WorldWideScience

Sample records for pipeline right-of-way efeitos

  1. Urbanization: the pipelines ROW (Right-of-Way) future

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Gilberto; Malzone, Vivian de Araujo Oliveira [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The accelerated process of urbanization that is shifting the aspects of Brazilian cities - most clearly in South East and South region states - is inherently involved with decayed levels of quality of life and little or any concern at all with the sustainability of such urban expansion. Besides the social difficulties generated from this non-planned growth - mainly in the cities' outskirts - there are many questions related to urbanization that should be reconsidered such as water, soil and air pollution; lack of water resources; floods, insufficient public transport and traffic problems; urban infra-structure and lodging privations and inadequate soil installment. This paper aims at showing how this disordered urban growth plays an important role on PETROBRAS' pipeline right of way located at the great cities urban areas, more specifically the Urban Right Of Way that cross the metropolitan region of the city of Sao Paulo. Also, it is an objective to express how such urbanization propitiate the execution of basic infra-structure in a way of integrating habitation, sanitation, environment and geotechnical sectors with the purposes of PETROBRAS of maintaining as priority the integrity of the pipelines located on the ROW as well as the integrity of these ROW themselves. (author)

  2. Use of GRASS for routing gas pipeline rights-of-way

    International Nuclear Information System (INIS)

    Sydelko, P.J.

    1992-01-01

    This study, sponsored by the Gas Research Institute (GRI), was conducted to illustrate how a GIS (Geographic Information System) can be used to assess alternative routes for new gas pipeline rights-of-way (ROWs). The results show that a least-cost analysis using GRASS (Geographic Resources Analysis and Support System) is a good method for siting new gas pipeline ROWs on the basis of environmental and engineering constraints to pipeline construction and maintenance. The cost and time needed to use this least-cost approach compare favorably with the current methods used by gas pipeline company planners and engineers. The types of criteria used, as well as the costs or weights given to the criteria, can be changed easily. This provides the flexibility to assess several alternatives quickly and easily

  3. DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS

    International Nuclear Information System (INIS)

    James E. Huebler

    2002-01-01

    Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage could be prevented if potentially hazardous construction equipment could be detected and identified before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with an optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachment. The work performed in the first quarter of the project includes development of the Research Management Plan, writing a paper assessing of the state-of-the-art in encroachment and third party damage detection, and development of factors for selecting the optical fiber sensors

  4. Intrusion detection on oil pipeline right of way using monogenic signal representation

    Science.gov (United States)

    Nair, Binu M.; Santhaseelan, Varun; Cui, Chen; Asari, Vijayan K.

    2013-05-01

    We present an object detection algorithm to automatically detect and identify possible intrusions such as construction vehicles and equipment on the regions designated as the pipeline right-of-way (ROW) from high resolution aerial imagery. The pipeline industry has buried millions of miles of oil pipelines throughout the country and these regions are under constant threat of unauthorized construction activities. We propose a multi-stage framework which uses a pyramidal template matching scheme in the local phase domain by taking a single high resolution training image to classify a construction vehicle. The proposed detection algorithm makes use of the monogenic signal representation to extract the local phase information. Computing the monogenic signal from a two dimensional object region enables us to separate out the local phase information (structural details) from the local energy (contrast) thereby achieving illumination invariance. The first stage involves the local phase based template matching using only a single high resolution training image in a local region at multiple scales. Then, using the local phase histogram matching, the orientation of the detected region is determined and a voting scheme gives a certain weightage to the resulting clusters. The final stage involves the selection of clusters based on the number of votes attained and using the histogram of oriented phase feature descriptor, the object is located at the correct orientation and scale. The algorithm is successfully tested on four different datasets containing imagery with varying image resolution and object orientation.

  5. Use of geographic information systems for applications on gas pipeline rights-of-way

    Energy Technology Data Exchange (ETDEWEB)

    Sydelko, P.J.; Wilkey, P.L.

    1992-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  6. 30 CFR 250.1010 - General requirements for pipeline right-of-way holders.

    Science.gov (United States)

    2010-07-01

    ... United States or its lessees or right-of-way holders, as the case may be, the full value of all damages...). The right-of-way holder shall make available all records relative to the design, construction... site. Furthermore, the holder is responsible for accidents or damages which might occur as a result of...

  7. Subsoil TPH contamination in two oil pipeline pumping stations and one pipeline right-of-way in north Mexico.

    Science.gov (United States)

    Iturbe, R; Flores-Serrano, R M; Castro, A; Flores, C; Torres, L G

    2010-11-01

    This investigation deals with the characterization carried out in zones around two pipeline pumping stations and one pipeline right-of-way in the north of Mexico. In particular those areas where contamination was evaluated: (a) south area of the separation ditch in the Avalos station, (b) the area between the separation ditch at the Avalos station, (c) km 194+420 of the Moctuzma station, and (d) km 286+900 in the Candelaria station. Results of this investigation showed that only four samples showed TPH values higher than the Mexican limit for 2004: AVA 1B, with 21,191 mg kg(-1); AVA 1C, with 9348 mg kg(-1); AVA 2B, with 13,970 mg kg(-1); and MOC 2A, with 4108 mg kg(-1).None of the sampled points showed the presence of PAHs at values higher than those found in the Mexican or American legislations. PAH were detected in the range of 0.0004 and 13.05 mg kg(-1).It is suggested to implement surfactant soil washing as a remediation technique for the approximately 600 m(3) that need to be treated. Copyright 2010 Elsevier Ltd. All rights reserved.

  8. 30 CFR 250.1016 - Granting pipeline rights-of-way.

    Science.gov (United States)

    2010-07-01

    ... Section 250.1016 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL... process, for the assessment and management of OCS oil and gas transportation. (b) Should the proposed... comments. (d) If a proposed right-of-way crosses any lands not subject to disposition by mineral leasing or...

  9. Environmental and urbanistic upgrade of Obati Pipelines right-of-way; Recuperacao ambiental e urbanistica dos dutos Obati

    Energy Technology Data Exchange (ETDEWEB)

    Penteado, Ralfo [Oena Assessoria e Consultoria Ltda. (Brazil); Duailibi, Miriam [Instituto ECOAR para a Cidadania, Sao Paulo, SP (Brazil)

    2003-07-01

    This paper sets for the description of the methodology, strategies and activities of Obati environmental and urbanistic upgrade. Obati is a 50 km. pipeline, built in 1974, that runs from Barueri to Sao Caetano do Sul terminals. From 70's decade the metropolitan region of Sao Paulo grew tremendously and thousands of poor people happened to live just at Obati's right of way limits. Being aware of its social and environmental responsibility, PETROBRAS decided to improve the situation and settled a brand new program in which engineering works were added to an environmental education and social communication program. The results were the integrity of pipeline's right of way , a better life quality of the neighborhood and the accomplishment and partnership of citizens, company and local government to keep the area safe and to sustain the whole program. (author)

  10. Regeneration of vegetation on wetland crossings for gas pipeline rights-of-way one year after construction

    International Nuclear Information System (INIS)

    Shem, L.M.; Zimmerman, R.E.; Zellmer, S.D.; Van Dyke, G.D.; Rastorfer, J.R.

    1993-01-01

    Four wetland crossings of gas pipeline rights-of-way (ROWs), located in Florida, Michigan, New Jersey, and New York, were surveyed for generation of vegetation roughly one year after pipeline construction was completed. Conventional trench-and-fill construction techniques were employed for all four sites. Estimated areal coverage of each species by vegetative strata within transect plots was recorded for plots on the ROW and in immediately adjacent wetlands undisturbed by construction activities. Relative success of regeneration was measured by percent exposed soil, species diversity, presence of native and introduced species, and hydric characteristics of the vegetation. Variable site factors included separation and replacement of topsoil, final grading of the soil, application of seed and fertilizer, and human disturbance unrelated to construction. Successful regeneration exhibited greater dependency on the first three factors listed

  11. Standardization process for pipeline right-of-way activities: the case of TRANSPETRO's Oil Pipeline and Terminals Business Unit

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Kassandra Senra de Morais M.; Goncalves, Bruno Martins [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico

    2009-07-01

    This paper describes the experience of PETROBRAS Transporte S.A. concerning the standardization process for its pipeline right-of-way (ROW) activities. This standardization initiative has been carried out within the Oil Pipelines and Terminals Standardization Program (PRONOT), focusing on planning, standardization and implementation of all norms and corporate procedures referring to TRANSPETRO's right-of-way activities. The process promoted the integration of isolated regional initiatives, a sense of unity and the creation of a learning network consisting of 60 employees. This paper presents the last phase's results concerning implementation of corporate standards, based upon achievements of previous phases. It covers the following topics: a general view of the whole process by way of introduction; the potential of integration of recent standardization results with TRANSPETRO's corporate management tools and information systems; definition of four performance indicators and their metrics related to pipeline right-of-way management, as well as a corporate standard for the requirements for contracting services related to rights-of-way inspection, maintenance and communication; challenges, barriers and benefits perceived by the team responsible for formulating and implementing standards and procedures in TRANSPETRO's Oil Pipelines and Terminals Unit. (author)

  12. Sub-soil contamination due to oil spills in zones surrounding oil pipeline-pump stations and oil pipeline right-of-ways in Southwest-Mexico.

    Science.gov (United States)

    Iturbe, Rosario; Flores, Carlos; Castro, Alejandrina; Torres, Luis G

    2007-10-01

    Oil spills due to oil pipelines is a very frequent problem in Mexico. Petroleos Mexicanos (PEMEX), very concerned with the environmental agenda, has been developing inspection and correction plans for zones around oil pipelines pumping stations and pipeline right-of-way. These stations are located at regular intervals of kilometres along the pipelines. In this study, two sections of an oil pipeline and two pipeline pumping stations zones are characterized in terms of the presence of Total Petroleum Hydrocarbons (TPHs) and Polycyclic Aromatic Hydrocarbons (PAHs). The study comprehends sampling of the areas, delimitation of contamination in the vertical and horizontal extension, analysis of the sampled soils regarding TPHs content and, in some cases, the 16 PAHs considered as priority by USEPA, calculation of areas and volumes contaminated (according to Mexican legislation, specifically NOM-EM-138-ECOL-2002) and, finally, a proposal for the best remediation techniques suitable for the contamination levels and the localization of contaminants.

  13. 76 FR 75894 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way; Submitted for Office of...

    Science.gov (United States)

    2011-12-05

    ...) Submit repair report 3 1008(f) Submit report of pipeline failure analysis...... 30 1008(g) Submit plan of... usual and customary business practice; required burden is minimal to make available to BSEE. Estimated... and provide your total capital and startup cost components or annual operation, maintenance, and...

  14. Comparison of revegetation of a gas pipeline right-of-way in two forested wetland crossings involving conventional methods of pipeline installation and horizontal drilling, Nassau County, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology; Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1993-10-01

    One year after pipeline installation, vegetation in the right-of-way (ROW) was inventoried at two stream floodplain crossings in Nassau County, Florida. Both sites were forested wetlands composed of Acer rubrum, Fraxinus caroliniana, Liquidamber styraciflua, Nyssa ogecho, Quercus laurifolia, and Taxodium distichum, together with other wetland trees. Pipeline installation across the Brandy Branch floodplain was by conventional ditching and backfill methods. Installation across the Deep Creek floodplain was by horizontal drilling after clearcutting the ROW. The latter method left tree stumps, understory vegetation, and soil layers intact, except for disruptions caused by logging. According to the inventory, vegetation at the drilled site was more diverse (nearly twice as many species occurring in the ROW as at the trenched site) and more robust (no unvegetated exposed soil compared to 15% at the trenched site). Differences between the ROW vegetation at the two sites can be attributed to both site differences and installation technologies used.

  15. TPH and PAH concentrations in the subsoil of polyduct segments, oil pipeline pumping stations, and right-of-way pipelines from Central Mexico

    Science.gov (United States)

    Iturbe, Rosario; Castro, Alejandrina; Perez, Guillermina; Flores, Carlos; Torres, Luis G.

    2008-10-01

    For the year 1996, 366 incidents related with clandestine poaching of oil-products were reported in Mexico, 159 in 1997, and 240 in 1998. For the year 2003 (the most recently reported figure), there were 136 events. Petroleos Mexicanos (PEMEX), very concerned with the environmental agenda, has developed programs oriented to diminish contamination levels in all of its oil facilities. This work was aimed at characterizing zones around polyduct segments, pipelines, pumping stations, and right-of-way pipelines located in the center of Mexico. The TPH contaminated sites were, in decreasing order, polyduct km 39 + 150 > polyduct km 25 + 020 > Zoquital > Tepetitlan > Catalina > Venta Prieta > Ceiba. Most of the sampled points showed the presence of more than one of the 16 PAHs considered by USEPA as priority pollutants. Except point TEPE 2A, where no PAHs were detected, all the sampled points showed values from low to medium concentrations; however, values found at the sites did not exceed the limits according to the Mexican or the American legislation. The place with the largest contaminated area corresponded to the polyduct km 39 + 150, with 130 m2 and 260 m3 to be treated. The least contaminated area was that around the JUAN 4 point at Juandho station, with 20 m2 and 22 m3 of contaminated soil. The total area to be treated is about 230 m2 and 497 m3.

  16. Environmental management of pipeline and right-of-way; Gerenciamento ambiental em servicos de manutencao de dutos e faixas de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Carlos A.R.; Alves, Anibal J.C.; Chaves, Claudia J.M.M.; Campos, Cleber L.S.; Guarda, Juliana G.S.; Magalhaes, Milton P; Neto, Nilo M.C. [TRANSPETRO - PETROBRAS Transporte, Rio de Janeiro, RJ (Brazil); Yogui, Regiane T.T. [Bureau Veritas do Brasil, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    This paper presents the environmental management experience of TRANSPETRO in the State of Sao Paulo, Brazil, in maintenance services on pipelines and pipeline right-of-way areas, focusing on the requirements of these services in order to ensure the integrity of the system and on the limitations in connection with a great number of authorizations and governmental agencies involved and the use of the environmental management as a solution. These services include, basically, replacement of pipeline sections, geotechnical and upgrading services in right-of-way areas in a pipeline network of about 3700 km, implemented in a wide range of environments, from urban areas to environmentally protected areas. In the first place, consideration is given to the complex legal question related to the various laws and the necessity to obtain approvals such as licenses, authorizations, awards and statements of commitment pertaining to the great number of governmental agencies involved. Subsequently, the main environmental impacts pertaining to said services are approached, with presentation of the tools used in Environmental Management, such as analysis of environmental hazards and aspects, contractual requirements, plans, guideline sheets, procedures, training and monitoring. At the end, a description is presented of the difficulties met, of the solutions adopted and of the new attitudes that are required for a continuous improvement of the process. (author)

  17. Usage of laser techniques and digital aerial coverage as a layer for as-built applied to the LPG pipeline Urucu-Coari right-of-way

    Energy Technology Data Exchange (ETDEWEB)

    Furquim, Antonio J. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    The usage of taking of digital aerial images is a reality worldwide, but in Brazil there is few sensors in use available, which makes recognize the pioneer aspect of the technique. Something similar also occurs with the airborne LASER scanning, whose technique has been applied for more time, used in the obtaining of digital terrain models. The use of digital imaging along with the LASER survey can offer an option for the generation of high quality products in a very fast and efficient way, aiming at numberless applications. Among such applications, the generation of cartographic products for the implantation of pipelines, as well as the as-built drawings of these same rights-of-ways after the implantation can be highlighted. The pipeline sector has been the focus of great investments and keeps on presenting demand for new projects and implantations. That allows to deduce that the speed in the generation of accurate bases for such purpose shall progress towards the continuous development of such aerial survey techniques. This paper presents the application of images and LASER survey to obtain ortho photos of Urucu-Coari liquefied petroleum gas (LPG) pipeline. (author)

  18. Right Of Way Pest Control. Manual 88.

    Science.gov (United States)

    Missouri Univ., Columbia. Agricultural Experiment Station.

    This training manual provides information needed to meet the minimum EPA standards for certification as a commercial applicator of pesticides in the right-of-way pest control category. The text discusses types of vegetation, the nature of herbicides, application methods, use for specific situations, and safety precautions. (CS)

  19. ROW (Right-of-Way) interfering construction activities management program

    Energy Technology Data Exchange (ETDEWEB)

    Rosito, Roberta; Oliveira, Marisa; Lima, Shirley [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A significant portion of pipeline failures occurs due to external damage. This includes third party right of way (ROW) encroachment, which shall be identified and avoided. However, injuries caused by known and planned activities do happen. Construction of crossing or sharing ROW pipelines, crossing roads and bridges, neighboring buildings and excavations of any kind might put existing pipelines in risk. This paper presents how the TRANSPETRO ROW Interfering Construction Activities Management Program is implemented by a regional ROW maintenance department responsible for more than 3,000 km of pipelines, mostly in Rio de Janeiro and Minas Gerais states. This program is based on a TRANSPETRO procedure that was written after the publication of the Official Order number 125 of ANP (Oil, Gas and Biofuel Brazilian National Agency). Tasks from design review and approval to field construction supervision are performed by the staff responsible for the routine patrols and maintenance management. The ability of foreseeing risky activities is improved by expertise gained from day-to-day work on site. (author)

  20. 36 CFR 4.20 - Right of way.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Right of way. 4.20 Section 4... TRAFFIC SAFETY § 4.20 Right of way. An operator of a motor vehicle shall yield the right of way to pedestrians, saddle and pack animals and vehicles drawn by animals. Failure to yield the right of way is...

  1. 36 CFR 1004.20 - Right of way.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Right of way. 1004.20 Section 1004.20 Parks, Forests, and Public Property PRESIDIO TRUST VEHICLES AND TRAFFIC SAFETY § 1004.20 Right of way. An operator of a motor vehicle shall yield the right of way to pedestrians, saddle and pack...

  2. 25 CFR 169.18 - Tenure of approved right-of-way grants.

    Science.gov (United States)

    2010-04-01

    ..., and public utility water pipelines (including pumping stations and appurtenant facilities), electric... 169.18 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER RIGHTS-OF-WAY OVER... sanitary and storm sewer lines including sewage disposal and treatment plants, water control and use...

  3. Railroad right-of-way incident analysis research.

    Science.gov (United States)

    2011-04-01

    Locations of railroad right-of-way incidents in this research were identified as hotspots. These can be defined as highway-rail grade crossings or locations along the railroad right-of-way where collision or trespassing risk is unacceptably high and ...

  4. Right of way real property asset management : prototype data architecture.

    Science.gov (United States)

    2009-02-01

    The Texas Department of Transportation (TxDOT) is responsible for managing 1.1 million acres of land that : provide right of way for approximately 80,000 centerline miles of state-maintained roads. Management of : the huge right of way asset involves...

  5. Project WP#422: Consolidated Research Program, Right of Way Automated Monitoring Threat Prevention (Topic Area #1); Leak Detection (Topic Area #2)

    Science.gov (United States)

    2012-08-30

    Preventing unauthorized intrusions on pipeline Right of Ways (ROWs) and mechanical damage due to third party strikes by machinery is a constant challenge for the pipeline industry. Equally important for safety and environmental protection is the dete...

  6. Maglev guideway route alignment and right-of-way requirements

    Science.gov (United States)

    Carlton, S.; Andriola, T.

    1992-12-01

    The use of existing rights-of-way (ROW) is assessed for maglev systems by estimating trip times and land acquisition requirements for potential maglev corridors while meeting passenger comfort limits. Right-of-way excursions improve trip time but incur a cost for purchasing land. The final report documents findings of the eight tasks in establishing right-of-way feasibility by examining three city-pair corridors in detail and developing an approximation method for estimating route length and travel times in 20 additional city-pair corridor portions and 21 new corridors. The use of routes independent of existing railroad or highway right-of-way have trip time advantages and significantly reduce the need for aggressive guideway geometries on intercity corridors. Selection of the appropriate alignment is determined by many corridor specific issues. Use of existing intercity rights-of-way may be appropriate for parts of routes on a corridor-specific basis and for urban penetration where vehicle speeds are likely to be reduced by policy due to noise and safety considerations, and where land acquisition costs are high. Detailed aspects of available rights-of-way, land acquisition costs, geotechnical issues, land use, and population centers must be examined in more detail on a specific corridor basis before the proper or best maglev alignment can be chosen.

  7. 32 CFR 636.25 - Right-of-way.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Right-of-way. 636.25 Section 636.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.25 Right-of...

  8. Environmental studies for right of way; Levantamento ambiental das faixas de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Savian, Michelle; Oliveira, Robson A. de; Fabri, Camila; Chichorro, Cristiano [Esteio Engenharia e Aerolevantamentos S.A., Curitiba, PR (Brazil)

    2003-07-01

    Esteio S.A. was hired to accomplish in a pioneering way the Environmental Survey of approximately 5.000 kilometers of right-of-way, all over the country. To execute this work, Esteio collected several information as: Maps basic data (Topographical, Geological and Pedological) and cadastral field data that resulted respectively in a GIS (Geographical Information System) of thematic maps and a database with information of the pipeline corridor and their proximity. The final products will allow the management of the pipeline corridor in an integrated way, besides the elaboration of sensibility maps and environmental vulnerability. In case of accidents with the pipeline, it allows to combat it in an optimized way, applying a more appropriate logistics, reducing the response time with the intention to protect and to preserve in the best way the whole involved environment, minimizing environmental impacts. (author)

  9. Reclaiming deserted corridors: Rights of way as common property resources

    International Nuclear Information System (INIS)

    Brown, D.T.

    1993-01-01

    In Canada, power line transmission corridors are administered and maintained by provincial crown utilities. These corridors have fragmented natural habitats, destroyed biota, and disrupted geological and hydrologic systems. The practices used by utilities to maintain their rights-of-way tend to worsen the environmental and social context of the localities affected by the corridors. If the corridors are considered as common resources, and if co-management of these resources is undertaken involving the utilities and the communities affected by the corridors, public rights-of-way would be created which would have environmental benefits. These corridors would have a recreational potential and could be managed so as to reduce considerably the negative impacts presently generated by current right-of-way management practices. The use of local residents in this management process could ensure that the use of the corridors harmonizes with local needs. Among the obstacles to the co-management of these corridors are the badly defined policies of secondary land use, the restrictions on vegetation maintenance in utility corridors, lengthy approvals processes, and concerns about public liability. To make co-management of these corridors a reality, new policy structures and new procedures have to be developed in cooperation with the utilities and the affected communities. 14 refs., 1 fig

  10. Motorcycle right-of-way accidents--a literature review.

    Science.gov (United States)

    Pai, Chih-Wei

    2011-05-01

    The most typical automobile-motorcycle collision take places when an automobile manoeuvres into the path of an approaching motorcycle by violating the motorcycle's right of way (ROW). The present paper provides a comprehensive review of past research that examined motorcycle ROW accidents. Articles and publications were selected for relevance and research strength through a comprehensive search of major databases such as Transportation Research Information Services (TRIS), Compendex, and Medline. Two major causes of such a crash scenario are the lack of motorcycle conspicuity and motorist's speed/distance judgment error, respectively. A substantial number of studies have manipulated physical characteristics of motorcycles and motorcyclists to enhance conspicuity, along with research addressing motorists' gap-acceptance behaviours and arrival time judgments when confronting motorcycles. Although various conspicuity aids have proven effective, some researchers reported that motorcyclist's/motorcycle's brightness per se may be less important as a determinant of conspicuity than brightness contrast between the motorcyclists and the surroundings. Larger vehicles tended to be judged to arrive sooner than motorcycles. Such a speed/distance judgment error is likely attributable to some psychological effects such that larger automobiles appear more threatening than motorcycles. Older motorists particularly have difficulties in accurately estimating the distance and the speed of an approaching motorcycle. Research examining the effects of conspicuity measures on motorists' speed/distance judgments when confronting motorcycles has been rather inconclusive. Past research offers valuable insight into the underlying motorcycle ROW crash mechanisms. However, with ageing society and a rapid change in traffic composition (e.g., more larger motorcycles) in recent years, prior research findings should be updated. The present study finally provides recommendations for future research

  11. 32 CFR 643.124 - Rights-of-way for ferries and livestock.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Rights-of-way for ferries and livestock. 643.124... PROPERTY REAL ESTATE Additional Authority of Commanders § 643.124 Rights-of-way for ferries and livestock. Installation commanders are authorized to grant permits for the landing of ferries and driving of livestock...

  12. 49 CFR 195.412 - Inspection of rights-of-way and crossings under navigable waters.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Inspection of rights-of-way and crossings under navigable waters. 195.412 Section 195.412 Transportation Other Regulations Relating to Transportation... Inspection of rights-of-way and crossings under navigable waters. (a) Each operator shall, at intervals not...

  13. Safe, Effective Use of Pesticides, A Manual for Commercial Applicators: Right-of-Way Pest Control.

    Science.gov (United States)

    Extension Service (USDA), Washington, DC.

    This manual is intended to assist pesticide applicators who are engaged in right-of-way pest control to meet the requirements of the Michigan Department of Agriculture for certification. While the majority of material in this guide pertains to vegetation management, the guide also addresses right-of-way insect and fungus control. An introduction…

  14. Right-of-Way Acquisition and Utility Adjustment Process Duration Information Tool (RUDI) User Guide.

    Science.gov (United States)

    2008-07-01

    Ever since right of way acquisition has been an organized business activity in Texas, : involved and affected parties both sides of the R/W line have asked the question How long does : it take to acquire right of way? And, When will this new hi...

  15. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Science.gov (United States)

    2010-04-01

    ...-way projects. The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects. ... 23 Highways 1 2010-04-01 2010-04-01 false Concurrent junkyard control and right-of-way projects...

  16. 76 FR 28397 - Acceleration of Broadband Deployment by Improving Policies Regarding Public Rights of Way and...

    Science.gov (United States)

    2011-05-17

    ... franchising or rights of way laws; and total time to process applications. To the extent that certain... comprehensive state franchising or rights of way laws; whether the charges are published in advance or... interested parties to submit examples of model, typical, and problematic franchising or access agreements. 16...

  17. 76 FR 8992 - National Trails System Act and Railroad Rights-of-Way

    Science.gov (United States)

    2011-02-16

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...

  18. Strategic plan to optimize the management of right-of-way parcel and utility information at FDOT.

    Science.gov (United States)

    2013-05-01

    The Florida Department of Transportation (FDOT) manages a huge right-of-way asset. Examples of core : processes related to this asset include determining right-of-way boundaries; inventorying roadside features; : preparing right-of-way maps; acquirin...

  19. Easements, MDTA Right of Way Easement, Right of Way Easement, Right of Way Easement on I 95, Fort McHenry Tunnel, Baltimore Harbor tunnel, Francis Scott Key Bridge, Published in 2010, 1:1200 (1in=100ft) scale, Maryland Transportation Authority.

    Data.gov (United States)

    NSGIC State | GIS Inventory — Easements dataset current as of 2010. MDTA Right of Way Easement, Right of Way Easement, Right of Way Easement on I 95, Fort McHenry Tunnel, Baltimore Harbor tunnel,...

  20. Regulatory assessment of proposed accessibility guidelines for pedestrians in the public right-of-way

    Science.gov (United States)

    2011-06-30

    This report assesses the potential costs and benefits of proposed accessibility guidelines issued by the Access Board for pedestrian facilities in the public right-of-way. The report also analyzes the potential impacts of the proposed guidelines on s...

  1. Assessment of bioenergy crop production along North Carolina right-of-ways.

    Science.gov (United States)

    2012-04-01

    The production of flowering oilseeds along highway right-of-ways provides land managers with a unique opportunity to meet safety and vegetation management objectives while providing enhance roadside aesthetics for motorists. Additionally, these opera...

  2. Economic impact of ecosystem services provided by ecologically sustainable roadside right of way vegetation management practices.

    Science.gov (United States)

    2014-03-01

    The economic value of runoff prevention, carbon sequestration, pollination and other insect services, air quality, : invasive species resistance, and aesthetics was estimated for Floridas State Highway System roadside right-of-way (ROW) ecosystem ...

  3. Demographic profile of intentional fatalities on railroad rights-of-way in the United States.

    Science.gov (United States)

    2013-08-01

    One of the Federal Railroad Administrations (FRA) primary safety concerns is trespassing on railway rights-of-way. Some trespasser events end as fatalities which can be intentional or unintentional. This project reviews available trespasser data t...

  4. Development of decision-making support tools for early right-of-way acquisitions.

    Science.gov (United States)

    2010-01-01

    This report documents the work performed during phase two of Project 0-5534, Asset Management Texas : Style. This phase included gathering historical Texas Department of Transportation (TxDOT) right-of-way : acquisition information, analyzi...

  5. Urban Rights-of-Way as Reservoirs for Tall-Grass Prairie Plants and Butterflies

    Science.gov (United States)

    Leston, Lionel; Koper, Nicola

    2016-03-01

    Urban rights-of-way may be potential reservoirs of tall-grass prairie plants and butterflies. To determine if this is true, in 2007-2008, we conducted vegetation surveys of species richness and cover, and butterfly surveys of species richness and abundance, along 52 transmission lines and four remnant prairies in Winnipeg, Manitoba. We detected many prairie plants and butterflies within transmission lines. Some unmowed and infrequently managed transmission lines had native plant species richness and total percent cover of native plants comparable to that of similar-sized remnant tall-grass prairies in the region. Although we did not find significant differences in overall native butterfly numbers or species richness between rights-of-way and remnant prairies, we found lower numbers of some prairie butterflies along frequently mowed rights-of-way than within remnant tall-grass prairies. We also observed higher butterfly species richness along sites with more native plant species. By reducing mowing and spraying and reintroducing tall-grass prairie plants, urban rights-of-way could serve as extensive reservoirs for tall-grass prairie plants and butterflies in urban landscapes. Eventually, managing urban rights-of-way as reservoirs for tall-grass prairie plants and animals could contribute to the restoration of tall-grass prairie in the North American Midwest.

  6. Urban Rights-of-Way as Reservoirs for Tall-Grass Prairie Plants and Butterflies.

    Science.gov (United States)

    Leston, Lionel; Koper, Nicola

    2016-03-01

    Urban rights-of-way may be potential reservoirs of tall-grass prairie plants and butterflies. To determine if this is true, in 2007-2008, we conducted vegetation surveys of species richness and cover, and butterfly surveys of species richness and abundance, along 52 transmission lines and four remnant prairies in Winnipeg, Manitoba. We detected many prairie plants and butterflies within transmission lines. Some unmowed and infrequently managed transmission lines had native plant species richness and total percent cover of native plants comparable to that of similar-sized remnant tall-grass prairies in the region. Although we did not find significant differences in overall native butterfly numbers or species richness between rights-of-way and remnant prairies, we found lower numbers of some prairie butterflies along frequently mowed rights-of-way than within remnant tall-grass prairies. We also observed higher butterfly species richness along sites with more native plant species. By reducing mowing and spraying and reintroducing tall-grass prairie plants, urban rights-of-way could serve as extensive reservoirs for tall-grass prairie plants and butterflies in urban landscapes. Eventually, managing urban rights-of-way as reservoirs for tall-grass prairie plants and animals could contribute to the restoration of tall-grass prairie in the North American Midwest.

  7. Apply Pesticides Correctly, A Guide for Commercial Applicators: Right-of-Way Pest Control.

    Science.gov (United States)

    Wamsley, Mary Ann, Ed.; Vermeire, Donna M., Ed.

    This guide contains basic information to meet specific standards for pesticide applicators. The text is concerned with the recognition of weeds and methods of their control in rights-of-way. Different types of application equipment both airborne and ground are discussed with precautions for the safe and effective use of herbicides. (CS)

  8. Roadway alignments as assets: evaluating alternatives for valuing major highway corridor rights of way.

    Science.gov (United States)

    2010-12-01

    In most highway asset management exercises, real estate used in alignments is considered to be an asset class that does not depreciate. Although the treatment of right of way assets as non-depreciable real property may be appropriate as an accounting...

  9. Right-of-way management: A key to controlling the spread of cogograss (Imperata cylindrica)

    Science.gov (United States)

    W.H. Faircloth; M.G. Patterson; James H. Miller; D.H. Teem

    2004-01-01

    Cogongrass [Imperata cylindrica(L.) Beauv.] is an undesired species on highway rights-of-way (ROWS) due to its displacenent of native and/or more manageable grasses, unsightly growth characteristic, and propensity for fire. Fire not only poses a danger to motorists but could cause property loss to adjoining landowners. Most importantly, ROWS provide...

  10. 77 FR 25910 - National Trails System Act and Railroad Rights-of-Way

    Science.gov (United States)

    2012-05-02

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION...) for rail banking and interim trail use under the National Trails System Act (Trails Act). New rules are adopted that require the parties jointly to notify the Board when an interim trail use/rail...

  11. Radiological Survey Results for the Niagara Mohawk Right-of-Way, Tonawanda, New York (TNY004)

    International Nuclear Information System (INIS)

    McKenzie, S.P.; Uziel, M.S.

    1998-01-01

    At the request of the U.S. Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey of a small portion of the Niagara Mohawk Power Corporation right-of-way in Tonawanda, New York. The purpose of the survey was to determine if radioactive residuals had migrated from or been redistributed onto the Niagara Mohawk right-of-way from the former Linde property to the west. The Linde Air Products Division of Union Carbide Corporation, Tonawanda New York, had used radioactive materials at that location for work performed under government contract from 1942 through 1948. The survey was performed in May 1996 in response to Formerly Utilized Sites Remedial Action Program (FUSRAP) requirements. These requirements dictate that the radiological status of certain vicinity properties shall be assessed and documented according to prescribed procedures prior to certification of the property for release for unrestricted use. Such release can only be granted if the property is found to be within current applicable authorized limits. The survey included a gamma scan of accessible areas and the collection and radionuclide analysis of soil samples from the portion of right-of-way located east of the former Linde plant site and north of the railway spur entrance gate. Results of the survey indicate that radioactive material probably originating from the Linde plant is located on the Niagara Mohawk right-of-way in the area surveyed. Surface gamma exposure rates were elevated above typical background levels. Four scattered surface soil samples exceeded DOE guideline values for 238 U, and 8 of 13 surface soil samples exceeded DOE guideline values for 226 Ra. The radionuclide distribution in these samples was similar to that found in materials resulting from former processing activities at the Linde site. It is recommended that the property be designated for remedial action by DOE

  12. 49 CFR 195.210 - Pipeline location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  13. OSBRA right of way characterization in Vila Estrutural, Brasilia, Brazil; Caracterizacao de faixa do OSBRA na Vila Estrutural em Brasilia - evidencia de uma nova relacao da TRANSPETRO com a comunidade

    Energy Technology Data Exchange (ETDEWEB)

    Brito, Walderes Lima de; Castro, Newton Camelo de [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Braga, Gilberto Vieira [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    In this project we will introduce the relationship experience between TRANSPETRO and Vila Estrutural community, located in Guara, D.C., what we consider a social responsibility practice and an important tool of the integrity maintenance of right of way pipelines, considering the risks caused by other people actions. In this specific case, Vila Estrutural is the most critical one, of Sao Paulo - Brasilia pipelines (OSBRA): irregular occupations, with an estimated population by 25,000 people, with an inhabit strangle and development constructions tendency in the straight ahead direction of pipelines. To deal with this reality, OSBRA management created a strategy called 'Acquaintance Communication', increasing the knowledge about the community (diagnostic), promoting to yours employees an acquaintance culture (qualifying); developing communications strategies with those that live nearby right of the pipelines way (relationship); and finally, building the stonemason of the characterization of the right of way pipelines as a real device and right of the way protection (framing). This work is lined up with the idea of an integrated communication, using many strategies (visits, meetings, argument groups, etc.), constituting in a corporative social responsibility practice, admitting the community right of information and knowing it the right manner of living nearby the right of way pipeline, resulting in the equipment integrity, asserting the community safety and environment maintenance. (author)

  14. Compressibility of peat and estimation of drainage settlement of a road right-of-way

    International Nuclear Information System (INIS)

    Saarilahti, M.

    1991-01-01

    The settlement of peatland road right-of-way can be estimated on the basis of geotechnology. The modulus of compression and the compression index measured by consolidation tests and the obtained values were tested against the observed settlement data from a literature survey. The regression coefficient between observed and calculated settlement was 0.84 when using only load factor (depth of ditches) as an independent variable, and 0.92 when peat moisture content was included into the model. Compression index gave a little higher correlation coefficients, 0.92-0.94. It seems possible to develop simple settlement calculation methods for fores road planning and construction

  15. Development of a native plant prescription for urban hydro rights of way

    Energy Technology Data Exchange (ETDEWEB)

    Suffling, R.; Lamb, L.; Murphy, S. [Waterloo Univ., Waterloo, ON (Canada)

    1998-12-31

    Ontario Hydro commissioned a study to determine how to control tall woody vegetation on rights-of-way since trees cause power leakage and make maintenance difficult. The objective was to find an environmentally benign solution to the problem. The study assessed the feasibility of using seven different herbaceous species of prairie affinity on rights-of-way in urban areas. Tallgrass prairie has long been known to inhibit invasion of woody species. A total of 64 plots were prepared and sown using four different methods. Effectiveness of the program was assessed by collating the abundance of the seven sown species for each of the four methods and by soil analysis to measure changes in the population of viable seeds in the soil. Results showed that the most effective strategy to establish the widest variety of species was to apply a fertilizer (glyphosate) in the Fall, and sowing a mix of species soon after, followed by rototilling in the spring and sowing a different mix. Seedbank observations proved useful in showing huge numbers of viable seeds surviving after long periods (40 years) without soil disturbance,. 3 refs., 1 tab., 2 figs.

  16. Development of a native plant prescription for urban hydro rights of way

    International Nuclear Information System (INIS)

    Suffling, R.; Lamb, L.; Murphy, S.

    1998-01-01

    Ontario Hydro commissioned a study to determine how to control tall woody vegetation on rights-of-way since trees cause power leakage and make maintenance difficult. The objective was to find an environmentally benign solution to the problem. The study assessed the feasibility of using seven different herbaceous species of prairie affinity on rights-of-way in urban areas. Tallgrass prairie has long been known to inhibit invasion of woody species. A total of 64 plots were prepared and sown using four different methods. Effectiveness of the program was assessed by collating the abundance of the seven sown species for each of the four methods and by soil analysis to measure changes in the population of viable seeds in the soil. Results showed that the most effective strategy to establish the widest variety of species was to apply a fertilizer (glyphosate) in the Fall, and sowing a mix of species soon after, followed by rototilling in the spring and sowing a different mix. Seedbank observations proved useful in showing huge numbers of viable seeds surviving after long periods (40 years) without soil disturbance,. 3 refs., 1 tab., 2 figs

  17. 36 CFR 14.5 - Nature of interest granted; settlement on right-of-way; rights of ingress and egress.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Nature of interest granted; settlement on right-of-way; rights of ingress and egress. 14.5 Section 14.5 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR RIGHTS-OF-WAY Nature of Interest § 14.5 Nature...

  18. 49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.

    Science.gov (United States)

    2010-10-01

    ... statement must be in the following form: Statement of Willingness To Assume Financial Responsibility In... user continuing to meet the financial obligations for the right-of-way. The CITU will also provide that... to the user continuing to meet the financial obligations for the right-of-way. The NITU will also...

  19. Streamlining and integrating right-of-way and utility processes with planning, environmental, and design processes in Australia and Canada.

    Science.gov (United States)

    2009-06-01

    Many transportation projects require acquisition of land and accommodation of utility facilities in the : right-of-way. The Federal Highway Administration, American Association of State Highway and : Transportation Officials, and National Cooperative...

  20. Removal Effectiveness of Co-mingling Off-site Flows with FDOT Right-of-Way Stormwater.

    Science.gov (United States)

    2017-09-22

    The Florida Department of Transportation (FDOT) manages runoff with best management practices (BMPs) in their right-of-way (onsite) to meet regulatory requirements for removal of nitrogen and phosphorus. In some situations, runoff water from outside ...

  1. Effects of morpho dynamics in shallow waters over pipeline facilities; Efeitos da morfodinamica em aguas rasas sobre instalacoes de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Toldo Junior, Elirio E.; Gruber, Nelson L.S.; Zouain, Ricardo N. Ayup [Universidade Federal do Rio Grande do Sul, Porto Alegre, RS (Brazil). Inst. de Quimica. Centro de Estudos de Geologia Costeira e Oceanica; Almeida, Luiz E.S.B. [Universidade Federal do Rio Grande do Sul, Porto Alegre, RS (Brazil). Inst. de Pesquisas Hidraulicas

    2003-07-01

    The success in developing of the oil industry operating in offshore-onshore terminals, connected by pipelines with the facilities of the coastal zone, can be attributed partially to the beach morpho dynamic monitoring. This study represents a solution to the concerns of the technical operations in coastal zones because it minimizes the impact of the petroleum production and it assures the environmental protection associated to the risks of the pipelines breaking. This impact type results mainly of the vertical and horizontal displacements of the beach, from the coastal dunes to the shore face. The mobility of the profile is associated to the magnitude of the sedimentary processes, which reproduce naturally or not, in scale of time that can vary among few days, years or decades. For the monitoring and interpretation of the beach profile mobility the following methods are recommended: calculation of the closure depth with base in the wave data; bathymetric survey with sled; calculation of the equilibrium beach profile, and monitoring of the variations of the shoreline using satellite images, GPS or aerial photography. (author)

  2. Fees For Advertisements In The Right-Of-Ways Of Public Roads Incurred By A Given Bank Brand In Poland

    Directory of Open Access Journals (Sweden)

    Płuciennik Monika

    2015-12-01

    Full Text Available This article aims to present the diversity in the rates of fees for advertisements on selected bank buildings located in the right-of-way, as well as the manner of calculating them. The research covered fees, incurred by a selected bank brand, for advertisements placed on all outlets of the bank in the area of the entire country in terms of the location of the buildings, means of establishing fees, rate of the basic fee, as well as costs incurred by the bank for placing advertisements in the right-of-way according to the state at the end of 2014.

