WorldWideScience

Sample records for pilot project selection

  1. Pilot project as enabler?

    DEFF Research Database (Denmark)

    Neisig, Margit; Glimø, Helle; Holm, Catrine Granzow

    This article deals with a systemic perspective on transition. The field of study addressed is a pilot project as enabler of transition in a highly complex polycentric context. From a Luhmannian systemic approach, a framework is created to understand and address barriers of change occurred using...... pilot projects as enabler of transition. Aspects of how to create trust and deal with distrust during a transition are addressed. The transition in focus is the concept of New Public Management and how it is applied in the management of the Employment Service in Denmark. The transition regards...

  2. Carbon dioxide cleaning pilot project

    International Nuclear Information System (INIS)

    Knight, L.; Blackman, T.E.

    1994-01-01

    In 1989, radioactive-contaminated metal at the Rocky Flats Plant (RFP) was cleaned using a solvent paint stripper (Methylene chloride). One-third of the radioactive material was able to be recycled; two-thirds went to the scrap pile as low-level mixed waste. In addition, waste solvent solutions also required disposal. Not only was this an inefficient process, it was later prohibited by the Resource Conservation and Recovery Act (RCRA), 40 CFR 268. A better way of doing business was needed. In the search for a solution to this situation, it was decided to study the advantages of using a new technology - pelletized carbon dioxide cleaning. A proof of principle demonstration occurred in December 1990 to test whether such a system could clean radioactive-contaminated metal. The proof of principle demonstration was expanded in June 1992 with a pilot project. The purpose of the pilot project was three fold: (1) to clean metal so that it can satisfy free release criteria for residual radioactive contamination at the Rocky Flats Plant (RFP); (2) to compare two different carbon dioxide cleaning systems; and (3) to determine the cost-effectiveness of decontamination process in a production situation and compare the cost of shipping the metal off site for waste disposal. The pilot project was completed in August 1993. The results of the pilot project were: (1) 90% of those items which were decontaminated, successfully met the free release criteria , (2) the Alpheus Model 250 was selected to be used on plantsite and (3) the break even cost of decontaminating the metal vs shipping the contaminated material offsite for disposal was a cleaning rate of 90 pounds per hour, which was easily achieved

  3. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. (Brookhaven National Lab., Upton, NY (United States)); Anspaugh, L.; Layton, D. (Lawrence Livermore National Lab., CA (United States))

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  4. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated

  5. Laboratory-based respiratory virus surveillance pilot project on select cruise ships in Alaska, 2013-15.

    Science.gov (United States)

    Rogers, Kimberly B; Roohi, Shahrokh; Uyeki, Timothy M; Montgomery, David; Parker, Jayme; Fowler, Nisha H; Xu, Xiyan; Ingram, Deandra J; Fearey, Donna; Williams, Steve M; Tarling, Grant; Brown, Clive M; Cohen, Nicole J

    2017-09-01

    Influenza outbreaks can occur among passengers and crews during the Alaska summertime cruise season. Ill travellers represent a potential source for introduction of novel or antigenically drifted influenza virus strains to the United States. From May to September 2013-2015, the Alaska Division of Public Health, the Centers for Disease Control and Prevention (CDC), and two cruise lines implemented a laboratory-based public health surveillance project to detect influenza and other respiratory viruses among ill crew members and passengers on select cruise ships in Alaska. Cruise ship medical staff collected 2-3 nasopharyngeal swab specimens per week from passengers and crew members presenting to the ship infirmary with acute respiratory illness (ARI). Specimens were tested for respiratory viruses at the Alaska State Virology Laboratory (ASVL); a subset of specimens positive for influenza virus were sent to CDC for further antigenic characterization. Of 410 nasopharyngeal specimens, 83% tested positive for at least one respiratory virus; 71% tested positive for influenza A or B virus. Antigenic characterization of pilot project specimens identified strains matching predominant circulating seasonal influenza virus strains, which were included in the northern or southern hemisphere influenza vaccines during those years. Results were relatively consistent across age groups, recent travel history, and influenza vaccination status. Onset dates of illness relative to date of boarding differed between northbound (occurring later in the voyage) and southbound (occurring within the first days of the voyage) cruises. The high yield of positive results indicated that influenza was common among passengers and crews sampled with ARI. This finding reinforces the need to bolster influenza prevention and control activities on cruise ships. Laboratory-based influenza surveillance on cruise ships may augment inland influenza surveillance and inform control activities. However, these

  6. Selecting pilots with crew resource management skills.

    Science.gov (United States)

    Hedge, J W; Bruskiewicz, K T; Borman, W C; Hanson, M A; Logan, K K; Siem, F M

    2000-10-01

    For years, pilot selection has focused primarily on the identification of individuals with superior flying skills and abilities. More recently, the aviation community has become increasingly aware that successful completion of a flight or mission requires not only flying skills but the ability to work well in a crew situation. This project involved development and validation of a crew resource management (CRM) skills test for Air Force transport pilots. A significant relation was found between the CRM skills test and behavior-based ratings of aircraft commander CRM performance, and the implications of these findings for CRM-based selection and training are discussed.

  7. The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Roberts, A.V.

    1995-01-01

    The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process

  8. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  9. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  10. 7 CFR 1955.132 - Pilot projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  11. Nucleus: A pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Finnell, Joshua Eugene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Martin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Cain, Brian J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-09

    The proposal is to provide institutional infrastructure that facilitates management of research projects, research collaboration, and management, preservation, and discovery of data. Deploying such infrastructure will amplify the effectiveness, efficiency, and impact of research, as well as assist researchers in regards to compliance with both data management mandates and LANL security policy. This will facilitate discoverability of LANL research both within the lab and external to LANL.

  12. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  13. PROPOSAL FOR A STEP OF SELECTION SUPPORT OF BEST PRACTICES FOR THE PILOTING OF THE EMARKETING PROJECTS

    Directory of Open Access Journals (Sweden)

    Sébastien BRUYÈRE

    2011-01-01

    Full Text Available With 1.8 billion investments on the web in the first semester of 2008, being14.7% of publicity investmentsi, E-marketing is a discipline which is in themiddle of media strategies. However, the evolutions of internet and of emarketingtools have developed a discipline becoming increasingly complexto understand.Although there are still many different methods of piloting,essentially based on the measure via the discipline of the Web Analytics, it’sdifficult today to predict e-marketing actions to set up to make fluctuate keyperformance indicators of web site and active e-marketing lever statisticauditing solution. However it is starting from these indicators that success ismeasured and that the profits of the online activities are maximized. Thus wepropose through this article, a method of qualification of the Best Practices inorder to assist the online marketers in the choice and the selection of thoseto improve the performance of a site and associated actions E-Marketing.

  14. Pilot project of atomic energy technology record

    International Nuclear Information System (INIS)

    Song, K. C.; Kim, Y. I.; Kim, Y. G.

    2011-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records in each category as a whole summary from the background to the performance at all fields of nuclear science technology which researched and developed at KAERI. This project includes Data and Document Management System(DDMS) that will be the system to collect, organize and preserve various records occurred in each research and development process. To achieve these goals, many problems should be solved to establish technology records process, such as issues about investigation status of technology records in KAERI, understanding and collection records, set-up project system and selection target field, definition standards and range of target records. This is a research report on the arrangement of research contents and results about pilot project which records whole nuclear technology researched and developed at KAERI in each category. Section 2 summarizes the overview of this pilot project and the current status of technology records in domestic and overseas, and from Section 3 to Section 6 summarize contents and results which performed in this project. Section 3 summarizes making TOC(Table of Content) and technology records, Section 4 summarizes sectoral templates, Section 5 summarizes writing detailed plan of technology records, and Section 6 summarizes Standard Document Numbering System(SDNS). Conclusions of this report are described in Section 7

  15. Electrocoagulation project: Pilot study testwork

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Garand, D.K.; Hassan, T.A.; Kar, K.L.; Thind, S.S.

    1991-09-01

    When a suspension or emulsion flows between two sacrificial metal electrodes excited by ac, the dispersed phase is consolidated and then settles. Laboratory-scale investigation of this mechanism, called electrocoagulation, and of its areas of application to water treatment were previously completed and a subsequent project was initiated to design and construct pilot-scale equipment consisting of an electrocoagulation cell, power supply, and computerized control system. The constructed pilot plant was used to test the effectiveness of electrocoagulation to clarify coal processing plant effluent. Results obtained with clay suspensions showed that flow conditions in the cell have a major effect on electric power consumption, and a reduction by a factor of three on this crucial cost parameter appeared possible compared to a previously tested batch-scale electrocoagulation system. Results obtained using the coal plant thickener feed closely duplicated those obtained with the clay mixtures. Aluminum electrode consumption, however, remained unchanged compared to the bench-scale tests. Supernatant clarity far exceeded requirements, while settling rate was too low. The settling could be speeded up by appropriate use of chemicals, but such addition affects the coagulation mechanism and reduces supernatant clarity. A tradeoff between settling rate and clarity was thus established. The total cost of treatment was deemed to be in excess of coal company requirements, but the pilot tests revealed much about the electrocoagulation system under continuous flow conditions. The technology is seen as having application in other areas such as municipal and industrial waste treatment. 22 refs., 6 figs., 2 tabs.

  16. Pilot studies for the North American Soil Geochemical Landscapes Project - Site selection, sampling protocols, analytical methods, and quality control protocols

    Science.gov (United States)

    Smith, D.B.; Woodruff, L.G.; O'Leary, R. M.; Cannon, W.F.; Garrett, R.G.; Kilburn, J.E.; Goldhaber, M.B.

    2009-01-01

    In 2004, the US Geological Survey (USGS) and the Geological Survey of Canada sampled and chemically analyzed soils along two transects across Canada and the USA in preparation for a planned soil geochemical survey of North America. This effort was a pilot study to test and refine sampling protocols, analytical methods, quality control protocols, and field logistics for the continental survey. A total of 220 sample sites were selected at approximately 40-km intervals along the two transects. The ideal sampling protocol at each site called for a sample from a depth of 0-5 cm and a composite of each of the O, A, and C horizons. The Ca, Fe, K, Mg, Na, S, Ti, Ag, As, Ba, Be, Bi, Cd, Ce, Co, Cr, Cs, Cu, Ga, In, La, Li, Mn, Mo, Nb, Ni, P, Pb, Rb, Sb, Sc, Sn, Sr, Te, Th, Tl, U, V, W, Y, and Zn by inductively coupled plasma-mass spectrometry and inductively coupled plasma-atomic emission spectrometry following a near-total digestion in a mixture of HCl, HNO3, HClO4, and HF. Separate methods were used for Hg, Se, total C, and carbonate-C on this same size fraction. Only Ag, In, and Te had a large percentage of concentrations below the detection limit. Quality control (QC) of the analyses was monitored at three levels: the laboratory performing the analysis, the USGS QC officer, and the principal investigator for the study. This level of review resulted in an average of one QC sample for every 20 field samples, which proved to be minimally adequate for such a large-scale survey. Additional QC samples should be added to monitor within-batch quality to the extent that no more than 10 samples are analyzed between a QC sample. Only Cr (77%), Y (82%), and Sb (80%) fell outside the acceptable limits of accuracy (% recovery between 85 and 115%) because of likely residence in mineral phases resistant to the acid digestion. A separate sample of 0-5-cm material was collected at each site for determination of organic compounds. A subset of 73 of these samples was analyzed for a suite of

  17. Advanced engineering environment pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty (Parametric Technology Corporation, Needham, MA)

    2006-10-01

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

  18. The national conversion pilot project

    International Nuclear Information System (INIS)

    Van Der Puy, M.; Francis, G.; Konczal, M.

    1994-01-01

    The Department of Energy is now faced with the prospect of terminating traditional defense production missions at several Department of Energy sites. Because of this, there is a critical need to develop a DOE process to convert former defense production facilities to private use so that underutilized workers and facilities may be used to minimize the impact on the United States economy. The purpose of the National Conversation Pilot Project (NCPP) at Rocky Flats near Denver, Colorado is to explore and demonstrate the feasibility of economic conversion of DOE facilities, in a manner consistent with ongoing site waste management and cleanup activities, and non-prejudicial to future land use planning decisions. The NCPP is divided into three stages: The first stage, now under way, is one of detailed planning for cleanup and building maintenance activities. The second stage involves building cleanup necessary to support the proposed industrial activities, maintenance of equipment and building infrastructure necessary to assure protection of human health and the environment, declassification work, and some small scale research and development activities. Stage III would involve DOE metals recycling. Specific approval from the DOE is required prior to each project stage. To ensure stakeholder involvement, a steering committee will advise the DOE on the desirability to proceed with the project from stage to stage. A key question in the conversion process is whether a competitive economic and regulatory environment can be created on a DOE facility, allowing an onsite conversion business to effectively compete with offsite businesses. If successful, the Rocky Flats project could become the model for economic conversion at other DOE facilities

  19. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  20. Electronic Government : Caribbean Pilot Project | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Electronic Government : Caribbean Pilot Project. Caribbean countries are increasingly adopting information and communication technologies (ICTs) in ... The Government of Jamaica is willing to donate the solution to other ... Related content ...

  1. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  2. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Christenson, Norm; Walters, Jerel

    2014-12-31

    This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

  3. Communication Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Annah (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-09-15

    The project of building a large wind farm like Lillgrund, the third largest offshore wind farm in the world, takes a considerable effort when it comes to communication and information. When the main questions 'What should be communicated?', 'To whom should this information be communicated?' and 'How should the information be communicated?' are answered, it is time to take action and actually communicate and inform. A fundamental part of the communication process is psychology. For the entrepreneur to understand that people are worried about the possible change in their living situation and deal with that is essential for how people are going to react to the plans of a potential wind farm. When Vattenfall bought the Lillgrund project a humble tone and availability were two key components in the way in which the project group approached the local residents, authorities and the general public. The goal was to achieve acceptance from the local residents and authorities and make them feel comfortable with the project and Vattenfall. Communication has been a cornerstone of the project during the whole process. A few of the activities that were carried out are media activities, open meetings for the public, exhibitions, advertisements, meetings with authorities, internal and external study visits to the site, cooperation with Malmoe city, participation in conferences and a grand opening ceremony. The basis for the activities has been the active inviting of organisations, neighbours and others. Thanks to the efforts of the whole project group and all others that were involved, the communication process was very successful. The 'Lillgrund model' will be the foundation for coming communication processes and has provided Vattenfall with a lot of experience regarding communication and information issues

  4. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Joe Jones; Clive Barton; Mark Clayton; Al Yablonsky; David Legere

    2010-09-30

    This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

  5. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  6. Participatory forest management in Ethiopia: learning from pilot projects.

    Science.gov (United States)

    Ameha, Aklilu; Larsen, H O; Lemenih, Mulugeta

    2014-04-01

    Different arrangements of decentralized forest management have been promoted as alternatives to centralized and top down approaches to halt tropical deforestation and forest degradation. Ethiopia is one of the countries piloting one of these approaches. To inform future programs and projects it is essential to learn from existing pilots and experiences. This paper analyses five of the pilot participatory forest management (PFM) programs undertaken in Ethiopia. The study is based on the Forest User Group (FUG) members' analyses of the programs using selected outcome variables: forest income, change in forest conditions, forest ownership feelings and effectiveness of FUGs as forest managing institutions. These variables were assessed at three points in time-before the introduction of PFM, during the project implementation and after the projects ended. Data were collected using group discussions, key informant interviews and transect walks through the PFM forests. The results show that in all of the five cases the state of the forest is perceived to have improved with the introduction of PFM, and in four of the cases the improvement was maintained after projects ended. Regulated access to the forests following introduction of PFM was not perceived to have affected forest income negatively. There are, however, serious concerns about the institutional effectiveness of the FUGs after projects ended, and this may affect the success of the PFM approach in the longer term.

  7. US/Brazil joint pilot project objectives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

  8. The ATLAS Level-2 Trigger Pilot Project

    CERN Document Server

    Wickens, F J

    2000-01-01

    The Level-2 Trigger Pilot Project of ATLAS, one of the two general purpose LHC experiments, is part of the on-going programme to develop the ATLAS High Level Triggers (HLT). The Level-2 Trigger will receive events at up to 100 kHz, which has to be reduced to a rate suitable for full event-building of the order of 1 kHz. To reduce the data collection bandwidth and processing power required for the challenging Level-2 task it is planned to use Region of Interest guidance (from Level-1) and sequential processing. The Pilot Project included the construction and use of testbeds of up to 48 processing nodes, development of optimised components and computer simulations of a full system. It has shown how the required performance can be achieved, using largely commodity components and operating systems, and validated an architecture for the Level-2 system. This paper describes the principal achievements and conclusions of this project. (28 refs).

  9. The ATLAS Level-2 Trigger Pilot Project

    CERN Document Server

    Blair, R; Haberichter, W N; Schlereth, J L; Bock, R; Bogaerts, A; Boosten, M; Dobinson, Robert W; Dobson, M; Ellis, Nick; Elsing, M; Giacomini, F; Knezo, E; Martin, B; Shears, T G; Tapprogge, Stefan; Werner, P; Hansen, J R; Wäänänen, A; Korcyl, K; Lokier, J; George, S; Green, B; Strong, J; Clarke, P; Cranfield, R; Crone, G J; Sherwood, P; Wheeler, S; Hughes-Jones, R E; Kolya, S; Mercer, D; Hinkelbein, C; Kornmesser, K; Kugel, A; Männer, R; Müller, M; Sessler, M; Simmler, H; Singpiel, H; Abolins, M; Ermoline, Y; González-Pineiro, B; Hauser, R; Pope, B; Sivoklokov, S Yu; Boterenbrood, H; Jansweijer, P; Kieft, G; Scholte, R; Slopsema, R; Vermeulen, J C; Baines, J T M; Belias, A; Botterill, David R; Middleton, R; Wickens, F J; Falciano, S; Bystrický, J; Calvet, D; Gachelin, O; Huet, M; Le Dû, P; Mandjavidze, I D; Levinson, L; González, S; Wiedenmann, W; Zobernig, H

    2002-01-01

    The Level-2 Trigger Pilot Project of ATLAS, one of the two general purpose LHC experiments, is part of the on-going program to develop the ATLAS high-level triggers (HLT). The Level-2 Trigger will receive events at up to 100 kHz, which has to be reduced to a rate suitable for full event-building of the order of 1 kHz. To reduce the data collection bandwidth and processing power required for the challenging Level-2 task it is planned to use Region of Interest guidance (from Level-1) and sequential processing. The Pilot Project included the construction and use of testbeds of up to 48 processing nodes, development of optimized components and computer simulations of a full system. It has shown how the required performance can be achieved, using largely commodity components and operating systems, and validated an architecture for the Level-2 system. This paper describes the principal achievements and conclusions of this project. (28 refs).

  10. Technology Cooperation Agreement Pilot Project (TCAPP)

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.; Benioff, R.

    1999-10-20

    The Technology Cooperation Agreement Pilot Project (TCAPP) is helping developing countries design and implement actions to attract investment in clean energy technologies that will meet their economic development goals, while mitigating greenhouse gas emissions. TCAPP was launched by three US government agencies -- the US Agency for International Development (USAID), the US Environmental Protection Agency (USEPA), and the US Department of Energy (USDOE) -- in August 1997 to establish a model for climate change technology cooperation with developing and transition countries. This report describes the TCAPP approach and the significant progress made by the participating countries.

  11. Swiss electricity grid - Benchmarking pilot project

    International Nuclear Information System (INIS)

    2001-01-01

    This article is a short version of the ENET number 210369. This report for the Swiss Federal Office of Energy (SFOE) describes a benchmarking pilot project carried out as a second phase in the development of a formula for the regulation of an open electricity market in Switzerland. It follows on from an initial phase involving the definition of a 'blue print' and a basic concept. The aims of the pilot project - to check out the practicability of the concept - are discussed. The collection of anonymised data for the benchmarking model from over 30 electricity utilities operating on all 7 Swiss grid levels and their integration in the three areas 'Technology', 'Grid Costs' and 'Capital Invested' are discussed in detail. In particular, confidentiality and data protection aspects are looked at. The methods used in the analysis of the data are described and the results of an efficiency analysis of various utilities are presented. The report is concluded with a listing of questions concerning data collection and analysis as well as operational and capital costs that are still to be answered

  12. The HADES demonstration and pilot project

    International Nuclear Information System (INIS)

    Bruyn, D.de; Meynendonckx, P.; Neerdael, B.; Noynaert, L.; Voet, M.; Volckaert, G.; Bonne, A.

    1988-01-01

    This report deals with the activities of SCK/CEN and its subcontractors performed during the years 1986-87 in the framework of the HADES demonstration and pilot project, which is carried out in the geological Boom clay formation underlying the nuclear research establishment at Mol. This demonstration and pilot project is sponsored by the Commission of the European Communities under contract number Fl1W-004 B (B) in the framework of Part B of the CEC programme on radioactive waste management and disposal. The actions undertaken and reported here deal essentially with design and engineering activities in preparation for the construction of a test drift and of a mine-by-test directly related to this construction test and of a combined irradiation/heating test to be performed later on in this test drift. A time schedule for the various tests planned to be made in the test drift has also been worked out taking into account time and spatial dependencies

  13. 76 FR 56868 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-09-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... proceed with the initiation of a U.S.-Mexico cross-border long-haul trucking pilot program to test and...

  14. 76 FR 56272 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-09-12

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... cross-border long-haul trucking pilot program to test and demonstrate the ability of Mexico-domiciled...

  15. 76 FR 73765 - Pilot Project on NAFTA Trucking Provisions

    Science.gov (United States)

    2011-11-29

    ...-0097] Pilot Project on NAFTA Trucking Provisions AGENCY: Federal Motor Carrier Safety Administration... that have applied to participate in the Agency's long- haul pilot program to test and demonstrate the... proceed with the initiation of a U.S.-Mexico cross-border long-haul trucking pilot program to test and...

  16. Scaling the quality of clinical audit projects: a pilot study.

    Science.gov (United States)

    Millard, A D

    1999-06-01

    To pilot the development of a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments, assessing the quality of clinical audit projects, to form a Likert scale. The audit facilitators were based in Scottish health boards and trusts. The participants were audit facilitators known to have over 2 years experience of supporting clinical audit. The response at first test was 11 out of 14 and at the second test it was 27 out of 46. The draft scale was tested by 27 audit facilitators who expressed their strength of agreement or disagreement with each statement for three reports. Validity was assessed by test-re-test, item-total, and total-global indicator correlations. Of the 20 statements, 15 had satisfactory correlations with scale totals. Scale totals had good correlations with global indicators. Test-re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  17. The ESA Space Weather Applications Pilot Project

    Science.gov (United States)

    Glover, A.; Hilgers, A.; Daly, E.

    Following the completion in 2001 of two parallel studies to consider the feasibility of a European Space Weather Programme ESA embarked upon a space weather pilot study with the goal of prototyping European space weather services and assessing the overall market for such within Europe This pilot project centred on a number of targeted service development activities supported by a common infrastructure and making use of only existing space weather assets Each service activity included clear participation from at least one identified service user who was requested to provide initial requirements and regular feedback during the operational phase of the service These service activities are now reaching the end of their 2-year development and testing phase and are now accessible each with an element of the service in the public domain see http www esa-spaceweathet net swenet An additional crucial element of the study was the inclusion of a comprehensive and independent analysis of the benefits both economic and strategic of embarking on a programme which would include the deployment of an infrastructure with space-based elements The results of this study will be reported together with their implication for future coordinated European activities in this field

  18. Location Independent Professional Project: A Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  19. Bio-Manufacturing to market pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Dressen, Tiffaney [Univ. of California, Berkeley, CA (United States)

    2017-09-25

    The Bio-Manufacturing to Market pilot project was a part of the AMJIAC, the Advanced Manufacturing Jobs and Innovation Accelerator Challenge grant. This internship program set out to further define and enhance the talent pipeline from the University and local Community Colleges to startup culture in East Bay Area, provide undergraduate STEM students with opportunities outside academia, and provide startup companies with much needed talent. Over the 4 year period of performance, the Bio-Manufacturing to Market internship program sponsored 75 undergraduate STEM students who were able to spend anywhere from one to six semesters working with local Bay Area startup companies and DOE sponsored facilities/programs in the biotech, bio-manufacturing, and biomedical device fields.

  20. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    Science.gov (United States)

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  1. The National Map - Missouri Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  2. The National Map - Delaware Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  3. The National Map - Pennsylvania Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  4. The National Map - Texas Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  5. The National Map - Florida Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  6. The Citizenship Safety Project: a pilot study.

    Science.gov (United States)

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  7. A pilot project on non-conventional learning

    OpenAIRE

    Fernandes, Sara; Cerone, Antonio; Barbosa, L. S.

    2013-01-01

    This poster presents a pilot project on non-conventional learning strategies based on students’ active participation in real-life FLOSS projects. The aim of the project is to validate the hypothesis that the peer-production model, which underlies most FLOSS projects, can enhance the learning-teaching process based on extensive and systematic collaborative practices.

  8. Global Climate Change Pilot Course Project

    Science.gov (United States)

    Schuenemann, K. C.; Wagner, R.

    2011-12-01

    In fall 2011 a pilot course on "Global Climate Change" is being offered, which has been proposed to educate urban, diverse, undergraduate students about climate change at the introductory level. The course has been approved to fulfill two general college requirements, a natural sciences requirement that focuses on the scientific method, as well as a global diversity requirement. This course presents the science behind global climate change from an Earth systems and atmospheric science perspective. These concepts then provide the basis to explore the effect of global warming on regions throughout the world. Climate change has been taught as a sub-topic in other courses in the past solely using scientific concepts, with little success in altering the climate change misconceptions of the students. This pilot course will see if new, innovative projects described below can make more of an impact on the students' views of climate change. Results of the successes or failures of these projects will be reported, as well as results of a pre- and post-course questionnaire on climate change given to students taking the course. Students in the class will pair off and choose a global region or country that they will research, write papers on, and then represent in four class discussions spaced throughout the semester. The first report will include details on the current climate of their region and how the climate shapes that region's society and culture. The second report will discuss how that region is contributing to climate change and/or sequestering greenhouse gases. Thirdly, students will discuss observed and predicted changes in that region's climate and what impact it has had, and could have, on their society. Lastly, students will report on what role their region has played in mitigating climate change, any policies their region may have implemented, and how their region can or cannot adapt to future climate changes. They will also try to get a feel for the region

  9. National Conversion Pilot Project Waste Management Program

    International Nuclear Information System (INIS)

    Engelmann, G.G.; Simmons, M.S.

    1995-01-01

    The U.S. Department of Energy facilities are in the process of downsizing. Most plans for downsizing focus on the decontamination and decommissioning of excess production facilities. A different approach for downsizing is taken at Rocky Flats Environmental Technology Site (RFETS), which has four production buildings. These buildings were used for the production of weapons components from uranium and beryllium and contain unique and valuable equipment, such as rolling mills, furnaces, and high-capacity presses, which could be utilized for stage-III metal recycling. The mission of this National Conversion Pilot Project (NCPP) open-quotes is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities.close quotes The NCPP has been divided into three stages: 1. Stage I-planning and feasibility determination 2. Stage II-facility cleanup for reuse and operational assessment 3. Stage III-metals recycling. The NCPP has recently been approved to begin stage II. The objective of the NCPP stage II is to prepare the four NCPP buildings for stage III, to remove unwanted equipment, and to decontaminate buildings and essential equipment to levels consistent with those that commercial industrial operations must meet pursuant to applicable Occupational Safety and Health Administration, U.S. Environmental Protection Agency, U.S. Nuclear Regulatory Commission, and state workplace regulations

  10. ANL CP-5 decontamination and decommissioning project necessary and sufficient pilot. Report of the standards identification team on the selection of the necessary and sufficient standards set

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The CP-5 reactor was a heavy-water moderated and cooled, highly-enriched uranium-fueled thermal reactor designed for supplying neutrons for research. The reactor was operated almost continuously for 25 years until its final shutdown in 1979. It is situated on approximately three acres in the southwestern section of Argonne National Laboratory. In 1980, all nuclear fuel and the heavy water that could be drained from the process systems were shipped off-site, and the CP-5 facility was placed into lay-up pending funding for decommissioning. It was maintained in the lay-up condition with a minimum of maintenance until 1990, when the decontamination and decommissioning (D and D) project began. This D and D project provides for the disassembly and removal of all radioactive components, equipment, and structures that are associated with the CP-5 facility. The experimental area around the CP-5 reactor has been prepared for D and D, and the area outside the facility has been remediated. The reactor primary coolant and support systems have been removed and packaged as waste. The significant remaining tasks are (1) removal of the reactor internals and the biological shield structure; (2) decontamination of the rod storage area; (3) decontamination of the various radioactive material storage and handling facilities, including the fuel pool; and (4) decontamination and dismantlement of the building. This report describes the scope of the project, identification of standards for various aspects of the project, the lessons learned, and consideration for implementation.

  11. ANL CP-5 decontamination and decommissioning project necessary and sufficient pilot. Report of the standards identification team on the selection of the necessary and sufficient standards set

    International Nuclear Information System (INIS)

    1996-05-01

    The CP-5 reactor was a heavy-water moderated and cooled, highly-enriched uranium-fueled thermal reactor designed for supplying neutrons for research. The reactor was operated almost continuously for 25 years until its final shutdown in 1979. It is situated on approximately three acres in the southwestern section of Argonne National Laboratory. In 1980, all nuclear fuel and the heavy water that could be drained from the process systems were shipped off-site, and the CP-5 facility was placed into lay-up pending funding for decommissioning. It was maintained in the lay-up condition with a minimum of maintenance until 1990, when the decontamination and decommissioning (D and D) project began. This D and D project provides for the disassembly and removal of all radioactive components, equipment, and structures that are associated with the CP-5 facility. The experimental area around the CP-5 reactor has been prepared for D and D, and the area outside the facility has been remediated. The reactor primary coolant and support systems have been removed and packaged as waste. The significant remaining tasks are (1) removal of the reactor internals and the biological shield structure; (2) decontamination of the rod storage area; (3) decontamination of the various radioactive material storage and handling facilities, including the fuel pool; and (4) decontamination and dismantlement of the building. This report describes the scope of the project, identification of standards for various aspects of the project, the lessons learned, and consideration for implementation

  12. A Pilot Astronomy Outreach Project in Bangladesh

    Science.gov (United States)

    Bhattacharya, Dipen; Mridha, Shahjahan; Afroz, Maqsuda

    2015-08-01

    In its strategic planning for the "Astronomy for Development Project," the International Astronomical Union (IAU) has ecognized, among other important missions, the role of astronomy in understanding the far-reaching possibilities for promoting global tolerance and citizenship. Furthermore, astronomy is deemed inspirational for careers in science and technology. The "Pilot Astronomy Outreach Project in Bangladesh"--the first of its kind in the country--aspires to fulfill these missions. As Bangladesh lacks resources to promote astronomy education in universities and schools, the role of disseminating astronomy education to the greater community falls on citizen science organizations. One such group, Anushandhitshu Chokro (AChokro) Science Organization, has been carrying out a successful public outreach program since 1975. Among its documented public events, AChokro organized a total solar eclipse campaign in Bangladesh in 2009, at which 15,000 people were assembled in a single open venue for the eclipse observation. The organization has actively pursued astronomy outreach to dispel public misconceptions about astronomical phenomena and to promote science. AChokro is currently working to build an observatory and Science Outreach Center around a recently-acquired 14-inch Scmidt-Cassegrain telescope and a soon-to-be-acquired new 16-inch reflector, all funded by private donations. The telescopes will be fitted with photometers, spectrometers, and digital and CCD cameras to pursue observations that would include sun spot and solar magnetic fields, planetary surfaces, asteroid search, variable stars and supernovae. The Center will be integrated with schools, colleges, and community groups for regular observation and small-scale research. Special educational and observing sessions for adults will also be organized. Updates on the development of the Center, which is expected to be functioning by the end of 2015, will be shared and feedback invited on the fostering of

  13. Pilot Projects in Water Management : Practicing Change and Changing Practice

    NARCIS (Netherlands)

    Vreugdenhil, H.S.I.

    2010-01-01

    Pilot projects are widely applied in water management. They can be used to test risky innovations at confined scale, but can also be used to delay policy decisions or to advocate a particular innovation. In this book the phenomenon ‘pilot project’ is explored both theoretically and empirically. A

  14. Connecticut warm mix asphalt (WMA) pilot projects 2010 and 2011.

    Science.gov (United States)

    2014-06-01

    WMA overlays were placed in several pilot projects in Connecticut during the 2010 and 2011 construction : seasons. These technologies included Sasobit, Evotherm, Advera, Double-Barrel Green foamed : asphalt as well as SonneWarmix. The res...

  15. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  16. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  17. Wind-To-Hydrogen Energy Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Ron Rebenitsch; Randall Bush; Allen Boushee; Brad G. Stevens; Kirk D. Williams; Jeremy Woeste; Ronda Peters; Keith Bennett

    2009-04-24

    WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the

  18. The Ukrainian pilot project “Stop radon”

    Directory of Open Access Journals (Sweden)

    Pavlenko Tatyana

    2014-01-01

    Full Text Available In 2010 one area of Ukraine (Kirovograd area was selected for a pilot project to reduce radon risks. The project consists of several stages: radon risk training for the public health professionals, measurements of radon concentration in schools and nurseries (more than 1000 buildings were examined, justifications of radon countermeasures and their implementation. The lognormal frequency distribution for equivalent equilibrium concentration was authentically established. The geometric mean of the indoor radon equivalent equilibrium concentration was established to 63 Bq/m3, and standard deviation is equal to 82 Bq/m3. The indoor radon equivalent equilibrium concentration ranged from 22 Bq/m3 to 809 Bq/m3. It was found that the national regulatory limit for this type of buildings was exceeded in more than 50% of the cases. The second phase of the project has a goal to remediate radon levels and reduce radon risks. Calculated exposure doses and radon risk were used to justify the remediation and assess the economic loss for the region caused by radon irradiation of the population.

  19. The World Center for Computing's Pilot Videodisc Project for French Language Instruction.

    Science.gov (United States)

    Eastmond, J. Nicholls, Jr.; Mosenthal, Richard

    1985-01-01

    Describes a pilot videodisc project for French language instruction. Unique features include (1) learner control of instruction by a mouse or touch-sensitive screen, (2) extensive cultural interaction, and (3) an elaborate lexicon of word meanings portrayed visually for selected key words. (Author/SED)

  20. Sampling strategy for a large scale indoor radiation survey - a pilot project

    International Nuclear Information System (INIS)

    Strand, T.; Stranden, E.

    1986-01-01

    Optimisation of a stratified random sampling strategy for large scale indoor radiation surveys is discussed. It is based on the results from a small scale pilot project where variances in dose rates within different categories of houses were assessed. By selecting a predetermined precision level for the mean dose rate in a given region, the number of measurements needed can be optimised. The results of a pilot project in Norway are presented together with the development of the final sampling strategy for a planned large scale survey. (author)

  1. Los Angeles County Metropolitan Transportation Authority climate change adaptation pilot project report.

    Science.gov (United States)

    2013-08-01

    This Climate Change Adaptation Pilot Project Report details the project background of the recently-completed Los Angeles County : Metropolitan Transportation Authority (Metro) Transit Climate Change Adaptation Pilot Project as well as the various wor...

  2. Workplace Literacy Pilot Projects: A Discussion Paper = Les Projects-pilotes en alphabetisation en milieu de travail: document de discussion.

    Science.gov (United States)

    de Wolff, Alice

    From 1995-1998, 12 of the 79 organizations funded by Canada's National Literacy Secretariat (NLS) conducted approximately 40 workplace literacy pilot projects across Canada. Those projects were reviewed to determine their effectiveness in increasing the number and quality of Canadian workplace literacy programs. Information for the review was…

  3. A Summary of the Technical Pilot Selection Literature

    Science.gov (United States)

    2011-10-01

    Thorndike -Kelly Athletic Interest Inventory ...............................................6 Developing Apparatus-based Pilot Selection Tests—Spring, 1917...chaired by H.E. Burtt, followed by G. Stratton, and finally by E.L. Thorndike (Yerkes, 1919). This committee also included John B. Watson, Warner...World War I was the Mental Alertness Test, which was developed by E.L. Thorndike . Thorndike (1919) realized that success as a military pilot required

  4. Next step in policy transitions: Diffusion of pilot projects

    CSIR Research Space (South Africa)

    Vreugdenhil, H

    2009-04-01

    Full Text Available communication across actors and domains, to set the agenda and to streamline resources (Pahl-Wostl, 2006, Pawson and Tilley, 1997). Social and policy learning are realized within the pilot projects. Social learning as one outcome of pilot project.... These ask for new approaches that are first to be tested on a small scale to prevent larger policy flaws and second, are designed to allow the system for remaining adaptable (Pahl-Wostl, 2006; Pawson and Tilley, 1997). Despite these promising...

  5. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  6. The NCI Digital Divide Pilot Projects: implications for cancer education.

    Science.gov (United States)

    Kreps, Gary L; Gustafson, David; Salovey, Peter; Perocchia, Rosemarie Slevin; Wilbright, Wayne; Bright, Mary Anne; Muha, Cathy

    2007-01-01

    The National Cancer Institute (NCI) supported four innovative demonstration research projects, "The Digital Divide Pilot Projects," to test new strategies for disseminating health information via computer to vulnerable consumers. These projects involved active research collaborations between the NCI's Cancer Information Service (CIS) and regional cancer control researchers to field test new approaches for enhancing cancer communication in vulnerable communities. The projects were able to use computers to successfully disseminate relevant cancer information to vulnerable populations. These demonstration research projects suggested effective new strategies for using communication technologies to educate underserved populations about cancer prevention, control, and care.

  7. Airlie House Pollution Prevention Technology Transfer pilot projects

    Energy Technology Data Exchange (ETDEWEB)

    Thuot, J.R.; Myron, H.; Gatrone, R.; McHenry, J.

    1996-08-01

    The projects were a series of pilot projects developed for DOE with the intention of transferring pollution prevention technology to private industry. The concept was to develop small technology transfer initiatives in partnership with the private sector. Argonne National Laboratory developed three projects: the microscale chemistry in education program, the microscale cost benefit study, and the Bethel New Life recycling trainee program. The two microscale chemistry projects focused on introducing microscale chemistry technologies to secondary and college education. These programs were inexpensive to develop and received excellent evaluations from participants and regulators. The recycle trainee project provided training for two participants and identified recycling and source reduction opportunities in Argonne`s solid waste stream. The pilot projects demonstrated that technology transfer initiatives can be developed and implemented with a small budget and within a short period of time. The essential components of the pilot projects were identification of target technologies that were already available, identification of target audiences, and a focus of effort to achieve a limited but defined objective.

  8. Reflections on a Coaching Pilot Project in Healthcare Settings

    Science.gov (United States)

    Gurbutt, D. J.; Gurbutt, R.

    2016-01-01

    This paper draws on personal reflection of coaching experiences and learning as a coach to consider the relevance of these approaches in a management context with a group of four healthcare staff who participated in a pilot coaching project. It explores their understanding of coaching techniques applied in management settings via their reflections…

  9. Influencing citizen behavior: experiences from multichannel marketing pilot projects

    NARCIS (Netherlands)

    van de Wijngaert, Lidwien; Pieterson, Willem Jan; Teerling, Marije L.

    2011-01-01

    Information technology allows national and local governments to satisfy the needs of citizens in a cost effective way. Unfortunately, citizens still tend to prefer traditional, more costly channels, such as the front desk, phone and mail. Through pilot projects government agencies attempt to

  10. Spiral model pilot project information model

    Science.gov (United States)

    1991-01-01

    The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

  11. Horse Palace photovoltaic pilot project findings report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-06-15

    This paper provided details of a solar photovoltaic (PV) feasibility study conducted as part of the Toronto Exhibition Place's 2010 energy self-sufficiency plan. The 100 kw plant was installed on the roof of the Horse Palace, and when first installed represented the largest urban PV array in Canada. The study was conducted to compare the performance of technology alternatives under otherwise common environmental and operating conditions, to build capacity to operate large roof-mounted PV systems in Toronto, and to gain experience with Ontario's renewable energy standard offer program (RESOP). The initial year of monitoring identified complications with inverters and monitoring equipment, shading issues, and problems with data collection and management. Interconnecting the project with the electricity grid to sell the produced power was a complicated and lengthy procedure. A problem with the baseline performance modeling that was used to assess the project was also identified. In 2008, the project produced 96,724 kWh. Simple payback for the project was estimated at 16.7 years. The plant is now participating in the RESOP and receiving monthly payments. 14 figs., 2 appendices.

  12. Manitoba Motor Dealers Association pilot project : final report

    International Nuclear Information System (INIS)

    2006-08-01

    This report described a 3-month pilot project conducted by EnerGuide for Vehicles in collaboration with the Manitoba Motor Dealers Association (MMDA) to increase dealership and consumer awareness of vehicle impacts on climate change. The project also aimed to engage MMDA's members in helping to promote and distribute information on fuel efficient vehicles and fuel efficient driving habits. Program tools in both the dealership showroom as well as service areas were used. Objectives of the project also included gaining public opinion research (POR) information regarding the impact of program tools; gaining feedback from new car dealers regarding the success of the project; gauging customer perceptions of the importance of fuel efficiency when selecting a new vehicle; determining whether or not drivers verify tire pressure on their vehicles; determining whether or not drivers incorporate energy efficient driving habits; and gauging customer perceptions regarding the importance of incorporating behaviours to improve fuel efficiency. The study used a mixed methodology of online and telephone surveys. A total of 41 dealerships participated in the project. The final sample of surveys consisted of 1926 customer records. The total overall number of completed interviews was 463. Results indicated that most dealers believed the campaign was a success, and that staff and customers learned about energy efficiency as a result of the campaign. Seventy-five per cent of dealers agreed that they would participate in future energy efficiency programs. Campaign materials and customer incentives were widely viewed as successful in raising awareness. Seven in 10 dealership customers recalled at least 1 of the promotional endeavours, and a large majority of customers indicated the information they saw at the dealership encouraged them to consider fuel efficiency when buying or maintaining a vehicle in the future. The majority of new customers considered fuel consumption to be the second

  13. Venus project : experimentation at ENEA's pilot site

    International Nuclear Information System (INIS)

    Bargellini, M.L.; Fontana, F.; Niccolai, L.; Scavino, G.; Mancini, R.; Levialdi, S.

