WorldWideScience

Sample records for pilot project selection

  1. Selecting pilots with crew resource management skills.

    Science.gov (United States)

    Hedge, J W; Bruskiewicz, K T; Borman, W C; Hanson, M A; Logan, K K; Siem, F M

    2000-10-01

    For years, pilot selection has focused primarily on the identification of individuals with superior flying skills and abilities. More recently, the aviation community has become increasingly aware that successful completion of a flight or mission requires not only flying skills but the ability to work well in a crew situation. This project involved development and validation of a crew resource management (CRM) skills test for Air Force transport pilots. A significant relation was found between the CRM skills test and behavior-based ratings of aircraft commander CRM performance, and the implications of these findings for CRM-based selection and training are discussed.

  2. Carbon dioxide cleaning pilot project

    International Nuclear Information System (INIS)

    Knight, L.; Blackman, T.E.

    1994-01-01

    In 1989, radioactive-contaminated metal at the Rocky Flats Plant (RFP) was cleaned using a solvent paint stripper (Methylene chloride). One-third of the radioactive material was able to be recycled; two-thirds went to the scrap pile as low-level mixed waste. In addition, waste solvent solutions also required disposal. Not only was this an inefficient process, it was later prohibited by the Resource Conservation and Recovery Act (RCRA), 40 CFR 268. A better way of doing business was needed. In the search for a solution to this situation, it was decided to study the advantages of using a new technology - pelletized carbon dioxide cleaning. A proof of principle demonstration occurred in December 1990 to test whether such a system could clean radioactive-contaminated metal. The proof of principle demonstration was expanded in June 1992 with a pilot project. The purpose of the pilot project was three fold: (1) to clean metal so that it can satisfy free release criteria for residual radioactive contamination at the Rocky Flats Plant (RFP); (2) to compare two different carbon dioxide cleaning systems; and (3) to determine the cost-effectiveness of decontamination process in a production situation and compare the cost of shipping the metal off site for waste disposal. The pilot project was completed in August 1993. The results of the pilot project were: (1) 90% of those items which were decontaminated, successfully met the free release criteria , (2) the Alpheus Model 250 was selected to be used on plantsite and (3) the break even cost of decontaminating the metal vs shipping the contaminated material offsite for disposal was a cleaning rate of 90 pounds per hour, which was easily achieved

  3. 7 CFR 1955.132 - Pilot projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  4. Pilot project of atomic energy technology record

    International Nuclear Information System (INIS)

    Song, K. C.; Kim, Y. I.; Kim, Y. G.

    2011-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records in each category as a whole summary from the background to the performance at all fields of nuclear science technology which researched and developed at KAERI. This project includes Data and Document Management System(DDMS) that will be the system to collect, organize and preserve various records occurred in each research and development process. To achieve these goals, many problems should be solved to establish technology records process, such as issues about investigation status of technology records in KAERI, understanding and collection records, set-up project system and selection target field, definition standards and range of target records. This is a research report on the arrangement of research contents and results about pilot project which records whole nuclear technology researched and developed at KAERI in each category. Section 2 summarizes the overview of this pilot project and the current status of technology records in domestic and overseas, and from Section 3 to Section 6 summarize contents and results which performed in this project. Section 3 summarizes making TOC(Table of Content) and technology records, Section 4 summarizes sectoral templates, Section 5 summarizes writing detailed plan of technology records, and Section 6 summarizes Standard Document Numbering System(SDNS). Conclusions of this report are described in Section 7

  5. Pilot project as enabler?

    DEFF Research Database (Denmark)

    Neisig, Margit; Glimø, Helle; Holm, Catrine Granzow

    This article deals with a systemic perspective on transition. The field of study addressed is a pilot project as enabler of transition in a highly complex polycentric context. From a Luhmannian systemic approach, a framework is created to understand and address barriers of change occurred using...... pilot projects as enabler of transition. Aspects of how to create trust and deal with distrust during a transition are addressed. The transition in focus is the concept of New Public Management and how it is applied in the management of the Employment Service in Denmark. The transition regards...

  6. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  7. Participatory forest management in Ethiopia: learning from pilot projects.

    Science.gov (United States)

    Ameha, Aklilu; Larsen, H O; Lemenih, Mulugeta

    2014-04-01

    Different arrangements of decentralized forest management have been promoted as alternatives to centralized and top down approaches to halt tropical deforestation and forest degradation. Ethiopia is one of the countries piloting one of these approaches. To inform future programs and projects it is essential to learn from existing pilots and experiences. This paper analyses five of the pilot participatory forest management (PFM) programs undertaken in Ethiopia. The study is based on the Forest User Group (FUG) members' analyses of the programs using selected outcome variables: forest income, change in forest conditions, forest ownership feelings and effectiveness of FUGs as forest managing institutions. These variables were assessed at three points in time-before the introduction of PFM, during the project implementation and after the projects ended. Data were collected using group discussions, key informant interviews and transect walks through the PFM forests. The results show that in all of the five cases the state of the forest is perceived to have improved with the introduction of PFM, and in four of the cases the improvement was maintained after projects ended. Regulated access to the forests following introduction of PFM was not perceived to have affected forest income negatively. There are, however, serious concerns about the institutional effectiveness of the FUGs after projects ended, and this may affect the success of the PFM approach in the longer term.

  8. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  9. Sampling strategy for a large scale indoor radiation survey - a pilot project

    International Nuclear Information System (INIS)

    Strand, T.; Stranden, E.

    1986-01-01

    Optimisation of a stratified random sampling strategy for large scale indoor radiation surveys is discussed. It is based on the results from a small scale pilot project where variances in dose rates within different categories of houses were assessed. By selecting a predetermined precision level for the mean dose rate in a given region, the number of measurements needed can be optimised. The results of a pilot project in Norway are presented together with the development of the final sampling strategy for a planned large scale survey. (author)

  10. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  11. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  12. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Christenson, Norm; Walters, Jerel

    2014-12-31

    This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

  13. The World Center for Computing's Pilot Videodisc Project for French Language Instruction.

    Science.gov (United States)

    Eastmond, J. Nicholls, Jr.; Mosenthal, Richard

    1985-01-01

    Describes a pilot videodisc project for French language instruction. Unique features include (1) learner control of instruction by a mouse or touch-sensitive screen, (2) extensive cultural interaction, and (3) an elaborate lexicon of word meanings portrayed visually for selected key words. (Author/SED)

  14. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Joe Jones; Clive Barton; Mark Clayton; Al Yablonsky; David Legere

    2010-09-30

    This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

  15. Airlie House Pollution Prevention Technology Transfer pilot projects

    Energy Technology Data Exchange (ETDEWEB)

    Thuot, J.R.; Myron, H.; Gatrone, R.; McHenry, J.

    1996-08-01

    The projects were a series of pilot projects developed for DOE with the intention of transferring pollution prevention technology to private industry. The concept was to develop small technology transfer initiatives in partnership with the private sector. Argonne National Laboratory developed three projects: the microscale chemistry in education program, the microscale cost benefit study, and the Bethel New Life recycling trainee program. The two microscale chemistry projects focused on introducing microscale chemistry technologies to secondary and college education. These programs were inexpensive to develop and received excellent evaluations from participants and regulators. The recycle trainee project provided training for two participants and identified recycling and source reduction opportunities in Argonne`s solid waste stream. The pilot projects demonstrated that technology transfer initiatives can be developed and implemented with a small budget and within a short period of time. The essential components of the pilot projects were identification of target technologies that were already available, identification of target audiences, and a focus of effort to achieve a limited but defined objective.

  16. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  17. The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Roberts, A.V.

    1995-01-01

    The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process

  18. Computer Hardware, Advanced Mathematics and Model Physics pilot project final report

    International Nuclear Information System (INIS)

    1992-05-01

    The Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) Program was launched in January, 1990. A principal objective of the program has been to utilize the emerging capabilities of massively parallel scientific computers in the challenge of regional scale predictions of decade-to-century climate change. CHAMMP has already demonstrated the feasibility of achieving a 10,000 fold increase in computational throughput for climate modeling in this decade. What we have also recognized, however, is the need for new algorithms and computer software to capitalize on the radically new computing architectures. This report describes the pilot CHAMMP projects at the DOE National Laboratories and the National Center for Atmospheric Research (NCAR). The pilot projects were selected to identify the principal challenges to CHAMMP and to entrain new scientific computing expertise. The success of some of these projects has aided in the definition of the CHAMMP scientific plan. Many of the papers in this report have been or will be submitted for publication in the open literature. Readers are urged to consult with the authors directly for questions or comments about their papers

  19. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    Science.gov (United States)

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  20. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  1. A pilot project on non-conventional learning

    OpenAIRE

    Fernandes, Sara; Cerone, Antonio; Barbosa, L. S.

    2013-01-01

    This poster presents a pilot project on non-conventional learning strategies based on students’ active participation in real-life FLOSS projects. The aim of the project is to validate the hypothesis that the peer-production model, which underlies most FLOSS projects, can enhance the learning-teaching process based on extensive and systematic collaborative practices.

  2. The Ukrainian pilot project “Stop radon”

    Directory of Open Access Journals (Sweden)

    Pavlenko Tatyana

    2014-01-01

    Full Text Available In 2010 one area of Ukraine (Kirovograd area was selected for a pilot project to reduce radon risks. The project consists of several stages: radon risk training for the public health professionals, measurements of radon concentration in schools and nurseries (more than 1000 buildings were examined, justifications of radon countermeasures and their implementation. The lognormal frequency distribution for equivalent equilibrium concentration was authentically established. The geometric mean of the indoor radon equivalent equilibrium concentration was established to 63 Bq/m3, and standard deviation is equal to 82 Bq/m3. The indoor radon equivalent equilibrium concentration ranged from 22 Bq/m3 to 809 Bq/m3. It was found that the national regulatory limit for this type of buildings was exceeded in more than 50% of the cases. The second phase of the project has a goal to remediate radon levels and reduce radon risks. Calculated exposure doses and radon risk were used to justify the remediation and assess the economic loss for the region caused by radon irradiation of the population.

  3. Macroalgae for CO2 Capture and Renewable Energy - A Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Wiley, Kristine [Gas Technology Inst., Des Plaines, IL (United States)

    2011-01-31

    The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO2) through a technology designed to capture CO2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO2/ NOx flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing

  4. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  5. 76 FR 56272 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-09-12

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... cross-border long-haul trucking pilot program to test and demonstrate the ability of Mexico-domiciled...

  6. 76 FR 56868 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-09-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... proceed with the initiation of a U.S.-Mexico cross-border long-haul trucking pilot program to test and...

  7. 76 FR 73765 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-11-29

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... proceed with the initiation of a U.S.-Mexico cross-border long-haul trucking pilot program to test and...

  8. Electronic Government : Caribbean Pilot Project | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Electronic Government : Caribbean Pilot Project. Caribbean countries are increasingly adopting information and communication technologies (ICTs) in ... The Government of Jamaica is willing to donate the solution to other ... Related content ...

  9. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  10. Los Angeles County Metropolitan Transportation Authority climate change adaptation pilot project report.

    Science.gov (United States)

    2013-08-01

    This Climate Change Adaptation Pilot Project Report details the project background of the recently-completed Los Angeles County : Metropolitan Transportation Authority (Metro) Transit Climate Change Adaptation Pilot Project as well as the various wor...

  11. Scaling the quality of clinical audit projects: a pilot study.

    Science.gov (United States)

    Millard, A D

    1999-06-01

    To pilot the development of a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments, assessing the quality of clinical audit projects, to form a Likert scale. The audit facilitators were based in Scottish health boards and trusts. The participants were audit facilitators known to have over 2 years experience of supporting clinical audit. The response at first test was 11 out of 14 and at the second test it was 27 out of 46. The draft scale was tested by 27 audit facilitators who expressed their strength of agreement or disagreement with each statement for three reports. Validity was assessed by test-re-test, item-total, and total-global indicator correlations. Of the 20 statements, 15 had satisfactory correlations with scale totals. Scale totals had good correlations with global indicators. Test-re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  12. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  13. Execution of pilot tests for an uranium in situ leaching project

    International Nuclear Information System (INIS)

    Koch, H.J.

    1983-01-01

    Urangesellschaft is presently evaluating the technical and economic feasibility of an in situ leaching (ISL) project in Wyoming/USA. This report describes the basic technical principles for ISL-uranium projects and gives the reasons for conducting pilot tests prior to the construction of a commercial plant. It further describes the licensing requirements for an ISL-pilot plant and evaluates the results of the pilot tests. (orig.) [de

  14. Workplace Literacy Pilot Projects: A Discussion Paper = Les Projects-pilotes en alphabetisation en milieu de travail: document de discussion.

    Science.gov (United States)

    de Wolff, Alice

    From 1995-1998, 12 of the 79 organizations funded by Canada's National Literacy Secretariat (NLS) conducted approximately 40 workplace literacy pilot projects across Canada. Those projects were reviewed to determine their effectiveness in increasing the number and quality of Canadian workplace literacy programs. Information for the review was…

  15. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  16. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  17. Next step in policy transitions: Diffusion of pilot projects

    CSIR Research Space (South Africa)

    Vreugdenhil, H

    2009-04-01

    Full Text Available communication across actors and domains, to set the agenda and to streamline resources (Pahl-Wostl, 2006, Pawson and Tilley, 1997). Social and policy learning are realized within the pilot projects. Social learning as one outcome of pilot project.... These ask for new approaches that are first to be tested on a small scale to prevent larger policy flaws and second, are designed to allow the system for remaining adaptable (Pahl-Wostl, 2006; Pawson and Tilley, 1997). Despite these promising...

  18. The ATLAS Level-2 Trigger Pilot Project

    CERN Document Server

    Wickens, F J

    2000-01-01

    The Level-2 Trigger Pilot Project of ATLAS, one of the two general purpose LHC experiments, is part of the on-going programme to develop the ATLAS High Level Triggers (HLT). The Level-2 Trigger will receive events at up to 100 kHz, which has to be reduced to a rate suitable for full event-building of the order of 1 kHz. To reduce the data collection bandwidth and processing power required for the challenging Level-2 task it is planned to use Region of Interest guidance (from Level-1) and sequential processing. The Pilot Project included the construction and use of testbeds of up to 48 processing nodes, development of optimised components and computer simulations of a full system. It has shown how the required performance can be achieved, using largely commodity components and operating systems, and validated an architecture for the Level-2 system. This paper describes the principal achievements and conclusions of this project. (28 refs).

  19. The ATLAS Level-2 Trigger Pilot Project

    CERN Document Server

    Blair, R; Haberichter, W N; Schlereth, J L; Bock, R; Bogaerts, A; Boosten, M; Dobinson, Robert W; Dobson, M; Ellis, Nick; Elsing, M; Giacomini, F; Knezo, E; Martin, B; Shears, T G; Tapprogge, Stefan; Werner, P; Hansen, J R; Wäänänen, A; Korcyl, K; Lokier, J; George, S; Green, B; Strong, J; Clarke, P; Cranfield, R; Crone, G J; Sherwood, P; Wheeler, S; Hughes-Jones, R E; Kolya, S; Mercer, D; Hinkelbein, C; Kornmesser, K; Kugel, A; Männer, R; Müller, M; Sessler, M; Simmler, H; Singpiel, H; Abolins, M; Ermoline, Y; González-Pineiro, B; Hauser, R; Pope, B; Sivoklokov, S Yu; Boterenbrood, H; Jansweijer, P; Kieft, G; Scholte, R; Slopsema, R; Vermeulen, J C; Baines, J T M; Belias, A; Botterill, David R; Middleton, R; Wickens, F J; Falciano, S; Bystrický, J; Calvet, D; Gachelin, O; Huet, M; Le Dû, P; Mandjavidze, I D; Levinson, L; González, S; Wiedenmann, W; Zobernig, H

    2002-01-01

    The Level-2 Trigger Pilot Project of ATLAS, one of the two general purpose LHC experiments, is part of the on-going program to develop the ATLAS high-level triggers (HLT). The Level-2 Trigger will receive events at up to 100 kHz, which has to be reduced to a rate suitable for full event-building of the order of 1 kHz. To reduce the data collection bandwidth and processing power required for the challenging Level-2 task it is planned to use Region of Interest guidance (from Level-1) and sequential processing. The Pilot Project included the construction and use of testbeds of up to 48 processing nodes, development of optimized components and computer simulations of a full system. It has shown how the required performance can be achieved, using largely commodity components and operating systems, and validated an architecture for the Level-2 system. This paper describes the principal achievements and conclusions of this project. (28 refs).

  20. Washington State Need Grant: Less-Than-Halftime Pilot Project (SHB 1345)

    Science.gov (United States)

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    The 2005 Washington State Legislature authorized, through Substitute House Bill 1345, a two-year pilot project allowing eligible students, who enroll for four or five credits in a term, to receive the State Need Grant (SNG). Several important policy considerations emerged during the pilot project. Board staff explored these issues with financial…

  1. The HADES demonstration and pilot project

    International Nuclear Information System (INIS)

    Bruyn, D.de; Meynendonckx, P.; Neerdael, B.; Noynaert, L.; Voet, M.; Volckaert, G.; Bonne, A.

    1988-01-01

    This report deals with the activities of SCK/CEN and its subcontractors performed during the years 1986-87 in the framework of the HADES demonstration and pilot project, which is carried out in the geological Boom clay formation underlying the nuclear research establishment at Mol. This demonstration and pilot project is sponsored by the Commission of the European Communities under contract number Fl1W-004 B (B) in the framework of Part B of the CEC programme on radioactive waste management and disposal. The actions undertaken and reported here deal essentially with design and engineering activities in preparation for the construction of a test drift and of a mine-by-test directly related to this construction test and of a combined irradiation/heating test to be performed later on in this test drift. A time schedule for the various tests planned to be made in the test drift has also been worked out taking into account time and spatial dependencies

  2. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  3. Swiss electricity grid - Benchmarking pilot project

    International Nuclear Information System (INIS)

    2001-01-01

    This article is a short version of the ENET number 210369. This report for the Swiss Federal Office of Energy (SFOE) describes a benchmarking pilot project carried out as a second phase in the development of a formula for the regulation of an open electricity market in Switzerland. It follows on from an initial phase involving the definition of a 'blue print' and a basic concept. The aims of the pilot project - to check out the practicability of the concept - are discussed. The collection of anonymised data for the benchmarking model from over 30 electricity utilities operating on all 7 Swiss grid levels and their integration in the three areas 'Technology', 'Grid Costs' and 'Capital Invested' are discussed in detail. In particular, confidentiality and data protection aspects are looked at. The methods used in the analysis of the data are described and the results of an efficiency analysis of various utilities are presented. The report is concluded with a listing of questions concerning data collection and analysis as well as operational and capital costs that are still to be answered

  4. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  5. Advanced engineering environment pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty (Parametric Technology Corporation, Needham, MA)

    2006-10-01

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

  6. Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-06-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

  7. A Summary of the Technical Pilot Selection Literature

    Science.gov (United States)

    2011-10-01

    Thorndike -Kelly Athletic Interest Inventory ...............................................6 Developing Apparatus-based Pilot Selection Tests—Spring, 1917...chaired by H.E. Burtt, followed by G. Stratton, and finally by E.L. Thorndike (Yerkes, 1919). This committee also included John B. Watson, Warner...World War I was the Mental Alertness Test, which was developed by E.L. Thorndike . Thorndike (1919) realized that success as a military pilot required

  8. Future energy research in the EU under EIT conditions-pilot projects

    Energy Technology Data Exchange (ETDEWEB)

    Puehringer-Oppermann, Franziska; Bele, Petra; Bussar, Rainer; Stimming, Ulrich [TUM, Dept. of Physics, E19, James-Franck Str. 1, D-85748 Garching (Germany)

    2009-07-01

    The European Institute of Innovation and Technology (EIT) has been established in April 2008. It is an independent organisation with the administrative head in Budapest, a governing board, an executive committee and a chairman. The EIT budget until 2012 is 308 MEUR. EIT will operate through the formation of Knowledge and Innovation Communities (KICs). The first three KICs are foreseen in the areas sustainable energy, ICT and climate mitigation. The European Commission has sponsored four pilot projects (conducted 2008-2009) to help develop a suitable governance structure for cooperations on European scale such as the future KICs. They are Bridge, ComplexEIT, SUCCESS and Gast, dealing with different topics like nanomedicine (Bridge), integration of hardware and software (ComplexEIT), sustainable energy (SUCCESS) and green and safe road transportation (Gast). The strategic objective of these pilot projects is to design, implement and test new models of cooperation in the knowledge triangle. We are involved in SUCCESS and after benchmarking of 66 collaborations in the field sustainable energy, the state of the art of selected representative topics was asessed and shortcomings in governance evaluated by SWOT analysis. In parallel further existing collaborations were used to extract and establish a management structure for such collaborations on the European scale.

  9. Pilot Projects in Water Management : Practicing Change and Changing Practice

    NARCIS (Netherlands)

    Vreugdenhil, H.S.I.

    2010-01-01

    Pilot projects are widely applied in water management. They can be used to test risky innovations at confined scale, but can also be used to delay policy decisions or to advocate a particular innovation. In this book the phenomenon ‘pilot project’ is explored both theoretically and empirically. A

  10. 78 FR 35961 - Pilot Project for Tribal Jurisdiction Over Crimes of Domestic Violence

    Science.gov (United States)

    2013-06-14

    ...This notice proposes procedures for an Indian tribe to request designation as a participating tribe under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, pursuant to the voluntary pilot project described in section 908(b)(2) of the Violence Against Women Reauthorization Act of 2013 (``the Pilot Project''), and also proposes procedures for the Attorney General to act on such a request. This notice also invites public comment on the proposed procedures and solicits preliminary expressions of interest from tribes that may wish to participate in the Pilot Project.

  11. 77 FR 12312 - Electronic Submission of Nonclinical Study Data; Notice of Pilot Project

    Science.gov (United States)

    2012-02-29

    ...] Electronic Submission of Nonclinical Study Data; Notice of Pilot Project AGENCY: Food and Drug Administration... and Research (CBER) is announcing an invitation to participate in a pilot evaluation program to test.... Participation in the pilot program is open to all sponsors. The pilot program is intended to provide industry...

  12. US/Brazil joint pilot project objectives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

  13. Simplified pilot module development and testing within the ATLAS PanDA Pilot 2.0 Project

    CERN Document Server

    Drizhuk, Daniil; The ATLAS collaboration; Nilsson, Paul

    2016-01-01

    The Production and Distributed Analysis (PanDA) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at the LHC data processing scale. The PanDA pilot is one of the major components in the PanDA system. It runs on a worker node and takes care of setting up the environment, fetching and pushing data to storage, getting jobs from the PanDA server and executing them. The original PanDA Pilot was designed over 10 years ago and has since then grown organically. Large parts of the original pilot code base are now getting old and are difficult to maintain. Incremental changes and refactoring have been pushed to the limit, and the time is now right for a fresh start, informed by a decade of experience, with the PanDA Pilot 2.0 Project. To create a testing environment for module development and automated unit and functional testing for next generation pilot tasks, a simple pilot version was developed. It resembles the basic workf...

  14. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  15. Objective Versus Subjective Military Pilot Selection Methods in the United States of America

    Science.gov (United States)

    2015-12-14

    a computerized test designed to assess pilot skills by measuring spatial orientation and psychomotor skills and multitasking . The second is the...AFRL-SA-WP-SR-2015-0028 Objective Versus Subjective Military Pilot Selection Methods in the United States of America Joe...September 2014 4. TITLE AND SUBTITLE Objective Versus Subjective Military Pilot Selection Methods in the United States of America 5a. CONTRACT

  16. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Science.gov (United States)

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... motor carriers that applied to participate in the Agency's long-haul pilot program to test and... intent to proceed with the initiation of a United States- Mexico cross-border long-haul trucking pilot...

  17. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  18. Laboratory-based respiratory virus surveillance pilot project on select cruise ships in Alaska, 2013-15.

    Science.gov (United States)

    Rogers, Kimberly B; Roohi, Shahrokh; Uyeki, Timothy M; Montgomery, David; Parker, Jayme; Fowler, Nisha H; Xu, Xiyan; Ingram, Deandra J; Fearey, Donna; Williams, Steve M; Tarling, Grant; Brown, Clive M; Cohen, Nicole J

    2017-09-01

    Influenza outbreaks can occur among passengers and crews during the Alaska summertime cruise season. Ill travellers represent a potential source for introduction of novel or antigenically drifted influenza virus strains to the United States. From May to September 2013-2015, the Alaska Division of Public Health, the Centers for Disease Control and Prevention (CDC), and two cruise lines implemented a laboratory-based public health surveillance project to detect influenza and other respiratory viruses among ill crew members and passengers on select cruise ships in Alaska. Cruise ship medical staff collected 2-3 nasopharyngeal swab specimens per week from passengers and crew members presenting to the ship infirmary with acute respiratory illness (ARI). Specimens were tested for respiratory viruses at the Alaska State Virology Laboratory (ASVL); a subset of specimens positive for influenza virus were sent to CDC for further antigenic characterization. Of 410 nasopharyngeal specimens, 83% tested positive for at least one respiratory virus; 71% tested positive for influenza A or B virus. Antigenic characterization of pilot project specimens identified strains matching predominant circulating seasonal influenza virus strains, which were included in the northern or southern hemisphere influenza vaccines during those years. Results were relatively consistent across age groups, recent travel history, and influenza vaccination status. Onset dates of illness relative to date of boarding differed between northbound (occurring later in the voyage) and southbound (occurring within the first days of the voyage) cruises. The high yield of positive results indicated that influenza was common among passengers and crews sampled with ARI. This finding reinforces the need to bolster influenza prevention and control activities on cruise ships. Laboratory-based influenza surveillance on cruise ships may augment inland influenza surveillance and inform control activities. However, these

  19. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  20. PROJECT MANAGEMENT MATURITY: AN ASSESSMENT OF MATURITY FOR DEVELOPING PILOT PLANTS

    Directory of Open Access Journals (Sweden)

    H.K. Mittermaier

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Despite the current economic climate, the South African mining and engineering industry is experiencing a very promising future, with a large number of capital projects in the offing. It is inevitable that pilot plant development will form part of this future as a risk mitigation technique. This study found that, even though the terms ‘pilot plant’ and ‘project management maturity’ are familiar within the industry, no link between these two could be found in the literature. A number of maturity models exist; and one developed by PMSolutions was selected to perform an assessment of the current level of project management maturity within the South African mining and engineering industry pertaining to the development of pilot plants. The Delphi technique was used to determine the views of experts in the South African mining, mineral processing, petrochemical, nuclear, and mechanical sectors regarding this maturity. A significant difference was observed between the current level of maturity and the required level of maturity in all but one of the nine knowledge areas defined by the Project Management Institute. The two knowledge areas of project time and risk management showed significant differences between current and required maturity levels, and were identified as key areas for improvement.

    AFRIKAANSE OPSOMMING: Ten spyte van die huidige ekonomiese klimaat ondervind die Suid-Afrikaanse mynbou- en ingenieursbedryf ’n baie bemoedigende toekoms, met ’n groot aantal kapitaalprojekte in die vooruitsig. Ten einde risiko’s te verlaag, sal die ontwikkeling van loodsaanlegte noodwendig deel van hierdie toekoms uitmaak. Daar is gevind dat, alhoewel die terme ‘loodsaanleg’ en ‘projekbestuur volwassenheid’ in die nywerheid bekend is, geen skakeling van hierdie twee terme in die literatuur opgespoor kon word nie. ’n Aantal volwassenheid modelle bestaan; en een wat deur PMSolutions ontwikkel is, is gekies om

  1. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  2. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  3. Electrocoagulation project: Pilot study testwork

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Garand, D.K.; Hassan, T.A.; Kar, K.L.; Thind, S.S.

    1991-09-01

    When a suspension or emulsion flows between two sacrificial metal electrodes excited by ac, the dispersed phase is consolidated and then settles. Laboratory-scale investigation of this mechanism, called electrocoagulation, and of its areas of application to water treatment were previously completed and a subsequent project was initiated to design and construct pilot-scale equipment consisting of an electrocoagulation cell, power supply, and computerized control system. The constructed pilot plant was used to test the effectiveness of electrocoagulation to clarify coal processing plant effluent. Results obtained with clay suspensions showed that flow conditions in the cell have a major effect on electric power consumption, and a reduction by a factor of three on this crucial cost parameter appeared possible compared to a previously tested batch-scale electrocoagulation system. Results obtained using the coal plant thickener feed closely duplicated those obtained with the clay mixtures. Aluminum electrode consumption, however, remained unchanged compared to the bench-scale tests. Supernatant clarity far exceeded requirements, while settling rate was too low. The settling could be speeded up by appropriate use of chemicals, but such addition affects the coagulation mechanism and reduces supernatant clarity. A tradeoff between settling rate and clarity was thus established. The total cost of treatment was deemed to be in excess of coal company requirements, but the pilot tests revealed much about the electrocoagulation system under continuous flow conditions. The technology is seen as having application in other areas such as municipal and industrial waste treatment. 22 refs., 6 figs., 2 tabs.

  4. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  5. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  6. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  7. Navigating Bioethical Waters: Two Pilot Projects in Problem-Based Learning for Future Bioscience and Biotechnology Professionals.

    Science.gov (United States)

    Berry, Roberta M; Levine, Aaron D; Kirkman, Robert; Blake, Laura Palucki; Drake, Matthew

    2016-12-01

    We believe that the professional responsibility of bioscience and biotechnology professionals includes a social responsibility to contribute to the resolution of ethically fraught policy problems generated by their work. It follows that educators have a professional responsibility to prepare future professionals to discharge this responsibility. This essay discusses two pilot projects in ethics pedagogy focused on particularly challenging policy problems, which we call "fractious problems". The projects aimed to advance future professionals' acquisition of "fractious problem navigational" skills, a set of skills designed to enable broad and deep understanding of fractious problems and the design of good policy resolutions for them. A secondary objective was to enhance future professionals' motivation to apply these skills to help their communities resolve these problems. The projects employed "problem based learning" courses to advance these learning objectives. A new assessment instrument, "Skills for Science/Engineering Ethics Test" (SkillSET), was designed and administered to measure the success of the courses in doing so. This essay first discusses the rationale for the pilot projects, and then describes the design of the pilot courses and presents the results of our assessment using SkillSET in the first pilot project and the revised SkillSET 2.0 in the second pilot project. The essay concludes with discussion of observations and results.

  8. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive

  9. A pilot project to improve access to telepsychotherapy at rural clinics.

    Science.gov (United States)

    Adler, Geri; Pritchett, Lonique R; Kauth, Michael R; Nadorff, Danielle

    2014-01-01

    The U.S. Department of Veterans Affairs (VA) has pioneered telemental health (TMH) with over 500,000 TMH encounters over the past decade. VA community-based outpatient clinics were established to improve accessibility of mental healthcare for rural Veterans. Despite these clinics clinics and increased availability of TMH, many rural Veterans have difficulty receiving mental healthcare, particularly psychotherapy. Twelve therapists participated in a pilot project using TMH technologies to improve mental healthcare service delivery to rural Veterans treated at six community clinics. Therapists completed online training, and study staff communicated with them monthly and clinical leaders every other month. Therapists completed two questionnaires: before training and 10 months later. This article describes barriers and facilitators to the implementation of the project, as well as therapists' knowledge, confidence, and motivation regarding TMH. Two clinicians were offering telepsychotherapy after 10 months. At all six sites, unanticipated organizational constraints and administrative barriers delayed implementation; establishing organizational practices and therapists' motivation helped facilitate the process. Adopters of the project reported more positive views of the modality and did not worry about staffing, a concern of nonadopters. Despite barriers to implementation, lessons learned from this pilot project have led to improvements and changes in TMH processes. Results from the pilot showed that therapists providing telepsychotherapy had increased confidence, knowledge, and motivation. As TMH continues to expand, formalized decision-making with clinical leaders regarding project goals, better matching of therapists with this modality, and assessment of medical center and clinic readiness are recommended.

  10. The seed of change in society. Diffusion of solar cell systems in housing by means of pilot projects

    International Nuclear Information System (INIS)

    Van Mierlo, B.C.

    2002-01-01

    The central question in this thesis is: in what way can pilot projects contribute to the diffusion of new sustainable technologies, in particular solar cell systems in housing units. The reason for this is, in the first place, that trials, demonstration projects, practical experiments and market introduction projects are often launched by firms and subsidised by the state. The objective of such projects, referred to here as pilot projects, is in general to prepare the market introduction of new technologies. However, these projects are often realised and financed without much information being available on how they operate: about how they could prepare the market launch and how this function could be optimised. The second reason is that since the end of the 1980s the expectations in the Netherlands in respect of solar cell systems (PV systems) connected to the electricity grid have been high. These systems could have great advantages for the environment and after 2010 could be the most important source of sustainable energy. The government sees housing as the most promising market segment for these systems. It is recognised that certain major bottlenecks have to be solved before a large-scale diffusion is possible. According to the niche approach, the basic starting point of this thesis, this means that the existing social-technological regime needs to change: the rules and infrastructure according to which the existing technologies are, as it were, considered self-evident, and which hinder the introduction of new technologies. Subsidised pilot projects form a protected market niche that can stimulate a change in the regime by learning and by the social embedding of the learning experiences. According to this approach, a protected market niche is a necessary component of state-supported innovation policy if market niches do not arise spontaneously. It is, however, a limited instrument since the ultimate impact on existing regimes depends mainly on external factors

  11. Smart City pilot projects : exploring the dimensions and conditions of scaling up

    NARCIS (Netherlands)

    van Winden, W.; van den Buuse, D.J.H.M.

    2017-01-01

    In many cities, pilot projects are set up to test new technologies that help to address urban sustainability issues, improve the effectiveness of urban services, and enhance the quality of life of citizens. These projects, often labelled as “smart city” projects, are typically supported by

  12. Smart city pilot projects, scaling up or fading out? : Experiences from Amsterdam

    NARCIS (Netherlands)

    van Winden, W.

    2016-01-01

    In many cities, pilot projects are set up to test or develop new technologies that improve sustainability, urban quality of life or urban services (often labelled as “smart city” projects). Typically, these projects are supported by the municipality, funded by subsidies, and run in partnerships.

  13. Influencing citizen behavior: experiences from multichannel marketing pilot projects

    NARCIS (Netherlands)

    van de Wijngaert, Lidwien; Pieterson, Willem Jan; Teerling, Marije L.

    2011-01-01

    Information technology allows national and local governments to satisfy the needs of citizens in a cost effective way. Unfortunately, citizens still tend to prefer traditional, more costly channels, such as the front desk, phone and mail. Through pilot projects government agencies attempt to

  14. Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report

    International Nuclear Information System (INIS)

    Johansen, R.

    2011-01-01

    Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

  15. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects.

    Science.gov (United States)

    Kreps, Gary L

    2005-10-01

    This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations.

  16. Technology Cooperation Agreement Pilot Project (TCAPP)

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.; Benioff, R.

    1999-10-20

    The Technology Cooperation Agreement Pilot Project (TCAPP) is helping developing countries design and implement actions to attract investment in clean energy technologies that will meet their economic development goals, while mitigating greenhouse gas emissions. TCAPP was launched by three US government agencies -- the US Agency for International Development (USAID), the US Environmental Protection Agency (USEPA), and the US Department of Energy (USDOE) -- in August 1997 to establish a model for climate change technology cooperation with developing and transition countries. This report describes the TCAPP approach and the significant progress made by the participating countries.

  17. The NCI Digital Divide Pilot Projects: implications for cancer education.

    Science.gov (United States)

    Kreps, Gary L; Gustafson, David; Salovey, Peter; Perocchia, Rosemarie Slevin; Wilbright, Wayne; Bright, Mary Anne; Muha, Cathy

    2007-01-01

    The National Cancer Institute (NCI) supported four innovative demonstration research projects, "The Digital Divide Pilot Projects," to test new strategies for disseminating health information via computer to vulnerable consumers. These projects involved active research collaborations between the NCI's Cancer Information Service (CIS) and regional cancer control researchers to field test new approaches for enhancing cancer communication in vulnerable communities. The projects were able to use computers to successfully disseminate relevant cancer information to vulnerable populations. These demonstration research projects suggested effective new strategies for using communication technologies to educate underserved populations about cancer prevention, control, and care.

  18. Connecticut warm mix asphalt (WMA) pilot projects 2010 and 2011.

    Science.gov (United States)

    2014-06-01

    WMA overlays were placed in several pilot projects in Connecticut during the 2010 and 2011 construction : seasons. These technologies included Sasobit, Evotherm, Advera, Double-Barrel Green foamed : asphalt as well as SonneWarmix. The res...

  19. Oregon department of transportation small business group twice-monthly payments pilot project : summary report.

    Science.gov (United States)

    2008-07-01

    Oregon Department of Transportation (ODOT) recently completed a pilot study on small business payment practices. In the study, three pilot projects were tested where payments to small business contractors were changed from a monthly payment to twice-...

  20. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects*

    Science.gov (United States)

    Kreps, Gary L.

    2005-01-01

    Objective: This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. Method: The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. Results: The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. Implications: The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations. PMID:16239960

  1. Evaluation of transversal competencies: pilot project in a maths course for first-year business

    OpenAIRE

    Bosch Príncep, Manuela; Morillo, Isabel

    2013-01-01

    The aim of this communication is to describe the results of a pilot project for the assessment of the transversal competency "the capacity for learning and responsibility". This competency is centred on the capacity for the analysis, synthesis, overview, and practical application of newly acquired knowledge. It is proposed by the University of Barcelona in its undergraduate degree courses, through multidisciplinary teaching teams. The goal of the pilot project is to evaluate this competenc...

  2. Lessons Learned From the Environmental Public Health Tracking Sub-County Data Pilot Project.

    Science.gov (United States)

    Werner, Angela K; Strosnider, Heather; Kassinger, Craig; Shin, Mikyong

    2017-12-07

    Small area data are key to better understanding the complex relationships between environmental health, health outcomes, and risk factors at a local level. In 2014, the Centers for Disease Control and Prevention's National Environmental Public Health Tracking Program (Tracking Program) conducted the Sub-County Data Pilot Project with grantees to consider integration of sub-county data into the National Environmental Public Health Tracking Network (Tracking Network). The Tracking Program and grantees developed sub-county-level data for several data sets during this pilot project, working to standardize processes for submitting data and creating required geographies. Grantees documented challenges they encountered during the pilot project and documented decisions. This article covers the challenges revealed during the project. It includes insights into geocoding, aggregation, population estimates, and data stability and provides recommendations for moving forward. National standards for generating, analyzing, and sharing sub-county data should be established to build a system of sub-county data that allow for comparison of outcomes, geographies, and time. Increasing the availability and accessibility of small area data will not only enhance the Tracking Network's capabilities but also contribute to an improved understanding of environmental health and informed decision making at a local level.

  3. Advanced Instrumentation, Information and Control (II and C) Research and Development Facility Buildout and Project Execution of LWRS II and C Pilot Projects 1 and 3

    International Nuclear Information System (INIS)

    Farris, Ronald; Oxstrand, Johanna; Weatherby, Gregory

    2011-01-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II and C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II and C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results

  4. WIPP: Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of the Waste Isolation Pilot Plant are discussed briefly: history and site selection; salt as a disposal medium; transporting waste materials; early key events; impacts on New Mexico; project organization; and site certification profile

  5. Advanced Engineering Environment FY09/10 pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  6. Reflections on a Coaching Pilot Project in Healthcare Settings

    Science.gov (United States)

    Gurbutt, D. J.; Gurbutt, R.

    2016-01-01

    This paper draws on personal reflection of coaching experiences and learning as a coach to consider the relevance of these approaches in a management context with a group of four healthcare staff who participated in a pilot coaching project. It explores their understanding of coaching techniques applied in management settings via their reflections…

  7. Live Storybook Outcomes of Pilot Multidisciplinary Elementary Earth Science Collaborative Project

    Science.gov (United States)

    Soeffing, C.; Pierson, R.

