing accounting and operational controls to reduce costs through greater efficiency. But large government subsidies are unlikely in a time of budgetary constraints, and raising fees for family planning users would exclude a large number of low-income clients from the family planning program. Cost reduction and implementation of diversified programs should therefore be emphasized for the present. The diversified program should be related to family planning so that use can be made of idle resources. PROFAMILIA has emphasized surgical procedures and medical consultations to utilize clinic facilities more fully and to increase income without increasing fixed costs. In 1990, foreign

  19. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  20. Birth planning in Cuba: a basic human right.

    Science.gov (United States)

    Swanson, J M

    1981-01-01

    This paper reports on the development of birth planning in Cuba and strategies that are relevant to nurses in the communities of Cuba. Cuba reduced its crude birth rate by 40% from 1964-75 without formal family planning programs and resources. By 1975, Cuba had achieved the lowest birth rate in Latin America (21/1000) except Barbados (19/1000). By 1978, Cuba's crude birth rate declined to a low of 15.3/1000. The demographic transition in Cuba has been a process of equalization by: 1) community participation to ensure basic human rights for everyone, 2) increasing the status of women while providing child care centers, 3) providing equal availability of health care services including contraceptive services, sterilization, and abortion, and 4) focusing on individual birth choice, not on limiting population growth. Emphasis in Cuba for reducing fertility has been put on literacy, education, and infant mortality. The illiteracy rate in 1961 decreased from 20% to 4%. Infant mortality decreased from 38.8/1000 live births in 1970 to 22.3/1000 in 1978. 1/3 of Cuban women were participating fully in the labor force in 1978. Polyclinics have been established as preventive care medical centers throughout Cuba and health care is free. Family planning options are integrated into routine primary health care at polyclinics and assure equal access to the total Cuban population. Abortion is freely available and increased to 61/1000 in 1976. The implications for nursing are that: 1) the traditional work of nurses places them in a key position to help extend basic human rights beyond current levels, 2) nurses can initiate discussions of birth planning with women and men in a variety of settings, and 3) nurses can increase case-finding related to birth planning needs both in health care classes or within established groups in the community.

  1. Finite Progressive Planning for the Assembly Process in Footwear

    Science.gov (United States)

    Reyes, John; Aldás, Darwin; Salazar, Edisson; Armendáriz, Evelyn; Álvarez, Kevin; Núñez, José; García, Mario

    2017-06-01

    The scheduling of the operations of a manufacturing system is recognized for its efficiency in establishing a characteristic rate of production based on the forecasting of the ending date of an order. However, progressive planning focused on the footwear industries has not been studied in detail, since it is limited by the use of machines and supply according to the demand of the production line, whose development is based on just in time. The study proposes a finite progressive planning model in the area of footwear assembly that begins with analysis of the demand and identification of manufacturing constraints in order to establish an optimal ordering sequence. The results show manufacturing requirements through production orders that automatically determine production shifts per order, through experimentation of scenarios, the 25% increase in productivity indicators and a 31% improvement in efficiency are established. This improvement represents higher benefits for the industrial sector when establishing planning in the workplace.

  2. Oak Ridge National Laboratory Institutional Plan FY 1984-FY 1989

    International Nuclear Information System (INIS)

    1983-11-01

    In this plan, Oak Ridge National Laboratory (ORNL) continues to be committed to scientific and technological research that is based on technical excellence and innovation and that provides a foundation for and a stimulus to broader and more sustained economic growth. DOE is being asked to assist in establishing a new program for Laboratory cooperation with industry, beginning with an initial focus on materials science. The current Institutional Plan thus projects growth in the materials science area as well as in other basic physical science areas and suggests a new initiative designed to extend the various technology transfer activities and to make them more effective by using ORNL as the trial Laboratory for some of these different approaches. This Institutional Plan projects a stable future for ORNL, with only modest amounts of growth in selected areas of research for the FY 1984-FY 1989 planning cycle. Summaries of the overall picture of the proposed budget and personnel levels for the current planning cycle are included. Scientific programs, laboratory resource development, and private sector interactions are discussed

  3. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  4. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  5. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  6. SU-E-J-149: Establishing the Relationship Between Pre-Treatment Lung Ventilation, Dose, and Toxicity Outcome

    International Nuclear Information System (INIS)

    Mistry, N; D'Souza, W; Sornsen de Koste, J; Senan, S

    2014-01-01

    Purpose: Recently, there has been an interest in incorporating functional information in treatment planning especially in thoracic tumors. The rationale is that healthy lung regions need to be spared from radiation if possible to help achieve better control on toxicity. However, it is still unclear whether high functioning regions need to be spared or have more capacity to deal with the excessive radiation as compared to the compromised regions of the lung. Our goal with this work is to establish the tools by which we can establish a relationship between pre-treatment lung function, dose, and radiographic outcomes of lung toxicity. Methods: Treatment planning was performed using a single phase of a 4DCT scan, and follow-up anatomical CT scans were performed every 3 months for most patients. In this study, we developed the pipeline of tools needed to analyze such a large dataset, while trying to establish a relationship between function, dose, and outcome. Pre-treatment lung function was evaluated using a recently published technique that evaluates Fractional Regional Ventilation (FRV). All images including the FRV map and the individual follow-up anatomical CT images were all spatially matched to the planning CT using a diffusion based Demons image registration algorithm. Change in HU value was used as a metric to capture the effects of lung toxicity. To validate the findings, a radiologist evaluated the follow-up anatomical CT images and scored lung toxicity. Results: Initial experience in 1 patient shows a relationship between the pre-treatment lung function, dose and toxicity outcome. The results are also correlated to the findings by the radiologist who was blinded to the analysis or dose. Conclusion: The pipeline we have established to study this enables future studies in large retrospective studies. However, the tools are dependent on the fidelity of 4DCT reconstruction for accurate evaluation of regional ventilation. Patent Pending for the technique

  7. 40 CFR 35.917 - Facilities planning (step 1).

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning (step 1). 35.917... Facilities planning (step 1). (a) Sections 35.917 through 35.917-9 establish the requirements for facilities... the facilities planning provisions of this subpart before award of step 2 or step 3 grant assistance...

  8. Applying the model of Goal-Directed Behavior, including descriptive norms, to physical activity intentions: A contribution to improving the Theory of Planned Behavior

    Science.gov (United States)

    The theory of planned behavior (TPB) has received its fair share of criticism lately, including calls for it to retire. We contributed to improving the theory by testing extensions such as the model of goal-directed behavior (MGDB, which adds desire and anticipated positive and negative emotions) ap...

  9. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  10. TWRS Privatization Phase 1 Master Site Plan

    International Nuclear Information System (INIS)

    PARAZIN, R.J.

    1999-01-01

    The U.S. Department of Energy (DOE) has chosen to accomplish the Tank Waste Remediation System disposal mission via privatization. The disposal mission has been divided into two privatization phases. Phase I, a 'proof of concept' phase, will establish and demonstrate the technical, commercial, and procurement capabilities necessary far privatization to proceed. Once established, privatization will be expanded in the form of a second phase (Phase II) to dispose of the remainder of the tank waste. In conjunction with preparation of the Tank Waste Remediation System (TWRS) Privatization Request for Proposals (RFP)(RL, 1996), a location was selected for the Phase I demonstration facilities (Shord, 1996). The location selected was the area previously developed and characterized for the Grout Disposal Site, adjoining the 200 East Area. The site is of sufficient size for a Private Contractor (PC) to carry out pretreatment, immobilization, and vitrification operations and possesses the required characteristics (e.g., close to feed tanks) to best facilitate the Phase I operations. This overall long-range Master Site Plan (MSP) has been developed to establish a ''baseline'' for the (TWRS) Privatization Phase I (TPPI) PC Site. The MSP depicts the planned layout for the PC Site along with various interfaces between the site and other Hanford utilities and functions. The complete integration of TPPl MSP with overall Hanford Site planning process will assist in establishing the PC site and the necessary priorities to meet the Hanford cleanup mission. The MSP has been developed systematically into a comprehensive, safe, flexible, logical and cost-effective plan. The general philosophy behind the preparation of a MSP for the TPPl program is that it will serve as a single source documentation of the planning for the development of the TPPl complex. The effort will plan temporary and permanent land use, utilities, and traffic flow for the overall program. It will identify needs

  11. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  12. Management of Logistics Planning

    OpenAIRE

    Bjørnar Aas; Stein W. Wallace

    2010-01-01

    Logistics problems are gradually becoming more complex and a better understanding of logistics management as a subject is a key to deal with the new challenges. A core element of logistics management is logistics planning, which substitutes for low customer service levels, high waste, and the use of buffers and slacks in the execution of logistic activities. Furthermore, the availability of information and problem-solving capabilities are established as the core parts of logistics planning. B...

  13. Institutional Framework for Collaborative Urban Planning in Afghanistan in view of the Transferring Process of International Urban Planning Systems

    OpenAIRE

    Habib Ahmad Javid; Tetsuo Kidokoro

    2015-01-01

    This article provides an overview of Afghanistan’s urban planning institutional change in certain historical periods, particular dilemmas within the current urban planning system and its gradual shift from totalitarian urban planning approaches practiced during 1960s - 1980s to a different form of planning being practiced by the current government. In addition, it will seek to analyze the ease and tension caused by the three recent phenomena that have emerged after the establishment of a new ...

  14. When planners deal with change: Stories of Performativity in the politics of urban planning in two Scandinavian cities

    DEFF Research Database (Denmark)

    Lissandrello, Enza

    planning professionals become carriers of specific abilities that shape the possibilities of action and innovation in urban planning practice. It also argues that planning is performed by a plurality of actors, discourses, stages and politics but that in addition, urban planning proceeds by the acts...... the terrain of changing structural conditions altering current urban planning practice in two Scandinavian cities. Inspired by John Forester, their stories are here as lessons about what planning practitioners do in practice when facing challenges in their work. The aim is to explore an interpretation...... within a set of meanings and forms of legitimation. Across this analytic approach, some dimensions of transitions in urban planning include new institutional conditions and the actions of public planners, their performativity and their role in establishing innovative policy-making and planning practices...

  15. PFP dangerous waste training plan

    International Nuclear Information System (INIS)

    Khojandi, J.

    1996-01-01

    This document establishes the minimum training requirements for the Plutonium Finishing Plant (PFP) personnel who are responsible for management of dangerous waste. The training plan outlines training requirements for handling of solid dangerous waste during generator accumulation and liquid dangerous waste during treatment and storage operations. The implementation of this training plan will ensure the PFP facility compliance with the training plan requirements of Dangerous Waste Regulation. Chapter 173-303-330. Washington Administrative Code (WAC). The requirements for such compliance is described in Section 11.0 of WHC-CM-7-5 Environmental Compliance Manual

  16. Reform and Harmonization of Legislation concerning Environment and Spatial Planning towards Sustainable Development

    Directory of Open Access Journals (Sweden)

    Maret Priyanta

    2015-12-01

    Full Text Available In an effort to achieve of state responsibility, national development carried out by all components of the nation. National development formulated and established by the government through a system of national development planning. In the implementation of development activities that use natural resources, legislation in the field of environment and spatial planning is an important aspect as the legal basis, in which the substance and purpose of the rules is not only derived from legal aspect, but also derived from sciences field environment and spatial planning. This research uses normative juridical approach, through the method of approach to legislation, the conceptual approach and an analytical approach. The scope of this normative juridical research includes a study of the principles of law, an inventory study of positive law and legal research on systematic. Regulatory issues in the field of environment and spatial planning in Indonesia in the context of sustainable development was originally rooted in the process of establishing legislation. In terms of the substance of which is set to have a tendency no longer rooted in the sciences that underlie environmental law and spatial. Concept of reform and harmonization of legislation field of environment and spatial planning in Indonesia in the context of sustainable development must be assessed in terms of the scientific approach to the whole holistic, inter and multidisciplinary and cross-sectoral to harmonize science related to the environment and spatial planning with the principles, theory and philosophy in Legal studies.

  17. ACT Plan: Technical Manual. 2013/2014

    Science.gov (United States)

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  18. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    International Nuclear Information System (INIS)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.; Thieme, R.E.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a ''transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as ''buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containing mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs

  19. Oak Ridge reservation land-use plan

    Energy Technology Data Exchange (ETDEWEB)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  20. HWMA/RCRA Closure Plan for the Fluorinel Dissolution Process Makeup and Cooling and Heating Systems Voluntary Consent Order SITE-TANK-005 Action Plan Tank Systems INTEC-066, INTEC-067, INTEC-068, and INTEC-072

    International Nuclear Information System (INIS)

    M.E. Davis

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards

  1. HWMA/RCRA Closure Plan for the Fluorinel Dissolution Process Makeup and Cooling and Heating Systems Voluntary Consent Order SITE-TANK-005 Action Plan Tank Systems INTEC-066, INTEC-067, INTEC-068, and INTEC-072

    Energy Technology Data Exchange (ETDEWEB)

    M.E. Davis

    2007-05-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards.

  2. The administrative protection of local planning authorities against decisions on a higher level

    International Nuclear Information System (INIS)

    Steinberg, R.

    1982-01-01

    The author discusses governmental planning that influences local planning's scope of organization and limits local sovereinty which is established as a guarantee for local self-government. Those conflicts occurr in the case of country planning, various specific plans (such as road construction an tower and country planning, nature conservation and landscape planning), and planning permits (decisions to establish new plans according to civil air regulations and permits according to atomic law). Then the author describes the possibilities of legal protection in the case of an action for avoidance which he illustrates with some conflicting cases, laying special emphasis on the right of action of a community, and on the justification of the action for avoidance. (HSCH) [de

  3. Olfactory neuroblastoma: the long-term outcome and late toxicity of multimodal therapy including radiotherapy based on treatment planning using computed tomography

    International Nuclear Information System (INIS)

    Mori, Takashi; Onimaru, Rikiya; Onodera, Shunsuke; Tsuchiya, Kazuhiko; Yasuda, Koichi; Hatakeyama, Hiromitsu; Kobayashi, Hiroyuki; Terasaka, Shunsuke; Homma, Akihiro; Shirato, Hiroki

    2015-01-01

    Olfactory neuroblastoma (ONB) is a rare tumor originating from olfactory epithelium. Here we retrospectively analyzed the long-term treatment outcomes and toxicity of radiotherapy for ONB patients for whom computed tomography (CT) and three-dimensional treatment planning was conducted to reappraise the role of radiotherapy in the light of recent advanced technology and chemotherapy. Seventeen patients with ONB treated between July 1992 and June 2013 were included. Three patients were Kadish stage B and 14 were stage C. All patients were treated with radiotherapy with or without surgery or chemotherapy. The radiation dose was distributed from 50 Gy to 66 Gy except for one patient who received 40 Gy preoperatively. The median follow-up time was 95 months (range 8–173 months). The 5-year overall survival (OS) and relapse-free survival (RFS) rates were estimated at 88% and 74%, respectively. Five patients with stage C disease had recurrence with the median time to recurrence of 59 months (range 7–115 months). Late adverse events equal to or above Grade 2 in CTCAE v4.03 were observed in three patients. Multimodal therapy including radiotherapy with precise treatment planning based on CT simulation achieved an excellent local control rate with acceptable toxicity and reasonable overall survival for patients with ONB

  4. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D ampersand D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S ampersand M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D ampersand D contractors are required to prepare formal plans that document the S ampersand M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D ampersand D Program

  5. An action plan for radioactive substances regulation

    International Nuclear Information System (INIS)

    1998-01-01

    This document sets out an action plan for the Agency's Radioactive Substances Regulation function. Our vision is to secure continuous improvement in the protection of the public and the environment from the harmful effects of radioactive substances. Radioactive Substances Regulation will work with others to realise this vision and contribute to the Agency's role in achieving sustainable development. We will also work to ensure that the Agency achieves its objectives in an efficient, consistent and integrated way. The main elements of our Action Plan are as follows: establishing indicators of sustainability and the means and methods of monitoring them; establishing performance indicators and a programme of targets and objectives to be achieved; establishing a database of all premises subject to RSA93 and to use it for work planning, resource targeting, and improvement to radioactive waste management; provision of systems of procedures and technical guidance to ensure nationally consistent and cost- effective regulation; establishing systems to audit the implementation of the procedures and guidance; ensuring quality of regulation by defining technical competencies of inspectors and the training programmes to secure them; an R and D programme targeted on improving radioactive waste management and radioactive substances regulation; and full and effective participation in development of national policy

  6. 76 FR 56767 - Request for Information Regarding State Flexibility To Establish a Basic Health Program Under the...

