  1. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  2. Site Release Report for C-Well Pipeline, UE-25 Large Rocks Test Site, and 29 GSF Test Pits

    International Nuclear Information System (INIS)

    K.E. Rasmuson

    2002-01-01

    The U.S. Department of Energy has implemented a program to reclaim lands disturbed by site characterization at Yucca Mountain. Long term goals of the program are to re-establish processes on disturbed sites that will lead to self-sustaining plant communities. The Biological Opinion for Yucca Mountain Site Characterization Studies required that the U.S. Department of Energy develop a Reclamation Standards and Monitoring Plan to evaluate the success of reclamation efforts. According to the Reclamation Standards and Monitoring Plan, reclaimed sites will be monitored periodically, remediated if necessary, and eventually compared to an appropriate reference area to determine whether reclamation goals have been achieved and the site can be released from further monitoring. Plant cover, density, and species richness (success parameters) on reclaimed sites are compared to 60 percent of the values (success criteria) for the same parameters on the reference area. Small sites (less than 0.1 ha) are evaluated for release using qualitative methods while large sites (greater than 0.1 ha) are evaluated using quantitative methods. In the summer of 2000, 31 small sites reclaimed in 1993 and 1994 were evaluated for reclamation success and potential release from further monitoring. Plant density, cover, and species richness were estimated on the C-Well Pipeline, UE-25 Large Rocks test site, and 29 ground surface facility test pits. Evidence of erosion, reproduction and natural recruitment, exotic species abundance, and animal use (key attributes) also were recorded for each site and used in success evaluations. The C-Well Pipeline and ground surface facility test pits were located in a ''Larrea tridentata - Ephedra nevadensis'' vegetation association while the UE-25 Large Rocks test site was located in an area dominated by ''Coleogyne ramosissima and Ephedra nevadensis''. Reference areas in the same vegetation associations with similar slope and aspect were chosen for comparison to

  3. Site Release Reports for C-Well Pipeline, UE-25 Large Rocks Test Site, and 29 GSF Test Pits

    Energy Technology Data Exchange (ETDEWEB)

    K.E. Rasmuson

    2002-04-02

    The U.S. Department of Energy has implemented a program to reclaim lands disturbed by site characterization at Yucca Mountain. Long term goals of the program are to re-establish processes on disturbed sites that will lead to self-sustaining plant communities. The Biological Opinion for Yucca Mountain Site Characterization Studies required that the U.S. Department of Energy develop a Reclamation Standards and Monitoring Plan to evaluate the success of reclamation efforts. According to the Reclamation Standards and Monitoring Plan, reclaimed sites will be monitored periodically, remediated if necessary, and eventually compared to an appropriate reference area to determine whether reclamation goals have been achieved and the site can be released from further monitoring. Plant cover, density, and species richness (success parameters) on reclaimed sites are compared to 60 percent of the values (success criteria) for the same parameters on the reference area. Small sites (less than 0.1 ha) are evaluated for release using qualitative methods while large sites (greater than 0.1 ha) are evaluated using quantitative methods. In the summer of 2000, 31 small sites reclaimed in 1993 and 1994 were evaluated for reclamation success and potential release from further monitoring. Plant density, cover, and species richness were estimated on the C-Well Pipeline, UE-25 Large Rocks test site, and 29 ground surface facility test pits. Evidence of erosion, reproduction and natural recruitment, exotic species abundance, and animal use (key attributes) also were recorded for each site and used in success evaluations. The C-Well Pipeline and ground surface facility test pits were located in a ''Larrea tridentata - Ephedra nevadensis'' vegetation association while the UE-25 Large Rocks test site was located in an area dominated by ''Coleogyne ramosissima and Ephedra nevadensis''. Reference areas in the same vegetation associations with similar slope

  4. Pit Viper strikes at the Hanford site. Pit maintenance using robotics at the Hanford Tank Farms

    International Nuclear Information System (INIS)

    Roeder-Smith, Lynne

    2002-01-01

    The Pit Viper--a remote operations waste retrieval system--was developed to replace manual operations in the valve pits of waste storage tanks at the Hanford Site. The system consists of a typical industrial backhoe fitted with a robotic manipulator arm and is operated remotely from a control trailer located outside of the tank farm. Cameras mounted to the arm and within the containment tent allow the operator to view the entire pit area and operate the system using a joystick. The arm's gripper can grasp a variety of tools that allow personnel to perform cleaning, debris removal, and concrete repair tasks--a more efficient and less dose-intensive process than the previous 'long-pole' method. The project team overcame a variety of obstacles during development and testing of the Pit Viper system, and deployment occurred in Hanford Tank C-104 in December 2001

  5. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  6. Geologic report for the Weldon Spring Raffinate Pits Site

    International Nuclear Information System (INIS)

    1984-10-01

    A preliminary geologic site characterization study was conducted at the Weldon Spring Raffinate Pits Site, which is part of the Weldon Spring Site, in St. Charles County, Missouri. The Raffinate Pits Site is under the custody of the Department of Energy (DOE). Surrounding properties, including the Weldon Spring chemical plant, are under the control of the Department of the Army. The study determined the following parameters: site stratigraphy, lithology and general conditions of each stratigraphic unit, and groundwater characteristics and their relation to the geology. These parameters were used to evaluate the potential of the site to adequately store low-level radioactive wastes. The site investigation included trenching, geophysical surveying, borehole drilling and sampling, and installing observation wells and piezometers to monitor groundwater and pore pressures

  7. Radon and aerosol release from open-pit uranium mining

    International Nuclear Information System (INIS)

    Thomas, V.W.; Nielson, K.K.; Mauch, M.L.

    1982-08-01

    The quantity of 222 Rn (hereafter called radon) released per unit of uranium produced from open pit mining has been determined. A secondary objective was to determine the nature and quantity of airborne particles resulting from mine operations. To accomplish these objectives, a comprehensive study of the release rates of radon and aerosol material to the atmosphere was made over a one-year period from April 1979 to May 1980 at the Morton Ranch Mine which was operated by United Nuclear Corporation (UNC) in partnership with Tennessee Valley Authority (TVA). The mine is now operated for TVA by Silver King Mines. Morton Ranch Mine was one of five open pit uranium mines studied in central Wyoming. Corroborative measurements were made of radon flux and 226 Ra (hereafter called radium) concentrations of various surfaces at three of the other mines in October 1980 and again at these three mines plus a fourth in April of 1981. Three of these mines are located in the Powder River Basin, about 80 kilometers east by northeast of Casper. One is located in the Shirley Basin, about 60 km south of Casper, and the remaining one is located in the Gas Hills, approximately 100 km west of Casper. The one-year intensive study included simultaneous measurement of several parameters: continuous measurement of atmospheric radon concentration near the ground at three locations, monthly 24-hour radon flux measurements from various surfaces, radium analyses of soil samples collected under each of the flux monitoring devices, monthly integrations of aerosols on dichotomous aerosol samplers, analysis of aerosol samplers for total dust loading, aerosol elemental and radiochemical composition, aerosol elemental composition by particle size, wind speed, wind direction, temperature, barometric pressure, and rainfall

  8. Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report, Amchitka Island, Alaska, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2006-09-01

    In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides the 2006 cap inspection results.

  9. Demonstration of In-Situ Stabilization of Buried Waste at Pit G-11 at the Brookhaven National laboratory Glass Pits Disposal Site

    International Nuclear Information System (INIS)

    Dwyer, B.P.; Gilbert, J.; Heiser, J.

    1999-01-01

    In 1989 BNL was added to the EPAs National Priorities List. The site is divided into seven operable units (OU). OU-I includes the former landfill area. The field task site is noted as the AOC 2C Glass Holes location. Beginning in the 1960s and continuing into the 1980s, BNL disposed of laboratory waste (glassware, chemicals and animal carcasses) in numerous shallow pits. The drivers for remediating the pits are; historical records that indicate hazardous materials may have been disposed of in the pits; ground water contamination down gradient of the pits; a test excavation of one of the glass holes that unearthed laboratory glass bottles with unidentified liquids still contained; and the fact that BNL rests atop an EPA designated sole-source aquifer. The specific site chosen for this demonstration was pit G-11. The requirements that lead to choosing this pit were; a well characterized pit and a relatively isolated pit where our construction operations would not impact on adjacent pits. The glass holes area, including pit G-11, was comprehensively surveyed using a suite of geophysical techniques (e.g., EM-31, EM-61, GPR). Prior to stabilizing the waste form a subsurface barrier was constructed to contain the entire waste pit. The pit contents were then stabilized using a cement grout applied via jet grouting. The stabilization was performed to make removal of the waste from the pit easier and safer in terms of worker exposure. The grouting process would mix and masticate the waste and grout and form a single monolithic waste form. This large monolith would then be subdivided into smaller 4 foot by 4 foot by 10-12 foot block using a demolition grout. The smaller blocks would then be easily removed from the site and disposed of in a CERCLA waste site

  10. 200 West Area Ash Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The Ash Pit Demolition Site had two known demolition events, the first occurred in November of 1984, and the second occurred in June of 1986. These demolition events were a form of thermal treatment for discarded explosive chemical products. Because the Ash Pit Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations'', Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 200 West Area Ash Pit Demolition Site Closure Plan consists of a Part A, Form 3, Dangerous Waste Permit Application (Revision 4) and a closure plan. An explanation of the Part A, Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the Ash,Pit Demolition Site, the history of the waste treated, and the approach that will be followed to close the Ash Pit Demolition Site. Because there were no radioactively contaminated chemicals involved in the demolitions, the information on radionuclides is provided for ''information only''. Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from Ash Pit Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  11. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2002-01-01

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in

  12. Relationship between hydrogen-induced phase transformations and pitting nucleation sites in duplex stainless steel

    Energy Technology Data Exchange (ETDEWEB)

    Guo, Liqiu; Yang, Binjie; Qin, Sixiao [University of Science and Technology Beijing (China). Corrosion and Protection Center

    2016-02-15

    This paper demonstrates the hydrogen-induced phase transformation and the associated pitting nucleation sites of 2507 duplex stainless steel using scanning Kelvin probe force microscopy and magnetic force microscopy. The low potential sites in Volta potential images, which are considered as the pitting nucleation sites, are strongly dependent on the hydrogen-induced phase transformation. They firstly initiate on the magnetic martensite laths in the austenite phase or at the ferrite/austenite boundaries, and then appear near the needle-shaped microtwins in the ferrite phase, because of the difference in physicochemical properties of hydrogen-induced phase transformation microstructures.

  13. Invertebrate communities of Arctic tundra ponds as related to proximity to drill site reserve pits

    International Nuclear Information System (INIS)

    Byron, E.; Williams, N.; Hoffman, R.; Elder, B.

    1994-01-01

    Aquatic invertebrate communities were assessed for diversity and abundance in North Slope tundra ponds of Prudhoe Bay, Alaska during the summer of 1992 as part of an evaluation of potential effects of exposure to petroleum drill site reserve pits (previously used for storing drill site wastes). The invertebrate communities of these shallow, tundra ponds provide abundant food for migratory, aquatic birds that use this area during the summer breeding season. The study was designed to compare abundance and diversity estimates of invertebrates in ponds surrounding the drill sites that differed in distance (and presumed exposure) to drill site reserve pits. The pits, themselves, were not sampled as part of this study. Invertebrate abundance and diversity estimates, assessed as standard biological criteria, were evaluated relative to water chemistry of the ponds, distance to the gravel pads or reserve pits, and pond morphometry. The results indicated the importance of pond morphometry in determining the structure of the invertebrate community. Shallow, exposed ponds tended to be dominated by different invertebrate communities than deeper, narrow ponds at the margins of frost polygons. In contrast, pond chemistry and relative exposure to drill sites were not predictive of invertebrate abundance or diversity

  14. Remedial investigation and feasibility study for the Lawrence Livermore National Laboratory Site 300 Pit 7 Complex

    Energy Technology Data Exchange (ETDEWEB)

    Taffet, M.J. (Lawrence Livermore National Lab., CA (USA)); Oberdorfer, J.A. (San Jose State Univ., CA (USA)); McIlvride, W.A. (Weiss Associates, Oakland, CA (USA))

    1989-10-01

    This report summarizes the results and conclusions of the investigation of tritium and other compounds in ground water in the vicinity of landfills at the Lawrence Livermore National Laboratory (LLNL) Site 300 Pit 7 Complex. 91 refs., 110 figs., 43 tabs.

  15. Analysis of potential groundwater contamination in the vicinity of the Weldon Spring Raffinate Pits site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    Tsai, S.Y.; Peterson, J.M.; Winters, M.C.B.

    1984-08-01

    Results of the analysis of contaminant migration beneath the raffinate pits at the Weldon Spring Raffinate Pits site indicate that during a 10,000-year time period, the maximum concentrations in the water immediately beneath the pit bottoms would be about 4600 pCi/L of radium-226 (Pit 3) and about 12,000 pCi/L of uranium-238 (Pit 1); these concentrations would occur at the centers of the pit bottoms. Based on the assumptions used in this study, the radioactive contaminants in the pits would migrate no more than 2 m (7 ft) below the pit bottoms. Because 6 to 12 m (20 to 40 ft) of silty clays underlie the raffinate pits, the radioactive contaminants would take several tens of thousands of years to reach nearby groundwater supplies. Although the results of these analyses indicate that a high degree of confinement is provided by the four raffinate pits, it should be noted that the validity of such analyses rests on the quality of the parameter values utilized. Due to a lack of current site-specific data for some physical parameters, it has been necessary to use historical and regional data for these values. The values cited are at times inconsistent and contradictory, e.g., the wide range of values indicated for the permeability of clays underlying the pits. However, these were the only data available. The analysis reported herein indicates that within the limitations of the available data, use of the Raffinate Pits site for long-term management of radioactive materials such as those currently being stored in the four pits appears to be feasible. 24 references, 14 figures, 7 tables

  16. 218 E-8 Borrow Pit Demolition Site clean closure soil evaluation report

    International Nuclear Information System (INIS)

    Korematsu-Olund, D.M.

    1995-01-01

    This report summarizes the sampling activities undertaken and the analytical results obtained in a soil sampling and analyses study performed for the 218 E-8 Borrow Pit Demolition Site (218 E-8 Demolition Site). The 218 E-8 Demolition Site is identified as a Resource Conservation and Recovery Act (RCRA) treatment unit that will be closed in accordance with the applicable laws and regulations. The site was used for the thermal treatment of discarded explosive chemical products. No constituents of concern were found in concentrations indicating contamination of the soil by 218 E-8 Demolition Site activities

  17. In situ vitrification demonstration at Pit 1, Oak Ridge National Laboratory. Volume 2: Site characterization report of the Pit 1 area

    Energy Technology Data Exchange (ETDEWEB)

    Spalding, B.P.; Bogle, M.A.; Cline, S.R.; Naney, M.T.; Gu, B.

    1997-12-01

    A treatability study was initiated in October 1993, initially encompassing the application of in situ vitrification (ISV) to at least two segments of Oak Ridge National Laboratory (ORNL) seepage Pit 1 by the end of fiscal year (FY) 1995. This treatability study was to have supported a possible Interim Record of Decision (IROD) or removal action for closure of one or more of the seepage pits and trenches as early as FY 1997. The Remedial Investigation/Feasibility Study for Waste Area Grouping (WAG) 7, which contains these seven seepage pits and trenches, will probably not begin until after the year 2000. This treatability study will establish the field-scale technical performance of ISV for (1) attaining the required depth, nominally 15 ft, to incorporate source contamination within and beneath the pits; (2) demonstrating field capability to overlap melt settings that are necessary to achieve fused, melted segments of the source contamination; (3) demonstrating off-gas handling technology for accommodating and minimizing the volatilization of {sup 137}Cs; (4) demonstrating adequate site characterization techniques to predict ISV melting kinetics, processing temperatures, and product durability; and (5) promoting public acceptance of ISV technology by demonstrating its safety, implementability, site impacts, and air emissions and by coordinating the treatability study within the regulatory closure process. This report summarizes the site characterization information gathered through the end of September 1996 which supports the planning and assessment of ISV for Pit 1 (objective 4 above).

  18. In situ vitrification demonstration at Pit 1, Oak Ridge National Laboratory. Volume 2: Site characterization report of the Pit 1 area

    International Nuclear Information System (INIS)

    Spalding, B.P.; Bogle, M.A.; Cline, S.R.; Naney, M.T.; Gu, B.

    1997-12-01

    A treatability study was initiated in October 1993, initially encompassing the application of in situ vitrification (ISV) to at least two segments of Oak Ridge National Laboratory (ORNL) seepage Pit 1 by the end of fiscal year (FY) 1995. This treatability study was to have supported a possible Interim Record of Decision (IROD) or removal action for closure of one or more of the seepage pits and trenches as early as FY 1997. The Remedial Investigation/Feasibility Study for Waste Area Grouping (WAG) 7, which contains these seven seepage pits and trenches, will probably not begin until after the year 2000. This treatability study will establish the field-scale technical performance of ISV for (1) attaining the required depth, nominally 15 ft, to incorporate source contamination within and beneath the pits; (2) demonstrating field capability to overlap melt settings that are necessary to achieve fused, melted segments of the source contamination; (3) demonstrating off-gas handling technology for accommodating and minimizing the volatilization of 137 Cs; (4) demonstrating adequate site characterization techniques to predict ISV melting kinetics, processing temperatures, and product durability; and (5) promoting public acceptance of ISV technology by demonstrating its safety, implementability, site impacts, and air emissions and by coordinating the treatability study within the regulatory closure process. This report summarizes the site characterization information gathered through the end of September 1996 which supports the planning and assessment of ISV for Pit 1 (objective 4 above)

  19. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  20. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001); FINAL

    International Nuclear Information System (INIS)

    2001-01-01

    knowledge. Recirculation processes within the mud pits enhance volatilization of volatile organic compounds (VOCs), thereby reducing the potential concentrations of any VOCs that may be present. A secondary source of contaminants from random truck dumping activities and leaking vehicle discharge may have released fuels, grease, motor oil, and hydraulic fluids into the mud pit effluent stream. Radionuclide contamination is not expected at these CASs based on historical information. The primary radioisotopes that could be expected, if present, are cesium-137, tritium, and strontium-90. The SAFER process ends with closure of the site based on the laboratory analytical results of the environmental samples. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 356 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the Nevada Division of Environmental Protection for review and approval

  1. Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    MacDonnell, B.A.; Obenauf, K.S.

    1996-08-01

    The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline

  2. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  3. Closure Report for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Laura A. Pastor

    2005-04-01

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 357: Mud Pits and Waste Dump, Nevada Test Site (NTS), Nevada. The CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada, U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). Corrective Action Unit 357 is comprised of 14 Corrective Action Sites (CASs) located in Areas 1, 4, 7, 8, 10, and 25 of the NTS (Figure 1-1). The NTS is located approximately 65 miles (mi) northwest of Las Vegas, Nevada. Corrective Action Unit 357 consists of 11 CASs that are mud pits located in Areas 7, 8, and 10. The mud pits were associated with drilling activities conducted on the NTS in support of the underground nuclear weapons testing. The remaining three CASs are boxes and pipes associated with Building 1-31.2el, lead bricks, and a waste dump. These CAS are located in Areas 1, 4, and 25, respectively. The following CASs are shown on Figure 1-1: CAS 07-09-02, Mud Pit; CAS 07-09-03, Mud Pit; CAS 07-09-04, Mud Pit; CAS 07-09-05, Mud Pit; CAS 08-09-01, Mud Pit; CAS 08-09-02, Mud Pit; CAS 08-09-03, Mud Pit; CAS 10-09-02, Mud Pit; CAS 10-09-04, Mud Pit; CAS 10-09-05, Mud Pit; CAS 10-09-06, Mud Pit, Stains, Material; CAS 01-99-01, Boxes, Pipes; CAS 04-26-03, Lead Bricks; and CAS 25-15-01, Waste Dump. The purpose of the corrective action activities was to obtain analytical data that supports the closure of CAU 357. Environmental samples were collected during the investigation to determine whether contaminants exist and if detected, their extent. The investigation and sampling strategy was designed to target locations and media most likely to be contaminated (biased sampling). A general site conceptual model was developed for each CAS to support and guide the investigation as outlined in the Streamlined Approach for Environmental Restoration (SAFER) Plan (NNSA/NSO, 2003b). This CR

  4. 218-E-8 Borrow Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The 218-E-8 Demolition Site was the site of a single demolition event in November of 1984. This demolition event was a form of thermal treatment for discarded explosive chemical products. Because the 218-E-8 Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations,'' Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 218-E-8 Borrow Pit Demolition Site Closure Plan consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3, Revision 4, and a closure plan. An explanation of the Part A Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the 218-E-8 Demolition Site, the history of the waste treated, and the approach that will be followed to close the 218-E-8 Demolition Site. Because there were no radioactively contaminated chemicals involved in t he demolitions at the 218-E-8 Borrow Pit site, the information on radionuclides is provided for ''information only.'' Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from 218-E-8 Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  5. Radionuclide and metal contamination in pit lakes in former U mining sites in Central Asia

    Energy Technology Data Exchange (ETDEWEB)

    Skipperud, L.; Rosseland, B.O.; Heier, L.S.; Salbu, B. [Centre for Environmental Radioactivity - CERAD, Norwegian University of Life Sciences - NMBU (Norway); Stegnar, P. [Josef Stefan Institute (Slovenia); Yunusov, M. [IA Vostokredmet (Tajikistan); Burkitbaev, L.M. [Al-Farabi Kazakh National University (Kazakhstan)

    2014-07-01

    The uranium mining industry in the USSR was established in the late 1940's - early 1950's in the former Soviet Republics of Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan as part of the nuclear weapon program. In most countries, uranium mining is considered a hazardous step of nuclear materials production, both in terms of radiation doses and in the number of people affected. Key problems have been associated with the transport of uranium and its daughters in aquatic and terrestrial ecosystems, where radionuclides are transferred from air, water, and soils into plants, fish/animals and finally to man. In this paper, special attention is paid to the assessment of radionuclides and metals in Central Asian Pit Lakes. Field works to Kurday, Kasakhstan, and Taboshar, Tajikistan, Pit Lakes have been performed. In addition to sampling of water, fish, sediments, and vegetation, in situ fractionation of water were achieved. The concentrations of U and associated trace metals were enriched in the Kurday Pit Lake and in the artesian water at the Kurday site (U exceeding the WHO guideline value for drinking water), and decreased downstream from the mining area. Uranium, As, Mo and Ni were predominantly present as mobile low molecular mass species in waters, while a significant proportion of Cr, Mn and Fe were associated with colloids and particles. Due to oxidation of divalent iron in the artesian ground water upon contact with air, Fe served as scavenger for other elements, and peak concentrations of U, Ra-isotopes, As and Mn were seen. The U concentrations in water from Taboshar Pit Lake (2.0 mg U/L) were higher than waters collected in other areas in Tajikistan. The Pit Lake and the stream water from the tailing mountain were also characterized by elevated concentrations of As, Mo, Mn and Fe, exceeding the WHO recommended values for drinking water. Uranium, As, Mo and Ni were present as low molecular mass species in the waters, and are therefore considered

  6. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions

  7. Remaining Sites Verification Package for the 128-F-2, 100-F Burning Pit Waste Site. Attachment to Waste Site Reclassification Form 2008-031

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 128-F-2 waste site consisted of multiple burn and debris filled pits located directly east of the 107-F Retention Basin and approximately 30.5 m east of the northeast corner of the 100-F Area perimeter road that runs along the riverbank. The burn pits were used for incinerating nonradioactive, combustible materials from 1945 to 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

  8. Remaining Sites Verification Package for the 128-F-2, 100-F Burning Pit Waste Site, Waste Site Reclassification Form 2008-031

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Capron

    2008-12-01

    The 128-F-2 waste site consisted of multiple burn and debris filled pits located directly east of the 107-F Retention Basin and approximately 30.5 m east of the northeast corner of the 100-F Area perimeter road that runs along the riverbank. The burn pits were used for incinerating nonradioactive, combustible materials from 1945 to 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  9. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  10. Characterization of the Burma Road Rubble Pit at the Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    Ward, K.G.; Frazier, W.L.; McAdams, T.D.; McFalls, S.L.; Rabin, M.; Voss, L.

    1996-01-01

    The Burma Road Rubble Pit (BRRP) is located at the Savannah River Site (SRS). The BRRP unit consists of two unlined earthen pits dug into surficial soil and filled with various waste materials. It was used from 1973--1983 for the disposal of dry inert rubble such as metal, concrete, lumber, poles, light fixtures, and glass. No record of the disposal of hazardous substances at the BRRP has been found. In 1983, the BRRP was closed by covering it with soil. In September 1988, a Ground Penetrating Radar survey detected three disturbed areas of soil near the BRRP, and a detailed and combined RCRA Facility Investigation/Remedial Investigation was conducted from November 1993 to February 1994 to determine whether hazardous substances were present in the subsurface, to evaluate the nature and extent of contamination, and to evaluate the risks posed to the SRS facility due to activities conducted at the BRRP site. Metals, semi-volatile organic compounds, volatile organic compounds, radionuclides and one pesticide (Aldrin) were detected in soil and groundwater samples collected from seventeen BRRP locations. A baseline risk assessment (BRA) was performed quantitatively to evaluate whether chemical and radionuclide concentrations detected in soil and groundwater at the BRRP posed an unacceptable threat to human health and the environment. The exposure scenarios identifiable for the BRRP were for environmental researchers, future residential and occupational land use. The total site noncancer hazard indices were below unity, and cancer risk levels were below 1.0E-06 for the existing and future case environmental researcher scenario. The future case residential and occupational scenarios showed total hazard and risk levels which exceeded US EPA criterion values relative to groundwater scenarios. For the most part, the total carcinogenic risks were within the 1.0E-04 to 1.0E-06 risk range. Only the future adult residential scenario was associated with risks exceeding 1.0E-04

  11. Corrective action investigation plan for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 342, the Area 23 Mercury Fire Training Pit (FTP), which is located in Area 23 at the Nevada Test Site (NTS). The NTS is approximately 88 km (55 mi) northwest of Las Vegas, Nevada. Corrective Action Unit 342 is comprised of CAS 23-56-01. The FTP is an area approximately 100 m by 140 m (350 ft by 450 ft) located west of the town of Mercury, Nevada, which was used between approximately 1965 and 1990 to train fire-fighting personnel (REECo, 1991; Jacobson, 1991). The surface and subsurface soils in the FTP have likely been impacted by hydrocarbons and other contaminants of potential concern (COPC) associated with burn activities and training exercises in the area.

  12. Shippingport Station Decommissioning Project site release protocol

    International Nuclear Information System (INIS)

    Handy, J.W.

    1988-01-01

    The Richland, Washington field office of the DOE and its Remedial Actions Contractor, GE, took possession of the SSDP site in September 1984. In February of the following year, DOE-HQ issued generic, site independent guidelines taken from existing radiation protection standards. Basic generic dose limits were English equivalents of 1 mSv (100 mrem) per year averaged over the lifetime of any individual member of the general public. Hot spot limits were given. Occupied or habitable structures were limited to 5.2 x 10 -9 C/Kg h (20mR/h). Surface contamination was limited to standards plus average and maximum contact dose rates of 2 microGy (0.2 mrad) per hour and 10 microGy (1 mrad) per hour respectively. In addition, ''all exposures ... were to be limited to levels that (were) as low as reasonably achievable (ALARA).'' Authorized limits higher than these guidelines were allowed under given exceptional circumstances. GE determined the allowable radionuclide concentrations that could remain in soil and included rubble, and not dose the resident farmer to more than 1 mSv (100 mrem) per year. Under more conservative scenarios, however, exposures were controlled for buried, potentially occupationally occupiable, concrete substructures, to souvenir items, or to buried, but potentially exposed, concrete slabs. GE incorporated the scenario's pathways into a document implementing specific site release criteria which cannot be exceeded if the site is to be released unconditionally. 3 refs., 1 fig

  13. Mud Pit Risk-Based Closure Strategy Report, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Brain Hoenes

    2004-08-01

    This report presents the findings of the human and ecological risk assessment for the NTS mud pits. The risk assessment utilizes data from 52 of the 270 NTS mud pits in conjunction with corroborative data from 87 other DOE mud pits associated with nuclear testing (at locations on the NTS, in the western United States, and Alaska) as well as relevant process knowledge. Based on the risk assessment findings, the report provides a strategy for further evaluation, characterization, and closure of all 270 NTS mud pit CASs using the Streamlined Approach for Environmental Restoration (SAFER).

  14. Extensive rill erosion and gullying on abandoned pit mining sites in Lusatia, Germany

    Science.gov (United States)

    Kunth, Franziska; Kaiser, Andreas; Vláčilová, Markéta; Schindewolf, Marcus; Schmidt, Jürgen

    2015-04-01

    As the major economic driver in the province of Lusatia, Eastern Germany, the large open-cast lignite mining sites characterize the landscape and leave vast areas of irreversible changed post-mining landscapes behind. Cost-intensive renaturation projects have been implemented in order to restructure former mine sites into stabile self-sustaining ecosystems and local recreation areas. With considerable expenditure the pits are stabilized, flooded and surrounding areas are restructured. Nevertheless, heavy soil erosion, extensive gullying and slope instability are challenges for the restructuring and renaturation of the abandoned open-cast mining sites. The majority of the sites remain inaccessible to the public due to instable conditions resulting in uncontrolled slides and large gullies. In this study a combined approach of UAV-based aerial imagery, 3D multi-vision surface reconstruction and physically-based soil erosion modelling is carried out in order to document, quantify and better understand the causes of erosion processes on mining sites. Rainfall simulations have been carried out in lausatian post mining areas to reproduce soil detachment processes and observe the responsible mechanisms for the considerable erosion rates. Water repellency and soil sealing by biological crusts were hindering infiltration and consequently increasing runoff rates despite the mainly sandy soil texture. On non-vegetated experimental plots runoff coefficients up to 87 % were measured. In a modelling routine for a major gully catchment regarding a 50 years rainfall event, simulation results reveal runoff coefficients of up to 84% and erosion rates of 118 Mg*ha^-1. At the sediment pass over point 450Mg of sediments enter the surface water bodies. A system response of this order of magnitude were unexpected by the authorities. By applying 3D multi-vision surface reconstruction a model validation is now possible and further may illustrate the great importance of soil conservation

  15. Corrective action plan for corrective action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Nacht, S.

    1999-01-01

    The Mercury Fire Training Pit is a former fire training area located in Area 23 of the Nevada Test Site (NTS). The Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting personnel at the NTS, and encompasses an area approximately 107 meters (m) (350 feet [ft]) by 137 m (450 ft). The Mercury Fire Training Pit formerly included a bermed burn pit with four small burn tanks, four large above ground storage tanks an overturned bus, a telephone pole storage area, and areas for burning sheds, pallets, and cables. Closure activities will include excavation of the impacted soil in the aboveground storage tank and burn pit areas to a depth of 1.5 m (5 ft), and excavation of the impacted surface soil downgradient of the former ASTs and burnpit areas to a depth of 0.3 m (1 ft). Excavated soil will be disposed in the Area 6 Hydrocarbon Landfill at the NTS

  16. Passive safe small reactor for distributed energy supply system sited in water filled pit at seaside

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Imayoshi, Shou

    2003-01-01

    Japan Atomic Energy Research Institute has developed a Passive Safe Small Reactor for Distributed Energy Supply System (PSRD) concept. The PSRD is an integrated-type PWR with reactor thermal power of 100 to 300 MW aimed at supplying electricity, district heating, etc. In design of the PSRD, high priority is laid on enhancement of safety as well as improvement of economy. Safety is enhanced by the following means: i) Extreme reduction of pipes penetrating the reactor vessel, by limiting to only those of the steam, the feed water and the safety valves, ii) Adoption of the water filled containment and the passive safety systems with fluid driven by natural circulation force, and iii) Adoption of the in-vessel type control rod drive mechanism, accompanying a passive reactor shut-down device. For improvement of economy, simplification of the reactor system and long operation of the core over five years without refueling with low enriched UO 2 fuel rods are achieved. To avoid releasing the radioactive materials to the circumstance even if a hypothetical accident, the containment is submerged in a pit filled with seawater at a seaside. Refueling or maintenance of the reactor can be conducted using an exclusive barge instead of the reactor building. (author)

  17. Remaining Sites Verification Package for the 128-B-2, 100-B Burn Pit No.2 Waste Site. Attchment to Waste Site Reclassification Form 2005-038

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2005-01-01

    The 128-B-2 waste site was a burn pit historically used for the disposal of combustible and noncombustible wastes, including paint and solvents, office waste, concrete debris, and metallic debris. This site has been remediated by removing approximately 5,627 bank cubic meters of debris, ash, and contaminated soil to the Environmental Restoration Disposal Facility. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  18. INEL cold test pit demonstration of improvements in information derived from non-intrusive geophysical methods over buried waste sites

    International Nuclear Information System (INIS)

    1994-01-01

    Under Contract between US DOE Idaho National Engineering Laboratory (INEL) and the Blackhawk Geosciences Division of Coleman Research Corporation (BGD-CRC), geophysical investigations were conducted to improve the detection of buried wastes. Site characterization is a costly and time consuming process with the most costly components being drilling, sampling, and chemical analysis of samples. There is a focused effort at US DOE and other agencies to investigate methodologies that reduce costs and shorten the time between characterization and clean-up. These methodologies take the form of employing non-invasive (geophysical) and minimal invasive (e.g., cone penetrometer driving) techniques of characterization, and implementing a near real-time, rational decision-making process (Expedited Site Characterization). Over the Cold Test Pit (CTP) at INEL, data were acquired with multiple sensors on a dense grid. Over the CTP the interpretations inferred from geophysical data are compared with the known placement of various waste forms in the pit. The geophysical sensors employed were magnetics, frequency and time domain electromagnetics, and ground penetrating radar. Also, because of the high data density acquired, filtering and other data processing and imaging techniques were tested. The conclusions derived from the geophysical surveys were that pit boundaries, berms between cells within the pit, and individual objects placed in the pit were best mapped by the new Geonics EM61 time domain EM metal detector. Part of the reason for the effectiveness of the time domain metal detector is that objects buried in the pit are dominantly metallic. Also, the utility of geophysical data is significantly enhanced by dimensional and 3-dimensional imaging formats. These images will particularly assist remediation engineers in visualizing buried wastes

  19. Fate and groundwater impacts of produced water releases at OSPER "B" site, Osage County, Oklahoma

    Science.gov (United States)

    Kharaka, Y.K.; Kakouros, E.; Thordsen, J.J.; Ambats, G.; Abbott, M.M.

    2007-01-01

    For the last 5 a, the authors have been investigating the transport, fate, natural attenuation and ecosystem impacts of inorganic and organic compounds in releases of produced water and associated hydrocarbons at the Osage-Skiatook Petroleum Environmental Research (OSPER) "A" and "B" sites, located in NE Oklahoma. Approximately 1.0 ha of land at OSPER "B", located within the active Branstetter lease, is visibly affected by salt scarring, tree kills, soil salinization, and brine and petroleum contamination. Site "B" includes an active production tank battery and adjacent large brine pit, two injection well sites, one with an adjacent small pit, and an abandoned brine pit and tank battery site. Oil production in this lease started in 1938, and currently there are 10 wells that produce 0.2-0.5 m3/d (1-3 bbl/d) oil, and 8-16 m3/d (50-100 bbl/d) brine. Geochemical data from nearby oil wells show that the produced water source is a Na-Ca-Cl brine (???150,000 mg/L TDS), with high Mg, but low SO4 and dissolved organic concentrations. Groundwater impacts are being investigated by detailed chemical analyses of water from repeated sampling of 41 boreholes, 1-71 m deep. The most important results at OSPER "B" are: (1) significant amounts of produced water from the two active brine pits percolate into the surficial rocks and flow towards the adjacent Skiatook reservoir, but only minor amounts of liquid petroleum leave the brine pits; (2) produced-water brine and minor dissolved organics have penetrated the thick (3-7 m) shale and siltstone units resulting in the formation of three interconnected plumes of high-salinity water (5000-30,000 mg/L TDS) that extend towards the Skiatook reservoir from the two active and one abandoned brine pits; and (3) groundwater from the deep section of only one well, BR-01 located 330 m upslope and west of the site, appear not to be impacted by petroleum operations. ?? 2007.

  20. Environmental assessment for the expansion and operation of the Central Shops Borrow Pit at the Savannah River Site

    International Nuclear Information System (INIS)

    1997-03-01

    The Department of Energy (DOE) prepared this Environmental Assessment (EA) to assess the potential environmental impacts of the proposed expansion and operation of an existing borrow pit at the Savannah River Site (SRS), located near Aiken, South Carolina. A borrow pit is defined as an excavated area where material has been dug for use as fill at another location. The proposed action would entail the areal enlargement, continued operation, and eventual close-out of the established facility known as the Central Shops Borrow Pit. Operations at SRS supporting waste site closure and the construction and maintenance of site facilities and infrastructure require readily available suitable soil for use as fill material. With the recent depletion of the other existing on-site sources for such material, DOE proposes to expand the existing facility. The National Environmental Policy Act requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an Environmental Impact Statement (EIS)

  1. Remaining Sites Verification Package for the 128-B-3 Burn Pit Site, Waste Site Reclassification Form 2006-058

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-11-17

    The 128-B-3 waste site is a former burn and disposal site for the 100-B/C Area, located adjacent to the Columbia River. The 128-B-3 waste site has been remediated to meet the remedial action objectives specified in the Remaining Sites ROD. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results of sampling at upland areas of the site also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  2. Site release in the decommissioning of nuclear installations

    International Nuclear Information System (INIS)

    Revilla, Jose Luis; Sanz, Maria Teresa; Marugan, Inmaculada; Simon, Inmaculada; Martin, Manuel; Solis, Susana; Sterling, Agustina

    2008-01-01

    Spanish regulatory framework for the decommissioning process of a nuclear facility ends up with a decommission statement, which releases the licence-holder of the facility from its responsibilities as an operator. It also establishes -where a restricted site release applies- the appropriate future use restrictions, and the responsible of both maintaining such restrictions and ensuring their compliance. Releasing a site implies eliminating all radiological monitoring. The Regulations, however, did not specify either the radiological conditions to be met for the site to be released, or the possibility of a partial release -with or without restrictions-. In case of restricted site release, the Regulations did not specify either the required criteria for such a release. This paper presents the main features of the Safety Instruction IS-13 'Radiological criteria for the release of nuclear facilities sites' issued recently by the Spanish Nuclear Safety Council as a new specific regulation. This Safety Instruction establishes the requirements and conditions for the release of nuclear facility sites, that is, radiological criteria on the effective dose to the public, partial release of nuclear facility sites and restricted release of nuclear facility sites. (author).

  3. Remaining Sites Verification Package for the 126-B-3, 184-B Coal Pit Dumping Area, Waste Site Reclassification Form 2005-028

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Dittmer

    2006-08-07

    The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition operations in the 1970s, the site was used for disposal of demolition debris from 100-B/C Area facilities. The site has been remediated by removing debris and contaminated soils. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  4. Remaining Sites Verification Package for the 126-B-3, 184-B Coal Pit Dumping Area. Attachment to Waste Site Reclassification Form 2005-028

    International Nuclear Information System (INIS)

    Dittmer, L.M.

    2006-01-01

    The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition operations in the 1970s, the site was used for disposal of demolition debris from 100-B/C Area facilities. The site has been remediated by removing debris and contaminated soils. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River

  5. Superfund and Toxic Release Inventory Sites - MDC_ContaminatedSite

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — A point feature class of open DERM Contaminated sites - see phase code for status of site. Contaminated sites identifies properties where environmental contamination...

  6. Remaining Sites Verification Package for the 100-F-44:4, Discovery Pipeline in Silica Gel Pit. Attachment to Waste Site Reclassification Form 2008-030

    International Nuclear Information System (INIS)

    Capron, J.M.

    2008-01-01

    The 100-F-44:4, Discovery Pipeline in Silica Gel Pit subsite is located in the 100-FR-1 Operable Unit of the Hanford Site, near the location of the former 110-F Gas Storage Tanks structure. The 100-F-44:4 subsite is a steel pipe discovered October 17, 2004, during trenching to locate the 118-F-4 Silica Gel Pit. Based on visual inspection and confirmatory investigation sampling data, the 100-F-44:4 subsite is a piece of non-hazardous electrical conduit debris. The 100-F-44:4 subsite supports unrestricted future use of shallow zone soil and is protective of groundwater and the Columbia River. No residual contamination exists within the deep zone. Therefore, no deep zone institutional controls are required

  7. Closure report for CAU No. 450: Historical UST release sites, Nevada Test Site. Volume 1

    International Nuclear Information System (INIS)

    1997-09-01

    This report addresses the closure of 11 historical underground storage tank (UST) release sites within various areas of the Nevada Test Site (NTS). The closure of each hydrocarbon release has not been documented, therefore, this report addresses the remedial activities completed for each release site. The hydrocarbon release associated with each tank site within CAU 450 was remediated by excavating the impacted soil. Clean closure of the release was verified through soil sample analysis by an off-site laboratory. All release closure activities were completed following standard environmental and regulatory guidelines. Based upon site observations during the remedial activities and the soil sample analytical results, which indicated that soil concentrations were below the Nevada Administrative code (NAC) Action Level of 100 mg/kg, it is anticipated that each of the release CASs be closed without further action

  8. Nucleation sites of Ge nanoislands grown on pit-patterned Si substrate prepared by electron-beam lithography

    Science.gov (United States)

    Smagina, Zh. V.; Zinovyev, V. A.; Rudin, S. A.; Novikov, P. L.; Rodyakina, E. E.; Dvurechenskii, A. V.

    2018-04-01

    Regular pit-patterned Si(001) substrates were prepared by electron-beam lithography followed by plasma chemical etching. The geometry of the pits was controlled by varying the etching conditions and the electron-beam exposure duration. It was shown that the location of three-dimensional (3D) Ge nanoislands subsequently grown on the pit-patterned Si substrates depends on the shape of the pit bottom. In the case of pits having a sharp bottom, 3D Ge islands nucleate inside the pits. For pits with a wide flat bottom, the 3D Ge island nucleation takes place at the pit periphery. This effect is attributed to the strain relaxation depending not only on the initial pit shape, but also on its evolution during the Ge wetting layer deposition. It was shown by Monte Carlo simulations that in the case of a pit with a pointed bottom, the relaxation is most effective inside the pit, while for a pit with a wide bottom, the most relaxed area migrates during Ge deposition from the pit bottom to its edges, where 3D Ge islands nucleate.

  9. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible

  10. Epidemiological Studies of Health Outcomes among Troops Deployed to Burn Pit Sites

    Science.gov (United States)

    2010-05-01

    0.98 0.93 1.02 0.94 0.90 0.98 Arifjan 6539 710 109 1.14 1.06 1.23 1.05 0.98 1.13 Buehring 1590 146 92 0.96 0.82 1.13 1.04 0.89 1.23 Taji 3539 321 91...exposure to a documented burn pit, for the following outcomes: (1) birth outcomes in infants born to military men and women exposed before and during...2004 and December 31, 2007, born to active-duty military men and women . For all other outcomes, data from consenting participants who completed

  11. Operators guide: Atmospheric Release Advisory Capability (ARAC) site facility

    International Nuclear Information System (INIS)

    Lawver, B.S.

    1977-01-01

    In this report capabilities and services are described for the Atmospheric Release Advisory Capability (ARAC). The ARAC site system and its operating procedures and interactions with the ARAC central facility located at LLL is outlined. ARAC is designed to help officials at designated ERDA sites and other locations in estimating the effects of atmospheric releases of radionuclides or other hazardous materials by issuing real-time advisories to guide them in their planning

  12. Operators guide: Atmospheric Release Advisory Capability (ARAC) site facility

    International Nuclear Information System (INIS)

    Cassaro, E.; Lomonaco, L.

    1979-01-01

    The Atmospheric Release Advisory Capability (ARAC) is designed to help officials at designated DOE sites and other locations in estimating the effects of atmospheric releases of radionuclides or other hazardous materials by issuing real-time advisories to guide them in their planning. This report outlines the capabilities and sources of ARAC, and in more detail describes an ARAC Site Facility, its operating procedures and interactions with the ARAC Central Facility (ACF) located at LLL

  13. Superfund record of decision (EPA Region 4): Potter's septic tank service pits site, Brunswick County, Sandy Creek, NC. (First remedial action), August 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 5-acre Potter's Septic Tank Service Pits (Potter's Pits) is located in a rural section of Brunswick County, North Carolina. The site is situated within a residential community known as the Town of Sandy Creek. Disposal practices consisted of placing petroleum waste products and septic tank sludges either in shallow unlined pits or directly on the land surface. The ROD addresses the ground water treatment and contaminated soils at the site. Primary contaminants of concern affecting surface and subsurface soil are VOCs and semi-VOCs, including napthalene, metals, and pesticides. Ground water is contaminated with VOCs, including benzene, ethyl benzene, toluene; other organics including naphthalene, and xylenes; and metals, including chromium and lead. The selected remedial action for the site includes excavating all soils that exceed the soil clean-up standards; treating contaminated soils by using an onsite ex-situ thermal desorption process; performing secondary treatment of the concentrated organic contaminants, and sampling and analyzing the treatment residue

  14. Tale of two pit lakes: initial results of a three-year study of the Main Zone and Waterline pit lakes near Houston, British Columbia, Canada

    Science.gov (United States)

    Crusius, John; Pieters, R.; Leung, A.; Whittle, P.; Pedersen, T.; Lawrence, G.; McNee, J.J.

    2003-01-01

    Pit lakes are becoming increasingly common in North America as well as in the rest of the world. They are created as openpit mines fill passively with ground water and surface inflows on cessation of mining activity. In many instances, the water quality in these pit lakes does not meet regulatory requirements due to a number of influences. The most important are the oxidation of sulfide minerals and the associated release of acid and metals and the flushing of soluble metals during pit filling. Examples of pit lakes with severe water-quality problems include the Berkeley Pit lake (Butte, MT) and the Liberty Pit lake (Nevada), whose waters are characterized by a pH near 3 and Cu concentrations as high as ~150 mg/L (Miller et al., 1996; Davis and Eary, 1997). The importance of the problem can be seen in the fact that some of these sites in the United States are Superfund sites.

  15. Completion of decommissioning: Monitoring for site release and license termination

    International Nuclear Information System (INIS)

    Boing, L.E.

    1997-01-01

    To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption

  16. Closure Report for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Al Wickline

    2007-01-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 553 are located within Areas 19 and 20 of the Nevada Test Site. Corrective Action Unit 553 is comprised of the following CASs: 19-99-01, Mud Spill 19-99-11, Mud Spill 20-09-09, Mud Spill 20-99-03, Mud Spill. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 553 were met. To achieve this, the following actions were or will be performed: Review the current site conditions including the concentration and extent of contamination. Implement any corrective actions necessary to protect human health and the environment. Properly dispose of corrective action and investigation wastes. Document the Notice of Completion and closure of CAU 553 to be issued by Nevada Division of Environmental Protection

  17. Limited mobility of dioxins near San Jacinto super fund site (waste pit) in the Houston Ship Channel, Texas due to strong sediment sorption.

    Science.gov (United States)

    Louchouarn, Patrick; Seward, Shaya M; Cornelissen, Gerard; Arp, Hans Peter H; Yeager, Kevin M; Brinkmeyer, Robin; Santschi, Peter H

    2018-02-20

    Sediments from a waste pit in Houston Ship Channel (HSC) were characterized using a number of molecular markers of natural organic matter fractions (e.g., pyrogenic carbon residues, PAHs, lignins), in addition to dioxins, in order to test the hypothesis that the dispersal and mobility of dioxins from the waste pit in the San Jacinto River is minimal. Station SG-6, sampled at the site of the submerged waste pit, had the highest dioxin/furan concentrations reported for the Houston Ship Channel/Galveston Bay (HSC/GB) system (10,000-46,000 pg/g), which translated into some of the highest reported World Health Organization Toxic Equivalents (TEQs: 2000-11,000 pg/g) in HSC sediments. Using a multi-tracer approach, this study confirmed our hypothesis that sludges from chlorinated pulps are a very likely source of dioxins/furans to this pit. However, this material also contained large quantities of additional hydrophobic organic contaminants (PAHs) and pyrogenic markers (soot-BC, levoglucosan), pointing to the co-occurrence of petroleum hydrocarbons and combustion byproducts. Comparison of dioxin/furan signatures in the waste pit with those from sediments of the HSC and a control site suggests that the remobilization of contaminated particles did not occur beyond the close vicinity of the pit itself. The dioxins/furans in sediments outside the waste pit within the HSC are rather from other diffuse inputs, entering the sedimentary environment through the air and water, and which are comprised of a mixture of industrial and municipal sources. Fingerprinting of waste pit dioxins indicates that their composition is typical of pulp and paper sources. Measured pore water concentrations were 1 order of magnitude lower than estimated values, calculated from a multiphase sorption model, indicating low mobility of dioxins within the waste pit. This is likely accomplished by co-occurring and strong sorbing pyrogenic and petrogenic residues in the waste pit, which tend to keep

  18. The Atmospheric Release Advisory Capability Site Workstation System

    International Nuclear Information System (INIS)

    Foster, K.T.; Sumikawa, D.A.; Foster, C.S.; Baskett, R.L.

    1993-01-01

    The Atmospheric Release Advisory Capability (ARAC) is a centralized emergency response service that assesses the consequences that may result from an atmospheric release of toxic material. ARAC was developed by the Lawrence Livermore National Laboratory (LLNL) for the Departments of Energy (DOE) and Defense (DOD) and responds principally to radiological accidents. ARAC provides radiological health and safety guidance to decision makers in the form of computer-generated estimates of the effects of an actual, or potential release of radioactive material into the atmosphere. Upon receipt of the release scenario, the ARAC assessment staff extracts meteorological, topographic, and geographic data from resident world-wide databases for use in complex, three-dimensional transport and diffusion models. These dispersion models generate air concentration (or dose) and ground deposition contour plots showing estimates of the contamination patterns produced as the toxic material is carried by the prevailing winds. To facilitate the ARAC response to a release from specific DOE and DOD sites and to provide these sites with a local emergency response tool, a remote Site Workstation System (SWS) is being placed at various ARAC-supported facilities across the country.. This SWS replaces the existing antiquated ARAC Site System now installed at many of these sites. The new system gives users access to complex atmospheric dispersion models that may be run either by the ARAC staff at LLNL, or (in a later phase of the system) by site personnel using the computational resources of the SWS. Supporting this primary function are a variety of SWS-resident supplemental capabilities that include meteorological data acquisition, manipulation of release-specific databases, computer-based communications, and the use of a simpler Gaussian trajectory puff model that is based on Environmental Protection Agency's INPUFF code

  19. Remedial Investigation of Hanford Site Releases to the Columbia River

    International Nuclear Information System (INIS)

    Lerch, J.A.

    2009-01-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts of Hanford Site hazardous substance releases to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The impacts are now being assessed under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 via a remedial investigation. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River has been developed and issued to initiate the remedial investigation. The work plan establishes a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities began in October 2008 and are anticipated to continue into Fall 2009 over a 120 mile stretch of the Columbia River. Information gained from performing this remedial investigation will ultimately be used to help make final regulatory decisions for cleaning up Hanford Site contamination that exists in and along the Columbia River. (authors)

  20. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits, Area 5 Waste Management Division, Nevada National Security Site, Final CQA Report

    International Nuclear Information System (INIS)

    2012-01-01

    The report is the Final Construction Quality Assurance (CQA) Report for the 92-Acrew Evapotranspiration Cover, Area 5 Waste Management Division Retired Mixed Waste Pits, Nevada National Security Site, Nevada, for the period of January 20, 2011, to January 31, 2012 The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.

  1. Corrective Action Investigation Plan for Corrective Action Unit 234: Mud Pits, Cellars, and Mud Spills, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Grant Evenson

    2007-01-01

    Corrective Action Unit 234, Mud Pits, Cellars, and Mud Spills, consists of 12 inactive sites located in the north and northeast section of the NTS. The 12 CAU 234 sites consist of mud pits, mud spills, mud sumps, and an open post-test cellar. The CAU 234 sites were all used to support nuclear testing conducted in the Yucca Flat and Rainier Mesa areas during the 1950s through the 1970s. The CASs in CAU 234 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting appropriate corrective action alternatives

  2. INEL cold test pit demonstration of improvements in information derived from non-intrusive geophysical methods over buried waste sites

    International Nuclear Information System (INIS)

    1993-01-01

    The objectives of this research project were to lay the foundation for further improvement in the use of geophysical methods for detection of buried wastes, and to increase the information content derived from surveys. Also, an important goal was to move from mere detection to characterization of buried wastes. The technical approach to achieve these objectives consisted of: (1) Collect a data set of high spatial density; (2) Acquire data with multiple sensors and integrate the interpretations inferred from the various sensors; (3) Test a simplified time domain electromagnetic system; and (4) Develop imaging and display formats of geophysical data readily understood by environmental scientists and engineers. The breadth of application of this work is far reaching. Not only are uncontrolled waste pits and trenches, abandoned underground storage tanks, and pipelines found throughout most US DOE facilities, but also at military installations and industrial facilities. Moreover, controlled land disposal sites may contain ''hot spots'' where drums and hazardous material may have been buried. The technologies addressed by the R ampersand D will benefit all of these activities

  3. Savannah River Site radioiodine atmospheric releases and offsite maximum doses

    International Nuclear Information System (INIS)

    Marter, W.L.