    2017-12-01

    Live Storybook Outcomes of pilot multidisciplinary elementary earth science collaborative project Anchoring phenomena leading to student led investigations are key to applying the NGSS standards in the classroom. This project employs the GLOBE elementary storybook, Discoveries at Willow Creek, as an inspiration and operational framework for a collaborative pilot project engaging 4th grade students in asking questions, collecting relevant data, and using analytical tools to document and understand natural phenomena. The Institute of Global Environmental Strategies (IGES), a GLOBE Partner, the Outdoor Campus, an informal educational outdoor learning facility managed by South Dakota Game, Fish and Parks, University of Sioux Falls, and All City Elementary, Sioux Falls are collaborating partners in this project. The Discoveries at Willow Creek storyline introduces young students to the scientific process, and models how they can apply science and engineering practices (SEPs) to discover and understand the Earth system in which they live. One innovation associated with this project is the formal engagement of elementary students in a global citizen science program (for all ages), GLOBE Observer, and engaging them in data collection using GLOBE Observer's Cloud and Mosquito Habitat Mapper apps. As modeled by the fictional students from Willow Creek, the 4th grade students will identify their 3 study sites at the Outdoor Campus, keep a journal, and record observations. The students will repeat their investigations at the Outdoor Campus to document and track change over time. Students will be introduced to "big data" in a manageable way, as they see their observations populate GLOBE's map-based data visualization and . Our research design recognizes the comfort and familiarity factor of literacy activities in the elementary classroom for students and teachers alike, and postulates that connecting a science education project to an engaging storybook text will contribute to a

  8. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    Science.gov (United States)

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural

  9. Pilot project - Promoting protection of the right to housing

    DEFF Research Database (Denmark)

    This study was undertaken for the European Commission Directorate-General for Employment, Social Affairs & Inclusion as part of the ‘Promoting protection of the right to housing - Homelessness prevention in the context of evictions’ pilot project. The key objectives of the research were: - to pro......This study was undertaken for the European Commission Directorate-General for Employment, Social Affairs & Inclusion as part of the ‘Promoting protection of the right to housing - Homelessness prevention in the context of evictions’ pilot project. The key objectives of the research were......: - to provide an overview and analysis of available data and trends regarding housing evictions between 2010 and 2013 across the 28 EU Member States; - to establish the reasons for and impacts of eviction, in particular the relative importance of eviction as a pathway into homelessness; - to analyse...... the legislative and regulatory framework and the availability, effectiveness and cost-efficiency of measures designed to prevent and tackle evictions and enable early interventions; - to suggest ways to improve data collection and the monitoring of evictions in the Member States, identifying the most important...

  10. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    Science.gov (United States)

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  11. Recycling entire DOE facilities: The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Floyd, D.R.

    1996-01-01

    The Mission of the National Conversion Pilot Project - to demonstrate, at the Rocky Flats Site, the feasibility of economic conversion of DOE Sites - is succeeding. Contaminated facilities worth $92 million are being cleaned and readied for reuse by commercial industry to manufacture products needed in the DOE cleanup and elsewhere. Former Rocky Flats workers have been hired, recultured, are conducting the cleanup and are expected to perform the future manufacturing by recycling DOE RSM and other metals requiring special environmental controls. Stakeholder sway over project activities is welcome and strong

  12. A computer graphics pilot project - Spacecraft mission support with an interactive graphics workstation

    Science.gov (United States)

    Hagedorn, John; Ehrner, Marie-Jacqueline; Reese, Jodi; Chang, Kan; Tseng, Irene

    1986-01-01

    The NASA Computer Graphics Pilot Project was undertaken to enhance the quality control, productivity and efficiency of mission support operations at the Goddard Operations Support Computing Facility. The Project evolved into a set of demonstration programs for graphics intensive simulated control room operations, particularly in connection with the complex space missions that began in the 1980s. Complex mission mean more data. Graphic displays are a means to reduce the probabilities of operator errors. Workstations were selected with 1024 x 768 pixel color displays controlled by a custom VLSI chip coupled to an MC68010 chip running UNIX within a shell that permits operations through the medium of mouse-accessed pulldown window menus. The distributed workstations run off a host NAS 8040 computer. Applications of the system for tracking spacecraft orbits and monitoring Shuttle payload handling illustrate the system capabilities, noting the built-in capabilities of shifting the point of view and rotating and zooming in on three-dimensional views of spacecraft.

  13. Developing collaborative person-centred practice: a pilot project on a palliative care unit.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Gravelle, Debbie; Thibault, Hélène

    2007-02-01

    Maximizing interprofessional collaborative patient-centred practice holds promise for improving patient care and creating satisfying work roles. In Canada's evolving health care system, there are demands for increased efficiency, cost-effectiveness, and quality improvement. Interprofessional collaboration warrants re-examination because maximizing interprofessional collaboration, especially nurse-physician collaboration, holds promise for improving patient care and creating satisfying work roles. A palliative care team seized the opportunity to pilot a different approach to patient and family care when faced with a reduction in medical staff. Grounded in a collaborative patient-centred practice approach, the Canadian Hospice Palliative Care Association's National Model to Guide Hospice Palliative Care (2002), and outcomes from program retreats and workgroups, a collaborative person-centred model of care was developed for a 12-bed pilot project. Preliminary findings show that the pilot project team perceived some specific benefits in continuity of care and interprofessional collaboration, while the presence of the physician was reduced to an average of 3.82 hours on the pilot wing, compared with 8 hours on the non-pilot wings. This pilot study suggests that a person-centred model, when focused on the physician-nurse dyad, may offer improved efficiency, job satisfaction and continuity of care on a palliative care unit. Incorporating all team members and developing strategies to successfully expand the model across the whole unit are the next challenges. Further research into the impact of these changes on the health care professionals, management and patients and families is essential.

  14. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  15. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  16. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  17. The national conversion pilot project

    International Nuclear Information System (INIS)

    Van Der Puy, M.; Francis, G.; Konczal, M.

    1994-01-01

    The Department of Energy is now faced with the prospect of terminating traditional defense production missions at several Department of Energy sites. Because of this, there is a critical need to develop a DOE process to convert former defense production facilities to private use so that underutilized workers and facilities may be used to minimize the impact on the United States economy. The purpose of the National Conversation Pilot Project (NCPP) at Rocky Flats near Denver, Colorado is to explore and demonstrate the feasibility of economic conversion of DOE facilities, in a manner consistent with ongoing site waste management and cleanup activities, and non-prejudicial to future land use planning decisions. The NCPP is divided into three stages: The first stage, now under way, is one of detailed planning for cleanup and building maintenance activities. The second stage involves building cleanup necessary to support the proposed industrial activities, maintenance of equipment and building infrastructure necessary to assure protection of human health and the environment, declassification work, and some small scale research and development activities. Stage III would involve DOE metals recycling. Specific approval from the DOE is required prior to each project stage. To ensure stakeholder involvement, a steering committee will advise the DOE on the desirability to proceed with the project from stage to stage. A key question in the conversion process is whether a competitive economic and regulatory environment can be created on a DOE facility, allowing an onsite conversion business to effectively compete with offsite businesses. If successful, the Rocky Flats project could become the model for economic conversion at other DOE facilities

  18. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  19. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  20. Bio-Manufacturing to market pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Dressen, Tiffaney [Univ. of California, Berkeley, CA (United States)

    2017-09-25

    The Bio-Manufacturing to Market pilot project was a part of the AMJIAC, the Advanced Manufacturing Jobs and Innovation Accelerator Challenge grant. This internship program set out to further define and enhance the talent pipeline from the University and local Community Colleges to startup culture in East Bay Area, provide undergraduate STEM students with opportunities outside academia, and provide startup companies with much needed talent. Over the 4 year period of performance, the Bio-Manufacturing to Market internship program sponsored 75 undergraduate STEM students who were able to spend anywhere from one to six semesters working with local Bay Area startup companies and DOE sponsored facilities/programs in the biotech, bio-manufacturing, and biomedical device fields.

  1. Manitoba Motor Dealers Association pilot project : final report

    International Nuclear Information System (INIS)

    2006-08-01

    This report described a 3-month pilot project conducted by EnerGuide for Vehicles in collaboration with the Manitoba Motor Dealers Association (MMDA) to increase dealership and consumer awareness of vehicle impacts on climate change. The project also aimed to engage MMDA's members in helping to promote and distribute information on fuel efficient vehicles and fuel efficient driving habits. Program tools in both the dealership showroom as well as service areas were used. Objectives of the project also included gaining public opinion research (POR) information regarding the impact of program tools; gaining feedback from new car dealers regarding the success of the project; gauging customer perceptions of the importance of fuel efficiency when selecting a new vehicle; determining whether or not drivers verify tire pressure on their vehicles; determining whether or not drivers incorporate energy efficient driving habits; and gauging customer perceptions regarding the importance of incorporating behaviours to improve fuel efficiency. The study used a mixed methodology of online and telephone surveys. A total of 41 dealerships participated in the project. The final sample of surveys consisted of 1926 customer records. The total overall number of completed interviews was 463. Results indicated that most dealers believed the campaign was a success, and that staff and customers learned about energy efficiency as a result of the campaign. Seventy-five per cent of dealers agreed that they would participate in future energy efficiency programs. Campaign materials and customer incentives were widely viewed as successful in raising awareness. Seven in 10 dealership customers recalled at least 1 of the promotional endeavours, and a large majority of customers indicated the information they saw at the dealership encouraged them to consider fuel efficiency when buying or maintaining a vehicle in the future. The majority of new customers considered fuel consumption to be the second

  2. Department of Energy Operation Quality Assurance Program for the Waste Isolation Pilot Plant (WIPP) Project (Carlsbad, New Mexico)

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of this plan is to describe the Quality Assurance (QA)reverse arrow Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Project Participants: the Scientific Advisor (Sandia National Laboratory) and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the Pre-Operational and Operational phases of the WIPP Project not addressed under the construction phase. This plan also requires the QA Programs for DOE and Project Participants to be structured so as to comply with this plan and ANSI-ASME NQA-1. The prime responsibility for Operational Quality Assurance rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Scientific Advisor and the Management and Operating Contractor. Overviews of selected operational and testing activities will be are conducted in accordance with prescribed requirements and that adequate documentation of these activities is maintained. 4 figs

  3. A European Seal of Approval for 'gay' businesses: findings from an HIV-prevention pilot project.

    Science.gov (United States)

    Sherriff, Nigel; Gugglberger, Lisa

    2014-05-01

    'Gay' businesses can be important settings through which to deliver health promotion interventions to vulnerable populations, such as men who have sex with men (MSM) regarding HIV prevention. This article draws on data from the European Everywhere project, which represents the first scheme to develop and pre-test a common framework for HIV/STI prevention in 'gay' businesses across eight European countries. The scientific basis of the Everywhere framework was developed using a comprehensive consensus-building process over 30 months. This process included: formative scoping research; interviews with 54 'gay' businesses; meetings/workshops with representatives from project partners, 'gay' businesses, public health administrations and external experts; 15 interviews and three focus groups with project partners; a five-month pilot action phase in eight countries, together with support from the project's Advisory Group; and all Everywhere project partners including the Scientific Steering Committee. A voluntary European code setting out differentiated HIV/STI-prevention standards for 'gay' businesses (including sex venues, 'gay' and 'gay' friendly social spaces, travel agencies, hotels, dating websites) was developed and piloted in eight European cities. During a five-month pilot action, 83 'gay' businesses were certified with the Everywhere Seal of Approval representing a considerable increase on the expected pilot target of 30. Everywhere offers a major contribution to the public health and/or health promotion field in the form of a practical, policy-relevant, settings-based HIV-prevention framework for 'gay' businesses that is common across eight European countries. Findings suggest that a European-wide model of prevention is acceptable and feasible to businesses.

  4. QR Codes in the Library: Are They Worth the Effort? Analysis of a QR Code Pilot Project

    OpenAIRE

    Wilson, Andrew M.

    2012-01-01

    The literature is filled with potential uses for Quick Response (QR) codes in the library. Setting, but few library QR code projects have publicized usage statistics. A pilot project carried out in the Eda Kuhn Loeb Music Library of the Harvard College Library sought to determine whether library patrons actually understand and use QR codes. Results and analysis of the pilot project are provided, attempting to answer the question as to whether QR codes are worth the effort for libraries.

  5. Evaluation of the midwifery pilot projects in Quebec: an overview. L'Equipe d'Evaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Blais, R; Joubert, P

    2000-01-01

    In 1990, the province of Quebec adopted a law authorizing the evaluation of the practice of midwifery through eight pilot projects. The projects, which took the form of birth centres outside hospitals, started operating in 1994. The objectives of the evaluation were 1) to compare midwives' services to current physician services with regard to maternal and neonatal mortality and morbidity, the use of obstetrical intervention, individualization and continuity of care as perceived by clients, and cost; and 2) to identify the professional and organizational factors associated with the integration of midwives into the health care system. A mixed evaluative design was used: a multiple case study with each pilot project representing a case and a cohort study where 1,000 women followed by midwives in the birth centres were matched with 1,000 women followed by physicians in the usual hospital-based services. Various quantitative and qualitative data collection instruments were used. Overall, many results were favourable to midwifery practice, while some were favourable to medical care. Following the evaluation, the Government of Quebec decided to legalize the practice of midwifery.

  6. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  7. The ESA Space Weather Applications Pilot Project

    Science.gov (United States)

    Glover, A.; Hilgers, A.; Daly, E.

    Following the completion in 2001 of two parallel studies to consider the feasibility of a European Space Weather Programme ESA embarked upon a space weather pilot study with the goal of prototyping European space weather services and assessing the overall market for such within Europe This pilot project centred on a number of targeted service development activities supported by a common infrastructure and making use of only existing space weather assets Each service activity included clear participation from at least one identified service user who was requested to provide initial requirements and regular feedback during the operational phase of the service These service activities are now reaching the end of their 2-year development and testing phase and are now accessible each with an element of the service in the public domain see http www esa-spaceweathet net swenet An additional crucial element of the study was the inclusion of a comprehensive and independent analysis of the benefits both economic and strategic of embarking on a programme which would include the deployment of an infrastructure with space-based elements The results of this study will be reported together with their implication for future coordinated European activities in this field

  8. Nuclear employee data system (NEDS), a pilot project

    International Nuclear Information System (INIS)

    Britz, W.L.

    1984-01-01

    This paper describes a pilot project being funded by six east coast nuclear utilities: the Nuclear Employee Data System (NEDS). The NEDS is to be a customized computer-based information management system that will receive, update, and maintain in-processing information among the NEDS participating utilities. A comprehensive set of data requirements has been preliminarily identified and characterized into areas of: personal information, security information, health physics information, respiratory protective equipment information, medical information, and training information. The NEDS is expected to become operational next summer

  9. Statistical projection effects in a hydrodynamic pilot-wave system

    Science.gov (United States)

    Sáenz, Pedro J.; Cristea-Platon, Tudor; Bush, John W. M.

    2018-03-01

    Millimetric liquid droplets can walk across the surface of a vibrating fluid bath, self-propelled through a resonant interaction with their own guiding or `pilot' wave fields. These walking droplets, or `walkers', exhibit several features previously thought to be peculiar to the microscopic, quantum realm. In particular, walkers confined to circular corrals manifest a wave-like statistical behaviour reminiscent of that of electrons in quantum corrals. Here we demonstrate that localized topological inhomogeneities in an elliptical corral may lead to resonant projection effects in the walker's statistics similar to those reported in quantum corrals. Specifically, we show that a submerged circular well may drive the walker to excite specific eigenmodes in the bath that result in drastic changes in the particle's statistical behaviour. The well tends to attract the walker, leading to a local peak in the walker's position histogram. By placing the well at one of the foci, a mode with maxima near the foci is preferentially excited, leading to a projection effect in the walker's position histogram towards the empty focus, an effect strongly reminiscent of the quantum mirage. Finally, we demonstrate that the mean pilot-wave field has the same form as the histogram describing the walker's statistics.

  10. Uncertainty-handling assessment using nondeterministic learning tasks in pilot selection

    OpenAIRE

    Matton , Nadine; Raufaste , Éric; Vautier , Stéphane

    2008-01-01

    International audience; This paper addresses selection for entry into the French commercial pilot ab initio training, namely the ENAC (École Nationale de l'Aviation Civile). Applicants are mainly (more than 80%) coming from scientific preparatory classes for competitive admission to the "Grandes Écoles". Therefore these applicants are hand-picked based on their school grades in mathematics and physics. To give a hint, in 2005, only 15% of the French GCE A-Level students were selected for entr...

  11. A pilot project: Antioch Delta Cove, Antioch, California

    International Nuclear Information System (INIS)

    Minder, M.

    1994-01-01

    The project involves the restoration of the Hickmott cannery site, comprising approximately 15 acres (three five acre parcels) located on the Delta in inter-city Antioch. Hickmott Foods, Inc., operated a fruit and vegetable cannery between 1905 and the early 1970's, during which time tomato skins, peach and apricot pits, and asparagus butts were discharged on the site. The decaying fruit pits have caused cyanide contamination. Additionally, the site contains some petroleum hydrocarbon contamination as well as gypsum board contamination, apparently from nearby manufacturing operations. The Antioch Delta Cove Pilot shows how interested parties can work together to clean up contaminated sites and use the clean up process to stimulate technology transfer. The Antioch project is a blueprint that can be replicated at other sites across California

  12. National Land Imaging Requirements (NLIR) Pilot Project summary report: summary of moderate resolution imaging user requirements

    Science.gov (United States)

    Vadnais, Carolyn; Stensaas, Gregory

    2014-01-01

    Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only

  13. Study on designing a complete pilot plant for processing sandstone ores in Palua-Parong area

    International Nuclear Information System (INIS)

    Le Quang Thai; Tran Van Son; Tran The Dinh; Trinh Nguyen Quynh; Vu Khac Tuan

    2015-01-01

    Design work is the first step of the construction and operation of pilot plant. Thus, the project Study on designing a complete pilot plant for processing sandstone ores in Palua - Parong area was conducted to design a pilot plant for testing entire technological process to obtain yellowcake. Based on a literature review of uranium ore processing technology in the world, information of ore and previous research results of uranium ore in PaLua - PaRong area at the Institute for Technology of Radioactive and Rare Elements, a suitable technological flowsheet for processing this ore has been selected. The size, location of the pilot plant and planed experiments has been selected during the implementation of this project, in which basic parameters, designed system of equipment, buildings, ect. were also calculated. (author)

  14. Smooth Transition for Advancement to Graduate Education (STAGE) for Underrepresented Groups in the Mathematical Sciences Pilot Project: Broadening Participation through Mentoring

    Science.gov (United States)

    Eubanks-Turner, Christina; Beaulieu, Patricia; Pal, Nabendu

    2018-01-01

    The Smooth Transition for Advancement to Graduate Education (STAGE) project was a three-year pilot project designed to mentor undergraduate students primarily from under-represented groups in the mathematical sciences. The STAGE pilot project focused on mentoring students as they transitioned from undergraduate education to either graduate school…

  15. Condensed listing of surface boreholes at the Waste Isolation Pilot Plant Project through 31 December 1995

    International Nuclear Information System (INIS)

    Hill, L.R.; Aguilar, R.; Mercer, J.W.; Newman, G.

    1997-01-01

    This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreholes drilled for the purpose of site selection and characterization through 31 December 1995. The US Department of Energy (DOE) sponsored the drilling activities, which were conducted primarily by Sandia National Laboratories. The listing provides physical attributes such as location (township, range, section, and state-plane coordinates), elevation, and total borehole depth, as well as the purpose for the borehole, drilling dates, and information about extracted cores. The report also presents the hole status (plugged, testing, monitoring, etc.) and includes salient findings and references. Maps with borehole locations and times-of-drilling charts are included

  16. Pilot Implementations

    DEFF Research Database (Denmark)

    Manikas, Maria Ie

    by conducting a literature review. The concept of pilot implementation, although commonly used in practice, is rather disregarded in research. In the literature, pilot implementations are mainly treated as secondary to the learning outcomes and are presented as merely a means to acquire knowledge about a given...... objective. The prevalent understanding is that pilot implementations are an ISD technique that extends prototyping from the lab and into test during real use. Another perception is that pilot implementations are a project multiple of co-existing enactments of the pilot implementation. From this perspective......This PhD dissertation engages in the study of pilot (system) implementation. In the field of information systems, pilot implementations are commissioned as a way to learn from real use of a pilot system with real data, by real users during an information systems development (ISD) project and before...

  17. Convergent and divergent learning in photovoltaic pilot projects and subsequent niche development

    NARCIS (Netherlands)

    Mierlo, van B.

    2012-01-01

    A proposed strategy to facilitate the use and development of radical new sustainable technologies is the creation of niches. Learning in these niches and the social embedding of learning experiences can stimulate changes in existing sociotechnological regimes. Pilot projects in which new

  18. Developing Collections With Get It Now: A Pilot Project for a Hybrid Collection.

    Science.gov (United States)

    Hendler, Gail Y; Gudenas, Jean

    2016-01-01

    As health sciences libraries transition from print to online journal collections that require significant institutional funding, librarians are investigating the use of on demand services in order to meet customer need and contain costs. In 2014 a three-year pilot project to determine if unmediated access to the Copyright Clearance Center's Get It Now service would expand access to needed content and provide usage data to inform collections decision making. The service provides rapid, automated delivery of unsubscribed, high-quality journal articles directly to the customer. The three-year pilot project aims to compare the cost of Get It Now to the traditional subscription model to learn if the service is a cost-effective and sustainable alternative that improves customer satisfaction and that can transform collection development with a hybrid model for journal acquisitions.

  19. Implementing learnerships: learner recruitment and selection B ...

    African Journals Online (AJOL)

    Implementing learnerships: learner recruitment and selection B lessons learnt from the KwaZulu-Natal pilot projects. ... 2001 in KwaZulu-Natal, with specific reference to the recruitment and selection of learners. ... AJOL African Journals Online.

  20. Holistic assessment of a landfill mining pilot project in Austria: Methodology and application.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Wolfsberger, Tanja; Ragossnig, Arne; Pomberger, Roland

    2016-07-01

    Basic technical and economic examinations of Austrian mass waste landfills, concerning the recovery of secondary raw materials, have been carried out by the 'LAMIS - Landfill Mining Austria' pilot project for the first time in Austria. A main focus of the research - the subject of this article - was the first devotion of a pilot landfill to an integrated ecological and economic assessment so that its feasibility could be verified before a landfill mining project commenced. A Styrian mass waste landfill had been chosen for this purpose that had been put into operation in 1979 and received mechanically-biologically pre-treated municipal waste till 2012. The whole assessment procedure was divided into preliminary and main assessment phases to evaluate the general suitability of a landfill mining project with little financial and human resource expense. A portfolio chart, based on a questionnaire, was created for the preliminary assessment that, as a result, has provided a recommendation for subsequent investigation - the main assessment phase. In this case, specific economic criteria were assessed by net present value calculation, while ecological or socio-economic criteria were rated by utility analysis, transferring the result into a utility-net present value chart. In the case of the examined pilot landfill, assessing the landfill mining project produced a higher utility but a lower net present value than a landfill leaving-in for aftercare. Since no clearly preferable scenario could be identified this way, a cost-revenue analysis was carried out in addition that determined a dimensionless ratio: the 'utility - net present value quotient' of both scenarios. Comparing this quotient showed unmistakably that in the overall assessment, 'leaving the landfill in aftercare' was preferable to a 'landfill mining project' in that specific case. © The Author(s) 2016.

  1. "No queremos vender oxígeno" : the implementation of a REDD pilot project in the Bolivian Amazon

    OpenAIRE

    Bardalen, Ingunn

    2011-01-01

    Based on a six month fieldwork in an indigenous community in an indigenous territory, TCO, this thesis explore the initial stages of the implementation of a REDD pilot project in the northern Bolivian amazon. Since the establishment of the indigenous territory, there has been increasing pressure from logging companies and illegal logging, which has caused forest degradation in these areas. The REDD pilot project seek to reduce forest degradation in this area, and through monitoring this reduc...

  2. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  3. [Exercise-referral to a specialist in adapted physical activity (APA) : a pilot project].

    Science.gov (United States)

    Brugnerotto, Adeline; Cardinaux, Regula; Ueltschi, Yan; Bauwens, Marine; Nanchen, David; Cornuz, Jacques; Bize, Raphaël; Auer, Reto

    2016-11-02

    Family physicians have a key role in the promotion of physical activity, in particular in identifying and counseling persons who have a sedentary lifestyle. Some patients could benefit from intensive individual counseling. Physicians are often not aware of all physical activity promotion activities in the community that they could recommend their patients. In a pilot study, we have tested and adapted the referral of patients from family physicians to specialists in adapted physical activity (APAs). APAs are trained to assess and guide persons towards physical activities adapted to their needs and pathologies and thus towards an increase in physical activity. Pilot data suggest that, while few patients were oriented to the APAs in the pilot project, family physicians appreciate the possibility of collaborating with the APAs.

  4. The Recon Pilot Project: A Progress Report, October 1970-May 1971

    Directory of Open Access Journals (Sweden)

    Henriette D. Avram

    1971-09-01

    Full Text Available Synopsis of three progress reports on the RECON Pilot Project submitted by the Library of Congress to the Council on Library Resources covering the period October 1970-May 1971. Progress is reported in the following areas: RECON production, foreign language editing test, format recognition, microfilming, input devices, and tasks assigned to the RECON Working Task Force.

  5. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  6. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  7. The LEONARDO-DA-VINCI pilot project "e-learning-assistant" - Situation-based learning in nursing education.

    Science.gov (United States)

    Pfefferle, Petra Ina; Van den Stock, Etienne; Nauerth, Annette

    2010-07-01

    E-learning will play an important role in the training portfolio of students in higher and vocational education. Within the LEONARDO-DA-VINCI action programme transnational pilot projects were funded by the European Union, which aimed to improve the usage and quality of e-learning tools in education and professional training. The overall aim of the LEONARDO-DA-VINCI pilot project "e-learning-assistant" was to create new didactical and technical e-learning tools for Europe-wide use in nursing education. Based on a new situation-oriented learning approach, nursing teachers enrolled in the project were instructed to adapt, develop and implement e- and blended learning units. According to the training contents nursing modules were developed by teachers from partner institutions, implemented in the project centers and evaluated by students. The user-package "e-learning-assistant" as a product of the project includes two teacher training units, the authoring tool "synapse" to create situation-based e-learning units, a student's learning platform containing blended learning modules in nursing and an open sourced web-based communication centre. Copyright 2009 Elsevier Ltd. All rights reserved.

  8. National conversion pilot project: A creative approach to recyling

    International Nuclear Information System (INIS)

    Gandee, K.R.; Taylor, R.A.; Cornils, K.N.

    1995-01-01

    As a result of the Bush-Yeltsin summit in 1991, the U.S. Department of Energy (DOE) has undergone a significant downsizing of its defense mission. In July 1992, the Rocky Flats site in Colorado was the first DOE site to be closed. Its mission was changed from defense to environmental cleanup and economic development. Recognizing the need to assist displaced workers and affected communities and to conduct cost-effective cleanup of DOE sites, Congress initiated two legislative provisions in the 1994 National Defense Authorization Act that required DOE to (a) provide local impact assistance to communities that are affected by the defense downsizing and (b) conduct at least One waste recycling project within the 1994 fiscal year. At the Rocky Flats site, the National Conversion Pilot Project represents an innovative approach in which both Congressional requirements are achieved simultaneously, and the strategy for meeting these requirements was developed through the active participation of all stakeholders of the project

  9. Pilot Test of the Online Public Access Catalog Project's User and Nonuser Questionnaires. Final Report.

    Science.gov (United States)

    Markey, Karen

    This report describes the pilot data collections and post-questionnaire interview activities of the Council on Library Resources (CLR)/Online Computer Library Center (OCLC) Online Public Access Project. The background of the project is briefly described, the purpose and adminstration of the post-questionnaire interviews are outlined, and pilot…

  10. Maintenance planning for transmission routes with medium voltage overlines - experience within the framework of two pilot projects; Trassenpflegeplanung fuer Mittel- und Hochspannungsfreileitungen - Erfahrungen von zwei Pilotprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Geiges, H. [Ingenieurbuero Geiges, Freiraum- und Landschaftsplanung, Laumersheim (Germany)

    1997-11-03

    On the basis of the `VDEW Orientation Aid for Maintenance Measures in Transmission Routes` two pilot projects were selected in a 110 kV and a 20 kV overhead transmission route. (orig.) [Deutsch] Auf der Grundlage der `VDEW-Orientierungshilfe zu Pflegemassnahmen in Leitungstrassen` wurden Pilotprojekte in einer 110-kV- und in einer 20-kV-Freileitungstrasse im suedlichen Pfaelzerwald ausgewaehlt. (orig.)

  11. The Fermilab ISDN Pilot Project: Experiences and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  12. The Fermilab ISDN Pilot Project: Experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking

  13. The Fermilab ISDN pilot project: experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1996-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. each home was equipped with a basic rate ISDN (BRI) Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking. (author)

  14. Statistics on Science and Technology in Latin America, Experience with UNESCO Pilot Projects, 1972-1974.

    Science.gov (United States)

    Thebaud, Schiller

    This report examines four UNESCO pilot projects undertaken in 1972 in Brazil, Colombia, Peru, and Uruguay to study the methods used for national statistical surveys of science and technology. The projects specifically addressed the problems of comparing statistics gathered by different methods in different countries. Surveys carried out in Latin…

  15. Overview of NASA's Carbon Monitoring System Flux-Pilot Project

    Science.gov (United States)

    Pawson, Steven; Gunson, Michael R.; Jucks, Kenneth

    2011-01-01

    NASA's space-based observations of physical, chemical and biological parameters in the Earth System along with state-of-the-art modeling capabilities provide unique capabilities for analyses of the carbon cycle. The Carbon Monitoring System is developing an exploratory framework for detecting carbon in the environment and its changes, with a view towards contributing to national and international monitoring activities. The Flux-Pilot Project aims to provide a unified view of land-atmosphere and ocean-atmosphere carbon exchange, using observation-constrained models. Central to the project is the application of NASA's satellite observations (especially MODIS), the ACOS retrievals of the JAXA-GOSAT observations, and the "MERRA" meteorological reanalysis produced with GEOS-S. With a primary objective of estimating uncertainty in computed fluxes, two land- and two ocean-systems are run for 2009-2010 and compared with existing flux estimates. An transport model is used to evaluate simulated CO2 concentrations with in-situ and space-based observations, in order to assess the realism of the fluxes and how uncertainties in fluxes propagate into atmospheric concentrations that can be more readily evaluated. Finally, the atmospheric partial CO2 columns observed from space are inverted to give new estimates of surface fluxes, which are evaluated using the bottom-up estimates and independent datasets. The focus of this presentation will be on the science goals and current achievements of the pilot project, with emphasis on how policy-relevant questions help focus the scientific direction. Examples include the issue of what spatio-temporal resolution of fluxes can be detected from polar-orbiting satellites and whether it is possible to use space-based observations to separate contributions to atmospheric concentrations of (say) fossil-fuel and biological activity

  16. Insights from stakeholders of five residential smart grid pilot projects in the Netherlands

    NARCIS (Netherlands)

    Obinna, U.; Joore, P.; Wauben, L.; Reinders, Angelina H.M.E.

    2016-01-01

    This paper presents insights and perceptions of stakeholders involved in the development and implementation of residential smart grid pilot projects in the Netherlands, adding to the limited information that is currently available in this area, while expectations about the potential benefits of

  17. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  18. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  19. Pilot research projects for underground disposal of radioactive wastes in the United States of America

    International Nuclear Information System (INIS)

    Stein, R.; Collyer, P.L.

    1984-01-01

    Disposal of commercial radioactive waste in the United States of America in a deep underground formation will ensure permanent isolation from the biosphere with minimal post-closure surveillance and maintenance. The siting, design and development, performance assessment, operation, licensing, certification and decommissioning of an underground repository have stimulated the development of several pilot research projects throughout the country. These pilot tests and projects, along with their resulting data base, are viewed as important steps in the overall location and construction of a repository. Beginning in the 1960s, research at pilot facilities has progressed from underground spent fuel tests in an abandoned salt mine to the production of vitrified nuclear waste in complex borosilicate glass logs. Simulated underground repository experiments have been performed in the dense basalts of Washington State, the volcanic tuffaceous rock of Nevada and both domal and bedded salts of Louisiana and Kansas. In addition to underground pilot in situ tests, other facilities have been constructed or modified to monitor the performance of spent fuel in dry storage wells and self-shielded concrete casks. As the National Waste Terminal Storage (NWTS) programme advances to the next stage of underground site characterization for each of three different geological sites, additional pilot facilities are under consideration. These include a Test and Evaluation Facility (TEF) for site verification and equipment performance and testing, as well as a salt testing facility for verification of in situ simulation equipment. Although not associated with the NWTS programme, the construction of the Waste Isolation Pilot Plant (WIPP) in the bedded salts of New Mexico is well under way for deep testing and experimentation with the defence programme's transuranic nuclear waste. (author)

  20. Early screening for dyslexia--a collaborative pilot project.

    Science.gov (United States)

    Ball, S; Becker, T; Boys, M; Davies, S; Noton, H

    2001-01-01

    An ongoing collaborative project, currently being piloted in 12 Wiltshire primary schools, is described. The aim is to provide a means of identifying potentially dyslexic children by the end of Key Stage 1 (Year 2) with a view to early intervention. The causal links identified by research between phonological skills and literacy development are taken as the theoretical basis of an initial screening procedure, and an intervention package is implemented for identified children. Those demonstrating persistent difficulties one year later are further assessed over a school term using an assessment package designed to identify those children showing a dyslexic profile. Further intervention is then planned and implemented.

  1. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  2. Streaking into middle school science: The Dell Streak pilot project

    Science.gov (United States)

    Austin, Susan Eudy

    A case study is conducted implementing the Dell Streak seven-inch android device into eighth grade science classes of one teacher in a rural middle school in the Piedmont region of North Carolina. The purpose of the study is to determine if the use of the Dell Streaks would increase student achievement on standardized subject testing, if the Streak could be used as an effective instructional tool, and if it could be considered an effective instructional resource for reviewing and preparing for the science assessments. A mixed method research design was used for the study to analyze both quantitative and qualitative results to determine if the Dell Streaks' utilization could achieve the following: 1. instructional strategies would change, 2. it would be an effective instructional tool, and 3. a comparison of the students' test scores and benchmark assessments' scores would provide statistically significant difference. Through the use of an ANOVA it was determined a statistically significant difference had occurred. A Post Hoc analysis was conducted to identify where the difference occurred. Finally a T-test determined was there was no statistically significance difference between the mean End-of-Grade tests and four quarterly benchmark scores of the control and the experimental groups. Qualitative research methods were used to gather results to determine if the Streaks were an effective instructional tool. Classroom observations identified that the teacher's teaching styles and new instructional strategies were implemented throughout the pilot project. Students had an opportunity to complete a questionnaire three times during the pilot project. Results revealed what the students liked about using the devices and the challenges they were facing. The teacher completed a reflective questionnaire throughout the pilot project and offered valuable reflections about the use of the devices in an educational setting. The reflection data supporting the case study was drawn

  3. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  4. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  5. PROPOSAL FOR A STEP OF SELECTION SUPPORT OF BEST PRACTICES FOR THE PILOTING OF THE EMARKETING PROJECTS

    Directory of Open Access Journals (Sweden)

    Sébastien BRUYÈRE

    2011-01-01

    Full Text Available With 1.8 billion investments on the web in the first semester of 2008, being14.7% of publicity investmentsi, E-marketing is a discipline which is in themiddle of media strategies. However, the evolutions of internet and of emarketingtools have developed a discipline becoming increasingly complexto understand.Although there are still many different methods of piloting,essentially based on the measure via the discipline of the Web Analytics, it’sdifficult today to predict e-marketing actions to set up to make fluctuate keyperformance indicators of web site and active e-marketing lever statisticauditing solution. However it is starting from these indicators that success ismeasured and that the profits of the online activities are maximized. Thus wepropose through this article, a method of qualification of the Best Practices inorder to assist the online marketers in the choice and the selection of thoseto improve the performance of a site and associated actions E-Marketing.

  6. The Biomarker Knowledge System Informatics Pilot Project Supplement To The Biomarker Development Laboratory at Moffitt (Bedlam) — EDRN Public Portal

    Science.gov (United States)

    The Biomarker Knowledge System Informatics Pilot Project goal will develop network interfaces among databases that contain information about existing clinical populations and biospecimens and data relating to those specimens that are important in biomarker assay validation. This protocol comprises one of two that will comprise the Moffitt participation in the Biomarker Knowledge System Informatics Pilot Project. THIS PROTOCOL (58) is the Sput-Epi Database.

  7. Kinship--king's social harmonisation project. Pilot phase of a social network for use in higher education (HE).

    Science.gov (United States)

    John, B A

    2013-05-08

    Students entering Higher Education are increasingly information and communications technology literate. Many students (graduates and undergraduates) arrive as "digital residents", who are adept with social media and technologically fluent. The informal use of social media for learning is becoming increasingly evident, along with the potentially detrimental effects of a poor digital profile on employment prospects. This paper describes the creation of Kinship (King's Social Harmonisation Project), a university hosted, members only social network, which is currently being piloted in the Medical School at King's College London. Along with a number of other teaching and learning resources, it is intended to use Kinship to establish an informal code of conduct by modelling and moderating appropriate professional online behaviour. Kinship was developed using an open source Elgg platform, thanks to funding of £20,000 from the College Teaching Fund under the mentorship of Brighton University (1). This educational research project, led by Medicine, was proposed to select, customise and evaluate a social networking platform in order to provide functionality that would enhance new and existing e-learning resources, support group interaction, participation and sharing and meet the diverse needs of three academic schools: Medicine, the Dental Institute and two separate Departments, the Modern Languages Centre and the Department of English from Arts & Humanities, as a pilot for wider College deployment. Student involvement is central to the project, from conducting the evaluation to moulding and customising the functionality and look of Kinship, in order to ensure that the site is authentic and evolves in response to their wishes and requirements. Formal evaluation of Kinship commences summer 2012.

  8. Location Independent Professional Project: A Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  9. The National Map - Missouri Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  10. The National Map - Delaware Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  11. The National Map - Pennsylvania Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  12. The National Map - Texas Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  13. The National Map - Florida Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  14. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  15. DSM energy saving pilot project report. Furniture Plant Teika, Riga, Latvia

    International Nuclear Information System (INIS)

    Ananevski, V.; Kalejs, M.; Hercogs, J.; Blumbergs, U.

    1995-07-01

    The purpose of this pilot project was to carry out energy audit into the furniture plant TEIKA and energy saving measures. Another aim was to transfer the Danish know how and experience obtained through the Danish effort in Latvian industries consumers. Therefore great attention is paid to energy mapping in order to show possibilities of the Danish methodisms. This report is a part of the Joint Latvian - Danish Project Demand Side Management and Energy Saving. It is a results of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and on the other hand a Danish team, which was represented by the Danish Power Consult company NESA. (EG)

  16. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  17. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  18. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  19. The NYC native air sampling pilot project: using HVAC filter data for urban biological incident characterization.

    Science.gov (United States)

    Ackelsberg, Joel; Leykam, Frederic M; Hazi, Yair; Madsen, Larry C; West, Todd H; Faltesek, Anthony; Henderson, Gavin D; Henderson, Christopher L; Leighton, Terrance

    2011-09-01

    Native air sampling (NAS) is distinguished from dedicated air sampling (DAS) devices (eg, BioWatch) that are deployed to detect aerosol disseminations of biological threat agents. NAS uses filter samples from heating, ventilation, and air conditioning (HVAC) systems in commercial properties for environmental sampling after DAS detection of biological threat agent incidents. It represents an untapped, scientifically sound, efficient, widely distributed, and comparably inexpensive resource for postevent environmental sampling. Calculations predict that postevent NAS would be more efficient than environmental surface sampling by orders of magnitude. HVAC filter samples could be collected from pre-identified surrounding NAS facilities to corroborate the DAS alarm and delineate the path taken by the bioaerosol plume. The New York City (NYC) Native Air Sampling Pilot Project explored whether native air sampling would be acceptable to private sector stakeholders and could be implemented successfully in NYC. Building trade associations facilitated outreach to and discussions with property owners and managers, who expedited contact with building managers of candidate NAS properties that they managed or owned. Nominal NAS building requirements were determined; procedures to identify and evaluate candidate NAS facilities were developed; data collection tools and other resources were designed and used to expedite candidate NAS building selection and evaluation in Manhattan; and exemplar environmental sampling playbooks for emergency responders were completed. In this sample, modern buildings with single or few corporate tenants were the best NAS candidate facilities. The Pilot Project successfully demonstrated that in one urban setting a native air sampling strategy could be implemented with effective public-private collaboration.

