  1. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  2. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  3. Tunnels: different construction methods and its use for pipelines installation

    Energy Technology Data Exchange (ETDEWEB)

    Mattos, Tales; Soares, Ana Cecilia; Assis, Slow de; Bolsonaro, Ralfo; Sanandres, Simon [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In a continental dimensions country like Brazil, the pipeline modal faces the challenge of opening ROW's in the most different kind of soils with the most different geomorphology. To safely fulfill the pipeline construction demand, the ROW opening uses all techniques in earthworks and route definition and, where is necessary, no digging techniques like horizontal directional drilling, micro tunneling and also full size tunnels design for pipelines installation in high topography terrains to avoid geotechnical risks. PETROBRAS has already used the tunnel technique to cross higher terrains with great construction difficult, and mainly to make it pipeline maintenance and operation easier. For the GASBOL Project, in Aparados da Serra region and in GASYRG, in Bolivia, two tunnels were opened with approximately 700 meters and 2,000 meters each one. The GASBOL Project had the particularity of being a gallery with only one excavation face, finishing under the hill and from this point was drilled a vertical shaft was drilled until the top to install the pipeline section, while in GASYRG Project the tunnel had two excavation faces. Currently, two projects are under development with tunnels, one of then is the Caraguatatuba-Taubate gas pipeline (GASTAU), with a 5 km tunnel, with the same concepts of the GASBOL tunnel, with a gallery to be opened with the use of a TBM (Tunneling Boring Machine), and a shaft to the surface, and the gas pipeline Cabiunas-Reduc III (GASDUC III) project is under construction with a 3.7 km tunnel, like the GASYRG tunnel with two faces. This paper presents the main excavation tunneling methods, conventional and mechanized, presenting the most relevant characteristics from both and, in particular, the use of tunnels for pipelines installation. (author)

  4. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  5. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  6. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  7. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  8. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  9. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  10. Alberta benefits : economic impacts of northern gas pipeline construction

    International Nuclear Information System (INIS)

    Rylska, N.L.; Graebeiel, J.E.; Mirus, R.K.; Janzen, S.S.; Frost, R.J.

    2003-11-01

    This paper describes the potential economic impact and benefits to Alberta from the proposed development of the Alaska Highway Pipeline (AHP) and the Mackenzie Valley Pipeline (MVP). It also includes a planning framework for business and industry in the province. Each proposed pipeline was evaluated separately. The paper includes a list of Alberta companies that stand to benefit from the construction of one or both pipelines. The main findings indicate that northern pipeline development will bring opportunities to Alberta business in design, construction and management. There will be a secondary impact on petrochemical industries and infrastructure. Both pipeline developments will increase employment and yield billions of dollars in gross domestic product. The existing oil and gas industry in Alberta will receive value-added opportunities in areas of specialized expertise such as natural gas and natural gas liquid storage, natural gas liquid processing, and gas to liquid technology projects. The industry will also benefit from power generation and cogeneration. The northern pipelines have the potential to improve the role of First Nations in economic development. Gas consumers in Alberta should benefit from a secure supply of gas and lower prices. refs., tabs., figs

  11. Effects of Pipeline Construction on Wetland Ecosystems: Russia-China Oil Pipeline Project (Mohe-Daqing Section)

    Energy Technology Data Exchange (ETDEWEB)

    Xiaofei Yu; Guoping Wang; Yuanchun Zou; Qiang Wang; Hongmei Zhao; Xianguo Lu (Key Lab of Wetland Ecology and Environment, Northeast Inst. of Geography and Agroecology, Changchun (China)), e-mail: wangguoping@neigae.ac.cn

    2010-07-15

    Although the multiple roles of wetland ecosystems and their value to humanity have been increasingly understood and documented in recent years, the efforts to conserve and restore wetlands are not in harmony with the press for high speed of economy growth. The degradation of wetlands is proceeding, especially in China. Russia- China Oil Pipe-line Project (Mohe-Daqing Section) has already begun in May 2009, and is ongoing. The pipeline runs through four riverine wetlands and two marshlands of Heilongjiang Province, Northeast China. Although the project has vital significance of mitigating the energy crisis as well as guaranteeing the energy security of China, it will bring a series of ecological and environmental problems, especially for wetland ecosystems

  12. Bears and pipeline construction in Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Follmann, E.H.; Hechtel, J.L. (Univ. of Alaska Fairbanks, AK (USA))

    1990-06-01

    Serious problems were encountered with bears during construction of the 1274-km trans-Alaska oil pipeline between Prudhoe Bay and Valdez. This multi-billion-dollar project traversed both black bear (Ursus americanus Pallas) and grizzly bear (U. arctos L.) habitat throughtout its entire length. Plans for dealing with anticipated problems with bears were often inadequate. Most (71%) problems occurred north of the Yukon River in a previously roadless wilderness where inadequate refuse disposal and widespread animal feeding created dangerous situations. Of the 192 officially reported bear problems associated with the Trans-Alaska Pipeline System (TAPS) (1971-1979), about 65% involved the presence of bears in camps or dumps, 13% the feeding of bears on garbage or handouts, 10% property damage or economic loss, 7% bears under and in buildings, and only 5% charges by bears. Remarkably, no bear-related injuries were reported, suggesting that bears became accustomed to people and did not regard them as a threat. Following construction of the TAPS there have been proposals for pipelines to transport natural gas from Prudhoe Bay to southern and Pacific-rim markets. Based on past experience, some animal control measures were developed during the planning phase for the authorized gas pipeline route in Alaska. Fences installed around 100-person survey camps were found to be effective in deterring bears in two traditionally troublesome areas. 16 refs., 7 figs., 1 tab.

  13. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  14. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  15. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  16. Saint John lateral pipeline project: comprehensive study report

    International Nuclear Information System (INIS)

    1999-02-01

    A descripion is given of the results of an environmental impact assessment of the construction of a natural gas pipeline that will bring gas from Maritimes and Northeast Pipeline Management Ltd.'s (M and NP) main transmission pipeline to clients in Lake Utopia and Saint John, NB. It will be 110 km long, and the Saint John lateral will join the mainline approximately 2 km south of Big Kedron Lake, NB. Various institutional, industrial, commercial and residential clients will be able to access the pipeline in the future, and it is intended to be capable of future expansion for markets along its route and for markets that become economically feasible in the future. A matrix was developed that relates environmental resources to Environmental Components of Concern (ECCs), and to the rationale for exclusion/inclusion of the ECC as a Valued Environmental Component (VECs). The positive benefits of the pipeline to clients in the Saint John area include: reduced dependence on foreign oil, fuel switching and price competition, lower air emission pollution, increased energy efficiency, and a source of energy that is secure and reliable. VECs were selected based on: concerns of various stakeholders including the public, community groups, scientific parties, Aboriginal groups, government officials and agencies, relevant regulations; relevant literature; and past evaluation experiences, including future developments of the proposed study area. Further selection of the VECs required an examination of the issues picked out via scoping to determine the ways in which the overall project could affect the ECCs, and included construction, operation, decommissioning/abandonment, malfunctions and accidents of the pipeline. The phases of the project as they impacted residually and cumulatively on the VECs were evaluated, and impacts on Valued Socio-Economic Components (VSCs) were assessed also. The mitigation efforts taken will minimize the potential effects of the project on VECs and VSCs

  17. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  18. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Burger, Chris [Patrick Engineering Inc., Lisle, IL (United States); Wortman, David [Patrick Engineering Inc., Lisle, IL (United States); Brown, Chris [Battelle Memorial Inst., Richland, WA (United States); Hassan, Syed [Gulf Interstate Engineering, Houston, TX (United States); Humphreys, Ken [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States); Willford, Mark [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States)

    2016-03-31

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration

  19. Planning international transit oil pipeline projects in Croatia

    International Nuclear Information System (INIS)

    Sekulic, G.; Vrbic, D.

    2004-01-01

    Planning and development of international oil pipeline projects are aimed primarily at enhancing the safety of crude oil supply. Pipeline development is affected by a variety of overlapping factors, such as energy - and environment-protection-related factors, as well as political, economic, legislative, social, technical and technological ones. The success of any pipeline planning, construction and operation in the present conditions will depend upon the degree to which the above factors have been brought in line with global trends. The government should create stable political, economic and legislative frameworks that will meet the global requirements of crude oil transport development. As regards (new) transportation companies, their function is to secure safe transport by providing competitive tariffs and granting environmental protection. A prerequisite for the pipeline planning is to have both major crude oil consumers and producers (as well as their economic and political integrations) consider any state or company as potential partners for crude oil transport and transit, respectively. Croatia and the JANAF transport company have been 'chosen' as one of priority routes for European supply with crude oil from the Caspian region and Russia and one of the directions for Russian crude oil export due to a number of advantages, opportunities and prospects for a successful development. Two international oil pipeline projects - the Druzba Adria Project and the Constanta-Pancevo-Omisalj-Trieste Project - are currently under consideration. The government commitment towards these projects has been documented by the Croatian Energy Development Strategy (April 2002) and by the Programme for its implementation (March 2004). JANAF has assumed the responsibility for carrying out the project preparation activities assigned to it by the Croatian Government and the pertinent ministries. Cooperation between JANAF and government institutions is an integral part of the procedure

  20. DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS

    International Nuclear Information System (INIS)

    James E. Huebler

    2002-01-01

    Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage could be prevented if potentially hazardous construction equipment could be detected and identified before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with an optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachment. The work performed in the first quarter of the project includes development of the Research Management Plan, writing a paper assessing of the state-of-the-art in encroachment and third party damage detection, and development of factors for selecting the optical fiber sensors

  1. A systematic approach for mitigating geohazards in pipeline design and construction

    Energy Technology Data Exchange (ETDEWEB)

    Hengesh, J.V.; Angell, R.G.M.; Lettis, W.R.; Bachhuber, J.L. [William Lettis and Associates Inc., Walnut Creek, CA (United States)

    2004-07-01

    The mitigation of geohazards for both onshore and offshore pipeline projects was discussed with particular reference to a detailed investigative approach used for a section of the BTC pipeline system in Turkey. Pipelines cross a variety of geological environments exposed to ground motion such as earthquakes and landslides. These geohazards must be characterized for the route selection, design and construction stages of the project. Failure to identify and mitigate these hazards at an early stage of the project can result in schedule delays, liability, repair and business interruption costs. Phased investigative approaches can be used to refine route selection and develop parameters for detailed design. The first stage of such studies involves an evaluation of conditions such as extreme terrain, earthquake activity, volcanic activity, slope failure, flooding, and river crossings. This desktop phase provides information on general geological constraints. It involves data compilation and review; development of a project geographic information system (GIS); and identification of critical issues and engineering support. The second phase of investigation involves the acquisition of detailed corridor specific data such as topography and aerial photography; development of geological strip maps; and, assessment of the pipeline corridor by an expert-level Terrain Evaluation Team (TET) with extensive knowledge of geo-engineering issues. The third and final phase of investigation involves characterization of geohazards to determine permanent ground deformation (PGD) parameters such as location, geometry, amount and direction of displacement and recurrence rates. It was suggested that in order to maximize efficiency during all stages of a pipeline project, the pipeline design team should interact through all three phases. 10 refs., 6 figs.

  2. Tunnel construction used as solution for the Cabiunas-REDUC-3 gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Teixeira, Andre N. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The construction of tunnels for pipeline routes has started being adopted as a solution for technical, environmental and safety issues in the oil and gas industry. Although it is not yet a common practice, PETROBRAS decided to use this type of construction on part of 178 extension kilometers of the main line for the Cabiunas-REDUC-3 Gas Pipeline located in the Gavioes mountains in the district of Cachoeiras de Macacu (RJ). The project implementation follows a growing trend of combining efficiency and environmental protection during its execution. Because the region is full of steep grades and is located in an environmentally sensitive area, the use of a tunnel connection removes some of the risks associated with that type of terrain. Among the many technical challenges involved in the project, one must include: access through dense forest, moving personnel, building material and equipment over step terrain and providing protection from corrosion. And as far as protecting the environment is concerned, the use of a pipeline results in a significant reduction in the loss of native vegetation and damage to the ecosystem. To increase these advantages, PETROBRAS seeks to adopt the kinds of construction methods that are most adequate for the challenge at hand, while producing the best results for the project. Whether using new or tried-and-true methods, the focus is always on perfecting the quality of service provided. (author)

  3. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  4. Challenges faced on Cacimbas-Catu gas pipeline (Gascac) construction and the technologies applied to achieve success

    Energy Technology Data Exchange (ETDEWEB)

    Ruschi, Allan; Cardos, Celina; Soares, Felipe; Mariot, Guilherme; Loureiro, Regis R [Petroleo Brasileiro S/A, Petrobras Engineering, Rio de Janeiro/ RJ (Brazil)

    2010-07-01

    The GASENE project is the largest gas pipeline constructed in Brazil in the past 10 years, it interconnects the southeast to the northeast of Brazil. The Cacimbas Catu Gas Pipeline (GASCAC) is a part of the project; it has a 28 inch diameter and is 958 km long. The aim of this paper is to present the construction and assembly process undertaken to meet the deadline and complete the GASCAC to a high quality standard. The main challenges of this project were its length, the short period for completion and the numerous geological and man-made features along the pipeline route. To overcome these difficulties, technologies that had never been used in Brazil before were employed, such as vacuum pipe lifting, bag weights and automatic welding. The GASCAC project was completed in time and with to a high standard of quality, demonstrating that strategic planning and the use of new technologies can increase productivity, quality and safety.

  5. Field experience with a novel pipe protection and monitoring system for large offshore pipeline construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Magerstaedt, Michael; Blitz, Gunther [ROSEN Swiss AG, Stans (Switzerland); Sabido, Carlos E. [ROSEN Technology and Research Center, Lingen (Germany)

    2012-07-01

    For pipe joints stored during large-scale offshore pipeline construction projects, corrosion protection as well as protection from physical damage of pipelines is very important. Integrity Management does not just start with the operation of a pipeline. In the past, with the much lower risks and cost at stake in on shore constriction, this factor was often overlooked. Sometimes, newly laid pipelines failed upon hydrostatic testing or even during operation. Causes were corrosion or damage the pipe joints took before pipeline laying. For offshore projects, the cost and consequences associated with such failures are orders of magnitude higher and must be avoided by all means. Within six months from the conception of the idea, a system was developed and deployed that protected (and in part still protects) a large number of pipe joints used in a European offshore gas pipeline project more than 2000 km. The pipe joints were physically protected from corrosion, interior contamination, and condensation. At the same time, the system provided real-time monitoring of more than 100'000 pipe joints stored at 5 storage yards distributed over 3 countries with distances of more than 1200 km apart from each other. Every single joint was identified with its location and status at every time during the storage period. Any third-party interference was transmitted to a central control room in real time as well. Protection of the pipe joints was provided vs.: corrosion of pipe joint end cutbacks exposed to the maritime climate for up to 2 years; contamination of the pipe interior by: foreign material, dirt, water, ice, animals. Third party damage to the pipe joints; damage to the protection system or to the transmission network; fire; theft of pipe joints or other equipment. System features were: modular pipe caps that, protect the pipe interior, cover both inner and outer cutback, allow ventilation of the pipe interior, continuously monitor each pipe joint for third party damage

  6. China's modern day Great Wall : the 40 inch West to East Gas Pipeline Project

    International Nuclear Information System (INIS)

    Gray, L.A.B.

    2004-01-01

    In order to fuel China's economic growth, PetroChina began construction of the West to East Natural Gas Pipeline Project (WEPP) in 2001 to transport large quantities of natural gas reserves from the Tarim Basin in the Xinjiang Autonomous Region in far western China to markets in eastern China. The WEPP is the first large diameter, cross-country pipeline project ever constructed in China, and was the first to use automatic welding and automatic ultrasonic inspection on pipelines in China. This paper addressed the management, engineering, procurement and construction challenges of the WEPP. Upon completion of the 3,800 km, 1.016 mm mainline pipeline, construction will begin on other major facilities, such 294 km of lateral line, dual fiber optic conduits with the mainline, 1,100 km of access roads, 23 metering stations, 18 pigging stations, 10 compressor stations, 16 mountain tunnels, 16 aerial crossings, 1 crossing of the Yangtze River, 3 crossings of the Yellow River, a gas control center, and SCADA system. Houston-based Universal Ensco Inc. was awarded a contract to perform a feasibility study as well as a construction supervision contract by PetroChina for the WEPP. Universal also designed a gas turbine drive compressor station at Lunnan and an electric drive compressor station at Zhengzhou. This paper demonstrated that business in China for foreign companies in the pipeline industry is evolving and several changes can be expected as the state planned economy is reformed to a free market economy. 4 refs., 5 tabs., 17 figs.

  7. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  8. Reasons for decision in the matter of Enbridge Southern Lights GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. : facilities[Application dated 9 March 2007 for the Southern Lights Project consisting of the: 1. Diluent Pipeline Project, and 2. Capacity Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-02-15

    In March 2007, Enbridge Southern Lights (ESL) GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. (EPI) applied for approvals related to the Southern Lights Project. The first component of the project involves the construction of a pipeline to transport diluent from Chicago, Illinois to Edmonton on Line 13, an existing EPI Mainline pipeline. The second component of the project involves a Capacity Replacement Project to replace the loss of southbound capacity on the EPI Mainline system resulting from the transfer of Line 13 to diluent service. The application required Board approvals for several related project components, including the transfer of ownership of EPI's Line 13 to ESL; the removal of Line 13 from southbound crude oil delivery service; reversing the flow on Line 13 to carry diluent from the Canada/US border northbound to Edmonton, Alberta; constructing a new oil pipeline to transport light sour crude oil; physical changes and alterations to EPI's Line 2; and, appropriate tolls and tariffs. The Board determined that the Southern Lights Project is an innovative and cost-effective solution to transport diluent. The applicants demonstrated sufficient diluent shipping commitments to ensure the long term viability of the pipeline. The Board found that the proposal to build new facilities on existing EPI sites and right-of-way should minimize negative impacts on area landowners, and also judged that mitigation planned for the construction phase will minimize potential adverse effects. The Board will require ESL to conduct an emergency response exercise where Line 13 crosses the South Saskatchewan River. Ongoing discussions between the applicants and Aboriginal groups, and a Heritage Resource Discovery Contingency Plan, will reduce potential impacts to traditional use sites. Having reviewed all evidence, the Board approved applications for the Southern Lights Pipeline Project, worth an estimated $247.5 million in Canadian spending

  9. Gas elephants: Arctic projects revived by expanding markets and pipelines

    International Nuclear Information System (INIS)

    Jaremko, G.

    2000-01-01

    The revival of interest in Arctic natural gas and the developing competition to extend the pipeline grid to Alaska and the Yukon and the Northwest territories are the subject of this report. Substantial agreement between competing interest groups is reported with respect to the need for Arctic gas and the willingness of the market to pay for bringing it south to consumers. The discussion centers on the construction of the Alliance Pipeline Project that will reportedly bring two billion cubic feet per day of excess capacity to transport natural gas from northeastern British Columbia to Chicago, and the 2,400 km long Foothills Pipelines System that carries about one-third of Canadian gas exports to middle-western states and California. Plans are to extend the line to 5,240 km by laying pipe in a giant Y pattern between Prudhoe Bay and the Mackenzie delta in the north, and the start of the Foothills System at Caroline in central Alberta. The estimated cost of the line is about $US 6 billion, using a 36-inch diameter line at increased pressures in place of the 56-inch diameter pipe used in the 1970s. Construction plans are similar for the rest of the big Y, the Dempster Lateral beside the Dempster Highway between Whitehorse and Inuvik. A competing project, the Northern Gas Pipeline Project is also discussed. This line would run east of Prudhoe Bay under the Beaufort Sea to the Mackenzie Delta; then south along the Mackenzie Valley to Alberta. Cost of this line is also estimated at $US 6 billion, however, it would have a capacity of four billion cubic feet per day, including 2.5 billion cubic feet from Alaska and 1.5 billion cubic feet from Canada. Strong revival of interest is also reported from the supply side, with BP Amoco, ARCO, Chevron Canada Resources, Ranger 0il Ltd., Paramount Resources, Berkley Petroleum Corporation, Canadian Forest Oil, Alberta Energy Company, Petro-Canada, Anderson Resources, and Poco Petroleum Ltd., all showing interest to mount new

  10. Data summary report on short-term turbidity monitoring of pipeline river crossings in the Moyie River, Boundary County, Idaho: PGT-PG&E Pipeline Expansion Project

    Energy Technology Data Exchange (ETDEWEB)

    Gowdy, M.J.; Smits, M.P.; Wilkey, P.L.; Miller, S.F.

    1994-03-01

    A water-quality monitoring program was implemented for Bechtel Corporation to measure the short-term increases in turbidity in the Moyie River caused by construction activities of the Pacific Gas Transmission-Pacific Gas & Electric Pipeline Expansion Project. Construction of the buried, 42-in.-diameter, steel pipeline, during the summer of 1992, involved eight wet crossings of the Moyie River along the 13-mi section of pipeline immediately south of the Canadian-United States border in Boundary County, Idaho. This report summarizes the sampling and analysis protocol used and gives the results and observations for each of the eight crossings. The data obtained from this monitoring program, in addition to satisfying regulatory requirements for the Pipeline Expansion Project, will contribute to an ongoing long-term study of the Moyie River crossings being performed for the Gas Research Institute by Argonne National Laboratory. The purpose of this document is strictly limited to reporting the results of the monitoring program. Interpretation of the data is not within the scope of this report.

  11. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  12. Application of pre-stressed technology in the crossing construction of the China–Myanmar Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Xuejun Wang

    2015-01-01

    Full Text Available Concrete structure is commonly used in the anchorages of a large cable-suspended pipeline crossing construction. With the increase of span and load, the stress on the concrete anchorages may rise rapidly. In case of traditional anchoring structure fixed by anchor rods, concrete cracking will occur, thereby reducing the anchorage life. To solve this problem, the pre-stressed structure was designed to effectively improve the efficiency of anchoring and reduce engineering cost. In the crossing construction of China–Myanmar Gas Pipeline, the pre-stressed technology was used to establish an effective pre-stressed anchoring system, which integrates the pre-stressed structures (e.g. tunnel anchorages in the anchors and the optimization measures (e.g. positioning mode, anchorage structure, concrete placement, pre-stressed, and medium injection, in line with the crossing structure and load features of this project. The system can delay the occurrence of concrete cracking and enhance the stress durability of the structure and anchoring efficiency. This technology has been successfully applied in the crossing construction of China–Myanmar Gas Pipeline, with good economic and social benefits, indicating that this technology is a new effective solution to the optimization of suspended pipeline anchorage structures, providing technical support for the development of pipeline crossing structure.

  13. The Independence Pipeline project : ANR's supply link - Independence Pipeline, Transco's market link

    International Nuclear Information System (INIS)

    Persells, T.

    1998-01-01

    An overview of the Independence Pipeline project was presented. The project offers access from Chicago to the U.S. Midwest market, as well as to Ontario via MichCon, Consumers Power, Great Lakes and Panhandle. The project has three components: ANR's Supply Link, the Independence Pipeline and Transco's MarketLink. The three components are budgeted at $ 1.332 billion dollars and projected for completion between Nov 1999 and Nov 2000. Each component (services, access advantages, market links, rates, storage services, etc ) are described separately. figs

  14. Slovakia should be more active in pipeline projects

    International Nuclear Information System (INIS)

    Hirman, K.

    2004-01-01

    European Union is interested also like USA to lower its own dependence on oil distributors from problematic region of Persian Gulf. Therefore the attention is turning on to Russia and to region of Caspian Sea. However except political and safety problems the import of oil from these territories meets also the lack of transport capacities. Slovakia can become the important transit territory, where could flow more Russian or Caspian oil to the European market. After a break-up of Soviet Union Russia lost oil export terminals on the coast of Baltic Sea. These terminals became a part of territories of three independent Baltic countries. The frequent storms in the region of Novorossiysk are disadvantage of Black Sea's ports Novorossiysk and Tuapse. The overloading of Turkish straits Bospor and Dardanely, which connect Black Sea and Mediterranean Sea, is becoming a new and more serious problem. In the present time up to 500 tankers swim over through these straits annually, which transport together around 70 million tones of oil and of oil products. Owing to the rising mining of oil the only one way out is the circumvention of these straits. New pipeline from Baku through Georgia to Turkish terminal Ceyhan on the coast of Mediterranean Sea is the only one but not sufficient solution. Therefore Russia promotes the project of integration of pipelines Druzba and Adria. The intensions is to open the continuous export pipeline way through Belarus, Ukraine, Slovakia and Hungary into Croatian terminal Omisajl on the coast of Adriatic Sea. Other possibility how to rise the oil transit through Slovakia is the construction of pipeline to the refinery OMW in Schweechat near Vienna. In the end of the last year the representatives of Transpetrol, Yukos and OMW signed the contract of its construction in Bratislava. Annual capacity of this pipeline is 2 million tonnes of oil. Other possibility how to transport the Caspian oil is pipeline Odessa-Brody. More then 600 km of this pipeline

  15. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities

    International Nuclear Information System (INIS)

    2008-01-01

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices

  16. A computational genomics pipeline for prokaryotic sequencing projects.

    Science.gov (United States)

    Kislyuk, Andrey O; Katz, Lee S; Agrawal, Sonia; Hagen, Matthew S; Conley, Andrew B; Jayaraman, Pushkala; Nelakuditi, Viswateja; Humphrey, Jay C; Sammons, Scott A; Govil, Dhwani; Mair, Raydel D; Tatti, Kathleen M; Tondella, Maria L; Harcourt, Brian H; Mayer, Leonard W; Jordan, I King

    2010-08-01

    New sequencing technologies have accelerated research on prokaryotic genomes and have made genome sequencing operations outside major genome sequencing centers routine. However, no off-the-shelf solution exists for the combined assembly, gene prediction, genome annotation and data presentation necessary to interpret sequencing data. The resulting requirement to invest significant resources into custom informatics support for genome sequencing projects remains a major impediment to the accessibility of high-throughput sequence data. We present a self-contained, automated high-throughput open source genome sequencing and computational genomics pipeline suitable for prokaryotic sequencing projects. The pipeline has been used at the Georgia Institute of Technology and the Centers for Disease Control and Prevention for the analysis of Neisseria meningitidis and Bordetella bronchiseptica genomes. The pipeline is capable of enhanced or manually assisted reference-based assembly using multiple assemblers and modes; gene predictor combining; and functional annotation of genes and gene products. Because every component of the pipeline is executed on a local machine with no need to access resources over the Internet, the pipeline is suitable for projects of a sensitive nature. Annotation of virulence-related features makes the pipeline particularly useful for projects working with pathogenic prokaryotes. The pipeline is licensed under the open-source GNU General Public License and available at the Georgia Tech Neisseria Base (http://nbase.biology.gatech.edu/). The pipeline is implemented with a combination of Perl, Bourne Shell and MySQL and is compatible with Linux and other Unix systems.

  17. Emissions of polluting substances in the atmosphere at construction of the pipeline Bolshoy Chagan - Atyrau

    International Nuclear Information System (INIS)

    Gilazhov, E.G.

    2005-01-01

    Full text : The main pipelines of Kazakhstan represent the most complicated mechanized and the automated hydraulic system which has been very branched out and long. It is equipped by powerful pump stations, lines and constructions of technological communication, telemechanics and automatics, fire-prevention devices, on occasion - furnaces of heating. Construction Oil and gas pipeline Bolschoy Chagan - Atyrau is intended for transportation of a mix of oil, acting on NPS Bolschoy Chagan with Karachaganak Oil and gas deposits (KNGKM), up to Atyrau for pumping in pipeline system of the Caspian pipeline consortium. The maximal volume of a transported product from Bolschoy Chagan up to pipeline KTK will make 10 million tons a year at full projected volume from KNGKM up to Atyrau - 11 million tons/years. The line Oil and gas pipeline Bolschoy Chagan - Atyrau is covered by a network of highways - soil, rural, with a covering and with the improved covering. The largest settlements located in a strip of passage of a line the following: Bolschoy Chagan, Kushum, Budarino, Chapaev, Mergenevo, Lbishchenskoe, Tajpak, Eltaj, Kulagino, Orlik, Green, Mahambet, Sarajshyk. The line Oil and gas pipeline represents a broken line in length of 455,25 km, stretched with the north on the south. The Earth, allocated under construction Oil and gas pipeline now are used for an agricultural production, mainly pasturable cattle breeding, and also in a small degree for cultivation grain, vegetable and agro cultures. According to influence of the equipment used at construction and operation Oil and gas pipeline on atmospheric air, inventory of sources of emissions is lead to an atmosphere in view of duration of work during which sources of emissions have been revealed all, total and as much as possible single emissions from stationary sources are calculated. It has been revealed, that here take place, both stationary sources of emissions, and mobile to which all motor transport concerns, and also

  18. Prospects of natural gas demand and pipeline projects in the East Asia

    International Nuclear Information System (INIS)

    Ishii, A.

    1997-01-01

    The development of the natural gas industry in East Asia was discussed. It was predicted that by 2010, the demand for natural gas could potentially reach 80 billion cubic feet per day. This represents an 8 per cent per year growth rate from a 1995 baseline. Similarly, it was predicted that by 2010, the region's natural gas supply could potentially reach 65 billion cubic feet per day which would represent 2.5 times the supply of natural gas in 1995. The additional demand will most likely be supplied from the Middle East in the form of liquefied natural gas (LNG), from Eastern Russia through pipelines of LNG, or from North America in the form of LNG. Some gas may also be supplied from Central Asia through pipelines. The price and cost of natural gas are major uncertainties in the future of the East Asian gas demand. Pipeline projects from Russia to China were discussed. Japan and Korea are also interested in collaborating on the feasibility study with Russia and China on a 3,400 km pipeline of 60 inch diameter from the Koviktinskoye gas field through Mongolia to Beijing, Tianjin and Korea, transporting 20 to 30 billion cubic metres of gas annually. A natural gas pipeline project transporting gas from the southern edge of the Sakhalin Island to the Tokyo area was also discussed. The project would involve construction of a 2,200 km 40-48 inch pipeline, much of it undersea, transporting 6 to 12 million tonnes of liquid natural gas, annually

  19. Importance of timely construction of new pipeline infrastructure to Canada and Canadians

    International Nuclear Information System (INIS)

    2005-10-01

    The results of 2 studies commissioned to quantify the economic benefits resulting from pipeline investment were presented, as well as details of the costs to Canadian residential, commercial and industrial consumers that will result from delays in the construction of new pipeline infrastructure in North America. A hypothetical $1.52 billion, 1000 km natural gas pipeline located in Alberta and British Columbia (BC) would increase Canadian Gross Domestic Product (GDP) in the order of $1.2 billion. Of the total, $202 million in GDP impacts would fall outside of the 2 provinces. In addition, a total of $856 million in labour income would be generated, including $130 million outside of Alberta and BC. The costs to Canadians from delays in the construction of the Mackenzie Valley Pipeline, Alaska Gas Pipeline and new Liquefied Natural Gas (LNG) terminals could be as much as $57.7 billion over the 2006-2025 period, with the impacts being felt mainly in Alberta and Ontario. Subsequent increases in the cost of gas to consumers will rise by $20.2 billion and $19.1 billion respectively, with a significant portion of the impact falling on Alberta's industrial sector. In Ontario, it was anticipated that 40 per cent of the impact will fall on residential gas consumers. The results of the studies highlighted the importance of timely regulatory reviews and approval of new pipeline infrastructure projects to ensure a competitive investment climate. It was concluded that when the impacts of reduced spending on other products because of higher gas bills are evaluated and combined with the first round results, the broad economic impact is expected to be profound. 6 tabs., 10 figs

  20. Landscape scale ecological monitoring as part of an EIA of major construction activities: experience at the Turkish section of the BTC crude oil pipeline project.

    Science.gov (United States)

    Sahin, Sükran; Kurum, Ekrem

    2009-09-01

    Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.

  1. Impact of the Vancouver Island natural gas pipeline construction on water quality: Project report

    Energy Technology Data Exchange (ETDEWEB)

    Li, G

    1993-01-01

    Prior to the construction of the Vancouver Island natural gas pipeline, concern was expressed for the potential defilement of community domestic water supplies when the construction work occurred in community watersheds. When drinking water becomes turbid from rainfall runoff passing through construction sites, the community disinfection process is rendered inefficacious. At a specified turbidity level, the water becomes too risky to drink without alternative disinfection such as boiling. This situation creates significant administrative problems for local health officials, intolerable social problems for residents and processing problems for industries which require clean water. This document is a review of the weekly environmental surveillance reports submitted by D. Tripp Biological Consultants to the B.C. Utilities Commission. The material is organized to relate construction practices with weather patterns thereby showing the resultant effects on water quality (turbidity).

  2. World pipeline work set for rapid growth

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion

  3. 77 FR 21763 - Explorer Pipeline Company; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2012-04-11

    ... pipeline extension project (Diluent Extension Project). The Diluent Extension Project involves the construction of a new pipeline segment from Peotone, Illinois to Manhattan, Illinois, where Explorer's pipeline system will interconnect with Enbridge's Southern Lights pipeline. This extension project will offer a...

  4. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  5. The impact of the Vancouver Island natural gas pipeline construction on water quality

    International Nuclear Information System (INIS)

    Li Gaoshe.

    1993-04-01

    A study was initiated to evaluate the impact of construction of the Vancouver Island natural gas pipeline on water quality, where the pipeline passed along or through lakes and streams. The main concern was for the potential defilement of community water supplies when construction occurred in community watersheds. When water becomes turbid from rainfall runoff passing through construction areas, disinfection processes are rendered inefficacious and at specified turbidity levels, the water becomes too risky to drink without alternative disinfection such as boiling. The weekly environmental surveillance reports generated during construction are reviewed. The material is organized to relate construction practices with weather patterns, thereby showing the resultant effects on water quality (turbidity). The effectiveness of construction measures in reducing the risk of contamination and water turbidity at intakes is assessed. Generally, water turbidity during project construction was acceptable although it sometimes reached very high levels. These high levels resulted from incidents or mistakes that were usually related to rainy days. Among the 12 types of work activity, bridge construction, drilling, and grading caused relatively slight increases in water turbidity levels, while backfilling and ditching caused the greatest increase in turbidity. Improvements in inspection and monitoring programs are recommended. A key recommendation is that construction work be stopped on rainy days. 6 refs., 4 figs., 20 tabs

  6. Technical consideration of Niigata-Sendai natural gas pipeline; Niigata Sendaikan tennen gas pipeline no seko to gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Tsujimura, O.; Sugai, H.; Koizumi, H. [Kawasaki Steel Corp., Tokyo (Japan)

    1997-09-01

    The Niigata-Sendai natural gas pipeline was constructed in 1996 by Japan Petroleum Exploration Co. to transmit indigenous gas produced off Niigata Pref. and imported gas from Indonesia in the form of LNG to Tohoku Electric Power Co.`s Sendai Thermal Power Station. It is the second longest onshore pipeline in Japan extending 251km (nominal diameter: 20in.). Kawasaki Steel participated in the construction project from the preliminary investigation and planning stage, and constructed a 97km long section, which is approximately 39% of the total length. Various new techniques were applied to secure safety and reduce cost. This paper outlines the project and some of the representative techniques adopted for the project, such as field bends cold-worked on 11m long straight pipes, work management system for constructing long-distance pipelines, coordination for the test runs and verification of the designs. 3 refs., 12 figs., 5 tabs.

  7. Construction of transmission pipeline across Osaka bay area -pipeline construction by shield tunnel under seabed-; Construction d'un gazoduc dans la zone de la baie d'Osaka - tunnel de protection sous-marin

    Energy Technology Data Exchange (ETDEWEB)

    Takashi, AIhara [Osaka Gas Co., Ltd (Japan)

    2000-07-01

    Osaka Gas has been constructing a transmission gas pipeline across Osaka Bay Area with Osaka Port that has busy traffic. The company met several technical problems on the construction-design with measures against the subsidence of reclaimed land, anti-seismic measures, for example, in designing the pipeline construction by shield tunnel under seabed. This paper introduces the solutions to the technical problems. (authors)

  8. SNPhylo: a pipeline to construct a phylogenetic tree from huge SNP data.

    Science.gov (United States)

    Lee, Tae-Ho; Guo, Hui; Wang, Xiyin; Kim, Changsoo; Paterson, Andrew H

    2014-02-26

    Phylogenetic trees are widely used for genetic and evolutionary studies in various organisms. Advanced sequencing technology has dramatically enriched data available for constructing phylogenetic trees based on single nucleotide polymorphisms (SNPs). However, massive SNP data makes it difficult to perform reliable analysis, and there has been no ready-to-use pipeline to generate phylogenetic trees from these data. We developed a new pipeline, SNPhylo, to construct phylogenetic trees based on large SNP datasets. The pipeline may enable users to construct a phylogenetic tree from three representative SNP data file formats. In addition, in order to increase reliability of a tree, the pipeline has steps such as removing low quality data and considering linkage disequilibrium. A maximum likelihood method for the inference of phylogeny is also adopted in generation of a tree in our pipeline. Using SNPhylo, users can easily produce a reliable phylogenetic tree from a large SNP data file. Thus, this pipeline can help a researcher focus more on interpretation of the results of analysis of voluminous data sets, rather than manipulations necessary to accomplish the analysis.

  9. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Science.gov (United States)

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  10. Joining the CCS Club. Insights from a Northwest European CO2 Pipeline Project

    International Nuclear Information System (INIS)

    Massol, Olivier; Tchung-Ming, Stephane

    2012-01-01

    The large-scale diffusion of Carbon Capture and Storage (CCS) imposes the construction of a sizeable CO 2 pipeline infrastructure. This paper analyzes the conditions for a widespread adoption of CCS by a group of emitters that can be connected to a common pipeline system. It details a quantitative framework capable of assessing how the tariff structure and the regulatory constraints imposed on the pipeline operator impact the overall cost of CO 2 abatement via CCS. This modeling framework is applied to the case of a real European CO 2 pipeline project. We find that the obligation to use cross-subsidy-free pipeline tariffs has a minor impact on the minimum CO 2 price required to adopt the CCS. In contrast, the obligation to charge non-discriminatory prices can either impede the adoption of CCS or significantly raises that price. Besides, we compared two alternative regulatory frameworks for CCS pipelines: a common European organization as opposed to a collection of national regulations. The results indicate that the institutional scope of that regulation has a limited impact on the adoption of CCS compared to the detailed design of the tariff structure imposed to pipeline operators. (authors)

  11. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  12. Use of pipe saks on pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Ghio, Alberto F.M.; Caciatori, Angelo [Galvao Engenharia S.A., Sao Paulo, SP (Brazil); Ruschi, Allan A.; Santos, Felipe A. dos; Barros, Horacio B. de; Loureiro, Regis R. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The use of new technologies applied to pipeline construction and assembling, aimed at enhancing productivity has been searched by PETROBRAS, throughout its subcontractors, assemblers, by transference in the mentioned constructions. Along the construction of Cacimbas Catu Pipeline, Spread 1 A, placed between the Cacimbas Gas Treatment Station (Linhares, ES) and the future Compression Station of Sao Mateus (ES), one, by means of surveys, noticed that the length of flooded or prone to flooding areas was way superior to the ones foreseen in the basic design. One of the broadly used methods for assuring buoyancy control is concreting the pipes. Such method deeply impacts work's logistics in for instance, the pipe stringing work; in this one, a maximum load of two pipes can be transported until the area to applied, what leads to lower productivity and higher risk due to the increase of trips by heavy load trucks. As an alternative to regular concrete, the Pipe Sak System was adopted and such method improved productivity and decreased discontinuities. (author)

  13. Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272

    Science.gov (United States)

    2009-12-22

    One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...

  14. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  15. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities[Application dated 28 June 2007 for the Line 4 Extension Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices.

