WorldWideScience

Sample records for plan implementation

  1. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  2. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  3. Strategic implementation plan

    Science.gov (United States)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  4. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  5. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  6. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  7. Effective Implementation of Urban Planning

    Institute of Scientific and Technical Information of China (English)

    WANG Xun-guo

    2002-01-01

    We analyze the factors that affect the efficiency and function of city planning in practical implementation,especially those of detailed planning. Two key principles and three strategies for plan to reach effective implementation are discussed so that the inflexibility and non- effectiveness of plans can be lessened.

  8. TRUPACT-1 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  9. Conduct of operations implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  10. Environmental implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  11. Land Use Control Implementation Plan

    Science.gov (United States)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  12. Total Quality Management Implementation Plan.

    Science.gov (United States)

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  13. 10 CFR 820.65 - Implementation plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  14. Individualized Career Plan (ICP): Implementation Manual.

    Science.gov (United States)

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  15. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  16. Developing and Implementing a Marketing Plan.

    Science.gov (United States)

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  17. Developing and Implementing a Marketing Plan.

    Science.gov (United States)

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  18. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Science.gov (United States)

    2010-10-01

    ... implementation plan and implementation regulations for a financed program on the business plan. The... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... methodology; (3) The maximum reduction cost; (4) The reduction-cost funding, if any, other than Federal...

  19. Maintenance Implementation Plan for the Grout Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yoakum, A.K.

    1993-08-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the Grout Treatment Facility will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter 2.0 Nuclear Facilities (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

  20. 76 FR 52387 - Approval and Promulgation of Implementation Plans; New Mexico; Federal Implementation Plan for...

    Science.gov (United States)

    2011-08-22

    ... ports, a neural network system, and a pulse jet fabric filter. However, when making the NO X BART... Implementation Plans; New Mexico; Federal Implementation Plan for Interstate Transport of Pollution Affecting... CFR Part 52 EPA-R06-OAR-2010-0846; FRL-9451-1 Approval and Promulgation of Implementation Plans;...

  1. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. SSA FITARA Common Baseline Implementation Plan

    Data.gov (United States)

    Social Security Administration — This document describes the agency's plan to implement the Federal Information Technology Acquisition Reform Act (FITARA) Common Baseline per OMB memorandum M-15-14.

  3. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  4. Waste generator services implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  5. Enterprise resource planning implementation decision & optimization models

    Institute of Scientific and Technical Information of China (English)

    Wang Shaojun; Wang Gang; Lü Min; Gao Guoan

    2008-01-01

    To study the uncertain optimization problems on implementation schedule, time-cost trade-off and quality in enterprise resource planning (ERP) implementation, combined with program evaluation and review technique (PERT), some optimization models are proposed, which include the implementation schedule model, the timecost trade-off model, the quality model, and the implementation time-cost-quality synthetic optimization model. A PERT-embedded genetic algorithm (GA) based on stochastic simulation technique is introduced to the optimization models solution. Finally, an example is presented to show that the models and algorithm are reasonable and effective, which can offer a reliable quantitative decision method for ERP implementation.

  6. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  7. Experiment! planning, implementing and interpreting

    CERN Document Server

    Andersson, Oivind

    2012-01-01

    Experiments are the most effective way to learn about the world. By cleverly interfering with something to see how it reacts we are able to find out how it works. In contrast to passive observation, experimenting provides us with data relevant to our research and thus less time and effort is spent separating relevant from irrelevant information. The art of experimentation is often learnt by doing, so an intuitive understanding of the experimental method usually evolves gradually through years of trial and error. This book speeds up the journey for the reader to becoming a proficient experimenter. Organized in two parts, this unique text begins by providing a general introduction to the scientific approach to experimentation. It then describes the processes and tools required, including the relevant statistical and experimental methods. Towards the end of the book a methodology is presented, which leads the reader through the three phases of an experiment: 'Planning', 'Data Collection', and 'Analysis and S...

  8. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  9. 222-S Laboratory maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Heinemann, J.L.

    1997-08-13

    This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and responsibilities as they apply specifically to 222-S Laboratory. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion section as applied to 222-S Laboratory implementation has been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to keep this document current and in compliance with DOE requirements.

  10. Adaptation: resources now to plan and implement

    Energy Technology Data Exchange (ETDEWEB)

    Huq, Saleemul

    2011-11-15

    Wealthy nations have committed to support developing countries to establish National Adaptation Plans (NAPs) that identify long-term priorities for responding to climate change challenges. But how and when will this support be given? Past experience suggests that national adaptation planning in expectation of future international funding is fraught with difficulties. Contributors to fast-start climate finance should release funds to developing countries straight away. These funds must be sufficient to plan longer-term adaptation strategies as well as implement immediate priorities. Equally importantly, recipients of these funds must decide for themselves how best to spend it.

  11. Enterprise Resource Planning Implementation in Higher Education

    Science.gov (United States)

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  12. NASA Education Implementation Plan 2015-2017

    Science.gov (United States)

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  13. 40 CFR 49.10046 - Contents of implementation plan.

    Science.gov (United States)

    2010-07-01

    ... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...

  14. Interim Land Use Control Implementation Plan

    Science.gov (United States)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  15. Gen IV Materials Handbook Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  16. Project implementation plan: ASTD remote deployment

    Energy Technology Data Exchange (ETDEWEB)

    CRASS, D.W.

    1999-08-18

    This Project Implementation Plan (PIP) shall be the controlling document for the Accelerated Site Technology Deployment (ASTD) supported project to procure and qualify a remote/robotic work platform for large hot cell deactivation in the 324 Building B-Cell. This plan will be integrated into the 324/327 Buildings Stabilization/Deactivation Project, Project Management Plan, (HNF-IP-1289, Rev. 1) and shall comply with the base requirements established in that document. This PIP establishes the baseline and defines the scope, schedule, budget, organizational responsibilities, reporting requirements, deliverables, and end points for the implementation of new technology into B-Cell. This shall include procurement, safety, quality assurance, training, documentation, record management, and facility modifications applicable to this project. Specifically this plan controls and executes the procurement and acceptance, qualification, and turnover of a remote/robotic work platform for 324 Building B-Cell. This includes the development of functional parameters, performance requirements, evaluation criteria, procurement specifications, acceptance and qualification test procedures, training requirements, and turnover responsibilities. The 324/237 Buildings Stabilization/Deactivation Project is currently in its second year of a nine-year project to complete deactivation and closure of the facility for long-term surveillance and maintenance. A major obstacles for the project is the inability to effectively perform deactivation tasks within high radioactively contaminated hot cells. The current strategies utilize inefficient and resource intensive technologies that significantly impact the cost and schedule for stabilization and deactivation. The ASTD Remote Deployment Project shall identify, procure, and turnover, to the B-Cell project, a remote/robot work platform to improve B-Cell cleanup productivity and enhance worker safety and health.

  17. 49 CFR 37.143 - Paratransit plan implementation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Paratransit plan implementation. 37.143 Section 37... WITH DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.143 Paratransit plan implementation. (a) Each entity shall begin implementation of its complementary paratransit plan, pending...

  18. 12 CFR 1291.3 - AHP Implementation Plan.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false AHP Implementation Plan. 1291.3 Section 1291.3...' AFFORDABLE HOUSING PROGRAM § 1291.3 AHP Implementation Plan. (a) Adoption; no delegation. Each Bank, after consultation with its Advisory Council, shall adopt a written AHP Implementation Plan, and shall not amend...

  19. WHC natural phenomena hazards mitigation implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  20. 327 Building fire hazards analysis implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Eggen, C.D.

    1998-09-16

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7.

  1. 75 FR 29897 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Science.gov (United States)

    2010-05-28

    .... What is the history and time frame for State Implementation Plan (SIP) submissions? II. What was... is EPA's conclusion? V. Statutory and Executive Order Reviews I. What is the history and time frame... Container Spillage Control.'' The intended effect of this action is to approve control strategies,...

  2. NYIT Energy Advisory Service implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Tenen, G.B.

    1976-08-26

    The philosophic basis and proposed implementation of an energy outreach program were set forth in a proposal of December 5, 1975 and in a revised proposal and budget of March 22, 1976, submitted after consultation with ERDA officials. The objectives and scope of work for the initial ten-month period presently contracted, and for the balance of the proposed two-year program, are summarized in the ERDA document ''Project: Outreach Program for Energy Information Dissemination in Adjacent Areas of New York, New Jersey, and Connecticut''. A copy is included at the end of this report. The implementation plan set forth here specifies the nature and the time schedule of the work to be accomplished throughout the tem-month and the two-year periods. In order to disseminate information to target audiences, the institute will utilize various energy technology channels of communications, including, the Energy Information Center; NYIT Energy Hot Line; Metropolitan Regional Council Television Seminars; Referral Services; press releases; technical assisance teams; newspaper question-and-answer columns; traveling displays; contests; conferences; radio spots; volunteers; and Center for Energy Policy and Research Periodical. All energy topics are included, but priority in the short term will be given to energy management programs for small commercial/industrial plants; residential building insulation and weatherization; solar hot water heating and solar space heating systems; and heat pumps. (MCW)

  3. 76 FR 33651 - Approval and Promulgation of Implementation Plans; ID

    Science.gov (United States)

    2011-06-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; ID AGENCY: Environmental... Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal... through 668. Sec. 52.670 Identification of plan. * * * * * (c) * * * EPA-Approved Idaho Regulations State...

  4. KNOWLEDGE MANAGEMENT AND ENTERPRISE RESOURCE PLANNING IMPLEMENTATION: A CONCEPTUAL MODEL

    Directory of Open Access Journals (Sweden)

    Sevenpri Candra

    2014-01-01

    Full Text Available The purpose of this research is examining the influence of organizational learning and knowledge management in enterprise resource planning implementation. This study is based on organizational learning, knowledge management and enterprise resource planning implementation. This research did not test all organizational factors and focus particularly on knowledge management capacity and absorptive capability. Enterprise resource planning implementation successful is a must. In today’s global and competitor in business, enterprise resource planning is becoming one of the main tools to achieve competitiveness in business. Enterprise resource planning is an infrastructure to create and maintain business to improve front-office and back-office efficiency and effectiveness. This study is significant to bring new thinking in determines the key antecedents to successful enterprise resource planning implementation based on knowledge management perspectives and it will helps to understand the key success factor in enterprise resource planning implementation.

  5. Implementation planning for industrial energy conservation: approach and methodology

    Energy Technology Data Exchange (ETDEWEB)

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  6. [From national strategic plans to operational implementation: opportunities and risks].

    Science.gov (United States)

    Etchepare, M

    2013-01-01

    Currently, all countries in Africa are - to various degrees - involved in reform and planning programs, either because they chose to or at the behest of international institutions working with them. Here we present an operational definition of a strategic plan and then analyze the factors that promote and constrain the planning process and the implementation of the plan thus developed.

  7. Experiences and problems in implementing the spatial plans of municipalities

    Directory of Open Access Journals (Sweden)

    Šećerov Velimir

    2010-01-01

    Full Text Available Since the adoption of the Planning and Construction Law, 2003., started the producing of the series of spatial plans, among which the most dominant position have the spatial plans of municipalities. Legal obligation and, less frequently, the understanding of the necessity of adopting and implementing this type of plan, contributed to the fact that they are made today in the most cases. Compliance with the procedures of making the local (municipal spatial plan is an assumption to his adoption, while its implementation is left to the decision makers at the local level and capacities that local self-governments has. In order to implement the plan as much as possible, necessary is to prescribe the clear measures and instruments for his realization and to define the precise implementation mechanisms that will contribute to his implementation. For this reason this paper aims to highlight some examples of the past practice in making the planning documentation and to point out some problems in their implementation that may occur due to a different understanding of the municipal spatial plan importance and his implementation mechanisms. The intention is to emphasis the strategic component of the municipal spatial plan and its developmental importance, in relation to the technical and regulatory dimension that such kind of a document has and which can be often found in practice through the insistence on the rules of planning and construction as the only implementation mechanisms. .

  8. Implementing the European SEA Directive in planning

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    The paper describes how the European SEA Directive can complement the existing planning practice in Denmark.......The paper describes how the European SEA Directive can complement the existing planning practice in Denmark....

  9. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false PTC Implementation Plan content requirements. 236... Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. Link to an...) How the PTC railroad intends to comply with §§ 236.1009(c) and (d); (3) How the PTC system will...

  10. Total Quality Management Office for Contracting Integrity Implementation Plan

    Science.gov (United States)

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  11. 76 FR 14584 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Attainment Plan for Libby...

    Science.gov (United States)

    2011-03-17

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Montana; Attainment... ) national ambient air quality standard (NAAQS) for the Libby nonattainment area. The plan revision, herein... and transit projects are consistent with (``conform to'') the state air quality implementation plan...

  12. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  13. Strategic Planning Implementation in Indonesia’s Transmigration Plan.

    Science.gov (United States)

    1984-06-01

    replaced the Hinduism of the :ndonesians. (Now 90 7,ercent of Indonesia are moslem) excekt for the Balinese, some Javanese , and some Chinese. Currently...block number) I Transmigration, Indonesia , Strategic Planning,"Indon ia s e- velopment Plan, Presidential Decree, t N ASe- Migration, Strategy, Racial...84 5 LIST OF TABLES I. Pcpulation Density of Indonesia in 1978 and 1980 .. ....... ....... ...... *,2 II. Distribution

  14. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  15. ISM analysis on enterprise resource planning(ERP) implementation

    Institute of Scientific and Technical Information of China (English)

    JING Ran-zhe; QIN Zheng

    2004-01-01

    Factors that influence enterprise resource planning(ERP) implementation in enterprises were described, and according to their interaction with each other, these factors were qualitatively processed by using interpretative structural model(ISM)method, and a multilevel stratum structure model for influential factors of implementing ERP was established. Through the model, the critical factors that influence ERP implementation in enterprises can be found. This will have great theoretic and realistic significance on designing effective management system of ERP implementation in enterprises.

  16. Are Urban Stream Restoration Plans Worth Implementing?

    Science.gov (United States)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  17. Are Urban Stream Restoration Plans Worth Implementing?

    Science.gov (United States)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  18. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  19. Tank farms justification for continued operations 007 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  20. Efficient Implementation of the Plan Graph in STAN

    CERN Document Server

    Fox, M; 10.1613/jair.570

    2011-01-01

    STAN is a Graphplan-based planner, so-called because it uses a variety of STate ANalysis techniques to enhance its performance. STAN competed in the AIPS-98 planning competition where it compared well with the other competitors in terms of speed, finding solutions fastest to many of the problems posed. Although the domain analysis techniques STAN exploits are an important factor in its overall performance, we believe that the speed at which STAN solved the competition problems is largely due to the implementation of its plan graph. The implementation is based on two insights: that many of the graph construction operations can be implemented as bit-level logical operations on bit vectors, and that the graph should not be explicitly constructed beyond the fix point. This paper describes the implementation of STAN's plan graph and provides experimental results which demonstrate the circumstances under which advantages can be obtained from using this implementation.

  1. Fifty years of fiscal planning and implementation in the Netherlands

    NARCIS (Netherlands)

    Beetsma, R.; Giuliodori, M.; Walschot, M.; Wierts, P.

    2012-01-01

    Using real-time data from the annual budgets over the period 1958-2009, we explore budgetary planning and implementation in the Netherlands. Three fiscal policy regimes are distinguished. Our key findings are the following. First, plans are on average unbiased, although they are overoptimistic durin

  2. Fifty years of fiscal planning and implementation in the Netherlands

    NARCIS (Netherlands)

    Beetsma, R.; Giuliodori, M.; Walschot, M.; Wierts, P.

    2013-01-01

    Using real-time data from the annual budgets over the period 1958-2009, we explore budgetary planning and implementation in the Netherlands. Three fiscal policy regimes are distinguished. Our key findings are the following. First, plans are on average unbiased, although they are overoptimistic durin

  3. Factors Influencing Marketing Planning And Implementation In Zimbabwean SMEs

    OpenAIRE

    Tongesai Mpofu; Shylet Chigwendeb

    2013-01-01

    The study is on factors affecting the extent of use of marketing plans, the impediments that affect the performance of SMEs. The background to the study is that most SMEs are not involved in marketing planning and implementation. The study is important because SMEs despite their contribution to the economy have not been given attention as the research of marketing planning and performance has been biased towards large enterprises. The major findings of the study are that these SMEs lack of sk...

  4. 77 FR 12651 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Science.gov (United States)

    2012-03-01

    ... (CARB) State Strategy for California's 2007 State Implementation Plan (2007 State Strategy).\\2\\ \\2... and on June 14, 2007 by CARB, submitted on November 16, 2007. 2. CARB, Proposed State Strategy for California's 2007 State Implementation Plan, amended and adopted on September 27, 2007 by CARB, submitted on...

  5. Factors Influencing Marketing Planning And Implementation In Zimbabwean SMEs

    Directory of Open Access Journals (Sweden)

    Tongesai Mpofu

    2013-04-01

    Full Text Available The study is on factors affecting the extent of use of marketing plans, the impediments that affect the performance of SMEs. The background to the study is that most SMEs are not involved in marketing planning and implementation. The study is important because SMEs despite their contribution to the economy have not been given attention as the research of marketing planning and performance has been biased towards large enterprises. The major findings of the study are that these SMEs lack of skilled human resources contributes to poor formulation and implementation of marketing plans for SMEs in Zimbabwe. The other findings were that poor management skills as human resources, financial management, general management and marketing results in poor implementation and performance of SMES in the sector on terms of profitability. Data was collected through secondary sources and observation of the marketing planning activities of the SMES. The results indicate that SMES in the sector do not have marketing plans and the few that have them do not implement them hence these organizations are run on trial and error strategies. The managerial aspects which are in short supply have negative effects on the planning and performance of SMEs in the sector. The results also indicate the past economic recession characterized by economic factors such as foreign exchange shortages, high interest rates affected their planning and performance negatively. The study recommends that Universities should hold workshops for these SMEs so that they are educated on marketing planning and implementation take measures so that they become aware of these concepts. Lastly, the study recommends the Ministry of SMEs, and other support institutions such as Empretec, SEDCO, and Banks take measures to ensure the survival, growth and development of this sector which has potential to steer the economy. These measures are expected to improve the managerial skills in SMEs and consequently

  6. ARM Unmanned Aerial Systems Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schmid, Beat [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ivey, Mark [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-11-01

    Recent advances in Unmanned Aerial Systems (UAS) coupled with changes in the regulatory environment for operations of UAS in the National Airspace increase the potential value of UAS to the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility. UAS include unmanned aerial vehicles (UAV) and tethered balloon systems (TBS). The roles UAVs and TBSs could play within the ARM Facility, particularly science questions they could help address, have been discussed in several workshops, reports, and vision documents, including: This document describes the implementation of a robust and vigorous program for use of UAV and TBS for the science missions ARM supports.

  7. Achieving succession planning and implementation: one healthcare network's story.

    Science.gov (United States)

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  8. 75 FR 45483 - Approval and Promulgation of Implementation Plans; Implementation Plan Revision; State of New Jersey

    Science.gov (United States)

    2010-08-03

    ... act on the phased compliance plans by repowering and innovative control in sections 19.21 and 19.23... compliance plan through repowering in Sec. from Oxides of Nitrogen.'' Register page Sec. 19.21 that...

  9. Implementation plan for Bolivian Mineral Exploration Fund

    Science.gov (United States)

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  10. Wisconsin Energy Extension Service implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-09

    As part of an effort to lower energy consumption levels among individuals and small establishments that use energy, The Energy Extension Service, operating in ten pilot states, has implemented programs which focus on the particular needs of small businesses. These programs have been developed to deliver a range of services to the many different kinds of enterprises which fit into the small business category. The programs currently operating in the ten pilot states are described and examples are given. In Alabama, Auburn University provides information and analyses to test the feasibility of using alternative fuels for small businesses. In Connecticut, the Department of Commerce provides audits to businesses throughout the State. In Michigan, the Department of Commerce, through two contractors, provides seminars to one tenth of the small businesses in southeastern Michigan. In New Mexico, the small business program provides demonstration audits of small businesses using alternative energy sources. In Pennsylvania, EES, in connection with the Pennsylvania State University, provides technical assistance to small businesses throughout the State. In Tennessee, the program provides audits, seminars, and counseling services to small businesses in three of that state's counties. In Texas, the Texas A and M College of Engineering operates an information retrieval system for small manufacturers through a bi-monthly bulletin. In Seattle, Washington, the small business program provides audits to Mom and Pop type businesses in two of that city's neighborhoods. In Wisconsin, the University of Wisconsin provides seminars and audits to hospitality industry businesses. In Wyoming, the small business program provides seminars to firms in the building industry.

  11. Update of the used fuel disposition Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Birkholzer, Jens [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); MacKinnon, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McMahon, Kevin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  12. Update of the Used Fuel Dispositon Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, Kevin A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mackinnon, Robert James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  13. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  14. Planning, implementing, and using a virtual reference service.