    1990-01-01

    Radioisotopes of iodine have been released to the atmosphere from the Savannah River Site since 1955. The releases, mostly from the 200-F and 200-H Chemical Separations areas, consist of the isotopes, I-129 and 1-131. Small amounts of 1-131 and 1-133 have also been released from reactor facilities and the Savannah River Laboratory. This reference memorandum was issued to summarize our current knowledge of releases of radioiodines and resultant maximum offsite doses. This memorandum supplements the reference memorandum by providing more detailed supporting technical information. Doses reported in this memorandum from consumption of the milk containing the highest I-131 concentration following the 1961 1-131 release incident are about 1% higher than reported in the reference memorandum. This is the result of using unrounded 1-131 concentrations of I-131 in milk in this memo. It is emphasized here that this technical report does not constitute a dose reconstruction in the same sense as the dose reconstruction effort currently underway at Hanford. This report uses existing published data for radioiodine releases and existing transport and dosimetry models

  4. Superfund record of decision (EPA Region 4): Whitehouse Waste Oil Pits Site, Duval County, Jacksonville, FL. (First remedial action), (Amendment), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Whitehouse Waste Oil Pits site was used by Allied Petroleum Products (Allied) to dispose of acidic waste oil sludges from its oil reclamation process in Whitehouse, Duval County, Florida. A cypress swamp system and residential area are immediately adjacent to the site. The acid sludge produced in the first step and clay used to decolorize the oil were dumped into the unlined pits at the site. A 1985 ROD addressed source control as a containment remedy consisting of a slurry wall construction, soil cap, and a ground water recovery and treatment system; however, EPA has re-evaluated the 1985 ROD selection and determined that the containment remedy failed to meet the requirements of SARA. As a result, the ROD Amendment focuses on an alternative for treating Whitehouse wastes by eliminating direct contact risk associated with pit soil/sludge wastes and preventing contaminated ground water in the surficial aquifer from migrating laterally. The primary contaminants of concern that affect the soil, sediment, surface water, and ground water are VOCs, including benzene, toluene, and xylenes; organics, including PCBs and phenols; and metals, including arsenic, chromium, and lead. The amended remedial action for the site are included

  5. Closure report for CAU No. 450: Historical UST release sites, Nevada Test Site. Volume 2

    International Nuclear Information System (INIS)

    1997-09-01

    This report addresses the closure of 11 historical underground storage tank release sites within various areas of the Nevada Test Site. This report contains remedial verification of the soil sample analytical results for the following: Area 11 Tweezer facility; Area 12 boiler house; Area 12 service station; Area 23 bypass yard; Area 23 service station; Area 25 power house; Area 25 tech. services building; Area 25 tech. operations building; Area 26 power house; and Area 27 boiler house

  6. Closure Report for Corrective Action Units 530, 531, 532, 533, 534, 535: NTS Mud Pits, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-07-01

    This Closure Report (CR) presents information supporting the recommendation of no further action for the following six Corrective Action Units (CAUs): (1) CAU 530 - LANL Preshot Mud Pits; (2) CAU 531 - LANL Postshot Mud Pits; (3) CAU 532 - LLNL Preshot Mud Pits; (4) CAU 533 - LLNL Postshot Mud Pits; (5) CAU 534 - Exploratory/Instrumentation Mud Pits; and (6) CAU 535 - Mud Pits/Disposal Areas. This CR complies with the requirements of the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. CAUs 530-535 are located in Areas 1-10, 14, 17, 19, and 20 of the Nevada Test Site and are comprised of 268 Corrective Action Sites (CASs) listed in Table 1-1. The purpose of this CR is to validate the risk-based closure strategy presented in the ''Mud Pit Risk-Based Closure Strategy Report'' (RBCSR) (NNSA/NSO, 2004) and the CAUs 530-535 SAFER Plan (NNSA/NSO, 2005b). This strategy uses 52 CASs as a statistical representation of CAUs 530-535 to confirm the proposed closure alternative, no further action, is sufficient to protect human health and the environment. This was accomplished with the following activities: A field investigation following a probabilistic sampling design to collect data that were used in a non-carcinogenic risk assessment for human receptors; Visual habitat surveys to confirm the lack of habitat for threatened and endangered species; Disposal of debris and waste generated during field activities; and Document Notice of Completion and closure of CAUs 530-535 issued by Nevada Division of Environmental Protection. The field investigation and site visits were conducted between August 31, 2005 and February 21, 2006. As stated in the RBCSR and Streamlined Approach for Environmental Restoration (SAFER) Plan, total petroleum hydrocarbons-diesel-range organics (TPH-DRO) was the only contaminant of potential

  7. Corrective Action Investigation Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada, July 2002, Rev. No. 0

    International Nuclear Information System (INIS)

    2002-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located within Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive residues

  8. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2006-01-01

    This report provides a summary and analysis of visual site inspections and soil gas sampling results for Corrective Action Unit (CAU) 342, Area 23 Mercury Fire Training Pit. CAU 342 is identified in the Federal Facility Agreement and Consent Order of 1996 and consists of Corrective Action Site 23-56-01, Former Mercury Fire Training Pit. This report covers calendar years 2004 and 2005. Visual site inspections were conducted on May 20 and November 14, 2004, and May 17 and November 15, 2005. No significant findings were observed during these inspections. The site was in good condition, and no repair activities were required. Soil gas samples were collected on November 29, 2005, for analysis of volatile organic compounds (VOCs) and semivolatile organic compounds (SVOCs), and samples were collected on December 1, 2005, for analysis of base gases. Base gas concentrations in the monitoring well show a high concentration of carbon dioxide and a low concentration of oxygen, which is an indication of biodegradation of total petroleum hydrocarbons (TPH) in the soil. Results for VOCs and SVOCs are unchanged, with VOCs below or near laboratory method detection limits and no SVOCs detected above laboratory method detection limits. Post-closure monitoring was required for six years after closure of the site. Therefore, since 2005 was the sixth year of monitoring, the effectiveness of natural attenuation of the TPH-impacted soil by biodegradation was evaluated. The base gas concentrations indicate that biodegradation of TPH in the soil is occurring; therefore, it is recommended that monitoring be discontinued. Visual site inspections should continue to be performed biannually to ensure that the signs are in place and readable and that the use restriction has been maintained. The results of the site inspections will be documented in a letter report and submitted annually

  9. Corrective Action Decision Document for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada, Revision 1 with ROTC 1

    International Nuclear Information System (INIS)

    Boehlecke, Robert

    2004-01-01

    This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site (NTS), Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 140 is located within Areas 5, 22, and 23 of the NTS and is comprised of the following corrective action sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; and 23-17-01, Hazardous Waste Storage Area. The purpose of this CADD is to identify and provide a rationale for the recommendation of a corrective action alternative for each CAS within CAU 140. Corrective action investigation activities were performed from November 13 through December 11, 2002. Additional sampling to delineate the extent of contaminants of concern (COCs) was conducted on February 4 and March 18 and 19, 2003. Corrective action investigation activities were performed as set forth in the Corrective Action Investigation Plan for CAU 140. Analytes detected during the corrective action investigation were evaluated against appropriate preliminary action levels to identify COCs for each CAS. Assessment of the data generated from investigation activities revealed the following: (1) CAS 05-08-01 contains the COCs lead and the radioisotope thorium-234 in the surface soil at sample location A05. (2) CAS 05-23-01 did not have any COCs identified during the field investigation; however, based on historical knowledge of activities at this site, the interior of the Gravel Gertie is considered contaminated with uranium. (3) CAS 23-17-01 contains the COC total petroleum hydrocarbons (diesel-range organics) at location J20 at a depth of 9 to 10 feet below ground surface. (4) No COCs were identified at CASs 05-08-02, 05-17-01, 05-19-01, 05

  10. INEL cold test pit demonstration of improvements in information derived from non-intrusive geophysical methods over buried waste sites

    International Nuclear Information System (INIS)

    1994-01-01

    Under contract between US DOE Idaho National Engineering Laboratory (INEL) and the Blackhawk Geosciences Division of Coleman Research Corporation (BGD-CRC), geophysical investigations were conducted to improve the detection of buried wastes. Over the Cold Test Pit (CTP) at INEL, data were acquired with multiple sensors on a dense grid. Over the CTP the interpretations inferred from geophysical data are compared with the known placement of various waste forms in the pit. The geophysical sensors employed were magnetics, frequency and time domain electromagnetics, and ground penetrating radar. Also, because of the high data density acquired, filtering and other data processing and imaging techniques were tested. After completion and analysis of the survey and interpretation over the CTP, the second phase of investigation consisted of testing geophysical methods over the Idaho Chemical Processing Plant (ICPP). The sections of the ICPP surveyed are underlain by a complex network of buried utility lines of different dimensions and composition, and with placement at various depths up to 13 ft. Further complications included many metallic objects at the surface, such as buildings, reinforced concrete pads, and debris. Although the multiple geophysical sensor approach mapped many buried utilities, they mapped far from all utilities shown on the facility drawings. This report consists of data collected from these geophysical surveys over the ICPP

  11. Optic Nerve Pit

    Science.gov (United States)

    ... Conditions Frequently Asked Questions Español Condiciones Chinese Conditions Optic Nerve Pit What is optic nerve pit? An optic nerve pit is a ... may be seen in both eyes. How is optic pit diagnosed? If the pit is not affecting ...

  12. Applied field test procedures on petroleum release sites

    International Nuclear Information System (INIS)

    Gilbert, G.; Nichols, L.

    1995-01-01

    The effective remediation of petroleum contaminated soils and ground water is a significant issue for Williams Pipe Line Co. (Williams): costing $6.8 million in 1994. It is in the best interest, then, for Williams to adopt approaches and apply technologies that will be both cost-effective and comply with regulations. Williams has found the use of soil vapor extraction (SVE) and air sparging (AS) field test procedures at the onset of a petroleum release investigation/remediation accomplish these goals. This paper focuses on the application of AS/SVE as the preferred technology to a specific type of remediation: refined petroleum products. In situ field tests are used prior to designing a full-scale remedial system to first validate or disprove initial assumptions on applicability of the technology. During the field test, remedial system design parameters are also collected to tailor the design and operation of a full-scale system to site specific conditions: minimizing cost and optimizing effectiveness. In situ field tests should be designed and operated to simulate as close as possible the operation of a full-scale remedial system. The procedures of an in situ field test will be presented. The results of numerous field tests and the associated costs will also be evaluated and compared to full-scale remedial systems and total project costs to demonstrate overall effectiveness. There are many advantages of As/SVE technologies over conventional fluid extraction or SVE systems alone. However, the primary advantage is the ability to simultaneously reduce volatile and biodegradable compound concentrations in the phreatic, capillary fringe, and unsaturated zones

  13. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  14. Iodine-131 releases from the Hanford Site, 1944--1947

    International Nuclear Information System (INIS)

    Heeb, C.M.

    1992-10-01

    Detailed results of the Hanford Environmental Dose Reconstruction (HEDR) iodine-131 release reconstruction are presented in this volume. Included are daily data on B, D, and F Plant, reactor operations from the P-Department Daily Reports (General Electric Company 1947). Tables of B and T Plant material processed from the three principal sources on separations plant operations: The Jaech report (Jaech undated), the 200 Area Report (Acken and Bird 1945; Bird and Donihee 1945), and the Metal History Reports (General Electric Company 1946). A transcription of the Jaech report is also provided because it is computer-generated and is not readily readable in its original format. The iodine-131 release data are from the STRM model. Cut-by-cut release estimates are provided, along with daily, monthly, and yearly summations. These summations are based on the hourly release estimates. The hourly data are contained in a 28 megabyte electronic file. Interested individuals may request a copy

  15. Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    C. M. Obi

    2000-05-01

    The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditch flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.

  16. Bingham Pump Outage Pits: Environmental information document

    International Nuclear Information System (INIS)

    Pekkala, R.O.; Jewell, C.E.; Holmes, W.G.; Marine, I.W.

    1987-03-01

    Seven waste sites known as the Bingham Pump Outage Pits located in areas of the Savannah River Plant (SRP) received solid waste containing an estimated 4 Ci of low-level radioactivity in 1957-1958. These sites were subsequently backfilled and have been inactive since that time. Most of the radioactivity at the Bingham Pump Outage Pits has been eliminated by radioactive decay. A total of approximately 1 Ci of activity (primarily 137 Cs and 90 Sr) is estimated to remain at the seven sites. The closure options considered for the Bingham Pump Outage Pits are waste removal and closure, no waste removal and closure, and no action. The predominant pathways for human exposure to chemical and/or radioactive constituents are through surface, subsurface, and atmospheric transport. Modeling calculations were made to determine the risks to human population via these general pathways for the three postulated closure options. An ecological assessment was conducted to predict the environmental impacts on aquatic and terrestrial biota. The relative costs for each of the closure options were estimated. Evaluation indicates that the relative human health risks for all closure options are small. The greatest public risk would occur after the waste site was released to unrestricted public use (assumed to occur in Year 2085) via the groundwater pathway to a well. The cost estimates show that the waste removal and closure option is the most expensive (89.6 million dollars). The cost of the no waste removal and the no action options is $800,000. 35 refs., 26 figs., 47 tabs

  17. Burn Pits

    Science.gov (United States)

    ... Accountability & Whistleblower Protection Transparency Media Room Inside the Media Room Public Affairs News Releases Speeches Videos Publications National Observances Veterans Day Memorial Day Celebrating America's Freedoms Special Events Adaptive Sports Program Creative Arts Festival ...

  18. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): (sm b ullet) CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536 Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure

  19. 2004 Toxic Release Inventory Sites in Louisiana, Geographic NAD83, EPA (2006) [toxic_release_inventory_site_LA_EPA_2004

    Data.gov (United States)

    Louisiana Geographic Information Center — Data extracted from the EPA Toxics Release Inventory (TRI) system for reporting year 2004. The dataset contains facility identification, submitted and/or preferred...

  20. Water-Level Reconstruction and its Implications for Late Pleistocene Paleontological Site Formation in Hoyo Negro, a Submerged Subterranean Pit in Quintana Roo, Mexico

    Science.gov (United States)

    Rissolo, D.; Reinhardt, E. G.; Collins, S.; Kovacs, S. E.; Beddows, P. A.; Chatters, J. C.; Nava Blank, A.; Luna Erreguerena, P.

    2014-12-01

    A massive pit deep within the now submerged cave system of Sac Actun, located along the central east coast of the Yucatan Peninsula, contains a diverse fossil assemblage of extinct megafauna as well as a nearly complete human skeleton. The inundated site of Hoyo Negro presents a unique and promising opportunity for interdisciplinary Paleoamerican and paleoenvironmental research in the region. Investigations have thus far revealed a range of associated features and deposits which make possible a multi-proxy approach to identifying and reconstructing the natural and cultural processes that have formed and transformed the site over millennia. Understanding water-level fluctuations (both related to, and independent from, eustatic sea level changes), with respect to cave morphology is central to understanding the movement of humans and animals into and through the cave system. Recent and ongoing studies involve absolute dating of human, faunal, macrobotanical, and geological samples; taphonomic analyses; and a characterization of site hydrogeology and sedimentological facies, including microfossil assemblages and calcite raft deposits.

  1. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

  2. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2012-01-01

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 (as amended March 2010)). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

  3. Modelling of contaminant release from a uranium mine tailings site

    International Nuclear Information System (INIS)

    Kahnt, Rene; Metschies, Thomas

    2007-01-01

    Available in abstract form only. Full text of publication follows: Uranium mining and milling continuing from the early 1960's until 1990 close to the town of Seelingstaedt in Eastern Germany resulted in 4 tailings impoundments with a total tailings volume of about 105 Mio. m 3 . Leakage from these tailings impoundments enters the underlying aquifers and is discharged into surface water streams. High concentration of salts, uranium and several heavy metals are released from the tailings. At present the tailings impoundments are reshaped and covered. For the identification of suitable remediation options predictions of the contaminant release for different remediation scenarios have to be made. A compartment model representing the tailings impoundments and the surrounding aquifers for the calculation of contaminant release and transport was set up using the software GOLDSIM. This compartment model describes the time dependent hydraulic conditions within the tailings and the surrounding aquifers taking into account hydraulic and geotechnical processes influencing the hydraulic properties of the tailings material. A simple geochemical approach taking into account sorption processes as well as retardation by applying a k d -approach was implemented to describe the contaminant release and transport within the hydraulic system. For uranium as the relevant contaminant the simple approach takes into account additional geochemical conditions influencing the mobility. Alternatively the model approach allows to include the results of detailed geochemical modelling of the individual tailings zones which is than used as source term for the modelling of the contaminant transport in the aquifer and to the receiving streams. (authors)

  4. Corrective Action Decision Document for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada: Revision No. 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-10-17

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative appropriate to facilitate the closure of Corrective Action Unit (CAU) 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Areas 5, 22, and 23 of the NTS, CAU 140 consists of nine corrective action sites (CASs). Investigation activities were performed from November 13 through December 11, 2002, with additional sampling to delineate the extent of contaminants of concern (COCs) conducted on February 4 and March 18 and 19, 2003. Results obtained from the investigation activities and sampling indicated that only 3 of the 9 CASs at CAU 140 had COCs identified. Following a review of existing data, future land use, and current operations at the NTS, the following preferred alternatives were developed for consideration: (1) No Further Action - six CASs (05-08-02, 05-17-01, 05-19-01, 05-35-01, 05-99-04, and 22-99-04); (2) Clean Closure - one CAS (05-08-01), and (3) Closure-in-Place - two CASs (05-23-01 and 23-17-01). These alternatives were judged to meet all requirements for the technical components evaluated. Additionally, the alternatives meet all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated media at CAU 140.

  5. Aquifer Characteristics Data Report for the Weldon Spring Site chemical plant/raffinate pits and vicinity properties for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-11-01

    This report describes the procedures and methods used, and presents the results of physical testing performed, to characterize the hydraulic properties of the shallow Mississippian-Devonian aquifer beneath the Weldon Spring chemical plant, raffinate pits, and vicinity properties. The aquifer of concern is composed of saturated rocks of the Burlington-Keokuk Limestone which constitutes the upper portion of the Mississippian-Devonian aquifer. This aquifer is a heterogeneous anisotropic medium which can be described in terms of diffuse Darcian flow overlain by high porosity discrete flow zones and conduits. Average hydraulic conductivity for all wells tested is 9.6E-02 meters/day (3.1E-01 feet/day). High hydraulic conductivity values are representative of discrete flow in the fractured and weathered zones in the upper Burlington-Keokuk Limestone. They indicate heterogeneities within the Mississippian-Devonian aquifer. Aquifer heterogeneity in the horizontal plane is believed to be randomly distributed and is a function of fracture spacing, solution voids, and preglacial weathering phenomena. Relatively high hydraulic conductivities in deeper portions of the aquifer are though to be due to the presence of widely spaced fractures. 44 refs., 27 figs., 9 tabs

  6. Savannah River Site Ingestion Pathway Methodology Manual for Airborne Radioactive Releases

    Energy Technology Data Exchange (ETDEWEB)

    Vincent, A.W. III

    2001-01-03

    This manual documents a recommended methodology for determining the ingestion pathway consequences of hypothetical accidental airborne radiological releases from facilities at the Savannah River Site. Both particulate and tritiated radioactive contaminants are addressed. Other approaches should be applied for evaluation of routine releases.

  7. Minutes of the workshop on off-site release criteria for contaminated materials

    International Nuclear Information System (INIS)

    Singh, S.P.N.

    1989-11-01

    A one and one-half-day workshop was held May 2-3, 1989, at the Pollard Auditorium in Oak Ridge, Tennessee, with the objective of formulating a strategy for developing reasonable and uniform criteria for releasing radioactively contaminated materials from the US Department of Energy (DOE) sites. This report contains the minutes of the workshop. At the conclusion of the workshop, a plan was formulated to facilitate the development of the above-mentioned off-site release criteria

  8. Metallography of pitted aluminum-clad, depleted uranium fuel

    International Nuclear Information System (INIS)

    Nelson, D.Z.; Howell, J.P.

    1994-01-01

    The storage of aluminum-clad fuel and target materials in the L-Disassembly Basin at the Savannah River Site for more than 5 years has resulted in extensive pitting corrosion of these materials. In many cases the pitting corrosion of the aluminum clad has penetrated in the uranium metal core, resulting in the release of plutonium, uranium, cesium-137, and other fission product activity to the basin water. In an effort to characterize the extent of corrosion of the Mark 31A target slugs, two unirradiated slug assemblies were removed from basin storage and sent to the Savannah River Technology Center for evaluation. This paper presents the results of the metallography and photographic documentation of this evaluation. The metallography confirmed that pitting depths varied, with the deepest pit found to be about 0.12 inches (3.05 nun). Less than 2% of the aluminum cladding was found to be breached resulting in less than 5% of the uranium surface area being affected by corrosion. The overall integrity of the target slug remained intact

  9. Modeling sludge accumulation rates in lined pit latrines in slum ...

    African Journals Online (AJOL)

    Yvonne

    should include geo-physical characterization of soil and drainage of pit latrine sites so as ... Key words: Faecal, sludge accumulation rates, slum areas, lined pit latrines. .... Value and its unit Source .... overall quality of the models had to be assessed by validation on ..... Sanitation partnership series: Bringing pit emptying out.

  10. Pit Water Storage Ottrupgaard

    DEFF Research Database (Denmark)

    Heller, Alfred

    2000-01-01

    The pit water storage, a seasonal thermal storage, was built in 1993 with floating lid and hybrid clay-polymer for pit lining. The storage was leaking severe and solutions were to be found. In the paper solutions for pit lining and floating lids are discussed, cost estimations given and coming...

  11. Meteorological conditions at the release site during the two tracer experiments

    DEFF Research Database (Denmark)

    Gryning, Sven-Erik; Batchvarova, E.; Schneiter, D.

    1998-01-01

    The state of the boundary layer at the release site during the two tracer experiments is described, based on measurements of atmospheric turbulence carried our by a sonic anemometer, profiles of horizontal and vertical wind by a SODAR as well as frequent radiosonde releases. The boundary layer...... height is derived from radiosoundings, modelled and discussed. The study is meant as background for discussions of the tracer behaviour near the release site, and possible influence of the local meteorology at the release site on the long-range dispersion. The difference in the initial mese...... model development. It is concluded that the micrometeorological measurements are very important as background information for the understanding of plume behaviour on small as well as long scales. (C) 1998 Elsevier Science Ltd. All rights reserved....

  12. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient information and process

  13. A survey of domestic wells and pit latrines in rural settlements of Mali: Implications of on-site sanitation on the quality of water supplies.

    Science.gov (United States)

    Martínez-Santos, P; Martín-Loeches, M; García-Castro, N; Solera, D; Díaz-Alcaide, S; Montero, E; García-Rincón, J

    2017-10-01

    On-site sanitation is generally advocated as a means to eradicate the health hazards associated with open defecation. While this has provided a welcome upgrade to the livelihoods of millions of people in low-income countries, improved sanitation facilities are increasingly becoming a threat to domestic groundwater-based supplies. Within this context, a survey of pit latrines, domestic wells and improved water sources was carried out in a large rural village of southern Mali. All households were surveyed for water, sanitation and hygiene habits. Domestic wells and improved water sources were georeferenced and sampled for water quality (pH, electric conductivity, temperature, turbidity, total dissolved solids, thermotolerant coliforms, chloride and nitrate) and groundwater level, while all latrines were inspected and georeferenced. A GIS database was then used to evaluate the proportion of water points within the influence area of latrines, as well as to underpin multiple regression models to establish the determinants for fecal contamination in drinking supplies. Moreover, an appraisal of domestic water treatment practices was carried out. This revealed that nearly two-thirds of the population uses bleach to purify drinking supplies, but also that domestic-scale treatment as currently implemented by the population is far from effective. It is thus concluded that existing habits could be enhanced as a means to make water supplies safer. Furthermore, population, well and latrine density were all identified as statistically significant predictors for fecal pollution at different spatial scales. These findings are policy-relevant in the context of groundwater-dependent human settlements, since many countries in the developing world currently pursue the objective of eliminating open defecation. Copyright © 2017 Elsevier GmbH. All rights reserved.

  14. Site-sensitive hazards of potential airborne radioactive release from sources on the Kola peninsula

    International Nuclear Information System (INIS)

    Bergman, R.; Thaning, L.; Baklanov, A.

    1998-02-01

    In this work we focus on cases of airborne releases from some of the sources on the Kola Peninsula - primarily nuclear reactors on submarines and the Kola Nuclear Power Plant (KNPP). The purpose of our study is to illustrate, and discuss some features - dependent on site and release characteristics - of the deposition patterns resulting from assumed unit radioactive releases to the atmosphere from a location at a fjord and from the KNPP in Polyarnye Zori. Using meteorological data for one real weather situation, the analysis is based on simulating the transport in air of assumed radioactive releases and estimating the deposition pattern on local, meso- and regional scales. By allowing unit releases to occur simultaneously from the site at the fjord and from the power plant (and with the same release profile in time) comparisons are made of differences in deposition patterns in and outside the Kola region. In this case study a set of assumed release heights, durations of the release, and particle size distributions are applied to indicate the dependence for the resulting deposition pattern on these parameters

  15. Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1996-03-01

    This document provides an overview of the Savannah River Site (SRS) and a description of the F-Area Burning/Rubble Pits (BRPs) and Rubble Pit (RP) unit. It also describes the objectives and scope of the baseline risk assessment (BRA).

  16. Orientation of pigeons exposed to constant light and released from familiar sites.

    Science.gov (United States)

    Dall'Antonia, P; Luschi, P

    1993-12-01

    It has been proposed that homing pigeons may use pilotage to orient home when released from familiar sites. To test this possibility, a group of pigeons was released from familiar locations after being exposed to a constant bright light. This treatment produced the loss of the circadian rhythmicity of general activity of the birds and thus presumably impaired their time-compensating sun compass mechanism. Experimental birds, both anosmic and olfactorily unimpaired, did not show any tendency to orient home, their bearing distributions being generally not different from random. Their homing performances were also affected. These results show that initial orientation of pigeons released from familiar sites entails the use of the sun compass even when the birds are released after a treatment that makes them arrhythmic in their activity. The possibility that pilotage may play a role in the first part of the homing flight of pigeons remains to be demonstrated.

  17. Population dose commitments due to radioactive releases from nuclear power plant sites in 1986

    International Nuclear Information System (INIS)

    Baker, D.A.

    1989-10-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1986. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 66 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 31 person-rem to a low of 0.0007 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.7 person-rem. The total population dose for all sites was estimated at 110 person-rem for the 140 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 2 x 10 -6 mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. 12 refs

  18. Population dose commitments due to radioactive releases from nuclear power plant sites in 1984

    International Nuclear Information System (INIS)

    Baker, D.A.

    1988-01-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1984. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 56 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 110 person-rem to a low of 0.002 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 5 person-rem. The total population dose for all sites was estimated at 280 person-rem for the 100 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 6 x 10 -6 mrem to a high of 0.04 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  19. Population dose commitments due to radioactive releases from nuclear power plant sites in 1985

    International Nuclear Information System (INIS)

    Baker, D.A.

    1988-08-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commericial power reactors operating during 1985. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 61 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 73 person-rem to a low of 0.011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 200 person-rem for the 110 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 5 /times/ 10/sup /minus/6/ mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  20. Operational experience in mitigating flammable gas releases from Hanford Site Tank 241-SY-101

    International Nuclear Information System (INIS)

    Lentsch, J.W.; Babad, H.; Kirch, N.W.

    1995-01-01

    Flammable gases consisting of hydrogen, nitrous oxide, ammonia, and methane are periodically released from Hanford Site waste tank 241-SY-101 at concentrations above the flammable limit. A large mixer pump installed in the tank in 1993 has effectively mitigated this problem by continuously releasing small amounts of the flammable gases at the rate they are generated. Tank 241-SY-101 is also equipped with multiple high-sensitivity gas monitoring systems and level detection systems to measure the quantity of gas that is retained in and released from the waste

  1. Molecular scaffold reorganization at the transmitter release site with vesicle exocytosis or botulinum toxin C1.

    Science.gov (United States)

    Stanley, Elise F; Reese, Tom S; Wang, Gary Z

    2003-10-01

    Neurotransmitter release sites at the freeze-fractured frog neuromuscular junction are composed of inner and outer paired rows of large membrane particles, the putative calcium channels, anchored by the ribs of an underlying protein scaffold. We analysed the locations of the release site particles as a reflection of the scaffold structure, comparing particle distributions in secreting terminals with those where secretion was blocked with botulinum toxin A, which cleaves a small segment off SNAP-25, or botulinum toxin C1, which cleaves the cytoplasmic domain of syntaxin. In the idle terminal the inner and outer paired rows were located approximately 25 and approximately 44 nm, respectively, from the release site midline. However, adjacent to vesicular fusion sites both particle rows were displaced towards the midline by approximately 25%. The intervals between the particles along each row were examined by a nearest-neighbour approach. In control terminals the peak interval along the inner row was approximately 17 nm, consistent with previous reports and the spacing of the scaffold ribs. While the average distance between particles in the outer row was also approximately 17 nm, a detailed analysis revealed short 'linear clusters' with a approximately 14 nm interval. These clusters were enriched at vesicle fusion sites, suggesting an association with the docking sites, and were eliminated by botulinum C1, but not A. Our findings suggest, first, that the release site scaffold ribs undergo a predictable, and possibly active, shortening during exocytosis and, second, that at the vesicle docking site syntaxin plays a role in the cross-linking of the rib tips to form the vesicle docking sites.

  2. Population dose commitments due to radioactive releases from nuclear power plant sites in 1982. Volume 4

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1986-06-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1982. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 51 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments from both liquid and airborne pathways ranged from a high of 30 person-rem to a low of 0.007 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 130 person-rem for the 100 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 6 x 10 -7 mrem to a high of 0.06 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  3. Waterborne Release Monitoring and Surveillance Programs at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Blanchard, A.

    1999-03-26

    This report documents the liquid release environmental compliance programs currently in place at the Savannah river Site (SRS). Included are descriptions of stream monitoring programs, which measure chemical parameters and radionuclides in site streams and the Savannah river and test representative biological communities within the streams for chemical and radiological uptake. This report also explains the field sampling and analytical capabilities that are available at SRS during both normal and emergency conditions.

  4. Waterborne Release Monitoring and Surveillance Programs at the Savannah River Site

    International Nuclear Information System (INIS)

    Blanchard, A.

    1999-01-01

    This report documents the liquid release environmental compliance programs currently in place at the Savannah river Site (SRS). Included are descriptions of stream monitoring programs, which measure chemical parameters and radionuclides in site streams and the Savannah river and test representative biological communities within the streams for chemical and radiological uptake. This report also explains the field sampling and analytical capabilities that are available at SRS during both normal and emergency conditions

  5. Population dose commitments due to radioactive releases from Nuclear-Power-Plant Sites in 1979

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1982-12-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1979. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 1300 person-rem to a low of 0.0002 person-rem with an arithmetic mean of 38 person-rem. The total population dose for all sites was estimated at 1800 person-rem for the 94 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 2 x 10 - 6 mrem to a high of 0.7 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  6. Population dose commitments due to radioactive releases from nuclear power plant sites in 1987

    International Nuclear Information System (INIS)

    Baker, D.A.

    1990-08-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1987. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 70 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for reach of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The site average individual dose commitment from all pathways ranged from a low of 2 x 10 -6 mrem to a high of 0.009 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year). 2 refs., 2 figs., 7 tabs

  7. Estimating release of polycyclic aromatic hydrocarbons from coal tar at manufactured-gas plant sites

    International Nuclear Information System (INIS)

    Loehr, R.C.; Rao, P.S.C.; Lee, L.S.; Okuda, I.

    1992-08-01

    One component of the EPRI's research on Envirorunental Behavior of Organic Substances (EBOS) consists of developing information and models to predict releases of monocyclic and polycyclic aromatic hydrocarbons (MAHs and PAHs) to groundwater from coal tars and contaminated soils at MGP sites. The results of this report focus primarily on release of PAHs from coal tars. There are at least two approaches to predicting the release of organic chemicals from coal tar to water. The simplest method to estimate aqueous concentrations is to assume that water solubility of a PAH compound released from the tar can be defined by equilibrium precipitation-dissolution reactions. Application of Raoult's law is another method to predict aqueous concentrations, which requires the assumption of ''ideal'' behavior for partitioning of PAHs between the tar and water phases. To evaluate the applicability of these two methods for predicting PAH releases, laboratory experiments were conducted with eight coal tar samples from former MGP sites across the country. Migration of chemicals in the environment and resulting contaminant plumes in groundwater are determined by leachate concentrations of the chemicals. The use of equilibrium precipitation-dissolution reactions will usually result in an overestimation of PAH concentrations in the leachate from a coal tar source, and thus the resulting PAH concentrations in groundwater. Raoult's law appears to be a more accurate approach to predicting the release of several PAHs from coal tars. Furthermore, if nonequilibrium conditions prevail, aqueous-phase PAH concentrations will be even lower than those predicted using Raoult's law

  8. Summary of accidental releases of radioactivity detected off the Nevada Test Site, 1963--1986

    International Nuclear Information System (INIS)

    Patzer, R.G.; Phillips, W.G.; Grossman, R.F.; Black, S.C.; Costa, C.F.

    1988-08-01

    Of the more than 450 underground nuclear explosives tests conducted at the Nevada Test Site from August 1963 (signing of the Limited Test Ban Treaty) through the end of 1986, only 23 accidentally released radioactivity that was detectable beyond the boundary of the NTS. Of these 23, 4 were detectable off the NTS only by aircraft while the remainder were detectable by ground monitoring instruments. Since the Baneberry venting of December 1970, only two tests released radioactivity that was detectable off the NTS, and this was a seepage of radioactive noble gases. None of these releases from underground tests designed for complete containment caused exposure of the population living in the area that exceeded standards recommended by national and international radiation protection agencies. This report summarizes the releases from each of the tests, describes the monitoring that was conducted, and lists the location of the maximum exposure

  9. Population dose commitments due to radioactive releases from nuclear power plant sites in 1988

    International Nuclear Information System (INIS)

    Baker, D.A.

    1992-01-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1988. Fifty-year commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 71 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 16 person-rem to a low of 0.0011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.1 person-rem. The total population dose for all sites was estimated at 75 person-rem for the 150 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 3 x 10 -7 mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year)

  10. Pit Study, Geographic NAD83, LOSCO (1999) [pit_study_LOSCO_1998

    Data.gov (United States)

    Louisiana Geographic Information Center — The 'Pit Study' was meant to identify the remnants of former oil extraction sites which pose the threat of creating an oil spill. These remnants include many other...

  11. Population dose commitments due to radioactive releases from nuclear-power-plant sites in 1978

    International Nuclear Information System (INIS)

    Peloquin, R.A.; Schwab, J.D.; Baker, D.A.

    1982-06-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1978. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 200 person-rem to a low of 0.0004 person-rem with an arithmetic mean of 14 person-rem. The total population dose for allsites was estimated at 660 person-rem for the 93 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 3 x 10 -6 mrem to a high of 0.08 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  12. Population dose commitments due to radioactive releases from nuclear power plant sites in 1975

    International Nuclear Information System (INIS)

    Baker, D.A.; Soldat, J.K.; Watson, E.C.

    1977-10-01

    Population radiation dose commitments were estimated from reported radionuclide releases from commercial power reactors operating during 1975. Fifty-year dose commitments from one year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each site. Results are given in the form of tables giving the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within the 2 to 80-km region around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 750 person-rem to a low of 0.008 person-rem with an arithmetic mean of 34 person-rem

  13. Measured tritium in groundwater related to atmospheric releases from the Marcoule nuclear site

    International Nuclear Information System (INIS)

    Levy, F.; Clech, A.; Crochet, P.

    1996-01-01

    Tritium is released into the atmosphere during normal operation from the industrial facilities operated by COGEMA at Marcoule; over a 1 5-year period covered by this study (1979-1994) the quantities ranged from 4940 to 520 TBq·yr -1 . Atmospheric release in rainy weather results in tritium migration into the ground water by a series of mechanisms associated with the water cycle. COGEMA monitors the ground water by means of bore holes. Atmospheric monitoring is also routinely performed; data on the tritium activity concentration in the air and rainwater are available for the same time period. A simplified observation suggests a relation between the atmospheric tritium release and the ground water radioactivity. In 1994, the activity ranged from 100 to 200 Bq·l -1 in the boreholes located 1 km and 2 km downwind from the point of release, diminishing with the distance to less than 20 Bq·l -1 at about 3 km. The authors attempted to model two types of transfers: atmospheric transfer from the release chimney to the borehole, and transfer in the alluvial ground water. The aquifer comprises the alluvial deposits forming the Codolet plain extending to the south of Marcoule, downwind from the point of atmospheric tritium release. The hydrogeology of the entire Marcoule site has been described in previous studies by the French bureau of geological and mineralogical research (BRGM) and ANTEA. (author)

  14. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation

  15. Dose commitments due to radioactive releases from nuclear power plant sites in 1992. Volume 14

    International Nuclear Information System (INIS)

    Aaberg, R.L.; Baker, D.A.

    1996-03-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1992. Fifty-year dose commitments for a 1-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager, and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses, which are compared with 10 CFR Part 50, Appendix I, design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 3.7 person-rem to a low of 0.0015 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 0.66 person-rem. The total population dose for all sites was estimated at 47 person-rem for the 130-million people considered at risk. The individual dose commitments estimated for all sites were below the 10 CFR 50, Appendix I, design objectives

  16. Dose commitments due to radioactive releases from nuclear power plant sites in 1991. Volume 13

    Energy Technology Data Exchange (ETDEWEB)

    Baker, D.A. [Pacific Northwest Lab., Richland, WA (United States)

    1995-04-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1991. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix 1 design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 22 person-rem to a low of 0.002 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 88 person-rem for the 130 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix 1 design objectives.

  17. Dose commitments due to radioactive releases from nuclear power plant sites in 1992. Volume 14

    Energy Technology Data Exchange (ETDEWEB)

    Aaberg, R.L.; Baker, D.A.

    1996-03-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1992. Fifty-year dose commitments for a 1-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager, and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses, which are compared with 10 CFR Part 50, Appendix I, design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 3.7 person-rem to a low of 0.0015 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 0.66 person-rem. The total population dose for all sites was estimated at 47 person-rem for the 130-million people considered at risk. The individual dose commitments estimated for all sites were below the 10 CFR 50, Appendix I, design objectives.

  18. Dose commitments due to radioactive releases from nuclear power plant sites in 1991. Volume 13

    International Nuclear Information System (INIS)

    Baker, D.A.

    1995-04-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1991. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix 1 design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 22 person-rem to a low of 0.002 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 88 person-rem for the 130 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix 1 design objectives

  19. Population dose commitments due to radioactive releases from nuclear power plant sites in 1983

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1987-04-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1983. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 52 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 45 person-rem to a low of 0.002 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 170 person-rem for the 100 million people considered at risk

  20. Dose commitments due to radioactive releases from nuclear power plant sites in 1989

    International Nuclear Information System (INIS)

    Baker, D.A.

    1993-02-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1989. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix I design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 14 person-rem to a low of 0.005 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 84 person-rem for the 140 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix I design objectives

  1. Dose commitments due to radioactive releases from nuclear power plant sites in 1989

    Energy Technology Data Exchange (ETDEWEB)

    Baker, D.A. (Pacific Northwest Lab., Richland, WA (United States))

    1993-02-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1989. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix I design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 14 person-rem to a low of 0.005 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 84 person-rem for the 140 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix I design objectives.

  2. Dose commitments due to radioactive releases from nuclear power plant sites in 1990: Volume 12

    International Nuclear Information System (INIS)

    Baker, D.A.

    1994-11-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1990. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix 1 design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 15 person-rem to a low of 0.002 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.1 person-rem. The total population dose for all sites was estimated at 78 person-rem for the 130 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix 1 design objectives

  3. Impairment of Release Site Clearance within the Active Zone by Reduced SCAMP5 Expression Causes Short-Term Depression of Synaptic Release

    Directory of Open Access Journals (Sweden)

    Daehun Park

    2018-03-01

    Full Text Available Summary: Despite being a highly enriched synaptic vesicle (SV protein and a candidate gene for autism, the physiological function of SCAMP5 remains mostly enigmatic. Here, using optical imaging and electrophysiological experiments, we demonstrate that SCAMP5 plays a critical role in release site clearance at the active zone. Truncation analysis revealed that the 2/3 loop domain of SCAMP5 directly interacts with adaptor protein 2, and this interaction is critical for its role in release site clearance. Knockdown (KD of SCAMP5 exhibited pronounced synaptic depression accompanied by a slower recovery of the SV pool. Moreover, it induced a strong frequency-dependent short-term depression of synaptic release, even under the condition of sufficient release-ready SVs. Super-resolution microscopy further proved the defects in SV protein clearance induced by KD. Thus, reduced expression of SCAMP5 may impair the efficiency of SV clearance at the active zone, and this might relate to the synaptic dysfunction observed in autism. : Park et al. show that SCAMP5 plays an important role in release site clearance during intense neuronal activity. Loss of SCAMP5 results in a traffic jam at release sites, causing aberrant short-term synaptic depression that might be associated with the synaptic dysfunction observed in autism. Keywords: secretory carrier membrane protein, SCAMP5, autism spectrum disorder, adaptor protein 2, release site clearance, presynaptic active zone, short-term depression, endocytosis, super-resolution microscopy

  4. Life cycle of petroleum biodegradation metabolite plumes, and implications for risk management at fuel release sites.

    Science.gov (United States)

    Zemo, Dawn A; O'Reilly, Kirk T; Mohler, Rachel E; Magaw, Renae I; Espino Devine, Catalina; Ahn, Sungwoo; Tiwary, Asheesh K

    2017-07-01

    This paper summarizes the results of a 5-y research study of the nature and toxicity of petroleum biodegradation metabolites in groundwater at fuel release sites that are quantified as diesel-range "Total Petroleum Hydrocarbons" (TPH; also known as TPHd, diesel-range organics (DRO), etc.), unless a silica gel cleanup (SGC) step is used on the sample extract prior to the TPH analysis. This issue is important for site risk management in regulatory jurisdictions that use TPH as a metric; the presence of these metabolites may preclude site closure even if all other factors can be considered "low-risk." Previous work has shown that up to 100% of the extractable organics in groundwater at petroleum release sites can be biodegradation metabolites. The metabolites can be separated from the hydrocarbons by incorporating an SGC step; however, regulatory agency acceptance of SGC has been inconsistent because of questions about the nature and toxicity of the metabolites. The present study was conducted to answer these specific questions. Groundwater samples collected from source and downgradient wells at fuel release sites were extracted and subjected to targeted gas chromatography-mass spectrometry (GC-MS) and nontargeted two-dimensional gas chromatography with time-of-flight mass spectrometry (GC×GC-MS) analyses, and the metabolites identified in each sample were classified according to molecular structural classes and assigned an oral reference dose (RfD)-based toxicity ranking. Our work demonstrates that the metabolites identified in groundwater at biodegrading fuel release sites are in classes ranked as low toxicity to humans and are not expected to pose significant risk to human health. The identified metabolites naturally attenuate in a predictable manner, with an overall trend to an increasingly higher proportion of organic acids and esters, and a lower human toxicity profile, and a life cycle that is consistent with the low-risk natural attenuation paradigm adopted

  5. Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

    Energy Technology Data Exchange (ETDEWEB)

    Lerch, J.A.; Hulstrom, L.C. [Washington Closure Hanford, LLC, Richland, Washington 99354 (United States); Sands, J.P. [U.S Department of Energy, Richland Operations Office, Richland, Washington 99352 (United States)

    2013-07-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation

  6. Population dose commitments due to radioactive releases from nuclear power plant sites in 1980

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1983-08-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1980. In addition doses derived from the shutdown reactors at the Three Mile Island site were included. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 40 person-rem to a low of 0.02 person-rem with an arithmetic mean of 4 person-rem. The total population dose for all sites was estimated at 180 person-rem for the 96 million people considered at risk

  7. Population dose commitments due to radioactive releases from nuclear power plant sites in 1981. Volume 3

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1985-01-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1981. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways from 48 sites ranged from a high of 20 person-rem to a low of 0.008 person-rem with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 160 person-rem for the 98 million people considered at risk

  8. The influence of site on the impact of radionuclides released into the marine environment

    International Nuclear Information System (INIS)

    Lochard, J.; Maccia, C.; Pages, P.

    1981-01-01

    The potential health impact of releases into the sea from a nuclear facility in normal operation is evaluated in two stages. First the concentration in sea water is determined by means of an area dispersion model which makes it possible to calculate the contamination of marine products (fish, crustaceans and molluscs) in the various areas. Then allowance is made for exchanges between the fishing zones and the regions where the products are consumed in order to estimate the collective radiological detriment on the regional level. The dispersion model was first applied to releases of 137 Cs which occurred during the 1969-1976 period in areas of the eastern English Channel and the eastern Irish Sea. Good agreement is observed with the measurements performed in 1976. The significance of site parameters is then demonstrated by comparing the evolution of concentrations after unit releases of 137 Cs and 239 Pu spread over one year. Depending on the radionuclide and the area where the release takes place, preponderant dilution effects (exchanges between areas) and/or sedimentation effects are observed. After presenting the method of calculating ingested activities, the main results for France are given, showing the impact of 137 Cs releases from a nuclear power station using Pressurized Water Reactors (4x1300 MW(e)) over a period of one year. (author)

  9. Development of criteria for release of Idaho National Engineering Laboratory sites following decontamination and decommissioning

    International Nuclear Information System (INIS)

    Kirol, L.

    1986-08-01

    Criteria have been developed for release of Idaho National Engineering Laboratory (INEL) facilities and land areas following decontamination and decommissioning (D and D). Although these facilities and land areas are not currently being returned to the public domain, and no plans exist for doing so, criteria suitable for unrestricted release to the public were desired. Midway through this study, the implementation of Department of Energy (DOE) Order 5820.2, Radioactive Waste Management, required development of site specific release criteria for use on D and D projects. These criteria will help prevent remedial actions from being required if INEL reuse considerations change in the future. Development of criteria for release of INEL facilities following D and D comprised four study areas: pathways analysis, dose and concentration guidelines, sampling and instrumentation, and implementation procedures. Because of the complex and sensitive nature of the first three categories, a thorough review by experts in those respective fields was desired. Input and support in preparing or reviewing each part of the criteria development task was solicited from several DOE field offices. Experts were identified and contracted to assist in preparing portions of the release criteria, or to serve on a peer-review committee. Thus, the entire release criteria development task was thoroughly reviewed by recognized experts from contractors at several DOE field offices, to validate technical content of the document. Each of the above four study areas was developed originally as an individual task, and a report was generated from each. These reports are combined here to form this document. This release criteria document includes INEL-specific pathways analysis, instrumentation requirements, sampling procedures, the basis for selection of dose and concentration guidelines, and cost-risk-benefit procedures

  10. Development of software tools for supporting building clearance and site release at UKAEA

    International Nuclear Information System (INIS)

    Jessop, G.; Pearl, M.

    2002-01-01

    UKAEA sites generally have complex histories and have been subject to a diverse range of nuclear operations. Most of the nuclear reactors, laboratories, workshops and other support facilities are now redundant and a programme of decommissioning works in accordance with IAEA guidance is in progress. Decommissioning is being carried out in phases with post- operative activities, care and maintenance and care and surveillance periods between stages to allow relatively short-lived radioactivity to decay. This reduces dose levels to personnel and minimises radioactive waste production. Following on from these stages is an end point phase which corresponds to the point at which the risks to human health and the environment are sufficiently low so that the buildings / land can be released for future use. Unconditional release corresponds to meeting the requirement for 'de-licensing'. Although reaching a de-licensable end point is the desired aim for UKAEA sites, it is recognised that this may take hundreds of years for parts of some UKAEA sites, or may never be attainable at a reasonable cost to the UK taxpayer. Thus on these sites, long term risk management systems are in place to minimise the impact on health, safety and the environment. In order to manage these short, medium and long term liabilities, UKAEA has developed a number of software tools based on good practice guidance. One of these tools in particular is being developed to address building clearance and site release. This tool, IMAGES (Information Management and Geographical Information System) integrates systematic data capture, with database management and spatial assessment (through a Geographical Information System). Details of IMAGES and its applications are discussed in the paper. This paper outlines the approach being adopted by UKAEA for building and site release and the integrated software system, IMAGES, being used to capture, collate, interpret and report results. The key to UKAEA's strategy for

  11. Contaminant Release from Residual Waste in Single Shell Tanks at the Hanford Site, Washington, USA - 9276

    International Nuclear Information System (INIS)

    Cantrell, Kirk J.; Krupka, Kenneth M.; Deutsch, William J.; Lindberg, Michael J.

    2009-01-01

    Determinations of elemental and solid-phase compositions, and contaminant release studies have been applied in an ongoing study of residual tank wastes (i.e., waste remaining after final retrieval operations) from five of 149 underground single-shell storage tanks (241-C-103, 241-C-106, 241-C-202, 241-C-203, and 241-S-112) at the U.S. Department of Energy's Hanford Site in Washington State. This work is being conducted to support performance assessments that will be required to evaluate long-term health and safety risks associated with tank site closure. The results of studies completed to date show significant variability in the compositions, solid phase properties, and contaminant release characteristics from these residual tank wastes. This variability is the result of differences in waste chemistry/composition of wastes produced from several different spent fuel reprocessing schemes, subsequent waste reprocessing to remove certain target constituents, tank farm operations that concentrated wastes and mixed wastes between tanks, and differences in retrieval processes used to remove the wastes from the tanks. Release models were developed based upon results of chemical characterization of the bulk residual waste, solid-phase characterization (see companion paper 9277 by Krupka et al.), leaching and extraction experiments, and geochemical modeling. In most cases empirical release models were required to describe contaminant release from these wastes. Release of contaminants from residual waste was frequently found to be controlled by the solubility of phases that could not be identified and/or for which thermodynamic data and/or dissolution rates have not been measured. For example, significant fractions of Tc-99, I-129, and Cr appear to be coprecipitated at trace concentrations in metal oxide phases that could not be identified unambiguously. In the case of U release from tank 241-C-103 residual waste, geochemical calculations indicated that leachate

  12. Do release-site biases reflect response to the Earth's magnetic field during position determination by homing pigeons?

    Science.gov (United States)

    Mora, Cordula V; Walker, Michael M

    2009-09-22

    How homing pigeons (Columba livia) return to their loft from distant, unfamiliar sites has long been a mystery. At many release sites, untreated birds consistently vanish from view in a direction different from the home direction, a phenomenon called the release-site bias. These deviations in flight direction have been implicated in the position determination (or map) step of navigation because they may reflect local distortions in information about location that the birds obtain from the geophysical environment at the release site. Here, we performed a post hoc analysis of the relationship between vanishing bearings and local variations in magnetic intensity using previously published datasets for pigeons homing to lofts in Germany. Vanishing bearings of both experienced and naïve birds were strongly associated with magnetic intensity variations at release sites, with 90 per cent of bearings lying within +/-29 degrees of the magnetic intensity slope or contour direction. Our results (i) demonstrate that pigeons respond in an orderly manner to the local structure of the magnetic field at release sites, (ii) provide a mechanism for the occurrence of release-site biases and (iii) suggest that pigeons may derive spatial information from the magnetic field at the release site that could be used to estimate their current position relative to their loft.

  13. The flooded pit at Aznalcollar (Seville, Spain) and its use as a dumping site for mine waste; La corta inundada de Aznalcollar y su uso como vertedero de residuos mineros (Sevilla, Espana)

    Energy Technology Data Exchange (ETDEWEB)

    Santofimia Pastor, E.; Lopez Pamo, E.; Montero Gonzalez, E.

    2011-07-01

    Since its closure in 1995 and the subsequent failure of the slurry deposit dam in 1998, the Aznalcollar pit has been used as a disposal site for diverse metal-rich materials, such as the polluted soils removed during the cleaning-up of areas along the Guadiamar river together with waste rock, pyrite sludge and ashes deriving from pyrite roasting. At present the pit is partly flooded with a highly acidic (pH 2.7) lake holding some 6 Mm{sup 3} of metal- and sulphate-rich water. Detailed research undertaken in the area during recent years has proved that the dumping of wastes and the inflow of acidic mine waters are having a dramatic effect on the quality of the water in the lake. The greatest effect upon the Aznalcollar lake water was due to the dumping of 1.4 Mm{sup 3} of pyritic wastes during 2005 and 2006. The oxidative dissolution of this mineral has resulted firstly in the total consumption of dissolved oxygen, secondly, a notable increase in electric conductivity (from 8.6 to 12 mS/cm), thirdly, considerable acidification (from pH 4.2 to 2.7) and finally, heating due to the exothermic character of pyrite oxidation. Despite the almost total lack of oxidizing agents such as O{sub 2} and Fe(III) (Fe(III)<5% Fetotal) in the pit lake, pyrite continues to oxidize, producing a concomitant increase in SO{sub 4}{sup 2}- and Fe. (Author) 32 refs.

  14. Radioactive releases from a thorium-contaminated site in Wayne, New Jersey

    International Nuclear Information System (INIS)

    Wang, J.; Yang, J.; Merry-Libby, P.

    1985-01-01

    Various residues and wastes from the production of thorium and rare earths from monazite ore are buried on a hillside in Wayne, New Jersey. In addition, contaminated materials (primarily soils) from nearby vicinity properties are being consolidated onto the Wayne site. The US Department of Energy plans to stabilize all the contaminated materials on an interim basis (20 years) until funding is available to remove them to another location. In order to evaluate the effectiveness of interim stabilization measures, pre-remedial action radioactive releases are compared to estimated releases under a reference stabilization option (one meter of soil cover). Two potential pathways are examined: (1) airborne radioactive gases (thoron and radon) and particulates, and (2) seepage into the near-surface groundwater. The relative reduction of releases into the air and groundwater for the reference stabilization option is analyzed using mathematical models for radioactive gas fluxes and atmospheric dispersion as well as groundwater transport and dispersion. The consequent health implications for nearby individuals and the general population are also estimated. Health effects due to radioactive releases are estimated to be insignificant

  15. Pathways to man for radionuclides released from disposal sites on land

    International Nuclear Information System (INIS)

    Hill, M.D.