  20. Handheld computers in nursing education: PDA pilot project.

    Science.gov (United States)

    Koeniger-Donohue, Rebecca

    2008-02-01

    Interest in the use and application of handheld technology at undergraduate and graduate nursing programs across the country is growing rapidly. Personal digital assistants (PDAs) are often referred to as a "peripheral brain" because they can save time, decrease errors, and simplify information retrieval at the point of care. In addition, research results support the notion that PDAs enhance nursing clinical education and are an effective student learning resource. However, most nursing programs lack the full range of technological resources to implement and provide ongoing support for handheld technology use by faculty and students. This article describes a 9-month pilot project for the initial use of PDAs by novice faculty and students at Simmons College.

  1. The photovoltaic pilot projects of the European Community

    Science.gov (United States)

    Schnell, W.

    The Commission of the European Communities has started in 1980 a programme for the design and construction of a series of photovoltaic pilot projects in the range of 30-300 kWp. Virtually all important industries and other development organisations in Europe working on photovoltaic cells and systems are involved in this programme. The different technologies which are being developed concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of an island, villages, recreation centres, water desalination and disinfection, powering of radio transmitters, emergency power plants, dairy farm, training school, cooling, water pumping, powering of a solar heated swimming pool and last but not least, hydrogen production.

  2. The Palouse Basin Participatory Model Pilot Project: A Participatory Approach to Bi-state Groundwater Management

    Science.gov (United States)

    Beall, A.; Fiedler, F.; Boll, J.; Cosens, B.; Harris, C.

    2008-12-01

    In March 2008, The University of Idaho Waters of the West, the Palouse Basin Aquifer Committee and its Citizen Advisory Group undertook a pilot project to explore the use of participatory modeling to assist with water resource management decisions. The Palouse basin supplies Moscow, Idaho, Pullman, Washington, and surrounding communities with high quality groundwater. However, water levels in the major aquifer systems have been declining since records have been kept. Solutions are complicated by jurisdictional considerations and limited alternatives for supply. We hope that by using a participatory approach major conflicts will be avoided. Group system dynamics modeling has been used for various environmental concerns such as air quality, biological management, water quality and quantity. These models create a nexus of science, policy, and economic and social concerns, which enhances discussion of issues surrounding the use of natural resources. Models may be developed into educational and or decision support tools which can be used to assist with planning processes. The long-term goal of the Palouse basin project is to develop such a model. The pilot project participants include hydrologists, facility operators, policy makers and local citizens. The model they have developed integrates issues such as scientific uncertainty, groundwater volumes, and potential conservation measures and costs. Preliminary results indicate that participants are satisfied with the approach and are looking to use the model for education and to help direct potential research. We will present the results of the pilot project, including the developed model and insights from the process.

  3. Thermal sludge treatment. Pilot project on the possibilities and marginal conditions; Thermische slibontsluiting. Pilot-onderzoek naar de mogelijkheden en randvoorwaarden

    Energy Technology Data Exchange (ETDEWEB)

    Berkhof, D.; Koornneef, E.; Janus, H. [Royal Haskoning DHV, Amersfoort (Netherlands)

    2012-09-15

    As part of the agreements within the framework of the Dutch Green Deal between Water Boards and the Ministry of Economic Affairs, Agriculture and Innovation (ELI) a research program has been set up which addresses the implementation of new developments that can improve energy efficiency in the treatment of waste water. Attention is paid to supercritical gasification, supercritical oxidation and conventional gasification. The study on conventional gasification is split into two phases: research into the economic feasibility in combination with TDH (thermal pressure hydrolysis) and drying, and next to that a pilot plant. This report concerns phase 2: pilot projects on thermal sewage treatment [Dutch] Als onderdeel van de afspraken in het kader van de Green Deal tussen Waterschappen en het ministerie van ELI is een onderzoeksprogramma opgesteld gericht op het implementeren van nieuwe ontwikkelingen die de energie efficientie bij de verwerking van afvalwater kunnen verbeteren. Daarbij wordt gekeken naar superkritische vergassing en oxidatie en naar conventionele vergassing. De studie naar conventionele vergassing is gesplitst in 2 fasen: onderzoek naar de economische haalbaarheid in combinatie met TDH (thermische druk hydrolyse), en drogen en daarnaast een onderzoek op pilot plant/praktijkschaal. In de onderhavige rapportage wordt fase 2, het onderzoek op pilot plant/praktijkschaal naar thermische slibontsluiting (TSO) beschreven.

  4. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  5. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  6. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  7. Experimental Design of a Polymeric Solution to Improve the Mobility Ratio in a Reservoir previous implementation of a pilot project of EOR

    Directory of Open Access Journals (Sweden)

    Vanessa Cuenca

    2016-12-01

    Full Text Available This paper describes experimental formulations of polymeric solutions through lab evaluations with the objective of finding optimum solution concentration to fluid mobility in reservoirs as previous step before implementing a pilot project of enhanced oil recovery. The polymers, firstly, were selected based on the properties from fluids from reservoir. Two types of polymers were used TCC-330 and EOR909 and the experimental tests were: thermal stability, compatibility, adsorption, salinity, and displacement. The design with the best results was with polymer TCC-330 at 1,500 ppm concentration.

  8. Evaluation of bridge decks using non-destructive evaluation (NDE) at near highway speeds for effective asset management - pilot project.

    Science.gov (United States)

    2016-09-29

    This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...

  9. The Teen Photovoice Project: A Pilot Study to Promote Health Through Advocacy

    Science.gov (United States)

    Necheles, Jonathan W.; Chung, Emily Q.; Hawes-Dawson, Jennifer; Ryan, Gery W.; Williams, La’Shield B.; Holmes, Heidi N.; Wells, Kenneth B.; Vaiana, Mary E.; Schuster, Mark A.

    2009-01-01

    Background Clinicians, public health practitioners, and policymakers would like to understand how youth perceive health issues and how they can become advocates for health promotion in their communities. 1,2 Traditional research methods can be used to capture these perceptions, but are limited in their ability to activate (excite and engage) youth to participate in health promotion activities. Objectives To pilot the use of an adapted version of photovoice as a starting point to engage youth in identifying influences on their health behaviors in a process that encourages the development of health advocacy projects. Methods Application of qualitative and quantitative methods to a participatory research project that teaches youth the photovoice method to identify and address health promotion issues relevant to their lives. Participants included 13 students serving on a Youth Advisory Board (YAB) of the UCLA/RAND Center for Adolescent Health Promotion working in four small groups of two to five participants. Students were from the Los Angeles, California, metropolitan area. Results Results were derived from photograph sorting activities, analysis of photograph narratives, and development of advocacy projects. Youth frequently discussed a variety of topics reflected in their pictures that included unhealthy food choices, inducers of stress, friends, emotions, environment, health, and positive aspects of family. The advocacy projects used social marketing strategies, focusing on unhealthy dietary practices and inducers of stress. The youths’ focus on obesity-related issues have contributed to the center’s success in partnering with the Los Angeles Unified School District on a new community-based participatory research (CBPR) project. Conclusion Youth can engage in a process of identifying community-level health influences, leading to health promotion through advocacy. Participants focused their advocacy work on selected issues addressing the types of unhealthy food

  10. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  11. Grid workflow job execution service 'Pilot'

    Science.gov (United States)

    Shamardin, Lev; Kryukov, Alexander; Demichev, Andrey; Ilyin, Vyacheslav

    2011-12-01

    'Pilot' is a grid job execution service for workflow jobs. The main goal for the service is to automate computations with multiple stages since they can be expressed as simple workflows. Each job is a directed acyclic graph of tasks and each task is an execution of something on a grid resource (or 'computing element'). Tasks may be submitted to any WS-GRAM (Globus Toolkit 4) service. The target resources for the tasks execution are selected by the Pilot service from the set of available resources which match the specific requirements from the task and/or job definition. Some simple conditional execution logic is also provided. The 'Pilot' service is built on the REST concepts and provides a simple API through authenticated HTTPS. This service is deployed and used in production in a Russian national grid project GridNNN.

  12. Grid workflow job execution service 'Pilot'

    International Nuclear Information System (INIS)

    Shamardin, Lev; Kryukov, Alexander; Demichev, Andrey; Ilyin, Vyacheslav

    2011-01-01

    'Pilot' is a grid job execution service for workflow jobs. The main goal for the service is to automate computations with multiple stages since they can be expressed as simple workflows. Each job is a directed acyclic graph of tasks and each task is an execution of something on a grid resource (or 'computing element'). Tasks may be submitted to any WS-GRAM (Globus Toolkit 4) service. The target resources for the tasks execution are selected by the Pilot service from the set of available resources which match the specific requirements from the task and/or job definition. Some simple conditional execution logic is also provided. The 'Pilot' service is built on the REST concepts and provides a simple API through authenticated HTTPS. This service is deployed and used in production in a Russian national grid project GridNNN.

  13. Russian energy efficiency projects: lessons learnt from Activities Implemented Jointly pilot phase

    International Nuclear Information System (INIS)

    Korppoo, Anna

    2005-01-01

    Russia needs to improve the efficiency of energy. Failure to do so will retard the economic recovery of the country, but the energy sector is lacking both domestic and foreign investments. JI projects could provide the underfinanced Russian energy sector with additional investments. AIJ pilot project experiences provide an overview of the potential difficulties for future JI projects. Institutional problems were the most important category. Most of these problems remain, and the lack of ratification of the Kyoto Protocol by Russia has formed a new very significant barrier. Implementation level problems caused some problems to AIJ projects, but they are likely to have less impact on the better prepared JI projects. The character of funding-related problems has changed: for AIJ projects the main problem was that emission reductions could not be credited, whereas future JI projects will experience more competition in the Kyoto market where the overall investment climate and the availability of local cofunding are more relevant. Therefore, the unfinished economic and energy sector reforms currently discourage JI investments. The project experiences so far have been dismal, and if Russian policy-makers cannot improve this performance, only few JI projects can be expected in the future

  14. An analysis of the impact of the thermonuclear pilot project ITER on industry and research in Austria

    International Nuclear Information System (INIS)

    Hangel, G.

    2007-03-01

    An analysis of the influence of the thermonuclear pilot project ITER on Austrian research and industrial activities is presented in terms of the following subjects: fusion research history, ITER technique, security, nuclear fusion, ITER (reactor, project specifications for quotations), possibilities for Austrian companies and fusion research in Austria. (nevyjel)

  15. Life-Long Cyberlearning System: A Pilot Project for the "Learning Society" in the ROC.

    Science.gov (United States)

    Han, Huei-Wen; Wang, Yen-Chao

    1999-01-01

    Provides an overview of the implementation of lifelong learning in Taiwan, Republic of China (ROC) as part of its educational reform policy and describes a pilot project, the Lifelong Cyberlearning System. Highlights include planning architecture, Web-based learning technology, professional education, industrial and corporate assistance, and…

  16. Communication training as a part of medical education: a pilot project

    Directory of Open Access Journals (Sweden)

    Petersen, Corinna

    2005-01-01

    Full Text Available Within the last years, the importance of communication skills regarding the doctor-patient-relationship received more attention. Medical school curricula for future physicians must include teaching of communication skills as well. A pilot project for training communicative basic skills at the University Hospital Hamburg-Eppendorf will be presented. The content of teaching was generated by employees of the Institute and Policlinics of Medical Psychology. Contents of the course will be described and experiences discussed.

  17. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  18. Comparison of midwifery care to medical care in hospitals in the Quebec pilot projects study: clinical indicators. L'Equipe dEvaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Fraser, W; Hatem-Asmar, M; Krauss, I; Maillard, F; Bréart, G; Blais, R

    2000-01-01

    The purpose of this study was to compare indicators of process and outcome of midwifery services provided in the Quebec pilot projects to those associated with standard hospital-based medical services. Women receiving each type of care (961 per group) were matched on the basis of socio-demographic characteristics and level of obstetrical risk. We found midwifery care to be associated with less obstetrical intervention and a reduction in selected indicators of maternal morbidity (caesarean section and severe perineal injury). For neonatal outcome indicators, midwifery care was associated with a mixture of benefits and risks: fewer babies with preterm birth and low birthweight, but a trend toward a higher stillbirth ratio and more frequent requirement for neonatal resuscitation. The study design does not permit to conclude that the associations were causal in nature. However, the high stillbirth rate observed in the group of women who were selected for midwife care raises concerns both regarding the appropriateness of the screening procedures for admission to such care and regarding the quality of care itself.

  19. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  20. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  1. Pilot projects and their diffusion: a case study of integrated coastal management in South Africa

    CSIR Research Space (South Africa)

    Vreugdenhil, H

    2012-01-01

    Full Text Available contribution to the diffusion of the innovation and so to a policy transition in South African coastal zone management. Finally, we identify types of pilot project and the accompanying design choices that are most suitable for transition management....

  2. Personnel Selection Influences on Remotely Piloted Aircraft Human-System Integration.

    Science.gov (United States)

    Carretta, Thomas R; King, Raymond E

    2015-08-01

    Human-system integration (HSI) is a complex process used to design and develop systems that integrate human capabilities and limitations in an effective and affordable manner. Effective HSI incorporates several domains, including manpower, personnel and training, human factors, environment, safety, occupational health, habitability, survivability, logistics, intelligence, mobility, and command and control. To achieve effective HSI, the relationships among these domains must be considered. Although this integrated approach is well documented, there are many instances where it is not followed. Human factors engineers typically focus on system design with little attention to the skills, abilities, and other characteristics needed by human operators. When problems with fielded systems occur, additional training of personnel is developed and conducted. Personnel selection is seldom considered during the HSI process. Complex systems such as aviation require careful selection of the individuals who will interact with the system. Personnel selection is a two-stage process involving select-in and select-out procedures. Select-in procedures determine which candidates have the aptitude to profit from training and represent the best investment. Select-out procedures focus on medical qualification and determine who should not enter training for medical reasons. The current paper discusses the role of personnel selection in the HSI process in the context of remotely piloted aircraft systems.

  3. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  4. Using an Optionally Piloted Aircraft for Airborne Gravity Observations with the NOAA GRAV-D Project

    Science.gov (United States)

    Youngman, M.; Johnson, J. A.; van Westrum, D.; Damiani, T.

    2017-12-01

    The U.S. National Geodetic Survey's (NGS) Gravity for the Redefintion of the American Vertical Datum (GRAV-D) project is collecting airborne gravity data to support a 1 cm geoid. Started in 2008, this project will collect airborne gravity data over the entire U.S. and territories by 2022. As of June 30, 2017, the project was almost 62% complete. With recent technological developments, NGS has been exploring using unmanned aircraft for airborne gravity measurements. This presentation will focus on results from two surveys over the U.S. Appalachian and Rocky Mountains using the Aurora Centaur Optionally Piloted Aircraft and the Micro-g Lacoste Turnkey Airborne Gravimeter System 7 (TAGS7). Collecting high quality data as well as dealing with remote locations has been a challenge for the GRAV-D project and the field of airborne gravity in general. Unmanned aircraft could potentially improve data quality, handle hard to reach locations, and reduce pilot fatigue. The optionally piloted Centaur aircraft is an attractive option because it is not restricted in U.S. airspace and delivers high quality gravity data. Specifically, the Centaur meets U.S. Federal Aviation Administration regulations for Unmanned Aircraft Systems (UAS) by using a safety pilot on board to maintain line of sight and the ability to take control in the event of an emergency. Even though this is a sizeable UAS, most traditional gravimeters are too large and heavy for the platform. With a smaller and lighter design, the TAGS7 was used for its ability to conform to the aircraft's size restrictions, with the added benefit of upgraded performance capabilities. Two surveys were performed with this aircraft and gravimeter, one in April and one in August to September of 2017. Initial results indicate that the high-gain, fast response of the Centaur autopilot (optimized for flights without passengers), coupled with the full-force feedback sensor of the TAGS7, provides superior performance in all conditions, and

  5. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  6. Global Climate Change Pilot Course Project

    Science.gov (United States)

    Schuenemann, K. C.; Wagner, R.

    2011-12-01

    In fall 2011 a pilot course on "Global Climate Change" is being offered, which has been proposed to educate urban, diverse, undergraduate students about climate change at the introductory level. The course has been approved to fulfill two general college requirements, a natural sciences requirement that focuses on the scientific method, as well as a global diversity requirement. This course presents the science behind global climate change from an Earth systems and atmospheric science perspective. These concepts then provide the basis to explore the effect of global warming on regions throughout the world. Climate change has been taught as a sub-topic in other courses in the past solely using scientific concepts, with little success in altering the climate change misconceptions of the students. This pilot course will see if new, innovative projects described below can make more of an impact on the students' views of climate change. Results of the successes or failures of these projects will be reported, as well as results of a pre- and post-course questionnaire on climate change given to students taking the course. Students in the class will pair off and choose a global region or country that they will research, write papers on, and then represent in four class discussions spaced throughout the semester. The first report will include details on the current climate of their region and how the climate shapes that region's society and culture. The second report will discuss how that region is contributing to climate change and/or sequestering greenhouse gases. Thirdly, students will discuss observed and predicted changes in that region's climate and what impact it has had, and could have, on their society. Lastly, students will report on what role their region has played in mitigating climate change, any policies their region may have implemented, and how their region can or cannot adapt to future climate changes. They will also try to get a feel for the region

  7. 78 FR 71645 - Pilot Project for Tribal Jurisdiction over Crimes of Domestic Violence

    Science.gov (United States)

    2013-11-29

    ...This final notice establishes procedures for Indian tribes to request designation as participating tribes under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, under the voluntary pilot project described in the Violence Against Women Reauthorization Act; establishes procedures for the Attorney General to act on such requests; and solicits such requests from Indian tribes.

  8. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  9. A competency based selection procedure for Dutch postgraduate GP training: a pilot study on validity and reliability

    NARCIS (Netherlands)

    Vermeulen, M.I.; Tromp, F.; Zuithoff, N.P.; Pieters, R.H.; Damoiseaux, R.A.; Kuyvenhoven, M.M.

    2014-01-01

    Abstract Background: Historically, semi-structured interviews (SSI) have been the core of the Dutch selection for postgraduate general practice (GP) training. This paper describes a pilot study on a newly designed competency-based selection procedure that assesses whether candidates have the

  10. A methodology for assessment of road structures for the PBS pilot project in South Africa

    CSIR Research Space (South Africa)

    Nordengen, Paul A

    2016-11-01

    Full Text Available This paper describes the methodology that is being used for the performance assessment of PBS vehicles in terms of road structures as part of the PBS pilot project in South Africa. The assessment approach has evolved from the standard “bridge...

  11. Optimization of the cumulative risk assessment of pesticides and biocides using computational techniques: Pilot project

    DEFF Research Database (Denmark)

    Jonsdottir, Svava Osk; Reffstrup, Trine Klein; Petersen, Annette

    This pilot project is intended as the first step in developing a computational strategy to assist in refining methods for higher tier cumulative and aggregate risk assessment of exposure to mixture of pesticides and biocides. For this purpose, physiologically based toxicokinetic (PBTK) models were...

  12. The Citizenship Safety Project: a pilot study.

    Science.gov (United States)

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  13. Pilot project wind power - Large scale wind power in northern Sweden; Pilotprojekt vindkraft - Storskalig vindkraft i norra Sverige

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Swedish Energy Agency granted 2009-04-20 Svevind AB financial aid to implement {sup P}ilot project wind power- Large scale wind power in northern Sweden{sup .} The purpose of the aid is to implement pilot sub-projects in wind power, to to increase knowledge for the larger establishments. The Energy Agency said in its decision that the projects Dragaliden and Gabriel Mountain is of 'great importance for future large-scale development of wind power in Sweden'. The special conditions prevailing in the project, forest environment and cold climate, gives the possibility of studies of wind turbines on birds, reindeer herding and hunting and the more technical aspects, such as de-icing and obstacle lighting. The objectives of the project, in addition to the construction and operation of 32 wind turbines, has been to include evaluating the permit process, studying the social effects around the wind power, to study the impact on small game hunting, perform tests of the de-icing system, investigate impacts on reindeer herding and explain the outcome of the project-generated rural funds. Some of the above sub-projects have been completed, which are reported in this report. For the sub-projects still in progress, the report presents the results to date, until the completion.

  14. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  15. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  16. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  17. Monitoring pilot projects on bored tunnelling : The Second Heinenoord Tunnel and the Botlek Rail Tunnel

    NARCIS (Netherlands)

    Bakker, K.J.; De Boer, F.; Admiraal, J.B.M.; Van Jaarsveld, E.P.

    1999-01-01

    Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be

  18. Pilot project for implantation of the National Commission on Radiation Protection and Dosimetry of CONTER, Brazil

    International Nuclear Information System (INIS)

    Padilha Filho, L.G.; Santos, J.R.A.; Dmitruk, P.P.; Souza, J.H.C.; Hamann, J.H.; Soboll, D.S.

    2017-01-01

    This work presents the pilot project of the National Council of Technicians and Technologists in Radiology (CONTER), which created the National Commission on Radioprotection and Dosimetry (CNRD), in order to develop a radioprotection culture for professionals in radiographic techniques

  19. Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Demuth, Scott Francis [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sprinkle, James K. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-26

    As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout of Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.

  20. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  1. An Audit Learning Experience: A Pilot Project through Cooperation with a Third Sector Organization

    Science.gov (United States)

    Tonge, Richard; Willett, Caroline

    2012-01-01

    This paper is a critical evaluation of a pilot cooperative education project conducted with a charitable organization in the UK. An action research approach was adopted. Final level students who are studying auditing have had the opportunity to apply the knowledge and skills they are developing through their studies to a real-life situation in the…

  2. Waste handling and storage in the decontamination pilot projects of JAEA for environments of Fukushima

    Energy Technology Data Exchange (ETDEWEB)

    Nakayama, S.; Kawase, K.; Iijima, K.; Kato, M. [Fukushima Environmental Safety Center, Headquarters of Fukushima Partnership Operations, Japan Atomic Energy Agency, Fukushima (Japan)

    2013-07-01

    After the Fukushima Daiichi nuclear accident, Japan Atomic Energy Agency (JAEA) was chosen by the national government to conduct decontamination pilot projects at selected sites in Fukushima prefecture. Despite tight boundary conditions in terms of timescale and resources, the projects served their primary purpose to develop a knowledge base to support more effective planning and implementation of stepwise regional remediation of the evacuated zone. A range of established, modified and newly developed techniques were tested under realistic field conditions and their performance characteristics were determined. The results of the project can be summarized in terms of site characterization, cleanup and waste management. A range of options were investigated to reduce the volumes of waste produced and to ensure that decontamination water could be cleaned to the extent that it could be discharged to normal drainage. Resultant solid wastes were packaged in standard flexible containers, labelled and stored at the remediation site (temporary storage until central interim storage becomes available). The designs of such temporary storage facilities were tailored to available sites, but all designs included measures to ensure mechanical stability (e.g., filling void spaces between containers with sand, graded cover with soil) and prevent releases to groundwater (impermeable base and cap, gravity flow drainage including radiation monitors and catch tanks). Storage site monitoring was also needed to check that storage structures would not be perturbed by external events that could include typhoons, heavy snowfalls, freeze/thaw cycles and earthquakes. (authors)

  3. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  4. Projets Pilotes Quebecois Portant sur L'Integration Scolaire aux Niveaux Pre-Scolaire et Primaire (Quebec Pilot Projects on Mainstreaming of Preschool and Primary-Level Schoolchildren).

    Science.gov (United States)

    Saint-Laurent, Lise; And Others

    1992-01-01

    This article synthesizes 55 Quebec (Canada) pilot projects on mainstreaming of pupils with learning disabilities, behavior disorders, physical or sensorial handicaps, or mental handicaps, at preschool and elementary levels. It focuses on extent of integration, interventions, training and support for teachers, and evaluation methodology used.…

  5. [Evaluation of 12 pilot projects to improve outpatient palliative care].

    Science.gov (United States)

    Schmidt-Wolf, G; Elsner, F; Lindena, G; Hilgers, R-D; Heussen, N; Rolke, R; Ostgathe, C; Radbruch, L

    2013-12-01

    With a priority programme the German Cancer Aid supported the development of quality-assured outpatient palliative care to cover the whole country. The 12 regional pilot projects funded with the aim to improve outpatient palliative care in different models and different frameworks were concurrently monitored and evaluated. The supported projects, starting and ending individually, documented all patients who were cared for using HOPE (Hospice and palliative care evaluation) and MIDOS (Minimal documentation system for palliative patients). Total data were analyzed for 3239 patients decriptively. In addition to the quantitative data the experiences of the projects were recorded in a number of workshops (2008, 2009, 2010, and 2012). In particular, the experiences reported in the final meeting in July 2012 were considered for this article as well as the final reports for the German Cancer Aid. In the quantitative evaluation 85.6% of 3239 palliative care patients had a cancer diagnosis. In all model projects the goal of a network with close cooperation of primary providers, social support, and outpatient and inpatient specialist services has been achieved. For all projects, the initial financing of the German Cancer Aid was extremely important, because contracts with health insurance funds were negotiated slowly, and could then be built on the experiences with the projects. The participants of the project-completion meeting emphasized the need to carry out a market analysis before starting palliative care organizations considering the different regional structures and target groups of patients. Education, training and continuing education programs contribute significantly to the network. A reliably funded coordination center/case management across all institutions is extremely important. © Georg Thieme Verlag KG Stuttgart · New York.

  6. Measuring the quality of clinical audit projects.

    Science.gov (United States)

    Millard, A D

    2000-11-01

    The aim of the study was to develop and pilot a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments assessing the quality of clinical audit projects to form a Likert scale. Audit facilitators based in Scottish health boards and trusts piloted the scale. The participants were known to have over 2 years of experience of supporting clinical audit. The response at first test was 11 of 14 and at the second test 27 of 46. Audit facilitators tested the draft scale by expressing their strength of agreement or disagreement with each statement for three reports. Validity and reliability were assessed by test - re-test, item - total, and total - global indicator correlation. Of the 20 statements, 15 had satisfactory correlation with scale totals. Scale totals had good correlation with global indicators. Test re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  7. Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.

    Science.gov (United States)

    Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron

    2007-05-16

    To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.

  8. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  9. Transitioning the GED[R] Mathematics Test to Computer with and without Accommodations: A Pilot Project

    Science.gov (United States)

    Patterson, Margaret Becker; Higgins, Jennifer; Bozman, Martha; Katz, Michael

    2011-01-01

    We conducted a pilot study to see how the GED Mathematics Test could be administered on computer with embedded accessibility tools. We examined test scores and test-taker experience. Nineteen GED test centers across five states and 216 randomly assigned GED Tests candidates participated in the project. GED candidates completed two GED mathematics…

  10. A Pilot Project Demonstrating that Combat Medics Can Safely Administer Parenteral Medications in the Emergency Department.

    Science.gov (United States)

    Schauer, Steven G; Cunningham, Cord W; Fisher, Andrew D; DeLorenzo, Robert A

    2017-12-01

    Introduction Select units in the military have improved combat medic training by integrating their functions into routine clinical care activities with measurable improvements in battlefield care. This level of integration is currently limited to special operations units. It is unknown if regular Army units and combat medics can emulate these successes. The goal of this project was to determine whether US Army combat medics can be integrated into routine emergency department (ED) clinical care, specifically medication administration. Project Design This was a quality assurance project that monitored training of combat medics to administer parenteral medications and to ensure patient safety. Combat medics were provided training that included direct supervision during medication administration. Once proficiency was demonstrated, combat medics would prepare the medications under direct supervision, followed by indirect supervision during administration. As part of the quality assurance and safety processes, combat medics were required to document all medication administrations, supervising provider, and unexpected adverse events. Additional quality assurance follow-up occurred via complete chart review by the project lead. Data During the project period, the combat medics administered the following medications: ketamine (n=13), morphine (n=8), ketorolac (n=7), fentanyl (n=5), ondansetron (n=4), and other (n=6). No adverse events or patient safety events were reported by the combat medics or discovered during the quality assurance process. In this limited case series, combat medics safely administered parenteral medications under indirect provider supervision. Future research is needed to further develop this training model for both the military and civilian setting. Schauer SG , Cunningham C W, Fisher AD , DeLorenzo RA . A pilot project demonstrating that combat medics can safely administer parenteral medications in the emergency department. Prehosp Disaster Med. 2017;32(6):679-681.

  11. Introduction of a prehospital critical incident monitoring system--pilot project results.

    Science.gov (United States)

    Stella, Julian; Davis, Anna; Jennings, Paul; Bartley, Bruce

    2008-01-01

    Hospital medical incident monitoring improves preventable morbidity and mortality rates. Error management systems have been adopted widely in this setting. Data relating to incident monitoring in the prehospital setting is limited. Implementation of an incident monitoring process in a prehospital setting. This is a prospective, descriptive study of the pilot phase of the implementation of an incident monitoring process in a regional prehospital setting, with a focus on trauma care. Paramedics and emergency department staff submitted anonymous incident reports, and a chart review was performed on patients who met major trauma criteria. Selected trauma cases were analyzed by a structured interview/debriefing process to elucidate undocumented incidents. A project committee coded and logged all incidents and developed recommendations. Of 4,429 ambulance responses, 41 cases were analyzed. Twenty-four (58.5%; 95% CI = 49.7-67.4%) were reported anonymously, and the rest were major trauma patients. A total of 77 incidents were identified (mean per case = 1.8; CI = 1.03-2.57). Anonymous cases revealed 26 incidents (mean = 1.1; CI = 0.98-1.22); eight trauma debriefings revealed 38 incidents (mean = 4.8; CI = 0.91-8.69) and nine trauma chart reviews revealed 13 incidents (mean = 1.6; CI = 1.04-2.16). A total of 56 of 77 (72.7%; CI = 65.5-80.0%) incidents related to system inadequacies, and 15 (57.7%; CI = 46.7-68.6%) anonymously reported incidents related to resource problems. A total of 35 of 77 (45.5%; CI = 40.4-50.5%) incidents had minimal or no impact on the patients' outcomes. Thirty-four of 77 (44.2%; CI = 39.3-49.1%) incidents were considered mitigated by circumstance. Incident monitoring led to generalized feedback in most cases (65 of 77; 84.4%; CI = 77.6-91.3%); in three cases (3.9%; CI = 3.7-4.1%), specific education occurred; two cases were reported to an external body (2.6%; CI = 2.5-2.7%); three cases resulted in remedial action (3.9%; CI = 3.7-4.1%); four for

  12. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  13. Technology Cooperation Agreement Pilot Project: Development-Friendly Greenhouse Gas Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.

    1998-10-30

    This paper provides an overview of TCAPP, including the methodology, the results to date, and proposed future activities. It includes a detailed description of the technology cooperation frameworks completed by each country, the process that produced them and the plans for how TCAPP will help to implement the directions articulated by the country teams. The US Government initiated the Technology Cooperation Agreement Pilot Project (TCAPP) in August 1997 in recognition of the need to establish a mechanism for implementing Article 4.5 of the Framework Convention on Climate Change. ''The developed country partners shall take all practicable steps to promote, facilitate and finance, as appropriate, the transfer of, or access to, environmentally sound technologies and know-how to other Parties, particularly developing country Parties, to enable them to implement the provisions of the Convention.'' TCAPP builds support for implementing clean energy technologies by facilitating collaboration among the participating countries, the US and other OECD countries, international donors, and the private sector. The governments of Brazil, China, Kazakhstan, Mexico and the Philippines are currently participating and helping to shape this initiative. International donors and the private sector have also been actively engaged in the design and implementation of this pilot program.

  14. Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP). Supplementary task programme

    International Nuclear Information System (INIS)

    1992-06-01

    In the course of Phase II of the Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP), it was found that a number of topical aspects required more detail investigations, specific tests etc. than could be cared for within Phase II, under the constraint of available time and funds. Consequently, supplementary tasks have been defined and contracted. This report is the Final Report on the results achieved during the performance of these tasks. The tasks cover a wide field for example LH 2 Airbus studies some can be associated with more than one aspect. The table following hereunder may give an overview over the tasks covered. For all 23 papers a separate subject analysis has been carried out. (orig.)

  15. Integrating Informatics into the Undergraduate Curriculum: A Report on a Pilot Project.

    Science.gov (United States)

    Ingram, D; Murphy, J

    1996-01-01

    Previous case reports in this series on Education and Training have looked at specialist courses for postgraduate students seeking an in-depth knowledge of informatics and a career in the field. By contrast, this review describes a project designed to pilot a series of learning opportunities for undergraduate medical students. Although some UK medical colleges have opted to introduce informatics into the curriculum as a discipline in its own right, the Informatics Department at St Bartholomew's Hospital Medical College chose a different approach. When a new curriculum was introduced at St Bartholomew's and at The London Hospital Medical College, the Head of the Informatics Department saw this as an ideal opportunity to explore ways of integrating informatics into the curriculum. The initiatives described in this paper were made possible as a result of an award from the UK government Department of Employment. Money from an Enterprise in Higher Education grant funded a range of programmes, one of which was designed to introduce students to selected aspects of informatics and to demonstrate what is feasible in the undergraduate curriculum. The work carried out over a period of three and a half years was intended to provide the basis for the next phase of curriculum development. However, in the wake of the restructuring which has taken place in London medical colleges, the Informatics Department at what was St Bartholomew's has relocated to University College London Medical School, and is now called The Centre for Health Informatics and Multiprofessional Education (CHIME). University College is designing a new medical curriculum and CHIME is drawing on the experience gained through the Enterprise Project to find the best way to integrate informatics into this curriculum.

  16. Joint Applications Pilot of the National Climate Predictions and Projections Platform and the North Central Climate Science Center: Delivering climate projections on regional scales to support adaptation planning

    Science.gov (United States)

    Ray, A. J.; Ojima, D. S.; Morisette, J. T.

    2012-12-01

    The DOI North Central Climate Science Center (NC CSC) and the NOAA/NCAR National Climate Predictions and Projections (NCPP) Platform and have initiated a joint pilot study to collaboratively explore the "best available climate information" to support key land management questions and how to provide this information. NCPP's mission is to support state of the art approaches to develop and deliver comprehensive regional climate information and facilitate its use in decision making and adaptation planning. This presentation will describe the evolving joint pilot as a tangible, real-world demonstration of linkages between climate science, ecosystem science and resource management. Our joint pilot is developing a deliberate, ongoing interaction to prototype how NCPP will work with CSCs to develop and deliver needed climate information products, including translational information to support climate data understanding and use. This pilot also will build capacity in the North Central CSC by working with NCPP to use climate information used as input to ecological modeling. We will discuss lessons to date on developing and delivering needed climate information products based on this strategic partnership. Four projects have been funded to collaborate to incorporate climate information as part of an ecological modeling project, which in turn will address key DOI stakeholder priorities in the region: Riparian Corridors: Projecting climate change effects on cottonwood and willow seed dispersal phenology, flood timing, and seedling recruitment in western riparian forests. Sage Grouse & Habitats: Integrating climate and biological data into land management decision models to assess species and habitat vulnerability Grasslands & Forests: Projecting future effects of land management, natural disturbance, and CO2 on woody encroachment in the Northern Great Plains The value of climate information: Supporting management decisions in the Plains and Prairie Potholes LCC. NCCSC's role in

  17. Pilot remediation of sediment from the Petroleum harbour in Amsterdam

    International Nuclear Information System (INIS)

    Hakstege, A.L.; Geldermalsen, L.A. van

    1998-01-01

    The Petroleum Harbour project is the third pilot remediation, which was carried out within the framework of POSW (the national development programme for treatment processes of polluted sediments). The main objectives of the pilot remediation are: to demonstrate the biological treatment of dredged materials on a practical scale; and to gain knowledge and experience for the future remediation of the total Petroleum harbour. A strict tender procedure was carefully executed in order to select the most effective and 'state of the art' biodegradation technology. The selected remediation chain was a combination of 'standard' soil treatment technology and newly developed biotechnology. Dredging, biotechnological treatment and the effects of the remediation on the environment were monitored in detail. The quality of the treated sand fraction complied with the Dutch standards for re-use and was actually applied in a project of Rijkswaterstaat. Biodegradation resulted in a substantial decrease of the oil and PAH's contents, but due to the lack of breakdown of a few high-molecular PAH's, the quality requirements of the contract were not achieved. It is concluded that the two main objectives of the project have been attained. Finally some recommendations for the future clean-up of the Petroleum harbour are given. (author)

  18. Community-Based Vocational Rehabilitation (CBVR) for People with Disabilities: Experiences from a Pilot Project in Nigeria

    Science.gov (United States)

    Alade, Eunice B.

    2004-01-01

    This article discusses the community-based vocational rehabilitation (CBVR) of persons with disabilities. In 1991, a pilot project was instituted by the International Labour Organisation and the United Nations Development Programme in conjunction with Oyo State Government in Nigeria. The aim was to facilitate the reintegration of persons with…

  19. Human Development across the Lifespan. A Pilot Intergenerational Project in Three Pennsylvania School Districts. Final Evaluation.

    Science.gov (United States)

    Ward, Christopher R.; Balavage, Valerie

    An evaluation determined the impact on participants of pilot intergenerational programs in the Central Greene, Quaker Valley, and Titusville school districts in western Pennsylvania. It examined how participation in project activities changed students' attitudes about older adults and aging. A four-part questionnaire consisted of the following:…

  20. Research Data Curation Pilots: Lessons Learned

    Directory of Open Access Journals (Sweden)

    David Minor

    2014-07-01

    Full Text Available In the spring of 2011, the UC San Diego Research Cyberinfrastructure (RCI Implementation Team invited researchers and research teams to participate in a research curation and data management pilot program. This invitation took the form of a campus-wide solicitation. More than two dozen applications were received and, after due deliberation, the RCI Oversight Committee selected five curation-intensive projects. These projects were chosen based on a number of criteria, including how they represented campus research, varieties of topics, researcher engagement, and the various services required. The pilot process began in September 2011, and will be completed in early 2014. Extensive lessons learned from the pilots are being compiled and are being used in the on-going design and implementation of the permanent Research Data Curation Program in the UC San Diego Library. In this paper, we present specific implementation details of these various services, as well as lessons learned. The program focused on many aspects of contemporary scholarship, including data creation and storage, description and metadata creation, citation and publication, and long term preservation and access. Based on the lessons learned in our processes, the Research Data Curation Program will provide a suite of services from which campus users can pick and choose, as necessary. The program will provide support for the data management requirements from national funding agencies.

  1. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  2. High-level-waste records management system: the NRC pilot project

    International Nuclear Information System (INIS)

    Bender, A.; Altomare, P.

    1987-01-01

    The US Nuclear Regulatory Commission (NRC) and the US Dept. of Energy (DOE) have agreed to develop a licensing support system (LSS) to address the records management requirements created by the Nuclear Waste Policy Act (NWPA). The NRC is planning to conduct a negotiated rule making the modify 10CFR2, including rules governing discovery, so that parties to the licensing process will use a single information management system as a source for all licensing-related documents. The successful demonstration of the pilot project has resulted in an operational on-line record management system for NRC-related HLW documents. Both incoming and outgoing documents are being scanned and stored on a mainframe system and on an optical disk. At this writing the optical disk portion of the system is being tested to evaluate its potential use as a future archival and distribution medium for licensing records. Experience gained from this project is being shared with other government agencies that are in the process of using similar technologies to come to grips with the complex records management problem endemic to our information-based society

  3. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  4. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Protocols and Pilot Studies

    Science.gov (United States)

    Rosenzweig, C.; Jones, J. W.; Hatfield, J. L.; Ruane, A. C.; Boote, K. J.; Thorburn, P.; Antle, J. M.; Nelson, G. C.; Porter, C.; Janssen, S.; hide

    2012-01-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a major international effort linking the climate, crop, and economic modeling communities with cutting-edge information technology to produce improved crop and economic models and the next generation of climate impact projections for the agricultural sector. The goals of AgMIP are to improve substantially the characterization of world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. Analyses of the agricultural impacts of climate variability and change require a transdisciplinary effort to consistently link state-of-the-art climate scenarios to crop and economic models. Crop model outputs are aggregated as inputs to regional and global economic models to determine regional vulnerabilities, changes in comparative advantage, price effects, and potential adaptation strategies in the agricultural sector. Climate, Crop Modeling, Economics, and Information Technology Team Protocols are presented to guide coordinated climate, crop modeling, economics, and information technology research activities around the world, along with AgMIP Cross-Cutting Themes that address uncertainty, aggregation and scaling, and the development of Representative Agricultural Pathways (RAPs) to enable testing of climate change adaptations in the context of other regional and global trends. The organization of research activities by geographic region and specific crops is described, along with project milestones. Pilot results demonstrate AgMIP's role in assessing climate impacts with explicit representation of uncertainties in climate scenarios and simulations using crop and economic models. An intercomparison of wheat model simulations near Obregón, Mexico reveals inter-model differences in yield sensitivity to [CO2] with model uncertainty holding approximately steady as concentrations rise, while uncertainty related to choice of crop model increases with

  5. PROBABILISTIC INTEREST RATE SETTING WITH A SHADOW BOARD: A DESCRIPTION OF THE PILOT PROJECT

    OpenAIRE

    TIMO HENCKEL; SHAUN VAHEY; LIZ WAKERLY

    2011-01-01

    This study aims to assess the scope for monetary policymakers to aggregate probabilistic interest rate advice. The members of a Shadow Board give probabilistic assessments of the appropriate (target) interest rate for Australia in real time. The pilot project will be running each month from August to December (inclusive) 2011, with the Shadow Board giving advice shortly before each decision by the Reserve Bank of Australia (RBA) Board.

