WorldWideScience

Sample records for plan fy 1993-1997

  1. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  2. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  3. Status report 1993-1997 on solar energy research; Statusbericht 1993-1997 Schwerpunkt `Solarenergieforschung`

    Energy Technology Data Exchange (ETDEWEB)

    Fuhs, W; Lux-Steiner, M; Tributsch, H; Willig, F

    1998-09-01

    Solar energy research at the Berlin Hahn-Meitner-Institut (HMI) comprises the following subjects: (a) Silicon thin film solar cells; (b) High-absorption intermediate semiconductors; (c) Photoelectrochemistry and photocatalysis; (d) Injection-type solar cells; (e) Interdisciplinary projects, accompanying materials research and basic research. The 1993 - 1997 status report presents a detailed outline of the projects. [Deutsch] Im Zentrum der Solarenergieforschung des Hahn-Meitner-Instituts (HMI) stehen die folgenden Vorhaben: (a) Duennschichtsolarzellen aus Silizium; (b) Hochabsorbierende Verbindungsleiter; (c) Photoelectrochemie und Photokatalyse; (d) Injektionssolarzellen; (e) Querschnittsaufgaben, begleitende Material- und Grundlagenforschung. Diese Vorhaben werden von Projekten verschiedener Abteilungen getragen. Der vorliegende Statusbericht 1993-1997 gibt eine detaillierte Uebersicht ueber die oben genannten Projekte. (AKF)

  4. Sustainable NREL - Site Sustainability Plan FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  5. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  6. Tanks focus area multiyear program plan - FY96-FY98

    International Nuclear Information System (INIS)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary

  7. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  8. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  9. Institutional Plan, FY1989--FY1994

    International Nuclear Information System (INIS)

    1988-12-01

    This report discusses future plans of the Stanford Linear Accelerator Center. Topics covered are: Laboratory Mission; Special Issues; Laboratory Strategic View; Scientific Program at SLAC; Initiatives; Education and Technology Transfer Programs; Site and Facilities; and Resource Projections. 9 tabs

  10. Institutional plan FY 1998--FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

  11. Audit and Evaluation Plan FY 2002

    National Research Council Canada - National Science Library

    2002-01-01

    .... These projects also have been coordinated in the joint audit and inspection planning groups that address coverage in each major functional area. The plan also includes audit policy and oversight projects planned to start in FY 2002; however, intelligence coverage will be addressed separately.

  12. Institutional plan FY 2004 - FY 2008

    International Nuclear Information System (INIS)

    Beggs, S. D.

    2004-01-01

    Argonne's mission is to serve DOE and national security by advancing the frontiers of knowledge, by creating and operating forefront scientific user facilities, and by providing innovative and effective approaches and solutions to energy, environmental, and security challenges to national and global well-being, in the near and long term, as a contributing member of the DOE laboratory system. We contribute significantly to DOE's mission in science, energy resources, environmental stewardship, and national security, with lead roles in the areas of science, operation of scientific facilities, and energy. In accomplishing our mission, we partner with DOE, other federal laboratories and agencies, the academic community, and the private sector. Argonne is pursuing ten visionary strategic goals to deliver extraordinary science and technology with significant value to the nation: (1) Develop the technologies and infrastructure needed to produce, store, and distribute hydrogen fuel. (2) Close the nuclear fuel cycle, reducing the cost of nuclear waste disposal by billions of dollars and disposing of weapons-grade plutonium and actinides. (3) Develop advanced nuclear power technologies that are safe, economical, proliferation-resistant, and environmentally sustainable. (4) Plan, design, construct, and operate the Rare Isotope Accelerator (RIA) and make fundamental discoveries in nuclear physics and astrophysics. (5) Construct and operate the Center for Nanoscale Materials and create innovative materials with valuable commercial properties. (6) Lead the Genomes to Life team that focuses on protein production and related proteomics; implement computational biology to build fundamental understanding of living systems. (7) Realize the full potential of scientific simulation to solve mission-related problems, through leading-edge research on systems architecture and software, parallel programming and numerical tools, distributed computing, and computational science applications

  13. Oak Ridge National Laboratory Institutional Plan FY 1984-FY 1989

    International Nuclear Information System (INIS)

    1983-11-01

    In this plan, Oak Ridge National Laboratory (ORNL) continues to be committed to scientific and technological research that is based on technical excellence and innovation and that provides a foundation for and a stimulus to broader and more sustained economic growth. DOE is being asked to assist in establishing a new program for Laboratory cooperation with industry, beginning with an initial focus on materials science. The current Institutional Plan thus projects growth in the materials science area as well as in other basic physical science areas and suggests a new initiative designed to extend the various technology transfer activities and to make them more effective by using ORNL as the trial Laboratory for some of these different approaches. This Institutional Plan projects a stable future for ORNL, with only modest amounts of growth in selected areas of research for the FY 1984-FY 1989 planning cycle. Summaries of the overall picture of the proposed budget and personnel levels for the current planning cycle are included. Scientific programs, laboratory resource development, and private sector interactions are discussed

  14. FY1983 HTGR summary level program plan

    International Nuclear Information System (INIS)

    1983-01-01

    The major focus and priority of the FY1983 HTGR Program is the development of the HTGR-SC/C Lead Project through one of the candidate lead utilities. Accordingly, high priority will be given to work described in WBS 04 for site and user specific studies toward the development of the Lead Project. Asessment of advanced HTGR systems will continue during FY1983 in accordance with the High Temperature Process Heat (HTPH) Concept Evaluation Plan. Within the context of that plan, the assessment of the monolithic HTPH concepts has been essentially completed in FY1982 and FY1983 activities and will be limited to documentation only. the major advanced HTGR systems efforts in FY1983 will be focused on the further definition of the Modular Reactor Systems concepts in both the reforming (MRS-R) and Steam Cycle/Cogeneration 9MRS-SC/C) configurations in WBS 41. The effort will concentrate upon key technical issues and trade studies oriented to reduction in expected cost and schedule duration. With regard to the latter, the most significant will be trade study addressing the degree of modularization of reactor plant structures. particular attention will be given to the confinement building which currently defines the critical path for construction

  15. FY16-20 Strategic Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harwell, Amber Suzanne [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2015-07-01

    Welcome to our FY16–FY20 Strategic Plan, which both refects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories’ strategic framework to our future. This document is the result of the leadership team’s journey over the past few years in response to the needs of our nation. In an external environment that continues to change, sometimes in unexpected ways, it is critical that our mission areas and our foundation become increasingly synergistic, forming a whole whose parts are interdependent.

  16. Termo technology programme. Final report 1993-1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The TERMO-technology programme was realised in 1993-1997. The aim of the programme was to promote the profitability and sustainable development of district heating by means of research and development actions. The programme included 36 research projects that were distributed to four research areas. These included heat distribution, metering, information and control systems, the economy of district heating as well as system development. The costs totaled to FIM 12 million. The programme was financed by the participating companies and the Technology Development Centre TEKES. Around eighty Finnish companies and institutions participated in the programme. In addition, the programme participated in international research cooperation in the framework of the Nordic Council of Ministers and the International Energy Agency programmes. The research area Heat Distribution included projects on rehabilitation and status control of district heating networks, pumping, thermal stresses in district heating pipes, material questions, water treatment, steam pipe systems as well as drag reducing additives in district heating water. The research area Metering, Information and Control Systems included projects on forecasts of district heating load, calibration of flow meters, heat cost allocation in buildings, control systems and their qualifications in buildings and improved cooling of district heating water in the consumer equipment. The research area Economy included projects on determination of subscribed heat demand, pricing methods of district heating, success factors of energy companies as well as long term prospects of district heating in Finland. The research area System Development included projects on changing heat loads, district cooling as well as combined heat and power production. After the TERMO programme joint efforts will be continued for the development of district heating technology. The emphasis will be to improve the feasibility of combined heat and power

  17. Human Factors Regulatory Research Program Plan, FY 1989--FY 1992

    International Nuclear Information System (INIS)

    Coffman, F.; Persensky, J.; Ryan, T.; Ramey-Smith, A.; Goodman, C.; Serig, D.; Trager, E; Nuclear Regulatory Commission, Washington, DC; Nuclear Regulatory Commission, Washington, DC; Nuclear Regulatory Commission, Washington, DC

    1989-10-01

    This report describes the currently ongoing (FY 1989) and planned (FY 1989-1992) Human Factors Regulatory Research Program in the NRC Office of Nuclear Regulatory Research (RES). Examples of the influence of human factors on nuclear safety are presented, and the role of personnel is discussed. Current regulatory issues associated with human factors in the nuclear system and the purpose of the research plan are provided. The report describes the research process applied to the human factors research issues and the program activities: Personnel Performance Measurement, Personnel Subsystem, Human-System Interface. Organization and Management, and Reliability Assessment. The research being conducted within each activity is summarized along with the objectives, background information, and expected regulatory products. Budget and personnel forecasts are provided along with a summary of contractors performing some of the ongoing research. Appendices contain a chronology of human factors research at NRC, a description of the research approach, an update on human factors programs and initiatives in RES and other NRC offices, and the integration among these programs. 46 refs., 5 tabs

  18. Biofuels Program Plan, FY 1992--FY 1996. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    This five-year program plan describes the goals and philosophy of the US Department of Energy`s (DOE) Biofuels Systems Division (BSD) program and the BSD`s major research and development (R&D) activities for fiscal years (FY) 1992 through 1996. The plan represents a consensus among government and university researchers, fuel and automotive manufacturers, and current and potential users of alternative fuels and fuel additives produced from biomass. It defines the activities that are necessary to produce versatile, domestic, economical, renewable liquid fuels from biomass feedstocks. The BSD program focuses on the production of alternative liquid fuels for transportation-fuels such as ethanol, methanol, biodiesel, and fuel additives for reformulated gasoline. These fuels can be produced from many plant materials and from a significant portion of the wastes generated by municipalities and industry. Together these raw materials and wastes, or feedstocks, are called biomass.

  19. Institutional plan. FY 1997-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  20. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  1. FY95 software project management plan: TMACS, CASS computer systems

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule

  2. Argonne National Laboratory institutional plan FY 2002 - FY 2007

    International Nuclear Information System (INIS)

    Beggs, S. D.

    2001-01-01

    The national laboratory system provides a unique resource for addressing the national needs inherent in the mission of the Department of Energy. Argonne, which grew out of Enrico Fermi's pioneering work on the development of nuclear power, was the first national laboratory and, in many ways, has set the standard for those that followed. As the Laboratory's new director, I am pleased to present the Argonne National Laboratory Institutional Plan for FY 2002 through FY 2007 on behalf of the extraordinary group of scientists, engineers, technicians, administrators, and others who re responsible for the Laboratory's distinguished record of achievement. Like our sister DOE laboratories, Argonne uses a multifaceted approach to advance U.S. R and D priorities. First, we assemble interdisciplinary teams of scientists and engineers to address complex problems. For example, our initiative in Functional Genomics will bring together biologists, computer scientists, environmental scientists, and staff of the Advanced Photon Source to develop complete maps of cellular function. Second, we cultivate specific core competencies in science and technology; this Institutional Plan discusses the many ways in which our core competencies support DOE's four mission areas. Third, we serve the scientific community by designing, building, and operating world-class user facilities, such as the Advanced Photon Source, the Intense Pulsed Neutron Source, and the Argonne Tandem-Linac Accelerator System. This Plan summarizes the visions, missions, and strategic plans for the Laboratory's existing major user facilities, and it explains our approach to the planned Rare Isotope Accelerator. Fourth, we help develop the next generation of scientists and engineers through educational programs, many of which involve bright young people in research. This Plan summarizes our vision, objectives, and strategies in the education area, and it gives statistics on student and faculty participation. Finally, we

  3. Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  4. Oak Ridge National Laboratory institutional plan, FY 1992--FY 1997

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    In operation for fifty years, the Oak Ridge National Laboratory (ORNL) is managed by Martin Marietta Energy Systems, Inc., for the US Department of Energy (DOE). ORNL is one of DOE's major multiprogram national laboratories. Activities at the Laboratory are focused on basic and applied research, on technology development, and on other technological challenges that are important to DOE and to the nation. The Laboratory also performs research and development (R D) for non-DOE sponsors when such activities complement DOE missions and address important national or international issues. The Laboratory is committed to the pursuit of excellence in all its activities, including the commitment to carry out its missions in compliance with environmental, safety, and health laws and regulations. The principal elements of the Laboratory's missions in support of DOE include activities in each of the following areas: (1) Energy production and conservation technologies; (2) physical and life sciences; (3) scientific and technical user facilities; (4) environmental protection and waste management; (5) science technology transfer; and, (6) education. This institutional plan for ORNL activities is for the next five years: FY 1992--1997.

  5. Twenty-Five Year Site Plan FY2013 - FY2037

    Energy Technology Data Exchange (ETDEWEB)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual

  6. FY 2017 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2016-11-30

    For more than 50 years, the United States (U.S.) Department of Energy’s (DOE’s) Pacific Northwest National Laboratory (PNNL) has advanced the frontiers of science and technology through courageous discovery and innovation. Our multidisciplinary team of more than 4,400 scientists, engineers, and support professionals is tackling global sustainability challenges in our science, energy, environmental, and security missions. For example, our research on how human and natural systems interact is critical to informing sustainable solutions to the nation’s energy and environmental challenges. PNNL is equally committed to sustainability right here at home, and we are making excellent progress toward the goals described in this plan. We are working on ongoing challenges, such as reducing the energy required to meet our research mission and promoting conservation among our employees.

  7. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  8. Engaging "Gangland" Visual Culture: Memorializing Beltzhoover's Victims of Violence, 1993-1997

    Science.gov (United States)

    Bey, Sharif

    2012-01-01

    This autoethnographic study contextualizes gangland visual culture (graffiti, tattoos, public/private shrines) in order to illustrate how young African American males memorialized victims of violence between the years 1993-1997 in Beltzhoover, an inner city African American community on Pittsburgh's Southside. The author, a former resident of the…

  9. 75 FR 15686 - NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Science.gov (United States)

    2010-03-30

    ...-01] NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015 AGENCY... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of availability and request for public comment. [[Page 15687

  10. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  11. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  12. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  13. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    Energy Technology Data Exchange (ETDEWEB)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  14. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  15. National Ignition Facility (NIF) FY2015 Facility Use Plan

    Energy Technology Data Exchange (ETDEWEB)

    Folta, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wisoff, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-18

    Major features of the FY2015 NIF Use Plan include: • Performing a record number of layered DT experiments with 28 planned compared with 15 in FY2014. Executing the first plutonium experiments on the NIF in support of the Science Campaigns. • Over 300 targets shots, a 57% increase compared to FY14. This is a stretch goal defined in the 120-Day Study document, and relies upon the success of many shot-rate improvement actions, as well as on the distribution of shot type selected by the users. While the Plan is consistent with this goal, the increased proportion of layered DT experiments described above reduces the margin against this goal. • Commissioning of initial ARC capability, which will support both SSP-HED and SSPICF programs. • Increase in days allocated to Discovery Science to a level that supports an ongoing program for academic use of NIF and an annual solicitation for new proposals. • Six Facility Maintenance and Reconfiguration (FM&R) periods totaling 30 days dedicated to major facility maintenance and modifications. • Utilization of the NIF Facility Advisory Schedule Committee (FASC) to provide stakeholder review and feedback on the NIF schedule. The Use Plan assumes a total FY2015 LLNL NIF Operations funding in MTE 10.7 of $229.465M and in MTE 10.3 of 47.0M. This Use Plan will be revised in the event of significant changes to the FY2015 funding or if NNSA provides FY2016 budget guidance significantly reduced compared to FY2015.

  16. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  17. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  18. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Beggs, S.D.

    2000-12-07

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes

  19. Long-Range Research Plan, FY 1985-FY 1989

    International Nuclear Information System (INIS)

    1984-09-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. This document is divided into the following sections: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; advanced concepts; radiation protection and health effects; and waste management. The following are also listed as appendices: unresolved safety issues and TMI action plan items, priorities for research program, research program outline, and research utilization report. A glossary of acronyms is included

  20. Research and development strategic plan : FY2013-FY2017.

    Science.gov (United States)

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  1. Long-range research plan: FY 1984-FY 1988

    International Nuclear Information System (INIS)

    1982-08-01

    Information is presented concerning planned research activities related to LOCA and transients; LOFT; accident evaluation and mitigation; LMFBR and HTGR type reactors; facility operations and safeguards; waste management; siting and environment; and system and reliability analysis

  2. A plan for administrative computing at ANL FY1991 through FY1993

    Energy Technology Data Exchange (ETDEWEB)

    Caruthers, L.E. (ed.); O' Brien, D.E.; Bretscher, M.E.; Hischier, R.C.; Moore, N.J.; Slade, R.G.

    1990-10-01

    In July of 1988, Argonne National Laboratory management approved the restructuring of Computing Services into the Computing and Telecommunications Division, part of the Physical Research area of the Laboratory. One major area of the Computing and Telecommunications Division is Management Information Systems (MIS). A significant aspect of Management Information Systems' work is the development of proposals for new and enhanced administrative computing systems based on an analysis of informational needs. This document represent the outcome of the planning process for FY1991 through FY1993. The introduction of the FY1991 through FY1993 Long-Range Plan assesses the state of administrative computing at ANL and the implications of FY1991 funding recommendations. It includes a history of MIS planning for administrative data processing. This document discusses the strategy and goals which are an important part of administrative data processing plans for the Laboratory. It also describes the management guidelines established by the Administrative Data Processing Oversight Committee for the proposal and implementation of administrative computing systems. Summaries of the proposals for new or enhanced administrative computing systems presented by individual divisions or departments with assistance of Management Information Systems, to the Administrative Data Processing Oversight Committee are given. The detailed tables in this paper give information on how much the resources to develop and implement a given systems will cost its users. The tables include development costs, computing/operations costs, software and hardware costs, and efforts costs. They include both systems funded by Laboratory General Expense and systems funded by the users themselves.

  3. Institutional Plan, FY 1993--1998, Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-01-01

    This document presents the plans and goals of the Idaho National Engineering Laboratory for FY 1993--1998. Areas discussed in this document include: INEL strategic view; initiatives; scientific and technical programs; environmental, safety, and health management, technology transfer, science and math education, and community affairs; human resources; site and facilities; and resource projections

  4. Oak Ridge National Laboratory Institutional Plan, FY 1997--FY 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    Three major initiatives are described, which are proposed to strengthen ORNL`s ability to support the missions of the Department: neutron science, functional genomics, and distributed computing at teraflop speeds. The laboratory missions, strategic plan, scientific and technical programs, enterprise activities, laboratory operations, and resource projections are also described.

  5. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  6. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  7. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  8. Brookhaven National Laboratory Institutional Plan FY2001--FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.

    2000-10-01

    Brookhaven National Laboratory is a multidisciplinary laboratory in the Department of Energy National Laboratory system and plays a lead role in the DOE Science and Technology mission. The Laboratory also contributes to the DOE missions in Energy Resources, Environmental Quality, and National Security. Brookhaven strives for excellence in its science research and in facility operations and manages its activities with particular sensitivity to environmental and community issues. The Laboratory's programs are aligned continuously with the goals and objectives of the DOE through an Integrated Planning Process. This Institutional Plan summarizes the portfolio of research and capabilities that will assure success in the Laboratory's mission in the future. It also sets forth BNL strategies for our programs and for management of the Laboratory. The Department of Energy national laboratory system provides extensive capabilities in both world class research expertise and unique facilities that cannot exist without federal support. Through these national resources, which are available to researchers from industry, universities, other government agencies and other nations, the Department advances the energy, environmental, economic and national security well being of the US, provides for the international advancement of science, and educates future scientists and engineers.

  9. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  10. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO 3 plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996)

  11. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  12. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  13. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  14. EDISON - research programme on electricity distribution automation 1993-1997. Interim report 1996

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M. [ed.] [VTT Energy, Espoo (Finland). Energy Systems

    1997-12-31

    The report comprises a summary of the results of the first four years of the research programme EDISON on distribution automation in Finnish utilities. The five year research programme (1993-1997) is conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of the funding is from the Technology Development Centre TEKES and from manufacturing companies. The goal of the research programme is to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer associated automation functions. In addition, the techniques for demand side management are developed and integrated into the automation scheme. The final aim is to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of fifteen projects are now given. These results should be considered intermediate, since most projects will be continued in 1997. (orig.) 43 refs.

  15. EDISON - research programme on electricity distribution automation 1993-1997. Interim report 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M. [ed.] [VTT Energy, Espoo (Finland). Energy Systems

    1996-12-31

    The report comprises a summary of the results of the first three years of the research programme EDISON on distribution automation in Finnish electrical utilities. The five year research programme (1993-1997) is conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of funding is from the Technology Development Centre (Tekes) and from manufacturing companies. The goal of the research programme is to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer automation functions. In addition, the techniques for demand side management are developed and integrated into the automation scheme. The final aim is to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of thirteen projects are now given. These results should be considered intermediate, since most projects will be continued in 1996. (orig.)

  16. EDISON - research programme on electric distribution automation 1993-1997. Final report 1997

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M [ed.; VTT Energy, Espoo (Finland). Energy Systems

    1998-08-01

    This report comprises a summary of the results of the five year research programme EDISON on distribution automation in Finnish utilities. The research programme (1993 - 1997) was conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of the funding has been from the Technology Development Centre TEKES and from manufacturing companies. The goal of the research programme was to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer associated automation functions. In addition, the techniques for demand side management were developed and integrated into the automation scheme. The final aim was to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of nineteen projects are given in this report

  17. EDISON - research programme on electricity distribution automation 1993-1997. Interim report 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M [ed.; VTT Energy, Espoo (Finland). Energy Systems

    1997-12-31

    The report comprises a summary of the results of the first three years of the research programme EDISON on distribution automation in Finnish electrical utilities. The five year research programme (1993-1997) is conducted under the leadership of VTT Energy, in cooperation with universities, distribution companies and the manufacturing industry. The main part of funding is from the Technology Development Centre (Tekes) and from manufacturing companies. The goal of the research programme is to develop a new scheme for a complete distribution automation system, including the network automation, computer systems in the control centre and the customer automation functions. In addition, the techniques for demand side management are developed and integrated into the automation scheme. The final aim is to demonstrate the automation functions and systems of the scheme in real distribution systems. The results of thirteen projects are now given. These results should be considered intermediate, since most projects will be continued in 1996. (orig.)

  18. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF VETERANS AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans... Affairs (VA) is announcing the availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan... Act of 2010 (GPRAMA) (Pub. L. 111-352). The Strategic Plan provides the Department's long-term...

  19. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  20. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  1. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  2. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  3. Institutional plan. FY 1998--2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

  4. Sandia National Laboratories Institutional Plan: FY 1999-2004

    Energy Technology Data Exchange (ETDEWEB)

    Garber, D.P.

    1999-01-06

    This Institutional Plan is the most comprehensive yearly "snapshot" available of Sandia National Laboratories' major programs, facilities, human resources, and budget. The document also includes overviews of our missions, organization, capabilities, planning functions, milestones, and accomplishments. The document's purpose is to provide the above information to the US Department of Energy, key congressional committees, Sandia management, and other present and potential customers. Chapter 2 presents information about Sandia's mission and summarizes our recent revision of Sandia's Strategic Plan. Chapter 3 presents an overview of Sandia's strategic objectives, chapter 4 lists laboratory goals and milestones for FY 1999, and chapter 5 presents our accomplishments during FY 1998. Chapters 3 through 5 are organized around our eight strategic objectives. The four primary objectives cover nuclear weapons responsibilities, nonproliferation and materials control, energy and critical infrastructures, and emerging national security threats. The major programmatic initiatives are presented in chapter 7. However, the programmatic descriptions in chapter 6 and the Associated funding tables in chapter 9 continue to be presented by DOE Budget and Reporting Code, as in previous Sandia institutional plans. As an aid to the reader, the four primary strategic objectives in chapter 3 are cross-referenced to the program information in chapter 6.

  5. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  6. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  7. Nevada nuclear waste storage investigations: FY 1980 Project Plan and FY 1981 forecast

    International Nuclear Information System (INIS)

    1980-02-01

    The DOE is responsible for developing or improving the technology for safely and permanently isolating radioactive wastes from the biosphere. The National Waste Terminal Storage Program, which is a part of the US Nuclear Waste Management Program, is concerned with disposing of the high-level wastes associated with DOE and commercial nuclear reactor fuel cycles. The DOE/NV has been delegated the responsibility to evaluate the geohydrologic setting and underground rock masses of the Nevada Test Site (NTS) area to determine whether a suitable site exists for constructing a repository for isolating highly radioactive solid wastes. Accordingly, the Nevada Nuclear Waste Storage Investigations (NNWSI) were established by NV to conduct these evaluations. The NNWSI are managed by the DOE/NV, but the field and laboratory investigations are being performed by scientific investigators from several organizations. The four primary organizations involved are: Los Alamos Scientific Laboratory (LASL), Lawrence Livermore Laboratory (LLL), Sandia Laboratories (SL), and the US Geological Survey (USGS). DOE/NV is responsible for coordinating these investigations. This document presents the Project Plan for the NNWSI for FY 1980 and forecasts activities for FY 1981. Each task is divided into subtasks and described. This Plan is subject ot periodic review and revision by the DOE/NV. Changes will be addressed as they occur in NNWSI Quarterly Reports. This document also presents information on the Project's technical approach as well as its history, organization, and management

  8. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  9. 78 FR 15960 - Request for Information on the FY 2013-2018 Strategic Plan for the Office of Disease Prevention

    Science.gov (United States)

    2013-03-13

    ... Office has embarked on an extensive planning process to develop a strategic plan for FY 2013-2018... the FY 2013-2018 Strategic Plan for the Office of Disease Prevention SUMMARY: The purpose of this Request for Information (RFI) is to seek broad public input on the Fiscal Year (FY) 2013-2018 Strategic...

  10. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  11. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  12. Institutional Plan, FY 1995--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    Sandia recently completed an updated strategic plan, the essence of which is presented in chapter 4. Sandia`s Strategic Plan 1994 takes its direction from DOE`s Fueling a Competitive Economy: Strategic Plan and provides tangible guidance for Sandia`s programs and operations. Although it is impossible to foresee precisely what activities Sandia will pursue many years from now, the strategic plan makes one point clear: the application of our scientific and engineering skills to the stewardship of the nation`s nuclear deterrent will be central to our service to the nation. We will provide the necessary institutional memory and continuity, experience base, and technical expertise to ensure the continued safety, security, and reliability of the nuclear weapons stockpile. As a multiprogram laboratory, Sandia will also continue to focus maximum effort on a broad spectrum of other topics consistent with DOE`s enduring core mission responsibilities: Defense (related to nuclear weapons), Energy, Environment (related to waste management and environmental remediation), and Basic Science.

  13. LBNL Institutional Plan, FY 1996--2001. Draft

    International Nuclear Information System (INIS)

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy's strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory's scientific and support divisions

  14. LBNL Institutional Plan, FY 1996--2001. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  15. INEEL Institutional Plan - FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Enge, Ray Stevenson

    1999-11-01

    In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R&D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex - the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this Institutional Plan will offer additional content and resource refinements.

  16. INEEL Institutional Plan - FY 2000-2004

    International Nuclear Information System (INIS)

    Enge, Ray Stevenson

    1999-01-01

    In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this Institutional Plan will offer additional content and resource refinements

  17. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  18. Thermal Stabilization FY 1999 blend plan

    Energy Technology Data Exchange (ETDEWEB)

    RISENMAY, H.R.

    1999-02-23

    This Blend Plan documents the alternate feed material items for the thermal stabilization process that will be used in place of the metal items that were originally planned to be processed. Problems with resolution of the safety basis for the metal items resulted in the decision to run material that already had an established safety basis. Various in process and scrap recovery items stored in gloveboxes, plutonium oxide and plutonium oxide mixed with uranium oxide stored in 2736-Z vaults will be processed through the stabilization furnaces until the safety basis for the metal items has been resolved. The purpose of thermal stabilization is to heat the material to 1000 degrees Celsius to drive off all volatile materials and leave the plutonium and/or uranium as oxides. The stabilized material will be sampled to determine the Loss On Ignition (LOI). The stabilized material must meet LOI of less than 0.5% to be acceptable for storage under DOE-STD-3013-94 specifications. Out of specification material will be recycled through the furnaces until the LOI limits are met.