  16. Inquiry into the Alaska road pipeline. Enquete sur le pipeline de la route de l'Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, P

    1977-01-01

    This report is addressed to the Minister of Indian Affairs and to the Canadian North in Ottawa and deals with the social and economic impacts of a proposed gas pipeline in the South of Yukon and with the attitudes of the Yukonnese people with respect to this project. Many public hearings were held. The report discusses the Yukon people (Indians and non-Indians) and the consequences of the projected pipeline on the environment, the economics of the region and the way of life of its people. The report also presents the claims of the Indians pertaining to the land. It is advocated that an advance payment of $50M be made to the Indians and that the pipeline corporation pay a compensation of at least $200M to a fund administered by the Yukon. An organization for planning and regulating the pipeline should be establised. It is advised to delay constructing the pipeline until August 1981. Other recommendations are made. Many witnesses supported a layout following roughly the Tintina groove, but none supported the Dawson deviation. Most witnesses opposed constructing the lateral Dempster pipeline for the moment. The report is illustrated with numerous colour photographs. 7 figs., 2 tabs.

  17. 77 FR 34380 - Explorer Pipeline Company; Notice of Amendment to Petition for Declaratory Order

    Science.gov (United States)

    2012-06-11

    ... structure for Explorer's proposed diluent pipeline extension project (Diluent Extension Project). In its Petition, Explorer described the Diluent Extension Project as involving the construction of a new pipeline segment from Peotone, Illinois to Manhattan, Illinois, where Explorer's pipeline system will interconnect...

  18. The SWAT approach for pipeline watercourse crossings

    Energy Technology Data Exchange (ETDEWEB)

    Jasper, Steve [WorleyParsons Calgary, Pipeline Systems Business Unit, Calgary, AB (Canada)], email: steve.jasper@worleyparsons.com; Harris, Jason D. [Triton Environmental Consultants Ltd., Terrace, British Columbia (Canada)], email: jharris@triton-env.com; Doering, Raymond [Enbridge Northern Gateway Pipelines, Calgary, AB (Canada)], email: raymond.doering@enbridge.com

    2010-07-01

    In a pipeline project, watercourse crossings are an important environmental and technical challenge. In identifying the best crossing location and method, many factors must be taken into account such as fish habitat, access, geotechnical and hydrological issues. The aim of this paper is to present a program used in a major pipeline project to assess crossings of sensitive watercourses. This program was implemented in the Enbridge Northern Gateway project which extends from Bruderheim, Alberta, to Kitimat, British Columbia, crossing over 750 watercourses. A sensitive watercourse assessment (SWAT) team composed of a fisheries biologist, a pipeline watercourse construction specialist and other personnel carried out assessments on the 200 sensitive watercourses identified. This program led to recommendations to shift the crossing location at 40% of the sensitive sites. This project showed that setting up a SWAT team be helpful in choosing the best location, method and construction timing for a crossing.

  19. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  20. Economic evaluation of pipeline construction and capacity expansion projects; Avaliacao economica dos projetos de construcao e expansao de um gasoduto de transporte

    Energy Technology Data Exchange (ETDEWEB)

    Machado, Leandro Bastos [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    In this work, two investment projects that are characteristic of the recent phase of the Brazilian natural gas industry were economically valued, taking into account the government going Thermoelectric Priority Program or PPT: economical design of a gas pipeline, to be built and operated by a Proprietary Carrier, where the interest variable is the transport tariff that will remunerate the investment and pipeline expansion through compressor stations, sponsored by the only shipper in the system, as it aims at selling gas to a thermoelectric plant, where the interest variable is the net present value of the project. In both cases, some sensitive analyses of the interest variable to variables that carry greater uncertainty are presented. Results show that pipeline expansion is viable. (author)

  1. Pipelines to eastern Canada

    International Nuclear Information System (INIS)

    Otsason, J.

    1998-01-01

    This presentation focused on four main topics: (1) the existing path of pipelines to eastern Canada, (2) the Chicago hub, (3) transport alternatives, and (4) the Vector Pipeline' expansion plans. In the eastern Canadian market, TransCanada Pipelines dominates 96 per cent of the market share and is effectively immune to expansion costs. Issues regarding the attractiveness of the Chicago hub were addressed. One attractive feature is that the Chicago hub has access to multiple supply basins including western Canada, the Gulf Coast, the mid-continent, and the Rockies. Regarding Vector Pipelines' future plans, the company proposes to construct 343 miles of pipeline from Joliet, Illinois to Dawn, Ontario. Project description included discussion of some of the perceived advantages of this route, namely, extensive storage in Michigan and south-western Ontario, the fact that the proposed pipeline traverses major markets which would mitigate excess capacity concerns, arbitrage opportunities, cost effective expansion capability reducing tolls, and likely lower landed costs in Ontario. Project schedule, costs, rates and tariffs are also discussed. tabs., figs

  2. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  3. Use of explosives in pipeline construction work

    Energy Technology Data Exchange (ETDEWEB)

    Ball, M J

    1976-08-01

    Explosives are an essential tool in Great Britain's pipeline-construction industry, with applications on dry land and under water, in trench blasting and tunneling for road and service crossings, demolition of unwanted sections, and removal of coatings. Nobels Explosive Co. Ltd. describes basic explosives operations as pertaining to the requirements of rock trenching, submarine operations, thrust-bore and tunneling operations, demolitions, and precision blasting.

  4. Ecological effects of pipeline construction through deciduous forested wetlands, Midland County, Michigan

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D. (Argonne National Lab., IL (United States)); Rastorfer, J.R. (Chicago State Univ., IL (United States). Dept. of Biological Sciences ANL/CSU Cooperative Herbarium, Chicago, IL (United States)); Van Dyke, G.D. (Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology)

    1991-07-01

    Implementation of recent federal and state regulations promulgated to protect wetlands makes information on effects of gas pipeline rights-of-way (ROWs) in wetlands essential to the gas pipeline industry. This study is designed to record vegetational changes induced by the construction of a large-diameter gas pipeline through deciduous forested wetlands. Two second-growth forested wetland sites mapped as Lenawee soils, one mature and one subjected to recent selective logging, were selected in Midland County, Michigan. Changes in the adjacent forest and successional development on the ROW are being documented. Cover-class estimates are being made for understory and ROW plant species using 1 {times}1-m quadrats. Counts are also being made for all woody species with stems < 2 cm in diameter at breast height (dbh) in the same plots used for cover-class estimates. Individual stem diameters and species counts are being recorded for all woody understory and overstory plants with stems {ge}2 cm dbh in 10 {times} 10-m plots. Although analyses of the data have not been completed, preliminary analyses indicate that some destruction of vegetation at the ROW forest edge may have been avoidable during pipeline construction. Rapid regrowth of many native wetland plant species on the ROW occurred because remnants of native vegetation and soil-bearing propagules of existing species survived on the ROW after pipeline construction and seeding operations. 91 refs., 11 figs., 3 tabs.

  5. Ecological effects of pipeline construction through deciduous forested wetlands, Midland County, Michigan

    International Nuclear Information System (INIS)

    Zellmer, S.D.; Rastorfer, J.R.; Van Dyke, G.D.

    1991-07-01

    Implementation of recent federal and state regulations promulgated to protect wetlands makes information on effects of gas pipeline rights-of-way (ROWs) in wetlands essential to the gas pipeline industry. This study is designed to record vegetational changes induced by the construction of a large-diameter gas pipeline through deciduous forested wetlands. Two second-growth forested wetland sites mapped as Lenawee soils, one mature and one subjected to recent selective logging, were selected in Midland County, Michigan. Changes in the adjacent forest and successional development on the ROW are being documented. Cover-class estimates are being made for understory and ROW plant species using 1 x1-m quadrats. Counts are also being made for all woody species with stems < 2 cm in diameter at breast height (dbh) in the same plots used for cover-class estimates. Individual stem diameters and species counts are being recorded for all woody understory and overstory plants with stems ≥2 cm dbh in 10 x 10-m plots. Although analyses of the data have not been completed, preliminary analyses indicate that some destruction of vegetation at the ROW forest edge may have been avoidable during pipeline construction. Rapid regrowth of many native wetland plant species on the ROW occurred because remnants of native vegetation and soil-bearing propagules of existing species survived on the ROW after pipeline construction and seeding operations. 91 refs., 11 figs., 3 tabs

  6. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  7. High-speed hierarchical pipeline for radiological projection data acquisition

    International Nuclear Information System (INIS)

    Kang Kejun; Wang Jingjin; Xu Qichun; Gao Wenhuan; Fu Changqing

    1993-01-01

    Modern radiological imaging system needs fast data acquisition technology of high density projection acquiring. For this reason, a new type of pipeline, which has multi-stage and hierarchical structure, was developed. By this pipeline, the dead time of the data acquisition system was greatly reduced, and then the throughput of the whole system was increased

  8. Development of cross border gas transmission projects raise challenging issues. Case studies: The transmed and the Maghreb/Europe pipelines

    International Nuclear Information System (INIS)

    Khene, D.

    1997-01-01

    Development of cross border gas transmission projects raise complex and interdependent issues whose successful resolution require not only technical and management strengths but also a close cooperation between the key players involved in the game. In this paper we shall attempt to explain some of the major issues encountered during the appraisal and construction of long distance gas pipeline schemes. The information used derive essentially from the experience gained during the development of the Trans-mediterranean and the Maghreb/Europe pipelines. Running through the various issues we shall also identify and then discuss a number of factors which contributed to the successful implementation of these two projects. (au)

  9. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  10. Logistics at the Amazon forest: the challenge of Urucu-Manaus pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Ricardo Magalhaes; Araujo, Jorge Marques de; Barbosa, Gilberto Rodrigues; Campos, Marcos Zeferino Teixeira [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The predominant difficulties and logistics complexities at the Amazon Region, required of the technical body responsible for the construction of the Undertaking Urucu-Manaus Pipeline, technological knowledge and a profound background of the regional particularities, qualities that were determinants for the execution of this significant work. The logistics solutions, supported on an accurate and adequate planning for people, equipment and material mobilization for several front services, were planned considering the constant climatic variables, river flood and dry periods and with the monitoring daily routines of the communities located around the pipeline construction influence area. (author)

  11. Impact of fractionator and pipeline projects on Gulf Coast NGL markets: 1992--1997

    International Nuclear Information System (INIS)

    Lippe, D.L.

    1993-01-01

    This paper focuses on the impact of major pipeline and fractionation expansion projects on Gulf Coast NGL supply/demand balances over the next five years. Specific projects that are included in this evaluation are summarized below: NGL pipeline expansions -- (1) Seminole pipeline, MAPCO (purity products and raw mix) and (2) Sterling pipeline, Koch (purity products); Mont Belvieu fractionator expansions -- (1) Enterprise Products Company (raw mix), (2) Warren Petroleum Company (raw mix), and (3) Trident, et al. Gulf Coast II Fractionator (raw mix); Westlake Petrochemical Company (E/P splitter). The impact of these projects is evaluated for specific NGL products including: purity ethane; E/P mix; propane; N-butane

  12. Maritimes and Northeast Pipeline : from pipe dream to reality

    International Nuclear Information System (INIS)

    Langan, P.T.

    1998-01-01

    A general project description and time schedule of the Maritimes and Northeast Pipeline project was presented. The pipeline project is a component of the Sable Offshore Energy Project which involves the development of six separate gas fields near Sable Island on the Scotian Shelf about 250 km off the south coast of Nova Scotia. The six fields under development represent about 3.5 trillion cubic feet of proven gas supply. Another 2 trillion cubic feet of gas has been discovered in nearby pools. There is an estimated additional 13 trillion cubic feet of potential gas reserve in the Scotian Shelf region. The 2 billion-dollar offshore project involves twenty-eight production wells, construction and installation of six platforms and a 225-km long two-phase pipeline from the central platform that will transport the product to shore. A gas plant will be constructed on-shore at Goldboro at which point the liquids will be stripped from the gas stream and transported by an onshore pipeline to Point Tupper, Cape Breton Island, to a fractionation facility for further market processing. The Maritimes and Northeast Pipeline will transport the gas product to markets in Nova Scotia, New Brunswick and New England. A number of unique challenges associated with the Maritimes and Northeast Pipeline project such as the problems of serving a new market, the highly competitive anchor market in the U.S., supply and operating characteristics, the regulatory process, and various competing projects were also reviewed. Sable offshore gas is scheduled to flow by late 1999

  13. Non-unions force wage cut-backs in pipeline industry

    Energy Technology Data Exchange (ETDEWEB)

    Bain, D

    1984-03-01

    Faced with another year of high unemployment and shrinking markets, Western Canada's unionized pipeline construction trades have taken a step toward stabilizing the industry. The unions have struck a bargain to combat an increasing number of non-union open shops. Management and labor cooperated to insure that the unions regain their share of the pipeline construction market. The pipeline construction boom has ended, with an overcapacity, a downturn in sales, and few major projects on the drawing boards. The bargains included wage reductions of 30%, daily living allowance reductions of nearly 50%, the elimination of double time, and the use of composite crews.

  14. Residue management in the Bolivia-Brazil gas pipeline construction

    International Nuclear Information System (INIS)

    Freitas, Eduardo Lopes; Henrique, Paulo Roberto Pereira; Cantarino, Anderson Americo Alves

    2000-01-01

    The construction of the gas pipeline is a process sequential of assembly phases, where each one of those phases generates residues of the most varied types and amounts, being necessary the forecast of your generation in agreement with the activity that is being executed. During the accomplishment of the works they are generated a lot of times situations where are observed the inadequate disposition of the residues. Those practices, besides the environmental impact that they cause, it can cart in the future, the need of additional investments be proceeded in the recovery of the areas and removal of the residues. This work presents the Program of administration of Residues instituted during the construction of the pipeline Bolivia - Brazil, seeking, on a side to reduce to the minimum the generation of residues and of the other, moths handling guidelines and disposition, in way to minimize the environmental impacts caused by the same ones. (author)

  15. Efficiency of wave impeding barrier in pipeline construction under ...

    Indian Academy of Sciences (India)

    durability and security of these pipelines are very critical for all earth habitants. Thus ... stage of project for an effective protection of the infrastructures from ground- ... computational procedure in the time domain are performed by the computer ...

  16. Cost reducing factors in effective pipeline piling structure design and construction in Alberta's thermal SAGD gathering pipeline systems

    Energy Technology Data Exchange (ETDEWEB)

    Farrokhzad, M.A. [IMV Projects, Calgary, AB (Canada)

    2008-10-15

    Oil sands steam assisted gravity drainage (SAGD) gathering pipeline systems are typically arranged so that above-ground steam pipeline and production pipelines lay next to each other on the same steel structure. Longitudinal and lateral loads build up in the pipeline supports, and the loads are consistently changing until pipeline temperatures reach a steady state condition. SAGD pipelines are required to have enough flexibility to absorb thermal expansion or contraction movements. However, most pipeline engineers only consider upper and lower temperature limits in the design of steel structures and pilings. This paper examined the effect of considering both the thermal gradient and time factor in designing supports for pipelines. The study examined how the factors impacted on standard load calculations and pile sizings. Sixteen stress analysis models for steam and production lines were prepared and designated thermal gradients were introduced to each model. Longitudinal and lateral loads caused by thermal gradient movements were calculated for all supports. The models were analyzed and absolute values for longitudinal and lateral loads were recorded. Results of the study showed that engineers do not necessarily need to rely on maximum temperatures as the condition that results in maximum longitudinal and lateral loads on supports. It was concluded that costs related to pipeline construction can be significantly reduced by considering the effects of thermal gradients in stress analyses and load calculations. 5 refs., 14 figs.

  17. Also deputies will say something to new pipeline of Slovnaft

    International Nuclear Information System (INIS)

    Marcan, P.

    2005-01-01

    The oil transit company, Transpetrol, expects the new Bratislava-Schwechat pipeline connecting the OMV refinery to the Druzba pipeline to increase the use of the pipeline and improve company revenues by 20%. The Austrian project partner, OMV, looks to the project to decrease transportation costs for Russian oil. One sixth of the 60 km pipeline will be built in Slovakia, but there is a problem - the Slovak Ministry of Environment and the City of Bratislava have not approved the route proposed by Transpetrol. In their opinion, the propose route would endanger the protected area, Zitny ostrov, that provides drinking water to the capital. Slovnaft also plans a new pipeline to replace the old obsolete one used to transport its products to the mineral oils transhipment centre at Bratislava docks. One of the alternatives proposed by Slovnaft is the construction of a pipeline and transhipment centre on Zitny ostrov. Unlike the Transpetrol project, this has already received approval from the Ministry of Environment. Before construction work on the pipeline to Schwechat can start. OMV will have resolve issues related to the supply of oil from Russia. According to the original plans, Yukos, which owns a 49% stake in Transpetrol, was to supply the oil. But due to tax problems in Russia, Yukos lost its main drilling division, Juganskneftgaz

  18. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  19. Evaluation of stream crossing methods prior to gas pipeline construction

    International Nuclear Information System (INIS)

    Murphy, M.H.; Rogers, J.S.; Ricca, A.

    1995-01-01

    Stream surveys are conducted along proposed gas pipeline routes prior to construction to assess potential impacts to stream ecosystems and to recommend preferred crossing methods. Recently, there has been a high level of scrutiny from the Public Service Commission (PSC) to conduct these stream crossings with minimal effects to the aquatic community. PSC's main concern is the effect of sediment on aquatic biota. Smaller, low flowing or intermittent streams are generally crossed using a wet crossing technique. This technique involves digging a trench for the pipeline while the stream is flowing. Sediment control measures are used to reduce sediment loads downstream. Wider, faster flowing, or protected streams are typically crossed with a dry crossing technique. A dry crossing involves placing a barrier upstream of the crossing and diverting the water around the crossing location. The pipeline trench is then dug in the dry area. O'Brien and Gere and NYSEG have jointly designed a modified wet crossing for crossing streams that exceed maximum flows for a dry crossing, and are too wide for a typical wet crossing. This method diverts water around the crossing using a pumping system, instead of constructing a dam. The trench is similar to a wet crossing, with sediment control devices in place upstream and downstream. If streams are crossed during low flow periods, the pumping system will be able to reduce the majority of water flow and volume form the crossing area, thereby reducing ecological impacts. Evaluation of effects of this crossing type on the stream biota are currently proposed and may proceed when construction begins

  20. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  1. Simplification of executive procedures for construction and assembly of terrestrial gas pipelines through illustrations

    Energy Technology Data Exchange (ETDEWEB)

    Filho, Mario D.C.; Bresci, Claudio T.; Dantas, Augusto Cesar de C.; Machado, Clara C. Torres S. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Sobreiro, Flavia L. [Telsan Engenharia, Belo Horizonte, MG (Brazil)

    2009-07-01

    This study aims to show a simple, efficient and fun method that seeks to minimize the weaknesses and help to increase the perception of risk analysis and systematization the operation discipline. This project uses the methodology of images illustrated in the executive procedures, and is based on the activities of construction and assembly, HSE and social communication in gas pipeline ventures, setting and maintaining access to practical information, yet are prepared a work instructions that summarize each process, as a form of material support in training. Among several objectives that have shaped the strategies for this project, the main is to provide the workforce engaged in the activities of field, greater facility in implementing the technical information contained in the procedures, from a wider and better understanding of the guidelines described in the documentation. (author)

  2. Complex solution of problem of all-season construction of roads and pipelines on universal composite pontoon units

    Science.gov (United States)

    Ryabkov, A. V.; Stafeeva, N. A.; Ivanov, V. A.; Zakuraev, A. F.

    2018-05-01

    A complex construction consisting of a universal floating pontoon road for laying pipelines in automatic mode on its body all year round and in any weather for Siberia and the Far North has been designed. A new method is proposed for the construction of pipelines on pontoon modules, which are made of composite materials. Pontoons made of composite materials for bedding pipelines with track-forming guides for automated wheeled transport, pipelayer, are designed. The proposed system eliminates the construction of a road along the route, ensures the buoyancy and smoothness of the self-propelled automated stacker in the form of a "centipede", which has a number of significant advantages in the construction and operation of the entire complex in the swamp and watered areas without overburden.

  3. Upgrading Algeria-Italy trans-Mediterranean natural gas pipeline

    International Nuclear Information System (INIS)

    Stella, G.

    1992-01-01

    The first trans-Mediterranean pipeline system, which went into service in 1983, had to be doubled in capacity in order to meet increased European demand for Algerian natural gas. After a brief review of the contractual, planning and construction history of the first pipeline, this paper discusses the strategies taken which led to the decision to double the line's capacity. Descriptions are then given of the different construction phases realized in Tunisia, the Sicilian Channel and Italian mainland. Focus is on construction schedules, problems and solutions. The report comes complete with details of project financing, organizing, materials supply programs, innovative technology applications, design philosophy and construction techniques

  4. Solving an unpiggable pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Walker, James R. [GE Oil and Gas, PII Pipeline Solutions, Cramlington Northumberland (United Kingdom); Kern, Michael [National Grid, New Hampshire (United Kingdom)

    2009-07-01

    Technically, any pipeline can be retrofitted to enable in line inspection. Sensibly however, the expense of excavations and construction of permanent facilities have been, in many cases, exceedingly prohibitive. Even where traditional modifications are feasible from engineering perspectives, flow interruption may not be an option - either because they are critical supply lines or because the associated lost revenues could be nearly insurmountable. Savvy pipeline integrity managers know the safety issue that is at stake over the long term. They are also well aware of the accuracy benefits that high-quality in-line inspection data offer over potentially supply disruptive alternatives such as hydrostatic testing. To complicate matters further, many operators, particularly in the US, now face regulatory pressure to assess the integrity of their yet-uninspected pipelines located in highly populated areas. This paper describes an important project National Grid undertook that made use of a unique pipeline access method that did not require permanent installation of expensive facilities required for in line inspection of a pipeline previously considered 'unpiggable'. Since the pipeline was located in an urban area, flow disruption had to be minimized. This paper will define the project background, its challenges, outcomes and lessons learned for the future. (author)

  5. Using the direct current voltage gradient technology as a quality control tool during construction of new pipelines

    CSIR Research Space (South Africa)

    Masilela, Z

    1998-06-01

    Full Text Available pipelines. This technique is now increasingly gaining popularity as a good quality control tool when used on newly laid pipelines to detect coating damage, most of which could be attributed to construction work. On a recently built 50 km long gas pipeline...

  6. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  7. Europe's gas imports via pipelines. Projects and safety aspects; Europas Gasimporte durch Pipelines. Projekte und Sicherheitsaspekte

    Energy Technology Data Exchange (ETDEWEB)

    Goetz, R.

    2008-08-15

    By the year 2030 Europe's gas imports will have risen to approximately 200 bn m{sup 3}, necessitating the installation of new pipelines and LNG terminals. The largest growth in imports is not expected from Russia but from Africa and the Near East. An analysis of projected pipelines demonstrates these regions' contribution to securing Europe's gas supply. Because they help to establish market dominance or to fend off potential competitors these pipelines also serve corporate strategies. The most reliable supply will continue to come from Norway. By contrast, gas imports via pipelines from North Africa, Russia and the Persian Gulf all carry high risks of approximately the same degree. The greatest risks are associated with gas imports from the Caspian Sea.

  8. Pipelines and salmon in northern British Columbia : potential impacts

    International Nuclear Information System (INIS)

    Levy, D.A.

    2009-10-01

    Four pipeline projects have been proposed for northern British Columbia that could threaten the health of the Fraser, Skeena, and Kitimat watersheds. The pipelines will expose salmon to risks on several fronts. Enbridge's Northern Gateway pipeline project has generated the most concern for a several reasons, including the risks to salmon and freshwater habitat from pipeline failures, notably leaks or ruptures. This paper reviewed the salmon resources in affected watersheds; salmon and BC's economy; salmon diversity and abundance; impacts on fish from pipeline construction, operations and failures; behaviours of different petroleum products in fresh water; hydrocarbon toxicity; history of pipeline failures; sabotage and natural disasters; and Canadian case studies. Salmon are already experiencing stresses from forestry, hydro-electricity, transportation, agriculture, mining, mountain pine beetle, climate change and coalbed methane development. Their cumulative impact will dictate the long-term health and viability of salmon. It was concluded that if all of the proposed pipelines were built, they would extend over 4,000 km, crossing more than 1,000 rivers and streams in some of Canada's most productive salmon habitat. During construction, pipeline stream crossings are vulnerable to increased sedimentation, which can degrade salmon habitat. In the event of a spill, the condensate and oil sands products carried in the pipelines are highly toxic to salmon, with serious and lasting adverse impacts on salmon and their habitat. Any decision to approve such a pipeline should be made in recognition of these risks. 73 refs., 5 tabs., 15 figs., 2 appendices.

  9. Seismic-safe conditions of blasting near pressure pipe-lines during power installation construction

    International Nuclear Information System (INIS)

    Smolij, N.I.; Nikitin, A.S.

    1980-01-01

    Seismic-safe conditions for performing drill-blasting operations in the vicinity of underground gas pipelines when constructing thermal- or nuclear power plants are discussed. It is shown that, for the determination of seismic-safe parameters, of drill-blasting operations, the maximum permissible level of seismic loads should be specified taking into account the mechanical properties of the pipeline.metal, structural parameters of the gas pipeline and the pressure of the medium transported. Besides, the seismic effect of the blast should be considered with regard to particular conditions of blasting and rock properties. The equations and diagrams used in the calculation are given

  10. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  11. The political economy of trans-Pakistan gas pipeline project: assessing the political and economic risks for India

    International Nuclear Information System (INIS)

    Pandian, S.

    2005-01-01

    There is a growing realisation among Indian policy makers to consider the import of natural gas to address India's growing energy demand. Among many policy options to import natural gas, Indo-Iran overland pipeline option is considered to be effective and economical in addressing India's long-term energy demands. Such a pipeline would have to traverse Pakistani territory thereby necessitating a role for Pakistan in the pipeline project. Though security guarantees have been offered, India refuses to entertain the role of Pakistan in the project for a fear of its energy supply being disrupted in case of a military conflict with Pakistan. This paper argues that gas pipeline project is not only aimed at addressing India's energy concerns but also to further its strategic objectives. This paper contends that India, Iran and Pakistan do not have shared objective to make the overland project a political and commercial reality. India's stakes in the overland pipeline project are high as India's economic interests in the pipeline project are not in congruence with the politico-economic and strategic objectives of Iran and Pakistan. (author)

  12. Reasons for decision in the matter of Enbridge Pipelines Inc. Alberta Clipper expansion project : facilities and tolls and tariffs

    International Nuclear Information System (INIS)

    2008-01-01

    In May 2007, Enbridge Pipelines Inc. applied for approval to construct the Alberta Clipper Expansion Project which consists of 1074 km of oil pipeline and associated facilities between its Hardisty, Alberta terminal and the Canada/United States border near Gretna, Manitoba. The purpose of the project is to increase the takeaway capacity out of the Western Canada Sedimentary Basin (WCSB) and into PADD 2 and eastern Canadian markets. The pipeline would have an initial capacity of 71,500 cubic metres per day. The estimated cost of the project is $2 billion with a targeted in-service data for July 2010. Public hearings into the Alberta Clipper project began in November 2007 and included an oral hearing. The Board was presented with evidence from intervenors on many issues including impacts to Aboriginal peoples and the impact of the project on domestic interests. The Board reviewed the design and operation of the proposed facilities as well as routing and land requirements. Issues regarding the environment, socio-economic matters, tolls, tariffs and economics were also addressed. The Board was satisfied from the evidence that the proposed facilities are, and will be, required by the present and future public convenience and necessity. In approving the project, the Board attached several conditions, including one that requires Enbridge to conduct an emergency response exercise at its South Saskatchewan River crossing. This condition is in response to public concerns raised during the hearing process. 11 refs., 6 tabs., 5 figs., 4 appendices

  13. Growth of pipelines : the critical enabler in achieving our energy potential

    International Nuclear Information System (INIS)

    MacInnis, D.

    2005-01-01

    Issues concerning pipeline infrastructure and development in relation to the Canadian Energy Pipeline Association (CEPA) were discussed. Ninety-five per cent of the crude oil and natural gas produced in Canada is transported by members of CEPA, which represents 2.4 mm bbl/d of oil and 16.2 Bcf/d of gas. Assets of CEPA's members are worth over CDN$20 billion, with a projected capital investment of CDN$20 billion over the next 20 years. Growth in consumer demand and issues concerning security of North American gas supply to 2025 were discussed. It was anticipated that while new sources of gas will be more costly, new supply will contribute to more moderate prices. New infrastructure needs will build on existing systems. However, timely investment will be critical to connect to supply markets. North American natural gas transmission and distribution networks will require investments of approximately $US301 billion. Ineffective regulatory processes, labour shortages and the search for competitively priced capital will result in higher energy costs to consumers. Issues concerning pipeline construction projects in Alaska and northern Canada were reviewed. The projected economic benefits of pipeline construction were examined, including details of employment created through pipeline investment. The costs to Canadian consumers of delaying pipeline construction were also outlined. It was concluded that efficient and effective policies and regulations are needed to secure energy supply in a timely manner. In addition, a competitive investment environment is needed, in which safety and sustainability are balanced by economic viability and productive trade relationships. tabs., figs

  14. Study on Resources Assessment of Coal Seams covered by Long-Distance Oil & Gas Pipelines

    Science.gov (United States)

    Han, Bing; Fu, Qiang; Pan, Wei; Hou, Hanfang

    2018-01-01

    The assessment of mineral resources covered by construction projects plays an important role in reducing the overlaying of important mineral resources and ensuring the smooth implementation of construction projects. To take a planned long-distance gas pipeline as an example, the assessment method and principles for coal resources covered by linear projects are introduced. The areas covered by multiple coal seams are determined according to the linear projection method, and the resources covered by pipelines directly and indirectly are estimated by using area segmentation method on the basis of original blocks. The research results can provide references for route optimization of projects and compensation for mining right..

  15. Improving conveyance and distribution efficiency through conversion of an open channel lateral canal to a low pressure pipeline at Al-Hassa Irrigation Project, Saudi Arabia

    International Nuclear Information System (INIS)

    Aldakheel, Y.; Zeineldin, F.

    2007-01-01

    This paper describes a field case study on the use of a semi-buried poly-vinyl chloride (PVC) pipeline system in Al-Hassa oasis, Saudi Arabia and its contribution in improving water conservation. Deteriorated concrete canals at Al-Hassa irrigation project, enhanced irrigation water losses, and the annual cost of maintenance became uneconomical for the long term. The PVC pipes easy maintenance, durability, modification and flexibility give them the potential to be an economical alternative to replace a concrete lateral canal, P1H4, at Al-Hassa irrigation project. Due to the availability of PVC pipes at low cost in the Kingdom and their common use in irrigation, they were selected to construct a pipeline, 362 m in length. An energy head, 2.7 m of water, was used in determining the pipeline capacity and its internal diameter, using the continuity equation. Dismantling of the concrete canal and installing of the pipeline took place simultaneously without water stresses to the grown crops. The conveyance and distribution efficiencies increased by 25.3% and 25% respectively due to installation of pipeline. The water use with illegal extra siphons was reduced by 29.2% under the pipeline system. (author)

  16. Engineered pipeline field joint coating solutions for demanding conditions

    Energy Technology Data Exchange (ETDEWEB)

    Lwemuchi, Andre L.; Gudme, Carl C.; Buchanan, Robert [Canusa-CPS, Toronto, OT (Canada)

    2009-12-19

    Trends in the oil and gas pipeline industry see that the demand for new technologies and engineered solutions for pipeline external coatings are increasing. In general, superior mechanical resistance and long term performance are being required in addition to operating at higher temperatures. This demand for more robust coatings has been created because of factors such as more remote fields, deep onshore reservoirs, deep water offshore fields and heavy oil that must be pumped at higher temperatures. The development of new techniques for pipeline construction is also exposing the coatings to more aggressive construction conditions. Because of this, the use of three layer and multi-layer polypropylene mainline coating systems have been growing considerably. Following this trend, the field joint coating manufacturers developed polypropylene systems and more recently had to work on engineered solutions required for recent offshore projects in Europe where very thick polypropylene field joint heat-shrinkable systems were provided. In addition, projects in remote locations such as the recently completed projects in the Brazilian Amazon required special logistics and field services. The growth of the mining industry in South America with slurry pipelines constructed in the recent years also demanded thicker, more robust coatings. The popularization of directional drilling and shore approach applications moved the industry to develop improved abrasion resistant coating systems such as using sacrificial elements to protect the primary coating integrity after the pipeline pull. PETROBRAS plans to replace existing thermally insulated pipelines crossing Great Sao Paulo. Therefore, pumping heavy oil at high temperatures created the need to develop improved mainline and field joint coatings to avoid having the same sort of problems they are facing in existing thermally insulated lines. Due to these needs, the field joint coating manufactures have been challenged to provide

  17. Construction of pipelines on marshlands during summer months with the aid of gang assembly platforms

    Energy Technology Data Exchange (ETDEWEB)

    Kovalev, E P; Girshovich, I I

    1979-05-01

    Because the massive size of conventional pipeline-construction equipment limits its use in swampy areas to winter months, the USSR's SKB Gazstroimashina developed a new system to allow year-round construction activity. The equipment consists of five mobile platforms arranged in series along the pipeline to spread out the load for a lower specific ground pressure than exerted by conventional equipment. Platforms perform the successive functions of emplacement of the pipe lengths, end preparation, welding, cleanup, and insulation. So far, two sets of gang-assembly platforms have been built and are being field-tested.

  18. Techniques for Minimizing and Monitoring the Impact of Pipeline Construction on Coastal Streams

    Science.gov (United States)

    Thomas W. Mulroy; John R. Storrer; Vincent J. Semonsen; Michael L. Dungan

    1989-01-01

    This paper describes specific measures recently employed for protection of riparian resources during construction of an oil and gas pipeline that crossed coastal reaches of 23 perennial and intermittent streams between Point Conception and Gaviota in Santa Barbara County, California. Flumes were constructed to maintain stream flow; anchored straw bales and silt fences...

  19. Effects of pipeline construction on chernozemic and solonetzic A and B horizons in Central Alberta

    Energy Technology Data Exchange (ETDEWEB)

    Landsburg, S. (NOVA Corp. of Alberta, Calgary, AB (Canada))

    1989-05-01

    The effects of pipeline construction on agricultural soil quality ratings were evaluated for the A and B horizons of Orthic Dark Brown Chernozem and Dark Brown Solonetz soils at three sites in Central Alberta 1 wk after construction. At each site, samples of the Ap horizon from the spoil side, trench, and work side portions of a pipeline right-of-way were compared to a sample of the Ap horizon from an adjacent area unaffected by pipeline construction. Spoil material below replaced topsoil on the trench was compared to a sample of an undisturbed B horizon. Regardless of soil type or land use, construction had no effect on the Ap horizon on the work side. This was due to optimum weather conditions during construction; low rainfall resulted in lack of soil ruting and minimal soil mixing. For both soil types under cultivation, construction increased soluble salt concentrations in the Ap horizons on the spoil side due to mixing of topsoil and spoil materials. There were few effects on the Ap horizon on the spoil side in pasture land, due to trench only topsoil stripping and easy spoil removal from a well-developed sod layer. Both the Ap and spoil from the trench in the Dark Brown Solonetz had increased salt concentrations, while there were few changes in the Dark Brown Chernozem. Mixing of topsoil and spoil material, and bringing salt-enriched material to the spoil surface are thought to be reponsible for the effects due to construction were reflected in the Ap horizon of the trench and spoil side by changes in pH, electrical conductivity, soluble salts and bulk density. Even with the increases in the soil properties monitored, the results indicated that regardless of soil type or land use, pipeline construction did not significantly affect the agricultural soil quality of the A and B horizons. 12 refs., 3 figs., 2 tabs.

  20. Pipeline technology. Petroleum oil - long-distance pipelines. Pipelinetechnik. Mineraloelfernleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Krass, W; Kittel, A; Uhde, A

    1979-01-01

    All questions and concerns of pipeline technique are dealt with in detail. Some chapters can be applied for petroleum pipelines only or partly, for example the importance of petroleum pipelines, projecting, calculation, and operation. The sections of pipes and formings, laying, rights of way, and corrosion protection, accessories and remote effect technique, however, are of general interest, for example also for gas pipelines. In the chapter on working material, a very good summary of today's pipe working material including the thermomechanically treated steels is given. Besides methods of improving the toughness, the problems of the corrosion caused by strain cracking and the ways of avoiding it are pointed out. The pipe producing methods and, in the end of the chapter, the tests in the factory are explained. The section of laying deals with the laying methods being applied for years in pipeline construction, a big part referring to welding methods and tests. Active and passive corrosion protection are explained with all details. In addition to the solidity calculation presented with special regard to concerns of petroleum pipelines, theoretical fundaments and calculation methods for pressure are dealt with. Beside general questions of pumps, accessories, and drives, there is a section dealing with measurement and control techniques. Furthermore, remote effect and transmission techniques and news systems are explained in detail. Here, problems are referred to which are applicable not only to the operation of mineral oil pipelines. The book is completed by indications as to pipeline operation emphasizing general operation control, maintenance, repair methods and damage and their elimination. The last chapter contains a collection of the legal fundaments and the technical rules.

  1. Legal and regulatory possibility of connection between interstate natural gas distribution networks instead of constructing transport pipelines; Possibilidade juridoco-regulatoria da conexao interestadual entre redes de distribuicao de gas natural como alternativa a construcao de gasodutos de transporte

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Gustavo Mano [Andrade, Mano - Advogados, Rio de Janeiro, RJ (Brazil)

    2012-07-01

    According to Revista Brasil Energia (2011a), the local natural gas distribution concessionaire in the State of Sao Paulo Gas Brasiliano Distribuidora - GBD, plans to expand its distribution pipeline network in western Sao Paulo up to the border of the State of Minas Gerais, near the region known as Minas Triangle where a connection with the pipeline network of the State of Minas Gerais' natural gas distribution company, Companhia de Gas de Minas Gerais - GASMIG shall be built in order to supply natural gas to an ammonia plant to be built by PETROBRAS in the City of Uberaba. Still according to the publication, the project described above would be an alternative to the construction of a transportation pipeline that, since the enforcement of the Gas Law - Law No. 11.909/09 (Brasil, 2009), should be subject to concession contracts preceded by a complex, and probably delayed, planning and procurement. However, there is a transportation pipeline project, deriving from the Bolivia-Brazil transportation pipeline near the city of Sao Carlos, in Sao Paulo, crossing the Minas Triangle and finishing in the State of Goias. This project is owned by TGBC Company. The existence of two gas pipeline projects with very similar paths to supply virtually the same regions and based on different regulatory frameworks, one consisting of a connection between the distribution networks of different States and another based on the concept of pipeline transportation of gas under the legal and regulatory federal jurisdiction raises the discussion about the possibility of legal and regulatory interstate connections of distribution pipeline networks as an alternative to planning, allocation and construction of a transportation pipelines. This article aims to examine the legal and regulatory foundations of both alternatives and delineate the limits of performance of States and Federal Government on legislation and regulation concerning the movement of natural gas pipeline through the Country

  2. Diagnosing in building main pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Telegin, L.G.; Gorelov, A.S.; Kurepin, B.N.; Orekhov, V.I.; Vasil' yev, G.G.; Yakovlev, Ye. I.

    1984-01-01

    General principles are examined for technical diagnosis in building main pipelines. A technique is presented for diagnosis during construction, as well as diagnosis of the technical state of the pipeline-construction machines and mechanisms. The survey materials could be used to set up construction of main pipelines.

  3. Status of mapping for pre-detailing and projects of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gil, Fabio Vinicius Fontoura; Paoletto, Bonatto Silvia M. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    Considering the ever growing need for widening and supplying of the national energy matrix, ESTEIO Engenharia e Aerolevantamentos SA presents its participation in the Pipeline area, through Cartography activities, pointing out the performance on strips yet to be implanted, with activities as aerial survey, laser surveys, creation of orthophotomap, tracing definition, rivers crossing, geotechnical surveys, cadaster, creation of cadaster maps, strips, basic project drawings, imagery maps, as well as activities for existing strips, such as: aerial survey, laser surveys, strips enlargements, new property surveys, detection of pipelines through PCM technology, planimetric survey of equipment, besides activities for Pipeline Strips Geometry - FEED - pointing out the detailing of the areas which will be used for the dumping of the digging material and definition of accesses to the pipeline strips. We shall also present the technological evolution and consequent product improvements, considering surveys performed with conventional and digital aerial survey cameras, besides laser data. (author)

  4. The trans-Alaska pipeline controversy: Technology, conservation, and the frontier

    International Nuclear Information System (INIS)

    Coates, P.A.