    1996-12-01

    The document describes the ENEA's (Italian Agency for New Technologies, Energy and the Environment) experience in the Venus Project (Esprit III 6398). Venus is an advanced visual interface based on icon representation that permits to end-user to inquiry databases. VENUS interfaces to ENEA's databases: cometa materials Module, Cometa Laboratories Module and European Programs. This report contents the results of the experimentation and of the validation carried out in ENEA's related to the Venus generations. Moreover, the description of the architecture, the user requirements syntesis and the validation methodology of the VENUS systems have been included

  14. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  15. 77 FR 12312 - Electronic Submission of Nonclinical Study Data; Notice of Pilot Project

    Science.gov (United States)

    2012-02-29

    ...] Electronic Submission of Nonclinical Study Data; Notice of Pilot Project AGENCY: Food and Drug Administration... and Research (CBER) is announcing an invitation to participate in a pilot evaluation program to test.... Participation in the pilot program is open to all sponsors. The pilot program is intended to provide industry...

  16. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  17. Recycling entire DOE facilities: The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Floyd, D.R.

    1996-01-01

    The Mission of the National Conversion Pilot Project - to demonstrate, at the Rocky Flats Site, the feasibility of economic conversion of DOE Sites - is succeeding. Contaminated facilities worth $92 million are being cleaned and readied for reuse by commercial industry to manufacture products needed in the DOE cleanup and elsewhere. Former Rocky Flats workers have been hired, recultured, are conducting the cleanup and are expected to perform the future manufacturing by recycling DOE RSM and other metals requiring special environmental controls. Stakeholder sway over project activities is welcome and strong

  18. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  19. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  20. Oregon department of transportation small business group twice-monthly payments pilot project : summary report.

    Science.gov (United States)

    2008-07-01

    Oregon Department of Transportation (ODOT) recently completed a pilot study on small business payment practices. In the study, three pilot projects were tested where payments to small business contractors were changed from a monthly payment to twice-...

  1. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  2. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  3. National conversion pilot project: A creative approach to recyling

    International Nuclear Information System (INIS)

    Gandee, K.R.; Taylor, R.A.; Cornils, K.N.

    1995-01-01

    As a result of the Bush-Yeltsin summit in 1991, the U.S. Department of Energy (DOE) has undergone a significant downsizing of its defense mission. In July 1992, the Rocky Flats site in Colorado was the first DOE site to be closed. Its mission was changed from defense to environmental cleanup and economic development. Recognizing the need to assist displaced workers and affected communities and to conduct cost-effective cleanup of DOE sites, Congress initiated two legislative provisions in the 1994 National Defense Authorization Act that required DOE to (a) provide local impact assistance to communities that are affected by the defense downsizing and (b) conduct at least One waste recycling project within the 1994 fiscal year. At the Rocky Flats site, the National Conversion Pilot Project represents an innovative approach in which both Congressional requirements are achieved simultaneously, and the strategy for meeting these requirements was developed through the active participation of all stakeholders of the project

  4. Nuclear employee data system (NEDS), a pilot project

    International Nuclear Information System (INIS)

    Britz, W.L.

    1984-01-01

    This paper describes a pilot project being funded by six east coast nuclear utilities: the Nuclear Employee Data System (NEDS). The NEDS is to be a customized computer-based information management system that will receive, update, and maintain in-processing information among the NEDS participating utilities. A comprehensive set of data requirements has been preliminarily identified and characterized into areas of: personal information, security information, health physics information, respiratory protective equipment information, medical information, and training information. The NEDS is expected to become operational next summer

  5. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  6. Early screening for dyslexia--a collaborative pilot project.

    Science.gov (United States)

    Ball, S; Becker, T; Boys, M; Davies, S; Noton, H

    2001-01-01

    An ongoing collaborative project, currently being piloted in 12 Wiltshire primary schools, is described. The aim is to provide a means of identifying potentially dyslexic children by the end of Key Stage 1 (Year 2) with a view to early intervention. The causal links identified by research between phonological skills and literacy development are taken as the theoretical basis of an initial screening procedure, and an intervention package is implemented for identified children. Those demonstrating persistent difficulties one year later are further assessed over a school term using an assessment package designed to identify those children showing a dyslexic profile. Further intervention is then planned and implemented.

  7. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  8. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  9. Macroalgae for CO2 Capture and Renewable Energy - A Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Wiley, Kristine [Gas Technology Inst., Des Plaines, IL (United States)

    2011-01-31

    The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO2) through a technology designed to capture CO2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO2/ NOx flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing

  10. A pilot project: Antioch Delta Cove, Antioch, California

    International Nuclear Information System (INIS)

    Minder, M.

    1994-01-01

    The project involves the restoration of the Hickmott cannery site, comprising approximately 15 acres (three five acre parcels) located on the Delta in inter-city Antioch. Hickmott Foods, Inc., operated a fruit and vegetable cannery between 1905 and the early 1970's, during which time tomato skins, peach and apricot pits, and asparagus butts were discharged on the site. The decaying fruit pits have caused cyanide contamination. Additionally, the site contains some petroleum hydrocarbon contamination as well as gypsum board contamination, apparently from nearby manufacturing operations. The Antioch Delta Cove Pilot shows how interested parties can work together to clean up contaminated sites and use the clean up process to stimulate technology transfer. The Antioch project is a blueprint that can be replicated at other sites across California

  11. The Fermilab ISDN Pilot Project: Experiences and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  12. The Fermilab ISDN Pilot Project: Experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking

  13. The Fermilab ISDN pilot project: experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1996-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. each home was equipped with a basic rate ISDN (BRI) Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking. (author)

  14. Statistical projection effects in a hydrodynamic pilot-wave system

    Science.gov (United States)

    Sáenz, Pedro J.; Cristea-Platon, Tudor; Bush, John W. M.

    2018-03-01

    Millimetric liquid droplets can walk across the surface of a vibrating fluid bath, self-propelled through a resonant interaction with their own guiding or `pilot' wave fields. These walking droplets, or `walkers', exhibit several features previously thought to be peculiar to the microscopic, quantum realm. In particular, walkers confined to circular corrals manifest a wave-like statistical behaviour reminiscent of that of electrons in quantum corrals. Here we demonstrate that localized topological inhomogeneities in an elliptical corral may lead to resonant projection effects in the walker's statistics similar to those reported in quantum corrals. Specifically, we show that a submerged circular well may drive the walker to excite specific eigenmodes in the bath that result in drastic changes in the particle's statistical behaviour. The well tends to attract the walker, leading to a local peak in the walker's position histogram. By placing the well at one of the foci, a mode with maxima near the foci is preferentially excited, leading to a projection effect in the walker's position histogram towards the empty focus, an effect strongly reminiscent of the quantum mirage. Finally, we demonstrate that the mean pilot-wave field has the same form as the histogram describing the walker's statistics.

  15. Pilot project - Promoting protection of the right to housing

    DEFF Research Database (Denmark)

    This study was undertaken for the European Commission Directorate-General for Employment, Social Affairs & Inclusion as part of the ‘Promoting protection of the right to housing - Homelessness prevention in the context of evictions’ pilot project. The key objectives of the research were: - to pro......This study was undertaken for the European Commission Directorate-General for Employment, Social Affairs & Inclusion as part of the ‘Promoting protection of the right to housing - Homelessness prevention in the context of evictions’ pilot project. The key objectives of the research were......: - to provide an overview and analysis of available data and trends regarding housing evictions between 2010 and 2013 across the 28 EU Member States; - to establish the reasons for and impacts of eviction, in particular the relative importance of eviction as a pathway into homelessness; - to analyse...... the legislative and regulatory framework and the availability, effectiveness and cost-efficiency of measures designed to prevent and tackle evictions and enable early interventions; - to suggest ways to improve data collection and the monitoring of evictions in the Member States, identifying the most important...

  16. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Science.gov (United States)

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... motor carriers that applied to participate in the Agency's long-haul pilot program to test and... intent to proceed with the initiation of a United States- Mexico cross-border long-haul trucking pilot...

  17. Advanced Engineering Environment FY09/10 pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  18. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  19. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  20. [Evaluation of 12 pilot projects to improve outpatient palliative care].

    Science.gov (United States)

    Schmidt-Wolf, G; Elsner, F; Lindena, G; Hilgers, R-D; Heussen, N; Rolke, R; Ostgathe, C; Radbruch, L

    2013-12-01

    With a priority programme the German Cancer Aid supported the development of quality-assured outpatient palliative care to cover the whole country. The 12 regional pilot projects funded with the aim to improve outpatient palliative care in different models and different frameworks were concurrently monitored and evaluated. The supported projects, starting and ending individually, documented all patients who were cared for using HOPE (Hospice and palliative care evaluation) and MIDOS (Minimal documentation system for palliative patients). Total data were analyzed for 3239 patients decriptively. In addition to the quantitative data the experiences of the projects were recorded in a number of workshops (2008, 2009, 2010, and 2012). In particular, the experiences reported in the final meeting in July 2012 were considered for this article as well as the final reports for the German Cancer Aid. In the quantitative evaluation 85.6% of 3239 palliative care patients had a cancer diagnosis. In all model projects the goal of a network with close cooperation of primary providers, social support, and outpatient and inpatient specialist services has been achieved. For all projects, the initial financing of the German Cancer Aid was extremely important, because contracts with health insurance funds were negotiated slowly, and could then be built on the experiences with the projects. The participants of the project-completion meeting emphasized the need to carry out a market analysis before starting palliative care organizations considering the different regional structures and target groups of patients. Education, training and continuing education programs contribute significantly to the network. A reliably funded coordination center/case management across all institutions is extremely important. © Georg Thieme Verlag KG Stuttgart · New York.

  1. Overview of NASA's Carbon Monitoring System Flux-Pilot Project

    Science.gov (United States)

    Pawson, Steven; Gunson, Michael R.; Jucks, Kenneth

    2011-01-01

    NASA's space-based observations of physical, chemical and biological parameters in the Earth System along with state-of-the-art modeling capabilities provide unique capabilities for analyses of the carbon cycle. The Carbon Monitoring System is developing an exploratory framework for detecting carbon in the environment and its changes, with a view towards contributing to national and international monitoring activities. The Flux-Pilot Project aims to provide a unified view of land-atmosphere and ocean-atmosphere carbon exchange, using observation-constrained models. Central to the project is the application of NASA's satellite observations (especially MODIS), the ACOS retrievals of the JAXA-GOSAT observations, and the "MERRA" meteorological reanalysis produced with GEOS-S. With a primary objective of estimating uncertainty in computed fluxes, two land- and two ocean-systems are run for 2009-2010 and compared with existing flux estimates. An transport model is used to evaluate simulated CO2 concentrations with in-situ and space-based observations, in order to assess the realism of the fluxes and how uncertainties in fluxes propagate into atmospheric concentrations that can be more readily evaluated. Finally, the atmospheric partial CO2 columns observed from space are inverted to give new estimates of surface fluxes, which are evaluated using the bottom-up estimates and independent datasets. The focus of this presentation will be on the science goals and current achievements of the pilot project, with emphasis on how policy-relevant questions help focus the scientific direction. Examples include the issue of what spatio-temporal resolution of fluxes can be detected from polar-orbiting satellites and whether it is possible to use space-based observations to separate contributions to atmospheric concentrations of (say) fossil-fuel and biological activity

  2. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  3. Streaking into middle school science: The Dell Streak pilot project

    Science.gov (United States)

    Austin, Susan Eudy

    A case study is conducted implementing the Dell Streak seven-inch android device into eighth grade science classes of one teacher in a rural middle school in the Piedmont region of North Carolina. The purpose of the study is to determine if the use of the Dell Streaks would increase student achievement on standardized subject testing, if the Streak could be used as an effective instructional tool, and if it could be considered an effective instructional resource for reviewing and preparing for the science assessments. A mixed method research design was used for the study to analyze both quantitative and qualitative results to determine if the Dell Streaks' utilization could achieve the following: 1. instructional strategies would change, 2. it would be an effective instructional tool, and 3. a comparison of the students' test scores and benchmark assessments' scores would provide statistically significant difference. Through the use of an ANOVA it was determined a statistically significant difference had occurred. A Post Hoc analysis was conducted to identify where the difference occurred. Finally a T-test determined was there was no statistically significance difference between the mean End-of-Grade tests and four quarterly benchmark scores of the control and the experimental groups. Qualitative research methods were used to gather results to determine if the Streaks were an effective instructional tool. Classroom observations identified that the teacher's teaching styles and new instructional strategies were implemented throughout the pilot project. Students had an opportunity to complete a questionnaire three times during the pilot project. Results revealed what the students liked about using the devices and the challenges they were facing. The teacher completed a reflective questionnaire throughout the pilot project and offered valuable reflections about the use of the devices in an educational setting. The reflection data supporting the case study was drawn

  4. Condensed listing of surface boreholes at the Waste Isolation Pilot Plant Project through 31 December 1995

    International Nuclear Information System (INIS)

    Hill, L.R.; Aguilar, R.; Mercer, J.W.; Newman, G.

    1997-01-01

    This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreholes drilled for the purpose of site selection and characterization through 31 December 1995. The US Department of Energy (DOE) sponsored the drilling activities, which were conducted primarily by Sandia National Laboratories. The listing provides physical attributes such as location (township, range, section, and state-plane coordinates), elevation, and total borehole depth, as well as the purpose for the borehole, drilling dates, and information about extracted cores. The report also presents the hole status (plugged, testing, monitoring, etc.) and includes salient findings and references. Maps with borehole locations and times-of-drilling charts are included

  5. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  6. Execution of pilot tests for an uranium in situ leaching project

    International Nuclear Information System (INIS)

    Koch, H.J.

    1983-01-01

    Urangesellschaft is presently evaluating the technical and economic feasibility of an in situ leaching (ISL) project in Wyoming/USA. This report describes the basic technical principles for ISL-uranium projects and gives the reasons for conducting pilot tests prior to the construction of a commercial plant. It further describes the licensing requirements for an ISL-pilot plant and evaluates the results of the pilot tests. (orig.) [de

  7. Grouts and concretes for the Waste Isolation Pilot Project (WIPP)

    International Nuclear Information System (INIS)

    Wakeley, L.D.

    1990-01-01

    The Structures Laboratory of the U.S. Army Engineer Waterways Experiment Station has conducted research on cement-based composites for the Waste Isolation Pilot Project (WIPP) since 1977, in cooperation with Sandia National Laboratories. Field testing requirements guided initial development of grouts. Concurrent and later laboratory studies explored the chemical stability and probable durability of these mixtures. Beginning in 1985, a series of small-scale seal performance tests at the WIPP prompted development of an expansive salt-saturated concrete. Important lessons learned from this ongoing work include: (1) carefully tailored mixtures can tolerate phase changes involving Ca, Al, and SO 4 , without loss of structural integrity; (2) handling and placement properties are probably more crucial to the mixtures than is exact phase composition; and (3) for the environment of a geologic repository, demonstrated chemical durability will be the best indicator of long-term performance

  8. Handheld computers in nursing education: PDA pilot project.

    Science.gov (United States)

    Koeniger-Donohue, Rebecca

    2008-02-01

    Interest in the use and application of handheld technology at undergraduate and graduate nursing programs across the country is growing rapidly. Personal digital assistants (PDAs) are often referred to as a "peripheral brain" because they can save time, decrease errors, and simplify information retrieval at the point of care. In addition, research results support the notion that PDAs enhance nursing clinical education and are an effective student learning resource. However, most nursing programs lack the full range of technological resources to implement and provide ongoing support for handheld technology use by faculty and students. This article describes a 9-month pilot project for the initial use of PDAs by novice faculty and students at Simmons College.

  9. The photovoltaic pilot projects of the European Community

    Science.gov (United States)

    Schnell, W.

    The Commission of the European Communities has started in 1980 a programme for the design and construction of a series of photovoltaic pilot projects in the range of 30-300 kWp. Virtually all important industries and other development organisations in Europe working on photovoltaic cells and systems are involved in this programme. The different technologies which are being developed concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of an island, villages, recreation centres, water desalination and disinfection, powering of radio transmitters, emergency power plants, dairy farm, training school, cooling, water pumping, powering of a solar heated swimming pool and last but not least, hydrogen production.

  10. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  11. Washington State Need Grant: Less-Than-Halftime Pilot Project (SHB 1345)

    Science.gov (United States)

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    The 2005 Washington State Legislature authorized, through Substitute House Bill 1345, a two-year pilot project allowing eligible students, who enroll for four or five credits in a term, to receive the State Need Grant (SNG). Several important policy considerations emerged during the pilot project. Board staff explored these issues with financial…

  12. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  13. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  14. Objective Versus Subjective Military Pilot Selection Methods in the United States of America

    Science.gov (United States)

    2015-12-14

    a computerized test designed to assess pilot skills by measuring spatial orientation and psychomotor skills and multitasking . The second is the...AFRL-SA-WP-SR-2015-0028 Objective Versus Subjective Military Pilot Selection Methods in the United States of America Joe...September 2014 4. TITLE AND SUBTITLE Objective Versus Subjective Military Pilot Selection Methods in the United States of America 5a. CONTRACT

  15. Computer Hardware, Advanced Mathematics and Model Physics pilot project final report

    International Nuclear Information System (INIS)

    1992-05-01

    The Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) Program was launched in January, 1990. A principal objective of the program has been to utilize the emerging capabilities of massively parallel scientific computers in the challenge of regional scale predictions of decade-to-century climate change. CHAMMP has already demonstrated the feasibility of achieving a 10,000 fold increase in computational throughput for climate modeling in this decade. What we have also recognized, however, is the need for new algorithms and computer software to capitalize on the radically new computing architectures. This report describes the pilot CHAMMP projects at the DOE National Laboratories and the National Center for Atmospheric Research (NCAR). The pilot projects were selected to identify the principal challenges to CHAMMP and to entrain new scientific computing expertise. The success of some of these projects has aided in the definition of the CHAMMP scientific plan. Many of the papers in this report have been or will be submitted for publication in the open literature. Readers are urged to consult with the authors directly for questions or comments about their papers

  16. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  17. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  18. JS3P: junior staff programme pilot project

    International Nuclear Information System (INIS)

    Pretrel, H.; Tregoures, N.; Bessiron, V.; Dehoyos, A.; Delvallee, I.; Brisson, N.; Debayle, C.; Dubreuil, M.; Nicaise, G.; Perignon, J.P.; Richard, J.; Reinke, N.; Kaulard, J.; Burgener, M.; Keesmann, S.; Schramm, B.; Seubert, A.; Sternkopf, J.; Thuma, G.; Weber, S.; Smidts, O.; Maillet, E.; Bucalossi, A.; Van haesendonck, M.; Uyttenhove, W.; Mertens, J.

    2006-01-01

    Concept: The objective of the project is to allow junior staff members from the European Technical Safety Organisations (TSOs), IRSN, GRS and AVN, to work together with the final goal of creating a junior staff network, based on technical, cultural and personal interests. These projects are to show junior staff members at a very early stage during their career the need for European collaborations. They are also a tool to explore new subjects of co-operation. It is an initiative that should strengthen the links between the organisations and contribute to establishing the future of nuclear safety in Europe. A JS3P (Junior Staff Programme Pilot Project) is a project done jointly by 'junior' staff members from the three TSOs, where experience of 'seniors' is also integrated when needed. Compared to other collaborative activities, it has certain specific features. The JS3P favours staff exchanges, and technical meetings of several days should be planned during a project in order to encourage people to work together. Technical objectives are shared and the work is done jointly (reports, articles). The team involved in the JS3P should be as small as possible to favour its efficiency. The JS3P is short and easy to realize. Its duration is fixed to a maximum of about 12 months with the option to be prolonged. Typical topics are bibliographic work, comparison issues, scientific surveys, benchmark exercises and prospective investigations on innovative ideas. They can be linked to existing joint projects and then form a smaller module integrated into the large project. Topics may concern prospective issues, tentatively investigating new topics that can be seen as exploratory co-operation projects. Subjects may also concern research issues that are not a priority but that deserve to be investigated as new attractive topics. The JS3P is defined and managed by junior staff members. It is approved by a management board committee and supervised by a technical steering committee

  19. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  20. 78 FR 35961 - Pilot Project for Tribal Jurisdiction Over Crimes of Domestic Violence

    Science.gov (United States)

    2013-06-14

    ...This notice proposes procedures for an Indian tribe to request designation as a participating tribe under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, pursuant to the voluntary pilot project described in section 908(b)(2) of the Violence Against Women Reauthorization Act of 2013 (``the Pilot Project''), and also proposes procedures for the Attorney General to act on such a request. This notice also invites public comment on the proposed procedures and solicits preliminary expressions of interest from tribes that may wish to participate in the Pilot Project.

  1. The waste isolation pilot plant project: a changing paradigm

    International Nuclear Information System (INIS)

    Sheppard, L.E.; McFadden, M.H.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) repository that has been developed to demonstrate the safe and permanent isolation of transuranic radioactive wastes in a deep geologic site. It is located in 650 m below the surface in a bedded salt formation, and is designed to hold approximately 175,500 cubic meters of waste. Compliance with the regulations has become the principal focus for the Project. The scientific baseline is an important and integral part of the CCA, as it provides the foundation for conducting total system performance assessment calculations for comparison with applicable standards. The activities required to support the scientific baseline are being pursued in parallel to minimize the time required to collect, analyze, interpret and fully incorporate the results into the CCA. The DOE has shifted its approach to demonstrating compliance with the applicable regulations from a paradigm of a series of broad investigations to a new paradigm of highly focused activities conducted in parallel. The success of this approach will be assessed by the EPA when the application is critically reviewed

  2. Strategizing Carbon-Neutral Mines: A Case for Pilot Projects

    Directory of Open Access Journals (Sweden)

    Ian M. Power

    2014-05-01

    Full Text Available Ultramafic and mafic mine tailings are a valuable feedstock for carbon mineralization that should be used to offset carbon emissions generated by the mining industry. Although passive carbonation is occurring at the abandoned Clinton Creek asbestos mine, and the active Diavik diamond and Mount Keith nickel mines, there remains untapped potential for sequestering CO2 within these mine wastes. There is the potential to accelerate carbonation to create economically viable, large-scale CO2 fixation technologies that can operate at near-surface temperature and atmospheric pressure. We review several relevant acceleration strategies including: bioleaching of magnesium silicates; increasing the supply of CO2 via heterotrophic oxidation of waste organics; and biologically induced carbonate precipitation, as well as enhancing passive carbonation through tailings management practices and use of CO2 point sources. Scenarios for pilot scale projects are proposed with the aim of moving towards carbon-neutral mines. A financial incentive is necessary to encourage the development of these strategies. We recommend the use of a dynamic real options pricing approach, instead of traditional discounted cash-flow approaches, because it reflects the inherent value in managerial flexibility to adapt and capitalize on favorable future opportunities in the highly volatile carbon market.

  3. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  4. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    Science.gov (United States)

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  5. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  6. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  7. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  8. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  9. Future energy research in the EU under EIT conditions-pilot projects

    Energy Technology Data Exchange (ETDEWEB)

    Puehringer-Oppermann, Franziska; Bele, Petra; Bussar, Rainer; Stimming, Ulrich [TUM, Dept. of Physics, E19, James-Franck Str. 1, D-85748 Garching (Germany)

    2009-07-01

    The European Institute of Innovation and Technology (EIT) has been established in April 2008. It is an independent organisation with the administrative head in Budapest, a governing board, an executive committee and a chairman. The EIT budget until 2012 is 308 MEUR. EIT will operate through the formation of Knowledge and Innovation Communities (KICs). The first three KICs are foreseen in the areas sustainable energy, ICT and climate mitigation. The European Commission has sponsored four pilot projects (conducted 2008-2009) to help develop a suitable governance structure for cooperations on European scale such as the future KICs. They are Bridge, ComplexEIT, SUCCESS and Gast, dealing with different topics like nanomedicine (Bridge), integration of hardware and software (ComplexEIT), sustainable energy (SUCCESS) and green and safe road transportation (Gast). The strategic objective of these pilot projects is to design, implement and test new models of cooperation in the knowledge triangle. We are involved in SUCCESS and after benchmarking of 66 collaborations in the field sustainable energy, the state of the art of selected representative topics was asessed and shortcomings in governance evaluated by SWOT analysis. In parallel further existing collaborations were used to extract and establish a management structure for such collaborations on the European scale.

  10. An interim report on the MCAT Essay Pilot Project.

    Science.gov (United States)

    Koenig, J A; Mitchell, K J

    1988-01-01

    Results from four pilot administrations of the Medical College Admission Test essay question are reported. Analyses focused on (a) the performance characteristics of sample groups differentiated by gender, size of hometown, race/ethnicity, and dominant language; (b) the relationships between essay scores and academic/demographic characteristics; and (c) the reliability of one 45-minute versus two 30-minute essays. No differences were found for examinees grouped by gender and size of home community. Mean differences among the racial/ethnic groups were explained largely by reading level differences. Differences in essay performance by language group were large and unexplained by reading level differences. No relationship was found between the essay score and the academic/demographic characteristics. Reliability estimates for two 30-minute essays were higher than for one 45-minute essay; however, the 30-minute period yielded writing of poorer quality. Test-retest reliabilities for the 45-minute topics will remain the focus of future studies as will performance by examinees for whom English is a second language. The impact of the essay on the selection process will also be assessed.

  11. Testing the HTA core model: experiences from two pilot projects

    DEFF Research Database (Denmark)

    Pasternack, Iris; Anttila, Heidi; Mäkelä, Marjukka

    2009-01-01

    OBJECTIVES: The aim of this study was to analyze and describe process and outcomes of two pilot assessments based on the HTA Core Model, discuss the applicability of the model, and explore areas of development. METHODS: Data were gathered from HTA Core Model and pilot Core HTA documents, their va...

  12. Alberta Learning: Early Development Instrument Pilot Project Evaluation.

    Science.gov (United States)

    Meaney, Wanda; Harris-Lorenze, Elayne

    The Early Development Instrument (EDI) was designed by McMaster University to measure the outcomes of childrens early years as they influence their readiness to learn at school. The EDI was piloted in several Canadian cities in recent years through two national initiatives. Building on these initiatives, Alberta Learning piloted the EDI as a…

  13. PROJECT MANAGEMENT MATURITY: AN ASSESSMENT OF MATURITY FOR DEVELOPING PILOT PLANTS

    Directory of Open Access Journals (Sweden)

    H.K. Mittermaier

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Despite the current economic climate, the South African mining and engineering industry is experiencing a very promising future, with a large number of capital projects in the offing. It is inevitable that pilot plant development will form part of this future as a risk mitigation technique. This study found that, even though the terms ‘pilot plant’ and ‘project management maturity’ are familiar within the industry, no link between these two could be found in the literature. A number of maturity models exist; and one developed by PMSolutions was selected to perform an assessment of the current level of project management maturity within the South African mining and engineering industry pertaining to the development of pilot plants. The Delphi technique was used to determine the views of experts in the South African mining, mineral processing, petrochemical, nuclear, and mechanical sectors regarding this maturity. A significant difference was observed between the current level of maturity and the required level of maturity in all but one of the nine knowledge areas defined by the Project Management Institute. The two knowledge areas of project time and risk management showed significant differences between current and required maturity levels, and were identified as key areas for improvement.

    AFRIKAANSE OPSOMMING: Ten spyte van die huidige ekonomiese klimaat ondervind die Suid-Afrikaanse mynbou- en ingenieursbedryf ’n baie bemoedigende toekoms, met ’n groot aantal kapitaalprojekte in die vooruitsig. Ten einde risiko’s te verlaag, sal die ontwikkeling van loodsaanlegte noodwendig deel van hierdie toekoms uitmaak. Daar is gevind dat, alhoewel die terme ‘loodsaanleg’ en ‘projekbestuur volwassenheid’ in die nywerheid bekend is, geen skakeling van hierdie twee terme in die literatuur opgespoor kon word nie. ’n Aantal volwassenheid modelle bestaan; en een wat deur PMSolutions ontwikkel is, is gekies om

  14. The Namibia Early Flood Warning System, A CEOS Pilot Project

    Science.gov (United States)

    Mandl, Daniel; Frye, Stuart; Cappelaere, Pat; Sohlberg, Robert; Handy, Matthew; Grossman, Robert

    2012-01-01

    Over the past year few years, an international collaboration has developed a pilot project under the auspices of Committee on Earth Observation Satellite (CEOS) Disasters team. The overall team consists of civilian satellite agencies. For this pilot effort, the development team consists of NASA, Canadian Space Agency, Univ. of Maryland, Univ. of Colorado, Univ. of Oklahoma, Ukraine Space Research Institute and Joint Research Center(JRC) for European Commission. This development team collaborates with regional , national and international agencies to deliver end-to-end disaster coverage. In particular, the team in collaborating on this effort with the Namibia Department of Hydrology to begin in Namibia . However, the ultimate goal is to expand the functionality to provide early warning over the South Africa region. The initial collaboration was initiated by United Nations Office of Outer Space Affairs and CEOS Working Group for Information Systems and Services (WGISS). The initial driver was to demonstrate international interoperability using various space agency sensors and models along with regional in-situ ground sensors. In 2010, the team created a preliminary semi-manual system to demonstrate moving and combining key data streams and delivering the data to the Namibia Department of Hydrology during their flood season which typically is January through April. In this pilot, a variety of moderate resolution and high resolution satellite flood imagery was rapidly delivered and used in conjunction with flood predictive models in Namibia. This was collected in conjunction with ground measurements and was used to examine how to create a customized flood early warning system. During the first year, the team made use of SensorWeb technology to gather various sensor data which was used to monitor flood waves traveling down basins originating in Angola, but eventually flooding villages in Namibia. The team made use of standardized interfaces such as those articulated

  15. Enhanced neurorehabilitation techniques in the DVBIC Assisted Living Pilot Project.

    Science.gov (United States)

    Hoffman, Stuart W; Shesko, Kristina; Harrison, Catherine R

    2010-01-01

    Traumatic Brain Injury has been labeled the "silent epidemic" in our current wars. Both CBO and the RAND reports predict that the costs of these injuries will be both extensive and enduring. The projected costs are based not only upon the loss contribution of these warriors to our economy, but also the long-term medical and assistive care that will be needed to support these veterans for decades to come. Thus, the primary goal of the Assisted Living Pilot Project (ALPP) at the Defense and Veterans Brain Injury Center - Johnstown (DVBIC-J) is to promote the ability of the injured warrior to move from assisted living to living independently and to be self-supporting by providing a continuum of care. To accomplish this goal the DVBIC-J ALPP is providing full set of traditional services (physical, occupational, speech, psychological/cognitive, social/familial, vocational, and spiritual), along with "cutting-edge" rehabilitative treatment technologies. These cutting-edge therapies include transdisciplinary clinical consultations, interactive patient and family counseling, and telemedicine-teleconferencing for clinical evaluations and family/significant other care participation. These services will be available to those who require assisted living through their progression to community re-entry. The ALPP also serves as a vehicle for clinical trials to investigate the effects of an enriched environment (e.g., recreational therapies, massage, multisensory stimulation, etc.) on neurorehabilitation therapy, rural telemedicine for servicemembers with traumatic brain injury, and long-term outcome measures of those who have received neurorehabilitation services at the DVBIC-J site. DVBIC-J is also developing collaborative projects with universities and private industry to create an incubator for new rehabilitation technologies. The technologies that DVBIC-J will be focusing on will include assistive technologies (to assist cognitive, physical, and communicative impairments

  16. Simplified pilot module development and testing within the ATLAS PanDA Pilot 2.0 Project

    CERN Document Server

    Drizhuk, Daniil; The ATLAS collaboration; Nilsson, Paul

    2016-01-01

    The Production and Distributed Analysis (PanDA) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at the LHC data processing scale. The PanDA pilot is one of the major components in the PanDA system. It runs on a worker node and takes care of setting up the environment, fetching and pushing data to storage, getting jobs from the PanDA server and executing them. The original PanDA Pilot was designed over 10 years ago and has since then grown organically. Large parts of the original pilot code base are now getting old and are difficult to maintain. Incremental changes and refactoring have been pushed to the limit, and the time is now right for a fresh start, informed by a decade of experience, with the PanDA Pilot 2.0 Project. To create a testing environment for module development and automated unit and functional testing for next generation pilot tasks, a simple pilot version was developed. It resembles the basic workf...

  17. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  18. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  19. Pilot project for implantation of the National Commission on Radiation Protection and Dosimetry of CONTER, Brazil

    International Nuclear Information System (INIS)

    Padilha Filho, L.G.; Santos, J.R.A.; Dmitruk, P.P.; Souza, J.H.C.; Hamann, J.H.; Soboll, D.S.

    2017-01-01

    This work presents the pilot project of the National Council of Technicians and Technologists in Radiology (CONTER), which created the National Commission on Radioprotection and Dosimetry (CNRD), in order to develop a radioprotection culture for professionals in radiographic techniques

  20. Smart city pilot projects, scaling up or fading out? : Experiences from Amsterdam

    NARCIS (Netherlands)

    van Winden, W.

    2016-01-01

    In many cities, pilot projects are set up to test or develop new technologies that improve sustainability, urban quality of life or urban services (often labelled as “smart city” projects). Typically, these projects are supported by the municipality, funded by subsidies, and run in partnerships.

  1. Smart City pilot projects : exploring the dimensions and conditions of scaling up

    NARCIS (Netherlands)

    van Winden, W.; van den Buuse, D.J.H.M.

    2017-01-01

    In many cities, pilot projects are set up to test new technologies that help to address urban sustainability issues, improve the effectiveness of urban services, and enhance the quality of life of citizens. These projects, often labelled as “smart city” projects, are typically supported by

  2. Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report

    International Nuclear Information System (INIS)

    Johansen, R.

    2011-01-01

    Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

  3. Evaluation of transversal competencies: pilot project in a maths course for first-year business

    OpenAIRE

    Bosch Príncep, Manuela; Morillo, Isabel

    2013-01-01

    The aim of this communication is to describe the results of a pilot project for the assessment of the transversal competency "the capacity for learning and responsibility". This competency is centred on the capacity for the analysis, synthesis, overview, and practical application of newly acquired knowledge. It is proposed by the University of Barcelona in its undergraduate degree courses, through multidisciplinary teaching teams. The goal of the pilot project is to evaluate this competenc...

  4. Pilot projects and nation-wide immunization in India.

    Science.gov (United States)

    Haxton, D

    1984-01-01

    These studies identify possibilities for expanding immunization coverage in India and show that there have been positive experiences in going to scale with immunizationation at the district level. Reasons for success are discussed. The promotion of social awareness and participation through all available channels is of central importance. Continuing attention should be directed to vaccine supply and distribution systems, program management and manpower training, especially at the community level. There are many opportunities for extending involvement in immunization efforts and broad-spectrum programs beyond the confines of the health system, and for flexibility in program organization. Planning must incorporate political commitment as well as the provision of adequate financial resources. India launched the Expanded Program on Immunization (EPI) in 1978. 6 diseases are currently on the official schedule for progressive nation-wide immunization: tuberculosis, poliomyelitis, whooping cough, diptheria, tetanus and typhoid. The experiences of 3 efforts in Dewas, in Bidar, (2 rural areas), and in Delhi (an urban area) are covered. Immunization coverage before the intensive efforts did not exceed 30%. Major elements of program organization were: nonhealth sector political and administrative involvement from the state; multisectoral planning committees at different levels; household surveys to identify children to be immunized; training sessions for each category of workers; and strengthening the cold chain. Factors in operational design and implementation include: vaccination posts in the community; selection of acceptable vaccination days; reminders the day before vaccination; collection of children; immunization cards as a device for informing about next round; counteraction of side-effects; follow-up of drop-outs; monitoring for corrective action involving all participants; and formal evaluation by local medical colleges. Intensive immunization in the 3 pilot sites

  5. Poverty Reduction in India through Palliative Care: A Pilot Project.

    Science.gov (United States)

    Ratcliff, Cathy; Thyle, Ann; Duomai, Savita; Manak, Manju

    2017-01-01

    EMMS International and Emmanuel Hospital Association (EHA) implemented a pilot project, poverty reduction in India through palliative care (PRIPCare). A total of 129 interviews with patients and family enrolled in palliative care at three EHA hospitals (in Fatehpur, Lalitpur and Utraula) and staff discussions established that 66% of palliative care patients had lost livelihoods due to illness, 26% of patients' families had members who had lost livelihoods due to the illness, 98% of enrolled households had debts, 59% had loans for which they had sold assets, 69% of households took out debt after their family member fell ill, many patients do not know about government benefits and lack necessary documents, many village headmen require bribes to give people access to benefits, and many bereaved women and children lose everything. Palliative care enabled 85% of patients and families to spend less on medicines, 31% of patients received free medicines, all patients reduced use of out-patient departments (OPDs), 20% reduced use of inpatient departments (IPDs), and therefore spent less on travel, 8% of patients had started earning again due to improved health, members of 10% of families started earning again, and one hospital educated 171 village headmen and increased by 5% the number of patients and their families receiving government benefits. If only 0.7% of needy adults are receiving palliative care, these benefits could be delivered to 143 times more families, targeted effectively at poverty reduction. Palliative care has great scope to reduce that most desperate poverty in India caused by chronic illness. This article concerns a study by the UK NGO EMMS International and Indian NGO EHA, to assess whether palliative care reduces household poverty. EHA staff had noticed that many patients spend a lot on ineffective treatment before joining palliative care, many families do not know their entitlement to government healthcare subsidies or government pensions, and many

  6. Department of Energy Operation Quality Assurance Program for the Waste Isolation Pilot Plant (WIPP) Project (Carlsbad, New Mexico)

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of this plan is to describe the Quality Assurance (QA)reverse arrow Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Project Participants: the Scientific Advisor (Sandia National Laboratory) and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the Pre-Operational and Operational phases of the WIPP Project not addressed under the construction phase. This plan also requires the QA Programs for DOE and Project Participants to be structured so as to comply with this plan and ANSI-ASME NQA-1. The prime responsibility for Operational Quality Assurance rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Scientific Advisor and the Management and Operating Contractor. Overviews of selected operational and testing activities will be are conducted in accordance with prescribed requirements and that adequate documentation of these activities is maintained. 4 figs

  7. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  8. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  9. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  10. A Pilot Project Demonstrating that Combat Medics Can Safely Administer Parenteral Medications in the Emergency Department.

    Science.gov (United States)

    Schauer, Steven G; Cunningham, Cord W; Fisher, Andrew D; DeLorenzo, Robert A

    2017-12-01

    Introduction Select units in the military have improved combat medic training by integrating their functions into routine clinical care activities with measurable improvements in battlefield care. This level of integration is currently limited to special operations units. It is unknown if regular Army units and combat medics can emulate these successes. The goal of this project was to determine whether US Army combat medics can be integrated into routine emergency department (ED) clinical care, specifically medication administration. Project Design This was a quality assurance project that monitored training of combat medics to administer parenteral medications and to ensure patient safety. Combat medics were provided training that included direct supervision during medication administration. Once proficiency was demonstrated, combat medics would prepare the medications under direct supervision, followed by indirect supervision during administration. As part of the quality assurance and safety processes, combat medics were required to document all medication administrations, supervising provider, and unexpected adverse events. Additional quality assurance follow-up occurred via complete chart review by the project lead. Data During the project period, the combat medics administered the following medications: ketamine (n=13), morphine (n=8), ketorolac (n=7), fentanyl (n=5), ondansetron (n=4), and other (n=6). No adverse events or patient safety events were reported by the combat medics or discovered during the quality assurance process. In this limited case series, combat medics safely administered parenteral medications under indirect provider supervision. Future research is needed to further develop this training model for both the military and civilian setting. Schauer SG , Cunningham C W, Fisher AD , DeLorenzo RA . A pilot project demonstrating that combat medics can safely administer parenteral medications in the emergency department. Prehosp Disaster Med. 2017;32(6):679-681.

  11. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  12. Waste handling and storage in the decontamination pilot projects of JAEA for environments of Fukushima

    Energy Technology Data Exchange (ETDEWEB)

    Nakayama, S.; Kawase, K.; Iijima, K.; Kato, M. [Fukushima Environmental Safety Center, Headquarters of Fukushima Partnership Operations, Japan Atomic Energy Agency, Fukushima (Japan)

    2013-07-01

    After the Fukushima Daiichi nuclear accident, Japan Atomic Energy Agency (JAEA) was chosen by the national government to conduct decontamination pilot projects at selected sites in Fukushima prefecture. Despite tight boundary conditions in terms of timescale and resources, the projects served their primary purpose to develop a knowledge base to support more effective planning and implementation of stepwise regional remediation of the evacuated zone. A range of established, modified and newly developed techniques were tested under realistic field conditions and their performance characteristics were determined. The results of the project can be summarized in terms of site characterization, cleanup and waste management. A range of options were investigated to reduce the volumes of waste produced and to ensure that decontamination water could be cleaned to the extent that it could be discharged to normal drainage. Resultant solid wastes were packaged in standard flexible containers, labelled and stored at the remediation site (temporary storage until central interim storage becomes available). The designs of such temporary storage facilities were tailored to available sites, but all designs included measures to ensure mechanical stability (e.g., filling void spaces between containers with sand, graded cover with soil) and prevent releases to groundwater (impermeable base and cap, gravity flow drainage including radiation monitors and catch tanks). Storage site monitoring was also needed to check that storage structures would not be perturbed by external events that could include typhoons, heavy snowfalls, freeze/thaw cycles and earthquakes. (authors)

  13. Pilot Test of the Online Public Access Catalog Project's User and Nonuser Questionnaires. Final Report.

    Science.gov (United States)

    Markey, Karen

    This report describes the pilot data collections and post-questionnaire interview activities of the Council on Library Resources (CLR)/Online Computer Library Center (OCLC) Online Public Access Project. The background of the project is briefly described, the purpose and adminstration of the post-questionnaire interviews are outlined, and pilot…

  14. Statistics on Science and Technology in Latin America, Experience with UNESCO Pilot Projects, 1972-1974.

    Science.gov (United States)

    Thebaud, Schiller

    This report examines four UNESCO pilot projects undertaken in 1972 in Brazil, Colombia, Peru, and Uruguay to study the methods used for national statistical surveys of science and technology. The projects specifically addressed the problems of comparing statistics gathered by different methods in different countries. Surveys carried out in Latin…

  15. Reflections on a Pilot Project: Removing the "Dis" from Disability

    Science.gov (United States)

    Yee, Michelle J.