    Science.gov (United States)

    2011-09-14

    ... Affordable Care Act specifies that a Basic Health Program will establish a competitive process for entering... entities are involved, or will likely be involved in this planning process? 6. What guidance or information would be helpful to States, plans, and other stakeholders as they begin the planning process? What other...

  7. [Endodontically treated teeth. Success--failure. Endorestorative treatment plan].

    Science.gov (United States)

    Zabalegui, B

    1990-01-01

    More and more often the general dentist is finding the presence of endodontically treated teeth during his treatment planning procedure. He has to ask himself if the endo-treated tooth functions and will continue to function function successfully, when deciding which final endo-restorative procedure to apply. For this reason the dentist or the endodontist with whom he works should clinically evaluate these teeth, establish a diagnostic criteria of their success or failure and a treatment plan according to the prognosis. The purpose of this article is to offer an organized clinical view of the steps to follow when evaluating an endodontically treated tooth and how to establish a final endo-restorative plan.

  8. Financial sustainability planning for immunization services in Cambodia.

    Science.gov (United States)

    Soeung, Sann Chan; Grundy, John; Maynard, Jim; Brooks, Alan; Boreland, Marian; Sarak, Duong; Jenkinson, Karl; Biggs, Beverley-Ann

    2006-07-01

    The expanded programme of immunization was established in Cambodia in 1986. In 2002, 67% of eligible children were immunized, despite significant health sector and macro-economic financial constraints. A financial sustainability planning process for immunization was introduced in 2002, in order to mobilize national and international resources in support of the achievement of child health objectives. The aim of this paper is to outline this process, describe its early impact as an advocacy tool and recommend additional strategies for mobilizing additional resources for health. The methods of financial sustainability planning are described, including the advocacy strategies that were applied. Analysis of financial sustainability planning results indicates rising programme costs associated with new vaccine introduction and new technologies. Despite this, the national programme has demonstrated important early successes in using financial sustainability planning to advocate for increased mobilization of national and international sources of funding for immunization. The national immunization programme nevertheless faces formidable system and financial challenges in the coming years associated with rising costs, potentially diminishing sources of international assistance, and the developing role of sub-national authorities in programme management and financing.

  9. Progressive IRP Models for Power Resources Including EPP

    Directory of Open Access Journals (Sweden)

    Yiping Zhu

    2017-01-01

    Full Text Available In the view of optimizing regional power supply and demand, the paper makes effective planning scheduling of supply and demand side resources including energy efficiency power plant (EPP, to achieve the target of benefit, cost, and environmental constraints. In order to highlight the characteristics of different supply and demand resources in economic, environmental, and carbon constraints, three planning models with progressive constraints are constructed. Results of three models by the same example show that the best solutions to different models are different. The planning model including EPP has obvious advantages considering pollutant and carbon emission constraints, which confirms the advantages of low cost and emissions of EPP. The construction of progressive IRP models for power resources considering EPP has a certain reference value for guiding the planning and layout of EPP within other power resources and achieving cost and environmental objectives.

  10. Population control II: The population establishment today.

    Science.gov (United States)

    Hartmann, B

    1997-01-01

    Although population assistance represents a relatively small share of official development assistance, it influences many other aspects of development planning. The organizations that comprise the population establishment have a common purpose--the reduction of population growth in the Third World--but they are not homogeneous and sometimes have conflicting goals and strategies. National governments, multilateral agencies, nongovernmental organizations, foundations, academic centers, and pressure groups all contribute to creating and sustaining what has become a virtual population control industry. Through scholarships, travel grants, awards, and favorable publicity, Third World elites have been encouraged to join the population establishment. The World Bank, the U.S. Agency for International Development, and the U.N. Fund for Population Activities have pursued explicit strategies for pressuring Third World governments to design and implement population policies, most recently in Africa.

  11. PROBLEMS DRAFTING OF LAND USE TO ESTABLISH THE LIMITS RESTRICTIONS IN THE USE OF LAND AND THE OBJECT WITH REGIME

    Directory of Open Access Journals (Sweden)

    Y.Dorosh

    2016-10-01

    Full Text Available Analyzed the legal framework of restrictions in land use and their regime facilities (laws, regulations, rules, regulations, standards and classifications. Found that the current classification provides for the conduct of State Land Cadastre is flawed because it does not cover all kinds of restrictions, making impossible to use it for practical purposes. Therefore, we proposed territorial restrictions in the use of land classified by types and species. The classification confirms expediency to distinguish meaningful component of the project land to establish limits restrictions in land use and their rezhymoutvoryuyuchyh objects from the standard procedure of development for all types of project documentation provided by the Law of Ukraine "On Land Management". The article contains an updated block model for the drafting of land to establish the limits of restrictions on land use and regime facilities.The project land boundaries to establish restrictions on land use and regime facilities include: 1 drafting task on land; 2 an explanatory note; 3 the decision of the local government of drafting; 4 characterization of the natural environment; 5 certificate containing a summary of land (territory; 6 Cartogram agro-industrial groups of soils and steep slopes; 7 geodetic surveys and materials of Land Management 8 information on the current state of land use and protection (including registered in the State Land Cadastre restrictions on land use; 9 description of the territory by establishing usage of land of natural reserve fund and other environmental protection, health, recreational, historical, cultural, forestry purposes, land and water resources protection zones, restrictions in land use and their regime facilities; 10 within the limits the settlement - a copy of the graphic part of the master plan of settlement (if applicable, and outside the village - a copy of the appropriate planning documentation (if any and a copy of the decision on the

  12. Transmission solutions : a 10 year plan for the province of Ontario 2005-2014

    International Nuclear Information System (INIS)

    2005-02-01

    This paper present a 10 year transmission plan for Ontario by Hydro One Networks Inc., the largest electricity delivery company in the province. A history of Hydro One Network's activities during the past century was provided as well as information about the company and details of their mission and objectives. A list of their accomplishments during 2004 was also presented. An outline of the current transmission infrastructure system was presented. Elements of the plan include customer connections; area supply reliability; facilitation of electricity supply; and transmission needs and solutions. Plans specific to central, western, eastern and northeastern zones were also presented, including zone maps of transmission lines and generating stations. Changes included: Bill 100, the Electricity Restructuring Act in 2004 and the establishment of the Ontario Power Authority (OPA); changes to the Ontario Energy Board's Transmission System Code (TSC); government measures to increase the supply of electricity through requests for proposals (RFPs) for new renewable and clean energy; and the announcement of an increase in the amount of wind energy through the Wind Power Production Incentive program. refs., tabs., figs

  13. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  14. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  15. Non-nuclear radiological emergencies. Special plan for radiological risk of the Valencian Community

    International Nuclear Information System (INIS)

    Rodríguez Rodrigo, I.; Piles Alepuz, I.; Peiró Juan, J.; Calvet Rodríguez, D.

    2015-01-01

    After the publication of the Radiological Hazard Basic Directive, Generalitat (the regional government in Valencian Community) initiated the edition of the pertinent Special Plan, with the objective to assemble the response of all the Security and Emergency Agencies, including the Armed Forces, in a radiological emergency affecting the territory of the Valencian Community, under a single hierarchy command. Being approved and homologated the Radiological Hazard Special Plan, Generalitat has undertaken the implementation process planned to finish in June 2015. Following the same process as other Plans, implementation is organized in a first informative stage, followed of a formative and training stage, and finishing with an activation exercise of the Plan. At the end of the process, is expected that every Agency will know their functions, the structure and organization in which the intervention takes place, the resources needed, and adapt their protocols to the Plan requirements. From the beginning, it has been essential working together with the Nuclear Safety Council, as is established in the agreement signed in order to collaborate in Planning, Preparedness and Response in Radiological Emergencies. [es

  16. 45 CFR 400.115 - Establishing legal responsibility.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Establishing legal responsibility. 400.115 Section... Child Welfare Services § 400.115 Establishing legal responsibility. (a) A State must ensure that legal responsibility is established, including legal custody and/or guardianship, as appropriate, in accordance with...

  17. Development of Strategic Technology Road map for Establishing Safety Infrastructure of Fusion Energy

    International Nuclear Information System (INIS)

    Han, B. S.; Cho, S. H.; Kam, S. C.; Kim, K. T.

    2009-01-01

    The Korean Government established an 'Act for the Promotion of Fusion Energy Development (APFED)' and formulated a 'Strategy Promotion Plan for Fusion Energy Development.' KINS has carried out a safety review of KSTAR (Korea Superconducting Tokamak Advanced Research), for which an application for use was received in 2002 and the license was issued in August 2007. With respect to the APFED, 'Atomic Energy Acts (AEAs)' shall apply in the fusion safety regulation. However the AEAs are not applicable because they aim for dealing with nuclear energy. In this regard, this study was planned to establish safety infrastructure for fusion energy and to develop technologies necessary for verifying the safety. The purpose of this study is to develop a 'Strategic Technology Roadmap (STR) for establishing safety infrastructure of the fusion energy', which displays the content and development schedule and strategy for developing the laws, safety goals and principles, and safety standards applicable for fusion safety regulation, and core technology required for safety regulation of fusion facilities

  18. Is it time to abandon care planning in mental health services? A qualitative study exploring the views of professionals, service users and carers.

    Science.gov (United States)

    Brooks, Helen L; Lovell, Karina; Bee, Penny; Sanders, Caroline; Rogers, Anne

    2018-06-01

    It has been established that mental health-care planning does not adequately respond to the needs of those accessing services. Understanding the reasons for this and identifying whose needs care plans serve requires an exploration of the perspectives of service users, carers and professionals within the wider organizational context. To explore the current operationalization of care planning and perceptions of its function within mental health services from the perspectives of multiple stakeholders. Participants included 21 mental health professionals, 29 service users and 4 carers from seven Mental Health Trusts in England. All participants had experience of care planning processes within secondary mental health-care services. Fifty-four semi-structured interviews were conducted with participants and analysed utilizing a qualitative framework approach. Care plans and care planning were characterized by a failure to meet the complexity of mental health needs, and care planning processes were seen to prioritize organizational agendas and risk prevention which distanced care planning from the everyday lives of service users. Care planning is recognized, embedded and well established in the practices of mental health professionals and service users. However, it is considered too superficial and mainly irrelevant to users for managing mental health in their everyday lives. Those responsible for the planning and delivery of mental health services should consider ways to increase the relevance of care planning to the everyday lives of service users including separating risk from holistic needs assessment, using support aids and utilizing a peer workforce in this regard. © 2017 The Authors Health Expectations published by John Wiley & Sons Ltd.

  19. Basic plans of nuclear energy development and utilization for fiscal 1982 (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report by the Nuclear Safety Commission to the Prime Minister, concerning the basic plans of nuclear energy development and utilization for fiscal 1982, was presented; the NSC has decided on the plans drawn up by the Prime Minister. Nuclear power generation as the nucleus of petroleum substitutes must be developed steadily. For the purpose, nuclear fuel cycle should be established, including the securing of uranium resources, uranium enrichment, fuel reprocessing, and waste management. The contents are as follows: the strengthening of nuclear safety measures, the promotion of nuclear power generation, the establishment of nuclear fuel cycle, the development of advanced types of reactors, the research on nuclear fusion, the research and development of nuclear powered ships, the promotion of radiation utilization, the strengthening of basis for nuclear energy development and utilization, the promotion of international cooperation, the strengthening of safeguard and nuclear material protection measures, fiscal 1982 budgets related to nuclear energy. (Mori, K.)

  20. Considering a Lexicographic Plan for Gabon within the Gabonese Language Landscape

    Directory of Open Access Journals (Sweden)

    Hugues Steve Ndinga-Koumba-Binza

    2011-10-01

    Full Text Available

    ABSTRACT: This article raises a number of questions that should be dealt with in drawing up a lexicographic plan for Gabon. For which of the Gabonese languages should lexicographic units be established? This question entrains the issue of inventorying the Gabonese languages and their standardization as well as the issue of language planning for Gabon. What is the status of those foreign languages widely spoken in Gabon? What about French? Should Gabon keep importing its French dictionaries from France, or should the Gabonese compile their own French dictionaries, including French words and expressions exclusively used in Gabon? Finally, after trying to answer these questions, a number of suggestions are made for the establishment of a lexicographic plan for Gabon.

    Keywords: GABONESE LANGUAGE LANDSCAPE (GLL, LEXICOGRAPHIC PLAN FOR GABON, LANGUAGE DIVERSITY, LANGUAGE POLICY, LANGUAGE STANDARDIZATION, GABONESE LEXICOGRAPHY, NATIONAL LANGUAGE, NATIVE LANGUAGES, FOREIGN LANGUAGES

    *****

    OPSOMMING: Die oorweging van 'n leksikografiese plan vir Gaboen binne die Gaboenese taallandskap. Hierdie artikel bring 'n aantal vrae ter sprake waaraan aan-dag gegee moet word by die opstel van 'n leksikografiese plan vir Gaboen. Vir watter Gaboenese tale moet leksikografiese eenhede gestig word? Hierdie vraag bring die kwessie van die inventari-sering van die Gaboenese tale en hul standaardisering ter sprake, asook die kwessie van taalbe-planning vir Gaboen. Wat is die status van daardie vreemde tale wat algemeen in Gaboen gepraat word? Wat van Frans? Moet Gaboen voortgaan om sy Franse woordeboeke uit Frankryk in te voer, of moet hy sy eie Franse woordeboeke saamstel, met insluiting van Franse woorde en uitdrukkings wat uitsluitlik in Gaboen gebruik word? Ten slotte, nadat geprobeer is om hierdie vrae te beant-woord, word 'n aantal voorstelle gemaak vir die totstandbrenging van 'n leksikografiese plan vir Gaboen.