    1991-01-01

    The Trans-Alaska Pipeline was the object of perhaps the most passionately fought conservation battle in the U.S. Although numerous authors documented the pipeline construction during its construction, there is, surprisingly, no previous scholarly treatment of this event written by an historian. Coates is an environmental historian who views the most interesting aspect of the controversy to be open-quote its relationship to earlier engineering projects and technological innovations in Alaska and the debates that accompanied them.close quotes Thus, he describes how the conservationist and environmental ideas arose during numerous earlier major Alaskan projects and controversies, including the Alaska Highway (1938-41), Canol Pipeline (1943-45), exploration of Naval Petroleum Reserve Number Four (Pet 4, 1944-1953), DEWline (1953-57), oil development in the Kenai National Moose Range (1957-58), statehood (1958), the creation of the Arctic Wildlife Refuge (1960), Project Chariot (1958-63), and Rampart Dam (1959-67). The history starts with the acquisition of Alaska in 1867 and finishes about the time of the Valdez oil spill in 1989

  5. Worldwide natural gas pipeline situation. Sekai no tennen gas pipeline jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, T [Osaka Gas Co. Ltd., Osaka (Japan)

    1993-03-01

    Constructing natural gas pipelines in wide areas requires investments of a huge amount. Many countries are building natural gas supply infrastructures under public support as nations' basic policy of promoting use of natural gas. This paper describes the present conditions of building pipelines in Western Europe, the U.S.A., Korea and Taiwan. In Western Europe, transporting companies established in line with the national policy own trunk pipelines and storage facilities, and import and distribute natural gas. The U.S.A. has 2300 small and large pipeline companies bearing transportation business. Pipelines extend about 1.9 million kilometers in total, with trunk pipelines accounting for about 440,000 kilometers. The companies are given eminent domain for the right of way. Korea has a plan to build a pipeline network with a distance of 1600 kilometers in around 2000. Taiwan has completed trunk pipelines extending 330 kilometers in two years. In Japan, the industry is preparing draft plans for wide area pipeline construction. 5 figs., 1 tab.

  6. Recent developments in pipeline welding practice

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Fourteen chapters are included: overview of pipeline welding systems and quality assurance, CRC automatic welding system, H.C. Price Co. automatic welding system, semi-automatic MIG-welding process, partial penetration welding of steel pipes for gas distribution, construction procedures and quality control in offshore pipeline construction, welding in repair and maintenance of gas transmission pipelines, British Gas studies of welding on pressurized gas transmission pipelines, hot tapping pipelines, underwater welding for offshore pipelines and associated equipment, radial friction welding, material composition vs weld properties, review of NDT of pipeline welds, and safety assurance in pipeline construction. A bibliography of approximately 150 references is included, arranged according to subject and year.

  7. Assessment of ecological and human health risks of heavy metal contamination in agriculture soils disturbed by pipeline construction.

    Science.gov (United States)

    Shi, Peng; Xiao, Jun; Wang, Yafeng; Chen, Liding

    2014-02-28

    The construction of large-scale infrastructures such as nature gas/oil pipelines involves extensive disturbance to regional ecosystems. Few studies have documented the soil degradation and heavy metal contamination caused by pipeline construction. In this study, chromium (Cr), cadmium (Cd), copper (Cu), nickel (Ni), lead (Pb) and zinc (Zn) levels were evaluated using Index of Geo-accumulation (Igeo) and Potential Ecological Risk Index (RI) values, and human health risk assessments were used to elucidate the level and spatial variation of heavy metal pollution risks. The results showed that the impact zone of pipeline installation on soil heavy metal contamination was restricted to pipeline right-of-way (RoW), which had higher Igeo of Cd, Cu, Ni and Pb than that of 20 m and 50 m. RI showed a declining tendency in different zones as follows: trench > working zone > piling area > 20 m > 50 m. Pipeline RoW resulted in higher human health risks than that of 20 m and 50 m, and children were more susceptible to non-carcinogenic hazard risk. Cluster analysis showed that Cu, Ni, Pb and Cd had similar sources, drawing attention to the anthropogenic activity. The findings in this study should help better understand the type, degree, scope and sources of heavy metal pollution from pipeline construction to reduce pollutant emissions, and are helpful in providing a scientific basis for future risk management.

  8. Assessment of Ecological and Human Health Risks of Heavy Metal Contamination in Agriculture Soils Disturbed by Pipeline Construction

    Directory of Open Access Journals (Sweden)

    Peng Shi

    2014-02-01

    Full Text Available The construction of large-scale infrastructures such as nature gas/oil pipelines involves extensive disturbance to regional ecosystems. Few studies have documented the soil degradation and heavy metal contamination caused by pipeline construction. In this study, chromium (Cr, cadmium (Cd, copper (Cu, nickel (Ni, lead (Pb and zinc (Zn levels were evaluated using Index of Geo-accumulation (Igeo and Potential Ecological Risk Index (RI values, and human health risk assessments were used to elucidate the level and spatial variation of heavy metal pollution risks. The results showed that the impact zone of pipeline installation on soil heavy metal contamination was restricted to pipeline right-of-way (RoW, which had higher Igeo of Cd, Cu, Ni and Pb than that of 20 m and 50 m. RI showed a declining tendency in different zones as follows: trench > working zone > piling area > 20 m > 50 m. Pipeline RoW resulted in higher human health risks than that of 20 m and 50 m, and children were more susceptible to non-carcinogenic hazard risk. Cluster analysis showed that Cu, Ni, Pb and Cd had similar sources, drawing attention to the anthropogenic activity. The findings in this study should help better understand the type, degree, scope and sources of heavy metal pollution from pipeline construction to reduce pollutant emissions, and are helpful in providing a scientific basis for future risk management.

  9. Opening up Brazil's hydrocarbon sector - the Bolivia-Brazil pipeline

    International Nuclear Information System (INIS)

    Law, P.

    2000-01-01

    The Bolivia-Brazil natural gas pipeline, which transports natural gas more than 3000 km from Bolivia to Brazil, cost US$2.1 billion to construct. Despite the substantial benefits for both Bolivia and Brazil and the involvement of reputable private partners, the perceived risks and complexities of this large project made financing it major challenge. neither of these countries has had a tradition of independent regulation or economic fuel pricing, and the pipeline was the first major gas infrastructure project involving the private sector in Brazil. The presentation explains the historical features of the project and how the project was used to open up Brazilian oil and gas sector to private investment and competition. (author)

  10. Nova Gas`s pipeline to Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia`s peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI`s success was attributed to excellent interpersonal skills, particularly NGI`s ability to build confidence and credibility with its Thai partners.

  11. Development of ecologically safe method for main oil and gas pipeline trenching

    Directory of Open Access Journals (Sweden)

    Akhmedov Asvar Mikdadovich

    2014-05-01

    Full Text Available Constructive, technical and technological reliability of major pipeline ensures ecological safety on different stages of life circle - beginning with project preparation activities up to the end of major pipeline operation. Even in the process of transition into new life circle stage, no matter if the pipeline needs major repairs or reconstruction, such technical and technological solutions should be found, which would preserve ecological stability of nature-anthropogenic system. Development of ecology protection technologies of construction, reconstruction and major repairs of main pipelines is of great importance not only for a region, but ensures ecological safety across the globe. The article presents a new way of trenching the main oil and gas pipeline, preservation and increase of ecological safety during its service. The updated technological plan is given in the paper for overhaul of the main oil and gas pipeline using the new technology of pipeline trenching. The suggested technical solution contributes to environment preservation with the help of deteriorating shells - the shells’ material decomposes into environment-friendly components: carbon dioxide, water and humus. The quantity of polluting agents in the atmosphere decreases with the decrease of construction term and quantity of technical equipment.

  12. Pipeline leakage recognition based on the projection singular value features and support vector machine

    Energy Technology Data Exchange (ETDEWEB)

    Liang, Wei; Zhang, Laibin; Mingda, Wang; Jinqiu, Hu [College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, (China)

    2010-07-01

    The negative wave pressure method is one of the processes used to detect leaks on oil pipelines. The development of new leakage recognition processes is difficult because it is practically impossible to collect leakage pressure samples. The method of leakage feature extraction and the selection of the recognition model are also important in pipeline leakage detection. This study investigated a new feature extraction approach Singular Value Projection (SVP). It projects the singular value to a standard basis. A new pipeline recognition model based on the multi-class Support Vector Machines was also developed. It was found that SVP is a clear and concise recognition feature of the negative pressure wave. Field experiments proved that the model provided a high recognition accuracy rate. This approach to pipeline leakage detection based on the SVP and SVM has a high application value.

  13. Project for environmental recovery of the Taquari stream in the surroundings of OSBRA Pipeline; Projeto de recuperacao ambiental do corrego Taquari no entorno do duto OSBRA

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Carlos A.R.; Maia, Jacob S; Magalhaes, Milton P; Nunes, Roberta V [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Camargo, Renato F [R. Camargo Ambiental, Americana, SP (Brazil); Ruas, Tereza C.B.G. [Secretaria de Agricultura e Abastecimento, Sao Paulo, SP (Brazil). Coordenadoria de Assistencia Tecnica Integral (CATI)

    2008-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO the Project of Environmental Recovery of Taquari Stream (which runs close to Osbra pipeline) to the end of reducing the effect of flooding of the areas adjoining the water body. The discussion encompasses the following themes: pipeline interference with water bodies during construction; relationship with stakeholders; impact of agricultural activities on water bodies; conflicts upon establishment of legal reserves and protection of Permanent Preservation Areas. (author)

  14. Integrity management of Brazil-Bolivia gas pipeline to reduce risks due third party damage

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcellos, Carlos Renato Aragonez de; Monte, Oswaldo [PETROBRAS, Rio de Janeiro, RJ (Brazil); Colen, Eustaquio; Cunha, Roberto de Souza; Oliveira, Hudson Regis de [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Lima, Rogerio de Souza [RSL Consultoria Geoprojetos (Brazil); Schultz Neto, Walter [Milton Braga Assessoria Tecnica (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline has 2.600 kilometers from Rio Grande City in Bolivia to Canoas City, in the south of Brazil. The right-of-way crosses a lot of types of topography and areas subjected to various kinds of anthropological actions, like areas in class locations 3, locals under agricultural activities, forests and minerals explorations, and near constructions of highway and railway, industrial constructions, new pipelines in the same right-of -way, channels, dams, that requires special projects to avoid that the gas pipeline could be subject to strengths that were not consider in the original design. The aim of this paper is to present the jobs developed by TBG during seven years of gas pipeline operations, as public awareness program, procedures to design, construct and inspect specials constructions along and near the right-of -way, control of mineral and forest explorations, monitoring and controlling of excavations on the right-of-way to install new pipelines and optical cables, to reduce risks of gas pipeline damage due third party, as a component of TBG' Managing Integrity Gas Pipeline Program. (author)

  15. Analyzing Drivers of Conflict in Energy Infrastructure Projects: Empirical Case Study of Natural Gas Pipeline Sectors

    Directory of Open Access Journals (Sweden)

    Chan Young Park

    2017-11-01

    Full Text Available Energy infrastructure projects have caused various conflicts between stakeholders, particularly among the residents around construction sites and operators. The conflicts are largely due to the “Not in My Backyard” mentality associated with hazardous projects. In natural gas pipeline (NGP projects, conflicts have been increasing with the increase in a wider range of linear projects, and they have been worsening because of the lack of clear countermeasures. This study proposes an effective conflict management strategy for NGP projects in Korea. To achieve the objectives, 25 conflict drivers were identified and 143 case-based surveys were conducted to determine the causal relationship between the drivers and the level of conflict using structural equation modeling (SEM. The SEM results show that factors such as economic (e.g., decreased value of the land, construction-related (e.g., disturbance due to using the original route and site, and safety-related characteristics (e.g., concerns about explosions and accidents are the most important in understanding the causes of conflicts. Based on the causal relationship, five key strategies were proposed to manage the critical conflicts. This study can serve as a basis for implementing better conflict management plans in the future for a more sustainable project execution.

  16. Regeneration of vegetation on wetland crossings for gas pipeline rights-of-way one year after construction

    International Nuclear Information System (INIS)

    Shem, L.M.; Zimmerman, R.E.; Zellmer, S.D.; Van Dyke, G.D.; Rastorfer, J.R.

    1993-01-01

    Four wetland crossings of gas pipeline rights-of-way (ROWs), located in Florida, Michigan, New Jersey, and New York, were surveyed for generation of vegetation roughly one year after pipeline construction was completed. Conventional trench-and-fill construction techniques were employed for all four sites. Estimated areal coverage of each species by vegetative strata within transect plots was recorded for plots on the ROW and in immediately adjacent wetlands undisturbed by construction activities. Relative success of regeneration was measured by percent exposed soil, species diversity, presence of native and introduced species, and hydric characteristics of the vegetation. Variable site factors included separation and replacement of topsoil, final grading of the soil, application of seed and fertilizer, and human disturbance unrelated to construction. Successful regeneration exhibited greater dependency on the first three factors listed

  17. Italmontaggi builds expertise Conquering monsoons, adverse conditions Bangladesh pipelines

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    Bangladesh natural gas pipeline projects have become a specialty for Italmontaggi Pte Ltd., Singapore-based gas pipeline contractor and engineering organization. The firm's latest project is a 35-mile, 24-in. gas pipeline, branching from the Bakhrabad-Chittagong main gas pipeline to the city gate station at Demra, near the capital city of Dacca. Gas is delivered to the Titas gas distribution system. The 35-mile turnkey project, valued at $25 million, included design, procurement, construction, and commissioning. A small pipeline was in existence from the Titas gas field to Dacca, but increased demand caused acute power shortages in the capital city's industrial areas. The new gas line will alleviate that problem. That project is a followup to Italmontaggi's successful completion of the major 108-mile, 24-in. main gas pipeline between the Bakhrabad gas fields, outside Dhaha, to the country's principal port and industrial center at Chittagong. Italmontaggi also installed 22 miles of ring main for the Chittagong gas distribution system. That included 12 miles of 24-in. and 10 miles of 16- and 20-in. to provide connections to industrial customers. Bangladesh lines difficult. The $45million contract for the Bakhrabad-toChittagong pipeline to Italmlontaggi, an autonomous offshoot of the Italian firm, resulted in a constant battle against hostile ground conditions, difficult access, and rapidly changing weather conditions. October-to- April is the dry season and Mayto-September is the wet season in this region. To keep the project moving, Italmontaggi developed two independent techniques for ground preparation during the wet season, and a pipelaying technique for the dry season. The new gas pipeline provides a major saving to the Bangladesh national economy as industries convert from oil to gas. Predicted savings are for more than $100 million in energy costs.

  18. Construction of Pipelined Strategic Connected Dominating Set for Mobile Ad Hoc Networks

    Directory of Open Access Journals (Sweden)

    Ceronmani Sharmila

    2016-06-01

    Full Text Available Efficient routing between nodes is the most important challenge in a Mobile Ad Hoc Network (MANET. A Connected Dominating Set (CDS acts as a virtual backbone for routing in a MANET. Hence, the construction of CDS based on the need and its application plays a vital role in the applications of MANET. The PipeLined Strategic CDS (PLS-CDS is constructed based on strategy, dynamic diameter and transmission range. The strategy used for selecting the starting node is, any source node in the network, which has its entire destination within a virtual pipelined coverage, instead of the node with maximum connectivity. The other nodes are then selected based on density and velocity. The proposed CDS also utilizes the energy of the nodes in the network in an optimized manner. Simulation results showed that the proposed algorithm is better in terms of size of the CDS and average hop per path length.

  19. Effect of Wave Impeding Barrier Depth on Buried Pipeline

    OpenAIRE

    Göktepe, Fatih; Küyük, H. Serdar; Çelebi, Erkan

    2013-01-01

    Pipelines are one of most important component of lifeline engineering. For instance, the Southern Caucasus- Eastern Turkey energy corridors are formed by several key pipelines carrying crude oil and natural gas from Azerbaijan, via Georgia, to world markets through Mediterranean Sea. Many project accomplished recently and construction of new corridors are still going on. They should be protected from earthquake disaster especially when they pass through high seismicity zones. The wave impedin...

  20. A midas plugin to enable construction of reproducible web-based image processing pipelines.

    Science.gov (United States)

    Grauer, Michael; Reynolds, Patrick; Hoogstoel, Marion; Budin, Francois; Styner, Martin A; Oguz, Ipek

    2013-01-01

    Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based User Interface, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI) of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline.

  1. A Midas Plugin to Enable Construction of Reproducible Web-based Image Processing Pipelines

    Directory of Open Access Journals (Sweden)

    Michael eGrauer

    2013-12-01

    Full Text Available Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based UI, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline.

  2. Construction and assembly of the Urucu-Coari-Manaus gas pipeline; Construcao e montagem do gasoduto Urucu-Coari-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, Antonio E; Sarno, Ruy [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    This paper aims to present the strategies adopted for the development of the construction and assembly of the Urucu-Coari-Manaus Gas Pipeline and its branches, emphasizing the logistics. With 662 km of extension and crossing 7 Amazonian counties, the construction of this pipeline will take in consideration particular aspects of the region (wavy relief, local population, Amazonian forest and diverse water bodies) and its interference in the works, mainly transport of workers and equipment, distribution of supplying points of fuels and foods, and localization of support work sites. Considering the importance of the region watercourses, techniques for its passages were studied, on a case by case basis and the conventional process, directional drilling and special launching for the passage of the Black river have been adopted. Moreover, this paper presents the activities summary of both environmental licensing process and pre communication related to the communities directly affected by the works, aiming at the beginning of the services of construction and assembly, as well as a story brief of the experiences gathered during the construction of the Poliduto and the Urucu-Coari Gas Pipeline, both constructed between the years of 1997 and 1999. (author)

  3. Canadian pipeline contractors in holding pattern

    Energy Technology Data Exchange (ETDEWEB)

    Caron, G [Pe Ben Pipelines Ltd.; Osadchuk, V; Sharp, M; Stabback, J G

    1979-05-21

    A discussion of papers presented at a Pipe Line Contractors Association of Canada convention includes comments by G. Caron (Pe Ben Pipelines Ltd.) on the continued slack in big-inch pipeline construction into 1980 owing mainly to delayed U.S. and Canadian decisions on outstanding Alaska Highway gas pipeline issues and associated gas export bids and on the use of automatic welding for expeditious construction of the northern sections of the Alaska Highway pipeline; by V. Osadchuk (Majestic Wiley Contract. Ltd.) on the liquidation of surplus construction equipment because of these delays; by M. Sharp (Can. North. Pipeline Agency) on the need for close U.S. and Canadian governmental and industrial cooperation to permit an early 1980 start for construction of the prebuild sections of the Alaska pipeline; and by J. G. Stabback (Can. Natl. Energy Board) on the Alaska oil pipeline applications by Foothills Pipe Lines Ltd., Trans Mountain Pipe Line Co. Ltd., and Kitimat Pipe Line Ltd.

  4. Welding challenges constructing the alliance pipeline

    International Nuclear Information System (INIS)

    Gilroy-Scott, A.; Huntly, B.; Gross, B.

    2001-01-01

    The best Non Destructive Testing technique for Gas Metal Arc welding (GMAW) is Automated Ultrasonic Inspection because of its inherent ability to detect the planar flaws traditionally produced by GMAW operating in the short-circuiting mode in a narrow gap pipeline application. There is a tendency for GMAW flaws to be somewhat longer than those created by SMAW by the mechanised nature of the process which completes anywhere from one sixth to one half of the pipe circumference in one event. Consequently the alternative acceptance criteria of API 1104 in the USA and CSA Z662 in Canada were implemented for the ∼120,000 mechanised welds required to complete the project. Automated Ultrasonic inspection provided the ability for both the length and height of weld flaws to be determined. This is a prerequisite if alternative acceptance criteria are to be considered

  5. Pipeline repair in crossing river; Reparo de oleoduto em travessia de rio

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Walter Manoel [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The inspection and repair of buried pipelines in rivers crossings request the perfect study and use of techniques committed with the people's safety, environmental and pipelines integrity. The planning, elaboration and training in the constructive methods, analysis of technical alternatives and the logistics are preponderant factors. This paper describes step by step, since the risks and difficulties to find a pipe defect indicated in the report of intelligent pig, as well as the actions, experiences and techniques (project, pipeline location, excavation, underwater lowering, reinforcement metallic trench, water exhaustion, rock dismount and pipeline repair sleeves) that allowed repair a pipeline in river crossing. (author)

  6. ANALYSIS OF DEPENDENCE BETWEEN CAPITAL EXPENDUTURES OF CONSTRUCTION WORKS AND GAS DISTRIBUTION PIPELINE DIAMETER

    Directory of Open Access Journals (Sweden)

    Tabunshchikov Yuriy Andreevich

    2012-10-01

    The research also contemplates the structure of expenses associated with the piping of gas distribution networks. Mathematical equations have been derived to perform sufficiently accurate calculations of costs of construction of various types and various lengths of gas pipelines.

  7. Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

    Energy Technology Data Exchange (ETDEWEB)

    Pharris, T. C.; Kolpa, R. L.

    2008-01-31

    Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001), available electronically at http://www.gi.alaska.edu/services/library/pipeline.html codes. The Association of Oil Pipe Lines (AOPL) and the American Petroleum Institute (API) jointly provide an overview covering the life cycle of design, construction, operations, maintenance, economic regulation, and deactivation of liquid pipelines (AOPL/API 2007).

  8. Mixing geopolitics and business: How ruling elites in the Caspian states justify their choice of export pipelines

    Directory of Open Access Journals (Sweden)

    Andreas Heinrich

    2015-07-01

    Full Text Available As political elites in the Caspian countries see themselves as actors who determine the fate of their countries and not as mere objects of international power struggles or as managers of pipeline projects, this contribution examines how domestic elites assess different pipeline projects. Based on close to 1,500 TV reports from national TV stations, which are seen as the mouthpiece of the ruling elites, we analyze the arguments surrounding oil and gas pipeline debate and construction in Azerbaijan, Kazakhstan and Turkmenistan.

  9. Energy intensity, life-cycle greenhouse gas emissions, and economic assessment of liquid biofuel pipelines.

    Science.gov (United States)

    Strogen, Bret; Horvath, Arpad; Zilberman, David

    2013-12-01

    Petroleum fuels are predominantly transported domestically by pipelines, whereas biofuels are almost exclusively transported by rail, barge, and truck. As biofuel production increases, new pipelines may become economically attractive. Location-specific variables impacting pipeline viability include construction costs, availability and costs of alternative transportation modes, electricity prices and emissions (if priced), throughput, and subsurface temperature. When transporting alcohol or diesel-like fuels, pipelines have a lower direct energy intensity than rail, barge, and trucks if fluid velocity is under 1 m/s for 4-inch diameter pipelines and 2 m/s for 8-inch or larger pipelines. Across multiple hypothetical state-specific scenarios, profit-maximizing design velocities range from 1.2 to 1.9 m/s. In costs and GHG emissions, optimized pipelines outperform trucks in each state and rail and barge in most states, if projected throughput exceeds four billion liters/year. If emissions are priced, optimum design diameters typically increase to reduce pumping energy demands, increasing the cost-effectiveness of pipeline projects. Copyright © 2013 Elsevier Ltd. All rights reserved.

  10. The developing human connectome project: A minimal processing pipeline for neonatal cortical surface reconstruction.

    Science.gov (United States)

    Makropoulos, Antonios; Robinson, Emma C; Schuh, Andreas; Wright, Robert; Fitzgibbon, Sean; Bozek, Jelena; Counsell, Serena J; Steinweg, Johannes; Vecchiato, Katy; Passerat-Palmbach, Jonathan; Lenz, Gregor; Mortari, Filippo; Tenev, Tencho; Duff, Eugene P; Bastiani, Matteo; Cordero-Grande, Lucilio; Hughes, Emer; Tusor, Nora; Tournier, Jacques-Donald; Hutter, Jana; Price, Anthony N; Teixeira, Rui Pedro A G; Murgasova, Maria; Victor, Suresh; Kelly, Christopher; Rutherford, Mary A; Smith, Stephen M; Edwards, A David; Hajnal, Joseph V; Jenkinson, Mark; Rueckert, Daniel

    2018-06-01

    The Developing Human Connectome Project (dHCP) seeks to create the first 4-dimensional connectome of early life. Understanding this connectome in detail may provide insights into normal as well as abnormal patterns of brain development. Following established best practices adopted by the WU-MINN Human Connectome Project (HCP), and pioneered by FreeSurfer, the project utilises cortical surface-based processing pipelines. In this paper, we propose a fully automated processing pipeline for the structural Magnetic Resonance Imaging (MRI) of the developing neonatal brain. This proposed pipeline consists of a refined framework for cortical and sub-cortical volume segmentation, cortical surface extraction, and cortical surface inflation, which has been specifically designed to address considerable differences between adult and neonatal brains, as imaged using MRI. Using the proposed pipeline our results demonstrate that images collected from 465 subjects ranging from 28 to 45 weeks post-menstrual age (PMA) can be processed fully automatically; generating cortical surface models that are topologically correct, and correspond well with manual evaluations of tissue boundaries in 85% of cases. Results improve on state-of-the-art neonatal tissue segmentation models and significant errors were found in only 2% of cases, where these corresponded to subjects with high motion. Downstream, these surfaces will enhance comparisons of functional and diffusion MRI datasets, supporting the modelling of emerging patterns of brain connectivity. Copyright © 2018 Elsevier Inc. All rights reserved.

  11. Expansion program is a challenging project

    International Nuclear Information System (INIS)

    Walker, G.L.

    1992-01-01

    This paper reports that construction is set to begin on the $1.5 billion PGT-PG and E Pipeline Expansion Project. It will consist of 691 miles of 42-in pipeline and 110 miles of 36-in. pipeline, to be built over 2 years. The project, which will transport additional supplies of natural gas to US West Coast markets, has its US regulatory approval in hand. On Oct. 16, 1991, the Federal Energy Regulatory Commission authorized Pacific Gas Transmission Co. to construct its Pacific Northwest segment of the expansion. Pacific Gas and Electric Co. received approval to build its California segment in late 1990 from the California Public Utilities Commission

  12. Corrosion behavior of API 5L-X80 Pipeline steel for natural gas pipeline

    International Nuclear Information System (INIS)

    Mohd Asyadi Azam Mohd Abid; Imai, Hachiro

    2007-01-01

    Natural energy problem, including the environmental aspects had changes into certain circumstances in recent years and natural gas has been a focus of constant attention from the viewpoint of energy efficiency and pollution free. From that kind of background, pipeline construction for petroleum and natural gas were considerate as energy infrastructure maintenance plan. Based on the clarification of Asian Pipeline Project (1997-2007) centered in Japan, international pipeline is needed as the natural gas is mainly transported from gas field in Russia and Middle East to consumer country such as Japan etc. It used in severe condition such as cold district and sea. In the meantime, pipeline steel is not just received damages by earth crust fluctuation and corrosion, but also suffered from the corrosion caused by anions that were dissolved in sea and groundwater. The diversification of dispersion and consumption structure of natural gas supply acceptance base are seen regarding, that made the needs of the storing are rising and dealt with the quantitative spatial expansion of the demand. By that, corrosion resistance, not only the hardness, tough, weldability, corrosiveness gas environment is extremely required. (author)

  13. Pipeline protection with multi component liquid polyurethane coating systems

    Energy Technology Data Exchange (ETDEWEB)

    Kuprion, Rainer; Hornig, Maja [TIB Chemicals Ag, Mannheim (Germany)

    2009-07-01

    Protective coating systems are one of the major defence mechanisms against corrosion for transmission pipelines, pipes within a refinery or petrochemical processing facilities. More and more pipelines are being constructed for the supply and transmission of gas and oil, each year but, in addition many existing pipelines are approaching an age where inspection reveals the necessity to consider complete refurbishment. However, the number of rehabilitation projects each year is still relatively small. Therefore, in the coming years, a rising need and necessity can be expected, for the owners and operating companies to be faced with the option of either replacing the pipeline or refurbishing of the existing pipeline. If the pipeline is known to have external corrosion, then safe and economic operation should be assured. Rehabilitation should be done before it is too late in order to ensure its future integrity and operational life. Rehabilitation of pipelines has been both the economic solution and, more significantly, the ecological solution and in many of those cases the coatings selected for the external protection has been multi component liquids based on 100% solids polyurethanes. (author)

  14. Capital structure in LNG infrastructures and gas pipelines projects: Empirical evidences and methodological issues

    International Nuclear Information System (INIS)

    Pierru, Axel; Roussanaly, Simon; Sabathier, Jérôme

    2013-01-01

    This paper provides new empirical insights on the capital structure of project-financed LNG infrastructures and gas pipeline projects, by using data relating to projects whose financial close occurred between June 2004 and March 2011. Most results are consistent with the basic view of risk-averse funds suppliers. Especially, the projects located in risky countries and larger projects tend to exhibit lower debt ratios and less-concentrated equity ownerships. In addition, regasification projects appear to have a more diluted equity ownership. Methodological issues raised by the financing of these projects are also examined from a capital-budgeting perspective. In particular, the equity residual method, usually used by industrial practitioners to value these projects, should be adjusted. - Highlights: • This paper provides new empirical insights on the capital structure of project-financed LNG and gas pipeline infrastructures. • Most of our results are consistent with the basic view of risk-averse funds suppliers. • Projects located in risky countries exhibit lower debt ratios and less-concentrated equity ownerships. • Larger projects and regasification projects also have less concentrated equity ownerships. • From a capital-budgeting viewpoint, we examine methodological issues raised by the financing of these projects

  15. Project for Offshore Horizontal Directional Drilling (HDD for Pipeline Crossing in Bukit Tua, Indonesia

    Directory of Open Access Journals (Sweden)

    Yusuf Sofyan

    2016-09-01

    Full Text Available Horizontal Directional Drilling (HDD is commonly associated with well exploration activity, onshore road crossing, nearshore pipeline installation, and offshore pipeline crossing which requires precise alignment of two barges from one to the other. Here, the purpose of this study was to show one of the projects that was successfully performed on December 2013 for the Bukit Tua Project in East Java, Indonesia costing USD 8 Million. From this project experience, there are 6 Best Practices in HDD Offshore Project for Pipeline Crossing Application (first in region which will serve as a guide to future projects in replicating similar success. Out from 6 Best practices, there are two main recipes for success of HDD offshore for offshore crossings which are the drilling fluid also known as mud, and the Gyro Steering Tool (GST. First, mud parameter varies on case by case basis depending on the soil condition at the location where HDD will be performed. Failure to maintain the above parameters may result in catastrophic failure whereby the bore hole may collapse and pipe may get stuck underneath the seabed. Secondly, the beauty of GST is extremely accurate and unaffected by other metal anomalies during drilling process, thus ensuring the curve profile and direction of drilling are as per design throughout the whole process.

  16. 49 CFR 195.210 - Pipeline location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  17. Using Geographic Information System - GIS - for pipeline management: case of Urucu-Coari LPG pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Furquim, Maysa P.O. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    This technical paper seeks to demonstrate the stages run during the GIS - Geographic Information System accomplishment as for the follow-up of a pipeline work. The GLPDUTO (LPG Pipeline) Urucu-Coari work shall be the focus of this paper. The main challenges in the compilation of data generated in the work site will be presented, as well the importance for the definition of which data should be relevant, so that the construction company and PETROBRAS could follow up its evolution. The GIS development has been performed since January 2007 and should be finished by the first semester of 2009. The following stages for GIS definition for the work management will be presented: brief history of the project - project conception, purpose, structure implemented and accomplishment expectations; survey data in loco - raw data obtained directly during the carrying out of the work and generated in the project and implantation stage; treated data - data resulting from raw data, but already treated as for the GIS environment; routines developed - specific tools created for the consolidation of the data to be manipulated on GIS in an optimized and functional way; result presented - GIS in its final conception, developed and input with the routines and data regarding the project. (author)

  18. Environmental, public health, and safety assessment of fuel pipelines and other freight transportation modes

    International Nuclear Information System (INIS)

    Strogen, Bret; Bell, Kendon; Breunig, Hanna; Zilberman, David

    2016-01-01

    Highlights: • Externalities are examined for pipelines, truck, rail, and barge. • Safety impact factors include incidences of injuries, illnesses, and fatalities. • Environmental impact factors include CO_2eq emissions and air pollution disease burden. • Externalities are estimated for constructing and operating a large domestic pipeline. • A large pipeline has lower cumulative impacts than other modes within ten years. - Abstract: The construction of pipelines along high-throughput fuel corridors can alleviate demand for rail, barge, and truck transportation. Pipelines have a very different externality profile than other freight transportation modes due to differences in construction, operation, and maintenance requirements; labor, energy, and material input intensity; location and profile of emissions from operations; and frequency and magnitude of environmental and safety incidents. Therefore, public policy makers have a strong justification to influence the economic viability of pipelines. We use data from prior literature and U.S. government statistics to estimate environmental, public health, and safety characterization factors for pipelines and other modes. In 2008, two pipeline companies proposed the construction of an ethanol pipeline from the Midwest to Northeast United States. This proposed project informs our case study of a 2735-km $3.5 billion pipeline (2009 USD), for which we evaluate potential long-term societal impacts including life-cycle costs, greenhouse gas emissions, employment, injuries, fatalities, and public health impacts. Although it may take decades to break even economically, and would result in lower cumulative employment, such a pipeline would likely have fewer safety incidents, pollution emissions, and health damages than the alternative multimodal system in less than ten years; these results stand even if comparing future cleaner ground transport modes to a pipeline that utilizes electricity produced from coal

  19. Automated processing pipeline for neonatal diffusion MRI in the developing Human Connectome Project.

    Science.gov (United States)

    Bastiani, Matteo; Andersson, Jesper L R; Cordero-Grande, Lucilio; Murgasova, Maria; Hutter, Jana; Price, Anthony N; Makropoulos, Antonios; Fitzgibbon, Sean P; Hughes, Emer; Rueckert, Daniel; Victor, Suresh; Rutherford, Mary; Edwards, A David; Smith, Stephen M; Tournier, Jacques-Donald; Hajnal, Joseph V; Jbabdi, Saad; Sotiropoulos, Stamatios N

    2018-05-28

    The developing Human Connectome Project is set to create and make available to the scientific community a 4-dimensional map of functional and structural cerebral connectivity from 20 to 44 weeks post-menstrual age, to allow exploration of the genetic and environmental influences on brain development, and the relation between connectivity and neurocognitive function. A large set of multi-modal MRI data from fetuses and newborn infants is currently being acquired, along with genetic, clinical and developmental information. In this overview, we describe the neonatal diffusion MRI (dMRI) image processing pipeline and the structural connectivity aspect of the project. Neonatal dMRI data poses specific challenges, and standard analysis techniques used for adult data are not directly applicable. We have developed a processing pipeline that deals directly with neonatal-specific issues, such as severe motion and motion-related artefacts, small brain sizes, high brain water content and reduced anisotropy. This pipeline allows automated analysis of in-vivo dMRI data, probes tissue microstructure, reconstructs a number of major white matter tracts, and includes an automated quality control framework that identifies processing issues or inconsistencies. We here describe the pipeline and present an exemplar analysis of data from 140 infants imaged at 38-44 weeks post-menstrual age. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  20. Gas pipeline Opon - Barrancabermeja. Consumption at low cost with environmental cleaning

    International Nuclear Information System (INIS)

    Carta Petrolera

    1997-01-01

    The gas pipeline Opon-Barrancabermeja, is part of a project to produce hydrocarbons in the Carare Region. For this line will be transported natural gas of the Opon Field, in Simitarra (Colombia). The benefits that it brings the presence of the gas pipeline for the community have to see from the same construction of the net, joined with diverse programs that link to communities of the influence areas, in aspects related with health, education, environmental reparation and agricultural diversification

  1. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  2. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  3. Inspection of the Sloka Branch pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    By agreement between Latvijas gaze and DONG (the Danish State Gas Company) the Sloka branch on the main gas pipeline Riga-Liepaja was selected for inspection. This pipeline is 30.5 km long and was constructed in 1966/67. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. A further objective has been to provide Latvijas gaze with a package of modern cathodic protection measuring instruments and the necessary know-how for using the instruments. The objectives have been met as follows: Based on a document review together with measurements and observations in the field and in the laboratory, the condition of approximately 10 km of pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline; A cathodic protection instrument package was delivered and a two week training course was arranged in Latvia for Latvijas gaze`s staff covering the use of the instruments. (EG)

  4. On the construction of a new stellar classification template library for the LAMOST spectral analysis pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Wei, Peng; Luo, Ali; Li, Yinbi; Tu, Liangping; Wang, Fengfei; Zhang, Jiannan; Chen, Xiaoyan; Hou, Wen; Kong, Xiao; Wu, Yue; Zuo, Fang; Yi, Zhenping; Zhao, Yongheng; Chen, Jianjun; Du, Bing; Guo, Yanxin; Ren, Juanjuan [Key Laboratory of Optical Astronomy, National Astronomical Observatories, Chinese Academy of Sciences, Beijing 100012 (China); Pan, Jingchang; Jiang, Bin; Liu, Jie, E-mail: lal@nao.cas.cn, E-mail: weipeng@nao.cas.cn [School of Mechanical, Electrical, and Information Engineering, Shandong University, Weihai 264209 (China); and others

    2014-05-01

    The LAMOST spectral analysis pipeline, called the 1D pipeline, aims to classify and measure the spectra observed in the LAMOST survey. Through this pipeline, the observed stellar spectra are classified into different subclasses by matching with template spectra. Consequently, the performance of the stellar classification greatly depends on the quality of the template spectra. In this paper, we construct a new LAMOST stellar spectral classification template library, which is supposed to improve the precision and credibility of the present LAMOST stellar classification. About one million spectra are selected from LAMOST Data Release One to construct the new stellar templates, and they are gathered in 233 groups by two criteria: (1) pseudo g – r colors obtained by convolving the LAMOST spectra with the Sloan Digital Sky Survey ugriz filter response curve, and (2) the stellar subclass given by the LAMOST pipeline. In each group, the template spectra are constructed using three steps. (1) Outliers are excluded using the Local Outlier Probabilities algorithm, and then the principal component analysis method is applied to the remaining spectra of each group. About 5% of the one million spectra are ruled out as outliers. (2) All remaining spectra are reconstructed using the first principal components of each group. (3) The weighted average spectrum is used as the template spectrum in each group. Using the previous 3 steps, we initially obtain 216 stellar template spectra. We visually inspect all template spectra, and 29 spectra are abandoned due to low spectral quality. Furthermore, the MK classification for the remaining 187 template spectra is manually determined by comparing with 3 template libraries. Meanwhile, 10 template spectra whose subclass is difficult to determine are abandoned. Finally, we obtain a new template library containing 183 LAMOST template spectra with 61 different MK classes by combining it with the current library.