  19. Thermal Stabilization FY 1999 blend plan

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Blend Plan documents the alternate feed material items for the thermal stabilization process that will be used in place of the metal items that were originally planned to be processed. Problems with resolution of the safety basis for the metal items resulted in the decision to run material that already had an established safety basis. Various in process and scrap recovery items stored in gloveboxes, plutonium oxide and plutonium oxide mixed with uranium oxide stored in 2736-Z vaults will be processed through the stabilization furnaces until the safety basis for the metal items has been resolved. The purpose of thermal stabilization is to heat the material to 1000 degrees Celsius to drive off all volatile materials and leave the plutonium and/or uranium as oxides. The stabilized material will be sampled to determine the Loss On Ignition (LOI). The stabilized material must meet LOI of less than 0.5% to be acceptable for storage under DOE-STD-3013-94 specifications. Out of specification material will be recycled through the furnaces until the LOI limits are met

  20. Thermal stabilization FY 1999 blend plan

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Blend Plan documents the alternate feed material items for the thermal stabilization process that will be used in place of the metal items that were originally planned to be processed. Problems with resolution of the safety basis for the metal items resulted in the decision to run material that already had an established safety basis. Various in process and scrap recovery items stored in gloveboxes, plutonium oxide and plutonium oxide mixed with uranium oxide stored in 2736-2 vaults will be processed through the stabilization furnaces until the safety basis for the metal items has been resolved. The purpose of thermal stabilization is to heat the material to 1000 degrees Celsius to drive off all volatile materials and leave the plutonium and/or uranium as oxides. The stabilized material will be sampled to determine the Loss On Ignition (LOI). The stabilized material must meet LOI of less than 0.5% to be acceptable for storage under DOE-STD-3013-94 specifications. Out of specification material will be recycled through the furnaces until the LOI limits are met

  1. Thermal stabilization FY 1999 blend plan

    Energy Technology Data Exchange (ETDEWEB)

    RISENMAY, H.R.

    1999-06-01

    This Blend Plan documents the alternate feed material items for the thermal stabilization process that will be used in place of the metal items that were originally planned to be processed. Problems with resolution of the safety basis for the metal items resulted in the decision to run material that already had an established safety basis. Various in process and scrap recovery items stored in gloveboxes, plutonium oxide and plutonium oxide mixed with uranium oxide stored in 2736-2 vaults will be processed through the stabilization furnaces until the safety basis for the metal items has been resolved. The purpose of thermal stabilization is to heat the material to 1000 degrees Celsius to drive off all volatile materials and leave the plutonium and/or uranium as oxides. The stabilized material will be sampled to determine the Loss On Ignition (LOI). The stabilized material must meet LOI of less than 0.5% to be acceptable for storage under DOE-STD-3013-94 specifications. Out of specification material will be recycled through the furnaces until the LOI limits are met.

  2. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  3. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  4. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    Energy Technology Data Exchange (ETDEWEB)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R&D) demonstrations, non-INEL R&D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document.

  5. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    International Nuclear Information System (INIS)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R ampersand D) demonstrations, non-INEL R ampersand D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document

  6. Test plan for FY-94 digface characterization field experiments

    International Nuclear Information System (INIS)

    Josten, N.E.; Roybal, L.G.

    1994-08-01

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL's Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal

  7. Arctic Research Plan: FY2017-2021

    Science.gov (United States)

    Starkweather, Sandy; Jeffries, Martin O; Stephenson, Simon; Anderson, Rebecca D.; Jones, Benjamin M.; Loehman, Rachel A.; von Biela, Vanessa R.

    2016-01-01

    The United States is an Arctic nation—Americans depend on the Arctic for biodiversity and climate regulation and for natural resources. America’s Arctic—Alaska—is at the forefront of rapid climate, environmental, and socio-economic changes that are testing the resilience and sustainability of communities and ecosystems. Research to increase fundamental understanding of these changes is needed to inform sound, science-based decision- and policy-making and to develop appropriate solutions for Alaska and the Arctic region as a whole. Created by an Act of Congress in 1984, and since 2010 a subcommittee of the National Science and Technology Council (NSTC) in the Executive Office of the President, the Interagency Arctic Research Policy Committee (IARPC) plays a critical role in advancing scientific knowledge and understanding of the changing Arctic and its impacts far beyond the boundaries of the Arctic. Comprising 14 Federal agencies, offices, and departments, IARPC is responsible for the implementation of a 5-year Arctic Research Plan in consultation with the U.S. Arctic Research Commission, the Governor of the State of Alaska, residents of the Arctic, the private sector, and public interest groups.

  8. Buried waste integrated demonstration FY 94 deployment plan

    International Nuclear Information System (INIS)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document

  9. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  10. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  11. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.

  12. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.; Olson, Karl R.; Grether, Donald F.; Clary, Mary M.; Smith, Brian M.; Stevens, David F.; Ross, Loren; Alper, Mark D.; Dairiki, Janis M.; Fong, Pauline L.; Bartholomew, James C.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.

  13. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.

  14. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  15. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  16. FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1991-10-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs

  17. Department of Defense Strategic Sustainability Performance Plan FY 2012

    Science.gov (United States)

    2012-01-01

    interoperability of equipment; and the management and oversight of contingency basing. Improved contingency base sustainability will also enhance mission...with communicating classified information from alternate work locations. In FY 2011, NGA developed and began implementing a telecommuting policy...operating procedures. DLA Disposition Services strengthened its oversight of the electronics demanufacturing process in FY 2011 by tightening

  18. Los Alamos Waste Management FY96 and FY97 Tactical Plan, March 1, 1996

    International Nuclear Information System (INIS)

    1996-01-01

    The Los Alamos National Laboratory (LANL) Waste Management Program (WMP) began a transition to become a open-quotes best of classclose quotes waste management program during fiscal year 1995 (FY95). A best of class waste management program means that LANL will provide cost-effective and compliant management of the minimum amount of waste. In FY94, the WMP could be characterized as a level of effort program requiring several new facilities and new LANL-developed technologies to carry out its waste management responsibilities. By the end of FY95, significant progress had been made in the transition to best of class. The FY96 WMP is realigned and reorganized. Its budget and scope of work are built upon discrete work packages. It is committed to achieving improved cost-effectiveness, providing significant tangible technical results, and to having its performance measured. During FY95, over $11,000,000 in facility and operational costs were avoided. The need for three new major facilities was reexamined and lower cost solutions, not requiring the development of new facilities, were agreed to. Technology development activities were terminated and replaced with the use of commercial facilities to achieve aggressive reductions in the Low-Level Mixed Waste legacy inventory. In addition, over $14,000,000 in improved cost-effectiveness has been included in the FY96 Baseline. An overall WMP vision, specific milestones, performance measures, and commitments are in place for FY96 to ensure that LANL continues the transition to a best of class waste management program. The following table identifies the overall vision and success indicators for FY96

  19. 76 FR 13353 - Department of Commerce FY 2011-2016 Strategic Plan

    Science.gov (United States)

    2011-03-11

    ... performance measures (i.e., GPRA measures) for tracking attainment. The Department's Strategic Plan is...-2016 Strategic Plan AGENCY: Department of Commerce. ACTION: Request for comment. SUMMARY: The Department of Commerce (Department) is updating its current FY 2007-2012 Strategic Plan. As part of this...

  20. Updated FY12 Ceramic Fuels Irradiation Test Plan

    International Nuclear Information System (INIS)

    Nelson, Andrew T.

    2012-01-01

    The Fuel Cycle Research and Development program is currently devoting resources to study of numerous fuel types with the aim of furthering understanding applicable to a range of reactors and fuel cycles. In FY11, effort within the ceramic fuels campaign focused on planning and preparation for a series of rabbit irradiations to be conducted at the High Flux Isotope Reactor located at Oak Ridge National Laboratory. The emphasis of these planned tests was to study the evolution of thermal conductivity in uranium dioxide and derivative compositions as a function of damage induced by neutron damage. Current fiscal realities have resulted in a scenario where completion of the planned rabbit irradiations is unlikely. Possibilities for execution of irradiation testing within the ceramic fuels campaign in the next several years will thus likely be restricted to avenues where strong synergies exist both within and outside the Fuel Cycle Research and Development program. Opportunities to augment the interests and needs of modeling, advanced characterization, and other campaigns present the most likely avenues for further work. These possibilities will be pursued with the hope of securing future funding. Utilization of synthetic microstructures prepared to better understand the most relevant actors encountered during irradiation of ceramic fuels thus represents the ceramic fuel campaign's most efficient means to enhance understanding of fuel response to burnup. This approach offers many of the favorable attributes embraced by the Separate Effects Testing paradigm, namely production of samples suitable to study specific, isolated phenomena. The recent success of xenon-imbedded thick films is representative of this approach. In the coming years, this strategy will be expanded to address a wider range of problems in conjunction with use of national user facilities novel characterization techniques to best utilize programmatic resources to support a science-based research program.

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  2. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  3. Savannah River Site FY 1998 Spent Nuclear Fuel Interim Management Plan

    International Nuclear Information System (INIS)

    Dupont, M.E.

    1998-01-01

    This document has been prepared to present in one place the near and long-term plans for safe management of Savannah River Site (SRS) spent nuclear fuel inventories until final disposition has been identified and implemented. The activities described are consistent with FY 1998 Annual Operational Plan guidance and with the December 1997 SRS Accelerated Cleanup Plan update. Summarized are highlights, key decision dates, and baseline assumptions of this plan

  4. Savannah River Site FY 2001 Spent Nuclear Fuel Integrated Management Plan

    International Nuclear Information System (INIS)

    Dunsmuir, M.D.

    2000-01-01

    This document presents the SRS integrated near and long-term plans (FY 2001 through 2035) for the safe life cycle management of SNF inventories and other SFSD legacy material programs/projects that impact this mission until final disposition has been implemented

  5. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  6. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  7. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  8. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  9. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Science.gov (United States)

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  10. General Counsel`s office FY 1995 site support program plan WBS 6.10.5

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, S.R.

    1994-09-01

    The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

  11. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  12. Long-range research plan. FY 1987-FY 1991. Volume 3

    International Nuclear Information System (INIS)

    1986-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  13. Long-Range Research Plan, FY 1986-FY 1990. Volume 2

    International Nuclear Information System (INIS)

    1985-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  14. FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-10-01

    Phase 1 of the HEDR Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations from limited radionuclides, in a limited geographical area and time period. Phase 1 ended in FY 1990. In February 1991, the TSP decided to shift the project planning approach away from phases--which were centered around completion of major portions of technical activities--to individual fiscal years (FYs), which span October of one year through September of the next. Therefore, activities that were previously designated to occur in phases are now designated in an integrated schedule to occur in one or more of the next fiscal years into FY 1995. Task plans are updated every 6 months. In FY 1992, scientists will continue to improve Phase 1 data and models to calculate more accurate and precise dose estimates. The plan for FY 1992 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meeting on August 19--20, 1991. The activities can be divided into four categories: (1) model and data evaluation activities, (2) additional dose estimates, (3) model and data development activities, and (4) technical and communication support. 3 figs., 2 tabs

  15. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  16. Neutral-beam development plan, FY 1982-1987

    International Nuclear Information System (INIS)

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables

  17. FY85 Program plan for the Defense Transuranic Waste Program (DTWP)

    International Nuclear Information System (INIS)

    1984-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY85 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research and Development (R and D), the organizational interfaces and communication channels for R and D and the establishment of procedures for planning, reporting, and budgeting of all R and D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. The work breakdown structure is reflected graphically immediately following the Administration section and is described in the subsequent narrative. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY85; outyear budget projections are presented for future years

  18. Pacific Northwest National Laboratory institutional plan: FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.

  19. FY97 Geothermal R&D Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  20. Tank Waste Remediation System Tank Waste Analysis Plan. FY 1995

    International Nuclear Information System (INIS)

    Haller, C.S.; Dove, T.H.

    1994-01-01

    This documents lays the groundwork for preparing the implementing the TWRS tank waste analysis planning and reporting for Fiscal Year 1995. This Tank Waste Characterization Plan meets the requirements specified in the Hanford Federal Facility Agreement and Consent Order, better known as the Tri-Party Agreement

  1. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)

  2. Sandia National Laboratories Institutional Plan FY1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information and computational technology; transportation energy technology and infrastructure; environmental technology; energy research and technology development; biomedical systems engineering; and post-cold war defense imperatives.

  3. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  4. Test plan for FY-91 dust control studies

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This test plan defines basic test procedures for testing commercially available vendor products as soil fixatives and dust suppression agents to determine their capability to control fugitive dust generation during transuranic waste retrieval and handling operations. A description of the test apparatus and methods are provided in this test plan. This test plan defines the sampling procedures, controls, and analytical methods for the samples collected. Data management is discussed, as well as quality assurance and safety requirements for the study. 6 refs., 5 figs

  5. Prevent, Counter, and Respond - A Strategic Plan to Reduce Global Nuclear Threats (FY 2016-FY2020)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    NNSA’s second core mission is reducing global nuclear dangers by preventing the acquisition of nuclear weapons or weapons-usable materials, countering efforts to acquire such weapons or materials, and responding to nuclear or radiological incidents. In 2015, NNSA reorganized its nonproliferation activities based on core competencies and realigned its counterterrorism and counterproliferation functions to more efficiently address both current and emerging threats and challenges. The reorganization accompanied the March 2015 release of the first ever Prevent, Counter, and Respond – A Strategic Plan to Reduce Global Nuclear Threats. This report, which NNSA will update annually, highlights key nuclear threat trends and describes NNSA’s integrated threat reduction strategy.

  6. RISMC Advanced Safety Analysis Project PlanFY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  7. Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)

    International Nuclear Information System (INIS)

    Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

    1982-01-01

    The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public

  8. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  9. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  10. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  11. Test plan for FY-91 alpha CAM evaluation

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This report describes the test plan for evaluating the Merlin Gerin, Inc., Edgar alpha continuous air monitor (CAM) and associated analysis system to be conducted by Idaho National Engineering Laboratory (INEL) for the Department of Energy. INEL has evaluated other commercial alpha CAM systems to detect transuranic contaminants during waste handling and retrieval operations. This test plan outlines experimental methods, sampling methods, sampling and analysis techniques, and equipment needed and safety and quality requirements to test the commercial CAM. 8 refs., 3 figs

  12. NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

    International Nuclear Information System (INIS)

    Bernholdt, David E.

    2012-01-01

    The vision of the NEAMS program is to bring truly predictive modeling and simulation (M and S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

  13. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  14. Environmental Development Plan for Transportation Energy Conservation. FY 79 update

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M. K.; Bernard, III, M. J.

    1978-12-15

    This is the first annual update of the Environment Development Plan (EDP) for the DOE Division of Transportation Energy Conservation program. It identifies the ecosystem, resource, physical environment, health, safety, and socioeconomic concerns associated with the division's transportation programs. These programs include the research, development, demonstration and assessment (RDD and A) of seventeen transportation technologies and several strategy and policy development and implementation projects. The transportation technologies projects deal with highway transport including electric vehicles, marine transport and pipeline transport. This EDP presents a research and assessment plan for resolving any potentially adverse environmental concerns stemming from these programs.

  15. Pacific Northwest Laboratory Institutional Plan FY 1995-2000

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This report serves as a document to describe the role PNL is positioned to take in the Department of Energy`s plans for its national centers in the period 1995-2000. It highlights the strengths of the facilities and personnel present at the laboratory, touches on the accomplishments and projects they have contributed to, and the direction being taken to prepare for the demands to be placed on DOE facilities in the near and far term. It consists of sections titled: director`s statement; laboratory mission and core competencies; laboratory strategic plan; laboratory initiatives; core business areas; critical success factors.

  16. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Mike (ed.); Hansen, Todd (ed.)

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  17. Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.

  18. RISMC advanced safety analysis project plan: FY2015 - FY2019. Light Water Reactor Sustainability Program

    International Nuclear Information System (INIS)

    Szilard, Ronaldo H; Smith, Curtis L; Youngblood, Robert

    2014-01-01

    In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: (1) A value proposition (@@@why is this important?@@@) that will make the case for stakeholder's use of the ASAP research and development (R&D) products; (2) An identification of likely end users and pathway to adoption of enhanced tools by the end-users; (3) A proposed set of practical and achievable @@use case@@@ demonstrations; (4) A proposed plan to address ASAP verification and validation (V&V) needs; and (5) A proposed schedule for the multi-year ASAP.

  19. Building America's Low-e Storm Window Adoption Program Plan (FY2014)

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-23

    Low emissivity (low-e) storm windows/panels appear to hold promise for effectively reducing existing home heating, ventilation, and air-conditioning (HVAC) consumption. Due to the affordability of low-e storm windows and the large numbers of existing homes that have low-performing single-pane or double-pane clear windows, a tremendous opportunity exists to provide energy savings by transforming the low-e storm window market and increasing market adoption. This report outlines U.S. Department of Energy (DOE) Building America’s planned market transformation activities in support of low-e storm window adoption during fiscal year (FY) 2014.

  20. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  1. BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-10

    This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and the nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.

  2. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1995-12-01

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ''as of date'' of June 30, 1995

  3. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  4. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    International Nuclear Information System (INIS)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  5. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  6. Sandia National Laboratories Institutional Plan: FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    Sandia`s Institutional Plan is by necessity a large document. As their missions have grown and diversified over the past decades, the variety of technical and site activities has increased. The programs and activities described here cover an enormous breadth of scientific and technological effort--from the creation of new materials to the development of a Sandia-wide electronic communications system. Today, there are three major themes that greatly influence this work. First, every federally funded institution is being challenged to find ways to become more cost effective, as the US seeks to reduce the deficit and achieve a balanced federal spending plan. Sandia is evaluating its business and operational processes to reduce the overall costs. Second, in response to the Galvin Task Force`s report ``Alternative Futures for the Department of Energy National Laboratories``, Sandia and the Department of Energy are working jointly to reduce the burden of administrative and compliance activities in order to devote more of the total effort to their principal research and development missions. Third, they are reevaluating the match between their missions and the programs they will emphasize in the future. They must demonstrate that Sandia`s roles--in national security, energy security, environmental integrity, and national scientific and technology agenda support--fit their special capabilities and skills and thus ensure their place in these missions for the longer planning horizon. The following areas are covered here: Sandia`s mission; laboratory directives; programmatic activities; technology partnerships and commercialization; Sandia`s resources; and protecting resources and the community.

  7. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  8. Revised Severe Accident Research Program plan, FY 1990--1992

    International Nuclear Information System (INIS)

    1989-08-01

    For the past 10 years, since the Three Mile Island accident, the NRC has sponsored an active research program on light-water-reactor severe accidents as part of a multi-faceted approach to reactor safety. This report describes the revised Severe Accident Research Program (SARP) and how the revisions are designed to provide confirmatory information and technical support to the NRC staff in implementing the staff's Integration Plan for Closure of Severe Accident Issues as described in SECY-88-147. The revised SARP addresses both the near-term research directed at providing a technical basis upon which decisions on important containment performance issues can be made and the long-term research needed to confirm and refine our understanding of severe accidents. In developing this plan, the staff recognized that the overall goal is to reduce the uncertainties in the source term sufficiently to enable the staff to make regulatory decisions on severe accident issues. However, the staff also recognized that for some issues it may not be practical to attempt to further reduce uncertainties, and some regulatory decisions or conclusions will have to be made with full awareness of existing uncertainties. 2 figs., 1 tab

  9. Environmental Development Plan (EDP): magnetohydrodynamics program, FY 1977

    International Nuclear Information System (INIS)

    1978-03-01

    This magnetohydrodynamics (MHD) EDP identifies and examines the environmental, health, and safety issues concerning the development of the ERDA Magnetohydrodynamics Program, the environmental activities needed to resolve these issues, applicable ongoing and completed research, and a time-phased action plan for the evaluation and mitigation of environmental impacts. A schedule for environmental research, assessment, and other activities is laid out. The purpose of the EDP is to identify environmental issues and to specify actions to ensure the environmental acceptability of commercial energy technologies being developed by ERDA. The EDP also will assist in coordinating ERDA's environmental activities with those of other government agencies. This document addresses the following technologies associated with ERDA's MHD program: (1) open-cycle magnetohydrodynamics; (2) closed-cycle plasma magnetohydrodynamics; and (3) closed-cycle liquid metal magnetohydrodynamics. The proposed environmental action plan is designed to meet the following objectives: (1) develop methods for monitoring and measuring emissions; (2) characterize air emissions, water effluents, and solid wastes from MHD; (3) determine potential environmental impacts and health hazards associated with MHD; (4) model pollutant transport and transformation; (5) ensure adequate control of pollutant emissions; (6) identify and minimize occupational health and safety hazards; (7) prepare NEPA compliance documents; and (8) assess the environmental, health, and safety impacts of the commercialized industry. This EDP will be updated and revised annually to take into account the progress of technologies toward commercialization, the environmental work accomplished, and the resolution of outstanding environmental issues concerning the technologies

  10. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  11. FY 1991 Task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The objectives of work in Fiscal Year (FY) 1991 are to analyze data and models used in Phase 1 and restructure the models to increase accuracy and reduce uncertainty in dose estimation capability. Databases will be expanded and efforts will begin to determine the appropriate scope (space, time, radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Project scope and accuracy requirements, once defined, can be translated into additional model and data requirements later in the project. Task plans for FY 1991 have been prepared based on activities approved by the Technical Steering Panel (TSP) in October 1990 and mid-year revisions discussed at the TSP planning/budget workshop in February 1991. The activities can be divided into two broad categories: (1) model and data development and evaluation, (2) project, technical and communication support. 3 figs., 1 tab

  12. Compatibility Grab Sampling and Analysis Plan for FY 2000

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. It is written in accordance with requirements identified in Data Quality Objectives for Tank Farms Waste Compatibility Program (Mulkey et al. 1999) and Tank Farm Waste Transfer Compatibility Program (Fowler 1999). In addition to analyses to support Compatibility, the Waste Feed Delivery program has requested that tank samples obtained for Compatibility also be analyzed to confirm the high-level waste and/or low-activity waste envelope(s) for the tank waste (Baldwin 1999). The analytical requirements to confirm waste envelopes are identified in Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Nguyen 1999a) and Data Quality Objectives for RPP Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for High-Level Waste Feed Batch X (Nguyen 1999b)

  13. Buried Waste Integrated Demonstration FY-93 Deployment Plan

    International Nuclear Information System (INIS)

    Bonnenberg, R.W.; Heard, R.E.; Milam, L.M.; Watson, L.R.

    1993-02-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year 1993 effort will deploy seven major field demonstrations at the Idaho National Engineering Laboratory's (INEL's) Radioactive Waste Management Complex Cold Test Pit. These major demonstrations are Remote Characterization System, Remote Excavation System, Overburden Removal, Waste Isolation, Contamination Control Unit, Rapid Monitoring Unit, and Fixation of Soil Surface Contamination. This document is the basic operational planning document for BWID deployment of the INEL field demonstrations. Additional sections deal briefly with four nonINEL field and laboratory demonstrations (Buried Waste Retrieval, Arc Melter Vitrification, Graphite DC Plasma Arc Melter, and Fixed Hearth Plasma Process) and with four INEL laboratory demonstrations (Electrostatic Curtain, Thermal Kinetics, Multiaxis Crane Control System, and Dig-Face Characterization)

  14. CANUDOS PLURAL: MEMÓRIAS EM CONFRONTO NAS COMEMORAÇÕES DOS CENTENÁRIOS DE CANUDOS (1993-1997)

    OpenAIRE

    Sá, Antônio Fernando de Araújo

    2011-01-01

    O ensaio analisa as matrizes discursivas que se manifestam na produção cultural referente às comemorações dos centenários da Guerra de Canudos (1993-1997). Realizando balanço historiográfíco e político da rememoração do episódio de Canudos e da prática social e política em torno de seu significado social, o trabalho contrasta as posições historiográficas recentes, as iniciativas eclesiásticas, políticas e populares, a ação institucional do Estado (Exército) e da pesquisa universitária q...

  15. Research and development project plans for FY 1995; 1995 nendo kenkyu kaihatsu jigyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The present research and development project plans for FY 1995 administrated by NEDO consist of research and development of new energy, and research and development of industrial technology. Are illustrated further enhancement of new energy introduction promotion measures, new stage of international projects, promotion of new energy and new energy technology development, further enhancement of industrial and scientific technology research and development, integrated measures against global and urban environment problems, and budget of NEDO projects in FY 1995. The research and development of new energy includes coal conversion technology, solar energy technology, geothermal energy technology, energy conversion and storage technology, hydrogen, alcohol and biomass energy technology, geothermal energy resources, coal resources development, new energy promotion department activities, NEDO information center activities, and so on. On the other hand, the research and development of industrial technology includes research and development of industrial technology, and global environment technology. The research and development of industrial technology consists of superconductivity, new materials, biotechnology, electronics, information and communications, machinery and aerospace, natural resources, humanity, life and society, and various leading researches.

  16. Oak Ridge National Laboratory DOE Site Sustainability Plan (SSP) with FY 2013 Performance Data

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Teresa A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lapsa, Melissa Voss [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2013-12-01

    Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory of the US Department of Energy (DOE) and one of the oldest national laboratories still operating at its original site. These characteristics provide the Sustainable Campus Initiative (SCI) both a unique opportunity and a unique challenge to integrate sustainability into facilities and activities. As outlined in this report, SCI is leveraging the outcomes of ORNL’s DOE-sponsored research and development programs to maximize the efficient use of energy and natural resources across ORNL. Wherever possible, ORNL is integrating technical innovations into new and existing facilities, systems, and processes with a widespread approach to achieving Executive Order 13514. ORNL continues to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability and continues to transform its culture and engage employees in supporting sustainability at work, at home, and in the community. Table 1 summarizes ORNL's FY 2013 performance and planned actions to attain future goals. ORNL has achieved numerous successes during FY 2013, which are described in detail throughout this document.

  17. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  18. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    International Nuclear Information System (INIS)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission's (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency's strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended

  19. Foundation for the Future. 2013-2015 Strategic Plan. FY13 Organizational Performance Plan

    Science.gov (United States)

    2013-01-01

    Strengths, Weaknesses, Opportunities, and Threats ( SWOT ) Analysis 192013–2015 Strategic Plan tr t ic l The Planning, Policy, and Leadership Support (PPLS...and public cloud mix Conduct government/private market survey to determine future cloud strategy Implement future cloud strategy  Thin Client...Systems Acquisition Reform Act of 2009, National Security Strategy , and the Digital Government Strategy • Department of Defense, as set forth in the

  20. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993

  1. Technology Integration Division FY 1992 Public Participation Program Management and Implementation Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The mission of the Office of Technology Development (OTD), to develop and apply existing and innovative environmental restoration and waste management technologies to the cleanup to Department of Energy (DOE) sites and facilities in accordance with applicable regulations, is to be carried out through the central mechanisms of the Integrated Demonstration (ID) and Integrated Program (IP). Regulations include provisions for public participation in DOE decision making regarding IDs. Beyond these requirements, DOE seeks to foster a more open culture in which public participation, based on two-way communication between DOE and the public, is not only welcomed, but actively encouraged. The public to which the Program is addressed actually consists of several distinct ''publics:'' state and local government officials; Indian tribes; citizen groups and individuals concerned about specific issues; citizen groups or individuals who are opinion leaders in their communities; other federal agencies; private industry; and academia involved in IDs. Participation of these publics in decision making means that their concerns, needs, objectives, and other input are identified by two-way communication between them and DOE, and that these factors are considered when decisions made about OTD activities. This plan outlines the TIPs Public Participation Program goals, objectives, and steps to be taken during Fiscal Year (FY) 1992 to move toward those goals and objectives, based on the challenges and opportunities currently recognized or assumed

  2. Integrated Task Plans for the Hanford Environmental Dose Reconstruction Project, FY 1992 through May 1994

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-09-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objective of work to be performed through May 1994 is to (1) determine the project's appropriate scope (space, time, radionuclides, pathways and individuals/population groups), (2) determine the project's appropriate level of accuracy (level of uncertainty in dose estimates) for the project, (3) complete model and data development, and (4) estimate doses for the Hanford Thyroid Disease Study (HTDS), representative individuals, and special populations as described herein. The plan for FY 1992 through May 1994 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meetings on August 19--20, 1991, and April 23--25, 1992. The activities can be divided into four broad categories: (1) model and data evaluation activities, (2)additional dose estimates, (3) model and data development activities, and (4)technical and communication support

  3. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  4. 75 FR 82377 - NOAA's Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Science.gov (United States)

    2010-12-30

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration (NOAA) NOAA's Office of... Administration (NOAA), Commerce. ACTION: Notice of availability and request for public comment. SUMMARY: NOAA's...: Yvette Jefferson. Mail: NOAA Office of Ocean Exploration and Research (OER), ATTN: OER Plan Comments...

  5. Definitive radiotherapy based on HDR brachytherapy with iridium 192 in uterine cervix carcinoma: report on the Vienna University Hospital findings (1993-1997) compared to the preceding period in the context of ICRU 38 recommendations

    International Nuclear Information System (INIS)

    Potter, R.; Knocke, T.H.; Fellner, C.; Baldass, M.; Reinthaller, A.; Kucera, H.