    1986-01-01

    To predict the potential radiological impact on man of the disposal of radioactive wastes it is necessary to identify all the events and processes that could cause releases of radionuclides into the environment, to estimate their probabilities of occurrence and to calculate their consequences, for both individuals and populations. This paper briefly reviews the types of releases that have to be considered for land disposal sites and describes the mathematical models used to calculate rates of transport of radionuclides through the environment and doses to man. The difficulties involved in predicting environmental conditions in the far future are discussed, in the light of the ways in which the results of consequence calculations will be used. Assessments of land disposal of long-lived and highly radioactive wastes are briefly reviewed, with the aim of identifying the most important radionuclides and exposure pathways, and the areas where the models and their databases require improvement. (author)

  16. Streamlined approach for environmental restoration closure report for Corrective Action Unit 464: Historical underground storage tank release sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1998-04-01

    This report addresses the site characterization of two historical underground storage tank petroleum hydrocarbon release sites identified by Corrective Action Site (CAS) Numbers 02-02-03 and 09-02-01. The sites are located at the Nevada Test Site in Areas 2 and 9 and are concrete bunker complexes (Bunker 2-300, and 9-300). Characterization was completed using drilling equipment to delineate the extent of petroleum hydrocarbons at release site 2-300-1 (CAS 02-02-03). Based on site observations, the low hydrocarbon concentrations detected, and the delineation of the vertical and lateral extent of subsurface hydrocarbons, an ''A through K'' evaluation was completed to support a request for an Administrative Closure of the site

  17. Streamlined approach for environmental restoration closure report for Corrective Action Unit 464: Historical underground storage tank release sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report addresses the site characterization of two historical underground storage tank petroleum hydrocarbon release sites identified by Corrective Action Site (CAS) Numbers 02-02-03 and 09-02-01. The sites are located at the Nevada Test Site in Areas 2 and 9 and are concrete bunker complexes (Bunker 2-300, and 9-300). Characterization was completed using drilling equipment to delineate the extent of petroleum hydrocarbons at release site 2-300-1 (CAS 02-02-03). Based on site observations, the low hydrocarbon concentrations detected, and the delineation of the vertical and lateral extent of subsurface hydrocarbons, an ``A through K`` evaluation was completed to support a request for an Administrative Closure of the site.

  18. Sustainable Environmental Protection Using Modified Pit-Latrines

    NARCIS (Netherlands)

    Chaggu, E.J.

    2004-01-01

    Pit-latrines are on-site excreta disposal facilities widely used as anaerobic accumulation system for stabilizing human wastes like excreta, both in rural and urban settlements of developing countries. Flooding of pit-latrines is often a common phenomenon, especially in situations of high water

  19. Atmospheric dispersion and deposition of 131I released from the Hanford Site

    International Nuclear Information System (INIS)

    Ramsdell, J.V. Jr.; Simonen, C.A.; Burk, K.W.; Stage, S.A.

    1996-01-01

    Approximately 2.6 x 10 4 TBq (700,000 Ci) of 131 I were released to the air from reactor fuel processing plants on the Hanford Site in southcentral Washington State from December 1944 through December 1949. The Hanford Environmental Dose Reconstruction Project developed a suite of codes to estimate the doses that might have resulted from these releases. The Regional Atmospheric Transport Code for Hanford Emission Tracking (RATCHET) computer code is part of this suite. The RATCHET code implements a Lagrangian-trajectory, Gaussian-puff dispersion model that uses hourly meterological and release rate data to estimate daily time-integrated air concentrations and surface contamination for use, in dose estimates. In this model, iodine is treated as a mixture of three species (inorganic gases, organic gases, and particles). Model deposition parameters are functions of the mixture and meterological conditions. A resistance model is used to calculate dry deposition velocities. Equilibrium between concentrations in the precipitation and the air near the ground is assumed in calculating wet deposition of gases, and irreversible washout of the particles is assumed. RATCHET explicitly treats the uncertainties in model parameters and meteorological conditions. Uncertainties in 131 I release rates and partitioning among the nominal species are treated by varying model input. The results of 100 model runs for December 1944 through December 1949 indicate that monthly average air concentrations and deposition have uncertainties ranging from a factor of two near the center of the time-integrated plume to more than an order of magnitude near the edge. These results indicate that ∼10% of the 131 I released to the atmosphere decayed during transit in the study area, ∼56% was deposited within the study area, and the remaining 34% was transported out of the study area while still in the air

  20. Assessment of radiological consequences of routine releases in a site with various nuclear facilities

    International Nuclear Information System (INIS)

    Lucinio, Elena Albeira Guirado

    2003-01-01

    This work evaluates the radiological consequences of a nuclear site with a complex of fuel enrichment, conversion, reconversion facilities and a nuclear reactor. A methodology recommended by the Commission of the European Communities (CEC) is used and implemented in the PC-CREAM computer code. This code is composed of six linked modules, which describe the transfer of radionuclides to the environment, the pathways on which people may be exposed to radiation, and the radiological consequences. Radiation doses to a selected population are evaluated taking into account atmospheric and aquatic releases. (author)

  1. Multi-kinetics and site-specific release of gabapentin and flurbiprofen from oral fixed-dose combination: in vitro release and in vivo food effect.

    Science.gov (United States)

    Sonvico, Fabio; Conti, Chiara; Colombo, Gaia; Buttini, Francesca; Colombo, Paolo; Bettini, Ruggero; Barchielli, Marco; Leoni, Barbara; Loprete, Luca; Rossi, Alessandra

    2017-09-28

    In this work, a fixed-dose combination of gabapentin and flurbiprofen formulated as multilayer tablets has been designed, developed and studied in vitro and in vivo. The aim was to construct a single dosage form of the two drugs, able to perform a therapeutic program involving three release kinetics and two delivery sites, i.e., immediate release of gabapentin, intra-gastric prolonged release of gabapentin and intestinal (delayed) release of flurbiprofen. An oblong three-layer tablet was manufactured having as top layer a floating hydrophilic polymeric matrix for gastric release of gabapentin, as middle layer a disintegrating formulation for immediate release of a gabapentin loading dose and as bottom layer, an uncoated hydrophilic polymeric matrix, swellable but insoluble in gastric fluids, for delayed and prolonged release of flurbiprofen in intestinal environment. The formulations were studied in vitro and in vivo in healthy volunteers. The in vitro release rate assessment confirmed the programmed delivery design. A significant higher bioavailability of gabapentin administered 30min after meal, compared to fasting conditions or to dose administration 10min before meal, argued in favor of the gastro-retention of gabapentin prolonged release layer. The two drugs were delivered at different anatomical sites, since the food presence prolonged the gastric absorption of gabapentin from the floating layer and delayed the flurbiprofen absorption. The attainment of a successful delayed release of flurbiprofen was realized by a matrix based on a polymers' combination. The combined use of three hydrophilic polymers with different pH sensitivity provided the dosage form layer containing flurbiprofen with gastro-resistant characteristics without the use of film coating. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. Streamlined approach for environmental restoration closure report for Corrective Action Unit 454: Historical underground storage tank release sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1998-04-01

    This report addresses the characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 12-B-1, 12-B-3, and 12-COMM-1. The sites are located within the Nevada Test Site in Area 12 at B Tunnel and a former Communications/Power Maintenance Shop. Release Site 12-B-1 was not able to be clean-closed as proposed in the SAFER Plan. However, hydrocarbon impacted soils were excavated down to bedrock. Release Site 12-B-3 was evaluated to verify that the identified release was not associated with the UST removed from the site. Analytical results support the assumption that wood or possibly a roof sealant used as part of the bunker construction could have been the source of hydrocarbons detected. Release Site 12-COMM-1 was not clean closed as proposed in the SAFER Plan. The vertical extent of impacted soils was determined not to extend below a depth of 2.7 m (9 ft) below ground surface (bgs). The lateral extent could not be defined due to the presence of a discontinuous lens of hydrocarbon-impacted soil

  3. Streamlined approach for environmental restoration closure report for Corrective Action Unit 454: Historical underground storage tank release sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report addresses the characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 12-B-1, 12-B-3, and 12-COMM-1. The sites are located within the Nevada Test Site in Area 12 at B Tunnel and a former Communications/Power Maintenance Shop. Release Site 12-B-1 was not able to be clean-closed as proposed in the SAFER Plan. However, hydrocarbon impacted soils were excavated down to bedrock. Release Site 12-B-3 was evaluated to verify that the identified release was not associated with the UST removed from the site. Analytical results support the assumption that wood or possibly a roof sealant used as part of the bunker construction could have been the source of hydrocarbons detected. Release Site 12-COMM-1 was not clean closed as proposed in the SAFER Plan. The vertical extent of impacted soils was determined not to extend below a depth of 2.7 m (9 ft) below ground surface (bgs). The lateral extent could not be defined due to the presence of a discontinuous lens of hydrocarbon-impacted soil.

  4. Pits on Ascraeus

    Science.gov (United States)

    2005-01-01

    24 September 2005 This Mars Global Surveyor (MGS) Mars Orbiter Camera (MOC) image shows collapse pits and troughs on the lower northeast flank of the giant martian volcano, Ascraeus Mons. Layers of volcanic rock are evident in some of the pit and valley walls, and boulders the size of houses and trucks that were liberated from these walls by gravity can be seen on the floors of the depressions. Location near: 13.6oN, 102.6oW Image width: width: 3 km (1.9 mi) Illumination from: lower left Season: Northern Autumn

  5. Vandellos 1 NPP partial site release after level 2 decommissioning, using Marssim

    Energy Technology Data Exchange (ETDEWEB)

    Medinilla, G.; Sanchez, M.; Peinador, M. [Initec-Westinghouse, Madrid (Spain); Lopez, M.T. [ENRESA, Madrid (Spain)

    2008-07-01

    The Vandellos 1 nuclear power plant is a french technology 480 MWe graphite gas cooled reactor, located in the spanish mediterranean coast, in the province of Tarragona. It started commercial operations in 1972 and that was definitively shutdown after a turbine fire in 1989, being decommissioned by ENRESA to reach IAEA level 2 in 2005, starting a dormancy period that will last around 20 years before the final phase of the decommissioning is executed to reach the ''greenfield'' state. For the plant remaining structures during this dormancy period the site needs not to keep its original size of approx. 130000 m{sup 2}, so ENRESA took the decision of starting a partial site release process of almost a half of the site aiming to exclude that part from regulatory control, applying US MARSSIM methodology. Main activities included: - Site radiological characterization - Derived concentration guideline limits calculation - Definition and classification of survey units Development and testing of scanning devices and procedures - Pilot application of full process to two survey units A summary of the scope and results of these activities is presented in this paper. (authors)

  6. Pneumatic transport system development: residuals and releases program at Westinghouse Cheswick site

    International Nuclear Information System (INIS)

    Larouere, P.J.; Shoulders, J.L.

    1979-01-01

    Plutonium oxide and uranium oxide powders are processed within glove boxes or within confinement systems during the fabrication of mixed oxide (MOX) pellets for recycle fuel. The release of these powders to the glove box or to the confinement results in some airborne material that is deposited in the enclosure or is carried in the air streams to the effluent air filtration system. Release tests on simulated leaks in pneumatic transport equipment and release tests on simulated failures with powder blending equipment were conducted. A task to develop pneumatic transport for the movement of powders within an MOX fabrication plant has been underway at the Westinghouse Research Laboratories. While testing and evaluating selected pneumatic transport components on a full scale were in progress, it was deemed necessary that final verification of the technology would have to be performed with plutonium-bearing powders because of the marked differences in certain properties of plutonium from those of uranium oxides. A smaller was designed and constructed for the planned installation in glove boxes at the Westinghouse Plutonium Fuel Development Laboratory. However, prior to use with plutonium it was agreed that this system be set up and tested with uranium oxide powder. The test program conducted at the Westinghouse Cheswick site was divided into two major parts. The first of these examined the residuals left as a result of the pneumatic transport of nuclear fuel powders and verified the operability of this one-third scale system. The second part of the program studied the amount of powder released to the air when off-standard process procedures or maintenance operations were conducted on the pneumatic transport system. Air samplers located within the walk-in box housing the transport loop were used to measure the solids concentration in the air. From this information, the total amount of airborne powder was determined

  7. CB1 receptor antagonism increases hippocampal acetylcholine release: site and mechanism of action.

    Science.gov (United States)

    Degroot, Aldemar; Köfalvi, Attila; Wade, Mark R; Davis, Richard J; Rodrigues, Ricardo J; Rebola, Nelson; Cunha, Rodrigo A; Nomikos, George G

    2006-10-01

    Evidence indicates that blockade of cannabinoid receptors increases acetylcholine (ACh) release in brain cortical regions. Although it is assumed that this type of effect is mediated through CB1 receptor (CB1R) antagonism, several in vitro functional studies recently have suggested non-CB1R involvement. In addition, neither the precise neuroanatomical site nor the exact mechanisms underlying this effect are known. We thoroughly examined these issues using a combination of systemic and local administration of CB1R antagonists, different methods of in vivo microdialysis, CB1R knockout (KO) mice, tissue measurements of ACh, and immunochemistry. First, we showed that systemic injections of the CB1R antagonists N-(piperidin-1-yl)-5-(4-chlorophenyl)-1-(2,4-dichlorophenyl)-4-methyl-1H-pyrazole-3-carboximide hydrochloride (SR-141716A) and N-(piperidin-1-yl)-5-(4-iodophenyl)-1-(2, 4-dichlorophenyl)-4-methyl-1H-pyrazole-3-carboxamide (AM251) dose-dependently increased hippocampal ACh efflux. Likewise, local hippocampal, but not septal, infusions of SR141716A or AM251 increased hippocampal ACh release. It is noteworthy that the stimulatory effects of systemically administered CB1R antagonists on hippocampal ACh release were completely abolished in CB1R KO mice. CB1R KO mice had similar basal but higher stress-enhanced hippocampal ACh levels compared with wild-type controls. It is interesting that dopamine D1 receptor antagonism counteracted the stimulatory effect of CB1R blockade on hippocampal ACh levels. Finally, immunohistochemical methods revealed that a high proportion of CB1R-positive nerve terminals were found in hippocampus and confirmed the colocalization of CB1 receptors with cholinergic and dopaminergic nerve terminals. In conclusion, hippocampal ACh release may specifically be controlled through CB1Rs located on both cholinergic and dopaminergic neuronal projections, and CB1R antagonism increases hippocampal ACh release, probably through both a direct

  8. Liquid waste processing from TRIGA spent fuel storage pits

    International Nuclear Information System (INIS)

    Buchtela, Karl

    1988-01-01

    At the Atominstitute of the Austrian Universities and also at other facilities running TRIGA reactors, storage pits for spent fuel elements are installed. During the last revision procedure, the reactor group of the Atominstitute decided to refill the storage pits and to get rid of any contaminated storage pit water. The liquid radioactive waste had been pumped to polyethylene vessels for intermediate storage before decontamination and release. The activity concentration of the storage pit water at the Aominstitute after a storage period of several years was about 40 kBq/l, the total amount of liquid in the storage pits was about 0.25 m 3 . It was attempted to find a simple and inexpensive method to remove especially the radioactive Cesium from the waste solution. Different methods for decontamination like distillation, precipitation and ion exchange are discussed

  9. Why do Pit-Hours outlive the Pit?

    NARCIS (Netherlands)

    S.R. Ozturk (Sait); M. van der Wel (Michel); D.J.C. van Dijk (Dick)

    2015-01-01

    markdownabstract__Abstract__ We study why a majority of trades still happen during the pit hours, i.e. when the trading pit is open, even after the pit ceased to be a liquid and informative venue. We investigate the case of 30-year U.S. Treasury futures using a ten-years-long intraday data set

  10. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  11. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2010-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  12. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-11-22

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed

  13. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the

  14. PIT Coating Requirements Analysis

    International Nuclear Information System (INIS)

    MINTEER, D.J.

    2000-01-01

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products

  15. PIT Coating Requirements Analysis

    Energy Technology Data Exchange (ETDEWEB)

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  16. Pitting of 3003 aluminum

    International Nuclear Information System (INIS)

    Lee, R.

    1996-01-01

    The Advanced Photon Source is a state-of-the-art synchrotron light source. The storage ring vacuum chamber is fabricated from 6061 extruded Al. Water connections to the vacuum chambers that were fabricated from 3003 Al had developed water leaks, which were subsequently remedied after considerable investigations. Materials subjected to the pitting analysis in this study are 3003, 6061, and 6063 Al

  17. Pitting corrosion of copper. An equilibrium - mass transport study

    Energy Technology Data Exchange (ETDEWEB)

    Taxen, C

    1996-11-01

    A mathematical model for the propagation of corrosion pits on copper is described. The model is used to predict the potentials below which copper is immune to pitting. The criteria used for immunity against pitting is that the volume of the cuprous oxide formed at the site of the metal oxidation at the bottom of a corrosion pit must be smaller than the volume of the oxidised metal. Equal volumes would give a complete coverage of the metal in a pit by adherent cuprous oxide and propagation would not be possible. For potentials where copper is not immune to pitting an estimate of the maximum growth rate is given. The model uses equilibrium data and diffusion coefficients and calculates the stationary concentration profiles from the bulk water outside a corrosion pit to the site of the metal dissolution at the bottom a corrosion pit. Precipitation of oxides as well as of basic salts of copper is considered. A total of 26 aqueous species are considered in waters with compositions ranging from those of tap waters to that of sea water. Calculations are made for the temperatures 25 deg C and 75 deg C. 38 refs, 60 figs, 17 tabs

  18. Overview of sampling, analysis and data interpretation from sumps and pits

    International Nuclear Information System (INIS)

    Banks, J.C.; Banks, S.J.

    1999-01-01

    Aspects of sampling, environmental analysis and data interpretation for sumps and pits are discussed. According to regulatory requirements of the Alberta Energy and Utilities Board (EUB) and Alberta Environmental Protection (AEP), if a sump or pit is impacting the surrounding environment, the situation must be assessed for remediation. An impact on the environment occurs when chemicals or compounds are introduced at a level that is significant enough to cause a chemical imbalance. The immediate goal in remediating an impacted site should be to contain the released chemical to avoid the movement of the chemical through the environment by dispersion, evaporation, capillary action, bioaccumulation or transfer to groundwater. This paper also discussed some of the key issues that should be considered in properly interpreting analytical data regarding spills and remedial action. 2 refs

  19. Release of Radioactive Scrap Metal/Scrap Metal (RSM/SM) at Nevada Test Site (NTS)

    International Nuclear Information System (INIS)

    1993-01-01

    Reynolds Electrical and Engineering Company, Inc. (REECo) is the prime contractor to the US Department of Energy (DOE) in providing service and support for NTS operations. Mercury Base Camp is the main control point for the many forward areas at NTS, which covers 1,350 square miles. The forward areas are where above-ground and underground nuclear tests have been performed over the last 41 years. No metal (or other material) is returned to Mercury without first being tested for radioactivity. No radioactive metals are allowed to reenter Mercury from the forward areas, other than testing equipment. RAMATROL is the monitor check point. They check material in various ways, including swipe tests, and have a large assortment of equipment for testing. Scrap metal is also checked to address Resource Conservation and Recovery Act concerns. After addressing these issues, the scrap metals are categorized. Federal Property Management Regulations (FPMR) are followed by REECo. The nonradioactive scrap material is sold through the GSA on a scheduled basis. Radioactive scrap metal are presently held in forward areas where they were used. REECo has gained approval of their Nevada Test Site Defense Waste Acceptance Criteria, Certification, and Transfer Requirements, NVO-325 application, which will allow disposal on site, when RSM is declared a waste. The guideline that REECo uses for release limits is DOE Order 5480.11, Radiation Protection for Occupational Works, Attachment 2, Surface Radioactivity Guides, of this order, give release limits for radioactive materials. However, the removal of radioactive materials from NTS require approval by DOE Nevada Operations Office (DOE/NV) on a case-by-case basis. Requirements to consider before removal are found in DOE Order 5820.2A, Radioactive Waste Management

  20. Streamlined approach for environmental restoration closure report for Corrective Action Unit No. 456: Underground storage tank release site 23-111-1, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1998-04-01

    The underground storage tank (UST) release site 23-111-1 is located in Mercury, Nevada. The site is in Area 23 of the Nevada Test Site, (NTS) located on the north side of Building 111. The tank associated with the release was closed in place using cement grout on September 6, 1990. The tank was not closed by removal due to numerous active underground utilities, a high-voltage transformer pad, and overhead power lines. Soil samples collected below the tank bottom at the time of tank closure activities exceeded the Nevada Administrative Code Action Level of 100 milligrams per kilogram (mg/kg) for petroleum hydrocarbons. Maximum concentrations detected were 119 mg/kg. Two passive venting wells were subsequently installed at the tank ends to monitor the progress of biodegradation at the site. Quarterly air sampling from the wells was completed for approximately one year, but was discontinued since data indicated that considerable biodegradation was not occurring at the site

  1. Detailed investigation of current transients from metastable pitting events on stainless steel - the transition to stability

    International Nuclear Information System (INIS)

    Pistorius, P.C.; Burstein, G.T.

    1992-01-01

    Current transients which result from metastable pitting events (on Type 304 stainless steel in an acidic solution containing 1 M Cl - ) are presented. A criterion for the stable growth of open hemispherical pits is developed; the criterion states that the product of current density and pit depth must exceed a certain minimum value, to sustain rapid dissolution. Analysis of the transients from metastable pits shows that these pits fall short of this minimum, as do stable pits initially. The growth of these pits thus requires the presence of another barrier to diffusion, which is thought to be a remnant of the passive film; this forms a flawed cover over the pit mouth. When this cover ruptures under the influence of osmotic pressure, the pit repassivates. Pits growing at higher current densities approach the minimum requirement for stable growth more closely. A ''pitting potential'' results from the effect that metastable pits formed at more positive potentials grow at higher current densities, and are thus more likely to grow into stable pits. The effect of potential on the current density does not result from either activation control or ohmic control; rather, the pits grow under diffusion control. A change, with potential, of the type of pit site which can be activated, causes the potential dependence of the distribution of current densities in metastable pits. Although the distribution of current densities changes with potential, each metastable pit grows under diffusion control with a current density which is independent of the potential; this is confirmed by polarisation tests on growing metastable pits

  2. HTO and OBT activity concentrations in soil at the historical atmospheric HT release site (Chalk River Laboratories)

    International Nuclear Information System (INIS)

    Kim, S.B.; Bredlaw, M.; Korolevych, V.Y.

    2012-01-01

    Tritium is routinely released by the Chalk River Laboratories (CRL) nuclear facilities. Three International HT release experiments have been conducted at the CRL site in the past. The site has not been disturbed since the last historical atmospheric testing in 1994 and presents an opportunity to assess the retention of tritium in soil. This study is devoted to the measurement of HTO and OBT activity concentration profiles in the subsurface 25 cm of soil. In terms of soil HTO, there is no evidence from the past HT release experiments that HTO was retained. The HTO activity concentration in the soil pore water appears similar to concentrations found in background areas in Ontario. In contrast, OBT activity concentrations in soil at the same site were significantly higher than HTO activity concentrations in soil. Elevated OBT appears to reside in the top layer of the soil (0–5 cm). In addition, OBT activity concentrations in the top soil layer did not fluctuate much with season, again, quite in contrast with soil HTO. This result suggests that OBT activity concentrations retained the signature of the historical tritium releases. Highlights: ► At the historical HT release site, HTO and OBT activity concentrations in soil depths were investigated. ► Most organically bound tritium exists in the top layer of the soil. ► The results indicated that OBT activity concentrations can be reflective of historical tritium releases into the environment.

  3. Results of Additional Bioventing Respiration Testing at Sites ST61, ST71, and ST43/55 (Pumphouse III and Valve Pit 3-4)

    National Research Council Canada - National Science Library

    1996-01-01

    ...). Vent well and monitoring point construction, respiration and air permeability testing, soil and soil gas sampling, and blower system installation and startup was performed at each site as part of the initial testing...

  4. Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

    Energy Technology Data Exchange (ETDEWEB)

    French, Sean B. [Los Alamos National Laboratory; Shuman, Rob [URS Coporation

    2012-06-26

    Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts have

  5. Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

    International Nuclear Information System (INIS)

    French, Sean B.; Shuman, Rob

    2012-01-01

    Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D and D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts

  6. Probabilistic siting analysis of nuclear power plants emphasizing atmospheric dispersion of radioactive releases and radiation-induced health effects

    International Nuclear Information System (INIS)

    Savolainen, Ilkka

    1980-01-01

    A presentation is made of probabilistic evaluation schemes for nuclear power plant siting. Effects on health attributable to ionizing radiation are reviewed, for the purpose of assessment of the numbers of the most important health effect cases in light-water reactor accidents. The atmospheric dispersion of radioactive releases from nuclear power plants is discussed, and there is presented an environmental consequence assessment model in which the radioactive releases and atmospheric dispersion of the releases are treated by the application of probabilistic methods. In the model, the environmental effects arising from exposure to radiation are expressed as cumulative probability distributions and expectation values. The probabilistic environmental consequence assessment model has been applied to nuclear power plant site evaluation, including risk-benefit and cost-benefit analyses, and the comparison of various alternative sites. (author)

  7. Estimating release of polycyclic aromatic hydrocarbons from coal-tar contaminated soil at manufactured gas plant sites. Final report

    International Nuclear Information System (INIS)

    Lee, L.S.

    1998-04-01

    One of EPRI's goals regarding the environmental behavior of organic substances consists of developing information and predictive tools to estimate the release potential of polycyclic aromatic hydrocarbons (PAHs) from contaminated soils at manufactured gas (MGP) plant sites. A proper assessment of the distribution of contaminants under equilibrium conditions and the potential for mass-transfer constraints is essential in evaluating the environmental risks of contaminants in the subsurface at MGP sites and for selecting remediation options. The results of this research provide insights into estimating maximum release concentrations of PAHs from MGP soils that have been contaminated by direct contact with the tar or through years of contact with contaminated groundwater. Attention is also given to evaluating the use of water-miscible cosolvents for estimating aqueous phase concentrations, and assessing the role of mass-transfer constraints in the release of PAHs from MGP site soils

  8. pH-sensitive inulin-based nanomicelles for intestinal site-specific and controlled release of celecoxib.

    Science.gov (United States)

    Mandracchia, Delia; Trapani, Adriana; Perteghella, Sara; Sorrenti, Milena; Catenacci, Laura; Torre, Maria Luisa; Trapani, Giuseppe; Tripodo, Giuseppe

    2018-02-01

    Aiming at a site-specific drug release in the lower intestinal tract, this paper deals with the synthesis and physicochemical/biological characterization of pH-sensitive nanomicelles from an inulin (INU) amphiphilic derivative. To allow an intestinal site specific release of the payload, INU-Vitamin E (INVITE) bioconjugates were functionalized with succinic anhydride to provide the system with pH-sensitive groups preventing a premature release of the payload into the stomach. The obtained INVITESA micelles resulted nanosized, with a low critical aggregation concentration and the release studies showed a marked pH-dependent release. The drug loading stabilized the micelles against the acidic hydrolysis. From transport studies on Caco-2 cells, resulted that INVITESA nanomicelles cross the cellular monolayer but are actively re-transported in the secretory (basolateral-apical) direction when loaded in apical side. It suggests that the entrapped drug could not be absorbed before the release from the micelles, enabling so a local release of the active. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    Energy Technology Data Exchange (ETDEWEB)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Health Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

  10. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    International Nuclear Information System (INIS)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Health Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ''shall'' is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project

  11. Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): (sm b ullet) CAS 23-21-03, Bldg 750 Surface Discharge (sm b ullet) CAS 23-25-02, Bldg 750 Outfall (sm b ullet) CAS 23-25-03, Bldg 751 Outfall (sm b ullet) CAS 25-60-01, Bldg 3113A Outfall (sm b ullet) CAS 25-60-02, Bldg 3901 Outfall (sm b ullet) CAS 25-62-01, Bldg 3124 Contaminated Soil (sm b ullet) CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH

  12. Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): {sm_bullet} CAS 23-21-03, Bldg 750 Surface Discharge {sm_bullet} CAS 23-25-02, Bldg 750 Outfall {sm_bullet} CAS 23-25-03, Bldg 751 Outfall {sm_bullet} CAS 25-60-01, Bldg 3113A Outfall {sm_bullet} CAS 25-60-02, Bldg 3901 Outfall {sm_bullet} CAS 25-62-01, Bldg 3124 Contaminated Soil {sm_bullet} CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH-DRO-, PCB

  13. Pitting process visualization

    Directory of Open Access Journals (Sweden)

    Michal Černý

    2010-01-01

    Full Text Available The paper describes time-domain simulation of gear pitting damage using animation program. Key frames have been used to create illusion of motion. The animation uses experimental results of high-cycle fatigue of material. The fatigue damage occurs in the nominal creep area on the side of the gear tooth sample loaded with variable-positioned Hertz pressure. By applying the force, the pressure cumulates between two convex surfaces. This phenomenon results in material damage under of curved surfaces in contact. Moreover, further damage has been registered on the surface. This is due to exceeding the elastic-plastic state limit and development of „tabs“. The tabs serve as origin of surface micro cracks powered by shear stress and enclosed grease pressure as well. This deformation and extreme pressures of Pascal law contribute to elongation and growth of the surface micro crack. Non-homogenous parts of material volume support the initialization/development of the micro cracks as well. Resulting visualization of the tooth-side fatigue damage provides clear and easy-to-understand description of the damage development process right from the micro crack initialization to the final fragmentation due to pitting degradation.

  14. Streamlined approach for environmental restoration closure report for Corrective Action Unit 452: Historical underground storage tank release sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1998-04-01

    This report addresses the site characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 25-3101-1, 25-3102-3, and 25-3152-1. The sites are located within the Nevada Test Site in Area 25 at Buildings 3101, 3102, and 3152. The characterization was completed to support administrative closure of the sites. Characterization was completed using drilling equipment to delineate the extent of hydrocarbon impact. Clean closure had been previously attempted at each of these sites using backhoe equipment without success due to adjacent structures, buried utilities, or depth restrictions associated with each site. Although the depth and extent of hydrocarbon impact was determined to be too extensive for clean closure, it was verified through drilling that the sites should be closed through an administrative closure. The Nevada Administrative Code ''A Through K'' evaluation completed for each site supports that there is no significant risk to human health or the environment from the impacted soils remaining at each site

  15. Light-stimulated cargo release from a core–shell structured nanocomposite for site-specific delivery

    International Nuclear Information System (INIS)

    Cai, Yun; Ling, Li; Li, Xiaofang; Chen, Meng; Su, Likai

    2015-01-01

    This paper reported a core–shell structured site-specific delivery system with a light switch triggered by low energy light (λ=510 nm). Its core was composed of supermagnetic Fe 3 O 4 nanoparticles for magnetic guiding and targeting. Its outer shell consisted of mesoporous silica molecular sieve MCM-41 which offered highly ordered hexagonal tunnels for cargo capacity. A light switch N1-(4aH-cyclopenta[1,2-b:5,4-b′]dipyridin-5(5aH)-ylidene)benzene-1, 4-diamine (CBD) was covalently grafted into these hexagonal tunnels, serving as light stimuli acceptor with loading content of 1.1 μM/g. This composite was fully characterized and confirmed by SEM, TEM, XRD patterns, N 2 adsorption/desorption, thermogravimetric analysis, IR, UV–vis absorption and emission spectra. Experimental data suggested that this composite had a core as wide as 150 nm and could be magnetically guided to specific sites. Its hexagonal tunnels were as long as 180 nm. Upon light stimuli of “on” and “off” states, controllable release was observed with short release time of ~900 s (90% capacity). - Graphical abstract: A core–shell structured site-specific delivery system with a light switch triggered by yellow light was constructed. Controllable release was observed with short release time of ~900 s (90% capacity). - Highlights: • A core–shell structured site-specific delivery system was constructed. • It consisted of Fe 3 O 4 core and MCM-41 shell grafted with light switch. • This delivery system was triggered by low energy light. • Controllable release was observed with short release time of ~900 s

  16. Light-stimulated cargo release from a core–shell structured nanocomposite for site-specific delivery

    Energy Technology Data Exchange (ETDEWEB)

    Cai, Yun; Ling, Li; Li, Xiaofang [Department of Neurology, Affiliated Hospital of Hebei University, Baoding 071000 (China); Chen, Meng [Department of Rheumatology, Affiliated Hospital of Hebei University, Baoding 071000 (China); Su, Likai, E-mail: zhangdong19992003@163.com [Department of Neurology, Affiliated Hospital of Hebei University, Baoding 071000 (China)

    2015-03-15

    This paper reported a core–shell structured site-specific delivery system with a light switch triggered by low energy light (λ=510 nm). Its core was composed of supermagnetic Fe{sub 3}O{sub 4} nanoparticles for magnetic guiding and targeting. Its outer shell consisted of mesoporous silica molecular sieve MCM-41 which offered highly ordered hexagonal tunnels for cargo capacity. A light switch N1-(4aH-cyclopenta[1,2-b:5,4-b′]dipyridin-5(5aH)-ylidene)benzene-1, 4-diamine (CBD) was covalently grafted into these hexagonal tunnels, serving as light stimuli acceptor with loading content of 1.1 μM/g. This composite was fully characterized and confirmed by SEM, TEM, XRD patterns, N{sub 2} adsorption/desorption, thermogravimetric analysis, IR, UV–vis absorption and emission spectra. Experimental data suggested that this composite had a core as wide as 150 nm and could be magnetically guided to specific sites. Its hexagonal tunnels were as long as 180 nm. Upon light stimuli of “on” and “off” states, controllable release was observed with short release time of ~900 s (90% capacity). - Graphical abstract: A core–shell structured site-specific delivery system with a light switch triggered by yellow light was constructed. Controllable release was observed with short release time of ~900 s (90% capacity). - Highlights: • A core–shell structured site-specific delivery system was constructed. • It consisted of Fe{sub 3}O{sub 4} core and MCM-41 shell grafted with light switch. • This delivery system was triggered by low energy light. • Controllable release was observed with short release time of ~900 s.

  17. Pitting corrosion of copper. An equilibrium - mass transport study

    International Nuclear Information System (INIS)

    Taxen, C.

    2002-08-01

    A mathematical model for the propagation of corrosion pits is described and used to calculate the potentials below which copper is immune to pitting. The model uses equilibrium data and diffusion coefficients and calculates the stationary concentration profiles of 26 aqueous species from the bulk water outside a corrosion pit to the site of the metal dissolution. Precipitation of oxides and salts of copper is considered. Studied conditions include water compositions from tap waters to seawater at the temperatures 25 deg C and 75 deg C. Carbonate and sulphate are aggressive towards copper because of complex formation with divalent copper. Carbonate is less aggressive in a corrosion pit than outside at the pH of the bulk. Carbonate carries acidity out from the pit, favours oxide formation and may prevent the initiation of acidic corrosion pits. The concentration profiles are used to estimate the maximum propagation rates for a corrosion pit. A high potential is found to be the most important factor for the rate of propagation. The levels of potential copper can sustain, as corrosion potentials are discussed in terms of the stability of cuprous oxide as a cathode material for oxygen reduction relative to non-conducting cupric phases

  18. Pitting corrosion of copper. An equilibrium - mass transport study

    Energy Technology Data Exchange (ETDEWEB)

    Taxen, C. [Swedish Corrosion Inst., Stockholm (Sweden)

    2002-08-01

    A mathematical model for the propagation of corrosion pits is described and used to calculate the potentials below which copper is immune to pitting. The model uses equilibrium data and diffusion coefficients and calculates the stationary concentration profiles of 26 aqueous species from the bulk water outside a corrosion pit to the site of the metal dissolution. Precipitation of oxides and salts of copper is considered. Studied conditions include water compositions from tap waters to seawater at the temperatures 25 deg C and 75 deg C. Carbonate and sulphate are aggressive towards copper because of complex formation with divalent copper. Carbonate is less aggressive in a corrosion pit than outside at the pH of the bulk. Carbonate carries acidity out from the pit, favours oxide formation and may prevent the initiation of acidic corrosion pits. The concentration profiles are used to estimate the maximum propagation rates for a corrosion pit. A high potential is found to be the most important factor for the rate of propagation. The levels of potential copper can sustain, as corrosion potentials are discussed in terms of the stability of cuprous oxide as a cathode material for oxygen reduction relative to non-conducting cupric phases.

  19. Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2008-09-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at

  20. PIT Tagging Anurans

    Science.gov (United States)

    McCreary, Brome

    2008-01-01

    The following video demonstrates a procedure to insert a passive integrated transponder (PIT) tag under the skin of an anuran (frog or toad) for research and monitoring purposes. Typically, a 12.5 mm tag (0.5 in.) is used to uniquely identify individual anurans as smal as 40 mm (1.6 in.) in length from snout to vent. Smaller tags are also available and allow smaller anurans to be tagged. The procedure does not differ for other sizes of tages or other sizes of anurans. Anyone using this procedure should ensure that the tag is small enough to fit easily behind the sacral hump of the anuran, as shown in this video.

  1. Open-pit construction

    International Nuclear Information System (INIS)

    1981-06-01

    The conceptual design of a nuclear power plant accordingly to SR 136, situated in deep open pits in rock near the brink of a plateau and accessible from above as well as horizontally from the receiving stream, was further worked out. The increased backfill covering enables the reactor building to withstand heavier external forces and higher internal pressure caused by contaminated atmosphere in the event of severe hypothetical internal accidents. The leakage of this atmosphere is to be collected in special condensation rooms and another part of it is to be cooled down in these rooms. An outer safety barrier and leakage extraction fans keep this atmosphere substantially enclosed. By that means the consequences of a core melt accident will be reduced considerably. (orig.) [de

  2. The cleanup of releases of radioactive materials from commercial low-level radioactive waste disposal sites: Whose jurisdiction?

    International Nuclear Information System (INIS)

    Hartnett, C.

    1994-01-01

    There exists an overlap between the Comprehensive Environmental Response, Compensation and Recovery Act (open-quotes CERCLAclose quotes) and the Atomic Energy Act (open-quotes AEAclose quotes) regarding the cleanup of releases of radioactive materials from commercial low-level radioactive waste sites. The Nuclear Regulatory Commission (open-quotes NRCclose quotes) and Agreement States have jurisdiction under the AEA, and the Environmental Protection Agency (open-quotes EPAclose quotes) has jurisdiction pursuant to CERCLA. This overlapping jurisdiction has the effect of imposing CERCLA liability on parties who have complied with AEA regulations. However, CERCLA was not intended to preempt existing legislation. This is evidenced by the federally permitted release exemption, which explicitly exempts releases from CERCLA liability pursuant to an AEA license. With little guidance as to the applicability of this exemption, it is uncertain whether CERCLA's liability is broad enough to supersede the Atomic Energy Act. It is the purpose of this paper to discuss the overlapping jurisdiction for the cleanup of releases of radioactive materials from commercial low-level radioactive waste disposal sites with particular emphasis on the cleanup at the Maxey Flats, West Valley and Sheffield sites

  3. Potential Release Site Sediment Concentrations Correlated to Storm Water Station Runoff through GIS Modeling

    International Nuclear Information System (INIS)

    McLean, C.T.

    2005-01-01

    This research examined the relationship between sediment sample data taken at Potential Release Sites (PRSs) and storm water samples taken at selected sites in and around Los Alamos National Laboratory (LANL). The PRSs had been evaluated for erosion potential and a matrix scoring system implemented. It was assumed that there would be a stronger relationship between the high erosion PRSs and the storm water samples. To establish the relationship, the research was broken into two areas. The first area was raster-based modeling, and the second area was data analysis utilizing the raster based modeling results and the sediment and storm water sample results. Two geodatabases were created utilizing raster modeling functions and the Arc Hydro program. The geodatabase created using only Arc Hydro functions contains very fine catchment drainage areas in association with the geometric network and can be used for future contaminant tracking. The second geodatabase contains sub-watersheds for all storm water stations used in the study along with a geometric network. The second area of the study focused on data analysis. The analytical sediment data table was joined to the PRSs spatial data in ArcMap. All PRSs and PRSs with high erosion potential were joined separately to create two datasets for each of 14 analytes. Only the PRSs above the background value were retained. The storm water station spatial data were joined to the table of analyte values that were either greater than the National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP) benchmark value, or the Department of Energy (DOE) Drinking Water Defined Contribution Guideline (DWDCG). Only the storm water stations were retained that had sample values greater than the NPDES MSGP benchmark value or the DOE DWDCG. Separate maps were created for each analyte showing the sub-watersheds, the PRSs over background, and the storm water stations greater than the NPDES MSGP benchmark value or the

  4. Protocol for development of authorized release limits for concrete at U.S. Department of Energy sites

    International Nuclear Information System (INIS)

    Arnish, J.; Kamboj, S.; Chen, S.-Y.; Parker, F. L.; Smith, A. M.; Meservey, R. H.; Tripp, J. L.

    2000-01-01

    The purpose of this protocol is to assist US Department of Energy (DOE) sites in releasing concrete for reuse. Current regulations allow the sites to release surface-contaminated materials if their radioactivity falls below certain levels and to possibly release materials with volumetric contamination or higher levels of surface contamination on a case-by-case basis. In all cases, an ALARA (as low as reasonably achievable) analysis that evaluates the risks of releasing volumetrically contaminated concrete or concrete with higher levels of surface contamination is required as a basis for proposing and setting new release limits that allow for reuse of the concrete material. To evaluate the dose impacts of reusing radioactively contaminated material, the measured radiation levels (pCi/g or disintegrations per minute [dpm]/100 cm 2 ) must be converted to the estimated dose (mrem/yr) that would be received by affected individuals. The dose depends on the amounts and types of isotopes present and the time, distance, and method of exposure (e.g., inhalation or external exposure). For each disposition alternative, the protocol provides a systematic method to evaluate the impact of the dose on the affected individuals. The cost impacts of reusing concrete also need to be evaluated. They too depend on the disposition alternative and the extent and type of contamination. The protocol provides a method to perform a detailed analysis of these factors and evaluate the dose and cost impacts for various disposition alternatives. Once the dose and cost impacts of the various alternatives have been estimated, the protocol outlines the steps required to propose new release standards that allow release and reuse of the concrete material

  5. Treatment of a mud pit by bioremediation.

    Science.gov (United States)

    Avdalović, Jelena; Đurić, Aleksandra; Miletić, Srdjan; Ilić, Mila; Milić, Jelena; Vrvić, Miroslav M

    2016-08-01

    The mud generated from oil and natural gas drilling, presents a considerable ecological problem. There are still insufficient remedies for the removal and minimization of these very stable emulsions. Existing technologies that are in use, more or less successfully, treat about 20% of generated waste drilling mud, while the rest is temporarily deposited in so-called mud pits. This study investigated in situ bioremediation of a mud pit. The bioremediation technology used in this case was based on the use of naturally occurring microorganisms, isolated from the contaminated site, which were capable of using the contaminating substances as nutrients. The bioremediation was stimulated through repeated inoculation with a zymogenous microbial consortium, along with mixing, watering and biostimulation. Application of these bioremediation techniques reduced the concentration of total petroleum hydrocarbons from 32.2 to 1.5 g kg(-1) (95% degradation) during six months of treatment. © The Author(s) 2016.

  6. Influence of Nest Box Color and Release Sites on Osmia lignaria (Hymenoptera: Megachilidae) Reproductive Success in a Commercial Almond Orchard.

    Science.gov (United States)

    Artz, Derek R; Allan, Matthew J; Wardell, Gordon I; Pitts-Singer, Theresa L

    2014-12-01

    Intensively managed, commercial orchards offer resources for managed solitary bees within agricultural landscapes and provide a means to study bee dispersal patterns, spatial movement, nest establishment, and reproduction. In 2012, we studied the impact of 1) the color of nest boxes covaried with four nest box density treatments and 2) the number of bee release sites covaried with two nest box density treatments on the reproductive success of Osmia lignaria Say in a California almond orchard pollinated by a mixture of O. lignaria and Apis mellifera L. Nest box color influenced the number of nests, total cells, and cells with male and female brood. More nests and cells were produced in light blue nest boxes than in orange or yellow nest boxes. The covariate nest box density also had a significant effect on brood production. The number of release sites did not affect O. lignaria nesting and reproduction, but the number of cavities in nest boxes influenced reproduction. Overall, the color of nest boxes and their distribution, but not the number of release sites, can greatly affect O. lignaria nest establishment and reproductive success in a commercial almond orchard. The ability to locate nesting sites in a homogenous, large orchard landscape may also be facilitated by the higher frequency of nest boxes with low numbers of cavities, and by the ability to detect certain nest box colors that best contrast with the blooming trees. © 2014 Entomological Society of America.

  7. pitting corrosion susceptibility pitting corrosion susceptibility of aisi

    African Journals Online (AJOL)

    eobe

    2DEPARTMENT OF MECHANICAL ENGINEERING, UNIVERSITY OF BENIN, BENIN- CITY, EDO STATE, NIGERIA. E-mail addresses: ... fluids and aggressive chemicals. Pitting corrosion ... the kitchen, food manufacturing and dispensing and.

  8. Detection of simulated pitting corrosion and noises in crude oil storage tank by acoustic emission

    International Nuclear Information System (INIS)

    Shukri Mohd; Latif, N.A.; Azhar Mohd Sinin; Mohamad Daud; Abd Nasir Ibrahim

    2008-01-01

    The damage mechanisms associated with crude oil storage tanks can be complex and varied and include pitting corrosion due to presence of species such as sulphate reducing bacteria. Acoustic Emission (AE) could be used to characterise the pitting corrosion signal in crude oil storage tanks but it is extremely difficult to simulate the pitting corrosion in the laboratory using crude oil as electrolyte because crude oil is considered as non corrosive medium. In this study, induced current have been introduced onto a surface ASTM 516 steel as an electrical source to simulate the electrical noise produced during pitting corrosion process and AE sensor have been used to detect this current. It is found that AE system could detect AE signal release during current induction this current and is expected that if the exact simulation of the current magnitude produced during pitting corrosion process is made available, AE characterisation of pitting corrosion in such tank could be made possible. (Author)

  9. Corrective Action Decision Document for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada, Revision 0 with Errata

    Energy Technology Data Exchange (ETDEWEB)

    Boehlecke, Robert

    2004-11-01

    This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site (NTS), Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 536 is comprised of a single Corrective Action Site (CAS), 03-44-02, Steam Jenny Discharge, and is located in Area 3 of the NTS (Figure 1-2). The CAU was investigated in accordance with the Corrective Action Investigation Plan (CAIP) and Record of Technical Change (ROTC) No. 1 (NNSA/NV, 2003). The CADD provides or references the specific information necessary to support the recommended corrective action alternative selected to complete closure of the site. The CAU 536, Area 3 Release Site, includes the Steam Jenny Discharge (CAS 03-44-02) that was historically used for steam cleaning equipment in the Area 3 Camp. Concerns at this CAS include contaminants commonly associated with steam cleaning operations and Area 3 Camp activities that include total petroleum hydrocarbons (TPH), unspecified solvents, radionuclides, metals, and polychlorinated biphenyls (PCBs). The CAIP for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (NNSA/NV, 2003), provides additional information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for the CAS within CAU 536. The evaluation of corrective action alternatives is based on process knowledge and the results of the investigative activities conducted in accordance with the CAIP (NNSA/NV, 2003) that was approved prior to the start of the

  10. Data Summary Report for teh Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Hulstrom, L.

    2011-02-07

    This data summary report summarizes the investigation results to evaluate the nature and distribution of Hanford Site-related contaminants present in the Columbia River. As detailed in DOE/RL-2008-11, more than 2,000 environmental samples were collected from the Columbia River between 2008 and 2010. These samples consisted of island soil, sediment, surface water, groundwater upwelling (pore water, surface water, and sediment), and fish tissue.

  11. Accidental Release of Chlorine from a Storage Facility and an On-Site Emergency Mock Drill: A Case Study

    Directory of Open Access Journals (Sweden)

    Ambalathumpara Raman Soman

    2015-01-01

    Full Text Available In the current industrial scenario there is a serious need for formulating strategies to handle hazardous substances in the safest way. Manufacture, storage, and use of hazardous substances pose a serious risk to industry, people, and the environment. Accidental release of toxic chemicals can lead to emergencies. An emergency response plan (ERP is inevitable to minimize the adverse effects of such releases. The on-site emergency plan is an integral component of any process safety and risk management system. This paper deals with an on-site emergency response plan for a chlorine manufacturing industry. It was developed on the basis of a previous study on chlorine release and a full scale mock drill has been conducted for testing the plan. Results indicated that properly trained personnel can effectively handle each level of incidents occurring in the process plant. As an extensive guideline to the district level government authorities for off-site emergency planning, risk zone has also been estimated with reference to a chlorine exposure threshold of 3 ppm.

  12. Gas cylinder disposal pit remediation waste minimization and management

    International Nuclear Information System (INIS)

    Alas, C.A.; Solow, A.; Criswell, C.W.; Spengler, D.; Brannon, R.; Schwender, J.M.; Eckman, C.K.; Rusthoven, T.

    1995-01-01

    A remediation of a gas cylinder disposal pit at Sandia National Laboratories, New Mexico has recently been completed. The cleanup prevented possible spontaneous releases of hazardous gases from corroded cylinders that may have affected nearby active test areas at Sandia's Technical Area III. Special waste management, safety, and quality plans were developed and strictly implemented for this project. The project was conceived from a waste management perspective, and waste minimization and management were built into the planning and implementation phases. The site layout was planned to accommodate light and heavy equipment, storage of large quantities of suspect soil, and special areas to stage and treat gases and reactive chemicals removed from the pit, as well as radiation protection areas. Excavation was a tightly controlled activity using experienced gas cylinder and reactive chemical specialists. Hazardous operations were conducted at night under lights, to allow nearby daytime operations to function unhindered. The quality assurance plan provided specific control of, and documentation for, critical decisions, as well as the record of daily operations. Both hand and heavy equipment excavation techniques were utilized. Hand excavation techniques were utilized. Hand excavation techniques allows sealed glass containers to be exhumed unharmed. In the end, several dozen thermal batteries; 5 pounds (2.3 kg) of lithium metal; 6.6 pounds (3.0 kg) of rubidium metal; several kilograms of unknown chemicals; 140 cubic yards (107 cubic meters) of thorium-contaminated soil; 270 cubic yards (205 cubic meters) of chromium-contaminated soil; and 450 gas cylinders, including 97 intact cylinders containing inert, flammable, toxic, corrosive, or oxidizing gases were removed and effectively managed to minimize waste

  13. PIT Tag data - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  14. DEEP VADOSE ZONE CONTAMINATION DUE TO RELEASES FROM HANFORD SITE TANKS

    International Nuclear Information System (INIS)

    JARAYSI MN

    2008-01-01

    CH2M HILL Hanford Group, Inc. (the Hanford Tank Farm Operations contractor) and the Department of Energy's Office of River Protection have just completed the first phase of the Hanford Single-Shell Tank RCRA Corrective Action Program. The focus of this first phase was to characterize the nature and extent of past Hanford single-shell tank releases and to characterize the resulting fate and transport of the released contaminants. Most of these plumes are below 20 meters, with some reaching groundwater (at 60 to 120 meters below ground surface [bgs])

  15. Single pit propagation on austenitic stainless steel

    International Nuclear Information System (INIS)

    Heurtault, Stephane

    2016-01-01

    The electrochemical characterization of metastable events such as pitting corrosion of stainless steel in chloride electrolyte remains complex because many individual processes may occur simultaneously on the alloy surface. To overcome these difficulties, an experimental setup, the flow micro-device, has been developed to achieve the initiation of a single pit and to propagate the single pit in three dimensions. In this work, we take advantage of such a device in order to revisit the pitting process on a 316L stainless steel in a chloride - sulphate bulk. In a first step, the time evolution of the pit geometry (depth, radius) and the chemical evolution of the pit solution investigated using in situ Raman spectroscopy have shown that the pit depth propagation depends on the formation of a metal chloride and sulphate gel in the pit solution, and is controlled by the metallic cations diffusion from the pit bottom to the pit mouth. The pit radius growth is defined by the initial surface de-passivation, by the presence of a pit cover and by the gel development in the solution. all of these phenomena are function of applied potential and chemical composition of the solution. In a last step, it was demonstrated that a critical chloride concentration is needed in order to maintain the pit propagation. This critical concentration slightly increases with the pit depth. From statistical analysis performed on identical experiments, a zone diagram showing the pit stability as a function of the chloride concentration and the pit dimensions was built. (author) [fr

  16. Flare pit reclamation in British Columbia

    International Nuclear Information System (INIS)

    Mitchell, J.D.

    1997-01-01

    The legislative acts and policies administered by the Pollution Prevention program of the B.C. Ministry of Environment, Lands and Parks, (MELP) were reviewed. MELP is responsible for protecting land, water, air and living resources. Past oil and gas activities have left behind high levels of hazardous materials spills on the land which can pose a risk to human health. Flare pits are also a potential source of soil and groundwater contamination, therefore proper management and remediation of these sites is critical to ensuring that adverse impacts do not occur due to contamination of the sites. MELP has created a Contaminated Sites Regulation (CSR) which presents a consistent approach to ensuring protection of human health, the environment and property. This paper explores key provisions of the CSR, the prescribed contaminated sites management process and compares the B.C. legislation with that of neighbouring Alberta. 5 refs., 1 tab., 4 figs

  17. Closure Report for Corrective Action Unit 481: Area 12 T-Tunnel Conditional Release Storage Yard, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    Corrective Action Unit (CAU) 481 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Area 12 T-Tunnel Conditional Release Storage Yard. CAU 481 is located in Area 12 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. This CAU consists of one Corrective Action Site (CAS), CAS 12-42-05, Housekeeping Waste. CAU 481 closure activities were conducted by the Defense Threat Reduction Agency from August 2007 through July 2008 according to the FFACO and Revision 3 of the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites. Closure activities included removal and disposal of construction debris and low-level waste. Drained fluids, steel, and lead was recycled as appropriate. Waste generated during closure activities was appropriately managed and disposed.

  18. Corrective Action Investigation Plan for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (Rev. 0 / June 2003), Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-06-27

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives for CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.

  19. The Pit and the Safety Pendulum

    Energy Technology Data Exchange (ETDEWEB)

    Nitschke, Robert Leon; Ramos, Amadeo Gabriel

    2000-11-01

    The hypothesis of this paper is that the safety analysis pendulum has swung considerably in the direction of increasingly complex and lengthy safety evaluations and intense reviews during the past 30 years. The test of this hypothesis will be a review of the safety analysis conducted for various activities associated with the retrieval of transuranic radioactive waste from burial pits at a National Laboratory site over a span of 30 years. The examination will focus on the safety aspects and the safety analysis that was conducted for the projects. At the conclusion of this examination, the paper will identify five reasons why the changes have taken place.

  20. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer, Volume 1

    International Nuclear Information System (INIS)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-01-01

    In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest risks of contracting thyroid cancer. Doses from cow's milk are considerably less . Detailed

  1. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-07-01

    In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest risks of contracting thyroid cancer. Doses from cow

  2. Mesoscale atmospheric modeling of the July 12, 1992 tritium release from the Savannah River Site

    International Nuclear Information System (INIS)

    Fast, J.D.; O'Steen, B.L.; Addis, R.P.