  6. Alberta Learning: Early Development Instrument Pilot Project Evaluation.

    Science.gov (United States)

    Meaney, Wanda; Harris-Lorenze, Elayne

    The Early Development Instrument (EDI) was designed by McMaster University to measure the outcomes of childrens early years as they influence their readiness to learn at school. The EDI was piloted in several Canadian cities in recent years through two national initiatives. Building on these initiatives, Alberta Learning piloted the EDI as a…

  7. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  8. The astronaut of 1988. [training and selection

    Science.gov (United States)

    Slayton, D. K.

    1973-01-01

    Past space exploration history is reviewed for a projection of requirements in astronaut training and selection in 1988. The categories of talent required for those space missions are listed as test pilots and operational pilots for the test phase of programs; flight engineers and mechanics for Space Shuttle and Space Stations; medical doctors as experimentators and crew members; medical technicians and nurses for support medical service; veterinarians and veterinary technicians; physisits, chemists and geologists; and military men and administrators. Multinational crews and participation of both sexes are anticipated.

  9. Doing A Pilot Study: Why Is It Essential?

    OpenAIRE

    Hassan, Zailinawati Abu; Schattner, Peter; Mazza, Danielle

    2006-01-01

    A pilot study is one of the essential stages in a research project. This paper aims to describe the importance of and steps involved in executing a pilot study by using an example of a descriptive study in primary care. The process of testing the feasibility of the project proposal, recruitment of subjects, research tool and data analysis was reported. We conclude that a pilot study is necessary and useful in providing the groundwork in a research project.

  10. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  11. Feasibility and pilot study of the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project.

    Science.gov (United States)

    Sun, Lena S; Li, Guohua; DiMaggio, Charles J; Byrne, Mary W; Ing, Caleb; Miller, Tonya L K; Bellinger, David C; Han, Sena; McGowan, Francis X

    2012-10-01

    Animal studies have documented that exposure of the developing brain to commonly used anesthetic agents induces neurotoxicity and late abnormal neurobehavioral functions as adults. Results from clinical studies have all been analyzed using existing data sets, and these studies produced inconsistent results. To provide more definitive evidence to address the clinical relevance of anesthetic neurotoxicity in children, an interdisciplinary team of investigators designed and developed the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project. We present pilot study results in 28 sibling pairs recruited and tested at the Columbia University Medical Center (CUMC) and Children's Hospital of Boston (CHB) for the PANDA project. The PANDA project uses an ambidirectional cohort design. We performed prospective neuropsychological assessment in 28 exposed-unexposed sibling pairs from 6 to 11 years of age. The exposed siblings were ASA 1 or 2 and had received a single episode of anesthesia for inguinal hernia repair before the age of 36 months and the unexposed siblings had no anesthesia before the age of 36 months. All the sibling pairs were English speaking and were 36 weeks of gestational age or older. Each sibling pair underwent a direct testing using the Wechsler Abbreviated Scale of Intelligence (WASI) and the NEuroPSYchological Assessment, second edition (NEPSY II), and the parents completed questionnaires related to behavior using CBCL and Conners rating. Data are presented as means±SD. We conducted descriptive analyses of the demographic data. We compared both the exposed and the unexposed sibling groups on WASI and NEPSY II, and total and T scores from CBCL and Conners rating were analyzed as continuous data using the paired t test between the two groups. A PPANDA study protocol was implemented to perform a pilot feasibility study. Our success rate was 96.7% in obtaining detailed medical and anesthesia records in our historical cohort. The scores for verbal

  12. Articulated vehicles of 25 meter and 60 ton in The Netherlands: the start of a pilot project

    NARCIS (Netherlands)

    Hoogvelt, R.B.J.; Huijbers, J.J.W.

    1998-01-01

    At this moment the total allowable length of an articulated vehicle in The Netherlands is 18.35 meter and its total weight is 50 ton. Several Dutch transportation organisations requested a pilot project with longer and heavier vehicles for heavy goods transpotation. Because of the environmental

  13. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    OpenAIRE

    Duim, van der, V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that the tangible results in terms of pro-poor tourism of the project itself were meagre, as, initially, only three and later only one out of 24 projects was included in the tourism chain. However, the an...

  14. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  15. Incorporating the Six Core Elements of Health Care Transition Into a Medicaid Managed Care Plan: Lessons Learned From a Pilot Project.

    Science.gov (United States)

    McManus, Margaret; White, Patience; Pirtle, Robin; Hancock, Catina; Ablan, Michael; Corona-Parra, Raquel

    2015-01-01

    This pediatric-to-adult health care transition pilot project describes the process and results of incorporating the "Six Core Elements of Health Care Transition (2.0)" into a Medicaid managed care plan with a group of 35 18-23 year olds who have chronic mental health, developmental, and complex medical conditions. The pilot project demonstrated an effective approach for customizing and delivering recommended transition services. At the start of the 18-month project, the Medicaid plan was at the basic level (1) of transition implementation of the Six Core Elements with no transition policy, member transition readiness assessment results, health care transition plans of care, updated medical summaries, transfer package for the adult-focused provider, and assurance of transfer completion and consumer feedback. At the conclusion of the pilot project, the plan scored at level 3 on each core element. The primary reason for not scoring at the highest level (4) was because the transition elements have not been incorporated into services for all enrollees within the plan. Future efforts in managed care will benefit from starting the transition process much earlier (ages 12-14), expanding the role of nurse care managers and participating pediatric and adult-focused clinicians in transition, and offering payment incentives to clinicians to implement the Six Core Elements of Health Care Transition. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  17. [Postgraduate training for specialists in psychiatry and psychotherapy. Problem-based learning - evaluation of a pilot project].

    Science.gov (United States)

    Rufer, M; Schnyder, U; Schirlo, C; Wengle, H; Gerke, W

    2011-05-01

    Problem-based learning (PBL) emphasizes the student's individual needs, their ability to solve complex clinical problems, and a professional attitude that facilitates communication among colleagues. Thus, PBL appears to provide a perfectly suitable didactic format for postgraduate training of medical specialties. To date, it is only rarely used in this area though. In a pilot project, we implemented PBL into the curriculum of postgraduate training in psychiatry and psychotherapy, and evaluated the program over a period of 12 months, using structured questionnaires. A total of 41 PBL courses were held, with 447 residents participating. Participants as well as tutors assessed 19 of 21 aspects as good or very good (5-point Likert scale, mean value >4). Overall, PBL was rated as highly suitable for advanced training (participants: 4.5±0.8; tutors: 5.0±0.2). The results of this pilot project suggest that PBL might be a useful element of multifaceted advanced training programs, strengthening their practical component and the applicability of knowledge in the daily clinical routine.

  18. Future-oriented computerized information system for power plant process control in a pilot project at Philippsburg nuclear power plant

    International Nuclear Information System (INIS)

    Woehrle, G.; Kraft, M.

    1988-01-01

    The motivation for the pilot project at Philippsburg nuclear power plant resulted from the Three Mile Island accident in 1979. The primary task embraces an efficient computer-aided reduction of information when a fault occurs based on a process engineering analysis of the information accrued. Accompanying this are a consolidation and evaluation of the information available in the control room. In this pilot project the new tasks of status monitoring, information reduction and operationalcontrol have been realized for the first time using a computer-aided process information system. In addition to the existing control computer, an information computer with approximately 1200 analogue and about 10000 binary signals has been installed. The installation of the system was completed in 1984 and in the meantime initial operational experience has become available. (orig.) [de

  19. DOING A PILOT STUDY: WHY IS IT ESSENTIAL?

    Directory of Open Access Journals (Sweden)

    Zailinawati Abu Hassan

    2006-01-01

    Full Text Available A pilot study is one of the essential stages in a research project. This paper aims to describe the importance of and steps involved in executing a pilot study by using an example of a descriptive study in primary care. The process of testing the feasibility of the project proposal, recruitment of subjects, research tool and data analysis was reported. We conclude that a pilot study is necessary and useful in providing the groundwork in a research project.

  20. The Dance Within: A Pilot Project in Dance for the Handicapped and Teaching Dance for the Handicapped: A Curriculum Guide.

    Science.gov (United States)

    Michigan Dance Association, Lansing.

    The Michigan Dance Association's Dance Project for the Handicapped is the subject of the two pamphlets that make up this document. The first pamphlet, "The Dance Within," describes the history, nature and goals of the Jackson Pilot Project, the first handicapped dance program in Michigan; it also offers suggestions on how to set up similar…

  1. Identification and analysis of functional elements in 1% of the human genome by the ENCODE pilot project

    DEFF Research Database (Denmark)

    Birney, Ewan; Stamatoyannopoulos, John A; Dutta, Anindya

    2007-01-01

    We report the generation and analysis of functional data from multiple, diverse experiments performed on a targeted 1% of the human genome as part of the pilot phase of the ENCODE Project. These data have been further integrated and augmented by a number of evolutionary and computational analyses...

  2. Experiences from a pilot study on how to conduct a qualitative multi-country research project regarding use of antibiotics in Southeast Europe

    DEFF Research Database (Denmark)

    Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall

    2016-01-01

    regarding how to conduct these types of research projects by evaluating a pilot study of the project. METHODS: Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused......BACKGROUND: In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations......) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge...

  3. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  4. The impact of transition training on adapting to Technically Advanced Aircraft at regional airlines: Perceptions of pilots and instructor pilots

    Science.gov (United States)

    di Renzo, John Carl, Jr.

    Scope and method of study. The purpose of this study was to test a hypothesis about pilot and instructor pilot perceptions of how effectively pilots learn and use new technology, found in Technically Advanced Aircraft (TAA), given initial type of instrumentation training. New aviation technologies such as Glass Cockpits in technically advanced aircraft are complex and can be difficult to learn and use. The research questions focused on the type of initial instrumentation training to determine the differences among pilots trained using various types of instrumentation ranging from aircraft equipped with traditional analog instrumentation to aircraft equipped with glass cockpits. A convenience sample of Pilots in Training (PT) and Instructor Pilots (IP) was selected from a regional airline. The research design used a mixed methodology. Pilots in training completed a thirty-two question quantitative questionnaire and instructor pilots completed a five question qualitative questionnaire. Findings and conclusions. This investigation failed to disprove the null hypothesis. The type of instrumentation training has no significant effect on newly trained regional airline pilot perceived ability to adapt to advanced technology cockpits. Therefore, no evidence exists from this investigation to support the early introduction and training of TAA. While the results of this investigation were surprising, they are nonetheless, instructive. Even though it would seem that there would be a relationship between exposure to and use of technically advanced instrumentation, apparently there was no perceived relationship for this group of airline transport pilots. However, a point of interest is that these pilots were almost evenly divided in their opinion of whether or not their previous training had prepared them for transition to TAA. The majority also believed that the type of initial instrumentation training received does make a difference when transitioning to TAA. Pilots believed

  5. Radioactive waste disposal: Waste isolation pilot plants (WIPP). (Latest citations from the NTIS Bibliographic database). Published Search

    International Nuclear Information System (INIS)

    1993-09-01

    The bibliography contains citations concerning the Waste Isolation Pilot Plant (WIPP), a geologic repository located in New Mexico for transuranic wastes generated by the U.S. Government. Articles follow the development of the program from initial site selection and characterization through construction and testing, and examine research programs on environmental impacts, structural design, and radionuclide landfill gases. Existing plants and facilities, pilot plants, migration, rock mechanics, economics, regulations, and transport of wastes to the site are also included. The Salt Repository Project and the Crystalline Repository Project are referenced in separate bibliographies. (Contains a minimum of 228 citations and includes a subject term index and title list.)

  6. The Pilot Staffing Conundrum: A Delphi Study

    Science.gov (United States)

    2009-06-01

    Project, AFIT/ GMO /LAL/98J-2. School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright Patterson AFB, OH, June...Kafer, John H. Relationship of Airline Pilot Demand and Air Force Pilot Retention. Graduate Research Project, AFIT/ GMO /LAL/98J-11. School of Logistics

  7. Evaluation of the Influence of Selected Factors on a Successful ERP Software Implementation

    Directory of Open Access Journals (Sweden)

    Grażyna Hołodnik-Janczura

    2010-01-01

    Full Text Available Based on a pilot study, a list of critical success factors for an IT project was developed. These factors were subjected to statistical analysis on the basis of the results of a questionnaire. Two samples of projects, called "success" and "failure" respectively, were analysed. The groups were distinguished in order to evaluate the influence of selected factors on the success of an implementation project. Furthermore, a non-parametric test was applied, in order to conduct statistical data analysis, which confirmed the influence of the majority of the selected factors on the success of an implementation project. (original abstract

  8. A Pilot Astronomy Outreach Project in Bangladesh

    Science.gov (United States)

    Bhattacharya, Dipen; Mridha, Shahjahan; Afroz, Maqsuda

    2015-08-01

    In its strategic planning for the "Astronomy for Development Project," the International Astronomical Union (IAU) has ecognized, among other important missions, the role of astronomy in understanding the far-reaching possibilities for promoting global tolerance and citizenship. Furthermore, astronomy is deemed inspirational for careers in science and technology. The "Pilot Astronomy Outreach Project in Bangladesh"--the first of its kind in the country--aspires to fulfill these missions. As Bangladesh lacks resources to promote astronomy education in universities and schools, the role of disseminating astronomy education to the greater community falls on citizen science organizations. One such group, Anushandhitshu Chokro (AChokro) Science Organization, has been carrying out a successful public outreach program since 1975. Among its documented public events, AChokro organized a total solar eclipse campaign in Bangladesh in 2009, at which 15,000 people were assembled in a single open venue for the eclipse observation. The organization has actively pursued astronomy outreach to dispel public misconceptions about astronomical phenomena and to promote science. AChokro is currently working to build an observatory and Science Outreach Center around a recently-acquired 14-inch Scmidt-Cassegrain telescope and a soon-to-be-acquired new 16-inch reflector, all funded by private donations. The telescopes will be fitted with photometers, spectrometers, and digital and CCD cameras to pursue observations that would include sun spot and solar magnetic fields, planetary surfaces, asteroid search, variable stars and supernovae. The Center will be integrated with schools, colleges, and community groups for regular observation and small-scale research. Special educational and observing sessions for adults will also be organized. Updates on the development of the Center, which is expected to be functioning by the end of 2015, will be shared and feedback invited on the fostering of

  9. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  10. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  11. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  12. Characteristics of Difficult-to-Place Youth in State Custody: A Profile of the Exceptional Care Pilot Project Population

    Science.gov (United States)

    Armour, Marilyn P.; Schwab, James

    2007-01-01

    This study examines the characteristics of Texas youth designated as "most difficult to place" recipients of service under the "Exceptional Care Pilot Project" (N = 46). Findings include, among others, high levels of comorbid psychiatric disturbance (greater than 3 diagnostic groupings), physical (78.3%) and sexual (88%)…

  13. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  14. Rand Symposium on Pilot Training and the Pilot Career. (Santa Monica, Calif., Feb. 23-27, 1970).

    Science.gov (United States)

    Stewart, W. A.; Wainstein, E. S.

    This document contains discussions of the following: The pilot career; Career and education; The pilot skill--definition, measurement, and retention; Relevance of training to combat; Selection; Motivation; Training innovations and the role of research; Simulators; The instructor pilot; Topics for research. (Author/CK)

  15. Greenhouse gas emissions of pilot buildings in 2009-2011; Pilottikiinteistoejen kasvihuonekaasupaeaestoet vuosina 2009-2011

    Energy Technology Data Exchange (ETDEWEB)

    Riihimaki, M.

    2012-07-01

    The Julia 2030 use of premises project sought to reduce the greenhouse gas emissions of selected pilot buildings by 10 per cent over the period from 2009 to 2011 by changing patterns of use. The project also provided an opportunity for further refinement of a climate calculator developed and maintained by WWF for reckoning greenhouse gas emissions of this kind. The use of premises project covered a total of 32 pilot buildings in Helsinki, Espoo, Vantaa, Kauniainen, Kirkkonummi and Kerava. These buildings included nurseries and schools, swimming baths, offices, multi-purpose activity buildings, depots, a sports hall and a health centre. The combined greenhouse gas emissions of the pilot buildings in 2011 amounted to 10,416 tCO{sub 2}e, which was 8 per cent lower than the total of 11,293 tCO{sub 2}e recorded in 2009. This means that the project fell slightly short of its targeted 10 per cent reduction in greenhouse gas emissions. The total greenhouse gas emissions of the pilot buildings adjusted for heating requirement amounted to 10,733 tCO{sub 2}e in 2011, which was about 7 per cent lower than in 2009. Reckoned on a per capita basis for employees or visitors, the total greenhouse gas emissions adjusted for heating requirement fell in 25 buildings, but increased in seven buildings over the period from 2009 to 2011. Particularly significant emission reductions were achieved in Vantaa, where all buildings were able to cut their emissions by between 9 and 45 per cent. The principal cause of greenhouse gas emissions in the pilot buildings was heating consumption, which also accounts for the increase in their unadjusted greenhouse gas emissions over the cold winters of 2009 and 2010. The second most important emission source in the pilot buildings was electricity consumption. Air travel contributed significantly to the overall greenhouse gas emissions of the pilot buildings used by employees taking work-related flights, whereas the contribution of paper consumption and

  16. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  17. Large Pilot-Scale Carbon Dioxide (CO2) Capture Project Using Aminosilicone Solvent.Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hancu, Dan [General Electric Company, Niskayuna, NY (United States)

    2017-12-21

    GE Global Research has developed, over the last 8 years, a platform of cost effective CO2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in previous funded DOE projects (DE-FE0007502 and DEFE0013755), the GAP-1m solvent has increased CO2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. Performance of the GAP-1m solvent was recently demonstrated in a 0.5 MWe pilot at National Carbon Capture Center, AL with real flue gas for over 500 hours of operation using a Steam Stripper Column (SSC). The pilot-scale PSTU engineering data were used to (i) update the techno-economic analysis, and EH&S assessment, (ii) perform technology gap analysis, and (iii) conduct the solvent manufacturability and scale-up study.

  18. Model-Based Systems Engineering Pilot Program at NASA Langley

    Science.gov (United States)

    Vipavetz, Kevin G.; Murphy, Douglas G.; Infeld, Samatha I.

    2012-01-01

    NASA Langley Research Center conducted a pilot program to evaluate the benefits of using a Model-Based Systems Engineering (MBSE) approach during the early phase of the Materials International Space Station Experiment-X (MISSE-X) project. The goal of the pilot was to leverage MBSE tools and methods, including the Systems Modeling Language (SysML), to understand the net gain of utilizing this approach on a moderate size flight project. The System Requirements Review (SRR) success criteria were used to guide the work products desired from the pilot. This paper discusses the pilot project implementation, provides SysML model examples, identifies lessons learned, and describes plans for further use on MBSE on MISSE-X.

  19. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    NARCIS (Netherlands)

    Duim, van der V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that

  20. Cosmic radiation and airline pilots: Exposure pattern as a function of aircraft type

    International Nuclear Information System (INIS)

    Tveten, U.; Haldorsen, T.; Reitan, J.

    2000-01-01

    The project presented here has been carried out as part of an epidemiological project on Norwegian aircraft personnel, entitled 'Exposure to low level ionising radiation and incidence of cancer in airline pilots and crew'. The purpose of the main project is to determine if there may be a relationship between exposure to cosmic radiation at aircraft cruising altitudes and the incidence of cancer. The methodology used as basis for estimating the radiation exposures is presented. The information used as basis for the dose estimations comes from a variety of sources: the files at the Personnel Licensing Section and the Aviation Medical Section of Norwegian Aviation Administration, the route tables of Scandinavian Airlines System (SAS), large amounts of expert information contributed by members of the Pilot's Associations in Norway and a couple of non-Norwegian pilots and from other members of the staff of SAS and other airlines. The estimation for each pilot was based on individual information of annual block hours and an estimated dose rate for each type of aircraft. The latter was estimated as a weighted average of CARI-estimated doses on a selection of routes flown by the airplanes in the different time periods. The project includes all pilots that have been licensed in Norway since 1946. These pilots have been flying a large variety of different types of aircraft and routes. The cosmic radiation intensity is a function of altitude in the atmosphere and, less markedly, of geographical latitude and of the intensity of the radiation from the sun (quantified as the heliocentric potential). Different types of aircraft fly at different altitudes and are used for different purposes (passenger traffic, cargo, air photography, preparation of maps etc) and used on different routes. The end results of the project described in this article are radiation exposures per block hour for each type of aircraft, and for each individual year (the differences between years reflect the

  1. Job Sharing Pilot Project in the Department of Education: Final Evaluation. A Report to the Legislature of the State of Hawaii. No. 81-10.

    Science.gov (United States)

    Tanimura, Clinton T.

    Evaluation of a three-year pilot project in the Hawaii Department of Education focused on the extent to which it demonstrated the feasibility of job sharing as an employment alternative for classroom teachers. It also assessed project effectiveness, examined costs incurred by the project, and analyzed job sharing as a permanent employment option…

  2. A Pilot for Improving Depression Care on College Campuses: Results of the College Breakthrough Series-Depression (CBS-D) Project

    Science.gov (United States)

    Chung, Henry; Klein, Michael C.; Silverman, Daniel; Corson-Rikert, Janet; Davidson, Eleanor; Ellis, Patricia; Kasnakian, Caroline

    2011-01-01

    Objective: To implement a pilot quality improvement project for depression identification and treatment in college health. Participants: Eight college health center teams composed primarily of primary care and counseling service directors and clinicians. Methods: Chronic (Collaborative) Care Model (CCM) used with standardized screening to…

  3. ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Field, K.; Punjabi, S.

    2014-08-01

    In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

  4. Pilot and pilot-commercial plants for reprocessing spent fuels of FBR type reactors

    International Nuclear Information System (INIS)

    Shaldaev, V.S.; Sokolova, I.D.

    1988-01-01

    A review of modern state of investigations on the FBR mixed oxide uranium-plutonium fuel reprocessing abroad is given. Great Britain and France occupy the leading place in this field, operating pilot plants of 5 tons a year capacity. Technology of spent fuel reprocessing and specific features of certain stages of the technological process are considered. Projects of pilot and pilot-commercial plants of Great Britain, France, Japan, USA are described. Economic problems of the FBR fuel reprocessing are touched upon

  5. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  6. The Pilot Lunar Geologic Mapping Project: Summary Results and Recommendations from the Copernicus Quadrangle

    Science.gov (United States)

    Skinner, J. A., Jr.; Gaddis, L. R.; Hagerty, J. J.

    2010-01-01

    The first systematic lunar geologic maps were completed at 1:1M scale for the lunar near side during the 1960s using telescopic and Lunar Orbiter (LO) photographs [1-3]. The program under which these maps were completed established precedents for map base, scale, projection, and boundaries in order to avoid widely discrepant products. A variety of geologic maps were subsequently produced for various purposes, including 1:5M scale global maps [4-9] and large scale maps of high scientific interest (including the Apollo landing sites) [10]. Since that time, lunar science has benefitted from an abundance of surface information, including high resolution images and diverse compositional data sets, which have yielded a host of topical planetary investigations. The existing suite of lunar geologic maps and topical studies provide exceptional context in which to unravel the geologic history of the Moon. However, there has been no systematic approach to lunar geologic mapping since the flight of post-Apollo scientific orbiters. Geologic maps provide a spatial and temporal framework wherein observations can be reliably benchmarked and compared. As such, a lack of a systematic mapping program means that modern (post- Apollo) data sets, their scientific ramifications, and the lunar scientists who investigate these data, are all marginalized in regard to geologic mapping. Marginalization weakens the overall understanding of the geologic evolution of the Moon and unnecessarily partitions lunar research. To bridge these deficiencies, we began a pilot geologic mapping project in 2005 as a means to assess the interest, relevance, and technical methods required for a renewed lunar geologic mapping program [11]. Herein, we provide a summary of the pilot geologic mapping project, which focused on the geologic materials and stratigraphic relationships within the Copernicus quadrangle (0-30degN, 0-45degW).

  7. TOLD LIKE IT IS! AN EVALUATION OF AN INTEGRATED ORAL DEVELOPMENT PILOT PROJECT

    Directory of Open Access Journals (Sweden)

    David Barr

    2005-09-01

    Full Text Available Much established pedagogical and CALL (computer-assisted language learning research advocates an integrated constructivist approach to the use of technology in language learning. This paper reports on a pilot project delivered to first year undergraduate French students. The project aim was to deliver a blend of collaborative and individual learning through a combination of CALL programs and online activities alongside traditional face-to-face conversation classes. Using quantitative analysis of a pre- and posttest and a variety of questionnaires, this project assessed student progress in developing oral skills across two groups, one (the treatment group using technology and the other (the comparison group being a traditional conversation class. Each group covered the same content and underwent the same assessment procedures. In addition, through qualitative analysis measures, the project evaluated the role played by additional variables in the learning process, as well as student and staff reactions to the two approaches. The study concludes by showing that while progress was made by both groups, the progress made by those not using technology was significantly greater than that made by students using technology over a short-term study. It also highlights the need for developing pedagogy to ensure that CALL-based teaching goes beyond rehearsal activity to achieve message-orientated communication.

  8. EPA’s Summary Report of the Collaborative Green Infrastructure Pilot Project for the Middle Blue River in Kansas City, MO

    Science.gov (United States)

    The United States Environmental Protection Agency evaluated the performance of a hybrid green-gray infrastructure pilot project installed into the Marlborough Neighborhood by the Kansas City Water Services Department. Kansas City installed 135 vegetated SCMs, 24,290 square feet o...

  9. SMS picture messaging as an adjunct in emergency medicine training – pilot project on feasibility in an African healthcare system

    Directory of Open Access Journals (Sweden)

    R. Lynch*

    2013-12-01

    Conclusion: This pilot project proved very popular with participants and trainers. Technical issues proved frustrating at times and together with cost are likely to pose difficulties for its widespread use in EM training in Africa. It is worthwhile exploring this further.

  10. National Conversion Pilot Project Waste Management Program

    International Nuclear Information System (INIS)

    Engelmann, G.G.; Simmons, M.S.

    1995-01-01

    The U.S. Department of Energy facilities are in the process of downsizing. Most plans for downsizing focus on the decontamination and decommissioning of excess production facilities. A different approach for downsizing is taken at Rocky Flats Environmental Technology Site (RFETS), which has four production buildings. These buildings were used for the production of weapons components from uranium and beryllium and contain unique and valuable equipment, such as rolling mills, furnaces, and high-capacity presses, which could be utilized for stage-III metal recycling. The mission of this National Conversion Pilot Project (NCPP) open-quotes is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities.close quotes The NCPP has been divided into three stages: 1. Stage I-planning and feasibility determination 2. Stage II-facility cleanup for reuse and operational assessment 3. Stage III-metals recycling. The NCPP has recently been approved to begin stage II. The objective of the NCPP stage II is to prepare the four NCPP buildings for stage III, to remove unwanted equipment, and to decontaminate buildings and essential equipment to levels consistent with those that commercial industrial operations must meet pursuant to applicable Occupational Safety and Health Administration, U.S. Environmental Protection Agency, U.S. Nuclear Regulatory Commission, and state workplace regulations

  11. Grouts and concretes for the Waste Isolation Pilot Project (WIPP)

    International Nuclear Information System (INIS)

    Wakeley, L.D.

    1990-01-01

    The Structures Laboratory of the U.S. Army Engineer Waterways Experiment Station has conducted research on cement-based composites for the Waste Isolation Pilot Project (WIPP) since 1977, in cooperation with Sandia National Laboratories. Field testing requirements guided initial development of grouts. Concurrent and later laboratory studies explored the chemical stability and probable durability of these mixtures. Beginning in 1985, a series of small-scale seal performance tests at the WIPP prompted development of an expansive salt-saturated concrete. Important lessons learned from this ongoing work include: (1) carefully tailored mixtures can tolerate phase changes involving Ca, Al, and SO 4 , without loss of structural integrity; (2) handling and placement properties are probably more crucial to the mixtures than is exact phase composition; and (3) for the environment of a geologic repository, demonstrated chemical durability will be the best indicator of long-term performance

  12. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and

  13. Roll paper pilot. [mathematical model for predicting pilot rating of aircraft in roll task

    Science.gov (United States)

    Naylor, F. R.; Dillow, J. D.; Hannen, R. A.

    1973-01-01

    A mathematical model for predicting the pilot rating of an aircraft in a roll task is described. The model includes: (1) the lateral-directional aircraft equations of motion; (2) a stochastic gust model; (3) a pilot model with two free parameters; and (4) a pilot rating expression that is a function of rms roll angle and the pilot lead time constant. The pilot gain and lead time constant are selected to minimize the pilot rating expression. The pilot parameters are then adjusted to provide a 20% stability margin and the adjusted pilot parameters are used to compute a roll paper pilot rating of the aircraft/gust configuration. The roll paper pilot rating was computed for 25 aircraft/gust configurations. A range of actual ratings from 2 to 9 were encountered and the roll paper pilot ratings agree quite well with the actual ratings. In addition there is good correlation between predicted and measured rms roll angle.

  14. Cosmic radiation and airline pilots. Exposure patterns of Norwegian pilots flying aircraft not used by SAS

    International Nuclear Information System (INIS)

    Tveten, U.

    1997-05-01

    The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institutt for Energiteknikk (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). The project has been partially financed by the Norwegian Research Council. Originating from the Norwegian project, a number of similar projects have been started or are in the planning stage in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots flying a great diversity of different aircrafts. Aircrafts that appear in the time-tables of the Scandinavian Airline System (SAS) have been treated in an earlier report. The results presented in this report (radiation doserates for the different types of aircrafts in the different years) will, in a later stage of the project be utilized to estimate the individual radiation exposure histories. The major sources of information used as basis for the work in this report is information provided by several active pilots, members of the Pilots Associations, along with calculations performed using US Federal Aviation Administration's computer code CARI-3N. 2 refs

  15. Cosmic radiation and airline pilots. Exposure patterns of Norwegian pilots flying aircraft not used by SAS

    Energy Technology Data Exchange (ETDEWEB)

    Tveten, U.

    1997-05-01

    The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institutt for Energiteknikk (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). The project has been partially financed by the Norwegian Research Council. Originating from the Norwegian project, a number of similar projects have been started or are in the planning stage in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots flying a great diversity of different aircrafts. Aircrafts that appear in the time-tables of the Scandinavian Airline System (SAS) have been treated in an earlier report. The results presented in this report (radiation doserates for the different types of aircrafts in the different years) will, in a later stage of the project be utilized to estimate the individual radiation exposure histories. The major sources of information used as basis for the work in this report is information provided by several active pilots, members of the Pilots Associations, along with calculations performed using US Federal Aviation Administration`s computer code CARI-3N. 2 refs.

  16. Air pollution prevention through urban heat island mitigation: An update on the urban heat island pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Gorsevski, V.; Taha, H.; Quattrochi, D.; Luvall, J.

    1998-07-01

    Urban heat islands increase the demand for cooling energy and accelerate the formation of smog. They are created when natural vegetation is replaced by heat-absorbing surfaces such as building roofs and walls, parking lots, and streets. Through the implementation of measures designed to mitigate the urban heat island, communities can decrease their demand for energy and effectively cool the metropolitan landscape. In addition to the economic benefits, using less energy leads to reductions in emission of CO{sub 2}--a greenhouse gas--as well as ozone (smog) precursors such as NOx and VOCs. Because ozone is created when NOx and VOCs photochemically combine with heat and solar radiation, actions taken to lower ambient air temperature can significantly reduce ozone concentrations in certain areas. Measures to reverse the urban heat island include afforestation and the widespread use of highly reflective surfaces. To demonstrate the potential benefits of implementing these measures, EPA has teamed up with NASA and LBNL to initiate a pilot project with three US cities. As part of the pilot, NASA will use remotely-sensed data to quantify surface temperature, albedo, the thermal response number and NDVI vegetation of each city. This information will be used by scientists at Lawrence Berkeley National Laboratory (LBNL) along with other data as inputs to model various scenarios that will help quantify the potential benefits of urban heat island mitigation measures in terms of reduced energy use and pollution. This paper will briefly describe this pilot project and provide an update on the progress to date.

  17. JS3P: junior staff programme pilot project

    International Nuclear Information System (INIS)

    Pretrel, H.; Tregoures, N.; Bessiron, V.; Dehoyos, A.; Delvallee, I.; Brisson, N.; Debayle, C.; Dubreuil, M.; Nicaise, G.; Perignon, J.P.; Richard, J.; Reinke, N.; Kaulard, J.; Burgener, M.; Keesmann, S.; Schramm, B.; Seubert, A.; Sternkopf, J.; Thuma, G.; Weber, S.; Smidts, O.; Maillet, E.; Bucalossi, A.; Van haesendonck, M.; Uyttenhove, W.; Mertens, J.

    2006-01-01

    Concept: The objective of the project is to allow junior staff members from the European Technical Safety Organisations (TSOs), IRSN, GRS and AVN, to work together with the final goal of creating a junior staff network, based on technical, cultural and personal interests. These projects are to show junior staff members at a very early stage during their career the need for European collaborations. They are also a tool to explore new subjects of co-operation. It is an initiative that should strengthen the links between the organisations and contribute to establishing the future of nuclear safety in Europe. A JS3P (Junior Staff Programme Pilot Project) is a project done jointly by 'junior' staff members from the three TSOs, where experience of 'seniors' is also integrated when needed. Compared to other collaborative activities, it has certain specific features. The JS3P favours staff exchanges, and technical meetings of several days should be planned during a project in order to encourage people to work together. Technical objectives are shared and the work is done jointly (reports, articles). The team involved in the JS3P should be as small as possible to favour its efficiency. The JS3P is short and easy to realize. Its duration is fixed to a maximum of about 12 months with the option to be prolonged. Typical topics are bibliographic work, comparison issues, scientific surveys, benchmark exercises and prospective investigations on innovative ideas. They can be linked to existing joint projects and then form a smaller module integrated into the large project. Topics may concern prospective issues, tentatively investigating new topics that can be seen as exploratory co-operation projects. Subjects may also concern research issues that are not a priority but that deserve to be investigated as new attractive topics. The JS3P is defined and managed by junior staff members. It is approved by a management board committee and supervised by a technical steering committee

  18. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  19. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  20. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  1. The waste isolation pilot plant project: a changing paradigm

    International Nuclear Information System (INIS)

    Sheppard, L.E.; McFadden, M.H.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) repository that has been developed to demonstrate the safe and permanent isolation of transuranic radioactive wastes in a deep geologic site. It is located in 650 m below the surface in a bedded salt formation, and is designed to hold approximately 175,500 cubic meters of waste. Compliance with the regulations has become the principal focus for the Project. The scientific baseline is an important and integral part of the CCA, as it provides the foundation for conducting total system performance assessment calculations for comparison with applicable standards. The activities required to support the scientific baseline are being pursued in parallel to minimize the time required to collect, analyze, interpret and fully incorporate the results into the CCA. The DOE has shifted its approach to demonstrating compliance with the applicable regulations from a paradigm of a series of broad investigations to a new paradigm of highly focused activities conducted in parallel. The success of this approach will be assessed by the EPA when the application is critically reviewed

  2. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  3. Cosmic radiation and airline pilots: Exposure pattern as a function of aircraft type

    Energy Technology Data Exchange (ETDEWEB)

    Tveten, U.; Haldorsen, T.; Reitan, J

    2000-07-01

    The project presented here has been carried out as part of an epidemiological project on Norwegian aircraft personnel, entitled 'Exposure to low level ionising radiation and incidence of cancer in airline pilots and crew'. The purpose of the main project is to determine if there may be a relationship between exposure to cosmic radiation at aircraft cruising altitudes and the incidence of cancer. The methodology used as basis for estimating the radiation exposures is presented. The information used as basis for the dose estimations comes from a variety of sources: the files at the Personnel Licensing Section and the Aviation Medical Section of Norwegian Aviation Administration, the route tables of Scandinavian Airlines System (SAS), large amounts of expert information contributed by members of the Pilot's Associations in Norway and a couple of non-Norwegian pilots and from other members of the staff of SAS and other airlines. The estimation for each pilot was based on individual information of annual block hours and an estimated doserate for each type of aircraft. The latter was estimated as a weighted average of CARI-estimated doses on a selection of routes flown by the airplanes in the different time periods. The project includes all pilots that have been licensed in Norway since 1946. These pilots have been flying a large variety of different types of aircraft and routes. The cosmic radiation intensity is a function of altitude in the atmosphere and, less markedly, of geographical latitude and of the intensity of the radiation from the sun (quantified as the heliocentric potential). Different types of aircraft fly at different altitudes and are used for different purposes (passenger traffic, cargo, air photography, preparation of maps etc) and used on different routes. The end results of the project described in this article are radiation exposures per block hour for each type of aircraft, and for each individual year (the differences between years

  4. Technical support for universal health coverage pilots in Karnataka ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Technical support for universal health coverage pilots in Karnataka and Kerala. This project will provide evidence-based support to implement universal health coverage (UHC) pilot activities in two Indian states: Kerala and Karnataka. The project team will provide technical assistance to these early adopter states to assist ...

  5. Evaluation report. Pilot - Trondheim and Elverum : Energy labeling of houses; Evalueringsrapport. Pilot - Trondheim og Elverum : Energimerking av boliger

    Energy Technology Data Exchange (ETDEWEB)

    2009-05-15

    This report is an evaluation of the pilot project related to energy labeling of buildings. The document provides reviews of communication initiatives that have been implemented in the pilot. In addition, comments on the usability of the Online Energy Label system. Last in the document the recommendations for national roll-out of energy labeling of buildings, based on experiences from the pilot. (AG)

  6. YF-12A #935 with test pilot Donald L. Mallick

    Science.gov (United States)

    1972-01-01

    flights including the first using the three-axis side controller. In 1967, he was assigned to fly as one of two NASA pilots on the joint NASA-USAF XB-70 flight test program. Don flew as one of two NASA test pilots on the NASA YF-12A and YF-12C test programs accumulating 215 hours in 105 flights of test time in the triple-sonic Blackbirds. He was project pilot on both programs. Mallick was appointed Chief Pilot of the Flight Research Center in 1967, a position that he held for fourteen years. He was proud of the fact that during this period he flew himself and also directed six other NASA test pilots without a fatal accident. In 1981, he became Deputy Chief of the Aircraft Operations Division. Don retired April 3, 1987, after logging over 11,000 flight hours in more than 125 different types of aircraft and helicopters. Mallick has written several reports. In 1975, he was selected and honored as a Fellow in the Society of Experimental Test Pilots, of which he is still a member.

  7. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  8. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  9. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant (Mechanical fabrication)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper prepared plans of the mechanical equipment in the detailed design of a pilot plant in the joint research project on the environmental protection technology for highly efficient mineral resource extraction and treatment. (NEDO)

  10. Testing the HTA core model: experiences from two pilot projects

    DEFF Research Database (Denmark)

    Pasternack, Iris; Anttila, Heidi; Mäkelä, Marjukka

    2009-01-01

    OBJECTIVES: The aim of this study was to analyze and describe process and outcomes of two pilot assessments based on the HTA Core Model, discuss the applicability of the model, and explore areas of development. METHODS: Data were gathered from HTA Core Model and pilot Core HTA documents, their va...