    Science.gov (United States)

    MacDonald, Marlyse H

    2003-01-01

    Virtual reference (VR) can be a successful vehicle for libraries if there is a demonstrated need by the user base for such a service and if the library staff believes in, accepts, and plans thoroughly for the concept. This article focuses on the experiences of the Duke University Medical Center Library (DUMCL) in planning, implementing, and using a virtual reference service utilizing LSSI's Virtual Reference Desk (VRD) Software.

  15. Enterprise Resource Planning Implementation in Small and Medium Enterprises

    Directory of Open Access Journals (Sweden)

    M. S.Tufail

    2012-08-01

    Full Text Available To improve productivity and overall performance, Enterprise Resource Planning (ERP is one of the solutions for the Small and Medium Enterprises (SMEs in order to face the global challenges. Though ERP systems, which evolved from Manufacturing Resource Planning (MRP II systems, have many advantages, there are some failure stories also. The successful implementation of ERP systems is a challenging task. Evidence shows that the number of failing ERP projects is increasing. This means that a model is necessary to help companies avoid previous mistakes and provide them with understanding of how ERP implementation can be effectively carried out and what its essential success components are. This paper review the several issues that one has to contend with when implementing an ERP system in the SME segment like awareness, perception, earlier implementation, cost change management, HRP, and top management commitment etc.

  16. Impact analysis of enterprise resource planning post-implementation modifications

    OpenAIRE

    Parhizkar, M

    2016-01-01

    Enterprise Resource Planning (ERP) as business system integration evolves in the post-implementation phase due to the change in business requirements caused by competitive environments. Uncontrolled or poorly managed changes may lead to low quality, chaotic systems and data that are difficult to use and maintain. Constructivist approaches to effectively manage post-implementation change in ERP systems from the design-related standpoint are currently lacking. Research in this field mostly focu...

  17. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  18. 75 FR 45080 - Revisions to the California State Implementation Plan

    Science.gov (United States)

    2010-08-02

    ... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) emissions from boilers, steam... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June... from boilers, steam generators, process heaters and water heaters with a total rated heat input...

  19. 2016-2020 Strategic Plan and Implementing Framework

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  20. Planning and Implementing an Integrated Document Management System.

    Science.gov (United States)

    Hendley, Tony

    1995-01-01

    Discusses points to consider when planning and implementing an integrated document management system: (1) background; (2) scoping the project; (3) strategic issues; (4) options review; (5) functional requirements; (6) technical requirements; (7) cost benefit analysis; (8) standard operational requirement checklist; (9) evaluation criteria; and…

  1. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION...

  2. Current Strategic Business Plan for the Implementation of Digital Systems.

    Science.gov (United States)

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  3. Implementation plan for HANDI 2000 TWRS master equipment list

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  4. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  5. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  6. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  7. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  8. Papo D’Anjo - International strategic implementation plan to Brazil

    OpenAIRE

    Pipa, Tomás Manuel Macedo Lousada Loureiro

    2011-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The objective of my work is to help a Portuguese company, Papo D'Anjo, to achieve its strategic goals by elaborating an International Strategic Implementation Plan to enter into Brazil. In order to succeed in this Strategic Plan I have studied the history of the company, the way it is organized, it production process, its revenues and mar...

  9. Standard Review Plan Maintenance Program implementing procedures document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections.

  10. 75 FR 56923 - Approval and Promulgation of Implementation Plans; Oklahoma; State Implementation Plan Revisions...

    Science.gov (United States)

    2010-09-17

    ... appropriate, disproportionate human health or environmental effects, using practicable and legally permissible... in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations... hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue,...

  11. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  12. 76 FR 77178 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Science.gov (United States)

    2011-12-12

    ... source categories and estimated emission reduction benefits from implementing these model rules. These... for heatset web, sheet-fed and cold-set offset lithographic printing processes. Subsection 234.3(c... limits for inks, coatings and adhesives (minus water). Section 234.6 requires best management practices...

  13. Project Planning, Implementation and Monitoring Issues, Findings and Recommendations

    Directory of Open Access Journals (Sweden)

    Muhammad Salim Javed

    2012-08-01

    Full Text Available The Higher Education Commission (HEC, Pakistan is one of the prestigious institutions of Government of Pakistan. It sets educational policies for all public and private sector universities of Pakistan. The objective of this study is to find institutional problems and issues of a project planning, implementation and monitoring issues. For this purpose, projects data were collected from Project Directors, HEC personnel's and consultants. Data were collected from 150 public and private sector universities and higher learning institution in the regions of Pakistan (i.e., Khyber Pakhtoon Khwa, Punjab, Sindh, Balochistan and Azad Jamu Kashmir using questionnaires. To provide the data, respondents were given the choice of being interviewed or self-administer the questionnaire and send them back to the researcher. After studying and analyzing the data, main problem and issues in project planning, implementation and monitoring issues were identified. In the view of these responses, rPecommendation had been concluded.

  14. Total Quality Management Implementation Plan: Defense Depot, Ogden

    Science.gov (United States)

    1989-07-01

    NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM ( Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General

  15. DLA-X Total Quality Management (TQM) Implementation Plan

    Science.gov (United States)

    1989-07-01

    PAGES TOM ( Total Quality Management ), Continuous Process Improvement.( .) 4L-- Administration 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr.-cr,bed by ANSI Std ,,fl.f 296-102 DLA-X TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN o...application of proven Total Quality Management techniques. Quality Policy: Responsibility for quality is delegated to every employee ;11 DLA-X. Every

  16. Total Quality Management Implementation Plan for Military Personnel Management

    Science.gov (United States)

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  17. Tourism stakeholder perspectives on land use plan implementation

    OpenAIRE

    2005-01-01

    This paper examines the degree to which shared decision-making (SDM) processes used in the development and implementation of land use plans benefited the backcountry tourism industry in the Cariboo-Chilcotin region of British Columbia. Based on the perspectives provided by key informants from the region, the research suggests that the employment of SDM methods provided several overriding opportunities for the tourism industry. These included creating easier and more effective venues for resol...

  18. The Implementation of Strategic Planning in Irish Hotel Groups.

    OpenAIRE

    2001-01-01

    The primary objective of this research was to examine the relative importance and success of forty factors over the past five years (1994-1999) that have facilitated and/or impeded the implementation of strategic plans within Irish hotel groups. This research studied twenty-four hotel groups, which consisted of ninety-five strategic business units. An extensive review of strategic management literature by theorists such as Andrews(1971); Ansoff (1990); Chandler (1962); Cole (1997); Day (1984)...

  19. A personalized care plan in chronic care: implementation and evaluation

    Science.gov (United States)

    Engels, Jeanny; Rebel, Marjolein; Boshuizen, Doortje

    2012-01-01

    Purpose Implementation and evaluation of a personalized care plan for approximately 350 people with (an increased risk of) cardiovascular disease in ten general practices in the Netherlands. Context The ‘Healthy Vessels’ (‘Vitale Vaten’) care standard of 2009 describes the optimum care for people with (an increased risk of) cardiovascular disease and is based on the Chronic Care Model. New: working with a personalized care plan, with detailed attention for the promotion of self-management and shared decision-making (SDM). This requires patients to adopt a more active attitude, with a more coaching role from care providers. Vilans has developed the personalized care plan for cardiovascular disease (the booklet ‘Zorgplan Vitale Vaten’) and the personalized care plan for diabetes and for COPD in 2011. In 2011 Vilans also started with the development of a general care plan for patients with multi morbidity diseases. Data sources Patients: quantitative survey with a written questionnaire sent to approximately 75 patients. Baseline and end points for 40 patients, plus in-depth interviews with eight patients. Care providers Quantitative survey with a written questionnaire sent to 45 care providers. Baseline and end points for 22 care providers, plus in-depth interviews with 10 care providers. Case description The personalized care plan is produced by a shared decision-making process and consists of: A prioritised list of the patient’s SMART objectives A personalized plan for achieving those objectives Agreements concerning what the patient will do himself/herself and the support or advice needed Agreements concerning contact to review the progress (how and when) The patient or the care provider notes the plan in the patient’s booklet (the ‘Zorgplan Vitale Vaten’=‘Healthy Vessels Care Plan’). This booklet also contains information about the risk factors for cardiovascular disease, the importance of the patient adopting an active role, measurement

  20. Recommendation 93-5 implementation plan, May 1996

    Energy Technology Data Exchange (ETDEWEB)

    Pennington, L.D., Westinghouse Hanford

    1996-05-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board transmitted Recommendation 93-5 on the Hanford Waste Tank Characterization Studies to the Department of Energy. The recommendation was accepted on September 9, 1993. Recommendation 93-5 noted that there was insufficient tank waste technical information to ensure that Hanford Site wastes could be safely stored, that associated operations could be conducted safely, and that future disposal data requirements could be met. As a result the Board recommended that the characterization effort be upgraded and expedited. The original Implementation Plan was accepted by the Board in March 1994. This Implementation Plan revision presents a modified approach to achieve the original Implementation Plan objectives. The approach concentrates on actions necessary to ensure that wastes can be safely stored, that operations can be safely conducted, and that timely characterization information for the tank waste Disposal Program can be obtained. Since Recommendation 93-5 was issued, significant progress has been achieved in understanding tank safety- related phenomena, resolving tank safety issues, and enhancing the capability and efficiency of tank characterization. Reviewing this progress led to the realization that tank safety issues could not be resolved solely by accelerating sampling and analysis to improve the characterization of tank contents. The key to expediting resolution was to better understand safety-related phenomena that cause the safety issues. A revised characterization and safety strategy evolved. The characterization and safety strategy presented in this Implementation Plan revision builds on the improved understanding and significant progress made to date. The revision is multifaceted and consists of the key elements listed: (1) Maintain tanks in an interim configuration using safety controls and, where necessary, mitigative actions. (2) Upgrade and complete the Authorization Basis for the Tank Farms

  1. Implementation Issues on Planning Control According to the Provisions of Town and Country Planning Act 1976 in Malaysia

    OpenAIRE

    Deguchi, Atsushi

    2008-01-01

    Planning control, as provided under Town and Country Planning Act 1976 (Act 172), is an essential feature in Malaysian urban planning system. However, planning control implementation in Malaysia has been challenged by the issue of non-compliance with the Act. This paper focuses on two key non-compliance issues; plarming not conforming to local plan, and development without or contratry to planning permission and constraint faced by planning authority to handle this situation. Through the stud...

  2. 78 FR 57573 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Attainment Plan for the...

    Science.gov (United States)

    2013-09-19

    ... expeditiously as practicable in a given area.\\21\\ Thus, assuming no presumptions under 40 CFR 51.1002, a state... in a given nonattainment area.\\35\\ \\34\\ See 40 CFR 51.1008. \\35\\ See 2007 PM 2.5 Implementation Rule... Plan for the Philadelphia-Wilmington, Pennsylvania-New Jersey-Delaware Nonattainment Area for the...

  3. 77 FR 74355 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Science.gov (United States)

    2012-12-14

    ... CARB's commitment to update the air quality modeling in the San Joaquin Valley 8-Hour Ozone SIP to... whichever comes first, as provided on page 3 of CARB Resolution No. 11-22 (dated July 21, 2011). CARB Resolution 11-22 documents CARB's adoption of the 8-Hour Ozone State Implementation Plan Revisions and...

  4. Self-assessment program implementation plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  5. 77 FR 35285 - Approval of Air Quality Implementation Plan; Arizona; Attainment Plan for 1997 8-Hour Ozone Standard

    Science.gov (United States)

    2012-06-13

    ... AGENCY 40 CFR 52 Approval of Air Quality Implementation Plan; Arizona; Attainment Plan for 1997 8-Hour... approving a state implementation plan (SIP) revision submitted by the State of Arizona on June 13, 2007, to demonstrate attainment of the 1997 8-hour ozone national ambient air quality standards (NAAQS) in the Phoenix...

  6. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Science.gov (United States)

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light...

  7. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Science.gov (United States)

    2010-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10050 Federally... part of the implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians: (a...

  8. 75 FR 45082 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2010-08-02

    ... Air Pollution Control District (SBCAPCD) portion of the California State Implementation Plan (SIP... Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  9. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental...

  10. [Implementation and expansion of family planning services: questions and controversies].

    Science.gov (United States)

    Canesqui, A M

    1985-01-01

    Even though the Brazilian government's position on birth control in the last few years has been ambiguous, it is moving away from the pro-life attitude that was prevalent in the 1960s and through the mid-1970s. The economic conditions during this period created a sense of urgency in establishing family planning programs to divert possible economic and social repercussions. The creation and expansion of family planning services in the last 2 decades have improved the distribution of contraceptives, related health care, and research. The problems of birth control and family planning are the same in Brazil as in the rest of the world. There is and always will be a moral, ethical, religious, or political question from the groups that traditionally oppose these concepts. The theme of responsible birth control is 1 of the tools used in the attempt to get the message across. Some results of irresponsible birth control are abortions, poverty, and misery. Proposals for integrating the various family planning services have not been implemented due to a lack of priorities in spending the available funds. Most of these health groups place responsibility for providing these methods of family planning upon the State. The groups say the State needs to consider women's freedom, sexuality and personal preferences in providing the family planning programs. A few groups prefer private sector sponsorship in order to preserve the woman's options concerning health care. The need for health care and the question of democracy both need to be taken into consideration when dealing with human reproduction. Attention should also be paid to the quality of health service, in order to guarantee less distortion of the issue and provide better medical care for all.

  11. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  12. The economic impact of implementing an ergonomic plan.

    Science.gov (United States)

    Morgan, Amanda; Chow, Susanna

    2007-01-01

    It is of paramount importance for executives to be well aware of registered nurse (RN) hidden replacement costs related to musculoskeletal injuries. Developing and implementing an ergonomic plan that includes procurement of appropriate lifting equipment at the point of care makes sense. Armed with an ergonomic plan, proactive case management, and a return to work program, the organization is positioned for fiscal success. The ANA's Handle With Care campaign addressed the fact that 12% of RN turnover and 38% of RN workers' compensation pay are related to back strains. Using the benchmarks reported in the Handle With Care campaign, the average cost of replacing an RN who leaves nursing due to a back injury ranged from $25,450 to $38,280 per nurse. Health care worker injury prevention should be valued as a retention strategy, as well as a fiscal responsibility where all stakeholders benefit.

  13. Planning and implementation of a student-led immunization clinic.

    Science.gov (United States)

    Dang, Christina J; Dudley, Janet E; Truong, Hoai-An; Boyle, Cynthia J; Layson-Wolf, Cherokee

    2012-06-18

    Students and faculty planned and implemented a pharmacist-led influenza clinic on election day. A needs assessment was conducted, and a core team was convened for planning and reaching out to health departments. Stakeholders helped to identify polling sites and obtain sponsorship for vaccinations. Standing orders and a protocol were considered and university legal counsel addressed potential liability issues. Volunteers were trained, and the event was promoted through media outlets. This pharmacist-led immunization clinic provided 153 vaccinations; 42 individuals received an influenza vaccination for the first time. Over 30 students and faculty members were involved in the clinic. Lessons learned, including challenges, opportunities, and practical recommendations, are provided for students and faculty pharmacists who wish to conduct similar programs.

  14. Total Quality Management Implementation Plan: DLA-N

    Science.gov (United States)

    1989-07-01

    e Wastimto , n. Othe 20 Seato3 4. TITLE AND SUBTITLE S. FUNDING NUMBERS DLA-N Total Quality Management 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S...PAGES TQM ( Total Quality Management ), Continuous Process Improvement.(; , Defense National Stockpile 16. PRICE CODEI17. SECURITY CLASSIFICATION 18...IUNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) pr"!Cbed ty ANSI Std Z39’B6 296-102 DLA - N TOTAL QUALITY MANAGEMENT IMPLEMENTATION PLAN I

  15. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    Science.gov (United States)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  16. Implementation plan for the Operations Center Upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed.

  17. Researching on quantitative project management plan and implementation method

    Science.gov (United States)

    Wang, Xin; Ren, Aihua; Liu, Xiangshang

    2017-08-01

    With the practice of high maturity process improvement, more and more attention has been paid to CMMI and other process improvement frameworks. The key to improve the process of high maturity is to quantify the process. At present, the method of improving the software process of high maturity is lack of specific introduction to the corresponding improvement link or process implementation. In this paper, based on the current improvement in the quantitative management of the framework and statistical analysis technical of the high maturity recommended for the enterprise to improve the process of planning and implementation methods. These methods provide quantitative process management for the enterprise, as well as quantitative management of the project to provide a systematic process, and finally evaluate the effectiveness of quantitative management projects. Finally, this method is used to verify the effectiveness of the framework in guiding the enterprise to improve the process of high maturity.

  18. 77 FR 35870 - Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of “Infrastructure...

    Science.gov (United States)

    2012-06-15

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of ``Infrastructure'' State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...'' State Implementation Plan (SIP). Specifically, we are finalizing the disapproval of portions of WDNR's...

  19. A strategic approach for Water Safety Plans implementation in Portugal.

    Science.gov (United States)

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. Partnerships for Policy Development: A Case Study From Uganda's Costed Implementation Plan for Family Planning.

    Science.gov (United States)

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-06-20

    In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda's CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda's CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda's CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution.

  2. Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    B. E. Olaveson

    2006-07-27

    The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

  3. Implementation Plan for a Common Nordic Retail Market

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    For several years NordREG has been working to promote and facilitate a common Nordic end user market. Given the political support that was expressed at the meeting of the Nordic energy ministers in the autumn of 2009, the work has become even more concrete. With this implementation plan, NordREG outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. As the plan shows the need for contributed efforts from all stakeholders will be vital in the coming years in order to make a reality of the plans of creating a common Nordic end user market. The transition from national retail markets to a single Nordic market will take a great deal of work from regulators, DSOs, suppliers and TSOs. The benefits that a single Nordic end user market will bring will however make it worthwhile. In the long run, the integrated Nordic end user market will be a more efficient solution than keeping the four national markets. This is also a step towards the integration of European markets. The process of creating a single Nordic market also brings a unique opportunity to find new efficient solutions on different issues. Hence, the goal is not only to integrate the Nordic end user markets, but rather to develop a more customer oriented market with a high degree of competition between the suppliers

  4. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Science.gov (United States)

    2011-03-09

    ... QUALITY Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive... (CEQ) is issuing instructions to Federal agencies for integrating climate change adaptation into agency... instructions to implement the Executive Order. The Instructions for Implementing Climate Change...

  5. Small Island Tourism Development Plan Implementation: The Case of Koh Tao, Thailand

    Directory of Open Access Journals (Sweden)

    Brian W. Szuster

    2014-06-01

    Full Text Available This article examines the implementation of tourism development plans in Thailand, focusing on the island of Koh Tao as a case study. It examines the applicability of plan implementation theory and explores context-specific factors that affect the success of the tourism development planning process. The research describes the history of land use planning on Koh Tao, evaluates the success of plan implementation, and identifies factors affecting planning outcomes. A key finding of this research is that a more sophisticated understanding of local context could provide opportunities for improved planning outcomes in island communities facing rapid tourism-related development.

  6. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Heinemann, J.L.

    1997-08-13

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP.

  7. Planning with Citizens: Implementation of an e-Planning Platform and Analysis of Research Needs

    Directory of Open Access Journals (Sweden)

    Stefan Steiniger

    2016-06-01

    Full Text Available Citizen participation should be an essential part of an urban planning process if the needs of the local population are to be addressed. Citizen participation should also improve acceptance of private construction projects by residents that live in or near such development. A complementary form of citizen participation to public planning meetings is to permit citizen engagement via Web 2.0 technologies, which also has the potential to get citizens involved that are usually difficult to reach. We aim to build a social, i.e. participatory, planning platform that allows technology savvy citizens to inform themselves of future and ongoing development projects and to also discuss them online. In this work we discuss the functional needs and context-of-use constraints of such an e-planning platform. A conceptual model of the technical architecture is outlined and a prototype implementation is presented. This prototype is built on free and open source software components, including a social network, to enable platform adoption in other locations. Finally, we discuss the research needs that are to be addressed if the development of participatory e-planning platforms should advance.

  8. Implementing the retrofitting plan for the European rail freight fleet

    Science.gov (United States)

    de Vos, P. H.; Bergendorff, M.; Brennan, M.; van der Zijpp, F.

    2006-06-01

    In 1998, the International Union of Railways (UIC) agreed on an Action Plan, proposing the retrofitting of the complete European rail freight fleet. Early 2003 the European Commission, Directorate General for Transport and Energy, commissioned the study reported here. The scope of the study was to supply an independent assessment of the conclusions of the UIC Action Plan and elaborate on implementation scenarios and funding options. The retrofitting of existing wagons, by an exchange of cast iron brake blocks with composition blocks, is the preferred option to achieve a substantial noise reduction. K-blocks have been homologated by UIC in 2003, but they require an expensive modification of the wagon. The opportunities for LL-blocks, an economically attractive alternative, are still being investigated to date. The retrofitting reflects some 600,000 wagons and, with an expected reduction of 10 dB(A), probably represents the largest single operation for traffic noise reduction ever. The process could best be combined with the maintenance cycle of freight wagons. In that case the process would require up to 10 years. Through a combination of funding options, the financial burden for wagons owners and freight operators could be softened.