    1992-01-01

    In August of 1991, the Environmental Transport Group (ETG) began the development of an advanced Emergency Response (ER) system based upon the Colorado State University Regional Atmospheric Modeling System (RAMS). This model simulates the three-dimensional, time-dependent, flow field and thermodynamic structure of the planetary boundary layer (PBL). A companion Lagrangian Particle Dispersion Model (LPDM) simulates contaminant transport based on the flow and turbulence fields generated by RAMS. This paper describes the performance of the advanced ER system in predicting transport and diffusion near the SRS when compared to meteorological and sampling data taken during the July 12, 1992 tritium release. Since PUFF/PLUME and 2DPUF are two Weather INformation and Display (WIND) System atmospheric models that were used to predict the transport and diffusion of the plume at the time of the release, the results from the advanced ER system are also compared to those produced by PUFF/PLUME and 2DPUF

  3. Effect of co-administration of probiotics with polysaccharide based colon targeted delivery systems to optimize site specific drug release.

    Science.gov (United States)

    Prudhviraj, G; Vaidya, Yogyata; Singh, Sachin Kumar; Yadav, Ankit Kumar; Kaur, Puneet; Gulati, Monica; Gowthamarajan, K

    2015-11-01

    Significant clinical success of colon targeted dosage forms has been limited by their inappropriate release profile at the target site. Their failure to release the drug completely in the colon may be attributed to changes in the colonic milieu because of pathological state, drug effect and psychological stress accompanying the diseased state or, a combination of these. Alteration in normal colonic pH and bacterial picture leads to incomplete release of drug from the designed delivery system. We report the effectiveness of a targeted delivery system wherein the constant replenishment of the colonic microbiota is achieved by concomitant administration of probiotics along with the polysaccharide based drug delivery system. Guar gum coated spheroids of sulfasalazine were prepared. In the dissolution studies, these spheroids showed markedly higher release in the simulated colonic fluid. In vivo experiments conducted in rats clearly demonstrated the therapeutic advantage of co-administration of probiotics with guar gum coated spheroids. Our results suggest that concomitant use of probiotics along with the polysaccharide based delivery systems can be a simple strategy to achieve satisfactory colon targeting of drugs. Copyright © 2015 Elsevier B.V. All rights reserved.

  4. Standard guide for radioactive pathway methodology for release of sites following decommissioning

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The purpose of this guide is to provide guidance in determining site-specific conversion factors for translating between dose limits and residual radioactive contamination levels on equipment structures, and land areas. This guide is to serve as a guide to acceptable methodology for translating the yet to be determined dose limits into allowable levels of residual radioactive materials that can be left at a site following decommissioning

  5. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    A. T. Urbon

    2001-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01--Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02--A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04--A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01--Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget.

  6. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    A. T. Urbon

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01-Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02-A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04-A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01-Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m(sup 3)) (70 cubic yards[yd(sup 3)]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget

  7. Two CGTCA motifs and a GHF1/Pit1 binding site mediate cAMP-dependent protein kinase A regulation of human growth hormone gene expression in rat anterior pituitary GC cells.

    Science.gov (United States)

    Shepard, A R; Zhang, W; Eberhardt, N L

    1994-01-21

    We established the cis-acting elements which mediate cAMP responsiveness of the human growth hormone (hGH) gene in transiently transfected rat anterior pituitary tumor GC cells. Analysis of the intact hGH gene or hGH 5'-flanking DNA (5'-FR) coupled to the hGh cDNA or chloramphenicol acetyltransferase or luciferase genes, indicated that cAMP primarily stimulated hGH promoter activity. Cotransfection of a protein kinase A inhibitory protein cDNA demonstrated that the cAMP response was mediated by protein kinase A. Mutational analysis of the hGH promoter identified two core cAMP response element motifs (CGTCA) located at nucleotides -187/-183 (distal cAMP response element; dCRE) and -99/-95 (proximal cAMP response element; pCRE) and a pituitary-specific transcription factor (GHF1/Pit1) binding site at nucleotides -123/-112 (dGHF1) which were required for cAMP responsiveness. GHF1 was not a limiting factor, since overexpression of GHF1 in cotransfections increased basal but not forskolin induction levels. Gel shift analyses indicated that similar, ubiquitous, thermostable protein(s) specifically bound the pCRE and dCRE motifs. The CGTCA motif-binding factors were cAMP response element binding protein (CREB)/activating transcription factor-1 (ATF-1)-related, since the DNA-protein complex was competed by unlabeled CREB consensus oligonucleotide, specifically supershifted by antisera to CREB and ATF-1 but not ATF-2, and was bound by purified CREB with the same relative binding affinity (pCRE < dCRE < CREB) and mobility as the GC nuclear extract. UV cross-linking and Southwestern blot analyses revealed multiple DNA-protein interactions of which approximately 100- and approximately 45-kDa proteins were predominant; the approximately 45-kDa protein may represent CREB. These results indicate that CREB/ATF-1-related factors act coordinately with the cell-specific factor GHF1 to mediate cAMP-dependent regulation of hGH-1 gene transcription in anterior pituitary somatotrophs.

  8. Stochastic modeling of pitting corrosion: A new model for initiation and growth of multiple corrosion pits

    International Nuclear Information System (INIS)

    Valor, A.; Caleyo, F.; Alfonso, L.; Rivas, D.; Hallen, J.M.

    2007-01-01

    In this work, a new stochastic model capable of simulating pitting corrosion is developed and validated. Pitting corrosion is modeled as the combination of two stochastic processes: pit initiation and pit growth. Pit generation is modeled as a nonhomogeneous Poisson process, in which induction time for pit initiation is simulated as the realization of a Weibull process. In this way, the exponential and Weibull distributions can be considered as the possible distributions for pit initiation time. Pit growth is simulated using a nonhomogeneous Markov process. Extreme value statistics is used to find the distribution of maximum pit depths resulting from the combination of the initiation and growth processes for multiple pits. The proposed model is validated using several published experiments on pitting corrosion. It is capable of reproducing the experimental observations with higher quality than the stochastic models available in the literature for pitting corrosion

  9. Stochastic modeling of pitting corrosion: A new model for initiation and growth of multiple corrosion pits

    Energy Technology Data Exchange (ETDEWEB)

    Valor, A. [Facultad de Fisica, Universidad de La Habana, San Lazaro y L, Vedado, 10400 Havana (Cuba); Caleyo, F. [Departamento de Ingenieria, Metalurgica, IPN-ESIQIE, UPALM Edif. 7, Zacatenco, Mexico DF 07738 (Mexico)]. E-mail: fcaleyo@gmail.com; Alfonso, L. [Departamento de Ingenieria, Metalurgica, IPN-ESIQIE, UPALM Edif. 7, Zacatenco, Mexico DF 07738 (Mexico); Rivas, D. [Departamento de Ingenieria, Metalurgica, IPN-ESIQIE, UPALM Edif. 7, Zacatenco, Mexico DF 07738 (Mexico); Hallen, J.M. [Departamento de Ingenieria, Metalurgica, IPN-ESIQIE, UPALM Edif. 7, Zacatenco, Mexico DF 07738 (Mexico)

    2007-02-15

    In this work, a new stochastic model capable of simulating pitting corrosion is developed and validated. Pitting corrosion is modeled as the combination of two stochastic processes: pit initiation and pit growth. Pit generation is modeled as a nonhomogeneous Poisson process, in which induction time for pit initiation is simulated as the realization of a Weibull process. In this way, the exponential and Weibull distributions can be considered as the possible distributions for pit initiation time. Pit growth is simulated using a nonhomogeneous Markov process. Extreme value statistics is used to find the distribution of maximum pit depths resulting from the combination of the initiation and growth processes for multiple pits. The proposed model is validated using several published experiments on pitting corrosion. It is capable of reproducing the experimental observations with higher quality than the stochastic models available in the literature for pitting corrosion.

  10. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Rev. No. 0

    Energy Technology Data Exchange (ETDEWEB)

    Robert Boehlecke

    2004-12-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 322 is comprised of the following corrective action sites (CASs): (1) 01-25-01 - AST Release Site; (2) 03-25-03 - Mud Plant and AST Diesel Release; and (3) 03-20-05 - Injection Wells and BOP Shop. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for each CAS within CAU 322. Corrective action investigation activities were performed from April 2004 through September 2004, as set forth in the Corrective Action Investigation Plan. The purposes of the activities as defined during the data quality objectives process were: (1) Determine if contaminants of concern (COCs) are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to recommend appropriate corrective actions for the CASs. Analytes detected during the corrective action investigation were evaluated against appropriate preliminary action levels to identify contaminants of concern for each corrective action site. Radiological field measurements were compared to unrestricted release criteria. Assessment of the data generated from investigation activities revealed the following: (1) CAS 01-25-01 contains an AST berm contaminated with total petroleum hydrocarbons (TPH) diesel-range organics (DRO). (2) CAS 03-25-03 includes two distinct areas: Area A where no contamination remains from a potential spill associated with an AST, and Area B where TPH-DRO contamination associated with various activities at the mud plant was identified. The Area B contamination was found at various locations and depths. (3) CAS 03-25-03 Area B contains TPH-DRO contamination at various

  11. Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit

    International Nuclear Information System (INIS)

    Clark, S.W.; Sulloway, H.M.

    2007-01-01

    This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion

  12. Hanford Site Tank 241-C-108 Residual Waste Contaminant Release Models and Supporting Data

    Energy Technology Data Exchange (ETDEWEB)

    Cantrell, Kirk J.; Krupka, Kenneth M.; Geiszler, Keith N.; Arey, Bruce W.; Schaef, Herbert T.

    2010-06-18

    This report presents the results of laboratory characterization, testing, and analysis for a composite sample (designated 20578) of residual waste collected from single-shell tank C-108 during the waste retrieval process after modified sluicing. These studies were completed to characterize concentration and form of contaminant of interest in the residual waste; assess the leachability of contaminants from the solids; and develop release models for contaminants of interest. Because modified sluicing did not achieve 99% removal of the waste, it is expected that additional retrieval processing will take place. As a result, the sample analyzed here is not expected to represent final retrieval sample.

  13. UFOING: A program for assessing the off-site consequences from ingestion of accidentally released radionuclides

    International Nuclear Information System (INIS)

    Steinhauer, C.

    1988-12-01

    The program UFOING estimates foodchain-related consequences following accidental releases of radionuclides to the atmosphere. It was developed as a stand-alone supplement to the accident consequence assessment program system UFOMOD to allow faster and more detailed investigations of the consequences arising from the foodchain pathways than possible with the version of UFOING which is implemented in UFOMOD. For assumed releases at different times of the year, age dependent individual doses, collective doses, individual risks for fatal stochastic somatic health effects as a function of time, the total numbers of the effects, and the areas affected by foodbans together with the estimated duration of the bans are calculated. In addition, percentage contributions of radionuclides and foodstuffs to the doses and risks can be evaluated. In the first part of this report, an overview over the program is given. The other parts contain a user's guide, a program guide, and descriptions of the data employed and of the version of UFOING which is implemented in UFOMOD. (orig.) [de

  14. Degradation of tropoelastin by matrix metalloproteinases--cleavage site specificities and release of matrikines

    DEFF Research Database (Denmark)

    Heinz, Andrea; Jung, Michael C; Duca, Laurent

    2010-01-01

    To provide a basis for the development of approaches to treat elastin-degrading diseases, the aim of this study was to investigate the degradation of the natural substrate tropoelastin by the elastinolytic matrix metalloproteinases MMP-7, MMP-9, and MMP-12 and to compare the cleavage site...

  15. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R.; Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  16. The Fukushima Daiichi nuclear site. Airborne releases during works on unit 3 in August 2013

    International Nuclear Information System (INIS)

    2014-07-01

    After having briefly recalled the consequences of the earthquake and tsunami on the Fukushima-Daiichi nuclear power station, this document briefly describes what happened to the building of the reactor number 3, and works to be done to dismantle this installation: removal of damaged structures, of debris in the pool, and then removal of fuel from this pool, removal of the core degraded fuel. The removal of structures and debris has been achieved in October 2013, but leaded to radioactive airborne releases. Simulations of atmospheric dispersion have been performed by the IRSN. Radioactive measurements have been also performed, and the evolution of crop contamination between 2011 and 2013 is discussed, notably in the case of rice. Lessons learned can be useful for the dismantling of other units

  17. Hazards to nuclear plants from off-site release of toxic vapors

    International Nuclear Information System (INIS)

    Hornyik, K.

    1976-01-01

    A method for the assessment of risk involved in shipping toxic compounds past nuclear power plants uses a postulated chain of events, starting with a traffic accident causing instantaneous release of the compound as vapor, and leading to incapacitation of control operators in the nuclear plant, described by deterministic and statistical models as appropriate to the respective event. Statistical treatment of relevant atmospheric conditions is a major improvement over more conservative assumptions commonly made in current analyses of this problem. Consequently, one obtains a substantial reduction in the estimated risk expressed in usual terms of the annual probability of an unacceptable event, in spite of the fact that no credit is taken for protective measures other than potential control room isolation

  18. Dendrochemistry of multiple releases of chlorinated solvents at a former industrial site

    Science.gov (United States)

    Balouet, Jean Christophe; Burken, Joel G.; Karg, Frank; Vroblesky, Don; Smith, Kevin T.; Grudd, Hakan; Rindby, Anders; Beaujard, Francois; Chalot, Michel

    2012-01-01

    Trees can take up and assimilate contaminants from the soil, subsurface, and groundwater. Contaminants in the transpiration stream can become bound or incorporated into the annual rings formed in trees of the temperate zones. The chemical analysis of precisely dated tree rings, called dendrochemistry, can be used to interpret past plant interactions with contaminants. This investigation demonstrates that dendrochemistry can be used to generate historical scenarios of past contamination of groundwater by chlorinated solvents at a site in Verl, Germany. Increment cores from trees at the Verl site were collected and analyzed by energy-dispersive X-ray fluorescence (EDXRF) line scanning. The EDXRF profiles showed four to six time periods where tree rings had anomalously high concentrations of chlorine (Cl) as an indicator of potential contamination by chlorinated solvents.

  19. Comparison of the regulatory models assessing off-site radiological dose due to the routine releases of tritium

    International Nuclear Information System (INIS)

    Hwang, W. T.; Kim, E. H.; Han, M. H.; Choi, Y. H.; Lee, H. S.; Lee, C. W.

    2005-01-01

    Methodologies of NEWTRIT model, NRC model and AIRDOS-EPA model, which are off-site dose assessment models for regulatory compliance from routine releases of tritium into the environment, were investigated. Using the domestic data, if available, the predictive results of the models were compared. Among them, recently developed NEWTRIT model considers only doses from organically bounded tritium (OBT) due to environmental releases of tritiated water (HTO). A total dose from all exposure pathways predicted from AIRDOS-EPA model was 1.03 and 2.46 times higher than that from NEWTRIT model and NRC model, respectively. From above result, readers should not have an understanding that a predictive dose from NRC model may be underestimated compared with a realistic dose. It is because of that both mathematical models and corresponding parameter values for regulatory compliance are based on the conservative assumptions. For a dose by food consumption predicted from NEWTRIT model, the contribution of OBT was nearly equivalent to that of HTO due to relatively high consumption of grains in Korean. Although a total dose predicted from NEWTRIT model is similar to that from AIRDOS-EPA model, NEWTRIT model may be have a meaning in the understanding of phenomena for the behavior of HTO released into the environment

  20. Structure of eEF3 and the mechanism of transfer RNA release from the E-site

    DEFF Research Database (Denmark)

    Andersen, Christian Brix Folsted; Becker, T.; Blau, M.

    2006-01-01

    Elongation factor eEF3 is an ATPase, which, in addition to the two canonical factors eEF1A and eEF2, serves an essential function in the translation cycle of fungi. eEF3 is required for the binding of the aatRNA-eEF1A-GTP ternary complex to the ribosomal A-site and has been suggested to facilitate...... the clearance of deacyl-tRNA from the E-site. Here, we present the crystal structure of eEF3 showing that it consists of an N-terminal HEAT repeat domain, followed by a four-helix bundle and two ABC-type ATPase domains with a chromo-domain inserted in ABC2. Moreover, we present the cryo-EM structure of the ATP......-bound form of eEF3 in complex with the post-translocational state 80S ribosome from yeast. eEF3 uses an entirely new factor binding site near the ribosomal E-site, with the chromodomain stabilizing the ribosomal L1 stalk in an open conformation, thus, allowing tRNA release....

  1. Structures of Bordered Pits Potentially Contributing to Isolation of a Refilled Vessel from Negative Xylem Pressure in Stems of Morus australis Poir.: Testing of the Pit Membrane Osmosis and Pit Valve Hypotheses.

    Science.gov (United States)

    Ooeda, Hiroki; Terashima, Ichiro; Taneda, Haruhiko

    2017-02-01

    Two hypotheses have been proposed to explain the mechanism preventing the refilling vessel water from being drained to the neighboring functional vessels under negative pressure. The pit membrane osmosis hypothesis proposes that the xylem parenchyma cells release polysaccharides that are impermeable to the intervessel pit membranes into the refilling vessel; this osmotically counteracts the negative pressure, thereby allowing the vessel to refill. The pit valve hypothesis proposes that gas trapped within intervessel bordered pits isolates the refilling vessel water from the surrounding functional vessels. Here, using the single-vessel method, we assessed these hypotheses in shoots of mulberry (Morus australis Poir.). First, we confirmed the occurrence of xylem refilling under negative pressure in the potted mulberry saplings. To examine the pit membrane osmosis hypothesis, we estimated the semi-permeability of pit membranes for molecules of various sizes and found that the pit membranes were not semi-permeable to polyethylene glycol of molecular mass osmosis mechanism in mulberry would be unrealistically large. © The Author 2016. Published by Oxford University Press on behalf of Japanese Society of Plant Physiologists. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  2. Data Release Report for Source Physics Experiment 1 (SPE-1), Nevada National Security Site

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, Margaret [NSTec; Mercadente, Jennifer [NSTec

    2014-04-28

    The first Source Physics Experiment shot (SPE-1) was conducted in May 2011. The explosive source was a ~100-kilogram TNT-equivalent chemical set at a depth of 60 meters. It was recorded by an extensive set of instrumentation that includes sensors both at near-field (less than 100 meters) and far-field (more than 100 meters) distances. The near-field instruments consisted of three-component accelerometers deployed in boreholes around the shot and a set of singlecomponent vertical accelerometers on the surface. The far-field network comprised a variety of seismic and acoustic sensors, including short-period geophones, broadband seismometers, three-component accelerometers, and rotational seismometers at distances of 100 meters to 25 kilometers. This report coincides with the release of these data for analysts and organizations that are not participants in this program. This report describes the first Source Physics Experiment and the various types of near-field and far-field data that are available.

  3. Determination of safe radioactive releases to the atmosphere from the nuclear power site, Dynefontein

    International Nuclear Information System (INIS)

    Basson, J.K.; Van As, D.

    1976-01-01

    South Africa's first nuclear power station, Koeberg A, is to be built by Escom at Dynefontein, 28 km north of Cape Town, and the experience gained at the National Nuclear Research Centre, Pelindaba, has been used by the AEB as basis for the pre-operational investigation. The capacity of the environment to accept airborne radioactive effluent safely depends on various local factors such as dispersion conditions, the ecology, the habits of the local population and the accumulation, through critical pathways, of pertinent radionuclides. Long-term average dilution factors at varying distances from a 100m stack have been calculated by ESCOM from mesometeorological data collected by the CSIR. On the basis of available data, permissible release rates are derived for radioisotopes of the noble gases (critical pathway:external cloud exposure), 131 I, 137 Cs, 106 Ru, 125 Sb and 114 Ce and tritium. Although final confirmation of these values can only be obtained after operation, such a pre-operational survey may serve as an example to conventional industry [af

  4. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  5. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  6. Cormorant predation on PIT-tagged lake fish

    DEFF Research Database (Denmark)

    Skov, Christian; Jepsen, Niels; Baktoft, Henrik

    2014-01-01

    The present study use data from recovered PIT (Passive Integrated Transponder) tags to explore species-and size-specific annual predation rates by cormorants on three common lacustrine fishes (size range 120-367 mm) in a European lake; roach (Rutilus rutilus), common bream (Abramis brama) and perch...... (Perca fluviatilis). In addition, we quantify the level of age/size truncation that cormorant predation could introduce in a population of perch, an important fish for recreational angling as well as for trophic interactions and ecosystem function in European lakes. Based on three years of PIT tagging...... of fish in Lake Viborg and subsequent recoveries of PIT tags from nearby cormorant roosting and breeding sites, we show that cormorants are major predators of roach, bream and perch within the size groups we investigated and for all species larger individuals had higher predation rates. Perch appear...

  7. Open pit mining of uranium

    International Nuclear Information System (INIS)

    Wood, J.T.

    1977-01-01

    The Jackpile--Paquate Mines of the Anaconda Company are on the Laguna Indian Reservation midway between Grants and Albuquerque, New Mexico. The open pit mining of uranium ore at those mines is conducted in three separate operations (stripping, mining, and ore haul)

  8. The role of clearance in Germany - release of materials, buildings and sites

    International Nuclear Information System (INIS)

    Thierfeldt, S.

    2005-01-01

    Clearance in Germany is far advanced. A complex regulatory framework exists in the Radiation Protection Ordinance (RPO/Strahlenschutzverordnung, StrlSchV) since 2001 which has replaced previous recommendations on clearance issued by the German Radiation Protection Commission (Strahlenschutzkommission, SSK). A number of options exist both for unconditional clearance (e.g. of all kinds of materials with no restrictions on the destination or future use) and for clearance for a specific purpose (e.g. recycling of metal scrap). For each clearance option there is a set of nuclide specific clearance levels which have been derived on the basis of the 10 Sv/a individual dose criterion using complex radiological models which are tailored to the respective material cycles (metal scrap, buildings, building rubble, waste for disposal, sites). The clearance levels have been thoroughly reviewed by the SSK. An extensive comparison to sets of clearance levels used in other countries or issued as guidance by international bodies revealed that the correspondence between values is between good and acceptable taking into account country-specific approaches and special assumptions which would not necessarily pertain to German situations. Clearance is a major factor in the material management, especially of nuclear installations undergoing decommissioning. The variety of clearance options leaves the operator of a nuclear installation sufficient flexibility for optimisation of the material management. Clearance is of particular importance in a country like Germany where the estimated costs for a future repository are very high and the interim storage facilities for radioactive material are limited and costly. While the licensee is responsible for his material management, the issuance of a clearance permit is done by the regulatory body upon application. The regulators may choose to use the clearance levels and regulations as stipulated by the RPO, or to impose site-specific regulations on

  9. Experimental Stress Analysis at Railway Inspection Pit

    Directory of Open Access Journals (Sweden)

    Nicuşor Laurentiu Zaharia

    2008-10-01

    Full Text Available Railway inspection pits are used in railway halls. The purpose of inspection pits is to allow the working under the vehicle. Inspection pits can be found in locomotive depots, factories etc. The new design for a inspection pit in a railway hall involve tests in purpose of homologations the railway infrastructure. Before the homologation committee meeting, tests are made; after the test, a testing report is made which it will be part at homologation documents.

  10. Rapid release of 42K or 86Rb from two distinct transport sites on the Na,K-pump in the presence of Pi or vanadate

    International Nuclear Information System (INIS)

    Forbush, B. III

    1987-01-01

    The rate of 86Rb or 42 K release from an occluded form of the phosphorylated Na+ pump has been studied using a rapid filtration apparatus described previously. The rate constant of release is 5-15 s-1, and 42 K and 86Rb dissociate at approximately the same rate. Mg2+ is required for deocclusion in the presence of Pi at a site which has the same affinity as the site involved in stabilization of E2(K) with ATP; we propose that Na,K-ATPase has only one site for Mg2+, that the affinity of this site for Mg2+ is increased by Pi binding and decreased by ATP binding, and that Mg2+ is bound and released in the normal transport cycle. In the presence of K+, Cs+, Rb+, or Tl+, the release of two distinct 86Rb ions can be observed, the slow release from one site (''s'' site) being blocked by occupancy of the site vacated by the other (''f'', fast site). By a sequence of incubations, labeled 86Rb can be placed at either site, and the rate of dissociation monitored individually; in the absence of K+, dissociation from the s site proceeds after a lag in which the f site is vacated. The results are consistent with a ''flickering-gate'' model of deocclusion to the extracellular pump face, in which the site is exposed to the medium only long enough for a single ion to be released. When deocclusion to the intracellular face is promoted with ATP, ions are released from both sites at the same rate, presumably because the E2----E1 conformational change is rate-limiting. Unlabeled ions co-occluded with 86Rb increase the ATP-stimulated rate of release in the order Rb+ less than Tl+ less than Cs+ less than K+; since the same rank order is observed when dissociation from the s site is monitored in the presence of these ions and MgPi we propose that the latter process proceeds toward the intracellular pump face

  11. Secretagogue stimulation of neurosecretory cells elicits filopodial extensions uncovering new functional release sites.

    Science.gov (United States)

    Papadopulos, Andreas; Martin, Sally; Tomatis, Vanesa M; Gormal, Rachel S; Meunier, Frederic A

    2013-12-04

    Regulated exocytosis in neurosecretory cells relies on the timely fusion of secretory granules (SGs) with the plasma membrane. Secretagogue stimulation leads to an enlargement of the cell footprint (surface area in contact with the coverslip), an effect previously attributed to exocytic fusion of SGs with the plasma membrane. Using total internal reflection fluorescence microscopy, we reveal the formation of filopodia-like structures in bovine chromaffin and PC12 cells driving the footprint expansion, suggesting the involvement of cortical actin network remodeling in this process. Using exocytosis-incompetent PC12 cells, we demonstrate that footprint enlargement is largely independent of SG fusion, suggesting that vesicular exocytic fusion plays a relatively minor role in filopodial expansion. The footprint periphery, including filopodia, undergoes extensive F-actin remodeling, an effect abolished by the actomyosin inhibitors cytochalasin D and blebbistatin. Imaging of both Lifeact-GFP and the SG marker protein neuropeptide Y-mCherry reveals that SGs actively translocate along newly forming actin tracks before undergoing fusion. Together, these data demonstrate that neurosecretory cells regulate the number of SGs undergoing exocytosis during sustained stimulation by controlling vesicular mobilization and translocation to the plasma membrane through actin remodeling. Such remodeling facilitates the de novo formation of fusion sites.

  12. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0 with ROTC 1

    International Nuclear Information System (INIS)

    Boehlecke, Robert

    2004-01-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 322 is comprised of the following corrective action sites (CASs): (1) 01-25-01 - AST Release Site; (2) 03-25-03 - Mud Plant and AST Diesel Release; and (3) 03-20-05 - Injection Wells and BOP Shop. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for each CAS within CAU 322. Corrective action investigation activities were performed from April 2004 through September 2004, as set forth in the Corrective Action Investigation Plan. The purposes of the activities as defined during the data quality objectives process were: (1) Determine if contaminants of concern (COCs) are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to recommend appropriate corrective actions for the CASs. Analytes detected during the corrective action investigation were evaluated against appropriate preliminary action levels to identify contaminants of concern for each corrective action site. Radiological field measurements were compared to unrestricted release criteria. Assessment of the data generated from investigation activities revealed the following: (1) CAS 01-25-01 contains an AST berm contaminated with total petroleum hydrocarbons (TPH) diesel-range organics (DRO). (2) CAS 03-25-03 includes two distinct areas: Area A where no contamination remains from a potential spill associated with an AST, and Area B where TPH-DRO contamination associated with various activities at the mud plant was identified. The Area B contamination was found at various locations and depths. (3) CAS 03-25-03 Area B contains TPH-DRO contamination at various locations and

  13. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0 with ROTC 1

    Energy Technology Data Exchange (ETDEWEB)

    Boehlecke, Robert

    2004-12-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 322 is comprised of the following corrective action sites (CASs): (1) 01-25-01 - AST Release Site; (2) 03-25-03 - Mud Plant and AST Diesel Release; and (3) 03-20-05 - Injection Wells and BOP Shop. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for each CAS within CAU 322. Corrective action investigation activities were performed from April 2004 through September 2004, as set forth in the Corrective Action Investigation Plan. The purposes of the activities as defined during the data quality objectives process were: (1) Determine if contaminants of concern (COCs) are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to recommend appropriate corrective actions for the CASs. Analytes detected during the corrective action investigation were evaluated against appropriate preliminary action levels to identify contaminants of concern for each corrective action site. Radiological field measurements were compared to unrestricted release criteria. Assessment of the data generated from investigation activities revealed the following: (1) CAS 01-25-01 contains an AST berm contaminated with total petroleum hydrocarbons (TPH) diesel-range organics (DRO). (2) CAS 03-25-03 includes two distinct areas: Area A where no contamination remains from a potential spill associated with an AST, and Area B where TPH-DRO contamination associated with various activities at the mud plant was identified. The Area B contamination was found at various locations and depths. (3) CAS 03-25-03 Area B contains TPH-DRO contamination at various

  14. Groundwater flow analysis and dose rate estimates from releases to wells at a coastal site

    Energy Technology Data Exchange (ETDEWEB)

    Kattilakoski, E.; Suolanen, V. [VTT Energy, Espoo (Finland)

    2000-09-01

    {sup 3}/a. Due to the placing of the shallow wells in the discharge areas, the dilution calculated in the shallow well was shown to be close to that calculated in the deep well. In conservative considerations the value around 90 000 m{sup 3}/a can be regarded as a representative expectation value of the effective dilution of the well. This dilution volume value was also suggested by the most realistic modelling approach of the groundwater flow analysis. It was used as basis when calculating the nuclide specific dose conversion factors (DCF's) for the drinking water pathway. The DCF's were calculated for unit release rates (1 Bq/a) and the assumed water consumption rate was 2 litres/day. (orig.)

  15. Direct measurement of human plasma corticotropin-releasing hormone by two-site immunoradiometric assay

    International Nuclear Information System (INIS)

    Linton, E.A.; McLean, C.; Nieuwenhuyzen Kruseman, A.C.; Tilders, F.J.; Van der Veen, E.A.; Lowry, P.J.

    1987-01-01

    A ''two-site'' immunoradiometric assay (IRMA) which allows the direct estimation of human CRH (hCRH) in plasma is described. Using this IRMA, basal levels of CRH in normal subjects ranged from 2-28 pg/mL [mean, 15 +/- 7 (+/- SD) pg/mL; n = 58]. Values in men and women were similar. Plasma CRH values within this range were also found in patients with Cushing's syndrome, Addison's disease, and Nelson's syndrome, with no correlation between plasma CRH and ACTH levels in these patients. Elevated plasma CRH levels were found in pregnant women near term [1462 +/- 752 (+/- SD) pg/mL; n = 55], and the dilution curve of this CRH-like immunoreactivity paralleled the IRMA standard curve. After its immunoadsorption from maternal plasma, this CRH-like material eluted on reverse phase high performance liquid chromatography with a retention time identical to that of synthetic CRH and had equipotent bioactivity with the synthetic peptide in the perfused anterior pituitary cell bioassay. Circulating CRH was not detected in Wistar rats, even after adrenalectomy and subsequent ether stress. Synthetic hCRH was degraded by fresh human plasma relatively slowly; 65% of added CRH remained after 1 h of incubation at 37 C. Degradation was inhibited by heat treatment (54 C; 1 h), cold treatment (4 C; 4 h), or freezing and thawing. Loss of synthetic rat CRH occurred more rapidly when fresh rat plasma was used; only 20% of added CRH remained under the same conditions. The inability to measure CRH in peripheral rat plasma may be due to the presence of active CRH-degrading enzymes which fragment the CRH molecule into forms not recognized by the CRH IRMA

  16. Hanford Site 100-N Area In Situ Bioremediation of UPR-100-N-17, Deep Petroleum Unplanned Release - 13245

    Energy Technology Data Exchange (ETDEWEB)

    Saueressig, Daniel G. [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

    2013-07-01

    In 1965 and 1966, approximately 303 m{sup 3} of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates as an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)

  17. Hanford Site 100-N Area In Situ Bioremediation of UPR-100-N-17, Deep Petroleum Unplanned Release - 13245

    International Nuclear Information System (INIS)

    Saueressig, Daniel G.

    2013-01-01

    In 1965 and 1966, approximately 303 m 3 of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates as an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)

  18. Program plan for evaluation and remediation of the generation and release of flammable gases in Hanford Site waste tanks

    International Nuclear Information System (INIS)

    Johnson, G.D.

    1991-08-01

    This program plan describes the activities being conducted for the resolution of the flammable gas problem that is associated with 23 high-level waste tanks at the Hanford Site. The classification of the wastes in all of these tanks is not final and some wastes may not be high-level wastes. However, until the characterization and classification is complete, all the tanks are treated as if they contain high-level waste. Of the 23 tanks, Tank 241-SY-101 (referred to as Tank 101-SY) has exhibited significant episodic releases of flammable gases (hydrogen and nitrous oxide) for the past 10 years. The major near-term focus of this program is for the understanding and stabilization of this tank. An understanding of the mechanism for gas generation and the processes for the episodic release will be obtained through sampling of the tank contents, laboratory studies, and modeling of the tank behavior. Additional information will be obtained through new and upgraded instrumentation for the tank. A number of remediation, or stabilization, concepts will be evaluated for near-term (2 to 3 years) applications to Tank 101-SY. Detailed safety assessments are required for all activities that will occur in the tank (sampling, removal of equipment, and addition of new instruments). This program plan presents a discussion of each task, provides schedules for near-term activities, and gives a summary of the expected work for fiscal years 1991, 1992, and 1993. 16 refs., 7 figs., 8 tabs

  19. Program plan for evaluation and remediation of the generation and release of flammable gases in Hanford Site waste tanks

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.D. (comp.)

    1991-08-01

    This program plan describes the activities being conducted for the resolution of the flammable gas problem that is associated with 23 high-level waste tanks at the Hanford Site. The classification of the wastes in all of these tanks is not final and some wastes may not be high-level wastes. However, until the characterization and classification is complete, all the tanks are treated as if they contain high-level waste. Of the 23 tanks, Tank 241-SY-101 (referred to as Tank 101-SY) has exhibited significant episodic releases of flammable gases (hydrogen and nitrous oxide) for the past 10 years. The major near-term focus of this program is for the understanding and stabilization of this tank. An understanding of the mechanism for gas generation and the processes for the episodic release will be obtained through sampling of the tank contents, laboratory studies, and modeling of the tank behavior. Additional information will be obtained through new and upgraded instrumentation for the tank. A number of remediation, or stabilization, concepts will be evaluated for near-term (2 to 3 years) applications to Tank 101-SY. Detailed safety assessments are required for all activities that will occur in the tank (sampling, removal of equipment, and addition of new instruments). This program plan presents a discussion of each task, provides schedules for near-term activities, and gives a summary of the expected work for fiscal years 1991, 1992, and 1993. 16 refs., 7 figs., 8 tabs.

  20. MARSSIM guidelines for non-impacted area identification in support of partial site release prior to license termination

    International Nuclear Information System (INIS)

    Parish, D.

    1999-01-01

    Regulations are in place which allow plants undergoing decommissioning to remove obsolete requirements from their licenses. Large buffer areas to the site boundary, needed for emergency planning purposes during power operation, are not required for permanently defueled facilities. It is important that non-impacted areas be removed from license restrictions as soon as possible post shutdown to allow rapid asset recovery and return the large environmental resources these areas represent to beneficial use. License termination surveys are not required for non-impacted areas in accordance with the guidance of US Nuclear Regulatory Commission (NRC) NUREG-1575 (MARSSIM), and NRC Draft Regulatory Guide DG-4006. Thus, such areas do not fall under the license termination requirements of 10CFR50.82 (US Code of Federal Regulations). This report describes methods of classifying areas as non-impacted in accordance with MARRSIM and other NRC guidance, and the licensing options for release of non-impacted areas prior to license termination. The status of Big Rock Point's efforts toward early release of non-impacted areas also is provided. (author)

  1. Hypothesis of a nuclear accident to the nuclear power plant of Gravelines with important radioactive release out of the site: risks prevention, intervention strategies. Evaluation of the sensitization to the nuclear risk of the physician practicing near the site

    International Nuclear Information System (INIS)

    Mraovic, Th.

    1998-01-01

    This thesis has for hypothesis a nuclear accident at the nuclear power plant of Gravelines with radioactive release out of the site: the risks prevention and the strategies of intervention are studied. An evaluation of the sensitization to a nuclear risk is made for the general practitioner that practices near the site. (N.C.)

  2. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XIII; Appraisal of System-Wide Survival Estimation of Snake River Yearling Chinook Salmon Released in 1997 and 1988, Using PIT-Tags Recovered from Caspian Tern and Double-Crested Cormorant Breeding Colonies on Rice Island, 1997-1998 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Perez-Comas, Jose A. (University of Washington, School of Fisheries, Seattle, WA)

    2000-05-01

    PIT-tags recovered from tern and cormorant breeding colonies at Rice Island and observations from the interrogation systems at John Day and Bonneville Dams were incorporated into survival analyses. Whether the estimates for the upper reaches of the system, between Lower Granite and McNary Dams were as expected (with weighted averages S{sub LGR-LGS} = 0.996, S{sub LGS-LMN} = 0.837, and S{sub LMN-McN} = 0.941), those for the lower reaches, between John Day and Bonneville Dams, appeared positively biased with survival estimates typically greater than 1. Their weighted averages were S{sub McN-JDA} = 0.707 and S{sub JDA-BON} = 1.792 for 1997 releases. For the 1998 releases, they were S{sub McN-JDA} = 0.795 and S{sub JDA-BON} = 1.312. If the estimates for the lower reaches were biased, the estimates for the whole project would also be biased (S{sub LGR-BON} = 0.819). We determined that bias could have arisen if the terns and cormorants of Rice Island fished for salmon yearlings in waters of the BON-Rice reach at low rates (M{sub BON-Rice} {le} 0.2), and the rates of tag-deposition and tag-detection were low (R{sub D} x R{sub R} {le} 0.4). Moreover, unknown levels of uncensored post-detection mortality and scavenging of previously dead salmon yearlings may have also added to the bias.

  3. Calcium Occupancy of N-terminal Sites within Calmodulin Induces Inhibition of the Ryanodine Receptor Calcium Release Channel

    Energy Technology Data Exchange (ETDEWEB)

    Boschek, Curt B; Jones, Terry E; Squier, Thomas C; Bigelow, Diana J

    2007-08-01

    Calmodulin (CaM) regulates calcium release from intracellular stores in skeletal muscle through its association with the ryanodine receptor (RyR1) calcium release channel, where CaM association enhances channel opening at resting calcium levels and its closing at micromolar calcium levels associated with muscle contraction. A high-affinity CaM-binding sequence (RyRp) has been identified in RyR1, which corresponds to a 30-residue sequence (i.e., K3614 – N3643) located within the central portion of the primary sequence. However, it is currently unclear whether the identified CaM-binding sequence a) senses calcium over the physiological range of calcium-concentrations associated with RyR1 regulation or b) plays a structural role unrelated to the calcium-dependent modulation of RyR1 function. Therefore, we have measured the calcium-dependent activation of the individual domains of CaM in association with RyRp and their relationship to the CaM-dependent regulation of RyR1. These measurements utilize an engineered CaM, permitting the site-specific incorporation of N-(1-pyrene) maleimide at either T34C (PyN-CaM) or T110C (PyC-CaM) in the N- and C-domains, respectively. Consistent with prior measurements, we observe a high-affinity association between both apo- and calcium-activated CaM and RyRp. Upon association with RyRp, fluorescence changes in PyN-CaM or PyC-CaM permit the measurement of the calcium-activation of these individual domains. Fluorescence changes upon calcium-activation of PyC-CaM in association with RyRp are indicative of high-affinity calcium-dependent activation of the C-terminal domain of CaM bound to RyRp at resting calcium levels and the activation of the N-terminal domain at levels of calcium associated cellular activation. In comparison, occupancy of calcium-binding sites in the N-domain of CaM mirrors the calcium-dependence of RyR1 inhibition observed at activating calcium levels, where [Ca]1/2 = 4.3 0.4 μM, suggesting a direct regulation of Ry

  4. Evaluation of water chemistry on the pitting susceptibility of aluminum

    International Nuclear Information System (INIS)

    Chandler, G.T.; Sindelar, R.L.; Lam, P.S.

    1997-01-01

    Aluminum-clad spent nuclear fuels are being stored in water in the Receiving Basin for Off-site Fuels (RBOF) and the reactor disassembly (cooling) basins at the Savannah River Site (SRS). Experience shows that fuels stored in water are subject to rapid pitting corrosion if the water quality is poor. Upgrade projects and actions, including those to improve water quality, were recently undertaken to upgrade the disassembly basins for extended storage. A technical strategy was developed for continued basin storage of aluminum-clad fuel assemblies. The strategy includes development and implementation of basin technical standards for water quality to minimize attack due to pitting corrosion over a desired storage period. In the absence of localized corrosion, only slow, general corrosion of the cladding would be expected. A laboratory corrosion program is being performed to provide the bases for technical standards by identifying the region of aggressive water qualities where existing oxide films would tend to break down and pits would initiate and remain active. Initial results from corrosion potential and cyclic polarization testing of aluminum alloys in various water chemistries have shown that low conductivity water (< 50 μS/cm) should not be aggressive to cause self-pitting corrosion. Initial results from tests of 8001 and 5052 aluminum and aluminium-10% uranium alloy indicate that a strong galvanic couple should not exist between the aluminum cladding materials and the aluminum-uranium fuel. Additional laboratory testing will include immersion testing to allow characterization of the growth rate of active pits to benchmark a kinetic model. This model will form the basis for a water quality technical standard and enable prediction of the life of aluminum-clad spent nuclear fuels in basin storage

  5. A site study of the multiple effects of thermal releases on the aquatic life in an estuarine area

    International Nuclear Information System (INIS)

    Borgese, D.; Dinelli, G.; Guzzi, L.; Smedile, E.

    1975-01-01

    The estuarine area of a river represents a typical site where different factors have to be considered when trying to assess the actual impact on the aquatic life of industrial thermal releases. These factors may be physical (river flow, sea currents, tides, residence time of waters in marshes and lagoons), biological (bio-mass production, mutual organic matter exchange between fresh and sea waters) and economic such as the commercial importance of fishing. In this respect the siting of a large power station in the Po river delta may cause serious problems for the conservation of the existing ecosystem. Thus a multidisciplinary approach with a view to predicting the final thermal impact of a power station on the environment seems fully justified despite its complexity. Therefore a detailed research programme has been established in order to study the following main points: (a) structure of the plant and animal populations; (b) primary production and bacterial activity; (c) physical and chemical characteristics of estuarine waters; (d) coastal characterization; (e) thermal effects on the biocenosis entering the condenser of existing plants operating under similar conditions. Together with conventional experimental techniques, airborne infra-red (IR) and multi-spectra (MS) surveys are planned as, according to preliminary investigations, they provide essential information for the recognition of water flow patterns and aquatic plant growth. The behaviour of the particular ecosystem will be simulated using mathematical models defined on a system theory approach, where the descriptive functions and rate constants come from experimental studies conducted in situ and with laboratory tests. In fact results of preliminary airborne scanning IR and MS surveys combined with biological studies confirm the need for systematic research on the Po river delta. (author)

  6. Cause of pitting in beryllium

    International Nuclear Information System (INIS)

    Kershaw, R.P.

    1982-01-01

    Light microscopy, bare-film radiography, secondary ion mass spectroscopy, electron microprobe and physical testing were used to examine beryllium specimens exhibiting a stratified, pitted, pattern after chemical milling. The objective was to find the cause of this pattern. Specimens were found to have voids in excess of density specification allowances. These voids are attributed, at least in part, to the sublimation of beryllium fluoride during the vacuum hot pressing operation. The origin of the pattern is attributed to these voids and etching out of fines and associated impurities. Hot isostatic pressing with a subsequent heat treatment close residual porosity and dispersed impurities enough to correct the problem

  7. Post-pit optimization strategic alignment

    OpenAIRE

    Breed, M.F.; van Heerden, D.

    2016-01-01

    Successful development of projects or life-of-mine strategies requires an understanding of the relative sensitivity of value drivers such as grade, tonnage, energy costs, direct operational costs, and recoveries. For example, the results could vary significantly depending on the grade strategy, given a specific orebody amenable to open pitting. Pit optimization is a very powerful tool widely used in the industry to determine the pit shell with the most attractive value potential. Based on the...

  8. Computer simulation of pitting potential measurements

    International Nuclear Information System (INIS)

    Laycock, N.J.; Noh, J.S.; White, S.P.; Krouse, D.P.

    2005-01-01

    A deterministic model for the growth of single pits in stainless steel has been combined with a purely stochastic model of pit nucleation. Monte-Carlo simulations have been used to compare the predictions of this model with potentiodynamic experimental measurements of the pitting potential. The quantitative agreement between model and experiment is reasonable for both 304 and 316 stainless steel, and the effects of varying surface roughness, solution chloride concentration and potential sweep rate have been considered

  9. Spontaneous Resolution of Optic Disc Pit Maculopathy

    OpenAIRE

    Tripathy, Koushik

    2017-01-01

    I read with interest the article reporting spontaneous resolution of optic disc pit maculopathy in a boy.1 Though the presence of an optic disc pit and associated macular involvement is undoubted in the presented case, the provided optical coherence tomography (OCT) does not clearly show typical intraretinal schisis (Figure 1B)1 at multiple retinal levels which may communicate with the pit. Instead, it shows a sub-internal limiting membrane (sub-ILM) cavity. Such cavities are known to occur f...

  10. Impacts of swine manure pits on groundwater quality

    International Nuclear Information System (INIS)

    Krapac, I.G.; Dey, W.S.; Roy, W.R.; Smyth, C.A.; Storment, E.; Sargent, S.L.; Steele, J.D.

    2002-01-01

    New information is presented on impacts on groundwater by manure storage in deep ground pits. - Manure deep-pits are commonly used to store manure at confined animal feeding operations. However, previous to this study little information had been collected on the impacts of deep-pits on groundwater quality to provide science-based guidance in formulating regulations and waste management strategies that address risks to human health and the environment. Groundwater quality has been monitored since January 1999 at two hog finishing facilities in Illinois that use deep-pit systems for manure storage. Groundwater samples were collected on a monthly basis and analyzed for inorganic and bacteriological constituent concentrations. The two sites are located in areas with geologic environments representing different vulnerabilities for local groundwater contamination. One site is underlain by more than 6 m of clayey silt, and 7-36 m of shale. Concentrations of chloride, ammonium, phosphate, and potassium indicated that local groundwater quality had not been significantly impacted by pit leakage from this facility. Nitrate concentrations were elevated near the pit, often exceeding the 10 mg N/l drinking water standard. Isotopic nitrate signatures suggested that the nitrate was likely derived from soil organic matter and fertilizer applied to adjacent crop fields. At the other site, sandstone is located 4.6-6.1 m below land surface. Chloride concentrations and δ 15 N and δ 18 O values of dissolved nitrate indicated that this facility may have limited and localized impacts on groundwater. Other constituents, including ammonia, potassium, phosphate, and sodium were generally at or less than background concentrations. Trace- and heavy-metal concentrations in groundwater samples collected from both facilities were at concentrations less than drinking water standards. The concentration of inorganic constituents in the groundwater would not likely impact human health. Fecal

  11. Impacts of swine manure pits on groundwater quality

    Energy Technology Data Exchange (ETDEWEB)

    Krapac, I.G.; Dey, W.S.; Roy, W.R.; Smyth, C.A.; Storment, E.; Sargent, S.L.; Steele, J.D

    2002-12-01

    New information is presented on impacts on groundwater by manure storage in deep ground pits. - Manure deep-pits are commonly used to store manure at confined animal feeding operations. However, previous to this study little information had been collected on the impacts of deep-pits on groundwater quality to provide science-based guidance in formulating regulations and waste management strategies that address risks to human health and the environment. Groundwater quality has been monitored since January 1999 at two hog finishing facilities in Illinois that use deep-pit systems for manure storage. Groundwater samples were collected on a monthly basis and analyzed for inorganic and bacteriological constituent concentrations. The two sites are located in areas with geologic environments representing different vulnerabilities for local groundwater contamination. One site is underlain by more than 6 m of clayey silt, and 7-36 m of shale. Concentrations of chloride, ammonium, phosphate, and potassium indicated that local groundwater quality had not been significantly impacted by pit leakage from this facility. Nitrate concentrations were elevated near the pit, often exceeding the 10 mg N/l drinking water standard. Isotopic nitrate signatures suggested that the nitrate was likely derived from soil organic matter and fertilizer applied to adjacent crop fields. At the other site, sandstone is located 4.6-6.1 m below land surface. Chloride concentrations and {delta}{sup 15}N and {delta}{sup 18}O values of dissolved nitrate indicated that this facility may have limited and localized impacts on groundwater. Other constituents, including ammonia, potassium, phosphate, and sodium were generally at or less than background concentrations. Trace- and heavy-metal concentrations in groundwater samples collected from both facilities were at concentrations less than drinking water standards. The concentration of inorganic constituents in the groundwater would not likely impact human

  12. The pitting resistance of AISI 316 stainless steel passivated in diluted nitric acid

    International Nuclear Information System (INIS)

    Barbosa, M.A.

    1983-01-01

    The pitting resistance of AISI 316 stainless steel after passivation in diluted nitric acid was studied in comparison with that of non-passivated specimens. The passivation treatment increased the pitting potential but decreased the resistance to crevice corrosion under open circuit conditions in aerated sea water. Immersion in the nitric acid solution was found to remove the sulphide inclusions from the metal surface, thus eliminating the most susceptible sites for attack. In the absence of sulphide particles pitting nucleated at aluminium-rich oxides. (author)

  13. Lessons Learned from Pit Viper Integration into Hanford Tank Farm Reality

    International Nuclear Information System (INIS)

    Catalan, Michael A.; Bailey, Sharon A.; Alzheimer, James M.; Niebuhr, Daniel P.

    2002-01-01

    The Pit Viper is a tele-operated system intended to enhance worker safety while simultaneously improving the efficiency of pit operations at the Hanford Site. Commercial off-the-shelf (COTS) components were used in an attempt to increase system efficiency. During preparation for initial deployment, the Pit Viper team identified multiple areas where more advanced technology offers substantial improvement in system capabilities. The team also ensured that the system as is, was capable of fulfilling its mission. However, there are valid concerns of the reliability of the technology. Areas where improvement are desired include; operator feedback, manipulator dexterous envelope, and system reliability

  14. Management of Pit 9 - highlights of accomplishments and lessons learned to date

    International Nuclear Information System (INIS)

    Schwartz, F.G.

    1995-01-01

    The Pit 9 project is a U.S. Department of Energy prototype full scale demonstration to retrieve and treat buried mixed transuranic waste. The project is being managed by the DOE-Idaho Environmental Restoration Program, in conjunction with the Environmental Protection Agency Region 10 and the state of Idaho, under the Idaho National Engineering Laboratory Federal Facility Agreement and Consent Order. Pit 9 is located in the northeast corner of the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The Pit 9 project was conceived out of the need to determine capabilities to cost effectively retrieve and treat buried radioactive and radioactive mixed waste, and obtain characterization and contaminant migration data for buried waste at the INEL. Waste was disposed in Pit 9 from November 1967 to June 1969. Pit 9, at about 380 feet by 125 feet, represents approximately one acre of surface area of the 88 acre SDA. The pit contains approximately 350,000 ft 3 of soil beneath and between the buried waste and about 250,000 ft 3 of overburden soil. The average depth of the pit from soil surface to bedrock is approximately 17.5 feet. Approximately 110,000 ft 3 of transuranic (TRU) contaminated mixed wastes from Rocky Flats and approximately 40,000 ft 3 of low level and mixed wastes from the INEL were buried in Pit 9 during this period. Pit 9 is estimated to contain over 30,000 gallons of organics (over 30% of the total organic inventory in the SDA) and approximately 66 pounds of TRU radionuclides (between 3% and 4% of the total TRU inventory in the SDA). Pit 9 was selected as a demonstration site because it was one of the last disposal pits at the INEL to receive Rocky Flats waste, disposal records are better for Pit 9 than for disposal pits and trenches from earlier points in time, and the wastes in Pit 9 are representative of the wastes disposed in the SDA

  15. A study on safety concept and criteria of site release of nuclear installation proposed by international organizations and adopted in decommissioning practices

    International Nuclear Information System (INIS)

    Enokido, Yuji; Miyasaka, Yasuhiko; Ishikawa, Hironori

    2008-01-01

    Regulatory systems and safety criteria of site release of nuclear installation proposed by international organizations such as IAEA and applied in decommissioning in domestic and foreign countries have been studied, in order to avail them to deliberate the relevant domestic regulation and guides. In addition, the applicability of the proposal and practices to domestic legislation have been discussed. Regarding the national safety criteria, the annual individual dose constraint is optimized between 10 μSv and 300 μSv after recommendation and/or guides of IAEA etc. Unconditional release should be achieved, but the conditional and/or partial site release are possible under the same safety criteria to make the selection flexible for licensees. (author)

  16. Stand response of 16-year-old upland hardwood regeneration to crop-tree release on a medium quality site in the Southern Appalachians after 24 years

    Science.gov (United States)

    W. Henry. McNab

    2010-01-01

    A crop tree release was made in a 16-year-old upland hardwood stand on a medium-quality site using one of two treatments: mechanical or chemical. After 24 years there was no significant difference in stand response between the two treatments as measured by mean increase in stand diameter, basal area, total height, height to base of live...

  17. Speed, Acceleration, Chameleons and Cherry Pit Projectiles

    Science.gov (United States)

    Planinsic, Gorazd; Likar, Andrej

    2012-01-01

    The paper describes the mechanics of cherry pit projectiles and ends with showing the similarity between cherry pit launching and chameleon tongue projecting mechanisms. The whole story is written as an investigation, following steps that resemble those typically taken by scientists and can therefore serve as an illustration of scientific…

  18. Burning/Rubble Pits: Environmental information document

    International Nuclear Information System (INIS)

    Huber, L.A.; Johnson, W.F.; Marine, I.W.