  5. Reasons for decision in the matter of Enbridge Southern Lights GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. : facilities

    International Nuclear Information System (INIS)

    2008-01-01

    In March 2007, Enbridge Southern Lights (ESL) GP on behalf of Enbridge Southern Lights LP and Enbridge Pipelines Inc. (EPI) applied for approvals related to the Southern Lights Project. The first component of the project involves the construction of a pipeline to transport diluent from Chicago, Illinois to Edmonton on Line 13, an existing EPI Mainline pipeline. The second component of the project involves a Capacity Replacement Project to replace the loss of southbound capacity on the EPI Mainline system resulting from the transfer of Line 13 to diluent service. The application required Board approvals for several related project components, including the transfer of ownership of EPI's Line 13 to ESL; the removal of Line 13 from southbound crude oil delivery service; reversing the flow on Line 13 to carry diluent from the Canada/US border northbound to Edmonton, Alberta; constructing a new oil pipeline to transport light sour crude oil; physical changes and alterations to EPI's Line 2; and, appropriate tolls and tariffs. The Board determined that the Southern Lights Project is an innovative and cost-effective solution to transport diluent. The applicants demonstrated sufficient diluent shipping commitments to ensure the long term viability of the pipeline. The Board found that the proposal to build new facilities on existing EPI sites and right-of-way should minimize negative impacts on area landowners, and also judged that mitigation planned for the construction phase will minimize potential adverse effects. The Board will require ESL to conduct an emergency response exercise where Line 13 crosses the South Saskatchewan River. Ongoing discussions between the applicants and Aboriginal groups, and a Heritage Resource Discovery Contingency Plan, will reduce potential impacts to traditional use sites. Having reviewed all evidence, the Board approved applications for the Southern Lights Pipeline Project, worth an estimated $247.5 million in Canadian spending. 2 tabs

  6. The Chad-Cameroon petroleum project: loaded dices on the pipeline; Projet petrolier Tchad-Cameroun: des pipes sur le pipe-line

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The project of a oil pipeline starting from Chad and passing threw Cameroon has raised several controversies. History has shown several times in the past that oil discovery in Africa is very often synonymous of the increase of corruption and dictatorship. Talking into account the political situation of both countries, this book explains how this project can be a source of anxiety, in particular concerning the populations' rights and the environment protection. (J.S.)

  7. The Chad-Cameroon petroleum project: loaded dices on the pipeline; Projet petrolier Tchad-Cameroun: des pipes sur le pipe-line

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The project of a oil pipeline starting from Chad and passing threw Cameroon has raised several controversies. History has shown several times in the past that oil discovery in Africa is very often synonymous of the increase of corruption and dictatorship. Talking into account the political situation of both countries, this book explains how this project can be a source of anxiety, in particular concerning the populations' rights and the environment protection. (J.S.)

  8. U.S. interstate pipelines ran more efficiently in 1994

    International Nuclear Information System (INIS)

    True, W.R.

    1995-01-01

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies

  9. The cost of pipelining climate change mitigation: An overview of the economics of CH4, CO2 and H2 transportation

    International Nuclear Information System (INIS)

    Zwaan, B.C.C. van der; Schoots, K.; Rivera-Tinoco, R.; Verbong, G.P.J.

    2011-01-01

    Highlights: → Learning for pipeline construction, if available, is outshadowed by cost variability. → Pipelining is a mature technology, for which much experience has been gained. → Pipeline projects are heterogeneous with widely varying technical and cost specifics. → Pipeline cost components tend to reflect (commodity) market price developments. → Pipeline costs are strongly determined by the properties of the transported gas. -- Abstract: Gases like CH 4 , CO 2 and H 2 may play a key role in establishing a sustainable energy system: CH 4 is the least carbon-intensive fossil energy resource; CO 2 capture and storage can significantly reduce the climate footprint of especially fossil-based electricity generation; and the use of H 2 as energy carrier could enable carbon-free automotive transportation. Yet the construction of large pipeline infrastructures usually constitutes a major and time-consuming undertaking, because of safety and environmental issues, legal and (geo)political siting arguments, technically un-trivial installation processes, and/or high investment cost requirements. In this article we focus on the latter and present an overview of both the total costs and cost components of the distribution of these three gases via pipelines. Possible intricacies and external factors that strongly influence these costs, like the choice of location and terrain, are also included in our analysis. Our distribution cost breakdown estimates are based on transportation data for CH 4 , which we adjust for CO 2 and H 2 in order to account for the specific additional characteristics of these two gases. The overall trend is that pipeline construction is no longer subject to significant cost reductions. For the purpose of designing energy and climate policy we therefore know in principle with reasonable certainty what the minimum distribution cost components of future energy systems are that rely on pipelining these gases. We describe the reasons why we observe

  10. LNG transport through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pfund, P; Philipps, A

    1975-01-01

    LNG pipelines could help solve some peakshaving problems if operated in conjunction with other facilities that could use the LNG cold recovered during regasification. In some areas at present, LNG is delivered by tanker and regasified near the terminal for transmission through conventional gas pipelines. In other places, utilities liquefy natural gas for easy storage for later peakshaving use. The only chance to avoid the second expensive liquefaction step would be to convey imported LNG through a suitable designed LNG pipeline. The technical problems involved in LNG pipeline construction have basically been solved in recent years, but those pipelines actually constructed have been only short ones. To be economically justified, long-distance LNG lines require additional credit, which could be obtained by selling the LNG cold recovered during regasification to industrial users located in or near the points of gas consumption. Technical details presented cover the pipe material, stress relief, steel composition, pressure enthalpy, bellows-type expansion joints, and mechanical and thermal insulation.

  11. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  12. Engineering critical assessment of PETROBRAS Camarupim pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, J.R. [Microalloying International, Houston, TX (United States); Gatlin, R.W. [Global Industries, Rio de Janeiro, RJ (Brazil); Zumpano Junior, P.; Kaspary, T. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    This paper presents details of an Engineering Critical Assessment (ECA) performed to develop girth weld flaw acceptance criteria for the PETROBRAS Camarupim Pipeline which was installed in Espirito Santo Basin, ES, offshore Brazil in May 2008 by Global Industries. The pipeline was constructed using 24-inch diameter API Grade X65 pipe with wall thicknesses of 0.875-inch (22.2 mm) and 1.00 inch (25.4 mm). Although the Camarupim pipeline will initially transport sweet gas there is the potential for mildly sour service operation in mid to late life. To assess the effect of sour service on the material toughness properties a series of slow strain rate fracture toughness tests were performed in a Project representative sour service environment. In addition the results of sour service fatigue crack growth tests were analyzed to develop a conservative sour service fatigue crack growth law for the ECA analysis. (author)

  13. Management of health in the construction and assembly of land pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Richa, Newton M.M.; Ruella, Nildemar C [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The objectives of this study are: describe the main aspects of a health management experience in a work of construction and assembly of land pipeline, highlighting the positive impacts on safety and productivity; demonstrate that the general objective of the health function is to provide technical support to companies, information and services for leaders, managers, supervisors, workers and families in the management of multiple interfaces of health, especially the health-work interface; and demonstrate that the appropriate management of health may contribute significantly to the overall management of undertakings. (author)

  14. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  15. PE-3 - a high class pipeline; PE-3 - um oleoduto high-class

    Energy Technology Data Exchange (ETDEWEB)

    Hashiguchi, D Issao; Santos, J.A. Costa; Medeiros, A Roberto [GDK Engenharia, Salvador, BA (Brazil); Garcia, Amaury [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Santos, F Cesar [Superpesa Transportes Especiais e Intermodais, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Pipeline PE-3, with a length of approximately 17 Km mainly inside of Guanabara Bay, connects the refinery of Duque de Caxias to the terminal of the Ilha D'Agua. It is used to export dark products from the refinery. Product transfer, by operational necessity, is conducted at a temperature of 75 deg C. This introduces a considerable load of tension on the pipeline, in addition to creating a fatigue-inducing thermal cycle. Because of this, and unlike almost all other existing oil and gas pipelines, PE-3 posses a zig zag configuration, alternating a straight tube with a curve of 10 degrees. This stands out as an innovative concept. Their are only two other similar installations in the world, but in very different conditions, thus conferring a pioneering aspect on this pipeline. Due to its criticality, the pipeline is predicated on complete certification in its entirety, from design to operation and in adherence with the strictest requirements. The environmental conditions encountered along its right of way, and the constructive tolerances imposed by the project, obligate the adoption of constructive and technical solutions that are themselves innovative in the terrestrial and marine realms. The principal objective of this work is to present a general overview of the methodology employed in PE-3 construction, installation and assembly. (author)

  16. PE-3 - a high class pipeline; PE-3 - um oleoduto high-class

    Energy Technology Data Exchange (ETDEWEB)

    Hashiguchi, D. Issao; Santos, J.A. Costa; Medeiros, A. Roberto [GDK Engenharia, Salvador, BA (Brazil); Garcia, Amaury [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Santos, F. Cesar [Superpesa Transportes Especiais e Intermodais, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Pipeline PE-3, with a length of approximately 17 Km mainly inside of Guanabara Bay, connects the refinery of Duque de Caxias to the terminal of the Ilha D'Agua. It is used to export dark products from the refinery. Product transfer, by operational necessity, is conducted at a temperature of 75 deg C. This introduces a considerable load of tension on the pipeline, in addition to creating a fatigue-inducing thermal cycle. Because of this, and unlike almost all other existing oil and gas pipelines, PE-3 posses a zig zag configuration, alternating a straight tube with a curve of 10 degrees. This stands out as an innovative concept. Their are only two other similar installations in the world, but in very different conditions, thus conferring a pioneering aspect on this pipeline. Due to its criticality, the pipeline is predicated on complete certification in its entirety, from design to operation and in adherence with the strictest requirements. The environmental conditions encountered along its right of way, and the constructive tolerances imposed by the project, obligate the adoption of constructive and technical solutions that are themselves innovative in the terrestrial and marine realms. The principal objective of this work is to present a general overview of the methodology employed in PE-3 construction, installation and assembly. (author)

  17. External coatings for buried pipelines - a project approach; Revestimento externo para dutos enterrados - uma abordagem de projeto

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, Laerce de P.; Gomes, Luiz Paulo; Nunes, Alessandra de M. [IEC - Instalacoes e Engenharia de Corrosao Ltda., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The transport of liquid or gas fluids, such as water, fuel, chemical products, minerals, among others, through underground pipelines, is becoming more significant in the whole world, specially in Brazil, due to low cost, operational security and low physical interference at the surface. By the other hand, the ambient matters, the population's security in pipeline tracing and economic aspects lead to greater requirements in relation to the integrity of those installations. Corrosion is one of the most important causes of underground pipelines' deterioration and coating and cathodic protection are recommended to prevent it from occurring. However, both techniques must be considered in the pipeline project for it to be successful. At the present work the most important kinds of coating for underground pipelines are presented, as well as the applications, limitations, reference norms and the interface with the cathodic protection systems in relation to the efficiencies to be adopted and the expected performance. Is it also discussed the welded piping joints confection and the protection difficulties when the efficiencies are not corresponded to those foreseen in the cathodic protection systems project. (author)

  18. Northern pipelines : challenges and needs

    Energy Technology Data Exchange (ETDEWEB)

    Dean, D.; Brownie, D. [ProLog Canada Inc., Calgary, AB (Canada); Fafara, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2007-07-01

    Working Group 10 presented experiences acquired from the operation of pipeline systems in a northern environment. There are currently 3 pipelines operating north of 60, notably the Shiha gas pipeline near Fort Liard, the Ikhil gas pipeline in Inuvik and the Norman Wells oil pipeline. Each has its unique commissioning, operating and maintenance challenges, as well as specific training and logistical support requirements for the use of in-line inspection tools and other forms of integrity assessment. The effectiveness of cathodic protection systems in a permafrost northern environment was also discussed. It was noted that the delay of the Mackenzie Gas Pipeline Project by two to three years due to joint regulatory review may lead to resource constraints for the project as well as competition for already scarce human resources. The issue of a potential timing conflict with the Alaskan Pipeline Project was also addressed as well as land use issues for routing of supply roads. Integrity monitoring and assessment issues were outlined with reference to pipe soil interaction monitoring in discontinuous permafrost; south facing denuded slope stability; base lining projects; and reclamation issues. It was noted that automatic welding and inspection will increase productivity, while reducing the need for manual labour. In response to anticipated training needs, companies are planning to involve and train Aboriginal labour and will provide camp living conditions that will attract labour. tabs., figs.

  19. The blind faith deep water horizontal pipeline tie-in project

    Energy Technology Data Exchange (ETDEWEB)

    Charalambides, John Nicos [Oceaneering International, Inc., Houston, TX (United States)

    2009-12-19

    This presentation will concentrate on the design challenges, experience and learning from the SIT and offshore installation of two deepwater pipeline tie-ins using first-of-its-kind subsea technology and installation methodologies on the 'Blind Faith' project. The Blind Faith Subsea Tie-Ins join the Blind Faith oil and gas pipelines with the Canyon Chief gas pipeline and the Mountaineer oil pipeline in 5100 feet of water. Both of the Blind Faith oil and gas pipelines are terminated with conventional PLEMs providing a horizontal connector for the tie-in and a vertical connector for a future tie-in connection point. The connectors are ROV operable/installable clamp style connectors. The method of joining to the Canyon Chief oil and gas pipelines and the type of jumper employed are unique to the tie-in. An ROV operable / installable mechanical pipe end connector connects the bare ends of the Canyon Chief and Mountaineer pipelines. The mechanical pipe end connector is fitted with an integral clamp connector hub and rests on an ROV installed mud mat. After installation of the mechanical connector, metrology was performed to create a neutral state horizontal jumper for joining the mechanical connector hub and the Blind Faith PLEM. The neutral state horizontal jumper is a compliant 'Z-Bend' design. During installation the jumper was elastically pre-deformed using a bowstring system. Pre-deformation of the jumper provided installation clearances and facilitated the neutral stress state after installation. Once landed the jumper bowstring was relaxed, allowing the jumper to expand to fit between the hubs. After expansion and make-up, the clamp connectors were tightened via an ROV operated hydraulic torque wrench. A seal test verified the integrity of the connections. After installation the jumper remains in a minimal residual stress state atypical of most horizontal jumpers. The horizontal jumper was chosen over the vertical jumper because it provides a

  20. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  1. NATURAL GAS SUPPLY PROJECTS FOR EUROPE – SOUTH STREAM AND NABUCCO

    Directory of Open Access Journals (Sweden)

    Domagoj Sučić

    2011-12-01

    Full Text Available South Stream and Nabucco are planned southern corridor projects for natural gas supply to Europe. South Stream is a Russian construction project of the gas pipeline with the capacity of 63 bcm of natural gas per year. It will connect Russia with Austria through Black Sea, Bulgaria, Serbia and Hungary, and with southern Italy through Greece and Ionian Sea, respectively. Nabucco is a European Union planned gas pipeline with the capacity of 31 bcm per year. If built, it will connect Caspian Region and Middle East with Austria through Turkey, Bulgaria, Romania and Hungary. Gas sources for South Stream pipeline are known and available, however it’s construction will be expensive. Nabucco gas pipeline construction costs will be two times less, but the unresolved political relations and non-existent infrastructure have caused it to have no available gas sources at the moment. Countries like Bulgaria and Hungary are involved with both projects, indicating the importance of both projects. In this paper SWOT analysis of the proposed projects was done and it has shown that there is a great chance Nabucco won’t be built if South Stream materializes first (the paper is published in Croatian.

  2. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    Science.gov (United States)

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  3. Rehabilitation of Sao Sebastiao-Cubatao oil pipeline: integrated planning and action - key for project success

    Energy Technology Data Exchange (ETDEWEB)

    Serodio, Conrado J.M. [GDK S.A., Salvador, BA (Brazil)

    2009-12-19

    The execution of the OSBAT 24{sup o}il pipeline rehabilitation project, comprising the substitution of a 30 km section of the 37 years old pipeline has become a real benchmark in the history of this kind of job. The pipeline is inserted in one of the most sensitive environmental areas of the Sao Paulo State - the last Environmental Protection Area of the Mata Atlantica . The growth of human presence in its surroundings during the last three decades, has caused the right-of-way to be totally confined by luxury housing developments, streets, highways and resorts, as well as by the local communities and their activities, schools, and commerce. The pipeline runs through the Serra do Mar unstable mountain range slopes, with sequences of very steep hills and ravines followed by swamps and rivers. The success of such a challenging project - assembling the new line in a narrow ROW with all its restrictions, where the old line was still in operation, and complying with the tight work schedule required by PETROBRAS, was only possible due to a carefully managed combination of: accurate planning, best engineering methods and equipment and experienced workforce, deeply integrated in a massive effort towards safety, environmental care and social responsibility. (author)

  4. Innovation tube transport using helicopters to minimize the construction risk of Urucu-Manaus pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Barreto, Jean Luis C. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Mendes, Jeane R.; Rodrigues, Jose Alberto S.; Rocha, Katia Rosilene S. [CONCREMAT Engenharia e Tecnologia Ltda., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Our purpose is to focus on the Safety, Environment and Health (SEH) Management, integrated to pipeline construction and assembly, aiming at minimizing the risks involving the transportation and handling of 20-inch pipes. Please note that peculiar, challenging situations occur when constructing a gas pipeline at the Coari-Anama Section, which leads to some difficulty in the exploitation of oil and gas, where fragile elements represented by the environment and man are faced in this evolution and progress process. Overcoming the severe conditions while streaming 196.6-km-length of pipes in flooded lands no doubt represented a real challenge. State-of-the-art techniques have been implemented such as air transportation of pipes, with two large-sized helicopters being used (Kamov and S64 Skycrane). This has demanded integrated actions to be adopted, involving transportation of concrete pipes, double joints, pipesak, hydraulic excavators, net carrier containing assorted materials, skids and natural gas pressure, measurement and filtering equipment. Nevertheless, we have succeeded in reducing the rate of exposure to the construction and assembly process risks, thus minimizing occurrences and improving the conditions of processes, where, had the conventional method been used, would have led to a great amount of incidents and accidents, resulting mainly from the huge logistic difficulties, which would expose the task force to high potential risks. (author)

  5. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  6. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  7. The influence of the internal microbiome on the materials used for construction of the transmission natural gas pipelines in the Lodz Province

    OpenAIRE

    Staniszewska Agnieszka; Jastrzębska Magdalena; Ziemiński Krzysztof

    2017-01-01

    This paper presents investigation results of the influence of gas microbes on the biocorrosion rate of the materials used for gas pipelines construction in the Lodz Province. Samples of two types of carbon steel and cast iron were stored in the laboratory pipeline model reflecting the real conditions of working natural gas pipelines were. In the next step the influence of cathodic protection with parameters recommended for protection of underground structures was tested. Analyses of biologica...

  8. Northern entanglement : Arctic gas pipeline plans caught in web of competing interests, but dire supply-demand forecasts indicate line will be built

    International Nuclear Information System (INIS)

    Stonehouse, D.

    2005-01-01

    This article discussed land access and regulatory issues surrounding decisions to stop field work of the Mackenzie Valley pipeline in the spring of 2005. Although current supply and demand balances in natural gas markets argue that the pipeline will be beneficial, Imperial Oil and its partners have halted activities such as geotechnical data-gathering programs and preparatory work on contracting construction. The project's future depends on the successful resolution of First Nations land claims, governmental disputes and various activist groups protesting the pipeline's construction. Imperial Oil has suggested that the pipeline presents a significant opportunity for the people of the North to reduce their reliance on government and will create jobs and business opportunities for Aboriginal people. In the aftermath of work stoppage, Alberta's former Energy Minister stated that imports of Liquefied Natural Gas (LNG) and Alaska gas from the proposed Alaska Highway Pipeline Project may arrive on the market in advance of the Mackenzie Valley project, which would affect the project's financial future. It was noted that access and benefits agreements with First Nations stakeholders have yet to be reached. Lawsuits involving the Deh Cho First Nations were examined. It was also suggested that Imperial Oil has not included information on the Alberta portion of the project in its environmental impact assessment. It was concluded that if the Mackenzie Delta line isn't in service by 2010, North American consumers can expect to spend an extra $190 billion on gas from 2011 to 2020. 3 figs

  9. Pipeline robots with elastic elements

    Directory of Open Access Journals (Sweden)

    A. Matuliauskas

    2002-10-01

    Full Text Available In the article constructions of the pipeline robots with elastic elements are reviewed and the scheme of new original construction is presented. The mathematical models of a robot with one-dimensional vibration exciter with two degrees of freedom were developed and the equations of movement were formed and written. The mathematical model of the pipeline robot with circular elements is formed and its motion equations are presented.

  10. Mackenzie Valley Pipeline market demand, supply, and infrastructure analysis : final report

    International Nuclear Information System (INIS)

    2004-01-01

    Mackenzie Valley Pipeline Co-Venturers is a consortium of petroleum companies proposing to construct a 1,400 km long, large-diameter, high-pressure natural gas transmission pipeline from the northwestern edge of the Northwest Territories to the Alberta-Northwest Territories border. The Mackenzie Valley Pipeline will bring natural gas from the Mackenzie Delta region to markets in Alberta, central and eastern Canada and the United States. Navigant Consulting Ltd. prepared this assessment of the long-term market need for natural gas produced from the Mackenzie Delta. It presents an analysis of gas demand, supply and infrastructure. Three sensitivity cases were examined, incorporating different assumptions about the initial capacity of the pipeline, potential expansion of its capacity and different levels of gas demand in Canada and the United States. The report indicates that gas markets in North America support construction of the proposed 34 million cubic metre per day pipeline in the 2009 timeframe, with possible expansion in 2015 and 2020. It also indicates that there will be enough capacity on the intra-Alberta gas transmission system to accommodate the projected deliveries of Mackenzie Delta gas. The increase in gas demand is due to an increase in residential and commercial gas consumption, electric power generation and the energy intensive bitumen extraction and processing activities in the Alberta oil sands industry. 36 tabs., 56 figs

  11. Market Brief : Turkey oil and gas pipelines

    International Nuclear Information System (INIS)

    2001-08-01

    This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and supervisory control and data acquisition (SCADA) systems. Currently, the major players are suppliers from Italy, Germany, France, United States and Japan. Turkey has no trade barriers and imported equipment and materials are not subjected to any restriction. The oil and gas market in Turkey expected in increase by an average annual growth rate of 15 per cent from 2001 to 2003. A brief description of pipeline projects in Turkey was presented in this report along with a list of key contacts and support services. 25 refs., 1 append

  12. Trouble in the pipeline?

    Energy Technology Data Exchange (ETDEWEB)

    Snieckus, Darius

    2002-10-01

    The author provides a commentary on the political, economic, environmental and social problems facing the proposed 3 billion US dollars Baku-Ceyhan-Tbilisi export pipeline. The 1760 km long pipeline has been designed to carry 1 million b/d of crude oil from the Caspian Sea to Turkey's Mediterranean coast. The pipeline is being constructed by a BP-led consortium made up of Socar, Statoil, Unocal, TPAO, Eni, Itochu, Amerada Hess, TotalFinaElf and BP. (UK)

  13. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1998-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  14. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  15. 76 FR 73618 - Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the...

    Science.gov (United States)

    2011-11-29

    ... assesses the potential environmental effects of the construction and operation of the Project in accordance...; and Sussex County, New Jersey; Abandonment of an existing meter station and construction of a new... that can be used to clean and dry a pipeline and/or to inspect it for damage or corrosion. Use of...

  16. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  17. Comprehensive long distance and real-time pipeline monitoring system based on fiber optic sensing

    Energy Technology Data Exchange (ETDEWEB)

    Nikles, Marc; Ravet, Fabien; Briffod, Fabien [Omnisens S.A., Morges (Switzerland)

    2009-07-01

    An increasing number of pipelines are constructed in remote regions affected by harsh environmental conditions. These pipeline routes often cross mountain areas which are characterized by unstable grounds and where soil texture changes between winter and summer increase the probability of hazards. Due to the long distances to be monitored and the linear nature of pipelines, distributed fiber optic sensing techniques offer significant advantages and the capability to detect and localize pipeline disturbance with great precision. Furthermore pipeline owner/operators lay fiber optic cable parallel to transmission pipelines for telecommunication purposes and at minimum additional cost monitoring capabilities can be added to the communication system. The Brillouin-based Omnisens DITEST monitoring system has been used in several long distance pipeline projects. The technique is capable of measuring strain and temperature over 100's kilometers with meter spatial resolution. Dedicated fiber optic cables have been developed for continuous strain and temperature monitoring and their deployment along the pipeline has enabled permanent and continuous pipeline ground movement, intrusion and leak detection. This paper presents a description of the fiber optic Brillouin-based DITEST sensing technique, its measurement performance and limits, while addressing future perspectives for pipeline monitoring. (author)

  18. Beyond the pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Barnsley, J.; Ellis, D.; McIntosh, J.

    1979-12-01

    A study was conducted on the lives of women and their families in Fort Nelson, British Columbia, and Whitehorse, Yukon Territory, two communities which are to be affected by the proposed construction of the Alaska Highway gas pipeline. The womens' socio-economic concerns resulting from the proposed construction were examined by means of interviews with samples of women living in the two communities. Results from the study include descriptions of the communities and their basic services, community planning and housing, women's work in the home and for wages, and the perceived impact of the pipeline on such matters as employment, social services, living costs, business, housing, crime, and the overall community. Recommendations are made to improve the planning process for the pipeline to include the taking into account of womens' needs in such areas as training, health care, housing, and community services. 213 refs., 4 figs., 2 tabs.

  19. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.

  20. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  1. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS: Executive summary

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level

  2. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  3. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  4. 77 FR 31347 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Science.gov (United States)

    2012-05-25

    ... environmental assessment (EA) for the MPP Project, proposed by Tennessee Gas Pipeline Company, L.L.C. (TGP) in the above-referenced docket. TGP requests authorization to construct and operate 7.9 miles of looped... connection with its evaluation of TGP's Clean Water Act (Section 404) permit application for the MPP Project...

  5. Proceedings of the 5. biennial international pipeline conference, IPC 2004 : the power of technology

    International Nuclear Information System (INIS)

    Paulson, K.; Kraft, H.; Hopkins, P.

    2004-01-01

    The fifth international pipeline conference provided a forum for experts in the pipeline industry, academia and governments to discuss new technologies and approaches to pipeline transport. Presentations focused on a wide range of issues related to pipeline engineering. The conference was divided into 16 main sessions: (1) compression and pump technologies, (2) corrosion protection and analysis techniques, (3) pipeline design and construction, (4) environmental issues, (5) database development, (6) emerging issues and innovative projects, (7) inspection techniques, (8) integrity management, (9) joining, (10) materials, (11) offshore issues, (12) operations and maintenance, (13) pipeline automation and measurement, (14) pipelining in northern environments, (15) risk and reliability, (16) standards and regulations. The presentations provided up-to-date information related to future technology trends as well as recent innovations and practices. Pipeline design standards and new pipeline materials using high strength steels and reinforced composite plastic coatings were also reviewed. Other sessions discussed emerging technologies for inspection, quality control, ultrasonic testing, and the use of remote sensors. The conference also included a student paper competition. A total of 339 peer reviewed presentations were given at the conference, all of which were indexed separately for inclusion in this database. refs., tabs., fig.

  6. Pipelines from the north : a U.S. perspective

    International Nuclear Information System (INIS)

    Slutz, J.

    2003-01-01

    The United States will continue to look to Canada and Alaska for a significant part of its natural gas supply in an effort to meet its growing demand for energy. The United States depends on Canadian gas as a reliable and secure supply of energy, and is therefore examining natural gas markets and the wide range of supply opportunities. This presentation highlighted changes in cross border natural gas trade in North America and noted that 94 per cent of natural gas going to the United States from Canada is shipped via pipeline. On the liquefied natural gas (LNG) front, U.S. exports to Mexico now exceed imports, but import volumes from Trinidad and Nigeria are increasing as expected. Total import volumes in 2001 surpassed the previous year. A look at the infrastructure of LNG in the United States was also presented along with the advantages and limitations of each option. Cost comparisons were also presented. It was noted that any import or LNG project would result in unique economics. LNG projects are now cheaper because of better engineering, economies of scale and better pipeline economics. The U.S. National Energy Policy recommends that the pipeline to bring Alaskan gas to U.S. markets should be constructed as soon as possible. It was emphasized that any project to ship natural gas from Alaska to the lower 48 will need to work closely with Canada in order to be successful. 15 figs

  7. GASDUC-3: a gas pipeline with neutralization of greenhouse gases

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Paula, Eliane H. de; Freire, Dilian A.D. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    PETROBRAS seeks to develop its projects following the contemporary premises of sustainable development. The Cabiunas-REDUC-3 Gas Pipeline (GASDUC-3), an undertaking from the Transportadora Associada de Gas - TAG (Associated Gas Transporter) in progress by PETROBRAS, is an example showing that interfacing with the environment can overcome legal questions to reach the realm of awareness and community spirit. In addition to the many programs directed specifically towards the fulfillment of environmental regulations, as defined by competent agencies, the GASDUC-3 is also inserted in the Carbon Free Program. In the Carbon Free Program, all the GHG emissions into the atmosphere during the construction of the gas pipeline will be compensated for with the neutralization of carbon through reforestation. Such initiative is considered unheard of in works with pipelines worldwide. An inventory that quantified the emission of GHG during the implementation of GASDUC-3 made it possible to quantify the reforestation to be implemented and to calculate the number of native species to be planted for absorption - during the course of their growth - of this same amount of carbon dioxide from the atmosphere. The trees are being planted especially in Permanent Preservation Areas (PPA), located in the Unidades de Conservacao do Bioma Mata Atlantica (Conservation Units of the Atlantic Forest Biome), inside the influence region of the gas pipeline, in accordance with the competent environmental agencies and owners. In this way, in addition to fixing carbon and contributing to the deceleration of global warming, the project also cooperates with the preservation of hydro and soil resources and the local and regional biodiversity. The recapturing of the already emitted GHG through reforestation faces bureaucratic and economic difficulties in order to be implemented, different from the emission reduction projects which are widely disseminated by means of Clean Development Mechanisms (CDM

  8. An integrated approach to route selection in slurry pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy G.; Altmann, Nara [Brass Chile S.A., Santiago (Chile)

    2009-12-19

    The pressure to get engineering projects done and constructed as fast as possible in order to take advantage of the high prices in metals and petrochemicals has been driving companies to skip the conceptual phase and go straight into basic engineering with cost estimates in the level of 15% accuracy. By-passing early engineering and demanding higher cost estimating accuracy is a contradiction. In most cases, savings made on capital investment is much higher had money been spent in conceptual studies which allow for the optimal solution to be found. This paper reviews one of the key aspects in conceptual engineering of slurry pipeline designs: route selection. This activity is often overlooked, causing capital cost and operating difficulties to rise unnecessarily. This paper describes and gives example on how an integrated client/engineering company's approach to route selection can produce significant savings in pipeline construction and operating costs. (author)

  9. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  10. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  11. Leakage Risk Assessment of CO{sub 2} Transportation by Pipeline at the Illinois Basin Decatur Project, Decatur, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    Mazzoldi, A.; Oldenburg, C. M.

    2013-12-17

    The Illinois Basin Decatur Project (IBDP) is designed to confirm the ability of the Mt. Simon Sandstone, a major regional saline-water-bearing formation in the Illinois Basin, to store 1 million tons of carbon dioxide (CO{sub 2}) injected over a period of three years. The CO{sub 2} will be provided by Archer Daniels Midland (ADM) from its Decatur, Illinois, ethanol plant. In order to transport CO{sub 2} from the capture facility to the injection well (also located within the ADM plant boundaries), a high-pressure pipeline of length 3,200 ft (975 m) has been constructed, running above the ground surface within the ADM plant footprint. We have qualitatively evaluated risks associated with possible pipeline failure scenarios that lead to discharge of CO{sub 2} within the real-world environment of the ADM plant in which there are often workers and visitors in the vicinity of the pipeline. There are several aspects of CO{sub 2} that make its transportation and potential leakage somewhat different from other substances, most notable is its non-flammability and propensity to change to solid (dry ice) upon strong decompression. In this study, we present numerical simulations using Computational Fluid Dynamics (CFD) methods of the release and dispersion of CO{sub 2} from individual hypothetical pipeline failures (i.e., leaks). Failure frequency of the various components of a pipeline transportation system over time are taken from prior work on general pipeline safety and leakage modeling and suggest a 4.65% chance of some kind of pipeline failure over the three-years of operation. Following the Precautionary Principle (see below), we accounted for full-bore leakage scenarios, where the temporal evolution of the mass release rate from the high-pressure pipeline leak locations was simulated using a state-of-the-art Pipe model which considers the thermodynamic effects of decompression in the entire pipeline. Failures have been simulated at four representative locations along

  12. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  13. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  14. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  15. Jockeying for position : how the proposed pipeline projects and route-on-route competition are shaping up in the Arctic

    International Nuclear Information System (INIS)

    Andre, H.

    2003-01-01

    This presentation included a brief historical look at pipeline proposals submitted over the years to bring Alaska and Northwest Territories gas to market. The challenges facing the early proponents of a pipeline from Prudhoe Bay to the Mackenzie Delta, such as cost, environmental impact and socio-economic impact on Aboriginals living in the Mackenzie Valley, have now been removed. Lobbying efforts by politicians in Alaska nearly succeeded in forcing an Alaska Highway gas pipeline, instead of letting market economics dictate the route. The author indicated that an Alaska pipeline would not benefit the Canadian natural gas industry, rather it would force production from the Western Canada Sedimentary Basin (WCSB) to be slashed, resulting in reduced drilling and lower royalties to government. The author suggested that Canada should not grant any permit to construct a pipeline in Canada that is destined for markets in the contiguous United States if the pipeline was in any way subsidized to disadvantage Canadian producers. The author explained why the proposal to build a standalone pipeline in the Mackenzie Valley before the Alaska Highway pipeline is not a good idea. Gas prices and pipeline tolls are the most important economic elements. The author expressed the opinion that the over the top route combined with the Mackenzie Valley route would be beneficial to both Canada and the United States for a host of reasons. figs

  16. A quick guide to pipeline engineering

    CERN Document Server

    Alkazraji, D

    2008-01-01

    Pipeline engineering requires an understanding of a wide range of topics. Operators must take into account numerous pipeline codes and standards, calculation approaches, and reference materials in order to make accurate and informed decisions.A Quick Guide to Pipeline Engineering provides concise, easy-to-use, and accessible information on onshore and offshore pipeline engineering. Topics covered include: design; construction; testing; operation and maintenance; and decommissioning.Basic principles are discussed and clear guidance on regulations is provided, in a way that will

  17. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  18. Pipelines 'R' us

    International Nuclear Information System (INIS)

    Thomas, P.

    1997-01-01

    The geopolitical background to the export of oil and gas from Kazakhstan by pipeline is explored with particular reference to the sensitivities of the USA. There are now a number of pipeline proposals which would enable Kazakhstan to get its hydrocarbons to world markets. The construction of two of these formed part of a major oil deal signed recently with China in the face of stiff competition from major US companies. The most convenient and cost effective route, connecting up with Iran's existing pipeline network to the Gulf, is unlikely to be developed given continuing US sanctions against Iran. Equally unlikely seems to be the Turkmenistan to Pakistan pipeline in the light of the political volatility of Afghanistan. US companies continue to face limits on export capacity via the existing Russian pipelines from Kazakhstan. A temporary solution could be to carry some oil in the existing pipeline from Azerbaijan to Georgia which has been upgraded and is due to become operational soon, and later in a second proposed pipeline on this route. The Caspian Pipeline Consortium, consisting of three countries and eleven international companies, is building a 1500 km pipeline from the Tergiz field to Novorossiysk on the Black Sea with a view to completion in 2000. An undersea pipeline crossing the Caspian from Azerbaijan is being promoted by Turkey. There is an international perception that within the next five years Kazakhstan could be in a position to export its oil via as many as half a dozen different routes. (UK)

  19. Canada. Northern pipeline agency: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Includes overview of the Alaska Highway Gas Pipeline Project with a review of construction activity to date, and gas markets. Discusses developments affecting operations of the pre-build, U.S. and Canadian developments for both the Eastern and Western legs, the Mackenzie Delta Gas Reserves, application of the bilateral agreement on procurement, and operations of the Canadian and US Regulatory Agencies. Also reviews finance, personnel, the Official Languages Plan and the Report of the Auditor General.

  20. Impacts of space weather and space climate on pipeline network operations

    Science.gov (United States)

    Trichtchenko, Larisa

    2014-05-01

    The geomagnetic fluctuations are accompanied by geo-electric (telluric) field and telluric currents at the surface of the Earth and in the pipelines. These currents interfere with pipeline corrosion protection, creating pipe-to-soil potential (PSP) fluctuations. It impacts pipeline operations in two ways. One is that non-disturbed "true" level of the protection is not known, which might lead to the wrong conclusions that a pipeline coating is damaged and digging out the section of the pipeline is needed. The other effect is changes in the electrical conditions in the pipeline-soil interface, compromising the corrosion protection and possibly causing enhancement of the corrosion. The global trend for construction of more pipelines in northern regions means placing them into areas where natural geomagnetic variations are larger and consequently telluric activity is more extreme, in comparison with pipelines located further south. This paper describes the solutions implemented as the result of the two projects done by NRCan researchers led by the author on request from pipeline companies. Two methods were proposed and implemented to address the problems. One is the statistical estimation of the telluric activity in the area of the planned pipelines. These statistical considerations then used as guidance in the design of corrosion protection systems to counteract the excessive corrosion. The other, to deal with the corrupted results during the pipeline surveys, is to forecast the geomagnetic storms for proper planning of the surveys. In addition, the developed telluric activity identification tool can be used in the analysis of the corrupted survey data.

  1. Pipeline operators training and certification using thermohydraulic simulators

    Energy Technology Data Exchange (ETDEWEB)

    Barreto, Claudio V.; Plasencia C, Jose [Pontificia Universidade Catolica (PUC-Rio), Rio de Janeiro, RJ (Brazil). Nucleo de Simulacao Termohidraulica de Dutos (SIMDUT); Montalvao, Filipe; Costa, Luciano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The continuous pipeline operators training and certification of the TRANSPETRO's Pipeline National Operations Control Center (CNCO) is an essential task aiming the efficiency and safety of the oil and derivatives transport operations through the Brazilian pipeline network. For this objective, a hydraulic simulator is considered an excellent tool that allows the creation of different operational scenarios for training the pipeline hydraulic behavior as well as for testing the operator's responses to normal and abnormal real time operational conditions. The hydraulic simulator is developed based on a pipeline simulation software that supplies the hydraulic responses normally acquired from the pipeline remote units in the field. The pipeline simulation software has a communication interface system that sends and receives data to the SCADA supervisory system database. Using the SCADA graphical interface to create and to customize human machine interfaces (HMI) from which the operator/instructor has total control of the pipeline/system and instrumentation by sending commands. Therefore, it is possible to have realistic training outside of the real production systems, while acquiring experience during training hours with the operation of a real pipeline. A pilot Project was initiated at TRANSPETRO - CNCO targeting to evaluate the hydraulic simulators advantages in pipeline operators training and certification programs. The first part of the project was the development of three simulators for different pipelines. The excellent results permitted the project expansion for a total of twenty different pipelines, being implemented in training programs for pipelines presently operated by CNCO as well as for the new ones that are being migrated. The main objective of this paper is to present an overview of the implementation process and the development of a training environment through a pipe simulation environment using commercial software. This paper also presents

  2. What, me worry? Pipeline certification at the FERC

    International Nuclear Information System (INIS)

    Schneider, J.D.

    1997-01-01

    Some of the new major pipeline projects that will bring Canadian gas into Chicago and the United States northeastern market were described. The seven projects discussed were: Independence Pipeline Company, Columbia's Millennium Project, Alliance Pipeline, Viking Voyageur, Pan Energy's Spectrum, Tennessee's Eastern Express, and National Fuel Expansion. The need for all this new capacity was questioned. The US FERC Commissioners are willing to let the market decide the need for this capacity. It was noted that the serious regulatory issues pipelines will face lie in the radically different rate treatment for pipelines, depending on the support the market shows for their respective projects. Various past decisions of the Federal Energy Regulatory Commission (FERC) were reviewed to illustrate the direction of the Commission's thinking in terms of regulatory approval, and to examine the question of whether FERC's approval policy makes good sense. The author's view is that the 'at risk' conditions of approval, coupled with incremental rate treatment by the Commission does, in fact, provide protection for consumers

  3. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  4. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  5. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  6. Recovery of native prairie after pipeline construction in the Sand Hills region of Saskatchewan

    International Nuclear Information System (INIS)

    Walker, D.; Kremer, L.; Marshall, W.