    2012-01-01

    This paper explores preliminary results of a pilot study whose purpose was to document, through an oral history narrative, the personal and work experiences of a female artist and social entrepreneur who is legally blind. These experiences included the challenges that the research participant has experienced in the U.S. as a woman with an…

  16. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  17. The NYC native air sampling pilot project: using HVAC filter data for urban biological incident characterization.

    Science.gov (United States)

    Ackelsberg, Joel; Leykam, Frederic M; Hazi, Yair; Madsen, Larry C; West, Todd H; Faltesek, Anthony; Henderson, Gavin D; Henderson, Christopher L; Leighton, Terrance

    2011-09-01

    Native air sampling (NAS) is distinguished from dedicated air sampling (DAS) devices (eg, BioWatch) that are deployed to detect aerosol disseminations of biological threat agents. NAS uses filter samples from heating, ventilation, and air conditioning (HVAC) systems in commercial properties for environmental sampling after DAS detection of biological threat agent incidents. It represents an untapped, scientifically sound, efficient, widely distributed, and comparably inexpensive resource for postevent environmental sampling. Calculations predict that postevent NAS would be more efficient than environmental surface sampling by orders of magnitude. HVAC filter samples could be collected from pre-identified surrounding NAS facilities to corroborate the DAS alarm and delineate the path taken by the bioaerosol plume. The New York City (NYC) Native Air Sampling Pilot Project explored whether native air sampling would be acceptable to private sector stakeholders and could be implemented successfully in NYC. Building trade associations facilitated outreach to and discussions with property owners and managers, who expedited contact with building managers of candidate NAS properties that they managed or owned. Nominal NAS building requirements were determined; procedures to identify and evaluate candidate NAS facilities were developed; data collection tools and other resources were designed and used to expedite candidate NAS building selection and evaluation in Manhattan; and exemplar environmental sampling playbooks for emergency responders were completed. In this sample, modern buildings with single or few corporate tenants were the best NAS candidate facilities. The Pilot Project successfully demonstrated that in one urban setting a native air sampling strategy could be implemented with effective public-private collaboration.

  18. Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-06-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

  19. The Teen Photovoice Project: A Pilot Study to Promote Health Through Advocacy

    Science.gov (United States)

    Necheles, Jonathan W.; Chung, Emily Q.; Hawes-Dawson, Jennifer; Ryan, Gery W.; Williams, La’Shield B.; Holmes, Heidi N.; Wells, Kenneth B.; Vaiana, Mary E.; Schuster, Mark A.

    2009-01-01

    Background Clinicians, public health practitioners, and policymakers would like to understand how youth perceive health issues and how they can become advocates for health promotion in their communities. 1,2 Traditional research methods can be used to capture these perceptions, but are limited in their ability to activate (excite and engage) youth to participate in health promotion activities. Objectives To pilot the use of an adapted version of photovoice as a starting point to engage youth in identifying influences on their health behaviors in a process that encourages the development of health advocacy projects. Methods Application of qualitative and quantitative methods to a participatory research project that teaches youth the photovoice method to identify and address health promotion issues relevant to their lives. Participants included 13 students serving on a Youth Advisory Board (YAB) of the UCLA/RAND Center for Adolescent Health Promotion working in four small groups of two to five participants. Students were from the Los Angeles, California, metropolitan area. Results Results were derived from photograph sorting activities, analysis of photograph narratives, and development of advocacy projects. Youth frequently discussed a variety of topics reflected in their pictures that included unhealthy food choices, inducers of stress, friends, emotions, environment, health, and positive aspects of family. The advocacy projects used social marketing strategies, focusing on unhealthy dietary practices and inducers of stress. The youths’ focus on obesity-related issues have contributed to the center’s success in partnering with the Los Angeles Unified School District on a new community-based participatory research (CBPR) project. Conclusion Youth can engage in a process of identifying community-level health influences, leading to health promotion through advocacy. Participants focused their advocacy work on selected issues addressing the types of unhealthy food

  20. Pilot Overmyer looks over food selections and experiments with beverage

    Science.gov (United States)

    1982-01-01

    Pilot Overmyer, using beverage container and drinking straw secured in meal tray assembly (ASSY), experiments with microgravity chararcteristics of liquid on middeck in front of forward lockers. Overmyer also looks over packages of food attached to middeck lockers in meal tray assemblies. Carry-on food warmer appears overhead and other meal tray assemblies, personal hygiene mirror assy, personal hygiene kit, and portrait of G.W.S. Abbey, JSC's Director of Flight Operations, appear on lockers.

  1. Pilot training of non-nuclear professionals within CORONA project

    International Nuclear Information System (INIS)

    Ilieva, K.; Manolova, M.; Belousov, S.

    2013-01-01

    The pilot training results shown that the used approach is appropriate and could be disseminate among the interested parties. • The interest from the side of the different professionals is an important indicator about the necessity to care such courses for non-nuclear professionals.The effectiveness of the training program for non-nuclear specialists will be assessed using the replies of the Course evaluation form as well as the feedback from employers, trainers and observers

  2. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  3. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects*

    Science.gov (United States)

    Kreps, Gary L.

    2005-01-01

    Objective: This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. Method: The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. Results: The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. Implications: The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations. PMID:16239960

  4. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects.

    Science.gov (United States)

    Kreps, Gary L

    2005-10-01

    This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations.

  5. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  6. A computer graphics pilot project - Spacecraft mission support with an interactive graphics workstation

    Science.gov (United States)

    Hagedorn, John; Ehrner, Marie-Jacqueline; Reese, Jodi; Chang, Kan; Tseng, Irene

    1986-01-01

    The NASA Computer Graphics Pilot Project was undertaken to enhance the quality control, productivity and efficiency of mission support operations at the Goddard Operations Support Computing Facility. The Project evolved into a set of demonstration programs for graphics intensive simulated control room operations, particularly in connection with the complex space missions that began in the 1980s. Complex mission mean more data. Graphic displays are a means to reduce the probabilities of operator errors. Workstations were selected with 1024 x 768 pixel color displays controlled by a custom VLSI chip coupled to an MC68010 chip running UNIX within a shell that permits operations through the medium of mouse-accessed pulldown window menus. The distributed workstations run off a host NAS 8040 computer. Applications of the system for tracking spacecraft orbits and monitoring Shuttle payload handling illustrate the system capabilities, noting the built-in capabilities of shifting the point of view and rotating and zooming in on three-dimensional views of spacecraft.

  7. Developing collaborative person-centred practice: a pilot project on a palliative care unit.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Gravelle, Debbie; Thibault, Hélène

    2007-02-01

    Maximizing interprofessional collaborative patient-centred practice holds promise for improving patient care and creating satisfying work roles. In Canada's evolving health care system, there are demands for increased efficiency, cost-effectiveness, and quality improvement. Interprofessional collaboration warrants re-examination because maximizing interprofessional collaboration, especially nurse-physician collaboration, holds promise for improving patient care and creating satisfying work roles. A palliative care team seized the opportunity to pilot a different approach to patient and family care when faced with a reduction in medical staff. Grounded in a collaborative patient-centred practice approach, the Canadian Hospice Palliative Care Association's National Model to Guide Hospice Palliative Care (2002), and outcomes from program retreats and workgroups, a collaborative person-centred model of care was developed for a 12-bed pilot project. Preliminary findings show that the pilot project team perceived some specific benefits in continuity of care and interprofessional collaboration, while the presence of the physician was reduced to an average of 3.82 hours on the pilot wing, compared with 8 hours on the non-pilot wings. This pilot study suggests that a person-centred model, when focused on the physician-nurse dyad, may offer improved efficiency, job satisfaction and continuity of care on a palliative care unit. Incorporating all team members and developing strategies to successfully expand the model across the whole unit are the next challenges. Further research into the impact of these changes on the health care professionals, management and patients and families is essential.

  8. Neuroradiology computer-assisted instruction using interactive videodisk: Pilot project

    International Nuclear Information System (INIS)

    Andrews, C.L.; Goldsmith, D.G.; Osborn, A.G.; Stensaas, S.S.; Davidson, H.C.; Quigley, A.C.

    1987-01-01

    The availability of microcomputers, high-resolution monitors, high-level authoring languages, and videodisk technology make sophisticated neuroradiology instruction a cost-effective possibility. The authors developed a laser videodisk and interactive software to teach normal and pathologic gross and radiologic anatomy of the sellar/juxtasellar region. A spectrum of lesions is presented with information for differential diagnosis included. The exhibit permits conference participants to review the pilot module and experience the self-paced learning and self-evaluation possible with computer-assisted instruction. They also may choose to peruse a ''visual database'' by instant random access to the videodisk by hand control

  9. NHS Blood Tracking Pilot: City University Evaluation Project

    Science.gov (United States)

    Goddard, Kate; Shabestari, Omid; Adriano, Juan; Kay, Jonathan; Roudsari, Abdul

    Automation of healthcare processes is an emergent theme in the drive to increase patient safety. The Mayday Hospital has been chosen as the pilot site for the implementation of the Electronic Clinical Transfusion Management System to track blood from the point of ordering to the final transfusion. The Centre for Health Informatics at City University is carrying out an independent evaluation of the system implementation using a variety of methodologies to both formatively inform the implementation process and summatively provide an account of the lessons learned for future implementations.

  10. 7 CFR 1944.529 - Project selection.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... administering its programs. (3) The effectiveness of the current efforts by the applicant to assist low-income...-354 office. (10) The extent to which the project will be cost effective, including but not limited to...

  11. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  12. Evaluation of bridge decks using non-destructive evaluation (NDE) at near highway speeds for effective asset management - pilot project.

    Science.gov (United States)

    2016-09-29

    This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...

  13. Ground Characterization Studies in Canakkale Pilot Site of LIQUEFACT Project

    Science.gov (United States)

    Ozcep, F.; Oztoprak, S.; Aysal, N.; Bozbey, I.; Tezel, O.; Ozer, C.; Sargin, S.; Bekin, E.; Almasraf, M.; Cengiz Cinku, M.; Ozdemir, K.

    2017-12-01

    The our aim is to outline the ground characterisation studies in Canakkale test site. Study is based on the EU H2020 LIQUEFACT project entitled "Liquefact: Assessment and mitigation of liquefaction potential across Europe: a holistic approach to protect structures / infrastructures for improved resilience to earthquake-induced liquefaction disasters". Objectives and extent of ground characterization for Canakkale test site includes pre-existing soil investigation studies and complementary field studies. There were several SPT and geophysical tests carried out in the study area. Within the context of the complementary tests, six (6) study areas in the test site were chosen and complementary tests were carried out in these areas. In these areas, additional boreholes were opened and SPT tests were performed. It was decided that additional CPT (CPTU and SCPT) and Marchetti Dilatometer (DMT) tests should be carried out within the scope of the complementary testing. Seismic refraction, MASW and micro tremor measurements had been carried out in pre-existing studies. Shear wave velocities obtained from MASW measurements were evaluated to the most rigorous level. These tests were downhole seismic, PS-logging, seismic refraction, 2D-ReMi, MASW, micro tremor (H/V Nakamura method), 2D resistivity and resonance acoustic profiling (RAP). RAP is a new technique which will be explained briefly in the relevant section. Dynamic soil properties had not been measured in pre-existing studies, therefore these properties were investigated within the scope of the complementary tests. Selection of specific experimental tests of the complementary campaign was based on cost-benefit considerations Within the context of complementary field studies, dynamic soil properties were measured using resonant column and cyclic direct shear tests. Several sieve analyses and Atterberg Limits tests which were documented in the pre-existing studies were evaluated. In the complementary study carried out

  14. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  15. Evaluation of the pilot procurement project in Germany

    International Nuclear Information System (INIS)

    Ostertag, Katrin

    2003-01-01

    Energy+ represents a European cooperative procurement initiative which aims at increasing the market share of highly energy-efficient cold appliances. Three years after its start, the project was recently evaluated in Germany. This paper discusses the main evaluation results and their implications for the project's further development. It covers the impacts of Energy+ on technology development and the commercial importance of the targeted appliances. Due to the project's relatively recent start, however, the main focus of the evaluation lies on the procurement process and practical implementation elements. Of particular interest are the specificities of the considered market segment which, in Germany and also in other participating countries, is characterised by highly dispersed consumers and the lack of large institutional buyers as candidates for a buyer group. The project therefore developed a new approach emphasising the role of retail organisations and of marketing activities by the project coordinators. The evaluation discusses several challenges related to this approach. This includes issues concerning the interfaces between international producers, their national branch offices and retailers as well as conflicts between the marketing approaches of producers and retailers, in particular with respect to the use of brand names and trade marks. Further, in Energy+ the communication between users and producers, an essential innovative element of cooperative procurement, cannot take its usual role, since consumers are not directly involved in the process. The paper shows how the project has dealt with these challenges and provides recommendations for the future project design

  16. Target selection for the HRIBF Project

    International Nuclear Information System (INIS)

    Dellwo, J.; Alton, G.D.; Batchelder, J.C.

    1994-01-01

    Experiments are in progress at the Oak Ridge National Laboratory (ORNL) which are designed to select the most appropriate target materials for generating particular radioactive ion beams for the Holifield Radioactive Ion Beam Facility (HRIBF). The 25-MV tandem accelerator is used to implant stable complements of interesting radioactive elements into refractory targets mounted in a high-temperature FEBIAD ion source which is on-line at the UNISOR facility. These experiments permit selection of the target material most appropriate for the rapid release of the element of interest, as well as realistic estimates of the efficiency of the FEBIAD source. From diffusion release data information on the release times and diffusion coefficients can be derived. Diffusion coefficients for CI implanted into and diffused from CeS and Zr 5 Si 3 and As, Br, and Se implanted into and diffused from Zr 5 Ge 3 have been derived from the resulting intensity versus time profiles

  17. The Hel Peninsula – Smart Grid Pilot Project

    Directory of Open Access Journals (Sweden)

    Sławomir Noske

    2014-12-01

    Full Text Available The paper presents the scope and results of engineering, and the scope of Smart Grid deployment in the Hel Peninsula. The following functionalities will be described: Fault Detection, Isolation & Recovery – FDIR function, Integrated Volt/Var Control (IVVC function, advanced supervision of LV grid, including distributed energy resources. The paper contains implementation results and research findings, as well as preliminary cost-benefit analysis of the project. Moreover, since Smart Metering and Smart Grid projects are being deployed in the same region – the Hel Peninisula – the benefit achieved by merging the two projects will be explained.

  18. Quality improvement process pilot project at Gallagher station

    International Nuclear Information System (INIS)

    Vondielingen, D.E.

    1992-01-01

    A Quality Improvement Process was piloted at Gallagher station in 1990 to address issues of two Electric System Strategy Group (ESSG) goals. Darrell McElravy headed a group to address quality, productivity and prove and Judy Rushing headed a group to address innovation and recognition. These groups combined when a process was identified that could address both issues. The process was designed for PSI Energy by Business Incentives and is an incentive-based quality improvement process that seeks employee involvement to identify inhibitors t performance and to establish a method to eliminate the problem. Performance goals were also established that help focus efforts to improve performance and reward employees for their efforts

  19. SAGES's advanced GI/MIS fellowship curriculum pilot project.

    Science.gov (United States)

    Weis, Joshua J; Goldblatt, Matthew; Pryor, Aurora; Dunkin, Brian J; Brunt, L Michael; Jones, Daniel B; Scott, Daniel J

    2018-06-01

    The American health care system faces deficits in quality and quantity of surgeons. SAGES is a major stakeholder in surgical fellowship training and is responsible for defining the curriculum for the Advanced GI/MIS fellowship. SAGES leadership is actively adapting this curriculum. The process of reform began in 2014 through a series of iterative meetings and discussions. A working group within the Resident and Fellow Training Committee reviewed case log data from 2012 to 2015. These data were used to propose new criteria designed to provide adequate exposure to core content. The working group also proposed using video assessment of an MIS case to provide objective assessment of competency. Case log data were available for 326 fellows with a total of 85,154 cases logged (median 227 per fellow). The working group proposed new criteria starting with minimum case volumes for five defined categories including foregut (20), bariatrics (25), inguinal hernia (10), ventral hernia (10), and solid organ/colon/thoracic (10). Fellows are expected to perform an additional 75 complex MIS cases of any category for a total of 150 required cases overall. The proposal also included a minimum volume of flexible endoscopy (50) and submission of an MIS foregut case for video assessment. The new criteria more clearly defined which surgeon roles count for major credit within individual categories. Fourteen fellowships volunteered to pilot these new criteria for the 2017-2018 academic year. The new SAGES Advanced GI/MIS fellowship has been crafted to better define the core content that should be contained in these fellowships, while still allowing sufficient heterogeneity so that individual learners can tailor their training to specific areas of interest. The criteria also introduce innovative, evidence-based methods for assessing competency. Pending the results of the pilot program, SAGES will consider broad implementation of the new fellowship criteria.

  20. Transitioning the GED[R] Mathematics Test to Computer with and without Accommodations: A Pilot Project

    Science.gov (United States)

    Patterson, Margaret Becker; Higgins, Jennifer; Bozman, Martha; Katz, Michael

    2011-01-01

    We conducted a pilot study to see how the GED Mathematics Test could be administered on computer with embedded accessibility tools. We examined test scores and test-taker experience. Nineteen GED test centers across five states and 216 randomly assigned GED Tests candidates participated in the project. GED candidates completed two GED mathematics…

  1. Life-Long Cyberlearning System: A Pilot Project for the "Learning Society" in the ROC.

    Science.gov (United States)

    Han, Huei-Wen; Wang, Yen-Chao

    1999-01-01

    Provides an overview of the implementation of lifelong learning in Taiwan, Republic of China (ROC) as part of its educational reform policy and describes a pilot project, the Lifelong Cyberlearning System. Highlights include planning architecture, Web-based learning technology, professional education, industrial and corporate assistance, and…

  2. The Recon Pilot Project: A Progress Report, October 1970-May 1971

    Directory of Open Access Journals (Sweden)

    Henriette D. Avram

    1971-09-01

    Full Text Available Synopsis of three progress reports on the RECON Pilot Project submitted by the Library of Congress to the Council on Library Resources covering the period October 1970-May 1971. Progress is reported in the following areas: RECON production, foreign language editing test, format recognition, microfilming, input devices, and tasks assigned to the RECON Working Task Force.

  3. Pilot projects and their diffusion: a case study of integrated coastal management in South Africa

    CSIR Research Space (South Africa)

    Vreugdenhil, H

    2012-01-01

    Full Text Available contribution to the diffusion of the innovation and so to a policy transition in South African coastal zone management. Finally, we identify types of pilot project and the accompanying design choices that are most suitable for transition management....

  4. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  5. Human Development across the Lifespan. A Pilot Intergenerational Project in Three Pennsylvania School Districts. Final Evaluation.

    Science.gov (United States)

    Ward, Christopher R.; Balavage, Valerie

    An evaluation determined the impact on participants of pilot intergenerational programs in the Central Greene, Quaker Valley, and Titusville school districts in western Pennsylvania. It examined how participation in project activities changed students' attitudes about older adults and aging. A four-part questionnaire consisted of the following:…

  6. A methodology for assessment of road structures for the PBS pilot project in South Africa

    CSIR Research Space (South Africa)

    Nordengen, Paul A

    2016-11-01

    Full Text Available This paper describes the methodology that is being used for the performance assessment of PBS vehicles in terms of road structures as part of the PBS pilot project in South Africa. The assessment approach has evolved from the standard “bridge...

  7. 78 FR 71645 - Pilot Project for Tribal Jurisdiction over Crimes of Domestic Violence

    Science.gov (United States)

    2013-11-29

    ...This final notice establishes procedures for Indian tribes to request designation as participating tribes under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, under the voluntary pilot project described in the Violence Against Women Reauthorization Act; establishes procedures for the Attorney General to act on such requests; and solicits such requests from Indian tribes.

  8. Optimization of the cumulative risk assessment of pesticides and biocides using computational techniques: Pilot project

    DEFF Research Database (Denmark)

    Jonsdottir, Svava Osk; Reffstrup, Trine Klein; Petersen, Annette

    This pilot project is intended as the first step in developing a computational strategy to assist in refining methods for higher tier cumulative and aggregate risk assessment of exposure to mixture of pesticides and biocides. For this purpose, physiologically based toxicokinetic (PBTK) models were...

  9. An Audit Learning Experience: A Pilot Project through Cooperation with a Third Sector Organization

    Science.gov (United States)

    Tonge, Richard; Willett, Caroline

    2012-01-01

    This paper is a critical evaluation of a pilot cooperative education project conducted with a charitable organization in the UK. An action research approach was adopted. Final level students who are studying auditing have had the opportunity to apply the knowledge and skills they are developing through their studies to a real-life situation in the…

  10. Insights from stakeholders of five residential smart grid pilot projects in the Netherlands

    NARCIS (Netherlands)

    Obinna, U.; Joore, P.; Wauben, L.; Reinders, Angelina H.M.E.

    2016-01-01

    This paper presents insights and perceptions of stakeholders involved in the development and implementation of residential smart grid pilot projects in the Netherlands, adding to the limited information that is currently available in this area, while expectations about the potential benefits of

  11. Convergent and divergent learning in photovoltaic pilot projects and subsequent niche development

    NARCIS (Netherlands)

    Mierlo, van B.

    2012-01-01

    A proposed strategy to facilitate the use and development of radical new sustainable technologies is the creation of niches. Learning in these niches and the social embedding of learning experiences can stimulate changes in existing sociotechnological regimes. Pilot projects in which new

  12. Monitoring pilot projects on bored tunnelling : The Second Heinenoord Tunnel and the Botlek Rail Tunnel

    NARCIS (Netherlands)

    Bakker, K.J.; De Boer, F.; Admiraal, J.B.M.; Van Jaarsveld, E.P.

    1999-01-01

    Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be

  13. Pilot project for implementing corporate governance of IT

    OpenAIRE

    Fernández Martínez, Antonio; Gumbau Mezquita, José Pascual; Llorens Largo, Faraón

    2012-01-01

    This article presents the results of the IT Governance Enhancement Project (ITGEP) carried out in three Spanish universities (the University of Murcia, Jaume I University and the Polytechnic University of Cartagena) on the initiative of the IT Commission of the Spanish Association of University Rectors (CRUE). The aim of the project was to apply the reference framework of Governance of IT for Universities (GTI4U) in order to determine the best practices currently carried out in the three univ...

  14. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  15. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  16. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  17. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    Science.gov (United States)

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural

  18. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  19. Geomechanical applications for the Waste Isolation Pilot Plant (WIPP) project

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Hunter, T.O.

    1981-01-01

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility in bedded salt addressing the technical issues associated with the demonstration of disposal of radioactive waste from the defense programs of the USA. The geomechanical program includes laboratory experimentation, constitutive model and computer code development, and in-situ experimentation. Various material models, including creep for salt, and techniques for predicting room response under thermal and mechanical loads have been developed and are being applied to experiment and facility designs. A Benchmark II study has been conducted to compare the capabilities of nine structural codes to predict response of underground configuration under ambient temperature and with a thermal load of 7.5 W/m 2 . Parametric studies are being conducted to evaluate optimum room configurations. A series of in situ experiments is the next step towards validating models and predictive techniques. These experiments will be conducted in a facility in southeastern New Mexico mined at a depth of 659 m

  20. Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.

    Science.gov (United States)

    Rhodes, Ed; Carter, Ruth

    2003-01-01

    The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…

  1. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  2. A pilot project to improve access to telepsychotherapy at rural clinics.

    Science.gov (United States)

    Adler, Geri; Pritchett, Lonique R; Kauth, Michael R; Nadorff, Danielle

    2014-01-01

    The U.S. Department of Veterans Affairs (VA) has pioneered telemental health (TMH) with over 500,000 TMH encounters over the past decade. VA community-based outpatient clinics were established to improve accessibility of mental healthcare for rural Veterans. Despite these clinics clinics and increased availability of TMH, many rural Veterans have difficulty receiving mental healthcare, particularly psychotherapy. Twelve therapists participated in a pilot project using TMH technologies to improve mental healthcare service delivery to rural Veterans treated at six community clinics. Therapists completed online training, and study staff communicated with them monthly and clinical leaders every other month. Therapists completed two questionnaires: before training and 10 months later. This article describes barriers and facilitators to the implementation of the project, as well as therapists' knowledge, confidence, and motivation regarding TMH. Two clinicians were offering telepsychotherapy after 10 months. At all six sites, unanticipated organizational constraints and administrative barriers delayed implementation; establishing organizational practices and therapists' motivation helped facilitate the process. Adopters of the project reported more positive views of the modality and did not worry about staffing, a concern of nonadopters. Despite barriers to implementation, lessons learned from this pilot project have led to improvements and changes in TMH processes. Results from the pilot showed that therapists providing telepsychotherapy had increased confidence, knowledge, and motivation. As TMH continues to expand, formalized decision-making with clinical leaders regarding project goals, better matching of therapists with this modality, and assessment of medical center and clinic readiness are recommended.

  3. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Protocols and Pilot Studies

    Science.gov (United States)

    Rosenzweig, C.; Jones, J. W.; Hatfield, J. L.; Ruane, A. C.; Boote, K. J.; Thorburn, P.; Antle, J. M.; Nelson, G. C.; Porter, C.; Janssen, S.; hide

    2012-01-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a major international effort linking the climate, crop, and economic modeling communities with cutting-edge information technology to produce improved crop and economic models and the next generation of climate impact projections for the agricultural sector. The goals of AgMIP are to improve substantially the characterization of world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. Analyses of the agricultural impacts of climate variability and change require a transdisciplinary effort to consistently link state-of-the-art climate scenarios to crop and economic models. Crop model outputs are aggregated as inputs to regional and global economic models to determine regional vulnerabilities, changes in comparative advantage, price effects, and potential adaptation strategies in the agricultural sector. Climate, Crop Modeling, Economics, and Information Technology Team Protocols are presented to guide coordinated climate, crop modeling, economics, and information technology research activities around the world, along with AgMIP Cross-Cutting Themes that address uncertainty, aggregation and scaling, and the development of Representative Agricultural Pathways (RAPs) to enable testing of climate change adaptations in the context of other regional and global trends. The organization of research activities by geographic region and specific crops is described, along with project milestones. Pilot results demonstrate AgMIP's role in assessing climate impacts with explicit representation of uncertainties in climate scenarios and simulations using crop and economic models. An intercomparison of wheat model simulations near Obregón, Mexico reveals inter-model differences in yield sensitivity to [CO2] with model uncertainty holding approximately steady as concentrations rise, while uncertainty related to choice of crop model increases with

  4. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  5. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  6. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  7. [Exercise-referral to a specialist in adapted physical activity (APA) : a pilot project].

    Science.gov (United States)

    Brugnerotto, Adeline; Cardinaux, Regula; Ueltschi, Yan; Bauwens, Marine; Nanchen, David; Cornuz, Jacques; Bize, Raphaël; Auer, Reto

    2016-11-02

    Family physicians have a key role in the promotion of physical activity, in particular in identifying and counseling persons who have a sedentary lifestyle. Some patients could benefit from intensive individual counseling. Physicians are often not aware of all physical activity promotion activities in the community that they could recommend their patients. In a pilot study, we have tested and adapted the referral of patients from family physicians to specialists in adapted physical activity (APAs). APAs are trained to assess and guide persons towards physical activities adapted to their needs and pathologies and thus towards an increase in physical activity. Pilot data suggest that, while few patients were oriented to the APAs in the pilot project, family physicians appreciate the possibility of collaborating with the APAs.

  8. Testing and Commissioning of Lillgrund Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Poul Erik; Larsson, Aake; Jeppsson, Joakim; Toernkvist, Mattias (ed.) (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-04-15

    This report gives an overview of the tests carried out in the Lillgrund project. The report covers factory tests, site tests and the performance tests, which can be carried out during the defects liability period. The report describes tests relevant for the wind turbine generators, the electrical system and the foundations. On the whole, the Lillgrund test results have been satisfactory. One of the more problematic issues experienced were when the foundation interface verification showed that the bolts were not meeting the height requirements. Since this shortcoming was detected relatively early in the project life, it was possible to correct the misalignment and keep the additional costs to a minimum. From a management point of view, this highlighted the importance of clear and unambiguous interface specifications and to make sure that the project has a proper interface management function. According to the Contract, Vattenfall has the right to verify a number of performance parameters during the 5-year defect liability period. The performance tests include availability, power curve, electrical system losses and acoustic noise levels. The contract specifies the test criteria, the test methods and procedures and the penalty if the tests result in undesirable levels. In some cases, there is a financial incentive for the supplier if the tests show that the wind farm is performing better than stipulated in the contract. Lillgrund has performed very well thus far and Vattenfall has determined that the contractual performance requirements are being met. Vattenfall has, therefore, not requested to carry out any of these elective Performance Tests

  9. QR Codes in the Library: Are They Worth the Effort? Analysis of a QR Code Pilot Project

    OpenAIRE

    Wilson, Andrew M.

    2012-01-01

    The literature is filled with potential uses for Quick Response (QR) codes in the library. Setting, but few library QR code projects have publicized usage statistics. A pilot project carried out in the Eda Kuhn Loeb Music Library of the Harvard College Library sought to determine whether library patrons actually understand and use QR codes. Results and analysis of the pilot project are provided, attempting to answer the question as to whether QR codes are worth the effort for libraries.

  10. Integrating Informatics into the Undergraduate Curriculum: A Report on a Pilot Project.

    Science.gov (United States)

    Ingram, D; Murphy, J

    1996-01-01

    Previous case reports in this series on Education and Training have looked at specialist courses for postgraduate students seeking an in-depth knowledge of informatics and a career in the field. By contrast, this review describes a project designed to pilot a series of learning opportunities for undergraduate medical students. Although some UK medical colleges have opted to introduce informatics into the curriculum as a discipline in its own right, the Informatics Department at St Bartholomew's Hospital Medical College chose a different approach. When a new curriculum was introduced at St Bartholomew's and at The London Hospital Medical College, the Head of the Informatics Department saw this as an ideal opportunity to explore ways of integrating informatics into the curriculum. The initiatives described in this paper were made possible as a result of an award from the UK government Department of Employment. Money from an Enterprise in Higher Education grant funded a range of programmes, one of which was designed to introduce students to selected aspects of informatics and to demonstrate what is feasible in the undergraduate curriculum. The work carried out over a period of three and a half years was intended to provide the basis for the next phase of curriculum development. However, in the wake of the restructuring which has taken place in London medical colleges, the Informatics Department at what was St Bartholomew's has relocated to University College London Medical School, and is now called The Centre for Health Informatics and Multiprofessional Education (CHIME). University College is designing a new medical curriculum and CHIME is drawing on the experience gained through the Enterprise Project to find the best way to integrate informatics into this curriculum.

  11. Comparing interventions for selective mutism: a pilot study.

    Science.gov (United States)

    Manassis, Katharina; Tannock, Rosemary

    2008-10-01

    To examine the outcome within 6 to 8 months of medical and nonmedical intervention for children with severe selective mutism (SM). Children with SM (n = 17) and their mothers, seen in a previous study, attended follow-up appointments with a clinician. Obtained by maternal report were: treatment received, current diagnosis (based on semi-structured interview), speech in various environments, and global improvement. An independent clinician also rated global functioning. The diagnosis of SM persisted in 16 children, but significant symptomatic improvement was evident in the sample. All children had received school consultations. Children who had been treated with selective serotonin reuptake inhibitors (SSRI) (n = 10) showed greater global improvement, improvement in functioning, and improvement in speech outside the family than children who were unmedicated (n = 7). No differences were evident for children receiving and not receiving additional nonmedical intervention. The findings suggest the potential benefit of SSRI treatment in severe SM, but randomized comparative treatment studies are indicated.

  12. Pilot research projects for underground disposal of radioactive wastes in the United States of America

    International Nuclear Information System (INIS)

    Stein, R.; Collyer, P.L.

    1984-01-01

    Disposal of commercial radioactive waste in the United States of America in a deep underground formation will ensure permanent isolation from the biosphere with minimal post-closure surveillance and maintenance. The siting, design and development, performance assessment, operation, licensing, certification and decommissioning of an underground repository have stimulated the development of several pilot research projects throughout the country. These pilot tests and projects, along with their resulting data base, are viewed as important steps in the overall location and construction of a repository. Beginning in the 1960s, research at pilot facilities has progressed from underground spent fuel tests in an abandoned salt mine to the production of vitrified nuclear waste in complex borosilicate glass logs. Simulated underground repository experiments have been performed in the dense basalts of Washington State, the volcanic tuffaceous rock of Nevada and both domal and bedded salts of Louisiana and Kansas. In addition to underground pilot in situ tests, other facilities have been constructed or modified to monitor the performance of spent fuel in dry storage wells and self-shielded concrete casks. As the National Waste Terminal Storage (NWTS) programme advances to the next stage of underground site characterization for each of three different geological sites, additional pilot facilities are under consideration. These include a Test and Evaluation Facility (TEF) for site verification and equipment performance and testing, as well as a salt testing facility for verification of in situ simulation equipment. Although not associated with the NWTS programme, the construction of the Waste Isolation Pilot Plant (WIPP) in the bedded salts of New Mexico is well under way for deep testing and experimentation with the defence programme's transuranic nuclear waste. (author)

  13. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  14. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  15. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  16. Sweet Sorghum Alternative Fuel and Feed Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Slack, Donald C. [Univ. of Arizona, Tucson, AZ (United States). Agricultural and Biosystems Engineering Dept.; Kaltenbach, C. Colin [Univ. of Arizona, Tucson, AZ (United States)

    2013-07-30

    The University of Arizona undertook a “pilot” project to grow sweet sorghum on a field scale (rather than a plot scale), produce juice from the sweet sorghum, deliver the juice to a bio-refinery and process it to fuel-grade ethanol. We also evaluated the bagasse for suitability as a livestock feed and as a fuel. In addition to these objectives we evaluated methods of juice preservation, ligno-cellulosic conversion of the bagasse to fermentable sugars and alternative methods of juice extraction.

  17. Venus project : experimentation at ENEA`s pilot site

    Energy Technology Data Exchange (ETDEWEB)

    Bargellini, M L; Fontana, F [ENEA, Centro Ricerche Casaccia, Rome (Italy). Dip. Innovazione; Bucci, C; Ferrara, F; Sottile, P A [GESI s.r.l., Rome (Italy); Niccolai, L; Scavino, G [Rome Univ. Sacro Cuore (Italy); Mancini, R; Levialdi, S [Rome Univ. La Sapienza (Italy). Dip. di Scienze dell` Informazione

    1996-12-01

    The document describes the ENEA`s (Italian Agency for New Technologies, Energy and the Environment) experience in the Venus Project (Esprit III ). Venus is an advanced visual interface based on icon representation that permits to end-user to inquiry databases. VENUS interfaces to ENEA`s databases: cometa materials Module, Cometa Laboratories Module and European Programs. This report contents the results of the experimentation and of the validation carried out in ENEA`s related to the Venus generations. Moreover, the description of the architecture, the user requirements syntesis and the validation methodology of the VENUS systems have been included.

  18. The Palouse Basin Participatory Model Pilot Project: A Participatory Approach to Bi-state Groundwater Management

    Science.gov (United States)

    Beall, A.; Fiedler, F.; Boll, J.; Cosens, B.; Harris, C.

    2008-12-01

    In March 2008, The University of Idaho Waters of the West, the Palouse Basin Aquifer Committee and its Citizen Advisory Group undertook a pilot project to explore the use of participatory modeling to assist with water resource management decisions. The Palouse basin supplies Moscow, Idaho, Pullman, Washington, and surrounding communities with high quality groundwater. However, water levels in the major aquifer systems have been declining since records have been kept. Solutions are complicated by jurisdictional considerations and limited alternatives for supply. We hope that by using a participatory approach major conflicts will be avoided. Group system dynamics modeling has been used for various environmental concerns such as air quality, biological management, water quality and quantity. These models create a nexus of science, policy, and economic and social concerns, which enhances discussion of issues surrounding the use of natural resources. Models may be developed into educational and or decision support tools which can be used to assist with planning processes. The long-term goal of the Palouse basin project is to develop such a model. The pilot project participants include hydrologists, facility operators, policy makers and local citizens. The model they have developed integrates issues such as scientific uncertainty, groundwater volumes, and potential conservation measures and costs. Preliminary results indicate that participants are satisfied with the approach and are looking to use the model for education and to help direct potential research. We will present the results of the pilot project, including the developed model and insights from the process.

  19. Lessons Learned From the Environmental Public Health Tracking Sub-County Data Pilot Project.

    Science.gov (United States)

    Werner, Angela K; Strosnider, Heather; Kassinger, Craig; Shin, Mikyong

    2017-12-07

    Small area data are key to better understanding the complex relationships between environmental health, health outcomes, and risk factors at a local level. In 2014, the Centers for Disease Control and Prevention's National Environmental Public Health Tracking Program (Tracking Program) conducted the Sub-County Data Pilot Project with grantees to consider integration of sub-county data into the National Environmental Public Health Tracking Network (Tracking Network). The Tracking Program and grantees developed sub-county-level data for several data sets during this pilot project, working to standardize processes for submitting data and creating required geographies. Grantees documented challenges they encountered during the pilot project and documented decisions. This article covers the challenges revealed during the project. It includes insights into geocoding, aggregation, population estimates, and data stability and provides recommendations for moving forward. National standards for generating, analyzing, and sharing sub-county data should be established to build a system of sub-county data that allow for comparison of outcomes, geographies, and time. Increasing the availability and accessibility of small area data will not only enhance the Tracking Network's capabilities but also contribute to an improved understanding of environmental health and informed decision making at a local level.

  20. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  1. A European Seal of Approval for 'gay' businesses: findings from an HIV-prevention pilot project.

    Science.gov (United States)

    Sherriff, Nigel; Gugglberger, Lisa

    2014-05-01

    'Gay' businesses can be important settings through which to deliver health promotion interventions to vulnerable populations, such as men who have sex with men (MSM) regarding HIV prevention. This article draws on data from the European Everywhere project, which represents the first scheme to develop and pre-test a common framework for HIV/STI prevention in 'gay' businesses across eight European countries. The scientific basis of the Everywhere framework was developed using a comprehensive consensus-building process over 30 months. This process included: formative scoping research; interviews with 54 'gay' businesses; meetings/workshops with representatives from project partners, 'gay' businesses, public health administrations and external experts; 15 interviews and three focus groups with project partners; a five-month pilot action phase in eight countries, together with support from the project's Advisory Group; and all Everywhere project partners including the Scientific Steering Committee. A voluntary European code setting out differentiated HIV/STI-prevention standards for 'gay' businesses (including sex venues, 'gay' and 'gay' friendly social spaces, travel agencies, hotels, dating websites) was developed and piloted in eight European cities. During a five-month pilot action, 83 'gay' businesses were certified with the Everywhere Seal of Approval representing a considerable increase on the expected pilot target of 30. Everywhere offers a major contribution to the public health and/or health promotion field in the form of a practical, policy-relevant, settings-based HIV-prevention framework for 'gay' businesses that is common across eight European countries. Findings suggest that a European-wide model of prevention is acceptable and feasible to businesses.

  2. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  3. Pilot project Uljabuouda. Final report; Pilotprojekt Uljabuouda. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    During the period of 2007-2010 Skellefteaa Kraft AB erected a wind farm comprising 10 3 MW wind turbines on the mountain Uljabuouda in the municipality of Arjeplog. The turbines are of the type WWD-3 with a hub height of 80 meters and a rotor diameter of 90 meters. The Uljabuouda wind farm is one of the first erected above the treeline in the Swedish mountains. The wind turbines are adapted to cold climate equipped with an ice prevention system for the blades. The process of obtaining the necessary permits for the erection of the wind farm was lengthy and lasted during the period of 2000 to 2008. Also the procurement process took longer than expected. During the period of 2006-2008 when the procurement was performed it was difficult to find a supplier who could offer wind turbines equipped with a deicing system. In December 2006 the Uljabuouda project was granted a subsidy from the Swedish Energy Agency, the maximum of 35 million Swedish crowns. The final investment costs of the project will be higher than previously estimated. The main reason for this was the prevailing market conditions during the procurement period. The Uljabuouda wind farm is in full operation since the winter of 2010/2011 and so far our experiences are that the ice prevention system is working well even at harsh icing conditions

  4. Pilot project "The zoo goes to school", enriching the classroom

    Directory of Open Access Journals (Sweden)

    Michel Mendes

    2014-12-01

    Full Text Available Environmental education does not only occur in formal institutions, and yes has been widely disseminated among non formal spaces of education, which complements its ecological and social nature. Zoos are the institutions that play an important role in environmental education, raising awareness and preparing citizens to act in the critically and ethical society, committed to the environment. The objective of this study was to evaluate the environmental perception of students in 7th grade of elementary school in Municipal Elementary School Jardelino Ramos, in partnership with the Zoo, University of Caxias do Sul. Twenty-four questionnaires were applied in order to diagnose the environmental perception of students through four questions regarding activities at the zoo. After it was contextualized and discussed on the topics: zoos and their history, function, animals and their enclosures, technical education and environmental enrichment. To complement the enrichment technique discussed in class, the students sewed materials that were later added to the precincts of animals chosen for themselves. A week after the project is completed was held again the questionnaire to verify the results obtained from the project. These were analyzed, discussed and compared through graphs, which show that the objectives were achieved and the didactics used was efficient, as described in the article.