    Sleutelwoorde: GABOENESE

  1. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  2. Preparation of off-site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This document is issued as a lead document to facilitate preparation of specific site manuals by the Responsible Organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publication on the subject: Safety Manual on Off-Site Emergency Plan for Nuclear Installations, AERB/SM/NISD-2, 1988 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come out in a significant manner after the accidents at Chernobyl and Bhopal

  3. Cultivating men's interest in family planning in rural El Salvador.

    Science.gov (United States)

    Lundgren, Rebecka I; Gribble, James N; Greene, Margaret E; Emrick, Gail E; de Monroy, Margarita

    2005-09-01

    A pilot project in rural El Salvador tested the integration of family planning into a water and sanitation program as a strategy for increasing male involvement in family planning decison making and use. The organizations involved posited that integrating family planning into a resource management and community development project would facilitate male involvement by diffusing information, by referring men and women to services, and by expanding method choice to include the new Standard Days Method through networks established around issues men cared about and were already involved in. This article examines data from a community-based household survey to assess the impact of the intervention and finds significant changes in contraceptive knowledge, attitudes, and behavior from baseline to endline. Because the differences between baseline and endline are greater than the differences between participants and nonparticipants at endline, the study demonstrates the power of informal networks for spreading information.

  4. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  5. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  6. Role of magnetic resonance imaging (MRI) establishing the indication for, planning, and following up uterine artery embolization (UAE) for treating symptomatic leiomyomas of the uterus

    International Nuclear Information System (INIS)

    Kroencke, T.J.; Hamm, B.

    2003-01-01

    To describe the role of magnetic resonance imaging (MRI) in establishing the indication for, planning, and following up uterine artery embolization (UAE) for treating symptomatic leiomyomas of the uterus on the basis of the current literature and our results. Retrospective analysis of the MRI findings obtained in 130 patients before and after UAE. Presentation of characteristic MRI features and their relevance in establishing the indication for, performing, and following up of UAE. Discussion of the results in conjunction with published data. The intermediate results of UAE reported in the literature show a successful improvement of leiomyoma-related symptoms in 82-94% of cases and an average reduction of leiomyoma size by 36-64%. The typical MRI appearance of degenerating leiomyomas is presented together with that of relevant differential diagnoses. MRI findings allow for establishing the indication for UAE by providing reliable information on the location, size, and number of uterine leiomyomas. Analysis of 60 patients of our study population showed solitary leiomyoma in 16% of cases, 2-10 leiomyomas in 47%, and over 10 in 37%. Subserosal, pedunculated leiomyomas cannot be treated by UAE; these were present in 5% of the patients. MR angiography is useful in assessing pelvic vascular anatomy before the intervention and identifies collateral vascular supply to the uterus. Contrast-enhanced imaging is suitable for monitoring successful devascularization following embolization and evaluating complications. (orig.) [de

  7. Comparison of CT based-CTV plan and CT based-ICRU38 plan in brachytherapy planning of uterine cervix cancer

    International Nuclear Information System (INIS)

    Cho, Jung Keun; Han, Tae Jong

    2007-01-01

    Purpose : In spite of recent remarkable improvement of diagnostic imaging modalities such as CT, MRI, and PET and radiation therapy planing systems, ICR plan of uterine cervix cancer, based on recommendation of ICRU38(2D film-based) such as point A, is still used widely. A 3-dimensional ICR plan based on CT image provides Dose-Volume Histogram(DVH) information of the tumor and normal tissue. In this study, we compared tumor-dose, rectal-dose and bladder-dose through an analysis of DVH between CTV plan and ICRU38 plan based on CT image. Method and Material : We analyzed 11 patients with a cervix cancer who received the ICR of Ir-192 HDR. After 40Gy of external beam radiation therapy, ICR plan was established using PLATO(Nucletron) v.14.2 planning system. CT scan was done to all the patients using CT-simulator(Ultra Z, Philips). We contoured CTV, rectum and bladder on the CT image and established CTV plan which delivers the 100% dose to CTV and ICRU plan which delivers the 100% dose to the point A. Result : The volume(average±SD) of CTV, rectum and bladder in all of 11 patients is 21.8±6.6cm 3 , 60.9±25.0cm 3 , 111.6±40.1cm 3 respectively. The volume covered by 100% isodose curve is 126.7±18.9cm 3 in ICRU plan and 98.2±74.5cm 3 in CTV plan(p=0.0001), respectively. In (On) ICRU planning 22.0cm 3 of CTV volume was not covered by 100% isodose curve in one patient whose residual tumor size is greater than 4cm, while more than 100% dose was irradiated unnecessarily to the normal organ of 62.2±4.8cm 3 other than the tumor in the remaining 10 patients with a residual tumor less than 4cm in size. Bladder dose recommended by ICRU 38 was 90.1±21.3% and 68.7±26.6% in ICRU plan and in CTV plan respectively(p=0.001) while rectal dose recommended by ICRU 38 was 86.4±18.3% and 76.9±15.6% in ICRU plan and in CTV plan, respectively(p=0.08). Bladder and rectum maximum dose was 137.2±50.1%, 101.1±41.8% in ICRU plan and 107.6±47.9%, 86.9±30.8% in CTV plan, respectively

  8. PNNL Campus Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  9. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  10. British Columbia inland oil spill response plan

    International Nuclear Information System (INIS)

    2005-01-01

    This paper presents an outline of the organization, procedures and duties of the provincial government in response to inland oil spills stemming from pipeline or tank-farm rupture, train derailment and vehicle accidents in British Columbia. Provincial response strategies were reviewed, along with their relationships to various policies and standards. Public, infrastructure and environmental protection were identified as key factors. Incident notification procedures were detailed, including outlines of roles, event criteria and call for incident management teams. Agreements and cost recovery issues were examined. The characteristics of site response were reviewed, including details of communications, tactical planning, and unified command among local and federal governments. The role of First Nations and responsible parties was also addressed. Details of shore cleanup, wildlife rescue, decontamination, and waste handling strategies were presented. The organization, missions and duties for an incident management team were outlined, along with a summary of operational guidelines and information on team positions and the establishment of joint information centres. The involvement of cooperating agencies was examined. An incident command system was also presented, including details of planning, operations, logistics, and organization. A checklist of individual duties was provided, with details of responsibilities, safety issues and general instructions for all team members. tabs., figs

  11. Biosecurity Plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; Fisher, Robert N.

    2010-01-01

    extent and impacts of these and other non-native and (or) invasive species are not fully understood, they are clearly a threat to the native species and overall ecosystem integrity of Palmyra Atoll. In fact, non-native invasive species have been considered the most important threat to ecosystems in Hawai`i and the second most important threat to biodiversity world-wide. Palmyra Atoll is somewhat protected because of its remote location, but there are still potential pathways for the introduction of non-native and possibly invasive species. With the continued influx of aircraft and ocean vessels and their contents to and around Palmyra Atoll, we anticipate many more concerns related to the import and spread of non-native invasive species in the future. In terms of ecosystem security, prevention is the most effective and efficient tool for managing invasive species. There are various potential pathways for introduction and spread of non-native species within Palmyra Atoll's terrestrial and marine ecosystems. Identification of these pathways provides a first step in preventing introductions. We also recommend establishing, enhancing, and enforcing quarantine protocols to prevent future non-native species invasions. Other critical steps to minimize the impacts and spread of invasive species include early detection through inventory and monitoring, as well as containment, control, and management of non-native species already established at Palmyra Atoll. These efforts in combination with research and education will serve to inform management decisions related to ecosystem integrity. Along with reinstating ecosystem security, this Biosecurity Plan aims to evaluate new risk factors related to non-native and potentially invasive species. To that end, an adaptive management process of audit and review is highly recommended to ensure the implementation and efficacy of the management practices outlined above. In addition, it will be important to identify high r

  12. Standard format and content for emergency plans for fuel cycle and materials facilities

    International Nuclear Information System (INIS)

    1990-09-01

    This regulatory guides is being developed to provide guidance acceptable to the NRC staff on the information to be included in emergency plans and to establish a format for presenting the information. Use of a standard format will help ensure uniformity and completeness in the preparation of emergency plans. An acceptable emergency plan should describe the licensed activities conducted at the facility and the types of accidents that might occur. It should provide information on classifying postulated accidents and the licensee's procedures for notifying and coordinating with offsite authorities. The plan should provide information on emergency response measures that might be necessary, the equipment and facilities available to respond to an emergency, and how the licensee will maintain emergency preparedness capability. It should describe the records and reports that will be maintained. There should also be a section on recovery after an accident and plans for restoring the facility to a safe condition. 4 refs

  13. Renewable energy plan of action for American Samoa

    Energy Technology Data Exchange (ETDEWEB)

    Shupe, J.W. (USDOE San Francisco Operations Office, Honolulu, HI (USA). Pacific Site Office); Stevens, J.W. (Sandia National Labs., Albuquerque, NM (USA))

    1990-11-01

    American Samoa has no indigenous fossil fuels and is almost totally dependent for energy on seaborne petroleum. However, the seven Pacific Islands located at 14 degrees south latitude that constitute American Samoa have a wide variety of renewable resources with the potential for substituting for imported oil. Included as possible renewable energy conversion technologies are solar thermal, photovoltaics, wind, geothermal, ocean thermal, and waste-to-energy recovery. This report evaluates the potential of each of these renewable energy alternatives and establishes recommended priorities for their development in American Samoa. Rough cost estimates are also included. Although renewable energy planning is highly site specific, information in this report should find some general application to other tropical insular areas.

  14. China National Scenic Area and Its Planning Characteristics

    Institute of Scientific and Technical Information of China (English)

    Jia; Jianzhong; Deng; Wugong; Li; Caige

    2016-01-01

    Thirty years since the foundation of China’s scenic area system, a comparatively comprehensive structural system, legal system, and management system have been established in this field, which has protected precious landscape resources and made remarkable achievements. The planning of scenic areas has its own attributes and technical characteristics, which attaches great importance to establishing a functional structure that combines the three systems of sightseeing, tourism services, and social management of local residents. Moreover, with the development of scenic areas, the planning will lay more emphasis on the connection between different levels, give full play to the comprehensive function of scenic areas, pay attention to the research on village and town planning within the area, and learn from the experience of national parks in foreign countries.

  15. China National Scenic Area and Its Planning Characteristics

    Institute of Scientific and Technical Information of China (English)

    Jia Jianzhong; Deng Wugong; Li Caige

    2016-01-01

    Thirty years since the foundation of China's scenic area system,a comparatively comprehensive structural system,legal system,and management system have been established in this field,which has protected precious landscape resources and made remarkable achievements.The planning of scenic areas has its own attributes and technical characteristics,which attaches great importance to establishing a functional structure that combines the three systems of sightseeing,tourism services,and social management of local residents.Moreover,with the development of scenic areas,the planning will lay more emphasis on the connection between different levels,give full play to the comprehensive function of scenic areas,pay attention to the research on village and town planning within the area,and learn from the experience of national parks in foreign countries.

  16. Emergency response plan for accidents in Saudi Arabia

    International Nuclear Information System (INIS)

    Al-Solaiman, K.M.; Al-Arfaj, A.M.; Farouk, M.A.

    2000-01-01

    This paper presents a brief description of the general emergency plan for accidents involving radioactive materials in the Kingdom of Saudi Arabia. Uses of radioactive materials and radiation sources and their associated potential accident are specified. Most general accident scenarios of various levels have been determined. Protective measures have been specified to reduce individual and collective doses arising during accident situations. Intervention levels for temporary exposure situations, as established in the IAEA's basic safety standards for protection against ionising radiation and for the safety of radiation sources, are adopted as national intervention levels. General procedures for implementation of the response plan, including notification and radiological monitoring instrumentation and equipment, are described and radiation monitoring teams are nominated. Training programs for the different parties which may be called upon to respond are studied and will be started. (author)

  17. Oil spill response planning on the Columbia river estuary

    International Nuclear Information System (INIS)

    Christopherson, S.K.; Slyman, P.M.

    1993-01-01

    The Columbia River Estuary lies along the Washington-Oregon state boundary on the west coast of the United States. The entire area is environmentally very sensitive with numerous large, shallow bays, exposed mud flats, wetland areas, and central channels having maximum currents of three to four knots. These features make the area very difficult to protect from an oil spill. Spill response is further complicated because of the many different state, federal, and local jurisdictions with mandated responsibilities in oil spill response and environmental protection. Under the leadership of the US Coast Guard Marine Safety Office in Portland, Oregon, a steering group was established to guide the development of a response plan for the Columbia River Estuary. A concerted effort was made to include representatives from response organizations, natural resource agencies, and resource users from federal, state, and local governments, and commercial sectors in the planning process. The first draft of an operational response plan was completed the summer of 1992 through a combination of technical workshops, field trips, and small working groups meeting with local communities. The Columbia River Estuary Response Plan prioritizes areas to protect; identifies specific response strategies for protecting these areas; and outlines the Iogistics needed to implement these strategies, including equipment needs, the location of staging areas, and the identification of pre-designed command posts. The local spill response cooperative and oil transportation industry are using the plan to coordinate the purchase of response equipment and the staging of this equipment at numerous locations along the river. The key to success is ensuring that all the groups responding to an event participate in the planning process together. This process has worked well and will serve as a model for response planning for other areas along the Columbia River and coastal areas of Washington and Oregon

  18. Developing a business plan for a company in Finland owned by foreigners. Case: Prime Sails Ltd

    OpenAIRE

    Honkonen-Kulagina, Alina Linda

    2012-01-01

    To establish a new company is challenging for any businessman or businesswomen. Starting up a company in a foreign country is twice is hard. The purpose of the thesis is to examine the factors that affect the success of a company newly-established by immigrants. These include such areas as good business plan, market research, cultural knowledge and awareness of the legislative environment. The case study focuses on the company Prime Sails Ltd, which is a supplier of sails. The main ob...

  19. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  20. Summary report of a workshop on establishing cumulative effects thresholds : a suggested approach for establishing cumulative effects thresholds in a Yukon context

    International Nuclear Information System (INIS)

    2003-01-01

    Increasingly, thresholds are being used as a land and cumulative effects assessment and management tool. To assist in the management of wildlife species such as woodland caribou, the Department of Indian and Northern Affairs (DIAND) Environment Directorate, Yukon sponsored a workshop to develop and use cumulative thresholds in the Yukon. The approximately 30 participants reviewed recent initiatives in the Yukon and other jurisdictions. The workshop is expected to help formulate a strategic vision for implementing cumulative effects thresholds in the Yukon. The key to success resides in building relationships with Umbrella Final Agreement (UFA) Boards, the Development Assessment Process (DAP), and the Yukon Environmental and Socio-Economic Assessment Act (YESAA). Broad support is required within an integrated resource management framework. The workshop featured discussions on current science and theory of cumulative effects thresholds. Potential data and implementation issues were also discussed. It was concluded that thresholds are useful and scientifically defensible. The threshold research results obtained in Alberta, British Columbia and the Northwest Territories are applicable to the Yukon. One of the best tools for establishing and tracking thresholds is habitat effectiveness. Effects must be monitored and tracked. Biologists must share their information with decision makers. Interagency coordination and assistance should be facilitated through the establishment of working groups. Regional land use plans should include thresholds. 7 refs.