  9. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  10. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  11. Do you have a voting plan?: implementation intentions, voter turnout, and organic plan making.

    Science.gov (United States)

    Nickerson, David W; Rogers, Todd

    2010-02-01

    Phone calls encouraging citizens to vote are staples of modern campaigns. Insights from psychological science can make these calls dramatically more potent while also generating opportunities to expand psychological theory. We present a field experiment conducted during the 2008 presidential election (N = 287,228) showing that facilitating the formation of a voting plan (i.e., implementation intentions) can increase turnout by 4.1 percentage points among those contacted, but a standard encouragement call and self-prediction have no significant impact. Among single-eligible-voter households, the formation of a voting plan increased turnout among persons contacted by 9.1 percentage points, whereas those in multiple-eligible-voter households were unaffected by all scripts. Some situational factors may organically facilitate implementation-intentions formation more readily than others; we present data suggesting that this could explain the differential treatment effect that we found. We discuss implications for psychological and political science, and public interventions involving implementation-intentions formation.

  12. Institutional Factors Of Implementation Planning And Planning Implementation%实施性规划与规划实施的制度要素

    Institute of Scientific and Technical Information of China (English)

    邹兵

    2015-01-01

    The paper analyzes the relation between implementation planning and planning implementation, and suggests implementation planning integrate spatial proposal and institutional design. Implementation environment includes subject, development model, land institution, and management system, and these factors decide the efficacy of planning implementation.%研究分析了实施性规划与规划实施的相互关系,以深圳实践为例,指出编制实施性规划要将空间方案与制度设计相结合,规划运行的外部环境应包括实施主体、开发模式、土地制度和管理体制等制度要素,其是决定规划实施成效的重要原因。

  13. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided you...

  14. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  15. 78 FR 28550 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... Porter Counties, Indiana, 1997 8-Hour Ozone Maintenance Plan and 1997 Annual Fine Particulate Matter... and Porter State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual...

  16. [Environmental Assessment for Implementation of a Light Goose Hunting Plan for Squaw Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The U.S. Fish and Wildlife Service is proposing to implement a light goose hunting plan on Squaw Creek National Wildlife Refuge. This plan discusses the following;...

  17. Information technology planning: critical for implementing advanced manufacturing automation

    Energy Technology Data Exchange (ETDEWEB)

    Devine, M.; Brogden, I. [EDS Canada Management Consulting Services, Whitby, ON (Canada)

    1994-12-31

    The paper describes the major components of information technology planning that, although developed for manufacturing companies, apply to mining companies. The major components of a fully integrated plan are discussed: strategic business planning, business process reengineering, corporate technology policy, application planning, information and data planning, infrastructure planning, and resource management. The factors that are critical to the success of information technology planning are discussed. Effective management for change must consider the following key components: corporate strategy, organizational structure, business process, people, culture, and technology. 12 refs., 5 figs., 1 tab.

  18. 77 FR 31499 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-05-29

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... clarity of the rules contained in the Commonwealth's Implementation Plan and Operating Permits Program...

  19. 77 FR 11974 - Approval and Promulgation of Implementation Plans; State of Iowa Regional Haze State...

    Science.gov (United States)

    2012-02-28

    ... revision. Processing of State Implementation Plan (SIP) Revisions, EPA Memorandum from John Calcagni...). Hercules Glades Wilderness Area, Missouri (HEGL). Mingo Wilderness Area, Missouri (MING). Caney...

  20. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  1. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Management District (SCAQMD or District) portion of the California State Implementation Plan (SIP... Air Quality Management District regarding specific implementation of parts of the Prevention of Significant Deterioration program. (i) Incorporation by reference. (A) South Coast Air Quality...

  2. 77 FR 2514 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Science.gov (United States)

    2012-01-18

    ... national economy, and are essential to public health and national security. The draft Implementation Plan... decision-making, and improved sharing of data and technology. For each action, the Implementation...

  3. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

  4. Implementation plan for WRAP Module 1 operational readiness review

    Energy Technology Data Exchange (ETDEWEB)

    Irons, L.G.

    1994-11-04

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

  5. Marketing: Realistic Tips for Planning and Implementation in Special Libraries.

    Science.gov (United States)

    Kassel, Amelia

    2002-01-01

    Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)

  6. Marketing: Realistic Tips for Planning and Implementation in Special Libraries.

    Science.gov (United States)

    Kassel, Amelia

    2002-01-01

    Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)

  7. EPOS Thematic Core Service Anthropogenic Hazards: Implementation Plan

    Science.gov (United States)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Grasso, Jean Robert; Schmittbuhl, Jean; Styles, Peter; Kwiatek, Grzegorz; Sterzel, Mariusz; Garcia, Alexander

    2015-04-01

    EPOS Thematic Core Service ANTHROPOGENIC HAZARDS (TCS AH) aims to integrate distributed research infrastructures (RI) to facilitate and stimulate research on anthropogenic hazards (AH) especially those associated with the exploration and exploitation of geo-resources. The innovative element is the uniqueness of the integrated RI which comprises two main deliverables: (1) Exceptional datasets, called "episodes", which comprehensively describe a geophysical process; induced or triggered by human technological activity, posing hazard for populations, infrastructure and the environment, (2) Problem-oriented, bespoke services uniquely designed for the discrimination and analysis of correlations between technology, geophysical response and resulting hazard. These objectives will be achieved through the Science-Industry Synergy (SIS) built by EPOS WG10, ensuring bi-directional information exchange, including unique and previously unavailable data furnished by industrial partners. The Episodes and services to be integrated have been selected using strict criteria during the EPOS PP. The data are related to a wide spectrum of inducing technologies, with seismic/aseismic deformation and production history as a minimum data set requirement and the quality of software services is confirmed and referenced in literature. Implementation of TCS AH is planned for four years and requires five major activities: (1) Strategic Activities and Governance: will define and establish the governance structure to ensure the long-term sustainability of these research infrastructures for data provision through EPOS. (2) Coordination and Interaction with the Community: will establish robust communication channels within the whole TCS AH community while supporting global EPOS communication strategy. (3) Interoperability with EPOS Integrated Core Service (ICS) and Testing Activities: will coordinate and ensure interoperability between the RIs and the ICS. Within this modality a functional e

  8. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  9. 78 FR 22840 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; State Board Requirements

    Science.gov (United States)

    2013-04-17

    ... requirements of the Clean Air Act (CAA) for all criteria pollutants of the national ambient air quality... Promulgation of Air Quality Implementation Plans; Delaware; State Board Requirements,'' that is located in the... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; State...

  10. 75 FR 18757 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Science.gov (United States)

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... approve as ] a revision to its State Implementation Plan (SIP) alternative monitoring requirements for...

  11. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the...

  12. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient... consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP)...

  13. 75 FR 82363 - Approval and Promulgation of Implementation Plans; Ohio; Volatile Organic Compound Emission...

    Science.gov (United States)

    2010-12-30

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Ohio; Volatile Organic Compound... printing volatile organic compound (VOC) rule for approval into the Ohio State Implementation Plan (SIP... mercury at 20 degrees Celsius. This rule also contains the appropriate test methods ] for determining...

  14. 76 FR 27622 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2011-05-12

    ... Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Large... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Large Appliance Coatings AGENCY: Environmental Protection Agency...

  15. 75 FR 55988 - Approval and Promulgation of Implementation Plans; Commonwealth of Kentucky; Prevention of...

    Science.gov (United States)

    2010-09-15

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Commonwealth of Kentucky... final action to approve a revision to the Commonwealth of Kentucky's State Implementation Plan (SIP.... Background On February 5, 2010, the Commonwealth of Kentucky, through KDAQ, submitted a revision to the...

  16. 77 FR 3691 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Virginia; Regional...

    Science.gov (United States)

    2012-01-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of... the Virginia State Implementation Plan (SIP) submitted by the Commonwealth of Virginia, through the... because of the deficiencies in the Commonwealth's regional haze SIP submittal arising from the remand by...

  17. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  18. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  19. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation advance planning document requirements (HIT IAPD). 495.338 Section 495.338 Public Health CENTERS FOR... the Medicaid Program § 495.338 Health information technology implementation advance planning...

  20. 77 FR 36442 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Science.gov (United States)

    2012-06-19

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD... approve revisions to the Prevention of Significant Deterioration (PSD) construction permit program of State of Michigan's State Implementation Plan (SIP) to meet the Clean Air Act (CAA) requirements for PSD...

  1. 75 FR 59084 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control Technique...

    Science.gov (United States)

    2010-09-27

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control...). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve a State Implementation Plan (SIP) revision submitted by the State of Maryland. This SIP revision pertains to the control...

  2. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Science.gov (United States)

    2013-07-08

    ... partially approving and partially disapproving Wyoming's 40 CFR 51.309(g) regional haze SIP. 78 FR 34738. In.... at both locations. The comment period for the proposed rule published June 10, 2013 at 78 FR 34738 is...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of...

  3. Implementation Intentions for Buying, Carrying, Discussing and Using Condoms: The Role of the Quality of Plans

    Science.gov (United States)

    de Vet, Emely; Gebhardt, Winifred Anne; Sinnige, Judith; Van Puffelen, Anne; Van Lettow, Britt; de Wit, John B. F.

    2011-01-01

    Forming implementation intentions (i.e. action plans that specify when, where and how a person will act) could be effective in promoting condom use on a large scale. However, the technique implies that people are able to form high quality implementation plans that are likely to induce behaviour change. Young single females, aged 16-30 years old,…

  4. 78 FR 30829 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Science.gov (United States)

    2013-05-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the Illinois State Implementation Plan (SIP) to reflect...

  5. 78 FR 28773 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2013-05-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption...: EPA is proposing to approve revisions to the Maryland State Implementation Plan (SIP) submitted by the... equipment, automotive or transportation equipment, interior or exterior automotive parts, construction...

  6. 78 FR 73188 - Adequacy Status of Motor Vehicle Emissions Budget in Submitted State Implementation Plan...

    Science.gov (United States)

    2013-12-05

    ... AGENCY Adequacy Status of Motor Vehicle Emissions Budget in Submitted State Implementation Plan; Maricopa... vehicle emissions budget (MVEB) for particulate matter less than ten microns (PM-10) for the year 2012 in... Environmental Quality (ADEQ) as a revision to the Arizona State Implementation Plan (SIP). As a result of...

  7. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  8. 40 CFR 52.1423 - PM10 State implementation plan development in group II areas.

    Science.gov (United States)

    2010-07-01

    ... development in group II areas. 52.1423 Section 52.1423 Protection of Environment ENVIRONMENTAL PROTECTION...) Nebraska § 52.1423 PM10 State implementation plan development in group II areas. The state of Nebraska... classified as Group II areas for the purpose of PM10 State Implementation Plan (SIP) development....

  9. 40 CFR 52.935 - PM10 State implementation plan development in group II areas.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false PM10 State implementation plan development in group II areas. 52.935 Section 52.935 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... State implementation plan development in group II areas. On July 7, 1988, the State submitted...

  10. 40 CFR 52.881 - PM10 State implementation plan development in group II areas.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false PM10 State implementation plan development in group II areas. 52.881 Section 52.881 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... State implementation plan development in group II areas. The state has submitted a committal SIP...

  11. 40 CFR 52.63 - PM10 State Implementation Plan development in group II areas.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false PM10 State Implementation Plan development in group II areas. 52.63 Section 52.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... State Implementation Plan development in group II areas. On March 15, 1989, the State submitted...

  12. 75 FR 48894 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to Emissions...

    Science.gov (United States)

    2010-08-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; New Mexico... Mexico State Implementation Plan (SIP). These revisions concern two separate actions. First, we are... pollutants such as ozone, particulate matter, and carbon monoxide. The revisions add new definitions,...

  13. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    Science.gov (United States)

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  14. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  15. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    Science.gov (United States)

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  16. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  17. Implementing and Sustaining Your Strategic Plan A Workbook for Public and Nonprofit Organizations

    CERN Document Server

    Bryson, John M; Alston, Farnum K

    2011-01-01

    Based on John Bryson's acclaimed comprehensive approach to strategic planning, the Implementing and Sustaining Your Strategic Plan workbook provides a step-by-step process, tools, techniques, and worksheets to help successfully implement, manage, and troubleshoot an organization's strategy over the long haul. This new and immensely practical workbook helps organizations work through the typical challenges of leading implementation for sustained change. It spotlights the importance of effective leadership for long-term successful strategic plan implementation. The authors include a wealth of to

  18. A Topological Implementation for Motion Planning of a Robotic Arm

    Institute of Scientific and Technical Information of China (English)

    李永成; 张Po

    1993-01-01

    An efficient path planning algorithm based on topologic method is presented in this paper.The collision free path planning for three-joint robotic arm consists of three parts:partition of C-space,construction of CN and search for a path in CN.We mainly solved the problems of partitioning the C-space and undging the connectivity between connected blocks,etc.For the motion planning of a robotic arm with a gripper,we developed the concepts of global planning and local planning,and discussed the basic factors for constructing the planning system.In the paper,some evaluation and analysis of the complexity and reliability of the algorithm are given,together with some ideas to improve the efficiency and increase the reliability.At last,some experimental results are pesented to show the efficency and accuracy of the algorithm.

  19. Numerous strategies but limited implementation guidance in US local adaptation plans

    Science.gov (United States)

    Woodruff, Sierra C.; Stults, Missy

    2016-08-01

    Adaptation planning offers a promising approach for identifying and devising solutions to address local climate change impacts. Yet there is little empirical understanding of the content and quality of these plans. We use content analysis to evaluate 44 local adaptation plans in the United States and multivariate regression to examine how plan quality varies across communities. We find that plans draw on multiple data sources to analyse future climate impacts and include a breadth of strategies. Most plans, however, fail to prioritize impacts and strategies or provide detailed implementation processes, raising concerns about whether adaptation plans will translate into on-the-ground reductions in vulnerability. Our analysis also finds that plans authored by the planning department and those that engaged elected officials in the planning process were of higher quality. The results provide important insights for practitioners, policymakers and scientists wanting to improve local climate adaptation planning and action.

  20. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans.

    Science.gov (United States)

    Dzierma, Yvonne; Nuesken, Frank; Licht, Norbert; Ruebe, Christian

    2013-08-03

    The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5% local dose and 3

  1. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  2. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Science.gov (United States)

    2010-09-03

    ...; Designation of Areas for Air Quality Planning Purposes; State of California; PM-10; Redesignation of the Coso Junction Planning Area to Attainment; Approval of PM-10 Maintenance Plan for the Coso Junction Planning... State of California's request to redesignate the Coso Junction planning area (CJPA) to attainment for...

  3. Fifty years of fiscal planning and implementation in the Netherlands

    NARCIS (Netherlands)

    Beetsma, R.; Giuliodori, M.; Walschot, M.; Wierts, P.

    2010-01-01

    Using real-time data from the annual budget over the period 1958-2009, we explore the planning and realization of fiscal policy in the Netherlands. Our key findings are the following. First, planned surpluses are on average unbiased, although they are overoptimistic during the first half of the samp

  4. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry...

  5. Critical Success Factors Aspects of the Enterprise Resource Planning Implementation

    Directory of Open Access Journals (Sweden)

    Milorad Nikitović

    2012-12-01

    Full Text Available Considering a global importance of small and medium sized enterprises (SMEs they are in the spotlight of ERP implementation retail stores. Many of the relevant studies indicate the importance and diversity of the ERP implementation process.  This paper presents results of the authors' research of the implementation success factors from the point of view of implementation participants. Based on the experience of a number of ERP implementations, authors compare the Croatian and international implementing practice of ERP solutions, taking into account the same critical success and the same ERP solution. Te emphasisis is put specifically on the three key participants in an implementation process: CEOs, project managers and successful-advanced users. Regardless of the relatively limited number of end users who took part in this study, it indicates a significant coincidence of Croatian and international practices in the part of perception of the critical success factors for ERP implementation, but also different views of key participants in the successful implementation.

  6. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  7. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  8. Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2015-01-01

    Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385

  9. Total Quality Management Implementation Plan Defense Depot Memphis

    Science.gov (United States)

    1989-07-01

    Total Quality Management Implementation...improvement goals, implementation strategy and milestones. 6’ SEP 291989 /; ELECTE i= E 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Depot...changing work environment where change is the norm. We are talking about changes in attitudes and habits. Total Quality Management is not a

  10. Streets Projecting in the Implementation Planning. Sustainability Perspectives in Landscape

    Directory of Open Access Journals (Sweden)

    Luigi Guastamacchia

    2014-12-01

    Full Text Available In the last years Puglia Region supported the theme of sustainability with programs and planning instruments and this led to think about the contemporary project at urban scale and about the order elements of all transformations: organizing solutions, building and aggregation types, halfpublic and public areas, streets. This work shows how the regional service of territorial structure tried to find a projecting system in terms of environement/ landscape sustainability to be proposed to the people engaged in the definition of all executive plans. This would ensure control and quality of the relationship between road pattern, open spaces and buildings.

  11. Language Planning and Implementation in Turkish Primary Schools

    Science.gov (United States)

    Kirkgoz, Yasemin

    2007-01-01

    This paper explores a major curriculum innovation in English language teaching in Turkish primary education from macro and micro perspectives. After an overview of the role of English in Turkey, macro-level planning underlying the introduction of English language teaching policy in state-owned primary education is presented. Then the diffusion of…

  12. Performance assessment implementation plan for the geologic repository program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-01-01

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs.

  13. Succession planning for RNs: implementing a nurse management internship.

    Science.gov (United States)

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  14. 76 FR 26679 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for...

    Science.gov (United States)

    2011-05-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for Preconstruction Review, Prevention of Significant Deterioration AGENCY: Environmental... Regulation 1125, Requirements for Preconstruction Review, Prevention of Significant Deterioration (PSD) found...

  15. 78 FR 26258 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Science.gov (United States)

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of direct final...

  16. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Science.gov (United States)

    2010-11-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final... standards for industrial solvent cleaning operations that satisfy the reasonably available...

  17. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality Management...

  18. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD or...

  19. 78 FR 19990 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2013-04-03

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards; Correction AGENCY: Environmental Protection Agency (EPA). ACTION: Final...

  20. 75 FR 59179 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2010-09-27

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Flexible Packaging Printing AGENCY: Environmental Protection... Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG) for...

  1. 75 FR 59086 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2010-09-27

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Flexible Packaging Printing AGENCY: Environmental Protection... Processes, and meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources...

  2. 77 FR 41954 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Science.gov (United States)

    2012-07-17

    ... submitted by the Indiana Department of Environmental Management on May 14, 2012, to revise the Indiana State Implementation Plan (SIP). The submission revises the Indiana Administrative Code (IAC) definition of...

  3. Implementation Plan for a Common Nordic Retail Market. Evaluation of the responses on the public consultation

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    Draft implementation plan for a common Nordic Retail Market was developed in close cooperation with relevant stakeholders in the Nordic electricity market during winter and spring 2010. The implementation plan outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. NordREG organised a public consultation on the draft implementation plan from the end of June until the beginning of the August, 2010 and received 25 responses from stakeholders. This evaluation report includes summary of stakeholders' responses and NordREG comments on stakeholders' views. The evaluation of the responses has been taken into account during the finalization of the implementation plan

  4. 76 FR 41745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-07-15

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Valley Unified Air Pollution Control District portion of the California State Implementation Plan (SIP... Valley Unified Air Pollution Control District (SJVUAPCD) Rule 4682, Polystyrene, Polyethylene, and...

  5. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2010-02-23

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). These... construction sites, unpaved roads, and disturbed soils in open and agricultural areas. We are proposing...

  6. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  7. 76 FR 71922 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality...

  8. 78 FR 34306 - Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques...

    Science.gov (United States)

    2013-06-07

    ... nonattainment area. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques Guidelines and Reasonably Available Control Technology AGENCY: Environmental...

  9. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  10. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP)....

  11. Implementing PlanCheyenne: Strategies and Opportunities for Smarter Growth in Cheyenne

    Science.gov (United States)

    This report is from a technical assistance project with Cheyenne, WY, to identify policy options that would implement PlanCheyenne and illustrate development that would help to achieve the community's goals.

  12. 77 FR 11958 - Approval and Promulgation of Air Quality Implementation Plans; State of Missouri; Regional Haze...

    Science.gov (United States)

    2012-02-28

    ... State Implementation Plan (SIP) Revisions, EPA Memorandum from John Calcagni, Director, Air Quality... Glades Wilderness Area and Mingo National Wildlife Refuge. Because both areas lie within Missouri's... at the Hercules Glades Wilderness area (Hercules Glades) using monitoring data from the...

  13. 75 FR 14401 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Science.gov (United States)

    2010-03-25

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD... significant deterioration (PSD) construction permit program in Michigan. As required by the conditional...

  14. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management...

  15. 76 FR 68698 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Science.gov (United States)

    2011-11-07

    ...- 9487-7] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen... Commonwealth of Virginia that revises regulatory language that inadvertently ended its nitrogen oxides (NO...