    2000-01-01

    According to the reports described in the literature, fractionated HDR brachytherapy seems to represent one option for the primary treatment of cervical carcinoma. In order to render such treatment transparent and comparable for those interested in the field, we have attempted to report our recent experience obtained in Vienna from 1993-1997 using the terminology proposed by the ICRU report 38, focusing in particular on dose and volume reporting and a linear-quadratic model. Based on these parameters, a comparison with the preceding period in Vienna (LDR/HDR) has been made, with an attempt to correlate different methods and parameters with outcome. One hundred and eighty-nine patients (mean age 67 years) were treated with curative intent (stage la: 2,lb: 11, II a:11, IIb: 79, IIIa: 59, IVa: 5, IVb: 3 patients) using a combination of intra-cervical high-dose rate (HDR) brachytherapy (ring-tandem applicator) and a box technique for external-beam therapy (EBT: 48.6-50 Gy, linac 25 MV). Small tumors were treated with 5-6 fractions of 7 Gy at point A and 50 Gy EBT (25 Gy in the brachytherapy reference volume) which is iso-effective to 76-86 Gy at point A. Large tumors received 3-4 fractions of 7 Gy after 50 Gy EBT with open fields, which is iso-effective to 82-92 Gy ar point A. TRAK varied from mean 1.4 cGy (3 fractions) to 2.8 Gy (6 fractions) at one meter. 3-D treatment planning for brachytherapy was based on conventional X-rays and in 181/189 patients on computed tomography (CT) with the applicator in place. Computer-calculated volumes of the brachytherapy reference isodose (7 Gy/fraction) ranged from 46-155 ccm (mean 87 ccm); the respective mean hwt-volume (height x width x thickness) was 180 ccm. The 60 Gy HWT volumes (25 Gy from EBT) for the irradiation of small tumors ranged from 240 to 407 ccm (mean 337 ccm) and for larger tumors (50 Gy for EBT) from 452 to 785 ccm (mean 607 ccm). The beam dose for brachytherapy was 16.2 Gy (6.2-37.8 Gy) at the ICRU rectum

  6. Command, Control, Communication, Computers and Information Technology (C4&IT). Strategic Plan, FY2008 - 2012

    National Research Council Canada - National Science Library

    2008-01-01

    ...&IT)/CG-6, Chief Information Officer (CIO), for the Coast Guard publishes this C4&IT Strategic Plan. The purpose of this plan is to provide a unifying strategy to better integrate and synchronize Coast Guard C4...

  7. Clear Purpose...Complete Commitment: A Long-Range Program To Provide Louisianians with Library and Information Services Adequate to Their Needs, 1993-1997.

    Science.gov (United States)

    Jaques, Thomas F.

    This long range plan, which was prepared in compliance with the Library Services and Construction Act (LSCA), begins with an overview of the library public and the state library agency in Louisiana. Identification of needs and action plans are presented in the following goal areas: (1) improving state library administration; (2) extending services…

  8. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double-Shell Tanks - FY 2001

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    2000-01-01

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities, plan for performance demonstration testing, and a plan for field activities. Also included are a Statement of Work for contractor performance and a protocol to be followed should tank flaws that exceed the acceptance criteria are found

  9. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  10. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    International Nuclear Information System (INIS)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required

  11. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    2000-01-01

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered

  12. Environmental compliance program FY 1999 multi-year work plan, WBS 1.8.2.3

    Energy Technology Data Exchange (ETDEWEB)

    Giese, K.A.

    1998-08-28

    The Environmental Compliance Program is developing and implementing a PHMC-wide chemical management system with the goal being to: (1) manage and control chemicals from procurement through use and final disposition; (2) develop and maintain procedures for identifying and evaluating hazards and environmental impacts present in facilities, and the hazard classification of the facilities. The US Department of Energy (DOE) may promulgate the final rule, 1 0 CFR 834, Radiation Protection of the Public and the Environment in FY 1999. This rule establishes controls for the release of radioactive material and limits for the amount of radiation exposure to the public and the environment. It will be applicable to activities of DOE contractors at the Hanford site. This rule is expected to replace the bulk of DOE Orders 5400.5, Radiation Protection of the Public and the Environment and 5400. 1, General Environmental Protection Program. In doing so, these Orders will be backed by the Price-Anderson enforcement procedures and carry penalties for non-compliance.

  13. Report of interim evaluation of Horonobe Underground Research Project Plan in FY2004

    International Nuclear Information System (INIS)

    2005-09-01

    The research results on the ground in the first step, until 2004 FY, and the research program of drift work in the second step are evaluated. On the first step, development of the geological environment research technologies, the monitoring technologies and the basic engineering technologies in the deep underground, long period stability of geological environment, and improvement of the geological disposal technologies, and the stability evaluation methods are investigated and these research results were high in estimation. The research program in the second step contains to obtain the geological environment data at sinking shaft, the effects of sinking on the geological environment, validity of the geological environment model in the first step and around the shaft are estimated. Validity of monitoring technologies of geological environment on the ground, engineering technologies of work, maintenance and management of shaft are evaluated. The fault, upheaval, submergence, change of sea level and climate are determined by earthquakes measurements, GPS and time-stratigraphic classification. The geological disposal technologies are improved by storage of data, better model and verification of engineering element techniques. Test program of materials transition in the geological disposal system is work out. (S.Y.)

  14. Environmental compliance program FY 1999 multi-year work plan, WBS 1.8.2.3

    International Nuclear Information System (INIS)

    Giese, K.A.

    1998-01-01

    The Environmental Compliance Program is developing and implementing a PHMC-wide chemical management system with the goal being to: (1) manage and control chemicals from procurement through use and final disposition; (2) develop and maintain procedures for identifying and evaluating hazards and environmental impacts present in facilities, and the hazard classification of the facilities. The US Department of Energy (DOE) may promulgate the final rule, 1 0 CFR 834, Radiation Protection of the Public and the Environment in FY 1999. This rule establishes controls for the release of radioactive material and limits for the amount of radiation exposure to the public and the environment. It will be applicable to activities of DOE contractors at the Hanford site. This rule is expected to replace the bulk of DOE Orders 5400.5, Radiation Protection of the Public and the Environment and 5400. 1, General Environmental Protection Program. In doing so, these Orders will be backed by the Price-Anderson enforcement procedures and carry penalties for non-compliance

  15. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  16. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  17. Information resources management long-range plan, FY1994--1998

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  18. Information resources management long-range plan, FY1994--1998

    International Nuclear Information System (INIS)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements

  19. Airspace Systems Program: Next Generation Air Transportation System Concepts and Technology Development FY2010 Project Plan Version 3.0

    Science.gov (United States)

    Kopardekar, Parimal H.

    2010-01-01

    This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders

  20. FY 1995 remedial investigation work plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Watkins, D.R.; Herbes, S.E.

    1994-09-01

    Field activities to support the remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) include characterization of the nature and extent of contamination in WAG 2, specifically to support risk-based remediation decisions. WAG 2 is the major drainage system downgradient of other WAGs containing significant sources of contamination at ORNL. The RI of WAG 2 is developed in three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upgradient WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate reevaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Specifically, Phase 2 activities are required to track key areas to determine if changes have occurred in WAG 2 that would require (1) interim remedial action to protect human health and the environment or (2) changes in remedial action plans and schedules for WAG2 because of changing contaminant release patterns in upslope WAGs or because of the effects of interim remedial or removal actions in other WAGs. This report defines activities to be conducted in FY 1995 for completion of the Phase 1 RI and initiation of limited Phase 2 field work

  1. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  2. Extra Help with Medicare Prescription Drug Plan Cost (FY 2010-2015)

    Data.gov (United States)

    Social Security Administration — This file contains information about Social Security determinations of eligibility for Extra Help with Medicare Prescription Drug Plan Costs. Specific data elements...

  3. Extra Help with Medicare Prescription Drug Plan Cost (FY 2016 Onward)

    Data.gov (United States)

    Social Security Administration — This file contains information about Social Security determinations of eligibility for Extra Help with Medicare Prescription Drug Plan Costs. Specific data elements...

  4. Computing Division two-year operational plan, FY 1981-1982

    International Nuclear Information System (INIS)

    Euald, R.H.; Worlton, W.J.; McCormick, M.

    1981-02-01

    This report is a comprehensive planning guide for the Computing Division of the Los Alamos National Laboratory for fiscal years 1981 and 1982. Subjects discussed include critical issues, programmatic requiements, hardware plans, software projects, direct user services, research projects, and projections of future developments

  5. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  6. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  7. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    International Nuclear Information System (INIS)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991

  8. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  9. Chief Financial Officer FY 1997 status report and five-year plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

  10. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    Energy Technology Data Exchange (ETDEWEB)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation.

  11. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    International Nuclear Information System (INIS)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation

  12. Savannah River Site nuclear materials management plan FY 2017-2031

    Energy Technology Data Exchange (ETDEWEB)

    Magoulas, V. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-22

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclear Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.

  13. FY 2004 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — ...This Supplement to the Presidents Budget for Fiscal Year (FY) 2004 summarizes the NITRD agencies coordinated research activities and FY 2004 plans, as required by...

  14. Financial services FY 1995 site support program plan WBS 6.10.4

    Energy Technology Data Exchange (ETDEWEB)

    Vodney, E.P.

    1994-09-01

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  15. Delivering Innovation: The Joint Concept Development and Experimentation Campaign Plan FY2004-2011

    Science.gov (United States)

    2004-01-26

    Janushkowsky (STRATCOM), Maj Gen Stenner (SOUTHCOM), LTC Butts (TRANSCOM) Campaign Plan; J9 UpdateFace to Face Conference12 Feb 2003 COL (P) Verbeck (EUCOM... Stenner (SOUTHCOM), Ms. Young (TRANSCOM), MG Higgins (USFK), Dr. Hanley (OSD-OFT), RADM Gallagher (ACT) Combatant Commander Attendees IWS IWS VTC

  16. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  17. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    International Nuclear Information System (INIS)

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98

  18. Buried Waste Integrated Demonstration Commercialization Action Plans second quarter, FY-94

    International Nuclear Information System (INIS)

    Kaupanger, R.M.

    1994-06-01

    The Federal Government is extremely good at creating knowledge and developing new technology. However, our declining market share in many industries points to a weakness in our ability to successfully commercialize new discoveries. BWID assembled a team of qualified experts with expertise in technology transfer and broad-based technology knowledge to assist with this effort. Five new technologies were chosen to develop commercialization action plans. They include Dig-Face Characterization, Imaging Infrared Interferometer for Waste Characterization, Tensor Magnetic Gradiometer, Very Early Time Electromagnetic System, and Virtual Environment Generation of Buried Waste. Each plan includes a short description of the technology, a market overview, a list of potential customers, a description of competitors and the technology's competitive advantage, the status of intellectual property, the status of technology transfer, a table of action items, commercialization contacts, and program contacts

  19. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    International Nuclear Information System (INIS)

    Good, D.E.

    1997-01-01

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline

  20. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D ampersand D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S ampersand M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D ampersand D contractors are required to prepare formal plans that document the S ampersand M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D ampersand D Program

  1. West Valley Demonstration Project community relations plan FY 1990/91

    International Nuclear Information System (INIS)

    Damerow, M.W.

    1989-09-01

    The purpose of the Community Relations Plan is to fully inform the community about the West Valley Demonstration Project (WVDP) and provide opportunities for public input. A sound approach to community relations is essential to the creation and maintenance of public awareness and community support. The WVDP is a matter of considerable public interest because it deals with nuclear waste. The mission of the WVDP is to solve an existing environmental concern by solidifying high-level radioactive waste and transporting the solidified waste to a federal repository for permanent disposal. The public requires evidence of the continued commitment and demonstrated progress of the industry and government in carrying out the mission in order to sustain confidence that the WVDP is being managed well and will be discussed successfully completed. For this reason, a comprehensive communication plan is essential for the successful completion of the WVDP

  2. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    Science.gov (United States)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  3. Special initiatives FY 1996 multi-year program plan (MYPP) WBS 5.0. Revision 1

    International Nuclear Information System (INIS)

    Howald, S.C.

    1995-09-01

    The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives, researching special programs, studying locating new activities ar the Hanford Site, producing specialty materials, providing consulting support to other sites, and managing a broad spectrum of US and international test programs. The Special Initiatives Program discussed in this plan consists of the following elements: space power programs, advanced programs, special programs, and program strategy

  4. Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004

    Energy Technology Data Exchange (ETDEWEB)

    Enge, R.S.

    1999-12-01

    In this first institutional plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus its efforts on three strategic thrusts: (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemicals from biomass). The first strategic thrust focuses on meeting DOE-EMs environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NEs needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this institutional plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this institutional plan will offer additional content and resource refinements.

  5. SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

    Energy Technology Data Exchange (ETDEWEB)

    Cipriani, Ralph J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-12-01

    Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

  6. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    Energy Technology Data Exchange (ETDEWEB)

    DiVincenzo, E.P.

    1994-09-27

    The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

  7. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    International Nuclear Information System (INIS)

    DiVincenzo, E.P.

    1994-01-01

    The Safety Analysis ampersand Engineering (SA ampersand E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA ampersand E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA ampersand E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA ampersand E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA ampersand E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA ampersand E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker

  8. Test plan for the FY 1997 rebound study at the carbon tetrachloride soil vapor extraction site

    International Nuclear Information System (INIS)

    Rohay, V.J.; Tranbarger, R.K.

    1996-11-01

    This test plan describes the strategy and field measurements designed to evaluate the potential rebound of carbon tetrachloride vapor concentrations following cessation of soil vapor extraction (SVE) operations at the 200-ZP-2 Operable Unit in the 200 West Area of the Hanford Site. Soil vapor extraction was initiated in February 1992 as the preferred remedial alternative of the Carbon Tetrachloride Expedited Response Action for removal of carbon tetrachloride from the unsaturated zone beneath the primary carbon tetrachloride disposal sites. The magnitude, extent, and rate of rebound in carbon tetrachloride vapor concentrations will help determine the availability of additional carbon tetrachloride for removal using SVE. At the conclusion of the field measurements, a report will be completed to evaluate the results of the rebound study

  9. Work management administration FY 1995 site support program plan WBS 6.2

    Energy Technology Data Exchange (ETDEWEB)

    Hale, N.S.

    1994-09-01

    Westinghouse Hanford Company`s (WHC) near-term vision is to implement a Site-wide work management program that is consistent from one facility to the other, and can realize workforce efficiencies, minimum down time, and familiarization with facilities uniqueness. Additionally, consistent Hanford Site work management processes can produce meaningful information to be shared complex-wide as the US Department of Energy (DOE) cleans up facilities Site-wide. It is the mission of the WHC Work Management Administration Program to provide guidance and program direction on how to implement consistent and effective work management across the Hanford Site that comply with the DOE and other regulatory requirements. This report describes the steps needed to implement a work management plan at Hanford.

  10. Safeguards and Security FY 1996 Program Plan: WBS 6.6

    Energy Technology Data Exchange (ETDEWEB)

    Lee, F.D.

    1995-08-01

    The Safeguards and Security (SAS) Program is based upon integrity, competence and innovation in the protection of the public and Hanford resources through: (1) outstanding assistance, oversight, education, and counsel to their customers to ensure the protection of the public, site personnel, assets, and information; (2) value-added and cost-effective solutions to Hanford issues; and (3) risk management techniques to ensure effective asset protection, site accessibility, and the flexibility to adapt to changing customer needs. This plan is divided into two parts: overview and SAS WBS (work breakdown structure) dictionary sheets. The overview is divided into vision and mission, goals and objectives, assumptions and priorities, milestones, and a summary. The SAS WBS dictionary sheets are divided into department overhead, general and administrative, sitewide support, Hanford patrol, traffic safety, and locksmith services.

  11. Safeguards and Security FY 1996 Program Plan: WBS 6.6

    International Nuclear Information System (INIS)

    Lee, F.D.

    1995-08-01

    The Safeguards and Security (SAS) Program is based upon integrity, competence and innovation in the protection of the public and Hanford resources through: (1) outstanding assistance, oversight, education, and counsel to their customers to ensure the protection of the public, site personnel, assets, and information; (2) value-added and cost-effective solutions to Hanford issues; and (3) risk management techniques to ensure effective asset protection, site accessibility, and the flexibility to adapt to changing customer needs. This plan is divided into two parts: overview and SAS WBS (work breakdown structure) dictionary sheets. The overview is divided into vision and mission, goals and objectives, assumptions and priorities, milestones, and a summary. The SAS WBS dictionary sheets are divided into department overhead, general and administrative, sitewide support, Hanford patrol, traffic safety, and locksmith services

  12. Study plan for research on long-term stability of geological environments in FY2009

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Hanamuro, Takahiro; Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2009-09-01

    The Japanese islands lie in a region of the Circum-Pacific orogenic belt characterized by active tectonics such as volcanism and earthquakes. The concept of geological disposal of HLW in Japan is based on a multi-barrier system which consists of the engineered barrier in the stable geological environments and the natural barrier. The natural phenomena which potentially affect the geological environments in tectonically active Japan are volcanism, faulting, uplift, denudation, climatic change, and sea-level change. Investigation technologies to evaluate their long-term stability of the geological environments have been developed. In fiscal year 2009, we continue researches to develop technologies for detecting latent geotectonic events in preliminary investigation. With regard to modelling technology, we plan to develop prediction models for evaluating the changes of geological environment (e.g., thermal, hydraulic, mechanical, and geochemical conditions) for long term. In addition to these, the development of dating techniques prerequisite for these studies is also carried out. (author)

  13. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    International Nuclear Information System (INIS)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning

  14. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    Energy Technology Data Exchange (ETDEWEB)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  15. Electronics Engineering Research. Final report, FY 1979

    International Nuclear Information System (INIS)

    Weissenberger, S.

    1980-01-01

    Accomplishments in Electronics Engineering Research (EER) during FY79 spanned a broad range of technologies, from high-speed microelectronics to digital image enhancement; from underground probing with electromagnetic waves to detecting neutrons with a small solid-state device; and from computer systems to aid engineers, to software tools to aid programmers. This report describes the overall EER program and its objectives, summarizes progress made in FY79, and outlines plans for FY80

  16. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  17. Hanford fire department FY 1999 annual work plan WBS 6.5.7

    International Nuclear Information System (INIS)

    GOOD, D.E.

    1999-01-01

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education

  18. Hanford fire department FY 99 annual work plan WBS 6.5.7

    Energy Technology Data Exchange (ETDEWEB)

    GOOD, D.E.

    1999-02-24

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

  19. Results of dose control and measurement plans applied for SPEAR3 commissioning year (FY04)

    Energy Technology Data Exchange (ETDEWEB)

    Khater, Hesham [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)]. E-mail: khater1@llnl.gov; Liu, James [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Prinz, Alyssa [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Allan, Jim [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Rokni, Sayed [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)

    2006-12-15

    Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as radiation areas (RA). Areas outside RA were classified as radiologically controlled area (RCA). Access to these areas required less training than the RA. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

  20. Test plan for sonic drilling at the Hanford Site in FY 1993

    International Nuclear Information System (INIS)

    McLellan, G.W.

    1993-01-01

    This test plan describes the field demonstration of the sonic drilling system being conducted as a coordinated effort between the VOC-Arid ID (Integrated Demonstration) and the 200 West Area Carbon Tetrachloride ERA (Expedited Response Action) programs at Hanford. The purpose of this test is to evaluate the Water Development Corporation's drilling system, modify components as necessary and determine compatible drilling applications for the sonic drilling method for use at facilities in the DOE complex. The sonic demonstration is being conducted as the first field test under the Cooperative Research and Development Agreement (CRADA) which involves the US Department of Energy, Pacific Northwest Laboratory, Westinghouse Hanford Company and Water Development Corporation. The sonic drilling system will be used to drill a 45 degree vadose zone well, two vertical wells at the VOC-Arid ID site, and several test holes at the Drilling Technology Test Site north of the 200 Area fire station. Testing at other locations will depend on the performance of the drilling method. Performance of this technology will be compared to the baseline drilling method (cable-tool)

  1. FY 2005 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Supplement to the President`s FY 2005 Budget reports on the FY 2004 research and development R and D activities and FY 2005 plans of the multiagency Networking...

  2. FY2017 Pilot Project Plan for the Nuclear Energy Knowledge and Validation Center Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Ren, Weiju [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-10-30

    validation data package (composed of experimental and dummy data) will provide a clear and complete instance delineating the structure of the desired validation data and enabling effective communication among the modeler, the experimentalist, and the knowledgebase developer. With a good common understanding of the desired data structure by the three parties of subject matter experts, further existing data hunting will be effectively conducted, new experimental data generation will be realistically pursued, knowledgebase schema will be practically designed; and code validation will be confidently planned.

  3. FY 2012 Audit Plan

    Science.gov (United States)

    2011-10-01

    September 30, 2012 and 2011 Objective: Determine whether KPMG complied, in all material respects, with U.S. generally accepted government auditing...reported the same 13 material internal control weaknesses as the previous year. These pervasive and longstanding financial management issues...Defense Contract Management Agency’s Investigation and Control of Nonconforming Materials (D2011-D000CD-0264.000) Objective: Examine the Defense

  4. Site-directed subsurface environmental initiative: Five year summary and plan for fundamental research in subsoils and in groundwater, FY 1989-FY 1993

    International Nuclear Information System (INIS)

    1987-10-01

    The overall goal of this research initiative is to develop the necessary scientific basis for resolution of key technical obstacles to defining and remediating contamination at DOE and other waste sites. To accomplish this goal, the resouces of the national laboratories, universities, and DOE sites will be fully utilized to develop and demonstrate improved, cost-effective, and environmentally acceptable techniques for predicting the behavior of contaminants and reducing their concentrations in ground water. This document is a preliminary plan to set general research directions for a program extending into the 1990s. The needs and milestones identified in this plan may change with additional guidance from DOE sites. Promising research opportunities will be identified as part of national laboratory submissions of preliminary proposals

  5. Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2015). Development of design and construction planning and countermeasure technologies (Contract research)

    International Nuclear Information System (INIS)

    Toguri, Satohito; Kobayashi, Shinji; Tsuji, Masakuni; Yahagi, Ryoji; Yamada, Toshiko; Matsui, Hiroya; Mikake, Shinichiro; Aoyagi, Yoshiaki; Sato, Toshinori

    2017-03-01

    The study on engineering technology in the Mizunami Underground Research Laboratory (MIU) project roughly consists of (1)development of design and construction planning technologies, (2)development of construction technology, (3)development of countermeasure technology, (4)development of technology for security, and (5) development of technologies regarding restoration and mitigating of the excavation effect. So far, the verification of the initial design based on the data obtained during excavation was mainly conducted as a research in the Construction Phase, also the countermeasure technologies to control groundwater inflow were examined as a research in the Operation Phase. In FY2015, as a part of the important issues on the research program, “Development of countermeasure technologies for reducing groundwater inflow” in the Japan Atomic Energy Agency 3rd Midterm Plan, water-tight grouting method has been developed. Grouting methods utilized in the MIU were evaluated and the post-excavation grouting at the -500m Access/Research Gallery-South was planned based on these evaluation results. Also, technology development from the viewpoint of geological disposal was summarized, and information on the alternative method to the grouting method was collected and organized. (author)

  6. FY17 Strategic Themes.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000 strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.

  7. FY 1987 program summary document: Office of Defense Waste and Transportation Management

    International Nuclear Information System (INIS)

    1987-04-01

    This document describes the Office of Defense Waste and Transportation Management (DWTM) Program as supported by the President's Fiscal Year (FY) 1987 Budget Request to Congress. It specifically addresses the program's organization, objectives, strategies, and plans for FY 1987

  8. FY 1996 Congressional budget request: Budget highlights

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    The FY 1996 budget presentation is organized by the Department`s major business lines. An accompanying chart displays the request for new budget authority. The report compares the budget request for FY 1996 with the appropriated FY 1995 funding levels displayed on a comparable basis. The FY 1996 budget represents the first year of a five year plan in which the Department will reduce its spending by $15.8 billion in budget authority and by $14.1 billion in outlays. FY 1996 is a transition year as the Department embarks on its multiyear effort to do more with less. The Budget Highlights are presented by business line; however, the fifth business line, Economic Productivity, which is described in the Policy Overview section, cuts across multiple organizational missions, funding levels and activities and is therefore included in the discussion of the other four business lines.

  9. 78 FR 55257 - Request for Comments on the Draft Departmental Strategic Plan for FY 2014-2018

    Science.gov (United States)

    2013-09-10

    ... strategic planning consultation process is an opportunity for the Department to refine and strengthen the... and Human Services, Office of the Assistant Secretary for Planning and Evaluation, Strategic Planning... planning process under the Government Performance and Results Modernization Act of 2010 (GPRA-MA) (Pub. L...

  10. Institutional plan FY 1999--FY 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    Los Alamos has a well-defined and nationally important mission: to reduce the global nuclear danger. This central national security mission consists of four main elements: stockpile stewardship, nuclear materials management, nonproliferation and arms control, and cleanup of the environmental legacy of nuclear weapons activities. The Laboratory provides support for and ensures confidence in the nation`s nuclear stockpile without nuclear testing. This challenge requires the Laboratory to continually hone its scientific acumen and technological capabilities to perform this task reliably using an interdisciplinary approach and advanced experimental and modeling techniques. In the last two National Defense Authorization Acts, Congress identified the need to protect the nation from the proliferation of weapons of mass destruction, which includes nuclear, chemical, and biological weapons, and their potential use by terrorists. Los Alamos is applying multidisciplinary science and engineering skills to address these problems. In addition, the Laboratory`s critical programmatic roles in stockpile stewardship and threat reduction are complemented by its waste management operations and environmental restoration work. Information on specific programs is available in Section 2 of this document.

  11. Institutional plan: Supplements, FY 1998--FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This supplement contains summaries of the projects, both DOE and non-DOE, that the Argonne National Laboratory conducts. DOE projects include nuclear energy, energy research, energy efficiency, fossil energy, defense programs, non-proliferation and national security, environmental management, and civilian radioactive waste management. The second part of this report contains descriptions of the Argonne National Lab site and facilities. Budget information is also presented.

  12. Defense Finance and Accounting Service Work on the Navy Defense Business Operations Fund FY 1995 Financial Statements

    National Research Council Canada - National Science Library

    lane, F

    1996-01-01

    ... Financial Statements of the Navy Defense Business Operations Fund. We also planned to determine whether FY 1995 ending balances reported by DFAS Cleveland Center are usable as beginning balances for FY 1996 financial statements...

  13. FY16 Strategic Themes.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    I am pleased to present this summary of the Division 1000 Science and Technology Strategic Plan. This plan was created with considerable participation from all levels of management in Division 1000, and is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. The plan is characterized by four strategic themes: Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Each theme is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16. I want to be clear that this is not a strategy to be pursued in tension with the Laboratory strategic plan. Rather, it is intended to describe “how” we intend to show up for the “what” described in Sandia’s Strategic Plan. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming year.

  14. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  15. Legislative Branch: FY2014 Appropriations

    Science.gov (United States)

    2013-11-25

    for the renovation of the Cannon House Office Building and the condition of the Rayburn building, the effect of the sequester on overtime work, plans...provided by the Joint Committee on Taxation for all revenue legislation (Balanced Budget and Emergency Deficit Control Act of 1985, P.L. 99-177...Committee, the Joint Committee on Taxation , the Office of the Attending Physician, and the Office of Congressional Accessibility Services. The FY2012

  16. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    Energy Technology Data Exchange (ETDEWEB)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  17. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS number-sign 1.4

    International Nuclear Information System (INIS)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan

  18. Reduction of mercury in plant effluents data management implementation plan FY 1998 Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Fischer, K.N.; Forsberg, V.M.

    1998-01-01

    The purpose of the Data Management Implementation Plan (DMIP) is to document the requirements and responsibilities for managing, using, and archiving data used for the Reduction of Mercury in Plant Effluents (RMPE) project. The DMIP was created for the RMPE project in accordance with the guidance given in Environmental Data Management Implementation Handbook for the Environmental Restoration Program (ES/ER/TM- 88/R 1) and in ''Developing, implementing, and Maintaining Data Management Implementation Plans'' (EMEF/ER-P2216, Rev. 0). This document reflects the state of the RMPE project and the types of environmental monitoring planned as they existed through March 16, 1998. The scope of this document is the management of the RMPE project's environmental information, which includes electronic or hard copy records describing environmental processes or conditions. The RMPE program was established as a best management practice to address sources in the Y-12 Plant that contribute mercury to plant effluents being discharged to Upper East Fork Poplar Creek. The strategy is multifaceted: reroute clean water through clean conduits; clean, reline, and/or replace mercury-contaminated water conduits; eliminate or reduce accumulations of mercury in tanks and sumps; isolate inaccessible mercury from contact with water; and install treatment capability for streams where the source(s) cannot be eliminated or mitigated to acceptable levels. The RMPE project database consists of data from surface water monitoring and sediment sampling at locations of interest within the Y-12 Plant. This DMIP describes the types and sources of RMPE data, other data systems relevant to the RMPE project, the different data management interactions and flow of information involved in processing RMPE data, and the systems used in data management

  19. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE

  20. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE.