    1987-03-01

    The Burning/Rubble Pits, located near each of the major operating areas at the Savannah River Plant (SRP), began collecting burnable waste in 1951. The waste was incinerated monthly. All Burning/Rubble Pits are currently closed except for Burning/Rubble Pit 131-1R, which has not been backfilled but is inactive. No soil cores from the Burning/Rubble Pits have been analyzed. There are four groundwater monitoring wells located around each of the pits, which have been sampled quarterly since 1984. The closure options considered for the Burning/Rubble Pits are waste removal and closure, no waste removal and closure, and no action. Modeling calculations were made to determine the risks to human population for the three postulated closure options. An ecological assessment was conducted to predict the environmental impacts on aquatic and terrestrial biota. The relative costs for each of the closure options were estimated. An evaluation of the environmental impacts from the Burning/Rubble Pits indicates that the relative risks to human health and ecosystems for the postulated closure options are low. The ecological assessment shows that the effects of any closure activities on river water quality and wildlife would be insignificant. The cost estimates show the waste removal and closure option to be the most expensive for all of the pits. 38 refs., 35 figs., 47 tabs

  19. Assessment of Westinghouse Hanford Company methods for estimating radionuclide release from ground disposal of waste water at the N Reactor sites

    International Nuclear Information System (INIS)

    1988-09-01

    This report summarizes the results of an independent assessment by Golder Associates, Inc. of the methods used by Westinghouse Hanford Company (Westinghouse Hanford) and its predecessors to estimate the annual offsite release of radionuclides from ground disposal of cooling and other process waters from the N Reactor at the Hanford Site. This assessment was performed by evaluating the present and past disposal practices and radionuclide migration data within the context of the hydrology, geology, and physical layout of the N Reactor disposal site. The conclusions and recommendations are based upon the available data and simple analytical calculations. Recommendations are provided for conducting more refined analyses and for continued field data collection in support of estimating annual offsite releases. Recommendations are also provided for simple operational and structural measures that should reduce the quantities of radionuclides leaving the site. 5 refs., 9 figs., 1 tab

  20. Estimation of the release and migration of nickel through soils and groundwater at the Hanford Site 218-E-12B Burial Ground

    International Nuclear Information System (INIS)

    Rhoads, K.; Bjornstad, B.N.; Lewis, R.E.

    1994-05-01

    An assessment was performed to evaluate release and transport of nickel from large metal components containing nickel-bearing alloys at the Hanford Site 218-E-12B Burial Ground. The potential for nickel within the components to enter groundwater under the burial site was investigated by examining available data on the site's geology, geochemistry, and geohydrology to develop a conceptual model for release and transport of nickel from the components. In addition, laboratory studies were performed to provide information needed for the model, but which was not available from existing databases. Estimates of future concentrations of nickel radioisotopes ( 59 Ni and 63 Ni) and total elemental nickel in the unconfined aquifer and in the Columbia River were developed based on this information

  1. Accountability Quality Shuffler Measurements on Pits

    International Nuclear Information System (INIS)

    Rinard, P.M.

    2000-01-01

    Pits have generally been treated as accountable units that are intact if merely present and they are excluded from the more demanding nondestructive assay requirements. As pits begin to flow into disposition streams, there may be more incentive to measure the masses of their fissile components for accountability purposes. This Department of Energy Office of Safeguards and Security (OSS) Lifecycle Project has explored some ways in which such measurements may be done successfully. The active neutron instrument called a shuffler has been used to measure a variety of actual pits, and a calculational technique has been developed to accurately predict such count rates. Passive multiplicity counting has previously been applied to pits for determining their plutonium contents. This combination of measurement and calculational techniques provide powerful and accurate tools for determining the fissile contents of pits with the quality needed for accountability purposes

  2. PIT 9 Project: A private sector initiative

    International Nuclear Information System (INIS)

    Macdonald, D.W.; Hughes, F.P.; Burton, B.N.

    1993-01-01

    The Pit 9 Comprehensive Demonstration is intended to demonstrate a cost-effective approach to remediate an Idaho National Engineering Lab. (INEL) waste disposal pit through a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Action. The remediation will include additional requirements, if needed, to provide high confidence that only minor additional work would be necessary to accomplish the final closure as part of the overall final closure strategy for the INEL's Subsurface Disposal Area (SDA). Pit 9 is an inactive waste disposal pit located in the northeastern corner of the SDA at the INEL's Radioactive Waste Management Complex (RWMC). It covers approximately 1 acre. The waste within Pit 9 is primarily transuranic waste generated at the Rocky Flats Plant and additional wastes, both hazardous and low-level radioactive, from generators at the INEL

  3. Pit closures - effects and alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Stott, A G

    1987-02-01

    During the last decade, British Coal has closed around 100 mines. This article illustrates the effect of pit closures on the colliery's workforce, and the local community and its economy. Working conditions at Newmarket Colliery and the Selby coalfield are compared within the context of British Coal's national transfer market. British Coal's transfer benefits include resettlement payments and mortgage subsidies. The job creation venture of British Coal Enterprise Ltd. has helped to create over 3700 new jobs in 264 projects, involving a total investment of 38 M pounds sterling. The article also discusses deputies' qualifications and prospects for recently qualified management staff, and gives a comparison of losses suffered by the different mining unions.

  4. Is Playing in the Pit Really the Pits?: Pain, Strength, Music Performance Anxiety, and Workplace Satisfaction in Professional Musicians in Stage, Pit, and Combined Stage/Pit Orchestras.

    Science.gov (United States)

    Kenny, Dianna T; Driscoll, Tim; Ackermann, Bronwen J

    2016-03-01

    Typically, Australian orchestral musicians perform on stage, in an orchestra pit, or in a combination of both workplaces. This study explored a range of physical and mental health indicators in musicians who played in these different orchestra types to ascertain whether orchestra environment was a risk factor affecting musician wellbeing. Participants comprised 380 full-time orchestral musicians from the eight major state orchestras in Australia comprised of two dedicated pit orchestras, three stage-only symphonic orchestras, and three mixed stage/pit orchestras. Participants completed a physical assessment and a range of self-report measures assessing performance-related musculoskeletal disorders (PRMD), physical characteristics including strength and perceived exertion, and psychological health, including music performance anxiety (MPA), workplace satisfaction, and bullying. Physical characteristics and performance-related musculoskeletal profiles were similar for most factors on the detailed survey completed by orchestra members. The exceptions were that pit musicians demonstrated greater shoulder and elbow strength, while mixed-workload orchestra musicians had greater flexibility Significantly more exertion was reported by pit musicians when rehearsing and performing. Stage/pit musicians reported less physical exertion when performing in the pit compared with performing on stage. Severity of MPA was significantly greater in pit musicians than mixed orchestra musicians. Pit musicians also reported more frequent bullying and lower job satisfaction compared with stage musicians. There were few differences in the objective physical measures between musicians in the different orchestra types. However, pit musicians appear more psychologically vulnerable and less satisfied with their work than musicians from the other two orchestra types. The physical and psychological characteristics of musicians who perform in different orchestra types have not been adequately

  5. Topical report on release scenario analysis of long-term management of high-level defense waste at the Hanford Site

    International Nuclear Information System (INIS)

    Wallace, R.W.; Landstrom, D.K.; Blair, S.C.; Howes, B.W.; Robkin, M.A.; Benson, G.L.; Reisenauer, A.E.; Walters, W.H.; Zimmerman, M.G.

    1980-11-01

    Potential release scenarios for the defense high-level waste (HLW) on the Hanford Site are presented. Presented in this report are the three components necessary for evaluating the various alternatives under consideration for long-term management of Hanford defense HLW: identification of scenarios and events which might directly or indirectly disrupt radionuclide containment barriers; geotransport calculations of waste migration through the site media; and consequence (dose) analyses based on groundwater and air pathways calculations. The scenarios described in this report provide the necessary parameters for radionuclide transport and consequence analysis. Scenarios are categorized as either bounding or nonbounding. Bounding scenarios consider worst case or what if situations where an actual and significant release of waste material to the environment would happen if the scenario were to occur. Bounding scenarios include both near-term and long-term scenarios. Near-term scenarios are events which occur at 100 years from 1990. Long term scenarios are potential events considered to occur at 1000 and 10,000 years from 1990. Nonbounding scenarios consider events which result in insignificant releases or no release at all to the environment. Three release mechanisms are described in this report: (1) direct exposure of waste to the biosphere by a defined sequence of events (scenario) such as human intrusion by drilling; (2) radionuclides contacting an unconfined aquifer through downward percolation of groundwater or a rising water table; and (3) cataclysmic or explosive release of radionuclides by such mechanisms as meteorite impact, fire and explosion, criticality, or seismic events. Scenarios in this report present ways in which these release mechanisms could occur at a waste management facility. The scenarios are applied to the two in-tank waste management alternatives: in-situ disposal and continued present action

  6. Evaluation through column leaching tests of metal release from contaminated estuarine sediment subject to CO2 leakages from Carbon Capture and Storage sites

    International Nuclear Information System (INIS)

    Payán, M. Cruz; Galan, Berta; Coz, Alberto; Vandecasteele, Carlo; Viguri, Javier R.

    2012-01-01

    The pH change and the release of organic matter and metals from sediment, due to the potential CO 2 acidified seawater leakages from a CCS (Carbon Capture and Storage) site are presented. Column leaching test is used to simulate a scenario where a flow of acidified seawater is in contact with recent contaminated sediment. The behavior of pH, dissolved organic carbon (DOC) and metals As, Cd, Cr, Cu, Ni, Pb, Zn, with liquid to solid (L/S) ratio and pH is analyzed. A stepwise strategy using empirical expressions and a geochemical model was conducted to fit experimental release concentrations. Despite the neutralization capacity of the seawater-carbonate rich sediment system, important acidification and releases are expected at local scale at lower pH. The obtained results would be relevant as a line of evidence input of CCS risk assessment, in an International context where strategies to mitigate the climate change would be applied. - Highlights: ► Tier structured approach for assessment of the release of metals from sediment. ► Standard column leaching test to simulate CO 2 acidified seawater CCS leakages. ► Metal and DOC release from marine sediment in contact to CO 2 acidified seawater. ► From empirical to geochemical modeling approaches of DOC and metals release in column tests. ► Contamination line of evidence input of CCS risk assessment. - Column metal release from CO 2 acidified seawater leakages in contact with estuarine contaminated sediment in CCS sites

  7. Biofouling and barnacle adhesion data for fouling-release coatings subjected to static immersion at seven marine sites

    Digital Repository Service at National Institute of Oceanography (India)

    Swain, G.; Anil, A.C.; Baier, R; Chia, F.-S.; Conte, E.; Cook, A.; Hadfield, M.; Haslbeck, E.; Holm, E.; Kavanagh, C.; Kohrs, D.; Kovach, B.; Lee, C.; Mazzella, L.; Meyer, A.E.; Qian, P.-Y.; Sawant, S.S.; Schultz, M.; Sigurdsson, J.; Smith, C.; Soo, L.; Terlizzi, A.; Wagh, A.; Zimmerman, R; Zupo, V.

    Little is known about the performance of fouling release coatings at different geographical locations. An investigation was designed to measure the differences in biofouling and biofouling adhesion strength on three known silicone formulations...

  8. Cleanup Verification Package for the 100-F-20, Pacific Northwest Laboratory Parallel Pits

    International Nuclear Information System (INIS)

    Appel, M.J.

    2007-01-01

    This cleanup verification package documents completion of remedial action for the 100-F-20, Pacific Northwest Laboratory Parallel Pits waste site. This waste site consisted of two earthen trenches thought to have received both radioactive and nonradioactive material related to the 100-F Experimental Animal Farm

  9. Pitting corrosion on a copper canister

    International Nuclear Information System (INIS)

    Hermansson, H.P.; Beverskog, B.

    1996-02-01

    It is demonstrated that normal pitting can occur during oxidizing conditions in the repository. It is also concluded that a new theory for pitting corrosion has to be developed, as the present theory is not in accordance with all practical and experimental observations. A special variant of pitting, based on the growth of sulfide whiskers, is suggested to occur during reducing conditions. However, such a mechanism needs to be demonstrated experimentally. A simple calculational model of canister corrosion was developed based on the results of this study. 69 refs, 3 figs

  10. Corrective Action Investigation Plan for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-07-16

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 322 consists of three Corrective Action Sites (CASs): 01-25-01, AST Release (Area 1); 03-25-03, Mud Plant AST Diesel Release (Area 3); 03-20-05, Injection Wells (Area 3). Corrective Action Unit 322 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. The investigation of three CASs in CAU 322 will determine if hazardous and/or radioactive constituents are present at concentrations and locations that could potentially pose a threat to human health and the environment. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  11. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  12. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  13. CHerenkov detectors In mine PitS (CHIPS) Letter of Intent to FNAL

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, P. [Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States); Austin, J. [Univ. of Minnesota, Duluth, MN (United States); Cao, S. V. [Univ. of Texas, Austin, TX (United States); Coelho, J. A. B. [Tufts Univ., Medford, MA (United States); Davies, G. S. [Iowa State Univ., Ames, IA (United States); Evans, J. J. [Univ. of Manchester (United Kingdom); Guzowski, P. [Univ. of Manchester (United Kingdom); Habig, A. [Univ. of Minnesota, Duluth, MN (United States); Holin, A. [Univ. College London, London (United Kingdom); Huang, J. [Univ. of Texas, Austin, TX (United States); Johnson, R. [Univ. of Cincinnati, OH (United States); St. John, J. [Univ. of Cincinnati, OH (United States); Kreymer, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Kordosky, M. [College of William and Mary, Williamsburg, VA (United States); Lang, K. [Univ. of Texas, Austin, TX (United States); Marshak, M. L. [Univ. of Minnesota, Minneapolis, MN (United States); Mehdiyev, R. [Univ. of Texas, Austin, TX (United States); Meier, J. [Univ. of Minnesota, Minneapolis, MN (United States); Miller, W. [Univ. of Minnesota, Minneapolis, MN (United States); Naples, D. [Univ. of Pittsburgh, PA (United States); Nelson, J. K. [College of William and Mary, Williamsburg, VA (United States); Nichol, R. J. [Univ. College London, London (United Kingdom); Patterson, R. B. [California Inst. of Technology (CalTech), Pasadena, CA (United States); Paolone, V. [Univ. of Pittsburgh, PA (United States); Pawloski, G. [Univ. of Minnesota, Minneapolis, MN (United States); Perch, A. [Univ. College London, London (United Kingdom); Pfutzner, M. [Univ. College London, London (United Kingdom); Proga, M. [Univ. of Texas, Austin, TX (United States); Qian, X. [Brookhaven National Lab. (BNL), Upton, NY (United States); Radovic, A. [Univ. College London, London (United Kingdom); Sanchez, M. C. [Iowa State Univ., Ames, IA (United States); Schreiner, S. [Univ. of Minnesota, Minneapolis, MN (United States); Soldner-Rembold, S. [Univ. of Manchester (United Kingdom); Sousa, A. [Univ. of Cincinnati, OH (United States); Thomas, J. [Univ. College London, London (United Kingdom); Vahle, P. [College of William and Mary, Williamsburg, VA (United States); Wendt, C. [Univ. of Wisconsin, Madison, WI (United States); Whitehead, L. H. [Univ. College London, London (United Kingdom); Wojcicki, S. [Stanford Univ., CA (United States)

    2013-12-30

    This Letter of Intent outlines a proposal to build a large, yet cost-effective, 100 kton fiducial mass water Cherenkov detector that will initially run in the NuMI beam line. The CHIPS detector (CHerenkov detector In Mine PitS) will be deployed in a flooded mine pit, removing the necessity and expense of a substantial external structure capable of supporting a large detector mass. There are a number of mine pits in northern Minnesota along the NuMI beam that could be used to deploy such a detector. In particular, the Wentworth Pit 2W is at the ideal off-axis angle to contribute to the measurement of the CP violating phase. The detector is designed so that it can be moved to a mine pit in the LBNE beam line once that becomes operational.

  14. Environmental aspects of a tritium oxide release from the Savannah River Site on September 2 and 3, 1984

    International Nuclear Information System (INIS)

    Hoel, D.D.; Kurzeja, R.J.; Evans, A.G.

    1990-01-01

    Tritium was released to the atmosphere from the Savannah River Plant during an incident on September 2 and 3, 1984 between 10 PM and 3 AM. During this five hour period, 43,800 Ci of tritium, principally in the form of the oxide (HTO), was released. An additional 14,000, Ci was released during subsequent cleanup operations between September 3 and 7. The total amount released from the incident was 57,800 Ci. The HTO cloud initially moved northward and passed near the towns of New Ellenton and Aiken, SC. Two hours after the release began, the wind shifted and carried the cloud toward Columbia, SC. The cloud moved northeast during the daytime on September 3 over the east-central portion of North Carolina. Environmental sampling teams were dispatched by SRL, SRP, and SCDHEC (South Carolina Department of Health and Environmental Control). SRL collected air and vegetation samples and SRP collected vegetation, water, milk and bioassay samples. SCDHEC collected vegetation, milk, and water samples. The highest activity of HTO measured in vegetation was 501 pCi/mL onsite, 2522 pCi/mL at the plant boundary, and 9859 pCi/mL offsite. These concentrations were approximately 100 times larger than normal values. 13 refs., 7 figs., 10 tabs

  15. AHAR: Part 1 - PIT Estimates of Homelessness

    Data.gov (United States)

    Department of Housing and Urban Development — This report outlines the key findings of the 2014 Point-In-Time (PIT) and Housing Inventory (HIC) counts conducted in January 2014. Specifically, this report...

  16. Project Development Specification for Valve Pit Manifold

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the valve pit manifolds. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  17. Superfund and Toxic Release Inventory Sites - INSTITUTIONAL_CONTROLS_IDEM_IN.SHP: Institutional Control Sites in Indiana (Indiana Department of Environmental Management, Polygon Shapefile)

    Data.gov (United States)

    NSGIC State | GIS Inventory — INSTITUTIONAL_CONTROLS_IDEM_IN is a polygon shapefile that contains Institutional Control (IC) site locations in Indiana, provided by personnel of Indiana Department...

  18. Pitting corrosion of copper. Further model studies

    International Nuclear Information System (INIS)

    Taxen, C.

    2002-08-01

    The work presented in this report is a continuation and expansion of a previous study. The aim of the work is to provide background information about pitting corrosion of copper for a safety analysis of copper canisters for final deposition of radioactive waste. A mathematical model for the propagation of corrosion pits is used to estimate the conditions required for stationary propagation of a localised anodic corrosion process. The model uses equilibrium data for copper and its corrosion products and parameters for the aqueous mass transport of dissolved species. In the present work we have, in the model, used a more extensive set of aqueous and solid compounds and equilibrium data from a different source. The potential dependence of pitting in waters with different compositions is studied in greater detail. More waters have been studied and single parameter variations in the composition of the water have been studied over wider ranges of concentration. The conclusions drawn in the previous study are not contradicted by the present results. However, the combined effect of potential and water composition on the possibility of pitting corrosion is more complex than was realised. In the previous study we found what seemed to be a continuous aggravation of a pitting situation by increasing potentials. The present results indicate that pitting corrosion can take place only over a certain potential range and that there is an upper potential limit for pitting as well as a lower. A sensitivity analysis indicates that the model gives meaningful predictions of the minimum pitting potential also when relatively large errors in the input parameters are allowed for

  19. Pit 9 project: A private sector initiative

    International Nuclear Information System (INIS)

    Macdonald, D.W.; Hughes, F.P.; Burton, B.N.

    1993-01-01

    This report discusses the Pit 9 Comprehensive Demonstration which is intended to demonstrate a cost-effective approach to remediate an Idaho National Engineering Laboratory (INEL) waste disposal pit through a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Action. The remediation will include additional requirements, if needed, to provide high confidence that only minor additional work would be necessary to accomplish the final closure as part of the overall final closure strategy for the INEL's Subsurface Disposal Area (SDA)

  20. Pitting corrosion as a mixed system: coupled deterministic-probabilistic simulation of pit growth

    Science.gov (United States)

    Ibrahim, Israr B. M.; Fonna, S.; Pidaparti, R.

    2018-05-01

    Stochastic behavior of pitting corrosion poses a unique challenge in its computational analysis. However, it also stems from electrochemical activity causing general corrosion. In this paper, a framework for corrosion pit growth simulation based on the coupling of the Cellular Automaton (CA) and Boundary Element Methods (BEM) is presented. The framework assumes that pitting corrosion is controlled by electrochemical activity inside the pit cavity. The BEM provides the prediction of electrochemical activity given the geometrical data and polarization curves, while the CA is used to simulate the evolution of pit shapes based on electrochemical activity provided by BEM. To demonstrate the methodology, a sample case of local corrosion cells formed in pitting corrosion with varied dimensions and polarization functions is considered. Results show certain shapes tend to grow in certain types of environments. Some pit shapes appear to pose a higher risk by being potentially significant stress raisers or potentially increasing the rate of corrosion under the surface. Furthermore, these pits are comparable to commonly observed pit shapes in general corrosion environments.

  1. Oxygen pitting failure of a bagasse boiler tube

    CSIR Research Space (South Africa)

    Heyes, AM

    2001-04-01

    Full Text Available Examination of a failed roof tube from a bagasse boiler showed transverse through-cracks and extensive pitting. The pitting was typically oxygen induced pitting and numerous fatigue cracks had started within these pits. It is highly probable...

  2. Bioerosion by pit-forming, temperate-reef sea urchins: History, rates and broader implications.

    Directory of Open Access Journals (Sweden)

    Michael P Russell

    Full Text Available Sea urchins are dominant members of rocky temperate reefs around the world. They often occur in cavities within the rock, and fit so tightly, it is natural to assume they sculpted these "pits." However, there are no experimental data demonstrating they bore pits. If they do, what are the rates and consequences of bioerosion to nearshore systems? We sampled purple sea urchins, Strongylocentrotus purpuratus, from sites with four rock types, three sedimentary (two sandstones and one mudstone and one metamorphic (granite. A year-long experiment showed urchins excavated depressions on sedimentary rocks in just months. The rate of pit formation varied with rock type and ranged from 100 yr for granite. In the field, there were differences in pit size and shapes of the urchins (height:diameter ratio. The pits were shallow and urchins flatter at the granite site, and the pits were deeper and urchins taller at the sedimentary sites. Although overall pit sizes were larger on mudstone than on sandstone, urchin size accounted for this difference. A second, short-term experiment, showed the primary mechanism for bioerosion was ingestion of the substratum. This experiment eliminated potential confounding factors of the year-long experiment and yielded higher bioerosion rates. Given the high densities of urchins, large amounts of rock can be converted to sediment over short time periods. Urchins on sandstone can excavate as much as 11.4 kg m-2 yr-1. On a broader geographic scale, sediment production can exceed 100 t ha-1 yr-1, and across their range, their combined bioerosion is comparable to the sediment load of many rivers. The phase shift between urchin barrens and kelp bed habitats in the North Pacific is controlled by the trophic cascade of sea otters. By limiting urchin populations, these apex predators also may indirectly control a substantial component of coastal rates of bioerosion.

  3. Bioerosion by pit-forming, temperate-reef sea urchins: History, rates and broader implications

    Science.gov (United States)

    Gibbs, Victoria K.; Duwan, Emily

    2018-01-01

    Sea urchins are dominant members of rocky temperate reefs around the world. They often occur in cavities within the rock, and fit so tightly, it is natural to assume they sculpted these “pits.” However, there are no experimental data demonstrating they bore pits. If they do, what are the rates and consequences of bioerosion to nearshore systems? We sampled purple sea urchins, Strongylocentrotus purpuratus, from sites with four rock types, three sedimentary (two sandstones and one mudstone) and one metamorphic (granite). A year-long experiment showed urchins excavated depressions on sedimentary rocks in just months. The rate of pit formation varied with rock type and ranged from 100 yr for granite. In the field, there were differences in pit size and shapes of the urchins (height:diameter ratio). The pits were shallow and urchins flatter at the granite site, and the pits were deeper and urchins taller at the sedimentary sites. Although overall pit sizes were larger on mudstone than on sandstone, urchin size accounted for this difference. A second, short-term experiment, showed the primary mechanism for bioerosion was ingestion of the substratum. This experiment eliminated potential confounding factors of the year-long experiment and yielded higher bioerosion rates. Given the high densities of urchins, large amounts of rock can be converted to sediment over short time periods. Urchins on sandstone can excavate as much as 11.4 kg m-2 yr-1. On a broader geographic scale, sediment production can exceed 100 t ha-1 yr-1, and across their range, their combined bioerosion is comparable to the sediment load of many rivers. The phase shift between urchin barrens and kelp bed habitats in the North Pacific is controlled by the trophic cascade of sea otters. By limiting urchin populations, these apex predators also may indirectly control a substantial component of coastal rates of bioerosion. PMID:29466357

  4. W-12 valve pit decontamination demonstration

    International Nuclear Information System (INIS)

    Benson, C.E.; Parfitt, J.E.; Patton, B.D.

    1995-12-01

    Waste tank W-12 is a tank in the ORNL Low-Level Liquid Waste (LLLW) system that collected waste from Building 3525. Because of a leaking flange in the discharge line from W-12 to the evaporator service tank (W-22) and continual inleakage into the tank from an unknown source, W-12 was removed from service to comply with the Federal Facilities Agreement requirement. The initial response was to decontaminate the valve pit between tank W-12 and the evaporator service tank (W-22) to determine if personnel could enter the pit to attempt repair of the leaking flange. Preventing the spread of radioactive contamination from the pit to the environment and to other waste systems was of concern during the decontamination. The drain in the pit goes to the process waste system; therefore, if high-level liquid waste were generated during decontamination activities, it would have to be removed from the pit by means other than the available liquid waste connection. Remote decontamination of W-12 was conducted using the General Mills manipulator bridge and telescoping trolley and REMOTEC RM-10 manipulator. The initial objective of repairing the leaking flange was not conducted because of the repair uncertainty and the unknown tank inleakage. Rather, new piping was installed to empty the W-12 tank that would bypass the valve pit and eliminate the need to repair the flange. The radiological surveys indicated that a substantial decontamination factor was achieved

  5. Radiological effluents released from nuclear rocket and ramjet engine tests at the Nevada Test Site 1959 through 1969: Fact Book

    Energy Technology Data Exchange (ETDEWEB)

    Friesen, H.N.

    1995-06-01

    Nuclear rocket and ramjet engine tests were conducted on the Nevada Test Site (NTS) in Area 25 and Area 26, about 80 miles northwest of Las Vegas, Nevada, from July 1959 through September 1969. This document presents a brief history of the nuclear rocket engine tests, information on the off-site radiological monitoring, and descriptions of the tests.

  6. The Influences of Artificial Aging Temperature and Time on Pitting Susceptibility of SiCp/ AA2024 MMCs

    International Nuclear Information System (INIS)

    Kim, S. K.; Jo, C. J.; Kwon, B. H.; Hwang, W. S.

    2000-01-01

    The effects of artificial aging temperature and time were investigated on the pitting behaviors of SiCp/ AA2024 composites through measuring the changes of open circuit potential, pitting potential, and repassivation potential in a 3.5 wt% NaCl solution. And, the influence of microstructure on the pitting susceptibility was studied by measurement of TEM images. AA2024 Al alloy and 15vol%SiCp/ AA2024 composites were fabricated by vacuum hot pressing and hot extrusion with an extrusion ratio of 25 : 1. They were solutionized at 495 .deg. C for 4 hours, and aged at 130, 150, 170, and 190 .deg. C for 1, 2, 4, 8, and 16 hours. In aerated 3.5% NaCl solutions, the open circuit potential and pitting potential of both AA2024 alloy and composites were similar each other, and pitting occurred immediately at immersed condition. The pitting potential was decreased with increasing aging temperature and time. Also, the repassivation potential of SiCp/ AA2024 composites was decreased as increasing aging temperature and time. It was concluded that formation and growth of S' and S phase by artificial aging promoted the pitting susceptibility of SiCp/ AA2024 composites because these phases, easily soluble by forming galvanic couples with substrate Al alloy, served as preferential sites for nucleation of pits

  7. Pit disassembly and conversion demonstration environmental assessment and research and development activities

    International Nuclear Information System (INIS)

    1998-08-01

    A significant portion of the surplus plutonium is in the form of pits, a nuclear weapons component. Pits are composed of plutonium which is sealed in a metallic shell. These pits would need to be safely disassembled and permanently converted to an unclassified form that would be suitable for long-term disposition and international inspection. To determine the feasibility of an integrated pit disassembly and conversion system, a Pit Disassembly and Conversion Demonstration is proposed to take place at the Los Alamos National Laboratory (LANL). This demonstration would be done in existing buildings and facilities, and would involve the disassembly of up to 250 pits and conversion of the recovered plutonium to plutonium metal ingots and plutonium dioxide. This demonstration also includes the conversion of up to 80 kilograms of clean plutonium metal to plutonium dioxide because, as part of the disposition process, some surplus plutonium metal may be converted to plutonium dioxide in the same facility as the surplus pits. The equipment to be used for the proposed demonstration addressed in this EA would use some parts of the Advanced Recovery and Integrated Extraction System (ARIES) capability, other existing equipment/capacities, plus new equipment that was developed at other sites. In addition, small-scale R and D activities are currently underway as part of the overall surplus plutonium disposition program. These R and D activities are related to pit disassembly and conversion, MOX fuel fabrication, and immobilization (in glass and ceramic forms). They are described in Section 7.0. On May 16, 1997, the Office of Fissile Materials Disposition (MD) notified potentially affected states and tribes that this EA would be prepared in accordance with NEPA. This EA has been prepared to provide sufficient information for DOE to determine whether a Finding of No Significant Impact (FONSI) is warranted or whether an EIS must be prepared

  8. Fission product iodine during early Hanford-Site operations: Its production and behavior during fuel processing, off-gas treatment and release to the atmosphere

    International Nuclear Information System (INIS)

    Burger, L.L.

    1991-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate the radiological dose impact that Hanford Site operations may have made on the local and regional population. This impact is estimated by examining operations involving radioactive materials that were conducted at the Hanford Site from the startup of the first reactor in 1944 to the present. HEDR Project work is divided among several technical tasks. One of these tasks, Source Terms, is designed to develop quantitative estimates of all significant emissions of radionuclides by Hanford Site operations since 1944. Radiation doses can be estimated from these emissions by accounting for specific radionuclide transport conditions and population demography. This document provides technical information to assist in the evaluation of iodine releases. 115 refs., 5 figs., 3 tabs

  9. Fission product iodine during early Hanford-Site operations: Its production and behavior during fuel processing, off-gas treatment and release to the atmosphere

    Energy Technology Data Exchange (ETDEWEB)

    Burger, L.L.

    1991-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate the radiological dose impact that Hanford Site operations may have made on the local and regional population. This impact is estimated by examining operations involving radioactive materials that were conducted at the Hanford Site from the startup of the first reactor in 1944 to the present. HEDR Project work is divided among several technical tasks. One of these tasks, Source Terms, is designed to develop quantitative estimates of all significant emissions of radionuclides by Hanford Site operations since 1944. Radiation doses can be estimated from these emissions by accounting for specific radionuclide transport conditions and population demography. This document provides technical information to assist in the evaluation of iodine releases. 115 refs., 5 figs., 3 tabs.

  10. Assessment of effectiveness of geologic isolation systems. A conceptual simulation model for release scenario analysis of a hypothetical site in Columbia Plateau Basalts

    International Nuclear Information System (INIS)

    Stottlemyre, J.A.; Petrie, G.M.; Benson, G.L.; Zellmer, J.T.

    1981-01-01

    This report is a status report for an evolving methodology for release scenario development for underground nuclear waste repositories. As such, it is intended for use as a reference point and a preliminary description of an evolving geoscience methodology. When completed this methodology will be used as a tool in developing disruptive release scenarios for analyzing the long-term safety of geological nuclear waste repositories. While a basalt environment is used as an example, this report is not intended to reflect an actual site safety assessment for a repository in a media. It is rather intended to present a methodology system framework and to provide discussions of the geological phenomena and parameters that must be addressed in order to develop a methodology for potential release scenarios. It is also important to note that the phenomena, their interrelationships, and their relative importance along with the overall current structure of the model will change as new geological information is gathered through additional peer review, geotechnical input, site specific field work, and related research efforts

  11. A probability distribution model of tooth pits for evaluating time-varying mesh stiffness of pitting gears

    Science.gov (United States)

    Lei, Yaguo; Liu, Zongyao; Wang, Delong; Yang, Xiao; Liu, Huan; Lin, Jing

    2018-06-01

    Tooth damage often causes a reduction in gear mesh stiffness. Thus time-varying mesh stiffness (TVMS) can be treated as an indication of gear health conditions. This study is devoted to investigating the mesh stiffness variations of a pair of external spur gears with tooth pitting, and proposes a new model for describing tooth pitting based on probability distribution. In the model, considering the appearance and development process of tooth pitting, we model the pitting on the surface of spur gear teeth as a series of pits with a uniform distribution in the direction of tooth width and a normal distribution in the direction of tooth height, respectively. In addition, four pitting degrees, from no pitting to severe pitting, are modeled. Finally, influences of tooth pitting on TVMS are analyzed in details and the proposed model is validated by comparing with a finite element model. The comparison results show that the proposed model is effective for the TVMS evaluations of pitting gears.

  12. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2001-09-24

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a & b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval.

  13. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0); FINAL

    International Nuclear Information System (INIS)

    2001-01-01

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a and b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval

  14. Ten-Year Performance of Eastern White Pine - under a Crop Tree Release Regime on an Outwash Site

    Science.gov (United States)

    Kenneth M. Desmarais; William B. Leak; William B. Leak

    2005-01-01

    A young stand of eastern white pine aged 38-40 years received a crop tree release cutting reducing stocking to 100 tree/ac. This stocking level reflects the number of sterms per acre that would be contained in a well stocked mature stand at final harvest (20-in. quadratic mean stand diameter). The stand then was monitored for growth and value change. Stems that grew...

  15. Siting of Nuclear Power Plants in Metropolitan Areas. Estimation of Population Doses due to Accidental Release of Fission Products

    Energy Technology Data Exchange (ETDEWEB)

    Bresser, H. [Technischer Ueberwachungs-Verein Rheinland E.V., Cologne (Germany); Schwarzer, W. [Institut fuer Reaktorsicherheit der Technischen Ueberwachungs-Vereine E.V., Cologne (Germany)

    1967-09-15

    The safety of large nuclear power plants in heavily populated areas depends entirely on engineered safeguards. An assessment of their reliability and effectiveness will have to play a major role in any safety analysis of such a plant, and this assessment will have to be made on the basis of the radiological burden to the environment - in terms of individual dose and a population dose - which can be accepted as tolerable in case of a severe accident. The calculation of the dispersion of fission products in the atmosphere, which links the radiological burden to the release of radioactivity, should be modified. The fact that distance factors, aside from a comparably small exclusion area, can no longer be taken into account suggests the introduction of the parameter ''population density'' and an extensive use of the man-rem concept. In this connection the time history of the release and the influence of variations of wind directions lose their importance. The authors have carried out calculations of the population dose, which could be received in a metropolitan area as a consequence of a severe reactor accident, using population densities, height of release above ground and generalized meteorological data as the main parameters. The results of these calculations are used as a basis for an assessment of the performance requirements of the engineered safeguards system, and the relative importance of different components of this system is discussed. (author)

  16. Pitting of malaria parasites and spherocyte formation

    Directory of Open Access Journals (Sweden)

    Gichuki Charity W

    2006-07-01

    Full Text Available Abstract Background A high prevalence of spherocytes was detected in blood smears of children enrolled in a case control study conducted in the malaria holoendemic Lake Victoria basin. It was speculated that the spherocytes reflect intraerythrocytic removal of malarial parasites with a concurrent removal of RBC membrane through a process analogous to pitting of intraerythrocytic inclusion bodies. Pitting and re-circulation of RBCs devoid of malaria parasites could be a host mechanism for parasite clearance while minimizing the anaemia that would occur were the entire parasitized RBC removed. The prior demonstration of RBCs containing ring-infected erythrocyte surface antigen (pf 155 or RESA but no intracellular parasites, support the idea of pitting. Methods An in vitro model was developed to examine the phenomenon of pitting and spherocyte formation in Plasmodium falciparum infected RBCs (iRBC co-incubated with human macrophages. In vivo application of this model was evaluated using blood specimens from patients attending Kisumu Ditrict Hospital. RBCs were probed with anti-RESA monoclonal antibody and a DNA stain (propidium iodide. Flow cytometry and fluorescent microscopy was used to compare RBCs containing both the antigen and the parasites to those that were only RESA positive. Results Co-incubation of iRBC and tumor necrosis factor-alpha activated macrophages led to pitting (14% ± 1.31% macrophages with engulfed trophozoites as opposed to erythrophagocytosis (5.33% ± 0.95% (P Conclusion It is proposed that in malaria holoendemic areas where prevalence of asexual stage parasites approaches 100% in children, RBCs with pitted parasites are re-circulated and pitting may produce spherocytes.

  17. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  18. Tank Riser Pit Decontamination System (Pit Viper) Return on Investment and Break-Even Analysis

    International Nuclear Information System (INIS)

    Young, Joan K.; Weimar, Mark R.; Balducci, Patrick J.; Fassbender, Linda L.; Hernandez, Melissa

    2003-01-01

    This study assessed the cost benefit of Pit Viper deployment for 80 tank farm pits between October 1, 2003 and September 30, 2012 under the technical baseline for applicable double-shell tank (DST) and single-shell tank (SST) projects. After this assessment had been completed, the U.S. Department of Energy (DOE) Richland Operations Office (RL) and Office of River Protection (ORP) published the Hanford Performance Management Plan (August 2003), which accelerated the schedule for SST retrieval. Then, DOE/CH2M HILL contract modification M064 (October 2002) and The Integrated Mission Acceleration Plan (March 2003) further accelerated SST retrieval and closure schedules. Twenty-six to 40 tanks must be retrieved by 2006. Thus the schedule for SST pit entries is accelerated and the number of SST pit entries is increased. This study estimates the return on investment (ROI) and the number of pits where Pit Viper deployment would break even or save money over current manual practices. The results of the analysis indicate a positive return on the federal investment for deployment of the Pit Viper provided it is used on a sufficient number of pits

  19. Estimated airborne release of plutonium from Westinghouse Cheswick site as a result of postulated damage from severe wind and seismic hazard

    International Nuclear Information System (INIS)

    Mishima, J.; Schwendiman, L.C.; Ayer, J.E.

    1979-06-01

    The potential airborne releases of plutonium (source terms) from postulated damage sustained by the Westinghouse Plutonium Fuel Development Laboratories at the Cheswick site in Pennsylvania as a result of various levels of wind and seismic hazard are estimated. The source terms are based on damage scenarios originated by other specialists and range up to 260 mph for wind hazard and in excess of 0.39 g ground acceleration for seismic hazard. The approaches and factors used to estimate the source terms (inventories of dispersible materials at risk, damage levels and ratios, fractional airborne releases of dispersible materials under stress, atmosphere exchange rates, and source term ranges) are discussed. Source term estimates range from less than 10 -7 g plutonium to greater than 130 g plutonium over a four-day period

  20. Corrective Action Investigation plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Alfred Wickline

    2008-01-01

    Corrective Action Unit (CAU) 546 is located in Areas 6 and 9 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 546 is comprised of two Corrective Action Sites (CASs) listed below: 06-23-02, U-6a/Russet Testing Area 09-20-01, Injection Well These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 8, 2007, by representatives of the Nevada Division of Environmental Protection and U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process has been used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 546

  1. Compared sensitivity of two nuclear sites: case of farming production contaminated by foliar way (chronicle release) S.E.N.S.I.B. project

    International Nuclear Information System (INIS)

    Mercat, C.; Vassas, C.

    2005-01-01

    This study joins within the framework of the S.E.N.S.I.B. project. The principle is to set up a step which allows to compare the sensitivity of two sites in case of radioisotopes releases; as illustration the sites of Marcoule and La Hague are considered. We are interested here in the case of the agricultural productions contaminated by foliar way during an atmospheric chronic release. Every site is characterized by specific vegetable and animal productions. The calculations of activities give an information about the sensitivity of products (mass and surface activities) and on the sensitivity of the Communes ( total activities). The contamination is supposed to be only made about foliar transfer. The studied radioisotopes are the cesium 137 , the cobalt 60 , the strontium 90 and the iodine 131 . For the cesium 137 and the cobalt 60 , the agricultural environment of the site of Marcoule seems globally more sensitive than that of La Hague, in the mean where the total activity in becquerels exported by the agricultural productions produced on the zone of 10 km around the site is more important for Marcoule than for La Hague. For the strontium 90 and for the iodine 131 , both agricultural environments are globally equivalent. This study which privileged the consideration of the regional specificities shows that the key factors of sensitivity are respectively the topographic situation for the deposit, the factor of translocation and the farming output for the vegetable productions and the daily food ration and the factor of transfer for the animal productions. (N.C.)

  2. NELL-1 increases pre-osteoblast mineralization using both phosphate transporter Pit1 and Pit2

    Energy Technology Data Exchange (ETDEWEB)

    Cowan, Catherine M. [Department of Bioengineering, University of California, Los Angeles, 420 Westwood Plaza,7523 Boelter Hall, Los Angeles, CA 90095 (United States); Dental and Craniofacial Research Institute and Section of Orthodontics, School of Dentistry, University of California, Los Angeles, 40833 Le Conte Ave, Los Angeles, CA 90095 (United States); Zhang, Xinli; James, Aaron W.; Mari Kim, T.; Sun, Nichole [Dental and Craniofacial Research Institute and Section of Orthodontics, School of Dentistry, University of California, Los Angeles, 40833 Le Conte Ave, Los Angeles, CA 90095 (United States); Wu, Benjamin [Department of Bioengineering, University of California, Los Angeles, 420 Westwood Plaza,7523 Boelter Hall, Los Angeles, CA 90095 (United States); Dental and Craniofacial Research Institute and Section of Orthodontics, School of Dentistry, University of California, Los Angeles, 40833 Le Conte Ave, Los Angeles, CA 90095 (United States); Ting, Kang [Dental and Craniofacial Research Institute and Section of Orthodontics, School of Dentistry, University of California, Los Angeles, 40833 Le Conte Ave, Los Angeles, CA 90095 (United States); Soo, Chia, E-mail: bsoo@ucla.edu [UCLA and Orthopaedic Hospital Department of Orthopaedic Surgery and the Orthopaedic, Hospital Research Center, University of California, Los Angeles, 2641 Charles E. Young Dr. South, Los Angeles, CA 90095 (United States)

    2012-06-08

    Highlights: Black-Right-Pointing-Pointer NELL-1 accelerates extracellular matrix mineralization in MC3T3-E1 pre-osteoblasts. Black-Right-Pointing-Pointer NELL-1 significantly increases intracellular inorganic phosphate levels. Black-Right-Pointing-Pointer NELL-1 positively regulates osteogenesis but not proliferation in MC3T3-E1 cells. Black-Right-Pointing-Pointer NELL-1 regulates inorganic phosphate transporter activity. -- Abstract: NELL-1 is a potent osteoinductive molecule that enhances bone formation in multiple animal models through currently unidentified pathways. In the present manuscript, we hypothesized that NELL-1 may regulate osteogenic differentiation accompanied by alteration of inorganic phosphate (Pi) entry into the osteoblast via sodium dependent phosphate (NaPi) transporters. To determine this, MC3T3-E1 pre-osteoblasts were cultured in the presence of recombinant human (rh)NELL-1 or rhBMP-2. Analysis was performed for intracellular Pi levels through malachite green staining, Pit-1 and Pit-2 expression, and forced upregulation of Pit-1 and Pit-2. Results showed rhNELL-1 to increase MC3T3-E1 matrix mineralization and Pi influx associated with activation of both Pit-1 and Pit-2 channels, with significantly increased Pit-2 production. In contrast, Pi transport elicited by rhBMP-2 showed to be associated with increased Pit-1 production only. Next, neutralizing antibodies against Pit-1 and Pit-2 completely abrogated the Pi influx effect of rhNELL-1, suggesting rhNELL-1 is dependent on both transporters. These results identify one potential mechanism of action for rhNELL-1 induced osteogenesis and highlight a fundamental difference between NELL-1 and BMP-2 signaling.

  3. NELL-1 increases pre-osteoblast mineralization using both phosphate transporter Pit1 and Pit2

    International Nuclear Information System (INIS)

    Cowan, Catherine M.; Zhang, Xinli; James, Aaron W.; Mari Kim, T.; Sun, Nichole; Wu, Benjamin; Ting, Kang; Soo, Chia

    2012-01-01

    Highlights: ► NELL-1 accelerates extracellular matrix mineralization in MC3T3-E1 pre-osteoblasts. ► NELL-1 significantly increases intracellular inorganic phosphate levels. ► NELL-1 positively regulates osteogenesis but not proliferation in MC3T3-E1 cells. ► NELL-1 regulates inorganic phosphate transporter activity. -- Abstract: NELL-1 is a potent osteoinductive molecule that enhances bone formation in multiple animal models through currently unidentified pathways. In the present manuscript, we hypothesized that NELL-1 may regulate osteogenic differentiation accompanied by alteration of inorganic phosphate (Pi) entry into the osteoblast via sodium dependent phosphate (NaPi) transporters. To determine this, MC3T3-E1 pre-osteoblasts were cultured in the presence of recombinant human (rh)NELL-1 or rhBMP-2. Analysis was performed for intracellular Pi levels through malachite green staining, Pit-1 and Pit-2 expression, and forced upregulation of Pit-1 and Pit-2. Results showed rhNELL-1 to increase MC3T3-E1 matrix mineralization and Pi influx associated with activation of both Pit-1 and Pit-2 channels, with significantly increased Pit-2 production. In contrast, Pi transport elicited by rhBMP-2 showed to be associated with increased Pit-1 production only. Next, neutralizing antibodies against Pit-1 and Pit-2 completely abrogated the Pi influx effect of rhNELL-1, suggesting rhNELL-1 is dependent on both transporters. These results identify one potential mechanism of action for rhNELL-1 induced osteogenesis and highlight a fundamental difference between NELL-1 and BMP-2 signaling.

  4. Grave pit modifications and wooden structures in the Great Moravian graves and their information potential for cognition of the social structure of the Great Moravian society

    Czech Academy of Sciences Publication Activity Database

    Mazuch, Marian; Hladík, Marek

    2013-01-01

    Roč. 54, č. 2 (2013), s. 45-55 ISSN 1211-7250 R&D Projects: GA ČR GP13-20936P Keywords : Early Middle Ages * Great Moravia * Mikulčice * burial sites * graves * grave pits * burial pits * wooden structures * funeral rite * social structure * GIS * statistics Subject RIV: AC - Archeology, Anthropology, Ethnology

  5. Dose commitments due to radioactive releases from nuclear power plant sites: Methodology and data base. Supplement 1

    Energy Technology Data Exchange (ETDEWEB)

    Baker, D.A. [Pacific Northwest National Lab., Richland, WA (United States)

    1996-06-01

    This manual describes a dose assessment system used to estimate the population or collective dose commitments received via both airborne and waterborne pathways by persons living within a 2- to 80-kilometer region of a commercial operating power reactor for a specific year of effluent releases. Computer programs, data files, and utility routines are included which can be used in conjunction with an IBM or compatible personal computer to produce the required dose commitments and their statistical distributions. In addition, maximum individual airborne and waterborne dose commitments are estimated and compared to 10 CFR Part 50, Appendix 1, design objectives. This supplement is the last report in the NUREG/CR-2850 series.

  6. Dose commitments due to radioactive releases from nuclear power plant sites: Methodology and data base. Supplement 1

    International Nuclear Information System (INIS)

    Baker, D.A.

    1996-06-01

    This manual describes a dose assessment system used to estimate the population or collective dose commitments received via both airborne and waterborne pathways by persons living within a 2- to 80-kilometer region of a commercial operating power reactor for a specific year of effluent releases. Computer programs, data files, and utility routines are included which can be used in conjunction with an IBM or compatible personal computer to produce the required dose commitments and their statistical distributions. In addition, maximum individual airborne and waterborne dose commitments are estimated and compared to 10 CFR Part 50, Appendix 1, design objectives. This supplement is the last report in the NUREG/CR-2850 series

  7. Swimming depth of migrating silver eels Anguilla japonica released at seamounts of the West Mariana Ridge, their estimated spawning sites

    OpenAIRE

    Aoyama, J.; Hissmann, Karen; Yoshinaga, T.; Sasai, S.; Uto, T.; Ueda, H.

    1999-01-01

    Five hormone-treated female Japanese silver eels Anguilla japonica were tagged with ultrasonic transmitters and released by submersible in the West Pacific at seamounts of the West Mariana Ridge, their supposed spawning grounds. Four eels were tracked for 60 to 423 min in the vicinity of the seamounts. They did not settle at the seamounts but swam at a mean speed of 0.37 m s-1 into open water above deep ground. Their mean swimming depth ranged from 81 to 172 m. Experiments suggest that pre-ma...

  8. Volume Measurements of Laser-generated Pits for In Situ Geochronology using KArLE (Potassium-Argon Laser Experiment)

    Science.gov (United States)

    French, R. A.; Cohen, B. A.; Miller, J. S.

    2014-01-01

    The Potassium-Argon Laser Experiment( KArLE), is composed of two main instruments: a spectrometer as part of the Laser-Induced Breakdown Spectroscopy (LIBS) method and a Mass Spectrometer (MS). The LIBS laser ablates a sample and creates a plasma cloud, generating a pit in the sample. The LIBS plasma is measured for K abundance in weight percent and the released gas is measured using the MS, which calculates Ar abundance in mols. To relate the K and Ar measurements, total mass of the ablated sample is needed but can be difficult to directly measure. Instead, density and volume are used to calculate mass, where density is calculated based on the elemental composition of the rock (from the emission spectrum) and volume is determined by pit morphology. This study aims to reduce the uncertainty for KArLE by analyzing pit volume relationships in several analog materials and comparing methods of pit volume measurements and their associated uncertainties.

  9. Assessment of erecting nuclear power plants below ground in an open building pit

    International Nuclear Information System (INIS)

    Kroeger, W.; Altes, J.; Bongartz, R.; David, P.H.; Escherich, K.H.; Kasper, K.; Koschmieder, D.; Roethig, K.D.; Schwarzer, K.; Wolters, J.

    1978-01-01

    The technical feasibility, costs and safety potential of siting a nuclear power plant below ground level have been assessed. The reference plant was a 1,300 MWsub(e) PWR and the siting was based on a 'cut-and-cover' design in soil. The 'cut-and-cover' design enhances the safety potential of the site both with regard to extreme internal accidents and to external impacts inclusive of hostile attack. The measures required to 'harden' the site against these extreme conditions do not cancel each other. The realization of the safety potential is strongly dependent on the reliability of the closure equipment on routes to the atmosphere. These closures represent the remaining vulnerable feature of the design, as all other release paths are through soil which prevents any immediate danger to the public. The concepts considered include partial or complete lowering of the reactor. The thickness of the coverage depends on the degree of protection required and is typically between 8 and 13 m. The essential systems of the above-ground design are unchanged and therefore prior experience and existing designs can be applied. The concepts appear to be technically feasible including, in particular, the large pits and the additional closures; the technical difficulties, however, should not be underestimated. The depth of lowering does not determine the gain in safety because a well designed coverage can act as natural soil. Partial lowering, in fact, appears to be the more economic method. According to the degree of protection and the variations of design, the concepts would cost between 8 and 14% more than the capital cost of an equivalent above-ground plant. The construction time would be extended by 1.4 years for the concepts investigated. (orig./HP) [de

  10. Electrochemical study of the AISI 409 ferritic stainless steel: passive film stability and pitting nucleation and growth

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Juliana Sarango de [Universidade Federal de São Paulo (UNIFESP), Diadema, SP (Brazil). Departamento de Ciências Exatas e da Terra; Oliveira, Leandro Antônio de; Antunes, Renato Altobelli, E-mail: renato.antunes@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo André, SP (Brazil). Centro de Engenharia, Modelagem e Ciências Sociais Aplicadas; Sayeg, Isaac Jamil [Universidade de São Paulo (USP), SP (Brazil). Instituto de Geociências

    2017-11-15

    The aim of the present work was to study the passive film stability and pitting corrosion behavior of the AISI 409 stainless steel. The electrochemical tests were carried out in 0.1 M NaCl solution at room temperature. The general electrochemical behavior was assessed using electrochemical impedance spectroscopy (EIS) measurements whereas the semiconducting properties of the passive film were evaluated by the Mott-Schottky approach. Pitting corrosion was investigated using potentiodynamic and potentiostatic polarization tests. Surface morphology was examined using confocal laser scanning microscopy and scanning electron microscopy (SEM). Energy dispersive X-ray spectroscopy (EDS) analyses were carried out to identify the composition of precipitates that could act as preferential sites for the onset of pitting corrosion. The results showed that the passive film presents n-type semiconductive behavior. Grain boundaries played an important role as pitting initiation sites for the AISI 409 stainless steel. (author)

  11. Electrochemical study of the AISI 409 ferritic stainless steel: passive film stability and pitting nucleation and growth

    International Nuclear Information System (INIS)

    Souza, Juliana Sarango de; Oliveira, Leandro Antônio de; Antunes, Renato Altobelli; Sayeg, Isaac Jamil

    2017-01-01

    The aim of the present work was to study the passive film stability and pitting corrosion behavior of the AISI 409 stainless steel. The electrochemical tests were carried out in 0.1 M NaCl solution at room temperature. The general electrochemical behavior was assessed using electrochemical impedance spectroscopy (EIS) measurements whereas the semiconducting properties of the passive film were evaluated by the Mott-Schottky approach. Pitting corrosion was investigated using potentiodynamic and potentiostatic polarization tests. Surface morphology was examined using confocal laser scanning microscopy and scanning electron microscopy (SEM). Energy dispersive X-ray spectroscopy (EDS) analyses were carried out to identify the composition of precipitates that could act as preferential sites for the onset of pitting corrosion. The results showed that the passive film presents n-type semiconductive behavior. Grain boundaries played an important role as pitting initiation sites for the AISI 409 stainless steel. (author)

  12. Updated synthesis of knowledge related to the impact of radioactive releases from the damaged nuclear site of Fukushima Dai-Ichi on the marine environment - 13 July 2012

    International Nuclear Information System (INIS)

    2012-01-01

    Illustrated by tables, figures and graphs, this report first comments the evolution of the radioactive pollution of sea water: main radionuclides notices in sea water since the 21 March 2011 (with two main origins: atmospheric fallouts, liquid releases from the site), evolution of sea water contamination along the coast at the vicinity of the power station, simulation of caesium 137 dispersion in sea water off Japan. Then, it comments the evolution of the presence of radionuclides in sediments and in marine species (species with contamination level exceeding the admissible level for consumption, concentrations noticed by sea animals, expected evolution for marine species, other published data)

  13. Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gwin, Jeremy; Frenette, Douglas

    2010-01-01

    This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy (DOE) Order DOE O 5400.5, 'Radiation Protection of the Public and the Environment'). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the

  14. Spontaneous Resolution of Optic Disc Pit Maculopathy

    Directory of Open Access Journals (Sweden)

    Koushik Tripathy

    2017-06-01

    Full Text Available I read with interest the article reporting spontaneous resolution of optic disc pit maculopathy in a boy.1 Though the presence of an optic disc pit and associated macular involvement is undoubted in the presented case, the provided optical coherence tomography (OCT does not clearly show typical intraretinal schisis (Figure 1B1 at multiple retinal levels which may communicate with the pit. Instead, it shows a sub-internal limiting membrane (sub-ILM cavity. Such cavities are known to occur following the resolution of sub-ILM bleed due to various cause including Valsalva retinopathy,2 Terson syndrome, and also in some retinitis3 cases.4 In fact, some of these cavities may simulate a neurosensory retinal detachment or central serous chorioretinopathy on cursory clinical examination.5 To confirm that the features of the current patient1 are indeed related to the optic disc pit, it is necessary for the authors to provide an OCT scan which shows a connection of the presented cavity with the optic disc pit. Also, clear OCT scans of the fovea, both at presentation and at final follow-up would help our understanding of the visual recovery of the patient. The interval between the presenting (28 June 2012 OCT and final OCT (30 Nov 2012 is 5 months and not 6 months as described in the manuscript. For an effective comparison, both the presenting and final OCT scans should have been taken using either horizontal or vertical orientation over the macula. Though the spontaneous resolution of optic disc pit maculopathy is possible, visual recovery in usually unlikely and in such cases an alternate diagnosis needs to be excluded.