  5. Maintenance planning for transmission routes with medium voltage overlines - experience within the framework of two pilot projects; Trassenpflegeplanung fuer Mittel- und Hochspannungsfreileitungen - Erfahrungen von zwei Pilotprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Geiges, H. [Ingenieurbuero Geiges, Freiraum- und Landschaftsplanung, Laumersheim (Germany)

    1997-11-03

    On the basis of the `VDEW Orientation Aid for Maintenance Measures in Transmission Routes` two pilot projects were selected in a 110 kV and a 20 kV overhead transmission route. (orig.) [Deutsch] Auf der Grundlage der `VDEW-Orientierungshilfe zu Pflegemassnahmen in Leitungstrassen` wurden Pilotprojekte in einer 110-kV- und in einer 20-kV-Freileitungstrasse im suedlichen Pfaelzerwald ausgewaehlt. (orig.)

  6. Live Storybook Outcomes of Pilot Multidisciplinary Elementary Earth Science Collaborative Project

    Science.gov (United States)

    Soeffing, C.; Pierson, R.

    2017-12-01

    Live Storybook Outcomes of pilot multidisciplinary elementary earth science collaborative project Anchoring phenomena leading to student led investigations are key to applying the NGSS standards in the classroom. This project employs the GLOBE elementary storybook, Discoveries at Willow Creek, as an inspiration and operational framework for a collaborative pilot project engaging 4th grade students in asking questions, collecting relevant data, and using analytical tools to document and understand natural phenomena. The Institute of Global Environmental Strategies (IGES), a GLOBE Partner, the Outdoor Campus, an informal educational outdoor learning facility managed by South Dakota Game, Fish and Parks, University of Sioux Falls, and All City Elementary, Sioux Falls are collaborating partners in this project. The Discoveries at Willow Creek storyline introduces young students to the scientific process, and models how they can apply science and engineering practices (SEPs) to discover and understand the Earth system in which they live. One innovation associated with this project is the formal engagement of elementary students in a global citizen science program (for all ages), GLOBE Observer, and engaging them in data collection using GLOBE Observer's Cloud and Mosquito Habitat Mapper apps. As modeled by the fictional students from Willow Creek, the 4th grade students will identify their 3 study sites at the Outdoor Campus, keep a journal, and record observations. The students will repeat their investigations at the Outdoor Campus to document and track change over time. Students will be introduced to "big data" in a manageable way, as they see their observations populate GLOBE's map-based data visualization and . Our research design recognizes the comfort and familiarity factor of literacy activities in the elementary classroom for students and teachers alike, and postulates that connecting a science education project to an engaging storybook text will contribute to a

  7. Developing Collections With Get It Now: A Pilot Project for a Hybrid Collection.

    Science.gov (United States)

    Hendler, Gail Y; Gudenas, Jean

    2016-01-01

    As health sciences libraries transition from print to online journal collections that require significant institutional funding, librarians are investigating the use of on demand services in order to meet customer need and contain costs. In 2014 a three-year pilot project to determine if unmediated access to the Copyright Clearance Center's Get It Now service would expand access to needed content and provide usage data to inform collections decision making. The service provides rapid, automated delivery of unsubscribed, high-quality journal articles directly to the customer. The three-year pilot project aims to compare the cost of Get It Now to the traditional subscription model to learn if the service is a cost-effective and sustainable alternative that improves customer satisfaction and that can transform collection development with a hybrid model for journal acquisitions.

  8. Image applications for coastal resource planning: Elkhorn Slough Pilot Project

    Science.gov (United States)

    Kvitek, Rikk G.; Sharp, Gary D.; VanCoops, Jonathan; Fitzgerald, Michael

    1995-01-01

    The purpose of this project has been to evaluate the utility of digital spectral imagery at two levels of resolution for large scale, accurate, auto-classification of land cover along the Central California Coast. Although remote sensing technology offers obvious advantages over on-the-ground mapping, there are substantial trade-offs that must be made between resolving power and costs. Higher resolution images can theoretically be used to identify smaller habitat patches, but they usually require more scenes to cover a given area and processing these images is computationally intense requiring much more computer time and memory. Lower resolution images can cover much larger areas, are less costly to store, process, and manipulate, but due to their larger pixel size can lack the resolving power of the denser images. This lack of resolving power can be critical in regions such as the Central California Coast where important habitat change often occurs on a scale of 10 meters. Our approach has been to compare vegetation and habitat classification results from two aircraft-based spectral scenes covering the same study area but at different levels of resolution with a previously produced ground-truthed land cover base map of the area. Both of the spectral images used for this project were of significantly higher resolution than the satellite-based LandSat scenes used in the C-CAP program. The lower reaches of the Elkhorn Slough watershed was chosen as an ideal study site because it encompasses a suite of important vegetation types and habitat loss processes characteristic of the central coast region. Dramatic habitat alterations have and are occurring within the Elkhorn Slough drainage area, including erosion and sedimentation, land use conversion, wetland loss, and incremental loss due to development and encroachnnent by agriculture. Additonally, much attention has already been focused on the Elkhorn Slough due to its status as a National Marine Education and Research

  9. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  10. Communication training as a part of medical education: a pilot project

    Directory of Open Access Journals (Sweden)

    Petersen, Corinna

    2005-01-01

    Full Text Available Within the last years, the importance of communication skills regarding the doctor-patient-relationship received more attention. Medical school curricula for future physicians must include teaching of communication skills as well. A pilot project for training communicative basic skills at the University Hospital Hamburg-Eppendorf will be presented. The content of teaching was generated by employees of the Institute and Policlinics of Medical Psychology. Contents of the course will be described and experiences discussed.

  11. PROBABILISTIC INTEREST RATE SETTING WITH A SHADOW BOARD: A DESCRIPTION OF THE PILOT PROJECT

    OpenAIRE

    TIMO HENCKEL; SHAUN VAHEY; LIZ WAKERLY

    2011-01-01

    This study aims to assess the scope for monetary policymakers to aggregate probabilistic interest rate advice. The members of a Shadow Board give probabilistic assessments of the appropriate (target) interest rate for Australia in real time. The pilot project will be running each month from August to December (inclusive) 2011, with the Shadow Board giving advice shortly before each decision by the Reserve Bank of Australia (RBA) Board.

  12. An Evaluation of the British Red Cross’ Educational Pilot Project for Young People Serving Reparation Orders

    OpenAIRE

    Dresser, Paul; Irving, Adele; Soppitt, Sarah

    2015-01-01

    Using Newcastle Youth Offending Team (YOT) as a case-study, this report presents the findings of the evaluation of the British Red Cross (BRC) Educational Pilot Project (EPP) for service users serving reparation as part of Community Orders. The EPP was implemented between November 2011 and June 2012. However prior to this development, the BRC and Newcastle YOT had been working in partnership since 2005, to offer young people alternative forms of youth justice, focused around more physical tas...

  13. National Land Imaging Requirements (NLIR) Pilot Project summary report: summary of moderate resolution imaging user requirements

    Science.gov (United States)

    Vadnais, Carolyn; Stensaas, Gregory

    2014-01-01

    Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only

  14. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  15. Propulsion Selection for 85kft Remotely Piloted Atmospheric Science Aircraft

    Science.gov (United States)

    Bents, David J.; Mockler, Ted; Maldonado, Jaime; Hahn, Andrew; Cyrus, John; Schmitz, Paul; Harp, Jim; King, Joseph

    1996-01-01

    This paper describes how a 3 stage turbocharged gasoline engine was selected to power NASA's atmospheric science unmanned aircraft now under development. The airplane, whose purpose is to fly sampling instruments through targeted regions of the upper atmosphere at the exact location and time (season, time of day) where the most interesting chemistry is taking place, must have a round trip range exceeding 1000 km, carry a payload of about 500 lb to altitudes exceeding 80 kft over the site, and be able to remain above that altitude for at least 30 minutes before returning to base. This is a subsonic aircraft (the aerodynamic heating and shock associated with supersonic flight could easily destroy the chemical species that are being sampled) and it must be constructed so it will operate out of small airfields at primitive remote sites worldwide, under varying climate and weather conditions. Finally it must be low cost, since less than $50 M is available for its development. These requirements put severe constraints on the aircraft design (for example, wing loading in the vicinity of 10 psf) and have in turn limited the propulsion choices to already-existing hardware, or limited adaptations of existing hardware. The only candidate that could emerge under these circumstances was a propeller driven aircraft powered by spark ignited (SI) gasoline engines, whose intake pressurization is accomplished by multiple stages of turbo-charging and intercooling. Fortunately the turbocharged SI powerplant, owing to its rich automotive heritage and earlier intensive aero powerplant development during WWII, enjoys in addition to its potentially low development costs some subtle physical advantages (arising from its near-stochiometric combustion) that may make it smaller and lighter than either a turbine engine or a diesel for these altitudes. Just as fortunately, the NASA/industry team developing this aircraft includes the same people who built multi-stage turbocharged SI powerplants

  16. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  17. DSM energy saving pilot project report. Furniture Plant Teika, Riga, Latvia

    International Nuclear Information System (INIS)

    Ananevski, V.; Kalejs, M.; Hercogs, J.; Blumbergs, U.

    1995-07-01

    The purpose of this pilot project was to carry out energy audit into the furniture plant TEIKA and energy saving measures. Another aim was to transfer the Danish know how and experience obtained through the Danish effort in Latvian industries consumers. Therefore great attention is paid to energy mapping in order to show possibilities of the Danish methodisms. This report is a part of the Joint Latvian - Danish Project Demand Side Management and Energy Saving. It is a results of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and on the other hand a Danish team, which was represented by the Danish Power Consult company NESA. (EG)

  18. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  19. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  20. Consumers’ behaviour and motives for selection of dairy beverages in Kvarner region: a pilot study

    OpenAIRE

    Krešić, Greta; Herceg, Zoran; Lelas, Vesna; Režek Jambrak, Anet

    2010-01-01

    Since food choice is always a unique and personal experience, consumer behaviour is important for food manufacturers and marketers in term of product success. Due to the beneficial healthprotective effects of dairy beverages, this market segment is very innovative and fast-growing. The aim of this pilot-study was to examine the consumption patterns, purchasing behaviour and motives for selection of dairy beverages. The sample of this study included 114 participants (44 males and 70 females...

  1. Consumers’ behaviour and motives for selection of dairy beverages in Kvarner region: a pilot study

    OpenAIRE

    Greta Krešić; Zoran Herceg; Vesna Lelas; Anet Režek Jambrak

    2010-01-01

    Since food choice is always a unique and personal experience, consumer behaviour is important for food manufacturers and marketers in term of product success. Due to the beneficial healthprotective effects of dairy beverages, this market segment is very innovative and fast-growing. The aim of this pilot-study was to examine the consumption patterns, purchasing behaviour and motivesfor selection of dairy beverages. The sample of this study included 114 participants (44 males and 70 females) wh...

  2. "No queremos vender oxígeno" : the implementation of a REDD pilot project in the Bolivian Amazon

    OpenAIRE

    Bardalen, Ingunn

    2011-01-01

    Based on a six month fieldwork in an indigenous community in an indigenous territory, TCO, this thesis explore the initial stages of the implementation of a REDD pilot project in the northern Bolivian amazon. Since the establishment of the indigenous territory, there has been increasing pressure from logging companies and illegal logging, which has caused forest degradation in these areas. The REDD pilot project seek to reduce forest degradation in this area, and through monitoring this reduc...

  3. The Biomarker Knowledge System Informatics Pilot Project Supplement To The Biomarker Development Laboratory at Moffitt (Bedlam) — EDRN Public Portal

    Science.gov (United States)

    The Biomarker Knowledge System Informatics Pilot Project goal will develop network interfaces among databases that contain information about existing clinical populations and biospecimens and data relating to those specimens that are important in biomarker assay validation. This protocol comprises one of two that will comprise the Moffitt participation in the Biomarker Knowledge System Informatics Pilot Project. THIS PROTOCOL (58) is the Sput-Epi Database.

  4. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  5. Mapping the above and belowground biomass in three landscapes in Cameroon, Rwanda and DRC: pilot cases in REDD+ pilot project.

    Science.gov (United States)

    Sufo Kankeu, R.

    2017-12-01

    A number of biomass/carbon maps have been recently produced using different approaches and despite their comparison there is still a gap. To fill this gap there is a need to provide accurate maps based on the field data on all types of land use and land cover. Based on the field data from plots established in three pilot projects around Virunga National park in Rwanda, Tri-national Sangha landscape in Cameroon and lac Télé-Lac Tumba landscape in DRC, this paper intend to analyse the relationship between land use change and biomass and present the variability through biomass/carbon maps. The above and belowground biomass was calculated from 95 nested plots of 20 meters radius. The value of biomass/carbon per plot were thus used to elaborate carbon maps of each study site. In the same the way the correlation between the land use and underground and above ground carbon stock were analysed using geographically weighted regression. These data have been joint with classified Spot 5 image and aggregated to come out will acceptable result. Results show that there is a strong relationship between land use in various project sites and the carbon stock related, the change of a forest cover directly impact on carbon stock/biomass.in the same way carbon map realized base on field data and IDW, Kriging or spline module show an idea on the carbon distribution but the maps are not accurate giving the distance between plots,

  6. Holistic assessment of a landfill mining pilot project in Austria: Methodology and application.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Wolfsberger, Tanja; Ragossnig, Arne; Pomberger, Roland

    2016-07-01

    Basic technical and economic examinations of Austrian mass waste landfills, concerning the recovery of secondary raw materials, have been carried out by the 'LAMIS - Landfill Mining Austria' pilot project for the first time in Austria. A main focus of the research - the subject of this article - was the first devotion of a pilot landfill to an integrated ecological and economic assessment so that its feasibility could be verified before a landfill mining project commenced. A Styrian mass waste landfill had been chosen for this purpose that had been put into operation in 1979 and received mechanically-biologically pre-treated municipal waste till 2012. The whole assessment procedure was divided into preliminary and main assessment phases to evaluate the general suitability of a landfill mining project with little financial and human resource expense. A portfolio chart, based on a questionnaire, was created for the preliminary assessment that, as a result, has provided a recommendation for subsequent investigation - the main assessment phase. In this case, specific economic criteria were assessed by net present value calculation, while ecological or socio-economic criteria were rated by utility analysis, transferring the result into a utility-net present value chart. In the case of the examined pilot landfill, assessing the landfill mining project produced a higher utility but a lower net present value than a landfill leaving-in for aftercare. Since no clearly preferable scenario could be identified this way, a cost-revenue analysis was carried out in addition that determined a dimensionless ratio: the 'utility - net present value quotient' of both scenarios. Comparing this quotient showed unmistakably that in the overall assessment, 'leaving the landfill in aftercare' was preferable to a 'landfill mining project' in that specific case. © The Author(s) 2016.

  7. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  8. WIPP: Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of the Waste Isolation Pilot Plant are discussed briefly: history and site selection; salt as a disposal medium; transporting waste materials; early key events; impacts on New Mexico; project organization; and site certification profile

  9. Russian energy efficiency projects: lessons learnt from Activities Implemented Jointly pilot phase

    International Nuclear Information System (INIS)

    Korppoo, Anna

    2005-01-01

    Russia needs to improve the efficiency of energy. Failure to do so will retard the economic recovery of the country, but the energy sector is lacking both domestic and foreign investments. JI projects could provide the underfinanced Russian energy sector with additional investments. AIJ pilot project experiences provide an overview of the potential difficulties for future JI projects. Institutional problems were the most important category. Most of these problems remain, and the lack of ratification of the Kyoto Protocol by Russia has formed a new very significant barrier. Implementation level problems caused some problems to AIJ projects, but they are likely to have less impact on the better prepared JI projects. The character of funding-related problems has changed: for AIJ projects the main problem was that emission reductions could not be credited, whereas future JI projects will experience more competition in the Kyoto market where the overall investment climate and the availability of local cofunding are more relevant. Therefore, the unfinished economic and energy sector reforms currently discourage JI investments. The project experiences so far have been dismal, and if Russian policy-makers cannot improve this performance, only few JI projects can be expected in the future

  10. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  11. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  12. Uncertainty-handling assessment using nondeterministic learning tasks in pilot selection

    OpenAIRE

    Matton , Nadine; Raufaste , Éric; Vautier , Stéphane

    2008-01-01

    International audience; This paper addresses selection for entry into the French commercial pilot ab initio training, namely the ENAC (École Nationale de l'Aviation Civile). Applicants are mainly (more than 80%) coming from scientific preparatory classes for competitive admission to the "Grandes Écoles". Therefore these applicants are hand-picked based on their school grades in mathematics and physics. To give a hint, in 2005, only 15% of the French GCE A-Level students were selected for entr...

  13. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  14. The seed of change in society. Diffusion of solar cell systems in housing by means of pilot projects

    International Nuclear Information System (INIS)

    Van Mierlo, B.C.

    2002-01-01

    The central question in this thesis is: in what way can pilot projects contribute to the diffusion of new sustainable technologies, in particular solar cell systems in housing units. The reason for this is, in the first place, that trials, demonstration projects, practical experiments and market introduction projects are often launched by firms and subsidised by the state. The objective of such projects, referred to here as pilot projects, is in general to prepare the market introduction of new technologies. However, these projects are often realised and financed without much information being available on how they operate: about how they could prepare the market launch and how this function could be optimised. The second reason is that since the end of the 1980s the expectations in the Netherlands in respect of solar cell systems (PV systems) connected to the electricity grid have been high. These systems could have great advantages for the environment and after 2010 could be the most important source of sustainable energy. The government sees housing as the most promising market segment for these systems. It is recognised that certain major bottlenecks have to be solved before a large-scale diffusion is possible. According to the niche approach, the basic starting point of this thesis, this means that the existing social-technological regime needs to change: the rules and infrastructure according to which the existing technologies are, as it were, considered self-evident, and which hinder the introduction of new technologies. Subsidised pilot projects form a protected market niche that can stimulate a change in the regime by learning and by the social embedding of the learning experiences. According to this approach, a protected market niche is a necessary component of state-supported innovation policy if market niches do not arise spontaneously. It is, however, a limited instrument since the ultimate impact on existing regimes depends mainly on external factors

  15. The Artificial Gravity Bed Rest Pilot Project: Effects on Knee Extensor and Plantar Flexor Muscle Groups

    Science.gov (United States)

    Caiozzo, V. J.; Haddad, F.; Lee, S.; Baker, M.; Baldwin, K. M.

    2007-01-01

    The goal of this project was to examine the effects of artificial gravity (2.5 g) on skeletal muscle strength and key anabolic/catabolic markers known to regulate muscle mass. Two groups of subjects were selected for study: 1) a 21 day-bed rest (BR) control (C) group (N=7); and 2) an AG group (N=8), which was exposed to 21 days of bed-rest plus daily 1 hr exposures to AG (2.5 g). This particular experiment was part of an integrated AG Pilot Project sponsored by NASA/Johnson Space Center. The in vivo torque-velocity relationships of the knee extensors and plantar flexors of the ankle were determined pre and post treatment. Also, pre- and post treatment biopsy samples were obtained from both the vastus lateralis and soleus muscles and were used, in part, for a series of analyses on gene expression (mRNA abundance) of key factors implicated in the anabolic versus catabolic state of the muscle. Post/Pre toque-velocity determinations revealed greater decrements in knee extensor performance in the C versus AG group (P less than 0.04). The plantar flexor muscle group of the AG subjects actually demonstrated a net gain in torque-velocity relationship; whereas, in the C group the overall post/pre responses declined (AG vs C; P less than 0.001). Measurements of muscle fiber cross-sectional area (for both muscles) demonstrated a loss of approx. 20% in the C group while no losses were evident in the AG group. RT-PCR analyses of muscle biopsy specimens demonstrated that markers of growth and cytoskeletal integrity (IGF-1, IGF-1 BP4, mechano growth factor, total RNA, and pro-collagen 3a) were higher in the AG group, whereas catabolic markers (myostatin and atrogen) were elevated in the C group. Importantly, these patterns were seen in both muscles. Based on these observations we conclude that paradigms of AG have the potential to maintain the functional, biochemical, and structural homeostasis of skeletal muscle in the face of chronic unloading states. These findings also

  16. Introduction of a prehospital critical incident monitoring system--pilot project results.

    Science.gov (United States)

    Stella, Julian; Davis, Anna; Jennings, Paul; Bartley, Bruce

    2008-01-01

    Hospital medical incident monitoring improves preventable morbidity and mortality rates. Error management systems have been adopted widely in this setting. Data relating to incident monitoring in the prehospital setting is limited. Implementation of an incident monitoring process in a prehospital setting. This is a prospective, descriptive study of the pilot phase of the implementation of an incident monitoring process in a regional prehospital setting, with a focus on trauma care. Paramedics and emergency department staff submitted anonymous incident reports, and a chart review was performed on patients who met major trauma criteria. Selected trauma cases were analyzed by a structured interview/debriefing process to elucidate undocumented incidents. A project committee coded and logged all incidents and developed recommendations. Of 4,429 ambulance responses, 41 cases were analyzed. Twenty-four (58.5%; 95% CI = 49.7-67.4%) were reported anonymously, and the rest were major trauma patients. A total of 77 incidents were identified (mean per case = 1.8; CI = 1.03-2.57). Anonymous cases revealed 26 incidents (mean = 1.1; CI = 0.98-1.22); eight trauma debriefings revealed 38 incidents (mean = 4.8; CI = 0.91-8.69) and nine trauma chart reviews revealed 13 incidents (mean = 1.6; CI = 1.04-2.16). A total of 56 of 77 (72.7%; CI = 65.5-80.0%) incidents related to system inadequacies, and 15 (57.7%; CI = 46.7-68.6%) anonymously reported incidents related to resource problems. A total of 35 of 77 (45.5%; CI = 40.4-50.5%) incidents had minimal or no impact on the patients' outcomes. Thirty-four of 77 (44.2%; CI = 39.3-49.1%) incidents were considered mitigated by circumstance. Incident monitoring led to generalized feedback in most cases (65 of 77; 84.4%; CI = 77.6-91.3%); in three cases (3.9%; CI = 3.7-4.1%), specific education occurred; two cases were reported to an external body (2.6%; CI = 2.5-2.7%); three cases resulted in remedial action (3.9%; CI = 3.7-4.1%); four for

  17. Kinship--king's social harmonisation project. Pilot phase of a social network for use in higher education (HE).

    Science.gov (United States)

    John, B A

    2013-05-08

    Students entering Higher Education are increasingly information and communications technology literate. Many students (graduates and undergraduates) arrive as "digital residents", who are adept with social media and technologically fluent. The informal use of social media for learning is becoming increasingly evident, along with the potentially detrimental effects of a poor digital profile on employment prospects. This paper describes the creation of Kinship (King's Social Harmonisation Project), a university hosted, members only social network, which is currently being piloted in the Medical School at King's College London. Along with a number of other teaching and learning resources, it is intended to use Kinship to establish an informal code of conduct by modelling and moderating appropriate professional online behaviour. Kinship was developed using an open source Elgg platform, thanks to funding of £20,000 from the College Teaching Fund under the mentorship of Brighton University (1). This educational research project, led by Medicine, was proposed to select, customise and evaluate a social networking platform in order to provide functionality that would enhance new and existing e-learning resources, support group interaction, participation and sharing and meet the diverse needs of three academic schools: Medicine, the Dental Institute and two separate Departments, the Modern Languages Centre and the Department of English from Arts & Humanities, as a pilot for wider College deployment. Student involvement is central to the project, from conducting the evaluation to moulding and customising the functionality and look of Kinship, in order to ensure that the site is authentic and evolves in response to their wishes and requirements. Formal evaluation of Kinship commences summer 2012.

  18. Projets Pilotes Quebecois Portant sur L'Integration Scolaire aux Niveaux Pre-Scolaire et Primaire (Quebec Pilot Projects on Mainstreaming of Preschool and Primary-Level Schoolchildren).

    Science.gov (United States)

    Saint-Laurent, Lise; And Others

    1992-01-01

    This article synthesizes 55 Quebec (Canada) pilot projects on mainstreaming of pupils with learning disabilities, behavior disorders, physical or sensorial handicaps, or mental handicaps, at preschool and elementary levels. It focuses on extent of integration, interventions, training and support for teachers, and evaluation methodology used.…

  19. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  20. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  1. Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

    Science.gov (United States)

    This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I.

  2. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  3. Navigating Bioethical Waters: Two Pilot Projects in Problem-Based Learning for Future Bioscience and Biotechnology Professionals.

    Science.gov (United States)

    Berry, Roberta M; Levine, Aaron D; Kirkman, Robert; Blake, Laura Palucki; Drake, Matthew

    2016-12-01

    We believe that the professional responsibility of bioscience and biotechnology professionals includes a social responsibility to contribute to the resolution of ethically fraught policy problems generated by their work. It follows that educators have a professional responsibility to prepare future professionals to discharge this responsibility. This essay discusses two pilot projects in ethics pedagogy focused on particularly challenging policy problems, which we call "fractious problems". The projects aimed to advance future professionals' acquisition of "fractious problem navigational" skills, a set of skills designed to enable broad and deep understanding of fractious problems and the design of good policy resolutions for them. A secondary objective was to enhance future professionals' motivation to apply these skills to help their communities resolve these problems. The projects employed "problem based learning" courses to advance these learning objectives. A new assessment instrument, "Skills for Science/Engineering Ethics Test" (SkillSET), was designed and administered to measure the success of the courses in doing so. This essay first discusses the rationale for the pilot projects, and then describes the design of the pilot courses and presents the results of our assessment using SkillSET in the first pilot project and the revised SkillSET 2.0 in the second pilot project. The essay concludes with discussion of observations and results.

  4. Global Change Data Base Pilot (Diskette) Project for Africa. Dase base documentation version 1.1

    Science.gov (United States)

    1992-06-01

    The data base for Africa contains vegetation data, climate data, and other thematic data for a recent three and a half year period. The documentation contains separate chapters of material edited about separate data sets of the overall Global Change Data Base, Pilot (diskette) Project for Africa. Descriptions of data formats, authors, and contributors are accompanied by documentation of the development/use of the data. These materials have been suggested and contributed directly by the authors of the individual data sets. To avoid confusion, some information contained in the documentation that is not directly relevant to the data base has been either omitted, crossed out, or blanked out.

  5. Pilot project concerning the establishment of a collective biomass conversion plant on the island of Mors

    International Nuclear Information System (INIS)

    1993-06-01

    This pilot project comprises a feasibility study in connection with plans to establish a biomass conversion plant, on the Danish island of Mors, which would provide methane to be used as fuel, in combination with natural gas, for a cogeneration plant serving six villages. The subjects of location, organization, the transportation of biomass, the design of the biomass conversion plant, economical aspects and conditions of the use of the methane are discussed as a basis for decisions in this respect. Environmental considerations are also dealt with. (AB)

  6. Using an Optionally Piloted Aircraft for Airborne Gravity Observations with the NOAA GRAV-D Project

    Science.gov (United States)

    Youngman, M.; Johnson, J. A.; van Westrum, D.; Damiani, T.

    2017-12-01

    The U.S. National Geodetic Survey's (NGS) Gravity for the Redefintion of the American Vertical Datum (GRAV-D) project is collecting airborne gravity data to support a 1 cm geoid. Started in 2008, this project will collect airborne gravity data over the entire U.S. and territories by 2022. As of June 30, 2017, the project was almost 62% complete. With recent technological developments, NGS has been exploring using unmanned aircraft for airborne gravity measurements. This presentation will focus on results from two surveys over the U.S. Appalachian and Rocky Mountains using the Aurora Centaur Optionally Piloted Aircraft and the Micro-g Lacoste Turnkey Airborne Gravimeter System 7 (TAGS7). Collecting high quality data as well as dealing with remote locations has been a challenge for the GRAV-D project and the field of airborne gravity in general. Unmanned aircraft could potentially improve data quality, handle hard to reach locations, and reduce pilot fatigue. The optionally piloted Centaur aircraft is an attractive option because it is not restricted in U.S. airspace and delivers high quality gravity data. Specifically, the Centaur meets U.S. Federal Aviation Administration regulations for Unmanned Aircraft Systems (UAS) by using a safety pilot on board to maintain line of sight and the ability to take control in the event of an emergency. Even though this is a sizeable UAS, most traditional gravimeters are too large and heavy for the platform. With a smaller and lighter design, the TAGS7 was used for its ability to conform to the aircraft's size restrictions, with the added benefit of upgraded performance capabilities. Two surveys were performed with this aircraft and gravimeter, one in April and one in August to September of 2017. Initial results indicate that the high-gain, fast response of the Centaur autopilot (optimized for flights without passengers), coupled with the full-force feedback sensor of the TAGS7, provides superior performance in all conditions, and

  7. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  8. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  9. Personnel Selection Influences on Remotely Piloted Aircraft Human-System Integration.

    Science.gov (United States)

    Carretta, Thomas R; King, Raymond E

    2015-08-01

    Human-system integration (HSI) is a complex process used to design and develop systems that integrate human capabilities and limitations in an effective and affordable manner. Effective HSI incorporates several domains, including manpower, personnel and training, human factors, environment, safety, occupational health, habitability, survivability, logistics, intelligence, mobility, and command and control. To achieve effective HSI, the relationships among these domains must be considered. Although this integrated approach is well documented, there are many instances where it is not followed. Human factors engineers typically focus on system design with little attention to the skills, abilities, and other characteristics needed by human operators. When problems with fielded systems occur, additional training of personnel is developed and conducted. Personnel selection is seldom considered during the HSI process. Complex systems such as aviation require careful selection of the individuals who will interact with the system. Personnel selection is a two-stage process involving select-in and select-out procedures. Select-in procedures determine which candidates have the aptitude to profit from training and represent the best investment. Select-out procedures focus on medical qualification and determine who should not enter training for medical reasons. The current paper discusses the role of personnel selection in the HSI process in the context of remotely piloted aircraft systems.

  10. The Dance Within: A Pilot Project in Dance for the Handicapped and Teaching Dance for the Handicapped: A Curriculum Guide.

    Science.gov (United States)

    Michigan Dance Association, Lansing.

    The Michigan Dance Association's Dance Project for the Handicapped is the subject of the two pamphlets that make up this document. The first pamphlet, "The Dance Within," describes the history, nature and goals of the Jackson Pilot Project, the first handicapped dance program in Michigan; it also offers suggestions on how to set up similar…

  11. An analysis of the impact of the thermonuclear pilot project ITER on industry and research in Austria

    International Nuclear Information System (INIS)

    Hangel, G.

    2007-03-01

    An analysis of the influence of the thermonuclear pilot project ITER on Austrian research and industrial activities is presented in terms of the following subjects: fusion research history, ITER technique, security, nuclear fusion, ITER (reactor, project specifications for quotations), possibilities for Austrian companies and fusion research in Austria. (nevyjel)

  12. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  13. Smooth Transition for Advancement to Graduate Education (STAGE) for Underrepresented Groups in the Mathematical Sciences Pilot Project: Broadening Participation through Mentoring

    Science.gov (United States)

    Eubanks-Turner, Christina; Beaulieu, Patricia; Pal, Nabendu

    2018-01-01

    The Smooth Transition for Advancement to Graduate Education (STAGE) project was a three-year pilot project designed to mentor undergraduate students primarily from under-represented groups in the mathematical sciences. The STAGE pilot project focused on mentoring students as they transitioned from undergraduate education to either graduate school…

  14. A pilot study on acoustic regulations for schools – Comparison between selected countries in Europe

    DEFF Research Database (Denmark)

    Rasmussen, Birgit; Guigou-Carter, Catherine

    2016-01-01

    of descriptors and limit values for acoustic requirements. The paper includes examples of acoustic regulations for schools, including specific sound insulation requirements on airborne and impact sound insulation, limit values for noise from traffic and from service equipment and in addition on reverberation......Acoustic regulations for schools exist in most countries in Europe, the main reasons being improving learning conditions for pupils and work conditions for teachers. As a pilot study, comparison between requirements in selected countries in Europe has been carried out. The findings show a diversity...... time for class rooms. Furthermore, the discrepancies between countries are being discussed and some priorities for adjusting acoustic regulations in some countries indicated....

  15. EV car sharing/rental pilot project in Kyoto : an outline of the project

    Energy Technology Data Exchange (ETDEWEB)

    Kitamura, R. [Kyoto Univ., (Japan). Dept. of Civil Engineering Systems; Masunaga, K. [Japan Electric Vehicle Association, Minato, Tokyo (Japan)

    2000-07-01

    This paper presented a demonstration project in the City of Kyoto, Japan, which is aimed at determining if a Public Car System is an economically viable option for the twenty first century. The Kyoto electric vehicle (EV) car sharing project comprises advanced systems for EV reservation, check-out and return, and fleet operation and management. The most unique feature of this project is that it utilizes the ever expanding Internet and advanced mobile phones with Internet capabilities. Initially, 35 two-seater EVs will be shared by employees and visitors for business-related trips on weekdays and by tourists on weekends. The car sharing will be only short-term for only a single trip. The EV can be checked out and returned to any service depot located at railroad stations, major business centers and tourist attractions for user convenience. The ultimate goal of the project is to promote energy and resource conservation while providing adequate levels of mobility for people. Converting existing fleets to EVs which produce no exhaust gases is considered to be a viable solution to the problem of air pollution caused by traffic jams. tabs., figs.

  16. ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Field, K.; Punjabi, S.

    2014-08-01

    In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

  17. Teaching weather and climate science in primary schools - a pilot project from the UK Met Office

    Science.gov (United States)

    Orrell, Richard; Liggins, Felicity; Challenger, Lesley; Lethem, Dom; Campbell, Katy

    2017-04-01

    Wow Schools is a pilot project from the Met Office with an aim to inspire and educate the next generation of scientists and, uniquely, use the data collected by schools to improve weather forecasts and warnings across the UK. Wow Schools was launched in late 2015 with a competition open to primary schools across the UK. 74 schools entered the draw, all hoping to be picked as one of the ten lucky schools taking part in the pilot scheme. Each winning school received a fully automatic weather station (AWS), enabling them to transmit real-time local weather observations to the Met Office's Weather Observation Website (WOW - wow.metoffice.gov.uk), an award winning web portal for uploading and sharing a range of environmental observations. They were also given a package of materials designed to get students out of the classroom to observe the weather, get hands-on with the science underpinning weather forecasting, and analyse the data they are collecting. The curriculum-relevant materials were designed with the age group 7 to 11 in mind, but could be extended to support other age groups. Each school was offered a visit by a Wow Schools Ambassador (a Met Office employee) to bring the students' learning to life, and access to a dedicated forecast for its location generated by our new supercomputer. These forecasts are improved by the school's onsite AWS reinforcing the link between observations and forecast production. The Wow Schools pilot ran throughout 2016. Here, we present the initial findings of the project, examining the potential benefits and challenges of working with schools across the UK to: enrich students' understanding of the science of weather forecasting; to source an ongoing supply of weather observations and discover how these might be used in the forecasting process; and explore what materials and business model(s) would be most useful and affordable if a wider roll-out of the initiative was undertaken.

  18. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  19. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  20. Delivering a MOOC for literature searching in health libraries: evaluation of a pilot project.

    Science.gov (United States)

    Young, Gil; McLaren, Lisa; Maden, Michelle

    2017-12-01

    In an era when library budgets are being reduced, Massive Online Open Courses (MOOC's) can offer practical and viable alternatives to the delivery of costly face-to-face training courses. In this study, guest writers Gil Young from Health Care Libraries Unit - North, Lisa McLaren from Brighton and Sussex Medical School and Liverpool University PhD student Michelle Maden describe the outcomes of a funded project they led to develop a MOOC to deliver literature search training for health librarians. Funded by Health Education England, the MOOC was developed by the Library and Information Health Network North West as a pilot project that ran for six weeks. In particular, the MOOC target audience is discussed, how content was developed for the MOOC, promotion and participation, cost-effectiveness, evaluation, the impact of the MOOC and recommendations for future development. H. S. © 2017 Health Libraries Group.

  1. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  2. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.; Brandenberger, Jill M.; Pino, Christian; Martinez, Dominique M.; Rana, Komal; Wellman, Dawn M.

    2014-11-20

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on

  3. Industrial heat pumps for high temperatures - a pilot project; Industrielle varmepumper for hoeje temperaturer - et forprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M. [Dansk Energi Analyse A/S, Frederiksberg (Denmark); Weel, M.; Mikkelsen, J. [Weel and Sandvig, Kgs. Lyngby (Denmark)

    2012-03-15

    This project investigates the possibility of using mass produced and inexpensive turbo compressor technology for heat pumping in the industry. The compressors are designed for the compression of air and used by the automotive industry in connection with turbo-chargers. The heat pumps are primarily intended to use water as the working medium, which in addition to having no environmental loads, is suitable for the heat pumping at temperatures above about 60 deg. C and up to about 200 deg. C, a temperature level which is considerably higher than what has previously been observed covered with heat pumping. In this project, a Danish-produced high-speed gear (Rotrex) is used, which has just been developed to said compressor technology. In cooperation with Rotrex, the modifications relevant to a standard unit were analyzed and assessed. The project identified some areas of industry where heat pumping using this technology is considered to be attractive. A pilot plant operating with steam in a total of 12 hours is demonstrated. In more than 3 hours, the pilot plant was coupled so that it delivered useful heat supply to the evaporator. The plant has during the tests worked satisfactorily, and there is no evidence of problems with leaks in the compressor shaft sealings, neither in relation to the leakage of oil or steam, which was one of the central issues to clarify with the demonstration. In the limited testing period no problems were detected that could not be immediately resolved, i.e. the transmission in the form of a belt drive with high speed from the engine to the friction gear. In the determination of the performance of the compressor during the trial operation with steam as a working medium, it is shown that the conversion efficiency are within the expected range when taking into account the uncertainties in the measurements and the calculation method. In the experiment, no measurement of steam flow through the compressor was made, because of a greatly reduced

  4. A competency based selection procedure for Dutch postgraduate GP training: a pilot study on validity and reliability

    NARCIS (Netherlands)

    Vermeulen, M.I.; Tromp, F.; Zuithoff, N.P.; Pieters, R.H.; Damoiseaux, R.A.; Kuyvenhoven, M.M.

    2014-01-01

    Abstract Background: Historically, semi-structured interviews (SSI) have been the core of the Dutch selection for postgraduate general practice (GP) training. This paper describes a pilot study on a newly designed competency-based selection procedure that assesses whether candidates have the

  5. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  6. The Pilot Lunar Geologic Mapping Project: Summary Results and Recommendations from the Copernicus Quadrangle

    Science.gov (United States)

    Skinner, J. A., Jr.; Gaddis, L. R.; Hagerty, J. J.

    2010-01-01

    The first systematic lunar geologic maps were completed at 1:1M scale for the lunar near side during the 1960s using telescopic and Lunar Orbiter (LO) photographs [1-3]. The program under which these maps were completed established precedents for map base, scale, projection, and boundaries in order to avoid widely discrepant products. A variety of geologic maps were subsequently produced for various purposes, including 1:5M scale global maps [4-9] and large scale maps of high scientific interest (including the Apollo landing sites) [10]. Since that time, lunar science has benefitted from an abundance of surface information, including high resolution images and diverse compositional data sets, which have yielded a host of topical planetary investigations. The existing suite of lunar geologic maps and topical studies provide exceptional context in which to unravel the geologic history of the Moon. However, there has been no systematic approach to lunar geologic mapping since the flight of post-Apollo scientific orbiters. Geologic maps provide a spatial and temporal framework wherein observations can be reliably benchmarked and compared. As such, a lack of a systematic mapping program means that modern (post- Apollo) data sets, their scientific ramifications, and the lunar scientists who investigate these data, are all marginalized in regard to geologic mapping. Marginalization weakens the overall understanding of the geologic evolution of the Moon and unnecessarily partitions lunar research. To bridge these deficiencies, we began a pilot geologic mapping project in 2005 as a means to assess the interest, relevance, and technical methods required for a renewed lunar geologic mapping program [11]. Herein, we provide a summary of the pilot geologic mapping project, which focused on the geologic materials and stratigraphic relationships within the Copernicus quadrangle (0-30degN, 0-45degW).

  7. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  8. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  9. TOLD LIKE IT IS! AN EVALUATION OF AN INTEGRATED ORAL DEVELOPMENT PILOT PROJECT

    Directory of Open Access Journals (Sweden)

    David Barr

    2005-09-01

    Full Text Available Much established pedagogical and CALL (computer-assisted language learning research advocates an integrated constructivist approach to the use of technology in language learning. This paper reports on a pilot project delivered to first year undergraduate French students. The project aim was to deliver a blend of collaborative and individual learning through a combination of CALL programs and online activities alongside traditional face-to-face conversation classes. Using quantitative analysis of a pre- and posttest and a variety of questionnaires, this project assessed student progress in developing oral skills across two groups, one (the treatment group using technology and the other (the comparison group being a traditional conversation class. Each group covered the same content and underwent the same assessment procedures. In addition, through qualitative analysis measures, the project evaluated the role played by additional variables in the learning process, as well as student and staff reactions to the two approaches. The study concludes by showing that while progress was made by both groups, the progress made by those not using technology was significantly greater than that made by students using technology over a short-term study. It also highlights the need for developing pedagogy to ensure that CALL-based teaching goes beyond rehearsal activity to achieve message-orientated communication.