  1. 76 FR 35894 - Office of Federal High-Performance Green Buildings; Establishment of the Green Building Advisory...

    Science.gov (United States)

    2011-06-20

    ... Federal High-Performance Green Buildings; Establishment of the Green Building Advisory Committee AGENCY... announces the establishment of the Green Building Advisory Committee (the Committee), pursuant to Section... strategic plans, products and activities of the Office of Federal High-Performance Green Buildings and...

  2. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  3. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  4. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  5. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  6. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  7. ASME nuclear codes and standards risk management strategic planning

    International Nuclear Information System (INIS)

    Hill, Ralph S. III; Balkey, Kenneth R.; Erler, Bryan A.; Wesley Rowley, C.

    2007-01-01

    This paper is prepared in honor and in memory of the late Professor Emeritus Yasuhide Asada to recognize his contributions to ASME Nuclear Codes and Standards initiatives, particularly those related to risk-informed technology and System Based Code developments. For nearly two decades, numerous risk-informed initiatives have been completed or are under development within the ASME Nuclear Codes and Standards organization. In order to properly manage the numerous initiatives currently underway or planned for the future, the ASME Board on Nuclear Codes and Standards (BNCS) has an established Risk Management Strategic Plan (Plan) that is maintained and updated by the ASME BNCS Risk Management Task Group. This paper presents the latest approved version of the plan beginning with a background of applications completed to date, including the recent probabilistic risk assessment (PRA) standards developments for nuclear power plant applications. The paper discusses planned applications within ASME Nuclear Codes and Standards that will require expansion of the ASME PRA Standard to support new advanced light water reactor and next generation reactor developments, such as for high temperature gas-cooled reactors. Emerging regulatory developments related to risk-informed, performance- based approaches are summarized. A long-term vision for the potential development and evolution to a nuclear systems code that adopts a risk-informed approach across a facility life-cycle (design, construction, operation, maintenance, and closure) is also summarized. Finally, near term and long term actions are defined across the ASME Nuclear Codes and Standards organizations related to risk management, including related U.S. regulatory activities. (author)

  8. National Sustainable Transport Planning – What is it and what should it be?

    DEFF Research Database (Denmark)

    Sørensen, Claus Hedegaard; Gudmundsson, Henrik; Leleur, Steen

    transport raises important questions concerning the organization of national, planning processes integrating sustainability. In Denmark the effectiveness of the previous ‘ad hoc’ approach has been questioned, and some planning innovations have been adopted, like longer time frames, fixed planning cadences...... and coherent, strategic analyses. Internationally, transdisciplinary research on national, sustainable transport planning is limited and it is not established as a coherent field of research. The ambition of this paper is to contribute to this new field of research by establishing understandings...... and definitions of national sustainable transport planning. This will be done by distinguishing between existing national transport planning frameworks; those frameworks that attempt to incorporate sustainability; and a more elaborate and or ideal concept of national sustainable transport planning. Selected...

  9. THE METHOD OF MULTIPLE SPATIAL PLANNING BASIC MAP

    OpenAIRE

    Zhang, C.; Fang, C.

    2018-01-01

    The “Provincial Space Plan Pilot Program” issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the p...

  10. [Evaluation of Cellular Effects Caused by Lunar Regolith Simulant Including Fine Particles].

    Science.gov (United States)

    Horie, Masanori; Miki, Takeo; Honma, Yoshiyuki; Aoki, Shigeru; Morimoto, Yasuo

    2015-06-01

    The National Aeronautics and Space Administration has announced a plan to establish a manned colony on the surface of the moon, and our country, Japan, has declared its participation. The surface of the moon is covered with soil called lunar regolith, which includes fine particles. It is possible that humans will inhale lunar regolith if it is brought into the spaceship. Therefore, an evaluation of the pulmonary effects caused by lunar regolith is important for exploration of the moon. In the present study, we examine the cellular effects of lunar regolith simulant, whose components are similar to those of lunar regolith. We focused on the chemical component and particle size in particular. The regolith simulant was fractionated to lunar regolith simulant such as cell membrane damage, induction of oxidative stress and proinflammatory effect.

  11. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan. Revision 1

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-03-01

    This plan contains the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program. The plan outlines the activities and schedules developed by the ERC to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. This plan satisfies US Department of Energy (DOE) requirements including the Pollution Prevention Awareness program required by DOE Order 5400.1 (DOE 1988). This plan is consistent with Executive Order 12856 and Secretary O'Leary's pollution prevention Policy Statement of December 27, 1994, which set US and DOE pollution prevention policies, respectively. It is also consistent with the DOE Pollution Prevention Crosscut Plan, 1994, which provides guidance in meeting the DOE goals in pollution prevention. The purpose of this plan is to aid ERC projects in meeting and documenting compliance with requirements for WMin/P2. This plan contains the objectives, strategy, and support activities of the ERC Team WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Wherever appropriate, the ERC will integrate the pollution prevention activities in this plan into regular program activities rather than establishing separate WMin/P2 activities. Moreover, wherever possible, existing documents, procedures, and activities will be used to meet WMin/P2 requirements

  12. THE EXPERIENCE OF FORMATION OF ESTABLISHMENTS OF OUT - SCHOOL EDUCATION IN UKRAINE

    Directory of Open Access Journals (Sweden)

    KOVALSKA G. L.

    2015-10-01

    Full Text Available Problem statement. Modern socio-economic conditions set new educational challenges in Ukraine influencing on the town planning aspects of development the network of different types of educational establishments, their location in building, architectural solutions. Ukrainian national model of out-school education is unique and reflects social and national specification of pedagogical development. All integrated innovations should be thoroughly comprehended and analyzed. During the years of development an extensive network of out-school education in the cities of Ukraine has been developed. There is a marked shortage of out-school educational establishments. Youth palaces of old type are not working at present. School clubs are not numerous and depressive with tendency to be totally eliminated. Unfortunately, existing normative base is still insufficient for complete extracurricular establishment network creation. Article’s purpose. To analyze problems, concerning out-school educational network formation and to provide suggestions regarding the calculation of the area of land plot. Conclusions. A number of issues stipulated by lack of appropriate scientific and conceptual works and regulatory parameters while improving of the network of out-school educational establishments arises. The problem areas in the regulatory framework are pointed out and possible solution has been proposed. The earlier a work program, authorized by the general out-school educational development will be formulated, the sooner the network of out-school establishments and improvement of quality of architectural and town planning solutions will be appeared.

  13. Unvented Drum Handling Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    2000-01-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  14. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  15. Hanford Site Transuranic (TRU) Waste Certification Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of US. Department of Energy (DOE) 0 435.1, ''Radioactive Waste Management,'' and the Contact-Handled (CH) Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC). WIPP-WAC requirements are derived from the WIPP Technical Safety Requirements, WIPP Safety Analysis Report, TRUPACT-II SARP, WIPP Land Withdrawal Act, WIPP Hazardous Waste Facility Permit, and Title 40 Code of Federal Regulations (CFR) 191/194 Compliance Certification Decision. The WIPP-WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WPP-WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their program for managing TRU waste and TRU waste shipments before transferring waste to WIPP. Waste characterization activities provide much of the data upon which certification decisions are based. Waste characterization requirements for TRU waste and TRU mixed waste that contains constituents regulated under the Resource Conservation and Recovery Act (RCRA) are established in the WIPP Hazardous Waste Facility Permit Waste Analysis Plan (WAP). The Hanford Site Quality Assurance Project Plan (QAPjP) (HNF-2599) implements the applicable requirements in the WAP and includes the qualitative and quantitative criteria for making hazardous waste determinations. The Hanford Site must also ensure that its TRU waste destined for disposal at WPP meets requirements for transport in the Transuranic Package Transporter-11 (TRUPACT-11). The US. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-11 requirements in the Safety Analysis Report for the TRUPACT-II Shipping Package (TRUPACT-11 SARP). In

  16. Social Media Marketing Plan for a SME

    OpenAIRE

    Järvensivu, Veera

    2017-01-01

    The aim of this bachelor’s thesis was to create an efficient, low-cost social media marketing plan for a small clothing company called Nikitrade. The data gathered for establishing the marketing plan were mainly secondary data consisting of multiple books and articles related to the topic. For qualitative data gathering, interviews and discussions with the company owners were used. Because of the competitive sensitiveness of the subject, the social marketing plan itself is not published. ...

  17. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  18. The Emergency Action Plan of the Spanish Nuclear Safety Council (CSN)

    International Nuclear Information System (INIS)

    Calvin Cuarteto, M.; Camarma, J. R.; Martin Calvarro, J. M

    2007-01-01

    The Spanish Nuclear safety Council (CSN) has assigned by law among others the function to coordinate the measures of support and answer to nuclear emergency situations for all the aspects related with nuclear safety and radiological protection. Integrating and coordinating the different organisations public and private companies whose aid is necessary for the fulfilment of the functions attributed to the Regulatory Body. In order to suitable perform this function, CSN has equipped itself with an Emergency Action Plan that structures the response organization, establishes responsibility levels, incorporates basic performance procedures and includes capabilities to face the nuclear and radiological emergencies considering the external supports, resulting from the collaboration agreements with public institutions and private companies. To accomplish the above mentioned Emergency Action Plan, CSN has established and implanted a formation and training and re-training program for the organization response for emergencies and has update an operative centre (Emergency Room called Salem), equipped with infrastructures, tools and communication and operative systems that incorporate the more advanced technologies available to date. (Author)

  19. State of emergency preparedness for US health insurance plans.

    Science.gov (United States)

    Merchant, Raina M; Finne, Kristen; Lardy, Barbara; Veselovskiy, German; Korba, Caey; Margolis, Gregg S; Lurie, Nicole

    2015-01-01

    Health insurance plans serve a critical role in public health emergencies, yet little has been published about their collective emergency preparedness practices and policies. We evaluated, on a national scale, the state of health insurance plans' emergency preparedness and policies. A survey of health insurance plans. We queried members of America's Health Insurance Plans, the national trade association representing the health insurance industry, about issues related to emergency preparedness issues: infrastructure, adaptability, connectedness, and best practices. Of 137 health insurance plans queried, 63% responded, representing 190.6 million members and 81% of US plan enrollment. All respondents had emergency plans for business continuity, and most (85%) had infrastructure for emergency teams. Some health plans also have established benchmarks for preparedness (eg, response time). Regarding adaptability, 85% had protocols to extend claim filing time and 71% could temporarily suspend prior medical authorization rules. Regarding connectedness, many plans shared their contingency plans with health officials, but often cited challenges in identifying regulatory agency contacts. Some health insurance plans had specific policies for assisting individuals dependent on durable medical equipment or home healthcare. Many plans (60%) expressed interest in sharing best practices. Health insurance plans are prioritizing emergency preparedness. We identified 6 policy modifications that health insurance plans could undertake to potentially improve healthcare system preparedness: establishing metrics and benchmarks for emergency preparedness; identifying disaster-specific policy modifications, enhancing stakeholder connectedness, considering digital strategies to enhance communication, improving support and access for special-needs individuals, and developing regular forums for knowledge exchange about emergency preparedness.

  20. Research on English course based on career planning

    Directory of Open Access Journals (Sweden)

    Ying Shi

    2017-02-01

    Full Text Available For the current higher vocational English education way, this paper researches English course on the basis of the need of English competence in career planning, and determines four main objectives to be accomplished in English teaching through the research of the need of English in career planning, and establishes the principle of course design. This paper proposes four kinds of teaching mode according to the career development and career demands, and establishes the hierarchical analysis structure on the basis of the teaching objectives as criteria, analyzes the weight of four objectives, and gives out the quantifiable results for matching with the teaching programs. The results show that, the way of theory and practice education is the most effective, and the academic language competence in career planning is the most important demand. The optimization ratio of English course teaching way based on career planning is 0.26: 0.29: 0.22: 0.23.

  1. Blood donor: nursing care plan

    OpenAIRE

    Marco Antonio Zapata Sampedro; Laura Castro Varela

    2008-01-01

    The standardized nursing care plan can be used as a means through which the nurse will assess and identify the particular needs of the blood donor.To draw up the care plan, we have conducted the evaluation on the basis of the Marjory Gordon’s functional health patterns.The more prevailing diagnosis according to the NANDA taxonomy have been identified, results have been established according to the NOC (Nursing Outcomes Classification) taxonomy, and nursing interventions have been suggested ac...

  2. The law for the establishment of Science and Technology Agency

    International Nuclear Information System (INIS)

    1979-01-01

    The law defines the scope and competence of business under the jurisdiction of the agency to establish the organization possible to carry out effectively the administrative work in charge. The agency is set up as an outside department of the Prime Minister's Office under the provisions of the law for the organization of state administration. Main tasks of the agency shall be to execute the administration of science and technology as a whole to develop them and help the progress of the national economy. Competences of the agency are provided for, such as: to make appropriations necessary for the business in charge in the extent of the budget; to collect incomes and pay expenses necessary for the business; to establish and control offices and other facilities directly necessary for the business; to appoint and remove the staff, etc. The agency is consisted of the secretariat and five bureaus of planning, research coordination, promotion, atomic energy and atomic energy safety. The functions of each department are prescribed in detail respectively. A science counselor is appointed, who assists the Director General in deciding important policies. The agency has its annexed organizations, including national aerospace laboratory, national research institutes for metals and radiological science, national research center for disaster prevention and others. (Okada, K.)

  3. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1994-11-01

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  4. Theory of Planned Behavior including self-stigma and perceived barriers explain help-seeking behavior for sexual problems in Iranian women suffering from epilepsy.

    Science.gov (United States)

    Lin, Chung-Ying; Oveisi, Sonia; Burri, Andrea; Pakpour, Amir H

    2017-03-01

    To apply the Theory of Planned Behavior (TPB) and the two additional concepts self-stigma and perceived barriers to the help-seeking behavior for sexual problems in women with epilepsy. In this 18-month follow-up study, TPB elements, including attitude, subjective norm, perceived behavioral control, and behavioral intention along with self-stigma and perceived barriers in seeking help for sexual problems were assessed in n=818 women with epilepsy (94.0% aged ≤40years). The basic TPB model (model 1) and the TPB model additionally including self-stigma and perceived barriers (Model 2) were analyzed using structural equation modeling (SEM). Both SEM models showed satisfactory model fits. According to model, attitude, subjective norms, perceived behavioral control, and intention explained 63.1% of the variance in help-seeking behavior. Variance was slightly higher (64.5%) when including self-stigma and perceived barriers (model 2). In addition, the fit indices of the models were better highlighting the importance of self-stigma and perceived barriers in help-seeking behavior for sexual problems. Theory of Planned Behavior is useful in explaining help-seeking behavior for sexual problems in women with epilepsy. Self-stigma and perceived barriers are additional factors that should be considered in future interventions aiming to adopt TPB to improve help-seeking behavior for sexual problems. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  6. Bringing Value-Based Perspectives to Care: Including Patient and Family Members in Decision-Making Processes.