  3. Strategic plan to optimize the management of right-of-way parcel and utility information at FDOT : [research summary].

    Science.gov (United States)

    2013-05-01

    The Florida Department of Transportation (FDOT) manages more than 12,000 centerline-miles of highway that run through hundreds of jurisdictions. The right-of-way (ROW) that these roads are built on is a massive and complex resource in its own right a...

  4. 39 CFR 776.10 - Lease, easement, right-of-way, or disposal of property to non-federal parties.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Lease, easement, right-of-way, or disposal of property to non-federal parties. 776.10 Section 776.10 Postal Service UNITED STATES POSTAL SERVICE... parties, the Postal Service shall: (a) Reference in the conveyance document that the parcel contains...

  5. 39 CFR 776.7 - Lease, easement, right-of-way, or disposal of property to non-federal parties.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Lease, easement, right-of-way, or disposal of property to non-federal parties. 776.7 Section 776.7 Postal Service UNITED STATES POSTAL SERVICE... Postal Service shall: (a) Reference in the conveyance document that the parcel is located in a floodplain...

  6. Economic impact of ecosystem services provided by ecologically sustainable roadside right of way vegetation management practices : [summary].

    Science.gov (United States)

    2014-03-01

    The Florida Department of Transportation (FDOT) : has approximately 186,121 acres of right-of-way : (ROW) for roads in the State Highway System : (SHS), about half of which are vegetated. As in : many states, turfgrass is often used to stabilize : so...

  7. 77 FR 52353 - Right-of-Way Grant of Submerged Lands on the Outer Continental Shelf to Support Renewable Energy...

    Science.gov (United States)

    2012-08-29

    ... of Submerged Lands on the Outer Continental Shelf to Support Renewable Energy Development AGENCY... would be used to issue Outer Continental Shelf (OCS) renewable energy right-of-way (ROW) grants in order... renewable energy, but does not constitute a project easement. The ability of an ROW grantee to install such...

  8. 78 FR 47748 - Right-of-Way Grant of Submerged Lands on the Outer Continental Shelf to Support Renewable Energy...

    Science.gov (United States)

    2013-08-06

    ...-Way Grant of Submerged Lands on the Outer Continental Shelf to Support Renewable Energy Development... will use Form 0009 to issue a renewable energy right-of- way (ROW) grant on the Outer Continental Shelf....gov/Renewable-Energy Program/ Regulatory-Information/Index.aspx. DATES: The ROW grant form will be...

  9. Decision support for mitigating the risk of tree induced transmission line failure in utility rights-of-way.

    Science.gov (United States)

    Poulos, H M; Camp, A E

    2010-02-01

    Vegetation management is a critical component of rights-of-way (ROW) maintenance for preventing electrical outages and safety hazards resulting from tree contact with conductors during storms. Northeast Utility's (NU) transmission lines are a critical element of the nation's power grid; NU is therefore under scrutiny from federal agencies charged with protecting the electrical transmission infrastructure of the United States. We developed a decision support system to focus right-of-way maintenance and minimize the potential for a tree fall episode that disables transmission capacity across the state of Connecticut. We used field data on tree characteristics to develop a system for identifying hazard trees (HTs) in the field using limited equipment to manage Connecticut power line ROW. Results from this study indicated that the tree height-to-diameter ratio, total tree height, and live crown ratio were the key characteristics that differentiated potential risk trees (danger trees) from trees with a high probability of tree fall (HTs). Products from this research can be transferred to adaptive right-of-way management, and the methods we used have great potential for future application to other regions of the United States and elsewhere where tree failure can disrupt electrical power.

  10. Induced AC voltages on pipelines may present a serious hazard

    International Nuclear Information System (INIS)

    Kirkpatrick, E.L.

    1997-01-01

    The problem of induced AC voltages on pipelines has always been with us. Early pipeline construction consisted of bare steel or cast iron pipe, which was very well grounded. Bell and spigot, mechanical, or dresser-style joint couplings often were used, creating electrically discontinuous pipelines which are less susceptible to AC induction. Although induced AC affects any pipeline parallel to a high-voltage alternating current (HVAC) power line, the effects were not noticeable on bare pipelines. With the advent of welded steel pipelines, modern cathodic protection (CP) methods and materials, and the vastly improved quality of protective coatings, induced AC effects on pipelines have become a significant consideration on many pipeline rights-of-way. In the last two to three decades, one has been seeing much more joint occupancy of the same right-of-way by one or more pipelines and power lines. As the cost of right-of-way and the difficulty in acquisition, particularly in urban areas, have risen, the concept of joint occupancy rights-of-way has become more attractive to many utility companies. Federal and state regulations usually insist on joint-use right-of-way when a utility proposes crossing regulated or publicly owned lands, wherever there is an existing easement. Such joint use allows the induced AC phenomena to occur and may create electrical hazards and interference to pipeline facilities. Underground pipelines are especially susceptible if they are well-coated and electrically isolated for CP

  11. 76 FR 43341 - Notice of Availability of the Record of Decision for the West Butte Wind Power Right-of-Way...

    Science.gov (United States)

    2011-07-20

    ... LVRWH09H0600; HAG 10-0338] Notice of Availability of the Record of Decision for the West Butte Wind Power Right... INFORMATION CONTACT: Steve Storo, BLM West Butte Wind Power Right-of-Way Project Lead: telephone (541) 416... INFORMATION: The applicant, West Butte Wind Power, LLC, filed right-of-way (ROW) application OR-065784 to...

  12. Results of the radiological survey at Interstate 80, North Right of Way at Lodi Brook, Lodi, New Jersey (LJ077)

    International Nuclear Information System (INIS)

    Foley, R.D.; Floyd, L.M.

    1989-06-01

    Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally 232 Th, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and oil sampling for radionuclide analyses. The survey of this site, on the North Right of Way of Interstate 80 at Lodi Brook, Lodi, New Jersey (LJ077), was conducted during 1988. Results of the survey demonstrated radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions are typical of the type of material originating from the MCW site. 5 refs., 3 figs., 3 tabs

  13. 50 CFR 29.21-9 - Rights-of-way for pipelines for the transportation of oil, natural gas, synthetic liquid or...

    Science.gov (United States)

    2010-10-01

    ... consumers within the State or municipality. (ii) Where natural gas not subject to state regulatory or... Act of 1920, except such crude oil which is either exchanged in similar quantity for convenience or... is temporarily exported for convenience or increased efficiency of transportation across parts of an...

  14. 78 FR 48868 - Proposed Cercla Administrative Cost Recovery Settlement; MassDOT, MassDOT Route 1 Right-of-Way...

    Science.gov (United States)

    2013-08-12

    ... Settlement; MassDOT, MassDOT Route 1 Right-of-Way Site, Chelsea, MA AGENCY: Environmental Protection Agency... (``CERCLA''), 42 U.S.C. 9622(h)(1), concerning the MassDOT Route 1 Right-of-Way Site in Chelsea... (OES04-3), Boston, MA 02109-3912 (Telephone No. 617-918-1886) and should refer to: In re: MassDOT Route 1...

  15. Possibilities of Spatial Data to Determine the Extent of the Occupancy of the Right-of-Way by Large-Format Advertisements

    Directory of Open Access Journals (Sweden)

    Bieda Agnieszka

    2017-06-01

    Full Text Available Large-format advertisements are becoming a more and more common element of building facades, especially in city centers. Placing an object of this type is not without significance to the real property management. A large-format advertising billboard on the facade, on the one hand, is associated with the possibility of renting advertising space, on the other - it can lead to the occupancy of a right-of-way, which results in a necessity to pay appropriate fees, in the amount regulated by the Act on Public Roads. Placing an object such as a large-format advertising billboard in a right-of-way requires a permit of the manager of this road. However, if a billboard is located on the facade of a building, occupancy of the right-of-way is not always the case. If the boundary of the road parcel runs along the contour of the building, a billboard placed on the elevation will always occupy the right-of-way. However, property boundaries often run at a distance from the building. Such situations - desired by managers - result in a noticeable increase in demand for surveying opinions to determine what part of the right-of-way is occupied by a large-format advertisement. This article analyzes the cases of the right-of-way being occupied by large-format advertising placed on the facades of buildings in the city center. For selected objects, information was obtained from public records, National Cartographic Documentation Center database, and direct surveying was performed with various techniques. This allowed for an objective assessment of the possible use of available surveying methods and the acquired spatial data to determine the right-of-way occupied by large-format advertisements for purposes of real estate management.

  16. Solar Highway Program : from concept to reality : a guidebook for Departments of Transportation to develop solar photovoltaic systems in the highway right-of-way.

    Science.gov (United States)

    2016-11-01

    This guidebook is intended to provide an overview for state Departments of Transportation (DOTs) of the process for developing solar photovoltaic (PV) projects in the highway right-of-way. The goal is to help others navigate the process towards a suc...

  17. Pipeline corridors through wetlands

    International Nuclear Information System (INIS)

    Zimmerman, R.E.; Wilkey, P.L.; Isaacson, H.R.

    1992-01-01

    This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity

  18. Analysis of surveying and legal problems in granting right-of-way and expropriation for the purpose of locating technical infrastructure

    Science.gov (United States)

    Trembecka, Anna

    2016-06-01

    A condition which determines the location of technical infrastructure is an entrepreneur holding the right to use the property for construction purposes. Currently, there are parallel separate legal forms allowing the use of a real property for the purpose of locating transmission lines, i.e. transmission easement (right-of-way) established under the civil law and expropriation by limiting the rights to a property under the administrative law. The aim of the study is to compare these forms conferring the right to use real properties and to analyze the related surveying and legal problems occurring in practice. The research thesis of the article is ascertainment that the current legal provisions for establishing legal titles to a property in order to locate transmission lines need to be amended. The conducted study regarded legal conditions, extent of expropriation and granting right-of-way in the city of Krakow, as well as the problems associated with the ambiguous wording of the legal regulations. Part of the research was devoted to the form of rights to land in order to carry out similar projects in some European countries (France, Czech Republic, Germany, Sweden). The justification for the analysis of these issues is dictated by the scale of practical use of the aforementioned forms of rights to land in order to locate technical infrastructure. Over the period of 2011-2014, 651 agreements were concluded on granting transmission right-of-way for 967 cadastral parcels owned by the city of Krakow, and 105 expropriation decisions were issued, limiting the use of real properties in Krakow.

  19. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  20. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  1. Pipeline technology. Petroleum oil - long-distance pipelines. Pipelinetechnik. Mineraloelfernleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Krass, W; Kittel, A; Uhde, A

    1979-01-01

    All questions and concerns of pipeline technique are dealt with in detail. Some chapters can be applied for petroleum pipelines only or partly, for example the importance of petroleum pipelines, projecting, calculation, and operation. The sections of pipes and formings, laying, rights of way, and corrosion protection, accessories and remote effect technique, however, are of general interest, for example also for gas pipelines. In the chapter on working material, a very good summary of today's pipe working material including the thermomechanically treated steels is given. Besides methods of improving the toughness, the problems of the corrosion caused by strain cracking and the ways of avoiding it are pointed out. The pipe producing methods and, in the end of the chapter, the tests in the factory are explained. The section of laying deals with the laying methods being applied for years in pipeline construction, a big part referring to welding methods and tests. Active and passive corrosion protection are explained with all details. In addition to the solidity calculation presented with special regard to concerns of petroleum pipelines, theoretical fundaments and calculation methods for pressure are dealt with. Beside general questions of pumps, accessories, and drives, there is a section dealing with measurement and control techniques. Furthermore, remote effect and transmission techniques and news systems are explained in detail. Here, problems are referred to which are applicable not only to the operation of mineral oil pipelines. The book is completed by indications as to pipeline operation emphasizing general operation control, maintenance, repair methods and damage and their elimination. The last chapter contains a collection of the legal fundaments and the technical rules.

  2. Cost-Effective, Insitu Field Measurements for Determining the Water Retention Quantification onBehavior of Individual Right-of-Way Bioswales

    Science.gov (United States)

    Wang, S.; McGillis, W. R.; Hu, R.; Culligan, P. J.

    2017-12-01

    Green infrastructure (GI) interventions, such as right-of-way bioswales, are being implemented in many urban areas, including New York City, to help mitigate the negative impacts of stormwater runoff. To understand the storm water retention capacity of bioswales, hydrological models, at scales ranging from the tributary area of a single right-of-way bioswale to an entire watershed, are often invoked. The validation and calibration of these models is, however, currently hampered by lack of extensive field measurements that quantify bioswale stormwater retention behaviors for different storm sizes and bioswale configurations. To overcome this problem, three field methods to quantify the water retention capacity of individual bioswales were developed. The methods are potentially applicable to other applications concerned with quantifying flow regimes in urban area. Precise measurements with high time resolutions and low environmental impacts are desired for gauging the hydraulic performance of bioswales, and similar GI configurations. To satisfy these requirements, an in-field measurement method was developed which involved the deployment of acoustic water-level sensors to measure the upstream and downstream water levels of flow into and out of a bioswale located in the Bronx areas of New York City. The measurements were made during several individual storm events. To provide reference flow rates to enable accurate calibration of the acoustic water level measurements, two other conductometry-based methods, which made use of YSI sensors and injected calcium chloride solutions, were also developed and deployed simultaneously with the water level measurements. The suite of data gathered by these methods enabled the development of a relationship between stage-discharge and rainfall intensity, which was then used to obtain the upstream and downstream hydrographs for the individual bioswale for the different storm events. This presentation will describe in detail the

  3. Integrity management of Brazil-Bolivia gas pipeline to reduce risks due third party damage

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcellos, Carlos Renato Aragonez de; Monte, Oswaldo [PETROBRAS, Rio de Janeiro, RJ (Brazil); Colen, Eustaquio; Cunha, Roberto de Souza; Oliveira, Hudson Regis de [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Lima, Rogerio de Souza [RSL Consultoria Geoprojetos (Brazil); Schultz Neto, Walter [Milton Braga Assessoria Tecnica (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline has 2.600 kilometers from Rio Grande City in Bolivia to Canoas City, in the south of Brazil. The right-of-way crosses a lot of types of topography and areas subjected to various kinds of anthropological actions, like areas in class locations 3, locals under agricultural activities, forests and minerals explorations, and near constructions of highway and railway, industrial constructions, new pipelines in the same right-of -way, channels, dams, that requires special projects to avoid that the gas pipeline could be subject to strengths that were not consider in the original design. The aim of this paper is to present the jobs developed by TBG during seven years of gas pipeline operations, as public awareness program, procedures to design, construct and inspect specials constructions along and near the right-of -way, control of mineral and forest explorations, monitoring and controlling of excavations on the right-of-way to install new pipelines and optical cables, to reduce risks of gas pipeline damage due third party, as a component of TBG' Managing Integrity Gas Pipeline Program. (author)

  4. Worldwide natural gas pipeline situation. Sekai no tennen gas pipeline jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, T [Osaka Gas Co. Ltd., Osaka (Japan)

    1993-03-01

    Constructing natural gas pipelines in wide areas requires investments of a huge amount. Many countries are building natural gas supply infrastructures under public support as nations' basic policy of promoting use of natural gas. This paper describes the present conditions of building pipelines in Western Europe, the U.S.A., Korea and Taiwan. In Western Europe, transporting companies established in line with the national policy own trunk pipelines and storage facilities, and import and distribute natural gas. The U.S.A. has 2300 small and large pipeline companies bearing transportation business. Pipelines extend about 1.9 million kilometers in total, with trunk pipelines accounting for about 440,000 kilometers. The companies are given eminent domain for the right of way. Korea has a plan to build a pipeline network with a distance of 1600 kilometers in around 2000. Taiwan has completed trunk pipelines extending 330 kilometers in two years. In Japan, the industry is preparing draft plans for wide area pipeline construction. 5 figs., 1 tab.

  5. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2012-01-01

    Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst.......Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst....

  6. Bulletin 2005-12 : revised Alberta pipeline regulation issued

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-31

    A revised Pipeline Regulation has been issued and is currently available on the Alberta Energy and Utilities Board (EUB) website. Changes to the regulation reflect bothchanges in EUB regulatory policy and processes and technological improvements. Goals of the revision include improvements in overall pipeline performance, and the implementation of recommendations derived from the Public Safety and Sour Gas Committee concerning sour gas pipeline safety. The regulation was re-organized for greater clarity, and structured into 11 parts. Issues concerning the transition to the revised regulation were presented. The summary of notable administrative changes included clarifications of when a pipeline application is not required; when ABSA approval is required for steam lines; situations for which low-pressure natural gas lines must be licensed; and emergency response requirements. Technical clarifications include requirements for pipeline operations and maintenance manuals; composite materials; limitations on amounts of H{sub 2}S in polymeric pipe; pressure mismatches; approval for testing with gaseous media; venting of small volumes of raw gas; right-of-way surveillance; inspection of surface construction activities; annual corrosion evaluations; registering of pipelines and excavators in controlled areas with Alberta One-Call; ground disturbance training; restoration and signage maintenance on abandoned pipelines; sour service steel pipelines; unused pipelines and abandoned pipelines; and remediation of stub ends in operating pipelines.

  7. Living and working near pipelines : Landowner guide 2002

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The transportation of natural gas, oil and other commodities is effected by pipelines throughout most of the country. Safety in the vicinity of a pipeline is very important because damage to a pipeline could result in adverse conditions to public safety and/or the environment. Before digging, written approval must be obtained from the pipeline company. If a landowner is having difficulty negotiating an agreement with the pipeline company, they should call the National Energy Board. It is illegal to construct or excavate without authorization, and approval or denial of a request must be granted within 10 business days by the pipeline company. Three days are allowed to the pipeline company to locate its pipeline. A section dealing with pipeline right-of-way is included, as well as the safety zone and the restricted area. A 10-step checklist of safety tips assists the landowner in taking the appropriate measures in the vicinity of a pipeline. A brief overview of the responsibilities of the National Energy Board is provided, followed by a list of the main pipelines regulated by the National Energy Board. 2 figs

  8. Effect of oil-pipelines existed in HVTL corridor on the electric field distribution

    Energy Technology Data Exchange (ETDEWEB)

    Ismail, H.M. [College of Technological Studies, Kuwait (Kuwait). Dept. of Electrical Engineering

    2007-07-01

    The overhead transmission of large amounts of electricity over long distances requires high transmission voltages which can generate high electric fields that may have harmful effects on both human and animals. Therefore, corridors or right-of-way are left on both sides along the route of transmission lines. Overhead power transmission lines need strips of land to be designated as rights-of-way. These strips of land can also support other uses such as pipelines, railroads and highways. The primary purpose for minimizing the field effects of high voltage AC lines is to reduce the electric field at ground level. This study investigated the effects of oil-pipelines running parallel to the lines in the rights-of-way corridors on the electric fields generated from high voltage electrical networks in Kuwait. In order to examine the impact of certain design parameters on the electric field distribution near the ground surface, this study varied the oil pipelines diameter, the proximity of the pipeline from the transmission line center and the number of pipelines. The objective was to determine if the amount of land which is required as right-of-way can be reduced. This study also examined the effect of two parallel oil pipelines on the field distribution. Both pipelines were separated by a given distance and ran parallel to the transmission line conductors. The charge simulation method (CSM) was used to simulate and model both the conductors of the transmission lines and the oil-pipelines. Graphs for the electric field distribution profiles at the ground surface, at transmission line conductors' surfaces and at the surfaces of the oil pipelines were presented and evaluated for each scenario. 10 refs., 12 figs.

  9. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2013-01-01

    I artiklen undersøges det empiriske grundlag for Leader- ship Pipeline. Først beskrives Leadership Pipeline modellen om le- delsesbaner og skilleveje i opadgående transitioner mellem orga- nisatoriske ledelsesniveauer (Freedman, 1998; Charan, Drotter and Noel, 2001). Dernæst sættes fokus på det...... forholdet mellem kontinuitet- og diskontinuitet i ledel- seskompetencer på tværs af organisatoriske niveauer præsenteres og diskuteres. Afslutningsvis diskuteres begrænsningerne i en kompetencebaseret tilgang til Leadership Pipeline, og det foreslås, at succesfuld ledelse i ligeså høj grad afhænger af...

  10. Distributed fiber optic sensing enhances pipeline safety and security

    Energy Technology Data Exchange (ETDEWEB)

    Frings, Jochen; Walk, Tobias [ILF Consulting Engineers, Munich (Germany)

    2011-09-15

    Pipelines are efficient, highly reliable and safe means of transportation. However, despite intensive right of way surveillance by foot, car and out of the air, pipeline leaks and illegal tappings are a reality - sometimes with catastrophic results. These events show a gap in real-time monitoring caused by the highly distributed nature of pipelines. Parts of this gap now can be closed with distributed fiber optic sensing technology. Using various physical effects this technology is apt to detect temperature, strain, vibrations and sound with very good localization over spans up to 50 km with a single sensor cable. Various field tested applications like leakage detection, third party activity monitoring and intrusion detection or ground movement detection as well as integrity monitoring proof that distributed fiber optic sensing can enhance pipeline safety and security. (orig.)

  11. Software for pipeline integrity administration

    Energy Technology Data Exchange (ETDEWEB)

    Soula, Gerardo; Perona, Lucas Fernandez [Gie SA., Buenos Aires (Argentina); Martinich, Carlos [Refinaria do Norte S. A. (REFINOR), Tartagal, Provincia de Salta (Argentina)

    2009-07-01

    A Software for 'pipeline integrity management' was developed. It allows to deal with Geographical Information and a PODS database (Pipeline Open database Standard) simultaneously, in a simple and reliable way. The premises for the design were the following: didactic, geo referenced, multiple reference systems. Program skills: 1.PODS+GIS: the PODS database in which the software is based on is completely integrated with the GIS module. 2 Management of different kinds of information: it allows to manage information on facilities, repairs, interventions, physical inspections, geographical characteristics, compliance with regulations, training, offline events, operation measures, O and M information treatment and importing specific data and studies in a massive way. It also assures the integrity of the loaded information. 3 Right of way survey: it allows to verify the class location, ROW occupation, sensitive areas identification and to manage landowners. 4 Risk analysis: it is done in a qualitative way, depending on the entered data, allowing the user to identify the riskiest stretches of the system. Either results from risk analysis, data and consultations made about the database, can be exported to standard formats. (author)

  12. Existing right-of-way plats database.

    Science.gov (United States)

    2010-02-01

    The Maryland State Highway Administrations Office of Real Estate processes a high volume of plat information and research : requests on a daily basis. This is a lengthy process which is completed manually. The Office of Real Estate intends to impr...

  13. Factors related to external loads in buried pipelines; Consideracoes quanto as variaveis relacionadas ao carregamento externo em dutos enterrados

    Energy Technology Data Exchange (ETDEWEB)

    Provenzano, Carlos E.C.; Silva, Breno S.; Fernandes, Lincoln F.; Santos Junior, Sergio J.F. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Louzada, Carlos H.C.M.

    2005-07-01

    Work of heavy equipment or vehicles above existent right-of-ways, may cause undesired external overload at buried pipelines in operation. The effect of these loads shall be analyzed considering the deflections and stresses on the pipelines. The major variables, nominal diameter, thickness, material, soil parameters, operation pressure and external loads shall be related and verified according to the limits from original project. Cases when the external loads cause higher efforts, the traffic over the pipelines shall be restricted in order to avoid damages. In other cases, it may be adapted to any technical alternatives to modify the parameters in such a way to make possible work above the right-of-way, such as increase the machine support area, increase backfill covering, a reduction in the internal operation pressure in a short time, etc. This work presents the study on the parameters used to establish the maximum allowable external loads over buried pipelines in operation. (author)

  14. Structural reliability analysis applied to pipeline risk analysis

    Energy Technology Data Exchange (ETDEWEB)

    Gardiner, M. [GL Industrial Services, Loughborough (United Kingdom); Mendes, Renato F.; Donato, Guilherme V.P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Quantitative Risk Assessment (QRA) of pipelines requires two main components to be provided. These are models of the consequences that follow from some loss of containment incident, and models for the likelihood of such incidents occurring. This paper describes how PETROBRAS have used Structural Reliability Analysis for the second of these, to provide pipeline- and location-specific predictions of failure frequency for a number of pipeline assets. This paper presents an approach to estimating failure rates for liquid and gas pipelines, using Structural Reliability Analysis (SRA) to analyze the credible basic mechanisms of failure such as corrosion and mechanical damage. SRA is a probabilistic limit state method: for a given failure mechanism it quantifies the uncertainty in parameters to mathematical models of the load-resistance state of a structure and then evaluates the probability of load exceeding resistance. SRA can be used to benefit the pipeline risk management process by optimizing in-line inspection schedules, and as part of the design process for new construction in pipeline rights of way that already contain multiple lines. A case study is presented to show how the SRA approach has recently been used on PETROBRAS pipelines and the benefits obtained from it. (author)

  15. Public issues associated with planning a large diameter pipeline in a multi-use urban corridor

    Energy Technology Data Exchange (ETDEWEB)

    Buszynski, M. [SENES Consultants Ltd., Richmond Hill, ON (Canada)

    2004-07-01

    The demand for natural gas in a downtown area of Toronto is expected to increase significantly due to the proposed construction of two new generation stations. However, there are few opportunities to locate the pipelines in large urban centers because of the lack of foresight by municipalities and others in preserving corridors for utilities. Enbridge Gas conducted a system planning study to determine the best methods for overcoming public issues that were encountered while planning the route for a NPS 36 inch diameter natural gas pipeline in this urban region. In Ontario, distribution pipelines are regulated by the Ontario Energy Board, whose environmental guidelines for the location, construction and operation of hydrocarbon pipelines require the identification of indirectly affected landowners and detailed analysis of public issues and how they can be resolved. Issues include noise, vibration, dust and traffic. Secondary use of the electric transmission rights-of-way resulted in the identification of several other issues, including aesthetics of the right-of-way and loss of privacy for adjacent residential properties. It was determined that the optimal solution was to parallel a section of existing NPS 30 pipeline running in a north-south right-of-way located east of the Don Valley Parkway. The techniques used to address public issues identified 180 directly affected and 3,200 indirectly affected landowners. The Enbridge study revealed that it is possible to plan a right-of-way through an urban corridor in a manner that is compatible with existing development and that satisfies the general public. 6 figs.

  16. Removable pipeline plug

    International Nuclear Information System (INIS)

    Vassalotti, M.; Anastasi, F.

    1984-01-01

    A removable plugging device for a pipeline, and particularly for pressure testing a steam pipeline in a boiling water reactor, wherein an inflatable annular sealing member seals off the pipeline and characterized by radially movable shoes for holding the plug in place, each shoe being pivotally mounted for self-adjusting engagement with even an out-of-round pipeline interior

  17. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  18. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  19. Pipeline oil fire detection with MODIS active fire products

    Science.gov (United States)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  20. Electromagnetic fields originated by transmission power lines and the electromagnetic compatibility in shared rights of way; Campos electromagneticos producidos por lineas de transmision y la compatibilidad electromagnetica en derechos de via compartidos

    Energy Technology Data Exchange (ETDEWEB)

    Perez Rebolledo, Hugo; Zavala Silva, Moises; Galvan Diego, Arturo [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1999-12-31

    This article describes the different types of electromagnetic interference by power lines in rights of way areas. The calculations of the electromagnetic fields obtained under a power line with the purpose of establishing acceptable interference limits, are shown. These calculations were conducted for different transmission power lines configurations. A good correlation was obtained among the measured magnetic fields and the calculated one under a power transmission line. For cases of fault currents to ground the ground potentials were estimated in order to obtain the minimum distance where buried pipes can be installed to operate in a safe way. [Espanol] Este articulo describe los diferentes tipos de interferencia electromagnetica producida por lineas de potencia en derechos de via. Se muestran los calculos de los campos electromagneticos obtenidos bajo una linea de potencia, con la intencion de establecer los limites aceptables de interferencia. Estos calculos se efectuaron para diferentes configuraciones de lineas de transmision. Se obtuvo una buena correlacion entre los campos magneticos medidos y el calculado bajo una linea de transmision. Para casos de corriente de falla a tierra se determinaron los potenciales a tierra, a fin de obtener la distancia minima en donde se pueden instalar las tuberias enterradas para operar de manera segura.

  1. Electromagnetic fields originated by transmission power lines and the electromagnetic compatibility in shared rights of way; Campos electromagneticos producidos por lineas de transmision y la compatibilidad electromagnetica en derechos de via compartidos

    Energy Technology Data Exchange (ETDEWEB)

    Perez Rebolledo, Hugo; Zavala Silva, Moises; Galvan Diego, Arturo [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    This article describes the different types of electromagnetic interference by power lines in rights of way areas. The calculations of the electromagnetic fields obtained under a power line with the purpose of establishing acceptable interference limits, are shown. These calculations were conducted for different transmission power lines configurations. A good correlation was obtained among the measured magnetic fields and the calculated one under a power transmission line. For cases of fault currents to ground the ground potentials were estimated in order to obtain the minimum distance where buried pipes can be installed to operate in a safe way. [Espanol] Este articulo describe los diferentes tipos de interferencia electromagnetica producida por lineas de potencia en derechos de via. Se muestran los calculos de los campos electromagneticos obtenidos bajo una linea de potencia, con la intencion de establecer los limites aceptables de interferencia. Estos calculos se efectuaron para diferentes configuraciones de lineas de transmision. Se obtuvo una buena correlacion entre los campos magneticos medidos y el calculado bajo una linea de transmision. Para casos de corriente de falla a tierra se determinaron los potenciales a tierra, a fin de obtener la distancia minima en donde se pueden instalar las tuberias enterradas para operar de manera segura.

  2. Applications of API RP 1102 in stress analysis of buried pipelines at automated cultivation land; Avaliacao de tensoes em dutos enterrados, em area de cultura mecanizada, a luz da norma API RP 1102

    Energy Technology Data Exchange (ETDEWEB)

    Spagnolo, Rodrigo Alves; Castro, Newton Camelo de [PETROBRAS Transportes S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    According to the development of the agriculture business in the Midwest of Brazil, it can be noted that the cultivated land has imposed to the right of way pipeline weight and quantity increasing of vehicles moving above TRANSPETRO pipelines. This paper has the objective promoting discussions about this theme, presenting preceding conclusions when analyzing pipeline stresses, when the pipeline equipment are submitted to great loadings of agricultural machines. In order to execute this analysis, analytical formulations were used to compute static and dynamic loadings. These evaluations were referenced from API RP 1102 american norm. Many loading simulations, with different operating and environment configurations to the buried installations, were realized. These data were applied having the purpose of diagnosing typical situations existing in automated cultivated land crossings, related to OSBRA (Oleoduto Sao Paulo - Brasilia) right of way pipeline. (author)

  3. Pipeline corridors through wetlands - impacts on plant communities: Bayou Pointe Aux Chenes, Terrebonne Parish, Louisiana. Topical report, August 1991--April 1994

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D.; Shem, L.M.; Zimmerman, R.E.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and night- of-way management practices. This report presents the results of a survey conducted on August 22, 1991, in an emergent intertidal estuarine wetland in Terrebonne Parish, Louisiana. The site includes three pipelines installed between 1958 and 1969. Vegetation within the site comprises three native tidal marsh grasses: Spartina alterniflora, Spartina patens, and Distichlis spicata. All three species occurred over the pipelines, within the right-of-way and in both natural areas. Vegetative differences attributable to the installation or presence of the pipelines were not obvious over the pipelines or in the habitat east of the pipelines. However, because of the presence of a canal west of the 1969 pipeline, vegetation was less abundant in that area, and D. spicata was absent from all but the most distant plots of the transacts. Data obtained in the study indicate that when rights-of-way through brackish marsh are restored to their original elevations, they are revegetated with native vegetation similar to that in surrounding areas.

  4. Parcels and Land Ownership, Contains parcels, subdivisions, CSMs, Condominiums, Rights of Way and supporting annotation. Data within the City of West Bend are maintained by the City. Some areas are mapped at 1:1200, Published in 2013, 1:2400 (1in=200ft) scale, Washington County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Parcels and Land Ownership dataset current as of 2013. Contains parcels, subdivisions, CSMs, Condominiums, Rights of Way and supporting annotation. Data within the...

  5. Overview of interstate hydrogen pipeline systems

    International Nuclear Information System (INIS)

    Gillette, J.L.; Kolpa, R.L.

    2008-01-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  6. Overview of interstate hydrogen pipeline systems.

    Energy Technology Data Exchange (ETDEWEB)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  7. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  8. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  9. Pipeline corridors through wetlands -- Impacts on plant communities: Norris Brook Crossing Peabody, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted August 17--19, 1992, at the Norris Brook crossing in the town of Peabody, Essex County, Massachusetts. The pipeline at this site was installed during September and October 1990. A backhoe was used to install the pipeline. The pipe was assembled on the adjacent upland and slid into the trench, after which the backhoe was used again to fill the trench and cover the pipeline. Within two years after pipeline construction, a dense vegetative community, composed predominantly of native perennial species, had become established on the ROW. Compared with adjacent natural areas undisturbed by pipeline installation, there was an increase in purple loosestrife and cattail within the ROW, while large woody species were excluded from the ROW. As a result of the ROW`s presence, habitat diversity, edge-type habitat, and species diversity increased within the site. Crooked-stem aster, Aster prenanthoides (a species on the Massasschusetts list of plants of special concern), occurred in low numbers in the adjacent natural areas and had reinvaded the ROW in low numbers.

  10. Pipelines 'R' us

    International Nuclear Information System (INIS)

    Thomas, P.

    1997-01-01

    The geopolitical background to the export of oil and gas from Kazakhstan by pipeline is explored with particular reference to the sensitivities of the USA. There are now a number of pipeline proposals which would enable Kazakhstan to get its hydrocarbons to world markets. The construction of two of these formed part of a major oil deal signed recently with China in the face of stiff competition from major US companies. The most convenient and cost effective route, connecting up with Iran's existing pipeline network to the Gulf, is unlikely to be developed given continuing US sanctions against Iran. Equally unlikely seems to be the Turkmenistan to Pakistan pipeline in the light of the political volatility of Afghanistan. US companies continue to face limits on export capacity via the existing Russian pipelines from Kazakhstan. A temporary solution could be to carry some oil in the existing pipeline from Azerbaijan to Georgia which has been upgraded and is due to become operational soon, and later in a second proposed pipeline on this route. The Caspian Pipeline Consortium, consisting of three countries and eleven international companies, is building a 1500 km pipeline from the Tergiz field to Novorossiysk on the Black Sea with a view to completion in 2000. An undersea pipeline crossing the Caspian from Azerbaijan is being promoted by Turkey. There is an international perception that within the next five years Kazakhstan could be in a position to export its oil via as many as half a dozen different routes. (UK)

  11. Decontamination device for pipeline

    International Nuclear Information System (INIS)

    Harashina, Heihachi.

    1994-01-01

    Pipelines to be decontaminated are parts of pipelines contaminated with radioactive materials, and they are connected to a fluid transfer means (for example, a bladeless pump) and a ball collector by way of a connector. The fluid of a mixture of chemical decontaminating liquid and spheres is sent into pipelines to be decontaminated. The spheres are, for example, heat resistant porous hard or soft rubber spheres. The fluid discharged from the pipelines to be decontaminated are circulated by way of bypassing means. The inner surface of the pipelines is decontaminated by the circulation of the fluid. When the bypass means is closed, the fluid discharged from the pipelines to be decontaminated is sent to the ball collector, and the spheres are captured by a hopper. Further, the liquid is sent to the filtrating means to filter the chemical contaminating liquid, and sludges contained in the liquid are captured. (I.N.)

  12. Overview of slurry pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gandhi, R L

    1982-01-01

    Slurry pipelines have proven to be a technically feasible, environmentally attractive and economic method of transporting finely divided particles over long distances. A pipeline system normally consists of preparation, pipeline and utilization facilities and requires optimization of all three components taken together. A considerable amount of research work has been done to develop hydraulic design of a slurry pipeline. Equipment selection and estimation of corrosion-erosion are considered to be as important as the hydraulic design. Future applications are expected to be for the large-scale transport of coal and for the exploitation of remotely located mineral deposits such as iron ore and copper. Application of slurry pipelines for the exploitation of remotely located mineral deposits is illustrated by the Kudremukh iron concentrate slurry pipeline in India.

  13. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  14. Pipeline maintenance, evaluation and inspection in water crossing: OSBRA case in Paranaiba River; Inspecao, avaliacao e manutencao de oleoduto em travessia: caso OSBRA (Oleoduto Sao Paulo-Brasilia) no Rio Paranaiba

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Newton Camelo de; Spagnolo, Rodrigo Alves; Vieira Paulo de Tarso [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Attempting to pipeline integrity proceeding of PETROBRAS, the OSBRA (Sao Paulo-Brasilia Pipeline) Management promoted field inspections by divers at Paranaiba River water crossing, located at your right-of-way pipeline. These services were composed by topography, visual inspections and local screened of the pipeline, determining the equipment layout at that water crossing. At Paranaiba River, the pipeline is seated above the river bed. The results indicated high spans in the pipeline structure. Considering this configuration, were made water speed and vibration measurements near the equipment. The activities were executed in order to assist the structural analysis of the pipeline. These studies had concluded to a temporary solution, which consisted in reducing loads and building additional supports. (author)

  15. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  16. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  17. Slurry pipeline design approach

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy; Navarro R, Luis [Brass Chile S.A., Santiago (Chile)

    2009-12-19

    Compared to other engineering technologies, the design of a commercial long distance Slurry Pipeline design is a relatively new engineering concept which gained more recognition in the mid 1960 's. Slurry pipeline was first introduced to reduce cost in transporting coal to power generating units. Since then this technology has caught-up worldwide to transport other minerals such as limestone, copper, zinc and iron. In South America, the use of pipeline is commonly practiced in the transport of Copper (Chile, Peru and Argentina), Iron (Chile and Brazil), Zinc (Peru) and Bauxite (Brazil). As more mining operations expand and new mine facilities are opened, the design of the long distance slurry pipeline will continuously present a commercially viable option. The intent of this paper is to present the design process and discuss any new techniques and approach used today to ensure a better, safer and economical slurry pipeline. (author)

  18. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  19. Alternate current interference in pipeline; Interferencia por corrente alternada em dutos

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, Joao Hipolito de Lima [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper regards to the concerning that the pipeline operators should take in to account to better understand and control the alternate current interference (AC- interference). Pipelines sharing rights-of-way with AC high voltage power lines are subjected to AC interference that can cause risk for personnel, operational safety and environment. The AC-interference shall be evaluated, in such way that mitigating action can be applied in order to assure the pipeline is operated in a safety way. The AC-interference evaluation should take in to account the pipeline and the electrical generation/transmission design data. Three approaches are considered: the coating integrity, the personnel chock hazards and the pipeline integrity. The coating integrity is affected by the possibility of high-voltage be induced on the pipeline during power line current fault. The operation and maintenance personnel can be prone to chock hazards (touch voltage and step voltage), depending upon the level of the induced voltage on the pipeline and the ground current. An induced voltage evaluation is then necessary to identify AC potentials in pipeline higher than the safe criteria. The pipeline integrity is concerning to the possibility of occurring alternate current corrosion (AC-corrosion) on the pipe wall. This kind of corrosion is still been investigated, and although it is less critical than the direct current corrosion, it can happen in specific situation. Parameters that affect AC-corrosion are discussed in this paper. Finely it is presented a brief guide to evaluate the possibility of occurring AC- interference in a pipeline and a mitigation measures summary. (author)

  20. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  1. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  2. Pipeline Drag Reducers

    International Nuclear Information System (INIS)

    Marawan, H.

    2004-01-01

    Pipeline drag reducers have proven to be an extremely powerful tool in fluid transportation. High molecular weight polymers are used to reduce the frictional pressure loss ratio in crude oil pipelines, refined fuel and aqueous pipelines. Chemical structure of the main used pipeline drag reducers is one of the following polymers and copolymers classified according to the type of fluid to ; low density polyethylene, copolymer of I-hexane cross linked with divinyl benzene, polyacrylamide, polyalkylene oxide polymers and their copolymers, fluorocarbons, polyalkyl methacrylates and terpolymer of styrene, alkyl acrylate and acrylic acid. Drag reduction is the increase in pump ability of a fluid caused by the addition of small amounts of an additive to the fluid. The effectiveness of a drag reducer is normally expressed in terms of percent drag reduction. Frictional pressure loss in a pipeline system is a waste of energy and it costly. The drag reducing additive minimizes the flow turbulence, increases throughput and reduces the energy costs. The Flow can be increased by more than 80 % with existing assets. The effectiveness of the injected drag reducer in Mostorod to Tanta crude oil pipeline achieved 35.4 % drag reduction and 23.2 % flow increase of the actual performance The experimental application of DRA on Arab Petroleum Pipeline Company (Summed) achieved a flow increase ranging from 9-32 %

  3. Pollution from pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    During the 1980s, over 3,900 spills from land-based pipelines released nearly 20 million gallons of oil into U.S. waters-almost twice as much as was released by the March 1989 Exxon Valdez oil spill. Although the Department of Transportation is responsible for preventing water pollution from petroleum pipelines, GAO found that it has not established a program to prevent such pollution. DOT has instead delegated this responsibility to the Coast Guard, which has a program to stop water pollution from ships, but not from pipelines. This paper reports that, in the absence of any federal program to prevent water pollution from pipelines, both the Coast Guard and the Environmental Protection Agency have taken steps to plan for and respond to oil spills, including those from pipelines, as required by the Clean Water Act. The Coast Guard cannot, however, adequately plan for or ensure a timely response to pipeline spills because it generally is unaware of specific locations and operators of pipelines

  4. High temperature pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Greenslade, J.G. [Colt Engineering, Calgary, AB (Canada). Pipelines Dept.; Nixon, J.F. [Nixon Geotech Ltd., Calgary, AB (Canada); Dyck, D.W. [Stress Tech Engineering Inc., Calgary, AB (Canada)

    2004-07-01

    It is impractical to transport bitumen and heavy oil by pipelines at ambient temperature unless diluents are added to reduce the viscosity. A diluted bitumen pipeline is commonly referred to as a dilbit pipeline. The diluent routinely used is natural gas condensate. Since natural gas condensate is limited in supply, it must be recovered and reused at high cost. This paper presented an alternative to the use of diluent to reduce the viscosity of heavy oil or bitumen. The following two basic design issues for a hot bitumen (hotbit) pipeline were presented: (1) modelling the restart problem, and, (2) establishing the maximum practical operating temperature. The transient behaviour during restart of a high temperature pipeline carrying viscous fluids was modelled using the concept of flow capacity. Although the design conditions were hypothetical, they could be encountered in the Athabasca oilsands. It was shown that environmental disturbances occur when the fluid is cooled during shut down because the ground temperature near the pipeline rises. This can change growing conditions, even near deeply buried insulated pipelines. Axial thermal loads also constrain the design and operation of a buried pipeline as higher operating temperatures are considered. As such, strain based design provides the opportunity to design for higher operating temperature than allowable stress based design methods. Expansion loops can partially relieve the thermal stress at a given temperature. As the design temperature increase, there is a point at which above grade pipelines become attractive options, although the materials and welding procedures must be suitable for low temperature service. 3 refs., 1 tab., 10 figs.