  11. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  12. Stakeholder Engagement/Capacity Building Pilot Opportunity FAQ

    Science.gov (United States)

    Frequently Asked Questions (FAQs) about the pilot opportunity for stakeholder engagement/capacity building. EPA is offering an opportunity for community stakeholders and ports to participate in a pilot project to test and refine capacity building tools.

  13. An Evaluation of the British Red Cross’ Educational Pilot Project for Young People Serving Reparation Orders

    OpenAIRE

    Dresser, Paul; Irving, Adele; Soppitt, Sarah

    2015-01-01

    Using Newcastle Youth Offending Team (YOT) as a case-study, this report presents the findings of the evaluation of the British Red Cross (BRC) Educational Pilot Project (EPP) for service users serving reparation as part of Community Orders. The EPP was implemented between November 2011 and June 2012. However prior to this development, the BRC and Newcastle YOT had been working in partnership since 2005, to offer young people alternative forms of youth justice, focused around more physical tas...

  14. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  15. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  16. Radioactive waste disposal: Waste Isolation Pilot Plants (WIPP). March 1978-November 1989 (Citations from the NTIS data base). Report for Mar 78-Nov 89

    International Nuclear Information System (INIS)

    1990-01-01

    This bibliography contains citations concerning the Waste Isolation Pilot Plant (WIPP), a geologic repository located in New Mexico for transuranic wastes generated by the U.S. Government. Articles follow the development of the program from initial site selection and characterization through construction and testing, along with research programs on environmental impacts, structural design, and radionuclide landfill gases. Existing plants and facilities, pilot plants, migration, rock mechanics, economics, regulations, and transport of wastes to the site are also included. The Salt Repository Project and the Crystalline Repository Project are referenced in related published bibliographies. (Contains 184 citations fully indexed and including a title list.)

  17. Delivering a MOOC for literature searching in health libraries: evaluation of a pilot project.

    Science.gov (United States)

    Young, Gil; McLaren, Lisa; Maden, Michelle

    2017-12-01

    In an era when library budgets are being reduced, Massive Online Open Courses (MOOC's) can offer practical and viable alternatives to the delivery of costly face-to-face training courses. In this study, guest writers Gil Young from Health Care Libraries Unit - North, Lisa McLaren from Brighton and Sussex Medical School and Liverpool University PhD student Michelle Maden describe the outcomes of a funded project they led to develop a MOOC to deliver literature search training for health librarians. Funded by Health Education England, the MOOC was developed by the Library and Information Health Network North West as a pilot project that ran for six weeks. In particular, the MOOC target audience is discussed, how content was developed for the MOOC, promotion and participation, cost-effectiveness, evaluation, the impact of the MOOC and recommendations for future development. H. S. © 2017 Health Libraries Group.

  18. Performance evaluation of restaurant food waste and biowaste to biogas pilot projects in China and implications for national policy.

    Science.gov (United States)

    De Clercq, Djavan; Wen, Zongguo; Fan, Fei

    2017-03-15

    The objective of this research was to conduct a performance evaluation of three food waste/biowaste-to-biogas pilot projects across 7 scenarios in China based on multi-criteria decision analysis (MCDA) methodology. The projects ranked included a food waste-biogas project in Beijing, a food waste-biogas project in Suzhou and a co-digestion project producing biomethane in Hainan. The projects were ranked from best to worst based on technical, economic and environmental criteria under the MCDA framework. The results demonstrated that some projects are encountering operational problems. Based on these findings, six national policy recommendations were provided: (1) shift away from capital investment subsidies to performance-based subsidies; (2) re-design feed in tariffs; (3) promote bio-methane and project clustering; (4) improve collection efficiency by incentivizing FW producers to direct waste to biogas projects; (5) incentivize biogas projects to produce multiple outputs; (6) incentivize food waste-based projects to co-digest food waste with other substrates for higher gas output. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  20. Evaluation of a Pilot Project to Introduce Simulation-Based Team Training to Pediatric Surgery Trauma Room Care

    Directory of Open Access Journals (Sweden)

    Markus Lehner

    2017-01-01

    Full Text Available Introduction. Several studies in pediatric trauma care have demonstrated substantial deficits in both prehospital and emergency department management. Methods. In February 2015 the PAEDSIM collaborative conducted a one and a half day interdisciplinary, simulation based team-training course in a simulated pediatric emergency department. 14 physicians from the medical fields of pediatric surgery, pediatric intensive care and emergency medicine, and anesthesia participated, as well as four pediatric nurses. After a theoretical introduction and familiarization with the simulator, course attendees alternately participated in six simulation scenarios and debriefings. Each scenario incorporated elements of pediatric trauma management as well as Crew Resource Management (CRM educational objectives. Participants completed anonymous pre- and postcourse questionnaires and rated the course itself as well as their own medical qualification and knowledge of CRM. Results. Participants found the course very realistic and selected scenarios highly relevant to their daily work. They reported a feeling of improved medical and nontechnical skills as well as no uncomfortable feeling during scenarios or debriefings. Conclusion. To our knowledge this pilot-project represents the first successful implementation of a simulation-based team-training course focused on pediatric trauma care in German-speaking countries with good acceptance.

  1. Consumers’ behaviour and motives for selection of dairy beverages in Kvarner region: a pilot study

    OpenAIRE

    Krešić, Greta; Herceg, Zoran; Lelas, Vesna; Režek Jambrak, Anet

    2010-01-01

    Since food choice is always a unique and personal experience, consumer behaviour is important for food manufacturers and marketers in term of product success. Due to the beneficial healthprotective effects of dairy beverages, this market segment is very innovative and fast-growing. The aim of this pilot-study was to examine the consumption patterns, purchasing behaviour and motives for selection of dairy beverages. The sample of this study included 114 participants (44 males and 70 females...

  2. Consumers’ behaviour and motives for selection of dairy beverages in Kvarner region: a pilot study

    OpenAIRE

    Greta Krešić; Zoran Herceg; Vesna Lelas; Anet Režek Jambrak

    2010-01-01

    Since food choice is always a unique and personal experience, consumer behaviour is important for food manufacturers and marketers in term of product success. Due to the beneficial healthprotective effects of dairy beverages, this market segment is very innovative and fast-growing. The aim of this pilot-study was to examine the consumption patterns, purchasing behaviour and motivesfor selection of dairy beverages. The sample of this study included 114 participants (44 males and 70 females) wh...

  3. The last of NASA's original pilot astronauts expanding the space frontier in the late sixties

    CERN Document Server

    Shayler, David J

    2017-01-01

    Resulting from the authors’ deep research into these two pre-Shuttle astronaut groups, many intriguing and untold stories behind the selection process are revealed in the book. The often extraordinary backgrounds and personal ambitions of these skilled pilots, chosen to continue NASA’s exploration and knowledge of the space frontier, are also examined. In April 1966 NASA selected 19 pilot astronauts whose training was specifically targeted to the Apollo lunar landing missions and the Earth-orbiting Skylab space station. Three years later, following the sudden cancellation of the USAF’s highly classified Manned Orbiting Laboratory (MOL) project, seven military astronauts were also co-opted into NASA’s space program. This book represents the final chapter by the authors in the story of American astronaut selections prior to the era of the Space Shuttle. Through personal interviews and original NASA documentation, readers will also gain a true insight into a remarkable age of space travel as it unfolded ...

  4. Wind-To-Hydrogen Energy Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Ron Rebenitsch; Randall Bush; Allen Boushee; Brad G. Stevens; Kirk D. Williams; Jeremy Woeste; Ronda Peters; Keith Bennett

    2009-04-24

    WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the

  5. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  6. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  7. Preventing diarrhoea with household ceramic water filters: assessment of a pilot project in Bolivia.

    Science.gov (United States)

    Clasen, Thomas F; Brown, Joseph; Collin, Simon M

    2006-06-01

    In an attempt to prevent diarrhoea in a rural community in central Bolivia, an international non-governmental organization implemented a pilot project to improve drinking water quality using gravity-fed, household-based, ceramic water filters. We assessed the performance of the filters by conducting a five-month randomized controlled trial among all 60 households in the pilot community. Water filters eliminated thermotolerant (faecal) coliforms from almost all intervention households and significantly reduced turbidity, thereby improving water aesthetics. Most importantly, the filters were associated with a 45.3% reduction in prevalence of diarrhoea among the study population (p = 0.02). After adjustment for household clustering and repeated episodes in individuals and controlling for age and baseline diarrhoea, prevalence of diarrhoea among the intervention group was 51% lower than controls, though the protective effect was only borderline significant (OR 0.49, 95% CI: 0.24, 1.01; p = 0.05). A follow-up survey conducted approximately 9 months after deployment of the filters found 67% being used regularly, 13% being used intermittently, and 21% not in use. Water samples from all regularly used filters were free of thermotolerant coliforms.

  8. An interim report on the MCAT Essay Pilot Project.

    Science.gov (United States)

    Koenig, J A; Mitchell, K J

    1988-01-01

    Results from four pilot administrations of the Medical College Admission Test essay question are reported. Analyses focused on (a) the performance characteristics of sample groups differentiated by gender, size of hometown, race/ethnicity, and dominant language; (b) the relationships between essay scores and academic/demographic characteristics; and (c) the reliability of one 45-minute versus two 30-minute essays. No differences were found for examinees grouped by gender and size of home community. Mean differences among the racial/ethnic groups were explained largely by reading level differences. Differences in essay performance by language group were large and unexplained by reading level differences. No relationship was found between the essay score and the academic/demographic characteristics. Reliability estimates for two 30-minute essays were higher than for one 45-minute essay; however, the 30-minute period yielded writing of poorer quality. Test-retest reliabilities for the 45-minute topics will remain the focus of future studies as will performance by examinees for whom English is a second language. The impact of the essay on the selection process will also be assessed.

  9. Pre-Study Walkthrough with a Commercial Pilot for a Preliminary Single Pilot Operations Experiment

    Science.gov (United States)

    O'Connor-Dreher, Ryan; Roberts, Z.; Ziccardi, J.; Vu, K-P. L.; Strybel, T.; Koteskey, Robert William; Lachter, Joel B.; Vi Dao, Quang; Johnson, Walter W.; Battiste, V.

    2013-01-01

    The number of crew members in commercial flights has decreased to two members, down from the five-member crew required 50 years ago. One question of interest is whether the crew should be reduced to one pilot. In order to determine the critical factors involved in safely transitioning to a single pilot, research must examine whether any performance deficits arise with the loss of a crew member. With a concrete understanding of the cognitive and behavioral role of a co-pilot, aeronautical technologies and procedures can be developed that make up for the removal of the second aircrew member. The current project describes a pre-study walkthrough process that can be used to help in the development of scenarios for testing future concepts and technologies for single pilot operations. Qualitative information regarding the tasks performed by the pilots can be extracted with this technique and adapted for future investigations of single pilot operations.

  10. Industrial heat pumps for high temperatures - a pilot project; Industrielle varmepumper for hoeje temperaturer - et forprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M. [Dansk Energi Analyse A/S, Frederiksberg (Denmark); Weel, M.; Mikkelsen, J. [Weel and Sandvig, Kgs. Lyngby (Denmark)

    2012-03-15

    This project investigates the possibility of using mass produced and inexpensive turbo compressor technology for heat pumping in the industry. The compressors are designed for the compression of air and used by the automotive industry in connection with turbo-chargers. The heat pumps are primarily intended to use water as the working medium, which in addition to having no environmental loads, is suitable for the heat pumping at temperatures above about 60 deg. C and up to about 200 deg. C, a temperature level which is considerably higher than what has previously been observed covered with heat pumping. In this project, a Danish-produced high-speed gear (Rotrex) is used, which has just been developed to said compressor technology. In cooperation with Rotrex, the modifications relevant to a standard unit were analyzed and assessed. The project identified some areas of industry where heat pumping using this technology is considered to be attractive. A pilot plant operating with steam in a total of 12 hours is demonstrated. In more than 3 hours, the pilot plant was coupled so that it delivered useful heat supply to the evaporator. The plant has during the tests worked satisfactorily, and there is no evidence of problems with leaks in the compressor shaft sealings, neither in relation to the leakage of oil or steam, which was one of the central issues to clarify with the demonstration. In the limited testing period no problems were detected that could not be immediately resolved, i.e. the transmission in the form of a belt drive with high speed from the engine to the friction gear. In the determination of the performance of the compressor during the trial operation with steam as a working medium, it is shown that the conversion efficiency are within the expected range when taking into account the uncertainties in the measurements and the calculation method. In the experiment, no measurement of steam flow through the compressor was made, because of a greatly reduced

  11. PERSPECTIVE: REDD pilot project scenarios: are costs and benefits altered by spatial scale?

    Science.gov (United States)

    Carlson, Kimberly M.; Curran, Lisa M.

    2009-09-01

    Kimberly M Carlson Payments for reducing carbon emissions due to deforestation and degradation (REDD) have garnered considerable global interest and investments. These financial incentives aim to alter the drivers of land use change by reducing opportunity costs of retaining forest cover, and are often promoted as multipartite solutions that not only generate profits and reduce carbon emissions but provide benefits for human development and biodiversity. Currently, the United Nations Framework Convention on Climate Change (UNFCCC) is debating a post-Kyoto protocol with national or sub-national emission reduction targets. Anticipating the inclusion of REDD in this agreement, >80% of pilot REDD projects are being established in tropical regions (table 1). While the capacity of REDD projects to meet their stated objectives must be assessed post- implementation, land use change models are powerful tools for generating potential outcomes from these pilot initiatives. Table 1. Extent and emissions reductions for all REDD projects as reported by Ecosystem Marketplace, which maintains a comprehensive and up-to-date inventory of REDD projects that are selling credits and/or are verified by a third-party verifier. Adapted from Forest Carbon Portal (2009). Geographical zoneContinentProjects (#) Area (km2) Emissions reductions (Mt C) Tropical and Subtropical Africa2775019.50 Asia28100109.60 South America 9183 880278.24 TemperateAustralia1140.18 North America115N/A Totals15199 759407.52 In this issue of ERL, Gaveau et al (2009) use a spatially-explicit model to explore the potential of a REDD pilot project in northern Sumatra, Indonesia, to reduce deforestation and conserve orangutan biodiversity. This project is conceived by the Provincial Government of Aceh, financed by Merrill Lynch, and co-managed by carbon trading firm Carbon Conservation and NGO Flora and Fauna International. Project managers estimate CO2 emissions reductions at 3.4 Mt y-1 over 30 years across a 7500 km2

  12. Cosmic radiation and airline pilots. Exposure patterns of Norwegian SAS-pilots 1960 to 1994

    International Nuclear Information System (INIS)

    Tveten, U.

    1997-02-01

    The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institutt for Energiteknikk (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). The project has been partially financed by the Norwegian Research Council. Originating from the Norwegian project, a number of similar projects have been started or are in the planning stage in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots employed by the Scandinavian Airline System (SAS). The results presented in this report (radiation doserates for the different types of aircraft in the different years) will, in a later stage of the project, be utilized to estimate the individual radiation exposure histories. The major sources of information used as basis for this work is the collection of old SAS time tables found in the SAS Museum at Fornebu Airport in Oslo, and information provided by members of the Pilots Associations

  13. Cosmic radiation and airline pilots. Exposure patterns of Norwegian SAS-pilots 1960 to 1994

    Energy Technology Data Exchange (ETDEWEB)

    Tveten, U.

    1997-02-01

    The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institutt for Energiteknikk (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). The project has been partially financed by the Norwegian Research Council. Originating from the Norwegian project, a number of similar projects have been started or are in the planning stage in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots employed by the Scandinavian Airline System (SAS). The results presented in this report (radiation doserates for the different types of aircraft in the different years) will, in a later stage of the project, be utilized to estimate the individual radiation exposure histories. The major sources of information used as basis for this work is the collection of old SAS time tables found in the SAS Museum at Fornebu Airport in Oslo, and information provided by members of the Pilots Associations.

  14. Recent developments in the Los Alamos National Laboratory Plutonium Facility Waste Tracking System-automated data collection pilot project

    International Nuclear Information System (INIS)

    Martinez, B.; Montoya, A.; Klein, W.

    1999-01-01

    The waste management and environmental compliance group (NMT-7) at the Los Alamos National Laboratory has initiated a pilot project for demonstrating the feasibility and utility of automated data collection as a solution for tracking waste containers at the Los Alamos National Laboratory Plutonium Facility. This project, the Los Alamos Waste Tracking System (LAWTS), tracks waste containers during their lifecycle at the facility. LAWTS is a two-tiered system consisting of a server/workstation database and reporting engine and a hand-held data terminal-based client program for collecting data directly from tracked containers. New containers may be added to the system from either the client unit or from the server database. Once containers are in the system, they can be tracked through one of three primary transactions: Move, Inventory, and Shipment. Because LAWTS is a pilot project, it also serves as a learning experience for all parties involved. This paper will discuss many of the lessons learned in implementing a data collection system in the restricted environment. Specifically, the authors will discuss issues related to working with the PPT 4640 terminal system as the data collection unit. They will discuss problems with form factor (size, usability, etc.) as well as technical problems with wireless radio frequency functions. They will also discuss complications that arose from outdoor use of the terminal (barcode scanning failures, screen readability problems). The paper will conclude with a series of recommendations for proceeding with LAWTS based on experience to date

  15. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    International Nuclear Information System (INIS)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-01-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL's Program is utilizing nearly all areas in PMI's Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?'' and ''How are you approaching similar challenges?'' will be questions for a dialog with the audience

  16. Rate of information processing and reaction time of aircraft pilots and non-pilots

    Directory of Open Access Journals (Sweden)

    Werner Barkhuizen

    2002-09-01

    Full Text Available Reaction time and rate of information processing are cited as critical components in the make-up of pilots. A need was identified to establish the validity of various chronometric measures in the selection of pilots. Fifty-eight military and commercial pilots and twenty non-pilots were subjected to Schepers’ Computerised Information Processing Test Battery, which measures reaction time, form discrimination time, colour discrimination time, rate of information processing (perceptual and rate of information processing (conceptual. Five hypotheses and one postulate were formulated and tested. The results indicate that pilots could be differentiated from non-pilots with 92,3% accuracy. However, the results need to be cross-validated before they are used for selection. Opsomming Reaksietyd en tempo van inligtingverwerking word as kritieke komponente in die samestelling van vlieëniers beskou. ‘n Behoefte is geïdentifiseer om die geldigheid van verskeie chronometriese metinge in vlieënierskeuring te bepaal. Agt en vyftig militêre en kommersiële vlieëniers en twintig nie-vlieëniers is onderwerp aan Schepers se Gerekenariseerde Inligtingverwerkingstoets-battery wat reaksietyd, vormdiskriminasietyd, kleurdiskriminasietyd, tempo van inligtingverwerking (perseptueel en tempo van inligtingverwerking (konseptueel meet. Vyf hipoteses en een postulaat is gestel en getoets. Die resultate dui daarop dat vlieëniers met 92,3% akkuraatheid van nievlieëniers onderskei kan word. Die resultate behoort egter eers gekruisvalideer te word voordat dit finaal vir keuring gebruik kan word.

  17. Airspace Technology Demonstration 2 (ATD-2): ATD-2 CLT Pilot Community Engagement

    Science.gov (United States)

    Capps, Al; Hooey, Becky

    2017-01-01

    The Airspace Technology Demonstration 2 (ATD-2) project conducted a pilot community workshop at Charlotte Douglas International Airport (CLT) in Charlotte, North Carolina. The goal was to familiarize pilots with the ATD-2 project, with an emphasis on procedures that may affect pilots during the Phase 1 Field Demonstration (beginning September 30, 2017). At this workshop, the high-level goals and objectives of ATD-2, expected benefits for pilots, changes to procedures, training requirements, and data sharing elements were presented.

  18. A framework for considering climate change in transportation and land use scenario planning : lessons learned from an interagency pilot project on Cape Cod.

    Science.gov (United States)

    2011-07-01

    The Interagency Transportation, Land Use, and Climate Change Pilot Project utilized a scenario planning process to develop a multi-agency transportation- and land use-focused development strategy for Cape Cod, Massachusetts, with the intention of ach...

  19. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  20. Live Piloting and Prototyping

    Directory of Open Access Journals (Sweden)

    Francesca Rizzo

    2013-07-01

    Full Text Available This paper presents current trends in service design research concerning large scale projects aimed at generating changes at a local scale. The strategy adopted to achieve this, is to co-design solutions including future users in the development process, prototyping and testing system of products and services before their actual implementation. On the basis of experience achieved in the European Project Life 2.0, this paper discusses which methods and competencies are applied in the development of these projects, eliciting the lessons learnt especially from the piloting phase in which the participatory design (PD approach plays a major role. In the first part, the topic is introduced jointly with the theoretical background where the user center design and participatory design methods are presented; then the Life 2.0 project development is described; finally the experience is discussed from a service design perspective, eliciting guidelines for piloting and prototyping services in a real context of use. The paper concludes reflecting on the designers’ role and competencies needed in this process.

  1. Pilot project concerning the establishment of a collective biomass conversion plant on the island of Mors

    International Nuclear Information System (INIS)

    1993-06-01

    This pilot project comprises a feasibility study in connection with plans to establish a biomass conversion plant, on the Danish island of Mors, which would provide methane to be used as fuel, in combination with natural gas, for a cogeneration plant serving six villages. The subjects of location, organization, the transportation of biomass, the design of the biomass conversion plant, economical aspects and conditions of the use of the methane are discussed as a basis for decisions in this respect. Environmental considerations are also dealt with. (AB)

  2. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  3. Teaching weather and climate science in primary schools - a pilot project from the UK Met Office

    Science.gov (United States)

    Orrell, Richard; Liggins, Felicity; Challenger, Lesley; Lethem, Dom; Campbell, Katy

    2017-04-01

    Wow Schools is a pilot project from the Met Office with an aim to inspire and educate the next generation of scientists and, uniquely, use the data collected by schools to improve weather forecasts and warnings across the UK. Wow Schools was launched in late 2015 with a competition open to primary schools across the UK. 74 schools entered the draw, all hoping to be picked as one of the ten lucky schools taking part in the pilot scheme. Each winning school received a fully automatic weather station (AWS), enabling them to transmit real-time local weather observations to the Met Office's Weather Observation Website (WOW - wow.metoffice.gov.uk), an award winning web portal for uploading and sharing a range of environmental observations. They were also given a package of materials designed to get students out of the classroom to observe the weather, get hands-on with the science underpinning weather forecasting, and analyse the data they are collecting. The curriculum-relevant materials were designed with the age group 7 to 11 in mind, but could be extended to support other age groups. Each school was offered a visit by a Wow Schools Ambassador (a Met Office employee) to bring the students' learning to life, and access to a dedicated forecast for its location generated by our new supercomputer. These forecasts are improved by the school's onsite AWS reinforcing the link between observations and forecast production. The Wow Schools pilot ran throughout 2016. Here, we present the initial findings of the project, examining the potential benefits and challenges of working with schools across the UK to: enrich students' understanding of the science of weather forecasting; to source an ongoing supply of weather observations and discover how these might be used in the forecasting process; and explore what materials and business model(s) would be most useful and affordable if a wider roll-out of the initiative was undertaken.

  4. Value pricing pilot program : lessons learned

    Science.gov (United States)

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  5. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  6. APMP Pilot Study on Transmittance Haze

    Science.gov (United States)

    Liu, Wen-Chun; Hwang, Jisoo; Koo, Annette; Wu, Houping; Leecharoen, Rojana; Yu, Hsueh-Ling

    2018-02-01

    Five NMIs within APMP, including CMS/ITRI, MSL, NIM, NIMT and KRISS from TCPR applied to the APMP technical committee initiative project for funding to carry out a pilot comparison of transmittance haze in 2012. The project started in 2014 and the final report was completed at the end of 2016. In this pilot comparison, three different haze standards were adopted, and transmittance haze for each standard was measured according to ASTM D1003 or ISO 14782. This paper presents the first results of an APMP pilot study of transmittance haze and the analysis of the variation among different haze measurement systems which are commonly used. The study shows that the variables such as sphere multiplier, transmittance distribution, fluorescence of samples and optical path of the incident beam cause discrepancies among NMIs and highlight deficiencies in current documentary standards.

  7. Soil-biological, soil-chemical and soil-physical parameters along a pollutant gradient on grassland sites in the vicinity o Brixlegg (Tyrol) - a pilot project

    International Nuclear Information System (INIS)

    Pohla, H.; Palzenberger, M.; Krassnigg, F.; Kandeler, E.; Schwarz, S.; Kasperowski, E.

    1992-01-01

    It was the main aim of this pilot project to check the indicator value of soil organisms by means of distinct pollutant gradients - heavy metals, organic compounds (PCB, dioxins) -. On the basis of available results (1/2/3/), 4 grassland sites at increasing distances from a local emission source (copper production from scrap metal) were selected. Physical and chemical analyses as well as the quantification of habitat structures were used for the characterization of the sites. The following analyses were carried out accompanyingly: The performances of soil microorganisms under pollutant load, the accumulation of pollutants, and the structures of plants and animal communities (macro, meso and microfauna). The investigation area and the examined parameters are introduced, as well as first result on soil chemistry and enzymatics as well as for the accumulation of heavy metals in an earthworm species are introduced. (orig.) [de

  8. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Photographs and drawings were edited into a book in relation with a joint project for environment preservation technologies in high-efficiency extraction and treatment of mineral resources, and detail design for a pilot plant. The book classified the related devices into fabricated devices, purchased devices and electrical devices, and contains detailed drawings and photographs thereof. (NEDO)

  9. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  10. A coordinated school health approach to obesity prevention among Appalachian youth: the Winning with Wellness Pilot Project.

    Science.gov (United States)

    Schetzina, Karen E; Dalton, William T; Lowe, Elizabeth F; Azzazy, Nora; VonWerssowetz, Katrina M; Givens, Connie; Pfortmiller, Deborah T; Stern, H Patrick

    2009-01-01

    Childhood obesity has been an increasing problem in the United States, especially in rural areas. Effective prevention approaches are needed. This article describes the development, implementation, effectiveness, feasibility, and sustainability of a school-based obesity prevention pilot project, Winning with Wellness. The program was based on the coordinated school health model and included a community-based participatory research approach aimed at promoting healthy eating and physical activity in a rural Appalachian elementary school. Findings from this preliminary project revealed improvements in nutrition offerings and increased physical activity during the school day. In addition, the program was found to be acceptable to teachers, successfully implemented utilizing both existing and newly developed resources, and sustainable as evidenced in continued practice and expansion to other area schools.

  11. The HADES demonstration and pilot project on radioactive waste disposal in a clay formation

    International Nuclear Information System (INIS)

    Bonne, A.; Beckers, H.; Beaufays, R.; Buyens, M.; Coursier, J.; Bruyn, D. de; Fonteyne, A.; Genicot, J.; Lamy, D.; Meynendonckx, P.; Monsecour, M.; Neerdael, B.; Noynaert, L.; Voet, M.; Volekaert, G.

    1992-01-01

    The overall objective of the HADES programme is the evaluation of the technical feasibility and safety of the disposal of radwaste in a deep clay formation. The pilot phase is aimed at demonstrating the system behaviour for those components of the system and those operations and issues which can be demonstrated directly. The time period considered covers a first phase of the development programme of the pilot project which includes: -The construction of a concrete lined tests drift of about 30 m length with a useful inner diameter of 3.5 m. In the lining, a number of openings or ports are foreseen for emplacing the various tests and sensors for the general auscultation in the host rock; - Mine-by test for the investigation of the response of the surrounding clay on the excavating; - CERBERUS test, a combined heating-irradiation test aiming at evaluating by simulation (electrical heaters and Co-60 radiation source) the impact of a HLW canister on its immediate near field; - Design of a gallery heating test for the demonstration by simulation of the behaviour of a concrete lined gallery structure and of the surrounding clay mass in a temperature field (TEMPPRES code for temperature and pressure evolution simulation). 21 refs

  12. STEM Pilot Project Grant Program: Report to the Legislature, June 2016

    Science.gov (United States)

    Noahr, Lorrell; Black, Scott; Rogers, Justin

    2016-01-01

    The Washington State Legislature established the Science, Technology, Engineering, & Math (STEM) Pilot Program in the 2015-2017 capital budget (Chapter 3, Laws of 2015, 3rd Sp. Session, Section 5026) and provided $12,500,000 for this pilot grant program. Grants awarded under this program constitute the districts' local funding for purposes of…

  13. Assistive Solutions in Practice: Experiences from AAL Pilot Regions in Austria.

    Science.gov (United States)

    Ates, Nesrin; Aumayr, Georg; Drobics, Mario; Förster, Kristina Maria; Frauenberger, Christopher; Garschall, Markus; Kofler, Manfred; Krainer, Daniela; Kropf, Johannes; Majcen, Kurt; Oberzaucher, Johannes; Piazolo, Felix; Rzepka, Angelika; Sauskojus, Julia; Schneider, Cornelia; Stainer-Hochgatterer, Andreas; Sturm, Nadine; Waibel, Uli; Willner, Viktoria

    2017-01-01

    Since 2012 six AAL pilot regions were launched in Austria. The main goal of these pilot regions is to evaluate the impact of AAL technologies in daily use considering the entire value chain. Additionally, go-to market strategies for assistive technologies based on an involvement of all relevant stakeholders are developed. Within this paper an overview of the specific objectives, approaches and the status of all Austrian AAL pilot regions is given. Taking into account the different experiences of the different pilot regions, specific challenges in establishing, implementing and sustaining pilot region projects are discussed and lessons-learned are presented. Results show that a careful planning of all project phases taking into account available resources is crucial for the successful implementation of an AAL pilot region. In particular, this applies to all activities related to the active involvement of end-users.

  14. Remediation of contaminated areas in the aftermath of the accident at the Fukushima Daiichi Nuclear Power Station. Overview, analysis and lessons learned. Part 1. A report on the ''decontamination pilot project''

    International Nuclear Information System (INIS)

    Nakayama, Shinichi; Kawase, Keiichi; Iijima, Kazuki; Miyahara, Kaname; Hardie, Susan; McKinley, Ian; Klein, Liza; Yashio, Shoko

    2015-03-01

    In the wake of the Great Tohoku earthquake and tsunami, which resulted in significant damage to the Fukushima Daiichi nuclear power station, considerable radioactive discharge and deposition occurred. Populations were evacuated from the zones that received the most deposition and overarching 'Special Measures' laws established the Ministry of the Environment (MOE) as the department responsible for decontamination to remediate the environment. Major challenges to implementing full-scale environmental decontamination were the absence of real-world examples and also lack of experience in planning and implementing decontamination technology appropriate to the physical and social boundary conditions in both Japan and Fukushima. The Japan Atomic Energy Agency (JAEA) was thus charged with conducting a range of 'Decontamination Pilot Project' to examine the applicability of decontamination technologies, with a special focus on reducing dose rates and thus allowing evacuees to return to re-establish their normal lifestyles as quickly as possible, whilst simultaneously maintaining worker safety. The Decontamination Pilot Project was implemented at 16 sites in 11 municipalities within the evacuated zone, including locations that received the highest deposition. Despite tight boundary conditions in terms of timescale and resources, the Decontamination Pilot Project provides a good basis for developing recommendations on how to assure decontamination efficiency and worker safety whilst additionally constraining costs, subsequent waste management and environmental impacts. The Decontamination Pilot Project has thus played a key role in the drafting of guidelines and manuals that are currently being used as a source of reference by the national government, local municipalities and the contractors performing regional decontamination. Part 1 of this report summarises the Decontamination Pilot Project, providing the background required to put this work in context for an

  15. Strategizing Carbon-Neutral Mines: A Case for Pilot Projects

    Directory of Open Access Journals (Sweden)

    Ian M. Power

    2014-05-01

    Full Text Available Ultramafic and mafic mine tailings are a valuable feedstock for carbon mineralization that should be used to offset carbon emissions generated by the mining industry. Although passive carbonation is occurring at the abandoned Clinton Creek asbestos mine, and the active Diavik diamond and Mount Keith nickel mines, there remains untapped potential for sequestering CO2 within these mine wastes. There is the potential to accelerate carbonation to create economically viable, large-scale CO2 fixation technologies that can operate at near-surface temperature and atmospheric pressure. We review several relevant acceleration strategies including: bioleaching of magnesium silicates; increasing the supply of CO2 via heterotrophic oxidation of waste organics; and biologically induced carbonate precipitation, as well as enhancing passive carbonation through tailings management practices and use of CO2 point sources. Scenarios for pilot scale projects are proposed with the aim of moving towards carbon-neutral mines. A financial incentive is necessary to encourage the development of these strategies. We recommend the use of a dynamic real options pricing approach, instead of traditional discounted cash-flow approaches, because it reflects the inherent value in managerial flexibility to adapt and capitalize on favorable future opportunities in the highly volatile carbon market.

  16. The Establishment of the Colombian Integrated Program for Antimicrobial Resistance Surveillance (COIPARS): A Pilot Project on Poultry Farms, Slaughterhouses and Retail Market.

    Science.gov (United States)

    Donado-Godoy, P; Castellanos, R; León, M; Arevalo, A; Clavijo, V; Bernal, J; León, D; Tafur, M A; Byrne, B A; Smith, W A; Perez-Gutierrez, E

    2015-04-01

    The development of antimicrobial resistance among bacteria (AMR) is currently one of the world's most pressing public health problems. The use of antimicrobial agents in humans and animals has resulted in AMR which has narrowed the potential use of antibiotics for the treatment of infections in humans. To monitor AMR and to develop control measures, some countries, such as the USA, Canada and Denmark, have established national integrated surveillance systems (FDA, , CIPARS, 2007, DANMAP,2002). The components of these programs monitor changes in susceptibility/resistance to antimicrobial agents of selected zoonotic pathogens and commensal organisms recovered from animals, retail meats and humans. The rapid development of Colombia's animal production industry has raised food safety issues including the emergence of antibiotic resistance. The Colombian Integrated Surveillance Program for Antimicrobial Resistance (COIPARS) was established as a pilot project to monitor AMR on poultry farms, slaughter houses and retail markets. © 2015 Blackwell Verlag GmbH.

  17. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-07-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

  18. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  19. Development of CO2 Selective Poly(Ethylene Oxide-Based Membranes: From Laboratory to Pilot Plant Scale

    Directory of Open Access Journals (Sweden)

    Torsten Brinkmann

    2017-08-01

    Full Text Available Membrane gas separation is one of the most promising technologies for the separation of carbon dioxide (CO2 from various gas streams. One application of this technology is the treatment of flue gases from combustion processes for the purpose of carbon capture and storage. For this application, poly(ethylene oxide-containing block copolymers such as Pebax® or PolyActive™ polymer are well suited. The thin-film composite membrane that is considered in this overview employs PolyActive™ polymer as a selective layer material. The membrane shows excellent CO2 permeances of up to 4 m3(STP·(m2·h·bar−1 (1 bar = 105 Pa at a carbon dioxide/nitrogen (CO2/N2 selectivity exceeding 55 at ambient temperature. The membrane can be manufactured reproducibly on a pilot scale and mounted into flat-sheet membrane modules of different designs. The operating performance of these modules can be accurately predicted by specifically developed simulation tools, which employ single-gas permeation data as the only experimental input. The performance of membranes and modules was investigated in different pilot plant studies, in which flue gas and biogas were used as the feed gas streams. The investigated processes showed a stable separation performance, indicating the applicability of PolyActive™ polymer as a membrane material for industrial-scale gas processing.

  20. Optimization of the recovery factor by implementing a continuous steam injection pilot in the Huyapari Field located in the Orinoco oil belt. Venezuela

    Energy Technology Data Exchange (ETDEWEB)

    Li, L.; Munckton, T.; Armas, F.; Johan, J.; Barrios, A. [PDVSA PetroPiar (Venezuela)

    2011-07-01

    Located in Venezuela, the Orinoco heavy oil belt (Faja) is one of the world's biggest accumulations of extra heavy crude oil. Recovery rates in the Faja are relatively low and so one of the key objectives is to increase it. The thermal recovery process could be a way to increase production as it has been proven in other heavy oil fields and PDVSA has started a pilot project to test the process on the Faja reservoirs. This paper aimed at providing an overview of the project. The different steps of the Huyapari thermal pilot project are discussed: the objectives and challenges of the project, project design, uncertainty management, site selection, modeling of the site subsurface and optimization planning in terms of well configuration and constraints. This project is under development and further steps will be required before there are results but when there are, it is expected that they will provide valuable information on the technical and economic feasibility of thermal recovery projects in the Faja area.

  1. An Index to Measure Sustainability of a Business Project in the Construction Industry: Lithuanian Case

    Directory of Open Access Journals (Sweden)

    Nomeda Dobrovolskienė

    2015-12-01

    Full Text Available The continuous growth of the world population, resource scarcity and the threat of climate change pose numerous environmental and social problems to the world. Therefore, much hope is put in the concept of sustainability. Companies are increasingly coming under strong global pressure to incorporate sustainability considerations into their project decision-making process. Business projects in the construction industry are among the most important, as this sector is one of the largest sectors and of major importance for the national economy and therefore has a huge impact on the environment and society. Thus, we have to explore ways to integrate sustainability into the management of those projects. This paper presents a composite sustainability index of a project (CSIP which has been created following a review of existing literature and a pilot research study. A pilot research study was conducted in the Lithuanian construction industry between January 2015 and June 2015. Sustainability criteria were chosen and grouped on the basis of the analysis of the literature and different standards relating to sustainability applicable in the construction industry. A survey was used to select and rank the most important sustainability criteria. The index was constructed using multi-criteria decision-making methods. The results of the pilot study revealed that practitioners in the Lithuanian construction sector attach most importance to 15 sustainability criteria. A composite sustainability index of a project combining all these criteria may be useful in assessing the sustainability of a business project and making decisions regarding project portfolio selection and financial resource allocation. When addressing the issue of financial resource allocation in a project portfolio, the decision-maker could take into account not only the project’s return and risk, but also its sustainability. The understanding of this study should enable companies to execute

  2. Ground-water quality assessment of the central Oklahoma Aquifer, Oklahoma; project description

    Science.gov (United States)

    Christenson, S.C.; Parkhurst, D.L.

    1987-01-01

    In April 1986, the U.S. Geological Survey began a pilot program to assess the quality of the Nation's surface-water and ground-water resources. The program, known as the National Water-Quality Assessment (NAWQA) program, is designed to acquire and interpret information about a variety of water-quality issues. The Central Oklahoma aquifer project is one of three ground-water pilot projects that have been started. The NAWQA program also incudes four surface-water pilot projects. The Central Oklahoma aquifer project, as part of the pilot NAWQA program, will develop and test methods for performing assessments of ground-water quality. The objectives of the Central Oklahoma aquifer assessment are: (1) To investigate regional ground-water quality throughout the aquifer in the manner consistent with the other pilot ground-water projects, emphasizing the occurrence and distribution of potentially toxic substances in ground water, including trace elements, organic compounds, and radioactive constituents; (2) to describe relations between ground-water quality, land use, hydrogeology, and other pertinent factors; and (3) to provide a general description of the location, nature, and possible causes of selected prevalent water-quality problems within the study unit; and (4) to describe the potential for water-quality degradation of ground-water zones within the study unit. The Central Oklahoma aquifer, which includes in descending order the Garber Sandstone and Wellington Formation, the Chase Group, the Council Grove Group, the Admire Group, and overlying alluvium and terrace deposits, underlies about 3,000 square miles of central Oklahoma and is used extensively for municipal, industrial, commercial, and domestic water supplies. The aquifer was selected for study by the NAWQA program because it is a major source for water supplies in central Oklahoma and because it has several known or suspected water-quality problems. Known problems include concentrations of arsenic, chromium

  3. Workplace-based assessment of communication skills: A pilot project addressing feasibility, acceptance and reliability

    Science.gov (United States)

    Weyers, Simone; Jemi, Iman; Karger, André; Raski, Bianca; Rotthoff, Thomas; Pentzek, Michael; Mortsiefer, Achim

    2016-01-01

    Background: Imparting communication skills has been given great importance in medical curricula. In addition to standardized assessments, students should communicate with real patients in actual clinical situations during workplace-based assessments and receive structured feedback on their performance. The aim of this project was to pilot a formative testing method for workplace-based assessment. Our investigation centered in particular on whether or not physicians view the method as feasible and how high acceptance is among students. In addition, we assessed the reliability of the method. Method: As part of the project, 16 students held two consultations each with chronically ill patients at the medical practice where they were completing GP training. These consultations were video-recorded. The trained mentoring physician rated the student’s performance and provided feedback immediately following the consultations using the Berlin Global Rating scale (BGR). Two impartial, trained raters also evaluated the videos using BGR. For qualitative and quantitative analysis, information on how physicians and students viewed feasibility and their levels of acceptance was collected in written form in a partially standardized manner. To test for reliability, the test-retest reliability was calculated for both of the overall evaluations given by each rater. The inter-rater reliability was determined for the three evaluations of each individual consultation. Results: The formative assessment method was rated positively by both physicians and students. It is relatively easy to integrate into daily routines. Its significant value lies in the personal, structured and recurring feedback. The two overall scores for each patient consultation given by the two impartial raters correlate moderately. The degree of uniformity among the three raters in respect to the individual consultations is low. Discussion: Within the scope of this pilot project, only a small sample of physicians and

  4. Workplace-based assessment of communication skills: A pilot project addressing feasibility, acceptance and reliability

    Directory of Open Access Journals (Sweden)

    Weyers, Simone

    2016-11-01

    Full Text Available Background: Imparting communication skills has been given great importance in medical curricula. In addition to standardized assessments, students should communicate with real patients in actual clinical situations during workplace-based assessments and receive structured feedback on their performance. The aim of this project was to pilot a formative testing method for workplace-based assessment. Our investigation centered in particular on whether or not physicians view the method as feasible and how high acceptance is among students. In addition, we assessed the reliability of the method.Method: As part of the project, 16 students held two consultations each with chronically ill patients at the medical practice where they were completing GP training. These consultations were video-recorded. The trained mentoring physician rated the student’s performance and provided feedback immediately following the consultations using the Berlin Global Rating scale (BGR. Two impartial, trained raters also evaluated the videos using BGR. For qualitative and quantitative analysis, information on how physicians and students viewed feasibility and their levels of acceptance was collected in written form in a partially standardized manner. To test for reliability, the test-retest reliability was calculated for both of the overall evaluations given by each rater. The inter-rater reliability was determined for the three evaluations of each individual consultation.Results: The formative assessment method was rated positively by both physicians and students. It is relatively easy to integrate into daily routines. Its significant value lies in the personal, structured and recurring feedback. The two overall scores for each patient consultation given by the two impartial raters correlate moderately. The degree of uniformity among the three raters in respect to the individual consultations is low.Discussion: Within the scope of this pilot project, only a small sample

  5. Workplace-based assessment of communication skills: A pilot project addressing feasibility, acceptance and reliability.