  15. Pitting corrosion of zirconium in aqueous solution

    International Nuclear Information System (INIS)

    El Shayeb, H.A.; Abd El Wahab, F.M.; Abd Elk Meguid, E.A.

    1994-01-01

    The open circuit potentials of the Zr electrode are followed as a function of time in various aqueous solutions till attainment of steady state values.The results are discussed on the basis of oxide film thickening and repair. Pitting corrosion of Zr was examined in chloride solutions using the potentiodynamic technique. The effect of some inorganic and organic additives was also investigated for inhibiting the pitting corrosion of Zr and the relative performance is presented and discussed. (author). 21 refs., 6 figs., 1 tab

  16. 5G in Open-Pit Mines

    DEFF Research Database (Denmark)

    Portela Lopes de Almeida, Erika; Caldwell, George; Rodriguez Larrad, Ignacio

    2017-01-01

    5G will play a pivotal role in the digitization of the industrial sector and is expected to make the best use of every bit of spectrum available. In this light, this paper presents the results of an extensive measurement campaign in two iron-ore open-pit mining complexes, at the 700 MHz and 2.6 GHz...... for the future wireless network design, simulation and performance evaluation. The results show that, in order to comply with ultra-reliable communications (URC) availability requirements, larger shadowing margins will have to be considered in the network planning in open-pit mines, when compared to traditional...

  17. Accidental release of iodine 131 by the IRE of the Fleurus site: return on experience by the Belgian safety authority

    International Nuclear Information System (INIS)

    Vandecasteele, C.M.; Sonck, M.; Degueldre, D.

    2010-01-01

    After a presentation of the activities of the IRE, the Belgian National Institute of Radio-elements, i.e. the production of radionuclides used in nuclear medicine, this report describes the process and chemical reaction which caused an accidental release of iodine 131. It analyzes the causes of this incident, and how the incident has been managed by the Belgian safety authority. It discusses the first assessment of radiological consequences, describes how the incident has been managed at the federal level, and how population and media have been informed. It discusses the actual radiological consequences through measurements performed on grass and vegetables (graphs and maps indicate contamination levels and contaminated areas), and through the assessment of exposure of adults and children by different ways. Lessons learned are then discussed

  18. On-site releases of noble gases and iodine in the event of core meltdown in a swimming pool reactor

    International Nuclear Information System (INIS)

    Montaignac, E. de.

    1976-10-01

    Research aimed at defining a standard model accident for swimming pool type reactors, has led to the adoption to the so-called BORAX accident which involves complete meltdown of the reactor core. This type of accident-an accident related to dimensional problems- is useful for calculations concerning reactor components which have to withstand the mechanical forces resulting from the accident. A study of the radiobiological consequences of this type of accident, involving the entire reactor core, required research to determine as accurately as possible how the iodine, noble gases and solid fission products are distributed between the melted core and the site. The joint document in the annexure served as the basis for discussion at the meeting (BEVS/SESR) on 9th March 1973, at which the SESR set the standard parameter values to be used for estimating fission product distributions on the site. (author)

  19. A Comprehensive and Systematic Approach to Developing and Documenting Conceptual Models of Contaminant Release and Migration at the Hanford Site

    International Nuclear Information System (INIS)

    Last, George V.; Rohay, Virginia J.; Schelling, F J.; Bunn, Amoret L.; Delamare, Michael A.; Dirkes, Roger L.; Hildebrand, R D.; Morse, John G.; Napier, Bruce A.; Riley, Robert G.; Soler, Luis; Thorne, Paul D.

    2004-01-01

    The U. S. Department of Energy?s Richland Operations Office has initiated efforts to adapt and implement the Features, Events, and Processes (FEPs) methodology (used in scenario development for nuclear waste disposal programs) to the environmental management and remediation problems facing the Hanford Site. These efforts have shown that modification of the FEPs methodology to incorporate the use of Process Relationship Diagrams (PRD) is effective in facilitating the development of conceptual models and selection of potentially relevant factors to be incorporated into a specific performance assessment. In developing this methodology for Hanford, a master PRD was created to provide an organization structure for identifying the potentially relevant factors (i.e. FEPs) and for illustrating the relationships between these factors. This organizational framework was developed to match the organization of current Hanford site-wide performance assessment activities and to facilitate screening of the FEPs relevant to the problems (and conceptual models) that need to be addressed at the site. However, the link between Hanford specific FEPs and the international list of FEPs was maintained to demonstrate completeness and perhaps to expand the usefulness of the international list for other environmental programs

  20. Modeling and management of pit lake water chemistry 1: Theory

    International Nuclear Information System (INIS)

    Castendyk, D.N.; Eary, L.E.; Balistrieri, L.S.

    2015-01-01

    Highlights: • Review of pit lake literature in the context of pit lake predictions. • Review of approaches used to predict pit wall-rock runoff and leachate. • Review of approaches used to generate a pit lake water balance. • Review of approaches used to generate a hydrodynamic prediction. • Review of approaches used to generate a geochemical prediction of a future pit lake. - Abstract: Pit lakes are permanent hydrologic/landscape features that can result from open pit mining for metals, coal, uranium, diamonds, oil sands, and aggregates. Risks associated with pit lakes include local and regional impacts to water quality and related impacts to aquatic and terrestrial ecosystems. Stakeholders rely on predictive models of water chemistry to prepare for and manage these risks. This paper is the first of a two part series on the modeling and management of pit lakes. Herein, we review approaches that have been used to quantify wall-rock runoff geochemistry, wall-rock leachate geochemistry, pit lake water balance, pit lake limnology (i.e. extent of vertical mixing), and pit lake water quality, and conclude with guidance on the application of models within the mine life cycle. The purpose of this paper is to better prepare stakeholders, including future modelers, mine managers, consultants, permitting agencies, land management agencies, regulators, research scientists, academics, and other interested parties, for the challenges of predicting and managing future pit lakes in un-mined areas

  1. Markov Chain Models for the Stochastic Modeling of Pitting Corrosion

    Directory of Open Access Journals (Sweden)

    A. Valor

    2013-01-01

    Full Text Available The stochastic nature of pitting corrosion of metallic structures has been widely recognized. It is assumed that this kind of deterioration retains no memory of the past, so only the current state of the damage influences its future development. This characteristic allows pitting corrosion to be categorized as a Markov process. In this paper, two different models of pitting corrosion, developed using Markov chains, are presented. Firstly, a continuous-time, nonhomogeneous linear growth (pure birth Markov process is used to model external pitting corrosion in underground pipelines. A closed-form solution of the system of Kolmogorov's forward equations is used to describe the transition probability function in a discrete pit depth space. The transition probability function is identified by correlating the stochastic pit depth mean with the empirical deterministic mean. In the second model, the distribution of maximum pit depths in a pitting experiment is successfully modeled after the combination of two stochastic processes: pit initiation and pit growth. Pit generation is modeled as a nonhomogeneous Poisson process, in which induction time is simulated as the realization of a Weibull process. Pit growth is simulated using a nonhomogeneous Markov process. An analytical solution of Kolmogorov's system of equations is also found for the transition probabilities from the first Markov state. Extreme value statistics is employed to find the distribution of maximum pit depths.

  2. Parturition pit: the bony imprint of vaginal birth

    International Nuclear Information System (INIS)

    McArthur, Tatum A.; Meyer, Isuzu; Jackson, Bradford; Pitt, Michael J.; Larrison, Matthew C.

    2016-01-01

    To retrospectively evaluate for pits along the dorsum of the pubic body in females and compare the presence/absence of these pits to vaginal birth data. We retrospectively reviewed females with vaginal birth data who underwent pelvic CT. The presence of pits along the dorsum of the pubic body, pit grade (0 = not present; 1 = faintly imperceptible; 2 = present; 3 = prominent), and the presence of osteitis condensans ilii, preauricular sulcus, and sacroiliac joint vacuum phenomenon were assessed on imaging. Musculoskeletal radiologists who were blinded to the birth data evaluated the CTs. 48 males were also evaluated for the presence of pits. 482 female patients underwent CT pelvis and 171 were excluded due to lack of vaginal birth data. Of the 311 study patients, 262 had prior vaginal birth(s) and 194 had pits on CT. Only 7 of the 49 patients without prior vaginal birth had pits. There was a statistically significant association between vaginal birth and presence of pits (p < 0.0001). Patients with more prominent pits (grades 2/3) had a greater number of vaginal births. As vaginal deliveries increased, the odds of having parturition pits greatly increased, adjusting for age and race at CT (p < 0.0001). No males had pits. Our study indicates that parturition pits are associated with prior vaginal birth and should be considered a characteristic of the female pelvis. The lytic appearance of prominent pits on imaging can simulate disease and create a diagnostic dilemma for interpreting radiologists. (orig.)

  3. A parasitic nematode releases cytokinin that controls cell division and orchestrates feeding site formation in host plants.

    Science.gov (United States)

    Siddique, Shahid; Radakovic, Zoran S; De La Torre, Carola M; Chronis, Demosthenis; Novák, Ondřej; Ramireddy, Eswarayya; Holbein, Julia; Matera, Christiane; Hütten, Marion; Gutbrod, Philipp; Anjam, Muhammad Shahzad; Rozanska, Elzbieta; Habash, Samer; Elashry, Abdelnaser; Sobczak, Miroslaw; Kakimoto, Tatsuo; Strnad, Miroslav; Schmülling, Thomas; Mitchum, Melissa G; Grundler, Florian M W

    2015-10-13

    Sedentary plant-parasitic cyst nematodes are biotrophs that cause significant losses in agriculture. Parasitism is based on modifications of host root cells that lead to the formation of a hypermetabolic feeding site (a syncytium) from which nematodes withdraw nutrients. The host cell cycle is activated in an initial cell selected by the nematode for feeding, followed by activation of neighboring cells and subsequent expansion of feeding site through fusion of hundreds of cells. It is generally assumed that nematodes manipulate production and signaling of the plant hormone cytokinin to activate cell division. In fact, nematodes have been shown to produce cytokinin in vitro; however, whether the hormone is secreted into host plants and plays a role in parasitism remained unknown. Here, we analyzed the spatiotemporal activation of cytokinin signaling during interaction between the cyst nematode, Heterodera schachtii, and Arabidopsis using cytokinin-responsive promoter:reporter lines. Our results showed that cytokinin signaling is activated not only in the syncytium but also in neighboring cells to be incorporated into syncytium. An analysis of nematode infection on mutants that are deficient in cytokinin or cytokinin signaling revealed a significant decrease in susceptibility of these plants to nematodes. Further, we identified a cytokinin-synthesizing isopentenyltransferase gene in H. schachtii and show that silencing of this gene in nematodes leads to a significant decrease in virulence due to a reduced expansion of feeding sites. Our findings demonstrate the ability of a plant-parasitic nematode to synthesize a functional plant hormone to manipulate the host system and establish a long-term parasitic interaction.

  4. Data Release Report for Source Physics Experiments 2 and 3 (SPE-2 and SPE-3) Nevada National Security Site

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, Margaret [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site; Obi, Curtis [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site

    2015-01-26

    The second Source Physics Experiment shot (SPE-2) was conducted in Nevada on October 25, 2011, at 1900:00.011623 Greenwich Mean Time (GMT). The explosive source was 997 kilograms (kg) trinitrotoluene (TNT) equivalent of sensitized heavy ammonium fuel oil (SHANFO) detonated at a depth of 45.7 meters (m). The third Source Physics Experiment shot (SPE-3) was conducted in Nevada on July 24, 2012, at 1800:00.44835 GMT. The explosive source was 905 kg TNT equivalent of SHANFO detonated at a depth of 45.8 m. Both shots were recorded by an extensive set of instrumentation that includes sensors both at near-field (less than 100 m) and far-field (100 m or greater) distances. The near-field instruments consisted of three-component accelerometers deployed in boreholes at 15, 46, and 55 m depths around the shot and a set of single-component vertical accelerometers on the surface. The far-field network was composed of a variety of seismic and acoustic sensors, including short-period geophones, broadband seismometers, three-component accelerometers, and rotational seismometers at distances of 100 m to 25 kilometers. This report coincides with the release of these data for analysts and organizations that are not participants in this program. This report describes the second and third Source Physics Experiment shots and the various types of near-field and far-field data that are available.

  5. Salmon Site Remedial Investigation Report

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  6. Some questions on small uranium open-pit mines

    International Nuclear Information System (INIS)

    Li Junyi

    1992-01-01

    The experiences of the existing uranium open pits are summarized and the questions in design, erection and production are analyzed. It is important helpful to develop and to design such economical and reasonable small uranium open pits

  7. Application of Surpac and Whittle Software in Open Pit Optimisation ...

    African Journals Online (AJOL)

    Application of Surpac and Whittle Software in Open Pit Optimisation and Design. ... This paper studies the Surpac and Whittle software and their application in designing an optimised pit. ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  8. The Application of Foundation Pit Monitoring Technology to the Excavation

    Directory of Open Access Journals (Sweden)

    Qiu Jin

    2015-01-01

    Full Text Available The foundation pit monitoring plays an important role in the foundation pit supporting projects especially in those deep foundation pit projects. Through the whole monitoring of the foundation pit construction from the excavation to the backfill, we can learn about the forcing and deforming process of the foundation pit supporting system, and grasp the impact of external condition changes on the foundation pit. This paper takes a project in Jinan as an example to establish a specific monitoring program, and then conducts the analysis and evaluation of the monitoring data; the real-time grasp of the foundation pit deformation and internal force changes can help to further ensure the security status of the foundation pit, thus better guiding the construction.

  9. Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

    Energy Technology Data Exchange (ETDEWEB)

    Darr, Paul S. [US Department of Energy, Washington, DC (United States). Office of Legacy Management

    2016-01-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of the cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.

  10. Pit slope manual chapter 3. Mechanical properties

    Energy Technology Data Exchange (ETDEWEB)

    Gyenge, M.; Herget, G.

    1977-01-01

    Guidance is given on the procedures required to obtain adequate knowledge of the mechanical properties of the soils and rocks which constitute the walls of the pit. The reason why certain data is necessary is explained and the tests required to obtain these data are described.

  11. The cuisine of the Pitted Ware Culture

    DEFF Research Database (Denmark)

    Philippsen, Bente; Persson, Per

    The Pitted Ware Culture is a Middle Neolithic culture in southwestern Scandinavia. It appears about thousand years after the introduction of agriculture to this area. In some regions, it is characterized by an almost fully “Mesolithic” economy with a heavy reliance on seal hunting. In Djursland, ...

  12. Extracting Valuable Data from Classroom Trading Pits

    Science.gov (United States)

    Bergstrom, Theodore C.; Kwok, Eugene

    2005-01-01

    How well does competitive theory explain the outcome in experimental markets? The authors examined the results of a large number of classroom trading experiments that used a pit-trading design found in Experiments with Economic Principles, an introductory economics textbook by Bergstrom and Miller. They compared experimental outcomes with…

  13. Evaluation of PIT-tagging in cyprinids

    DEFF Research Database (Denmark)

    Skov, Christian; Brodersen, J.; Brönmark, C.

    2005-01-01

    Laboratory and field experiments were used to investigate how different marking procedures, with 23 mm PIT (passive integrated transponders) - tags. affected mortality, body condition and tag expulsion in small roach Rutilus rutilus and rudd Scardinus erythrophthalmus (117 to 163 mm total length...

  14. COPPER PITTING CORROSION: A CASE STUDY

    Science.gov (United States)

    Localized or pitting corrosion of copper pipes used in household drinking-water plumbing is a problem for many water utilities and their customers. Extreme attack can lead to pinhole water leaks that may result in water damage, mold growth, and costly repairs. Water quality has b...

  15. Modelling the filling rate of pit latrines

    African Journals Online (AJOL)

    2012-09-18

    Sep 18, 2012 ... the transfer of water into and out of the pit, biological trans- formations, and pathogen die-off (Buckley et al., 2008). .... formations that consumed or generated it. However, the age distribution of the originally deposited unbiodegradable mate- rial depends only on the deposition history, as it undergoes no.

  16. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    International Nuclear Information System (INIS)

    2011-01-01

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location

  17. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    Energy Technology Data Exchange (ETDEWEB)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    2011-06-20

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location

  18. Open Pit Water Control Safety A Case Of Nchanga Open Pit Mine Zambia

    Directory of Open Access Journals (Sweden)

    Silwamba C

    2015-08-01

    Full Text Available Abstract Mining in Chingola Zambia started underground in 1931 and was catastrophically flooded and closed. The present Nchanga Underground Mine NUG started in 1937. The Nchanga Open Pit NOP mine started in 1955 situated to the west of NUG and partially overlying it. Open pit water control safety operations in the Nchanga-Chingola area have successfully enabled the safe extraction of millions of tonnes of copper ore annually over the past 60 years from NUG mining as well as the NOP. At the start Nchanga mining license surface already had NUG and many watershed divides with the Nchanga and Chingola streams being the main streams feeding into Zambias second largest river Kafue river and 42 of the year was characterised by heavy rains ranging between 800mm to 1300mm per annum. In this paper the presence of very significant amounts of seasonal rain and subsurface water in the mining area was identified as both a curse and a blessing. An excess in seasonal rain and subsurface water would disrupt both open pit and underground mining operations. In order for NOP to be operated successfully stable and free from flooding coping water management tactics were adopted from 1955 to 2015 including 1. Underground mine pump chamber pumping system 2. Piezometer instrumented boreholes 3. Underground mine 1500-ft sub-haulage east borehole dewatering beneath the open pit 4. Nchanga and Chingola stream diversionary tunnel and open drains 5. Nchanga stream causeway and embankment dam in the Matero School Golf Club area 6. Pit perimeter borehole pumping 7. Outer and inner pit perimeter drains and bund walls 8. In-pit ramp side drains 9. In-pit sub-horizontal borehole geo-drains and water and 10. Pit bottom sump pumps. Application of grout curtains along the Vistula River Poland was noted as a possibility in the right circumstances although it had never been used at Nchanga Open Pit. An additional conclusion was that forward health safety and environmental end

  19. Data Release Report for Source Physics Experiments 2 and 3 (SPE-2 and SPE-3) Nevada National Security Site

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, Margaret [National Security Technologies, LLC. (NSTec), Las Vegas, NV (United States); Obi, Curtis [National Security Technologies, LLC. (NSTec), Las Vegas, NV (United States)

    2015-04-30

    The second Source Physics Experiment shot (SPE-2) was conducted in Nevada on October 25, 2011, at 1900:00.011623 Greenwich Mean Time (GMT). The explosive source was 997 kilograms (kg) trinitrotoluene (TNT) equivalent of sensitized heavy ammonium fuel oil (SHANFO) detonated at a depth of 45.7 meters (m). The third Source Physics Experiment shot (SPE-3) was conducted in Nevada on July 24, 2012, at 1800:00.44835 GMT. The explosive source was 905 kg TNT equivalent of SHANFO detonated at a depth of 45.8 m. Both shots were recorded by an extensive set of instrumentation that includes sensors both at near-field (less than 100 m) and far-field (100 m or greater) distances. The near-field instruments consisted of three-component accelerometers deployed in boreholes at 15, 46, and 55 m depths around the shot and a set of single-component vertical accelerometers on the surface. The far-field network was composed of a variety of seismic and acoustic sensors, including short-period geophones, broadband seismometers, three-component accelerometers, and rotational seismometers at distances of 100 m to 25 kilometers. This report coincides with the release of these data for analysts and organizations that are not participants in this program. This report describes the second and third Source Physics Experiment shots and the various types of near-field and farfield data that are available.This revised document includes reports on baseline shift corrections for the SPE-2 and SPE-3 shots that were missing from the original January 2015 version.

  20. Observation of the molecular organization of calcium release sites in fast- and slow-twitch skeletal muscle with nanoscale imaging.

    Science.gov (United States)

    Jayasinghe, Isuru D; Munro, Michelle; Baddeley, David; Launikonis, Bradley S; Soeller, Christian

    2014-10-06

    Localization microscopy is a fairly recently introduced super-resolution fluorescence imaging modality capable of achieving nanometre-scale resolution. We have applied the dSTORM variation of this method to image intracellular molecular assemblies in skeletal muscle fibres which are large cells that critically rely on nanoscale signalling domains, the triads. Immunofluorescence staining in fixed adult rat skeletal muscle sections revealed clear differences between fast- and slow-twitch fibres in the molecular organization of ryanodine receptors (RyRs; the primary calcium release channels) within triads. With the improved resolution offered by dSTORM, abutting arrays of RyRs in transverse view of fast fibres were observed in contrast to the fragmented distribution on slow-twitch muscle that were approximately 1.8 times shorter and consisted of approximately 1.6 times fewer receptors. To the best of our knowledge, for the first time, we have quantified the nanometre-scale spatial association between triadic proteins using multi-colour super-resolution, an analysis difficult to conduct with electron microscopy. Our findings confirm that junctophilin-1 (JPH1), which tethers the sarcoplasmic reticulum ((SR) intracellular calcium store) to the tubular (t-) system at triads, was present throughout the RyR array, whereas JPH2 was contained within much smaller nanodomains. Similar imaging of the primary SR calcium buffer, calsequestrin (CSQ), detected less overlap of the triad with CSQ in slow-twitch muscle supporting greater spatial heterogeneity in the luminal Ca2+ buffering when compared with fast twitch muscle. Taken together, these nanoscale differences can explain the fundamentally different physiologies of fast- and slow-twitch muscle. © 2014 The Author(s) Published by the Royal Society. All rights reserved.

  1. Analysis of the Potential for Use of Floating Photovoltaic Systems on Mine Pit Lakes: Case Study at the Ssangyong Open-Pit Limestone Mine in Korea

    Directory of Open Access Journals (Sweden)

    Jinyoung Song

    2016-02-01

    Full Text Available Recently, the mining industry has introduced renewable energy technologies to resolve power supply problems at mines operating in polar regions or other remote areas, and to foster substitute industries, able to benefit from abandoned sites of exhausted mines. However, little attention has been paid to the potential placement of floating photovoltaic (PV systems operated on mine pit lakes because it was assumed that the topographic characteristics of open-pit mines are unsuitable for installing any type of PV systems. This study analyzed the potential of floating PV systems on a mine pit lake in Korea to break this misconception. Using a fish-eye lens camera and digital elevation models, a shading analysis was performed to identify the area suitable for installing a floating PV system. The layout of the floating PV system was designed in consideration of the optimal tilt angle and array spacing of the PV panels. The System Advisor Model (SAM by National Renewable Energy Laboratory, USA, was used to conduct energy simulations based on weather data and the system design. The results indicated that the proposed PV system could generate 971.57 MWh/year. The economic analysis (accounting for discount rate and a 20-year operational lifetime showed that the net present value would be $897,000 USD, and a payback period of about 12.3 years. Therefore, we could know that the economic effect of the floating PV system on the mine pit lake is relatively higher than that of PV systems in the other abandoned mines in Korea. The annual reduction of greenhouse gas emissions was analyzed and found to be 471.21 tCO2/year, which is twice the reduction effect achieved by forest restoration of an abandoned mine site. The economic feasibility of a floating PV system on a pit lake of an abandoned mine was thus established, and may be considered an efficient reuse option for abandoned mines.

  2. Laboratory protocols for testing the efficacy of commercial pit latrine ...

    African Journals Online (AJOL)

    There is considerable national interest in the use of commercial microbially derived products for controlling the rate of accumulation of the contents of pit latrines. Manufacturers claim that some of these products can reduce accumulation rates, prevent the pit from ever filling up, or even result in decreases in pit contents ...

  3. Congenital pits of the optic nerve head and retinochoroidal colobomas.

    Science.gov (United States)

    Brown, G C; Augsburger, J J

    1980-07-01

    A 45-year-old man presented with bilateral retinochoroidal colobomas associated with an inferonasal congenital pit of the optic nerve head in each eye. Different theories on the origin of such pits are discussed. This case supports the theory that some congenital optic pits occur as a result of failure of closure of the superior end of the embryonic fissure.

  4. Interacting Effects Induced by Two Neighboring Pits Considering Relative Position Parameters and Pit Depth

    Directory of Open Access Journals (Sweden)

    Yongfang Huang

    2017-04-01

    Full Text Available For pre-corroded aluminum alloy 7075-T6, the interacting effects of two neighboring pits on the stress concentration are comprehensively analyzed by considering various relative position parameters (inclination angle θ and dimensionless spacing parameter λ and pit depth (d with the finite element method. According to the severity of the stress concentration, the critical corrosion regions, bearing high susceptibility to fatigue damage, are determined for intersecting and adjacent pits, respectively. A straightforward approach is accordingly proposed to conservatively estimate the combined stress concentration factor induced by two neighboring pits, and a concrete application example is presented. It is found that for intersecting pits, the normalized stress concentration factor Ktnor increases with the increase of θ and λ and always reaches its maximum at θ = 90°, yet for adjacent pits, Ktnor decreases with the increase of λ and the maximum value appears at a slight asymmetric location. The simulations reveal that Ktnor follows a linear and an exponential relationship with the dimensionless depth parameter Rd for intersecting and adjacent cases, respectively.

  5. Inhibition of the ultrasonic microjet-pits on the carbon steel in the particles-water mixtures

    Science.gov (United States)

    Yan, Dayun; Wang, Jiadao; Liu, Fengbin

    2015-07-01

    In the incubation period of ultrasonic cavitation, due to the impact of microjets on the material surface, the needle-like microjet-pits are formed. Because the formation of microjet-pits relates with the evolution of cavitation erosion on engineering materials, corresponding study will promote the understanding on the mechanism of cavitation erosion. However, little study on the microjet-pits has been carried out, especially in the particles-water mixture. In this study, we firstly demonstrated the microjet-pits on the carbon steel would be significantly inhibited by Al particles in water. Such inhibition effect indicated that particular particles might not only provide growth sites for cavitation bubbles but also affect the collapse of cavitation bubbles near a solid surface. Our study deepened the understanding on the ultrasonic cavitation erosion in the particles-water mixture.

  6. Inhibition of the ultrasonic microjet-pits on the carbon steel in the particles-water mixtures

    Directory of Open Access Journals (Sweden)

    Dayun Yan

    2015-07-01

    Full Text Available In the incubation period of ultrasonic cavitation, due to the impact of microjets on the material surface, the needle-like microjet-pits are formed. Because the formation of microjet-pits relates with the evolution of cavitation erosion on engineering materials, corresponding study will promote the understanding on the mechanism of cavitation erosion. However, little study on the microjet-pits has been carried out, especially in the particles-water mixture. In this study, we firstly demonstrated the microjet-pits on the carbon steel would be significantly inhibited by Al particles in water. Such inhibition effect indicated that particular particles might not only provide growth sites for cavitation bubbles but also affect the collapse of cavitation bubbles near a solid surface. Our study deepened the understanding on the ultrasonic cavitation erosion in the particles-water mixture.

  7. Assessment of trace ground-water contaminants release from south Texas in-situ uranium solution-mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Kidwell, J.R.; Humenick, M.J.

    1981-01-01

    The future of uranium solution mining in south Texas depends heavily on the industry's ability to restore production zone ground water to acceptable standards. This study investigated the extent of trace contaminant solubilization during mining and subsequent restoration attempts, first through a literature search centered on uranium control mechanisms, and then by laboratory experiments simulating the mining process. The literature search indicated the complexity of the situation. The number of possible interactions between indigenous elements and materials pointed on the site specificity of the problem. The column studies evaluated three different production area ores. Uranium, molybdenum, arsenic, vanadium, and selenium were analyzed in column effluents. After simulated mining operations were completed, uranium was found to be the most persistent trace element. However, subsequent ground water flushing of the columns could restore in-situ water to EPA recommended drinking water concentrations. Limited data indicated that ground water flowing through mined areas may solubilize molybdenum present in down gradient areas adjacent to the production zone due to increased oxidation potential of ground water if adequate restoration procedures are not followed.

  8. Ecotoxicological screen of Potential Release Site 50-006(d) of Operable Unit 1147 of Mortandad Canyon and relationship to the Radioactive Liquid Waste Treatment Facilities project

    International Nuclear Information System (INIS)

    Gonzales, G.J.; Newell, P.G.

    1996-04-01

    Potential ecological risk associated with soil contaminants in Potential Release Site (PRS) 50-006(d) of Mortandad Canyon at the Los Alamos National Laboratory was assessed by performing an ecotoxicological risk screen. The PRS surrounds Outfall 051, which discharges treated effluent from the Radioactive Liquid Waste Treatment Facility. Discharge at the outfall is permitted under the Clean Water Act National Pollution Discharge Elimination System. Radionuclide discharge is regulated by US Department of Energy (DOE) Order 5400.5. Ecotoxicological Screening Action Levels (ESALSs) were computed for nonradionuclide constituents in the soil, and human risk SALs for radionuclides were used as ESALs. Within the PRS and beginning at Outfall 051, soil was sampled at three points along each of nine linear transects at 100-ft intervals. Soil samples from 3 depths for each sampling point were analyzed for the concentration of a total of 121 constituents. Only the results of the surface sampling are reported in this report

  9. Determination of experimental parameters for evaluating the release of contaminants and their interaction with the environment at a waste disposal site

    International Nuclear Information System (INIS)

    Balzamo, S.; De Angelis, G.; Marchetti, A.

    1991-01-01

    A research programme has been undertaken at ENEA with the financial support of the Ministry for the Environment in the aim at evaluating the environmental impact of hazardous waste disposal. Experimental tests have been carried out in order to obtain a series of data on which models for the prediction of future contamination are based, in the frame of such programme. The release of toxic elements from solidified wastes, as well as the release mechanisms, were evaluated. The interaction between conditioned wastes and soil was assessed in laboratory, scale with the help of lysimeters using siliceous sand or natural pozzolan as simulants of ground soil. Moreover the relative mobility of different cation travelling through the soil was determined by measuring the linear distribution coefficient. Finally the permeabilities of both conditioned waste (k w ) and backfill material (k b ) were taken into account and related to each other. Due to the strict relationship existing between water permeability and cement capillary pores, measurement of cement porosity by Mercury intrusion porosimetry were also performed. The general conclusion of the research work was the validity of the data obtained needs to be confirmed by on site tests. (au)

  10. The phenomenon of prehistoric ritual pits: Several examples from the central Balkans

    Directory of Open Access Journals (Sweden)

    Bulatović Aleksandar P.

    2015-01-01

    rituals. Many authors who concern themselves with this topic concur that the context of a pit and the objects within it, the choice of offerings and their symbolism, along with the pit’s stratigraphy and other patterns observed in it, are in fact the features that make it distinct, i.e. ritual. Similar pits are known throughout history and their descriptions can be found in ancient written sources, as well as identified in the field, with certain differences, stretching back all the way into deep prehistory. This paper presents several newly discovered ritual pits in the central Balkans from the Eneolithic, Bronze and Iron Age, and additionally mentions some of the previously published pits from the area and its near and more distant surroundings. In the course of recent investigations conducted at the site of Bubanj, two ritual pits were recorded in the Early Eneolithic horizon of the Bubanj-Hum I culture. Next to the first, shallower (up to 0.2 m, oval shaped pit, of around 2.5 m long and 1.7 m wide, an oven was noted, while the pit was filled with whole vessels, parts of grindstones, chipped and polished stone tools, baked clay, animal bones, etc. (Figs. 1, 2; Pl. I. Two smaller hollows were noted in the northern part of the pit, while several postholes, which might have supported some kind of roof or shelter construction, were detected somewhat deeper in the subsoil, around the oven and the pit. Below this pit, a smaller one was noted, around 0.7 m deep and with a base diameter of about 1.2 m, filled with yellow, sandy, refined soil. The bottom of the pit was dug to the level of the subsoil and levelled. The second ritual pit from Bubanj was considerably deeper (around 1.5 m and approximately 1.7 m in diameter, with baked walls and filled with red ashy soil. It contained fragmented or whole vessels, chipped stone tools, a part of an altar, an air nozzle (tuyиres, a polished stone axe, tools made of horn, a fragment of a grindstone, pebbles, house daub and animal

  11. Reduction of exit-site infections of tunnelled intravascular catheters among neutropenic patients by sustained-release chlorhexidine dressings: results from a prospective randomized controlled trial.

    Science.gov (United States)

    Chambers, S T; Sanders, J; Patton, W N; Ganly, P; Birch, M; Crump, J A; Spearing, R L

    2005-09-01

    Exit-site and tunnel infections of tunnelled central intravascular catheters are a frequent source of morbidity among neutropenic patients and may necessitate catheter removal. They require antimicrobial therapy that increases healthcare costs and is associated with adverse drug reactions. A prospective randomized clinical trial was conducted among adult patients undergoing chemotherapy in a haematology unit. Tunnelled intravascular catheters were randomized to receive the control of a standard dressing regimen as recommended by the British Committee for Standards in Haematology, or to receive the intervention of a sustained-release chlorhexidine dressing. Follow-up data were available in 112 of 114 tunnelled intravascular catheters which were randomized. Exit-site or combined exit-site/tunnel infections occurred in 23 (43%) of 54 catheters in the control group, and five (9%) of 58 catheters in the intervention group [odds ratio (OR) for intervention group compared with control group =0.13, 95% confidence intervals (CI) 0.04-0.37, P<0.001]. More tunnelled intravascular catheters were prematurely removed from the control group than the intervention group for documented infections [20/54 (37%) vs 6/58 (10%), OR=0.20, 95%CI 0.53-0.07]. However, there was no difference in the numbers of tunnelled intravascular catheters removed for all proven and suspected intravascular catheter-related infections [21/54 (39%) vs 19/58 (33%)], or in the time to removal of catheters for any reason other than death or end of treatment for underlying disease. Thus chlorhexidine dressings reduced the incidence of exit-site/tunnel infections of indwelling tunnelled intravascular catheters without prolonging catheter survival in neutropenic patients, and could be considered as part of the routine management of indwelling tunnelled intravascular catheters among neutropenic patients.

  12. Analysis of BY-106 pump pit cover plate

    International Nuclear Information System (INIS)

    Coverdell, B.L.

    1994-01-01

    A new cover for the pump pit of Tank 241-BY-106 has been designed to allow the rotary core exhauster to be hooked up without requiring pit entry, riser modification, or equipment removal. The new pit cover is necessary to allow installation of two risers for reducing exposure, contamination, and waste. Computer analysis indicates that the safety margin of the pit cover plate with two risers is adequate. The computer stress model and input files are attached. The pit cover plate is a replacement for an existing plate; therefore seismic and wind loads were considered for the plate only

  13. Optic disc pit with sectorial retinitis pigmentosa.

    Science.gov (United States)

    Balikoglu-Yilmaz, Melike; Taskapili, Muhittin; Yilmaz, Tolga; Teke, Mehmet Yasin

    2013-01-01

    Sectorial retinitis pigmentosa (RP) and optic disc pit (ODP) are rare clinical conditions. We present a 40-year-old woman with a history of mild night blindness and decreased vision in the right eye for about 5 years. Fundus examination revealed retinal pigmentary changes in the superior and inferotemporal sectors covering the macula and reduced arterial calibre and ODP at the temporal edge of the optic disc. In addition, fundus autofluorescence, spectral-domain optical coherence tomography, fluorescein angiography, and multifocal electroretinogram scans confirmed these clinical findings. Visual acuity was decreased due to an atrophic-appearing foveal lesion. No intervention was suggested because of the poor visual potential. To the best of our knowledge, the present study is the first to describe coexistent optic disc pit and sectorial RP in the superior and inferotemporal sectors covering the macula in the same eye with figures.

  14. Optic Disc Pit with Sectorial Retinitis Pigmentosa

    Directory of Open Access Journals (Sweden)

    Melike Balikoglu-Yilmaz

    2013-01-01

    Full Text Available Sectorial retinitis pigmentosa (RP and optic disc pit (ODP are rare clinical conditions. We present a 40-year-old woman with a history of mild night blindness and decreased vision in the right eye for about 5 years. Fundus examination revealed retinal pigmentary changes in the superior and inferotemporal sectors covering the macula and reduced arterial calibre and ODP at the temporal edge of the optic disc. In addition, fundus autofluorescence, spectral-domain optical coherence tomography, fluorescein angiography, and multifocal electroretinogram scans confirmed these clinical findings. Visual acuity was decreased due to an atrophic-appearing foveal lesion. No intervention was suggested because of the poor visual potential. To the best of our knowledge, the present study is the first to describe coexistent optic disc pit and sectorial RP in the superior and inferotemporal sectors covering the macula in the same eye with figures.

  15. Optic Disc Pit with Sectorial Retinitis Pigmentosa

    OpenAIRE

    Balikoglu-Yilmaz, Melike; Taskapili, Muhittin; Yilmaz, Tolga; Teke, Mehmet Yasin

    2013-01-01

    Sectorial retinitis pigmentosa (RP) and optic disc pit (ODP) are rare clinical conditions. We present a 40-year-old woman with a history of mild night blindness and decreased vision in the right eye for about 5 years. Fundus examination revealed retinal pigmentary changes in the superior and inferotemporal sectors covering the macula and reduced arterial calibre and ODP at the temporal edge of the optic disc. In addition, fundus autofluorescence, spectral-domain optical coherence tomography, ...

  16. Pitting corrosion resistant austenite stainless steel

    Science.gov (United States)

    van Rooyen, D.; Bandy, R.

    A pitting corrosion resistant austenite stainless steel comprises 17 to 28 wt. % chromium, 15 to 26 wt. % nickel, 5 to 8 wt. % molybdenum, and 0.3 to 0.5 wt. % nitrogen, the balance being iron, unavoidable impurities, minor additions made in the normal course of melting and casting alloys of this type, and may optionally include up to 10 wt. % of manganese, up to 5 wt. % of silicon, and up to 0.08 wt. % of carbon.

  17. Investigating pitting in X65 carbon steel using potentiostatic polarisation

    Science.gov (United States)

    Mohammed, Sikiru; Hua, Yong; Barker, R.; Neville, A.

    2017-11-01

    Although pitting corrosion in passive materials is generally well understood, the growth of surface pits in actively-corroding materials has received much less attention to date and remains poorly understood. One of the key challenges which exists is repeatedly and reliably generating surface pits in a practical time-frame in the absence of deformation and/or residual stress so that studies on pit propagation and healing can be performed. Another pertinent issue is how to evaluate pitting while addressing general corrosion in low carbon steel. In this work, potentiostatic polarisation was employed to induce corrosion pits (free from deformation or residual stress) on actively corroding X65 carbon steel. The influence of applied potential (50 mV, 100 mV and 150 mV vs open circuit potential) was investigated over 24 h in a CO2-saturated, 3.5 wt.% NaCl solution at 30 °C and pH 3.8. Scanning electron microscopy (SEM) was utilised to examine pits, while surface profilometry was conducted to measure pit depth as a function of applied potential over the range considered. Analyses of light pitting (up to 120 μm) revealed that pit depth increased linearly with increase in applied potential. This paper relates total pit volume (measured using white light interferometry) to dissipated charge or total mass loss (using the current response for potentiostatic polarisation in conjunction with Faraday's law). By controlling the potential of the surface (anodic) the extent of pitting and general corrosion could be controlled. This allowed pits to be evaluated for their ability to continue to propagate after the potentiostatic technique was employed. Linear growth from a depth of 70 μm at pH 3.8, 80 °C was demonstrated. The technique offers promise for the study of inhibition of pitting.

  18. Optimization of the seismic pit of the Tokamak building of ITER

    International Nuclear Information System (INIS)

    Beltran, F.; Combescure, D.; Hanna, G.; Ezeberry, J.

    2010-01-01

    The Tokamak Complex of ITER is the structure housing the Tokamak machine, the Tritium building and the Diagnostic building. This structure, with a plan of about 120 x 80 m, will be built with a base isolation system formed with over 500 steel reinforced neoprene pads. The pads will be mounted on top of short columns or plinths, supported by a bottom basemat resting directly on rock. Foundation level is about 20 m below grade level. Consequently, a ground supporting system, such as retaining walls, is required to protect the structure. The walls, together with the basemat, form the seismic pit of the Tokamak Complex. After the initial design of the seismic pit walls and basemat was closed, a new report on the water table levels to be expected for different return periods was issued. The report introduced a substantial reduction of ground water levels with respect to the previous design basis. Following this reduction, a new design for the seismic pit walls and basemat was developed. The goal was to introduce the new optimized design as an alternative in the Call for Tenders related to the construction of the seismic pit. The design of the seismic pit is governed by the seismic action, even though the whole pit is embedded in a limestone rock of medium to good quality. For optimizing the design, a review of geotechnical parameters has been carried out first, using the huge body of information generated after more than 20 years of site investigation. Afterwards, seismic thrusts on the walls have been computed using different procedures, from conventional rock wedged equilibrium analyses to more sophisticated techniques based on the interaction of discrete blocks configuring the rock massif. In addition, internal forces and moments have been determined at the basemat from the ground deformation parameters, using finite element models. Finally, steel reinforcement has been obtained for the several sections of the retaining walls and the basemat, complying with the

  19. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A

    International Nuclear Information System (INIS)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-01-01

    This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest

  20. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A

    Energy Technology Data Exchange (ETDEWEB)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-07-01

    This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from

  1. Influence of Pitting Corrosion on Fatigue and Corrosion Fatigue of Ship and Offshore Structures, Part II: Load - Pit - Crack Interaction

    Directory of Open Access Journals (Sweden)

    Jakubowski Marek

    2015-09-01

    Full Text Available In the paper has been discussed influence of stresses on general corrosion rate and corrosion pit nucleation rate and growth , whose presence has been questioned by some authors but accepted by most of them. Influence of roughness of pit walls on fatigue life of a plate suffering pit corrosion and presence of the so called „ non-damaging” pits which never lead to initiation of fatigue crack, has been presented. Possibility of prediction of pit-to-crack transition moment by two different ways, i.e. considering a pit a stress concentrator or an equivalent crack, has been analyzed. Also, influence of statistical distribution of depth of corrosion pits as well as anticorrosion protection on fatigue and corrosion fatigue has been described.

  2. Burn Pit Emissions Exposure and Respiratory and Cardiovascular Conditions Among Airborne Hazards and Open Burn Pit Registry Participants.

    Science.gov (United States)

    Liu, Jason; Lezama, Nicholas; Gasper, Joseph; Kawata, Jennifer; Morley, Sybil; Helmer, Drew; Ciminera, Paul

    2016-07-01

    The aim of this study was to determine how burn pit emissions exposure is associated with the incidence of respiratory and cardiovascular conditions. We examined the associations between assumed geographic and self-reported burn pit emissions exposure and respiratory and cardiovascular outcomes in participants of the Airborne Hazards and Open Burn Pit Registry. We found significant dose-response associations for higher risk of self-reported emphysema, chronic bronchitis, or chronic obstructive pulmonary disease with increased days of deployment within 2 miles of selected burn pits (P-trend = 0.01) and self-reported burn pit smoke exposure (P-trend = 0.0005). We found associations between burn pit emissions exposure and higher incidence of post-deployment self-reported respiratory and cardiovascular conditions, but these findings should be interpreted with caution because the surrogate measurements of burn pit emissions exposure in this analysis may not reflect individual exposure levels.

  3. Weldon Spring Site Environmental Report for calendar year 1994

    International Nuclear Information System (INIS)

    1995-05-01

    This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels

  4. Clinico epidemiological study of pitted keratolysis

    Directory of Open Access Journals (Sweden)

    Naik Chandra

    2007-01-01

    Full Text Available Background: Pitted keratolysis is a common dermatological condition. However, very few studies are available on the clinical characteristics and epidemiological features of this disorder from India and abroad. Materials and Methods: Fifty patients from rural area of Kolar at Sri R.L.J.H. and S.N.R. Hospital, presenting with clinically distinctive lesions of pitted keratolysis were included in the study. Cases were interviewed with particular emphasis on triggering factors and findings were recorded. Investigations like Gram′s stain, culture studies, Wood′s ultraviolet light examination, histopathology etc, was done in selected cases to ascertain the clinical diagnosis. Results: Age of the patients varied from 20 to 40 years in 52% with male preponderance in 82% of cases. Duration of the disease varied from 15 days to five years, most of the patients were bare-footed farmers (62% of cases. Hyperhidrosis and pruritus were most frequently observed symptoms in 70% and 60% of patients. Most of the patients presented with the characteristic pits which varied from 1 to 50 in number in 56 % of cases, located predominantly on the pressure bearing areas in 92% of cases and depth of the pits varied from 1 to 2 mm in 60% of cases. Associated skin conditions recorded in present study were fissuring of soles in 38%, psoriasis 10%, dermatophyte infections in 6%, planter warts 6% and Corynebacterial triad and corn in 2% of patients each. Discussion: Affection of bare-footed individuals, male preponderance, presence of hyperhidrosis and occurrence of lesions over pressure bearing areas of soles, observed in the present study were consistent with earlier studies on the subject. However, pruritus as commonest presenting symptom reported by 60% patients in the present study, has not been documented in the previous studies. Conclusion: Pitted keratolysis is fairly common in bare footed male farmers of rural India. The condition is predominantly seen over the

  5. A GIS-based, confined aquifer, hypothetical model of ground-water seepage into a former mining open pit

    International Nuclear Information System (INIS)

    Salama, A; Negeed, E.R.

    2010-01-01

    Groundwater seepage into a former mining site in Egypt is proposed for simulation. This site was used for basalt extraction. After the mining activities had stopped a large open pit was left over and groundwater seeped into the pit forming a lake. The pit has a dimension of approximately 1200 x 600 x 30 m. Because of the lack of field data, several scenarios may be hypothesized to explain the filling of these open pits with water. In this paper, one of these scenarios is studied. It is suggested that this water comes from an underneath confined aquifer. Through fractures in the host rock, water seeped upwards into the open pit. To estimate the rate at which water seeps into the lake, numerical study based on the finite element method is performed. Firstly, geo-referencing of the site was performed using GIS. The boundary of the lake was then digitized and elevation contours was defined. These data was then imported into grid-builder software to generate a two-dimensional triangular mesh which was then used by hydro-geosphere software to build the three-dimensional mesh and solve the problem. It was found that the set of discrete fractures was insufficient to fill the lake in the time span that was actually elapsed to fill up the lake which is on the order of two to three years.

  6. Generated carrier dynamics in V-pit enhanced InGaN/GaN light emitting diode

    KAUST Repository

    Ajia, Idris A.

    2017-12-18

    We investigate the effects of V-pits on the optical properties of a state-of-the art highly efficient, blue InGaN/GaN multi-quantum-well (MQW) light emitting diode (LED) with high internal quantum efficiency (IQE) of > 80%. The LED is structurally enhanced by incorporating pre-MQW InGaN strain-relief layer with low InN content and patterned sapphire substrate. For comparison, a conventional (unenhanced) InGaN/GaN MQW LED (with IQE of 46%) grown under similar conditions was subjected to the same measurements. Scanning transmission electron microscopy (STEM) reveals the absence of V-pits in the unenhanced LED, whereas in the enhanced LED, V-pits with {10-11} facets, emerging from threading dislocations (TDs) were prominent. Cathodoluminescence mapping reveals the luminescence properties near the V-pits, showing that the formation of V-pit defects can encourage the growth of defect-neutralizing barriers around TD defect states. The diminished contribution of TDs in the MQWs allows indium-rich localization sites to act as efficient recombination centers. Photoluminescence and time-resolved spectroscopy measurements suggest that the V-pits play a significant role in the generated carrier rate and droop mechanism, showing that the quantum confined Stark effect is suppressed at low generated carrier density, after which the carrier dynamics and droop are governed by the carrier overflow effect.

  7. Corrosion and inhibition of stainless steel pitting corrosion in alkaline medium and the effect of Cl- and Br- anions

    International Nuclear Information System (INIS)

    Refaey, S.A.M.; Taha, F.; El-Malak, A.M. Abd

    2005-01-01

    The effect of carbonate anion on the pitting corrosion and inhibition behavior of stainless steel samples (304L SS and 316L SS) has been studied using potentiodynamic and scanning electron microscope (SEM) techniques. The effect of concentration of CO 3 2- ions, pH, potential scanning rate and the composition of stainless steel are discussed. Additions of Cl - and Br - ions into the carbonate solution increase the anodic dissolution of stainless steel and decrease its pitting corrosion resistance. The effect of CO 3 2- anion on the inhibition of chloride and bromide pitting corrosion of the two stainless steel types has been studied also. Pitting corrosion decrease with the increasing of sodium carbonate concentration, i.e. increases the resistance of stainless steels towards the chloride and bromide pitting corrosion. This inhibition effect argued to formation of [Fe,Cr]CO 3 film caused by preferential adsorption of the CO 3 2- ion, leading to instantaneous repair of weak sites for pit nucleation

  8. PCR-RFLP analyses for studying the diversity of GH and Pit-1 genes in Slovak Simmental cattle

    Directory of Open Access Journals (Sweden)

    Anna Trakovická

    2013-10-01

    Full Text Available The aim of this study was evaluation of growth hormone (GH and specific pituitary transcription factor (Pit-1 genes diversity in population of 353 Slovak Simmental cows. The analyses were based on single nucleotide polymorphisms GH/AluI and Pit-1/HinfI detections. A polymorphic site of GH gene (AluI has been linked to differences in circulating metabolites, metabolic hormones and milk yield. Bovine Pit-1 is responsible for pituitary development and hormone secreting gene expression, including GH gene. The Pit-1/HinfI locus was associated with growth, milk production and reproduction performance in cattle. Samples of genomic DNA were analyzed by PCR-RFLP method. Digestion of GH gene PCR products with restriction enzyme AluI revealed allele L and V with frequency 0.695 and 0.305, respectively. The digested Pit-1 gene PCR products with enzyme HinfI revealed alleles A (0.249 and B (0.751. Dominant genotypes were for GH gene heterozygous LV (0.47 and for Pit-1 gene homozygous BB (0.56 animals. The observed heterozygosity, effective allele numbers and polymorphism information content of GH/AluI and Pit-1/HinfI bovine loci population were 0.42/0.37, 1.73/1.59 and 0.33/0.30, respectively. The median polymorphic information content of loci was also transferred to the higher observed homozygosity in population (0.58/0.63. Keywords: cattle, growth hormone, leptin, PCR, Pit-1, polymorphism.

  9. Communication dated 29 June 2009 received from the Permanent Mission of Kazakhstan with regard to a press release to note a commemorative meeting of the 20th anniversary of shutting down of the Semipalatinsk nuclear testing site

    International Nuclear Information System (INIS)

    2009-01-01

    The Secretariat has received a Note Verbale dated 29 June 2009 from the Permanent Mission of Kazakhstan, transmitting the text of a press release to note a commemorative meeting of the 20th anniversary of shutting down of the Semipalatinsk nuclear testing site, which was held in Semipalatinsk, Kazakhstan on 18 June 2009. As requested in that communication, the abovementioned press release is herewith circulated for the information of all Member States

  10. Detecting pits in tart cherries by hyperspectral transmission imaging

    Science.gov (United States)

    Qin, Jianwei; Lu, Renfu

    2004-11-01

    The presence of pits in processed cherry products causes safety concerns for consumers and imposes potential liability for the food industry. The objective of this research was to investigate a hyperspectral transmission imaging technique for detecting the pit in tart cherries. A hyperspectral imaging system was used to acquire transmission images from individual cherry fruit for four orientations before and after pits were removed over the spectral region between 450 nm and 1,000 nm. Cherries of three size groups (small, intermediate, and large), each with two color classes (light red and dark red) were used for determining the effect of fruit orientation, size, and color on the pit detection accuracy. Additional cherries were studied for the effect of defect (i.e., bruises) on the pit detection. Computer algorithms were developed using the neural network (NN) method to classify the cherries with and without the pit. Two types of data inputs, i.e., single spectra and selected regions of interest (ROIs), were compared. The spectral region between 690 nm and 850 nm was most appropriate for cherry pit detection. The NN with inputs of ROIs achieved higher pit detection rates ranging from 90.6% to 100%, with the average correct rate of 98.4%. Fruit orientation and color had a small effect (less than 1%) on pit detection. Fruit size and defect affected pit detection and their effect could be minimized by training the NN with properly selected cherry samples.

  11. Open Pit Water Control Safety A Case Of Nchanga Open Pit Mine Zambia

    OpenAIRE

    Silwamba C; Chileshe P R K

    2015-01-01

    Abstract Mining in Chingola Zambia started underground in 1931 and was catastrophically flooded and closed. The present Nchanga Underground Mine NUG started in 1937. The Nchanga Open Pit NOP mine started in 1955 situated to the west of NUG and partially overlying it. Open pit water control safety operations in the Nchanga-Chingola area have successfully enabled the safe extraction of millions of tonnes of copper ore annually over the past 60 years from NUG mining as well as the NOP. At the st...