    Science.gov (United States)

    Kohler, Graeme; Sampalli, Tara; Ryer, Ashley; Porter, Judy; Wood, Les; Bedford, Lisa; Higgins-Bowser, Irene; Edwards, Lynn; Christian, Erin; Dunn, Susan; Gibson, Rick; Ryan Carson, Shannon; Vallis, Michael; Zed, Joanna; Tugwell, Barna; Van Zoost, Colin; Canfield, Carolyn; Rivoire, Eleanor

    2017-03-06

    Recent evidence shows that patient engagement is an important strategy in achieving a high performing healthcare system. While there is considerable evidence of implementation initiatives in direct care context, there is limited investigation of implementation initiatives in decision-making context as it relates to program planning, service delivery and developing policies. Research has also shown a gap in consistent application of system-level strategies that can effectively translate organizational policies around patient and family engagement into practice. The broad objective of this initiative was to develop a system-level implementation strategy to include patient and family advisors (PFAs) at decision-making points in primary healthcare (PHC) based on wellestablished evidence and literature. In this opportunity sponsored by the Canadian Foundation for Healthcare Improvement (CFHI) a co-design methodology, also well-established was applied in identifying and developing a suitable implementation strategy to engage PFAs as members of quality teams in PHC. Diabetes management centres (DMCs) was selected as the pilot site to develop the strategy. Key steps in the process included review of evidence, review of the current state in PHC through engagement of key stakeholders and a co-design approach. The project team included a diverse representation of members from the PHC system including patient advisors, DMC team members, system leads, providers, Public Engagement team members and CFHI improvement coaches. Key outcomes of this 18-month long initiative included development of a working definition of patient and family engagement, development of a Patient and Family Engagement Resource Guide and evaluation of the resource guide. This novel initiative provided us an opportunity to develop a supportive system-wide implementation plan and a strategy to include PFAs in decision-making processes in PHC. The well-established co-design methodology further allowed us to

  7. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  8. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  9. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  10. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    Science.gov (United States)

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  11. Pollution prevention program plan 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE's commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE's routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations

  12. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  13. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  14. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  15. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  16. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  17. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  18. Translating Research into Practice: Establishing a Network of Climate Change Practitioners in Ontario, Canada

    Science.gov (United States)

    Milner, G. A.

    2017-12-01

    Climate research and information continues to emerge at a rapid pace from the academic and scientific community. Decisions being made today by planners, engineers and staff across the Province of Ontario rely on science and information to plan and build our systems for the long term. Of course, as scientific information evolves continuously to produce lessons learned and new evidence, on the ground decisions often become entrenched in outdated information and need updating. Given this, bridging the gap between research to policy, and research to practice is of critical importance as the Province of Ontario upgrades its infrastructure, plans for long term growth in population within the Great Lakes Basin, and manages its natural systems and resources responsibly. The Ontario Climate Consortium (OCC) is an interdisciplinary network of academics and practitioners established in 2011 in the province that works to mobilize climate research findings towards building capacity, inspiring climate action, and training end-users with the latest science. The OCC has collaborated with more than 39 organizations throughout Ontario and across Canada, including government agencies at all levels (local, provincial and federal), non-profit organizations and private sector companies. This presentation will describe the foundations of climate action in Ontario, Canada including the landscape of climate adaptation practitioners from both public and private organizations. Furthermore, this presentation will feature lessons learned from the OCC network, including: 1) What comprises effective partnerships to undertake climate change adaptation planning for cities; 2) How to build the foundation for capacity at agencies with limited resources or expertise in the climate change field; and 3) How to successfully mobilize complex climate data for end-users to produce usable tools (through a case study research project). The latter will present findings from a two-year research project

  19. Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    Carr, Adrianne E. [Argonne National Lab. (ANL), Argonne, IL (United States); Wuthrich, Kelsey K. [Argonne National Lab. (ANL), Argonne, IL (United States); Ziech, Angela M. [Argonne National Lab. (ANL), Argonne, IL (United States); Bowen, Esther E. [Argonne National Lab. (ANL), Argonne, IL (United States); Quinn, John [Argonne National Lab. (ANL), Argonne, IL (United States)

    2013-03-01

    This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use or with monitoring data.

  20. A plan for research by the atmospheric research section in support of Ontario Hydro's nuclear activities

    International Nuclear Information System (INIS)

    Ogram, G.L.; Melo, O.T.

    1984-01-01

    A plan for nuclear studies by the Atmospheric Research Section is presented. The need for research is discussed and research objectives are established. Recommended research activities include the study of fundamental processes governing the fate of emissions released to the atmosphere by Hydro's nuclear facilities and the development of improved transport models describing the fate of these emissions. A Sectional goal of providing technical expertise in the atmospheric sciences in support of Ontario Hydro's present and future nuclear activities is proposed. The plan covers a five-year time frame (1984-1988)

  1. The Philippine Population Program strategic plan (1981-1985).

    Science.gov (United States)

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.

  2. Engineering Sciences Strategic Leadership Plan

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Heidi A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-02-14

    The purpose of this report is to promote the three key elements of engineering capabilities, staff and engagement in coordination with an R&D investment cycle; and establish an Engineering Steering Council to own and guide this leadership plan.

  3. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  4. Changes in Endogenous Cytokinins During Germination and Seedling Establishment of Tagetes minuta L.

    Czech Academy of Sciences Publication Activity Database

    Stirk, W.A.; Gold, J.D.; Novák, Ondřej; Strnad, Miroslav; van Staden, J.

    2005-01-01

    Roč. 47, č. 1 (2005), s. 1-7 ISSN 0167-6903 Institutional research plan: CEZ:AV0Z50380511 Keywords : Cytokinins * Germination * Seedling establishment Subject RIV: EF - Botanics Impact factor: 0.841, year: 2005

  5. MINERVA: A multi-modality plug-in-based radiation therapy treatment planning system

    International Nuclear Information System (INIS)

    Wemple, C. A.; Wessol, D. E.; Nigg, D. W.; Cogliati, J. J.; Milvich, M.; Fredrickson, C. M.; Perkins, M.; Harkin, G. J.; Hartmann-Siantar, C. L.; Lehmann, J.; Flickinger, T.; Pletcher, D.; Yuan, A.; DeNardo, G. L.

    2005-01-01

    Researchers at the INEEL, MSU, LLNL and UCD have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system, which can be used for planning and analysing several radiotherapy modalities, either singly or combined, using common treatment planning tools. It employs an integrated, lightweight plug-in architecture to accommodate multi-modal treatment planning using standard interface components. The design also facilitates the future integration of improved planning technologies. The code is being developed with the Java programming language for inter-operability. The MINERVA design includes the image processing, model definition and data analysis modules with a central module to coordinate communication and data transfer. Dose calculation is performed by source and transport plug-in modules, which communicate either directly through the database or through MINERVA's openly published, extensible markup language (XML)-based application programmer's interface (API). All internal data are managed by a database management system and can be exported to other applications or new installations through the API data formats. A full computation path has been established for molecular-targeted radiotherapy treatment planning, with additional treatment modalities presently under development. (authors)

  6. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  7. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  8. Framework for establishing records control in hospitals as an ISO 9001 requirement.

    Science.gov (United States)

    Al-Qatawneh, Lina

    2017-02-13

    Purpose The purpose of this paper is to present the process followed to control records in a Jordanian private community hospital as an ISO 9001:2008 standard requirement. Design/methodology/approach Under the hospital quality council's supervision, the quality management and development office staff were responsible for designing, planning and implementing the quality management system (QMS) using the ISO 9001:2008 standard. A policy for records control was established. An action plan for establishing the records control was developed and implemented. On completion, a coding system for records was specified to be used by hospital staff. Finally, an internal audit was performed to verify conformity to the ISO 9001:2008 standard requirements. Findings Successful certification by a neutral body ascertained that the hospital's QMS conformed to the ISO 9001:2008 requirements. A framework was developed that describes the records controlling process, which can be used by staff in any healthcare organization wanting to achieve ISO 9001:2008 accreditation. Originality/value Given the increased interest among healthcare organizations to achieve the ISO 9001 certification, the proposed framework for establishing records control is developed and is expected to be a valuable management tool to improve and sustain healthcare quality.

  9. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  10. Operating Plan and Guidelines (2011 - 2016)

    International Nuclear Information System (INIS)

    2011-01-01

    The Committee on Nuclear Regulatory Activities (CNRA) of the OECD Nuclear Energy Agency (NEA) is an international committee made up primarily of senior nuclear regulators. It was established in 1989 as a forum for the exchange of information and experience among regulatory organisations and for the review of developments which could affect regulatory requirements. The Committee is responsible for the programme of the NEA, concerning the regulation, licensing and inspection of nuclear installations. In particular, the Committee reviews current practices and operating experience. The Joint CSNI/CNRA Strategic Plan states that: The Operating Plan for each committee aligns with the Joint CNRA/ CSNI Strategic Plan. The Committee's Operating Plans describes each Committee's organisation, priorities, and operating procedures to be used in fulfilling their mandates in accordance with this strategic plan. Specific attention will be given to ensure that cross-cutting issues are satisfactorily dealt with. This report represents such an operating plan. The intention is that it should fit onto a new third rung on the ladder representing the hierarchy of documents that govern the work of CNRA. At the top of this hierarchy is the Strategic Plan of the NEA; immediately below that is the Joint CSNI/CNRA Strategic Plan; followed by the new operating plan and the guidelines for methods of work. This plan sets the basis for establishing the current CNRA Programme of Work. Since the issuance of the last plan in 2007 there has been a significant shift and many member countries are now constructing new facilities or in the process of legislative or technical processing for new licenses. This comes along in an atmosphere in which current operating plants requesting power up-rates, extended licenses, and substantial activity in new licensing and new construction. It is clear that all these activities require similar attention from the regulators and operators, and the responsibilities

  11. Comparative Study on Urban Planning Inspection System in the UK and China

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    The urban-rural planning inspector system of China is hierarchical supervision over local governments from the Central Government in respect of town and country development. The comparative analysis on planning inspection system of the UK may provide experience in seeking solutions to the problems occurring in the system of China. The planning inspector system of China can be improved in six aspects such as establishing the legal status, setting up the planning inspection agency, completing the personnel management system, enhancing the legal binding force, building the internal and external supervision channel, supplementing the relieve function, and establishing the coordination mechanism of various internal supervisions.

  12. 78 FR 51664 - Vessel Traffic Service Updates, Including Establishment of Vessel Traffic Service Requirements...

    Science.gov (United States)

    2013-08-21

    ... expands it to include Lake Charles, LA; consolidates and expands a VTS Special Area in Puget Sound, WA... requirements. The changes made by this rule will align regulations with the current operating procedures of the... compliance system and also expands the VTS Port Arthur area to include Lake Charles, LA. The Coast Guard...

  13. EG and G Idaho environmental protection implementation plan

    International Nuclear Information System (INIS)

    Stump, R.C.

    1989-11-01

    This report describes the EG ampersand G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.0 Additionally, this report is intended to supplement the Department of Energy -- Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 3 figs., 1 tab

  14. A study on the establishment of a nuclear regulators' association in the Northeast Asia

    International Nuclear Information System (INIS)

    Shin, Won Ky; Park, Y. S.; Lee, H. J.; Park, D. K.; Choi, K. S.; Park, C. H.; Hwang, S. C.; Do, K. S.; Choi, Y. S.

    2001-12-01

    It is desirable to make joint efforts among northeast countries in order to assure nuclear safety in northeast Asia where nuclear power development has been active. In this regard, through this study, it is developed the draft for the establishment of a regional cooperative mechanism in the field of nuclear safety regulation in this region. This will be utilized as a basic references to plan and conduct regional cooperation in the field of nuclear safety regulation in this region. Through this study, the status of multilateral cooperative mechanisms in nuclear safety field, domestic and international nuclear safety trends, and nuclear safety cooperation status in this region are investigated. Based on this investigation, the draft for the establishment of the Nuclear Regulators Meeting in the Northeast Asia (NUREMA) and its implementation plan are developed. If the NUREMA is successfully established and operated, it will serve as a central basis for exchanging regulatory related information, experience, and techniques, etc., which will strengthen domestic and regional nuclear safety. It is desirable to strengthen the MOST∼NNSA∼METI Tripartite Meeting on a step by step basis for the next few years (4 - 5 years) and finally establish a multilateral cooperative mechanism like NUREMA

  15. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  16. Nonisothermal hydrologic transport experimental plan

    International Nuclear Information System (INIS)

    Rasmussen, T.C.; Evans, D.D.

    1992-09-01

    A field heater experimental plan is presented for investigating hydrologic transport processes in unsaturated fractured rock related to the disposal of high-level radioactive waste (HLW) in an underground repository. The experimental plan provides a methodology for obtaining data required for evaluating conceptual and computer models related to HLW isolation in an environment where significant heat energy is produced. Coupled-process models are currently limited by the lack of validation data appropriate for field scales that incorporate relevant transport processes. Presented in this document is a discussion of previous nonisothermal experiments. Processes expected to dominate heat-driven liquid, vapor, gas, and solute flow during the experiment are explained, and the conceptual model for nonisothermal flow and transport in unsaturated, fractured rock is described. Of particular concern is the ability to confirm the hypothesized conceptual model specifically, the establishment of higher water saturation zones within the host rock around the heat source, and the establishment of countercurrent flow conditions within the host rock near the heat source. Field experimental plans are presented using the Apache Leap Tuff Site to illustrate the implementation of the proposed methodology. Both small-scale preliminary experiments and a long-term experiment are described

  17. SEDAC information gateway plan V(1)

    Science.gov (United States)

    Chen, Robert S. (Compiler)

    1995-01-01

    This annual update of the Information Gateway Plan incorporates changes recommended by the Socioeconomic Data and Applications Center (SEDAC) User Working Group (UWG) and reflects comments and suggestions from users, collaborators, and the Contracting Officer Technical Representative (COTR). The Information Gateway Plan is a concise and specific plan that outlines SEDAC activities and services in support of the earth and social sciences and other user communities. The SEDAC Information Gateway effort is a primary means by which the Earth Observing System Data and Information System (EOSDIS) can link meaningfully with a broad range of social science data sources and users in ways that lead to tangible benefits to the American people. The SEDAC Information Gateway provides interdisciplinary access to socioeconomic and physical science data and information resources held by SEDAC and numerous other institutions and networks around the world. The Plan describes the areas of research of earth scientists and socioeconomic scientists where interchange of data and information is most needed. It sets guidelines for the continued development of SEDAC's directory of social science datasets and establishes priorities for efforts to make data held by SEDAC or accessible through SEDAC available to the user community. The Plan also describes the means by which the SEDAC user community can access information products specified by the SEDAC Data and Applications Development Plan (DADP). Among other major activities, SEDAC will continue to enhance and operate a directory capability, interoperable with the Global Change Master Directory, that provides the socioeconomic community with information about earth science products and the earth science research community with information about socioeconomic data. The Information Gateway also serves as a unique and powerful access pathway for a wide range of users and potential users of socioeconomic and earth science data, including

  18. Westinghouse Hanford Company waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Craig, P.A.; Nichols, D.H.; Lindsey, D.W.