  5. Trouble in the pipeline?

    Energy Technology Data Exchange (ETDEWEB)

    Snieckus, Darius

    2002-10-01

    The author provides a commentary on the political, economic, environmental and social problems facing the proposed 3 billion US dollars Baku-Ceyhan-Tbilisi export pipeline. The 1760 km long pipeline has been designed to carry 1 million b/d of crude oil from the Caspian Sea to Turkey's Mediterranean coast. The pipeline is being constructed by a BP-led consortium made up of Socar, Statoil, Unocal, TPAO, Eni, Itochu, Amerada Hess, TotalFinaElf and BP. (UK)

  6. Environmental management systems methodology for pipeline systems implementation; Metodologia para implantacao de sistemas de gestao ambiental na implementacao de empreendimentos dutoviarios

    Energy Technology Data Exchange (ETDEWEB)

    Paz, Claudio Marques [JPTE Engenharia Ltda., Barueri, SP (Brazil); Pinaud, Rodrigo Zambrotti [AJR Engenharia - Seguranca, Meio Ambiente e Saude Ltda. (Brazil)

    2004-07-01

    The implementation of oil and gas pipeline systems are commonly made in a own or shared with power transmission, rail and crossroads right-of-way. Pipelines are a 'linear' structure, such as power transmission lines, which are established on landscapes with several conformations (accent slopes, swamp and rocky soils), including sites with high environmental sensibility. The services involved on pipeline implementation are very dynamic, involving several number of employees, vehicles, heavy equipment of excavation and welding that results in a high potential to cause environmental and social impacts. This article, based on the Brazilian and foreign experience on pipeline construction, proposes a methodology to prevent and minimize social and environmental impacts during the construction stage of a pipeline system. (author)

  7. Pipeline integrity management: integration of geotechnical and mechanical assessment to control potential risks due to external forces

    Energy Technology Data Exchange (ETDEWEB)

    Malpartida Moya, John E.; Sota, Giancarlo Massucco de la; Seri, Walter [Compania Operadora de Gas del Amazonas, Lima (Peru)

    2009-07-01

    Every pipeline integrity management system evaluates and controls various threats. On pipelines which have particular characteristics as it is the case of the Andean pipelines and pipelines crossing jungles, one of the main threats are the external forces. Even, this threat causes a greater number of failures than other threats like corrosion or the third part damage. Facing this situation, the pipeline integrity management system of TgP has achieved an important development in the use and suitable handling of the information provided by diverse techniques of pipeline mechanical inspection and geotechnical inspection of the right-of-way (ROW). This document presents our methodology, which interrelate information of the in-line inspection, information of geotechnical inspections of the ROW, instrumentation (Strain Gages), topographic monitoring, among others. All this information is supported in a Geographic Information System (GIS) which allows us to integrate the information. By means of the pipeline integrity management system we control potential risks due to external forces, we have been able to act before events become critical, with no occurrence of failures. This system allows us simultaneously to optimize efforts and preserve the mechanical integrity of our pipelines, not producing neither personal nor environmental nor economical affectation. (author)

  8. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  9. National Pipeline Mapping System

    Data.gov (United States)

    Department of Transportation — The NPMS Public Map Viewer allows the general public to view maps of transmission pipelines, LNG plants, and breakout tanks in one selected county. Distribution and...

  10. The Winfrith effluent pipeline

    International Nuclear Information System (INIS)

    Palmer, G.H.

    1959-11-01

    The paper describes the preparatory work leading up to the design of the Winfrith pipeline. Details of the existing system are given and some information on the predicted safe levels of radio-active discharge. (author)

  11. Pipelines in power plants

    International Nuclear Information System (INIS)

    Oude-Hengel, H.H.

    1978-01-01

    Since the end of the Sixties, steam-transporting pipelines are given great attention, as pipeline components often fail, partially even long before their designed operation time is over. Thus, experts must increasingly deal with questions of pipelines and their components. Design and calculation, production and operation of pipelines are included in the discussion. Within the frame of this discussion, planners, producers, operators, and technical surveillance personnel must be able to offer a homogenous 'plan for assuring the quality of pipelines' in fossil and nuclear power plants. This book tries to make a contribution to this topic. 'Quality assuring' means efforts made for meeting the demands of quality (reliability). The book does not intend to complete with well-known manuals, as for as a complete covering of the topic is concerned. A substantial part of its sections serves to show how quality assurance of pipelines can be at least partially obtained by surveillance measures beginning with the planning, covering the production, and finally accompanying the operation. There is hardly need to mention that the sort of planning, production, and operation has an important influence on the quality. This is why another part of the sections contain process aspects from the view of the planners, producers, and operators. (orig.) [de

  12. Pipelines to eastern Canada

    International Nuclear Information System (INIS)

    Otsason, J.

    1998-01-01

    This presentation focused on four main topics: (1) the existing path of pipelines to eastern Canada, (2) the Chicago hub, (3) transport alternatives, and (4) the Vector Pipeline' expansion plans. In the eastern Canadian market, TransCanada Pipelines dominates 96 per cent of the market share and is effectively immune to expansion costs. Issues regarding the attractiveness of the Chicago hub were addressed. One attractive feature is that the Chicago hub has access to multiple supply basins including western Canada, the Gulf Coast, the mid-continent, and the Rockies. Regarding Vector Pipelines' future plans, the company proposes to construct 343 miles of pipeline from Joliet, Illinois to Dawn, Ontario. Project description included discussion of some of the perceived advantages of this route, namely, extensive storage in Michigan and south-western Ontario, the fact that the proposed pipeline traverses major markets which would mitigate excess capacity concerns, arbitrage opportunities, cost effective expansion capability reducing tolls, and likely lower landed costs in Ontario. Project schedule, costs, rates and tariffs are also discussed. tabs., figs

  13. Security of pipeline facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.C. [Alberta Energy and Utilities Board, Calgary, AB (Canada); Van Egmond, C.; Duquette, L. [National Energy Board, Calgary, AB (Canada); Revie, W. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada)

    2005-07-01

    This working group provided an update on provincial, federal and industry directions regarding the security of pipeline facilities. The decision to include security issues in the NEB Act was discussed as well as the Pipeline Security Management Assessment Project, which was created to establish a better understanding of existing security management programs as well as to assist the NEB in the development and implementation of security management regulations and initiatives. Amendments to the NEB were also discussed. Areas of pipeline security management assessment include physical safety management; cyber and information security management; and personnel security. Security management regulations were discussed, as well as implementation policies. Details of the Enbridge Liquids Pipelines Security Plan were examined. It was noted that the plan incorporates flexibility for operations and is integrated with Emergency Response and Crisis Management. Asset characterization and vulnerability assessments were discussed, as well as security and terrorist threats. It was noted that corporate security threat assessment and auditing are based on threat information from the United States intelligence community. It was concluded that the oil and gas industry is a leader in security in North America. The Trans Alaska Pipeline Incident was discussed as a reminder of how costly accidents can be. Issues of concern for the future included geographic and climate issues. It was concluded that limited resources are an ongoing concern, and that the regulatory environment is becoming increasingly prescriptive. Other concerns included the threat of not taking international terrorism seriously, and open media reporting of vulnerability of critical assets, including maps. tabs., figs.

  14. LNG transport through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pfund, P; Philipps, A

    1975-01-01

    LNG pipelines could help solve some peakshaving problems if operated in conjunction with other facilities that could use the LNG cold recovered during regasification. In some areas at present, LNG is delivered by tanker and regasified near the terminal for transmission through conventional gas pipelines. In other places, utilities liquefy natural gas for easy storage for later peakshaving use. The only chance to avoid the second expensive liquefaction step would be to convey imported LNG through a suitable designed LNG pipeline. The technical problems involved in LNG pipeline construction have basically been solved in recent years, but those pipelines actually constructed have been only short ones. To be economically justified, long-distance LNG lines require additional credit, which could be obtained by selling the LNG cold recovered during regasification to industrial users located in or near the points of gas consumption. Technical details presented cover the pipe material, stress relief, steel composition, pressure enthalpy, bellows-type expansion joints, and mechanical and thermal insulation.

  15. Water level detection pipeline

    International Nuclear Information System (INIS)

    Koshikawa, Yukinobu; Imanishi, Masatoshi; Niizato, Masaru; Takagi, Masahiro

    1998-01-01

    In the present invention, water levels of a feedwater heater and a drain tank in a nuclear power plant are detected at high accuracy. Detection pipeline headers connected to the upper and lower portions of a feedwater heater or a drain tank are connected with each other. The connection line is branched at appropriate two positions and an upper detection pipeline and a lower detection pipeline are connected thereto, and a gauge entrance valve is disposed to each of the detection pipelines. A diaphragm of a pressure difference generator is connected to a flange formed to the end portion. When detecting the change of water level in the feedwater heater or the drain tank as a change of pressure difference, gauge entrance valves on the exit side of the upper and lower detection pipelines are connected by a connection pipe. The gauge entrance valve is closed, a tube is connected to the lower detection pipe to inject water to the diaphragm of the pressure difference generator passing through the connection pipe thereby enabling to calibrate the pressure difference generator. The accuracy of the calibration of instruments is improved and workability thereof upon flange maintenance is also improved. (I.S.)

  16. Pipelines. Economy's veins; Pipelines. Adern der Wirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Feizlmayr, Adolf; Goestl, Stefan [ILF Beratende Ingenieure, Muenchen (Germany)

    2011-02-15

    According to the existing prognoses more than 1 million km of gas pipelines, oil pipelines and water pipelines are built up to the year 2030. The predominant portion is from gas pipelines. The safe continued utilization of the aging pipelines is a large challenge. In addition, the diagnostic technology, the evaluation and risk assessment have to be developed further. With the design of new oil pipelines and gas pipelines, aspects of environmental protection, the energy efficiency of transport and thus the emission reduction of carbon dioxide, the public acceptance and the market strategy of the exporters gain in importance. With the offshore pipelines one soon will exceed the present border of 2,000 m depth of water and penetrate into larger sea depths.

  17. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Science.gov (United States)

    2012-06-08

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0100] Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines AGENCY: Office of Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION...

  18. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under...

  19. Quantifying impact reduction due to avoidance, minimization and restoration for a natural gas pipeline in the Peruvian Andes

    International Nuclear Information System (INIS)

    Sahley, C.T.; Vildoso, B.; Casaretto, C.; Taborga, P.; Ledesma, K.; Linares-Palomino, R.; Mamani, G.; Dallmeier, F.; Alonso, A.

    2017-01-01

    We present monitoring methods and quantitative biodiversity data to document components of the mitigation hierarchy. We estimated avoidance, minimization, restoration and impact reduction in quality hectares for the 25 m wide right of way of a 408 km natural gas buried pipeline that crosses 14 Ecological Landscape Units (ELUs) in the tropical Andes of Peru. We found that applying the mitigation hierarchy as part of a comprehensive biodiversity action plan substantially reduced impacts on biodiversity in all habitats studied. Avoidance and right of way minimization contributed to significant impact reduction. We quantified impact reduction during construction and operation on the right of way of the pipeline over a five-year period and found that restoration was the greatest contributor to reducing impacts. We documented that most ELUs have a positive restoration trajectory. We also documented how monitoring over large scale spatial scales, in combination with site-specific monitoring, generated data for management to determine restoration priorities and impact mitigation. A biodiversity action plan that incorporated the mitigation hierarchy and a science-based biodiversity monitoring and assessment program contributed to biodiversity management of the project and played an important role in minimizing and managing impacts. - Highlights: •Quantitative data for mitigation hierarchy components are presented. •Application of the mitigation hierarchy reduced impacts on biodiversity. •A biodiversity monitoring program provided data to reduce impacts.

  20. Pipeline rehabilitation planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil; Eyre, David [PENSPEN (United Kingdom)

    2005-07-01

    An operator faced with an onshore pipeline that has extensive damage must consider the need for rehabilitation, the sort of rehabilitation to be used, and the rehabilitation schedule. This paper will consider pipeline rehabilitation based on the authors' experiences from recent projects, and recommend a simple strategy for planning pipeline rehabilitation. It will also consider rehabilitation options: external re-coating; internal lining; internal painting; programmed repairs. The main focus will be external re-coating. Consideration will be given to rehabilitation coating types, including tape wraps, epoxy, and polyurethane. Finally it will discuss different options for scheduling the rehabilitation of corrosion damage including: the statistical comparison of signals from inspection pigs; statistical comparison of selected measurements from inspection pigs and other inspections; the use of corrosion rates estimated for the mechanisms and conditions; expert judgement. (author)

  1. Beyond the pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Barnsley, J.; Ellis, D.; McIntosh, J.

    1979-12-01

    A study was conducted on the lives of women and their families in Fort Nelson, British Columbia, and Whitehorse, Yukon Territory, two communities which are to be affected by the proposed construction of the Alaska Highway gas pipeline. The womens' socio-economic concerns resulting from the proposed construction were examined by means of interviews with samples of women living in the two communities. Results from the study include descriptions of the communities and their basic services, community planning and housing, women's work in the home and for wages, and the perceived impact of the pipeline on such matters as employment, social services, living costs, business, housing, crime, and the overall community. Recommendations are made to improve the planning process for the pipeline to include the taking into account of womens' needs in such areas as training, health care, housing, and community services. 213 refs., 4 figs., 2 tabs.

  2. CPL: Common Pipeline Library

    Science.gov (United States)

    ESO CPL Development Team

    2014-02-01

    The Common Pipeline Library (CPL) is a set of ISO-C libraries that provide a comprehensive, efficient and robust software toolkit to create automated astronomical data reduction pipelines. Though initially developed as a standardized way to build VLT instrument pipelines, the CPL may be more generally applied to any similar application. The code also provides a variety of general purpose image- and signal-processing functions, making it an excellent framework for the creation of more generic data handling packages. The CPL handles low-level data types (images, tables, matrices, strings, property lists, etc.) and medium-level data access methods (a simple data abstraction layer for FITS files). It also provides table organization and manipulation, keyword/value handling and management, and support for dynamic loading of recipe modules using programs such as EsoRex (ascl:1504.003).

  3. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  4. Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993

    International Nuclear Information System (INIS)

    Shem, L.M.; Zimmerman, R.E.; Alsum, S.K.; Van Dyke, G.D.; Trinity Christian Coll., Palos Heights, IL

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created by the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation

  5. Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Zimmerman, R.E.; Alsum, S.K. [Argonne National Lab., IL (United States). Center for Environmental Restoration Systems; Van Dyke, G.D. [Argonne National Lab., IL (United States). Center for Environmental Restoration Systems]|[Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created by the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation.

  6. Ecological effects of pipeline construction through deciduous forested wetlands, Midland County, Michigan

    International Nuclear Information System (INIS)

    Zellmer, S.D.; Rastorfer, J.R.; Van Dyke, G.D.

    1991-07-01

    Implementation of recent federal and state regulations promulgated to protect wetlands makes information on effects of gas pipeline rights-of-way (ROWs) in wetlands essential to the gas pipeline industry. This study is designed to record vegetational changes induced by the construction of a large-diameter gas pipeline through deciduous forested wetlands. Two second-growth forested wetland sites mapped as Lenawee soils, one mature and one subjected to recent selective logging, were selected in Midland County, Michigan. Changes in the adjacent forest and successional development on the ROW are being documented. Cover-class estimates are being made for understory and ROW plant species using 1 x1-m quadrats. Counts are also being made for all woody species with stems < 2 cm in diameter at breast height (dbh) in the same plots used for cover-class estimates. Individual stem diameters and species counts are being recorded for all woody understory and overstory plants with stems ≥2 cm dbh in 10 x 10-m plots. Although analyses of the data have not been completed, preliminary analyses indicate that some destruction of vegetation at the ROW forest edge may have been avoidable during pipeline construction. Rapid regrowth of many native wetland plant species on the ROW occurred because remnants of native vegetation and soil-bearing propagules of existing species survived on the ROW after pipeline construction and seeding operations. 91 refs., 11 figs., 3 tabs

  7. PE-3 - a high class pipeline; PE-3 - um oleoduto high-class

    Energy Technology Data Exchange (ETDEWEB)

    Hashiguchi, D Issao; Santos, J.A. Costa; Medeiros, A Roberto [GDK Engenharia, Salvador, BA (Brazil); Garcia, Amaury [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Santos, F Cesar [Superpesa Transportes Especiais e Intermodais, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Pipeline PE-3, with a length of approximately 17 Km mainly inside of Guanabara Bay, connects the refinery of Duque de Caxias to the terminal of the Ilha D'Agua. It is used to export dark products from the refinery. Product transfer, by operational necessity, is conducted at a temperature of 75 deg C. This introduces a considerable load of tension on the pipeline, in addition to creating a fatigue-inducing thermal cycle. Because of this, and unlike almost all other existing oil and gas pipelines, PE-3 posses a zig zag configuration, alternating a straight tube with a curve of 10 degrees. This stands out as an innovative concept. Their are only two other similar installations in the world, but in very different conditions, thus conferring a pioneering aspect on this pipeline. Due to its criticality, the pipeline is predicated on complete certification in its entirety, from design to operation and in adherence with the strictest requirements. The environmental conditions encountered along its right of way, and the constructive tolerances imposed by the project, obligate the adoption of constructive and technical solutions that are themselves innovative in the terrestrial and marine realms. The principal objective of this work is to present a general overview of the methodology employed in PE-3 construction, installation and assembly. (author)

  8. Ecological effects of pipeline construction through deciduous forested wetlands, Midland County, Michigan

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D. (Argonne National Lab., IL (United States)); Rastorfer, J.R. (Chicago State Univ., IL (United States). Dept. of Biological Sciences ANL/CSU Cooperative Herbarium, Chicago, IL (United States)); Van Dyke, G.D. (Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology)

    1991-07-01

    Implementation of recent federal and state regulations promulgated to protect wetlands makes information on effects of gas pipeline rights-of-way (ROWs) in wetlands essential to the gas pipeline industry. This study is designed to record vegetational changes induced by the construction of a large-diameter gas pipeline through deciduous forested wetlands. Two second-growth forested wetland sites mapped as Lenawee soils, one mature and one subjected to recent selective logging, were selected in Midland County, Michigan. Changes in the adjacent forest and successional development on the ROW are being documented. Cover-class estimates are being made for understory and ROW plant species using 1 {times}1-m quadrats. Counts are also being made for all woody species with stems < 2 cm in diameter at breast height (dbh) in the same plots used for cover-class estimates. Individual stem diameters and species counts are being recorded for all woody understory and overstory plants with stems {ge}2 cm dbh in 10 {times} 10-m plots. Although analyses of the data have not been completed, preliminary analyses indicate that some destruction of vegetation at the ROW forest edge may have been avoidable during pipeline construction. Rapid regrowth of many native wetland plant species on the ROW occurred because remnants of native vegetation and soil-bearing propagules of existing species survived on the ROW after pipeline construction and seeding operations. 91 refs., 11 figs., 3 tabs.

  9. A clustering based method to evaluate soil corrosivity for pipeline external integrity management

    International Nuclear Information System (INIS)

    Yajima, Ayako; Wang, Hui; Liang, Robert Y.; Castaneda, Homero

    2015-01-01

    One important category of transportation infrastructure is underground pipelines. Corrosion of these buried pipeline systems may cause pipeline failures with the attendant hazards of property loss and fatalities. Therefore, developing the capability to estimate the soil corrosivity is important for designing and preserving materials and for risk assessment. The deterioration rate of metal is highly influenced by the physicochemical characteristics of a material and the environment of its surroundings. In this study, the field data obtained from the southeast region of Mexico was examined using various data mining techniques to determine the usefulness of these techniques for clustering soil corrosivity level. Specifically, the soil was classified into different corrosivity level clusters by k-means and Gaussian mixture model (GMM). In terms of physical space, GMM shows better separability; therefore, the distributions of the material loss of the buried petroleum pipeline walls were estimated via the empirical density within GMM clusters. The soil corrosivity levels of the clusters were determined based on the medians of metal loss. The proposed clustering method was demonstrated to be capable of classifying the soil into different levels of corrosivity severity. - Highlights: • The clustering approach is applied to the data extracted from a real-life pipeline system. • Soil properties in the right-of-way are analyzed via clustering techniques to assess corrosivity. • GMM is selected as the preferred method for detecting the hidden pattern of in-situ data. • K–W test is performed for significant difference of corrosivity level between clusters

  10. PE-3 - a high class pipeline; PE-3 - um oleoduto high-class

    Energy Technology Data Exchange (ETDEWEB)

    Hashiguchi, D. Issao; Santos, J.A. Costa; Medeiros, A. Roberto [GDK Engenharia, Salvador, BA (Brazil); Garcia, Amaury [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Santos, F. Cesar [Superpesa Transportes Especiais e Intermodais, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Pipeline PE-3, with a length of approximately 17 Km mainly inside of Guanabara Bay, connects the refinery of Duque de Caxias to the terminal of the Ilha D'Agua. It is used to export dark products from the refinery. Product transfer, by operational necessity, is conducted at a temperature of 75 deg C. This introduces a considerable load of tension on the pipeline, in addition to creating a fatigue-inducing thermal cycle. Because of this, and unlike almost all other existing oil and gas pipelines, PE-3 posses a zig zag configuration, alternating a straight tube with a curve of 10 degrees. This stands out as an innovative concept. Their are only two other similar installations in the world, but in very different conditions, thus conferring a pioneering aspect on this pipeline. Due to its criticality, the pipeline is predicated on complete certification in its entirety, from design to operation and in adherence with the strictest requirements. The environmental conditions encountered along its right of way, and the constructive tolerances imposed by the project, obligate the adoption of constructive and technical solutions that are themselves innovative in the terrestrial and marine realms. The principal objective of this work is to present a general overview of the methodology employed in PE-3 construction, installation and assembly. (author)

  11. Visual operations management tools applied to the oil pipelines and terminals standardization process: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the process by which visual operations management (VOM) tools were implemented, concerning standards and operational procedures in TRANSPETRO's Oil Pipelines and Terminals Unit. It provides: a brief literature review of visual operations management tools applied to total quality management and the standardization processes; a discussion of the assumptions from the second level of VOM (visual standards) upon which TRANSPETRO's oil pipelines and terminals business processes and operational procedures are based; and a description of the VOM implementation process involving more than 100 employees and one illustrative example of 'Quick Guides' for right-of- way management activities. Finally, it discusses the potential impacts and benefits of using VOM tools in the current practices in TRANSPETRO's Oil Pipelines and Terminals Unit, reinforcing the importance of such visual guides as vital to implement regional and corporate procedures, focusing on the main operational processes. (author)

  12. Visual operations management tools applied to the oil pipelines and terminals standardization process: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the process by which visual operations management (VOM) tools were implemented, concerning standards and operational procedures in TRANSPETRO's Oil Pipelines and Terminals Unit. It provides: a brief literature review of visual operations management tools applied to total quality management and the standardization processes; a discussion of the assumptions from the second level of VOM (visual standards) upon which TRANSPETRO's oil pipelines and terminals business processes and operational procedures are based; and a description of the VOM implementation process involving more than 100 employees and one illustrative example of 'Quick Guides' for right-of- way management activities. Finally, it discusses the potential impacts and benefits of using VOM tools in the current practices in TRANSPETRO's Oil Pipelines and Terminals Unit, reinforcing the importance of such visual guides as vital to implement regional and corporate procedures, focusing on the main operational processes. (author)

  13. 36 CFR 254.33 - Road rights-of-way.

    Science.gov (United States)

    2010-07-01

    ... parcels subject to conveyance under this subpart are limited to those which are substantially surrounded by lands not owned by the United States. (b) Forest Service officials shall consider public road... Section 254.33 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE LANDOWNERSHIP...

  14. 23 CFR 645.111 - Right-of-way.

    Science.gov (United States)

    2010-04-01

    ... existing location beause it holds the fee, an easement, or another real property interest, the damaging or... for highway purposes. (b) The utility shall determine and make a written valuation of the replacement... valuation shall be accomplished prior to negotiation for acquisition. (c) Acquisition of replacement right...

  15. 2012 right-of-way fatality & trespass prevention workshop

    Science.gov (United States)

    2013-04-30

    Based on the success of the 2008 Trespasser Workshop, FRA and FTA sponsored this follow-on workshop. The keynote speech by FRA Administrator, Mr. Joseph C. Szabo, was followed by 23 technical presentations in the areas of Pedestrian Safety, Hazard Ma...

  16. Pedestrians have the right of way at CERN

    CERN Multimedia

    2002-01-01

    At CERN, we are all pedestrians, often drivers, and occasionally cyclists. But our means of locomotion do not matter so long as we exercise caution and remember that a pedestrian has equal rights as a road user, except that he runs greater risks.   Whether we also travel by bike or car, irrrespective of our means of locomotion at CERN we are all pedestrians! Whether going on foot to our office, the cafeteria or a building where colleagues work, we are much more in harm's way than as a driver sitting in the shell of steel that is a car. There are some 8000 people working on the different sites of CERN. That means 8000 potential pedestrians and 8000 reasons for trying to keep the roads safe. Whether behind the steering wheel or on a bike, we sometimes forget that the roadway is not just for vehicles. Pedestrians are also fully fledged road users with equal rights. That is why drivers must remain alert and take care not to block pedestrian crossings, pavements or access ways, and why special caution...

  17. Diagnosing in building main pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Telegin, L.G.; Gorelov, A.S.; Kurepin, B.N.; Orekhov, V.I.; Vasil' yev, G.G.; Yakovlev, Ye. I.

    1984-01-01

    General principles are examined for technical diagnosis in building main pipelines. A technique is presented for diagnosis during construction, as well as diagnosis of the technical state of the pipeline-construction machines and mechanisms. The survey materials could be used to set up construction of main pipelines.

  18. Richards Bay effluent pipeline

    CSIR Research Space (South Africa)

    Lord, DA

    1986-07-01

    Full Text Available of major concern identified in the effluent are the large volume of byproduct calcium sulphate (phosphogypsum) which would smother marine life, high concentrations of fluoride highly toxic to marine life, heavy metals, chlorinated organic material... ........................ 9 THE RICHARDS BAY PIPELINE ........................................ 16 Environmental considerations ................................... 16 - Phosphogypsum disposal ................................... 16 - Effects of fluoride on locally occurring...

  19. Central oxygen pipeline failure

    African Journals Online (AJOL)

    surgical intensive care unit (ICU), with two patients on full ventilation and ... uncertainty around the cause of the failure and the restoration, .... soon as its level also falls below three tons. Should ... (properly checked and closed prior to each anaesthetic). ... in use at the time of the central oxygen pipeline failure at Tygerberg.

  20. Characteristics of operating pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gallyamov, A K; Armenskii, E A; Gimaev, R G; Mastobaev, B N; Shammazov, A M

    1977-04-01

    The interval in pressure changes according to operational data for the Kamennyi Log--Perm oil pipeline was determined with the aid of the pattern identification method. This has made it possible to determine pressure changes in the operational process. 2 references, 1 table.

  1. Transient cavitation in pipelines

    NARCIS (Netherlands)

    Kranenburg, C.

    1974-01-01

    The aim of the present study is to set up a one-dimensional mathematical model, which describes the transient flow in pipelines, taking into account the influence of cavitation and free gas. The flow will be conceived of as a three-phase flow of the liquid, its vapour and non-condensible gas. The

  2. Design and stabilization works of the km 767 slope of Bolivia-Brazil gas pipeline; Projeto e obra de estabilizacao do talude do km 767 do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Hudson R.; Vasconcellos, Carlos Renato Aragonez de [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline starts at Santa Cruz de La Sierra city, in Bolivia, and goes until Canoas City (RS) in Brazil, with a total extent of 3,150 km. The pipeline crosses in the 2,593 km established in Brazilian soil, the most diverse types of geology and geomorphology. Along the line, the right-of-way (ROW) also crosses a lot of roads, railways, rivers and lakes. During a routine inspection (foot patrol), signs of instability were detected at an embankment slope of a highway of the Santa Catarina state, at the pipeline crossing. An eventual failure of this slope could put the pipeline at risk. The aim of this paper is to present the aspects of the stabilizations phases, since field investigation, design, works, instrumentation, until monitoring. Emphasis is given to the design criteria to pipeline safety. The solution adopted is composite by soil nailing, a changing of slope inclination and superficial drainage system. (author)

  3. Effect of the welding process on the microstructure and microhardness of API 5L X80 steel welded joint used for oil transportation pipeline; Efeito do processo de soldagem sobre a microestrutura e a microdureza de juntas soldadas de aco API 5L X80 usado em tubulacoes para transporte de petroleo

    Energy Technology Data Exchange (ETDEWEB)

    Alves, R.T.P.; Albuquerque, S.F. [Universidade Federal de Campina Grande (UFCG), PB (Brazil); Maciel, T.M.; Almeida, D.M.; Santos, M.A.

    2008-07-01

    This study had as objective to evaluate the microstructure and microhardness of API 5L X80 steel welded joints, used for pipelines to transport oil and gas, using the Shield Metal Arc Welding process with pre- heating temperature of 200 deg C and 400 deg C and the AWS E8010G electrode as filler metal. For this, besides the microhardness of the welded joint, the weld metals percentiles of micro-constituents and of columnar and regenerated grains and the medium size and extension of the heat affected zone were evaluated. The percentage of acicular ferrite in weld metal ranged from 13% to 33% which generated values of microhardness from 114 HV to 309 HV. (author)

  4. Global offshore pipeline markets

    International Nuclear Information System (INIS)

    Knight, R.; Parsons, B.

    2001-01-01

    In this article, two experts forecast a recovery in the offshore pipeline market followed by accelerating growth. A number of clearly definable macro trends are affecting the world offshore oil and gas industry and will be of considerable significance to the offshore pipelines industry. The authors' view is of markets that show every chance of enjoying long-term growth prospects driven by the fundamentals of a continuing increase in demand for offshore oil and gas. The offshore industry however has a highly cyclical nature, due to the impact of variations in oil and gas prices and the differing state of maturity of individual regions. Therefore those companies that are able to offer the widest range of pipe types and diameters and methods of installation across the greatest range of geographic markets are likely to prosper most. Thus, this continues to be a market best suited to those able to operate on a global scale and make a corporate commitment measured in decades

  5. Instrumented Pipeline Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  6. Assessment of ecological and human health risks of heavy metal contamination in agriculture soils disturbed by pipeline construction.

    Science.gov (United States)

    Shi, Peng; Xiao, Jun; Wang, Yafeng; Chen, Liding

    2014-02-28

    The construction of large-scale infrastructures such as nature gas/oil pipelines involves extensive disturbance to regional ecosystems. Few studies have documented the soil degradation and heavy metal contamination caused by pipeline construction. In this study, chromium (Cr), cadmium (Cd), copper (Cu), nickel (Ni), lead (Pb) and zinc (Zn) levels were evaluated using Index of Geo-accumulation (Igeo) and Potential Ecological Risk Index (RI) values, and human health risk assessments were used to elucidate the level and spatial variation of heavy metal pollution risks. The results showed that the impact zone of pipeline installation on soil heavy metal contamination was restricted to pipeline right-of-way (RoW), which had higher Igeo of Cd, Cu, Ni and Pb than that of 20 m and 50 m. RI showed a declining tendency in different zones as follows: trench > working zone > piling area > 20 m > 50 m. Pipeline RoW resulted in higher human health risks than that of 20 m and 50 m, and children were more susceptible to non-carcinogenic hazard risk. Cluster analysis showed that Cu, Ni, Pb and Cd had similar sources, drawing attention to the anthropogenic activity. The findings in this study should help better understand the type, degree, scope and sources of heavy metal pollution from pipeline construction to reduce pollutant emissions, and are helpful in providing a scientific basis for future risk management.

  7. Standardization process aligned to integrated management system: the case of TRANSPETRO's Oil Pipelines and Terminals Unit

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Labrunie, Charles; Araujo, Dario Doria de [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos

    2009-07-01

    This paper presents the implementation by PETROBRAS Transporte S.A. - TRANSPETRO of its Oil Pipelines and Terminals Standardization Program (PRONOT) within the scope of the 'Integrated Management System' (IMS). This program, launched in 2006 in the regions where the company operates, aims at standardizing all of its oil pipeline and terminal operations. Its implementation was planned in two phases: the first, already successfully concluded, refers to pipeline operations, industrial maintenance and right-of-way activities management; and the second, initiated in 2009, encompasses cross-sectional activities including health, safety and environment (HSE); training and development of oil pipeline workforce; communication with stake holders; oil pipeline integrity; and engineering project requirements. The documental structures of TRANSPETRO IMS and PRONOT are described and represented graphically to emphasize the intentional alignment of the standardization process carried out by the Oil Pipelines and Terminals Unit to the corporate IMS, based upon national and international literature review and through practical research focusing on the best international practices. (author)

  8. Assessment of Ecological and Human Health Risks of Heavy Metal Contamination in Agriculture Soils Disturbed by Pipeline Construction

    Directory of Open Access Journals (Sweden)

    Peng Shi

    2014-02-01

    Full Text Available The construction of large-scale infrastructures such as nature gas/oil pipelines involves extensive disturbance to regional ecosystems. Few studies have documented the soil degradation and heavy metal contamination caused by pipeline construction. In this study, chromium (Cr, cadmium (Cd, copper (Cu, nickel (Ni, lead (Pb and zinc (Zn levels were evaluated using Index of Geo-accumulation (Igeo and Potential Ecological Risk Index (RI values, and human health risk assessments were used to elucidate the level and spatial variation of heavy metal pollution risks. The results showed that the impact zone of pipeline installation on soil heavy metal contamination was restricted to pipeline right-of-way (RoW, which had higher Igeo of Cd, Cu, Ni and Pb than that of 20 m and 50 m. RI showed a declining tendency in different zones as follows: trench > working zone > piling area > 20 m > 50 m. Pipeline RoW resulted in higher human health risks than that of 20 m and 50 m, and children were more susceptible to non-carcinogenic hazard risk. Cluster analysis showed that Cu, Ni, Pb and Cd had similar sources, drawing attention to the anthropogenic activity. The findings in this study should help better understand the type, degree, scope and sources of heavy metal pollution from pipeline construction to reduce pollutant emissions, and are helpful in providing a scientific basis for future risk management.

  9. Pipeline corridors through wetlands - impacts on plant communities: Deep Creek and Brandy Branch crossings, Nassau County, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of surveys conducted July 14-18, 1992, at the Deep Creek and the Brandy Branch crossings of a pipeline installed during May 1991 in Nassau County, Florida. Both floodplains supported bottomland hardwood forests. The pipeline at the Deep Creek crossing was installed by means of horizontal directional drilling after the ROW had been clear-cut, while the pipeline at the Brandy Branch crossing was installed by means of conventional open trenching. Neither site was seeded or fertilized. At the time of sampling, a dense vegetative community, made up primarily of native perennial herbaceous species, occupied the ROW within the Deep Creek floodplain. The Brandy Branch ROW was vegetated by a less dense stand of primarily native perennial herbaceous plants. Plant diversity was also lower at the Brandy Branch crossing than at the Deep Creek crossing. The results suggest that some of the differences in plant communities are related to the more hydric conditions at the Brandy Branch floodplain.

  10. Russia: the pipeline diplomacy

    International Nuclear Information System (INIS)

    Bourdillon, Y.

    2005-01-01

    First world producer of oil and gas, Russia wishes to use its mastery of energy distribution to recover its great power status. The oil and gas pipelines network is the basement used by Russia to build up its hegemony in Europe. The Russian oil and gas companies are also carrying out a long-term strategy of international expansion, in particular thanks to investments in the neighboring countries for the building of new infrastructures or the purchase of oil refineries. (J.S.)

  11. Pipeline Optimization Program (PLOP)

    Science.gov (United States)

    2006-08-01

    the framework of the Dredging Operations Decision Support System (DODSS, https://dodss.wes.army.mil/wiki/0). PLOP compiles industry standards and...efficiency point ( BEP ). In the interest of acceptable wear rate on the pump, industrial standards dictate that the flow Figure 2. Pump class as a function of...percentage of the flow rate corresponding to the BEP . Pump Acceptability Rules. The facts for pump performance, industrial standards and pipeline and

  12. Pipeline network and environment

    International Nuclear Information System (INIS)

    Oliveira Nascimento, I.; Wagner, J.; Silveira, T.

    2012-01-01

    The Rio de Janeiro is one of 27 units of Brazil. It is located in the eastern portion of the Southeast and occupies an area of 43 696.054 km², being effectively the 3rd smallest state in Brazil. This state in recent years has suffered from erosion problems caused by the deployment of the network pipeline. The deployment pipeline is part of the activities related to the oil industry has caused a more intense conflict between the environment and economic activities, modifying the soil structure and distribution of surface and subsurface flows. This study aimed to analyze the erosion caused by the removal of soil for the deployment of pipeline transportation, with the consequences of the emergence of numerous gullies, landslides and silting of rivers. For the development of this study were performed bibliographic research, field work, mapping and digital preparation of the initial diagnosis of active processes and what the consequent environmental impacts. For these reasons, we conclude that the problems could be avoided or mitigated if there was a prior geological risk management. (author)

  13. United States petroleum pipelines: An empirical analysis of pipeline sizing

    Science.gov (United States)

    Coburn, L. L.

    1980-12-01

    The undersizing theory hypothesizes that integrated oil companies have a strong economic incentive to size the petroleum pipelines they own and ship over in a way that means that some of the demand must utilize higher cost alternatives. The DOJ theory posits that excess or monopoly profits are earned due to the natural monopoly characteristics of petroleum pipelines and the existence of market power in some pipelines at either the upstream or downstream market. The theory holds that independent petroleum pipelines owned by companies not otherwise affiliated with the petroleum industry (independent pipelines) do not have these incentives and all the efficiencies of pipeline transportation are passed to the ultimate consumer. Integrated oil companies on the other hand, keep these cost efficiencies for themselves in the form of excess profits.

  14. Pipelines : moving biomass and energy

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, A. [Alberta Univ., Edmonton, AB (Canada). Dept. of Mechanical Engineering

    2006-07-01

    Moving biomass and energy through pipelines was presented. Field sourced biomass utilization for fuel was discussed in terms of competing cost factors; economies of scale; and differing fuel plant sizes. The cost versus scale in a bioenergy facility was illustrated in chart format. The transportation cost of biomass was presented as it is a major component of total biomass processing cost and is in the typical range of 25-45 per cent of total processing costs for truck transport of biomass. Issues in large scale biomass utilization, scale effects in transportation, and components of transport cost were identified. Other topics related to transportation issues included approaches to pipeline transport; cost of wood chips in pipeline transport; and distance variable cost of transporting wood chips by pipeline. Practical applications were also offered. In addition, the presentation provided and illustrated a model for an ethanol plant supplied by truck transport as well as a sample configuration for 19 truck based ethanol plants versus one large facility supplied by truck plus 18 pipelines. Last, pipeline transport of bio-oil and pipeline transport of syngas was discussed. It was concluded that pipeline transport can help in reducing congestion issues in large scale biomass utilization and that it can offer a means to achieve large plant size. Some current research at the University of Alberta on pipeline transport of raw biomass, bio-oil and hydrogen production from biomass for oil sands and pipeline transport was also presented. tabs., figs.

  15. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  16. Incidental electric heating of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sonninskii, A V; Sirotin, A M; Vasiliev, Y N

    1981-04-01

    VNIIgaz has improved the conventional Japanese SECT pipeline-heating system, which uses a small steel tube that contains an insulated heater/conductor and is welded to the top of the pipeline. The improved version has two insulated electric heaters - one on the top and the other on the bottom of the pipeline - located inside steel angle irons that are welded to the pipeline. A comparison of experimental results from heating a 200-ft pipeline with both systems at currents of up to 470 A clearly demonstrated the better heating efficiency of the VNIIgaz unit. The improved SECT system would be suitable for various types of pipelines, including gas lines, in the USSR's far north regions.

  17. Hydrocarbons pipeline transportation risk assessment

    Science.gov (United States)

    Zanin, A. V.; Milke, A. A.; Kvasov, I. N.

    2018-04-01

    The pipeline transportation applying risks assessment issue in the arctic conditions is addressed in the paper. Pipeline quality characteristics in the given environment has been assessed. To achieve the stated objective, the pipelines mathematical model was designed and visualized by using the software product SOLIDWORKS. When developing the mathematical model the obtained results made possible to define the pipeline optimal characteristics for designing on the Arctic sea bottom. In the course of conducting the research the pipe avalanche collapse risks were examined, internal longitudinal and circular loads acting on the pipeline were analyzed, as well as the water impact hydrodynamic force was taken into consideration. The conducted calculation can contribute to the pipeline transport further development under the harsh climate conditions of the Russian Federation Arctic shelf territory.

  18. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Regulations to require operators of gas distribution pipelines to develop and implement integrity management...

  19. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-01-13

    ... Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' The final rule...