  1. FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Watkins, D.R.; Herbes, S.E.

    1994-12-01

    The purpose of this project is to provide key information needed by decision makers to expedite the process of environmental restoration and to provide the data base required by the Remedial Investigation/Feasibility Study (RI/FS) for Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL). WAG 2 is the major drainage system downgradient of other WAGs that contain significant sources of contamination at ORNL. Field activities to support the remedial investigation for the RI portion include characterization of the nature and extent of contamination in WAG 2 [consisting of White Oak Creek (WOC) and associated tributaries and floodplain, White Oak Lake (WOL), and White Oak Creek Embayment (WOCE)], specifically to support risk-based remediation decisions. The project consists of three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upslope WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate revaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Overall RI objectives, consistent with ORNL Environmental Restoration (ER) Program strategic objectives to reduce risks and comply with environmental regulations, are discussed in the WAG 2 Remedial Investigation Plan

  2. FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-11-01

    This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

  3. LANL FY11 activities(u)

    Energy Technology Data Exchange (ETDEWEB)

    Aragon, Ezekiel D [Los Alamos National Laboratory

    2011-01-06

    Briefings presenting W78 programmatic activities for FY11 and the status and plan for associated Hydro 3617, is included wherewith in support of the NNSA W78 Program Review Meetings scheduled for January 11 thru 13, 2011, at the Savannah River Plant, SC.

  4. MHD Program Plan, FY 1992

    International Nuclear Information System (INIS)

    1991-10-01

    The current MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. Essential elements of the current program include: (1) develop technical and environmental data for the integrated MHD topping cycle system through POC testing (1,000 hours); (2) develop technical and environmental data for the integrated MHD bottoming cycle sub system through POC testing (4,000 hours); (3) design, construct, and operate a seed regeneration POC facility (SRPF) capable of processing spent seed materials from the MHD bottoming cycle; (4) prepare conceptual designs for a site specific MHD retrofit plant; and (5) continue system studies and supporting research necessary for system testing. The current MHD program continues to be directed toward coal fired power plant applications, both stand-alone and retrofit. Development of a plant should enhance the attractiveness of MHD for applications other than electrical power. MHD may find application in electrical energy intensive industries and in the defense sector

  5. Conceptual design study of fusion experimental reactor (FY86 FER)

    International Nuclear Information System (INIS)

    Saito, Ryusei; Kashihara, Shin-ichiro; Itoh, Shin-ichi

    1987-08-01

    This report describes the results of conceptual design study on plant systems for the Fusion Experimental Reactor (FY86 FER). Design studies for FER plant systems have been continued from FY85, especially for design modifications made in accordance with revisions of plasma scaling parameters and system improvements. This report describes 1) system construction, 2) site and reactor building plan, 3) repaire and maintenance system, 4) tritium circulation system, 5) heating, ventilation and air conditioning system, 6) tritium clean-up system, 7) cooling and baking system, 8) waste treatment and storage system, 9) control system, 10) electric power system, 11) site factory plan, all of which are a part of FY86 design work. The plant systems described in this report generally have been based on the FY86 FER (ACS Reactor) which is an one of the six candidates for FER. (author)

  6. Hangman Restoration Project Year-End Report FY2008.

    Energy Technology Data Exchange (ETDEWEB)

    Coeur d' Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  7. Environmental Measurements Laboratory 2002 Unit Performance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  8. April 25, 2003, FY2003 Progress Summary and FY2002 Program Plan, Statement of Work and Deliverables for Development of High Average Power Diode-Pumped Solid State Lasers,and Complementary Technologies, for Applications in Energy and Defense

    International Nuclear Information System (INIS)

    Meier, W; Bibeau, C

    2005-01-01

    The High Average Power Laser Program (HAPL) is a multi-institutional, synergistic effort to develop inertial fusion energy (IFE). This program is building a physics and technology base to complement the laser-fusion science being pursued by DOE Defense programs in support of Stockpile Stewardship. The primary institutions responsible for overseeing and coordinating the research activities are the Naval Research Laboratory (NRL) and Lawrence Livermore National Laboratory (LLNL). The current LLNL proposal is a companion document to the one submitted by NRL, for which the driver development element is focused on the krypton fluoride excimer laser option. The NRL and LLNL proposals also jointly pursue complementary activities with the associated rep-rated laser technologies relating to target fabrication, target injection, final optics, fusion chamber, target physics, materials and power plant economics. This proposal requests continued funding in FY03 to support LLNL in its program to build a 1 kW, 100 J, diode-pumped, crystalline laser, as well as research into high gain fusion target design, fusion chamber issues, and survivability of the final optic element. These technologies are crucial to the feasibility of inertial fusion energy power plants and also have relevance in rep-rated stewardship experiments. The HAPL Program pursues technologies needed for laser-driven IFE. System level considerations indicate that a rep-rated laser technology will be needed, operating at 5-10 Hz. Since a total energy of ∼2 MJ will ultimately be required to achieve suitable target gain with direct drive targets, the architecture must be scaleable. The Mercury Laser is intended to offer such an architecture. Mercury is a solid state laser that incorporates diodes, crystals and gas cooling technologies

  9. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    Science.gov (United States)

    2007-12-14

    and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25

  10. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  11. Oak Ridge TNS Program: summary of FY 1978 activities

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Brown, T.G.

    1979-07-01

    The Next Step (TNS) represents the stage of fusion energy development in which the major emphasis is on engineering testing and demonstration. In this document, the activities of the Oak Ridge TNS Program for FY 1978 are described and summarized. The Reference Design that has evolved from these activities is described, its operating characteristics are examined, and project planning issues are considered. Major conclusions from the FY 1978 effort are stated

  12. Disability Compensation and Patient Expenditures: FY2000 to FY2013

    Data.gov (United States)

    Department of Veterans Affairs — This report contains FY2000 through FY2013 data on disability compensation expenditures and recipients and on VA healthcare system patients and patient expenditures.

  13. Coastal Maine Submerged Aquatic Vegetation Data 1993-1997 Geodatabase

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Maine's eelgrass (SAV) meadows form an important aquatic habitat for the state. These meadows provide shelter for juvenile fish, and invertebrates. In certain...

  14. FY16 Strategic Themes White Paper.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    The Science and Technology (S&T) Division 1000 Strategic Plan includes the Themes, Goals, and Actions for FY16. S&T will continue to support the Labs Strategic plan, Mission Areas and Program Management Units by focusing on four strategic themes that align with the targeted needs of the Labs. The themes presented in this plan are Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Collectively they emphasize diverse, collaborative teams and a self-reliant culture of safety that will deliver on our promise of exceptional service in the national interest like never before. Mission Engagement focuses on increasing collaboration at all levels but with emphasis at the strategic level with mission efforts across the labs. Bold Outcomes seeks to increase the ability to take thoughtful risks with the goal of achieving transformative breakthroughs more frequently. Collaborative environment strives for a self-aware, collaborative working environment that bridges the many cultures of Sandia. Finally, Safety Imperative aims to minimize the risk of serious injury and to continuously strengthen the safety culture. Each of these themes is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16 and leading into FY17.

  15. Annual Performance Report - FY 2011

    Science.gov (United States)

    This report summarizes OIG activity, performance, results, and challenges, and provides a financial accounting of resources for fiscal year (FY) 2011 compared to our FY 2011 annual performance targets.

  16. FY 10 Multifamily Initial Endorsements

    Data.gov (United States)

    Department of Housing and Urban Development — In FY 2010, HUD's Multifamily's 18 Hubs initially endorsed 1011 loans totaling $11.3 billion and providing 170,672 units/ beds. FY 10's $11.3 billion is the highest...

  17. U.S. Department of Education FY 2010 Summary of Performance and Financial Information

    Science.gov (United States)

    US Department of Education, 2011

    2011-01-01

    This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Summary of Performance and Financial Information." FY 2010 was a transition year for the Department as it moves to a new strategic plan. The Department is still firmly committed to its mission of promoting achievement and preparation for global competitiveness…

  18. Repository Technology Program activities, FY 1988

    International Nuclear Information System (INIS)

    Yow, J.L. Jr.; Wijesinghe, A.M.; Thorpe, R.K.; Knapp, R.B.

    1989-07-01

    Our technical activities in FY 1988 included instrument selection and evaluation, calculational work, and simulator development. Near the end of the fiscal year, we began preparing several topical reports to document our results. This fiscal year, we continued developing three-dimensional numerical simulators to model coupled hydrologic-and mechanical-rock mass responses and, thus, to provide representative numerical tools for understanding and calculating these in situ processes. We also began scoping calculations in the second half of FY 1988 to evaluate ERE design criteria, but this work was redirected late in the year when the DOE/AECL Subsidiary Agreement was set aside. Our work in developing and evaluating experimental techniques focused on total pressure measurements, moisture content measurement, and tracer detection instrumentation for sealing experiments and for rock-mass-response field tests. At the end of the fiscal year, we completed a review of measurement technology for instrumenting migration/sorption tests to help define the technological requirements in these areas. By the end of FY 1988, we had completed a review of the existing codes for simulating reactive transport; we are using the results of this review to help formulate plans for future activities in this area. The following sections describe the major RTP tasks and activities at LLNL in more detail, and they include our FY 1988 accomplishments in these areas. 8 refs., 22 figs

  19. LBNL Laboratory Directed Research and Development Program FY2016

    Energy Technology Data Exchange (ETDEWEB)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  20. Bibliography of Unclassified Reports: FY 1983.

    Science.gov (United States)

    1983-11-01

    selected automobile and motorcyclemagazines with a high proportion of readership in this age group. The strategy was evaluated by comparing the number of...climate of the human resource management ( HRM ) survey in compliance with the FY82 Navy Affirmative Action Plan. The most recent 1-year data base (I July...1980 to 30 June 1981) of HRM survey responses was used, yielding a sample of 35,690 personnel. The responses of whites and blacks, whites and

  1. Fusion Reactor Safety Research program. Annual report, FY-80

    International Nuclear Information System (INIS)

    Crocker, J.G.; Cohen, S.

    1981-06-01

    The report is in three sections. Outside contracts includes a report of newly-started study at the General Atomic Company to consider safety implications of low-activation materials, portions of two papers from ongoing work at PNL and ANL, reports of the lithium spill work at HEDL, the LITFIRE code development at MIT, and risk assessment at MIT, all of which are an expansion of FY-79 outside contracts. EG and G Activities includes adaptations of four papers of ongoing work in transient code development, tritium system risk assessment, heat transfer and fluid flow analysis, and fusion safety data base. Program Plan Development includes the Executive Summary of the Plan, which was completed in FY-80, and is accompanied by a list of publications and a brief outline of proposed FY-81 activities to be based on the Program Plan

  2. NCPV FY 1998 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R. D.; Hansen, A.

    1999-07-19

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals.

  3. NCPV FY 1998 Annual Report

    International Nuclear Information System (INIS)

    McConnell, R. D.; Hansen, A.

    1999-01-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals

  4. FY 2000 report on the survey of the development of high efficiency photoelectric conversion compounds. Plan on the Light for the 21st Century; 2000 nendo kokoritsu denko henkan kagobutsu handotai kaihatsu seika hokokusho. 21 seiki no akari keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper described the results of the FY 2000 R and D on the Plan on the Light for the 21st Century. For the purpose of developing the white light emitting diode lighting technology, the results were obtained in the following four items: 1) basic study on the light emitting mechanism; 2) epitaxial growth in blue light/ultra violet LED and evaluation of LED characteristics; 3) substrates and characteristics for homo-epitaxial growth; 4) basic characteristics of phosphor and white light LED lighting use light source. In 1), for the purpose of clarifying the light emitting mechanism in InGaN mixed crystal semiconductor and InGaN/GaN quantum well structure, temperature dependency of time resolved light emitting spectroscopy and selective excitation light emitting spectroscopy was measured to get information/knowledge. In 2), evaluated were characteristics of multi-quantum well UV-LED composed of AlGaN/InGaN. In 3), in the GaN crystal growth by the pressure control solution growth method, studied were effects of the increasing speed of nitrogen pressure on the size of GaN monocrystal and the surface state. In 4), verified were the measuring method of quantum efficiency of three primary color phosphor materials and problems on the measured values. (NEDO)

  5. Research on removal technologies of fuel debris and in-vessel structures using laser light (1). Research plan and research activities on FY2012

    International Nuclear Information System (INIS)

    Muramatsu, Toshiharu; Yamada, Tomonori; Hanari, Toshihide; Takebe, Toshihiko; Matsunaga, Yukihiro

    2013-08-01

    In decommissioning works of the Fukushima Daiichi nuclear power plants, it is required that fuel debris solidifying mixed materials of fuels and in-vessel structures should be removed. The fuel debris is considered to have characteristics, such as indefinite shapes, porous bodies, multi-compositions, higher hardness, etc. from the knowledge in decommissioning process of the Three Mile Island nuclear power plant. Laser lights are characterized by higher power density, local processability, remote controllability, etc. and can be performed thermal cutting and crushing-up for various materials which does not depend on fracture toughness. This report describes a research program and research activities in FY2012 aiming at developing removal system of fuel debris by the use of laser lights. Main results obtained from research activities in FY2012 are as follows: (1) Improvements of experimental infrastructures. A beam switching unit for an existing fiber laser system, an x-y-z tri-axes robot system to investigate remote control performances, and a particle image velocimetry (PIV) system for quantitation of assist gas flow characteristics were introduced to the experimental laboratory of our Applied Laser Technology Institute in Tsuruga. (2) Laser cutting performances for thick metal plates. To quantify laser cutting performance for thick metal plates of in-vessel structures, after the evaluation of the relationship between the kerf depth and amount of laser irradiation energy to the metal test piece, we evaluated for heat transfer behavior due to temperature measurement of thick metal plate on the laser cutting process. It is suggested that the heat diffusion into the cutting object can affect the heat input efficiency of the laser irradiation energy to kerf front. On the viewpoint of suppressing this thermal diffusion, it was found that it is important in improving the laser cutting performance to increase the ejection of molten metal by the assist gas, and to optimize

  6. NREL photovoltaic program FY 1997 annual report

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) going to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.

  7. Deficiencies in FY 1998 DOD Financial Statements and Progress Toward Improved Financial Reporting

    National Research Council Canada - National Science Library

    Lane, F

    1999-01-01

    The audit objectives were to identify and summarize the major deficiencies that prevented favorable audit opinions on the FY 1998 DoD financial statements and to identify the actions taken or planned...

  8. NITRD Program Supplement to the President`s Budget - FY 2017

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This document is a supplement to the President`s 2017 Budget Request to Congress. It describes the activities planned for FY2017 by the Federal agencies...

  9. NITRD Program Supplement to the President`s Budget - FY 2018

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This document is a supplement to the President`s 2018 Budget Request to Congress. It describes the activities planned for FY2018 by the Federal agencies...

  10. Exploratory Research and Development Fund, FY 1990

    International Nuclear Information System (INIS)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R ampersand D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R ampersand D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics

  11. Exploratory Research and Development Fund, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics.

  12. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    International Nuclear Information System (INIS)

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  13. FY97 ICCS prototype specification

    International Nuclear Information System (INIS)

    Woodruff, J.

    1997-01-01

    The ICCS software team will implement and test two iterations of their software product during FY97. This document specifies the products to be delivered in that first prototype and projects the direction that the second prototype will take. Detailed specification of the later iteration will be written when the results of the first iteration are complete. The selection of frameworks to be implemented early is made on a basis of risk analysis from the point of view of future development in the ICCS project. The prototype will address risks in integration of object- oriented components, in refining our development process, and in emulation testing for FEP devices. This document is a specification that identifies products and processes to undertake for resolving these risks. The goals of this activity are to exercise our development process at a modest scale and to probe our architecture plan for fundamental limits and failure modes. The product of the iterations will be the framework software which will be useful in future ICCS code. Thus the FY97 products are intended for internal usage by the ICCS team and for demonstration to the FEP software developers of the strategy for integrating supervisory software with FEP computers. This will be the first of several expected iterations of the software development process and the performance measurements that ICCS will demonstrate, intended to support confidence in our ability to meet project RAM goals. The design of the application software is being carried out in a separate WBS 1.5.2 activity. The design activity has as its FY97 product a series of Software Design Documents that will specify the functionality of the controls software of ICCS. During the testing of this year''s prototypes, the application functionality needed for test will be provided by sample maintenance controls. These are early precursors of controls that can be used for low level device control. Since the devices under test will be represented by

  14. Hearth monitoring project annual report for FY-1981

    International Nuclear Information System (INIS)

    Nieschmidt, E.B.; Lawrence, R.S.

    1981-08-01

    Progress during FY 1981 in the Hearth Monitoring project for the Idaho National Engineering Laboratory Transuranic Waste Treatment Facility is reported. Results of calculational, experimental and instrumental phases of the program are presented. Recommendations and plans for continuation of the program are displayed. Schedules for future efforts are included

  15. NREL Photovoltaic Program FY 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    1997-08-01

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's and the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.

  16. Summary of BISON Development Activities: NEAMS FY14 Report

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, R. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Novascone, S. R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hales, J. D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Spencer, B. W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Liu, W. [Anatech, Inc.; Pastore, G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Perez, D. M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gardner, R. J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Stafford, D. S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gamble, K. A. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This summary report contains an overview of work performed under the work package entitled “FY2014 NEAMS INL-Engineering Scale Fuel Performance & Interface with RPL Tools.” A first chapter identifies the specific FY-14 milestones, providing a basic description of the associated work and references to related detailed documentation. Where applicable, a representative technical result is provided. A second chapter summarizes substantial additional work including 1) efforts to improve numerical convergence and contact in BISON, 2) development of capability to simulate hydrogen behavior in Zircaloy cladding and 3) efforts to enhance collaborative work with the Halden Research Program. A final chapter briefly outlines planned future work.

  17. Oak Ridge National Laboratory institutional plan FY 1985-FY 1990

    International Nuclear Information System (INIS)

    1984-11-01

    The primary mission of ORNL is to carry out applied research and engineering in fusion, fission, and other energy technologies, and scientific research in basic physical and life sciences. ORNL designs and provides research facilities. An important part of ORNL's mission is the manufacture and sale of radioactive and stable isotopes that are not available from the private sector. To fulfull its mission, ORNL focuses its scientific and technical efforts on: (1) magnetic fusion, with emphasis on applied plasma physics, experimental and design studies of confinement configurations, development of plasma heating and fueling systems, development of prototype superconducting confinement magnets, and testing of candidate first-wall and blanket materials; (2) nuclear fission, focused on development of nuclear fuel reprocessing, materials testing and development for high-temperature gas-cooled and advanced converter reactors, and technologies for managing nuclear waste; (3) biological and environemental research, with emphasis on interaction of energy-related physical and chemical agents with living organisms; (4) conservation and renewable energy, with emphasis on generic research for high-temperature materials, power systems, biomass production, energy storage, and technology development for buildings and industry; (5) fossil energy, focused on development of materials for fossil fuel applications and on health and environmental effects of coal conversion systems; and (6) basic research in physical sciences, with emphasis in materials research on radiation effects, neutron scattering, and photovoltaic conversion; in chemical science on aqueous solutions; and in nuclear physics on heavy-ion reactions

  18. Tanks focus area multiyear program plan FY97-FY99

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. The focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE's national tank system. The TFA is responsible for technology development to support DOE's four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure

  19. Oak Ridge National Laboratory Institutional Plan, FY 1991--FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-01

    The Oak Ridge National Laboratory -- one of DOE's major multiprogram laboratories -- focuses its resources on energy research and development (R D). To be able to meet these R D challenges, the Laboratory must achieve excellence in its operations relative to environmental, safety, and health (ES H) protection and to restore its aging facility infrastructure. ORNL's missions are carried out in compliance with all applicable ES H regulations. The Laboratory conducts applied R D in energy technologies -- in conservation; fission; magnetic fusion; health and environmental protection; waste management; renewable resources; and fossil energy. Experimental and theoretical research is undertaken to investigate fundamental problems in physical, chemical, materials, computational, biomedical, earth, and environmental sciences; to advance scientific knowledge; and to support energy technology R D. ORNL designs, builds, and operates unique research facilities for the benefit of university, industrial, and national laboratory researchers. The Laboratory serves as a catalyst in bringing national and international research elements together for important scientific and technical collaborations. ORNL helps to prepare the scientific and technical work force of the future by offering innovative and varied learning and R D experiences at the Laboratory for students and faculty from preschool level through postdoctoral candidates. The transfer of science and technology to US industries and universities is an integral component of ORNL's R D missions. ORNL also undertakes research and development for non-DOE sponsors when such work is synergistic with DOE mission. 66 figs., 55 tabs.

  20. Oak Ridge National Laboratory Institutional Plan, FY 1991--FY 1996

    International Nuclear Information System (INIS)

    1991-02-01

    The Oak Ridge National Laboratory -- one of DOE's major multiprogram laboratories -- focuses its resources on energy research and development (R ampersand D). To be able to meet these R ampersand D challenges, the Laboratory must achieve excellence in its operations relative to environmental, safety, and health (ES ampersand H) protection and to restore its aging facility infrastructure. ORNL's missions are carried out in compliance with all applicable ES ampersand H regulations. The Laboratory conducts applied R ampersand D in energy technologies -- in conservation; fission; magnetic fusion; health and environmental protection; waste management; renewable resources; and fossil energy. Experimental and theoretical research is undertaken to investigate fundamental problems in physical, chemical, materials, computational, biomedical, earth, and environmental sciences; to advance scientific knowledge; and to support energy technology R ampersand D. ORNL designs, builds, and operates unique research facilities for the benefit of university, industrial, and national laboratory researchers. The Laboratory serves as a catalyst in bringing national and international research elements together for important scientific and technical collaborations. ORNL helps to prepare the scientific and technical work force of the future by offering innovative and varied learning and R ampersand D experiences at the Laboratory for students and faculty from preschool level through postdoctoral candidates. The transfer of science and technology to US industries and universities is an integral component of ORNL's R ampersand D missions. ORNL also undertakes research and development for non-DOE sponsors when such work is synergistic with DOE mission. 66 figs., 55 tabs

  1. Oak Ridge National Laboratory institutional plan, FY 1990--FY 1995

    Energy Technology Data Exchange (ETDEWEB)

    1989-11-01

    The Oak Ridge National Laboratory is one of DOE's major multiprogram energy laboratories. ORNL's program missions are (1) to conduct applied research and engineering development in support of DOE's programs in fusion, fission, fossil, renewables (biomass), and other energy technologies, and in the more efficient conversion and use of energy (conservation) and (2) to perform basic scientific research in selected areas of the physical and life sciences. These missions are to be carried out in compliance with environmental, safety, and health regulations. Transfer of science and technology is an integral component of our missions. A complementary mission is to apply the Laboratory's resources to other nationally important tasks when such work is synergistic with the program missions. Some of the issues addressed include education, international competitiveness, hazardous waste research and development, and selected defense technologies. In addition to the R D missions, ORNL performs important service roles for DOE; these roles include designing, building, and operating user facilities for the benefit of university and industrial researchers and supplying radioactive and stable isotopes that are not available from private industry. Scientific and technical efforts in support of the Laboratory's missions cover a spectrum of activities. In fusion, the emphasis is on advanced studies of toroidal confinement, plasma heating, fueling systems, superconducting magnets, first-wall and blanket materials, and applied plasma physics. 69 figs., 49 tabs.

  2. Optimal imaging for treaty verification FY2014 annual report

    International Nuclear Information System (INIS)

    Hilton, Nathan R.; Johnson, William C.; Brubaker, Erik M.; Kupinski, Matthew Alan; MacGahan, Christopher Jonathan

    2014-01-01

    FY2014 technical report of our project funded by DNN R&D that leverages advanced inference methods developed for medical and adaptive imaging to address arms control applications. We seek a method to acquire and analyze imaging data of declared treaty-accountable items without creating an image of those objects or otherwise storing or revealing any classified information. Such a method would avoid the use of classified-information barriers. We present our progress on FY2014 tasks defined in our life-cycle plan. We also describe some future work that is part of the continuation of this project in FY2015 and beyond as part of a venture that joins ours with a related PNNL project.

  3. The Seismic Category I Structures Program results for FY 1987

    International Nuclear Information System (INIS)

    Farrar, C.R.; Bennett, J.G.; Dunwoody, W.E.; Baker, W.E.

    1990-10-01

    The accomplishments of the Seismic Category I Structures Program for FY 1987 are summarized. These accomplishments include the quasi-static load cycle testing of large shear wall elements, an extensive analysis of previous data to determine if equivalent linear analytical models can predict the response of damaged shear wall structures, and code committee activities. In addition, previous testing and results that led to the FY 1987 program plan are discussed and all previous data relating to shear wall stiffness are summarized. Because separate reports have already summarized the experimental and analytical work in FY 1987, this report will briefly highlight this work and the appropriate reports will be references for a more detailed discussion. 12 refs., 23 figs., 18 tabs

  4. Optimal imaging for treaty verification FY2014 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hilton, Nathan R. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Johnson, William C. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Brubaker, Erik M. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Kupinski, Matthew Alan [Univ. of Arizona, Tucson, AZ (United States); MacGahan, Christopher Jonathan [Univ. of Arizona, Tucson, AZ (United States)

    2014-10-01

    FY2014 technical report of our project funded by DNN R&D that leverages advanced inference methods developed for medical and adaptive imaging to address arms control applications. We seek a method to acquire and analyze imaging data of declared treaty-accountable items without creating an image of those objects or otherwise storing or revealing any classified information. Such a method would avoid the use of classified-information barriers. We present our progress on FY2014 tasks defined in our life-cycle plan. We also describe some future work that is part of the continuation of this project in FY2015 and beyond as part of a venture that joins ours with a related PNNL project.

  5. The FY2011 Federal Budget

    Science.gov (United States)

    2010-08-04

    long been the largest source of federal revenues, followed by social insurance (payroll) taxes. Federal individual and corporate income tax revenues...915 billion (6.4% of GDP). Corporate income tax revenues fell from $304 billion in FY2008 to $138 billion in FY2009. Federal revenues from other

  6. Quarterly report on program cost and schedule: Fourth quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Major program milestones completed in the fourth quarter of FY 1988 include completed preliminary draft NWPAA Section 175 Impacts Report, completed Title I ESF design, completed site reclamation in Texas, distributed review draft of the Dry Cask Storage Study, completed draft and final FY 1990 OMB budget, issued FY 1987 Annual Report to Congress, issued four draft Environmental Field Activity Plans, issued draft Environmental Program Overview, and made grant payments to local governments under Section 116 of NWPA, as amended. Major accomplishments during the fourth quarter of FY 1988 are listed. The Water Appropriation Permit Application was filed with the Nevada State Engineer on July 21, 1988. Installation and checkout of the Prototype Engineered Barrier Test equipment in G-tunnel is continuing with an expected early September test initiation data. The Configuration Management Plan was sent to DOE/HQ for approval. The prototype facility for testing the horizontal waste package emplacement configuration was completed in the G-tunnel

  7. Surveillance and maintenance plan for Waste Area Groupings at Oak Ridge National Laboratory, Oak Ridge, Tennessee, for FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.; Jones, R.G.

    1992-12-01

    The Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) Surveillance and Maintenance (S ampersand M) program was designed for the management of sites contaminated with radioactive materials and/or hazardous chemicals from the end of their operating life until final facility disposition or site stabilization in accordance with environmental regulations and good management practices. Program objectives include (1) S ampersand M of sites/facilities awaiting final disposition; (2) planning for safe and orderly final closure at each site/facility; and (3) implementing a program to accomplish final disposition in a safe, cost-effective, and timely manner

  8. Irradiation Planning for Fully-Ceramic Micro-encsapsulated fuel in ATR at LWR-relevant conditions: year-end report on FY-2011

    International Nuclear Information System (INIS)

    Ougouag, Abderrafi M.; Sen, R. Sonat; Pope, Michael A.; Boer, Brian

    2011-01-01

    This report presents the estimation of required ATR irradiation levels for the DB-FCM fuel design (fueled with Pu and MAs). The fuel and assembly designs are those considered in a companion report [R. S. Sen et al., FCRandD-2011- 00037 or INL/EXT-11-23269]. These results, pertaining to the DB-FCM fuel, are definitive in as much as the design of said fuel is definitive. In addition to the work performed, as required, for DB-FCM fuel, work has started in a preliminary fashion on single-cell UO2 and UN fuels. These latter activities go beyond the original charter of this project and although the corresponding work is incomplete, significant progress has been achieved. However, in this context, all that has been achieved is only preliminary because the corresponding fuel designs are neither finalized nor optimized. In particular, the UO2 case is unlikely to result in a viable fuel design if limited to enrichment at or under 20 weight % in U-235. The UN fuel allows reasonable length cycles and is likely to make an optimal design possible. Despite being limited to preliminary designs and offering only preliminary conclusions, the irradiation planning tasks for UO2 and UN fuels that are summarized in this report are useful to the overall goal of devising and deploying FCM-LWR fuel since the methods acquired and tested in this project and the overall procedure for planning will be available for planning tests for the finalized fuel design. Indeed, once the fuel design is finalized and the expected burnup level is determined, the methodology that has been assembled will allow the prompt finalization of the neutronic planning of the irradiation experiment and would provide guidance on the expected experimental performance of the fuel. Deviations from the expected behavior will then have to be analyzed and the outcome of the analysis may be corrections or modifications for the assessment models as well as, possibly, fuel design modifications, and perhaps even variation of

  9. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  10. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Science.gov (United States)

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  11. FY 2009 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2009 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  12. FY 2010 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2010 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  13. FY 2011 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2011 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  14. FY 2008 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2008 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  15. LSTA Allotments (FY 2003-2016)

    Data.gov (United States)

    Institute of Museum and Library Services — Review Library Services and Technology Act (LSTA) allotments by state from FY 2003 to FY 2016. The Grants to States program is the largest source of federal funding...