    1991-08-01

    The purpose of this plan is to establish the Westinghouse Hanford Company's Waste Minimization Program. The plan specifies activities and methods that will be employed to reduce the quantity and toxicity of waste generated at Westinghouse Hanford Company (Westinghouse Hanford). It is designed to satisfy the US Department of Energy (DOE) and other legal requirements that are discussed in Subsection C of the section. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as permitted by DOE Order 5400.1 (DOE 1988a). This plan is based on the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, which directs DOE Field Office, Richland contractors to develop and maintain a waste minimization program. This waste minimization program is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Westinghouse Hanford Waste Minimization Program is designed to prevent or minimize pollutant releases to all environmental media from all aspects of Westinghouse Hanford operations and offers increased protection of public health and the environment. 14 refs., 2 figs., 1 tab

  19. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  20. Freedom of Information Act (FOIA) Plan

    Data.gov (United States)

    Office of Personnel Management — Executive Order (E.O.) 13,392 mandates that each federal agency shall have a Freedom of Information Act (FOIA) working plan with established goals and time frames to...

  1. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    1999-01-01

    Full text: In 1998 ZdAJ was mainly involved in the production of accelerators, simulators and tables ordered by the domestic market or destined for export. ZDAJ produced 28 POLKAM 15 therapeutic tables, 7 SIMAX X-ray simulators, 2 Coline soft accelerators and 2 Neptun accelerators. In addition 2D ALFARD treatment planning system was introduced for sale and five planning systems were installed in Polish hospitals. An order was received for the delivery of target chambers for the Isolde experiment carried out by CERN European Laboratory in Geneva. It is noteworthy that we got 1998 ''Teraz Polska'' prize, a reward for the best industrial product of the year based on Polish technical solutions, for the SACON cancer treatment therapeutic range. The SACON therapeutic range includes SMIAX diagnostic simulator with POLKAM 15 table, ALFARD treatment planning system, as well as Coline and Neptun accelerators. (author)

  2. Pre-operative planning for mandibular reconstruction - A full digital planning workflow resulting in a patient specific reconstruction

    Science.gov (United States)

    2011-01-01

    Objectives Reconstruction of large mandiblular defects following ablative oncologic surgery could be done by using vascularized bone transfer or, more often, primarily with simultaneous or delayed bone grafting, using load bearing reconstruction plates. Bending of these reconstruction plates is typically directed along the outer contour of the original mandible. Simultaneously or in a second operation vascularized or non-vascularized bone is fixed to the reconstruction plate. However, the prosthodontic-driven backward planning to ease bony reconstruction of the mandible in terms of dental rehabilitation using implant-retained overdentures might be an eligible solution. The purpose of this work was to develop, establish and clinically evaluate a novel 3D planning procedure for mandibular reconstruction. Materials and methods Three patients with tumors involving the mandible, which included squamous cell carcinoma in the floor of the mouth and keratocystic odontogenic tumor, were treated surgically by hemimandibulectomy. Results In primary alloplastic mandible reconstruction, shape and size of the reconstruction plate could be predefined and prebent prior to surgery. Clinical relevance This study provides modern treatment strategies for mandibular reconstruction. PMID:21968330

  3. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  4. Healthcare succession planning: an integrative review.

    Science.gov (United States)

    Carriere, Brian K; Muise, Melanie; Cummings, Greta; Newburn-Cook, Chris

    2009-12-01

    Succession planning is a business strategy that has recently gained attention in the healthcare literature, primarily because of nursing shortage concerns and the demand for retaining knowledgeable personnel to meet organizational needs. Little research has been conducted in healthcare settings that clearly defines best practices for succession planning frameworks. To effectively carry out such organizational strategies during these challenging times, an integrative review of succession planning in healthcare was performed to identify consistencies in theoretical approaches and strategies for chief nursing officers and healthcare managers to initiate. Selected articles were compared with business succession planning to determine whether healthcare strategies were similar to best practices already established in business contexts. The results of this integrative review will aid leaders and managers to use succession planning as a tool in their recruitment, retention, mentoring, and administration activities and also provide insights for future development of healthcare succession planning frameworks.

  5. Treatment planning for carcinoma of the cervix: a patterns of care study report

    International Nuclear Information System (INIS)

    Ling, C. Clifton; Smith, Alfred R.; Hanlon, Alexandra L.; Owen, Jean B.; Brickner, Theodore J.; Hanks, Gerald E.

    1996-01-01

    Purpose: The Patterns of Care Study (PCS) of patients treated in 1988-89 included 'patterns of treatment planning' for radiotherapy of carcinoma of the uterine cervix. A Consensus Committee of radiation physicists and oncologists established current guidelines and developed questionnaires to assess the treatment planning process (i.e., the general structure, methodology, and tools) of institutions involved in the Patterns of Care Study. This paper reports the findings of the assessment. Methods and Materials: The PCS surveyed 73 radiotherapy facilities, of which 21 are academic institutions (AC), 26 hospital-based facilities (HB), and 26 free-standing centers (FS). In total, 242 cases were assessed with 39% from academic centers, 33% from hospital-based centers, and 28% from free-standing centers. The survey collected treatment planning information such as the use of computed tomography (CT), simulation procedure, contouring of patient outline, tumor or target delineation, identification of critical structures, method of dose prescription (point or isodose), etc. Data was also obtained concerning implant boosts, e.g., radioisotope used, use of midline block for external beam treatment, availability of remote afterloader, practice of interstitial implants, combination with hyperthermia, etc. Results: There is a high degree of compliance relative to the basic treatment planning standards. For example, 171 cases (out of 173) from AC and HB institutions included simulation and 169 used port film; for cases from FS centers, 61 out of 69 involved simulation and 66 out of 69 included port film. Most institutions used linacs (231 out of 242); in five cases, Co-60 units and in six cases betatron was used. In terms of treatment planning, 53% used skin contours, but only 14% had target volume delineation, with AC and HB being slightly more conscientious in these efforts. Critical organs did not appear to be explicitly considered in external beam treatment planning, with only

  6. Providing Family Planning Services at Primary Care Organizations after the Exclusion of Planned Parenthood from Publicly Funded Programs in Texas: Early Qualitative Evidence.

    Science.gov (United States)

    White, Kari; Hopkins, Kristine; Grossman, Daniel; Potter, Joseph E

    2017-10-20

    To explore organizations' experiences providing family planning during the first year of an expanded primary care program in Texas. Between November 2014 and February 2015, in-depth interviews were conducted with program administrators at 30 organizations: 7 women's health organizations, 13 established primary care contractors (e.g., community health centers, public health departments), and 10 new primary care contractors. Interviews addressed organizational capacities to expand family planning and integrate services with primary care. Interview transcripts were analyzed using a theme-based approach. Themes were compared across the three types of organizations. Established and new primary care contractors identified several challenges expanding family planning services, which were uncommon among women's health organizations. Clinicians often lacked training to provide intrauterine devices and contraceptive implants. Organizations often recruited existing clients into family planning services, rather than expanding their patient base, and new contractors found family planning difficult to integrate because of clients' other health needs. Primary care contractors frequently described contraceptive provision protocols that were not evidence-based. Many primary care organizations in Texas initially lacked the capacity to provide evidence-based family planning services that women's health organizations already provided. © Health Research and Educational Trust.

  7. Lesson Planning the Kodaly Way.

    Science.gov (United States)

    Boshkoff, Ruth

    1991-01-01

    Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)

  8. SU-F-T-351: Establishing a Workflow for IMRT Pre-Treatment Reviews for NRG-GY006 Clinical Trial

    Energy Technology Data Exchange (ETDEWEB)

    Giaddui, T [Sidney Kimmel Cancer Center, Thomas Jefferson University, Philadelphia, PA (United States); Li, N; Moore, K; Mell, L [University of California, San Diego, San Diego, CA (United States); Curry, K [MIM Software, Inc., Clevealand, OH (United States); Leath, C [University of Alabama at Birmingham, Birmingham, AL (United States); Kunos, C [Northeastern Ohio University College, Clevealand, OH (United States); Xiao, Y [University of Pennsylvania, Philadelphia, PA (United States)

    2016-06-15

    Purpose: To establish a workflow for NRG-GY006 IMRT pre-treatment reviews, incorporating advanced radiotherapy technologies being evaluated as part of the clinical trial. Methods: Pre-Treatment reviews are required for every IMRT case as part of NRG-GY006 (a randomized phase II trial of radiation therapy and cisplatin alone or in combination with intravenous triapine in women with newly diagnosed bulky stage I B2, stage II, IIIB, or IVA cancer of the uterine cervix or stage II-IVA vaginal cancer. The pretreatment review process includes structures review and generating an active bone marrow(ABM)- to be used as an avoidance structure during IMRT optimization- and evaluating initial IMRT plan quality using knowledgeengineering based planning (KBP). Institutions will initially submit their simulation CT scan, structures file and PET/CT to IROC QA center for generating ABM. The ABM will be returned to the institution for use in planning. Institutions will then submit an initial IMRT plan for review and will receive information back following implementation of a KBP algorithm, for use in re-optimization, before submitting the final IMRT used for treatment. Results: ABM structure is generated using MIM vista software (Version 6.5, MIM corporation, Inc.). Here, the planning CT and the diagnostic PET/CT are fused and a sub threshold structure is auto segmented above the mean value of the SUV of the bone marrow. The generated ABM were compared with those generated with other software system (e.g. Velocity, Varian) and Dice coefficient (reflects the overlap of structures) ranged between 80 – 90% was achieved. A KBP model was built in Varian Eclipse TPS using the RapidPlan KBP software to perform plan quality assurance. Conclusion: The workflow for IMRT pretreatment reviews has been established. It represents a major improvement of NRG Oncology clinical trial quality assurance and incorporates the latest radiotherapy technologies as part of NCI clinical trials. This project

  9. SU-F-T-351: Establishing a Workflow for IMRT Pre-Treatment Reviews for NRG-GY006 Clinical Trial

    International Nuclear Information System (INIS)

    Giaddui, T; Li, N; Moore, K; Mell, L; Curry, K; Leath, C; Kunos, C; Xiao, Y

    2016-01-01

    Purpose: To establish a workflow for NRG-GY006 IMRT pre-treatment reviews, incorporating advanced radiotherapy technologies being evaluated as part of the clinical trial. Methods: Pre-Treatment reviews are required for every IMRT case as part of NRG-GY006 (a randomized phase II trial of radiation therapy and cisplatin alone or in combination with intravenous triapine in women with newly diagnosed bulky stage I B2, stage II, IIIB, or IVA cancer of the uterine cervix or stage II-IVA vaginal cancer. The pretreatment review process includes structures review and generating an active bone marrow(ABM)- to be used as an avoidance structure during IMRT optimization- and evaluating initial IMRT plan quality using knowledgeengineering based planning (KBP). Institutions will initially submit their simulation CT scan, structures file and PET/CT to IROC QA center for generating ABM. The ABM will be returned to the institution for use in planning. Institutions will then submit an initial IMRT plan for review and will receive information back following implementation of a KBP algorithm, for use in re-optimization, before submitting the final IMRT used for treatment. Results: ABM structure is generated using MIM vista software (Version 6.5, MIM corporation, Inc.). Here, the planning CT and the diagnostic PET/CT are fused and a sub threshold structure is auto segmented above the mean value of the SUV of the bone marrow. The generated ABM were compared with those generated with other software system (e.g. Velocity, Varian) and Dice coefficient (reflects the overlap of structures) ranged between 80 – 90% was achieved. A KBP model was built in Varian Eclipse TPS using the RapidPlan KBP software to perform plan quality assurance. Conclusion: The workflow for IMRT pretreatment reviews has been established. It represents a major improvement of NRG Oncology clinical trial quality assurance and incorporates the latest radiotherapy technologies as part of NCI clinical trials. This project

  10. Nuclear emergency planning in Norway

    International Nuclear Information System (INIS)

    Baarli, J.

    1986-01-01

    The nuclear emergency planning in Norway is forming a part of the Search and Rescue Service of the country. Due to the fact that Norway do not have any nucleat power reactor, the nuclear emergency planning has not been given high priority. The problems however are a part of the activity of the National Institute of Radiation Hygiene, and the emergency preparedness is at the present time to a large extent based on the availability of professional health physicists and their knowledge, rather than established practices

  11. 9 CFR 108.6 - Revision of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Revision of plot plans, blueprints... FACILITY REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.6 Revision of plot plans, blueprints, and legends... changes affecting the workflow are to be made. The licensee shall: (a) Prepare revised plot plans...

  12. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  13. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  14. Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Manwell, James [Univ. of Massachusetts, Amherst, MA (United States)

    2013-03-19

    The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

  15. Neuroscience discipline science plan

    Science.gov (United States)

    1991-01-01

    Over the past two decades, NASA's efforts in the neurosciences have developed into a program of research directed at understanding the acute changes that occur in the neurovestibular and sensorimotor systems during short-duration space missions. However, the proposed extended-duration flights of up to 28 days on the Shuttle orbiter and 6 months on Space Station Freedom, a lunar outpost, and Mars missions of perhaps 1-3 years in space, make it imperative that NASA's Life Sciences Division begin to concentrate research in the neurosciences on the chronic effects of exposure to microgravity on the nervous system. Major areas of research will be directed at understanding (1) central processing, (2) motor systems, (3) cognitive/spatial orientation, and (4) sensory receptors. The purpose of the Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive area of neurosciences. It covers the significant research areas critical to NASA's programmatic requirements for the Extended-Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines critical questions in the subdiscipline areas of nervous system function. It contains a general plan that will be used by NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational intramural and extramural research and development activities in this area.