  20. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  1. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0156] Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of advisory committee...

  2. Evaluation of revegetation progress and erosion-prone areas along oil and gas pipelines in Azerbaijan

    Energy Technology Data Exchange (ETDEWEB)

    Bayramov, Emil [BP British Petroleum, Baku (Azerbaijan)

    2012-09-15

    The construction of the Baku-Tbilisi-Ceyhan (BTC) oil and South Caucasus gas (SCP) pipelines was completed in 2005 and 2006, respectively. The Azerbaijan section of the BTC oil and SCP gas pipelines is 442 km long and lies in a 44 m wide corridor named as the Right-of-Way (RoW). BTC and SCP pipelines are aligned parallel to each other within the RoW. The construction process significantly disturbed vegetation and soil cover along the RoW of the pipelines. The revegetation and erosion control measures were conducted after the completion of construction to restore disturbed footprints of construction. The general goals of the present studies, dedicated to the environmental monitoring and erosion control measures were to evaluate the status of the revegetation in 2007 since the completion of the construction activities and to determine erosion-prone areas along the RoW. Quantitative assessment of vegetation cover (VC) was based on the regression and RMSE analysis using IKONOS NDVI 2007 and in-situ estimation of VC percentage for the normalization of NDVI to VC. The prediction of erosion-prone areas was based on the Universal Soil Loss Equation (USLE). The prediction reliability of USLE was evaluated using in-situ collected erosion occurrences. (orig.)

  3. Rehabilitation of Sao Sebastiao-Cubatao oil pipeline: integrated planning and action - key for project success

    Energy Technology Data Exchange (ETDEWEB)

    Serodio, Conrado J.M. [GDK S.A., Salvador, BA (Brazil)

    2009-12-19

    The execution of the OSBAT 24{sup o}il pipeline rehabilitation project, comprising the substitution of a 30 km section of the 37 years old pipeline has become a real benchmark in the history of this kind of job. The pipeline is inserted in one of the most sensitive environmental areas of the Sao Paulo State - the last Environmental Protection Area of the Mata Atlantica . The growth of human presence in its surroundings during the last three decades, has caused the right-of-way to be totally confined by luxury housing developments, streets, highways and resorts, as well as by the local communities and their activities, schools, and commerce. The pipeline runs through the Serra do Mar unstable mountain range slopes, with sequences of very steep hills and ravines followed by swamps and rivers. The success of such a challenging project - assembling the new line in a narrow ROW with all its restrictions, where the old line was still in operation, and complying with the tight work schedule required by PETROBRAS, was only possible due to a carefully managed combination of: accurate planning, best engineering methods and equipment and experienced workforce, deeply integrated in a massive effort towards safety, environmental care and social responsibility. (author)

  4. Slurry pipeline technology: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Jay P. [Pipeline Systems Incorporated (PSI), Belo Horizonte, MG (Brazil); Lima, Rafael; Pinto, Daniel; Vidal, Alisson [Ausenco do Brasil Engenharia Ltda., Nova Lima, MG (Brazil). PSI Div.

    2009-12-19

    Slurry pipelines represent an economical and environmentally friendly transportation means for many solid materials. This paper provides an over-view of the technology, its evolution and current Brazilian activity. Mineral resources are increasingly moving farther away from ports, processing plants and end use points, and slurry pipelines are an important mode of solids transport. Application guidelines are discussed. State-of-the-Art technical solutions such as pipeline system simulation, pipe materials, pumps, valves, automation, telecommunications, and construction techniques that have made the technology successful are presented. A discussion of where long distant slurry pipelines fit in a picture that also includes thickened and paste materials pipe lining is included. (author)

  5. 76 FR 44985 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2011-07-27

    .... PHMSA-2011-0177] Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding AGENCY... liquid pipelines to communicate the potential for damage to pipeline facilities caused by severe flooding... pipelines in case of flooding. ADDRESSES: This document can be viewed on the Office of Pipeline Safety home...

  6. 77 FR 19799 - Pipeline Safety: Pipeline Damage Prevention Programs

    Science.gov (United States)

    2012-04-02

    ... noted ``when the oil pipeline industry developed the survey for its voluntary spill reporting system...) [cir] The American Public Gas Association (APGA) [cir] The Association of Oil Pipelines (AOPL) [cir... the contrary, all 50 states in the United States have a law designed to prevent excavation damage to...

  7. Focus on safety : a comparative analysis of pipeline safety performance 2000-2002

    International Nuclear Information System (INIS)

    2004-01-01

    Canada's National Energy Board (NEB) is responsible for the promotion of safety, environmental protection and economic efficiency in the Canadian public interest in regulating the design, construction, operation and abandonment of interprovincial and international pipelines within Canada. This second annual report provides a review of the safety performance of oil and gas pipeline companies that are regulated by the NEB. The data used to prepare this report originates from two sources: incident reports submitted under the Onshore Pipeline Regulations, 1999, and from information voluntarily provided by pipeline companies under the Safety Performance Indicators (SPI) initiative. Data comparisons with external reference organizations were included. Six key indicators have been identified to provide comprehensive measures of safety performance for pipeline companies: fatalities, ruptures, injury frequencies, liquid releases, gas releases, and unauthorized activities on the right of way. The safety performance of the federally regulated pipeline industry within Canada was satisfactory during this reporting period (2000-2002). The contractor injury frequency rates reported in 2002 were lower than those reported in 2001, and exhibited more consistency with the levels reported in 2000. The NEB is of the opinion that the elevated number of liquid hydrocarbon spills reported in 2000 were a result of elevated construction levels. No fatalities were reported. There was an increase to three from two in the number of ruptures, due in large part to metal loss (corrosion) and cracking, and external interference (third party damage). The number of spills increased to 76 in 2002 from 55 in 2001, which appears to be more in line with industry averages. The volume of hydrocarbon liquid released in 2002 represented one third the volume released in 2001. refs., 5 tabs., 14 figs

  8. Lay Pipeline Abandonment Head during Some

    African Journals Online (AJOL)

    2016-12-01

    Dec 1, 2016 ... is very cruel to the structural integrity of the pipeline structure after ... and properties may be jeopardized should the pipeline structure be used for oil or gas transport when such ... pipelines under bending may alter the material.

  9. Pipeline Processing for VISTA

    Science.gov (United States)

    Lewis, J. R.; Irwin, M.; Bunclark, P.

    2010-12-01

    The VISTA telescope is a 4 metre instrument which has recently been commissioned at Paranal, Chile. Equipped with an infrared camera, 16 2Kx2K Raytheon detectors and a 1.7 square degree field of view, VISTA represents a huge leap in infrared survey capability in the southern hemisphere. Pipeline processing of IR data is far more technically challenging than for optical data. IR detectors are inherently more unstable, while the sky emission is over 100 times brighter than most objects of interest, and varies in a complex spatial and temporal manner. To compensate for this, exposure times are kept short, leading to high nightly data rates. VISTA is expected to generate an average of 250 GB of data per night over the next 5-10 years, which far exceeds the current total data rate of all 8m-class telescopes. In this presentation we discuss the pipelines that have been developed to deal with IR imaging data from VISTA and discuss the primary issues involved in an end-to-end system capable of: robustly removing instrument and night sky signatures; monitoring data quality and system integrity; providing astrometric and photometric calibration; and generating photon noise-limited images and science-ready astronomical catalogues.

  10. Accuracy Limitations of Pipelined ADCs

    NARCIS (Netherlands)

    Quinn, P.J.; Roermund, van A.H.M.

    2005-01-01

    In this paper, the key characteristics of the main errors which affect the performance of a switched capacitor pipelined ADC are presented and their effects on the ADC transfer characteristics demonstrated. Clear and concise relationships are developed to aid optimized design of the pipeline ADC and

  11. Efeito da enxertia em mandioca

    OpenAIRE

    Bomfim, Nayra Nascimento

    2011-01-01

    Enxertos de duas espécies silvestres (M. glaziovii e M. fortalezensis) sobre M. esculenta, mandioca, foram estudados morfologicamente, anatomicamente e citogeneticamente e a fim de se avaliar possíveis efeitos devido à interação entre enxerto e porta-enxerto. Foram feitas análises anatômicas das raízes dos porta-enxertos UnB 201 e UnB 122 (variedades de M. esculenta), em comparação com as variedades não enxertadas. Analisou-se a meiose em enxerto da espécie M. glaziovii que apresentava morfol...

  12. Recent developments in pipeline welding practice

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Fourteen chapters are included: overview of pipeline welding systems and quality assurance, CRC automatic welding system, H.C. Price Co. automatic welding system, semi-automatic MIG-welding process, partial penetration welding of steel pipes for gas distribution, construction procedures and quality control in offshore pipeline construction, welding in repair and maintenance of gas transmission pipelines, British Gas studies of welding on pressurized gas transmission pipelines, hot tapping pipelines, underwater welding for offshore pipelines and associated equipment, radial friction welding, material composition vs weld properties, review of NDT of pipeline welds, and safety assurance in pipeline construction. A bibliography of approximately 150 references is included, arranged according to subject and year.

  13. Technical forums as an instrument for knowledge management in oil pipelines and terminals companies: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the experience of TRANSPETRO's Oil Pipelines and Terminals Unit regarding an institutionalized knowledge management (KM) process of systematically promoting technical forums focused on: pipeline and terminal operations; industrial maintenance; and right-of-way activities management. This empirical work adds evidence that in the model of cooperative and communicative knowledge management it is necessary to motivate staff to provide the company with their tacit knowledge and to take a proactive part in knowledge management processes, particularly in technical forums. Within this KM perspective, technical forums have been held by TRANSPETRO for the following purposes: to discuss the main barriers and challenges the oil pipelines and terminals unit has to face in the coming years; to share and disseminate good practices concerning oil pipeline and terminal activities; to discuss new processes, methods and equipment developments with potential application in business and operational processes; to establish action plans concerning the main challenges, barriers and opportunities; to disseminate Research and Development (R and D) projects in course, new procedures, methods and equipment and to promote integration among forum attendees. The two year-experience in TRANSPETRO's Oil Pipelines and Terminals Unit revealed that technical forums have been an important instrument for cooperative and communicative knowledge management, according to evaluations from 173 attendees. (author)

  14. Technical forums as an instrument for knowledge management in oil pipelines and terminals companies: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the experience of TRANSPETRO's Oil Pipelines and Terminals Unit regarding an institutionalized knowledge management (KM) process of systematically promoting technical forums focused on: pipeline and terminal operations; industrial maintenance; and right-of-way activities management. This empirical work adds evidence that in the model of cooperative and communicative knowledge management it is necessary to motivate staff to provide the company with their tacit knowledge and to take a proactive part in knowledge management processes, particularly in technical forums. Within this KM perspective, technical forums have been held by TRANSPETRO for the following purposes: to discuss the main barriers and challenges the oil pipelines and terminals unit has to face in the coming years; to share and disseminate good practices concerning oil pipeline and terminal activities; to discuss new processes, methods and equipment developments with potential application in business and operational processes; to establish action plans concerning the main challenges, barriers and opportunities; to disseminate Research and Development (R and D) projects in course, new procedures, methods and equipment and to promote integration among forum attendees. The two year-experience in TRANSPETRO's Oil Pipelines and Terminals Unit revealed that technical forums have been an important instrument for cooperative and communicative knowledge management, according to evaluations from 173 attendees. (author)

  15. Pipeline Corridors through wetlands -- Impacts on plant communities: Mill Creek Tributary Crossing, Jefferson County, New York, 1992 Survey

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology; Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to identify representative impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of the survey July 1992, at the Mills Creek tributary crossing, Jefferson County, New York. Data were collected from three wetland communities along the 1991 pipeline and compared with predisturbance data obtained in a June 1991 survey. Within one year after pipeline installation, 50% of the soil surface of the ROW in the scrub-shrub community was covered by emergent vegetation. Average wetland values for the ROW in 1992 were lower than in 1991, indicating that the removal of woody plants resulted in a community composed of species with greater fidelity to wetlands. In the emergent marsh community after one year, the average percentage of surface covered by standing water was greater in the ROW than in the adjacent natural areas. The ROW in the forested wetland community also contained standing water, although none was found in the natural forest areas. The entire study site remains a wetland, with the majority of plant species in all sites being either obligate or facultative wetland species. Weighted and unweighted average wetland indices for each community, using all species, indicated wetland vegetation within the newly established ROW.

  16. Maglev crude oil pipeline

    Science.gov (United States)

    Knolle, Ernst G.

    1994-01-01

    This maglev crude oil pipeline consists of two conduits guiding an endless stream of long containers. One conduit carries loaded containers and the other empty returns. The containers are levitated by permanent magnets in repulsion and propelled by stationary linear induction motors. The containers are linked to each other in a manner that allows them, while in continuous motion, to be folded into side by side position at loading and unloading points. This folding causes a speed reduction in proportion to the ratio of container diameter to container length. While in side by side position, containers are opened at their ends to be filled or emptied. Container size and speed are elected to produce a desired carrying capacity.

  17. Shipping Information Pipeline

    DEFF Research Database (Denmark)

    Jensen, Thomas

    to creating a more efficient shipping industry, and a number of critical issues are identified. These include that shipments depend on shipping information, that shipments often are delayed due to issues with documentation, that EDI messages account for only a minor part of the needed information......This thesis applies theoretical perspectives from the Information Systems (IS) research field to propose how Information Technology (IT) can improve containerized shipping. This question is addressed by developing a set of design principles for an information infrastructure for sharing shipping...... information named the Shipping Information Pipeline (SIP). Review of the literature revealed that IS research prescribed a set of meta-design principles, including digitalization and digital collaboration by implementation of Inter-Organizational Systems based on Electronic Data Interchange (EDI) messages...

  18. The Leaking Pipeline

    DEFF Research Database (Denmark)

    Henningsen, Inge; Højgaard, Lis

    2002-01-01

    negotiations of cultural prescriptions of gendered subjectivity and identities, organizational understandings and procedures embedded in specific university cultures, traditional of different science disciplines, and the systemic logic and political rationale of the education and research system....... these positions, and one that maintains that a closer look at the statistics does not support this optimism because women’s percentage in recruitment positions is not increasing as the pool of potential female researchers increases, or to put it metaphorically, “the pipeline is leaking women all along” (Alper...... it identifies and describes a Danish verion of ‘the leaky pipeline’ from analyses of the ratios of women in science from high school through tenured positions. Finally it illustrates the cultural mechanisms at play in this process, based on the results of three studies. The first two analyze the educational...

  19. Northern pipelines : challenges and needs

    Energy Technology Data Exchange (ETDEWEB)

    Dean, D.; Brownie, D. [ProLog Canada Inc., Calgary, AB (Canada); Fafara, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2007-07-01

    Working Group 10 presented experiences acquired from the operation of pipeline systems in a northern environment. There are currently 3 pipelines operating north of 60, notably the Shiha gas pipeline near Fort Liard, the Ikhil gas pipeline in Inuvik and the Norman Wells oil pipeline. Each has its unique commissioning, operating and maintenance challenges, as well as specific training and logistical support requirements for the use of in-line inspection tools and other forms of integrity assessment. The effectiveness of cathodic protection systems in a permafrost northern environment was also discussed. It was noted that the delay of the Mackenzie Gas Pipeline Project by two to three years due to joint regulatory review may lead to resource constraints for the project as well as competition for already scarce human resources. The issue of a potential timing conflict with the Alaskan Pipeline Project was also addressed as well as land use issues for routing of supply roads. Integrity monitoring and assessment issues were outlined with reference to pipe soil interaction monitoring in discontinuous permafrost; south facing denuded slope stability; base lining projects; and reclamation issues. It was noted that automatic welding and inspection will increase productivity, while reducing the need for manual labour. In response to anticipated training needs, companies are planning to involve and train Aboriginal labour and will provide camp living conditions that will attract labour. tabs., figs.

  20. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  1. Effort problem of chemical pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Okrajni, J.; Ciesla, M.; Mutwil, K. [Silesian Technical University, Katowice (Poland)

    1998-12-31

    The problem of the technical state assessment of the chemical pipelines working under mechanical and thermal loading has been shown in the paper. The pipelines effort after the long time operating period has been analysed. Material geometrical and loading conditions of the crack initiation and crack growth process in the chosen object has been discussed. Areas of the maximal effort have been determined. The material structure charges after the long time operating period have been described. Mechanisms of the crack initiation and crack growth in the pipeline elements have been analysed and mutual relations between the chemical and mechanical influences have been shown. (orig.) 16 refs.

  2. Fishing intensity around the BBL pipeline

    NARCIS (Netherlands)

    Hintzen, Niels

    2016-01-01

    Wageningen Marine Research was requested by ACRB B.V. to investigate the fishing activities around the BBL pipeline. This gas pipeline crosses the southern North Sea from Balgzand (near Den Helder) in the Netherlands to Bacton in the UK (230km). This pipeline is abbreviated as the BBL pipeline. Part

  3. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-03-21

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting...

  4. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  5. Logistics aspects of petroleum pipeline operations

    Directory of Open Access Journals (Sweden)

    W. J. Pienaar

    2010-11-01

    Full Text Available The paper identifies, assesses and describes the logistics aspects of the commercial operation of petroleum pipelines. The nature of petroleum-product supply chains, in which pipelines play a role, is outlined and the types of petroleum pipeline systems are described. An outline is presented of the nature of the logistics activities of petroleum pipeline operations. The reasons for the cost efficiency of petroleum pipeline operations are given. The relative modal service effectiveness of petroleum pipeline transport, based on the most pertinent service performance measures, is offered. The segments in the petroleum-products supply chain where pipelines can play an efficient and effective role are identified.

  6. Pipelines programming paradigms: Prefab plumbing

    International Nuclear Information System (INIS)

    Boeheim, C.

    1991-08-01

    Mastery of CMS Pipelines is a process of learning increasingly sophisticated tools and techniques that can be applied to your problem. This paper presents a compilation of techniques that can be used as a reference for solving similar problems

  7. Economic evaluation: wood stave pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Rook, M.E.

    The spray of leakage from the wood stave water supply pipeline serving the New England Power Company's (NEPCO) Searsburg hydroelectric development had caused this facility to be dubbed ''The Searsburg Car Wash.'' In July, 1982, excessive leakage from this pipeline prompted NEPCO to perform a technical inspection which would inform the company's decision to replace, repair, or abandon the pipeline. The inspection indicated that a combination of interrelated factors has led to rapid deterioration. The feasibility study, which included a benefit -cost analysis of a times replacement with a continued repair program weighed annually by a risk factor representing the probability of pipeline failure during the replacement period, determined that direct replacement was most advantageous. 4 figures, 1 figures.

  8. Hybrid laser-gas metal arc welding (GMAW) of high strength steel gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Harris, Ian D.; Norfolk, Mark I. [Edison Welding Institute (EWI), Columbus, Ohio (United States)

    2009-07-01

    Hybrid Laser/arc welding process (HLAW) can complete 5G welds, assure weld soundness, material properties, and an acceptable geometric profile. Combining new lasers and pulsed gas metal arc welding (GMAW-P) has led to important innovations in the HLAW process, increasing travel speed for successful root pass welding. High power Yb fiber lasers allow a 10 kW laser to be built the size of a refrigerator, allowing portability for use on the pipeline right-of-way. The objective was to develop and apply an innovative HLAW system for mechanized welding of high strength, high integrity, pipelines and develop 5G welding procedures for X80 and X100 pipe, including mechanical testing to API 1104. A cost-matched JIP developed a prototype HLAW head based on a commercially available bug and band system (CRC-Evans P450). Under the US Department of Transportation (DOT) project, the subject of this paper, the system was used to advance pipeline girth welding productivity. External hybrid root pass welding achieved full penetration welds with a 4-mm root at a travel speed of 2.3-m/min. Welds were made 'double down' using laser powers up to 10 kW and travel speeds up to 3-m/min. The final objective of the project was to demonstrate the hybrid LBW/GMAW system under simulated field conditions. (author)

  9. Decoupling pipeline influences in soil resistivity measurements with finite element techniques

    Science.gov (United States)

    Deo, R. N.; Azoor, R. M.; Zhang, C.; Kodikara, J. K.

    2018-03-01

    Periodic inspection of pipeline conditions is an important asset management strategy conducted by water and sewer utilities for efficient and economical operations of their assets in field. The Level 1 pipeline condition assessment involving resistivity profiling along the pipeline right-of-way is a common technique for delineating pipe sections that might be installed in highly corrosive soil environment. However, the technique can suffer from significant perturbations arising from the buried pipe itself, resulting in errors in native soil characterisation. To address this problem, a finite element model was developed to investigate the degree to which pipes of different a) diameters, b) burial depths, and c) surface conditions (bare or coated) can influence in-situ soil resistivity measurements using Wenner methods. It was found that the greatest errors can arise when conducting measurements over a bare pipe with the array aligned parallel to the pipe. Depending upon the pipe surface conditions, in-situ resistivity measurements can either be underestimated or overestimated from true soil resistivities. Following results based on simulations and decoupling equations, a guiding framework for removing pipe influences in soil resistivity measurements were developed that can be easily used to perform corrections on measurements. The equations require simple a-prior information on the pipe diameter, burial depth, surface condition, and the array length and orientation used. Findings from this study have immediate application and is envisaged to be useful for critical civil infrastructure monitoring and assessment.

  10. High resolution satellite imagery : from spies to pipeline management

    Energy Technology Data Exchange (ETDEWEB)

    Adam, S. [Canadian Geomatic Solutions Ltd., Calgary, AB (Canada); Farrell, M. [TransCanada Transmission, Calgary, AB (Canada)

    2000-07-01

    The launch of Space Imaging's IKONOS satellite in September 1999 has opened the door for corridor applications. The technology has been successfully implemented by TransCanada PipeLines in mapping over 1500 km of their mainline. IKONOS is the world's first commercial high resolution satellite which collects data at 1-meter black/white and 4-meter multi-spectral. Its use is regulated by the U.S. government. It is the best source of high resolution satellite image data. Other sources include the Indian Space Agency's IRS-1 C/D satellite and the Russian SPIN-2 which provides less reliable coverage. In addition, two more high resolution satellites may be launched this year to provide imagery every day of the year. IKONOS scenes as narrow as 5 km can be purchased. TransCanada conducted a pilot study to determine if high resolution satellite imagery is as effective as ortho-photos for identifying population structures within a buffer of TransCanada's east line right-of-way. The study examined three unique segments where residential, commercial, industrial and public features were compared. It was determined that IKONOS imagery is as good as digital ortho-photos for updating structures from low to very high density areas. The satellite imagery was also logistically easier than ortho-photos to acquire. This will be even more evident when the IKONOS image archives begins to grow. 4 tabs., 3 figs.

  11. Pipeline corridors through wetlands - impacts on plant communities: Cassadaga Creek Tributary Crossing, Gerry Township, Chautauqua County, New York. Topical report, August 1992--November 1993

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted over the period of August 3-4, 1992, at the Cassadaga wetlands crossing in Gerry Township, Chautauqua County, New York. The pipeline at this site was installed during February and March 1981. After completion of pipeline installation, the ROW was fertilized, mulched, and seeded with annual ryegrass. Two adjacent sites were surveyed in this study: a forested wetland and an emergent wetlands Eleven years after pipeline installation, the ROW at both sites supported diverse vegetative communities. Although devoid of large woody species, the ROW within the forested wetland had a dense vegetative cover. The ROW within the emergent wetland had a slightly less dense and more diverse vegetative community compared with that in the adjacent natural areas (NAs). The ROW within the emergent wetland also had a large number of introduced species that were not present in the adjacent NAs. The ROW, with its emergent marsh plant community, provided habitat diversity within the forested wetlands Because the ROW contained species not found within the adjacent NAs, overall species diversity was increased.

  12. Pipeline robots with elastic elements

    Directory of Open Access Journals (Sweden)

    A. Matuliauskas

    2002-10-01

    Full Text Available In the article constructions of the pipeline robots with elastic elements are reviewed and the scheme of new original construction is presented. The mathematical models of a robot with one-dimensional vibration exciter with two degrees of freedom were developed and the equations of movement were formed and written. The mathematical model of the pipeline robot with circular elements is formed and its motion equations are presented.

  13. Optimal valve location in long oil pipelines

    OpenAIRE

    Grigoriev, A.; Grigorieva, N.V.

    2007-01-01

    We address the valve location problem, one of the basic problems in design of long oil pipelines. Whenever a pipeline is depressurized, the shutoff valves block the oil flow and seal the damaged part of the pipeline. Thus, the quantity of oil possibly contaminating the area around the pipeline is determined by the volume of the damaged section of the pipeline between two consecutive valves. Then, ecologic damage can be quantified by the amount of leaked oil and the environmental characteristi...

  14. Pipeline for Contraceptive Development

    Science.gov (United States)

    Blithe, Diana L.

    2016-01-01

    The high rates of unplanned pregnancy reflect unmet need for effective contraceptive methods for women, especially for individuals with health risks such as obesity, diabetes, hypertension, and other conditions that may contraindicate use of an estrogen-containing product. Improvements in safety, user convenience, acceptability and availability of products remain important goals of the contraceptive development program. Another important goal is to minimize the impact of the products on the environment. Development of new methods for male contraception has the potential to address many of these issues with regard to safety for women who have contraindications to effective contraceptive methods but want to protect against pregnancy. It also will address a huge unmet need for men who want to control their fertility. Products under development for men would not introduce eco-toxic hormones in the waste water. Investment in contraceptive research to identify new products for women has been limited in the pharmaceutical industry relative to investment in drug development for other indications. Pharmaceutical R&D for male contraception was active in the 1990’s but was abandoned over a decade ago. The Eunice Kennedy Shriver National Institute of Child Health and Human Development (NICHD) has supported a contraceptive development program since 1969. Through a variety of programs including research grants and contracts, NICHD has developed a pipeline of new targets/products for male and female contraception. A number of lead candidates are under evaluation in the NICHD Contraceptive Clinical Trials Network (CCTN) (1–3). PMID:27523300

  15. Crude oil pipeline expansion summary

    International Nuclear Information System (INIS)

    2005-02-01

    The Canadian Association of Petroleum Producers has been working with producers to address issues associated with the development of new pipeline capacity from western Canada. This document presents an assessment of the need for additional oil pipeline capacity given the changing mix of crude oil types and forecasted supply growth. It is of particular interest to crude oil producers and contributes to current available information for market participants. While detailed, the underlying analysis does not account for all the factors that may come into play when individual market participants make choices about which expansions they may support. The key focus is on the importance of timely expansion. It was emphasized that if pipeline expansions lags the crude supply growth, then the consequences would be both significant and unacceptable. Obstacles to timely expansion are also discussed. The report reviews the production and supply forecasts, the existing crude oil pipeline infrastructure, opportunities for new market development, requirements for new pipeline capacity and tolling options for pipeline development. tabs., figs., 1 appendix

  16. Solving an unpiggable pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Walker, James R. [GE Oil and Gas, PII Pipeline Solutions, Cramlington Northumberland (United Kingdom); Kern, Michael [National Grid, New Hampshire (United Kingdom)

    2009-07-01

    Technically, any pipeline can be retrofitted to enable in line inspection. Sensibly however, the expense of excavations and construction of permanent facilities have been, in many cases, exceedingly prohibitive. Even where traditional modifications are feasible from engineering perspectives, flow interruption may not be an option - either because they are critical supply lines or because the associated lost revenues could be nearly insurmountable. Savvy pipeline integrity managers know the safety issue that is at stake over the long term. They are also well aware of the accuracy benefits that high-quality in-line inspection data offer over potentially supply disruptive alternatives such as hydrostatic testing. To complicate matters further, many operators, particularly in the US, now face regulatory pressure to assess the integrity of their yet-uninspected pipelines located in highly populated areas. This paper describes an important project National Grid undertook that made use of a unique pipeline access method that did not require permanent installation of expensive facilities required for in line inspection of a pipeline previously considered 'unpiggable'. Since the pipeline was located in an urban area, flow disruption had to be minimized. This paper will define the project background, its challenges, outcomes and lessons learned for the future. (author)

  17. Calculando o tamanho de efeito no SPSS

    Directory of Open Access Journals (Sweden)

    Juliana Dal-Ri Lindenau

    2012-10-01

    Full Text Available O tamanho de efeito é uma estatística descritiva que serve como complemento ao teste de significância estatística. Cada vez mais esse tipo de abordagem vem sendo estimulada, em alguns casos até exigida, pelas publicações da área cientifica. Foram escolhidas algumas medidas de tamanho de efeito para uma explicação mais detalhada: o tamanho de efeito de  d de Cohen, g de Hedges, delta de Glass para comparação das médias de dois grupos e o f² de Cohen utilizado na análise de medidas correlacionadas. Esses tamanhos de efeito foram calculados em exemplos obtidos a partir de simulação usando o SPSS v.18.0.0

  18. Pipeline corridors through wetlands - impact on plant communities: Mill Creek Tributary Crossing, Jefferson County, New York, 1991 survey. Topical report, June 1991--April 1993

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Argonne National Lab., IL (United States)]|[Trinity Christian College, Palos Heights, IL (United States); Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted in June 1991 at the Mill Creek tributary crossing, Jefferson County, New York. One pipeline had been installed through the wetland in 1966, and another was scheduled to be installed later in 1991. Data were collected along the existing pipeline ROW and also along the planned ROW for use as baseline data in future studies. Four separate communities were surveyed. A scrub-shrub wetland and a forested wetland were sampled along the existing ROW where the planned pipeline was to be installed. A mixed vegetation community was sampled along the existing ROW, west of where the planned pipeline would joint the ROW. A marsh community was sampled along the route of the planned pipeline. All plant species found on the ROW of the scrub-shrub community were also present in the adjacent natural areas. The vegetation on the ROW of the forested wetland community also consisted mostly of species found in the adjacent natural areas. In the mixed vegetation community, a small drainage channel present on the ROW, possibly resulting from the pipeline construction, provided habitat for a number of obligate species not found in other areas of this community. Differences noted among different areas of this community were also attributed to slight variations in elevation.

  19. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Science.gov (United States)

    2011-05-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR 191... Reports AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Issuance of... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a final rule on November 26, 2010...

  20. 75 FR 45591 - Pipeline Safety: Notice of Technical Pipeline Safety Advisory Committee Meetings

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Committee Meetings AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  1. 77 FR 36606 - Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public Meeting

    Science.gov (United States)

    2012-06-19

    ...: Threat Prevention --Working Group 2: Leak Detection/Mitigation & Storage --Working Group 3: Anomaly... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0146] Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public...

  2. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    Directory of Open Access Journals (Sweden)

    Daniel J. Zimmerle

    2017-11-01

    Full Text Available Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH4/hr of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH4/hr [95 to 1065 kg CH4/hr, 95% CI], or 1% [0.2% to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA’s 2015 Greenhouse Inventory and study activity estimates. While EPA’s current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.

  3. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Science.gov (United States)

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Accidents AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. [[Page 45418

  4. New territory for NGL pipelines

    International Nuclear Information System (INIS)

    Turner, C.L.; Billings, F.E.

    1994-01-01

    Even though the NGL pipeline industry appears mature, new geographic territory exists for expansion of NGL pipelines. However, the most fertile territory that must be pursued is the collective opportunities to better link the existing NGL industry. Associations like the Gas Processors Association can not perform the role demanded by a need to share information between the links of the chain on a more real time basis. The Association can not substitute for picking up the phone or calling a meeting of industry participants to discuss proposed changes in policies and procedures. All stakeholders must participate in squeezing out the inefficiencies of the industry. Some expansion and extension of NGL pipelines will occur in the future without ownership participation or commitments from the supply and demand businesses. However, significant expansions linking new supply sources and demand markets will only be made as the supply and demand businesses share long-term strategies and help define the pipeline opportunity. The successful industries of the twenty-first century will not be dominated by a single profitable sector, but rather by those industries which foster cooperation as well as competition. A healthy NGL industry will be comprised of profitable supply businesses and profitable demand businesses, linked together by profitable pipeline businesses

  5. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  6. Emergency preparedness of OSBRA Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Milton P.; Torres, Carlos A.R.; Almeida, Francisco J.C. [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO in the preparation for emergencies in the OSBRA pipeline, showing specific aspects and solutions developed. The company has a standardized approach for the emergency management, based on risk analysis studies, risk management plan and contingency plans. To cover almost 1,000 km of pipeline, the Company avails of Emergency Response Centers and Environmental Defense Center, located at strategic points. In order to achieve preparation, fire fighting training and oil leakage elimination training are provided. Additionally, simulation exercises are performed, following a schedule worked out according to specific criteria and guidelines. As a conclusion, a picture is presented of the evolution of the preparation for emergencies in the OSBRA System which bears the enormous responsibility of transporting flammable products for almost 1,000 km of pipeline, crossing 40 municipalities, 3 states and the Federal District. (author)

  7. Effects of pipeline construction on chernozemic and solonetzic A and B horizons in Central Alberta

    Energy Technology Data Exchange (ETDEWEB)

    Landsburg, S. (NOVA Corp. of Alberta, Calgary, AB (Canada))

    1989-05-01

    The effects of pipeline construction on agricultural soil quality ratings were evaluated for the A and B horizons of Orthic Dark Brown Chernozem and Dark Brown Solonetz soils at three sites in Central Alberta 1 wk after construction. At each site, samples of the Ap horizon from the spoil side, trench, and work side portions of a pipeline right-of-way were compared to a sample of the Ap horizon from an adjacent area unaffected by pipeline construction. Spoil material below replaced topsoil on the trench was compared to a sample of an undisturbed B horizon. Regardless of soil type or land use, construction had no effect on the Ap horizon on the work side. This was due to optimum weather conditions during construction; low rainfall resulted in lack of soil ruting and minimal soil mixing. For both soil types under cultivation, construction increased soluble salt concentrations in the Ap horizons on the spoil side due to mixing of topsoil and spoil materials. There were few effects on the Ap horizon on the spoil side in pasture land, due to trench only topsoil stripping and easy spoil removal from a well-developed sod layer. Both the Ap and spoil from the trench in the Dark Brown Solonetz had increased salt concentrations, while there were few changes in the Dark Brown Chernozem. Mixing of topsoil and spoil material, and bringing salt-enriched material to the spoil surface are thought to be reponsible for the effects due to construction were reflected in the Ap horizon of the trench and spoil side by changes in pH, electrical conductivity, soluble salts and bulk density. Even with the increases in the soil properties monitored, the results indicated that regardless of soil type or land use, pipeline construction did not significantly affect the agricultural soil quality of the A and B horizons. 12 refs., 3 figs., 2 tabs.

  8. 77 FR 51848 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-27

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Program for Gas Distribution Pipelines. DATES: Interested persons are invited to submit comments on or.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and...

  9. 78 FR 5866 - Pipeline Safety: Annual Reports and Validation

    Science.gov (United States)

    2013-01-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0319] Pipeline Safety: Annual Reports and Validation AGENCY: Pipeline and Hazardous Materials... 2012 gas transmission and gathering annual reports, remind pipeline owners and operators to validate...

  10. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  11. 77 FR 27279 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-05-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  12. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  13. 75 FR 53733 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-09-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0246] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous... liquefied natural gas, hazardous liquid, and gas transmission pipeline systems operated by a company. The...

  14. 77 FR 46155 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  15. 77 FR 15453 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... information collection titled, ``Gas Pipeline Safety Program Certification and Hazardous Liquid Pipeline... collection request that PHMSA will be submitting to OMB for renewal titled, ``Gas Pipeline Safety Program...

  16. pipelines cathodic protection design methodologies for impressed

    African Journals Online (AJOL)

    HOD

    oil and gas pipelines corrosion in the United State of. American alone ... or preventing external corrosion of pipeline steels and other metallic .... 2.1 Materials and Impressed Current Design. Carbon steel ..... Research Analysis, Vol. 2, pp 2277 ...

  17. Natural disasters and the gas pipeline system.

    Science.gov (United States)

    1996-11-01

    Episodic descriptions are provided of the effects of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the Cit of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas' pipeline...

  18. 75 FR 63774 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-10-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of... Gas Pipeline Safety Act of 1968, Public Law 90-481, delegated to DOT the authority to develop...

  19. 77 FR 61825 - Pipeline Safety: Notice of Public Meeting on Pipeline Data

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... program performance measures for gas distribution, gas transmission, and hazardous liquids pipelines. The... distribution pipelines (49 CFR 192.1007(e)), gas transmission pipelines (49 CFR 192.945) and hazardous liquids...

  20. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  1. Fishing activity near offshore pipelines, 2017

    NARCIS (Netherlands)

    Machiels, Marcel

    2018-01-01

    On the North Sea bottom lie numerous pipelines to link oil- or gas offshore drilling units, - platforms and processing stations on land. Although pipeline tubes are coated and covered with protective layers, the pipelines risk being damaged through man-made hazards like anchor dropping and fishing

  2. Elasticplastic dynamic analysis of pipelines

    International Nuclear Information System (INIS)

    Veloso Filho, D.; Loula, A.F.D.; Guerreiro, J.N.C.

    1982-01-01

    A model for structural analysis of spatial pipelines constituted by material with perfect elastoplastic behavior and submmited to time dependence stress is presented. The spatial discretization is done using the Finite Element method, and for the time integration of movement equations an stable finite difference algorithm is used. (E.G.) [pt

  3. Customer service drives pipelines' reorganization

    International Nuclear Information System (INIS)

    Share, J.

    1997-01-01

    The concept behind formation of Enron Transportation and Storage tells plenty about this new gas industry. When executives at the Enron Gas Pipeline Group considered plans last year to streamline operations by merging the support functions of Transwestern Pipeline and their other wholly owned pipeline company, Northern Natural Gas, seamless customer service was foremost on their agenda. Instead of worrying about whether employees would favor one pipeline over the other, perhaps to the detriment of customers, they simply created a new organization that everyone would swear the same allegiance to. The 17,000-mile, 4.1 Bcf/d Northern system serves the upper Midwest market and two major expansion projects were completed there last year. Transwestern is a 2,700-mile system with an eastward capacity of 1 Bcf/d and westward of 1.5 Bcf/, that traditionally served California markets. It also ties into Texas intrastate markets and, thanks to expansion of the San Juan lateral, to southern Rocky Mountain supplies. Although Enron Corp. continues to position itself as a full-service energy company, the Gas Pipeline Group continues to fuel much of corporate's net income, which was $584 million last year. With ET and S comprising a significant portion of GPG's income, it was vital that the merger of Northern's 950 employees with Transwestern's 250 indeed be a seamless one. It was not easy either psychologically or geographically with main offices in Omaha, NE and Houston as well as operations centers in Minneapolis, MN; Amarillo, TX; W. Des Moines, IA; and Albuquerque, NM. But the results have been gratifying, according to William R. Cordes, President of ET and S and Nancy L. Gardner, Executive Vice President of Strategic Initiatives

  4. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  5. Oil pipeline valve automation for spill reduction

    Energy Technology Data Exchange (ETDEWEB)

    Mohitpour, Mo; Trefanenko, Bill [Enbridge Technology Inc, Calgary (Canada); Tolmasquim, Sueli Tiomno; Kossatz, Helmut [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Liquid pipeline codes generally stipulate placement of block valves along liquid transmission pipelines such as on each side of major river crossings where environmental hazards could cause or are foreseen to potentially cause serious consequences. Codes, however, do not stipulate any requirement for block valve spacing for low vapour pressure petroleum transportation, nor for remote pipeline valve operations to reduce spills. A review of pipeline codes for valve requirement and spill limitation in high consequence areas is thus presented along with a criteria for an acceptable spill volume that could be caused by pipeline leak/full rupture. A technique for deciding economically and technically effective pipeline block valve automation for remote operation to reduce oil spilled and control of hazards is also provided. In this review, industry practice is highlighted and application of the criteria for maximum permissible oil spill and the technique for deciding valve automation thus developed, as applied to ORSUB pipeline is presented. ORSUB is one of the three initially selected pipelines that have been studied. These pipelines represent about 14% of the total length of petroleum transmission lines operated by PETROBRAS Transporte S.A. (TRANSPETRO) in Brazil. Based on the implementation of valve motorization on these three pipeline, motorization of block valves for remote operation on the remaining pipelines is intended, depending on the success of these implementations, on historical records of failure and appropriate ranking. (author)

  6. Russia: the pipeline diplomacy; Russie: la diplomatie du pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Bourdillon, Y

    2005-01-15

    First world producer of oil and gas, Russia wishes to use its mastery of energy distribution to recover its great power status. The oil and gas pipelines network is the basement used by Russia to build up its hegemony in Europe. The Russian oil and gas companies are also carrying out a long-term strategy of international expansion, in particular thanks to investments in the neighboring countries for the building of new infrastructures or the purchase of oil refineries. (J.S.)

  7. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  8. Canadian pipeline contractors in holding pattern

    Energy Technology Data Exchange (ETDEWEB)

    Caron, G [Pe Ben Pipelines Ltd.; Osadchuk, V; Sharp, M; Stabback, J G

    1979-05-21

    A discussion of papers presented at a Pipe Line Contractors Association of Canada convention includes comments by G. Caron (Pe Ben Pipelines Ltd.) on the continued slack in big-inch pipeline construction into 1980 owing mainly to delayed U.S. and Canadian decisions on outstanding Alaska Highway gas pipeline issues and associated gas export bids and on the use of automatic welding for expeditious construction of the northern sections of the Alaska Highway pipeline; by V. Osadchuk (Majestic Wiley Contract. Ltd.) on the liquidation of surplus construction equipment because of these delays; by M. Sharp (Can. North. Pipeline Agency) on the need for close U.S. and Canadian governmental and industrial cooperation to permit an early 1980 start for construction of the prebuild sections of the Alaska pipeline; and by J. G. Stabback (Can. Natl. Energy Board) on the Alaska oil pipeline applications by Foothills Pipe Lines Ltd., Trans Mountain Pipe Line Co. Ltd., and Kitimat Pipe Line Ltd.

  9. Pipeline system for gas centrifuge

    International Nuclear Information System (INIS)

    Masumoto, Tsutomu; Umezawa, Sadao.