    Science.gov (United States)

    Weyers, Simone; Jemi, Iman; Karger, André; Raski, Bianca; Rotthoff, Thomas; Pentzek, Michael; Mortsiefer, Achim

    2016-01-01

    Background: Imparting communication skills has been given great importance in medical curricula. In addition to standardized assessments, students should communicate with real patients in actual clinical situations during workplace-based assessments and receive structured feedback on their performance. The aim of this project was to pilot a formative testing method for workplace-based assessment. Our investigation centered in particular on whether or not physicians view the method as feasible and how high acceptance is among students. In addition, we assessed the reliability of the method. Method: As part of the project, 16 students held two consultations each with chronically ill patients at the medical practice where they were completing GP training. These consultations were video-recorded. The trained mentoring physician rated the student's performance and provided feedback immediately following the consultations using the Berlin Global Rating scale (BGR). Two impartial, trained raters also evaluated the videos using BGR. For qualitative and quantitative analysis, information on how physicians and students viewed feasibility and their levels of acceptance was collected in written form in a partially standardized manner. To test for reliability, the test-retest reliability was calculated for both of the overall evaluations given by each rater. The inter-rater reliability was determined for the three evaluations of each individual consultation. Results: The formative assessment method was rated positively by both physicians and students. It is relatively easy to integrate into daily routines. Its significant value lies in the personal, structured and recurring feedback. The two overall scores for each patient consultation given by the two impartial raters correlate moderately. The degree of uniformity among the three raters in respect to the individual consultations is low. Discussion: Within the scope of this pilot project, only a small sample of physicians and

  6. FY2017 Pilot Project Plan for the Nuclear Energy Knowledge and Validation Center Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Ren, Weiju [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-10-30

    To prepare for technical development of computational code validation under the Nuclear Energy Knowledge and Validation Center (NEKVAC) initiative, several meetings were held by a group of experts of the Idaho National Laboratory (INL) and the Oak Ridge National Laboratory (ORNL) to develop requirements of, and formulate a structure for, a transient fuel database through leveraging existing resources. It was concluded in discussions of these meetings that a pilot project is needed to address the most fundamental issues that can generate immediate stimulus to near-future validation developments as well as long-lasting benefits to NEKVAC operation. The present project is proposed based on the consensus of these discussions. Analysis of common scenarios in code validation indicates that the incapability of acquiring satisfactory validation data is often a showstopper that must first be tackled before any confident validation developments can be carried out. Validation data are usually found scattered in different places most likely with interrelationships among the data not well documented, incomplete with information for some parameters missing, nonexistent, or unrealistic to experimentally generate. Furthermore, with very different technical backgrounds, the modeler, the experimentalist, and the knowledgebase developer that must be involved in validation data development often cannot communicate effectively without a data package template that is representative of the data structure for the information domain of interest to the desired code validation. This pilot project is proposed to use the legendary TREAT Experiments Database to provide core elements for creating an ideal validation data package. Data gaps and missing data interrelationships will be identified from these core elements. All the identified missing elements will then be filled in with experimental data if available from other existing sources or with dummy data if nonexistent. The resulting hybrid

  7. NEREDA Pilot Studies 2003 - 2010; NEREDA Pilotonderzoeken 2003 - 2010

    Energy Technology Data Exchange (ETDEWEB)

    Berkhof, D.; De Bruin, B.; Kerstholt, M.; Kraan, R.; Miska, V.; Peeters, T.; Van der Roest, H.; Verschoor, J. [DHV, Amersfoort (Netherlands); De Kreuk, M.; Van Loosdrecht, M. [Technische Universiteit Delft TUD, Delft (Netherlands)

    2010-10-15

    Since the nineties of last century research has been conducted on the development of the aerobic granular sludge technology for wastewater treatment. A first STOWA pilot research project was executed at Ede, Netherlands. In 2005 a technological breakthrough was accomplished and was the starting sign for a broader national development program (NNOP). Next to STOWA, Delft University of Delft and DHV, six Waterboards are involved within this development program. Main goal of the NNOP is to develop a new competitive biological wastewater treatment technology (Nereda). After the Ede project additional pilot research projects were conducted at four locations in the Netherlands. Within these pilot research projects the following aspects were investigated: granulation on different wastewater types; stability of granular sludge; optimization of nitrogen and phosphate removal, especially during winter time; control of effluent suspended solids concentration; and obtain technological design parameters for full scale WWTPs (waste water treatment plants) [Dutch] In dit rapport staan de resultaten beschreven van de tussen 2003 en 2010 uitgevoerde pilots met de aeroob-korrelslibtechnologie Nereda. Dit is een nieuwe zuiveringstechnologie waarbij het reinigende actief slib geen vlokken maar korrels vormt. Hierdoor bezinkt het slib sneller en makkelijker. De technologie wordt gekenmerkt door hoge zuiveringsrendementen, weinig ruimtebeslag (voor bezinking) en relatief lage energiekosten. De resultaten van de pilots zijn dermate goed, dat drie van de vijf deelnemende waterschappen hebben besloten om 1 van hun rwzi's (rioolwaterzuiveringsinstallaties) aan te passen op basis van de Nereda-technologie.

  8. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.; Brandenberger, Jill M.; Pino, Christian; Martinez, Dominique M.; Rana, Komal; Wellman, Dawn M.

    2014-11-20

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on

  9. Enhanced neurorehabilitation techniques in the DVBIC Assisted Living Pilot Project.

    Science.gov (United States)

    Hoffman, Stuart W; Shesko, Kristina; Harrison, Catherine R

    2010-01-01

    Traumatic Brain Injury has been labeled the "silent epidemic" in our current wars. Both CBO and the RAND reports predict that the costs of these injuries will be both extensive and enduring. The projected costs are based not only upon the loss contribution of these warriors to our economy, but also the long-term medical and assistive care that will be needed to support these veterans for decades to come. Thus, the primary goal of the Assisted Living Pilot Project (ALPP) at the Defense and Veterans Brain Injury Center - Johnstown (DVBIC-J) is to promote the ability of the injured warrior to move from assisted living to living independently and to be self-supporting by providing a continuum of care. To accomplish this goal the DVBIC-J ALPP is providing full set of traditional services (physical, occupational, speech, psychological/cognitive, social/familial, vocational, and spiritual), along with "cutting-edge" rehabilitative treatment technologies. These cutting-edge therapies include transdisciplinary clinical consultations, interactive patient and family counseling, and telemedicine-teleconferencing for clinical evaluations and family/significant other care participation. These services will be available to those who require assisted living through their progression to community re-entry. The ALPP also serves as a vehicle for clinical trials to investigate the effects of an enriched environment (e.g., recreational therapies, massage, multisensory stimulation, etc.) on neurorehabilitation therapy, rural telemedicine for servicemembers with traumatic brain injury, and long-term outcome measures of those who have received neurorehabilitation services at the DVBIC-J site. DVBIC-J is also developing collaborative projects with universities and private industry to create an incubator for new rehabilitation technologies. The technologies that DVBIC-J will be focusing on will include assistive technologies (to assist cognitive, physical, and communicative impairments

  10. PV/T slates - Pilot project in Steinhausen; PV/T-Schiefer. Pilotprojekt Steinhausen

    Energy Technology Data Exchange (ETDEWEB)

    Kropf, S.

    2003-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) is one a series of five reports dealing with increasing the overall efficiency of photovoltaic (PV) installations by also using the heat collected by the dark-coloured PV panels. The work reported on addresses open questions on the use of the heat and its optimal use. This report deals with a ventilated PV-tile system (PV/T-Slates) mounted on a garden shed in Steinhausen, Switzerland. The installation provides power and heat to the main house. The report describes the construction and operation of this pilot project and the results of measurements made on its electrical and thermal performance. The results of measurements made are presented in detail in graphical form and compared with the results of simulation. Suggestions are made for the optimisation of the system. Figures are presented on energy production and energy flows in graphical form.

  11. Global Change Data Base Pilot (Diskette) Project for Africa. Dase base documentation version 1.1

    Science.gov (United States)

    1992-06-01

    The data base for Africa contains vegetation data, climate data, and other thematic data for a recent three and a half year period. The documentation contains separate chapters of material edited about separate data sets of the overall Global Change Data Base, Pilot (diskette) Project for Africa. Descriptions of data formats, authors, and contributors are accompanied by documentation of the development/use of the data. These materials have been suggested and contributed directly by the authors of the individual data sets. To avoid confusion, some information contained in the documentation that is not directly relevant to the data base has been either omitted, crossed out, or blanked out.

  12. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  13. Two related narratives: learning from an evaluation of a short coaching workshop and a pilot coaching project

    Directory of Open Access Journals (Sweden)

    Keith Jones

    2015-11-01

    Full Text Available Background and context: A key role of the district’s Nursing Midwifery Practice and Workforce Unit is to build capability in the nursing and midwifery workforce. In this paper I reflect on the experience of my team following attendance at a two-day Coaching for Performance workshop and the impact this had on developing coaching skills for nurse managers and nurse unit managers in South Eastern Sydney Local Health District. Aims: To highlight how engaging in critical reflection enabled the unit team to identify gaps in the transfer of coaching skills learned from the two-day workshop to everyday management practices. The pilot project to embed coaching into management practices is the result of the team’s reflection. The method, findings and implications for coaching practices for nurse managers and nurse unit managers are described in detail. Findings: Using Gibbs’ model of reflection, the unit team reflected on its collective experiences following attendance at the workshop. This led to the development of a pilot coaching project called Embedding Coaching into Practice for nurse managers and nurse unit managers, which enabled the transfer of coaching skills learned to everyday management practices. The pilot project used a ‘coaching the coach’ approach, with structured follow-up at the managers’ places of work. This had a positive impact on the development of coaching skills and managers were able to use these skills with confidence to enable their staff to develop problem-solving skills. Conclusions: This paper highlights how using a validated tool for reflection can lead to positive change. ‘Coaching the coach’ can support transfer of coaching skills learned into everyday practices, which has a positive impact on work performance for nurse managers, nurse unit managers and their staff. It supports the practice development principle that lifelong learning can influence effective workplace cultures and have a positive impact on

  14. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  15. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  16. Managing globally distributed expertise with new competence management solutions: a big-science collaboration as a pilot case.

    OpenAIRE

    Ferguson, J; Koivula, T; Livan, M; Nordberg, M; Salmia, T; Vuola, O

    2003-01-01

    In today's global organisations and networks, a critical factor for effective innovation and project execution is appropriate competence and skills management. The challenges include selection of strategic competences, competence development, and leveraging the competences and skills to drive innovation and collaboration for shared goals. This paper presents a new industrial web-enabled competence management and networking solution and its implementation and piloting in a complex big-science ...

  17. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  18. Personality Test Scores that Distinguish U.S. Air Force Remotely Piloted Aircraft Drone Pilot Training Candidates

    Science.gov (United States)

    2014-02-18

    advancement of aviation drone technology has led to significant developments and improvements in the capabilities of military remotely piloted aircraft...stress; less excitement seeking and action oriented; less assertive; more socially introverted and withdrawn; more socially compliant and...to age and educational differences. Fifth, evaluations that involve selection and assessment of pilot applicants should include collateral sources of

  19. Skate Genome Project: Cyber-Enabled Bioinformatics Collaboration

    Science.gov (United States)

    Vincent, J.

    2011-01-01

    The Skate Genome Project, a pilot project of the North East Cyber infrastructure Consortium, aims to produce a draft genome sequence of Leucoraja erinacea, the Little Skate. The pilot project was designed to also develop expertise in large scale collaborations across the NECC region. An overview of the bioinformatics and infrastructure challenges faced during the first year of the project will be presented. Results to date and lessons learned from the perspective of a bioinformatics core will be highlighted.

  20. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  1. ExoGeoLab Pilot Project for Landers, Rovers and Instruments

    Science.gov (United States)

    Foing, Bernard

    2010-05-01

    We have developed a pilot facility with a Robotic Test Bench (ExoGeoLab) and a Mobile Lab Habitat (ExoHab). They can be used to validate concepts and external instruments from partner institutes. The ExoGeoLab research incubator project, has started in the frame of a collaboration between ILEWG (International Lunar Exploration working Group http://sci.esa.int/ilewg), ESTEC, NASA and academic partners, supported by a design and control desk in the European Space Incubator (ESI), as well as infrastructure. ExoGeoLab includes a sequence of technology and research pilot project activities: - Data analysis and interpretation of remote sensing and in-situ data, and merging of multi-scale data sets - Procurement and integration of geophysical, geo-chemical and astrobiological breadboard instruments on a surface station and rovers - Integration of cameras, environment and solar sensors, Visible and near IR spectrometer, Raman spectrometer, sample handling, cooperative rovers - Delivery of a generic small planetary lander demonstrator (ExoGeoLab lander, Sept 2009) as a platform for multi-instruments tests - Research operations and exploitation of ExoGeoLab test bench for various conceptual configurations, and support for definition and design of science surface packages (Moon, Mars, NEOs, outer moons) - Field tests of lander, rovers and instruments in analogue sites (Utah MDRS 2009 & 2010, Eifel volcanic park in Sept 2009, and future campaigns). Co-authors, ILEWG ExoGeoLab & ExoHab Team: B.H. Foing(1,11)*#, C. Stoker(2,11)*, P. Ehrenfreund(10,11), L. Boche-Sauvan(1,11)*, L. Wendt(8)*, C. Gross(8, 11)*, C. Thiel(9)*, S. Peters(1,6)*, A. Borst(1,6)*, J. Zavaleta(2)*, P. Sarrazin(2)*, D. Blake(2), J. Page(1,4,11), V. Pletser(5,11)*, E. Monaghan(1)*, P. Mahapatra(1)#, A. Noroozi(3), P. Giannopoulos(1,11) , A. Calzada(1,6,11), R. Walker(7), T. Zegers(1, 15) #, G. Groemer(12)# , W. Stumptner(12)#, B. Foing(2,5), J. K. Blom(3)#, A. Perrin(14)#, M. Mikolajczak(14)#, S. Chevrier(14

  2. Developing a Pilot Maritime Spatial Plan for the Pomeranian Bight and Arkona Basin

    DEFF Research Database (Denmark)

    Käppeler, Bettina; Toben, Susan; Chmura, Grazyna

    2012-01-01

    This report presents the result of a pilot project carried out as part of the EU-­‐funded BaltSeaPlan project (2009-­‐2011). A team of experts with diverse professional backgrounds worked over a period of two years to draft a pilot transboundary maritime spatial plan for a sea area in the Pomeran......This report presents the result of a pilot project carried out as part of the EU-­‐funded BaltSeaPlan project (2009-­‐2011). A team of experts with diverse professional backgrounds worked over a period of two years to draft a pilot transboundary maritime spatial plan for a sea area...... in the Pomeranian Bight/Arkona Basin. The draft spatial plan is the result of a planning exercise which took place outside the formal planning processes as legally binding agreements already exist for the German EEZ and the territorial waters of Mecklenburg-­‐Vorpommern. Working with diverse stakeholders in Poland...... tangible output, the pilot project was also a test case of working with the MSP planning cycle across national borders, bringing together four different planning systems and traditions in the attempt to come to joint solutions in a sea area faced with multiple pressures. In line with the MSP planning cycle...

  3. The experiences of student nurses on placements with practice nurses : a pilot study

    OpenAIRE

    Gale, Julia; Ooms, Ann; Sharples, Kath; Marks-Maran, Di

    2016-01-01

    To prepare the registered nurse of tomorrow in the United Kingdom (UK) to care for patients in general practice (GP)-led services, today's student nurses need to have the opportunity to experience placements with practice nurses to enable them to make positive career choices to become practice nurses in the future. The role of the practice nurse is described in the article. As a pilot project, seventeen students undertook placements with practice nurses in one of seven GP practices selected b...

  4. Evaluation of the 'Alternative Commissioning of Experts Pilot'\\ud \\ud Pilot’

    OpenAIRE

    Tucker, Jason; Moorhead, Richard Lewis; Doughty, Julie

    2011-01-01

    This project evaluated a pilot engaging six multi-disciplinary teams commissioned by the Legal Services Commission to provide expert witness services in proceedings under section 31 Children Act 1989.\\ud Pilot teams did not attract large numbers of cases, with two teams undertaking no cases under the pilot. Lack of awareness of the pilot, the duration of the pilot and concerns (particularly amongst lawyers) about the implications of team-based expert witness services all inhibited take-up. Ju...

  5. Development of a Pilot Data Management Infrastructure for Biomedical Researchers at University of Manchester – Approach, Findings, Challenges and Outlook of the MaDAM Project

    Directory of Open Access Journals (Sweden)

    Meik Poschen

    2012-12-01

    Full Text Available Management and curation of digital data has been becoming ever more important in a higher education and research environment characterised by large and complex data, demand for more interdisciplinary and collaborative work, extended funder requirements and use of e-infrastructures to facilitate new research methods and paradigms. This paper presents the approach, technical infrastructure, findings, challenges and outlook (including future development within the successor project, MiSS of the ‘MaDAM: Pilot data management infrastructure for biomedical researchers at University of Manchester’ project funded under the infrastructure strand of the JISC Managing Research Data (JISCMRD programme. MaDAM developed a pilot research data management solution at the University of Manchester based on biomedical researchers’ requirements, which includes technical and governance components with the flexibility to meet future needs across multiple research groups and disciplines.

  6. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  7. Knowledge Exchange Trials: Pilot Programme Bridging the Academic-Policy Divide

    OpenAIRE

    Fieldhouse, E; Widdop, P; Bunglawala, Z

    2015-01-01

    The ESRC supported Manchester and Cambridge Universities to undertake pilot knowledge exchange projects in 2013-2014 to extend understanding of the issues facing social scientists seeking to interact with non academic communities and to increase knowledge of effective knowledge exchange (that helps non academics apply social science to their work for positive social and economic benefit). This is a brief summary of University of Manchester’s pilot knowledge exchange project.

  8. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  9. Rockfish Pilot Permit Program (RPP)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Rockfish Pilot Program was a five-year project that allowed harvesters to form voluntary cooperatives and receive an exclusive harvest privilege for groundfish...

  10. External validity of individual differences in multiple cue probability learning: The case of pilot training

    Directory of Open Access Journals (Sweden)

    Nadine Matton

    2013-09-01

    Full Text Available Individuals differ in their ability to deal with unpredictable environments. Could impaired performances on learning an unpredictable cue-criteria relationship in a laboratory task be associated with impaired learning of complex skills in a natural setting? We focused on a multiple-cue probability learning (MCPL laboratory task and on the natural setting of pilot training. We used data from three selection sessions and from the three corresponding selected pilot student classes of a national airline pilot selection and training system. First, applicants took an MCPL task at the selection stage (N=556; N=701; N=412. Then, pilot trainees selected from the applicant pools (N=44; N=60; N=28 followed the training for 2.5 to 3 yrs. Differences in final MCPL performance were associated with pilot training difficulties. Indeed, poor MCPL performers experienced almost twice as many pilot training difficulties as better MCPL performers (44.0% and 25.0%, respectively.

  11. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  12. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  13. Communication Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Annah (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-09-15

    The project of building a large wind farm like Lillgrund, the third largest offshore wind farm in the world, takes a considerable effort when it comes to communication and information. When the main questions 'What should be communicated?', 'To whom should this information be communicated?' and 'How should the information be communicated?' are answered, it is time to take action and actually communicate and inform. A fundamental part of the communication process is psychology. For the entrepreneur to understand that people are worried about the possible change in their living situation and deal with that is essential for how people are going to react to the plans of a potential wind farm. When Vattenfall bought the Lillgrund project a humble tone and availability were two key components in the way in which the project group approached the local residents, authorities and the general public. The goal was to achieve acceptance from the local residents and authorities and make them feel comfortable with the project and Vattenfall. Communication has been a cornerstone of the project during the whole process. A few of the activities that were carried out are media activities, open meetings for the public, exhibitions, advertisements, meetings with authorities, internal and external study visits to the site, cooperation with Malmoe city, participation in conferences and a grand opening ceremony. The basis for the activities has been the active inviting of organisations, neighbours and others. Thanks to the efforts of the whole project group and all others that were involved, the communication process was very successful. The 'Lillgrund model' will be the foundation for coming communication processes and has provided Vattenfall with a lot of experience regarding communication and information issues

  14. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  15. Research and Development Projects with ICT and students as learning designers in Primary Schools

    DEFF Research Database (Denmark)

    Levinsen, Karin; Sørensen, Birgitte Holm; Tosca, Susana

    2014-01-01

    In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... to the need to strengthen the populations’ digital literacy and 21st century competencies. The call’s scope was research and development projects as pilot school experiments in relation to five selected areas. The selected projects should contribute with new generalizable and practice oriented knowledge...... of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices...

  16. An Introduction to the Tibet cGPS pilot project: TigiCAS

    Science.gov (United States)

    Zhang, Z.; Liu, J.; Galetzka, J.; Avouac, J.; Tapponnier, P.; Zeng, L.; Gan, W.; Shen, Z.; Wang, M.

    2007-12-01

    The convergence between India and Eurasia is the¡¡prototype of continental collision in action. Compared¡¡to geological history and fault kinematics studies, the present-day, regional pattern of strain-partitioning¡¡is still inadequately known. Among limited geodetic¡¡efforts in the past decade or two, most have been focused¡¡on refining measurements of the current crustal¡¡shortening rate across the Himalaya. The vast region¡¡immediately to the north is sparsely instrumented, with only one continuous GPS station (Lhasa) within¡¡the plateau proper. Campaign stations are few and¡¡ill-positioned, mostly along major roads, providing¡¡poor constraints on present-day slip-rates on individual¡¡active faults. The extant GPS network configuration is thus still insufficient to discriminate between block vs continuum deformation. In November 2006, the¡¡Chinese Academy of Sciences led a pilot program and¡¡installed 6 continuous GPS stations in southern Tibet, crossing the NS-trending normal fault systems and¡¡complementing the Nepal cGPS profiles. We present¡¡here the new sites, preliminary data processing results, and the spatial relationship with ongoing or planned¡¡continuous GPS sites from a couple of other projects. Together with such projects, TigiCAS will provide¡¡a substantial increase in geodetic data in the¡¡Himalayan-Tibet convergent belt in the next few¡¡years, and lead to a better understanding of¡¡contemporary deformation of the region.

  17. The first results of pilot project on combined preventive suplementation of iodine- and iron deficiency conditions in Tyumen region

    Directory of Open Access Journals (Sweden)

    G V Sharuho

    2010-12-01

    Full Text Available In 2008–2010 pilot project were realized in Tyumen region on combined preventive maintenance iodine deficiency and iron deficiency conditions, within the framework of which children from pilot of the territory got feeding, enriched premixes of the iodine and ferric while checking group has formed the children, getting monoprevention iodized salt. In study were examined 467 children. Frequency of the goiter on ultrasonography in pilot territory fell from 19.8 to 6.4%, in checking from 12.5 to 10.1%. In group teenager on background combined micronutrient preventive maintenance frequency tests ferritin less 15 mcg/l fell for 76 weeks in four times (p = 0.000, herewith average factors in 2010 above, than in 2008 (p = 0.114. In group teenager checking territory on background monoprevention frequency of the lowered tests ferritin more, than in group on background of the combined preventive maintenance in 2 times (p = 0.004, improvements for period of the study is not revealed.Dynamics indices of iodine deficiency conditions on background of the combined preventive maintenance and monoprevention confirms greater efficiency of the simultaneous using the products fortifications iodine and iron. Shown efficiency micronutrient preventive maintenances of the latent deficit ferric fortifications bread.

  18. A competency based selection procedure for Dutch postgraduate GP training: a pilot study on validity and reliability.

    Science.gov (United States)

    Vermeulen, Margit I; Tromp, Fred; Zuithoff, Nicolaas P A; Pieters, Ron H M; Damoiseaux, Roger A M J; Kuyvenhoven, Marijke M

    2014-12-01

    Abstract Background: Historically, semi-structured interviews (SSI) have been the core of the Dutch selection for postgraduate general practice (GP) training. This paper describes a pilot study on a newly designed competency-based selection procedure that assesses whether candidates have the competencies that are required to complete GP training. The objective was to explore reliability and validity aspects of the instruments developed. The new selection procedure comprising the National GP Knowledge Test (LHK), a situational judgement tests (SJT), a patterned behaviour descriptive interview (PBDI) and a simulated encounter (SIM) was piloted alongside the current procedure. Forty-seven candidates volunteered in both procedures. Admission decision was based on the results of the current procedure. Study participants did hardly differ from the other candidates. The mean scores of the candidates on the LHK and SJT were 21.9 % (SD 8.7) and 83.8% (SD 3.1), respectively. The mean self-reported competency scores (PBDI) were higher than the observed competencies (SIM): 3.7(SD 0.5) and 2.9(SD 0.6), respectively. Content-related competencies showed low correlations with one another when measured with different instruments, whereas more diverse competencies measured by a single instrument showed strong to moderate correlations. Moreover, a moderate correlation between LHK and SJT was found. The internal consistencies (intraclass correlation, ICC) of LHK and SJT were poor while the ICC of PBDI and SIM showed acceptable levels of reliability. Findings on content validity and reliability of these new instruments are promising to realize a competency based procedure. Further development of the instruments and research on predictive validity should be pursued.

  19. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  20. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  1. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  2. Pilot's Automated Weather Support System (PAWSS) concepts demonstration project. Phase 1: Pilot's weather information requirements and implications for weather data systems design

    Science.gov (United States)

    Crabill, Norman L.; Dash, Ernie R.

    1991-01-01

    The weather information requirements for pilots and the deficiencies of the current aviation weather support system in meeting these requirements are defined. As the amount of data available to pilots increases significantly in the near future, expert system technology will be needed to assist pilots in assimilating that information. Some other desirable characteristics of an automation-assisted system for weather data acquisition, dissemination, and assimilation are also described.

  3. Computer aided process planning at the Oak Ridge Y-12 plant: a pilot project

    International Nuclear Information System (INIS)

    Hewgley, R.E. Jr.; Prewett, H.P. Jr.

    1979-01-01

    In 1976, a formal needs analysis was conducted in one of the Fabrication Division Shops of all activities from the receipt of an order through final machining. The results indicated deficiencies in process planning activities involving special production work. A pilot program was organized to investigate the benefits of emerging CAM technology and application of GT concepts for machining operations at the Y-12 Plant. The objective of the CAPP Project was to provide computer-assisted process planning for special production machining in th shop. The CAPP team was charged with the specific goal of demonstrating computer-aided process planning within a four-year term. The CAPP charter included a plan with intermediate measurable milestones for achieving its mission. In three years, the CAPP project demonstrated benefits to process planning. A capability to retrieve historical records for similar parts, to review accurately the status of all staff assignments, and to generate detailed machining procedures definitely can impact the way in which a machine shop prepared for new orders. The real payoff is in the hardcopy output (N/C programs, studies, sequence plans, and procedures). 4 figures,

  4. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Wiehagen, J. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Del Bianco, M. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Mallay, D. [Partnership for Home Innovation, Upper Marlboro, MD (United States)

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

  5. Magnetohydrodynamics: Parallel computation of the dynamics of thermonuclear and astrophysical plasmas. 1. Annual report of massively parallel computing pilot project 93MPR05

    International Nuclear Information System (INIS)

    1994-08-01

    This is the first annual report of the MPP pilot project 93MPR05. In this pilot project four research groups with different, complementary backgrounds collaborate with the aim to develop new algorithms and codes to simulate the magnetohydrodynamics of thermonuclear and astrophysical plasmas on massively parallel machines. The expected speed-up is required to simulate the dynamics of the hot plasmas of interest which are characterized by very large magnetic Reynolds numbers and, hence, require high spatial and temporal resolutions (for details see section 1). The four research groups that collaborated to produce the results reported here are: The MHD group of Prof. Dr. J.P. Goedbloed at the FOM-Institute for Plasma Physics 'Rijnhuizen' in Nieuwegein, the group of Prof. Dr. H. van der Vorst at the Mathematics Institute of Utrecht University, the group of Prof. Dr. A.G. Hearn at the Astronomical Institute of Utrecht University, and the group of Dr. Ir. H.J.J. te Riele at the CWI in Amsterdam. The full project team met frequently during this first project year to discuss progress reports, current problems, etc. (see section 2). The main results of the first project year are: - Proof of the scalability of typical linear and nonlinear MHD codes - development and testing of a parallel version of the Arnoldi algorithm - development and testing of alternative methods for solving large non-Hermitian eigenvalue problems - porting of the 3D nonlinear semi-implicit time evolution code HERA to an MPP system. The steps that were scheduled to reach these intended results are given in section 3. (orig./WL)

  6. Magnetohydrodynamics: Parallel computation of the dynamics of thermonuclear and astrophysical plasmas. 1. Annual report of massively parallel computing pilot project 93MPR05

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-01

    This is the first annual report of the MPP pilot project 93MPR05. In this pilot project four research groups with different, complementary backgrounds collaborate with the aim to develop new algorithms and codes to simulate the magnetohydrodynamics of thermonuclear and astrophysical plasmas on massively parallel machines. The expected speed-up is required to simulate the dynamics of the hot plasmas of interest which are characterized by very large magnetic Reynolds numbers and, hence, require high spatial and temporal resolutions (for details see section 1). The four research groups that collaborated to produce the results reported here are: The MHD group of Prof. Dr. J.P. Goedbloed at the FOM-Institute for Plasma Physics `Rijnhuizen` in Nieuwegein, the group of Prof. Dr. H. van der Vorst at the Mathematics Institute of Utrecht University, the group of Prof. Dr. A.G. Hearn at the Astronomical Institute of Utrecht University, and the group of Dr. Ir. H.J.J. te Riele at the CWI in Amsterdam. The full project team met frequently during this first project year to discuss progress reports, current problems, etc. (see section 2). The main results of the first project year are: - Proof of the scalability of typical linear and nonlinear MHD codes - development and testing of a parallel version of the Arnoldi algorithm - development and testing of alternative methods for solving large non-Hermitian eigenvalue problems - porting of the 3D nonlinear semi-implicit time evolution code HERA to an MPP system. The steps that were scheduled to reach these intended results are given in section 3. (orig./WL).

  7. Integrating Intimate Partner Violence Screening and Counseling in a Family Planning Clinic: Evaluation of a Pilot Project in Conakry, Guinea.

    Science.gov (United States)

    Samandari, Ghazaleh; Delamou, Alexandre; Traore, Pernamou; Diallo, Fatoumata Guilinty; Millimono, Sita; Camara, Bienvenu Salim; Laffe, Kira; Verani, Fabio; Tolliver, Maimouna

    2016-06-01

    Few programs exist to address Intimate Partner Violence (IPV) in Guinea. In 2014, Engender Health, in partnership with the local health authorities in Conakry, Guinea, piloted an integrated approach to IPV screening and counseling, within an existing family planning clinic. This article describes both the process of formulating and implementing this approach, as well as the results of an evaluation of the program. From January to June of 2014, Engender Health staff trained midwives at the Conakry International Planned Parenthood Federation family planning clinic staff in screening and counseling client for IPV. Program evaluators used project records, interview with program staff (n=3), midwives (n=3) and client exit interviews (n=53) to measure the outcomes of this pilot project. Regardless of their IPV status, clients appreciated having a venue in which to discuss IPV. Program staff also felt empowered by the additional training and support for IPV screening. The evaluation yielded valuable suggestions for improvement, including more time for staff training and mock client interview practice, additional skills in counseling, and stronger referral links for women who screen positive for IPV. Integrating IPV screening into family planning services is an important and feasible method for reaching vulnerable women with IPV services.

  8. Impact of a Student Pharmacist Driven Medication Reconciliation and Antidepressant Treatment History Project at a Depression Clinic: A Pilot Study

    Science.gov (United States)

    Tang, Stella S.; Jaward, Leanna; Ward, Kristen; Parikh, Sagar V.; Bostwick, Jolene R.

    2017-01-01

    Objectives To improve treatment of patients with depression, a new pilot service project involving student pharmacists who would conduct medication reconciliation and review of antidepressant treatment history was created and evaluated. Experimental design A prospective study conducted at the University of Michigan Depression Center. Principal observations From an initial sample of 78 referrals, 41 subjects were reached by phone, with 34 completing medication reconciliation and antidepressant treatment history. Of the 34 patients, 25 (73.5%) had at least one discrepancy identified in their medication list, resulting in 164 medication changes in the electronic medical record (EMR). A total of 105 past antidepressant trials were documented in the 34 individuals, with 34 (32.4%) trials found to be inadequate. Thirteen (38.2%) patients reported failure to respond to two different antidepressants from different classes. All 34 patients participated well in the phone calls and were willing to consult a pharmacist at their upcoming clinic visit. Conclusions A student pharmacist pilot was feasible, identified many discrepancies in the medication record, and identified important medication treatment history in patients with depression in advance of the clinic visit. The project provides support for a specialized role for student pharmacists and demonstrates that interprofessional care can contribute to improved treatment of depression. PMID:28626270

  9. Evaluation of the School Breakfast Program Pilot Project: Final Report. Special Nutrition Programs. Report Number CN-04-SBP. Nutrition Assistance Program Report Series

    Science.gov (United States)

    Bernstein, Lawrence S.; McLaughlin, Joan E.; Crepinsek, Mary Kay; Daft, Lynn M.

    2004-01-01

    In 1998, Congress authorized the School Breakfast Program Pilot Project (SBPP) to study the implementation and effects of providing universal free school breakfast in six school districts across the United States. For three years, from School Year (SY) 2000-2001 through SY 2002-2003, these six school districts received federal funds to offer…

  10. A pilot study on acoustic regulations for schools – Comparison between selected countries in Europe

    DEFF Research Database (Denmark)

    Rasmussen, Birgit; Guigou-Carter, Catherine

    2016-01-01

    of descriptors and limit values for acoustic requirements. The paper includes examples of acoustic regulations for schools, including specific sound insulation requirements on airborne and impact sound insulation, limit values for noise from traffic and from service equipment and in addition on reverberation......Acoustic regulations for schools exist in most countries in Europe, the main reasons being improving learning conditions for pupils and work conditions for teachers. As a pilot study, comparison between requirements in selected countries in Europe has been carried out. The findings show a diversity...... time for class rooms. Furthermore, the discrepancies between countries are being discussed and some priorities for adjusting acoustic regulations in some countries indicated....

  11. Wave Pressures and Loads on a Small Scale Model of the Svåheia SSG Pilot Project

    DEFF Research Database (Denmark)

    Buccino, Mariano; Vicinanza, Diego; Ciardulli, Francesco

    2011-01-01

    The paper reports on 2D small scale experiments conducted to investigate wave loadings acting on a pilot project of device for the conversion of wave energy into electricity. The conversion concept is based on the overtopping principle and the structure is worldwide known with the acronym SSG....... The hydraulic model tests have been carried out at the LInC laboratory of the University of Naples Federico II using random waves. Results indicate wave overtopping is able to cause a sudden inversion of vertical force under wave crest, so that it is alternatively upward and downward directed over a short time...

  12. A pilot modeling technique for handling-qualities research

    Science.gov (United States)

    Hess, R. A.

    1980-01-01

    A brief survey of the more dominant analysis techniques used in closed-loop handling-qualities research is presented. These techniques are shown to rely on so-called classical and modern analytical models of the human pilot which have their foundation in the analysis and design principles of feedback control. The optimal control model of the human pilot is discussed in some detail and a novel approach to the a priori selection of pertinent model parameters is discussed. Frequency domain and tracking performance data from 10 pilot-in-the-loop simulation experiments involving 3 different tasks are used to demonstrate the parameter selection technique. Finally, the utility of this modeling approach in handling-qualities research is discussed.

  13. Identifying Best Bet Entry-Level Selection Measures for US Air Force Remotely Piloted Aircraft (RPA) Pilot and Sensor Operator (SO) Occupations

    Science.gov (United States)

    2011-12-01

    occupations (pilots, combat system operators, air battle managers) (Carretta, 2008; Carretta & Ree, 2003; Olea & Ree, 1994). This body of knowledge...Ergonomics, 50(7), 1064-1091. O’Hare, D. (1997). Cognitive ability determinants of elite pilot performance. Human Factors, 39, 540-552. Olea

  14. Piloting a community-based micro-hydro power generation project

    International Nuclear Information System (INIS)

    Buenafe, Menandro B.; Eponio, Melchor P.

    1998-01-01

    A community based microhydro power generation project was successfully piloted in Dulao, Malibcong, Abra. The project started with the identification and evaluation of five potential creeks flowing near villages in the Cordillera hinterlands. All the sites showed comparative hydrologic features except for one factor that decided the project's implementation: the willingness of the people to invest by providing their labor- counterpart. On this account, only the residents of Dulao put their full trust in the implementing institutions, the main reason for the project's success. The micro-hydro power project consisted of an earthen diversion canal that conveyed part of the streamflow unto a forebay located above the powerhouse. The forebay was built of riprap and concrete, equipped with a desilting chamber, trashrack, a spillway, and an overflow canal that directed water to the ricefields downstream. A polyethylenevinyl penstock was laid underground along the slope,from the forebay to the powerhouse. The penstock assumed a Y-configuration inside the powerhouse where the two crossflow turbines were separately mounted on each arms. Two butterfly valves were positioned just before each turbine so that flow can be alternately controlled for the two machines. A tailrace drained the discharge from the turbines back to the same creek. Originally, the setup could only operate the 3kw turbine that ran the ricemill by means of a flat belt drive. Upon further hydrologic study, an 8kw crossflow turbine was installed to a drive a 7.5kva, two-pole, single phase alternator. The 8kw turbine can operate under three design flows, namely: 20,40, and 60 liters per second. The turbine-alternator setup was achieved by a pulley and belt drive arrangement. Typically, the AC generator was provided with monitoring instruments like a volt meter, frequency meter, and ampere meter. An electronic load controller (ELC) was observed to effectively protect the alternator from runaway speeds, over

  15. NSTAR Smart Grid Pilot

    Energy Technology Data Exchange (ETDEWEB)

    Rabari, Anil [NSTAR Electric, Manchester, NH (United States); Fadipe, Oloruntomi [NSTAR Electric, Manchester, NH (United States)

    2014-03-31

    NSTAR Electric & Gas Corporation (“the Company”, or “NSTAR”) developed and implemented a Smart Grid pilot program beginning in 2010 to demonstrate the viability of leveraging existing automated meter reading (“AMR”) deployments to provide much of the Smart Grid functionality of advanced metering infrastructure (“AMI”), but without the large capital investment that AMI rollouts typically entail. In particular, a central objective of the Smart Energy Pilot was to enable residential dynamic pricing (time-of-use “TOU” and critical peak rates and rebates) and two-way direct load control (“DLC”) by continually capturing AMR meter data transmissions and communicating through customer-sited broadband connections in conjunction with a standardsbased home area network (“HAN”). The pilot was supported by the U.S. Department of Energy’s (“DOE”) through the Smart Grid Demonstration program. NSTAR was very pleased to not only receive the funding support from DOE, but the guidance and support of the DOE throughout the pilot. NSTAR is also pleased to report to the DOE that it was able to execute and deliver a successful pilot on time and on budget. NSTAR looks for future opportunities to work with the DOE and others in future smart grid projects.