  16. Corporate plan 1994/95 to 1998/99

    International Nuclear Information System (INIS)

    1994-04-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970. As with all non-departmental public bodies it is required to prepare a Corporate Plan against which its performance and the relevance of its activities to contemporary requirements can be measured. The Board has produced annual Corporate Plans since 1986. In this issue, summary sections on background, objectives, and finances are followed by fifteen sections describing the major areas of work in a structured manner with the Plan objectives, achievements, and alterations set out. Altogether, the Plan shows a good level of attainment and a clear sense of direction. (author)

  17. Government of Canada Action Plan 2000 on Climate Change

    International Nuclear Information System (INIS)

    2000-01-01

    In this first National Climate Change Business Plan the Government of Canada affirms its intention to invest up to $500 million over five years on specific actions to reduce greenhouse gas emissions. This sum is in addition to the action plans being put forward by the provincial and territorial governments and in addition to the $625 million investment over five years announced in Budget 2000. Action Plan 2000 targets key sectors, and the measures announced are expected to take Canada one third of the way to achieving the target established in the Kyoto Protocol by reducing Canada's GHG emissions by 65 megatonnes per year during the 2008-2012 commitment period. The key sectors targeted include the areas of transportation, oil, gas and electricity production, industry, buildings, forestry and agriculture, i. e. sectors that together account for over 90 per cent of Canada's GHG emissions.The Action Plan focuses on reducing GHG emissions in a cost effective way; draws extensively on the best ideas put forward by the provinces, territories and other stakeholders; encourages action by industry and consumers; complements measures and actions by the provinces and territories to address regional issues; and sets the stage for long-term behavioural, technological and economic changes. The remainder of Canada's Kyoto commitments will be addressed by actions in future plans which are currently in the process of being developed, together with the development of further details of this first National Climate Change Business Plan

  18. An Overview of the NASA Aeronautics Test Program Strategic Plan

    Science.gov (United States)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced

  19. NASA deep space network operations planning and preparation

    Science.gov (United States)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  20. Hanford site transuranic waste certification plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation Pilot Plant (WIPP), the Hanford Site must ensure that its TRU waste meets the requirements of U.S. Department of Energy (DOE) Order 5820.2A, ''Radioactive Waste Management, and the Waste Acceptance Criteria for the Waste Isolation Pilot Plant' (DOE 1996d) (WIPP WAC). The WIPP WAC establishes the specific physical, chemical, radiological, and packaging criteria for acceptance of defense TRU waste shipments at WIPP. The WIPP WAC also requires that participating DOE TRU waste generator/treatment/storage sites produce site-specific documents, including a certification plan, that describe their management of TRU waste and TRU waste shipments before transferring waste to WIPP. The Hanford Site must also ensure that its TRU waste destined for disposal at WIPP meets requirements for transport in the Transuranic Package Transporter41 (TRUPACT-11). The U.S. Nuclear Regulatory Commission (NRC) establishes the TRUPACT-I1 requirements in the ''Safety Analysis Report for the TRUPACT-II Shipping Package'' (NRC 1997) (TRUPACT-I1 SARP)

  1. Service user involvement in care planning: the mental health nurse's perspective.

    Science.gov (United States)

    Anthony, P; Crawford, P

    2000-10-01

    A dissonance between espoused values of consumerism within mental health care and the 'reality' of clinical practice has been firmly established in the literature, not least in terms of service user involvement in care planning. In order to begin to minimize such dissonance, it is vital that mental health nurse perceptions of service user involvement in the core activity of care planning are better understood. The main findings of this qualitative study, which uses semistructured interviews, suggest that mental health nurses value the concept of user involvement but consider it to be problematic in certain circumstances. The study reveals that nurses hold similar views about the 'meaning' of patient involvement in care planning but limited resources, individual patients characteristics and limitations in nursing care are the main inhibiting factors. Factors perceived as promoting and increasing user involvement included: provision of accurate information, 'user-friendly' documentation, mechanisms for gaining service user feedback, and high staff morale.

  2. Business plan writing for physicians.

    Science.gov (United States)

    Cohn, Kenneth H; Schwartz, Richard W

    2002-08-01

    Physicians are practicing in an era in which they are often expected to write business plans in order to acquire, develop, and implement new technology or programs. This task is yet another reminder of the importance of business principles in providing quality patient care amid allocation of increasingly scarce resources. Unfortunately, few physicians receive training during medical school, residencies, or fellowships in performing such tasks. The process of writing business plans follows an established format similar to writing a consultation, in which the risks, benefits, and alternatives to a treatment option are presented. Although administrative assistance may be available in compiling business plans, it is important for physicians to understand the rationale, process, and pitfalls of business planning. Writing a business plan will serve to focus, clarify, and justify a request for scarce resources, and thus, increase its chance of success, both in terms of funding and implementation. A well-written business plan offers a plausible, coherent story of an uncertain future. Therefore, a business plan is not merely an exercise to obtain funding but also a rationale for investment that can help physicians reestablish leadership in health care.

  3. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  4. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  5. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  6. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  7. ALARA and planning of interventions

    Energy Technology Data Exchange (ETDEWEB)

    Rocaboy, A. [Electricite de France, Avoine (France)

    1995-03-01

    The implementation of ALARA programs implies integration of radiation protection criterion at all stages of outage management. Within the framework of its ALARA policy, Electricide de France (EDF) has given an incentive to all of its nuclear power plants to develop {open_quotes}good practices{close_quotes} in this domain, and to exchange their experience by the way of a national feed back file. Among the developments in the field of outage organization, some plants have focused on the planning stage of activities because of its influence on the radiological conditions of interventions and on the good succession of tasks within the radiological controlled areas. This paper presents the experience of Chinon nuclear power plant. At Chinon, we are pursuing this goal through careful outage planning. We want the ALARA program during outages to be part of the overall maintenance task planning. This planning includes the provision of the availability of every safety-related component, and of the variations of water levels in hthereactor and steam generators to take advantage of the shield created by the water. We have developed a computerized data base with the exact position of all the components in the reactor building in order to avoid unnecessary interactions between different tasks performed in the same room. A common language between Operation and Maintenance had been established over the past years, using {open_quotes}Milestones and Corridors{close_quotes}. A real time dose rate counting system enables the Radiation Protection (RP) Department to do an accurate and efficient follow up during the outage for all the {open_quotes}ALARA{close_quotes} maintenance tasks.

  8. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  9. Extrapolational Look at the Current State of Territorial Strategic Planning in Russia

    Directory of Open Access Journals (Sweden)

    Bogomolova Irina Viktorovna

    2014-12-01

    Full Text Available Since the 90s, the ideas on territorial strategic planning have been progressively disseminated in Russia. A growing number of cities, regions and macroregions recognized the urgency of finding their individual path of development which would ensure the successful implementation of strategic plans. The author of the article distinguishes four stages of formation and development of territorial strategic planning in modern Russia on the basis of retrospective analysis. The special attention is paid to the contemporary period which started after the adoption of the Federal Law of June 28, 2014 no. 172 “On strategic planning in the Russian Federation” regulating the activity of federal, regional and municipal authorities in the field of strategic planning and management. For the first time in more than 20 years the common requirements to the system of strategic planning were established in Russia at the level of the legislative act. The strategic planning is officially recognized as the most important element in the system of strategic management contributing to the creation of conditions for sustainable territorial development. The author grounds the expediency and proves the necessity of legislative adoption of norms and principles of the strategic planning. The municipal level as an equal member of the strategic planning process is included in the system of strategic planning. In accordance with the adopted law, the strategies for socioeconomic development of the territory of the RF subject can be worked out in the region (for example, for several municipalities. It is necessary to develop specific goals, objectives and directions of development for each territory. This creates the conditions for planning the development of metropolitan areas as the territories of advanced development, as well as large intermunicipal investment projects and programs. On the basis of experience of strategic planning in Volgograd, the author makes constructive

  10. Establishing a Cancer Genetics Programme in Asia - the Singapore Experience

    Directory of Open Access Journals (Sweden)

    Chieng Wei-Shieng

    2006-06-01

    Full Text Available Abstract Cancer genetics is now an established oncology subspecialty with the primary prevention role of identifying high-risk individuals through genetic information for enrolment into screening and preventive programmes. Integrated into major Western centres since the late 1990s, such a programme has been established in Singapore since 2001. Our programme has evaluated 367 index patients comprising mainly breast and colorectal cancer cases. Cancer patients were receptive to genetic counselling, but cost posed a major barrier to genetic testing. However, when the cost barrier was removed through government subsidy plans, more than half of high-risk patients still declined testing. The major barriers were reluctance to involve family members, perception that the information would not change management, and fears of negative feelings. Confirmed mutation carriers were compliant to screening and receptive to prophylactic surgery. Uptake of predictive testing among cancer-free family members has been low, possibly arising from the stigma associated with cancer in our Asian culture. These potential barriers are being addressed through government subsidy plans, continuing education to increase awareness, and being culturally sensitive when dealing with the Asian family.

  11. Export of radiopharmaceuticals and establishment of export base of cyclotron

    International Nuclear Information System (INIS)

    Jung, Kyungil; Kim, Youngsik

    2006-01-01

    Sam young Unit ech has seized an opportunity to advance into the radiopharmaceuticals market through successful transfer of radiopharmaceuticals manufacturing technology and medical cyclotron, an original technology in nuclear medicine that is the core of less developed areas in nuclear-related fields. The company has continued to push for research development and establishment of market base through industry-academia-research center cooperation with an aim to complement relatively less developed domestic technology and market than in advanced countries, and is making efforts to establish export base in the overseas market based on stabilized supply in the domestic market. As for radiopharmaceuticals, the company is exporting Tc-99m generator to Vietnam, Thailand and the Philippines and preparing itself to export manufacture facilities for Tc-99m generator to Syria and Kazakhstan. In addition, it plans to export 13Mev Cyclotron that has been commercialized after being developed in the domestic market to the U. S. The company plans to grow up to play a pivotal role in the domestic RT area by conducting proactive business activities with an aim to revitalize the domestic market and further domestic original technologies and products in the global market

  12. Bringing Value-Based Perspectives to Care: Including Patient and Family Members in Decision-Making Processes

    Directory of Open Access Journals (Sweden)

    Graeme Kohler

    2017-11-01

    Full Text Available n a gap in consistent application of system-level strategies that can effectively translate organizational policies around patient and family engagement into practice. Methods The broad objective of this initiative was to develop a system-level implementation strategy to include patient and family advisors (PFAs at decision-making points in primary healthcare (PHC based on wellestablished evidence and literature. In this opportunity sponsored by the Canadian Foundation for Healthcare Improvement (CFHI a co-design methodology, also well-established was applied in identifying and developing a suitable implementation strategy to engage PFAs as members of quality teams in PHC. Diabetes management centres (DMCs was selected as the pilot site to develop the strategy. Key steps in the process included review of evidence, review of the current state in PHC through engagement of key stakeholders and a co-design approach. Results The project team included a diverse representation of members from the PHC system including patient advisors, DMC team members, system leads, providers, Public Engagement team members and CFHI improvement coaches. Key outcomes of this 18-month long initiative included development of a working definition of patient and family engagement, development of a Patient and Family Engagement Resource Guide and evaluation of the resource guide. Conclusion This novel initiative provided us an opportunity to develop a supportive system-wide implementation plan and a strategy to include PFAs in decision-making processes in PHC. The well-established co-design methodology further allowed us to include value-based (customer driven quality and experience of care perspectives of several important stakeholders including patient advisors. The next step will be to implement the strategy within DMCs, spread the strategy PHC, both locally and provincially with a focus on sustainability.

  13. Environmental protection by cost minimization: Least Cost Planning for traffic. Includes a guide for the application in local communities; Umweltentlastung durch Kostenminimierung: Least Cost Planning im Verkehr. Mit Leitfaden fuer die Anwendung in Kommunen

    Energy Technology Data Exchange (ETDEWEB)

    Bracher, T.; Diegmann, V.; Eckart, C.F.; Liwicki, M.; Lobenberg, G.; Wetzel, C. [Gesellschaft fuer Informatik, Verkehrs- und Umweltplanung mbH (IVU), Berlin (Germany); Bergmann, M.; Uricher, A.; Lueers, A. [Oeko-Institut, Inst. fuer Angewandte Oekologie e.V., Freiburg im Breisgau (Germany); Becker, U.; Karl, G.; Karl, B.; Voellings, A. [Technische Univ. Dresden (Germany). Lehrstuhl fuer Verkehrsoekologie

    1999-08-01

    An intermodal approach for the evaluation of transportation services on the municipal level was developed. Both non-motorised and motorised transportation were included. The approach aims at helping communities to provide an economically and ecologically viable transport policy. Least Cost Transportation Planning (LCTP) was developed to transfer the successful concept of Least Cost Planning from the energy sector to transportation. The conclusion from an analysis of LCTP literature and present evaluation methods was that an improved approach should be intermodal and integrate users, public bodies and transport companies as well as all planning sectors. An approach was developed firstly to identify and clarify transportation expenditures and incomes of a city within a year, and secondly for the evaluation of planning alternatives. This was illustrated for the access system of an industrial area with adjacent railway services in the town of Freiburg. Three alternatives were compared: the extension of a tramway line, the upgrading of the present bus system, and the development of a service and bicycle provision concept for rail stations and companies. Besides income and expenditure for each alternative, the effects on transport demand, the impact on air pollution and noise and on space consumption were presented. As a result, the bicycle concept is in most items better than its alternatives. The final report has three volumes and there is an extra guideline for implementing the method within municipalities. It includes a set of excel sheet tables for an easy application (all in German). (orig.) [German] Fuer die Verkehrsplanung wurde ein verkehrstraegeruebergreifendes Bewertungsverfahren fuer Kommunen entwickelt, das motorisierte und nicht motorisierte Verkehrstraeger einbezieht. Das Verfahren soll Gemeinden unterstuetzen, eine oekonomische und oekologisch vertraegliche Verkehrspolitik zu verfolgen. Least Cost Transportation Planning (LCTP) zielt darauf ab, das fuer

  14. Planning, Anticipatory Systems, and Kinds of Actors

    Science.gov (United States)

    Jorna, René; van Wezel, Wout

    2002-09-01

    Anticipation and planning have much in common. Anticipation means being ahead of things. Planning means not only anticipating on things to come, but also trying to determine a course of action to reach a goal. Planning is investigated in many domains, for example, in economy, biology, and in the cognitive sciences. Each of these domains uses its own research methodologies, languages, ontologies, and models. Although there are many differences between the various approaches and models, there must of course also be similarities, since they all deal with establishing a future course of actions to reach a goal. We will compare several planning approaches on a number of aspects, e.g., the kind of entity that makes the plan (natural or artificial), whether the plan is executed by the planner or by another entity, representational issues, and the domain that the plan is executed in. Our article focuses on analytical dimensions in the extended field of planning. We do not discuss empirical results.

  15. Achieving Sustainable Value Planning For Malaysian Public Projects

    Directory of Open Access Journals (Sweden)

    Muhammad Faudzi

    2016-01-01

    Full Text Available Sustainability is the central development issue in the modern economy. Through sustainable development, quality of life can be improved or maintained over time. Since Malaysia is targeting to become a high-income nation by the year 2020, financial investment in public projects should be planned comprehensively so that it will generate immediate and long-term benefits to the country and the people. Within the currently tight financial environment, achieving value for money in public spending is seen as one of the enablers to maintain the right momentum of economic growth. Previous studies have established the importance of integrating sustainability consideration into Value Planning protocol in order to achieve value for money, underpinned by the sustainable development agenda. Despite the establishment of the framework for the integration, the opportunity of such integration within the Malaysian Value Planning protocol for public projects remains unclear. The present state of sustainability consideration within the Value Planning practice should be first evaluated, so that potential interventions to enhance the integration can be introduced. Responding to the gap, this exploratory study was conducted. The data was collected by means of document analysis, interviews and observations; subsequently analysed using the Template Analysis technique. Based on the current practice of Value Planning in Malaysia, ten interventions are proposed to transform the present practice into Sustainable Value Planning. Sustainable Value Planning is seen as a comprehensive concept in achieving value for money in public spending underpinned by the overarching concept of sustainability

  16. Improvement of the public administration system of higher educational establishments

    Directory of Open Access Journals (Sweden)

    Andrei Vyacheslavovich Romin

    2015-10-01

    Full Text Available During research found that state regulation of higher education establishments activity is a special branch of the state, during which its authorities with the help of planning, organizing, monitoring is carried out the current regulation of the activities of higher education establishments, provide organization (integrationof the total interaction of students and teachers. Proposed to allocate the financial strategy of higher educational establishments as a major in strategic management of the higher education system. In this regard, it argued that the integration capacity of the university to the regional reproductive system will optimize government funding of higher educational establishments. Also, it helps to determine the main directions of further economic and financial development of the higher education system, prioritizing the development of already existing educational and training facilities in different regions of the state, the provision of appropriate state support for higher education establishments, which training necessary specialists for the state’s economy. The improvement the public administration system of a high school should be carried out through the formation of a coordination mechanism for higher education establishments. The introduction of this mechanism will provide an opportunity to identify the main activities of the higher education establishments adapt to the operating conditions of the region, based on the trends in the development of higher education, and to provide the basic needs of the labor market in the relevant specialists.