  16. Review of research on advanced computational science in FY2016

    International Nuclear Information System (INIS)

    2017-12-01

    Research on advanced computational science for nuclear applications, based on “Plan to Achieve Medium- to Long-term Objectives of the Japan Atomic Energy Agency (Medium- to Long-term Plan)”, has been performed at Center for Computational Science and e-Systems (CCSE), Japan Atomic Energy Agency. CCSE established the committee consisting of outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the followings. (1) Results of the R and D performed at CCSE in FY 2016 (April 1st, 2016 - March 31st, 2017), (2) Results of the evaluation on the R and D by the committee in FY 2016. (author)

  17. Review of research on advanced computational science in FY2015

    International Nuclear Information System (INIS)

    2017-01-01

    Research on advanced computational science for nuclear applications, based on 'Plan to Achieve Medium- to Long-term Objectives of the Japan Atomic Energy Agency (Medium- to Long-term Plan)', has been performed at Center for Computational Science and e-Systems (CCSE), Japan Atomic Energy Agency. CCSE established the committee consisting of outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the followings. (1) Results of the R and D performed at CCSE in FY 2015 (April 1st, 2015 - March 31st, 2016), (2) Results of the evaluation on the R and D by the committee in FY 2015 (April 1st, 2015 - March 31st, 2016). (author)

  18. DOE Hazardous Waste Remedial Actions Program: Annual report, FY 1986

    International Nuclear Information System (INIS)

    Eyman, L.D.

    1987-05-01

    The activities of HAZWRAP for the past fiscal year were organized into seven principal areas: technical analysis and technology transfer; regulatory analysis; strategic planning;information systems; program administration; technology adaptation; and technology demonstration. The scope, major FY 1986 accomplishments, and future directions for each of these areas are described in the following sections of this report. Listings of reports produced through the SCO are given in Appendixes A and B for the current year and since the program started, respectively

  19. Used Fuel Disposition in Crystalline Rocks: FY16 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Y. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Kalinina, Elena Arkadievna [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jerden, James L. [Argonne National Lab. (ANL), Argonne, IL (United States); Copple, Jacqueline M. [Argonne National Lab. (ANL), Argonne, IL (United States); Cruse, T. [Argonne National Lab. (ANL), Argonne, IL (United States); Ebert, W. [Argonne National Lab. (ANL), Argonne, IL (United States); Buck, E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Eittman, R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tinnacher, R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Tournassat, Christophe [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Davis, J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Viswanathan, H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Chu, S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dittrich, T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hyman, F. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Karra, S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Makedonska, N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Reimus, P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Zavarin, Mavrik [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Joseph, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-21

    The objective of the Crystalline Disposal R&D Work Package is to advance our understanding of long-term disposal of used fuel in crystalline rocks and to develop necessary experimental and computational capabilities to evaluate various disposal concepts in such media. FY16 continued to be a successful year in both experimental and modeling arenas in evaluation of used fuel disposal in crystalline rocks. The work covers a wide range of research topics identified in the R&D plan.

  20. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams.

  1. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    International Nuclear Information System (INIS)

    1994-09-01

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams

  2. ASC FY17 Implementation Plan, Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, P. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-14

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources that support annual stockpile assessment and certification, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions.

  3. TRAC FY15 Research Planning and Elicitation

    Science.gov (United States)

    2014-09-30

    and roof tops), through UGFs/ UGTs (entrances, halls, rooms, hole drops/climbs and stairs), between buildings (tunnels, courtyards, alleys, rooftops...Examine decision-making and leadership research to determine possible gaps between academic theories and modeling and simulation efforts. Seek to improve

  4. Audit and Evaluation Plan FY 2001

    National Research Council Canada - National Science Library

    2000-01-01

    .... As part of this objective, will review the reporting of performance measures in the Overview section of the DoD Agency-wide Financial Statements and in the preparation of the Statements of Net Costs...

  5. Institutional Plan FY 1999-2003

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.

    1999-02-08

    Computational science is becoming an increasingly important component of Pacific Northwest's support to DOE's major missions. The advanced parallel computing systems in the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), coupled with new modeling and simulation software, data management tools, and user interfaces, are providing solutions to previously intractable problems. Research focuses on developing software and other tools to address computational challenges in molecular science, environmental management, global climate change, advanced materials and manufacturing processes, molecular biology, and information management. The Graphics and Visualization Laboratory is part of EMSL'S Molecular Science Computing Facility (MSCF). The MSCF contains a 512-processor IBM RISC System/6000 scalable power parallel computer system that provides the advanced computing capability needed to address ''Grand Challenge'' environmental research problems. The MSCF provides an integrated computing environment with links to facilities in the DOE complex, universities, and industry. The image inserts are graphical representations of simulations performed with software developed at the Laboratory.

  6. HTGR generic technology program plan (FY 80)

    International Nuclear Information System (INIS)

    1980-01-01

    Purpose of the program is to develop base technology and to perform design and development common to the HTGR Steam Cycle, Gas Turbine, and Process Heat Plants. The generic technology program breaks into the base technology, generic component, pebble-bed study, technology transfer, and fresh fuel programs

  7. Photovoltaic Subcontract Program, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K.A. (ed.)

    1991-03-01

    This report summarizes the progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaics Program at the Solar Energy Research Institute (SERI). The SERI subcontracted PV research and development represents most of the subcontracted R D that is funded by the US Department of Energy (DOE) National Photovoltaics Program. This report covers fiscal year (FY) 1990: October 1, 1989 through September 30, 1990. During FY 1990, the SERI PV program started to implement a new DOE subcontract initiative, entitled the Photovoltaic Manufacturing Technology (PVMaT) Project.'' Excluding (PVMaT) because it was in a start-up phase, in FY 1990 there were 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of those subcontracts were with universities, at a total funding of over $3.3 million. Cost sharing by industry added another $4.3 million to that $11.9 million of SERI PV subcontracted R D. The six technical sections of this report cover the previously ongoing areas of the subcontracted program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs discuss approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports the progress since its inception in FY 1990. Highlights of technology transfer activities are also reported.

  8. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  9. Decontamination and decommissioning activities photobriefing book FY 1998

    International Nuclear Information System (INIS)

    1999-01-01

    Fiscal Year (FY) 1998 was very successful in terms of Decontamination and Decommissioning (D and D) project completions. This photobriefing book highlights these projects and activities in one ongoing project. Brief descriptions of projects planned for the future are also provided. Two D and D projects funded by the US DOE Office of Environmental Management (EM-40) were completed safely and on schedule in FY 1998: (1) Argonne Thermal Source Reactor (ATSR) was a low-power research reactor that operated from 1950 to 1989; and (2) The Building 594 (a.k.a. 579) Waste Ion-Exchange Facility was an obsolete facility constructed in the 1950s to process waste fluids from a collecting lagoon. Field work at one project was ongoing during FY 1998: (1) Chicago Pile 5 (CP-5) was a 5-megawatt, heavy water-moderated, enriched uranium-fueled reactor used to produce neutrons for scientific research from 1954-79. The reactor was shut down and defueled in 1979. D and D is scheduled to be completed in FY 2000. Project experience has lent itself to developing unique staff capabilities. The D and D group was chosen as lead organization for a project supported with operating funds provided by Argonne's Plant Facilities and Services (PFS) Division. This project was also completed safely and on schedule in FY 1998: (1) The Building 200/205 Pneumatic Transfer Tube was constructed in the late 1960s between Hot Cell M-4 in Building 200 and a glove box in Room F-131, Building 205, and used to transfer irradiated fuel specimens and other samples between the two buildings

  10. Tanks Focus Area Site Needs Assessment - FY 2001

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.; Nickola, Cheryl L.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, from collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.

  11. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    International Nuclear Information System (INIS)

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail

  12. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  13. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Will [comp.

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

  14. FY 1997 cost savings report

    International Nuclear Information System (INIS)

    Sellards, J.B.

    1998-01-01

    With the end of the cold war, funding for the Environmental Management program increased rapidly as nuclear weapons production facilities were shut down, cleanup responsibilities increased, and facilities were transferred to the cleanup program. As funding for the Environmental Management (EM) program began to level off in response to Administration and Congressional efforts to balance the Federal budget, the program redoubled its efforts to increase efficiency and get more productivity out of every dollar. Cost savings and enhanced performance are an integral pair of Hanford Site operations. FY1997 was the third year of a cost savings program that was initially defined in FY 1995. The definitions and process remained virtually the same as those used in FY 1996

  15. Supporting Data Amended FY 1992/FY 1993 Biennial Budget Estimate Submitted to Congress - January 1992. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation

    Science.gov (United States)

    1992-01-01

    dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U

  16. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  17. Active Sites Environmental Monitoring Program. FY 1993: Annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Ashwood, T.L.; Hicks, D.S.; Marsh, J.D.

    1994-08-01

    This report continues a series of annual and semiannual reports that present the results of the Active Sites Environmental Monitoring Program (ASEMP) monitoring activities. The report details monitoring data for fiscal year (FY) 1993 and is divided into three major areas: SWSA 6 [including tumulus pads, Interim Waste Management Facility (IWMF), and other sites], the low-level Liquid-Waste Solidification Project (LWSP), and TRU-waste storage facilities in SWSA 5 N. The detailed monitoring methodology is described in the second revision of the ASEMP program plan. This report also presents a summary of the methodology used to gather data for each major area along with the results obtained during FY 1993

  18. Laboratory Directed Research and Development Program FY2011

    Energy Technology Data Exchange (ETDEWEB)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports the Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.

  19. Pilot chargeback system program plan

    International Nuclear Information System (INIS)

    Smith, P.

    1997-03-01

    This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management

  20. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); Mizell, Steve [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Las Vegas, NV (United States); Campbell, Scott [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-09-01

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

  1. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    International Nuclear Information System (INIS)

    Miller, Julianne J.; Nikolich, George; Mizell, Steve; McCurdy, Greg; Campbell, Scott

    2016-01-01

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

  2. UMTRA water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to provide background, guidance, and justification for fiscal year (FY) 1994 water sampling activities for the uranium mil tailings site at Tuba City, Arizona. This sampling and analysis plan will form the basis for groundwater sampling and analysis work orders to be implemented in FY94

  3. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  4. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  5. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  6. 75 FR 69134 - Submission for OMB Review, Comment Request, Proposed Collection: Public Libraries Survey, FY 2011...

    Science.gov (United States)

    2010-11-10

    ..., Office of Policy, Planning, Research, and Communication, Institute of Museum and Library Services, 1800 M..., Proposed Collection: Public Libraries Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services.... SUMMARY: The Institute of Museum and Library Services announces the following information collection has...

  7. 75 FR 51853 - Notice of Proposed Information Collection Requests: Public Libraries Survey, FY 2011-2013

    Science.gov (United States)

    2010-08-23

    ..., Office of Policy, Planning, Research, and Communication, Institute of Museum and Library Services, 1800 M..., Research, and Communication, Institute of Museum and Library Services, 1800 M Street, NW., 9th Floor... Requests: Public Libraries Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services, National...

  8. Shippingport Station Decommissioning Project: FY 1988 annual progress report, October 1, 1987--September 30, 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1988. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedular considerations. 4 refs., 17 figs., 2 tabs

  9. 77 FR 4337 - Notice of the FY 2011 Substantial Amendment Process and Other Related Information for Recipients...

    Science.gov (United States)

    2012-01-27

    ... Program Funds AGENCY: Office of Assistant Secretary for Community Planning and Development, HUD. ACTION... ESG, please submit them to the HUD Homelessness Resource Exchange Virtual Help Desk at http://www.... Mercedes M. M[aacute]rquez, Assistant Secretary for Community Planning and Development. Appendix A: FY 2011...

  10. Report on the results of the FY 1998 hydrogen utilization international clean energy system technology (WE-NET). Subtask 1. Survey/research for the comprehensive evaluation and developmental plan; 1998 nendo suiso riyo kokusai clean energy system gijutsu (WE-NET). 1. Sogo hyoka to kaihatsu keikaku no tame no chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The paper described the results of the FY 1998 WE-NET project survey. WE-NET is composed of various element technologies such as hydrogen production, hydrogen transportation, storage technology, low-temperature materials, hydrogen utilization, and hydrogen combustion turbine technology. Therefore, considering the effectiveness as a total system, it is extremely important to traversally evaluate the situation of the R and D of each technology and developmental achievements and to work out developmental plans with integration, considering the effectiveness as a total system. From viewpoints of making effective promotion of the project and attempting optimization as a total system, it is necessary to make organic/comprehensive connection and adjustment among individual subtasks all the time. In this survey/research, in the case of proceeding with the above-mentioned studies, a committee having knowledgeable persons and learned persons as members was established. There, an investigational study was conducted over the whole WE-NET structural technology, and at the same time the following were attempted: the constant/mobile comprehensive adjustment of the whole project, evaluation of the developmental results, and optimization of the developmental plans. The results obtained in 6 years of Period I were evaluated traversally and comprehensively, and how to proceed with the development in Period II was proposed, which showed the developmental continuity. (NEDO)

  11. Photovoltaic Subcontract Program, FY 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report summarizes the fiscal year (FY) 1991 (October 1, 1990, through September 30, 1991) progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL) -- formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, the University Participation Program, and the Photovoltaic Manufacturing Technology (PVMaT) project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1991, and future research directions.

  12. FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Randy R. LaBarge

    1999-11-05

    This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positive progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.

  13. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  14. Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the S&H resources that support these activities. The fiscal year (FY) 1999 and 2000 information (Sieracki 1999) and data contained in the ''Hanford Site Environment, Safety and Health Fiscal Year 2001 Budget-Risk Management Summary'' (RL 1999) were the basis for preparing this report. Fiscal year 2000 finding of Office of Environmental Management (EM) and Office of Nuclear Energy, Science and Technology (NE) activities is based on the President's budget of $1,065.1 million and $28.0 million, plus $2.7 million carryover finding, respectively, as of October 31, 1999. Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2002 ES&H Budget-Risk Management Summary to be issued in May 2000. This report provides the end-of-year status of FY 1999 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2000 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H ''Guidance for FY200l Budget Formulations and Execution'' (DOE 1999).

  15. Ethanol annual report FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    Texeira, R.H.; Goodman, B.J. (eds.)

    1991-01-01

    This report summarizes the research progress and accomplishments of the US Department of Energy (DOE) Ethanol from Biomass Program, field managed by the Solar Energy Research Institute, during FY 1990. The report includes an overview of the entire program and summaries of individual research projects. These projects are grouped into the following subject areas: technoeconomic analysis; pretreatment; cellulose conversion; xylose fermentation; and lignin conversion. Individual papers have been indexed separately for inclusion on the data base.

  16. CAES Annual Report FY 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kortny Rolston

    2011-10-01

    The Center for Advanced Energy Studies was created to lead research programs important to the nation, attract students and faculty to the Idaho universities and act as a catalyst for technology-based economic development. CAES is striving to meet those goals by continuing to develop its infrastructure and equipment capabilities, expand its research portfolio and bolster Idaho's energy workforce. This Annual Report details the progress CAES made in FY 2011 toward fulfilling its research, education and economic development missions.

  17. Federal Research and Development Funding: FY2014

    Science.gov (United States)

    2014-02-19

    1.12 billion for FY2014. The FY2014 request proposed $155 million to replace the agency’s Southeast Poultry Disease Research Laboratory in Athens...formula funding, and special grants. 94 U.S. Department of Agriculture, “Statement by Thomas J

  18. Annual Progress Report FY-82. Volume I.

    Science.gov (United States)

    1982-01-01

    Comparison of Binaural Versus 316 Monaural Amplification. (FY-81PI) 2535 Development of Method for Generating 318 Individualized Aural Rehabilitation...Oncology Group. 428 (FY-74 I ) 4116 The Evaluation of Petal Systolic Time Intervals 429 and Beat interval Variation in Fetal heart Rate as Early

  19. Nevada Nuclear Waste Storage Investigations. FY 1979 peer review summaries and related documentation

    International Nuclear Information System (INIS)

    1980-06-01

    The NNWSI FY 1979 Project Plan (NVO-196-9) describes the accomplishment plan and objectives of the FY 1979 investigations. Three critical tasks and one critical subtask were selected by Project management for in-depth external peer review at meetings held at the DOE/NV in Las Vegas. The four technical peer review meetings held during FY 1979 were conducted to obtain an external assessment of the sufficiency and quality of the four selected critical investigative segments of the NNWSI. Peer reviewers representing appropriate fields of expertise were invited to attend each meeting. Within about two weeks of each meeting, the invited reviewers summarized their impressions of the technical activities presented to them and transmitted their summaries and recommendations to DOE/NV by letter. This document is a compilation, according to the individual meetings, of all correspondence between reviewers and Project personnel that is relevant to the technical activities of the NNWSI. The section for each meeting briefly summarizes the major activities of the NNWSI being reviewed and the effects of the reviewers comments and recommendations on Project planning. Each section also includes a list of the invited peer reviewers, a meeting agenda, and a copy of all technical correspondence relating to the review meeting. General impressions of the overall peer review process and improvements to be incorporated into future peer review activities are discussed in the next section as an introduction to the four subsequent sections which are devoted to the individual FY 1979 peer reviews

  20. FY16 Analysis report: Financial systems dependency on communications

    Energy Technology Data Exchange (ETDEWEB)

    Beyeler, Walter E.

    2017-03-01

    Within the Department of Homeland Security (DHS), the Office of Cyber and Infrastructure Analysis (OCIA)'s National Infrastructure Simulation and Analysis Center (NISAC) develops capabilities to support the DHS mission and the resilience of the Nation’s critical infrastructure. At Sandia National Laboratories, under DHS/OCIA direction, NISAC is developing models of financial sector dependence on communications. This capability is designed to improve DHS's ability to assess potential impacts of communication disruptions to major financial services and the effectiveness of possible mitigations. This report summarizes findings and recommendations from the application of that capability as part of the FY2016 NISAC program plan.

  1. Review of research on simulation engineering in FY2007

    International Nuclear Information System (INIS)

    2009-02-01

    Research on simulation engineering for nuclear applications, based on the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the result of the evaluation by the committee on the research on simulation engineering performed at CCSE/JAEA in FY2007. (author)

  2. Review of research on simulation engineering in FY2008

    International Nuclear Information System (INIS)

    2010-02-01

    Research on simulation engineering for nuclear applications, based on 'the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the result of the evaluation by the committee on the research on simulation engineering performed at CCSE/JAEA in FY2008. (author)

  3. Advanced Planning Briefing for Industry Proceedings, 15-16 September 1987.

    Science.gov (United States)

    1987-09-01

    effort, 3 demos planned for FY88, and concept studies continuing on the under armor mortar concepts. We need your participation in pursuing innovative...our under armor mortar concepts, and continued emphasis on automation and crew reduction in future self- propelled artillery systems. Thank you for...activity relating to some as-of-yet unknown composite technology. The under armor mortar may also be a full fledged program in the FY89 to FY93

  4. FY 1990/FY 1991 Biennial Budget Descriptive Summaries for the Strategic Defense Initiative Organization

    Science.gov (United States)

    1989-01-01

    reduction in cryccooler size. o (U) Develop the first diamond ME_2 with monocrystalline , semiconductor quality thin-film diamcnd. o (U) Develop Atomic Layer...stiffness and dynamic response. A lightweight thermal radiator panel will also be fabricated and tested. Fabrication of tubes and sheets in gauges...FY 91 o Precision Gimbal Test IQ FY 91 C Cx:mlete Deveic..ent of Integrated Structures Model 2Q FY 91 c Light’weight Ccmpcsitas Radiator Panel Demo 2Q

  5. Geothermal-subsidence research program plan and review

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  6. Test plan for engineering scale electrostatic enclosure demonstration

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan

  7. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    International Nuclear Information System (INIS)

    Hooper, E.B.; Hill, D.N.

    2000-01-01

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T c and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive

  8. Waste-isolation projects, FY 1978

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1979-01-01

    This report describes Lawrence Livermore Laboratory (LLL) activities during FY 1978 in support of the National Waste Terminal Storage Program. Current projects at LLL fall into three categories: (1) field testing, (2) laboratory rock mechanics measurements, and (3) laboratory studies of sorption and leaching. Field test activities conducted in the Climax granite at the Nevada Test Site included electrical heater tests, preparation for a spent-fuel-storage test, and planning for a series of rock mechanics tests. The heater tests determined the in situ thermal properties of Climax granite and its in situ permeability as a function of rock temperature. The two main laboratory rock mechanics projects involved (1) measurement of the permeability, electrical conductivity, and acoustic velocity of 15-cm-diam cores of granitic rocks over a range of confining pressure, pore (water) pressure, and deviatoric stress, and (2) measurement of rock thermal properties as a function of temperature and confining pressure in the presence of pore fluids to 770 0 K and 200 Mpa. The leaching studies made use of an LLL-designed, single-pass leaching apparatus with three solutions, two leach temperatures, and three flow rates. The material evaluated was Np--Pu-doped simulated waste glass from Battelle Pacific Northwest Laboratories. The sorption studies involved standard static measurements of the equilibrium distribution coefficient (K/sub d/) for various radionuclides on a variety of rocks, and flow-through-core studies of dynamic sorption

  9. Advanced Fuels Campaign FY 2010 Accomplishments Report

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase

    2010-12-01

    The Fuel Cycle Research and Development (FCRD) Advanced Fuels Campaign (AFC) Accomplishment Report documents the high-level research and development results achieved in fiscal year 2010. The AFC program has been given responsibility to develop advanced fuel technologies for the Department of Energy (DOE) using a science-based approach focusing on developing a microstructural understanding of nuclear fuels and materials. The science-based approach combines theory, experiments, and multi-scale modeling and simulation aimed at a fundamental understanding of the fuel fabrication processes and fuel and clad performance under irradiation. The scope of the AFC includes evaluation and development of multiple fuel forms to support the three fuel cycle options described in the Sustainable Fuel Cycle Implementation Plan4: Once-Through Cycle, Modified-Open Cycle, and Continuous Recycle. The word “fuel” is used generically to include fuels, targets, and their associated cladding materials. This document includes a brief overview of the management and integration activities; but is primarily focused on the technical accomplishments for FY-10. Each technical section provides a high level overview of the activity, results, technical points of contact, and applicable references.

  10. Cementitious Barriers Partnership FY2013 End-Year Report

    Energy Technology Data Exchange (ETDEWEB)

    Flach, G. P. [Savannah River Site (SRS), Aiken, SC (United States); Langton, C. A. [Savannah River Site (SRS), Aiken, SC (United States); Burns, H. H. [Savannah River Site (SRS), Aiken, SC (United States); Smith, F. G. [Savannah River Site (SRS), Aiken, SC (United States); Kosson, D. S. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Brown, K. G. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Samson, E. [SIMCO Technologies, Inc., Quebec (Canada); Meeussen, J. C.L. [Nuclear Research and Consultancy Group (NRG), Petten (The Netherlands); van der Sloot, H. A. [Hans van der Sloot Consultancy, Langedijk (The Netherlands); Garboczi, E. J. [Materials & Construction Research Division, National Institute of Standards and Technology, Gaithersburg, MD (United States)

    2013-11-01

    In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOE applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non-fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant

  11. Advanced Energy Projects FY 1990 research summaries

    International Nuclear Information System (INIS)

    1990-09-01

    This report serves as a guide to prepare proposals and provides summaries of the research projects active in FY 1990, sponsored by the Office of Basic Energy Sciences Division of Advanced Energy Projects, Department of Energy. (JF)

  12. Multifamily Hubs' Initial Endorsements FY12

    Data.gov (United States)

    Department of Housing and Urban Development — Describes the program, geographic & lender distribution of multifamily loans initially endorsed for FHA insurance or risk sharing in FY 12. A loan is initially...

  13. Engineered Barrier Testing at the INEEL Engineered Barriers Test Facility: FY-1997 and FY-1998

    International Nuclear Information System (INIS)

    Keck, K. N.; Porro, I.

    1998-01-01

    techniques are described. The wetting tests were designed to stress the test plots to the maximum by forcing drainage to occur. Drainage generally occurred two to three days following the start of the wetting test. Drainage from the capillary/biobarrier test plots stopped sooner than drainage from the thick soil test plots. Similar results were observed in drainage data collected in FY-98 following the spring thaw. Drainage from the capillary/biobarrier test plots following the winter of 1998 represents about one-third of the precipitation occurring during that period compared to two-thirds of the precipitation from the thick soil test plots. By limiting drainage, the capillary/biobarriers increased water storage in the upper portions of the test plots compared to the thick soil barriers. The data evaluated in this report come from an ongoing project. The aftereffects of the wetting tests continue to be monitored. Long-term monitoring under ambient conditions, the application of additional treatments to the test plots, and numerical modeling are planned for the future

  14. Organic analysis progress report FY 1997

    Energy Technology Data Exchange (ETDEWEB)

    Clauss, S.A.; Grant, K.E.; Hoopes, V.; Mong, G.M.; Steele, R.; Bellofatto, D.; Sharma, A.

    1998-04-01

    The Organic Analysis and Methods Development Task is being conducted by Pacific Northwest National Laboratory (PNNL) as part of the Organic Tank Waste Safety Project. The objective of the task is to apply developed analytical methods to identify and/or quantify the amount of particular organic species in tank wastes. In addition, this task provides analytical support for the Gas Generation Studies Task, Waste Aging, and Solubility Studies. This report presents the results from analyses of tank waste samples archived at Pacific Northwest National Laboratory (PNNL) and received from the Project Hanford Management Contractor (PHMC), which included samples associated with both the Flammable Gas and Organic Tank Waste Safety Programs. The data are discussed in Section 2.0. In addition, the results of analytical support for analyzing (1) simulated wastes for Waste Aging, (2) tank waste samples for Gas Generation, and (3) simulated wastes associated with solubility studies discussed in Sections 3.0, 4.0, and 5.0, respectively. The latter part of FY 1997 was devoted to documenting the analytical procedures, including derivation gas chromatography/mass spectrometry (GC/MS) and GC/FID for quantitation, ion-pair chromatography (IPC), IC, and the cation exchange procedure for reducing the radioactivity of samples. The documentation of analytical procedures is included here and discussed in Section 6.0 and Section 7.0 discusses other analytical procedures. The references are listed in Section 8.0 and future plans are discussed in Section 9.0. Appendix A is a preprint of a manuscript accepted for publication. Appendix B contains the cc mail messages and chain-of-custody forms for the samples received for analyses. Appendix C contains the test plan for analysis of tank waste samples.

  15. Organic analysis progress report FY 1997

    International Nuclear Information System (INIS)

    Clauss, S.A.; Grant, K.E.; Hoopes, V.; Mong, G.M.; Steele, R.; Bellofatto, D.; Sharma, A.

    1998-04-01

    The Organic Analysis and Methods Development Task is being conducted by Pacific Northwest National Laboratory (PNNL) as part of the Organic Tank Waste Safety Project. The objective of the task is to apply developed analytical methods to identify and/or quantify the amount of particular organic species in tank wastes. In addition, this task provides analytical support for the Gas Generation Studies Task, Waste Aging, and Solubility Studies. This report presents the results from analyses of tank waste samples archived at Pacific Northwest National Laboratory (PNNL) and received from the Project Hanford Management Contractor (PHMC), which included samples associated with both the Flammable Gas and Organic Tank Waste Safety Programs. The data are discussed in Section 2.0. In addition, the results of analytical support for analyzing (1) simulated wastes for Waste Aging, (2) tank waste samples for Gas Generation, and (3) simulated wastes associated with solubility studies discussed in Sections 3.0, 4.0, and 5.0, respectively. The latter part of FY 1997 was devoted to documenting the analytical procedures, including derivation gas chromatography/mass spectrometry (GC/MS) and GC/FID for quantitation, ion-pair chromatography (IPC), IC, and the cation exchange procedure for reducing the radioactivity of samples. The documentation of analytical procedures is included here and discussed in Section 6.0 and Section 7.0 discusses other analytical procedures. The references are listed in Section 8.0 and future plans are discussed in Section 9.0. Appendix A is a preprint of a manuscript accepted for publication. Appendix B contains the cc mail messages and chain-of-custody forms for the samples received for analyses. Appendix C contains the test plan for analysis of tank waste samples

  16. Federal Research and Development Funding: FY2011

    Science.gov (United States)

    2011-03-25

    NSF’s offices in 54 Arden L. Bement, Jr., Transformative Research: The Artistry and Alchemy of the 21st... financing for the Technology Innovation Program (TIP) increases 14.3% over FY2010 funding to $79.9 million. The construction budget declines 15.1% to $124.8...Extension Partnership Program received $124.7 million, 13.4% more than FY2009, while financing for TIP increased 7.5% to $69.9 million. Construction

  17. PDX experimental results in FY82

    International Nuclear Information System (INIS)

    Kaye, S.M.; Bell, M.; Bol, K.