    1977-01-01

    Purpose: To enable effective operation for the gas centrifuge cascade system upon failures in the system not by interrupting the operation of all of the centrifuges in the system but by excluding only the failed centrifuges. Constitution: A plurality of gas centrifuges are connected by way of a pipeline and an abnormal detector for the automatic detection of abnormality such as destruction in a vacuum barrel and loss of vacuum is provided to each of the centrifuges. Bypass lines for short-circuitting adjacent centrifuges are provided in the pipelines connecting the centrifuges. Upon generation of abnormality in a centrifuge, a valve disposed in the corresponding bypass is automatically closed or opened by a signal from the abnormal detector to change the gas flow to thereby exclude the centrifuge in abnormality out of the system. This enables to effectively operate the system without interrupting the operation for the entire system. (Moriyama, K.)

  10. Oil pipeline performance review, 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This paper reviews the environmental performance of Canadian oil pipelines in spill prevention and control in 1990 and compares it with that in 1989. In 1990, in-service length of the systems reporting increased to 34,907 km. Traffic volume was 235 million m 3 . Failures dropped 16% from 1989 to 36. Equipment failures accounted for 47%, corrosion for 22% and operational error for 19% of the failures. Repair, damage and clean-up costs were considerably higher at $5,302,000, of which one external corrosion failure contributed $4,500,000. The average spill size was 130 m 3 with 72 m 3 recovered for a 55.4% recovery rate. No injuries resulted from the failures. An 11 year statistical summary of oil pipeline performance data is included. 3 figs., 5 tabs

  11. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  12. Shore approach of Camarupim pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Bernardi, Tiaraju P.; Oliveira Neto, Vasco A. de; Siqueira, Jakson [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Camarupim Field is located in the northern portion of Espirito Santo Basin and was discovered from the drilling of the well 1-ESS-164 in 2006. It is a gas field which start of the production is in mid of 2009. The production unit will be a FPSO (Floating Production, Storage and Offloading) and the gas will flow through a pipeline with diameter ranging from 12 inches and 24 inches with approximately 60 km long, from the FPSO Cidade de Sao Mateus to UTGC (Unit for Treatment of Gas Cacimbas-Linhares-ES). The FPSO will have processing capacity of 10MMm3/day of gas. Due to the approach of the pipeline in the continental portion, located in an environmental protection area and place of spawning of sea turtles, the connection between the stretch of sea and land pipeline running through a shore approach, known and proven technique of horizontal directional drilling about 950m in length. This paper will be shown the assumptions adopted, the technique employed, the challenges faced by the team and the lessons learned to build the directional hole. (author)

  13. Development of high productivity pipeline girth welding

    International Nuclear Information System (INIS)

    Yapp, David; Liratzis, Theocharis

    2010-01-01

    The trend for increased oil and gas consumption implies a growth of long-distance pipeline installations. Welding is a critical factor in the installation of pipelines, both onshore and offshore, and the rate at which the pipeline can be laid is generally determined by the speed of welding. This has resulted in substantial developments in pipeline welding techniques. Arc welding is still the dominant process used in practice, and forge welding processes have had limited successful application to date, in spite of large investments in process development. Power beam processes have also been investigated in detail and the latest laser systems now show promise for practical application. In recent years the use of high strength steels has substantially reduced the cost of pipeline installation, with X70 and X80 being commonly used. This use of high strength pipeline produced by thermomechanical processing has also been researched. They must all meet three requirments, high productivity, satisfactory weld properties, and weld quality

  14. Pipelines, inexpensive and safe mode of transport

    Energy Technology Data Exchange (ETDEWEB)

    Grover, D D

    1979-01-01

    Pipelines are the leading bulk commodity transporter and should play an even more important role in the future of energy transportation and distribution. As fossil fuel and low-cost uranium resources become depleted, it will be economical to produce hydrogen by electrolysis and transport it through underground pipelines to points of consumption. The cost would be only two to three times that of transporting natural gas per unit of heat energy and substantially less than the cost of transporting electric energy in overhead, extra-high-voltage transmission lines. Pipeline design, including economic pipe diameter; pipe material; operation by remote control and automation; cathodic protection; pipeline construction; and pipeline maintenance, particularly as regards the 1157 km long Oil India Pipeline, are discussed.

  15. Submarine pipelines and the North Sea environment

    International Nuclear Information System (INIS)

    Haldane, D.; Paul, M.A.; Reuben, R.L.; Side, J.C.

    1992-01-01

    The function and design of pipelines for use on the United Kingdom continental shelf are described. Environmental influences which can threaten the integrity of seabed pipelines in the North Sea include hydrodynamic forces due to residual, tidal and wave currents, the nature of seabed sediments and corrosion by seawater. Damage may be caused to pipelines by interaction with vessel anchors and with fishing gear. Special care has to be taken over the selection of the general area for the landfall of a pipeline and the engineering of the installation where the pipeline comes ashore. Trenching and other protection techniques for pipelines are discussed together with hydrostatic testing and commissioning and subsequent inspection, maintenance and repair. (UK)

  16. Sea water pipeline for nuclear power plant

    International Nuclear Information System (INIS)

    Ueno, Ken-ichi.

    1992-01-01

    Heating coils, for example, are wound around sea water pipelines as a heater. The outer wall surface of the sea water pipelines is heated by the heating coils. The inner wall surfaces of the sea water pipelines can be warmed to higher than a predetermined temperature by heating the outer wall surfaces to die out marine organisms deposited at the inner surfaces. Further, thermocouples for the external wall and the internal wall are disposed so that the temperature at the inner wall surface of the sea water pipelines can be controlled. Further, a temperature keeping material is disposed at the external surface of the sea water system pipelines. With such a constitution, the marine organisms deposited on the internal wall surface of the sea water system pipelines are died out to suppress the deposition amount of the marine organisms. Accordingly, the maintenance and the operation reliability is improved after maintenance. (I.N.)

  17. Development and Applications of Pipeline Steel in Long-Distance Gas Pipeline of China

    Science.gov (United States)

    Chunyong, Huo; Yang, Li; Lingkang, Ji

    In past decades, with widely utilizing of Microalloying and Thermal Mechanical Control Processing (TMCP) technology, the good matching of strength, toughness, plasticity and weldability on pipeline steel has been reached so that oil and gas pipeline has been greatly developed in China to meet the demand of strong domestic consumption of energy. In this paper, development history of pipeline steel and gas pipeline in china is briefly reviewed. The microstructure characteristic and mechanical performance of pipeline steel used in some representative gas pipelines of china built in different stage are summarized. Through the analysis on the evolution of pipeline service environment, some prospective development trend of application of pipeline steel in China is also presented.

  18. Measures for security and supervision of pipelines; Massnahmen zur Pipeline-Sicherheit und -Ueberwachung

    Energy Technology Data Exchange (ETDEWEB)

    Horlacher, Hans-Burkhard [TU Dresden (Germany). Inst. fuer Wasserbau und Technische Hydromechanik; Giesecke, Juergen [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    2010-07-01

    In a previous publication, the two authors dealt with the hydraulic problems as regards mineral oil pipelines. The present report describes the measures mainly used to guarantee the safety of such pipelines. (orig.)

  19. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    Science.gov (United States)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  20. Study of risk in gasoline and diesel transportation pipelines in Mexico; Estudio del riesgo en ductos de transporte de gasolinas y diesel en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Olivera Villasenor, Ruperto Enrique [Universidad Nacional Autonoma Mexico, Mexico D.F. (Mexico); Rodriguez Castellanos, Alejandro [Instituto Mexicano del Petroleo, Mexico D.F. (Mexico)

    2005-10-15

    A methodology of risk operative analysis for damages, which are derived from theft of gasoline in Petroleos Mexicanos (Pemex) pipelines by third parts (clandestine pipes) is proposed. Originally, the problematic is studied from the global perspective of pipelines accidents happened in the world, in United States of America and in Mexico, and later it approaches specifically the environment that the industry of Pemex-Refinery pipelines. When the results are obtained, it is concluded that the factor of risk with more occurrence probability of pipelines, is due to damages for third parts, in first term, and followed by the damages originated by corrosion in second term. So a diagnostic is made of the physical vulnerability degree on the rights of way of Pemex. [Spanish] Se propone una metodologia de analisis de riesgo operativo en poliductos debido a danos por terceras partes (tomas clandestinas), originados del hurto de gasolinas en ductos de Petroleos Mexicanos (Pemex). La problematica se aborda desde una perspectiva global de accidentes en los ductos de Pemex-Refinacion. Del analisis y resultados obtenidos, se concluye que el factor de riesgo con mayor probabilidad de ocurrencia en poliductos, es debido a danos por terceras partes, en primer termino, seguido de los danos originados por corrosion. Asimismo se hace un diagnostico del grado de vulnerabilidad fisica de los derechos de via de Pemex.

  1. Strength analysis of copper gas pipeline span

    OpenAIRE

    Ianevski, Philipp

    2016-01-01

    The purpose of the study was to analyze the stresses in a gas pipeline. While analyzing piping systems located inside building were used. Calculation of the strength of a gas pipeline is done by using information of the thickness of pipe walls, by choosing the suitable material, inner and outer diameter for the pipeline. Data for this thesis was collected through various internet sources and different books. From the study and research, the final results were reached and calculations were ...

  2. Preliminary results from the hierarchical glitch pipeline

    International Nuclear Information System (INIS)

    Mukherjee, Soma

    2007-01-01

    This paper reports on the preliminary results obtained from the hierarchical glitch classification pipeline on LIGO data. The pipeline that has been under construction for the past year is now complete and end-to-end tested. It is ready to generate analysis results on a daily basis. The details of the pipeline, the classification algorithms employed and the results obtained with one days analysis on the gravitational wave and several auxiliary and environmental channels from all three LIGO detectors are discussed

  3. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  4. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  5. Thermal expansion absorbing structure for pipeline

    International Nuclear Information System (INIS)

    Nagata, Takashi; Yamashita, Takuya.

    1995-01-01

    A thermal expansion absorbing structure for a pipeline is disposed to the end of pipelines to form a U-shaped cross section connecting a semi-circular torus shell and a short double-walled cylindrical tube. The U-shaped longitudinal cross-section is deformed in accordance with the shrinking deformation of the pipeline and absorbs thermal expansion. Namely, since the central lines of the outer and inner tubes of the double-walled cylindrical tube deform so as to incline, when the pipeline is deformed by thermal expansion, thermal expansion can be absorbed by a simple configuration thereby enabling to contribute to ensure the safety. Then, the entire length of the pipeline can greatly be shortened by applying it to the pipeline disposed in a high temperature state compared with a method of laying around a pipeline using only elbows, which has been conducted so far. Especially, when it is applied to a pipeline for an FBR-type reactor, the cost for the construction of a facility of a primary systems can greater be reduced. In addition, it can be applied to a pipeline for usual chemical plants and any other structures requiring absorption of deformation. (N.H.)

  6. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  7. Acoustic system for communication in pipelines

    Science.gov (United States)

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  8. Tubular lining material for pipelines having bends

    Energy Technology Data Exchange (ETDEWEB)

    Moringa, A.; Sakaguchi, Y.; Hyodo, M.; Yagi, I.

    1987-03-24

    A tubular lining material for pipelines having bends or curved portions comprises a tubular textile jacket made of warps and wefts woven in a tubular form overlaid with a coating of a flexible synthetic resin. It is applicable onto the inner surface of a pipeline having bends or curved portions in such manner that the tubular lining material with a binder onto the inner surface thereof is inserted into the pipeline and allowed to advance within the pipeline, with or without the aid of a leading rope-like elongated element, while turning the tubular lining material inside out under fluid pressure. In this manner the tubular lining material is applied onto the inner surface of the pipeline with the binder being interposed between the pipeline and the tubular lining material. The lining material is characterized in that a part of all of the warps are comprised of an elastic yarn around which, over the full length thereof, a synthetic fiber yarn or yarns have been left-and/or right-handedly coiled. This tubular lining material is particularly suitable for lining a pipeline having an inner diameter of 25-200 mm and a plurality of bends, such as gas service pipelines or house pipelines, without occurrence of wrinkles in the lining material in a bend.

  9. A quick guide to pipeline engineering

    CERN Document Server

    Alkazraji, D

    2008-01-01

    Pipeline engineering requires an understanding of a wide range of topics. Operators must take into account numerous pipeline codes and standards, calculation approaches, and reference materials in order to make accurate and informed decisions.A Quick Guide to Pipeline Engineering provides concise, easy-to-use, and accessible information on onshore and offshore pipeline engineering. Topics covered include: design; construction; testing; operation and maintenance; and decommissioning.Basic principles are discussed and clear guidance on regulations is provided, in a way that will

  10. East, West German gas pipeline grids linked

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ruhrgas AG, Essen, has started up the first large diameter gas pipeline linking the gas grids of former East and West Germany. Ruhrgas last month placed in service a 40 in., 70 km line at Vitzeroda, near Eisenach, linking a new Ruhrgas pipeline in Hesse state with a 330 km gas pipeline built last year in Thuringia and Saxony states by Erdgasversorgungs GmbH (EVG), Leipzig. The new link enables pipeline operator EVG to receive 70 bcf/year of western European gas via Ruhrgas, complementing the 35 bcf/year of gas coming from the Commonwealth of Independent States via Verbundnetz Gas AG (VNG), Leipzig

  11. 77 FR 6857 - Pipeline Safety: Notice of Public Meetings on Improving Pipeline Leak Detection System...

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... installed to lessen the volume of natural gas and hazardous liquid released during catastrophic pipeline... p.m. Panel 3: Considerations for Natural Gas Pipeline Leak Detection Systems 3:30 p.m. Break 3:45 p...

  12. Contemporary methods of emergency repair works on transit pipelines. Repair works on in-service pipelines

    International Nuclear Information System (INIS)

    Olma, T.; Winckowski, J.

    2007-01-01

    The paper presents modern methods and relevant technologies of pipeline failure repairs, basing on TD Williamson technique for hermetic plugging of gas pipelines without interrupting service. Rules for management of emergency situations on the Polish Section of Yamal - Europe Transit Gas Pipeline are being discussed as well. (author)

  13. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  14. 76 FR 303 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2011-01-04

    ... leak detection requirements for all pipelines; whether to require the installation of emergency flow... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 195 [Docket ID PHMSA-2010-0229] RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid...

  15. Addressing the workforce pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  16. Maritimes and northeast pipeline update

    International Nuclear Information System (INIS)

    Langan, P.

    1998-01-01

    Efforts made by Maritimes and Northeast Pipelines to bring the benefits of natural gas to the Maritime's economy was discussed. Some background on the developments that have brought the company to where they are today and an update on all their activities were presented. These activities and operations are expected to impact and affect the region's economy in a positive way. Particular attention was paid to the company's policy on laterals and the positive effects of that policy on the development of natural gas service and future natural gas distribution business in the Maritimes

  17. Internal corrosion control of northern pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Papavinasam, S.

    2005-02-01

    The general causes of internal corrosion in pipelines were discussed along with the methods to control them. Efficient methods are needed to determine chemical efficiency for mitigating internal corrosion in transmission pipelines, particularly those used in environmentally sensitive regions in the Arctic where harsh environmental conditions prevail. According to the Office of Pipeline Safety, 15 per cent of pipeline failures in the United States from 1994 to 2000 were caused by internal corrosion. Since pipelines in the United States are slightly older than Canadian pipelines, internal corrosion is a significant issue from a Canadian perspective. There are 306,618 km of energy-related pipelines in western Canada. Between April 2001 and March 2002 there were 808 failures, of which 425 failures resulted from internal corrosion. The approach to control internal corrosion comprises of dehydrating the gases at production facilities; controlling the quality of corrosive gases such as carbon dioxide and hydrogen sulphide; and, using internal coatings. The approaches to control internal corrosion are appropriate, when supplemented by adequate integrity management program to ensure that corrosive liquids do not collect, over the operational lifetime of the pipelines, at localized areas. It was suggested that modeling of pipeline operations may need improvement. This paper described the causes, prediction and control of internal pitting corrosion. It was concluded that carbon steel equipment can continue to be used reliably and safely as pipeline materials for northern pipelines if the causes that lead to internal corrosion are scientifically and accurately predicted, and if corrosion inhibitors are properly evaluated and applied. 5 figs.

  18. Reasons for decision in the matter of Enbridge Southern Lights GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. : facilities

    International Nuclear Information System (INIS)

    2008-01-01

    In March 2007, Enbridge Southern Lights (ESL) GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. (EPI) applied for approvals related to the Southern Lights Project. The first component of the project involves the construction of a pipeline to transport diluent from Chicago, Illinois to Edmonton on Line 13, an existing EPI Mainline pipeline. The second component of the project involves a Capacity Replacement Project to replace the loss of southbound capacity on the EPI Mainline system resulting from the transfer of Line 13 to diluent service. The application required Board approvals for several related project components, including the transfer of ownership of EPI's Line 13 to ESL; the removal of Line 13 from southbound crude oil delivery service; reversing the flow on Line 13 to carry diluent from the Canada/US border northbound to Edmonton, Alberta; constructing a new oil pipeline to transport light sour crude oil; physical changes and alterations to EPI's Line 2; and, appropriate tolls and tariffs. The Board determined that the Southern Lights Project is an innovative and cost-effective solution to transport diluent. The applicants demonstrated sufficient diluent shipping commitments to ensure the long term viability of the pipeline. The Board found that the proposal to build new facilities on existing EPI sites and right-of-way should minimize negative impacts on area landowners, and also judged that mitigation planned for the construction phase will minimize potential adverse effects. The Board will require ESL to conduct an emergency response exercise where Line 13 crosses the South Saskatchewan River. Ongoing discussions between the applicants and Aboriginal groups, and a Heritage Resource Discovery Contingency Plan, will reduce potential impacts to traditional use sites. Having reviewed all evidence, the Board approved applications for the Southern Lights Pipeline Project, worth an estimated $247.5 million in Canadian spending. 2 tabs

  19. 78 FR 24309 - Pipeline and Hazardous Materials Safety Administration

    Science.gov (United States)

    2013-04-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration List of Special Permit Applications Delayed AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...

  20. Oil and Natural Gas Pipelines, North America, 2010, Platts

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Oil and Natural Gas Pipeline geospatial data layer contains gathering, interstate, and intrastate natural gas pipelines, crude and product oil pipelines, and...

  1. 75 FR 32836 - Pipeline Safety: Workshop on Public Awareness Programs

    Science.gov (United States)

    2010-06-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... American Public Gas Association Association of Oil Pipelines American Petroleum Institute Interstate... the pipeline industry). Hazardous Liquid Gas Transmission/Gathering Natural Gas Distribution (10...

  2. 75 FR 67807 - Pipeline Safety: Emergency Preparedness Communications

    Science.gov (United States)

    2010-11-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities... Gas Pipeline Systems. Subject: Emergency Preparedness Communications. Advisory: To further enhance the...

  3. 76 FR 65778 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-10-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: 12,120. Frequency of Collection: On occasion. 2. Title: Recordkeeping for Natural Gas Pipeline... investigating incidents. Affected Public: Operators of natural gas pipeline systems. Annual Reporting and...

  4. 75 FR 13807 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200 New Jersey Avenue, SE...: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements (One Rule). The Notice of Proposed...

  5. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public.... Background Federal regulations for gas, liquefied natural gas (LNG), and hazardous liquid pipeline facilities...

  6. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... notice provides clarification to owners and operators of gas distribution pipeline facilities when... of a gas distribution pipeline facility to file a written report for any mechanical fitting failure...

  7. Electrical fingerprint of pipeline defects

    International Nuclear Information System (INIS)

    Mica, Isabella; Polignano, Maria Luisa; Marco, Cinzia De

    2004-01-01

    Pipeline defects are dislocations that connect the source region of the transistor with the drain region. They were widely reported to occur in CMOS, BiCMOS devices and recently in SOI technologies. They can reduce device yield either by affecting the devices functionality or by increasing the current consumption under stand-by conditions. In this work the electrical fingerprint of these dislocations is studied, its purpose is to enable us to identify these defects as the ones responsible for device failure. It is shown that the pipeline defects are responsible for a leakage current from source to drain in the transistors. This leakage has a resistive characteristic and it is lightly modulated by the body bias. It is not sensitive to temperature; vice versa the off-current of a good transistor exhibits the well-known exponential dependence on 1/T. The emission spectrum of these defects was studied and compared with the spectrum of a good transistor. The paper aims to show that the spectrum of a defective transistor is quite peculiar; it shows well defined peaks, whereas the spectrum of a good transistor under saturation conditions is characterized by a broad spectral light emission distribution. Finally the deep-level transient spectroscopy (DLTS) is tried on defective diodes

  8. System reliability of corroding pipelines

    International Nuclear Information System (INIS)

    Zhou Wenxing

    2010-01-01

    A methodology is presented in this paper to evaluate the time-dependent system reliability of a pipeline segment that contains multiple active corrosion defects and is subjected to stochastic internal pressure loading. The pipeline segment is modeled as a series system with three distinctive failure modes due to corrosion, namely small leak, large leak and rupture. The internal pressure is characterized as a simple discrete stochastic process that consists of a sequence of independent and identically distributed random variables each acting over a period of one year. The magnitude of a given sequence follows the annual maximum pressure distribution. The methodology is illustrated through a hypothetical example. Furthermore, the impact of the spatial variability of the pressure loading and pipe resistances associated with different defects on the system reliability is investigated. The analysis results suggest that the spatial variability of pipe properties has a negligible impact on the system reliability. On the other hand, the spatial variability of the internal pressure, initial defect sizes and defect growth rates can have a significant impact on the system reliability.

  9. Increase of ecological safety of the pipeline

    International Nuclear Information System (INIS)

    Dr Movsumov, Sh.N.; Prof Aliyev, F.G.

    2005-01-01

    Full text : For increase of ecological safety of the pipeline, necessary decrease of damage (risk) rendered by the pipeline on surrounding natural environment which depends: on the frequency of damage of the pipeline; on the volume poured oil; on the factor of sensitivity of an environment where flood of oil was. Frequency of damage of the pipeline depends on physico-chemical properties of a material of the pipeline, from its technical characteristics (thickness of a wall, length of a pipe, working pressure), on the seismic area of the district where the pipeline passed and also on the way of lining of the pipeline (underground or overground). The volume poured oil depends on diameter of the received damage, from stability of the pipeline mechanical and other external actions, from an ambient temperature, from capacity of the pipeline, from distance between the latches established in the pipeline, and also from time, necessary for their full closing. The factor of sensitivity of environment depends on geological structure and landscapes of district (mountain, the river, settlements) where passed the pipeline. At designing the pipeline, in report is shown questions of increase of ecological safety of the pipeline are considered at his construction and exploitation. For improvement of ecological safety of the pipeline is necessary to hold the following actions: Ecological education of the public, living near along a line of the oil pipeline; carrying out ecological monitoring; working of the public plan of response to oil spills; For ecological education of the public is necessary: carrying out informing of the public for all (technical, ecological, social and economic and legal) questions connected to an oil pipeline, and also on methods of protection of the rights at participation in acceptance of ecological significant decisions; Creation of public groups for realization of activity on observance of the legislation and to prevention of risks; Exposure of hot

  10. Assessing the potential to sequester carbon within state highway rights-of-way in New Mexico phase 2: development of a right-of-way carbon sequestration program.

    Science.gov (United States)

    2016-06-13

    The New Mexico Department of Transportation (NMDOT) was selected by the Federal Highway : Administration (FHWA) to determine the feasibility of maximizing carbon sequestration within state : highway rightsofway (ROW). Golder Associates Inc. was...

  11. Dynamic pressure measures for long pipeline leak detection

    Energy Technology Data Exchange (ETDEWEB)

    Likun Wang; Hongchao Wang; Min Xiong; Bin Xu; Dongjie Tan; Hengzhang Zhou [PetroChina Pipeline Company, Langfang (China). R and D Center

    2009-07-01

    Pipeline leak detection method based on dynamic pressure is studied. The feature of dynamic pressure which is generated by the leakage of pipeline is analyzed. The dynamic pressure method is compared with the static pressure method for the advantages and disadvantages in pipeline leak detection. The dynamic pressure signal is suitable for pipeline leak detection for quick-change of pipeline internal pressure. Field tests show that the dynamic pressure method detects pipeline leak rapidly and precisely. (author)

  12. Best practices for the abandonment of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mackean, M; Reed, R; Snow, B [Nabors Canada, Calgary, AB (Canada). Abandonrite Service

    2006-07-01

    Pipeline regulations implemented in 2006 require that licensees register all pipelines. Training must also be provided for ground disturbance supervisors. In addition, signage must be maintained on abandoned pipelines, and discontinued pipelines must be properly isolated. Corrosion control and internal inhibition is required for discontinued lines. However, pipelines are often neglected during the well abandonment process. This presentation provided recommendations for coordinating well and pipeline abandonment processes. Pipeline ends can be located, depressurized, flushed and purged while wells are being abandoned. Contaminated soils around the wells can also be identified prior to reclamation activities. Administrative reviews must be conducted in order to provide accurate information on pipeline location, reclamation certification, and line break history. Field operation files must be reviewed before preliminary field work is conducted. Site inspections should be used to determine if all ends of the line are accessible. Landowners and occupants near the line must also be notified, and relevant documentation must be obtained. Skilled technicians must be used to assess the lines for obstructions as well as to cut and cap the lines after removing risers. The presentation also examined issues related to pressure change, movement, cold tapping, and live dead legs. tabs., figs.

  13. Canadian pipeline transportation system : transportation assessment

    International Nuclear Information System (INIS)

    2009-07-01

    In addition to regulating the construction and operation of 70,000 km of oil and natural gas pipelines in Canada, the National Energy Board (NEB) regulates the trade of natural gas, oil and natural gas liquids. This report provided an assessment of the Canadian hydrocarbon transportation system in relation to its ability to provide a robust energy infrastructure. Data was collected from NEB-regulated pipeline companies and a range of publicly available sources to determine if adequate pipeline capacity is in place to transport products to consumers. The NEB also used throughput and capacity information received from pipeline operators as well as members of the investment community. The study examined price differentials compared with firm service tolls for transportation paths, as well as capacity utilization on pipelines and the degree of apportionment on major oil pipelines. This review indicated that in general, the Canadian pipeline transportation system continues to work effectively, with adequate pipeline capacity in place to move products to consumers who need them. 9 tabs., 30 figs., 3 appendices.

  14. The MIRI Medium Resolution Spectrometer calibration pipeline

    NARCIS (Netherlands)

    Labiano, A.; Azzollini, R.; Bailey, J.; Beard, S.; Dicken, D.; García-Marín, M.; Geers, V.; Glasse, A.; Glauser, A.; Gordon, K.; Justtanont, K.; Klaassen, P.; Lahuis, F.; Law, D.; Morrison, J.; Müller, M.; Rieke, G.; Vandenbussche, B.; Wright, G.

    2016-01-01

    The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer (MRS) is the only mid-IR Integral Field Spectrometer on board James Webb Space Telescope. The complexity of the MRS requires a very specialized pipeline, with some specific steps not present in other pipelines of JWST instruments,

  15. Oil pipeline energy consumption and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Hooker, J.N.

    1981-01-01

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movements over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.

  16. Testing the School-to-Prison Pipeline

    Science.gov (United States)

    Owens, Emily G.

    2017-01-01

    The School-to-Prison Pipeline is a social phenomenon where students become formally involved with the criminal justice system as a result of school policies that use law enforcement, rather than discipline, to address behavioral problems. A potentially important part of the School-to-Prison Pipeline is the use of sworn School Resource Officers…

  17. Generating pipeline networks for corrosion assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, J. [Cimarron Engineering Ltd., Calgary, AB (Canada)

    2008-07-01

    Production characteristics and gas-fluid compositions of fluids must be known in order to assess pipelines for internal corrosion risk. In this study, a gathering system pipeline network was built in order to determine corrosion risk for gathering system pipelines. Connections were established between feeder and collector lines in order measure upstream production and the weighted average of the upstream composition of each pipeline in the system. A Norsok M-506 carbon dioxide (CO{sub 2}) corrosion rate model was used to calculate corrosion rates. A spreadsheet was then used to tabulate the obtained data. The analysis used straight lines drawn between the 'from' and 'to' legal sub-division (LSD) endpoints in order to represent pipelines on an Alberta township system (ATS) and identify connections between pipelines. Well connections were established based on matching surface hole location and 'from' LSDs. Well production, composition, pressure, and temperature data were sourced and recorded as well attributes. XSL hierarchical computations were used to determine the production and composition properties of the commingled inflows. It was concluded that the corrosion assessment process can identify locations within the pipeline network where potential deadlegs branched off from flowing pipelines. 4 refs., 2 tabs., 2 figs.

  18. Analysis of buried pipelines at Kozloduy

    International Nuclear Information System (INIS)

    Asfura, A.

    1999-01-01

    This paper describes the analysis of the buried pipelines at Kozloduy NPP. It involves the description of the studied pipelines, their properties, a detailed description of the methodology applied, and the evaluation of the soil strain field as well as the graphical representation of the results obtained

  19. The LOFAR Known Pulsar Data Pipeline

    NARCIS (Netherlands)

    Alexov, A.; Hessels, J.W.T.; Mol, J.D.; Stappers, B.; van Leeuwen, J.

    2010-01-01

    Abstract: Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being

  20. Repairing method for reactor primary system pipeline

    International Nuclear Information System (INIS)

    Hosokawa, Hideyuki; Uetake, Naoto; Hara, Teruo.

    1997-01-01

    Pipelines after decontamination of radioactive nuclides deposited on the pipelines in a nuclear power plant during operation or pipelines to replace pipelines deposited with radioactive nuclide are connected to each system of the nuclear power plant. They are heated in a gas phase containing oxygen to form an oxide film on the surface of the pipelines. The thickness of the oxide film formed in the gas phase is 1nm or greater, preferably 100nm. The concentration of oxygen in the gas phase containing oxygen must be 0.1% or greater. The heating is conducted by circulating a heated gas to the inside of the pipelines or disposing a movable heater such as a high frequency induction heater inside of the pipelines to form the oxide film. Then, redeposition of radioactive nuclide can be suppressed and since the oxide film is formed in the gas phase, a large scaled facilities are not necessary, thereby enabling to repair pipelines of reactor primary system at low cost. (N.H.)

  1. Protection of pipelines affected by surface subsidence

    International Nuclear Information System (INIS)

    Luo, Y.; Peng, S.S.; Chen, H.J.

    1998-01-01

    Surface subsidence resulting from underground coal mining can cause problems for buried pipelines. A technique for assessing the level of stress on a subsidence-affected pipeline is introduced. The main contributors to the stress are identified, and mitigation techniques for reducing the stress are proposed. The proposed mitigation techniques were then successfully tested. 13 refs., 8 figs., 2 tabs

  2. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_vectors_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the lines of the pipeline in the GOM. All pipelines existing in the databases...

  3. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_points_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the points of the pipeline in the GOM. All pipelines existing in the databases...

  4. Pipeline monitoring with unmanned aerial vehicles

    Science.gov (United States)

    Kochetkova, L. I.

    2018-05-01

    Pipeline leakage during transportation of combustible substances leads to explosion and fire thus causing death of people and destruction of production and accommodation facilities. Continuous pipeline monitoring allows identifying leaks in due time and quickly taking measures for their elimination. The paper describes the solution of identification of pipeline leakage using unmanned aerial vehicles. It is recommended to apply the spectral analysis with input RGB signal to identify pipeline damages. The application of multi-zone digital images allows defining potential spill of oil hydrocarbons as well as possible soil pollution. The method of multi-temporal digital images within the visible region makes it possible to define changes in soil morphology for its subsequent analysis. The given solution is cost efficient and reliable thus allowing reducing timing and labor resources in comparison with other methods of pipeline monitoring.

  5. optimization for trenchless reconstruction of pipelines

    Directory of Open Access Journals (Sweden)

    Zhmakov Gennadiy Nikolaevich

    2015-01-01

    Full Text Available Today the technologies of trenchless reconstruction of pipelines are becoming and more widely used in Russia and abroad. One of the most perspective is methods is shock-free destruction of the old pipeline being replaced with the help of hydraulic installations with working mechanism representing a cutting unit with knife disks and a conic expander. A construction of a working mechanism, which allows making trenchless reconstruction of pipelines of different diameters, is optimized and patented and its developmental prototype is manufactured. The dependence of pipeline cutting force from knifes obtusion of the working mechanisms. The cutting force of old steel pipelines with obtuse knife increases proportional to the value of its obtusion. Two stands for endurance tests of the knifes in laboratory environment are offered and patented.

  6. Crude oil growth impact on pipelines

    International Nuclear Information System (INIS)

    Devries, O.

    2005-01-01

    This paper provided an outline of crude oil production and supply in Canada. Details of oil sands projects in Athabasca, Cold Lake and Peace River were presented. A chart of oil sands growth by major project was provided. A list of new emerging oil sands crude types was also presented along with details of a synthetic bitumen blending synergy. Maps of Western Canadian crude oil markets were provided, along with details of refinery and market demand by crude type. Various pipeline alternatives to new markets were examined, with reference to Enbridge Pipeline's supply and capacity. Details of the Hardisty to U.S Gulf Coast Pipeline and the Edmonton to Prince Rupert Pipeline and its terminal and dock facilities were presented. It was concluded that pipeline capacity and seasonal factors will influence market demand, while linefill, crude types and the quality of the product will influence operational strategies. tabs., figs

  7. Efficiency improvements in pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.; Horton, J. F.

    1977-09-09

    This report identifies potential energy-conservative pipeline innovations that are most energy- and cost-effective and formulates recommendations for the R, D, and D programs needed to exploit those opportunities. From a candidate field of over twenty classes of efficiency improvements, eight systems are recommended for pursuit. Most of these possess two highly important attributes: large potential energy savings and broad applicability outside the pipeline industry. The R, D, and D program for each improvement and the recommended immediate next step are described. The eight technologies recommended for R, D, and D are gas-fired combined cycle compressor station; internally cooled internal combustion engine; methanol-coal slurry pipeline; methanol-coal slurry-fired and coal-fired engines; indirect-fired coal-burning combined-cycle pump station; fuel-cell pump station; drag-reducing additives in liquid pipelines; and internal coatings in pipelines.

  8. Pipeline modeling and assessment in unstable slopes

    Energy Technology Data Exchange (ETDEWEB)

    Caceres, Carlos Nieves [Oleoducto Central S.A., Bogota, Cundinamarca (Colombia); Ordonez, Mauricio Pereira [SOLSIN S.A.S, Bogota, Cundinamarca (Colombia)

    2010-07-01

    The OCENSA pipeline system is vulnerable to geotechnical problems such as faults, landslides or creeping slopes, which are well-known in the Andes Mountains and tropical countries like Colombia. This paper proposes a methodology to evaluate the pipe behaviour during the soil displacements of slow landslides. Three different cases of analysis are examined, according to site characteristics. The process starts with a simplified analytical model and develops into 3D finite element numerical simulations applied to the on-site geometry of soil and pipe. Case 1 should be used when the unstable site is subject to landslides impacting significant lengths of pipeline, pipeline is straight, and landslide is simple from the geotechnical perspective. Case 2 should be used when pipeline is straight and landslide is complex (creeping slopes and non-conventional stabilization solutions). Case 3 should be used if the pipeline presents vertical or horizontal bends.

  9. Location of leaks in pressurized underground pipelines

    International Nuclear Information System (INIS)

    Eckert, E.G.; Maresca, J.W. Jr.

    1993-01-01

    Millions of underground storage tanks (UST) are used to store petroleum and other chemicals. The pressurized underground pipelines associated with USTs containing petroleum motor fuels are typically 2 in. in diameter and 50 to 200 ft in length. These pipelines typically operate at pressures of 20 to 30 psi. Longer lines, with diameters up to 4 in., are found in some high-volume facilities. There are many systems that can be used to detect leaks in pressurized underground pipelines. When a leak is detected, the first step in the remediation process is to find its location. Passive-acoustic measurements, combined with advanced signal-processing techniques, provide a nondestructive method of leak location that is accurate and relatively simple, and that can be applied to a wide variety of pipelines and pipeline products

  10. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  11. The Very Large Array Data Processing Pipeline

    Science.gov (United States)

    Kent, Brian R.; Masters, Joseph S.; Chandler, Claire J.; Davis, Lindsey E.; Kern, Jeffrey S.; Ott, Juergen; Schinzel, Frank K.; Medlin, Drew; Muders, Dirk; Williams, Stewart; Geers, Vincent C.; Momjian, Emmanuel; Butler, Bryan J.; Nakazato, Takeshi; Sugimoto, Kanako

    2018-01-01

    We present the VLA Pipeline, software that is part of the larger pipeline processing framework used for the Karl G. Jansky Very Large Array (VLA), and Atacama Large Millimeter/sub-millimeter Array (ALMA) for both interferometric and single dish observations.Through a collection of base code jointly used by the VLA and ALMA, the pipeline builds a hierarchy of classes to execute individual atomic pipeline tasks within the Common Astronomy Software Applications (CASA) package. Each pipeline task contains heuristics designed by the team to actively decide the best processing path and execution parameters for calibration and imaging. The pipeline code is developed and written in Python and uses a "context" structure for tracking the heuristic decisions and processing results. The pipeline "weblog" acts as the user interface in verifying the quality assurance of each calibration and imaging stage. The majority of VLA scheduling blocks above 1 GHz are now processed with the standard continuum recipe of the pipeline and offer a calibrated measurement set as a basic data product to observatory users. In addition, the pipeline is used for processing data from the VLA Sky Survey (VLASS), a seven year community-driven endeavor started in September 2017 to survey the entire sky down to a declination of -40 degrees at S-band (2-4 GHz). This 5500 hour next-generation large radio survey will explore the time and spectral domains, relying on pipeline processing to generate calibrated measurement sets, polarimetry, and imaging data products that are available to the astronomical community with no proprietary period. Here we present an overview of the pipeline design philosophy, heuristics, and calibration and imaging results produced by the pipeline. Future development will include the testing of spectral line recipes, low signal-to-noise heuristics, and serving as a testing platform for science ready data products.The pipeline is developed as part of the CASA software package by an

  12. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    Energy Technology Data Exchange (ETDEWEB)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes

  13. Calibration pipeline for VIR data

    Science.gov (United States)

    Carraro, F.; Fonte, S.; Coradini, A.; Filacchione, G.; de Sanctis, M. C.; Ammannito, E.; Capria, M. T.; Cartacci, M.; Noschese, R.; Tosi, F.; Capaccioni, F.

    2011-10-01

    During the second quarter of 2011 VIR-MS (VIS and IR Mapping Spectrometer) [1] aboard Dawn mission [2] has approached Vesta in order to start a long period of acquisitions that will end at the beginning of 2012. Data acquired by each instrument always require a calibration process in order to remove all the instrument effects that could affect the scientific evaluations and analysis. VIR-MS instrument team has realized a calibration pipeline which has the goal of producing calibrated (1b level) data starting from the raw (1a level) ones. The other goal of the tool has been the check of the goodness of acquired data by means of the evaluation of a series of minimum requisites of each data file, such as the percentage of the saturated pixels, the presence of spikes or the mean S/N ratio of each qube.

  14. Northeast market view : Millennium Pipeline

    International Nuclear Information System (INIS)

    Pentzien, D.C.

    1998-01-01

    The potential for growth in the U.S. northeast natural gas markets was discussed. In presenting a forecast for natural gas consumption, the growth in demand was attributed primarily to the planned conversion of coal and oil-fired electric generation plants to gas-fired ones, combined with nuclear plant shutdowns, and more stringent environmental policies. An overview of the development of the Millennium Pipeline bringing natural gas from the Alberta border all the way to New York City was also provided, with an update on the current status of the project. Assuming no unreasonable delays in the present schedule, the line should be in service sometime in the year 2000. figs

  15. U.S. interstate pipelines ran more efficiently in 1994

    International Nuclear Information System (INIS)

    True, W.R.

    1995-01-01

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies

  16. Current pipelines for neglected diseases.

    Science.gov (United States)

    di Procolo, Paolo; Jommi, Claudio

    2014-09-01

    This paper scrutinises pipelines for Neglected Diseases (NDs), through freely accessible and at-least-weekly updated trials databases. It updates to 2012 data provided by recent publications, and integrates these analyses with information on location of trials coordinators and patients recruitment status. Additionally, it provides (i) disease-specific information to better understand the rational of investments in NDs, (ii) yearly data, to understand the investment trends. The search identified 650 clinical studies. Leishmaniasis, Arbovirus infection, and Dengue are the top three diseases by number of clinical studies. Disease diffusion risk seems to be the most important driver of the clinical trials target choice, whereas the role played by disease prevalence and unmet need is controversial. Number of trials is stable between 2005 and 2010, with an increase in the last two years. Patient recruitment was completed for most studies (57.6%), and Phases II and III account for 35% and 28% of trials, respectively. The primary purpose of clinical investigations is prevention (49.3%), especially for infectious diseases with mosquitoes and sand flies as the vector, and treatment (43.2%), which is the primary target for parasitic diseases Research centres and public organisations are the most important clinical studies sponsors (58.9%), followed by the pharmaceutical industry (24.1%), foundations and non-governmental organisations (9.3%). Many coordinator centres are located in less affluent countries (43.7%), whereas OECD countries and BRICS account for 34.7% and 17.5% of trials, respectively. Information was partially missing for some parameters. Notwithstanding, and despite its descriptive nature, this research has enhanced the evidence of the literature on pipelines for NDs. Future contributions may further investigate whether trials metrics are consistent with the characteristics of the interested countries and the explicative variables of trials location, target

  17. Efeitos do Kinesio Taping no Desporto

    OpenAIRE

    Pereira, Marcelo

    2012-01-01

    Trabalho apresentado à Universidade Fernando Pessoa como parte dos requisitos para obtenção do grau de Licenciado em Fisioterapia O médico japonês, Dr. Kenzo Kase criou, em 1973, o kinesio taping, uma nova aplicação de ligadura adesiva, tendo como objectivo melhorar a função da musculatura, sem limitar os movimentos, reduzir a dor, edema e os espasmos musculares. Parece ter também a capacidade de prevenir lesões no desporto, sendo por isso uma técnica comummente utilizada para este efeito....