    1996-01-01

    Land reclamation measures taken after construction of a large diameter natural gas pipeline in the Great Sand Hills region of southwestern Saskatchewan were detailed. Mitigation measures included modified construction procedures to minimize the size of the disturbance, worker educational programs to sensitize them to the prevailing fragile environment, dormant season construction, efforts to salvage topsoil seedbank, fertilizer application, straw bale wind barriers, brush mulch wind barriers, surface manipulation with the Hodder Gouger, fencing-out cattle, and the application of a seed mixture of agronomic legumes and native grasses. Vegetation and soil erosion were monitored over a period of four years. After four years the canopy cover was 88 per cent native species. On low-lying, protected sites vegetation was stable enough to support cattle grazing. Exposed sites will not reach this level of vegetation stability for some years to come due soil erosion by wind

  7. Latvijas gaze. Inspection of pipeline. Interim report. Cathodic protection, phase 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The Sloka pipeline branch was constructed in 1966-67. Between 1976 and 1985 a number of leaks were detected. The majority of leaks, from chainage appr. 22 km to appr. 29 km, were reported to be caused by stray current induced corrosion. Latvijas Gaze has expressed specific concern as to whether more corrosion defects, though not yet detected, may cause potential risks for future leaks. It was hence agreed at the project meeting in Riga on October 19, 1995, that Balslev should conduct an intensive potential and gradient survey covering appr. 10 km of pipeline up to the Sloka end. The branch is appr. 30,5 km long, and runs from a T-branch on the main pipeline Riga - Lipeija (chainage 0 km) to Sloka (chainage 30,5 km). The diameter of the pipeline is 273 mm and the thickness of the steel is 8 mm. The pipeline is running parallel to a DC-electrified railway over the last appr. 3 km. The stray current from the railway collected on the pipeline has been returned to the railway via two diode drain points. Today only one drain point is active. Stray current (or even reverse current) may be the reason for the serious corrosion defects, cf. Corrosion Report 1985 from `the Leningrade Institute`. (JT)

  8. Pydpiper: A Flexible Toolkit for Constructing Novel Registration Pipelines

    Directory of Open Access Journals (Sweden)

    Miriam eFriedel

    2014-07-01

    Full Text Available Using neuroimaging technologies to elucidate the relationship between genotype and phenotype and brain and behavior will be a key contribution to biomedical research in the twenty-first century. Among the many methods for analyzing neuroimaging data, image registration deserves particular attention due to its wide range of applications. Finding strategies to register together many images and analyze the differences between them can be a challenge, particularly given that different experimental designs require different registration strategies. Moreover, writing software that can handle different types of image registration pipelines in a flexible, reusable and extensible way can be challenging. In response to this challenge, we have created Pydpiper, a neuroimaging registration toolkit written in Python. Pydpiper is an open-source, freely available pipeline framework that provides multiple modules for various image registration applications. Pydpiper offers five key innovations. Specifically: (1 a robust file handling class that allows access to outputs from all stages of registration at any point in the pipeline; (2 the ability of the framework to eliminate duplicate stages; (3 reusable, easy to subclass modules; (4 a development toolkit written for non-developers; (5 four complete applications that run complex image registration pipelines ``out-of-the-box.'' In this paper, we will discuss both the general Pydpiper framework and the various ways in which component modules can be pieced together to easily create new registration pipelines. This will include a discussion of the core principles motivating code development and a comparison of Pydpiper with other available toolkits. We also provide a comprehensive, line-by-line example to orient users with limited programming knowledge and highlight some of the most useful features of Pydpiper. In addition, we will present the four current applications of the code.

  9. Slurry pipeline technology: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Jay P. [Pipeline Systems Incorporated (PSI), Belo Horizonte, MG (Brazil); Lima, Rafael; Pinto, Daniel; Vidal, Alisson [Ausenco do Brasil Engenharia Ltda., Nova Lima, MG (Brazil). PSI Div.

    2009-12-19

    Slurry pipelines represent an economical and environmentally friendly transportation means for many solid materials. This paper provides an over-view of the technology, its evolution and current Brazilian activity. Mineral resources are increasingly moving farther away from ports, processing plants and end use points, and slurry pipelines are an important mode of solids transport. Application guidelines are discussed. State-of-the-Art technical solutions such as pipeline system simulation, pipe materials, pumps, valves, automation, telecommunications, and construction techniques that have made the technology successful are presented. A discussion of where long distant slurry pipelines fit in a picture that also includes thickened and paste materials pipe lining is included. (author)

  10. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines

    International Nuclear Information System (INIS)

    Jafalian, A.

    2004-01-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  11. Crude oil growth impact on pipelines

    International Nuclear Information System (INIS)

    Devries, O.

    2005-01-01

    This paper provided an outline of crude oil production and supply in Canada. Details of oil sands projects in Athabasca, Cold Lake and Peace River were presented. A chart of oil sands growth by major project was provided. A list of new emerging oil sands crude types was also presented along with details of a synthetic bitumen blending synergy. Maps of Western Canadian crude oil markets were provided, along with details of refinery and market demand by crude type. Various pipeline alternatives to new markets were examined, with reference to Enbridge Pipeline's supply and capacity. Details of the Hardisty to U.S Gulf Coast Pipeline and the Edmonton to Prince Rupert Pipeline and its terminal and dock facilities were presented. It was concluded that pipeline capacity and seasonal factors will influence market demand, while linefill, crude types and the quality of the product will influence operational strategies. tabs., figs

  12. Long-distance fiber optic sensing solutions for pipeline leakage, intrusion, and ground movement detection

    Science.gov (United States)

    Nikles, Marc

    2009-05-01

    An increasing number of pipelines are constructed in remote regions affected by harsh environmental conditions where pipeline routes often cross mountain areas which are characterized by unstable grounds and where soil texture changes between winter and summer increase the probability of hazards. Third party intentional interference or accidental intrusions are a major cause of pipeline failures leading to large leaks or even explosions. Due to the long distances to be monitored and the linear nature of pipelines, distributed fiber optic sensing techniques offer significant advantages and the capability to detect and localize pipeline disturbance with great precision. Furthermore pipeline owner/operators lay fiber optic cable parallel to transmission pipelines for telecommunication purposes and at minimum additional cost monitoring capabilities can be added to the communication system. The Brillouin-based Omnisens DITEST monitoring system has been used in several long distance pipeline projects. The technique is capable of measuring strain and temperature over 100's kilometers with meter spatial resolution. Dedicated fiber optic cables have been developed for continuous strain and temperature monitoring and their deployment along the pipeline has enabled permanent and continuous pipeline ground movement, intrusion and leak detection. This paper presents a description of the fiber optic Brillouin-based DITEST sensing technique, its measurement performance and limits, while addressing future perspectives for pipeline monitoring. The description is supported by case studies and illustrated by field data.

  13. Citizenship program in near communities of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mascarenhas, Carina R.; Vilas Boas, Ianne P. [TELSAN Engenharia, Belo Horizonte, MG (Brazil); Bourscheid, Pitagoras [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    During the construction of a pipeline, the IENE - Engineering Unit of PETROBRAS, responsible for the construction and erection of pipelines and related plants in northeastern Brazil, crossed more than 7 states and 250 counties, had implemented a social responsibility program, in special a citizenship program. This action was the result of community studies located near of the pipelines AID - Direct Influence Area (438 yards right and left of the pipeline) and through the evidence that those locations were poor and have no personal documents and citizen position in society. This paper intents to share the experience of IENE about its citizen program that worked in three big lines: community mobilization; citizenship qualification; and citizenship board. This last one, turns possible to people obtains theirs personal documents and exercise the plenitude of citizenship. (author)

  14. Challenges in the development of market-based pipeline investments

    International Nuclear Information System (INIS)

    Von Bassenheim, G.; Mohitpour, M.; Klaudt, D.; Jenkins, A.

    2000-01-01

    The challenges, risks and uncertainties that the natural gas industry faces in developing market-based pipeline projects were discussed. Market-based pipeline investments are fundamentally different from user-driven projects. Market-based projected involve finding enough energy users and linking them with a pipeline infrastructure to viable supplies of natural gas. Each unique project is developed individually and requires a strong corporate vision and support before it can be successfully implemented. The three phases of a pipeline investment include the business development phase, the project development phase, and the implementation/operations phase. Market-based companies will need a clear vision for long-term goals and the desire to succeed. The company will have to prepare a detailed strategy and policies that clearly define geographic areas of operations, risk tolerance, availability of capital and expected project performance. 3 refs., 3 tabs., 2 figs

  15. Evaluation of satellite technology for pipeline route surveillance and the prevention of third party interference damage

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil [Penspen Integrity, Newcastle upon Tyne (United Kingdom)]. E-mail: r.palmer-jones@penspen.com; p.hopkins@penspen.com; Fraser, Andy [Integrated Statistical Solutions (United States)]. E-mail: andy@issquared.co.uk; Dezobry, Jerome [Gas de France, Paris (France)]. E-mail: jerome.dezobry@gazdefrance.com; Merrienboer, Hugo Van [Gasunie, Groningen (Netherlands)]. E-mail: H.A.M.van.Merrienboer@gasunie.nl

    2003-07-01

    The damage caused by Third Party Interference (TPI) is one of the major causes of pipeline failures. Consequently, new technologies for identifying activities that may cause damage to our pipelines are constantly being developed. A recently completed project sponsored by a number of pipeline operators has investigated the use of high-resolution satellites for the integrity management of onshore transmission pipelines. The sponsors were BG Technology (on behalf of Transco), Dansk Olie NatureGas, Gasunie, BP, Gaz de France, Distrigas, and the Health and Safety Executive. The project started with a general review of the satellite technologies available and their potential. The study was then focussed on the identification of activities that might result in damage to the pipeline and the potential of high-resolution optical satellites in identifying hazardous activities. A key element of the study was a comparison with existing surveillance systems, which generally involve regular aerial patrols of the pipeline route. To achieve this a survey was carried out to try and evaluate the costs and benefits of existing systems. In addition a simple model for analysing the cost benefit of pipeline surveillance was constructed, and a functional specification for a surveillance system drafted. Finally the performance of the IKONOS 2 high-resolution satellite system was tested in a controlled experiment using targets placed along a pipeline route. The results of this test were compared with a similar test of helicopter-based surveillance carried out by one of the sponsors. (author)

  16. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  17. Bp'S Baku-Tbilisi-Ceyhan pipeline: the new corporate colonialism.

    Science.gov (United States)

    Marriott, James; Muttitt, Greg

    2006-01-01

    An international campaign was waged questioning the benefits of BP's Baku-Tbilisi-Ceyhan pipeline in an effort to avoid a "zone of sacrifice" there. This article is an offshoot of that effort and explains the contemporary struggle over the pipeline project. The authors describe the project's background and evaluate the actual and potential impacts of the project in which they consider eight areas. They also assess BP's capacity to confront resistance to the pipeline.

  18. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  19. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  20. Thinking on Sichuan-Chongqing gas pipeline transportation system reform under market-oriented conditions

    Science.gov (United States)

    Duan, Yanzhi

    2017-01-01

    The gas pipeline networks in Sichuan and Chongqing (Sichuan-Chongqing) region have formed a fully-fledged gas pipeline transportation system in China, which supports and promotes the rapid development of gas market in Sichuan-Chongqing region. In the circumstances of further developed market-oriented economy, it is necessary to carry out further the pipeline system reform in the areas of investment/financing system, operation system and pricing system to lay a solid foundation for improving future gas production and marketing capability and adapting itself to the national gas system reform, and to achieve the objectives of multiparty participated pipeline construction, improved pipeline transportation efficiency and fair and rational pipeline transportation prices. In this article, main thinking on reform in the three areas and major deployment are addressed, and corresponding measures on developing shared pipeline economy, providing financial support to pipeline construction, setting up independent regulatory agency to enhance the industrial supervision for gas pipeline transportation, and promoting the construction of regional gas trade market are recommended.

  1. Pipeline investigation report : crude oil pipeline-third party damage : Trans Mountain Pipeline LP 610 millimetre-diameter crude oil pipeline : kilometre post 3.10, Westridge dock transfer line, Burnaby, British Columbia

    International Nuclear Information System (INIS)

    2009-03-01

    This report discussed an oil spill which occurred in July 2007 when a contractor's excavator bucket punctured a pipeline during the excavation of a trench for a new storm sewer line at a location in Burnaby, British Columbia (BC). The puncture caused the release of approximately 234 cubic meters of crude oil, which flowed into Burrard Inlet Bay via a storm sewer system. Eleven houses were sprayed with crude oil, and many other properties required restoration. Approximately 250 residents left their homes. While emergency workers and firefighters responding to the incident were sprayed with crude oil, no explosions, fires, or injuries occurred. The report provided details of studies conducted to determine the placement of the sewer line, as well as attempts made by the contractors to determine the lateral connection of the crude oil pipeline. Discrepancies between the location of the pipeline design drawing and its actual location on other construction drawings were also noted by the contractor. Twenty-four minutes after the rupture, the terminal was fully isolated and the drain-down of the pipeline was completed within an hour. The cause of the accident was attributed to inaccurate construction drawings and inadequate communications between contractors and consulting companies. 3 figs

  2. Hydrogeological considerations in northern pipeline development. [Permafrost affected by hot or chilled pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Harlan, R L

    1974-11-01

    Some of the hydrogeological implications of construction and operation of oil and gas pipelines in northern regions of Canada are considered in relation to their potential environmental impacts and those factors affecting the security of the pipeline itself. Although the extent to which water in permafrost participates in the subsurface flow regime has not been fully demonstrated, the role of liquid as well as vapor transport in frozen earth materials can be shown from theory to be highly significant; water movement rates in frozen soil are on the same order as those in unsaturated, unfrozen soil. Below 0/sup 0/C, the unfrozen water content in a fine-grained porous medium is dependent on temperature but independent of the total water content. The thermal gradient controls the rate and direction of water movement in permafrost. The groundwater stabilizes the streamflow and in the absence of large lakes provides the main source of flow during the winter. As groundwater is frequently confined by the permafrost, degradation of the permafrost can have significant consequences. The thaw bulb formed around a hot oil pipeline can induce liquefactioned flow of the thawed material. A chilled pipeline could restrict groundwater movement, resulting in buildup of artesian conditions and icings. The liberation and absorption of latent heat on freezing and thawing affects the thermal regime in the ground surface. Recommendations are given for pipeline construction and areas for further study pointed out. (DLC)

  3. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  4. Finding of No Significant Impact Construction of a New Water Pipeline, Travis Air Force Base, Solano County, California

    Science.gov (United States)

    2003-09-03

    Soun:e: California State Automobile Association, Bay and Maunt.Ul Secllon 1999 North Gate Road Pipeline Project Travis Air Force Base, California J... HRm ·----~----~-------~~-,~··--------~---- TrlnomlaJ , , , , r. Page_i_of~ *Resource Name or# (Assigned by recorder) -.:N

  5. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  6. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  7. The great pipeline debate : the Minister of everything

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    This article described the challenges facing Trans-Canada Pipelines (TCPL) in the 1950s regarding the construction of a pipeline to deliver gas to central Canadian markets. Alberta had been granted gas export permits, and the proposed pipeline was financed primarily by American interests. In addition, TCPL had difficulties with several competing proposals to move gas east from Alberta. There was also opposition to TCPL's original route which was through American territory. When the pipeline was rerouted through rugged Precambrian Shield, private-sector financiers balked at the additional costs. During the Great Pipeline debate in 1956, federal Minister C.D. Howe encouraged TCPL and its competitors to merge and put a bill before Parliament to create a Crown corporation to build and own the Canadian Shield portion of the line, leasing it back to TCPL. The first president of TCPL was Eldon Tanner, member of Alberta's Legislative Assembly. He remained at the helm until the pipeline was completed. Industrialist Frank McMahon who participated in drilling activities in British Columbia and at Turner Valley, Alberta, also promoted a plan to complete the construction of the Westcoast Transmission pipeline from the Peace River, Canada's first large natural-gas pipeline. 4 figs

  8. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  9. The challenge of managing environmental, health, safety and social (EHS and S) aspects of a short term pipeline construction project; El desafio del manejo ambiental, de la salud, de la seguridad y de aspectos sociales del proyecto de construccion a corto plazo de un gasoducto

    Energy Technology Data Exchange (ETDEWEB)

    Zuelta, Edgar A.; Cgavez, Rafael [Transierra S.A. (Bolivia)

    2003-07-01

    The TRANSIERRA pipeline construction project, a 432 Km, 32'' pipeline located in the southern part of Bolivia was ready to kick off, waiting for an Administrative Concession that would allow the project to proceed. The implementation of the EHS Management Plan and the Social Strategies Plan was designed to get the Environmental Permits for changes generated with the detailed engineering design, Clear Cutting License, and a Negotiated agreements with representatives of the 8 Indigenous People's Territories and 6 Municipalities a long the ROW. Any delays due to our failure in achieving the necessary permits would have had an impact in fulfilling the already challenging one year schedule and stand by costs. TRANSIERRA designed a strategy to approach each of the EHS and S aspects in order to meet deadlines, yet implementing a solid EHS and S management system. The necessary resources were deployed to ensure compliance at all levels. The reforestation process required of 35 native species. There were neither seeds nor most of the plants available to complete this task. In addition no data was available on seed processing to successfully grow the number of required individuals; therefore TRANSIERRA developed and implemented a program to reach the reforestation objective. (author)

  10. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Final EIR/EIS

    International Nuclear Information System (INIS)

    1994-01-01

    On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments

  11. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  12. The cost of pipelining climate change mitigation. An overview of the economics of CH4, CO2 and H2 transportation

    Energy Technology Data Exchange (ETDEWEB)

    Van der Zwaan, B.C.C.; Schoots, K.; Rivera-Tinoco, R. [Energy research Center of the Netherlands (ECN), Policy Studies Department, Amsterdam (Netherlands); Verbong, G.P.J. [Eindhoven University of Technology, Department of Industrial Engineering and Innovation Sciences, Eindhoven (Netherlands)

    2011-11-15

    Gases like CH4, CO2 and H2 may play a key role in establishing a sustainable energy system: CH4 is the least carbon-intensive fossil energy resource; CO2 capture and storage can significantly reduce the climate footprint of especially fossil-based electricity generation; and the use of H2 as energy carrier could enable carbon-free automotive transportation. Yet the construction of large pipeline infrastructures usually constitutes a major and time-consuming undertaking, because of safety and environmental issues, legal and (geo)political siting arguments, technically untrivial installation processes, and/or high investment cost requirements. In this article we focus on the latter and present an overview of both the total costs and cost components of the distribution of these three gases via pipelines. Possible intricacies and external factors that strongly influence these costs, like the choice of location and terrain, are also included in our analysis. Our distribution cost breakdown estimates are based on transportation data for CH4, which we adjust for CO2 and H2 in order to account for the specific additional characteristics of these two gases. The overall trend is that pipeline construction is no longer subject to significant cost reductions. For the purpose of designing energy and climate policy we therefore know in principle with reasonable certainty what the minimum distribution cost components of future energy systems are that rely on pipelining these gases. We describe the reasons why we observe limited learning-by-doing and explain why negligible construction cost reductions for future CH4, CO2 and H2 pipeline projects can be expected. Cost data of individual pipeline projects may strongly deviate from the global average because of national or regional effects related to the type of terrain, but also to varying costs of labor and fluctuating market prices of components like steel.

  13. Basic study for Joint Implementation Pipeline System Optimization Project including rehabilitation of gas pipeline in Ukraine for greenhouse gas reduction

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a study was conducted of a project for repair/optimization of the Shebelinka, Dikanka-Kyiv, gas pipeline system in the Republic of Ukraine. As a result of the study, the following plans were proposed. The gas turbine compressor now in use has been used more than 30 years, and is needed to be changed due to the superannuation. Changes are needed of the equipment used for pipeline inspection, corrosion prevention equipment, damaged data collecting equipment, pressure detection automatic drive valve, etc. Further needed are a portable compressor by which repair work can be done without gas release into the atmospheric air. The investment required for repair/installation of these equipment totaled approximately 216 million dollars. This brings the reduction in greenhouse effect gas emissions of 512,000 tons/year, and the energy conservation of 103,000 tons/year of crude oil or its equivalent. These are estimated at about 10 million dollars in greenhouse effect gas reduction and at 15 million dollars in energy conservation. (NEDO)

  14. Landscape susceptibility, hazard and risk assessments along pipeline corridors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Blais-Stevens, A.; Couture, R.; Page, A. [Natural Resources Canada, Ottawa, ON (Canada). Geological Survey of Canada; Koch, J.; Clague, J.J. [Simon Fraser Univ., Burnaby, BC (Canada); Lipovsky, P.S. [Yukon Geological Survey, Whitehorse, YT (Canada)

    2010-07-01

    This article discussed work that was carried out to inventory landslides and assess hazards along two proposed gas-pipeline routes in the North. Landslide inventories and hazard assessments are necessary to quantify and qualify the risk of environmental impacts from landslides on linear infrastructure. The Yukon Alaska Highway Pipeline and the Mackenzie Gas Project Pipeline, which will both be over 800 kilometres in length, will cross harsh landscapes characterized by permafrost terrain and will be at risk from geological hazards, including landslides with debris flows, earthquakes, subsidence, and permafrost degradation. The work involved inventorying and mapping landslides via aerial photography and field visits to identify the frequency-magnitude relationships for debris flow fans along the route and the creation of qualitative parametric landslide maps for both proposed pipeline corridors. A good correlation was found between actual landslide distribution and the landslide susceptibility maps. For the Mackenzie Valley Pipeline Corridor, most landslides have occurred in fine unconsolidated sediments and shallow slopes. Landslides in the Yukon Alaska Highway Corridor mostly happened in unconsolidated sediments, but a few took place in bedrock with high relief. The preliminary investigation revealed that a slope hazard exists in both corridors and must be taken into account during pipeline development. The results are intended to facilitate better decision-making for planning, constructing, and maintaining safe and economically viable pipeline routes in Northern Canada. The mapping methodology was outlined. 13 refs., 1 tab., 6 figs.

  15. The Mississippi CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  16. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  17. Snow as building material for construction of technological along-the-route roads of main pipelines

    Science.gov (United States)

    Merdanov, S. M.; Egorov, A. L.; Kostyrchenko, V. A.; Madyarov, T. M.

    2018-05-01

    The article deals with the process of compacting snow in a closed volume with the use of vacuum processing for the construction of technological along-the-route roads of main pipelines. The relevance of the chosen study is substantiated; methods and designs for snow compaction are considered. The publication activity and defenses of doctoral and candidate dissertations on the research subject are analyzed. Patent analysis of existing methods and equipment for snow compaction with indication of their disadvantages is carried out. A design calculation was carried out using computer programs in which a strength calculation was performed to identify the most stressed places in the construction of a vibrating hydraulic tyre-type roller. A 3D model of the experimental setup was developed.

  18. Public perceptions of CO2 transportation in pipelines

    International Nuclear Information System (INIS)

    Gough, Clair; O'Keefe, Laura; Mander, Sarah

    2014-01-01

    This paper explores the response by members of the lay public to the prospect of an onshore CO 2 pipeline through their locality as part of a proposed CCS development and presents results from deliberative Focus Groups held along a proposed pipeline route. Although there is a reasonable level of general knowledge about CO 2 across the lay public, understanding of its specific properties is more limited. The main concerns expressed around pipelines focused on five areas: (i) safe operation of the pipeline; (ii) the risks to people, livestock and vegetation arising from the leakage of CO 2 from the pipeline; (iii) the innovative and ‘first of its kind' nature of the pipeline and the consequent lack of operational CO 2 pipelines in the UK to demonstrate the technology; (iv) impacts on coastal erosion at the landfall site; and (v) the potential disruption to local communities during pipeline construction. Participants expressed scepticism over the motivations of CO 2 pipeline developers. Trust that the developer will minimise risk during the route selection and subsequent construction, operation and maintenance of the pipeline is key; building trust within the local community requires early engagement processes, tailored to deliver a variety of engagement and information approaches. - Highlights: • Lay publics express good general knowledge of CO 2 but not of its specific properties. • Key concerns relate to risk and safety and ‘first of a kind' nature of CO 2 pipeline. • Group participants are sceptical about motivations of CO 2 pipeline developers. • Communities' trust in developer is a major element of their risk assessment

  19. Improved cost models for optimizing CO2 pipeline configuration for point-to-point pipelines and simple networks

    NARCIS (Netherlands)

    Knoope, M. M. J.|info:eu-repo/dai/nl/364248149; Guijt, W.; Ramirez, A.|info:eu-repo/dai/nl/284852414; Faaij, A. P. C.

    In this study, a new cost model is developed for CO2 pipeline transport, which starts with the physical properties of CO2 transport and includes different kinds of steel grades and up-to-date material and construction costs. This pipeline cost model is used for a new developed tool to determine the

  20. Pipelines, inexpensive and safe mode of transport

    Energy Technology Data Exchange (ETDEWEB)

    Grover, D D

    1979-01-01

    Pipelines are the leading bulk commodity transporter and should play an even more important role in the future of energy transportation and distribution. As fossil fuel and low-cost uranium resources become depleted, it will be economical to produce hydrogen by electrolysis and transport it through underground pipelines to points of consumption. The cost would be only two to three times that of transporting natural gas per unit of heat energy and substantially less than the cost of transporting electric energy in overhead, extra-high-voltage transmission lines. Pipeline design, including economic pipe diameter; pipe material; operation by remote control and automation; cathodic protection; pipeline construction; and pipeline maintenance, particularly as regards the 1157 km long Oil India Pipeline, are discussed.

  1. Overview of interstate hydrogen pipeline systems

    International Nuclear Information System (INIS)

    Gillette, J.L.; Kolpa, R.L.

    2008-01-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  2. Overview of interstate hydrogen pipeline systems.

    Energy Technology Data Exchange (ETDEWEB)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  3. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  4. Canadian pipeline transportation system : transportation assessment

    International Nuclear Information System (INIS)

    2009-07-01

    In addition to regulating the construction and operation of 70,000 km of oil and natural gas pipelines in Canada, the National Energy Board (NEB) regulates the trade of natural gas, oil and natural gas liquids. This report provided an assessment of the Canadian hydrocarbon transportation system in relation to its ability to provide a robust energy infrastructure. Data was collected from NEB-regulated pipeline companies and a range of publicly available sources to determine if adequate pipeline capacity is in place to transport products to consumers. The NEB also used throughput and capacity information received from pipeline operators as well as members of the investment community. The study examined price differentials compared with firm service tolls for transportation paths, as well as capacity utilization on pipelines and the degree of apportionment on major oil pipelines. This review indicated that in general, the Canadian pipeline transportation system continues to work effectively, with adequate pipeline capacity in place to move products to consumers who need them. 9 tabs., 30 figs., 3 appendices.

  5. The Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-06-30

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

  6. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  7. Stress analysis and mitigation measures for floating pipeline

    Science.gov (United States)

    Wenpeng, Guo; Yuqing, Liu; Chao, Li

    2017-03-01

    Pipeline-floating is a kind of accident with contingency and uncertainty associated to natural gas pipeline occurring during rainy season, which is significantly harmful to the safety of pipeline. Treatment measures against pipeline floating accident are summarized in this paper on the basis of practical project cases. Stress states of pipeline upon floating are analyzed by means of Finite Element Calculation method. The effectiveness of prevention ways and subsequent mitigation measures upon pipeline-floating are verified for giving guidance to the mitigation of such accidents.

  8. The organizational learning in the search of the environmental and social sustainability: an applied Brazilian experience in a project of constructions of gas-pipeline in the Amazon Forest; A aprendizagem organizacional na busca da sustentabilidade ambiental e social: uma experiencia brasileira aplicada em um projeto de construcao de gasoduto na Floresta Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Mannarino, Ronaldo P. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The experience of PETROBRAS's performance, when the implantation of the province of Urucu, in the City of Coari, state of Amazon, was constructed on empirical bases and it had as a support landmark the lines of direction dictated in 1988 for famous scientists who acted directly in the Amazon Region. The application of these lines of direction gave support to the implantation of essential activities, such as a fishery of changes, the recovery of sanded small rivers, prevention of spills and the opening of chances for research in that further and little known basin of the Urucu River. The convergence was that PETROBRAS made use of the logistic that the scientists needed; and they made use of the knowledge that the company needed. It was just necessary to adjust the language. The results had been very effective and the province of Urucu became the pioneer and the most expressive unit in environmental management in PETROBRAS. In 1999 the Project PIATAM was implanted: Potential Impacts and Risks of the Transport of Oil and Gas in Amazon, taking care of demands of the future transport of the natural gas to Manaus for gas-pipeline, that became possible in 2003 thanks to the support of the research, whose results had fully taken care of the demands of the environmental licensing of the workmanship. The current work synthesizes the bases of knowledge and the results gotten with the application of these bases in a project of construction of a gas-pipeline of 652 kilometers in full Amazonian forest. In the construction phase, one more time the integration with the scientific community was essential to guarantee the application of the concepts of environment in the workmanship of the Gas-pipeline Urucu - Manaus, with advising of teams from the INPA, like Limnology and of combat the tropical illnesses, as the malaria. Another point of support was the partnership with the Secretariat of Sustainable Development of Amazon in an Accord of application of resources, in 135

  9. The organizational learning in the search of the environmental and social sustainability: an applied Brazilian experience in a project of constructions of gas-pipeline in the Amazon Forest; A aprendizagem organizacional na busca da sustentabilidade ambiental e social: uma experiencia brasileira aplicada em um projeto de construcao de gasoduto na Floresta Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Mannarino, Ronaldo P [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The experience of PETROBRAS's performance, when the implantation of the province of Urucu, in the City of Coari, state of Amazon, was constructed on empirical bases and it had as a support landmark the lines of direction dictated in 1988 for famous scientists who acted directly in the Amazon Region. The application of these lines of direction gave support to the implantation of essential activities, such as a fishery of changes, the recovery of sanded small rivers, prevention of spills and the opening of chances for research in that further and little known basin of the Urucu River. The convergence was that PETROBRAS made use of the logistic that the scientists needed; and they made use of the knowledge that the company needed. It was just necessary to adjust the language. The results had been very effective and the province of Urucu became the pioneer and the most expressive unit in environmental management in PETROBRAS. In 1999 the Project PIATAM was implanted: Potential Impacts and Risks of the Transport of Oil and Gas in Amazon, taking care of demands of the future transport of the natural gas to Manaus for gas-pipeline, that became possible in 2003 thanks to the support of the research, whose results had fully taken care of the demands of the environmental licensing of the workmanship. The current work synthesizes the bases of knowledge and the results gotten with the application of these bases in a project of construction of a gas-pipeline of 652 kilometers in full Amazonian forest. In the construction phase, one more time the integration with the scientific community was essential to guarantee the application of the concepts of environment in the workmanship of the Gas-pipeline Urucu - Manaus, with advising of teams from the INPA, like Limnology and of combat the tropical illnesses, as the malaria. Another point of support was the partnership with the Secretariat of Sustainable Development of Amazon in an Accord of application of resources, in 135

  10. Differential subsidence and its effect on subsurface infrastructure: predicting probability of pipeline failure (STOOP project)

    Science.gov (United States)

    de Bruijn, Renée; Dabekaussen, Willem; Hijma, Marc; Wiersma, Ane; Abspoel-Bukman, Linda; Boeije, Remco; Courage, Wim; van der Geest, Johan; Hamburg, Marc; Harmsma, Edwin; Helmholt, Kristian; van den Heuvel, Frank; Kruse, Henk; Langius, Erik; Lazovik, Elena

    2017-04-01

    Due to heterogeneity of the subsurface in the delta environment of the Netherlands, differential subsidence over short distances results in tension and subsequent wear of subsurface infrastructure, such as water and gas pipelines. Due to uncertainties in the build-up of the subsurface, however, it is unknown where this problem is the most prominent. This is a problem for asset managers deciding when a pipeline needs replacement: damaged pipelines endanger security of supply and pose a significant threat to safety, yet premature replacement raises needless expenses. In both cases, costs - financial or other - are high. Therefore, an interdisciplinary research team of geotechnicians, geologists and Big Data engineers from research institutes TNO, Deltares and SkyGeo developed a stochastic model to predict differential subsidence and the probability of consequent pipeline failure on a (sub-)street level. In this project pipeline data from company databases is combined with a stochastic geological model and information on (historical) groundwater levels and overburden material. Probability of pipeline failure is modelled by a coupling with a subsidence model and two separate models on pipeline behaviour under stress, using a probabilistic approach. The total length of pipelines (approx. 200.000 km operational in the Netherlands) and the complexity of the model chain that is needed to calculate a chance of failure, results in large computational challenges, as it requires massive evaluation of possible scenarios to reach the required level of confidence. To cope with this, a scalable computational infrastructure has been developed, composing a model workflow in which components have a heterogeneous technological basis. Three pilot areas covering an urban, a rural and a mixed environment, characterised by different groundwater-management strategies and different overburden histories, are used to evaluate the differences in subsidence and uncertainties that come with

  11. CFSAN SNP Pipeline: an automated method for constructing SNP matrices from next-generation sequence data

    Directory of Open Access Journals (Sweden)

    Steve Davis

    2015-08-01

    Full Text Available The analysis of next-generation sequence (NGS data is often a fragmented step-wise process. For example, multiple pieces of software are typically needed to map NGS reads, extract variant sites, and construct a DNA sequence matrix containing only single nucleotide polymorphisms (i.e., a SNP matrix for a set of individuals. The management and chaining of these software pieces and their outputs can often be a cumbersome and difficult task. Here, we present CFSAN SNP Pipeline, which combines into a single package the mapping of NGS reads to a reference genome with Bowtie2, processing of those mapping (BAM files using SAMtools, identification of variant sites using VarScan, and production of a SNP matrix using custom Python scripts. We also introduce a Python package (CFSAN SNP Mutator that when given a reference genome will generate variants of known position against which we validate our pipeline. We created 1,000 simulated Salmonella enterica sp. enterica Serovar Agona genomes at 100× and 20× coverage, each containing 500 SNPs, 20 single-base insertions and 20 single-base deletions. For the 100× dataset, the CFSAN SNP Pipeline recovered 98.9% of the introduced SNPs and had a false positive rate of 1.04 × 10−6; for the 20× dataset 98.8% of SNPs were recovered and the false positive rate was 8.34 × 10−7. Based on these results, CFSAN SNP Pipeline is a robust and accurate tool that it is among the first to combine into a single executable the myriad steps required to produce a SNP matrix from NGS data. Such a tool is useful to those working in an applied setting (e.g., food safety traceback investigations as well as for those interested in evolutionary questions.

  12. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large

  13. Thermal expansion absorbing structure for pipeline

    International Nuclear Information System (INIS)

    Nagata, Takashi; Yamashita, Takuya.

    1995-01-01

    A thermal expansion absorbing structure for a pipeline is disposed to the end of pipelines to form a U-shaped cross section connecting a semi-circular torus shell and a short double-walled cylindrical tube. The U-shaped longitudinal cross-section is deformed in accordance with the shrinking deformation of the pipeline and absorbs thermal expansion. Namely, since the central lines of the outer and inner tubes of the double-walled cylindrical tube deform so as to incline, when the pipeline is deformed by thermal expansion, thermal expansion can be absorbed by a simple configuration thereby enabling to contribute to ensure the safety. Then, the entire length of the pipeline can greatly be shortened by applying it to the pipeline disposed in a high temperature state compared with a method of laying around a pipeline using only elbows, which has been conducted so far. Especially, when it is applied to a pipeline for an FBR-type reactor, the cost for the construction of a facility of a primary systems can greater be reduced. In addition, it can be applied to a pipeline for usual chemical plants and any other structures requiring absorption of deformation. (N.H.)

  14. optimization for trenchless reconstruction of pipelines

    Directory of Open Access Journals (Sweden)

    Zhmakov Gennadiy Nikolaevich

    2015-01-01

    Full Text Available Today the technologies of trenchless reconstruction of pipelines are becoming and more widely used in Russia and abroad. One of the most perspective is methods is shock-free destruction of the old pipeline being replaced with the help of hydraulic installations with working mechanism representing a cutting unit with knife disks and a conic expander. A construction of a working mechanism, which allows making trenchless reconstruction of pipelines of different diameters, is optimized and patented and its developmental prototype is manufactured. The dependence of pipeline cutting force from knifes obtusion of the working mechanisms. The cutting force of old steel pipelines with obtuse knife increases proportional to the value of its obtusion. Two stands for endurance tests of the knifes in laboratory environment are offered and patented.

  15. Review of the effects of in-stream pipeline crossing construction on aquatic ecosystems and examination of Canadian methodologies for impact assessment.

    Science.gov (United States)

    Lévesque, Lucie M; Dubé, Monique G

    2007-09-01

    Pipeline crossing construction alters river and stream channels, hence may have detrimental effects on aquatic ecosystems. This review examines the effects of crossing construction on fish and fish habitat in rivers and streams, and recommends an approach to monitoring and assessment of impacts associated with these activities. Pipeline crossing construction is shown to not only compromise the integrity of the physical and chemical nature of fish habitat, but also to affect biological habitat (e.g., benthic invertebrates and invertebrate drift), and fish behavior and physiology. Indicators of effect include: water quality (total suspended solids TSS), physical habitat (substrate particle size, channel morphology), benthic invertebrate community structure and drift (abundance, species composition, diversity, standing crop), and fish behavior and physiology (hierarchy, feeding, respiration rate, loss of equilibrium, blood hematocrit and leukocrit levels, heart rate and stroke volume). The Before-After-Control-Impact (BACI) approach, which is often applied in Environmental Effects Monitoring (EEM), is recommended as a basis for impact assessment, as is consideration of site-specific sensitivities, assessment of significance, and cumulative effects.

  16. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  17. Buoyed by geophysics : geophysics, just-in-time procurement help save millions on Ekwan pipeline buoyancy control

    Energy Technology Data Exchange (ETDEWEB)

    Roche, P.

    2005-09-01

    Large-diameter natural gas pipelines buried in wet muskeg have the potential to rise to the surface due to buoyancy. Until recently, the most reliable method to prevent this was to attach specially manufactured bolt-on concrete weights at closely spaced intervals. However, these weights significantly increase capital budgets by millions of dollars because each weight weighs 2,540 kg and costs $1,000. A less costly alternative for buoyancy control in shallow muskeg is for the contractor to simply dig a deeper ditch. Another option is to hold down the pipeline by polyester straps attached to screw anchors. The challenge of applying these less costly options is that heavy equipment cannot be brought to the site to determine ground conditions until after all procurement, assessment and design is completed. Engineers must therefore select a buoyancy control measure based only on air photos and possibly a few drill holes. However, air photos do not indicate the depth of muskeg. Although some muskeg areas may turn out to be thick enough to avoid buoyancy control altogether, once construction is underway, it is too late to opt for cheaper alternatives. EnCana Corporation's 24-inch Ekwan pipeline was recently constructed through a remote area of British Columbia to connect the Greater Sierra natural gas discovery to a tie-in point on Nova Gas Transmission's northwest mainline. Air photos indicated that half of the route was through muskeg. AMEC E and C Services Inc. was responsible for the engineering and management of the project. The company used a combination of geophysical techniques to learn about the ground conditions. Toboggan mounted portable equipment was hauled by snowmobiles along trails made earlier by the survey crews. Ground penetrating radar assessed the muskeg thickness. Fixed frequency electromagnetic surveys also enhanced the results of the ground penetrating radar. The number of bolt-on weights was reduced from 9,000 to 3,700, a savings of $3

  18. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  19. The participation of indigenous peoples and other stake holders in the Yacuiba Rio Grande pipeline reforestation project

    Energy Technology Data Exchange (ETDEWEB)

    Zuleta, Edgar A. [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The Yacuiba - Rio Grande Pipeline (GASYRG), located in the southern part of Bolivia, is a 432 km, 32 inches pipeline. Its ROW layout goes through three states, 6 municipalities and eight recognized Indigenous Peoples Territories. Seven of these territories belong to the Guarani people and one to the Weenhayek. An extensive Environmental Impact Assessment (EIA) was conducted prior to the construction period. The EIA included a Public Consultation and Disclosure processes. One of the key requests from every town, municipality or indigenous communities was to have as many job opportunities as possible. An other concern was regarding the application of an environmental management plan for their territories, being the reforestation a great concern. (author)

  20. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    International Nuclear Information System (INIS)

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-01-01

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures

  1. Towards a Fuzzy Bayesian Network Based Approach for Safety Risk Analysis of Tunnel-Induced Pipeline Damage.

    Science.gov (United States)

    Zhang, Limao; Wu, Xianguo; Qin, Yawei; Skibniewski, Miroslaw J; Liu, Wenli

    2016-02-01

    Tunneling excavation is bound to produce significant disturbances to surrounding environments, and the tunnel-induced damage to adjacent underground buried pipelines is of considerable importance for geotechnical practice. A fuzzy Bayesian networks (FBNs) based approach for safety risk analysis is developed in this article with detailed step-by-step procedures, consisting of risk mechanism analysis, the FBN model establishment, fuzzification, FBN-based inference, defuzzification, and decision making. In accordance with the failure mechanism analysis, a tunnel-induced pipeline damage model is proposed to reveal the cause-effect relationships between the pipeline damage and its influential variables. In terms of the fuzzification process, an expert confidence indicator is proposed to reveal the reliability of the data when determining the fuzzy probability of occurrence of basic events, with both the judgment ability level and the subjectivity reliability level taken into account. By means of the fuzzy Bayesian inference, the approach proposed in this article is capable of calculating the probability distribution of potential safety risks and identifying the most likely potential causes of accidents under both prior knowledge and given evidence circumstances. A case concerning the safety analysis of underground buried pipelines adjacent to the construction of the Wuhan Yangtze River Tunnel is presented. The results demonstrate the feasibility of the proposed FBN approach and its application potential. The proposed approach can be used as a decision tool to provide support for safety assurance and management in tunnel construction, and thus increase the likelihood of a successful project in a complex project environment. © 2015 Society for Risk Analysis.