  16. 77 FR 21911 - Approval and Promulgation of Implementation Plans; State of Arizona; Prevention of Air Pollution...

    Science.gov (United States)

    2012-04-12

    ... Air Pollution Emergency Episodes AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... of Arizona to address the requirements regarding air pollution emergency episodes in Clean Air Act... air pollution emergency episodes and adequate contingency plans to implement such authority...

  17. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-06

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District... State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District's Rule 4352,...

  18. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  19. Implementation of ways to effectively integrate health into local environmental planning

    DEFF Research Database (Denmark)

    Jakobsen, Mette Winge

    2015-01-01

    -2013) included testing of the implementation models, capacity building and expert consultation. The intervention was evaluated in 2012 and 2014 in relation to the most effective mechanisms in relation use of HIA tools, sustainable procedures for integrating a health concern and ensuring HiAP. Evaluation results...... showed that HIA tools were integrated into the local planning process as proactive planning tools. Systematic procedures and cross-sectoral collaboration were key factors in integrating a health concern in environmental planning, strengthened by frequent, accurate and timely communication, personal...... relationship and common language for health relevant for environmental planning. Also, early involvement increased ownership. Simple tools, improving existing planning processes and creating common language for health were key learnings to ensure effective implementation of a health concern in a local planning...

  20. Precision Teaching Project: Implementation Handbook. The Sacajawea Plan.

    Science.gov (United States)

    Beck, Ray; And Others

    The implementation handbook provides information on screening, assessment, and remediation procedures utilizing the precision teaching method for children with learning deficits in both elementary and secondary schools. The first sections discuss the purpose, define terms, and specify materials needed. The section on classroom management includes…

  1. Carbon Offset Forestry: Forecasting Ecosystem Effects (COFFEE) Project Implementation Plan

    Science.gov (United States)

    COFFEE will evaluate the environmental impacts of implementing various COF practices by using the amount of total ecosystem C (TEC) sequestered in forests as the integrative response metric. These evaluations will be done for current-climate and future-climate scenarios and will...

  2. Carbon Offset Forestry: Forecasting Ecosystem Effects (COFFEE) Project Implementation Plan

    Science.gov (United States)

    COFFEE will evaluate the environmental impacts of implementing various COF practices by using the amount of total ecosystem C (TEC) sequestered in forests as the integrative response metric. These evaluations will be done for current-climate and future-climate scenarios and will...

  3. 76 FR 32113 - Revisions to the California State Implementation Plan

    Science.gov (United States)

    2011-06-03

    ... ``anonymous access'' system, and EPA will not know your identity or contact information unless you provide it... Board (CARB) Automotive Coatings Suggested Control Methods (SCM), to add prohibitions regarding sale and... Requirements for Implementing NESHAP, EPA-456/R-97-006 and CARB Automotive Coatings SCM. B. Do the rules...

  4. Implement balanced scorecard to translate strategic plan into actionable objectives.

    Science.gov (United States)

    2004-09-01

    Faced with challenges ranging from declining reimbursement to staff shortages, health care organizations--integrated delivery systems, physician group practices, disease management providers, and others--increasingly are turning to general business models to map out step-by-step action plans for performance measurement and process improvement. Creating a "balanced scorecard" is an obvious starting point for assessing and improving clinical and financial performance.

  5. 78 FR 6783 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Flint Hills Resources...

    Science.gov (United States)

    2013-01-31

    ... State Implementation Plan for Flint Hills Resources Pine Bend, LLC, in Dakota County. This oil refinery is shutting down an incinerator, rerouting process gases, planning for a new boiler, and making other emission limit reductions. This revision addresses an important safety issue with the current off-...

  6. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  7. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  8. 78 FR 28503 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... Porter Counties, Indiana, 1997 8-Hour Ozone Maintenance Plan and 1997 Annual Fine Particulate Matter... Porter Counties State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual... MOVES2010a-based budgets for the Lake and Porter County, Indiana 1997 8-hour ozone maintenance area and the...

  9. 76 FR 40624 - Approval and Promulgation of Implementation Plans; State of Kansas

    Science.gov (United States)

    2011-07-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Kansas AGENCY... Plan (SIP) submittal from the State of Kansas addressing the requirements of Clean Air Act (CAA or Act... Division, 901 North 5th Street, Kansas City, Kansas 66101. EPA requests that, if at all possible, you...

  10. 78 FR 6035 - Approval and Promulgation of Air Quality Implementation Plans; Ohio and Indiana; Cincinnati...

    Science.gov (United States)

    2013-01-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio and Indiana; Cincinnati-Hamilton, OH; Ohio and Indiana 1997 8-Hour Ozone Maintenance Plan Revisions to Approved Motor..., 2010 and 77 FR 11394, February 27, 2012). The Ohio, Kentucky, Indiana Regional Council of...

  11. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated lik

  12. Planning principles as integral tool of financial planning implementation at enterprise

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2016-09-01

    Full Text Available The main problems of using financial planning tools, namely its principles, in order to achieve an effective system of financial planning at the enterprise are considered. Planning is an integral part of management and provides achievement of sustainable enterprise development, that is why, effective financial planning is the necessary means of realization of the main objective of the company – profit maximization. It is determined that the principles of financial planning are the objective category of planning science, which serves as a starting fundamental concept that expresses the cumulative effect of a number of laws. In addition, on the base of the aggregation and analysis of planning principles the system of financial planning principles is specified, providing efficient financial planning and control functions use, achievement of the mission and objectives of the economic entity activity management and ensuring of its profitability. The scientific novelty of the research lies in the specification of financial planning principles defining at the enterprise and their semantic characteristics

  13. Planning to break habits : Efficacy, mechanisms, and boundary conditions of implementation intentions targeting unhealthy snacking habits

    NARCIS (Netherlands)

    Adriaanse, M.A.

    2010-01-01

    Having strong goal intentions is generally not sufficient to ensure actual goal-directed behavior. However, when goal intentions are furnished with a specific type of planning, called ‘implementation intentions’, the likelihood of successful goal-striving substantially increases. Implementation inte

  14. Exploring the Influence of New Technology Planning and Implementation on the Perceptions of New Technology Effectiveness

    Science.gov (United States)

    Bellamy, Al

    2007-01-01

    This study explored influences that perceptions of new technology implementation and planning processes, and dimensions of organizational climate have on perceptions of new technology deployment effectiveness. It also examined the extent to which dimensions of organizational climate moderates the relationships among new technology implementation,…

  15. PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

  16. 78 FR 49684 - Approval and Disapproval of Air Quality State Implementation Plans; Arizona; Regional Haze and...

    Science.gov (United States)

    2013-08-15

    ... INFORMATION: In Federal Register document 2013-18022 published in the Federal Register on July 30, 2013 (78 FR...; Regional Haze and Interstate Transport Requirements AGENCY: Environmental Protection Agency (EPA). ACTION... of Arizona's State Implementation Plan (SIP) to implement the regional haze program for the...

  17. Planning to break habits : Efficacy, mechanisms, and boundary conditions of implementation intentions targeting unhealthy snacking habits

    NARCIS (Netherlands)

    Adriaanse, M.A.

    2010-01-01

    Having strong goal intentions is generally not sufficient to ensure actual goal-directed behavior. However, when goal intentions are furnished with a specific type of planning, called ‘implementation intentions’, the likelihood of successful goal-striving substantially increases. Implementation

  18. Implementation of Planned Change: A Review of Major Issues.

    Science.gov (United States)

    1983-02-01

    15 3. Methods for Dealing with Resistance to Change . .. .. .. . .. . . . 21 4. Bases for the Selection of Implementation Strategies...phase of the innovation process has heretofore been relatively unexplored. Second, there has been an overemphasis on overcoming resistance to change to...exclusively in terms of resistance to change does not do justice to the complexity of organizational reality. Miller and Freisen (1980) propose an

  19. Beyond Planning: The Implementation of a Worksite Health Promotional Scheme

    Directory of Open Access Journals (Sweden)

    Thor Christian Bjørnstad

    2012-06-01

    Full Text Available The aim of this article is to provide insight into how the presence of diverging organizational logics influences the outcome of worksite health promotion projects. The study is based on a one-year qualitative single-case study of the implementation of a health promotional physical exercise program in a transnational transport and logistics company based in Norway. While the program that was implemented was based on dominant logics in Norway, i.e., the emphasis on worker participation and influence, the organizational logics of the transport company defined company–worker relationships in other terms. We found that the logic of a highly specialized work organization that combined strict work distribution with a set of narrowly defined work tasks contradicted the logic that underpinned the health promotional program, and that this contradiction is an important reason why the initiative failed. We therefore conclude that in implementing health promotion projects at the workplace, there is a need to observe the relationship between logics related both to the project and to the organization.

  20. Springfield/L-COG Energy Plan Implementation Program, Internal Energy Management Project: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lane Council of Governments (Or.); Tumidaj, Les

    1985-09-01

    The Internal Energy Management Project was developed as a component of the Springfield/L-COG Energy Plan Implementation Program. The project also took advantage of the ground work laid by the Lane Council of Governments through the Lane County Electric Energy Planning Program. This program, conducted in 1982 and 1983, developed detailed recommendations for Lane County cities concerning energy management and planning. Based on these recommendations, many jurisdictions committed themselves to implement energy management programs. Initially, the participating cities included Springfield, Veneta, Oakridge, Creswell, and Lowell. Two other local governments - Florence and Lane County - requested assistance once the project commenced.

  1. Internal marketing within a health care organization: developing an implementation plan.

    Science.gov (United States)

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  2. Framing the implementation process of video conferencing in discharge planning-According to staff experience.

    Science.gov (United States)

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-01-01

    Challenges of improving discharge planning have been an area of concern for many years, including problems related to the lack of time for professionals to participate. In a county in South East Sweden, video conferencing was implemented in discharge planning sessions to enable distance participation of the professionals. To examine the implementation process, interviews were conducted with the implementers, who were project leaders, discharge planning coordinators in the hospital, and in home-care. The interviews were analyzed qualitatively, using directed content analysis with a deductive approach to a theoretical framework that was composed from theories about implementation processes to be suitable for the healthcare sector, consisting of the factors: implementation objects; implementation actions; actors; users; inner context and outer context. The results of this study are consistent with the framework but with the addition of a new dimension-time, i.e. time to prepare; time to understand; time to run through and time to reflect. It is suggested that implementation frameworks are useful when IT is introduced in healthcare. Framing the implementation process supports the exposure of factors and highlights relationships and states of dependence between those factors which may affect implementation.

  3. A climate change plan for the purposes of the Kyoto Protocol Implementation Act

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-15

    In response to concerns about climate change, the Government of Canada is taking comprehensive actions to reduce Canada's greenhouse gas emissions. This document constituted the climate change plan for 2008 that the Canadian government was required to publish under section 5 of the Kyoto Protocol Implementation Act. The report provided background information on the Kyoto Protocol Implementation Act and outlined Canada's Kyoto Protocol targets and obligations. It also presented Canada's greenhouse gas emissions in 2006 and discussed the economics of the Kyoto Protocol Implementation Act. Actions to address climate change as well as provincial territorial collaboration and action were also outlined. Timelines for achievement of emissions targets were presented. It was concluded that with this document, the Minister of the Environment has responded to the publication requirements of section 5 of the Kyoto Protocol Implementation Act. The action plan was found to be a realistic, balanced and achievable plan. refs., tabs.

  4. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  5. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  6. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  7. 78 FR 20868 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Science.gov (United States)

    2013-04-08

    ... INFORMATION CONTACT: Wienke Tax, U.S. Environmental Protection Agency, Air Planning Office, Region IX, (415... Air Quality Planning Purposes; State of California; PM 10 ; Redesignation of the South Coast Air Basin.... Email: tax.wienke@epa.gov . 3. Mail or Deliver: Wienke Tax (Air-2), U.S. Environmental Protection Agency...

  8. Implementation of Logic Flow in Planning and Production Control

    Directory of Open Access Journals (Sweden)

    Ulewicz Robert

    2016-03-01

    Full Text Available The article presents the results of analysis, the use of continuous flow of logic at the stage of production planning and control of the company producing furniture. The concept of continuous flow tends to regulate the flow of materials in a manner that provides the shortest flow path without unnecessary activities (Muda is a Japanese word meaning waste, a constant takt and defined throughput at constant resource requirements for the so-called transfer of material through the whole process. In the study Glenday’d sieve method was used to identify the correct area, which requires the value stream mapping, and areas called excessive complexity, which do not provide added value. The use of Glenday’s sieve method made it possible to identify areas in which it must be improve production capacity.

  9. The implementation of electronic services: planned or organic growth?

    Directory of Open Access Journals (Sweden)

    John Cole

    2005-11-01

    Full Text Available The literature on innovation suggests that projects are successful when rigorous project management is mixed judiciously with 'organic' development. This paper argues that organic growth can play a substantial role in the implementation of electronic services in healthcare settings. Evidence for organic growth is presented, based on a study of email use. Methods are presented for investigating email use in health service settings in the National Health Service (NHS in Bradford, England. Geographical information systems (GIS outputs and social network analyses are presented. The results demonstrate a fivefold increase in the use of email over a 13-month period, which is shown to be largely independent of the growth in the number of organisations using the network. They also demonstrate a marked increase in the complexity of the patterns of email use over the period.

  10. Web survey data collection and retrieval to plan teleradiology implementation

    Science.gov (United States)

    Alaoui, Adil; Collmann, Jeff R.; Johnson, Jeffrey A.; Lindisch, David; Nguyen, Dan; Mun, Seong K.

    2003-05-01

    This case study details the experience of system engineers of the Imaging Science and Information Systems Center, Georgetown University Medical Center (ISIS) and radiologists from the department of Radiology in the implementation of a new Teleradiology system. The Teleradiology system enables radiologists to view medical images from remote sites under those circumstances where a resident radiologist needs assistance in evaluating the images after hours and during weekends; it also enables clinicians access to patients" medical images from different workstations within the hospital. The Implementation of the Teleradiology project was preceded by an evaluation phase to perform testing, gather users feedback using a web site and collect information that helped eliminate system bugs, complete recommendations regarding minimum hardware configuration and bandwidth and enhance system"s functions, this phase included a survey-based system assessment of computer configurations, Internet connections, problem identification, and recommendations for improvement, and a testing period with 2 radiologists and ISIS engineers; The second phase was designed to launch the system and make it available to all attending radiologists in the department. To accomplish the first phase of the project a web site was designed and ASP pages were created to enable users to securely logon and enter feedback and recommendations into an SQL database. This efficient, accurate data flow alleviated networking, software and hardware problems. Corrective recommendations were immediately forwarded to the software vendor. The vendor responded with software updates that better met the needs of the radiologists. The ISIS Center completed recommendations for minimum hardware and bandwidth requirements. This experience illustrates that the approach used in collecting the data and facilitating the teamwork between the system engineers and radiologists was instrumental in the project"s success. Major problems

  11. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  12. Water safety plans: bridges and barriers to implementation in North Carolina.

    Science.gov (United States)

    Amjad, Urooj Quezon; Luh, Jeanne; Baum, Rachel; Bartram, Jamie

    2016-10-01

    First developed by the World Health Organization, and now used in several countries, water safety plans (WSPs) are a multi-step, preventive process for managing drinking water hazards. While the beneficial impacts of WSPs have been documented in diverse countries, how to successfully implement WSPs in the United States remains a challenge. We examine the willingness and ability of water utility leaders to implement WSPs in the US state of North Carolina. Our findings show that water utilities have more of a reactive than preventive organizational culture, that implementation requires prioritization of time and resources, perceived comparative advantage to other hazard management plans, leadership in implementation, and identification of how WSPs can be embedded in existing work practices. Future research could focus on whether WSP implementation provides benefits such as decreases in operational costs, and improved organization of records and communication.

  13. Critical Success factors for Enterprise Resource Planning implementation in Indian Retail Industry: An Exploratory study

    CERN Document Server

    Garg, Poonam

    2010-01-01

    Enterprise resource Planning (ERP) has become a key business driver in today's world. Retailers are also trying to reap in the benefits of the ERP. In most large Indian Retail Industry ERP systems have replaced nonintegrated information systems with integrated and maintainable software. Retail ERP solution integrates demand and supply effectively to help improve bottom line. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures than successes. Very few implementation failures are recorded in the literature because few companies wish to publicize their implementation failure. This paper explores and validates the existing literature empirically to find out the critical success factors that lead to the success of ERP in context to Indian retail industry. The findings of the results provide valuable insights for the researchers and practitioners who are interested in implementing Enterprise Resource Planning systems in retail industry, how bes...

  14. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. &apos

  15. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  16. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  17. Using Implementation Planning to Increase Teachers' Adherence and Quality to Behavior Support Plans

    Science.gov (United States)

    Sanetti, Lisa M. Hagermoser; Collier-Meek, Melissa A.; Long, Anna C. J.; Kim, Jisun; Kratochwill, Thomas R.

    2014-01-01

    Evidence-based practices within a response-to-intervention framework must be implemented with adequate treatment integrity to promote student outcomes. However, research findings indicate educators struggle to implement interventions and logistical considerations may limit the utility of performance feedback, an evidence-based treatment integrity…

  18. 77 FR 21512 - Approval, Disapproval and Promulgation of Air Quality Implementation Plan; Utah; Maintenance Plan...

    Science.gov (United States)

    2012-04-10

    ... two NO X ACTs since we approved the maintenance plan in 1997--one for cement manufacturing and one for internal combustion engines--and we do not read those updates as being ``new determinations of...

  19. Looking to the future: Framing the implementation of interprofessional education and practice with scenario planning.

    Science.gov (United States)

    Forman, Dawn; Nicol, Pam; Nicol, Paul

    2015-01-01

    Adapting to interprofessional education and practice requires a change of perspective for many health professionals. We aimed to explore the potential of scenario planning to bridge the understanding gap and framing strategic planning for interprofessional education (IPE) and practice (IPP), as well as to implement innovative techniques and technology for large-group scenario planning. A full-day scenario planning workshop incorporating innovative methodology was designed and offered to participants. The 71 participants included academics from nine universities, as well as service providers, government, students and consumer organisations. The outcomes were evaluated by statistical and thematic analysis of a mixed method survey questionnaire. The scenario planning method resulted in a positive response as a means of collaboratively exploring current knowledge and broadening entrenched attitudes. It was perceived to be an effective instrument for framing strategy for the implementation of IPE/IPP, with 81 percent of respondents to a post-workshop survey indicating they would consider using scenario planning in their own organisations. The scenario planning method can be used by tertiary academic institutions as a strategy in developing, implementing and embedding IPE, and for the enculturation of IPP in practice settings.

  20. RELATIONSHIP BETWEEN ORGANIZATIONAL FACTORS, TECHNOLOGICAL FACTORS AND ENTERPRISE RESOURCE PLANNING SYSTEM IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Suha Afaneh

    2015-02-01

    Full Text Available There are three stages of Enterprise Resource planning System (ERP Implementation; which are preimplementation, mid- implementation and post-implementation. In pre-implementation stage the pervious researchers found that it fail in Organizational and Technological factors. Therefore, this research studies the Technological Factors availability and the Organizational Factor readiness at Greater Amman Municipality (GAM Case study. The statistical results showed that there are availability of the Organizational factor (Organizational Objectives and Services, Organization culture, and Business process for success of ERP system, and indicate the technological infrastructure is available og GAM

  1. 77 FR 24392 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Science.gov (United States)

    2012-04-24

    ... visibility improvement expected from the implementation of the Transport Rule and compared the results to the improvements expected from BART. On December 30, 2011 (76 FR 82219), EPA proposed its determination that the... industrial boilers (Industrial Boiler MACT), and the Transport Rule). The Commenter asserts that this...

  2. 77 FR 70689 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Science.gov (United States)

    2012-11-27

    ...., 1-hour SO 2 NAAQS, the maximum achievable control technology (MACT) rule for industrial boilers (Industrial Boiler MACT), and the Transport Rule). The Commenter asserts that this will provide Eastman with... implementing the regional haze program. In comparison, the Utility Boiler MACT and the Industrial Boiler...

  3. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  4. Stakeholders' Perception on National Heatwave Plans and Their Local Implementation in Belgium and The Netherlands.

    Science.gov (United States)

    van Loenhout, Joris Adriaan Frank; Rodriguez-Llanes, Jose Manuel; Guha-Sapir, Debarati

    2016-11-10

    National heatwave plans are aimed at reducing the avoidable human health consequences due to heatwaves, by providing warnings as well as improving communication between relevant stakeholders. The objective of this study was to assess the perceptions of key stakeholders within plans in Belgium and The Netherlands on their responsibilities, the partnerships, and the effectiveness of the local implementation in Brussels and Amsterdam. Key informant interviews were held with stakeholders that had an important role in development of the heatwave plan in these countries, or its implementation in Brussels or Amsterdam. Care organisations, including hospitals and elderly care organisations, had a lack of familiarity with the national heatwave plan in both cities, and prioritised heat the lowest. Some groups of individuals, specifically socially isolated individuals, are not sufficiently addressed by the current national heatwave plans and most local plans. Stakeholders reported that responsibilities were not clearly described and that the national plan does not describe tasks on a local level. We recommend to urgently increase awareness on the impact of heat on health among care organisations. More emphasis needs to be given to the variety of heat-risk groups. Stakeholders should be involved in the development of updates of the plans.