  16. Microseismic monitoring during Hydraulic stimulation in Pohang (Korea) for EGS pilot project

    Science.gov (United States)

    Kim, M.; Yoon, B.; Lee, C.; Park, K. G.; Yoon, W. S.; Song, Y.; Lee, T. J.

    2017-12-01

    Since the geothermal anomaly in the Pohang area has been reported in 1960s, various geological and geophysical surveys have been conducted by Korea Institute of Geoscience and Mineral Resources (KIGAM) including gravity, seismic, airborne magnetic and magneto-telluric surveys. Based on these explorations, the Enhanced Geothermal System (EGS) pilot project has been carried out in Pohang since the end of 2010. One vertical well (PX-2, MD 4,348 m) and one deviated well (PX-1, MD 4,362 m) have been drilled in granite rock for the EGS. Microseismic (MS) monitoring is the best way to understand how the fracture grows during the hydraulic stimulation. KIGAM has set up 9 shallow borehole stations (100-130 m), 4 surface stations and two borehole geophones (1,350 and 1,550 m deep) within 5 km radius from injection well for the MS monitoring during hydraulic stimulation. The first hydraulic stimulation started on January 29th to February 20th, 2016 at PX-2 and the second stimulation was conducted in PX-1 from December 15th, 2016 to January 11th, 2017. Several hundreds of MS events occurred during stimulation and the biggest event was ML 2.3 during the shut in period of the second stimulation. Based on the results of the MS monitoring, a soft stimulation is scheduled at PX-1 in cooperation with one of the European Horizon2020 project, DESTRESS (Demonstration of soft stimulation treatments of geothermal reservoirs). We will present the MS monitoring system in Pohang and the data of the stimulation with the MS monitoring results. We believe that the data from Pohang will improve the understanding of seismic behavior due to hydraulic stimulation in crystalline rocks and also will contribute to success of the Pohang EGS project.

  17. One Health in Practice: A Pilot Project for Integrated Care of Zoonotic Infections in Immunocompromised Children and Their Pets in Chile.

    Science.gov (United States)

    Peña, A; Abarca, K; Weitzel, T; Gallegos, J; Cerda, J; García, P; López, J

    2016-08-01

    Although pets provide physiological and psychological benefits to their owners, they are a potential source of zoonotic infections, especially for vulnerable individuals such as immunocompromised patients. During 1 year, we therefore performed a pilot project, which included 32 immunocompromised Chilean children and their family pets (35 dogs and 9 cats) with the aim of detecting, treating and preventing zoonotic infections. Children were examined by Infectious Diseases paediatricians and demographical and clinical information related to zoonotic infections were recorded. Pets were examined and sampled by veterinarians, who also administered missing routine vaccines and anti-parasitics. During family visits, all members were informed and educated about zoonoses and a satisfaction survey was performed. Visits also included vector control and indoor residual spraying with pyrethroids. Children were re-examined and re-tested according to the findings of their pets, and all detected zoonotic infections were treated both in children and pets. Physical examination revealed abnormalities in 18 dogs (51.4%) and three cats (33.3%). Twenty-eight (63.6%) of the pets were diagnosed with a zoonotic pathogen, and seven (15.9%) with a facultative pathogen. Most zoonotic agents were isolated from the pet's external ear and intestine. Bacteria with the highest pathogenic potential were Campylobacter jejuni and Brucella canis. In two children and their respective pets, the same zoonotic diseases were diagnosed (toxocariasis and giardiasis). Arthropods serving as potential vectors of zoonotic infections were found in 49% of dogs and 44% of cats. The pilot project was positively evaluated by the participating families. Our pilot project confirmed that pets are reservoir for various zoonotic agents in Chile and that the implementation of an integrated multidisciplinary programme was a valuable tool to prevent, diagnose and treat such zoonotic infections in vulnerable patients such as

  18. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  19. Engaging the broader community in biodiversity research: the concept of the COMBER pilot project for divers in ViBRANT

    Directory of Open Access Journals (Sweden)

    Christos Arvanitidis

    2011-11-01

    Full Text Available This paper discusses the design and implementation of a citizen science pilot project, COMBER (Citizens’ Network for the Observation of Marine BiodivERsity, http://www.comber.hcmr.gr, which has been initiated under the ViBRANT EU e-infrastructure. It is designed and implemented for divers and snorkelers who are interested in participating in marine biodiversity citizen science projects. It shows the necessity of engaging the broader community in the marine biodiversity monitoring and research projects, networks and initiatives. It analyses the stakeholders, the industry and the relevant markets involved in diving activities and their potential to sustain these activities. The principles, including data policy and rewards for the participating divers through their own data, upon which this project is based are thoroughly discussed. The results of the users analysis and lessons learned so far are presented. Future plans include promotion, links with citizen science web developments, data publishing tools, and development of new scientific hypotheses to be tested by the data collected so far.

  20. Experiences from a pilot study on how to conduct a qualitative multi-country research project regarding use of antibiotics in Southeast Europe.

    Science.gov (United States)

    Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall; Wallach Kildemoes, Helle; Nørgaard, Lotte Stig; Jakupi, Arianit; Raka, Denis; Gürpinar, Emre Umut; Alkan, Ali; Hoxha, Iris; Malaj, Admir; Cantarero, Lourdes Arevalo

    2016-01-01

    In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge regarding how to conduct these types of research projects by evaluating a pilot study of the project. Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused on 'local ownership', 'research quality' and 'feasibility' with regard to successful implementation and evaluation. The evaluation was achieved by interpreting 'Skype' and 'face to face' meetings and email correspondence by applying 'critical common sense'. Local data collectors achieved a sense of joint ownership. Overall, the protocol worked well. Several minor challenges pertaining to research quality and feasibility were identified, in particular obtaining narratives when conducting interviews and recruiting patients for the study. Furthermore, local data collectors found it difficult to allocate sufficient time to the project. Solutions were discussed and added to the protocol. Despite the challenges, it was possible to achieve an acceptable scientific level of research when conducting qualitative multi-country research collaboration under the given circumstances. Specific recommendations to achieve this are provided by the authors.

  1. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  2. Introduction of eLectures at the Medical University of Graz – Results and Experiences from a Pilot Trial

    Directory of Open Access Journals (Sweden)

    Herwig Erich Rehatschek

    2013-01-01

    Full Text Available In autumn 2011 we developed a concept for a new service to be offered for our teachers in connection with virtual lessons: eLectures. eLectures in general are defined as recorded lectures. We offer two kinds of services: InfoSnippets and InfoCasts. InfoSnippets represent short videos visualizing practical skills to be learned by medical students such as measuring the blood pressure or how to make a surgical suture. InfoCasts are recordings of entire lectures including interactive elements. Basic InfoCasts consist of voice recording in combination with synchronized slides. Video is offered only in form of short sections where e.g. practical skills or experiments are shown. With begin of summer semester 2012 we started with four pilot projects of lessons which were fully virtualized. In this paper we present the concept for our eLectures, the selection process of the production software, the realization of the four pilot projects and the evaluation results of the students.

  3. ELECTRONIC COMPLIANCE AND APPROVAL PROJECT (ECAP)

    Energy Technology Data Exchange (ETDEWEB)

    Hope Morgan; Richard A. Varela; Deborah LaHood; Susan Cisco; Mary Ann Benavides; Donna Burks

    2002-11-01

    The Texas Railroad Commission (RRC), working in partnership with the United States Department of Energy and the oil and gas industry it regulates, is implementing a strategy for improving efficiency in regulations and significantly reducing administrative operating costs through the Electronic Compliance and Approval Process (ECAP). The project will streamline regulatory compliance and reporting by providing the ability to electronically submit, process, and query oil and gas applications and reports through the Internet-based ECAP system. Implementation of an ECAP drilling permit pilot project began September 1999 after funding resources were secured--a $700,000 grant from the U.S. Department of Energy and an appropriation of $1.4 million from the Texas Legislature. The pilot project involves creating the ability to file, review, and approve a well's drilling permit application through a completely electronic process. The pilot project solution will ultimately provide the infrastructure, technology, and electronic modules to enable the filing of all compliance permits and performance reports through the internet from a desktop computer. The pilot project was conducted in three phases. The first phase, implemented May 2000, provided the infrastructure that allows the electronic filing and approval of simple drilling permit applications, associated fees, and attachments. The official ''roll-out'' of ECAP and the first electronically filed drilling permit application occurred on May 11, 2000 in Dallas in conjunction with an Internet Workshop sponsored by the Petroleum Technology Transfer Council. After the completion of Phase I, the ECAP team conducted an extensive review of progress to date and analyzed requirements and opportunities for future steps. The technical team identified core infrastructure modifications that would facilitate and better support future development and expansion of the ECAP system and work began on database structure

  4. Mapping the above and belowground biomass in three landscapes in Cameroon, Rwanda and DRC: pilot cases in REDD+ pilot project.

    Science.gov (United States)

    Sufo Kankeu, R.

    2017-12-01

    A number of biomass/carbon maps have been recently produced using different approaches and despite their comparison there is still a gap. To fill this gap there is a need to provide accurate maps based on the field data on all types of land use and land cover. Based on the field data from plots established in three pilot projects around Virunga National park in Rwanda, Tri-national Sangha landscape in Cameroon and lac Télé-Lac Tumba landscape in DRC, this paper intend to analyse the relationship between land use change and biomass and present the variability through biomass/carbon maps. The above and belowground biomass was calculated from 95 nested plots of 20 meters radius. The value of biomass/carbon per plot were thus used to elaborate carbon maps of each study site. In the same the way the correlation between the land use and underground and above ground carbon stock were analysed using geographically weighted regression. These data have been joint with classified Spot 5 image and aggregated to come out will acceptable result. Results show that there is a strong relationship between land use in various project sites and the carbon stock related, the change of a forest cover directly impact on carbon stock/biomass.in the same way carbon map realized base on field data and IDW, Kriging or spline module show an idea on the carbon distribution but the maps are not accurate giving the distance between plots,

  5. Preamble and pilot symbol design for channel estimation in OFDM systems with null subcarriers

    Directory of Open Access Journals (Sweden)

    Ohno Shuichi

    2011-01-01

    Full Text Available Abstract In this article, design of preamble for channel estimation and pilot symbols for pilot-assisted channel estimation in orthogonal frequency division multiplexing system with null subcarriers is studied. Both the preambles and pilot symbols are designed to minimize the l 2 or the l ∞ norm of the channel estimate mean-squared errors (MSE in frequency-selective environments. We use convex optimization technique to find optimal power distribution to the preamble by casting the MSE minimization problem into a semidefinite programming problem. Then, using the designed optimal preamble as an initial value, we iteratively select the placement and optimally distribute power to the selected pilot symbols. Design examples consistent with IEEE 802.11a as well as IEEE 802.16e are provided to illustrate the superior performance of our proposed method over the equi-spaced equi-powered pilot symbols and the partially equi-spaced pilot symbols.

  6. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  7. Managing globally distributed expertise with new competence management solutions a big-science collaboration as a pilot case.

    CERN Document Server

    Ferguson, J; Livan, M; Nordberg, M; Salmia, T; Vuola, O

    2003-01-01

    In today's global organisations and networks, a critical factor for effective innovation and project execution is appropriate competence and skills management. The challenges include selection of strategic competences, competence development, and leveraging the competences and skills to drive innovation and collaboration for shared goals. This paper presents a new industrial web-enabled competence management and networking solution and its implementation and piloting in a complex big-science environment of globally distributed competences.

  8. Solid sample atomic absorption spectroscopy in a chemical contaminant monitoring pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Klein, J.; Schmidt, H.; Dirscherl, C.; Muntau, H.

    1987-09-01

    The Institute for Technology and Hygiene of Food of Animal Origin is developing a practible system of monitoring the distribution of toxic substances in the environment, using the dairy cows as bioindicators. A pilot project has been established to solve basic problems as sampling strategy, sample preparation, analysis and data handling. In the preliminary stage of this study the new technique of SS-AAS turned out to be a useful tool. In order to test overall analytical reliability of the data obtained all analytical procedures applied for the different matrices are controlled by the use of reference material of similar matrix compositions. Results of studies on the distribution of admium and lead are reported; the representativity of small sample amounts of cortical tissue (50-60 mg and 1-2 mg dry mass) has additionally been investigated. Direct analysis of wet tissue aliquots (5-10 mg) was not feasible. A possible method of sample preparation of wet tissue is presented which yields reliable results within 10 min of operation time.

  9. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  10. Physical and cognitive stimulation in Alzheimer Disease. the GAIA Project: a pilot study.

    Science.gov (United States)

    Maci, Tiziana; Pira, Francesco Le; Quattrocchi, Graziella; Nuovo, Santo Di; Perciavalle, Vincenzo; Zappia, Mario

    2012-03-01

    Several data suggest that physical activity and cognitive stimulation have a positive effect on the quality of life (QoL) of people with Alzheimer's disease (AD), slowing the decline due to the disease. A pilot project was undertaken to assess the effect of cognitive stimulation, physical activity, and socialization on patients with AD and their informal caregiver's QoL and mood. Fourteen patients with AD were randomly divided into active treatment group and control group. At the end of treatment, a significant improvement in apathy, anxiety, depression, and QoL in the active treatment group was found. Considering caregivers, those of the active treatment group exhibited a significant improvement in their mood and in their perception of patients' QoL. This study provides evidence that a combined approach based on cognitive stimulation, physical activity, and socialization is a feasible tool to improve mood and QoL in patients with AD and their caregivers.

  11. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  12. Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project

    International Nuclear Information System (INIS)

    Little, M.S.

    1985-05-01

    The Safety Analysis Report (SAR) for the Waste Isolation Pilot Plant (WIPP) Project was first published by the US Department of Energy (DOE), WIPP Project Office (WPO) in 1980. Since that time a total of eight amendments to this Report have been published. As part of its independent evaluation of the WIPP Project for the State of New Mexico, the Environmental Evaluation Group (EEG) maintains a continuing technical assessment of the information in this Report and its amendments. Beginning with the initial publication, and following the amendments, the EEG prepares detailed written comments and recommendations which are submitted to the WPO for consideration in future amendments. The WPO has made many substantial changes to the SAR in response to the EEG's comments. On frequent occasions, meetings between the two groups have been held in an effort to reach an accord on some of the more controversial issues. These meetings generally have been very constructive, but several important areas of conflict remain. In many instances, these areas represent changes which are to be considered by the WPO at some future date, rather than irreconcilable issues. The most important issues remaining to be resolved are included in the discussions of this report, and could be summarized as follows: (1) An amendment of the topical content to be more in accord with the DOE Order 5481.1A and AL 5481.1A. (2) Substantial revisions of the classification of components, structures and systems, and related quality assurance. (3) Revisions to the site geological and hydrologic data based on studies agreed to between DOE and the State

  13. Evaluatie pilot Endogene Factoren

    NARCIS (Netherlands)

    Viet AL; Fiolet D; Voortman JK; Rover C de; Hanning C; Uitenbroek D; Loon AJM van; PZO; GGD Achterhoek; GGD Midden Holland; GG&GD Amsterdam

    2004-01-01

    As a part of the project on the Local and National Monitor for Public Health several pilot studies were carried out in three Municipal Health Centres (GGDs). The first aim was to investigate the feasibility of a physical examination at the health centre in combination with a health interview (or

  14. Energy extension service pilot program evaluation report: the first year. Volume II: pilot state reports

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    Volume II of the Energy Extension Service Evaluation presents a discussion of the operations of the ten EES pilot-state programs during the period from October 1, 1977 through September 30, 1978. Each of the ten pilot states - Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming - received a grant of approximately $1.1 million to develop and implement a 19-month program beginning on October 1, 1977. Volume II provides a case-study description of the operations of the pilot program in each state, with special attention given to the two programs selected in each state for more detailed study and survey research. Some survey data and analysis are presented for the emphasis programs.

  15. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  16. L’Aquila Smart Clean Air City: The Italian Pilot Project for Healthy Urban Air

    Directory of Open Access Journals (Sweden)

    Alessandro Avveduto

    2017-11-01

    Full Text Available Exposure to atmospheric pollution is a major concern for urban populations. Currently, no effective strategy has been adopted to tackle the problem. The paper presents the Smart Clean Air City project, a pilot experiment concerning the improvement in urban air quality. Small wet scrubber systems will be operating in a network configuration in suitable urban areas of L’Aquila city (Italy. The purpose of this work is to describe the project and show the preliminary results obtained in the characterization of two urban sites before the remediation test; the main operating principles of the wet scrubber system will be discussed, as well as the design of the mobile treatment plant for the processing of wastewater resulting from scrubber operation. Measurements of particle size distributions in the range of 0.30–25 µm took place in the two sites of interest, an urban background and a traffic area in the city of L’Aquila. The mean number concentration detected was 2.4 × 107 and 4.5 × 107 particles/m3, respectively. Finally, theoretical assessments, performed by Computational Fluid Dynamics (CFD codes, will show the effects of the wet scrubber operation on air pollutants under different environmental conditions and in several urban usage patterns.

  17. Dashboard and Firms Performance Optimization Using Piloting Indicators

    Directory of Open Access Journals (Sweden)

    Sorinel Capusneanu

    2006-07-01

    Full Text Available Can we analyze the enterprise performances upon the pilot indicators? The answer is completed by analyzing and interpreting the suggested indicators. Finally, these indicators will form the enterprise dashboard, which the management will take the right decisions. The dashboard represents the selection and presentation way of pilot indicators which permit tendencies visualization leaving from enterprise’s followed objectives. Through analyses and interpretation of pilot indicators, it is generating actions which contribute to enterprise’s improvement performances.

  18. "i h8 u": The Influence of Normative Beliefs and Hostile Response Selection in Predicting Adolescents' Mobile Phone Aggression--A Pilot Study

    Science.gov (United States)

    Nicol, Annemarie; Fleming, Michele J.

    2010-01-01

    Mobile phone aggression (MPA) is a relatively new phenomenon. Using newly developed measures, a pilot study was conducted with 348 adolescents ages 13-17 years to determine the incidence of MPA and victimization in this group of adolescents and to test a proposed model in which hostile response selection mediated the relationship between normative…

  19. On quantifying uncertainty for project selection: the case of renewable energy sources' investment

    International Nuclear Information System (INIS)

    Kirytopoulos, Konstantinos; Rentizelas, Athanassios; Tziralis, Georgios

    2006-01-01

    The selection of a project among different alternatives, considering the limited resources of a company (organisation), is an added value process that determines the prosperity of an undertaken project (investment). This applies also to the 'boming' Renewable Energy Sector, especially under the circumstances established by the recent activation of the Kyoto protocal and by the plethora of available choices for renewable energy sources (RES) projjects. The need for a reliable project selection method among the various alternatives is, therefore, highlighted and, in this context, the paper proposes the NPV function as one of possible criteria for the selection of a RES project. Furthermore, it differentiates from the typical NPV calculation process by adding the concept of a probabilistic NPV approach through Monte Carlo simulation. Reality is non-deterministic, so any attempt of modelling it by using a deterministic approach is by definition erroneous. The paper ultimately proposes a process of substituting the point with a range estimation, capable of quantifying the various uncertainty factors and in this way elucidate the accomplishment possibilities of eligible scenarious. The paper is enhanced by case study showing how the proposed method can be practically applied to support the investment decision, thus enabling the decision makers to judge its effectiveness and usefulness.(Author)

  20. Fort Cobb Reservoir Watershed, Oklahoma and Thika River Watershed, Kenya Twinning Pilot Project

    Science.gov (United States)

    Moriasi, D.; Steiner, J.; Arnold, J.; Allen, P.; Dunbar, J.; Shisanya, C.; Gathenya, J.; Nyaoro, J.; Sang, J.

    2007-12-01

    Nairobi. A dam was constructed in 1994 with a water reservoir of 70 million m3. Thika River also supplies water to Masinga Reservoir to supply the seven forks dams, which together supply 75% of the nation's electricity. The quantity of water in rivers and reservoirs is decreased due to sedimentation while water quality is degraded by sediments, and sediment-borne nutrients and pesticides. The focus of this pilot twinning project is watershed erosion and reservoir sedimentation assessment. This will be accomplished by (1) a rapid watershed/catchment erosion assessment using ground based measurements and remote sensing/GIS techniques, 2) use of Acoustic Profiling Systems (APS) for reservoir sedimentation measurement studies, and 3) advanced water quality modeling using the soil and water assessment tool (SWAT) model. Data acquired will be used for sediment transport modeling to1) determine sediment "hot spots" and management practices that will minimize sediments into reservoirs in order to 2) maintain the reservoirs on which many farmers depend for their livelihood and a cleaner environment. This project will provide an opportunity for 1) sharing knowledge and experience among the stakeholders, 2) building capacity through formal and informal education opportunities through reciprocal hosting of decision makers and water experts, and 3) technology transfer of pilot results with recommended management practices to reduce reservoir sedimentation rates.

  1. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  2. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  3. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  4. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  5. National Grid Deep Energy Retrofit Pilot

    Energy Technology Data Exchange (ETDEWEB)

    Neuhauser, K.

    2012-03-01

    Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wider adoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gauge long-term energy performance, durability, and occupant comfort.

  6. Project baselines and boundaries for project-based GHG emission reduction trading : a report to the Greenhouse Gas Emission Trading Pilot Program

    Energy Technology Data Exchange (ETDEWEB)

    Lazarus, M.; Kartha, S.; Bernow, S. [Tellus Inst., Boston, MA (United States)

    2001-04-01

    One of the great challenges for policy makers in the twenty first century is turning out to be global climate change caused by greenhouse gas emissions. Recent setbacks in international negotiations do not preclude the imposition of national emission targets. One option being studied to increase the economic efficiency of meeting these targets is the creation of emissions trading markets. The exploration of credit trading in the field of greenhouse gas emissions is carried out under the banner of the Greenhouse Gas Emission Reduction Trading (GERT) Pilot Project. One of its objectives is the development of the institutional framework required for the Clean Development Mechanism (CDM), Joint Implementation (JI), and other international credit trading programs. To ensure credits are awarded to projects in a fair and transparent manner, technical, methodological, and administrative processes must be put in place. The determination of project baselines and project boundaries represent two of the main challenges confronting policy makers in awarding the credits. A review of baseline and boundary methods was initiated by GERT, and this report also contains a description of the main advantages and drawbacks of the various methods being considered. Lessons learned and opportunities are especially important for GERT to provide proper guidance to developers. The context and rationale for baselines and boundary setting are first explored in this report, as well as the issues of importance, and common criteria for the evaluation of alternative methods. The principal options for baseline determination, advantages and disadvantages, and applicability in various contexts were reviewed in section 2. The topic of avoided electricity use, and how to set consistent baselines for it are discussed in section 3. Project boundary is the topic of section 4, including leakage, upstream and downstream emissions, rebound and positive spillover effects, and means by which these issues can de

  7. [Social media: forum webcare as a proactive information strategy in health promotion: Results of a pilot project by the BZgA].

    Science.gov (United States)

    Quast, T; Nöcker, Guido

    2015-09-01

    Over several weeks in 2013, the BZgA pilot project "SoMe" (August 2012 to February 2014) tested and investigated various social media interventions in the fields of family planning and sex education. The interventions included the tool "forum webcare," which was used in four forums for pregnant women and three for young people. The term webcare originally described a customer-oriented communication strategy of the web economy. The term includes elements of reputation management, customer care, and online marketing. In the present pilot project, forum webcare has been understood and applied in the sense of "virtual street work," which means that issues on health topics in non-self-operated forums were identified and answered. The design was based on the Precede-Proceed Model. In the phases of analysis, implementation, and evaluation the project used chronologically and methodologically interlaced and mutually controlling methods such as online test groups, intensive interviews, and the evaluation of data on web use. The analysis indicated that the target groups of the project used the forums quite often; that they had a positive attitude toward the idea of webcare providing contributions from experts working for public institutions; and that the risk of reactance was low. Forum webcare allows important supplementary and well-founded information to be brought into the discussions. At the same time the results of the project show that users, when keeping to certain rules, mostly see webcare as a welcome addition to incomplete information and the improvement of faulty information, and appreciate it as quality enhancement for the forum. From the view of the information provider, forum webcare is more a chance to address numerous passive recipients rather than communicating with single users. At the same time the instrument provides the chance to learn from users of the forums, and to become familiar with and be able to respond to their needs and the way in which they

  8. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    Science.gov (United States)

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  9. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  10. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    Science.gov (United States)

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  11. Active pulmonary tuberculosis case detection and treatment among floating population in China: an effective pilot.

    Science.gov (United States)

    Li, Xinxu; Zhang, Hui; Jiang, Shiwen; Wang, Jia; Liu, Xiaoqiu; Li, Weibin; Yao, Hongyan; Wang, Lixia

    2010-12-01

    China has more and more floating population because of reform and opening-up. As one of the high burden countries in tuberculosis (TB) control in the world, China has to face more challenges about the TB case detection and treatment among floating population in China. Aim to evaluate the effect of case detection and treatment of the Floating Population TB Control Pilot Project from Global Fund Round Five (GFR5) TB Control Program in China. During October 2006 to September 2008, the pilot project was implemented gradually in 60 counties in Tianjin, Shanghai, Jiangsu, Zhejiang, Fujian, Shandong and Guangdong. All quarterly reports of the pilot project were collected, and these materials were summarized and analyzed. In seven coastal provinces, 19,584 active pulmonary TB (PTB) cases were registered among floating population in 2 years. Among the active PTB cases, 87.2% were 15-45 years old, and 62.8% were male. In second year, 15,629 active PTB cases were registered, and the overall registration rate was 68 per 100,000 people. DOT treatments were provided for 18,125 active PTB cases in 2 years, and overall DOT treatment rate was 92.6%. There were 3,955 active PTB cases registered in first year, and the overall cure rate was 86.0%. Through the implementation of the pilot project, the TB case detection and treatment among floating population have been enhanced in pilot areas of China. The useful experience and results from the pilot project have been being gradually generalized nationally.

  12. Ballroom dancing as physical activity for patients with cancer: a systematic review and report of a pilot project.

    Science.gov (United States)

    Rudolph, Ivonne; Schmidt, Thorsten; Wozniak, Tobias; Kubin, Thomas; Ruetters, Dana; Huebner, Jutta

    2018-04-01

    Physical activity has positive effects on cancer patients. Dancing addresses diverse bio-psycho-social aspects. Our aim was to assess the evidence on ballroom dancing and to develop the setting for a pilot project. We performed a systematic review, extracted the data and designed a pilot training based on standard curricula. We included cancer patients during or after therapy. Training duration was 90 min with one regular pause and individual pauses as needed. We retrieved two systematic reviews and six controlled studies. Types of dancing varied. Only one study used ballroom dancing. Dance training might improve well-being, physical fitness, fatigue and coping during and after therapy. Yet, evidence is scarce and data to derive the effect size are lacking; 27 patients and their partners took part in the pilot training. Patients and partners needed more time to learn the steps than is planned in regular ballroom classes. Participants were very satisfied with the adaptation of the training to their physical strength and estimated the training in a sheltered group. No side effects occurred. In spite of a high rate of participants reporting fatigue, 90 min of physical activity with only a few minutes of rest were manageable for all participants. Ballroom dancing may offer benefits for patients with respect to quality of life. Cancer patients prefer sheltered training setting and curricula of regular ballroom classes must be adapted for cancer patients. Strict curricula might reduce motivation and adherence and exclude patients with lower or variable fitness.

  13. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  14. Reports on 1977 result of research. Investigation for selecting site location of pilot plant for 7,000Nm{sup 3}/day class high calorie gasification; 1977 nendo sunshine keikaku ni kakawaru plant kenkyu kaihatsu seika hokoku. 7,000Nm{sup 3}/nichi kyu kokarori gas ka pilot plant yochi no ricchi sentei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-20

    A report was made on the result of investigation for selecting a suitable site for a coal gasification pilot plant. The high calorie gasification plant under the Sunshine Project is scheduled to have a parallel operation of two methods. It could be decided on one only method depending on the future studies. One is the 'water gasification method' using coal only as the raw material, with hydrogen gas added to contrive methanization. The other is the 'hybrid gasification method' using mixed slurry of powdered coal and heavy oil as the raw material, with oxygen supplied to it to form a clean gas. The sites proposed for the pilot plant are the cities of Yubari, Iwaki, Kita-Ibaraki, Tagawa, Iizuka and Imari. The items for assessment of cost effectiveness are the expenses of development of a site, road construction, removal of existing obstacles, plant construction, power receiving equipment construction, irrigation supply facilities construction, wastewater treatment system construction, ash discharging system construction, transportation, and supply/processing-related maintenance. As a result of the assessment, Iwaki city was picked up as the area almost free from drawbacks to cost effectiveness. (NEDO)

  15. Reports on 1977 result of research. Investigation for selecting site location of pilot plant for 7,000Nm{sup 3}/day class high calorie gasification; 1977 nendo sunshine keikaku ni kakawaru plant kenkyu kaihatsu seika hokoku. 7,000Nm{sup 3}/nichi kyu kokarori gas ka pilot plant yochi no ricchi sentei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-20

    A report was made on the result of investigation for selecting a suitable site for a coal gasification pilot plant. The high calorie gasification plant under the Sunshine Project is scheduled to have a parallel operation of two methods. It could be decided on one only method depending on the future studies. One is the 'water gasification method' using coal only as the raw material, with hydrogen gas added to contrive methanization. The other is the 'hybrid gasification method' using mixed slurry of powdered coal and heavy oil as the raw material, with oxygen supplied to it to form a clean gas. The sites proposed for the pilot plant are the cities of Yubari, Iwaki, Kita-Ibaraki, Tagawa, Iizuka and Imari. The items for assessment of cost effectiveness are the expenses of development of a site, road construction, removal of existing obstacles, plant construction, power receiving equipment construction, irrigation supply facilities construction, wastewater treatment system construction, ash discharging system construction, transportation, and supply/processing-related maintenance. As a result of the assessment, Iwaki city was picked up as the area almost free from drawbacks to cost effectiveness. (NEDO)

  16. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  17. Priming a Pilot Implementation

    DEFF Research Database (Denmark)

    Hansen, Magnus; Ie Pedersen, Maria

    Abstract. We report on the initial findings of an action research study about effects specifications. It is a part of larger IS pilot implementation project conducted in the Danish healthcare sector. Through interviews and a workshop we have identified and specified the main effects that comprise...... the basis for the evaluation of the project. The study indicates that cross-organisational effects specifications cause a significant number of effects. To further prioritize these we argue that both interview and workshop must be facilitated as mutual learning processes between interviewer and interviewee....

  18. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  19. Nucleus: A pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Finnell, Joshua Eugene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Martin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Cain, Brian J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-09

    The proposal is to provide institutional infrastructure that facilitates management of research projects, research collaboration, and management, preservation, and discovery of data. Deploying such infrastructure will amplify the effectiveness, efficiency, and impact of research, as well as assist researchers in regards to compliance with both data management mandates and LANL security policy. This will facilitate discoverability of LANL research both within the lab and external to LANL.

  20. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    International Nuclear Information System (INIS)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb; Jacqueline G. Broder

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completed and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed

  1. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  2. Guidebook on design, construction and operation of pilot plants for uranium ore processing

    International Nuclear Information System (INIS)

    1990-01-01

    The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. 42 refs, 7 figs, 3 tabs

  3. PULSE Pilot Certification Results

    Directory of Open Access Journals (Sweden)

    Pamela Pape-Lindstrom

    2015-08-01

    Full Text Available The pilot certification process is an ambitious, nationwide endeavor designed to motivate important changes in life sciences education that are in line with the recommendations of the 2011 Vision and Change Report: A Call to Action (American Association for the Advancement of Science [AAAS], 2011.  It is the goal of the certification process to acknowledge departments that have progressed towards full implementation of the tenets of Vision and Change and to motivate departments that have not begun to adopt the recommendations to consider doing so.  More than 70 life science departments applied to be part of the pilot certification process, funded by a National Science Foundation grant, and eight were selected based on initial evidence of transformed and innovative educational practices.  The programs chosen represent a wide variety of schools, including two-year colleges, liberal-arts institutions, regional comprehensive colleges, research universities and minority serving institutions.  Outcomes from this pilot were released June 1, 2015 (www.pulsecommunity.org, with all eight programs being recognized as having progressed along a continuum of change.  Five levels of achievement were defined as PULSE Pilot Progression Levels.  Of the eight departments in the pilot, one achieved “PULSE Progression Level III: Accomplished”.  Six departments achieved “PULSE Progression Level II: Developing” and one pilot department achieved “PULSE Progression Level I: Beginning”.  All of the schools have made significant movement towards the recommendations of Vision and Change relative to a traditional life sciences curriculum.  Overall, the response from the eight pilot schools has been positive. 

  4. Studying on design of a complete pilot plant for processing sandstone ores in Pa Lua-Pa Rong area

    International Nuclear Information System (INIS)

    Le Quang Thai; Tran Van Son; Vu Khac Tuan; Tran The Dinh; Trinh Nguyen Quynh; Doan Thi Mo; Nguyen Hong Ha; Bui Thi Bay; Pham Minh Tuan; Than Van Lien

    2015-01-01

    Design, construction and operation of a pilot for processing uranium containing ores are important stages in the process of project development of uranium production from ores because uranium contained minerals and the composition of minerals are unstable factors. In this case, pilot needs to be a simulation of a plant in the future, but with upgrade equipment compared that at laboratory scale. Results of lab research were used to select the most appropriate process for ore processing and selection of equipment for each stages. In the circumstance when there has been a lack of experience in processing uranium ores in Vietnam, the design and construction of such a pilot with completed technological procedures are essential. The main purpose of this work is to verify results of lab researches and optimize operational parameters of the process. In addition, several purposes were also considered such as study on the effects of solution circulation/recycling and accumulation of impurities in a long run; obtain necessary and sufficient information for design, cost estimate for investment and operation. The pilot only can achieve the expected objectives when ore sources (including reserves and characteristics) are determined; a complete technological process for obtaining technical uranium (yellowcake) is designed; investment and operational capitals are estimated and these estimates show the costs and benefits of the process. In this article, the authors will focus on the presentation of research results, including data on ore, process technology, material balance, pilot scale, the basic parameters of equipment, installation diagram of equipment, construction, power and water needs identification, preliminary calculation of investment and operational costs. (author)

  5. Risk assessment of chemicals in foundries: The International Chemical Toolkit pilot-project

    International Nuclear Information System (INIS)

    Ribeiro, Marcela G.; Filho, Walter R.P.

    2006-01-01

    In Brazil, problems regarding protection from hazardous substances in small-sized enterprises are similar to those observed in many other countries. Looking for a simple tool to assess and control such exposures, FUNDACENTRO has started in 2005 a pilot-project to implement the International Chemical Control Toolkit. During the series of visits to foundries, it was observed that although many changes have occurred in foundry technology, occupational exposures to silica dust and metal fumes continue to occur, due to a lack of perception of occupational exposure in the work environment. After introducing the Chemical Toolkit concept to the foundry work group, it was possible to show that the activities undertaken to improve the management of chemicals, according to its concept, will support companies in fulfilling government legislations related to chemical management, occupational health and safety, and environmental impact. In the following meetings, the foundry work group and FUNDACENTRO research team will identify 'inadequate work situations'. Based on the Chemical Toolkit, improvement measures will be proposed. Afterwards, a survey will verify the efficency of those measures in the control of hazards and consequently on the management of chemicals. This step is now in course

  6. Sibanye Methods for Prevention Packages Program Project Protocol: Pilot Study of HIV Prevention Interventions for Men Who Have Sex With Men in South Africa.

    Science.gov (United States)

    McNaghten, Ad; Kearns, Rachel; Siegler, Aaron J; Phaswana-Mafuya, Nancy; Bekker, Linda-Gail; Stephenson, Rob; Baral, Stefan D; Brookmeyer, Ron; Yah, Clarence S; Lambert, Andrew J; Brown, Benjamin; Rosenberg, Eli; Blalock Tharp, Mondie; de Voux, Alex; Beyrer, Chris; Sullivan, Patrick S

    2014-10-16

    Human immunodeficiency virus (HIV) prevention intervention programs and related research for men who have sex with men (MSM) in the southern African region remain limited, despite the emergence of a severe epidemic among this group. With a lack of understanding of their social and sexual lives and HIV risks, and with MSM being a hidden and stigmatized group in the region, optimized HIV prevention packages for southern African MSM are an urgent public health and research priority. The objective of the Sibanye Health Project is to develop and evaluate a combination package of biomedical, behavioral, and community-level HIV prevention interventions and services for MSM in South Africa. The project consists of three phases: (1) a comprehensive literature review and summary of current HIV prevention interventions (Phase I), (2) agent-based mathematical modeling of HIV transmission in southern African MSM (Phase II), and (3) formative and stigma-related qualitative research, community engagement, training on providing health care to MSM, and the pilot study (Phase III). The pilot study is a prospective one-year study of 200 men in Cape Town and Port Elizabeth, South Africa. The study will assess a package of HIV prevention services, including condom and condom-compatible lubricant choices, risk-reduction counseling, couples HIV testing and counseling, pre-exposure prophylaxis (PrEP) for eligible men, and non-occupational post-exposure prophylaxis for men with a high risk exposure. The pilot study will begin in October 2014. Preliminary results from all components but the pilot study are available. We developed a literature review database with meta-data extracted from 3800 documents from 67 countries. Modeling results indicate that regular HIV testing and promotion of condom use can significantly impact new HIV infections among South African MSM, even in the context of high coverage of early treatment of HIV-positive men and high coverage of PrEP for at-risk HIV

  7. Development and pilot testing of 24/7 in-ambulance telemedicine for acute stroke : prehospital stroke study at the Universitair Ziekenhuis Brussel-project

    OpenAIRE

    Espinoza, Alexis Valenzuela; Van Hooff, Robbert-Jan; De Smedt, Ann; Moens, Maarten; Yperzeele, Laetitia; Nieboer, Koenraad; Hubloue, Ives; de Keyser, Jacques; Convents, Andre; Tellez, Helio Fernandez; Dupont, Alain; Putman, Koen; Brouns, Raf

    2016-01-01

    Abstract: Background: In-ambulance telemedicine is a recently developed and a promising approach to improve emergency care. We implemented the first ever 24/7 in-ambulance telemedicine service for acute stroke. We report on our experiences with the development and pilot testing of the Prehospital Stroke Study at the Universitair Ziekenhuis Brussel (PreSSUB) to facilitate a wider spread of the knowledge regarding this technique. Methods: Successful execution of the project involved the develop...

  8. Development and Pilot Testing of 24/7 In-Ambulance Telemedicine for Acute Stroke: Prehospital Stroke Study at the Universitair Ziekenhuis Brussel-Project

    OpenAIRE

    Espinoza, Alexis Valenzuela; Van Hooff, Robbert-Jan; De Smedt, Ann; Moens, Maarten; Yperzeele, Laetitia; Nieboer, Koenraad; Hubloue, Ives; de Keyser, Jacques; Convents, Andre; Tellez, Helio Fernandez; Dupont, Alain; Putman, Koen; Brouns, Raf

    2016-01-01

    Background: In-ambulance telemedicine is a recently developed and a promising approach to improve emergency care. We implemented the first ever 24/7 in-ambulance telemedicine service for acute stroke. We report on our experiences with the development and pilot testing of the Prehospital Stroke Study at the Universitair Ziekenhuis Brussel (PreSSUB) to facilitate a wider spread of the knowledge regarding this technique. Methods: Successful execution of the project involved the development and v...