  10. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive

  11. Advanced Instrumentation, Information and Control (II and C) Research and Development Facility Buildout and Project Execution of LWRS II and C Pilot Projects 1 and 3

    International Nuclear Information System (INIS)

    Farris, Ronald; Oxstrand, Johanna; Weatherby, Gregory

    2011-01-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II and C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II and C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results

  12. Experimental Design of a Polymeric Solution to Improve the Mobility Ratio in a Reservoir previous implementation of a pilot project of EOR

    Directory of Open Access Journals (Sweden)

    Vanessa Cuenca

    2016-12-01

    Full Text Available This paper describes experimental formulations of polymeric solutions through lab evaluations with the objective of finding optimum solution concentration to fluid mobility in reservoirs as previous step before implementing a pilot project of enhanced oil recovery. The polymers, firstly, were selected based on the properties from fluids from reservoir. Two types of polymers were used TCC-330 and EOR909 and the experimental tests were: thermal stability, compatibility, adsorption, salinity, and displacement. The design with the best results was with polymer TCC-330 at 1,500 ppm concentration.

  13. The HADES demonstration and pilot project on radioactive waste disposal in a clay formation

    International Nuclear Information System (INIS)

    Bonne, A.; Beckers, H.; Beaufays, R.; Buyens, M.; Coursier, J.; Bruyn, D. de; Fonteyne, A.; Genicot, J.; Lamy, D.; Meynendonckx, P.; Monsecour, M.; Neerdael, B.; Noynaert, L.; Voet, M.; Volekaert, G.

    1992-01-01

    The overall objective of the HADES programme is the evaluation of the technical feasibility and safety of the disposal of radwaste in a deep clay formation. The pilot phase is aimed at demonstrating the system behaviour for those components of the system and those operations and issues which can be demonstrated directly. The time period considered covers a first phase of the development programme of the pilot project which includes: -The construction of a concrete lined tests drift of about 30 m length with a useful inner diameter of 3.5 m. In the lining, a number of openings or ports are foreseen for emplacing the various tests and sensors for the general auscultation in the host rock; - Mine-by test for the investigation of the response of the surrounding clay on the excavating; - CERBERUS test, a combined heating-irradiation test aiming at evaluating by simulation (electrical heaters and Co-60 radiation source) the impact of a HLW canister on its immediate near field; - Design of a gallery heating test for the demonstration by simulation of the behaviour of a concrete lined gallery structure and of the surrounding clay mass in a temperature field (TEMPPRES code for temperature and pressure evolution simulation). 21 refs

  14. Technology Cooperation Agreement Pilot Project: Development-Friendly Greenhouse Gas Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.

    1998-10-30

    This paper provides an overview of TCAPP, including the methodology, the results to date, and proposed future activities. It includes a detailed description of the technology cooperation frameworks completed by each country, the process that produced them and the plans for how TCAPP will help to implement the directions articulated by the country teams. The US Government initiated the Technology Cooperation Agreement Pilot Project (TCAPP) in August 1997 in recognition of the need to establish a mechanism for implementing Article 4.5 of the Framework Convention on Climate Change. ''The developed country partners shall take all practicable steps to promote, facilitate and finance, as appropriate, the transfer of, or access to, environmentally sound technologies and know-how to other Parties, particularly developing country Parties, to enable them to implement the provisions of the Convention.'' TCAPP builds support for implementing clean energy technologies by facilitating collaboration among the participating countries, the US and other OECD countries, international donors, and the private sector. The governments of Brazil, China, Kazakhstan, Mexico and the Philippines are currently participating and helping to shape this initiative. International donors and the private sector have also been actively engaged in the design and implementation of this pilot program.

  15. Preventing diarrhoea with household ceramic water filters: assessment of a pilot project in Bolivia.

    Science.gov (United States)

    Clasen, Thomas F; Brown, Joseph; Collin, Simon M

    2006-06-01

    In an attempt to prevent diarrhoea in a rural community in central Bolivia, an international non-governmental organization implemented a pilot project to improve drinking water quality using gravity-fed, household-based, ceramic water filters. We assessed the performance of the filters by conducting a five-month randomized controlled trial among all 60 households in the pilot community. Water filters eliminated thermotolerant (faecal) coliforms from almost all intervention households and significantly reduced turbidity, thereby improving water aesthetics. Most importantly, the filters were associated with a 45.3% reduction in prevalence of diarrhoea among the study population (p = 0.02). After adjustment for household clustering and repeated episodes in individuals and controlling for age and baseline diarrhoea, prevalence of diarrhoea among the intervention group was 51% lower than controls, though the protective effect was only borderline significant (OR 0.49, 95% CI: 0.24, 1.01; p = 0.05). A follow-up survey conducted approximately 9 months after deployment of the filters found 67% being used regularly, 13% being used intermittently, and 21% not in use. Water samples from all regularly used filters were free of thermotolerant coliforms.

  16. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  17. Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP). Supplementary task programme

    International Nuclear Information System (INIS)

    1992-06-01

    In the course of Phase II of the Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP), it was found that a number of topical aspects required more detail investigations, specific tests etc. than could be cared for within Phase II, under the constraint of available time and funds. Consequently, supplementary tasks have been defined and contracted. This report is the Final Report on the results achieved during the performance of these tasks. The tasks cover a wide field for example LH 2 Airbus studies some can be associated with more than one aspect. The table following hereunder may give an overview over the tasks covered. For all 23 papers a separate subject analysis has been carried out. (orig.)

  18. PV/T slates - Pilot project in Steinhausen; PV/T-Schiefer. Pilotprojekt Steinhausen

    Energy Technology Data Exchange (ETDEWEB)

    Kropf, S.

    2003-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) is one a series of five reports dealing with increasing the overall efficiency of photovoltaic (PV) installations by also using the heat collected by the dark-coloured PV panels. The work reported on addresses open questions on the use of the heat and its optimal use. This report deals with a ventilated PV-tile system (PV/T-Slates) mounted on a garden shed in Steinhausen, Switzerland. The installation provides power and heat to the main house. The report describes the construction and operation of this pilot project and the results of measurements made on its electrical and thermal performance. The results of measurements made are presented in detail in graphical form and compared with the results of simulation. Suggestions are made for the optimisation of the system. Figures are presented on energy production and energy flows in graphical form.

  19. Physical and cognitive stimulation in Alzheimer Disease. the GAIA Project: a pilot study.

    Science.gov (United States)

    Maci, Tiziana; Pira, Francesco Le; Quattrocchi, Graziella; Nuovo, Santo Di; Perciavalle, Vincenzo; Zappia, Mario

    2012-03-01

    Several data suggest that physical activity and cognitive stimulation have a positive effect on the quality of life (QoL) of people with Alzheimer's disease (AD), slowing the decline due to the disease. A pilot project was undertaken to assess the effect of cognitive stimulation, physical activity, and socialization on patients with AD and their informal caregiver's QoL and mood. Fourteen patients with AD were randomly divided into active treatment group and control group. At the end of treatment, a significant improvement in apathy, anxiety, depression, and QoL in the active treatment group was found. Considering caregivers, those of the active treatment group exhibited a significant improvement in their mood and in their perception of patients' QoL. This study provides evidence that a combined approach based on cognitive stimulation, physical activity, and socialization is a feasible tool to improve mood and QoL in patients with AD and their caregivers.

  20. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  1. Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.

    Science.gov (United States)

    Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron

    2007-05-16

    To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.

  2. Thermal sludge treatment. Pilot project on the possibilities and marginal conditions; Thermische slibontsluiting. Pilot-onderzoek naar de mogelijkheden en randvoorwaarden

    Energy Technology Data Exchange (ETDEWEB)

    Berkhof, D.; Koornneef, E.; Janus, H. [Royal Haskoning DHV, Amersfoort (Netherlands)

    2012-09-15

    As part of the agreements within the framework of the Dutch Green Deal between Water Boards and the Ministry of Economic Affairs, Agriculture and Innovation (ELI) a research program has been set up which addresses the implementation of new developments that can improve energy efficiency in the treatment of waste water. Attention is paid to supercritical gasification, supercritical oxidation and conventional gasification. The study on conventional gasification is split into two phases: research into the economic feasibility in combination with TDH (thermal pressure hydrolysis) and drying, and next to that a pilot plant. This report concerns phase 2: pilot projects on thermal sewage treatment [Dutch] Als onderdeel van de afspraken in het kader van de Green Deal tussen Waterschappen en het ministerie van ELI is een onderzoeksprogramma opgesteld gericht op het implementeren van nieuwe ontwikkelingen die de energie efficientie bij de verwerking van afvalwater kunnen verbeteren. Daarbij wordt gekeken naar superkritische vergassing en oxidatie en naar conventionele vergassing. De studie naar conventionele vergassing is gesplitst in 2 fasen: onderzoek naar de economische haalbaarheid in combinatie met TDH (thermische druk hydrolyse), en drogen en daarnaast een onderzoek op pilot plant/praktijkschaal. In de onderhavige rapportage wordt fase 2, het onderzoek op pilot plant/praktijkschaal naar thermische slibontsluiting (TSO) beschreven.

  3. Evaluation of two pilot scale membrane bioreactors for the elimination of selected surfactants from municipal wastewaters

    Science.gov (United States)

    González, Susana; Petrovic, Mira; Barceló, Damiá

    2008-07-01

    SummaryThe removal of selected surfactants, linear alkylbenzene sulfonates (LAS), coconut diethanol amides (CDEA) and alkylphenol ethoxylates and their degradation products were investigated using a two membrane bioreactor (MBR) with hollow fiber and plate and frame membranes. The two pilot plants MBR run in parallel to a full-scale conventional activated sludge (CAS) treatment. A total of eight influent samples with the corresponding effluent samples were analysed by solid phase extraction-liquid chromatography-tandem mass spectrometry (SPE-LC-MS-MS). The results indicate that both MBR have a better effluent quality in terms of chemical and biological oxygen demand (COD and BOD), NH4+ , concentration and total suspended solids (TSS). MBR showed a better similar performance in the overall elimination of the total nonylphenolic compounds, achieving a 75% of elimination or a 65% (the same elimination reached by CAS). LAS and CDEA showed similar elimination in the three systems investigated and no significant differences were observed.

  4. Community-Based Vocational Rehabilitation (CBVR) for People with Disabilities: Experiences from a Pilot Project in Nigeria

    Science.gov (United States)

    Alade, Eunice B.

    2004-01-01

    This article discusses the community-based vocational rehabilitation (CBVR) of persons with disabilities. In 1991, a pilot project was instituted by the International Labour Organisation and the United Nations Development Programme in conjunction with Oyo State Government in Nigeria. The aim was to facilitate the reintegration of persons with…

  5. Articulated vehicles of 25 meter and 60 ton in The Netherlands: the start of a pilot project

    NARCIS (Netherlands)

    Hoogvelt, R.B.J.; Huijbers, J.J.W.

    1998-01-01

    At this moment the total allowable length of an articulated vehicle in The Netherlands is 18.35 meter and its total weight is 50 ton. Several Dutch transportation organisations requested a pilot project with longer and heavier vehicles for heavy goods transpotation. Because of the environmental

  6. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    NARCIS (Netherlands)

    Duim, van der V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that

  7. Characteristics of Difficult-to-Place Youth in State Custody: A Profile of the Exceptional Care Pilot Project Population

    Science.gov (United States)

    Armour, Marilyn P.; Schwab, James

    2007-01-01

    This study examines the characteristics of Texas youth designated as "most difficult to place" recipients of service under the "Exceptional Care Pilot Project" (N = 46). Findings include, among others, high levels of comorbid psychiatric disturbance (greater than 3 diagnostic groupings), physical (78.3%) and sexual (88%)…

  8. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Photographs and drawings were edited into a book in relation with a joint project for environment preservation technologies in high-efficiency extraction and treatment of mineral resources, and detail design for a pilot plant. The book classified the related devices into fabricated devices, purchased devices and electrical devices, and contains detailed drawings and photographs thereof. (NEDO)

  9. Identification and analysis of functional elements in 1% of the human genome by the ENCODE pilot project

    DEFF Research Database (Denmark)

    Birney, Ewan; Stamatoyannopoulos, John A; Dutta, Anindya

    2007-01-01

    We report the generation and analysis of functional data from multiple, diverse experiments performed on a targeted 1% of the human genome as part of the pilot phase of the ENCODE Project. These data have been further integrated and augmented by a number of evolutionary and computational analyses...

  10. SMS picture messaging as an adjunct in emergency medicine training – pilot project on feasibility in an African healthcare system

    Directory of Open Access Journals (Sweden)

    R. Lynch*

    2013-12-01

    Conclusion: This pilot project proved very popular with participants and trainers. Technical issues proved frustrating at times and together with cost are likely to pose difficulties for its widespread use in EM training in Africa. It is worthwhile exploring this further.

  11. Feasibility and pilot study of the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project.

    Science.gov (United States)

    Sun, Lena S; Li, Guohua; DiMaggio, Charles J; Byrne, Mary W; Ing, Caleb; Miller, Tonya L K; Bellinger, David C; Han, Sena; McGowan, Francis X

    2012-10-01

    Animal studies have documented that exposure of the developing brain to commonly used anesthetic agents induces neurotoxicity and late abnormal neurobehavioral functions as adults. Results from clinical studies have all been analyzed using existing data sets, and these studies produced inconsistent results. To provide more definitive evidence to address the clinical relevance of anesthetic neurotoxicity in children, an interdisciplinary team of investigators designed and developed the Pediatric Anesthesia NeuroDevelopment Assessment (PANDA) project. We present pilot study results in 28 sibling pairs recruited and tested at the Columbia University Medical Center (CUMC) and Children's Hospital of Boston (CHB) for the PANDA project. The PANDA project uses an ambidirectional cohort design. We performed prospective neuropsychological assessment in 28 exposed-unexposed sibling pairs from 6 to 11 years of age. The exposed siblings were ASA 1 or 2 and had received a single episode of anesthesia for inguinal hernia repair before the age of 36 months and the unexposed siblings had no anesthesia before the age of 36 months. All the sibling pairs were English speaking and were 36 weeks of gestational age or older. Each sibling pair underwent a direct testing using the Wechsler Abbreviated Scale of Intelligence (WASI) and the NEuroPSYchological Assessment, second edition (NEPSY II), and the parents completed questionnaires related to behavior using CBCL and Conners rating. Data are presented as means±SD. We conducted descriptive analyses of the demographic data. We compared both the exposed and the unexposed sibling groups on WASI and NEPSY II, and total and T scores from CBCL and Conners rating were analyzed as continuous data using the paired t test between the two groups. A PPANDA study protocol was implemented to perform a pilot feasibility study. Our success rate was 96.7% in obtaining detailed medical and anesthesia records in our historical cohort. The scores for verbal

  12. Pilot Implementations

    DEFF Research Database (Denmark)

    Manikas, Maria Ie

    by conducting a literature review. The concept of pilot implementation, although commonly used in practice, is rather disregarded in research. In the literature, pilot implementations are mainly treated as secondary to the learning outcomes and are presented as merely a means to acquire knowledge about a given...... objective. The prevalent understanding is that pilot implementations are an ISD technique that extends prototyping from the lab and into test during real use. Another perception is that pilot implementations are a project multiple of co-existing enactments of the pilot implementation. From this perspective......This PhD dissertation engages in the study of pilot (system) implementation. In the field of information systems, pilot implementations are commissioned as a way to learn from real use of a pilot system with real data, by real users during an information systems development (ISD) project and before...

  13. Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Demuth, Scott Francis [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sprinkle, James K. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-26

    As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout of Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.

  14. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  15. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  16. Characteristics of Criteria for Selecting Investment Projects under Uncertainty

    Directory of Open Access Journals (Sweden)

    Adrian ENCIU

    2011-07-01

    Full Text Available Within financial theory and practice, there are used five main criteria for selecting investment projects: the net present value (NPV criterion, the internal rate of return (IRR criterion, the return term (RT criterion, the profitability ratio (PR criterion and the supplementary return (SR criterion. The assay will emphasize several new properties of said indexes for investment assessment, having as starting point the hypotheses of (approximately normal repartition of cash-flows generated by an investment project. The obtained results point to the fact that the NPV indexes (the analysis of this criterion was carried out in the article “The NPV Criterion for Valuing Investments under Uncertainty”, Daniel Armeanu, Leonard Lache, Economic Computation and Economic Cybernetics Studies and Research no. 4/2009, pp. 133-143, IRR, PR, RT and SR register normal repartitions, therefore simplifying the investment analysis under economic uncertainty, by the capacity of building confidence intervals and assessing probabilities for the inferior limits of said investment assessment indexes.

  17. Workplace-based assessment of communication skills: A pilot project addressing feasibility, acceptance and reliability

    Science.gov (United States)

    Weyers, Simone; Jemi, Iman; Karger, André; Raski, Bianca; Rotthoff, Thomas; Pentzek, Michael; Mortsiefer, Achim

    2016-01-01

    Background: Imparting communication skills has been given great importance in medical curricula. In addition to standardized assessments, students should communicate with real patients in actual clinical situations during workplace-based assessments and receive structured feedback on their performance. The aim of this project was to pilot a formative testing method for workplace-based assessment. Our investigation centered in particular on whether or not physicians view the method as feasible and how high acceptance is among students. In addition, we assessed the reliability of the method. Method: As part of the project, 16 students held two consultations each with chronically ill patients at the medical practice where they were completing GP training. These consultations were video-recorded. The trained mentoring physician rated the student’s performance and provided feedback immediately following the consultations using the Berlin Global Rating scale (BGR). Two impartial, trained raters also evaluated the videos using BGR. For qualitative and quantitative analysis, information on how physicians and students viewed feasibility and their levels of acceptance was collected in written form in a partially standardized manner. To test for reliability, the test-retest reliability was calculated for both of the overall evaluations given by each rater. The inter-rater reliability was determined for the three evaluations of each individual consultation. Results: The formative assessment method was rated positively by both physicians and students. It is relatively easy to integrate into daily routines. Its significant value lies in the personal, structured and recurring feedback. The two overall scores for each patient consultation given by the two impartial raters correlate moderately. The degree of uniformity among the three raters in respect to the individual consultations is low. Discussion: Within the scope of this pilot project, only a small sample of physicians and

  18. Workplace-based assessment of communication skills: A pilot project addressing feasibility, acceptance and reliability

    Directory of Open Access Journals (Sweden)

    Weyers, Simone

    2016-11-01

    Full Text Available Background: Imparting communication skills has been given great importance in medical curricula. In addition to standardized assessments, students should communicate with real patients in actual clinical situations during workplace-based assessments and receive structured feedback on their performance. The aim of this project was to pilot a formative testing method for workplace-based assessment. Our investigation centered in particular on whether or not physicians view the method as feasible and how high acceptance is among students. In addition, we assessed the reliability of the method.Method: As part of the project, 16 students held two consultations each with chronically ill patients at the medical practice where they were completing GP training. These consultations were video-recorded. The trained mentoring physician rated the student’s performance and provided feedback immediately following the consultations using the Berlin Global Rating scale (BGR. Two impartial, trained raters also evaluated the videos using BGR. For qualitative and quantitative analysis, information on how physicians and students viewed feasibility and their levels of acceptance was collected in written form in a partially standardized manner. To test for reliability, the test-retest reliability was calculated for both of the overall evaluations given by each rater. The inter-rater reliability was determined for the three evaluations of each individual consultation.Results: The formative assessment method was rated positively by both physicians and students. It is relatively easy to integrate into daily routines. Its significant value lies in the personal, structured and recurring feedback. The two overall scores for each patient consultation given by the two impartial raters correlate moderately. The degree of uniformity among the three raters in respect to the individual consultations is low.Discussion: Within the scope of this pilot project, only a small sample

  19. Workplace-based assessment of communication skills: A pilot project addressing feasibility, acceptance and reliability.

    Science.gov (United States)

    Weyers, Simone; Jemi, Iman; Karger, André; Raski, Bianca; Rotthoff, Thomas; Pentzek, Michael; Mortsiefer, Achim

    2016-01-01

    Background: Imparting communication skills has been given great importance in medical curricula. In addition to standardized assessments, students should communicate with real patients in actual clinical situations during workplace-based assessments and receive structured feedback on their performance. The aim of this project was to pilot a formative testing method for workplace-based assessment. Our investigation centered in particular on whether or not physicians view the method as feasible and how high acceptance is among students. In addition, we assessed the reliability of the method. Method: As part of the project, 16 students held two consultations each with chronically ill patients at the medical practice where they were completing GP training. These consultations were video-recorded. The trained mentoring physician rated the student's performance and provided feedback immediately following the consultations using the Berlin Global Rating scale (BGR). Two impartial, trained raters also evaluated the videos using BGR. For qualitative and quantitative analysis, information on how physicians and students viewed feasibility and their levels of acceptance was collected in written form in a partially standardized manner. To test for reliability, the test-retest reliability was calculated for both of the overall evaluations given by each rater. The inter-rater reliability was determined for the three evaluations of each individual consultation. Results: The formative assessment method was rated positively by both physicians and students. It is relatively easy to integrate into daily routines. Its significant value lies in the personal, structured and recurring feedback. The two overall scores for each patient consultation given by the two impartial raters correlate moderately. The degree of uniformity among the three raters in respect to the individual consultations is low. Discussion: Within the scope of this pilot project, only a small sample of physicians and

  20. FY2017 Pilot Project Plan for the Nuclear Energy Knowledge and Validation Center Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Ren, Weiju [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-10-30

    To prepare for technical development of computational code validation under the Nuclear Energy Knowledge and Validation Center (NEKVAC) initiative, several meetings were held by a group of experts of the Idaho National Laboratory (INL) and the Oak Ridge National Laboratory (ORNL) to develop requirements of, and formulate a structure for, a transient fuel database through leveraging existing resources. It was concluded in discussions of these meetings that a pilot project is needed to address the most fundamental issues that can generate immediate stimulus to near-future validation developments as well as long-lasting benefits to NEKVAC operation. The present project is proposed based on the consensus of these discussions. Analysis of common scenarios in code validation indicates that the incapability of acquiring satisfactory validation data is often a showstopper that must first be tackled before any confident validation developments can be carried out. Validation data are usually found scattered in different places most likely with interrelationships among the data not well documented, incomplete with information for some parameters missing, nonexistent, or unrealistic to experimentally generate. Furthermore, with very different technical backgrounds, the modeler, the experimentalist, and the knowledgebase developer that must be involved in validation data development often cannot communicate effectively without a data package template that is representative of the data structure for the information domain of interest to the desired code validation. This pilot project is proposed to use the legendary TREAT Experiments Database to provide core elements for creating an ideal validation data package. Data gaps and missing data interrelationships will be identified from these core elements. All the identified missing elements will then be filled in with experimental data if available from other existing sources or with dummy data if nonexistent. The resulting hybrid

  1. Computer aided process planning at the Oak Ridge Y-12 plant: a pilot project

    International Nuclear Information System (INIS)

    Hewgley, R.E. Jr.; Prewett, H.P. Jr.

    1979-01-01

    In 1976, a formal needs analysis was conducted in one of the Fabrication Division Shops of all activities from the receipt of an order through final machining. The results indicated deficiencies in process planning activities involving special production work. A pilot program was organized to investigate the benefits of emerging CAM technology and application of GT concepts for machining operations at the Y-12 Plant. The objective of the CAPP Project was to provide computer-assisted process planning for special production machining in th shop. The CAPP team was charged with the specific goal of demonstrating computer-aided process planning within a four-year term. The CAPP charter included a plan with intermediate measurable milestones for achieving its mission. In three years, the CAPP project demonstrated benefits to process planning. A capability to retrieve historical records for similar parts, to review accurately the status of all staff assignments, and to generate detailed machining procedures definitely can impact the way in which a machine shop prepared for new orders. The real payoff is in the hardcopy output (N/C programs, studies, sequence plans, and procedures). 4 figures,

  2. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  3. L’Aquila Smart Clean Air City: The Italian Pilot Project for Healthy Urban Air

    Directory of Open Access Journals (Sweden)

    Alessandro Avveduto

    2017-11-01

    Full Text Available Exposure to atmospheric pollution is a major concern for urban populations. Currently, no effective strategy has been adopted to tackle the problem. The paper presents the Smart Clean Air City project, a pilot experiment concerning the improvement in urban air quality. Small wet scrubber systems will be operating in a network configuration in suitable urban areas of L’Aquila city (Italy. The purpose of this work is to describe the project and show the preliminary results obtained in the characterization of two urban sites before the remediation test; the main operating principles of the wet scrubber system will be discussed, as well as the design of the mobile treatment plant for the processing of wastewater resulting from scrubber operation. Measurements of particle size distributions in the range of 0.30–25 µm took place in the two sites of interest, an urban background and a traffic area in the city of L’Aquila. The mean number concentration detected was 2.4 × 107 and 4.5 × 107 particles/m3, respectively. Finally, theoretical assessments, performed by Computational Fluid Dynamics (CFD codes, will show the effects of the wet scrubber operation on air pollutants under different environmental conditions and in several urban usage patterns.

  4. RandAgiamo™, a Pilot Project Increasing Adoptability of Shelter Dogs in the Umbria Region (Italy).

    Science.gov (United States)

    Menchetti, Laura; Mancini, Stefania; Catalani, Maria Chiara; Boccini, Beatrice; Diverio, Silvana

    2015-08-14

    Current Italian legislation does not permit euthanasia of dogs, unless they are ill or dangerous. Despite good intentions and ethical benefits, this 'no-kill policy' has caused a progressive overpopulation of dogs in shelters, due to abandonment rates being higher than adoption rates. Shelter overcrowding has negative implications for dog welfare and increases public costs. The aim of this paper is to describe the pilot project "RandAgiamo" implemented in a rescue shelter in the Umbria Region and to evaluate its effectiveness on the rate of dog adoption using official data. RandAgiamo aimed to increase adult shelter dogs' adoptability by a standard training and socialization programme. It also promoted dogs' visibility by publicizing them through social media and participation in events. We analysed the official data of the Umbria regional health authorities regarding dog shelters of the Perugia province of the year 2014. In the RandAgiamo shelter, the dog adoption rate was 27.5% higher than that of dogs housed in other shelters located in the same geographical area (P < 0.001). The RandAgiamo project could be beneficial for the dogs' welfare, owner satisfaction, shelter management, and public perception of shelter dogs. However, staff were required to provide dog training and related activities.

  5. High-level-waste records management system: the NRC pilot project

    International Nuclear Information System (INIS)

    Bender, A.; Altomare, P.

    1987-01-01

    The US Nuclear Regulatory Commission (NRC) and the US Dept. of Energy (DOE) have agreed to develop a licensing support system (LSS) to address the records management requirements created by the Nuclear Waste Policy Act (NWPA). The NRC is planning to conduct a negotiated rule making the modify 10CFR2, including rules governing discovery, so that parties to the licensing process will use a single information management system as a source for all licensing-related documents. The successful demonstration of the pilot project has resulted in an operational on-line record management system for NRC-related HLW documents. Both incoming and outgoing documents are being scanned and stored on a mainframe system and on an optical disk. At this writing the optical disk portion of the system is being tested to evaluate its potential use as a future archival and distribution medium for licensing records. Experience gained from this project is being shared with other government agencies that are in the process of using similar technologies to come to grips with the complex records management problem endemic to our information-based society

  6. RandAgiamo™, a Pilot Project Increasing Adoptability of Shelter Dogs in the Umbria Region (Italy

    Directory of Open Access Journals (Sweden)

    Laura Menchetti

    2015-08-01

    Full Text Available Current Italian legislation does not permit euthanasia of dogs, unless they are ill or dangerous. Despite good intentions and ethical benefits, this ‘no-kill policy’ has caused a progressive overpopulation of dogs in shelters, due to abandonment rates being higher than adoption rates. Shelter overcrowding has negative implications for dog welfare and increases public costs. The aim of this paper is to describe the pilot project “RandAgiamo” implemented in a rescue shelter in the Umbria Region and to evaluate its effectiveness on the rate of dog adoption using official data. RandAgiamo aimed to increase adult shelter dogs’ adoptability by a standard training and socialization programme. It also promoted dogs’ visibility by publicizing them through social media and participation in events. We analysed the official data of the Umbria regional health authorities regarding dog shelters of the Perugia province of the year 2014. In the RandAgiamo shelter, the dog adoption rate was 27.5% higher than that of dogs housed in other shelters located in the same geographical area (P < 0.001. The RandAgiamo project could be beneficial for the dogs’ welfare, owner satisfaction, shelter management, and public perception of shelter dogs. However, staff were required to provide dog training and related activities.

  7. Evaluation of a Pilot Project to Introduce Simulation-Based Team Training to Pediatric Surgery Trauma Room Care

    Directory of Open Access Journals (Sweden)

    Markus Lehner

    2017-01-01

    Full Text Available Introduction. Several studies in pediatric trauma care have demonstrated substantial deficits in both prehospital and emergency department management. Methods. In February 2015 the PAEDSIM collaborative conducted a one and a half day interdisciplinary, simulation based team-training course in a simulated pediatric emergency department. 14 physicians from the medical fields of pediatric surgery, pediatric intensive care and emergency medicine, and anesthesia participated, as well as four pediatric nurses. After a theoretical introduction and familiarization with the simulator, course attendees alternately participated in six simulation scenarios and debriefings. Each scenario incorporated elements of pediatric trauma management as well as Crew Resource Management (CRM educational objectives. Participants completed anonymous pre- and postcourse questionnaires and rated the course itself as well as their own medical qualification and knowledge of CRM. Results. Participants found the course very realistic and selected scenarios highly relevant to their daily work. They reported a feeling of improved medical and nontechnical skills as well as no uncomfortable feeling during scenarios or debriefings. Conclusion. To our knowledge this pilot-project represents the first successful implementation of a simulation-based team-training course focused on pediatric trauma care in German-speaking countries with good acceptance.

  8. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  9. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  10. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  11. Consumers’ behaviour and motives for selection of dairy beverages in Kvarner region: a pilot study

    Directory of Open Access Journals (Sweden)

    Greta Krešić

    2010-03-01

    Full Text Available Since food choice is always a unique and personal experience, consumer behaviour is important for food manufacturers and marketers in term of product success. Due to the beneficial healthprotective effects of dairy beverages, this market segment is very innovative and fast-growing. The aim of this pilot-study was to examine the consumption patterns, purchasing behaviour and motivesfor selection of dairy beverages. The sample of this study included 114 participants (44 males and 70 females which were interviewed face-to-face at the entrance of 5 shopping centres. The surveyinstrument consisted of closed questions regarding habits of consumption, purchasing habits and motives for selection of dairy beverages. Gender specific differences were tested. The results obtained have shown that females consumed more milk and milk drinks (p<0.001 and fermented milk drinks (p=0.002 than males. The consumption of whey-based beverages was sporadical in both genders. Females in higher percentage purchase low-fat dairy beverages (p=0.043, while males exhibited a higher level of loyalty to a certain product (p=0.034. Sensory appeals were the most important motivational factor for both genders. Brand was ranked second for males (p<0.001 and health aspect for females. The products’ origin was ranked third, while price was ranked fifth for both genders. The results obtained could be useful to researchers and dairy market sector in developing and promotinga group of dairy beverage products based on innovations and health.

  12. RandAgiamo™, a Pilot Project Increasing Adoptability of Shelter Dogs in the Umbria Region (Italy)

    Science.gov (United States)

    Menchetti, Laura; Mancini, Stefania; Catalani, Maria Chiara; Boccini, Beatrice; Diverio, Silvana

    2015-01-01

    Simple Summary In Italy, dog shelters are overcrowded because the rate of dog adoption is lower than that of abandonment. A project called “RandAgiamo” was implemented in a rescue shelter in central Italy. RandAgiamo provides training, socialization and advertising of adult shelter dogs. Official data of the Umbria regional health authorities from the year 2014 showed a higher rate of adoption in shelters involved in the project. RandAgiamo dogs had triple odds of being adopted compared to others housed in shelters of the same province. The increase in adoption rate can be beneficial for both dog welfare and shelter management. Abstract Current Italian legislation does not permit euthanasia of dogs, unless they are ill or dangerous. Despite good intentions and ethical benefits, this “no-kill policy” has caused a progressive overpopulation of dogs in shelters, due to abandonment rates being higher than adoption rates. Shelter overcrowding has negative implications for dog welfare and increases public costs. The aim of this paper is to describe the pilot project “RandAgiamo” implemented in a rescue shelter in the Umbria Region and to evaluate its effectiveness on the rate of dog adoption using official data. RandAgiamo aimed to increase adult shelter dogs’ adoptability by a standard training and socialization programme. It also promoted dogs’ visibility by publicizing them through social media and participation in events. We analysed the official data of the Umbria regional health authorities regarding dog shelters of the Perugia province of the year 2014. In the RandAgiamo shelter, the dog adoption rate was 27.5% higher than that of dogs housed in other shelters located in the same geographical area (p dogs’ welfare, owner satisfaction, shelter management, and public perception of shelter dogs. However, staff were required to provide dog training and related activities. PMID:26479385

  13. Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project

    International Nuclear Information System (INIS)

    Little, M.S.

    1985-05-01

    The Safety Analysis Report (SAR) for the Waste Isolation Pilot Plant (WIPP) Project was first published by the US Department of Energy (DOE), WIPP Project Office (WPO) in 1980. Since that time a total of eight amendments to this Report have been published. As part of its independent evaluation of the WIPP Project for the State of New Mexico, the Environmental Evaluation Group (EEG) maintains a continuing technical assessment of the information in this Report and its amendments. Beginning with the initial publication, and following the amendments, the EEG prepares detailed written comments and recommendations which are submitted to the WPO for consideration in future amendments. The WPO has made many substantial changes to the SAR in response to the EEG's comments. On frequent occasions, meetings between the two groups have been held in an effort to reach an accord on some of the more controversial issues. These meetings generally have been very constructive, but several important areas of conflict remain. In many instances, these areas represent changes which are to be considered by the WPO at some future date, rather than irreconcilable issues. The most important issues remaining to be resolved are included in the discussions of this report, and could be summarized as follows: (1) An amendment of the topical content to be more in accord with the DOE Order 5481.1A and AL 5481.1A. (2) Substantial revisions of the classification of components, structures and systems, and related quality assurance. (3) Revisions to the site geological and hydrologic data based on studies agreed to between DOE and the State

  14. Microseismic monitoring during Hydraulic stimulation in Pohang (Korea) for EGS pilot project

    Science.gov (United States)

    Kim, M.; Yoon, B.; Lee, C.; Park, K. G.; Yoon, W. S.; Song, Y.; Lee, T. J.

    2017-12-01

    Since the geothermal anomaly in the Pohang area has been reported in 1960s, various geological and geophysical surveys have been conducted by Korea Institute of Geoscience and Mineral Resources (KIGAM) including gravity, seismic, airborne magnetic and magneto-telluric surveys. Based on these explorations, the Enhanced Geothermal System (EGS) pilot project has been carried out in Pohang since the end of 2010. One vertical well (PX-2, MD 4,348 m) and one deviated well (PX-1, MD 4,362 m) have been drilled in granite rock for the EGS. Microseismic (MS) monitoring is the best way to understand how the fracture grows during the hydraulic stimulation. KIGAM has set up 9 shallow borehole stations (100-130 m), 4 surface stations and two borehole geophones (1,350 and 1,550 m deep) within 5 km radius from injection well for the MS monitoring during hydraulic stimulation. The first hydraulic stimulation started on January 29th to February 20th, 2016 at PX-2 and the second stimulation was conducted in PX-1 from December 15th, 2016 to January 11th, 2017. Several hundreds of MS events occurred during stimulation and the biggest event was ML 2.3 during the shut in period of the second stimulation. Based on the results of the MS monitoring, a soft stimulation is scheduled at PX-1 in cooperation with one of the European Horizon2020 project, DESTRESS (Demonstration of soft stimulation treatments of geothermal reservoirs). We will present the MS monitoring system in Pohang and the data of the stimulation with the MS monitoring results. We believe that the data from Pohang will improve the understanding of seismic behavior due to hydraulic stimulation in crystalline rocks and also will contribute to success of the Pohang EGS project.

  15. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  16. Pilot project wind power - Large scale wind power in northern Sweden; Pilotprojekt vindkraft - Storskalig vindkraft i norra Sverige

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Swedish Energy Agency granted 2009-04-20 Svevind AB financial aid to implement {sup P}ilot project wind power- Large scale wind power in northern Sweden{sup .} The purpose of the aid is to implement pilot sub-projects in wind power, to to increase knowledge for the larger establishments. The Energy Agency said in its decision that the projects Dragaliden and Gabriel Mountain is of 'great importance for future large-scale development of wind power in Sweden'. The special conditions prevailing in the project, forest environment and cold climate, gives the possibility of studies of wind turbines on birds, reindeer herding and hunting and the more technical aspects, such as de-icing and obstacle lighting. The objectives of the project, in addition to the construction and operation of 32 wind turbines, has been to include evaluating the permit process, studying the social effects around the wind power, to study the impact on small game hunting, perform tests of the de-icing system, investigate impacts on reindeer herding and explain the outcome of the project-generated rural funds. Some of the above sub-projects have been completed, which are reported in this report. For the sub-projects still in progress, the report presents the results to date, until the completion.

  17. Partitioning technologies and actinide science: towards pilot facilities in Europe (ACSEPT project)

    International Nuclear Information System (INIS)

    Bourg, S.; Hill, C.; Ouvrier, N.

    2010-01-01

    ACSEPT is an essential contribution to the demonstration, in the long term, of the potential benefits of actinide recycling to minimize the burden on the geological repositories. To succeed, ACSEPT is organized into three technical domains: (i) Considering technically mature aqueous separation processes, ACSEPT works to optimize and select the most promising ones dedicated either to actinide partitioning or to grouped actinide separation. A substantial review was undertaken either to be sure that the right molecule families are being studied, or, on the contrary, to identify new candidates. Results of the first hot tests allowed the validation of some process options. (ii) Concerning pyrochemical separation processes, ACSEPT is focused on the enhancement of the two reference cores of process selected within EUROPART with specific attention to the exhaustive electrolysis in molten chloride (quantitative recovery of the actinides with the lowest amount of fission products) and to actinide back-extraction from an An-Al alloy. R and D efforts are also brought to key scientific and technical issues compulsory for building a complete separation process (head-end steps, salt treatment for recycling and waste management). (iii) By integrating all the experimental results within engineering and systems studies, both in hydro and pyro domains, ACSEPT will deliver relevant flowsheets and recommendations to prepare for future demonstration at a pilot level, in relation with strategies developed through the SNE-TP. In addition, a training and education programme is implemented to share the knowledge among the partitioning community and the future generations of researchers

  18. PERSPECTIVE: REDD pilot project scenarios: are costs and benefits altered by spatial scale?

    Science.gov (United States)

    Carlson, Kimberly M.; Curran, Lisa M.

    2009-09-01

    Kimberly M Carlson Payments for reducing carbon emissions due to deforestation and degradation (REDD) have garnered considerable global interest and investments. These financial incentives aim to alter the drivers of land use change by reducing opportunity costs of retaining forest cover, and are often promoted as multipartite solutions that not only generate profits and reduce carbon emissions but provide benefits for human development and biodiversity. Currently, the United Nations Framework Convention on Climate Change (UNFCCC) is debating a post-Kyoto protocol with national or sub-national emission reduction targets. Anticipating the inclusion of REDD in this agreement, >80% of pilot REDD projects are being established in tropical regions (table 1). While the capacity of REDD projects to meet their stated objectives must be assessed post- implementation, land use change models are powerful tools for generating potential outcomes from these pilot initiatives. Table 1. Extent and emissions reductions for all REDD projects as reported by Ecosystem Marketplace, which maintains a comprehensive and up-to-date inventory of REDD projects that are selling credits and/or are verified by a third-party verifier. Adapted from Forest Carbon Portal (2009). Geographical zoneContinentProjects (#) Area (km2) Emissions reductions (Mt C) Tropical and Subtropical Africa2775019.50 Asia28100109.60 South America 9183 880278.24 TemperateAustralia1140.18 North America115N/A Totals15199 759407.52 In this issue of ERL, Gaveau et al (2009) use a spatially-explicit model to explore the potential of a REDD pilot project in northern Sumatra, Indonesia, to reduce deforestation and conserve orangutan biodiversity. This project is conceived by the Provincial Government of Aceh, financed by Merrill Lynch, and co-managed by carbon trading firm Carbon Conservation and NGO Flora and Fauna International. Project managers estimate CO2 emissions reductions at 3.4 Mt y-1 over 30 years across a 7500 km2

  19. Evaluation of the midwifery pilot projects in Quebec: an overview. L'Equipe d'Evaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Blais, R; Joubert, P

    2000-01-01

    In 1990, the province of Quebec adopted a law authorizing the evaluation of the practice of midwifery through eight pilot projects. The projects, which took the form of birth centres outside hospitals, started operating in 1994. The objectives of the evaluation were 1) to compare midwives' services to current physician services with regard to maternal and neonatal mortality and morbidity, the use of obstetrical intervention, individualization and continuity of care as perceived by clients, and cost; and 2) to identify the professional and organizational factors associated with the integration of midwives into the health care system. A mixed evaluative design was used: a multiple case study with each pilot project representing a case and a cohort study where 1,000 women followed by midwives in the birth centres were matched with 1,000 women followed by physicians in the usual hospital-based services. Various quantitative and qualitative data collection instruments were used. Overall, many results were favourable to midwifery practice, while some were favourable to medical care. Following the evaluation, the Government of Quebec decided to legalize the practice of midwifery.