  2. Pydpiper: a flexible toolkit for constructing novel registration pipelines.

    Science.gov (United States)

    Friedel, Miriam; van Eede, Matthijs C; Pipitone, Jon; Chakravarty, M Mallar; Lerch, Jason P

    2014-01-01

    Using neuroimaging technologies to elucidate the relationship between genotype and phenotype and brain and behavior will be a key contribution to biomedical research in the twenty-first century. Among the many methods for analyzing neuroimaging data, image registration deserves particular attention due to its wide range of applications. Finding strategies to register together many images and analyze the differences between them can be a challenge, particularly given that different experimental designs require different registration strategies. Moreover, writing software that can handle different types of image registration pipelines in a flexible, reusable and extensible way can be challenging. In response to this challenge, we have created Pydpiper, a neuroimaging registration toolkit written in Python. Pydpiper is an open-source, freely available software package that provides multiple modules for various image registration applications. Pydpiper offers five key innovations. Specifically: (1) a robust file handling class that allows access to outputs from all stages of registration at any point in the pipeline; (2) the ability of the framework to eliminate duplicate stages; (3) reusable, easy to subclass modules; (4) a development toolkit written for non-developers; (5) four complete applications that run complex image registration pipelines "out-of-the-box." In this paper, we will discuss both the general Pydpiper framework and the various ways in which component modules can be pieced together to easily create new registration pipelines. This will include a discussion of the core principles motivating code development and a comparison of Pydpiper with other available toolkits. We also provide a comprehensive, line-by-line example to orient users with limited programming knowledge and highlight some of the most useful features of Pydpiper. In addition, we will present the four current applications of the code.

  3. Comparison of carbon footprints of steel versus concrete pipelines for water transmission.

    Science.gov (United States)

    Chilana, Lalit; Bhatt, Arpita H; Najafi, Mohammad; Sattler, Melanie

    2016-05-01

    The global demand for water transmission and service pipelines is expected to more than double between 2012 and 2022. This study compared the carbon footprint of the two most common materials used for large-diameter water transmission pipelines, steel pipe (SP) and prestressed concrete cylinder pipe (PCCP). A planned water transmission pipeline in Texas was used as a case study. Four life-cycle phases for each material were considered: material production and pipeline fabrication, pipe transportation to the job site, pipe installation in the trench, and operation of the pipeline. In each phase, the energy consumed and the CO2-equivalent emissions were quantified. It was found that pipe manufacturing consumed a large amount of energy, and thus contributed more than 90% of life cycle carbon emissions for both kinds of pipe. Steel pipe had 64% larger CO2-eq emissions from manufacturing compared to PCCP. For the transportation phase, PCCP consumed more fuel due to its heavy weight, and therefore had larger CO2-eq emissions. Fuel consumption by construction equipment for installation of pipe was found to be similar for steel pipe and PCCP. Overall, steel had a 32% larger footprint due to greater energy used during manufacturing. This study compared the carbon footprint of two large-diameter water transmission pipeline materials, steel and prestressed concrete cylinder, considering four life-cycle phases for each. The study provides information that project managers can incorporate into their decision-making process concerning pipeline materials. It also provides information concerning the most important phases of the pipeline life cycle to target for emission reductions.

  4. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  5. Alliance Pipeline : the new kid on the block

    International Nuclear Information System (INIS)

    Cornelson, D.

    1998-01-01

    An update on progress of Alliance Pipelines, comments on issues facing gas transporters from western Canada, some discussion of gas supply in general, and the prospects for future expansion of the natural gas industry are provided. According to industry insiders, North American gas demand is expected to increase by 1.5 per cent per year. In order for Canadian gas to participate in this growth additional pipeline capacity is needed. The Alliance Pipeline capacity represents about 20 per cent of this demand growth over the next 5 years. The Alliance Pipeline development will create an opportunity to deliver western Canadian gas to Chicago, a point where North American market competition exists and the market volume and liquidity is large. This presentation also provides an update on the current regulatory status and construction timing. Currently, Alliance has over C$8 billion in firm shipping commitments and up to C$5 billion in financing in place. Pipeline construction will begin in the spring of 1999; it is expected to be operational by the fall of 2000. tabs., figs

  6. Decision 99-13: Crestar Energy Inc. applications to construct and operate sour gas batteries and pipelines, Vulcan Field

    International Nuclear Information System (INIS)

    1999-06-01

    On 1 December 1998, the applicant applied pursuant to Part 4 of the Pipeline Act and Section 7.001 of the Oil and Gas Conservation Regulations for approval to construct and operate a sour gas pipeline and various surface facilities to tie in three wells. These are located at Legal Subdivision 12 of Section 36, Township 16, Range 24, West of the fourth Meridian (12-36 facility), Lsd 10-35-16-24 WM4 (10-35 facility), and Lsd 7-26-16-24 WM4 (7-26 facility), to an existing pipeline and proposed surface facility at Lsd 16-16-16-24 WM4. The 10-35, 7-26 and 16-16 facilities would each have a separator, a flare knockout drum, and a flare stack. The 12-36 facility would have two separators, one for each of the two producing zones at the 12-36 facility, a flare knockout drum, and flare stack. A compressor would be installed at the 16-16 facility. All fluids would be measured and re-injected into the pipeline for removal at the 16-16 facility. All proposed flare stacks would consists of a continuously burning sweet gas pilot and would be used for emergencies, routine well servicing, and pigging operations only. The pipeline would be designated as a Level 1 facility, and would transport up to 18 moles of hydrogen sulfide per kilomole of natural gas. Although the Board approved Application No. 1037084 after carefully considering the evidence, subject to meeting all the regulatory requirements and conditions set out in Attachment 1, it rejected Application No. 1033453

  7. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  8. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  9. Eesti Gaas. Inspection of Kohtal-Jaerve - Tallinn pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The project `Inspection of Pipelines in Estonia` was funded by Danish government and was carried out in collaboration between DONG, Balslev and FORCE. By agreement between Eesti Gaas and DONG, the pipeline system between Kohtla-Jaerve and Tallinn was selected for inspection. This pipeline system has a total length of 176.9 km. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. The objectives have been met as set out by the project Proposal with the investigation and this report as follows: Based on a document review together with the measurements and observations in the field and in the laboratory, the condition of approximately 5 km of the pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline. A further objective has been to provide know-how transfer in order to permit Eesti Gaas to run similar inspections on other parts of their transmission system. (EG)

  10. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines; L'oleoduc Bakou-Ceyhan: paradoxes et coherence de la strategie americaine des pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Jafalian, A

    2004-07-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  11. Preliminary results from the hierarchical glitch pipeline

    International Nuclear Information System (INIS)

    Mukherjee, Soma

    2007-01-01

    This paper reports on the preliminary results obtained from the hierarchical glitch classification pipeline on LIGO data. The pipeline that has been under construction for the past year is now complete and end-to-end tested. It is ready to generate analysis results on a daily basis. The details of the pipeline, the classification algorithms employed and the results obtained with one days analysis on the gravitational wave and several auxiliary and environmental channels from all three LIGO detectors are discussed

  12. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  13. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  14. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  15. Construction Project Leadership from the Perspective of Islam

    OpenAIRE

    MUHAMAD ROSDI SENAM; KHAIRUDDIN ABDUL RASHID; AZILA AHMAD SARKAWI; RAPIAH MOHD. ZAINI

    2014-01-01

    Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project managem...

  16. The LOFAR Known Pulsar Data Pipeline

    NARCIS (Netherlands)

    Alexov, A.; Hessels, J.W.T.; Mol, J.D.; Stappers, B.; van Leeuwen, J.

    2010-01-01

    Abstract: Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being

  17. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  18. Pipeline, utilities to spend $127 million on scada systems

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Spending for new or upgraded supervisory control and data acquisition (scada) systems and for additional remote-terminal units (RTUs) by North American pipelines and utilities will exceed $165 million through February 1996. New and updated scada systems will total 122 at a cost of more than $127 million; 143 RTU add-on projects will cost more than $38 million. Pipelines and combined utilities/pipelines will spend $89.5 million for 58 scada-system projects and $30.2 million for RTU add-on projects. Scada systems are computerized hardware and software systems that perform monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production-plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  19. Assessing health impacts of the Chad-Cameroon petroleum development and pipeline project: challenges and a way forward

    International Nuclear Information System (INIS)

    Utzinger, Juerg; Wyss, Kaspar; Moto, Daugla D.; Yemadji, N'Diekhor; Tanner, Marcel; Singer, Burton H.

    2005-01-01

    Health impact assessment (HIA) of projects, programmes and policies is increasingly recognized as a powerful methodology for mitigating negative health impacts and enhancing equitable and sustainable development, yet applications in the developing world are sparse. Here, we focus on a large infrastructure development in sub-Saharan Africa, namely the Chad-Cameroon petroleum development and pipeline project. We adapted a five-step process for HIA, consisting of (1) screening of project documents, (2) profiling of affected communities, (3) identifying priority health areas, predicting potential impacts, and proposing mitigation measures, (4) implementing interventions, and (5) monitoring and evaluation of health impacts. We found that project scoping was broad, including extensive environmental and social assessments. Innovative features of the project include the high degree of public-private partnerships, and the management of oil revenues for purposes of poverty reduction. The project also addressed occupational and public health issues, and developed and implemented measures to prevent or mitigate potential health impacts. However, there was a disproportionate emphasis on workers' health, particularly on the prevention/mitigation of construction-related injuries, sexually transmitted infections (STIs; mainly HIV/AIDS), and malaria. Health impacts among surrounding communities, and cumulative health impacts in the larger region were not considered in a comprehensive way. Concluding, there is a need for a more systemic approach to HIA and its incorporation within 'Equator Principles', which are increasingly adopted by the international financial community. This process would include clarification of corporate social responsibility beyond the project fence line in the mitigation of health problems at regional levels. Finally, we propose the establishment and running of a longitudinal demographic surveillance system, which--coupled with regular household surveys

  20. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  1. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  2. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  3. Tools and techniques for schedule's controlling: tracking system and control of Urucu-Manaus gas-pipeline construction, stretch B1

    Energy Technology Data Exchange (ETDEWEB)

    Zuany, Valdenise Marques; Dias, Jose Luiz Gomes [CONCREMAT Engenharia e Tecnologia S/A, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The goal is to show the monitoring systems and deadline control, using the PMBOK{sup R} project management tools, in the Construction and Assembly of the Coari-Manaus Gas-pipeline, stretch B1, which includes the cities of Coari, Codajas, Anori and Anama, in the state of Amazon, in the Northern Undertaking Implementation (IENOR), an Engineering division of the PETROBRAS System. This report presents the practical effects of the usage of three schedule control tools of the project: Performance Measurement, using the technique of the Earned Value Management (EVM), which integrates cost, schedule and physical progress of the enterprise to determine the variations of schedule and performance; Project Management Software, MSProject, which allows schedule's elaboration and makes the tracking of the planned dates possible (baseline) in relation to real dates and forecasts the trend level, the effects of changes in the project's schedule, demonstrating its utility as a schedule control tool; and Schedule Variance Analysis, which adopts practical data to reach the pessimistic, most likely and optimistic expectations. The implantation of these tools was based in the Work Breakdown Structure of the enterprise. The application of these three tools in the tracking and control of the enterprise demonstrates that, the use of information and techniques deriving from the planning and control can be an important support for project management and decision taking, comparing the results gotten in the implantation of the plan with its actual realization, defining, thus, the necessary corrective actions, generating learned lessons to use in future projects. (author)

  4. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  5. Study of stress-strain state of pipeline under permafrost conditions

    Science.gov (United States)

    Tarasenko, A. A.; Redutinskiy, M. N.; Chepur, P. V.; Gruchenkova, A. A.

    2018-05-01

    In this paper, the dependences of the stress-strain state and subsidence of pipelines on the dimensions of the subsidence zone are obtained for the sizes of pipes that have become most widespread during the construction of main oil pipelines (530x10, 820x12, 1020x12, 1020x14, 1020x16, 1220x14, 1220x16, 1220x18 mm). True values of stresses in the pipeline wall, as well as the exact location of maximum stresses for the interval of subsidence zones from 5 to 60 meters, are determined. For this purpose, the authors developed a finite element model of the pipeline that takes into account the actual interaction of the pipeline with the subgrade and allows calculating the SSS of the structure for a variable subsidence zone. Based on the obtained dependences for the underground laying of oil pipelines in permafrost areas, it is proposed to artificially limit the zone of possible subsidence by separation supports from the soil with higher building properties and physical-mechanical parameters. This technical solution would significantly reduce costs when constructing new oil pipelines in permafrost areas.

  6. Pipeline integrity evaluation of oil pipelines using free-swimming acoustic technology

    Energy Technology Data Exchange (ETDEWEB)

    Ariaratnam, Samuel T. [Arizona State University, Tempe, Arizona (United States); Chandrasekaran, Muthu [Pure Technologies Limited, Calgary, AB (Canada)

    2010-07-01

    In the United States, the Pipeline and Hazardous Materials Safety Administration (PHMSA) funded a joint academy-industry research project, which developed and refined a free-swimming tool called SmartBall. The tool swims through the pipeline and gives results at a much lower cost than current leak detection methods, and it can detect leaks as small as 0.03 gpm of oil. GPS-synchronized above-ground loggers capture acoustic signals and record the passage of the tool through the pipeline. The tool is spherical and smaller than the pipe, through which it rolls silently; it can overcome obstacles that could otherwise make a pipeline unpiggable. SmartBall uses the great potential of acoustic detection, because when a pressurized product leaks from a pipe, it produces a distinctive acoustic signal that travels through the product; at the same time, it overcomes the problem caused by the very limited range of this signal. This technology can prevent enormous economic consequences such as a 50,000-gallon gasoline spill that happened in 2003 between Tucson and Phoenix.

  7. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  8. Construction Project Leadership from the Perspective of Islam

    Directory of Open Access Journals (Sweden)

    MUHAMAD ROSDI SENAM

    2014-12-01

    Full Text Available Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project management literature calls for more project leadership research as leadership now is increasingly recognised as project success factor. Ethical dilemma and leadership crisis facing the project managers and business organisations reveals the shortcomings and inadequacies of the conventional non-Islamic leadership that is believed to be or that has not fully considered the religious, spiritual, moral and ethical dimensions. Examples of these theories of leadership are authentic leadership, servant leadership and ethical leadership. Therefore, recent trend from literature has implicitly suggested a new form of leadership for construction project manager which is spiritual, moral, values and ethical form of leadership. The uniqueness of Islam is that it does not separate religion and other aspects of human life activities. Construction and project activities are part of the whole economic and social transactions of a nation and thus it is part of Islam. Project management in particular leadership awaits divine intervention that is tied to God consciousness and accords with values and principles prescribed in the Quran and Sunnah. This research is intended to overcome the spiritual and religious shortcomings of the present leadership models by proposing an Islamic perspective of leadership for construction project manager.

  9. Pipeline rehabilitation planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil; Eyre, David [PENSPEN (United Kingdom)

    2005-07-01

    An operator faced with an onshore pipeline that has extensive damage must consider the need for rehabilitation, the sort of rehabilitation to be used, and the rehabilitation schedule. This paper will consider pipeline rehabilitation based on the authors' experiences from recent projects, and recommend a simple strategy for planning pipeline rehabilitation. It will also consider rehabilitation options: external re-coating; internal lining; internal painting; programmed repairs. The main focus will be external re-coating. Consideration will be given to rehabilitation coating types, including tape wraps, epoxy, and polyurethane. Finally it will discuss different options for scheduling the rehabilitation of corrosion damage including: the statistical comparison of signals from inspection pigs; statistical comparison of selected measurements from inspection pigs and other inspections; the use of corrosion rates estimated for the mechanisms and conditions; expert judgement. (author)

  10. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  11. Final environmental statement related to construction of Skagit Nuclear Power Project Units 1 and 2: (Docket Nos. 50-522 and 50-523)

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed action is the issuance of construction permits to the Pudget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Washington Public Power Supply System, for the construction of Skagit Nuclear Power Projects Units 1 and 2 (Docket Nos. 50-522 and 50-523) in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1982 and 1985, respectively. Each unit will employ a boiling-water nuclear reactor with a maximum expected thermal power level of 4100 MWt, which is considered in the assessments contained in this statement. At the 3800 MWt power level initially to be licensed, the net electrical capacity of each unit will be 1288 MWe. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser

  12. Living and working near pipelines : Landowner guide 2002

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The transportation of natural gas, oil and other commodities is effected by pipelines throughout most of the country. Safety in the vicinity of a pipeline is very important because damage to a pipeline could result in adverse conditions to public safety and/or the environment. Before digging, written approval must be obtained from the pipeline company. If a landowner is having difficulty negotiating an agreement with the pipeline company, they should call the National Energy Board. It is illegal to construct or excavate without authorization, and approval or denial of a request must be granted within 10 business days by the pipeline company. Three days are allowed to the pipeline company to locate its pipeline. A section dealing with pipeline right-of-way is included, as well as the safety zone and the restricted area. A 10-step checklist of safety tips assists the landowner in taking the appropriate measures in the vicinity of a pipeline. A brief overview of the responsibilities of the National Energy Board is provided, followed by a list of the main pipelines regulated by the National Energy Board. 2 figs

  13. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  14. Failure Assessment for the High-Strength Pipelines with Constant-Depth Circumferential Surface Cracks

    OpenAIRE

    X. Liu; Z. X. Lu; Y. Chen; Y. L. Sui; L. H. Dai

    2018-01-01

    In the oil and gas transportation system over long distance, application of high-strength pipeline steels can efficiently reduce construction and operation cost by increasing operational pressure and reducing the pipe wall thickness. Failure assessment is an important issue in the design, construction, and maintenance of the pipelines. The small circumferential surface cracks with constant depth in the welded pipelines are of practical interest. This work provides an engineering estimation pr...

  15. Modeling and monitoring of pipelines and networks advanced tools for automatic monitoring and supervision of pipelines

    CERN Document Server

    Torres, Lizeth

    2017-01-01

    This book focuses on the analysis and design of advanced techniques for on-line automatic computational monitoring of pipelines and pipe networks. It discusses how to improve the systems’ security considering mathematical models of the flow, historical flow rate and pressure data, with the main goal of reducing the number of sensors installed along a pipeline. The techniques presented in the book have been implemented in digital systems to enhance the abilities of the pipeline network’s operators in recognizing anomalies. A real leak scenario in a Mexican water pipeline is used to illustrate the benefits of these techniques in locating the position of a leak. Intended for an interdisciplinary audience, the book addresses researchers and professionals in the areas of mechanical, civil and control engineering. It covers topics on fluid mechanics, instrumentation, automatic control, signal processing, computing, construction and diagnostic technologies.

  16. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  17. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  18. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  19. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 2 of 2: Appendices

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level. This report contains appendices A and B. Appendix A contains notices of preparation/notices of intent and EIR/EIS scoping comments. Appendix B contains GeothermEx, Inc., analysis of Geothermal Reservoir Effects and Induced Seismicity

  20. Flooding simulation of hilly pipeline commisionning process

    Energy Technology Data Exchange (ETDEWEB)

    Nan, Zhang [China National Oil and Gas Exploration and Development Corporation and China University of Petroleum, Beijing (China); Jing, Gong [China University of Petroleum, Beijing (China); Baoli, Zhu [China National Oil and Gas Exploration and Development Corporation, Beijing (China); Lin, Zheng [CNPC Oil and Gas Control Center, Beijing (China)

    2010-07-01

    When the construction of a pipeline has been completed, the pipeline flooding is done as part of the pipeline commissioning process. This method consists of filling the empty pipe with water or oil. In a pipeline situated in hilly terrain, air entrapped in the fluid causes problems with the flooding process and it is necessary to discharge the accumulated air to address this issue. The aim of this paper is to provide a model for predicting the location and volume of air pockets in a pipeline. This model was developed based on the fundamentals of mass balance and momentum transfer in multiphase flow and was then applied to a pipeline in China and compared with the SCADA data. Results showed a good match between the model's predictions of hydraulic movement and the real data from SCADA. The two flow model developed can predict hydraulic movement during pipeline flooding in a hilly area and thus it can be used to predict water front location and air pocket movement in the pipe.

  1. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  2. Alliance Pipeline - The new kid on the block

    International Nuclear Information System (INIS)

    Edgeworth, A.

    1998-01-01

    Alliance Pipeline has taken on as its primary role to improve the competitive position of the Western Canadian Sedimentary Basin (WCSB), to increase market access for WCSB production, to provide a link for North American gas pricing, and to increase the total gas supply available across North America to serve current and future requirements. A summary of the company's partnership structure and construction program is presented. Also discussed were issues facing Canadian transporters and producers such as: pricing dynamics, gas supplies, regulatory change, competition, convergence, pipeline integrity, land issues, environmental issues, aboriginal issues, cost structures and taxes. The potential impact of the Alliance Pipeline coming on-stream in October 2000 on existing pipelines, possible future pipelines and on the existing supply scene is also assessed. tabs., figs

  3. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  4. Corporate social responsibility along pipelines: communities and corporations working together

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Edison D.R.; Lopes, Luciano E.; Danciguer, Lucilene; Macarini, Samuel; Souza, Maira de [Grupo de Aplicacao Interdisciplinar a Aprendizagem (GAIA), Campinas, SP (Brazil)

    2009-07-01

    In this paper we present GAIA's findings in three corporate social responsibility projects along pipelines owned by three Brazilian companies in gas, oil and mining sectors. The projects had as the main goal to improve the relationship with communities in the companies' direct influence areas. Clearly, the relationship with communities along pipelines is essential to prevent and reduce industrial hazards. The damage in pipelines due to agriculture, buildings, intentional perforations and traffic of heavy vehicles may cause fatal accidents, environmental and material losses. Such accidents have negative consequences with regard to economy, image and relationship with communities and environmental agencies. From communities' perspective, pipelines deteriorate their life quality due to risk of industrial hazards nearby their houses. The lack of proper information about the pipelines remarkably increases insecurity feelings and discourses against the companies among community leaders. The methodology developed by GAIA comprises companies' and communities' interests and encompasses nine stages. 1. Socio-environmental appraisal or inventory, mapping main risks, communities' needs and their leaders. 2. Communication plan, defining strategies, languages and communication vehicles for each stakeholder group. 3. Inter-institutional meetings to include other institutions in the program. 4. Launching seminar in partnership with local authorities, divulging companies' actions in the cities with pipelines. 5. Multiplier agents formation, enabling teachers, local leaders and government representatives to disseminate correct information about the pipelines such as their functioning, hazard prevention, maintenance actions, and restrictions of activities over the pipelines. 6. Formation on project management, enabling teachers, local leaders and government representatives to elaborate, fund raise and manage socio environmental projects aimed at

  5. The application of micro UAV in construction project

    Science.gov (United States)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  6. Bulletin 2005-12 : revised Alberta pipeline regulation issued

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-31

    A revised Pipeline Regulation has been issued and is currently available on the Alberta Energy and Utilities Board (EUB) website. Changes to the regulation reflect bothchanges in EUB regulatory policy and processes and technological improvements. Goals of the revision include improvements in overall pipeline performance, and the implementation of recommendations derived from the Public Safety and Sour Gas Committee concerning sour gas pipeline safety. The regulation was re-organized for greater clarity, and structured into 11 parts. Issues concerning the transition to the revised regulation were presented. The summary of notable administrative changes included clarifications of when a pipeline application is not required; when ABSA approval is required for steam lines; situations for which low-pressure natural gas lines must be licensed; and emergency response requirements. Technical clarifications include requirements for pipeline operations and maintenance manuals; composite materials; limitations on amounts of H{sub 2}S in polymeric pipe; pressure mismatches; approval for testing with gaseous media; venting of small volumes of raw gas; right-of-way surveillance; inspection of surface construction activities; annual corrosion evaluations; registering of pipelines and excavators in controlled areas with Alberta One-Call; ground disturbance training; restoration and signage maintenance on abandoned pipelines; sour service steel pipelines; unused pipelines and abandoned pipelines; and remediation of stub ends in operating pipelines.

  7. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  8. Considerations about the Urucu-Manaus gas pipeline design; Consideracoes sobre o projeto do gasoduto Urucu-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Villela, Claudio Henrique Lobianco G.; Correia, Luiz de Carvalho Dias [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The main purpose of this job is to present the characteristics that influenced the elaboration of the Urucu-Manaus Gas Pipeline Project and the difference between this pipeline and other pipelines already installed on the Amazon region. In this project were emphasized the aspects related to the route definition, mapping technologies that had not been utilized in our pipeline projects, the crossing of vast flooded areas, requiring specific studies, as well the minimization of the environment impacts, in this case the existence of animal species present only in this region. Other differential factor was the Rio Negro crossing, where the pipeline will be installed in the riverbed. The know-how attained with this project consolidates ever so the activity of building pipelines in tropical forest regions. (author)

  9. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  10. Archaeological Excavations on the BTC Pipeline, Azerbaijan

    Directory of Open Access Journals (Sweden)

    Paul Michael Taylor

    2011-06-01

    Full Text Available The archaeology and history of the Republic of Azerbaijan is not widely known in comparison with that of its neighbours. A recent summary of work in the Caucasus (Smith and Rubinson 2003 contained no specific references to results from Azerbaijan, although the studies were directly comparable and overlapped in period and geography. The reasons for this are many, perhaps the most influential is the presentation of material from Azerbaijan being confused with southern Azerbaijan in Iran in the wider academic audience and the use of the Cyrillic alphabet for reports written in the Azeri language over the past century. The Baku-Tbilisi-Ceyhan (BTC and South Caucasus Pipelines (SCP were constructed through Azerbaijan, Georgia and Turkey during the period 2003-5. BTC was built first from the Caspian Coast to the Georgian border during 2003 and 2004, while the SCP pipeline was built from the Georgian border towards the Caspian and parallel to the BTC in 2005. To investigate and mitigate the effects of this construction, a four year archaeological fieldwork programme (2001-2005 was carried out, followed by a further six-year post-excavation programme that ended in early 2011. This article draws on this extensive archaeological project that combines both the broad corpus of material known in Azerbaijan and new techniques introduced in the Republic for the first time and used on a range of sites that are of both national and international significance.

  11. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  12. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  13. Environmental impact assessment in the pipeline industry. Experiences with the UK north western ethylene pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Ryde, A.

    1997-12-31

    The north western ethylene pipeline is the final link between Shell`s oil and gas fields in the North Sea and its petrochemical complexes in Cheshire. The natural gas from which ethylene is obtained comes from the Brent and central fields in the North Sea. Environmental impacts are discussed in this paper covering topics as follow: Regulatory and legal aspects; environmental assessment during planning and design; environmental control during construction; environmental management during operation; environmental controls at sensitive sites on the north western ethylene pipeline: some examples. 11 refs., 2 figs.

  14. Environmental impact assessment in the pipeline industry. Experiences with the UK north western ethylene pipeline

    International Nuclear Information System (INIS)

    Ryder, A.

    1997-01-01

    The north western ethylene pipeline is the final link between Shell's oil and gas fields in the North Sea and its petrochemical complexes in Cheshire. The natural gas from which ethylene is obtained comes from the Brent and central fields in the North Sea. Environmental impacts are discussed in this paper covering topics as follow: Regulatory and legal aspects; environmental assessment during planning and design; environmental control during construction; environmental management during operation; environmental controls at sensitive sites on the north western ethylene pipeline: some examples. 11 refs., 2 figs

  15. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  16. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  17. Knowledge Management Practice on Construction Project ...

    African Journals Online (AJOL)

    Likewise, the results further indicated 19 benefits of KM practice for improving construction project performance and include: improve project quality, cost and time; practice and process improvement; encourage effective teamwork and innovation; improve the client satisfaction; boost productivity of employees and processes; ...

  18. Economic optimization in new distribution system construction

    International Nuclear Information System (INIS)

    Freese, J.

    1994-01-01

    The substantial capital investment and the long-term nature of extension projects make it necessary, in particular for local utilities, to intensively prepare their construction projects. Resulting from this context, the PC-program MAFIOSY for calculating and optimizing the economics of pipeline extension projects has been developed to facilitate the decision-making process and to ensure an optimum decision. The optimum structure of a distribution network to be designed for a new service area is defined using the four-phase method set out below: Situation Audit; Determination of Potential; Determination of Economic and Technical Parameters; Optimization. (orig.)

  19. The importance of an entomo-epidemiological monitoring in the construction of pipelines at the Amazon

    Energy Technology Data Exchange (ETDEWEB)

    Cruz, Elidianne da S.; Valgas, Luciana L.; Batista, Rita de Cassia G.; Agostini, Lucimara de; Pereira, Andreia Labrea; Freitas, Wanderleia Isabel P. de; Frade, Amadeu Farage [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    This work has as objective to evidence one of the consequences of most satisfactory results, talking about attendance to the legal requirements of health on a pipeline undertake at the Amazon: a positive result of index zero of malaria cases until the present days. This work, in its peak, reached the contingent of eight thousand workers lodged in rafts, boats, carps and jungle camps. To reach this index, a methodology of prevention through an entomo epidemiological control was adopted, recommended for the World-wide Organization of Health, as basic activity for malaria control in endemic areas, as in Amazon. The activities had consisted to identify the epidemiologic profile of each area, to elaborate procedures of vectorial control, to implant laboratories for analysis of malaria blades, to enable staff to accomplishment of vectorial control, to realize thermo nebulization and domestic spread and to sensitize the workers of prevention and control measures. Therefore, by means of accomplishment of these basic actions, it was possible to assure an integral, equitable and qualitative attendance providing a critical and conscientious vision of involved and the success of the procedures adopted by PETROBRAS, represented by ENGENHARIA/IENOR (Northern Undertake Implementation), unit responsible for the pipeline Urucu-Manaus Construction. (author)

  20. Overview of the long distance iron ore slurry pipeline from Anglo Ferrous Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Adarlan M.; Passos, Aline C.; Santos, Daniel; Orban, Eduardo M.; Lisboa, Helder D.; Goncalves, Nilton; Guimaraes, Robson C. [Anglo Ferrous Brazil, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The objective of this paper is to present an overview of the long distance iron ore slurry pipeline from Anglo Ferrous Brazil. Anglo Ferrous Brazil is a company of Anglo American plc that is one of the world's largest mining and natural resource company. Minas-Rio is a world class iron ore project which has been developed in Brazil aiming to produce 26.6 million tons per year of concentrate. The mine, concentrator and pump station 1 will be located in Conceicao do Mato Dentro, Minas Gerais state, and the terminal station will be located at Acu Port in Sao Joao da Barra, Rio de Janeiro state. The long distance iron ore slurry pipeline will be one of major differentials of Minas-Rio Project and its useful life was initially estimated in 20 years. The slurry pipeline has a total length of 525 kilometers and will be constructed from predominately 26 inches external diameter API 5L X70 pipes. From kilometer 314 to kilometer 480, 24 inches pipe will be installed to prevent slack flow downstream pump station 2. The pump station 1 is designed to provide the hydraulic head necessary to transport the concentrate iron ore slurry with 8 positive displacement pumps to pump station 2. The pump station 2, located 240 kilometers downstream pump station 1, is designed to operate with 10 positive displacement pumps. The valve station will be located at kilometer 347 and will be used to break the static head between pump station 2 and the terminal station during a slurry pipeline shutdown. (author)

  1. GIS (Geographic Information Systems) based automatic tool for selection of gas pipeline corridors

    Energy Technology Data Exchange (ETDEWEB)

    Matos, Denise F.; Menezes, Paulo Cesar P.; Paz, Luciana R.L.; Garcia, Katia C.; Cruz, Cristiane B.; Pires, Silvia H.M.; Damazio, Jorge M.; Medeiros, Alexandre M.

    2009-07-01

    This paper describes a methodology developed to build total accumulated surfaces in order to better select gas pipelines corridor alternatives. The methodology is based on the minimization of negative impacts and the use of Geographic Information Systems (GIS), allowing an automatic method of construction, evaluation and selection of alternatives, that will contribute to the decision making process. It is important to emphasize that this paper follows the assumptions presented on the research reports of a project sponsored by the Ministry of Mines and Energy (MME) and elaborated at the Electric Power Research Center (CEPEL), called 'Development of a Geographic Information System to Oil and Gas Sectors in Brazil', and also the studies d GTW Project (Gas to Wire). Gas pipelines, as for their linear characteristic, may cross a variety of habitats and settlements, increasing the complexity of their environmental management. Considering this reality, this paper presents a methodology that takes into account different environmental criteria (layers), according to the area impacted. From the synthesis of the criteria it is presented the total accumulated surface. It is showed an example of a hypothetical gas pipeline connection between two points using the total accumulated surface. To select the 'impact scores' of the features, the gas pipeline was considered as a linear feature, but the result is a region, formed by pixels, each pixel with an accumulated impact score lower than some arbitrary measure. This region is called 'corridor', and it is the final result obtained using the proposed methodology. (author)

  2. Review of environmental exposure concentrations of chemical warfare agent residues and associated the fish community risk following the construction and completion of the Nord Stream gas pipeline between Russia and Germany.

    Science.gov (United States)

    Sanderson, Hans; Fauser, Patrik; Rahbek, Malene; Larsen, Jørn Bo

    2014-08-30

    This paper compiles all the measured chemical warfare agent (CWA) concentrations found in relation to the Nord Stream pipeline work in Danish waters for the past 5 years. Sediment and biota sampling were performed along the pipeline route in four campaigns, prior to (in 2008 and 2010), during (in 2011) and after (in 2012) the construction work. No parent CWAs were detected in the sediments. Patchy residues of CWA degradation products of Adamsite, Clark I, phenyldichloroarsine, trichloroarsine and Lewisite II, were detected in a total of 29 of the 391 sediment samples collected and analyzed the past 5 years. The cumulative fish community risk quotient for the different locations, calculated as a sum of background and added risk, ranged between 0 and 0.017 suggesting a negligible acute CWA risk toward the fish community. The added risk from sediment disturbance in relation to construction of the pipelines represents less than 2% of the total risk in the areas with the highest calculated risk. The analyses of benthic infauna corroborate the finding of CWA related low risk across the years. There was no significant difference in CWA risk before (2008) and after the pipeline construction (2012). Copyright © 2014 Elsevier B.V. All rights reserved.

  3. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  4. Natural gas transport with the aid of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Volk, A

    1978-01-01

    After giving a brief explanation on the term natural gas and the chemical composition of natural gases of different origin, the natural gas supply in the FRG and in Western Europe is discussed. Other discussions are included on: (1) planning, construction, and operation of the pipelines; (2) the equipment for pressure increase and the telecommunication equipment which are urgently necessary for gas transport through pipelines; (3) the problem of safety both in connection with the supply and protection of man and material; and (4) problems of profitability of natural gas transport through pipelines.

  5. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  6. Causes of Low-Skilled Workers’ Performance in Construction Projects

    OpenAIRE

    Alhaji Ali Zannah; Aryani Ahmad Latiffi; Abdulazeez Umar Raji; Abdullahi Abba Waziri; Usman Mohammed 4

    2017-01-01

    Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achie...

  7. 42 CFR 137.362 - May construction project agreements be amended?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  8. Should the Nabucco pipeline project be shelved?

    International Nuclear Information System (INIS)

    Barysch, K.

    2010-05-01

    It is easy to be pessimistic about the prospects of Nabucco, a pipeline designed to bring Caspian and possibly Middle Eastern gas to the EU. The financing is not yet secure, European gas demand is down, and the question of where Nabucco's gas will come from is open. Russia, meanwhile, is pushing hard for its rival South Stream pipeline. Nabucco would be good for the EU in various ways. It would make Central and East European countries a lot less dependent on Gazprom and increase the energy security of the EU as a whole. It could help reduce intra-EU divisions over Russia. It would underpin stronger ties between the EU and potential supplier countries such as Azerbaijan and Turkmenistan. It could help improve EU-Turkey relations. Many of the benefits that Nabucco would bring do not accrue to the companies that are trying to build it or the banks that lend the money for it. Therefore, the EU and its governments should back Nabucco more strongly, both politically and financially.

  9. Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project

    International Nuclear Information System (INIS)

    Wu, Wei-Shing; Yang, Chen-Feng; Chang, Jung-Chuan; Château, Pierre-Alexandre; Chang, Yang-Chi

    2015-01-01

    The sound development of marine resource usage relies on a strong maritime engineering industry. The perilous marine environment poses the highest risk to all maritime work. It is therefore imperative to reduce the risk associated with maritime work by using some analytical methods other than engineering techniques. This study addresses this issue by using an integrated interpretive structure modeling (ISM) and Bayesian network (BN) approach in a risk assessment context. Mitigating or managing maritime risk relies primarily on domain expert experience and knowledge. ISM can be used to incorporate expert knowledge in a systematic manner and helps to impose order and direction on complex relationships that exist among system elements. Working with experts, this research used ISM to clearly specify an engineering risk factor relationship represented by a cause–effect diagram, which forms the structure of the BN. The expert subjective judgments were further transformed into a prior and conditional probability set to be embedded in the BN. We used the BN to evaluate the risks of two offshore pipeline projects in Taiwan. The results indicated that the BN can provide explicit risk information to support better project management. - Highlights: • We adopt an integrated method for risk assessment of offshore pipeline projects. • We conduct semi-structural interview with the experts for risk factor identification. • Interpretive structural modeling helps to form the digraph of Bayesian network (BN) • We perform the risk analysis with the experts by building a BN. • Risk evaluations of two case studies using the BN show effectiveness of the methods

  10. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  11. 78 FR 29201 - Notice of Availability of Finding of No Significant Impact for the Proposed Vantage Pipeline US...

    Science.gov (United States)

    2013-05-17

    ... Impact for the Proposed Vantage Pipeline US LP Ethane Pipeline Project SUMMARY: The purpose of this... Impact on the proposed Vantage Pipeline US LP Ethane Pipeline Project. Under E.O. 13337, the Secretary of... petroleum, petroleum products, or other non-gaseous fuels to or from a foreign country. Vantage Pipeline US...

  12. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  13. Derrick Hindery. From Enron to Evo. Pipeline Politics, Global Environmentalism, and Indigenous Rights in Bolivia

    Directory of Open Access Journals (Sweden)

    Ignacio Arana

    2014-11-01

    Full Text Available From Enron to Evo is a long-term study of Enron and Shell’s construction of the Cuiabá pipeline in eastern Bolivia. The pipeline goes through the middle of the Chiquitano forest and affects a population of about 8,000. The project also has a negative impact on four critical ecoregions; the Gran Chaco and Cerrado, which are a mixture of grasslands and scattered trees, the Chiquitano dry forest, and the Pantanal wetlands. The Cuiabá pipeline has been highly contested by the thirty-four Chiquitano and two Ayoreo communities that live in the area. After years of field research, extensive interviews and document analyses, Dr. Hindery manages to expose the murky ways in which the hydrocarbon industry works in Bolivia. This is an industry where the powerful –mainly multinational oil companies and the Bolivian government– abuse the ecoregion and the indigenous populations that live on it.