  12. Environmental assessments for the existing radioactive materials in the Weldon Spring raffinate pits

    International Nuclear Information System (INIS)

    Yang, J.Y.; Wang, J.

    1985-01-01

    Various radioactive residues (raffinates) and wastes from the processing of uranium and thorium between 1957 and 1966 are stored in four pits at Weldon Spring, Missouri. The US Department of Energy (DOE) plans to stabilize all the contaminated materials on a long-term (more than 1000-year) basis. The effectiveness of stabilization measures are evaluated by estimating radioactive releases under two options: (1) no action, and (2) improved containment using the existing raffinate pits. Two major pathways of radiation exposure are examined: (1) airborne radioactive gases and particulates, and (2) seepage into near-surface groundwater. The relative reductions of releases into the air and groundwater for a reference stabilization option (improved containment) are analyzed using mathematical models for radioactive and particulate gas fluxes and atmospheric dispersion, as well as groundwaterr transport and dispersion. The consequent health risks for nearby individuals and the general public are also evaluated. This study focuses on the migration of radionuclides under existing conditions and evaluates the effectiveness of proposed stabilization measures at the pits. Results indicate that the potential effects to the general public would be insignificant. 22 refs., 2 figs., 6 tabs

  13. Application for approval of derived authorized limits for the release of the 190-C trenches and 105-C process water tunnels at the Hanford Site: Volume 2 - source term development

    International Nuclear Information System (INIS)

    Denham, D.H.; Winslow, S.L.; Moeller, M.P.; Kennedy, W.E. Jr.

    1997-03-01

    As part of environmental restoration activities at the Hanford Site, Bechtel Hanford, Inc. is conducting a series of evaluations to determine appropriate release conditions for specific facilities following the completion of decontamination and decommissioning projects. The release conditions, with respect to the residual volumetric radioactive contamination, are termed authorized limits. This report presents the summary of the supporting information and the final application for approval of derived authorized limits for the release of the 190-C trenches and the 105-C process water tunnels. This document contains two volumes; this volume (Vol. 2) contains the radiological characterization data, spreadsheet analyses, and radiological source terms

  14. Gamma-ray and surface organic results of the robotic survey of Pit 9 at INEL

    International Nuclear Information System (INIS)

    Clegg, B.; Rowland, M.; Pence, J.

    1991-09-01

    The Buried Waste Robotics Program demonstrated and evaluated robotic techniques to non-invasively characterize a representative radiological burial area at the Idaho National Engineering Laboratory (ML). Lawrence Livermore National Laboratory (LLNL) contributed a large, NaI gamma-ray detector system and a photo-ionization organics detector to this program. This Program mounted multiple geophysics, nucleonic, and chemical sensor systems on the Solder Robot Interface Program (SRIP) remotely operated vehicle. These sensors simultaneously collected radiological waste-site, surface characterization data on Pit 9 radiological burial area, and the Cold Test Pit (CTP), off-site control area. LLNL sensors found no radiological waste at the CTP control area, however, we easily detected the natural thorium series, the potassium radionuclides and trace worldwide fallout cesium. Earlier manual measurements indicated no significant data error invoked by the vehicle on our gamma-ray and organic sensor systems. Thick soil overburden at the Subsurface Disposal Area (SDA), Pit 9, permitted radiological, but no isotopic determinations. A flood of scattered photons from the buried waste allows a surface, spatial radiological dose assessment. We found no evidence of surface-evolving organics, sensitive to photo-ionization detection. The observed signals can safely guide a remediation excavation. The vehicle-supported multiple measurements enhanced the data collection efficiency. Data provided site-surface characterization, quickly and safely in potentially hazardous areas. However, a large, buried-waste site will require subsurface access for detailed characterization

  15. Environmental site characterization and remediation at Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    Lamarre, A.L.; Ferry, R.A.

    1992-04-01

    Lawrence Livermore National Laboratory (LLNL) is a research and development laboratory owned by the US Department of Energy (DOE) and operated by the University of California. The Laboratory operates its Site 300 test facility in support of DOE's national defense programs. In support of activities, at the 300 Site numerous industrial fluids are used and various process or rinse waters and solid wastes are produced. Some of these materials are hazardous by current standards. HE rinse waters were previously discharged to inlined lagoons; they now are discharged to a permitted Class II surface impoundment Solid wastes have been deposited in nine landfills. Waste HE compounds are destroyed by open burning at a burn pit facility. As a result of these practices, environmental contaminants have been released to the soil and ground water

  16. Effect of an Antibacterial Monomer on the Antibacterial Activity of a Pit-and-Fissure Sealant.

    Directory of Open Access Journals (Sweden)

    Fan Yu

    Full Text Available Resin-based pit-and-fissure sealants are often used to form a barrier on the occlusal surface of molars to treat caries lesions; however, bacteria can remain in the pit and fissures without detection, increasing the risk of secondary caries. Sealants with antimicrobial properties or microbial repellent actions might be advantageous. The aim of this study was to assess the inhibitory effect of a 2-methacryloxylethyl dodecyl methyl ammonium bromide (MAE-DB-incorporated sealant against Streptococcus mutans. MAE-DB (4% wt was incorporated into a commercially available sealant, Eco-S resin-based pit-and-fissure sealant (Vericom Co., Ltd., Korea; a sealant without MAE-DB served as a negative control, and Clinpro™ Sealant (3M™ ESPE™, a fluoride-releasing resin, was used as a commercial control. The effects of the cured sealants and their eluents on the growth of S. mutans were determined according to colony-forming unit counts and metabolic tests. The effects of the cured sealants on the adherence and membrane integrity of S. mutans were investigated using confocal laser-scanning microscopy (CLSM in conjunction with fluorescent indicators. Compared with the negative control and commercial control, the cured MAE-DB-incorporated pit-and-fissure sealant exhibited a significant inhibitory effect on the growth of S. mutans (P < 0.05, whereas the eluents did not show any detectable antibacterial activity. The commercial control also showed no detectable bactericidal activity. Moreover, the aged experimental material retained its property of contact inhibition of biofilm formation. The fluorescence analysis of CLSM images demonstrated that the cured MAE-DB-incorporated sealant could hamper the adherence of S. mutans and exert a detrimental effect on bacterial membrane integrity. The incorporation of MAE-DB can render a pit-and-fissure sealant with contact antibacterial activity after polymerization via influencing the growth, adherence, and membrane

  17. Markov chain modelling of pitting corrosion in underground pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Caleyo, F. [Departamento de Ingenieri' a Metalurgica, ESIQIE, IPN, UPALM Edif. 7, Zacatenco, Mexico D. F. 07738 (Mexico)], E-mail: fcaleyo@gmail.com; Velazquez, J.C. [Departamento de Ingenieri' a Metalurgica, ESIQIE, IPN, UPALM Edif. 7, Zacatenco, Mexico D. F. 07738 (Mexico); Valor, A. [Facultad de Fisica, Universidad de La Habana, San Lazaro y L, Vedado, 10400 La Habana (Cuba); Hallen, J.M. [Departamento de Ingenieri' a Metalurgica, ESIQIE, IPN, UPALM Edif. 7, Zacatenco, Mexico D. F. 07738 (Mexico)

    2009-09-15

    A continuous-time, non-homogenous linear growth (pure birth) Markov process has been used to model external pitting corrosion in underground pipelines. The closed form solution of Kolmogorov's forward equations for this type of Markov process is used to describe the transition probability function in a discrete pit depth space. The identification of the transition probability function can be achieved by correlating the stochastic pit depth mean with the deterministic mean obtained experimentally. Monte-Carlo simulations previously reported have been used to predict the time evolution of the mean value of the pit depth distribution for different soil textural classes. The simulated distributions have been used to create an empirical Markov chain-based stochastic model for predicting the evolution of pitting corrosion depth and rate distributions from the observed properties of the soil. The proposed model has also been applied to pitting corrosion data from pipeline repeated in-line inspections and laboratory immersion experiments.

  18. Markov chain modelling of pitting corrosion in underground pipelines

    International Nuclear Information System (INIS)

    Caleyo, F.; Velazquez, J.C.; Valor, A.; Hallen, J.M.

    2009-01-01

    A continuous-time, non-homogenous linear growth (pure birth) Markov process has been used to model external pitting corrosion in underground pipelines. The closed form solution of Kolmogorov's forward equations for this type of Markov process is used to describe the transition probability function in a discrete pit depth space. The identification of the transition probability function can be achieved by correlating the stochastic pit depth mean with the deterministic mean obtained experimentally. Monte-Carlo simulations previously reported have been used to predict the time evolution of the mean value of the pit depth distribution for different soil textural classes. The simulated distributions have been used to create an empirical Markov chain-based stochastic model for predicting the evolution of pitting corrosion depth and rate distributions from the observed properties of the soil. The proposed model has also been applied to pitting corrosion data from pipeline repeated in-line inspections and laboratory immersion experiments.

  19. Assessment and remediation of earthen pits in Alberta

    International Nuclear Information System (INIS)

    Lye, D.E.; Deibert, L.

    1999-01-01

    The proper decommissioning of abandoned earthen pits and the elimination of the associated environmental liabilities were discussed. An earthen pit is an excavated pit used by upstream oil and gas companies to contain/store/burn produced fluids and gases from either gas or oil producing operations. Produced fluids may include liquid hydrocarbons, process chemicals and water originating from oil wells, gas wells, and associated batteries and processing facilities. Improper operation and management at some pits has resulted in soil and/or groundwater contamination. In response to regulatory direction, petroleum operators in Alberta have begun the process of replacing earthen pits with alternative flaring and liquid storage facilities, and embarked on programs to assess, remediate and decommission earthen pits at their operations. This paper describes some of the challenges facing petroleum operators in this regard. It also outlines the regulatory framework within which decommissioning projects must be completed. 2 tabs

  20. Initial geochemical characteristics of fluid fine tailings in an oil sands end pit lake

    Energy Technology Data Exchange (ETDEWEB)

    Dompierre, Kathryn A. [Department of Civil and Geological Engineering, University of Saskatchewan, Saskatoon, Saskatchewan, Canada S7N 5A9 (Canada); Lindsay, Matthew B.J., E-mail: matt.lindsay@usask.ca [Department of Geological Sciences, University of Saskatchewan, Saskatoon, Saskatchewan S7N 5E2 (Canada); Cruz-Hernández, Pablo [Department of Geology, University of Huelva, Campus ‘El Carmen’, E-21071 Huelva (Spain); Halferdahl, Geoffrey M. [Environmental Research and Development, Syncrude Canada Limited, Edmonton, Alberta T6N 1H4 (Canada)

    2016-06-15

    Geochemical characteristics of fluid fine tailings (FFT) were examined in Base Mine Lake (BML), which is the first full-scale demonstration oil sands end pit lake (EPL) in northern Alberta, Canada. Approximately 186 Mm{sup 3} of FFT was deposited between 1994 and 2012, before BML was established on December 31, 2012. Bulk FFT samples (n = 588) were collected in July and August 2013 at various depths at 15 sampling sites. Temperature, solid content, electrical conductivity (EC), pH, Eh and alkalinity were measured for all samples. Detailed geochemical analyses were performed on a subset of samples (n = 284). Pore-water pH decreased with depth by approximately 0.5 within the upper 10 m of the FFT. Major pore-water constituents included Na (880 ± 96 mg L{sup −1}) and Cl (560 ± 95 mg L{sup −1}); Ca (19 ± 4.1 mg L{sup −1}), Mg (11 ± 2.0 mg L{sup −1}), K (16 ± 2.3 mg L{sup −1}) and NH{sub 3} (9.9 ± 4.7 mg L{sup −1}) were consistently observed. Iron and Mn concentrations were low within FFT pore water, whereas SO{sub 4} concentrations decreased sharply across the FFT–water interface. Geochemical modeling indicated that FeS{sub (s)} precipitation was favoured under SO{sub 4}-reducing conditions. Pore water was also under-saturated with respect to gypsum [CaSO{sub 4}·2H{sub 2}O], and near saturation with respect to calcite [CaCO{sub 3}], dolomite [CaMg(CO{sub 3}){sub 2}] and siderite [FeCO{sub 3}]. X-ray diffraction (XRD) suggested that carbonate-mineral dissolution largely depleted calcite and dolomite. X-ray absorption near edge structure (XANES) spectroscopy revealed the presence of FeS{sub (s)}, pyrite [FeS{sub 2}], and siderite. Carbonate-mineral dissolution and secondary mineral precipitation have likely contributed to FFT dewatering and settlement. However, the long-term importance of these processes within EPLs remains unknown. These results provide a reference for assessing the long-term geochemical evolution of oil sands EPLs, and offer

  1. Association of Remitting Seronegative Symmetrical Synovitis with Pitting Edema, Polymyalgia Rheumatica, and Adenocarcinoma of the Prostate

    DEFF Research Database (Denmark)

    Emamifar, Amir; Hess, Soeren; Gildberg-Mortensen, Rannveig

    2016-01-01

    BACKGROUND Remitting seronegative symmetrical synovitis with pitting edema (RS3PE) is a rare condition that occurs in elderly individuals. It can present alone or in association with various rheumatic or malignant diseases. CASE REPORT An 83-year-old man presented with anemia, hyper......-sedimentation, and pitting edema of the back of the hands. The patient complained of pain and stiffness of the shoulder and hip girdles, especially in the morning. He was previously diagnosed with adenocarcinoma of the prostate. After 3 years of watchful waiting, treatment with goserelin, a gonadotropin releasing hormone...... of our knowledge, this is the first report of a case of RS3PE that presented twice with 2 different diagnoses in the same patient....

  2. Resuspension of polychlorinated biphenyl-contaminated field sediment: release to the water column and determination of site-specific K DOC.

    Science.gov (United States)

    Friedman, Carey L; Lohmann, Rainer; Burgess, Robert M; Perron, Monique M; Cantwell, Mark G

    2011-02-01

    Sediments from the New Bedford Harbor (NBH) U.S. Environmental Protection Agency (U.S. EPA) Superfund site (Massachusetts, USA), contaminated with polychlorinated biphenyls (PCBs), were resuspended under different water column redox conditions: untreated, oxidative, and reductive. The partitioning of PCBs to the overlying water column was measured with polyethylene samplers and compared to partitioning without resuspension. Greater concentrations of total aqueous (freely dissolved + dissolved organic carbon (DOC)-associated) PCBs were found in all resuspended treatments for PCBs with mid-range K(OW)s, but no difference was observed in total aqueous concentrations among different redox conditions. The magnitude of increased concentrations depended on resuspension time and congener K(OW), but ranged from approximately one to eight times those found without resuspension. In a parallel study, DOC was flocculated and removed from smaller-scale NBH sediment resuspensions. In situ K(DOC)s were determined and used to calculate freely dissolved and DOC-associated fractions of the increase in total aqueous PCB concentrations due to resuspension. The importance of DOC-associated PCBs increased with increasing K(OW). In situ K(DOC)s were approximately one to two orders of magnitude greater than those calculated with a commonly used linear free energy relationship (LFER). The present study demonstrates that resuspension of contaminated sediments releases PCBs to the water column, of which a significant fraction are DOC-associated (e.g., 28, 65, and 90% for PCBs 28, 66, and 110, respectively). Results also imply that site-specific PCB K(DOC)s are superior to those calculated with generic LFERs. © 2010 SETAC.

  3. Use of abandoned coal/lignite open pits for waste disposal in selected European countries

    International Nuclear Information System (INIS)

    Libicki, J.S.

    1989-01-01

    The use of abandoned coal/lignite pits as disposal sites for solid waste appears to be a reasonable approach to a difficult problem, especially if they are located close to the waste source. However, a potential for groundwater and soil pollution exists. This issue was discussed by a Group of Experts on Opencast Mining of the UN Economic Commission for Europe because most of the sites are operated by mining companies. This paper contains the major topics of discussion including the significance of the problem, legal aspects, characteristics of the open pits, waste intended for disposal, investigations required to obtain a disposal permit, disposal techniques, protection measures, monitoring environmental impacts, and research trends. A few countries are used as examples

  4. Millennium Open Pit Mine, Alberta, Canada

    Science.gov (United States)

    2007-01-01

    Near Fort McMurray, Alberta, Canada, on the east bank of the Athabasca River, are found the Steepbank and Millennium mines. These open pit mines produce oil sands that are processed to recover bitumen, and then upgrade it to refinery-ready raw crude oil, and diesel fuel. The ASTER images were acquired September 22, 2000 and July 31, 2007, cover an area of 22.5 x 25.5 km, and are located near 57 degrees north latitude, 111.5 degrees west longitude. The U.S. science team is located at NASA's Jet Propulsion Laboratory, Pasadena, Calif. The Terra mission is part of NASA's Science Mission Directorate.

  5. Markov Chain Models for the Stochastic Modeling of Pitting Corrosion

    OpenAIRE

    Valor, A.; Caleyo, F.; Alfonso, L.; Velázquez, J. C.; Hallen, J. M.

    2013-01-01

    The stochastic nature of pitting corrosion of metallic structures has been widely recognized. It is assumed that this kind of deterioration retains no memory of the past, so only the current state of the damage influences its future development. This characteristic allows pitting corrosion to be categorized as a Markov process. In this paper, two different models of pitting corrosion, developed using Markov chains, are presented. Firstly, a continuous-time, nonhomogeneous linear growth (pure ...

  6. Depth preference in released juvenile turbot Psetta maxima

    DEFF Research Database (Denmark)

    Albertsen, Christoffer Moesgaard; Støttrup, Josianne; Nielsen, Anders

    2014-01-01

    Hatchery-reared juvenile turbot Psetta maxima were tagged with Passive Integrated Transponder (PIT) tags and released at three different depths in a sandy bay in Denmark. About 2–7% of the released fish were registered daily to monitor their distribution using a tag antenna mounted on a modified...

  7. S-Mercuration of rat sorbitol dehydrogenase by methylmercury causes its aggregation and the release of the zinc ion from the active site.

    Science.gov (United States)

    Kanda, Hironori; Toyama, Takashi; Shinohara-Kanda, Azusa; Iwamatsu, Akihiro; Shinkai, Yasuhiro; Kaji, Toshiyuki; Kikushima, Makoto; Kumagai, Yoshito

    2012-11-01

    We previously developed a screening method to identify proteins that undergo aggregation through S-mercuration by methylmercury (MeHg) and found that rat arginase I is a target protein for MeHg (Kanda et al. in Arch Toxicol 82:803-808, 2008). In the present study, we characterized another S-mercurated protein from a rat hepatic preparation that has a subunit mass of 42 kDa, thereby facilitating its aggregation. Two-dimensional SDS-polyacrylamide gel electrophoresis and subsequent peptide mass fingerprinting using matrix-assisted laser desorption and ionization time-of-flight mass spectrometry revealed that the 42 kDa protein was NAD-dependent sorbitol dehydrogenase (SDH). With recombinant rat SDH, we found that MeHg is covalently bound to SDH through Cys44, Cys119, Cys129 and Cys164, resulting in the inhibition of its catalytic activity, release of zinc ions and facilitates protein aggregation. Mutation analysis indicated that Cys44, which ligates the active site zinc atom, and Cys129 play a crucial role in the MeHg-mediated aggregation of SDH. Pretreatment with the cofactor NAD, but not NADP or FAD, markedly prevented aggregation of SDH. Such a protective effect of NAD on the aggregation of SDH caused by MeHg is discussed.

  8. In situ vitrification demonstration at Pit 1, Oak Ridge National Laboratory. Volume 1: Results of treatability study

    International Nuclear Information System (INIS)

    Spalding, B.P.; Naney, M.T.; Cline, S.R.; Bogle, M.A.

    1997-12-01

    A treatability study was initiated in October 1993 to apply in situ vitrification (ISV) to at least two segments of Oak Ridge National Laboratory (ORNL) seepage Pit 1 by the end of fiscal year (FY) 1995. This treatability study was later extended to include all of Pit 1 and was performed to support a possible Interim Record of Decision or removal action for closure of one or more of the seepage pits and trenches beginning as early as FY 1997. This treatability study was carried out to establish the field-scale technical performance of ISV for (1) attaining the required depth, nominally 15 ft, to incorporate source contamination within and beneath the pits; (2) demonstrating field capability for the overlap of melt settings which will be necessary to achieve fused, melted segments of the source contamination; (3) demonstrating off-gas handling technology for accommodating and minimizing the volatilization of 137 Cs; (4) demonstrating adequate site characterization techniques to predict ISV melting kinetics, processing temperatures, and product durability; and (5) promoting public acceptance of ISV technology by demonstrating its safety, implementability, site impacts, and air emissions and by coordinating the treatability study within the regulatory closure process. In April 1996 an expulsion of an estimated 10% of the 196 Mg (216 tons) melt body occurred resulting in significant damage to ISV equipment and, ultimately, led to an indefinite suspension of further ISV operations at Pit 1. This report summarizes the technical accomplishments and status of the project in fulfilling these objectives through September 1997

  9. In situ vitrification demonstration at Pit 1, Oak Ridge National Laboratory. Volume 1: Results of treatability study

    Energy Technology Data Exchange (ETDEWEB)

    Spalding, B.P.; Naney, M.T.; Cline, S.R.; Bogle, M.A. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.; Tixier, J.S. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-12-01

    A treatability study was initiated in October 1993 to apply in situ vitrification (ISV) to at least two segments of Oak Ridge National Laboratory (ORNL) seepage Pit 1 by the end of fiscal year (FY) 1995. This treatability study was later extended to include all of Pit 1 and was performed to support a possible Interim Record of Decision or removal action for closure of one or more of the seepage pits and trenches beginning as early as FY 1997. This treatability study was carried out to establish the field-scale technical performance of ISV for (1) attaining the required depth, nominally 15 ft, to incorporate source contamination within and beneath the pits; (2) demonstrating field capability for the overlap of melt settings which will be necessary to achieve fused, melted segments of the source contamination; (3) demonstrating off-gas handling technology for accommodating and minimizing the volatilization of {sup 137}Cs; (4) demonstrating adequate site characterization techniques to predict ISV melting kinetics, processing temperatures, and product durability; and (5) promoting public acceptance of ISV technology by demonstrating its safety, implementability, site impacts, and air emissions and by coordinating the treatability study within the regulatory closure process. In April 1996 an expulsion of an estimated 10% of the 196 Mg (216 tons) melt body occurred resulting in significant damage to ISV equipment and, ultimately, led to an indefinite suspension of further ISV operations at Pit 1. This report summarizes the technical accomplishments and status of the project in fulfilling these objectives through September 1997.

  10. Research process of nondestructive testing pitting corrosion in metal material

    Directory of Open Access Journals (Sweden)

    Bo ZHANG

    2017-12-01

    Full Text Available Pitting corrosion directly affects the usability and service life of metal material, so the effective nondestructive testing and evaluation on pitting corrosion is of great significance for fatigue life prediction because of data supporting. The features of pitting corrosion are elaborated, and the relation between the pitting corrosion parameters and fatigue performance is pointed out. Through introducing the fundamental principles of pitting corrosion including mainly magnetic flux leakage inspection, pulsed eddy current and guided waves, the research status of nondestructive testing technology for pitting corrosion is summarized, and the key steps of nondestructive testing technologies are compared and analyzed from the theoretical model, signal processing to industrial applications. Based on the analysis of the signal processing specificity of different nondestructive testing technologies in detecting pitting corrosion, the visualization combined with image processing and signal analysis are indicated as the critical problems of accurate extraction of pitting defect information and quantitative characterization for pitting corrosion. The study on non-contact nondestructive testing technologies is important for improving the detection precision and its application in industries.

  11. Crack Initiation and Growth Behavior at Corrosion Pit in 2024-T3 Aluminum Alloy

    Science.gov (United States)

    2014-09-01

    concepts of fracture mechanics. Corrosion crack initiation or growth can develop when exposed to continuous or intermittent humid environment during...act as nucleation sites. For many materials of the structure such as Al, steel the growth of fatigue cracks from corrosion pit stands legitimate...critical or rather threshold values below which the nucleation of fatigue crack is not possible [6]. Under certain conditions that prevail on

  12. NESHAP Dose-Release Factor Isopleths for Five Source-to-Receptor Distances from the Center of Site and H-Area for all Compass Sectors at SRS using CAP88-PC Version 4.0

    Energy Technology Data Exchange (ETDEWEB)

    Trimor, P. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-08-09

    The Environmental Protection Agency (EPA) requires the use of the computer model CAP88-PC to estimate the total effective doses (TED) for demonstrating compliance with 40 CFR 61, Subpart H (EPA 2006), the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations. As such, CAP88 Version 4.0 was used to calculate the receptor dose due to routine atmospheric releases at the Savannah River Site (SRS). For estimation, NESHAP dose-release factors (DRFs) have been supplied to Environmental Compliance and Area Closure Projects (EC&ACP) for many years. DRFs represent the dose to a maximum receptor exposed to 1 Ci of a specified radionuclide being released into the atmosphere. They are periodically updated to include changes in the CAP88 version, input parameter values, site meteorology, and location of the maximally exposed individual (MEI). This report presents the DRFs of tritium oxide released at two onsite locations, center-of-site (COS) and H-Area, at 0 ft. elevation to maximally exposed individuals (MEIs) located 1000, 3000, 6000, 9000, and 12000 meters from the release areas for 16 compass sectors. The analysis makes use of area-specific meteorological data (Viner 2014).

  13. Engineered covers for mud pit closures Central Nevada Test Area, Nevada

    International Nuclear Information System (INIS)

    Madsen, D.D.

    2000-01-01

    Two abandoned drilling mud pits impacted with petroleum hydrocarbons were determined to require closure action at the Central Nevada Test Area. The UC-4 Mud Pit C is approximately 0.12 hectares (0.3 acres) and 1.2 meters (4 feet) in depth. The UC-1 Central Mud Pit (CMP) is approximately 1.54 hectares (3.8 acres) and 2.4 meters (8 feet) in depth. Both mud pits contain bentonite drilling muds with a thin dry crust, low shear strength, low permeability, and high moisture content. The following closure methodologies were evaluated: stabilization by mixing/injection with soil, fly ash, and lime; excavation and disposal; on-site drying; thermal destruction; wick drains; administrative closure (postings and land-use restrictions); and engineered covers. Based upon regulatory closure criteria, implementation, and cost considerations, the selected remedial alternative was the construction of an engineered cover. A multilayered cover with a geo-grid and geo-synthetic clay liner (GCL) was designed and constructed over the UC-4 Mud Pit C to evaluate the constructability and applicability of the design for the CMP cover. The geo-grid provided structural strength for equipment and material loads during cover construction, and the GCL was used as a moisture infiltration barrier. The design was determined to be constructable and applicable. To reduce project costs for the CMP cover, a vegetative cover was designed with drainage toward the center of the cover rather than the perimeter. The vegetative cover with the internal drainage design resulted in a fill volume reduction of approximately 63 percent compared to the multilayered cover design with a GCL

  14. Analysis of disposal of uranium mill tailings in a mined out open pit

    International Nuclear Information System (INIS)

    Staub, W.P.; Triegel, E.K.

    1978-08-01

    Mined out open pits are presently under consideration as disposal sites for uranium mill tailings. In this method of tailings management, the escape of contaminated liquid into an adjacent aquifer is the principal environmental concern. The modified Bishop Method was used to analyze the structural stability of a clay liner along the highwall and fluid flow models were used to analyze the effect of tailings solutions on groundwater under several operating conditions. The slope stability of a clay liner was analyzed at three stages of operation: (1) near the beginning of construction, (2) when the pit is partially filled with tailings, and (3) at the end of construction. Both clay lined and unlined pits were considered in the fluid flow modeling. Finally, the seepage of tailings solutions through the clay liner was analyzed. Results of the slope stability analysis showed that it would be necessary to construct the clay liner as a modified form of engineered embankment. This embankment would be similar in construction to that of an earthfill dam. It could be constructed on a 1 : 1 slope provided the tailings slurry were managed properly. It would be necessary to maintain the freeboard height between the embankment and tailings at less than 4 m. A partially dewatered sand beach would have to be located adjacent to the embankment. Potential leakage and aquifer contamination was modeled for lined and unlined pits of various designs. Sulfate, and possibly U and Th, are the most likely contaminants. Results from the model showed the clay and soil cement lined pit to be most effective in containing the pollutants

  15. Acid Pit Stabilization Project (Volume 1 - Cold Testing) and (Volume 2 - Hot Testing)

    International Nuclear Information System (INIS)

    Loomis, G. G.; Zdinak, A. P.; Ewanic, M. A.; Jessmore, J. J.

    1998-01-01

    During the summer and fall of Fiscal Year 1997, a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Treatability Study was performed at the Idaho National Engineering and Environmental Laboratory. The study involved subsurface stabilization of a mixed waste contaminated soil site called the Acid Pit. This study represents the culmination of a successful technology development effort that spanned Fiscal Years 1994-1996. Research and development of the in situ grout stabilization technique was conducted. Hardware and implementation techniques are currently documented in a patent pending with the United States Patent and Trademark Office. The stabilization technique involved using jet grouting of an innovative grouting material to form a monolith out of the contamination zone. The monolith simultaneously provides a barrier to further contaminant migration and closes voids in the soil structure against further subsidence. This is accomplished by chemical incorporation of contaminants into less soluble species and achieving a general reduction in hydraulic conductivity within the monolith. The grout used for this study was TECT-HG, a relatively dense iron oxide-based cementitious grout. The treatability study involved cold testing followed by in situ stabilization of the Acid Pit. Volume 1 of this report discusses cold testing, performed as part of a ''Management Readiness Assessment'' in preparation for going hot. Volume 2 discusses the results of the hot Acid Pit Stabilization phase of this project. Drilling equipment was specifically rigged to reduce the spread of contamination, and all grouting was performed under a concrete block containing void space to absorb any grout returns. Data evaluation included examination of implementability of the grouting process and an evaluation of the contaminant spread during grouting. Following curing of the stabilized pit, cores were obtained and evaluated for toxicity characteristic leach ing

  16. Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit (631-18G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-07-01

    This Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit is issued by the U.S. Department of Energy, the lead agency for the Savannah River Site remedial activities, with concurrence by the U.S. Environmental Protection Agency - Region IV, and the South Carolina Department of Health and Environmental Control

  17. Phase II, Title I, engineering assessment of inactive uranium mill tailings, Riverton Site, Riverton, Wyoming

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Spook Site, Converse County, Wyoming. Services include the performance of core drillings, soil, water and other sample analyses, radiometric measurements to determine areas with radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site geology, hydrology, and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 187,000 tons of tailings at the Spook Site constitutes the main environmental impact, which is negligible. The two alternative actions presented are better fencing of the site in its present state, and placing tailings and contaminated on-site materials and soil in the open-pit mine and covering the resulting pile with 2 ft of overburden materials. The cost estimates for the options are $81,000 and $142,000, respectively

  18. Salmon Site Remedial Investigation Report, Appendix D

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  19. Salmon Site Remediation Investigation Report, Appendix A

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  20. Salmon Site Remedial Investigation Report, Appendix C

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  1. Salmon Site Remedial Investigation Report, Exhibit 2

    Energy Technology Data Exchange (ETDEWEB)

    USDOE NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  2. Salmon Site Remedial Investigation Report, Exhibit 5

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  3. Salmon Site Remedial Investigation Report, Appendix C

    Energy Technology Data Exchange (ETDEWEB)

    US DOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  4. Salmon Site Remedial Investigation Report, Exhibit 2

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  5. Salmon Site Remedial Investigation Report, Main Body

    Energy Technology Data Exchange (ETDEWEB)

    US DOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  6. Salmon Site Remedial Investigation Report, Exhibit 5

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  7. Numerical modelling of the groundwater inflow to an advancing open pit mine: Kolahdarvazeh pit, Central Iran.

    Science.gov (United States)

    Bahrami, Saeed; Doulati Ardejani, Faramarz; Aslani, Soheyla; Baafi, Ernest

    2014-12-01

    The groundwater inflow into a mine during its life and after ceasing operations is one of the most important concerns of the mining industry. This paper presents a hydrogeological assessment of the Irankuh Zn-Pb mine at 20 km south of Esfahan and 1 km northeast of Abnil in west-Central Iran. During mine excavation, the upper impervious bed of a confined aquifer was broken and water at high-pressure flowed into an open pit mine associated with the Kolahdarvazeh deposit. The inflow rates were 6.7 and 1.4 m(3)/s at the maximum and minimum quantities, respectively. Permeability, storage coefficient, thickness and initial head of the fully saturated confined aquifer were 3.5 × 10(-4) m/s, 0.2, 30 m and 60 m, respectively. The hydraulic heads as a function of time were monitored at four observation wells in the vicinity of the pit over 19 weeks and at an observation well near a test well over 21 h. In addition, by measuring the rate of pumping out from the pit sump, at a constant head (usually equal to height of the pit floor), the real inflow rates to the pit were monitored. The main innovations of this work were to make comparison between numerical modelling using a finite element software called SEEP/W and actual data related to inflow and extend the applicability of the numerical model. This model was further used to estimate the hydraulic heads at the observation wells around the pit over 19 weeks during mining operations. Data from a pump-out test and observation wells were used for model calibration and verification. In order to evaluate the model efficiency, the modelling results of inflow quantity and hydraulic heads were compared to those from analytical solutions, as well as the field data. The mean percent error in relation to field data for the inflow quantity was 0.108. It varied between 1.16 and 1.46 for hydraulic head predictions, which are much lower values than the mean percent errors resulted from the analytical solutions (from 1.8 to 5

  8. EARTHSAWtm IN-SITU CONTAINMENT OF PITS AND TRENCHES

    International Nuclear Information System (INIS)

    Ernest E. Carter, P.E.

    2002-01-01

    EarthSaw(trademark) is a proposed technology for construction of uniform high quality barriers under and around pits and trenches containing buried radioactive waste without excavating or disturbing the waste. The method works by digging a deep vertical trench around the perimeter of a site, filling that trench with high specific gravity grout sealant, and then cutting a horizontal bottom pathway at the base of the trench with a simple cable saw mechanism. The severed block of earth becomes buoyant in the grout and floats on a thick layer of grout, which then cures into an impermeable barrier. The ''Interim Report on task 1 and 2'' which is incorporated into this report as appendix A, provided theoretical derivations, field validation of formulas, a detailed quantitative engineering description of the technique, engineering drawings of the hardware, and a computer model of how the process would perform in a wide variety of soil conditions common to DOE waste burial sites. The accomplishments of task 1 and 2 are also summarized herein Task 3 work product provides a comprehensive field test plan in Appendix B and a health and safety plan in Appendix C and proposal for a field-scale demonstration of the EarthSaw barrier technology. The final report on the subcontracted stress analysis is provided in Appendix D. A copy of the unified computer model is provided as individual non-functional images of each sheet of the spreadsheet and separately as a Microsoft Excel 2000 file

  9. Flare pits wastes remediation by low temperature oxidation

    International Nuclear Information System (INIS)

    Catalan, L. J. L.; Jamaluddin, A. K. M.; Mehta, R.; Moore, R. G.; Okazawa, N.; Ursenbach, M.

    1997-01-01

    The remediation of contaminated soil in oilfield sites, flare pits in particular, is subject to strict environmental regulations. Most current remediation techniques such as biological or thermal treatment are not particularly effective in highly contaminated sites, or effective only at costs that are considered prohibitive. This contribution describes a cost-effective method for the treatment of contaminated soil in-situ. The proposed treatment involves low temperature oxidation which converts the hydrocarbons in the contaminated soil to inert coke. In laboratory studies contaminated soil was oxidized with air at temperatures between 150 degrees C and 170 degrees C for three weeks. After the three week treatment extractable hydrocarbon levels were reduced to less than 0.1 per cent. Bioassays also demonstrated that toxicity associated with hydrocarbons was eliminated. Salts and metals remaining in the soil after treatment were removed by leaching with water. Low temperature oxidation requires no special equipment; it can occur under conditions and with equipment that are readily available in an oilfield setting. 5 refs., 8 tabs., 7 figs

  10. EARTHSAWtm IN-SITU CONTAINMENT OF PITS AND TRENCHES

    Energy Technology Data Exchange (ETDEWEB)

    Ernest E. Carter, P.E.

    2002-09-20

    EarthSaw{trademark} is a proposed technology for construction of uniform high quality barriers under and around pits and trenches containing buried radioactive waste without excavating or disturbing the waste. The method works by digging a deep vertical trench around the perimeter of a site, filling that trench with high specific gravity grout sealant, and then cutting a horizontal bottom pathway at the base of the trench with a simple cable saw mechanism. The severed block of earth becomes buoyant in the grout and floats on a thick layer of grout, which then cures into an impermeable barrier. The ''Interim Report on task 1 and 2'' which is incorporated into this report as appendix A, provided theoretical derivations, field validation of formulas, a detailed quantitative engineering description of the technique, engineering drawings of the hardware, and a computer model of how the process would perform in a wide variety of soil conditions common to DOE waste burial sites. The accomplishments of task 1 and 2 are also summarized herein Task 3 work product provides a comprehensive field test plan in Appendix B and a health and safety plan in Appendix C and proposal for a field-scale demonstration of the EarthSaw barrier technology. The final report on the subcontracted stress analysis is provided in Appendix D. A copy of the unified computer model is provided as individual non-functional images of each sheet of the spreadsheet and separately as a Microsoft Excel 2000 file.

  11. Analysis of two Pit-1 gene polymorphisms: Single nucleotide ...

    African Journals Online (AJOL)

    Pit-1 is a pituitary-specific transcription factor responsible for pituitary development and hormone expression in mammals. Pit-1 is a member of the POU domain containing proteins, a group of transcriptional regulators with a critical role in cell differentiation and proliferation. It was shown that this group of proteins control the ...

  12. The phylogenetic significance of vestured pits in Boraginaceae

    NARCIS (Netherlands)

    Rabaey, D.; Lens, F.; Smets, E.; Jansen, S.

    2010-01-01

    The bordered pit structure in tracheary elements of 105 Boraginaceae species is studied using scanning electron microscopy to examine the systematic distribution of vestured pits. Forty-three species out of 16 genera show a uniform presence of this feature throughout their secondary xylem. Most

  13. Modelling the filling rate of pit latrines | Brouckaert | Water SA

    African Journals Online (AJOL)

    Excreta (faeces and urine) that are deposited into a pit latrine are subject to biodegradation, which substantially reduces the volume that remains. On the other hand, other matter that is not biodegradable usually finds itsway into pit latrines. The net filling rate is thus dependent on both the rate of addition of material and its ...

  14. Pit membranes of Ephedra resemble gymnosperms more than angiosperms

    Science.gov (United States)

    Roland Dute; Lauren Bowen; Sarah Schier; Alexa Vevon; Troy Best; Maria Auad; Thomas Elder; Pauline Bouche; Steven Jansen

    2014-01-01

    Bordered pit pairs of Ephedra species were characterized using different types of microscopy. Pit membranes contained tori that did not stain for lignin. SEM and AFM views of the torus surface showed no plasmodesmatal openings, but branched, secondary plasmodesmata were occasionally noted using TEM in conjunction with ultrathin sections. The margo consisted of radial...

  15. Inhibition of Copper Pitting Corrosion in Aggressive Potable Waters

    Directory of Open Access Journals (Sweden)

    Emily Sarver

    2012-01-01

    Full Text Available Copper pitting corrosion can lead to premature plumbing failures, and can be caused by aggressive potable waters characterized by high pH, free chlorine residual and low alkalinity. In such waters and under continuous flow, certain inhibitors including phosphate, silica or natural organic matter may greatly reduce pitting occurrence. In the current work, 1 mg/L phosphate (as P completely prevented initiation of pits, and 5 mg/L silica (as Si significantly decelerated pitting. However, much lower doses of these inhibitors had little benefit and actually accelerated the rate of attack in some cases. Effects of organic matter were dependent on both the type (e.g., natural versus ozonated humic substances and dosage. Dose-response effects of free chlorine and alkalinity were also investigated. Based on electrochemical data, pits initiated more rapidly with increased free chlorine, but even moderate levels of chlorine (~0.4 mg/L eventually caused severe pitting. High alkalinity decreased pit propagation rates but did not prevent pit formation.

  16. 241-AY-102 Leak Detection Pit Drain Line Inspection Report

    International Nuclear Information System (INIS)

    Boomer, Kayle D.; Engeman, Jason K.; Gunter, Jason R.; Joslyn, Cameron C.; Vazquez, Brandon J.; Venetz, Theodore J.; Garfield, John S.

    2014-01-01

    This document provides a description of the design components, operational approach, and results from the Tank AY-102 leak detection pit drain piping visual inspection. To perform this inspection a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest Technologies, Inc. for WRPS to inspect the 6-inch leak detection pit drain line

  17. Stochastic models for predicting pitting corrosion damage of HLRW containers

    International Nuclear Information System (INIS)

    Henshall, G.A.

    1991-10-01

    Stochastic models for predicting aqueous pitting corrosion damage of high-level radioactive-waste containers are described. These models could be used to predict the time required for the first pit to penetrate a container and the increase in the number of breaches at later times, both of which would be useful in the repository system performance analysis. Monte Carlo implementations of the stochastic models are described, and predictions of induction time, survival probability and pit depth distributions are presented. These results suggest that the pit nucleation probability decreases with exposure time and that pit growth may be a stochastic process. The advantages and disadvantages of the stochastic approach, methods for modeling the effects of environment, and plans for future work are discussed

  18. PITTING CORROSION OF STAINLESS STEEL AT THE VARIOUS SURFACE TREATMENT

    Directory of Open Access Journals (Sweden)

    Viera Zatkalíková

    2011-09-01

    Full Text Available The stainless steel surface treatment is very important with regard to its pitting corrosion susceptibility. An effect of various types surfacing on pitting corrosion resistance of AISI 304stainless steel is investigated in this work. The samples of the tested material are turned, blasted, peened, grinded and a half of them are pickled to achieve higher purity of surfaces and better quality of passive film. Eight types of different finished surfaces are tested by electrochemical and immersion tests to determine corrosion behaviour in conditions where pitting is evoked by controlled potential and second by solution with high redox potential. By this way the effect of mechanical and chemical surface treatment on the resistance to pitting corrosion, character, size and shape of pits are compared in the conditions of different mechanisms of corrosion process.

  19. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.; Telleschi, P.

    1978-10-01

    Two of the main underground siting alternatives, the rock cavity plant and the pit siting, have been investigated in detail and two layouts, developed for specific sites, have been proposed. The influence of this type of siting on normal operating conditions and during abnormal occurences have been investigated. (Auth.)

  20. Optic nerve head pit-associated maculopathy

    International Nuclear Information System (INIS)

    Beltrán Sainz, Raisa Ivis; Hernández Baguer, Raisa; Gonzales Díaz, Rafael Ernesto; Hernández Martínez, Rocío; Galindo Reimond, Kenia

    2016-01-01

    A literature review was made to expand knowledge on the optic nerve head pit-related maculopathy, its physiopathology and main manifestations, clinical and angiographic diagnosis, optical coherence tomography, and to describe some of the treatments recently used worldwide. The current therapeutic tendencies were taken into account. The fundamental sources of information were scientific articles from journals in PubMED and Cochrane databases as well as basic texts which dealt with this topic in the last five years through Google search engine. Despite the rare occurrence of the disease, its management may be difficult particularly in macular effect cases. This paper confirmed that most of the studies used small samples, were retrospective, non-comparative and non-randomized. However, some therapeutic modalities were found, which have been used for years and also descriptions of new techniques that require further research. There is no consensus on the ideal treatment protocol for this disease. (author)

  1. Radio Propagation in Open-pit Mines

    DEFF Research Database (Denmark)

    Portela Lopes de Almeida, Erika; Caldwell, George; Rodriguez Larrad, Ignacio

    2017-01-01

    In this paper we present the results of an extensive measurement campaign performed at two large iron ore mining centers in Brazil at the 2.6 GHz band. Although several studies focusing on radio propagation in underground mines have been published, measurement data and careful analyses for open......-pit mines are still scarce. Our results aim at filling this gap in the literature. The research is motivated by the ongoing mine automation initiatives, where connectivity becomes critical. This paper presents the first set of results comprising measurements under a gamut of propagation conditions. A second...... paper detailing sub-GHz propagation is also in preparation. The results indicate that conventional wisdom is wrong, in other words, radio-frequency (RF) propagation in surface mines can be far more elaborate than plain free-space line-of-sight conditions. Additionally, the old mining adage “no two mines...

  2. Construction of the KUT test pits

    International Nuclear Information System (INIS)

    Knapp, K.E.; Bush, W.E.

    1976-09-01

    Models are required to calibrate spectral logging systems to differentiate between U, Th, and K (''KUT''), in order to determine the grade of low-grade U deposits. The models were constructed by excavating three pits, emplacing three form tanks (11 ft long, 4 ft dia culvert) with 4-in. dia central holes, and pouring the following zones: 3-ft concrete lower barren zone, a 5-ft ore zone, and a final 3-ft upper barren zone. The U ore zone comprised 0.33 percent U 3 O 8 Climax ore, sand, cement, and water; the Th ore zone comprised monazite sands, plaster sand, cement, and water; and the K ore zone comprised feldspar, cement, and water. Form pipes were used to form the central holes. Analyses were made of samples taken from the zones

  3. A study on the initiation of pitting corrosion in carbon steel in chloride-containing media using scanning electrochemical probes

    International Nuclear Information System (INIS)

    Lin Bin; Hu Ronggang; Ye Chenqing; Li Yan; Lin Changjian

    2010-01-01

    Scanning electrochemical probes of corrosion potential and chloride ions were developed for the in situ monitoring of localized corrosion processes of reinforcing steel in NaCl-containing solution. The results indicated that the chloride ions (Cl - ) preferentially adsorbed and accumulated at the imperfect/defective sites, resulting in initiation and propagation of pitting corrosion on the reinforcing steel surface. An electron microprobe analyzer (EMPA) was used to examine the corrosion morphology and elemental distribution at the corroded location to investigate the origins of the preferential Cl - adsorption and pitting corrosion. By combining the in situ and ex situ images, we concluded that manganese sulfide inclusions in reinforcing steel are the most susceptible defects to pitting corrosion in chloride-containing solution.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the location of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of

  5. Sellafield (release of radioactivity)

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham, J; Goodlad, A; Morris, M

    1986-02-06

    A government statement is reported, about the release of plutonium nitrate at the Sellafield site of British Nuclear Fuels plc on 5 February 1986. Matters raised included: details of accident; personnel monitoring; whether radioactive material was released from the site; need for public acceptance of BNFL activities; whether plant should be closed; need to reduce level of radioactive effluent; number of incidents at the plant.

  6. Comparative Performance of Acoustic-tagged and PIT-tagged Juvenile Salmonids

    Energy Technology Data Exchange (ETDEWEB)

    Hockersmith, Eric E.; Brown, Richard S.; Liedtke, Theresa L.

    2008-02-01

    Numerous research tools and technologies are currently being used to evaluate fish passage and survival to determine the impacts of the Federal Columbia River Power System (FCRPS) on endangered and threatened juvenile salmonids, including PIT tags, balloon tags, hydroacoustic evaluations, radio telemetry, and acoustic telemetry. Each has advantages and disadvantages, but options are restricted in some situations because of limited capabilities of a specific technology, lack of detection capability downstream, or availability of adequate numbers of fish. However, there remains concern about the comparative effects of the tag or the tagging procedure on fish performance. The recently developed Juvenile Salmonid Acoustic Telemetry System (JSATS) acoustic transmitter is the smallest active acoustic tag currently available. The goal of this study was to determine whether fish tagged with the JSATS acoustic-telemetry tag can provide unbiased estimates of passage behavior and survival within the performance life of the tag. We conducted both field and laboratory studies to assess tag effects. For the field evaluation we released a total of 996 acoustic-tagged fish in conjunction with 21,026 PIT-tagged fish into the tailrace of Lower Granite Dam on 6 and 13 May. Travel times between release and downstream dams were not significantly different for the majority of the reaches between acoustic-tagged and PIT-tagged fish. In addition to the field evaluation, a series of laboratory experiments were conducted to determine if growth and survival of juvenile Chinook salmon surgically implanted with acoustic transmitters is different than untagged or PIT tagged juvenile Chinook salmon. Only yearling fish with integrated and non-integrated transmitters experienced mortalities, and these were low (<4.5%). Mortality among sub-yearling control and PIT-tag treatments ranged up to 7.7% while integrated and non-integrated treatments had slightly higher rates (up to 8.3% and 7

  7. Newly reported lupus and rheumatoid arthritis in relation to deployment within proximity to a documented open-air burn pit in Iraq.

    Science.gov (United States)

    Jones, Kelly A; Smith, Besa; Granado, Nisara S; Boyko, Edward J; Gackstetter, Gary D; Ryan, Margaret A K; Phillips, Christopher J; Smith, Tyler C

    2012-06-01

    To assess the relationship between possible exposure to smoke from documented open-air burn pits and newly reported lupus and rheumatoid arthritis among Millennium Cohort participants who have deployed in support of operations in Iraq and Afghanistan. Prospectively assessed self-reported lupus and rheumatoid arthritis among deployers who completed both 2004-2006 and 2007-2008 questionnaires. After exclusions, more than 18,000 participants were deployed, including more than 3000 participants deployed within a 3-mile radius of a documented burn pit. After adjustment, proximity within 3 miles of a burn pit was not significantly associated with rheumatoid arthritis or lupus in general; however, one location was associated with lupus, although few cases were at this site (n = 2). Results indicate deployers potentially exposed to documented burn pits in the combined three-camp analysis were not at an elevated risk of lupus or rheumatoid arthritis.

  8. An AFM-based pit-measuring method for indirect measurements of cell-surface membrane vesicles

    International Nuclear Information System (INIS)

    Zhang, Xiaojun; Chen, Yuan; Chen, Yong

    2014-01-01

    Highlights: • Air drying induced the transformation of cell-surface membrane vesicles into pits. • An AFM-based pit-measuring method was developed to measure cell-surface vesicles. • Our method detected at least two populations of cell-surface membrane vesicles. - Abstract: Circulating membrane vesicles, which are shed from many cell types, have multiple functions and have been correlated with many diseases. Although circulating membrane vesicles have been extensively characterized, the status of cell-surface membrane vesicles prior to their release is less understood due to the lack of effective measurement methods. Recently, as a powerful, micro- or nano-scale imaging tool, atomic force microscopy (AFM) has been applied in measuring circulating membrane vesicles. However, it seems very difficult for AFM to directly image/identify and measure cell-bound membrane vesicles due to the similarity of surface morphology between membrane vesicles and cell surfaces. Therefore, until now no AFM studies on cell-surface membrane vesicles have been reported. In this study, we found that air drying can induce the transformation of most cell-surface membrane vesicles into pits that are more readily detectable by AFM. Based on this, we developed an AFM-based pit-measuring method and, for the first time, used AFM to indirectly measure cell-surface membrane vesicles on cultured endothelial cells. Using this approach, we observed and quantitatively measured at least two populations of cell-surface membrane vesicles, a nanoscale population (<500 nm in diameter peaking at ∼250 nm) and a microscale population (from 500 nm to ∼2 μm peaking at ∼0.8 μm), whereas confocal microscopy only detected the microscale population. The AFM-based pit-measuring method is potentially useful for studying cell-surface membrane vesicles and for investigating the mechanisms of membrane vesicle formation/release

  9. Pit above the lesser tuberosity in axial view radiography.

    Science.gov (United States)

    Cho, Jae-Ho; Han, Kyeong-Jin; Lee, Doo-Hyung; Chung, Nam-Su; Park, Do Young

    2015-02-01

    This study examined the relationship between the presence of a pit above the lesser tuberosity on axial view radiographs and rotator cuff tears and compared the demographic data between groups according to the presence of a pit above the lesser tuberosity. The hypothesis of this study was that the radiographic finding of a pit above the lesser tuberosity is related to rotator cuff tears. For 112 patients with a symptomatic rotator cuff tear, plain radiographs of the symptomatic shoulder (tear side radiographs) and plain radiographs of the asymptomatic contralateral shoulder (no-tear side radiographs) were assessed. Seventeen radiological findings, including a pit above the lesser tuberosity, osteophytes, subchondral cysts, and sclerosis, were recorded by one blinded observer. Demographic data such as age, duration of symptoms, sex, arm dominance, smoking history, trauma history, American Shoulder and Elbow Surgeons score, Constant score, and involved tendon were collected. A pit above the lesser tuberosity was noted on tear side radiographs of 40 patients (35.7 %) and on the no-tear side radiographs of 27 patients (24.1 %), representing a significant difference (P = 0.040). A pit associated with a rotator cuff tear was observed more often in the dominant arm (P = 0.040) and more often in patients with less previous trauma (P = 0.024). A pit above the lesser tuberosity on axial view radiography was associated with a rotator cuff tear and occurred more often in the dominant arm of patients who had no trauma history. Prognostic study, Level III.

  10. Corrosion pit depth extreme value prediction from limited inspection data

    International Nuclear Information System (INIS)

    Najjar, D.; Bigerelle, M.; Iost, A.; Bourdeau, L.; Guillou, D.

    2004-01-01

    Passive alloys like stainless steels are prone to localized corrosion in chlorides containing environments. The greater the depth of the localized corrosion phenomenon, the more dramatic the related damage that can lead to a structure weakening by fast perforation. In practical situations, because measurements are time consuming and expensive, the challenge is usually to predict the maximum pit depth that could be found in a large scale installation from the processing of a limited inspection data. As far as the parent distribution of pit depths is assumed to be of exponential type, the most successful method was found in the application of the statistical extreme-value analysis developed by Gumbel. This study aims to present a new and alternative methodology to the Gumbel approach with a view towards accurately estimating the maximum pit depth observed on a ferritic stainless steel AISI 409 subjected to an accelerated corrosion test (ECC1) used in automotive industry. This methodology consists in characterising and modelling both the morphology of pits and the statistical distribution of their depths from a limited inspection dataset. The heart of the data processing is based on the combination of two recent statistical methods that avoid making any choice about the type of the theoretical underlying parent distribution of pit depths: the Generalized Lambda Distribution (GLD) is used to model the distribution of pit depths and the Bootstrap technique to determine a confidence interval on the maximum pit depth. (authors)

  11. Pitting by corrosion in aluminium and Al-6201 alloy

    International Nuclear Information System (INIS)

    Vera, R.; Schrebler, R.; Layana, G.; Orellana, F.; Olguin, A.