  20. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    OpenAIRE

    Duim, van der, V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that the tangible results in terms of pro-poor tourism of the project itself were meagre, as, initially, only three and later only one out of 24 projects was included in the tourism chain. However, the an...

  1. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat

  2. Fort Cobb Reservoir Watershed, Oklahoma and Thika River Watershed, Kenya Twinning Pilot Project

    Science.gov (United States)

    Moriasi, D.; Steiner, J.; Arnold, J.; Allen, P.; Dunbar, J.; Shisanya, C.; Gathenya, J.; Nyaoro, J.; Sang, J.

    2007-12-01

    Nairobi. A dam was constructed in 1994 with a water reservoir of 70 million m3. Thika River also supplies water to Masinga Reservoir to supply the seven forks dams, which together supply 75% of the nation's electricity. The quantity of water in rivers and reservoirs is decreased due to sedimentation while water quality is degraded by sediments, and sediment-borne nutrients and pesticides. The focus of this pilot twinning project is watershed erosion and reservoir sedimentation assessment. This will be accomplished by (1) a rapid watershed/catchment erosion assessment using ground based measurements and remote sensing/GIS techniques, 2) use of Acoustic Profiling Systems (APS) for reservoir sedimentation measurement studies, and 3) advanced water quality modeling using the soil and water assessment tool (SWAT) model. Data acquired will be used for sediment transport modeling to1) determine sediment "hot spots" and management practices that will minimize sediments into reservoirs in order to 2) maintain the reservoirs on which many farmers depend for their livelihood and a cleaner environment. This project will provide an opportunity for 1) sharing knowledge and experience among the stakeholders, 2) building capacity through formal and informal education opportunities through reciprocal hosting of decision makers and water experts, and 3) technology transfer of pilot results with recommended management practices to reduce reservoir sedimentation rates.

  3. Enhancement of medical student performance through narrative reflective practice: a pilot project

    Directory of Open Access Journals (Sweden)

    Alan Thomson

    2013-03-01

    Full Text Available Background: Narrative Reflective Practice (NRP is a process that helps medical students become better listeners and physicians. We hypothesized that NRP would enhance students’ performance on multiple choice question exams (MCQs, on objective structured clinical examinations (OSCEs, and on subjective clinical evaluations (SCEs. Methods: The MCQs, OSCEs and SCEs test scores from 139 third year University of Alberta medical students from the same class doing their Internal Medicine rotation were collected over a 12 month period. All preceptors followed the same one-hour clinical teaching format, except for the single preceptor who incorporated 2 weeks of NRP in the usual clinical teaching of 16 students. The testing was done at the end of each 8-week rotation, and all students within each cohort received the same MCQs, OSCE and SCEs Results: Independent t-tests were used to assess group differences in the mean MCQ, OSCE and SCE scores. The group receiving NRP training scored 4.7 % higher on the MCQ component than those who did not. The mean differences for OSCE and SCE scores were non-significant. Conclusions: Two weeks NRP exposure produced an absolute increase in students’ MCQ score. Longer periods of NRP exposure may also increase the OSCE and SCE scores. This promising pilot project needs to be confirmed using several trained preceptors and trainees at different levels of their clinical experience.

  4. Solid sample atomic absorption spectroscopy in a chemical contaminant monitoring pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Klein, J.; Schmidt, H.; Dirscherl, C.; Muntau, H.

    1987-09-01

    The Institute for Technology and Hygiene of Food of Animal Origin is developing a practible system of monitoring the distribution of toxic substances in the environment, using the dairy cows as bioindicators. A pilot project has been established to solve basic problems as sampling strategy, sample preparation, analysis and data handling. In the preliminary stage of this study the new technique of SS-AAS turned out to be a useful tool. In order to test overall analytical reliability of the data obtained all analytical procedures applied for the different matrices are controlled by the use of reference material of similar matrix compositions. Results of studies on the distribution of admium and lead are reported; the representativity of small sample amounts of cortical tissue (50-60 mg and 1-2 mg dry mass) has additionally been investigated. Direct analysis of wet tissue aliquots (5-10 mg) was not feasible. A possible method of sample preparation of wet tissue is presented which yields reliable results within 10 min of operation time.

  5. Innovative model of delivering quality improvement education for trainees – a pilot project

    Directory of Open Access Journals (Sweden)

    Kannan Ramar

    2015-09-01

    Full Text Available Background: After incorporating quality improvement (QI education as a required curriculum for our trainees in 2010, a need arose to readdress our didactic sessions as they were too long, difficult to schedule, and resulting in a drop in attendance. A ‘flipped classroom’ (FC model to deliver QI education was touted to be an effective delivery method as it allows the trainees to view didactic materials on videos, on their own time, and uses the classroom to clarify concepts and employ learned tools on case-based scenarios including workshops. Methods: The Mayo Quality Academy prepared 29 videos that incorporated the previously delivered 17 weekly didactic sessions, for a total duration of 135 min. The half-day session clarified questions related to the videos, followed by case examples and a hands-on workshop on how to perform and utilize a few commonly used QI tools and methods. Results: Seven trainees participated. There was a significant improvement in knowledge as measured by pre- and post-FC model test results [improvement by 40.34% (SD 16.34, p<0.001]. The survey results were overall positive about the FC model with all trainees strongly agreeing that we should continue with this model to deliver QI education. Conclusions: The pilot project of using the FC model to deliver QI education was successful in a small sample of trainees.

  6. Risk assessment of chemicals in foundries: The International Chemical Toolkit pilot-project

    International Nuclear Information System (INIS)

    Ribeiro, Marcela G.; Filho, Walter R.P.

    2006-01-01

    In Brazil, problems regarding protection from hazardous substances in small-sized enterprises are similar to those observed in many other countries. Looking for a simple tool to assess and control such exposures, FUNDACENTRO has started in 2005 a pilot-project to implement the International Chemical Control Toolkit. During the series of visits to foundries, it was observed that although many changes have occurred in foundry technology, occupational exposures to silica dust and metal fumes continue to occur, due to a lack of perception of occupational exposure in the work environment. After introducing the Chemical Toolkit concept to the foundry work group, it was possible to show that the activities undertaken to improve the management of chemicals, according to its concept, will support companies in fulfilling government legislations related to chemical management, occupational health and safety, and environmental impact. In the following meetings, the foundry work group and FUNDACENTRO research team will identify 'inadequate work situations'. Based on the Chemical Toolkit, improvement measures will be proposed. Afterwards, a survey will verify the efficency of those measures in the control of hazards and consequently on the management of chemicals. This step is now in course

  7. Healthier snacks in school vending machines: a pilot project in four Ontario high schools.

    Science.gov (United States)

    Callaghan, Christine; Mandich, Gillian; He, Meizi

    2010-01-01

    The Healthy Vending Machine Pilot Project (HVMPP) was a public health initiative intended to create a healthier school nutrition environment by making healthier snacks available in vending machines, while maintaining a profit margin. The HVMPP was evaluated using quantitative and qualitative measures. Vending machines were stocked with healthier choices and conventional vending products at a 50:50 ratio. The HVMPP was implemented from February to May 2007 in four Ontario secondary schools in Middlesex-London, Elgin, and Oxford counties. Product sales were tracked, and focus groups were conducted to obtain students' opinions about healthy eating and vending choices. "Healthier choice" sales ranged from 14% to 17%. In all schools, vending revenues declined from 0.7% to 66%. A majority of participants had substantial knowledge of healthy eating and were in favour of healthier choices in vending machines; however, price, value, and taste were barriers that led them to purchase these products rarely. Students preferred to have "real" healthy snacks, such as yogurt, fruit, and vegetables, available in schools. Replacing 50% of vending stock with healthier snacks resulted in a decline in vending revenues. Future health programs in schools need to provide "real" healthy snacks, such as low-fat dairy products, fruits, and vegetables.

  8. Human error analysis project (HEAP) - The fourth pilot study: verbal data for analysis of operator performance

    International Nuclear Information System (INIS)

    Braarud, Per Oeyvind; Droeyvoldsmo, Asgeir; Hollnagel, Erik

    1997-06-01

    This report is the second report from the Pilot study No. 4 within the Human Error Analyses Project (HEAP). The overall objective of HEAP is to provide a better understanding and explicit modelling of how and why ''cognitive errors'' occur. This study investigated the contribution from different verbal data sources for analysis of control room operator's performance. Operator's concurrent verbal report, retrospective verbal report, and process expert's comments were compared for their contribution to an operator performance measure. This study looked into verbal protocols for single operator and for team. The main findings of the study were that all the three verbal data sources could be used to study performance. There was a relative high overlap between the data sources, but also a unique contribution from each source. There was a common pattern in the types of operator activities the data sources gave information about. The operator's concurrent protocol overall contained slightly more information on the operator's activities than the other two verbal sources. The study also showed that concurrent verbal protocol is feasible and useful for analysis of team's activities during a scenario. (author)

  9. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  10. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  11. Pilot projects for the remediation of Sillamaee uranium tailings in Estonia

    International Nuclear Information System (INIS)

    Kaasik, T.; Siinmaa, A.

    2001-01-01

    First Estonian uranium, produced in a pilot plant at Narva, was presented to Soviet military administration in 1945 and just a year later - 1946 - installation of an uranium production plant was started at Sillamaee, Estonia. Estonian local ore - alum shale - containing only 0,026% of uranium was used for uranium production for nearly five years, after the plant was launched in 1948. The uranium mine, having been activated from 1947 to 1952, was left in status of 'active conservation' for 17 years, until finally closed in 1969. Potential threats of this hidden legacy have never been revealed. After close-down of local uranium mine, more than 4 million tons of ore, imported mostly from Central and East European countries: Czechoslovakia, Hungary and Eastern Germany were processed at Sillamaee. These activities have left a large tailings impoundment with the total volume of ca. 8 million cubic meters in the immediate vicinity of the Baltic Sea. Today the plant is privatized, converted to civil purposes and provides together its power generating facilities ca. 1200 jobs in the socially sensitive area of North-East Estonia, while environmental hazards of the history, however, remain: - Continuous seepage of tailing waters into the sea contributes and would contribute over long term to the pollution of the Baltic Sea; - stability of the tailings dam seaside under present conditions can not be guaranteed thus risking a sudden release of partly liquid tailings due to potential dam failure; - uncovered surface of the tailings presents a health hazard due to dusting and radon release and hinders the revitalization of the area. The conceptual design of the Estonia's largest environmental remediation project, done by Wismut, is now complete and first implementation steps are underway. The project for mine area restoration is in initiation phase; it shall reveal the current and potential environmental hazards of the facility and create the concept for necessary rehabilitation

  12. An Introduction to the Tibet cGPS pilot project: TigiCAS

    Science.gov (United States)

    Zhang, Z.; Liu, J.; Galetzka, J.; Avouac, J.; Tapponnier, P.; Zeng, L.; Gan, W.; Shen, Z.; Wang, M.

    2007-12-01

    The convergence between India and Eurasia is the¡¡prototype of continental collision in action. Compared¡¡to geological history and fault kinematics studies, the present-day, regional pattern of strain-partitioning¡¡is still inadequately known. Among limited geodetic¡¡efforts in the past decade or two, most have been focused¡¡on refining measurements of the current crustal¡¡shortening rate across the Himalaya. The vast region¡¡immediately to the north is sparsely instrumented, with only one continuous GPS station (Lhasa) within¡¡the plateau proper. Campaign stations are few and¡¡ill-positioned, mostly along major roads, providing¡¡poor constraints on present-day slip-rates on individual¡¡active faults. The extant GPS network configuration is thus still insufficient to discriminate between block vs continuum deformation. In November 2006, the¡¡Chinese Academy of Sciences led a pilot program and¡¡installed 6 continuous GPS stations in southern Tibet, crossing the NS-trending normal fault systems and¡¡complementing the Nepal cGPS profiles. We present¡¡here the new sites, preliminary data processing results, and the spatial relationship with ongoing or planned¡¡continuous GPS sites from a couple of other projects. Together with such projects, TigiCAS will provide¡¡a substantial increase in geodetic data in the¡¡Himalayan-Tibet convergent belt in the next few¡¡years, and lead to a better understanding of¡¡contemporary deformation of the region.

  13. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  14. Future-oriented computerized information system for power plant process control in a pilot project at Philippsburg nuclear power plant

    International Nuclear Information System (INIS)

    Woehrle, G.; Kraft, M.

    1988-01-01

    The motivation for the pilot project at Philippsburg nuclear power plant resulted from the Three Mile Island accident in 1979. The primary task embraces an efficient computer-aided reduction of information when a fault occurs based on a process engineering analysis of the information accrued. Accompanying this are a consolidation and evaluation of the information available in the control room. In this pilot project the new tasks of status monitoring, information reduction and operationalcontrol have been realized for the first time using a computer-aided process information system. In addition to the existing control computer, an information computer with approximately 1200 analogue and about 10000 binary signals has been installed. The installation of the system was completed in 1984 and in the meantime initial operational experience has become available. (orig.) [de

  15. Selective absorption pilot plant for decontamination of fuel reprocessing plant off-gas

    Energy Technology Data Exchange (ETDEWEB)

    Stephenson, M.J.; Eby, R.S.; Huffstetler, V.C.

    1977-10-01

    A fluorocarbon-based selective absorption process for removing krypton-85, carbon-14, and radon-222 from the off-gas of conventional light water and advanced reactor fuel reprocessing plants is being developed at the Oak Ridge Gaseous Diffusion Plant in conjunction with fuel recycle work at the Oak Ridge National Laboratory and at the Savannah River Laboratory. The process is characterized by an especially high tolerance for many other reprocessing plant off-gas components. This report presents detailed drawings and descriptions of the second generation development pilot plant as it has evolved after three years of operation. The test facility is designed on the basis of removing 99% of the feed gas krypton and 99.9% of the carbon and radon, and can handle a nominal 15 scfm (425 slm) of contaminated gas at pressures from 100 to 600 psig (7.0 to 42.2 kg/cm/sup 2/) and temperatures from minus 45 to plus 25/sup 0/F (-43 to -4/sup 0/C). Part of the development program is devoted to identifying flowsheet options and simplifications that lead to an even more economical and reliable process. Two of these applicative flowsheets are discussed.

  16. Pilot plant experience on anaerobic codigestion of source selected OFMSW and sewage sludge.

    Science.gov (United States)

    Cabbai, Valentina; De Bortoli, Nicola; Goi, Daniele

    2016-03-01

    Anaerobic codigestion of source selected organic fraction of municipal solid waste (SS-OFMSW) and sewage sludge may be one of the most viable solutions to optimize oversized digesters efficiency in wastewater treatment plants. Based on results of BMP tests obtained for sewage sludge and SS-OFMSW, pilot plant tests were carried out by 3.4 m(3) CSTR reactor at mesophilic temperature. A mix of fruit and vegetable waste from wholesale market and canteen waste was used as SS-OFMSW substrate. Tests were conducted applying an OLR (organic loading rate) ramp with 6 different phases until a value of 3.2 kgVS/m(3) d. Feedstock and digestate characteristics, efficiency and process parameters were monitored. The anaerobic codigestion development was stable in each phase: early indicators like VFA (volatile fatty acids) and FOS/TAC ratio were always below instability threshold values. The maximum OLR tested determined a GPR (gas production rate) of 0.95 N m(3)/m(3) d and SGP (specific gas production) of 0.49 N m(3)/kgVS with a VS abatement of 67.3%. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Performance evaluation of restaurant food waste and biowaste to biogas pilot projects in China and implications for national policy.

    Science.gov (United States)

    De Clercq, Djavan; Wen, Zongguo; Fan, Fei

    2017-03-15

    The objective of this research was to conduct a performance evaluation of three food waste/biowaste-to-biogas pilot projects across 7 scenarios in China based on multi-criteria decision analysis (MCDA) methodology. The projects ranked included a food waste-biogas project in Beijing, a food waste-biogas project in Suzhou and a co-digestion project producing biomethane in Hainan. The projects were ranked from best to worst based on technical, economic and environmental criteria under the MCDA framework. The results demonstrated that some projects are encountering operational problems. Based on these findings, six national policy recommendations were provided: (1) shift away from capital investment subsidies to performance-based subsidies; (2) re-design feed in tariffs; (3) promote bio-methane and project clustering; (4) improve collection efficiency by incentivizing FW producers to direct waste to biogas projects; (5) incentivize biogas projects to produce multiple outputs; (6) incentivize food waste-based projects to co-digest food waste with other substrates for higher gas output. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  19. HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    HERTING DL

    2008-09-16

    The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

  20. STEM Pilot Project Grant Program: Report to the Legislature, June 2016

    Science.gov (United States)

    Noahr, Lorrell; Black, Scott; Rogers, Justin

    2016-01-01

    The Washington State Legislature established the Science, Technology, Engineering, & Math (STEM) Pilot Program in the 2015-2017 capital budget (Chapter 3, Laws of 2015, 3rd Sp. Session, Section 5026) and provided $12,500,000 for this pilot grant program. Grants awarded under this program constitute the districts' local funding for purposes of…

  1. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  2. Pilot project 'Karst water Dachstein'. Vol. 2: karst hydrology and contamination risk in springs

    International Nuclear Information System (INIS)

    Scheidleder, A.; Mandl, G.W.; Boroviczeny, F.; Hofmann, T.; Schubert, G.; Trimborn, P.; Stichler, W.; Graf, W.

    2001-01-01

    The pilot project 'Karstwasser Dachstein' aimed to ascertain the karst groundwater quality of one of the largest karst massifs in Austria, to examine and quantity the factors influencing karst groundwater quality and to gain experience in the monitoring of karst groundwater quality (Austrian Water Quality Monitoring System). The first phase of the pilot project examined comprehensively the factors influencing and the potential threats endangering karst water quality and was finished in 1994 with Vol. 1 entitled 'Karstwasserqualitaet' (HERLICSKA and LORBEER). The present study is based on the findings of the first phase of the project and aims to combine, analyze and assess the extensive quantity of data material with, special emphasis on karst hydrology and the contamination risk in springs. The interdisciplinary data analysis and the hydrogeological interpretation were carried out by the Austrian Federal Environment Agency (UBA), the Geological Survey of Austria (GBA) and the National Research Centre for Environment and Health (GSF). Their work was based on the detailed description of the geological conditions in the Dachstein area, on the thorough examination of chemical and physical spring water parameters, an isotope analyses of precipitation and spring waters as well as on the results of several tracer experiments and an investigations of the potential impacts of human activities. Investigations of the bacteriological contamination of the spring waters showed that there were only 6 out of 42 springs where there was no evidence of coliform bacteria or faecal germs. These 6 springs are all situated in the southern part of the Dachstein massif. For the analyses carried out to determine the content of chlorinated hydrocarbons, detection limits had been set very low. In all springs, evidence of chlorinated hydrocarbons was found at least once. These concentrations were all below the maximum allowable concentrations set out in the Groundwater Threshold Value

  3. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  4. ISSUES REGARDING THE FINANCIAL FLOW PROJECTIONS IN THE SELECTION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2015-06-01

    Full Text Available For a company, through investment activities, it is followed to either create new abilities or expand the existing abilities, the partial or complete replacement of existing technical base or its modernization. In the condition that it is desired the creation of a technical base, the investment involves the purchase of fixed capital that can materialize in: buildings, special buildings, land, vehicles, facilities, equipment, etc. In terms of expansion and modernization, investment implies the existence of a material base on which should be intervened wholly or partly by its development or modernization. For the selection of investment projects in the context of investment strategy established at enterprise level through a Financial justification and prioritization of investments this should lead to the achievement of the objectives set at its level.

  5. Implementing learnerships: learner recruitment and selection B ...

    African Journals Online (AJOL)

    Implementing learnerships: learner recruitment and selection B lessons learnt from the KwaZulu-Natal pilot projects. ... 2001 in KwaZulu-Natal, with specific reference to the recruitment and selection of learners. ... AJOL African Journals Online.

  6. A framework for considering climate change in transportation and land use scenario planning : lessons learned from an interagency pilot project on Cape Cod.

    Science.gov (United States)

    2011-07-01

    The Interagency Transportation, Land Use, and Climate Change Pilot Project utilized a scenario planning process to develop a multi-agency transportation- and land use-focused development strategy for Cape Cod, Massachusetts, with the intention of ach...

  7. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant (Mechanical fabrication)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper prepared plans of the mechanical equipment in the detailed design of a pilot plant in the joint research project on the environmental protection technology for highly efficient mineral resource extraction and treatment. (NEDO)

  8. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  9. Job Sharing Pilot Project in the Department of Education: Final Evaluation. A Report to the Legislature of the State of Hawaii. No. 81-10.

    Science.gov (United States)

    Tanimura, Clinton T.

    Evaluation of a three-year pilot project in the Hawaii Department of Education focused on the extent to which it demonstrated the feasibility of job sharing as an employment alternative for classroom teachers. It also assessed project effectiveness, examined costs incurred by the project, and analyzed job sharing as a permanent employment option…

  10. The LEONARDO-DA-VINCI pilot project "e-learning-assistant" - Situation-based learning in nursing education.

    Science.gov (United States)

    Pfefferle, Petra Ina; Van den Stock, Etienne; Nauerth, Annette

    2010-07-01

    E-learning will play an important role in the training portfolio of students in higher and vocational education. Within the LEONARDO-DA-VINCI action programme transnational pilot projects were funded by the European Union, which aimed to improve the usage and quality of e-learning tools in education and professional training. The overall aim of the LEONARDO-DA-VINCI pilot project "e-learning-assistant" was to create new didactical and technical e-learning tools for Europe-wide use in nursing education. Based on a new situation-oriented learning approach, nursing teachers enrolled in the project were instructed to adapt, develop and implement e- and blended learning units. According to the training contents nursing modules were developed by teachers from partner institutions, implemented in the project centers and evaluated by students. The user-package "e-learning-assistant" as a product of the project includes two teacher training units, the authoring tool "synapse" to create situation-based e-learning units, a student's learning platform containing blended learning modules in nursing and an open sourced web-based communication centre. Copyright 2009 Elsevier Ltd. All rights reserved.

  11. ExoGeoLab Pilot Project for Landers, Rovers and Instruments

    Science.gov (United States)

    Foing, Bernard

    2010-05-01

    We have developed a pilot facility with a Robotic Test Bench (ExoGeoLab) and a Mobile Lab Habitat (ExoHab). They can be used to validate concepts and external instruments from partner institutes. The ExoGeoLab research incubator project, has started in the frame of a collaboration between ILEWG (International Lunar Exploration working Group http://sci.esa.int/ilewg), ESTEC, NASA and academic partners, supported by a design and control desk in the European Space Incubator (ESI), as well as infrastructure. ExoGeoLab includes a sequence of technology and research pilot project activities: - Data analysis and interpretation of remote sensing and in-situ data, and merging of multi-scale data sets - Procurement and integration of geophysical, geo-chemical and astrobiological breadboard instruments on a surface station and rovers - Integration of cameras, environment and solar sensors, Visible and near IR spectrometer, Raman spectrometer, sample handling, cooperative rovers - Delivery of a generic small planetary lander demonstrator (ExoGeoLab lander, Sept 2009) as a platform for multi-instruments tests - Research operations and exploitation of ExoGeoLab test bench for various conceptual configurations, and support for definition and design of science surface packages (Moon, Mars, NEOs, outer moons) - Field tests of lander, rovers and instruments in analogue sites (Utah MDRS 2009 & 2010, Eifel volcanic park in Sept 2009, and future campaigns). Co-authors, ILEWG ExoGeoLab & ExoHab Team: B.H. Foing(1,11)*#, C. Stoker(2,11)*, P. Ehrenfreund(10,11), L. Boche-Sauvan(1,11)*, L. Wendt(8)*, C. Gross(8, 11)*, C. Thiel(9)*, S. Peters(1,6)*, A. Borst(1,6)*, J. Zavaleta(2)*, P. Sarrazin(2)*, D. Blake(2), J. Page(1,4,11), V. Pletser(5,11)*, E. Monaghan(1)*, P. Mahapatra(1)#, A. Noroozi(3), P. Giannopoulos(1,11) , A. Calzada(1,6,11), R. Walker(7), T. Zegers(1, 15) #, G. Groemer(12)# , W. Stumptner(12)#, B. Foing(2,5), J. K. Blom(3)#, A. Perrin(14)#, M. Mikolajczak(14)#, S. Chevrier(14

  12. Piloting a community-based micro-hydro power generation project

    International Nuclear Information System (INIS)

    Buenafe, Menandro B.; Eponio, Melchor P.

    1998-01-01

    A community based microhydro power generation project was successfully piloted in Dulao, Malibcong, Abra. The project started with the identification and evaluation of five potential creeks flowing near villages in the Cordillera hinterlands. All the sites showed comparative hydrologic features except for one factor that decided the project's implementation: the willingness of the people to invest by providing their labor- counterpart. On this account, only the residents of Dulao put their full trust in the implementing institutions, the main reason for the project's success. The micro-hydro power project consisted of an earthen diversion canal that conveyed part of the streamflow unto a forebay located above the powerhouse. The forebay was built of riprap and concrete, equipped with a desilting chamber, trashrack, a spillway, and an overflow canal that directed water to the ricefields downstream. A polyethylenevinyl penstock was laid underground along the slope,from the forebay to the powerhouse. The penstock assumed a Y-configuration inside the powerhouse where the two crossflow turbines were separately mounted on each arms. Two butterfly valves were positioned just before each turbine so that flow can be alternately controlled for the two machines. A tailrace drained the discharge from the turbines back to the same creek. Originally, the setup could only operate the 3kw turbine that ran the ricemill by means of a flat belt drive. Upon further hydrologic study, an 8kw crossflow turbine was installed to a drive a 7.5kva, two-pole, single phase alternator. The 8kw turbine can operate under three design flows, namely: 20,40, and 60 liters per second. The turbine-alternator setup was achieved by a pulley and belt drive arrangement. Typically, the AC generator was provided with monitoring instruments like a volt meter, frequency meter, and ampere meter. An electronic load controller (ELC) was observed to effectively protect the alternator from runaway speeds, over

  13. Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

  14. Sequence Analysis and Characterization of Active Human Alu Subfamilies Based on the 1000 Genomes Pilot Project.

    Science.gov (United States)

    Konkel, Miriam K; Walker, Jerilyn A; Hotard, Ashley B; Ranck, Megan C; Fontenot, Catherine C; Storer, Jessica; Stewart, Chip; Marth, Gabor T; Batzer, Mark A

    2015-08-29

    The goal of the 1000 Genomes Consortium is to characterize human genome structural variation (SV), including forms of copy number variations such as deletions, duplications, and insertions. Mobile element insertions, particularly Alu elements, are major contributors to genomic SV among humans. During the pilot phase of the project we experimentally validated 645 (611 intergenic and 34 exon targeted) polymorphic "young" Alu insertion events, absent from the human reference genome. Here, we report high resolution sequencing of 343 (322 unique) recent Alu insertion events, along with their respective target site duplications, precise genomic breakpoint coordinates, subfamily assignment, percent divergence, and estimated A-rich tail lengths. All the sequenced Alu loci were derived from the AluY lineage with no evidence of retrotransposition activity involving older Alu families (e.g., AluJ and AluS). AluYa5 is currently the most active Alu subfamily in the human lineage, followed by AluYb8, and many others including three newly identified subfamilies we have termed AluYb7a3, AluYb8b1, and AluYa4a1. This report provides the structural details of 322 unique Alu variants from individual human genomes collectively adding about 100 kb of genomic variation. Many Alu subfamilies are currently active in human populations, including a surprising level of AluY retrotransposition. Human Alu subfamilies exhibit continuous evolution with potential drivers sprouting new Alu lineages. © The Author(s) 2015. Published by Oxford University Press on behalf of the Society for Molecular Biology and Evolution.

  15. Performance analysis and pilot plant test results for the Komorany fluidized bed retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Snow, G.C. [POWER International, Inc., Coeur d`Alene, ID (United States)

    1995-12-01

    Detailed heat and mass balance calculations and emission performance projections are presented for an atmospheric fluidized bed boiler bottom retrofit at the 927 MWt (steam output) Komorany power station and district heating plant in the Czech Republic. Each of the ten existing boilers are traveling grate stoker units firing a local, low-rank brown coal. This fuel, considered to be representative of much of the coal deposits in Central Europe, is characterized by an average gross calorific value of 10.5 MJ/kg (4,530 Btu/lb), an average dry basis ash content of 47 %, and a maximum dry basis sulfur content of 1.8 % (3.4 % on a dry, ash free basis). The same fuel supply, together with limestone supplied from the region will be utilized in the retrofit fluidized bed boilers. The primary objectives of this retrofit program are, (1) reduce emissions to a level at or below the new Czech Clean Air Act, and (2) restore plant capacity to the original specification. As a result of the AFBC retrofit and plant upgrade, the particulate matter emissions will be reduced by over 98 percent, SO{sub 2} emissions will be reduced by 88 percent, and NO{sub x} emissions will be reduced by 38 percent compared to the present grate-fired configuration. The decrease in SO{sub 2} emissions resulting from the fluidized bed retrofit was initially predicted based on fuel sulfur content, including the distribution among organic, pyritic, and sulfate forms; the ash alkalinity; and the estimated limestone calcium utilization efficiency. The methodology and the results of this prediction were confirmed and extended by pilot scale combustion trials at a 1.0 MWt (fuel input), variable configuration test facility in France.

  16. Medium - Scale Projects Selection Using Multi-Objective Decision ...

    African Journals Online (AJOL)

    Sixty (60) questionnaires were administered to experienced technically oriented personnel in the study area for evaluating objective weights attached to various projects. Forty-five responded and their values of objective weights attached to project cost, environmental effects, reliability, implementability and sustainable ...

  17. Poverty and Gender Perspective in Productive Projects for Rural Women in Mexico: Impact Evaluation of a Pilot Project

    Science.gov (United States)

    Urquieta-Salomon, Jose E.; Tepichin-Valle, Ana Maria; Tellez-Rojo, Martha Maria

    2009-01-01

    The objective of this study is to evaluate the impact of a pilot study that promoted productive and capacity-building activities among deprived rural women of Mexico. The evaluation design is observational; 1,278 women are interviewed, and the comparison group is estimated by propensity score matching. The results show a positive impact on the…

  18. The GODAE High Resolution Sea Surface Temperature Pilot Project (GHRSST-PP)

    Science.gov (United States)

    Donlon, C.; Ghrsst-Pp Science Team

    2003-04-01

    This paper summarises Development and Implementation Plan of the GODAE High Resolution Sea Surface Temperature Pilot Project (GHRSST-PP). The aim of the GHRSST-PP is to coordinate a new generation of global, multi-sensor, high-resolution (better than 10 km and 12 hours) SST products for the benefit of the operational and scientific community and for those with a potential interest in the products of GODAE. The GHRSST-PP project will deliver a demonstration system that integrates data from existing international satellite and in situ data sources using state-of-the-art communications and analysis tools. Primary GHRSST-PP products will be generated by fusing infrared and microwave satellite data obtained from sensors in near polar, geostationary and low earth orbits, constrained by in situ observations. Surface skin SST, sub-surface SST and SST at depth will be produced as both merged and analysed data products. Merged data products have a common grid but all input data retaining their error statistics whereas analysed data products use all data to derive a best estimate data source having one set of error statistics. Merged SST fields will not be interpolated thereby preserving the integrity of the source data as much as possible. Products will be first produced and validated using in situ observations for regional areas by regional data assembly centres (RDAC) and sent to a global data analysis centre (GDAC) for integration with other data to provide global coverage. GDAC and RDAC will be connected together with other data using a virtual dynamic distributed database (DDD). The GDAC will merge and analyse RDAC data together with other data (from the GTS and space agencies) to provide global coverage every 12 hours in real time. In all cases data products will be accurate to better than 0.5 K validated using data collected at globally distributed diagnostic data set (DDS) sites. A user information service (UIS) will work together with user applications and services

  19. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    International Nuclear Information System (INIS)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG ampersand G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory's (INEL's) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG ampersand G Idaho is responsible concerning the INEL WETP. Even though EG ampersand G Idaho has no responsibility for the work that ANL-W is performing, EG ampersand G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and

  20. Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

    Science.gov (United States)

    Hnottavange-Telleen, K.; Chabora, E.; Finley, R.J.; Greenberg, S.E.; Marsteller, S.

    2011-01-01

    by the Severity of negative impact. L and S are each evaluated on five-point scales, yielding a theoretical spread in risk values of 1 through 25. So defined, these judgment-based values are categorical and ordinal - they do not represent physically measurable quantities, but are nonetheless useful for comparison and therefore decision support. The "risk entities" first evaluated are FEPs - conceptual Features, Events, and Processes based on the list published by Quintessa Ltd. After concrete scenarios are generated based on selected FEPs, scenarios become the critical entities whose associated risks are evaluated and tracked. In IBDP workshops, L and S values for 123 FEPs were generated through expert elicitation. About 30 experts in the project or in GS in general were assigned among six facilitated working groups, and each group was charged to envision risks within a sphere of project operations. Working groups covered FEPs with strong spatial characteristics - such as those related to the injection wellbore and simulated plume footprint - and "nonspatial" FEPs related to finance, regulations, legal, and stakeholder issues. Within these working groups, experts shared information, examined assumptions, refined and extended the FEP list, calibrated responses, and provided initial L and S values by consensus. Individual rankings were collected in a follow-up process via emailed spreadsheets. For each of L and S, three values were collected: Lower Bound, Best Guess, and Upper Bound. The Lower-Upper Bound ranges and the spreads among experts can be interpreted to yield rough confidence measures. Based on experts' responses, FEPs were ranked in terms of their L*S risk levels. FEP rankings were determined from individual (not consensus or averaged) results, thus no high-risk responses were damped out. The higher-risk FEPs were used to generate one or more concrete, well defined risk-bearing scenarios for each FEP. Any FEP scored by any expert as having associated risk of

  1. Soil-biological, soil-chemical and soil-physical parameters along a pollutant gradient on grassland sites in the vicinity o Brixlegg (Tyrol) - a pilot project

    International Nuclear Information System (INIS)

    Pohla, H.; Palzenberger, M.; Krassnigg, F.; Kandeler, E.; Schwarz, S.; Kasperowski, E.

    1992-01-01

    It was the main aim of this pilot project to check the indicator value of soil organisms by means of distinct pollutant gradients - heavy metals, organic compounds (PCB, dioxins) -. On the basis of available results (1/2/3/), 4 grassland sites at increasing distances from a local emission source (copper production from scrap metal) were selected. Physical and chemical analyses as well as the quantification of habitat structures were used for the characterization of the sites. The following analyses were carried out accompanyingly: The performances of soil microorganisms under pollutant load, the accumulation of pollutants, and the structures of plants and animal communities (macro, meso and microfauna). The investigation area and the examined parameters are introduced, as well as first result on soil chemistry and enzymatics as well as for the accumulation of heavy metals in an earthworm species are introduced. (orig.) [de

  2. The Establishment of the Colombian Integrated Program for Antimicrobial Resistance Surveillance (COIPARS): A Pilot Project on Poultry Farms, Slaughterhouses and Retail Market.

    Science.gov (United States)

    Donado-Godoy, P; Castellanos, R; León, M; Arevalo, A; Clavijo, V; Bernal, J; León, D; Tafur, M A; Byrne, B A; Smith, W A; Perez-Gutierrez, E

    2015-04-01

    The development of antimicrobial resistance among bacteria (AMR) is currently one of the world's most pressing public health problems. The use of antimicrobial agents in humans and animals has resulted in AMR which has narrowed the potential use of antibiotics for the treatment of infections in humans. To monitor AMR and to develop control measures, some countries, such as the USA, Canada and Denmark, have established national integrated surveillance systems (FDA, , CIPARS, 2007, DANMAP,2002). The components of these programs monitor changes in susceptibility/resistance to antimicrobial agents of selected zoonotic pathogens and commensal organisms recovered from animals, retail meats and humans. The rapid development of Colombia's animal production industry has raised food safety issues including the emergence of antibiotic resistance. The Colombian Integrated Surveillance Program for Antimicrobial Resistance (COIPARS) was established as a pilot project to monitor AMR on poultry farms, slaughter houses and retail markets. © 2015 Blackwell Verlag GmbH.

  3. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  4. Large Pilot-Scale Carbon Dioxide (CO2) Capture Project Using Aminosilicone Solvent.Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hancu, Dan [General Electric Company, Niskayuna, NY (United States)

    2017-12-21

    GE Global Research has developed, over the last 8 years, a platform of cost effective CO2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in previous funded DOE projects (DE-FE0007502 and DEFE0013755), the GAP-1m solvent has increased CO2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. Performance of the GAP-1m solvent was recently demonstrated in a 0.5 MWe pilot at National Carbon Capture Center, AL with real flue gas for over 500 hours of operation using a Steam Stripper Column (SSC). The pilot-scale PSTU engineering data were used to (i) update the techno-economic analysis, and EH&S assessment, (ii) perform technology gap analysis, and (iii) conduct the solvent manufacturability and scale-up study.

  5. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-07-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

  6. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    International Nuclear Information System (INIS)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-01-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL's Program is utilizing nearly all areas in PMI's Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?'' and ''How are you approaching similar challenges?'' will be questions for a dialog with the audience

  7. Permeable reactive barriers for the remediation of groundwater in a mining area: results for a pilot-scale project

    Science.gov (United States)

    Martinez-Sanchez, Maria Jose; Perez-Sirvent, Carmen; Garcia-Lorenzo, Maria Luz; Martinez-Lopez, Salvadora; Perez-Espinosa, Victor; Gonzalez-Ciudad, Eva; Belen Martinez-Martinez, Lucia; Hernandez, Carmen; Molina-Ruiz, Jose

    2017-04-01

    The Sierra Minera of Cartagena-La Union is located in the Region of Murcia, Southeast of Spain. This zone presents high levels of heavy metals due to natural, geogenic reasons. In addition, the prolonged mining activity, and subsequent abandonment of farms, has had consequences on the environment, including severe affectation of the groundwater in the area. To remediate this situation, the Permeable Reactive Barrier (PRB) technology was assayed, which required in addition to the hydro-geological study of the zone, a careful optimization study for the design and construction of PRBs. For such a purpose a pilot-scale project was developed, and this communication reports some of the most relevant findings obtained after a four-years monitorization period. The selected reactive material for the PRBs was limestone filler. The filler is a waste material produced in many factories in the zone. These residues have good adsorption properties, high alkalinity, low cost and high availability, which make them suitable for use in remediation. The PRB was constituted by a 50% limestone filler and 50% sand, a proportion optimized by means of independent batch experiments. A layer of gravel was placed at the top, and on it a layer of natural soil. The barrier was designed in the form of a continuous trench, because the level of the contaminated groundwater was not very deep. In this way, the barrier could be prepared with standard excavation equipment. Parallel to the barrier, 6 wells where arranged downstream for sample collection. The pH and conductivity of the samples was measured directly in situ, and the content of Zn, Cd, Cu, Fe, and Pb were analyzed in the laboratory. All the samples collected after the PRB was constructed had basic pH values between 7.5 and 8. The conductivity was between 5 and 11 mS / cm except for the well 4, which had a value of 3.70 mS / cm. The concentration values of trace elements were below the detection limit (atomic absorption measurement) in

  8. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  9. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  10. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  11. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  12. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  13. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  14. The Pilot Project 'Optical Image Correlation' of the ESA Geohazards Thematic Exploitation Platform (GTEP)

    Science.gov (United States)

    Stumpf, André; Malet, Jean-Philippe

    2016-04-01

    Since more than 20 years, "Earth Observation" (EO) satellites developed or operated by ESA have provided a wealth of data. In the coming years, the Sentinel missions, along with the Copernicus Contributing Missions as well as Earth Explorers and other, Third Party missions will provide routine monitoring of our environment at the global scale, thereby delivering an unprecedented amount of data. While the availability of the growing volume of environmental data from space represents a unique opportunity for science, general R&D, and applications, it also poses major challenges to fully exploit the potential of archived and daily incoming datasets. Those challenges do not only comprise the discovery, access, processing, and visualization of large data volumes but also an increasing diversity of data sources and end users from different fields (e.g. EO, in-situ monitoring, and modeling). In this context, the GTEP (Geohazards Thematic Exploitation Platform) initiative aims to build an operational distributed processing platform to maximize the exploitation of EO data from past and future satellite missions for the detection and monitoring of natural hazards. This presentation focuses on the "Optical Image Correlation" Pilot Project (funded by ESA within the GTEP platform) which objectives are to develop an easy-to-use, flexible and distributed processing chain for: 1) the automated reconstruction of surface Digital Elevation Models from stereo (and tristereo) pairs of Spot 6/7 and Pléiades satellite imagery, 2) the creation of ortho-images (panchromatic and multi-spectral) of Landsat 8, Sentinel-2, Spot 6/7 and Pléiades scenes, 3) the calculation of horizontal (E-N) displacement vectors based on sub-pixel image correlation. The processing chains is being implemented on the GEP cloud-based (Hadoop, MapReduce) environment and designed for analysis of surface displacements at local to regional scale (10-1000 km2) targeting in particular co-seismic displacement and slow

  15. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  16. Selection and Specification of Rear-Projection Screens.

    Science.gov (United States)

    Vlahos, Petro

    1961-01-01

    The characteristics of the rear-projection screen are examined in detail. Numerical constants are provided that define these characteristics for practical screens and convert foot-candles to footlamberts. A procedure is given by which an optimum screen may be specified for a specific application. Contents include--(1) introduction, (2) projection…

  17. 7 CFR 3570.67 - Project selection priorities.

    Science.gov (United States)

    2010-01-01

    ... points; or (4) Between 20,001 and 50,000, inclusive, when applicable—5 points. (b) Income priorities. The median household income of the population to be served by the proposed project is below the higher of the poverty line or: (1) 60 percent of the State nonmetropolitan median household income—30 points; (2) 70...