  9. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  10. Final Report on SSD2 pilot results in Denmark

    DEFF Research Database (Denmark)

    Andersen, Jens Hinge; Jørgensen, Kevin; Jensen, Louise Grønhøj Hørbye

    This document is the “Report on SSD2 pilot results” of the project OC/EFSA/DCM/2013/05: “Pilot project on the implementation of SSD2 in the frame of the electronic transmission of harmonised data collection of analytical results to EFSA”. The report includes a description of the software and tools...... used, a description of the challenges encountered in migrating data structure from SSD1/XML to SSD2 in the national data repositories, a summary of the experience gained in testing SSD2 and recommendations for EFSA on effectiveness and suitability of the SSD2 in the different domains. The following...

  11. Pilot projects and nation-wide immunization in India.

    Science.gov (United States)

    Haxton, D

    1984-01-01

    These studies identify possibilities for expanding immunization coverage in India and show that there have been positive experiences in going to scale with immunizationation at the district level. Reasons for success are discussed. The promotion of social awareness and participation through all available channels is of central importance. Continuing attention should be directed to vaccine supply and distribution systems, program management and manpower training, especially at the community level. There are many opportunities for extending involvement in immunization efforts and broad-spectrum programs beyond the confines of the health system, and for flexibility in program organization. Planning must incorporate political commitment as well as the provision of adequate financial resources. India launched the Expanded Program on Immunization (EPI) in 1978. 6 diseases are currently on the official schedule for progressive nation-wide immunization: tuberculosis, poliomyelitis, whooping cough, diptheria, tetanus and typhoid. The experiences of 3 efforts in Dewas, in Bidar, (2 rural areas), and in Delhi (an urban area) are covered. Immunization coverage before the intensive efforts did not exceed 30%. Major elements of program organization were: nonhealth sector political and administrative involvement from the state; multisectoral planning committees at different levels; household surveys to identify children to be immunized; training sessions for each category of workers; and strengthening the cold chain. Factors in operational design and implementation include: vaccination posts in the community; selection of acceptable vaccination days; reminders the day before vaccination; collection of children; immunization cards as a device for informing about next round; counteraction of side-effects; follow-up of drop-outs; monitoring for corrective action involving all participants; and formal evaluation by local medical colleges. Intensive immunization in the 3 pilot sites

  12. Namibian Flood Early Warning SensorWeb Pilot

    Science.gov (United States)

    Mandl, Daniel; Policelli, Fritz; Frye, Stuart; Cappelare, Pat; Langenhove, Guido Van; Szarzynski, Joerg; Sohlberg, Rob

    2010-01-01

    The major goal of the Namibia SensorWeb Pilot Project is a scientifically sound, operational trans-boundary flood management decision support system for Southern African region to provide useful flood and waterborne disease forecasting tools for local decision makers. The Pilot Project established under the auspices of: Namibian Ministry of Agriculture Water and Forestry (MAWF), Department of Water Affairs; Committee on Earth Observing Satellites (CEOS), Working Group on Information Systems and Services (WGISS); and moderated by the United Nations Platform for Space-based Information for Disaster Management and Emergency Response (UN-SPIDER). The effort consists of identifying and prototyping technology which enables the rapid gathering and dissemination of both space-based and ground sensor data and data products for the purpose of flood disaster management and water-borne disease management.

  13. Breast cancer and personal environmental risk factors in Marin County - Pilot study

    Energy Technology Data Exchange (ETDEWEB)

    Erdmann, C.A.; Farren, G.; Baltzell, K.; Chew, T.; Clarkson, C.; Fleshman, R.; Leary, C.; Mizroch, M.; Orenstein, F.; Russell, M.L.; Souders-Mason, V.; Wrensch, M.

    2003-02-01

    The purpose of the Personal Environmental Risk Factor Study (PERFS) pilot project was to develop methodologies and a questionnaire for a future population-based case-control study to investigate the role of selected environmental exposures in breast cancer development. Identification of etiologically relevant exposures during a period of potential vulnerability proximate to disease onset offers the possibility of clinical disease prevention even when disease initiation may have already occurred many years earlier. Certain personal environmental agents or combinations of agents may influence disease promotion. Therefore, this pilot study focused on exposures that occurred during the ten-year period prior to diagnosis for cases and the last ten years for controls, rather than more historic exposures. For this pilot study, they used a community-based research approach. In the collaborative efforts, community members participated with academic researchers in all phases of the research, including research question identification, study design, development of research tools, development of the human subjects protocol, and report writing. Community member inclusion was based upon the concept that community participation could improve the relevance of scientific studies and ultimate success of the research by encouraging an ongoing dialogue between community members and academic representatives. Early activities of this project focused on the collection of input from the community regarding the possible role of environmental factors in the incidence of breast cancer in Marin County. The intent was to inform the scientists of community concerns, enhance the research team's understanding of the community being studied, and provide interested community members with a better understanding of the strengths and weaknesses of traditional research methods through active participation in the research process.

  14. The James Webb STEM Innovation Project: Bringing JWST to the Education Community

    Science.gov (United States)

    Eisenhamer, Bonnie; Harris, J.; Ryer, H.; Taylor, J.; Bishop, M.

    2012-01-01

    Building awareness of a NASA mission prior to launch and connecting that mission to the education community can be challenging. In order to address this challenge, the Space Telescope Science Institute's Office of Public Outreach has developed the James Webb STEM innovation Project (SIP) - an interdisciplinary project that focuses on the engineering aspects and potential scientific discoveries of JWST, while incorporating elements of project-based learning. Students in participating schools will use skills from multiple subject areas to research an aspect of the JWST's design or potential science and create models, illustrated essays, or technology-based projects to demonstrate their learning. Student projects will be showcased during special events at select venues in the project states - thus allowing parents and community members to also be benefactors of the project. Currently, the SIP is being piloted in New York, California, and Maryland. In addition, we will be implementing the SIP in partnership with NASA Explorer Schools in the states of New Mexico, Michigan, Texas, Tennessee, and Iowa.

  15. Electronic medical file exchange between on-duty care providers and the attending paediatrician: a Belgian paediatric pilot project.

    Science.gov (United States)

    Deneyer, M; Hachimi-Idrissi, S; Michel, L; Nyssen, M; De Moor, G; Vandenplas, Y

    2012-01-01

    The authors propose the introduction of a pilot project: "paediatric core file exchange in emergencies" (PCF-EXEM) which enables the exchange of medical data between the attending paediatrician (AP), holder of the medical record, and on-duty medical units (i.e. general practitioners, paediatricians, surgeons, emergency physicians,...). This project is based on two pillars: a protected server (PCF-server) containing paediatric core files (PCF), with important clinical data that should be available for the physician in order to quickly get a clear insight into the relevant clinical medical history of the child, and secondly, the possibility to provide feedback to the attending physician about the findings recorded during the on-call duty. The permanent availability of health data on the PCF-server and the possibility to provide feedback represent together the PCF-EXEM-project. This project meets the demand of the care providers to have relevant medical information permanently available in order to guarantee high quality care in emergency situations. The frail balance between the right to informative privacy and professional confidentiality on the one hand and the right to quality health care on the other hand has been taken into account. The technical and practical feasibility of this project is described. The objectives and vision of the PCF-EXEM project are conform to Belgian legislation concerning the processing of medical data and are in line with the still under consideration European projects which are focusing on interoperability and the development of a common access control to databanks containing health data for care providers. PCF-EXEM could therefore be a model for other EU countries as well.

  16. Use of a virtual world computer environment for international distance education: lessons from a pilot project using Second Life.

    Science.gov (United States)

    Schoonheim, Marloes; Heyden, Robin; Wiecha, John M

    2014-02-21

    Virtual worlds (VWs), in which participants navigate as avatars through three-dimensional, computer-generated, realistic-looking environments, are emerging as important new technologies for distance health education. However, there is relatively little documented experience using VWs for international healthcare training. The Geneva Foundation for Medical Education and Research (GFMER) conducted a VW training for healthcare professionals enrolled in a GFMER training course. This paper describes the development, delivery, and results of a pilot project undertaken to explore the potential of VWs as an environment for distance healthcare education for an international audience that has generally limited access to conventionally delivered education.

  17. Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

    Science.gov (United States)

    This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I.

  18. RandAgiamo™, a Pilot Project Increasing Adoptability of Shelter Dogs in the Umbria Region (Italy).

    Science.gov (United States)

    Menchetti, Laura; Mancini, Stefania; Catalani, Maria Chiara; Boccini, Beatrice; Diverio, Silvana

    2015-08-14

    Current Italian legislation does not permit euthanasia of dogs, unless they are ill or dangerous. Despite good intentions and ethical benefits, this 'no-kill policy' has caused a progressive overpopulation of dogs in shelters, due to abandonment rates being higher than adoption rates. Shelter overcrowding has negative implications for dog welfare and increases public costs. The aim of this paper is to describe the pilot project "RandAgiamo" implemented in a rescue shelter in the Umbria Region and to evaluate its effectiveness on the rate of dog adoption using official data. RandAgiamo aimed to increase adult shelter dogs' adoptability by a standard training and socialization programme. It also promoted dogs' visibility by publicizing them through social media and participation in events. We analysed the official data of the Umbria regional health authorities regarding dog shelters of the Perugia province of the year 2014. In the RandAgiamo shelter, the dog adoption rate was 27.5% higher than that of dogs housed in other shelters located in the same geographical area (P < 0.001). The RandAgiamo project could be beneficial for the dogs' welfare, owner satisfaction, shelter management, and public perception of shelter dogs. However, staff were required to provide dog training and related activities.

  19. RandAgiamo™, a Pilot Project Increasing Adoptability of Shelter Dogs in the Umbria Region (Italy

    Directory of Open Access Journals (Sweden)

    Laura Menchetti

    2015-08-01

    Full Text Available Current Italian legislation does not permit euthanasia of dogs, unless they are ill or dangerous. Despite good intentions and ethical benefits, this ‘no-kill policy’ has caused a progressive overpopulation of dogs in shelters, due to abandonment rates being higher than adoption rates. Shelter overcrowding has negative implications for dog welfare and increases public costs. The aim of this paper is to describe the pilot project “RandAgiamo” implemented in a rescue shelter in the Umbria Region and to evaluate its effectiveness on the rate of dog adoption using official data. RandAgiamo aimed to increase adult shelter dogs’ adoptability by a standard training and socialization programme. It also promoted dogs’ visibility by publicizing them through social media and participation in events. We analysed the official data of the Umbria regional health authorities regarding dog shelters of the Perugia province of the year 2014. In the RandAgiamo shelter, the dog adoption rate was 27.5% higher than that of dogs housed in other shelters located in the same geographical area (P < 0.001. The RandAgiamo project could be beneficial for the dogs’ welfare, owner satisfaction, shelter management, and public perception of shelter dogs. However, staff were required to provide dog training and related activities.

  20. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  1. Waste minimization and pollution prevention technology transfer : the Airlie House Projects

    International Nuclear Information System (INIS)

    Gatrone, R.; McHenry, J.; Myron, H.; Thout, J. R.

    1998-01-01

    The Airlie House Pollution Prevention Technology Transfer Projects were a series of pilot projects developed for the US Department of Energy with the intention of transferring pollution prevention technology to the private sector. The concept was to develop small technology transfer initiatives in partnership with the private sector. Argonne National Laboratory developed three projects: the microscale chemistry in education project, the microscale cost benefit study project, and the Bethel New Life recycling trainee project. The two microscale chemistry projects focused on introducing microscale chemistry technologies to secondary and college education. These programs were inexpensive to develop and received excellent evaluations from participants and regulators. The Bethel New Life recycling trainee project provided training for two participants who helped identify recycling and source reduction opportunities in Argonne National Laboratory's solid waste stream. The pilot projects demonstrated that technology transfer initiatives can be developed and implemented with a small budget and within a short period of time. The essential components of the pilot projects were identifying target technologies that were already available, identifying target audiences, and focusing on achieving a limited but defined objective

  2. SELECTION OF PROJECT MANAGERS IN CONSTRUCTION FIRMS USING ANALYTIC HIERARCHY PROCESS (AHP AND FUZZY TOPSIS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Fatemeh Torfi

    2011-10-01

    Full Text Available Selecting a project manager is a major decision for every construction company. Traditionally, a project manager is selected by interviewing applicants and evaluating their capabilities by considering the special requirements of the project. The interviews are usually conducted by senior managers, and the selection of the best candidate depends on their opinions. Thus, the results may not be completely reliable. Moreover, conducting interviews for a large group of candidates is time-consuming. Thus, there is a need for computational models that can be used to select the most suitable applicant, given the project specifications and the applicants’ details. In this paper, a case study is performed in which a Fuzzy Multiple Criteria Decision Making (FMCDM model is used to select the best candidate for the post of project manager in a large construction firm. First, with the opinions of the senior managers, all the criteria and sub-criteria required for the selection are gathered, and the criteria priorities are qualitatively specified. Then, the applicants are ranked using the Analytic Hierarchy Process (AHP, approximate weights of the criteria, and fuzzy technique for order performance by similarity to ideal solution (TOPSIS. The results of the case study are shown to be satisfactory.

  3. NHS Blood Tracking Pilot: City University Evaluation Project

    Science.gov (United States)

    Goddard, Kate; Shabestari, Omid; Adriano, Juan; Kay, Jonathan; Roudsari, Abdul

    Automation of healthcare processes is an emergent theme in the drive to increase patient safety. The Mayday Hospital has been chosen as the pilot site for the implementation of the Electronic Clinical Transfusion Management System to track blood from the point of ordering to the final transfusion. The Centre for Health Informatics at City University is carrying out an independent evaluation of the system implementation using a variety of methodologies to both formatively inform the implementation process and summatively provide an account of the lessons learned for future implementations.

  4. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  5. Network Insights for Partner Selection in Inter-Organisational New Product Development Projects

    DEFF Research Database (Denmark)

    Ruiz, Pedro Parraguez; Maier, Anja

    2016-01-01

    Selecting partners for new product development (NPD) is an important yet under-supported task. Thispaper focuses on decision-making support for the NPD collaboration stages of partner exploration andsearch. We provide a conceptual framework for a network-based platform to identify potential......: technologicalcloseness, relational closeness, geographical closeness and a set of organisational variables. In order toidentify a subset of new product development partners and aid the selection process, three characteristicsof NPD projects are considered as mediators of those success factors: the desired degree...... and illustrate with examples the networkbasedplatform to explore NPD partners. The developed framework and platform are part of Net-Sights,an ongoing research project to develop open-source decision-support tools for network insights. Thefirst version of this tool will soon be available as an online platform...

  6. Wastewater planning in Djenné, Mali. A pilot project for the local infiltration of domestic wastewater.

    Science.gov (United States)

    Alderlieste, M C; Langeveld, J G

    2005-01-01

    The city of Djenné (Mali) is famous for its mosque which is the world's largest adobe building. Djenné is considered to be one of the most interesting cities in Western Africa from an architectural point of view. Since 1988, Djenné is listed as a UNESCO World Heritage Site. In the 1990s, a drinking water supply network was provided by foreign development organisations. However, no facilities were provided for the disposal of wastewater, resulting in an increase of waterborne diseases. This paper describes the urban drainage problem in Djenné and discusses the systematic evaluation of possible solutions and the subsequent pilot project for the local infiltration of sullage. The infiltration of sullage proved to be an appropriate technology for solving the urban drainage problem in Djenné.

  7. Applications of pilot scanning behavior to integrated display research

    Science.gov (United States)

    Waller, M. C.

    1977-01-01

    The oculometer is an electrooptical device designed to measure pilot scanning behavior during instrument approaches and landing operations. An overview of some results from a simulation study is presented to illustrate how information from the oculometer installed in a visual motion simulator, combined with measures of performance and control input data, can provide insight into the behavior and tactics of individual pilots during instrument approaches. Differences in measured behavior of the pilot subjects are pointed out; these differences become apparent in the way the pilots distribute their visual attention, in the amount of control activity, and in selected performance measures. Some of these measured differences have diagnostic implications, suggesting the use of the oculometer along with performance measures as a pilot training tool.

  8. Samba for solar modules. Brazil decides reimbursement strategy and starts pilot projects; Samba fuer Solarmodule. Brasilien macht den Weg fuer die Einspeisung von Solarstrom frei und startet Pilotprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Rosell, Alejandro Diego

    2012-06-15

    Better late than never: After long years of discussion, Brazil recently decided on a reimbursement strategy. Further, pilot projects with a total of 24 MW are in te planning stage. While some expect a major invitation for tender, local experts warn of rough times ahead.

  9. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  10. Handbook of selected organ doses for projections common in pediatric radiology

    International Nuclear Information System (INIS)

    Rosenstein, M.; Beck, T.J.; Warner, G.G.

    1979-05-01

    This handbook contains data from which absorbed dose (mrad) to selected organs can be estimated for common projections in pediatric radiology. The organ doses are for three reference patients: a newborn (0 to 6 months), a 1-year old child, and a 5-year old child. One intent of the handbook is to permit the user to evaluate the effect on organ dose to these reference pediatric patients as a function of certain changes in technical parameters used in or among facilities. A second intent is to permit a comparison to be made of organ doses as a function of age. This comparison can be extended to a reference adult by referring to the previous Handbook of Selected Organ Doses fo Projections Common in Diagnostic Radiology, FDA 76-8031. Assignment of organ doses to individual pediatric patients using the Handbook data is not recommended unless the physical characteristics of the patient closely correlate with one of the three reference pediatric patients given in Appendix A

  11. Capacity Development and Strengthening for Energy Policy formulation and implementation of Sustainable Energy Projects in Indonesia CASINDO. Deliverable No. 16. Development and execution of pilot research projects at the CASINDO partner universities

    Energy Technology Data Exchange (ETDEWEB)

    Wijnker, M. [Eindhoven University of Technology TUE, Eindhoven (Netherlands)

    2011-09-15

    The overall objective of the CASINDO programme is to establish a self-sustaining and self-developing structure at both the national and regional level to build and strengthen human capacity to enable the provinces of North Sumatra, Yogyakarta, Central Java, West Nusa Tenggara and Papua to formulate sound policies for renewable energy and energy efficiency and to develop and implement sustainable energy projects. Each of the five Indonesian universities managed to develop pilot research projects and wrote research proposals to outline and strengthen their ideas. All of the universities also purchased equipment for the purpose of executing this research. UNCEN (Cenderawasih University, Jayapura, Papua, Indonesia) and UNDIP (Diponegoro University in Semarang, Java, Indonesia) managed to finalize their research within the project period and wrote reports on their results. The other universities could not yet present results due to delay in one or several of the steps within the procedure.

  12. The Montbeliard Radiation Protection Pilot Project: a global approach of radiation protection addressing occupational, public and patient exposures at the level of a large urban community

    International Nuclear Information System (INIS)

    Schieber, Caroline; Lochard, Jacques; Badajoz, Coralie; Bataille, Celine; Croueail, Pascal; Klein, Didier; Klopfenstein, Jean-Francois; Makovicka, Libor

    2008-01-01

    The Montbeliard Radiation Protection Pilot Project started in March 2004, at the initiative of the Inter- City Council of the Montbeliard Country in cooperation with CEPN. It aims at improving the radiation protection of the inhabitants of the Montbeliard Country in the various exposure situations which can be potentially encountered on the territory (hospital, dwellings, environment,...) as well as at promoting the creation of a pole of competence in the field of radiation protection in the Montbeliard Country. The project relies on the involvement of all relevant stakeholders at the local, national and international level. This paper provides with a quick insight of the project organisation, followed by a synthetic description of the main achievements of the various project areas. (author)

  13. DEMETERRES project: development of innovative technologies for removing radionuclides from contaminated solid and liquid matrices

    Science.gov (United States)

    Chagvardieff, Pierre; Barré, Yves; Blin, Virginie; Faure, Sylvain; Fornier, Anne; Grange, Didier; Grandjean, Agnès; Guiderdoni, Emmanuel; Henner, Pascale; Siroux, Brice; Leybros, Antoine; Messalier, Marc; Paillard, Hervé; Prévost, Thierry; Rennesson, Malvina; Sarrobert, Catherine; Vavasseur, Alain; Véry, Anne-Aliénor

    2017-09-01

    As part of the « post-accidental » management, the DEMETERRES project (RSNR PIA) proposes to develop innovative and environmentally friendly methods for removal of cesium and strontium from soils and liquid matrices in order to rehabilitate them for an agricultural use while minimizing the volume of generated wastes in accordance with the nuclear waste existing processes. Complementary approaches are used: they are based on physico-chemical technologies (such as foams flotation, supercritical CO2 extraction, extractants in fluidized bed reactor …) and biological ones (bioextractants, phytoextraction) which concepts are described. These researches aim to design innovative and performing extractants in term of selectivity and to achieve the pilot reactor phase for each of them. These pilots will group in a network to provide a technological platform lasting the project, to which will be attached an available network of experts. The respective advances of these researches are presented, completed of tests initiated in Japan on contaminated soils through partnerships.

  14. DEMETERRES project: development of innovative technologies for removing radionuclides from contaminated solid and liquid matrices

    Directory of Open Access Journals (Sweden)

    Chagvardieff Pierre

    2017-01-01

    Full Text Available As part of the « post-accidental » management, the DEMETERRES project (RSNR PIA proposes to develop innovative and environmentally friendly methods for removal of cesium and strontium from soils and liquid matrices in order to rehabilitate them for an agricultural use while minimizing the volume of generated wastes in accordance with the nuclear waste existing processes. Complementary approaches are used: they are based on physico-chemical technologies (such as foams flotation, supercritical CO2 extraction, extractants in fluidized bed reactor … and biological ones (bioextractants, phytoextraction which concepts are described. These researches aim to design innovative and performing extractants in term of selectivity and to achieve the pilot reactor phase for each of them. These pilots will group in a network to provide a technological platform lasting the project, to which will be attached an available network of experts. The respective advances of these researches are presented, completed of tests initiated in Japan on contaminated soils through partnerships.

  15. Pilot studies for the North American Soil Geochemical Landscapes Project - Site selection, sampling protocols, analytical methods, and quality control protocols

    Science.gov (United States)

    Smith, D.B.; Woodruff, L.G.; O'Leary, R. M.; Cannon, W.F.; Garrett, R.G.; Kilburn, J.E.; Goldhaber, M.B.

    2009-01-01

    In 2004, the US Geological Survey (USGS) and the Geological Survey of Canada sampled and chemically analyzed soils along two transects across Canada and the USA in preparation for a planned soil geochemical survey of North America. This effort was a pilot study to test and refine sampling protocols, analytical methods, quality control protocols, and field logistics for the continental survey. A total of 220 sample sites were selected at approximately 40-km intervals along the two transects. The ideal sampling protocol at each site called for a sample from a depth of 0-5 cm and a composite of each of the O, A, and C horizons. The Ca, Fe, K, Mg, Na, S, Ti, Ag, As, Ba, Be, Bi, Cd, Ce, Co, Cr, Cs, Cu, Ga, In, La, Li, Mn, Mo, Nb, Ni, P, Pb, Rb, Sb, Sc, Sn, Sr, Te, Th, Tl, U, V, W, Y, and Zn by inductively coupled plasma-mass spectrometry and inductively coupled plasma-atomic emission spectrometry following a near-total digestion in a mixture of HCl, HNO3, HClO4, and HF. Separate methods were used for Hg, Se, total C, and carbonate-C on this same size fraction. Only Ag, In, and Te had a large percentage of concentrations below the detection limit. Quality control (QC) of the analyses was monitored at three levels: the laboratory performing the analysis, the USGS QC officer, and the principal investigator for the study. This level of review resulted in an average of one QC sample for every 20 field samples, which proved to be minimally adequate for such a large-scale survey. Additional QC samples should be added to monitor within-batch quality to the extent that no more than 10 samples are analyzed between a QC sample. Only Cr (77%), Y (82%), and Sb (80%) fell outside the acceptable limits of accuracy (% recovery between 85 and 115%) because of likely residence in mineral phases resistant to the acid digestion. A separate sample of 0-5-cm material was collected at each site for determination of organic compounds. A subset of 73 of these samples was analyzed for a suite of

  16. Interpreting sensor measurements in dikes - experiences from UrbanFlood pilot sites

    NARCIS (Netherlands)

    Simm, J.; Jordan, D.; Topple, A.; Mokhov, I.; Pyayt, A.; Abdoun, T.; Bennett, V.; Broekhuijsen, J.; Meijer, R.; Klijn, F.; Schweckendiek, T.

    2012-01-01

    The UrbanFlood project is creating an Early Warning System framework that can be used to link sensors via the Internet to predictive models and emergency warning systems. The project includes four pilot sites to apply and validate at full scale the technology being developed in the project:

  17. Site selection and evaluation studies of the Waste Isolation Pilot Plant (WIPP), Los Medanos, Eddy County, NM

    International Nuclear Information System (INIS)

    Griswold, G.B.

    1977-12-01

    Bedded-salt deposits of the Salado Formation have been selected for evaluation for a proposed Waste Isolation Pilot Plant (WIPP) to be located in Eddy County, NM, approximately 26 mi east of Carlsbad. Site selection and evaluation studies that included geologic mapping, geophysical surveys, drilling, and resource appraisal were conducted over and under the prospective location. The lower portion of the Salado meets essential criteria for waste isolation. Beds chosen for waste storage lie 2074 to 2730 ft below the surface. High-purity salt exists at these depths, and the geologic structure revealed by geophysical surveys indicates that these beds are essentially flat. Additional geophysical surveys are now under way. The initial interpretation of the new data indicates that more structure may exist in the salt beds in the northern portion of the site area. Full evaluation of potentially commercial deposits of potash and natural gas within the WIPP site will be reported by separate studies, as will be the hydrologic details of the region

  18. Micronutrient Supplementation, Dietary Intervention and Resulting Body Weight Gain of Severe Acute Malnourished Children – A Pilot Project Study of OJUS Medical Institute with Existing ICDS Project in Nasik District, Maharashtra

    Directory of Open Access Journals (Sweden)

    Subhasree Ray

    2014-12-01

    Full Text Available Introduction: OJUS Medical Institute in collaboration with Women & Child development department of Nashik District, Maharashtra conducted a target oriented pilot project study to see the improvement in body weight gain of SAM children, supplemented with nutritionally enriched diet and micronutrients. The Egg-DOT project is a target vertical intervention study that involved both Anganwadi workers and Community health workers to bring a fruitful result by working hand-in-hand. Rationale: ICDS is one of the best supplementary nutrition programs to address and eliminate malnutrition from the country. To make it more comprehensive and result oriented the pilot project study is formulated and executed to see if the addition in existing system could eradicate malnutrition in an effective manner and strengthen the Govt. health machinery. Objective: The study aimed at working along with the Govt. to reduce severity of malnutrition. It shouted for a healthy public-private relationship to bring optimum result from the existing Govt. project in reducing burden of malnutrition, spreading health education and behavioural modification in the community members by adopting a systematic micronutrient-diet-health education  intervention strategy. Materials & methods: Along with existing nutritional intervention, a small modification in diet is introduced to fulfill the deficit of 300 Kcal approximately. Good quality fat and protein are added to the Anganwadi meal with daily micronutrient supplementation. The supplementation is continued for 30 days in 25 SAM children of 3 to 5 years. The baseline and end line body weight measurements are taken and compared to see the improvement. Result: After 30 days of intervention the supplemented SAM children showed statistically significant increased body weight (P<0.01 with an overall healthy nutritional status. Conclusion: The study showed that public-private collaborative systematic strategy with proper

  19. Pilot Study: Foam Wedge Chin Support Static Tolerance Testing

    Science.gov (United States)

    2017-10-24

    AFRL-SA-WP-SR-2017-0026 Pilot Study: Foam Wedge Chin Support Static Tolerance Testing Austin M. Fischer, BS1; William W...COVERED (From – To) April – October 2017 4. TITLE AND SUBTITLE Pilot Study: Foam Wedge Chin Support Static Tolerance Testing 5a. CONTRACT NUMBER...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) USAF School of Aerospace

  20. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  1. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    Science.gov (United States)

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

  2. Partitioning technologies and actinide science: towards pilot facilities in Europe (ACSEPT project)

    International Nuclear Information System (INIS)

    Bourg, S.; Hill, C.; Ouvrier, N.

    2010-01-01

    ACSEPT is an essential contribution to the demonstration, in the long term, of the potential benefits of actinide recycling to minimize the burden on the geological repositories. To succeed, ACSEPT is organized into three technical domains: (i) Considering technically mature aqueous separation processes, ACSEPT works to optimize and select the most promising ones dedicated either to actinide partitioning or to grouped actinide separation. A substantial review was undertaken either to be sure that the right molecule families are being studied, or, on the contrary, to identify new candidates. Results of the first hot tests allowed the validation of some process options. (ii) Concerning pyrochemical separation processes, ACSEPT is focused on the enhancement of the two reference cores of process selected within EUROPART with specific attention to the exhaustive electrolysis in molten chloride (quantitative recovery of the actinides with the lowest amount of fission products) and to actinide back-extraction from an An-Al alloy. R and D efforts are also brought to key scientific and technical issues compulsory for building a complete separation process (head-end steps, salt treatment for recycling and waste management). (iii) By integrating all the experimental results within engineering and systems studies, both in hydro and pyro domains, ACSEPT will deliver relevant flowsheets and recommendations to prepare for future demonstration at a pilot level, in relation with strategies developed through the SNE-TP. In addition, a training and education programme is implemented to share the knowledge among the partitioning community and the future generations of researchers

  3. The SUPERCOMET 2 Project: Teacher Seminar and Teacher Guide

    Science.gov (United States)

    Engstrom, V.; Ireson, G.; Latal, H.; Mathelitsch, L.; Michelini, M.; Peeters, W.; Rath, G.

    2008-05-01

    The Leonardo da Vinci pilot projects SUPERCOMET (2001-2004) and SUPERCOMET 2 (2004-2007) developed and tested teacher training materials for active, minds-on learning of electromagnetism and superconductivity at the level of upper secondary school. New multimedia materials for the pupils supported the teacher materials, including a teacher seminar in 4 half-day modules detailing the scientific contents, teaching methods, using ICT in physics teaching and learning, online collaboration and further resources for exploring the selected topics. The aim of these projects were to improve the quality of physics teaching on a European level, involving a combined total of 45 partners in 16 countries, and conducting trials at 67 schools with approx. 230 teachers, 280 trainee teachers and 2200 pupils. New follow-up projects develop hands-on materials for carrying out the activities described in the teacher guide and seminars and additional teacher materials involving modelling, simulations and data logging.

  4. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat

  5. Spiral model pilot project information model

    Science.gov (United States)

    1991-01-01

    The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

  6. Pilot project of biogas production from pig manure and urine mixture at ambient temperature in Ventanilla (Lima, Peru)

    International Nuclear Information System (INIS)

    Ferrer, I.; Gamiz, M.; Almeida, M.; Ruiz, A.

    2009-01-01

    Parque Porcino de Ventanilla has an extension of 840 ha with 2200 farmers dedicated to pig production. There is a lack of services in the area (i.e., water supply, electricity, or waste collection). Anaerobic treatment of pig manure would replace current dumping and incineration, reducing environmental pollution and hazards to public health, as well as providing an organic fertilizer and biogas. The objective of the present work was to study the viability of ambient temperature anaerobic digestion of pig manure diluted in urine, by means of on-site pilot scale reactors. The final goal was to establish design parameters for anaerobic digesters to be implemented; since it was part of a project to improve life conditions for the farmers through the incorporation of better management techniques. Experiments were carried out in a low-cost pilot plant, which consists of three anaerobic digesters (225 L total volume), without heating or agitation, placed in a greenhouse. The start-up of the digestion process was performed with a mixture of temperature adapted pig manure-sludge and fresh rumen, and showed a good performance regardless of the dilution of pig manure with water or urine, which is a key parameter due to the scarcity of water in the area under study

  7. Pilot project of biogas production from pig manure and urine mixture at ambient temperature in Ventanilla (Lima, Peru).

    Science.gov (United States)

    Ferrer, I; Gamiz, M; Almeida, M; Ruiz, A

    2009-01-01

    Parque Porcino de Ventanilla has an extension of 840ha with 2200 farmers dedicated to pig production. There is a lack of services in the area (i.e., water supply, electricity, or waste collection). Anaerobic treatment of pig manure would replace current dumping and incineration, reducing environmental pollution and hazards to public health, as well as providing an organic fertilizer and biogas. The objective of the present work was to study the viability of ambient temperature anaerobic digestion of pig manure diluted in urine, by means of on-site pilot scale reactors. The final goal was to establish design parameters for anaerobic digesters to be implemented; since it was part of a project to improve life conditions for the farmers through the incorporation of better management techniques. Experiments were carried out in a low-cost pilot plant, which consists of three anaerobic digesters (225L total volume), without heating or agitation, placed in a greenhouse. The start-up of the digestion process was performed with a mixture of temperature adapted pig manure-sludge and fresh rumen, and showed a good performance regardless of the dilution of pig manure with water or urine, which is a key parameter due to the scarcity of water in the area under study.

  8. Pilot training of non-nuclear professionals within CORONA project

    International Nuclear Information System (INIS)

    Ilieva, K.; Manolova, M.; Belousov, S.

    2013-01-01

    The pilot training results shown that the used approach is appropriate and could be disseminate among the interested parties. • The interest from the side of the different professionals is an important indicator about the necessity to care such courses for non-nuclear professionals.The effectiveness of the training program for non-nuclear specialists will be assessed using the replies of the Course evaluation form as well as the feedback from employers, trainers and observers

  9. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  10. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  11. Pilot RCM application to the Diablo Canyon main stream system

    International Nuclear Information System (INIS)

    Groff, C.R.; Beckham, P.E.; Bych, K.H.

    1988-01-01

    In 1986 Pacific Gas ampersand Electric Company (PG ampersand E) became extremely interested in reliability-centered maintenance (RCM) after the initial review of two successful Electric Power Research Institute sponsored projects. RCM was visualized as a methodology to common sensitize the burgeoning preventive maintenance (PM) program at the Diablo Canyon plant. RCM could further the uses of predictive and condition-monitoring techniques, as well as eliminate maintenance on components whose failures were noncritical. An extensive review of maintenance and operation experience data, in conjunction with plant staff recommendations and a prioritization according to maintenance expenditures and operational/safety significance, produced the selected system: the turbine main steam supply system (main steam). The pilot project segmented the main steam system into eight subsystems to aid in analysis: (a) main steam isolation valves, (b) auxiliary feedwater pump turbine, (c) overpressure protection (steam dump), (d) main feedwater pump turbines, (e) main steam, (f) main turbine, (g) steam blowdown, and (h) moisture separator reheaters. System analysis activities, including the preparation of functional failure analyses, failure modes and effects analyses, and logic model analyses, were conducted in parallel with corrective and preventive maintenance data-gathering activities to maximize project team personnel participation during the project. Results and lessons learned are summarized

  12. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  13. Feature Subset Selection and Instance Filtering for Cross-project Defect Prediction - Classification and Ranking

    Directory of Open Access Journals (Sweden)

    Faimison Porto

    2016-12-01

    Full Text Available The defect prediction models can be a good tool on organizing the project's test resources. The models can be constructed with two main goals: 1 to classify the software parts - defective or not; or 2 to rank the most defective parts in a decreasing order. However, not all companies maintain an appropriate set of historical defect data. In this case, a company can build an appropriate dataset from known external projects - called Cross-project Defect Prediction (CPDP. The CPDP models, however, present low prediction performances due to the heterogeneity of data. Recently, Instance Filtering methods were proposed in order to reduce this heterogeneity by selecting the most similar instances from the training dataset. Originally, the similarity is calculated based on all the available dataset features (or independent variables. We propose that using only the most relevant features on the similarity calculation can result in more accurate filtered datasets and better prediction performances. In this study we extend our previous work. We analyse both prediction goals - Classification and Ranking. We present an empirical evaluation of 41 different methods by associating Instance Filtering methods with Feature Selection methods. We used 36 versions of 11 open source projects on experiments. The results show similar evidences for both prediction goals. First, the defect prediction performance of CPDP models can be improved by associating Feature Selection and Instance Filtering. Second, no evaluated method presented general better performances. Indeed, the most appropriate method can vary according to the characteristics of the project being predicted.

  14. Pilot projects for the remediation of Sillamaee uranium tailings in Estonia

    International Nuclear Information System (INIS)

    Kaasik, T.; Siinmaa, A.

    2001-01-01

    First Estonian uranium, produced in a pilot plant at Narva, was presented to Soviet military administration in 1945 and just a year later - 1946 - installation of an uranium production plant was started at Sillamaee, Estonia. Estonian local ore - alum shale - containing only 0,026% of uranium was used for uranium production for nearly five years, after the plant was launched in 1948. The uranium mine, having been activated from 1947 to 1952, was left in status of 'active conservation' for 17 years, until finally closed in 1969. Potential threats of this hidden legacy have never been revealed. After close-down of local uranium mine, more than 4 million tons of ore, imported mostly from Central and East European countries: Czechoslovakia, Hungary and Eastern Germany were processed at Sillamaee. These activities have left a large tailings impoundment with the total volume of ca. 8 million cubic meters in the immediate vicinity of the Baltic Sea. Today the plant is privatized, converted to civil purposes and provides together its power generating facilities ca. 1200 jobs in the socially sensitive area of North-East Estonia, while environmental hazards of the history, however, remain: - Continuous seepage of tailing waters into the sea contributes and would contribute over long term to the pollution of the Baltic Sea; - stability of the tailings dam seaside under present conditions can not be guaranteed thus risking a sudden release of partly liquid tailings due to potential dam failure; - uncovered surface of the tailings presents a health hazard due to dusting and radon release and hinders the revitalization of the area. The conceptual design of the Estonia's largest environmental remediation project, done by Wismut, is now complete and first implementation steps are underway. The project for mine area restoration is in initiation phase; it shall reveal the current and potential environmental hazards of the facility and create the concept for necessary rehabilitation

  15. Selective absorption pilot plant for decontamination of fuel reprocessing plant off-gas

    Energy Technology Data Exchange (ETDEWEB)

    Stephenson, M.J.; Eby, R.S.; Huffstetler, V.C.

    1977-10-01

    A fluorocarbon-based selective absorption process for removing krypton-85, carbon-14, and radon-222 from the off-gas of conventional light water and advanced reactor fuel reprocessing plants is being developed at the Oak Ridge Gaseous Diffusion Plant in conjunction with fuel recycle work at the Oak Ridge National Laboratory and at the Savannah River Laboratory. The process is characterized by an especially high tolerance for many other reprocessing plant off-gas components. This report presents detailed drawings and descriptions of the second generation development pilot plant as it has evolved after three years of operation. The test facility is designed on the basis of removing 99% of the feed gas krypton and 99.9% of the carbon and radon, and can handle a nominal 15 scfm (425 slm) of contaminated gas at pressures from 100 to 600 psig (7.0 to 42.2 kg/cm/sup 2/) and temperatures from minus 45 to plus 25/sup 0/F (-43 to -4/sup 0/C). Part of the development program is devoted to identifying flowsheet options and simplifications that lead to an even more economical and reliable process. Two of these applicative flowsheets are discussed.

  16. Reflections on a Pilot Project: Removing the "Dis" from Disability

    Science.gov (United States)

    Yee, Michelle J.

    2012-01-01

    This paper explores preliminary results of a pilot study whose purpose was to document, through an oral history narrative, the personal and work experiences of a female artist and social entrepreneur who is legally blind. These experiences included the challenges that the research participant has experienced in the U.S. as a woman with an…

  17. Manpower Projections, Recruitment Needs and Training Requirements for Commercial Airline Pilots in the United States 1968-1979.

    Science.gov (United States)

    Simons, Robert Marchand

    This study evaluated the reported airline pilot shortage in relation to certified air carriers; recruitment needs for qualified applicants; training requirements as recommended by air carriers, airline captains, and flight officers; and airline pilot supply and demand during 1968-79. A literature review on foreign and domestic pilot shortages was…

  18. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    Energy Technology Data Exchange (ETDEWEB)

    Powers, D.W. [Powers (Dennis W.), Anthony, TX (United States); Martin, M.L. [International Technology, Inc., Las Vegas, NV (United States)

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries.

  19. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    International Nuclear Information System (INIS)

    Powers, D.W.; Martin, M.L.

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries

  20. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for