    1983-08-01

    This report presents a detailed summary of the major experimental results of PDX in FY82 and represents the efforts of the entire PDX group. Topics covered include β-scaling and fishbone studies, fluctuations, disruptions, impurities and impurity transport, power handling, limiter conditioning, edge studies, plasma fueling, counter-injection, and diagnostic development. A less detailed version will appear as the FY82 PDX contribution to the PPPL Annual Report

  18. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  19. FY 1998 basic survey to promote the joint execution, etc. Overall repair plan of thermal power plants in Maritime Province of Russia; 1998 nendo kyodo jisshi nado suishin kiso chosa. Roshia Enkaishu ni okeru karyoku hatsudensho sogo kaishu keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For thermal power plants in Maritime Province of Russia, a repair plan for effective reduction of emission of greenhouse effect gas was worked out as a draft plan for the joint execution. The project is to be implemented for the additional installation/replacement of boilers at Vladivostok No. 2 power plant, construction of a power plant as a substitute for Partizansk power plant, and new construction of Ussuriisk power plant. The draft plan includes the new installation of two gas-fired boilers/replacement of existing boilers at Vladivostok No. 2 power plant, construction of 200MW cogeneration facility at Partizansk power plant, construction of 180MW cogeneration facility at Ussuriisk power plant, abolition of small-sized boiler station, etc. The reduction amount of the greenhouse effect gas emission based on this repair plan totaled 338 million tons in project. The effect against cost is US$ 4.75 per 1 CO2 ton at Vladivostok. (NEDO)

  20. FY 1999 Report on overseas geological structure surveys. Joint Japan-China Yu Xian exploitation project (Attachments); 1999 nendo kaigai chishitsu kozo nado chosa futai shiryo. Nippon Chugoku sekitan kyodo tansa Yu Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This reports provides the attachments for the report JN0041264. The contents include (1) minutes of the fourth steering committee, (2) technical reports presented to the fourth steering committee (I: report on FY 1998 joint exploitation works, and II: report on FY 1999 joint exploitation works), (3) minutes of the fifth steering committee, and (4) technical reports presented to the fifth steering committee (I: report on FY 1999 joint exploitation works, and II: report on planned FY 2000 joint exploitation works). The item (1) includes approval of the reports on FY 1998 and 1999 joint exploitation works. The item (2)-I report includes seismic exploitation test works, observation work results and quality evaluation thereof; drilling exploitation work results, quality evaluation thereof, exploitation results and evaluation thereof; exploitation results and evaluation thereof; and proposals. The item (2)-II report includes seismic exploitation, drilling exploitation, and man-hours of the workers from the both countries. The item (3) includes approval of the reports on FY 1999 joint exploitation works and planned FY 2000 joint exploitation works. The (4)-I report includes seismic exploitation work results and evaluation thereof, seismic exploitation test works, drilling exploitation work results, quality evaluation thereof, exploitation results and evaluation thereof, and proposals for the future works. The (4)-II report includes seismic and drilling exploitation plans, and numbers and periods of the workers from the both countries. (NEDO)

  1. Decontamination and decommissioning activities photobriefing book FY 1999

    International Nuclear Information System (INIS)

    2000-01-01

    The Chicago Pile 5 (CP-5) Reactor, the first reactor built on the Argonne National Laboratory-East site, followed a rich history that had begun in 1942 with Enrico Fermi's original pile built under the west stands at the Stagg Field Stadium of The University of Chicago. CP-5 was a 5-megawatt, heavy water-moderated, enriched uranium-fueled reactor used to produce neutrons for scientific research from 1954--79. The reactor was shut down and defueled in 1979, and placed into a lay-up condition pending funding for decontamination and decommissioning (D and D). In 1990, work was initiated on the D and D of the facility in order to alleviate safety and environmental concerns associated with the site due to the deterioration of the building and its associated support systems. A decision was made in early Fiscal Year (FY) 1999 to direct focus and resources to the completion of the CP-5 Reactor D and D Project. An award of contract was made in December 1998 to Duke Engineering and Services (Marlborough, MA), and a D and D crew was on site in March 1999 to begin work, The project is scheduled to be completed in July 2000. The Laboratory has determined that the building housing the CP-5 facility is surplus to the Laboratory's needs and will be a candidate for demolition. In addition to a photographic chronology of FY 1999 activities at the CP-5 Reactor D and D Project, brief descriptions of other FY 1999 activities and of projects planned for the future are provided in this photobriefing book

  2. Summaries of FY 1988 research in nuclear physics

    International Nuclear Information System (INIS)

    1989-02-01

    This report summarizes the research projects supported by the Division of Nuclear Physics in the Office of High Energy and Nuclear Physics, during FY 1986. This Division is a component of the Office of Energy Research, the basic research branch of the US Department of Energy, and provides about 80% of the funding for nuclear physics research in the United States. The objective of the Nuclear Physics program is to understand the interactions, properties, and structures of nuclei and nuclear matter and to understand the fundamental forces of nature as manifested in atomic nuclei. These summaries are intended to provide a convenient guide for those interested in the research supported by the Division of Nuclear Physics. The nuclear physics research summaries in this document were initially prepared by the investigators, then reviewed and edited by DOE staff. They describe the general character and goals of the research programs, current research efforts, especially significant recent results, and plans for the near future. The research summaries are organized into two groups: research programs at national laboratories and those at universities, with the material arranged alphabetically by institution. The names of all Ph.D.-level personnel who are primarily associated with the work are included. The FY 1988 funding levels are also provided. Included for the first time are activities of the nuclear data program, which was incorporated within nuclear physics in FY 1987. We remind the readers that this compilation is just an overview of the Nuclear Physics program. Primary publications should be used for reference to the work and for a more complete and accurate understanding

  3. Review of research on simulation engineering in FY2009

    International Nuclear Information System (INIS)

    2011-03-01

    Research on simulation engineering for nuclear applications, based on 'the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes results of the evaluation by the committee on the followings. (1) Research and development on simulation engineering performed at CCSE/JAEA in FY2009. (2) Research and development on simulation engineering performed at CCSE/JAEA in the period of the midterm plan (October 1st, 2005 - March 31st, 2010). (author)

  4. FY2012 CoC Competition Grants (New and Renewal)

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the FY2012 renewal and new homeless assistance projects awarded by HUD for the FY2012 Continuum of Care (CoC) Program competition. Approximately...

  5. EST Table: FY036659 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY036659 rbmte13c09 11/12/09 GO hit GO:0047800(cysteamine dioxygenase activity)|GO:...f|XP_974899.1| PREDICTED: similar to 2-aminoethanethiol (cysteamine) dioxygenase [Tribolium castaneum] FY036659 bmte ...

  6. The America COMPETES Act and the FY2009 Budget

    National Research Council Canada - National Science Library

    Stine, Deborah D

    2008-01-01

    .... An issue for Congress is whether FY2009 appropriations will. The Presidents s Office of Science and Technology Policy reports that the FY2009 budget request includes funding for America COMPETES Act initiatives at 88...

  7. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Science.gov (United States)

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  8. The NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond and Recent Radiation Highlights

    Science.gov (United States)

    LaBel, Kenneth A.; Sampson, Michael J.

    2015-01-01

    This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.

  9. Public perspectives on nuclear security. US national security surveys, 1993--1997

    Energy Technology Data Exchange (ETDEWEB)

    Herron, K.G.; Jenkins-Smith, H.C. [Univ. of New Mexico, Albuquerque, NM (United States). UNM Inst. for Public Policy

    1998-08-01

    This is the third report in a series of studies to examine how US attitudes about nuclear security are evolving in the post-Cold War era and to identify trends in public perceptions and preferences relevant to the evolution of US nuclear security policy. It presents findings from three surveys: a nationwide telephone survey of randomly selected members of the US general public; a written survey of randomly selected members of American Men and Women of Science; and a written survey of randomly selected state legislators from all fifty US states. Key areas of investigation included nuclear security, cooperation between US and Russian scientists about nuclear issues, vulnerabilities of critical US infrastructures and responsibilities for their protection, and broad areas of US national science policy. While international and US national security were seen to be slowly improving, the primary nuclear threat to the US was perceived to have shifted from Russia to China. Support was found for nuclear arms control measures, including mutual reductions in stockpiles. However, respondents were pessimistic about eliminating nuclear armaments, and nuclear deterrence continued to be highly values. Participants favored decreasing funding f/or developing and testing new nuclear weapons, but supported increased investments in nuclear weapons infrastructure. Strong concerns were expressed about nuclear proliferation and the potential for nuclear terrorism. Support was evident for US scientific cooperation with Russia to strengthen security of Russian nuclear assets. Elite and general public perceptions of external and domestic nuclear weapons risks and external and domestic nuclear weapons benefits were statistically significantly related to nuclear weapons policy options and investment preferences. Demographic variables and individual belief systems were systematically related both to risk and benefit perceptions and to policy and spending preferences.

  10. Ignalina Nuclear Power Plant and the Environment. Scientific research program: 1993-1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The aim of the research program is not only to asses the impact of the Ignalina NPP to the ecosystems. There was a need to study the region of Ignalina NPP as a comprehensive nature complex, not limited by the interests or potential of one institution. The implementation of such program could provide scientific conclusions vital for formulating the strategies of nature and health protection under the conditions of normal and emergency operational regimes of Ignalina NPP. The program will be carried out by 250 members of 13 research and academic institutions and will continue from 1993 till 1997. (author). 13 refs., 13 figs.

  11. Radon source apportionment in the home, dosimetry and risk modeling. Final report, 1993-1997

    International Nuclear Information System (INIS)

    Harley, N.H.

    1998-01-01

    This research covered the following 3 topics in 4 years: (1) the source apportionment of 222 Rn in the home; (2) the internal bronchial dosimetry of inhaled 222 Rn decay products; and (3) the lung cancer risk from inhalation of the short lived decay products of 222 Rn. A 4th year of support was appended to this grant with a switch in research effort to determine a method for long term measurement of the particle size distribution of the short lived decay products in homes

  12. Ignalina Nuclear Power Plant and the Environment. Scientific research program: 1993-1997

    International Nuclear Information System (INIS)

    1993-01-01

    The aim of the research program is not only to asses the impact of the Ignalina NPP to the ecosystems. There was a need to study the region of Ignalina NPP as a comprehensive nature complex, not limited by the interests or potential of one institution. The implementation of such program could provide scientific conclusions vital for formulating the strategies of nature and health protection under the conditions of normal and emergency operational regimes of Ignalina NPP. The program will be carried out by 250 members of 13 research and academic institutions and will continue from 1993 till 1997. (author). 13 refs., 13 figs

  13. Desplazamiento, inserción y retorno en Ayacucho (1993-1997) 1

    OpenAIRE

    Cordero, Isabel Coral

    2006-01-01

    El desplazamiento es un fenómeno relativamente nuevo en el Perú. Se trata de un nuevo tipo de migración que tiene como factor determinante la violencia política. A diferencia de la migración tradicional, el desplazamiento se caracteriza por ser forzado, compulsivo, intempestivo y regresivo en tanto reduce sus objetivos a la preservación de un derecho elemental, como es el derecho a la vida. El desplazamiento afectó aproximadamente a 600 mil personas (120 mil familias); algo más del 80% de ést...

  14. Annual report of the Neutron Irradiation and Testing Reactor Center. FY 2008. April 1, 2008 - March 31, 2009

    International Nuclear Information System (INIS)

    2009-12-01

    The JMTR, one of the most high flux test reactors in the world, has been used for the irradiation experiments of fuels and materials related to LWRs, fundamental research and radioisotope productions. The JMTR was stopped at the beginning of August 2006 to conduct refurbishment works, and the reoperation will be planned from FY 2011. After reoperation, the JMTR will contribute to many fields, such as the lifetime extension of LWRs, expansion of industrial use, progress of science and technology. This report summarizes the activities on refurbishment works, development of new irradiation techniques, enhancement of reactor availability, etc. in FY 2008. (author)

  15. FY08 VPP Program Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Dossett, Sharon D.

    2008-01-01

    The Voluntary Protection Program (VPP) is a recognized third-party certification of worker safety and health program excellence, based on industry best practices that focus on management leadership and employee involvement, as well as other safety and health program elements. This Pacific Northwest National Laboratory (PNNL) VPP Program Evaluation is the FY-2008 report of the PNNL VPP Steering Committee regarding the status of VPP at PNNL. It is an update of the previous annual report dated January, 2007 and was completed in January 2008. An annual evaluation of the status of VPP is required of all sites that participate in the DOE-VPP. This report provides a detailed summary of the PNNL VPP Steering Committee’s evaluation of program performance and documents both strengths and improvement opportunities related to the various aspects of the VPP model.

  16. Geosciences projects FY 1985 listing

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    This report, which updates the previous working group publication issued in February 1982, contains independent sections: (A) Summary Outline of DOE Geoscience and Related Studies, and (B) Crosscut of DOE Geoscience and Geoscience Related Studies. The FY 1985 funding levels for geoscience and related activities in each of the 11 programs within DOE are presented. The 11 programs fall under six DOE organizations: Energy Research Conservation and Renewable Energy; Fossil Energy; Defense Programs; Environmental, Safety, and Health; and Civilian radioactive Waste. From time to time, there is particular need for special interprogrammatic coordination within certain topical areas. section B of the report is intended to fill this need for a topical categorization of the Department's geoscience and related activities. These topical areas in Solid Earth Geosciences, Atmospheric Geosciences, Ocean Geosciences, Space and Solar/Terrestrial Geosciences, and Hydrological Geosciences are presented in this report.

  17. Using Organizational Philosophy to Create a Self-Sustaining Compensation Plan Without Harming Academic Missions.

    Science.gov (United States)

    Leverence, Robert; Nuttall, Richard; Palmer, Rachel; Segal, Mark; Wood, Alicia; Yancey, Fay; Shuster, Jonathon; Brantly, Mark; Hromas, Robert

    2017-08-01

    Academic physician reimbursement has moved to productivity-based compensation plans. To be sustainable, such plans must be self-funding. Additionally, unless research and education are appropriately valued, faculty involved in these efforts will become disillusioned, yet revenue generation in these activities is less robust than for clinical care activities. Faculty at the Department of Medicine, University of Florida Health, elected a committee of junior and senior faculty and division chiefs to restructure the compensation plan in fiscal year (FY) 2011. This committee was charged with designing a new compensation plan based on seven principles of organizational philosophy: equity, compensation coupled to productivity, authority aligned with responsibility, respect for all academic missions, transparency, professionalism, and self-funding in each academic mission. The new compensation plan was implemented in FY2013. A survey administered at the end of FY2015 showed that 61% (76/125) of faculty were more satisfied with this plan than the previous plan. Since the year before implementation, clinical relative value units per faculty increased 7% (from 3,458 in FY2012 to 3,704 in FY2015, P < .002), incentives paid per faculty increased 250% (from $3,191 in FY2012 to $11,153 in FY2015, P ≤ .001), and publications per faculty increased 15% (from 2.6 in FY2012 to 3.0 in FY2015, P < .001). Grant submissions, external funding, and teaching hours also increased per faculty but did not reach statistical significance. An important next step will be to incorporate quality metrics into the compensation plan, without affecting costs or throughput.

  18. Alternative Electrochemical Salt Waste Forms, Summary of FY2010 Results

    International Nuclear Information System (INIS)

    Riley, Brian J.; Rieck, Bennett T.; Crum, Jarrod V.; Matyas, Josef; McCloy, John S.; Sundaram, S.K.; Vienna, John D.

    2010-01-01

    In FY2009, PNNL performed scoping studies to qualify two waste form candidates, tellurite (TeO2-based) glasses and halide minerals, for the electrochemical waste stream for further investigation. Both candidates showed promise with acceptable PCT release rates and effective incorporation of the 10% fission product waste stream. Both candidates received reprisal for FY2010 and were further investigated. At the beginning of FY2010, an in-depth literature review kicked off the tellurite glasses study. The review was aimed at ascertaining the state-of-the-art for chemical durability testing and mixed chloride incorporation for tellurite glasses. The literature review led the authors to 4 unique binary and 1 unique ternary systems for further investigation which include TeO2 plus the following: PbO, Al2O3-B2O3, WO3, P2O5, and ZnO. Each system was studied with and without a mixed chloride simulated electrochemical waste stream and the literature review provided the starting points for the baseline compositions as well as starting points for melting temperature, compatible crucible types, etc. The most promising glasses in each system were scaled up in production and were analyzed with the Product Consistency Test, a chemical durability test. Baseline and PCT glasses were analyzed to determine their state, i.e., amorphous, crystalline, phase separated, had undissolved material within the bulk, etc. Conclusions were made as well as the proposed direction for FY2011 plans. Sodalite was successfully synthesized by the sol-gel method. The vast majority of the dried sol-gel consisted of sodalite with small amounts of alumino-silicates and unreacted salt. Upon firing the powders made by sol-gel, the primary phase observed was sodalite with the addition of varying amounts of nepheline, carnegieite, lithium silicate, and lanthanide oxide. The amount of sodalite, nepheline, and carnegieite as well as the bulk density of the fired pellets varied with firing temperature, sol

  19. Alternative Electrochemical Salt Waste Forms, Summary of FY2010 Results

    Energy Technology Data Exchange (ETDEWEB)

    Riley, Brian J.; Rieck, Bennett T.; Crum, Jarrod V.; Matyas, Josef; McCloy, John S.; Sundaram, S. K.; Vienna, John D.

    2010-08-01

    In FY2009, PNNL performed scoping studies to qualify two waste form candidates, tellurite (TeO2-based) glasses and halide minerals, for the electrochemical waste stream for further investigation. Both candidates showed promise with acceptable PCT release rates and effective incorporation of the 10% fission product waste stream. Both candidates received reprisal for FY2010 and were further investigated. At the beginning of FY2010, an in-depth literature review kicked off the tellurite glasses study. The review was aimed at ascertaining the state-of-the-art for chemical durability testing and mixed chloride incorporation for tellurite glasses. The literature review led the authors to 4 unique binary and 1 unique ternary systems for further investigation which include TeO2 plus the following: PbO, Al2O3-B2O3, WO3, P2O5, and ZnO. Each system was studied with and without a mixed chloride simulated electrochemical waste stream and the literature review provided the starting points for the baseline compositions as well as starting points for melting temperature, compatible crucible types, etc. The most promising glasses in each system were scaled up in production and were analyzed with the Product Consistency Test, a chemical durability test. Baseline and PCT glasses were analyzed to determine their state, i.e., amorphous, crystalline, phase separated, had undissolved material within the bulk, etc. Conclusions were made as well as the proposed direction for FY2011 plans. Sodalite was successfully synthesized by the sol-gel method. The vast majority of the dried sol-gel consisted of sodalite with small amounts of alumino-silicates and unreacted salt. Upon firing the powders made by sol-gel, the primary phase observed was sodalite with the addition of varying amounts of nepheline, carnegieite, lithium silicate, and lanthanide oxide. The amount of sodalite, nepheline, and carnegieite as well as the bulk density of the fired pellets varied with firing temperature, sol

  20. FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief

    Science.gov (United States)

    2016-11-07

    generally applicable rate in Section 101: “Notwithstanding section 101, amounts are provided for ‘Defense Nuclear Facilities Safety Board— Salaries...acquisition community must consider late enactment to be the norm [emphasis in original] rather than the exception and, therefore, plan their...would be capped at 12, instead of the requested 15. If held to the lower FY2016 production rates through January 2017, the Air Force could face a

  1. Optimizing Federal Fleet Vehicle Acquisitions: An Eleven-Agency FY 2012 Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Singer, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Daley, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-02-01

    This report focuses on the National Renewable Energy Laboratory's (NREL) fiscal year (FY) 2012 effort that used the NREL Optimal Vehicle Acquisition (NOVA) analysis to identify optimal vehicle acquisition recommendations for eleven diverse federal agencies. Results of the study show that by following a vehicle acquisition plan that maximizes the reduction in greenhouse gas (GHG) emissions, significant progress is also made toward the mandated complementary goals of acquiring alternative fuel vehicles, petroleum use reduction, and alternative fuel use increase.

  2. Laboratory directed research and development FY98 annual report; TOPICAL

    International Nuclear Information System (INIS)

    Al-Ayat, R; Holzrichter, J

    1999-01-01

    In 1984, Congress and the Department of Energy (DOE) established the Laboratory Directed Research and Development (LDRD) Program to enable the director of a national laboratory to foster and expedite innovative research and development (R and D) in mission areas. The Lawrence Livermore National Laboratory (LLNL) continually examines these mission areas through strategic planning and shapes the LDRD Program to meet its long-term vision. The goal of the LDRD Program is to spur development of new scientific and technical capabilities that enable LLNL to respond to the challenges within its evolving mission areas. In addition, the LDRD Program provides LLNL with the flexibility to nurture and enrich essential scientific and technical competencies and enables the Laboratory to attract the most qualified scientists and engineers. The FY98 LDRD portfolio described in this annual report has been carefully structured to continue the tradition of vigorously supporting DOE and LLNL strategic vision and evolving mission areas. The projects selected for LDRD funding undergo stringent review and selection processes, which emphasize strategic relevance and require technical peer reviews of proposals by external and internal experts. These FY98 projects emphasize the Laboratory's national security needs: stewardship of the U.S. nuclear weapons stockpile, responsibility for the counter- and nonproliferation of weapons of mass destruction, development of high-performance computing, and support of DOE environmental research and waste management programs

  3. PART I: Bioventing Pilot Test Work Plan for Fire Protection Training Area Site FY-03, Charleston AFB, South Carolina. PART II: Draft Interim Pilot Test Results Report for Fire Protection Training Area Site FT-03, Charleston AFB, South Carolina

    National Research Council Canada - National Science Library

    1993-01-01

    This site-specific work plan presents the scope of a bioventing pilot test for in situ treatment of fuel contaminated soils at the Fire Protection Training Area designated as Site FT-O3, Charleston Air Force Base (AFB), South Carolina...

  4. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  5. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    International Nuclear Information System (INIS)

    Appel, Gordon John

    2016-01-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  6. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  7. Strategic planning applied to quality in asthma management for children.

    Science.gov (United States)

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  8. Theoretical Division annual report, FY 1975

    International Nuclear Information System (INIS)

    Carruthers, P.A.

    1976-02-01

    This report presents an overview of the activities in the Theoretical Division and a summary of research highlights during FY 1975. It is intended to inform a wide audience about the theoretical work of the LASL and, therefore, contains introductory material which places recent advances in a broader context. The report is organized into two special interest reports: reactor safety research and the Advanced Research Committee, and 11 reports from the T-Division group leaders on the work of their respective groups. Main interests and responsibilities are outlined including the relationship of the group's work to the work of other T-Division groups and other divisions at the Laboratory. The description of research highlights for FY 1975 explains in a fairly simple, straightforward manner the major recent advances and their significance. Each group report is followed by a publication list for FY 1975 (330 references) and a list of talks given outside the Laboratory (140 references). 29 figures

  9. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  10. National Aeronautics and Space Administration FY 2001 Accountability Report

    Science.gov (United States)

    2001-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this Report.

  11. Fusion Reactor Safety Research Program annual report, FY-79

    International Nuclear Information System (INIS)

    Crocker, J.G.; Cohen, S.

    1980-08-01

    The objective of the program is the development, coordination, and execution of activities related to magnetic fusion devices and reactors that will: (a) identify and evaluate potential hazards, (b) assess and disclose potential environmental impacts, and (c) develop design standards and criteria that eliminate, mitigate, or reduce those hazards and impacts. The program will provide a sound basis for licensing fusion reactors. Included in this report are portions of four reports from two outside contractors, discussions of the several areas in which EG and G Idaho is conducting research activities, a discussion of proposed program plan development, mention of special tasks, a review of fusion technology program coordination by EG and G with other laboratories, and a brief view of proposed FY-80 activities

  12. KEK Engineering Department -activity report FY 2003

    International Nuclear Information System (INIS)

    2005-03-01

    This report includes all kinds of activities of the Engineering Department of KEK from 2002 to 2003 FY. There are fourteen chapters, which contain KEK Prize for engineering, KEK meeting of engineering technologies, Engineering Seminar, COACK (Component Oriented Advanced Control Kernel) for cooperation R and D project, Forum on engineering technologies from 1998 to 2003 FY, Engineering Department Symposium, service trainings, Engineering Department research study, English training, training for professional worker, training for technical expert, report on joint training for technical expert, training for middle school students, and the Engineering Department system and the main events from 1971 to 2003. (S.Y. )

  13. NREL Partnership Survey - FY 2016 Results

    Energy Technology Data Exchange (ETDEWEB)

    2016-09-01

    The National Renewable Energy Laboratory (NREL) conducts an annual partnership satisfaction survey in which we ask our clients to rate NREL in a number of areas. As a national laboratory, the principal areas we focus on include value, timeliness, quality, price, and capabilities. This fact sheet shows the results of a survey with 300 customers responding to 11 questions using ratings that vary from 'strongly agree' to 'strongly disagree.' In FY 16, 100% of the scores improved or were equal to FY 15 numbers.

  14. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  15. FY2000 Hanford Technology Deployment Accomplishments Fact Sheets

    International Nuclear Information System (INIS)

    WIBLE, R.A.

    2001-01-01

    Cleaning up the Hanford Site is one of the top priorities for the U. S. Department of Energy. The department is continually looking for ways to expedite cleanup and reduce costs. During Fiscal Year (FY) 2000. Hanford Site staff deployed 24 new technologies, which produced an estimated lifecycle cost savings of 479 million dollars. This is a clear indicator of the impacts new technology has had and will have on the cleanup efforts. The Hanford Site cleanup is focused on the following: Restoring the Columbia River Corridor; Building and operating the tank waste treatment complex to complete the cleanup of highly radioactive tank waste at Hanford; and Transitioning the Central Plateau. Applying innovative science and technology from national laboratories, universities, and private industry is critical to our complex cleanup mission. The 24 new technologies deployed in FY 2000 are significantly higher than our goal of 14 technological deployments. Eleven of these technologies supported restoring the Columbia River Corridor, and seven were involved with the remediation of radioactive tank waste. These deployments produced valuable information to determine the effectiveness of the new technologies in the field and the efficiencies gained over existing cleanup methods. In several cases, the technology deployed presented a solution to a problem where a clear path of remediation had not yet been determined. New and innovative technologies will play a significant role in the cleanup of the Hanford Site and enable remediation to be done more efficiently. Technology is being developed at a staggering pace. This requires excellent communication throughout the scientific and industry arenas. To effect this communication, we have implemented a technology needs process in conjunction with the multi-year work planning process. Through the combination of these two processes, technology developments and deployments address the near-term technology needs and enable us to plan for the

  16. Radon Research Program, FY 1991

    International Nuclear Information System (INIS)

    1992-03-01

    The scientific information being sought in this program encompasses research designed to determine radon availability and transport outdoors, modeling transport into and within buildings, physics and chemistry of radon and radon progeny, dose response relationships, lung cancer risk, and mechanisms of radon carcinogenesis. The main goal of the DOE/OHER Radon Research Program is to develop information to reduce these uncertainties and thereby provide an improved health risk estimate of exposure to radon and its progeny as well as to provide information useful in radon control strategies. Results generated under the Program were highlighted in a National Research Council report on radon dosimetry. The study concluded that the risk of radon exposure is 30% less in homes than in mines. This program summary of book describes the OHER FY-1991 Radon Research Program. It is the fifth in an annual series of program books designed to provide scientific and research information to the public and to other government agencies on the DOE Radon Research Program

  17. Radon Research Program, FY-1990

    International Nuclear Information System (INIS)

    1991-03-01

    The Department of Energy (DOE) Office of Health and Environmental Research (OHER) has established a Radon Research Program with the primary objectives of acquiring knowledge necessary to improve estimates of health risks associated with radon exposure and also to improve radon control. Through the Radon Research Program, OHER supports and coordinates the research activities of investigators at facilities all across the nation. From this research, significant advances are being made in our understanding of the health effects of radon. OHER publishes this annual report to provide information to interested researchers and the public about its research activities. This edition of the report summarizes the activities of program researchers during FY90. Chapter 2 of this report describes how risks associated with radon exposure are estimated, what assumptions are made in estimating radon risks for the general public, and how the uncertainties in these assumptions affect the risk estimates. Chapter 3 examines how OHER, through the Radon Research Program, is working to gather information for reducing the uncertainties and improving the risk estimates. Chapter 4 highlights some of the major findings of investigators participating in the Radon Research Program in the past year. And, finally, Chapter 5 discusses the direction in which the program is headed in the future. 20 figs

  18. Waste Minimization and Pollution Prevention Awareness Plan

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, to estimate budget, and to review the plan. In addition to the above, this plan records LLNL's goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities

  19. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  20. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs. FY 2005 - FY 2050

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-05-01

    This report describes a benefits analysis undertaken by EERE to better understand the extent to which the technologies and market improvements funded by its FY 2005 budget request will make energy more affordable, cleaner, and more reliable. It summarizes the results of the analysis, which focused on economic, environmental, and security benefits related to energy. The report identifies specific measures or indicators of estimated benefits for FY 2005.