  5. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  6. A discharge planning program in orthopaedics: experiences in implementation and evaluation.

    Science.gov (United States)

    Matt-Hensrud, N; Severson, M; Hansen, D C; Holland, D E

    2001-01-01

    The acute care orthopaedic registered nurse plays a key role in assessing and communicating the continuing care needs of patient's and their families, coordinating community resources, and formulating a timely discharge plan to maximize rehabilitation and recovery. Developing and maintaining a staff nurse's discharge planning knowledge and skills can be a challenging endeavor. Discharge Planning Coordinators at a tertiary medical center developed and implemented a Discharge Planning Mentorship Program, an educational pilot program designed to enhance the knowledge and skill level of select nurses in the orthopaedic specialty practice, thus maximizing expert resources at the bedside. Program implementation and evaluation of role preparation, practice changes, and actualization challenges are discussed in this article. Overall, participants demonstrated increased skill in articulating and problem solving a patient's postdischarge needs, devised creative strategies to enhance communication between multiple levels of care, and developed a greater knowledge of community resources and reimbursement mechanisms for continuing care.

  7. An implementation plan for priorities in solar-system space physics

    Science.gov (United States)

    Krimigis, Stamatios M.; Athay, R. Grant; Baker, Daniel; Fisk, Lennard A.; Fredricks, Robert W.; Harvey, John W.; Jokipii, Jack R.; Kivelson, Margaret; Mendillo, Michael; Nagy, Andrew F.

    1985-01-01

    The scientific objectives and implementation plans and priorities of the Space Science Board in areas of solar physics, heliospheric physics, magnetospheric physics, upper atmosphere physics, solar-terrestrial coupling, and comparative planetary studies are discussed and recommended programs are summarized. Accomplishments of Skylab, Solar Maximum Mission, Nimbus-7, and 11 other programs are highlighted. Detailed mission plans in areas of solar and heliospheric physics, plasma physics, and upper atmospheric physics are also described.

  8. IMPLEMENTING FRANCHISING INTO A BUSINESS. : Based on my own business plan.

    OpenAIRE

    Krzyzaniak, Patryk

    2016-01-01

    The aim of the thesis is to successfully implement a business system based on franchising into the author's own business. The thesis will provide information about the actual busi-ness plan, theoretical and practical investigation on how franchising would efficiently work in the Finnish market, basic principles of cooperation on a franchise basis, categories of fran-chising (in general and in cooperation with the author's business plan), advantages and dis-advantages of having franchising as ...

  9. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    Energy Technology Data Exchange (ETDEWEB)

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  10. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  11. IMPLEMENTATION OF THE EU NOISE DIRECTIVE IN PROCESS OF URBAN PLANNING IN POLAND

    Directory of Open Access Journals (Sweden)

    J. Kwiecień

    2013-05-01

    The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.

  12. 76 FR 69927 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997...

    Science.gov (United States)

    2011-11-09

    ... never effectively plan for air quality improvement if they had to constantly revise their inventories as...-91-019, July 1991; ``Emission Projections,'' STAPPA/ALAPCO/EPA Emission Inventory Improvement Project... precursor emissions from industrial boilers and heaters, and that it should require replacement of old...

  13. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Science.gov (United States)

    2010-05-19

    ... Air Quality Planning Purposes; State of California; PM-10; Determination of Attainment for the Coso... determination that the Coso Junction nonattainment area (CJNA) has attained the 24-hour National Ambient Air... monitoring data for the PM-10 NAAQS from 2006-2008. In addition, reported data in EPA's Air Quality System...

  14. Plans for Implementing the Columbia River Basin Fish and Wildlife Program in Fiscal Year 1986.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1985-10-01

    The Fish and Wildlife Program is an effort to enhance, protect, and mitigate losses of those fish and wildlife which have been affected by the development, operation, and management of hydroelectric facilities in the Columbia River Basin. The implementation plan is organized to address the action items assigned to BPA in Section 1500 of the Council's Fish and Wildlife Program (1984). These action items generally relate to one or more specific measures in the Program. The following information is listed for each project: budget summary, projects, obligation plan, and work plan and milestones.

  15. Implementation of the EU Noise Directive in Process of Urban Planning in Poland

    Science.gov (United States)

    Kwiecień, J.; Szopińska, K.

    2013-05-01

    In Poland spatial planning policies are described by a system of planning documents controlled by act of Spatial Planning and Land Development of 27 March 2003. Sustainable development principle and spatial order form is the basis of spatial planning efforts. In the territory of Poland the manner of urban space management is defined by a planning document called Local Land Use Plan (LLUP). In a LLUP some issues are arranged, such as the purpose of a given area, location of public purpose investments, land development conditions. When analysing the development process of Polish cities, an obvious conclusion emerges about the lack of complex studies and researches of the environment concerning the issue of acoustic climate. The procedures of development of an LLUP involve merely a general diagnosis of an environment excluding measured values of pollution, including noise levels. The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.

  16. Implementation of standardized nursing languages (NIC, NOC) in on-line care planning and documentation.

    Science.gov (United States)

    Prophet, C M; Dorr, G G; Gibbs, T D; Porcella, A A

    1997-01-01

    At the University of Iowa Hospitals and Clinics (UIHC), the Standardized Nursing Languages (SNLs) of Nursing Interventions Classification (NIC) and Nursing-sensitive Outcomes Classification (NOC) are being implemented in on-line care planning and documentation. NIC and NOC are being integrated in the INFORMM NIS (Information Network For Retrieval & Medical Management Nursing Information System). The implementation process for SNLs includes six components: objectives, programming, database content, education, utilization, and evaluation. This process has been used successfully in NIC implementation and will be applied in NOC field testing.

  17. 76 FR 64020 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2011-10-17

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption... SIP revision meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources... ozone. EPA is approving this revision concerning the adoption of the CTG requirements for plastic...

  18. 78 FR 73442 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements

    Science.gov (United States)

    2013-12-06

    ... not have any board or body which approves air quality permits or enforcement orders. The requirements... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY...

  19. 78 FR 16412 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Science.gov (United States)

    2013-03-15

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY... is also approving public notice requirements for these permit actions. These rules will help...

  20. 78 FR 16825 - Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for...

    Science.gov (United States)

    2013-03-19

    ... AGENCY 40 CFR Part 49 Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for Navajo Generating Station; Extension of Comment Period AGENCY: Environmental Protection Agency... receive heightened protection. NGS is subject to the BART requirement of the CAA and the Regional Haze...

  1. 78 FR 58987 - Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for...

    Science.gov (United States)

    2013-09-25

    ... AGENCY 40 CFR Part 49 Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for Navajo Generating Station; Extension of Public Comment Period AGENCY: Environmental Protection... subject to the BART requirement of the CAA and the Regional Haze Rule (RHR) based on its age and its...

  2. 78 FR 16449 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Science.gov (United States)

    2013-03-15

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is... is also approving public notice requirements for these permit actions. These rules will help...

  3. 78 FR 41012 - Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for...

    Science.gov (United States)

    2013-07-09

    ... AGENCY 40 CFR Part 49 Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for Navajo Generating Station; Extension of Public Comment Period AGENCY: Environmental Protection... Congress to receive heightened protection. NGS is subject to the BART requirement of the CAA and the...

  4. 78 FR 73472 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements

    Science.gov (United States)

    2013-12-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA... purpose of addressing the State Boards' requirements for all criteria pollutants of the National Ambient...

  5. Effect of Implementing a Discharge Plan on Functional Abilities of Geriatric Patients with Hip Fractures

    Science.gov (United States)

    AL Khayya, Hatem; El Geneidy, Moshera; Ibrahim, Hanaa; Kassem, Mohamed

    2016-01-01

    Hip fracture is considered one of the most fatal fractures for elderly people, resulting in increased morbidity and mortality and impaired functional capacity, particularly for basic and instrumental activities of daily living. The aim of this study was to determine the effect of implementing a discharge plan on functional abilities of geriatric…

  6. 78 FR 43096 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut; Redesignation of...

    Science.gov (United States)

    2013-07-19

    ... the emission inventories for these pollutants and the effectiveness of specific control measures in.... Deliver your comments to: Anne Arnold, Manager, Air Quality Planning Unit, Office of Ecosystem Protection... permanent and enforceable reductions in emissions? 1. Federal Measures Implemented 2. SIP-Approved State...

  7. 78 FR 40940 - Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles

    Science.gov (United States)

    2013-07-09

    ... Animal and Plant Health Inspection Service 7 CFR Part 357 RIN 0579-AD11 Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION... and are threatened with extinction); and (iii) plants that are to remain planted or to be planted...

  8. 75 FR 15391 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to Control...

    Science.gov (United States)

    2010-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to... tanks, transport vessels and marine vessels in the Houston/Galveston/Brazoria (HGB) 1997 8-hour ozone..., transport vessels, and marine vessels located in the HGB 1997 8-hour ozone nonattainment area to more...

  9. 75 FR 15348 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To Control...

    Science.gov (United States)

    2010-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To... tanks, transport vessels and marine vessels in the Houston/Galveston/Brazoria (HGB) 1997 8-hour ozone... vessels, and marine vessels located in the HGB 1997 8-hour ozone nonattainment area to more stringent...

  10. Effect of Implementing a Birth Plan on Womens' Childbirth Experiences and Maternal & Neonatal Outcomes

    Science.gov (United States)

    Farahat, Amal Hussain; Mohamed, Hanan El Sayed; Elkader, Shadia Abd; El-Nemer, Amina

    2015-01-01

    Childbirth satisfaction represents a sense of feeling good about one's birth. It is thought to result from having a sense of control, having expectations met, feeling empowered, confident and supported. The aim of this study was to implement a birth plan and evaluate its effect on women's childbirth experiences and maternal, neonatal outcomes. A…

  11. 77 FR 69409 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2012-11-19

    ... emissions of power plants and industrial facilities. Nitrates, another common type of secondary particle... emissions resulting from implementation of the applicable SIP and applicable federal air pollutant control... in planning and emission control rule development. Section 110(a)(2)(D) requires that SIPs...

  12. 78 FR 19128 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Science.gov (United States)

    2013-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... particulate matter (PM) rules on February 23, 2012. The PM rule revisions being approved establish work... disclosure is restricted by statute. Certain other material, such as copyrighted material, will be...

  13. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    Science.gov (United States)

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  14. Predicting Teachers' Intentions to Implement School-Based Assessment Using the Theory of Planned Behaviour

    Science.gov (United States)

    Yan, Zi

    2014-01-01

    The theory of planned behaviour (TPB) was used to explore the Hong Kong teachers' intentions to implement school-based assessment (SBA) and the predictors of those intentions. A total of 280 teachers from Hong Kong secondary schools who had been involved in SBA were surveyed. Rasch-calibrated teacher measures were calculated for each of the 6…

  15. 78 FR 57267 - Approval and Promulgation of Implementation Plans; State of Missouri; Conformity of General...

    Science.gov (United States)

    2013-09-18

    ... (44 U.S.C. 3501 et seq.); is certified as not having a significant economic impact on a substantial... revision amends rule 10 CSR 10-6.300 Conformity of General Federal Actions to State Implementation Plans... affect the stringency of the SIP or adversely impact air quality. II. Have the requirements for approval...

  16. Implementing a New Evaluation System for Principals: An Experience in Planned Change.

    Science.gov (United States)

    Lindahl, Ronald A.

    1986-01-01

    While pressures to revise administrator evaluation systems are increasing, the actual process demands great time, energy, and commitment to planned change. This article describes a large urban school district's efforts to redefine evaluation purposes, develop a process and principles, and implement and assess the new system. Includes 23…

  17. 75 FR 69884 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ..., 2002, the TNRCC also adopted revisions to the Emission Credit Banking and Trading Program (referred to... 101, Subchapter H, Division 3, Section 101.357, and the Discrete Emission Credit Banking and Trading... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Emissions Banking...

  18. 75 FR 57412 - Approval and Promulgation of Implementation Plans Alabama: Volatile Organic Compounds

    Science.gov (United States)

    2010-09-21

    ... ``volatile organic compounds'' (VOCs) found at Alabama Administrative Code section 335-3-1-.02(gggg... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans Alabama: Volatile Organic Compounds AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing...

  19. 77 FR 12482 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for...

  20. 75 FR 5707 - Approval and Promulgation of Implementation Plans; Albuquerque-Bernalillo County, NM; Excess...

    Science.gov (United States)

    2010-02-04

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Albuquerque- Bernalillo County, NM; Excess Emissions AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... by the Governor of New Mexico on behalf of the Albuquerque Environmental Health Department (AEHD)...

  1. 75 FR 68447 - Approval and Promulgation of Implementation Plans; Albuquerque/Bernalillo County, NM; Interstate...

    Science.gov (United States)

    2010-11-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Albuquerque/ Bernalillo County, NM; Interstate Transport of Pollution AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The EPA is approving a revision to the Albuquerque/Bernalillo County, New Mexico...

  2. 78 FR 63878 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Science.gov (United States)

    2013-10-25

    ... Ambient Air Quality Standards for Fine Particulate Matter AGENCY: Environmental Protection Agency (EPA... Commonwealth of Virginia State Implementation Plan (SIP). The revisions add ambient air quality standards and... National Ambient Air Quality Standards (NAAQS) for PM 2.5 . EPA is approving these revisions in...

  3. 76 FR 74014 - Approval and Promulgation of Implementation Plans; Illinois; Volatile Organic Compound Emission...

    Science.gov (United States)

    2011-11-30

    ... Compound Emission Control Measures for Chicago and Metro-East St. Louis Ozone Nonattainment Areas AGENCY... compound (VOC) rules for approval into its State Implementation Plan (SIP). The purpose of these rules is... does not exceed 8.00 millimeters of mercury (mmHg) or by use of add-on control (i.e., an afterburner...

  4. 77 FR 10424 - Approval and Promulgation of Implementation Plans; Wisconsin; Volatile Organic Compound Emission...

    Science.gov (United States)

    2012-02-22

    ... Compound Emission Control Measures for Milwaukee and Sheboygan Ozone Nonattainment Areas AGENCY... organic compound (VOC) rules for approval into its State Implementation Plan (SIP). The purpose of these... millimeters (mm) of mercury (Hg) and the solvent or solvent solution must be collected and stored in...

  5. 76 FR 45741 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor...

    Science.gov (United States)

    2011-08-01

    ... Commonwealth of Pennsylvania for the purpose of incorporating the Commonwealth's Diesel-Powered Motor Vehicle... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor Vehicle Idling Act AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed...

  6. 77 FR 35273 - Approval and Promulgation of Implementation Plans; New Mexico; Minor New Source Review (NSR...

    Science.gov (United States)

    2012-06-13

    ... ginning capacity and cotton production trends, cotton ginning activity in New Mexico is not expected to... in New Mexico, and the owner chooses the Part 66 alternative method, the cotton gin facility must... AGENCY 40 CFR Parts 52 Approval and Promulgation of Implementation Plans; New Mexico; Minor New Source...

  7. 77 FR 49404 - Approval and Promulgation of Air Quality Implementation Plans; Vermont: Prevention of Significant...

    Science.gov (United States)

    2012-08-16

    ..., beryllium, and vinyl chloride) that are not listed in the federal regulation. On the other hand, Vermont... ``Prevention of Significant Deterioration and Title V Greenhouse Gas Tailoring Rule; Final Rule'' (75 FR 31514...-Sources in State Implementation Plans; Final Rule,'' 75 FR 82536 (December 30, 2010) (the ``PSD...

  8. 78 FR 78315 - Revision to the Idaho State Implementation Plan; Approval of Fine Particulate Matter Control...

    Science.gov (United States)

    2013-12-26

    ... AGENCY 40 CFR Part 52 Revision to the Idaho State Implementation Plan; Approval of Fine Particulate... particulate matter (PM 2.5 ) nonattainment area (Logan UT-ID). The EPA is proposing a limited approval of PM 2..., the disclosure of which is restricted by statute. Certain other material, such as copyrighted...

  9. 76 FR 4578 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2011-01-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Flat Wood Paneling Coatings AGENCY: Environmental Protection... Available Control Technology (RACT) for sources covered by EPA's Control Techniques Guidelines (CTG) for...

  10. 76 FR 27610 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2011-05-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Large Appliance Coatings AGENCY: Environmental Protection Agency... Processes and meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources...

  11. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air...

  12. 78 FR 12267 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-02-22

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD...

  13. 76 FR 10249 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control...

    Science.gov (United States)

    2011-02-24

    ... pollution regulations and control strategies to ensure that air quality meets the National Ambient Air... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control Volatile Organic Compound Emissions From Consumer Related Sources AGENCY: Environmental Protection...

  14. 76 FR 4534 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2011-01-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Flat Wood Paneling Coatings AGENCY: Environmental Protection... Processes, and meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources...

  15. 76 FR 48754 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Reasonably Available Control...

    Science.gov (United States)

    2011-08-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Reasonably Available Control Technology, Oxides of Nitrogen, Cleveland Ozone Non-Attainment AGENCY: Environmental... ) Reasonably Available Control Technology (RACT) for major sources in the former Cleveland-Akron-Lorain...

  16. 76 FR 10295 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control...

    Science.gov (United States)

    2011-02-24

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions To Control Volatile Organic Compound Emissions From Consumer Related Sources AGENCY: Environmental Protection..., Control of Air Pollution from Volatile Organic Compounds. The State submitted these revisions on March 4...

  17. 76 FR 64015 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2011-10-17

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control Techniques Guidelines for Drum and Pail Coatings AGENCY: Environmental Protection Agency... revision meets the requirement to adopt Reasonably Available Control Technology (RACT) for sources covered...

  18. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  19. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  20. 77 FR 67322 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-11-09

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... authority to address disproportionate human health or environmental effects with practical, appropriate,...

  1. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2011-01-03

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and... and amend the Emissions Banking and Trading of Allowances (EBTA) Program. The EBTA Program establishes... Banking and Trading of Allowances (EBTA) Program. The EBTA Program establishes a cap and trade program to...

  2. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and... (SIP) that create and amend the Emissions Banking and Trading of Allowances (EBTA) Program. The EBTA...

  3. 75 FR 81484 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-12-28

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and... Banking and Trading of Allowances (EBTA) Program. The EBTA Program establishes a cap and trade program to...

  4. 77 FR 41914 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Science.gov (United States)

    2012-07-17

    ... by the Indiana Department of Environmental Management (IDEM) on May 14, 2012, to revise the Indiana State Implementation Plan (SIP). The submission revises the Indiana Administrative Code (IAC) definition... 326 IAC 1-1-3, definition of ``References to Code of Federal Regulations.'' IDEM updated the reference...

  5. 76 FR 27904 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Science.gov (United States)

    2011-05-13

    ... by the Indiana Department of Environmental Management (IDEM) on November 24, 2010, to revise the Indiana State Implementation Plan (SIP). The submission revises the Indiana Administrative Code (IAC) by amending and updating the definition of ``References to the Code of Federal Regulations,'' to refer to the...

  6. 76 FR 27973 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Science.gov (United States)

    2011-05-13

    ... submitted by the Indiana Department of Environmental Management on November 24, 2010 to revise the Indiana State Implementation Plan (SIP). The submission revises the Indiana Administrative Code (IAC) by amending and updating the definition of ``References to the Code of Federal Regulations,'' to refer to the...

  7. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    Science.gov (United States)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  8. 76 FR 68103 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-03

    ... Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... Rulemaking For the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control...

  9. Design and implementation of a financial planning and tracking system for the Nova Project

    Energy Technology Data Exchange (ETDEWEB)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation.

  10. 78 FR 12459 - State Implementation Plans: Response to Petition for Rulemaking; Findings of Substantial...

    Science.gov (United States)

    2013-02-22

    ... request in the Petition to rescind its policy interpreting the Clean Air Act (CAA) to allow states to have appropriately drawn state implementation plan (SIP) provisions that provide affirmative defenses to monetary... action reflects the EPA's current SSM Policy for SIPs. DATES: Comments. Comments must be received on or...

  11. Improving Strategic Planning and Implementation in Universities through Competitive Intelligence Tools: A Means to Gaining Relevance

    Science.gov (United States)

    Hughes, Stephanie; White, Rebecca J.

    2005-01-01

    Institutions of higher education can use competitive intelligence (CI) techniques to become more relevant to their communities. In Stepping Forward as Stewards of Place the American Association of State Colleges and Universities (AASCU) provides a model for public engagement that emphasizes internal strategic planning, implementation, and…

  12. Strengthening the Reading-Writing Connection: A Plan for Implementing Young Author's Conferences.

    Science.gov (United States)

    Gorsuch, Sarah; Furnas, Judy

    1989-01-01

    Discusses how workshops for young authors help to cement the reading-writing connection for students and build their motivation and enthusiasm. Provides a step-by-step outline for educators who are interested in planning and implementing a young author's conference. (MG)

  13. 77 FR 16676 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... contained in the Commonwealth's Implementation Plan and Operating Permits Program. They do not change the... Clean Air Act (CAA or Act), the Commonwealth of Puerto Rico is regarded as a state. Generally the...