  18. REFRIGERAÇÃO UTILIZANDO PASTILHAS DE EFEITO PELTIER

    Directory of Open Access Journals (Sweden)

    Antonio Luiz P. S. Campos

    2010-06-01

    Full Text Available Pastilhas de Peltier são dispositivos baseados no efeito Peltier e são aplicadas para produzir efeito refrigerador ou aquecedor. Este trabalho aborda conceitos envolvidos na fabricação e funcionamento desses dispositivos tais como: histórico do efeito Peltier e desenvolvimento de placas de efeito Peltier. É feito um estudo de eficiência da refrigeração de água utilizando uma placa de efeito Peltier existente no Campus Natal – Zona Norte. Para isso, é implementada uma estrutura de refrigeração de água e são feitas medições para determinar a eficiência de sistema. Por fim, são apresentadas conclusões sobre o estudo desenvolvido.

  19. Reasons for decision in the matter of Enbridge Southern Lights GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. : facilities[Application dated 9 March 2007 for the Southern Lights Project consisting of the: 1. Diluent Pipeline Project, and 2. Capacity Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-02-15

    In March 2007, Enbridge Southern Lights (ESL) GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. (EPI) applied for approvals related to the Southern Lights Project. The first component of the project involves the construction of a pipeline to transport diluent from Chicago, Illinois to Edmonton on Line 13, an existing EPI Mainline pipeline. The second component of the project involves a Capacity Replacement Project to replace the loss of southbound capacity on the EPI Mainline system resulting from the transfer of Line 13 to diluent service. The application required Board approvals for several related project components, including the transfer of ownership of EPI's Line 13 to ESL; the removal of Line 13 from southbound crude oil delivery service; reversing the flow on Line 13 to carry diluent from the Canada/US border northbound to Edmonton, Alberta; constructing a new oil pipeline to transport light sour crude oil; physical changes and alterations to EPI's Line 2; and, appropriate tolls and tariffs. The Board determined that the Southern Lights Project is an innovative and cost-effective solution to transport diluent. The applicants demonstrated sufficient diluent shipping commitments to ensure the long term viability of the pipeline. The Board found that the proposal to build new facilities on existing EPI sites and right-of-way should minimize negative impacts on area landowners, and also judged that mitigation planned for the construction phase will minimize potential adverse effects. The Board will require ESL to conduct an emergency response exercise where Line 13 crosses the South Saskatchewan River. Ongoing discussions between the applicants and Aboriginal groups, and a Heritage Resource Discovery Contingency Plan, will reduce potential impacts to traditional use sites. Having reviewed all evidence, the Board approved applications for the Southern Lights Pipeline Project, worth an estimated $247.5 million in Canadian spending

  20. Flooding simulation of hilly pipeline commisionning process

    Energy Technology Data Exchange (ETDEWEB)

    Nan, Zhang [China National Oil and Gas Exploration and Development Corporation and China University of Petroleum, Beijing (China); Jing, Gong [China University of Petroleum, Beijing (China); Baoli, Zhu [China National Oil and Gas Exploration and Development Corporation, Beijing (China); Lin, Zheng [CNPC Oil and Gas Control Center, Beijing (China)

    2010-07-01

    When the construction of a pipeline has been completed, the pipeline flooding is done as part of the pipeline commissioning process. This method consists of filling the empty pipe with water or oil. In a pipeline situated in hilly terrain, air entrapped in the fluid causes problems with the flooding process and it is necessary to discharge the accumulated air to address this issue. The aim of this paper is to provide a model for predicting the location and volume of air pockets in a pipeline. This model was developed based on the fundamentals of mass balance and momentum transfer in multiphase flow and was then applied to a pipeline in China and compared with the SCADA data. Results showed a good match between the model's predictions of hydraulic movement and the real data from SCADA. The two flow model developed can predict hydraulic movement during pipeline flooding in a hilly area and thus it can be used to predict water front location and air pocket movement in the pipe.

  1. Optimal hub location in pipeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Dott, D.R.; Wirasinghe, S.C.; Chakma, A. [Univ. of Calgary, Alberta (Canada)

    1996-12-31

    This paper discusses optimization strategies and techniques for the location of natural gas marketing hubs in the North American gas pipeline network. A hub is a facility at which inbound and outbound network links meet and freight is redirected towards their destinations. Common examples of hubs used in the gas pipeline industry include gas plants, interconnects and market centers. Characteristics of the gas pipeline industry which are relevant to the optimization of transportation costs using hubs are presented. Allocation techniques for solving location-allocation problems are discussed. An outline of the research in process by the authors in the field of optimal gas hub location concludes the paper.

  2. Prospects for coal slurry pipelines in California

    Science.gov (United States)

    Lynch, J. F.

    1978-01-01

    The coal slurry pipeline segment of the transport industry is emerging in the United States. If accepted it will play a vital role in meeting America's urgent energy requirements without public subsidy, tax relief, or federal grants. It is proven technology, ideally suited for transport of an abundant energy resource over thousands of miles to energy short industrial centers and at more than competitive costs. Briefly discussed are the following: (1) history of pipelines; (2) California market potential; (3) slurry technology; (4) environmental benefits; (5) market competition; and (6) a proposed pipeline.

  3. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  4. ARTIP: Automated Radio Telescope Image Processing Pipeline

    Science.gov (United States)

    Sharma, Ravi; Gyanchandani, Dolly; Kulkarni, Sarang; Gupta, Neeraj; Pathak, Vineet; Pande, Arti; Joshi, Unmesh

    2018-02-01

    The Automated Radio Telescope Image Processing Pipeline (ARTIP) automates the entire process of flagging, calibrating, and imaging for radio-interferometric data. ARTIP starts with raw data, i.e. a measurement set and goes through multiple stages, such as flux calibration, bandpass calibration, phase calibration, and imaging to generate continuum and spectral line images. Each stage can also be run independently. The pipeline provides continuous feedback to the user through various messages, charts and logs. It is written using standard python libraries and the CASA package. The pipeline can deal with datasets with multiple spectral windows and also multiple target sources which may have arbitrary combinations of flux/bandpass/phase calibrators.

  5. Basic Block of Pipelined ADC Design Requirements

    Directory of Open Access Journals (Sweden)

    V. Kledrowetz

    2011-04-01

    Full Text Available The paper describes design requirements of a basic stage (called MDAC - Multiplying Digital-to- Analog Converter of a pipelined ADC. There exist error sources such as finite DC gain of opamp, capacitor mismatch, thermal noise, etc., arising when the switched capacitor (SC technique and CMOS technology are used. These non-idealities are explained and their influences on overall parameters of a pipelined ADC are studied. The pipelined ADC including non-idealities was modeled in MATLAB - Simulink simulation environment.

  6. Ecological effects of pipeline construction through deciduous forested wetlands, Midland County, Michigan. Topical report, October 1990--August 1992

    Energy Technology Data Exchange (ETDEWEB)

    Rastorfer, J.R. [Chicago State Univ., IL (United States). Dept. of Biological Sciences; Van Dyke, G.D.; Zellmer, S.D.; Wilkey, P.L. [Argonne National Lab., IL (United States)

    1995-04-01

    This study is designed to record vegetational changes induced by the construction of a large-diameter gas pipeline through deciduous forested wetlands. Two second-growth wetland sites mapped Lenawee soils were selected in Midland County, Michigan: Site 1, a younger stand subjected to recent selective logging, and Site 2, a more mature stand. The collection of ecological data to analyze plant succession on the right-of-way (ROW) and the effects of the developing ROW plant communities on adjacent forest communities was initiated in 1989. Cover class estimates were made for understory and ROW plant species on the basis of 1 {times} 1{minus}m quadrats. Individual stem diameters and species counts were recorded for overstory plants in 10{minus}m quadrats. Although long-term studies have not been completed, firm baseline data were established for comparative analyses with future sampling. Current data indicate that vegetation became well-established on the ROW within one year and subsequently increased in coverage. About 65% of the species were wetland indicators, and the dominants included seeded and natural invading species; nevertheless, some elements of the original flora regenerated and persist. The plants of the ecotone understories of both sites changed from their original composition as a result of the installation of the gas pipeline. Although some forest species persist at both sites, the ecotone of Site I was influenced more by the seeded species, whereas the natural invaders were more important at Site 2.

  7. Knowledge Pipeline: A Task Oriented Way to Implement Knowledge Management

    International Nuclear Information System (INIS)

    Pan Jiajie

    2014-01-01

    Concept of knowledge pipeline: There are many pipelines named by tasks or business processes in an organization. Knowledge contributors put knowledge to its corresponding pipelines. A maintenance team could keep the knowledge in pipelines clear and valid. Users could get knowledge just like opening a faucet in terms of their tasks or business processes

  8. 49 CFR 192.627 - Tapping pipelines under pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.627 Tapping pipelines under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to make...

  9. 76 FR 21423 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-04-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0063] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... application is for two 30-inch segments, segments 3 and 4, of the TPL 330 natural gas pipeline located in St...

  10. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  11. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  12. 77 FR 26822 - Pipeline Safety: Verification of Records

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0068] Pipeline Safety: Verification of Records AGENCY: Pipeline and Hazardous Materials... issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify...

  13. 75 FR 73160 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-11-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...-Related Conditions on Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas... Pipelines and Liquefied Natural Gas Facilities.'' The Pipeline Safety Laws (49 U.S.C. 60132) require each...

  14. 75 FR 9018 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2010-02-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2010-0034] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  15. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  16. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  17. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0112] Pipeline Safety: Requests for Special Permit AGENCY: Pipeline and Hazardous Materials... BreitBurn Energy Company LP, two natural gas pipeline operators, seeking relief from compliance with...

  18. 78 FR 14877 - Pipeline Safety: Incident and Accident Reports

    Science.gov (United States)

    2013-03-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2013-0028] Pipeline Safety: Incident and Accident Reports AGENCY: Pipeline and Hazardous Materials... PHMSA F 7100.2--Incident Report--Natural and Other Gas Transmission and Gathering Pipeline Systems and...

  19. 78 FR 65429 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0041] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials...-0041 Williams Gas Pipeline 49 CFR 192.150........ To authorize the extension Company, LLC (WGP). of a...

  20. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  1. Pipelines in Louisiana, Geographic NAD83, USGS (1999) [pipelines_la_usgs_1999

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset contains vector line map information of various pipelines throughout the State of Louisiana. The vector data contain selected base categories of...

  2. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1998-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  3. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  4. A Novel Method to Enhance Pipeline Trajectory Determination Using Pipeline Junctions.

    Science.gov (United States)

    Sahli, Hussein; El-Sheimy, Naser

    2016-04-21

    Pipeline inspection gauges (pigs) have been used for many years to perform various maintenance operations in oil and gas pipelines. Different pipeline parameters can be inspected during the pig journey. Although pigs use many sensors to detect the required pipeline parameters, matching these data with the corresponding pipeline location is considered a very important parameter. High-end, tactical-grade inertial measurement units (IMUs) are used in pigging applications to locate the detected problems of pipeline using other sensors, and to reconstruct the trajectories of the pig. These IMUs are accurate; however, their high cost and large sizes limit their use in small diameter pipelines (8″ or less). This paper describes a new methodology for the use of MEMS-based IMUs using an extended Kalman filter (EKF) and the pipeline junctions to increase the position parameters' accuracy and to reduce the total RMS errors even during the unavailability of above ground markers (AGMs). The results of this new proposed method using a micro-electro-mechanical systems (MEMS)-based IMU revealed that the position RMS errors were reduced by approximately 85% compared to the standard EKF solution. Therefore, this approach will enable the mapping of small diameter pipelines, which was not possible before.

  5. Pipeline engineering. 8. rev. and enl. ed.

    International Nuclear Information System (INIS)

    Wagner, W.

    2000-01-01

    Apart from calculating the strength of pipeline components planning and design are the most important tasks on the areas of apparatus manufacturing, fluid engineering, process engineering and thermal engineering. It is therefore necessary that the flow diagrams of a plant are clearly understandable and in accordance with the technical rules even in the early stages of planning. This book concentrates on steel pipeline which are not laid underground but of the type used mostly in industrial applications. The pictures and equations provided can be used for the design of pipelines, tables and diagrams are given to facilitate estimation of elasticity, pipeline pressure losses and insulating thicknesses. An overview of the equations is given at the end of the book. Many examples facilitate learning. (orig.) [de

  6. Optimizing pipeline transportation using a fuzzy controller

    Energy Technology Data Exchange (ETDEWEB)

    Aramaki, Thiago L.; Correa, Joao L. L.; Montalvoa, Antonio F. F. [National Control and Operation Center Tranpetro, Rio de Janeiro, (Brazil)

    2010-07-01

    The optimization of pipeline transportation is a big concern for the transporter companies. This paper is the third of a series of three articles which investigated the application of a system to simulate the human ability to operate a pipeline in an optimized way. The present paper presents the development of a proportional integral (PI) fuzzy controller, in order to optimize pipeline transportation capacity. The fuzzy adaptive PI controller system was developed and tested with a hydraulic simulator. On-field data were used from the OSBRA pipeline. The preliminary tests showed that the performance of the software simulation was satisfactory. It varied the set-point of the conventional controller within the limits of flow meters. The transport capacity of the pipe was maximize without compromising the integrity of the commodities transported. The system developed proved that it can be easily deployed as a specialist optimizing system to be added to SCADA systems.

  7. Australia's changing natural gas and pipeline industry

    International Nuclear Information System (INIS)

    Kimber, M.J.

    1998-01-01

    The future is bright for continued development of Australia's natural gas pipeline infrastructure, as well as for privatization and private energy infrastructure growth. Gas demands are growing and the development of open access principles for all natural gas transmission and distribution pipelines heralds a much more market focused industry. Within the next few years gas-on-gas competition will apply to supply, pipelines, and retail marketing. No longer will operators be able to pass on high costs resulting from inefficiencies to their customers. This article describes the changing Australian gas industry, evaluates the drivers for change and looks at ways the industry is responding to new regulatory regimes and the development and use of new pipeline technology

  8. Citizenship program in near communities of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mascarenhas, Carina R.; Vilas Boas, Ianne P. [TELSAN Engenharia, Belo Horizonte, MG (Brazil); Bourscheid, Pitagoras [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    During the construction of a pipeline, the IENE - Engineering Unit of PETROBRAS, responsible for the construction and erection of pipelines and related plants in northeastern Brazil, crossed more than 7 states and 250 counties, had implemented a social responsibility program, in special a citizenship program. This action was the result of community studies located near of the pipelines AID - Direct Influence Area (438 yards right and left of the pipeline) and through the evidence that those locations were poor and have no personal documents and citizen position in society. This paper intents to share the experience of IENE about its citizen program that worked in three big lines: community mobilization; citizenship qualification; and citizenship board. This last one, turns possible to people obtains theirs personal documents and exercise the plenitude of citizenship. (author)

  9. Transient leak detection in crude oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Beushausen, R.; Tornow, S.; Borchers, H. [Nord-West Oelleitung, Wilhelmshaven (Germany); Murphy, K.; Zhang, J. [Atmos International Ltd., Manchester (United Kingdom)

    2004-07-01

    Nord-West Oelleitung (NWO) operates 2 crude oil pipelines from Wilhemshaven to Koln and Hamburg respectively. German regulations for transporting flammable substances stipulate that 2 independent continuously working procedures be used to detect leaks. Leak detection pigs are used routinely to complement the surveillance system. This paper described the specific issues of transient leak detection in crude oil pipelines. It was noted that traditional methods have failed to detect leaks that occur immediately after pumps are turned on or off because the pressure wave generated by the transient dominates the pressure wave that results from the leak. Frequent operational changes in a pipeline are often accompanied by an increased number of false alarms and failure to detect leaks due to unsteady operations. NWO therefore decided to have the Atmos statistical pipeline leak detection (SPLD) system installed on their pipelines. The key to the SPLD system is the sequential probability ratio test. Comprehensive data validation is performed following reception of pipeline data from the supervisory control and data acquisition (SCADA) system. The validated data is then used to calculate the corrected flow imbalance, which is fed into the SPRT to determine if there is an increase in the flow imbalance. Pattern recognition is then used to distinguish a leak from operational changes. The SPLD is unique because it uses 3 computational pipeline monitoring methods simultaneously, namely modified volume balance, statistical analysis, and pressure and flow monitoring. The successful installation and testing of the SPLD in 2 crude oil pipelines was described along with the main difficulties associated with transient leaks. Field results were presented for both steady-state and transient conditions. 5 refs., 2 tabs., 16 figs.

  10. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Science.gov (United States)

    2013-08-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0185] Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline and Hazardous Materials Safety...

  11. 78 FR 42889 - Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems

    Science.gov (United States)

    2013-07-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION...

  12. Black powder in gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sherik, Abdelmounam [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Despite its common occurrence in the gas industry, black powder is a problem that is not well understood across the industry, in terms of its chemical and physical properties, source, formation, prevention or management of its impacts. In order to prevent or effectively manage the impacts of black powder, it is essential to have knowledge of its chemical and physical properties, formation mechanisms and sources. The present paper is divided into three parts. The first part of this paper is a synopsis of published literature. The second part reviews the recent laboratory and field work conducted at Saudi Aramco Research and Development Center to determine the compositions, properties, sources and formation mechanisms of black powder in gas transmission systems. Microhardness, nano-indentation, X-ray Diffraction (XRD), X-ray Fluorescence (XRF) and Scanning Electron Microscopy (SEM) techniques were used to analyze a large number of black powder samples collected from the field. Our findings showed that black powder is generated inside pipelines due to internal corrosion and that the composition of black powder is dependent on the composition of transported gas. The final part presents a summary and brief discussion of various black powder management methods. (author)

  13. Simplified Technique for Predicting Offshore Pipeline Expansion

    Science.gov (United States)

    Seo, J. H.; Kim, D. K.; Choi, H. S.; Yu, S. Y.; Park, K. S.

    2018-06-01

    In this study, we propose a method for estimating the amount of expansion that occurs in subsea pipelines, which could be applied in the design of robust structures that transport oil and gas from offshore wells. We begin with a literature review and general discussion of existing estimation methods and terminologies with respect to subsea pipelines. Due to the effects of high pressure and high temperature, the production of fluid from offshore wells is typically caused by physical deformation of subsea structures, e.g., expansion and contraction during the transportation process. In severe cases, vertical and lateral buckling occurs, which causes a significant negative impact on structural safety, and which is related to on-bottom stability, free-span, structural collapse, and many other factors. In addition, these factors may affect the production rate with respect to flow assurance, wax, and hydration, to name a few. In this study, we developed a simple and efficient method for generating a reliable pipe expansion design in the early stage, which can lead to savings in both cost and computation time. As such, in this paper, we propose an applicable diagram, which we call the standard dimensionless ratio (SDR) versus virtual anchor length (L A ) diagram, that utilizes an efficient procedure for estimating subsea pipeline expansion based on applied reliable scenarios. With this user guideline, offshore pipeline structural designers can reliably determine the amount of subsea pipeline expansion and the obtained results will also be useful for the installation, design, and maintenance of the subsea pipeline.

  14. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  15. Market Brief : Turkey oil and gas pipelines

    International Nuclear Information System (INIS)

    2001-08-01

    This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and supervisory control and data acquisition (SCADA) systems. Currently, the major players are suppliers from Italy, Germany, France, United States and Japan. Turkey has no trade barriers and imported equipment and materials are not subjected to any restriction. The oil and gas market in Turkey expected in increase by an average annual growth rate of 15 per cent from 2001 to 2003. A brief description of pipeline projects in Turkey was presented in this report along with a list of key contacts and support services. 25 refs., 1 append

  16. World pipeline work set for rapid growth

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion

  17. Seismic vulnerability of natural gas pipelines

    International Nuclear Information System (INIS)

    Lanzano, Giovanni; Salzano, Ernesto; Santucci de Magistris, Filippo; Fabbrocino, Giovanni

    2013-01-01

    This work deals with the analysis of the interaction of earthquakes with pipelines transporting and distributing natural gas for industrial and civil use. To this aim, a new large data-set of seismic information classified on the basis of selected seismological, geotechnical and structural parameters is presented and analyzed. Particular attention is devoted to continuous pipelines under strong ground shaking, which is the geotechnical effect due to passage of waves in soil. Results are provided in terms of the likelihood of the loss of containment with respect to Peak Ground Velocity (PGV), a seismic intensity parameter which may be easily retrieved either from local authorities and public databases or from site dependent hazard analysis. Fragility functions and seismic intensity threshold values for the failure and for the loss of containment of gas from pipeline systems are also given. The obtained functions can be easily implemented in existing codes and guidelines for industrial risk assessment, land-use planning, and for the design of public distribution network, with specific reference to Natural—Technological interaction (Na-Tech). -- Highlights: • The seismic vulnerability of natural gas pipelines is analyzed. • A collection of data for pipelines damaged by earthquake is given. • Damage states and risk states for pipelines are defined. • Consequence-based fragility formulations for the loss of containment are given • Seismic threshold values for public authority, risk assessment and gas distribution are shown

  18. Rupture detection device for pipeline in reactor

    International Nuclear Information System (INIS)

    Murakoshi, Toshinori; Kanamori, Shigeru; Shirasawa, Hirofumi.

    1991-01-01

    A difference between each of the pressures in a plurality of pipelines disposed in a shroud a reactor container and a pressure outside of the shroud is detected, thereby enabling safety and reliable detection even for simultaneous rapture and leakage of the pipelines. That is, a difference between the pressure of a steam phase outside of the shroud and a pressure in each of a plurality of low pressure injection pipelines in an emergency core cooling system opened to the inside of the shroud in the reactor container is detected by a difference pressure detector for each of them. Then, an average value for each of the pressure difference is determined, which is compared with the difference pressure obtained from each of the detectors in a comparator. Then, if openings should be caused by rupture, leakage or the like in any of the pipelines, the pressure in that pipeline is lowered to a vicinity of an atmospheric pressure and at the vapor phase pressure at the lowest. If the pressure is compared with the average value by the comparator, a negative difference is caused. Accordingly, an alarming unit generates an alarm based on the pressure difference signal, thereby enabling to specify the failed pipeline and provide an announce of the failure. (I.S.)

  19. GRAVITY PIPELINE TRANSPORT FOR HARDENING FILLING MIXTURES

    Directory of Open Access Journals (Sweden)

    Leonid KROUPNIK

    2015-12-01

    Full Text Available In underground mining of solid minerals becoming increasingly common development system with stowing hardening mixtures. In this case the natural ore array after it is replaced by an artificial excavation of solidified filling mixture consisting of binder, aggregates and water. Such a mixture is prepared on the surface on special stowing complexes and transported underground at special stowing pipelines. However, it is transported to the horizons of a few kilometers, which requires a sustainable mode of motion of such a mixture in the pipeline. Hardening stowing mixture changes its rheological characteristics over time, which complicates the calculation of the parameters of pipeline transportation. The article suggests a method of determining the initial parameters of such mixtures: the status coefficient, indicator of transportability, coefficient of hydrodynamic resistance to motion of the mixture. These indicators characterize the mixture in terms of the possibility to transport it through pipes. On the basis of these indicators is proposed methodology for calculating the parameters of pipeline transport hardening filling mixtures in drift mode when traffic on the horizontal part of the mixture under pressure column of the mixture in the vertical part of the backfill of the pipeline. This technique allows stable operation is guaranteed to provide pipeline transportation.

  20. Colisão com o 'efeito estilingue'

    OpenAIRE

    Silveira,Fernando Lang da; Braun,Luci F.M; Braun,Thomas

    2010-01-01

    Abordamos teoricamente a colisão com o 'efeito estilingue' onde um corpo transfere momento linear e energia cinética para um segundo corpo de massa menor, fazendo com que a energia mecânica desse segundo corpo cresça de forma surpreendente. Mostramos que, mesmo quando as colisões são inelásticas, o ganho de energia mecânica pode ser grande. Apresentamos um estudo experimental do interessante efeito realizado a partir de um vídeo. Finalmente discutimos o 'efeito estilingue gravitacional' utili...

  1. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  2. 75 FR 4134 - Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-01-26

    ... safety study on pipeline Supervisory Control and Data Acquisition (SCADA) systems (NTSB/SS-05/02). The... indications of a leak on the SCADA interface was the impetus for this study. The NTSB examined 13 hazardous... pipelines, the line balance technique for leak detection can often be performed with manual calculations...

  3. 77 FR 32631 - Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-13-000] Lion Oil... of the Commission's Rules of Practice and Procedure, 18 CFR 385.202 (2011), Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline Company, collectively, Lion Companies...

  4. The Dangers of Pipeline Thinking: How the School-to-Prison Pipeline Metaphor Squeezes out Complexity

    Science.gov (United States)

    McGrew, Ken

    2016-01-01

    In this essay Ken McGrew critically examines the "school-to-prison pipeline" metaphor and associated literature. The origins and influence of the metaphor are compared with the origins and influence of the competing "prison industrial complex" concept. Specific weaknesses in the "pipeline literature" are examined.…

  5. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  6. A novel approach to pipeline tensioner modeling

    Energy Technology Data Exchange (ETDEWEB)

    O' Grady, Robert; Ilie, Daniel; Lane, Michael [MCS Software Division, Galway (Ireland)

    2009-07-01

    As subsea pipeline developments continue to move into deep and ultra-deep water locations, there is an increasing need for the accurate prediction of expected pipeline fatigue life. A significant factor that must be considered as part of this process is the fatigue damage sustained by the pipeline during installation. The magnitude of this installation-related damage is governed by a number of different agents, one of which is the dynamic behavior of the tensioner systems during pipe-laying operations. There are a variety of traditional finite element methods for representing dynamic tensioner behavior. These existing methods, while basic in nature, have been proven to provide adequate forecasts in terms of the dynamic variation in typical installation parameters such as top tension and sagbend/overbend strain. However due to the simplicity of these current approaches, some of them tend to over-estimate the frequency of tensioner pay out/in under dynamic loading. This excessive level of pay out/in motion results in the prediction of additional stress cycles at certain roller beds, which in turn leads to the prediction of unrealistic fatigue damage to the pipeline. This unwarranted fatigue damage then equates to an over-conservative value for the accumulated damage experienced by a pipeline weld during installation, and so leads to a reduction in the estimated fatigue life for the pipeline. This paper describes a novel approach to tensioner modeling which allows for greater control over the velocity of dynamic tensioner pay out/in and so provides a more accurate estimation of fatigue damage experienced by the pipeline during installation. The paper reports on a case study, as outlined in the proceeding section, in which a comparison is made between results from this new tensioner model and from a more conventional approach. The comparison considers typical installation parameters as well as an in-depth look at the predicted fatigue damage for the two methods

  7. Pipeline capacity and heavy oil markets

    International Nuclear Information System (INIS)

    Scott, G.R.

    1993-01-01

    Aspects of transporting heavy crude to markets from Canadian sources are discussed, with reference to pipeline expansion, western Canadian crude supply, and exports to various Petroleum Administration for Defense Districts (PADDs) in the USA. Pipeline expansions have been proposed by Interprovincial Pipeline, Trans Mountain Pipeline, Rangeland, and Wascana, and some of these proposals are in the review stage. Western Canadian crude supply is expected to peak at 1.9 million bbl/d in 1996. An increase in heavy crude supply is expected but this increase will not be sufficient to offset a decline in light crude supply. Adequate pipeline capacity should exist with the Interprovincial expansion volume of 170,000 bbl/d and the Trans Mountain expansion of 38,000 bbl/d forecast to be in place by 1995. Canadian crude exports to the USA have steadily increased since 1989, and heavy crude exports have grown an average of 20,000 bbl/d each year. In PADD Region IV, oil production is declining and ca 20,000 bbl/d of heavy crude will be needed by the year 2000; additional pipeline capacity will be required. In PADD Region II, Canadian heavy crude imports are ca 390,000 bbl/d and further market opportunities exist, after the Interprovincial expansion is complete. When the various combinations of possible pipeline expansions or reversals are considered, a range of heavy crude near-term growth potentials is obtained in which Canadian heavy oil would displace offshore heavy oil supplied to USA refineries. This potential is seen to range from 35,000 bbl/d to 200,000 bbl/d. 7 refs., 20 figs., 3 tabs

  8. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  9. JGI Plant Genomics Gene Annotation Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Shu, Shengqiang; Rokhsar, Dan; Goodstein, David; Hayes, David; Mitros, Therese

    2014-07-14

    Plant genomes vary in size and are highly complex with a high amount of repeats, genome duplication and tandem duplication. Gene encodes a wealth of information useful in studying organism and it is critical to have high quality and stable gene annotation. Thanks to advancement of sequencing technology, many plant species genomes have been sequenced and transcriptomes are also sequenced. To use these vastly large amounts of sequence data to make gene annotation or re-annotation in a timely fashion, an automatic pipeline is needed. JGI plant genomics gene annotation pipeline, called integrated gene call (IGC), is our effort toward this aim with aid of a RNA-seq transcriptome assembly pipeline. It utilizes several gene predictors based on homolog peptides and transcript ORFs. See Methods for detail. Here we present genome annotation of JGI flagship green plants produced by this pipeline plus Arabidopsis and rice except for chlamy which is done by a third party. The genome annotations of these species and others are used in our gene family build pipeline and accessible via JGI Phytozome portal whose URL and front page snapshot are shown below.

  10. Monitoring device for the reactor pipelines

    International Nuclear Information System (INIS)

    Fukumoto, Akira.

    1983-01-01

    Purpose: To enable rapid and accurate operator's monitoring for the state of pipelines in a BWR type reactor. Constitution: Specific symbols are attached respectively to a fluid supply source constituting the pipelines of a nuclear reactor facility, a plurality of fluid passing points and equipments to be supplied with the fluid, and a symmetrical matrix comprising these symbols in rows and columns is constituted. Then, a matrix is prepared based on detection signals for the states of the liquid supply source, equipments to be supplied with fluid and pipeline equipments by rendering the matrix elements between the signals expressing the state capable of passing the fluid as 1 and the matrix elements between the signals expressing the state incapable of passing the fluid as 0 . The matrix thus prepared in a signal procession circuit and a matrix in a memory circuit previously storing the matrix expressing the normal state of the pipelines are compared to judge the state of the pipelines in a short time and with no misjudging. (Moriyama, K.)

  11. Color correction pipeline optimization for digital cameras

    Science.gov (United States)

    Bianco, Simone; Bruna, Arcangelo R.; Naccari, Filippo; Schettini, Raimondo

    2013-04-01

    The processing pipeline of a digital camera converts the RAW image acquired by the sensor to a representation of the original scene that should be as faithful as possible. There are mainly two modules responsible for the color-rendering accuracy of a digital camera: the former is the illuminant estimation and correction module, and the latter is the color matrix transformation aimed to adapt the color response of the sensor to a standard color space. These two modules together form what may be called the color correction pipeline. We design and test new color correction pipelines that exploit different illuminant estimation and correction algorithms that are tuned and automatically selected on the basis of the image content. Since the illuminant estimation is an ill-posed problem, illuminant correction is not error-free. An adaptive color matrix transformation module is optimized, taking into account the behavior of the first module in order to alleviate the amplification of color errors. The proposed pipelines are tested on a publicly available dataset of RAW images. Experimental results show that exploiting the cross-talks between the modules of the pipeline can lead to a higher color-rendition accuracy.

  12. Diagnostics and reliability of pipeline systems

    CERN Document Server

    Timashev, Sviatoslav

    2016-01-01

    The book contains solutions to fundamental problems which arise due to the logic of development of specific branches of science, which are related to pipeline safety, but mainly are subordinate to the needs of pipeline transportation.          The book deploys important but not yet solved aspects of reliability and safety assurance of pipeline systems, which are vital aspects not only for the oil and gas industry and, in general, fuel and energy industries , but also to virtually all contemporary industries and technologies. The volume will be useful to specialists and experts in the field of diagnostics/ inspection, monitoring, reliability and safety of critical infrastructures. First and foremost, it will be useful to the decision making persons —operators of different types of pipelines, pipeline diagnostics/inspection vendors, and designers of in-line –inspection (ILI) tools, industrial and ecological safety specialists, as well as to researchers and graduate students.

  13. Hazard identification studies applied to oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Savio, Augusto; Alpert, Melina L. [TECNA S.A., Buenos Aires (Argentina)], e-mail: asavio@tecna.com, e-mail: malpert@tecna.com

    2008-07-01

    In order to assess risks inherent to an Oil Pipeline, it is imperative to analyze what happens 'outside the process'. HAZID (HAZard IDentification) studies are mainly carried out for this purpose. HAZID is a formal study which identifies hazards and risks associated to an operation or facility and enable its acceptability assessment. It is a brainstorming exercise guided by a typical 'Checklist', divided into four Sections: External, Facilities and Health Hazards and Issues pertaining to Project Execution, which are further subdivided into Hazard Categories. For each Category, there are 'Guide-words' and 'Prompts'. Even if an Oil Pipeline Risk Assessment can be performed by means of the above referred 'Checklist', carrying out the actual process can become lengthy and annoying due to the lack of specificity. This work aims at presenting the most suitable 'Checklist' for the identification of Oil Pipeline Risk Assessment, although it could be used for Gas Pipeline Risk Assessment too. Prepared ad hoc, this list, is based on the spill causes established by CONCAWE (CONservation of Clean Air Water in Europe). Performing Oil Pipeline Risk Assessment by means of specially formulated Checklist enables the Study Team to easily identify risks, shortens execution time and provides both accuracy and specificity. (author)

  14. Validation of pig operations through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Tolmasquim, Sueli Tiomno [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Nieckele, Angela O. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica

    2005-07-01

    In the oil industry, pigging operations in pipelines have been largely applied for different purposes: pipe cleaning, inspection, liquid removal and product separation, among others. An efficient and safe pigging operation requires that a number of operational parameters, such as maximum and minimum pressures in the pipeline and pig velocity, to be well evaluated during the planning stage and maintained within stipulated limits while the operation is accomplished. With the objective of providing an efficient tool to assist in the control and design of pig operations through pipelines, a numerical code was developed, based on a finite difference scheme, which allows the simulation of two fluid transient flow, like liquid-liquid, gas-gas or liquid-gas products in the pipeline. Modules to automatically control process variables were included to employ different strategies to reach an efficient operation. Different test cases were investigated, to corroborate the robustness of the methodology. To validate the methodology, the results obtained with the code were compared with a real liquid displacement operation of a section of the OSPAR oil pipeline, belonging to PETROBRAS, with 30'' diameter and 60 km length, presenting good agreement. (author)

  15. Pipesworld : applying planning systems to pipeline transportation

    Energy Technology Data Exchange (ETDEWEB)

    Milidiu, R.L.; Santos Liporace, F. [Pontificia Univ. Catolica, Rio de Janeiro (Brazil). Dept. de Informatica

    2004-07-01

    This paper explored issues facing the complex task of managing pipelines that transport large volumes of petroleum products over long distances. Since oil pipelines are generally a few inches wide and several miles long, reasonable amounts of distinct products can be transported with very small loss due to the mixing at liquid boundaries. Optimizing the transportation through oil pipelines in terms of maintenance and environmental safety is a high priority for pipeline operators. This paper presented the Pipesworld model which takes into account features such as product interface constraints, limited product storage capacities and due dates for product delivery. It has been benchmarked as a start-of-art general purpose artificial planning system. This paper also reported the results derived by general purpose artificial intelligence planning systems when applied to the Pipesworld model. It demonstrated how various modelling techniques can be used to enhance the planners performance. Current work in developing Plumber was also presented. This dedicated solver that addresses operational situations uses both general purpose planning techniques as well as domain specific knowledge. When Plumber was incorporated into Pipesworld, its outperformed Fast-Forward, one of the best available general purpose planning systems, suggesting that improved versions of Plumber have the potential to deal with various problem scenarios in pipeline operations. 11 refs., 2 tabs., 3 figs.

  16. Bauxite slurry pipeline: start up operation

    Energy Technology Data Exchange (ETDEWEB)

    Othon, Otilio; Babosa, Eder; Edvan, Francisco; Brittes, Geraldo; Melo, Gerson; Janir, Joao; Favacho, Orlando; Leao, Marcos; Farias, Obadias [Vale, Rio de Janeiro, RJ (Brazil); Goncalves, Nilton [Anglo Ferrous Brazil S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The mine of Miltonia is located in Paragominas-PA, in the north of Brazil. Bauxite slurry pipeline starts at the Mine of Miltonia and finishes in the draining installation of Alunorte refinery at the port of Barcarena-PA, located approximately 244km away from the mine. The pipeline runs over seven cities and passes below four great rivers stream beds. The system was designed for an underground 24 inches OD steel pipe to carry 9.9 million dry metric tonnes per annum (dMTAs) of 50.5% solid concentration bauxite slurry, using only one pumping station. The system is composed by four storage tanks and six piston diaphragm pumps, supplying a flow of 1680 m3/h. There is a cathodic protection system along the pipeline extension to prevent external corrosion and five pressure monitoring stations to control hydraulic conditions, there is also a fiber optic cable interconnection between pump station and terminal station. Pipeline Systems Incorporated (PSI) was the designer and followed the commissioning program of the start up operations. This paper will describe the beginning of the pipeline operations, technical aspects of the project, the operational experiences acquired in these two years, the faced problems and also the future planning. (author)

  17. Corrosion induced failure analysis of subsea pipelines

    International Nuclear Information System (INIS)

    Yang, Yongsheng; Khan, Faisal; Thodi, Premkumar; Abbassi, Rouzbeh

    2017-01-01

    Pipeline corrosion is one of the main causes of subsea pipeline failure. It is necessary to monitor and analyze pipeline condition to effectively predict likely failure. This paper presents an approach to analyze the observed abnormal events to assess the condition of subsea pipelines. First, it focuses on establishing a systematic corrosion failure model by Bow-Tie (BT) analysis, and subsequently the BT model is mapped into a Bayesian Network (BN) model. The BN model facilitates the modelling of interdependency of identified corrosion causes, as well as the updating of failure probabilities depending on the arrival of new information. Furthermore, an Object-Oriented Bayesian Network (OOBN) has been developed to better structure the network and to provide an efficient updating algorithm. Based on this OOBN model, probability updating and probability adaptation are performed at regular intervals to estimate the failure probabilities due to corrosion and potential consequences. This results in an interval-based condition assessment of subsea pipeline subjected to corrosion. The estimated failure probabilities would help prioritize action to prevent and control failures. Practical application of the developed model is demonstrated using a case study. - Highlights: • A Bow-Tie (BT) based corrosion failure model linking causation with the potential losses. • A novel Object-Oriented Bayesian Network (OOBN) based corrosion failure risk model. • Probability of failure updating and adaptation with respect to time using OOBN model. • Application of the proposed model to develop and test strategies to minimize failure risk.

  18. Stress analysis and mitigation measures for floating pipeline

    Science.gov (United States)

    Wenpeng, Guo; Yuqing, Liu; Chao, Li

    2017-03-01

    Pipeline-floating is a kind of accident with contingency and uncertainty associated to natural gas pipeline occurring during rainy season, which is significantly harmful to the safety of pipeline. Treatment measures against pipeline floating accident are summarized in this paper on the basis of practical project cases. Stress states of pipeline upon floating are analyzed by means of Finite Element Calculation method. The effectiveness of prevention ways and subsequent mitigation measures upon pipeline-floating are verified for giving guidance to the mitigation of such accidents.

  19. 25 CFR 169.5 - Application for right-of-way.

    Science.gov (United States)

    2010-04-01

    ... satisfactory evidence of the good faith and financial responsibility of the applicant. An application filed by... to do business in the State where the land is located. An application filed by an unincorporated..., uprooted, or otherwise accumulated during the construction and maintenance of the project. (f) To take soil...

  20. Decision framework for corridor planning within the roadside right-of-way.

    Science.gov (United States)

    2013-08-01

    A decision framework was developed for context-sensitive planning within the roadside ROW in : Michigan. This framework provides a roadside suitability assessment model that may be used to : support integrated decision-making and policy level conside...

  1. Harnessing Pavement Power : Developing Renewable Energy Technology in the Public Right-of-Way

    Science.gov (United States)

    2013-09-18

    Intelligent Compaction (IC) of soil and asphalt mixes is an innovative approach that has been utilized to achieve uniform, adequate compaction of pavement layers during construction. Commercially available IC products provide machine specific compact...

  2. Stormwater Controls for Pollutant Removal on GDOT Right-Of-Way

    Science.gov (United States)

    2012-04-11

    The Georgia Department of Transportation (GDOT) operates a large number of roadside stormwater treatment facilities to contain and treat roadside stormwater runoff. The stormwater best management practices (BMPs) were designed with an emphasis on the...

  3. 76 FR 44663 - Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way

    Science.gov (United States)

    2011-07-26

    ... advisory sections in shaded boxes, and indents subsections under the main sections. Introduction The Access... Standards without the elevator exception or UFAS) or the DOJ 2010 Standards between September 15, 2010 and...

  4. Alternative Uses of Highway Right-of-Way : Accommodating Renewable Energy Technologies and Alternative Fuel Facilities

    Science.gov (United States)

    2012-01-31

    In recent years, the U.S. Department of Transportation (U.S. DOT) has sought to better understand global climate change and the transportation sectors effects on the issue, and vice versa. The Safe, Accountable, Flexible, Efficient Transportation ...

  5. 14 CFR 91.113 - Right-of-way rules: Except water operations.

    Science.gov (United States)

    2010-01-01

    ... not take advantage of this rule to cut in front of another which is on final approach to land or to... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Flight... pass well clear. (g) Landing. Aircraft, while on final approach to land or while landing, have the...

  6. Alternative uses of highway rights-of-way : accommodating renewable energy technologies

    Science.gov (United States)

    2012-01-01

    In recent years, the capacity, generation, and consumption of energy derived from renewable sources have grown significantly on a global level. To increase renewable energy production in the near term, state and local transportation agencies have rec...