  1. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    Energy Technology Data Exchange (ETDEWEB)

    Riley, Brian J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mccloy, John S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Crum, Jarrod V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lepry, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rodriguez, Carmen P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Windisch, Charles F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Matyas, Josef [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westman, Matthew P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rieck, Bennett T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lang, Jesse B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Olszta, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pierce, David A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-17

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for the Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.

  2. FY2000 Annual Self-Evaluation Report for the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    RR Labarge

    2000-11-15

    This self-evaluation report offers a summary of results from FY2000 actions to achieve Pacific Northwest National Laboratory's strategy and provides an analysis of the state of their self-assessment process. The result of their integrated planning and assessment process identifies Laboratory strengths and opportunities for improvement. Critical elements of that process are included in this report; namely, a high-level summary of external oversight activities, progress against Operations Improvement Initiatives, and a summary of Laboratory strengths and areas for improvement developed by management from across the laboratory. Some key areas targeted for improvement in FY2001 are: systems approach to resource management; information protection; integrated safety management flow-down to the benchtop; cost management; integrated assessment; Price Anderson Amendments Act (PAAA) Program; and travel risk mitigation.

  3. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Farren [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  4. CEMENTITIOUS BARRIERS PARTNERSHIP FY13 MID-YEAR REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Burns, H.; Flach, G.; Langton, C.; KOSSON, D.; BROWN, K.; SAMSON, E.; MEEUSSEN, J.; SLOOT, H.; GARBOCZI, E.

    2013-05-01

    In FY2013, the Cementitious Barriers Partnership (CBP) is continuing in its effort to develop and enhance software tools demonstrating tangible progress toward fulfilling the objective of developing a set of tools to improve understanding and prediction of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In FY2012, the CBP released the initial inhouse “Beta-version” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. The current primary software components are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. THAMES is a planned future CBP Toolbox component (FY13/14) focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. This past November, the CBP Software Toolbox Version 1.0 was released that supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). The CBP issued numerous reports and other documentation that accompanied the “Version 1.0” release including a CBP Software Toolbox User Guide and Installation Guide. These documents, as well as, the

  5. Technical Issues Map for the NHI System Interface and Support Systems Area: 3rd Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool by the NHI technical leadership for future work package planning. The technical map in its present form will be discontinued in FY08 and will be folded into a larger NHI System Interface and Support Systems project management plan and scope baseline statement in FY08

  6. Exploratory Research and Development Fund, FY 1990. Report on Lawrence Berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R&D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R&D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics.

  7. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  8. FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Templeton, K.J.

    1996-05-23

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year to maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on

  9. FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2

    International Nuclear Information System (INIS)

    Templeton, K.J.

    1996-01-01

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company's Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year to maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division's treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on

  10. Cloud computing strategic framework (FY13 - FY15).

    Energy Technology Data Exchange (ETDEWEB)

    Arellano, Lawrence R.; Arroyo, Steven C.; Giese, Gerald J.; Cox, Philip M.; Rogers, G. Kelly

    2012-11-01

    This document presents an architectural framework (plan) and roadmap for the implementation of a robust Cloud Computing capability at Sandia National Laboratories. It is intended to be a living document and serve as the basis for detailed implementation plans, project proposals and strategic investment requests.

  11. FY 1999 report on the results of the development of high efficiency lightning conversion compound semiconductor. Plan on lighting for the 21st century; Kokoritsu denko henkan kagobutsu handotai kaihatsu seika hokokusho. 21 seiki no akari keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of developing the white light-emitting diode (LEDs) lightening as 'a plan on lighting for the 21st century,' the results of the following R and D were obtained: 1) basic study of light-emitting mechanism; 2) improvement of epitaxial growth method of blue/ultraviolet LED; 3) substrate for homoepitaxial growth; 4) basic characteristics of phosphor-based light source for white LED lighting. In 1), light emitting mechanisms responsible for high-quantum efficiency of InGaN mixed semiconductors and InGaN/GaN quantum wells were studied by means of temperature-dependent photoluminescence (PL), time-resolved PL and selective-excitation PL spectroscopy. In 2), precise lapping and polishing procedures of sapphire and GaN crystalline substrates for epitaxial growth using metalorganic chemical-vapor-deposition and MBE showed favorable surface characteristics of substrates. In 3), study was made on growth conditions and growth mechanism of GaN bulk single crystals using the nitrogen pressure-controlled solution growth method. A size of 12mm diameter of GaN single crystal showing good crystallinity and PL characteristics were obtained. In 4), excitation, absorption and PL spectra of rare-earth doped Y{sub 2}O{sub 2}S red phosphor were studied in detail. (NEDO)

  12. FY 1998 basic survey to promote the joint execution, etc. Plan for repair of Schekinskaya thermal power plant; 1998 nendo kyodo jisshi nado suishin kiso chosa. Schekinskaya karyoku hatsudensho kaishu keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project is a feasibility study to get effects of reducing greenhouse effect gas by repairing Units 8, 9, and 10 (330MW in total) of Schekinskaya thermal power plant and Units 1-7 (450MW in total) of Novomoskovskaya thermal power plant. Both are very old brown coal fired thermal power plants which were constructed during 1947-1967. At present, they are run fired by natural gas. Being very superannuated, they need repair of the facilities. In the adjustment of opinions with Russia, the plan was aimed at substantial reduction of greenhouse effect gas by increasing thermal efficiency of power plant. For it, a 800MW class gas turbine combined cycle power plant is constructed at Novomoskovskaya power plant where there are existing buildings and space for equipment and where gas fuel can be used. As a result of the study, it was indicated that the reduction amount of greenhouse effect gas after the repair becomes 1,853,966 tons/yr as against 3,590,514 tons/yr before the repair. (NEDO)

  13. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)

  14. Federal Research and Development Funding: FY2013

    Science.gov (United States)

    2013-12-05

    NIA ) 1,120 1,103 1,102 1,124 1,040 Arthritis/Musculoskeletal/Skin (NIAMS) 535 536 535 537 505 Deafness/Communication Disorders (NIDCD) 416 417...Secretary’s net transfer of $18.273 million for Alzheimer’s disease research to National Institute on Aging ( NIA ) from other ICs. FY2012 figures are shown on

  15. SERI Biomass Program. FY 1983 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Corder, R.E.; Hill, A.M.; Lindsey, H.; Lowenstein, M.Z.; McIntosh, R.P.

    1984-02-01

    This report summarizes the progress and research accomplishments of the SERI Biomass Program during FY 1983. The SERI Biomass Program consists of three elements: Aquatic Species, Anaerobic Digestion, and Photo/Biological Hydrogen. Each element has been indexed separately. 2 references, 44 figures, 22 tables.

  16. Transmutation Fuels Campaign FY-09 Accomplishments Report

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase

    2009-09-01

    This report summarizes the fiscal year 2009 (FY-08) accomplishments for the Transmutation Fuels Campaign (TFC). The emphasis is on the accomplishments and relevance of the work. Detailed description of the methods used to achieve the highlighted results and the associated support tasks are not included in this report.

  17. Advanced Energy Projects: FY 1993, Research summaries

    International Nuclear Information System (INIS)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included

  18. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  19. Feedstock Interface Fy2017 Q3 Report

    Energy Technology Data Exchange (ETDEWEB)

    Carpenter, Danny [National Renewable Energy Lab. (NREL), Golden, CO (United States); Howe, Daniel [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westover, Tyler [Idaho National Lab. (INL), Idaho Falls, ID (United States); Klinger, HJordan [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hernandez, Sergio [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-07-10

    This report summarized the results obtained in FY2017 Q3 of a collaborative effort between researchers at NREL, PNNL, and INL to develop rapid screening methods and models to predict the fact pyrolysis conversion performance of a range of biomass materials.

  20. Institutional research and development, FY 1987

    Energy Technology Data Exchange (ETDEWEB)

    Struble, G.L.; Lawler, G.M.; Crawford, R.B.; Kirvel, R.D.; Peck, T.M.; Prono, J.K.; Strack, B.S. (eds.)

    1987-01-01

    The Institutional Research and Development program at Lawrence Livermore National Laboratory fosters exploratory work to advance science and technology, disciplinary research to develop innovative solutions to problems in various scientific fields, and long-term interdisciplinary research in support of defense and energy missions. This annual report describes research funded under this program for FY87. (DWL)

  1. Institutional research and development, FY 1987

    International Nuclear Information System (INIS)

    Struble, G.L.; Lawler, G.M.; Crawford, R.B.; Kirvel, R.D.; Peck, T.M.; Prono, J.K.; Strack, B.S.

    1987-01-01

    The Institutional Research and Development program at Lawrence Livermore National Laboratory fosters exploratory work to advance science and technology, disciplinary research to develop innovative solutions to problems in various scientific fields, and long-term interdisciplinary research in support of defense and energy missions. This annual report describes research funded under this program for FY87

  2. Advanced Energy Projects: FY 1993, Research summaries

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included.

  3. FY 2012 Lightweight Materials Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-04-15

    The FY 2012 Annual Progress Report for Lightweight Materials provides a detailed description of the activities and technical accomplishments which focuses on the development and validation of advanced materials and manufacturing technologies to significantly reduce light and heavy duty vehicle weight without compromising other attributes such as safety, performance, recyclability, and cost.

  4. Tanks Focus Area (TFA) FY1999 Midyear Review Report

    International Nuclear Information System (INIS)

    Schlahta, Stephan N.

    1999-01-01

    The purpose of the Tanks Focus Area (TFA) Midyear Review was to improve the quality and responsiveness of TFA technical solutions to identified user needs. This review goal was achieved through executing a multi-phased review approach. The first phase of the midyear review focused on the subset of FY99 work identified by Department of energy users as having continuing benefit in FY00-01. The TFA FY00-02 Technical Responses identified FY99 work that had continued applicability based on the most current set of site user needs. Each TFA FY00-02 Technical Response which included FY work scope was reviewed by the TFA Technical Advisory Group (TAG), in a meeting held in February 1999. Made up of technical experts from across the country, the TAG provides high-quality, short-turnaround, independent technical reviews for the TFA

  5. DOE FY 2010 Budget Request and Recovery Act Funding for Energy Research, Development, Demonstration, and Deployment: Analysis and Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Anadon, Laura Diaz; Gallagher, Kelly Sims; Bunn, Matthew

    2009-06-01

    short-term. Energy storage may play a crucial role in the future of the power and transportation systems, which together consume two thirds of primary energy in the United States. A recent National Academy of Science report recommended carrying out detailed scenario assessments of the penetration of unconventional fuels from coal and coal and biomass with CCS. And the research plan provided for nuclear fission does not justify spending as many funds as were requested. The proposed funding for FY 2010 and the resources from ARRA, however, do not guarantee that the United States will finally enjoy the predictable and consistent publicly-funded energy technology innovation effort that it needs. The Obama administration must put in place a comprehensive energy technology innovation strategy that will ensure that an expanded ERD3 effort is both sustainable and efficient. This commission would be charged with, inter alia, developing a strategy that optimizes the integration of the various stages of innovation (research, development, demonstration, early deployment), as well as integrates efforts across technology areas. The database upon which this analysis is based may be downloaded in Excel format at: http://belfercenter.ksg.harvard.edu/publication/19119/ .

  6. Integrated Disposal Facility FY2010 Glass Testing Summary Report

    International Nuclear Information System (INIS)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Serne, R. Jeffrey; Mattigod, Shas V.

    2010-01-01

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 A - 105 m 3 of glass (Puigh 1999). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 0.89 A - 1018 Bq total activity) of long-lived radionuclides, principally 99Tc (t1/2 = 2.1 A - 105), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessement (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2010 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses. The emphasis in FY2010 was the completing an evaluation of the most sensitive kinetic rate law parameters used to predict glass weathering, documented in Bacon and Pierce (2010), and transitioning from the use of the Subsurface Transport Over Reactive Multi-phases to Subsurface Transport Over Multiple Phases computer code for near-field calculations. The FY2010 activities also consisted of developing a Monte Carlo and Geochemical Modeling framework that links glass composition to alteration phase formation by (1) determining the structure of unreacted and reacted glasses for use as input information into Monte Carlo

  7. Integrated Disposal Facility FY2010 Glass Testing Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Serne, R Jeffrey; Mattigod, Shas V.

    2010-09-30

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 × 105 m3 of glass (Puigh 1999). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 0.89 × 1018 Bq total activity) of long-lived radionuclides, principally 99Tc (t1/2 = 2.1 × 105), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessement (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2010 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses. The emphasis in FY2010 was the completing an evaluation of the most sensitive kinetic rate law parameters used to predict glass weathering, documented in Bacon and Pierce (2010), and transitioning from the use of the Subsurface Transport Over Reactive Multi-phases to Subsurface Transport Over Multiple Phases computer code for near-field calculations. The FY2010 activities also consisted of developing a Monte Carlo and Geochemical Modeling framework that links glass composition to alteration phase formation by 1) determining the structure of unreacted and reacted glasses for use as input information into Monte Carlo

  8. NREL Energy Storage Projects: FY2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  9. Integrated Data Collection Analysis (IDCA) Program: FY2011 Project Descriptions

    Energy Technology Data Exchange (ETDEWEB)

    Sandstrom, Mary M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Geoffrey W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Warner, Kirstin F. [Naval Surface Warfare Center (NSWC-IHD), Indian Head, MD (United States). Indian Head Division; Remmers, Daniel L. [Naval Surface Warfare Center (NSWC-IHD), Indian Head, MD (United States). Indian Head Division; Whinnery, LeRoy L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shelley, Timothy J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Reyes, Jose A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hsu, Peter C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Reynolds, John G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2012-02-03

    This document provides brief descriptions of research topics for consideration by the IDCA for potential funding in funding in FY 2011. The topics include the utilization of the results from the Proficiency Test developed during FY 2010 to start populating the small-scale safety and thermal testing (SSST) Testing Compendium and revising results from methods modifications. Other research topics were also developed for FY 2011 from issues that arose in the Proficiency Test.

  10. 76 FR 5431 - Publication of FY 2010 Service Contract Inventory

    Science.gov (United States)

    2011-01-31

    ... DEPARTMENT OF THE TREASURY Publication of FY 2010 Service Contract Inventory AGENCY: Departmental Offices, Treasury. ACTION: Notice of publication of Fiscal Year 2010 Service Contract Inventory. [[Page 5432

  11. Technical plan for nondestructive examination technology development

    International Nuclear Information System (INIS)

    Anderson, B.C.

    1982-12-01

    This report provides a description of the development of the nondestructive examination (NDE) equipment to be used in the Stored Waste Examination Pilot Plant (SWEPP) for certifying transuranic (TRU) waste for shipment to the Waste Isolation Pilot Plant (WIPP). NDE equipment is being developed for waste identification and container integrity. Real-time x-ray radiography is the basic method being used for waste identification. Acoustic (ultrasonic) testing is being used to obtain measurements to verify container integrity. This report describes the decisions made to date, the decisions to be made, and the activities planned for FY 1983 through FY 1985

  12. Advanced Simulation and Computing FY10-FY11 Implementation Plan Volume 2, Rev. 0.5

    Energy Technology Data Exchange (ETDEWEB)

    Meisner, R; Peery, J; McCoy, M; Hopson, J

    2009-09-08

    The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering (D&E) programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: (1) Robust Tools - Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements; (2) Prediction through Simulation - Deliver validated physics and engineering tools to enable simulations of nuclear weapons performance in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile; and (3) Balanced Operational Infrastructure - Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

  13. Advanced Simulation and Computing FY09-FY10 Implementation Plan Volume 2, Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    Kissel, L

    2009-04-01

    The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: (1) Robust Tools - Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements; (2) Prediction through Simulation - Deliver validated physics and engineering tools to enable simulations of nuclear weapons performance in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile; and (3) Balanced Operational Infrastructure - Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

  14. Advanced Simulation and Computing FY09-FY10 Implementation Plan, Volume 2, Revision 0.5

    Energy Technology Data Exchange (ETDEWEB)

    Meisner, R; Hopson, J; Peery, J; McCoy, M

    2008-10-07

    The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC)1 is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: Objective 1. Robust Tools--Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements. Objective 2. Prediction through Simulation--Deliver validated physics and engineering tools to enable simulations of nuclear weapons performance in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile. Objective 3. Balanced Operational Infrastructure--Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

  15. Instrumentation and Controls Division, Technical Support Department Management Plan, FY 1993--FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Kunselman, C.W.; Effler, R.P.; Miller, D.R.; Millet, A.J.; Stansberry, C.T.

    1993-08-01

    This report describes the organization, key functions, and major activities of the Technical Support Department The Department is the programmatic support element of the Instrumentation and Controls Division. The Department`s primary focus is the support of existing equipment and systems at Oak Ridge National Laboratory that are generally characterized as instrumentation and controls. The support takes the form of repair, calibration, fabrication, field engineering, preventive maintenance, software support, and record keeping.

  16. Oak Ridge National Laboratory Institutional Plan for FY 1999 Through FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    Trivelpiece, A.W.

    1998-01-01

    In January 1996, when the management and operation (M and O) contract for the Oak Ridge National Laboratory (ORNL) was awarded to Lockheed Martin Energy Research Corporation, they were presented with the opportunity to develop and implement a management structure tailored to the Laboratory's needs and functions. In response, they launched a Laboratory-wide reengineering effort and undertook other work with the goal of fostering excellence, relevance, and stewardship in all aspects of the Laboratory's operations. This effort is paying off in improvements in their ability to meet the expectations established for ORNL as a Department of Energy laboratory overseen by the Office of Science: delivering advances in science and technology, securing new capabilities, improving the ability to operate safely and efficiently at reasonable cost, and being a good neighbor. The development of critical outcomes and objectives, now under way in partnership with the Department's Oak Ridge Operations Office, is aimed at providing a performance-based means of determining how ORNL measures up to these expectations.

  17. TFA Tank Focus Area - multiyear program plan FY98-FY00

    International Nuclear Information System (INIS)

    1997-09-01

    The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation problem with hundreds of waste tanks containing hundreds of thousands of cubic meters of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Approximately 80 tanks are known or assumed to have leaked. Some of the tank contents have reacted to form flammable gases, introducing additional safety risks. These tanks must be maintained in a safe condition and eventually remediated to minimize the risk of waste migration and/or exposure to workers, the public, and the environment. However, programmatic drivers are more ambitious than baseline technologies and budgets will support. Science and technology development investments are required to reduce the technical and programmatic risks associated with the tank remediation baselines. The Tanks Focus Area (TFA) was initiated in 1994 to serve as the DOE's Office of Environmental Management's (EM's) national technology development program for radioactive waste tank remediation. The national program was formed to increase integration and realize greater benefits from DOE's technology development budget. The TFA is responsible for managing, coordinating, and leveraging technology development to support DOE's four major tank sites: Hanford Site (Washington), Idaho National Engineering and Environmental Laboratory (INEEL) (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank with safety integrated into all the functions. The TFA integrates program activities across organizations that fund tank technology development EM, including the Offices of Waste Management (EM-30), Environmental Restoration (EM-40), and Science and Technology (EM-50)

  18. FY 2012 INL SITE SUSTAINABILITY PLAN WITH THE FY 2011 ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Ernest L. Fossum; Steve A. Birrer

    2012-01-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  19. TFA Tanks Focus Area Multiyear Program Plan FY00-FY04

    International Nuclear Information System (INIS)

    BA Carteret; JH Westsik; LR Roeder-Smith; RL Gilchrist; RW Allen; SN Schlahta; TM Brouns

    1999-01-01

    The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation problem with hundreds of waste tanks containing hundreds of thousands of cubic meters of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Approximately 68 tanks are known or assumed to have leaked contamination to the soil. Some of the tank contents have reacted to form flammable gases, introducing additional safety risks. These tanks must be maintained in a safe condition and eventually remediated to minimize the risk of waste migration and/or exposure to workers, the public, and the environment. However, programmatic drivers are more ambitious than baseline technologies and budgets will support. Science and technology development investments are required to reduce the technical and programmatic risks associated with the tank remediation baselines. The Tanks Focus Area (TFA) was initiated in 1994 to serve as the DOE Office of Environmental Management's (EM's) national technology development program. for radioactive waste tank remediation. The national program was formed to increase integration and realize greater benefits from DOE's technology development budget. The TFA is responsible for managing, coordinating, and leveraging technology development to support DOE's five major tank sites: Hanford Site (Washington), Idaho National Engineering and Environmental Laboratory (INEEL) (Idaho), Oak Ridge Reservation (ORR) (Tennessee), Savannah River Site (SRS) (South Carolina), and West Valley Demonstration Project (WVDP) (New York). Its technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank with safety integrated into all the functions. The TFA integrates program activities across EM organizations that fund tank technology development, including the Offices of Waste Management (EM-30), Environmental Restoration (EM-40), and Science and Technology (EM-50 or OST)

  20. TFA Tanks Focus Area Multiyear Program Plan FY00-FY04

    Energy Technology Data Exchange (ETDEWEB)

    BA Carteret; JH Westsik; LR Roeder-Smith; RL Gilchrist; RW Allen; SN Schlahta; TM Brouns

    1999-10-12

    The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation problem with hundreds of waste tanks containing hundreds of thousands of cubic meters of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Approximately 68 tanks are known or assumed to have leaked contamination to the soil. Some of the tank contents have reacted to form flammable gases, introducing additional safety risks. These tanks must be maintained in a safe condition and eventually remediated to minimize the risk of waste migration and/or exposure to workers, the public, and the environment. However, programmatic drivers are more ambitious than baseline technologies and budgets will support. Science and technology development investments are required to reduce the technical and programmatic risks associated with the tank remediation baselines. The Tanks Focus Area (TFA) was initiated in 1994 to serve as the DOE Office of Environmental Management's (EM's) national technology development program. for radioactive waste tank remediation. The national program was formed to increase integration and realize greater benefits from DOE's technology development budget. The TFA is responsible for managing, coordinating, and leveraging technology development to support DOE's five major tank sites: Hanford Site (Washington), Idaho National Engineering and Environmental Laboratory (INEEL) (Idaho), Oak Ridge Reservation (ORR) (Tennessee), Savannah River Site (SRS) (South Carolina), and West Valley Demonstration Project (WVDP) (New York). Its technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank with safety integrated into all the functions. The TFA integrates program activities across EM organizations that fund tank technology development, including the Offices of Waste Management (EM-30), Environmental Restoration (EM-40), and Science and Technology (EM-50 or OST).

  1. TFA Tank Focus Area - multiyear program plan FY98-FY00

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation problem with hundreds of waste tanks containing hundreds of thousands of cubic meters of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Approximately 80 tanks are known or assumed to have leaked. Some of the tank contents have reacted to form flammable gases, introducing additional safety risks. These tanks must be maintained in a safe condition and eventually remediated to minimize the risk of waste migration and/or exposure to workers, the public, and the environment. However, programmatic drivers are more ambitious than baseline technologies and budgets will support. Science and technology development investments are required to reduce the technical and programmatic risks associated with the tank remediation baselines. The Tanks Focus Area (TFA) was initiated in 1994 to serve as the DOE`s Office of Environmental Management`s (EM`s) national technology development program for radioactive waste tank remediation. The national program was formed to increase integration and realize greater benefits from DOE`s technology development budget. The TFA is responsible for managing, coordinating, and leveraging technology development to support DOE`s four major tank sites: Hanford Site (Washington), Idaho National Engineering and Environmental Laboratory (INEEL) (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank with safety integrated into all the functions. The TFA integrates program activities across organizations that fund tank technology development EM, including the Offices of Waste Management (EM-30), Environmental Restoration (EM-40), and Science and Technology (EM-50).

  2. FY 2013 INL SITE SUSTAINABILITY PLAN WITH THE FY 2012 ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Ernest L. Fossum; Steve A. Birrer

    2012-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  3. Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

    International Nuclear Information System (INIS)

    CLARK, D.E.

    2000-01-01

    The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This

  4. Independent Auditors Report on the FY 2015 DoD Detailed Accounting Report for the Funds Obligated for National Drug Control Program Activities

    Science.gov (United States)

    2016-01-29

    accepted government auditing standards. Those standards require that we plan and perform the attestation to obtain sufficient, appropriate evidence to...FY 2015 or the associated assertions were not presented fairly, in all material respects, in conformity with the Circular. Lorin T. Venable

  5. 78 FR 5481 - Quagga Mussel Strategic Planning Meeting

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-HQ-FHC-2013-N008; 94140-1341-0000-N5] Quagga Mussel Strategic Planning Meeting AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: This notice announces a meeting to gather information for planning an FY13 strategy to...