  14. 77 FR 58955 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Pennsylvania...

    Science.gov (United States)

    2012-09-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of... (EPA). ACTION: Final rule. SUMMARY: EPA is approving submittals from the Commonwealth of Pennsylvania... FR 54410), EPA published a notice of proposed rulemaking (NPR) for the Commonwealth of Pennsylvania...

  15. 76 FR 62635 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Virginia; Section...

    Science.gov (United States)

    2011-10-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of... (EPA). ACTION: Final rule. SUMMARY: EPA is approving submittals from the Commonwealth of Virginia... published a notice of proposed rulemaking (NPR) for the Commonwealth of Virginia. The NPR proposed approval...

  16. 77 FR 16795 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... clarity of the rules contained in the Commonwealth's Implementation Plan and Operating Permits Program... Regulations'' section of this Federal Register, EPA is approving the Commonwealth's SIP submittal as a direct...

  17. 77 FR 27626 - Approval and Promulgation of Implementation Plans; Commonwealth of Kentucky; Regional Haze State...

    Science.gov (United States)

    2012-05-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Commonwealth of Kentucky...) submitted by the Commonwealth of Kentucky through the Kentucky Energy and Environment Cabinet, Division for... the Commonwealth's May 28, 2010 submittal. ] BILLING CODE 6560-50-P ...

  18. 76 FR 54410 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Pennsylvania...

    Science.gov (United States)

    2011-09-01

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of... (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve submittals from the Commonwealth of... Pennsylvania, the Commonwealth has a SIP approved PSD program in place and EPA has found that the 110(a)(2...

  19. 76 FR 41444 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Virginia; Section...

    Science.gov (United States)

    2011-07-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of... (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve submittals from the Commonwealth of...-OAR-2010-0160. III. General Information Pertaining to SIP Submittals From the Commonwealth of Virginia...

  20. 75 FR 16388 - Approval and Promulgation of Implementation Plans; Commonwealth of Kentucky: Prevention of...

    Science.gov (United States)

    2010-04-01

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Commonwealth of Kentucky... Today? The Commonwealth of Kentucky, through KDAQ, submitted a revision on February 5, 2010, to the... Analysis of Kentucky's SIP Revision? On February 5, 2010, the Commonwealth of Kentucky submitted a revision...

  1. 78 FR 896 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-01-07

    ... is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  2. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Science.gov (United States)

    2011-03-29

    ...) * * * (D) Great Basin Unified Air Pollution Control District (1) Rule 201, ``Exemptions,'' adopted on... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec....

  3. 76 FR 30080 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency... Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion...

  4. 76 FR 60405 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Sacramento Municipal Air Quality Management District and South Coast Air Quality... proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD),...

  5. 75 FR 56942 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Diego Air Pollution Control District...

  6. 78 FR 15895 - Approval and Promulgation of Air Quality Implementation Plans: North Carolina; Control Techniques...

    Science.gov (United States)

    2013-03-13

    ... 2D, .0521, .0614, NCAC 2Q .0102, .0304, and .0902. These rules address Air Pollution Control, Emission Control Standards, Monitoring and Recordkeeping and Air Quality Permit Procedures and are not... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans: North...

  7. 78 FR 37176 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of...

  8. 78 FR 53249 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-08-29

    ... finalizing approval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air...

  9. 78 FR 6784 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of...

  10. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-01-19

    ... finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control...) * * * (i) * * * (D) Placer County Air Pollution Control District (1) Rule 233, ``Biomass Boilers,'' amended... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air...

  11. 77 FR 1873 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-01-12

    ... Submittal III. Final Action IV. Statutory and Executive Order Reviews I. Background On July 18, 1997 (62 FR... Area. Subsequently, on April 5, 2011 (76 FR 18650), EPA determined that the Rome Area attained the 1997... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine...

  12. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  13. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  14. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  16. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... taking direct final action to approve revisions to the Antelope Valley Air Quality Management District... Valley Air Quality Management District (AVAQMD) and submitted by the California Air Resources Board (CARB... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  17. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-13

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  18. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Feather River Air...

  19. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District portion of the...

  20. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  1. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  2. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  3. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  4. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  5. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  6. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion...

  7. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-10-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  8. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of...

  9. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... River Air Quality Management District. (1) Rule 3.22, ``Internal Combustion Engines,'' adopted on June... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  10. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution... AGENCY 40 CFR Part 52 Revisions to California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  11. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the South Coast Air Quality...

  12. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  13. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  14. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  16. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  17. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-11-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  18. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  19. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-01-25

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  20. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... AGENCY 40 CFR Part 52 Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing disapproval of a revision to the South Coast Air Quality Management District (SCAQMD) portion...

  1. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... the Antelope Valley Air Quality Management District (AVAQMD) and Mojave Desert Air Quality...

  2. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  3. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  4. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-06-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  5. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-05-23

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  6. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  7. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  8. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions...

  9. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air...

  10. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... taking direct final action to approve revisions to the Mojave Desert Air Quality Management District... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air...

  11. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  12. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  13. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  14. 76 FR 59600 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Redesignation of Lake and...

    Science.gov (United States)

    2011-09-27

    ...; Redesignation of Lake and Porter Counties to Attainment of the Fine Particulate Matter Standard AGENCY... Management (IDEM) requested redesignation of the Lake and Porter Counties, Indiana portion (Lake and Porter... Porter Counties, along with related Indiana State Implementation Plan (SIP) revisions, including the...

  15. Post-Implementation Success Factors for Enterprise Resource Planning Student Administration Systems in Higher Education Institutions

    Science.gov (United States)

    Sullivan, Linda; Bozeman, William

    2010-01-01

    Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…

  16. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Science.gov (United States)

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  17. Improving Training in Enterprise Resource Planning Systems Implementation through Communities of Practice

    Science.gov (United States)

    Kerr, Don; Burgess, Kevin J.; Houghton, Luke; Murray, Peter A.

    2012-01-01

    The Enterprise Resource Planning (ERP) literature suggests that effective training is one of the key reasons for success in ERP implementations. However, limited research has been conducted on what constitutes effective training in an ERP environment. A case study approach was used to explore the effectiveness of traditional training and to…

  18. 77 FR 22676 - Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District

    Science.gov (United States)

    2012-04-17

    ... AGENCY 40 CFR Part 52 Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited approval and limited disapproval of a revision to the Pinal County Air Quality...

  19. 78 FR 34911 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Low Emission Vehicle...

    Science.gov (United States)

    2013-06-11

    ... argues that the current pace in limiting GHG emissions is insufficient to limit climate change or to... CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Low...

  20. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Description.

    Science.gov (United States)

    Ford, Valeria A.

    The design of the Planning, Monitoring, and Implementation Model (PMI) and the aspects of the model that make it useful in public schools are the topics of this paper. After the objectives of a program or operation have been identified, the model specifies three additional pieces of information that are needed for an evaluation: inputs, processes,…

  1. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Rationale.

    Science.gov (United States)

    Cort, H. Russell

    The rationale for the Planning, Monitoring, and Implementation Model (PMI) is the subject of this paper. The Superintendent of the District of Columbia Public Schools requested a model for systematic evaluation of educational programs to determine their effectiveness. The school system's emphasis on objective-referenced instruction and testing,…

  2. 78 FR 4804 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-01-23

    ... AGENCY 40 CFR Part 52 Revision to the Washington State Implementation Plan; Tacoma- Pierce County... (CAA) requirements related to the Tacoma-Pierce County nonattainment area for the 2006 fine particulate... Tacoma-Pierce County Clean Air Task Force, an advisory committee of community leaders, citizen...

  3. 78 FR 55029 - Approval and Promulgation of Implementation; Texas; Houston: Reasonable Further Progress Plan...

    Science.gov (United States)

    2013-09-09

    ... 57 261. ] Table 8--VMT Offset Inventory Scenarios and Results Fleet turnover VMT Offset scenario... proposing to approve revisions to the Texas State Implementation Plan to the emissions inventory (EI), the...? III. What is EPA's evaluation of the revisions? A. Base Year Emissions Inventory B. Adjusted Base Year...

  4. 78 FR 57335 - Approval and Promulgation of Implementation Plans; State of Missouri; Conformity of General...

    Science.gov (United States)

    2013-09-18

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri; Conformity of... conformity rule in its entirety to bring it into compliance with the Federal general conformity rule which was updated in the Federal Register on April 5, 2010. General conformity regulations prohibit...

  5. 77 FR 38199 - Determining Conformity of Federal Actions to State or Federal Implementation Plans

    Science.gov (United States)

    2012-06-27

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 93 Determining Conformity of Federal Actions to State or Federal Implementation Plans... conformity purposes, the budget(s) shall not be used to satisfy the requirements of this section....

  6. 77 FR 1894 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-01-12

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate... October 27, 2009. The emissions inventory is part of the Rome, Georgia PM 2.5 attainment...

  7. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    Science.gov (United States)

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  8. 78 FR 35181 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Revisions to Utah...

    Science.gov (United States)

    2013-06-12

    ... revisions contain new, amended and renumbered rules in Utah Administrative Code (UAC) Title R-307 that... Utah Administrative Code--Permit: New and Modified Sources AGENCY: Environmental Protection Agency (EPA... Implementation Plan. (vii) The initials UAC mean or refer to the Utah Administrative Code. I. General...

  9. 76 FR 40246 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Gasoline...

    Science.gov (United States)

    2011-07-08

    ... Gasoline Volatility; Correction AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... Implementation Plan. This revision is for the purpose of establishing a gasoline Reid Vapor Pressure (RVP) limit of 7.8 pounds per square inch (psi) for gasoline sold in the Cincinnati and ] Dayton areas...

  10. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  11. 76 FR 70940 - Approval and Promulgation of Air Quality Implementation Plans; Oklahoma; Infrastructure...

    Science.gov (United States)

    2011-11-16

    ... promulgated under the Act.\\20\\ \\19\\ Except for indoor air quality and asbestos as regulated for worker safety... and the 1997 and 2006 fine particulate matter (PM 2.5 ) national ambient air quality standards (NAAQS or standards). We are proposing to find that the current Oklahoma State Implementation Plan (SIP...

  12. 77 FR 68721 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Deferral for CO2

    Science.gov (United States)

    2012-11-16

    ...EPA is reopening the comment period for a notice of proposed rulemaking (NPR) published on September 7, 2012. In the NPR, EPA proposed approval of a revision to the Maryland State Implementation Plan (SIP) that would incorporate EPA's ``Biomass Deferral'' into the Maryland SIP. At the request of Community Research, (College Park, Maryland), EPA is reopening the comment period. Comments......

  13. 77 FR 23178 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2

    Science.gov (United States)

    2012-04-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2 Emissions From Bioenergy and Other Biogenic Sources Under the Prevention of...

  14. 77 FR 65627 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2

    Science.gov (United States)

    2012-10-30

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2 Emissions From Bioenergy and other Biogenic Sources Under the Prevention of...

  15. 78 FR 13497 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Deferral for CO2

    Science.gov (United States)

    2013-02-28

    ...EPA is approving a State Implementation Plan (SIP) revision submitted by the Maryland Department of the Environmental (MDE) on April 4, 2012. This revision defers until July 21, 2014 the application of the Prevention of Significant Deterioration (PSD) permitting requirements to biogenic carbon dioxide (CO2) emissions from bioenergy and other biogenic stationary sources in the State......

  16. 75 FR 14352 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Science.gov (United States)

    2010-03-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD... significant deterioration (PSD) construction permit program under the Federal Clean Air Act (CAA). This program affects major stationary sources in Michigan that are subject to or potentially subject to the PSD...

  17. 75 FR 59081 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Science.gov (United States)

    2010-09-27

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD... serve to meet specific requirements of the prevention of significant deterioration (PSD) construction... Michigan that are subject to or potentially subject to the PSD construction permit program. On July 16...

  18. 75 FR 59179 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Science.gov (United States)

    2010-09-27

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD...). The revisions serve to meet specific requirements of the prevention of significant deterioration (PSD...

  19. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution Control District... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial Valley Air Pollution Control District AGENCY: Environmental Protection...

  20. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas Turbines... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality...

  1. 75 FR 8493 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the...

    Science.gov (United States)

    2010-02-25

    ... in the public docket and made available on the Internet. If you submit an electronic comment, EPA... to the Definition of Volatile Organic Compound and Other Terms AGENCY: Environmental Protection... to the Virginia State Implementation Plan (SIP). The revisions amend the wording of 22...

  2. 77 FR 58953 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control Technique...

    Science.gov (United States)

    2012-09-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control... published in the Federal Register. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2). C... compounds. Dated: September 7, 2012. Shawn M. Garvin, Regional Administrator, Region III. 40 CFR part 52...

  3. Problems of Implementation of Strategic Plans for Secondary Schools' Improvement in Anambra State

    Science.gov (United States)

    Chukwumah, Fides Okwukweka; Ezeugbor, Carol Obiageli

    2015-01-01

    This study investigated the extent of problems of strategic plans implementation for secondary schools' improvement in Anambra State, Nigeria for quality education provision. The study used a descriptive survey design paradigm. Respondents comprised 217 principals. There was no sampling. All the principals were used. Data were collected using…

  4. Reciprocal Peer Coaching: A Critical Contributor to Implementing Individual Leadership Plans

    Science.gov (United States)

    Goldman, Ellen; Wesner, Marilyn; Karnchanomai, Ornpawee

    2013-01-01

    Billions of dollars are spent annually on programs to develop organizational leaders, yet the effectiveness of these programs is poorly understood. Scholars advise that value is enhanced by the development of individual leadership plans at program completion, followed by implementation experience with subsequent coaching and reflection. The…

  5. Akzo Nobel Morris Plant Implements a Site-Wide Energy Efficiency Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-01-01

    Akzo Nobel's Surface Chemistry plant in Morris, Illinois, implemented an energy efficiency plan, which included a plant-wide energy efficiency assessment. The assessment revealed opportunities to save an estimated $1.2 million per year in operating and energy costs, reduce environmental impacts, and improve production capacity.

  6. 77 FR 47536 - Revisions to the California State Implementation Plan, Mojave Desert, Northern Sierra, Sacramento...

    Science.gov (United States)

    2012-08-09

    ... Desert Air Quality Management District. (1) Rule 1116, ``Automotive Refinishing Operations,'' amended on... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert, Northern... to the Mojave Desert Air Quality Management District (MDAQMD), Northern Sierra ] Air Quality...

  7. 76 FR 36450 - Approval and Promulgation of Air Quality Implementation Plans; State of Nevada; Regional Haze...

    Science.gov (United States)

    2011-06-22

    .... For each Class I area within its boundaries, the state must establish a reasonable progress goal (RPG... enforceable emission limits and other measures as necessary to achieve the RPG. State implementation plans...) emissions limitations and schedules for compliance to achieve the RPG; (4) source retirement and replacement...

  8. 77 FR 11928 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Regional Haze

    Science.gov (United States)

    2012-02-28

    ..., the reasonable progress goal (RPG). Section 169A of the CAA and EPA's implementing regulations require states to establish long-term strategies for making reasonable progress toward meeting the RPG. Plans... RPG; (4) source retirement and replacement schedules; (5) smoke management techniques for agricultural...

  9. 76 FR 10897 - Status of Motor Vehicle Budgets in Submitted State Implementation Plan for Transportation...

    Science.gov (United States)

    2011-02-28

    ... AGENCY Status of Motor Vehicle Budgets in Submitted State Implementation Plan for Transportation... Adequacy of Motor Vehicle Emissions Budget AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of... Register on February 9, 2011 (76 FR 7204) announcing that EPA has withdrawn its May 30, 2008...

  10. 78 FR 57503 - Revision to the Washington State Implementation Plan; Approval of Motor Vehicle Emission Budgets...

    Science.gov (United States)

    2013-09-19

    ... AGENCY 40 CFR Part 52 Revision to the Washington State Implementation Plan; Approval of Motor Vehicle Emission Budgets and Determination of Attainment for the 2006 24-Hour Fine Particulate Standard; Tacoma... November 28, 2012, to establish motor vehicle emission budgets for the Tacoma-Pierce County...

  11. 76 FR 8736 - Status of Motor Vehicle Budgets in Submitted State Implementation Plan for Transportation...

    Science.gov (United States)

    2011-02-15

    ... AGENCY Status of Motor Vehicle Budgets in Submitted State Implementation Plan for Transportation Conformity Purposes; Connecticut; Notice of Withdrawal of Adequacy of Motor Vehicle Emissions Budgets AGENCY... public that EPA has withdrawn its previous adequacy finding on the 2012 motor vehicle emission...

  12. 76 FR 7204 - Status of Motor Vehicle Budgets in Submitted State Implementation Plan for Transportation...

    Science.gov (United States)

    2011-02-09

    ... AGENCY Status of Motor Vehicle Budgets in Submitted State Implementation Plan for Transportation... Adequacy of Motor Vehicle Emissions Budget AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of... the 2010 particulate matter of ten microns or less (PM-10) motor vehicle emission budget (MVEB)...

  13. Predicting Teachers' Intentions to Implement School-Based Assessment Using the Theory of Planned Behaviour

    Science.gov (United States)

    Yan, Zi

    2014-01-01

    The theory of planned behaviour (TPB) was used to explore the Hong Kong teachers' intentions to implement school-based assessment (SBA) and the predictors of those intentions. A total of 280 teachers from Hong Kong secondary schools who had been involved in SBA were surveyed. Rasch-calibrated teacher measures were calculated for each of the 6…

  14. MEDBASE: Strategic Planning and Implementation of an Army Medical Department Software Application

    Science.gov (United States)

    2006-05-31

    developing the plan: stakeholder analysis , SWOT analysis , a list of competitors ’ strengths and weaknesses, the development of a big, hairy, audacious goal...was created along with the following products: SWOT (strengths, weaknesses, opportunities, and threats) analysis , vision statement, strategy map, and...Implementation, AMEDD Architecture, Strategy Map, Balanced Scorecard, Life Cycle Model, SWOT Analysis , Interim Systems, Injury Tracking, Medical Readiness

  15. Technology Implementation Plan. Fully Ceramic Microencapsulated Fuel for Commercial Light Water Reactor Application

    Energy Technology Data Exchange (ETDEWEB)

    Snead, Lance Lewis [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Powers, Jeffrey J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Worrall, Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Robb, Kevin R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Snead, Mary A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-04-01

    This report is an overview of the implementation plan for ORNL's fully ceramic microencapsulated (FCM) light water reactor fuel. The fully ceramic microencapsulated fuel consists of tristructural isotropic (TRISO) particles embedded inside a fully dense SiC matrix and is intended for utilization in commercial light water reactor application.

  16. 78 FR 26301 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and...

    Science.gov (United States)

    2013-05-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and AIM Rules AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA... for additional consumer products categories into the State's SIP. Finally, EPA is proposing to approve...

  17. 76 FR 68638 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Science.gov (United States)

    2011-11-07

    ... Nitrogen Oxides Budget Trading Program AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Implementation Plan (SIP). The revision pertains to regulatory language in its nitrogen oxides (NO X ) Budget..., Nitrogen dioxide, Ozone, Sulfur oxides. Dated: October 25, 2011. W.C. Early, Acting Regional...

  18. 77 FR 30216 - Approval and Promulgation of Air Quality Implementation Plans; Maine; Reasonably Available...

    Science.gov (United States)

    2012-05-22

    ... Floor of the Tyson Building, Augusta Mental Health Institute Complex, Augusta, ME 04333-0017. FOR... Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maine;...

  19. 40 CFR 52.823 - PM10 State Implementation Plan Development in Group II Areas.

    Science.gov (United States)

    2010-07-01

    ... Development in Group II Areas. 52.823 Section 52.823 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... State Implementation Plan Development in Group II Areas. The Iowa Department of Natural Resources...: Three groups within the State of Iowa have been classified as Group II areas for fine particulate...

  20. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on...

  1. 75 FR 18142 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Science.gov (United States)

    2010-04-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution From Motor Vehicles AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Title 30 of the Texas Administrative Code (TAC), Chapter 114, Control of Air Pollution from...

  2. 77 FR 7536 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-02-13

    ... is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Joaquin Valley Unified...

  3. 78 FR 4333 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Requirements for...

    Science.gov (United States)

    2013-01-22

    ... several definitions, including ``Applicable implementation plan'' and ``Applicable SIP.'' Several terms no...,'' ``State Governor,'' ``State and Local Air Agencies,'' and ``State Agency.'' Definitions were added for the... CSR Series 35 and by: 0 a. Revising the entries for 45-35-1 through 45-35-4; and 0 b. Adding a...

  4. Improving district level health planning and priority setting in Tanzania through implementing accountability for reasonableness framework

    DEFF Research Database (Denmark)

    Maluka, Stephen; Kamuzora, Peter; Sebastián, Miguel San

    2010-01-01

    In 2006, researchers and decision-makers launched a five-year project - Response to Accountable Priority Setting for Trust in Health Systems (REACT) - to improve planning and priority-setting through implementing the Accountability for Reasonableness framework in Mbarali District, Tanzania...