  7. Feasibility and applications of RFID technologies to support Right-of-Way functions : technical report

    Science.gov (United States)

    2010-08-01

    Radio frequency identification device (RFID) technology provides the capability to store a unique identification : number and some basic attribute information, which can be retrieved wirelessly. This research project studied : the feasibility of usin...

  8. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  9. Safety installation for preventing pollution by pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Wittgenstein, G F

    1972-10-25

    A safety installation for preventing pollution by pipelines, particularly those used for transporting liquid hydrocarbons, is described. It is applicable to any pipeline, but particularly to underground or submarine pipelines, whether made of steel, plastics, or any other material. The 4 essential objects of the invention are to insure reliable prevention of pollution of the environment due to leakage of a hydrocarbon through cracks in the pipe; to evacuate the leakage flow without delay to a vessel; to signal almost instantaneously the existence of a leak; and to effect remote control of operations by which the dynamic pressure in the pipe is cancelled. Each equipped section consists of a fluid-type jacket of plastic material which surrounds the pipe, which at its ends is sealed off. It is these seals which delimit the sections. (7 claims)

  10. V-GAP: Viral genome assembly pipeline

    KAUST Repository

    Nakamura, Yoji

    2015-10-22

    Next-generation sequencing technologies have allowed the rapid determination of the complete genomes of many organisms. Although shotgun sequences from large genome organisms are still difficult to reconstruct perfect contigs each of which represents a full chromosome, those from small genomes have been assembled successfully into a very small number of contigs. In this study, we show that shotgun reads from phage genomes can be reconstructed into a single contig by controlling the number of read sequences used in de novo assembly. We have developed a pipeline to assemble small viral genomes with good reliability using a resampling method from shotgun data. This pipeline, named V-GAP (Viral Genome Assembly Pipeline), will contribute to the rapid genome typing of viruses, which are highly divergent, and thus will meet the increasing need for viral genome comparisons in metagenomic studies.

  11. Digitally assisted pipeline ADCs theory and implementation

    CERN Document Server

    Murmann, Boris

    2007-01-01

    List of Figures. List of Tables. Acknowledgements. Preface. 1: Introduction. 1. Motivation. 2. Overview. 3. Chapter Organization. 2: Performance Trends. 1. Introduction. 2. Digital Performance Trends. 3. ADC Performance Trends. 3: Scaling Analysis. 1. Introduction. 2. Basic Device Scaling from a Digital Perspective. 3. Technology Metrics for Analog Circuits. 4. Scaling Impact on Matching-Limited Circuits. 5. Scaling Impact on Noise-Limited Circuits. 4: Improving Analog Circuit Efficiency. 1. Introduction. 2. Analog Circuit Challenges. 3. The Cost of Feedback. 4. Two-Stage Feedback Amplifier vs. Open-Loop Gain Stage. 5. Discussion. 5: Open-Loop Pipelined ADCs. 1. A Brief Review of Pipelined ADCs. 2. Conventional Stage Implementation. 3. Open-Loop Pipeline Stages. 4. Alternative Transconductor Implementations. 6: Digital Nonlinearity Correction. 1. Overview. 2. Error Model and Digital Correction. 3. Alternative Error Models. 7: Statistics-Based Parameter Estimation. 1. Introduction. 2. Modulation Approach. 3. R...

  12. Design Against Propagating Shear Failure in Pipelines

    Science.gov (United States)

    Leis, B. N.; Gray, J. Malcolm

    Propagating shear failure can occur in gas and certain hazardous liquid transmission pipelines, potentially leading to a large long-burning fire and/or widespread pollution, depending on the transported product. Such consequences require that the design of the pipeline and specification of the steel effectively preclude the chance of propagating shear failure. Because the phenomenology of such failures is complex, design against such occurrences historically has relied on full-scale demonstration experiments coupled with empirically calibrated analytical models. However, as economic drivers have pushed toward larger diameter higher pressure pipelines made of tough higher-strength grades, the design basis to ensure arrest has been severely compromised. Accordingly, for applications where the design basis becomes less certain, as has occurred increasing as steel grade and toughness has increased, it has become necessary to place greater reliance on the use and role of full-scale testing.

  13. The LCOGT Science Archive and Data Pipeline

    Science.gov (United States)

    Lister, Tim; Walker, Z.; Ciardi, D.; Gelino, C. R.; Good, J.; Laity, A.; Swain, M.

    2013-01-01

    Las Cumbres Observatory Global Telescope (LCOGT) is building and deploying a world-wide network of optical telescopes dedicated to time-domain astronomy. In the past year, we have deployed and commissioned four new 1m telescopes at McDonald Observatory, Texas and at CTIO, Chile, with more to come at SAAO, South Africa and Siding Spring Observatory, Australia. To handle these new data sources coming from the growing LCOGT network, and to serve them to end users, we have constructed a new data pipeline and Science Archive. We describe the new LCOGT pipeline, currently under development and testing, which makes use of the ORAC-DR automated recipe-based data reduction pipeline and illustrate some of the new data products. We also present the new Science Archive, which is being developed in partnership with the Infrared Processing and Analysis Center (IPAC) and show some of the new features the Science Archive provides.

  14. Engineering critical assessment of PETROBRAS Camarupim pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, J.R. [Microalloying International, Houston, TX (United States); Gatlin, R.W. [Global Industries, Rio de Janeiro, RJ (Brazil); Zumpano Junior, P.; Kaspary, T. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    This paper presents details of an Engineering Critical Assessment (ECA) performed to develop girth weld flaw acceptance criteria for the PETROBRAS Camarupim Pipeline which was installed in Espirito Santo Basin, ES, offshore Brazil in May 2008 by Global Industries. The pipeline was constructed using 24-inch diameter API Grade X65 pipe with wall thicknesses of 0.875-inch (22.2 mm) and 1.00 inch (25.4 mm). Although the Camarupim pipeline will initially transport sweet gas there is the potential for mildly sour service operation in mid to late life. To assess the effect of sour service on the material toughness properties a series of slow strain rate fracture toughness tests were performed in a Project representative sour service environment. In addition the results of sour service fatigue crack growth tests were analyzed to develop a conservative sour service fatigue crack growth law for the ECA analysis. (author)

  15. The SWAT approach for pipeline watercourse crossings

    Energy Technology Data Exchange (ETDEWEB)

    Jasper, Steve [WorleyParsons Calgary, Pipeline Systems Business Unit, Calgary, AB (Canada)], email: steve.jasper@worleyparsons.com; Harris, Jason D. [Triton Environmental Consultants Ltd., Terrace, British Columbia (Canada)], email: jharris@triton-env.com; Doering, Raymond [Enbridge Northern Gateway Pipelines, Calgary, AB (Canada)], email: raymond.doering@enbridge.com

    2010-07-01

    In a pipeline project, watercourse crossings are an important environmental and technical challenge. In identifying the best crossing location and method, many factors must be taken into account such as fish habitat, access, geotechnical and hydrological issues. The aim of this paper is to present a program used in a major pipeline project to assess crossings of sensitive watercourses. This program was implemented in the Enbridge Northern Gateway project which extends from Bruderheim, Alberta, to Kitimat, British Columbia, crossing over 750 watercourses. A sensitive watercourse assessment (SWAT) team composed of a fisheries biologist, a pipeline watercourse construction specialist and other personnel carried out assessments on the 200 sensitive watercourses identified. This program led to recommendations to shift the crossing location at 40% of the sensitive sites. This project showed that setting up a SWAT team be helpful in choosing the best location, method and construction timing for a crossing.

  16. The Dark Energy Survey Image Processing Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morganson, E.; et al.

    2018-01-09

    The Dark Energy Survey (DES) is a five-year optical imaging campaign with the goal of understanding the origin of cosmic acceleration. DES performs a 5000 square degree survey of the southern sky in five optical bands (g,r,i,z,Y) to a depth of ~24th magnitude. Contemporaneously, DES performs a deep, time-domain survey in four optical bands (g,r,i,z) over 27 square degrees. DES exposures are processed nightly with an evolving data reduction pipeline and evaluated for image quality to determine if they need to be retaken. Difference imaging and transient source detection are also performed in the time domain component nightly. On a bi-annual basis, DES exposures are reprocessed with a refined pipeline and coadded to maximize imaging depth. Here we describe the DES image processing pipeline in support of DES science, as a reference for users of archival DES data, and as a guide for future astronomical surveys.

  17. V-GAP: Viral genome assembly pipeline

    KAUST Repository

    Nakamura, Yoji; Yasuike, Motoshige; Nishiki, Issei; Iwasaki, Yuki; Fujiwara, Atushi; Kawato, Yasuhiko; Nakai, Toshihiro; Nagai, Satoshi; Kobayashi, Takanori; Gojobori, Takashi; Ototake, Mitsuru

    2015-01-01

    Next-generation sequencing technologies have allowed the rapid determination of the complete genomes of many organisms. Although shotgun sequences from large genome organisms are still difficult to reconstruct perfect contigs each of which represents a full chromosome, those from small genomes have been assembled successfully into a very small number of contigs. In this study, we show that shotgun reads from phage genomes can be reconstructed into a single contig by controlling the number of read sequences used in de novo assembly. We have developed a pipeline to assemble small viral genomes with good reliability using a resampling method from shotgun data. This pipeline, named V-GAP (Viral Genome Assembly Pipeline), will contribute to the rapid genome typing of viruses, which are highly divergent, and thus will meet the increasing need for viral genome comparisons in metagenomic studies.

  18. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  19. Dynamics stresses in pipelines and components

    International Nuclear Information System (INIS)

    Prates, C.L.M.; Stukart, R.N.L.; Halbritter, A.L.

    1982-01-01

    The procedure to generate the dynamic stresses caused by external events, necessary for the structural calculation of pipelines and components in nuclear power plants is presented. A special attention is given to the stress caused by the action of earthquakes and exterior explosions. In the dynamic analysis of pipeline and components is usually to show the stresses procedured by these events under the response spectra form. The methodology to obtain these response spectra is shown and discussed. Some pratical examples of spectra from nuclear power plant building are still shown. (E.G.) [pt

  20. Preventing erosion at pipeline crossings of watercourses

    International Nuclear Information System (INIS)

    Sawatsky, L.; Arnold, G.

    1997-01-01

    Watercourses are naturally vulnerable to erosion but the risk is particularly acute after sub-soil and armour materials have been disturbed by trenching and backfilling during construction. Various types of erosion (river scour, river bed, river channel bed and river bank ) and the progressive removal of pipeline cover resulting from erosion were discussed. Methods of estimating the risk of progressive erosion, river avulsions and beaver dam scour, and methods of mitigating erosion at pipeline crossings such as deep burial, proper siting, conventional armouring, and a combination of bank toe protection, and upper bank vegetation cover, were described

  1. Vulnerability maps for Druzba crude oil pipeline

    International Nuclear Information System (INIS)

    Hladik, P.; Hosnedl, P.; Buresova, H.; Corbet, J.

    2012-01-01

    Maps of risk for individual environmental aspects within the protection zone of the Czech part of the Druzba crude oil pipeline (505.7 km) were developed based on a modified 'H and V index' method. Risk data were added into a GIS of the Druzba pipeline so that the system could be used as conceptual material in the field of environmental protection (a base for the new SCADA system). Considered environmental aspects were assessed in terms of their vulnerability. The criteria were defined as the vulnerability of the aquatic environment (surface waters and ground waters), the vulnerability of soil environment and the vulnerability of biotic components of the environment. (authors)

  2. Analysis of the Komineft Pipeline oil

    Energy Technology Data Exchange (ETDEWEB)

    Lambert, P.; Wang, Z.; Fieldhouse, B.; Jokuty, P.; Bissonnette, M.; Fingas, M. [Whiticar Scientific, Ottawa, ON (Canada); Whiticar, S. [Whiticar Scientific, Ottawa, ON (Canada); Kyle, D.; Landriault, M.; Sigouin, L.; Goldthorp, M.

    1995-12-31

    A detailed summary of the results of a study by Canadian experts acting as members of a United Nations (UN) team at a pipeline oil spill site in Western Siberia was presented. The purpose of the UN visit was to assess existing damage to the environment and to determine potential future hazards. A Komineft Pipeline oil sample was examined and its composition and characteristics were established. The oil characterization included determination of density, viscosity, pour point, interfacial tension, flash point, water content, dispersant effectiveness, sulphur content, evaporative loss, emulsion viscosity, emulsion water content and hydrocarbon group composition. 11 refs., 20 tabs., 17 figs.

  3. Self lubrication of bitumen froth in pipelines

    International Nuclear Information System (INIS)

    Joseph, D.D.

    1997-01-01

    In this paper I will review the main properties of water lubricated pipelines and explain some new features which have emerged from studies of self-lubrication of Syncrudes' bitumen froth. When heavy oils are lubricated with water, the water and oil are continuously injected into a pipeline and the water is stable when in a lubricating sheath around the oil core. In the case of bitumen froth obtained from the Alberta tar sands, the water is dispersed in the bitumen and it is liberated at the wall under shear; water injection is not necessary because the froth is self-lubricating

  4. 77 FR 22387 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  5. 75 FR 5640 - Pipeline Safety: Implementation of Revised Incident/Accident Report Forms for Distribution...

    Science.gov (United States)

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems AGENCY: Pipeline and.... SUMMARY: This notice advises owners and operators of gas pipeline facilities and hazardous liquid pipeline...

  6. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Operator Identification Numbers AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... liquid, and carbon dioxide pipelines and liquefied natural gas facilities that the Pipeline and Hazardous...

  7. 78 FR 65427 - Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied...

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied Petroleum Gas Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration...

  8. 78 FR 38803 - Pipeline Safety: Information Collection Activities, Revisions to Incident and Annual Reports for...

    Science.gov (United States)

    2013-06-27

    ... Reports for Gas Pipeline Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... (OMB) Control No. 2137-0522, titled ``Incident and Annual Reports for Gas Pipeline Operators.'' PHMSA...

  9. 77 FR 58616 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  10. 75 FR 58014 - Pipeline Safety: Information Collection Activity; Request for Comments

    Science.gov (United States)

    2010-09-23

    ..., supports pipeline safety by ensuring the proper functioning of CPM leak detection systems. Affected Public...-phase hazardous liquid pipeline facilities that use computational pipeline monitoring (CPM) leak... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...

  11. 77 FR 20807 - Northwest Pipeline GP; Notice of Application

    Science.gov (United States)

    2012-04-06

    ... diameter pipelines away from an adjacent surface coal mine west of Kemmerer, Wyoming. Northwest also... directed to Pam Barnes, Manager Certificates and Tariffs, Northwest Pipeline GP, 295 Chipeta Way, Salt Lake...

  12. 76 FR 45332 - Pipeline and Hazardous Materials Safety Administration

    Science.gov (United States)

    2011-07-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Office of... Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: List of Applications for Modification of..., 2011. ADDRESSES: Record Center, Pipeline and Hazardous Materials Safety Administration, U.S. Department...

  13. 76 FR 70217 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-11-10

    ... combined comment from American Petroleum Institute (API) and American Oil Pipelines Association (AOPL) on... some rural low-stress hazardous liquid pipelines are not subject to part 195 although they are required...

  14. Software for natural gas pipeline design and simulation (gaspisim ...

    African Journals Online (AJOL)

    Software for natural gas pipeline design and simulation (gaspisim) ... This paper focuses on the development of software for optimum design and simulation of natural gas pipeline. General ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  15. Diagnosing plant pipeline system performance using radiotracer techniques

    Energy Technology Data Exchange (ETDEWEB)

    Kasban, H.; Ali, Elsayed H.; Arafa, H. [Engineering Department, Nuclear Research Center, Atomic Energy Authority, Inshas (Egypt)

    2017-02-15

    This study presents an experimental work in a petrochemical company for scanning a buried pipeline using Tc{sup 99m} radiotracer based on the measured velocity changes, in order to determine the flow reduction along a pipeline. In this work, Tc{sup 99m} radiotracer was injected into the pipeline and monitored by sodium iodide scintillation detectors located at several positions along the pipeline. The flow velocity has been calculated between every two consecutive detectors along the pipeline. Practically, six experiments have been carried out using two different data acquisition systems, each of them being connected to four detectors. During the fifth experiment, a bypass was discovered between the scanned pipeline and another buried parallel pipeline connected after the injection point. The results indicate that the bypass had a bad effect on the volumetric flow rate in the scanned pipeline.

  16. The research of qualitative indicators of gas pipelines during the ...

    African Journals Online (AJOL)

    The research of qualitative indicators of gas pipelines during the operation. ... Journal of Fundamental and Applied Sciences ... The quality control study of the inter-settlement gas pipeline section was conducted, and graphs of dependence of ...

  17. Investigation of Corrosion of Buried Oil Pipeline by the Electrical ...

    African Journals Online (AJOL)

    MICHAEL

    ABSTRACT: The delineation of possible areas of corrosion along an underground oil pipeline in Ubeji, ... prevention of pipeline failure with its attendant environmental, human and economic consequences. @ JASEM .... Cathodic protection as.

  18. Distributed acoustic sensing for pipeline monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Hill, David; McEwen-King, Magnus [OptaSense, QinetiQ Ltd., London (United Kingdom)

    2009-07-01

    Optical fibre is deployed widely across the oil and gas industry. As well as being deployed regularly to provide high bandwidth telecommunications and infrastructure for SCADA it is increasingly being used to sense pressure, temperature and strain along buried pipelines, on subsea pipelines and downhole. In this paper we present results from the latest sensing capability using standard optical fibre to detect acoustic signals along the entire length of a pipeline. In Distributed Acoustic Sensing (DAS) an optical fibre is used for both sensing and telemetry. In this paper we present results from the OptaSense{sup TM} system which has been used to detect third party intervention (TPI) along buried pipelines. In a typical deployment the system is connected to an existing standard single-mode fibre, up to 50km in length, and was used to independently listen to the acoustic / seismic activity at every 10 meter interval. We will show that through the use of advanced array processing of the independent, simultaneously sampled channels it is possible to detect and locate activity within the vicinity of the pipeline and through sophisticated acoustic signal processing to obtain the acoustic signature to classify the type of activity. By combining spare fibre capacity in existing buried fibre optic cables; processing and display techniques commonly found in sonar; and state-of-the-art in fibre-optic distributed acoustic sensing, we will describe the new monitoring capabilities that are available to the pipeline operator. Without the expense of retrofitting sensors to the pipeline, this technology can provide a high performance, rapidly deployable and cost effective method of providing gapless and persistent monitoring of a pipeline. We will show how this approach can be used to detect, classify and locate activity such as; third party interference (including activity indicative of illegal hot tapping); real time tracking of pigs; and leak detection. We will also show how an

  19. The repair of ground cover of Bolivia-Brazil gas pipeline near Paraguay River crossing, in a swamp soft soil region, using geo synthetics reinforced backfilling; Reparo da cobertura do gasoduto Bolivia-Brasil junto ao Rio Paraguai, em trecho com solo mole, utilizando aterro reforcado com geosinteticos

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Cesar Augusto; Jorge, Kemal Vieira; Bechuate Filho, Pedro [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Campo Grande, MS (Brazil). Gerencia Regional Centro Oeste (CRGO); Teixeira, Sidnei H.C. [Geohydrotech Engenharia S.C. Ltda., Braganca Paulista, SP (Brazil)

    2005-07-01

    TBG - Transportadora Gasoduto Bolivia-Brasil S.A, executes routine maintenance works at the Gas Pipeline Right of Way, seeking its integrity. In the wetlands of Pantanal, near the Paraguay river crossing, the organic-alluvial soil was submitted to the process of subsidence. This process, associated with the river water flow erosion, shrank the soil volume and diminished or extinguished the pipeline land cover. The pipeline was exposed to the environment, and submitted to tension stresses and the risk of low cycle fatigue during the floods. The cathodic protection system also had to be evaluated, specially in the drought. To mitigate the problem, the embankment technique was adopted using sandy soil, reinforced with polyester geo-webs and with woven polipropene geo-textiles. The solution also used geo-webs with soil-cement as protection elements against the degradation of the geo-textiles blankets. Some monitoring works are associated with those interventions: monitoring of cathodic protection; topographical verification of horizontal and vertical displacements of the pipeline; levels of land covering, and rainfalls and flood measurement. The base of the embankment was built with hydraulic transported soil, and at the end consistently supported the gas pipeline. (author)

  20. Repair methods for damaged pipeline beyond diving depth

    OpenAIRE

    Mohammadi, Keramat

    2011-01-01

    Master's thesis in Offshore Technology Mechanical damage of a subsea pipeline is found as one of the most severe concern in management of pipeline integrity. The need to reach and bring the hydrocarbons from the fields located in deep and ultra-deep waters, imposes the need to improve the technologies and techniques in order to repair any unacceptable damage in pipeline. The main objective of this work is to investigate various methods for repairing a subsea pipeline that has been damaged ...

  1. FUZZY INFERENCE BASED LEAK ESTIMATION IN WATER PIPELINES SYSTEM

    OpenAIRE

    N. Lavanya; G. Anand; S. Srinivasan

    2015-01-01

    Pipeline networks are the most widely used mode for transporting fluids and gases around the world. Leakage in this pipeline causes harmful effects when the flowing fluid/gas is hazardous. Hence the detection of leak becomes essential to avoid/minimize such undesirable effects. This paper presents the leak detection by spectral analysis methods in a laboratory pipeline system. Transient in the pressure signal in the pipeline is created by opening and closing the exit valve. These pressure var...

  2. ORAC-DR: A generic data reduction pipeline infrastructure

    Science.gov (United States)

    Jenness, Tim; Economou, Frossie

    2015-03-01

    ORAC-DR is a general purpose data reduction pipeline system designed to be instrument and observatory agnostic. The pipeline works with instruments as varied as infrared integral field units, imaging arrays and spectrographs, and sub-millimeter heterodyne arrays and continuum cameras. This paper describes the architecture of the pipeline system and the implementation of the core infrastructure. We finish by discussing the lessons learned since the initial deployment of the pipeline system in the late 1990s.

  3. Multi-Criteria Decision Making Models for Water Pipelines

    OpenAIRE

    El Chanati, Hisham; El-Abbasy, Mohammed S.; Mosleh, Fadi; Senouci, Ahmed; Abouhamad, Mona; Gkountis, Iason; Zayed, Tarek; Al-Derham, Hassan

    2016-01-01

    The deterioration of water pipelines leads to impaired water quality, increased breakage rate, and reduced hydraulic capacity. The planning of maintenance programs for water pipelines is essential to minimize health and safety concerns and ensure an adequate supply of water in a safe, cost-effective, reliable, and sustainable manner. It is essential to assess the performance of water pipelines to assist municipalities in planning inspection and rehabilitation programs for their pipelines. Sev...

  4. PIPELINE CORROSION CONTROL IN OIL AND GAS INDUSTRY: A ...

    African Journals Online (AJOL)

    Corrosion in pipelines is one of the major challenges faced by oil and gas industries all over the world. This has made corrosion control or management a major factor to consider before setting up any industry that will transport products via pipelines. In this study the types of corrosion found on system 2A pipeline were; ...

  5. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Science.gov (United States)

    2010-11-02

    ... regulations to address human factors and other aspects of control room management for certain pipelines where controllers use supervisory control and data acquisition (SCADA) systems. Under the final rule, pipeline... Washington, DC on October 22, 2010. Jeffrey D. Wiese, Associate Administrator for Pipeline Safety. [FR Doc...

  6. 76 FR 45904 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... at U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200...: On Occasion. Title: Record Keeping for Natural Gas Pipeline Operators. OMB Control Number: 2137-0049...

  7. 75 FR 45696 - Pipeline Safety: Personal Electronic Device Related Distractions

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... and operators of natural gas and hazardous liquid pipeline facilities are required to have and follow.... Advisory Bulletin (ADB-10-06) To: Owners and Operators of Hazardous Liquid and Natural Gas Pipeline Systems...

  8. Sensor and transmitter system for communication in pipelines

    Science.gov (United States)

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  9. Examination of faults active motion on buried pipelines | Parish ...

    African Journals Online (AJOL)

    ... lateral spreading, landslides and slope failures. Since the pipelines are widely spread, and in some areas necessarily cross through the areas with faults, therefore, improvement study of pipelines in areas with faults is very important. This article explores faults active motion on buried pipelines. Keywords: water utilities ...

  10. Stress and Strain State Analysis of Defective Pipeline Portion

    Science.gov (United States)

    Burkov, P. V.; Burkova, S. P.; Knaub, S. A.

    2015-09-01

    The paper presents computer simulation results of the pipeline having defects in a welded joint. Autodesk Inventor software is used for simulation of the stress and strain state of the pipeline. Places of the possible failure and stress concentrators are predicted on the defective portion of the pipeline.

  11. Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications

    Science.gov (United States)

    2010-08-01

    Significant financial and environmental consequences often result from line leakage of oil product pipelines. Product can escape into the surrounding soil as even the smallest leak can lead to rupture of the pipeline. From a health perspective, water...

  12. Modeling and monitoring of pipelines and networks advanced tools for automatic monitoring and supervision of pipelines

    CERN Document Server

    Torres, Lizeth

    2017-01-01

    This book focuses on the analysis and design of advanced techniques for on-line automatic computational monitoring of pipelines and pipe networks. It discusses how to improve the systems’ security considering mathematical models of the flow, historical flow rate and pressure data, with the main goal of reducing the number of sensors installed along a pipeline. The techniques presented in the book have been implemented in digital systems to enhance the abilities of the pipeline network’s operators in recognizing anomalies. A real leak scenario in a Mexican water pipeline is used to illustrate the benefits of these techniques in locating the position of a leak. Intended for an interdisciplinary audience, the book addresses researchers and professionals in the areas of mechanical, civil and control engineering. It covers topics on fluid mechanics, instrumentation, automatic control, signal processing, computing, construction and diagnostic technologies.

  13. Annual compensation for pipelines in Alberta

    International Nuclear Information System (INIS)

    2008-11-01

    The Surface Rights Board (SRB) in Alberta held a hearing in November 2007 to address three issues involving a pipeline for Enbridge Pipelines (Athabasca) Inc. as well as several land owner issues in Townships 66-68 and Ranges 17-19, all west of the 4th Meridian. The issues the SRB examined were the appropriate amount (i.e. magnitude) of compensation payable under right of entry orders under consideration; the appropriate structure of the compensation award; and to whom the compensation was payable. This document presented a review by the Farmer's Advocate Office (FAO) of the published decision of the SRB. The verbatim decision and rationale used by the SRB to award annual compensation for loss and/or ongoing nuisance and inconvenience was presented. The document could be useful to landowners as they determine their negotiation strategy when faced with considering future pipeline access agreements. The document included a discussion of the context for the decision and a case review. Specific topics that were covered included the rationale for the decision; long term effects of pipeline arguments and SRB commentary; the award and determination; and what still needs to be done. It was concluded that the SRB requires evidence in order to answer several questions regarding the magnitude of any losses, and to what degree, if any, had the nuisance, inconvenience, and loss of rights already been anticipated and factored into the operator's final offer

  14. The First Steps into a "Leaky Pipeline"

    DEFF Research Database (Denmark)

    Emerek, Ruth; Larsen, Britt Østergaard

    2011-01-01

    Research shows that the higher the level of academic positions at universities the lower the percentage of women among employees also applies at Danish universities. This may be due to a historical backlog or merely to a 'Leaky pipeline', as earlier studies have revealed that an increasing propor...

  15. Bears and pipeline construction in Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Follmann, E.H.; Hechtel, J.L. (Univ. of Alaska Fairbanks, AK (USA))

    1990-06-01

    Serious problems were encountered with bears during construction of the 1274-km trans-Alaska oil pipeline between Prudhoe Bay and Valdez. This multi-billion-dollar project traversed both black bear (Ursus americanus Pallas) and grizzly bear (U. arctos L.) habitat throughtout its entire length. Plans for dealing with anticipated problems with bears were often inadequate. Most (71%) problems occurred north of the Yukon River in a previously roadless wilderness where inadequate refuse disposal and widespread animal feeding created dangerous situations. Of the 192 officially reported bear problems associated with the Trans-Alaska Pipeline System (TAPS) (1971-1979), about 65% involved the presence of bears in camps or dumps, 13% the feeding of bears on garbage or handouts, 10% property damage or economic loss, 7% bears under and in buildings, and only 5% charges by bears. Remarkably, no bear-related injuries were reported, suggesting that bears became accustomed to people and did not regard them as a threat. Following construction of the TAPS there have been proposals for pipelines to transport natural gas from Prudhoe Bay to southern and Pacific-rim markets. Based on past experience, some animal control measures were developed during the planning phase for the authorized gas pipeline route in Alaska. Fences installed around 100-person survey camps were found to be effective in deterring bears in two traditionally troublesome areas. 16 refs., 7 figs., 1 tab.

  16. Pipeline or Personal Preference: Women in Engineering

    Science.gov (United States)

    Schreuders, P. D.; Mannon, S. E.; Rutherford, B.

    2009-01-01

    Although the number of women in the engineering field has increased since the 1960s, those increases have largely stagnated over the last few years. This paper re-examines the pipeline for bringing women into engineering and, based on survey data, examines the attitudes, motivations, and interests of 969 male and female engineering students.…

  17. Women Engineering Faculty: Expanding the Pipeline

    Science.gov (United States)

    Greni, Nadene Deiterman

    2006-01-01

    The purpose for this case study was to explore the features of undergraduate engineering departmental and college support that influenced the persistence of women students. Women engineering faculty members were among the participants at three Land Grant universities in the Midwest. The data revealed the theme, Expanding the Pipeline, and…

  18. Optimal Processor Assignment for Pipeline Computations

    Science.gov (United States)

    1991-10-01

    the use of ratios: initially each task is assigned a procesbuor2 the remaining proceborb are distributed in proportion to the quantities f,(1), 1 < i...algorithmns. IEEE Trans. onl Parallel and Distributed Systemns, 1 (4):470-499, October 1990. [26] P. Al. Kogge. The Architeture of Pipelined Comnputers

  19. Pipeline : Hebrew data from ETCBC to Github

    NARCIS (Netherlands)

    Roorda, Dirk

    2017-01-01

    This pipeline delivers, among other good things, a file bhsa_xx.mql.bz2 which contains all ETCBC data and research additions to it. The form is MQL, compressed, and the size is less than 30 MB. Where ever you have Emdros installed, you can query this data. If you take this file from the continuous

  20. Vibrations in pipelines of nuclear power plants

    International Nuclear Information System (INIS)

    Leal, M.R.L.V.; Bevilacqua, L.

    1984-01-01

    It is presented the main causes of vibrations in nuclear power plants pipelines to allow the identification of critical areas and correct the errors during the specification design. The methods of vibration analysis to give subsidies in the determination of the corrective providences when the problem appears during the commissioning or the generation energy, are also presented. (M.C.K.) [pt

  1. Underwater Adhesives Retrofit Pipelines with Advanced Sensors

    Science.gov (United States)

    2015-01-01

    Houston-based Astro Technology Inc. used a partnership with Johnson Space Center to pioneer an advanced fiber-optic monitoring system for offshore oil pipelines. The company's underwater adhesives allow it to retrofit older deepwater systems in order to measure pressure, temperature, strain, and flow properties, giving energy companies crucial data in real time and significantly decreasing the risk of a catastrophe.

  2. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  3. Internal Corrosion Detection in Liquids Pipelines

    Science.gov (United States)

    2012-01-01

    PHMSA project DTRS56-05-T-0005 "Development of ICDA for Liquid Petroleum Pipelines" led to the development of a Direct Assessment (DA) protocol to prioritize locations of possible internal corrosion. The underlying basis LP-ICDA is simple; corrosion ...

  4. Key Design Properties for Shipping Information Pipeline

    DEFF Research Database (Denmark)

    Jensen, Thomas; Tan, Yao-Hua

    2015-01-01

    on paper, e-mail, phone and text message, and far too costly. This paper explores the design properties for a shared information infrastructure to exchange information between all parties in the supply chain, commercial parties as well as authorities, which is called a Shipping Information Pipeline...

  5. The Effect of Landslide on Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Valkovič Vojtech

    2016-11-01

    Full Text Available The present paper deals with the calculation of stresses on the pipeline system embedded on a flexible substrate which is burdened by a landslide. As well as taking into account the probability of the influences acting on the pipe as wall thickness, and others.

  6. Runtime Modifications of Spark Data Processing Pipelines

    NARCIS (Netherlands)

    Lazovik, E.; Medema, M.; Albers, T.; Langius, E.A.F.; Lazovik, A.

    2017-01-01

    Distributed data processing systems are the standard means for large-scale data analysis in the Big Data field. These systems are based on processing pipelines where the processing is done via a composition of multiple elements or steps. In current distributed data processing systems, the code and

  7. Pipelines cathodic protection design methodologies for impressed ...

    African Journals Online (AJOL)

    Several inadequate designs of cathodically polarized offshore and onshore pipelines have been reported in Nigeria owing to design complexity and application of the cathodic protection system. The present study focused on critical and detailed approach in impressed current and sacrificial anode design calculation ...

  8. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines

    International Nuclear Information System (INIS)

    Jafalian, A.

    2004-01-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  9. Remotely operated closure device for a pipeline with a fixed pipeline flange

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The remotely operated closure is set by suspension centring on the circumference of a blank flange on the fixed pipeline flange to be closed. By operating a central actuating mechanism at the closure, the clamping levers are adjusted so that the blank flange is clamped to the pipeline flange and the two flanges are pressed together. The spring-loaded clamping levers are particularly suitable for actuating the closure with the pliers of a manipulator of a large cell. (DG) [de

  10. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  11. Stabilité des pipelines non ensouillés. Etude bibliographique Stability of Unburied Pipelines. Bibliographic Study

    OpenAIRE

    Alliot J. M.

    2006-01-01

    The integrity of an unburied subsea pipeline depends to a very large extent on its stability on the seabed along its entire length. Hence the determination of this stability is of great importance in the engineering design of pipelines. This article proposes to examine the principal problems raised by the stability of unburied pipelines in the field of soil mechanics. These problems mainly concern the reactions of the soil to pipelines and their assessment, i. e. the forces of soil resistance...

  12. Diverless pipeline repair system for deep water

    Energy Technology Data Exchange (ETDEWEB)

    Spinelli, Carlo M. [Eni Gas and Power, Milan (Italy); Fabbri, Sergio; Bachetta, Giuseppe [Saipem/SES, Venice (Italy)

    2009-07-01

    SiRCoS (Sistema Riparazione Condotte Sottomarine) is a diverless pipeline repair system composed of a suite of tools to perform a reliable subsea pipeline repair intervention in deep and ultra deep water which has been on the ground of the long lasting experience of Eni and Saipem in designing, laying and operating deep water pipelines. The key element of SiRCoS is a Connection System comprising two end connectors and a repair spool piece to replace a damaged pipeline section. A Repair Clamp with elastomeric seals is also available for pipe local damages. The Connection System is based on pipe cold forging process, consisting in swaging the pipe inside connectors with suitable profile, by using high pressure seawater. Three swaging operations have to be performed to replace the damaged pipe length. This technology has been developed through extensive theoretical work and laboratory testing, ending in a Type Approval by DNV over pipe sizes ranging from 20 inches to 48 inches OD. A complete SiRCoS system has been realised for the Green Stream pipeline, thoroughly tested in workshop as well as in shallow water and is now ready, in the event of an emergency situation.The key functional requirements for the system are: diverless repair intervention and fully piggability after repair. Eni owns this technology and is now available to other operators under Repair Club arrangement providing stand-by repair services carried out by Saipem Energy Services. The paper gives a description of the main features of the Repair System as well as an insight into the technological developments on pipe cold forging reliability and long term duration evaluation. (author)

  13. Kepler Science Operations Center Pipeline Framework

    Science.gov (United States)

    Klaus, Todd C.; McCauliff, Sean; Cote, Miles T.; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Middour, Christopher; Caldwell, Douglas A.; Jenkins, Jon M.

    2010-01-01

    The Kepler mission is designed to continuously monitor up to 170,000 stars at a 30 minute cadence for 3.5 years searching for Earth-size planets. The data are processed at the Science Operations Center (SOC) at NASA Ames Research Center. Because of the large volume of data and the memory and CPU-intensive nature of the analysis, significant computing hardware is required. We have developed generic pipeline framework software that is used to distribute and synchronize the processing across a cluster of CPUs and to manage the resulting products. The framework is written in Java and is therefore platform-independent, and scales from a single, standalone workstation (for development and research on small data sets) to a full cluster of homogeneous or heterogeneous hardware with minimal configuration changes. A plug-in architecture provides customized control of the unit of work without the need to modify the framework itself. Distributed transaction services provide for atomic storage of pipeline products for a unit of work across a relational database and the custom Kepler DB. Generic parameter management and data accountability services are provided to record the parameter values, software versions, and other meta-data used for each pipeline execution. A graphical console allows for the configuration, execution, and monitoring of pipelines. An alert and metrics subsystem is used to monitor the health and performance of the pipeline. The framework was developed for the Kepler project based on Kepler requirements, but the framework itself is generic and could be used for a variety of applications where these features are needed.

  14. Advances in riser and pipeline technologies

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Wan C.; Mortazavi, Mehrdad; Weir, Michael S. [ExxonMobil Development Company, Dallas, TX (United States)

    2009-12-19

    As oil and gas production continues to move into new frontier areas, novel applications of the existing riser and pipeline technologies need to be developed to meet the often more stringent requirements encountered in these environments. The challenges include ultra deep water, harsh environments, aggressive fluid conditions, and local content objectives, etc. They will require industry to constantly extend, expand, and enhance the broad range of solution options. Also, the existing design criteria in industry may need to be revised or new criteria may need to be developed to satisfy these needs. Exxon Mobil (Em) employs, and works with others in industry to promote robust design and operating practices. This approach requires in-depth understanding, sound engineering principles, advanced analysis, uncertainty management, and supportive qualification test data. It enables confident selection, extrapolation, and innovation of technologies to address new riser system and pipeline challenges. Focus on fundamental is imperative to ensure integrity of the selected systems during fabrication, installation, and operation phases. Recent and past project experience in deep water Gulf of Mexico and West Africa provides many successful examples of this approach. This paper reviews several examples of the key riser system and pipeline technology enhancements recently achieved by EM to provide confidence in addressing technical and project application challenges. Riser system technology enhancements addressed in this paper include steel catenary riser (SCR) application on turret-moored FPSO with severe motions, pipe-in-pipe (PIP) hybrid production riser to effectively manage gas lift and flow assurance requirements, irregular wave analysis methodology for flexible risers and umbilicals to reduce conservatism, and qualification of riser and pipeline VIV prediction and mitigation methods. Pipeline technology enhancements detailed in this paper include lateral buckling prediction

  15. Data processing pipeline for Herschel HIFI

    Science.gov (United States)

    Shipman, R. F.; Beaulieu, S. F.; Teyssier, D.; Morris, P.; Rengel, M.; McCoey, C.; Edwards, K.; Kester, D.; Lorenzani, A.; Coeur-Joly, O.; Melchior, M.; Xie, J.; Sanchez, E.; Zaal, P.; Avruch, I.; Borys, C.; Braine, J.; Comito, C.; Delforge, B.; Herpin, F.; Hoac, A.; Kwon, W.; Lord, S. D.; Marston, A.; Mueller, M.; Olberg, M.; Ossenkopf, V.; Puga, E.; Akyilmaz-Yabaci, M.

    2017-12-01

    Context. The HIFI instrument on the Herschel Space Observatory performed over 9100 astronomical observations, almost 900 of which were calibration observations in the course of the nearly four-year Herschel mission. The data from each observation had to be converted from raw telemetry into calibrated products and were included in the Herschel Science Archive. Aims: The HIFI pipeline was designed to provide robust conversion from raw telemetry into calibrated data throughout all phases of the HIFI missions. Pre-launch laboratory testing was supported as were routine mission operations. Methods: A modular software design allowed components to be easily added, removed, amended and/or extended as the understanding of the HIFI data developed during and after mission operations. Results: The HIFI pipeline processed data from all HIFI observing modes within the Herschel automated processing environment as well as within an interactive environment. The same software can be used by the general astronomical community to reprocess any standard HIFI observation. The pipeline also recorded the consistency of processing results and provided automated quality reports. Many pipeline modules were in use since the HIFI pre-launch instrument level testing. Conclusions: Processing in steps facilitated data analysis to discover and address instrument artefacts and uncertainties. The availability of the same pipeline components from pre-launch throughout the mission made for well-understood, tested, and stable processing. A smooth transition from one phase to the next significantly enhanced processing reliability and robustness. Herschel was an ESA space observatory with science instruments provided by European-led Principal Investigator consortia and with important participation from NASA.