  18. Joint Applications Pilot of the National Climate Predictions and Projections Platform and the North Central Climate Science Center: Delivering climate projections on regional scales to support adaptation planning

    Science.gov (United States)

    Ray, A. J.; Ojima, D. S.; Morisette, J. T.

    2012-12-01

    The DOI North Central Climate Science Center (NC CSC) and the NOAA/NCAR National Climate Predictions and Projections (NCPP) Platform and have initiated a joint pilot study to collaboratively explore the "best available climate information" to support key land management questions and how to provide this information. NCPP's mission is to support state of the art approaches to develop and deliver comprehensive regional climate information and facilitate its use in decision making and adaptation planning. This presentation will describe the evolving joint pilot as a tangible, real-world demonstration of linkages between climate science, ecosystem science and resource management. Our joint pilot is developing a deliberate, ongoing interaction to prototype how NCPP will work with CSCs to develop and deliver needed climate information products, including translational information to support climate data understanding and use. This pilot also will build capacity in the North Central CSC by working with NCPP to use climate information used as input to ecological modeling. We will discuss lessons to date on developing and delivering needed climate information products based on this strategic partnership. Four projects have been funded to collaborate to incorporate climate information as part of an ecological modeling project, which in turn will address key DOI stakeholder priorities in the region: Riparian Corridors: Projecting climate change effects on cottonwood and willow seed dispersal phenology, flood timing, and seedling recruitment in western riparian forests. Sage Grouse & Habitats: Integrating climate and biological data into land management decision models to assess species and habitat vulnerability Grasslands & Forests: Projecting future effects of land management, natural disturbance, and CO2 on woody encroachment in the Northern Great Plains The value of climate information: Supporting management decisions in the Plains and Prairie Potholes LCC. NCCSC's role in

  19. Recent developments in the Los Alamos National Laboratory Plutonium Facility Waste Tracking System-automated data collection pilot project

    International Nuclear Information System (INIS)

    Martinez, B.; Montoya, A.; Klein, W.

    1999-01-01

    The waste management and environmental compliance group (NMT-7) at the Los Alamos National Laboratory has initiated a pilot project for demonstrating the feasibility and utility of automated data collection as a solution for tracking waste containers at the Los Alamos National Laboratory Plutonium Facility. This project, the Los Alamos Waste Tracking System (LAWTS), tracks waste containers during their lifecycle at the facility. LAWTS is a two-tiered system consisting of a server/workstation database and reporting engine and a hand-held data terminal-based client program for collecting data directly from tracked containers. New containers may be added to the system from either the client unit or from the server database. Once containers are in the system, they can be tracked through one of three primary transactions: Move, Inventory, and Shipment. Because LAWTS is a pilot project, it also serves as a learning experience for all parties involved. This paper will discuss many of the lessons learned in implementing a data collection system in the restricted environment. Specifically, the authors will discuss issues related to working with the PPT 4640 terminal system as the data collection unit. They will discuss problems with form factor (size, usability, etc.) as well as technical problems with wireless radio frequency functions. They will also discuss complications that arose from outdoor use of the terminal (barcode scanning failures, screen readability problems). The paper will conclude with a series of recommendations for proceeding with LAWTS based on experience to date

  20. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  1. Wave Pressures and Loads on a Small Scale Model of the Svåheia SSG Pilot Project

    DEFF Research Database (Denmark)

    Buccino, Mariano; Vicinanza, Diego; Ciardulli, Francesco

    2011-01-01

    The paper reports on 2D small scale experiments conducted to investigate wave loadings acting on a pilot project of device for the conversion of wave energy into electricity. The conversion concept is based on the overtopping principle and the structure is worldwide known with the acronym SSG....... The hydraulic model tests have been carried out at the LInC laboratory of the University of Naples Federico II using random waves. Results indicate wave overtopping is able to cause a sudden inversion of vertical force under wave crest, so that it is alternatively upward and downward directed over a short time...

  2. Use of a virtual world computer environment for international distance education: lessons from a pilot project using Second Life.

    Science.gov (United States)

    Schoonheim, Marloes; Heyden, Robin; Wiecha, John M

    2014-02-21

    Virtual worlds (VWs), in which participants navigate as avatars through three-dimensional, computer-generated, realistic-looking environments, are emerging as important new technologies for distance health education. However, there is relatively little documented experience using VWs for international healthcare training. The Geneva Foundation for Medical Education and Research (GFMER) conducted a VW training for healthcare professionals enrolled in a GFMER training course. This paper describes the development, delivery, and results of a pilot project undertaken to explore the potential of VWs as an environment for distance healthcare education for an international audience that has generally limited access to conventionally delivered education.

  3. A pilot project combining multispectral proximal sensors and digital cameras for monitoring tropical pastures

    Science.gov (United States)

    Handcock, Rebecca N.; Gobbett, D. L.; González, Luciano A.; Bishop-Hurley, Greg J.; McGavin, Sharon L.

    2016-08-01

    Timely and accurate monitoring of pasture biomass and ground cover is necessary in livestock production systems to ensure productive and sustainable management. Interest in the use of proximal sensors for monitoring pasture status in grazing systems has increased, since data can be returned in near real time. Proximal sensors have the potential for deployment on large properties where remote sensing may not be suitable due to issues such as spatial scale or cloud cover. There are unresolved challenges in gathering reliable sensor data and in calibrating raw sensor data to values such as pasture biomass or vegetation ground cover, which allow meaningful interpretation of sensor data by livestock producers. Our goal was to assess whether a combination of proximal sensors could be reliably deployed to monitor tropical pasture status in an operational beef production system, as a precursor to designing a full sensor deployment. We use this pilot project to (1) illustrate practical issues around sensor deployment, (2) develop the methods necessary for the quality control of the sensor data, and (3) assess the strength of the relationships between vegetation indices derived from the proximal sensors and field observations across the wet and dry seasons. Proximal sensors were deployed at two sites in a tropical pasture on a beef production property near Townsville, Australia. Each site was monitored by a Skye SKR-four-band multispectral sensor (every 1 min), a digital camera (every 30 min), and a soil moisture sensor (every 1 min), each of which were operated over 18 months. Raw data from each sensor was processed to calculate multispectral vegetation indices. The data capture from the digital cameras was more reliable than the multispectral sensors, which had up to 67 % of data discarded after data cleaning and quality control for technical issues related to the sensor design, as well as environmental issues such as water incursion and insect infestations. We recommend

  4. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Science.gov (United States)

    2010-04-01

    ... administration of the SSI program. These projects will test the advantages of altering certain requirements... demonstration project will have a termination date (up to 10 years from the start of the project). [48 FR 7576...

  5. Ballroom dancing as physical activity for patients with cancer: a systematic review and report of a pilot project.

    Science.gov (United States)

    Rudolph, Ivonne; Schmidt, Thorsten; Wozniak, Tobias; Kubin, Thomas; Ruetters, Dana; Huebner, Jutta

    2018-04-01

    Physical activity has positive effects on cancer patients. Dancing addresses diverse bio-psycho-social aspects. Our aim was to assess the evidence on ballroom dancing and to develop the setting for a pilot project. We performed a systematic review, extracted the data and designed a pilot training based on standard curricula. We included cancer patients during or after therapy. Training duration was 90 min with one regular pause and individual pauses as needed. We retrieved two systematic reviews and six controlled studies. Types of dancing varied. Only one study used ballroom dancing. Dance training might improve well-being, physical fitness, fatigue and coping during and after therapy. Yet, evidence is scarce and data to derive the effect size are lacking; 27 patients and their partners took part in the pilot training. Patients and partners needed more time to learn the steps than is planned in regular ballroom classes. Participants were very satisfied with the adaptation of the training to their physical strength and estimated the training in a sheltered group. No side effects occurred. In spite of a high rate of participants reporting fatigue, 90 min of physical activity with only a few minutes of rest were manageable for all participants. Ballroom dancing may offer benefits for patients with respect to quality of life. Cancer patients prefer sheltered training setting and curricula of regular ballroom classes must be adapted for cancer patients. Strict curricula might reduce motivation and adherence and exclude patients with lower or variable fitness.

  6. The first results of pilot project on combined preventive suplementation of iodine- and iron deficiency conditions in Tyumen region

    Directory of Open Access Journals (Sweden)

    G V Sharuho

    2010-12-01

    Full Text Available In 2008–2010 pilot project were realized in Tyumen region on combined preventive maintenance iodine deficiency and iron deficiency conditions, within the framework of which children from pilot of the territory got feeding, enriched premixes of the iodine and ferric while checking group has formed the children, getting monoprevention iodized salt. In study were examined 467 children. Frequency of the goiter on ultrasonography in pilot territory fell from 19.8 to 6.4%, in checking from 12.5 to 10.1%. In group teenager on background combined micronutrient preventive maintenance frequency tests ferritin less 15 mcg/l fell for 76 weeks in four times (p = 0.000, herewith average factors in 2010 above, than in 2008 (p = 0.114. In group teenager checking territory on background monoprevention frequency of the lowered tests ferritin more, than in group on background of the combined preventive maintenance in 2 times (p = 0.004, improvements for period of the study is not revealed.Dynamics indices of iodine deficiency conditions on background of the combined preventive maintenance and monoprevention confirms greater efficiency of the simultaneous using the products fortifications iodine and iron. Shown efficiency micronutrient preventive maintenances of the latent deficit ferric fortifications bread.

  7. Quality improvement training for core medical and general practice trainees: a pilot study of project participation, completion and journal publication.

    Science.gov (United States)

    McNab, Duncan; McKay, John; Bowie, Paul

    2015-11-01

    Small-scale quality improvement projects are expected to make a significant contribution towards improving the quality of healthcare. Enabling doctors-in-training to design and lead quality improvement projects is important preparation for independent practice. Participation is mandatory in speciality training curricula. However, provision of training and ongoing support in quality improvement methods and practice is variable. We aimed to design and deliver a quality improvement training package to core medical and general practice specialty trainees and evaluate impact in terms of project participation, completion and publication in a healthcare journal. A quality improvement training package was developed and delivered to core medical trainees and general practice specialty trainees in the west of Scotland encompassing a 1-day workshop and mentoring during completion of a quality improvement project over 3 months. A mixed methods evaluation was undertaken and data collected via questionnaire surveys, knowledge assessment, and formative assessment of project proposals, completed quality improvement projects and publication success. Twenty-three participants attended the training day with 20 submitting a project proposal (87%). Ten completed quality improvement projects (43%), eight were judged as satisfactory (35%), and four were submitted and accepted for journal publication (17%). Knowledge and confidence in aspects of quality improvement improved during the pilot, while early feedback on project proposals was valued (85.7%). This small study reports modest success in training core medical trainees and general practice specialty trainees in quality improvement. Many gained knowledge of, confidence in and experience of quality improvement, while journal publication was shown to be possible. The development of educational resources to aid quality improvement project completion and mentoring support is necessary if expectations for quality improvement are to be

  8. Predictor Development and Pilot Testing of a Prototype Selection Instrument for Army Flight Training

    Science.gov (United States)

    2007-02-01

    called the Automated Pilot Examination System, or "APEX") during the preliminary validation reserach . The current version of the ASTB includes subtests... methodology described in this report will be used to produce a scientifically sound instrument to predict the likelihood that individuals will successfully

  9. Institute for Clinical Evaluative Sciences (ICES Exploratory Data & Analytic Services Private Sector Pilot Project

    Directory of Open Access Journals (Sweden)

    Michael Schull

    2017-04-01

    ICES was able to work with private sector organizations without compromising the three principles. Based on the evaluation of the private sector pilot, and the findings from the focus groups, ICES will begin offering limited analytic services to private sector researchers beginning June 2016 under ICES’ existing corporate structure, and bring recommendations regarding ongoing operations to the ICES Board in June 2017.

  10. A Pilot Project to Increase Parent Comfort Communicating with Their Children about Sexual Health

    Science.gov (United States)

    Barr, Elissa M.; Johnson Moore, Michele; Howard, Alexandria

    2012-01-01

    Risky sexual behaviors among U.S. adolescents have resulted in epidemic rates of sexually transmitted infections, HIV, and unintended pregnancy. This article describes a community-developed pilot program for parents in a large South Florida county aimed at increasing parent comfort in discussing sexuality with their children to improve adolescent…

  11. Multilingual and Multicultural Task-Based Learning Scenarios: A Pilot Study from the MAGICC Project

    Science.gov (United States)

    Álvarez, Inma; Pérez-Cavana, María Luisa

    2015-01-01

    In this article we report on the results of a pilot study on the use of task-based multilingual and multicultural professional scenarios for higher education teachers and learners at BA and MA level. The scenarios reflect new learning outcomes and assessment criteria for the presently under-conceptualised domain of communication in multilingual…

  12. Pilot Water Quality Monitoring Station in Dublin Bay : North Bank Station (NBMS), MATSIS Project Part I

    OpenAIRE

    O'Donnell, Garvan; Joyce, Eileen; Silke, Joe; O'Boyle, Shane; McGovern, Evin

    2008-01-01

    This report describes the pilot development of an autonomous monitoring station in Dublin Bay and validation of the system. It presents results from initial deployments. Sensors were deployed for testing, including an optical sensor for measuring nitrate and sensors for measurement of salinity, temperature, fluorescence and dissolved oxygen. Automated water samplers enabled periodic, remote triggered and event triggered sampling for nutrient and phytoplankton samples.

  13. Children's Views Matter Too! A Pilot Project Assessing Children's and Adolescents' Experiences of Clinical Psychology Services

    Science.gov (United States)

    Gordon, Michael; Russo, Kate

    2009-01-01

    This pilot study explored the experiences and understanding of clinical psychology practices and services of children and adolescents attending clinical psychology outpatient appointments. Fifteen young participants took part in the study. A content analysis indicated that young children and adolescents have an appropriate understanding of the…

  14. 75 FR 9638 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2010-03-03

    ... practice on a case- by-case basis. The FHWA recommends that Caltrans develop a departmentwide, holistic corrective action management approach and system that will develop and implement an internal process review... the Pilot Program. During the on-site audit, Caltrans staff and management continued to express...

  15. Enhancing Social Capital in Children via School-Based Community Cultural Development Projects: A Pilot Study

    Science.gov (United States)

    Buys, Laurie; Miller, Evonne

    2009-01-01

    This exploratory pilot study investigates the extent to which participating in a community cultural development (CCD) initiative builds social capital among children. An independent youth arts organisation implemented two cultural activities, developing a compact disc of original music and designing mosaic artworks for a library courtyard, in two…

  16. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  17. Comparison of midwifery care to medical care in hospitals in the Quebec pilot projects study: clinical indicators. L'Equipe dEvaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Fraser, W; Hatem-Asmar, M; Krauss, I; Maillard, F; Bréart, G; Blais, R

    2000-01-01

    The purpose of this study was to compare indicators of process and outcome of midwifery services provided in the Quebec pilot projects to those associated with standard hospital-based medical services. Women receiving each type of care (961 per group) were matched on the basis of socio-demographic characteristics and level of obstetrical risk. We found midwifery care to be associated with less obstetrical intervention and a reduction in selected indicators of maternal morbidity (caesarean section and severe perineal injury). For neonatal outcome indicators, midwifery care was associated with a mixture of benefits and risks: fewer babies with preterm birth and low birthweight, but a trend toward a higher stillbirth ratio and more frequent requirement for neonatal resuscitation. The study design does not permit to conclude that the associations were causal in nature. However, the high stillbirth rate observed in the group of women who were selected for midwife care raises concerns both regarding the appropriateness of the screening procedures for admission to such care and regarding the quality of care itself.

  18. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  19. Selecting the right collaborative components in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Regardless of context and scope, collaboration is consistently attributed to be an essential determinant of success in construction projects. Researches have long been concerned with the issue of poor collaboration, but situational determination of collaborative components has been overlooked....... The questionnaire was distributed electronically to 440 respondents; after sorting a total of 288 valid responses were obtained. The result is a set of components in a model of structures of collaboration that facilitates a more efficient and effective situational collaboration (EESC), it is denoted as target areas...... structured in type of contract, party and component....

  20. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  1. Air pollution prevention through urban heat island mitigation: An update on the urban heat island pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Gorsevski, V.; Taha, H.; Quattrochi, D.; Luvall, J.

    1998-07-01

    Urban heat islands increase the demand for cooling energy and accelerate the formation of smog. They are created when natural vegetation is replaced by heat-absorbing surfaces such as building roofs and walls, parking lots, and streets. Through the implementation of measures designed to mitigate the urban heat island, communities can decrease their demand for energy and effectively cool the metropolitan landscape. In addition to the economic benefits, using less energy leads to reductions in emission of CO{sub 2}--a greenhouse gas--as well as ozone (smog) precursors such as NOx and VOCs. Because ozone is created when NOx and VOCs photochemically combine with heat and solar radiation, actions taken to lower ambient air temperature can significantly reduce ozone concentrations in certain areas. Measures to reverse the urban heat island include afforestation and the widespread use of highly reflective surfaces. To demonstrate the potential benefits of implementing these measures, EPA has teamed up with NASA and LBNL to initiate a pilot project with three US cities. As part of the pilot, NASA will use remotely-sensed data to quantify surface temperature, albedo, the thermal response number and NDVI vegetation of each city. This information will be used by scientists at Lawrence Berkeley National Laboratory (LBNL) along with other data as inputs to model various scenarios that will help quantify the potential benefits of urban heat island mitigation measures in terms of reduced energy use and pollution. This paper will briefly describe this pilot project and provide an update on the progress to date.

  2. A coordinated school health approach to obesity prevention among Appalachian youth: the Winning with Wellness Pilot Project.

    Science.gov (United States)

    Schetzina, Karen E; Dalton, William T; Lowe, Elizabeth F; Azzazy, Nora; VonWerssowetz, Katrina M; Givens, Connie; Pfortmiller, Deborah T; Stern, H Patrick

    2009-01-01

    Childhood obesity has been an increasing problem in the United States, especially in rural areas. Effective prevention approaches are needed. This article describes the development, implementation, effectiveness, feasibility, and sustainability of a school-based obesity prevention pilot project, Winning with Wellness. The program was based on the coordinated school health model and included a community-based participatory research approach aimed at promoting healthy eating and physical activity in a rural Appalachian elementary school. Findings from this preliminary project revealed improvements in nutrition offerings and increased physical activity during the school day. In addition, the program was found to be acceptable to teachers, successfully implemented utilizing both existing and newly developed resources, and sustainable as evidenced in continued practice and expansion to other area schools.

  3. Understanding of Danish passive houses based on pilot project Comfort Houses

    Energy Technology Data Exchange (ETDEWEB)

    Brunsgaard, C.

    2010-12-15

    The aim of the research is to investigate the notion of passive houses in Denmark. When this PhD thesis was initiated, the Danish building industry has just started to become interested in the passive house concept, but the knowledge was very limited. To be able to speed up the process of constructing Danish passive houses or other low energy concepts Saint-Gobain Isover Scandinavia took the initiative to the pilot project of the Comfort Houses, ten single-family houses constructed as passive houses, and wanted to share the knowledge with the building industry and other interested. This PhD thesis was a part of the strategy. If the concept of passive houses should be successfully promoted and achieve a significant sale in Denmark, it is believed that it is necessary to do a holistic approach. Besides energy savings and new structural solutions more qualitative aspects like architecture, everyday life and the future ways of living needs to be integrated in the future understanding of passive houses. This Ph.D. thesis therefore studies the following research question: What can the experience from the Comfort Houses enlighten about the future production and use of Danish passive houses? This understanding is achieved through studies of different study fields to be able to create a more holistic understanding of the concept both covering qualitative and quantitative analysis. The main focus will be on the study fields Design Process, Architecture and Everyday Life and the Indoor environment, which will answer the following sub-research questions: 1) How has the consortiums behind the Comfort Houses approached the design process according to teamwork, method and tools? And what barriers and possibilities lie within the approaches? 2) How do the occupants of the Comfort Houses experience the passive house architecture and the technical service systems? And has their everyday life changed by moving into a passive house? If so, how? 3) To what extent do the Comfort Houses

  4. Integrating Intimate Partner Violence Screening and Counseling in a Family Planning Clinic: Evaluation of a Pilot Project in Conakry, Guinea.

    Science.gov (United States)

    Samandari, Ghazaleh; Delamou, Alexandre; Traore, Pernamou; Diallo, Fatoumata Guilinty; Millimono, Sita; Camara, Bienvenu Salim; Laffe, Kira; Verani, Fabio; Tolliver, Maimouna

    2016-06-01

    Few programs exist to address Intimate Partner Violence (IPV) in Guinea. In 2014, Engender Health, in partnership with the local health authorities in Conakry, Guinea, piloted an integrated approach to IPV screening and counseling, within an existing family planning clinic. This article describes both the process of formulating and implementing this approach, as well as the results of an evaluation of the program. From January to June of 2014, Engender Health staff trained midwives at the Conakry International Planned Parenthood Federation family planning clinic staff in screening and counseling client for IPV. Program evaluators used project records, interview with program staff (n=3), midwives (n=3) and client exit interviews (n=53) to measure the outcomes of this pilot project. Regardless of their IPV status, clients appreciated having a venue in which to discuss IPV. Program staff also felt empowered by the additional training and support for IPV screening. The evaluation yielded valuable suggestions for improvement, including more time for staff training and mock client interview practice, additional skills in counseling, and stronger referral links for women who screen positive for IPV. Integrating IPV screening into family planning services is an important and feasible method for reaching vulnerable women with IPV services.

  5. Impact of a Student Pharmacist Driven Medication Reconciliation and Antidepressant Treatment History Project at a Depression Clinic: A Pilot Study

    Science.gov (United States)

    Tang, Stella S.; Jaward, Leanna; Ward, Kristen; Parikh, Sagar V.; Bostwick, Jolene R.

    2017-01-01

    Objectives To improve treatment of patients with depression, a new pilot service project involving student pharmacists who would conduct medication reconciliation and review of antidepressant treatment history was created and evaluated. Experimental design A prospective study conducted at the University of Michigan Depression Center. Principal observations From an initial sample of 78 referrals, 41 subjects were reached by phone, with 34 completing medication reconciliation and antidepressant treatment history. Of the 34 patients, 25 (73.5%) had at least one discrepancy identified in their medication list, resulting in 164 medication changes in the electronic medical record (EMR). A total of 105 past antidepressant trials were documented in the 34 individuals, with 34 (32.4%) trials found to be inadequate. Thirteen (38.2%) patients reported failure to respond to two different antidepressants from different classes. All 34 patients participated well in the phone calls and were willing to consult a pharmacist at their upcoming clinic visit. Conclusions A student pharmacist pilot was feasible, identified many discrepancies in the medication record, and identified important medication treatment history in patients with depression in advance of the clinic visit. The project provides support for a specialized role for student pharmacists and demonstrates that interprofessional care can contribute to improved treatment of depression. PMID:28626270

  6. [Postgraduate training for specialists in psychiatry and psychotherapy. Problem-based learning - evaluation of a pilot project].

    Science.gov (United States)

    Rufer, M; Schnyder, U; Schirlo, C; Wengle, H; Gerke, W

    2011-05-01

    Problem-based learning (PBL) emphasizes the student's individual needs, their ability to solve complex clinical problems, and a professional attitude that facilitates communication among colleagues. Thus, PBL appears to provide a perfectly suitable didactic format for postgraduate training of medical specialties. To date, it is only rarely used in this area though. In a pilot project, we implemented PBL into the curriculum of postgraduate training in psychiatry and psychotherapy, and evaluated the program over a period of 12 months, using structured questionnaires. A total of 41 PBL courses were held, with 447 residents participating. Participants as well as tutors assessed 19 of 21 aspects as good or very good (5-point Likert scale, mean value >4). Overall, PBL was rated as highly suitable for advanced training (participants: 4.5±0.8; tutors: 5.0±0.2). The results of this pilot project suggest that PBL might be a useful element of multifaceted advanced training programs, strengthening their practical component and the applicability of knowledge in the daily clinical routine.

  7. Parallel Scaling Characteristics of Selected NERSC User ProjectCodes

    Energy Technology Data Exchange (ETDEWEB)

    Skinner, David; Verdier, Francesca; Anand, Harsh; Carter,Jonathan; Durst, Mark; Gerber, Richard

    2005-03-05

    This report documents parallel scaling characteristics of NERSC user project codes between Fiscal Year 2003 and the first half of Fiscal Year 2004 (Oct 2002-March 2004). The codes analyzed cover 60% of all the CPU hours delivered during that time frame on seaborg, a 6080 CPU IBM SP and the largest parallel computer at NERSC. The scale in terms of concurrency and problem size of the workload is analyzed. Drawing on batch queue logs, performance data and feedback from researchers we detail the motivations, benefits, and challenges of implementing highly parallel scientific codes on current NERSC High Performance Computing systems. An evaluation and outlook of the NERSC workload for Allocation Year 2005 is presented.

  8. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  9. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  10. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  11. Development and piloting of the Fiji Injury Surveillance in Hospitals System (TRIP Project-1).

    Science.gov (United States)

    Wainiqolo, I; Kafoa, B; McCaig, E; Kool, B; McIntyre, R; Ameratunga, S

    2013-01-01

    Whilst more than 90% of injury related deaths are estimated to occur in low-and-middle-income countries (LMICs), the epidemiology of fatal and hospitalised injuries in Pacific Island Countries has received scant attention. This study describes the development and piloting of a population-based trauma registry in Fiji to address this gap in knowledge. The Fiji Injury Surveillance in Hospitals (FISH) system was an active surveillance system designed to identify injuries resulting in death or a hospital admission in Viti Levu, Fiji. During the pilot conducted over five months in 2005, Accident and Emergency registers, admission folders and morgue registers from 8 of Viti Levu's 12 hospitals, and an additional 3 hospitals in other parts of the country were reviewed by hospital staff and medical students to identify cases and extract a minimum data set that included demographic factors; the mechanism, nature and context of injury; substance use; and discharge outcomes. The system was audited to identify and redress difficulties with data quality in a manner that also supported local capacity development and training in injury surveillance and data management. This pilot study demonstrated the potential to collect high quality data on injuries that can pose a significant threat to life in Fiji using a mechanism that also increased the capability of health professionals to recognise the significance of injury as a public health issue. The injury surveillance system piloted provides the opportunity to inform national injury control strategies in Fiji and increase the capacity for injury prevention and more focused research addressing risk factors in the local context. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. Higher education for refugees: Lessons from a 4-year pilot project

    Science.gov (United States)

    Crea, Thomas M.; McFarland, Mary

    2015-04-01

    Refugees experience limited access to adequate education at all levels, but opportunities for higher education are especially lacking. Yet, evidence suggests that education plays an important protective role in helping refugee individuals and communities cope with their daily existence during protracted waiting periods, and the United Nations refugee agency (UNHCR) recently recognised tertiary education as a basic human right. The purpose of this paper is to present findings from the evaluation of a pilot programme, Jesuit Commons: Higher Education at the Margins (JC:HEM), which initially provided higher education to refugees in Kakuma Camp, Kenya and Dzaleka Camp, Malawi; and to urban refugees in Amman, Jordan. The authors of this note review the progress made towards the pilot objectives, as well as student feedback on the benefits and challenges of higher education for refugees and others living at the margins. The refugees interviewed in this study expressed feelings of empowerment, related to their expanded worldview as well as to a specific set of skills obtained through their participation in the programme. Interviewees also noted a number of limitations specific to the context of their living conditions. Particularly in refugee camps, students expressed concerns about what would happen after their having completed their course. The general outcome of the pilot phase, which ended in 2014, was that the programme addresses a critical need and that it should be continued, albeit with key modifications in its design and delivery. Key areas for future growth of the programme include curriculum transformation, integrated service delivery and university engagement.

  13. Increasing the occupational therapy mental health workforce through innovative practice education: a pilot project.

    Science.gov (United States)

    Rodger, Sylvia; Thomas, Yvonne; Holley, Sue; Springfield, Elizabeth; Edwards, Ann; Broadbridge, Jacqui; Greber, Craig; McBryde, Cathy; Banks, Rebecca; Hawkins, Rachel

    2009-12-01

    This paper describes the evaluation of a pilot trial of two innovative placement models in the area of mental health, namely role emerging and collaborative supervision. The Queensland Occupational Therapy Fieldwork Collaborative conducted this trial in response to workforce shortages in mental health. Six occupational therapy students and eight practice educators were surveyed pre- and post-placements regarding implementation of these innovative models. Students participating in these placements reported that they were highly likely to work in mental health upon graduation, and practice educators were positive about undertaking innovative placements in future. An overview of the placement sites, trials, outcomes and limitations of this pilot trial is provided. Though limited by its small sample size, this pilot trial has demonstrated the potential of innovative placement models to provide valuable student learning experiences in mental health. The profession needs to develop expertise in the use of innovative placement models if students are to be adequately prepared to work with the mental health issues of the Australian community now and in the future.

  14. Development of CO2 Selective Poly(Ethylene Oxide-Based Membranes: From Laboratory to Pilot Plant Scale

    Directory of Open Access Journals (Sweden)

    Torsten Brinkmann

    2017-08-01

    Full Text Available Membrane gas separation is one of the most promising technologies for the separation of carbon dioxide (CO2 from various gas streams. One application of this technology is the treatment of flue gases from combustion processes for the purpose of carbon capture and storage. For this application, poly(ethylene oxide-containing block copolymers such as Pebax® or PolyActive™ polymer are well suited. The thin-film composite membrane that is considered in this overview employs PolyActive™ polymer as a selective layer material. The membrane shows excellent CO2 permeances of up to 4 m3(STP·(m2·h·bar−1 (1 bar = 105 Pa at a carbon dioxide/nitrogen (CO2/N2 selectivity exceeding 55 at ambient temperature. The membrane can be manufactured reproducibly on a pilot scale and mounted into flat-sheet membrane modules of different designs. The operating performance of these modules can be accurately predicted by specifically developed simulation tools, which employ single-gas permeation data as the only experimental input. The performance of membranes and modules was investigated in different pilot plant studies, in which flue gas and biogas were used as the feed gas streams. The investigated processes showed a stable separation performance, indicating the applicability of PolyActive™ polymer as a membrane material for industrial-scale gas processing.

  15. Pilot's Automated Weather Support System (PAWSS) concepts demonstration project. Phase 1: Pilot's weather information requirements and implications for weather data systems design

    Science.gov (United States)

    Crabill, Norman L.; Dash, Ernie R.

    1991-01-01

    The weather information requirements for pilots and the deficiencies of the current aviation weather support system in meeting these requirements are defined. As the amount of data available to pilots increases significantly in the near future, expert system technology will be needed to assist pilots in assimilating that information. Some other desirable characteristics of an automation-assisted system for weather data acquisition, dissemination, and assimilation are also described.

  16. Human Error Analysis Project (HEAP) - The Fourth Pilot Study: Scoring and Analysis of Raw Data Types

    International Nuclear Information System (INIS)

    Hollnagel, Erik; Braarud; Per Oeyvind; Droeivoldsmo, Asgeir; Follesoe; Knut; Helgar, Stein; Kaarstad, Magnhild

    1996-01-01

    Pilot study No. 4 rounded off the series of pilot studies by looking at the important issue of the quality of the various data sources. The preceding experiments had clearly shown that that it was necessary to use both concurrent and interrupted verbal protocols, and also that information about eye movements was very valuable. The effort and resources needed to analyse a combination of the different data sources is, however, significant, and it was therefore important to find out whether one or more of the data sources could replace another. In order to determine this issue, pilot study No. 4 looked specifically at the quality of information provided by different data sources. The main hypotheses were that information about operators' diagnosis and decision making would be provided by verbal protocols, expert commentators, and auto-confrontation protocols, that the data sources would be valid, and that they would complement each other. The study used three main data sources: (1) concurrent verbal protocols, which were the operators' verbalisations during the experiment; (2) expert commentator reports, which were descriptions by process experts of the operators' performance; and (3) auto-confrontation, which were the operators' comments on their performance based on a replay of the performance recording minus the concurrent verbal protocol. Additional data sources were eye movement recordings, process data, alarms, etc. The three main data sources were treated as independent variables and applied according to an experimental design that facilitated the test of the main hypotheses. The pilot study produced altogether 59 verbal protocols, some of which were in Finnish. After a translation into English, each protocol was analysed and scored according to a specific scheme. The scoring was designed to facilitate the evaluation of the experimental hypotheses. Due to the considerable work involved, the analysis process has only been partly completed, and no firm results

  17. Electronic medical file exchange between on-duty care providers and the attending paediatrician: a Belgian paediatric pilot project.

    Science.gov (United States)

    Deneyer, M; Hachimi-Idrissi, S; Michel, L; Nyssen, M; De Moor, G; Vandenplas, Y

    2012-01-01

    The authors propose the introduction of a pilot project: "paediatric core file exchange in emergencies" (PCF-EXEM) which enables the exchange of medical data between the attending paediatrician (AP), holder of the medical record, and on-duty medical units (i.e. general practitioners, paediatricians, surgeons, emergency physicians,...). This project is based on two pillars: a protected server (PCF-server) containing paediatric core files (PCF), with important clinical data that should be available for the physician in order to quickly get a clear insight into the relevant clinical medical history of the child, and secondly, the possibility to provide feedback to the attending physician about the findings recorded during the on-call duty. The permanent availability of health data on the PCF-server and the possibility to provide feedback represent together the PCF-EXEM-project. This project meets the demand of the care providers to have relevant medical information permanently available in order to guarantee high quality care in emergency situations. The frail balance between the right to informative privacy and professional confidentiality on the one hand and the right to quality health care on the other hand has been taken into account. The technical and practical feasibility of this project is described. The objectives and vision of the PCF-EXEM project are conform to Belgian legislation concerning the processing of medical data and are in line with the still under consideration European projects which are focusing on interoperability and the development of a common access control to databanks containing health data for care providers. PCF-EXEM could therefore be a model for other EU countries as well.

  18. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  19. Engaging the broader community in biodiversity research: the concept of the COMBER pilot project for divers in ViBRANT

    Directory of Open Access Journals (Sweden)

    Christos Arvanitidis

    2011-11-01

    Full Text Available This paper discusses the design and implementation of a citizen science pilot project, COMBER (Citizens’ Network for the Observation of Marine BiodivERsity, http://www.comber.hcmr.gr, which has been initiated under the ViBRANT EU e-infrastructure. It is designed and implemented for divers and snorkelers who are interested in participating in marine biodiversity citizen science projects. It shows the necessity of engaging the broader community in the marine biodiversity monitoring and research projects, networks and initiatives. It analyses the stakeholders, the industry and the relevant markets involved in diving activities and their potential to sustain these activities. The principles, including data policy and rewards for the participating divers through their own data, upon which this project is based are thoroughly discussed. The results of the users analysis and lessons learned so far are presented. Future plans include promotion, links with citizen science web developments, data publishing tools, and development of new scientific hypotheses to be tested by the data collected so far.

  20. Italian network for obesity and cardiovascular disease surveillance: a pilot project.

    Science.gov (United States)

    Donfrancesco, Chiara; Lo Noce, Cinzia; Brignoli, Ovidio; Riccardi, Gabriele; Ciccarelli, Paola; Dima, Francesco; Palmieri, Luigi; Giampaoli, Simona

    2008-09-29

    Also in Mediterranean countries, which are considered a low risk population for cardiovascular disease (CVD), the increase in body mass index (BMI) has become a public health priority. To evaluate the feasibility of a CVD and obesity surveillance network, forty General Practitioners (GPs) were engaged to perform a screening to assess obesity, cardiovascular risk, lifestyle habits and medication use. A total of 1,046 women and 1,044 men aged 35-74 years were randomly selected from GPs' lists stratifying by age decade and gender. Anthropometric and blood pressure measurements were performed by GPs using standardized methodologies. BMI was computed and categorized in normal weight (BMI 18.5-24.9 kg/m2), overweight (BMI 25.0-29.9 kg/m2) and obese (BMI > or = 30 kg/m2). Food frequency (per day: fruits and vegetables; per week: meat, cheese, fish, pulses, chocolate, fried food, sweet, wholemeal food, rotisserie food and sugar drink) and physical activity (at work and during leisure time) were investigated through a questionnaire. CVD risk was assessed using the Italian CUORE Project risk function. The percentage of missing values was very low. Prevalence of overweight was 34% in women and 50% in men; prevalence of obesity was 23% in both men and women. Level of physical activity was mostly low or very low. BMI was inversely associated with consumption of pulses, rotisserie food, chocolate, sweets and physical activity during leisure time and directly associated with consumption of meat. Mean value of total cardiovascular risk was 4% in women and 11% in men. One percent of women and 16% of men were at high cardiovascular risk (> or = 20% in 10 years). Normal weight persons were four times more likely to be at low risk than obese persons. This study demonstrated the feasibility of a surveillance network of GPs in Italy focusing on obesity and other CVD risk factors. It also provided information on lifestyle habits, such as diet and physical activity.

  1. Identifying Best Bet Entry-Level Selection Measures for US Air Force Remotely Piloted Aircraft (RPA) Pilot and Sensor Operator (SO) Occupations

    Science.gov (United States)

    2011-12-01

    occupations (pilots, combat system operators, air battle managers) (Carretta, 2008; Carretta & Ree, 2003; Olea & Ree, 1994). This body of knowledge...Ergonomics, 50(7), 1064-1091. O’Hare, D. (1997). Cognitive ability determinants of elite pilot performance. Human Factors, 39, 540-552. Olea

  2. Two related narratives: learning from an evaluation of a short coaching workshop and a pilot coaching project

    Directory of Open Access Journals (Sweden)

    Keith Jones

    2015-11-01

    Full Text Available Background and context: A key role of the district’s Nursing Midwifery Practice and Workforce Unit is to build capability in the nursing and midwifery workforce. In this paper I reflect on the experience of my team following attendance at a two-day Coaching for Performance workshop and the impact this had on developing coaching skills for nurse managers and nurse unit managers in South Eastern Sydney Local Health District. Aims: To highlight how engaging in critical reflection enabled the unit team to identify gaps in the transfer of coaching skills learned from the two-day workshop to everyday management practices. The pilot project to embed coaching into management practices is the result of the team’s reflection. The method, findings and implications for coaching practices for nurse managers and nurse unit managers are described in detail. Findings: Using Gibbs’ model of reflection, the unit team reflected on its collective experiences following attendance at the workshop. This led to the development of a pilot coaching project called Embedding Coaching into Practice for nurse managers and nurse unit managers, which enabled the transfer of coaching skills learned to everyday management practices. The pilot project used a ‘coaching the coach’ approach, with structured follow-up at the managers’ places of work. This had a positive impact on the development of coaching skills and managers were able to use these skills with confidence to enable their staff to develop problem-solving skills. Conclusions: This paper highlights how using a validated tool for reflection can lead to positive change. ‘Coaching the coach’ can support transfer of coaching skills learned into everyday practices, which has a positive impact on work performance for nurse managers, nurse unit managers and their staff. It supports the practice development principle that lifelong learning can influence effective workplace cultures and have a positive impact on

  3. Pilot production system cost/benefit analysis: Digital document storage project

    Science.gov (United States)

    1989-01-01

    The Digital Document Storage (DDS)/Pilot Production System (PPS) will provide cost effective electronic document storage, retrieval, hard copy reproduction, and remote access for users of NASA Technical Reports. The DDS/PPS will result in major benefits, such as improved document reproduction quality within a shorter time frame than is currently possible. In addition, the DDS/PPS will provide an important strategic value through the construction of a digital document archive. It is highly recommended that NASA proceed with the DDS Prototype System and a rapid prototyping development methodology in order to validate recent working assumptions upon which the success of the DDS/PPS is dependent.

  4. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  5. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  6. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  7. Business and Industry Project-Based Capstone Courses: Selecting Projects and Assessing Learning Outcomes

    Science.gov (United States)

    Maleki, Reza A.

    2009-01-01

    This is the first of two articles in which the author shares experiences gained from the development and delivery of a business/industry project-based capstone course. The course integrates research, proposal development and design experience based on knowledge and skills acquired in earlier coursework. The course also incorporates standards and…

  8. ExoHab Pilot Project & Field Tests for Moon-Mars Human Laboratories

    Science.gov (United States)

    Foing, Bernard

    2010-05-01

    We studied concepts for a minimal Moon-Mars habitat, in focussing on the system aspects and coordinating every different part as part an evolving architecture. We validated experimentally the Habitat and Laboratory ExoHab concept constraints during EuroGeoMars campaign in Utah desert research station (from 24 Jan. to 28 Feb. 2009) and EuroMoonMars/DOMMEX campaigns in Nov 2009 and February-April 2010. We discuss from the ILEWG ExoHab concept studies and field simulations the specifics of human exploration, with focus on habitability and human performance. In the ExoHab pilot concept project (supported by ILEWG, ESA NASA), we justify the case for a scientific and exploration outpost allowing experiments, sample analysis in laboratory (relevant to the origin and evolution of planets and life, geophysical and geo-chemical studies, astrobiology and life sciences, observation sciences, technology demonstration, resource utilisation, human exploration and settlement). In this modular concept, we consider various infra structure elements: core habitat, Extra Vehicular activity (EVA), crew mobility, energy supply, recycling module, communication, green house and food production, operations. We review some studies space agencies' architecture proposals, with landers, orbiters, rovers, habitats, surface operations and protocols. We focus on the easiest and the soonest way in settling a minimal base immediately operational in scientific experimentation and exploration, but not immediately autonomous. Through a modular concept, this outpost will be possibly evolved into a long duration or permanent base. We will analyse the possibilities of settling such a minimal base by means of the current and near term propulsion technology, as a full Ariane 5 ME carrying 1.7 T of gross payload to the surface of the Moon (Integrated Exploration Study, ESA ESTEC [1,2]). The low solar rays incidence may permit having ice in deep craters, which will be beneficial for the evolution of the

  9. Pilot project of biogas production from pig manure and urine mixture at ambient temperature in Ventanilla (Lima, Peru)

    International Nuclear Information System (INIS)

    Ferrer, I.; Gamiz, M.; Almeida, M.; Ruiz, A.