  5. [Russian Federation implementation of WHO global efforts plan on workers health care].

    Science.gov (United States)

    Izmerov, N F; Bukhtiyarov, I V; Prokopenko, L V; Shigan, E E

    2015-01-01

    The article deals with problems of implementing global WHO efforts plan on workers health care, Target program of World Labor Organization on work and occupational environment safety "For safe labor", some WLO conventions. The authors justify priority directions of governmental policy on health care for working population in Russia.

  6. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... submitted for the South Coast Air Quality Management District (District) portion of the California State... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of Significant Deterioration; Greenhouse Gases AGENCY: Environmental...

  7. Identifying the 'if' for 'if-then' plans : Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, Aukje A. C.; Adriaanse, Marieke A.; de Vet, Emely; Fennis, Bob M.; de Ridder, Denise T. D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  8. The Effects of Organizational Characteristics on Enterprise Resource Planning Implementation Success and Perceived Organizational Performance

    Directory of Open Access Journals (Sweden)

    Yaşar AKÇA

    2014-06-01

    Full Text Available The aim of this study is to demonstrate the effects of organizational characteristics on Enterprise Resource Planning (ERP system implementation success and organizational performance. For this purpose, data obtained from 236 firms through surveys were analyzed using correlation, factor and regression analysis. The results were as follows; (1 While top management support had a statistically significant and positive effect on ERP implementation success, it had no significant effect on perceived organizational performance. (2 Organizational consensus had a statistically significant effect on neither ERP implementation success nor organizational performance. (3 The effect of training on ERP implementation success and organizational performance was positive. (4 Although information intensity didn’t have an effect on ERP implementation success, it had a statistically significant and positive effect on organizational performance

  9. An appraisal of adaptive management planning and implementation in ecological restoration

    DEFF Research Database (Denmark)

    Nagarkar, Mita; Raulund-Rasmussen, Karsten

    2016-01-01

    implemented, but also what changes can be made to facilitate the adaptive management approach without sacrificing scientific rigor. Adaptive management seems to be directly and indirectly affected by a variety of challenges and convoluted by ambiguity in both planning documents and practitioner......Adaptive management has been defined and redefined in the context of natural resource management, yet there are few examples of its successful application in ecological restoration. Although the 2009 Delta Reform Act now legally requires adaptive management for all restoration efforts...... in the Sacramento-San Joaquin Delta, in California, USA, projects in this region still encounter problems with implementation. We used a comparative case study analysis to examine adaptive management planning and implementation both in and around the Delta, assessing not only why adaptive management is not yet well...

  10. Critical Success Factors for Enterprise Resource Planning System Implementation: A Case Study in Malaysian SME

    Directory of Open Access Journals (Sweden)

    Feybi Ariani Goni

    2011-01-01

    Full Text Available Implementing Enterprise Resource Planning (ERP system for Malaysian Small to Medium Enterprises (SMEs is not just a technological challenge. It is a socio-technological endeavour which mandates modifying existing applications and redesigning business processes to facilitate ERP system implementation. Most Malaysian SMEs cannot afford to adopt an existing ERP system due to the extremely high cost and complex implementation. The ERP system implementation literature contains many case studies of organizations that have implemented ERP system successfully. However, many Malaysian SMEs do not achieve success in their ERP system implementation. There are very few studies have represented and developed critical success factors of ERP system implementation projects highlighted for SMEs. This research seeks to explore the critical success factors for successful ERP system implementation in Malaysian SMEs. The research method is based on a case study within Malaysian SME to perform a critical success factors model of ERP system implementation adoption which has validated by a number of SMEs in Malaysia. The proposed model will help outline the critical factors that should be considered by Malaysian SMEs in uccessfully adopting ERP system.

  11. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  12. Implementing the Affordable Care Act: choosing an essential health benefits benchmark plan.

    Science.gov (United States)

    Corlette, Sabrina; Lucia, Kevin W; Levin, Max

    2013-03-01

    To improve the adequacy of private health insurance, the Affordable Care Act requires insurers to cover a minimum set of medical benefits, known as "essential health benefits." In implementing this requirement, states were asked to select a "benchmark plan" to serve as a reference point. This issue brief examines state action to select an essential health benefits benchmark plan and finds that 24 states and the District of Columbia selected a plan. All but five states will have a small-group plan as their benchmark. Each state, whether or not it made a benchmark selection, will have a set of essential health benefits that reflects local, employer-based health insurance coverage currently sold in the state. States adopted a variety of approaches to selecting a benchmark, including intergov­ernmental collaboration, stakeholder engagement, and research on benchmark options.

  13. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  14. The Challenges of Implementing Sustainable Development: The Case of Sofia’s Master Plan

    Directory of Open Access Journals (Sweden)

    Aleksandar D. Slaev

    2016-12-01

    Full Text Available In this paper, we explore how master planning promotes and implements particular urban development patterns and, more generally, contributes to sustainability. Our goal is to understand the link between urban growth intentions articulated through the master planning process and realisation of its specific forms, e.g., monocentric or polycentric, compact or dispersed. As a case study, we examine the current General Urban Development Plan (GUDP of the Bulgarian capital Sofia against the city’s actual development pattern. We observe that the primary goals of the GUDP are to promote a polycentric urban structure and low-density expansion, as well as preserve green edges. While the question of whether and how these goals reflect the sustainability ideal requires further consideration, there are some indications that Sofia’s GUDP may not be effective in encouraging sustainable forms of growth. Substantial inconsistencies exist between the plan’s overall goals and some of its measures and implementation tools. The results on the ground suggest that, despite the plan’s low-density aspirations, Sofia is becoming more compact and densified, while losing its green edges and failing to redirect growth to its northern territories where ample space and opportunities exist. We conclude that employing the achievements of research on sustainability and developing relevant implementation tools such as more effective zoning regulations and viable suburban transportation infrastructure are necessary for realising both the patterns proposed through master planning and achieving sustainable urban growth.

  15. Implementation Plan for the Deep Vadose Zone-Applied Field Research Center

    Energy Technology Data Exchange (ETDEWEB)

    Wellman, Dawn M.; Truex, Michael J.; Freshley, Mark D.; Gephart, Roy E.; Triplett, Mark B.; Johnson, Timothy C.

    2011-02-11

    The Long-Range Deep Vadose Zone Program Plan was published in October 2010. It summarized the U.S. Department of Energy’s (DOE’s) state-of-knowledge about the contaminant remediation challenges facing the deep vadose zone (DVZ) beneath the Central Plateau of the Hanford Site and their approach to solving those challenges. Developing an implementation plan is the next step to address the knowledge and capabilities required to solve DVZ challenges when needed. This multi-year plan (FY-11 through FY-20) identifies the short to long-term research, management, and execution plans required to solve those problems facing the DVZ-Applied Field Research Center (DVZ-AFRC). The schedule supporting implementation overlies existing activities and milestones from Hanford’s DOE-Environmental Management (EM) end-user projects. Success relies upon multi-project teams focused on coordinated subsurface projects undertaken across the DOE Complex combined with facilitated, problem-focused, research investments implemented through the DVZ-AFRC.

  16. A review of the implementation and research strategies of advance care planning in nursing homes.

    Science.gov (United States)

    Flo, E; Husebo, B S; Bruusgaard, P; Gjerberg, E; Thoresen, L; Lillemoen, L; Pedersen, R

    2016-01-21

    Nursing home (NH) patients have complex health problems, disabilities and needs for Advance Care Planning (ACP). The implementation of ACP in NHs is a neglected research topic, yet it may optimize the intervention efficacy, or provide explanations for low efficacy. This scoping review investigates methods, design and outcomes and the implementation of ACP (i.e., themes and guiding questions, setting, facilitators, implementers, and promoters/barriers). A systematic search using ACP MESH terms and keywords was conducted in CINAHL, Medline, PsychINFO, Embase and Cochrane libraries. We excluded studies on home-dwelling and hospital patients, including only specific diagnoses and/or chart-based interventions without conversations. Sixteen papers were included. There were large variations in definitions and content of ACP, study design, implementation strategies and outcomes. Often, the ACP intervention or implementation processes were not described in detail. Few studies included patients lacking decision-making capacity, despite the fact that this group is significantly present in most NHs. The chief ACP implementation strategy was education of staff. Among others, ACP improved documentation of and adherence to preferences. Important implementation barriers were non-attending NH physicians, legal challenges and reluctance to participate among personnel and relatives. ACP intervention studies in NHs are few and heterogeneous. Variation in ACP definitions may be related to cultural and legal differences. This variation, along with sparse information about procedures, makes it difficult to collate and compare research results. Essential implementation considerations relate to the involvement and education of nurses, physicians and leaders.

  17. THE PREMISES OF STRATEGIC MARKETING PLANNING IMPLEMENTATION WITHIN SMALL AND MEDIUM SIZED ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Popescu Andrei

    2011-07-01

    Full Text Available The main purpose of the present paper is to identify the framework and the necessary conditions for the small and medium sized enterprises (SMEs to be able to adopt the strategic marketing planning. Also, the paper aims to underline the importance of the strategic marketing planning and the manner in which the SMEs can adopt, implement and operationalize the strategic marketing planning instruments, whose correct understanding and usage ensure the capacity to generate competitive advantage, the key element both from the perspective of the fierce competition and the perspective of the future development of the SMEs. Within SMEs the implementation of marketing becomes an evident requirment, mostly due to the relationship that these have with the market, thus, leading towards market orientation of the activities, a new approach developed by the marketing vision on managing the activities from these types of organizations. Regarded upon, from the marketing perspective, the activities from the SMEs, especially the marketing activities, cannot take place randomly. Resource allocation, a characteristic of these types of organizations, and the objectives with regards to superior customer needs satisfaction and economic efficiency maximization, claim thorough plannification and deployment of the activities in a sequence that represents the implementation of a strategy previously assumed. Within this framework, the strategic marketing planning appears as a complex process employing all scientific instruments that comprise segmentation, positioning and marketing mix. Utilizing the strategic marketing planning within SMEs depends to further extend on marketing integration; process directly related with a series of factors such as the nature of the market, development stage, product type, management quality and the influences of the marketing department of the SME. The implications onto the marketing activities from SMEs are reflected upon each strategic

  18. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    Science.gov (United States)

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the

  19. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection...

  20. THE PLANNING, PROGRAMING, BUDGETING SYSTEM AND ITS IMPLEMENTATION IN THE SERBIAN MINISTRY OF DEFENSE

    Directory of Open Access Journals (Sweden)

    Sasa RADUSKI

    2010-01-01

    Full Text Available The main purpose of introducing the PPBES to the Serbian Ministry of Defense and the Serbian Armed Forces is to provide a rational management of resources and to maintain and build capacity of the Ministry and the Serbian Armed Forces in order to achieve their goals, objectives and missions.Expected results of implementation of the PPBES are reflected in increasing the efficiency and rationalization of the defense planning to a higher level, ensuring compatibility with defense planning and budgeting system of the state and developing a foundation for the effective management of defense resources.

  1. [Thoughts on how to implement the N'Djamena Plan of Action].

    Science.gov (United States)

    Middleberg, M; Ouedraogo, D

    1990-03-01

    In January 1989 the 9 Sahelian countries adopted the N'Djamena Program of Action (PAN). This article recommends a 5-point strategy for executing the PAN: 1) sensitizing the leaders of countries that are concerned with the demographic aspects of population; 2) formulating national population policies (NPP); 3) implementing NPP among different sectors of the population; 4) estimating the financial resources required to execute the NPP; and 5) creating an organizational infrastructure to implement and evaluate the NPP. The 1st point recommends 3 measures: 1) being committed to all international accords such as the Kilimanjaro Plan of Action; 2) promoting maternal and child health; and 3) promoting economic development with attention to demographic factors. The 2nd point recommends 8 steps: 1) reducing morbidity and mortality; 2) family planning and fertility activities; 3) migration and urbanization; 4) status of women; 5) children and youth; 6) research and training; 7) information about the population and 8) developing institutional affiliations. The 3rd point includes: 1) defining demographic targets; 2) examining alternative approaches to implementing population programs such as a community-based distribution system, social marketing programs and alternative insurance mechanisms and 3) designing a plan of action ranging from 1-3 years. The 4th point includes: 1) analyzing the cost of implementing a program and designing a realistic budget; 2) identifying financial resources; 3) demonstrating the cost-benefit and cost-effectiveness of a population program and 4) evaluating alternative approaches to program cost. The 5th point includes: 1) assigning a role to each organization responsible for implementing a part of the NPP; 2) establishing coordination linkages between public and private agencies responsible for the NPP; 3) avoiding duplication between institutions; 4) training of personnel; 5) assuring efficient utilization of financial resources and personnel; and

  2. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  3. Improving district level health planning and priority setting in Tanzania through implementing accountability for reasonableness framework

    DEFF Research Database (Denmark)

    Maluka, Stephen; Kamuzora, Peter; Sebastián, Miguel San;

    2010-01-01

    In 2006, researchers and decision-makers launched a five-year project - Response to Accountable Priority Setting for Trust in Health Systems (REACT) - to improve planning and priority-setting through implementing the Accountability for Reasonableness framework in Mbarali District, Tanzania....... The objective of this paper is to explore the acceptability of Accountability for Reasonableness from the perspectives of the Council Health Management Team, local government officials, health workforce and members of user boards and committees....

  4. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun; Jia, Xun, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Jiang, Steve B., E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu [Department of Radiation Oncology, University of Texas Southwestern Medical Center, Dallas, Texas 75390 (United States); Peng, Fei [Computer Science Department, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 (United States)

    2015-06-15

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  5. Strategic environmental assessment implementation of transport and mobility plans. The case of Italian regions and provinces

    Directory of Open Access Journals (Sweden)

    Andrea De Montis

    2016-06-01

    Full Text Available Transport and mobility plans imply strategies and actions that affect the environment. The European Union has introduced in 2001 the strategic environmental assessment (SEA to take into account and mitigate adverse environmental effects in planning and decision-making. SEA limited implementation has attracted the interest of many scholars that have sought methods able to assess the quality of SEA processes by identifying vices and virtues in practice. In this paper, we measure the quality of eight SEAs for transport and mobility plans of regional and provincial administrations of Italy. Results show that the overall quality level of SEA reports is only barely sufficient, Abruzzo is among the virtuous and Piedmont among the critical administrations. We also stress that the determination of impact significance has received the worse quality score. We finally compare our results to other Italian and British homologous cases finding interesting and generally confirmative evidences.

  6. Implementation planning and progress on physical activity goals: the mediating role of life-management strategies.

    Science.gov (United States)

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-03-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects. Results from a sample of 131undergraduate students showed that, as a composite, life-management strategies fully mediated the relationship between planning and goal progress. More specifically, decomposing the effects demonstrated that only elective selection and compensation mediated the association between planning and greater progress on a personal physical activity goal. Results are discussed in light of their practical implications and contributions to the personal goal literature.

  7. Design and implementation of motion planning of inspection and maintenance robot for ITER-like vessel

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Hesheng; Lai, Yinping [Department of Automation, Shanghai Jiao Tong University, Shanghai 200240 (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China (China); Chen, Weidong, E-mail: wdchen@sjtu.edu.cn [Department of Automation, Shanghai Jiao Tong University, Shanghai 200240 (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China (China); Cao, Qixin [Institute of Robotics, Shanghai Jiao Tong University, Shanghai 200240 (China)

    2015-12-15

    Robot motion planning is a fundamental problem to ensure the robot executing the task without clashes, fast and accurately in a special environment. In this paper, a motion planning of a 12 DOFs remote handling robot used for inspecting the working state of the ITER-like vessel and maintaining key device components is proposed and implemented. Firstly, the forward and inverse kinematics are given by analytic method. The work space and posture space of this manipulator are both considered. Then the motion planning is divided into three stages: coming out of the cassette mover, moving along the in-vessel center line, and inspecting the D-shape section. Lastly, the result of experiments verified the performance of the motion design method. In addition, the task of unscrewing/screwing the screw demonstrated the feasibility of system in function.

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  9. Plan for the design, development, and implementation, and operation of the National Water Information System

    Science.gov (United States)

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  10. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing

  11. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    Science.gov (United States)

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  12. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    Science.gov (United States)

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  13. Critical success factors for offshoring of enterprise resource planning (ERP implementations

    Directory of Open Access Journals (Sweden)

    Rajneesh Chauhan

    2012-01-01

    Full Text Available Background: In recent years, offshoring enterprise resource planning (ERP implementation has been an emerging trend in the field of offshoring information technology (IT. However, both ERP implementations and IT offshoring are fraught with risks, and when both ERP implementation and IT offshoring happen together, the risks become even more pronounced. Therefore, it is important to understand and identify the issues of ERP implementation in an offshoring situation. Objectives: The purpose of this paper is to highlight the key factors that enable successful offshoring ERP implementation from the client and the vendor perspective. Methods/Approach: The paper uses literature as a basis for identifying a critical success factor, data collected through semi-structured interviews with ERP managers at various levels of the subject organizations, and eventually their analysis. Results: The findings of the paper reveal that various factors are critical while implementing offshoring ERP. They include: offshoring partnership, project management, project team composition, people issues, communications and compliance of the onsite team composition. It is also noticed that ten factors are grouped into three categories: the client side, the vendor side, and both. Conclusions: Organizations are currently undertaking or considering the offshoring ERP implementation particularly from India. This paper will enable them to understand the possible challenges and areas of offshoring the ERP implementation program. The value and originality of the paper comes from the fact that up to now, ERP implementation in offshoring has not been comprehensively explored. This research provides a complete understanding of the critical success factors from the client, the vendor or both the client and the vendor perspective. It also enables researchers to analyse ili rethink ili review offshoring in different service areas.

  14. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  15. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  16. The Implementation of an Interdisciplinary Co-planning Team Model Among Mathematics and Science Teachers

    Science.gov (United States)

    Brown, Michelle Cetner

    In recent years, Science, Technology, Engineering, and Mathematics (STEM) education has become a significant focus of numerous theoretical and commentary articles as researchers have advocated for active and conceptually integrated learning in classrooms. Drawing connections between previously isolated subjects, especially mathematics and science, has been shown to increase student engagement, performance, and critical thinking skills. However, obstacles exist to the widespread implementation of integrated curricula in schools, such as teacher knowledge and school structure and culture. The Interdisciplinary Co-planning Team (ICT) model, in which teachers of different subjects come together regularly to discuss connections between content and to plan larger interdisciplinary activities and smaller examples and discussion points, offers a method for teachers to create sustainable interdisciplinary experiences for students within the bounds of the current school structure. The ICT model is designed to be an iterative, flexible model, providing teachers with both a regular time to come together as "experts" and "teach" each other important concepts from their separate disciplines, and then to bring their shared knowledge and language back to their own classrooms to implement with their students in ways that fit their individual classes. In this multiple-case study, which aims to describe the nature of the co-planning process, the nature of plans, and changes in teacher beliefs as a result of co-planning, three pairs of secondary mathematics and science teachers participated in a 10-week intervention with the ICT model. Each pair constituted one case. Data included observations, interviews, and artifact collection. All interviews, whole-group sessions, and co-planning sessions were transcribed and coded using both theory-based and data-based codes. Finally, a cross-case comparison was used to present similarities and differences across cases. Findings suggest that the

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to

  18. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to

  19. Implementation of an Analytical Model for Leakage Neutron Equivalent Dose in a Proton Radiotherapy Planning System

    Energy Technology Data Exchange (ETDEWEB)

    Eley, John [Department of Radiation Physics, The University of Texas MD Anderson Cancer Center, 1515 Holcombe Blvd., Houston, TX 77030 (United States); Graduate School of Biomedical Sciences, The University of Texas, 6767 Bertner Ave., Houston, TX 77030 (United States); Newhauser, Wayne, E-mail: newhauser@lsu.edu [Department of Physics and Astronomy, Louisiana State University and Agricultural and Mechanical College, 202 Nicholson Hall, Tower Drive, Baton Rouge, LA 70803 (United States); Mary Bird Perkins Cancer Center, 4950 Essen Lane, Baton Rouge, LA 70809 (United States); Homann, Kenneth; Howell, Rebecca [Department of Radiation Physics, The University of Texas MD Anderson Cancer Center, 1515 Holcombe Blvd., Houston, TX 77030 (United States); Graduate School of Biomedical Sciences, The University of Texas, 6767 Bertner Ave., Houston, TX 77030 (United States); Schneider, Christopher [Department of Physics and Astronomy, Louisiana State University and Agricultural and Mechanical College, 202 Nicholson Hall, Tower Drive, Baton Rouge, LA 70803 (United States); Mary Bird Perkins Cancer Center, 4950 Essen Lane, Baton Rouge, LA 70809 (United States); Durante, Marco; Bert, Christoph [GSI Helmholtzzentrum für Schwerionenforschung, Planckstr. 1, Darmstadt 64291 (Germany)

    2015-03-11

    Equivalent dose from neutrons produced during proton radiotherapy increases the predicted risk of radiogenic late effects. However, out-of-field neutron dose is not taken into account by commercial proton radiotherapy treatment planning systems. The purpose of this study was to demonstrate the feasibility of implementing an analytical model to calculate leakage neutron equivalent dose in a treatment planning system. Passive scattering proton treatment plans were created for a water phantom and for a patient. For both the phantom and patient, the neutron equivalent doses were small but non-negligible and extended far beyond the therapeutic field. The time required for neutron equivalent dose calculation was 1.6 times longer than that required for proton dose calculation, with a total calculation time of less than 1 h on one processor for both treatment plans. Our results demonstrate that it is feasible to predict neutron equivalent dose distributions using an analytical dose algorithm for individual patients with irregular surfaces and internal tissue heterogeneities. Eventually, personalized estimates of neutron equivalent dose to organs far from the treatment field may guide clinicians to create treatment plans that reduce the risk of late effects.