  17. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  18. [Landscape planning approaches for biodiversity conservation in agriculture].

    Science.gov (United States)

    Liu, Yun-hui; Li, Liang-tao; Yu, Zhen-rong

    2008-11-01

    Biodiversity conservation in agriculture not only relates to the sustainable development of agriculture, but also is an essential part of species conservation. In recent years, the landscape planning approach for biodiversity was highlighted instead of species-focused approach. In this paper, the landscape factors affecting the biodiversity in agriculture were reviewed, and the possible landscape approaches at three different scales for more efficient conservation of biodiversity in agro-landscape were suggested, including: (1) the increase of the proportion of natural or semi-natural habitats in agriculture, diversification of land use or crop pattern, and protection or construction of corridor at landscape level; (2) the establishment of non-cropping elements such as field margin at between-field level; and (3) the application of reasonable crop density, crop distribution pattern and rotation, and intercrop etc. at within-field level. It was suggested that the relevant policies for natural conservation, land use planning, and ecological compensation should be made to apply the landscape approaches for biodiversity conservation at larger scale.

  19. Human Capital Management Plan Fiscal Years 2003- 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-03-09

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Western’s workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Western’s human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Western’s human capital needs. The team used the assessment to draft a framework that

  20. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    Science.gov (United States)

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  1. Strategic Energy Management Plan for the Santa Ynez Band of Chumash Indians

    Energy Technology Data Exchange (ETDEWEB)

    Davenport, Lars [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Smythe, Louisa [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Sarquilla, Lindsey [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Ferguson, Kelly [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States)

    2015-03-27

    This plan outlines the Santa Ynez Band of Chumash Indians’ comprehensive energy management strategy including an assessment of current practices, a commitment to improving energy performance and reducing overall energy use, and recommended actions to achieve these goals. Vision Statement The primary objective of the Strategic Energy Management Plan is to implement energy efficiency, energy security, conservation, education, and renewable energy projects that align with the economic goals and cultural values of the community to improve the health and welfare of the tribe. The intended outcomes of implementing the energy plan include job creation, capacity building, and reduced energy costs for tribal community members, and tribal operations. By encouraging energy independence and local power production the plan will promote self-sufficiency. Mission & Objectives The Strategic Energy Plan will provide information and suggestions to guide tribal decision-making and provide a foundation for effective management of energy resources within the Santa Ynez Band of Chumash Indians (SYBCI) community. The objectives of developing this plan include; Assess current energy demand and costs of all tribal enterprises, offices, and facilities; Provide a baseline assessment of the SYBCI’s energy resources so that future progress can be clearly and consistently measured, and current usage better understood; Project future energy demand; Establish a system for centralized, ongoing tracking and analysis of tribal energy data that is applicable across sectors, facilities, and activities; Develop a unifying vision that is consistent with the tribe’s long-term cultural, social, environmental, and economic goals; Identify and evaluate the potential of opportunities for development of long-term, cost effective energy sources, such as renewable energy, energy efficiency and conservation, and other feasible supply- and demand-side options; and Build the SYBCI’s capacity for

  2. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  3. Monitoring process hygiene in Serbian retail establishments

    Science.gov (United States)

    Vesković Moračanin, S.; Baltić, T.; Milojević, L.

    2017-09-01

    The present study was conducted to estimate the effectiveness of sanitary procedures on food contact surfaces and food handlers’ hands in Serbian retail establishments. For that purpose, a total of 970 samples from food contact surfaces and 525 samples from workers’ hands were microbiologically analyzed. Results of total aerobic plate count and total Enterobacteriaceae count showed that the implemented washing and disinfection procedures, as a part of HACCP plans, were not effective enough in most retail facilities. Constant and intensive education of employees on proper implementation of sanitation procedures are needed in order to ensure food safety in the retail market.

  4. Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1978-01-01

    The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential performance of heat pumps, data required from cooling contractors, cooling locations, thermal outputs: cooling, recommended inputs for the 25 ton advanced cooling simulation study, meteorological data, and contract modification. (MHR)

  5. Methods to establish flaw tolerances

    International Nuclear Information System (INIS)

    Varga, T.

    1978-01-01

    Three conventional methods used to establish flaw tolerances are compared with new approaches using fracture mechanics. The conventional methods are those based on (a) non-destructive testing methods; (b) fabrication and quality assurance experience; and (c) service and damage experience. Pre-requisites of fracture mechanics methods are outlined, and summaries given of linear elastic mechanics (LEFM) and elastoplastic fracture mechanics (EPFM). The latter includes discussion of C.O.D.(crack opening displacement), the J-integral and equivalent energy. Proposals are made for establishing flaw tolerances. (U.K.)

  6. Idaho National Laboratory Site Pollution Prevention Plan

    International Nuclear Information System (INIS)

    E. D. Sellers

    2007-01-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  7. Idaho National Laboratory Site Pollution Prevention Plan

    Energy Technology Data Exchange (ETDEWEB)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  8. Robustness of mission plans for unmanned aircraft

    Science.gov (United States)

    Niendorf, Moritz

    This thesis studies the robustness of optimal mission plans for unmanned aircraft. Mission planning typically involves tactical planning and path planning. Tactical planning refers to task scheduling and in multi aircraft scenarios also includes establishing a communication topology. Path planning refers to computing a feasible and collision-free trajectory. For a prototypical mission planning problem, the traveling salesman problem on a weighted graph, the robustness of an optimal tour is analyzed with respect to changes to the edge costs. Specifically, the stability region of an optimal tour is obtained, i.e., the set of all edge cost perturbations for which that tour is optimal. The exact stability region of solutions to variants of the traveling salesman problems is obtained from a linear programming relaxation of an auxiliary problem. Edge cost tolerances and edge criticalities are derived from the stability region. For Euclidean traveling salesman problems, robustness with respect to perturbations to vertex locations is considered and safe radii and vertex criticalities are introduced. For weighted-sum multi-objective problems, stability regions with respect to changes in the objectives, weights, and simultaneous changes are given. Most critical weight perturbations are derived. Computing exact stability regions is intractable for large instances. Therefore, tractable approximations are desirable. The stability region of solutions to relaxations of the traveling salesman problem give under approximations and sets of tours give over approximations. The application of these results to the two-neighborhood and the minimum 1-tree relaxation are discussed. Bounds on edge cost tolerances and approximate criticalities are obtainable likewise. A minimum spanning tree is an optimal communication topology for minimizing the cumulative transmission power in multi aircraft missions. The stability region of a minimum spanning tree is given and tolerances, stability balls

  9. ESTABLISHMENT OF THE PERMISSIBLE TRAIN SPEED ON THE CURVED TURNOUTS

    Directory of Open Access Journals (Sweden)

    O. M. Patlasov

    2016-04-01

    Full Text Available Purpose. Turnouts play a key role in the railway transportation process. One-sided and many-sided curved turnouts were railed over the last 20 years in difficult conditions (curved sections, yard necks. They have a number of geometric features, unlike the conventional one-sided turnouts. Today the normative documents prohibit laying such turnouts in curved track sections and only partially regulate the assessment procedure of their real condition. The question of establishment the permissible train speed within the curved turnouts is still open. In this regard, authors propose to set the train speed according to the driving comfort criterion using the results of field measurements of ordinates from the baseline for the particular curved turnout. Methodology. The article considers the criteria using which one can set the permissible speed on the turnouts. It defines the complexity of their application, advantages and disadvantages. Findings. The work analyzes the speed distribution along the length of the real curved turnout for the forward and lateral directions. It establishes the change rate values of unbalanced accelerations for the existing norms of the curved track sections maintenance according to the difference in the adjacent bend versine at speeds up to 160 km/h. Originality. A method for establishing the trains’ speed limit within the curved turnouts was developed. It takes into account the actual geometric position in the plan of forward and lateral turnout directions. This approach makes it possible to establish a barrier places in plan on the turnouts limiting the train speed. Practical value. The proposed method makes it possible to objectively assess and set the trains’ permissible speed on the basis of the ordinate measurement of the forward and lateral directions of the curved turnouts from the baseline using the driving comfort criteria. The method was tested using real turnouts, which are located within the Pridneprovsk

  10. Establishing National Carbon Emission Prices for China

    NARCIS (Netherlands)

    C-L. Chang (Chia-Lin); T.K. Mai (Te-Ke); M.J. McAleer (Michael)

    2018-01-01

    textabstractThe purpose of the paper is to establish national carbon emissions prices for the People’s Republic of China, which is one of the world’s largest producers of carbon emissions. Several measures have been undertaken to address climate change in China, including the establishment of a

  11. Coal Corporation of Victoria strategic plan

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    The Coal Corporation has been established by the Victorian Parliament to plan for and to manage the responsible utilisation of the brown coal resource (Victoria's most abundant fossil resource) in order to underpin economic growth and job creation. For each of 5 issues, the Strategic Plan outlines the current situation, reviews recent factors which have affected or may affect the situation and outlines the goals, strategies and targets which have been set for the period 1985/1989. In each case, the achievements to date are also outlined. The issues addressed are: project development, marketing, resource planning and inter corporate relations, organisation of the Corporation, and finance.

  12. Environmental performance evaluation of Beijing's energy use planning

    International Nuclear Information System (INIS)

    Wang Lei; Xu Linyu; Song Huimin

    2011-01-01

    In line with rapid economic development, urban energy consumption is increasing rapidly, resulting in environmental problems. After considering several methods to evaluate the environmental performance of energy use, including: energy ecological footprint, input-output analysis, emergy-exergy analysis, and multi-criteria decision-making, an environmental performance evaluation model is proposed, which combines the analytical hierarchy process, fuzzy extent analysis, and membership degree analysis. In the model, 18 sub-indicators of environmental performance from energy use planning are classified into four categories: structure of energy use and industry, technology and efficiency of energy use, environmental impacts caused by energy use, and the socio-economic benefits of energy use. Membership degree analysis is applied to each indicator. Three energy use scenarios which are, respectively, environment-friendly, technology-led, and economic policy-led are evaluated. The results show that the technology-led energy use planning is best. The sustainable energy use policies are proposed from three aspects, including optimizing the energy use and industrial structure, encouraging development of energy-saving and air pollution control technologies, and enhancing legislation on energy use management. The policies are helpful to optimize the trade-offs between economic growth and environmental protection in Beijing. - Highlights: → Our paper establishes a system of indicators according to the structure of urban energy use planning. → We have created a comprehensive environmental performance evaluation model in the research. → The model and results can serve as an important basis for decision-making to guide local government.

  13. EG and G Idaho Environmental Protection Implementation Plan (1990)

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  14. EG and G Idaho Environmental Protection Implementation Plan (1991)

    Energy Technology Data Exchange (ETDEWEB)

    Graham, J.F.

    1991-11-01

    This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  15. EG and G Idaho Environmental Protection Implementation Plan (1991)

    International Nuclear Information System (INIS)

    Graham, J.F.

    1991-11-01

    This report describes the EG ampersand G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab

  16. Energy Strategy and Regional Planning in Croatia

    International Nuclear Information System (INIS)

    Toljan, I.

    1997-01-01

    The paper describes the relationship between energy strategy and regional planning in Croatia, the targets, environmental issues and preconditions to be met for the establishment of a modern energy sector. (author)

  17. Maternal and newborn outcomes in planned home birth vs planned hospital births: a metaanalysis.

    Science.gov (United States)

    Wax, Joseph R; Lucas, F Lee; Lamont, Maryanne; Pinette, Michael G; Cartin, Angelina; Blackstone, Jacquelyn

    2010-09-01

    We sought to systematically review the medical literature on the maternal and newborn safety of planned home vs planned hospital birth. We included English-language peer-reviewed publications from developed Western nations reporting maternal and newborn outcomes by planned delivery location. Outcomes' summary odds ratios with 95% confidence intervals were calculated. Planned home births were associated with fewer maternal interventions including epidural analgesia, electronic fetal heart rate monitoring, episiotomy, and operative delivery. These women were less likely to experience lacerations, hemorrhage, and infections. Neonatal outcomes of planned home births revealed less frequent prematurity, low birthweight, and assisted newborn ventilation. Although planned home and hospital births exhibited similar perinatal mortality rates, planned home births were associated with significantly elevated neonatal mortality rates. Less medical intervention during planned home birth is associated with a tripling of the neonatal mortality rate. Copyright 2010 Mosby, Inc. All rights reserved.

  18. Analysis, Reconstruction and Establishment Tourist Destination in Toba Samosir, North Sumatera, Indonesia

    Directory of Open Access Journals (Sweden)

    Menara Simanjuntak

    2012-09-01

    Full Text Available This study aimed to provide inputs for local government of Toba Samosir (Tobasa in preparing strategic development plan of tourist destinations in District Tobasa. This study is a qualitative approach through in-depth interviews and feedback from forum discussion groups with participants representing community leaders, indigenous peoples, governments and travel business. Total participants are 15 people collected on June 1, 2012 at Balige government office. Discussion forums formulated nine locations of tourist destination spread in Toba Samosir. As result this research, we formulated four strategic plans with tactical plans; (1 specifying and establish the location of tourist destinations in the District Tobasa; (2 submitting plans to the government budget or through the budget of Tobasa district in five years starting in 2014 to follow; (3 conducting government financing for infrastructure development and tourism industry participation; (4 doing tourism and cultural promotion. We found limitations for the plan. Some of them were: the low budget provided by the District government so that we expected supports from domestic investors to accelerate tourism development in the area. Most activities were proposed under the action plan of both Tobasa District government and North Sumatra Government.

  19. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Science.gov (United States)

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor...

  20. Establishing the quality assurance programme for a nuclear power plant project

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide provides requirements, recommendations and illustrative examples for establishing the overall quality assurance programme, and its constituent programmes, for a nuclear power plant project. It also provides guidance on the planning and documenting of programme plans and actions that are intended to ensure the achievement of the appropriate quality throughout the design, procurement, manufacture, construction, commissioning, operation and decommissioning of the nuclear power plant. The provisions of this Safety Guide are applicable to all organizations performing activities affecting the quality of items important to safety, such as designing, purchasing, fabricating, manufacturing, handling, shipping, storing, cleaning, erecting, installing, testing, commissioning, operating, inspecting, maintaining, repairing, refuelling, modifying and decommissioning