    2009-01-01

    Parque Porcino de Ventanilla has an extension of 840 ha with 2200 farmers dedicated to pig production. There is a lack of services in the area (i.e., water supply, electricity, or waste collection). Anaerobic treatment of pig manure would replace current dumping and incineration, reducing environmental pollution and hazards to public health, as well as providing an organic fertilizer and biogas. The objective of the present work was to study the viability of ambient temperature anaerobic digestion of pig manure diluted in urine, by means of on-site pilot scale reactors. The final goal was to establish design parameters for anaerobic digesters to be implemented; since it was part of a project to improve life conditions for the farmers through the incorporation of better management techniques. Experiments were carried out in a low-cost pilot plant, which consists of three anaerobic digesters (225 L total volume), without heating or agitation, placed in a greenhouse. The start-up of the digestion process was performed with a mixture of temperature adapted pig manure-sludge and fresh rumen, and showed a good performance regardless of the dilution of pig manure with water or urine, which is a key parameter due to the scarcity of water in the area under study

  10. Pilot project of biogas production from pig manure and urine mixture at ambient temperature in Ventanilla (Lima, Peru).

    Science.gov (United States)

    Ferrer, I; Gamiz, M; Almeida, M; Ruiz, A

    2009-01-01

    Parque Porcino de Ventanilla has an extension of 840ha with 2200 farmers dedicated to pig production. There is a lack of services in the area (i.e., water supply, electricity, or waste collection). Anaerobic treatment of pig manure would replace current dumping and incineration, reducing environmental pollution and hazards to public health, as well as providing an organic fertilizer and biogas. The objective of the present work was to study the viability of ambient temperature anaerobic digestion of pig manure diluted in urine, by means of on-site pilot scale reactors. The final goal was to establish design parameters for anaerobic digesters to be implemented; since it was part of a project to improve life conditions for the farmers through the incorporation of better management techniques. Experiments were carried out in a low-cost pilot plant, which consists of three anaerobic digesters (225L total volume), without heating or agitation, placed in a greenhouse. The start-up of the digestion process was performed with a mixture of temperature adapted pig manure-sludge and fresh rumen, and showed a good performance regardless of the dilution of pig manure with water or urine, which is a key parameter due to the scarcity of water in the area under study.

  11. A competency based selection procedure for Dutch postgraduate GP training: a pilot study on validity and reliability.

    Science.gov (United States)

    Vermeulen, Margit I; Tromp, Fred; Zuithoff, Nicolaas P A; Pieters, Ron H M; Damoiseaux, Roger A M J; Kuyvenhoven, Marijke M

    2014-12-01

    Abstract Background: Historically, semi-structured interviews (SSI) have been the core of the Dutch selection for postgraduate general practice (GP) training. This paper describes a pilot study on a newly designed competency-based selection procedure that assesses whether candidates have the competencies that are required to complete GP training. The objective was to explore reliability and validity aspects of the instruments developed. The new selection procedure comprising the National GP Knowledge Test (LHK), a situational judgement tests (SJT), a patterned behaviour descriptive interview (PBDI) and a simulated encounter (SIM) was piloted alongside the current procedure. Forty-seven candidates volunteered in both procedures. Admission decision was based on the results of the current procedure. Study participants did hardly differ from the other candidates. The mean scores of the candidates on the LHK and SJT were 21.9 % (SD 8.7) and 83.8% (SD 3.1), respectively. The mean self-reported competency scores (PBDI) were higher than the observed competencies (SIM): 3.7(SD 0.5) and 2.9(SD 0.6), respectively. Content-related competencies showed low correlations with one another when measured with different instruments, whereas more diverse competencies measured by a single instrument showed strong to moderate correlations. Moreover, a moderate correlation between LHK and SJT was found. The internal consistencies (intraclass correlation, ICC) of LHK and SJT were poor while the ICC of PBDI and SIM showed acceptable levels of reliability. Findings on content validity and reliability of these new instruments are promising to realize a competency based procedure. Further development of the instruments and research on predictive validity should be pursued.

  12. Project baselines and boundaries for project-based GHG emission reduction trading : a report to the Greenhouse Gas Emission Trading Pilot Program

    Energy Technology Data Exchange (ETDEWEB)

    Lazarus, M.; Kartha, S.; Bernow, S. [Tellus Inst., Boston, MA (United States)

    2001-04-01

    One of the great challenges for policy makers in the twenty first century is turning out to be global climate change caused by greenhouse gas emissions. Recent setbacks in international negotiations do not preclude the imposition of national emission targets. One option being studied to increase the economic efficiency of meeting these targets is the creation of emissions trading markets. The exploration of credit trading in the field of greenhouse gas emissions is carried out under the banner of the Greenhouse Gas Emission Reduction Trading (GERT) Pilot Project. One of its objectives is the development of the institutional framework required for the Clean Development Mechanism (CDM), Joint Implementation (JI), and other international credit trading programs. To ensure credits are awarded to projects in a fair and transparent manner, technical, methodological, and administrative processes must be put in place. The determination of project baselines and project boundaries represent two of the main challenges confronting policy makers in awarding the credits. A review of baseline and boundary methods was initiated by GERT, and this report also contains a description of the main advantages and drawbacks of the various methods being considered. Lessons learned and opportunities are especially important for GERT to provide proper guidance to developers. The context and rationale for baselines and boundary setting are first explored in this report, as well as the issues of importance, and common criteria for the evaluation of alternative methods. The principal options for baseline determination, advantages and disadvantages, and applicability in various contexts were reviewed in section 2. The topic of avoided electricity use, and how to set consistent baselines for it are discussed in section 3. Project boundary is the topic of section 4, including leakage, upstream and downstream emissions, rebound and positive spillover effects, and means by which these issues can de

  13. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  14. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  15. The State of Hawaii Department of Education Job Sharing Pilot Project.

    Science.gov (United States)

    Hawaii State Dept. of Education, Honolulu.

    Intended to test the feasibility of job-sharing in Hawaii's schools, this project was set up to provide job sharing of one hundred teaching positions on a fifty-fifty basis between experienced tenured teachers and new hires. The report describes the purpose and intent of the project; defines job sharing; establishes tentative guidelines for…

  16. Pathway to Graduation: A Pilot Reading Project for Middle School Students during the Summer Months

    Science.gov (United States)

    Hilsmier, Amanda Strong; Wood, Patricia F.; Wirt, Susan; McTamney, Diane; Malone, Mary Beth; Milstead, Becky

    2014-01-01

    The purpose of this article is to outline the implementation of a summer reading project targeted at middle school students with identified reading deficits and behavioral concerns called Pathway to Graduation (PTG). The project was a collaborative process between a school district, local university, and department of mental health. The students…

  17. Exploring Students' Computational Thinking Skills in Modeling and Simulation Projects: : A Pilot Study

    NARCIS (Netherlands)

    Grgurina, Natasa; van Veen, Klaas; Barendsen, Erik; Zwaneveld, Bert; Suhre, Cor; Gal-Ezer, Judith; Sentance, Sue; Vahrenhold, Jan

    2015-01-01

    Computational Thinking (CT) is gaining a lot of attention in education. We explored how to discern the occurrences of CT in the projects of 12th grade high school students in the computer science (CS) course. Within the projects, they constructed models and ran simulations of phenomena from other

  18. Wastewater planning in Djenné, Mali. A pilot project for the local infiltration of domestic wastewater.

    Science.gov (United States)

    Alderlieste, M C; Langeveld, J G

    2005-01-01

    The city of Djenné (Mali) is famous for its mosque which is the world's largest adobe building. Djenné is considered to be one of the most interesting cities in Western Africa from an architectural point of view. Since 1988, Djenné is listed as a UNESCO World Heritage Site. In the 1990s, a drinking water supply network was provided by foreign development organisations. However, no facilities were provided for the disposal of wastewater, resulting in an increase of waterborne diseases. This paper describes the urban drainage problem in Djenné and discusses the systematic evaluation of possible solutions and the subsequent pilot project for the local infiltration of sullage. The infiltration of sullage proved to be an appropriate technology for solving the urban drainage problem in Djenné.

  19. A pilot study for the analysis of dream reports using Maslow's need categories: an extension to the emotional selection hypothesis.

    Science.gov (United States)

    Coutts, Richard

    2010-10-01

    The emotional selection hypothesis describes a cyclical process that uses dreams to modify and test select mental schemas. An extension is proposed that further characterizes these schemas as facilitators of human need satisfaction. A pilot study was conducted in which this hypothesis was tested by assigning 100 dream reports (10 randomly selected from 10 dream logs at an online web site) to one or more categories within Maslow's hierarchy of needs. A "match" was declared when at least two of three judges agreed both for category and for whether the identified need was satisfied or thwarted in the dream narrative. The interjudge reliability of the judged needs was good (92% of the reports contained at least one match). The number of needs judged as thwarted did not differ significantly from the number judged as satisfied (48 vs. 52%, respectively). The six "higher" needs (belongingness, esteem, cognitive, aesthetic, self-actualization, and transcendence) were scored significantly more frequently (81%) than were the two lowest or "basic" needs (physiological and safety, 19%). Basic needs were also more likely to be judged as thwarted, while higher needs were more likely to be judged as satisfied. These findings are discussed in the context of Maslow's hierarchy of needs as a framework for investigating theories of dream function, including the emotional selection hypothesis and other contemporary dream theories.

  20. Italian network for obesity and cardiovascular disease surveillance: A pilot project

    Directory of Open Access Journals (Sweden)

    Palmieri Luigi

    2008-09-01

    Full Text Available Abstract Background Also in Mediterranean countries, which are considered a low risk population for cardiovascular disease (CVD, the increase in body mass index (BMI has become a public health priority. To evaluate the feasibility of a CVD and obesity surveillance network, forty General Practitioners (GPs were engaged to perform a screening to assess obesity, cardiovascular risk, lifestyle habits and medication use. Methods A total of 1,046 women and 1,044 men aged 35–74 years were randomly selected from GPs' lists stratifying by age decade and gender. Anthropometric and blood pressure measurements were performed by GPs using standardized methodologies. BMI was computed and categorized in normal weight (BMI 18.5–24.9 kg/m2, overweight (BMI 25.0–29.9 kg/m2 and obese (BMI ≥ 30 kg/m2. Food frequency (per day: fruits and vegetables; per week: meat, cheese, fish, pulses, chocolate, fried food, sweet, wholemeal food, rotisserie food and sugar drink and physical activity (at work and during leisure time were investigated through a questionnaire. CVD risk was assessed using the Italian CUORE Project risk function. Results The percentage of missing values was very low. Prevalence of overweight was 34% in women and 50% in men; prevalence of obesity was 23% in both men and women. Level of physical activity was mostly low or very low. BMI was inversely associated with consumption of pulses, rotisserie food, chocolate, sweets and physical activity during leisure time and directly associated with consumption of meat. Mean value of total cardiovascular risk was 4% in women and 11% in men. One percent of women and 16% of men were at high cardiovascular risk (≥ 20% in 10 years. Normal weight persons were four times more likely to be at low risk than obese persons. Conclusion This study demonstrated the feasibility of a surveillance network of GPs in Italy focusing on obesity and other CVD risk factors. It also provided information on lifestyle habits

  1. Assessment of the Lillgrund Windfarm, Power Performance and Wake Effects. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Dahlberg, Jan-Aake (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-06-15

    In this report, an assessment of the power performance of individual turbines, as well as for the whole wind farm, Lillgrund, is presented. By using the nearby meteorological mast, a power performance assessment, in line with international standards, has been carried out for three turbines located close to the met mast, as well as for the whole farm. The derived power curves for the single turbines are almost identical, and slightly better than, the power curves given in WindPro. The assessment of the power performance of the whole wind farm resulted in an average power curve that is significantly lower than the power curve for an undisturbed turbine. The overall energy efficiency of the farm, calculated from the measured wind farm power curve and assuming a Rayleigh distributed wind speed with an annual average value of 8.0 m/s, gives an efficiency value of about 77%. The losses are relatively high, which is not surprising, for such a dense wind farm configuration. The Lillgrund wind farm is considered to have a very dense configuration and it is, therefore, of great interest to investigate how shading effects (wake effects) will influence the production. The main objective of the project has been to analyze the power output of the whole wind farm for different wind directions and wind speeds and thus identify and quantify the wake effects. Shading effects are defined as the power ratio between the power output of one or more selected object turbines and the power levels of one or more reference turbines, located up front. Shading effects have been identified for a number of cases and can be clearly demonstrated. Significant wake effects occur when the wind is blowing along a row of turbines. The maximum peak loss occurs for the second turbine in the row and is, for inter row spacing of 4.4xD, typically 70%, and for row spacing of 3.3xD, typically 80%. One assumption that has been adopted is that power reduction only occurs for production below rated wind speeds

  2. Pilot project at Hazira, India, for capture of carbon dioxide and its biofixation using microalgae.

    Science.gov (United States)

    Yadav, Anant; Choudhary, Piyush; Atri, Neelam; Teir, Sebastian; Mutnuri, Srikanth

    2016-11-01

    The objective of the present study was to set up a small-scale pilot reactor at ONGC Hazira, Surat, for capturing CO 2 from vent gas. The studies were carried out for CO 2 capture by either using microalgae Chlorella sp. or a consortium of microalgae (Scenedesmus quadricauda, Chlorella vulgaris and Chlorococcum humicola). The biomass harvested was used for anaerobic digestion to produce biogas. The carbonation column was able to decrease the average 34 vol.% of CO 2 in vent gas to 15 vol.% of CO 2 in the outlet gas of the carbonation column. The yield of Chlorella sp. was found to be 18 g/m 2 /day. The methane yield was 386 l CH 4 /kg VS fed of Chlorella sp. whereas 228 l CH 4 /kg VS fed of the consortium of algae.

  3. Reference stratigraphy and rock properties for the Waste Isolation Pilot Plant (WIPP) project

    International Nuclear Information System (INIS)

    Krieg, R.D.

    1984-01-01

    A stratigraphic description of the country rock near the working horizon at the Waste Isolation Pilot Plant (WIPP) is presented along with a set of mechanical and thermal properties of materials involved. Data from 41 cores and shafts are examined. The entire stratigraphic section is found to vary in elevation in a regular manner, but individual layer thicknesses and relative separation between layers are found to have no statistically significant variation over the one mile north to south extent of the working horizon. The stratigraphic description is taken to be relative to the local elevation of Anhydrite b. The material properties have been updated slightly from those in the July 1981 Reference Stratigraphy. This reference stratigraphy/properties document is intended primarily for use in thermal/structural analyses. This document supercedes the July 1981 stratigraphy/properties document. 31 references, 7 figures

  4. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  5. Teaching Climate Change Using System Models: An Understanding Global Change Project Pilot Study

    Science.gov (United States)

    Bean, J. R.; Stuhlsatz, M.; Bracey, Z. B.; Marshall, C. R.

    2017-12-01

    Teaching and learning about historical and anthropogenic climate change in the classroom requires integrating instructional resources that address physical, chemical, and biological processes. The Understanding Global Change (UGC) framework and system models developed at the University of California Museum of Paleontology (UCMP) provide visualizations of the relationships and feedbacks between Earth system processes, and the consequences of anthropogenic activities on global climate. This schema provides a mechanism for developing pedagogic narratives that are known to support comprehension and retention of information and relationships. We designed a nine-day instructional unit for middle and high school students that includes a sequence of hands-on, inquiry-based, data rich activities combined with conceptual modeling exercises intended to foster students' development of systems thinking and their understanding of human influences on Earth system processes. The pilot unit, Sea Level Rise in the San Francisco Bay Area, addresses the human causes and consequences of sea level rise and related Earth system processes (i.e., the water cycle and greenhouse effect). Most of the content is not Bay Area specific, and could be used to explore sea level rise in any coastal region. Students completed pre and post assessments, which included questions about the connectedness of components of the Earth system and probed their attitudes towards participating in environmental stewardship activities. Students sequentially drew models representing the content explored in the activities and wrote short descriptions of their system diagrams that were collected by teachers for analysis. We also randomly assigned classes to engage in a very short additional intervention that asked students to think about the role that humans play in the Earth system and to draw themselves into the models. The study will determine if these students have higher stewardship scores and more frequently

  6. EPA’s Summary Report of the Collaborative Green Infrastructure Pilot Project for the Middle Blue River in Kansas City, MO

    Science.gov (United States)

    The United States Environmental Protection Agency evaluated the performance of a hybrid green-gray infrastructure pilot project installed into the Marlborough Neighborhood by the Kansas City Water Services Department. Kansas City installed 135 vegetated SCMs, 24,290 square feet o...

  7. Evaluation of the School Breakfast Program Pilot Project: Final Report. Special Nutrition Programs. Report Number CN-04-SBP. Nutrition Assistance Program Report Series

    Science.gov (United States)

    Bernstein, Lawrence S.; McLaughlin, Joan E.; Crepinsek, Mary Kay; Daft, Lynn M.

    2004-01-01

    In 1998, Congress authorized the School Breakfast Program Pilot Project (SBPP) to study the implementation and effects of providing universal free school breakfast in six school districts across the United States. For three years, from School Year (SY) 2000-2001 through SY 2002-2003, these six school districts received federal funds to offer…

  8. A Pilot for Improving Depression Care on College Campuses: Results of the College Breakthrough Series-Depression (CBS-D) Project

    Science.gov (United States)

    Chung, Henry; Klein, Michael C.; Silverman, Daniel; Corson-Rikert, Janet; Davidson, Eleanor; Ellis, Patricia; Kasnakian, Caroline

    2011-01-01

    Objective: To implement a pilot quality improvement project for depression identification and treatment in college health. Participants: Eight college health center teams composed primarily of primary care and counseling service directors and clinicians. Methods: Chronic (Collaborative) Care Model (CCM) used with standardized screening to…

  9. Samba for solar modules. Brazil decides reimbursement strategy and starts pilot projects; Samba fuer Solarmodule. Brasilien macht den Weg fuer die Einspeisung von Solarstrom frei und startet Pilotprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Rosell, Alejandro Diego

    2012-06-15

    Better late than never: After long years of discussion, Brazil recently decided on a reimbursement strategy. Further, pilot projects with a total of 24 MW are in te planning stage. While some expect a major invitation for tender, local experts warn of rough times ahead.

  10. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    Energy Technology Data Exchange (ETDEWEB)

    Powers, D.W. [Powers (Dennis W.), Anthony, TX (United States); Martin, M.L. [International Technology, Inc., Las Vegas, NV (United States)

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries.

  11. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    International Nuclear Information System (INIS)

    Powers, D.W.; Martin, M.L.

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries

  12. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  13. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  14. Manpower Projections, Recruitment Needs and Training Requirements for Commercial Airline Pilots in the United States 1968-1979.

    Science.gov (United States)

    Simons, Robert Marchand

    This study evaluated the reported airline pilot shortage in relation to certified air carriers; recruitment needs for qualified applicants; training requirements as recommended by air carriers, airline captains, and flight officers; and airline pilot supply and demand during 1968-79. A literature review on foreign and domestic pilot shortages was…

  15. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  16. Improving education and supervision of Queensland X-ray Operators through video conference technology: A teleradiography pilot project.

    Science.gov (United States)

    Rawle, Marnie; Oliver, Tanya; Pighills, Alison; Lindsay, Daniel

    2017-12-01

    X-ray Operator (XO) supervision in Queensland is performed by radiographers in a site removed from the XO site. This has historically been performed by telephone when the XO requires immediate help, as well as post-examination through radiographer review and the provision of written feedback on images produced. This project aimed to improve image quality through the provision of real-time support of XOs by the introduction of video conference (VC) supervision. A 6-month pilot project compared image quality with and without VC supervision. VC equipment was installed in the X-ray room at two rural sites, as well as at the radiographer site, to enable visual and oral supervision. The VC unit enabled visualisation of the X-ray examination technique as it was being undertaken, as well as the images produced prior to transmission to the Picture Archiving and Communication System (PACS). Statistically significant improvement in image quality criteria measures were seen for patient positioning (P = 0.008), image quality (P < 0.001) and diagnostic value (P < 0.001) of images taken during this project. No statistically significant differences were seen during case level assessment in the inclusion of only appropriate imaging (P = 0.06), and the inclusion of unacceptable imaging (P = 0.06), however improvements were seen in both of these criteria. The survey revealed 24.6% of examinations performed would normally have involved the XO contacting the radiographer for assistance, although, assistance was actually provided in 88.3% of examinations. This project has demonstrated that significant improvement in image quality is achievable with VC supervision. A larger study with a control arm that did not receive direct supervision should be used to validate the findings of this study. © 2017 The Authors. Journal of Medical Radiation Sciences published by John Wiley & Sons Australia, Ltd on behalf of Australian Society of Medical Imaging and Radiation Therapy and New Zealand

  17. Participatory testing and reporting in an environmental-justice community of Worcester, Massachusetts: a pilot project

    Directory of Open Access Journals (Sweden)

    Calvache Maria-Camila

    2010-07-01

    Full Text Available Abstract Background Despite indoor home environments being where people spend most time, involving residents in testing those environments has been very limited, especially in marginalized communities. We piloted participatory testing and reporting that combined relatively simple tests with actionable reporting to empower residents in Main South/Piedmont neighborhoods of Worcester, Massachusetts. We answered: 1 How do we design and implement the approach for neighborhood and household environments using participatory methods? 2 What do pilot tests reveal? 3 How does our experience inform testing practice? Methods The approach was designed and implemented with community partners using community-based participatory research. Residents and researchers tested fourteen homes for: lead in dust indoors, soil outdoors, paint indoors and drinking water; radon in basement air; PM2.5 in indoor air; mold spores in indoor/outdoor air; and drinking water quality. Monitoring of neighborhood particulates by residents and researchers used real-time data to stimulate dialogue. Results Given the newness of our partnership and unforeseen conflicts, we achieved moderate-high success overall based on process and outcome criteria: methods, test results, reporting, lessons learned. The conflict burden we experienced may be attributable less to generic university-community differences in interests/culture, and more to territoriality and interpersonal issues. Lead-in-paint touch-swab results were poor proxies for lead-in-dust. Of eight units tested in summer, three had very high lead-in-dust (>1000 μg/ft2, six exceeded at least one USEPA standard for lead-in-dust and/or soil. Tap water tests showed no significant exposures. Monitoring of neighborhood particulates raised awareness of environmental health risks, especially asthma. Conclusions Timely reporting back home-toxics' results to residents is ethical but it must be empowering. Future work should fund the active

  18. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  19. One-year effects of Project EX: A smoking intervention pilot program with Spanish adolescents.

    Science.gov (United States)

    Espada, José P; Gonzálvez, María T; Orgilés, Mireia; Sussman, Steve

    2017-07-01

    Adolescent smoking is a major public health problem, which has led to the development of cessation programs such as Project EX. However, there is no evidence for the long-term efficacy of cessation among Spanish adolescents. This study provides a 1-year follow-up evaluation of the Project EX tobacco use cessation program among 211 smokers. The intent-to-treat 30-day smoking quit rate for the program group was 7.81 percent ( p = .04), whereas no smokers quit in the control group ( p = .02). The intervention had a significant influence on future smoking expectation, intention, motivation to quit, and overall level of 30-day smoking. Long-term outcomes of the Project EX clinic-based program are promising for adolescent smokers in Spain.

  20. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  1. Providing Home-Based HIV Testing and Counseling for Transgender Youth (Project Moxie): Protocol for a Pilot Randomized Controlled Trial.

    Science.gov (United States)

    Stephenson, Rob; Metheny, Nicholas; Sharma, Akshay; Sullivan, Stephen; Riley, Erin

    2017-11-28

    Transgender and gender nonconforming people experience some of the highest human immunodeficiency virus (HIV) rates in the United States, and experience many structural and behavioral barriers that may limit their engagement in HIV testing, prevention, and care. Evidence suggests that transgender and gender nonconforming youth (TY) are especially vulnerable to acquiring HIV, yet there is little research on TY and few services are targeted towards HIV testing, prevention, and care for this population. Telehealth presents an opportunity to mitigate some structural barriers that TY experience in accessing HIV testing, allowing TY to engage in HIV testing and counseling in a safe and nonjudgmental space of their choosing. Project Moxie is an HIV prevention intervention that pairs the use of HIV self-testing with remote video-based counseling and support from a trained, gender-affirming counselor. This study aims to offer a more positive HIV testing and counseling experience, with the goal of improving HIV testing frequency. Project Moxie involves a pilot randomized controlled trial (RCT) of 200 TY aged 15-24 years, who are randomized on a 1:1 basis to control or intervention arms. The aim is to examine whether the addition of counseling provided via telehealth, coupled with home-based HIV testing, can create gains in routine HIV testing among TY over a six-month follow-up period. This study implements a prospective pilot RCT of 200 TY recruited online. Participants in the control arm will receive one HIV self-testing kit and will be asked to report their results via the study's website. Participants in the experimental arm will receive one HIV self-testing kit and will test with a remotely-located counselor during a prescheduled video-counseling session. Participants are assessed at baseline, and at three and six months posttesting. Project Moxie was launched in June 2017 and recruitment is ongoing. As of August 21, 2017, the study had enrolled 130 eligible

  2. Translation of SNOMED CT - strategies and description of a pilot project.

    Science.gov (United States)

    Klein, Gunnar O; Chen, Rong

    2009-01-01

    The translation and localization of SNOMED CT (Systematized Nomenclature of Medicine - Clinical Terms) have been initiated in a few countries. In Sweden, we conducted the first evaluation of this terminology in a project called REFTERM in which we also developed a software tool which could handle a large scale translation with a number of translators and reviewers in a web-based environment. The system makes use of existing authorized English-Swedish translations of medical terminologies such as ICD-10. The paper discusses possible strategies for a national project to translate and adapt this terminology.

  3. Retrospective evaluation of Project Envision: A community mobilization pilot program to prevent sexual violence in New York City.

    Science.gov (United States)

    Glenn, Lily; Fidler, Laura; O'Connor, Meghan; Haviland, Mary; Fry, Deborah; Pollak, Tamara; Frye, Victoria

    2018-02-01

    Sexual violence is a public health problem associated with short- and long-term physical and mental health consequences. Most interventions that aim to prevent sexual violence before it occurs target individual-level change or promote bystander training. Community-level interventions, while increasingly recommended in the sexual violence prevention field, are rarely documented in peer-reviewed literature. This paper is a targeted process evaluation of Project Envision, a 6-year pilot initiative to address social norms at the root of sexual violence through coalition building and community mobilization in three New York City neighborhoods, and reflects the perspectives of those charged with designing and implementing the program. Evaluation methods included a systematic literature review, archival source document review, and key informant interviews. Three themes emerged from the results: community identity and implications for engagement; capacity and readiness for community mobilization and consequences for implementation; and impacts on participants. Lessons learned include the limitations of using geographic boundaries to structure community interventions in urban settings; carefully considering whether communities should be mobilized around an externally-identified issue; translating theoretical frameworks into concrete tasks; assessing all coalition partners and organizations for readiness; critically evaluating available resources; and recognizing that community organizing is a skill that requires investment from funders. We conclude that Project Envision showed promise for shifting institutional norms towards addressing root causes of sexual violence in addition to providing victim services. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Pilot project on low-energy ventilation in relation to agriculture. Explanation; Forprojekt om lavenergiventilation i landbruget. Udredning

    Energy Technology Data Exchange (ETDEWEB)

    Guul-Simonsen, F.; Kierkegaard, P.; Pedersen, J.K.; Stroem, J.; Widell, K.E.

    1995-07-01

    The pilot project documents the current status of ventilation in animal shelters such as barns, cowsheds etc. with emphasis on the various ventilation systems and a definition of the problems and possible aims regarding energy savings. The decision as to whether to continue the project will be based on this information. This type of ventilation differs from that used in residential and industrial buildings in that larger volumes of air are moved and greater amounts of heat, humidity and gases are produced by the animals. The most significant improvements have so far been achieved by changing aerodynamic conditions and by control of the number of rotations within ventilation systems. Motors used today are mainly single-phased, with 100-400 W capacity and an efficiency of 50-55%. Suggestions for improving energy efficiency by 15% are given. An improved aerodynamic design in connection with air extraction could achieve a 35% optimization. In addition the climate within the buildings would be considerably improved. It may take some time, it is suggested, for Danish manufacturers of ventilation systems to further develop their products, unless they work together towards this aim. (AB) 46 refs.

  5. The in-depth safety assessment (ISA) pilot projects in Ukraine

    International Nuclear Information System (INIS)

    Kot, C. A.

    1998-01-01

    Ukraine operates pressurized water reactors of the Soviet-designed type, VVER. All Ukrainian plants are currently operating with annually renewable permits until they update their safety analysis reports (SARs). After approval of the SARS by the Ukrainian Nuclear Regulatory Authority, the plants will be granted longer-term operating licenses. In September 1995, the Nuclear Regulatory Authority and the Government Nuclear Power Coordinating Committee of Ukraine issued a new contents requirement for the safety analysis reports of VVERs in Ukraine. It contains requirements in three major areas: design basis accident (DBA) analysis, probabilistic risk assessment (PRA), and beyond design-basis accident (BDBA) analysis. The DBA requirements are an expanded version of the older SAR requirements. The last two requirements, on PRA and BDBA, are new. The US Department of Energy (USDOE), through the International Nuclear Safety Program (INSP), has initiated an assistance and technology transfer program to Ukraine to assist their nuclear power stations in developing a Western-type technical basis for the new SARS. USDOE sponsored In-Depth Safety Assessments (ISAs) have been initiated at three pilot nuclear reactor units in Ukraine, South Ukraine Unit 1, Zaporizhzhya Unit 5, and Rivne Unit 1. USDOE/INSP have structured the ISA program in such a way as to provide maximum assistance and technology transfer to Ukraine while encouraging and supporting the Ukrainian plants to take the responsibility and initiative and to perform the required assessments

  6. "i h8 u": The Influence of Normative Beliefs and Hostile Response Selection in Predicting Adolescents' Mobile Phone Aggression--A Pilot Study

    Science.gov (United States)

    Nicol, Annemarie; Fleming, Michele J.

    2010-01-01

    Mobile phone aggression (MPA) is a relatively new phenomenon. Using newly developed measures, a pilot study was conducted with 348 adolescents ages 13-17 years to determine the incidence of MPA and victimization in this group of adolescents and to test a proposed model in which hostile response selection mediated the relationship between normative…

  7. EcoPrinciples Connect: A Pilot Project Matching Ecological Principles with Available Data to Promote Ecosystem-Based Management

    Science.gov (United States)

    Martone, R. G.; Erickson, A.; Mach, M.; Hale, T.; McGregor, A.; Prahler, E. E.; Foley, M.; Caldwell, M.; Hartge, E. H.

    2016-12-01

    Ocean and coastal practitioners work within existing financial constraints, jurisdictions, and legislative authorities to manage coastal and marine resources while seeking to promote and maintain a healthy and productive coastal economy. Fulfilling this mandate necessitates incorporation of best available science, including ecosystem-based management (EBM) into coastal and ocean management decisions. To do this, many agencies seek ways to apply lessons from ecological theory into their decision processes. However, making direct connections between science and management can be challenging, in part because there is no process for linking ecological principles (e.g., maintaining species diversity, habitat diversity, connectivity and populations of key species) with available data. Here we explore how incorporating emerging data and methods into resource management at a local scale can improve the overall health of our coastal and marine ecosystems. We introduce a new web-based interface, EcoPrinciples Connect, that links marine managers to scientific and geospatial information through the lens of these ecological principles, ultimately helping managers become more efficient, more consistent, and advance the integration of EBM. The EcoPrinciples Connect tool grew directly out of needs identified in response to a Center for Ocean Solutions reference guide, Incorporating Ecological Principles into California Ocean and Coastal Management: Examples from Practice. Here we illustrate how we have worked to translate the information in this guide into a co-developed, user-centric tool for agency staff. Specifically, we present a pilot project where we match publicly available data to the ecological principles for the California San Francisco Bay Conservation and Development Commission. We will share early lessons learned from pilot development and highlight opportunities for future transferability to an expanded group of practitioners.

  8. Teaching Basic Programming Concepts to Young Primary School Students Using Tablets: Results of a Pilot Project

    Science.gov (United States)

    Fokides, Emmanuel

    2018-01-01

    The study presents the results of a project in which tablets and a ready-made application were used for teaching basic programming concepts to young primary school students (ages 7-9). A total of 135 students participated in the study, attending primary schools in Athens, Greece, divided into three groups. The first was taught conventionally. The…

  9. Understanding of Danish Passive Houses based on Pilot Project the Comfort Houses

    DEFF Research Database (Denmark)

    Brunsgaard, Camilla

    2010-01-01

    The building industry in Denmark and the rest of Europe is facing challenges in fulfilling the EU directive of 2002. New buildings and renovation projects need to improve the energy performance to be able to fulfil the Kyoto agreement from 1998 (Directive 2002). In Denmark it has resulted in new ...

  10. Smart energy households' pilot projects in the Netherlands with a design-driven approach

    NARCIS (Netherlands)

    Geelen, D.V.; Scheepens, A.; Kobus, C.; Obinna, U.; Mugge, R.; Schoormans, J.; Reinders, Angelina H.M.E.

    2013-01-01

    Residential smart grid projects can be evaluated by a design-driven approach, which focuses on gaining insights for successful product and service development by taking the end-users as a starting point. Because only little experience exists with this design-driven approach, this paper addresses how

  11. Promoting Information Literacy of Pre-Medical Students through Project-Based Learning: A Pilot Study

    Science.gov (United States)

    Saliba, Reya; Mussleman, Paul; Fernandes, Melanie; Bendriss, Rachid

    2017-01-01

    This study describes the implementation of information literacy (IL) skills through the use of the project-based learning (PjBL) method in an English for Academic Purposes (EAP) course. Participants were Arabic speaking students enrolled in the Foundation Program that prepared them for the pre-medical curriculum in a U.S. medical college in the…

  12. Electronic Mentoring of LIS Research Utilizing BITNET: An ACRL Pilot Project.

    Science.gov (United States)

    Gregory, Vicki L.

    1992-01-01

    Describes an ACRL (American College and Research Libraries) project that utilized the electronic conferencing facility of BITNET to provide a system of mentoring for academic librarians conducting research. Results of an electronic mail survey of participants that examined experience levels, attitudes, problems, and communication patterns are…

  13. Project of neural network for steel grade selection with the assumed CCT diagram

    OpenAIRE

    S. Malara; L.A. Dobrzański; J. Trzaska

    2008-01-01

    Purpose: The aim of this paper was developing a project of neural network for selection of steel grade with the specified CCT diagram – structure and of harness after heat treatment.Design/methodology/approach: The goal has been achieved in the following stages: at the first stage characteristic points of CCT diagram have been determined. At the second stage neural network has been developed and optimized.Findings: The neural network was developed in this paper, that allowed selection of stee...

  14. International programme on the health effects of the Chernobyl accidents (IPHECA). Protocol for the pilot project ''Thyroid''

    International Nuclear Information System (INIS)

    1994-01-01

    The protocol document for the Thyroid Project of International Programme on the Health Effects of the Chernobyl Accidents (IPHECA) describes the main aims of the project, namely 1) to detect and describe selected diseases of the thyroid among children and adolescents in population centres assigned earlier as ''strictly controlled zones'' and, 2) to determine, if possible, the link between the prevalence of the diseases and radiation doses received by the thyroid. Population to be investigated, medical and laboratory examinations and advanced diagnostics for thyroid diseases to be undertaken are enlisted in the protocol

  15. Experiences from a pilot study on how to conduct a qualitative multi-country research project regarding use of antibiotics in Southeast Europe

    DEFF Research Database (Denmark)

    Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall

    2016-01-01

    regarding how to conduct these types of research projects by evaluating a pilot study of the project. METHODS: Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused......BACKGROUND: In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations......) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge...

  16. Audit of selected aspects of the Waste Isolation Pilot Plant cost structure, Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    1994-01-01

    The Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, is a research and development facility intended to demonstrate that transuranic waste from the Government's defense activities can be safely disposed of in a deep geologic formation. The Fiscal Year 1994 budget for WIPP is about $185 million and includes funding for the operation of WIPP and for experiments being done by other DOE facilities. DOE's current plan is for WIPP to begin receiving transuranic waste in June 1998. This audit was requested by the Assistant Secretary for Environmental Management because two recent reports, one issues by the Office of Inspector General (OIG), were critical of the staffing and cost-effectiveness of WIPP, and because of recent mission changes at WIPP. The audit team consisted of representatives from the DOE, auditors from the OIG, and technical specialists hired by the OIG to assist in the audit. The purpose of the audit was to determine whether WIPP was appropriately staffed to meet programmatic requirements in the most cost-effective manner. The Secretary of Energy expected DOE facilities to benchmark their performance against other facilities to strive for best in class status, and the Westinghouse management and operating contract for WIPP required the facility to be operated in a cost-effective manner. However, the authors determined that Westinghouse did not use benchmarks and that WIPP could be managed more cost-effectively, with fewer personnel, while maintaining its current level of excellence. They concluded that the WIPP staffing level could be significantly reduced with a decrease in costs at WIPP of about $11.4 million per year

  17. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  18. Child Maltreatment Surveillance Improvement Opportunities: A Wake County, North Carolina Pilot Project.

    Science.gov (United States)

    Shanahan, Meghan E; Fliss, Mike D; Proescholdbell, Scott K

    2018-01-01

    BACKGROUND As child maltreatment often occurs in private, child welfare numbers underestimate its true prevalence. Child maltreatment surveillance systems have been used to ascertain more accurate counts of children who experience maltreatment. This manuscript describes the results from a pilot child maltreatment surveillance system in Wake County, North Carolina. METHODS We linked 2010 and 2011 data from 3 sources (Child Protective Services, Raleigh Police Department, and Office of the Chief Medical Examiner) to obtain rates of definite and possible child maltreatment. We separately analyzed emergency department visits from 2010 and 2011 to obtain counts of definite and possible child maltreatment. We then compared the results from the surveillance systems to those obtained from Child Protective Services (CPS) data alone. RESULTS In 2010 and 2011, rates of definite child maltreatment were 11.7 and 11.3 per 1,000 children, respectively, when using the linked data, compared to 10.0 and 9.5 per 1,000 children using CPS data alone. The rates of possible maltreatment were 25.3 and 23.8 per 1,000, respectively. In the 2010 and 2011 emergency department data, there were 68 visits and 84 visits, respectively, that met the case definition for maltreatment. LIMITATIONS While 4 data sources were analyzed, only 3 were linked in the current surveillance system. It is likely that we would have identified more cases of maltreatment had more sources been included. CONCLUSION While the surveillance system identified more children who met the case definition of maltreatment than CPS data alone, the rates of definite child maltreatment were not considerably higher than official reports. Rates of possible child maltreatment were much higher than both the definite case definition and child welfare records. Tracking both definite and possible case definitions and using a variety of data sources provides a more complete picture of child maltreatment in North Carolina. ©2018 by the

  19. Site selection and evaluation studies of the Waste Isolation Pilot Plant (WIPP), Los Medanos, Eddy County, NM

    International Nuclear Information System (INIS)

    Griswold, G.B.

    1977-12-01

    Bedded-salt deposits of the Salado Formation have been selected for evaluation for a proposed Waste Isolation Pilot Plant (WIPP) to be located in Eddy County, NM, approximately 26 mi east of Carlsbad. Site selection and evaluation studies that included geologic mapping, geophysical surveys, drilling, and resource appraisal were conducted over and under the prospective location. The lower portion of the Salado meets essential criteria for waste isolation. Beds chosen for waste storage lie 2074 to 2730 ft below the surface. High-purity salt exists at these depths, and the geologic structure revealed by geophysical surveys indicates that these beds are essentially flat. Additional geophysical surveys are now under way. The initial interpretation of the new data indicates that more structure may exist in the salt beds in the northern portion of the site area. Full evaluation of potentially commercial deposits of potash and natural gas within the WIPP site will be reported by separate studies, as will be the hydrologic details of the region

  20. The URban Greenhouse gas Emissions assessment through inverse modeling (URGE) project: a pilot study in the Oslo area

    Science.gov (United States)

    Pisso, I. J.; Lopez-Aparicio, S.; Schneider, P.; Schmidbauer, N.; Vogt, M.

    2017-12-01

    Norway has set the target of cutting greenhouse gas (GHG) emissions by at least 40% compared to 1990 levels by 2030. This goal will require the implementation of policy measures aiming at strong reductions of GHGs emissions, especially in the urban environment. The implementation of urban policy measures is still a challenging task and it requires control and verification for success. The URGE project aims at assessing the emission flux of GHGs including comprehensive uncertainty estimates based on inverse transport modelling techniques and optimized use of measurements. The final goal is to establish a coherent and consistent GHG urban emission inventory. This will be carried out in a case study in Oslo (Norway), where CO2 will be the priority compound. The overall outcome of the project will provide support in the development of strategies to effectively reduce GHG emissions in the urban environment. The overall goal will be reached through establishing the baseline urban CO2 emission inventory for Oslo; determining the optimal measurement locations based on transport modelling (with flexpart-wrf); designing and carrying out a pilot measurement campaign of the CO2-rich air downwind of the city plume combining state-of-the-art instruments (Picarro) and small sensors; assessing the feasibility of determining the background concentration surrounding the city with satellite measurements (OCO2); and providing optimised estimates of the emissions and their uncertainties via inverse modelling (source-receptor relationship). One of our main interests is the interoperability and exchange of information with similar activities in other urban areas. We will present the overall project and the preliminary results of the network design. We will discuss the data exchange formats, the algorithms and data structures that could be used for results and methodology intercomparisons as well as the suitability to apply the same techniques to other atmospheric compounds.