  20. Research on Overall Planning and Implementation Evaluation of Land Use of Xinjiang Production and Construction Corps Agriculture-seven Division

    Institute of Scientific and Technical Information of China (English)

    Ru; BAO; Minhua; GAO; Xiaolong; LI

    2013-01-01

    Based on methods for evaluating the overall planning and implementation of land use of domestic scholars, a comprehensive and highly-operable index system and evaluating method for land use planning multi-type implementation has been established through selecting multi-type evaluating indicators and applied to the last-round overall planning of land use in Xinjiang Production and Construction Corps Agriculture-seven Division. The obtained comprehensive score was 86.40, indicating that land use overall planning has been excellently coordinated with land, society, economy as well as ecology and has exerted outstanding effect with the rank as "good". The evaluation results are in accordance with actual conditions, which displays that the established multi-type implementation evaluating system of land use overall planning is reasonable with scientific evaluating methods and can be the reference for evaluation of land use overall planning in other regiments and companies of Xinjiang Production and Construction Corps.

  1. A computational implementation and comparison of several intensity modulated proton therapy treatment planning algorithms.

    Science.gov (United States)

    Li, Haisen S; Romeijn, H Edwin; Fox, Christopher; Palta, Jatinder R; Dempsey, James F

    2008-03-01

    The authors present a comparative study of intensity modulated proton therapy (IMPT) treatment planning employing algorithms of three-dimensional (3D) modulation, and 2.5-dimensional (2.5D) modulation, and intensity modulated distal edge tracking (DET) [A. Lomax, Phys. Med. Biol. 44, 185-205 (1999)] applied to the treatment of head-and-neck cancer radiotherapy. These three approaches were also compared with 6 MV photon intensity modulated radiation therapy (IMRT). All algorithms were implemented in the University of Florida Optimized Radiation Therapy system using a finite sized pencil beam dose model and a convex fluence map optimization model. The 3D IMPT and the DET algorithms showed considerable advantages over the photon IMRT in terms of dose conformity and sparing of organs at risk when the beam number was not constrained. The 2.5D algorithm did not show an advantage over the photon IMRT except in the dose reduction to the distant healthy tissues, which is inherent in proton beam delivery. The influences of proton beam number and pencil beam size on the IMPT plan quality were also studied. Out of 24 cases studied, three cases could be adequately planned with one beam and 12 cases could be adequately planned with two beams, but the dose uniformity was often marginally acceptable. Adding one or two more beams in each case dramatically improved the dose uniformity. The finite pencil beam size had more influence on the plan quality of the 2.5D and DET algorithms than that of the 3D IMPT. To obtain a satisfactory plan quality, a 0.5 cm pencil beam size was required for the 3D IMPT and a 0.3 cm size was required for the 2.5D and the DET algorithms. Delivery of the IMPT plans produced in this study would require a proton beam spot scanning technique that has yet to be developed clinically.

  2. Study protocol for 'we DECide': implementation of advance care planning for nursing home residents with dementia.

    Science.gov (United States)

    Ampe, Sophie; Sevenants, Aline; Coppens, Evelien; Spruytte, Nele; Smets, Tinne; Declercq, Anja; van Audenhove, Chantal

    2015-05-01

    To evaluate the effects of 'we DECide', an educational intervention for nursing home staff on shared decision-making in the context of advance care planning for residents with dementia. Advance care planning (preparing care choices for when persons no longer have decision-making capacity) is of utmost importance for nursing home residents with dementia, but is mostly not realized for this group. Advance care planning consists of discussing care choices and making decisions and corresponds to shared decision-making (the involvement of persons and their families in care and treatment decisions). This quasi-experimental pre-test-post-test study is conducted in 19 nursing homes (Belgium). Participants are nursing home staff. 'We DECide' focuses on three crucial moments for discussing advance care planning: the time of admission, crisis situations and everyday conversations. The 'ACP-audit' assesses participants' views on the organization of advance care planning (organizational level), the 'OPTION scale' evaluates the degree of shared decision-making in individual conversations (clinical level) and the 'IFC-SDM Questionnaire' assesses participants' views on Importance, Frequency and Competence of realizing shared decision-making (clinical level). (Project funded: July 2010). The study hypothesis is that 'we DECide' results in a higher realization of shared decision-making in individual conversations on advance care planning. A better implementation of advance care planning will lead to a higher quality of end-of-life care and more person-centred care. We believe our study will be of interest to researchers and to professional nursing home caregivers and policy-makers. © 2014 John Wiley & Sons Ltd.

  3. Developing a Robust Strategy for Implementing a Water Resources Master Plan in Lima, Peru

    Science.gov (United States)

    Kalra, N.; Groves, D.; Bonzanigo, L.; Molina-Perez, E.

    2015-12-01

    Lima, the capital of Peru, faces significant water stress. It is the fifth largest metropolitan area in Latin America, and the second largest desert city in the world. The city has developed a Master Plan of major investment projects to improve water reliability until 2040. Yet key questions remain. Is the Master Plan sufficient for ensuring reliability in the face of deeply uncertain future climate change and demand? How do uncertain budget and project feasibility conditions shape Lima's options? How should the investments in the plan be prioritized, and can some be delayed? Lima is not alone in facing these planning challenges. Governments invest billions of dollars annually in long-term projects. Yet deep uncertainties pose formidable challenges to making near-term decisions that make long-term sense. The World Bank has spearheaded a community of practice on methods for Decision Making Under Deep Uncertainty (DMU). This pilot project in Peru is the first in-depth application of DMU techniques to water supply planning in a developing country. It builds on prior analysis done in New York, California, and for the Colorado River, yet shows how these methods can be applied in regions which do not have as advanced data or tools available. The project combines three methods in particular -- Robust Decision Making, Decision Scaling, and Adaptive Pathways -- to help Lima implement its Master Plan in a way that is robust, no-regret, and adaptive. It was done in close partnership with SEDAPAL, the water utility company in Lima, and in coordination with other national WRM and meteorological agencies. This talk will: Present the planning challenges Lima and other cities face, including climate change Describe DMU methodologies and how they were applied in collaboration with SEDAPAL Summarize recommendations for achieving long-term water reliability in Lima Suggest how these methodologies can benefit other investment projects in developing countries.

  4. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  5. Implementation of the Every Newborn Action Plan: Progress and lessons learned.

    Science.gov (United States)

    Kinney, Mary V; Cocoman, Olive; Dickson, Kim E; Daelmans, Bernadette; Zaka, Nabila; Rhoda, Natasha R; Moxon, Sarah G; Kak, Lily; Lawn, Joy E; Khadka, Neena; Darmstadt, Gary L

    2015-08-01

    Progress in reducing newborn mortality has lagged behind progress in reducing maternal and child deaths. The Every Newborn Action Plan (ENAP) was launched in 2014, with the aim of achieving equitable and high-quality coverage of care for all women and newborns through links with other global and national plans and measurement and accountability frameworks. This article aims to assess country progress and the mechanisms in place to support country implementation of the ENAP. A country tracking tool was developed and piloted in October-December 2014 to collect data on the ENAP-related national milestones and implementation barriers in 18 high-burden countries. Simultaneously, a mapping exercise involving 47 semi-structured interviews with partner organizations was carried out to frame the categories of technical support available in countries to support care at and around the time of birth by health system building blocks. Existing literature and reports were assessed to further supplement analysis of country progress. A total of 15 out of 18 high-burden countries have taken concrete actions to advance newborn health; four have developed specific action plans with an additional six in process and a further three strengthening newborn components within existing plans. Eight high-burden countries have a newborn mortality target, but only three have a stillbirth target. The ENAP implementation in countries is well-supported by UN agencies, particularly UNICEF and WHO, as well as multilateral and bilateral agencies, especially in health workforce training. New financial commitments from development partners and the private sector are substantial but tracking of national funding remains a challenge. For interventions with strong evidence, low levels of coverage persists and health information systems require investment and support to improve quality and quantity of data to guide and track progress. Some of the highest burden countries have established newborn health

  6. DEVELOPMENT AND IMPROVEMENT OF BUSINESS HIGHER EDUCATION THROUGH IMPLEMENTATION OF STUDENTS LEARNING OUTCOMES ASSESSMENT PLAN (SLOAP

    Directory of Open Access Journals (Sweden)

    Zoran Ivanovski

    2013-03-01

    Full Text Available This study presents new vision how to upgrade business higher education at the Faculty of Economics at University of Tourism and Management in Skopje (UTMS. This paper is result of analyses of best practices of leading higher education institutions as well authors experience in higher education and business education and practice. The UTMS is orientated to introduce best practices and objective standards in order to offer high-quality business education for its students. UTMS has mission for permanent implementation of quality improvement measures as a way to achieve high professional and academic standards and become part of prosperous and respective Universities. In order to achieve this goal, UTMS plan to use additional measures, outcomes assessment as a way to measure institutional effectiveness, as well as effective technique for identifying where changes and improvements are necessary. UTMS has developed Students Learning Outcomes Assessment Plan (SLOAP as a way to reach this goal.Based on permanent analysis of students needs as well as business sector suggestions about desirable level of knowledge, skills and competence of the students from Faculty of Economics, gained from conducted evaluations, UTMS decide to make additional improvement and development of business education. This process have 4 phases: 1 evaluation of students attitude towards curricula and the instructors efficiency, 2preparation of the SLOAP (Student Learning Outcomes Assessment Plan document, 3 implementation of two direct measures from the SLOAP through assessment analysis and action planning, and 4 monitoring changes and improvements made as a result of action planning.The first phase was completed in spring semester 2012, as well as second one with development of Comprehensive Exam and Capstone Course as direct measures. Complete SLOAP also has indirect measures like student satisfaction inventory, course evaluations, alumni, and employers’ surveys, and a

  7. Identification and assessment of site treatment plan implementation opportunities for emerging technologies

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, E.A. [Sandia National Labs., Germantown, MD (United States)

    1995-12-31

    The Department of Energy (DOE), in response to the 1992 Federal Facility Compliance Act, has prepared Site Treatment Plans (STP) for the approximately 2,000 waste streams identified within its mixed waste inventory Concurrently, emerging mixed waste treatment technologies are in final development. This paper defines a three-phase process to identify and assess implementation opportunities for these emerging technologies within the STP. It highlights the first phase, functional matching of expected treatment capabilities with proposed treatment requirements. Matches are based on treatment type, regulated contaminant and waste matrix type, for both capabilities and requirements. Results identify specific waste streams and volumes that could be treated by each emerging technology. A study for Plasma Hearth Process, Delphi DETOX{sup sm}, Supercritical Water Oxidation and Vitrification shows that about 200,000 ml of DOE`s mixed waste inventory can potentially be treated by one or more of these emerging technologies. Actual implementations are small fractions of the treatable inventory. Differences between potential and actual implementations must be minimized to accrue optimum benefit from implementation of emerging or alternative treatment technologies. Functional matching is the first phase in identifying and quantifying benefits, addressing technology system and treatment issues, and providing, in part, the basis for STP implementation decisions. DOE, through EM`s Office of Technology Development, has funded this work.

  8. On the effectiveness in implementing a waste-management-plan method in construction.

    Science.gov (United States)

    Tam, Vivian W Y

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that "Propose methods for on-site reuse of materials" and "Propose methods for reducing waste" are the main benefits gained from the implementation of the WMP method. However, "Low financial incentive" and "Increase in overhead cost" are considered as the major difficulties in the implementation. From that, "Use of prefabricated building components" is considered as the major effective measure to encourage the implementation of the WMP method.

  9. Integration of treatment innovation planning and implementation: strategic process models and organizational challenges.

    Science.gov (United States)

    Lehman, Wayne E K; Simpson, D Dwayne; Knight, Danica K; Flynn, Patrick M

    2011-06-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A two-phase procedural approach is therefore presented based on the integration of Texas Christian University (TCU) models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings.

  10. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    Directory of Open Access Journals (Sweden)

    Ionica Oncioiu

    2014-10-01

    Full Text Available This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitive advantage resulting in innovative products, as well as the effectiveness of companies that use human resources evaluation platform. The need identified on the market to which the SMEs wish to answer by implementing the plan is represented by the nationwide lack of a complex solution covering both the evaluation and the management of human resources performances. The used methodology can be found in the analysis, developing a strategy for preventing financial, human, market, marketing - image risks and also the physical ones. With the SWOT analysis it was observed one of the strengths i.e. the existence of a single management system of employee performance that includes assessment specific features. In conclusion, there are no software solutions at national level, which would assess the human resources of an organization, following specific indicators of that organization, which could combine the assessment methods in order to achieve more a more efficient and versatile assessment.

  11. Implementation intention and planning interventions in Health Psychology: Recommendations from the Synergy Expert Group for research and practice.

    Science.gov (United States)

    Hagger, Martin S; Luszczynska, Aleksandra; de Wit, John; Benyamini, Yael; Burkert, Silke; Chamberland, Pier-Eric; Chater, Angel; Dombrowski, Stephan U; van Dongen, Anne; French, David P; Gauchet, Aurelie; Hankonen, Nelli; Karekla, Maria; Kinney, Anita Y; Kwasnicka, Dominika; Hing Lo, Siu; López-Roig, Sofía; Meslot, Carine; Marques, Marta Moreira; Neter, Efrat; Plass, Anne Marie; Potthoff, Sebastian; Rennie, Laura; Scholz, Urte; Stadler, Gertraud; Stolte, Elske; Ten Hoor, Gill; Verhoeven, Aukje; Wagner, Monika; Oettingen, Gabriele; Sheeran, Paschal; Gollwitzer, Peter M

    2016-07-01

    The current article details a position statement and recommendations for future research and practice on planning and implementation intentions in health contexts endorsed by the Synergy Expert Group. The group comprised world-leading researchers in health and social psychology and behavioural medicine who convened to discuss priority issues in planning interventions in health contexts and develop a set of recommendations for future research and practice. The expert group adopted a nominal groups approach and voting system to elicit and structure priority issues in planning interventions and implementation intentions research. Forty-two priority issues identified in initial discussions were further condensed to 18 key issues, including definitions of planning and implementation intentions and 17 priority research areas. Each issue was subjected to voting for consensus among group members and formed the basis of the position statement and recommendations. Specifically, the expert group endorsed statements and recommendations in the following areas: generic definition of planning and specific definition of implementation intentions, recommendations for better testing of mechanisms, guidance on testing the effects of moderators of planning interventions, recommendations on the social aspects of planning interventions, identification of the preconditions that moderate effectiveness of planning interventions and recommendations for research on how people use plans.

  12. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  13. THE IMPLEMENTATION OF BUTON CULTURAL VALUES IN VALUE EDUCATION PLANNING IN BAUBAU REGION OF SOUTHEAST SULAWESI

    Directory of Open Access Journals (Sweden)

    Nanik Hindaryatiningsih

    2014-03-01

    Full Text Available The study aimed at finding out the implementation of Buton cultural value into value education planning. This study employed qualitative approach by ethnographic method conducted at SMAN 2 Baubau, south east Sulawesi in 2012. For data collection, in-depth interview techniques, documentation review, and participant observation consisting descriptive, focused and selected observation were used. The observation focused on cultural events and interactive behavioral informants. The informants comprised of principal, teachers, staff, school committee, pupils, parents, community leaders and traditional leaders. For data analysis, spradley technique consisting of domain analysis, taxonomy, componential and theme analysis was used. The findings showed that 1 core values in “gau and pombala” culture in Buton community consisted of cooperative, democratic and ethic value; 2 Buton’s cultural values of “gau and pombala’ were practiced in educational value planning at school.

  14. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included.

  15. 77 FR 23619 - Approval and Promulgation of Implementation Plans; Alabama: Removal of State Low-Reid Vapor...

    Science.gov (United States)

    2012-04-20

    ...-Reid Vapor Pressure Requirement for the Birmingham Area AGENCY: Environmental Protection Agency (EPA... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Implementation Plan (SIP), submitted by the Alabama Department of Environmental Management (ADEM), on January 10...

  16. Management of business process design in global implementation of enterprise resource planning systems

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh

    Investments in global enterprise resource planning (ERP) systems are typically carried out as a part of the globalization process in multinational corporations (MNCs). Global ERP systems support integration and control in MNCs in an important way by establishing a common language across an MNC....... As process and data standardization are among the primary drivers of ERP consolidation efforts, business process design is an important concern when implementing global ERP systems. This PhD study addresses three research questions that develop understanding, support, and improvement of the practice...... of business process design in the course of a global ERP implementation in MNCs. In light of existing theoretical and practical challenges, the research questions focus on three business process management (BPM) capabilities: alignment, governance, and method. Drawing on extensive literature reviews...

  17. Case study of open-source enterprise resource planning implementation in a small business

    Science.gov (United States)

    Olson, David L.; Staley, Jesse

    2012-02-01

    Enterprise resource planning (ERP) systems have been recognised as offering great benefit to some organisations, although they are expensive and problematic to implement. The cost and risk make well-developed proprietorial systems unaffordable to small businesses. Open-source software (OSS) has become a viable means of producing ERP system products. The question this paper addresses is the feasibility of OSS ERP systems for small businesses. A case is reported involving two efforts to implement freely distributed ERP software products in a small US make-to-order engineering firm. The case emphasises the potential of freely distributed ERP systems, as well as some of the hurdles involved in their implementation. The paper briefly reviews highlights of OSS ERP systems, with the primary focus on reporting the case experiences for efforts to implement ERPLite software and xTuple software. While both systems worked from a technical perspective, both failed due to economic factors. While these economic conditions led to imperfect results, the case demonstrates the feasibility of OSS ERP for small businesses. Both experiences are evaluated in terms of risk dimension.

  18. Water safety plans. Fundamentals and prospects for implementing them in Colombia

    Directory of Open Access Journals (Sweden)

    Andrea Pérez Vidal

    2010-05-01

    Full Text Available Drinking-water must be free of pathogens, chemicals, impurities and any other pollutant causing human health problems. Latin- America and the Caribbean region present water-quality problems due to deficiencies in operating and maintenance and service continuity, the incorrect operation of water treatment plants and distribution networks and unstable household connection. Global trends in the drinking-water sector are directed towards methodological developments for assessing and managing risk in water- supply systems as a way of protecting public health. Implementing water safety plans (WSP is a practice which is orientated twards ensuring drinking-water quality; its structure is based on multiple-barrier principles, hazard analysis and critical control points (HACCP and systematic management approaches, such as ISO 9001:2000. International experience has shown the be- nefits of implementing WSP as a strategy for ensuring drinking-water quality and protecting public health. Current drinking-water regulations in Colombia require implementing risk mapping and evaluating a quality-index which will enable WSP to have good prospects for their short-term implementation.

  19. IMPLEMENTATION BIRTH PLANNING AND COMPLICATIONS PREVENTIONS PROGRAM (P4K ON COASTAL COMMUNITIES IN MAMUJU

    Directory of Open Access Journals (Sweden)

    Ashriady Ashriady

    2017-01-01

    Full Text Available The results of the 97 countries, there is a significant correlation between aid delivery with maternal mortality (Depkes, 2011. Proportion of birth in Indonesia showed 76.1% in Healthcare Facilities and 23.7% in home and another (Kemenkes RI, 2014. In the coastal community primary choices deliveries take place at home, assisted by shamans because mothers feel safe from evil spirits, and convenient for the family attended (Yunarti, 2013. Scope of delivery assistance by health workers in 2006 - 2011 in West Sulawesi has not reached the target of minimum service standards in 2015 by 90%, obstetric complications handled in 2011 in Mamuju 35.1%. The aim of research to analyze the implementation of Birth Planning and Complications Preventions Program (P4K based on the knowledge and attitude of Mother on Coastal Communities in Mamuju. This type of research is survey with cross sectional study design. In the study period in August-October 2016. The population is all Mother toddler who visited IHC 330, 149 of the samples obtained by using the formula, taken by accidental sampling method. The results showed 68 (81.9% of respondents have sufficient knowledge of the implementation of the less well P4K, 113 (79.6% positive attitude to the implementation mother P4K less good, there is no statistical relationship between knowledge and attitude of mothers with implementation P4K. Midwives need intensive assistance in filling and installation sticker P4K at home mom.

  20. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...