  6. LDRD Annual Report FY2006

    International Nuclear Information System (INIS)

    Sketchley, J A; Kotta, P; De Yoreo, J; Jackson, K; van Bibber, K

    2007-01-01

    The Laboratory Directed Research and Development (LDRD) Program, authorized by Congress in 1991 and administered by the Laboratory Science and Technology Office, is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the missions of the Laboratory, the Department of Energy, and National Nuclear Security Administration in national security, energy security, environmental management, bioscience and technology to improve human health, and breakthroughs in fundamental science and technology. The accomplishments described in this Annual Report demonstrate the strong alignment of the LDRD portfolio with these missions and contribute to the Laboratory's success in meeting its goals. The LDRD budget of $92 million for FY2006 sponsored 188 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific quality and mission relevance. Each year, the number of deserving proposals far exceeds the funding available, making the selection a tough one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory's multidisciplinary team approach to science and technology. Safeguarding the nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle for attracting and retaining the best and the brightest

  7. LDRD FY2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Kotta, P. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kline, K. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2005-02-28

    The Laboratory Directed Research and Development (LDRD) Program is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the missions of the Laboratory, the Department of Energy, and the National Nuclear Security Administration in national security, homeland security, energy security, environmental management, bioscience and healthcare technology, and breakthroughs in fundamental science and technology. The LDRD Program was authorized by Congress in 1991 and is administered by the Laboratory Science and Technology Office. The accomplishments described in this Annual Report demonstrate how the LDRD portfolio is strongly aligned with these missions and contributes to the Laboratory’s success in meeting its goals. The LDRD budget of $69.8 million for FY2004 sponsored 220 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific and technical quality and mission relevance. Each year, the number of meritorious proposals far exceeds the funding available, making the selection a challenging one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the Nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory’s multidisciplinary team approach to science and technology. Safeguarding the Nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle

  8. FY 1992 report on the Coal Liquefaction Committee; 1992 nendo sekitan ekika iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The paper reported activities of the Coal Liquefaction Committee in FY 1992. In the 1st committee meeting, report/discussion were made of the summary of the FY 1992 R and D plan on the bituminous coal liquefaction, brown coal liquefaction and the common/basic technology. Further, the following were reported as topics: results of the operation by bituminous coal liquefaction PSU and small equipment, state of arrangement of the results of the brown coal liquefaction project, making of the basic policy for development of the common/basic technology, construction of package of coal liquefaction technology. In the 2nd committee meeting, the summary of the results of the FY 1992 R and D was reported/discussed. As to the development of bituminous coal liquefaction technology, study using pilot plant and support study were reported. Concerning the development of brown coal liquefaction technology, study using a 50t/d pilot plant and complementary study of operation. Relating to the development of the common/basic technology, trial manufacture/development of plant equipment/materials, survey of selection of coal kind, etc. The paper also reported a scheme on the evaluation of efficiency of the brown coal liquefaction process. (NEDO)

  9. FY 1991 report on the bituminous coal liquefaction section; 1991 nendo rekiseitan ekikabukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The paper reported activities of the bituminous coal liquefaction section in FY 1991. In the 1st bituminous coal liquefaction section meeting, report/discussion were made on the outline of the plan on the FY 1991 research using pilot plant and the support study of pilot plant. In the 2nd section meeting, report was made on 'How the development of coal liquefaction technology should be in the 21st century,' a report made by the joint section of bituminous coal/brown coal liquefaction. In the 3rd section meeting, report/discussion were made on the state of progress of the FY 1991 R and D and results. In the study using the bituminous coal liquefaction pilot plant, report was made on the outline of construction of a 150t/d pilot plant, study on the acquisition of material balance, analytical study of the data on liquefaction tower, testing survey on properties of coal slurry, and testing survey on slurry preheating furnace. In the support study of pilot plant, report was made on the study using 1t/d PUS, study on the development of the optimum coal refining technology and improvement in the distillate distribution, study of conditions for coal liquefaction and study of solvent hydrogenation catalyst. (NEDO)

  10. Annual report of JMTR, FY2006. April 1, 2006 - March 31, 2007

    International Nuclear Information System (INIS)

    2008-03-01

    During the FY2006 (April 2006 to March 2007), the Japan Materials Testing Reactor (JMTR) was operated for three operation cycles from 162nd cycle to 165th cycle. Various irradiation tests and post-irradiation examinations (PIEs) were performed for studies on Irradiation Assisted Stress Corrosion Cracking (IASCC) of light-water-reactor internals, development of the fusion blanket, basic materials researches, radioisotope production, and so on. The operation was stopped by 165th cycle according to schedule. And maintenance work and preservation work of the facilities has been started for the refurbishment of the JMTR. Renewal of equipments and aging management of equipments and reactor facilities were carried out according to long-term maintenance plan which was based on periodical evaluation related to maintenance and safety management of reactor facilities. Regarding development on irradiation techniques, the in-situ irradiation tests using load control unit which was developed for in-pile SCC tests of IASCC studies were finished. At the hot laboratory, PIEs for the Radiation Induced Surface Activation (RISA) capsule were performed with the X-ray diffract meter which was moved from the Nuclear Science Research Institute. Under the Arrangement for the Implementation of Cooperative Research Program between the JAEA and the Korea Atomic Energy Research Institute (KAERI), mutual exchange was conducted for information exchange of irradiation and PIE techniques. As for the refurbishment and restart of JMTR, contents of the midterm targets were changed according to unofficial notification of budget in FY2007 by the Ministry of Finance. And it was officially decided to start refurbishment work at FY2007 for restart of the JMTR in FY2011. (author)

  11. Laboratory Directed Research and Development Program FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Todd C.

    2005-03-22

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Goals that are codified in DOE's September 2003 Strategic Plan, with a primary focus on Advancing Scientific Understanding. For that goal, the Fiscal Year (FY) 2004 LDRD projects support every one of the eight strategies described in the plan. In addition, LDRD efforts support the goals of Investing in America's Energy Future (six of the fourteen strategies), Resolving the Environmental Legacy (four of the eight strategies), and Meeting National Security Challenges (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD supports Office of Science strategic plans, including the 20 year Scientific Facilities Plan and the draft Office of Science Strategic Plan. The research also

  12. United States Army Annual Financial Statement FY00. The Army in Transformation Responsive to the Needs of the Nation

    Science.gov (United States)

    2000-01-01

    continuing cost-cutting measures. Improvements have included establishing clearer customer-provider relationships, adopting private market mechanisms...measured by dividing these costs by gross wholesale sales. In FY 2000, the wholesale division achieved a $1.007 unit cost goal ( UCG ). Target UCG was...0.99. The over-execution of the UCG was due to higher than expected credit. Credit was over plan as a result of the Retail activities turning in more

  13. Accelerator/Experiment Operations - FY 2016

    International Nuclear Information System (INIS)

    Blake, A.; Convery, M.; Geer, S.; Geesaman, D.; Harris, D.; Johnson, D.; Lang, K.; McFarland, K.; Messier, M.; Moore, C. D.; Newhart, D.; Reimer, P. E.; Plunkett, R.; Rominsky, M.; Sanchez, M.; Schmidt, J. J.; Shanahan, P.; Tate, C.; Thomas, J.; Donatella Torretta, Donatella Torretta; Matthew Wetstein, Matthew Wetstein

    2016-01-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  14. Accelerator/Experiment Operations - FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Blake, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Convery, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geer, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geesaman, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Harris, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Lang, K. [Argonne National Lab. (ANL), Argonne, IL (United States); McFarland, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Messier, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, C. D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Newhart, D. [Fermilab; Reimer, P. E. [Argonne; Plunkett, R. [Fermilab; Rominsky, M. [Fermilab; Sanchez, M. [Iowa State U.; Schmidt, J. J. [Fermilab; Shanahan, P. [Fermilab; Tate, C. [Fermilab; Thomas, J. [University Coll. London; Donatella Torretta, Donatella Torretta [Fermilab; Matthew Wetstein, Matthew Wetstein [Iowa State University

    2016-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  15. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    International Nuclear Information System (INIS)

    NA

    2005-01-01

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OSTandI) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OSTandI's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program

  16. Photovoltaic Subcontract Program. Annual report, FY 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.

  17. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    2005-07-27

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OST&I) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OST&I's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program.

  18. FY14 LLNL OMEGA Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fournier, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Baker, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barrios, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bernstein, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brown, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chen, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Johnson, M. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jenei, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ma, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNabb, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moore, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Nagel, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patel, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Perez, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ross, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rygg, J. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zylstra, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-10-13

    In FY14, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 324 target shots in FY14, with 246 shots using just the OMEGA laser system, 62 shots using just the EP laser system, and 16 Joint shots using Omega and EP together. Approximately 31% of the total number of shots (62 OMEGA shots, 42 EP shots) shots supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 69% (200 OMEGA shots and 36 EP shots, including the 16 Joint shots) were dedicated to experiments for High- Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.

  19. Photovoltaic Program Branch annual report, FY 1989

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K A [ed.

    1990-03-01

    This report summarizes the progress of the Photovoltaic (PV) Program Branch of the Solar Energy Research Institute (SERI) from October 1, 1988, through September 30, 1989. The branch is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year (FY) 1989, this included nearly 50 subcontracts, with a total annualized funding of approximately $13.1 million. Approximately two-thirds of the subcontracts were with universities, at a total funding of nearly $4 million. The six technical sections of the report cover the main areas of the subcontracted program: Amorphous Silicon Research, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, New Ideas, and University Participation. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1989, and future research directions. Each report will be cataloged individually.

  20. Annual Report: Photovoltaic Subcontract Program FY 1991

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K. A. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    1992-03-01

    This report summarizes the fiscal year (FY) 1991 (October 1, 1990, through September 30, 1991) progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High Efficiency Concepts, the New Ideas Program, the University Participation Program, and the Photovoltaic Manufacturing Technology (PVMaT) project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1991, and future research directions.

  1. FY15 LLNL OMEGA Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Baker, K. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barrios, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Beckwith, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Casey, D. T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chen, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fournier, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Frenje, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lazicki, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNaney, J. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pak, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wehrenberg, C. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Widmann, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-12-04

    In FY15, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 468 target shots in FY15, with 315 shots using just the OMEGA laser system, 145 shots using just the EP laser system, and 8 Joint shots using Omega and EP together. Approximately 25% of the total number of shots (56 OMEGA shots and 67 EP shots, including the 8 Joint shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 75% (267 OMEGA shots and 86 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.

  2. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  3. Federal Research and Development Funding: FY2009

    Science.gov (United States)

    2009-05-22

    are funded through the NIH Management Fund, financed by taps on other NIH appropriations.) President Bush’s FY2009 budget proposal gave most of the... Alchemy of the 21st Century,” remarks, Texas Academy of Medicine, Engineering and Science Fourth Annual Conference, Austin, Texas, January 4, 2007...significant decrease in financing for MEP. Funding for in-house research and development under the Scientific and Technology Research and Services (STRS

  4. Federal Research and Development Funding: FY2010

    Science.gov (United States)

    2010-01-12

    Foundation, “Transformative Research: The Artistry and Alchemy of the 21st Century,” remarks, Texas Academy of Medicine, Engineering and Science Fourth Annual...Administration’s budget and both House and Senate bills. Financing for the Technology Innovation Program (TIP) is budgeted at $69.9 million, an increase...would have increased 13.3% to $534.6 million. The Manufacturing Extension Program received $124.7 million, 13.4% more than FY2009, while financing for

  5. Security Engineering FY17 Systems Aware Cybersecurity

    Science.gov (United States)

    2017-12-07

    Security Engineering – FY17 Systems Aware Cybersecurity Technical Report SERC-2017-TR-114 December 7 2017 Principal Investigator: Dr...December 7, 2017 Copyright © 2017 Stevens Institute of Technology, Systems Engineering Research Center The Systems Engineering Research Center (SERC...supported, in whole or in part, by the U.S. Department of Defense through the Office of the Assistant Secretary of Defense for Research and Engineering (ASD

  6. Hanford personnel dosimeter supporting studies FY-1981

    International Nuclear Information System (INIS)

    1982-08-01

    This report examined specific functional components of the routine external personnel dosimeter program at Hanford. Components studied included: dosimeter readout; dosimeter calibration; dosimeter field response; dose calibration algorithm; dosimeter design; and TLD chip acceptance procedures. Additional information is also presented regarding the dosimeter response to light- and medium-filtered x-rays, high energy photons and neutrons. This study was conducted to clarify certain data obtained during the FY-1980 studies

  7. Fusion reactor safety studies, FY 1977

    International Nuclear Information System (INIS)

    Darby, J.B. Jr.

    1978-04-01

    This report reviews the technical progress in the fusion reactor safety studies performed during FY 1977 in the Fusion Power Program at the Argonne National Laboratory. The subjects reported on include safety considerations of the vacuum vessel and first-wall design for the ANL/EPR, the thermal responses of a tokamak reactor first wall, the vacuum wall electrical resistive requirements in relationship to magnet safety, and a major effort is reported on considerations and experiments on air detritiation

  8. Summary of NREL's FY13-FY15 Photovoltaic Subprogram

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-31

    In this report, you will find summaries of the completed FY13-FY15 Photovoltaic projects that were funded within NREL. The summaries describe the initial motivation for the project; significant achievements, including publications, intellectual property, and collaborations; and remaining challenges. Among the NREL projects, you will find research of almost every major PV technology - from the next generation of silicon PV to relatively new organic PVs - as well as projects advancing PV module durability and characterization. Each of these projects was designed to support SunShot's goals, putting the United States one step closer to widespread use of low-cost, clean electricity.

  9. Solid Waste Integrated Forecast Technical (SWIFT) Report FY 2001 to FY 2046 Volume 1

    International Nuclear Information System (INIS)

    BARCOT, R.A.

    2001-01-01

    In an effort to maintain an up-to-date Solid Waste Forecast, Fluor Hanford, Inc. requested a midyear update to the FY2001 Solid Waste Forecast collected in June 2000. Below is a list of generators reporting significant changes from the baseline FY2001 forecast, as well as approved generators previously not reporting wastes. The updated data was collected in February 2001. The cumulative effect of the changes in the near term was minor. Included in this update are waste generation maps for onsite facilities. The maps are updated annually and use the baseline forecast as a data reference

  10. FY16 LLNL Omega Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ali, S. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Benstead, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Eggert, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Erskine, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Panella, A. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hua, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jarrott, L. C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jiang, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lazicki, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); LePape, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNaney, J. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moody, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pak, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rinderknecht, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ross, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rubery, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sio, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Swadling, G. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wehrenberg, C. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-12-01

    In FY16, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.

  11. Theoretical Division annual report, FY 1975. [LASL

    Energy Technology Data Exchange (ETDEWEB)

    Carruthers, P.A.

    1976-02-01

    This report presents an overview of the activities in the Theoretical Division and a summary of research highlights during FY 1975. It is intended to inform a wide audience about the theoretical work of the LASL and, therefore, contains introductory material which places recent advances in a broader context. The report is organized into two special interest reports: reactor safety research and the Advanced Research Committee, and 11 reports from the T-Division group leaders on the work of their respective groups. Main interests and responsibilities are outlined including the relationship of the group's work to the work of other T-Division groups and other divisions at the Laboratory. The description of research highlights for FY 1975 explains in a fairly simple, straightforward manner the major recent advances and their significance. Each group report is followed by a publication list for FY 1975 (330 references) and a list of talks given outside the Laboratory (140 references). 29 figures. (auth)

  12. FY16 LLNL Omega Experimental Programs

    International Nuclear Information System (INIS)

    Heeter, R. F.; Ali, S. J.; Benstead, J.; Celliers, P. M.; Coppari, F.; Eggert, J.; Erskine, D.; Panella, A. F.; Fratanduono, D. E.; Hua, R.; Huntington, C. M.; Jarrott, L. C.; Jiang, S.; Kraus, R. G.; Lazicki, A. E.; LePape, S.; Martinez, D. A.; McNaney, J. M.; Millot, M. A.; Moody, J.; Pak, A. E.; Park, H. S.; Ping, Y.; Pollock, B. B.; Rinderknecht, H.; Ross, J. S.; Rubery, M.; Sio, H.; Smith, R. F.; Swadling, G. F.; Wehrenberg, C. E.; Collins, G. W.; Landen, O. L.; Wan, A.; Hsing, W.

    2016-01-01

    In FY16, LLNL's High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.

  13. Nuclear Waste Management Program summary document, FY 1981

    International Nuclear Information System (INIS)

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel

  14. Laboratory directed research and development program, FY 1996

    International Nuclear Information System (INIS)

    1997-02-01

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) Laboratory Directed Research and Development Program FY 1996 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of the Laboratory Directed Research and Development (LDRD) program planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The Berkeley Lab LDRD program is a critical tool for directing the Laboratory's forefront scientific research capabilities toward vital, excellent, and emerging scientific challenges. The program provides the resources for Berkeley Lab scientists to make rapid and significant contributions to critical national science and technology problems. The LDRD program also advances the Laboratory's core competencies, foundations, and scientific capability, and permits exploration of exciting new opportunities. Areas eligible for support include: (1) Work in forefront areas of science and technology that enrich Laboratory research and development capability; (2) Advanced study of new hypotheses, new experiments, and innovative approaches to develop new concepts or knowledge; (3) Experiments directed toward proof of principle for initial hypothesis testing or verification; and (4) Conception and preliminary technical analysis to explore possible instrumentation, experimental facilities, or new devices

  15. Nuclear Waste Management Program summary document, FY 1981

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  16. Laboratory Directed Research and Development Program FY98

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, T. [ed.; Chartock, M.

    1999-02-05

    The Ernest Orlando Lawrence Berkeley National Laboratory (LBNL or Berkeley Lab) Laboratory Directed Research and Development Program FY 1998 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the Laboratory Directed Research and Development (LDRD) program planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The LBNL LDRD program is a critical tool for directing the Laboratory's forefront scientific research capabilities toward vital, excellent, and emerging scientific challenges. The program provides the resources for LBNL scientists to make rapid and significant contributions to critical national science and technology problems. The LDRD program also advances LBNL's core competencies, foundations, and scientific capability, and permits exploration of exciting new opportunities. All projects are work in forefront areas of science and technology. Areas eligible for support include the following: Advanced study of hypotheses, concepts, or innovative approaches to scientific or technical problems; Experiments and analyses directed toward ''proof of principle'' or early determination of the utility of new scientific ideas, technical concepts, or devices; and Conception and preliminary technical analyses of experimental facilities or devices.

  17. Laboratory directed research and development program, FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) Laboratory Directed Research and Development Program FY 1996 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of the Laboratory Directed Research and Development (LDRD) program planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The Berkeley Lab LDRD program is a critical tool for directing the Laboratory`s forefront scientific research capabilities toward vital, excellent, and emerging scientific challenges. The program provides the resources for Berkeley Lab scientists to make rapid and significant contributions to critical national science and technology problems. The LDRD program also advances the Laboratory`s core competencies, foundations, and scientific capability, and permits exploration of exciting new opportunities. Areas eligible for support include: (1) Work in forefront areas of science and technology that enrich Laboratory research and development capability; (2) Advanced study of new hypotheses, new experiments, and innovative approaches to develop new concepts or knowledge; (3) Experiments directed toward proof of principle for initial hypothesis testing or verification; and (4) Conception and preliminary technical analysis to explore possible instrumentation, experimental facilities, or new devices.

  18. Lawrence Berkeley Laboratory Institutional Plan FY 1987-1992

    Energy Technology Data Exchange (ETDEWEB)

    Various

    1986-12-01

    The Lawrence Berkeley Laboratory, operated by the University of California for the Department of Energy, provides national scientific leadership and supports technological innovation through its mission to: (1) Perform leading multidisciplinary research in general sciences and energy sciences; (2) Develop and operate unique national experimental facilities for use by qualified investigators; (3) Educate and train future generations of scientists and engineers; and (4) Foster productive relationships between LBL research programs and industry. The following areas of research excellence implement this mission and provide current focus for achieving DOE goals. GENERAL SCIENCES--(1) Accelerator and Fusion Research--accelerator design and operation, advanced accelerator technology development, accelerator and ion source research for heavy-ion fusion and magnetic fusion, and x-ray optics; (2) Nuclear Science--relativistic heavy-ion physics, medium- and low-energy nuclear physics, nuclear theory, nuclear astrophysics, nuclear chemistry, transuranium elements studies, nuclear data evaluation, and detector development; (3) Physics--experimental and theoretical particle physics, detector development, astrophysics, and applied mathematics. ENERGY SCIENCES--(1) Applied Science--building energy efficiency, solar for building systems, fossil energy conversion, energy storage, and atmospheric effects of combustion; (2) Biology and Medicine--molecular and cellular biology, diagnostic imaging, radiation biophysics, therapy and radiosurgery, mutagenesis and carcinogenesis, lipoproteins, cardiovascular disease, and hemopoiesis research; (3) Center for Advanced Materials--catalysts, electronic materials, ceramic and metal interfaces, polymer research, instrumentation, and metallic alloys; (4) Chemical Biodynamics--molecular biology of nucleic acids and proteins, genetics of photosynthesis, and photochemistry; (5) Earth Sciences--continental lithosphere properties, structures and behavior, and transport processes in geologic systems; and (6) Materials and Molecular Research--microstructures, electron microscopy, surfaces, and interfaces; solid-state and atomic physics; chemical energy, chemical physics, and reaction dynamics. Research and support activities conducted by LBL's Information and Computing Sciences and Engineering Divisions are central to the achievement of DOE goals. These divisions provide essential computational, instrumentation, and fabrication capability that strengthen the unique role of this national laboratory. The Laboratory's future is based on the multidisciplinary capability of its staff, its beneficial interactions with universities and industry, and the scientific and technical value of its programs and research facilities.

  19. Engineering, Analysis and Technology FY 1995 Site Support Program Plan

    International Nuclear Information System (INIS)

    Suyama, R.M.

    1994-09-01

    The vision of the Engineering, Analysis and Technology organization is to be recognized as the cost-effective supplier of specialized, integrated, multi-disciplined engineering teams to support Hanford missions. The mission of the Engineering, Analysis and Technology organization is to provide centralized engineering services. These services are focused on supplying technical design, analytical engineering and related support services that support Hanford's environmental restoration mission. These services include engineering analysis, design and development of systems and engineered equipment, supplying multi-disciplined engineering teams to all Hanford programs and project organizations, engineering document release, and site-wide leadership in the development and implementation of engineering standards, engineering practices, and configuration management processes

  20. Advanced Simulation and Computing FY17 Implementation Plan, Version 0

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Michel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Archer, Bill [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hendrickson, Bruce [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wade, Doug [National Nuclear Security Administration (NNSA), Washington, DC (United States). Office of Advanced Simulation and Computing and Institutional Research and Development; Hoang, Thuc [National Nuclear Security Administration (NNSA), Washington, DC (United States). Computational Systems and Software Environment

    2016-08-29

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources that support annual stockpile assessment and certification, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balance of resource, including technical staff, hardware, simulation software, and computer science solutions. ASC is now focused on increasing predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further away from the original test base. Where possible, the program also enables the use of high performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and counter nuclear terrorism.

  1. Department of Defense Strategic Sustainability Performance Plan, FY 2011

    Science.gov (United States)

    2011-01-01

    significant reductions in energy consumption and therefore emissions of carbon dioxide. A low impact development (LID) approach to stormwater... Energy and Environmental Design (LEED) silver certification and incorporate the November 2010 Unified Facilities Criteria (UFC) on Low Impact Development...Base (MCLB) Albany, in Georgia, awarded a $20 million energy savings performance contract in December 2009 for a landfill gas cogeneration project

  2. Pacific Northwest National Laboratory institutional plan FY 1997--2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research fundamental knowledge is created of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. Legacy environmental problems are solved by delivering technologies that remedy existing environmental hazards, today`s environmental needs are addressed with technologies that prevent pollution and minimize waste, and the technical foundation is being laid for tomorrow`s inherently clean energy and industrial processes. Pacific Northwest National Laboratory also applies its capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. Brief summaries are given of the various tasks being carried out under these broad categories.

  3. Pacific Northwest National Laboratory institutional plan FY 1998--2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research the lab creates fundamental knowledge of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. They solve legacy environmental problems by delivering technologies that remedy existing environmental hazards, they address today`s environmental needs with technologies that prevent pollution and minimize waste, and they are laying the technical foundation for tomorrow`s inherently clean energy and industrial processes. The lab also applies their capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. The paper summarizes individual research activities under each of these areas.

  4. Annual Sustainability Report FY 2014. Incorporates NREL Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rukavina, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-07-01

    NREL's Sustainability Program is responsible for upholding all executive orders, federal regulations, U.S. Department of Energy (DOE) orders, and goals related to sustainable and resilient facility operations. But NREL continues to expand sustainable practices above and beyond the laboratory's regulations and requirements to ensure that the laboratory fulfills its mission into the future, leaves the smallest possible legacy footprint, and models sustainable operations and behaviors on national, regional, and local levels. The report, per the GRI reporting format, elaborates on multi-year goals relative to executive orders, achievements, and challenges; and success stories provide specific examples. A section called 'Sustaining NREL's Future Through Integration' provides insight into how NREL is successfully expanding the adoption of renewable energy technologies through integration.

  5. Site Sustainability Plan with FY2015 Performance Data

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Teresa A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lapsa, Melissa Voss [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hudey, Bryce D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-12-01

    Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory in the US Department of Energy (DOE) complex and one of the oldest national laboratories still operating at its original site. ORNL implemented an aggressive modernization program in 2000, providing modern, energy-efficient facilities that help to support the growth of important national scientific missions while faced with the unique and challenging opportunity to integrate sustainability into legacy assets. ORNL is committed to leveraging the outcomes of DOE-sponsored research programs to maximize the efficient use of energy and natural resources across a diverse campus. ORNL leadership in conjunction with the Sustainable Campus Initiative (SCI) maintains a commitment to the integration of technical innovations into new and existing facilities, systems, and processes with a comprehensive approach to achieving DOE directives and the new Executive Order 13693. Energy efficiency, greenhouse gas reductions, climate change resiliency, and other pursuits toward integrated sustainability factor in all we do. ORNL continues to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability and continues to transform its culture and engage employees in supporting sustainability at work, at home, and in the community.

  6. Summary of activities and plans, FY 1976--1977

    International Nuclear Information System (INIS)

    Hosker, R.P. Jr.; Green, R.A.

    1976-01-01

    The Atmospheric Turbulence and Diffusion Laboratory (ATDL) in Oak Ridge, Tennessee, is operated for the Energy Research and Development Administration (ERDA) by the National Oceanic and Atmospheric Administration's (NOAA) Air Resources Laboratories, a group of research units generally concerned with problems of environmental pollution and its control. The ATDL is organized to perform research studies on atmospheric diffusion, transport, and removal of pollutants, including heat, and moisture with most emphasis on scales up to regional size (up to approximately 200 km). Current research programs include air transport studies, especially for the eastern Tennessee region; air pollution studies, including the meteorological effects of cooling towers and energy centers; research on plume and wake behavior, including effects of buoyancy, active thermal convection, and removal processes; extension of atmospheric transport, diffusion, and effluent removal models to special situations such as over-water and over-forest flows; and study of the role of forest structure on the energy balance and on diffusion

  7. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  8. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  9. Energy Resources Performance Report, FY 1991 and FY 1992.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    Once the Federal Columbia River Power System provided all the power our customers needed and surplus energy, which we sold to others. However, we planned for the time when the surplus would disappear. With our customers, we developed centralized, region-wide conservation programs to conserve energy and build the knowledge and ability to save more energy when needed. We began to look at conservation as a resource, comparing it with supply-side alternatives. Much was accomplished. In Bonneville`s service area in the 1980s, our customers acquired 300 average megawatts (aMW) of conservation savings. How? By weatherizing about 240,000 homes, by making aluminum plants, other industrial plants and commercial buildings more efficient, and also by encouraging states to adopt energy-efficient building codes. Now, our energy surplus is gone. Our customers need energy, and in a hurry. While we plan how much energy will be needed, when and by which customers, we must concurrently accelerate our efforts to acquire resources. Our 1990 Resource Program launched a strategy to do just that, starting in 1991 and 1992, with continuing activities in 1993--1995. The goals and plans of the 1990 Resource Program are still being implemented.

  10. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  11. Summary of FY 17 Assessments Sandia National Laboratories: Evaluation of FY16 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John

    2017-03-01

    This report is the milestone deliverable M4FT-17SN111102091 “Summary of Assessments Performed FY17 by SNL QA POC” for work package FT-17SN11110209 titled “Quality Assurance – SNL”. This report summarizes the FY17 assessment performed on Fuel Cycle Technologies / Spent Fuel and Waste Disposition efforts.

  12. Laboratory Directed Research and Development Program FY 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    editor, Todd C Hansen

    2009-02-23

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under

  13. Laboratory Directed Research and Development Program FY 2008 Annual Report

    International Nuclear Information System (INIS)

    Hansen, Todd C.

    2009-01-01

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the

  14. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    International Nuclear Information System (INIS)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs

  15. N Reactor Deactivation Program Plan

    International Nuclear Information System (INIS)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities · in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually

  16. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2003 THRU FY2046 VERSION 2003.1 VOLUME 2 [SEC 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    BARCOT, R.A.

    2003-12-01

    This report includes data requested on September 10, 2002 and includes radioactive solid waste forecasting updates through December 31, 2002. The FY2003.0 request is the primary forecast for fiscal year FY 2003.

  17. FY05 Targeted Technology Transfer to US Independents

    Energy Technology Data Exchange (ETDEWEB)

    Donald F. Duttlinger; E. Lance Cole

    2005-11-01

    Petroleum Technology Transfer Council (PTTC) was established by domestic crude oil and natural gas producers in 1994 as a national not-for-profit organization to address the increasingly urgent need to improve the technology-transfer process in the U.S. upstream petroleum industry. PTTC's technology-transfer programs enhance U.S. national security. PTTC administers the only nation-wide, comprehensive program dedicated to maximizing America's supplies of domestic oil and gas. PTTC conducts grassroots programs through 10 Regional Lead Organizations (RLOs) and two satellite offices, leveraging their preexisting connections with industry. This organizational structure helps bring researchers and academia to the table. Nationally and regionally, volunteers within a National Board and Regional Producer Advisory Groups guide efforts. The National Board meets three times per year, an important function being approving the annual plans and budgets developed by the regions and Headquarters (HQ). Between Board meetings, an active Management and Budget Committee guide HQ activity. PTTC itself undergoes a thorough financial audit each year. The PTTC's HQ staff plans and manages all aspects of the PTTC program, conducts nation-wide technology-transfer activities, and implements a comprehensive communications program. Networking, involvement in technical activities, and an active exhibit schedule are increasing PTTC's sphere of influence with both producers and the oilfield service sector. Circulation for ''PTTC Network News'', the quarterly newsletter, has risen to nearly 17,500. About 7,500 people receive an email Technology Alert on an approximate three-week frequency. Case studies in the ''Petroleum Technology Digest in World Oil'' appear monthly, as do ''Tech Connections'' columns in ''The American Oil and Gas Reporter''. As part of its oversight responsibility for the regions

  18. NASA FY 2000 Accountability Report

    Science.gov (United States)

    2000-01-01

    This Accountability Report consolidates reports required by various statutes and summarizes NASA's program accomplishments and its stewardship over budget and financial resources. It is a culmination of NASA's management process, which begins with mission definition and program planning, continues with the formulation and justification of budgets for the President and Congress, and ends with scientific and engineering program accomplishments. The report covers activities from October 1, 1999, through September 30, 2000. Achievements are highlighted in the Statement of the Administrator and summarized in the Report.

  19. Report of the review committee on evaluation of the research subjects in the field of advanced science research (FY2000)

    International Nuclear Information System (INIS)

    2000-10-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee, the Ad Hoc Review Committee composed of eight experts was set up under the Research Evaluation Committee of the JAERI in order to review the research themes completed in FY1999, those to be ended through FY2000, and those planned for five years starting in FY2001 in the Advanced Science Research Center. The Ad Hoc Review Committee meeting was held on July 17, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research result/plan documents submitted in advance and presentations by the Research Group Leaders. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  20. Savannah River Site's Site Specific Plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.