  16. PLUGGING AND UNPLUGGING OF WASTE TRANSFER PIPELINES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    This project, which began in FY97, involves both the flow loop research on plugging and unplugging of waste transfer pipelines, and the large-scale industrial equipment test of plugging locating and unplugging technologies. In FY98, the related work was performed under the project name ''Mixing, Settling, and Pipe Unplugging of Waste Transfer Lines.'' The mixing, settling, and pipeline plugging and unplugging are critical to the design and maintenance of a waste transfer pipeline system, especially for the High-Level Waste (HLW) pipeline transfer. The major objective of this work is to recreate pipeline plugging conditions for equipment testing of plug locating and removal and to provide systematic operating data for modification of equipment design and enhancement of performance of waste transfer lines used at DOE sites. As the waste tank clean-out and decommissioning program becomes active at the DOE sites, there is an increasing potential that the waste slurry transfer lines will become plugged and unable to transport waste slurry from one tank to another or from the mixing tank to processing facilities. Transfer systems may potentially become plugged if the solids concentration of the material being transferred increases beyond the capability of the prime mover or if upstream mixing is inadequately performed. Plugging can occur due to the solids' settling in either the mixing tank, the pumping system, or the transfer lines. In order to enhance and optimize the slurry's removal and transfer, refined and reliable data on the mixing, sampling, and pipe unplugging systems must be obtained based on both laboratory-scale and simulated in-situ operating conditions

  17. Energy cost reduction in oil pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Limeira, Fabio Machado; Correa, Joao Luiz Lavoura; Costa, Luciano Macedo Josino da; Silva, Jose Luiz da; Henriques, Fausto Metzger Pessanha [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    One of the key questions of modern society consists on the rational use of the planet's natural resources and energy. Due to the lack of energy, many companies are forced to reduce their workload, especially during peak hours, because residential demand reaches its top and there is not enough energy to fulfill the needs of all users, which affects major industries. Therefore, using energy more wisely has become a strategic issue for any company, due to the limited supply and also for the excessive cost it represents. With the objective of saving energy and reducing costs for oil pipelines, it has been identified that the increase in energy consumption is primordially related to pumping stations and also by the way many facilities are operated, that is, differently from what was originally designed. Realizing this opportunity, in order to optimize the process, this article intends to examine the possibility of gains evaluating alternatives regarding changes in the pump scheme configuration and non-use of pump stations at peak hours. Initially, an oil pipeline with potential to reduce energy costs was chosen being followed by a history analysis, in order to confirm if there was sufficient room to change the operation mode. After confirming the pipeline choice, the system is briefly described and the literature is reviewed, explaining how the energy cost is calculated and also the main characteristics of a pumping system in series and in parallel. In that sequence, technically feasible alternatives are studied in order to operate and also to negotiate the energy demand contract. Finally, costs are calculated to identify the most economical alternative, that is, for a scenario with no increase in the actual transported volume of the pipeline and for another scenario that considers an increase of about 20%. The conclusion of this study indicates that the chosen pipeline can achieve a reduction on energy costs of up to 25% without the need for investments in new

  18. Neutron backscattered application in investigation for Pipeline Intelligent Gauge (PIG) tracking in RAYMINTEX matrix pipeline

    International Nuclear Information System (INIS)

    Mohd Fakarudin Badul Rahman; Ismail Mustapha; Nor Paiza Mohd Hasan; Pairu Ibrahim; Airwan Affandi Mahmood; Mior Ahmad Khusaini Adnan; Najib Mohammed Zakey

    2012-01-01

    The Radiation Vulcanized Natural Rubber Latex (RVNRL) process plants such RAYMINTEX, pipelines are used extensively to transfer a latex product from storage vessel and being irradiated to produce a high quality of latex. A hydraulically activated Pipeline Intelligent Gauge (PIG) was held back against the latex flow. Consequently, the stuck PIG in pipeline was subjected to interrupt plant operation. The investigation was carried out using the neutron backscattered technique scanner to track the stuck PIG in pipeline of RVNRL plant. The 50 mCi Americium Beryllium (AmBe 241 ) fast neutron emitter source in the range 0.5-11 MeV has been used and thermal neutrons in the 30 eV- 0.5 MeV was detected using Helium-3 (He 3 ) detector. It is observed that there is unambiguous relationship between vapour and RVNRL consequence of diverse hydrogen concentration in pipeline. Thus, neutron backscattered technique was capable to determine the location of stuck PIG in a RVNRL pipeline. (author)

  19. 76 FR 54531 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes

    Science.gov (United States)

    2011-09-01

    ... prescribed in Sec. 195.452(h).'' Operators of shallow-water gas and hazardous liquid pipelines in the Gulf of... pipeline safety: 1. Identify persons who normally engage in shallow-water commercial fishing, shrimping... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...

  20. Economic evaluation of CO2 pipeline transport in China

    International Nuclear Information System (INIS)

    Zhang Dongjie; Wang Zhe; Sun Jining; Zhang Lili; Li Zheng

    2012-01-01

    Highlights: ► We build a static hydrodynamic model of CO 2 pipeline for CCS application. ► We study the impact on pressure drop of pipeline by viscosity, density and elevation. ► We point out that density has a bigger impact on pressure drop than viscosity. ► We suggest dense phase transport is preferred than supercritical state. ► We present cost-optimal pipeline diameters for different flowrates and distances. - Abstract: Carbon capture and sequestration (CCS) is an important option for CO 2 mitigation and an optimized CO 2 pipeline transport system is necessary for large scale CCS implementation. In the present work, a hydrodynamic model for CO 2 pipeline transport was built up and the hydrodynamic performances of CO 2 pipeline as well as the impacts of multiple factors on pressure drop behavior along the pipeline were studied. Based on the model, an economic model was established to optimize the CO 2 pipeline transport system economically and to evaluate the unit transport cost of CO 2 pipeline in China. The hydrodynamic model results show that pipe diameter, soil temperature, and pipeline elevation change have significant influence on the pressure drop behavior of CO 2 in the pipeline. The design of pipeline system, including pipeline diameter and number of boosters etc., was optimized to achieve a lowest unit CO 2 transport cost. In regarding to the unit cost, when the transport flow rate and distance are between 1–5 MtCO 2 /year and 100–500 km, respectively, the unit CO 2 transport cost mainly lies between 0.1–0.6 RMB/(tCO 2 km) and electricity consumption cost of the pipeline inlet compressor was found to take more than 60% of the total cost. The present work provides reference for CO 2 transport pipeline design and for feasibility evaluation of potential CCS projects in China.

  1. Efeitos multiplicadores da economia florestal brasileira

    Directory of Open Access Journals (Sweden)

    Valverde Sebastião Renato

    2003-01-01

    Full Text Available Este trabalho trata da importância do setor florestal para o desenvolvimento socioeconômico brasileiro por meio dos modelos econômicos de equilíbrio geral multissetoriais, através das análises das matrizes de insumo-produto (MIP e de contabilidade social (MCS. As principais fontes dos dados foram as Tabelas de Insumo-Produto (TIP do Instituto Brasileiro de Geografia e Estatística (IBGE, além de informações obtidas no Banco Nacional de Desenvolvimento Econômico e Social (BNDES, no Banco Central (BACEN e na Secretaria da Receita Federal (SRF, referentes ao ano de 1995. Observou-se que tão importante quanto contribuir para a geração e formação do PIB, de emprego, impostos, salários e balança comercial é o poder que um setor produtivo tem a mais que o outro de multiplicar estes indicadores quando uma unidade monetária é gasta a mais pelos consumidores finais na demanda por produtos deste determinado setor. Os resultados indicaram que o setor florestal é um dos setores da economia brasileira que apresentou os maiores efeitos multiplicadores para os indicadores socioeconômicos, sendo superiores aos de outros como o da indústria automobilística, de equipamentos elétricos e eletrônicos, de máquinas e equipamentos e de produtos químicos e petróleo.

  2. Managing the market risk in pipeline capacity positions

    International Nuclear Information System (INIS)

    Simard, T.S.

    1998-01-01

    Managing the risk involved in adding new pipeline capacity was explored in this presentation. Topics discussed included: (1) pipeline capacity positions as basis swaps, (2) physical capacity versus basis transactions, (3) managing the market price risk in a capacity position, and (4) sharing of pipeline market risk. Pipeline owners were advised to recognize that pipeline capacity carries significant market price risk, that basis markets can sometimes be more volatile than outright markets, and to treat physical capacity market risk the same way as one would treat a financial basis position. 2 figs

  3. Pipeline abandonment - a discussion paper on technical and environmental issues

    International Nuclear Information System (INIS)

    1996-11-01

    The technical and environmental issues associated with pipeline abandonment were reviewed to provide a basis for the development of guidelines that companies could follow in order to abandon oil and gas pipelines in an environmentally safe and economic manner. Some of the topics discussed include land use management, ground subsidence, soil and groundwater contamination, erosion and the potential to create water conduits. A major issue still to be resolved, i.e., the legal and financial aspects of pipeline abandonment, was addressed. An industry-financed fund has been created to cover the cost of reclamation and abandonment of orphaned pipelines and certain associated pipeline facilities. 30 refs., 4 tabs., 3 figs

  4. An integrated system for pipeline condition monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Strong, Andrew P.; Lees, Gareth; Hartog, Arthur; Twohig, Richard; Kader, Kamal; Hilton, Graeme; Mullens, Stephen; Khlybov, Artem [Schlumberger, Southampton (United Kingdom); Sanderson, Norman [BP Exploration, Sunbury (United Kingdom)

    2009-07-01

    In this paper we present the unique and innovative 'Integriti' pipeline and flow line integrity monitoring system developed by Schlumberger in collaboration with BP. The system uses optical fiber distributed sensors to provide simultaneous distributed measurements of temperature, strain and vibration for the detection, monitoring, and location of events including: Third Party Interference (TPI), including multiple simultaneous disturbances; geo-hazards and landslides; gas and oil leaks; permafrost protection. The Integriti technology also provides a unique means for tracking the progress of cleaning and instrumented pigs using existing optical telecom and data communications cables buried close to pipelines. The Integriti solution provides a unique and proactive approach to pipeline integrity management. It performs analysis of a combination of measurands to provide the pipeline operator with an event recognition and location capability, in effect providing a hazard warning system, and offering the operator the potential to take early action to prevent loss. Through the use of remote, optically powered amplification, an unprecedented detection range of 100 km is possible without the need for any electronics and therefore remote power in the field. A system can thus monitor 200 km of pipeline when configured to monitor 100 km upstream and downstream from a single location. As well as detecting conditions and events leading to leaks, this fully integrated system provides a means of detecting and locating small leaks in gas pipelines below the threshold of present online leak detection systems based on monitoring flow parameters. Other significant benefits include: potential reductions in construction costs; enhancement of the operator's existing integrity management program; potential reductions in surveillance costs and HSE risks. In addition to onshore pipeline systems this combination of functionality and range is available for practicable

  5. Pipeline corridors through wetlands - summary of seventeen plant-community studies at ten wetland crossings. Topical report, February 1990--August 1994

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Argonne National Lab., IL (United States)]|[Trinity Christian College, Palos Heights, IL (United States); Shem, L.M.; Wilkey, P.L.; Zimmerman, R.E.; Alsum, S.K. [Argonne National Lab., IL (United States)

    1994-12-01

    As part of the Gas Research Institute Wetland Corridors Program, Argonne National Laboratory conducted field studies on 10 wetland crossings located in six states to document impacts of natural gas pipeline rights-of-way (ROWS) on 15 wetland plant communities. This study is unique in the number, range, ages, and variety of wetland crossings surveyed and compared. Vegetation data and recorded observations were analyzed to reveal patterns associated with age, installation technology, maintenance practices, and wetland type. This report summarizes the findings of this study. Results revealed that ROWs of pipelines installed according to recent wetland regulations rapidly revegetated with dense and diverse plant communities. The ROW plant communities were similar to those in the adjacent natural areas in species richness, wetland indicator values, and percentages of native species. The ROW plant communities developed from naturally available propagules without fertilization, liming, or artificial seeding. ROWs contributed to increased habitat and plant species diversity in the wetland. There was little evidence that they degrade the wetland by providing avenues for the spread of invasive and normative plant species. Most impacts are temporal in nature, decreasing rapidly during the first several years and more slowly thereafter to the extent permitted by maintenance and other ROW activities.

  6. The importance of environmental communications in gas pipeline projects; A importancia da pre-comunicacao ambiental no licenciamento, implantacao e operacao de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Marcia Bartolini; Sarno, Ruy Alberto Campos [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The Environmental Pre-Communication is a tool developed to identify the profiles of communities surrounding the marked area (lifestyle, resources, fragilities, beliefs, culture and wishes), how they make their living, and production (community dependence relationship with ecosystems, such as rivers and subsistence areas), social organization, needs and expectations. Besides developing a social economic diagnostic, pre-communication prepares a community perception study. Regarding gas pipelines, the area of study comprehends 200 m towards each side of gas pipeline right-of-way in rural areas and 400 m towards each side in urban areas. Pre-Communication diagnostic, which is included in the process of environmental licensing, is aimed at subsidizing EIS (Environmental Impact Statement), providing data which help to elaborate mitigating and compensatory plans and programs. Moreover, diagnostic information make it possible to run public forums before Public Hearings take place, aiming at clarifying specific community issues related to construction and reduction of resistances, avoiding problems and conflicts. Also, during the entrepreneurship implementation phase, there is the advantage to know the bordering community and its daily activities, increasing the effectiveness of Environmental Programs. (author)

  7. Assessing and preparing a pipeline for in line inspection

    Energy Technology Data Exchange (ETDEWEB)

    Payne, Larry [T.D. Williamson Inc., Tulsa, OK (United States)

    2003-07-01

    In today's pipeline environment, operators around the world face new and emerging state and federal regulations requiring validation of their pipelines' integrity. In line inspection, or smart pigging, is generally the preferred methodology used to investigate metal loss and corrosion in pipelines. Although many pipelines can accommodate smart pigging, there are many pipelines that cannot, for various reasons. Those reasons can vary from not having pig launchers and receivers installed on the line to impassable bends or restrictions and general cleanliness of the pipeline itself. Pipeline cleanliness, more times than not, is one of the main reasons for inaccurate in line inspection data gathering or failed smart pig runs. (author)

  8. Method for keeping equipment and pipeline of nuclear power plant

    International Nuclear Information System (INIS)

    Okubo, Osamu.

    1990-01-01

    The present invention intends to suppress corrosion of equipments and pipelines in condensate, feedwater and feedwater heater drain systems during operation of a nuclear power plant. That is, condensate, feedwater and drain remained in equipments and pipelines just after the stopping of operation are passed through pipelines comprising only conduits, or they are introduced to a condensator passing through the pipelines and condensate pipes. Further, the remaining droplets on the inner surfaces are evaporated by the remaining heat of the equipments and the pipelines themselves. Then, the equipments and pipelines are isolated from other regions and kept. In view of the above, since condensate, feedwater and water feeder drains are introduced directly to the condensator passing through the conduits in which other equipments such as tanks and pumps are not present and are isolated and kept, corrosion of the equipments and the pipelines is suppressed and radioactive contamination is suppressed from prevailing by way of cruds. (I.S.)

  9. Improved, Low-Stress Economical Submerged Pipeline

    Science.gov (United States)

    Jones, Jack A.; Chao, Yi

    2011-01-01

    A preliminary study has shown that the use of a high-strength composite fiber cloth material may greatly reduce fabrication and deployment costs of a subsea offshore pipeline. The problem is to develop an inexpensive submerged pipeline that can safely and economically transport large quantities of fresh water, oil, and natural gas underwater for long distances. Above-water pipelines are often not feasible due to safety, cost, and environmental problems, and present, fixed-wall, submerged pipelines are often very expensive. The solution is to have a submerged, compliant-walled tube that when filled, is lighter than the surrounding medium. Some examples include compliant tubes for transporting fresh water under the ocean, for transporting crude oil underneath salt or fresh water, and for transporting high-pressure natural gas from offshore to onshore. In each case, the fluid transported is lighter than its surrounding fluid, and thus the flexible tube will tend to float. The tube should be ballasted to the ocean floor so as to limit the motion of the tube in the horizontal and vertical directions. The tube should be placed below 100-m depth to minimize biofouling and turbulence from surface storms. The tube may also have periodic pumps to maintain flow without over-pressurizing, or it can have a single pump at the beginning. The tube may have periodic valves that allow sections of the tube to be repaired or maintained. Some examples of tube materials that may be particularly suited for these applications are non-porous composite tubes made of high-performance fibers such as Kevlar, Spectra, PBO, Aramid, carbon fibers, or high-strength glass. Above-ground pipes for transporting water, oil, and natural gas have typically been fabricated from fiber-reinforced plastic or from more costly high-strength steel. Also, previous suggested subsea pipeline designs have only included heavy fixed-wall pipes that can be very expensive initially, and can be difficult and expensive

  10. Pipeline operators training and certification using thermohydraulic simulators

    Energy Technology Data Exchange (ETDEWEB)

    Barreto, Claudio V.; Plasencia C, Jose [Pontificia Universidade Catolica (PUC-Rio), Rio de Janeiro, RJ (Brazil). Nucleo de Simulacao Termohidraulica de Dutos (SIMDUT); Montalvao, Filipe; Costa, Luciano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The continuous pipeline operators training and certification of the TRANSPETRO's Pipeline National Operations Control Center (CNCO) is an essential task aiming the efficiency and safety of the oil and derivatives transport operations through the Brazilian pipeline network. For this objective, a hydraulic simulator is considered an excellent tool that allows the creation of different operational scenarios for training the pipeline hydraulic behavior as well as for testing the operator's responses to normal and abnormal real time operational conditions. The hydraulic simulator is developed based on a pipeline simulation software that supplies the hydraulic responses normally acquired from the pipeline remote units in the field. The pipeline simulation software has a communication interface system that sends and receives data to the SCADA supervisory system database. Using the SCADA graphical interface to create and to customize human machine interfaces (HMI) from which the operator/instructor has total control of the pipeline/system and instrumentation by sending commands. Therefore, it is possible to have realistic training outside of the real production systems, while acquiring experience during training hours with the operation of a real pipeline. A pilot Project was initiated at TRANSPETRO - CNCO targeting to evaluate the hydraulic simulators advantages in pipeline operators training and certification programs. The first part of the project was the development of three simulators for different pipelines. The excellent results permitted the project expansion for a total of twenty different pipelines, being implemented in training programs for pipelines presently operated by CNCO as well as for the new ones that are being migrated. The main objective of this paper is to present an overview of the implementation process and the development of a training environment through a pipe simulation environment using commercial software. This paper also presents

  11. Installation Capacity Assessment of Damaged Deepwater Pipelines

    Directory of Open Access Journals (Sweden)

    Ramasamy R.

    2014-07-01

    Full Text Available The worldwide exploration and development of subsea and deepwater reservoirs has laid down some new and old engineering challenges to the offshore pipeline industry. This requires large D/t pipelines to be installed at water depths in the vicinity of up to 2700m. The deepwater collapse and buckle propagation event is almost unavoidable as the pipe wall thickness cannot be always determined from the codes and standards due to the limit state criteria. These codes also do not consider any fabrication imperfections and sustained damages emanating from transportation and handling. The objective of this paper is to present the Finite Element Analysis (FEA of dented pipes with D/t ratio more than 45, which is outside the applicability of current design codes, and to investigate the effects on installation capacity of these various damage sizes in terms of collapse and buckle propagation.

  12. Leadership pipeline i den offentlige sektor

    DEFF Research Database (Denmark)

    Dahl, Kristian Aagaard; Molly-Søholm, Thorkil

    en rejse ind i hjertet af offentlig ledelse med fokus på lederniveauerne: topchef, funktionel chef, leder af ledere og leder af medarbejdere. Med afsæt i righoldige eksempler og fortællinger fra virkeligheden introduceres læseren for ledelsesteorien den Offentlige Leadership Pipeline, som giver...... enkelte lederniveauer og udvikle ledertalenter. Teorien byder på et detaljeret ledelsesgrundlag, hvorudfra den offentlige organisation kan bygge en professionel værdikæde for ledelse ved at forme lederprofiler, -rekruttering, -uddannelse, -evaluering m.m. Leadership Pipeline i den offentlige sektor er...... baseret på et treårigt dansk praksisorienteret forskningsprojekt med deltagelse af 15 offentlige organisationer, som repræsenterer kommunerne, regionerne og staten. Projektet har videreudviklet en af de sidste 10 års mest indflydelsesrige ledelseteorier i de største private organisationer, Leadership...

  13. Transient evaluation for LPG and oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Meliande, Patricia; Do Nascimento, Elson Antonio; Fernandes Lacerda, Rogerio [Federal Fluminense University, Niteroi, RJ (Brazil)

    2010-07-01

    In the last decades, the offshore industry has expanded thanks to the development of equipment for subsea operation. In such installations, protection equipment can be adapted to the installation's design in order to avoid surge pressure effects and ensure safety and integrity of the system, predicting transient effect is therefore very important. The purpose of this study is to predict the surge pressure on refrigerated LPG and gasoline pipelines during unpredicted closure of valves. Flowmaster software was used to carry out the simulations and its results were then validated with a methodology that applied the characteristics method based on Wylie and Streeter assumptions. Results showed that surge pressures during transient effect for both refrigerated LPG and Gasoline pipeline systems were less than the maximum allowable operating pressure and therefore no control dispositive installations are geeded. This study showed that the use of these computer models can ensure the optimization of the system and provide cost effective solutions.

  14. Pipelines, utilities plan over 150 scada systems

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that North American pipelines and utilities will spend more than $170 million on new or upgraded supervisory control and data acquisition (scada) systems during the 30-month period that commenced Sept. 1. Another $12.5 million will be spent on peripherals and consulting. Among the 699 various projects to be implemented during the period, companies will install 151 scada systems, add 154 remote-terminal units (RTUs) to existing scada units, and install 196 communications systems. Scada systems are computerized hardware and software systems that perform a set of monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  15. Automatic pipeline operation using Petri Nets

    Energy Technology Data Exchange (ETDEWEB)

    Moreira, Guilherme O. [PETROBRAS TRANSPORTE S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A pipeline operation requires several actions, attention and time from the control room operator in each of its operating phases. This article proposition is to use automation as something more than a remote control, drastically reducing the number of repetitive and routine actions needed from the operator to start and stop the system, granting more time for system supervision, decision making during critical conditions and avoiding errors caused due to the need of several actions being executed in a short period of time. To achieve these objectives the pipeline operation will be modeled as a Petri Net consisting of states, event and actions. A methodology for converting this Petri Net into a Ladder controller code will also be proposed. (author)

  16. Nova Gas`s pipeline to Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia`s peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI`s success was attributed to excellent interpersonal skills, particularly NGI`s ability to build confidence and credibility with its Thai partners.

  17. Wave Pipelining Using Self Reset Logic

    Directory of Open Access Journals (Sweden)

    Miguel E. Litvin

    2008-01-01

    Full Text Available This study presents a novel design approach combining wave pipelining and self reset logic, which provides an elegant solution at high-speed data throughput with significant savings in power and area as compared with other dynamic CMOS logic implementations. To overcome some limitations in SRL art, we employ a new SRL family, namely, dual-rail self reset logic with input disable (DRSRL-ID. These gates depict fairly constant timing parameters, specially the width of the output pulse, for varying fan-out and logic depth, helping accommodate process, supply voltage, and temperature variations (PVT. These properties simplify the implementation of wave pipelined circuits. General timing analysis is provided and compared with previous implementations. Results of circuit implementation are presented together with conclusions and future work.

  18. Pipelines to power South East Asia

    Energy Technology Data Exchange (ETDEWEB)

    Scholes, W

    1994-07-01

    European, North American and Australian pipeline companies are busy building pipelines to transport natural gas to power stations throughout South East Asia. Many countries, such as Thailand, Malaysia, Singapore and Indonesia, have economies expanding at more than eight percent a year. Cambodia and Laos are awaiting energy development. Myanmar will not only benefit from the global economic expansion but from the flourishing economies of nearby Thailand and Malaysia which are now investing in neighbouring countries, while their national petroleum companies are starting to operate worldwide. It is the ever expanding rush of industrialisation, urbanisation and the move to raise living standards throughout the region that is accelerating the need for more power stations, both gas and coal-fired, throughout South East Asia. (author)

  19. Pipelines explosion, violates Humanitarian International Right

    International Nuclear Information System (INIS)

    Carta Petrolera

    1997-01-01

    Recently and for first time, an organism of the orbit of the human rights put the finger in the wound of the problem that represents for Colombia the pipelines explosion and the social and environmental impact that those actions in this case the Defense of the People office, the institution that published a document related this denounces, in the one that sustains that the country it cannot continue of back with a serious and evident reality as the related with the explosions of pipelines. We are the only country of the world where happen these facts and enormous losses are not only causing to the Colombian economy, but rather our environmental wealth is affecting, the document, denounced the ignorance of the humanitarian international right on the part of those who apply to that class of attacks

  20. Pipelines to power South East Asia

    International Nuclear Information System (INIS)

    Scholes, W.

    1994-01-01

    European, North American and Australian pipeline companies are busy building pipelines to transport natural gas to power stations throughout South East Asia. Many countries, such as Thailand, Malaysia, Singapore and Indonesia, have economies expanding at more than eight percent a year. Cambodia and Laos are awaiting energy development. Myanmar will not only benefit from the global economic expansion but from the flourishing economies of nearby Thailand and Malaysia which are now investing in neighbouring countries, while their national petroleum companies are starting to operate worldwide. It is the ever expanding rush of industrialisation, urbanisation and the move to raise living standards throughout the region that is accelerating the need for more power stations, both gas and coal-fired, throughout South East Asia. (author)

  1. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-31

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

  2. Use of explosives in pipeline construction work

    Energy Technology Data Exchange (ETDEWEB)

    Ball, M J

    1976-08-01

    Explosives are an essential tool in Great Britain's pipeline-construction industry, with applications on dry land and under water, in trench blasting and tunneling for road and service crossings, demolition of unwanted sections, and removal of coatings. Nobels Explosive Co. Ltd. describes basic explosives operations as pertaining to the requirements of rock trenching, submarine operations, thrust-bore and tunneling operations, demolitions, and precision blasting.

  3. Pipeline dynamics subject to restraints with clearance

    International Nuclear Information System (INIS)

    Loula, A.F.D.; Guerreiro, J.N.C.

    1980-12-01

    The principle of virtual works at its incremental form, is utilized for the formulation of flat pipeline vibration problems, of elastic-plastic behavior, submitted to restraints with clearance (also with elastic-plastic behavior) and with viscous damping. The possibility of uniform movement of the support, that simulates the seismic action is also considered. The finite element method and an integration time algorithm, are utilized for the problem resolution. Some examples ilustrate the application of the development program. (Author) [pt

  4. Natural gas pipeline leaks across Washington, DC.

    Science.gov (United States)

    Jackson, Robert B; Down, Adrian; Phillips, Nathan G; Ackley, Robert C; Cook, Charles W; Plata, Desiree L; Zhao, Kaiguang

    2014-01-01

    Pipeline safety in the United States has increased in recent decades, but incidents involving natural gas pipelines still cause an average of 17 fatalities and $133 M in property damage annually. Natural gas leaks are also the largest anthropogenic source of the greenhouse gas methane (CH4) in the U.S. To reduce pipeline leakage and increase consumer safety, we deployed a Picarro G2301 Cavity Ring-Down Spectrometer in a car, mapping 5893 natural gas leaks (2.5 to 88.6 ppm CH4) across 1500 road miles of Washington, DC. The δ(13)C-isotopic signatures of the methane (-38.2‰ ± 3.9‰ s.d.) and ethane (-36.5 ± 1.1 s.d.) and the CH4:C2H6 ratios (25.5 ± 8.9 s.d.) closely matched the pipeline gas (-39.0‰ and -36.2‰ for methane and ethane; 19.0 for CH4/C2H6). Emissions from four street leaks ranged from 9200 to 38,200 L CH4 day(-1) each, comparable to natural gas used by 1.7 to 7.0 homes, respectively. At 19 tested locations, 12 potentially explosive (Grade 1) methane concentrations of 50,000 to 500,000 ppm were detected in manholes. Financial incentives and targeted programs among companies, public utility commissions, and scientists to reduce leaks and replace old cast-iron pipes will improve consumer safety and air quality, save money, and lower greenhouse gas emissions.

  5. Performance of MSGC with analog pipeline readout

    International Nuclear Information System (INIS)

    Gomez, F.; Adeva, B.; Gracia, G.; Lopez, M.A.; Nunez, T.; Pazos, A.; Plo, M.; Rodriguez, A.; Santamarina, C.; Vazquez, P.

    1997-01-01

    We analyse some of the performance characteristics of a chromium MSGC operated with Ar-DME 50%-50% in a test beam at CERN. Excellent signal-to-noise ratio and efficiency has been achieved with this gas mixture using cathode analog pipeline readout. We also determine optimal parameters for the sampling algorithm in order to work in a random trigger experiment (fixed target). (orig.)

  6. Cogeneration: A marketing opportunity for pipelines

    International Nuclear Information System (INIS)

    Ulrich, J.S.

    1992-01-01

    This chapter describes the marketing of dual-purpose power plants by pipeline companies as a long term marketing strategy for natural gas. The author uses case studies to help evaluate a company's attitude toward development of a market for cogeneration facilities. The chapter focuses on strategies for developing markets in the industrial sector and identifying customer groups that are likely to respond in like manner to a marketing strategy

  7. Optimizing the TESS Planet Finding Pipeline

    Science.gov (United States)

    Chitamitara, Aerbwong; Smith, Jeffrey C.; Tenenbaum, Peter; TESS Science Processing Operations Center

    2017-10-01

    The Transiting Exoplanet Survey Satellite (TESS) is a new NASA planet finding all-sky survey that will observe stars within 200 light years and 10-100 times brighter than that of the highly successful Kepler mission. TESS is expected to detect ~1000 planets smaller than Neptune and dozens of Earth size planets. As in the Kepler mission, the Science Processing Operations Center (SPOC) processing pipeline at NASA Ames Research center is tasked with calibrating the raw pixel data, generating systematic error corrected light curves and then detecting and validating transit signals. The Transiting Planet Search (TPS) component of the pipeline must be modified and tuned for the new data characteristics in TESS. For example, due to each sector being viewed for as little as 28 days, the pipeline will be identifying transiting planets based on a minimum of two transit signals rather than three, as in the Kepler mission. This may result in a significantly higher false positive rate. The study presented here is to measure the detection efficiency of the TESS pipeline using simulated data. Transiting planets identified by TPS are compared to transiting planets from the simulated transit model using the measured epochs, periods, transit durations and the expected detection statistic of injected transit signals (expected MES). From the comparisons, the recovery and false positive rates of TPS is measured. Measurements of recovery in TPS are then used to adjust TPS configuration parameters to maximize the planet recovery rate and minimize false detections. The improvements in recovery rate between initial TPS conditions and after various adjustments will be presented and discussed.

  8. Security Support in Continuous Deployment Pipeline

    DEFF Research Database (Denmark)

    Ullah, Faheem; Raft, Adam Johannes; Shahin, Mojtaba

    2017-01-01

    Continuous Deployment (CD) has emerged as a new practice in the software industry to continuously and automatically deploy software changes into production. Continuous Deployment Pipeline (CDP) supports CD practice by transferring the changes from the repository to production. Since most of the CDP...... penetration tools. Our findings indicate that the applied tactics improve the security of the major components (i.e., repository, continuous integration server, main server) of a CDP by controlling access to the components and establishing secure connections....

  9. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    International Nuclear Information System (INIS)

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-01-01

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures

  10. Estimation of efficiency of hydrotransport pipelines polyurethane coating application in comparison with steel pipelines

    Science.gov (United States)

    Aleksandrov, V. I.; Vasilyeva, M. A.; Pomeranets, I. B.

    2017-10-01

    The paper presents analytical calculations of specific pressure loss in hydraulic transport of the Kachkanarsky GOK iron ore processing tailing slurry. The calculations are based on the results of the experimental studies on specific pressure loss dependence upon hydraulic roughness of pipelines internal surface lined with polyurethane coating. The experiments proved that hydraulic roughness of polyurethane coating is by the factor of four smaller than that of steel pipelines, resulting in a decrease of hydraulic resistance coefficients entered into calculating formula of specific pressure loss - the Darcy-Weisbach formula. Relative and equivalent roughness coefficients are calculated for pipelines with polyurethane coating and without it. Comparative calculations show that hydrotransport pipelines polyurethane coating application is conductive to a specific energy consumption decrease in hydraulic transport of the Kachkanarsky GOC iron ore processing tailings slurry by the factor of 1.5. The experiments were performed on a laboratory hydraulic test rig with a view to estimate the character and rate of physical roughness change in pipe samples with polyurethane coating. The experiments showed that during the following 484 hours of operation, roughness changed in all pipe samples inappreciably. As a result of processing of the experimental data by the mathematical statistics methods, an empirical formula was obtained for the calculation of operating roughness of polyurethane coating surface, depending on the pipeline operating duration with iron ore processing tailings slurry.

  11. Hydrogeological considerations in northern pipeline development. [Permafrost affected by hot or chilled pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Harlan, R L

    1974-11-01

    Some of the hydrogeological implications of construction and operation of oil and gas pipelines in northern regions of Canada are considered in relation to their potential environmental impacts and those factors affecting the security of the pipeline itself. Although the extent to which water in permafrost participates in the subsurface flow regime has not been fully demonstrated, the role of liquid as well as vapor transport in frozen earth materials can be shown from theory to be highly significant; water movement rates in frozen soil are on the same order as those in unsaturated, unfrozen soil. Below 0/sup 0/C, the unfrozen water content in a fine-grained porous medium is dependent on temperature but independent of the total water content. The thermal gradient controls the rate and direction of water movement in permafrost. The groundwater stabilizes the streamflow and in the absence of large lakes provides the main source of flow during the winter. As groundwater is frequently confined by the permafrost, degradation of the permafrost can have significant consequences. The thaw bulb formed around a hot oil pipeline can induce liquefactioned flow of the thawed material. A chilled pipeline could restrict groundwater movement, resulting in buildup of artesian conditions and icings. The liberation and absorption of latent heat on freezing and thawing affects the thermal regime in the ground surface. Recommendations are given for pipeline construction and areas for further study pointed out. (DLC)

  12. Maintenance optimization for subsea oil pipelines

    International Nuclear Information System (INIS)

    Castanier, Bruno; Rausand, Marvin

    2006-01-01

    In this paper, the classical PF interval model, proposed for reliability centered maintenance, is used to optimize the preventive replacement policy of a subsea oil pipeline. The pipeline is subject to failure modes that may lead to oil release and pollution of the sea. The proposed replacement policy is based on regular condition measurements of the quality of an internal pipeline coating (lining). Holes in the coating will expose the pipe material (steel) to a corrosive environment. It is, therefore, important to identify holes in the coating and take action before the corrosion penetrates the pipe wall. The model proposed in the paper can be used to determine the inspection interval that minimizes the average maintenance cost per time unit. The model formulation is outlined and illustrative examples are solved. The mathematical evaluation of the replacement policy requires numerous assumptions. These assumptions have to be tailored to the specific application. The assumptions and the data provided are included for illustrative purposes to exemplify potential results that may be obtained by using the replacement policy

  13. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  14. US DOE Pipeline Unplugging Requirements Development

    International Nuclear Information System (INIS)

    Rivera, J.; McDaniel, D.

    2009-01-01

    Department of Energy (DOE) sites around the country have an ongoing effort to transport and process several tons of radioactive waste in the form of slurry (liquids and solids) from storage tanks to processing facilities. The system of pipes used for the transportation of this waste needs technology for maintenance and for the prevention (and correction) of pipeline plugging. The unplugging technologies that have been tested and evaluated at Florida International University include ones from NuVision Engineering, AIMM and AquaMiser. NuVision's technology acts as an ocean wave does on beach erosion. It can operate on a long pipeline that has drained down below a blockage. AIMM Technology's Hydrokinetic TM process uses a sonic resonance with a cleaning water stream. This sonic resonance travels through the water stream and transfers vibration to both the pipe and the blockage. The AquaMiser line of water blasting equipment combines 15,000- to 40,000-psi water injection technology to unplug pipelines. Some sites cannot allow this level of pressure in their pipes. After reviewing the results of every test, including the benefits, advantages and disadvantages of each technology, requirements were developed for pressure, personnel training, environmental concerns, safety, and compatibility with current systems, operability, reliability, maintainability and cost. (authors)

  15. Natural Gas pipelines: economics of incremental capacity

    International Nuclear Information System (INIS)

    Kimber, M.

    2000-01-01

    A number of gas transmission pipeline systems in Australia exhibit capacity constraints, and yet there is little evidence of creative or innovative processes from either the service provides of the regulators which might provide a market-based response to these constraints. There is no provision in the Code in its current form to allow it to accommodate these processes. This aspect is one of many that require review to make the Code work. It is unlikely that the current members of the National Gas Pipeline Advisory Committee (NGPAC) or its advisers have sufficient understanding of the analysis of risk and the consequential commercial drivers to implement the necessary changes. As a result, the Code will increasingly lose touch with the commercial realities of the energy market and will continue to inhibit investment in new and expanded infrastructure where market risk is present. The recent report prepared for the Business Council of Australia indicates a need to re-vitalise the energy reform process. It is important for the Australian energy industry to provide leadership and advice to governments to continue the process of reform, and, in particular, to amend the Code to make it more relevant. These amendments must include a mechanism by which price signals can be generated to provide timely and effective information for existing service providers or new entrants to install incremental pipeline capacity

  16. Pipeline leak detection using volatile tracers

    International Nuclear Information System (INIS)

    Thompson, G.M.; Golding, R.D.

    1993-01-01

    A method of leak detection for underground storage tanks and pipelines adds volatile tracers to the products in the tanks and analyzes the surrounding shallow soil gases for tracer vapors. This method has several advantages: the success of the test is not limited by the size and structural design of the vessels, tanks can be tested at any fill level without taking the tank out of service, the location of a leak along a pipeline is clearly marked by the location of the tracer, and liquid leaks as small as 0.2 liters per hour (lph) can be detected. A limitation is: the backfill material must have some degree of air permeability in the zone above the water table. Several field tests document the success achieved using this method. A tracer leak detection system was installed at Homestead AFB after several other testing methods failed to locate a leak at a valve pit location along approximately 4 kilometers of fuel transfer piping. The leak was detected to the side of the valve pit at a depth of approximately 2.5 meters below the ground surface. Another installation of Edwards AFB involved the collection of 415 soil gas samples along approximately 3,050 meters of 15.25-centimeter fiberglass pipeline. Fourteen separate leaks were detected

  17. KENYA’S OIL PIPELINE AND TERRORISM

    Directory of Open Access Journals (Sweden)

    E.O.S.ODHIAMBO

    2014-04-01

    Full Text Available The threat of Al-Shabaab and Al-Qaeda terrorist attacks on the critical infrastructure (oil pipeline in Kenya has brought to the attention the strategic issue of the energy sector security, highlighting the potential vulnerabilities of this sector. Critical Infrastructure Protection (CIP should be a key component of the national security especially after the Kenya Defence Forces’ (KDF incursion into Somalia. The merger of Al-Shabaab and Al-Qaeda terrorist groups and the accelerated grenades attack against Kenya in retaliation has become the centre of the debate on terrorism and internal security of the Kenya. The energy resources are strategic assets from the security, political and economic point of view. Kenya as an oil transit country is considered of primary strategic importance at international level. International terrorism has always looked with interest at the oil resource in order to meet its political and economic targets. We argue that Kenya’s oil pipelines are vulnerable to Al-Shabaab and Al-Qaeda terrorist attack. In summary, the article looks at the concept of terrorism within the framework of critical infrastructure protection, the dangers of attacks on oil pipelines, Kenya’s government preparedness and recommendations.

  18. A microscale protein NMR sample screening pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, Paolo; Swapna, G. V. T.; Huang, Yuanpeng J.; Aramini, James M. [State University of New Jersey, Center for Advanced Biotechnology and Medicine, Department of Molecular Biology and Biochemistry, Rutgers (United States); Anklin, Clemens [Bruker Biospin Corporation (United States); Conover, Kenith; Hamilton, Keith; Xiao, Rong; Acton, Thomas B.; Ertekin, Asli; Everett, John K.; Montelione, Gaetano T., E-mail: guy@cabm.rutgers.ed [State University of New Jersey, Center for Advanced Biotechnology and Medicine, Department of Molecular Biology and Biochemistry, Rutgers (United States)

    2010-01-15

    As part of efforts to develop improved methods for NMR protein sample preparation and structure determination, the Northeast Structural Genomics Consortium (NESG) has implemented an NMR screening pipeline for protein target selection, construct optimization, and buffer optimization, incorporating efficient microscale NMR screening of proteins using a micro-cryoprobe. The process is feasible because the newest generation probe requires only small amounts of protein, typically 30-200 {mu}g in 8-35 {mu}l volume. Extensive automation has been made possible by the combination of database tools, mechanization of key process steps, and the use of a micro-cryoprobe that gives excellent data while requiring little optimization and manual setup. In this perspective, we describe the overall process used by the NESG for screening NMR samples as part of a sample optimization process, assessing optimal construct design and solution conditions, as well as for determining protein rotational correlation times in order to assess protein oligomerization states. Database infrastructure has been developed to allow for flexible implementation of new screening protocols and harvesting of the resulting output. The NESG micro NMR screening pipeline has also been used for detergent screening of membrane proteins. Descriptions of the individual steps in the NESG NMR sample design, production, and screening pipeline are presented in the format of a standard operating procedure.

  19. Pipelines and salmon in northern British Columbia : potential impacts

    International Nuclear Information System (INIS)

    Levy, D.A.

    2009-10-01

    Four pipeline projects have been proposed for northern British Columbia that could threaten the health of the Fraser, Skeena, and Kitimat watersheds. The pipelines will expose salmon to risks on several fronts. Enbridge's Northern Gateway pipeline project has generated the most concern for a several reasons, including the risks to salmon and freshwater habitat from pipeline failures, notably leaks or ruptures. This paper reviewed the salmon resources in affected watersheds; salmon and BC's economy; salmon diversity and abundance; impacts on fish from pipeline construction, operations and failures; behaviours of different petroleum products in fresh water; hydrocarbon toxicity; history of pipeline failures; sabotage and natural disasters; and Canadian case studies. Salmon are already experiencing stresses from forestry, hydro-electricity, transportation, agriculture, mining, mountain pine beetle, climate change and coalbed methane development. Their cumulative impact will dictate the long-term health and viability of salmon. It was concluded that if all of the proposed pipelines were built, they would extend over 4,000 km, crossing more than 1,000 rivers and streams in some of Canada's most productive salmon habitat. During construction, pipeline stream crossings are vulnerable to increased sedimentation, which can degrade salmon habitat. In the event of a spill, the condensate and oil sands products carried in the pipelines are highly toxic to salmon, with serious and lasting adverse impacts on salmon and their habitat. Any decision to approve such a pipeline should be made in recognition of these risks. 73 refs., 5 tabs., 15 figs., 2 appendices.

  20. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.