  14. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  15. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  16. Permanent cathodic protection monitoring systems for offshore pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Britton, Jim [Deepwater Corrosion Services Inc., Houston, TX (United States)

    2009-07-01

    Historically offshore pipeline cathodic protection monitoring has relied on the use of portable survey techniques. This has typically relied on ROV assisted or surface deployed survey methods. These methods have been shown to have technical as well as economic shortcomings, this is particularly true of buried offshore pipelines where accuracy is always questionable. As more focus is being placed on offshore pipeline integrity, it was time for a new method to emerge. The technology discussed involves the retro-placement of permanent clamp-on monitors onto the pipeline which can measure pipeline to seawater potential as well as current density. The sensors can be interrogated locally using light powered subsea voltage readouts. Application of the technology can be either during pipeline construction, during installation of life extension CP systems, or during routine subsea pipeline interventions. The new method eliminates the need for long cables or expensive acoustic or modulated data transfer and provides all the information required to fully verify CP system performance, thus eliminating the need for expensive close-interval surveys. Some deployment case histories will be presented along with feasibility of application on deep water pipelines and comparative economics. (author)

  17. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  18. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  19. Technology assessment of long distance liquid natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    This document contains phases 7, 8, and 9 of a review on the technology assessment of long distance liquefied natural gas (LNG) pipelines. Phase 7 contains 6 papers describing novel applications for LNG pipelines. Phase 8 contains a summary of material relating to cold utilization and rural service. Phase 9 presents a listing of materials and equipment used to construct an LNG pipeline. Separate abstracts for each phase of the study have been prepared for inclusion in the Energy Data Base. (DMC)

  20. Improved FTA methodology and application to subsea pipeline reliability design.

    Science.gov (United States)

    Lin, Jing; Yuan, Yongbo; Zhang, Mingyuan

    2014-01-01

    An innovative logic tree, Failure Expansion Tree (FET), is proposed in this paper, which improves on traditional Fault Tree Analysis (FTA). It describes a different thinking approach for risk factor identification and reliability risk assessment. By providing a more comprehensive and objective methodology, the rather subjective nature of FTA node discovery is significantly reduced and the resulting mathematical calculations for quantitative analysis are greatly simplified. Applied to the Useful Life phase of a subsea pipeline engineering project, the approach provides a more structured analysis by constructing a tree following the laws of physics and geometry. Resulting improvements are summarized in comparison table form.

  1. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  2. Instrumented Pipeline Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  3. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  4. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  5. Useful effectiveness of plastic pipes for gas pipelines operating at low pressure

    Energy Technology Data Exchange (ETDEWEB)

    Zayutsev, K I

    1976-06-01

    Because a significant portion of the feeder lines in the Soviet union operate at relatively low pressures up to 75 to 150 psi, it is economically feasible to replace the conventional pipeline material (steel) with plastic. Cost savings result from lower material costs and ease of laying plastic pipe. Because of stiffness and corrosion requirements, the steel pipe used for these low-pressure pipelines is much thicker than needed to withstand the pressure used. Data are tabulated on the comparative costs and manpower requirements for the construction of 1 km of steel, polyvinyl chloride, and polyethylene gas pipelines ranging in diameter from 3 to 14 in. Generally, the plastic pipelines required 15 to 30% less man-days and were 20 to 35% lower in cost to build. The plastic pipelines can operate at 150 to 175 psi pressure and at temperatures up to 100 to 140/sup 0/F. In research conducted at VNIIST (All-Union Research Institute for the Construction of Trunk Pipelines) on plastic pipelines, a 2.5-mile test section has been operating successfully for 2 years, and new techniques and equipment for joining plastic pipe up to 25-in. diameter are being developed.

  6. Pipeline welding with Flux Cored and Metal Cored Wire; Soldagem de dutos com processos Arame Tubular e de Alma Metalica

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Ubirajara Pereira da [ITW Soldagem Brasil Miller-Hobart, Sao Paulo, SP (Brazil)

    2003-07-01

    Different welding process like SMAW, Semi-Automatic FCAW Gas-shielded and Self-shielded and Mechanized GMAW-MAG with Solid Wire are suggested to weld Transmission Pipelines. Presently, the largest extensions of Transmission Pipelines under construction, are in China like Lines West-East, Zong-Wu, Shan-Jing Fuxian and some others, totalizing about 8.000 km, and all using Semi-Automatic Self Shielded Flux Cored Arc Welding Process. Also, several papers and magazines that covers Transmission Pipelines Welding, not frequently mention Operational aspects of the process and some other variables like environment and site geography. This presentation intends to cover some of the Operational aspects of the Flux Cored Arc Welding and GMAW-Metal Cored in order to give sufficient information for Construction, Engineering, Projects e Contractors so they can evaluate these Process against the SMAW or even Mechanized Systems, considering the Operation Factor, Efficiency and Deposition Rate. We will not cover operational details of the GMAW Mechanized Systems but only suggest that be evaluated the possibility to replace the GMAW-Solid Wire by the GMAW-Metal Cored Wire. (author)

  7. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  8. Research on prognostics and health management of underground pipeline

    Science.gov (United States)

    Zhang, Guangdi; Yang, Meng; Yang, Fan; Ni, Na

    2018-04-01

    With the development of the city, the construction of the underground pipeline is more and more complex, which has relation to the safety and normal operation of the city, known as "the lifeline of the city". First of all, this paper introduces the principle of PHM (Prognostics and Health Management) technology, then proposed for fault diagnosis, prognostics and health management in view of underground pipeline, make a diagnosis and prognostics for the faults appearing in the operation of the underground pipeline, and then make a health assessment of the whole underground pipe network in order to ensure the operation of the pipeline safely. Finally, summarize and prospect the future research direction.

  9. Geo-environmental mapping tool applied to pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Karina de S.; Calle, Jose A.; Gil, Euzebio J. [Geomecanica S/A Tecnologia de Solo Rochas e Materiais, Rio de Janeiro, RJ (Brazil); Sare, Alexandre R. [Geomechanics International Inc., Houston, TX (United States); Soares, Ana Cecilia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The Geo-Environmental Mapping is an improvement of the Geological-Geotechnical Mapping used for basic pipeline designs. The main purpose is to assembly the environmental, geotechnical and geological concepts in a methodological tool capable to predict constrains and reduce the pipeline impact to the environment. The Geo-Environmental mapping was built to stress the influence of soil/structure interaction, related to the physical effect that comes from the contact between structures and soil or rock. A Geological-Geotechnical-Environmental strip (chart) was presented to emphasize the pipeline operational constrains and its influence to the environment. The mapping was developed to clearly show the occurrence and properties of geological materials divided into geotechnical domain units (zones). The strips present construction natural properties, such as: excavability, stability of the excavation and soil re-use capability. Also, the environmental constrains were added to the geological-geotechnical mapping. The Geo-Environmental Mapping model helps the planning of the geotechnical and environmental inquiries to be carried out during executive design, the discussion on the types of equipment to be employed during construction and the analysis of the geological risks and environmental impacts to be faced during the built of the pipeline. (author)

  10. Technical assistance to the manufacture, construction and assembly of Osorio-Canoas oil pipeline flow pumps

    Energy Technology Data Exchange (ETDEWEB)

    Menezes, Kellson Takenaka; Rangel Junior, Joilson Rangel; Costa, Jose Coelho [Petroleo Brasileiro S/A (PETROBRAS), Rio de Janeiro, RJ (Brazil)], E-mails: kellson.telsan@petrobras.com.br, joilson_jr@petrobras.com.br, jccoelho.telsan@petrobras.com.br

    2010-07-01

    This paper reports the experiences acquired through the modifications and improvements implemented in the manufacture, construction and assembly of the oil flow centrifugal pumps of the Osorio-Canoas Oil Pipeline (OSCAN 22''), located in Rio Grande do Sul. The OSCAN 22'' pumping capacity expansion was conceived aiming at meeting the Alberto Pasqualini Refinery (REFAP) processing increase project from 20,000 m{sup 3}/day to 30,000 m{sup 3}/day, besides changing the product profile from processed product to national high viscosity national oils. Due to this reason, a new pump park at the Almirante Soares Dutra Terminal (TEDUT) and a new intermediate pump station named Estacao de Santo Antonio da Patrulha (ESPAT) have been erected. Thus, the oil received by a tanker and stored at TEDUT was now pumped to ESPAT and then to REFAP through a 97 km long and 22 inch diameter oil pipeline named OSCAN 22''. In order to get such oil flow done, 03 new main pumps have been installed at TEDUT, one of them being a stand-by one, and other 03 pumps at ESPAT, one of them being also a stand-by one. During the startup of TEDUT's pumps, high vibration levels were observed in the rotors and in the equipment structures. The values defined by the manufacturer for equipment alarm and shutdown were, respectively, 50.0 {mu}m and 75.0 {mu}m, measured on the pump rotors in the bearing region. However, the global vibration levels of the TEDUT's pumps reached 110.0 {mu}m during the startup attended by the manufacturers. The equipment warranty period started after that, and a detailed activity planning was drawn up with the purpose of keeping TEDUT running with the new pumps at the lowest possible operational risk and avoiding a production reduction at REFAP. Simultaneously, various actions were taken in order to identify the vibration sources and reduce its intensity to the lowest possible values. After equipment modifications, median vibration values at 15

  11. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  12. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  13. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  14. Expansive Learning in Construction Projects - a Contradiction in terms?

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Nissen, Søren Bülow; Beck, Frederikke

    2016-01-01

    This research is a preliminary study performed as part of a primary research into expansive learning in interorganizational network set up to solve a construction project. The construction industry has long had issues about productivity, which can be an indication of lack of learning. A case study...... acquisition and participation but not by expansive learning. The construction industry needs to accept that the learning generated from projects will be limited to learning by acquisition and participation. The interorganizational network cannot facilitate expansive learning while working on object......-fixed projects. Research in construction management fails to generate and document knowledge because of the limitations of case studies....

  15. GASVOL 18'' gas pipeline - risk based inspection study

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernoey, Ola H.; Etterdal, Birger A. [Det Norske Veritas (DNV), Oslo (Norway); Guarize, Rosimar; Oliveira, Luiz F.S. [Det Norske Veritas (DNV) (Brazil); Faertes, Denise; Dias, Ricardo [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes a risk based approach and inspection planning as part of the Pipeline Integrity Management (PIM) system for the 95.5 km long 18'' GASVOL gas pipeline in the South eastern region of Brazil transporting circa 5 000 000 m3 dry gas per day. Pipeline systems can be subject to several degradation mechanisms and inspection and monitoring are used to ensure system integrity. Modern pipeline regulations and codes are normally based on a core safety or risk philosophy. The detailed design requirements presented in design codes are practical interpretations established so as to fulfill these core objectives. A given pipeline, designed, constructed and installed according to a pipeline code is therefore the realization of a structure, which, along its whole length, meets the applicable safety objectives of that code. The main objective of Pipeline Integrity Management (PIM) is to control and document the integrity of the pipeline for its whole service life, and to do this in a cost-effective manner. DNV has a specific approach to RBI planning, starting with an initial qualitative assessment where pipelines and damage type are ranked according to risk and potential risk reduction by an inspection and then carried forward to a quantitative detailed assessment where the level of complexity and accuracy can vary based on availability of information and owner needs. Detailed assessment requires significant effort in data gathering. The findings are dependent upon the accuracy of the inspection data, and on DNV's interpretation of the pipeline reference system and simplifications in the inspection data reported. The following specific failure mechanisms were investigated: internal corrosion, external corrosion, third party interference, landslides and black powder. RBI planning, in general words, is a 'living process'. In order to optimize future inspections, it is essential that the analyses utilize the most recent information regarding

  16. Exploitation of cloud computing in management of construction projects in Slovakia

    Directory of Open Access Journals (Sweden)

    Mandičák Tomáš

    2016-12-01

    Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.

  17. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  18. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Science.gov (United States)

    Zhuang, Yuan; Li, Yang; Su, Wei

    2016-01-01

    Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  19. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  20. Social and environmental assessment: a preliminary data base on population and territory in the undertakings pipelines: a natural gas pipeline GASBEL II; Avaliacao socioambiental - base de dados preliminar sobre populacao e territorio em empreendimentos de dutos - estudo de caso: avaliacao socioambiental GASBEL II

    Energy Technology Data Exchange (ETDEWEB)

    Bartolini, Marcia; Bach, Vanessa [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Ismerio, Marcia [Pallos Consultorias, Rio de Janeiro, RJ (Brazil); Leal, Edna Mara [Camargo Correa Engenharia (Brazil)

    2008-07-01

    The social environmental assessment consists in an instrument of planning which principal objective is to know the social ambient that will be changed by the PETROBRAS' pipe undertakings, that are planning to be implemented and will be analyzed by the licensers environmental organs. When pipeline projects are planned, their route cross some regions and ecological sensitive areas, therefore, the attitude of consider the social environmental aspects at the planning stage through the use of valuation instruments, anticipating, the potential social and environmental impacts, assumes more importance in integrating management of these undertakings. This presentation has the main objective to stand out the relevance of the social environmental assessment realization as preliminary knowledge base to the undertakings, since the research results developed represents a support of information about the regions where the undertakings install themselves in distinct stages: environmental permits, assembly and construction and operating. The social environmental assessment of the project named GASBEL II is presented as a case study once it allow to observe a gas pipeline transport project to be implemented at different regions and areas. The Pipeline will cross two different federal states, where the local research boarded many communities with different ways and conditions of life, territory use, cultural expressions and other aspects. (author)

  1. Building a pipeline of talent for operating radio observatories

    Science.gov (United States)

    Wingate, Lory M.

    2016-07-01

    The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  2. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  3. Static equilibrium analysis for pipeline protection design in Iran LNG port

    Energy Technology Data Exchange (ETDEWEB)

    Abdollahi, A.S.; Vakili, R. [Iran Univ. of Science and Technology, Tehran, (Iran, Islamic Republic of); Alielahi, H. [Islamic Azad Univ., Zanjan (Iran, Islamic Republic of)

    2010-07-01

    This paper discussed the protection design for an intake seawater pipeline that will be built for a liquefied natural gas (LNG) project. The limit equilibrium approach was used to estimate the geometry of the protection layer with respect to the holding capacity of the drag anchors in cohesionless soil, incorporating a more realistic 3-dimensional failure pattern in the soil as well as the force acting on the back of the fluke. The study addressed all technical and executive points related to the pipeline construction, including anchor type, ship load, geotechnical properties of the protected zone and the underlying seabed, and the procedure to calculate the geometry of the protection layer. The protection layer must account for the complexity of interactions among anchor, anchor chain, sea bed, and rock armour. This analytical method provided logical results more quickly and at a lower cost than model testing. 14 refs., 3 tabs., 9 figs.

  4. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  5. Measuring the effects of using ICT/BIM in construction projects

    DEFF Research Database (Denmark)

    Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan

    2016-01-01

    This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects....... Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction...... projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case...

  6. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  7. Ranking of delay factors in construction projects after Egyptian revolution

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Time is one of the major considerations throughout project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Time delay is a very frequent phenomenon and is almost associated with nearly all constructing projects. However, little effort has been made to curtail the phenomenon, this research work attempts to identify, investigate, and rank factors perceived to affect delays in the Egyptian construction projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, researcher invited practitioners and experts, comprising a statistically representative sample to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of delay factors were identified in construction projects. Totally, ninety-nine (99 factors were short-listed to be made part of the questionnaire survey and were identified and categorized into nine (9 major categories. The survey was conducted with experts and representatives from private, public, and local general construction firms. The data were analyzed using Relative Importance Index (RII, ranking and simple percentages. Ranking of factors and categories was demonstrated according to their importance level on delay, especially after 25/1/2011 (Egyptian revolution. According to the case study results, the most contributing factors and categories (those need attention to delays were discussed, and some recommendations were made in order to minimize and control delays in construction projects. Also, this paper can serve as a guide for all construction parties with effective management in construction projects to achieve a competitive level of quality and a time effective project.

  8. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  9. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  10. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  11. Proceedings of the Canadian Institute conference on maximizing oil sands growth : improving transportation logistics, labour supply and pipeline availability

    International Nuclear Information System (INIS)

    2005-01-01

    This conference focused on the development of a transportation infrastructure to accommodate oil sands growth, with particular reference to building a pipeline infrastructure to meet the delivery and supply requirements of oil sands producers. The need for transmission system upgrades and additions to meet the electric power requirements of the oil sands industry was also discussed. The transportation options and new proposed pipeline construction projects that will alleviate the current transportation challenges in the oil sands region were identified. These include the implementation of new infrastructure strategies based on current pipeline availability, Kyoto requirements and downstream market demands. The impact of labour shortages on the oil sands industry was reviewed along with solutions to prevent and overcome these shortages. The conference featured 15 presentations, of which 3 have been catalogued separately for inclusion in this database. tabs., figs

  12. Creativity in action: elegantly simple idea puts firm on international pipeline map

    Energy Technology Data Exchange (ETDEWEB)

    Podlubny, J.

    2002-05-06

    A saddle bag-like device, a relatively simple invention to carry weights to hold pipelines stable in wet environments, has catapulted a small Athabasca, Alberta, company to international prominence. The saddle bag is made of 100 per cent non-biodegradable material called geotextile, commonly referred to as road matting. The bags have a life expectancy of 100 years or more, easily outlasting the pipe they protect from shifting. Weighting systems are used on pipelines to achieve the negative buoyancy required to prevent them from floating out of wet ground. They are essential in wide swats of the northern areas where the oil and gas industry operates. The saddle bags replace the traditional concrete weights which have been either bolted down or set on top of the pipe. They were bulky and hard to transport, as well as difficult to place on the pipe. In contrast, the saddle bags are easy to transport and easy to install. Indeed, the production process is portable, so that the weighted saddle bags can be made at the site of the pipeline construction job involved. This makes it easier to do pipeline weighting jobs in cold weather, at remote locations or in spots where considerable travel time is involved in completing projects. Saddle Tech has recently joined forces with the giant in the weighting system world from the United States, CRC-Evans. The U.S. firm is marketing the bags under a trademarked name 'the saddle bag'. The product being used on projects in California, as well as on almost 90 per cent of wetlands pipeline work in Alberta and British Columbia. Production was 17,000 bags in the first year of operation. So far this season, more than 40,000 bags have been made and distributed throughout North America. Plans are afoot to expand and convert the production facility to an automated operation, running 24 hours a day.

  13. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  14. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  15. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  16. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  17. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Directory of Open Access Journals (Sweden)

    Yuan Zhuang

    Full Text Available Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  18. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  19. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  20. 75 FR 14243 - Pipeline Safety: Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and...

    Science.gov (United States)

    2010-03-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No..., and Welding Practices of Large Diameter Line Pipe AGENCY: Pipeline and Hazardous Materials Safety... bulletin to notify owners and operators of recently constructed large diameter natural gas pipeline and...

  1. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  2. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  3. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  4. PGPB's pipeline integrity management system

    Energy Technology Data Exchange (ETDEWEB)

    Urencio, Claudio; Sanchez, Luis; Moreno, Carlos [PGPB - Pemex Gas y Petroquimica Basica (Mexico)

    2005-07-01

    Pemex Gas has 12,134 km of natural gas transmission pipelines, 1,835 Km for LPG and 1,216 Km for basic petrochemicals. The must part of this infrastructure was built in the 70's and reaching their 35 years of operating life. To manage the integrity of the three systems, Pemex Gas has a portfolio of technological tools. This tools allow the Company to improves the decision taking, align the budget with their strategic goals, achieve efficient asset utilization, and increase the value generation. The process of integrity management starts with the risk evaluation on assets, with the use of a software called IAP (Integrity Assessment Program). This information is integrated to the SIIA (Assets Identification System). The results of both software are used to the construction of the Risk Atlas, which identifies graphically each pipeline segment, with their related risk and factors that influence their behavior. The Risk Atlas gives us information about the consequences to the people, environment and facilities, so we can design customized plans to prevent or mitigate emergencies. Finally a detailed analysis of the resulting information and scenarios simulations help us to determine the best investment projects that will minimize the risk through all our assets. (author)

  5. Black powder removal in a Mexico gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, John R. [TDW Services, Inc., New Castle, DE (United States); Drysdale, Colin; Warterfield, Bob D. [T.D.Williamson, Inc., Tulsa, OK (United States)

    2008-07-01

    This paper focuses on the cleaning methodology and operational constrains involved with the removal of black powder in a high pressure natural gas transmission pipeline. In this case, the accumulation of black powder along the pipeline system over the seven year period since it was put into service was creating significant problems in the areas of maintenance, customer relations, and cost to the pipeline operator due to clogging of filters, reduced gas flow, and penalties as result of non-compliant delivery contracts. The pipeline cleaning project consisted of running cleaning pigs or scrappers with batches of cleaning solution through each section of the pipeline while dealing with such factors as three (3) pipeline section lengths in excess of 160 kms (100 miles), gas flow velocity fluctuations, shutdowns, and gas delivery schedule requirements. The cleaning program for the entire pipeline system included the use of chemical and diesel based cleaning solution, running multiple cleaning pigs, liquid injection and separation system, mobile storage tanks, various equipment and personnel for logistical support. Upon completion of the cleaning program, the level of black powder and other solids in all pipeline sections was reduced to approximately 0.5% liquid/solid ratio and the pipeline system returned to normal optimum operation. (author.

  6. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Science.gov (United States)

    2011-02-01

    ... Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed Eagle Mountain Pumped... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments...

  7. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  8. Facilitating major additions to gas pipeline capacity: innovative approaches to financing, contracting, and regulation

    International Nuclear Information System (INIS)

    Schlesinger, B.; George, R.

    1997-01-01

    The North American gas pipeline industry is in the process of changing from a highly regulated merchant business to a less-regulated, more competitive, transportation industry. This has changed the risk profiles of many companies. This study examined various innovative approaches to successfully financing major pipeline projects emphasizing pipeline capacity financing, contractual terms between shippers and pipelines, and regulatory developments. Besides suggesting options to enhance prospects for financing major pipeline expansion projects, the study also aimed at creating a better understanding of the regulatory market and commercial changes in the pipeline industry and their financing implications. The study also includes a review of the evolution in gas markets and a record of consultations with lenders, producers, marketers and users. Innovative financing, contracting and regulatory solutions are identified and assessed. 25 refs., 17 tabs., 16 figs

  9. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  10. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  11. Pipeline river crossing studies; Estudos de travessias de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Leal, Marcos de Castro; Stasiak, Luciano; Silva, Alessandra de Barros e [ESTEIO Engenharia e Aerolevantamentos S.A., Curitiba, PR (Brazil)

    2005-07-01

    This work has for objective to guide the execution of study of pipelines crossings under courses of water, channels, flooded areas and reservoirs. The study seeks the minimal risks to the pipelines, be them anthropics, geotechnics, hydraulics or environmental, as in the implantation phase as of operation. It also seeks to determine which is the best constructive method for the crossing in question. (author)

  12. Out on the tar sands mainline : mapping Enbridge's web of pipelines : a corporate profile of pipeline company Enbridge

    Energy Technology Data Exchange (ETDEWEB)

    Girard, R.; Davis, T.R. [Polaris Institute, Ottawa, ON (Canada)

    2010-05-15

    This document described Enbridge's operations, economic situation, political connections, and its social and environmental track record. It explored the social cost of operating refineries and pipelines in First Nations communities and the environment. It also raised concerns regarding future plans to open up Asian markets to oil sand crude via the Gateway pipeline. This profile included specific details on recurring pipeline leaks that have caused environmental damage; the ongoing expropriation of First Nations land; widespread political lobbying and influence in Canada and the United States; and interference in local community decision-making through financial contributions and projects. refs., tabs., figs.

  13. Structural reliability analysis applied to pipeline risk analysis

    Energy Technology Data Exchange (ETDEWEB)

    Gardiner, M. [GL Industrial Services, Loughborough (United Kingdom); Mendes, Renato F.; Donato, Guilherme V.P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Quantitative Risk Assessment (QRA) of pipelines requires two main components to be provided. These are models of the consequences that follow from some loss of containment incident, and models for the likelihood of such incidents occurring. This paper describes how PETROBRAS have used Structural Reliability Analysis for the second of these, to provide pipeline- and location-specific predictions of failure frequency for a number of pipeline assets. This paper presents an approach to estimating failure rates for liquid and gas pipelines, using Structural Reliability Analysis (SRA) to analyze the credible basic mechanisms of failure such as corrosion and mechanical damage. SRA is a probabilistic limit state method: for a given failure mechanism it quantifies the uncertainty in parameters to mathematical models of the load-resistance state of a structure and then evaluates the probability of load exceeding resistance. SRA can be used to benefit the pipeline risk management process by optimizing in-line inspection schedules, and as part of the design process for new construction in pipeline rights of way that already contain multiple lines. A case study is presented to show how the SRA approach has recently been used on PETROBRAS pipelines and the benefits obtained from it. (author)

  14. Upgrade of pipelines operated in a Polish conditions in accordance with European Standards

    International Nuclear Information System (INIS)

    Witek, M.

    2007-01-01

    This paper presents some aspects of changing polish technical requirements concerning high pressure gas pipelines in accordance with European Norm 1594 '' Gas supply system. Pipelines with maximum operating pressure over 16 bar. Functional requirements ''. An additional class location of the steel pipelines was analyzed and supported by the results on numerous pipeline cases in Poland. Minimum distances between pipelines and buildings are given as a proposal to upgrading polish technical law in the area of the gas grid. Special attention in analysis was given to the polish existing high pressure gas network and calculation examples of existing types of steel used in pipeline construction in the past. (author)

  15. Delay factors in failed construction projects in southwestern Nigeria ...

    African Journals Online (AJOL)

    This study was carried out with a view to showing the contribution of delay factors in the overall consideration of failed construction projects in south western Nigeria. This is considered necessary because the traditional view of construction project failure as consisting mainly of structural or functional failures tends to excuse ...

  16. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    , construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO2 per year as an integral component of commercial operations.

  17. Environmental assessment on PETROBRAS pipeline projects: case study of Cacimbas-Catu gas pipeline; Engenharia de avaliacao ambiental no processo de concepcao de projetos de dutos da PETROBRAS - estudo de caso do Gasoduto Cacimbas (ES) - Catu (BA)

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Wilson Jose de; Pereira, Junior, Edson R; Fonseca, Renata A. Almeida; Rocha, Marcelo de Andrade; Soares, Luis Felipe [PETROBRAS Engenharia, RJ (Brazil). Engenharia de Avaliacao Ambiental

    2005-07-01

    The environmental assessment process is one of the most important phases in the implementation of pipeline projects. For that reason, new technologies and work procedures are used to perform the environmental assessment of areas where pipeways will be implemented. Since the quality of environmental assessment studies influences the social acceptance of projects and, consequently, the time required to obtain the environmental permits, PETROBRAS (Engenharia/IETEG/ETEG/EAMB) applies advanced technological tools to acquire remote sensing data (conventional / digital aero-surveys and satellite images), as well as software for digital image processing and integration and spatial analysis of information. Information about the physical, biological and socioeconomic environments are further verified and complemented through field trips using helicopters. This process makes it possible to identify environmentally favorable corridors to develop guidelines for the implementation of the pipeline, assuring its environmental feasibility, and produces relevant data to support the Environmental Impact Assessment Study, the Environmental Impact Assessment Report and the Risk Analysis Study. As an example of the application of this methodology, this paper presents results of the assessment of the Cacimbas / Catu gas pipeline, which is currently being permitted and is planned to be implemented in areas of high environmental complexity. (author)

  18. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  19. The influence of the internal microbiome on the materials used for construction of the transmission natural gas pipelines in the Lodz Province

    Science.gov (United States)

    Staniszewska, Agnieszka; Jastrzębska, Magdalena; Ziemiński, Krzysztof

    2017-10-01

    This paper presents investigation results of the influence of gas microbes on the biocorrosion rate of the materials used for gas pipelines construction in the Lodz Province. Samples of two types of carbon steel and cast iron were stored in the laboratory pipeline model reflecting the real conditions of working natural gas pipelines were. In the next step the influence of cathodic protection with parameters recommended for protection of underground structures was tested. Analyses of biological corrosion products generated on the test surface were carried out using a scanning electron microscope with an X-ray analyzer. The level of ATP was measured to confirm presence of the adsorbed microorganisms on the observed structures. Corrosion rates were determined by gravimetric methods. In the course of the study it was revealed that the rate of biocorrosion of steel is lower than that for cast iron. Our results also proved that the weight corrosion rate depends on the number of adhered microorganisms. In addition, it has been found that application of the carbon steel cathodic protection decreases its weight corrosion rate. The information obtained will help to increase the knowledge on the rate of biological corrosion causing losses/pits inside gas pipline.

  20. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  1. The S-curve for forecasting waste generation in construction projects.

    Science.gov (United States)

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  3. Mechanical properties of steel for construction of gas transfer pipelines and their modification resulting from expanding of gas pipelines during hydraulic pressure testing

    International Nuclear Information System (INIS)

    Kopczynski, A.

    1997-01-01

    There are discussed the mechanical properties of the new generation of steel as per European Standard EN 10208.2: 1996. on the basis of the mechanical parameters of steel the normalized graphs of steel tensioning are presented. Analysis of influence of expanding gas pipelines on changes of steel tensioning graphs were performed. Advantages, resulting from expanding of gas pipelines, were shown. (author)

  4. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  5. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  6. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  7. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  8. 76 FR 77583 - Vantage Pipeline US LP; Notice of Intent To Prepare an Environmental Assessment and Request for...

    Science.gov (United States)

    2011-12-13

    ... DEPARTMENT OF STATE [Public Notice 7728] Vantage Pipeline US LP; Notice of Intent To Prepare an... Section 106 of the National Historic Preservation Act for the Proposed Vantage Pipeline Project December 9... (EA) that will discuss the environmental impacts of the Vantage Pipeline Project involving...

  9. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  10. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  11. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  12. Wireless Sensor Networks for Long Distance Pipeline Monitoring

    OpenAIRE

    Augustine C. Azubogu; Victor E. Idigo; Schola U. Nnebe; Obinna S. Oguejiofor; Simon E.

    2013-01-01

    The main goal of this seminal paper is to introduce the application of Wireless Sensor Networks (WSN) in long distance infrastructure monitoring (in particular in pipeline infrastructure monitoring) – one of the on-going research projects by the Wireless Communication Research Group at the department of Electronic and Computer Engineering, Nnamdi Azikiwe University, Awka. The current sensor network architectures for monitoring long distance pipeline infrastructures are pr...

  13. Pipelines. Economy's veins; Pipelines. Adern der Wirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Feizlmayr, Adolf; Goestl, Stefan [ILF Beratende Ingenieure, Muenchen (Germany)

    2011-02-15

    According to the existing prognoses more than 1 million km of gas pipelines, oil pipelines and water pipelines are built up to the year 2030. The predominant portion is from gas pipelines. The safe continued utilization of the aging pipelines is a large challenge. In addition, the diagnostic technology, the evaluation and risk assessment have to be developed further. With the design of new oil pipelines and gas pipelines, aspects of environmental protection, the energy efficiency of transport and thus the emission reduction of carbon dioxide, the public acceptance and the market strategy of the exporters gain in importance. With the offshore pipelines one soon will exceed the present border of 2,000 m depth of water and penetrate into larger sea depths.

  14. Meeting the demands and challenges of a new era in pipeline development

    International Nuclear Information System (INIS)

    Morgan, K.

    2002-01-01

    The author demonstrates in this presentation that supply and demand imbalances result in energy shortages and extreme price volatility. This situation exists in spite of a dysfunctional market structure and allegations of market power abuse. Economic recovery is dependent on energy reliability and stable pricing. Investments in the infrastructure are required at all levels of the industry. The plans to better serve customers at Williams Gas Pipeline-West are described, including an investment of more than 2 billion dollars in natural gas pipeline in the West in 2004. The expansion projects on the Kern River are reviewed and put in perspective with regard to California emergency expansion. The current gas supply update is provided, as was the regional market outlook. The other pipeline proposals to serve California are discussed, in particular the Kern River 2003 expansion is deemed an essential infrastructure project to assist in the prevention of a return to energy shortages and extreme price volatility in California. The new pipeline capacity is fully supported by market demand. To supply the east of California and Mexican markets, a diversion of the gas supply from the Southwest will take place. It is doubtful that timely completion of other natural gas pipeline projects will occur. The author indicates that smaller incremental expansions of existing pipelines will serve market growth. figs

  15. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    Energy Technology Data Exchange (ETDEWEB)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes

  16. Modelling of project cash flow on construction projects in Malang city

    Science.gov (United States)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  17. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  18. PLUGGING AND UNPLUGGING OF WASTE TRANSFER PIPELINES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    This project, which began in FY97, involves both the flow loop research on plugging and unplugging of waste transfer pipelines, and the large-scale industrial equipment test of plugging locating and unplugging technologies. In FY98, the related work was performed under the project name ''Mixing, Settling, and Pipe Unplugging of Waste Transfer Lines.'' The mixing, settling, and pipeline plugging and unplugging are critical to the design and maintenance of a waste transfer pipeline system, especially for the High-Level Waste (HLW) pipeline transfer. The major objective of this work is to recreate pipeline plugging conditions for equipment testing of plug locating and removal and to provide systematic operating data for modification of equipment design and enhancement of performance of waste transfer lines used at DOE sites. As the waste tank clean-out and decommissioning program becomes active at the DOE sites, there is an increasing potential that the waste slurry transfer lines will become plugged and unable to transport waste slurry from one tank to another or from the mixing tank to processing facilities. Transfer systems may potentially become plugged if the solids concentration of the material being transferred increases beyond the capability of the prime mover or if upstream mixing is inadequately performed. Plugging can occur due to the solids' settling in either the mixing tank, the pumping system, or the transfer lines. In order to enhance and optimize the slurry's removal and transfer, refined and reliable data on the mixing, sampling, and pipe unplugging systems must be obtained based on both laboratory-scale and simulated in-situ operating conditions

  19. Security of pipeline facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.C. [Alberta Energy and Utilities Board, Calgary, AB (Canada); Van Egmond, C.; Duquette, L. [National Energy Board, Calgary, AB (Canada); Revie, W. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada)

    2005-07-01

    This working group provided an update on provincial, federal and industry directions regarding the security of pipeline facilities. The decision to include security issues in the NEB Act was discussed as well as the Pipeline Security Management Assessment Project, which was created to establish a better understanding of existing security management programs as well as to assist the NEB in the development and implementation of security management regulations and initiatives. Amendments to the NEB were also discussed. Areas of pipeline security management assessment include physical safety management; cyber and information security management; and personnel security. Security management regulations were discussed, as well as implementation policies. Details of the Enbridge Liquids Pipelines Security Plan were examined. It was noted that the plan incorporates flexibility for operations and is integrated with Emergency Response and Crisis Management. Asset characterization and vulnerability assessments were discussed, as well as security and terrorist threats. It was noted that corporate security threat assessment and auditing are based on threat information from the United States intelligence community. It was concluded that the oil and gas industry is a leader in security in North America. The Trans Alaska Pipeline Incident was discussed as a reminder of how costly accidents can be. Issues of concern for the future included geographic and climate issues. It was concluded that limited resources are an ongoing concern, and that the regulatory environment is becoming increasingly prescriptive. Other concerns included the threat of not taking international terrorism seriously, and open media reporting of vulnerability of critical assets, including maps. tabs., figs.

  20. Three Construction Projects with Wood Scraps

    Science.gov (United States)

    Levine, Elizabeth

    1977-01-01

    Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)

  1. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  2. Status of the S.E. Geysers effluent pipeline & injection project

    Energy Technology Data Exchange (ETDEWEB)

    Dellinger, M. [Lake County Sanitation District, Lakeport, CA (United States)

    1997-12-31

    A unique public/private partnership of local, state, federal, and corporate stakeholders is constructing the world`s first wastewater-to-electricity system in Lake County, California. A rare example of a genuinely {open_quotes}sustainable{close_quotes} system, three Lake County communities will recycle their treated wastewater effluent through the Geysers geothermal steamfield to produce an estimated 625,000 MWh of electricity annually from six existing geothermal power plants. The concept is shown schematically. Construction was initiated in October 1995, and as of this writing, the system is approximately 85% complete. Operational start-up is expected in October 1997. The key to the project`s success thus far has been its emphasis on cooperative action among affected stakeholders; and a broad, community-based view of solving problems rather than the traditional, narrower view of engineering-driven technical solutions. Special attention has been given to environmentally-responsive engineering design to avoid or minimize adverse environmental impacts.

  3. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  4. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  5. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  6. Advances in riser and pipeline technologies

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Wan C.; Mortazavi, Mehrdad; Weir, Michael S. [ExxonMobil Development Company, Dallas, TX (United States)

    2009-12-19

    As oil and gas production continues to move into new frontier areas, novel applications of the existing riser and pipeline technologies need to be developed to meet the often more stringent requirements encountered in these environments. The challenges include ultra deep water, harsh environments, aggressive fluid conditions, and local content objectives, etc. They will require industry to constantly extend, expand, and enhance the broad range of solution options. Also, the existing design criteria in industry may need to be revised or new criteria may need to be developed to satisfy these needs. Exxon Mobil (Em) employs, and works with others in industry to promote robust design and operating practices. This approach requires in-depth understanding, sound engineering principles, advanced analysis, uncertainty management, and supportive qualification test data. It enables confident selection, extrapolation, and innovation of technologies to address new riser system and pipeline challenges. Focus on fundamental is imperative to ensure integrity of the selected systems during fabrication, installation, and operation phases. Recent and past project experience in deep water Gulf of Mexico and West Africa provides many successful examples of this approach. This paper reviews several examples of the key riser system and pipeline technology enhancements recently achieved by EM to provide confidence in addressing technical and project application challenges. Riser system technology enhancements addressed in this paper include steel catenary riser (SCR) application on turret-moored FPSO with severe motions, pipe-in-pipe (PIP) hybrid production riser to effectively manage gas lift and flow assurance requirements, irregular wave analysis methodology for flexible risers and umbilicals to reduce conservatism, and qualification of riser and pipeline VIV prediction and mitigation methods. Pipeline technology enhancements detailed in this paper include lateral buckling prediction

  7. Experience with two pipeline river crossings in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Yaremko, Eugene [Northwest Hydraulic Consultants (NHC), Edmonton (Canada); D' Agnillo, Pablo; Diaz, Jose A. [Minera Alumbrera XTRADA Copper S.A., Buenos Aires (Argentina); Bravo, Claudio

    2009-12-19

    The Alumbrera copper-gold mine located in the Province of Catamarca, northwest region of Argentina, commenced operation in October, 1997. Mine development included a 316 km long, 175 mm diameter slurry pipeline that conveys copper concentrate to a dewatering facility near the city of Tucuman, Province of Tucuman. It became apparent during the first few years of operation that, given the many potential risks of pipeline exposure associated with stream crossings, Minera Alumbrera would have to undertake an aggressive, formal program of risk management of crossings and risk mitigation. In this paper, the experience associated with two crossings is addressed: Rio Villavil; and, Rio Gastona. The original pipeline route through the 10 km length of pipeline connecting Pump Station (PS) 2 to PS 3 was directed along the bottom of the Rio Villavil valley, with most of it located within the flood way of the stream. The exposure of the pipeline at some locations and high risk of further pipeline exposures led to initiation of risk mitigation planning. Remediation work was completed by 2008. Rio Gastona, during the summer of 2001, experienced rapid shifting of the left bank at the crossing resulting in an undermined and unsupported length of pipeline. The subsequent risk mitigation method adopted in 2001 involved the planning and construction of groyne fields along both banks. (author)

  8. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  9. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  10. Use of geographic information systems for applications on gas pipeline rights-of-way

    Energy Technology Data Exchange (ETDEWEB)

    Sydelko, P.J.; Wilkey, P.L.