    1998-01-01

    The susceptibility of pure aluminum 6201 alloy to pitting was investigated in sodium chloride solutions through determination of the corrosion, repassivation and pitting potentials. Potentiodynamic polarization including scratching techniques were employed being also determined the type and relative amount of corrosion damage to the metals. The morphology of the attach was determined using scanning electrons microscopy (SEM). The results showed a similar performance for aluminum 6201 alloy and aluminum. It was also observed that an increase in chloride concentration resulted in a decrease in the corrosion, pitting and repassivation potentials of both materials. (Author) 19 refs

  12. Investigating oiled birds from oil field waste pits

    International Nuclear Information System (INIS)

    Gregory, D.G.; Edwards, W.C.

    1991-01-01

    Procedures and results of investigations concerning the oiling of inland raptors, migratory water-fowl and other birds are presented. Freon washings from the oiled birds and oil from the pits were analyzed by gas chromatography. In most instances the source of the oil could be established by chromatographic procedures. The numbers of birds involved (including many on the endangered species list) suggested the need for netting or closing oil field waste pits and mud disposal pits. Maintaining a proper chain of custody was important

  13. A flare for decommissioning : a push to close flare pits in B.C. earns Petro-Canada an industry award for environmental stewardship

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.

    2009-01-15

    Flaring is widely used to dispose of natural gas liberated during oil production and processing in remote areas where there is no pipeline on site to make use of the gas. Sources of flaring include well testing, solution gas from oil wells, underbalanced drilling, gas gathering systems and gas processing plants. Flaring is a source of pollution and a waste of energy. This article described Petro-Canada's efforts to eliminate flaring. In the late 1990s, the company began environmental assessments of its flare pits in British Columbia (BC). Since 2005, the producer has decommissioned 106 of its 108 pits in the province and ring-fenced the other 2. As the staff advanced the task of decommissioning, it often consolidated flaring hardware, installing a single, vertical flare stack to serve where 3 or 4 flare pits had previously served as many well sites. Before decommissioning began, Petro-Canada carried out its own environmental protocol and assessed its pits for the presence of contaminants and for their potential to leach into local waterways. Monitoring of groundwater through wells drilled on the company's BC flare pit sites will continue for some time, particularly on sites with bodies of water. BC's Oil and Gas Commission estimated that between 1996 and 2006, conservation of solution gas rose from 87 to 97 per cent among the province's producers. Petro-Canada was commended for being among the first to secure all flare pits under its control in BC. It was estimated that 49 per cent of all flare pits decommission in BC by 2007 were completed by Petro-Canada. 2 refs., 2 figs.

  14. Estimated airborne release of plutonium from Atomics International's Nuclear Materials Development Facility in the Santa Susana site, California, as a result of postulated damage from severe wind and earthquake hazard

    International Nuclear Information System (INIS)

    Mishima, J.; Ayer, J.E.

    1981-09-01

    The potential mass of airborne releases of plutonium (source term) that could result from wind and seismic damage is estimated for the Atomics International Company's Nuclear Materials Development Facility (NMDF) at the Santa Susana site in California. The postulated source terms will be useful as the basis for estimating the potential dose to the maximum exposed individual by inhalation and to the total population living within a prescribed radius of the site. The respirable fraction of airborne particles is thus the principal concern. The estimated source terms are based on the damage ratio, and the potential airborne releases if all enclosures suffer particular levels of damage. In an attempt to provide a realistic range of potential source terms that include most of the normal processing conditions, a best estimate bounded by upper and lower limits is provided. The range of source terms is calculated by combining a high best estimate and a low damage ratio, based on a fraction of enclosures suffering crush or perforation, with the airborne release from enclosures based upon an upper limit, average, and lower limit inventory of dispersible materials at risk. Two throughput levels are considered. The factors used to evaluate the fractional airborne release of materials and the exchange rates between enclosed and exterior atmospheres are discussed. The postulated damage and source terms are discussed for wind and earthquake hazard scenarios in order of their increasing severity

  15. A phenomenological approach to simulating the evolution of radioactive-waste container damage due to pitting corrosion

    International Nuclear Information System (INIS)

    Henshall, G.A.

    1995-01-01

    The damage to high-level radioactive-waste containers by pitting corrosion is an important design and performance assessment consideration. It is desirable to calculate the evolution of the pit depth distribution, not just the time required for initial penetration of the containers, so that the area available for advective of diffusive release of radionuclides through the container can be estimated. A phenomenological approach for computing the time evolution of these distributions is presented which combines elements of the deterministic and stochastic aspects of pit growth. The consistency of this approach with the mechanisms believed to control the evolution of the pit depth distribution is discussed. Qualitative comparisons of preliminary model predictions with a variety of experimental data from the literature are shown to be generally favorable. The sensitivity of the simulated distributions to changes in the input parameters is discussed. Finally, the results of the current model are compared to those of existing approaches based on extreme-value statistics, particularly regarding the extrapolation of laboratory data to large exposed surface areas

  16. Somatotropinomas, but not nonfunctioning pituitary adenomas, maintain a functional apoptotic RET/Pit1/ARF/p53 pathway that is blocked by excess GDNF.

    Science.gov (United States)

    Diaz-Rodriguez, Esther; Garcia-Rendueles, Angela R; Ibáñez-Costa, Alejandro; Gutierrez-Pascual, Ester; Garcia-Lavandeira, Montserrat; Leal, Alfonso; Japon, Miguel A; Soto, Alfonso; Venegas, Eva; Tinahones, Francisco J; Garcia-Arnes, Juan A; Benito, Pedro; Angeles Galvez, Maria; Jimenez-Reina, Luis; Bernabeu, Ignacio; Dieguez, Carlos; Luque, Raul M; Castaño, Justo P; Alvarez, Clara V

    2014-11-01

    Acromegaly is caused by somatotroph cell adenomas (somatotropinomas [ACROs]), which secrete GH. Human and rodent somatotroph cells express the RET receptor. In rodents, when normal somatotrophs are deprived of the RET ligand, GDNF (Glial Cell Derived Neurotrophic Factor), RET is processed intracellularly to induce overexpression of Pit1 [Transcription factor (gene : POUF1) essential for transcription of Pituitary hormones GH, PRL and TSHb], which in turn leads to p19Arf/p53-dependent apoptosis. Our purpose was to ascertain whether human ACROs maintain the RET/Pit1/p14ARF/p53/apoptosis pathway, relative to nonfunctioning pituitary adenomas (NFPAs). Apoptosis in the absence and presence of GDNF was studied in primary cultures of 8 ACROs and 3 NFPAs. Parallel protein extracts were analyzed for expression of RET, Pit1, p19Arf, p53, and phospho-Akt. When GDNF deprived, ACRO cells, but not NFPAs, presented marked level of apoptosis that was prevented in the presence of GDNF. Apoptosis was accompanied by RET processing, Pit1 accumulation, and p14ARF and p53 induction. GDNF prevented all these effects via activation of phospho-AKT. Overexpression of human Pit1 (hPit1) directly induced p19Arf/p53 and apoptosis in a pituitary cell line. Using in silico studies, 2 CCAAT/enhancer binding protein alpha (cEBPα) consensus-binding sites were found to be 100% conserved in mouse, rat, and hPit1 promoters. Deletion of 1 cEBPα site prevented the RET-induced increase in hPit1 promoter expression. TaqMan qRT-PCR (real time RT-PCR) for RET, Pit1, Arf, TP53, GDNF, steroidogenic factor 1, and GH was performed in RNA from whole ACRO and NFPA tumors. ACRO but not NFPA adenomas express RET and Pit1. GDNF expression in the tumors was positively correlated with RET and negatively correlated with p53. In conclusion, ACROs maintain an active RET/Pit1/p14Arf/p53/apoptosis pathway that is inhibited by GDNF. Disruption of GDNF's survival function might constitute a new therapeutic route in

  17. Assessment of Astrid reactor pit design options

    International Nuclear Information System (INIS)

    Verpoest, Thomas; Villedieu, Alexandre; Robin, Jean-Charles

    2014-01-01

    Answering the French Act of the 28. of June 2006 about nuclear materials and waste management, the ASTRID (Advanced Sodium Technological Reactor for Industrial Demonstration) Project has the objectives to demonstrate the industrial feasibility based on identified domains (safety, operability, economy) of Sodium-cooled Fast Reactor and to perform transmutation demonstrations. The pre-conceptual design, started in 2010, considers several reactor pit design options. One of the objectives is to define a reference configuration for the ASTRID project which is able to answer safety and design requirements. The components addressed in this article are: the safety vessel and the Decay Heat Removal system through the main vessel. The core catcher associated to the different configurations studied in this article is an internal core catcher (inside the main vessel). This article deals with the different locations of the DHR through the main vessel and the type of the safety vessel (supported versus suspended vessel). These options are studied in order to establish the advantages and drawbacks of the different configurations in terms of economy, safety, In Service Inspection and Repair (ISIR), operability, robustness, and project risk (authors)

  18. Optimization of coal recovery from open pits

    Energy Technology Data Exchange (ETDEWEB)

    Kim, C; Wolff, S F; Baafi, E Y; Cervantes, J A; Coates, D F

    1979-02-01

    The design techniques of the Pit Slope Manual were successfully applied in a case study concerned with optimizing the design of coal mines. A steeply dipping multiple seam deposit, being mined by the truck-shovel combination, was selected for the study. The criterion for optimum slopes was based on the financial consequences of each design, i.e., the resultant benefits and costs. Three alternative designs were analyzed. The first had an average highwall slope angle of 28 degrees and a final height of 290 m. The second had a 35 degrees slope angle and a 305-m wall height. The third had a 45 degrees slope angle and a 320-m wall height. Trade-off between benefits and increased cost of slope instability inherent in steeper slope angles was analyzed for the entire mine life through computer simulation of actual mining operations. The cost models developed were (1) No Cost, (2) Clean-up, (3) Lost Coal, (4) Early Mining, (5) Mine Abandonment, (6) Increased Haulage, and (7) Haul Road Re-establishment. (8 refs.)

  19. Microstructure and pitting corrosion of shielded metal arc welded high nitrogen stainless steel

    Directory of Open Access Journals (Sweden)

    Raffi Mohammed

    2015-09-01

    Full Text Available The present work is aimed at studying the microstructure and pitting corrosion behaviour of shielded metal arc welded high nitrogen steel made of Cromang-N electrode. Basis for selecting this electrode is to increase the solubility of nitrogen in weld metal due to high chromium and manganese content. Microscopic studies were carried out using optical microscopy (OM and field emission scanning electron microscopy (FESEM. Energy back scattered diffraction (EBSD method was used to determine the phase analysis, grain size and orientation image mapping. Potentio-dynamic polarization testing was carried out to study the pitting corrosion resistance in aerated 3.5% NaCl environment using a GillAC electrochemical system. The investigation results showed that the selected Cr–Mn–N type electrode resulted in a maximum reduction in delta-ferrite and improvement in pitting corrosion resistance of the weld zone was attributed to the coarse austenite grains owing to the reduction in active sites of the austenite/delta ferrite interface and the decrease in galvanic interaction between austenite and delta-ferrite.

  20. Analysis of disposal of uranium mill tailings in a mined out open pit

    International Nuclear Information System (INIS)

    Staub, W.P.; Triegel, E.K.

    1978-01-01

    Mined out open pits are presently under consideration as disposal sites for uranium mill tailings. In this method of tailings management, the escape of contaminated liquid into an adjacent aquifer is the principal environmental concern. The modified Bishop Method was used to analyze the structural stability of a clay liner along the highwall and fluid flow models were used to analyze the effect of tailings solutions on ground water under several operating conditions. Results of the slope stability analysis showed that it would be necessary to construct the clay liner as a modified form of engineered embankment. This embankment would be similar in construction to that of an earthfill dam. It could be constructed on a 1:1 slope provided the tailings slurry were managed properly. It would be necessary to maintain the freeboard height between the embankment and tailings at less than 4 m. A partially dewatered sand beach would have to be located adjacent to the embankment. Potential leakage and aquifer contamination was modeled for lined and unlined pits of various designs. Sulfate, and possibly U and Th, are the most likely contaminants. Results from the model showed the clay and soil cement lined pit to be most effective in containing the pollutants

  1. Floristic Survey of Summer Aspect in Chosen China Clay Pits in Western Bohemia

    Directory of Open Access Journals (Sweden)

    Kamila Botková

    2016-01-01

    Full Text Available Five different china clay pits in the western part of the Czech Republic were explored and plant species were determined. These chosen pits were: Hájek-western part, Chlumčany, Horní Bříza, Otovice and Podlesí II. China clay pits with active excavation represent a specific environment concerning both physical and chemical characteristics. This article is presenting a list of the higher plants which were found within active excavation or former excavation areas. Species with a protection status according to the Czech legislation are presented in more detail. 189 different species have been found in total, including 2 species from category C4 – potentially vulnerable taxa, 6 species from category C3 – endangered taxa and 1 species from the C1 – critically threatened taxa from the Red List of Vascular Plants of the Czech Republic. 28 different species occurred at each of the five sites. Predominant species favour sandy substratum and bare surface.

  2. Influence of remanent magnetization on pitting corrosion in pipeline steel

    Energy Technology Data Exchange (ETDEWEB)

    Espina-Hernandez, J. H. [ESIME Zacatenco, SEPI Electronica Instituto Politecnico Nacional Mexico, D. F. (Mexico); Caleyo, F.; Hallen, J. M. [DIM-ESIQIE, Instituto Politecnico Nacional Mexico D. F. (Mexico); Lopez-Montenegro, A.; Perez-Baruch, E. [Pemex Exploracion y Produccion, Region Sur Villahermosa, Tabasco (Mexico)

    2010-07-01

    Statistical studies performed in Mexico indicate that leakage due to external pitting corrosion is the most likely cause of failure of buried pipelines. When pipelines are inspected with the magnetic flux leakage (MFL) technology, which is routinely used, the magnetization level of every part of the pipeline changes as the MFL tool travels through it. Remanent magnetization stays in the pipeline wall after inspection, at levels that may differ from a point to the next. This paper studies the influence of the magnetic field on pitting corrosion. Experiments were carried out on grade 52 steel under a level of remanent magnetization and other laboratory conditions that imitated the conditions of a pipeline after an MLF inspection. Non-magnetized control samples and magnetized samples were subjected to pitting by immersion in a solution containing chlorine and sulfide ions for seven days, and then inspected with optical microscopy. Results show that the magnetic field in the pipeline wall significantly increases pitting corrosion.

  3. Studies in pitting corrosion on archaeological bronzes. Copper

    International Nuclear Information System (INIS)

    Bresle, Aa.; Saers, J.; Arrhenius, B.

    1983-01-01

    Copper has been proposed as a canister material for use in the long-term storage of radioactive waste from nuclear power reactors. The storage period has been set to at least 100 000 years, during which time the copper cylinders must remain intact so that the contained waste has no possibility of leaking out. In this work, the pitting factor in archaelogical copper objects have been determined. The absolute values of the pitting factor obtained are generally very low. In the case of the most thoroughly studied material the pitting factor is only slightly more than three units. Nor does the native copper, with a presumed burial period of about 8000 years, exhibit particularly high values. In summary, it can therefore be concluded that the present study does not provide support for the assumption of extremely high pitting factors in copper-base material that has been buried for periods of several millenia. (G.B.)

  4. Effect of microcrystallization on pitting corrosion of pure aluminium

    International Nuclear Information System (INIS)

    Meng Guozhe; Wei Liyan; Zhang Tao; Shao Yawei; Wang Fuhui; Dong Chaofang; Li Xiaogang

    2009-01-01

    A microcrystalline aluminium film with grain size of about 400 nm was prepared by magnetron sputtering technique. Its corrosion behaviour was investigated in NaCl containing acidic solution by means of potentiodynamic polarization curves and electrochemical noise (EN). The polarization results indicated that the corrosion potential of the sample shifted towards more positive direction, while its corrosion current density decreased compared with that of pure coarse-grain Al. The EN analysis based on stochastic model demonstrated that there existed two kinds of effect of microcrystallization on the pitting behaviour of pure aluminium: (1) the rate of pit initiation is accelerated, (2) the pit growth process was impeded. This leads to the enhancement of pitting resistance for the microcrystallized aluminium.

  5. A critical analysis of physiochemical properties influencing pit latrine ...

    African Journals Online (AJOL)

    African Journal of Environmental Science and Technology ... pit emptying devices and poor faecal sludge disposal contributing to environmental pollution. ... from each depth using a manual sampling tool and emptied into a plastic container.

  6. Status of the pit disassembly and conversion facility

    International Nuclear Information System (INIS)

    Wood, Warren T.; Christensen, Lowell T.

    2000-01-01

    A planned new facility, the Pit Disassembly and Conversion Facility (PDCF), will be used to disassemble the nation's inventory of surplus nuclear weapons pits and convert the plutonium from those pits into a form suitable for storage, international inspection, and final disposition. Sized to handle 35 metric tons of plutonium from pits and other sources over its 10-year operating life, the PDCF will apply the Advanced Recovery and Integrated Extraction System (ARIES) technology. ARIES process technology has been developed at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL), and an integrated system is being demonstrated at LANL. The Los Alamos National Laboratory is the lead for technical design oversight of the PDCF. Technical data gained from the ARIES demonstrations is integral for the proper design of the PDCF

  7. 105-KW Sandfilter Backwash Pit sludge volume calculation

    International Nuclear Information System (INIS)

    Dodd, E.N. Jr.

    1995-01-01

    The volume of sludge contained in the 100-KW Sandfilter Backwash Pit (SFBWP) was calculated from depth measurements of the sludge, pit dimension measurements and analysis of video tape recordings taken by an underwater camera. The term sludge as used in this report is any combination of sand, sediment, or corrosion products visible in the SFBWP area. This work was performed to determine baseline volume for use in determination of quantities of uranium and plutonium deposited in the pit from sandfilter backwashes. The SFBWP has three areas where sludge is deposited: (1) the main pit floor, (2) the transfer channel floor, and (3) the surfaces and structures in the SFBWP. The depths of sludge and the uniformity of deposition varies significantly between these three areas. As a result, each of the areas was evaluated separately. The total volume of sludge determined was 3.75 M 3 (132.2 ft 3 )

  8. Application of Surpac and Whittle Software in Open Pit Optimisation ...

    African Journals Online (AJOL)

    Michael

    2015-06-01

    Jun 1, 2015 ... The deposit has undergone intense weathering, forming an oxidised gold deposit ... total of 82 optimal pit outlines were generated using the 3D Lerchs-Grossmann algorithm. ... are also widely accepted in the mining industry.

  9. Template measurement for plutonium pit based on neural networks

    International Nuclear Information System (INIS)

    Zhang Changfan; Gong Jian; Liu Suping; Hu Guangchun; Xiang Yongchun

    2012-01-01

    Template measurement for plutonium pit extracts characteristic data from-ray spectrum and the neutron counts emitted by plutonium. The characteristic data of the suspicious object are compared with data of the declared plutonium pit to verify if they are of the same type. In this paper, neural networks are enhanced as the comparison algorithm for template measurement of plutonium pit. Two kinds of neural networks are created, i.e. the BP and LVQ neural networks. They are applied in different aspects for the template measurement and identification. BP neural network is used for classification for different types of plutonium pits, which is often used for management of nuclear materials. LVQ neural network is used for comparison of inspected objects to the declared one, which is usually applied in the field of nuclear disarmament and verification. (authors)

  10. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  11. New diagnostic technology and hidden pits and fissures caries

    OpenAIRE

    Fabrizio Guerra; Marta Mazur; Francesca Rinaldo; Denise Corridore; Daniele Salvi; Debora Pasqualotto; Gianna Maria Nardi; Livia Ottolenghi

    2015-01-01

    The accuracy in pits and fissures caries detection is of paramount importance in dental caries primary and secondary prevention. A combination of visual examination and probing is currently the mainstay of occlusal caries diagnosis. Unfortunately, these types of inspection alone may leave a certain number of pit and fissure caries undetected. The Vista Cam iX fluorescence camera (Durr Dental, Bietigheim-Bissingen, Germany) is a novel dental diagnostic tool for quantitative assessment of denta...

  12. Ecological geology environmental assessment of open-pit mines

    International Nuclear Information System (INIS)

    Dong Shuangfa; Jiang Xue

    2010-01-01

    In this paper, there is a detail description of ecological geology environmental assessment of open-pit mines, including method, process and results. We took ecological geology environmental assessment work on the base of the results of some open-pit mines such as extremely low content magnetite in Hebei Province, inducted and summarized the ecological geology environment quality. The results are reasonable. It provides basic data for the second mines programming in Hebei Province. (authors)

  13. Force-displacement measurements of earlywood bordered pits using a mesomechanical tester

    Science.gov (United States)

    Samuel L. Zelinka; Keith J. Bourne; John C. Hermanson; Samuel V. Glass; Adriana Costa; Alex C. Wiedenhoeft

    2015-01-01

    The elastic properties of pit membranes are reported to have important implications in understanding air-seeding phenomena in gymnosperms, and pit aspiration plays a large role in wood technological applications such as wood drying and preservative treatment. Here we present force–displacement measurements for pit membranes of circular bordered pits, collected on a...

  14. Statistical characterization of pitting corrosion process and life prediction

    International Nuclear Information System (INIS)

    Sheikh, A.K.; Younas, M.

    1995-01-01

    In order to prevent corrosion failures of machines and structures, it is desirable to know in advance when the corrosion damage will take place, and appropriate measures are needed to mitigate the damage. The corrosion predictions are needed both at development as well as operational stage of machines and structures. There are several forms of corrosion process through which varying degrees of damage can occur. Under certain conditions these corrosion processes at alone and in other set of conditions, several of these processes may occur simultaneously. For a certain type of machine elements and structures, such as gears, bearing, tubes, pipelines, containers, storage tanks etc., are particularly prone to pitting corrosion which is an insidious form of corrosion. The corrosion predictions are usually based on experimental results obtained from test coupons and/or field experiences of similar machines or parts of a structure. Considerable scatter is observed in corrosion processes. The probabilities nature and kinetics of pitting process makes in necessary to use statistical method to forecast the residual life of machine of structures. The focus of this paper is to characterization pitting as a time-dependent random process, and using this characterization the prediction of life to reach a critical level of pitting damage can be made. Using several data sets from literature on pitting corrosion, the extreme value modeling of pitting corrosion process, the evolution of the extreme value distribution in time, and their relationship to the reliability of machines and structure are explained. (author)

  15. Deterministic chaos in the pitting phenomena of passivable alloys

    International Nuclear Information System (INIS)

    Hoerle, Stephane

    1998-01-01

    It was shown that electrochemical noise recorded in stable pitting conditions exhibits deterministic (even chaotic) features. The occurrence of deterministic behaviors depend on the material/solution severity. Thus, electrolyte composition ([Cl - ]/[NO 3 - ] ratio, pH), passive film thickness or alloy composition can change the deterministic features. Only one pit is sufficient to observe deterministic behaviors. The electrochemical noise signals are non-stationary, which is a hint of a change with time in the pit behavior (propagation speed or mean). Modifications of electrolyte composition reveals transitions between random and deterministic behaviors. Spontaneous transitions between deterministic behaviors of different features (bifurcation) are also evidenced. Such bifurcations enlighten various routes to chaos. The routes to chaos and the features of chaotic signals allow to suggest the modeling (continuous and discontinuous models are proposed) of the electrochemical mechanisms inside a pit, that describe quite well the experimental behaviors and the effect of the various parameters. The analysis of the chaotic behaviors of a pit leads to a better understanding of propagation mechanisms and give tools for pit monitoring. (author) [fr

  16. Risk assessment to groundwater of pit latrine rural sanitation policy in developing country settings.

    Science.gov (United States)

    Back, Jan O; Rivett, Michael O; Hinz, Laura B; Mackay, Nyree; Wanangwa, Gift J; Phiri, Owen L; Songola, Chrispine Emmanuel; Thomas, Mavuto A S; Kumwenda, Steve; Nhlema, Muthi; Miller, Alexandra V M; Kalin, Robert M

    2018-02-01

    Parallel global rise in pit-latrine sanitation and groundwater-supply provision is of concern due to the frequent spatial proximity of these activities. Study of such an area in Malawi has allowed understanding of risks posed to groundwater from the recent implementation of a typical developing-country pit-latrine sanitation policy to be gained. This has assisted the development of a risk-assessment framework approach pragmatic to regulatory-practitioner management of this issue. The framework involves water-supply and pit-latrine mapping, monitoring of key groundwater contamination indicators and surveys of possible environmental site-condition factors and culminates in an integrated statistical evaluation of these datasets to identify the significant factors controlling risks posed. Our approach usefully establishes groundwater-quality baseline conditions of a potentially emergent issue for the study area. Such baselines are foundational to future trend discernment and contaminant natural attenuation verification critical to policies globally. Attribution of borehole contamination to pit-latrine loading should involve, as illustrated, the use of the range of contamination (chemical, microbiological) tracers available recognising none are ideal and several radial and capture-zone metrics that together may provide a weight of evidence. Elevated, albeit low-concentration, nitrate correlated with some radial metrics and was tentatively suggestive of emerging latrine influences. Longer term monitoring is, however, necessary to verify that the commonly observed latrine-borehole separation distances (29-58m), alongside statutory guidelines, do not constitute significant risk. Borehole contamination was limited and correlation with various environmental-site condition factors also limited. This was potentially ascribed to effectiveness of attenuation to date, monitoring of an emergent problem yet to manifest, or else contamination from other sources. High borehole usage

  17. The heparin-binding domain of HB-EGF mediates localization to sites of cell-cell contact and prevents HB-EGF proteolytic release

    Energy Technology Data Exchange (ETDEWEB)

    Prince, Robin N.; Schreiter, Eric R.; Zou, Peng; Wiley, H. S.; Ting, Alice Y.; Lee, Richard T.; Lauffenburger, Douglas A.

    2010-07-01

    Heparin-binding EGF-like growth factor (HB-EGF) is a ligand for EGF receptor (EGFR) and possesses the ability to signal in juxtacrine, autocrine and/or paracrine mode, with these alternatives being governed by the degree of proteolytic release of the ligand. Although the spatial range of diffusion of released HB-EGF is restricted by binding heparan-sulfate proteoglycans (HSPGs) in the extracellular matrix and/or cellular glycocalyx, ascertaining mechanisms governing non-released HB-EGF localization is also important for understanding its effects. We have employed a new method for independently tracking the localization of the extracellular EGFlike domain of HB-EGF and the cytoplasmic C-terminus. A striking observation was the absence of the HB-EGF transmembrane proform from the leading edge of COS-7 cells in a wound-closure assay; instead, this protein localized in regions of cell-cell contact. A battery of detailed experiments found that this localization derives from a trans interaction between extracellular HSPGs and the HBEGF heparin-binding domain, and that disruption of this interaction leads to increased release of soluble ligand and a switch in cell phenotype from juxtacrine-induced growth inhibition to autocrine-induced proliferation. Our results indicate that extracellular HSPGs serve to sequester the transmembrane pro-form of HB-EGF at the point of cell-cell contact, and that this plays a role in governing the balance between juxtacrine versus autocrine and paracrine signaling.

  18. Decree No 74-945 of 6 November 1974 concerning gaseous radioactive effluent releases from large nuclear installations and nuclear installations located on the same site

    International Nuclear Information System (INIS)

    1974-01-01

    This Decree prescribes the licensing for the release of gaseous wastes from nuclear installations as well as the technical supervision of such operations. It does not apply to the transport of radioactive effluents which is governed by the regulations on the transport of dangerous goods. (NEA) [fr

  19. Treatability study work plan for in situ vitrification of seepage pit 1 in Waste Area Grouping 7 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Spalding, B.P.

    1994-07-01

    A treatability study is described that encompasses the application of in situ vitrification (ISV) to at least two segments of Oak Ridge National Laboratory (ORNL) seepage pit 1 by the end of fiscal year 1995. This treatability study will establish the field-scale technical performance of ISV for (1) attaining the required depth, nominally 15 ft, to incorporate source contamination within and beneath the pits; (2) demonstrating field capability for the overlapping melt settings that are necessary to achieve fused melt segments; (3) demonstrating off-gas handling technology for accommodating and minimizing the volatilization of 137 Cs; (4) demonstrating adequate site characterization techniques to predict ISV melting kinetics, processing temperatures, and product durability; and (5) promoting public acceptance of ISV technology by demonstrating its safety, implementability, site impacts, and air emissions and by coordinating the treatability study within the regulatory closure process. The initial step of this treatability study will be to gather the required site characterization data about pit 1 so that the in situ vitrification can be effectively and safely planned. The second phase will be the field ISV operations at pit 1 employing at least two settings to achieve overlapping and fused melts. Such field operations are likely to require 6 to 8 weeks. Following termination of ISV melting operations at pit 1 and demobilization of portable ISV equipment and the off-gas hood, posttest characterization activities will begin

  20. Numerical Investigation on Stress Concentration of Tension Steel Bars with One or Two Corrosion Pits

    Directory of Open Access Journals (Sweden)

    Jian Hou

    2015-01-01

    Full Text Available Pitting corrosion has been observed in steel bars of existing reinforced concrete (RC structures in different erosion environments and has been identified as a potential origin for fatigue crack nucleation. In the present study, under uniaxial tension loading, stress distribution in the steel bars with one or two semiellipsoidal corrosion pits has systematically been investigated by conducting a series of three-dimensional semiellipsoidal pitted models. Based on the finite element analyses, it is shown that stress concentration factor (SCF increases linearly with increasing pit aspect ratio (a/b and increases nonlinearly with increasing pit relative depth (a/R for single corrosion pit problem. For double corrosion pits problem, the SCF decreases nonlinearly with increasing angle of two transverse pits (θ. The interaction of two longitudinal pits can be ignored in the calculation of SCF even if the distance of two pits (d is very small.

  1. A ground-based magnetic survey of Frenchman Flat, Nevada National Security Site and Nevada Test and Training Range, Nevada: data release and preliminary interpretation

    Science.gov (United States)

    Phillips, Jeffrey D.; Burton, Bethany L.; Curry-Elrod, Erika; Drellack, Sigmund

    2014-01-01

    The Nevada National Security Site (NNSS, formerly the Nevada Test Site) is located in southern Nevada approximately 105 kilometers (km) (65 miles) northwest of Las Vegas. Frenchman Flat is a sedimentary basin located on the eastern edge of NNSS and extending eastward into the adjacent Nevada Test and Training Range (NTTR).

  2. The design and analysis of salmonid tagging studies in the Columbia Basin. Volume 2: Estimating salmonid survival with combined PIT-CWT tagging. Technical report

    International Nuclear Information System (INIS)

    Newman, K.

    1997-06-01

    Passive Integrated Transponder (PIT) tags and Coded Wire Tags (CWTs) in combination can provide information about salmonid survival that single tag releases may not. The release and recapture protocol affects which survival and recapture rates can be estimated and the precision of the estimates. For the particular case of Columbia river salmonids tagged with both PIT tags and CWTs, three different release and recapture protocols were evaluated. This report addresses the need to study the fate of salmon smolt in-river and their subsequent return as adults. Double-tagging procedures are investigated where PIT-tags would be used to provide in-river survival data during smolt outmigrations and coded-wire tags (CWT) used to provide adult return information. This report provides statistical models for the analysis of the joint data as well as recommendations on optimal tagging studies. Study costs and stress on smolt can be reduced by only PIT-tagging a subset of all the fish coded-wire-tagged, while retaining the information content and sampling precision

  3. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 1, Text: Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-08-01

    Waste Area Grouping (WAG) 4 is one of 17 WAGs within and associated with Oak Ridge National Laboratory (ORNL). WAG 4 is located south of the main facility along Lagoon Road. WAG 4 consists of three separate areas: Solid Waste Storage Area (SWSA) 4, a shallow-land-burial ground containing radioactive and potentially hazardous wastes; an experimental Pilot Pit Area, which includes a pilot-scale testing pit; and sections of two abandoned underground pipelines used for transporting liquid, low-level, radioactive waste. SWSA 4 is the largest site at WAG 4, covering approximately 23 acres. In the 1950s, SWSA 4 received a variety of low- and high-activity wastes, including transuranic wastes, all buried in trenches and auger holes. Recent surface water data, collected during monitoring of the tributary to White Oak Creek as part of WAG 2 investigations as well as during previous studies conducted at WAG 4, indicate that a significant amount of 90 Sr is being released from the old burial trenches in SWSA 4. This release represents a significant portion of the ORNL off-site risk (DOE 1993). With recent corrective measures the proportion of the release has increased in 1995. A detailed discussion of the site history and previous investigations is presented in the WAG 4 Preliminary Assessment Report, ORNL/ER-271 (Energy Systems 1994b). In an effort to control the sources of the 90 Sr release and to reduce the off-site risk, a site investigation was initiated to pinpoint those trenches that are the most prominent 90 Sr sources

  4. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  5. Statement of Basis/Proposed Plan for the P-Area Burning Rubble Pit (131-P)

    International Nuclear Information System (INIS)

    Bland, T.

    2002-01-01

    The Statement of Basis/Proposed Plan (SB/PP) is being issued by the United States Department of Energy (USDOE), which functions as the lead agency for Savannah River Site (SRS) remedial activities, with concurrence by the United States Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this SB/PP is to describe the preferred remedial alternatives for the P-Area Burning/Rubble Pit (131-P) (PBRP) Operable Unit (OU) and to provide for public involvement in the decision-making process

  6. Study of firedamp release in sub-level caving

    Energy Technology Data Exchange (ETDEWEB)

    Castano, F.S.; Sanz Delgado, M.A.; Iturriaga Trenor, S.; Alberdi Vinas, C.

    1988-01-01

    The field work developed in the pits of 'Hullera Vasco-Leonesa' in Santa Lucia (Leon) to control firedamp release is described. Conclusions obtained concerning gas emission, irregularity and firedamp balance in sub-level caving winning faces are discussed. Some definitions of basic concepts in firedamp studies are also included. 7 figs.

  7. Modelling effects of tree population dynamics, tree throw and pit-mound formation/diffusion on microtopography over time in different forest settings

    Science.gov (United States)

    Martin, Y. E.; Johnson, E. A.; Gallaway, J.; Chaikina, O.

    2011-12-01

    Herein we conduct a followup investigation to an earlier research project in which we developed a numerical model of tree population dynamics, tree throw, and sediment transport associated with the formation of pit-mound features for Hawk Creek watershed, Canadian Rockies (Gallaway et al., 2009). We extend this earlier work by exploring the most appropriate transport relations to simulate the diffusion over time of newly-formed pit-pound features due to tree throw. We combine our earlier model with a landscape development model that can incorporate these diffusive transport relations. Using these combined models, changes in hillslope microtopography over time associated with the formation of pit-mound features and their decay will be investigated. The following ideas have motivated this particular study: (i) Rates of pit-mound degradation remain a source of almost complete speculation, as there is almost no long-term information on process rates. Therefore, we will attempt to tackle the issue of pit-mound degradation in a methodical way that can guide future field studies; (ii) The degree of visible pit-mound topography at any point in time on the landscape is a joint function of the rate of formation of new pit-mound features due to tree death/topple and their magnitude vs. the rate of decay of pit-mound features. An example of one interesting observation that arises is the following: it appears that pit-mound topography is often more pronounced in some eastern North American forests vs. field sites along the eastern slopes of the Canadian Rockies. Why is this the case? Our investigation begins by considering whether pit-mound decay might occur by linear or nonlinear diffusion. What differences might arise depending on which diffusive approach is adopted? What is the magnitude of transport rates associated with these possible forms of transport relations? We explore linear and nonlinear diffusion at varying rates and for different sizes of pit-mound pairs using a

  8. Fast Track Characterization of Highly Radioactive Waste Pits Combining Off-the-Shelf Robotics with Innovative Investigation Protocols

    International Nuclear Information System (INIS)

    Chabeuf, Jean-Michel; Boya, Didier

    2008-01-01

    The investigation and characterization of radioactive waste pits and effluent storage tanks represents a substantial and challenging step in the overall decommissioning programme launched by AREVA NC in 1998 on the site of Marcoule on behalf of the French Atomic Energy commission. Physical ,radiological and regulatory constraints, combined with a tight schedule, have lead our teams to use proven conventional instrumentation and robotics in innovative configurations . One such investigation, conducted on a particularly challenging radioactive effluent storage pit, is described below. The 'H' pit is a stainless steel clad concrete cavity, located in the second basement of the de-cladding building of Marcoule site. It was used for forty years as buffer storage for high activity effluents and has a length of 5 meters, a width of 3 meters , a height of 2.5 meters, and is topped by lead plates over 5 cm thick and The bottom of the cavity is covered with a layer of mud containing mainly graphite, diatoms and resins. The mud level ranges from about 20 centimeters to over 50 centimeters. The overall mud volume is around 2.4 cubic meters. Ambient dose rates above the lead plates exceed 10 mSv/h. The main purpose of our investigation was to characterize the muds for future recovery and conditioning prior to decontaminating the pit. The history of the pit together with the varying mud altimetry lead us to believe that sedimentation had probably occurred throughout the years. We thus decided to combine dose rate measurements using IF104 probes, gamma spectroscopy with CdTe probes and sample collections at different depths to ensure the representativeness and full characterization of the muds. Poor access, ambient dose rates have lead us to conceive a robotic arm, mounted on an shaft which can be modified to fit a wide range of pits and tanks. Custom built robotic tools with maximum manoeuvrability generally involve costs and delays far exceeding our purposes. SIT, a French

  9. White phosphorus pits focused feasibility study final July 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Davis, B.; Martino, L.

    2007-08-21

    The White Phosphorus Burning Pits (WPP) Area of Concern (AOC) is a site of about 5.5 acres (2.2 ha) located in the J-Field Study Area, in the Edgewood Area of Aberdeen Proving Ground (APG), Maryland (Figure 1.1). Considerable information about the WPP exists as a result of efforts to characterize the hazards associated with J-Field. Contamination in the J-Field Study Area was first detected during an environmental survey of the APG Edgewood Area conducted in 1977 and 1978 (Nemeth et al. 1983) by the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA; predecessor to the U.S. Army Environmental Center). As part of a subsequent USATHAMA environmental survey, 11 wells were installed and sampled at J-Field (three of them at the WPP) (Nemeth 1989). Contamination was also detected in 1983 during a munitions disposal survey conducted by Princeton Aqua Science (1984). The Princeton Aqua Science investigation involved installing and sampling nine wells (four at the WPP) and collecting and analyzing surficial and deep composite soil samples (including samples from the WPP area). In 1986, the U.S. Environmental Protection Agency (EPA) issued a Resource Conservation and Recovery Act (RCRA) Permit (MD3-21-002-1355) requiring a post-wide RCRA Facility Assessment (RFA) and a hydrogeologic assessment of J-Field. In 1987, the U.S. Geological Survey (USGS) began a two-phase hydrogeologic assessment in which data were collected to model groundwater flow at J-Field. Soil-gas investigations were conducted, several well clusters were installed (four at the WPP), a groundwater flow model was developed, and groundwater and surface water monitoring programs were established that continue today. The results of the USGS study were published by Hughes (1993).

  10. The differences of saliva pH before and after application of Bis-GMA resin based-pit and fissure sealant

    Directory of Open Access Journals (Sweden)

    Ayub Irmadani Anwar

    2016-06-01

    Full Text Available Pit and fissure sealant applications is one way to prevent caries. One of the effective ingredient as a pit and fissure sealant is a Bis-GMA resin. One of the active components  of  Bis-GMA  resin  is  sodium  fluoride,  which is capable  of releasing fluoride ions to the tooth surface and able to improve the repair and remineralization process through the replacement  of  calcium and phosphate ions found in saliva to increase the pH of saliva. This study was to determine the effect of pit and fissure sealant applications made from Bis-GMA resin to pH of saliva in children aged 6-12 years. The study design is pre and post test with control group design. Saliva samples were derived from 15 pediatric patients has met the criteria. The pH of saliva were taken before and after the application of pit and fissure sealant made from Bis-GMA and measured with pH meter. This study used a non-parametric test, the Wilcoxon Signed Rank test. The results of this study are also supported by the results of statistical tests showed p-: 0.005 (p<0.05 value, which means that there are significant differences in pH of saliva before and after the application of pit and fissure sealant made from Bis-GMA resin.

  11. Modelling assessment of End Pit Lakes meromictic potential

    International Nuclear Information System (INIS)

    2006-11-01

    The use of End Pit Lakes have been proposed as a remediation solution for oil sands reclamation and operational waters. This report modelled the main factors controlling the occurrence of stratification in Pit Lakes in order to establish design and management guidelines for the Cumulative Environmental Management Association's End Pit Lake Sub-group. The study focused on End Pit Lake size, depth, starting lake salinity concentrations, inflow rates and inflow salinity flux, and investigated their influence on density gradients. One-dimensional modelling and limited 2-D modelling simulations were conducted to examine meromictic potential for a large range of End Pit Lake configurations and conditions. Modelling results showed that fall is the governing season for determining meromixis. The expelling of salt from saline water upon ice formation and its effect on stratification potential and the effect of fresh water loading on stratification potential during spring melt events were not observed to be dominant factors governing meromictic potential for the scenarios examined in the study. Results suggested that shallow End Pit Lakes showed a high turn-over rate with seasonal heating and cooling cycles. Moderately deep End Pit Lakes demonstrated a meromictic potential that was inversely proportional to lake size and require higher starting salinities. With a 2 or 10 million m 3 /yr inflow rate and a 5 parts per thousand starting salinity, a 50 m deep End Pit Lake achieved meromixis at all 3 size ranges considered in the study. Results also showed that the rate of influent salinity decrease was the least important of the parameters influencing meromixis. It was observed that meromixis was a temporary condition in all of the End Pit Lake scenarios envisioned due to the lack of a constant, positive salt replenishment over the long term. It was concluded that further 3-D modelling is required to represent littoral areas as well as to account for extreme winter conditions. A

  12. Pitting of Incoloy 800 in presence of CuII

    International Nuclear Information System (INIS)

    Bianchi, G.L.; Alvarez, M.G.

    1993-01-01

    The pitting behaviour of Incoloy 800 in presence of Cu II ions, at 60 degrees C and 280 degrees C was studied by long term exposition of specimens in aqueous cupric chloride solutions. At 60 degrees C experiments were performed in aerated (7 ppm O 2 ) and deaerated solutions containing 500, 1000, 2000, 10000 and 20000 ppm CuCl 2 . At 280 degrees C experiments were performed in deaerated 20 ppm, 50 ppm and 100 ppm CuCl 2 solutions. During each experiment the open circuit potential of the alloy was measured as a function of time. After corrosion test the specimens were examined by Scanning Electron Microscopy for the presence of pits. In another set of experiments potentiodynamic anodic polarization curves were used to determine the pitting potential of Incoloy 800 in deaerated NaCl solutions at chloride concentrations and pH values corresponding to those possessed by solutions containing 20 ppm to 20000 ppm CuCl 2 . At 60 degrees C pitting was observed in those solutions where the CuCl 2 concentration is higher than 1000 ppm. At 280 degrees C pitting was found in the specimens exposed to those solutions where the CuCl 2 concentration was higher than 20 ppm. (author). 3 refs

  13. Herniation pits of the femur neck: incidence and radiologic findings

    International Nuclear Information System (INIS)

    Cho, Jae Hyun; Suh, Jin Suk; Lee, Hye Yeon

    1994-01-01

    In order to assess the incidence and radiologic findings of herniation pit of the femur neck in Korean. In 152 macerated femurs of 88 cadavers, and randomly selected 115 hips of 70 patients, the presence of herniation pit was determined by using fluoroscopy and radiography. It was then examined by CT for inspection of overlying surface and its opening was confirmed by inserting thin steal wire under the fluoroscopic guidance. Seventeen herniation pits in 15 macerated femurs of 13 cadavers were noted. (14.8%, 13/88). Two of 13 individuals showed bilaterality. All lesions were found only in males. Six herniation pit in 6 femurs of 6 patients (8.6%, 6/70) were also noted. All lesions were on anterosuperior aspect of femur neck. Plain radiographs of macerated femurs revealed well marginated and thin sclerosis in 15 lesions. Of all 23 lesions, CT showed cortical breakdown in 3, and overlying cortical thickening in 8. In 15 macerated femurs, roughed area of cortex was found in anterosuperior aspect of femur in all cases, and tiny openings(diameter less than 1 mm) related to cystic lesions were confirmed in 9 lesions. The incidence of herniation pits was 14.8% in 88 cadaver, and 8.6% in 70 patients. All were males

  14. Ras-dva is a novel Pit-1- and glucocorticoid-regulated gene in the embryonic anterior pituitary gland.

    Science.gov (United States)

    Ellestad, Laura E; Porter, Tom E

    2013-01-01

    Glucocorticoids play a role in functional differentiation of pituitary somatotrophs and lactotrophs during embryogenesis. Ras-dva was identified as a gene regulated by anterior neural fold protein-1/homeobox expressed in embryonic stem cells-1, a transcription factor known to be critical in pituitary development, and has an expression profile in the chicken embryonic pituitary gland that is consistent with in vivo regulation by glucocorticoids. The objective of this study was to characterize expression and regulation of ras-dva mRNA in the developing chicken anterior pituitary. Pituitary ras-dva mRNA levels increased during embryogenesis to a maximum on embryonic day (e) 18 and then decreased and remained low or undetectable after hatch. Ras-dva expression was highly enriched in the pituitary gland on e18 relative to other tissues examined. Glucocorticoid treatment of pituitary cells from mid- and late-stage embryos rapidly increased ras-dva mRNA, suggesting it may be a direct transcriptional target of glucocorticoids. A reporter construct driven by 4 kb of the chicken ras-dva 5'-flanking region, containing six putative pituitary-specific transcription factor-1 (Pit-1) binding sites and two potential glucocorticoid receptor (GR) binding sites, was highly activated in embryonic pituitary cells and up-regulated by corticosterone. Mutagenesis of the most proximal Pit-1 site decreased promoter activity in chicken e11 pituitary cells, indicating regulation of ras-dva by Pit-1. However, mutating putative GR binding sites did not substantially reduce induction of ras-dva promoter activity by corticosterone, suggesting additional DNA elements within the 5'-flanking region are responsible for glucocorticoid regulation. We have identified ras-dva as a glucocorticoid-regulated gene that is likely expressed in cells of the Pit-1 lineage within the developing anterior pituitary gland.

  15. Geologic Emissions of Methane and C2 - C5 Alkanes at the La Brea Tar Pits, Los Angeles, CA

    Science.gov (United States)

    Doezema, L. A.; Etiope, G.; Pacheco, C.

    2017-12-01

    Natural hydrocarbon (oil and gas) seeps are widespread in Los Angeles due to gas migration, along faults, from numerous subsurface petroleum fields. These seeps may represent important natural contributors of methane (CH4) and heavier alkanes (C2-C4) for the atmosphere. Methane flux measurements were made from various locations at the La Brea Tar Pits in Los Angeles, CA. Measurements were made using a closed-chamber method and spectroscopic sensors for CH4 and CO2, at 26 oil-asphalt seeps and 188 other sites, without gas manifestations, homogeneously distributed throughout the park. The molecular C1 - C5 composition of gas released from seeps and soil was also analyzed using either FTIR spectroscopy or gas chromatography (GC-FID). Methane emissions from seeps varied from approximately 7 to 54,000 g m-2 day-1, while emissions from soil degassing were between 0 and 9,000 g m-2 day-1. Total emissions were estimated to be in the order of 103 kg day-1 for methane, and at least 10 and 5 kg day-1 for ethane and propane, respectively. The seeping gas exhibited high C1/(C2 + C3) ratios, likely due to molecular fractionation during gas migration from a subsurface petroleum reservoir. Evidence for biodegredation in certain samples was indicated by large i-butane to n-butane ratios. These molecular alterations can be important tracers of natural seepage and should be considered in the atmospheric modelling of the relative contribution of fossil fuel (anthropogenic fugitive emission and natural geologic sources) vs biogenic sources, on local and global scales.

  16. Investigation report of the release of strontium-90 from the Building 3517 Cell Ventilation Improvements construction site on November 29, 1985

    International Nuclear Information System (INIS)

    1986-01-01

    This Type B Investigative Report provides an evaluation of all relevant events and activities that led to, were an integral part of, and subsequently resulted from ORNL's November-December 1985 strontium-90 release incident. The impacts were evaluated in terms of radiological doses to ORNL and Rust employees associated with the incident, ORGDP employees who consumed potable water potentially impacted by the incident, and Kingston, Tennessee, residents who also consumed potable water potentially impacted by the incident; and in terms of reductions in ORNL's low-level liquid radioactive waste storage capabilities. The management systems evaluated include: (1) those intended to reduce the potential of occurrence of such events and (2) those intended to provide adequate response to such events should they occur. Inherent in the management system evaluations were reviews of applicable planning activities and intra- and inter-organization communications. The composition of the investigation board and its appointment letter are contained in Appendix 1. The investigation process included analyses of existing procedures; analyses of environmental data collected just prior to, during, and subsequent to the event; and interviews and discussions with ORNL, ORGDP, DOE, and Rust Engineering personnel. In addition, written comments on the draft report were received from Rust Engineering (Letter from R.C. Stuck to B.C. Scott, dated February 24, 1986, Subject: Investigation of ORNL's November-December 1985 Strontium-90 Release Incident) and they were considered in the preparation of the final document

  17. Salmon Site Remedial Investigation Report, Appendix B (Part 2)

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  18. Salmon Site Remedial Investigation Report, Appendix B (Part 1)

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  19. DOJ News Release: New York Man Ordered to Pay Over $400,000 in Restitution and Fines for Role in Kickback Scheme at New Jersey Superfund Sites

    Science.gov (United States)

    WASHINGTON, D.C. – An Amherst, New York, man was ordered to pay over $400,000 in restitution and fines and placed on five years’ probation for his role in a kickback scheme at the Federal Creosote and Diamond Alkali Superfund sites in New Jersey.

  20. Optimal grade control sampling practice in open-pit mining

    DEFF Research Database (Denmark)

    Engström, Karin; Esbensen, Kim Harry

    2017-01-01

    Misclassification of ore grades results in lost revenues, and the need for representative sampling procedures in open pit mining is increasingly important in all mining industries. This study evaluated possible improvements in sampling representativity with the use of Reverse Circulation (RC) drill...... sampling compared to manual Blast Hole (BH) sampling in the Leveäniemi open pit mine, northern Sweden. The variographic experiment results showed that sampling variability was lower for RC than for BH sampling. However, the total costs for RC drill sampling are significantly exceeding current costs...... for manual BH sampling, which needs to be compensated for by other benefits to motivate introduction of RC drilling. The main conclusion is that manual BH sampling can be fit-for-purpose in the studied open pit mine. However, with so many mineral commodities and mining methods in use globally...

  1. Dewatering of planned Key Lake open pits in northern Saskatchewan

    International Nuclear Information System (INIS)

    Unland, W.; Holl, N.

    1980-01-01

    The engineering design and experience gained so far with a dewatering system for an open-pit uranium mine planned at Key Lake in Northern Saskatchewan are presented. An extensive unconfined overburden aquifer is hydraulically connected with the underlying Athabasca Formation and basement rocks, both of relatively low hydraulic conductivity. The overburden aquifer is embedded in a bedrock trough, with the deepest depression between the planned pits. Hydrogeological data were used in a numerical dewatering model simulating groundwater flow at different stages of the pit development. Based on the model results, the enginering design had to provide for different pumping rates, varying between 1.0 and 0.21 m 3 /sec. This problem was solved by using a double line pressure system. The design concept for the complete peripheral discharge system and the well design used for 26 dewatering wells are discussed. (auth)

  2. Congenital upper lip pit: A rare case report

    Directory of Open Access Journals (Sweden)

    Leena James

    2015-01-01

    Full Text Available One of the rarest developmental malformations of the lip is congenital lip pits. They are usually seen as bilateral depressions in the vermilion zone of the lip and occur on the paramedian portion of the vermilion border of the lip. They are extremely rare in the upper lip. Lip pits are due to the failure of complete union of embryonic lateral sulci of the lip/notching of lip at an early stage of development with fixation of tissues of the base of the notch. Lip pits have also been associated with a variety of other congenital disorders and other malformations. The clinical and pathologic picture and the therapeutic aspects of this condition are discussed in this paper.

  3. Fukushima Nuclear Accident Recorded in Tibetan Plateau Snow Pits

    Science.gov (United States)

    Wang, Ninglian; Wu, Xiaobo; Kehrwald, Natalie; Li, Zhen; Li, Quanlian; Jiang, Xi; Pu, Jianchen

    2015-01-01

    The β radioactivity of snow-pit samples collected in the spring of 2011 on four Tibetan Plateau glaciers demonstrate a remarkable peak in each snow pit profile, with peaks about ten to tens of times higher than background levels. The timing of these peaks suggests that the high radioactivity resulted from the Fukushima nuclear accident that occurred on March 11, 2011 in eastern Japan. Fallout monitoring studies demonstrate that this radioactive material was transported by the westerlies across the middle latitudes of the Northern Hemisphere. The depth of the peak β radioactivity in each snow pit compared with observational precipitation records, suggests that the radioactive fallout reached the Tibetan Plateau and was deposited on glacier surfaces in late March 2011, or approximately 20 days after the nuclear accident. The radioactive fallout existed in the atmosphere over the Tibetan Plateau for about one month. PMID:25658094

  4. Detection of Pitting in Gears Using a Deep Sparse Autoencoder

    Directory of Open Access Journals (Sweden)

    Yongzhi Qu

    2017-05-01

    Full Text Available In this paper; a new method for gear pitting fault detection is presented. The presented method is developed based on a deep sparse autoencoder. The method integrates dictionary learning in sparse coding into a stacked autoencoder network. Sparse coding with dictionary learning is viewed as an adaptive feature extraction method for machinery fault diagnosis. An autoencoder is an unsupervised machine learning technique. A stacked autoencoder network with multiple hidden layers is considered to be a deep learning network. The presented method uses a stacked autoencoder network to perform the dictionary learning in sparse coding and extract features from raw vibration data automatically. These features are then used to perform gear pitting fault detection. The presented method is validated with vibration data collected from gear tests with pitting faults in a gearbox test rig and compared with an existing deep learning-based approach.

  5. Tritium migration studies at the Nevada Test Site

    International Nuclear Information System (INIS)

    Schulz, R.K.; Weaver, M.O.

    1993-05-01

    Emanation of tritium from waste containers is a commonly known phenomenon.