    1992-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  11. Pipeline corridors through wetlands -- Impacts on plant communities: Norris Brook Crossing Peabody, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted August 17--19, 1992, at the Norris Brook crossing in the town of Peabody, Essex County, Massachusetts. The pipeline at this site was installed during September and October 1990. A backhoe was used to install the pipeline. The pipe was assembled on the adjacent upland and slid into the trench, after which the backhoe was used again to fill the trench and cover the pipeline. Within two years after pipeline construction, a dense vegetative community, composed predominantly of native perennial species, had become established on the ROW. Compared with adjacent natural areas undisturbed by pipeline installation, there was an increase in purple loosestrife and cattail within the ROW, while large woody species were excluded from the ROW. As a result of the ROW`s presence, habitat diversity, edge-type habitat, and species diversity increased within the site. Crooked-stem aster, Aster prenanthoides (a species on the Massasschusetts list of plants of special concern), occurred in low numbers in the adjacent natural areas and had reinvaded the ROW in low numbers.

  12. Alignment between ICT and communication in construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2004-01-01

    Through rapid advancements in ICT, opportunities arise in enhancing communication between participants of different organisations in construction projects. The use of ICT in construction is, however, relatively limited and ineffective compared to other sectors such as the automotive or the aerospace

  13. Applied methodology for replacement pipe arcs in integral pipelines TE 'Oslomej'

    Directory of Open Access Journals (Sweden)

    Temelkoska Bratica K.

    2016-01-01

    Full Text Available The integral pipelines in thermal power plants present a linear spatial bearing construction with high operating parameters, complex static and dynamic load. The integral pipelines along its entire length are hanging on construction spring hangers from the boiler building, where the boiler is placed, next to the machine hall where the turbine is placed. Therefore, it is important to monitor the condition and to remove any possible defects from the applied methods. This paper describes the methodology of replacement of the pipe arch on one of the integral pipelines-the line for hot superheated steam. In addition, in this paper are given the method methods that led to this methodology for testing and evaluation of the condition of the pipe arch material that had been in exploitation and the new pipe arch that will be embedded. Furthermore the approach, the technology of replacement, anchoring of the steam line, technology of welding etc., as well as the preparation of the final design of constructed condition are also covered in this paper.

  14. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Adoption and Use of Interorganizational ICT in a Construction Project

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    The objective of this research is to explain why actors are not using interorganizational information and communication technology (ICT) in construction projects in the intended way, by determining the mechanisms that influence the way actors use this ICT over time during a construction project.

  16. Evaluation of revegetation progress and erosion-prone areas along oil and gas pipelines in Azerbaijan

    Energy Technology Data Exchange (ETDEWEB)

    Bayramov, Emil [BP British Petroleum, Baku (Azerbaijan)

    2012-09-15

    The construction of the Baku-Tbilisi-Ceyhan (BTC) oil and South Caucasus gas (SCP) pipelines was completed in 2005 and 2006, respectively. The Azerbaijan section of the BTC oil and SCP gas pipelines is 442 km long and lies in a 44 m wide corridor named as the Right-of-Way (RoW). BTC and SCP pipelines are aligned parallel to each other within the RoW. The construction process significantly disturbed vegetation and soil cover along the RoW of the pipelines. The revegetation and erosion control measures were conducted after the completion of construction to restore disturbed footprints of construction. The general goals of the present studies, dedicated to the environmental monitoring and erosion control measures were to evaluate the status of the revegetation in 2007 since the completion of the construction activities and to determine erosion-prone areas along the RoW. Quantitative assessment of vegetation cover (VC) was based on the regression and RMSE analysis using IKONOS NDVI 2007 and in-situ estimation of VC percentage for the normalization of NDVI to VC. The prediction of erosion-prone areas was based on the Universal Soil Loss Equation (USLE). The prediction reliability of USLE was evaluated using in-situ collected erosion occurrences. (orig.)

  17. Induced AC voltages on pipelines may present a serious hazard

    International Nuclear Information System (INIS)

    Kirkpatrick, E.L.

    1997-01-01

    The problem of induced AC voltages on pipelines has always been with us. Early pipeline construction consisted of bare steel or cast iron pipe, which was very well grounded. Bell and spigot, mechanical, or dresser-style joint couplings often were used, creating electrically discontinuous pipelines which are less susceptible to AC induction. Although induced AC affects any pipeline parallel to a high-voltage alternating current (HVAC) power line, the effects were not noticeable on bare pipelines. With the advent of welded steel pipelines, modern cathodic protection (CP) methods and materials, and the vastly improved quality of protective coatings, induced AC effects on pipelines have become a significant consideration on many pipeline rights-of-way. In the last two to three decades, one has been seeing much more joint occupancy of the same right-of-way by one or more pipelines and power lines. As the cost of right-of-way and the difficulty in acquisition, particularly in urban areas, have risen, the concept of joint occupancy rights-of-way has become more attractive to many utility companies. Federal and state regulations usually insist on joint-use right-of-way when a utility proposes crossing regulated or publicly owned lands, wherever there is an existing easement. Such joint use allows the induced AC phenomena to occur and may create electrical hazards and interference to pipeline facilities. Underground pipelines are especially susceptible if they are well-coated and electrically isolated for CP

  18. The transit oil and gas pipeline and the role of bargaining: A non-technical discussion

    International Nuclear Information System (INIS)

    Omonbude, Ekpen J.

    2007-01-01

    Transit oil and gas pipelines are growing in relevance, and face a number of topical problems. One of such issues is the problem of potential disruption from a number of sources, notably post-construction behaviour of the transit country. Present and future pipelines face the risk of continuous conflict over legal, economic and political issues. Once the pipeline is built and in operation, the threat of disruption of the pipeline by the transit country over disputed transit terms exists. This is due to two key problems: first, a shift in bargaining powers to the transit country upon construction and operation of the pipeline and, second, changes in the value of the throughput imply price changes that can affect the behaviour of the transit country. This paper discusses the role of basic bargaining principles in cross-border oil and gas pipelines involving transit through one or more countries. It finds that the motive behind the pipeline plays a key role in the prevention of potential disruptions to the pipeline due to rent squeezing. Also, although the potential of such disruptions does exist, there are a number of factors that could serve to mute the consequences of shifts in bargaining power to the transit countries

  19. Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects

    OpenAIRE

    Gamil Yaser; Abdul Rahman Ismail; Nagapan Sasitharan; Alemad Nashwan

    2017-01-01

    Large construction projects in Yemen face many impediments and challenges to be completed successfully. This article presents an investigative cases study of three mega construction projects which are considered failed to achieve their assigned plans and objectives. An exploratory interview was implied in this study via telephone to three construction experts who involved directly in these mega projects at the managerial level. Semi-structured questions based on literature were designed as gu...

  20. Bauxite slurry pipeline: start up operation

    Energy Technology Data Exchange (ETDEWEB)

    Othon, Otilio; Babosa, Eder; Edvan, Francisco; Brittes, Geraldo; Melo, Gerson; Janir, Joao; Favacho, Orlando; Leao, Marcos; Farias, Obadias [Vale, Rio de Janeiro, RJ (Brazil); Goncalves, Nilton [Anglo Ferrous Brazil S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The mine of Miltonia is located in Paragominas-PA, in the north of Brazil. Bauxite slurry pipeline starts at the Mine of Miltonia and finishes in the draining installation of Alunorte refinery at the port of Barcarena-PA, located approximately 244km away from the mine. The pipeline runs over seven cities and passes below four great rivers stream beds. The system was designed for an underground 24 inches OD steel pipe to carry 9.9 million dry metric tonnes per annum (dMTAs) of 50.5% solid concentration bauxite slurry, using only one pumping station. The system is composed by four storage tanks and six piston diaphragm pumps, supplying a flow of 1680 m3/h. There is a cathodic protection system along the pipeline extension to prevent external corrosion and five pressure monitoring stations to control hydraulic conditions, there is also a fiber optic cable interconnection between pump station and terminal station. Pipeline Systems Incorporated (PSI) was the designer and followed the commissioning program of the start up operations. This paper will describe the beginning of the pipeline operations, technical aspects of the project, the operational experiences acquired in these two years, the faced problems and also the future planning. (author)

  1. Causes of Low-Skilled Workers’ Performance in Construction Projects

    Directory of Open Access Journals (Sweden)

    Alhaji Ali Zannah

    2017-06-01

    Full Text Available Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achieved through a structured quantitative method of questionnaire distributed to 150 respondents that comprise of active stakeholders in the Nigerian construction industry. 111 responses representing 74 % were retrieved. The data were analysed using descriptive statistics and analysis of variance (ANOVA. The finding shows that; low wages of skilled, lack of sufficient skill acquisition centres and lack of incentive schemes for skilled workers were the most significant causes of low-skilled workers’ performance in the Nigerian construction industry. The homogenous analysis indicates that there are significant differences in perception of respondents on few variables whereas majority of respondents have similarities in most of the variables. The research findings indicate the need for stakeholders in the Nigerian construction industry to provide incentives and motivate skilled workers, provide training and retraining, conducive working condition, supply of quality materials and equipment, and proper site management in order improve low-skilled workers’ performance in Nigerian construction industry towards optimal performance.

  2. Geology knowledge application in civil engineering realization: Gas Pipeline

    International Nuclear Information System (INIS)

    Techera, J.

    2001-01-01

    The Company manager for the building project of south gas pipeline contracted technical services to National Direction of Geology and Mining DINAMIGE for study the geology.It studied Colonia-Montevideo stretch s and then Colonia-Porto Alegre stretch s of gas pipeline.The main purpose was determine the physical and mechanics earthly characteristic for in a future to bury the gas pipe

  3. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  4. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  5. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  6. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  7. Practical approach on gas pipeline compression system availability analysis

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney Pereira dos [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Kurz, Rainer; Lubomirsky, Matvey [Solar Turbines, San Diego, CA (United States)

    2009-12-19

    Gas pipeline projects traditionally have been designed based on load factor and steady state flow. This approach exposes project sponsors to project sustainability risks due to potential losses of revenues and transportation contract penalties related to pipeline capacity shortage as consequence of compressor unit's unavailability. Such unavailability should previously be quantified during the design phase. This paper presents a case study and a methodology that highlights the practical benefits of applying Monte Carlo simulation for the compression system availability analysis in conjunction with quantitative risk analysis and economic feasibility study. Project economics main variables and their impacts on the project NPV (Net Present Value) are evaluated with their respective statistics distribution to quantify risk and support decision makers to adopt mitigating measures to guarantee competitiveness while protecting project sponsors from otherwise unpredictable risks. This practical approach is compared to load factor approach and the results are presented and evaluated. (author)

  8. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  9. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  10. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  11. Using finite element method in the processof strength calculation for the pipeline supports in above-groundarea of "Zapolyar'e — NPS "PUR-PE" oil pipeline

    Directory of Open Access Journals (Sweden)

    Surikov Vitaliy Ivanovich

    2014-01-01

    Full Text Available The present article studies a procedure of calculating the strength of pipeline support constructions of the above-ground oil trunk pipeline system «Zapolyar'e — oil pumping station «Pur-pe». The calculations of the supports stress-strain state are performed with the use of computer complex Ansys v13, which applies the finite element method. The article provides a short description of the construction of fixed, linear-sliding and free-sliding supports of the oil pipeline of above-ground routing, developed for the installation in complex climatic and geologic conditions of the far north. According to the operation specification for design — the support constructions have to maintain the resistance power and bearing capacity under the influence of the pipeline stress without sagging and considering the possible sagging of the neighboring support. The support constructions represent space structures with a complex geometry. Together with the complex geometry, contacting elements are present in the construction of the supports. There is also an interaction of the pile foundation and the nonhomogeneous foundation. The enumerated peculiarities of the construction and operating conditions of the supports considerably complicate the strength calculations by engineering methods. The method of numerical modeling (finite element method used in the article for the analysis of the supports’ operation under the stress is widely applied at the present time for calculations of space structures with a complex geometry. For the first time, while performing the supports’ strength calculations, the article considers the mutual deformation of the support, foundation grill and pile foundation in the ground, thus making it possible to consider real operation of the construction altogether. The main development stages of the calculation model “support — pile foundation — ground” in ANSYS, calculation and testing of the static strength of the support

  12. Internal Corrosion Detection in Liquids Pipelines

    Science.gov (United States)

    2012-01-01

    PHMSA project DTRS56-05-T-0005 "Development of ICDA for Liquid Petroleum Pipelines" led to the development of a Direct Assessment (DA) protocol to prioritize locations of possible internal corrosion. The underlying basis LP-ICDA is simple; corrosion ...

  13. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  14. The influence of the internal microbiome on the materials used for construction of the transmission natural gas pipelines in the Lodz Province

    Directory of Open Access Journals (Sweden)

    Staniszewska Agnieszka

    2017-01-01

    Full Text Available This paper presents investigation results of the influence of gas microbes on the biocorrosion rate of the materials used for gas pipelines construction in the Lodz Province. Samples of two types of carbon steel and cast iron were stored in the laboratory pipeline model reflecting the real conditions of working natural gas pipelines were. In the next step the influence of cathodic protection with parameters recommended for protection of underground structures was tested. Analyses of biological corrosion products generated on the test surface were carried out using a scanning electron microscope with an X-ray analyzer. The level of ATP was measured to confirm presence of the adsorbed microorganisms on the observed structures. Corrosion rates were determined by gravimetric methods. In the course of the study it was revealed that the rate of biocorrosion of steel is lower than that for cast iron. Our results also proved that the weight corrosion rate depends on the number of adhered microorganisms. In addition, it has been found that application of the carbon steel cathodic protection decreases its weight corrosion rate. The information obtained will help to increase the knowledge on the rate of biological corrosion causing losses/pits inside gas pipline.

  15. Constructing Flexible, Configurable, ETL Pipelines for the Analysis of "Big Data" with Apache OODT

    Science.gov (United States)

    Hart, A. F.; Mattmann, C. A.; Ramirez, P.; Verma, R.; Zimdars, P. A.; Park, S.; Estrada, A.; Sumarlidason, A.; Gil, Y.; Ratnakar, V.; Krum, D.; Phan, T.; Meena, A.

    2013-12-01

    A plethora of open source technologies for manipulating, transforming, querying, and visualizing 'big data' have blossomed and matured in the last few years, driven in large part by recognition of the tremendous value that can be derived by leveraging data mining and visualization techniques on large data sets. One facet of many of these tools is that input data must often be prepared into a particular format (e.g.: JSON, CSV), or loaded into a particular storage technology (e.g.: HDFS) before analysis can take place. This process, commonly known as Extract-Transform-Load, or ETL, often involves multiple well-defined steps that must be executed in a particular order, and the approach taken for a particular data set is generally sensitive to the quantity and quality of the input data, as well as the structure and complexity of the desired output. When working with very large, heterogeneous, unstructured or semi-structured data sets, automating the ETL process and monitoring its progress becomes increasingly important. Apache Object Oriented Data Technology (OODT) provides a suite of complementary data management components called the Process Control System (PCS) that can be connected together to form flexible ETL pipelines as well as browser-based user interfaces for monitoring and control of ongoing operations. The lightweight, metadata driven middleware layer can be wrapped around custom ETL workflow steps, which themselves can be implemented in any language. Once configured, it facilitates communication between workflow steps and supports execution of ETL pipelines across a distributed cluster of compute resources. As participants in a DARPA-funded effort to develop open source tools for large-scale data analysis, we utilized Apache OODT to rapidly construct custom ETL pipelines for a variety of very large data sets to prepare them for analysis and visualization applications. We feel that OODT, which is free and open source software available through the Apache

  16. Preventing erosion at pipeline crossings of watercourses

    International Nuclear Information System (INIS)

    Sawatsky, L.; Arnold, G.

    1997-01-01

    Watercourses are naturally vulnerable to erosion but the risk is particularly acute after sub-soil and armour materials have been disturbed by trenching and backfilling during construction. Various types of erosion (river scour, river bed, river channel bed and river bank ) and the progressive removal of pipeline cover resulting from erosion were discussed. Methods of estimating the risk of progressive erosion, river avulsions and beaver dam scour, and methods of mitigating erosion at pipeline crossings such as deep burial, proper siting, conventional armouring, and a combination of bank toe protection, and upper bank vegetation cover, were described

  17. Putting the coal slurry pipelines to the test

    Energy Technology Data Exchange (ETDEWEB)

    Sauermann, H B

    1978-03-01

    This paper deals with the advantages and disadvantages of coal slurry pipelines and describes coal slurry tests undertaken in three test circuits with 100, 200 and 250 mm diameter pipes. The test results from the test circuits were used to scale-up pressure gradients to larger pipe diameters. The construction and installation of hydraulic transport pipelines is simple and requires a minimum of space. The crossing of rivers, roads, railways or any other obstacles is comparatively easy. The operation, supervision and maintenance of a pipeline is simple since any pipeline can be easily adapted for fully automatic control. For this reason manpower requirements are small resulting in only small increases in operating costs during the life of a pipeline. This is an attractive feature in any economy troubled by inflationary trends. In transporting a commodity such as coal the quantities handled are usually large and the distances are long. The profitability of hydraulic transportation systems benefits from such operating conditions. Even though the various components of a slurry transport system, such as the slurrying facilities at the mine end and the dewatering facilities at the utilization end, are complex, their reliability is high. Against the advantages, the following limitations can be visualized: It is practically impossible to transport solids other than those for which the pipeline was designed; in this regard, road and rail transportation is more versatile. The solids throughput through a pipeline cannot be economically increased beyond its design throughput. Pipelining involves the use of fluids, in most cases water, which in some instances may not be readily available.

  18. Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-07-01

    Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.

  19. INVESTIGATION OF PIPELINES INTEGRITY ASSOCIATED WITH PUMP MODULES VIBRATION FOR PUMPING STATION 9 OF ALYESKA PIPELINE SERVICE COMPANY

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jy-An John [ORNL

    2009-09-01

    Since the operation of PS09 SR module in 2007, it has been observed that there is vibration in various parts of the structures, on various segments of piping, and on appurtenance items. At DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) request, ORNL Subject Matter Experts support PHMSA in its review and analysis of the observed vibration phenomenon. The review and analysis consider possible effects of pipeline design features, vibration characteristics, machinery configuration, and operating practices on the structural capacity and leak tight integrity of the pipeline. Emphasis is placed on protection of welded joints and machinery against failure from cyclic loading. A series of vibration measurements were carried out by the author during the site visit to PS09, the power of the operating pump during the data collection is at about 2970KW, which is less than that of APSC's vibration data collected at 3900KW. Thus, a first order proportional factor of 4900/2970 was used to project the measured velocity data to that of APSC's measurement of the velocity data. It is also noted here that the average or the peak-hold value of the measured velocity data was used in the author's reported data, and only the maximum peak-hold data was used in APSC's reported data. Therefore, in some cases APSC's data is higher than the author's projective estimates that using the average data. In general the projected velocity data are consistent with APSC's measurements; the examples of comparison at various locations are illustrated in the Table 1. This exercise validates and confirms the report vibration data stated in APSC's summary report. After the reinforcement project for PS09 Station, a significant reduction of vibration intensity was observed for the associated pipelines at the SR Modules. EDI Co. provided a detailed vibration intensity investigation for the newly reinforced Pump Module structures and the associated

  20. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  1. Bridging the logistics gap for sustainable ethanol production: the CentroSul ethanol pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Megiolaro, Moacir; Daud, Rodrigo; Pittelli, Fernanda [CentroSul Transportadora Dutoviaria, SP (Brazil); Singer, Eugenio [EMS Consultant, Sao Paulo, SP (Brazil)

    2009-07-01

    The continuous increase of ethanol production and growth in consumption in Brazil is a reality that poses significant logistics challenges both for producers and consumers. The Brazilian local market absorbs a great portion of the country's production of ethanol, but the export market is also experiencing significant expansion so that both local and external market consumption will require more adequate transportation solutions. The alternative routes for Brazilian ethanol exports within the South and Southeast regions of Brazil range from the port of Paranagua, in the state of Parana, to the port of Vitoria, in the state of Espirito Santo. Each of these routes is about 1,000 km distance from the main production areas in the Central South states of Brazil. Brazilian highways and railways systems are overly congested and do not present efficient logistics alternatives for the transportation of large ethanol flows over long distances (cross-country) from the central Midwest regions of the country to the consumer and export markets in the Southeast. In response to the challenge to overcome such logistic gaps, CentroSul Transportadora Dutoviaria 'CentroSul', a company recently founded by a Brazilian ethanol producer group, the Brenco Group, is developing a project for the first fully-dedicated ethanol pipeline to be constructed in Brazil. The ethanol pipeline will transport 3,3 million m{sup 3} of Brenco - Brazilian Renewable Energy Company's ethanol production and an additional 4,7 million cubic meters from other Brazilian producers. The pipeline, as currently projected, will, at its full capacity, displace a daily vehicle fleet equivalent to 500 trucks which would be required to transport the 8,0 million cubic meters from their production origins to the delivery regions. In addition, the project will reduce GHG (trucking) emissions minimizing the project's overall ecological footprint. Key steps including conceptual engineering, environmental

  2. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  3. Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report

    Science.gov (United States)

    2008-11-26

    The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...

  4. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  5. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  6. Use of GRASS for routing gas pipeline rights-of-way

    International Nuclear Information System (INIS)

    Sydelko, P.J.

    1992-01-01

    This study, sponsored by the Gas Research Institute (GRI), was conducted to illustrate how a GIS (Geographic Information System) can be used to assess alternative routes for new gas pipeline rights-of-way (ROWs). The results show that a least-cost analysis using GRASS (Geographic Resources Analysis and Support System) is a good method for siting new gas pipeline ROWs on the basis of environmental and engineering constraints to pipeline construction and maintenance. The cost and time needed to use this least-cost approach compare favorably with the current methods used by gas pipeline company planners and engineers. The types of criteria used, as well as the costs or weights given to the criteria, can be changed easily. This provides the flexibility to assess several alternatives quickly and easily

  7. Environmental impact analysis; the example of the proposed Trans-Alaska Pipeline

    Science.gov (United States)

    Brew, David A.

    1974-01-01

    The environmental impact analysis made as required by the National Environmental Policy Act of 1969 for the proposed trans-Alaska pipeline included consideration of the (1) technologically complex and geographically extensive proposed project, (2) extremely different physical environments across Alaska along the proposed route and elsewhere in Alaska and in Canada along alternative routes, (3) socioeconomic environment of the State of Alaska, and (4) a wide variety of alternatives. The analysis was designed specifically to fit the project and environment that would be affected. The environment was divided into two general parts--natural physical systems and superposed socioeconomic systems--and those parts were further divided into discipline-oriented systems or components that were studied and analyzed by scientists of the appropriate discipline. Particular attention was given to potential feedback loops in the impact network and to linkages between the project's impacting effects and the environment. The results of the analysis as reported in the final environmental impact statement were that both unavoidable and threatened environmental impacts would result from construction, operation, and maintenance of the proposed pipeline system and the developments related to it. The principal unavoidable effects would be (1) disturbances of terrain, fish and wildlife habitat, and human environs, (2) the results of the discharge of effluent from the tanker-ballast-treatment facility into Port Valdez and of some indeterminate amount of oil released into the ocean from tank-cleaning operations at sea, and (3) the results associated with increased human pressures of all kinds on the environment. Other unavoidable effects would be those related to increase of State and Native Corporation revenues, accelerated cultural change of the Native population, and extraction of the oil and gas resource. The main threatened environmental effects would all be related to unintentional oil

  8. Bourgas-Alexandroupolis oil pipeline; will matching institutional and regulatory contexts lead to an effective bargaining and eventual consensus?

    International Nuclear Information System (INIS)

    Menegaki, Angeliki N.

    2011-01-01

    This paper employs Muthoo's bargaining principles/prerequisites for an effective bargaining result (. A Non-Technical Introduction to Bargaining Theory, World Economics 1(2): 145-166) to decide whether Greece and Bulgaria can form a successful energy coalition. Motivation for this is the proposed construction of the crude oil pipeline from the Bulgarian port Burgas to the Greek Aegean port of Alexandroupolis. The reason Turkey is the third country in the analysis despite its current non-membership in this venture, is that: (i) Turkey offers to host a competitive route of the pipeline, (ii) It is a transit, neighboring country to Greece forming an important geopolitical triangle together with Greece and Bulgaria and (iii) co-operates separately with Bulgaria and Greece in other energy pipelines. Therefore, the three countries engage to interwining energy and geopolitical futures. Whether B-A oil pipeline will be implemented or not, will be due to a mix of bargaining procedures. The paper shows that Muthoo's principles/prerequisites for an effective bargaining result, through their constituents (selected economy and energy figures and characteristics), are fulfilled by Greece and Bulgaria. A broader coalition with the inclusion of Turkey might also be permissible and promising based on this theory. - Research Highlights: →The B-A oil pipeline project is currently at a junction point. Bargaining and public discussion is ongoing. →Muthoo's principles/prerequisites for an effective bargaining result, through their constituents (selected economy, energy, socio-demographic and E-governance figures and characteristics as well as environmental effects and construction characteristics of the pipeline), are fulfilled by Greece and Bulgaria. Therefore the two countries match in all parameters and remains pending the last but not least point of agreement, namely citizens' consensus. →A broader coalition with the inclusion of Turkey might also be permissible and promising

  9. Bourgas-Alexandroupolis oil pipeline; will matching institutional and regulatory contexts lead to an effective bargaining and eventual consensus?

    Energy Technology Data Exchange (ETDEWEB)

    Menegaki, Angeliki N., E-mail: amenegaki@her.forthnet.g [Democritus University of Thrace, Department of Languages, Literature and Civilization of Black Sea Countries, Polytechniou 7A, 69100 Komotini (Greece)

    2011-03-15

    This paper employs Muthoo's bargaining principles/prerequisites for an effective bargaining result (. A Non-Technical Introduction to Bargaining Theory, World Economics 1(2): 145-166) to decide whether Greece and Bulgaria can form a successful energy coalition. Motivation for this is the proposed construction of the crude oil pipeline from the Bulgarian port Burgas to the Greek Aegean port of Alexandroupolis. The reason Turkey is the third country in the analysis despite its current non-membership in this venture, is that: (i) Turkey offers to host a competitive route of the pipeline, (ii) It is a transit, neighboring country to Greece forming an important geopolitical triangle together with Greece and Bulgaria and (iii) co-operates separately with Bulgaria and Greece in other energy pipelines. Therefore, the three countries engage to interwining energy and geopolitical futures. Whether B-A oil pipeline will be implemented or not, will be due to a mix of bargaining procedures. The paper shows that Muthoo's principles/prerequisites for an effective bargaining result, through their constituents (selected economy and energy figures and characteristics), are fulfilled by Greece and Bulgaria. A broader coalition with the inclusion of Turkey might also be permissible and promising based on this theory. - Research Highlights: {yields}The B-A oil pipeline project is currently at a junction point. Bargaining and public discussion is ongoing. {yields}Muthoo's principles/prerequisites for an effective bargaining result, through their constituents (selected economy, energy, socio-demographic and E-governance figures and characteristics as well as environmental effects and construction characteristics of the pipeline), are fulfilled by Greece and Bulgaria. Therefore the two countries match in all parameters and remains pending the last but not least point of agreement, namely citizens' consensus. {yields}A broader coalition with the inclusion of Turkey might

  10. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  11. A new framework for construction project definition stage

    DEFF Research Database (Denmark)

    Pikas, Ergo; Oehmen, Josef; Koskela, Lauri

    2018-01-01

    One major reason for the poor performance of construction project delivery is related to the 'ill'- performed project definition stage. The emphasis on rational decision-making and methods have stifled the creativity important to problem structuring and solution generation. Problem is in the poor...

  12. The influence of client brief and change order in construction project

    Science.gov (United States)

    Mahat, N. A. A.; Adnan, H.

    2018-02-01

    Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.

  13. Final supplement to the final environmental statement related to construction of Skagit Nuclear Power Project, Units 1 and 2: (Docket Nos. STN 50-522 and STN 50-523)

    International Nuclear Information System (INIS)

    1977-04-01

    The proposed action is the issuance of construction permits to the Puget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Portland General Electric Company, for the construction of Skagit Nuclear Power Projects Units 1 and 2 in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1984 and 1986, respectively. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser. Approximately 1750 acres of forested and agricultural land will be removed from harvesting for the life of the power plant; 360 acres of this land will be diverted to industrial use. This will affect less than 0.5% of standing forest in Skagit County and 16 acres in cultivated crops and pasturage. Increased siltation of onsite creeks and the Skagit River from construction work and the small amounts of heat and chemicals discharged to the river during plant operation will have insignificant impacts on water quality and aquatic biota due to erosion control efforts and dilution by the large river flow. (16,200 cfs average; 4740 cfs 7-day, 10-yr low). 18 figs

  14. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    Science.gov (United States)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  15. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  16. The benefits of SCADA integrated pipeline leak detection

    Energy Technology Data Exchange (ETDEWEB)

    Pichler, Ruprecht M.J. [Pichler Engineering GmbH, Munich (Germany)

    2003-07-01

    Software based leak detection and locating for pipelines based upon evaluation of hydraulic parameters is a widely used approach to online pipeline integrity monitoring. Typically, these software packages are installed in a stand-alone configuration with a narrow bandwidth interface to the pipeline SCADA system. However, the performance characteristics of the SCADA system and interface do have a substantial impact on the performance of the leak detection system. By a tight integration of leak detection software into the SCADA system, a source of false alarms typically experienced with leak detection systems can be eliminated, the overall performance of the leak detection system can be improved, and the project costs can be reduced. (author)

  17. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  18. Feasibility study on rehabilitation and optimization of gas pipeline network/system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a survey was conducted on repairs and optimization of gas pipeline net/system in Bangladesh. In the survey, the measurement of methane gas concentration, wind direction/velocity and temperature was made for 16 stations of BC pipeline and BD pipeline including Ring Line. As a result of the measurement, the amount of methane leakage totaled 5,300 tons/year including 1,300 tons in BD pipeline, 2,500 tons in BC pipeline and 1,500 tons in Ring Line. For repairs/optimization of the pipeline net/system, the necessity of the following was pointed out: exchanges of gaskets, piping and valves; repairs of portions of the pipeline exposure; exchanges of pressure control valves and flowmeters; repair of the corrosion prevention system. In this improvement project, the reduction amount of greenhouse effect gas emissions will be 5,300 tons/year and approximately 106,000 tons in 20 years. The conservation will amount to 0.66 MMUS$/year. (NEDO)

  19. The LCOGT Science Archive and Data Pipeline

    Science.gov (United States)

    Lister, Tim; Walker, Z.; Ciardi, D.; Gelino, C. R.; Good, J.; Laity, A.; Swain, M.

    2013-01-01

    Las Cumbres Observatory Global Telescope (LCOGT) is building and deploying a world-wide network of optical telescopes dedicated to time-domain astronomy. In the past year, we have deployed and commissioned four new 1m telescopes at McDonald Observatory, Texas and at CTIO, Chile, with more to come at SAAO, South Africa and Siding Spring Observatory, Australia. To handle these new data sources coming from the growing LCOGT network, and to serve them to end users, we have constructed a new data pipeline and Science Archive. We describe the new LCOGT pipeline, currently under development and testing, which makes use of the ORAC-DR automated recipe-based data reduction pipeline and illustrate some of the new data products. We also present the new Science Archive, which is being developed in partnership with the Infrared Processing and Analysis Center (IPAC) and show some of the new features the Science Archive provides.

  20. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  1. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  2. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  3. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  4. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  5. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  6. The southern corridor for natural gas and the last days of Nabucco. Transport of natural gas and Nabucco pipeline; Der suedliche Gaskorridor und die letzten Tage von Nabucco. Gastransport und Nabucco-Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Mangott, Gerhard [Innsbruck Univ. (Austria). Fakultaet fuer Politikwissenschaft und Soziologie

    2012-11-12

    As a strategic project management with a transport capacity of 31 billion m{sup 3} per year of natural gas, Nabucco 1.0 should diversify the natural gas suppliers for the EU market and the import pipeline network. Significant amounts of natural gas should be imported from the Caspian and the Middle East region. Nabucco 1.0 failed as a project management. The Nabucco consortium wants to convey natural gas through a small-scale and cheaper Nabucco west pipeline via Bulgaria, Romania and Hungary to Austria. Also the Trans-Adriatic Pipeline will transport the same natural gas reserves into the European Union (EU).

  7. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  8. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  9. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  10. Construction of new tie-in in the Bolivia-Brazil Gas Pipeline (GASBOL) using hot tapping techniques; Derivacao do Gasoduto Bolivia-Brasil com a tecnica de hot-tapping

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Frota, Cristiane Souto; Leite Filho, Ismael Casono; Lobao Filho, Jesualdo Pereira; Saavedra, Marcelo Curto [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    To supply 2,4 MM m3/d of natural gas to Tres Lagoas thermo electric plant, it was necessary to install a new delivery point of 12'' in the 32'' trunk line of Bolivia-Brazil gas pipeline. The most efficient method for executing new delivery points and maintenance repairs in pipelines is using the 'hot-tapping' technique, because there is no need to stop flow and blow down lines. This paper shows the project, specifications, planning and a detailed job execution to support this new city-gate, using a T split sleeve welded in the pipeline, explaining all the activities. Complex and innovative aspects related to the welding and inspection processes, executed in a API 5L X70 pipe at 92 kgf/cm{sup 2}, are also reported. (author)

  11. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  12. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  13. Economic evaluation of CO2 pipeline transport in China

    International Nuclear Information System (INIS)

    Zhang Dongjie; Wang Zhe; Sun Jining; Zhang Lili; Li Zheng

    2012-01-01

    Highlights: ► We build a static hydrodynamic model of CO 2 pipeline for CCS application. ► We study the impact on pressure drop of pipeline by viscosity, density and elevation. ► We point out that density has a bigger impact on pressure drop than viscosity. ► We suggest dense phase transport is preferred than supercritical state. ► We present cost-optimal pipeline diameters for different flowrates and distances. - Abstract: Carbon capture and sequestration (CCS) is an important option for CO 2 mitigation and an optimized CO 2 pipeline transport system is necessary for large scale CCS implementation. In the present work, a hydrodynamic model for CO 2 pipeline transport was built up and the hydrodynamic performances of CO 2 pipeline as well as the impacts of multiple factors on pressure drop behavior along the pipeline were studied. Based on the model, an economic model was established to optimize the CO 2 pipeline transport system economically and to evaluate the unit transport cost of CO 2 pipeline in China. The hydrodynamic model results show that pipe diameter, soil temperature, and pipeline elevation change have significant influence on the pressure drop behavior of CO 2 in the pipeline. The design of pipeline system, including pipeline diameter and number of boosters etc., was optimized to achieve a lowest unit CO 2 transport cost. In regarding to the unit cost, when the transport flow rate and distance are between 1–5 MtCO 2 /year and 100–500 km, respectively, the unit CO 2 transport cost mainly lies between 0.1–0.6 RMB/(tCO 2 km) and electricity consumption cost of the pipeline inlet compressor was found to take more than 60% of the total cost. The present work provides reference for CO 2 transport pipeline design and for feasibility evaluation of potential CCS projects in China.

  14. The gas century: worldwide LNG developments may deal death blow to Alaskan pipeline dream

    International Nuclear Information System (INIS)

    Lorenz, A.

    2004-01-01

    The growing interest in liquefied natural gas (LNG), which casts doubt on the viability of the Alaska gas pipeline, and the potential impacts on Canadian gas exports to the United States are discussed. There is currently a proposal before Congress for an Alaskan LNG project, and consensus appears to be building among American energy experts and law-makers that building a multitude of LNG facilities would be more flexible and cheaper than building the proposed Alaska pipeline. As further proof of the growing popularity of LNG, U.S. industry lobbyists are said to be rapidly gaining congressional support for the idea of building eight to ten billion cubic feet per day of LNG capacity along the U. S. coast. Either development, -- LNG facilities or the Alaska pipeline -- have the potential to seriously impact Canadian natural gas exports. If the Alaska pipeline is built, the addition of five billion cubic feet per day of new gas on the market would cause gas prices to fall; if the U.S. decides to subsidize its gas industry, Canadian gas would be put at a serious disadvantage. Conversely, if the Alaskan LNG proposal were to succeed, the potential demise of the Alaska pipeline would mean the loss of about 12,000 jobs that would be created during the Canadian construction phase of the pipeline, as well as the loss of tariffs. Industry experts predict that by 2005 LNG terminals will dot the periphery of the U. S. coast line; to prepare for these eventualities, Canadian companies, such as Irving Oil, TransCanada Pipelines and EnCana are taking note, and are scrambling not to be left out of the game. As proof of the seriousness of their concern, Irving Oil is adding a Can$500 million LNG facility to its Canaport terminal on the Scotian shelf; TCPL is working to supply an LNG terminal offshore Massachusetts, and EnCana is refurbishing a Louisiana salt cavern to prepare for storage of gas delivered to the Gulf Coast

  15. A microscale protein NMR sample screening pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, Paolo; Swapna, G. V. T.; Huang, Yuanpeng J.; Aramini, James M. [State University of New Jersey, Center for Advanced Biotechnology and Medicine, Department of Molecular Biology and Biochemistry, Rutgers (United States); Anklin, Clemens [Bruker Biospin Corporation (United States); Conover, Kenith; Hamilton, Keith; Xiao, Rong; Acton, Thomas B.; Ertekin, Asli; Everett, John K.; Montelione, Gaetano T., E-mail: guy@cabm.rutgers.ed [State University of New Jersey, Center for Advanced Biotechnology and Medicine, Department of Molecular Biology and Biochemistry, Rutgers (United States)

    2010-01-15

    As part of efforts to develop improved methods for NMR protein sample preparation and structure determination, the Northeast Structural Genomics Consortium (NESG) has implemented an NMR screening pipeline for protein target selection, construct optimization, and buffer optimization, incorporating efficient microscale NMR screening of proteins using a micro-cryoprobe. The process is feasible because the newest generation probe requires only small amounts of protein, typically 30-200 {mu}g in 8-35 {mu}l volume. Extensive automation has been made possible by the combination of database tools, mechanization of key process steps, and the use of a micro-cryoprobe that gives excellent data while requiring little optimization and manual setup. In this perspective, we describe the overall process used by the NESG for screening NMR samples as part of a sample optimization process, assessing optimal construct design and solution conditions, as well as for determining protein rotational correlation times in order to assess protein oligomerization states. Database infrastructure has been developed to allow for flexible implementation of new screening protocols and harvesting of the resulting output. The NESG micro NMR screening pipeline has also been used for detergent screening of membrane proteins. Descriptions of the individual steps in the NESG NMR sample design, production, and screening pipeline are presented in the format of a standard operating procedure.

  16. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  17. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  18. Technological alternative on environmental management for pipeline installation in the Amazon

    Energy Technology Data Exchange (ETDEWEB)

    Frade, Amadeu Farage; Teixeira, Ivan Jose [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Riquena, Renata Maria; Freitas, Wanderleia Isabel P. de [CONCREMAT, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Usually pipelines construction are located in isolated places which are difficult to access. Due this characteristic the logistical support services are not available as easily as it is in large centers. Even so these enterprises may not release these services mainly due to high demand from stakeholders and the commitment to quality that these pipelines are submitted. This work presents some alternatives in environmental management implemented during an installation of pipelines in the Amazon forest with emphasis on the quality of water bodies and correct effluents destination. Located in western Amazonia in a region with several restrictions like: logistics, low supply of skilled labor and high environmental requirements. The project aligned competence and creativity since from its planning until its delivery to overcome difficulties and meet the demands of stakeholders. Usual techniques to assist legal requirements such as effluent treatment and environmental monitoring had to be adapted to the Amazon reality, always seeking for balance between technical and alignment economic and respect for social and environmental aspects. Using the methodology of 'wetland' (system of alternative treatment of effluents, based on the use of regional plants - macrophytes), the reuse of sludge from sewage treatment station, floating sewage treatment system, was crucial to meet the challenge to deploy this product to work in Amazonia. The aim of this work is to disseminate the techniques used and help other enterprises with the same challenges. (author)

  19. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  20. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.